SUBCHAPTER I ANCHORAGES
PART 109 GENERAL
Authority: 33 U.S.C. 471; 46 U.S.C. 70034; Public Law 107-296, 116 Stat. 2135; Department of Homeland Security Delegation No. 0170.1.
§ 109.01 Purpose.
The purpose of the rules and regulations in this subchapter is to implement certain laws and set forth the requirements for anchorage areas.
[CGFR 67-46, 32 FR 17727, Dec. 12, 1967, as amended by CGD 79-096, 44 FR 51585, Sept. 4, 1979; USCG-1998-3799, 63 FR 35526, June 30, 1998]
§ 109.05 Anchorage grounds.
(a) Section 7 of the Rivers and Harbors Act of March 4, 1915 (33 U.S.C. 471), authorizes the establishment of anchorage grounds for vessels in navigable waters of the United States whenever it is apparent that these are required by the maritime or commercial interests of the United States for safe navigation. The statute also authorizes the adoption of suitable rules and regulations regarding the establishment of anchorage grounds, which are enforced by the Coast Guard. The authority conferred by this statute was transferred to and vested in the Secretary of Homeland Security by section 902(j) of the Coast Guard and Maritime Transportation Act of 2006 (Pub. L. 109-241, 120 Stat. 516), and delegated to the Commandant of the U.S. Coast Guard in Department of Homeland Security Delegation No. 0170.1. The Commandant redelegated the authority to establish anchorage grounds to each Coast Guard District Commander as provided in 33 CFR 1.05-1(e)(1)(i).
(b) District Commanders will, whenever matters relating to the anchorage of vessels are under consideration, ascertain the view of the District and Division Engineer, Corps of Engineers, U.S. Army, and the proper representatives of other departments likely to be interested, including the Commandant of the Naval District concerned and the medical officer in charge of the quarantine station at localities where quarantine anchorages are involved, in order that they may arrange for suitable representation at such hearings. The views of the medical officer in charge of the quarantine station relating to the proposed location and boundaries of the quarantine anchorage will be accepted insofar as practicable and consistent with the establishment of other anchorage areas. (An Act of Congress approved July 1, 1944, as amended (42 U.S.C. 267), authorizes the Surgeon General, with the approval of the Secretary of Health, Education, and Welfare, to designate the boundaries of the quarantine grounds and quarantine anchorages for vessels which are reserved for use at each United States quarantine station.) A notice of public hearing concerning changes to the Anchorage Regulations will be issued by the District Commander and will be mailed to all known interested parties. After providing an opportunity for public participation, the District Commander will, if circumstances so warrant, issue changes to the Anchorage Regulations, or in appropriate cases forward recommendations for such changes to the Commandant.
(c) As soon as publication has been noted in the Federal Register, the District Commander will publish changes to the Anchorage Regulations in the Local Notice to Mariners.
(33 U.S.C. 471, 180, 258, 322, and 499; 49 CFR 1.46(c) and 1.45(b))
[CGFR 67-46, 32 FR 17727, Dec. 12, 1967, as amended by CGD 79-096, 44 FR 51585, Sept. 4, 1979; USCG-1998-3799, 63 FR 35526, June 30, 1998; USCG-2007-27887, 72 FR 45902, Aug. 16, 2007]
§ 109.07 Anchorages under Ports and Waterways Safety Act.
The provisions of section 4 (a) and (b) of the Ports and Waterways Safety Act as delegated to the Commandant of the U.S. Coast Guard in Pub. L. 107-296, 116 Stat. 2135, authorize the Commandant to specify times of movement within ports and harbors, restrict vessel operations in hazardous areas and under hazardous conditions, and direct the anchoring of vessels. The sections listed in § 110.1a of this subchapter are regulated under the Ports and Waterways Safety Act.
[CGD 3-81-1A, 47 FR 4063, Jan. 28, 1982, as amended by USCG-2003-14505, 68 FR 9535, Feb. 28, 2003]
§ 109.10 Special anchorage areas.
An Act of Congress of April 22, 1940, provides for the designation of special anchorage areas wherein vessels not more than sixty-five feet in length, when at anchor, will not be required to carry or exhibit anchorage lights. Such designation is to be made after investigation, by rule, regulation, or order, the procedure for which will be similar to that followed for anchorage grounds under section 7 of the Rivers and Harbors Act of March 4, 1915, as referred to in § 109.05. The areas so designated should be well removed from the fairways and located where general navigation will not endanger or be endangered by unlighted vessels. The authority to designate special anchorage areas was transferred to and vested in the Secretary of Homeland Security by section 902(j) of the Coast Guard and Maritime Transportation Act of 2006 (Pub. L. 109-241, 120 Stat 516), and delegated to the Commandant of the U.S. Coast Guard in Department of Homeland Security Delegation No. 0170.1. The Commandant redelegated the authority to establish anchorage grounds to each Coast Guard District Commander as provided in 33 CFR 1.05-1(e)(1)(i).
[USCG-2007-27887, 72 FR 45902, Aug. 16, 2007]
§ 109.15 Enforcement proceedings.
Proceedings against a vessel violating the Anchorage Regulations are to be brought in the name of the officer of the Coast Guard assigned for the time being as Captain of the Port. When the vessel is at a port where there is no Coast Guard officer, proceedings will be initiated in the name of the District Commander.
[CGFR 67-46, 32 FR 17727, Dec. 12, 1967, as amended by USCG-2007-27887, 72 FR 45903, Aug. 16, 2007]
§ 109.20 Publication; notice of proposed rule making.
(a) Section 4 of the Administrative Procedure Act (5 U.S.C. 553), requires publication of general notice of proposed rule making in the Federal Register (unless all persons subject thereto are named and either personally served or otherwise have actual notice thereof in accordance with law), except to the extent that there is involved (1) any military, naval, or foreign affairs function of the United States or (2) any matter relating to agency management or personnel or to public property, loans, grants, benefits, or contracts. Except where notice or hearing is required by statute, this requirement does not apply to interpretative rules, general statements of policy, rules of agency organization, procedure, or practice, or in any situation in which the agency for good cause finds (and incorporates the finding and a brief statement of the reasons therefor in the rules issued) that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest.
(b) General notice of proposed rule making published in accordance with the above will include (1) a statement of the time, place, and nature of public rule making proceedings; (2) reference to the authority under which the rule is proposed; and (3) either the terms or substance of the proposed rule or a description of the subjects and issues involved.
[CGFR 67-46, 32 FR 17727, Dec. 12, 1967]
PART 110 ANCHORAGE REGULATIONS
Authority: 33 U.S.C. 2071; 46 U.S.C. 70006, 70034; 33 CFR 1.05-1; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.4.
Source: CGFR 67-46, 32 FR 17728, Dec. 12, 1967, unless otherwise noted.
Editorial Note: Nomenclature changes to part 110 appear by USCG-2025-0186, 90 FR 12238, Mar. 17, 2025, and by USCG-2025-0716, 90 FR 47585-47586, Oct. 2, 2025.
§ 110.1 General.
(a) The areas described in subpart A of this part are designated as special anchorage areas for the purposes of rule 30 (33 CFR 83.30) and rule 35 (33 CFR 83.35) of the Inland Navigation Rules, 33 CFR Chapter I, Subchapter E. Vessels of less than 20 meters in length; and barges, canal boats, scows, or other nondescript craft, are not required to sound signals required by rule 35 of the Inland Navigation Rules. Vessels of less than 20 meters are not required to exhibit anchor lights or shapes required by rule 30 of the Inland Navigation Rules.
(b) The anchorage grounds for vessels described in subpart B of this part are established, and the rules and regulations in relation thereto adopted, pursuant to the authority contained in section 7 of the act of March 4, 1915, as amended (38 Stat. 1053; 33 U.S.C. 471).
(c) All bearings in the part are referred to true meridian.
(d) Geographic coordinates expressed in terms of latitude or longitude, or both, are not intended for plotting on maps or charts whose reference horizontal datum is the North American Datum of 1983 (NAD 83), unless such geographic coordinates are expressly labeled NAD 83. Geographic coordinates without the NAD 83 reference may be plotted on maps or charts referenced to NAD 83 only after application of the appropriate corrections that are published on the particular map or chart being used.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD 86-082, 52 FR 33811, Sept. 8, 1987; USCG-1998-3799, 63 FR 35526, June 30, 1998; USCG-2014-0410, 79 FR 38432, July 7, 2014]
§ 110.1a Anchorages under Ports and Waterways Safety provisions.
(a) The anchorages listed in this section are regulated under 46 U.S.C. Chapter 700, “Ports and Waterways Safety”:
(1) Section 110.155 Port of New York.
(2) [Reserved]
(b) [Reserved]
[CGD 3-81-1A, 47 FR 4063, Jan. 28, 1982, as amended by CGD 96-052, 62 FR 16703, Apr. 8, 1997; USCG-2018-1049, 84 FR 7813, Mar. 5, 2019]
§ 110.3 USCG Northeast District Special Anchorage Areas.
Regulations designating special anchorage areas in the USCG Northeast District appear in §§ 110.4 through 110.60.
Note 1 to § 110.3:
Those planning to use these special anchorage areas are advised that state ordinances, local ordinances, or both, may apply. The local harbormaster is often the best source of information about any such ordinances.
[USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
Subpart A Special Anchorage Areas
§ 110.4 Penobscot Bay, Maine.
(a) Rockland Harbor. Beginning at a point bearing 244°, 1,715 yards, from Rockland Breakwater Light; thence 260°, 490 yards, to a point bearing 248° from Rockland Breakwater Light; thence 350°, 580 yards, to a point bearing 263° from Rockland Breakwater Light; thence 83°, 480 yards, to a point bearing 263° from Rockland Breakwater Light; and thence 169°, 550 yards, to the point of beginning. This area is limited to vessels no greater than 20 meters in length.
(b) Camden Harbor, Sherman Cove and adjacent waters—(1) Anchorage A. All of the waters enclosed by a line beginning at Eaton Point at latitude 44°12′31″ N, longitude 069°03′34″ W; thence to latitude 44°12′28″ N, longitude 069°03′33″ W; thence to latitude 44°12′32″ N, longitude 069°02′49″ W; thence along the shoreline to the point of beginning. DATUM: NAD83
(2) Anchorage B. All of the waters enclosed by a line beginning at Dillingham Point at latitude 44°12′12″ N, longitude 069°03′20″ W.; thence to latitude 44°12′14″ N, longitude 069°02′58″ W.; thence to latitude 44°12′19″ N, longitude 069°03′08″ W; thence to latitude 44°12′28″ N, longitude 069°03′13″ W; thence to latitude 44°12′26″ N, longitude 069°03′39″ W; thence along the shoreline to the point of beginning. DATUM: NAD83
(c) Stonington Harbor, Deer Island Thorofare—(1) Crotch Island. All of the waters bound by the following points beginning at the northeast shore of Crotch Island located at: latitude 44°08′51.0″ N, longitude 068°40′06.0″ W; thence southerly along the shoreline to latitude 44°08′36.0″ N, longitude 068°40′07.02″ W; thence to latitude 44°08′36.0″ N, longitude 068°40′04.02″ W; thence to latitude 44°08′46.98″ N, longitude 068°40′00.0″ W; thence to latitude 44°08′55.02″ N, longitude 068°39′49.02″ W; thence to latitude 44°08′54.0″ N, longitude 068°40′06.0″ W thence back to origin.
DATUM: NAD 83.
(2) [Reserved]
(d) Passagassawakeag River, Belfast Bay, Belfast, Maine—(1) Special anchorage area A. All of the waters enclosed by a line beginning at latitude 44°25′47.2458″ N, longitude 069°00′7.5943″ W; thence to latitude 44°25′48″ N, longitude 068°59′57″ W; thence to latitude 44°25′39″ N, longitude 068°59′17″ W; thence to latitude 44°25′33″ N, longitude 068°59′15″ W; thence to latitude 44°25′30″ N, longitude 068°58′48″ W; thence to latitude 44°25′23.9162″ N, longitude 068°58′54.0838″ W; thence to latitude 44°25′42.7050″ N, longitude 068°59′55.2686″ W thence to the point of beginning.
(2) Special anchorage area B. All of the waters enclosed by a line beginning at latitude 44°25′45.3309″ N, longitude 069°00′09.0265″ W; thence to latitude 44°25′41.1720″ N, longitude 068°59′58.2017″ W; thence to latitude 44°25′27.7645″ N, longitude 068°59′23.3130″ W; thence to latitude 44°25′18.2707″ N, longitude 068° 58′58.6083″ W; thence to latitude 44°24′56″ N, longitude 068°59′23″ W; thence to latitude 44°25′ 21.0416″ N, longitude 068°59′37.5019″ W; thence to latitude 44°25′35.5413″ N, longitude 068°59′58.1933″ W; thence to the point of beginning.
[CGD01-02-129, 68 FR 44888, July 31, 2003, as amended by CGD01-06-084, 72 FR 466, Jan. 5, 2007; USCG-2007-0198, 73 FR 38923, July 8, 2008; USCG-2016-0989, 84 FR 32271, July 8, 2019; 85 FR 21774, Apr. 20, 2020; 85 FR 50784, Aug. 18, 2020; USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.5 Casco Bay, Maine.
(a) Beals Cove, West side of Orrs Island, Harpswell. The entire cove as defined by the shoreline and a line across the entrace bearing 215° and tangent to the shore on the north side.
(a-1) Merriconeag Sound, Harpswell. The area comprises that portion of the Sound beginning at a point on the shoreline about 1,000 feet northeasterly from the southwesterly extremity of Orrs Island at latitude 43°45′09″, longitude 69°59′14″, thence extending 290° to a point at latitude 43°45′10″, longitude 69°59′20″, thence extending 20° to a point at latitude 43°45′34″, longitude 69°59′05″, thence extending 110° to a point on the shoreline at latitude 43°45′33″, longitude 69°58′58″, thence along the shoreline to the point of beginning.
(a-2) Mackerel Cove, Bailey Island, Harpswell. The water area of Mackerel Cove lying northeasterly of a line from a point on Abner Point at latitude 43°43′28″ N., longitude 70°00′19″ W., to a point on Bailey Island at latitude 43°43′18.2″ N., longitude 70°00′12.2″ W.
(b) Harpswell Harbor, east side of Harpswell Neck, Harpswell. The entire area lying westerly of a line bearing 8° from the eastern extremity of Stovers Point to the point of land at the northerly end of the harbor, said point of land bearing approximately 275° from the observatory on Orrs Island.
(c) Basin Cove, west side of Harpswell Neck, Harpswell. All of the area lying northeasterly of a line bearing 350° from the northwest corner of the entrance to the cove.
(c-1) Basin Point, Potts Harbor, east side of Basin Point. The water area east of Basin Point enclosed by a line beginning at the southernmost extremity of Basin Point at latitude 43°44′17″ N., longitude 70°02′36″ W.; thence easterly to latitude 43°44′17″ N., longitude 70°02′19″ W.; thence north northeasterly to a point on the shoreline at latitude 43°44′43″ N., longitude 70°02′05″ W.; thence following the shoreline to the point of beginning.
(d) Mussel Cove and adjacent waters at Falmouth Foreside, Falmouth. All of the waters enclosed by a line beginning at the Dock House (F.S.) located at latitude 43°44′22″ N, longitude 70°11′41″ W; thence to latitude 43°44′19″ N, longitude 70°11′33″ W; thence to latitude 43°44′00″ N, longitude 70°11′44″ W; thence to latitude 43°43′37″ N, longitude 70°11′37″ W; thence to latitude 43°43′04″ N, longitude 70°12′13″ W; thence to latitude 43°41′56″ N, longitude 70°12′53″ W; thence to latitude 43°41′49″ N, longitude 70°13′05″ W; thence to latitude 43°42′11″ N, longitude 70°13′30″ W; thence along the shoreline to the point of beginning. DATUM: NAD 83.
(e) Harraseeket River. That portion of the Harraseeket River within the mean low water lines, between Stockbridge Point and Weston Point, excluding therefrom a thoroughfare, 100 feet wide, the center line of which follows the natural channel.
(f) Yarmouth Harbor and adjacent waters—(1) Littlejohn Island/Doyle Point Cousins Island Special Anchorage. All of the waters enclosed by a line connecting the following points: Starting from the northernmost point of Littlejohn Island at latitude 43°45′51.6″ N, longitude 70°06′57.0″ W; thence to latitude 43°45′46.8″ N, longitude 70°06′53.4″ W; thence to latitude 43°45′25.8″ N, longitude 70°07′22.8″ W; thence to latitude 43°45′16.8″ N, longitude 70°07′40.8″ W; thence to latitude 43°44′57.0″ N, longitude 70°08′27.0″ W; thence to latitude 43°44′59.9″ N, longitude 70°08′30.0″ W. DATUM: NAD 83.
(2) Madeleine and Sandy Point Special Anchorage. All of the waters enclosed by a line connecting the following points: Starting from a point northeast of Birch Point on Cousins Island at latitude 43°45′15.1″ N, longitude 70°09′16.8″ W; thence to latitude 43°45′21.0″ N, longitude 70°09′30.0″ W; thence to latitude 43°45′37.8″ N, longitude 70°09′10.8″ W; thence to latitude 43°45′57.0″ N, longitude 70°08′58.8″ W; thence to latitude 43°46′01.3″ N, longitude 70°08′45.0″ W. DATUM: NAD 83.
(3) Drinkwater Point and Princes Point Special Anchorage. All of the waters enclosed by a line connecting the following points: Starting south of Drinkwater Point in Yarmouth, Maine at latitude 43°46′26.8″ N, longitude 70°09′17.0″ W; thence to latitude 43°46′21.0″ N, longitude 70°09′09.6″ W; thence to latitude 43°46′04.2″ N, longitude 70°09′46.2″ W; thence to latitude 43°45′28.8″ N, longitude 70°10′24.0″ W; thence to latitude 43°45′43.2″ N, longitude 70°10′24.0″ W. DATUM: NAD 83.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967]
Editorial Note:For Federal Register citations affecting § 110.5, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.6 Portland Harbor, Portland, Maine (between Little Diamond Island and Great Diamond Island).
Beginning at the southeasterly corner of the wharf, at the most southerly point of Great Diamond Island at latitude 43°40′13″, longitude 70°12′00″; thence extending southwesterly to the northeasterly corner of the wharf on the easterly side of Little Diamond Island at latitude 43°40′03″, longitude 70°12′15″; thence extending along the northerly side of the wharf to its shoreward end at latitude 43°40′03″, longitude 70°12′17″; thence extending along the shoreline of Little Diamond Island to latitude 43°40′11″, longitude 70°12′20″; thence extending northeasterly to the shoreline of the southerly side of Great Diamond Island at latitude 43°40′21″, longitude 70°12′06″; thence extending along the shoreline of Great Diamond Island to the shoreward end of a wharf at latitude 43°40′15″, longitude 70°12′02″; thence extending along the southwesterly side of the wharf to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.6a Fore River, Portland Harbor, Portland, Maine.
The water area beginning at a point on the shoreline near the Coast Guard Base in Position 43-38 43″ N and 070-14 49″ W; thence 319 to position 43-38 55″ N, 070-15 03″ W; thence 50 to position 43-39 06″ N: 070-14 43″ W: thence 161 to mainland; and thence southwesterly along the shore to the point of beginning.
[CGD 01-87-02, 52 FR 9829, Mar. 27, 1987]
§ 110.8 Lake Champlain, N.Y. and Vt.
(a) Ticonderoga, N.Y. An area shoreward of a line bearing 312° from Ticonderoga Light to the southeast corner of the New York State Boat Launching Ramp.
(b) Essex, N.Y. A small cove at the westerly side of Lake Champlain, shoreward of a line connecting the offshore ends of two promontories located at Essex.
(c) Shelburne, Vt. An area shoreward of a line bearing 142° from the eastern point of Collymer Pt. to Allen Hill.
(c-1) Shelburne Bay. Beginning at a point on the shoreline at latitude 44°25′53.0″ N., longitude 73°14′47.3″ W.; thence north to a point at latitude 44°26′04.8″ N., longitude 73°14′46.6″ W.; thence northwesterly to a point on the shoreline at latitude 44°26′06.9″ N., longitude 73°14′50.2″ W.; thence along the shoreline to the point of beginning.
(c-2) Shelburne Bay Allen Hill to La Platte River. That portion of the waters of Shelburne Bay west of the line from a point at Allen Hill at latitude 44°24′35″ N., longitude 73°14′14″ W.; to a point near the mouth of the La Platte River at latitude 44°24′03″ N., longitude 73°14′05″ W.
(d) Mallets Bay, Vt. The southwesterly portion of Mallets Bay, south of Coates Island and west of a line bearing 170° from the most easterly point of Coates Island to the mainland.
(e) Mallets Bay, Vt. An area in the northwesterly portion of Mallets Bay, south of a line extending from the northeasterly end of Mallets Head to the northeasterly end of Marble Island, and west of a line extending from the northeasterly end of Marble Island to the northeasterly side of Cave Island, and southerly to the point on the lower east side of Mallets Head.
(f) St. Albans Bay, Vt. An area in the northerly portion of St. Albans Bay westward of the State Pier at St. Albans Bay State Park, northeasterly of a line bearing 296°30′ from the southwesterly corner of the State Pier, and southeasterly of a line parallel to and 500 feet west of the west side of the State Pier.
(g) Charlotte, Vt. An area shoreward of a line bearing 080 T from 44°16′12″ N, 73°17′18″ W, on Thompson's Point to 44°16′16″ N, 73°16′40″ W., on William's Point.
(h) Burlington Harbor, VT. The waters bounded by a line connecting the following points:
Latitude | Longitude
44°28′14.4″ N | 73°13′16.5″ W
44°28′14.4″ N | 73°13′19.5″ W
44°28′24.4″ N | 73°13′18.4″ W
and thence along the shoreline to the point of the beginning. These positions have been converted to North American Datum 83.
(i) Point Au Roche, New York. The waters of Deep Bay north of a line drawn shore to shore along the 44°46′14″ N line of Latitude.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGFR 70-16A, 35 FR 8823, June 6, 1970; CCGD3-80-2A, 45 FR 54755, July 18, 1980; CGD3-85-02, 51 FR 4593, Feb. 6, 1986; CGD1-90-063, 56 FR 12120, Mar. 22, 1991; CGD1 91-063, 58 FR 21104, Apr. 19, 1993; USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.9 Wells Harbor, Maine.
(a) Anchorage “A”. All of the waters enclosed by a line beginning at latitude 43°19′15.7″ N, longitude 070°33′42.1″ W; thence to latitude 43°19′15.7″ N, longitude 070°33′40.3″ W; thence to latitude 43°19′3.7″ N, longitude 070°33′42.6″ W; thence to latitude 43°19′2.6″ N, longitude 70°33′45.7″ W; thence to the point of beginning. This area is approximately 5,800 sq. yards, encompassing the central portion of Wells Harbor.
(b) Anchorage “B”. All of the waters enclosed by a line beginning at latitude 43°19′11.1″ N, longitude 070°33′49.8″ W; thence to latitude 43°19′10.5″ N, longitude 070°33′47.3″ W; thence to latitude 43°19′8.3″ N, longitude 070°33′47.3″ W; thence to latitude 43°19′8.7″ N, longitude 070°33′50.6″ W; thence to the point of beginning. This area is approximately 25,000 sq. yards, encompassing the western portion of Wells Harbor.
(c) Anchorage “C”. All of the waters enclosed by a line beginning at latitude 43°19′17.7″ N, longitude 070°33′34.0″ W; thence to latitude 43°19′18.4″ N, longitude 070°33′32.9″ W; thence to latitude 43°19′13.8″ N, longitude 070°33′25.5″ W; thence to latitude 43°19′13.0″ N, longitude 070°33′26.2″ W; thence to the point of beginning. This area is approximately 8,200 sq. yards, encompassing the eastern portion of Wells Harbor.
[USCG-2011-0231, 77 FR 25590, May 1, 2012]
§ 110.10 Portsmouth Harbor, New Hampshire, north of Newcastle Island.
From the northern most point of Goat Island to latitude 43°04′25″ N, longitude 070°43′37″ W; thence 089°30′ for 1025 yards; thence 120° for 285 yards, thence 213° to the shoreline of Newcastle Island, thence along the shoreline of Newcastle Island and across the breakwater to Goat Island and to the point of beginning.
[CGD 83-1R, 48 FR 56578, Dec. 22, 1983]
§ 110.25 Salem Sound, Mass.
(a) Beverly Harbor, north of Salem Neck, Salem, MA. A line extending from the northerly end of the Salem Willows Yacht Club House 360 yards bearing 281° true to position latitude 42°32′14.3″ N., longitude 70°52′24.17″ W.; thence north 275 yards to Monument Bar Beacon thence 540 yards bearing 080° to position latitude 42°32′25.3″ N., longitude 70°52′2.1″ W., thence 365 yards bearing 175° to position latitude 42°32′14.3″ N., longitude 70°52′1.1″ W.; thence 237° to the shore. [NAD83]
(b) Bass River. All of the area upstream of the highway bridge (Popes Bridge) outside of the dredged channel.
(c) South Channel. Bounded by a line commencing at the northern most point of Peach's Point at position latitude 42°31′08.6″ N., longitude 70°50′32.8″ W.; thence westerly to a point, at position latitude 42°31′21.9″ N., longitude 70°51′15.1″ W. off Fluen Point; thence westerly to a point at latitude 42°31′19.3″ N., longitude 70°51′47.4″ W. off Naugus Head; thence southwesterly to a point at latitude 42°31′00.3″ N., longitude 70°51′16.6″ W. east of Folger Point; thence to a point at latitude 42°30′38.3″ N., longitude 70°52′34.6″ W.; thence easterly to a point on Long Point at latitude 42°30′52.6″ N., longitude 70°53′05″ W. The areas will be principally for use by yachts and other recreational craft.
(d) Beverly and Mackerel Coves, north side of Beverly Harbor. The water area enclosed by a line commencing at the southernmost point of Curtis Point in Beverly; thence bearing 238°, 1,400 yards to latitude 42°32′29.7″ N., 70°51′32.1″ W.; thence 284°, 1,475 yards to the western shoreline of Mackerel Cove; thence north northeasterly to the point of beginning.
(e) Collins Cove, Salem, MA. The water area enclosed by a line beginning at Monument Bar Beacon; thence 242°, 580 yards to latitude 42°32′14.5″ N., longitude 70°52′46.3″ W.; thence 284°, 220 yards to latitude 42°32′16″ N., longitude 70°52′55″ W.; thence 231°, 525 yards to a point on the shoreline; thence following the shoreline and the western boundary of the special anchorage area as described in 33 CFR 110.25(a) to the point of beginning.
[USCG-2009-0416, 74 FR 27438, June 10, 2009, as amended by USCG-2014-0410, 79 FR 38432, July 7, 2014; USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.26 Marblehead Harbor, Marblehead, Mass.
The area comprises that portion of the harbor lying between the extreme low water line and southwestward of a line bearing 336° from Marblehead Neck Light to a point on Peach Point at latitude 42°31′03″, longitude 70°50′30″.
[CGFR 68-96, 33 FR 12550, Sept. 5, 1968; CGFR 68-157, 34 FR 1380, Jan. 29, 1969, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.27 Lynn Harbor in Broad Sound, Mass.
North of a line bearing 244° from the tower of the Metropolitan District Building, extending from the shore to a point 100 feet from the east limit of the channel; east of a line bearing 358°, extending thence to a point 100 feet east of the northeast corner of the turning basin; south of a line bearing 88°, extending thence to the shore; and south and west of the shoreline to its intersection with the south boundary.
[USCG-2009-0416, 74 FR 27439, June 10, 2009]
§ 110.29 Boston Inner Harbor, Mass.
(a) Vicinity of Pleasant Park Yacht Club, Winthrop. Southerly of a line bearing 276° from a point on the west side of Pleasant Street, Winthrop, 360 feet from the southwest corner of its intersection with Main Street; westerly of a line bearing 186° from a point on the south side of Main Street 140 feet from the southwest corner of its intersection with Pleasant Street; northerly of a line bearing 256° from a point on the west side of Pleasant Street 550 feet from the southwest corner of its intersection with Main Street and easterly of a line bearing 182° from a point on the south side of Main Street 640 feet from the southwest corner of its intersection with Pleasant Street.
(b) Mystic River, east side of Tobin Bridge. Beginning at a line running from a point on the Tobin Bridge at latitude 42°23′08.5″ N. 071°02′48.2″ W. to a point at latitude 42°23′06.4″ N. 071°02′43.7″ W.; thence northwest to a point at latitude 42°23′09.1″ N. 071°02′43.2″ W. along the shoreline to the western side of Tobin Bridge, thence to the point of origin.
(c) Mystic River, west side of Tobin Bridge. Beginning at a line running from a point on the Tobin Bridge at latitude 42°23′08.8″ N. 071°02′48.6″ W. to a point at latitude 42°23′10.5″ N. 071°05′52″ W.; thence northwest to the southeasterly corner of the pier at latitude 42°23′13.4″ N. 071°02′57.1″ W. along the pier to the shoreline to the eastern side of Tobin Bridge, thence to the point of origin.
(d) Boston Inner Harbor A. The waters of the western side of Boston Inner Harbor north of the entrance to the Fort Point Channel bound by the following points beginning at latitude 42°21′32″ N., longitude 071°02′50″ W; thence to latitude 42°21′33″ N., longitude 071°02′44″ W.; thence to latitude 42°21′26″ N., longitude 071°02′36″ W.; thence to latitude 42°21′26″ N., longitude 071°02′53″ W.; thence to point of origin. [NAD83].
[USCG-2009-0416, 74 FR 27439, June 10, 2009, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.30 Boston Harbor, Mass.
(a) Vicinity of South Boston Yacht Club, South Boston. Northerly of a line bearing 96° from the stack of the heating plant of the Boston Housing Authority in South Boston; easterly of a line bearing 5° from the west shaft of the tunnel of the Boston Main Drainage Pumping Station; southerly of the shoreline; and westerly of a line bearing 158° from the northeast corner of the iron fence marking the east boundary of the South Boston Yacht Club property.
(b) Dorchester Bay, in vicinity of Savin Hill Yacht Club. Northerly of a line bearing 64° from the stack of the old power plant of the Boston Elevated Railway on Freeport Street in Dorchester; westerly of a line bearing 163° from the stack of the Boston Main Drainage Pumping Station on the Cow Pasture in Dorchester; and southerly and easterly of the shoreline.
(c) Dorchester Bay, in vicinity of Dorchester Yacht Club. Eastward of a line bearing 21° from the stack located a short distance northwestward of the Dorchester Yacht Club; southward of a line bearing 294° from the southerly channel pier of the highway bridge; westward of the highway bridge and the shoreline; and northward of the shoreline.
(d) Quincy Bay, in vicinity of Wollaston and Squantum Yacht Clubs. Northwesterly of a line bearing 36°30′ from a point on the shore 2,600 feet easterly of the east side of the Wollaston Yacht Club landing; southwesterly of a line bearing 129°15′ from the water tank in Squantum; and southeasterly and northeasterly of the shoreline.
(e) Quincy Bay, in vicinity of Merrymount Yacht Club. South of a line starting from a point bearing 246°, 3,510 yards, from the stack of the pumping station on Nut Island, and extending thence 306° to the shore; west of a line bearing 190° from the aforesaid point to the shore; and north and east of the shoreline.
(f) Weymouth Fore River, in vicinity of Quincy Yacht Club. A line from the position latitude 42°16′46.9″ N. 70°57′12.5″ W. to position latitude 42°16′48.8″ N. 70°57′5.5″ W.; thence to latitude 42°16′31″ N. 70°56′23.1″ W. to the northerly end of Raccoon Island at position latitude 42°15′48″ N. 70°56′43.4″ W.; thence along the western shoreline of Raccoon Island to the point latitude 42°15′46.4″ N. 70°56′55.4″ W.; thence to latitude 42°15′43″ N. 70°57′5.8″ W.; thence along the shoreline to the point of origin. [NAD83]
(g) Weymouth Fore River, in vicinity of Wessagussett Yacht Club. Southwesterly of a line bearing 117° from channel light “4”; southeasterly of a line 150 feet from and parallel to the meandering easterly limit of the dredged channel; easterly of a line bearing 188° from the eastern extremity of Rock Island Head; and northwesterly of the shoreline.
(h) Weymouth Fore River, in the vicinity of Gull Point (PT). All of the waters bound by the following points beginning at latitude 42°15′05″ N., longitude 70°57′26″ W.; thence to latitude 42°15′00″ N., longitude 70°57′26″ W.; thence to latitude 42°15′15″ N., longitude 70°56′50″ W.; thence to latitude 42°15′18″ N., longitude 70°56′50″ W.; thence to the point of the beginning. [NAD83]
(i) Weymouth Back River, in vicinity of Eastern Neck. The cove on the north side of the river lying northerly of a line bearing 264°30′ from the southwesterly corner of the American Agricultural Chemical Company's wharf (Bradley's Wharf) to the shore of Eastern Neck, about 2,200 feet distant.
(j) Area No. 1 in Allerton Harbor. That area north of Spinnaker Island beginning at latitude 42°18′15.3″ N. 70°53′44.1″ W.; thence due east to latitude 42°18′15.3″ N. longitude 70°53′27.6″ W.; thence due south to latitude 42°18′07.8″ N. longitude 70°53′27.6″ W.; thence due west to latitude 42°18′07.8″ N. longitude 70°53′44.1″ W.; thence due north to the point of beginning. [NAD83]
(k) Area No. 2 in Hull Bay. That area south of Hog Island beginning at latitude 42°17′50.8″ N. longitude 70°54′05.1″ W.; thence due east to latitude 42°17′50.8″ N. longitude 70°53′27.6″ W.; thence due south to latitude 42°17′30.3″ N. longitude 70°53′27.6″ W.; thence due west to latitude 42°17′30.3″ N. longitude 70°54′5.1″ W.; thence due north to the point of beginning. [NAD83]
(l) Area No. 3 in Hull Bay. That area north of Bumkin Island beginning at position latitude 42°17′22.3″ N. longitude 70°54′5.1″ W.; thence due east to latitude 42°17′22.3″ N. longitude 70°53′15.6″ W.; thence due south to latitude 42°17′01.3″ N. longitude 70°53′15.6″ W.; thence due west to latitude 42°17′01.3″ N. longitude 70°54′5.17″ W.; thence due north to the point of beginning. [NAD83].
(m) Hingham Harbor Area 1. Beginning at position latitude 42°15′39.3″ N. longitude 70°53′22.1″ W.; thence to latitude 42°15′53.8″ N. longitude 70°53′30.1″ W.; thence to latitude 42°15′56.3″ N. longitude 70°53′21.1″ W.; thence to latitude 42°15′42.3″ N. longitude 70°53′13.1″ W.; thence to point of beginning. [NAD83]
(n) Hingham Harbor Area 2. Beginning at position latitude 42°15′30.6″ N. longitude 70°53′0.5″ W.; thence to latitude 42°15′30.3″ N. longitude 70°53′11.6″ W.; thence to latitude 42°15′27.8″ N. longitude 70°53′16.1″ W.; thence to latitude 42°15′28.8″ N. longitude 70°53′29.1″ W.; thence to latitude 42°15′35.3″ N. longitude 70°53′32.1″ W.; thence to latitude 42°15′36.3″ N. longitude 70°53′34.6″ W.; thence to latitude 42°15′41.3″ N. longitude 70°53′32.6.5″ W.; thence to latitude 42°15′31.3″ N. longitude 70°53′26.1″ W.; thence to latitude 42°15′31.8″ N. longitude 70°53′01.1″ W.; thence to point of beginning. [NAD83]
(o) Hingham Harbor Area 3. Beginning at latitude 42°15′33.3″ N. longitude 70°52′59.6″ W.; thence to latitude 42°15′33.8″ N. longitude 70°53′17.1″ W.; thence to latitude 42°15′35.8″ N. longitude 70°53′00.1″ W.; thence to point of beginning. [NAD83]
(p) Hingham Harbor Area 4. Beginning at position latitude 42°14′47.3″ N. longitude 70°53′07.6″ W.; thence to latitude 42°14′48.8″ N. longitude 70°53′9.6″ W.; thence to latitude 42°14′54.3″ N. longitude 70°53′6.1″ W.; thence to latitude 42°14′56.9″ N. longitude 70°52′56.6″ W.; thence to point of beginning. [NAD83]
(q) Hingham Harbor Area 5. Beginning at position latitude 42°14′48.3″ N. longitude 70°52′55.1″ W.; thence to latitude 42°14′48.8″ N. longitude 70°53′0.1″ W.; thence to latitude 42°14′58.3″ N. longitude 70°52′49.1″ W.; thence to latitude 42°14′53.8″ N. longitude 70°52′48.1″ W.; thence to point of beginning. [NAD83]
[USCG-2009-0416, 74 FR 27439, June 10, 2009, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.31 Hull Bay and Allerton Harbor at Hull, Mass.
(a) Area No. 1 in Allerton Harbor. That area north of Hog Island beginning at latitude 42°18′15″, longitude 70°53′46″; thence due east to latitude 42°18′15″, longitude 70°53′29.5″; thence due south to latitude 42°18′07.5″, longitude 70°53′29.5″; thence due west to latitude 42°18′07.5″, longitude 70°53′46″; thence due north to the point of beginning.
(b) Area No. 2 in Hull Bay. That area south of Hog Island beginning at latitude 42°17′50.5″, longitude 70°54′07″; thence due east to latitude 42°17′50.5″, longitude 70°53′29.5″; thence due south to latitude 42°17′30″, longitude 70°53′29.5″; thence due west to latitude 42°17′30″, longitude 70°54′07″; thence due north to the point of beginning.
(c) Area No. 3 in Hull Bay. That area north of Bumkin Island beginning at latitude 42°17′22″, longitude 70°54′07″; thence due east to latitude 42°17′22″, longitude 70°53′17.5″; thence due south to latitude 42°17′01″, longitude 70°53′17.5″; thence due west to latitude 42°17′01″, longitude 70°54′07″; thence due north to the point of beginning.
[CGFR 68-160, 34 FR 392, Jan. 10, 1969; 34 FR 939, Jan. 22, 1969, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.32 Hingham Harbor, Hingham, Mass.
(a) Area 1. Beginning at latitude 42°15′39″, longitude 70°53′24″; thence to latitude 42°15′53.5″, longitude 70°53′32″; thence to latitude 42°15′56″, longitude 70°53′23″; thence to latitude 42°15′42″, longitude 70°53′15″; thence to point of beginning.
(b) Area 2. Beginning at latitude 42°15′30″, longitude 70°53′02.5″; thence to latitude 42°15′30″, longitude 70°53′13.5″; thence to latitude 42°15′27.5″, longitude 70°53′18″; thence to latitude 42°15′28.5″, longitude 70°53′31″; thence to latitude 42°15′35″, longitude 70°53′34″; thence to latitude 42°15′36″, longitude 70°53′36.5″; thence to latitude 42°15′41″, longitude 70°53′34.5″; thence to latitude 42°15′31″, longitude 70°53′28″; thence to latitude 42°15′31.5″, longitude 70°53′03″; thence to point of beginning.
(c) Area 3. Beginning at latitude 42°15′33″, longitude 70°53′01.5″; thence to latitude 42°15′33.5″, longitude 70°53′19″; thence to latitude 42°15′35.5″, longitude 70°53′02″; thence to point of beginning.
(d) Area 4. Beginning at latitude 42°14′47″, longitude 70°53′09.5″; thence to latitude 42°14′48.5″, longitude 70°53′11.5″; thence to latitude 42°14′54″, longitude 70°53′08″; thence to latitude 42°14′56.5″, longitude 70°52′58.5″; thence to point of beginning.
(e) Area 5. Beginning at latitude 42°14′48″, longitude 70°52′57″; thence to latitude 42°14′48.5″, longitude 70°53′02″; thence to latitude 42°14′58″, longitude 70°52′51″; thence to latitude 42°14′53.5″, longitude 70°52′50″; thence to point of beginning.
[CGFR 68-89, 33 FR 11077, Aug. 3, 1968, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.37 Sesuit Harbor, Dennis, Mass.
All the waters of Sesuit Harbor southerly of a line extending between the outer end of the jetties on each side of the entrance to the Harbor.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.38 Edgartown Harbor, Mass.
An area in the inner harbor easterly of the project channel and south of Chappaquiddick Point bounded as follows: Beginning at latitude 41°23′19″, longitude 70°30′32″; thence southeasterly along the shore to latitude 41°22′52″, longitude 70°30′12″; thence 287°30′ 1,600 feet; thence 327°30′, 700 feet; thence 359° true, 800 feet; thence 24°15′ approximately 900 feet to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.40 Silver Beach Harbor, North Falmouth, Mass.
All the waters of the harbor northward of the inner end of the entrance channel.
§ 110.45 Onset Bay, Mass.
Northerly of a line extending from the northernmost point of Onset Island to the easternmost point of Wickets Island; easterly of a line extending from the easternmost point of Wickets Island to the southwest extremity of Point Independence; southerly of the shore line; and westerly of the shore line and of a line bearing due north from the northernmost point of Onset Island.
§ 110.45a Mattapoisett Harbor, Mattapoisett, Mass.
(a) Area No. 1 beginning at a point on the shore at latitude 41°39′23″ N., longitude 70°48′50″ W.; thence 138.5° T. to latitude 41°38′45″ N., longitude 70°48′02″ W.; thence 031° T. to latitude 41°39′02″ N., longitude 70°47′48″ W.; thence along the shore to the point of beginning.
(b) Area No. 2 beginning at a point on the shore at latitude 41°39′24″ N., longitude 70°49′02″ W.; thence 142.5° T. to latitude 41°38′10″ N., longitude 70°47′45″ W.; thence 219° T. to latitude 41°37′54″ N., longitude 70°48′02″ W.; thence along the shore to the point of beginning.
[CGD 83-2R, 49 FR 25445, June 21, 1984; 49 FR 27320, July 3, 1984, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.46 Newport Harbor, Newport, R.I.
(a) Area No. 1. The waters of Brenton Cove south of a line extending from latitude 41°28′50″ N., longitude 71°18′58″ W.; to latitude 41°28′45″ N., longitude 71°20′08″ W.; thence along the shoreline to the point of beginning.
(b) Area No. 2. The waters east of Goat Island beginning at a point bearing 090°, 245 yards from Goat Island Shoal Light; thence 007°, 505 yards; thence 054°, 90 yards; thence 086°, 330 yards; thence 122°, 90 yards; thence 179°, 290 yards; thence 228°, 380 yards; thence 270°, 250 yards to the point of beginning.
(c) Area No. 3. The waters north of Goat Island Causeway Bridge beginning at Newport Harbor Light; thence 023° to the southwest corner of Anchorage E; thence 081° following the southerly boundary of Anchorage E to the shoreline; thence south along the shoreline to the east foot of the Goat Island Causeway bridge; thence west following Goat Island Causeway Bridge to the shoreline of Goat Island; thence north following the east shore of Goat Island to the point of beginning.
[CGD 76-104, 44 FR 21792, Apr. 12, 1979]
§ 110.47 Little Narragansett Bay, Watch Hill, R.I.
All of the navigable waters of Watch Hill Cove southeasterly of a line beginning at the shore end of the United States project groin on the southerly shore of the cove and running 41°30′ true, to the northerly shore of the cove at a point about 200 feet west of the west side of the shore end of Meadow Lane, with the exception of a 100-foot wide channel running from the westerly end of the cove in a southeasterly direction to the Watch Hill Yacht Club pier, thence along in front of the piers on the easterly side of the cove northerly to the shore at the north end of the cove.
§ 110.48 Thompson Cove on east side of Pawcatuck River below Westerly, R.I.
Eastward of a line extending from the channelward end of Thompson Dock at the northern end of Thompson Cove 184° to the shore at the southern end of Thompson Cove.
§ 110.50 Stonington Harbor, Conn.
(a) Area No. 1. Beginning at the southeastern tip of Wamphassuc Point; thence to the northwesterly end of Stonington Inner Breakwater; thence along the breakwater to longitude 71°54′50.5″; thence to latitude 41°20′25.3″, longitude 71°54′50.5″; thence to a point on the shoreline at latitude 41°20′32″, longitude 71°54′54.8″; thence along the shoreline to the point of beginning.
(b) Area No. 2. Beginning at a point on the shoreline at latitude 41°19′55.8″, longitude 71°54′28.9″; thence to latitude 41°19′55.8″, longitude 71°54′37.1″; thence to latitude 41°20′01.6″, longitude 71°54′38.8″; thence to a point on the shoreline at latitude 41°20′02″, longitude 71°54′34.3″; thence along the shoreline to the point of beginning.
(c) Area No. 3. Beginning at a point on the shoreline at latitude 41°20′29.5″, longitude 71°54′43″; thence to latitude 41°20′25.6″, longitude 71°54′48.5″; thence to latitude 41°20′10.7″, longitude 71°54′48.5″; thence to the shoreline at latitude 41°20′10.7″; thence along the shoreline to the point of beginning.
[CGFR 68-164, 34 FR 1380, Jan. 29, 1969, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.50a Fishers Island Sound, Stonington, Conn.
An area on the east side of Mason Island bounded as follows:
Beginning at the shore line on the easterly side of Mason Island at latitude 41°20′06″; thence due east about 600 feet to latitude 41°20′06″, longitude 71°57′37″; thence due south about 2,400 feet to latitude 41°19′42″, longitude 71°57′37″; thence due west about 1,000 feet to the shore line on the easterly side of Mason Island at latitude 41°19′42″; thence along the shore line to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.50b Mystic Harbor, Groton and Stonington, Conn.
(a) Area No. 1. Beginning at Ram Point on the westerly side of Mason Island at latitude 41°19′44″, longitude 71°58′42″; thence to latitude 41°19′30″, longitude 71°58′43″; thence to latitude 41°19′36″, longitude 71°58′58″; thence to latitude 41°19′45″, longitude 71°58′56″; thence to the point of beginning.
(b) Area No. 2. Beginning at a point about 250 feet southerly of Area 1 and on line with the easterly limit of Area 1 at latitude 41°19′27″, longitude 71°58′44″; thence to latitude 41°19′19″, longitude 71°58′45″; thence to latitude 41°19′25″, longitude 71°58′59″; thence to latitude 41°19′33″, longitude 71°58′58″; thence to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.50c Mumford Cove, Groton, Conn.
(a) Area No. 1. Beginning at a point on the easterly shore of Mumford Cove at latitude 41°19′36″, longitude 72°01′06″; thence to latitude 41°19′30″, longitude 72°01′04″; thence to the shoreline at latitude 41°19′31″, longitude 72°01′00″; and thence along the shoreline to the point of beginning.
(b) Area No. 2. Beginning at a point on the easterly shore of Mumford Cove at latitude 41°19′15″, longitude 72°00′54″; thence to latitude 41°19′14.5″, longitude 72°00′59″; thence to latitude 41°19′11″, longitude 72°00′58″; thence to latitude 41°19′10″, longitude 72°00′54″; thence to latitude 41°19′12.5″, longitude 72°00′52″; thence to latitude 41°19′14″, longitude 72°00′55″; and thence to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.50d Mystic Harbor, Noank, Conn.
The area comprises that portion of the harbor off the easterly side of Morgan Point beginning at a point at latitude 41°19′15″, longitude 71°59′13.5″; thence to latitude 41°19′15″, longitude 71°59′00″; thence to latitude 41°19′02.5″, longitude 71°59′00″; thence to latitude 41°19′06″, longitude 71°59′13.5″; and thence to the point of beginning.
[CGFR 68-3, 33 FR 4738, Mar. 20, 1968, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.51 Groton, Conn.
The waters between an unnamed cove and Pine Island.
(a) Beginning at a point on the shoreline of Avery Point at latitude 41°19′01.4″, longitude 072°03′42.8″; thence to a point in the cove at latitude 41°19′02.5″, longitude 72°03′36.2″; thence southeasterly to a point at latitude 41°18′56.2″, longitude 072°03′34.2″; thence northeasterly to latitude 41°19′02.5″, longitude 072°03′19.2″ thence terminating at the tip of Jupiter Point at latitude 41°19′04.4″, longitude 072°03′19.7″. DATUM: NAD 83
(b) Beginning at a point on the shoreline of Pine Island at latitude 41°18′47.1″, longitude 072°03′36.8″; thence northerly to latitude 41°18′54.1″, longitude 072°03′35.4″; thence northeasterly to a point at latitude 41°19′01.2″, longitude 072°03′19.3″; thence terminating at a point at latitude 41°18′54.0″, longitude 072°03′17.5″. DATUM: NAD 83
[CGD01-97-014, 63 FR 34815, June 26, 1998, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.52 Thames River, New London, Conn.
(a) Area No. 1. An area in the westerly part of Greens Harbor bounded as follows: Beginning at a point on the shore 100 yards southeasterly of the southerly side of Thames Street extended; thence 84°, 420 yards; thence 156°, 425 yards; thence 240°, 210 yards, to the shore; and thence northwesterly along the shore to the point of beginning.
(b) Area No. 2. An area in the westerly part of Greens Harbor bounded as follows: Beginning at a point on the shore 15 yards southeasterly of the southerly side of Converse Place extended; thence 54°, 170 yards; thence 114°30′, 550 yards; thence 266°30′, 250 yards; thence 234°, 230 yards, to the shore; and thence northwesterly along the shore to the point of beginning.
(c) Area No. 3. An area on the westerly side of the Thames River in the vicinity of Jacobs Rock, the location of the U.S. Coast Guard Academy Sailing Center, bounded as follows: Beginning at the point on the shore where the north side of the Jacobs Rock causeway meets the western shoreline; thence northerly along the western shore of the Thames River a distance of 200 yards: thence 090°, 240 yards; thence 180°, 200 yards to the Jacobs Rock causeway; thence westerly along the causeway to the point of beginning.
(d) Area No. 4. An area in the western part of the Thames River, north of the highway bridge, bounded as follows: Beginning at a point 125 yards north of the highway bridge at latitude 41°21′56″ N., longitude 72°05′32″ W.; thence easterly to latitude 41°21′56″ N., longitude 72°05′27″ W.; thence northerly to latitude 41°22′12″ N., longitude 72°05′27″ W.; thence westerly to latitude 41°22′12″ N., longitude 72°05′47″ W.; thence southeasterly to latitude 41°22′02″ N., longitude 72°05′40″ W.; thence downriver along the charted foul grounds to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD3-84-37, 49 FR 36840, Sept. 20, 1984; CGD3 85-67, 51 FR 32317, Sept. 11, 1986, USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.53 Niantic, Conn.
Beginning on the shoreline at latitude 41°18′25.3″, longitude 72°12′16.3″; thence to latitude 41°18′23.3″, longitude 72°12′11.6″; thence to latitude 41°18′50.7″, longitude 72°11′51.5″; thence to the shoreline at latitude 41°18′56.5″, longitude 72°12′05.6″; thence along the shoreline to the point of beginning.
[CGFR 69-24, 34 FR 6480, Apr. 15, 1969, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.54 Long Island Sound, on west side of entrance to Pataguanset River, Conn.
An area east of Giants Neck (formerly known as Grant Neck) described as follows: Beginning at a point bearing 114°, 75 feet, from the outer end of the breakwater at the south end of Giants Neck; thence 90°, 1,050 feet; thence 22°17′30″, 2,140 feet; thence 283°- 27′15.5″, 240 feet; thence 220°36′39″, 1,252.6 feet; thence 295°23′16.5″, 326.5 feet; thence 269°02′42.6″, 240 feet; thence 261°46′50.9″, 181.9 feet; thence 226°28′07.7″, 275.9 feet; thence 147°43′27.7″, 449.4 feet; thence 238°01′35.8″, 379.6 feet; and thence approximately 156°31′05.8″, 462.11 feet, to the point of beginning.
§ 110.55 Connecticut River, Conn.
(a) West of Calves Island at Old Saybrook. Beginning at a point bearing 254°09′16″, 153 yards, from Calves Island 20 Light; thence 157°, 1,037 yards; thence 175°, 150 yards; thence 265°, 250 yards; thence 350°, 660 yards; thence 337°, 460 yards; and thence approximately 67°, 135 yards, to the point of beginning.
(a-1) Area No. 1, at Essex. Beginning at a point on the shore on the west side of Haydens Point bearing approximately 211°, 270 yards, from Haydens Point Light; thence 270°, 160 yards; thence due north, 140 yards; thence 300°, 190 yards; thence 330°, 400 yards; thence 90°, 60 yards; thence 150°, 350 yards; thence 120°, about 434 yards to a point on the shore; thence along the shore southwesterly to the point of beginning.
(b) Area No. 2, at Essex. Beginning at a point latitude 41°21′22″, longitude 72°22′53″; thence 205°30′, 375 yards; thence 194°31′, 100 yards; thence 185°00′, 440 yards; thence 153°30′, 80 yards; thence 121°00′, 220 yards; thence due north approximately 1060 yards to the point of beginning.
(c) West of Brockway Island at Essex. That portion of the waters northwest of a line ranging 238° from latitude 41°22′20.7″, longitude 72°22′49.8″ to the shoreline; southwest of a line connecting a point at latitude 41°22′20.7″, longitude 72°22′49.8″ and a point at latitude 41°22′28.2″, longitude 72°22′56″; and southeast of a line ranging 238° from latitude 41°22′28.2″, longitude 72°22′56″ to the shoreline.
(d) Upper Bay—(1) Anchorage No. 20-A. (i) All waters bound by the following points: latitude 40°42′06.9″ N., longitude 074°02′18.0″ W.; thence to latitude 40°42′05.4″ N., longitude 074°01′56.9″ W.; thence to latitude 40°41′54.9″ N., longitude 074°01′57.7″ W.; thence to latitude 40°41′54.0″ N., longitude 074°02′12.0″ W.; thence to latitude 40°41′54.4″ N., longitude 074°02′11.7″ W.; thence to latitude 40°41′57.5″ N., longitude 074°02′07.5″ W.; thence to latitude 40°42′06.1″ N., longitude 074°02′19.1″ W.; thence to the point of origin (NAD 83).
(ii) See 33 CFR 110.155(d)(6), (d)(16), and (l).
(2) Anchorage No. 20-B. (i) All waters bound by the following points: latitude 40°41′46.2″ N., longitude 074°02′23.0″ W.; thence to latitude 40°41′42.4″ N., longitude 074°02′00.5″ W.; thence to latitude 40°41′35.7″ N., longitude 074°02′02.7″ W.; thence to latitude 40°41′30.3″ N., longitude 074°02′06.3″ W.; thence to latitude 40°41′41.9″ N., longitude 074°02′29.2″ W.; thence to the point of origin (NAD 83).
(ii) See 33 CFR 110.155(d)(6), (d)(16), and (l).
(3) Anchorage No. 20-C. (i) All waters bound by the following points: latitude 40°41′42.4″ N., longitude 074°02′41.5″ W.; thence to latitude 40°41′25.8″ N., longitude 074°02′09.2″ W.; thence to latitude 40°41′02.1″ N., longitude 074°02′24.7″ W.; thence to latitude 40°41′09.4″ N., longitude 074°02′40.0″ W.; thence to latitude 40°41′13.3″ N., longitude 074°02′41.5″ W.; thence to latitude 40°41′15.8″ N., longitude 074°02′32.6″ W.; thence to latitude 40°41′25.3″ N., longitude 074°02′29.1″ W.; thence to latitude 40°41′33.0″ N., longitude 074°02′44.5″ W.; thence to latitude 40°41′32.5″ N., longitude 074°02′48.8″ W.; thence to the point of origin (NAD 83).
(ii) See 33 CFR 110.155(d)(6), (d)(16), and (l).
(e) Area No. 2, at Lord Island. Beginning at latitude 41°26′11″, longitude 72°27′16″; thence extending south southeasterly to latitude 41°26′03″, longitude 72°27′02″; thence extending southeasterly to latitude 41°25′59″, longitude 72°26′51″; thence extending southwesterly to latitude 41°25′58″, longitude 72°26′52″; thence extending northwesterly to latitude 41°26′05″, longitude 72°27′11″; thence extending north northwesterly to latitude 41°26′10″, longitude 72°27′20″; thence extending easterly to the point of beginning.
(e-1) Area No. 1 at Chester. Beginning at a point about 600 feet southeasterly of the entrance of Chester Creek, at latitude 41°24′23″, longitude 72°25′41″; thence due south about 1,800 feet to latitude 41°24′05″, longitude 72°25′41″; thence due east about 600 feet to latitude 41°24′05″, longitude 72°25′32″; thence due north about 1,800 feet to latitude 41°24′23″, longitude 72°25′32″; thence due west about 600 feet to the point of beginning.
(e-2) Area No. 2 at Chester. That area south of latitude 41°24′43.9″, west of longitude 72°25′35″, north of latitude 41°24′33.4″, and east of longitude 72°25′40.8″.
(f) Vicinity of Mouse Island Bar below Portland. On the north side of the river shoreward of lines described as follows: (1) Beginning at a point bearing 02°, 175 yards, from Mouse Island 73 Light; thence 270°, 480 yards; and thence due north, approximately 230 yards, to the shore. (2) Beginning at the said point bearing 02°, 175 yards, from Mouse Island 73 Light; thence 70°, 400 yards; and thence 350°, approximately 250 yards, to the shore.
(g) Area at Portland. Beginning at a point on the shore, about 700 feet southeasterly from the easterly end of the New York, New Haven and Hartford Railroad Company bridge, at latitude 41°33′55″, longitude 72°38′43″; thence 250° to latitude 41°33′54″, longitude 72°38′46″; thence 160° to latitude 41°33′48″, longitude 72°38′43″; thence 145° to latitude 41°33′44″, longitude 72°38′39″; thence 55° to a point on the shore at latitude 41°33′47″, longitude 72°38′32″; thence along the shore to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGFR 68-137, 33 FR 18279, Dec. 10, 1968; CGFR 68-139, 33 FR 18437, Dec. 12, 1968; USCG-2009-0416, 74 FR 27440, June 10, 2009; USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.55a Five Mile River, Norwalk and Darien, Conn.
The water area of the Five Mile River beginning at a point on the southeast shore of Butler Island at latitude 41°03′27.5″ N., longitude 73°26′52″ W.; thence following the shoreline northerly along the westerly side of Five Mile River to the highway bridge at Route 136 (White Bridge); thence easterly along the southerly side of the highway bridge to the easterly side of Five Mile River; thence following the shoreline southerly along the easterly side of Five Mile River to a point on the southwest shore at Rowayton at latitude 41°03′30″ N., longitude 73°26′47″ W., thence 242° to the point of beginning, except those areas within the designated project channel as shown by dotted lines on the Five Mile River on Chart No. 12368 (formerly C and GS Chart No. 221) issued by National Oceanic and Atmospheric Administration, U.S. Department of Commerce.
[CGD 76-44, 41 FR 40467, Sept. 20, 1976, as amended by USCG-2019-0952, 88 FR 16187, Mar. 16, 2023]
§ 110.55b Connecticut River, Old Saybrook, Connecticut.
(a) Special anchorage area A. All of the waters enclosed by a line beginning at latitude 41°19′54.75″ N., longitude 072°21′08.40″ W.; thence to latitude 41°19′21.50″ N., longitude 072°20′49.65″ W.; thence to latitude 41°19′17.80″ N., longitude 072°20′49.25″ W.; thence to latitude 41°19′17.05″ N., longitude 72°20′59″ W.; thence to latitude 41°19′25.40″ N., longitude 72°21′00.95″ W.; thence to latitude 41°19′29.50″ N., longitude 72°21′17.60″ W.; thence to latitude 41°19′35.40″ N., longitude 72°21′22.90″ W.; thence to latitude 41°19′52.35″ N., longitude 72°21′26.10″ W.; thence to the point of beginning.
(b) Special anchorage area B. All of the waters enclosed by a line beginning at latitude 41°17′26″ N., longitude 072°21′04″ W.; thence to latitude 41°17′24.60″ N., longitude 072°21′16″ W.; thence to latitude 41°17′20″ N., longitude 072°21′09″ W.; thence to latitude 41°17′16″ N., longitude 072°21′05″ W.; thence to latitude 41°17′16″ N., longitude 072°21′03″ W.; thence to latitude 41°17′21.5″ N., longitude 072°21′04.5″ W.; thence to the point of beginning.
(c) Special anchorage area C. All of the waters enclosed by a line beginning at latitude 41°17′27″ N., longitude 072°21′35″ W.; thence to latitude 41°17′24″ N., longitude 072°22′01″ W.; thence to latitude 41°17′16″ N., longitude 072°22′00″ W.; thence to latitude 41°17′19″ N., longitude 072°21′33″ W.; thence to the point of beginning.
[USCG-2012-0806, 81 FR 12823, Mar. 11, 2016, as amended by USCG-2019-0952, 88 FR 16188, Mar. 16, 2023]
§ 110.56 Noroton Harbor, Darien, Conn.
(a) Beginning at a point on the southwesterly side of Long Neck Point at latitude 41°02′10″, longitude 73°28′44″; thence northwesterly to latitude 41°02′17″, longitude 73°29′11″; thence in a north-northwesterly direction to the southeast side of Pratt Island at latitude 41°02′28″, longitude 73°29′17″; thence following the shoreline around the easterly and northerly sides of Pratt Island, the westerly and northerly sides of Pratt Cove, and the westerly side of the Darien River to the causeway and dam at Gorham Pond on the north; thence along the downstream side of the causeway and dam to the easterly side of the Darien River, thence along the easterly shoreline to the point of beginning.
[CGFR 68-122, 33 FR 18238, Dec. 7, 1968, as amended by USCG-2019-0952, 88 FR 16188, Mar. 16, 2023]
§ 110.58 Cos Cob Harbor, Greenwich, Conn.
(a) Area A. Beginning at the mean low water line about 2,800 feet downstream from the easterly end of the New York, New Haven and Hartford Railroad Bridge at latitude 41°01′23″, longitude 73°35′40″; thence extending True west to latitude 41°01′23″, longitude 73°35′42″; thence extending southwesterly to a point at latitude 41°01′02″, longitude 73°35′50″; thence True east to a point on the shoreline at latitude 41°01′02″, longitude 73°35′48″; thence extending along the mean low water line to the point of beginning.
(b) Area B. Beginning at the mean low water line about 700 feet downstream from the westerly end of the New York, New Haven and Hartford Railroad Bridge at latitude 41°01′42″, longitude 73°35′47″; thence True east to latitude 41°01′42″, longitude 73°35′45″; thence southeasterly to latitude 41°01′23″, longitude 73°35′44″; thence southwesterly to latitude 41°01′04″, longitude 73°35′52″, thence southwesterly to latitude 41°01′02″, longitude 73°35′55″; thence True west to a point on shore on the northerly side of Goose Island at latitude 41°01′02″, longitude 73°36′00″; thence True north to a point at the mean low water line at latitude 41°01′05″, longitude 73°36′00″; thence along the mean low water line to the point of beginning.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2019-0952, 88 FR 16188, Mar. 16, 2023]
§ 110.59 Eastern Long Island, NY.
(a) Huntington Harbor. Beginning on the shoreline at latitude 40°54′19.5″, longitude 73°26′07.9″; thence to latitude 40°54′19.5″, longitude 73°26′02.4″; thence along the eastern shoreline to the Mill Dam Road Bridge; thence along the downstream side of the bridge to the westerly side of Huntington Harbor; thence along the western shoreline to the point of beginning.
(b) Centerport Harbor. Beginning at the shoreline at latitude 40°54′00″ , longitude 73°22′55.3″; thence to latitude 40°54′03.8″, longitude 73°22′52.1″; thence along the eastern shoreline to the Mill Dam Bridge; thence along the downstream side of the bridge to the westerly side of Centerport Harbor; thence along the western shoreline to the point of beginning.
(c) Northport Harbor. Beginning on the shoreline at 40°54′25″ N., 73°22′05″ W.; thence to 40°54′37.5″ N., 73°21′32.9″ W.; thence along the eastern shoreline to 40°53′33.1″ N., 73°21′28.2″ W.; thence to 40°53′25.8″ N., 73°21′37.7″ W.; thence along the shoreline to the point of beginning.
(d) Cold Spring Harbor. That portion of the waters of Cold Spring Harbor easterly of a line ranging from the cupola in the extreme inner harbor through Cold Spring Harbor Light; southerly of a line ranging from the southernmost point of an L-shaped pier off Wawepex Grove through the Clock Tower at Laurelton and northerly of a line ranging from the outer end of the Socony Mobil Oil Company's pier at Cold Spring Harbor through the Clock Tower at Laurelton, with the exception of an area within a 300-foot radius of the outer end of the Socony Mobil Oil Company's pier.
(e) Oyster Bay Harbor, New York. That portion of Oyster Bay Harbor adjacent to the easterly side of Centre Island, westerly of a line on range with Cold Spring Harbor Light and the Stone House on the end of Plum Point, Centre Island.
(f) Harbor of Oyster Bay, Oyster Bay, New York. The water area north of the town of Oyster Bay enclosed by a line beginning on the shoreline at latitude 40°52′35.5″ N., longitude 73°32′17″ W.; thence to latitude 40°52′59.5″ N., longitude 73°32′18″ W.; thence to latitude 40°53′00″ N., longitude 73°30′53″ W.; thence to latitude 40°52′39″ N., longitude 73°30′54″ W.; thence to the shoreline at latitude 40°52′25″ N., longitude 73°31′18″ W.; thence following the shoreline to the point of beginning.
(g) Harbor of Oyster Bay, New York, Moses Point to Brickyard Point. That portion of the waters of the Harbor of Oyster Bay enclosed by a line beginning at Moses Point on Centre Island at latitude 40°53′11″ N., longitude 73°31′14″ W.; thence to latitude 40°53′02″ N., longitude 73°31′22″ W.; thence to latitude 40°53′02″ N., longitude 73°32′00″ W.; thence to Brickyard Point on Centre Island at 40°53′06″ N., longitude 73°32′00″ W.; thence following the shoreline to the point of beginning.
(h) Coecles Harbor at Shelter Island, New York. That portion of Coecles Harbor bounded on the North by a line drawn between the northernmost point of land at Sungic Point and latitude 41°04′09″ North, longitude 72°17′54″ West, thence eastward along the shoreline to the point of origin.
(i) West Neck Harbor at Shelter Island, New York. That portion of West Neck Harbor bounded on the North by a line drawn between latitude 41°02′48″ North, longitude 72°20′27″ West and a point on Shell Beach located at latitude 41°02′29″ North, longitude 72°20′59″ West; thence eastward along the shoreline to the point of origin.
[USCG-2008-0179, 73 FR 35009, June 19, 2008, as amended by USCG-2014-0410, 79 FR 38432, July 7, 2014; USCG-2019-0952, 88 FR 16188, Mar. 16, 2023]
§ 110.60 Captain of the Port, New York.
(a) Western Long Island Sound. (1) Glen Island. All waters surrounding Glen Island bound by the following points: 40°52′53.1″ N, 073°46′58.9″ W; thence to 40°52′46.6″ N, 073°47′02.7″ W; thence to 40°53′01.3″ N, 073°47′22.6″ W; thence to a line drawn from 40°53′24.4″ N, 073°46′56.7″ W to 40°53′20.6″ N, 073°46′51.2″ W, excluding all waters within 25 feet of the 50-foot channel west and south of Glen Island.
(2) Echo Bay. All waters northwest of a line drawn from 40°54′10.0″ N, 073°45′52.9″ W to 40°54′25.0″ N, 073°45′38.4″ W.
(3) Glen Island, East. All waters east of Glen Island, bound by the following points: 40°53′01.4″ N, 073°46′51.4″ W; thence to 40°53′03.1″ N, 073°46′44.4″ W; thence to 40°53′06.2″ N, 073°46′38.0″ W; thence to 40°53′15.0″ N, 073°46′44.0″ W; thence along the shoreline to the point of origin.
(4) City Island, Eastern Shore. All waters bound by the following points: 40°50′12.0″ N, 073°46′57.3″ W; thence to 40°50′31.9″ N, 073°46′18.3″ W; thence to 40°51′17.0″ N, 073°46′49.9″ W; thence to 40°51′19.8″ N, 073°46′51.3″ W; thence to 40°51′47.0″ N, 073°47′02.5″ W; thence to 40°51′28.5″ N, 073°47′31.7″ W; thence to 40°51′25.1″ N, 073°47′29.9″ W; thence along the shoreline to the point of origin, excluding the Cable and Pipeline Area between City and Hart Islands.
(5) City Island, Western Shore. All waters bound by the following points: 40°50′11.6″ N, 073°46′58.4″ W; thence to 40°50′02.5″ N, 073°47′23.3″ W; thence to 40°50′43.7″ N, 073°47′56.0″ W; thence to 40°51′15.9″ N, 073°47′36.0″ W; thence to 40°51′15.9″ N, 073°47′28.6″ W; thence along the shoreline to the point of origin.
(6) Eastchester Bay, Western Shore. All waters shoreward of a line connecting the following points: 40°49′31.3″ N, 073°48′26.3″ W; thence to 40°50′56.4″ N, 073°48′49.2″ W; thence to 40°50′55.3″ N, 073°48′55.4″ W; thence along the shoreline to the point of origin.
(7) Eastchester Bay, Locust Point. All waters west of a line drawn from 40°48′56.3″ N, 073°47′56.2″ W to 40°48′34.4″ N, 073°47′56.2″ W.
(8) Manhasset Bay, Plum Point. All waters bound by the following points: 40°50′02.9″ N, 073°43′37.3″ W; thence to 40°49′54.0″ N, 073°43′14.9″ W; thence to 40°50′06.6″ N, 073°42′51.0″ W; thence to 40°50′18.6″ N, 073°42′51.0″ W; thence along the shoreline to the point of origin; excluding the seaplane restricted area described in § 162.
(9) Manhasset Bay, Toms Point. All waters bound by the following points: 40°50′20.6″ N, 073°42′49.5″ W; thence to 40°50′05.3″ N, 073°42′49.4″ W; thence to 40°49′58.6″ N, 073°42′39.0″ W; thence to 40°49′48.9″ N, 073°42′55.6″ W; thence to 40°49′49.3″ N, 073°42′20.4″ W; thence to 40°50′02.5″ N, 073°42′14.2″ W; thence to 40°50′11.8″ N, 073°42′15.4″ W; thence along the shoreline to the point of origin.
(10) Manhasset Bay, at Port Washington. All waters bound by the following points: 40°49′44.9″ N, 073°42′11.3″ W; thence to 40°49′44.3″ N, 073°43′03.2″ W; thence to 40°49′06.8″ N, 073°42′46.6″ W; thence to 40°49′07.0″ N, 073°42′16.2″ W; thence along the shoreline to the point of origin.
(11) Manhasset Bay, West Shore. All waters bound by the following points: 40°49′24.6″ N, 073°43′40.2″ W; thence to 40°49′33.2″ N, 073°43′28.3″ W; thence to 40°49′43.8″ N, 073°43′53.5″ W; thence to 40°49′39.2″ N, 073°43′57.9″ W; thence along the shoreline to the point of origin.
(12) Manhasset Bay, Plandome. All waters bound by the following points: 40°48′41.6″ N, 073°42.31.7″ W; thence to 40°48′43.6″ N, 073°42′42.5″ W; thence to 40°48′29.0″ N, 073°42′44.4″ W; thence to 40°48′27.3″ N, 073°42′35.6″ W; thence along the shoreline to the point of origin.
(13) Elm Point. All waters bound by the following points: 40°49′01.0″ N, 073°45′41.9″ W; thence to 40°49′04.4″ N, 073°45′45.3″ W; thence to 40°49′13.8″ N, 073°45′38.7″ W; thence to 40°49′18.9″ N, 073°45′28.3″ W; thence to 40°49′08.9″ N, 073°45′17.5″ W; thence along the shoreline to the point of origin.
(14) Little Neck Bay. All waters east of a line drawn from 40°47′39.4″ N, 073°46.27.1″ W; thence to 40°48′36.6″ N, 073°45′58.5″ W; thence to 40°48′36.4″ N, 073°45.48.4″ W; thence along the shoreline to the point of origin.
(15) Hempstead Harbor, Mosquito Neck. All waters bound by the following points: 40°51′43.0″ N, 073°39′37.1″ W; thence to 40°51′09.4″ N, 073°39′32.4″ W; thence to 40°51′14.6″ N, 073°39′08.9″ W; thence to 40°51′20.0″ N, 073°38′56.1″ W; thence along the shoreline and breakwater to the point of origin.
(16) Hempstead Harbor, Sea Cliff. All waters bound by the following points: 40°51′16.7″ N, 073°38′51.9″ W; thence to 40°51′12.9″ N, 073°39′07.2″ W; thence to 40°51′03.6″ N, 073°39′31.6″ W; thence to 40°50′24.7″ N, 073°39′26.4″ W; thence to 40°50′22.0″ N, 073°39′10.2″ W; thence along the shoreline to the point of origin.
(b) East River and Flushing Bay. (1) Flushing Bay, College Point North. All waters bound by the following points: 40°47′37.5″ N, 073°51′13.4″ W; thence to 40°47′10.3″ N, 073°51′34.0″ W; thence to 40°47′09.1″ N, 073°51′32.6″ W; thence along the shoreline to the point of origin.
(2) Flushing Bay, College Point South. All waters bound by the following points: 40°47′01.8″ N, 073°51′29.2″ W; thence to 40°47′01.8″ N, 073°51′33.2″ W; thence to 40°46′31.7″ N, 073°51′15.9″ W; thence to 40°46′46.1″ N, 073°50′58.6″ W; thence along the shoreline to the point of origin.
(3) Flushing Bay, Cape Ruth. All waters bound by the following points: 40°46′39.9″ N, 073°50′56.1″ W; thence to 40°46′29.2″ N, 073°51′14.3″ W; thence to 40°46′12.3″ N, 073°51′04.3″ W; thence to 40°46′15.2″ N, 073°50′55.2″ W; thence along the shoreline to the point of origin.
(4) Flushing Bay, Southeast Area. All waters south of a line drawn from 40°45′41.4″ N, 073°50′57.2″ W to 40°45′51.7″ N, 073°50′34.2″ W.
(5) Flushing Bay, Southwest Area. All waters bound by the following points: 40°45′36.7″ N, 073°51′16.3″ W; thence to 40°45′48.5″ N, 073°50′58.4″ W; thence to 40°45′51.3″ N, 073°50′59.2″ W; thence to 40°45′49.4″ N, 073°51′07.5″ W; thence to 40°45′58.7″ N, 073°51′13.4″ W; thence to 40°46′02.1″ N, 073°51′20.1″ W; thence to 40°45′54.8″ N, 073°51′28.7″ W; thence to 40°45′46.2″ N, 073°51′35.3″ W; thence northward along the shoreline and breakwater to the point of origin.
(6) Flushing Bay, West Area. All waters bound by the following points: 40°46′51.1″ N, 073°52′07.3″ W; thence to 40°47′11.2″ N, 073°51′47.1″ W; thence to 40°47′01.9″ N, 073°51′39.6″ W; thence to 40°46′28.3″ N, 073°51′20.0″ W; thence to the point of origin.
(7) Bowery Bay. All waters bound by the following points: 40°46′58.4″ N, 073°53′44.1″ W; thence to 40°47′03.3″ N, 073°53′37.4″ W; thence to 40°47′00.3″ N, 073°53′29.3″ W; thence to 40°46′57.0″ N, 073°53′29.8″ W; thence to 40°46′59.9″ N, 073°53′34.2″ W; thence to 40°46′58.5″ N, 073°53′35.8″ W; thence to 40°46′57.1″ N, 073°53′33.8″ W; thence to 40°46′55.9″ N, 073°53′35.2″ W; thence to 40°46′58.2″ N, 073°53′39.0″ W; thence to 40°46′56.1″ N, 073°53′41.4″ W; thence along the shoreline and pier to the point of origin.
(c) Hudson River. (1) Yonkers, Greystone Station. All waters bound by the following points: 40°58′19.8″ N, 073°53′22.8″ W; thence to 40°58′21.1″ N, 073°53′28.7″ W; thence to 40°58′42.7″ N, 073°53′20.3″ W; thence to 40°58′41.8″ N, 073°53′15.4″ W; thence along the shoreline to the point of origin.
(2) Yonkers, North Glenwood. All waters bound by the following points: 40°57′26.8″ N, 073°53′46.6″ W; thence to 40°57′27.3″ N, 073°53′48.8″ W; thence to 40°57′55.3″ N, 073°53′34.4″ W; thence to 40°57′53.6″ N, 073°53′28.6″ W; thence along the shoreline to the point of origin.
(3) Nyack. That portion of the Hudson River bound by the following points: 41°06′06.8″ N, 073°54′55.5″ W; thence to 41°06′06.8″ N, 073°54′18.0″ W; thence to 41°05′00.0″ N, 073°54′18.0″ W; thence to 41°05′00.0″ N, 073°55′02.2″ W; thence along the shoreline to the point of origin (NAD 1983), excluding a fairway in the charted cable area that is marked with buoys.
(4) Manhattan, Fort Washington Point. All waters bound by the following points: 40°51′08.1″ N, 073°56′36.7″ W; thence to 40°51′09.4″ N, 073°56′40.9″ W; thence to 40°52′08.3″ N, 073°55′56.6″ W; thence along the shoreline to the point of origin.
(5) Yonkers, Main Street. All waters bound by the following points 40°56′15.4″ N, 073°54′11.2″ W; thence to 40°56′16.7″ N, 073°54′20.2″ W; thence to 40°56′08.9″ N, 073°54′22.6″ W; thence to 40°56′07.9″ N, 073°54′16.9″ W; thence to 40°56′07.0″ N, 073°54′17.3″ W.
(6) Yonkers, JFK Marina. All waters bound by the following points: 40°57′28.5″ N, 073°53′46.0″ W; thence to 40°57′30.5″ N, 073°53′56.8″ W; thence to 40°57′07.5″ N, 073°54′06.2″ W; thence to 40°57′06.0″ N, 073°53′59.5″ W; thence along the shoreline to the point of origin.
(7) Hastings-on-Hudson. All waters bound by the following points: 40°59′56.0″ N, 073°53′05.4″ W; thence to 40°59′56.3″ N, 073°53′09.6″ W; thence to 41°00′05.1″ N, 073°53′09.2″ W; thence to 41°00′14.7″ N, 073°53′06.4″ W; thence to 41°00′14.5″ N, 073°53′00.5″ W; thence along the shoreline to the point of origin.
(8) Tarrytown. All waters bound by the following points: 41°04′21.0″ N, 073°52′03.4″ W; thence to 41°04′21.0″ N, 073°52′11.3″ W; thence to 41°04′13.6″ N, 073°52′11.0″ W; thence to 41°04′13.6″ N, 073°52′00.5″ W; thence along the shoreline to the point of origin.
(9) West Point. All waters west of a line drawn from 41°23′10.0″ N, 073°57′18.1″ W to 41°23′23.5″ N, 073°57′11.5″ W.
(10) Haverstraw. That portion of the Hudson River bound by the following points: 41°11′25.2″ N, 073°57′19.9″ W; thence to 41°11′34.2″ N, 073°57′00.8″ W; thence to 41°11′41.9″ N, 073°57′07.5″ W; thence to 41°11′31.8″ N, 073°57′26.5″ W; thence to 41°11′30.8″ N, 073°57′24.9″ W; thence to the point of origin.
(11) Cedar Hill. All waters bound by the following points: 42°32′33.1″ N, 073°45′33.1″ W; thence to 42°32′33.1″ N, 073°45′28.3″ W; thence to 42°32′49.2″ N, 073°45′26.6″ W; thence to 42°32′49.3″ N, 073°45′31.1″ W; thence along the shoreline to the point of origin.
(12) 79th Street Boat Basin South. All waters of the Hudson River enclosed by a line beginning at the northwest corner of the 70th Street pier at approximate position 40°46′47.10″ N, 073°59′29.13″ W; thence to 40°47′02.60″ N, 073°59′17.88″ W; thence to 40°46′59.73″ N, 073°59′13.01″ W; thence along the shoreline and pier to the point of beginning.
(13) 79th Street Boat Basin North. All waters of the Hudson River enclosed by a line beginning on the shoreline near West 110th Street at approximate position 40°48′21.06″ N, 073°58′15.72″ W; thence to 40°48′21.06″ N, 073°58′24.00″ W; thence to 40°47′14.70″ N, 073°59′09.00″ W; thence to 40°47′11.84″ N, 073°59′08.90″ W; thence along the breakwater and shoreline to the point of beginning.
(d) New York Harbor—(1) Newark Bay, Southeast. All waters bound by the following points: 40°39′27.9″ N, 074°08′07.1″ W; thence to 40°39′31.7″ N, 074°08′13.4″ W; thence to 40°39′31.4″ N, 074°08′24.6″ W; thence to 40°39′52.4″ N, 074°08′11.7″ W; thence to 40°39′47.8″ N, 074°07′59.4″ W; thence along the shoreline to the point of origin.
(2) Great Kills Harbor. All waters northeast of a line connecting the following points: 40°32′06.4″ N, 074°08′24.5″ W; thence to 40°32′06.9″ N, 074°08′25.8″ W; thence to 40°32′19.0″ N, 074°08′21.1″ W; thence to 40°32′28.1″ N, 074°08′24.3″ W; thence to 40°32′40.3″ N, 074°08′08.4″ W; thence to 40°32′45.2″ N, 074°08′11.4″ W; thence along the northern and eastern shoreline to the point of origin.
(3) Jamaica Bay, Canarsie Beach. All waters bound by the following points: 40°37′22.0″ N, 073°53′43.5″ W; thence to 40°37′18.4″ N, 073°53′32.9″ W; thence to 40°37′37.6″ N, 073°53′06.5″ W; thence to 40°37′42.9″ N, 073°53′14.4″ W; thence along the shoreline to the point of origin.
(4) Jamaica Bay, East Broad Channel. All waters bound by the following points: 40°35′48.5″ N, 073°49′12.5″ W; thence to 40°35′50.2″ N, 073°49′04.7″ W; thence to 40°36′23.4″ N, 073°48′56.3″ W; thence along the shoreline to the point of origin.
(5) Sheepshead Bay, West. All waters bound by the following points: 40°35′00.0″ N, 073°56′54.8″ W; thence to 40°34′58.9″ N, 073°57′09.6″ W; thence to 40°34′56.6″ N, 073°57′09.1″ W; thence to 40°34′57.5″ N, 073°56′54.4″ W; thence to the point of origin.
(6) Sheepshead Bay, North. All waters bound by the following points: 40°34′58.5″ N, 073°56′00.5″ W; thence to 40°34′58.6″ N, 073°56′26.0″ W; thence to 40°34′56.6″ N, 073°56′26.8″ W; thence to 40°34′54.8″ N, 073°56′24.8″ W; thence to 40°34′55.4″ N, 073°56′10.1″ W; thence to 40°34′57.9″ N, 073°56′00.5″ W; thence to the point of origin.
(7) Sheepshead Bay, South. All waters bound by the following points: 40°34′54.2″ N, 073°56′01.8″ W; thence to 40°34′53.6″ N, 073°56′27.2″ W; thence to 40°34′55.8″ N, 073°56′43.6″ W; thence to 40°34′54.5″ N, 073°56′43.6″ W; thence to 40°34′52.0″ N, 073°56′34.0″ W; thence to 40°34′53.1″ N, 073°56′01.6″ W; thence to the point of origin.
(8) Lower Bay, Point Comfort. All waters bound by the following points: 40°27′18.5″ N, 074°08′24.5″ W; thence to 40°27′37.4″ N, 074°08′51.8″ W; thence to 40°27′51.4″ N, 074°08′31.9″ W; thence to 40°27′49.7″ N, 074°07′44.9″ W; thence to 40°27′15.3″ N, 074°07′45.7″ W; thence along the shoreline to the point of origin.
(9) Perth Amboy, NJ. All waters bound by the following points: 40°30′26.00″ N, 074°15′42.00″ W; thence to 40°30′24.29″ N, 074°15′35.20″ W; thence to 40°30′02.79″ N, 074°15′44.16″ W; thence to 40°29′35.70″ N, 074°16′08.88″ W; thence to 40°29′31.00″ N, 074°16′20.75″ W; thence to 40°29′47.26″ N, 074°16′49.82″ W; thence to 40°30′02.00″ N, 074°16′41.00″ W, thence along the shoreline to the point of origin.
(e) Datum. All positions are NAD 1983.
[USCG-2008-0179, 73 FR 35010, June 19, 2008, as amended by USCG-2008-0047, 74 FR 46010, Sept. 8, 2009; USCG-2010-0351, 75 FR 36282, June 25, 2010; USCG-2011-0563, 78 FR 51064, Aug. 20, 2013; USCG-2015-0038, 81 FR 18496, Mar. 31, 2016; USCG-2019-0952, 88 FR 16188, Mar. 16, 2023]
§ 110.67 Delaware River, Essington, Pa.
North of Little Tinicum Island, between the mouth of Darby Creek and Jansen Avenue, Essington, bounded as follows: Beginning at a point (approximately latitude 39°51′31″, longitude 75°17′43″) on a line in prolongation of the westerly line of Jansen Avenue 135 yards southerly from the mean high water line; thence 184°, 300 yards; thence 274°30′, 1,700 yards; thence 04°, 425 yards; thence 100°, 1,225 yards; and thence 95°, 490 yards, to the point of beginning.
§ 110.70a Northeast River, North East, Md.
The water area west of North East Heights, Maryland enclosed by a line beginning on the shoreline at latitude 39°34′26″ N., longitude 75°57′18″ W.; thence westerly to latitude 39°34′26″ N., longitude 75°57′29″ W.; thence northeasterly to latitude 39°34′30″ N., longitude 75°57′27″ W.; thence easterly to the shoreline at latitude 39°34′30″ N., longitude 75°57′18″ W.; thence southerly following the shoreline to the point of beginning.
[CGD 73-189R, 39 FR 5314, Feb. 12, 1974]
§ 110.71 Jacobs Nose Cove, Elk River, Md.
The water area of Jacobs Nose Cove, on the west side of the mouth of Elk River, Maryland, comprising the entire cove south of Jacobs Nose as defined by the shoreline and a line bearing 046°—226° true across the entrance of the cove tangent to the shore on both the north and south sides.
[CGD 77-143, 44 FR 18663, Mar. 29, 1979]
§ 110.71a [Reserved]
§ 110.71b Wye River, Wye, Md.
The waters of a cove on the western shore of Wye River opposite Drum Point enclosed by a line drawn from latitude 38°53′17″ N., longitude 76°11′23″ W., to latitude 38°53′18″ N., longitude 76°11′23″ W., to latitude 38°53′18″ N., longitude 76°11′13″ W.; thence following the shoreline to the point of beginning.
[CGD 78-026, 44 FR 6910, Feb. 5, 1979]
§ 110.72 Blackhole Creek, Md.
The waters on the west side of Blackhole Creek, a tributary of Magothy River, southwest of a line bearing 310°30′ from the most northerly tip of an unnamed island located 0.16 mile upstream from the mouth of the creek approximately 660 feet to the west shore of the creek; northwest of a line ranging from the southwesterly tip of the island toward the point of land on the west shore of the creek immediately southwest thereof; and north of a line 100 feet from and parallel to the shore of the creek to its intersection with the south property line extended of the Potapskut Sailing Association, Inc., thence northwesterly along the said property line extended to the shore.
§ 110.72a Chester River, southeast of Chestertown, Md.
The waters of the Chester River enclosed by a line beginning at a point on the Rolph Marina pier at latitude 39°10′25″ N., longitude 76°02′17″ W.; thence 327° to a point 400 feet southwest of the entrance to Hambleton Creek at latitude 39°10′55″ N., longitude 76°02′40″ W.; thence northeasterly to the eastern side of the entrance to Hambleton Creek; thence southerly following the shoreline to the Rolph Point Marina pier; thence southwesterly along the Rolph Point Marina pier to the point of beginning.
[CGD 73-10R, 38 FR 33973, Dec. 10, 1973]
§ 110.72aa Elizabeth River Spectator Vessel Anchorage Areas, between Norfolk and Portsmouth, Virginia.
(a) Special Anchorage Areas. (1) The waters of the Elizabeth River bounded by the shore and a line drawn between Hospital Point at latitude Latitude 36°50′50.5″ North, longitude 76°18′09.0″ West, and the tip of the channelside pier at the Holiday Inn Marina at latitude 36°50′29.5″ North, longitude 76°17′52.5″ West.
(2) The waters of the Elizabeth River adjacent to the Port Norfolk Reach section of the Elizabeth River, bounded by the shore and a line drawn between Hospital Point at latitude 36°50′50.55″ North, longitude 76°18′14.509.0″ West, and the tip of the southern most railroad pier at Port Norfolk at latitude 36°51′14.5″ North, longitude 76°18′44.0″ West.
(b) Effective period. These special anchorage areas in paragraph (a) of this section are only in effect when the regulations in § 100.501 of this title are in effect.
[CGD05-88-12, 53 FR 20320, June 3, 1988]
§ 110.72b St. Simons Island, Georgia.
The area beginning at a point southwest of Frederica River Bridge, St. Simons Island Causeway at latitude 31°09′58″ N., longitude 81°24′55″ W.; thence southwesterly to latitude 31°09′42″ N., longitude 81°25′10″ W.; thence westerly to the shoreline at latitude 31°09′45″ N., longitude 81°25′20″ W.; thence northeasterly along the shoreline to latitude 31°10′02″ N., longitude 81°25′00″ W.; thence southeasterly to the point of origin.
[CGD 76-47, 42 FR 40694, Aug. 11, 1977]
§ 110.72c Lake Murray, S.C.
(a) The area beginning at the 125 foot pier of the Columbia Sailing Club, approximately latitude 34°03′51″ N., longitude 81°13′37″ W.; thence 167° to latitude 34°03′43.6″ N., longitude 81°13′39.2″ W.; thence easterly to latitude 34°03′45″ N., longitude 81°13′32.1″ W.; thence 347° to the shoreline, thence along the shoreline to the beginning.
[CGD 77-189, 43 FR 14470, Apr. 6, 1978]
§ 110.72d Ashley River, SC.
All waters on the southwest portion of the Ashley River encompassed within the following points: Beginning at latitude 32°46′40″ N, longitude 79°57′27″ W; thence continuing north-northeasterly to latitude 32°46′44″ N, longitude 79°57′25″ W; thence continuing southeasterly to latitude 32°46′40″ N, longitude 79°57′22″ W; thence continuing southeasterly to latitude 32°46′27″ N, longitude 79°57′03″ W; thence continuing west-southwesterly to latitude 32°46′25″ N, longitude 79°57′09″ W; thence continuing northwesterly to the beginning point at latitude 32°46′40″ N, longitude 79°57′27″ W. All coordinates are North American Datum 1983.
[USCG-2013-0819, 79 FR 62570, Oct. 20, 2014]
§ 110.73 St. Johns River, Fla.
(a) Area A. The waters lying within an area bounded by a line beginning at a point located at the west bank of St. Johns River at latitude 30°15′11″, longitude 81°41′23″; thence to latitude 30°15′13″, longitude 81°41′14″; thence to latitude 30°15′03″, longitude 81°41′11″; thence to latitude 30°15′04″, longitude 81°41′20″; and thence to the point of beginning.
(b) Area B. The waters lying within an area bounded by a line beginning at latitude 30°15′03″, longitude 81°41′28″; thence to latitude 30°15′02″, longitude 81°41′10″; thence to latitude 30°14′56″, longitude 81°41′08″; thence to latitude 30°14′54.5″, longitude 81°41′10.5″; and thence to the point of beginning.
§ 110.73a Indian River at Sebastian, Fla.
Beginning at a point on the shoreline at latitude 27°49′40″ N., longitude 80°28′26″ W.; thence 060° to latitude 27°49′46″ N., longitude 80°28′13″ W.; thence 156° to latitude 27°49′31″ N., longitude 80°28′05″ W.; thence 242° to latitude 27°49′25″ N., longitude 80°28′18″ W.; thence northerly along the shoreline to the point of beginning.
Note:
This area is principally for use by commercial fishing vessels less than 65 feet in length.
[CGD 74-104, 40 FR 2689, Jan. 15, 1975]
§ 110.73b Indian River at Vero Beach, Fla.
(a) Area A. Beginning at a point located on the eastern shore of Fritz Is. at latitude 27°39′32.5″ N., longitude 80°22′20.6″ W. following the shoreline northward to the northwest point at latitude 27°39′46″ N., longitude 80°22′25.9″ W., thence due east to a point on Orchid Is. at approximately latitude 27°39′46″ N., longitude 80°22′16.2″ W., thence southerly along the shoreline of Orchid Is. to latitude 27°39′32.5″ N., longitude 80°22′13.4″ W., thence due west to the point of beginning.
(b) Area B. Beginning at a point located at the entrance channel marker No. 2 at latitude 27°39′12″ N., longitude 80°22′17.3″ W., thence northeasterly to channel marker No. 4 at latitude 27°39′21″ N., longitude 80°22′15.8″ W., thence due east to Orchid Is. at approximately latitude 27°39′21″ N., longitude 80°22′11.8″ W., thence southerly along the western shoreline of Orchid Is. to latitude 27°39′12″ N., longitude 80°22′15.6″ W., thence due west to the point of beginning.
(c) Vessels shall be so anchored so that no part of the vessel obstructs the turning basin or channels adjacent to the special anchorage areas.
[CGD7-84-40, 51 FR 395, Jan. 6, 1986]
§ 110.73c Okeechobee Waterway, St. Lucie River, Stuart, FL.
The following is a special anchorage area: Beginning on the Okeechobee Intracoastal Waterway between mile marker 7 and 8 on the St. Lucie River, bounded by a line beginning at 27°12′06.583″ N, 80°15′33.447″ W; thence to 27°12′07.811″ N, 80°15′38.861″ W; thence to 27°12′04.584″ N, 80°15′41.437″ W; thence to 27°11′49.005″ N, 80°15′44.796″ W; thence to 27°11′47.99″ N, 80°15′44.78″ W; thence to 27°11′42.51″ N, 80°15′49.36″ W; thence to 27°11′41.40″ N, 80°15′47.70″ W; thence to 27°11′40.44″ N, 80°15′44.64″ W; thence to 27°11′43.49″ N, 80°15′40.74″ W; thence to 27°11′46.82″ N, 80°15′37.9647″ W; thence to 27°11′47.881″ N, 80°15′38.271″ W; thence back to the original point. All coordinates reference Datum NAD:83.
Note:
This area is principally used by recreational vessels. The mooring of vessels in this area is administered by the local Harbormaster, City of Stuart, Florida.
[CGD07-99-058, 65 FR 2877, Jan. 19, 2000, as amended by CGD07-03-110, 69 FR 5275, Feb. 4, 2004]
§ 110.74 Marco Island, Marco River, Fla.
Beginning at a point approximately 300 feet east of the Captains Landing Docks at latitude 25°58′04″ N., longitude 81°43′31″ W.; thence 108°, 450 feet; thence 198°, 900 feet; thence 288°, 450 feet; thence 018°, 900 feet to the point of beginning.
Note:
The area is principally for use by yachts and other recreational craft. Fore and aft moorings will be allowed. Temporary floats or buoys for marking anchors in place will be allowed. Fixed mooring piles or stakes are prohibited. All moorings shall be so placed that no vessel, when anchored, shall at any time extend beyond the limits of the area.
[CGFR 70-53A, 35 FR 14506, Sept. 16, 1970]
§ 110.74a Manatee River, Bradenton, Fla.
The waters of the Manatee River enclosed by a line beginning at latitude 27°31′18.6″ N. longitude 82°36′49.2″ W.; thence westerly to latitude 27°31′21″ N., longitude 82°37′7.2″ W.; thence northwesterly to latitude 27°31′22.2″ N., longitude 82°37′8.4″ W.; thence northeasterly to latitude 27°31′25.8″ N., longitude 82°37′00″ W.; thence easterly to latitude 27°31′24″ N., longitude 82°36′44.4″ W.; thence to the point of beginning.
[CGD 79-118, 45 FR 32673, May 19, 1980]
§ 110.74b Apollo Beach, Fla.
Beginning at a point approximately 300 feet south of the Tampa Sailing Squadron at latitude 27°46′50.2″ N., longitude 82°25′27.8″ W.; thence southeasterly to latitude 27°46′45.6″ N., longitude 82°25′23.2″ W.; thence southwesterly to latitude 27°46′35.8″ N., longitude 82°25′34.8″ W., thence northwesterly to latitude 27°46′39.9″ N., longitude 82°25′39.6″ W., thence to the point of beginning.
[CGD 7-80-03, 45 FR 79031, Nov. 28, 1980]
§ 110.74c Bahia de San Juan, PR.
The waters of San Antonio Channel, Bahia de San Juan, eastward of longitude 66°05′45″ W.
[CGD 7-83-29, 49 FR 48540, Dec. 13, 1984]
§ 110.75 Corpus Christi Bay, Tex.
(a) South area. Southward of the southernmost T-head pier at the foot of Cooper Avenue and of a line bearing 156°44′, 340.6 feet, from the southerly corner of said pier to a point on the rubble breakwater; westward and northward of said breakwater; and eastward of the Corpus Christi sea wall.
§ 110.77 Amistad Reservoir, Tex.
(a) Diablo East, Tex. That portion of the Amistad Reservoir enclosed by a line connecting the following points, excluding a 300-foot-wide fairway extending northerly from the launching ramp as established by the Superintendent of Amistad Recreation Area:
Latitude | Longitude
“a” 29°28′54″ N. | 101°01′10″ W.
“b” 29°28′21″ N. | 101°01′08″ W.
“c” 29°28′34″ N. | 101°00′32″ W.
“d” 29°28′54″ N. | 101°00′32″ W.
(b) Rough Canyon, Tex. That portion of the Amistad Reservoir enclosed by a line connecting the following points, excluding a 300-foot-wide fairway extending westerly from the launching ramp to the Devils River main channel as established by the Superintendent of Amistad Recreation Area:
Latitude | Longitude
“a” 29°34′43″ N. | 100°58′54″ W.
“b” 29°34′05″ N. | 100°58′46″ W.
“c” 29°34′16″ N. | 100°58′20″ W.
“d” 29°34′27″ N. | 100°58′11″ W.
“e” 29°34′27″ N. | 100°58′36″ W.
“f” 29°34′52″ N. | 100°58′35″ W.
(c) Laughlin Air Force Base Site, Tex. That portion of Amistad Reservoir enclosed by a line connecting the following points:
Latitude | Longitude
“a” 29°28′29″ N. | 101°02′26″ W.
“b” 29°28′13″ N. | 101°02′03″ W.
“c” 29°28′30″ N. | 101°01′45″ W.
“d” 29°28′42″ N. | 101°02′00″ W.
Note:
The areas will be principally for use by yachts and other recreational craft. The anchoring of vessels and the placing of temporary moorings will be under the jurisdiction and at the discretion of the Superintendent, Amistad Recreation Area.
[CGFR 70-12, 35 FR 3807, Feb. 27, 1970]
§ 110.77a Duluth-Superior Harbor, Duluth, Minn.
The area adjacent to Park Point in Duluth-Superior Harbor within the following boundaries: beginning at latitude 46°45′19.3″ N., longitude 92°04′43″ W.; thence to latitude 46°45′11.7″ N., longitude 92°05′01″ W.; thence to latitude 46°44′21.2″ N., longitude 92°04′15.7″ W.; thence to latitude 46°44′29.4″ N., longitude 92°03′57.5″ W.; thence to the point of beginning.
[CGD 79-170, 45 FR 32673, May 19, 1980]
§ 110.77b Madeline Island, Wisconsin.
The waters off of La Pointe Harbor, Madeline Island, Wisconsin, encompassed by the following: starting at 46°46′44.8″ N, 090°47′14.0″ W; then south southwesterly to 46°46′35.5″ N, 090°47′17.0″ W; then south southeasterly to 46°46′27″ N, 090°47′12.8″ W; then east southeasterly to 46°46′22.6″ N, 090°46′58.8″ W; then following the shoreline back to the starting point (NAD 83).
[CGD09-03-284, 69 FR 32445, June 10, 2004]
§ 110.78 Sturgeon Bay, Sturgeon Bay, Wis.
(a) Area 1. Beginning at a point bearing 126°, 3,000 feet from the fixed green Sturgeon Bay Canal Leading Light mounted on the highway bridge; thence 120°, 1,200 feet, this line being parallel to and 150 feet from the channel edge; thence 222°, 500 feet; thence 300°, 1,200 feet; thence 042°, 500 feet to the point of beginning.
(b) Area 2. Beginning at a point 160 feet from the shoreline and on the east line of 15th Avenue extended; thence south 530 feet to a point 100 feet from the northern edge of the channel; thence southeasterly 2,350 feet along a line parallel to the northern edge of the channel to a point on the east line of 18th Avenue extended, using that portion of 18th Avenue that runs in a true north-south direction perpendicular to Utah Street; thence north 530 feet along this line of 18th Avenue extended to a point approximately 400 feet from the shoreline; thence northwesterly 2,350 feet along a line parallel to the northern edge of the channel to the point of beginning.
Note:
An ordinance of the City of Sturgeon Bay, Wisconsin, requires moorings to be approved by the Harbor Master of the City of Sturgeon Bay and provides for other regulation of the use of vessels and moorings in this area.
[CGFR 70-15A, 35 FR 8823, June 6, 1970, as amended by CGFR 70-86A, 35 FR 18374, Dec. 3, 1970; CGD9 92-29, 58 FR 9543, Feb. 22, 1993]
§ 110.79a Neenah Harbor, Neenah, Wis.
(a) Area 1. The area of Neenah Harbor south of the main shipping channel within the following boundary: A line beginning at a point bearing 117.5°, 1,050 feet from the point where the southeasterly side of the First Street/Oak Street Bridge crosses the south shoreline of the river; thence 254°, 162 feet; thence 146°, 462 feet; 164°, 138 feet; 123°, 367 feet; 068°, 400 feet; 044°, 400 feet; thence 320°, 107 feet; thence 283°, 1,054 feet to the point of beginning.
(b) Area 2. Commencing at a point where the west line of Second Street extended meets the north edge of the harbor, thence south to intersect the north edge of the channel at latitude 44°11′04.2″ North, longitude 88°27′13.2″ West, thence northwesterly to a point at latitude 44°11′06.3″ North, longitude 88°27′16.4″ West, thence north to the easterly end of the Neenah Dam Spillway.
Note:
An ordinance of the City of Neenah, Wis., requires approval of the Neenah Police Department for the location and type of individual moorings placed in this special anchorage area.
[CGD9 85-017, 50 FR 49844, Dec. 5, 1985]
§ 110.79b Millers Bay, Lake Winnebago, Oshkosh, WI.
The area adjacent to Menominee Park in Millers Bay within the following boundaries: beginning at latitude 44°01′47″ N., longitude 88°31′05″ W.; thence to latitude 44°01′46″ N., longitude 88°31′00″ W.; thence to latitude 44°01′34″ N., longitude 88°31′04″ W.; thence to latitude 44°01′36″ N., longitude 88°31′08″ W.; thence to point of beginning.
[CGD 09-80-01, 47 FR 18333, Apr. 29, 1982]
§ 110.79c Fish Creek Harbor, Fish Creek, Wisconsin.
The area within the following boundaries: Beginning at latitude 45°07′52″ N., longitude 87°14′42″ W.; thence to latitude 45°07′53″ N., longitude 87°14′37″ W.; thence to latitude 45°07′47″ N., longitude 87°14′30″ W.; thence to latitude 45°07′42″ N., longitude 87°14′37″ W.; thence to latitude 45°07′44″ N., longitude 87°14′40″ W.; thence to latitude 45°07′48″ N., longitude 87°14′38″ W.; thence to the point of beginning.
Note 1 to § 110.79c:
An ordinance of the Town of Gibraltar, WI, requires moorings to be approved by the Harbor Commission of the Town of Gibraltar and provides for other regulation of the use of vessels and moorings in this area.
[USCG-2016-0498, 82 FR 35080, July 28, 2017]
§ 110.80 Milwaukee Harbor, Milwaukee, Wis.
(a) McKinley Park. The water area east of McKinley Park enclosed by a line beginning at McKinley Park Jetty Light; thence 090°, 500 feet to a point on the breakwater; thence northerly and northwesterly following the breakwater, piers, jetty and natural shoreline to the point of beginning.
(b) South Shore Park. The water area northeast of South Shore Park enclosed by a line beginning at the northeast corner of the jetty at latitude 43°00′07.5″ N., longitude 87°53′08″ W.; thence to latitude 43°00′05″ N., longitude 87°53′01″ W.; thence to latitude 42°59′55″ N., longitude 87°52′53″ W.; thence to latitude 42°59′40″ N., longitude 87°52′33.5″ W.; thence to a point of the shoreline at latitude 42°59′34″ N., longitude 87°52′43.5″ W.; thence following the shoreline to the point of beginning.
(c) Bay View Park. The water area east of Bay View Park enclosed by a line beginning on the shoreline at latitude 42°59′28.5″ N., longitude 87°52′35″ W.; thence to latitude 42°59′35.5″ N., longitude 87°52′27″ W.; thence to latitude 42°59′08″ N., longitude 87°51′37″ W.; thence to a point on the shoreline at latitude 42°58′59″ N., longitude 87°51′46″ W.; thence following the shoreline to the point of beginning.
Note:
An ordinance of the City of Milwaukee, Wisconsin requires the approval of the Milwaukee Harbor Master for the location and type of moorings placed in these special anchorage areas.
[CGD 73-48R, 39 FR 12007, Apr. 2, 1974]
§ 110.80a Lake Macatawa, Mich.
An area located on the south side of Lake Macatawa near the entrance to Lake Michigan, shoreward (south) of a line commencing offshore of Macatawa Park at a point 960 feet S 156° E from the light on the south pier at the entrance to the Lake, and extending 1,550 feet N 82° E toward the northwest corner of the Macatawa Bay Yacht Club pier.
§ 110.80b Marquette Harbor, Marquette, Mich.
The area within Marquette Harbor beginning at latitude 46°32′38″ N., longitude 87°22′46″ W.; thence to latitude 46°32′37″ N., longitude 87°22′54″ W.; thence to latitude 46°32′33″ N., longitude 87°22′54″ W.; thence to latitude 46°32′33″ N., longitude 87°22′46″ W., thence to point of origin.
Note:
An ordinance of the City of Marquette authorizes the Harbormaster to direct the location and length of time any watercraft may anchor in this area.
[CGD 79-018, 44 FR 50040, Aug. 27, 1979]
§ 110.81 Muskegon Lake, Mich.
(a) Muskegon Lake West. The waters of the southwest side of Muskegon Lake enclosed by a line beginning at latitude 43°13′24″ N., longitude 86°19′18.5″ W.; thence 145°T to latitude 43°13′07.5″ N., longitude 86°19′02.5″ W.; thence 230°T to latitude 43°13′04″ N., longitude 86°19′08.5″ W.; thence along the shoreline to the point of origin.
(b) Muskegon Lake East. The waters of the southeast side of Muskegon Lake enclosed by a line beginning at latitude 43°14′04″ N., longitude 86°15′47″ W.; thence 277°T to latitude 43°14′06.5″ N., longitude 86°16′27″ W.; thence 205°T to the shore; thence along the shoreline to the point of origin.
Note:
Administration of the Special Anchorage Area is exercised by the City of Muskegon pursuant to local ordinances.
[CGD 79-171, 46 FR 48195, Oct. 1, 1981]
§ 110.81a Lake Betsie, Frankfort, MI.
The area within the following boundaries:
Beginning at latitude 44°37′47″ North, longitude 86°13′52.5″ West; thence to latitude 44°37′51.4″ North, longitude 86°13′49″ West; thence to latitude 44°37′46.4″ North, longitude 86°13′37.8″ West; then to latitude 44°37′44.8″ North, longitude 86°13′44.2″ West; thence to point of beginning.
[CGD 09-82-06, 48 FR 33263, July 21, 1983]
§ 110.82 Charlevoix Harbor, Mich.
The waters on the north side of Round Lake northward of a line beginning at a point approximately 200 feet south of the north shore bearing 60°, 280 feet, from the northeast corner of the Charlevoix Municipal Wharf, and bearing thence 92°, 400 feet, thence 129°, 1,160 feet, and thence 110° to the westerly end of the southwest side of Park Island.
§ 110.82a Little Traverse Bay, Lake Michigan, Harbor Springs, Mich.
(a) Area 1. Beginning at latitude 45°25′42.2″ N., Longitude 84°59′7.5″ W.; thence to latitude 45°25′39.5″ N., longitude 84°59′09″ W.; thence to latitude 45°25′35″ N., longitude 84°59′07″ W.; thence to latitude 45°25′35″ N., longitude 84°58′55.2″ W.; thence to latitude 45°25′42.2″ N., longitude 84°58′56.5″ W., thence to the point of beginning.
(b) Area 2. Beginning at latitude 45°25′42.2″ N., longitude 84°58′54″ W.; thence to latitude 45°25′35″ N., longitude 84°58′53″ W.; thence to latitude 45°25′35″ N., longitude 84°58′24.8″ W.; thence to latitude 45°25′36.1″ N., longitude 84°58′23″ W.; thence to latitude 45°25′42.2″ N., longitude 84°58′39″ W., thence to the point of beginning.
[CGD 09-85-02, 50 FR 24194, June 10, 1985]
§ 110.83 Chicago Harbor, Ill.
(a) Grant Park North-A. Beginning at a point 2,120 feet South of the intersection of the North line of the Chicago Yacht Club bulkhead, as constructed in 1927, and the harbor line approved by the Department of the Army on August 3, 1940, along the West side of the harbor, said harbor line runs parallel to the overall alignment of said Grant Park bulkhead between its North and South ends, said intersection is approximately 800 feet South of the South face of the former Naval Armory Dock, and 100 feet East of said bulkhead, that point being approximately on the harbor line; thence North along a straight line parallel to said harbor line and bulkhead, 1,705 feet to a point that is 100 feet East of said harbor line and 150 feet East of the Grant Park bulkhead; thence East at a right angle, 150 feet; thence North at a right angle, parallel to the first described line, passing 100 feet East of the Chicago Yacht Club bulkhead, 440 feet; thence Northeasterly 850 feet to a point 1,070 feet East of the aforesaid Grant Park bulkhead; thence Southeasterly 740 feet to a point 1,600 feet East of said harbor line; thence Southerly 1,960 feet to a point approximately 1,555 feet East of said harbor line and about 1,560 feet East of said Grant Park bulkhead; thence Southwesterly 295 feet to a point 1,180 feet due East, in a direction perpendicular to the West line hereof, from the point of beginning; and thence West to the point of beginning.
(b) Grant Park North-B. Beginning at a point 145 feet North of the North line of the Chicago Yacht Club bulkhead, as constructed in 1927, and 320 feet East of the harbor line approved by the Department of the Army on August 3, 1940, along the West side of the harbor, said Chicago Yacht Club bulkhead extends due East, perpendicular to the Grant Park bulkhead's overall alignment between its North and South ends, said bulkhead runs parallel to the aforesaid harbor line and is approximately 800 feet South of the South face of the former Naval Armory Dock, said point is 20 feet East of the East face of the Chicago Park District jetty; thence North parallel to said jetty, 230 feet to a point 20 feet South of the South face of the Lake Shore Drive bulkhead, said bulkhead runs Easterly and Westerly in a curved direction; thence Easterly along a line parallel to said curved bulkhead to a point 20 feet Southwest and perpendicular to a line extended along the Southwest side of the Columbia Yacht Club pier to said curved bulkhead; thence Southeasterly parallel to said extended line, 160 feet; thence Southwesterly to the point of beginning.
(c) Grant Park North-C. Beginning at a point 970 feet North of the North line of the Chicago Yacht Club bulkhead, as constructed in 1927, which extends due East and perpendicular from the harbor line approved by the Department of the Army on August 3, 1940, said Chicago Yacht Club bulkhead line is approximately 800 feet South of the South face of the former Naval Armory Dock, and 1,170 feet East of said harbor line, said point of beginning is 20 feet East of the East face of the Columbia Yacht Club pier and 20 feet South of the South face of a breakwater, which runs in a East and West direction; thence East along a line parallel to the South face of said East-West breakwater, 540 feet to a point 20 feet West of the West face of a breakwater, which runs in a North and South direction; thence South along a line parallel to the West face of said North-South breakwater, approximately 965 feet; thence Northwesterly to a point 20 feet Southeast and perpendicular to the Southeast side of the aforesaid Columbia Yacht Club pier; thence Northerly along a line parallel to the East face of said pier to the point of beginning.
(d) Grant Park South. Beginning at a point 2,220 feet South of the intersection of the North line of the Chicago Yacht Club bulkhead, as constructed in 1927, and the harbor line approved by the Department of the Army on August 3, 1940, along the West side of the harbor, said harbor line runs parallel to the overall alignment of the Grant Park bulkhead between its North and South ends, said intersection is approximately 800 feet South of the South face of the former Naval Armory Dock, and 100 feet East of said Grant Park bulkhead, that point being approximately on the harbor line; thence East, perpendicular to the overall alignment of the Grant Park bulkhead, and perpendicular to said harbor line, 1,180 feet; thence Southeasterly 330 feet to a point 1,510 feet East of said Grant Park bulkhead and 225 feet South of an extension of the first described line; thence South perpendicular to the first described line, 220 feet; thence Southwesterly 2,375 feet along a line generally 100 feet Northwesterly from and parallel to the Northwesterly face of the narrow section of the U.S. Inner Breakwater; thence Northwesterly 100 feet to a point 150 feet East of said Grant Park bulkhead (or 100 feet East of the aforesaid harbor line), and 4,570 feet South of the North line of the aforesaid Chicago Yacht Club bulkhead; and thence North 2,350 feet of the point of beginning.
Note:
The Chicago Park District controls the location and type of any moorings placed in the special anchorage areas in this section.
[CGD09-83-02, 50 FR 27581, July 5, 1985]
§ 110.83a Cedar Point, Sandusky, Ohio.
The water area enclosed by the break wall beginning at latitude 41°28′13″ N., longitude 82°40′39″ W.; thence along the break wall to latitude 41°28′21″ N., longitude 82°40′53″ W.; thence along a straight line southwesterly to latitude 41°28′20″ N., longitude 82°40′55″ W.; thence along the break wall to latitude 41°28′33″ N., longitude 82°40′58″ W.; thence along the shoreline to the point of beginning.
[CGD 79-169, 45 FR 32674, May 19, 1980]
§ 110.84 Black Rock Channel opposite foot of Porter Avenue, Buffalo, N.Y.
An area extending northwesterly between Black Rock Channel and Bird Island Pier opposite the foot of Porter Avenue, bounded as follows: Beginning at Triangulation Marker “N-5” on Bird Island Pier; thence southeasterly along the pier a distance of approximately 745 feet; thence 60°52′ true, approximately 300 feet to a point 50 feet westerly of the westerly limit of Black Rock Channel; thence northwesterly along an arc of a circle parallel to and 50 feet westerly of the westerly limit of the channel to a point approximately 360 feet southerly of Bird Island Pier Light No. 17; thence 276°20′ true, approximately 135 feet to Bird Island Pier; thence southwesterly and southerly along the pier a distance of approximately 1,355 feet to the point of beginning.
§ 110.84b Buffalo, N.Y.
The area within the Port of Buffalo known as Port of Buffalo Small Boat Harbor commencing at a point on shore at latitude 42°51′05″ N., longitude 78°51′55″ W.; thence 240° to rip-rap dike thence following the dike to the shoreline; thence along the shoreline to the point of origin.
[CGD 77-47, 43 FR 35480, Aug. 10, 1978; 43 FR 56040, Nov. 30, 1978]
§ 110.85 Niagara River, Youngstown, N.Y.
(a) Area 1. Beginning at a point at the intersection of the south line of Swain Street extended with the east shoreline of the Niagara River at latitude 43°14′33″ N, longitude 79°03′7.5″ W; thence westerly to a point at latitude 43°14′33″ N, longitude 79°03′9.5″ W; thence Southerly to a point at latitude 43°14′15.5″ N, longitude 79°03′10″ W; thence Westerly to a point at latitude 43°14′15.5″ N, longitude 79°03′17″ W; thence northerly to a point at latitude 43°14′54.5″ N, longitude 79°03′14″ W; thence southeasterly to a point at latitude 43°14′52.3″ N, longitude 73°03′09″ W; thence southerly to a point at latitude 43°14′51.4″ N. longitude 73°03′09″ W; thence easterly to a point at latitude 43°14′51.5″ N; longitude 79°03′6.5″ W; thence along the shoreline to the point of beginning.
(b) Area 2. Beginning at a point at latitude 43°14′53.2″ N., longitude 79°03′08″ W.; thence northwesterly to a point at latitude 43°14′56″ N., longitude 79°03′14″ W.; thence northerly to a point at latitude 43°15′07″ N., longitude 79°03′13″ W.; thence northwesterly to a point at latitude 43°15′9.5″ N., longitude 79°03′13.5″ W.; thence southeasterly to a point at latitude 43°15′7.5″ N., longitude 79°03′08″ W.; thence southerly to the point of beginning.
(c) Area 3. Beginning at a point at latitude 43°15′7.9″ N., longitude 79°03′03″ W.; thence westerly to a point at latitude 43°15′7.9″ N., longitude 79°03′04″ W.; thence northwesterly to a point at latitude 43°15′11.8″ N., longitude 79°03′14″ W.; thence northerly to a point at latitude 43°15′14″ N., longitude 79°03′14″ W.; thence northwesterly to a point at latitude 43°15′22″ N., longitude 79°03′21.5″ W.; thence northeasterly to a point at latitude 43°15′25.5″ N., longitude 79°03′13″ W.; thence along the shoreline to the point of beginning.
Note:
The Youngstown Harbor Commission controls the location, type, and assignment of moorings placed in the special anchorage areas in this section.
[CGD 79-098, 45 FR 32674, May 19, 1980, as amended by CGD9-85-10, 50 FR 43387, Oct. 25, 1985]
§ 110.86 Sodus Bay, NY.
The water area in Sodus Bay, New York, south of Sand Point, two separate sections, enclosed by:
(a) Eastern Section, beginning at a point on the shoreline at:
Latitude | Longitude
43°15′58.1″ N | 076°58′34.0″ W, to
43°15′51.9″ N | 076°58′33.5″ W, to
43°15′53.5″ N | 076°58′47.5″ W, to
43°16′01.8″ N | 076°58′43.0″ W,
thence along the natural shoreline and structures to:
43°15′58.1″ N | 076°58′34.0″ W.
(b) Western Section, beginning at a point on the shoreline at:
Latitude | Longitude
43°16′02.5″ N | 076°58′45.0″ W, to
43°15′54.0″ N | 076°58′50.0″ W, to
43°15′54.8″ N | 076°59′00.1″ W, to
43°16′07.0″ N | 076°59′47.0″ W,
thence along the natural shoreline and structures to:
43°16′02.5″ N | 076°58′45.0″ W.
[CGD 09-93-029, 58 FR 40740, July 30, 1993]
§ 110.87 Henderson Harbor, N.Y.
(a) Area A. The area in the southern portion of Henderson Harbor west of the Henderson Harbor Yacht Club bounded by a line beginning at latitude 43°51′08.8″ N, longitude 76°12′08.9″ W, thence to latitude 43°51′09.0″ N, longitude 76°12′19.0″ W, thence to latitude 43°51′33.4″ N, longitude 76°12′19.0″ W, thence to latitude 43°51′33.4″ N, longitude 76°12′09.6″ W, thence to the point of beginning. All nautical positions are based on North American Datum of 1983.
(b) Area B. The area in the southern portion of Henderson Harbor north of Graham Creek Entrance Light bounded by a line beginning at latitude 43°51′21.8″ N, longitude 76°11′58.2″ W, thence to latitude 43°51′21.7″ N, longitude 76°12′05.5″ W, thence to latitude 43°51′33.4″ N, longitude 76°12′06.2″ W, thence to latitude 43°51′33.6″ N, longitude 76°12′00.8″ W, thence to the point of beginning. All nautical positions are based on North American Datum of 1983.
[CGD09-99-081, 65 FR 11893, Mar. 7, 2000, as amended by USCG-2009-0854, 74 FR 49815, Sept. 29, 2009]
§ 110.90 San Diego Harbor, Calif.
(a) Area A-1. In North San Diego Bay, the Shelter Island Yacht Basin Anchorage, the water area enclosed by a line beginning at latitude 32°42′56.7″ N., longitude 117°13′47.1″ W.; thence southwesterly to latitude 32°42′53.6″ N., longitude 117°13′51.3″ W.; thence northwesterly to latitude 32°43′01.3″ N., longitude 117°13′59.1″ W.; thence northeasterly to latitude 32°43′02.6″ N., longitude 117°13′55.5″ W.; thence southeasterly to latitude 32°42′59.8″ N., longitude 117°13′50.4″ W.; thence southeasterly to the point of beginning.
(b) Area A-1a. In North San Diego Bay, the Shelter Island Roadstead Anchorage east of Shelter Island, the water area 55 feet either side of a line beginning at latitude 32°42′33.6″ N., longitude 117°13′48.3″ W.; thence northeasterly to latitude 32°42′36.0″ N., longitude 117°13′45.1″ W.
(c) Area A-1b. The water area off Shelter Island's eastern shore, 210 feet shoreward of a line beginning at latitude 32°42′43.9″ N., longitude 117°13′34.3″ W.; thence northeasterly to latitude 32°42′52.8″ N., longitude 117°13′22.4″ W.
(d) Area A-1c. The water area off Shelter Island's eastern shore, 210 feet shoreward of a line beginning at latitude 32°42′55.0″ N., longitude 117°13′19.4″ W.; thence northeasterly to latitude 32°43′03.5″ N., longitude 117°13′07.6″ W.
(e) Area A-2. In North San Diego Bay, the America's Cup Harbor Anchorage, the water area enclosed by a line beginning at latitude 32°43′13.7″ N, longitude 117°13′23.8″ W; thence northeasterly to latitude 32°43′16.7″ N., longitude 117°13′16.4″ W.; thence northwesterly to latitude 32°43′22.6″ N., longitude 117°13′25.8″ W.; thence westerly to latitude 32°43′22.5″ N., longitude 117°13′29.6″ W.; thence southwesterly to latitude 32°43′19.0″ N., longitude 117°13′32.6″ W.; thence southeasterly to the point of beginning.
(f) Area A-3. In North San Diego Bay, the Laurel Street Roadstead Anchorage, the water area enclosed by a line beginning at latitude 32°43′30.5″ N., longitude 117°10′28.5″ W.; thence southwesterly to latitude 32°43′29.8″ N., longitude 117°10′34.2″ W.; thence southwesterly to latitude 32°43′25.8″ N., longitude 117°10′36.1″ W.; thence southerly to latitude 32°43′20.2″ N., longitude 117°10′36.1″ W.; thence westerly to latitude 32°43′20.2″ N., longitude 117°10′52.9″ W.; thence northeasterly to 32°43′29.8″ N., longitude 117°10′48.0″ W., thence northeasterly following a line parallel to, and 200 feet bayward of, the shoreline of San Diego Bay adjoining Harbor Drive to the point of beginning.
(g) Area A-4. In Central San Diego Bay, the Bay Bridge Roadstead Anchorage, the water area enclosed by a line beginning at latitude 32°41′32.1″ N., longitude 117°09′43.1″ W.; thence southwesterly to latitude 32°41′19.1″ N., longitude 117°09′46.1″ W.; thence southeasterly to latitude 32°41′17.8″ N., longitude 117°09′44.3″ W.; thence southeasterly to latitude 32°41′14.9″ N., longitude 117°09′37.9″ W.; thence northeasterly to latitude 32°41′26.9″ N., longitude 117°09′35.1″ W., thence southwesterly to the point of beginning.
(h) Area A-5. In Central San Diego Bay, the Glorietta Bay Anchorage, the water area enclosed by a line beginning at latitude 32°40′42.2″ N., longitude 117°10′03.1″ W.; thence southwesterly to latitude 32°40′41.2″ N., longitude 117°10′06.6″ W.; thence northwesterly to latitude 32°40′46.2″ N., longitude 117°10′15.6″ W.; thence northeasterly to latitude 32°40′46.7″ N., longitude 117°10′14.1″ W.; thence southeasterly to the point of beginning.
(i) Area A-6. In Fiddler's Cove, the water enclosed by a line beginning at latitude 32°39′10.4″ N., longitude 117°08′49.4″ W.; thence northwesterly to latitude 32°39′14.9″ N., longitude 117°08′51.8″ W.; thence northeasterly to latitude 32°39′17.6″ N., longitude 117°08′47.5″ W.; thence northwesterly to latitude 32°39′19.8″ N., longitude 117°08′48.8″ W.; thence northeasterly to latitude 32°39′24.4″ N., longitude 117°08′41.4″ W.; thence southeasterly to latitude 32°39′15.7″ N., longitude 117°08′36.0″ W.; thence southwesterly to the point of beginning.
Note:
This area is located on Federal property owned by the United States Navy, and it is reserved for active duty military, their dependents, retirees, and DOD employees only.
(j) Area A-8. In South San Diego Bay, the Sweetwater Anchorage, the water enclosed by a line beginning at latitude 32°39′12.2″ N., longitude 117°07′45.1″ W.; thence easterly to latitude 32°39′12.2″ N., longitude 117°07′30.1″ W.; thence southerly to latitude 32°38′45.2″ N., longitude 117°07′30.1″ W.; thence westerly to latitude 32°38′45.2″ N., longitude 117°07′45.1″ W.; thence northerly to the point of beginning.
(k) Area A-9. In North San Diego Bay, the Cruiser Anchorage, the water enclosed by a line beginning at latitude 32°43′35.9″ N., longitude 117°11′06.2″ W.; thence southwesterly to latitude 32°43′31.5″ N., longitude 117°11′13.2″ W.; thence southeasterly to latitude 32°43′28.9″ N., longitude 117°11′11.0″ W.; thence southeasterly to latitude 32°43′25.9″ N., longitude 117°11′07.7″ W.; thence northeasterly to latitude 32°43′34.8″ N., longitude 117°11′03.2″ W., thence northwesterly to the point of beginning. All coordinates in this section use Datum: NAD 83.
Note:
Mariners anchoring in these anchorages, excluding Anchorage A-6, should consult applicable local ordinances of the San Diego Unified Port District. Temporary floats or buoys for marking anchors are allowed. Fixed moorings, piles or stakes are prohibited. All moorings shall be positioned so that no vessel, when anchored, shall at any time extend beyond the limits of the area. See Captain of the Port Notice 6-97, a copy of which can be obtained by calling (619) 683-6495.
[CGD11-97-007, 63 FR 16688, Apr. 6, 1998]
§ 110.91 Mission Bay, Calif.
(a) Area M-1. In San Juan Cove, the entire water area west of a line drawn from latitude 32°46′53.6″ N., longitude 117°14′52.5″ W.; to El Carmel Point North Light; latitude 32°46′48.0″ N., longitude 117°14′50.1″ W.
Note:
Control over the anchoring of vessels and placing of temporary moorings in this area is exercised by the City of San Diego Park and Recreation Department pursuant to local ordinances.
(b) Area M-2. In Santa Barbara Cove, the entire water area west of a line drawn from latitude 32°46′40.0″ N., longitude 117°14′47.0″ W.; to latitude 32°46′33.5″ N., longitude 117°14′45.5″ W.
Note:
Control over the anchoring of vessels and the placing of temporary moorings in this area is exercised by the City of San Diego Park and Recreation Department pursuant to local ordinances.
(c) Area M-3. In Mariners Basin, the entire water area west of a line drawn from latitude 32°45′49.2″ N., longitude 117°14′42.9″ W.; to Mission Point Light; latitude 32°45′43.7″ N., longitude 117°14′41.9″ W.
Note:
Control over the anchoring of vessels and the placing of temporary moorings in this area is exercised by the City of San Diego Park and Recreation Department pursuant to local ordinances.
(d) Area M-4. In Quivira Basin, the entire water area enclosed by that portion of a circle of 45 yard radius from latitude 32°45′42.8″ N., longitude 117°14′25.6″ W.; through the arc from 354° T to 088° T.
Note:
Control over the anchoring of vessels and the placing of temporary moorings in this area is exercised by the City of San Diego Park and Recreation Department pursuant to local ordinances.
[CGD11-85-02, 51 FR 2882, Jan. 22, 1986]
§ 110.93 Dana Point Harbor, Calif.
The area in Dana Point Harbor, Calif. commencing at a point at latitude 33°27′36.2″ N., longitude 117°42′20.4″ W.; thence 016°20′ True for 612 feet to a point at latitude 33°27′42.1″ N., longitude 117°42′18.4″ W.; thence 106°20′ True for 85 feet to a point at latitude 33°27′41.8″ N., longitude 117°42′17.7″ W.; thence 196°20′ True for 222 feet to a point at latitude 33°27′39.7″ N., longitude 117°42′18.2″ W.; thence 182°20′ True 234 feet to a point at latitude 33°27′37.4″ N., longitude 117°42′18.2″ W.; thence 166°20′ True for 499 feet to a point at latitude 33°27′32.6″ N., longitude 117°42′16.8″ W.; thence 320° True for 470 feet to the point of origin.
[CGD 76-197, 42 FR 44985, Sept. 8, 1977]
§ 110.95 Newport Bay Harbor, Calif.
(a) Area A-1. The entire water area within beginning at latitude 33°36′09.3″ N., longitude 117°53′52.6″ W.; thence to latitude 33°36′11.4″ N., longitude 117°53′51.2″ W.; thence to latitude 33°36′04.0″ N., longitude 117°53′33.4″ W.; thence to latitude 33°36′03.9″ N., longitude 117°53′20.4″ W.; thence to 33°36′01.1″ N., longitude 117°53′09.9″ W.; thence to 33°36′01.1″ N., longitude 117°53′32.7″ W.; thence to 33°36′03.9 N., longitude 117°53′41.9″ W.; returning to latitude 33°36′09.3″ N., longitude 117°53′52.6″ W.
(b) Area A-2. The entire water area within beginning at latitude 33°36′12.9″ N., longitude 117°53′44.2″ W; thence to latitude 33°36′14.2″ N., longitude 117°53′44.3″ W.; thence to latitude 33°36′14.2″ N., longitude 117°53′20.6″ W.; thence to latitude 33°36′10.8″ N., longitude 117°53′20.5″ W.; thence to latitude 33°36′12.7″ N., longitude 117°53′29.9″ W.; thence to latitude 33°36′12.7″ N., longitude 117°53′35.4″ W.; thence to latitude 33°36′12.9″ N., longitude 117°53′37.0″ W.; returning to latitude 33°36′12.9″ N., longitude 117°53′44.2″ W.
(c) Area A-3. The entire water area within beginning at latitude 33°36′22.7″ N., longitude 117 54′12.6″ W.; thence to latitude 33°36′24.9″ N., longitude 117°54′12.6″ W.; thence to latitude 33°36′26.2″ N., longitude 117°54′11.3″ W.; thence to latitude 33°36′18.7″ N., longitude 117°54′00.5″ W.; thence to latitude 33°36′16.2″ N., longitude 117°54′02.9″ W.; returning to latitude 33°36′22.7″ N., longitude 117°54′12.6″ W.
(d) Area A-4. The entire water area within beginning at latitude 33°36′32.7″ N., longitude 117°53′56.6″ W.; thence to latitude 33°36′33.6″ N., longitude 117°53′56.6″ W.; thence to latitude 33°36′33.5″ N., longitude 117°53′26.2″ W.; thence to latitude 33°36′32.9″ N., longitude 117°53′26.2″ W.; thence to latitude 33°36′32.6″ N., longitude 117°53′33.8″ W.; thence to latitude 33°36′32.4″ N., longitude 117°53′36.7″ W.; thence to latitude 33°36′31.7″ N., longitude 117°53′40.9″ W.; thence to 33°36′31.7″ N., longitude 117°53′46.3″ W.; thence to latitude 33°36′32.6″ N., longitude 117°53′50.9″ W.; returning to latitude 33°36′32.7″ N., longitude 117°53′56.6″ W.
(e) Area A-5. The entire water area within beginning at latitude 33°36′29.1″ N., longitude 117°54′55.3″ W.; thence to latitude 33°36′27.8″ N., longitude 117°54′55.8″ W.; thence to latitude 33°36′24.1″ N., longitude 117°54′41.8″ W.; thence to latitude 33°36′26.7″ N., longitude 117°54′40.8″ W.; thence to latitude 33°36′26.7″ N., longitude 117°54′46.3″ W.; returning to latitude 33°36′29.1″ N., longitude 117°54′55.3″ W.
(f) Area A-6. The entire water area within beginning at latitude 33°36′43.3″ N., longitude 117°54′26.4″ W.; thence to latitude 33°36′51.7″ N., longitude 117°54′22.8″ W.; thence to latitude 33°36′51.4″ N., longitude 117°54′21.5″ W.; thence to latitude 33°36′42.9″ N., longitude 117°54′25.2″ W.; returning to latitude 33°36′43.3″ N., longitude 117°54′26.4″ W.
(g) Area A-7. The entire water area within beginning at latitude 33°36′32.1″ N., longitude 117°55′12.5″ W.; thence to latitude 33°36′37.7″ N., longitude 117°55′11.0″ W.; thence to latitude 33°36′35.1″ N., longitude 117°55′01.3″ W.; thence to latitude 33°36′30.4″ N., longitude 117°55′02.6″ W.; thence to latitude 33°36′31.2″ N., longitude 117°55′06.7″ W.; returning to latitude 33°36′32.1″ N., longitude 117°55′12.5″ W.
(h) Area A-8. The entire water area within beginning at latitude 33°36′34.2″ N., longitude 117°55′27.3″ W.; thence to latitude 33°36′36.2″ N., longitude 117°55′26.7″ W.; thence to latitude 33°36′39.5″ N., longitude 117°55′20.9″ W.; thence to latitude 33°36′38.9″ N., longitude 117°55′15.4″ W.; thence to latitude 33°36′37.9″ N., longitude 117°55′11.7″ W.; thence to latitude 33°36′32.1″ N., longitude 117°55′13.3″ W.; returning to latitude 33°36′34.2″ N., longitude 117°55′27.3″ W.
(i) Area A-9. The entire water area within beginning at latitude 33°36′53.5″ N., longitude 117°55′28.2″ W.; thence to latitude 33°36′54.0″ N., longitude 117°55′27.0″ W.; thence to latitude 33°36′43.4″ N., longitude 117°55′20.4″ W.; thence to latitude 33°36′42.9″ N., longitude 117°55′21.6″ W.; returning to latitude 33°36′53.5″ N., longitude 117°55′28.2″ W.
(j) Area A-10. The entire water area within beginning at latitude 33°36′07.4″ N., longitude 117°53′19.2″ W.; thence to latitude 33°36′14.2″ N., longitude 117°53′19.4″ W.; thence to latitude 33°36′14.2″ N., longitude 117°53′06.9″ W.; thence to latitude 33°36′08.1″ N., longitude 117°53′04.9″ W.; thence to latitude 33°36′06.5″ N., longitude 117°53′08.9″ W.; thence to latitude 33°36′06.5″ N., longitude 117°53′16.3″ W.; returning to latitude 33°36′07.4″ N., longitude 117°53′19.2″ W.
(k) Area A-11. The entire water area within beginning at latitude 33°36′04.7″ N., longitude 117°53′01.9″ W.; thence to latitude 33°36′06.1″ N., longitude 117°53′00.5″ W.; thence to latitude 33°36′06.2″ N., longitude 117°52′59.0″ W.; thence to latitude 33°35′59.4″ N., longitude 117°52′51.1″ W.; thence to latitude 33°35′57.5″ N., longitude 117°52′50.9″ W.; thence to latitude 33°36′01.9″ N., longitude 117°52′57.3″ W.; thence to latitude 33°36′03.0″ N., longitude 117°53′00.4″ W.; returning to latitude 33°36′04.7″ N., longitude 117°53′01.9″ W.
(l) Area A-12. The entire water area within beginning at latitude 33°36′27.9″ N., longitude 117°54′40.4″ W.; thence to latitude 33°36′23.9″ N., longitude 117°54′41.8″ W.; thence to latitude 33°36′20.8″ N., longitude 117°54′29.9″ W.; thence to latitude 33°36′28.5″ N., longitude 117°54′20.2″ W.; returning to latitude 33°36′27.9″ N., longitude 117°54′40.4″ W.
(m) Area B-1. The entire water area within beginning at latitude 33°36′35.1″ N., longitude 117°54′28.8″ W.; thence to latitude 33°36′32.1″ N., longitude 117°54′22.1″ W.; thence to latitude 33°36′30.6″ N., longitude 117°54′22.8″ W; thence to latitude 33°36′30.5″ N., longitude 117°54′30.9″ W.; returning to latitude 33°36′35.1″ N., longitude 117°54′28.8″ W.
Note to § 110.95:
These anchorage areas are reserved for recreational and other small craft. Local law, including the City of Newport Beach Municipal Code 17.25.020, may provide for fore and aft moorings for recreational and small craft of such size and alignment as permitted by the harbor master.
[USCG-2010-0929, 77 FR 22491, Apr. 16, 2012]
§ 110.100 Los Angeles and Long Beach Harbors, Calif.
(a) [Reserved]
(b) Area A-2. Consisting of two parts in the outer basin of Fish Harbor on the east and west sides of Fish Harbor Entrance Channel described as follows:
(1) Part 1. Beginning at a point at the intersection of westerly side of Fish Harbor Entrance Channel and the outer jetty; thence southwesterly along the jetty about 900 feet to the shore; thence northerly about 500 feet; thence northeasterly about 650 feet, on a line parallel to jetty; thence southeasterly about 500 feet, along the westerly side of Fish Harbor Entrance Channel to the point of beginning.
(2) Part 2. Beginning at a point at the intersection of the east side of Fish Harbor Entrance Channel and Fish Harbor mole (outer Fish Harbor); thence northwesterly along channel line about 850 feet to the southerly side of the Fairway; thence northeasterly and easterly along the southerly side of the Fairway, about 478 and 565 feet respectively to its intersection with Fish Harbor mole; thence southerly and southwesterly along the mole to the point of beginning.
(c) Area B-1. Long Beach outer harbor along east side of Pier 400 beginning at latitude 33°44′22.8″ N., longitude 118°13′51.0″ W.; thence south to latitude 33°43′54.5″ N., longitude 118°13′50.0″ W.; thence southwesterly to latitude 33°43′46.0″ N., longitude 118°14′13.6″ W.; thence northwesterly to latitude 33°44′15.3″ N., longitude 118°14′26.6″ W.; thence northeasterly to latitude 33°44′25.1″ N., longitude 118°14′15.6″ W.; thence easterly to the beginning point.
(d) Area C-1. Long Beach outer harbor between Island Freeman and Island Chaffee beginning at latitude 33°44′20.0″ N., longitude 118°08′26.2″ W.; thence west to latitude 33°44′23.5″ N., longitude 118°09′32.6″ W.; thence north to latitude 33°44′52.8″ N., longitude 118°09′33.2″ W.; thence southeast to latitude 33°44′25.5″ N., longitude 118°08′26.2″ W.; thence south to the beginning point.
(e) Area E-1. Long Beach outer harbor northwest of Island Freeman beginning at latitude 33°44′55.0″ N., longitude 118°09′40.0″ W.; thence southwesterly to latitude 33°44′37.0″ N., longitude 118°09′48.5″ W.; thence northwesterly to latitude 33°44′52.0″ N., longitude 118°10′32.0″ W.; thence north to latitude 33°45′11.0″ N., longitude 118°10′32.0″ W.
(f) Restrictions. Special anchorage areas B-1, C-1, and E-1 are reserved for barges on mooring balls, unless otherwise authorized by the Captain of the Port Los Angeles-Long Beach.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD11-04-005, 71 FR 15036, Mar. 27, 2006]
§ 110.111 Marina del Rey Harbor, Calif.
An area in the main channel encompassed within the following described boundaries: Beginning at the northeasterly corner in position latitude 33°58′41.6″ N., longitude 118°26′50.8″ W.; thence southerly to latitude 33°58′30.2″ N., longitude 118°26′50.8″ W.; thence westerly to latitude 33°58′30.2″ N., longitude 118°26′55.1″ W.; thence northerly to latitude 33°58′41.6″ N., longitude 118°26′55.1″ W.; thence easterly to the point of origin. All coordinates referenced North American Datum 1983.
Note to 110.111:
The Marina del Rey Harbor Master, Los Angeles County, prescribes local regulations for mooring and boating activities in this area.
[USCG-2014-0142, 82 FR 2896, Jan. 10, 2017]
§ 110.115 Santa Barbara Harbor, Calif.
North of the Santa Barbara breakwater; seaward of the line of mean high water; and southwest of a line bearing 46°30′ from the north corner of Bath Street and Cabrillo Boulevard to the end of the Santa Barbara breakwater; excluding a fairway 225 feet wide, 100 feet from each side of and parallel to the Navy pier.
Note:
Fore and aft moorings will be allowed in this area conforming to the City of Santa Barbara Harbor Ordinance No. 2106 for yachts and small craft of such size and alignment as permitted by the harbor master.
§ 110.120 San Luis Obispo Bay, Calif.
(a) Area A-1. Area A-1 is the water area bounded by the San Luis Obispo County wharf, the shoreline, a line drawn from the southernmost point of Fossil Point to latitude 35°10′18.5″ N., longitude 120°43′38.5″ W.; thence to the southeast corner of the San Luis Obispo County wharf.
(b) Area A-2. Area A-2 is the water area enclosed by a line drawn from the outer end of Whaler Island breakwater at latitude 35°09′22″ N., longitude 120°44′56″ W., to the Marré Chimney at latitude 35°10′56″ N., longitude 120°44′31″ W.
Note:
The Port San Luis Harbor District prescribes local regulations for mooring and boating activities in these areas.
[CGD 72-24R, 38 FR 1928, Jan. 19, 1973]
§ 110.125 Morro Bay Harbor, Calif.
(a) Area A-1. Opposite the City of Morro Bay, beginning 50 feet west of the intersection of the west channel line and the prolongation of the center line of Seventh Street; thence in a generally southeasterly direction and parallel to the channel line for a distance of 450 yards; thence 166° and parallel to the revetment for a distance of 1,025 yards; thence 270° for a distance of 200 yards; thence 346° for a distance of about 1,425 yards to meet the prolongation of the center line of Seventh Street; and thence to the point of beginning.
(b) Area A-2. Beginning at a point 322° and 150 feet from the high water line on the most westerly part of Fairbanks Point; thence continuing on this bearing for a distance of 1,346 feet; thence 52° for a distance of 450 feet and thence generally southeasterly parallel to and 150 feet from the mean high water line to the point of beginning.
Note:
Moorings and boating activities will be allowed in these areas conforming to applicable City of Morro Bay ordinances and regulations adopted pursuant thereto.
§ 110.126 Monterey Harbor, Calif.
The waters of Monterey Harbor between the shoreline and the following coordinates: Beginning at a point on the shoreline at latitude 36°36′27.5″ N., longitude 121°53′35.0″ W.; thence to latitude 36°36′32.4″ N., longitude 121°53′31.0″ W., in an easterly direction to latitude 36°36′28.8″ N., 121°53′19.0″ W.; thence south to latitude 36°36′23.1″ N., longitude 121°53′19.0″ W.; thence to the north end of Municipal Wharf No. 1 at latitude 36°36′20.0″ N., longitude 121°53′28.0″ W.
[CGD 82-091, 47 FR 45878, Oct. 14, 1982]
§ 110.126a San Francisco Bay, Calif.
Richardson Bay Anchorage. That portion of Richardson Bay, north of a line bearing 257° from Peninsula Point to the shore at Sausalito, except for federally-maintained channels, and all channels approved for private use therein.
Note:
Mariners anchoring in the special anchorage area should consult applicable ordinances of the Richardson Bay Regional Agency and the County of Marin. These ordinances establish requirements on matters including the anchoring of vessels, placement of moorings, and use of anchored and moored vessels within the special anchorage area. Information on these local agency requirements may be obtained from the Richardson Bay Harbor Administrator.
[CGFR 69-109, 34 FR 17771, Nov. 4, 1969, as amended by CGD 78-126, 45 FR 10760, Feb. 19, 1980; CGD11-99-009, 65 FR 20086, Apr. 14, 2000]
§ 110.127 Lake Mohave and Lake Mead, Nevada and Arizona.
(a) Willow Beach, Ariz. That portion of Lake Mohave enclosed by the shore and a line connecting the following points, excluding a 100-foot-wide fairway, extending westerly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longitude
“a” 35°52′30″ N. | 114°39′35″ W.
“b” 35°52′10″ N. | 114°39′35″ W.
(b) Katherine, Ariz. That portion of Lake Mohave inclosed by the shore and a line connecting the following points, excluding a 100-foot-wide fairway, extending westerly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longitude
“a” 35°13′33″ N. | 114°34′38″ W.
“b” 35°13′05″ N. | 114°34′40″ W.
(c) El Dorado Canyon, Nev. That portion of Lake Mohave inclosed by the shore and a line connecting the following points, excluding a 50-foot-wide fairway, extending easterly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longitude
“a” 35°42′37″ N. | 114°42′21″ W.
“b” 35°42′08″ N. | 114°42′10″ W.
(d) Cottonwood Cove, Nev. That portion of Lake Mohave inclosed by the shore and a line connecting the following points, excluding a 200-foot-wide fairway extending northeasterly from the launching ramp, as established by the Superintendent Lake Mead Recreation Area:
Latitude | Longitude
“a” 35°29′46″ N. | 114°40′55″ W.
“b” 35°29′33″ N. | 114°40′45″ W.
(e) Overton Beach, Nev—(1) Area “A”. That portion of Lake Mead inclosed by the shore and lines connecting the following points, excluding two 300-foot-wide fairways, extending northwesterly and southwesterly from the launching ramps, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longitude
“a” 36°27′05″ N. | 114°21′48″ W.
“b” 36°27′15″ N. | 114°21′20″ W.
“c” 36°26′32″ N. | 114°20′45″ W.
“d” 36°25′49″ N. | 114°20′50″ W.
“e” 36°25′00″ N. | 114°21′27″ W.
“f” 36°25′19″ N. | 114°22′10″ W.
(f) Echo Bay, Nev. That portion of Lake Mead inclosed by the shore and lines connecting the following points, excluding a 100-foot-wide fairway, extending southwesterly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°18′30″ N. | 114°25′10″ W.
“b” 36°18′20″ N. | 114°24′00″ W.
“c” 36°17′35″ N. | 114°24′05″ W.
“d” 36°17′40″ N. | 114°24′27″ W.
(g) Callville Bay, Nev. That portion of Lake Mead inclosed by the shore and lines connecting the following points, excluding a 200-foot-wide fairway, extending southeasterly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°09′00″ N. | 114°42′40″ W.
“b” 36°08′10″ N. | 114°42′03″ W.
“c” 36°08′06″ N. | 114°42′40″ W.
(h) Las Vegas Wash, Nev. That portion of Lake Mead inclosed by the shore and a line connecting the following points, excluding a 200-foot-wide fairway, extending easterly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°07′23″ N. | 114°49′45″ W.
“b” 36°06′29″ N. | 114°49′45″ W.
(i) Hemenway Harbor, Nev. That portion of Lake Mead inclosed by the shore and lines connecting the following points, excluding a 100-foot-wide fairway, extending easterly from the launching ramp at Boulder Beach and a 600-foot-wide fairway, extending northeasterly from the launching ramp at Hemenway Harbor, both as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°04′05″ N. | 114°48′15″ W.
“b” 36°03′25″ N. | 114°48′10″ W.
“c” 36°01′20″ N. | 114°45′15″ W.
(j) Kingman Wash, Ariz. That portion of Lake Mead inclosed by the shore and a line connecting the following points, excluding a 100-foot-wide fairway, extending westerly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°02′34″ N. | 114°42′50″ W.
“b” 36°02′05″ N. | 114°43′05″ W.
(k) Temple Bar, Ariz. That portion of Lake Mead inclosed by the shore and lines connecting the following points, excluding a 200-foot-wide fairway, extending southwesterly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°02′21″ N. | 114°19′29″ W.
“b” 36°02′34″ N. | 114°18′46″ W.
“c” 36°02′03″ N. | 114°18′13″ W.
(l) Greggs, Ariz. That portion of Lake Mead inclosed by the shore and a line connecting the following points, excluding a 100-foot-wide fairway, extending northerly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°00′35″ N. | 114°13′49″ W.
“b” 36°00′35″ N. | 114°14′10″ W.
(m) Pierce Ferry, Ariz. That portion of Lake Mead inclosed by the shore and a line connecting the following points, excluding a 100-foot-wide fairway, extending easterly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°08′42″ N. | 113°59′24″ W.
“b” 36°07′18″ N. | 113°58′32″ W.
(n) South Bay, Ariz. That portion of Lake Mead inclosed by the shore and a line connecting the following points, excluding one 100-foot wide fairway, extending westerly from the launching ramp, as established by the Superintendent, Lake Mead Recreation Area:
Latitude | Longtitude
“a” 36°06′26″ N. | 114°06′13″ W.
“b” 36°05′00″ N. | 114°06′50″ W.
“c” 36°05′00″ N. | 114°06′13″ W.
Note:
Fixed moorings, piles, or stakes are prohibited. Single and fore-and-aft temporary moorings will be allowed. The anchoring of vessels and the placing of temporary moorings will be under the jurisdiction and at the discretion of the Superintendent, Lake Mead Recreation Area, National Park Service.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGFR 69-36, 34 FR 6577, Apr. 17, 1969; CGD 79-045, 44 FR 60091, Oct. 18, 1979]
§ 110.127a Lake Powell, Utah-Arizona.
(a) Castel Butte, Utah. That portion of Lake Powell inclosed by the shore and a line connecting the following points, excluding a 300-foot-wide fairway extending in an east-west direction perpendicular to the launching ramp, as established by the Superintendent, Glen Canyon National Recreation Area:
Latitude | Longtitude
“a” 37°43′45″ N. | 110°27′00″ W.
“b” 37°42′30″ N. | 110°27′57″ W.
(b) Bullfrog Basin, Utah. That portion of Lake Powell inclosed by the shore and a line connecting the following points, excluding a 300-foot-wide fairway, extending southeasterly from the launching ramp, as established by the Superintendent, Glen Canyon National Recreation Area:
Latitude | Longtitude
“a” 37°29′17″ N. | 110°42′28″ W.
“b” 37°28′44″ N. | 110°43′40″ W.
(c) Halls Crossing, Utah. That portion of Lake Powell inclosed by the shore and a line connecting the following points, excluding a 300-foot-wide fairway, extending northwesterly from the launching ramp, as established by the Superintendent, Glen Canyon National Recreation Area:
Latitude | Longtitude
“a” 37°28′24″ N. | 110°42′57″ W.
“b” 37°28′00″ N. | 110°43′21″ W.
“c” 37°27′46″ N. | 110°43′16″ W.
(d) Dangling Rope Canyon, Utah. That portion of Dangling Rope Canyon, Lake Powell, enclosed by the shoreline and a line connecting the following points, excluding a 200-foot-wide fairway, extending southerly from the marina, as established by the Superintendent, Glen Canyon National Recreation Area:
Latitude | Longtitude
“a” 37°06′48″ N. | 111°05′00″ W.
“b” 37°07′15″ N. | 111°05′03″ W.
“c” 37°07′19″ N. | 111°04′49″ W.
“d” 37°08′08″ N. | 111°04′00″ W.
“e” 37°07′30″ N. | 111°04′30″ W.
“f” 37°07′20″ N. | 111°04′15″ W.
(e) Wahweap, Arizona-Utah. That portion of Lake Powell inclosed by the shore and a line connecting the following points, excluding a 200-foot-wide fairway, extending northeasterly from the northerly launching ramp and a 300-foot-wide fairway, extending easterly from the southerly launching ramp, as established by the Superintendent, Glen Canyon National Recreation Area:
Latitude | Longtitude
“a” 37°00′21″ N. | 111°30′30″ W.
“b” 37°00′40″ N. | 111°30′00″ W.
“c” 36°59′10″ N. | 111°28′48″ W.
“d” 36°59′10″ N. | 111°29′24″ W.
Note:
Fixed moorings, piles, or stakes are prohibited. Single and fore-and-aft temporary moorings will be allowed. The anchoring of vessels and the placing of temporary moorings will be under the jurisdiction and at the discretion of the Superintendent, Glen Canyon National Recreation Area.
(f) Hite, Utah. That portion of Lake Powell enclosed by the shore and by lines connecting the following two sets of points, excluding a 200-foot-wide fairway extending westerly from the launching ramp on the far shore, as established by the Superintendent, Glen Canyon National Recreation area:
East Shore
Latitude | Longtitude
“a” 37°51′40″ N. | 110°23′45″ W.
“b” 37°51′40″ N. | 110°24′05″ W.
“c” 37°52′30″ N. | 110°24′00″ W.
“d” 37°52′30″ N. | 110°23′35″ W.
North Wash
Latitude | Longtitude
“a” 37°52′00″ N. | 110°24′45″ W.
“b” 37°52′40″ N. | 110°24′45″ W.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD 11-84-05, 49 FR 47603, Dec. 6, 1984]
§ 110.127b Flaming Gorge Lake, Wyoming-Utah.
(a) Buckboard Crossing, Wyo. That portion of Flaming Gorge Lake inclosed by the shore and a line connecting the following points, excluding a 150-foot-wide fairway, extending southeasterly from the launching ramp, as established by the Superintendent, Flaming Gorge National Recreation Area:
Latitude | Longtitude
“a” 41°14′50″ N. | 109°35′22″ W.
“b” 41°14′37″ N. | 109°35′12″ W.
(b) Squaw Hollow, Wyo. That portion of Flaming Gorge Lake inclosed by the shore and a line connecting the following points, excluding a 100-foot-wide fairway, extending southeasterly from the launching ramp, as established by the Superintendent, Flaming Gorge National Recreation Area:
Latitude | Longtitude
“a” 41°09′55″ N. | 109°33′18″ W.
“b” 41°09′48″ N. | 109°33′20″ W.
(c) Antelope Flat, Utah. That portion of Flaming Gorge Lake inclosed by the shore and a line connecting the following points, excluding a 150-foot-wide fairway, extending southeasterly from the launching ramp to a point beyond the floating breakwater and then westerly, as established by the Superintendent, Flaming Gorge National Recreation Area:
Latitude | Longtitude
“a” 40°57′46″ N. | 109°33′30″ W.
“b” 40°57′37″ N. | 109°33′37″ W.
(d) Lucerne Valley, Utah. That portion of Flaming Gorge Lake inclosed by the shore and a line connecting the following points, excluding a 300-foot-wide fairway extending southeasterly from the launching ramp, as established by the Superintendent, Flaming Gorge National Recreation Area:
Latitude | Longtitude
“a” 40°59′07″ N. | 109°34′54″ W.
“b” 40°58′54″ N. | 109°35′00″ W.
Note:
Fixed moorings, piles, or stakes are prohibited. Single and fore-and-aft temporary moorings will be allowed. The anchoring of vessels and the placing of temporary moorings will be under the jurisdiction and at the discretion of the Superintendent, Flaming Gorge National Recreation Area.
§ 110.127c Trinidad Bay, Calif.
The waters of Trinidad Bay, beginning at the southernmost point of Trinidad Head at latitude 41°03′04″ N., longitude 124°08′56″ W.; thence east to Prisoner Rock at latitude 41°03′09″ N., longitude 124°08′37″ W.; thence east to latitude 41°03′09″ N., longitude 124°08′19″ W., thence north to latitude 41°03′26″ N., longitude 124°08′21″ W.; thence following the shoreline to Trinidad Bay in a westerly and southerly direction to the point of beginning.
Note:
The area will be principally for use by sport and commercial fishing vessels. Temporary floats and buoys for anchoring will be allowed in the area. Fixed moorings, piles or stakes are prohibited. All moorings shall be placed so that no vessel when anchored or moored shall at any time extend beyond the limits of the area. The anchoring of all vessels and placing of all moorings will be under the supervision of the City of Trinidad or such other authority as may be designated by the City Council of the City of Trinidad, California.
[CGD 76-105, 42 FR 37811, July 25, 1977, as amended by CGD12 86-06, 51 FR 10198, Mar. 25, 1986]
§ 110.128 Columbia River at Portland, Oreg.
The waters of the Columbia River between Sand Island and Government Island, bounded on the west by pile dike U.S. 5.75 and a line extending true north from the northerly end of the dike to the south shore of Sand Island and bounded on the east by a line bearing 339°15′ true, from a point on Government Island at latitude 45°35′10″, longitude 122°32′41″, to the southerly shore of Sand Island.
§ 110.129 Island of Hawaii, Hawaii.
(a) Hilo Bay. The waters of Hilo Bay enclosed by a line beginning at 19°43′55.5″ N. latitude, 155°03′30″ W. longitude; thence to 19°44′08″ N. latitude, 155°04′19″ W. longitude; thence to 19°43′51″ N. latitude, 155°04′30″ W. longitude; thence to 19°44′10″ N. latitude, 155°05′29″ W. longitude; thence along the shoreline to the beginning point. (Datum: OHD)
(b) Kuhio Bay. The waters of Kuhio Bay enclosed by a line beginning at 19°44′13″ N. latitude, 155°03′25″ W. longitude; thence to 19°44′15″ N. latitude, 155°03′25″ W. longitude; thence along the shoreline to the beginning point. (Datum: OHD)
[CGD 76-186, 42 FR 62001, Dec. 8, 1977, as amended by CGD 96-026, 61 FR 33663, June 28, 1996. Redesignated by USCG-2018-0533, 85 FR 8173, Feb. 13, 2020]
§ 110.129a Island of Kauai, Hawaii.
(a) Nawiliwili Bay. The waters of Nawiliwili Bay enclosed by a line beginning at 21°57′12.5″ N. latitude, 159°21′38″ W. longitude; thence to 21°57′26″ N. latitude, 159°21′39.5″ W. longitude; thence along the shoreline to the beginning point. (Datum: OHD)
(b) [Reserved]
[CGD 76-186, 42 FR 62001, Dec. 8, 1977, as amended by CGD 96-026, 61 FR 33663, June 28, 1996. Redesignated by USCG-2018-0533, 85 FR 8173, Feb. 13, 2020]
§ 110.129b Island of Oahu, Hawaii. (Datum: OHD)
(a) Kaneohe Bay. (1) The waters of Kaneohe Bay enclosed by a line beginning at 21°26′28″ N. latitude, 157°46′00″ W. longitude; thence to 21°26′00″ N. latitude, 157°46′14″ W. longitude; thence to 21°26′20″ N. latitude, 157°47′24″ W. longitude; thence to 21°27′00″ N. latitude, 157°48′25″ W. longitude; thence to 21°26′46″ N. latitude, 157°48′37″ W. longitude; thence along the shoreline to the beginning point.
(b) Kaneohe Bay (2). The waters of Kaneohe Bay enclosed by a line beginning at 21°27′28″ N. latitude, 157°49′08″ W. longitude; thence to 21°28′10″ N. latitude, 157°50′03″ W. longitude; thence to 21°29′10″ N. latitude, 157°50′40″ W. longitude; thence to 21°30′46″ N. latitude, 157°50′14″ W. longitude; thence along the shoreline to the beginning point.
(c) Keehi Lagoon. The waters of Keehi Lagoon bounded by a line connecting the following points:
Latitude | Longtitude
21°19′35.0″ N | 157°54′06.0″ W
21°19′37.7″ N | 157°53′58.0″ W
21°19′06.4″ N | 157°53′41.9″ W
21°19′00.8″ N | 157°53′44.1″ W
21°18′59.9″ N | 157°53′49.7″ W
21°19′04.9″ N | 157°53′50.0″ W
and thence to the point of beginning.
(d) Sans Souci Beach. The waters of Sans Souci Beach enclosed by a line beginning at 21°15′49″ N. latitude, 157°49′31″ W. longitude; thence to 21°15′49.2″ N. latitude, 157°49′29″ W. longitude; thence to 21°15′56.2″ N. latitude, 157°49′31″ W. longitude; thence to 21°15′56″ N. latitude, 157°49′33″ W. longitude; thence to the beginning point.
(e) Iroquois Point Lagoon. The waters of Iroquois Point Lagoon enclosed by a line beginning at 21°19′53″ N. latitude, 157°58′30″ W. longitude; thence to 21°19′56″ N. latitude, 157°58′31″ W. longitude; thence along the shoreline to the beginning point.
(f) Hickam AFB Marina (1)a. The waters of Hickam AFB Marina enclosed by a line beginning at 21°19′13″ N. latitude, 157°57′40″ W. longitude; thence to 21°18′45″ N. latitude, 157°57′40″ W. longitude; thence to 21°18′45″ N. latitude, 157°57′28.5″ W. longitude; thence to 21°19′10″ N. latitude, 157°57′28.5″ W. longitude; thence along the shoreline to the beginning point.
(g) Hickam AFB Marina (2). The waters of Hickam AFB Marina enclosed by a line beginning at 21°19′11″ N. latitude, 157°57′10″ W. longitude; thence to 21°18′46.2″ N. latitude, 157°57′20″ W. longitude; thence to 21°18′46.2″ N. latitude, 157°57′05.2″ W. longitude; thence along the shoreline to the beginning point.
(h) Aiea Bay. The waters of Aiea Bay enclosed by a line beginning at 21°22′20″ N. latitude, 157°56′30″ W. longitude; thence to 21°22′27″ N. latitude, 157°56′40.5″ W. longitude; thence to 21°22′30″ N. latitude, 157°56′40.5″ W. longitude; thence to 21°22′37″ N. latitude, 157°56′22.5″ W. longitude; thence to 21°22′37″ N. latitude, 157°56′19″ W. longitude; thence along the shoreline to the beginning point.
[CGD 76-186, 42 FR 62001, Dec. 8, 1977, as amended at 43 FR 21881, May 22, 1978; CGD14-90-01, 56 FR 13762, Apr. 4, 1991. Redesignated by USCG-2018-0533, 85 FR 8173, Feb. 13, 2020]
§ 110.129c Apra Harbor, Guam. (Datum: WGS 84)
(a) The waters bounded by a line connecting the following points:
Latitude | Longtitude
13°27′45.5″ N | 144°39′34.8″ E
13°27′32.0″ N | 144°39′36.3″ E
and thence along the shoreline to the point of beginning.
(b) The waters bounded by a line connecting the following points:
Latitude | Longtitude
13°26′53.6″ N | 144°40′03.8″ E
13°27′04.0″ N | 144°40′04.8″ E
13°27′04.0″ N | 144°40′09.8″ E
13°27′10.0″ N | 144°40′09.8″ E
13°27′10.0″ N | 144°40′23.8″ E
13°26′51.0″ N | 144°40′23.8″ E
13°26′51.0″ N | 144°40′06.0″ E
and thence to the point of beginning.
[CGD14-89-01, 55 FR 27465, July 3, 1990. Redesignated by USCG-2018-0533, 85 FR 8173, Feb. 13, 2020]
Subpart B Anchorage Grounds
§ 110.130 Bar Harbor, Maine.
(a) Anchorage grounds. (1) Anchorage “A” is that portion of Frenchman Bay, Bar Harbor, ME enclosed by a rhumb line connecting the following points:
Latitude | Longitude
44°23′43″ N | 068°12′00″ W; thence to
44°23′52″ N | 068°11′22″ W; thence to
44°23′23″ N | 068°10′59″ W; thence to
44°23′05″ N | 068°11′32″ W; returning to start.
(2) Anchorage “B” is that portion of Frenchman Bay, Bar Harbor, ME enclosed by a rhumb line connecting the following points:
Latitude | Longitude
44°24′33″ N | 068°13′09″ W; thence to
44°24′42″ N | 068°11′47″ W; thence to copied
44°24′11″ N | 068°11′41″ W; thence to
44°24′02″ N | 068°13′03″ W; returning to start.
(b) Regulations. (1) Anchorage A is a general anchorage ground reserved for passenger vessels, small commercial vessels and pleasure craft. Anchorage B is a general anchorage ground reserved primarily for passenger vessels 200 feet and greater.
(2) These anchorage grounds are authorized for use year round.
(3) Temporary floats or buoys for marking anchors will be allowed in all anchorage areas.
(4) Fixed moorings, piles or stakes are prohibited.
(5) Any vessels anchored in this area shall be capable of moving and when ordered to move by the Captain of the Port shall do so with reasonable promptness.
(6) The anchoring of vessels is under the coordination of the local Harbormaster.
[CGD-01-02-027, 67 FR 68518, Nov. 12, 2002]
§ 110.131 Sheepscot River in the vicinity of Edgecomb, Maine.
(a) Anchorage grounds. All of the waters enclosed by a line starting from a point located at the southwestern end of Davis Island at latitude 43°59.655′ N., longitude 69°39.617′ W.; thence to latitude 43°59.687′ N., longitude 69°39.691′ W.; thence to latitude 43°59.847′ N., longitude 69°39.743′ W.; thence to latitude 43°59.879′ N., longitude 69°39.559′ W.; thence to latitude 43°59.856′ N., longitude 69°39.488′ W.; thence to latitude 43°59.771′ N., longitude 69°39.585′ W.; thence to the point of beginning. DATUM: NAD 83
(b) Regulations. (1) This anchorage is reserved for vessels of all types, with drafts of 3 to 12 feet.
(2) These anchorage grounds are authorized for use from May through October.
(3) Vessels are limited to a maximum stay of 1 week.
(4) Fixed moorings, piles or stakes are prohibited.
(5) Vessels must not anchor so as to obstruct the passage of other vessels proceeding to or from other anchorage spaces.
(6) Anchors must not be placed in the channel and no portion of the hull or rigging of any anchored vessel shall extend outside the limits of the anchorage area.
(7) The anchorage of vessels is under the coordination of the local Harbormaster.
[CGD01-07-011, 72 FR 70514, Dec. 12, 2007]
§ 110.132 Rockland Harbor, Maine.
(a) The anchorage grounds—(1) Anchorage A. Beginning at a point bearing 158°, 1,075 yards, from Rockland Breakwater Light; thence 252°, 2,020 yards, to a point bearing 224° from Rockland Breakwater Light; thence 345°, 740 yards, to a point bearing 242° from Rockland Breakwater Light; thence 72°, 1,300 yards, to a point bearing 222° from Rockland Breakwater Light; and thence 120°, 1,000 yards, to the point of beginning.
(2) Anchorage B. Beginning at a point bearing 273°, 400 yards, from Rockland Breakwater Light; thence 273°, 700 yards, to a point bearing 273° from Rockland Breakwater Light; thence 349°, 850 yards, to a point bearing 305° from Rockland Breakwater Light; thence 89°, 700 yards, to a point bearing 328° from Rockland Breakwater Light; and thence 169°, 900 yards, to the point of beginning.
(b) The regulations. (1) Anchorages A and B are general anchorage grounds reserved for merchant vessels, commercial vessels or passenger vessels over 65 feet in length. Fixed moorings, piles or stakes are prohibited.
(2) A distance of approximately 500 yards shall be left between Anchorages A and B for vessels entering or departing from the Port of Rockland. A distance of approximately 100 yards shall be left between Anchorage A and the Special Anchorage Area for vessels entering or departing facilities in the vicinity of Atlantic Point. Any vessel anchored in these anchorages shall be capable of moving and when ordered to move by the Captain of the Port shall do so with reasonable promptness.
(3) All other vessels within the Rockland Harbor area are prohibited from anchoring within 300 yards or operating within 100 feet of any navy yard, shipbuilding plant, power plant, oil terminal, marine terminal, munitions plant, military or naval arsenal or depot, warehouse, or freight pier without permission from the Captain of the Port, Rockland, Maine, or his authorized representative.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967. Redesignated by CGD-01-02-027, 67 FR 68518, Nov. 12, 2002; CGD-01-02-129, 68 FR 44888, July 31, 2003]
§ 110.133 Kennebec River in vicinity of Bath, Maine.
(a) The anchorage grounds. Vessels may anchor only within the following limits:
(1) Northward of a line bearing 54° true and extending from a point on Passmore's wharf in prolongation with the north side of Commerce Street, Bath, Maine, to a point on the shore in Woolwich, approximately 1,200 feet north of the Maine Central Railroad wharf.
(2) Southward of a line drawn from the derrick on the Bath Iron Works wharf to Sassanoa Point in Woolwich.
(b) The regulations. (1) Vessels in the north anchorage shall be so anchored as to leave a clear fairway of 150 feet channelward of the established harbor lines at Bath, and a clear fairway 200 feet from the east or Woolwich shore, for the passage of steamers, tows, rafts, and other watercraft.
(2) The launching of vessels into the waters between the anchorages or the bringing up of such vessels by their anchors will be permitted: Provided, That the vessels so launched shall be removed therefrom within 12 hours from the time of anchorage.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967. Redesignated by CGD-01-02-027, 67 FR 68518, Nov. 12, 2002]
§ 110.134 Portland Harbor, Maine.
(a) The anchorage grounds—(1) Anchorage A (general). Beginning at latitude 43°39′37″ N, longitude 070°14′35″ W; thence approximately 090° for 1550 yards to Fort Gorges Island Ledge Buoy 4; thence 350° for 300 yards; thence 025° for 780 yards; thence 303° for 750 yards; thence 254° for 560 yards; thence 186° for 750 yards and thence to the point of beginning.
(2) Anchorage B (general—primarily intended for deep draft vessels). Beginning at Fort Gorges Island Ledge Buoy 4; thence 062° to Little Diamond Island; thence along the southwestern shore to the pier on the southern end of Little Diamond Island; 133° for 1200 yards; 270° to House Island Light; thence along the western shore of House Island to Fort Scammel Point Light; thence 325° for 1700 yards to the point of beginning.
(3) Anchorage C. Bounded on the northwest by House Island; on the north by a line running 90° from House Island Light to Peak Island; on the east by the western shore of Peak Island, by a line running 198° from the westernmost point on Peak Island to Cushing Island, and by the shore of Cushing Island to its westernmost point; and on the southwest by a line running from the westernmost point on Cushing Island to Fort Scammel Point Light.
(b) The regulations. (1) Anchorage B is intended for general purposes, but especially for use by oil tankers and other large deep-draft ships entering harbor at night and intending to proceed to the dock allotted at daylight the following morning or as soon as practicable. This area is also to be used for quarantine anchorage. Vessels must be so anchored in this area as to leave at all times an open usable channel at least 100 feet wide for passage of ferry and other boats between Portland, Peak Island, and Bay Points. Any vessels anchored in this area shall be ready to move on short notice when ordered to do so by the Captain of the Port.
(2) Anchorage C is intended for use only by small vessels and for temporary anchorage.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD 83-1R, 48 FR 56578, Dec. 22, 1983. Redesignated by CGD-01-02-027, 67 FR 68518, Nov. 12, 2002]
§ 110.136 Lake Champlain, NY and VT.
(a) Burlington Harbor, Vt. (1) The waters bounded by a line connecting the following points:
Latitude | Longtitude
44°28′26.9″ N | 73°13′31.9″ W
44°28′26.4″ N | 73°13′25.6″ W
44°28′22.0″ N | 73°13′24.6″ W
44°28′12.0″ N | 73°13′32.5″ W
and thence along the breakwater to the point of the beginning. These positions have been converted to North American Datum 83.
(2) No vessel greater than 35 feet in length may use this anchorage and no vessel may remain at anchor longer than 7 days in any period unless specifically permitted to do so by the City of Burlington, Harbormaster.
(b) [Reserved]
[CGD1-90-064, 56 FR 12120, Mar. 22, 1991. Redesignated by CGD-01-02-027, 67 FR 68518, Nov. 12, 2002]
§ 110.138 Boston Harbor, Mass.
(a) The anchorage grounds—(1) Bird Island Anchorage. Beginning at a point bearing 93°, 1,400 yards, from the aerial beacon on top of the Boston Custom House tower; thence to a point bearing 81°, 1,600 yards, from the aerial beacon on top of the Boston Custom House tower; thence to a point bearing 102°, 3,100 yards, from the aerial beacon on top of the Boston Custom House tower; thence to a point bearing 109°, 3,050 yards, from the aerial beacon on top of the Boston Custom House tower; and thence to the point of beginning.
(2) President Roads Anchorage—(i) 40-foot anchorage. Beginning at a point bearing 237°, 522 yards from Deer Island Light; thence to a point bearing 254°, 2,280 yards from Deer Island Light; thence to a point bearing 261°, 2,290 yards from Deer Island Light; thence to a point bearing 278°, 2,438 yards from Deer Island Light; thence to a point bearing 319°, 933 yards from Deer Island Light; thence to a point bearing 319°, 666 yards from Deer Island Light; and thence to point of beginning.
(ii) 35-foot anchorage. Beginning at a point bearing 256°, 2,603 yards from Deer Island Light; thence to a point bearing 258°30′, 3,315 yards from Deer Island Light; thence to a point bearing 264°, 3,967 yards from Deer Island Light; thence to a point bearing 261°, 2,290 yards from Deer Island Light; and thence to point of beginning.
(3) Long Island Anchorage. East of Long Island, bounded as follows: Beginning at the southwesternmost point of Gallups Island; thence 270° to Long Island; thence southerly along the eastern shore line of Long Island to Bass Point; thence to the northernmost point of Rainsford Island; thence to Georges Island Gong Buoy 6; and thence to the point of beginning.
(4) Castle Island Anchorage. Bounded on the north by Castle Island and adjacent land; on the east by a line between Castle Rocks Fog Signal Light and Old Harbor Shoal Buoy 2; on the southeast by a line between Old Harbor Shoal Buoy 2 and Old Harbor Buoy 4; and on the west by a line running due north from Old Harbor Buoy 4 to the shore line at City Point.
(5) Explosives anchorage. In the lower harbor, bounded on the northeast by a line between the northeast end of Peddocks Island and the northeast end of Rainsford Island; on the northwest by Rainsford Island; on the southwest by a line between the western extremity of Rainsford Island and the westernmost point of Peddocks Island; and on the southeast by Peddocks Island.
(b) The regulations. (1) The Captain of the Port may authorize the use of the President Roads Anchorage as an explosives anchorage when he finds that the interests of commerce will be promoted and that safety will not be prejudiced thereby. Vessels anchored in this area shall move promptly upon notification by the Captain of the Port.
(2) In the Long Island Anchorage vessels shall anchor in the position designated by the Captain of the Port.
(3) Floats or buoys for marking anchors or moorings in place will be allowed in all areas. Fixed mooring piles or stakes are prohibited.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967. Redesignated by CGD-01-02-027, 67 FR 68518, Nov. 12, 2002]
§ 110.140 Buzzards Bay, Nantucket Sound, and adjacent waters, Mass.
(a) New Bedford Outer Harbor—(1) Anchorage A. West of Sconticut Neck, and shoreward of a line described as follows: Beginning at a point 100 yards southwest of Fort Phoenix Point; thence 154° along a line which passes 100 yards east of New Bedford Channel Buoys 8, 6, and 4, to a point bearing approximately 130°, 225 yards, from New Bedford Channel Buoy 4; thence 87°, 340 yards; thence 156° along a line approximately one mile to its intersection with a line ranging 87° from the cupola on Clarks Point; thence 87° to Sconticut Neck.
(2) Anchorage B. All waters bounded by a line beginning at 41°36′42.3″ N, 070°54′24.9″ W; thence to 41°36′55.5″ N, 070°54′06.6″ W; thence to 41°36′13.6″ N, 070°53′40.2″ W; thence to 41°36′11.1″ N, 070°54′07.6″ W; thence along the shoreline to the beginning point.
(b) Buzzards Bay near entrance to approach channel to Cape Cod Canal—(1) Anchorage C. West of a line parallel to and 850 feet westward from the centerline of Cleveland Ledge Channel; north of a line bearing 129° from the tower on Bird Island; east of a line bearing 25°30′ and passing through Bird Island Reef Bell Buoy 13; and south of a line bearing 270° from Wings Neck Light. Each vessel must obtain permission to proceed to Anchorage C from the U.S. Army Corps of Engineers Cape Cod Canal Control traffic controller.
(2) Anchorage D. Beginning at a point bearing 185°, 1,200 yards, from Hog Island Channel 4 Light; thence 129° to a point bearing 209°, approximately 733 yards, from Wings Neck Light; thence 209° to Southwest Ledge Buoy 10; thence 199° along a line to its intersection with a line bearing 129° from the tower on Bird Island; thence 309° to a point 850 feet easterly, right angle distance, from the centerline of Cleveland Ledge Channel; thence northeasterly along a line parallel to and 850 feet eastward from the centerline of Cleveland Ledge Channel to its intersection with a line bearing 218° 30′ from the point of beginning; thence 38°30′ to the point of beginning. Each vessel must obtain permission to proceed to Anchorage D from the U.S. Army Corps of Engineers Cape Cod Canal Control traffic controller.
(3) Anchorage L. The area of water bounded by lines connecting the following points: 41°30′11″ N, 070°48′10″ W to 41°30′46″ N, 070°48′45″ W, to 41°32′24″ N, 070°45′50″ W to 41°31′48″ N, 070°45′15″ W and thence to start.
(4) Anchorage M—(west side). The waters bounded by a line connecting the following points: 41-35-35N/70-44-47W to 41-36-24N/70-45-53W to 41-35-00N/70-47-53W to 41-34-12N/70-46-47W and thence to the beginning
(5) Each vessel that anchors in these anchorages must notify the U.S. Army Corps of Engineers Cape Cod Canal Control traffic controller when it anchors, and provide the vessel's name, length, draft, cargo, and its position.
(6) Each vessel anchored in these anchorages must notify U.S. Army Corps of Engineers Cape Cod Canal Control traffic controller when it weighs anchor.
(7) No vessel may anchor unless it maintains a bridge watch, guards and answers Channel 16 FM, and maintains an accurate position plot.
(8) No vessel may anchor unless it maintains the capability to get underway within 30 minutes; except with prior approval of the Coast Guard Captain of the Port Southeastern New England.
(9) No vessel may anchor in a “dead ship” status (propulsion or control unavailable for normal operations) without the prior approval of the Coast Guard Captain of the Port Southeastern New England.
(10) No vessel may conduct lightering operations within these anchorages.
(c) Vineyard and Nantucket Sounds—(1) Anchorage E. South of a line beginning at a point bearing 180° about 3.25 miles from Cuttyhunk Light; thence 65° to a point bearing 180°, 0.625 mile from Nashawena Lighted Whistle Buoy; thence 57°30′ passing 600 yards northerly of Middle Ground Lighted Bell Buoy 25A, to a point bearing 145°, 1.25 miles from Nobska Point Light; southwest of a line ranging 113° through West Chop Buoy 25 to East Chop Flats Bell Buoy 23; and west of a line bearing 163° between East Chop Flats Bell Buoy 23 and Lone Rock Buoy 1; and northerly of a line bearing 269° between Lone Rock Buoy 1 and a point on the mainland at Oak Bluffs about 0.30 mile southerly of Oak Bluffs Wharf.
(2) Anchorage F. Southeast of the Elizabeth Islands, north of a line ranging 97°30′ from Cuttyhunk Light toward Nashawena Lighted Whistle Buoy to a point 0.375 mile from that buoy; northwest of a line bearing 57°30′ from the last-named point to a point opposite the entrance to Woods Hole; and southwest of a line from the shore of Nonamesset Island bearing 114° and ranging through West Chop Light and East Chop Light.
(3) Anchorage G. South of a line beginning at a point on the mainland at Oak Bluffs about 0.30 mile southerly of Oak Bluffs Wharf bearing 89° to Lone Rock Buoy 1; thence 113° from Lone Rock Buoy 1 to Outer Flats Bell Buoy 17; thence 86° to Cross Rip Lightship; thence 118°30′ to Tuckernuck Shoal Bell Buoy 7; thence ranging 149° toward Brant Point Light to the breakwater at Brant Point.
(4) Anchorage H. In the vicinity of Squash Meadow shoal, east of a line ranging 163° through Squash Meadow West End Buoy 21; north of lines parallel to and 0.5 mile northerly from lines joining Lone Rock Buoy 1, Outer Flats Bell Buoy 17, and Cross Rip Lightship; and south of a line ranging 97° from East Chop Light toward Cross Rip Lightship.
(5) Anchorage I. Northerly of a line ranging 109° from Nobska Point Light toward Hedge Fence Lighted Horn and Gong Buoy 16, and of a line ranging 97°30′ through Hedge Fence East End Buoy to Halfmoon Shoal Lighted Bell Buoy 12, thence 73° to Handkerchief Shoal Buoy 16, and thence to the westernmost point of Monomoy Island.
(6) Anchorage J. East of a line bearing 329°, parallel to and 0.875 mile northeasterly of a line running from Brant Point Light through Tuckernuck Shoal Bell Buoy 7, from Coatue Beach to a point 1.25 miles southeasterly from a line between Halfmoon Shoal Lighted Bell Buoy 12 and Handkerchief Shoal Buoy 16; thence 73°, parallel to and 1.25 miles southeasterly from a line running from Halfmoon Shoal Lighted Bell Buoy 12 through Handkerchief Shoal Buoy 16, to a point bearing 215° from Stone Horse North End Lighted Bell Buoy 9; thence 35° to Stone Horse North End Lighted Bell Buoy 9; thence 70° to a point bearing 207° from Pollock Rip Lightship; and thence 27° through, and to a point 5.0 miles northeasterly from, Pollock Rip Lightship.
(7) Anchorage K. North of a line tangent to the southeasterly edge of Monomoy Point and extending to Bearse Shoal North End Buoy 2A and west of a line bearing 7° from Bearse Shoal North End Buoy 2A to Chatham Bar Buoy 2.
(d) The regulations. (1) Floats or buoys for marking anchors or moorings in place will be allowed in all areas. Fixed mooring piles or stakes are prohibited.
(2) Except in cases of great emergency, no vessels shall be anchored in New Bedford Outer Harbor, Buzzards Bay near the entrance to the approach channel to Cape Cod Canal, or Vineyard and Nantucket Sounds, outside of the anchorage areas defined in paragraphs (a) to (c) of this section.
(3) Anchors must not be placed outside the anchorage areas, nor shall any vessel be so anchored that any portion of the hull or rigging will at any time extend outside the boundaries of the anchorage area.
(4) Any vessel anchoring under the circumstances of great emergency outside any anchorage area must be placed near the edge of the channel and in such position as not to interfere with the free navigation of the channel, nor obstruct the approach to any pier nor impede the movement of any boat, and shall move away immediately after the emergency ceases or upon notification by an officer of the Coast Guard.
(5) A vessel upon being notified to move into the anchorage limits or to shift its position in anchorage grounds must get under way at once or signal for a tug, and must change position as directed with reasonable promptness.
(6) Whenever the maritime or commercial interests of the United States so require, any officer of the Coast Guard is hereby empowered to shift the position of any vessel anchored within the anchorage areas, of any vessel anchored outside the anchorage areas, and of any vessel which is so moored or anchored as to impede or obstruct vessel movements in any channel.
(7) Nothing in this section shall be construed as relieving the owner or person in charge of any vessel from the penalties of the law for obstructing navigation or for obstructing or interfering with range lights, or for not complying with the navigation laws in regard to lights, fog signals, or for otherwise violating the law.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD1 90-125, 56 FR 22644, May 16, 1991; 56 FR 40360, Aug. 14, 1991; CGD01-04-004, 70 FR 2355, Jan. 13, 2005; USCG-2006-25556, 72 FR 36327, July 2, 2007; USCG-2010-1119, 76 FR 35744, June 20, 2011]
§ 110.142 Nantucket Harbor, Mass.
(a) The anchorage grounds. In the Nantucket Harbor, beginning at a point 210 yards, 90°, from Brant Point Light; thence easterly to latitude 41°17′23″, longitude 70°05′14.5″; thence southerly to latitude 41°17′03″, longitude 70°05′14.5″; thence southwesterly to latitude 41°16′54″, longitude 70°05′23″; thence northwesterly to latitude 41°16′55″, longitude 70°05′31″; thence northeasterly to latitude 41°17′07.5″, longitude 70°05′27″; thence northeasterly to the point of beginning.
(b) The regulations. The anchorage is for the use of commercial and pleasure craft. Temporary floats or buoys for marking anchors or moorings in place will be allowed. Fixed mooring piles or stakes are prohibited. The anchoring of vessels including the placing of anchors and moorings is subject to the supervision and approval of the local harbor master.
§ 110.145 Narragansett Bay, R.I.
(a) East Passage—(1) Anchorage A. East of Conanicut Island, beginning at the easterly extremity of the Dumplings; extending 9° to a point at latitude 41°29′28″, longitude 71°21′05.5″; thence 356° for 5,350 feet; thence 24° for 5,700 feet; thence 12° for 1,100 feet; thence 311°30′ for 2,300 feet; thence 351° for 5,350 feet; thence 270° for 3,200 feet to the easterly side of Conanicut Island; thence generally along the easterly side of the island to a point on the easterly side of the island due west of the Dumplings; and thence due east to the point of beginning; excluding the approach of the Jamestown Ferry, a zone 900 feet wide to the southward of a line ranging 103° from a point, 300 feet north of the existing ferry landing toward the spire of Trinity Church, Newport.
(i) That portion of the area to the northward of the approach of the Jamestown Ferry shall be restricted for the anchorage of vessels of the U.S. Navy. In that portion of the area to the southward of the approach of the Jamestown Ferry, the requirements of the Navy shall predominate.
(ii) Temporary floats or buoys for marking anchors or moorings in place shall be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(2) Anchorage B. Off the west shore of Aquidneck Island to north of Coggeshall Point, northerly of a line ranging 075° from a point on the easterly end of Gould Island, latitude 41°32′13″, longitude 71°20′40.5″, toward the shore of Aquidneck Island; east of a line ranging 019° from the easternmost of the Dumplings to latitude 41°36′16″, longitude 71°17′48″; thence northeast to latitude 41°36′53″, longitude 71°17′07.5″; thence east to latitude 41°36′53″, longitude 71°16′40″; thence southwesterly to latitude 41°35′54″, longitude 71°17′17.5″; thence southeasterly to the shore at the easterly end of the north boundary of the cable area in the vicinity of Coggeshall Point; excluding the cable area in the vicinity of Coggeshall Point.
(i) Anchorage B-1. Off the southerly end of Prudence Island beginning at a point at latitude 41°34′08.9″, longitude 71°19′25.8″; thence 19° for 1,900 feet; thence 289° for 1,900 feet; thence 199° for 1,900 feet; thence 109° for 1,900 feet to the point of beginning.
(a) In this area the requirements of the Navy shall predominate.
(b) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(ii) [Reserved]
(3) Anchorage C.
(i) [Reserved]
(ii) West of Coasters Harbor Island, west of a line bearing 351° from Tracey Ledge Buoy 5 through Seventeen-foot Spot Buoy northeast of Gull Rocks; south of a line bearing 292° from the cupola at the Naval War College; east of a line ranging 19° from the easternmost of The Dumplings toward Dyer Island North Point Shoal Lighted Bell Buoy 12A; and north of latitude 41°30′22″ which parallel passes through a point 230 yards north of Rose Island Shoal Northeast End Buoy 8.
(iii) In this area the requirements of the Navy shall predominate.
(iv) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(4) Anchorage D. West of Goat Island, an area bounded by the following coordinates:
Northeast Corner: 41°29.484′ N, 071°19.975′ W
Northwest Corner: 41°29.484′ N, 071°20.578′ W
Southwest Corner: 41°29.005′ N, 071°20.578′ W
Southeast Corner: 41°29.005′ N, 071°19.975′ W
(i) In this area the requirements of the Navy shall predominate from May 1 to October 1, subject at all times to such adjustments as may be necessary to accommodate all classes of vessels which may require anchorage room.
(ii) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(iii) Should any part of an anchored vessel extend into the recommended vessel route in the East Passage of Narragansett Bay, a securite call notifying mariners of the vessel's exact position and status shall be made at least hourly on VHF channels 13 and 16.
(iv) As much as practicable vessels anchoring will do so in the following order:
(A) Primary anchoring point: 41°29.25′ N, 071°20.15′ W
(B) Secondary anchoring point: 41°29.38′ N, 071°20.45′ W
(C) Tertiary anchoring point: 41°29.15′ N, 071°20.50′ W
Note to paragraph (a):
“Anchoring point” is the intended position of the anchor at rest on the bottom of the anchorage. All coordinates referenced use datum: NAD 83.
(5) Anchorage E. South of Coasters Harbor Island, east of a line bearing 341° from the outer end of Briggs Wharf to the southwestern shore of Coasters Harbor Island near the War College Building; and north of a line ranging 265° from the flagstaff at Fort Greene toward Rose Island Light.
(i) In this area the requirements of the naval service will predominate from May 1 to October 1, but will at all times be subject to such adjustment as may be necessary to accommodate all classes of vessels that may require anchorage room.
(ii) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(b) West Passage—(1) Anchorage H. North of a line 1,000 yards long bearing 88° from Bonnet Point; west of a line bearing 3° from the eastern end of the last-described line; and south of a line ranging 302° through a point 200 yards south of the Kearny wharf toward the church spire at South Ferry, Boston Neck.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(2) Anchorage I. North of a line 1,000 yards long bearing 88° from Bonnet Point to the shore at Austin Hollow; east of a line bearing 183° from Dutch Island Light; and south of a line ranging 302° through a point 200 yards south of the Kearny wharf toward the church spire at South Ferry, Boston Neck.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(3) Anchorage J. At Saunderstown, south of a line ranging 110° from the south side of the ferry wharf toward the cable crossing sign on Dutch Island; west of a line ranging 192° from Plum Beach Shoal Buoy 1 PB toward the east shore of The Bonnet; and north of a line from the shore ranging 108° toward Dutch Island Light and the north end of the wharf at Beaver Head.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(4) Anchorage K. In the central and southern portion of Dutch Island Harbor, north of a line ranging 106° from Beaver Head Point Shoal Buoy 2 toward the Jamestown standpipe; east of a line ranging 14° from Beaver Head Point Shoal Buoy 2 toward the inshore end of the engineer wharf, Dutch Island; southeast of a line ranging 50° from Dutch Island Light toward the windmill north of Jamestown; and south of a line parallel to and 100 yards southwesterly from a line ranging 132° from the engineer wharf, Dutch Island, and the west ferry wharf, Jamestown.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(5) Anchorage L. North of a line ranging 101° from a point on shore 300 yards northerly of the Saunderstown ferry wharf toward the entrance to Round Swamp, Conanicut Island; west of a line bearing 15° parallel to and 1,000 feet westerly from a line joining the western point of Dutch Island and Twenty-three Foot Rock Buoy 4, and a line ranging 6° from Dutch Island Light toward Warwick Light; and south of a line ranging 290° from Sand Point, Conanicut Island, to Wickford Harbor Light, and a line bearing 226° from Wickford Harbor Light to Poplar Point tower.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(6) Anchorage M. East and north of Dutch Island, northeast of a line ranging 316° from the inshore end of the west ferry wharf, Jamestown, toward the north end of Dutch Island to a point bearing 88°, 200 yards, from the engineer wharf, Dutch Island, thence ranging 3° toward the shore of Conanicut Island at Slocum Ledge; north of a line 200 yards off the Dutch Island shore ranging 281° from the entrance to Round Swamp toward a point on shore 300 yards northerly from the Saunderstown ferry wharf; east of a line ranging 15° from the western point of Dutch Island to Twenty-three Foot Rock Buoy 4; and south of a line bearing 77° from Twenty-three Foot Rock Buoy 4 to the shore.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(7) Anchorage N. West of the north end of Conanicut Island, south of a line bearing 262° from Conanicut Island Light; east of a line bearing 8° from Twenty-three Foot Rock Buoy 4; and north of a line ranging 290° from Sand Point toward Wickford Harbor Light.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(c) Bristol Harbor—(1) Anchorage O. South of the south line of Franklin Street extended westerly; west of a line bearing 164°30′ parallel to and 400 feet westerly from the State harbor line between Franklin and Constitution Streets, and of a line ranging 244° from a point on the north line of Constitution Street extended 400 feet beyond the State harbor line toward Usher Rock Buoy 3; and north of the north line of Union Street extended to the Popasquash Neck shore.
(i) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(d) The regulations. (1) Except in cases of great emergency, no vessel shall be anchored in the entrances to Narragansett Bay, in Newport Harbor, or in Bristol Harbor, outside of the anchorage areas defined in paragraphs (a), (b) and (c) of this section.
(2) Anchors must not be placed outside the anchorage areas, nor shall any vessel be so anchored that any portion of the hull or rigging shall at any time extend outside the boundaries of the anchorage area. However, Anchorage D (paragraph (a)(4) of this section) is exempt from this requirement.
(3) Any vessel anchoring under the circumstances of great emergency outside the anchorage areas must be placed near the edge of the channel and in such position as not to interfere with the free navigation of the channel, nor obstruct the approach to any pier, nor impede the movement of any boat, and shall move away immediately after the emergency ceases, or upon notification by an officer of the Coast Guard.
(4) A vessel upon being notified to move into the anchorage limits or to shift its position on anchorage grounds must get under way at once or signal for a tug, and must change position as directed with reasonable promptness.
(5) Whenever the maritime or commercial interests of the United States so require, any officer of the Coast Guard is hereby empowered to shift the position of any vessel anchored within the anchorage areas, of any vessel anchored outside the anchorage areas, and of any vessel which is so moored or anchored as to impede or obstruct vessel movements in any channel.
(6) Nothing in this section shall be construed as relieving the owner or person in charge of any vessel from the penalties of the law for obstructing navigation or for obstructing or interfering with range lights, or for not complying with the navigation laws in regard to lights, fog signals, or for otherwise violating the law.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967]
Editorial Note:For Federal Register citations affecting § 110.145, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.146 Long Island Sound.
(a) Anchorage grounds—
(1) Bridgeport Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
41°04′52″ N | 73°14′04″ W; thence to
41°03′45″ N | 73°14′04″ W; thence to
41°03′45″ N | 73°11′39″ W; thence to
41°02′50″ N | 73°12′08″ W; thence to
41°02′50″ N | 73°16′18″ W; thence to
41°04′52″ N | 73°16′18″ W; returning to point of origin.
(2) New Haven North Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
41°12′18″ N | 72°52′36″ W; thence to
41°12′18″ N | 72°49′36″ W; thence to
41°10′12″ N | 72°48′18″ W; thence to
41°10′12″ N | 72°52′12″ W; thence to
41°11′06″ N | 72°53′06″ W; returning to point of origin.
(3) New Haven South Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
41°09′30″ N | 72°47′48″ W; thence to
41°08′36″ N | 72°47′24″ W; thence to
41°08′36″ N | 72°51′24″ W; thence to
41°09′30″ N | 72°51′24″ W; returning to point of origin.
(4) New London Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
41°14′11″ N | 072°15′38″ W; thence to
41°15′05″ N | 072°16′02″ W; thence to
41°15′39″ N | 072°13′21″ W; thence to
41°14′45″ N | 072°12′57″ W; returning to point of origin.
(5) Northport Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
40°58′48″ N | 073°16′30″ W; thence to
40°57′42″ N | 073°11′42″ W; thence to
40°56′30″ N | 073°13′30″ W; thence to
40°57′36″ N | 073°18′12″ W; returning to point of origin.
(6) Port Jefferson Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
41°01′48″ N | 073°04′54″ W; thence to
41°01′48″ N | 073°00′00″ W; thence to
41°00′18″ N | 073°00′00″ W; thence to
41°00′18″ N | 073°04′54″ W; returning to point of origin.
(7) Riverhead Anchorage Ground. That portion of Long Island Sound enclosed by a line connecting the following points:
Latitude | Longitude
41°03′00″ N | 072°42′00″ W; thence to
41°04′00″ N | 072°36′00″ W; thence to
41°02′00″ N | 072°35′24″ W; thence to
41°01′24″ N | 072°41′24″ W; returning to point of origin.
(8) All coordinates referenced use datum: NAD 83.
(b) General regulations. (1) These anchorages are designated for general purposes, but are intended primarily for use by commercial vessels of 300 gross tons and greater and all tank vessels including tank barges. Except in emergencies, commercial vessels of 300 gross tons and greater and all tank vessels, including tank barges, anchoring in the Captain of the Port Long Island Sound Zone inside the line of demarcation shall anchor in the anchorage grounds described above.
(2) Prior to anchoring in the anchorage area, all vessels shall notify the Coast Guard Captain of the Port via VHF-FM Channel 16.
(3) In anchorages where lightering and bunkering operations are authorized, the Captain of the Port must be notified at least four hours in advance of a vessel conducting lightering or bunkering operations, as required by 156.118 of this title. In addition, all lightering and bunkering operations must be done in accordance with 156.120 of this title.
(4) Within an anchorage, navigation is prohibited within 500 yards of an anchored vessel that is conducting bunkering or lightering operations. In accordance with the “Regulated Navigation Area: Long Island Sound Marine Inspection and Captain of the Port Zone,” 33 CFR 165.153(d)(7), navigation also is prohibited within 100 yards of a vessel engaged in commercial service.
(5) Any vessel conducting lightering or bunkering operations shall display by day a red flag at its mast head or at least 10 feet above the upper deck if the vessel has no mast, and by night the flag must be illuminated by spotlight. These signals shall be in addition to day signals, lights, and whistle signals required by rules 30 (33 U.S.C. 2030) and 35 (33 U.S.C. 2035) of the Inland Navigation Rules when at anchor in a general anchorage area.
(6) Except as otherwise provided, a vessel may not occupy an anchorage for more than 30 days, unless the vessel obtains written permission from the Captain of the Port.
(7) If a request is made for the long-term lay up of a vessel, the Captain of the Port may establish special conditions with which the vessel must comply in order for such a request to be approved.
(8) The Captain of the Port may prescribe specific conditions for vessels anchoring within the anchorage grounds described in this section, pursuant to 33 CFR 109.05. These conditions may include, but are not limited to: The number and location of anchors; scope of chain; readiness of the engineering plant and equipment; use of tugs; and requirements for maintaining communication guards on selected radio frequencies.
(9) No vessel in such condition that it is likely to sink or otherwise become a menace or obstruction to navigation or anchorage of other vessels shall occupy an anchorage, except in cases where unforeseen circumstances create conditions of imminent peril to personnel, and then only for such period as may be authorized by the Captain of the Port.
(10) All vessels anchored within the designated anchorage grounds shall comply with the regulations found in 33 CFR 164.19 and shall maintain a continuous bridge watch by a licensed deck officer proficient in English, monitoring VHF-FM Channel 16. This individual shall confirm that the ship's crew performs frequent checks of the vessel's position to ensure the vessel is not dragging anchor. A second VHF-FM radio monitoring Channel 13 is strongly recommended.
(11) Anchors shall be placed well within the anchorage grounds so that no portion of the hull or rigging will at any time extend outside of the anchorage area.
(12) The Coast Guard Captain of the Port may close the anchorage area and direct vessels to depart the anchorage during periods of adverse weather or at other times as deemed necessary in the interest of port safety and security.
(13) Any vessel anchored in these grounds must be capable of getting underway if ordered by the Captain of the Port and must be able to do so within two (2) hours of notification by the Captain of the Port. If a vessel will not be able to get underway within two (2) hours of notification, permission must be requested from the Captain of the Port to remain in the anchorage. No vessel shall anchor in a “dead ship” status (propulsion or control unavailable for normal operations) without prior approval of the Captain of the Port.
(14) Fixed moorings, piles or stakes are prohibited.
[USCG-2008-0171, 75 FR 76277, Dec. 8, 2010]
§ 110.147 New London Harbor, Conn.
(a) The anchorage grounds—(1) Anchorage A. In the Thames River east of Shaw Cove, bounded by lines connecting points which are the following bearings and distances from Monument, Groton (latitude 41°21′18″ N., longitude 72°04′48″ W.): 243°, 1,400 yards; 246°, 925 yards; 217°, 1,380 yards; and 235°, 1,450 yards.
(2) Anchorage B. In the Thames River southward of New London, bounded by lines connecting points which are the following bearings and distances from New London Harbor Light (latitude 41°18′59″ N., longitude 72°05′25″ W.): 002°, 2,460 yards; 009°, 2,480 yards; 026°, 1,175 yards; and 008°, 1,075 yards.
(3) Anchorage C. In the Thames River southward of New London Harbor, bounded by lines connecting a point bearing 100°, 450 yards from New London Harbor Light, a point bearing 270°, 575 yards from New London Ledge Light (latitude 41°18′21″ N., longitude 72°04′41″ W.), and a point bearing 270°, 1,450 yards from New London Ledge Light.
(4) Anchorage D. In Long Island Sound approximately two miles west-southwest of New London Ledge Light, bounded by lines connecting points which are the following bearings and distances from New London Ledge Light: 246°, 2.6 miles; 247°, 2.1 miles; 233°, 2.1 miles; and 235°, 2.6 miles.
(5) Anchorage E. The waters at the mouth of New London Harbor one mile southeast of New London Ledge Light beginning at latitude 41°17′26″ N., longitude 72°04′21″ W.; thence northeasterly to latitude 41°17′38″ N., longitude 72°03′54″ W.; thence southeasterly to latitude 41°16′50″ N., longitude 72°03′16″ W.; and thence southwesterly to latitude 41°16′38″ N. longitude 72°03′43″ W.; and thence northwesterly to the point of beginning.
(6) Anchorage F. The waters off the mouth of New London Harbor two miles southeast of New London Ledge Light beginning at latitude 41°16′00″ N., longitude 72°03′13″ W.; thence westerly to latitude 41°16′00″ N., longitude 72°03′38″ W.; thence northerly to latitude 41°16′35″ N., longitude 72°03′38″ W.; thence easterly to latitude 41°16′35″ N., longitude 72°03′13″ W.; and thence southerly to the point of beginning.
(b) The regulations. (1) Anchorage A is for barges and small vessels drawing less than 12 feet.
(2) Anchorage F is reserved for the use of naval vessels and, except in cases of emergency, no other vessel may anchor in Anchorage F without permission from the Captain of the Port, New London, CT.
(3) Except in emergencies, vessels shall not anchor in New London Harbor or the approaches thereto outside the anchorages defined in paragraph (a) of this section unless authorized to do so by the Captain of the Port.
[CGD3-80-4A, 46 FR 48193, Oct. 1, 1981, as amended by CGD3 85-56, 51 FR 32318, Sept. 11, 1986]
§ 110.148 Johnsons River at Bridgeport, Conn.
(a) The anchorage grounds. In Johnsons River, beginning at a point “A” latitude 41°10′12.3″, longitude 73°09′50.2″; thence westerly to a point “B” latitude 41°10′12.3″, longitude 73°09′52.1″; thence southwesterly to point “C” latitude 41°10′10″, longitude 73°09′54.9″; thence south southwesterly to point “D” latitude 41°10′05″, longitude 73°09′56.1″; thence southeasterly to point “E” latitude 41°10′04″, longitude 73°09′55.9″; thence northeasterly to point “F” latitude 41°10′05″, longitude 73°09′54.5″; thence northerly to point “G” latitude 41°10′05.8″, longitude 73°09′54.5″; thence northeasterly to the point of beginning.
(b) The regulations. The anchorage is for use by commercial and pleasure craft. Temporary floats or buoys for marking anchors or moorings will be allowed. The anchoring of vessels and placing of temporary anchors or mooring piles are under the jurisdiction of the local harbor master. Fixed mooring piles or stakes will not be allowed.
§ 110.149 Narragansett Bay, RI.
(a) Brenton Point anchorage ground. An area bounded by the following coordinates: 41°22′37.1″ N, 71°14′40.3″ W; thence to 41°20′42.8″ N, 71°14′40.3″ W; thence to 41°18′24.1″ N, 71°20′32.5″ W; thence to 41°20′22.6″ N, 71°20′32.5″ W; thence back to point of origin.
(b) The following regulations apply in the Brenton Point anchorage ground.
(1) Prior to anchoring within the anchorage area, all vessels shall notify the Coast Guard Captain of the Port via VHF-FM Channel 16.
(2) Except as otherwise provided, no vessel may occupy this anchorage ground for a period of time in excess of 96 hours without prior approval of the Captain of the Port.
(3) If a request is made for the long-term lay up of a vessel, the Captain of the Port may establish special conditions with which the vessel must comply in order for such a request to be approved.
(4) No vessel in such condition that it is likely to sink or otherwise become a menace or obstruction to navigation or anchorage of other vessels shall occupy an anchorage except in cases where unforeseen circumstances create conditions of imminent peril to personnel and then only for such period as may be authorized by the Captain of the Port.
(5) Anchors shall be placed well within the anchorage areas so that no portion of the hull or rigging will at any time extend outside of the anchorage area.
(6) The Coast Guard Captain of the Port may close the anchorage area and direct vessels to depart the anchorage during periods of adverse weather or at other times as deemed necessary in the interest of port safety and security.
(7) Any vessel anchored in these grounds must be capable of getting underway if ordered by the Captain of the Port and must be able to do so within two hours of notification by the Captain of the Port. If a vessel will not be able to get underway within two hours of notification, permission must be requested from the Captain of the Port to remain in the anchorage. No vessel shall anchor in a “dead ship” status (propulsion or control unavailable for normal operations) without prior approval of the Captain of the Port.
(8) Brenton Point anchorage ground is a general anchorage area reserved primarily for commercial vessels waiting to enter Narragansett Bay.
(9) Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes will not be allowed.
(10) All coordinates referenced use datum: NAD 83.
[USCG-2009-1131, 77 FR 43517, July 25, 2012]
§ 110.150 Block Island Sound, N.Y.
(a) The anchorage ground. A 3/4- by 2-mile rectangular area approximately 3 miles east-northeast of Gardiners Island with the following coordinates: latitude 41°06′12″ N., longitude 72°00′05″ W., latitude 41°07′40″ N., longitude 72°01′54″ W.; latitude 41°08′12″ N., longitude 72°01′10″ W.; latitude 41°06′46″ N., longitude 71°59′18″ W.
(b) The regulations. This anchorage ground is for use of U.S. Navy submarines. No vessel or person may approach or remain within 500 yards of a U.S. Navy submarine anchored in this anchorage ground.
[CGFR 70-114A, 36 FR 5604, Mar. 25, 1971]
§ 110.155 Port of New York.
(a) Long Island Sound—(1) Anchorage No. 1. Southwest of a line between Neptune Island and Glen Island ranging from Aunt Phebe Rock Light and tangent to the north edge of Glen Island; southwest of a line tangent to the northeast edge of Glen Island and Goose Island breakwater; southwest of a line bearing southeasterly from the southwest end of Goose Island breakwater and on range with the south gable of the Casino on the northeast end of Glen Island; west of a line ranging from the east edge of Goose Island breakwater to the west edge of the north end of Hart Island; west of Hart Island; and northwest of a line extending from Hart Island Light to Locust Point; excluding from this area, however, (i) the waters northeast of a line ranging 303° from the southwest end of Hart Island; northwest of a line ranging from the water tank at the north end of Davids Island 207°40′ to the northwest end of City Island; and south of latitude 40°52′12″; and (ii) the waters west of Hunter Island; and south of a line ranging from the most southerly end of Glen Island tangent to the most northerly end of Hunter Island.
(i) Boats shall not anchor in this area in buoyed channels.
(ii) Boats shall be so anchored as to leave at all times an open, usable channel, at least 50 feet wide, west and south of Glen Island.
Note:
Special anchorage areas in this anchorage are described in § 110.60.
(2) [Reserved]
(b) East River—(1) Anchorage No. 6. On Hammond Flats north of a line bearing 260° from the head of the pier on Throgs Neck at the foot of Pennyfield Avenue to the north tower of Bronx-Whitestone Bridge at Old Ferry Point.
(2) [Reserved]
(3) Anchorage No. 8. North of a line bearing 259° between the north tower of the Bronx-Whitestone Bridge at Old Ferry Point and a point at latitude 40°47′57″, longitude 73°52′16″; thence east of a line bearing 0° to latitude 40°48′06″; thence southeast of a line parallel to the bulkhead extending northeasterly to latitude 40°48′20″; thence north of a line bearing 296° to shore.
(4) Anchorage No. 9. East of a line from College Point Reef Light tangent to the west side of College Point; and south of a line from College Point Reef Light to Whitestone Point.
(5) Anchorage No. 10. An area in Flushing Bay, beginning at a point on shore at La Guardia Airport at latitude 40°46′49″, longitude 73°52′21″; thence to latitude 40°47′20″, longitude 73°51′55″; and thence to a point on shore at College Point at latitude 40°47′38″, longitude 73°51′15″; and an area on the west side of Bowery Bay, beginning at a point on shore at latitude 40°46′58″, longitude 73°53′46″; thence to latitude 40°47′03″, longitude 73°53′39″; thence to latitude 40°47′00″, longitude 73°53′31″; thence to latitude 40°46′55″, longitude 73°53′32″; and thence to a point on shore at latitude 40°46′49″, longitude 73°53′39″.
Note:
Special anchorage areas in this anchorage are described in § 110.60.
(6) Anchorage No. 11. An area in East River beginning at a point on a pierhead at latitude 40°47′55″, longitude 73°53′19.5″; thence to latitude 40°47′40″, longitude 73°51′58″; and thence to a point on shore at latitude 40°47′16″, longitude 73°52′15″.
(7) [Reserved]
(8) Anchorage No. 14. In Hallets Cove, east of a line from a point on shore 100 feet west of the southerly prolongation of 2d Street, Astoria, to Gibbs Point.
(c) Hudson River—(1) Anchorage No. 16. North of a line on a range with the north side of the north pier of the Union Dry Dock and Repair Company Shipyard, Edgewater, New Jersey; west of a line ranging 25° from a point 120 yards east of the east end of said pier to a point (500 yards from the shore and 915 yards from the Fort Lee flagpole) on a line ranging approximately 100°22′ from the Fort Lee flagpole toward the square chimney on the Medical Center Building at 168th Street, Manhattan; and south of said line ranging between the Fort Lee flagpole and the square chimney on the Medical Center Building.
(i) When the use of Anchorage No. 16 is required by naval vessels, the vessels anchored therein shall move when the Captain of the Port directs them.
(ii) [Reserved]
(2) Anchorage No. 17. All waters of the Hudson River bound by the following points: 40°56′26.66″ N, 073°55′12.06″ W; thence to 40°56′22.54″ N, 073°54′49.77″ W; thence to 40°55′56.00″ N, 073°54′58.00″ W; thence to 40°55′54.15″ N, 073°54′46.96″ W; thence to 40°54′18.43″ N, 073°55′21.12″ W; thence to 40°52′27.59″ N, 073°56′14.32″ W; thence to 40°51′34.20″ N, 073°56′52.64″ W; thence to 40°51′20.76″ N, 073°57′31.75″ W; thence along the shoreline to the point of origin (NAD 83).
(i) When the use of Anchorage No. 17 is required by naval vessels, the vessels anchored therein shall move when the Captain of the Port directs them.
(ii) [Reserved]
(3) Anchorage No. 18-A. East of lines bearing 8° from the northwest corner of the crib icebreaker north of the New York Central Railroad Company drawbridge across Spuyten Duyvil Creek (Harlem River) to a point 250 yards offshore and on line with the New York Central Railroad signal bridge at the foot of West 231st Street, extended, at Spuyten Duyvil, Bronx, New York; thence bearing 19° to the channelward face of the Mount St. Vincent Dock at the foot of West 261st Street, Riverdale, Bronx, New York.
(i) When the use of Anchorage No. 18-A is required by naval vessels the vessels anchored therein shall move when the Captain of the Port directs them.
(4) Anchorage No. 18. All waters of the Hudson River bound by the following points: 40°56′54.0″ N, 073°54′40.0″ W; thence to 40°56′51.0″ N, 073°54′24.0″ W; thence to 40°55′53.0″ N, 073°54′40.0″ W; thence to 40°55′56.0″ N, 073°54′58.0″ W; thence to the point of origin (NAD 83).
(i) This anchorage ground is reserved for use by ships only.
(ii) [Reserved]
(5) Anchorages No. 19 East and 19 West—(i) Anchorage No. 19 East. All waters of the Hudson River bound by the following points: 40°49′42.6″ N, 073°57′14.7″ W; thence to 40°49′45.9″ N, 073°57′22.0″ W; thence to 40°49′52.0″ N, 073°57′22.0″ W; thence to 40°50′08.3″ N, 073°57′10.8″ W; thence to 40°50′55.4″ N, 073°56′59.7″ W; thence to 40°51′02.5″ N, 073°56′57.4″ W; thence to 40°51′00.8″ N, 073°56′49.4″ W; thence along the shoreline to the point of origin.
(ii) Anchorage No. 19 West. All waters of the Hudson River bound by the following points: 40°46′56.3″ N, 073°59′42.2″ W; thence to 40°47′36.9″ N, 073°59′11.7″ W; thence to 40°49′31.3″ N, 073°57′43.8″ W; thence to 40°49′40.2″ N, 073°57′37.6″ W; thence to 40°49′52.4″ N, 073°57′37.6″ W; thence to 40°49′57.7″ N, 073°57′47.3″ W; thence to 40°49′32.2″ N, 073°58′12.9″ W; thence to 40°49′00.7″ N, 073°58′33.1″ W; thence to 40°48′28.7″ N, 073°58′53.8″ W; thence to 40°47′38.2″ N, 073°59′31.2″ W; thence to 40°47′02.7″ N, 073°59′57.4″ W; thence to the point of origin.
(iii) The following regulations apply to 33 CFR 110.155(c)(5)(i) and (ii):
(A) No vessel may conduct lightering operations in these anchorage grounds without permission from the Captain of the Port. When lightering is authorized, the Captain of the Port New York must be notified at least four hours in advance of a vessel conducting lightering operations as required by 156.118 of this title.
(B) Any vessel conducting lightering or bunkering operations shall display by day a red flag (46 CFR 35.30-1; Pub 102; International Code of Signals signaling instructions) at its mast head or at least 10 feet above the upper deck if the vessel has no mast, and by night the flag must be illuminated by spotlight. These signals shall be in addition to day signals, lights and whistle signals as required by rules 30 (33 U.S.C 2030 and 33 CFR 83.30) and 35 (33 USC 2035 and 33 CFR 83.35) of the Inland Navigation Rules when at anchor in a general anchorage area.
(C) Within an anchorage, fishing and navigation are prohibited within 500 yards of an anchored vessel displaying a red flag.
(D) These anchorage grounds are only authorized for use by tugs and/or barges.
(E) No vessel may occupy this anchorage ground for a period of time in excess of 96 hours without prior approval of the Captain of the Port.
(F) No vessel may anchor in Anchorage No. 19 East or No. 19 West without permission from the Captain of the Port.
(G) Each vessel shall report its position within Anchorage No. 19 East or No. 19 West to the Captain of the Port immediately after anchoring.
(H) All coordinates referenced use datum: NAD 83.
(6) Anchorage No. 19-A. An area located west of Hyde Park enclosed by the coordinates starting at 41°48′35″ N 073°57′00″ W; to 41°48′35″ N 073°56′44″ W; to 41°47′32″ N 073°56′50″ W; to 41°47′32″ N 073°57′10″ W; thence back to 41°48′35″ N 073°57′00″ W (NAD 1983).
(i) No vessel may anchor in Anchorage 19-A from December 16 to the last day of February without permission from the Captain of the Port, New York.
(ii) No vessel less than 20 meters in length may anchor in Anchorage 19-A without prior approval of the Captain of the Port, New York.
(d) Upper Bay—(1) Anchorage No. 20-A. That area enclosed by coordinates starting at 40°42′02.5″ N., 74°02′25.5″ W.; to 40°42′06.5″ N., 74°02′19.5″ W.; to 40°42′05.0″ N., 74°01′58.4″ W.; to 40°41′54.5″ N., 74°01′59.2″ W.; thence to 40°41′53.0″ N., 74°02′23.0″ W.
(i) See 33 CFR 110.155 (d)(6), (d)(16), and (l).
(2) Anchorage No. 20-B. That area enclosed by coordinates starting at 40°41′47.0″ N., 74°02′31.5″ W.; to 40°41′42.0″ N., 74°01′02.0″ W.; to 40°41′35.3″ N., 74°02′04.2″ W., to 40°41′29.9″ N., 74°02′07.8″ W.; to 40°41′42.6″ N., 74°02′32.7″ W.; thence back to 40°41′47.0″ N., 74°02′31.5″ W.
(i) See 33 CFR 110.155 (d)(6), (d)(16), and (l).
(3) Anchorage No. 20-C. That area enclosed by coordinates starting at 40°41′42.0″ N., 74°02′43.0″ W.; to 40°41′25.4″ N., 74°02′10.7″ W.; to 40°41′01.7″ N., 74°02′26.2″ W.; to 40°41′09.0″ N., 74°02′41.5″ W.; to 40°41′20.0″ N., 74°02′59.2″ W.; thence back to 40°41′42.0″ N., 74°02′43.0″ W.
(i) See 33 CFR 110.155 (d)(6), (d)(16), and (l).
(4) Anchorage No. 20-D. That area enclosed by coordinates starting at 40°41′09.5″ N., 74°02′49.5″ W.; to 40°40′59.2″ N., 74°02′27.9″ W.; to 40°40′44.5″ N., 74°02′37.5″ W.; to 40°40′42.7″ N., 74°03′07.6″ W.; thence back to 40°41′09.5″ N., 74°02′49.5″ W.
(i) See 33 CFR 110.155 (d)(6), (d)(16), and (l).
(5) Anchorage No. 20-E. That area enclosed by coordinates starting at 40°40′38.2″ N., 74°02′59.6″ W.; to 40°40′39.4″ N., 74°02′40.9″ W.; to 40°40′09.2″ N., 74°03′00.7″ W.; to 40°40′24.4″ N., 74°03′24.6″ W.; thence back to 40°40′38.2″ N., 74°02′59.6″ W.
(i) See 33 CFR 110.155 (d)(6), (d)(16), and (l).
(6) No vessel may occupy this anchorage for a period of time in excess of 72 hours without the prior approval of the Captain of the Port.
(7) Anchorage No. 20-F. All waters bound by the following points: 40°40′12.2″ N, 074°03′39.9″ W; thence to 40°39′53.9″ N, 074°03′09.6″ W; thence to 40°39′38.9″ N, 074°03′19.5″ W; thence to 40°39′53.5″ N, 074°03′53.7″ W; thence to the point of origin (NAD 83).
(i) See 33 CFR 110.155 (d)(9), (d)(16), and (l).
(ii) [Reserved]
(8) Anchorage No. 20-G. That area enclosed by coordinates starting at 40°39′30.1″ N., 74°04′08.0″ W.; to 40°39′32.0″ N., 74°03′53.5″ W.; to 40°39′27.5″ N., 74°03′42.5″ W.; to 40°39′13.0″ N., 74°03′51.0″ W.; to 40°39′09.5″ N., 74°04′23.1″ W.; thence back to 40°39′30.1″ N., 74°04′08.0″ W.
(i) See 33 CFR 110.155 (d)(9), (d)(16), and (l).
(9) This anchorage is designated a naval anchorage. The Captain of the Port may permit commercial vessels to anchor temporarily in this anchorage, ordinarily not more than 24 hours, when the anchorage will not be needed for naval vessels. Upon notification of an anticipated naval arrival, any commercial vessel so anchored must relocate at its own expense.
(10) Anchorage No. 21-A. That area enclosed by coordinates starting at 40°40′22.5″ N., 74°01′35.2″ W.; to 40°40′20.5″ N., 74°01′27.7″ W.; to 40°39′48.9″ N., 74°01′22.4″ W.; to 40°38′54.7″ N., 74°02′18.9″ W.; to 40°39′03.0″ N., 74°02′26.3″ W.; thence back to 40°40′22.5″ N., 74°01′35.2″ W.
(i) See 33 CFR 110.155 (d)(16) and (l).
(ii) No vessel may occupy this anchorage for a period of time in excess of 96 hours without prior approval of the Captain of the Port.
(11) Anchorage No. 21-B. That area enclosed by coordinates starting at 40°40′23.8″ N., 74°02′10.9″ W.; to 40°40′26.2″ N., 74°01′49.5″ W.; to 40°40′22.5″ N., 74°01′35.2″ W.; to 40°39′03.0″ N., 74°02′26.3″ W.; to 40°38′54.7″ N., 74°02′18.9″ W.; to 40°38′43.7″ N., 74°02′30.3″ W.; to 40°39′19.3″ N., 74°03′03.3″ W.; to 40°39′22.3″ N., 74°03′02.4″ W.; to 40°40′18.6″ N., 74°02′25.5″ W.; thence back to 40°40′23.8″ N., 74°02′10.9″ W.
(i) See 33 CFR 110.155 (d)(16) and (l).
(ii) No vessel with a draft of 10 feet (3.048 meters) or less may occupy this anchorage without the prior approval of the Captain of the Port.
(iii) No vessel may occupy this anchorage for a period of time in excess of 96 hours without prior approval of the Captain of the Port.
(12) Anchorage No. 21-C. That area enclosed by coordinates starting at 40°39′19.3″ N., 74°03′03.3″ W.; to 40°38′43.7″ N., 74°02′30.3″ W.; to 40°38′41.6″ N., 74°02′32.5″ W.; to 40°38′03.0″ N., 74°02′48.7″ W.; to 40°38′03.0″ N., 74°03′03.5″ W.; to 40°38′38.4″ N., 74°03′15.5″ W.; thence back to 40°39′19.3″ N., 74°03′03.3″ W.
(i) See 33 CFR 110.155 (d)(16) and (l).
(ii) No vessel with a draft of 33 feet (10.0584 meters) or less may occupy this anchorage without the prior approval of the Captain of the Port.
(iii) No vessel may occupy this anchorage for a period of time in excess of 96 hours without prior approval of the Captain of the Port.
(13) Anchorage No. 23-A. That area enclosed by coordinates starting at 40°38′36.5″ N., 74°04′13.5″ W.; to 40°38′37.0″ N., 74°03′49.0″ W.; to 40°38′23.4″ N., 74°03′37.2″ W.; to 40°37′49.5″ N., 74°03′25.7″ W.; to 40°37′49.8″ N., 74°03′50.1″ W.; to 40°37′50.0″ N., 74°03′50.2″ W.; to 40°37′53.0″ N., 74°04′07.0″ W.; thence back to 40°38′36.5″ N., 74°04′13.5 W.
(i) See 33 CFR 110.155 (d)(16) and (l).
(ii) No vessel may occupy this anchorage for a period of time in excess of 48 hours without the prior approval of the Captain of the Port.
(iii) No vessel with a length overall in excess of 670 feet (204.216 meters) may occupy this anchorage without the prior approval of the Captain of the Port.
(iv) No vessel with a draft of 40 feet (12.192 meters) or more may occupy this anchorage without the prior approval of the Captain of the Port unless it anchors within 5 hours after ebb current begins at the Narrows.
(v) See 33 CFR 334.85 for information on anchoring near the U.S. Navy restricted area adjacent to this anchorage.
(14) Anchorage No. 23-B. That area enclosed by coordinates starting at 40°37′49.8″ N., 74°03′50.1″ W.; to 40°37′49.5″ N., 74°03′25.7″ W.; to 40°37′27.0″ N., 74°03′18.1″ W.; to 40°37′23.0″ N., 74°03′59.0″ W.; to 40°37′30.0″ N., 74°04′04.0″ W.; to 40°37′37.5″ N., 74°03′46.0″ W.; thence back to 40°37′49.8″ N., 74°03′50.1″ W.
(i) See 33 CFR 110.155(d)(13) (ii) and (iv), (d)(16), and (l).
(ii) No vessel with a length overall of 670 feet (204.216 meters) or less may occupy this anchorage without the prior approval of the Captain of the Port.
(iii) See 33 CFR 334.85 for information on anchoring near the U.S. Navy restricted area adjacent to this anchorage.
(15) Anchorage No. 24. That area enclosed by coordinates starting at 40°37′23.0″ N., 74°03′59.0″ W.; to 40°37′27.0″ N., 74°03′18.1″ W.; to 40°36′40.1″ N., 74°03′02.2″ W.; to 40°36′25.5″ N., 74°02′56.4″ W.; to 40°36′21.0″ N., 74°03′11.0″ W.; to 40°36′25.0″ N., 74°03′17.5″ W.; thence back to 40°37′23.0″ N., 74°03′59.0″ W.
(i) See 33 CFR 110.155(d)(13) (ii) and (iv), (d)(16), and (l).
(ii) No vessel with a length overall of less than 800 feet (243.84 meters), or with a draft of less than 40 feet (12.192 meters) may occupy this anchorage without the prior approval of the Captain of the Port.
(16) Any vessel anchored in or intending to anchor in Federal Anchorage 20-A through 20-G, 21-A through 21-C, 23-A and 23-B, 24 or 25 must comply with the following requirements:
(i) No vessel may anchor unless it notifies the Captain of the Port when it anchors, of the vessel's name, length, draft, and its position in the anchorage.
(ii) Each vessel anchored must notify the Captain of the Port when it weighs anchor.
(iii) No vessel may conduct lightering operations unless it notifies the Captain of the Port before it begins lightering operations.
(iv) Each vessel lightering must notify the Captain of the Port at the termination of lightering.
(v) No vessel may anchor unless it maintains a bridge watch, guards and answers Channel 16 FM, and maintains an accurate position plot.
(vi) If any vessel is so close to another that a collision is probable, each vessel must communicate with the other vessel and the Captain of the Port on Channel 16 FM and shall act to eliminate the close proximity situation.
(vii) No vessel may anchor unless it maintains the capability to get underway within 30 minutes except with prior approval of the Captain of the Port.
(viii) No vessel may anchor in a “dead ship” status (propulsion or control unavailable for normal operations) without the prior approval of the Captain of the Port.
(ix) Each vessel in a “dead ship” status must engage an adequate number of tugs alongside during tide changes. A tug alongside may assume the Channel 16 FM radio guard for the vessel after it notifies the Captain of the Port.
(x) No vessel may lighter in a “dead ship” status without prior approval from the Captain of the Port.
(e) Lower Bay—(1) Anchorage No. 25. That area enclosed by coordinates starting at 40°35′58.2″ N., 74°02′18.4″ W.; to 40°36′12.0″ N., 74°01′29.0″ W.; to 40°36′03.0″ N., 74°00′52.5″ W., to 40°34′57.5″ N., 74°00′25.0″ W.; to 40°34′40.0″ N., 74°01′03.0″ W.; to 40°34′53.0″ N., 74°01′56.1″ W.; to 40°35′23.9″ N., 74°02′04.8″ W.; thence back to 40°35′58.2″ N., 74°02′18.4″ W.
(i) See 33 CFR 110.155(d)(16) and (l).
(ii) When the use of this anchorage is required by naval vessels, any commercial vessels anchored therein must move when directed by the Captain of the Port.
(iii) No vessel may occupy this anchorage for a period of time in excess of 96 hours without prior approval of the Captain of the Port.
(f) Lower Bay, Raritan Bay, Sandy Hook Bay, and Atlantic Ocean—(1) Anchorage No. 26. In Raritan and Sandy Hook Bays all waters bound by the following points: 40°30′06.74″ N., 074°10′04.96″ W.; thence to 40°28′59.44″ N., 074°05′00.00″ W.; thence to 40°28′44.94″ N., 074°05′00.00″ W.; thence to 40°29′05.02″ N., 074°07′30.56″ W.; thence to 40°29′17.49″ N., 074°10′16.50″ W.; thence to the point of origin (NAD 83).
(2) Anchorage No. 27. In the Atlantic Ocean all waters bound by the following points: 40°28′49.27″ N., 074°00′12.13″ W.; thence to 40°28′52.12″ N., 074°00′00.56″ W.; thence to 40°28′40.88″ N., 073°58′51.95″ W.; thence to 40°25′57.91″ N., 073°54′55.56″ W.; thence to 40°23′45.55″ N., 073°54′54.89″ W.; thence to 40°23′45.38″ N., 073°58′32.10″ W.; thence along the shoreline to the point of origin (NAD 83).
(3) Anchorage No. 28. In Lower Bay all waters bound by the following points: 40°30′02.30″ N., 074°08′52.69″ W.; thence to 40°29′10.10″ N., 074°04′59.65″ W.; thence to 40°29′09.99″ N., 074°02′57.75″ W.; thence to 40°31′52.89″ N., 074°02′39.89″ W.; thence to 40°31′59.72″ N., 074°03′25.13″ W.; thence to 40°31′28.57″ N., 074°03′40.70″ W.; thence to 40°30′26.24″ N., 074°05′11.46″ W.; thence to 40°30′19.01″ N., 074°06′21.37″ W.; thence to 40°30′21.53″ N., 074°08′46.19″ W.; thence to the point of origin (NAD 83).
(g)-(h) [Reserved]
(i) Arthur Kill—(1) Anchorage No. 41. The passage between Pralls Island and Staten Island included between a line running 29° from the extreme northwest point of Pralls Island to a point on Staten Island and a line from the southern point of Pralls Island to the north side of the mouth of Neck Creek at Travis, Staten Island.
(2) Anchorage No. 42. East of lines ranging from the head of the Tottenville Shipyard Company pier at Tottenville, Staten Island, to the first pier of the Outerbridge Crossing west from the Staten Island shore, thence to Arthur Kill Light 10, thence to Arthur Kill Light 14, and thence to Arthur Kill Lighted Buoy 16; and south of a line from thence to Smoking Point.
(j) Raritan Bay—(1) Anchorage No. 44. An area in Raritan Bay located at the junction of Arthur Kill and Raritan River, beginning at a point at latitude 40°30′07″, longitude 74°15′30″; thence to latitude 40°30′01″, longitude 74°15′30″; thence to latitude 40°29′27″, longitude 74°15′06″; thence to latitude 40°29′24″, longitude 74°15′01″; thence to latitude 40°29′15″, longitude 74°14′55″; thence to latitude 40°29′14″, longitude 74°15′25″; thence to latitude 40°29′48″, longitude 74°15′48″; and thence to the point of beginning.
(i) The anchorage is restricted to deep-draft vessels except that barges may moor in that portion of the anchorage southerly of latitude 40°29′22″.
(ii) No vessel shall occupy the deep-draft portion of the anchorage for a longer period than 48 hours without a permit from the Captain of the Port.
(2) Anchorage No. 45. West of the Raritan Bay Channel leading into Arthur Kill; north of the Raritan River Channel leading into Raritan River; and east of the Cutoff Channel between Raritan River and Arthur Kill, except that part of the said area occupied by Anchorage No. 44.
(i) Vessels must not anchor in the channel to Keyport Harbor west of lines ranging from Keyport Channel Buoy 1 to Keyport Channel Buoy 9, thence through Keyport Channel Buoys 11 and 13 to the northeast corner of the easterly steamboat wharf; and east of a line extending from a point 400 yards west of Keyport Channel Buoy 1 tangent to the west shore at the mouth of Matawan Creek.
(ii) [Reserved]
(k) [Reserved]
(l) General regulations. (1) No vessel in excess of 800 feet (243.84 meters) in length overall or 40 feet (12.192 meters) in draft may anchor unless it notifies the Captain of the Port at least 48 hours prior to entering Ambrose Channel.
(2) Except in cases of great emergency, no vessel shall be anchored in the navigable waters of the Port of New York outside of the anchorage areas established in this section, nor cast anchor within a cable or pipe line area shown on a Government chart, nor be moored, anchored, or tied up to any pier, wharf, or vessel in such manner as to obstruct or endanger the passage of any vessel in transit by, or to or from, adjacent wharves, piers, or slips.
(3) No vessel shall occupy for a longer period than 30 days, unless a permit is obtained from the Captain of the Port for that purpose, any anchorage for which the time of occupancy is not otherwise prescribed in this section. No vessel in a condition such that it is likely to sink or otherwise become a menace or obstruction to navigation or anchorage of other vessels shall occupy an anchorage except in an emergency, and then only for such period as may be permitted by the Captain of the Port.
(4) Whenever, in the opinion of the Captain of the Port, such action may be necessary, that officer may require any or all vessels in any designated anchorage area to moor with two or more anchors.
(5) Every vessel whose crew may be reduced to such number that it will not have sufficient men on board to weigh anchor at any time shall be anchored with two anchors, with mooring swivel put on before the crew shall be reduced or released, unless the Captain of the Port shall waive the requirement of a mooring swivel.
(6) Anchors of all vessels must be placed well within the anchorage areas, so that no portion of the hull or rigging shall at any time extend outside the boundaries of the anchorage area.
(7) Any vessel anchoring under circumstances of great emergency outside of the anchorage areas must be placed near the edge of the channel and in such position as not to interfere with the free navigation of the channel nor obstruct the approach to any pier nor impede the movement of any boat, and shall move away immediately after the emergency ceases, or upon notification by the Captain of the Port.
(8) Operations near commercial mooring buoys permitted by the District Engineer, U.S. Army Corps of Engineers.
(i) No vessel shall continuously occupy a mooring when a vessel in regular traffic requires the berth or when navigation would be menaced or inconvenienced thereby.
(ii) No vessel shall moor or anchor in any anchorage in such a manner as to interfere with the use of a duly authorized mooring buoy. Nor shall any vessel moored to a buoy authorized by the District Engineer, U.S. Army Corps of Engineers be moored such that any portion of that vessel comes within 50 feet of a marked or dredged channel.
(iii) No vessel shall be operated within the limits of an anchorage at speed exceeding 6 knots when in the vicinity of a moored vessel.
(iv) In an emergency the Captain of the Port may shift the position of any unattended vessel moored in or near any anchorage.
(9) Barge dispensing stations and stake boats may be anchored in such places as the Captain of the Port may designate.
(10) Upon approval of the District Engineer, Corps of Engineers, the Captain of the Port may permit wrecking plant or other vessels legally engaged in recovering sunken property, or in laying or repairing pipe lines or cables legally established, or plant engaged in dredging operations, to anchor within channels of the Port of New York. Permit issued by the Captain of the Port is not necessary for plant engaged upon works of river and harbor improvement under the supervision of the District Engineer, but the District Engineer will notify the Captain of the Port in advance of all such proposed work.
(11) Whenever the maritime or commercial interests of the United States so require, the Captain of the Port is hereby empowered to shift the position of any vessel anchored within the anchorage areas, of any vessel anchored outside the anchorage areas, of any vessel which is so moored or anchored as to impede or obstruct vessel movements in any channel or obstruct or interfere with range lights and of any vessel which, lying at the exterior end of a pier or alongside an open bulkhead, obstructs or endangers the passage of vessels in transit by, or to or from, adjacent wharf property or impedes the movements of vessels entering or leaving adjacent slips.
(12) A vessel upon being notified to move into the anchorage limits or to shift its position on anchorage grounds, shall get under way at once or signal for a tug, and shall change position as directed, with reasonable promptness.
(13) Nothing in this section shall be construed as relieving any vessel or the owner or person in charge of any vessel from the penalties of law for obstructing navigation or for obstructing or interfering with range lights, or for not complying with the navigation laws in regard to lights, fog signals, or for otherwise violating law.
(14) Any vessel prohibited by these rules from anchoring in a specific anchorage because of the vessel's length or draft may anchor in the anchorage with permission from the Captain of the Port.
(m) Anchorages for vessels carrying explosives. (1) [Reserved]
(2) Anchorage No. 49-F (emergency naval anchorage). That portion of Sandy Hook Bay bounded by a line bearing 170°, 3,800 yards, from a point bearing 281°30′, 2,050 yards from Sandy Hook Light; thence 260°, 500 yards; thence 350°, 3,800 yards; thence 080°, 500 yards, to the point of beginning.
(i) This anchorage is to be used for the anchorage of naval vessels during emergencies only.
(ii) No pleasure or commercial craft shall navigate or moor within this area at any time when naval vessels which are moored in the area display a red flag by day or a red light by night.
(3) Anchorage No. 49-G (naval anchorage). That portion of Sandy Hook Bay bounded by a line bearing 208°, 1,350 yards, from a point bearing 292°30′, 3,600 yards, from Sandy Hook Light; thence 298°, 620 yards; thence 002°, 1,250 yards; thence 107°, 1,150 yards, to the point of beginning.
(i) No pleasure or commercial craft shall navigate or moor within this area at any time when vessels which are moored in the area display a red flag by day or a red light by night.
(n) Regulations for explosive anchorages. (1) Anchorages Nos. 49-F and 49-G are reserved for vessels carrying explosives. All vessels carrying explosives shall be within these areas when anchored, except as provided in paragraph (n)(6) of this section.
(2) A written permit shall be obtained from the Captain of the Port before vessels carrying explosives, or on which explosives are to be loaded, may proceed to the anchorages provided for them; and no vessel shall occupy a berth in such anchorage except by authority of such permit, which permit may be revoked at any time.
(3) Vessels used in connection with loading or unloading explosives on vessels in anchorage areas, including tugs and stevedore boats, shall carry a written permit from the Captain of the Port. The Captain of the Port may, in his discretion, require every person having business on board vessels which are being loaded with explosives, other than members of the crew, to have a pass from the Captain of the Port in such form as he shall prescribe. Such permit or pass shall be shown whenever required by him or by his authorized agents.
(4) Whenever any vessel not fitted with mechanical power anchors in the explosives anchorages while carrying explosives, the Captain of the Port may require the attendance of a tug upon such vessel when in his judgment such action is necessary.
(5) Vessels carrying explosives shall comply with the general regulations in paragraph (l) of this section when applicable.
(6) The District Engineer, Corps of Engineers, may authorize, in writing, a vessel carrying explosives for use on river and harbor works or on other work under Federal permit issued by the District Engineer to anchor in or near the vicinity of such work without a permit from the Captain of the Port. The District Engineer will prescribe the quantities of such explosives allowed on such vessel and the conditions under which they are to be stored and handled, and will furnish the Captain of the Port with a copy of such safety instructions together with a copy of his written authorization.
(7) Every vessel loading, unloading, transporting, or containing explosives shall display by day a red flag at least 16 square feet in area at its masthead, or at least 10 feet above the upper deck if the vessel has no mast, and shall display by night a red light in the same position specified for the flag.
(8) When local regulations of any place require previous local authority for the transfer of explosives or fireworks between vessels or between a vessel and a wharf or other place ashore, the Captain of the Port will permit the removal from the anchorage of such vessel containing explosives to any place covered by such local regulations only when he is satisfied that the required local authority has been granted.
Note:
The anchorage in this section are regulated under Title I, Ports and Waterways Safety Act of 1972 as stated in § 110.1a(a) of this part. The penalties for violating regulations under this Act are stated in § 110.1a(b) of this part.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967]
Editorial Note:For Federal Register citations affecting § 110.155, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.156 Randall Bay, Freeport, Long Island, N.Y.
(a) The anchorage grounds. Southward of a line 312 feet south of and parallel to the south side of Casino Street; eastward of a line 215 feet east of and parallel to the east side of West Side Avenue, said line extending southerly to a point 233 feet north of the prolonged north side of Clinton Street; northeastward of a line from the last-mentioned point to a point 243 feet southerly of the prolonged south side of Clinton Street and 210 feet east of the east side of Prospect Street; eastward of a line 210 feet east of and parallel to the east side of Prospect Street; northward of a line 25 feet north of and parallel to the prolonged north side of Suffolk Street; westward of a line 210 feet west of and parallel to the west side of South Long Beach Avenue, said line extending northerly to a point 222 feet south of the prolonged south side of Queens Street; southwestward of a line from the last-mentioned point to a point 74 feet northerly of the prolonged north side of Queens Street and 120 feet west of the west side of Roosevelt Avenue; and westward of a line 120 feet west of and parallel to the west side of Roosevelt Avenue.
(b) The regulations. (1) When applied for, a berth in this anchorage, if available, may be assigned to any vessel by the Captain of the Port of Long Island Sound.
(2) The Captain of the Port is authorized to issue permits for maintaining mooring buoys within the anchorage. The method of anchoring these buoys shall be as prescribed by the Captain of the Port.
(3) No vessel shall anchor in the anchorage in such manner as to interfere with the use of a duly authorized mooring buoy.
(4) No vessel shall be navigated within the anchorage at a speed exceeding six knots.
(5) In case of emergencies, the Captain of the Port is authorized to shift the position of any unattended vessel moored in or near the anchorage.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2012-0306, 77 FR 37313, June 21, 2012]
§ 110.157 Delaware Bay and River.
(a) The anchorage grounds—(1) Anchorage A off the entrance to the Mispillion River. In Delaware Bay southwest of Brandywine Channel beginning at latitude 38°53′57″ N., longitude 75°08′00″ W., thence northwesterly to latitude 39°01′22″ N., longitude 75°13′25″ W., thence southwesterly to latitude 39°00′49″ N., longitude 75°14′57″ W., thence southeasterly to latitude 38°53′22″ N., longitude 75°09′26″ W., thence northeasterly to the point of beginning. Supervision over the anchoring of vessels and over all cargo transfer operations in Anchorage A is exercised by the Captain of the Port, Philadelphia. The regulations of paragraphs (b)(1) and (b)(2) of this section do not apply to this anchorage.
(2) Anchorage 1 off Bombay Hook Point. On the southwest side of the channel along Liston Range, in the waters bounded by a line connecting the following points:
Latitude | Longitude
39°17′14.0″ N | 075°22′21.0″ W
39°16′55.2″ N | 075°22′50.5″ W
39°20′34.1″ N | 075°26′56.8″ W
39°20′53.5″ N | 075°26′28.0″ W
(DATUM: NAD 83)
(3) Anchorage 2 northwest of Artificial Island. On the east side of the channel along Reedy Island Range, bounded as follows: Beginning at a point bearing 105° from the northernmost point of Reedy Island, 167 yards easterly of the east edge of the channel along Reedy Island Range; thence 105°, 800 yards; thence 195°, 4,500 yards; thence 285°, 800 yards to a point (approximately latitude 39°28′58″, longitude 75°33′37″) opposite the intersection of Reedy Island and Baker Ranges; and thence 15°, 4,500 yards, to the point of beginning.
(4) Anchorage 3 southeast of Reedy Point. Southeast of the entrance to the Chesapeake and Delaware Canal at Reedy Point, in the waters bounded by a line connecting the following points:
Latitude | Longitude
39°33′09.0″ N | 075°32′38.0″ W
39°32′34.6″ N | 075°32′38.2″ W
39°31′29.0″ N | 075°33′01.0″ W
39°31′31.8″ N | 075°33′16.2″ W
39°32′14.6″ N | 075°33′08.3″ W
39°33′09.0″ N | 075°33′10.0″ W
(DATUM: NAD 83)
(5) Anchorage 4 north of Reedy Point. North of the entrance to the Chesapeake and Delaware Canal at Reedy Point, on the west side of the river, bounded as follows: Beginning at a point (approximately latitude 39°33′51″, longitude 75°33′35″) 344°58′ true, 160 yards from Chesapeake and Delaware Canal Light 2; thence 306°26′, 1,442 yards; thence 36°26′, 377 yards; thence 126°26′, 1,442 yards; thence 216°26′, 377 yards to the point of beginning.
(6) Anchorage 5 southeast of Pea Patch Island. On the northeast side of the channel along New Castle Range, bounded as follows: Beginning at latitude 39°34′28″, longitude 75°33′06″; thence 334°, 2,343 yards; thence 64°, 512 yards; thence 154°, 2,343 yards; and thence 244°, 512 yards, to the point of beginning.
(7) Anchorage 6 off Deepwater Point. East of the entrance to Christina River, in the waters bounded by a line connecting the following points:
Latitude | Longitude
39°43′00.0″ N | 075°30′20.0″ W
39°42′51.5 ″ N | 075°29′44.9″ W
39°42′05.4″ N | 075°30′25.2″ W
39°41′47.3″ N | 075°30′37.5″ W
39°41′34.7″ N | 075°30′39.9″ W
39°41′36.6″ N | 075°30′51.1″ W
(DATUM: NAD 83)
(8) Anchorage 7 off Marcus Hook. (i) On the southeast side of the channel along Marcus Hook Range, bounded by a line connecting the following points:
Latitude | Longtitude
39°49′17.254″ N | 75°22′50.0994″ W
39°48′39.984″ N | 75°23′17.238″ W
39°47′45.309″ N | 75°25′01.278″ W
39°47′43.111″ N | 75°26′00.186″ W
(DATUM: NAD 83)
(ii) A vessel that is arriving from or departing for sea and that requires an examination by public health, customs, or immigration authorities shall anchor in the preferential area of this anchorage designated for the use of vessels awaiting quarantine inspection, this area being the waters bounded by the arc of a circle with a radius of 366 yards and with the center located at:
Latitude | Longtitude
39°48′46.334″ N | 75°23′26.881″ W
(DATUM: NAD 83)
(iii) Should the remainder of the anchorage be in use, the preferential area, when available, may be used by vessels not subject to quarantine inspection.
(9) Anchorage 8 off Thompson Point. On the south side of the channel along Tinicum Range, between Thompson Point and the east side of Crab Point, in the waters bounded by a line connecting the following points:
Latitude | Longitude
39°50′52.0″ N | 075°18′23.0″ W
39°50′51.1″ N | 075°17′41.0″ W
39°50′44.5″ N | 075°17′41.6″ W
39°50′46.0″ N | 075°18′23.0″ W
(DATUM: NAD 83)
(10) Anchorage 9 near entrance to Mantua Creek. On the southeast side of the channel along Mifflin Range, bounded as follows: Beginning at a point on the southeast edge of the channel at longitude 75°14′26″; thence northeasterly along the edge of the channel to longitude 75°12′01.5″; thence 203°30′, 933 yards; thence 233°30′, 3,058 yards; and thence 263°30′, 933 yards, to the point of beginning. Vessels must not cast anchor in this anchorage in such manner as to interfere unreasonably with the passage of other vessels to and from Mantua Creek.
(11) Anchorage 10 at Naval Base, Philadelphia. On the north side of the channel along Eagle Point Range, bounded as follows: Beginning off of the southeasterly corner of Pier 1 at 39°53′07″ N., 075°10′30″ W., thence south to the to the north edge of the channel along Eagle Point Range to 39°52′58″ N., 075°10′29″ W., thence east along the edge of the channel to 39°52′56″ N., 075°09′53″ W., thence north to 39°53′07″ N., 075°09′54″ W., thence continuing west to the beginning point at 39°53′07″ N., 075°10′30″ W. These coordinates are based on WGS 84.
(12) Anchorage 11 at Gloucester. (i) East of the channel south of the Walt Whitman Bridge at Gloucester, in the waters bounded by a line connecting the following points:
Latitude | Longitude
39°54′10.0″ N | 075°07′45.0″ W
39°54′09.4″ N | 075°07′43.0″ W
39°54′03.0″ N | 075°07′41.0″ W
39°53′30.5″ N | 075°07′57.7″ W
39°53′09.6″ N | 075°08′17.0″ W
39°53′36.6″ N | 075°08′00.6″ W
(DATUM: NAD 83)
(ii) The area between Pier 124 S and 122 S, along the west side of the Delaware River, is restricted to facilitate vessel movements. The areas adjacent to working piers are restricted to facilitate the movement of vessels to and from these piers. Should the anchorage become so congested that vessels are compelled to anchor in these restricted areas, they must move immediately when another berth is available.
(13) Anchorage 12 between Gloucester and Camden. (i) East of the channel beginning north of the Walt Whitman Bridge at Gloucester and ending south of the Benjamin Franklin Bridge at Camden, bounded as follows: Beginning at a point at latitude 39°54′26.0″ N, longitude 75°07′41″ W, bounded on the west by a line perpendicular to the channel, 210 yards from the east edge of the channel, 5,536 yards north to a point at latitude 39°57′05.0″ N, longitude 75°08′04.2″ W, and then bounded by a line connecting the following points, connecting to the point of beginning:
Latitude | Longitude
39°57′04.3″ N | 075°07′57.3″ W
39°56′51.7″ N | 075°08′01.3″ W
39°56′35.5″ N | 075°08′03.1″ W
39°56′02.8″ N | 075°08′02.0″ W
39°55′34.7″ N | 075°07′54.5″ W
39°54′45.7″ N | 075°07′32.5″ W
39°54′33.8″ N | 075°07′32.9″ W
39°54′25.2″ N | 075°07′36.1″ W
(DATUM: NAD 83)
(ii) The area between No. 2 Broadway pier and No. 1 Broadway pier is restricted to facilitate vessel movements. The areas adjacent to working piers are restricted to facilitate the movement of vessels to and from these piers. Should the anchorage become so congested that vessels are compelled to anchor in these restricted areas, they must move immediately when another berth is available.
(14) Anchorage 13 at Camden. East of the channel, north of the Benjamin Franklin Bridge to Cooper Point, Camden, NJ, in the waters bounded by a line connecting the following points:
Latitude | Longitude
39°57′17.0″ N | 075°07′58.0″ W
39°57′22.3″ N | 075°07′55.9″ W
39°57′32.0″ N | 075°07′49.4″ W
39°57′39.2″ N | 075°07′39.7″ W
39°57′34.9″ N | 075°07′34.7″ W
39°57′21.2″ N | 075°07′49.8″ W
39°57′15.1″ N | 075°07′52.7″ W
(15) Anchorage 14 opposite Port Richmond. On the southeast side of the channel, north of Petty Island, bounded as follows: Beginning at a point on the southeast edge of the channel at longitude 75°05′43″; thence 163°, 248 yards; thence 253°, 1,978 yards, to the southeast edge of the channel; and thence northeasterly along the edge of the channel to the point of beginning. Vessels having a draft of less than 20 feet must anchor southwest of Pier No. 11, Port Richmond. The area off the Cities Service Oil Company wharves, Petty Island, shall be restricted to facilitate the movement of vessels to and from the wharves.
(16) Anchorage 15 off northeasterly end of Petty Island. On the southeast side of the channel, bounded as follows: Beginning at a point on the southeast edge of the channel at longitude 75°05′34.7″; thence northeasterly along the southeast edge of the channel to longitude 75°05′09.5″; thence 171°, 198 yards; thence 260°30′, 667 yards; and thence 351°, 198 yards, to the point of beginning. When necessary, this anchorage will be reserved for vessels under the custody of the United States, at which time other vessels may be required by the Captain of the Port to shift position.
(17) Anchorage 16 between Port Richmond and Five Mile Point. On the northwest side of the channel, bounded as follows: Beginning at a point on the northwest edge of the channel at longitude 75°05′35″; thence northeasterly along the edge of the channel to longitude 75°04′20″; thence 328°, 125 yards; thence 243°, 450 yards; thence 251°, 475 yards; thence 257°, 1,042 yards; thence 174°30′, 122 yards, to the point of beginning. When necessary, this anchorage will be reserved for vessels under the custody of the United States, at which time other vessels may be required by the Captain of the Port to shift position.
(18) [Reserved]
(19) Anchorage C—Cape Henlopen. All waters bound by the following points:
Latitude | Longitude
38°40′54.00″ N | 74°52′00.00″ W
38°40′56.08″ N | 74°48′51.34″ W
38°37'36.00″ N | 74°'48′30.00″ W
(DATUM: NAD 83)
(20) Anchorage D—Indian River. All waters bound by the following points:
Latitude | Longitude
38°34′56.25″ N | 74°52′19.12″ W
38°33′40.91″ N | 74°54′41.50″ W
38°31′31.08″ N | 74°55′27.96″ W
38°29′07.35″ N | 74°53′29.25″ W
38°28′56.87″ N | 74°50′28.69″ W
38°30′07.37″ N | 74°48′08.38″ W
(DATUM: NAD 83)
(b) General regulations. (1) Except in cases of great emergency, no vessel shall be anchored in Delaware Bay and River between Ship John Light and The Pennsylvania Railroad Company bridge at Delair, New Jersey, outside of the anchorage areas established in this section, or within a cable or pipe line area shown on a Government chart, or be moored, anchored, or tied up to any pier, wharf, or other vessel in such manner as to obstruct or endanger the passage of any vessel. When an emergent condition exists due to congestion in the prescribed anchorage areas in the Delaware River, the Captain of the Port may authorize the anchorage of vessels in locations other than the prescribed areas. Vessels so anchored must not be anchored within the channel limits. Any vessel anchored outside of the prescribed anchorage limits must move to a prescribed anchorage area when space becomes available.
(2) No vessel shall occupy any prescribed anchorage for a longer period than 48 hours without a permit from the Captain of the Port. Vessels expecting to be at anchor for more than 48 hours shall obtain a permit from the Captain of the Port for that purpose. No vessel in such condition that it is likely to sink or otherwise become a menace or obstruction to navigation or anchorage of other vessels shall occupy an anchorage except in an emergency, and then only for such period as may be permitted by the Captain of the Port.
(3) Whenever, in the opinion of the Captain of the Port such action may be necessary, he may require any or all vessels in any designated anchorage area to moor with two or more anchors.
(4) [Reserved]
(5) Anchors shall be placed well within the anchorage areas, so that no portion of the hull or rigging will at any time extend outside of the anchorage area.
(6) Light-draft barges using the anchorages shall be anchored away from the deeper portions of the anchorages, so as not to interfere with the anchoring of deep-draft vessels. Any barges towed in tandem to an anchorage area shall be bunched together when anchoring.
(7) Upon approval of the District Engineer, Corps of Engineers, the Captain of the Port may permit wrecking plant or other vessels legally engaged in recovering sunken property, or in laying or repairing pipe lines or cables, or plant engaged in dredging operations, to anchor in channels. Such permission is not necessary for plant engaged upon works of river and harbor improvement under the supervision of the District Engineer, but the District Engineer will notify the Captain of the Port in advance of all such proposed work.
(8) [Reserved]
(9) A vessel upon being notified to shift its position shall get under way at once or signal for a tug and shall change position as directed with reasonable promptness.
(10) Nothing in this section shall be construed as relieving any vessel or the owner or person in charge of any vessel from the penalties of law for obstructing navigation or for obstructing or interfering with range lights, or for not complying with the laws relating to lights and fog signals or other navigation laws and regulations.
(11) Annually from September 1 until December 31, additional requirements and restrictions in this paragraph for the use of anchorages defined in paragraphs (a)(7), (a)(8), and (a)(10) of this section apply.
(i) Before anchoring in Anchorage 7 off Marcus Hook, as described in paragraph (a)(8) of this section, a vessel must first obtain permission from the Captain of the Port, Philadelphia, at least 24 hours in advance of arrival. Permission to anchor will be granted on a “first-come, first-served” basis. The Captain of the Port, Philadelphia, will allow only one vessel at a time to be at anchor in Anchorage 7, and no vessel may remain within Anchorage 7 for more than 12 hours. Any vessel arriving from or departing to sea that requires an examination by the public health service, customs or immigration authorities will be directed to an anchorage for the required inspection by the Captain of the Port on a case-by-case basis.
(ii) For Anchorage 6 off Deepwater Point, as described in paragraph (a)(7) of this section, and Anchorage 9 as described in paragraph (a)(10) of this section.
(A) Any vessel 700 feet or greater in length requesting anchorage shall obtain permission from the Captain of the Port, Philadelphia, Pennsylvania, at least 24 hours in advance.
(B) Any vessel from 700 to 750 feet in length shall have one tug alongside at all times while the vessel is at anchor.
(C) Any vessel greater than 750 feet in length shall have two tugs alongside at all times while the vessel is at anchor.
(D) The Master, owner or operator of a vessel at anchor shall ensure that any tug required by this section is of sufficient horsepower to assist with necessary maneuvers to keep the vessel clear of the navigation channel.
(iii) As used in this section, Captain of the Port means the Commander of Sector Delaware Bay or any Coast Guard commissioned, warrant or petty officer who has been authorized by the Captain of the Port to act on his behalf. The Captain of the Port may be contacted by telephone at (215) 271-4807 or via VHF marine band radio, channel 16.
(c) Regulations for vessels carrying and handling explosives. (1) All vessels carrying explosives as defined in and subject to Title 49 Code of Federal Regulations, Parts 171 through 177, or on which such explosives are to be loaded, shall obtain a permit from the Captain of the Port, except as provided in paragraph (c)(5) of this section. The maximum amount of explosives for which a permit is required in 49 CFR Parts 171 through 177, which may be carried or loaded at any time by a vessel shall not exceed 800 tons, except in cases of great emergency or by special permit from the Captain of the Port. This written permit shall be obtained from the Captain of the Port before vessels carrying explosives or on which explosives are to be loaded within the weight limit specified in paragraph (c)(1) of this section, may anchor in any anchorge. Permits will not be issued for Anchorage 2 under any circumstances. Such permit may be revoked at any time. All vessels used in connection with loading, or unloading explosives shall carry written permits from the Captain of the Port, and shall show such permit whenever required by him or his representative.
(2) Vessels handling explosives shall be anchored so as to be at least 2,200 feet from any other vessel, but the number of vessels which may anchor in an anchorage at any one time shall be at the discretion of the Captain of the Port. This provision is not intended to prohibit barges or lighters from tying up alongside the vessels for the transfer of cargo.
(3) Whenever a vessel or barge not mechanically self-propelled anchors while carrying explosives or while awaiting the loading of explosives, the Captain of the Port may require the attendance of a tug upon such vessel or barge when in his judgment such action is necessary.
(4) Fishing and navigation are prohibited within an anchorage whenever occupied by an anchored vessel displaying a red flag.
(5) The District Engineer, U.S. Army Corps of Engineers, may authorize, in writing, a vessel carrying explosives for use on river and harbor works or on other work under Department of the Army permit, to anchor in or near the vicinity of such work. The Captain of the Port will prescribe the conditions under which explosives shall be stored and handled in such cases.
(6) Vessels carrying explosives or on which explosives are to be loaded, within the weight limit specified in paragraph (c)(1) of this section, shall comply with the general regulations in paragraph (b) of this section when applicable.
(7) Nothing in this section shall be construed as relieving any vessel or the owner or person-in-charge of any vessel, and all others concerned, of the duties and responsibilities imposed upon them to comply with the regulations governing the handling, loading or discharging of explosives entitled “Subchapter C—Hazardous Materials Regulations” (49 CFR Parts 171 through 177).
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967]
Editorial Note:For Federal Register citations affecting § 110.157, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.158 Baltimore Harbor, MD.
(a) Anchorage Grounds—(1) No. 1, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°15′13.51″ N | 76°34′07.76″ W
39°15′11.01″ N | 76°34′11.69″ W
39°14′52.98″ N | 76°33′52.67″ W
39°14′47.90″ N | 76°33′40.73″ W
(ii) No vessel shall remain in this anchorage for more than 12 hours without permission from the Captain of the Port.
(2) Anchorage No. 2, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°14′50.06″ N | 76°33′29.86″ W
39°14′57.53″ N | 76°33′37.74″ W
39°15′08.56″ N | 76°33′37.66″ W
39°15′15.77″ N | 76°33′28.81″ W
39°15′18.87″ N | 76°33′12.82″ W
39°15′17.71″ N | 76°33′09.09″ W
39°14′50.35″ N | 76°32′40.43″ W
39°14′45.28″ N | 76°32′48.68″ W
39°14′46.27″ N | 76°32′49.69″ W
39°14′43.76″ N | 76°32′53.63″ W
39°14′57.51″ N | 76°33′08.14″ W
39°14′55.60″ N | 76°33′11.14″ W
39°14′59.42″ N | 76°33′15.17″ W
(ii) No vessel shall remain in this anchorage for more than 72 hours without permission from the Captain of the Port.
(3) Anchorage No. 3A, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°14′15.66″ N | 76°32′53.59″ W
39°14′32.48″ N | 76°33′11.31″ W
39°14′46.27″ N | 76°32′49.69″ W
39°14′32.50″ N | 76°32′35.18″ W
39°14′22.37″ N | 76°32′43.07″ W
(ii) No vessel shall remain in this anchorage for more than 24 hours without permission from the Captain of the Port.
(4) Anchorage No. 3B, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°14′32.48″ N | 76°33′11.31″ W
39°14′46.23″ N | 76°33′25.83″ W
39°14′57.51″ N | 76°33′08.14″ W
39°14′43.76″ N | 76°32′53.63″ W
(ii) No vessel shall remain in this anchorage for more than 24 hours without permission from the Captain of the Port.
(5) Anchorage No. 3C, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°14′46.23″ N | 76°33′25.83″ W
39°14′50.06″ N | 76°33′29.86″ W
39°14′59.42″ N | 76°33′15.17″ W
39°14′55.60″ N | 76°33′11.14″ W
(ii) No vessel shall remain in this anchorage for more than 72 hours without permission from the Captain of the Port.
(6) Anchorage No. 4, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°13′52.92″ N | 76°32′29.60″ W
39°14′04.38″ N | 76°32′41.69″ W
39°14′09.35″ N | 76°32′39.89″ W
39°14′17.96″ N | 76°32′26.44″ W
39°14′05.32″ N | 76°32′13.09″ W
39°14′00.05″ N | 76°32′17.77″ W
(ii) No vessel shall remain in this anchorage for more than 24 hours without permission from the Captain of the Port.
(7) Anchorage No. 5, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°14′07.89″ N | 76°32′58.23″ W
39°13′34.82″ N | 76°32′23.66″ W
39°13′22.25″ N | 76°32′28.90″ W
39°13′21.20″ N | 76°33′11.94″ W
(ii) No vessel shall remain in this anchorage for more than 72 hours without permission from the Captain of the Port.
(8) Anchorage No. 6, general anchorage. (i) All waters of the Patapsco River, bounded by a line connecting the following points:
Latitude | Longitude
39°13′42.98″ N | 76°32′19.11″ W
39°13′20.65″ N | 76°31′55.58″ W
39°13′34.00″ N | 76°31′33.50″ W
39°14′01.95″ N | 76°32′02.65″ W
39°13′51.01″ N | 76°32′18.71″ W
(ii) No vessel shall remain in this anchorage for more than 72 hours without permission from the Captain of the Port.
(9) Anchorage No. 7, Dead ship anchorage. (i) All waters of Curtis Bay, bounded by a line connecting the following points:
Latitude | Longitude
39°13′00.40″ N | 76°34′10.40″ W
39°13′13.40″ N | 76°34′10.81″ W
39°13′13.96″ N | 76°34′05.02″ W
39°13′14.83″ N | 76°33′29.80″ W
39°13′00.40″ N | 76°33′29.90″ W
(ii) The primary use of this anchorage is to lay up dead ships. Such use has priority over other uses. Permission from the Captain of the Port must be obtained prior to the use of this anchorage for more than 72 hours.
(b) Definitions. As used in this section—
Certain dangerous cargo means certain dangerous cargo as defined in § 160.202 of this chapter.
COTP means Captain of the Port Sector Maryland—National Capital Region.
(c) General regulations. (1) Except as otherwise provided, this section applies to vessels over 20 meters long and all vessels carrying or handling certain dangerous cargo while anchored in an anchorage ground described in this section.
(2) Except in cases where unforeseen circumstances create conditions of imminent peril, or with the permission of the Captain of the Port, no vessel shall be anchored in Baltimore Harbor or the Patapsco River outside of the anchorage areas established in this section for more than 24 hours. No vessel shall anchor within a tunnel, cable or pipeline area shown on a government chart. No vessel shall be moored, anchored, or tied up to any pier, wharf, or other vessel in such manner as to extend into established channel limits. No vessel shall be positioned so as to obstruct or endanger the passage of any other vessel.
(3) Except in an emergency, a vessel that is likely to sink or otherwise become an obstruction to navigation or the anchoring of other vessels may not occupy an anchorage, unless the vessel obtains permission from the Captain of the Port.
(4) Upon notification by the Captain of the Port to shift its position, a vessel at anchor must get underway and shall move to its new designated position within two hours after notification.
(5) The Captain of the Port may prescribe specific conditions for vessels anchoring within the anchorages described in this section, including, but not limited to, the number and location of anchors, scope of chain, readiness of engineering plant and equipment, usage of tugs, and requirements for maintaining communication guards on selected radio frequencies.
(6) No vessel at anchor or at a mooring within an anchorage may transfer oil to or from another vessel unless the vessel has given the Captain of the Port the four hours advance notice required by § 156.118 of this chapter.
(7) No vessel shall anchor in a “dead ship” status (propulsion or control unavailable for normal operations) without prior approval of the Captain of the Port.
[USCG-2017-0181, 84 FR 16780, Apr. 23, 2019]
§ 110.159 Annapolis Harbor, MD.
(a) The Anchorage Grounds—(1) Naval Anchorage for Deep Draft Vessels. In the Chesapeake Bay, bounded on the north by latitude 38°58′00″; on the east by a line bearing 203° from latitude 38°58′00″, longitude 76°24′00″; on the south by latitude 38°56′30″; and on the west by a line bearing 139° from Greenbury Point Shoal Light. This anchorage is reserved for deep draft naval vessels. Berths in the area will be assigned on application to the Superintendent, U.S. Naval Academy.
(2) Middle Ground Anchorage. Beginning at a point in the Severn River 139°, 620 yards from Triton Light (located at the intersection of the northeast and southeast seawall of the Naval Academy grounds); thence easterly to a point 112°30′, 970 yards from Triton Light; thence southeasterly to a point 274°, 1,045 yards from the radio tower at the tip of Greenbury Point; thence south-southeasterly to a point 233°30′, 925 yards from the radio tower at the tip of Greenbury Point; thence west to a point 295°, 1,015 yards from Greenbury Point Shoal Light: thence northwesterly to the point of beginning.
(3) South Anchorage. In the Severn River, beginning at a point on the shoreline at Horn Point, Eastport, 168°, 1,190 yards from Triton Light; thence east to a point 294°, 1,075 yards from Greenbury Point Shoal Light; thence northwest to a point 143°, 595 yards from Triton Light; thence westerly to a point 209°, 700 yards from Triton Light; thence 180° to a point on the shoreline at Eastport. No vessel shall anchor within 100 feet of any wharf, marine railway, or other structure without the permission of the owner thereof.
(4) Naval Anchorage for Small Craft. In the Severn River, beginning at a point 80 feet off the southeast seawall of the Naval Academy bearing 132° from Triton Light; thence easterly to a point 072°30′, 285 yards from Triton Light; thence southeasterly to a point 109°, 785 yards from Triton Light; thence westerly to a point 211°, 537 yards from Triton Light; thence northwesterly to a point 45 yards off the southeast seawall of the Naval Academy bearing 214°, 535 yards from Triton Light; thence northeasterly to the point of beginning. Except in the case of emergency, no vessel shall be anchored in this area without the permission of the Superintendent, U.S. Naval Academy. Anchorages will be assigned upon request to the Superintendent, U.S. Naval Academy.
(5) Spa Creek Anchorage. In Spa Creek, those waters bounded by a line connecting the following points:
Latitude | Longtitude
38°58′37.3″ N | 76°28′48.1″ W
38°58′36.1″ N | 76°28′57.8″ W
38°58′31.6″ N | 76°29′03.3″ W
38°58′26.7″ N | 76°28′59.5″ W
Datum: NAD 83
Note:
The City Council of Annapolis has promulgated local ordinances to the control building of structures, and mooring and anchorage of vessels in anchorages (a)(3), and (a)(5). These local ordinances will be enforced by the local Harbor Master.
(b) The regulations. (1) Except in the case of emergency, no vessel shall be anchored in the area to the north and east of the Annapolis Channel bounded on the east by Greenbury Point; on the south by a line bearing 270° from the southern tip of Greenbury Point; on the west by the Annapolis Channel; on the north by the southern boundry of the cable area and the shoreline of the Government reservation and Carr Creek.
(2) Except in the case of emergency, no vessel shall be anchored in Annapolis Harbor to the westward of the dredged channel and northward of the southern boundry of the South Anchorage outside of the established anchorage areas, except in Spa Creek and the area to the southwestward of the Naval anchorage for small craft. No vessel shall be so anchored that any part of the vessel extends at any time within this area. Any vessel anchoring, under great emergency, within this area shall be placed as close to an anchorage area as practicable, and shall move away immediately after the emergency ceases.
(3) No vessel shall be anchored in the cable and pipeline area, lying between the Naval Academy and the Naval Ship Research and Development Laboratory and having the following limits: Southeastern limit, from Triton Light 072° to white “Cable Crossing” sign at the Naval Ship Research and Development Laboratory; northwestern limit, a line bearing 054° from the Capitol Dome.
(4) Except in the case of emergency, no vessel shall be anchored, without permission of the Superintendent, U.S. Naval Academy, in the Naval Academy Drill area described as follows:
That portion of the Severn River lying to the northeastward of the Naval Academy, bounded on the north by the State Highway Bridge and on the south by the northern limit of the cable and pipeline area, excluding that area off the eastern shoreline enclosed by a line bearing approximately 131° from the eastern abutment of the State Highway Bridge to the vicinity of Ferry Point. This drill area also includes the lower part of Dorseys Creek below the Naval Academy Drawbridge. Requests to anchor in this drill area shall be made to the Superintendent, U.S. Naval Academy.
(5) The restrictions in this section do not apply to the anchoring or marking by buoys of apparatus used for the purpose of taking seafood, except within the cable or pipeline area described in paragraph (b)(3) of this section.
(6) The regulations in paragraph (b) of this section shall be enforced by the Superintendent, U.S. Naval Academy, and such agencies as he may designate.
[CGFR 68-97, 34 FR 9677, June 20, 1969, as amended by CGD 05-81-15R, 47 FR 29658, 29659, July 8, 1982; CGD05-93-103, 60 FR 27696, May 25, 1995; 60 FR 45776, Sept. 1, 1995]
§ 110.166 York River, Va., naval anchorage.
(a) The anchorage grounds. Between Yorktown and the Naval Mine Depot, beginning at latitude 37°15′34″, longitude 76°31′25″; thence to latitude 37°15′25″, longitude 76°31′39.5″; thence to latitude 37°16′21.5″, longitude 76°32′46″; thence to latitude 37°17′07.5″, longitude 76°34′17″; thence to latitude 37°17′55″, longitude 76°35′14.5″; thence to latitude 37°18′05″, longitude 76°35′01″; thence to latitude 37°17′20″, longitude 76°34′07″; thence to latitude 37°16′33.5″, longitude 76°32′34″, and thence to the point of beginning.
(b) The regulations. This anchorage is reserved for the exclusive use of naval vessels and except in cases of emergency, no other vessel shall anchor therein without permission from the local naval authorities, obtained through the Captain of the Port, Norfolk, Virginia. Movement of vessels through the anchorage will not be restricted.
§ 110.168 Hampton Roads, Virginia and adjacent waters.
(a) Anchorage grounds. Unless otherwise stated, all coordinates in this section for anchorage grounds are based on North American Datum of 1983 (NAD 83).
(1) Anchorage A [Naval Anchorage]. The waters bounded by the shoreline and a line connecting the following points:
Latitude | Longitude
36°55′36.2″ N | 76°02′46.3″ W
36°57′03.3″ N | 76°03′01.4″ W
36°56′45.5″ N | 76°01′28.8″ W
36°55′55.7″ N | 76°01′35.7″ W
(2) Chesapeake Bay, Thimble Shoals Channel Anchorages—(i) Anchorage B [Naval Anchorage]. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°57′58.5″ N | 76°06′05.8″ W
36°57′11.5″ N | 76°03′00.9″ W
36°55′49.3″ N | 76°03′12.8″ W
36°56′32.3″ N | 76°06′05.8″ W
36°57′04.5″ N | 76°06′05.8″ W
36°57′09.0″ N | 76°06′23.3″ W
(ii) Anchorage C [Naval Anchorage]. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°58′55.3″ N | 76°09′40.3″ W
36°58′19.3″ N | 76°07′16.8″ W
36°57′27.5″ N | 76°07′36.3″ W
36°58′04.5″ N | 76°09′58.8″ W
(iii) Anchorage D [Naval Anchorage]. The waters bounded by the shoreline and a line connecting the following points:
Latitude | Longitude
36°55′49.5″ N | 76°10′31.6″ W
36°58′04.5″ N | 76°10′00.9″ W
36°57′31.7″ N | 76°07′53.6″ W
36°55′24.6″ N | 76°08′27.6″ W
(iv) Anchorage E [Commercial Explosives Anchorage]. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°59′59.2″ N | 76°13′45.8″ W
36°59′08.7″ N | 76°10′32.6″ W
36°58′13.5″ N | 76°10′50.6″ W
36°59′02.5″ N | 76°14′08.9″ W
(v) Explosives Handling Berth E-1 [Explosives Anchorage Berth]. The waters bounded by the arc of a circle with a radius of 500 yards and the center located at:
Latitude | Longitude
36°59′05.5″ N | 76°11′21.8″ W
(3) Hampton Roads Anchorages—(i) Anchorage F, Hampton Bar. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°59′25.5″ N | 76°20′05.8″ W
36°59′52.1″ N | 76°19′10.8″ W
36°59′25.7″ N | 76°18′47.3″ W
36°58′49.6″ N | 76°19′32.6″ W
(ii) Anchorage Berth F-1. The waters bounded by the arc of a circle with a radius of 500 yards and the center located at:
Latitude | Longitude
36°59′29.6″ N | 76°19′13.9″ W
(iii) Anchorage G, Hampton Flats (Naval Explosives Anchorage). The waters bounded by a line connecting the following points:
Latitude | Longitude
36°59′25.0″ N | 76°20′07.0″ W
36°58′49.1″ N | 76°19′33.8″ W
36°57′41.4″ N | 76°21′07.7″ W
36°57′34.6″ N | 76°21′26.7″ W
36°57′31.1″ N | 76°22′01.9″ W
36°58′07.0″ N | 76°22′03.0″ W
36°58′54.8″ N | 76°21′42.6″ W
(iv) Explosives Handling Berth G-1. The waters bounded by the arc of a circle with a radius of 500 yards and the center located at:
Latitude | Longitude
36°57′50.5″ N | 76°21′35.8″ W
(v) Explosives Handling Berth G-2. The waters bounded by the arc of a circle with a radius of 500 yards and the center located at:
Latitude | Longitude
36°58′14.5″ N | 76°21′00.3″ W
(vi) Explosives Handling Berth G-3. The waters bounded by the arc of a circle with a radius of 500 yards and with the center located at:
Latitude | Longitude
36°58′34.2″ N | 76°20′31.4″ W
(vii) Explosives Handling Berth G-4. The waters bounded by the arc of a circle with a radius of 500 yards and with the center located at:
Latitude | Longitude
36°58′54.9″ N | 76°20′03.2″ W
(viii) Anchorage H, Newport News Bar. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°57′38.8″ N | 76°24′18.5″ W
36°57′52.3″ N | 76°22′29.7″ W
36°58′07.4″ N | 76°22′01.8″ W
36°57′31.6″ N | 76°22′00.6″ W
36°57′18.7″ N | 76°24′10.1″ W
(4) James River Anchorages—(i) Anchorage I, Newport News. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°58′49.0″ N | 76°27′09.8″ W
36°58′35.9″ N | 76°26′37.2″ W
36°57′52.2″ N | 76°26′01.6″ W
36°57′31.1″ N | 76°25′33.3″ W
36°57′07.2″ N | 76°24′43.1″ W
36°56′23.1″ N | 76°24′26.8″ W
36°56′03.5″ N | 76°24′35.8″ W
36°57′54.2″ N | 76°26′40.3″ W
36°58′23.5″ N | 76°27′09.8″ W
(ii) Anchorage Berth I-1. The waters bounded by the arc of a circle with a radius of 400 yards and the center located at:
Latitude | Longitude
36°57′09.0″ N | 76°25′20.4″ W
(iii) Anchorage Berth I-2. The waters bounded by the arc of a circle with a radius of 400 yards and with the center located at:
Latitude | Longitude
36°57′23.8″ N | 76°25′46.0″ W
(iv) Anchorage J, Newport News Middle Ground. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°55′59.9″ N | 76°22′11.7″ W
36°55′59.9″ N | 76°24′00.0″ W
36°56′25.3″ N | 76°23′48.0″ W
36°57′10.2″ N | 76°24′09.9″ W
36°57′12.0″ N | 76°23′47.3″ W
36°56′38.5″ N | 76°21′39.1″ W
36°56′38.5″ N | 76°20′47.0″ W
(v) Anchorage K, Newport News Middle Ground. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°57′56.4″ N | 76°20′30.5″ W
36°57′08.5″ N | 76°20′31.0″ W
36°56′48.8″ N | 76°20′22.5″ W
36°56′45.0″ N | 76°20′32.0″ W
36°56′45.0″ N | 76°21′37.7″ W
36°57′14.1″ N | 76°23′29.1″ W
36°57′28.1″ N | 76°21′11.7″ W
(vi) Anchorage Berth K-1. The waters bounded by the arc of a circle with a radius of 400 yards and with the center located at:
Latitude | Longitude
36°57′30.5″ N | 76°20′45.3″ W
(vii) Anchorage Berth K-2. The waters bounded by the arc of a circle with a radius of 400 yards and with the center located at:
Latitude | Longitude
36°57′16.8″ N | 76°21′09.5″ W
(viii) Anchorage Berth L, Craney Island Flats. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°55′59.9″ N | 76°22′11.7″ W
36°56′38.5″ N | 76°20′45.5″ W
36°56′30.0″ N | 76°20′24.3″ W
36°56′04.2″ N | 76°20′26.2″ W
(5) Elizabeth River Anchorages. (i) Anchorage M, Port Norfolk. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°51′45.7″ N | 76°19′31.5″ W
36°51′45.8″ N | 76°19′20.7″ W
36°51′37.8″ N | 76°19′24.3″ W
36°51′32.5″ N | 76°19′31.1″ W
36°51′40.7″ N | 76°19′37.3″ W
36°51′45.7″ N | 76°19′31.5″ W
(ii) Anchorage N, Hospital Point. The waters bounded by a line connecting the following points:
Latitude | Longitude
36°51′05.4″ N | 76°18′22.4″ W
36°50′50.0″ N | 76°18′00.0″ W
36°50′36.7″ N | 76°17′52.8″ W
36°50′33.6″ N | 76°17′58.8″ W
36°50′49.3″ N | 76°18′09.0″ W
36°50′50.3″ N | 76°18′07.8″ W
36°50′56.2″ N | 76°18′12.5″ W
36°51′01.8″ N | 76°18′32.3″ W
(iii) Anchorage O, The Hague. The waters of the basin known as “The Hague”, north of the Brambleton Avenue Bridge, except for the area within 100 feet of the bridge span that provides access to and from the Elizabeth River.
(6) Anchorage Q—Quarantine Anchorage. The waters bound by a line connecting the following points, which are based on the World Geodetic System (WGS84):
Latitude | Longitude
37°05′40″ N | 076°08′12″ W
37°05′40″ N | 076°07′19″ W
37°03′46″ N | 076°05′58″ W
37°03′46″ N | 076°06′51″ W
(7) Anchorage R. The waters bound by a line connecting the following points, which are based on the World Geodetic System (WGS84):
Latitude | Longitude
37°19′10″ N | 076°05′00″ W
37°12′00″ N | 076°05′00″ W
37°09′08″ N | 076°08′19″ W
37°11′23″ N | 076°08′49″ W
37°19′10″ N | 076°05′46″ W
(b) Definitions. As used in this section—
Class 1 (explosive) materials means Division 1.1, 1.2, 1.3, and 1.4 explosives, as defined in 49 CFR 173.50.
Dangerous cargo means “certain dangerous cargo” as defined in § 160.202 of this chapter.
U.S. naval vessel means any vessel owned, operated, chartered, or leased by the U.S. Navy; any pre-commissioned vessel under construction for the U.S. Navy, once launched into the water; and any vessel under the operational control of the U.S. Navy or a Combatant Command.
(c) General regulations. (1) Except as otherwise provided, this section applies to vessels over 20 meters long and vessels carrying or handling dangerous cargo or Class 1 (explosive) materials while anchored in an anchorage ground described in this section.
(2) Except as otherwise provided, a vessel may not occupy an anchorage for more than 30 days, unless the vessel obtains permission from the Captain of the Port.
(3) Except in an emergency, a vessel that is likely to sink or otherwise become a menace or obstruction to navigation or to the anchoring of other vessels, may not occupy an anchorage, unless the vessel obtains permission from the Captain of the Port.
(4) The Captain of the Port may, upon application, assign a vessel to a specific berth within an anchorage for a specified period of time.
(5) The Captain of the Port may grant a revocable permit to a vessel for a habitual use of a berth. Only the vessel that holds the revocable permit may use the berth during the period that the permit is in effect.
(6) The Commander, USCG East District, may authorize the establishment and placement of temporary mooring buoys within a berth. Placement of a fixed structure within an anchorage may be authorized by the District Engineer, U.S. Army Corps of Engineers.
(7) If an application is for the long-term lay up of a vessel, the Captain of the Port may establish special conditions in the permit with which the vessel must comply.
(8) Upon notification by the Captain of the Port to shift its position within an anchorage, a vessel at anchor must get underway at once or signal for a tug. The vessel must move to its new location within 2 hours after notification.
(9) The Captain of the Port may prescribe specific conditions for vessels anchoring within the anchorages described in this section, including, but not limited to, the number and location of anchors, scope of chain, readiness of engineering plant and equipment, usage of tugs, and requirements for maintaining communications guards on selected radio frequencies.
(10) A vessel that does not have a sufficient crew on board to weigh anchor at any time must have two anchors in place, unless the Captain of the Port waives this requirement. Members of the crew may not be released until the required anchors have been set.
(11) No vessel at anchor or at a mooring within an anchorage may transfer oil to another vessel unless the vessel has given the Captain of the Port the four hours advance notice required by § 156.118 of this title.
(12) Barges may not anchor in the deeper portions of anchorages or interfere with the anchoring of deep-draft vessels.
(13) Barges towed in tandem to an anchorage must be nested together when anchored.
(14) Any vessel anchored or moored in an anchorage adjacent to the Chesapeake Bay Bridge Tunnel or Monitor-Merrimac Bridge Tunnel (MMBT) must be capable of getting underway within 30 minutes with sufficient power to keep free of the bridge tunnel complex.
(15) A vessel may not anchor or moor in an anchorage adjacent to the Chesapeake Bay Bridge Tunnel or Monitor-Merrimac Bridge Tunnel (MMBT) if its steering or main propulsion equipment is impaired.
(d) Regulations for vessels handling or carrying dangerous cargoes or Class 1 (explosive) materials. This paragraph applies to every vessel, except a naval vessel, handling or carrying dangerous cargoes or Class 1 (explosive) materials.
(1) Unless otherwise directed by the Captain of the Port, each commercial vessel handling or carrying dangerous cargoes or Class 1 (explosive) materials must be anchored or moored within Anchorage Berth E-1.
(2) Each vessel, including each tug and stevedore boat, used for loading or unloading dangerous cargoes or Class 1 (explosive) materials in an anchorage, must have permission issued by the Captain of the Port.
(3) The Captain of the Port may require every person having business aboard a vessel handling or carrying dangerous cargoes or Class 1 (explosive) materials while in an anchorage, other than a member of the crew, to hold a form of valid identification.
(4) Each person having business aboard a vessel handling or carrying dangerous cargoes or Class 1 (explosive) materials while in an anchorage, other than a member of the crew, must present the identification prescribed by paragraph (d)(3) of this section to any Coast Guard boarding officer who requests it.
(5) Each non-self-propelled vessel handling or carrying dangerous cargoes or Class 1 (explosive) materials must have a tug in attendance at all times while at anchor.
(6) Each vessel handling or carrying dangerous cargoes or Class 1 (explosive) materials while at anchor must display by day a red flag (Bravo flag) in a prominent location and by night a fixed red light.
(e) Regulations for Specific Anchorages—(1) Anchorages A, B, C, and D. Except for a naval vessel, military support vessel, or vessel in an emergency situation, a vessel may not anchor in Anchorages A, B, C, or D without the permission of the Captain of the Port. The Captain of the Port must consult with the Commander, Naval Amphibious Base Little Creek, before granting a vessel permission to anchor in Anchorages A, B, C, or D.
(2) Anchorage E. (i) A vessel may not anchor in Anchorage E without permission from the Captain of the Port.
(ii) The Captain of the Port must give commercial vessels priority over naval and public vessels.
(iii) The Captain of the Port may at any time revoke permission to anchor in Anchorage E issued under the authority of paragraph (e)(4)(i) of this section.
(iv) A vessel may not anchor in Anchorage Berth E-1, unless it is handling or carrying dangerous cargoes or Class 1 (explosive) materials.
(v) A vessel may not anchor within 500 yards of Anchorage Berth E-1 without the permission of the Captain of the Port, if the berth is occupied by a vessel handling or carrying dangerous cargoes or Class 1 (explosive) materials.
(3) Anchorage F. A vessel having a draft less than 45 feet may not anchor in Anchorage F without the permission of the Captain of the Port. No vessel may anchor in Anchorage F for a longer period than 72 hours without permission from the Captain of the Port. Vessels expecting to be at anchor for more than 72 hours must obtain permission from the Captain of the Port.
(4) Anchorage G. (i) Except for a naval vessel, a vessel may not anchor in Anchorage G without the permission of the Captain of the Port.
(ii) When handling or transferring Class 1 (explosive) materials in Anchorage G, naval vessels must comply with Department of Defense Ammunition and Explosives Safety Standards, or the standards in this section, whichever are the more stringent.
(iii) When barges and other vessels are berthed at the Ammunition Barge Mooring Facility, located at latitude 36°58′34″ N, longitude 76°21′12″ W., no other vessel, except a vessel that is receiving or offloading Class 1 (explosive) materials, may anchor within 1,000 yards of the Ammunition Barge Mooring Facility. Vessels transferring class 1 (explosive) materials must display by day a red flag (Bravo flag) in a prominent location and by night a fixed red light.
(iv) Whenever a vessel is handling or transferring Class 1 (explosive) materials while at anchor in Anchorage G, no other vessel may anchor in Anchorage G without the permission of the Captain of the Port. The Captain of the Port must consult with the Commander, Naval Station Norfolk, before granting a vessel permission to anchor in Anchorage G.
(v) A vessel located within Anchorage G may not handle or transfer Class 1 (explosive) materials within 400 yards of Norfolk Harbor Entrance Reach.
(vi) A vessel may not handle or transfer Class 1 (explosive) materials within 850 yards of another anchored vessel, unless the other vessel is also handling or transferring Class 1 (explosive) materials.
(vii) A vessel may not handle or transfer Class 1 (explosive) materials within 850 yards of Anchorage F or H.
(5) Anchorage I: Anchorage Berths I-1 and I-2. A vessel that is 500 feet or less in length or that has a draft of 30 feet or less may not anchor in Anchorage Berth I-1 or I-2 without the permission of the Captain of the Port.
(6) Anchorage K: Anchorage Berths K-1 and K-2. A vessel that is 500 feet or less in length or that has a draft of 30 feet or less may not anchor in Anchorage Berth K-1 or K-2 without the permission of the Captain of the Port.
(7) Anchorage N. Portions of this anchorage are a special anchorage area under § 110.72aa of this part during marine events regulated under § 100.501 of this chapter.
(8) Anchorage O. (i) A vessel may not anchor in Anchorage O unless it is a recreational vessel.
(ii) No float, raft, lighter, houseboat, or other craft may be laid up for any reason in Anchorage O without the permission of the Captain of the Port.
(9) Anchorage Q: Quarantine Anchorage. (i) A vessel that is arriving from or departing for sea and that requires an examination by public health, customs, or immigration authorities shall anchor in Anchorage Q. Vessels not needing examination may use Anchorage Q at any time.
(ii) Every vessel using Anchorage Q must be prepared to move promptly under its own power to another location when directed by the Captain of the Port, and must promptly vacate Anchorage Q after being examined and released by authorities.
(iii) Any non-self-propelled vessel using Anchorage Q must have a tugboat in attendance while undergoing examination by quarantine, customs, or immigration authorities, except with the permission of the Captain of the Port.
(10) Anchorage R. (i) No vessel using Anchorage R may conduct oil or hazardous material transfer operations subject to 33 CFR part 156 except with permission of the COTP.
(ii) Any non-self-propelled vessel using Anchorage R must have a towing vessel in attendance except with permission of the COTP not to have a towing vessel in attendance.
[CGD05-04-043, 70 FR 29955, May 25, 2005, as amended by USCG-2008-0041, 73 FR 5746, Jan. 31, 2008; USCG-2005-21869, 80 FR 5330, Jan. 30, 2015; USCG-2015-1118, 85 FR 31978, May 28, 2020]
§ 110.170 Cape Fear, NC.
(a) The anchorage grounds. All coordinates in this section are based on the World Geodetic System (WGS 84).
(1) Anchorage A. The corner coordinates of the anchorage are:
Table 1 to Paragraph (a)(1)
Latitude | Longitude
33°47′59.09″ N | 78°14′58.67″ W
33°47′59.09″ N | 78°06′24.74″ W
33°46′01.22″ N | 78°06′24.74″ W
33°46′01.22″ N | 78°14′58.67″ W
(2) Anchorage B. Explosives Anchorage. The corner coordinates of the anchorage follow:
Table 2 to Paragraph (a)(2)
Latitude | Longitude
33°47′59.09″ N | 78°17′14.00″ W
33°47′59.09″ N | 78°14′58.67″ W
33°46′01.22″ N | 78°14′58.67″ W
33°46′01.22″ N | 78°17′14.00″ W
(b) Definitions. As used in this section—
Cargoes of particular hazard means “cargo of particular hazard” as defined in § 126.3 of this title.
Class 1 (explosive) materials means Division 1.1, 1.2, 1.3, and 1.4 explosives, as defined in 49 CFR 173.50.
Dangerous cargo means “certain dangerous cargo” as defined in § 160.204 of this title.
U.S. naval vessel means any vessel owner, operated, chartered, or leased by the U.S. Navy; and any vessel under the operational control of the U.S. Navy or Combatant Command.
(c) General regulations. (1) Vessels in the Atlantic Ocean near Cape Fear River Inlet awaiting berthing space within the Port of Wilmington shall only anchor within the anchorage grounds defined and established in paragraph (a) of this section, except in cases of emergency.
(2) Vessels anchoring under circumstances of emergency outside the anchorage areas shall be shifted to new positions within the anchorage grounds immediately after the emergency ceases.
(3) Vessels may anchor anywhere within the anchorage grounds provided such anchoring does not interfere with the operations of any other vessel at anchorage; except a vessel may not anchor within 1,500 yards of a vessel carrying or handling dangerous cargoes, cargoes of a particular hazard, or Class 1 (explosive) materials. Vessels shall lie at anchor with as short of a chain or cable as conditions permit.
(4) Prior to entering the anchorage grounds, all vessels must notify the Coast Guard Captain of the Port Sector North Carolina (COTP) via VHF-FM channel 16.
(5) No vessel may anchor within the anchorage grounds for more than 72 hours without the prior approval of the COTP. To obtain this approval, contact the COTP via VHF-FM channel 16.
(6) The COTP may close the anchorage grounds and direct vessels to depart the anchorage during periods of severe weather or at other times as deemed necessary in the interest of port safety or security.
(7) The COTP may prescribe specific conditions for vessels anchoring within the anchorage grounds, including but not limited to, the number and location of anchors, scope of chain, readiness of engineering plant and equipment, usage of tugs, and requirements for maintaining communications guards on selected radio frequencies.
(d) Regulations for vessels handling or carrying dangerous cargoes, cargoes of a particular hazard, or Class 1 (explosive) materials. This paragraph applies to every vessel, except U.S. naval vessels, handling or carrying dangerous cargoes, cargoes of a particular hazard, or Class 1 (explosive) materials.
(1) Unless otherwise directed by the Captain of the Port, each commercial vessel handling or carrying dangerous cargoes, cargoes of a particular hazard, or Class 1 (explosive) materials must be anchored within Anchorage B of paragraph (a)(2) of this section.
(2) Vessels requiring the use of Anchorage B of paragraph (a)(2) of this section must display by day a red flag (Bravo flag) in a prominent location and by night a fixed red light. In lieu of a fixed red light, by night a red flag may be illuminated by spotlight.
[USCG-2020-0216, 87 FR 36768, June 21, 2022]
§ 110.173 Port of Charleston, SC.
(a) The anchorage grounds—(1) Commercial Anchorage A. This anchorage is located adjacent to the western edge of Folly Island Channel and southwest of Rebellion Reach and is bounded by the following coordinates:
32°45′34″ N., 79°52′12″ W.; to 32°46′17″ N., 79°53′21″ W.; to 32°45′51″ N., 79°53′23″ W.; to 32°45′34″ N., 79°52′55″ W.; thence back to 32°45′34″ N., 79°52′12″ W.
(2) Commercial Anchorage B. This anchorage is located adjacent to the south side of South Channel and bounded by the following coordinates:
32°45′28″ N., 79°53′40″ W.; to 32°45′28″ N., 79°54′46″ W.; to 32°45′19″ N., 79°54′46″ W.; to 32°45′12″ N., 79°54′06″ W.; to 32°45′16″ N., 79°53′40″ W.; thence back to 32°45′28″ N., 79°53′40″ W.
(3) Commercial Anchorage C. This anchorage is located 1800 yards, 118° true from St. Michaels Church Spire and has a diameter of 500 yards. Vessels using this anchorage must anchor in the center.
(4) Commercial Anchorage D. This anchorage is located 51°30′ true, 1375 yards from St. Michaels Church Spire and has a diameter of 1400 feet. The use of this anchorage is limited to loaded vessels for a period of not more than 24 hours.
(b) The regulations. (1) Except in cases of great emergency, no vessel shall be anchored in the main ship channels as defined by broken lines marking their boundaries on NOAA Chart 11524. Vessels must be anchored in such a way as not to interfere with the free navigation of channels in the port, including Cooper, Ashley, Wando Rivers, and Town Creek, nor to obstruct the approach to any pier or entrance to any slip, nor to impede the movement of any vessel or craft.
(2) Vessels using the anchorages opposite the eastern waterfront of Charleston shall place their anchors as near as possible in the center of the anchorage. Vessels not using a designated commercial anchorage shall not place their anchors within the main ship channels, nor shall be so anchored as to swing within 400 feet of any wharf or pier on the eastern waterfront of Charleston. Vessels may be so anchored as to swing into the main ship channels only if they are so placed with reference to the customary winds, tides, and currents of the harbor, as to swing only during slack water, and that during this period there shall remain in the waters adjacent to the channel an area of sufficient depth as to permit the safe passage of loaded vessels.
(3) No vessel may anchor within the designated anchorages for more than 72 hours without the prior approval of the Captain of the Port.
(4) No vessel may anchor unless it maintains a bridge watch, guards and answers Channel 16 FM, and maintains an accurate position plot.
(5) If any anchored vessel is so close to another that a collision is probable, each vessel must communicate with the other vessel and the Captain of the Port on Channel 16 FM and shall act to eliminate the close proximity situation.
(6) No vessel may anchor unless it maintains the capability to get underway within 4 hours.
(7) No vessel may anchor in a “dead ship” status (propulsion or control unavailable for normal operations) without the prior approval of the Captain of the Port.
(8) Dragging of anchors in or across main ship channels and cable areas is prohibited.
(9) Vessels which, through force of great emergency, are anchored contrary to the foregoing regulations in this section shall be shifted to new berths in accordance with such regulations at the earliest opportunity.
(10) A vessel, upon notification from the Captain of the Port to shift its position in anchorage grounds must get underway at once or signal for a tug, and must change position as directed with reasonable promptness.
(11) No vessel may conduct lightering operations in an anchorage without permission from the Captain of the Port.
(12) When the use of an anchorage is required by naval vessels, the vessels anchored therein shall move when the Captain of the Port directs them.
(13) Nothing in this section shall be construed as relieving the owner or person in charge of any vessel from the penalties of law for obstructing navigation, or for obstructing or interfering with range lights, or for not complying with the navigation laws in regard to lights, fog signals, etc.
[CGD7 83-15, 49 FR 26587, June 28, 1984]
§ 110.179 Skidaway River, Isle of Hope, Ga.
(a) The anchorage ground. An area in Skidaway River beginning at a point on the mean low water line 400 feet south of Brady Boat Works, thence 76°30′, 300 feet to a buoy; thence 152°30′, 900 feet to a buoy; thence 251°00′, 450 feet to the mean low water line at Wymberly Yacht Club dock.
(b) The regulations. (1) Except in cases of great emergency, no vessels shall anchor in Skidaway River between the north end of Barbee's dock and southward to Day Marker 48 except in the anchorage area hereby defined and established: Provided, however, That vessels may moor to any lawfully constructed wharf.
(2) Except in cases of great emergency, no vessel shall be anchored where it can swing within 50 feet of any lawfully constructed wharf or within 50 feet of the mean low water line, nor shall any vessel be so anchored that any portion of the hull or rigging shall at any time extend outside the boundary of the anchorage area.
(3) Any vessel anchoring under circumstances of great emergency outside the anchorage area should be placed in such a position as not to interfere with the free navigation of the channel nor obstruct the approach to any lawfully constructed wharf nor impede the movement of any boat, and shall move away immediately after the emergency ceases or upon notification of the District Commander.
(4) No vessels with an overall length greater than 65 feet will use the anchorage area except in cases of great emergency.
(5) Vessels operating within the anchorage area will not exceed a speed of five (5) miles per hour.
§ 110.182 Atlantic Ocean off Fort George Inlet, near Mayport, Fla.
(a) The Anchorage areas—(1) Anchorages for aircraft carriers and other deep draft vessels. Four circular areas each with a radius of 600 yards and with their centers located at: “A”—latitude 30°25′35″, longitude 81°21′23″; “B”—latitude 30°26′13″, longitude 81°21′13″; “C”—latitude 30°26′19″, longitude 81°20′27″; “D”—latitude 30°26′55″, longitude 81°20′47″.
(2) Anchorages for destroyers and other ships of similar size. Six circular areas each with a radius of 300 yards and with their centers located at: “1”—latitude 30°24′38″; longitude 81°21′57″; “2”—latitude 30°24′57″, longitude 81°21′58″; “3”—latitude 30°24′56″, longitude 81°21′38″; “4”—latitude 30°25′13″, longitude 81°22′05″; “5”—latitude 30°25′13″, longitude 81°21′43″; “6”—latitude 30°25′07″, longitude 81°21′24″.
(3) Explosives anchorage. The circular area “A” described in paragraph (a)(1) of this section is also designated as an explosives anchorage for use during periods when ammunition must be handled outside the limits of the U.S. Naval Station, Mayport, Fla.
(b) The regulations for all designated areas. (1) Usage of these areas by naval vessels shall predominate only when necessary for military requirements; at such times other vessels shall remain clear of the areas.
(2) Prudent assignment of the anchorage areas shall be made by the Commanding Officer, U.S. Naval Station, Mayport, Fla.
(c) Additional regulations for Explosives Anchorage Area “A”. (1) When occupied by a vessel handling explosives, no other vessel may enter the area unless authorized by the enforcing agency.
(2) Only one vessel handling explosives may anchor in the area at one time. A patrol craft shall be utilized to assure that other vessels remain clear when explosives are exposed or being transferred to and from the anchorage.
(3) No more than 500,000 pounds net high explosives or equivalent may be exposed in the area at any one time.
(d) The regulations in this section shall be enforced by the Commanding Officer, U.S. Naval Station, Mayport, Fla., or other agencies that he may designate.
§ 110.183 St. Johns River, Florida.
(a) The anchorage grounds—(1) Anchorage A. (Upper Anchorage) The Anchorage is established within the following coordinates, the area enclosed by a line starting at the south shore westerly of the entrance to Miller Creek at
30°18′43.8″ N, 081°38′15.0″ W; thence to 30°18′52.8″ N, 081°38′15.0″ W; thence to 30°18′47.6″ N, 081°37′47.6″ W; thence to 30°18′55.0″ N, 081°37′29.0″ W; thence to 30°19′06.0″ N, 081°37′27.0″ W; thence to 30°19′06.0″ N, 081°37′02.0″ W; thence to 30°19′01.2″ N, 081°37′02.0″ W; thence returning to the point of beginning.
(2) Anchorage B. (Lower Anchorage) The Anchorage is established within the following coordinates, the area enclosed by a line starting at a point on the eastern shore of the river at ‘Floral Bluff’ at
30°21′00.0″ N, 081°36′41.0″ W; thence to
30°20′00.0″ N, 081°37′03.0″ W; thence to
30°21′00.0″ N, 081°37′06.0″ W; thence to
30°21′50.0″ N, 081°36′56.0″ W; thence to
30°21′54.0″ N, 081°36′48.0″ W; thence returning to the point of beginning.
(b) The regulations. (1) Except in cases of emergency, only vessels meeting the conditions and restrictions of this paragraph will be authorized by the Captain of the Port to anchor in the St. Johns River, as depicted on NOAA chart 11491, between the entrance buoy (STJ) and the Main Street Bridge (in position 30°19′20″ N, 81°39′32″ W). Vessels unable to meet any of the following conditions and restrictions must obtain specific authorization from the Captain of the Port prior to anchoring in Anchorage A or B.
(2) All vessels intending to enter and anchor in Anchorage A or B shall notify the Captain of the Port prior to entering.
(3) Anchorages A and B are temporary anchorages. Additionally, Anchorage B is used as a turning basin. Vessels may not anchor for more than 24 hours in either anchorage without specific written authorization from the Captain of the Port.
(4) All vessels at anchor must maintain a watch on VHF-FM channels 13 and 16 by a person fluent in English, and shall make a security broadcast on channel 13 upon anchoring and every 4 hours thereafter.
(5) Anchorage A is restricted to vessels less than 250 feet in length.
(6) Anchorage B is restricted to vessels with a draft of 24 feet or less, regardless of length.
(7) Any vessel transferring petroleum products within Anchorage B shall have a pilot or Docking Master aboard, and employ sufficient assist tugs to assure the safety of the vessel at anchor and any vessels transiting the area.
(8) Any vessel over 300 feet in length within Anchorage B shall have a Pilot or Docking Master aboard, and employ sufficient assist tugs to assure the safety of the vessel at anchor and any vessels transiting the area.
[CGD07-93-035, 60 FR 14220, Mar. 16, 1995, as amended by CGD07-99-023, 64 FR 42279, Aug. 4, 1999]
§ 110.184 Atlantic Ocean, Offshore Jacksonville, FL.
(a) Location. All waters of the Atlantic Ocean encompassed within a radius of 1,400 feet of the following coordinates based on North American Datum 1983:
(1) Anchorage Ground 1 with a center point in position 30°26″48.6′ N, 81°17″14.9′ W.
(2) Anchorage Ground 2 with a center point in position 30°26″20.5′ N, 81°17″30.8′ W; and
(3) Anchorage Ground 3 with a center point in position 30°26″20.2′ N, 81°16″57.8′ W.
(b) The regulations. (1) Commercial vessels in the Atlantic Ocean near the Port of Jacksonville desiring to anchor must anchor only within the anchorage area defined and established in paragraph (a) of this section, except in cases of emergency.
(2) All vessels within the designated anchorage area must maintain a 24-hour bridge watch by a licensed or credentialed deck officer proficient in English, monitoring VHF-FM channel 16. This individual must confirm that the ship's crew performs frequent checks of the vessel's position to ensure the vessel is not dragging anchor.
(3) Vessels may anchor anywhere within the designated anchorage area, provided that: Such anchoring does not interfere with the operations of any other vessels currently at anchorage; and all anchor and chain or cable is positioned in such a manner to preclude dragging.
(4) No vessel may anchor in a “dead ship” status (that is, propulsion or control unavailable for normal operations) without the prior approval of the Captain of the Port (COTP). Vessels which are planning to perform main propulsion engine repairs or maintenance, must immediately notify the COTP on VHF-FM Channel 22A. Vessels must also report marine casualties in accordance with 46 CFR 4.05-1.
(5) No vessel may anchor within the designated anchorage for more than 72 hours without the prior approval of the COTP. To obtain this approval, contact the COTP on VHF-FM Channel 22A.
(6) The COTP may close the anchorage area and direct vessels to depart the anchorage during periods of adverse weather or at other times as deemed necessary in the interest of port safety or security.
(7) Commercial vessels anchoring under emergency circumstances outside the anchorage area must shift to new positions within the anchorage area immediately after the emergency ceases.
[USCG-2016-0897, 85 FR 67280, Oct. 22, 2020]
§ 110.185 Atlantic Ocean, off the Port of Palm Beach, FL.
(a) The anchorage grounds—(1) Anchorage A. The waters lying within an area bounded by a line beginning at latitude 26°50′00″ N., longitude 80°01′12″ W.; thence westerly to latitude 26°50′00″ N., longitude 80°01′30″ W.; thence southerly to latitude 26°47′30″ N., longitude 80°01′30″ W.; thence easterly to latitude 26°47′30″ N., longitude 80°01′12″ W.; and thence northerly to the point of beginning.
(2) Anchorage B. The waters lying within an area bounded by a line beginning at latitude 26°45′06″ N., longitude 80°01′12″ W.; thence westerly to latitude 26°45′06″ N., longitude 80°01′42″ W.; thence southerly to latitude 26°43′48″ N., longitude 80°01′42″ W.; thence easterly to latitude 26°43′48″ N., longitude 80°01′12″ W.; and thence northerly to the point of beginning.
(b) The regulations. (1) Vessels in the Atlantic Ocean near Lake Worth Inlet awaiting berthing space at the Port of Palm Beach, shall only anchor within the anchorage areas hereby defined and established, except in cases of great emergency.
(2) Vessels anchoring under circumstances of great emergency outside the anchorage areas shall be shifted to new positions within the anchorage areas immediately after the emergency ceases.
[CGD 7-85-10, 51 FR 11726, Apr. 7, 1986]
§ 110.186 Port Everglades, Florida.
(a) The anchorage grounds. The anchorage grounds, the center of which is located approximately two and one half miles northeast of the entrance to Port Everglades, is an area bounded by a line connecting points with the following North American Datum 83 coordinates:
Latitude | Longitude
26-08′26.934″ N | 080-04′28.240″ W
26-08′08.560″ N | 080-04′16.158″ W
26-07′56.000″ N | 080-04′17.486″ W
26-07′56.000″ N | 080-02′42.623″ W
26-07′19.500″ N | 080-02′53.153″ W
26-07′19.500″ N | 080-04′28.800″ W
26-06′35.160″ N | 080-04′28.800″ W
26-06′35.160″ N | 080-04′38.694″ W
26-08′26.934″ N | 080-04′28.240″ W
(b) The regulations. (1) Commercial vessels in the Atlantic Ocean in the vicinity of Port Everglades shall anchor only within the anchorage area hereby defined and established, except in cases of emergency.
(2) Prior to entering the anchorage area, all vessels shall notify the Coast Guard Captain of the Port, via the Port Everglades Harbormaster, on VHF-FM Channel 14.
(3) All vessels within the designated anchorage area shall maintain a 24-hour bridge watch by a licensed or credentialed deck officer proficient in English, monitoring VHF-FM channel 16. This individual shall confirm that the ship's crew performs frequent checks of the vessel's position to ensure the vessel is not dragging anchor.
(4) Vessels may anchor anywhere within the designated anchorage area provided that: such anchoring does not interfere with the operations of any other vessels currently at anchorage; and all anchor and chain or cable is positioned in such a manner to preclude dragging over reefs.
(5) No vessel may anchor in a “dead ship” status (i.e. propulsion or control unavailable for normal operations) without the prior approval of the Captain of the Port. Vessels experiencing casualties such as a main propulsion, main steering or anchoring equipment malfunction or which are planning to perform main propulsion engine repairs or maintenance, shall immediately notify the Coast Guard Captain of the Port via Coast Guard Sector Miami on VHF-FM Channel 16.
(6) No vessel may anchor within the designated anchorage for more than 72 hours without the prior approval of the Captain of the Port. To obtain this approval, contact the Coast Guard Captain of the Port, via the Port Everglades Harbor Master, on VHF-FM Channel 14.
(7) The Coast Guard Captain of the Port may close the anchorage area and direct vessels to depart the anchorage during periods of adverse weather or at other times as deemed necessary in the interest of port safety or security.
(8) Commercial vessels anchoring under emergency circumstances outside the anchorage area shall shift to new positions within the anchorage area immediately after the emergency ceases.
(9) Whenever the maritime or commercial interests of the United States so require, the Captain of the Port, U.S. Coast Guard, Miami, Florida, may direct relocation of any vessel anchored within the anchorage area. Once directed, such vessel must get underway at once or signal for a tug, and must change position as directed.
[CGD 07-91-060, 58 FR 36356, July 7, 1993, as amended by CGD 07-99-003, 64 FR 20177, Apr. 26, 1999; USCG-2006-25556, 72 FR 36328, July 2, 2007; USCG-2007-0036, 73 FR 6610, Feb. 5, 2008; USCG-2006-24371, 74 FR 11212, Mar. 16, 2009]
§ 110.188 Atlantic Ocean off Miami and Miami Beach, Fla.
(a) The anchorage areas—(1) Anchorage A. All area of the Atlantic Ocean, encompassed by a line connecting the points of the following North America Datum 83 coordinates:
Latitude | Longitude
25°47′57.687″ N. | 080°05′37.225″ W.
25°47′57.341″ N. | 080°05′26.466″ W.
25°46′31.443″ N. | 080°05′27.069″ W.
25°46′31.557″ N. | 080°05′37.868″ W.
(2) Anchorage B. All area of the Atlantic Ocean, encompassed by a line connecting the points of the following North America Datum 83 coordinates:
Latitude | Longitude
25°48′13.841″ N. | 080°04′59.155″ W.
25°48′04.617″ N. | 080°04′04.582″ W.
25°46′32.712″ N. | 080°04′28.387″ W.
25°46′43.770″ N. | 080°05′02.360″ W.
(b) The regulations. (1) Vessels in the Atlantic Ocean in the vicinity of Port of Miami must anchor only within the anchorage areas hereby defined and established, except in cases of emergency.
(2) Prior to entering the anchorage areas, all vessels must notify the Coast Guard Captain of the Port via VHF-FM channel 16.
(3) All vessels within the designated anchorages must maintain a 24-hour bridge watch by a licensed or credentialed deck officer proficient in English, monitoring VHF-FM channel 16. This individual must confirm that the ship's crew performs frequent checks of the vessel's position to ensure the vessel is not dragging anchor.
(4) Vessels may anchor anywhere within the designated anchorage areas provided that: Such anchoring does not interfere with the operations of any other vessels currently at anchorage; and all anchor and chain or cable is positioned in such a manner to preclude dragging over reefs.
(5) No vessel may anchor in a “dead ship” status (that is, propulsion or control unavailable for normal operations) without the prior approval of the Captain of the Port. Vessels experiencing casualties, such as main propulsion, main steering, or anchoring equipment malfunction, or which are planning to perform main propulsion engine repairs or maintenance, must immediately notify the Coast Guard Captain of the Port via Coast Guard Sector Miami on VHF-FM channel 16.
(6) No vessel may anchor within the designated anchorages for more than 72 hours without the prior approval of the Captain of the Port. To obtain this approval, contact the Coast Guard Captain of the Port via VHF-FM channel 16.
(7) The Coast Guard Captain of the Port may close the anchorage areas and direct vessels to depart the anchorage during periods of adverse weather or at other times as deemed necessary in the interest of port safety or security.
(8) Commercial vessels anchoring under emergency circumstances outside the anchorage areas must shift to new positions within the anchorage areas immediately after the emergency ceases.
(9) Whenever the maritime or commercial interests of the United States so require, the Captain of the Port, U.S. Coast Guard, Miami, Florida, may direct relocation of any vessel anchored within the anchorage areas. Once directed, such vessel must get underway at once or signal for a tug, and must change position as directed.
[USCG-2015-0729, 82 FR 27775, June 19, 2017]
§ 110.189a Key West Harbor, Key West, Fla., naval explosives anchorage area.
(a) The anchorage ground. A circular area with its center at latitude 24°30′50.6″, longitude 81°50′31.6″ with a radius of 300 yards, for use for ammunition exceeding the prescribed limits for pier-side handling.
(b) The regulations. (1) When occupied by a vessel handling explosives, no other vessel may enter the area unless authorized by the enforcing agency.
(2) Only one vessel handling explosives may anchor in the area at one time.
(3) No more than 300,000 pounds net of high explosives or equivalent may be handled in the area at any one time.
(4) The regulations in this section shall be enforced by the Commander, U.S. Naval Base, Key West, Fla., and any other agencies he may designate.
§ 110.190 Tortugas Harbor, in vicinity of Garden Key, Dry Tortugas, Fla.
(a) The anchorage grounds. All of Bird Key Harbor, southwest of Garden Key, bounded by the surrounding reefs and shoals and, on the northeast, by a line extending from Fort Jefferson West Channel Daybeacon 2 to Fort Jefferson West Channel Daybeacon 4, thence to Fort Jefferson West Channel Daybeacon 6, and thence to Fort Jefferson West Channel Daybeacon 8.
(b) The regulations. Except in cases of emergency involving danger to life or property, no vessel engaged in commercial fishing or shrimping shall anchor in any of the channels harbors, or lagoons in the vicinity of Garden Keys, Bush Key, or the surrounding shoals, outside of Bird Key Harbor.
§ 110.193 Tampa Bay, Fla.
(a) The anchorage grounds—(1) Explosives anchorage east of Mullet Key. A rectangular area in Tampa Bay, approximately 4,459 yards long and 1,419 yards wide, beginning at latitude 27°38′30″, longitude 82°39′09″, and extending northeasterly to latitude 27°39′48″, longitude 82°37′15″; thence southeasterly to latitude 27°39′17″, longitude 82°36′46″; thence southwesterly to latitude 27°37′52″, longitude 82°38′38″; thence northwesterly to the point of beginning.
(2) Temporary explosives anchorage south of Interbay Peninsula. Beginning at a point bearing 107°, 1,750 yards from Cut “F” Range Front Light; thence to a point bearing 125°, 2,050 yards, from Cut “F” Range Front Light; thence to a point bearing 180°, 1,725 yards, from Cut “F” Range Front Light; thence to a point bearing 222°, 2,180 yards, from Cut “F” Range Front Light; thence to a point bearing 251°, 1,540 yards, from Cut “F” Range Front Light; and thence to the point of beginning.
(3) Temporary explosives anchorage off Port Tampa. A circular area with a radius of 200 yards with the point at latitude 27°50′22″, longitude 82°34′15″.
(4) Quarantine Anchorage. Southeast of the temporary explosive anchorage, beginning at a point bearing 97° true, 4,370 yards, from Cut “F” Range Front Light; thence to a point bearing 113°30′, 5,370 yards, from Cut “F” Range Front Light; thence to a point bearing 161°30′, 3,770 yards, from Cut “F” Range Front Light; thence to a point bearing 163°30′, 2,070 yards, from Cut “F” Range Front Light; thence to the point of beginning.
(5) Barge Fleeting Area, Hillsborough Bay. Located 400 feet west of Cut “D” Channel at a point beginning at latitude 27°54′34″, longitude 82°26′35″; thence northerly 1,000 feet to latitude 27°54′43″, longitude 82°26′40″; thence westerly 500 feet to latitude 27°54′41″, longitude 82°26′45″; thence southerly 1,000 feet to latitude 27°54′32″, longitude 82°26′40″; thence easterly 500 feet to the point of beginning.
Note:
This area is reserved for transient barges only. Barges shall not occupy this anchorage for a period longer than 96 hours unless permission is obtained from the Captain of the Port for this purpose.
(b) The regulations. (1) The explosives anchorage east of Mullet Key shall be used by vessels awaiting loading or unloading at Port Tampa that have explosives actually on board and where the duration of anchorage will exceed 72 hours.
(2) The temporary explosives anchorages south of Interbay Peninsula and off Port Tampa shall be used for vessels engaged in loading explosives when the duration of the anchorage is less than 72 hours.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGFR 69-62, 34 FR 11582, July 15, 1969; 34 FR 12255, July 15, 1969]
§ 110.193a St. Joseph Bay, Fla.
(a) The anchorage grounds—(1) Explosives Anchorage Area 1. A rectangular area 3,000 yards long by 700 yards wide beginning at a point 1,350 yards west of U.S. Highway 98 Bridge over Gulf County Canal. The area is parallel to and 450 yards northeast of the north entrance channel to Port St. Joe, Florida.
(2) Explosives Anchorage Area 2. A circular area with a 500-yard radius around a center point located at latitude 29°47′30″; longitude 85°21′30″, 3,100 yards southeast of FW South Channel Light and 5,250 yards south of FW North Channel Light, in St. Joseph Bay, Port St. Joe, Florida.
(b) The regulations. (1) The explosives anchorage areas shall be used as temporary anchorage for vessels engaged in loading and unloading explosives at the port of Port St. Joe, Florida, when the duration of the anchorage period is less than 96 hours.
(2) No vessel shall occupy this anchorage without obtaining a permit from the Captain of the Port.
§ 110.194 Mobile Bay, Ala., at entrance.
(a) The anchorage grounds. The waters within a radius of 750 yards from a point located 1,000 yards true north from Fort Morgan Light.
(b) The regulations. (1) This anchorage shall be used by vessels loading or discharging high explosives. It shall also be used by vessels carrying dangerous or inflammable cargoes requiring an anchorage. It may be used for a general anchorage when not required for vessels carrying explosives or dangerous or inflammable cargoes.
(2) No vessel shall occupy this anchorage without obtaining a permit from the Captain of the Port.
§ 110.194a Mobile Bay, Ala., and Mississippi Sound, Miss.
(a) The anchorage grounds. (1) The waters of lower Mobile Bay, near Cedar Point, within an area bounded on the north by latitude 30°21′00″, on the east by longitude 88°05′00″, on the south by latitude 30°20′00″, and on the west by longitude 88°06′00″.
(2) The waters of Mississippi Sound, south of Biloxi, within an area bounded on the north by latitude 30°20′00″, on the east by longitude 88°54′00″, on the south by latitude 30°19′00″, and on the west by longitude 88°55′00″.
(b) The regulations. (1) The anchorages are exclusively for the use of unmanned barges, canal boats, scows, and other nondescript vessels. Such craft shall be so anchored that they will not at any time extend outside the limits of the anchorages.
(2) In emergencies or whenever maritime or commercial interests of the United States so require, the Captain of the Port is authorized to shift the position of any craft in the anchorages.
(3) Whenever in the opinion of the Captain of the Port, such action may be necessary, any or all craft in these anchorages may be required to be moored with two or more anchors.
(4) No vessel shall be navigated within the anchorages at a speed exceeding six knots.
§ 110.194b Mississippi Sound and Gulf of America, near Petit Bois Island, Miss.
(a) The anchorage grounds—(1) Explosives Anchorage Area No. 1. A circular area with a one-half mile radius with its center located at latitude 30°14′09″, longitude 88°29′13″, in the waters of Mississippi Sound north of the west end of Petit Bois Island.
(2) Explosives Anchorage Area No. 2. A circular area with a three-fourths mile radius with its center located at latitude 30°11′12″, longitude 88°30′07″, in the waters of Gulf of America south of the west end of Petit Bois Island.
(b) The regulations. (1) The areas shall be used as temporary anchorages for vessels engaged in loading and unloading explosives at the Port of Pascagoula, Miss.
(2) No vessel shall occupy the areas without obtaining a permit from the Captain of the Port.
§ 110.195 Mississippi River below Baton Rouge, LA, including South and Southwest Passes.
(a) The Anchorage Grounds. Unless otherwise specified, all anchorage widths are measured from the average low water plane (ALWP).
(1) Pilottown Anchorage. An area 5.2 miles in length along the right descending bank of the river from mile 1.5 to mile 6.7 above Head of Passes, extending in width to 1600 feet from the left descending bank of the river.
Caution: A wreck is located within the boundaries of this anchorage. Mariners are urged to use caution in this anchorage.
(2) Lower Venice Anchorage. An area 1.6 miles in length along the left descending bank of the river from mile 8.0 to mile 9.6 above Head of Passes with the west limit 1,200 feet from the ALWP of the right descending bank.
Caution: A pipeline crossing exists at mile 9.8 AHOP. Mariners are urged to use caution between mile 9.6 AHOP and mile 10.0 AHOP.
(3) Upper Venice Anchorage. An area 1.2 miles in length along the left descending bank of the river from mile 10.0 to mile 11.2 above Head of Passes with the west limit 1,200 feet from the ALWP of the right descending bank.
(4) Boothville Anchorage. An area, 6.45 miles in length, along the right descending bank of the river extending from mile 12.05 to mile 18.5 Above Head of Passes. The width of the anchorage is 750 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 250 feet from the water's edge into the river as measured from the Low Water Reference Plane (LWRP). The outer boundary of the anchorage is a line parallel to the nearest bank 1,000 feet from the water's edge into the river as measured from the LWRP.
Note 1 to paragraph (a)(4):
Venice Revetment extends/runs adjacent to this anchorage. Mariners are urged to use caution in this anchorage.
(5) Ostrica Anchorage. An area 1.4 miles in length along the right descending bank of the river extending from mile 23.0 to mile 24.4 above Head of Passes. The width of the anchorage is 800 feet.
(6) Port Sulphur Anchorage. An area 2.2 miles in length along the left descending bank of the river, 800 feet wide, extending from mile 37.5 to mile 39.7 above Head of Passes.
(7) Magnolia Anchorage. An area, 2.2 miles in length, along the right descending bank of the river extending from mile 45.4 to mile 47.6 Above Head of Passes. The width of the anchorage is 700 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 1,100 feet from the water's edge into the river as measured from the LWRP.
Note 2 to paragraph (a)(7):
Point Michel and Diamond Revetments extend/run adjacent to this anchorage. Mariners are urged to use caution in this anchorage.
(8) Point Celeste Anchorage. An area 2.2 miles in length along the right descending bank of the river extending from mile 49.8 to mile 52.0 above Head of Passes. The width of the anchorage is 400 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
(9) Davant Anchorage. An area, 1.4 miles in length, along the left descending bank of the river extending from mile 52.5 to mile 53.9 Above Head of Passes. The width of the anchorage is 800 feet.
(10) Alliance Anchorage. An area 2.0 miles in length along the right descending bank of the river extending from mile 63.8 to mile 65.8 above Head of Passes. The width of the anchorage is 400 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
(11) Wills Point Anchorage. An area, 1.1 miles in length, along the left descending bank of the river extending from mile 66.5 to mile 67.6 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 200 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
(12) Cedar Grove Anchorage. An area, 1.34 miles in length, along the right descending bank of the river extending from mile 69.56 to mile 70.9 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 200 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
Note 3 to paragraph (a)(12):
Jesuit Bend Revetment extends/runs adjacent to the lower portion of this anchorage. Mariners are urged to use caution in this anchorage.
(13) Belle Chasse Anchorage. An area, 2.15 miles in length, along the right descending bank of the river extending from mile 73.05 to mile 75.2 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 375 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 875 feet from the water's edge into the river as measured from the LWRP.
Note 4 to paragraph (a)(13):
Oak Point Revetment extends/runs adjacent to the lower portion of this anchorage. Mariners are urged to use caution in this anchorage.
(14) Lower 12 Mile Point Anchorage. An area, 2.2 miles in length, along the right descending bank of the river extending from mile 78.6 to mile 80.8 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 300 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
Note 5 to paragraph (a)(14):
English Turn Revetment extends/runs adjacent to the lower portion of this anchorage. Mariners are urged to use caution in this anchorage.
(15) Lower 9 Mile Anchorage. An area, 2.4 miles in length, along the right descending bank of the river extending from mile 82.6 to mile 85.0 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 300 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
Note 6 to paragraph (a)(15):
Twelve Mile Point Revetment extends/runs adjacent to the lower portion of this anchorage. Mariners are urged to use caution in this anchorage.
Caution: A wreck is located within the boundaries of this anchorage. Mariners are urged to use caution in this anchorage.
(16) New Orleans Emergency Anchorage. An area 0.5 miles in length along the right descending bank of the river extending from mile 89.6 to mile 90.1 above Head of Passes. The width of the anchorage is 550 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 250 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
Note 7 to paragraph (a)(16):
No vessel shall occupy this anchorage unless expressly authorized by the Captain of the Port. No vessel may anchor in this anchorage exceeding 24 hours without the authorization of the Captain of the Port.
(17) New Orleans General Anchorage. An area 0.8 miles in length along the right descending bank of the river extending from mile 90.1 to mile 90.9 above Head of Passes. The width of the anchorage is 550 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 250 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
(18) Quarantine Anchorage. An area 0.7 miles in length along the right descending bank of the river extending from mile 90.9 to mile 91.6 above Head of Passes. The width of the anchorage is 800 feet.
Caution: A wreck is located within the boundaries of this anchorage. Mariners are urged to use caution in this anchorage.
Note 8 to paragraph (a)(18):
Vessels carrying cargos of particular hazard as defined in 33 CFR 126.10 or cargos of petroleum products in bulk may not be anchored in the New Orleans General Anchorage or the Quarantine Anchorage without permission from the Captain of the Port.
Except when required by the United States Public Health Service for quarantine inspection, the Quarantine Anchorage may be used as a general anchorage.
(19) Lower Kenner Bend Anchorage. An area 1.0 miles in length along the right descending bank of the river extending from mile 113.3 to mile 114.3 above Head of Passes. The width of the anchorage is 350 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 350 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
(20) Kenner Bend Anchorage. An area 0.9 miles in length along the right descending bank of the river extending from mile 114.7 to mile 115.6 above Head of Passes. The width of the anchorage is 700 feet.
(21) Ama Anchorage. An area 1.8 miles in length along the left descending bank of the river extending from mile 115.5 to mile 117.3 above Head of Passes. The width of the anchorage is 400 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 300 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
Caution: A wreck is located at mile 115.4 left descending bank above Head of Passes marked by Mississippi River Wreck Lighted Buoy WR4. Mariners are urged to use caution when anchoring in the lower end of this anchorage.
(22) Bonnet Carre Anchorage. An area 1.5 miles in length along the left descending bank of the river extending from mile 127.3 to mile 128.8 above Head of Passes. This area is located adjacent to the river end of the Bonnet Carre Spillway. The width of the anchorage is 600 feet.
Note 9 to paragraph (a)(22):
When the Bonnet Carre Spillway is open, no vessel may be anchored in the Bonnet Carre Anchorage.
(23) La Place Anchorage. An area 0.7 miles in length along the left descending bank of the river extending from mile 134.7 to mile 135.4 above Head of Passes. The width of the anchorage is 600 feet.
(24) Reserve Anchorage. An area 0.5 miles in length along the right descending bank of the river extending from mile 137.0 to mile 137.5 above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 300 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
(25) Lower Grandview Reach Anchorage. An area 0.3 miles in length along the left descending bank of the river extending from mile 146.4 to mile 146.7 above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 200 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured for the LWRP.
(26) Middle Grandview Reach Anchorage. An area 0.4 miles in length along the left descending bank of the river extending from mile 146.8 to mile 147.2 above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 200 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
(27) Upper Grandview Reach Anchorage. An area 1.3 miles in length along the left descending bank of the river extending from mile 147.5 to mile 148.8 above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 200 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
(28) Sunshine Anchorage. An area 2.0 miles in length along the left descending bank of the river extending from mile 165.0 to mile 167.0 above Head of Passes. The width of the anchorage is 450 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 350 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
(29) White Castle Anchorage. An area, 0.84 miles in length, along the right descending bank of the river extending from mile 190.3 to mile 191.14 Above Head of Passes. The width of the anchorage is 300 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
(30) Baton Rouge General Anchorage. An area 1.5 miles in length along the right descending bank of the river, 1,400 feet wide, extending from mile 225.8 to mile 227.3 above Head of Passes.
Caution: Two wrecks are located within the boundaries of this anchorage. Mariners are urged to use caution in this anchorage.
(31) Lower Baton Rouge Anchorage. An area 0.5 miles in length near mid-channel between mile 228.5 and mile 229.0 above Head of Passes with the west limit 1,100 feet off the right descending bank and having the width of 700 feet at both the upper and lower limits.
(32) Middle Baton Rouge Anchorage. An area 0.2 miles in length near mid-channel between mile 229.6 and mile 229.8 above Head of Passes with the west limit 1,100 feet off the right descending bank and having a width of 700 feet at both the upper and lower limits.
(33) Upper Baton Rouge Anchorage. An area 0.4 miles in length near mid-channel between mile 230.6 and mile 231.0 above Head of Passes with the west limit 1,100 feet off the right descending bank and having a width of 1,075 feet at the upper limit and 1,200 feet at the lower limit.
(34) Belmont Anchorage. An area 1.1 miles in length along the left descending bank of the river extending from mile 152.9 (Belmont Light) to mile 154.0 above Head of Passes. The width of the anchorage is 300 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 700 feet from the water's edge into the river as measured from the LWRP.
(35) Point Michel Anchorage. An area, 2.2 miles in length, along the right descending bank of the river extending from mile 40.0 to mile 42.2 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 325 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 825 feet from the water's edge into the river as measured from the LWRP.
Note 10 to paragraph (a)(35):
Point Michel Revetment extends/runs adjacent to this anchorage. Mariners are urged to use caution in this anchorage.
(36) Plaquemines Point Anchorage. An area, 0.5 miles in length, along the right descending bank of the river extending from mile 203.9 to mile 204.4 Above Head of Passes. The width of the anchorage is 500 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 900 feet from the water's edge into the river as measured from the LWRP.
(37) Phoenix Anchorage. An area, 0.6 miles in length, along the left descending bank of the river extending from mile 57.82 to mile 58.42 Above Head of Passes. The width of the anchorage is 400 feet. The inner boundary of the anchorage is a line parallel to the nearest bank 400 feet from the water's edge into the river as measured from the LWRP. The outer boundary of the anchorage is a line parallel to the nearest bank 800 feet from the water's edge into the river as measured from the LWRP.
Note 11 to paragraph (a)(37):
Myrtle Grove Revetment extends/runs adjacent to this anchorage. Mariners are urged to use caution in this anchorage.
(b) Temporary anchorages. (1) Temporary anchorages are non-permanent anchorages established by the Commander, USCG Heartland District to provide additional anchorage space. Establishment of temporary anchorages is based on recommendations by the Captain of the Port.
(2) Each vessel using temporary anchorages shall anchor as prescribed by the Captain of the Port.
(3) Establishment of each temporary anchorage and any requirement for the temporary anchorage will be published in the Local Notice of Mariners.
(4) Each person who has notice of any requirement prescribed for a temporary anchorage shall comply with that requirement.
(c) The Regulations. (1) Anchoring in the Mississippi River below Baton Rouge, LA., including South and Southwest Passes is prohibited outside of established anchorages except in cases of emergency. In an emergency, if it becomes necessary to anchor a vessel outside an established anchorage, the vessel shall be anchored so that it does not interfere with or endanger any facility or other vessel. The master or person in charge of the vessel shall notify the Captain of the Port of the location of the emergency anchoring by the most expeditious means and shall move the vessel as soon as the emergency is over.
(2) In an emergency, if it becomes necessary to anchor a vessel in South Pass or Southwest Pass, the vessel shall be positioned as close to the left descending bank as possible.
(3) No vessel may be anchored unless it maintains a bridge watch, guards and answers Channel 16 FM (or the appropriate VTS New Orleans sector frequency), maintains an accurate position plot and can take appropriate action to ensure the safety of the vessel, structure, and other vessels.
(4) When anchoring individually, or in fleets, vessels shall be anchored with sufficient anchors, or secured with sufficient lines, to ensure their remaining in place and withstanding the actions of winds, currents and the suction of passing vessels.
(5) No vessel may be anchored over revetted banks of the river or within any cable or pipeline area. The locations of revetted areas and cable and pipeline areas may be obtained from the District Engineer, Corps of Engineers, New Orleans, LA.
(6) The intention to transfer any cargo while in an anchorage shall be reported to the Captain of the Port, giving particulars as to name of ships involved, quantity and type of cargo, and expected duration of the operation. The Captain of the Port shall be notified upon completion of operations. Cargo transfer operations are not permitted in the New Orleans General or Quarantine Anchorages. Bunkering and similar operations related to ship's stores are exempt from reporting requirements.
Note 12 to paragraph (c)(6):
Activities conducted within a designated anchorage (e.g. cargo transfer, tank cleaning, stack blowing, etc.) may be restricted by other Federal, State or local regulations. Owners, or persons in charge of any vessel should consider all safety and/or environmental regulations prior to engaging in any activity within designated anchorages.
(7) Vessels anchored in the Lower Kenner Bend Anchorage are prohibited from using or exercising the ship's hold cargo cranes. Vessels in this anchorage must keep the ship's hold cargo gear in the down and hawsed position, as rigged for sea transits. Deck-mounted cranes, deck booms and stiff legs may be used to take on ships stores and spare parts and may be used to move manifold hoses.
(8) Nothing in this section relieves the owner or person in charge of any vessel from the penalties for obstructing or interfering with navigational aids or for failing to comply with the navigation laws for lights, day shapes, or fog signals and any other applicable laws and regulations.
[CGD 77-028, 46 FR 49850, Oct. 8, 1981]
Editorial Note:For Federal Register citations affecting § 110.195, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.196 Sabine Pass Channel, Sabine Pass, Tex.
(a) The anchorage area. The water bounded by a line connecting the following coordinates:
Latitude | Longitude
29°43′59.0″ N | 93°52′08.1″ W
29°44′06.8″ N | 93°51′57.6″ W
29°43′53.0″ N | 93°51′47.1″ W
29°43′36.7″ N | 93°51′50.9″ W
(b) The regulations. (1) The anchorage area is for the temporary use of vessels of all types, but especially for naval and merchant vessels awaiting weather and tidal conditions favorable to the resumption of their voyages.
(2) Except when stress of weather or adverse tides or currents make sailing impractical or hazardous, vessels shall not anchor in the anchorage area for periods exceeding 48 hours unless expressly authorized by the Captain of the Port to anchor for longer periods.
(3) Vessels shall not anchor so as to obstruct the passage of other vessels proceeding to or from available anchorage spaces.
(4) Anchors shall not be placed channelward from the anchorage area, and no portion of the hull or rigging of any anchored vessel shall extend channelward from the limits of the anchorage area.
(5) Vessels using spuds for anchors shall anchor as close to shore as practicable having due regard for the provisions in paragraph (b)(3) of this section.
(6) Fixed moorings, piles or stakes, and floats or buoys for marking anchorages or moorings in place are prohibited.
(7) Whenever the maritime or commercial interests of the United States so require, the Captain of the Port is hereby empowered to shift the position of any vessel anchored or moored within or outside of the anchorage area including any vessel which is moored or anchored so as to obstruct navigation or interfere with range lights.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD08-06-26, 72 FR 464, Jan. 5, 2007; USCG-2018-0388, 84 FR 9459, Mar. 15, 2019]
§ 110.197 Galveston Harbor, Bolivar Roads Channel, Texas.
(a)(1) Anchorage area (A). The water bounded by a line connecting the following points:
Latitude | Longtitude
29°20′48.5″ N | 94°42′54.0″ W
29°20′43.0″ N | 94°44′46.5″ W
29°21′15.0″ N | 94°44′27.0″ W
29°21′05.0″ N | 94°42′52.0″ W
and thence to the point of beginning.
(2) Anchorage area (B). The water bounded by a line connecting the following points:
Latitude | Longtitude
29°20′43.0″ N | 94°44′46.5″ W
29°20′37.0″ N | 94°46′08.0″ W
29°21′14.0″ N | 94°45′50.0″ W
29°21′15.0″ N | 94°44′27.0″ W
and thence to the point of beginning.
(3) Anchorage area (C). The water bounded by a line connecting the following points:
Latitude | Longitude
29°20′39.0″ N | 94°46′07.5″ W.
29°21′06.1″ N | 94°47′00.2″ W.
29°21′24.0″ N | 94°46′34.0″ W.
29°21′14.5″ N | 94°45′49.0″ W.
and thence to the point of beginning.
(4) Anchorage Area (A) East. The waters bounded by a line connecting the following points:
Latitude | Longitude
29°21′5.87″ N | 094°42′52.7″ W
29°20′53.99″ N | 094°42′7.13″ W
29°20′45.31″ N | 094°42′37.75″ W
29°20′39.16″ N | 094°42′7.81″ W
and thence to the point of beginning. The coordinates are based on NAD 83.
(b) The regulations. (1) The anchorage area is for the temporary use of vessels of all types, but especially for vessels awaiting weather and other conditions favorable to the resumption of their voyages.
(2) Except when stress of weather makes sailing impractical or hazardous, vessels shall not anchor in anchorage areas (A), (B), or (C) for more than 48 hours unless expressly authorized by the Captain of the Port Houston-Galveston. Permission to anchor for longer periods may be obtained through Coast Guard Vessel Traffic Service Houston/Galveston on VHF-FM channels 12 (156.60 MHz) or 13 (156.65 MHz).
(3) No vessel with a draft of less than 22 feet may occupy anchorage (A) without prior approval of the Captain of the Port.
(4) No vessel with a draft of less than 16 feet may anchor in anchorage (C) without prior approval of the Captain of the Port Houston-Galveston.
(5) Vessels shall not anchor so as to obstruct the passage of other vessels proceeding to or from other anchorage spaces.
(6) Anchors shall not be placed in the channel and no portion of the hull or rigging of any anchored vessel shall extend outside the limits of the anchorage area.
(7) Vessels using spuds for anchors shall anchor as close to shore as practicable, having due regard for the provisions in paragraph (b)(5) of this section.
(8) Fixed moorings, piles or stakes, and floats or buoys for marking anchorages or moorings in place, are prohibited.
(9) Whenever the maritime or commercial interests of the United States so require, the Captain of the Port, or his authorized representative, may direct the movement of any vessel anchored or moored within the anchorage areas.
[CCGD8-85-21, 55 FR 11369, Mar. 28, 1990, as amended by CGD08-02-018, 68 FR 25497, May 13, 2003; USCG-2015-0549, 83 FR 18414, Apr. 27, 2018; USCG-2019-0028, 86 FR 7649, Feb. 1, 2021]
§ 110.205 Chicago Harbor, Ill.
(a) The anchorage grounds—(1) Anchorage A, exterior breakwater. Southwest of a line parallel with and 150 feet southwestward of the exterior breakwater; west of a line parallel with and 150 feet west of the south extension of the exterior breakwater; northeast of a line parallel with and 1,500 feet southwestward of the exterior breakwater; and east of a line parallel with the south extension of the exterior breakwater and 500 feet eastward of the east face of the filtration plant.
(2) Anchorage B, south arm. West of a line parallel with and 150 feet west of the south arm of the exterior breakwater; north of a line perpendicular to the south arm at its south end; east of a line parallel with the south arm, about 2,200 feet therefrom and on line with the east face of the Municipal Pier; and south of a line perpendicular to the south arm 700 feet from its north end.
(3) Anchorage C, shore arm. South of a line parallel with and 150 feet southward of the shore arm of the exterior breakwater; west of a line parallel with the south extension of the exterior breakwater, 100 feet westward of the east end of the shore arm; northwest of a line perpendicular to the Lake Shore Drive revetment and 300 feet northwest of the northwest corner of the filtration plant; and east of a line parallel with and 600 feet lakeward of the Lake Shore Drive revetment.
(4) Anchorage D, Chicago Harbor Lock South. Beginning at a point 35.5 feet South (16 feet South of the South face of the Southeast guidewall) and 28.0 feet West of the SE Guide Wall Light; thence Westerly and parallel to the guidewall 800 feet to a point that is 16 feet South of the South face of the Southeast guidewall; thence Southerly 80 feet to a point that is 96 feet South of the South face of the Southeast guidewall; thence Easterly 800 feet to a point that is 96 feet South of the south face of the southeast guidewall; thence Northerly 80 feet to the point of beginning.
(5) Anchorage E, Chicago Harbor Lock North. Beginning at a point 156.75 feet North (16 feet North of the North face of the Northeast guidewall) and 590 feet West of the SE Guidewall Light; thence Westerly and parallel to the guidewall 600 feet to a point that is 16 feet North of the North face of the Northeast guidewall; thence Northerly 80 Feet to a point that is 96 feet North of the North face of the Northeast guidewall; thence Easterly 600 feet to a point that is North of the North face of the Northeast guidewall; thence Southerly 80 feet to the point of beginning.
(b) The rules and regulations. (1) Except in cases of emergency, no vessel may be anchored in Chicago Harbor outside of the anchorage grounds in paragraph (a) of this section or the special anchorage areas prescribed in § 110.83.
(2) Anchors must not be placed outside the anchorage areas, nor shall any vessel be so anchored that any portion of the hull or rigging shall at any time extend outside the boundaries of the anchorage area.
(3) Any vessel anchoring under circumstances of great emergency outside of the anchorage areas must be placed near the edge of the channel and in such position as not to interfere with the free navigation of the channel nor obstruct the approach to any pier nor impede the movement of any boat, and shall move away immediately after the emergency ceases, or upon notification by the Captain of the Port.
(4) The maneuvering of a vessel by means of a dragged anchor, except within an established anchorage ground or in stress of weather or to avoid collision, is prohibited. Unnecessary maneuvering in any of the anchorage grounds is prohibited.
(5) The directions of the Captain of the Port assigning vessels to parts of the anchorage grounds suitable to their draft, requiring vessels to anchor bow and stern, requiring shifting the anchorage of any vessel within any anchorage ground for the common convenience, or for otherwise enforcing this section, shall be promptly executed by owners, masters, and persons in charge of vessels.
(6) Nothing in this section shall be construed as relieving the owner or person in charge of any vessel from the penalties of the law for obstructing navigation or for obstructing or interfering with range lights, or for not complying with the navigation laws in regard to lights, fog signals, or for otherwise violating law.
(7) No vessel may use anchorages A, B, D, and E except commercial vessels operated for profit. No person may place floats or buoys for making moorings or anchors in place in anchorages A and B. No person may place fixed moorings piles or stakes in anchorages A and B. (Mooring facilities are available adjacent to the lakeside guidewalls of the Chicago Harbor Lock in anchorages D and E.) All vessels using anchorages D and E shall moor against pile clusters adjacent to the respective anchorage.
Any time barges are moored in anchorage D or E, a manned towing vessel shall be present in one of these anchorages. Exceptions to this surveillance requirement are allowable for periods not to exceed one hour.
(8) No commercial vessels operated for profit that measure 50 gross tons or more may anchor in anchorage C. Temporary floats or buoys for marking moorings or anchors in place may be used in anchorage C. No person may place a fixed mooring pile or stake in anchorage C.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGFR 70-65a, 36 FR 7967, Apr. 28, 1971; CGD9-85-01, 50 FR 29224, July 18, 1985]
§ 110.206 Detroit River, Michigan.
(a) The Anchorage grounds. Belle Isle Anchorage. The area is in the Detroit River immediately downstream from Belle Isle on the U.S. side of the International Boundary line within the following boundaries: beginning at a point bearing 250 T, 5400 feet from the James Scott Memorial Fountain (42°20′06″ N., 82°59′57″ W.) at the West end of Belle Isle; then 251 T, 3000 feet; thence 341 T, 800 feet; thence 071 T, 3000 feet; thence 161 T, 800 feet to the point of beginning.
(b) The regulations. (1) Vessels shall be anchored so as not to swing into the channel or across steering courses.
(2) The Belle Isle Anchorage area is for the temporary use of vessels of all types, but especially for naval and merchant vessels awaiting berths, weather, or other conditions favorable to the resumptions of their voyage.
(3) No vessel may be anchored unless it maintains a continuous bridge watch, guards and answers channel 16 FM and channel 12 FM (VTC SARNIA sector frequency), maintains an accurate position plot and can take appropriate action to ensure the safety of the vessel, structures and other vessels.
(4) Vessels may not anchor in the Belle Isle Anchorage for more than 72 hours without permission of the Captain of the Port of Detroit.
[CGD09 85-05, 51 FR 21357, June 12, 1986, as amended by USCG-1998-3799, 63 FR 35526, June 30, 1998]
§ 110.207 Cleveland Harbor, Ohio.
(a) The anchorage grounds—(1) West anchorage. The northwesterly portion of the West Basin between the northwest limits of the West Basin and a line parallel to and 1,050 feet distant from the West Breakwater; and from the southwest limits of the West Basin to a line perpendicular to the West Breakwater, 2,050 feet southwesterly along the West Breakwater from Cleveland West Breakwater Light.
(2) East anchorage. The southeasterly portion of the East Basin between the mainland and a line parallel to and 1,250 feet distant from the East Breakwater; from opposite Cleveland East Entrance Light to a due north line passing through the flashing white light on the Allied Oil Company dock.
(3) Explosives anchorage. In Lake Erie, northwest of Cleveland Harbor East Breakwater, and including a rectangular area marked by four white spar buoys at the following true bearings and distances from Cleveland East Pierhead Light: 38°30′, 2,050 feet; 68°, 2,050 feet; 57°, 7,050 feet; and 49°, 7,050 feet.
(b) The regulations. (1) The west and east anchorages are general anchorages.
(2) Use of the explosives anchorage shall be subject to the supervision of the Captain of the Port.
§ 110.208 Buffalo Harbor, N.Y.
(a) The anchorage grounds—(1) Explosives Anchorage A. Inside the south section of the main breakwater 700 feet wide starting at a point 500 feet southerly from the south end of the north section and extending approximately 153° true, 3,000 feet parallel to the line of the south section of the main breakwater.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD 77-210, 44 FR 50040, Aug. 27, 1979]
§ 110.209 Saint Lawrence Seaway Anchorages, New York.
(a) Carleton Island Anchorage; Saint Lawrence River, Cape Vincent, New York—(1) Carleton Island Anchorage Area. The waters bounded by a line connecting the following points, beginning at 44°11′57.11″ N, 076°14′04.62″ W; thence to 44°11′21.80″ N, 076°14′05.77″ W; thence to 44°11′34.07″ N, 076°15′49.57″ W; 44°11′35.35″ N, 076°16′47.50″ W; 44°11′43.49″ N, 076°16′48.00″ W; 44°11′57.11″ N, 076°14′04.62″ W and back to the beginning point. These coordinates are based on WGS 84.
(2) Tibbett's Island Anchorage Area. The waters bounded by a line connecting the following points, beginning at 44°05′20.27″ N, 076°23′25.78″ W; thence to 44°05′21.85″ N, 076°22′40.97″ W; thence to 44°04′34.08″ N, 076°23′09.98″ W; 44°04′07.72″ N, 076°23′33.76″ W; 44°04′32.78″ N, 076°24′43.80″ W; 44°05′44.37″ N, 076°23′56.29″ W; 44°05′20.27″ N, 076°23′25.78″ W and back to the beginning point. These coordinates are based on WGS 84.
(b) The regulations. (1) Anchors must not be placed in the Saint Lawrence Seaway shipping channel. No portion of the hull or rigging may extend outside the limits of the anchorage area.
(2) No vessel may occupy any general anchorage described in paragraph (a) of this section for a period longer than 10 days unless approval is obtained from the Captain of the Port Buffalo (COTP) for that purpose.
(3) The COTP, or authorized representative, may require vessels to depart from the Anchorages described in paragraph (a) of this section before the expiration of the authorized or maximum stay. The COTP, or authorized representative, will provide at least 12-hour notice to a vessel required to depart the anchorages.
[USCG-2017-1125, 83 FR 30345, June 28, 2018]
§ 110.210 San Diego Harbor, CA.
(a) The anchorage grounds. (1) Special anchorage for U.S. Government vessels (NAD 83). The waters bounded by a line connecting the following points:
Latitude | Longtitude
32°42′13.2″ N | 117°14′11.0″ W
32°41′12.0″ N | 117°14′00.3″ W
and thence along the shoreline to the point of beginning.
(2) Special anchorage for U.S. Government vessels (NAD 83). The waters bounded by a line connecting the following points:
Latitude | Longtitude
32°43′25.6″ N | 117°12′46.1″ W
32°43′25.3″ N | 117°12′52.0″ W
32°43′08.2″ N | 117°12′58.0″ W
32°42′57.9″ N | 117°12′54.0″ W
and thence easterly along the northern boundary of the channel to:
Latitude | Longtitude
32°43′05.0″ N | 117°11′30.5″ W
32°43′27.2″ N | 117°11′14.0″ W
and thence along the shoreline of Harbor Island to the point of beginning.
(3) “B” Street Merchant Vessel Anchorage (NAD 83). The waters bounded by a line connecting the following points:
Latitude | Longtitude
32°43′00.8″ N | 117°10′36.3″ W
32°43′00.8″ N | 117°11′23.0″ W
32°43′05.0″ N | 117°11′30.5″ W
32°43′27.2″ N | 117°11′14.0″ W
32°43′20.2″ N | 117°10′53.0″ W
and thence due east to the shoreline, and thence along the shoreline and pier to the point of beginning.
(b) The regulations. (1) The anchorages described in paragraphs (a)(1) and (a)(2) of this section are reserved exclusively for the anchorage of vessels of the United States Government and of authorized harbor pilot boats. No other vessels shall anchor in this area except by special permission obtained in advance from the Commander, Naval Base, San Diego, CA. The administration of these anchorages is exercised by the Commander, Naval Base, San Diego, CA.
(2) The area described in paragraph (a)(3) of this section is reserved for the use of merchant vessels calling at the Port of San Diego while awaiting a berth. The administration of this anchorage is exercised by the Port Director, San Diego Unified Port District.
(3) Vessels anchoring in San Diego Harbor shall leave a free passage for other craft and shall not obstruct the approaches to the wharves in the harbor.
[CGD11-85-06, 51 FR 19753, June 2, 1986, as amended by CGD11-90-08, 56 FR 9852, Mar. 8, 1991]
§ 110.214 Los Angeles and Long Beach harbors, California.
(a) General Regulations—(1) Anchorage Assignment. (i) Unless otherwise directed by the Captain of the Port Los Angeles-Long Beach, the Long Beach Port Pilots will assign all anchorages inside the federal breakwater. All anchorages outside (seaward) of the federal breakwater will be assigned by Vessel Movement Reporting System (VMRS) Center Los Angeles-Long Beach. The master, pilot, or person in charge of a vessel must notify the Long Beach Pilots (for anchorages inside the federal breakwater) or VMRS Center Los Angeles-Long Beach (for anchorages outside the federal breakwater) of their intention to anchor, upon anchoring, and at least fifteen minutes prior to departing an anchorage. All anchorage assignments will be made as described in this part unless modified by the Captain of the Port.
(ii) Radio communications for port entities governing anchorages are as follows: VMRS Center Los Angeles-Long Beach, call sign “San Pedro Traffic”, Channel 14 VHF-FM; Long Beach Port Pilots, call sign “Long Beach Pilots”, Channel 12 VHF-FM.
(iii) The exact boundary separating the Port of Long Beach from the Port of Los Angeles is published in local Port Tariffs. For purposes of this rule, Long Beach waters are those east, and Los Angeles waters are those west, of the following locations:
(A) Inner Harbor: The Henry Ford (Badger Avenue) Bridge.
(B) Middle Harbor: The Pier 400 Transportation Corridor.
(C) Outer Harbor: The western boundary of Commercial Anchorage B.
(2) Required approvals, permits and notifications. (i)(A) No vessel may anchor in deep draft sub-anchorages B-7, B-9, B-11, D-5, D-6 or D-7 within Los Angeles or Long Beach harbors for more than 48 consecutive hours unless extended anchorage permission is obtained from the Captain of the Port. These sub-anchorages are defined by the following coordinates and dimensions:
Anchorage | Latitude | Longitude | Radius (yards)
B-7 | 33-43′ 52.0″ N | 118-12′ 47.9″ W | 450
B-9 | 33-43′ 28.5″ N | 118-13′ 10.5″ W | 500
B-11 | 33-43′ 44.5″ N | 118-12′ 17″ W | 450
D-5 | 33-43′ 40.5′ N | 118-10′ 30″ W | 450
D-6 | 33-43′ 40.5′ N | 118-9′ 57.5″ W | 450
D-7 | 33-43′ 40.5′ N | 118-9′ 25″ W | 450
(B) No vessel may anchor anywhere else within Los Angeles or Long Beach harbors (inside the federal breakwater) for more than 10 consecutive days unless extended anchorage permission is obtained from the Captain of the Port. In determining whether extended anchorage permission will be granted, consideration will be given, but not necessarily limited to: The current and anticipated demands for anchorage space within the harbor, the requested duration, the condition of the vessel, and the reason for the request.
(ii) No vessel while carrying, loading, or unloading division 1.1 or 1.2 materials as defined in 49 CFR 173.50, or Cargoes of Particular Hazard (COPH) as defined in 33 CFR 126.10, or Certain Dangerous Cargoes (CDC) as defined in 33 CFR 160.202, may anchor without first obtaining a permit issued by the Captain of the Port.
(iii) Vessels requiring use of an explosives anchorage should contact the Captain of the Port at least 24 hours prior to the anticipated need for the explosives anchorage to allow for proper activation of that anchorage.
(iv) Except with the prior approval of the Captain of the Port, or, in the case of an emergency, with approval of the Captain of the Port immediately subsequent to anchoring, no commercial vessel greater than 1600 gross tons may anchor in Los Angeles-Long Beach Harbor unless it maintains the capability to get underway within 30 minutes. Any vessel unable to meet this requirement must immediately notify the Captain of the Port and make arrangements for an adequate number of tugs to respond to the vessel within 30 minutes notice.
(v) In anchorages where lightering is authorized, the Captain of the Port must be notified at least 4 hours in advance of a vessel conducting lightering operations (see 33 CFR 156.118).
(3) Other General Requirements. (i) When at anchor, all commercial vessels greater than 1600 gross tons shall, at all times, have a licensed or credentialed deck officer on watch and maintain a continuous radio listening watch unless subject to one of the exemptions in this paragraph. The radio watch must be on CH-12 VHF-FM when anchored inside the federal breakwater, and on CH-14 VHF-FM when anchored outside the federal breakwater, except for unmanned barges; vessels which have less than 100 gallons of oil or fuel onboard regardless of how the fuel is carried; and other vessels receiving advance approval from the Captain of the Port.
(ii) When winds are forecasted and/or observed at 35 knots or greater (including wind gusts) vessels shall ensure their propulsion plant is placed in immediate standby and a second anchor, if installed, is made ready to let go. Vessels unable to comply with this requirement must immediately notify the Captain of the Port. In such case, the Captain of the Port may require additional precautionary measures, including but not limited to one or more tugs standing by to render immediate assistance.
(4) Prohibitions. Within Los Angeles Harbor, Long Beach Harbor, and the Los Angeles-Long Beach Precautionary Area, except for emergency reasons, or with the prior approval of the Captain of the Port, vessels are prohibited from anchoring outside of designated anchorage areas. In the event a vessel anchors outside a designated anchorage area for emergency reasons, the master, pilot, or person in charge of the vessel shall:
(i) Position the vessel so as to minimize the danger to other vessels and facilities;
(ii) Immediately notify the Captain of the Port by the most expeditious means of the vessel's location and the reason(s) for the emergency anchoring; and
(iii) Move the vessel as soon as the emergency condition prompting anchoring outside a designated area abates, or as soon as ordered to move by the Captain of the Port, whichever occurs sooner.
(5) Exemption from rules. The Captain of the Port may, upon request, or whenever he/she deems appropriate, authorize a deviation from any rule in this section.
(b) The anchorage grounds. Locations of anchorage grounds are as described in this section. Specific requirements for individual anchorages are contained in paragraphs (c) and (d) of this section. All coordinates referenced use datum: NAD 83.
(1) [Reserved]
(2) Commercial Anchorage B (Long Beach Harbor). An area enclosed by a line joining the following coordinates:
Latitude | Longitude
Beginning point | 33°-44′-37.0″ N | 118 °-13′-00.0″ W.
Thence south/southeast to | 33°-44′-12.0″ N | 118° -12′-36.2″ W.
Thence southeast to | 33° -43′-38.2″ N | 118° -11′-36.9″ W.
Thence southwest to | 33° -43′-26.1″ N | 118° -11′-47.2″ W.
Thence west to | 33°-43′-26.1″ N | 118°-12′-22.7″ W.
Thence west/southwest to | 33° -42′-58.9″ N | 118° -13′-53.0″ W.
Thence north/northwest to | 33° -43′-46.0″ N | 118° -14′-13.6″ W.
Thence east/northeast to | 33° -43′-54.5″ N | 118° -13′-50.0″ W.
Thence north to | 33°-44′-22.8″ N | 118°-13′-51.0″ W.
Thence east/northeast to the beginning point
(3) Commercial Anchorage C (Long Beach Harbor). An area enclosed by a line joining the following coordinates:
Latitude | Longitude
Beginning point | 33°-44′-20.0″ N | 118°-08′-26.2″ W
Thence west to | 33°-44′-23.5″ N | 118°-09′-32.6″ W
Thence north to | 33°-44′-52.8″ N | 118°-09′-33.2″ W
Thence southeast to | 33°-44′-25.2″ N | 118°-08′-26.2″ W
Thence south to the beginning point.
(4) Commercial Anchorage D (Long Beach Harbor). An area enclosed by a line beginning near the east end of the Long Beach Breakwater and joining the following coordinates:
Latitude | Longitude
Beginning point | 33°-43′-27.2″ N | 118°-08′-12.6″ W
Thence west to | 33°-43′-27.2″ N | 118°-10′-46.5″ W
Thence north to | 33°-43′-51.0″ N | 118°-10′-46.5″ W
Thence northeast to | 33°-44′-18.5″ N | 118°-10′-27.2″ W
Thence east to | 33°-44′-18.5″ N | 118°-08′-12.6″ W
Thence south to the beginning point.
(5) Commercial Anchorage E (Long Beach Harbor). An area enclosed by a line joining the following coordinates:
Latitude | Longitude
Beginning point | 33°-44′-37.0″ N | 118°-09′-48.5″ W.
Thence southwest to | 33° -44′-18.5″ N | 118° -09′-56.8″ W.
Thence west to | 33°-44′-18.5″ N | 118°-10′-27.2″ W.
Thence northwest to | 33° -44′-27.6″ N | 118° -10′-41.0″ W.
Thence west/northwest to | 33° -44′-29.0″ N | 118° -10′-57.4″ W.
Thence north/northwest to | 33° -45′-06.4″ N | 118° -11′-09.5″ W.
Thence northeast to | 33° -45′-15.2″ N | 118° -10′-46.1″ W.
Thence southeast to | 33° -45′-11.0″ N | 118° -10′-32.0″ W.
Thence south to | 33°-44′-52.0″ N | 118°-10′-32.0″ W.
Thence southeast to the beginning point
(6) Commercial Anchorage F (outside of Long Beach Breakwater). (i) The waters southeast of the Long Beach Breakwater bounded by a line connecting the following coordinates:
Table 6 to Paragraph (b)(6)(i)
Latitude | Longitude
Beginning Point | 33°43′05.1″ N | 118°08′04.0″ W
Thence west to | 33°43′05.0″ N | 118°10′32.5″ W
Thence south/southeast to | 33°42′13.3″ N | 118°09′54.8″ W
Thence south/southeast to | 33°40′51.3″ N | 118°09′32.2″ W
Thence south/southeast to | 33°38′36.2″ N | 118°07′43.8″ W
Thence north/northeast to | 33°40′44.4″ N | 118°06′51.4″ W
(ii) And thence north/northwest to the beginning point.
(7) Commercial Anchorage G (outside of the Middle Breakwater). (i) The waters south of the Middle Breakwater bounded by a line connecting the following coordinates:
Table 7 to Paragraph (b)(7)(i)
Latitude | Longitude
Beginning Point | 33°43′05.4″ N | 118°11′17.9″ W
Thence west to | 33°43′05.4″ N | 118°12′18.6″ W
Thence south/southwest to | 33°42′25.8″ N | 118°14′19.2″ W
Thence southeast to | 33°40′50.4″ N | 118°13′01.2″ W
Thence northeast | 33°41′02.9″ N | 118°12′19.0″ W
Thence east/northeast to | 33°42′10.8″ N | 118°11′36.0″ W
(ii) And thence north/northeast to the beginning point.
(8) General Anchorage N (Los Angeles Harbor). The waters near Cabrillo Beach shoreward of a line connecting the following coordinates:
Latitude | Longitude
33°-42′-55.9″ N | 118°-16′-44.4″ W
33°-42′-26.8″ N | 118°-16′-33.9″ W
(9) General Anchorage P (Long Beach Harbor). The waters within an area beginning at Alamitos Bay West Jetty Light “1” and connecting the following coordinates:
Latitude | Longitude
Beginning point | 33°-44′-14.5″ N | 118°-07′-19.2″ W
Thence northwest to | 33°-44′-20.6″ N | 118°-07′-31.7″ W
Thence northwest | 33°-45′-06.5″ N | 118°-09′-34.0″ W
Thence along the eastern shoreline of Island White to the lighted marker at | 33°-45′-13.5″ N | 118°-09′-34.0″ W
Thence northwest to | 33°-45′-37.1″ N | 118°-10′-38.5″ W
Thence north/northwest to | 33°-45′-49.4″ N | 118°-10′-38.8″ W
And thence east/southeast along the Long Beach shoreline and the Alamitos Bay West Jetty to the beginning point.
(10) General Anchorage Q (Long Beach Harbor/Alamitos Bay/Anaheim Bay). The waters within an area described as follows:
Latitude | Longitude
Beginning point | 33°-44′-36.0″ N | 118°-08′-13.0″ W
Thence east/southeast to | 33°-44′-20.6″ N | 118°-07′-31.7″ W
Thence along a line described as an arc, radius of 460 meters (approximately 1509 feet) centered on | 33°-44′-12.5″ N | 118°-07′-16.5″ W
To | 33°-44′-04.8″ N | 118°-07′-01.0″ W
Thence northwest to | 33°-44′-11.1″ N | 118°-07′-13.0″ W
Thence north/northeast to | 33°-44′-24.0″ N | 118°-07′-04.1″ W
Thence east/southeast to | 33°-44′-22.5″ N | 118°-06′-57.0″ W
Thence along the shoreline of Seal Beach and Anaheim Bay W. Jetty to | 33°-43′-39.1″ N | 118°-06′-06.8″ W
Thence west/southwest to | 33°-43′-27.8″ N | 118°-07′-39.9″ W
Thence northwest to | 33°-43′-38.4″ N | 118°-07′-48.2″ W
Thence west to | 33°-43′-38.4″ N | 118°-08′-12.9″ W
and thence north to the beginning point.
(11) Explosives Anchorage (Long Beach Harbor). A circular area with a radius of 1,909 yards (1,745 meters), centered in position 33°43′37.0″ N, 118°09′05.3″ W.
(c) Individual anchorage requirements: (1) Table 11 to this paragraph (c) lists anchorage grounds, identifies the purpose of each anchorage, and contains specific regulations applicable to certain anchorages. Requirements for the explosives anchorage are contained in paragraph (d) of this section.
(2) The geographic boundaries of each anchorage are contained in paragraph (b) of this section.
Table 11 to Paragraph (c)
Anchorage | General location | Purpose | Specific regulations
B | Long Beach Harbor | ......do | ......Do.
C | ......do | ......do | Notes a, g.
D | ......do | Commercial & Naval | Notes a, b, g.
E | ......do | Commercial | Note c.
F | Outside Breakwater | ......do | Notes c, d, g.
G | ......do | ......do | Notes c, d.
N | Los Angeles Harbor | Small Craft | Note e.
P | Long Beach Harbor | ......do | Note f.
Q | ......do | ......do | Notes c, g.
Notes:
a. Bunkering and lightering are permitted.
b. West of 118°09′48″ W priority for use of the anchorage will be given to commercial vessels over 244 meters (approximately 800 feet). East of 118°09′48″ W priority for use of the anchorage will be given to Naval and Public vessels, vessels under Department of Defense charter, and vessels requiring use of the explosives anchorage.
c. Bunkering and lightering are prohibited.
d. This anchorage is within a Regulated Navigation Area and additional requirements apply as set forth in 33 CFR 165.1152.
e. This anchorage is controlled by the Los Angeles Port Police. Anchoring, mooring and recreational boating activities conforming to applicable City of Los Angeles ordinances and regulations are allowed in this anchorage.
f. This anchorage is controlled by the Long Beach Harbor Master. Anchoring, mooring and recreational boating activities conforming to applicable City of Long Beach ordinances and regulations are allowed in this anchorage.
g. When the explosives anchorage is activated portions of this anchorage lie within the explosives anchorage and the requirements of paragraph (d) of this section apply.
(d) Explosives Anchorage (Long Beach Harbor). (1) Priority for use of this anchorage shall be given to vessels carrying, loading, or unloading division 1.1, 1.2, 1.3, or 1.4 (explosive) materials as defined in 49 CFR 173.50, or Cargoes of Particular Hazard (COPH) as defined in 33 CFR 126.10, or Certain Dangerous Cargoes (CDC) as defined in 33 CFR 160.202.
(2) Vessels requiring the use of this anchorage shall notify the Captain of the Port at least 24 hours in advance of their intentions including the estimated times of arrival, departure, net explosive weight, and whether the vessel will be loading or unloading. Vessels may not use this anchorage without first obtaining a permit issued by the Captain of the Port.
(3) No vessel containing more than 680 metric tons (approximately 749 tons) of net explosive weight (NEW) may anchor in this anchorage;
(4) Bunkering and lightering operations are permitted in the explosives anchorage, except that vessels engaged in the loading or unloading of explosives shall not simultaneously conduct bunkering or lightering operations.
(5) Each anchored vessel loading, unloading or laden with explosives, must display a red flag of at least 1.2 square meters (approximately 16 square feet) in size by day, and at night the flag must be illuminated by spotlight;
(6) When a vessel displaying the red flag occupies the explosives anchorage, no other vessel may anchor within the Explosives Anchorage.
Note:
When the explosives anchorage is activated, portions of Anchorages “C”, “D”, “F” and “Q” are encompassed by the explosives anchorage.
[CGD11-99-008, 65 FR 10710, Feb. 29, 2000, as amended by CGD11-04-007, 71 FR 3002, Jan. 19, 2006; CGD11-04-005, 71 FR 15037, Mar. 27, 2006; USCG-2006-24371, 74 FR 11212, Mar. 16, 2009; USCG-2013-0841, 79 FR 71657, Dec. 3, 2014; USCG-2005-21869, 80 FR 5330, Jan. 30, 2015; USCG-2023-0868, 90 FR 43393, Sept. 9, 2025]
§ 110.215 Anaheim Bay Harbor, California; U.S. Naval Weapons Station, Seal Beach, California; Naval Explosives Anchorage.
(a) The anchorage ground. The waters of Anaheim Bay Harbor between the east side of the Entrance Channel and the East Jetty, and the west side of the Entrance Channel and the West Jetty as outlined in the following two sections:
(1) East Side:
Latitude | Longtitude
33°44′03.0″ N | 118°05′35.0″ W
33°43′53.0″ N | 118°05′15.0″ W
33°43′49.0″ N | 118°05′18.0″ W
33°43′36.5″ N | 118°05′56.0″ W
33°43′37.0″ N | 118°05′57.0″ W
33°44′03.0″ N | 118°05′35.0″ W
(2) West Side:
Latitude | Longtitude
33°44′05.0″ N | 118°05′40.0″ W
33°44′06.0″ N | 118°05′56.5″ W
33°44′01.0″ N | 118°06′01.0″ W
33°43′40.5″ N | 118°06′03.0″ W
33°43′39.5″ N | 118°06′02.0″ W
33°44′05.0″ N | 118°05′40.0″ W
(b) The regulations. (1) This area is reserved for use of naval vessels carrying or transferring ammunition or explosives under standard military restrictions as established by the Safety Manual, Armed Service Explosives Board.
(2) No pleasure or commercial craft shall navigate or anchor within this area at any time without first obtaining permission from the Commanding Officer, Naval Weapons Station, Seal Beach, California. This officer will extend full cooperation relating to public use of the area and will fully consider every reasonable request for the passage of small craft in light of requirements for national security and safety of persons and property.
(3) Nothing in this section shall be construed as relieving the owner or operator of any vessel from the regulations contained in § 334.930 of Title 33, covering navigation in Anaheim Bay Harbor.
(4) The regulations in this section shall be administered by the Commanding Officer U.S. Naval Weapons Station, Seal Beach, California and by such agencies as he may designate, and enforced by the Captain of the Port, Los Angeles-Long Beach, California.
[CGD11-87-07, 53 FR 878, Jan. 14, 1988, as amended by USCG-2015-0433, 80 FR 44281, July 27, 2015]
§ 110.216 Pacific Ocean at Santa Catalina Island, Calif.
(a) The anchorage grounds—(1) Descanso Bay. Shoreward of a line connecting the promontories known as White Rock and Casino Point.
(2) Isthmus Cove. All the waters bounded by a line connecting the following coordinates, beginning at 33°-27′-12″ N, 118°-30′-05″ W (the promontory known as Lion Head); thence southeast to 33°-26′-55.5″ N, 118°-28′-44″ W; thence west-southwest to 33°-26′50″ N, 118°-29′-08″ W; thence southwest to 33°-26′-39″ N, 118°-29′-19″ W; thence along the shoreline returning to the point of origin, excluding the following-described non-anchorage area: an area 300 feet wide (170 feet west and 130 feet east of the centerline of the Catalina Island Steamship Line pier), extending 1600 feet from the foot of the pier, and an area 150 feet seaward of the shoreline extending approximately 1500 feet east and 1500 feet northwest of the centerline of said pier.
Datum: NAD 83
(3) Avalon Bay—(i) Anchorage A. The waters within an area described as follows: A circle of 1350 feet radius centered at 33°20′59.0″ N, 118°18′56.2″ W.
(ii) Anchorage B. The waters within an area described as follows: A circle of 1350 feet radius centered at 33°20′38.3″ N, 118°18′35.8″ W.
(iii) Anchorage C. The waters within an area described as follows: A circle of 1350 feet radius centered at 33°21′21.0″ N, 118°19′16.7″ W.
(b) The regulations. (1) The Descanso Bay anchorage is reserved for yachts and other small craft. Floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes are prohibited.
(2) The Isthmus Cove anchorage shall be available for anchorage of all types of craft. Temporary floats or buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or stakes are prohibited.
(3) The non-anchorage area described in paragraph (a)(2) of this section shall be used only by commercial vessels. Commercial vessels of 15 feet draft or over may anchor in this area seaward of the Catalina Island Steamship Line pier during hours between sunrise and sunset. The use of this area for anchorage is forbidden to all other craft at all times. Fixed mooring piles or stakes and floats or buoys for marking anchors or moorings in place are prohibited.
(4) The instructions of the Captain of the Port requiring vessels to anchor bow and stern, or with two bow anchors, or requiring shifting the anchorage of any vessel within the anchorage grounds for the common safety or convenience, or for otherwise enforcing the regulations in this section, shall be promptly complied with by owners, masters, and persons in charge of vessels.
(5) Nothing in this section shall be construed as relieving the owner or person in charge of any vessels or plant from the penalties of law for obstructing navigation or for obstructing or interfering with range lights, or for not complying with the navigation laws in regard to lights, fog signals, or for otherwise violating law.
(6) The Avalon Bay anchorage is reserved for large passenger vessels of over 1600 gross tons, unless otherwise authorized by the Captain of the Port Los Angeles-Long Beach.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD11-95-001, 60 FR 29759, June 6, 1995; GCD11-04-006, 70 FR 28426, May 18, 2005]
§ 110.218 Pacific Ocean at San Clemente Island, Calif.; in vicinity of Wilson Cove.
(a) The anchorage grounds. Shoreward on a line beginning at a point on the beach bearing 153° true, 1,400 yards, from Wilson Cove Light; thence 62° true, 0.67 nautical mile, thence 332° true, 1.63 nautical miles; thence 241°31′ true to the shore line.
(b) The regulations. (1) This area is reserved exclusively for anchorage of United States Government vessels or vessels temporarily operating under Government direction, and no vessel, except in an emergency, shall anchor in the area without first obtaining permission from the Commandant, Eleventh Naval District, or the Senior Naval Officer present who shall in turn notify the Commandant promptly.
(2) No vessel shall anchor in such a manner as to unreasonably obstruct the approach to the wharf.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CCGD11-85-02, 51 FR 2883, Jan. 22, 1986]
§ 110.220 Pacific Ocean at San Nicolas Island, Calif.; restricted anchorage areas.
(a) The restricted area. All waters within one-quarter nautical mile from the shoreline or manmade structures including mooring buoys, piers and jetties on the easterly end of San Nicolas Island between a point on the northeast shore at latitude 33°14′32″ N, longitude 119°26′41″ W and a point on the southeast shore at latitude 33°13′08″ N, longitude 119°27′06″ W.
(b) The regulations. (1) Except in an emergency, no vessel shall enter into or anchor in this restricted area without permission from the Commanding Officer, Naval Base Ventura County. Cargo and supply vessels or barges destined for San Nicolas Island may anchor in the area for unloading or loading.
(2) Each person in a restricted anchorage shall obey the order or direction of the Commanding Officer, Naval Base Ventura County, USCG Southwest District Commander, or Captain of the Port, Los Angeles-Long Beach, when issued to carry out this section.
(c) Enforcement.The Coast Guard may be assisted in enforcing this rule by other Federal, state, or local agencies.
[USCG-2012-0967, 78 FR 67303, Nov. 12, 2013, as amended by 90 FR 47587, Oct. 2, 2025]
§ 110.222 Pacific Ocean at Santa Barbara Island, Calif.
(a) The anchorage grounds. Shoreward of a line beginning at the Santa Barbara Island Light on the northeast end of the island and bearing 23° true a distance of 1.515 nautical miles seaward from the beach; thence 140°30′ true, 2.54 nautical miles; thence 212°30′ true, 2.30 nautical miles; thence 296°30′ true, 0.96 nautical mile; and thence 325° true to the beach.
(b) The regulations. The anchorage shall be available for anchorage of all types of craft. Temporary floats or buoys for marking anchors in place will be permitted in this area.
§ 110.224 San Francisco Bay, San Pablo Bay, Carquinez Strait, Suisun Bay, Sacramento River, San Joaquin River, and connecting waters, CA.
(a) General regulations. (1) Within the navigable waters of San Francisco Bay, San Pablo Bay, Carquinez Strait, Suisun Bay, New York Slough, San Joaquin River Deep Water Channel, the Stockton Turning Basin, the Sacramento River Deep Water Ship Channel between Suisun Bay and the east end of the West Sacramento Turning Basin, and connecting waters, anchoring is prohibited outside of designated anchorages except when required for safety or with the written permission of the Captain of the Port. Each vessel anchoring outside an established anchorage area shall immediately notify the Captain of the Port of her position and reason for anchoring.
(2) No vessel may permanently moor in areas adjacent to the San Joaquin River Deep Water Channel except with the written permission of the Captain of the Port.
(3) Each vessel anchoring for safety reasons in the San Joaquin River Deep Water Channel, the Sacramento River Deep Water Ship Channel, or the Stockton or West Sacramento Turning Basins shall be positioned as near to the edge of the channel or turning basin as possible so as not to interfere with navigation, or obstruct the approach to any pier, wharf, slip, or boat harbor and shall move as soon as the reason for anchoring no longer exists or when notified to move by the Captain of the Port.
(4) No vessel may anchor within a tunnel, cable, or pipeline area shown on a Government chart.
(5) No vessel may moor, anchor, or tie up to any pier, wharf, or other vessel in such a manner as to extend into an adjacent channel or fairway.
(6) No vessel in such a condition that it is likely to sink or otherwise become a menace or obstruction to navigation or anchorage of other vessels may occupy an anchorage, except when unforeseen circumstances create conditions of imminent peril to personnel and then only for such period as may be authorized by the Captain of the Port.
(7) Each vessel carrying explosives shall only anchor in an explosives anchorage except as authorized by paragraph (a)(1) or (a)(17) of this section.
(8) No vessel other than a vessel under Federal supervision may go alongside or in any manner moor to any Government-owned vessel, mooring buoy, or pontoon boom, their anchor cables, or any of their appendages. No vessel other than a vessel under Federal supervision may obstruct or interfere in any manner with the mooring, unmooring, or servicing of vessels owned by the United States.
(9) The Captain of the Port may require any vessel in a designated anchorage area to moor with two or more anchors.
(10) Each vessel that will not have sufficient personnel on board to weigh anchor at any time shall anchor with two anchors with mooring swivel, unless otherwise authorized by the Captain of the Port.
(11) Deep-draft vessels shall take precedence over vessels of lighter draft in the deeper portions of all anchorages. Light-draft barges and vessels shall anchor away from the deeper portions of the anchorage so as not to interfere with the anchoring of deep-draft vessels. Should circumstances warrant, the Captain of the Port may require lighter draft vessels to move to provide safe anchorage, particularly in Anchorages 7 and 9, for deep-draft vessels.
(12) Barges towed in tandem to any anchorage shall nest together when anchoring.
(13) Each vessel that is notified by the Captain of the Port or his authorized representative to shift her position shall promptly shift her position.
(14) No person may use these anchorages for any purpose other than the purpose stated in these anchorage regulations.
(15) Where these regulations require that a vessel notify the Captain of the Port, the operator of the vessel shall transmit such report to the San Francisco Vessel Traffic Service.
Note:
Vessel Traffic Service guards VHF-FM Channel 13 (156.65 MHz) and Channel 14 (156.70 MHz).
(16) Nothing in this section may be construed as relieving any vessel or the owner or person in charge of any vessel from the penalties of law for obstructing or interfering with range lights or for not complying with the laws relating to lights, day signals, and fog signals and other navigation laws and regulations.
(17) The District Engineer, Corps of Engineers, may issue written permission for anchoring a single barge carrying explosives in quantities considered by the District Engineer as safe and necessary in the vicinity of work being done directly under the District Engineer supervision or under a Department of the Army permit. When issuing such a permit, the District Engineer shall prescribe the conditions under which the explosives must be stored and handled and shall furnish a copy of the permit and a copy of the rules and regulations for storing and handling to the Captain of the Port.
(18) No vessel may anchor in a “dead ship” status (propulsion or control unavailable for normal operations) at any anchorage other than in Anchorage 9 as specified in Table 110.224(D)(1) without prior approval of the Captain of the Port.
(b) Naval anchorages. In addition to the general regulations in paragraph (a) of this section, the following regulations apply to each naval anchorage described in this section.
(1) Naval anchorages are intended for public vessels of the United States, but may be used by other vessels when not required for use by public vessels.
(2) Other vessels using a naval anchorage shall promptly notify the Captain of the Port upon anchoring and upon departure and shall be prepared to move within one hour upon notice should the anchorage be required for public vessels.
(c) Explosive anchorages. In addition to the general regulations in paragraph (a) of this section, the following regulations apply to each explosives anchorage described in this section.
(1) Explosives anchorages and, where established, surrounding forbidden anchorage zones, are temporarily activated as needed by the Captain of the Port. When not activated, explosives anchorages and surrounding forbidden anchorage zones become part of the general anchorage which encompasses them or, if not located within the boundaries of a general anchorage, become available for general navigation.
(2) Notice of activation and deactivation of explosives anchorages will be disseminated by Coast Guard Broadcast Notice to Mariners.
(3) Each vessel which anchors in an explosives anchorage or surrounding forbidden anchorage zone while such anchorage is not activated shall be prepared to move within one hour if the anchorage is activated.
(4) Unless otherwise authorized by the Captain of the Port:
(i) No vessel may anchor in an activated explosives anchorage except vessels loaded with, loading, or unloading explosives.
(ii) No vessel may enter or remain in an activated explosives anchorage except (A) vessels loaded with, loading or unloading explosives, (B) lighters or barges delivering cargo to or from such vessels, or (C) a tug authorized by paragraph (c)(7)(iii) of this section.
(iii) No vessel carrying explosives or on which explosives are to be loaded may enter or remain in an activated explosives anchorage without written permission from the Captain of the Port. Such a permit must be obtained before entering the anchorage and may be revoked at any time.
(iv) No vessel may anchor in the forbidden anchorage zone surrounding an activated explosives anchorage.
(5) Each vessel loaded with, loading, or unloading explosives, while within an explosives anchorage, shall display by day at her masthead, or at least 10 feet above the upper deck if the vessel has no mast, a red flag at least 16 square feet in area.
(6) Each passing vessel shall reduce speed as necessary so as to insure that its wake does not interfere with cargo transfer operations aboard any vessel displaying a red flag in an explosives anchorage.
(7) The Captain of the Port may:
(i) Issue permission to any vessel carrying flammable solids, oxidizing materials, corrosive liquids, flammable liquids, compressed gases, or poisonous substances to occupy a berth in an activated explosives anchorage. Such a permit must be obtained before entering the anchorage and may be revoked at any time.
(ii) Require any person having business on board a vessel which is loaded with, loading, or unloading explosives to have a document that is acceptable to the Coast Guard for identification purposes and to show that document to the Captain of the Port.
(iii) Require a non-self-propelled vessel, or a self-propelled vessel that is unable to maneuver under its own power, that occupies an activated explosives anchorage to be attended by a tug.
(d) Anchorage grounds. (1) Table 110.224(d)(1) lists anchorage grounds, identifies the purpose of each anchorage, and contains specific regulations applicable to certain anchorages.
(2) The geographic boundaries of each anchorage are contained in paragraph (e) of this section.
Table 110.224(d)(1)
Anchorage No. | General location | Purpose | Specific regulations
4 | San Francisco Bay | General | Notes a, b.
5 | ......do | ......do | Do.
6 | ......do | ......do | Note a.
7 | ......do | ......do | Notes a, b, c, d, e.
8 | ......do | ......do | Notes a, b, c.
8A | ......do | ......do | Notes a, b, c, d, e, j, n.
9 | ......do | ......do | Notes a, b, m.
10 | ......do | Naval | Note a.
12 | ......do | Explosives | Notes a, f.
13 | ......do | ......do | Notes a, e, g.
14 | ......do | ......do | Notes a, f, h.
18 | San Pablo Bay | General
19 | ......do | ......do | Note b.
20 | ......do | ......do
21 | ......do | Naval
22 | Carquinez Strait | General
23 | Benicia | General | Notes c, d, e, l.
24 | Carquinez Strait | General | Note j.
26 | Suisun Bay | ......do | Note k.
27 | ......do | ......do
28 | San Joaquin River | ......do
30 | ......do | Explosives
Notes:
a. When sustained winds are in excess of 25 knots each vessel greater than 300 gross tons using this anchorage shall maintain a continuous radio watch on VHF channel 13 (156.65 MHz) and VHF channel 14 (156.70 MHz). This radio watch must be maintained by a person who fluently speaks the English language.
b. Each vessel using this anchorage may not project into adjacent channels or fairways.
c. This anchorage is primarily for use by vessels requiring a temporary anchorage waiting to proceed to pier facilities or other anchorage grounds. This anchorage may not be used by vessels for the purpose of loading any dangerous cargoes or combustible liquids unless authorized by the Captain of the Port.
d. Each vessel using this anchorage may not remain for more than 12 hours unless authorized by the Captain of the Port.
e. Each vessel using this anchorage shall be prepared to move within 1 hour upon notification by the Captain of the Port.
f. The maximum total quantity of explosives that may be on board a vessel using this anchorage shall be limited to 3,000 tons unless otherwise authorized with the written permission of the Captain of the Port.
g. The maximum total quantity of explosives that may be on board a vessel using this anchorage shall be limited to 50 tons except that, with the written permission of the Captain of the Port, each vessel in transit, loaded with explosives in excess of 50 tons, may anchor temporarily in this anchorage provided that the hatches to the holds containing explosives are not opened.
h. Each vessel using this anchorage will be assigned a berth by the Captain of the Port on the basis of the maximum quantity of explosives that will be on board the vessel.
i. [Reserved]
j. Each vessel using this anchorage shall promptly notify the Captain of the Port, upon anchoring and upon departure.
k. See § 162.270 of this title establishing restricted areas in the vicinity of the Maritime Administration Reserve Fleet.
l. Vessels using this anchorage must exceed 15 feet draft, have engines on standby, and have a pilot on board.
m. Any vessel anchoring in a “dead-ship” status shall have one assist tug of adequate bollard pull on standby and immediately available (maximum of 15 minute response time) to provide emergency maneuvering. When the sustained winds are 20 knots or greater, or when the wind gusts are 25 knots or greater, the tug must be alongside.
n. This temporary anchorage will be activated by VTS San Francisco when Anchorages 8 and 9 are at capacity and additional anchorage capacity in the vicinity of Alameda is required. VTS will notify a vessel that this temporary anchorage is activated and available for use when Anchorages 8 and 9 are full, and a vessel requests permission from VTS to anchor in Anchorage 8 or 9.
(e) Boundaries—(1) Anchorage No. 4. Bounded by the west shore of San Francisco Bay and the following lines: Beginning on the shore southwest of Point San Quentin at latitude 37°56′28″ N., longitude 122°28′54″ W.; thence east-southeasterly to latitude 37°55′55″ N., longitude 122°26′49″ W., thence southwesterly to latitude 37°54′13″ N., longitude 122°27′24″ W., thence southeasterly to the shore of Tiburon Peninsula at Point Chauncey at latitude 37°53′40.5″ N., longitude 122°26′55″ W. When Explosives Anchorage No. 13 is activated by the Captain of the Port, it and the forbidden anchorage zone surrounding it are excluded from Anchorage No. 4.
(2) Anchorage No. 5, Southampton Shoal. In San Francisco Bay at Southampton Shoal bounded by a line connecting the following coordinates:
Latitude | Longtitude
37°55′48″ N. | 122°25′52″ W; to
37°55′50″ N. | 122°26′32″ W; to
37°54′49″ N. | 122°26′39″ W; to
37°54′03″ N. | 122°26′06″ W; to
37°53′25″ N. | 122°25′30″ W; to
37°53′23″ N. | 122°25′09″ W; to
37°55′19″ N. | 122°25′33″ W; to
37°55′42″ N. | 122°25′45″ W; thence back to
37°55′48″ N. | 122°25′52″ W.
(3) Anchorage No. 6. Bounded by the east shore of San Francisco Bay and the following lines: Beginning at the shore of the southernmost extremity of Point Isabel at latitude 37°53′46″ N., longitude 122°19′19″ W.; thence westerly along the north shore of Brooks Island to the jetty extending westerly therefrom; thence westerly along the jetty to its bayward end at latitude 37°54′13″ N., longitude 122°23′27″ W.; thence south-southeasterly to latitude 37°49′53″ N.; longitude 122°21′39″ W.; thence southeasterly to latitude 37°49′32.5″ N., longitude 122°21′20.5″ W.; thence easterly to latitude 37°49′34″ N., longitude 122°20′13″ W.; thence east-southeasterly to latitude 37°49′30″ N., longitude 122°19′45.5″ W.; thence east-northeasterly to the shore at Emeryville at latitude 37°50′04″ N., longitude 122°17′41″ W.; excluding from this area, however, the channel to Berkeley Marina delineated by lines joining the following points:
Latitude | Longtitude
37°52′08″ N., | 122°19′07″ W.
37°52′03″ N., | 122°19′17.5″ W.
37°52′00″ N., | 122°19′15.5″ W.
37°51′01″ N., | 122°22′07″ W.
37°50′43″ N., | 122°22′00″ W.
37°50′53″ N., | 122°21′32″ W.
37°51′47″ N., | 122°18′59″ W.
(4) Anchorage No. 7, Treasure Island. In San Francisco Bay at Treasure Island bounded a line connecting the following coordinates:
Latitude | Longtitude
37°49′36″ N., | 122°22′40″ W; to
37°50′00″ N., | 122°22′57″ W; to
37°50′00″ N., | 122°23′44″ W; to
37°49′22.5″ N., | 122°23′44″ W; to
37°48′40.5″ N., | 122°22′38″ W; to
37°49′00.0″ N., | 122°22′16″ W; thence along the shore to
37°49′36″ N., | 122°22′40″ W.
(5) Anchorage No. 8. In San Francisco Bay bounded by the west shore of Alameda Island and the following lines: Beginning at 37°47′52″ N, 122°19′58″ W; thence west-northwesterly to 37°48′02.5″ N 122°21′01.5″ W; thence west-southwesterly to 37°47′51.5″ N, 122°21′40″ W; thence south-southwesterly to 37°47′35.5″ N, 122°21′50″ W; thence south-southeasterly to 37°46′40″ N, 122°21′23″ W; thence easterly to 37°46′36.5″ N, 122°19′52″ W; thence northerly to shore at 37°46′53″ N, 122°19′53.5″ W (NAD 83).
(6) Anchorage No. 8A. In San Francisco Bay bounded by the following lines: Beginning at latitude 37°47′35″ N and longitude 122°21′50″ W; thence south-southwesterly to latitude 37°47′07″ N and longitude 122°22′09″ W; thence south-southeasterly to latitude 37°46′30″ N and longitude 122°21′57″ W; thence easterly along the northern border of Anchorage 9 to latitude 37°46′26″ N and longitude 122°20′42″ W; thence northerly to latitude 37°46′38″ N and longitude 122°20′42″ W; thence westerly along the southern border of Anchorage 8 to latitude 37°46′41″ N and longitude 122°21′23″ W; thence northwesterly along the southwestern border of Anchorage 8 back to the beginning point (NAD 83).
(7) Anchorage No. 9. In San Francisco Bay bounded on the east by the eastern shore of San Francisco Bay and on the north by the southern shore of Alameda Island and a line beginning at 37°46′21.5″ N, 122°19′07″ W; thence westerly to 37°46′30″ N, 122°21′56″ W; thence south-southeasterly to 37°41′45″ N, 122°20′22″ W (San Bruno Channel Light 1); thence south-southeasterly to 37°38′38.5″ N, 122°18′48.5″ W (San Bruno Channel Light 5); thence southeasterly to 37°36′05″ N, 122°14′18″ W; thence northeasterly to shore at 37°37′38.5″ N, 122°09′06.5″ W (NAD 83).
(8) Anchorage No. 10. In San Francisco Bay bounded by the east shore of Sausalito and the following lines: Beginning on the shore of Sausalito at latitude 37°51′20″ N., longitude 122°28′38″ W.; thence southeasterly to latitude 37°50′57.5″ N., longitude 122°27′57″ W.; thence southwesterly to the shore of Sausalito at latitude 37°50′36″ N., longitude 122°28′34″ W.
(9) Anchorage No. 12. In San Francisco Bay east of the city of San Francisco a circular area having a radius of 500 yards centered at latitude 37°44′32.5″ N., longitude 122°20′27.5″ W. A 667-yard-wide forbidden anchorage zone surrounds this anchorage.
(10) Anchorage No. 13. In San Francisco Bay east of the Tiburon Peninsula a circular area having a radius of 333 yards centered at latitude 37°55′26″ N., longitude 122°27′27″ W. A 667-yard-wide forbidden anchorage zone surrounds this anchorage except where such zone would extend beyond the limits of Anchorage No. 4.
Note:
See § 110.224(e)(2) for a description of Anchorage No. 4.
(11) Anchorage No. 14. In San Francisco Bay east of Hunters Point an area 1,000 yards wide and 2,760 yards long, the end boundaries of which are semicircles, with a radii of 500 yards and center, respectively at latitude 37°42′37″ N., longitude 122°19′48″ W. and latitude 37°43′29″ N., longitude 122°19′48″ W. (NAD 83); and the side boundaries of which are parallel tangents joining the semicircles. A forbidden anchorage zone extends 667 yards out from the perimeter on each side.
(12) Anchorage No. 18. In San Pablo Bay bounded by the west shore of San Pablo Bay and the following lines: Beginning at the shore at Point San Pedro at latitude 37°59′16″ N., longitude 122°26′47″ W.; thence easterly to latitude 37°59′16″ N., longitude 122°26′26″ W.; thence northerly to latitude 38°03′46″ N., longitude 122°25′52.5″ W.; thence northwesterly to the shore south of the entrance to Novato Creek at latitude 38°05′13.5″ N., longitude 122°29′04″ W.; excluding from this area, however, the channel to Hamilton Field and the extension of this channel easterly to the boundary of the anchorage, and the pipeline area therein.
(13) Anchorage No. 19. In San Pablo Bay bounded by the northeast shore of San Pablo Bay and the following lines: Beginning at the shore of Tubbs Island at latitude 38°07′39″ N., longitude 122°25′18″ W.; thence southerly to latitude 38°00′36″ N., longitude 122°25′20″ W.; thence northeasterly to latitude 38°03′13″ N., longitude 122°19′46″ W.; thence east-northeasterly to latitude 38°03′37″ N., longitude 122°17′13″ W.; thence northerly to the long dike extending southwesterly from Mare Island at latitude 38°03′52.5″ N., longitude 122°17′10″ W.; thence along the long dike to the shore at Mare Island.
(14) Anchorage No. 20. In San Pablo Bay bounded by the southeast shore of San Pablo Bay and the following lines: Beginning at the northeast corner of Parr Terminal No. 4 at Point San Pablo at latitude 37°57′59″ N., longitude 122°25′35″ W.; thence northeasterly to latitude 38°01′27.5″ N., longitude 122°21′33″ W.; thence east-northeasterly to the Union Oil Co. pier at Oleum at latitude 38°03′18″ N., longitude 122°15′37″ W.; and thence along this pier to the shore.
(15) Anchorage No. 21. In San Pablo Bay south of Mare Island a rectangular area beginning at latitude 38°03′56″ N., longitude 122°15′56″ W.; thence easterly to latitude 38°04′02″ N., longitude 122°15′20″ W.; thence southerly to latitude 38°03′48″ N., longitude 122°15′16″ W.; thence westerly to latitude 38°03′42″ N., longitude 122°15′52″ W.; thence northerly to the point of beginning.
(16) Anchorage No. 22, Carquinez Strait. In Carquinez Strait an area bounded by a line connecting the following coordinates:
Latitude | Longtitude
38°02′36.8″ N. | 122°09′59″ W; to
38°02′06.6″ N. | 122°09′46.7″ W; to
38°01′53.8″ N. | 122°09′00″ W; to
38°02′33.9″ N. | 122°09′00″ W; thence back to
38°02′36.8″ N. | 122°09′59″ W.
(17) Anchorage No. 23, Benicia. In Carquinez Strait an area bounded by a line connecting the following coordinates:
Latitude | Longtitude
38°02′33.9″ N. | 122°09′00″ W; to
38°01′53.8″ N. | 122°09′00″ W; to
38°01′57.4″ N. | 122°08′19.3″ W; to
38°02′33″ N. | 122°08′18.6″ W; thence back to
38°02′33.9″ N. | 122°09′00″ W.
(18) Anchorage No. 24. Bounded by the north shore of Carquinez Strait and the following points: Beginning on the shore at Dillon Point at 38°03′44″ N, 122°11′34″ W; thence southeasterly to 38°03′21″ N, 122°10′43″ W; thence southeasterly to 38°02′36″ N, 122°10′03″ W (Carquinez Strait Light 23); thence to the shore at the Benicia City Wharf at 38°02′40″ N, 122°09′55″ W (NAD 83).
(19) Anchorage No. 26. On the west side of Suisun Bay, adjacent to and northeast of the city of Benicia within the following boundaries:Beginning on the shore northeast of Army Point at latitude 38°02′54″ N., longitude 122°07′37″ W.; thence south-southeasterly along the Southern Pacific bridge to latitude 38°02′38″ N., longitude 122°07′24″ W.; thence easterly to latitude 38°02′42″ N., longitude 122°07′07.5″ W.; thence northeasterly to latitude 38°05′42″ N., longitude 122°04′06″ W.; thence northwesterly to the shore at latitude 38°05′58″ N., longitude 122°04′28″ W.; thence along the shore to the point of beginning.
(20) Anchorage No. 27. In the northeast portion of Suisun Bay bounded by the north shore and the following lines: Beginning on the shore of Grizzly Island at latitude 38°08′13″ N., longitude 122°02′42.5″ W.; thence southerly to tripod at Preston Point on Roe Island at latitude 38°04′16″ N., longitude 122°02′42″ W.; thence along the south shore of Roe Island to latitude 38°04′05″ N., longitude 122°01′35″ W.; thence east-southeasterly to latitude 38°03′42.5″ N., longitude 121°58′54″ W.; thence easterly to the shore of Chipps Island at latitude 38°03′42.5″ N., longitude 121°55′05″ W.
(21) Anchorage No. 28. The area bounded on the east by the shore of Lower Sherman Island and the following lines: Beginning at Point Sacramento on Lower Sherman Island at latitude 38°03′45″ N., longitude 121°50′17.5″ W.; thence southwesterly to latitude 38°03′37.5″ N., longitude 121°50′31″ W.; thence south-southeasterly to latitude 38°02′11″ N.; longitude 121°49′58″ W.; thence to the shore of Lower Sherman Island at latitude 38°02′23″ N., longitude 121°49′49″ W.
(22) Anchorage No. 30. The portion of the Old San Joaquin River Channel bounded on the west by the shore of Mandeville Point and the following lines: Beginning on the shore of Mandeville Point at latitude 38°04′01″ N., longitude 121°32′05″ W.; thence northeasterly to latitude 38°04′07.5″ N., longitude 121°31′58″ W.; thence southeasterly to latitude 38°03′47″ N., longitude 121°31′42.5″ W.; thence westerly to the shore of Mandeville Point at latitude 38°03′47.5″ N., longitude 121°31′56″ W.
[CGD12 84-07, 51 FR 12315, Apr. 10, 1986]
Editorial Note:For Federal Register citations affecting § 110.224, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.228 Columbia River, Oregon and Washington.
(a) Anchorage grounds—(1) Astoria North Anchorage. An area enclosed by a line beginning northeast of Astoria, Oregon, at latitude 46°12′00.79″ N, longitude 123°49′55.40″ W; thence continuing easterly to latitude 46°12′02.00″ N, longitude 123°49′40.09″ W; thence continuing east-northeasterly to latitude 46°13′14.85″ N, longitude 123°46′27.89″ W; thence continuing south-southeasterly to latitude 46°13′00.56″ N, longitude 123°46′16.65″ W; thence continuing southwesterly to latitude 46°11′51.79″ N, longitude 123°49′18.08″ W; thence continuing west-southwesterly to latitude 46°11′46.27″ N, longitude 123°49′43.48″ W; thence continuing west-southwesterly to latitude 46°11′44.98″ N, longitude 123°49′49.44″ W; thence continuing westerly to latitude 46°11′44.32″ N, longitude 123°49′58.88″ W; thence continuing northeasterly to the point of the beginning.
(2) Astoria South Anchorage. An area enclosed by a point beginning east-northeast of Astoria, Oregon, at latitude 46°11′46.95″ N, longitude 123°49′13.04″ W; thence continuing northeasterly to latitude 46°13′02.18″ N, longitude 123°45′54.55″ W; thence continuing easterly to latitude 46°13′05.90″ N, longitude 123°45′41.55″ W; thence continuing southeasterly to latitude 46°12′55.16″ N, longitude 123°45′34.31″ W; thence continuing southwesterly to latitude 46°12′24.32″ N, longitude 123°46′34.70″ W; thence continuing west-southwesterly to latitude 46°11′37.32″ N, longitude 123°49′03.46″ W; thence continuing north-northwesterly to the point of the beginning.
(3) Longview Anchorage. An area enclosed by a line connecting the following points:
Latitude (N) | Longitude (W)
46°06′28.69″ | 122°57′38.33″
46°06′41.71″ | 122°58′01.25″
46°07′22.55″ | 122°59′00.81″
46°07′36.21″ | 122°59′19.29″
46°07′28.44″ | 122°59′31.18″
46°07′14.77″ | 122°59′12.70″
46°06′52.52″ | 122°58′42.62″
46°06′36.96″ | 122°58′16.72″
46°06′28.87″ | 122°58′00.09″
46°06′22.44″ | 122°57′43.27″
(4) Kalama Anchorage. An area to be enclosed by a line beginning north-northwesterly of Sandy Island at latitude 46°01′20.48″ N, longitude 122°52′04.32″ W; thence continuing east-southeasterly to latitude 46°00′57.73″ N, longitude 122°51′35.14″ W; thence continuing east-southeasterly to latitude 46°00′53.95″ N, longitude 122°51′30.29″ W; thence continuing southeasterly to latitude 46°00′35.10″ N, longitude 122°51′15.37″ W; thence continuing south-southeasterly to latitude 45°59′41.48″ N, longitude 122°50′52.40″ W; thence continuing southwesterly to latitude 45°59′38.65″ N, longitude 122°51′05.97″ W; thence continuing north-northwesterly to latitude 46°00′36.82″ N, longitude 122°51′30.90″ W; thence continuing west-northwesterly to latitude 46°00′51.32″ N, longitude 122°51′45.44″ W; thence continuing west-northwesterly to latitude 46°01′24.38″ N, longitude 122°52′21.20″ W; thence continuing northeasterly to the beginning.
(5) Woodland Anchorage. An area enclosed by a line beginning northeast of Columbia City, Oregon, at latitude 45°53′55.31″ N, longitude 122°48′17.35″ W; thence continuing easterly to latitude 45°53′57.11″ N, longitude 122°48′02.16″ W; thence continuing south-southeasterly to latitude 45°53′27.16″ N, longitude 122°47′44.28″ W; thence continuing westerly to latitude 45°53′20.16″ N, longitude 122°48′02.37″ W; thence continuing northwesterly to latitude 45°53′41.50″ N, longitude 122°48′13.53″ W; thence continuing northerly to the point of beginning.
(6) Henrici Bar Anchorage. An area enclosed by a line beginning west-southwesterly of Bachelor Slough, Washington, at latitude 45°47′24.68″ N, longitude 122°46′49.14″ W; thence continuing east-southeasterly to latitude 45°46′44.95″ N, longitude 122°46′13.23″ W, thence continuing southeasterly to latitude 45°46′25.67″ N, longitude 122°46′00.54″ W; thence continuing south-southeasterly to latitude 45°46′02.69″ N, longitude 122°45′50.32″ W; thence continuing southerly to latitude 45°45′43.66″ N, longitude 122°45′45.33″ W; thence continuing southerly to latitude 45°45′37.52″ N, longitude 122°45′44.99″ W; thence continuing westerly to latitude 45°45′37.29″ N, longitude 122°45′53.06 W; thence continuing north-northwesterly to latitude 45°46′15.94″ N, longitude 122°46′10.25″ W; thence continuing west-northwesterly to latitude 45°47′20.20″ N, longitude 122°46′59.28″ W; thence continuing easterly to the point of beginning.
(7) Lower Vancouver Anchorage. An area enclosed by a line beginning north-northeast of Reeder Point at latitude 45°43′39.18″ N, longitude 122°45′27.54″ W; thence continuing south-southwesterly to latitude 45°41′26.95″ N, longitude 122°46′13.83″ W; thence continuing southerly to latitude 45°40′35.72″ N, longitude 122°46′09.98″ W; thence continuing south-southeasterly to latitude 45°40′23.95″ N, longitude 122°46′04.26″ W; thence continuing west-southwesterly to latitude 45°40′20.68″ N, longitude 122°46′16.07″ W; thence continuing northwesterly to latitude 45°40′32.85″ N, longitude 122°46′21.98″ W; thence continuing north-northwesterly to latitude 45°41′01.03″ N, longitude 122°46′26.85″ W; thence continuing northerly to latitude 45°41′29.07″ N, longitude 122°46′26.15″ W; thence continuing north-northeasterly to latitude 45°43′41.27″ N, longitude 122°45′39.87″ W; thence continuing easterly to the point of the beginning. The Vancouver lower anchorage will then resume slightly further upstream at an area north of Kelly point and will be enclosed by a line starting at latitude 45°40′10.09″ N, longitude 122°45′57.53′ W; thence continuing southeasterly to latitude 45°39′42.94″ N, longitude 122°45′44.34″ W; thence continuing west-southwesterly to latitude 45°39′40.07″ N, longitude 122°45′56.34″ W; thence continuing northwesterly to latitude 45°40′06.75″ N, longitude 122°46′09.30″ W; thence continuing east-northeasterly to the point of the beginning.
(8) Kelly Point Anchorage. An area enclosed by a line beginning northeast of Kelly Point, Oregon, at latitude 45°39′10.32″ N, longitude 122°45′36.45″ W; thence continuing east-southeasterly to latitude 45°39′02.10″ N, longitude 122°45′21.67″ W; thence continuing east-southeasterly to latitude 45°38′59.15″ N, longitude 122°45′16.38″ W; thence continuing southwesterly to latitude 45°38′51.03″ N, longitude 122°45′25.57″ W; thence continuing westerly to latitude 45°38′51.54″ N, longitude 122°45′26.35″ W; thence continuing northwesterly to latitude 45°39′06.27″ N, longitude 122°45′40.50″ W; thence continuing north-northeasterly to the beginning point.
(9) Upper Vancouver Anchorage. An area enclosed by a line beginning north-northeast of Hayden Island at latitude 45°38′43.44″ N, longitude 122°44′39.50″ W; thence continuing northeasterly to 45°38′26.98″ N, longitude 122°43′25.87″ W; thence continuing east-northeasterly to latitude 45°38′17.31″ N, longitude 122°42′54.69″ W; thence continuing easterly to latitude 45°38′12.40″ N, longitude 122°42′43.93″ W; thence continuing east-southeasterly to latitude 45°37′40.53″ N, longitude 122°41′44.08″ W; thence south-southeasterly to latitude 45°37′36.11″ N, longitude 122°41′48.86″ W; thence continuing west-southwesterly to latitude 45°37′52.20″ N, longitude 122°42′19.50″ W; thence continuing west-southwesterly to latitude 45°38′10.75″ N, longitude 122°43′08.89″ W; thence continuing southwesterly to latitude 45°38′18.79″ N, longitude 122°43′44.83″ W; thence continuing westerly to latitude 45°38′41.37″ N, longitude 122°44′40.44″ W; thence continuing northeasterly to the point of beginning.
(10) Cottonwood Island Anchorage. The waters of the Columbia River bounded by a line connecting the following points:
Latitude | Longitude
46°05′56.88″ N | 122°56′53.19″ W
46°05′14.06″ N | 122°54′45.71″ W
46°04′57.12″ N | 122°54′12.41″ W
46°04′37.55″ N | 122°53′45.80″ W
46°04′13.72″ N | 122°53′23.66″ W
46°03′54.94″ N | 122°53′11.81″ W
46°03′34.96″ N | 122°53′03.17″ W
46°03′11.61″ N | 122°52′56.29″ W
46°03′10.94″ N | 122°53′10.55″ W
46°03′32.06″ N | 122°53′19.69″ W
46°03′50.84″ N | 122°53′27.81″ W
46°04′08.10″ N | 122°53′38.70″ W
46°04′29.41″ N | 122°53′58.17″ W
46°04′49.89″ N | 122°54′21.57″ W
46°05′06.95″ N | 122°54′50.65″ W
46°05′49.77″ N | 122°56′58.12″ W
(11) Prescott Anchorage. The waters of the Columbia River bounded by a line connecting the following points:
Latitude | Longitude
46°02′47.01″ N | 122°52′53.90″ W
46°02′26.32″ N | 122°52′51.89″ W
46°02′25.92″ N | 122°53′00.38″ W
46°02′46.54″ N | 122°53′03.87″ W
(12) Rice Island Anchorage. All waters in the vicinity of Rice Island, Oregon, bound by a line connecting the following points, which are based on the World Geodetic System (WGS 84):
Table 3 to Paragraph (a)(12)
Latitude | Longitude
46°13′15.60″ | 123°46′28.20″
46°13′37.20″ | 123°45′22.20″
46°14′42.00″ | 123°43′12.00″
46°14′52.80″ | 123°42′12.00″
46°14′42.60″ | 123°42′00.00″
46°13′47.40″ | 123°43′48.60″
46°13′36.60″ | 123°44′15.60″
46°13′07.20″ | 123°45′58.20″
46°13′00.60″ | 123°46′16.80″
(13) [Reserved]
(14) Port Westward Anchorage. All waters in the vicinity of Port Westward, Oregon, bound by a line connecting the following points, which are based on the World Geodetic System (WGS 84):
Latitude | Longitude
46°10′16.80″ | 123°12′58.80″
46°10′48.60″ | 123°11′25.20″
46°10′43.20″ | 123°11′21.60″
46°09′59.40″ | 123°12′46.80″
(b) Regulations. (1) All designated anchorages are intended for the primary use of deep-draft vessels over 200 feet in length.
(2) If a vessel under 200 feet in length is anchored in a designated anchorage, the master or person in charge of the vessel shall:
(i) Ensure that the vessel is anchored so as to minimize conflict with large, deep-draft vessels utilizing or seeking to utilize the anchorage; and
(ii) Move the vessel out of the area if requested by the master of a large, deep-draft vessel seeking to enter or depart the area or if directed by the Captain of the Port.
(3) Vessels desiring to anchor in designated anchorages shall contact the pilot office that manages that anchorage to request an appropriate position to anchor. Columbia River Bar Pilots manage Astoria North Anchorage and Astoria South Anchorage. Columbia River Pilots manage all designated anchorages upriver from Astoria.
(4) No vessel may occupy a designated anchorage for more than 30 consecutive days without permission from the Captain of the Port.
(5) No vessel being laid-up or dismantled or undergoing major alterations or repairs may occupy a designated anchorage without permission from the Captain of the Port.
(6) No vessel carrying a Cargo of Particular Hazard listed in § 126.10 of this chapter may occupy a designated anchorage without permission from the Captain of the Port.
(7) No vessel in a condition such that it is likely to sink or otherwise become a hazard to the operation of other vessels shall occupy a designated anchorage except in an emergency and then only for such periods as may be authorized by the Captain of the Port.
(8) Vessels anchoring in Astoria North Anchorage should avoid placing their anchor in the charted cable area.
[USCG-2008-1232, 74 FR 51781, Oct. 8, 2009, as amended by USCG-2010-0351, 75 FR 36282, June 25, 2010; USCG-2011-0348, 77 FR 50916, Aug. 23, 2012; USCG-2023-0749, 89 FR 96101, Dec. 4, 2024; USCG-2023-0485, 89 FR 101471, Dec. 16, 2024; USCG-2025-0806, 91 FR 36535, June 17, 2026]
§ 110.230 Anchorages, Captain of the Port Puget Sound Zone, WA.
(a) Anchorage grounds. All coordinates are expressed in North American Datum 1983.
(1) Freshwater Bay Emergency Anchorage. All waters of Freshwater Bay and adjacent waters shoreward of a line beginning at Observatory Point, latitude 48°09′03″ N, longitude 123°38′12″ W; thence 000°T to latitude 48°09′36″ N, longitude 123°38′12″ W; thence 090°T to latitude 48°09′36″ N, longitude 123°33′27″ W; thence 180°T ending at Angeles Point, latitude 48°09′00″ N, longitude 123°33′27″ W.
(i) This anchorage may only be assigned to vessels experiencing an emergency that requires anchoring. Vessel emergencies include equipment failures, cargo securing, etc. Vessels requiring a customs inspection will not be allowed to anchor in this area.
(ii) [Reserved]
(2) Bellingham Bay Anchorages—(i) General Anchorage. The waters of Bellingham Bay within a circular area with a radius of 2,000 yards, having its center at latitude 48°44′14.39″, longitude 122°32′26.62″.
(ii) Explosives Anchorage. The waters of Bellingham Bay within a circular area with a radius of 1,000 yards, having its center at latitude 48°42′47.39″, longitude 122°33′41.62″.
(3) Port Townsend Anchorages—(i) Fair weather explosives anchorage area. A circular area having a radius of 300 yards, whose center is at latitude 48°06′25.30″, longitude 122°43′50.60″.
(ii) Foul weather explosives anchorage area. A circular area having a radius of 300 yards, whose center is at latitude 48°04′4.33″, longitude 122°44′56.60″.
(4) Holmes Harbor General Anchorage. All waters of Holmes Harbor lying south of a line between latitude 48°05′50″ N, longitude 122°31′24″ W; thence 311°T to latitude 48°07′03″ N, longitude 122°33′31″ W.
(5) Port Gardner General Anchorage. All waters in a quadrilateral area bounded as follows: Beginning at latitude 47°58′57″ N, longitude 122°14′05″ W; thence 302°T to latitude 47°59′21.5″ N, longitude 122°15′02″ W; thence 229°T to latitude 47°58′57″ N, longitude 122°15′44″ W; thence 122°T to latitude 47°58′32.5″ N, longitude 122°14′47″ W; thence 048°T to point of origin.
(6) Thorndike Bay Emergency Explosives Anchorage. All waters in a quadrilateral area bounded as follows: Beginning at latitude 47°47′59″ N, longitude 122°43′30″ W; thence 270°T to latitude 47°47′59″ N, longitude 122°44′30″ W; thence 180°T to latitude 47°47′30″ N, longitude 122°44′30″ W; thence 090°T to latitude 47°47′30″ N, longitude 122°43′30″ W, thence 000°T to point of origin.
(7) Elliott Bay Anchorages—(i) Smith Cove West General Anchorage. All waters inside the area beginning at latitude 47°38′20.44″ N, longitude 122°24′48.56″ W; thence 207T to latitude 47°37′51.6″ N, longitude 122°25′10.5″ W; thence 124°T to latitude 47°36′56.2″ N, longitude 122°23′07″ W; thence 000°T to latitude 47°37′59.5″ N, longitude 122°23′07″ W; thence northwest along the shoreline to the point of origin.
(ii) Smith Cove East General Anchorage. All waters inside the area beginning at latitude 47°37′36.2″ N, longitude 122°22′43″ W; thence 180°T to latitude 47°36′56.2″ N, longitude 122°22′43″ W; thence 090°T to latitude 47°36′56.2″ N, longitude 122°21′22.5″ W, thence northwest along the shoreline to the point of origin.
(iii) Elliott Bay East General Anchorage. All waters inside the area beginning at latitude 47°35′25.8″ N, longitude 122°20′45.5″ W; thence 000°T to latitude 47°35′55.85″ N, longitude 122°20′45.5″ W; thence 270°T to latitude 47°35′55.85″ N, longitude 122°21′30″ W; thence 180°T to latitude 47°35′19.2″ N, longitude 122°21′30″ W; thence east along the shoreline to the point of origin.
(iv) Elliott Bay West General Anchorage. All waters inside the area beginning at latitude 47°35′30″ N, longitude 122°21′41″ W, thence 000°T to latitude 47°35′45.5″ N, longitude 122°21′41″ W; thence 336°T to latitude 47°35′55.85″ N, longitude 122°21′48.5″ W; thence 270°T to latitude 47°35′55.85″ N, longitude 122°23′16.46″ W, thence 180°T to Duwamish Head thence southeast following the shoreline to latitude 47°35′30″ N, longitude 122°22′54.5″ W; thence 090°T to the point of origin.
(8) Yukon Harbor General Anchorage. All waters inside the area beginning at latitude 47°33′54.66″ N, longitude 122°31′54.68″ W; thence 106°T to latitude 47°33′23″ N, longitude 122°29′05″ W; thence 180°T to latitude 47°32′39.5″ N, longitude 122°29′05″ W; thence south along the eastern shoreline of Blake Island to latitude 47°31′48″ N, longitude 122°29′21″ W; thence 250°T to latitude 47°31′20.5″ N, longitude 122°31′10″ W; thence west and north along the Kitsap Peninsula shoreline to the point of origin.
(9) Cherry Point General Anchorage. The waters within a circular area with a radius of 1600 yards, having its center at latitude 48°48′29.39″ N, longitude 122°46'04.66” W.
(10) Anacortes General Anchorages—(i) Anacortes East (ANE) Anchorage. The waters within a circular area with a radius of 600 yards, having its center at 48°31′27″ N., 122°33′45″ W.
(ii) Anacortes Center (ANC) Anchorage. The waters within a circular area with a radius of 600 yards, having its center at 48°30′54″ N, 122°34′06″ W.
(iii) Anacortes West (ANW) Anchorage. The waters within a circular area with a radius of 600 yards, having its center at 48°31′09″ N, 122°34′55″ W.
(11) Cap Sante Tug and Barge General Anchorage. The Cap Sante Tug and Barge General Anchorage includes all waters enclosed by a line connecting the following points: 48°31′16″ N, 122°36′00″ W, which is approximately the northeast tip of Cap Sante; then southeast to 48°30′53″ N, 122°35′28″ W; then west southwest to 48°30′45″ N, 122°35′52″ W, approximately the south tip of Cap Sante; then north along the shoreline to the point of origin.
(12) Hat Island Tug and Barge General Anchorage. The Hat Island Tug and Barge General Anchorage includes all waters enclosed by a line connecting the following points: 48°31′19″ N, 122°33′04″ W, near the west side of Hat Island; then southwest to 48°30′37″ N, 122°33′38″ W; then east to 48°30′37″ N, 122°32′00″ W; then northwest to the point of origin.
(13) Commencement Bay General Anchorage. A quadrilateral area bounded as follows: Beginning at latitude 47°17′36.36″ N, longitude 122°26′04.45″ W; thence due south to latitude 47°17′18.36″ N, longitude 122°26′04.45″ W; thence due east to latitude 47°17′18.36″ N, longitude 122°25′04.45″ W; thence due north to latitude 47°17′32.36″ N, longitude 122°25′04.45″ W; thence west northwest to the point of origin.
(14) Non-anchorage area Port Angeles Harbor. Beginning at a point on the shore at latitude 48°07′03.83″ N, longitude 123°24′20.67″ W; thence to latitude 48°07′38.43″ N, longitude 123°24′04.67″ W; thence to latitude 48°07′36.03″ N, longitude 123°23′50.67″ W; thence to a point on the shoreline at latitude 48°06′56.73″ N, longitude 123°24′08.67″ W.
(i) No vessel may anchor in this non-anchorage area at any time.
(ii) Dragging, seining, fishing, or other activities which may foul underwater installations within this non-anchorage area are prohibited.
(iii) Vessels may transit this non-anchorage area, but must proceed by the most direct route and without unnecessary delay.
Note to paragraph (a)(14):
The city of Port Angeles will mark this area with signs on the shoreline visible (during normal daylight) 1 mile to seaward reading, “Do not Anchor in This Area.”
(b) The regulations. (1) No vessel shall anchor in any general anchorage described in paragraph (a) of this section without prior permission from the Captain of the Port (COTP), or his authorized representative. Vessel Traffic Service Puget Sound is designated as the COTP's authorized representative. All vessels should seek permission at least 48 hours prior to arrival at the anchorage area in order to avoid unnecessary delays.
(i) Except for the Anacortes General Anchorages, a berth in a general anchorage, if available, may be assigned to any vessel by the Captain of the Port or his authorized representative upon application and he may grant revocable permits for the continuous use of the same berth. For the Anacortes General Anchorages, the following hierarchy will be applied for assignment of a berth: tankers conducting lightering operations, then loaded tankers, and then all other vessels.
(ii) Tugs and oil barges using the Cap Sante and Hat Island General Anchorages are exempt from the requirement to obtain the COTP's permission.
(2) Except for the Anacortes General Anchorages, no vessel shall occupy any general anchorage for a period longer than 30 days unless a permit is obtained from the Captain of the Port for that purpose. There is a 10 days maximum stay at the Anacortes East and Anacortes Center general anchorages, and 6 day maximum stay at the Anacortes West general anchorage.
(3) The COTP or his authorized representative may require vessels to depart from the Anacortes General Anchorage before the expiration of the authorized or maximum stay. The COTP or his authorized representative will provide at least 24-hour notice to a vessel required to depart the Anacortes General Anchorage.
(4) No vessel in a condition such that it is likely to sink or otherwise become a menace or obstruction to the navigation or anchorage of other vessels shall occupy any general anchorage except in an emergency and then only for such period as may be permitted by the Captain of the Port.
(5) Within the Anacortes General Anchorages, lightering operations shall only be conducted in the Anacortes West and Anacortes Center anchorages.
(6) Tugs and barges using the Cap Sante and Hat Island Barge General Anchorages are required to ensure their vessels and barges do not project beyond the holding area's boundaries. The tug must be manned, remain in attendance with the barge and maintain a communications guard with VTS on an appropriate VTS VHF radio working frequency, which is currently channel 5A.
(7) No vessel shall anchor in any general anchorage described in paragraph (a) of this section without prior permission from the Captain of the Port, or his authorized representative. No vessel shall occupy any general anchorage for a period longer than 30 days unless a permit is obtained from the Captain of the Port for that purpose. No vessel in a condition such that it is likely to sink or otherwise become a menace or obstruction to the navigation or anchorage of other vessels shall occupy a general anchorage except in an emergency and then only for such period as may be permitted by the Captain of the Port. A berth in a general anchorage, if available, may be assigned to any vessel by the Captain of the Port upon application and he may grant revocable permits for the continuous use of the same berth.
(8) Explosive anchorages are reserved for vessels carrying explosives. All vessels carrying explosives shall be within these areas when anchored.
(9) Whenever any vessel not fitted with mechanical power, anchors in an explosive anchorage, the Captain of the Port may require the attendance of a tug upon such vessel, when, in his judgment, such action is necessary.
(10) Vessels carrying explosives shall comply with the general regulations in paragraph (b)(1) of this section, when applicable.
(11) Every vessel at anchor in an explosives anchorage shall display by day a red flag at least 16 square feet in area at its mast head or at least 10 feet above the upper deck if the vessel has no mast, and by night a red light in the same position specified for the flag. These signals shall be in addition to day signals and lights required to be shown by all vessels when at anchor.
(12) Every vessel constructed of wood shall, unless there are steel bulwarks or metallic cases or cargo on board, be fitted with radar reflector screens of metal of sufficient size to permit target indication on the radar screen of commercial type radars.
(13) Fishing and navigation by pleasure and commercial craft are prohibited within the area at all times when vessels which are anchored in the area for the purpose of loading or unloading explosives display a red flag by day and a red light by night, unless special permission is granted by the Captain of the Port.
(14) No explosives handling in any explosive anchorage will be undertaken by any vessel unless personnel from the Captain of the Port are on board to supervise the handling of explosives.
(15) No vessel shall remain at anchor in any explosive anchorage unless there is on board such vessel a competent watchman or a tug in attendance.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967]
Editorial Note:For Federal Register citations affecting § 110.230, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 110.231 Ketchikan Harbor, Alaska, Large Passenger Vessel Anchorage.
(a) The anchorage grounds. Ketchikan Harbor, Alaska, Large Passenger Vessel Anchorage. The waters of Ketchikan Harbor, Ketchikan, Alaska, enclosed by the following boundary lines: A line from Thomas Basin Entrance Light “2” to East Channel Lighted Buoy “4A”, to Pennock Island Reef Lighted Buoy “PR”, to Wreck Buoy “WR6”, then following a line bearing 064 degrees true to shore. This anchorage is effective 24 hours per day from 1 May through 30 September, annually.
(b) The regulations. (1) When transiting through the anchorage, all vessels using propulsion machinery shall proceed across the anchorage by the most direct route and without unnecessary delay. Sudden course changes within the anchorage are prohibited.
(2) No vessels, other than a large passenger vessel of over 1600 gross tons, (including ferries), may anchor within the anchorage without the express consent of the Captain of the Port, Southeast Alaska.
[CGD17-99-002, 64 FR 29558, June 2, 1999]
§ 110.233 Prince William Sound, Alaska.
(a) The anchorage grounds. In Prince William Sound, Alaska, beginning at a point at latitude 60°40′00″ N., longitude 146°40′00″ W.; thence south to latitude 60°38′00″ N., longitude 146°40′00″ W.; thence east to latitude 60°38′00″ N., longitude 146°30′00″ W.; thence north to latitude 60°39′00″ N., longitude 146°30′00″ W.; thence northwesterly to the beginning point.
(b) The regulations. (1) This anchorage area is for the temporary use of vessels during:
(i) Adverse weather or tidal conditions;
(ii) Vessel equipment failure; or
(iii) Delays at Port Valdez;
(2) No vessel may anchor in this anchorage without notifying the vessel traffic center in Valdez; and
(3) Each vessel anchored shall notify the vessel traffic center in Valdez when it weighs anchor.
[CGD 77-144, 43 FR 21459, May 18, 1978]
§ 110.235 Pacific Ocean (Mamala Bay), Honolulu Harbor, Hawaii (Datum: NAD 83).
(a) The anchorage grounds—(1) Anchorage A. The waters bounded by the arc of a circle with a radius of 350 yards with the center located at:
Latitude | Longitude
21°16′57″ N | 157°53′12″ W
(2) Anchorage B. The waters bounded by a line connecting the following coordinates:
Latitude | Longtitude
21°17′06″ N | 157°54′40″ W; to
21°17′22″ N | 157°54′40″ W; to
21°17′22″ N | 157°54′19″ W; to
21°17′06″ N | 157°54′19″ W; and thence to
21°17′06″ N | 157°54′40″ W
(3) Anchorage C. The waters bounded by the arc of a circle with a radius of 450 yards with the center located at:
Latitude | Longtitude
21°17′09″ N | 157°54′55″ W
(4) Anchorage D. The waters bounded by the arc of a circle with a radius of 450 yards with the center located at:
Latitude | Longtitude
21°17′21″ N | 157°55′20″ W
(b) The regulations. (1) Anchors must be placed inside the anchorage areas.
(2) The anchorages are general anchorages for commercial vessels. Anchorage A should be used only if Anchorages B, C, and D are full.
(3) No bunkering operations or vessel to vessel transfer of oil in bulk of any kind is permitted within Anchorage A.
(4) Nothing in this section shall be construed as relieving the owner or person in charge of any vessel from complying with the rules of navigation and with safe navigation practice.
(c) Before entering into the anchorage grounds in this section you must first obtain permission from the Captain of the Port Honolulu.
[CGD14-93-003, 59 FR 40820, Aug. 10, 1994, as amended by CGD14-03-001, 68 FR 20346, Apr. 25, 2003]
§ 110.236 Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages.
(a) The anchorage grounds—(1) Anchorage A. The waters within an area described as follows: A circle of 1,000 feet radius centered at latitude 21°17′43.6″ N., longitude 158°07′36.1″ W. (Datum NAD 83)
(2) Nonanchorage area A. The waters extending 300 feet on either side of a line bearing 059° from anchorage A to the shoreline at latitude 21°18′10.6″ N., longitude 158°06′47.1″ W. (Datum NAD 83)
(3) Anchorage B. The waters enclosed by a line beginning at latitude 21°16′20.1″ N., longitude 158°04′59.1″ W.; thence to latitude 21°15′52.5″ N., longitude 158°05′7″ W.; thence to latitude 21°15′59.7″ N., longitude 158°05′35.9″ W.; thence to latitude 21°16′27.4″ N., longitude 158°05′28″ W.; thence to the point of beginning. (Datum NAD 83)
(4) Nonanchorage area B. The waters extending 300 feet on either side of a line bearing 334.5° from anchorage B to the shoreline at latitude 21°17′39.1″ N., longitude 158°06′03.2″ W. (Datum NAD 83)
(5) Anchorage C. The waters enclosed by a line beginning at latitude 21°16′46.6″ N., longitude 158°04′29.1″ W.; thence to latitude 21°16′46.6″ N., longitude 158°04′02.1″ W.; thence to latitude 21°16′32.6″ N., longitude 158°04′02.1″ W.; thence to latitude 21°16′32.6″ N., longitude 158°04′29.1″ W.; thence to the point of beginning. (Datum NAD 83)
(6) Nonanchorage area C. The waters extending 300 feet on either side of a line bearing 306° from anchorage C to the shoreline at latitude 21°17′42.6″ N., longitude 158°05′57.9″ W. (Datum NAD 83)
(7) Anchorage D. The waters enclosed by a line beginning at latitude 21°17′48.6″ N., longitude 158°07′10.1″ W.; thence to latitude 21°17′44.6″ N., longitude 158°07′06.1″ W.; thence to latitude 21°17′37.6″ N., longitude 158°07′14.1″ W.; thence to latitude 21°17′41.6″ N., longitude 158°07′18.1″ W.; thence to the point of beginning. (Datum NAD 83)
(b) The regulations. (1) No vessels may anchor, moor, or navigate in anchorages A, B, C, or D except:
(i) Vessels using the anchorages and their related pipelines for loading or unloading;
(ii) Commercial tugs, lighters, barges, launches, or other vessels engaged in servicing the anchorage facilities or vessels using them;
(iii) Public vessels of the United States.
(2) When vessels are conducting loading or unloading operations as indicated by the display of a red flag (international code flag B) at the masthead, passing vessels of over 100 gross tons shall not approach within 1,000 yards at a speed in excess of 6 knots.
(3) The owner of any vessel wanting to use an anchorage ground and use of the related pipeline facilities shall notify the Captain of the Port, Honolulu, Hawaii, and the Commanding Officer, U.S. Naval Air Station, Barbers Point, Hawaii, at least 24 hours in advance of desired occupancy of the anchorage ground by the vessel. Such notification must include the maximum height above the waterline of the uppermost portion of the vessel's mast and a description of the masts' lighting including height of the highest anchor light and any aircraft warning lights to be displayed by the vessel at night.
(4) When, in the opinion of the Captain of the Port, or his authorized representative, oil transfer operations within these anchorages could jeopardize the safety of vessels or facilities in the area, or cause an undue risk of oil pollution, such oil transfer operations shall be immediately terminated until such time as the cognizant Coast Guard officer determines that the danger has subsided.
(5) Nonanchorage areas A, B, and C are established for the protection of submerged pipelines. Except for vessels servicing pipeline facilities, no anchoring, dragging, seining or other potential pipeline fouling activities are permitted within these areas.
(6) Nothing in this section shall be construed as relieving the owner or person in charge of any vessel from complying with the rules of the road and safe navigation practice.
(7) The regulations of this section are enforced by the Captain of the Port or his duly authorized representative.
[CGD 73-59R, 38 FR 16777, June 26, 1973, as amended by CGD 96-026, 61 FR 33663, June 28, 1996; USCG-2002-12471, 67 FR 41332, June 18, 2002]
§ 110.237 Pacific Ocean at Waimea, Hawaii, Naval Anchorage.
(a) The Anchorage grounds. All the waters within a circle having a radius of 300 yards centered at latitude 21°56′50.7″ N., longitude 159°41′22.9″ W. (Datum NAD 83)
(b) The regulation. Except in an emergency, no vessel except a Naval vessel may anchor or moor in this anchorage without permission of the Captain of the Port, Honolulu, Hawaii.
[CGD 74-187, 41 FR 54176, Dec. 13, 1976, as amended by CGD 96-026, 61 FR 33663, June 28, 1996; USCG-2002-12471, 67 FR 41332, June 18, 2002]
§ 110.238 Apra Harbor, Guam.
(a) The anchorage grounds (Datum: WGS 84)—(1) General Anchorage. The waters bounded by a line connecting the following points:
Latitude | Longtitude
13°27′32.0″ N | 144°39′36.8″ E
13°27′21.0″ N | 144°39′22.8″ E
13°27′12.5″ N | 144°37′25.4″ E
and thence along the shoreline to
Latitude | Longtitude
13°27′45.5″ N | 144°39′34.8″ E
and thence to the point of beginning.
(2) Explosives Anchorage 701. The water in Naval Anchorage A bounded by the arc of a circle with a radius of 350 yards and located at:
Latitude | Longtitude
13°26′54.0″ N | 144°37′53.5″ E
(3) Naval Explosives Anchorage 702. The waters in the General Anchorage bounded by the arc of a circle with a radius of 350 yards and with the center located at:
Latitude | Longtitude
13°27′29.9″ N | 144°38′13.0″ E
(4) Naval Anchorage A. The waters bounded by a line connecting the following points:
Latitude | Longtitude
13°26′47.3″ N | 144°37′42.6″ E
13°27′02.0″ N | 144°37′42.6″ E
13°27′10.6″ N | 144°39′00.8″ E
13°26′59.6″ N | 144°39′00.8″ E
13°26′59.6″ N | 144°39′08.6″ E
13°26′54.3″ N | 144°39′08.6″ E
13°26′54.3″ N | 144°39′24.2″ E
13°26′42.2″ N | 144°39′24.2″ E
13°26′40.4″ N | 144°38′01.8″ E
and thence to the point of beginning.
(5) Naval Anchorage B. The waters bounded by a line connecting the following points:
Latitude | Longtitude
13°26′43.7″ N | 144°39′53.3″ E
13°26′53.6″ N | 144°40′03.8″ E
13°26′51.0″ N | 144°40′06.0″ E
13°26′41.0″ N | 144°39′56.0″ E
and thence along the shoreline to the point of beginning.
(b) The regulations—(1) General Anchorage. Any vessel may anchor in the General Anchorage except vessels carrying more than 25 tons of high explosives.
(2) Explosives Anchorage 701. Vessels carrying more than 25 tons of high explosives must use Anchorage 701, unless otherwise directed by the Captain of the Port.
(3) Naval Explosives Anchorage 702. Except Naval vessels using the anchorage as directed by local Naval authorities, no vessel may anchor so that any part of the hull or rigging, or the anchor tackle may extend into Anchorage 702 at any time.
(4) Naval Anchorages A and B. (i) Except as provided in paragraph (b)(3)(ii) of this section, non-naval vessels may not anchor within these anchorages or use the mooring buoys therein without permission of the local Naval authorities obtained through the Captain of the Port. (There is a user charge for the use of these mooring buoys.)
(ii) Small craft that are continuously manned and capable of getting underway may anchor within these anchorages during daylight hours without prior approval of the Captain of the Port.
(5) General regulations. (i) Vessels may use the Naval mooring buoys in the General Anchorage without charge for a period up to 72 hours if authorized by the Captain of the Port. Vessels so moored shall promptly move at their own expense upon notification from the Captain of the Port.
(ii) Except for vessels not more than 65 feet in length, all vessels shall anchor in an anchorage ground.
(iii) Vessels anchored in an anchorage ground shall place their anchors within the anchorage ground so that no portion of the hull or rigging at any time extends outside the anchorage ground.
(iv) No vessel may anchor in the harbor for more than 30 consecutive days without permission of the Captain of the Port.
[CDG14-87-02, 52 FR 25864, July 9, 1987, as amended by CGD14-89-01, 55 FR 27465, July 3, 1990]
§ 110.239 Island of Tinian, CNMI.
(a) The anchorage grounds (based on 1944 Saipan Datum):
(1) Explosives Anchorage A. A circular area intersecting the shoreline having a radius of 1,900 yards centered at latitude 14°58′57.0″ N, longitude 145°35′40.8″ E.
(2) Explosives Anchorage B. A circular area intersecting the shoreline having a radius of 1,900 yards centered at latitude 14°58′15.9″ N, longitude 145°35′54.8″ E.
(b) The regulations: Explosives Anchorages A and B; with the exception of explosives laden naval vessels at explosives anchorage A and B, no vessel may anchor within these areas without permission of the Captain of the Port. No vessel of more than 500 gross tons displacement may enter these areas except for the purpose of anchoring in accordance with this section.
[CGD 14-87-01, 52 FR 26146, July 13, 1987]
§ 110.240 San Juan Harbor, P.R.
(a) The anchorage grounds—(1) Temporary Anchorage E (general). Beginning at a point which bears 262° T, 878 yards from Isla Grande Aero Beacon; thence along a line 75°47′, 498 yards; thence along a line 134°49′, 440 yards; thence along a line 224°49′ to the northerly channel limit of Graving Dock Channel, and thence to the point of beginning.
(2) Restricted Anchorage F. Beginning at a point which bears 212°30′, 1,337.5 yards from Isla Grande Light; thence along a line 269°00′, 550 yards; thence along a line 330°00′ to the westerly channel limit of Anegado Channel; and thence along the westerly channel limit of Anegado Channel to the point of beginning.
(b) The regulations. (1) Vessels awaiting customs or quarantine shall use Temporary Anchorage E. No vessel shall remain in this anchorage more than 24 hours without a permit from the U.S. Coast Guard Captain of the Port.
(2) Restricted Anchorage F shall serve both as an additional general anchorage area in cases where the temporary anchorage is full, and as an explosives anchorage for vessels loading or unloading explosives in quantities no greater than forty (40) tons, Commercial Class “A” Explosives, when so authorized by the United States Coast Guard Captain of the Port. No vessel shall enter or anchor therein without first obtaining a permit from the United States Coast Guard Captain of the Port.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD 79-119, 45 FR 32673, May 19, 1980; CGD 7-83-29, 49 FR 48540, Dec. 13, 1984; 50 FR 5580, Feb. 11, 1985]
§ 110.245 Vieques Passage and Vieques Sound, near Vieques Island, P.R.
(a) The anchorage grounds—(1) Vieques Passage explosives anchorage and ammunition handling berth (Area 1). A circular area having a radius of 1,700 yards with its center at latitude 18°09′00″ N., longitude 65°32′40″ W.
(2) Vieques Sound explosives anchorage and ammunition handling berth (Area 2). A circular area having a radius of 2,000 yards with its center at latitude 18°11′48″, longitude 65°26′06″.
(3) Southern Vieques Passage explosives anchorage and ammunition handling berth (Area 3). A circular area having a radius of 2,000 yards with its center at latitude 18°05′51″, longitude 65°36′14″.
(b) The regulations. (1) No vessel or craft shall enter or remain in these anchorages while occupied by vessels having on board explosives or other dangerous cargo. Explosives in quantities no greater than 1,625 short tons will be handled in any area at one time.
(2) The regulations of this section shall be enforced by the Commander, Coast Guard Sector, San Juan, Puerto Rico, and such agencies as he may designate.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by CGD 77-067, 44 FR 50040, Aug. 27, 1979; USCG-2008-0179, 73 FR 35012, June 19, 2008]
§ 110.250 St. Thomas Harbor, Charlotte Amalie, V.I.
(a) The anchorage grounds—(1) Inner harbor anchorage. Beginning at a point bearing 85°, 525 yards from the outer end of a pier at latitude 18°20′19″, longitude 64°56′26″ (approximate); thence 146°, 800 yards; thence 70°, 860 yards; thence 340°, 500 yards; and thence to the point of beginning.
(2) Outer harbor anchorage. Beginning at Scorpion Rock lighted buoy No. 1 (latitude 18°19′25.6″, longitude 64°55′41.8″); thence 180°, 1,580 yards; thence 264°30′, 2,490 yards; thence due north 1,255 yards; thence due east to the southerly tip of Sprat Point, Water Island; thence to Cowell Point, Hassel Island; and thence to the point of beginning.
(3) East Gregerie Channel anchorage (general purpose). Bounded on the northeast by Hassel Island; on the southeast by the northwest boundary of the outer harbor anchorage; on the southwest by Water Island; and on the northwest by a line running from Banana Point, Water Island, 55° to Hassel Island.
(4) Small-craft anchorage. All the waters north of a line passing through the outer end of a pier at latitude 18°20′19″, longitude 64°56′26″ (approximate) and ranging 85°.
(5) Deep-draft anchorage. A circular area having a radius of 400 yards with its center at latitude 18°19′12.2″, longitude 64°58′47.8″.
(6) Long Bay anchorage. The waters of Long Bay bounded on the north by the southerly limit line of Anchorage E, on the west by the easterly limit line of Anchorage A to a point at latitude 18°20′18″, thence to latitude 18°20′13″, longitude 64°55′21″; and thence to the shoreline at latitude 18°20′15″, longitude 64°55′13″.
(b) The regulations. (1) The outer harbor anchorage shall be used by vessels undergoing examination by quarantine, customs, immigration, and Coast Guard officers. Upon completion of these examinations, vessels shall move promptly to anchorage. This anchorage shall also be used by vessels having drafts too great to permit them to use the inner harbor anchorage. No vessel shall remain more than 48 hours in this anchorage without a permit from the Harbor Master.
(2) The small-craft anchorage shall be used by small vessels undergoing examination and also by small vessels anchoring under permit from the Harbor Master.
(3) The requirements of the Navy shall predominate in the deep-draft anchorage. When occupied by naval vessels all other vessels and craft shall remain clear of the area. When the area is not required for naval vessels, the Harbor Master may upon application made in advance assign other vessels to the area. Vessels so assigned and occupying the area shall move promptly upon notification by the Harbor Master.
(4) The harbor regulations for the Port of St. Thomas, V.I. of the United States and approaches thereto, including all waters under its jurisdiction, as adopted by the Government of the Virgin Islands, will apply to the Long Bay Anchorage.
(5) In addition, the Long Bay Anchorage is reserved for all types of small vessels, including sailing and motor pleasure craft, and such craft shall anchor in no other area except Anchorage E, in the northern portion of the harbor of Charlotte Amalie.
(6) Floats for marking anchors in place will be allowed in the Long Bay anchorage; stakes or mooring piles are prohibited.
(7) Vessels not more than 65 feet in length are not required to exhibit or carry anchor lights within the Long Bay anchorage, but must display them if emergency requires anchoring in any other part of the harbor.
(8) No vessel may anchor in any of the St. Thomas Harbor Anchorages without a permit from the Harbor Master.
(9) The Coast Guard Captain of the Port San Juan is hereby empowered, whenever the maritime or commercial interests of the United States so require, to shift the position of any vessel anchored within the Long Bay anchorage, and of any vessel which is so moored or anchored as to impede or obstruct vessel movement in the harbor, and to enforce all regulations of this section should the need arise.
[CGFR 67-46, 32 FR 17728, Dec. 12, 1967, as amended by USCG-2008-0179, 73 FR 35012, June 19, 2008]
§ 110.255 Ponce Harbor, P.R.
(a) Small-craft anchorage. On the northwest of Ponce Municipal Pier and northeast of Cayitos Reef, bounded as follows: Beginning at latitude 17°58′27″, longitude 66°37′29.5″, bearing approximately 325° true, 2,200 feet from the most southwest corner of Ponce Municipal Pier; thence 273°30′ true, 1,800 feet; thence 15° true, 900 feet; thence 93°30′ true, 1,800 feet; thence 195° true, 900 feet to the point of beginning.
(b) The regulations. (1) The Commonwealth Captain of the Port may authorize use of this anchorage whenever he finds such use required in safeguarding the maritime or commercial interests.
(2) No vessel shall anchor within the area until assigned a berth by the Commonwealth Captain of the Port. Application for permission to occupy the anchorage must be submitted in advance by the master or authorized representative of the vessel.
(3) Vessels occupying the anchorage will at all times keep within the limits of the area, and shall move or shift their position promptly upon notification by the Commonwealth Captain of the Port.
(4) The anchorage is reserved for all types of small craft, including schooners, fishing vessels, yachts and pleasure craft.
(5) Floats for marking anchors in place will be allowed; stakes or mooring piles are prohibited.
SUBCHAPTER J BRIDGES
PART 114 GENERAL
Authority: 33 U.S.C. 401, 406, 491, 494, 495, 499, 502, 511, 513, 514, 516, 517, 519, 521, 522, 523, 525, 528, 530, 533, and 535(c), (e), and (h); 14 U.S.C. 503; 49 U.S.C. 1655(g); Pub. L. 107-296, 116 Stat. 2135; 33 CFR 1.05-1 and 1.01-60, DHS Delegation No. 00170.1, Revision No. 01.4.
Source: CGFR 67-46, 32 FR 17769, Dec. 12, 1967, unless otherwise noted.
§ 114.01 Purpose.
(a) The purpose of the rules and regulations in this subchapter is to implement certain laws and set forth the requirements for:
(1) Locations and clearances of bridges and causeways over the navigable waters;
(2) Administration of the alteration of unreasonably obstructive bridges; and
(3) Regulation of drawbridge operation.
(b) The rules and regulations in this subchapter also describe the procedures, practices, and instructions, which are applicable to the public subject to certain laws governing bridges and causeways over the navigable waters of the United States.
[USCG-2008-0179, 73 FR 35012, June 19, 2008, as amended by USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 114.05 Definitions.
The following definitions apply to this subchapter:
Approved means approved by the Commandant unless otherwise stated.
Bridge means a structure erected across navigable waters of the United States, and includes causeways, approaches, fenders, and other appurtenances thereto.
Coast Guard District Commander or District Commander means an officer of the Coast Guard designated as such by the Commandant to command all Coast Guard activities within his or her district. (See part 3 of this chapter for descriptions of Coast Guard Districts.)
Commandant means Commandant, U.S. Coast Guard, Department of Homeland Security, Washington, DC 20593.
Deputy Commandant for Operations means the officer of the Coast Guard designated by the Commandant as the staff officer in charge of “Operations” (DCO), U.S. Coast Guard Headquarters.
District Office or Coast Guard District Office means the Office of the Commander of a Coast Guard District.
Headquarters or Coast Guard Headquarters means the Office of the Commandant, U.S. Coast Guard, Department of Homeland Security, Washington, DC 20593-7000.
Permit means the license permitting construction of bridges and approaches thereto in or over navigable waters of the United States, issued under the rules and regulations in this subchapter.
Secretary means the Secretary of Homeland Security or any person to whom he or she has delegated his or her authority in the matter concerned.
United States Coast Guard or Coast Guard means the organization or agency established by the Act of January 28, 1915, as amended (14 U.S.C. 101).
[USCG-2012-0306, 77 FR 37313, June 21, 2012, as amended by USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
§ 114.10 General policies on issuance of permits and drawbridge operation regulations.
The several bridge laws referenced in the Authority for part 114, are intended to prevent any interference with navigable waters of the United States whether by bridges, dams, dikes or other obstructions to navigation except by express permission of the United States. The decision as to whether a bridge permit or a drawbridge operation regulation will be issued or promulgated must rest primarily upon the effect of the proposed action on navigation to assure that the action provides for the reasonable needs of navigation after full consideration of the effect of the proposed action on the human environment. The Coast Guard is not responsible for any other permits that the applicant may need from other federal, state, or local agencies and issuance of a bridge permit does not affect flood control projects or other governmental programs.
[CGD 82-006, 47 FR 36640, Aug. 23, 1982, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 114.20 Departure from permit plans.
(a) If the final inspection shows a minor departure from the authorized plans which does not materially affect navigation, the permittee will be required to furnish as-built plans showing the work as actually constructed but no further action will be taken by the Coast Guard.
(b) It is not the practice of the Coast Guard to issue letters certifying that completed work conforms to that which was authorized. That question is a matter of fact to be determined in case of controversy by the usual rules of court procedure.
[CGFR 67-46, 32 FR 17769, Dec. 12, 1967, as amended by USCG-2012-0306, 77 FR 37314, June 21, 2012]
§ 114.25 Work constructed without prior authority.
The Commandant or District Commander will approve plans and issue permits authorizing bridges across navigable waters, in cases where the application therefor is submitted after the commencement or completion of the bridges subject to the following rules: Approval will be limited to those cases where the necessary primary authority, State or Federal as the case may be, validly existed, when the work was innocently constructed, and where the work will not unreasonably interfere with navigation. Upon issuance of the permit, applicant will be informed that the law contemplates prior approval and that in the future plans must be submitted in ample time for their consideration by the Commandant or District Commander before construction is begun.
(5 U.S.C. 559; 14 U.S.C. 503; 33 U.S.C. 401, 491, 499, and 525; and 49 CFR 1.46(c) and (q))
[CGD 80-099, 46 FR 38354, July 27, 1981, as amended by USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
§ 114.30 Revocation.
Permits may be revoked by the issuing official for failure on the part of the permittee to comply with any of the conditions therein, or where the structures or other work constitute an unreasonable obstruction to navigation or to operations of the United States in the interest of navigation or flood control.
[CGD 82-006, 47 FR 36640, Aug. 23, 1982]
§ 114.40 Violations of law.
The Coast Guard has the authority and responsibility for enforcement of the applicable provisions of law for the protection and preservation of navigable waters. It is the policy of the Coast Guard to secure compliance with these provisions of law short of legal proceedings. As a general principle, no action is taken when the violation is minor, unintentional, or accidental and the party responsible corrects the violation. It is the policy of the Coast Guard to implement civil or criminal proceedings in all other circumstances. These proceedings are in subpart 1.07 of Part 1 of this chapter.
(Secs. 107, 108, Pub. L. 97-322, 96 Stat. 1582; (33 U.S.C. 495, 499, 502, 525, 533); 49 CFR 1.46(c))
[CGD 82-102, 47 FR 54299, Dec. 2, 1982, as amended by USCG-2001-9286, 66 FR 33641, June 25, 2001]
§ 114.45 Applications, extensions of time.
Extensions of time to commence or complete construction of a bridge or remove a bridge that has been replaced as an element of a permitted bridge project must be submitted to, and received by the District Commander at least 30 days before the existing permit expires to allow the permit to remain in effect until the final agency action is taken.
(33 U.S.C. 401, 491, 525, 535; 49 CFR 1.46(c) (8), (9), (10), (q))
[CGD 76-144, 42 FR 28882, June 6, 1977]
§ 114.50 Right of appeal.
A District Commander's decision to deny a bridge permit application or an application for drawbridge operation regulations may be appealed to the Commandant, U.S. Coast Guard. The appeal must be submitted in writing to the Commandant (CG-BRG), Attn: Office of Bridge Programs, U.S. Coast Guard Stop 7418, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7418 or HQS-SMB-CG-BRG@uscg.mil , within 60 days of the District Commander's decision. The Commandant will take action on the appeal within 90 days of its receipt.
(5 U.S.C. 559; 14 U.S.C. 503; 33 U.S.C. 401, 491, 499, and 525; and 49 CFR 1.46(c) and (q))
[CGD 80-099, 46 FR 38354, July 27, 1981]
Editorial Note:For Federal Register citations affecting § 114.50, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
PART 115 BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES
Authority: Mar. 3, 1899, Ch. 425, sec. 9, 30 Stat. 1151 (33 U.S.C. 401); Mar. 23, 1906, Ch. 1130, sec. 1, 34 Stat. 84 (33 U.S.C. 491); sec. 5, 28 Stat. 362, as amended (33 U.S.C. 499); sec. 11, 54 Stat. 501, as amended (33 U.S.C. 521); Aug 2, 1946, Ch. 753, title V, sec. 502, 60 Stat. 847, as amended (33 U.S.C. 525); 86 Stat. 732 (33 U.S.C. 535); 14 U.S.C. 503.
Source: CGFR 67-46, 32 FR 17771, Dec. 12, 1967, unless otherwise noted.
§ 115.01 Purpose.
This part states the requirements for applying for a permit to construct or modify bridges crossing the navigable waters of the United States. It also sets forth the procedures by which the application is processed by the Coast Guard.
[CGD 82-006, 47 FR 36641, Aug. 23, 1982, as amended by USCG-2012-0306, 77 FR 37314, June 21, 2012]
§ 115.05 Necessary primary authority.
For bridges constructed by State or municipal agencies, the primary authority will be presumed without proof. If the law of the State requires a license for or approval of the bridge from a constituted State agency, a copy of such license or approval will be required and may be accepted as evidence of the primary authority. If there is no State regulation of bridges in navigable waters, the necessary primary authority may be that granted in the charter of a corporation, or the authority inherent in the ownership of the land on which the structure is placed. The applicant will in such cases be required to furnish an excerpt from the charter, or a statement of ownership. Special care will be taken that Federal approval is not granted when there is doubt of the right of the applicant to construct and utilize the bridge.
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967, as amended by USCG-2011-0257, 76 FR 31836, June 2, 2011: USCG-2012-0306, 77 FR 37314, June 21, 2012; USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 115.10 Sufficiency of State authority for bridges.
An opinion of the attorney general of the State as to the sufficiency of State authority for the construction of a bridge is acceptable to the Coast Guard in doubtful cases.
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967. Redesignated by USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 115.15 Limiting date in permits.
(a) Specific time limitations are inserted in all permits for the commencement of construction and completion thereof. Normally three years for start of construction and two additional years for completion may be allowed.
(b) Specific time limitations are inserted in all permits for the removal of bridges being replaced in whole or in part by the newly permitted bridges where removal thereof is required as a condition of the permit. Normally 90 days for removal after completion of the new bridge or opening to land transportation, whichever occurs first, may be allowed.
[CGD 75-046, 40 FR 24898, June 11, 1975, as amended by CGD 80-099, 46 FR 38354, July 27, 1981. Redesignated by USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 115.20 Permit bonds.
When compensatory works or the removal of temporary structures should be required of the permittee, or in other unusual cases when there is reason to anticipate that the permittee may fail to carry out parts of the work that are against his interest, an additional condition will be included in the permit requiring the permittee to furnish a bond insuring compliance with the permit requirements.
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967. Redesignated by USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 115.30 Transfer of permits.
Permits express merely the assent of the Federal Government so far as concerns the public rights of navigation. Although issued to a specific party, the assent is not limited to execution of the work by that party and may be availed of by the assignees or purchasers of the property affected, provided the terms of the instrument are strictly complied with.
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967. Redesignated by USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 115.40 Bridge repairs.
Repairs to a bridge which do not alter the clearances, type of structure, or any integral part of the substructure or superstructure or navigation conditions, but which consist only in the replacement of worn or obsolete parts, may, if the bridge is a legally approved structure, be made as routine maintenance without a formal permit action from the U.S. Coast Guard.
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967, as amended by USCG-2012-0306, 77 FR 37314, June 21, 2012]
§ 115.50 Application for bridge permits.
(a) Application. An application for authorization to construct a bridge across navigable waters of the United States must include the name, address, telephone number, and email address of the applicant; the waterway and location of the bridge; a citation to the applicable act of Congress; when appropriate, a citation to the State legislation authorizing the bridge; a map of the location and plans of the bridge showing the features which affect navigation; papers to establish the identity of the applicant. Additional guidance on completing the application can be found in the Bridge Permit Application Guide, COMDTPUB16591.series.
(b) Prior authority necessary. Except as provided under paragraph (c) of this section, a bridge cannot lawfully be constructed across any navigable waterway of the United States until the location and plans have been approved by the Coast Guard.
(c) Prior authority not necessary. Coast Guard approval of the location and plans for construction or modification of a bridge or causeway is not required for any bridge or causeway over waters which are not subject to the ebb and flow of the tide and which are not used and are not susceptible to use in their natural condition or by reasonable improvement as a means to transport interstate or foreign commerce, whether or not such waters were used or were susceptible to use, at some previous time, to transport commerce (historic use). This provision does not apply to bridges which connect the United States with any foreign country.
(d) Signature. In case of signature by an agent or by an official of a corporation, a duly authenticated copy of the authority for the action must accompany the application.
(e) Identification. If the applicant is a corporation, it must furnish certified copies of the following papers, all properly authenticated: The charter or articles of incorporation; the minutes of organization; an excerpt from the minutes showing the names of the present officers of the corporation.
(1) Where State laws vest in State or county officers, such as boards of supervisors and county courts, the power to authorize the construction of bridges, they must furnish with their application certified excerpts from their proceedings showing their action authorizing the proposed structure.
(f) Plans. One reproducible set of plans must be submitted with the application, on which the location of the work and the essential features covered by the application will be identified. Each drawing must have a title block located in the lower right-hand corner identifying the applicant/agent and bridge owner; the waterway; the milepoint on the waterway of the bridge location; the city, county, and state of the bridge location; the name of the bridge; the date of the plans; the sheet number; and the total number of sheets in the set.
(g) Size of sheets. The drawings will be on letter size sheets. As few sheets will be used as necessary to show clearly what is proposed.
(h) Special instructions. (1) Vertical and horizontal distances will be shown using bar scales. The north and south line will be indicated by a meridian arrow. Soundings and elevations will be shown in feet and refer to the established Government datum plane at the locality.
(2) The direction of the current or, for tidal waters, the direction of the ebb and flow, will be indicated by arrow(s), and will be shown close to the proposed location of the bridge, and at both ends of the waterway shown on the map of location.
(3) The plans will show in figures the least clear height of the lowest part of the superstructure over navigation openings, with reference to the planes of mean high water and mean low water if the bridge is to cross tidal water. If the waters are nontidal, the least clear height will be shown with reference to the planes of extreme high water and mean low water. If records of river heights are available, the 2 percent flowline (the plane above which flood waters have not remained more than 2 percent of the time) will be indicated. Reference will also be made to other datum planes if appropriate for the waterway in question.
(4) If harbor lines have been established at the site of the bridge, their position will be shown on the plans.
(i) Structural details. Only those should be shown which are needed to illustrate the effect of the proposed structure on navigation. If the bridge is to be equipped with a draw, the latter will be shown in two positions: Closed and open. In those cases, the vertical and horizontal clearances shall be indicated in both the closed and open positions.
(j) To whom application should be presented. The application and the papers and plans accompanying it should be submitted to the District Commander having jurisdiction over the area in which the bridge site is located.
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967, as amended by CGD 75-046, 40 FR 24898, June 11, 1975; CGD 80-099, 46 FR 38354, July 27, 1981; CGD 82-102, 48 FR 54299, Dec. 2, 1982; USCG-2011-0257, 76 FR 31836, June 2, 2011: USCG-2012-0306, 77 FR 37314, June 21, 2012; USCG-2016-0498, 82 FR 35081, July 28, 2017; USCG-2024-1103, 90 FR 52877, Nov. 24, 2025]
§ 115.60 Procedures for handling applications for bridge permits.
The following procedures will be observed in the handling of applications for permits to construct, modify, or replace bridges over navigable waters.
(a) District Commander's review of application and plans. When an application is received, the District Commander verifies the authority for construction of the bridge, reviews the application and plans for sufficiency, ascertains the views of local authorities and other interested parties, and ensures that the application complies with relevant environmental laws, regulations, and orders. If the application contains any defects that would prevent issuance of a permit (as for example, if the proposed bridge provided insufficient clearance), the applicant is notified that the permit cannot be granted and given reasons for this determination. The applicant may then request that the application be considered by the Commandant. If the applicant makes such a request, or if the application is not found defective, the District Commander notifies the public that it has been received and continues its processing.
(b) Public meeting. (1) Public meetings will be held when there are substantial issues concerning the effect that the proposed bridge will have on the reasonable needs of navigation.
(2) Notice of the public meeting will be published in the Federal Register. Notice of the meeting is also emailed or mailed to State, county, municipal authorities, and all other known interested parties. It may also be posted in public places in the vicinity of the project or published in local publications and through local media channels, or both.
(3) Meetings are public and conducted in an informal manner. A designated Coast Guard official presides. The submission of written statements is invited and encouraged. Anyone desiring to do so may speak. Statements, written or oral, are not under oath, and cross-examination is not permitted. No fixed order has been established for the presentation of evidence or argument although proponents are generally heard first, followed by opponents with full opportunity afforded for rebuttals.
(c) Report and recommendations. After the close of the comment period and any public meeting, a detailed statement of findings, conclusions, and recommendations based on all available information (including Coast Guard records and experience) is prepared. The following factors may be discussed in this report:
(1) Comparison of proposed bridge with existing bridges over the waterway; attitude of local authorities; summary of objections raised by the public, and District Commander's comments or responses; probable effect on navigation, present and prospective.
(2) Description of the navigation on the waterway past the site of the proposed bridge, the number and type of vessels, the number of vessel trips, and the principal method of handling traffic, whether in single vessels or in tows.
(3) Whether the District Commander approves, or recommends approval of the plans. If they are found objectionable, the reasons for this finding will be stated. If there are objectionable features in the plans which may be corrected, the applicant is given an opportunity to revise them. If approval is given or recommended, all conditions to which the permit should be subject will be stated.
(d) Action on permit application. (1) The District Commander may issue the permit if authorized under § 1.01-60(b) of this chapter; otherwise, a report with the application shall be submitted to the Commandant for final action.
(2) When an application is approved, the issuing official signs the permit and transmits it to the applicant.
(3) When an application is not approved, the applicant is notified and provided with reasons for the disapproval and suggestions for modifications that would justify reconsideration, if appropriate.
(4) If an application is disapproved by the District Commander, the applicant may appeal this decision to the Commandant under § 114.50 of this chapter. The Commandant's determination shall constitute final agency action.
(e) Permit amendments. Applications for amendments to permits will be processed in the same manner as permit applications. The District Commander may approve amendments to any permits which that official is authorized to issue under § 1.01-60(b) of this chapter. All other amendments must be approved by the Commandant.
(5 U.S.C. 559; 14 U.S.C. 503; 33 U.S.C. 401, 491, 499, and 525; and 49 CFR 1.46(c) and (q))
[CGD 80-099, 46 FR 38354, July 27, 1981; 46 FR 42268, Aug. 20, 1981, as amended by CGD 82-006, 47 FR 36641, Aug. 23, 1982; CGD 82-074, 47 FR 51865, Nov. 18, 1982; USCG-2008-0179, 73 FR 35012, June 19, 2008; USCG-2010-0351, 75 FR 49410, Aug. 13, 2010: USCG-2012-0306, 77 FR 37314, June 21, 2012; USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2020-0304, 85 FR 58278, Sept. 18, 2020; USCG-2022-0323, 88 FR 10029, Feb. 16, 2023; USCG-2024-1103, 90 FR 52877, Nov, 24, 2025]
§ 115.70 Advance approval of bridges.
(a) The General Bridge Act of 1946 requires the approval of the location and plans of bridges prior to start of construction (33 U.S.C. 525). The Commandant has given his advance approval to the location and plans of bridges to be constructed across reaches of waterways navigable in law, but not actually navigated other than by logs, log rafts, rowboats, canoes and small motorboats. In such cases the clearances provided for high water stages will be considered adequate to meet the reasonable needs of navigation. The Coast Guard recommends notice to the District Bridge Manager to ensure that the District has determined that advance approval provision is applicable to the waterway reach over which the bridge is to be constructed.
(b) The term “small motorboats” shall be interpreted in the light of the things and conditions with which it is associated. The term means rowboats, canoes and other similar craft with outboard motors. It does not include sailing or cabin cruiser craft.
(14 U.S.C. 503; 33 U.S.C. 401, 491, and 525; and 49 CFR 1.46(c))
[CGFR 67-46, 32 FR 17771, Dec. 12, 1967, as amended by CGD 81-076, 46 FR 54936, Nov. 5, 1981; USCG-1998-3799, 63 FR 35527, June 30, 1998; USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
PART 116 ALTERATION OF UNREASONABLY OBSTRUCTIVE BRIDGES
Authority: 33 U.S.C. 401, 521.
Source: CGD 91-063, 60 FR 20902, Apr. 28, 1995, unless otherwise noted.
Editorial Note: Nomenclature changes to part 116 appear by USCG-2008-0179, 73 FR 35012, June 19, 2008, and by USCG-2010-0351, 75 FR 49410, Aug. 13, 2010.
§ 116.01 General.
(a) All bridges are obstructions to navigation and are tolerated only as long as they serve the needs of land transportation while allowing for the reasonable needs of navigation.
(b) This part describes the general procedures by which the U.S. Coast Guard determines a bridge to be an unreasonable obstruction to navigation and issues an Order to Alter under the authority of the following statutes, as appropriate: Section 18 of the Rivers and Harbors Appropriations Act of 1899, 33 U.S.C. 502; Section 4 of the Bridge Act of 1906, 33 U.S.C. 494; or the Truman-Hobbs Act of 1940, as amended, 33 U.S.C. 511-524.
(c) A bridge constructed across a navigable water of the United States shall not unreasonably obstruct the free navigation of the water over which it was constructed, either due to insufficient height or width of the navigation span, or because of difficulty in passing through the draw opening. If any bridge unreasonably obstructs navigation, the Commandant, U.S. Coast Guard, will order the alteration of that bridge. Alterations may include structural changes, replacement, or removal of the bridge.
(d) Whenever the Coast Guard has good reason to believe that a bridge across any of the navigable waters of the United States is an unreasonable obstruction to navigation, the Coast Guard will give notice to the owner of the bridge and other interested parties, and hold a public meeting at which the interested parties will have a full opportunity to be heard and to provide information on the question of whether alterations to the bridge are necessary and, if so, the extent of alterations needed.
(e) If the Coast Guard determines that alterations to a bridge are necessary, the Commandant, U.S. Coast Guard, will issue to the bridge owner an Order to Alter containing details of the alterations necessary to render navigation through or under the bridge reasonably free, easy, and unobstructed.
(1) In the case of a railroad or publicly owned highway bridge, an Order to Alter is issued to the bridge owner under the provisions of the Truman-Hobbs Act (33 U.S.C. 511 et seq.). In ordering these alterations, the Coast Guard will give due regard to the necessities of free and unobstructed navigation and of rail and highway traffic. For alterations to bridges governed by the Truman-Hobbs Act, the Coast Guard must approve general plans, specifications, and contracts for the alteration project, as well as approving the apportionment of the total cost of the alterations between the United States and the bridge owner.
(2) For all other bridges, the Order to Alter will contain the required alterations for the bridge and will prescribe a reasonable time in which to accomplish the required alterations. The bridge owner is responsible for the entire cost of the required alterations.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by USCG-2010-0351, 75 FR 49410, Aug. 13, 2010]
§ 116.05 Complaints.
Any person, company, or other entity may submit to the District Commander of the Coast Guard district in which a bridge over a navigable water of the United States is located, a complaint that a bridge unreasonably obstructs navigation. The complaint must be in writing and include specific details to support the allegation.
§ 116.10 Preliminary review.
(a) Upon receipt of a written complaint, the District Commander will review the complaint to determine if, in the District Commander's opinion, the complaint is justified and whether a Preliminary Investigation is warranted.
(1) The District Commander's opinion as to whether or not the complaint warrants a Preliminary Investigation will be formed through informal discussions with the complainant, users of the affected waterway, the owner of the bridge, and other interested parties.
(2) In forming an opinion, the District Commander may also review the district files, records of accidents, and details of any additional written complaints associated with the bridge in question.
(b) In the absence of any written complaint, the District Commander may decide, based on a bridge's accident history or other criteria, to conduct a Preliminary Investigation.
(c) The District Commander will inform the complainant and the Chief, Office of Bridge Programs of the determination of any Preliminary Review. If the District Commander decides that the bridge in question is not an unreasonable obstruction to navigation, the complainant will be provided with a brief summary of the information on which the District Commander based the decision and will be informed of the appeal process described in § 116.55. There will be no further investigation, unless additional information warrants a continuance or reopening of the case.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33663, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 116.15 Preliminary investigation.
(a) During the Preliminary Investigation, the District Commander will prepare a written report containing all pertinent information and submit the report, together with a recommendation for or against the necessity of a Detailed Investigation, to the Chief, Office of Bridge Programs.
(b) The Preliminary Investigation Report will include a description of the nature and extent of the obstruction, the alterations to the bridge believed necessary to meet the reasonable needs of existing and future navigation, the type and volume of waterway traffic, and a calculation of the benefits to navigation which would result from the proposed bridge alterations.
(c) The Chief, Office of Bridge Programs will review the Preliminary Investigation Report and make a Preliminary Decision whether or not to undertake a Detailed Investigation and a Public Meeting.
(d) If after reviewing the Preliminary Investigation Report, the Chief, Office of Bridge Programs decides that further investigation is not warranted, the complainant will be notified of the decision. This notification will include a brief summary of information on which the decision was based and details of the appeal process described in § 116.55.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33663, June 28, 1996; USCG-2012-0306, 77 FR 37314, June 21, 2012; USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2014-0410, 79 FR 38433, July 7, 2014]
§ 116.20 Detailed investigation.
(a) When the Chief, Office of Bridge Programs determines that a Detailed Investigation should be conducted, the District Commander will initiate an investigation that addresses all of the pertinent data regarding the bridge, including information obtained at a public meeting held under § 116.25. As part of the investigation, the District Commander will develop a comprehensive report, termed the “Detailed Investigation Report”, which will discuss: the obstructive character of the bridge in question; the impact of that bridge upon navigation; navigational benefits derived; whether an alteration is needed to meet the needs of navigation; and, if alteration is recommended, what type.
(b) The District Commander will forward the completed Detailed Investigation Report to the Chief, Office of Bridge Programs for review together with a recommendation of whether the bridge should be declared an unreasonable obstruction to navigation and, if so, whether an Order to Alter should be issued.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33663, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 116.25 Public meetings.
(a) Any time the Chief, Office of Bridge Programs determines that a Detailed Investigation is warranted, or when Congress declares a bridge unreasonably obstructive, the District Commander will hold a public meeting near the location of the bridge to provide the bridge owner, waterway users, and other interested parties the opportunity to offer evidence and be heard, orally or in writing, as to whether any alterations are necessary to provide reasonably free, safe, and unobstructed passage for waterborne traffic. The District Commander will issue a public notice announcing the public meeting stating the time, date, and place of the meeting.
(b) When a bridge is statutorily determined to be an unreasonable obstruction, the scope of the meeting will be to determine what navigation clearances are needed.
(c) In all other cases, the scope of the meeting will be to address issues bearing on the question of whether the bridge is an unreasonable obstruction to navigation and, if so, what alterations are needed.
(d) The meeting will be recorded. Copies of the public meeting transcript will be available for purchase from the recording service.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33664, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 116.30 Chief, Office of Bridge Programs Review and Evaluation.
(a) Upon receiving a Detailed Investigation Report from a District Commander, the Chief, Office of Bridge Programs will review all the information and make a final determination of whether or not the bridge is an unreasonable obstruction to navigation and, if so, whether to issue an Order to Alter. This determination will be accompanied by a supporting written Decision Analysis which will include a Benefit/Cost Analysis, including calculation of a Benefit/Cost Ratio.
(b) The Benefit/Cost ratio is calculated by dividing the annualized navigation benefit of the proposed bridge alteration by the annualized government share of the cost of the alteration.
(c) Except for a bridge which is statutorily determined to be an unreasonable obstruction, an Order to Alter will not be issued under the Truman-Hobbs Act unless the ratio is at least 1:1.
(d) If a bridge is statutorily determined to unreasonably obstruct navigation, the Chief, Office of Bridge Programs will prepare a Decision Analysis to document and provide details of the required vertical and horizontal clearances and the reasons alterations are necessary.
(e) If the Chief, Office of Bridge Programs decides to recommend that the Commandant issue an Order to Alter, or a bridge is statutorily determined to unreasonably obstruct navigation, the Chief, Office of Bridge Programs will issue a letter to the bridge owner (“The 60-Day Letter”) at least 60 days before the Commandant issues an Order to Alter. This letter will contain the reasons an alteration is necessary, the proposed alteration, and, in the case of a Truman-Hobbs bridge, an estimate of the total project cost and the bridge owner's share.
(f) If the bridge owner does not agree with the terms proposed in the 60-Day Letter, the owner may request a reevaluation of the terms. The request for a reevaluation must be in writing, and identify the terms for which reevaluation is requested. The request may provide additional information not previously presented.
(g) Upon receipt of the bridge owner's response, the Chief, Office of Bridge Programs will reevaluate the situation based on the additional information submitted by the bridge owner. If after the Chief, Office of Bridge Programs reviews the determination, there is no change, the Commandant may issue an Order to Alter as set out in § 116.35. The Administrator, Office of Bridge Programs determination based on the reevaluation will constitute final agency action.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33664, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 116.35 Order to Alter.
(a) If the bridge owner agrees with the contents of the 60-Day Letter, if no reply is received by 60 days after the issuance of the letter, or if after reevaluation a bridge is determined to be an unreasonable obstruction to navigation, the Commandant will issue an Order to Alter.
(1) If a bridge is eligible for funding under the Truman-Hobbs Act, the Order to Alter will specify the navigational clearances to be accomplished in order to meet the reasonable needs of navigation.
(2) An Order to Alter for a bridge that is not eligible for Truman-Hobbs funding will specify the navigational clearances that are required to meet the reasonable needs of navigation and will prescribe a reasonable time in which to accomplish them.
(b) If appropriate, the Order to Alter will be accompanied by a letter of special conditions setting forth safeguards needed to protect the environment or to provide for any special needs of navigation.
(c) If a proposed alteration to a bridge has desirable, non-navigational benefits, the Chief, Office of Bridge Programs may require an equitable contribution from any interested person, firm, association, corporation, municipality, county, or state benefiting from the alteration as a prerequisite to the making of an Order to Alter for that alteration.
(d) Failure to comply with any Order to Alter issued under the provisions of this part will subject the owner or controller of the bridge to the penalties prescribed in 33 U.S.C. 495, 502, 519, or any other applicable provision.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33664, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 116.40 Plans and specifications under the Truman-Hobbs Act.
(a) After an Order to Alter has been issued to a bridge owner under the Truman-Hobbs Act, the Chief, Office of Bridge Programs will issue a letter to the bridge owner outlining the owner's responsibilities to submit plans and specifications to the Chief, Office of Bridge Programs for the alteration of the bridge. The plans and specifications, at a minimum, must provide for the clearances identified in the Order to Alter. The plans and specifications may also include any other additional alteration to the bridge that the owner considers desirable to meet the requirements of railroad or highway traffic. During the alteration process, balanced consideration shall be given to the needs of rail, highway, and marine traffic.
(b) The Chief, Office of Bridge Programs will approve or reject the plans and specifications submitted by the bridge owner, in whole or in part, and may require the submission of new or additional plans and specifications.
(c) When Chief, Office of Bridge Programs has approved the submitted plans and specifications, they are final and binding upon all parties, unless later changes are approved by the Chief, Office of Bridge Programs. Any changes to the approved plans will be coordinated with the District Commander.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33664, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 116.45 Submission of bids, approval of award, guaranty of cost, and partial payments for bridges eligible for funding under the Truman-Hobbs Act.
(a) Once the plans and specifications for a bridge eligible for funding under the Truman-Hobbs Act have been approved, the bridge owner must take bids for the alteration of the bridge consistent with the approved plans and specifications. Those bids must then be submitted to the Chief, Office of Bridge Programs for approval.
(b) After the bridge owner submits the guaranty of cost required by 33 U.S.C. 515, the Chief, Office of Bridge Programs authorizes the owner to award the contract.
(c) Partial payments of the government's costs are authorized as the work progresses to the extent that funds have been appropriated.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33664, June 28, 1996; USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2014-0410, 79 FR 38433, July 7, 2014]
§ 116.50 Apportionment of costs under the Truman-Hobbs Act.
(a) In determining the apportionment of costs, the bridge owner must bear such part of the cost attributable to the direct and special benefits which will accrue to the bridge owner as a result of alteration to the bridge, including expected savings in repairs and maintenance, expected increased carrying capacity, costs attributable to the requirements of highway and railroad traffic, and actual capital costs of the used service life. The United States will bear the balance of the costs, including that part attributable to the necessities of navigation.
(b) “Direct and special benefits” ordinarily will include items desired by the owner but which have no counterpart or are of higher quality than similar items in the bridge prior to alteration. Examples include improved signal and fender systems, pro rata share of dismantling costs, and improvements included, but not required, in the interests of navigation.
(c) During the development of the Apportionment of Costs, the bridge owner will be provided with an opportunity to be heard. Proportionate shares of cost to be borne by the United States and the bridge owner are developed in substantially the following form:
Total cost of project ________ $________ Less salvage ____ $____ Less contribution by third party ____ $____ Cost of alteration to be apportioned ____ $____ Share to be borne by the bridge owner: Direct and Special Benefits: a. Removing old bridge ____ $____ b. Fixed charges ____ $____ c. Betterments ____ $____ Expected savings in repair or maintenance costs: a. Repair ____ $____ b. Maintenance ____ $____ Costs attributable to requirements of railroad and/or highway traffic ____ $____ Expenditure for increased carrying capacity ____ $____ Expired service life of old bridge ____ $____ Subtotal ____ $____ Share to be borne by the bridge owner ____ $____ Contingencies ____ $____ Total ____ $____ Share to be borne by the United States ____ $____ Contingencies ____ $____ Total ____ $____
(d) The Order of Apportionment of Costs will include the guaranty of costs.
§ 116.55 Appeals.
(a) Except for the decision to issue an Order to Alter, if a complainant disagrees with a decision regarding obstruction or eligibility made by a District Commander, or the Chief, Office of Bridge Programs, the complainant may appeal that decision to the Deputy Commandant for Operations.
(b) The appeal must be submitted in writing to the Commandant (CG-DCO-D), Attn: Deputy for Operations Policy and Capabilities, U.S. Coast Guard Stop 7318, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7318, or USCGDCO@uscg.mil, within 60 days after the District Commander's or the Chief, Office of Bridge Programs decision. The Deputy Commandant for Operations will make a decision on the appeal within 90 days after receipt of the appeal. The Deputy Commandant of Operations' decision of this appeal shall constitute final agency action.
(c) Any Order of Apportionment made or issued under section 6 of the Truman-Hobbs Act, 33 U.S.C. 516, may be reviewed by the Court of Appeals for any judicial circuit in which the bridge in question is wholly or partly located, if a petition for review is filed within 90 days after the date of issuance of the order. The review is described in section 10 of the Truman-Hobbs Act, 33 U.S.C. 520. The review proceedings do not operate as a stay of any order issued under the Truman-Hobbs Act, other than an order of apportionment, nor relieve any bridge owner of any liability or penalty under other provisions of that act.
[CGD 91-063, 60 FR 20902, Apr. 28, 1995, as amended by CGD 96-026, 61 FR 33663, June 28, 1996; CGD 97-023, 62 FR 33363, June 19, 1997; USCG-2008-0179, 73 FR 35013, June 19, 2008; USCG-2010-0351, 75 FR 36283, June 25, 2010; USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2014-0410, 79 FR 38433, July 7, 2014; USCG-2024-1103, 90 FR 52877, Nov. 24, 2025]
PART 117 DRAWBRIDGE OPERATION REGULATIONS
Authority: 33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.
Editorial Note: Nomenclature changes to part 117 appear by USCG-1998-3799, 63 FR 35529, June 30, 1998, and by USCG-2025-0186, 90 FR 12238, Mar. 17, 2025.
Subpart A General Requirements
§ 117.1 Purpose.
(a) This part prescribes the general and special drawbridge operating regulations that apply to the drawbridges across the navigable waters of the United States and its territories. The authority to regulate drawbridges across the navigable waters of the United States is vested in the Secretary of Homeland Security.
(b) Subpart A contains the general operation requirements that apply to all drawbridges.
(c) Subpart B contains specific requirements for operation of individual drawbridges. These requirements are in addition to or vary from the general requirements in Subpart A. Specific sections in subpart B that vary from a general requirement in Subpart A supersede the general requirement. All other general requirements in Subpart A, that are not at variance, apply to the drawbridges and removable span bridges listed in Subpart B.
[USCG-2001-10881, 71 FR 70307, Dec. 4, 2006]
§ 117.4 Definitions.
The following definitions apply to this part:
Appurtenance means an attachment or accessory extending beyond the hull or superstructure that is not an integral part of the vessel and is not needed for a vessel's piloting, propelling, controlling, or collision avoidance capabilities.
Automated drawbridge means a drawbridge that is operated by an automated mechanism, not a drawtender. An automated drawbridge is normally kept in the open to navigation position and closes when the mechanism is activated.
Deviation means a District Commander's action authorizing a drawbridge owner to temporarily not comply with the drawbridge opening requirements in this part.
Drawbridge means a bridge with an operational span that is intended to be opened for the passage of waterway traffic.
Drawspan means the operational span of a drawbridge.
Lowerable means a non-structural vessel appurtenance that is or can be made flexible, hinged, collapsible, or telescopic so that it can be mechanically or manually lowered.
Nonstructural means that the item is not rigidly fixed to the vessel and can be relocated or altered.
Not essential to navigation means that a nonstructural vessel appurtenance, when in the lowered position, would not adversely affect the vessel's piloting, propulsion, control, or collision-avoidance capabilities.
Public vessel means a vessel that is owned and operated by the United States Government and is not engaged in commercial service, as defined in 46 U.S.C. 2101.
Remotely operated drawbridge means a drawbridge that is operated by remote control from a location away from the drawbridge.
Removable span bridge means a bridge that requires the complete removal of a span by means other than machinery installed on the bridge to open the bridge to navigation.
Untended means that there is no drawtender at the drawbridge.
[USCG-2001-10881, 71 FR 70307, Dec. 4, 2006]
§ 117.5 When the drawbridge must open.
Except as otherwise authorized or required by this part, drawbridges must open promptly and fully for the passage of vessels when a request or signal to open is given in accordance with this subpart.
[USCG-2001-10881, 71 FR 70308, Dec. 4, 2006]
§ 117.7 General requirements of drawbridge owners.
Except for drawbridges that have been authorized, before January 3, 2007, to remain closed to navigation or as otherwise specified in subpart B, drawbridge owners must:
(a) Provide the necessary drawtender(s) for the safe and prompt opening of the drawbridge.
(b) Maintain the working machinery of the drawbridge in good operating condition.
(c) Cycle the drawspan(s) periodically to ensure operation of the drawbridge.
(d) Ensure that the drawbridge operates in accordance with the requirements of this part.
(e) Any drawbridge allowed to remain closed to navigation prior to January 3, 2007, when necessary, must be returned to operable condition within the designated time set forth by the District Commander and will become subject to the requirements of this part.
[USCG-2001-10881, 71 FR 70308, Dec. 4, 2006]
§ 117.8 Permanent changes to drawbridge operation.
(a) Anyone may submit a written request to the District Commander for a permanent change to a drawbridge operating requirement. The request must include documentation supporting or justifying the requested change.
(b) If after evaluating the request, the District Commander determines that the requested change is not needed, he or she will respond to the request in writing and provide the reasons for denial of the requested change.
(c) If the District Commander decides that a change may be needed, he or she will begin a rulemaking to implement the change.
[USCG-2001-10881, 71 FR 70308, Dec. 4, 2006]
§ 117.9 Delaying opening of a draw.
No person shall unreasonably delay the opening of a draw after the signals required by § 117.15 have been given.
Note:
Trains are usually controlled by the block method. That is, the track is divided into blocks or segments of a mile or more in length. When a train is in a block with a drawbridge, the draw may not be able to open until the train has passed out of the block and the yardmaster or other manager has “unlocked” the drawbridge controls. The maximum time permitted for delay is defined in Subpart B for each affected bridge. Land and water traffic should pass over or through the draw as soon as possible in order to prevent unnecessary delays in the opening and closure of the draw.
§ 117.11 Unnecessary opening of the draw.
No vessel owner or operator shall—
(a) Signal a drawbridge to open if the vertical clearance is sufficient to allow the vessel, after all lowerable nonstructural vessel appurtenances that are not essential to navigation have been lowered, to safely pass under the drawbridge in the closed position; or
(b) Signal a drawbridge to open for any purpose other than to pass through the drawbridge opening.
[CGD 91-059, 59 FR 16563, Apr. 7, 1994]
§ 117.15 Signals.
(a) General. (1) The operator of each vessel requesting a drawbridge to open shall signal the drawtender and the drawtender shall acknowledge that signal. The signal shall be repeated until acknowledged in some manner by the drawtender before proceeding.
(2) The signals used to request the opening of the draw and to acknowledge that request shall be sound signals, visual signals, or radiotelephone communications described in this subpart.
(3) Any of the means of signaling described in this subpart sufficient to alert the party being signaled may be used.
(b) Sound signals. (1) Sound signals shall be made by whistle, horn, megaphone, hailer, or other device capable of producing the described signals loud enough to be heard by the drawtender.
(2) As used in this section, “prolonged blast” means a blast of four to six seconds duration and “short blast” means a blast of approximately one second duration.
(3) The sound signal to request the opening of a draw is one prolonged blast followed by one short blast sounded not more than three seconds after the prolonged blast. For vessels required to be passed through a draw during a scheduled closure period, the sound signal to request the opening of the draw during that period is five short blasts sounded in rapid succession.
(4) When the draw can be opened immediately, the sound signal to acknowledge a request to open the draw is one prolonged blast followed by one short blast sounded not more than 30 seconds after the requesting signal.
(5) When the draw cannot be opened immediately, or is open and shall be closed promptly, the sound signal to acknowledge a request to open the draw is five short blasts sounded in rapid succession not more than 30 seconds after the vessel's opening signal. The signal shall be repeated until acknowledged in some manner by the requesting vessel.
(c) Visual signals. (1) The visual signal to request the opening of a draw is—
(i) A white flag raised and lowered vertically; or
(ii) A white, amber, or green light raised and lowered vertically.
(2) When the draw can be opened immediately, the visual signal to acknowledge a request to open the draw, given not more than 30 seconds after the vessel's opening signal, is—
(i) A white flag raised and lowered vertically;
(ii) A white, amber, or green light raised and lowered vertically; or
(iii) A fixed or flashing white, amber, or green light or lights.
(3) When the draw cannot be opened immediately, or is open and must be closed promptly, the visual signal to acknowledge a request to open the draw is—
(i) A red flag or red light swung back and forth horizontally in full sight of the vessel given not more than 30 seconds after the vessel's opening signal; or
(ii) A fixed or flashing red light or lights given not more than 30 seconds after the vessel's opening signal.
(4) The acknowledging signal when the draw cannot open immediately or is open and must be closed promptly shall be repeated until acknowledged in some manner by the requesting vessel.
(d) Radio telephone communications. (1) Radiotelephones may be used to communicate the same information provided by sound and visual signals.
(2) The vessel and the drawtender shall monitor the frequency used until the vessel has cleared the draw.
(3) When radiotelephone contact cannot be initiated or maintained, sound or visual signals under this section shall be used.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 82-025, 50 FR 11366, Mar. 21, 1985; CGD 84-022, 51 FR 16308, May 2, 1986; CGD 96-026, 61 FR 33664, June 28, 1996; USCG-2001-10881, 71 FR 70308, Dec. 4, 2006]
§ 117.17 Signalling for contiguous drawbridges.
When a vessel must past two or more drawbridges close together, the opening signal is given for the first bridge. After acknowledgment from the first bridge that it will promptly open, the opening signal is given for the second bridge, and so on until all bridges that the vessel must pass have been given the opening signal and have acknowledged that they will open promptly.
§ 117.19 Signalling when two or more vessels are approaching a drawbridge.
When two or more vessels are approaching the same drawbridge at the same time, or nearly the same, time, whether from the same or opposite directions, each vessel shall signal independently for the opening of the draw and the drawtender shall reply in turn to the signal of each vessel. The drawtender need not reply to signals by vessels accumulated at the bridge for passage during a scheduled open period.
§ 117.21 Signalling for an opened drawbridge.
When a vessel approaches a drawbridge with the draw in the open position, the vessel shall give the opening signal. If no acknowledgment is received within 30 seconds, the vessel may proceed, with caution, through the open draw.
§ 117.23 Installation of radiotelephones.
(a) When the District Commander deems it necessary for reasons of safety of navigation, the District Commander may require the installation and operation or a radiotelephone on or near a drawbridge.
(b) The District Commander gives written notice of the proposed requirement to the bridge owner.
(c) All comments the owner wishes to submit shall be submitted to the District Commander within 30 days of receipt of the notice under paragraph (b) of this section.
(d) If, upon consideration of the comments received, the District Commander determines that a radiotelephone is necessary, the District Commander notifies the bridge owner that a radiotelephone shall be installed and gives a reasonable time, not to exceed six months, to install the radiotelephone and commence operation.
§ 117.24 Radiotelephone installation identification.
(a) The Coast Guard authorizes, and the District Commander may require the installation of a sign on drawbridges, on the upstream and downstream sides, indicating that the bridge is equipped with and operates a VHF radiotelephone in accordance with § 117.23.
(b) The sign shall give notice of the radiotelephone and its calling and working channels—
(1) In plain language; or
(2) By a sign consisting of the outline of a telephone handset with the long axis placed horizontally and a vertical three-legged lightning slash superimposed over the handset. The slash shall be as long vertically as the handset is wide horizontally and normally not less than 27 inches and no more than 36 inches long. The preferred calling channel should be shown in the lower left quadrant and the preferred working channel should be shown in the lower right quadrant.
Note:
It is recommended that the radiotelephone sign be similar in design to the Service Signs established by the Federal Highway Administration (FHWA) in U.S. Road Symbol Signs using Reflective Blue and Reflective White colors. Color and design information is available from the District Commander of the Coast Guard District in which the bridge is located.
[CGD 84-022, 51 FR 16308, May 2, 1986]
§ 117.31 Drawbridge operations for emergency vehicles and emergency vessels.
(a) Upon receiving notification that an emergency vehicle is responding to an emergency situation, a drawtender must make all reasonable efforts to have the drawspan closed at the time the emergency vehicle arrives.
(b) When a drawtender receives notice, or a proper signal as provided in § 117.15 of this part, the drawtender shall take all reasonable measures to have the draw opened, regardless of the operating schedule of the draw, for passage of the following, provided this opening does not conflict with local emergency management procedures which have been approved by the cognizant Coast Guard Captain of the Port:
(1) Federal, State, and local government vessels used for public safety;
(2) Vessels in distress where a delay would endanger life or property;
(3) Commercial vessels engaged in rescue or emergency salvage operations; and
(4) Vessels seeking shelter from severe weather.
[CGD 91-016, 58 FR 20, Jan. 4, 1993, as amended at 71 FR 70308, Dec. 4, 2006]
§ 117.33 Closure of draw for natural disasters or civil disorders.
Drawbridges need not open for the passage of vessels during periods of natural disasters or civil disorders declared by the appropriate authorities unless otherwise provided for in Subpart B or directed to do so by the District Commander.
§ 117.35 Temporary change to a drawbridge operating schedule.
(a) For any temporary change to the operating schedule of a drawbridge, lasting less than or equal to 180 days, the District Commander may issue a deviation approval letter to the bridge owner and publish a “Notice of temporary deviation from regulations” in the Federal Register.
(b) If the time period for a temporary change to the operating schedule of a drawbridge will be greater then 180 days, the District Commander will follow appropriate rulemaking procedures and publish a temporary rule in the Federal Register prior to the start of the action.
(c) Request for change. (1) To temporarily change the drawbridge-operating requirements the bridge owner must submit a written request to the District Commander for approval of the change.
(2) The request must describe the reason for the deviation and the dates and times scheduled for the start and end of the change.
(3) Requests should be submitted as early as possible, preferably 90 days before the start of the action. District Commanders have discretion to accept requests submitted less than 90 days before a needed change if those requests can be processed before the date of the needed change.
(d) Determination. The District Commander's determination to allow the schedule change is normally forwarded to the bridge owner within ten working days after receipt of the request. If the request is denied, the reasons for the denial will be set out in the District Commander's decision letter.
(e) The drawbridge must return to its regular operating schedule immediately at the end of the designated time period.
(f) If the authorized deviation period for an event is broken into separate time periods on the same day or on consecutive days, the drawbridge must provide openings for navigation between authorized schedule changes.
(g) The District Commander will also announce the change to the operating schedule in the Local Notice to Mariners and other appropriate local media.
[USCG-2001-10881, 71 FR 70308, Dec. 4, 2006, as amended by USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2014-0410, 79 FR 38433, July 7, 2014]
§ 117.36 Closure of drawbridge for emergency repair.
(a) When a drawbridge unexpectedly becomes inoperable, or should be immediately rendered inoperable because of mechanical failure or structural defect, the drawbridge owner must notify the District Commander of the closure without delay and give the reason for the emergency closure of the drawbridge and an estimated time when the drawbridge will be returned to operating condition.
(b) The District Commander will notify mariners about the drawbridge status through Broadcast Notices to Mariners, Local Notice to Mariners and any other appropriate local media.
(c) Repair work under this section must be performed with all due speed in order to return the drawbridge to operation as soon as possible.
[USCG-2001-10881, 71 FR 70308, Dec. 4, 2006]
§ 117.39 Authorized closure of drawbridge due to infrequent requests for openings.
(a) When there have been no requests for drawbridge openings for at least two years, a bridge owner may request in writing that the District Commander authorize the drawbridge to remain closed to navigation and to be untended.
(b) The District Commander may:
(1) Authorize the closure of the drawbridge;
(2) Set out any conditions in addition to the requirement in paragraph (d): and
(3) Revoke an authorization and order the drawbridge returned to operation when necessary.
(c) All drawbridges authorized to remain closed to navigation, under this section, must be maintained in operable condition.
(d) Authorization under this section does not:
(1) Authorize physical changes to the drawbridge structure, or
(2) Authorize removal of the operating machinery.
(e) Drawbridges authorized under this section to remain closed to navigation and to be untended are identified in subpart B of this part.
[USCG-2001-10881, 71 FR 70308, Dec. 4, 2006]
§ 117.40 Advance notice for drawbridge opening.
(a) Upon written request by the owner of a drawbridge, the District Commander may authorize a drawbridge to operate under an advance notice for opening. The drawbridge tender, after receiving the advance notice, must open the drawbridge at the requested time and allow for a reasonable delay in arrival of the vessel giving the advance notice.
(b) If the request is approved, a description of the advanced notice for the drawbridge will be added to subpart B of this part.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.41 Maintaining drawbridges in the fully open position.
(a) Drawbridges permanently maintained in the fully open to navigation position may discontinue drawtender service as long as the drawbridge remains fully open to navigation. The drawbridge must remain in the fully open position until drawtender service is restored.
(b) If a drawbridge is normally maintained in the fully open to navigation position, but closes to navigation for the passage of pedestrian, vehicular, rail, or other traffic, the drawbridge must be tended unless:
(1) Special operating requirements are established in subpart B of this part for that drawbridge; or
(2) The drawbridge is remotely operated or automated.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.42 Remotely operated and automated drawbridges.
(a) Upon written request by the owner of a drawbridge, the District Commander may authorize a drawbridge to operate under an automated system or from a remote location.
(b) If the request is approved, a description of the full operation of the remotely operated or automated drawbridge will be added to subpart B of this part.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.47 Clearance gauges.
(a) Clearance gauges are required for drawbridges across navigable waters of the United States discharging into the Atlantic Ocean south of Delaware Bay (including the Lewes and Rehoboth Canal, DE) or into the Gulf of America (including coastal waterways contiguous thereto and tributaries to such waterways and the Lower Atchafalaya River, LA), except the Mississippi River and its tributaries and outlets,
(b) Except for provisions in this part which specify otherwise for particular drawbridges, clearance gauges shall be designed, installed, and maintained according to the provisions of § 118.160 of this chapter.
Note:
Clearance gauge requirements, if any, for drawbridges other than those referred to in this section are listed in Subpart B under the appropriate bridge.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 84-022, 51 FR 16308, May 2, 1986; CGD 96-026, 61 FR 33664, June 28, 1996]
§ 117.49 Process of violations.
(a) Complaints of alleged violations under this part are submitted to the District Commander of the Coast Guard District in which the drawbridge is located.
(b) Penalties for violations under this part are assessed and collected under Subpart 1.07 of Part 1 of this chapter.
Subpart B Specific Requirements
§ 117.51 General.
The drawbridges in this subpart are listed by the state in which they are located and by the waterway they cross. Waterways are arranged alphabetically by state. The drawbridges listed under a waterway are generally arranged in order from the mouth of the waterway moving upstream. The drawbridges on the Atlantic Intracoastal Waterway are listed from north to south and on the Gulf Intracoastal Waterway from east to west.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.55 Posting of requirements.
(a) The owner of each drawbridge under this subpart, other than removable span bridges, must ensure that a sign summarizing the requirements in this subpart applicable to the drawbridge is posted both upstream and downstream of the drawbridge. The requirements to be posted need not include those in subpart A of this part or §§ 117.51 and 117.59.
(b) The signs shall be of sufficient size and so located as to be easily read at any time from an approaching vessel.
(c) If advance notice is required to open the draw, the signs shall also state the name, address, and telephone number of the person to be notified.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2001-10881, 71 FR 70309, Dec. 4, 2006; USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 117.59 Special requirements due to hazards.
For the duration of occurrences hazardous to safety or navigation, such as floods, freshets, and damage to the bridge or fender system, the District Commander may require the owner of an operational drawbridge listed in this subpart to have the bridge attended full time and open on signal.
65 Alabama
§ 117.101 Alabama River.
(a) The Alabama & Gulf Coast Railway Drawbridge, mile 105.3, at Coy, shall open on signal if at least 24 hours notice is given.
(b) The draw of the Meridian and Bigbee Railroad (MNBR) Bridge, mile 205.9, at Selma, shall open on signal if at least 24 hours notice is given. An opening can be arranged by contacting the Meridian and Bigbee Railroad Roadmaster at 601-480-5071.
(c) The draw of the Canadian National/Illinois Central railroad bridge, mile 277 near Montgomery, shall open on signal if at least 24 hours notice is given.
(d) The draw of the CSX Transportation Railroad bridge, mile 293.3 near Montgomery, shall open on signal if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000; CGD08-03-018, 68 FR 34303, June 9, 2003; CGD08-04-001, 69 FR 5465, Feb. 5, 2004; USCG-2012-0181, 77 FR 57024, Sept. 17, 2012]
§ 117.103 Bayou La Batre.
The draw of SR 188 Bridge, mile 2.3, at Bayou La Batre, will open on signal every hour on the hour daily between 4 a.m. and 8 p.m., Monday through Sunday. The bridge need not open for the passage of vessels on the hours of 7 a.m., 3 p.m., and 4 p.m., Monday through Friday. Monday through Friday the draw will open on signal for the passage of vessels at 3:30 p.m. The bridge will remain closed to marine traffic from 8 p.m. to 4 a.m. daily except for emergencies.
[CGD08-05-001, 70 FR 37675, June 30, 2005]
§ 117.105 Bayou Sara.
(a) The draw of the CSX Transportation Railroad bridge, mile 0.1 near Saraland, shall open on signal; except that, from 6 p.m. to 10 a.m. the draw shall open on signal if at least eight hours' notice is given. During periods of severe storms or hurricanes, from the time the National Weather Service sounds an “alert” for the area until the “all clear” is sounded, the draw shall open on signal.
(b) The draw of the CSX Transportation Railroad bridge, mile 0.1 near Saraland, AL shall be remotely operated by the bridge tender at CSX's bridge remote control center in Mobile, Alabama. Vessels can contact the CSX bridge tender via VHF-FM channel 13 or by telephone at the number displayed on the signs posted at the bridge to request an opening of the draw.
(c) CSX will return the tender to the bridge location within 3 hours following any of the below situations:
(1) Any component of the remote operations system fails and prevents the remote operator from being able to visually identify vessels, communicate with vessels, detect vessels immediately underneath the bridge or visually identify trains approaching the bridge;
(2) CSX fails to meet Federal Railway Administration (FRA) or any other government agency safety requirements;
(3) Anytime at the direction of the District Commander.
[USCG-2019-0910, 87 FR 42648, July 18, 2022]
§ 117.106 Black Warrior River.
The draw of the Alabama Gulf Coast (AGR) vertical lift span (Yo-Yo) bridge across the Black Warrior River, mile 219.0, at Demopolis, shall operate as follows:
(a) The draw shall be maintained in the fully open-to-navigation position for vessels at all times, except during periods when it is closed for the passage of rail traffic.
(b) Railroad track circuits will initiate the automatic bridge opening and closing sequences. (Estimated duration that the bridge will remain closed for passage of rail traffic is 10 to 15 minutes.)
(c) Upon detecting an approaching train, the track circuits will initiate bridge closing warning consisting of continuous horn blowing and the navigation lights changing to flashing yellow. Photoelectric (infrared) boat detectors will monitor the waterway beneath the bridge for the presence of vessels.
(d) At the end of a six-minute warning period, if no vessels have been detected by the boat detectors, the bridge lowering sequence will automatically proceed taking approximately two minutes to complete. As soon as the bridge leaves the up position, the horn will silence but the navigation lights change to flashing red.
(e) Upon passage of the train, the bridge will automatically open unless another movement is detected. The navigation lights will continue to flash red until the bridge has returned to the full open position at which time they will change to steady green.
(f) The bridge can also be operated from two locked trackside control location (key releases) on the approach spans, one on each side of the movable span.
(g) To request openings of the bridge when the lift span is in the closed-to-navigation position, mariners may contact the AGR via VHF-FM channel 16 or by telephone at 205-654-4364.
[USCG-2012-0764, 77 FR 57028, Sept. 17, 2012]
§ 117.107 Chattahoochee River.
The draws of the CSX Transportation Railroad bridge, mile 117.1 near Omaha, GA, shall open on signal if at least six hours notice is given.
§ 117.109 Coosa River.
The draw of the CSX Transportation Railroad bridge, mile 175.0 at Gadsden, shall open on signal if at least six hours notice is given.
§ 117.111 Mobile River.
(a) The draw of the CSX Transportation Railroad bridge, mile 13.1 near Hurricane, AL shall be remotely operated by the bridge tender at CSX's bridge remote control center in Mobile, AL and shall open promptly and fully when signaled to open. Vessels can contact the CSX bridge tender via VHF-FM channel 13 or by telephone at the number displayed on the signs posted at the bridge to request an opening of the draw.
(b) CSX will return the tender to the bridge location within 3 hours following any of the below situations:
(1) Any component of the remote operations system fails and prevents the remote operator from being able to visually identify vessels, communicate with vessels, detect vessels immediately underneath the bridge or visually identify trains approaching the bridge;
(2) CSX fails to meet Federal Railway Administration (FRA) or any other government agency safety requirements;
(3) Anytime at the direction of the District Commander.
[USCG-2019-0911, 87 FR 42645, July 18, 2022]
§ 117.113 Tensaw River.
The draw of the CSX Transportation Railroad bridge, mile 15.0 at Hurricane, shall open on signal if at least ten-hours-notice is given. The draw shall open at the direction of the District Commander.
[USCG-2018-0956, 84 FR 65677, Nov. 29, 2019]
§ 117.118 Tombigbee River.
(a) The draw of the Meridian and Bigbee Railroad (MNBR) vertical lift span bridge across the Tombigbee River, mile 128.6 (Black Warrior Tombigbee (BWT) Waterway mile 173.6), at Naheola, shall operate as follows:
(1) The draw shall be maintained in the fully open-to-navigation position for vessels at all times, except during periods when it is closed for the passage of rail traffic.
(2) When a train approaches the bridge, it will stop and a crewmember from the train will observe the waterway for approaching vessels. If vessels are observed approaching the bridge, they will be allowed to pass prior to lowering the bridge. The crewmember will then announce via radiotelephone on VHF-FM channel 16 that the bridge is preparing to be lowered. If, after two minutes, no response has been received, the crewmember will initiate the lowering sequence.
(3) After the train has completely passed over the bridge, the crewmember will initiate the raising sequence. When the bridge is in the fully open-to-navigation position, the crewmember will announce via radiotelephone on VHF-FM channel 16 that the bridge is in the fully open-to-navigation position.
(4) To request openings of the bridge when the lift span is in the closed-to-navigation position, mariners may contact the MNBR via VHF-FM channel 16 or by telephone at 205-654-4364.
(b) The draw of the Norfolk Southern Railroad (NSRR) Vertical Lift Bridge across the Tombigbee River, mile 89.9, near Jackson, Washington and Clarke Counties, Alabama shall be operated as follows:
(1) The draw shall be kept in the open-to-vessel position, except during periods when it will close for the passage of rail traffic or to perform periodic maintenance authorized in accordance with subpart A of this part.
(2) When a train approaches the bridge, the draw tender will initiate the bridge closing warning signal, consisting of radio calls via VHF-FM channels 13 and 16 and activation of flashing red warning lights at each end of the span. The radio calls will be broadcast at five (5) minutes prior to bridge closing and at two (2) minutes prior to bridge closing. At the end of the two-minute warning period, if there are no vessels passing beneath the bridge or there have been no requests to pass beneath the bridge then the draw will automatically close. Upon passage of the train, the draw will return to the open-to-vessel position. The warning lights will continue to flash red until the draw is completely opened.
(3) The draw shall be remotely operated by the draw tender at Norfolk Southern Railroad's bridge control center in Decatur, Alabama. Closed Circuit TVs, infrared detectors and an Automatic Identification System have been installed at the bridge. Vessels can contact the NSRR draw tender via VHF-FM channel 13 or by telephone at the number displayed on the signs posted at the bridge to request an opening of the draw when the vertical lift span is in the closed-to-vessel position.
(4) NSRR will immediately provide an on-site bridge tender if:
(i) Any component of the remote operations system fails and prevents the remote operator from being able to visually identify vessels, communicate with vessels, detect vessels immediately underneath the bridge or visually identify trains approaching the bridge.
(ii) Anytime NSRR cannot meet Federal Railway Administration (FRA) or any other government agency safety requirements.
(iii) Anytime that the NSRR procedures or equipment to close or open the bridge listed in paragraph (b)(2) of this section fail.
(iv) When weather reaches a point where the remote draw tender cannot visually identify a vessel from the remote location.
(v) At the direction of the District Commander.
[USCG-2017-0108, 85 FR 33553, June 2, 2020]
66 Arkansas
§ 117.123 Arkansas Waterway.
(a) Across the Arkansas Waterway, the draw of the Rob Roy Drawbridge, mile 67.4, at Pine Bluff, Arkansas is maintained in the closed to navigation position and is remotely operated. Any vessel which requires an opening of the draw of this bridge shall establish contact by radiotelephone with the remote drawbridge operator on VHF-FM Channel 12 in Omaha, Nebraska. To establish contact, the vessel shall key the VHF-FM radio microphone four times in five seconds and listen for an acknowledgement tone. The remote drawbridge operator will then establish normal verbal radio communication on VHF-FM Channel 12 and advise the vessel whether the requested span can be immediately opened and will maintain constant radio contact with the vessel until the requested span has opened and vessel passage has been completed. The bridge is equipped with a Photoelectric Boat Detection System to prevent the span from lowering if there is an obstruction under the span. If the drawbridge cannot be opened immediately, the remote drawbridge operator will notify the calling vessel and provide an estimated time for a drawspan opening.
(b) Across the Arkansas Waterway, the draw of the Baring Cross Railroad Drawbridge, mile 119.6 at Little Rock, Arkansas, is maintained in the closed position and is remotely operated. Use the following procedures to request an opening of this bridge when necessary for transit:
(1) Normal flow procedures. Any vessel which requires an opening of the draw of this bridge shall establish contact by radiotelephone with the remote drawbridge operator on VHF-FM Channel 13 in Omaha, Nebraska. To establish contact, the vessel shall key the VHF-FM radio microphone four times in five seconds and listen for an acknowledgement tone. The remote drawbridge operator will then establish normal verbal radio communication on VHF-FM Channel 13 and advise the vessel whether the requested span can be immediately opened and will maintain constant radio contact with the vessel until the requested span has opened and vessel passage has been completed. The bridge is equipped with a Photoelectric Boat Detection System to prevent the span from lowering if there is an obstruction under the span. If the drawbridge cannot be opened immediately, the remote drawbridge operator will notify the calling vessel and provide an estimated time for a drawspan opening.
(2) High velocity flow procedures. The area from mile 118.2 to mile 125.4 is a regulated navigation area as described in § 165.817. During periods of high velocity flow rate of 70,000 cubic feet per second or greater at the Murray Lock and Dam, mile 125.4, downbound vessels which require that the draw of this bridge be opened for unimpeded passage shall contact the remote drawbridge operator as described in paragraph (b)(1) of this section either before departing Murray Lock and Dam or before departing the mooring cells at mile 121.5 to ensure that the drawspan is opened well in advance of arrival at the bridge. The remote drawbridge operator shall immediately respond to the vessel's contact, ensure the drawspan is open for passage, and ensure that it remains in the open to navigation position until the downbound vessel has safely passed through. If it cannot be opened immediately for unimpeded passage in accordance with § 165.817, the remote drawbridge operator will notify the downbound vessel and provide an estimated time for a drawspan opening. Upbound vessels shall request openings in accordance with the normal flow procedures as set forth in paragraph (b)(1) of this section. The remote drawbridge operator shall keep these approaching vessels informed of the position of the drawspan at all times until safe passage is completed.
(c) Across the Arkansas Waterway, the draw of the Van Buren Railroad Drawbridge, mile 300.8 at Van Buren, Arkansas, is maintained in the open position except as follows:
(1) When a train approaches the bridge, amber lights attached to the bridge begin to flash and an audible signal on the bridge sounds. At the end of 10 minutes, the amber light continues to flash; however, the audible signal stops and the draw lowers and locks if the photoelectric boat detection system detects no obstruction under the span. If there is an obstruction, the draw opens to its full height until the obstruction is cleared.
(2) After the train clears the bridge, the draw opens to its full height, the amber flashing light stops, and the mid channel lights change from red to green, indicating the navigation channel is open for the passage of vessels.
[CGD08-06-005, 71 FR 70879, Dec. 7, 2006, as amended by USCG-2007-0043, 73 FR 24868, May 6, 2008; USCG-2010-0441, 75 FR 65232, Oct. 22, 2010; USCG-2010-0228, 75 FR 66308, Oct. 28, 2010]
§ 117.125 Black River.
The Union Pacific Railroad Bridge, mile 3.4 at Paoquet need not open for the passage of vessels.
[USCG-2018-0443, 83 FR 30038, June 27, 2018]
§ 117.129 Little Red River.
The draws of the Burlington Northern railroad bridge, mile 25.0, and Arkansas highway bridge, mile 25.2, both at Judsonia, and the Arkansas highway bridge, mile 30.5 at Searcy, need not be opened for the passage of vessels.
§ 117.131 Little River.
The draws of the Burlington Northern railroad bridge, mile 7.1 near Fulton, need not be opened for the passage of vessels.
§ 117.133 Ouachita River.
The draw of the St. Louis Southwestern Railroad Bridge, Mile 338.8 near Camden, need not be open for the passage of vessels.
[CGD2 89-03, 55 FR 12820, Apr. 6, 1990, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998]
§ 117.135 Red River.
The draws of the bridges above mile 276.0 at the Arkansas Louisiana border, need not be opened for the passage of vessels.
§ 117.139 White River.
The draws of the St. Louis Southwestern railroad bridge, mile 98.9 at Clarendon, the Missouri Pacific railroad bridge, mile 196.3 at Augusta and the Missouri Pacific railroad bridge, mile 254.8 at Newport, shall open on signal if at least eight hours' notice is given. The draws of any of these bridges need not be opened for a vessel that arrives later than two hours after the time specified in the notice, unless a second notice of at least eight hours is given.
[USCG-2025-1113, 91 FR 3034, Jan. 26, 2026]
67 California
§ 117.140 General.
In California, when fog prevails by day or night, the drawtender, after sounding the opening signal, shall toll a bell continuously during the approach and passage of a vessel.
§ 117.141 American River.
The draw of the Jiboom Street bridge, mile 0.1 at Sacramento, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984]
§ 117.143 Bishop Cut.
The draw of the San Joaquin County(Eight Mile Road) Highway Bridge, mile 1.0 between King Island and Bishop Tract, must open on signal if at least 12 hours notice is given to the San Joaquin County Department of Public Works at Stockton.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2014-0410, 79 FR 38433, July 7, 2014]
§ 117.147 Cerritos Channel.
The draw of the Henry Ford Avenue railroad bridge, mile 4.8 at Long Beach, shall be maintained in the fully open position, except when a train is crossing or for maintenance. If the draw is in the closed position, the opening signal is two short blasts followed by one prolonged blast. The acknowledging signal is two prolonged blasts followed by one short blast when the draw will open immediately and five short blasts when the draw will not open immediately. Channel 13 (156.65 MHZ) or other assigned frequencies may be used.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984, as amended by CGD11-90-03, 61 FR 59026, Nov. 20, 1996; 62 FR 31724, June 11, 1997; USCG-1999-5832, 64 FR 34712, June 29, 1999; USCG-2017-0473, 82 FR 28997, June 27, 2017]
§ 117.149 China Basin, Mission Creek.
The draws of the Third Street bridge, mile 0.0, and the Fourth Street bridge, mile 0.2, both at San Francisco, shall open on signal if at least one hour notice is given.
[USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
§ 117.150 Connection Slough.
The draw of the Reclamation District No. 2027 bridge between Mandeville and Bacon Islands, mile 2.5 near Stockton, from May 15 through September 15, shall open on signal between the hours of 9 a.m. and 5 p.m., and it shall open upon 12 hours advance notice between the hours of 5 p.m. and 9 a.m.; and from September 16 through May 14 the draw shall open upon 12 hours advance notice between the hours of 9 a.m. and 5 p.m., and it shall open upon 24 hours advance notice between the hours of 5 p.m. and 9 a.m. Advance notice shall be given to the drawbridge operator by telephone at (209) 464-2959 or (209) 464-7928 weekdays between 8 a.m. and 5 p.m., and at (209) 993-8878 all other times.
[USCG-2008-1141, 74 FR 30227, June 25, 2009]
§ 117.151 Cordelia Slough (a tributary of Suisun Bay).
The draws of the Union Pacific railroad bridge, mile 1.5 at Suisun, shall open on signal if at least 24 hours notice is given.
§ 117.153 Corte Madera Creek.
The draw of the Golden Gate Bridge, Highway and Transportation District bridge, mile 0.5 near Greenbrae, shall be maintained in the fully open position, except for the crossing of trains or for maintenance.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998]
§ 117.155 Eureka Slough.
The drawspan for the Northwestern Pacific Railroad Authority Drawbridge, mile 0.3 at Eureka, need not be opened for the passage of vessels. The owner or agency controlling the drawbridge must restore the drawspan to full operation within six months of notification from the District Commander.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.157 Georgiana Slough.
The draws of the Sacramento County highway bridges, mile 4.5 near Isleton, and mile 12.4 near Walnut Grove, shall open on signal from 6 a.m. to 10 p.m. from May 1 through October 31. The draws shall open on signal from November 1 through April 30 from 9 a.m. to 5 p.m. At all other times, the draws of these bridges shall open on signal if at least four hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8.
§ 117.159 Grant Line Canal.
The draw of the San Joaquin County highway bridge, mile 5.5 at Tracy, shall open on signal if at least 12 hours notice is given to the San Joaquin County Department of Public Works at Stockton.
§ 117.161 Honker Cut.
The draw of the San Joaquin County (Eightmile Road) bridge, mile 0.3 between Empire Tract and King Island at Stockton, shall open on signal if at least 12 hours notice is given to the San Joaquin County Department of Public Works at Stockton.
§ 117.162T Honker Cut.
The draw of the San Joaquin County (Eightmile Road) bridge, mile 0.3 between Empire Tract and King Island at Stockton need not open for the passage of vessels.
§ 117.163 Islais Creek (Channel).
(a) The draw of the Illinois Street drawbridge, mile 0.3 at San Francisco, shall open on signal if at least 72 hours advance notice is given to the Port of San Francisco.
(b) The draw of the Third Street drawbridge, mile 0.4 at San Francisco, shall open on signal if at least 72 hours advance notice is given to the San Francisco Department of Public Works.
[USCG-2008-0648, 73 FR 74019, Dec. 5, 2008, as amended by USCG-2018-0874, 84 FR 30879, June 28, 2019]
§ 117.165 Lindsey Slough.
The center drawspan of the Hastings Farms Highway Bridge, mile 2.0 between Egbert and Lower Hastings Tracts, must be removed for the passage of vessels if at least 72 hours notice is given to the Hastings Island Land Company office at Rio Vista.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.167 Little Potato Slough.
The draw of the California Department of Transportation highway bridge, mile 0.1, at Terminus, shall open on signal if at least 4 hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8.
[CGD11-95-02, 61 FR 17248, Apr. 19, 1996]
§ 117.169 Mare Island Strait and the Napa River.
(a) The draw of the Mare Island Drawbridge, mile 2.8, at Vallejo shall open on signal between the hours of 9 a.m. and 7 p.m. daily, and upon two hours advance notice all other times. When the drawbridge operator is present, mariners may contact the drawbridge via marine radio or telephone at (707) 648-4313 for drawspan operation. When the drawbridge operator is not present, mariners may contact the City of Vallejo via the same telephone number to schedule drawspan operation.
(b) The draw of the Northwestern Pacific railroad bridge, mile 10.6 at Brazos, shall be maintained in the fully open position, except for the crossing of trains or for maintenance. When the draw is closed and visibility at the drawtender's station is less than one mile, up or down the channel, the drawtender shall sound two prolonged blasts every minute. When the draw is opened, the drawtender shall sound three short blasts.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 12-85-02, 50 FR 20758, May 20, 1985; USCG-1999-5832, 64 FR 34712, June 29, 1999; CGD11-03-006, 69 FR 21958, Apr. 23, 2004; CGD 11-05-025, 70 FR 20467, Apr. 20, 2005]
§ 117.171 Middle River.
(a) The draw of the San Joaquin County (Bacon Island Road) highway bridge, mile 8.6 between Bacon Island and Lower Jones Tract, shall open on signal from May 15 through September 15 from 9 a.m. to 5 p.m. From September 16 through May 14, the draw shall open on signal from 9 a.m. to 5 p.m. from Thursday through Monday. At all other times, the draw shall open on signal if at least 12 hours notice is given to the San Joaquin County Department of Public Works at Stockton.
(b) The draw of the Burlington Northern Santa Fe railroad bridge, mile 9.8 near Middle River Station, shall open on signal if at least 12 hours notice is given to the Burlington Northern Santa Fe Railway Manager of Structures at San Bernardino.
(c) The removable span of the Woodward Island Bridge, mile 11.8 near Discovery Bay, shall be removed as soon as possible upon notification by the District Commander that an emergency exists which requires its removal.
(d) The California Route 4 Bridge, mile 15.1, between Victoria Island and Drexler Tract need not open for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984, as amended by CGD 12-85-01, 50 FR 26559, June 27, 1985; USCG-2000-7223, 65 FR 40056, June 29, 2000; USCG-2020-0137, 86 FR 1807, Jan. 11, 2021]
§ 117.173 Miner Slough.
The draw of the California Department of Transportation highway bridge, mile 5.5 between the northerly end of Ryer Island and Holland Tract, shall open on signal if at least 12 hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8.
§ 117.175 Mokelumne River.
(a) The draw of the California Department of Transportation highway bridge, the Mokelumne River Bridge, mile 3.0, at East Isleton shall open upon signal as follows:
(1) From November 1 through April 30 from 9 a.m. to 5 p.m.
(2) From May 1 through October 31 from 6 a.m. to 10 p.m., except that during the following periods the draw need only open for recreational vessels on the hour, 20 minutes past the hour, and 40 minutes past the hour:
Saturdays 10 a.m. until 2 p.m. Sundays 11 a.m. until 6 p.m. Memorial Day; 4th of July; and Labor Day 11 a.m. until 6 p.m.
(3) At all other times the draw shall open on signal if at least 4 hours notice is given to the drawtender at Rio Vista bridge over the Sacramento River, mile 12.8.
(4) Emergency vessels of the United States, state or commercial vessels engaged in rescue or emergency salvage operations, and vessels in distress shall be passed as soon as possible but no later than one hour after notice is given.
(b) The draw of the Sacramento and San Joaquin counties (Millers Ferry) highway bridge, mile 12.1 over the North Fork of the Mokelumne River near Walnut Grove, shall open on signal from May 1 through October 31 from 9 a.m. to 5 p.m. At all other times, the draw shall open on signal if at least 12 hours notice is given to the San Joaquin County Department of Public Works at Stockton.
(c) The removable span of the San Joaquin County highway bridge over the South Fork of the Mokelumne River, mile 18.0 at New Hope Landing, shall be removed as soon as possible upon notification by the District Commander that an emergency exists which requires the removal.
(d) The draws of the bridges above New Hope Landing need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 11-92-10, 58 FR 33339, June 17, 1993; USCG-2018-0874, 84 FR 30879, June 28, 2019]
§ 117.177 Mud Slough.
The draw of the Union Pacific railroad bridge, mile 0.7 near Alviso, shall open on signal if at least 24 hours notice is given.
§ 117.179 Newark Slough.
The draw of the San Mateo County Transportation Department railroad bridge, mile 0.5 near Newark, shall open on signal if at least 24 hours notice is given to the San Mateo Transportation Department, at San Carlos.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998]
§ 117.181 Oakland Inner Harbor Tidal Canal.
The draws of the Alameda County highway drawbridges at Park Street, mile 5.2; Fruitvale Avenue, mile 5.6; and High Street, mile 6.0; and the U.S. Army Corps of Engineers railroad drawbridge, mile 5.6 at Fruitvale Avenue, shall open on signal; except that, from 8 a.m. to 9 a.m. and 4:30 p.m. to 6:30 p.m. Monday through Friday except Federal holidays, the draws need not be opened for the passage of vessels. However, the draws shall open during the above closed periods for vessels which must, for reasons of safety, move on a tide or slack water, if at least two hours notice is given.
[CGD 11-11-99-013, 66 FR 18725, Apr. 11, 2001, as amended by USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.183 Old River.
The draw of the California Department of Transportation (Route 4) highway bridge, mile 14.8 between Victoria Island and Byron Tract, shall open on signal if at least four hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8.
[USCG-2021-0181, 87 FR 9447, Feb. 22, 2022]
§ 117.185 Pacheco Creek.
The draw of the Contra Costa County highway bridge, mile 1.0, and Union Pacific Railroad bridge, mile 1.1, both near Martinez, shall open on signal if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 12-85-02, 50 FR 20758, May 20, 1985]
§ 117.187 Petaluma River.
(a) The draw of the SMART Blackpoint railroad bridge, mile 0.8 at Blackpoint, shall be maintained in the fully open position, except for the crossing of trains or for maintenance. When the draw is closed and visibility from the drawtender's station is less than one mile up or down the channel, the drawtender shall sound two long blasts every minute. When the draw is reopened, the drawtender shall sound three short blasts.
(b) The draw of the SMART Haystack Landing railroad bridge, mile 12.4 at Petaluma, shall open on signal from 3 a.m. to 11 p.m. if at least 30 minutes notice is given to the drawtender. At all other times, the draw shall be maintained in the fully open position, except for the crossing of trains or for maintenance. When the draw is closed and visibility from the drawtender's station is less than one mile up or down the channel, the drawtender shall sound two long blasts every minute. When the draw is reopened, the drawtender shall sound three short blasts.
(c) The draw of the Petaluma highway bridge at “D” Street, mile 13.7, at Petaluma, shall open on signal if at least four hours notice is given for openings from 6 a.m. to 6 p.m., and if at least 24 hours notice is given for openings from 6 p.m. to 6 a.m.
[USCG-2018-0091, 84 FR 56701, Oct. 23, 2019]
§ 117.189 Sacramento River.
(a) The draws of each bridge from Isleton to the American River junction except for the Sacramento County highway bridge across the Sacramento River, mile 46.0 at Freeport, shall open on signal from May 1 through October 31 from 6 a.m. to 10 p.m. and from November 1 through April 30 from 9 a.m. to 5 p.m. At all other times, the draws shall open on signal if at least four hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8.
(b) The draw of the Sacramento County highway bridge, mile 46.0 at Freeport, shall open on signal from May 1 through September 30 from 9 a.m. to 5 p.m. At all other times, the draw shall open on signal if at least four hours notice is give to the drawtender at the Rio Vista Bridge across the Sacramento River, mile 12.8.
(c) The draws of the California Department of Transportation bridges, mile 90.1 at Knights Landing, and mile 135.5 at Meridian, shall open on signal if at least 12 hours notice is given to the California Department of Transportation at Marysville.
(d) The draws of the bridges above Meridian need not be opened for the passage of vessels.
[USCG-2011-1138, 77 FR 74777, Dec. 18, 2012, as amended by USCG-2024-0745, 89 FR 87500, Nov. 4, 2024]
§ 117.191 San Joaquin River.
(a) The draw of the Port of Stockton railroad bridge, mile 39.7 at Stockton, shall open on signal if at least 12 hours notice is given to the Port Director.
(b) The draws of the U.S. Navy Draw-bridge, mile 39.8, Burlington Northern Santa Fe railroad bridge, mile 40.6, and California Highway 4 bridge (Garwood Bridge), mile 41.6, need not be opened for the passage of vessels. The owners or agencies controlling the bridges shall restore the draws to full operation within six months of notification to take such action from the District Commander.
(c) Drawbridges above the Old River junction need not open for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 12-85-06, 50 FR 31177, Aug. 1, 1985; CGD 88-052, 53 FR 25120, July 1, 1988; USCG-1999-5832, 64 FR 34712, June 29, 1999]
§ 117.193 San Leandro Bay.
The drawspans of the California Department of Transportation highway and bicycle drawbridges, mile 0.0 and mile 0.1, between Alameda and Bay Farm Island, must open on signal; except that, from 5 a.m. to 8 a.m. and 5 p.m. to 9 p.m., the drawspans must open on signal if at least 12 hours notice is given. Notice must be given to the drawtender of the Bay Farm Island drawbridges from 8 a.m. to 5 p.m. and to the drawtender of the Park Street Drawbridge at Alameda at all other times. The drawspans need not be opened for the passage of vessels from 9 p.m. to 5 a.m.
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006, as amended by USCG-2018-0874, 84 FR 30879, June 28, 2019]
§ 117.195 Snodgrass Slough.
The draw of the Sacramento County bridge, mile 4.4 at Walnut Grove, shall open on signal if at least 72 hours notice is given to Sacramento County Transportation Operations and Maintenance office at Sacramento.
[CGD11-93-02, 59 FR 13248, Mar. 21, 1994, as amended by USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
§ 117.197 Sonoma Creek.
The draw of the Northwestern Pacific railroad bridge, mile 5.4 at Wingo, shall open on signal if at least 24 hours notice is given.
§ 117.199 Steamboat Slough.
The draw of the California Department of Transportation highway bridge, mile 11.2 at the head of Grand Island, shall open on signal from May 1 through October 31 from 6 a.m. to 10 p.m. At all other times, the draw shall open on signal if at least four hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8.
§ 117.201 Sutter Slough.
The draw of the Sacramento County highway bridge, mile 6.4 near Courtland, need not be opened for the passage of vessels. However, the draw shall be returned to operable condition within six months after notification by the District Commander to do so.
68 Connecticut
§ 117.202 Cold Spring Brook.
The draw of the footbridge, mile 0.1 at Saybrook, shall open within 15 minutes of a mariner's request by telephone. To enable mariners to request bridge openings, the owner shall maintain and monitor a telephone at the bridge and provide a means for mariners to secure their boats upstream and downstream of the bridge in order to use this telephone.
[CGD3 86-33, 52 FR 5536, Feb. 25, 1987]
§ 117.205 Connecticut River.
(a) The owners of the AMTRAK Old Saybrook-Old Lyme Bridge, mile 3.4 the Route 82 Bridge, mile 16.8, and the CONRAIL Middletown-Portland Bridge, mile 32.0, shall provide, and keep in good legible condition, clearance gauges with figures not less than twelve (12) inches which designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(b) The draws of the AMTRAK Old Saybrook-Old Lyme Bridge, mile 3.4, and the CONRAIL Middletown-Portland Bridge, mile 32.0, shall be opened as soon as practicable for all non-commercial vessels that cannot pass under the closed draws, but in no case shall the delay be more than 20 minutes from the time the opening was requested.
(c) The draw of the Route 82 Bridge, mile 16.8, at East Haddam, shall operate as follows:
(1) From May 1 through October 31: The draw shall open on signal for commercial vessels. For recreational vessels, the draw shall open on signal, except that from 6 a.m. to 8 p.m., the draw need open for recreational vessels on the hour only.
(2) From November 1 through April 30: The draw shall open on signal for all vessels, except that from 8 p.m. to 4 a.m., the draw shall open on signal if at least six-hours notice is given by calling the number posted at the bridge.
[CGD01-95-009, 63 FR 10140, Mar. 2, 1998, as amended by USCG-2016-1006, 82 FR 32762, July 18, 2017]
§ 117.207 Housatonic River.
(a) The draw of the US 1 Bridge, mile 3.5, at Stratford, shall open on signal; except that, from 7 a.m. to 9 a.m., Monday through Friday, and 4 p.m. to 5:45 p.m. daily, the draw need not open for the passage of vessels. From December 1 through March 31, from 8 p.m. to 4 a.m., the draw shall open on signal if at least six-hours notice is given by calling the number posted at the bridge.
(b) The draw of the Metro-North (Devon) bridge, mile 3.9 at Stratford, shall operate as follows:
(1) The draw shall open on signal between 4:30 a.m. and 9 p.m. after at least a two-hour advance notice is given; except that, from 5:45 a.m. through 9:45 a.m. and from 4 p.m. through 8 p.m., Monday through Friday excluding holidays, the draw need not open for the passage of vessel traffic unless an emergency exists.
(2) From 9 p.m. through 4:30 a.m. the draw shall open on signal after at least a four-hour advance notice is given.
(3) A delay in opening the draw not to exceed 10 minutes may occur when a train scheduled to cross the bridge without stopping has entered the drawbridge lock.
(4) Requests for bridge openings may be made by calling the bridge via marine radio VHF FM Channel 13 or the telephone number posted at the bridge.
[CGD 82-025, 49 FR 43458, Oct. 29, 1984, as amended by CGD3 85-42, 50 FR 26711, June 28, 1985; CGD01-99-085, 64 FR 60673, Nov. 8, 1999; USCG-2022-0519, 89 FR 4549, Jan. 24, 2024]
§ 117.209 Mianus River.
The draw of the Metro-North (Cos Cob) bridge, mile 1.0 at Greenwich, will operate as follows:
(a) The draw will open on signal between 4:30 a.m. and 9 p.m. after at least a two-hour advance notice is given; except that, from 5:45 a.m. through 9:45 a.m. and from 4 p.m. through 8 p.m., Monday through Friday excluding holidays, the draw need not open for the passage of vessel traffic unless an emergency exists.
(b) From 9 p.m. through 4:30 a.m. the draw will open on signal after at least a four-hour advance notice is given.
(c) A delay in opening the draw not to exceed 10 minutes may occur when a train scheduled to cross the bridge without stopping has entered the drawbridge lock.
(d) Requests for bridge openings may be made by calling the bridge via marine radio VHF FM Channel 13 or the telephone number posted at the bridge.
[USCG-2022-0520, 89 FR 4551, Jan. 24, 2024]
§ 117.211 Mystic River.
(a) The draw of the Amtrak railroad bridge, mile 2.4 at Mystic, shall operate as follows:
(1) From April 1 to October 31, the draw shall open on signal.
(2) From November 1 to March 31, the draw shall open on signal from 5 a.m. to 9 p.m. From 9 p.m. to 5 a.m., the draw shall open on signal if at least eight hours notice is given.
(3) Commercial vessels shall be passed immediately at any time; however, the opening may be delayed up to eight minutes to allow trains, which have entered the drawbridge block and are scheduled to cross the bridge without stopping, to clear the block.
(4) All other vessels shall be passed as soon as practicable but no later than 20 minutes after the signal to open is given.
(b) The draw of the U.S. 1 Bridge, mile 2.8, at Mystic, shall open on signal except:
(1) From May 1 through October 31, from 7:40 a.m. to 6:40 p.m., the draw need only open hourly at twenty minutes before the hour.
(2) From November 1 through April 30, from 8 p.m. to 4 a.m., the draw shall open on signal if at least six-hours notice is given by calling the number posted at the bridge.
[CGD 82-025, 49 FR 43458, Oct. 29, 1984, as amended by CGD3 84-31, 50 FR 26710, June 28, 1985; CGD01-99-079, 64 FR 60675, Nov. 8, 1999; CGD01-03-115, 69 FR 31008, June 2, 2004]
§ 117.213 New Haven Harbor, Quinnipiac and Mill Rivers.
The draws of the Tomlinson Bridge, mile 0.0, the Ferry Street Bridge, mile 0.7, and the Grand Avenue Bridge, mile 1.3, across the Quinnipiac River, and the Chapel Street Bridge, mile 0.4, across the Mill River, shall operate as follows:
(a) The draw of the Tomlinson Bridge at mile 0.0, across the Quinnipiac River shall open on signal; except that, from 7:30 a.m. to 8:30 a.m., noon to 12:15 p.m., 12:45 p.m. to 1 p.m., and 4:45 p.m. to 5:45 p.m., Monday through Friday, except Federal holidays, the draw need not open for the passage of vessel traffic.
(b) The draw of the Ferry Street Bridge at mile 0.7, across Quinnipiac River, shall open on signal; except that, from 7:30 a.m. to 8:30 a.m. and 4:45 p.m. to 5:45 p.m., Monday through Friday, except Federal holidays, the draws need not open for the passage of vessel traffic. From 9 p.m. to 5 a.m. the draw shall open on signal if at least a one-hour advance notice is given by calling the number posted at the bridge.
(c) The draw of the Grand Avenue Bridge at mile 1.3, across the Quinnipiac River shall open on signal; except that, from 7:30 a.m. to 8:30 a.m. and 4:45 p.m. to 5:45 p.m., Monday through Friday, except Federal holidays, the draw need not open for the passage of vessel traffic. From 9 p.m. to 5 a.m. the draw shall open on signal if at least a one-hour advance notice is given by calling the number posted at the bridge.
(d) The draw of the Chapel Street Bridge at mile 0.4, across the Mill River shall open on signal; except that, from 7:30 a.m. to 8:30 a.m. and 4:45 p.m. to 5:45 p.m., Monday through Friday, except Federal holidays, the draw need not open for the passage of vessel traffic. From 9 p.m. to 5 a.m. the draw shall open on signal after at least a one-hour advance notice is given by calling the number posted at the bridge.
[USCG-2009-1021, 78 FR 13481, Feb. 28, 2013]
§ 117.215 Niantic River.
(a) The draw of the Amtrak Bridge, mile 0.0, at Niantic, shall open on signal at all times. When a train scheduled to cross the bridge without stopping has entered the drawbridge block, a delay in opening the draw may occur until the train has cleared the block. The delay should not exceed 10 minutes.
(b) The draw of the S156 Bridge, mile 0.1, at Niantic, shall open on signal; except that, from 7 a.m. to 8 a.m., and 4 p.m. to 5 p.m., Monday through Friday, except holidays, the draw shall open only for the passage of commercial vessels. From November 1 through April 30, from 8 p.m. to 4 a.m., the draw shall open on signal if at least six hours notice is given by calling the number posted at the bridge.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984; CGD01-99-087, 64 FR 61519, Nov. 12, 1999, as amended by USCG-2015-0218, 80 FR 35243, June 19, 2015; USCG-2019-0545, 84 FR 70427, Dec. 23, 2019]
§ 117.217 Norwalk River.
(a) The draw of the Washington Street S136 Bridge, mile 0.0, at Norwalk, shall operate as follows:
(1) The draw shall open on signal; except that, from 7 a.m. to 8:45 a.m., 11:45 a.m. to 1:15 p.m., and 4 p.m. to 6 p.m., Monday through Friday, except holidays, the draw need not be opened for the passage of vessels that draw less than 14 feet of water.
(2) The draw need not open for the passage of vessel traffic, from 10 a.m. to 12 p.m., on the first Saturday in December, to facilitate the running of the annual Norwalk River Fun Run. Should inclement weather force the postponement of the race the above bridge closure shall be implemented the next day, the first Sunday after the first Saturday in December, from 10 a.m. to 12 p.m.
(3) The bridge opening signal is three short blasts. Vessels drawing 14 feet of water or more shall add one prolonged blast after the three short blasts.
(b) The draw of the Metro-North “WALK” Bridge, mile 0.1, at Norwalk, shall operate as follows:
(1) The draw shall open on signal between 4:30 a.m. and 9 p.m. after at least a two hour advance notice is given; except that, from 5:45 a.m. through 9:45 a.m. and from 4 p.m. through 8 p.m., Monday through Friday excluding holidays, the draw need not open for the passage of vessel traffic unless an emergency exists.
(2) From 9 p.m. through 4:30 a.m. the draw shall open on signal after at least a four hour advance notice is given.
(3) A delay in opening the draw not to exceed 10 minutes may occur when a train scheduled to cross the bridge without stopping has entered the drawbridge lock.
(4) Requests for bridge openings may be made by calling the bridge via marine radio VHF FM Channel 13 or the telephone number posted at the bridge.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 85-42, 50 FR 26711, June 28, 1985; CGD01-07-019, 72 FR 51180, Sept. 6, 2007; USCG-2014-1057, 81 FR 45022, July 12, 2016]
§ 117.219 Pequonnock River.
(a) The draw of the Stratford Avenue Bridge at mile 0.1, at Bridgeport, shall open on signal; except that, from 6:45 a.m. to 7:15 a.m., 7:45 a.m. to 8:15 a.m., 11:45 a.m. to 1:15 p.m., and 4:30 p.m. to 6:10 p.m., the draw need not open for the passage of vessel traffic. From December 1 through March 31, from 8 p.m. to 4 a.m., the draw shall open on signal if at least a six-hour notice is given by calling the number posted at the bridge.
(b) The draw of the Metro-North Peck Bridge at mile 0.3, at Bridgeport shall operate as follows:
(1) The draw shall open on signal between 5:45 a.m. to 9 p.m. if at least four hours advance notice is given; except that, from 5:45 a.m. to 9:45 a.m., and 4 p.m. to 8 p.m., Monday through Friday excluding holidays, the draw need not open for the passage of vessel traffic unless an emergency exists.
(2) From 9 p.m. to 5:45 a.m., the draw shall open on signal if at least an eight hour notice is given.
(3) A delay in opening the draw not to exceed 15 minutes may occur when a train scheduled to cross the bridge without stopping has entered the drawbridge block.
(4) Requests for bridge openings may be made by calling the telephone number posted at the bridge.
[USCG-2010-0787, 75 FR 55477, Sept. 13, 2010, as amended by USCG-2017-0750, 83 FR 3963, Jan. 29, 2018; USCG-2023-0175, 88 FR 56471, Aug. 18, 2023]
§ 117.221 Saugatuck River.
(a) Public vessels of the United States must be passed through as soon as possible.
(b) The draw of the Metro-North “SAGA” bridge, mile 1.1 at Saugatuck, shall operate as follows:
(1) The draw shall open on signal between 4:30 a.m. and 9 p.m. after at least a two-hour advance notice is given; except that, from 5:45 a.m. through 9:45 a.m. and from 4 p.m. through 8 p.m., Monday through Friday excluding holidays, the draw need not open for the passage of vessel traffic unless an emergency exists.
(2) From 9 p.m. through 4:30 a.m. the draw shall open on signal after at least a four-hour advance notice is given.
(3) A delay in opening the draw not to exceed 10 minutes may occur when a train scheduled to cross the bridge without stopping has entered the drawbridge lock.
(4) Requests for bridge openings may be made by calling the bridge via marine radio VHF FM Channel 13 or the telephone number posted at the bridge.
(c) The draw of the Route 136 Bridge, mile 1.3 at Saugatuck shall operate as follows:
(1) Year-round, need not open weekdays, except Federal holidays, from 7 a.m. to 8:30 a.m. and 5:30 p.m. to 7:30 p.m.
(2) From April 15-October 31, open on signal if at least two hours notice is given, except as provided in paragraph (c)(1) of this section.
(3) From November 1-April 14, open on signal:
(i) From 8:30 a.m. to 3 p.m. if at least eight hours notice is given;
(ii) From 3 p.m. to 8:30 a.m., if at least 24 hours notice is given, except as provided in paragraph (c)(1) of this section.
[CGD 82-087, 50 FR 13319, Apr. 4, 1985, as amended by USCG-2001-10881, 71 FR 70309, Dec. 4, 2006; USCG-2022-0518, 89 FR 4553, Jan. 24, 2024]
§ 117.223 Shaw Cove.
The draw of the Amtrak bridge, mile 0.0 at New London, shall open on signal from December 1 through March 31 from 8 a.m. to 5 p.m. Monday through Friday. From December 1 through March 31 from 5 p.m. to 8 a.m. and on Saturdays and Sundays, the draw shall open on signal if at least eight hours notice is given. From April 1 through November 30 from 5 a.m. to 10 p.m., the draw shall open on signal; and, from 10 p.m. to 5 a.m., the draw shall open on signal if at least one hour notice is given. A delay of up to 10 minutes may be expected if a train is approaching so closely that it may not be safety stopped. When a vessel is in an emergency that may endanger life or property, the draw shall open as soon as possible.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 43459, Oct. 29, 1984]
§ 117.224 Thames River.
The draw of the Amtrak Bridge, mile 3.0, at New London, shall operate as follows:
(a) The draw shall open on signal to 75 feet above mean high water for all vessel traffic unless a full bridge opening to 135.3 feet above mean high water is requested.
(b) The 75 foot opening will be signified by a range light display with one solid green light and one flashing green light and the full 135.3 foot opening will be signified with two solid green range lights.
(c) The draw shall open on signal for public vessels of the United States and commercial vessels; except that, when a train scheduled to cross the bridge without stopping has passed the Midway, Groton, or New London stations and is in motion toward the bridge, the lift span shall not be opened until the train has crossed the bridge.
(d) The draw shall open on signal as soon as practicable for all other vessel traffic but no later than 20 minutes after the signal to open is given.
[USCG-2013-0983, 80 FR 4, Jan. 2, 2015]
§ 117.225 Yellow Mill Channel.
The drawspan of the Stratford Avenue Bridge, mile 0.3 at Bridgeport, must open on signal if at least 24-hours notice is given. Public vessels of the United States must pass through as soon as possible.
[USCG-2001-10881, 71 FR 70310, Dec. 4, 2006]
69 Delaware
§ 117.231 Brandywine Creek.
The draw of the Conrail bridge, mile 1.1, the Church Street bridge, mile 1.3, and the Sixteenth Street bridge, mile 1.7, all at Wilmington, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 85-42, 50 FR 26712, June 28, 1985]
§ 117.233 Broad Creek.
The draws of the Norfolk Southern bridge, mile 8.0, the Poplar Street Bridge, mile 8.2 and the U.S. 13A Bridge, mile 8.25, all in Laurel, need not open for the passage of vessels.
[USCG-2015-1011, 81 FR 33591, May 27, 2016]
§ 117.234 Cedar Creek.
The SR 36 Bridge, mile 0.5 in Cedar Beach, shall open on signal. From April 1 through November 30 from 2 a.m. to 4 a.m.; and from December 1 through March 31 from 6:30 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given.
[CGD05-06-044, 71 FR 53325, Sept. 11, 2006]
§ 117.235 Chesapeake and Delaware Canal.
The draw of the Conrail bridge, mile 7.7, is operated by the Delmarva Central Railroad Company and shall open on signal. The following light signals, located in the center of the drawspan on both sides of the bridge, shall be used:
(a) When the draw is to be opened immediately, one fixed amber light.
(b) When the draw is not ready to be opened, one flashing red light.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
§ 117.237 Christina River.
(a) The owners of the bridges on this waterway:
(1) Shall provide and keep in good legible condition two board gages painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridges that they are plainly visible to the operator of each vessel approaching the bridge either up or downstream.
(2) Shall open on signal except that the draw of a railroad bridge need not be opened when a train is in the bridge block, approaching the bridge, or within 5 minutes of the passage of a passenger train; but in no event shall the opening of the draw be delayed more than 10 minutes.
(b) The draw of the Norfolk Southern Railroad Bridge, mile 1.4 at Wilmington, shall operate as follows:
(1) The draw shall remain in the open position for navigation. The draw shall only be closed for train crossings or periodic maintenance authorized in accordance with subpart A of this part.
(2) The bridge shall be operated by the controller at the Harrisburg, PA Dispatcher's Office. The controller shall monitor vessel traffic with closed circuit cameras and infrared sensors covering the swing radius. Operational information will be provided 24 hours a day on marine channel 13 and via telephone 470-463-1102.
(3) The bridge shall not be operated from the remote location in the following events: Failure or obstruction of the infrared sensors, closed-circuit cameras or marine-radio communications, or anytime controller's visibility is inhibited. In these situations, a bridge tender with Norfolk Southern must be called and on-site within 30 minutes.
(4) Before the bridge closes for any reason, the remote operator will monitor waterway traffic in the area. The bridge shall only be closed if the off-site remote operator's visual inspection shows that the channel is clear and there are no vessels transiting in the area. While the bridge is moving, the operator shall maintain constant surveillance of the navigation channel.
(5) Before closing the draw, the channel traffic lights would change from flashing green to flashing red, the horn will sound five short blasts, and an audio voice warning stating, “Attention, Attention. Norfolk Southern Railroad Bridge over Christina River at milepost 1.4 will be closing to river traffic.” Five short blasts of the horn will continue until the bridge is seated and locked down to vessels. The channel traffic lights will continue to flash red.
(6) When the rail traffic has cleared, the horn will sound one prolonged blast followed by one short blast to indicate the draw is opening to vessel traffic. During the opening swing movement, the channel traffic lights would flash red until the bridge returns to the fully open position. In the full open position to vessels, the bridge channel lights will flash green followed by an announcement stating, “Security, security, security. Norfolk Southern Railroad Bridge over Christina River at mile 1.4 is open for river traffic.” Vessels shall stay clear of both channels as to not interfere with infrared detectors, until green lights are displayed on the swing span.
(c) In Wilmington DE, the draw of the Third Street Bridge at mile 2.3, shall open on signal, the draws of the Walnut Street Bridge at mile 2.8, and the Market Street Bridge at mile 3.0, shall open on signal if at least eight hours notice is given. From 7 a.m. to 8 a.m. and 4:30 p.m. to 5:30 p.m., Monday through Saturday except holidays, the draws of these three bridges need not be opened for the passage of vessels. Any vessel which has passed through one or more of these bridges immediately prior to a closed period and which requires passage through the other bridge or bridges in order to continue to its destination shall be passed through the draw or draws of the bridge or bridges without delay.
(d) The draws of the Norfolk Southern Railroad bridges, at miles 4.1 and 4.2, both at Wilmington, shall open on signal from 6 a.m. to 8 p.m. if at least 24 hours notice is given. From 8 p.m. to 6 a.m., the draws need not be opened for the passage of vessels.
(e) The draw of the SH141 bridge, mile 7.5 at Wilmington, shall open on signal if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 84-06, 49 FR 33448, Aug. 23, 1984, CGD3 85-42, 50 FR 26712, June 28, 1985; CGD 87-035, 52 FR 33812, Sept. 8, 1987; CGD05-04-168, 70 FR 4016, Jan. 28, 2005; USCG-2012-1085, 78 FR 61182, Oct. 3, 2013; USCG-2022-0323, 88 FR 10029, Feb. 16, 2023]
§ 117.239 Lewes and Rehoboth Canal.
(a) The draw of the Savannah Road/SR 18 Bridge, at mile 1.7, in Lewes shall open on signal if at least four hours notice is given.
(b) The draw of the SR 14A Bridge, at mile 6.7, in Rehoboth shall open on signal if at least 24 hours notice is given.
[CGD05-06-089, 72 FR 5619, Feb. 7, 2007]
§ 117.241 Mispillion River.
The draw of the Route 1/Rehoboth Blvd. Bridge, at mile 11.0, at Milford shall open on signal if at least 24 hours notice is given.
[CGD05-06-089, 72 FR 5619, Feb. 7, 2007, as amended by USCG-2011-0257, 76 FR 31837, June 2, 2011]
§ 117.243 Nanticoke River.
(a) The draw of the Norfolk Southern Railway Bridge, mile 39.4 in Seaford, will operate as follows:
(1) From March 15 through November 15, the draw will open on signal for all vessels except that from 11 p.m. to 5 a.m. at least 2 1/2 hours notice will be required.
(2) At all times, from November 16 through March 14, the draw will open on signal if at least 2 1/2 hours notice is given.
(3) When notice is required, the owner operator of the vessel must contact the bridge operator (Delmarva Central Railroad Company) with an estimated time of passage by calling 1-802-774-0305.
(b) The draw of the SR 13 Bridge, mile 39.6, in Seaford shall:
(1) Open on signal, except from 6 p.m. to 8 a.m., from April 1 through October 31; from November 1 through March 31, Monday to Friday and on Saturday and Sunday from 3:30 p.m. to 7:30 a.m., if at least four hours notice is given.
(2) Open on signal, on Saturday and Sunday, from 7:31 a.m. through 3:29 p.m., from November 1 through March 31, if at least 24 hours notice is given.
[CGD05-06-044, 71 FR 53325, Sept. 11, 2006, as amended by USCG-2017-0162, 82 FR 50084, Oct. 30, 2017; USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
§ 117.245 Smyrna River.
The draw of the Delaware highway bridge, mile 4.0 at Flemings Landing, shall open on signal if at least 24 hours notice is given.
70 District of Columbia
§ 117.253 Anacostia River.
The CSX Railroad Bridge, mile 3.4.
(a) The draw of the bridge to be operated by the controller at the Benning Yard office shall open on signal:
(1) At all times for public vessels of the United States, state and local government vessels, commercial vessels and any vessels in an emergency involving danger to life or property.
(2) Between 9 a.m. and 12 p.m. and between 1 p.m. and 6 p.m. from May 15 through September 30.
(3) Between 6 p.m. and 7 p.m. from May 15 through September 30 if notice is given to the controller at the Benning Yard office not later than 6 p.m. on the day for which the opening is requested.
(4) At all other times, if at least 48 hours of notice is given to the controller at the Benning Yard Office.
(b) The CSX Railroad Bridge shall not be operated by the controller at the Benning Yard office in the event of failure or obstruction of the motion sensors, laser scanners, video cameras or marine-radio communications, In these situations, a bridge tender must be called to operate the bridge on-site.
(c) Except as provided in § 117.31(b), opening of the draw shall not exceed ten minutes after clearance of rail traffic.
(d) A horn will sound one prolonged blast followed by one short blast to indicate that the CSX Railroad Bridge is moving to the full open position for vessel traffic. During open span movement, the channel traffic lights will flash red until the bridge is in the full open position to vessels. In the full open position to vessels, the bridge channel traffic lights will flash green.
(e) A horn will sound five short blasts, the channel traffic lights will flash red, and an audio voice-warning device will announce bridge movement during closing span movement. Five short blasts of the horn will continue until the bridge is seated in and locked down. When the bridge is seated and in locked down position to vessels, the channel traffic lights will continue to flash red.
(f) The owners of the bridge shall provide and keep in good legible condition two board gauges painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gauges shall be placed on the bridge so that they are plainly visible to the operator of any vessel approaching the bridge from either upstream or downstream.
[USCG-2025-1113, 91 FR 3034, Jan. 26, 2026]
§ 117.255 Potomac River.
(a) The draw of the Woodrow Wilson Memorial (I-95) bridge, mile 103.8, between Alexandria, Virginia, and Oxon Hill, Maryland—
(1) Shall open on signal at any time only for a vessel in distress, notwithstanding the provisions of § 117.31.
(2) Shall open for the passage of a commercial vessel at any time except:
(i) From Monday through Friday (except Federal holidays), 5 a.m. to 8 p.m.
(ii) Saturday, Sunday, and Federal holidays, 2 p.m. to 7 p.m.
(3) Need not open for the passage of a commercial vessel under paragraph (a)(2) of this section unless—
(i) The owner or operator of the vessel provides the bridge tender with an estimate of the approximate time of that passage at least 12 hours in advance at (571) 513-3745; and
(ii) the owner or operator of the vessel notifies the bridge tender at least 4 hours in advance of the requested time for that passage.
(4) Shall open for the passage of a recreational vessel at any time except:
(i) Monday through Friday (except Federal holidays), 5 a.m. to 12 midnight;
(ii) Saturday, Sunday, and Federal holidays, 7 a.m. to 12 midnight, except as provided in paragraph (a)(4)(iii) of this section;
(iii) Notwithstanding paragraph (a)(4)(ii) of this section, the bridge may open beginning at 10 p.m. on Saturday, Sunday, or a Federal holiday for the passage of a recreational vessel if the owner or operator of the vessel notifies the Bridge Tender of the time of that passage by not later than 12 hours before that time.
(5) Need not open for the passage of a recreational vessel under paragraph (a)(4) of this section unless—
(i) The owner or operator of the vessel provides the bridge tender with an estimate of the approximate time of that passage at least 12 hours in advance at (571) 513-3745; and
(ii) the owner or operator of the vessel notifies the bridge tender at least 4 hours in advance of the requested time for that passage.
(6) A recreational vessel may pass through the drawspan at any time it is open for the passage of a commercial vessel.
(b) The draws of all other bridges need not be opened for the passage of vessels.
(c) This section is also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.
[CGD 90-064, 57 FR 54178, Nov. 17, 1992, as amended byCGD05-06-083, 71 FR 51480, Aug. 30, 2006; USCG-2001-10881, 71 FR 70310, Dec. 4, 2006; 72 FR 50876, Sept. 5, 2007; USCG-2008-1216, 74 FR 31182, June 30, 2009; USCG-2024-1103, 90 FR 52877, Nov. 24, 2025]
71 Florida
§ 117.258 Apalachicola River.
(a) The draw of the Apalachicola and Northern Railroad Bridge, mile 4.5 (GIWW mile 347.0 EHL), at Apalachicola, is maintained in the fully open-to-navigation position and untended. The bridge will not be returned to service until proper notification is published in the Federal Register.
(b) The draw of the CSX Railroad Bridge, mile 105.9, at River Junction shall open on signal if at least eight hours notice is given.
[USCG-2012-0470, 77 FR 75556, Dec. 21, 2012]
§ 117.261 Atlantic Intracoastal Waterway from St. Marys River to Key Largo.
Public vessels of the United States and tugs with tows must be passed through the drawspan of each drawbridge listed in this section at any time.
(a) Bridge of Lions (SR A1A) Bridge, mile 777.9 at St. Augustine. The draw shall open on signal; except that, from 7 a.m. to 6 p.m. the draw need open only on the hour and half-hour; however, the draw need not open at 8 a.m., 12 noon, and 5 p.m. Monday through Friday except Federal holidays. From 7 a.m. to 6 p.m. on Saturdays, Sundays and Federal holidays the draw need only open on the hour and half-hour.
(b) George Musson (SR 44) Bridge, mile 845, at New Smyrna Beach. The draw shall open on signal, except that from 7 a.m. to 7 p.m., the draw shall open on the hour and half-hour, seven days a week.
(c) NASA Railroad Bridge, mile 876.6 at Titusville.
(1) The draw is not constantly tended.
(2) The draw is normally in the fully open position displaying flashing green lights to indicate that vessels may pass.
(3) When a train approaches the bridge, it stops and the operator initiates a command to lower the bridge. The lights go to flashing red and the draw lowers and locks, providing scanning equipment reveals nothing under the draw. The draw remains down until a manual raise command is initiated or will raise automatically 5 minutes after the intermediate track circuit is no longer occupied by a rail car.
(4) After the train has cleared, the draw opens and the lights return to flashing green.
[Reserved]
(e) Indiantown Road Bridge, mile 1006.2, at Jupiter. The draw shall open on the hour and half hour.
(f) Donald Ross Bridge, mile 1009.3, at North Palm Beach. The draw shall open on the hour and half-hour.
(g) PGA Boulevard Bridge, mile 1012.6, at North Palm Beach. The draw shall open on the hour and half-hour.
(h) Parker (US 1) Bridge, mile 1013.7, at Riviera Beach. The draw shall open on the quarter and three-quarter hour.
(i) Flagler Memorial (SR A1A) Bridge, mile 1021.8, at West Palm Beach.(1) The draw will open on the quarter and three-quarter hour, except Monday through Friday (except Federal holidays) from 7:30 a.m. to 9 a.m. and from 4 p.m. to 6 p.m., the draw need only open on the quarter hour.
(2) When the Presidential Security Zone is enforced, the draw will open on the quarter and three-quarter hour, except Monday through Friday (except Federal holidays) from 7:30 a.m. to 9 a.m. and from 2:15 p.m. to 6 p.m., the draw need only open on the quarter hour.
(j) Royal Park (SR 704) Bridge, mile 1022.6, at West Palm Beach. (1) The draw will open on the hour and half hour, except Monday through Friday (except Federal holidays) from 7:30 a.m. to 9 a.m. and from 4 p.m. to 6 p.m., the draw need only open on the half hour.
(2) When the Presidential Security Zone is enforced, the draw will open on the hour and half hour, except Monday through Friday (except Federal holidays) from 7:30 a.m. to 9 a.m. and from 2:15 p.m. to 6 p.m., the draw need only open on the half hour.
(k) Southern Boulevard (SR 80) Bridge, mile 1024.7, at West Palm Beach. (1) The draw will open on the quarter and three-quarter hour, except Monday through Friday (except Federal holidays) from 7:30 a.m. to 9 a.m. and from 4 p.m. to 6 p.m., the draw need only open on the quarter hour.
(2) When the Presidential Security Zone is enforced, the draw may be closed without advance notice to permit uninterrupted transit of dignitaries across the bridge. At all other times the bridge shall open on the quarter and three-quarter hour, or as directed by the on-scene designated representative.
(l) East Ocean Avenue Bridge, mile 1031.0, at Lantana. The draw shall open on the hour and half-hour.
(m) Ocean Avenue Bridge, mile 1035.0, at Boynton Beach. The draw shall open on the hour and half-hour.
(n) East Atlantic Avenue (SR 806) Bridge, mile 1039.6, at Delray Beach. The draw shall open on the quarter and three-quarter-hour.
(o) Linton Boulevard Bridge, mile 1041.1, at Delray Beach. The draw shall open on the hour and half-hour.
(p) Spanish River Boulevard Bridge, mile 1044.9, at Boca Raton. The draw shall open on the hour and half-hour.
(q) East Palmetto Park Road Bridge, mile 1047.5, at Boca Raton. The draw shall open on the hour and half-hour.
(r) East Camino Real Bridge, mile 1048.2, at Boca Raton. The draw shall open on the hour, twenty minutes past the hour and forty minutes past the hour.
(s) East Hillsboro Boulevard Bridge (SR 810), mile 1050.0 at Deerfield Beach. The draw shall open on the hour and half-hour.
(t) Northeast 14th Street Bridge, mile 1055.0 at Pompano Beach. The draw shall open on the quarter-hour and three-quarter hour.
(u) East Atlantic Boulevard (SR 814) Bridge, mile 1056.0 at Pompano Beach. The draw shall open on the hour and half-hour.
(v) East Commercial Boulevard (SR 870) Bridge, mile 1059.0, at Lauderdale-by-the-Sea. The draw shall open on the hour and half-hour.
(w) East Oakland Park Boulevard Bridge, mile 1060.5 at Fort Lauderdale. The draw shall open on the quarter-hour and three-quarter hour.
(x) East Sunrise Boulevard (SR 838) Bridge, mile 1062.6, at Fort Lauderdale. The draw shall open on the hour and half-hour. On the first weekend in May, the draw need not open from 4 p.m. to 6 p.m. on Saturday and Sunday, and, on the first Saturday in May, the draw need not open from 9:45 p.m. to 10:45 p.m.
(y) East Las Olas Bridge, mile 1064 at Fort Lauderdale. The draw shall open on the quarter-hour and three-quarter hour. On the first weekend in May, the draw need not open from 4 p.m. to 6 p.m. on Saturday and Sunday, and, on the first Saturday in May, the draw need not open from 9:45 p.m. to 10:45 p.m.
(z) Southeast 17th Street (Brooks Memorial) Bridge, mile 1065.9 at Fort Lauderdale. The draw shall open on the hour and half-hour; except that from 6:50 a.m. to 9:10 a.m. and from 3:50 p.m. to 6:10 p.m., Monday through Friday, except Federal holidays, the drawbridge shall open once an hour at the top of the hour.
(aa) Dania Beach Boulevard Bridge, mile 1069.4 at Hollywood. The draw shall open on the hour and half-hour.
(bb) Sheridan Street Bridge, mile 1070.5, at Hollywood. The draw shall open on the quarter-hour and three-quarter hour.
(cc) Hollywood Beach Boulevard (SR 820) Bridge, mile 1072.2 at Hollywood. The draw shall open on the hour and half-hour.
(dd) Hallandale Beach Boulevard (SR 824) Bridge, mile 1074.0 at Hallandale Beach. The draw shall open on the quarter-hour and three-quarter hour.
(ee) N.E. 163rd Street (SR 826) Bridge, mile 1078.0 at Sunny Isles Beach. The draw shall open on signal; except that, from 7 a.m. to 6 p.m. on Monday through Friday except Federal holidays, and from 10 a.m. to 6 p.m. on Saturdays, Sundays, and Federal holidays, the draw need open only on the quarter-hour and three-quarter hour.
(ff) Broad Causeway Bridge, mile 1081.4 at Bay Harbor Islands. The draw shall open on signal; except that, from 8 a.m. to 6 p.m., the draw need open only on the quarter-hour and three-quarter hour.
(gg) West 79th Street Bridge, mile 1084.6, at Miami. The draw shall operate as follows:
(1) Monday through Friday (except on Federal holidays):
(i) 7 a.m. to 10 a.m. the draw need only open on the hour.
(ii) 10 a.m. to 4 p.m. the draw need only open on the hour and half hour.
(iii) 4 p.m. to 7 p.m. the draw need only open on the hour.
(iv) 7 p.m. to 7 a.m. the draw shall open on signal.
(2) Saturday, Sunday, and Federal holidays the draw shall open on signal.
(hh) West Venetian Causeway Bridge, mile 1088.6, at Miami. The draw shall open on signal, except that from 7 a.m. to 7 p.m. daily, including Federal holidays, the draw need only open on the hour and half hour.
[CGD7-84-29, 50 FR 51248, Dec. 16, 1985]
Editorial Note:For Federal Register citations affecting § 117.261, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.263 Banana River.
(a) The draw of the Mathers (SR A-1-A) Bridge, mile 0.5 at Indian Harbor Beach, shall open on signal; except that, from 10 p.m. to 6 a.m. Monday through Friday except Federal holidays, the draw shall open on signal if at least two hours notice is given.
(b) The draw of the NASA Causeway bridge, mile 27.6 at Cape Canaveral, shall open on signal if at least four hours notice is given to the NASA Security Office by telephone or in person.
[CGD 82-025, 49 FR 26721, June 29, 1984]
§ 117.268 Billy's Creek.
The draw of the State Road 80 bridge at Fort Myers need not be opened for the passage of vessels; however, the draw shall be restored to operable condition within 6 months after notification by the District Commander to do so.
[CGD 07-98-009, 63 FR 67402, Dec. 7, 1998]
§ 117.269 Biscayne Bay.
The Venetian Causeway Bridge (East), across Miami Beach Channel. The draw shall open on signal, except that from 7 a.m. to 7 p.m. daily, including Federal holidays, the draw need only open on the hour and half hour.
[USCG-2017-0068, 83 FR 16778, Apr. 17, 2018]
§ 117.271 Blackwater River.
The draw of the CSX Transportation Railroad bridge, mile 2.8 at Milton, shall open on signal; except that, from 8 p.m. to 4 a.m., the draw shall open on signal if at least eight hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD8-86-06, 51 FR 29101, Aug. 14, 1986; USCG-2001-10881, 71 FR 70310, Dec. 4, 2006]
§ 117.273 Canaveral Barge Canal.
(a) The drawspan of the Christa McAuliffe Drawbridge, SR 3, mile 1.0, across the Canaveral Barge Canal need only open daily for vessel traffic on the hour and half-hour from 6 a.m. to 10 p.m.; except that from 6:15 a.m. to 8:15 a.m. and from 3:10 p.m. to 5:59 p.m., Monday through Friday, except Federal holidays, the drawspan need not open. From 10:01 p.m. to 5:59 a.m., everyday, the drawspan must open on signal if at least 3 hours notice is given to the drawtender. The drawspan must open as soon as possible for the passage of public vessels of the United States and tugs with tows.
(b) The drawspans of the SR401 Drawbridges, mile 5.5 at Port Canaveral, must open on signal; except that, from 6:30 a.m. to 8 a.m. and 3:30 p.m. to 5:15 p.m. Monday through Friday except Federal holidays and from 11 a.m. to 2 p.m. on Saturdays and Sundays, the drawspans need not be opened for the passage of vessels. From 10 p.m. to 6 a.m., the drawspans must open on signal if at least three hours notice is given. The drawspans must open as soon as possible for the passage of public vessels of the United States and tugs with tows.
[USCG-2001-10881, 71 FR 70310, Dec. 4, 2006, as amended by USCG-2017-0161, 83 FR 4430, Jan. 31, 2018; USCG-2025-0780, 90 FR 47233, Oct. 1, 2025]
§ 117.279 Coffeepot Bayou.
The draw of the Snell Isle Boulevard bridge, mile 0.4 at St. Petersburg, need not be opened for the passage of vessels.
§ 117.283 Dunns Creek.
The draw of the US17 bridge, mile 0.9 near Satsuma, shall open on signal if at least three hours notice is given.
§ 117.285 Grand Canal.
(a) The draw of the Lansing Island Bridge, mile 0.7, at Indian Harbour Beach, shall open on signal, except that from 10 p.m. to 6 a.m., daily, the draw need not open for the passage of vessels and will be untended.
(b) The draw of the Tortoise Island bridge, mile 2.6, shall open on signal; except that from 10 p.m. to 6 a.m. from Sunday evening through Friday morning, the draw shall open on signal if at least 2 hours advance notice is given. From 10 p.m. to 6 a.m. on Friday and Saturday and on evenings immediately preceding Federal holidays, the draw shall open on signal if at least 30 minutes advance notice is given.
[CGD7-92-113, 58 FR 31474, June 3, 1993, as amended by CGD07-98-048, 64 FR 30391, June 8, 1999; USCG-2022-0015, 87 FR 49992, Aug. 15, 2022]
§ 117.287 Gulf Intracoastal Waterway.
Public vessels of the United States and tugs with tows must be passed through the drawspan of each drawbridge listed in this section at any time.
(a) The Boca Grande Swing Bridge, mile 34.3, at Placida, Florida shall open on signal; except that, from 7 a.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw need only open on the hour and half hour. On Saturday, Sunday and Federal holidays, from 7 a.m. to 6 p.m., the draw need only open on the hour, quarter hour, half hour and three-quarter hour.
(b) The Venice Avenue Bridge, mile 56.6, at Venice, Florida shall open on signal, except that from 7 a.m. to 4:30 p.m., Monday through Friday except Federal holidays, the draw need only open at 10 minutes after the hour, 30 minutes after the hour and 50 minutes after the hour and except between 4:35 p.m. and 5:35 p.m. when the draw need not open.
(c) The Hatchett Creek (US-41) Bridge, mile 56.9, at Venice, Florida shall open on signal, except that, from 7 a.m. to 4:20 p.m., Monday through Friday except Federal holidays, the draw need only open on the hour, 20 minutes after the hour, and 40 minutes after the hour and except between 4:25 p.m. and 5:25 p.m. when the draw need not open. On Saturdays, Sundays, and Federal holidays from 7:30 a.m. to 6 p.m. the draw need only open on the hour, quarter-hour, half-hour, and three-quarter hour. This bridge need not open to navigation on the second Sunday of November annually, from 9 a.m. to 5 p.m., to facilitate the Iron Man Triathlon event.
(d) The Blackburn Point Bridge, mile 63.1, at Osprey, Florida shall open on signal; except that from 7 a.m. to 7 p.m., Monday through Friday, except Federal holidays, the draw need only open on the hour, 20 minutes after the hour, and 40 minutes after the hour.
(e) The Stickney Point Bridge, mile 68.6, at South Sarasota, Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, the draw need only open on the hour and half hour.
(f) The Siesta Drive Bridge, mile 71.6, at Sarasota, Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, the draw need only open on the hour and half hour.
(g) The Cortez (SR 684) Bridge, mile 87.4, at Bradenton Beach, Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, the draw need only open on the quarter hour and three-quarter hour.
(h) The Anna Maria (SR 64) (Manatee Avenue West) Bridge, mile 89.2, at Bradenton Beach, Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, the draw need only open on the quarter hour and three-quarter hour.
(i) The Corey Causeway (SR693) Bridge, mile 117.7, at South Pasadena, Florida shall open on signal; except that, from 8 a.m. to 7 p.m. Monday through Friday, and 10 a.m. to 7 p.m. Saturdays, Sundays, and Federal holidays, the draw need only open on the hour, 20 minutes after the hour, and 40 minutes after the hour.
(j) The Treasure Island Causeway Bridge, mile 119.0, at Treasure Island, Florida shall open on signal except that from 7 a.m. to 7 p.m. the draw need only open on the hour, 20 minutes after the hour and 40 minutes after the hour Monday through Friday and on the quarter hour and three-quarter hour on Saturday, Sunday and Federal holidays.
(k) The Welch Causeway (SR 699) Bridge, mile 122.8, at Madeira Beach, Florida, shall open on signal; except that, from 7 a.m. to 7 p.m. daily, except Federal holidays, the draw need only open on the hour and half hour.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984]
Editorial Note:For Federal Register citations affecting § 117.287, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.289 Hillsboro Inlet.
The drawspans of the SR A-1-A Drawbridge, mile 0.3 at Hillsboro Beach, must open on signal; except that, from 7 a.m. to 6 p.m., the drawspans need be opened only on the hour, quarter hour, half hour, and three quarter hour. Public vessels of the United States and tugs with tows must be passed at anytime.
[USCG-2001-10881, 71 FR 70310, Dec. 4, 2006]
§ 117.291 Hillsborough River.
(a) The drawspans for the drawbridges at Platt Street, mile 0.0, Brorein Street, mile 0.16, Kennedy Boulevard, mile 0.4, Cass Street, mile 0.7, Laurel Street, mile 1.0, West Columbus Drive, mile 2.3, and West Hillsborough Avenue, mile 4.8, must open on signal if at least two hours notice is given; except that, the drawspan must open on signal as soon as possible for public vessels of the United States.
(b) The draw of the CSX Railroad Bridge across the Hillsborough River, mile 0.7, at Tampa, operates as follows:
(1) The bridge is not tended.
(2) The draw is normally in the fully open position, displaying green lights to indicate that vessels may pass.
(3) As a train approaches, provided the marine traffic detection laser scanners do not detect a vessel under the draw, the lights change to flashing red and a horn continuously sounds while the draw closes. The draw remains closed until the train passes.
(4) After the train clears the bridge, the lights continue to flash red and the horn again continuously sounds while the draw opens, until the draw is fully open and the lights return to green.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984, as amended by CGD7-92-56, 58 FR 15420, Mar. 23, 1993; CGD07-04-148, 70 FR 43766, July 29, 2005; USCG-2001-10881, 71 FR 70310, Dec. 4, 2006]
§ 117.293 Indian Creek.
The draw of the 63rd Street Bridge across Indian Creek, mile 4.0 at Miami Beach, FL, shall open on signal except that:
(a) Each day from 7 a.m. to 7 p.m., except Federal holidays, the draw need open only on the hour and half-hour;
(b) From 7:10 a.m. to 9:55 a.m. and 4:05 p.m. to 6:59 p.m., Monday through Friday except Federal holidays, the draw need not open for the passage of vessels.
(c) In February of each year during the period seven days prior to the City of Miami Beach Yacht and Brokerage Show and the four days following the show, from 10 a.m. to 4 p.m., the bridge need not open except for 10 minutes at the top of the hour. At all other times the bridge shall operate on its normal schedule.
[USCG-2015-0940, 81 FR 36800, June 8, 2016, as amended by USCG-2020-0658, 87 FR 16987, Mar. 25, 2022]
§ 117.297 Little Manatee River.
The draw for the CSX Railroad Bridge, mile 2.4 near Ruskin, FL, shall operate as follows:
(a) The bridge is normally maintained in the closed position.
(b) The bridge is not tendered locally, but will be monitored and operated by a remote bridge tender.
(c) Marine radio communication shall be maintained, by the remote bridge tender, with mariners near the bridge for the safety of navigation. Visual monitoring of the waterway shall be maintained with the use of cameras. Detection sensors shall be installed for the detection of vessels within the radius of the swing span of the bridge.
(d) The draw must open on signal if at least three hours advance notice is requested via marine radio channel 9 VHF or telephone (813) 677-3974.
(e) The bridge shall not be operated from the remote location in the following events: Failure or obstruction of the detection sensors, cameras, or marine radio communications. In these situations, a bridge tender must be on-site and locally operate the bridge.
[USCG-2020-0573, 86 FR 15411, Mar. 23, 2021]
§ 117.299 Loxahatchee River.
The draw of the Florida East Coast Railway bridge across the Loxahatchee River, mile 1.2 at Jupiter, operates as follows:
(a) The bridge is not constantly tended.
(b) The draw is normally in the fully open position, displaying flashing green lights to indicate that vessels may pass.
(c) When a train approaches, the lights go to flashing red and a horn starts four blasts, pauses, and then continues four blasts. After an eight minute delay, the draw lowers and locks, providing the scanning equipment reveals nothing under the draw. The draw remains down for a period of eight minutes or while the approach track circuit is occupied.
(d) After the train has cleared, the draw opens and the lights return to flashing green.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984; Redesignated by CGD07-04-015, 69 FR 42874, July 19, 2004]
§ 117.300 Manatee River.
The draw of the CSX Railroad Bridge across the Manatee River, mile 4.5 Bradenton, operates as follows:
(a) The bridge is not tended.
(b) The draw is normally in the fully open position, displaying green lights to indicate that vessels may pass.
(c) As a train approaches, provided the scanners do not detect a vessel under the draw, the lights change to flashing red and a horn continuously sounds while the draw closes. The draw remains closed until the train passes.
(d) After the train clears the bridge, the lights continue to flash red and the horn again continuously sounds while the draw opens, until the draw is fully open and the lights return to green.
[CGD07-04-015, 69 FR 42874, July 19, 2004]
§ 117.301 Massalina Bayou.
The draw of the Tarpon Dock bascule span bridge, Massalina Bayou, mile 0.0 at Panama City, shall open on signal; except that from 9 p.m. until 11 p.m. on July 4, each year, the draw need not open for the passage of vessels. The draw will open at any time for a vessel in distress.
[66 FR 36467, July 12, 2001]
§ 117.303 Matlacha Pass.
The draw of the SR78 bridge, mile 6.0 at Fort Myers, shall open on signal from 8 a.m. to 10 a.m. and from 3 p.m. to 7 p.m. Monday through Saturday. On Sundays the draw shall open on signal from 7 a.m. to 10 a.m. and from 3 p.m. to 7 p.m. At all other times, the draw need not be opened for the passage of vessels.
[CGD7-92-74, 57 FR 58711, Dec. 11, 1992]
§ 117.304 Miami Beach Channel.
The draw of the East 79th Street Bridge, mile 2.20, at Miami Beach, Florida. The draw shall operate as follows:
(a) Monday through Friday (except on Federal holidays):
(1) 7 a.m. to 10 a.m. the draw need only open on the hour.
(2) 10 a.m. to 4 p.m. the draw need only open on the hour and half hour.
(3) 4 p.m. to 7 p.m. the draw need only open on the hour.
(4) 7 p.m. to 7 a.m. the draw shall open on signal.
(b) Saturday, Sunday, and Federal holidays the draw shall open on signal.
[USCG-2022-0371, 88 FR 30233, May 11, 2023]
§ 117.305 Miami River.
(a) General. Public vessels of the United States, tugs, tugs with tows, and vessels in a situation where a delay would endanger life or property shall, upon proper signal, be passed through the draw of each bridge listed in this section at any time.
(b) The draws of the S.W. First Street Bridge, mile 0.9, up to and including the N.W. 27th Avenue Bridge, mile 3.7 at Miami, shall open on signal; except that, from 7:35 a.m. to 8:59 a.m. and 4:45 p.m. to 5:59 p.m., Monday through Friday, except Federal holidays, the draws need not open for the passage of vessels.
(c) The draws of the Miami Avenue Bridge, mile 0.3, and the S.W. Second Avenue Bridge, mile 0.5, at Miami, shall open on signal; except that, from 7:35 a.m. to 8:59 a.m., 12:05 p.m. to 12:59 p.m. and 4:35 p.m. to 5:59 p.m., Monday through Friday, except Federal holidays, the draws need not open for the passage of vessels.
(d) The draw of the Brickell Avenue Bridge, mile 0.1, at Miami, shall open on signal; except that, from 7 a.m. to 7 p.m., Monday through Friday except Federal holidays, the draw need open only on the hour and half-hour. From 7:35 a.m. to 8:59 a.m., 12:05 p.m. to 12:59 p.m. and 4:35 p.m. to 5:59 p.m., Monday through Friday except Federal holidays, the draw need not open for the passage of vessels.
[CGD07-03-118, 69 FR 7688, Feb. 19, 2004]
§ 117.307 Miami River, North Fork.
The draw of the FDOT Railroad Bridge, mile 5.3 at Miami, shall open on signal if at least 48-hour notice is given to CSX System Operating Headquarters (800) 232-0144.
[CGD07-03-088, 69 FR 9549, Mar. 1, 2004]
Effective Date Note:At 90 FR 14730, Apr. 4, 2025, § 117.307 was stayed, effective Apr. 4, 2025, through Dec. 31, 2027.
§ 117.307T Miami River, North Fork.
The draw of the Florida Department of Transportation (FDOT) Railroad Bridge, mile 5.3 at Miami, Florida need not open to navigation.
Effective Date Note:At 90 FR 14730, Apr. 4, 2025, § 117.307T was added, effective Apr. 4, 2025, through Dec. 31, 2027.
§ 117.311 New Pass.
The drawspan for the State Road 789 Drawbridge, mile 0.05, at Sarasota, need only open on the hour, twenty minutes past the hour, and forty minutes past the hour from 7 a.m. to 6 p.m. From 6 p.m. to 7 a.m., the drawspan must open on signal if at least 3 hours notice is given to the drawtender. Public vessels of the United States and tugs with tows must be passed at anytime.
[USCG-2001-10881, 71 FR 70310, Dec. 4, 2006]
§ 117.313 New River.
(a) The draw of the SE. Third Avenue bridge, mile 1.4 at Fort Lauderdale shall open on signal; except that, from 7:30 a.m. to 9 a.m. and 4:30 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw need not open. Public vessels of the United States, tugs with tows, and vessels in distress shall be passed at any time.
(b) The draw of the Andrews Avenue bridge, mile 2.3 at Fort Lauderdale, shall open on signal; except that, from 7:30 a.m. to 9 a.m. and 4:30 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw need not open. The draw need not open for inbound vessels when the draw of the Florida East Coast Railroad bridge, mile 2.5 at Fort Lauderdale is in the closed position for the passage of a train. Public vessels of the United States, tugs with tows, and vessels in distress shall be passed at any time.
(c) The draw of the Florida East Coast (FEC) Railroad Bridge across the New River, mile 2.5, at Fort Lauderdale shall operate as follows:
(1) The drawbridge shall be maintained in the fully open-to-navigation position for vessels at all times, except during periods when it is closed for the passage of rail traffic, inspections, and to perform periodic maintenance authorized in accordance with subpart A of this part.
(2) The drawbridge shall not be closed to navigation for more than 60 consecutive minutes.
(3) Notwithstanding paragraph (c)(1) of this section, the drawbridge shall open and remain open to navigation for a fixed 10-minute period each hour from 5 a.m. to 11:59 p.m., except that the drawbridge shall be open at the following times which shall serve as the hourly fixed 10-minute period:
Table 1 to Paragraph (c)(3)
7:00 a.m. until 7:10 a.m.
9:00 a.m. until 9:10 a.m.
4:00 p.m. until 4:10 p.m.
6:00 p.m. until 6:10 p.m.
10:00 p.m. until 10:10 p.m.
(i) Additionally, in each hour from 12:00 p.m. to 2:59 p.m., the drawbridge shall open and remain open to navigation for an additional 10-minute period.
(ii) The 10-minute opening periods shall be published on a quarterly basis by the drawbridge owner and reflected on the drawbridge owner's website and mobile application.
(4) The drawbridge shall have a drawbridge tender onsite at all times who is capable of physically tending and operating the drawbridge by local control, if necessary, or when ordered by the Coast Guard.
(i) The drawbridge tender shall provide estimated times of drawbridge openings and closures, upon request.
(ii) Operational information will be provided 24 hours a day on VHF-FM channels 9 and 16 or by telephone at (305) 889-5572. Signs shall be posted visible to marine traffic and displaying VHF radio contact information, website and application information, and the telephone number for the bridge tender.
(5) In the event of a drawbridge operational failure, or other emergency circumstances impacting normal drawbridge operations, the drawbridge owner shall immediately notify the Coast Guard Captain of the Port Miami and provide an estimated time of repair and return to normal operations.
(6) A drawbridge log shall be maintained including drawbridge opening and closing times. The drawbridge log should include reasons for those drawbridge closings that interfere with scheduled openings in this section. This drawbridge log shall be maintained by the drawbridge owner and upon request, be provided to the Coast Guard.
(7) A website and mobile application shall be maintained by the drawbridge owner and publish:
(i) Drawbridge opening times required by this paragraph (c);
(ii) Timely updates to schedules; including but not limited to impacts due to emergency circumstances, repairs, and inspections;
(iii) At least 24-hour advance notice for each schedule in order to facilitate planning by maritime operators; and
(iv) To the extent reasonably practicable, at least 60-minutes advance notice of schedule changes or delays.
(8) The drawbridge shall display the following lights:
(i) When the drawbridge is in the fully open position, green lights shall be displayed to indicate that vessels may pass.
(ii) When rail traffic approaches the block signal, the lights shall go to flashing red, then the drawbridge lowers and locks, and the lights shall remain flashing red.
(iii) After the rail traffic has cleared the drawbridge, the drawbridge shall open and the lights return to green.
(d) [Reserved]
(e) The draw of the Marshal (Seventh Avenue) bridge, mile 2.7 at Fort Lauderdale shall open on signal; except that, from 7:30 a.m. to 9 a.m. and 4:30 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw need not open. Public vessels of the United States, tugs with tows, and vessels in distress shall be passed at any time.
[CGD07-06-019, 71 FR 65413, Nov. 8, 2006, as amended by USCG-2001-10881, 72 FR 7351, Feb. 15, 2007; USCG-2015-0271, 81 FR 65547, Sept. 23, 2016; USCG-2019-0955, 86 FR 58800, Oct. 25, 2021]
§ 117.315 New River, South Fork.
(a) The draw of the Davie Boulevard (SW. Twelfth Street) bridge, mile 0.9 at Fort Lauderdale shall open on signal; except that, from 7:30 a.m. to 9 a.m. and 4:30 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw need not open. Public vessels of the United States, tugs with tows, and vessels in distress shall be passed at any time.
(b) The drawspan for the SR84 Drawbridge, mile 4.4 at Fort Lauderdale, must open on signal if at least 24 hours notice is given. Public vessels of the United States and tugs with tows must be passed through the draw as soon as possible.
[USCG-2001-10881, 71 FR 70310, Dec. 4, 2006; 72 FR 7351, Feb. 15, 2007]
§ 117.317 Okeechobee Waterway.
(a) Exempt vessels. This term means public vessels of the United States and tugs with tows.
(b) Florida East Coast Railroad (FEC) Bridge, mile 7.41, at Stuart. The draw shall operate as follows:
(1) The drawbridge will be maintained in the fully open-to-navigation position, except during periods when it is closed for the passage of train traffic, to conduct inspections, and to perform maintenance and repairs authorized by the Coast Guard.
(2) The drawbridge will not be closed for more than 50 consecutive minutes in any given hour during daytime operations (6 a.m. to 8 p.m.) and for more than 7 total hours during daytime operations (6 a.m. to 8 p.m.).
(3) Notwithstanding paragraph (c)(1) of this section, the drawbridge will open and remain open to navigation for a fixed 10-minute period at the top of each hour from 6 a.m. to 8 p.m.
(4) From 8:01 p.m. until 5:59 a.m. daily, the drawbridge will remain in the fully open-to-navigation position, except during periods when it is closed for the passage of train traffic, to conduct inspections, and to perform maintenance and repairs authorized by the Coast Guard. The drawbridge will not be closed more than 60 consecutive minutes during this time frame.
(5) If a train is in the track circuit at the start of a fixed opening period, the opening may be delayed up to, but not more than, five minutes. Once the train has cleared the circuit, the bridge must open immediately for navigation to begin the fixed opening period.
(6) The drawbridge will be tended from 6 a.m. to 8 p.m., daily. The bridge tender will monitor VHF-FM channels 9 and 16 and will provide estimated times of drawbridge openings and closures, or any operational information requested. Operational information will be provided 24 hours a day by telephone at (305) 889-5576.
(7) The drawbridge owner will maintain a mobile application. The drawbridge owner will publish drawbridge opening times, and the drawbridge owner will provide timely updates to schedules, including but not limited to, impacts due to emergency circumstances, inspections, maintenance, and repairs authorized by the Coast Guard.
(8) Signs will be posted and visible to marine traffic, displaying VHF radio contact information, application information, and the telephone number for the bridge tender.
(c) The SR 707 (Dixie Highway) Bridge, mile 7.5 at Stuart, shall open on signal; except when the adjacent railroad bridge is in the closed position, the draw need not open. The draw must open immediately upon opening of the railroad bridge to pass all accumulated vessels requesting an opening.
(d) Seaboard System Railroad bridge, mile 28.2 at Indiantown. The draw of the CSX Railroad Bridge, mile 28.2 at Indiantown, FL, shall operate as follows:
(1) The swing bridge is not tendered locally, but will be monitored and operated by a remote operator.
(2) Marine radio communication shall be maintained, by the remote operator, with mariners near the bridge for the safety of navigation. Visual monitoring of the waterway shall be maintained with the use of cameras. Detection sensors shall be installed for the detection of vessels entering the radius of the swing span of the bridge while in operation.
(3) From 7 a.m. to 7 p.m., the bridge will be maintained in the open to navigation position and will display green lights to indicate that the span is fully open.
(4) When a train approaches, the remote operator shall monitor for vessels in the vicinity of the bridge. Provided the sensors do not detect a vessel entering the swing radius of the bridge, the operator shall initiate the closing sequence, which includes the sounding of a horn. The span will remain in the closed position for the entire time the track circuit is occupied displaying red lights.
(5) After the train has cleared the track circuit, the span shall open and green lights will be displayed.
(6) From 7 p.m. to 7 a.m., the bridge will be in the closed to navigation position and will open if at least a three hour advance notice is requested via marine radio channel 9 VHF or telephone (813) 677-3974.
(7) The bridge shall not be operated from the remote location in the following events: Failure or obstruction of the detection sensors, remote actuation systems, cameras, or marine radio communications, or when directed by the Coast Guard. In these situations, a bridge operator must be on-site and locally operate the bridge.
(e) Florida East Coast Railroad bridge, mile 38.0, at Port Mayaca.
(1) The bridge is not constantly tended.
(2) The draw is normally in the fully open position displaying flashing green lights to indicate that vessels may pass.
(3) When a train approaches the bridge it will stop and a crewmember will observe the waterway for approaching vessels, which will be allowed to pass. Upon manual signal, the bridge lights will go to flashing red, and the horn will sound four blasts, pause, then repeat four blasts, then the draw will lower and lock, providing scanning equipment reveals nothing under the span.
(4) After the train has cleared, the draw will open, and the lights will return to flashing green.
(f) Belle Glade Dike (SR 71) bridge, mile 60.7 between Torry Island and Lake Shore. The draw shall open on signal from 7 a.m. to 6 p.m. Monday through Thursday, and from 7 a.m. to 7 p.m. Friday through Sunday. At all other times, the draw need not be opened for the passage of vessels.
(g) Seaboard System Railroad bridge, mile 78.3 at Moore Haven. The draw shall open on signal; except that, from 10 p.m. to 6 a.m. the draw need not be opened for the passage of vessels.
(h) Highway bridges at Moore Haven (mile 78.4) La Belle (mile 103.0), Denaud (mile 108.2), Alva (mile 116.0), and Olga (mile 126.3). The draws shall open on signal; except that, from 10 p.m. to 6 a.m. the draws shall open on signal if at least three hours notice is given.
(i) Caloosahatchee River Bridge (SR 29), Mile 103, Labelle, Florida. The Caloosahatchee River bridge (SR 29), mile 103, shall open on signal, except that from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the bridge need not open. Exempt vessels shall be passed at any time.
[CGD7 85-50, 51 FR 12319, Apr. 10, 1986]
Editorial Note:For Federal Register citations affecting § 117.317, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.319 Oklawaha River.
(a) The draw of the Sharpes Ferry (SR 40) bridge, mile 55.1 shall open on signal if at least three hours notice is given.
(b) The draw of the Moss Bluff (SR 464) bridge, mile 66.0, need not open for the passage of vessels.
(c) The draw of the Muclan Farms bridge, mile 63.9, need not open for the passage of vessels.
[CGD7-85-15, 50 FR 29672, July 22, 1985, as amended by CGD7-87-49, 52 FR 42649, Nov. 6, 1987; CGD07-02-008, 67 FR 50351, Aug. 2, 2002]
§ 117.323 Outer Clam Bay.
The drawspan of the Outer Clam Bay Boardwalk Drawbridge shall open on signal if at least 30 minutes advance notice is given.
[CGD07-06-237, 72 FR 11777, Mar. 14, 2007]
§ 117.324 Rice Creek.
The CSX Railroad Swing Bridge, mile 0.8, in Putnam County, FL. shall open with a 24-hour advance notice to CSX at 1-800-232-0142.
[USCG-2016-0523, 82 FR 41891, Sept. 5, 2017]
§ 117.325 St. Johns River.
(a) The drawspan for the Main Street (1/SR 90) drawbridge, mile 24.7, at Jacksonville, must open on signal except that, from 7 a.m. to 8:30 a.m. and from 4:30 p.m. to 6 p.m., Monday through Saturday except Federal holidays, the drawspan need not be opened for the passage of vessels.
(b) The draw of the Florida East Coast automated railroad bridge, mile 24.9, shall operate as follows:
(1) The bridge shall be constantly tended and have a mechanical override capability for the automated operation. A radiotelephone shall be maintained at the bridge for the safety of navigation.
(2) The draw is normally in the fully open position, displaying flashing green lights to indicate that vessels may pass.
(3) When a train approaches, large signs on both the upstream and downstream sides of the bridge flash “Bridge Coming Down,” the lights go to flashing red, and siren signals sound. After an eight minute delay, the draw lowers and locks if there are no vessels under the draw. The draw remains down for a period of eight minutes or while the approach track circuit is occupied.
(4) After the train has cleared, the draw opens and the lights return to flashing green.
(c) The draw for the Buffalo Bluff CSX automated Railroad Bridge, St. Johns River, mile 94.5 at Satsuma, Putnam County, FL shall operate as follows:
(1) The bridge is not tendered locally, but will be operated and monitored by a remote tender.
(2) The bridge shall have local and mechanical override capabilities over the remote operation.
(3) Marine radio communication shall be maintained with mariners near the bridge for the safety of navigation. Visual monitoring of the waterway shall be maintained with the use of cameras and the detection of vessels under the span shall be accomplished with detection sensors.
(4) The span is normally in the fully open position and will display green lights to indicate that the span is fully open.
(5) When a train approaches, the remote tender shall monitor for vessels approaching the bridge. The remote tender shall warn approaching vessels via marine radio, channel 9 VHF of a bridge lowering. The remote tender may also be contacted via telephone at (386) 649-8538.
(6) Provided the sensors do not detect a vessel under the span, the tender shall initiate the span lowering sequence, which includes the sounding of a horn and the displaying of red lights. The span will remain in the down position for a minimum of eight minutes or for the entire time the approach track circuit is occupied.
(7) After the train has cleared the bridge track circuit, the span shall open and the green lights will be displayed.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD7-90-76, 55 FR 47753, Nov. 15, 1990; CGD07-96-069, 62 FR 15843, Apr. 3, 1997; CGD07-05-009, 70 FR 18991, Apr. 12, 2005; USCG-2001-10881, 71 FR 70310, Dec. 4, 2006; USCG-2012-0306, 77 FR 37314, June 21, 2012; USCG-2017-0857, 84 FR 29065, June 21, 2019]
§ 117.329 St. Marys River.
The draws of US17 bridge, mile 23.0, and the Seaboard System Railroad bridge, mile 23.1, both at Kingsland, shall open on signal if at least 48 hours notice is given.
§ 117.331 Snake Creek.
The draw of the Snake Creek Bridge, at Islamorada, Florida, will open on signal, except that from 7 a.m. to 6 p.m., the draw need open only on the hour.
[USCG-2015-0046, 81 FR 28728, May 10, 2016]
§ 117.335 Taylor Creek.
The draw of US441 bridge, mile 0.3 at Okeechobee, shall open on signal if at least two hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984]
§ 117.337 Trout River.
The draw of the CSX Railroad Bridge across the Trout River, mile 0.9 at Jacksonville, operates as follows:
(a) The bridge is not tended.
(b) The draw is normally in the fully open position, displaying green lights to indicate that vessels may pass.
(c) As a train approaches, provided the scanners do not detect a vessel under the draw, the lights change to flashing red and a horn continuously sounds while the draw closes. The draw remains closed until the train passes.
(d) After the train clears the bridge, the lights continue to flash red and the horn again continuously sounds while the draw opens, until the draw is fully open and the lights return to green.
[USCG-2009-0249, 75 FR 24402, May 5, 2010]
§ 117.341 Whitcomb Bayou.
The draw of the Beckett Bridge, mile 0.5, at Tarpon Springs, Florida shall open on signal if at least two hours notice is given.
[CGD7-87-60, 53 FR 3206, Feb. 4, 1988]
72 Georgia
§ 117.351 Altamaha River.
(a) The draws of all bridges, except the Seaboard System Railroad bridge, mile 59.4 at Doctortown, shall open on signal if at least 24 hours notice is given.
(b) The draw of the Seaboard System Railroad bridge, mile 59.4 at Doctortown, shall open on signal if at least seven days notice is given.
§ 117.359 Chattahoochee River.
See § 117.107, Chattahoochee River, listed under Alabama.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
§ 117.361 Flint River.
The draws of the CSX Transportation Railroad bridges, miles 28.0 and 28.7, both at Bainbridge, shall open on signal if at least 15 days notice is given.
§ 117.363 Ocmulgee River.
The draws of each bridge shall open on signal if at least 24 hours notice is given.
§ 117.371 Savannah River.
(a) The draw of the CSX Transportation Railroad Bridge, mile 27.4 near Hardeeville, South Carolina, shall open if at least a 24-hour advance notice is given. Openings can be arranged by contacting CSX Transportation at 1-800-232-0144.
(b) [Reserved]
(c) The draw of the Seaboard System Railroad bridge, mile 195.4 near Augusta, shall open on signal if at least three hours notice is given.
[CGD7-84-21, 49 FR 43955, Nov. 1, 1984, as amended by CGD7-84-01, 50 FR 25073, June 17, 1985; CGD7-87-45, 53 FR 4394, Feb. 16, 1988; CGD7-90-08, 56 FR 16008, Apr. 19, 1991; USCG-2021-0012, 86 FR 27520, May 21, 2021; USCG-2025-1113, 91 FR 3035, Jan. 26, 2026; USCG-2026-1095, 91 FR 56779, Sept. 4, 2026]
§ 117.373 St. Marys River.
See § 117.329, St. Marys River, listed under Florida.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
73 Idaho
§ 117.381 Clearwater River.
The draws of the Camas Prairie railroad bridge, mile 0.6 at Lewiston, shall open on signal if at least three hours notice is given to the Camas Prairie Railroad in Lewiston.
[CGD 82--025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000]
§ 117.383 Pend Oreille River.
The draw of the Burlington Northern Santa Fe railroad bridge, mile 111.3 near Sand-point, need not be opened for the passage of vessels.
§ 117.385 Snake River.
The drawspan of the U.S. 12 bridge, mile 140.0, between Lewiston, Idaho, and Clarkston, Washington, operates as follows:
(a) The draw need not open for the passage of vessels except at these hours:
(1) From March 15 through November 15 at 6 a.m., 10 a.m., 3 p.m., 7 p.m., and 9 p.m.
(2) From November 16 through March 14 at 9 a.m., 10 a.m., 2 p.m., and 3 p.m.
(b) Requests for openings shall be given to the Washington State Department of Transportation.
(1) Monday through Thursday of every week, except holidays, the draw shall open if at least two hours notice is given.
(2) Friday through Sunday of every week, except holidays, the draw shall open if notice is given by 5 p.m. of the preceding Wednesday.
(3) The draw shall open on holidays if notice is given by 5 p.m. two workdays, excluding Friday, preceding the holiday.
(4) The draw shall open at any time for the passage of vessels engaged in an emergency.
[CGD13-92-01, 57 FR 38608, Aug. 26, 1992]
74 Illinois
§ 117.391 Chicago River.
The draws of the bridges operated by the City of Chicago over the Main Branch of Chicago River, the bridges on the North Branch of Chicago River from the Main Branch to North Halsted Street, mile 2.65, and bridges on the South Branch of Chicago River from the Main Branch to South Ashland Avenue, mile 4.47, shall operate as follows:
(a) For commercial vessels, all bridges shall open on signal if at least 12-hours advance notice is provided to the Chicago City Bridge Desk prior to the intended time of passage; except that, from Monday through Friday between the hours of 7 a.m. and 9:30 a.m., and between the hours of 4 p.m. and 6:30 p.m., except for Federal holidays, the draws need not open for the passage of vessels.
(b) For recreational vessels:
(1) From April 1 through November 30—
(i) The draws shall be scheduled to open, before 1 p.m., twice on Saturdays and twice on Sundays if requests for passage have been received at least 20 hours in advance. If the bridges have been authorized to remain closed for portions of a Saturday or Sunday to accommodate special events, openings shall be scheduled after 1 p.m. as necessary to provide two openings per day.
(ii) The draws shall open on Monday and Friday, after 6:30 p.m. Each opening requires notice that has been given at least 6 hours in advance of a vessel's requested time of passage.
(iii) The draws shall open on Wednesdays at 10 a.m., or as soon thereafter as practical, if a request for passage has been given at least 20 hours in advance.
(iv) The draws shall open at times in addition to those listed in paragraphs (b)(1)(i) through (b)(1)(iii) of this section, after notice has been given at least 20 hours in advance requesting passage for a flotilla of at least five vessels. However, the bridges need not open Monday through Friday from 7 a.m. to 9:30 a.m., and 4 p.m. to 6:30 p.m., except for Federal holidays.
(2) From December 1 through March 31, the draws shall open on signal if at least 48 hours notice is given. However, the bridges need not open Monday through Friday from 7 a.m. to 9:30 a.m., and 4 p.m. to 6:30 p.m., except for Federal holidays.
(c) The following bridges need not be opened for the passage of vessels: The draws of South Damen Avenue, mile 6.14, over South Branch of Chicago River; all highway drawbridges between South Western Avenue, mile 6.7, and Willow Springs Road, mile 19.4, over Chicago Sanitary and Ship Canal; North Halsted Street, mile 2.85, and Division Street, mile 2.99, over North Branch Canal of Chicago River; and Division Street, mile 3.30, North Avenue, mile 3.81, Cortland Avenue, mile 4.48, Webster Avenue, mile 4.85, North Ashland Avenue, mile 4.90, and Union Pacific Railroad, mile 5.01, over North Branch of Chicago River.
(d) [Reserved]
(e) The Amtrak Bridge, mile 3.77, is authorized to operate remotely and open to the intermediate position on signal, unless a request for a full opening is received by the drawtender. The bridge is required to operate a marine radio.
[CGD09-95-023, 60 FR 52311, Oct. 6, 1995, as amended by CGD09-01-148, 67 FR 31729, May 10, 2002; USCG-2019-0366, 84 FR 29804, June 25, 2019; USCG-2020-0034, 86 FR 43915, Aug. 11, 2021; USCG-2022-0989, 88 FR 36243, June 2, 2023]
§ 117.393 Illinois Waterway.
(a) The draw of the automated Burlington Northern Santa Fe railroad bridge, mile 88.8 at Beardstown, Illinois, operates as follows:
(1) The draw is normally maintained in the fully open position, displaying a green light to indicate that vessels may pass.
(2) When a vessel is approaching and the draw is in the open position, contact shall be established by radiotelephone with the remote operator to assure that the draw remains open until passage is complete.
(3) When a vessel is approaching and the draw is in the closed position, contact shall be established by radiotelephone with the remote operator. If the draw cannot be opened immediately, alternate flashing red lights are displayed. If the draw can be opened immediately, flashing amber lights are displayed.
(4) When a train approaches the bridge and the draw is in the open position, the operator shall activate alternate flashing red lights on top of the draw, sound four short blasts, and scan the river on radar to determine whether any vessel is approaching the bridge. The remote operator shall also broadcast that the draw is closing. If a vessel or vessels are approaching the bridge within one mile, as determined by radar scanning, response to radio broadcast, or electronic detector, the flashing red lights shall be changed to flashing amber and the operator shall keep the draw in the fully open position until the vessel or vessels have cleared the bridge. If no vessel is approaching the bridge or is beneath the draw, the draw may be lowered and locked in place.
(5) After the train has cleared the bridge, the draw shall be raised to its full height and locked in place, the red flashing lights stopped, and the draw lights changed from red to green.
(b) The draw of the Chessie Railroad Bridge, mile 254.1, at Seneca, Illinois, operates as follows:
(1) The draw is normally maintained in the fully open position, displaying green mid-channel lights to indicate the span is fully open.
(2) When a train approaches the bridge and the draw is in the open position, the train will stop, train operator shall walk out on the bridge and scan the river for approaching vessels.
(3) If a vessel is approaching the bridge, the draw will remain open. The vessel shall contact the train operator on VHF-FM channel 16 and the train operator shall keep the draw in the fully open position until the vessel has cleared the bridge.
(4) If no vessels are observed, the train operator initiates a five minute warning period on VHF-FM radio channel 16 before closing the bridge. The train operator will broadcast the following message: “The Chessie Railroad Bridge at Mile 254.1, Illinois River, will close to navigation in five minutes.” The announcement is repeated every minute counting down the time remaining until closure.
(5) At the end of the five minute warning period, and if no vessels are approaching the bridge, the train operator shall sound the siren for 10 seconds, activate the alternate flashing red lights on top of the draw, then lower and lock the draw in place. Red lights shall continue to flash to indicate the draw is closed to navigation.
(6) After the train has cleared the bridge, the draw shall be raised to its full height and locked in place, the red flashing lights stopped, and the draw lights changed from red to green.
(c) The draws of the McDonough Street Bridge, mile 287.3; Jefferson Street bridge, mile 287.9; Cass Street bridge, mile 288.1; Jackson Street bridge, mile 288.4; and Ruby Street bridge, mile 288.7; all of Joliet, shall open on signal, except that they need not open from 7:30 a.m. to 8:30 a.m. and from 4:15 p.m. to 5:15 p.m. Monday through Saturday.
(d) The drawspan of the Elgin, Joliet and Eastern Railway bridge, mile 290.1 at Lockport, Illinois, is operated by remote operator located at the Elgin, Joliet & Eastern offices in Homewood, Illinois as follows:
(1) The drawspan is normally maintained in the fully open to navigation position displaying green center span navigation lights to indicate that the drawspan is fully open.
(2) The bridge is equipped with the following:
(i) A radiotelephone link direct to the remote operator;
(ii) A radar antenna on top of the drawspan capable of scanning the river, one mile upstream and one mile downstream;
(iii) Infrared boat detectors under the drawspan, to allow the remote bridge operator to detect vessels under the drawspan;
(iv) Electronic motion detectors under the drawspan to allow the remote bridge operator to detect vessel movement under the drawspan;
(v) A siren for sound signals; and
(vi) Red and green center span navigation lights.
(3) The remote bridge operator shall maintain a 24 hour VHF marine radio watch for mariners to establish contact as they approach the bridge to ensure that the drawspan is open or that it remains open until passage of river traffic is complete.
(4) When rail traffic approaches the bridge, and the drawspan is in the open position, the remote bridge operator initiates a one minute warning period before closing the drawspan. During this warning period, the remote operator shall broadcast at least twice, via marine radio, that: “The drawspan of the EJ&E Railroad bridge will be lowered in one minute.” A siren on the bridge sounds for 20 seconds, to warn anyone on or under the bridge that the drawspan will be lowered.
(5) If a vessel is approaching the bridge upbound or, departing the Lockport Lock and Dam at mile 291.1, downbound, with intentions of passing through the drawspan, they shall respond to the remote bridge operators' marine radio broadcast, or initiate radio contact, indicating their proximity to the bridge and requesting an opening of the drawspan or that the drawspan remain open until the vessel passes. If any approaching vessel is detected or if a radiotelephone response is received, the remote operator shall not close the drawspan until the vessel or vessels have cleared the bridge.
(6) At the end of the one minute warning period, if no river traffic is approaching or under the drawspan, the remote bridge operator may begin lowering the drawspan. Navigation lights located at the center of the drawspan change from green to red when the drawspan is not in the fully open to navigation position. The drawspan takes approximately 90 seconds to lower.
(7) If the presence of a vessel or other obstruction is discovered approaching or under the drawspan, during the lowering sequence, before the drawspan is fully lowered and locked, the drawspan shall be stopped and raised to the fully open position. When the vessel or obstruction has cleared the drawspan, the remote operator shall confirm that the channel is clear and reinitiate the one minute warning cycle before lowering the drawspan.
(8) If no marine traffic is present the drawspan may be lowered and seated. When the drawspan is lowered and locked in the closed to navigation position, the remote bridge operator periodically broadcasts, via marine radio, that: “The drawspan of the EJ&E Railroad bridge is closed to navigation.”
(9) Failure of the radar system, radio telephone system, infrared boat detectors or electronic motion sensors shall prevent lowering the drawspan from the remote location.
(10) when rail traffic has cleared the bridge, the remote bridge operator shall raise the drawspan to the fully open to navigation position. When the drawspan is raised and in the fully open to navigation position, the remote bridge operator broadcasts, at least twice, via marine radio, that: “The drawspan of the EJ&E Railroad bridge is open to navigation.” The center drawspan navigation lights change from red to green when the drawspan is fully open to navigation.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD02 93-036, 59 FR 33677, June 30, 1994; USCG-1998-3799, 63 FR 35527, June 30, 1998; USCG-1999-5832, 64 FR 34712, June 29, 1999; CGD08-99-014, 64 FR 61520, Nov. 12, 1999; CGD08-06-013, 72 FR 19668, Apr. 19, 2007; USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 117.397 Wabash River.
The draws of the bridges across the Wabash River need not be opened for the passage of vessels.
[USCG-2008-0100, 73 FR 76219, Dec. 16, 2008]
75 Indiana
§ 117.400 Indiana Harbor Canal.
(a) Elgin, Joliet, and Eastern Railroad Bridge, 0.68, over the Indiana Harbor Canal need not have a drawtender in continued attendance at the bridge. Ten minutes before the bridge is lowered for train traffic a crewmember from the train will initiate a SECURITE call on VHF-FM Marine Channel 16 that the bridge will be lowering for train traffic and invite any concerned mariners to contact the crewmember on VHF-FM Marine Channel 12. The crewmember will also visually monitor for vessel traffic and listen for the standard bridge opening signal of one prolonged blast and one short blast from vessels already transiting the waterway. After the ten minute warning, another SECURITE shall be made on VHF-FM Marine Channel 16 that the bridge will be lowering for rail traffic, five minutes before lowering. Once the draw tender is satisfied that it is safe, the bridge will be lowered for rail traffic. Once the rail traffic has cleared the bridge, the bridge shall be raised and locked in the fully open to navigation position.
(b) Elgin, Joliet, and Eastern Railroad Bridge, mile 1.89, over the Indiana Harbor Canal need not have a drawtender in continued attendance at the bridge. Ten minutes before the bridge is lowered for train traffic a crewmember from the train will initiate a SECURITE call on VHF-FM Marine Channel 16 that the bridge will be lowering for train traffic and invite any concerned mariners to contact the crewmember on VHF-FM Marine Channel 12. The crewmember will also visually monitor for vessel traffic and listen for the standard bridge opening signal of one prolonged blast and one short blast from vessels already transiting the waterway. After the ten minute warning, another SECURITE shall be made on VHF-FM Marine Channel 16 that the bridge will be lowering for rail traffic, five minutes before lowering. Once the crewmember is satisfied that it is safe, the bridge will be lowered for rail traffic. Once the rail traffic has cleared the bridge, the bridge shall be raised and locked in the fully open to navigation position.
(c) The Indianapolis Boulevard Bridge, mile 2.59, at East Chicago, shall open on signal if at least twelve hours' notice is given.
[USCG-2020-0235, 86 FR 18446, Apr. 9, 2021, as amended by USCG-2021-0332, 86 FR 64819, Nov. 19, 2021]
§ 117.401 Trail Creek.
(a) The draw of the Franklin Street bridge, mile 0.5 at Michigan City, shall be operated as follows:
(1) From March 16 through November 30, the draw shall open on signal; except from 6:15 a.m. to 11:15 p.m., Monday through Sunday, the draw need open only from three minutes before to three minutes after the quarter-hour and three-quarter hour.
(2) From December 1 through March 15, the draw shall open on signal if at least 12-hours advance notice is provided prior to intended time of passage.
(b) The draw of the Amtrak Railroad Bridge, mile 0.9, at Michigan City shall open on signal, except from December 1 through March 15 the draw shall open if at least 12-hours advance notice is given. The bridge is authorized to be operated remotely. The bridge shall operate and maintain a VHF-FM Marine Radio.
(c) Public vessels of the United States, state or local vessels used for public safety, vessels in distress, and vessels seeking shelter from severe weather shall be passed through the draws of each bridge as soon as possible.
[CGD09-01-001, 66 FR 27867, May 21, 2001, as amended by USCG-2022-0303, 88 FR 28991, May 5, 2023]
§ 117.403 Wabash River.
See § 117.397, Wabash River, listed under Illinois.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
76 Iowa
§ 117.407 Missouri River.
See § 117.691, Missouri River listed under Nebraska.
[CGD08-06-002, 71 FR 66874, Nov. 17, 2006]
77 Kansas
§ 117.411 Missouri River.
(a) The draws of the bridges across the Missouri River shall open on signal; except during the winter season between the date of closure and the date of opening of the commercial navigation season as published by the Army Corps of Engineers, the draw need not open unless at least 24 hours advance notice is given.
(b) The draw of the Atchison Railroad Bridge, Mile 422.5, Missouri River need not open unless a two-hour advance notice is given during the commercial navigation season.
[USCG-2014-0358, 80 FR 81181, Dec. 29, 2015]
78 Kentucky
§ 117.415 Green River.
(a) The draw of the CSX Transportation railroad bridge, Mile 8.3 at Spottsville, shall open on signal when there is 40 feet or less of vertical clearance beneath the draw. When vertical clearance is more than 40 feet, at least four hours notice shall be given. The owners of, or agencies controlling, the bridge shall arrange for ready telephone communication with the authorized representative at any time from the bridge or its immediate vicinity.
(b) The bascule span of the Paducah and Louisville Railroad Bridge, Mile 94.8 at Rockport, is maintained in the closed position and is remotely operated. Bridge clearance in the closed position in 41.3 feet at pool stage. Vessels requiring more clearance for passage must contact the remote bridge operator by radio telephone to request opening. The bridge operator will confirm by radiotelephone whether the bridge can be opened safely and promptly. If rail traffic is on or approaching the bridge, the bridge operator will advise the vessel that the bridge cannot be opened, and provide an approximate time when the bridge can be opened safely. Continuous radio contact between the bridge operator and the vessel shall be maintained until the vessel has transited and cleared the bridge.
[CGD2 88-01, 53 FR 23621, June 23, 1988, as amended by CGD2-91-04, 56 FR 16009, Apr. 19, 1991; CGD2-91-07, 57 FR 2841, Jan. 24, 1992; USCG-2013-0041, 78 FR 21841, Apr. 12, 2013]
§ 117.417 Ohio River.
The draw of the Southern Railway railroad bridge, mile 607.4 at New Albany, Indiana, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984]
79 Louisiana
§ 117.422 Amite River.
(a) The draw of the S22 bridge, mile 6.0 at Clio, shall open on signal if at least four hours notice is given.
(b) The draws of the S16 bridge, mile 21.4 near French Settlement, and the S42 bridge, mile 32.0 at Port Vincent, shall open on signal if at least 48 hours notice is given.
[CGD 82-025, 49 FR 17452, as amended by CGD 08-84-04, 49 FR 48924, Dec. 17, 1984. Redesignated by CGD8-88-05, 53 FR 27681, July 22, 1988]
§ 117.423 Atchafalaya River.
The draw of the Kansas City Southern Railway bridge, mile 133.1 (mile 5.0 on N.O.S. Chart) above the mouth of the waterway, at Simmesport, shall open on signal if at least three hours advance notice is given.
[CGD8-88-05, 53 FR 27681, July 22, 1988]
§ 117.424 Belle River.
The draw of the SR70 bridge, mile 23.8 near Belle River, shall open on signal; except that, from 10 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given, and from June 1 through August 31 the draw shall open on signal on the hour from 6 a.m. to 10 p.m. The bridge shall open anytime at the direction of the District Commander.
[USCG-2018-0955, 85 FR 56517, Sept. 14, 2020]
§ 117.425 Black Bayou.
The draws of the Terrebonne Parish Police Jury bridges, miles 7.5, 15.0, 18.7 and 22.5, between Gibson and Houma, shall open on signal if at least 24 hours notice is given. The draw of the US182 bridge, mile 7.0 near Gibson, need not be opened for the passage of vessels.
[CGD8-87-12, 53 FR 5974, Feb. 29, 1988, as amended by USCG-2013-0397, 78 FR 39174, July 1, 2013]
§ 117.429 Boeuf Bayou.
The draw of the S307 bridge, mile 1.3 at Kraemer, shall open on signal; except that, from 9 p.m. to 5 a.m., the draw shall open on signal if at least 12 hours notice is given.
§ 117.433 Bonfouca Bayou.
The draw of the S433 Bridge, mile 7.0, at Slidell, shall open on signal, except that from 6 p.m. to 6 a.m. from November 1 through February 28 or February 29, the draw shall open on signal if at least two hours, notice is given. From March 1 through October 30, from 9 p.m. to 7 a.m. the draw shall open on signal if at least two hours, notice is given. On Monday through Friday, except Federal holidays, throughout the year, the draw need not open for the passage of vessels from 7 a.m. to 8 a.m. and from 1:45 p.m. to 2:45 p.m.
[USCG-2009-0863, 76 FR 52569, Aug. 23, 2011]
§ 117.434 Caddo Lake.
The draw of the Kansas City Southern railroad bridge, mile 26.4 near Mooringsport, shall open on signal if at least 24 hours notice is given.
[CGD82-025, 49 FR 17452. Redesignated by CGD08-96-053, 64 FR 8722, Feb. 23, 1999]
§ 117.435 Carlin Bayou.
(a) The draw of the Louisiana and Delta Railroad (LDRR) Bridge, mile 6.4, at Delcambre, shall operate as follows:
(1) The draw shall be maintained in the fully open position for navigation at all times, except during periods when it is closed for the passage of rail traffic.
(2) When a train approaches the bridge, it will stop and a crewmember from the train will observe the waterway for approaching vessels. If vessels are observed approaching the bridge, they will be allowed to pass prior to lowering the bridge. The crewmember will verify that the adjacent highway bridge is in the closed-to-navigation position prior to initiating the lowering sequence.
(3) After the train has completely passed over the bridge, the crewmember will initiate the raising sequence.
(4) To request openings of the bridge when the lift span is in the closed-to-navigation position, mariners may call the LDRR Signal Supervisor at 337-316-6015.
(b) The draw of the S14 bridge, mile 6.4 at Delcambre, shall open on signal; except that, from 9 p.m. to 5 a.m. the draw shall open on signal if at least four hours notice is given. The draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
[CGD8-88-19, 54 FR 16107, Apr. 21, 1989. Redesignated by CGD08-96-053, 64 FR 8722, Feb. 23, 1999; USCG-2012-0180, 77 FR 57021, Sept. 17, 2012]
§ 117.436 Chef Menteur Pass.
The draw of the U.S. Highway 90 bridge, mile 2.8, at Lake Catherine, shall open on signal; except that, from 5:30 a.m. to 7:30 a.m., Monday through Friday except Federal holidays, the draw need open only on the hour and on the half-hour for the passage of vessels. The draw shall open at any time for a vessel in distress.
[CGD08-01-005, 66 FR 11110, Feb. 22, 2001]
§ 117.438 Colyell Bayou.
The removable span of the Louisiana highway bridge, mile 1.0 near Port Vincent, shall be removed for the passage of vessels if at least 48 hours notice is given.
[ CGD 82-025, 49 FR 17452, Apr. 24, 1984. Redesignated by USCG-2014-1039, 80 FR 11550, Mar. 4, 2015]
§ 117.439 Company Canal.
(a) The draw of the LA1 bridge, mile 0.4 at Lockport, shall open on signal; except that, from 6 p.m. to 10 a.m. the draw shall open on signal if at least four hours notice is given. During the advance notice period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
(b) The draw of the S24 bridge, mile 8.1 at Bourg, shall open on signal; except that, from 10 p.m. to 6 a.m. the draw shall open on signal if at least four hours notice is given. During the advance notice period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
[CGD 08-84-12, 50 FR 23306, June 3, 1985. Redesignated and amended by CGD8-85-10, 50 FR 38001, Sept. 19, 1985; USCG-2011-0257, 76 FR 31837, June 2, 2011. Redesignated by USCG-2014-1039, 80 FR 11550, Mar. 4, 2015]
§ 117.440 Des Allemands Bayou.
(a) The draw of the S631 bridge, mile 13.9 at Des Allemands, shall open on signal if at least four hours notice is given.
(b) The draw of the Burlington Northern Santa Fe Railroad bridge, mile 14.0, shall open on signal Monday through Friday from 7 a.m. to 3 p.m. At all other times the draw shall open on signal if at least 4 hours notice is given.
[CGD08-93-028, 59 FR 14757, Mar. 30, 1994. Redesignated by USCG-2014-1039, 80 FR 11550, Mar. 4, 2015]
§ 117.441 D'Inde Bayou.
The draw of the Union Pacific railroad bridge, mile 4.3, shall open on signal if at least 72 hours notice is given to the Defense Plant Corporation, Cities Service Refining Corporation Agent.
§ 117.443 Du Large Bayou.
The draw of the Terrebonne Parish bridge, mile 23.2, near Theriot, shall open on signal; except that, from 9 p.m. to 5 a.m., the draw shall open on signal if at least 12 hours notice is given.
[CGD 08-84-07, 50 FR 24195, June 10, 1985]
§ 117.444 Falgout Canal.
The draw of the LA 315 bridge across Falgout Canal, mile 3.1, shall open on signal; except that from 15 August to 5 June, the draw need not be opened from 7 a.m. to 8 a.m. and from 3 p.m. to 4 p.m., Monday through Friday except holidays. The draw shall open on signal at any time for an emergency aboard a vessel.
[CGD8-91-11, 56 FR 43872, Sept. 5, 1991]
§ 117.445 Franklin Canal.
The draw of the Chatsworth Bridge, mile 4.8 at Franklin, shall open on signal from 5 a.m. to 9 p.m. if at least one hour notice is given. From October 1 through January 31 from 9 p.m. to 5 a.m., the draw shall be opened on signal if at least three hours notice is given. From February 1 through September 30 from 9 p.m. to 5 a.m., the draw shall open on signal if at least 12 hours notice is given.
[USCG-2009-0670; 74 FR 66238, Dec. 15, 2009]
§ 117.449 Grosse Tete Bayou.
The removable span of the S377 Bridge, mile 15.3 near Rosedale, shall be opened for the passage of vessels if at least 48 hours notice is given.
[USCG-2012-0115, 77 FR 57494, Sept. 18, 2012]
§ 117.451 Gulf Intracoastal Waterway.
(a) The draw of the Lapalco Boulevard Bridge, Harvey Canal Route, mile 2.8 at Harvey, shall open on signal; except that, from 6:30 a.m. to 8:30 a.m. and from 3:45 p.m. to 5:45 p.m. Monday through Friday except holidays, the draw need not be opened for the passage of vessels.
(b) The draw of the SR 23 bridge, Algiers Alternate Route, mile 3.8 at Belle Chasse, shall open on signal; except that, from 6 a.m. to 8:30 a.m. and from 3:30 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draw need not be opened for the passage of vessels.
(c) The draw of the SR 315 (Bayou Dularge) bridge, mile 59.9 west of Harvey Lock, at Houma, shall open on signal; except that, the draw need not open for the passage of vessels Monday through Friday except Federal holidays from 6:30 a.m. to 8:30 a.m., from 11:45 a.m. to 12:15 p.m., from 12:45 p.m. to 1:15 p.m. and from 4:30 p.m. to 6 p.m.
(d) The draw of the SR 319 (Louisa) bridge across the Gulf Intracoastal Waterway, mile 134.0 west of Harvey Lock, near Cypremort, shall open on signal if at least 24 hours notice is given.
(e) The draw of the Louisiana highway bridge, mile 243.8 west of Harvey Canal Locks, shall open on signal when more than 50 feet vertical clearance is required, if at least four hours notice is given to the Louisiana Department of Highways, District Maintenance Engineer, at Lake Charles.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984]
Editorial Note:For Federal Register citations affecting § 117.451, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.453 Houma Canal.
The draw of the S3197 bridge, mile 1.7 at Houma, shall open on signal if at least four hours notice is given.
[CGD 08-84-06, 50 FR 1850, Jan. 14, 1985]
§ 117.455 Houma Navigation Canal.
The draw of SR 661 (Houma Nav Canal) bridge, mile 36.0, at Houma, shall open on signal; except that, the draw need not open for the passage of vessels Monday through Friday except Federal holidays from 6:30 a.m. to 8:30 a.m., from 11:45 a.m. to 12:15 p.m., from 12:45 p.m. to 1:15 p.m. and from 4:30 p.m. to 6 p.m.
[CGD08-05-004, 70 FR 20469, Apr. 20, 2005]
§ 117.457 Houston River.
The draw of the Kansas City Southern Railroad bridge, mile 5.2 near Lake Charles, shall open on signal if at least 24 hours notice is given.
§ 117.458 Inner Harbor Navigation Canal, New Orleans.
(a) The draws of the SR 46 (St. Claude Avenue) bridge, mile 0.5 (GIWW mile 6.2 East of Harvey Lock), the SR 39 (Judge Seeber/Claiborne Avenue) bridge, mile 0.9 (GIWW mile 6.7 East of Harvey Lock), and the Florida Avenue bridge, mile 1.7 (GIWW mile 7.5 East of Harvey Lock), shall open on signal; except that, from 6:30 a.m. to 8:30 a.m. and from 3:30 p.m. to 5:45 p.m., Monday through Friday, except federal holidays, the draws need not open for the passage of vessels. The draws shall open at any time for a vessel in distress.
(b) The US 90 (Danzinger) Bridge, mile 3.1, shall open on signal if at least two hours notice is given; except that the draw need not be opened from 7 a.m. to 8:30 a.m. and 5 p.m. to 6:30 p.m. Monday through Friday.
(c) The draw of the Senator Ted Hickey (Leon C. Simon Blvd./Seabrook) Bridge, mile 4.6, shall open on signal from 7 a.m. to 8 p.m.; except that the bridge need not open from 7 a.m. to 8:30 a.m. and 5 p.m. to 6:30 p.m. Monday through Friday. From 8 p.m. to 7 a.m., the draw shall open on signal if at least two hours notice is given.
[CGD8-89-05, 54 FR 36305, Sept. 1, 1989, as amended by CGD08-01-002, 66 FR 27026, May 16, 2001; GCD08-03-030, 68 FR 69609, Dec. 15, 2003; USCG-2010-0351, 75 FR 49411, Aug. 13, 2010; USCG-2013-0562, 79 FR 8269, Feb. 12, 2014]
§ 117.459 Kelso Bayou.
The draw of the S27 bridge mile 0.7 at Hackberry, shall operate as follows:
(a) From May 20, through October 31, the draw shall open on signal from 7 a.m. to 7 p.m. From 7 p.m. to 7 a.m., the draw shall open on signal if at least four hours notice is given.
(b) From November 1 through December 22, the draw shall open on signal from 7 a.m. to 3 p.m. From 3 p.m. to 7 a.m., the draw shall open on signal if at least four hours notice is given.
(c) From December 23 through May 19, the draw shall open on signal if at least 24 hours notice is given.
[CGD 08-94-028, 63 FR 40654, July 30, 1998]
§ 117.460 La Carpe Bayou.
The draw of the S661 bridge, mile 7.5, shall open on signal if at least four hours advance notice is given; except that, the draw need not be opened for the passage of vessels Monday through Friday except holidays from 7 a.m. to 8:30 a.m. and 4:30 p.m. to 6 p.m.
[CGD8-90-05, 55 FR 33289, Aug. 15, 1990]
§ 117.461 Lacassine Bayou.
The draws of the S14 bridge, mile 17.0, and the Southern Pacific railroad bridge, mile 20.4, both near Hayes, shall open on signal if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984]
§ 117.463 Lacombe Bayou.
(a) The draw of the US190 bridge, mile 6.8 at Lacombe, shall open on signal if at least 48 hours notice is given.
(b) The draw of the Tammany Trace bridge, mile 5.2 at Lacombe, shall open on signal if at least 2 hours notice is given.
[USCG-2018-0953, 85 FR 45094, July 27, 2020]
§ 117.465 Lafourche Bayou.
(a) The draws of the following bridges shall open on signal; except that, from August 1 through May 31, the draw need not open for the passage of vessels Monday through Friday except Federal holidays from 7 a.m. to 8:30 a.m.; from 2 p.m. to 4 p.m. and from 4:30 p.m. to 5:30 p.m., unless otherwise indicated:
(1) SR 308 (Golden Meadow) Bridge, mile 23.9, at Golden Meadow
(2) Galliano Pontoon Bridge, mile 27.8, at Galliano
(3) SR 308 (South Lafourche (Tarpon)) Bridge, mile 30.6, at Galliano, need not open for the passage of vessels from August 1 through May 31, Monday through Friday except Federal holidays from 6:45 a.m. to 8:30 a.m.; from 2 p.m. to 4 p.m. and from 4:30 p.m. to 5:30 p.m.
(4) Cote Blanche Pontoon Bridge, mile 33.9, at Cutoff
(5) Cutoff Vertical Lift Bridge, mile 36.3, at Cutoff
(6) LA 657 (Larose) Vertical Lift Bridge, mile 38.7, at Larose.
(b) The draw of the Valentine bridge, mile 44.7 at Valentine, shall open on signal; except that, from 6 p.m. to 6 a.m., the draw shall open on signal if at least four hours advance notification is given. During the advance notification period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in water traffic occur.
(c) The draws of the S3220 bridge, mile 49.2 near Lockport, and the S655 bridge, mile 50.8 at Lockport, shall open on signal; except that, from 6 p.m. to 10 a.m. the draws shall open on signal if at least four hours notice is given. During the advance notice period, the draws shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
(d) The draw of the State Route LA 654 bridge, mile 53.2 at Clotilda, shall open on signal if at least four hours notice is given. During the advance notice period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
(e) The draws of the S3199 bridge, mile 58.2, and the Lafourche Parish bridge, mile 58.7, both at Raceland, shall open on signal if at least six hours notice is given.
(f) The draw of the S649 bridge, mile 66.6, shall open on signal if at least forty-eight hours notice is given.
(g) The draws of the Burlington Northern Santa Fe railroad bridge, mile 69.0 at Lafourche, and all bridges upstream of the Burlington Northern Santa Fe railroad bridge need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984]
Editorial Note:For Federal Register citations affecting § 117.465, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.467 Lake Pontchartrain.
(a) The south draw of the S11 bridge near New Orleans shall open on signal if at least 48 hours notice is given. In case of emergency, the draw shall open within 12 hours and shall be kept in condition for immediate operation until the emergency is over.
(b) The draw of the Norfolk Southern Railroad Bridge across Lake Pontchartrain, mile 4.80 near Slidell, St. Tammany Parish, Louisiana shall be maintained as follows:
(1) The draw shall be maintained in the fully open-to-navigation position for vessels at all times, except during periods when it is closed for the passage of rail traffic or to perform periodic maintenance authorized in accordance with subpart A of this part.
(2) The draw shall be remotely operated by the drawtender at Norfolk Southern's drawbridge in Decatur, Alabama. The estimated duration that the bridge will remain closed for the passage of rail traffic is 10 to 15 minutes per operation.
(3) When a train approaches the bridge, the drawtender will initiate the bridge closing warning signal, consisting of radio calls via VHF-FM-channels 13 and 16 and activation of flashing red warning lights at each end of the span. The radio calls will be broadcast at five (5) minutes prior to bridge closing and at two (2) minutes prior to bridge closing. Photoelectric (infrared) boat detectors will monitor the waterway beneath the bridge for the presence of vessels.
(4) The drawtender will continuously monitor waterway traffic in the area using closed-circuit cameras mounted on the bridge. The draw will only be closed if the drawtender's visual inspection indicates that the channel is clear and there are no vessels transiting in the area. The drawtender will maintain constant surveillance of the navigation channel to ensure that no conflict with maritime traffic exists. Additionally, the draw will not be closed if the S11 bascule bridge that is located immediately west of the railroad bridge is in the open-to-navigation position. If two or more closed-circuit cameras are inoperable or if there is inclement weather, the draw will only be operated by a drawtender located on site at the bridge.
(5) At the end of the two-minute warning period, if no vessels have been detected by the drawtender, the draw closing sequence will automatically proceed.
(6) Upon passage of the train, the draw will be returned to the fully open-to-navigation position to allow marine traffic to pass. The warning lights will continue to flash red until the draw has returned to the fully open-to-navigation position at which time they will deactivate.
(7) After the passage of each train, the draw must be returned to its fully open-to-navigation position.
(8) To request openings of the draw when the bascule span is in the closed-to-navigation position, mariners may contact Norfolk Southern Railway via VHF-FM channel 13 or by telephone at the number displayed on the signs posted at the bridge.
(9) The draw will be operated locally if:
(i) Communication is lost between the drawbridge and the drawtender in Decatur, Alabama;
(ii) More than two closed-circuit cameras are not working;
(iii) The marine radio is inoperable;
(iv) Weather conditions warrant; or
(v) Ordered by the Coast Guard.
(c) The draw of the Greater New Orleans Expressway Commission Causeway shall open on signal if at least three hours notice is given; except that, the draw need not be opened for the passage of vessels Monday through Friday except Federal holidays from 5:30 a.m. to 9:30 a.m. and from 3 p.m. until 7 p.m. The draw will open on signal for any vessel in distress or vessel waiting immediately following the closures listed above.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD8-90-02, 55 FR 13522, Apr. 11, 1990; CGD08-01-022, 66 FR 56208, Nov. 7, 2001; USCG-2015-0814, 80 FR 81183, Dec. 29, 2015]
§ 117.469 Liberty Bayou.
The draw of the S433 Bridge, mile 2.0, at Slidell, shall open on signal, except that between 7 p.m. to 7 a.m., the draw shall open on signal if at least two hours notice is given.
[USCG-2007-0078, 73 FR 12886, Mar. 11, 2008]
§ 117.475 Little (Petit) Caillou Bayou.
(a) The draws of the S58 bridge, mile 25.7 at Sarah, and the Terrebonne Parish (Smithridge) bridge, mile 26.6 near Montegut, shall open on signal; except that, from 9 p.m. to 5 a.m., the draws shall open on signal if at least 12 hours notice is given.
(b) The draws of the Terrebonne Parish (DuPlantis) bridge, mile 29.9 near Bourg, and the S24 bridge, mile 33.7 at Presquille, shall open on signal if at least four hours notice is given. The draws shall open on less than four hours notice for an emergency, and shall open on signal should a temporary surge in waterway traffic occur.
[CGD8-86-02, 51 FR 31113, Sept. 2, 1986]
§ 117.477 Lower Atchafalaya River.
The draw of the St. Mary Parish bridge, mile 26.8 at Patterson, shall open on signal from 5 a.m. to 9 p.m. From October 1 through January 31 from 9 p.m. to 5 a.m., the draw shall open on signal if at least three hours notice is given. From February 1 through September 30 from 9 p.m. to 5 a.m., the draw shall open on signal if at least 12 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984]
§ 117.478 Lower Grand River.
(a) The draw of the LA 75 bridge, mile 38.4 (Alternate Route) at Bayou Sorrel, shall open on signal; except that from about August 15 to about June 5 (the school year), the draw need not be opened from 6 a.m. to 8 a.m. and from 3 p.m. to 4:30 p.m., Monday through Friday except holidays. The draw shall open on signal at any time for an emergency aboard a vessel.
(b) The draw of the LA 77 bridge, mile 47.0 (Alternate Route) at Grosse Tete, shall open on signal; except that, from about August 15 to about June 5 (the school year), the draw need not be opened from 6 a.m. to 8 a.m. and from 2:30 p.m. to 4:30 p.m., Monday through Friday except Federal holidays. The draw shall open on signal at any time for an emergency aboard a vessel.
(c) The draw of the S997 bridge, mile 41.5 (Landside Route) at Pigeon, shall open on signal; except that, from 10 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given. During the advanced notice period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
[CGD8-92-16, 57 FR 57962, Dec. 8, 1992, as amended by CGD08-93-024, 59 FR 14756, Mar. 30, 1994; CGD08-96-003, 61 FR 49064, Sept. 18, 1996; USCG-2009-0686, 75 FR 16009, Mar. 31, 2010]
§ 117.480 Mermentau River.
The draw of the S82 bridge, mile 7.1 at Grand Chenier, shall open on signal; except that, from 6 p.m. to 6 a.m. the draw shall open on signal if at least 4 hours notice is given. During the advance notice period, the draw will open on less than 4 hours notice for an emergency and will open on demand should a temporary surge in waterway traffic occur.
[CGD8-94-027, 60 FR 14221, Mar. 16, 1995]
§ 117.481 Milhomme Bayou.
The draw of the Stephensville Bridge, mile 12.2 (Landside Route) at Stephensville shall open on signal if at least one hour of advance notice is given. During the advance notice period, the draw shall open on less than one hour notice for an emergency, and shall open on demand should a temporary surge in waterway traffic occur.
[73 FR 43, Jan. 2, 2008]
§ 117.484 Pass Manchac.
The draw of the Canadian National/Illinois Central Railroad automated bridge, mile 6.7, at Manchac, operates as follows:
(a) The draw is not constantly manned and the bridge will normally be maintained in the open position, providing 56 feet vertical clearance above mean high tide to the raised tip of the bascule span for one-half the channel, and unlimited vertical clearance for the other half.
(b) Railroad track circuits will detect an approaching train and initiate bridge closing warning broadcasts over marine radio and over the Public Address (PA) system six (6) minutes in advance of the train's arrival. Navigation channel warning lights will be lit, and photoelectric (infrared) boat detectors will monitor the waterway beneath the bridge for the presence of vessels. The waterway approaches to the bridge will be monitored by closed circuit TV (CCTV) cameras.
(c) Activation of the warning broadcasts also activates a marine radio monitor in the Mays Yard (New Orleans switch yard). The yardmaster will continuously monitor marine radio broadcasts on the normal and emergency marine radio channels throughout the warning period and at all times the bridge is closed. The yardmaster will communicate with waterway users via the marine radio, if necessary.
(d) At the end of warning period, if no vessels have been detected by the boat detectors, and no interruptions have been performed by the yardmaster based on his monitoring of the marine radio and the CCTV, the bridge lowering sequence will automatically proceed.
(e) Upon passage of the train, the bridge will automatically open. Railroad track circuits will initiate the automatic bridge opening and closing sequences. (Estimated duration that the bridge will remain closed for passage of rail traffic is 10 to 12 minutes.) The bridge will also be manually operable from two locked trackside control locations (key releases) on the approach spans, one on each side of the movable span.
(f) The yardmaster will be provided with a remote EMERGENCY STOP button which, if pressed, will stop the bridge operation, interrupt the lowering sequence, and immediately return the bridge to the open position. The yardmaster will utilize this control feature in the event a vessel operator issues an urgent radio call to keep the waterway open for immediate passage of the vessel.
[CGD08-93-023, 59 FR 14755, Mar. 30, 1994; 59 FR 23158, May 5, 1994, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000]
§ 117.486 Pearl River.
(a) The draw of the CSX Transportation railroad bridge, mile 1.0 near English Lookout, shall open on signal; except that, from 9 p.m. to 5 a.m. the draw shall open on signal if at least four hours notice is given.
(b) The draw of the US 90 highway bridge, mile 8.8 near Pearlington, shall open on signal; except that, from 7 p.m. to 7 a.m. the draw shall open on signal if at least four hours notice is given.
[CGD8-92-09, 57 FR 34868, Aug. 7, 1992, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998. Redesignated by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.487 Pierre Pass.
The draw of the S70 bridge, mile 1.0 at Pierre Part, shall open on signal; except that, from 10 p.m. to 6 a.m., the draw shall open on signal if at least four hours notice is given. During the advance notice period, the draw shall open on less than four hours notice for an emergency and shall open on demand should a temporary surge in waterway traffic occur.
[CGD 08-84-07, 50 FR 24195, June 10, 1985. Redesignated by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.488 Plaquemine Bayou.
(a) The draw of the S3066 (Spur) bridge, mile 6.5 at Indian Village, shall open on signal if at least four hours notice is given.
(b) The draws of the Union Pacific railroad bridge, mile 10.5 at Plaquemine, and the S1 bridge, mile 10.5 at Plaquemine, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 08-84-01; 49 FR 28405, July 12, 1984. Redesignated by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.489 Plaquemine Brule Bayou.
The draw of the S91 bridge, mile 8.0 at Estherwood, shall open on signal from 5 a.m. to 9 p.m. if at least four hours notice is given. From 9 p.m. to 5 a.m., the draw shall open on signal if at least 12 hours notice is given.
[USCG-2008-0850, 73 FR 51362, Sept. 3, 2008]
§ 117.491 Red River.
(a) The draw of the Union Pacific Railroad bridge, mile 90.1, at Alexandria, shall open on signal if at least eight hours notice is given.
(b) The draw of the US 165 (Jackson St.) bridge, mile 88.6, at Alexandria, shall open on signal if at least eight hours notice is given; except that, from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. the draw need not be opened Monday through Friday except holidays.
(c) The draws of the bridges above mile 105.8 through mile 234.4 need not open for passage of vessels. The owner or agency controlling the bridge must restore the draw to full operation within three months if notified by the District Commander that the needs of navigation require resumed operation of the spans.
(d) When a vessel which has given notice fails to arrive at the time specified in the notice, the drawtender shall remain on duty for up to two additional hours to open the draw if that vessel appears. After that time, a new notice of the appropriate length of time is required.
[CGD08-94-026, 60 FR 7123, Feb. 7, 1995, as amended by CGD08-95-024, 61 FR 4886, Feb. 9, 1996; CGD08-96-025, 61 FR 39873, July 31, 1996; CGD8-97-037, 62 FR 52502, Oct. 8, 1997; CGD08-00-020, 65 FR 52022, Aug. 28, 2000; USCG-2017-0911, 84 FR 26766, June 10, 2019; USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
§ 117.493 Sabine River.
The draw of the Union Pacific railroad bridge, mile 19.3 near Echo shall open on signal if at least 14 days' notice is given.
[USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
§ 117.494 Schooner Bayou Canal.
The draw of the S82 bridge, mile 4.0 from White Lake at Little Prairie Ridge, shall open on signal; except that, from 10 p.m. to 6 a.m. the draw shall open on signal if at least four hours notice is given. The draw shall open on less than four hours notice for an emergency and shall open on signal should a temporary surge in waterway traffic occur.
[CGD 8-85-11, 50 FR 37175, Sept. 12, 1985]
§ 117.497 Stumpy Bayou.
The removable span of the Louisiana highway bridge, mile 1.0 near Weeks Island, shall be removed for the passage of vessels if at least six days notice is given.
§ 117.500 Tchefuncta River.
The draw of the SR 22 Bridge, mile 2.5, at Madisonville, LA shall operate according to the following schedule. On Monday through Friday the draw will operate as follows: From 6 p.m. to 5:59 a.m. the draw will open on signal; from 6 a.m. to 7:59 a.m. the draw need not open; from 8 a.m. to 4 p.m. the draw will open on signal on the hour; from 4:01 p.m. to 6 p.m. the draw need not open. On Saturday and Sunday the draw will operate as follows: From 6 p.m. to 6 a.m. the draw will open on signal; from 6 a.m. to 6 p.m. the draw will open on signal on the hour.
[USCG-2016-0963, 87 FR 12861, Mar. 8, 2022]
§ 117.501 Teche Bayou.
(a) The draws of the following bridges shall open on signal if at least four hours notice is given:
(1) St. Mary Parish bridge, mile 3.9 at Calumet.
(2) St. Mary Parish bridge, mile 11.8 at Centerville.
(3) S3069 bridge, mile 16.3 at Franklin.
(4) S322 bridge, mile 17.2 at Franklin.
(5) S323 bridge, mile 22.3 at Oaklawn.
(6) St. Mary Parish bridge, mile 27.0 at Baldwin.
(7) S324 bridge, mile 32.5 at Charenton.
(8) S670 bridge, mile 37.0 at Adeline.
(9) St. Mary Parish bridge, mile 38.9 at Sorrel.
(10) S671 bridge, mile 41.8 at Jeanerette.
(11) S3182 bridge, mile 43.5 at Jeanerette.
(12) LSU Agri bridge, mile 46.5 near Jeanerette (notice required for opening from 7 a.m. to 5 p.m., Monday through Friday except holidays).
(13) S320 bridge, mile 48.7 at Olivier.
(14) S3195 bridge, mile 50.4 at New Iberia.
(15) S87 Spur bridge, mile 52.5 at New Iberia.
(16) S86 bridge, mile 53.0 at New Iberia.
(17) S3156 bridge, mile 53.3 at New Iberia.
(18) S44 bridge, mile 56.7 at Morbihan.
(19) Iberia Parish bridge, mile 58.0 at New Iberia.
(20) Iberia Parish bridge, mile 60.7 at Vida.
(21) S344 bridge, mile 62.5 at Loreauville.
(22) S86 bridge, mile 69.0 at Daspit.
(23) S92 bridge, mile 73.3 at St. Martinville.
(b) The draws of the S96 bridge, mile 75.2 at St. Martinville, and the S350 bridge, mile 82.0 at Parks, shall open on signal if at least 24 hours notice is given.
(c) The draw of the S31 bridge, mile 90.5, at Breaux Bridge shall open on signal if at least 48 hours notice is given.
(d) The draws of the bridges listed in paragraph (a) of this section shall open on less than four hours notice for an emergency during the advance notice period, and shall open on signal should a temporary surge in waterway traffic occur.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 08-83-04, 49 FR 35936, Sept. 13, 1984; CGD 8-85-16, 50 FR 50164, Dec. 9, 1985; CGD8-86-09, 52 FR 3225, Feb. 3, 1987; CGD8-89-12, 54 FR 53056, Dec. 27, 1989; CGD08-93-015, 58 FR 43264, Aug. 16, 1993; USCG-1998-3799, 63 FR 35527, June 30, 1998; CGD08-03-032, 68 FR 55006, Sept. 22, 2003; USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
§ 117.503 Tensas River.
The draw of the S15 bridge, mile 27.3 at Clayton shall open on signal if at least 48 hours notice is given.
[USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
§ 117.505 Terrebonne Bayou.
(a) The draw of the S58 bridge, mile 22.2 at Montegut, and the draw of the S55 bridge, mile 27.3 at Klondyke, shall open on signal; except that from 9 p.m. to 5 a.m. the draws shall open on signal if at least four hours notice is given.
(b) The draw of the St. Ann bridge, mile 28.8 at Bourg, shall open on signal if at least 24 hours notice is given.
(c) The draw of the S3087 bridge, mile 33.9 at Houma, shall open on signal; except that, from 5 p.m. to 9 a.m. the draw shall open on signal if at least four hours notice is given.
(d) The draws of the Howard Avenue bridge, mile 35.0, and the Daigleville bridge, mile 35.5, at Houma, shall open on signal; except that, the draws need not open for the passage of vessels Monday through Friday, except holidays from 7 a.m. to 8:30 a.m. and 4:30 p.m. to 6 p.m. From 10 p.m. to 6 a.m., the draws shall open on signal if at least four hours notice is given.
(e) During advance notice periods, the draws of the bridges listed in this section shall open on less than four hours notice for an emergency and shall open on signal should a temporary surge in waterway traffic occur.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 08-84-09, 50 FR 7586, Feb. 25, 1985; CGD8-89-02, 54 FR 27642, June 30, 1989; CGD8-89-02, 54 FR 34769, Aug. 22, 1989; CGD8-93-03, 58 FR 29973, May 25, 1993; CGD08-01-003, 66 FR 52687, Oct. 17, 2001; CGD08-04-028, 69 FR 49813, Aug. 12, 2004; USCG-2013-1072, 79 FR 8273, Feb. 12, 2014]
§ 117.507 Tigre Bayou.
The draw of the S330 bridge, mile 2.3 near Delcambre, shall open on signal if at least four hours notice is given. The draw shall open on less than four hours notice for an emergency and shall open on signal should a temporary surge in waterway traffic occur.
[CGD 8-85-08, 50 FR 52774, Dec. 26, 1985]
§ 117.509 Vermilion River.
(a) The draw of the S82 bridge, mile 22.4 at Perry, shall open on signal; except that, from 9 p.m. to 5 a.m. the draw shall open on signal if at least four hours notice is given.
(b) The draws of the following bridges shall open on signal; except that, from 6 p.m. to 10 a.m. the draws shall open on signal if at least four hours notice is given:
(1) S14 bridge, mile 25.4 at Abbeville.
(2) S14 Bypass bridge, mile 26.0 at Abbeville.
(3) Vermilion Parish bridge, mile 34.2 near Milton.
(4) S92 bridge, mile 37.6 at Milton.
(c) The draws of the following bridge shall open on signal if at least four hours notice is given:
(1) S733, mile 41.0 at Eloi Broussard.
(2) S3073 bridge, mile 44.9 at New Flanders.
(3) S182 bridge, mile 49.0 at Lafayette.
(d) During the advance notice periods, the draws of the bridges listed in this section shall open on less than four hours notice for an emergency and shall open on signal should a temporary surge in waterway traffic occur.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 08-83-05, 49 FR 31868, Aug. 9, 1984; CGD 8-85-13, 50 FR 40832, Oct. 7, 1985]
§ 117.511 West Pearl River.
The draw of the US 90 bridge, mile 7.9 near Pearlington, shall open on signal if at least four hours notice is given.
[USCG-2014-0197, 79 FR 33863, June 13, 2014]
80 Maine
§ 117.523 Back River.
The draw of the Barter's Island Bridge, mile 2.0, between Hodgdon and Barters Island at Boothbay, shall open on signal from June 1 through October 31; except that, from 5 p.m. to 8 a.m., the draw shall be opened on signal if notice was given to the drawtender from 8 a.m. to 5 p.m. From November 1 through May 31 the draw shall open on signal if at least 24 hours notice is given to the drawtender or to the Maine Department of Transportation at Augusta.
[USCG-2018-0874, 84 FR 30879, June 28, 2019]
§ 117.525 Kennebec River.
The draw of the Carlton Bridge, mile 14.0, between Bath and Woolwich shall operate as follows:
(a) From May 15 through September 30 the draw shall open on signal; except that, from 5 p.m. to 8 a.m., the draw shall open on signal if a two-hour notice is given by calling the number posted at the bridge.
(b) From October 1 through May14 the draw shall open on signal; except that, from 5 p.m. to 8 a.m., the draw shall open on signal after a twenty-four hours notice is given from 8 a.m. to 5 p.m., on Saturday and Sunday, after an eight-hour notice is given by calling the number posted at the bridge.
[USCG-2016-0344, 81 FR 36167, June 6, 2016]
§ 117.531 Piscataqua River.
(a) The following requirements apply to all bridges across the Piscataqua River:
(1) Public vessels of the United States, commercial vessels over 100 gross tons, inbound ferry service vessels and inbound commercial fishing vessels must be passed through the drawspan of each drawbridge as soon as possible. The opening signal from these vessels is four or more short blasts of a whistle, horn or a radio request.
(2) The owners of these bridges shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 18 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(3) Trains and locomotives shall be controlled so that any delay in opening the draw shall not exceed five minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, that train may continue across the bridge and must clear the bridge interlocks before stopping.
(4) Except as provided in paragraphs (b) through (c) of this section the draws shall open on signal.
(b) The draw of the Memorial (US 1) bridge, mile 1.9, shall open on signal; except that from 15 May through 31 October, from 7 a.m. to 7 p.m., the draw need be opened only on the hour and half hour for recreational vessels and commercial vessels less than 100 gross tons except as provided in (a)(1).
(c) The draw of the Sarah M. Long (Route 1 Bypass) bridge, mile 2.5, shall open as follows:
(1) The main ship channel draw shall open on signal; except that from 15 May through 31 October, from 7 a.m. to 7 p.m., the draw need be opened only at quarter of and quarter after the hour for recreational vessels and commercial vessels less than 100 gross tons except as provided in (a)(1).
(2) [Reserved]
[CGD1-89-111, 55 FR 13275, Apr. 10, 1990, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006; USCG-2014-0410, 79 FR 38433, July 7, 2014; USCG-2018-0443, 83 FR 30039, June 27, 2018]
§ 117.533 Sheepscot River.
The draw of the Maine Central Railroad Bridge, mile 15.0, between Wiscasset and North Edgecombe, Maine, need not be opened for the passage of vessels. The draw of the Maine Central Railroad Bridge shall be returned to operable condition within six months after notification by the District Commander to do so.
[CGD01-97-128, 63 FR 18323, Apr. 15, 1998]
§ 117.537 Townsend Gut.
The draw of the Southport (SR27) Bridge, at mile 0.7, across Townsend Gut between Boothbay Harbor and Southport, Maine shall open on signal; except that, from April 29 through September 30, between 6 a.m. and 6 p.m., the draw shall open on signal on the hour and half hour only, after an opening request is given.
[CGD01-06-019, 71 FR 47098, Aug. 16, 2006]
81 Maryland
§ 117.543 Bear Creek.
(a) The draw of the Peninsula Parkway Bridge, mile 2.1, between Dundalk and Sparrows Point, shall open on signal; except that, from April 16 through November 15 from 12 midnight to 8 a.m. except Saturdays and Sundays, and Federal and State holidays, at least one half hour notice is required.
(b) The draw of the Baltimore County highway bridge, mile 3.4 at Wise Avenue between Dundalk and Sparrows Point, shall open on signal if at least four hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2011-0816, 76 FR 65120, Oct. 20, 2011]
§ 117.547 Bush River.
The draw of the Amtrak Bridge, mile 6.8 at Perryman, shall operate as follows:
(a) Shall open twice a day from May 1 through October 31, on Saturdays, Sundays, and Federal holidays that fall on a Friday or a Monday, when a proper request has been received.
(b) Request for an opening is given to the Amtrak Assistant Division Engineer at 410-642-1588 and or email at BridgeOpeningRequest@Amtrak.com by an authorized representative of the Bush River Yacht Club no later than noon on the Friday just preceding the day of opening or, if that Friday is a Federal holiday, no later than noon on the preceding Thursday.
(c) Amtrak determines the times for openings and shall schedule the times:
(1) During daylight hours, six to ten hours apart; and
(2) One opening before noon and one after noon.
(3) In emergent situations after notification is given to the numbers indicated in paragraph (b) of this section it can take up to six hours for the bridge to open.
(d) Amtrak shall notify a representative of the Bush River Yacht Club of the times of all openings for the weekend (or extended weekend) in question no later than 6 p.m., on the Friday just preceding the weekend or, if that Friday is a Federal holiday, no later than 6 p.m., on the preceding Thursday.
(e) Each opening shall be of sufficient duration to pass waiting vessels.
(f) At all other times the draw need not open for the passage of vessels.
[USCG-2013-0972, 79 FR 30728, May 29, 2014]
§ 117.549 Cambridge Harbor.
The draw of the S342 bridge, mile 0.1 at Cambridge, shall open on signal from 6 a.m. to 8 p.m.; except that, from 12 noon to 1 p.m. Monday through Friday, the draw need not be opened. The draw need not be opened from 8 p.m. to 6 a.m.
§ 117.551 Chester River.
The draw of the S213 Bridge, mile 26.8, at Chestertown, shall open on signal if at least six hours notice is given.
[USCG-2009-0796, 75 FR 10174, Mar. 5, 2010]
§ 117.553 Choptank River.
(a) The draw of the Maryland 331 bridge, mile 35.3, at Dover, shall open on signal from 6 a.m. to 6 p.m., year-round, and the draw shall remain closed from 6 p.m. to 6 a.m., year-round, unless 24 hours advance notice is given by calling (301) 820-8592 or (301) 745-2096.
(b) The draw of the Conrail bridge, mile 50.9 at Denton, shall open on signal from May 30 through September 30 from sunrise to sunset and at all other times if at least four hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD5-90-059, 55 FR 35622, Aug. 31, 1990]
§ 117.557 Curtis Creek.
The draw of the I695 bridge, mile 1.0 at Baltimore, shall open on signal if at least a one-hour notice is given to the Maryland Transportation Authority in Baltimore.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2010-0351, 75 FR 49411, Aug. 13, 2010]
§ 117.559 Isle of Wight (Sinepuxent) Bay.
The draw of the US 50 Bridge, mile 0.5, at Ocean City, shall open on signal, except:
(a) From October 1 through April 30, from 6 p.m. to 6 a.m., the draw shall open if notice has been given to the bridge tender before 6 p.m.
(b) From May 25 through September 15, from 9:25 a.m. to 9:55 p.m., the draw shall open at 25 minutes after and 55 minutes after the hour for a maximum of five minutes to let accumulated vessels pass, except that on Saturdays, from 1 p.m. to 5 p.m., the draw shall open on the hour for all waiting vessels and shall remain in the open position until all waiting vessels pass.
(c) On July 4, the draw need not open from 10 p.m. until 11 p.m. to accommodate the annual July 4th fireworks show. Should inclement weather prevent the fireworks event from taking place as planned, the draw need not open from 10 p.m. until 11 p.m. on July 5th to accommodate the annual July 4th fireworks show.
[USCG-2010-0612, 76 FR 23187, Apr. 26, 2011, as amended by USCG-2011-0697, 76 FR 70348, Nov. 14, 2011; USCG-2013-1021, 79 FR 35683, June 24, 2014]
§ 117.561 Kent Island Narrows.
The draw of the U.S. Route 50/301 bridge, mile 1.0, Kent Island Narrows, operates as follows:
(a) From November 1 through April 30, the draw shall open on signal from 6 a.m. to 6 p.m. but need not be opened from 6 p.m. to 6 a.m.
(b) From May 1 through October 31, the draw shall open on signal on the hour and half-hour from 6 a.m. to 9 p.m., but need not be opened from 9 p.m. to 6 a.m.
(c) The draw shall open on signal for public vessels of the United States, state and local government vessels used for public safety purposes, and vessels in distress. Operational information will be available 24 hours a day by calling 1-800-543-2515.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD5-87-055, 53 FR 9888, Mar. 28, 1988; CGD05-05-019, 70 FR 38595, July 5, 2005]
§ 117.563 Marshyhope Creek.
The draw of the S14 bridge, mile 5.8 at Brookview, need not be opened for the passage of vessels. The operating machinery shall be maintained in a serviceable condition.
§ 117.565 Miles River.
The draw of the Route S370 bridge, mile 10.0 at Easton, Maryland, shall open on signal; except that from November 1 through March 31, 24 hours a day, and from April 1 through October 31, from 6 p.m. to 6 a.m., a six-hour advance notice to the drawtender is required for bridge openings.
[CGD05-99-003, 64 FR 61209, Nov. 10, 1999]
§ 117.566 Patapsco River—Middle Branch.
(a) The draw of the Hanover Street S2 bridge, mile 12.0 across the Middle Branch of the Patapsco River at Baltimore, will open on signal from 5 a.m. to 6:30 a.m., 9:30 a.m. to 4 p.m., and 6 p.m. to 9:00 p.m. The draw need not be opened from 6:30 a.m. to 9:30 a.m. and 4 p.m. to 6 p.m.; however, fire boats, police boats, and other vessels engaged in emergency operations will be passed immediately during this period. When a vessel desires to pass the draw from 9 p.m. to 5 a.m., notice will be given to the superintendent of the bridge, either at the bridge before 9 p.m. or at the superintendent's residence after 9 p.m. If the notice is given from 5 a.m. to 9 p.m. or if at least one half hour has elapsed since the notice was given, the draw will open promptly at the time requested.
(b) The draw of the Western Maryland railroad bridge, mile 12.5 across the Middle Branch of the Patapsco River at Baltimore, shall open on signal from 7 a.m. to 12 noon and 1 p.m. to 4 p.m. Monday through Friday except legal holidays. At all other times, the draw shall open if at least six hours notice is given. Marine firefighting equipment and pollution control vessels shall be passed as soon as possible but in no event more than 15 minutes after notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984. Redesignated and amended by USCG-2012-0306, 77 FR 37314, June 21, 2012]
§ 117.567 Patuxent River.
The draw of S231 bridge, mile 18.5 at Benedict, shall open on signal; except that, from 6 p.m. to 6 a.m., the draw shall open on signal if notice is given to the Toll Captain at the Administration Building at the east end of the bridge before 6 p.m.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984]
§ 117.569 Pocomoke River.
(a) The Conrail railroad bridge, mile 15.2, at Pocomoke City, shall open on signal, except between November 1 and March 31 the draw must open only if at least five hours advance notice is given to the bridge operator (Delmarva Central Railroad Company) by calling 1-802-774-0305.
(b) The draw of the Route 675 bridge, mile 15.6, at Pocomoke City, shall open on signal, except between November 1 and March 31 the draw must open only if at least five hours advance notice is given.
(c) The draw of the S12 bridge, mile 29.9, at Snow Hill, shall open on signal if at least five hours advance notice is given.
[CGD5-87-063, 53 FR 16548, May 10, 1988, as amended by USCG-2020-0304, 85 FR 58278, Sept. 18, 2020]
§ 117.570 Sassafras River.
The draw of the Sassafras River (Route 213) bridge, mile 10.0 at Georgetown, Maryland, shall open on signal; except that from November 1 through March 31, from midnight to 8 a.m., the draw need only open if at least a six-hour advance notice is given.
[CGD05-99-006, 64 FR 61207, Nov. 10, 1999]
§ 117.571 Spa Creek.
The S181 bridge, mile 0.4, at Annapolis, Maryland:
(a) From May 1 to October 31, Monday through Friday, except Federal and State holidays:
(1) The draw shall remain closed from 7:30 a.m. to 9:00 a.m. and from 4:30 p.m. to 7:30 p.m., except the draw shall open at 6:00 p.m. and 7:00 p.m. for any vessels waiting to pass.
(2) The draw shall open on the hour and the half-hour, from 9:00 a.m. to 4:30 p.m.
(3) The draw shall open on the hour and half hour, from 7:30 p.m. to 7:30 a.m.
(b) From November 1 to April 30, Monday through Friday, except Federal and State holidays:
(1) The draw shall remain closed from 7:30 a.m. to 9:00 a.m. and from 4:30 p.m. to 6:00 p.m.
(2) The draw shall open on signal from 9:00 a.m. to 4:30 p.m. and from 6:00 p.m. to 7:30 a.m.
(c) On Saturdays, Sundays, and holidays year-round, the draw shall open on the hour and half-hour for vessels waiting to pass. Except on July 4th of every year from 8:30 p.m. to 11 p.m., the draw need not open for vessels, and in the event of inclement weather, the alternate date is July 5th.
(d) The drawspan must always open on signal for public vessels of the United States.
[CGD5-90-002, 55 FR 4604, Feb. 9, 1990, as amended by CGD05-94-08, 59 FR 44316, Aug. 29, 1994; CGD05-04-052, 69 FR 63066, Oct. 29, 2004; USCG-2001-10881, 71 FR 70311, Dec. 4, 2006; USCG-2012-0306, 77 FR 37314, June 21, 2012]
§ 117.573 Stoney Creek.
The draw of the Stoney Creek (S173) bridge, mile 0.9, in Riviera shall open on signal, except:
(a) From 6:30 a.m. to 9 a.m. and from 3:30 p.m. to 6:30 p.m., Monday through Friday except Federal and State holidays, the draw need be opened only at 7:30 a.m. and 5 p.m. if any vessels are waiting to pass.
(b) From 11 a.m. to 7 p.m. on Saturday and from 12 p.m. to 5 p.m. on Sunday, the draw need be opened only on the hour and half hour.
(c) Public vessels of the United States must be passed as soon as possible.
[CGD5-92-012, 57 FR 14643, Apr. 22, 1992, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.575 Susquehanna River.
The draw of the Conrail bridge, mile 1.0 at Havre de Grace, shall open on signal if at least 24 hours notice is given.
§ 117.577 Weems Creek.
The draw of the S437 bridge, mile 0.7 at West Annapolis, shall open on signal from sunrise to sunset from May 1 through September 30. At all other times, the draw shall open on signal if at least five hours notice is given.
§ 117.579 Wicomico River (North Prong).
The draws of the Main Street and U.S. 50 bridges, mile 22.4, Salisbury, Maryland shall open on signal if at least four hours notice is given by calling the telephone contact number at (410) 430-7461.
[CGD05-07-025, 72 FR 42307, Aug. 2, 2007]
82 Massachusetts
§ 117.585 Acushnet River.
(a) The New Bedford-Fairhaven RT-6 Bridge, mile 0.0 will be opened promptly, provided proper signal is given, on the following schedule:
(1) On the hour between 6 a.m. and 10 a.m. inclusive.
(2) At a quarter past the hour between 11:15 a.m. and 6:15 p.m. inclusive.
(3) At all other times on call.
(b) The draw will be opened at any time for vessels whose draft exceeds 15 feet, for vessels owned or operated by the U.S. Government, the State of Massachusetts, or by local authorities.
(c) Each opening of the draw, from the time vehicular traffic flow is stopped until the flow resumes, shall not exceed 15 minutes except for vessels whose draft exceeds 15 feet or in extraordinary circumstances.
(d) From 6 p.m. on December 24 to midnight on December 25 and from 6 p.m. on December 31 to midnight on January 1, the draw shall open on signal if at least a two-hour notice is given by calling the number posted at the bridge.
[CGD 1-84-10R, 49 FR 36841, Sept. 20, 1984, as amended by CGD01-00-135, 65 FR 38207, June 20, 2000; USCG-2013-0397, 78 FR 39174, July 1, 2013; USCG-2016-0058, 81 FR 8843, Feb. 23, 2016]
§ 117.586 Annisquam River and Blynman Canal.
The draw of the Blynman (SR127) Bridge shall open on signal, except that, from noon to 6 p.m. on Thanksgiving Day, 6 p.m. on December 24 to midnight on December 25, and from 6 p.m. on December 31 to midnight on January 1, the draw shall open on signal if at least a two-hour advance notice is given by calling the number posted at the bridge.
[CGD01-04-096, 69 FR 67058, Nov. 16, 2004]
§ 117.587 Apponagansett River.
(a) The draw of the Padanaram Bridge, mile 1.0, shall open on signal from 1 May through 31 October, between 6 a.m. and 9 p.m., daily, as follows:
(1) The bridge shall open on signal, twice an hour, on the hour and half hour between 6 a.m. and 9 a.m. and between 8 p.m. and 9 p.m.
(2) The bridge shall open on signal, once an hour, on the hour between 9 a.m. and 8 p.m.
(b) At all other times the bridge shall open if at least four (4) hours advance notice is given.
(c) The owners of this bridge shall provide and maintain mooring facilities for vessels to make fast while waiting for the bridge to open.
(d) The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained according to the provisions of section 118.160 of this chapter.
[CGD01-95-008, 60 FR 29761, June 6, 1995, as amended at USCG-2011-0335, 76 FR 64010, Oct. 17, 2011]
§ 117.588 Bass River.
The Hall Whitaker Bridge, mile 0.6 at Beverly, shall operate as follows:
(a) Public vessels of the United States must be passed as soon as possible.
(b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(c) That the drawspan for the Hall Whitaker Drawbridge must open on signal if at least 24 hours notice is given.
[CGD1-91-015, 56 FR 41460, Aug. 21, 1991, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.589 Cape Cod Canal.
The draw of the Conrail railroad bridge, mile 0.7 at Bourne, shall operate as follows:
(a) The draw is normally in the fully open position except for the passage of trains or for maintenance. No signal is required if the draw is in the fully open position.
(b) If the draw is not in the fully open position, the opening signal is one prolonged and one short blast.
(c) Signals to be sounded from the bridge are—
(1) Immediately preceding the opening of the draw, one prolonged blast;
(2) Immediately preceding the closing of the draw, two prolonged blasts;
(3) When a vessel has sounded the opening signal and the draw cannot be opened immediately, five short blasts in a rapid succession; and
(4) When the draw is closed and visibility is reduced in foggy weather, five short blasts in rapid succession every two minutes.
§ 117.591 Charles River and its tributaries.
(a) The following requirements apply to all bridges across the Charles River and it's tributaries:
(1) Public vessels of the United States, state or local vessels used for public safety, and vessels in distress shall be passed through the draw of each bridge as soon as possible without delay at any time. The opening signal from these vessels is four or more short blasts of a whistle or horn, or a radio request.
(2) The owners of these bridges shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(3) Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed ten minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, that train may continue across the bridge and must clear the bridge interlocks before stopping.
(4) Except as provided in paragraph (b) through (f) of this section, the draws shall open on signal.
(b) The draw of the Massachusetts Bay Transportation Authority (MBTA/Amtrak Bridge, mile 0.8, at Boston, shall open on signal; except that from 6:15 a.m. to 9:10 a.m. and 4:15 p.m. to 6:30 p.m., Monday through Friday, except holidays, the draw need not be opened for the passage of vessels, except as stated in paragraph (a)(1) of this section.
(c) The draw of the Massachusetts Bay Transportation Authority (East Cambridge Viaduct) railroad Bridge, mile 1.0 at Boston, need not be opened for the passage of vessels. However, the operating machinery of the draw shall be maintained in an operable condition.
(d) The draw of the Massachusetts Department of Transportation (Craigie) Bridge, mile 1.0 at Boston, shall operate as follows:
(1) Open on signal; except that from 6:15 a.m. to 9:10 a.m. and 3:15 p.m. to 6:30 p.m., Monday through Friday, except holidays, the draw need not open for the passage of vessels, except as stated in paragraph (a)(1) of this section.
(2) From December 1 to March 31, the draw shall open on signal after a 24 hour advance notice is given.
(3) From midnight to 8 a.m., April, May, October, and November, the draw shall open on signal after at least an eight-hour advance notice is given.
(e) The draws of the bridges across Broad Canal, mile 0.0, need not open for the passage of vessels. However, the draws shall be returned to operable condition within one year after notification by the District Commander to do so.
[CGD1 91-141, 57 FR 30405, July 9, 1992, as amended by CGD01-02-026, 68 FR 59116, Oct. 14, 2003; USCG-2015-0433, 80 FR 44281, July 27, 2015; USCG-2018-0443, 83 FR 30039, June 27, 2018]
§ 117.593 Chelsea River.
(a) All drawbridges across Chelsea River shall open on signal. The opening signal for each drawbridge is two prolonged blasts followed by two short blasts and one prolonged blast. The acknowledging signal is three prolonged blasts when the draw can be opened immediately and is two prolonged blasts when the draw cannot be open or is open and must be closed.
(b) The draw of the Chelsea Street Bridge, mile 1.3, at Chelsea, shall open as follows:
(1) The draw shall open on signal to 139 feet above mean high water for all vessel traffic unless a full bridge opening to 175 feet above mean high water is requested.
(2) The 139 foot opening will be signified by a solid green light over a flashing green light and the full 175 foot opening will be signified with two solid green range lights.
[USCG-2019-0809, 85 FR 15069, Mar. 17, 2020, as amended by USCG-2024-1103, 90 FR 52877, Nov. 24, 2025]
§ 117.595 Danvers River.
(a) The requirements in this paragraph apply to all bridges across the Danvers River:
(1) The owners of these bridges shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high, designed, installed, and maintained according to the provisions of § 118.160 of this chapter.
(2) Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed ten minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, that train may continue across the bridge and must clear the bridge interlocks before stopping.
(b) The draw of the Massachusetts Bay Transportation Authority (MBTA)/AMTRAK Bridge, at mile 0.05, between Salem and Beverly, shall open on signal; except that, from midnight to 5 a.m., daily, and on December 25 and January 1, the draw shall open as soon as possible, but not more than one hour after notice is given to the drawtenders either at the bridge during the time the drawtenders are on duty or by calling the number posted at the bridge.
(c) The Kernwood Bridge, at mile 1.0, shall operate as follows:
(1) From May 1 through September 30, midnight to 5 a.m., and from October 1 through April 30, 7 p.m. to 5 a.m., draw shall open on signal after at least a one-hour advance notice is given by calling the number posted at the bridge.
(2) From noon to 6 p.m. on Thanksgiving Day and all day on Christmas and New Years Day, the draw shall open on signal after at least a one-hour advance notice is given by calling the number posted at the bridge.
[CGD01-99-148, 64 FR 46275, Aug. 25, 1999, as amended by CGD01-04-096, 69 FR 67058, Nov. 16, 2004]
§ 117.597 Dorchester Bay.
The draw of the of the William T. Morrisey Boulevard Bridge, mile 0.0, at Boston, shall operate as follows:
(a) From 7:30 a.m. to 9 a.m. and 4:30 p.m. to 6 p.m., Monday through Friday, except holidays, the draw need not open for the passage of vessel traffic.
(b) The draw shall open on signal from April 16 through May 31, from 8 a.m. through midnight, except as provided in paragraph (a) of this section. From midnight through 8 a.m. at least an eight-hour advance notice is required for bridge openings.
(c) The draw shall open on signal at all times from June 1 through September 30, except as provided in paragraph (a) of this section.
(d) The draw shall open on signal from October 1 through October 14, 8 a.m. through midnight, except as provided in paragraph (a) of this section. From midnight through 8 a.m. at least an eight-hour advance notice is required for bridge openings.
(e) The draw shall open on signal from October 15 through April 15, after at least a 24 hours notice is given, except as provided in paragraph (a) of this section.
[CGD01-02-026, 68 FR 59116, Oct. 14, 2003]
§ 117.598 Eel Pond Channel.
The following requirements apply to the draw of Eel Pond (Water Street) drawbridge at mile 0.0 at Falmouth, Massachusetts.
(a) The draw shall open at all times as soon as possible for a public vessels of the United States, State or local vessels used for public safety, and vessels in distress. The opening signal for these vessels shall be four or more short blast of a whistle, horn, or radio request.
(b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed and maintained according to the provisions of section 118.160 of this chapter.
(c) The draw shall operate as follows:
(1) On signal from October 15 through May 14, from 8 a.m. to 5 p.m. except as provided in paragraph (c)(3)(i) of this section.
(2) Need open on signal only on the hour and half hour as follows:
(i) From May 15 through June 14 and from September 16 through October 14, from 7 a.m. to 7 p.m.
(ii) From June 15 through September 15, from 6 a.m. to 9 p.m.
(3) The draw shall open on signal if at least 8 hours advance notice is given:
(i) At all times on Christmas, New Years, Easter and all Sundays in January and February.
(ii) At all other times not stipulated in paragraphs (c)(1) and (c)(2) of this section.
[CGD1 90-024, 55 FR 20263, May 16, 1990]
§ 117.600 Lagoon Pond.
The draw of the Lagoon Pond Bridge, mile 0.0 in Tisbury, Massachusetts, shall operate as follows:
(a) The draw shall open on signal from May 15 through September 15, from 8:15 a.m. to 8:45 a.m., from 10:15 a.m. to 11 a.m., from 3:15 p.m. to 4 p.m., from 5 p.m. to 5:45 p.m., and from 7:30 p.m. to 8 p.m. At all other times the draw will open for the passage of vessels if at least four (4) hours advance notice is given by calling the number posted at the bridge.
(b) The draw shall open on signal from September 16 through May 14 if at least a twenty-four (24) hours advance notice is given by calling the number posted at the bridge.
(c) The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained according to the provisions of section 118.160 of this chapter.
[CGD01-95-001, 60 FR 51729, Oct. 3, 1995]
§ 117.603 Manchester Harbor.
The Massachusetts Bay Transportation Authority Bridge at mile 1.0 in Manchester, shall operate as follows:
(a) The draw shall open on signal—
(1) From Memorial Day through September 30 from 7 a.m. to 11 p.m.;
(2) From April 1 to Memorial Day and from October 1 to November 1 from 9 a.m. to 1 p.m. and 2 p.m. to 6 p.m.
(b) At all other times, the draw shall open on signal with at least four hours notice.
(c) The owner of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained in accordance with the provisions of section 118.160 of this chapter.
[CGD01-97-022, 62 FR 50509, Sept. 26, 1997]
§ 117.605 Merrimack River.
(a) The draw of the Newburyport US1 Bridge, mile 3.4, shall operate as follows:
(1) From May 1 through November 15, from 6 a.m. to 10 p.m., the draw shall open on signal; except that, from Memorial Day through Labor Day, from 6 a.m. to 10 p.m., the draw shall open on signal only on the hour and half hour.
(2) At all other times the draw shall open on signal after at least a one-hour advance notice is given by calling the number posted at the bridge.
(b) The drawspans for the Massachusetts Department of Transportation drawbridges, mile 5.8 at Newburyport and mile 12.6 at Rock Village, and Groveland Drawbridge, mile 16.5 at Groveland, must open on signal if at least two hours notice is given. Public vessels of the United States must be passed through the drawspans as soon as possible.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD01-94-094, 60 FR 58518, Nov. 28, 1995; CGD01-99-029, 65 FR 24640, Apr. 27, 2000; USCG-2001-10881, 71 FR 70311, Dec. 4, 2006; USCG-2015-0433, 80 FR 44281, July 27, 2015; USCG-2018-0443, 83 FR 30039, June 27, 2018]
§ 117.607 Mitchell River.
The Chatham Highway Bridge, at mile 0.2, at Chatham, Massachusetts, shall operate as follows:
(a) From May 1 through October 31, the draw shall open on signal from 8 a.m. to 5 p.m., if at least one-hour notice is given and from 5 p.m. to 8 a.m. the draw shall open on signal if at least 12-hours notice is given by calling the Chatham Harbormasters Department.
(b) From November 1 through April 30, the draw shall open on signal if at least a 24-hours advance notice is given by calling the Chatham Harbormasters Department.
[CGD01-05-006, 70 FR 32235, June 2, 2005]
§ 117.609 Mystic River.
The draw of the S99 Alford Street Bridge, mile 1.4, shall open on signal; except that, Monday through Saturday, excluding holidays, the draw need not open for the passage of vessel traffic from 7:45 a.m. to 9 a.m., 9:10 a.m. to 10 a.m., and 5 p.m. to 6 p.m., daily. From November 1 through March 31, between 3 p.m. and 7 a.m., at least an eight-hour advance notice is required for bridge openings by calling the number posted at the bridge.
[USCG-2018-0443, 83 FR 30039, June 27, 2018]
§ 117.611 Neponset River.
The Granite Avenue Bridge, mile 2.5, between Boston and Milton, Massachusetts, shall operate as follows:
(a) The draw of the Granite Avenue Bridge shall open on signal from May 1 through October 31; 6 a.m. to 12 midnight. At all other times the draw shall open on signal if at least one hour advance notice is given by calling the number posted at the bridge.
(b) The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
[CGD01-94-087, 60 FR 54432, Oct. 24, 1995]
§ 117.615 Plum Island River.
The draw of the Plum Island Turnpike Bridge, mile 3.3 between Newburyport and Plum Island, shall operate as follows:
(a) From April 1 through November 30, 5 a.m. to 9 p.m., the draw shall open on signal if at least one hour advance notice is given by calling the number posted at the bridge. At all other times the draw shall open on signal if at least three hours advance notice is given.
(b) The owners of this bridge shall provide and keep in good legible condition, clearance gauges for each draw with figures not less than twelve (12) inches high, designed, installed and maintained according to the provisions of § 118.160 of this chapter.
[CGD01-94-057, 60 FR 54431, Oct. 24, 1995]
§ 117.618 Saugus River.
(a) The following requirements apply to all bridges across the Saugus River:
(1) Public vessels of the United States, state or local vessels used for public safety, and vessels in distress shall be passed through the draw of each bridge as soon as possible at any time. The opening signal from these vessels is four or more short blasts of a whistle or horn or a radio request.
(2) The owners of these bridges shall provide and keep in good legible condition clearance gauges with figures not less than 12 inches high designed, installed and maintained according to provisions of § 118.160 of this chapter.
(3) Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed seven minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks before stopping.
(b) The draw of the General Edwards SR1A Bridge, mile 1.7, between Revere and Lynn, shall open on signal at all times if at least a two-hour advance notice is given by calling the number posted at the bridge.
(c) The Fox Hill (SR107) Bridge, at mile 2.5, shall operate as follows:
(1) The draw shall open on signal, except that, from October 1 through May 31, from 7 p.m. to 5 a.m., the draw shall open after at least a one-hour advance notice is given by calling the number posted at the bridge.
(2) From noon to 6 p.m. on Thanksgiving Day, and all day on Christmas, and New Years Day, the draw shall open on signal after at least a one-hour advance notice is given by calling the number posted at the bridge.
[CGD1 91-004, 56 FR 60064, Nov. 27, 1991, as amended by CGD01-94-150, 60 FR 51730, Oct. 3, 1995; GD01-02-026, 68 FR 59116, Oct. 14, 2003; CGD01-04-096, 69 FR 67058, Nov. 16, 2004; USCG-2014-0272, 79 FR 60977, Oct. 9, 2014]
§ 117.619 Taunton River.
(a) The Brightman Street (Route-6) Bridge at mile 1.8, between Fall River and Somerset, shall operate as follows:
(b) The draw shall open on signal between 5 a.m. and 9 p.m., daily. From 9 p.m. through 5 a.m. the draw shall open on signal after at least a one-hour advance notice is given by calling the number posted at the bridge.
(c) From June 1 through August 31, the draw need not open for the passage of pleasure craft from 7 a.m. to 9:30 a.m. and from 4 p.m. to 6:30 p.m., Monday through Friday, except holidays. The draw shall open for commercial vessels at all times.
(d) From 6 p.m. on December 24 to midnight on December 25, and from 6 p.m. on December 31 to midnight on January 1, the draw shall open on signal if at least a two-hour advance notice is given by calling the number posted at the bridge.
(e) The owner of the bridge shall provide and keep in good legible condition clearance gauges located on both upstream and downstream sides of the draw with figures not less than twelve inches in height, designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(f) The draw of the Veterans Memorial Bridge, mile 2.1, across the Taunton River between Fall River and Somerset, shall operate as follows:
(1) From 7 a.m. through 3 p.m. the draw shall open on signal.
(2) From 3 p.m. through 7 a.m. the draw shall open on signal provided a two hour advance notice is given by calling the number posted at the bridge.
[USCG-2010-0234, 75 FR 51940, Aug. 24, 2010, as amended by USCG-2013-0291, 78 FR 49920, Aug. 16, 2013]
§ 117.620 Westport River—East Branch.
The Westport Point Bridge, mile 1.2 at Westport, shall operate as follows:
(a) Public vessels of the United States must be passed as soon as possible.
(b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed, and maintained, according to the provisions of § 118.160 of this chapter.
(c) That the drawspan for the Westport Point Drawbridge, mile 1.2 at Westport, must open on signal if at least 24 hours notice is given.
[CGD1-91-014, 56 FR 41462, Aug. 21, 1991, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.621 West Bay.
The draw of the West Bay Bridge, mile 1.2, at Osterville, shall operate as follows:
(a) From November 1 through April 30, the draw shall open on signal if at least a twenty-four hours advance notice is given.
(b) From May 1 through June 15, the draw shall open on signal from 8 a.m. to 6 p.m.
(c) From June 16 through September 30, the draw shall open on signal from 7 a.m. to 9 p.m.
(d) From October 1 through October 31, the draw shall open on signal from 8 a.m. to 6 p.m.
(e) At all other times from May 1 through October 31, the draw shall open on signal if at least a four-hours advance notice is given by calling the number posted at the bridge.
[USCG-2018-0874, 84 FR 30879, June 28, 2019]
§ 117.622 Weymouth Fore River.
The draw of the Quincy Weymouth SR3A bridge, mile 3.5 between Quincy Point and North Weymouth, Massachusetts, shall open on signal, except that:
(a) From 6:30 a.m. to 9 a.m. and from 4:30 p.m. to 6:30 p.m., Monday through Friday, except holidays observed in the locality, the draw need not be opened.
(b) The draw shall open on signal at all times for self-propelled vessels greater than 10,000 gross tons.
(c) From noon to 6 p.m. on Thanksgiving Day, from 6 p.m. on December 24 to midnight on December 25, and from 6 p.m. on December 31 to midnight on January 1, the draw shall open on signal after at least a two-hour advance notice is given by calling the number posted at the bridge.
[USCG-2018-0874, 84 FR 30879, June 28, 2019]
83 Michigan
§ 117.624 Black River (South Haven).
The draw of the Dyckman Avenue bridge, mile 1.9 at South Haven, shall open as follows:
(a) From May 1 through October 14—
(1) From 7 a.m. to 11 p.m., seven days a week the draw need open only on the hour and half-hour; however, Mondays through Fridays the draw need not open at 12 noon and 1 p.m. Commercial vessels shall be passed through the draw of this bridge as soon as possible even though this regulated period is in effect.
(2) From 11 p.m. to 7 a.m., no bridgetender is required to be in continuous attendance at the bridge and the draw shall open on signal for commercial vessels and pleasure craft if at least a three hour advance notice is given.
(b) From October 15 through April 30, the draw shall open on signal for the passage of commercial vessels and pleasure craft if at least a twelve hour advance notice is given.
(c) At all times, the draw shall open as soon as possible for public vessels of the United States, state or local government vessels used for public safety and vessels in distress.
[CGD 09 85-21, 51 FR 13219, Apr. 18, 1986]
§ 117.625 Black River (Port Huron).
(a) The draw of the Military Street Bridge, mile 0.33, shall open on signal; except that, from May 1 through October 31, from 8 a.m. to 11 p.m., seven days a week, the draw need open only on the hour and half-hour for recreational vessels, or at any time when there are more than five vessels waiting for an opening, and from November 1 through April 30 if at least 12-hours advance notice is given.
(b) The draw of the Seventh Street Bridge, mile 0.50, shall open on signal; except that, from May 1 through October 31, from 8 a.m. to 11 p.m., seven days a week, the draw need open only on the quarter-hour and three-quarter-hour for recreational vessels, or at any time when there are more than five vessels waiting for an opening, and from November 1 through April 30 if at least 12-hours advance notice is given.
(c) The draw of the Tenth Street Bridge, mile 0.94, shall open on signal; except that, from May 1 through October 31, from 8 a.m. to 11 p.m., seven days a week, the draw need open only on the hour and half-hour for recreational vessels, or at any time when there are more than five vessels waiting for an opening, and from 11 p.m. to 8 a.m. if at least 1-hour advance notice is provided, and from November 1 through April 30 if at least 12-hours notice is given.
(d) The draw of the Canadian National Railroad Bridge, mile 1.56, shall open on signal; except from November 1 through April 30 if at least 12-hours advance notice is given.
[USCG-2017-1047, 83 FR 10619, Mar. 12, 2018]
§ 117.627 Cheboygan River.
The draw of the US 23 highway bridge, mile 0.9 at Cheboygan shall operate as follows:
(a) From May 1 through November 31—
(1) Between the hours of 7 a.m. and 11 p.m., the draw need only open from three minutes before to three minutes after the quarter-hour and three-quarter hour.
(2) Between the hours of 11 p.m. and 7 a.m., no drawtender is required to be at the bridge and the bridge need not open unless a request to open the draw is given at least 2-hours in advance of a vessels intended time of passage through the draw.
(b) From December 1 through April 31, no drawtender is required to be at the bridge and the bridge need not open unless a request to open the draw is given at least 12-hours in advance of a vessels intended time of passage through the draw.
(c) At all times, the draw shall open as soon as possible for the passage of vessels if carrying public safety or public utility vehicles and persons to or from the island.
(d) The owner of the bridge shall provide and keep in good legible condition two board gauges painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all water levels. The gauges shall be placed on the bridge so that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
[USCG-2023-0113, 88 FR 70592, Oct. 12, 2023]
§ 117.631 Detroit River (Trenton Channel).
(a) The draw of the Grosse Ile Toll Bridge (Bridge Road), mile 8.8, at Grosse Ile, shall operate as follows:
(1) From March 16 through December 14—
(i) Between the hours of 7 a.m. and 11 p.m., seven days a week and holidays, the draw need open only from three minutes before to three minutes after the hour and half-hour for pleasure craft; for commercial vessels, during this period of time, the draw shall open on signal as soon as possible.
(ii) Between the hours of 11 p.m. and 7 a.m., the draw shall open on signal for pleasure craft and commercial vessels.
(2) From December 15 through March 15, no bridge tenders are required to be on duty at the bridge and the bridge shall open on signal if at least a twelve-hour advance notice is given.
(b) The draw of the Wayne County highway bridge (Grosse Ile Parkway), mile 5.6, at Grosse Ile, shall operate as follows:
(1) From March 16 through December 14—
(i) Between the hours of 7 a.m. and 11 p.m., seven days a week and holidays, the draw need open only from three minutes before to three minutes after the quarter and three-quarter hour for pleasure craft, with no opening required at 7:45 a.m., 8:45 a.m., 4:15 p.m. and 5:15 p.m., Monday through Friday, except holidays; for commercial vessels, during these periods of time, the draw shall open on signal as soon as possible.
(ii) Between the hours of 11 p.m. and 7 a.m., the draw shall open on signal for pleasure craft and commercial vessels.
(2) From December 15 through March 15, no bridgetenders are required to be on duty at the bridge and the bridge shall open on signal if at least a twelve-hour advance notice is given.
(c) At all times, the bridges listed in this section shall open as soon as possible for public vessels of the United States, State or local government vessels used for public safety and vessels in distress.
[CGD09 87-07, 52 FR 39520, Oct. 22, 1987, as amended by USCG-2005-21531, 70 FR 36349, June 23, 2005; USCG-2016-0988, 82 FR 15137, Mar. 27, 2017]
§ 117.633 Grand River.
(a) Public vessels of the United States, state or local vessels used for public safety, commercial vessels, and vessels in distress shall be passed through the draw of each bridge as soon as possible.
(b) The draw of the CSX Transportation Corp. railroad bridge, mile 2.8 at Grand Haven, shall open on signal; except that, from December 15 through March 15, the draw shall open on signal if at least 12 hours notice is given.
(c) The draw of the U.S. Route 31 bridge, mile 2.9 at Grand Haven, shall open on signal for pleasure craft-
(1) From March 16 through December 14, from 6:30 a.m. to 8:30 p.m., seven days a week, once an hour, on the half-hour; except the draw need not open for pleasure craft at 7:30 a.m., 12:30 p.m., and 5:30 p.m. on Monday, Tuesday, Thursday, and Friday, and at 7:30 a.m., 12:30 p.m., and 4:30 p.m. on Wednesday.
(2) From December 15 through March 15, if at least 12 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD09-97-008, 62 FR 43098, Aug. 12, 1997; USCG-2015-0373, 80 FR 34056, June 15, 2015]
§ 117.635 Keweenaw Waterway.
(a) The draw of the U.S. 41 Bridge, mile 16, shall open on signal, except that:
(1) From April 15 through December 14, between the hours of 7 a.m. and 7 p.m. Monday through Friday, less Federal holidays, the bridge shall open on signal from five minutes before to five minutes after the hour and half hour for vessels. Documented vessels over 300-feet shall not be held at the bridge but will be passed as soon as possible.
(2) From April 15 through December 14 between midnight and 4 a.m. daily, the draw shall be placed in the intermediate position and open on signal if at least 2 hours' notice is given.
(3) From December 15 through April 14 the draw shall open on signal if at least 12 hours' notice is given.
(b) [Reserved]
[USCG-2022-0237, 88 FR 59800, Aug. 30, 2023]
§ 117.637 Manistee River.
(a) The draws of the Maple Street bridge, mile 1.1, and US-31 highway bridge, mile 1.4, both at Manistee, shall operate as follows:
(1) From May 1 through October 31, between 7 a.m. to 11 p.m., the bridges shall open on signal. From 11 p.m. to 7 a.m., the bridges need not open unless notice is given at least two hours in advance of a vessel's time of intended passage through the draws.
(2) From November 1 through April 30, the bridges need not open unless notice is given at least 24 hours in advance of a vessel's time of intended passage through the draws.
(b) The CSX Transportation railroad bridge, mile 1.5, at Manistee, shall open on signal from May 1 to October 31. From November 1 to April 30, the bridge need not open unless notice is given at least 24 hours in advance of a vessel's time of intended passage through the draw.
[CGD 09-93-006, 58 FR 52442, Oct. 8, 1993, as amended by CGD09-97-014, 62 FR 43931, Aug. 18, 1997]
§ 117.641 Pine River (Charlevoix).
(a) The draw of the U.S. 31 bridge, mile 0.3 at Charlevoix, shall be operated as follows:
(1) From April 1 through December 31, the draw shall open on signal; except from 6 a.m. to 10 p.m., April 1 to October 31, the draw need open only from three minutes before to three minutes after the hour and half-hour for recreational vessels. Public vessels of the United States, state or local vessels used for public safety, commercial vessels, vessels in distress, and vessels seeking shelter from severe weather shall be passed through the draw as soon as possible.
(2) From January 1, through March 31, the draw shall open on signal if at least 12 hours advance notice is provided prior to a vessel's intended time of passage.
(b) The owner of the bridge shall provide and keep in good legible condition two board gauges painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all water levels. The gages shall be placed on the bridge so that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
[CGD09-00-001, 65 FR 15240, Mar. 22, 2000]
§ 117.643 Pine River (St. Clair).
The draw of the S29 bridge, mile 0.1 at St. Clair, shall open on signal from April 1 through November 30 from 2 a.m. to 8 a.m. and from 8 a.m. to 2 a.m. on the hour and one-half hour. From December 1 through March 31, the draw shall open on signal if at least 24 hours notice is given. Public vessels of the United States, state or local vessels used for public safety, and vessels in distress shall be passed through the draw as soon as possible.
§ 117.645 River Rouge.
(a) The Delray Connecting Railroad Bridge, mile 0.34, need not have a drawtender in continued attendance at the bridge and shall open on signal if a 4-hour advance notice is provided.
(b) The Delray Connecting Railroad Bridge, mile 0.80, over the Old Channel need not have a drawtender in continued attendance at the bridge. The bridge will remain open ten minutes before the bridge is lowered for train traffic. A crewmember from the train will initiate a SECURITE call on VHF-FM Marine Channel 16 that the bridge will be lowering for train traffic and invite any concerned mariners to contact the drawtender on VHF-FM Marine Channel 12. The drawtender will also visually monitor for vessel traffic and listen for the standard bridge opening signal of one prolonged blast and one short blast from vessels already transiting the waterway. After the ten minute warning, another SECURITE call shall be made on VHF-FM Marine Channel 16 that the bridge will be lowering for rail traffic five minutes before lowering. Once the drawtender is satisfied that it is safe, the bridge will be lowered for rail traffic. Once the rail traffic has cleared the bridge, the bridge shall be raised and locked in the fully open to navigation position.
(c) The National Steel Corporation Railroad Bridge, mile 0.40, need not have a drawtender in continual attendance at the bridge. Ten minutes before the bridge is lowered for train traffic a crewmember from the train will initiate a SECURITE call on VHF-FM Marine Channel 16 that the bridge will be lowering for train traffic and invite any concerned mariners to contact the drawtender on VHF-FM Marine Channel 12. The drawtender will also visually monitor for vessel traffic and listen for the standard bridge opening signal of one prolonged blast and one short blast from vessels already transiting the waterway. After the ten minute warning, another SECURITE call shall be made on VHF-FM Marine Channel 16 that the bridge will be lowering for rail traffic five minutes before lowering. Once the drawtender is satisfied that it is safe, the bridge will be lowered for rail traffic. Once the rail traffic has cleared the bridge, the bridge shall be raised and locked in the fully open to navigation position.
(d) The draw of the West Jefferson Avenue Bridge, mile 1.10, is required to operate a radiotelephone, and shall open on signal except from January 1 through March 31 when the bridge shall open on signal if provided a 12-hour advance notice.
(e) The draw of the Conrail Bridge, mile 1.48, is remotely operated, is required to operate a radiotelephone and telephone, and shall open on signal except from January 1 through March 31 when the bridge shall open on signal if provided a 12-hour advance notice.
(f) The draw of the Norfolk Southern Railroad Bridge, mile 1.87, is required to operate a radiotelephone and telephone, and shall open on signal except from January 1 through March 31 when the bridge shall open on signal if provided a 12-hour advance notice.
(g) The draw of the Fort Street Bridge, mile 2.20, is required to operate a radiotelephone, and shall open on signal except from January 1 through March 31 when the bridge shall open on signal if provided a 12-hour advance notice.
(h) The draw of the Dix Avenue Bridge, mile 2.73, is required to operate a radiotelephone, and shall open on signal except from January 1 through March 31 when the bridge shall open on signal if provided a 12-hour advance notice.
[USCG-2020-0513, 86 FR 19575, Apr. 14, 2021, as amended by USCG-2023-0183, 88 FR 89576, Dec. 28, 2023; 89 FR 14744, Feb. 29, 2024]
§ 117.647 Saginaw River.
(a) The draws of the Lake State Railway Bridge, mile 3.10, and the Central Michigan Railroad Bridge, mile 4.94, both in Bay City, shall open on signal; except that from January 1 through March 31, the draws shall open on signal if at least 12 hours advance notice is provided.
(b) The draws of the Independence Bridge, mile 3.88, Liberty Street Bridge, mile 4.99, Veterans Memorial Bridge, mile 5.60, and Lafayette Street Bridge, mile 6.78, all in Bay City, shall open on signal, except as follows:
(1) From April 15 through November 1, between the hours of 6:30 a.m. and 7 p.m., Monday through Friday, except federal holidays, the draws of the Independence and Veterans Memorial Bridges need open for the passage of recreational vessels only from three minutes before to three minutes after the hour and half-hour, and the Liberty Street and Lafayette Street bridges need open for the passage of recreational vessels only from three minutes before to three minutes after the quarter-hour and three-quarter hour.
(2) From January 1 through March 31, the draws of these bridges shall open on signal if at least 12 hours advance notice is provided.
(c) The draw of the CSX railroad bridge, mile 18.0, need not be opened for the passage of vessels. The owner shall return the draw to an operable condition within a reasonable time when directed by the District Commander to do so.
(d) The draw of the Grand Trunk Western railroad bridge, mile 19.2, need not be opened for the passage of vessels.
[USCG-2011-1013, 77 FR 21866, Apr. 12, 2012, as amended by USCG-2015-0433, 80 FR 44281, July 27, 2015; USCG-2015-0934, 81 FR 11119, Mar. 3, 2016]
§ 117.651 St. Joseph River.
The draws of the US33 (Blossomland) bridge, mile 0.9, and the BL-94 (Bicentennial) bridge, mile 1.3, both at St. Joseph, shall be operated as follows:
(a) From March 1 through May 14, from October 1 through December 15, and from 8 p.m. to 7 a.m. from May 15 through September 30, the draws shall open on signal.
(b) From 7 a.m. to 8 p.m. from May 15 through September 30, the draw of the Blossomland bridge need be opened only from three minutes before to three minutes after the hour and half hour, and the draw of the Bicentennial bridge need be opened only from three minutes before to three minutes after the quarter and three-quarter hour.
(c) From December 16 through the last day of February, the draw of both bridges shall open on signal if at least 12 hours notice is given.
(d) Public vessels of the United States, state and local government vessels used for public safety, commercial vessels, and vessels in distress shall be passed through the draw of both bridges as soon as possible.
§ 117.653 St. Mary's Falls Canal.
The draw of the International Railway bridge, mile 1.0 at Sault Ste. Marie, shall be maintained in the fully open position during the navigation season, except for the crossings of trains or for maintenance. Bridge operators shall not give precedence to railway traffic and shall not close the bridge against an upbound vessel after lock gates are open and the vessel is proceeding toward the bridge, nor against a downbound vessel, 1,200 feet or less west of the bridge, unless the vessel is moored at either canal pier awaiting its turn to take position at lock approaches.
§ 117.655 Thunder Bay River.
The draw of the Second Avenue bridge, mile 0.3 at Alpena, shall open on signal if at least three hours notice is given to the Dispatcher, Police Department, City of Alpena, Michigan.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984]
84 Minnesota
§ 117.661 Duluth Ship Canal (Duluth-Superior Harbor).
The draw of the Duluth Ship Canal Aerial bridge, mile 0.25 at Duluth, shall open on signal; except that, from March 16 through December 31, between the hours of 7 a.m. and 9 p.m., seven days a week, the drawbridge shall open on the hour and half-hour for vessels under 300 gross tons, if needed; and the bridge will open on signal for all vessels from 9 p.m. to 7 a.m., seven days a week, and at all times for Federal, state, and local government vessels, vessels in distress, commercial vessels engaged in rescue or emergency salvage operations, commercial-assist towing vessels engaged in towing or port operations, vessels engaged in pilot duties, vessels seeking shelter from severe weather, and all commercial vessels 300 gross tons or greater. From January 1 through March 15, the draw shall open on signal if at least 12 hour notice is given. The opening signal is one prolonged blast, one short blast, one prolonged blast, one short blast. If the drawbridge is disabled, the bridge authorities shall give incoming and outgoing vessels timely and dependable notice, by tug service if necessary, so that the vessels do not attempt to enter the canal.
[USCG-2018-0181, 83 FR 54246, Oct. 29, 2018]
§ 117.664 Rainy River, Rainy Lake and their tributaries.
The draw of the Canadian National Railroad Bridge, mile 85.0, at Ranier, MN may operate remotely, and shall open on signal; except that, from October 16 to April 30, the draw shall open on signal if at least 12-hours advance notice is provided. The commercial phone number to provide advance notice shall be posted on the bridge so that it is plainly visible to vessel operators approaching the up or downstream side of the bridge. The owners of the bridge shall provide and keep in good legible condition two board gauges painted white with black figures to indicate the vertical clearance under the closed draw at all water levels. The gauges shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream. The bridge shall operate and maintain a VHF-FM Marine Radio.
[USCG-2020-0033, 86 FR 53218, Sept. 27, 2021, as amended by USCG-2022-0323, 88 FR 10029, Feb. 16, 2023]
§ 117.665 Red River of the North.
The draws of the bridges need not be opened for the passage of vessels.
§ 117.667 St. Croix River.
(a) The draws of the Burlington Northern Santa Fe Railroad Bridge, Mile 0.2, the Prescott Highway Bridge, Mile 0.3, and the Hudson Railroad Bridge, Mile 17.3, shall operate as follows:
(1) From April 1 to October 31:
(i) 8 a.m. to midnight, the draws shall open on signal;
(ii) Midnight to 8 a.m., the draws shall open on signal if notification is made prior to 11 p.m.,
(2) From November 1 through March 31, the draw shall open on signal if at least 24 hours notice is given.
(b) The draw of the Stillwater Lift Bridge, Mile 23.4, shall open on signal as follows:
(1) From May 15 through October 15, daily:
(i) 8 a.m. to midnight, every half hour;
(ii) Midnight to 8 a.m., upon two hours notice.
(2) From October 16 through May 14, if at least 24 hours notice is given.
(c) The draw of the Soo Line Railroad Bridge, Mile 40.7, at Otisville, need not be opened for the passage of vessels.
[CGD2-91-01, 56 FR 21303, May 8, 1991, as amended by 59 FR 63898, Dec. 12, 1994; USCG-1998-3799, 63 FR 35527, June 30, 1998; CGD08-02-035, 68 FR 74479, Dec. 24, 2003; USCG-2017-0687, 83 FR 22201, May 14, 2018]
§ 117.669 St. Louis River (Duluth-Superior Harbor).
(a) The draw of the Burlington Northern Grassy Point railroad Bridge, mile 5.44, shall open on signal except that, from December 15 through March 15 the draw shall open if at least 12-hour notice is given.
(b) The draw of the Canadian National Combined Railroad and Highway Bridge, mile 13.91, need not be opened for the passage of vessels. The owner shall return the draw to operable condition within a reasonable time when notified by the District Commander to do so.
[USCG-2017-0212, 82 FR 33803, July 21, 2017]
§ 117.671 Upper Mississippi River.
(a) The draws of all bridges between Lock and Dam No. 14, mile 493.3, and Lock and Dam No. 2, mile 815.2, shall open on signal; except that, from on or about December 15 through the last day of February, the draws shall open on signal if at least 24 hours notice is given.
(b) The draws of all bridges between Lock and Dam No. 2, mile 815.2 and Lock and Dam No. 1, mile 847.6, shall open on signal; except that, from on or about December 15 through the last day of February, the draws shall open on signal if at least 12 hours notice is given.
[USCG-2016-0561, 82 FR 55322, Nov. 21, 2017]
85 Mississippi
§ 117.675 Back Bay of Biloxi.
(a) The draw of the I-110 bridge, mile 3.0 at Biloxi, shall open on signal if at least six hours notice is given.
(b) The draw of the Popps Ferry Road bridge, mile 8.0, at Biloxi, shall open on signal; except that, from 7:30 a.m. to 9 a.m. and from 4:30 p.m. to 6 p.m. Monday through Friday, except Federal holidays, the draw need not be opened for passage of vessels. The draw shall open at any time for a vessel in distress.
[CGD8-85-05, 50 FR 27583, July 5, 1985, as amended by CGD08-96-049, 64 FR 6221, Feb. 9, 1999; CGD08-06-015, 71 FR 26416, May 5, 2006]
§ 117.681 Old Fort Bayou.
The draw of the bridge, mile 1.6 at Ocean Springs, shall open on signal; except that, from 9 p.m. to 5 a.m., the draw shall open on signal if at least eight hour notice is given; on Thanksgiving Day, Christmas Day and New Year's Day the draw shall open on signal if at least 12 hour notice is given; and the draw need not open to vessels from 6:30 a.m. to 8 a.m. and from 4 p.m. to 6 p.m. Monday through Friday, except federal holidays. The draw shall open anytime at the direction of the District Commander.
[USCG-2018-0968, 86 FR 7240, Jan. 27, 2021]
§ 117.683 Pearl River.
See § 117.486, Pearl River, listed under Louisiana.
[USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.684 Bayou Portage.
The draw of the Henderson Avenue Bridge, mile 2.0, at Pass Christian, MS shall open on signal if at least two hours notice is given to the Harrison County Board of Supervisors.
[CGD08-04-010, 69 FR 69531, Nov. 30, 2004]
§ 117.685 Tchoutacabouffa River.
The draw of the Cedar Lake Road Bridge over the Tchoutacabouffa River, mile 8.0, shall open on signal if at least twenty-four hours notice is given.
[CGD08-98-055, 63 FR 49822, Sept. 18, 1998]
§ 117.686 Yazoo River.
(a) The Satartia highway (S433) bridge, mile 53.3 at Satartia, shall open on signal if at least two hours notice is given. When a vessel has given notice and fails to arrive within the two hour period specified, the drawtender shall remain on duty for two additional hours and open the draw if the requesting vessel appears. After this time, an additional two hour notice is required.
(b) The draws of the bridges upstream from the Satartia highway (S433) bridge shall open on signal if at least four hours notice is given. When a vessel has given notice and fails to arrive within the four hour period specified, the drawtender shall remain on duty for two additional hours and open the draw if the requesting vessel appears. After this time, an additional four hour notice is required.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984. Redesignated at CGD8-92-03, 57 FR 27696, June 22, 1992, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000; USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
86 Missouri
§ 117.687 Missouri River.
The draws of the bridges, except for the Atchison Railroad Bridge, Mile 422.5, see § 117.411(b) for further details, across the Missouri River shall open on signal; except during the winter season between the date of closure and date of opening of the commercial navigation season as published by the Army Corps of Engineers, the draws need not open unless at least 24-hours advance notice is given.
[USCG-2014-0358, 80 FR 81181, Dec. 29, 2015]
87 Nebraska
§ 117.691 Missouri River.
The draw of the Illinois Central Gulf Railroad Bridge, mile 618.3, at Omaha, shall open on signal; except during the winter season between the date of closure and date of opening of the commercial navigation season as published by the Army Corps of Engineers, the draw need not open unless at least 24 hours advance notice is given.
[CGD08-98-020, 66 FR 62938, Dec. 4, 2001]
88 New Hampshire
§ 117.697 Hampton River.
The SR1A bridge, mile 0.0 at Hampton, operates as follows:
(a) The draw shall open on signal from April 1 through October 31 for the passage of vessels during daylight hours from three hours before to three hours after each high tide. “Daylight hours” means one-half hour before sunrise to one-half hour after sunset. High tide occurs one-half hour later than the time of high tide for Portland, Maine, as published in the tide tables published by private entities using data provided by the National Ocean Service. At all other times, the draw shall open on signal if at least three hours notice is given.
(b) The owners of the bridge shall provide and keep in good legible condition two board gages painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
(c) Vessels which can pass under the closed draw with a clearance of one foot or more shall not signal for the opening of the draw. In case a vessel gives the prescribed signal and the drawtender is uncertain as to whether the vessel can safely pass, the drawtender shall open the draw. If the drawtender finds that there would have been a clearance of one foot or more had the draw remained closed, the matter shall be reported immediately to the District Commander, giving the name of the vessel, the time of opening the draw, the clearance under the bridge as indicated by the gage at the time of opening the draw, and the approximate vertical clearance required by the vessel.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2001-9286, 66 FR 33641, June 25, 2001]
§ 117.699 Little Harbor.
The draw of the SR1B bridge, mile 1.0 between New Castle and Rye, shall open on signal from April 1 through October 31 from 6 a.m. to 10 p.m. if at least four hours notice is given. At all other times, the draw shall open as soon as possible only for emergencies.
§ 117.700 Piscataqua River.
See § 117.531, Piscataqua River, listed under Maine.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
89 New Jersey
§ 117.701 Alloway Creek.
The draws of the Salem County bridges, miles 5.1 at Hancocks Bridge, and 6.5 at New Bridge, shall open on signal if at least 24 hours notice is given.
[USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
§ 117.702 Arthur Kill.
(a) The draw of the Arthur Kill (AK) Railroad Bridge shall be maintained in the full open position for navigation at all times, except during periods when it is closed for the passage of rail traffic.
(b) The bridge owner/operator shall maintain a dedicated telephone hot line for vessel operators to call the bridge in advance to coordinate anticipated bridge closures. The telephone hot line number shall be posted on signs at the bridge clearly visible from both the up and downstream sides of the bridge.
(c) Tide constrained deep draft vessels shall notify the bridge operator, daily, of their expected times of vessel transits through the bridge, by calling the designated telephone hot line.
(d) The bridge shall not be closed for the passage of rail traffic during any predicted high tide period if a tide constrained deep draft vessel has provided the bridge operator with an advance notice of their intent to transit through the bridge. For the purposes of this regulation, the predicted high tide period shall be considered to be from two hours before each predicted high tide to a half-hour after each predicted high tide taken at the Battery, New York.
(e) The bridge operator shall issue a manual broadcast notice to mariners of the intent to close the bridge for a period of up to 30 minutes for the passage of rail traffic, on VHF-FM channels 13 and 16 (minimum range of 15 miles) 90 minutes before and again at 75 minutes before each bridge closure.
(f) Beginning at 60 minutes prior to each bridge closure, automated or manual broadcast notice to mariners must be repeated at 15 minute intervals and again at 10 and 5 minutes prior to each bridge closure and once again as the bridge begins to close, at which point the appropriate sound signal will be given.
(g) Two 15 minute bridge closures may be provided each day for the passage of multiple rail traffic movements across the bridge. Each 15 minute bridge closure shall be separated by at least a 30 minute period when the bridge is returned to and remains in the full open position. Notification of the two 15 minute closures shall follow the same procedures outlined in paragraphs (e) and (f) above.
(h) A vessel operator may request up to a 30 minute delay for any bridge closure in order to allow vessel traffic to meet tide or current requirements; however, the request to delay the bridge closure must be made within 30 minutes following the initial broadcast for the bridge closure. Requests received after the initial 30 minute broadcast will not be granted.
(i) In the event of a bridge operational failure, the bridge operator shall immediately notify the Coast Guard Captain of the Port New York. The bridge owner/operator must provide and dispatch a bridge repair crew to be on scene at the bridge no later than 45 minutes after the bridge fails to operate. A repair crew must remain on scene during the operational failure until the bridge has been fully restored to normal operations or until the bridge is raised and locked in the fully open position.
(j) When the bridge is not tended locally it must be operated from a remote location. A sufficient number of closed circuit TV cameras, approved by the Coast Guard, shall be operated and maintained at the bridge site to enable the remotely located bridge tender to have full view of both river traffic and the bridge.
(k) VHF-FM channels 13 and 16 shall be maintained and monitored to facilitate communication in both the remote and local control locations. The bridge shall also be equipped with directional microphones and horns to receive and deliver signals to vessels.
(l) Whenever the remote control system equipment is disabled or fails to operate for any reason, the bridge operator shall immediately notify the Captain of the Port New York. The bridge shall be physically tended and operated by local control as soon as possible, but no more than 45 minutes after malfunction or disability of the remote system.
(m) Mechanical bypass and override capability of the remote operation system shall be provided and maintained at all times.
[USCG-2010-1117, 76 FR 45692, Aug. 1, 2011]
§ 117.705 Beaver Dam Creek.
The draw of the Ocean County bridge, mile 0.5 at Point Pleasant, shall open on signal from June 1 through September 30 and from 8 a.m. to 4 p.m. during April, May, October, and November. At all other times, the draw shall open on signal if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984]
§ 117.709 Cheesequake Creek.
(a) The draw of the S35 Bridge, at mile 0.0, at Morgan, South Amboy, New Jersey, shall operate as follows:
(1) From April 1 through November 30 from 7 a.m. to 8 p.m., the draw need only open on the hour. From 8 p.m. to 11 p.m. the draw shall open on signal. From 11 p.m. to 7 a.m. the draw shall open after at least a two hour advance notice is given by calling the number posted at the bridge.
(2) From December 1 through March 31, the draw shall open on signal after at least a two hour advance notice is given by calling the number posted at the bridge.
(b) The draw of the New Jersey Transit Rail Operations railroad bridge, mile 0.2, operates as follows:
(1) The draw shall open on signal; except that, at least four hours notice is required—
(i) From January 1 through March 31 from 6 p.m. to 6 a.m.;
(ii) From April 1 through April 30 and November 1 through November 30 from 10 p.m. to 6 a.m. Monday through Thursday, and midnight Sunday through 6 a.m. Monday; and
(iii) From December 1 through December 31 from 10 p.m. to 6 a.m.
(2) The owners of the bridge shall provide and keep in good legible condition two board gages painted white with black figures not less than eight inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD01-04-126, 70 FR 20465, Apr. 20, 2005; CGD01-05-096, 71 FR 17351, Apr. 6, 2006]
§ 117.714 Corson Inlet.
The draw of the Corson Inlet Bridge, mile 0.9, at Strathmere, shall open on signal; except that from October 1 through May 15 from 10 p.m. to 6 a.m. and from 6 a.m. to 10 p.m. on December 25 the draw need open only if at least two hours notice is given.
[USCG-2007-0026, 73 FR 5749, Jan. 31, 2008]
§ 117.716 Delaware River.
(a) The following apply to all drawbridges across the Delaware River:
(1) The draws of railroad bridges need not be opened when there is a train in the bridge block approaching the bridge with the intention of crossing or within five minutes of the known time of the passage of a scheduled passenger train.
(2) The opening of a bridge may not be delayed more than five minutes for a highway bridge or 10 minutes for a railroad bridge after the signal to open is given.
(3) The owners of drawbridges shall provide and keep in good legible condition two board gages painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
(b) The draw of the Conrail Memorial Railroad Bridge, mile 104.6, at Pennsauken Township, NJ shall be operated as follows:
(1) The bridge will be remotely operated from the Conrail South Jersey dispatch center in Mount Laurel, NJ, unless the remote operation system is in a failed condition.
(2) An AIS transmitter has been installed on the New Jersey side of the bridge at the bridge and land intersection in approximate position 39°58′50.52″ N (39.9807), 75°03′58.75″ (−75.06632). The AIS transmitter is assigned maritime mobile service identity (MMSI) number 993663001. The status of the bridge (open/closed/inoperative) will be provided via the name transmitted by the AIS private aids to navigation as DELAIR BRG-OPEN (fully open and locked position, channel light green), DELAIR BRG-CLOSED (other than fully open, not inoperative), or DELAIR BRG-INOP (other than fully open, inoperative). The AIS transmitter will transmit the bridge status every two minutes and upon a change in the bridge status.
(3) The remote operation system will be considered in a failed condition and qualified personnel will return and operate the bridge within 60 minutes if any of the following conditions are found:
(i) The remote operation system becomes incapable of safely and effectively operating the bridge from the remote operation center; or
(ii) Visibility of the waterway or bridge is degraded to less than equal that of an on-site bridge tender; or
(iii) Signals (communications) via sound or visual signals or radio telephone (voice) via VHF-FM channels 13 or 16 become inoperative; or
(iv) AIS becomes inoperative.
(4) Vessels that require an opening shall continue to request an opening via the methods defined in § 117.15(b) through (d) (sound or visual signals or radio telephone (VHF-FM) voice communications), via telephone at (856) 231-2301, or via push-to-talk (PTT) on VHF-FM channel 13. Vessels may push the PTT button five times while on VHF-FM channel 13 to request an opening.
(5) The signals for the remote operation center or on-site bridge tender to respond to a sound signal for a bridge opening include:
(i) When the draw can be opened immediately—a sound signal of one prolonged blast followed by one short blast and illumination of a fixed white light not more than 30 seconds after the requesting signal; or
(ii) When the draw cannot be opened immediately—five short blasts sounded in rapid succession and illumination of a fixed red light not more 30 seconds after the vessel's opening signal.
(6) The signals for the remote operation center or on-site bridge tender to respond to a visual signal for a bridge opening include:
(i) When the draw can be opened immediately—illumination of a fixed white light not more than 30 seconds after the requesting signal; or
(ii) When the draw cannot be opened immediately—illumination of a fixed red light not more 30 seconds after the vessel's opening signal.
(7) The fixed white light will remain illuminated until the bridge reaches the fully open position. The fixed white and red lights will be positioned on the east (New Jersey) bridge abutment adjacent to the navigation span.
[USCG-2016-0257, 83 FR 59311, Nov. 23, 2018]
§ 117.718 Elizabeth River.
The draw of the South Front Street bridge, mile 0.0 at Elizabeth, shall open on signal; except that, from 12 midnight to 7 a.m., the draw shall open on signal if at least three hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984. Redesignated by USCG-2012-0306, 77 FR 37314, June 21, 2012, as amended by USCG-2014-0285, 79 FR 24569, May 1, 2014; USCG-2017-0070, 82 FR 15291, Mar. 28, 2017]
§ 117.719 Glimmer Glass (Debbie's Creek).
(a) The draw of the Monmouth County highway bridge, mile 0.4 at Manasquan, shall open on signal, except as follows:
(1) From 4:30 p.m. January 1 through 8 a.m. April 1, from 4:30 p.m. to 8 a.m., the draw need open only if at least four-hours advance notice is given.
(2) From Memorial Day through Labor Day from 7 a.m. to 8 p.m., the draw need open only on the hour and half hour if any vessels are waiting to pass.
(b) The owners of the bridge shall provide and keep in good legible condition two board gauges painted white with black figures not less than eight inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gauges shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
[CGD05-98-111, 64 FR 59624, Nov. 3, 1999. Redesignated and amended by USCG-2012-0306, 77 FR 37314, June 21, 2012]
§ 117.720 Great Channel.
The draw of the County of Cape May bridge, mile 0.7, between Stone Harbor and Nummy Island, shall open on signal except that:
(a) From May 15 through October 15 from 10 p.m. to 6 a.m., the draw need only open if at least four hours advance notice is given.
(b) From October 16 through May 14, the draw need only open if at least 24 hours advance notice is given.
(c) From 9:15 a.m. to 2:30 p.m. on the fourth Sunday in March of every year, the draw need not open for vessels. If the fourth Sunday falls on a religious holiday, the draw need not open from 9:15 a.m. to 2:30 p.m. on the third Sunday of March of every year.
[CGD05-97-003, 63 FR 2312, Jan. 15, 1998, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998; CGD05-06-045, 71 FR 59383, Oct. 10, 2006]
§ 117.721 Grassy Sound Channel.
The draw of the Grassy Sound Channel Bridge, mile 1.0 in Middle Township, shall open on signal from 6 a.m. to 8 p.m. from May 15 through September 30. From 9:15 a.m. to 2:30 p.m. on the fourth Sunday in March of every year, the draw need not open for vessels. If the fourth Sunday falls on a religious holiday, the draw need not open from 9:15 a.m. to 2:30 p.m. on the third Sunday of March of every year. Two hours advance notice is required for all other openings by calling (609) 368-4591.
[CGD05-06-045, 71 FR 59383, Oct. 10, 2006]
§ 117.723 Hackensack River.
(a) The following requirements apply to all bridges across the Hackensack River:
(1) The owners of each bridge shall provide and keep in good legible condition clearance gauges for each draw, with figures not less than 18 inches high for bridges below the turning basin at mile 4.0, and 12 inches high for bridges above mile 4.0. The gauges shall be designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(2) Train and locomotives shall be controlled so that any delay in opening the draw shall not exceed 10 minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting the opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks before stopping or reversing.
(3) New Jersey Transit Rail Operations' (NJTRO) roving crews shall consist of two qualified operators on each shift, each having a vehicle which is equipped with marine and railroad radios, a cellular telephone, and emergency bridge repair and maintenance tools. This crew shall be split with one drawtender stationed at Upper Hack and the other drawtender at the NJTRO HX drawbridge. Adequate security measures shall be provided to prevent vandalism to the bridge operating controls and mechanisms to ensure prompt openings of NJTRO bridges.
(4) Except as provided in paragraphs (b) through (j) of this section, the draws shall open on signal.
(b) The draw of the PATH Bridge, mile 3.0, at Jersey City, shall open on signal provided at least a two-hour advance notice is provided by calling the number posted at the bridge. The draw need not open for the passage of vessel traffic Monday through Friday, except Federal holidays, from 6 a.m. to 10 a.m. and from 4 p.m. to 8 p.m.
Additional bridge openings shall be provided for commercial vessels from 6 a.m. to 7:20 a.m.; 9:20 a.m. to 10 a.m.; 4 p.m. to 4:30 p.m. and from 6:50 p.m. to 8 p.m. provided at least a two-hour advance notice is given by calling the number posted at the bridge.
(c) The draw of the Hack-Freight Railroad Bridge at mile 3.1, shall open on signal at all times, except as provided in paragraph (a)(2) of this section. The bridge shall be operated from a remote location at all times, except when it is tended locally. Sufficient closed circuit television cameras, approved by the Coast Guard, shall be operated and maintained at the bridge site to enable the remotely located bridge tender to have full view of both river traffic and the bridge.
(1) Radiotelephone Channel 13/16 VHF-FM shall be maintained and utilized to facilitate communication in both remote and local control locations. The bridge shall also be equipped with directional microphones and horns to receive and deliver signals to vessels.
(2) Whenever the remote control system equipment is partially disabled or fails for any reason, the bridge shall be physically tended and operated by local control as soon as possible, but no more than 45 minutes after malfunction or disability of the remote system. Mechanical bypass and override capability of the remote system shall be provided and maintained.
(d) Except as provided in paragraph (a)(2) of this section, the draw of the NJTRO Lower Hack Bridge, mile 3.4, at Jersey City shall open on signal if at least a one-hour advance notice is given to the drawtender at the Upper Hack bridge, mile 6.9, at Secaucus, New Jersey by calling the number posted at the bridge. In the event the NJTRO HX draw tender is at the Newark/Harrison (Morristown Line) Bridge, mile 5.8, on the Passaic River, up to an additional half hour delay is permitted.
(e) The draw of the AMTRAK Portal Bridge, mile 5.0, at Little Snake Hill, New Jersey, shall only open to 55 feet horizontal clearance in the east channel and the west channel will be closed to all navigation. The draw need not open for the passage of vessel traffic from 5 a.m. to 10 a.m. and from 3 p.m. to 8 p.m. Additional bridge openings shall be provided for tide restricted commercial vessels between 7 a.m. and 8 a.m. and between 5 p.m. and 6 p.m., if at least a two-hour advance notice is given by calling the number posted at the bridge. At all other times the bridge shall open on signal if at least a 2-hour advance notice is given.
(f) Except as provided in paragraph (a)(2) of this section, the draw of the NJTRO Upper Hack Bridge, mile 6.9 at Secaucus, N.J. shall open on signal unless the drawtender is at the NJTRO HX Bridge, mile 7.7 at Secaucus, N.J. over the Hackensack River, then up to a half hour delay is permitted.
(g) Except as provided in paragraph (a)(2) of this section, the draw of the NJTRO HX Bridge at mile 7.7, shall open on signal if at least a half hour notice is given to the drawtender at the Upper Hack Bridge.
(h) The draw of the Harold J. Dillard Memorial (Court Street) Bridge, mile 16.2, Hackensack, shall open on signal if at least four hours notice is given.
(i) The draw of the New York Susquehanna and Western Railroad bridge, mile 16.3, and the Midtown bridge, mile 16.5, both at Hackensack, need not be opened for the passage of vessels, however, the draws shall be restored to operable condition within 12 months after notification by the District Commander to do so.
(j) The draw of the Route 1 & 9 Bridge, mile 1.8, at Jersey City, shall open on signal; except that, from 11 p.m. to 7 a.m., the draw shall open on signal if at least two hours advance notice is given by calling the number posted at the bridge.
(k) The draw of the Route 7 Bridge, mile 3.1, at Jersey City, shall open on signal if at least four hours advance notice is given by calling the number posted at the bridge.
[USCG-2013-1005, 79 FR 34418, June 17, 2013, as amended by USCG-2016-0173, 81 FR 62367, Sept. 9, 2016; USCG-2019-0108, 84 FR 23490, May 22, 2019; USCG-2019-0086, 85 FR 8749, Feb. 18, 2020; USCG-2019-0892, 85 FR 26359, May 4, 2020; USCG-2020-0603, 86 FR 23610, May 4, 2021; USCG-2024-0412, 90 FR 13702, Mar. 26, 2025]
§ 117.729 Mantua Creek.
(a) The draw of the Conrail automated railroad bridge, mile 1.4, at Paulsboro, NJ shall operate as follows:
(1) The bridge will be operated remotely by the South Jersey Train Dispatcher located in Mt. Laurel, NJ. Operational information will be provided 24 hours a day by telephone at (856) 231-2282.
(2) From March 1 through November 30, the draw shall be left in the open position and will only be lowered for the passage of trains and to perform periodic maintenance authorized in accordance with subpart A of this part.
(3) From December 1 through the last day of February, the draw will open on signal if at least 4 hours notice is given by telephone at (856) 231-2282.
(4) The timeframe to initiate the bridge closure will be not more than 15 minutes before a train will arrive at the bridge location. If a train moving toward the bridge has crossed the home signal for the bridge, the train may continue across the bridge and must clear the bridge prior to stopping for any reason. Trains shall be controlled so that any delay in opening of the draw shall not exceed ten minutes except as provided in § 117.31(b).
(5) The bridge will be equipped with cameras and channel sensors to visually and electronically ensure the waterway is clear before the bridge closes. The video and sensors are located and monitored at the remote operating location in Mt. Laurel, NJ. The channel sensors signal will be a direct input to the bridge control system. In the event of failure or obstruction of the infrared channel sensors, the bridge will automatically stop closing and the South Jersey Train Dispatcher will return the bridge to the open position. In the event of video failure the bridge will remain in the full open position.
(6) The Conrail Railroad center span light will change from fixed green to flashing red anytime the bridge is not in the full open position.
(7) Prior to downward movement of the span, the horn will sound two prolonged blasts, followed by a pause, and then two short blasts until the bridge is seated and locked down. At the time of movement, the center span light will change from fixed green to flashing red and remain flashing until the bridge has returned to its full open position.
(8) When the train controller at Mt. Laurel has verified that rail traffic has cleared, they will sound the horn five times to signal the draw is about to return to its full open position.
(9) During upward movement of the span, the horn will sound two prolonged blasts, followed by a pause, and then sound two short blasts until the bridge is in the full open position. The center span light will continue to flash red until the bridge is in the fully open position.
(10) When the draw cannot be operated from the remote site, a bridge tender must be called to operate the bridge in the traditional manner. Personnel shall be dispatched to arrive at the bridge as soon as possible, but not more than one hour after malfunction or disability of the remote system.
(b) The draw of the S.R. 44 bridge, mile 1.7, at Paulsboro, shall open on signal from May 1 through October 31 from 7 a.m. to 11 p.m., and shall open on signal at all other times upon four hours notice.
[CGD3 84-33, 50 FR 30270, July 25, 1985, as amended by CGD05-03-121, 69 FR 21063, Apr. 20, 2004; USCG-2013-0710, 79 FR 44695, Aug. 1, 2014; USCG-2014-0807, 80 FR 22100, Apr. 21, 2015]
§ 117.731 Mullica River.
The draws of the bridges listed in this section shall open on signal, except as follows:
(a) The draw of the Lower Bank bridge, mile 15.0, need not open during the following periods unless at least four hours notice is given:
(1) From May 1 through November 30, from 11 p.m. to 7 a.m.
(2) From December 1 through April 30, at all times.
(b) The draw of the Green Bank bridge, mile 18.0, need not open unless at least four hours notice is given during the following periods:
(1) April 1 through November 30, from 11 p.m. to 7 a.m.
(2) December 1 through March 31, at all times.
(c) The drawspan must open as soon as possible for public vessels of the United States during the periods when four hours notice is required.
[CGD5-87-065, 53 FR 406, Jan. 7, 1988, as amended by CGD05 94-093, 60 FR 51732, Oct. 3, 1995. Redesignated and amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.733 New Jersey Intracoastal Waterway.
(a) The draw of the Route 35 Bridge, mile 1.1 across Manasquan River at Brielle, shall open on signal except as follows:
(1) From May 15 through September 30:
(i) On Saturdays, Sundays and Federal holidays, from 8 a.m. to 10 p.m., the draw need only open 15 minutes before the hour and 15 minutes after the hour.
(ii) On Mondays to Thursdays from 4 p.m. to 7 p.m., and on Fridays, except Federal holidays from 12 p.m. to 7 p.m., the draw need only open 15 minutes before the hour and 15 minutes after the hour.
(2) Year-round from 11 p.m. to 8 a.m., the draw need only open if at least four hours notice is given.
(b) The draw of the Route 88 Bridge, mile 3.0, across Point Pleasant Canal at Point Pleasant, shall operate as follows:
(1) From 7 a.m. to 11 p.m. the draw shall open on signal.
(2) From 11:01 p.m. to 6:59 a.m. the draw shall open on signal, if at least four hours advance notice is given.
(c) The draw of the Route 13 Bridge, mile 3.9, across Point Pleasant Canal at Point Pleasant, shall operate as follows:
(1) From 7 a.m. to 11 p.m. the draw shall open on signal.
(2) From 11:01 p.m. to 6:59 a.m. the draw shall open on signal, if at least four hours advance notice is given.
(d) The draw of the County Route 528 Bridge, mile 6.3 across Barnegat Bay at Mantoloking, shall open on signal; except that from Memorial Day through Labor Day on Saturdays, Sundays and Federal holidays from 9 a.m. to 6 p.m., the draw need only open on the hour, twenty minutes after the hour, and forty minutes after the hour.
(e) The draw of the S37 Bridge across Barnegat Bay, mile 14.1 at Seaside Heights, shall open on signal except as follows:
(1) From December 1 through March 31, the draw need only open if at least four hours notice is given.
(2) From April 1 through November 30 from 11 p.m. to 8 a.m., the draw need only open if at least four hours notice is given.
(3) From Memorial Day through Labor Day from 8 a.m. to 8 p.m., the draw need only open on the hour and half hour.
(f) The draw of the AMTRAK New Jersey Transit Rail Operations (NJTRO) automated railroad swing bridge across Beach Thorofare, mile 68.9 at Atlantic City shall operate as follows:
(1) Open on signal from 11 p.m. to 6 a.m. From 6 a.m. to 11 p.m., the draw shall open on signal from 20 minutes to 30 minutes after each hour and remain open for all waiting vessels.
(2) Opening of the draw span may be delayed for ten minutes except as provided in § 117.31(b). However, if a train is moving toward the bridge and has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, that train may continue across the bridge and must clear the bridge interlocks before stopping.
(3) When the bridge is not tended locally and/or is operated from a remote location, sufficient closed circuit TV cameras shall be operated and maintained at the bridge site to enable the remotely located bridge/train controller to have full view of both river traffic and the bridge.
(4) Radiotelephone Channel 13 (156.65 MHz) VHF-FM, shall be maintained and utilized to facilitate communication in both remote and local control locations. The bridge shall also be equipped with directional microphones and horns to receive and deliver signals to vessels within a mile that are not equipped with radiotelephones.
(5) Whenever the remote control system equipment is partially disabled or fails for any reason, the bridge shall be physically tended and operated by local control. Personnel shall be dispatched to arrive at the bridge as soon as possible, but not more that one hour after malfunction or disability of the remote system. Mechanical bypass and override capability of the remote operation system shall be provided and maintained.
(6) When the draw is opening and closing, or is closed, yellow flashing lights located on the ends of the center piers shall be displayed continuously until the bridge is returned to the fully open position.
(g) The draw of the Route 30 Bridge across Beach Thorofare, mile 67.2 at Atlantic City, shall open on signal if at least four hours of notice is given; except that:
(1) From April 1 through October 31, from 7 a.m. to 11 p.m. the draw need only open on the hour.
(2) On July 4, the draw need not open from 9:40 p.m. until 11:15 p.m. to accommodate the annual July 4th fireworks show. Should inclement weather prevent the fireworks event from taking place as planned, the draw need not open from 9:40 p.m. until 11:15 p.m. on July 5th to accommodate the annual July 4th fireworks show.
(3) On the third or fourth Wednesday of August the draw will open every two hours on the hour from 10 a.m. until 4 p.m. and need not open from 4 p.m. until 8 p.m. to accommodate the annual Air Show.
(h) The draw of the US40-322 (Albany Avenue) Bridge, mile 70.0 across Inside Thorofare, at Atlantic City, shall open on signal except that:
(1) Year-round, from 11 p.m. to 7 a.m.; and from November 1 through March 31 from 3 p.m. to 11 p.m., the draw need only open if at least four hours notice is given;
(2) From June 1 through September 30:
(i) From 9 a.m. to 4 p.m. and from 6 p.m. to 9 p.m. the draw need only open on the hour and half hour; and
(ii) From 4 p.m. to 6 p.m. the draw need not open.
(3) On July 4, the draw need not open from 9:40 p.m. until 11:15 p.m. to accommodate the annual July 4th fireworks show. Should inclement weather prevent the fireworks event from taking place as planned, the draw need not open from 9:40 p.m. until 11:15 p.m. on July 5th to accommodate the annual July 4th fireworks show.
(4) On the third or fourth Wednesday of August, the draw will open every two hours on the hour from 10 a.m. until 4 p.m. and need not open from 4 p.m. until 8 p.m. to accommodate the annual Air Show.
(i) The draw of the Dorset Avenue Bridge across Inside Thorofare, mile 72.1, at Ventnor City, shall open on signal except that:
(1) Year-round, from 11 p.m. to 7 a.m., the draw need only open if at least four-hour notice is given.
(2) From June 1 through September 30, from 9:15 a.m. to 9:15 p.m., the draw need open only on the 15 and 45 minutes after the hour.
(j) The draw of the Stone Harbor Boulevard Bridge, mile 102.0 across Great Channel, at Stone Harbor, shall open on signal except that:
(1) From October 1 through March 31 from 10 p.m. to 6 a.m. the draw need only open if at least eight hours notice is given.
(2) From Memorial Day through Labor Day from 6 a.m. to 6 p.m. on Saturdays, Sundays and Federal holidays, the draw need open only on the hour, 20 minutes after the hour, and 20 minutes before the hour.
(3) From 10 p.m. on December 24 until 6 a.m. on December 26, the draw need open only if at least two hours notice is given.
(k) The draw of Two-Mile Bridge, mile 112.2, across Middle Thorofare in Wildwood Crest, shall open on signal except:
(1) From 9:15 a.m. to 10:30 a.m. on the fourth Sunday in March of every year, the draw need not open for vessels. If the fourth Sunday falls on a religious holiday, the draw need not open for vessels from 9:15 a.m. to 10:30 a.m. on the third Sunday of March of every year.
(2) From 10:30 p.m. on December 24 until 10:30 p.m. on December 26, the draw need open only if at least two hours notice is given.
(l) The draw of Cape May Canal Railroad Bridge across Cape May Canal, mile 115.1, at Cape May shall operate as follows:
(1) The draw shall be maintained in the open position; the draw may close only for the crossing of trains and maintenance of the bridge. When the draw is closed for a train crossing a bridge tender shall be present to reopen the draw after the train has cleared the bridge. When the draw is closed for maintenance a bridge tender shall be present to open the draw upon signal.
(2) Train service generally operates as follows (please contact Cape May Seashore Lines for current train schedules):
(i) Winter (generally December through March): In general, there is no train service, therefore the bridge is unmanned and placed in the full open position.
(ii) Spring (generally April through May and Fall (generally September through November): Generally weekend service only: Friday through Sunday train service starts at 10 a.m. and ends at 7:30 p.m. Monday through Thursday the bridge generally unmanned and in the open position.
(iii) Summer Service (generally June through August): Daily train service starting at 10 a.m. and ending 7:30 p.m.
(3) When a vessel approaches the drawbridge with the draw in the open position, the vessel shall give the opening signal. If no acknowledgement is received within 30 seconds, the vessel may proceed, with caution, through the open draw. When the draw is open and will be closing promptly, the drawbridge will generally signal using sound signals or radio telephone.
(4) Opening of the draw span may be delayed for ten minutes after a signal to open except as provide in (117.31(b). However, if a train is moving toward the bridge and has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks as soon as possible in order to prevent unnecessary delays in the opening of the draw.
[CGD05-97-003, 63 FR 2311, Jan. 15, 1998, as amended by CGD05-01-007, 66 FR 39445, July 31, 2001; CGD05-06-045, 71 FR 59383, Oct. 10, 2006; USCG-2001-10881, 71 FR 70311, Dec. 4, 2006; USCG-2007-0026, 73 FR 5749, Jan. 31, 2008; USCG-2008-0697, 73 FR 79639, Dec. 30, 2008; 74 FR 17084, Apr. 14, 2009; USCG-2011-0698, 76 FR 79535, Dec. 22, 2011; USCG-2014-0121, 79 FR 18183, Apr. 1, 2014; USCG-2020-0647, 86 FR 46967, Aug. 23, 2021; 86 FR 54852, Oct. 5, 2021; USCG-2025-0312, 91 FR 3031, Jan. 26, 2026]
§ 117.734 Navesink River (Swimming River).
The Oceanic Bridge, mile 4.5, shall open on signal; except that, from December 1 through March 31, the draw shall open on signal, if at least a twenty-four hour notice is given by calling the number posted at the bridge. The owner of this bridge shall provide and keep in good legible condition clearance gauges with figures not less than eight inches high, designed, installed and maintained according to the provisions of § 118.160 of this chapter.
[CGD01-99-075, 64 FR 71655, Dec. 22, 1999]
§ 117.735 Newark Bay.
(a) The following requirements apply to all bridges across this waterway:
(1) Public vessels of the United States, state or local vessels used for public service, and vessels in distress shall be passed through the draw without delay. The opening signal from these vessels is four or more short blasts of a whistle or horn or a radio request.
(2) The owners of these bridges shall provide and keep in good legible condition two board gages painted white with black figures not less than 12 inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gauges shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
(3) Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed five minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks before stopping.
(b) The draw of the Lehigh Valley Drawbridge, mile 4.6, between the City of Newark and City of Bayonne, NJ, shall be operated from a remote location at all times, except when it is tended locally.
(1) Closed circuit television cameras shall be operated and maintained at the bridge site to enable the remotely located bridge tender to have a full view of both vessel traffic and the bridge.
(2) Radiotelephone Channel 13/16 VHF-FM shall be maintained and utilized to facilitate communication in both remote and local control locations. A push-to-talk (PTT) will be maintained on VHF-FM channel 13. Vessels may push the PTT button five times while on VHF-FM channel 13 and the remotely located bridge tender will receive and respond to the request and commence opening of the bridge.
(3) The bridge shall also be equipped with directional microphones and horns to receive and deliver signals to vessels.
(4) A telephone number will be maintained and posted for mariners to directly contact the remotely located bridge tender.
(5) Whenever the remote-control system equipment is partially disabled or fails for any reason, the bridge shall be physically tended and operated by local control as soon as possible, but no more than 60 minutes after malfunction or disability of the remote system. Mechanical bypass and override capability of the remote system shall be provided and maintained.
[USCG-2025-0805, 91 FR 45204, July 20, 2026]
§ 117.736 Oceanport Creek.
The drawspan for the New Jersey Transit Rail Operations Drawbridge, mile 8.4 near Oceanport, must open on signal from May 15 through September 15 between 5 a.m. and 9 p.m.; except that, the drawspan need not open 6 a.m. to 7:45 a.m. and 5:30 p.m. to 7:30 p.m on weekdays, excluding all federal holidays except for Martin Luther King Day. The drawspan must open on signal upon four hours notice from May 15 through September 15 between 9 p.m. and 5 a.m., and from September 16 through May 14; except that, the drawspan need not be opened from 6 a.m. to 7:45 a.m. and 5:30 p.m. to 7:30 p.m. on weekdays, excluding all federal holidays except for Martin Luther King Day. Public vessels of the United States must be passed as soon as possible at anytime.
[USCG-2001-10881, 71 FR 70311, Dec. 4, 2006]
§ 117.737 Oldmans Creek.
The draws of the US30 bridge, mile 3.1 at Nortonville, the Conrail railroad bridge, mile 4.0 at Jumbo, and the Salem County bridge, mile 5.1 at Pedricktown, need not be opened for the passage of vessels. However, the draws of any of these bridges shall be restored to operable condition within six months after notification by the District Commander to do so.
§ 117.739 Passaic River.
(a) The following requirements apply to all bridges in this section across the Passaic River:
(1) The owners of these bridges shall provide, and keep in good legible condition, clearance gauges with figures not less than twelve (12) inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(2) New Jersey Transit Rail Operations' (NJTRO) roving crews shall consist of an adequate number of operators to ensure NJTRO bridges are operated according to the requirements of this section.
(b) The draw of the Routes 1 & 9 (Lincoln Highway) Bridge, mile 1.8, at Newark, shall open on signal if at least four hours notice is given.
(c) The draw of CONRAIL's Point-No-Point Railroad Bridge, mile 2.6, between the City of Newark and the Town of Kearny, NJ, shall be operated from a remote location at all times, except when it is tended locally. The bridge shall open on signal once notice is given. After the signal to open is given, the opening may be delayed no more than ten minutes.
(1) Closed circuit television cameras shall be operated and maintained at the bridge site to enable the remotely located bridge tender to have a full view of both vessel traffic and the bridge.
(2) Radiotelephone Channel 13/16 VHF-FM shall be maintained and utilized to facilitate communication in both remote and local control locations. A push-to-talk (PTT) will be maintained on VHF-FM channel 13. Vessels may push the PTT button five times while on VHF-FM channel 13 and the remotely located bridge tender will receive and respond to the request and commence opening of the bridge.
(3) The bridge shall also be equipped with directional microphones and horns to receive and deliver signals to vessels.
(4) A telephone number will be maintained and posted for mariners to directly contact the remotely located bridge tender.
(5) Whenever the remote-control system equipment is partially disabled or fails for any reason, the bridge shall be physically tended and operated by local control as soon as possible, but no more than 60 minutes after malfunction or disability of the remote system. Mechanical bypass and override capability of the remote system shall be provided and maintained.
(d) The draw of the Jackson Street Bridge, mile 4.6, shall open on signal if at least four hours notice is given by calling the number posted at the bridge.
(e) The draw of the Bridge Street Bridge, mile 5.6, shall open on signal if at least four hours notice is given by calling the number posted at the bridge.
(f) The draw of the NJTRO Newark-Harrison (Morristown Line) Bridge, mile 5.8, at Harrison, New Jersey shall open on signal if at least one hour advance notice is given to the drawtender at Upper Hack Bridge mile 6.9, across the Hackensack River at Secaucus, N.J. In the event the HX drawtender is at the Lower Hack Bridge, mile 3.4 on the Hackensack River, at Jersey City then up to an additional half hour delay in opening is permitted. After the signal to open is given, the opening may be delayed no more than ten minutes. From 7:15 a.m. to 9 a.m. and from 4:30 p.m. to 6:50 p.m., Monday through Friday except federal holidays, the draw need not open.
(g) The draw of the Clay Street Bridge, mile 6.0, shall open on signal if at least four hours notice is given by calling the number posted at the bridge.
(h) The draw of the NJTRO (West Arlington) Bridge, mile 8.0, at Kearney, shall open on signal from 7 a.m. to 11 p.m. if at least eight hours notice is given. After the signal to open is given, the opening may be delayed no more than ten minutes. From 11 p.m. to 7 a.m., the draw need not be opened.
(i) The draw of the Route 7 (Rutgers Street) Bridge, mile 8.9, at Belleville, shall open on signal if at least four hours notice is given.
(j) The draw of the Avondale Bridge, mile 10.7, at Lyndhurst, shall open on signal if at least four hours notice is given.
(k) The draw of the NJTRO Bridge, mile 11.7, shall open on signal after at least a 24 hour notice is given by calling the number posted at the bridge.
[CGD01-95-171, 62 FR 6485, Feb. 12, 1997, as amended by CGD01-97-020, 63 FR 34124, June 23, 1998; CGD01-97-134, 64 FR 4788, Feb. 1, 1999; CGD01-99-076, 64 FR 62114, Nov. 16, 1999; USCG-2001-10881, 71 FR 70311, Dec. 4, 2006; USCG-2010-0234, 75 FR 51942, Aug. 24, 2010; USCG-2011-0268, 76 FR 65376, Oct. 21, 2011; USCG-2013-0638, 78 FR 72022, Dec. 2, 2013; USCG-2014-1070, 80 FR 10591, Feb. 27, 2015; USCG-2018-0443, 83 FR 30039, June 27, 2018; USCG-2024-1091, 90 FR 16088, Apr. 17, 2025; USCG-2025-1113, 91 FR 3035, Jan. 26, 2026; USCG-2025-0999, 91 FR 6137, Feb. 11, 2026; USCG-2026-0632, 91 FR 33074, June 3, 2026]
§ 117.741 Raccoon Creek.
The draw of the CONRAIL Railroad Bridge, mile 2.0 at Bridgeport, shall operate as follows:
(a) From March 1 through November 30, the draw shall be left in the open position at all times and will only be closed for the passage of trains and to perform periodic maintenance authorized in accordance with subpart A of this part.
(1) Trains shall be controlled so that any delay in opening of the draw shall not exceed ten minutes except as provided in § 117.31(b).
(2) Before the bridge closes for any reason, a train crewmember will observe the waterway for approaching craft, which will be allowed to pass. A train crewmember will then operate the bridge by radiophone. The bridge shall only be closed if a train crewmember's visual inspection shows that the channel is clear and there are no vessels transiting in the area.
(3) While the CONRAIL Railroad Bridge is moving from the full open to the full closed position, a train crewmember will maintain constant surveillance of the navigational channel to ensure no conflict with maritime traffic exists. In the event of failure or obstruction, the train crewmember will stop the bridge and return the bridge to the open position.
(4) The CONRAIL Railroad channel traffic lights will change from flashing green to flashing red anytime the bridge is not in the full open position.
(5) During closing of the span, the channel traffic lights will change from flashing green to flashing red, the horn will sound four times, followed by a pause, then the four blasts will be repeated and the bridge will close. When the rail traffic has cleared the swing span, the horn will automatically sound five times to signal the draw of the CONRAIL Railroad Bridge is about to return to its full open position.
(6) During open span movement, the channel traffic lights will be flashing red, the horn will sound four times, followed by a pause, then four blasts will be repeated until the bridge is in the full open position. In the full open position, the channel traffic lights will then turn from flashing red to flashing green.
(b) At all other times, the draw may be left in the closed position and opened on signal if at least four hours notice is given by telephone at (856) 231-2393.
[USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]
§ 117.743 Rahway River.
The draw of the Conrail Bridge, mile 2.0, across the Rahway River, at Linden, New Jersey, shall operate as follows:
(a) The draw shall remain in the full open position at all times, and shall only be closed for the passage of rail traffic or the performance of maintenance authorized in accordance with subpart A of this part.
(b) The draw shall be remotely operated by a bridge/train dispatcher located at the Conrail Dispatch Office at Mount Laurel, New Jersey.
(c) A marine traffic light system shall be maintained at the bridge and display flashing green lights to indicate that vessels may pass through the bridge, and flashing red lights anytime the bridge is not in the full open position.
(d) An infrared sensor system shall be maintained at the bridge to determine that no conflict with vessel traffic exists while the bridge is closing.
(e) Before the bridge may be closed from the remote location, an on-site train crewmember shall observe the waterway for any vessel traffic. All approaching vessels shall be allowed to pass before the bridge may close. The on-scene train crewmember shall then communicate with the bridge/train dispatcher at the Conrail Dispatch Office, at Mount Laurel, either by radio or telephone, to request that the bridge be closed.
(f) While the bridge is moving from the full open to full closed position, the bridge/train dispatcher shall maintain constant surveillance of the navigational channel at the bridge using the infrared sensor system.
(g) If the infrared sensors detect a vessel or other obstruction approaching or under the bridge before the draw is fully lowered and locked, the closing sequence shall be stopped, automatically, and the draw shall be raised to its full open position until the channel is clear.
(h) During the downward bridge closing movement, the marine traffic light system located at the bridge will change from flashing green to flashing red, the public address system shall announce that the bridge shall be closing, and the horn shall sound two times, pause 10 seconds, then repeat two horn blasts until the bridge is seated and fully locked down.
(i) When all rail traffic has cleared the bridge, the bridge/train dispatcher shall sound the horn five-times to signal that the draw is about to open.
(j) In the event of a failure, or obstruction to the infrared sensor system, the bridge shall immediately be returned to the full open position until the problem is corrected.
(k) In the event of a loss of communication between the on-site personnel and the bridge/train dispatcher, the bridge shall immediately be returned to the full open position until the problem is corrected.
(l) Should the draw become inoperable from the remote site while the bridge is in the closed position, a bridge tender, maintenance personnel, or engineer shall be deployed to be on scene within one hour from the time the draw becomes inoperable until the bridge can be returned to the full open position.
(m) Trains shall be controlled so that any delay in opening of the draw shall not exceed ten minutes after a train has crossed the bridge; except, as provided in 33 CFR 117.31(b). However, if a train moving toward the bridge has crossed the home signal for the bridge, the train may continue across the bridge and must clear the bridge interlocks before stopping.
[CGD01-03-096, 69 FR 8814, Feb. 26, 2004]
§ 117.745 Rancocas Creek.
(a) The following requirements apply to all bridges across the Rancocas River (Creek):
(1) Public vessels of the United States must be passed through the drawspan of each drawbridge as soon as possible without delay at anytime. The opening signal from these vessels is four or more short blasts of a whistle or horn, or a radio request.
(2) The owners of these bridges shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(3) Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed ten minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, that train may continue across the bridge and must clear the bridge interlocks before stopping or reversing.
(b) The drawspan for the Riverside-Delanco/SR#543 Drawbridge, mile 1.3 at Riverside must operate as follows:
(1) From April 1 through October 31 open on signal from 7 a.m. to 11 p.m.
(2) From November 1 through March 31 from 7 a.m. to 11 p.m., open on signal if at least 24 hours notice is given, except as provided in paragraph (a)(1) of this section.
(3) Year round from 11 p.m. to 7 a.m. need not open for the passage of vessels, except as provided in paragraph (a)(1) of this section.
[CGD5 91-054, 58 FR 40591, July 29, 1993, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006; USCG-2012-0306, 77 FR 37314, June 21, 2012; USCG-2015-0423, 80 FR 57721, Sept. 25, 2015; USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
§ 117.747 Raritan River.
(a) The draw of New Jersey Transit Rail Operations Railroad Bridge at mile 0.5 shall open on signal; except that, from 6 a.m. to 9:30 a.m. and 4:30 p.m. to 7:30 p.m., Monday through Friday, except holidays, the bridge need not open.
(b) The bridge owner shall provide and keep in good legible condition two clearance gauges with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(c) Trains and locomotives shall be controlled so that any delay in opening the draw span shall not exceed ten minutes. However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks before the bridge may be opened.
[USCG-2009-0202, 74 FR 49325, Sept. 28, 2009]
§ 117.750 Schellenger Creek.
The draw of the Cape May County bridge, mile 0.3 at Cape May, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 43462, Oct. 29, 1984]
§ 117.751 Shark River (South Channel).
The draws of the S71 Bridge, mile 0.8, and the Railroad Bridge, mile 0.9, both at Avon, operate as follows:
(a) The bridges operate as one unit. The owners shall provide signal systems so connected that the operator of either bridge may simultaneously notify the operator of the other bridge. The operator of the first bridge to be passed shall be responsible for observing the approach vessels, for receiving and acknowledging signals, and for coordinating the opening of the other draw.
(b) The draws shall open on signal; except that, from May 15 through September 30 from 4 p.m. to 7 p.m. Monday through Friday except Federal holidays and from 9 a.m. to 9 p.m. Saturdays, Sundays, and holidays, the draw need be opened only on the hour and half hour if a vessel is waiting to pass.
(c) The owners of the bridges shall provide and keep in good legible condition two board gages painted white with black figures not less than eight inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridges that they are plainly visible to operators of vessels approaching the bridges either up or downstream.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2012-0930, 77 FR 70373, Nov. 26, 2012]
§ 117.755 Shrewsbury River.
The draw of the Sea Bright Bridge at mile 4.0, across the Shrewsbury River at Sea Bright, New Jersey, shall operate as follows:
(a) The draw shall open on signal at all times; except that, from the Friday before Memorial Day through Labor Day, on Friday, Saturday, Sunday and holidays, between 9 a.m. and 7.pm., the draw need only open on the hour.
(b) The draw need not be opened at any time for a sail boat unless it is operating under auxiliary power or is being towed by a powered vessel.
(c) The owners of the bridge shall keep in good legible condition two clearance gages with figures not less than eight inches high, designed, installed, and maintained according to the provisions of § 118.160 of this chapter.
[USCG-2010-0461, 75 FR 38714, July 6, 2010, as amended by USCG-2018-0874, 84 FR 30879, June 28, 2019; USCG-2017-0460, 84 FR 32622, July 9, 2019]
§ 117.756 South River.
The draw of the Conrail bridge, mile 2.8 at South River shall open on weekdays (exclusive of holidays) from December 1 through the last day of February if at least four hours notice is given. From March 1 through November 30, and December 1 through the last day of February on weekends and holidays the draw shall be maintained open to navigation except for closure to accommodate passage of a train. The draw shall be opened as soon as possible at all times for passage of a public vessel of the United States.
[CGD3 83-067, 49 FR 33014, Aug. 20, 1984]
§ 117.757 Townsend Inlet.
The draw of Townsend Inlet Bridge, mile 0.3 in Avalon, shall open on signal except:
(a) From 9:15 a.m. to 2:30 p.m. on the fourth Sunday in March of every year, the draw need not open for vessels. If the fourth Sunday falls on a religious holiday, the draw need not open from 9:15 a.m. to 2:30 p.m. on the third Sunday of March of every year.
(b) From 11 p.m. on December 24 until 11 p.m. on December 25, the draw need open only if at least two hours notice is given.
[USCG-2007-0026, 73 FR 5749, Jan. 31, 2008]
§ 117.759 Wading River.
The draw of the Burlington County highway bridge, mile 5.0 at Wading River, shall open on signal if at least 24 hours notice is given.
90 New York
§ 117.769 Black Rock Canal.
The draws of the Ferry Street bridge, mile 2.6, and Canadian National Railway bridge, mile 3.8, both at Buffalo, shall operate as follows:
(a) From April 15 through November 30, the draws shall open on signal. However, between the hours of 12 midnight and 8 a.m., seven days a week, no bridgetender is required to be in attendance at the bridges and the draws shall open on signal if notice is given to the owners at least two hours in advance of a vessel's intended time of passage through the draws.
(b) From December 1 through April 14, no bridgetender is required to be in attendance at the bridges and the draws shall open on signal if notice is given to the owners at least four hours in advance of a vessel's time of intended passage through the draws.
[CGD09-94-008, 59 FR 50167, Oct. 3, 1994]
§ 117.771 Bronx River.
(a) The draw of the Conrail Bridge, mile 1.6 at the Bronx, New York, need not be opened for the passage of vessels.
(b) The owners of the Conrail Bridge, mile 1.6, at the Bronx, New York, shall provide and keep in good legible condition two clearance gauges designed, installed and maintained in accordance with the provisions of § 118.160 of this chapter.
[CGD01-97-018, 62 FR 54385, Oct. 20, 1997, as amended by CGD01-99-070, 65 FR 45718, July 25, 2000; USCG-2019-0442, 84 FR 43045, Aug. 20, 2019]
§ 117.773 Buffalo River.
(a) The draw of the Michigan Avenue bridge, mile 1.3, at Buffalo, shall operate as follows:
(1) From March 22 through December 15, the draw shall open within 20 minutes of signal. However, the draw need not open from 7:30 a.m. to 9 a.m., and from 4 p.m. to 5:45 p.m., Monday through Saturday.
(2) From December 16 through March 21, the draw shall open on signal if notice is given at least 4 hours in advance of a vessel's time of intended passage through the draw.
(b) The draw of the Ohio Street bridge, mile 2.1, at Buffalo, shall operate as follows:
(1) From March 22 through December 15, the draw shall open on signal within 20 minutes after a request is made to the Michigan Avenue drawtender. However, the draw need not open from 7:30 a.m. to 9 a.m., and from 4 p.m. to 5:45 p.m., Monday through Saturday.
(2) From December 16 through March 21, the draw shall open on signal if notice is given at least 4 hours in advance of a vessel's time of intended passage through the draw.
(3) In addition to the standard signals required for requesting the bridge to open, the owners of this bridge shall maintain and monitor a marine radiotelephone for use by the Michigan Avenue drawtender for receiving requests for opening the Ohio Street bridge. The drawtender shall maintain communications with any transiting vessel until the vessel has cleared both the Ohio Street and Michigan Avenue draws.
(c) The draws of the CSX Transportation railroad bridges, miles 4.02 and 4.39, both at Buffalo, shall open on signal if notice is given at least 4 hours in advance of a vessel's time of intended passage through the draws.
(d) The South Park Avenue bridge, mile 5.3, at Buffalo, shall open on signal if notice is given at least 4 hours in advance of a vessel's time of intended passage through the draw. However, the draw need not open from 7 a.m. to 8:30 a.m., and from 4:30 p.m. to 6 p.m., Monday through Saturday.
(e) The periods when the bridges need not open on signal prescribed in paragraphs (a)(1), (b)(1), and (d) in this section shall not be effective on Sundays, and on New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Christmas Day, or days observed in lieu of any of these under State law.
[CGD09-95-022, 61 FR 10467, Mar. 14, 1996, as amended by USCG-1999-5832, 64 FR 34712, June 29, 1999]
§ 117.781 East River.
The following requirements apply to the Roosevelt Island bridge, mile 6.4 at New York City, as follows:
(a) Public vessels of the United States Government, state or local vessels used for public safety, and vessels in distress shall be passed through the draws of each bridge as soon as possible without delay at anytime. The opening signal from these vessels shall be four or more short blasts of a whistle, horn or radio request.
(b) The owners of each bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(c) The draw of the Roosevelt Island bridge shall open on signal if at least two hour advance notice is given to the drawtender at the Grand Street/Avenue bridge, mile 3.1 across Newtown Creek (East Branch), the New York Department of Transportation (NYCDOT) Radio Hotline or NYCDOT Bridge Operations Office. In the event the drawtender is at Borden Avenue or Hunters Point Avenue bridges mile 1.2 and 1.4, respectively, across Dutch Kills, up to an additional half hour delay may be required.
[CGD1-90-040, 55 FR 37710, Sept. 13, 1990, as amended by USCG-2009-0348, 74 FR 52888, Oct. 15, 2009]
§ 117.785 Genesee River.
The draw of the Colonel Patrick Henry O'Rorke Memorial Bridge, mile 1.2 at Rochester, shall open on signal from April 1 through December 15; however, from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw need be opened only for the passage of commercial vessels. From 9 a.m. to 4 p.m. and 6 p.m. to 11 p.m., Monday through Friday, except Federal holidays, and from 7 a.m. to 11 p.m. on Saturdays, Sundays, and Federal holidays, the draw need be opened only on the hour and half-hour, except that commercial vessels shall be passed at any time. From December 16 through March 31, the draw shall open on signal if at least 12 hours notice is given. The owners of the bridge shall maintain clearance gauges in accordance with 33 CFR 118.160.
[USCG-2013-0921, 78 FR 72025, Dec. 2, 2013]
§ 117.787 Gowanus Canal.
The draws of the Ninth Street Bridge, mile 1.4, the Third Street Bridge, mile 1.8, the Carroll Street Bridge, mile 2.0, and the Union Street Bridge, mile 2.1, at Brooklyn, shall open on signal, if at least a two-hour advance notice is given to the New York City Department of Transportation (NYCDOT), Radio Hotline, or the NYCDOT Bridge Operations Office.
[CGD01-99-067, 65 FR 46870, Aug. 1, 2000]
§ 117.789 Harlem River.
(a) The draws of all railroad bridges across the Harlem River may remain in the closed position from the time a train scheduled to cross the bridge is within five minutes from the bridge, and until that train has fully crossed the bridge. The maximum time permitted for delay shall not exceed ten (10) minutes. Land and water traffic should pass over or through the draw as soon as possible to prevent unnecessary delays in the opening and closure of the draw.
(b)(1) The draws of the bridges at 103 Street, mile 0.0, 125 Street (Triborough), mile 1.3, Willis Avenue, mile 1.5, Third Avenue, mile 1.9, Madison Avenue, mile 2.3, 145 Street, mile 2.8, Macombs Dam, mile 3.2, 207 Street, mile 6.0, and the Broadway Bridge, mile 6.8, shall open on signal if at least a four-hour advance notice is given to the New York City Highway Radio (Hotline) Room and the Triborough Bridge and Tunnel Authority (TBTA) for the 125 Street (Triborough), mile 1.3. The draws of the above bridges, except the Broadway Bridge, need not open for the passage of vessel traffic from 6 a.m. to 9 a.m. and 5 p.m. to 7 p.m., Monday through Friday, except federal holidays. The draw of the Broadway Bridge need not open for the passage of vessel traffic from 7 a.m. to 10 a.m. and 4 p.m. to 7 p.m., Monday through Friday, except federal holidays.
(2) The draws of the Willis Avenue Bridge, mile 1.5, Third Avenue Bridge, mile 1.9, and the Madison Avenue Bridge, mile 2.3, need not open for the passage of vessel traffic at various times between 8 a.m. and 5 p.m. on the first Sunday in May and November. The exact time and date of each bridge closure will be published in the Local Notice to Mariners several weeks prior to each closure.
(c) The draw of the Metro North (Park Avenue) Bridge, mile 2.1, shall open on signal, except, as provided in paragraph (a) of this section, if at least a four-hour advance notice is given. The draw need not open for the passage of vessel traffic from 5 a.m. to 10 a.m. and 4 p.m. to 8 p.m., Monday through Friday, except Federal holidays.
(d) The draw of the Spuyten Duyvil railroad bridge, mile 7.9, shall open on signal at all times, except as provided in paragraph (a) of this section.
[USCG-2008-0456, 75 FR 230, Jan. 5, 2010]
§ 117.791 Hudson River.
(a) The draws of the bridges listed in this section shall open as soon as possible at any time for the passage of the following vessels:
(1) Downbound vessels during a freshet of a height exceeding an elevation determined by the District Commander.
(2) Public vessels of the United States.
(3) Vessels of 500 tons or more.
(4) Tugs with a tow on a hawser.
(b) The draws of the bridges listed in this section shall not remain open for more than 15 minutes and may remain closed for up to 10 minutes to allow accumulated land traffic to pass.
(c) The draw of the Livingston Ave. (Amtrak) Bridge, mile 146.2 between Albany and Rensselaer, shall open on signal; except that, from April 1 through December 15, from 11:00 p.m. to 7:00 a.m., the draw shall open on signal if at least 4 hours notice is given and from December 16 through March 31, the draw shall open on signal if at least 24 hours notice is given.
(d) The draw of the Troy-Green Bridge, mile 152.7, between Troy and Green Island, operates as follows:
(1) From April 1 through December 15 the draw shall open on signal if at least a twenty four hour advance notice is given by calling the number posted at the bridge.
(2) From December 16 through March 31, the draw need not open for the passage of vessel traffic.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 85-42, 49 FR 43462, Oct. 29, 1984, 50 FR 26713, June 28, 1985; USCG-1999-5832, 64 FR 34712, June 29, 1999; USCG-2001-10881, 71 FR 70312, Dec. 4, 2006; USCG-2013-0257, 78 FR 56609, Sept. 13, 2013; USCG-2017-0926, 83 FR 66623, Dec. 27, 2018; USCG-2018-0874, 84 FR 30879, June 28, 2019; USCG-2020-0304, 85 FR 58278, Sept. 18, 2020; USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
§ 117.793 Hutchinson River (Eastchester Creek).
(a) The following requirements apply to all bridges across Hutchinson River (Eastchester Creek):
(1) The owners of each bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed and maintained according to the provision of § 118.160 of this chapter.
(2) Trains and locomotives shall be controlled so that any delay in opening the draw shall not exceed ten minutes except as provided in § 117.31(b). However, if a train moving toward the bridge has crossed the home signal for the bridge before the signal requesting opening of the bridge is given, the train may continue across the bridge and must clear the bridge interlocks before stopping.
(3) Except as provided in paragraphs (b) and (c) of this section each draw shall open on signal.
(b) The draw of the Hutchinson River Parkway Bridge, mile 0.9, at the Bronx, New York shall open on signal if at least a two-hour notice is given to the New York City Department of Transportation (NYCDOT) Radio Hotline, or the NYCDOT Bridge Operations Office.
(c) The draw of the South Fulton Avenue Bridge, mile 2.9, shall open on signal from three hours before to three hours after the predicted high tide. For the purposes of this section, predicted high tide occurs four hours after predicted high water for New York (Battery), as given in the tide tables published by private entities using data provided by the National Ocean Service.
(1) At all other times, the bridge shall open on signal if at least four hours advance notice is given to the Westchester County Road Maintenance Division during normal work hours or to the County's Parkway Police at all other times.
(2) The bridge tender shall honor requests for opening within six hours after predicated high water if such request is given to the bridge tender while he or she is on station (three hours before to three hours after predicted high tide).
[CGD01-93-009, 58 FR 42859, Aug. 12, 1993, as amended by CGD01-97-125, 63 FR 18321, Apr. 15, 1998; CGD01-99-070, 65 FR 45718, July 25, 2000; USCG-2001-9286, 66 FR 33641, June 25, 2001; CGD01-04-033, 69 FR 35246, June 24, 2001]
§ 117.795 Jamaica Bay and Connecting Waterways.
(a) The draw of the Marine Parkway bridge, mile 3.0 over Rockaway Inlet, shall open on signal Monday through Friday from 8 a.m. to 4 p.m. At all other times, the draw shall open on signal if at least eight hours notice is given; however, the draw shall open on signal if at least a one hour notice is given for the passage of U.S. Navy or National Oceanic and Atmospheric Administration vessels.
(b) The draw of the Beach Channel railroad bridge shall open on signal; except that, the draw need not open for the passage of vessel traffic, 6:45 a.m. to 8:20 a.m. and 5 p.m. to 6:45 p.m., Monday through Friday, except Federal holidays.
[CGD3 85-42, 50 FR 26713, June 28, 1985, as amended by USCG-2001-9286, 66 FR 33641, June 25, 2001; CGD01-06-033, 71 FR 61897, Oct. 20, 2006; USCG-2001-10881, 71 FR 70312, Dec. 4, 2006; 72 FR 50876, Sept. 5, 2007; USCG-2018-1032, 84 FR 8420, Mar. 8, 2019]
§ 117.797 Lake Champlain.
(a) The drawspan for each drawbridge listed in this section must open as soon as possible for public vessels of the United States.
(b) The draw of the US2 Bridge, mile 91.8, over Lake Champlain, between South Hero Island and North Hero Island, shall operate as follows:
(1) The draw shall open on signal on the hour and the half hour from May 15th through October 15th from 8 a.m. to 8 p.m. daily.
(2) The draw shall open on signal from May 15th through October 15th from 8 p.m. to 8 a.m. if at least four hours notice is given by calling the number posted at the bridge.
(3) The draw shall open on signal from October 16th through May 14th if at least four hours notice is given by calling the number posted at the bridge.
(c) The draw of the Central Vermont Railway bridge across Missisquoi Bay, mile 105.6 shall open on signal:
(1) From June 15 through September 15:
(i) Monday through Friday from 9 a.m. to 5 p.m.;
(ii) Saturdays, Sundays, Independence Day and Labor Day from 7 a.m. to 11 p.m.;
(iii) At all other times, if at least two hours notice is given.
(2) From September 16 through June 14 if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 83-059, 49 FR 49452, Dec. 20, 1984; CGD01-98-032, 64 FR 28103, May 25, 1999; USCG-2001-10881, 71 FR 70312, Dec. 4, 2006; USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
§ 117.799 Long Island, New York Inland Waterway from East Rockaway Inlet to Shinnecock Canal.
(a) At all times, public vessels of the United States must be passed through the drawspan of each drawbridge listed in this section as soon as possible.
(b) The draw of each bridge listed in this section need not be opened for sailing vessels, unless the vessels are under machinery power or under tow, if an opening would unduly delay other vessel or vehicular traffic.
(c) The owners of the bridges listed in this section shall provide and keep in good legible condition two board gages painted white with black figures not less than eight inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridges that they are plainly visible to operators of vessels approaching the bridges either up or downstream.
(d) The draws of the West Bay bridge, mile 0.1 across Quantuck Canal, Beach Lane bridge, mile 1.1 across Quantuck Canal, Quoque bridge, mile 1.1 across Quoque Canal and the Smith Point bridge, mile 6.1 across Narrow Bay shall open on signal from October 1 through April 30 from 8 a.m. to 4 p.m. and from May 1 through September 30 from 6 a.m. to 10 p.m. At all other times during these periods, the draws shall open as soon as possible but no more than one hour after a request to open is received.
(e) The draw of the Atlantic Beach Bridge across Reynolds Channel, mile 0.4, shall operate as follows:
(1) From October 1 through May 14 the draw shall open on signal from 8 a.m. to midnight.
(2) From midnight to 8 a.m. year-round, the draw shall open on signal if at least eight (8) hours of notice is given by calling the Bridge Tower at 516-239-1821.
(3) From May 15 through September 30, the bridge will open on signal except from 4 p.m. to 7 p.m. on weekdays, and from 11 a.m. to 9 p.m. on Saturdays, Sundays, Memorial Day, Independence Day, and Labor Day, when the bridge will open on the hour and half-hour.
(f) The draw of the Loop Parkway Bridge across Long Creek, mile 0.7, shall open for commercial vessels engaged in commerce, the draw shall open Monday thru Friday from 6:20 a.m. to 9:50 a.m. and 3:20 p.m. to 7:20 p.m. on signal at 20 and 50 minutes after the hour, and on signal at all other times. For all other vessels, the draw shall open on Monday thru Friday from 6:20 a.m. to 7:20 p.m. on signal at 20 and 50 minutes after the hour, and the draw shall open on Saturday, Sunday and Federal Holidays from 7:20 a.m. to 8:20 p.m. on signal at 20 and 50 minutes after the hour, and on signal at all other times.
(g) The draw of the Long Beach Bridge across Reynolds Channel, mile 4.7, shall open on signal; except that:
(1) From midnight to 8 a.m. year-round, the draw shall open on signal if at least four hours notice is given; and
(2) From 3 p.m. to 8 p.m. on Saturdays, Sundays, and holidays from May 15 through September 30, the draw need be opened only on the hour and half hour.
(3) From 10 p.m. to midnight on July 3 each year the draw need not open for the passage of vessel traffic.
(h) The draw of the Meadowbrook State Parkway Bridge, mile 12.8, across Sloop Channel, shall open on signal if at least a one-half hour notice is given to the New York State Department of Transportation, as follows:
(1) Every other hour on the even hour.
(2) From April 1 through October 31, on Saturdays, Sundays, and Federal holidays, every three hours beginning at 1:30 a.m. Notice may be given from the telephone located at the moorings on each side of the bridge or by marine radio.
(3) From 9 p.m. to midnight, on the Fourth of July, the Meadowbrook State Parkway Bridge need not open for the passage of vessel traffic.
(i) The draw of the Captree State Parkway Bridge at mile 30.7, across the State Boat Channel, at Captree Island, shall open on signal if at least a one half hour advance notice is given by calling the number posted at the bridge as follows:
(1) Every other hour on the even hour.
(2) From April 1 through October 31, on Saturday, Sunday, and Federal holidays every three hours beginning at 3 a.m.
[CGD3 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 84-51, 50 FR 2546, Jan. 17, 1985; CGD01-99-080, 64 FR 46275, Aug. 25, 1999; CGD01-04-025, 69 FR 34570, June 22, 2004; CGD01-04-047, 70 FR 15765, Mar. 29, 2005; USCG-2001-10881, 71 FR 70312, Dec. 4, 2006; USCG-2012-0144, 77 FR 22495, Apr. 16, 2012; USCG-2012-1040, 78 FR 6730, Jan. 31, 2013; USCG-2020-0052, 85 FR 41187, July 9, 2020; USCG-2023-0530, 89 FR 13911, Feb. 23, 2024; USCG-2023-0532, 89 FR 13913, Feb. 23, 2024; USCG-2023-0532, 89 FR 47083, May 31, 2024; USCG-2022-0854, 89 FR 37975, May 7, 2024]
§ 117.800 Mill Neck Creek.
The draw of the Bayville Bridge, mile 0.1, at Oyster Bay, New York, shall open on signal between 7 a.m. and 11 p.m., from May 1 through October 31, and between 7 a.m. and 5 p.m., Monday through Friday, from November 1 through April 30. At all other times the draw shall open on signal provided at least a two-hour advance notice is given by calling the number posted at the bridge.
[USCG-2008-0010, 73 FR 29690, May 22, 2008]
§ 117.801 Newtown Creek, Dutch Kills, English Kills and their tributaries.
(a) The following requirements apply to all bridges across Newtown Creek, Dutch Kills, English Kills, and their tributaries:
(1) The owners of all bridges across Newtown Creek, Dutch Kills, English Kills and their tributaries listed under this section, shall provide and keep in good legible condition two clearance gauges with figures not less than 12 inches high designed, installed and maintained according to the provisions of § 118.160 of this chapter.
(2) Trains and locomotives shall be controlled so that any delay in opening the draw shall not exceed five minutes. If a train moving toward the bridge has crossed the home signal for the bridge before the request to open the bridge is given, that train may continue across the bridge, but must clear the interlock before stopping.
(b) The draws of the Long Island Railroad bridges, at mile 1.1, across Dutch Kills at Queens, shall open on signal if at least six-hours advance notice is given to the Long Island Railroad Movement Bureau, except as provided in paragraph (a)(2) of this section.
(c) The draw of the Borden Avenue Bridge, mile 1.2, across Dutch Kills at Queens, shall open on signal if at least a two-hour advance notice is given to the New York City Department of Transportation (NYCDOT) Radio Hotline or NYCDOT Bridge Operations Office.
(d) The draw of the Hunters Point Avenue Bridge, mile 1.4, across Dutch Kills at Queens, shall open on signal if at least a two-hour advance notice is given to the New York City Department of Transportation (NYCDOT) Radio Hotline or the NYCDOT Bridge Operations Office.
(e) The draw of the Metropolitan Avenue Bridge, mile 3.4, across English Kills at New York City, shall open on signal if at least a two-hour advance notice is given to the New York City Department of Transportation (NYCDOT) Radio Hotline or the NYCDOT Bridge Operations Office.
(f) The draw of the Grand Street/Avenue Bridge, mile 3.1, across Newtown Creek (East Branch) between Brooklyn and Queens, shall open on signal if at least a two-hour advance notice is given to the New York City Department of Transportation (NYCDOT) Radio Hotline or the NYCDOT Bridge Operations Office.
(g)(1) The draw of the of the Pulaski Bridge, mile 0.6, and the Greenpoint Avenue Bridge, mile 1.3, shall open on signal if at least a two hour advance notice is given to the New York City Department of Transportation Radio (Hotline) Room.
(2) The Pulaski Bridge, mile 0.6, need not open for vessel traffic at various times between 8 a.m. and 5 p.m. on the first Sunday in both May and November. The exact time and date of the bridge closure will be published in the Local Notice to Mariners several weeks prior to the first Sunday of both May and November.
[CGD01-99-069, 65 FR 46872, Aug. 1, 2000, as amended by CGD01-04-019, 69 FR 34573, June 22, 2004; USCG-2024-0392, 89 FR 86242, Oct. 30, 2024]
§ 117.802 New Rochelle Harbor.
(a) The draw of the Glen Island Bridge, mile 0.8, at New Rochelle, New York, shall open on signal, except as follows:
(1) Two hours advance notice shall be given for openings from 12 midnight to 6 a.m. from May 1st through October 31st by calling the number posted at the bridge.
(2) Twenty-four hours advance notice shall be given for openings from 8 p.m. to 8 a.m. from November 1st through April 30th by calling the number posted at the bridge.
(b) The owner of the bridge shall provide, and keep in good legible condition, clearance gauges with figures not less than twelve (12) inches high designed, installed, and maintained according to the provisions of § 118.160 of this chapter.
[CGD1-95-002, 63 FR 27680, May 20, 1998, as amended by USCG-2026-0017, 91 FR 4848, Feb. 3, 2026]
§ 117.803 Niagara River.
The draw of the Canadian National Railway bridge, mile 33.0 at Buffalo, need not be opened for the passage of vessels.
§ 117.813 [Reserved]
§ 117.815 Westchester Creek.
The draw of the Bruckner Boulevard/Unionport Bridge, mile 1.7, at the Bronx, New York, shall open on signal if at least a two-hour advance notice is given to the New York City Department of Transportation (NYCDOT) radio hotline, or the NYCDOT Bridge Operations Office. The draw need not be opened for vessel traffic from 7 a.m. to 9 a.m. and 4 p.m. to 6 p.m., Monday through Friday. The owner of the bridge shall provide clearance gauges according to the provisions of § 118.160 of this chapter.
[CGD01-99-070, 65 FR 45718, July 25, 2000]
91 North Carolina
§ 117.820 Atlantic Intracoastal Waterway (Alternate Route), Great Dismal Swamp Canal.
The draw of the Great Dismal Swamp Canal Bridge, mile 28.0 at South Mills, NC, shall operate as follows:
(a) The draw shall remain in the open position for navigation. The draw shall only be closed for pedestrian crossings or periodic maintenance authorized in accordance with subpart A of this part.
(b) The bridge shall be operated by the Park Service Rangers at the Great Dismal Swamp Visitors Center. Operational information will be provided 24 hours a day on marine channel 13.
(c) The bridge shall not be operated when the operator's visibility is impaired.
(d) Before the bridge closes for any reason, the operator will monitor waterway traffic in the area. The bridge shall only be closed if the operator's visual inspection shows that the channel is clear and there are no vessels transiting in the area. While the bridge is moving, the operator shall maintain constant surveillance of the navigation channel.
(e) Before closing the draw, the horn will sound five short blasts. Five short blasts of the horn will continue until the bridge is seated and locked down to vessels.
(f) When pedestrian traffic has cleared, the horn will sound one prolonged blast followed by one short blast to indicate the draw is opening to vessel traffic.
[CGD05-06-017, 71 FR 40420, July 17, 2006]
§ 117.821 Atlantic Intracoastal Waterway, Albermarle Sound to Sunset Beach.
(a) The drawbridges across the Atlantic Intracoastal Waterway in North Carolina shall open on signal for commercial vessels at all times and on signal for pleasure vessels, except at the times and during the periods specified in this paragraph:
(1) Onslow Beach Swing Bridge, mile 240.7, at Cap Lejeune, NC, between 7 a.m. and 7 p.m., the draw need only open on the hour and half hour.
(2) Figure Eight Swing Bridge, mile 278.1, at Scotts Hill, NC, the draw need only open on the hour and half hour.
(3) S.R. 74 Bridge, mile 283.1, at Wrightsville Beach, NC, between 7 a.m. and 7 p.m., the draw need only open on the hour; except that from 7 a.m. to 9 a.m. on the second Saturday of July of every year, from 7 a.m. to 11 a.m. on the third and fourth Saturday of September of every year, and from 7 a.m. to 10:30 a.m. on the last Saturday of October of every year or the first or second Saturday of November of every year, the draw need not open for vessels due to annual races.
(b) If a pleasure vessel is approaching a drawbridge which is only required to open on the hour or on the hour and half hour, and cannot reach the drawbridge on the hour or on the half hour, the drawtender may delay the required opening up to 10 minutes past the hour or half hour.
[CGD05-97-072, 63 FR 9419, Feb. 25, 1998]
Editorial Note:For Federal Register citations affecting § 117.821, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.822 Cape Fear River.
The draw of the Cape Fear Memorial Bridge, mile 26.8, at Wilmington need not open for the passage of vessels from 7 a.m. to 9 a.m. on the second Saturday of July of every year, and from 7 a.m. to 11 a.m. on the first or second Sunday of November of every year to accommodate annual races.
[USCG-2012-0193, 77 FR 50378, Aug. 21, 2012]
§ 117.825 Newport River.
The draw of the Atlantic and East Carolina Railway bridge, mile 13.0 at Newport, need not be opened for the passage of vessels.
§ 117.829 Northeast Cape Fear River.
(a) The draw of the Isabel S. Holmes Bridge, at mile 1.0, at Wilmington, North Carolina will operate as follows:
(1) The draw will be closed to pleasure craft from 6 a.m. to 6 p.m. every day except at 10 a.m. and 2 p.m. when the draw will open for all waiting vessels.
(2) The draw will open on signal for Government and commercial vessels at all times.
(3) The draw will open for all vessels on signal from 6 p.m. to 6 a.m.
(4) From 7 a.m. to 9 a.m. on the second Saturday of July of every year, from 12 p.m. to 11:59 p.m. on the last Saturday of October or the first or second Saturday of November of every year, and from 7 a.m. to 11 a.m. on the first or second Sunday of November of every year, the draw need not open for vessels to accommodate annual races.
(b) The CSX Hilton Railroad Bridge, mile 1.5 in Wilmington, NC shall operate as follows:
(1) The draw of the bridge to be remotely operated by the controller at the Navassa Railroad Bridge mile 34.0 across the Cape Fear River.
(2) The draw shall be left in the open position to vessels and will only be closed for the passage of trains and to perform periodic maintenance authorized in accordance with Subpart A of this part.
(3) Trains shall be controlled so that any delay in opening of the draw shall not exceed ten minutes except as provided in 117.31(b).
(4) The CSX Hilton Railroad Bridge shall not be operated by the controller at the CSX Navassa Railroad in the event of failure or obstruction of the motion sensors, laser scanners, video cameras or marine-radio communications. In these situations, a bridge tender must be called to operate the bridge on-site.
(5) When rail traffic has cleared, the horn will automatically sound one prolonged blast followed by one short blast to indicate that the CSX Hilton Railroad Bridge is moving to the full open position to vessels. During open span movement, the channel traffic lights will flash red, until the bridge is in the full open position to vessels. In the full open position to vessels, the bridge channel traffic lights will flash green, allowing vessels to pass safely.
(6) During closing span movement, the channel traffic lights will flash red, the horn will sound five short blasts, and an audio voice-warning device will announce bridge movement. Five short blasts of the horn will continue until the bridge is seated and locked down. When the bridge is seated and in the locked down position to vessels, the channel traffic lights will continue to flash red.
(c) The draw of the Seaboard System Railroad Bridge across the Northeast Cape Fear River, mile 27.0, at Castle Hayne, North Carolina shall open on signal if at least four hours notice is given.
[CGD05-02-014, 67 FR 70554, Nov. 25, 2002, as amended by CGD05-04-120, 69 FR 70061, Dec. 2, 2004; CGD05-05-102, 71 FR 5010, Jan. 31, 2006; USCG-2010-1139, 76 FR 30832, May 27, 2011; USCG-2012-0193, 77 FR 50378, Aug. 21, 2012]
§ 117.831 Pamlico and Tar Rivers.
The draw of the US17-264 bridge, mile 37.2 at Washington, shall open on signal if at least 24 hours notice is given. The bridge owners shall restore constant attendance when so directed by the District Commander.
[USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
§ 117.833 Pasquotank River.
(a) The draw of the Albemarle & Chesapeake railroad bridge, mile 47.7, at Elizabeth City, North Carolina, shall be maintained in the open position; the draw may close only for the crossing of trains and maintenance of the bridge. When the draw is closed, a bridgetender shall be present to reopen the draw after the train has cleared the bridge.
(b) The draw of the US 158 Highway Bridge, mile 50.7, at Elizabeth City, shall open on signal; except that between 7 a.m. and 9 a.m., and 4 p.m. and 6 p.m., Monday through Friday, the draw need open only at 7:30 a.m., 8:30 a.m., 4:30 p.m., and 5:30 p.m. for any pleasure vessels waiting to pass.
[CGD05-94-118, 60 FR 40098, Aug. 7, 1995, as amended by CGD05-97-009, 62 FR 66006, Dec. 17, 1997]
§ 117.835 Perquimans River.
The draw of the US17 bridge, mile 12.0 at Hertford, shall open on signal from 8 a.m. to midnight from April 1 through September 30 and from 10 a.m. to 10 p.m. from October 1 through March 31. The draw need not be opened at all other times.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984]
§ 117.843 Trent River.
The draw of the U.S. 70 Bridge, mile 0.0, at New Bern:
(a) Shall open on the hour and the half hour from 6 a.m. to 10 p.m., except during the times authorized in accordance with (a) (2) of this section.
(b) Shall remain closed from 7:30 a.m. to 8:30 a.m. and from 4:30 p.m. to 6 p.m., Monday through Friday; except holidays.
(c) Shall open on signal from 10 p.m. to 6 a.m.
(d) Shall open upon request at all times for vessels as defined in § 117.31.
[USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
92 Ohio
§ 117.847 Ashtabula River.
(a) The draw of the Fifth Street Bridge, mile 1.4, over the Ashtabula River shall open on signal for the passage of vessels on the hour and half hour, except from October 10 through May 1 when no drawtender is required to be in attendance and the bridge will open on signal with a 12-hour advance notice from vessels.
(b) The draw of the Norfolk Southern Railroad Bridge, mile 1.5, over the Ashtabula River shall open on signal and may be remotely operated. The bridge owner shall maintain and monitor a 2-way public address system, VHF-FM Marine Radio, and telephone. From October 10 through May 1 the bridge will open on signal with a 12-hour advance notice from vessels. The bridge shall display a sign readable from vessels approaching the bridge from upriver or down river and readable for 500 feet that states: the name of the bridge; the river mile; that the bridge is remotely operated; and that mariners may signal the bridge to open by sounding one prolonged blast followed by one short blast of the horn, calling via VHF-FM Marine Radio Channel 16, or by calling the number posted by the owner. The sign shall also include language notifying mariners that from October 10 through May 1 the bridge requires a 12-hour advance notice for openings by calling the number posted by the owner.
[USCG-2023-0189, 89 FR 14746, Feb. 29, 2024]
§ 117.848 Cleveland Harbor.
(a) The Norfolk Southern Railroad Bridge, mile 0.76, will open on signal.
(1) The bridge owner will maintain and monitor a VHF-FM Marine Radio, and telephone.
(2) The bridge will display a clock that counts down the estimated time of the next bridge opening that is visible to vessels approaching from the upriver or downriver side of the bridge.
(3) The bridge will also display a sign readable from vessels approaching the bridge from upriver or downriver and readable for 500 feet that states:
(i) the name of the bridge;
(ii) the river mile;
(iii) the opening signal of the bridge is one prolonged blast followed by one short blast of the horn or VHF-FM Marine Radio Channel 16, or by calling the number posted by the owner.
(b) All remaining moveable vehicle and railroad bridges on the Cuyahoga River will open on signal, except from December 15 through March 31 when the bridges will open if a 12-hour advance notice is provided. Said bridges include: Willow Avenue Bridge at Mile 1.02; Center Street Bridge, mile 1.28; the Columbus Road Bridge, mile 1.93; the Flats Industrial Railroad Bridge, mile 2.24; the City of Cleveland Railroad Bridge, mile 2.42; the Carter Road Bridge, mile 2.43; the Norfolk Southern Railroad Bridge the West 3rd Street Bridge, mile 3.42; the CSX Railroad Bridge, mile 4.75; the Cleveland Cliffs Railroad Bridge #1, mile 5.42; and the Wheeling & Lake Erie Railroad Bridge.
(c) The Voinovich Pedestrian Bridge, at the mouth of North Coast Harbor, will open on signal except from December 15 through March 31 when the bridge will open if a 12-hour advance notice is provided.
[USCG-2023-0188, 89 FR 46023, May 28, 2024]
§ 117.849 Muskingum River (Zanesville Canal).
The draw of the Conrail bridge, mile 77.1 at Zanesville, shall open on signal Tuesday through Friday if the Conrail office is notified by 12:01 p.m. on the day preceding the day the opening is required. For openings Saturday through Monday, the Conrail office shall be notified by 12:01 p.m. on Friday specifying which day and time the opening is required. In case of emergency, the draw shall open as soon as possible.
§ 117.850 Black River.
(a) The Charles Berry Bridge, mile 0.6, will open on signal, except from January 1 through March 31 when the bridge will open if a 12-hour advance notice is given. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.
(b) The Norfolk Southern Railroad Bridge, mile 1.2, will open on signal, except from January 1 through March 31 when the bridge will open if a 12-hour advance notice is given. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.
[USCG-2023-0187, 89 FR 24383, Apr. 8, 2024]
§ 117.851 Portage River.
(a) The draw of the Monroe Street bridge, mile 0.4 at Port Clinton, shall open as follows:
(1) From April 1 through November 30—
(i) Between the hours of 6 p.m. and 6 a.m., the draw shall open on signal.
(ii) Between the hours of 6 a.m. and 6 p.m., the draw shall open on signal. However, the draw need not open on signal during this time for recreational craft and commercial vessels licensed to carry six or less passengers. For these vessels, the draw need open only from five minutes before to five minutes after the hour and half-hour.
(2) From December 1 through March 31, the draw shall open on signal if at least 12 hours' notice is given.
(b) The draw of the Norfolk Southern Bridge, Mile 1.5 at Port Clinton, is remotely operated, is required to operate a radio telephone, and operate and answer a telephone, and shall open on signal. Except, from December 1 through March 31, the draw shall open on signal if at least 12-hours' notice is given.
[USCG-2023-0186, 89 FR 16693, Mar. 8, 2024]
§ 117.853 Sandusky Bay.
The draw of the Norfolk Southern Railroad Bridge, mile 3.5, is remotely operated, and is required, in addition to the other signals, to operate a radiotelephone and telephone and shall open on signal; except from October 31 through March 31 when it will open on signal if provided a 12-hours advance notice of arrival.
[USCG-2023-0185, 90 FR 13414, Mar. 24, 2025]
§ 117.855 Maumee River.
(a) The draw of the CSX Railroad Bridge, mile 1.07, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.
(b) The draw of the Wheeling and Lake Erie Railroad Bridge, mile 1.80, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio.
(c) The draw of the Craig Memorial Bridge, mile 3.30, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio.
(d) The draw of the Martin Luther King Jr Memorial Bridge, mile 4.30, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio.
(e) The draw of the Norfolk Southern Railroad Bridge, mile 5.76, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.
[USCG-2023-0184, 89 FR 24385, Apr. 8, 2024]
93 Oregon
§ 117.861 Blind Slough.
The draws of the Portland and Western railroad bridge, mile 1.1 at Knappa, shall open on signal if at least one hour notice is given. However, the draw shall open promptly on signal from four hours before to four hours after each day's authorized commercial fishing period established by the Columbia River Compact (Washington State Department of Fisheries and the Fish Commission of Oregon) for the Columbia River Fishery below Bonneville Dam.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000]
§ 117.865 Clatskanie River.
The draw of the Portland and Western railroad bridge, mile 0.7 at Clatskanie, shall open on signal if at least one hours notice is given. However, the draw shall open promptly on signal from four hours before to four hours after each day's authorized commercial fishing period established by the Columbia River Compact (Washington State Department of Fisheries and the Fish Commission of Oregon) for the Columbia River Fishery below Bonneville Dam.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2000-7223, 65 FR 40056, June 29, 2000]
§ 117.869 Columbia River.
(a) The draws of the Interstate 5 Bridges, mile 106.5, between Portland, OR, and Vancouver, WA, shall open on signal except that the draws need not be opened for the passage of vessels from 6:30 a.m. to 9 a.m. and from 2:30 p.m. to 6 p.m. Monday through Friday except federal holidays.
(b) The draw of the Port of Hood River bridge, mile 169.8 at Hood River, shall open on signal if at least 12 hours notice is given.
(c) The draw of the Burlington Northern Santa Fe railroad bridge, mile 201.2, between Celilo, Oregon, and Wishram, Washington, is automated and is normally maintained in the fully open-to-navigation position.
(1) Lights. All lights required for automated operation shall be visible to marine traffic for a distance of at least 2 miles and shall be displayed at all times, day and night.
(i) When the draw is fully open, a steady green light shall be displayed at the center of the drawspan on both upstream and downstream sides.
(ii) When the draw is not fully open, a steady red light shall be displayed at the center of the drawspan on both upstream and downstream sides.
(iii) When the draw is about to close, flashing yellow lights in the form of a down-pointing arrow shall be displayed at the center of the drawspan on both upstream and downstream sides.
(2) Operation. When a train approaches the bridge, the yellow lights shall start flashing. After an 8-minute delay, the green lights shall change to red, the drawspan shall lower and lock, and the yellow lights shall be extinguished. Red lights shall continue to be displayed until the train has crossed and the drawspan is again in the fully open position. At that time, the red lights shall change to green.
(3) Vessels equipped with radiotelephones may contact Burlington Northern Santa Fe to obtain information on the status of the bridge. Bridge status information also may be obtained by calling the commercial telephone number posted at the drawspan of the bridge.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CCGD13 85-02, 50 FR 31591, Aug. 5, 1985; CGD13-93-031, 60 FR 32268, June 21, 1995; CGD13-99-011, 65 FR 1544, Jan. 11, 2000]
§ 117.871 Coos Bay.
The draw of the Port of Coos Bay railroad bridge, mile 9.0 at North Bend, shall be maintained in the fully open position, except for the crossing of trains or maintenance.
[USCG-2009-0840, 75 FR 16006, Mar. 31, 2010]
§ 117.873 Coos River.
The draw of the Oregon State secondary highway bridge, mile 2.2 near Eastside, shall open on signal if at least 12 hours notice is given.
§ 117.875 Coquille River.
The draws of the US 101 highway bridge, mile 3.5 at Bandon, Oregon, need not be opened for the passage of vessels; however, the draws shall be restored to operable condition within 6 months after notification by the District Commander to do so.
[USCG-2014-0213, 80 FR 20439, Apr. 16, 2015]
§ 117.879 Isthmus Slough.
The draw of the Oregon State secondary highway bridge, mile 1.0, at Coos Bay, shall open on signal if at least 24 hours notice is given.
[CGD13-88-19, 54 FR 3448, Jan. 24, 1989]
§ 117.881 John Day River.
The draw of the Portland and Western railroad bridge, mile 0.0 near Astoria, shall open on signal if at least one hour notice is given. However, the draw shall open promptly on signal from four hours before to four hours after each day's authorized commercial fishing period established by the Columbia River Compact (Washington State Department of Fisheries and the Fish Commission of Oregon) for the Columbia River Fishery below Bonneville Dam.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 91-07, 56 FR 67528, Dec. 31, 1991; USCG-2000-7223, 65 FR 40056, June 29, 2000; USCG-2001-10881, 71 FR 70312, Dec. 4, 2006]
§ 117.887 Oregon Slough (North Portland Harbor).
The draw of the Burlington Northern Santa Fe railroad bridge, mile 3.2 at Portland, shall open on signal if at least one half hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-13, 49 FR 35627, Sept. 11, 1984]
§ 117.889 Siuslaw River.
(a) The draw of the US101 bridge, mile 5.0 at Florence, shall open on signal if at least two hours notice is given.
(b) The draw of the Central Oregon and Pacific railroad bridge, mile 8.0 near Cushman, shall open on signal if at least 24 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998]
§ 117.892 South Slough.
The drawspan for the Oregon State Highway Drawbridge across South Slough at Charleston must open on signal for the passage of vessels, except that between the hours of 7 a.m. and 7 p.m., from June 1 through September 30, the drawspan need be opened only on the hour and half-hour. This exception does not apply to commercial tugs and/or tows or public vessels of the United States.
[USCG-2001-10881, 71 FR 70312, Dec. 4, 2006]
§ 117.893 Umpqua River.
(a) The draws of the US 101 Bridge, mile 11.1, (541) 888-4340, and the Umpqua River railroad bridge, mile 11.5, (877) 928-5924, at Reedsport, Oregon, shall open on signal if at least two hours' notice is given via telephone.
(b) The draw of the Lower Smith River Road bridge across the side channel of the Umpqua River, mile 11.1 near Reedsport, need not be opened for the passage of vessels.
[USCG-2023-0969, 90 FR 5634, Jan. 17, 2025]
§ 117.895 Wallooskee River.
The draw of the Oregon State secondary highway bridge, mile 1.0 near Astoria, shall open on signal if at least 48 hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 37382, Sept. 24, 1984]
§ 117.897 Willamette River.
(a) The draws of the Union Pacific railroad bridge, mile 119.6 at Albany; and mile 164.3 near Harrisburg, need not open for the passage of vessels. However the draws shall be returned to operable condition within six months after notification by the District Commander to do so.
(b) The draw of the Oregon State highway bridge, mile 132.1 at Corvallis, shall open on signal if at least seven days notice is given. However, the draw need not be opened on Saturdays, Sundays, and Federal Holidays.
(c) The draws of the bridges listed in paragraph (c)(3) of this section shall open on signal if appropriate advance notice is given to the drawtender of the Hawthorne Bridge subject to the following requirements and exceptions:
(1) The draws need not open for the passage of vessels from 7 a.m. to 9 a.m. and 4 p.m. to 6 p.m. every Monday through Friday; except that on New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, and Christmas Day, the draws shall open in accordance with the notice requirements of paragraph (c)(3) below.
(2) During Rose Festival Week or when the water elevation reaches and remains above + 12 feet, no advance notice is required to request opening, except during the normal closed periods in (c)(1) above.
(3)(i) Broadway Bridge, mile 11.7, from 8 a.m. to 5 p.m. Monday through Friday, one hour's notice shall be given for draw openings. At all other times, notice of at least two hours in advance is required.
(ii) Steel Bridge (upper deck only), Portland, mile 12.1. From 8 a.m. to 5 p.m. Monday through Friday, one hour's notice shall be given for draw openings. At all other times, two hours notice is required.
(iii) Burnside Bridge, mile 12.4, from 8 a.m. to 5 p.m. Monday through Friday, one hour's notice shall be given for draw openings. At all other times, two hours notice is required.
(iv) Morrison Bridge, Portland, mile 12.8, from 8 a.m. to 5 p.m. Monday through Friday, one hour's notice shall be given for draw openings. At all other times, two hours notice is required.
(v) Hawthorne Bridge, Portland, mile 13.1, no advance notice required.
[CGD13-05-023, 70 FR 73939, Dec. 14, 2005, as amended by USCG-2008-0721, 74 FR 5986, Feb. 4, 2009; USCG-2021-0778, 87 FR 10311, Feb. 24, 2022]
§ 117.899 Youngs Bay and Lewis and Clark River.
(a) The draw of the US101 (New Youngs Bay) highway bridge, mile 0.7, across Youngs Bay at Smith Point, shall open on signal for the passage of vessels if at least one half-hour notice is given to the draw tender at the Lewis and Clark River Bridge by marine radio, telephone, or other suitable means from 7 a.m. to 5 p.m. Monday through Friday. During all other times, including weekends from 5 p.m. on Friday until 7 a.m. on Monday, and all Federal holidays except Columbus Day, the draw shall open on signal if at least a two-hour notice is given to the Oregon Department of Transportation (ODOT) by telephone. The opening signal shall be two prolonged blasts followed by one short blast.
(b) The draw of the Oregon State (Old Youngs Bay) highway bridge, mile 2.4, across Youngs Bay foot of Fifth Street, shall open on signal for the passage of vessels if at least one half-hour notice is given to the draw tender at the Lewis and Clark River Bridge by marine radio, telephone, or other suitable means from 7 a.m. to 5 p.m. Monday through Friday. During all other times, including weekends from 5 p.m. on Friday until 7 a.m. on Monday, and all Federal holidays except Columbus Day, the draw shall open on signal if at least a two-hour notice is given to ODOT by telephone. The opening signal shall be two prolonged blasts followed by one short blast.
(c) The draw of the Oregon State (Lewis and Clark River) highway bridge, mile 1.0, across the Lewis and Clark River, shall open on signal for the passage of vessels if at least one half-hour notice is given by marine radio, telephone, or other suitable means from 7 a.m. to 5 p.m. Monday through Friday. During all other times, including weekends from 5 p.m. on Friday until 7 a.m. on Monday, and all Federal holidays except Columbus Day, the draw shall open on signal if at least a two-hour notice is given to ODOT by telephone. The opening signal shall be two prolonged blasts followed by four short blast.
[USCG-2018-0131, 84 FR 18142, Apr. 30, 2019]
94 Pennsylvania
§ 117.901 Chester Creek.
The draw of the Front Street bridge, mile 0.1 at Chester, shall open on signal if at least 24 hours notice is given.
§ 117.903 Darby Creek.
The draw of the Conrail railroad bridge, mile 0.25, at Essington, shall operate as follows:
(a) The bridge will be operated remotely by the South Jersey Train Dispatcher located in Mt. Laurel, NJ. Operational information will be provided 24 hours a day by telephone at (856) 231-2282.
(b) From April 1 through October 31, the draw shall be left in the open position and will only be lowered for the passage of trains and to perform periodic maintenance authorized in accordance with subpart A of this part.
(c) From November 1 through March 31, the draw shall open on signal if at least 24 hours notice is given by telephone at (856) 231-2282. Operational information will be provided 24 hours a day by telephone at (856) 231-2282.
(d) The timeframe to initiate the bridge closure will be not more than 10 minutes before a train will arrive at the bridge location. If a train, moving toward the bridge has crossed the home signal for the bridge, the train may continue across the bridge and must clear the bridge prior to stopping for any reason. Trains shall be controlled so that any delay in opening of the draw shall not exceed fifteen minutes except as provided in § 117.31(b).
(e) The bridge will be equipped with cameras and channel sensors to visually and electronically ensure the waterway is clear before the bridge closes. The video and sensors are located and monitored at the remote operating location in Mt. Laurel, NJ. The channel sensors signal will be a direct input to the bridge control system. In the event of failure or obstruction of the infrared channel sensors, the bridge will automatically stop closing and the South Jersey Train Dispatcher will return the bridge to the open position. In the event of video failure the bridge will remain in the full open position.
(f) The Conrail Railroad center span light will change from fixed green to flashing red anytime the bridge is not in the full open position.
(g) Prior to downward movement of the span, the horn will sound two prolonged blasts, followed by a pause, and then two short blasts until the bridge is seated and locked down. At the time of movement, the center span light will change from fixed green to flashing red and remain flashing until the bridge has returned to its full open position.
(h) When the train controller at Mt. Laurel has verified that rail traffic has cleared, they will sound the horn five times to signal the draw is about to return to its full open position.
(i) During upward movement of the span, the horn will sound two prolonged blasts, followed by a pause, and then sound two short blasts until the bridge is in the full open position. The center span light will continue to flash red until the bridge is in the fully open position.
(j) When the draw cannot be operated from the remote site, a bridge tender must be called to operate the bridge in the traditional manner. Personnel shall be dispatched to arrive at the bridge as soon as possible, but not more than one hour after malfunction or disability of the remote system.
[USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
§ 117.904 Delaware River.
See § 117.716, Delaware River, listed under New Jersey.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
§ 117.905 Schuylkill River.
(a) The following requirements apply to all drawbridges across the Schuylkill River:
(1) The draws of railroad bridges need not be opened when there is a train in the bridge block approaching the bridge with the intention of crossing, or within five minutes of the known time of the passage of a scheduled passenger train.
(2) The opening of a bridge may not be delayed more than five minutes for a highway bridge or 10 minutes for a railroad bridge, after the signal to open is given.
(3) The owners of drawbridges shall provide and keep in good legible condition two board gages painted white with black figures not less than six inches high to indicate the vertical clearance under the closed draw at all stages of the tide. The gages shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream.
(b) The Passyunk Avenue bridge, mile 3.5 at Philadelphia, shall open on signal at all times if at least four hours notice is given. Public vessels of the United States shall be passed as soon as possible at any time.
(c) The draw of the Conrail bridge, mile 5.5 at Grays Ferry Avenue, Philadelphia, shall open on signal; except that, on Saturdays and Sundays, the draw shall open on signal if at least two hours notice is given. Public vessels of the United States shall be passed as soon as possible at any time.
(d) The draw of the University Avenue bridge, mile 6.2 at Philadelphia, shall open on signal at all times if at least two hours notice is given. Public vessels of the United States shall be passed as soon as possible at any time.
(e) The draw of the CSX Bridge, mile 6.4 near Christian Street, Philadelphia, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 43462, Oct. 29, 1984, as amended by USCG-2012-0625, 77 FR 63729, Oct. 17, 2012]
95 Rhode Island [Reserved]
96 South Carolina
§ 117.911 Atlantic Intracoastal Waterway, Little River to Savannah River.
(a) General. Public vessels of the United States and tugs with tows, upon proper signal, will be passed through the drawspan of each drawbridge listed in this section at anytime.
(b) Little River Bridge across Upper Litte River, mile 347.3, at North Myrtle Beach. The draw shall open on signal, except that from 7 a.m. to 9 a.m. and 4 p.m. to 6 p.m., Monday through Friday, except Federal holidays, the draw will open on the hour and half-hour.
(c) Ben Sawyer (SR 703) bridge across Sullivan's Island Narrows, mile 462.2 between Sullivan's Island and Mount Pleasant. The draw shall open on signal; except that, the draw need not open from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. Monday through Friday except Federal holidays. On Saturdays, Sundays, and Federal holidays from 9 a.m. to 7 p.m. the draw need open only on the hour.
(d) SR 171/700 (Wappoo Cut) Bridge across Wappoo Creek, mile 470.8, at Charleston, SC. The draw shall open on signal; except that the draw need not open from 6 a.m. to 9:29 a.m. and 3:31 p.m. to 7 p.m., Monday through Friday, except Federal holidays. Between 9:30 a.m. and 3:30 p.m., Monday through Friday, except Federal holidays, the draw need open only once an hour on the half hour.
(e) Lady's Island (Woods Memorial) Bridge, across the Beaufort River, mile 536.0, at Beaufort, SC. The draw shall operate as follows:
(1) Monday through Friday, except Federal holidays:
(i) From 6 a.m. to 9:29 a.m. and 3:31 p.m. to 7 p.m., the draw need not open to navigation; and,
(ii) Between 9:30 a.m. and 3:30 p.m., the draw need open only once an hour on the half hour.
(2) At all other times the draw shall open on signal.
[CGD7 84-29, 50 FR 51250, Dec. 16, 1985]
Editorial Note:For Federal Register citations affecting § 117.911, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.913 Ashepoo River.
The draw of the Seaboard System Railroad bridge, mile 32.0 at Ashepoo, need not be opened for the passage of vessels. However, the draw shall be returned to operable condition within six months after notification by the District Commander to do so.
§ 117.915 Ashley River.
(a) The draws of the US17 Highway Bridges (Ashley River Bridges), mile 2.4 and 2.5 at Charleston, SC shall open on signal; except that, from 4 p.m. to 9 a.m. daily, the draws shall open only if at least 12 hours notice is given. The draws of either bridge shall open as soon as possible for the passage of vessels in an emergency involving danger to life or property.
(b) The draw of the Seaboard System Railroad bridge, mile 12.0 near Drayton Hall, shall open on signal from 7 a.m. to 11 p.m. From 11 p.m. to 7 a.m., the draw shall open on signal if at least three hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2016-0776, 82 FR 59519, Dec. 15, 2017]
§ 117.923 Congaree River.
The draw of the Southern Railway bridge, mile 4.3 at Moye's Station, shall open on signal if at least 24 hours notice is given.
§ 117.925 Cooper River.
The draw of the Seaboard System Railroad bridge, mile 42.8 near Cordesville, shall open on signal if at least six hours advance notice is given.
[CGD 7-85-24, 50 FR 37175, Sept. 12, 1985]
§ 117.929 Durham Creek.
The removable span of the Seaboard System Railroad bridge, mile 1.7 at Bushy Park, shall be removed to allow the passage of dredges and construction equipment if at least 20 days notice is given. When notified by the City of Charleston of an emergency in the Bushy Park Reservoir, the span shall be removed as soon as possible to permit the passage of dredges and construction equipment.
§ 117.936 Savannah River.
See § 117.371, Savannah River, listed under Georgia.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
§ 117.938 Waccamaw River.
The draw of the Waccamaw Coast Line Railroad bridge, mile 44.4 at Conway, shall open on signal; except that from 8 a.m. to 6 p.m. Monday through Friday, the draw shall open on signal if at least one hour notice is given.
[CGD7-90-80, 56 FR 1491, Jan. 15, 1991]
97 South Dakota
§ 117.941 Missouri River.
The draws of the US81 bridge, mile 805.7 at Yankton, and the Chicago and Northwestern Railroad bridge, mile 1066.5 at Pierre, need not be opened for the passage of vessels.
98 Tennessee
§ 117.943 Cumberland River.
The draw of the Clarksville Railroad bridge over the Cumberland River, mile 126.5, at Clarksville, shall open on signal when the vertical clearance under the navigational span is 47 feet or less. The draw shall open on signal if at least two hours notice is given when the vertical clearance is greater than 47 feet. The draw need not be opened for a vessel that arrives at the bridge more than 30 minutes after the time specified in the notice, unless a second two hours notice has been given.
[CGD02 86-01, 51 FR 32319, Sept. 11, 1986, as amended by USCG-1998-3799, 63 FR 35527, June 30, 1998]
§ 117.949 Tennessee River.
The draws of the Chief John Ross Bridge over the Tennessee River, mile 464.1, at Chattanooga, and the Southern Railway Bridge over the Tennessee River, mile 470.7, at Hixon, Tennessee, shall open on signal when the vertical clearance beneath the draw is 50 feet or less. When the vertical clearance beneath the draw is more than 50 feet, at least eight hours notice is required. When the operator of a vessel returning through the draw within four hours informs the drawtender of the probable time of return, the drawtender shall return one half hour before the time specified and promptly open the draw on signal for the vessel without further notice. If the vessel giving notice fails to arrive within one hour after the arrival time specified, whether upbound or downbound, a second eight hours notice is required.
[CGD02 86-02, 51 FR 32320, Sept. 11, 1986; 51 FR 41894, Nov. 19, 1986, as amended by USCG-2001-10881, 71 FR 70312, Dec. 4, 2006]
99 Texas
§ 117.951 Arroyo Colorado River.
The draw of the S106 highway bridge, mile 22.5 at Rio Hondo, shall open on signal if at least 12 hours notice is given.
§ 117.953 Brazos River (Diversion Channel).
(a) The draw of the S36 highway bridge, mile 4.4 at Freeport, shall open on signal if at least 12 hours notice is given.
(b) The draw of the Union Pacific railroad bridge, mile 22.6 at Brazoria, need not be opened for the passage of vessels.
§ 117.955 Buffalo Bayou.
The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours' notice if given.
[USCG-2025-1113, 91 FR 3036, Jan. 26, 2026]
§ 117.959 Chocolate Bayou.
The draw of the Union Pacific railroad bridge, mile 11.4 at Liverpool, need not be opened for the passage of vessels.
§ 117.965 Cow Bayou.
The draws of the Orange County highway bridge, mile 2.9 at West Orange, and the S87 bridge, mile 4.5 at Bridge City, shall open on signal if at least six hours notice is given.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2012-0306, 77 FR 37315, June 21, 2012]
§ 117.966 Galveston Channel.
The drawspan for the Pelican Island Causeway Drawbridge across Galveston Channel, mile 4.5 of the Galveston Channel, (GIWW mile 356.1) at Galveston, Texas, must open on signal; except that, from 6:40 a.m. to 8:10 a.m., 12 noon to 1 p.m., and 4:15 p.m. to 5:15 p.m. Monday through Friday except Federal holidays, the drawspan need not be opened for passage of vessels. Public vessels of the United States must be passed at anytime.
[USCG-2001-10881, 71 FR 70312, Dec. 4, 2006. Redesignated by USCG-2011-0257, 76 FR 31837, June 2, 2011]
§ 117.967 Greens Bayou.
The draw of the Port Terminal Railroad Association railroad bridge, mile 2.8 at Houston, shall open on signal if at least four hours notice is given. The draw shall open on signal for three hours thereafter for returning downbound vessels.
§ 117.968 Gulf Intracoastal Waterway.
The drawspan for the Port Isabel Drawbridge, mile 666.0, must open on signal; except that, from 5 a.m. to 8 p.m. on weekdays only, excluding federal, state, and local holidays, the drawspan need open only on the hour for pleasure craft. The drawspan must open on signal at anytime for commercial vessels. When the drawspan is open for a commercial vessel, waiting pleasure craft must be passed.
[USCG-2001-10881, 71 FR 70312, Dec. 4, 2006]
§ 117.971 Neches River.
(a) The draw of the Kansas City Southern automated bridge, mile 19.5, at Beaumont, is not constantly manned and is operated from a remote site in Shreveport, Louisiana. The bridge is normally maintained in the closed to navigation position, providing 13 feet of vertical clearance above mean high tide. This bridge will open on signal.
(1) Mariners may request a bridge opening at anytime via one of the following methods:
(i) Telephone at 1-800-892-6295;
(ii) Marine radio on VHF-FM Channel 16; or
(iii) Proper sound signal as prescribed in § 117.15.
(2) When signaling by sound, if return sound signal is not sent from the remote bridge operator, in compliance with § 117.15, contact the remote operator via telephone or marine radio.
(3) An audible warning siren will sound when the bridge is in motion. Video cameras will constantly monitor the waterway near and under the draw. Once a vessel has passed through the bridge, the draw will lower, provided the infrared “under bridge” presence detector and video cameras reveal nothing under the draw.
(b) The draw of the Burlington Northern Santa Fe railroad bridge, mile 53.9 at Evadale, need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 08-00-026, 65 FR 71059, Nov. 29, 2000; USCG-2011-0257, 76 FR 31837, June 2, 2011]
§ 117.975 Old Brazos River.
The draw of the Union Pacific railroad bridge, mile 4.4 at Freeport, shall be maintained in the fully open position, except for the crossing of trains or for maintenance.
§ 117.981 Sabine River.
See § 117.493, Sabine River, listed under Louisiana.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
§ 117.984 San Bernard River.
The draw of the Union Pacific railroad bridge, mile 20.7 near Brazoria, shall open on signal; except that, from 10 a.m. to 2 p.m. and 10 p.m. to 2 a.m., the draw shall open on signal if at least three hours notice is given.
[CGD 08-84-14, 50 FR 15743, Apr. 22, 1985]
§ 117.988 Taylor Bayou Outfall Canal (Joint Outfall Canal (JOC)).
The draw of the Valero Bridge, mile 2.44, at the Valero facility in West Port Arthur, shall operate as follows:
(a) The draw shall be unmanned and maintained in the fully open-to-navigation position, except 6:30 a.m. through 7:30 a.m. and 5:30 p.m. through 6:30 p.m. daily.
(b) One hour prior to closing, a broadcast will be made warning of the impending closure on VHF-FM channels 16 and 13.
(c) 10 minutes prior to closing, the broadcast will be repeated warning of the impending closure on VHF-FM channels 16 and 13.
(d) The crewmember/tender will monitor the portable marine radio on approach to the bridge. When work crew approaches the bridge, it will stop and the crewmember/tender will observe the waterway for approaching vessels. If vessels are observed approaching the bridge, they will be allowed to pass prior to closing the bridge.
(e) An audible alarm will be heard during the opening and closing sequences of the bridge.
(f) Emergency marine traffic will be allowed to pass upon request. The bridge will require up to 30 minutes to cycle to allow for the passage of vessels. This request can be made on VHF-FM channel 16.
(g) If the bridge is required to operate outside of the specified times, the bridge will be tended until it is returned to the open-to-navigation position.
[USCG-2014-0386, 79 FR 56654, Sept. 23, 2014, as amended by USCG-2014-0386, 80 FR 22103, Apr. 21, 2015]
§ 117.989 Trinity River.
The draws of the Union Pacific Railroad bridges, mile 117.3 at Goodrich, mile 181.8 at Riverside, and the Burlington Northern Santa Fe railroad bridge, mile 96.2 at Romayor, need not be opened for the passage of vessels.
[USCG-2025-1113, 91 FR 3037, Jan. 26, 2026]
§ 117.991 Victoria Barge Canal.
The draw of the Victoria Barge Canal Railroad Bridge across Victoria Barge Canal, mile 29.4, at the Bloomington, Victoria County, Texas, shall operate as follows:
(a) The draw shall be unmanned and when a vessel with AIS equipment onboard approaches the two-mile post, the dispatcher will receive a prompt to open the bridge, if required, because a vessel is approaching. The vessel may continue to transit the waterway, but must tune their radiotelephone to VHF-FM channel 13 and receive passing instructions from the railroad dispatcher. The dispatcher must contact the vessel promptly to provide passing instruction to insure the continued safe transit of the vessel. Vessels without AIS equipment or vessels with AIS who would prefer to call via telephone, may call the railroad dispatcher at 800-262-4691 to arrange passing instructions.
(b) When any vessel approaches the one-mile post, the railroad dispatcher should have either cleared the vessel through the bridge or given an indication that a train is in the block and the vessel will be cleared as soon as practicable. If the vessel has not yet spoken with the railroad dispatcher, the vessel should immediately call the railroad dispatcher via telephone at 800-262-4691.
(c) If any vessel reaches the one-half mile post and has not communicated with the railroad dispatcher nor been cleared to proceed, the vessel should stop and contact either the railroad dispatcher at 800-262-4691 or the Port of Victoria emergency contact at 361-570-8855.
[USCG-2014-0952, 80 FR 39686, July 10, 2015]
100 Vermont
§ 117.993 Lake Champlain.
(a) The drawspan for each of the drawbridges listed in this section must open as soon as possible for the passage of public vessels of the United States.
(b) The draw of the US2 Bridge, mile 91.8, over Lake Champlain, between South Hero Island and North Hero Island, shall operate as follows:
(1) The draw shall open on signal on the hour and the half hour from May 15th through October 15th from 8 a.m. to 8 p.m. daily.
(2) The draw shall open on signal from May 15th through October 15th from 8 p.m. to 8 a.m. if at least four hours notice is given by calling the number posted at the bridge.
(3) The draw shall open on signal from October 16th through May 14th if at least four hours notice is given by calling the number posted at the bridge.
(c) The draw of the New England Central Railroad Bridge across Missiquoi Bay, mile 105.6, at Swanton, Vermont, shall operate as follows:
(1) From June 15 through September 15, the draw shall remain in the full open position at all times and shall only be closed for the passage of rail traffic or the performance of maintenance authorized in accordance with subpart A of this part.
(2) From September 16 through June 14, the draw may remain in the closed position and shall be opened on signal for the passage of vessel traffic after at least a twenty four hour notice is given by calling the number posted at the bridge.
(3) The draw may be operated either remotely by the New England Central Railroad train dispatcher located at St. Albans, Vermont or manually by a draw tender located at the bridge.
(4) A sufficient number of infrared cameras shall be maintained in good working order at all times with a clear unobstructed view of the channel under the bridge, and the up and down stream approaches to the bridge. A signal horn and message boards located both up and down stream, necessary to warn marine traffic that the bridge will be closing, shall also be maintained in good working order at all times. In the event that any of the cameras, navigation lights, horn, or message board become disabled, personnel shall be deployed to the bridge to be on scene within two hours from the known time of the equipment failure.
(5) The draw may operate remotely as follows: Once it is determined that the draw must be opened or closed, the train dispatcher shall observe the waterway both up and down stream via the infrared cameras to verify that the channel is clear of all approaching vessel traffic. All approaching vessel traffic shall be allowed to pass before the bridge may be closed. Once it is determined that no vessel traffic is approaching the dispatcher shall sound the warning horn and activate the up and down stream message boards indicating that the bridge will be closing. After at least a one minute delay the draw may then be closed and the swing span navigation lights shall display as red to indicate the bridge is in the closed position. Once the train clears the bridge the draw shall be returned to the full open position and the swing span lights shall display as green to indicate the draw is in the full open position.
(6) In the event that the dispatcher cannot verify that the channel is clear of all vessel traffic and the bridge cannot be safely closed, an on-scene train crewmember shall observe the waterway for any vessel traffic and then communicate with the train dispatch office either by radio or telephone to request the bridge be safely closed. Personnel shall then be deployed to the bridge to arrive within two hours to inspect and repair the bridge remote operation equipment.
(7) The bridge shall be operated manually from the tender's house located at the bridge until all necessary repairs are completed to the remote operation equipment.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD3 83-059, 49 FR 44208, Nov. 5, 1984; CGD01-98-032, 64 FR 28103, May 25, 1999; USCG-2001-10881, 71 FR 70312, Dec. 4, 2006; USCG-2012-0918, 78 FR 14446, Mar. 6, 2013]
101 Virginia
§ 117.995 Appomattox River.
The draw of the Seaboard System Railroad bridge, mile 2.5 at Hopewell, shall open on signal if at least 24 hours notice is given to the Seaboard System Agent at Hopewell. However, a drawtender shall be in constant attendance and the draw shall open on signal upon 30 days notice, in writing, to do so from the District Commander.
§ 117.997 Atlantic Intracoastal Waterway, South Branch of the Elizabeth River to the Albermarle and Chesapeake Canal.
(a) The draw of the Belt Line Railroad Bridge, mile 2.6, in Portsmouth and Chesapeake will operate as follows:
(1) The bridge will be left in the open position at all times and will only be lowered for the passage of trains and to perform periodic maintenance authorized in accordance with subpart A of this part.
(2) The bridge will be operated by the controller at the Berkley Yard office.
(3) The controller will monitor waterway traffic in the area of the bridge and directly beneath the bridge with closed circuit cameras mounted on top of the bridge and with surface navigational radar.
(4) When the bridge closes for any reason, the controller will announce 30 minutes in advance, 15 minutes in advance, and immediately proceeding the actual lowering, over marine channel 13, that the Belt Line Railroad Bridge is closing for river traffic. In each of these three announcements, the bridge/train controller will request all concerned river traffic to please acknowledge on marine channel 13.
(5) The bridge shall only be operated from the remote site if closed circuit visual and radar information shows there are no vessels in the area and no opposing radio communications have been received.
(6) While the Belt Line Bridge is moving from the full open position to the full closed position, the bridge/train controller will maintain constant surveillance of the navigational channel to ensure no conflict with maritime traffic exists. In the event of failure of a camera or the radar system, or loss of marine-radio communications, the bridge shall not be operated by the off-site bridge/train controller from the remote location.
(7) If the off-site bridge/train controller's visibility of the navigational channel is less than 3/4 of a mile, the bridge shall not be operated from the remote location.
(8) When the draw cannot be operated from the remote site, a bridgetender must be called to operate the bridge in the traditional on-site manner.
(9) The Belt Line mid-channel lights will change from green to red anytime the bridge is not in the full open position.
(10) During the downward and upward span movement, a warning alarm will sound until the bridge is seated and locked down or in the full open position.
(11) When the bridge has returned to its full up position, the mid-channel light will turn from red to green, and the controller will announce over marine radio channel 13, “Security, security, security, the Belt Line bridge is open for river traffic.” Operational information will be provided 24 hours a day on marine channel 13 and via telephone 757-271-1741 or 757-633-2241.
(b) The draw of the Norfolk and Western railroad bridge across the South Branch of the Elizabeth River, mile 3.6 at Portsmouth-Chesapeake, shall be maintained in the open position; except the draw may close for the crossing of trains and maintenance of the bridge. When the draw is closed, a drawtender shall be present and the draw shall open on signal.
(c) The draw of the Gilmerton (US13/460) bridge, mile 5.8, in Chesapeake:
(1) Shall open on signal at any time for commercial vessels carrying liquefied flammable gas or other hazardous materials.
(2) From 6:30 a.m. to 8:30 a.m. and from 3:30 p.m. to 5:30 p.m., Monday through Friday, except Federal holidays:
(i) Need not open for the passage of recreational vessels, or commercial vessels that do not qualify under paragraph (c)(2)(ii) of this section.
(ii) Need not open for commercial cargo vessels, including tugs, and tugs with tows, unless 2 hours advance notice has been given to the Gilmerton Bridge at 757-485-5567.
(3) Shall open on signal at all other times.
(d) The draw of the Norfolk Southern #7 Railroad Bridge, mile 5.8 in Chesapeake, shall operate as follows:
(1) The draw shall be remotely controlled by the operator at the Norfolk Southern #5 Railroad Bridge office over the Eastern Branch of the Elizabeth River, at mile 1.1, in Norfolk.
(2) The draw shall be left in the open position to vessels and will only be closed for the passage of trains and to perform periodic maintenance authorized in accordance with subpart A of this part.
(3) Trains shall be controlled so that any delay in opening of the draw shall not exceed ten minutes except as provided in § 117.31(b).
(4) Before the bridge closes for any reason, the off-site remote operator will monitor waterway traffic in the area with closed circuit cameras and motion sensors mounted on the bridge. The bridge will only be closed if the off-site remote operator's visual inspection shows that the channel is clear and there are no vessels transiting in the area.
(5) While the bridge is moving from the full open position to the full closed position, the off-site remote operator will maintain constant surveillance of the navigation channel to ensure that no conflict with maritime traffic exists. In the event of failure or obstruction, the off-site remote operator will stop and return the bridge to the full open position to vessels. In the event of a failure or obstruction, a bridge tender must be called by the off-site remote operator and must be on-site within 30 minutes of the call to operate the bridge.
(6) During closing of the span, the channel traffic lights will change from flashing green to flashing red, the horn will sound twice, and an audio voice warning device will announce bridge movement, then two repeat blasts of the horn will sound until the bridge is seated and locked down. When the bridge is seated and locked down to vessels, the channel traffic lights will flash red.
(7) During the open span movement, the channel traffic lights will flash red, the horn will sound twice, followed by a pause, and then five repeat blasts of the horn will sound until the bridge is in the full open position to vessels. In the full open position to vessels, the bridge channel traffic lights will turn from flashing red to flashing green then an audio warning device will announce bridge movement by stating “Security, security, security, the Norfolk Southern #7 Railroad Bridge at mile 5.8 is open for river traffic”.
(8) Operational information will be provided 24 hours a day on marine channel 13 and via telephone (757) 924-5320.
(e) The draw of the I64 bridge across the South Branch of the Elizabeth River, mile 7.1 at Chesapeake, shall open on signal if at least 24 hours notice is given.
(f) The draw of the S168 bridge, mile 12 at Chesapeake (Great Bridge), shall open on signal; except that, from 6 a.m. to 7 p.m., the draw need be opened only on the hour. If any vessel is approaching the bridge and cannot reach the draw exactly on the hour, the drawtender may delay the hourly opening up to 10 minutes past the hour for the passage of the approaching vessel and any other vessels that are waiting to pass. Vessels in an emergency condition which presents danger to life or property shall be passed at any time.
(g) The draw of the Albemarle & Chesapeake Railroad bridge, mile 13.9, in Chesapeake, Virginia, shall be maintained in the open position; the draw may close only for the crossing of trains and maintenance of the bridge. When the draw is closed, a bridgetender shall be present to reopen the draw after the train has cleared the bridge.
(h) The draw of the Centerville Turnpike (SR170) bridge across the Albemarle and Chesapeake Canal, mile 15.2, at Chesapeake:
(1) Shall open on signal at any time for commercial vessels carrying liquefied flammable gas or other hazardous materials.
(2) From 6:30 a.m. to 8:30 a.m. and from 4 p.m. to 6 p.m., Monday through Friday, except Federal holidays:
(i) Need not open for the passage of recreational or commercial vessels that do not qualify under paragraph (i)(2)(ii) of this section.
(ii) Need not open for commercial cargo vessels, including tugs, and tugs with tows, unless 2 hours advance notice has been given to the Centerville Turnpike bridge at (757) 547-3632.
(3) From 8:30 a.m. to 4 p.m., Monday through Friday, except Federal holidays, the draw need only be opened on the hour and half hour.
(4) If any vessel is approaching the bridge and cannot reach the draw exactly on the hour or half hour, the drawtender may delay the opening ten minutes past the hour or half hour for the passage of the approaching vessel and any other vessels that are waiting to pass.
(5) Shall open on signal at all other times.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984]
Editorial Note:For Federal Register citations affecting § 117.997, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 117.1005 Chincoteague Channel.
The draw of the SR 175 Bridge, mile 3.5, at Chincoteague shall open on demand; except from 7 a.m. to 5 p.m. on the last consecutive Wednesday and Thursday in July, the draw need not be opened.
[USCG-2014-0483, 81 FR 21268, Apr. 11, 2016]
§ 117.1007 Elizabeth River—Eastern Branch.
(a) The draw of the Norfolk Southern Railroad Bridge (NS #V2.8), mile 2.7 at Norfolk, shall operate as follows:
(1) The draw shall remain in the open position for navigation. The draw shall only be closed for train crossings or periodic maintenance authorized in accordance with subpart A of this part.
(2) The bridge shall be operated by the controller at the Norfolk Southern Railroad Bridge (NS #5), mile 1.1, over the Eastern Branch of the Elizabeth River in Norfolk, VA. The controller shall monitor vessel traffic with closed circuit cameras and infrared sensors covering the swing radius. Operational information will be provided 24 hours a day on marine channel 13 and via telephone (757) 446-5320.
(3) The bridge shall not be operated from the remote location in the following events: Failure or obstruction of the infrared sensors, closed-circuit cameras or marine-radio communications, or anytime controller's visibility is inhibited. In these situations, a bridge tender with Norfolk Southern must be called to operate the bridge on-site.
(4) Before the bridge closes for any reason, the remote operator will monitor waterway traffic in the area. The bridge shall only be closed if the off-site remote operator's visual inspection shows that the channel is clear and there are no vessels transiting in the area. While the bridge is moving, the operator shall maintain constant surveillance of the navigation channel.
(5) Before closing the draw, the channel traffic lights will change from flashing green to flashing red, the horn will sound five short blasts, and an audio voice warning stating, “Attention, Attention. Norfolk Southern's Railroad Bridge over the Eastern Branch of the Elizabeth River at milepost 2.7 will be closing to river traffic.” Five short blasts of the horn will continue until the bridge is seated and locked down to vessels, the channel traffic lights will continue to flash red.
(6) When the rail traffic has cleared, the horn will sound one prolonged blast followed by one short blast to indicate that the draw is opening to vessel traffic. During the opening swing movement, the channel traffic lights will flash red until the bridge returns to the fully open position. In the full open position to vessels, the bridge channel lights will flash green followed by an announcement stating, “Security, security, security. Norfolk Southern Railroad Bridge at mile 2.7 is open for river traffic.” Vessels shall stay clear of both channels as to not interfere with infrared detectors, until green lights are displayed on the swing span.
(b) The draw of the Berkley Bridge, mile 0.4 in Norfolk:
(1) Shall remain closed one hour prior to the published start of a scheduled marine event regulated under § 100.501 of this chapter, and shall remain closed until one hour following the completion of the event unless the Patrol Commander designated under § 100.501 of this chapter allows the bridge to open for commercial vessel traffic.
(2) Shall open on signal at any time for vessels carrying, in bulk, cargoes regulated by 46 CFR subchapters D or O, or Certain Dangerous Cargoes as defined in 33 CFR 160.202.
(3) For all other vessels, the draw shall open on signal at any time, except from 5 a.m. to 7 p.m., Monday through Friday, except Federal holidays. During these times, the draw shall:
(i) Open for commercial vessels with a draft of 18 feet or more, provided at least 6 hours notice was given to the Berkley Bridge Traffic Control room at (757) 494-2490.
(ii) Open on signal at 9 a.m., 11 a.m., 1 p.m. and 2:30 p.m.
(4) If the bridge is not opened during a particular scheduled opening per paragraph (b)(3)(ii) of this section and a vessel has made prior arrangements for a delayed opening, the draw tender may provide a single opening up to 30 minutes past that scheduled opening time for that signaling vessel, except at 2:30 p.m. The draw tender may provide a single opening up to 20 minutes past the 2:30 p.m. scheduled opening time for a signaling vessel that made prior arrangements for a delayed opening. A vessel may make prior arrangements for a delayed opening by contacting the Berkley Bridge Traffic Control room at (757) 494-2490.
[CGD 82-025, 49 FR 43463, Oct. 29, 1984, as amended by CGD 05-88-13, 53 FR 20321, June 3, 1988; CGD 5-89-43, 54 FR 30039, July 18, 1989; CGD5-90-023, 55 FR 23434, June 8, 1990; CGD05-04-209, 70 FR 22254, Apr. 29, 2005; CGD05-05-049, 70 FR 68337, Nov. 10, 2005; USCG-2009-0754, 75 FR 47464, Aug. 6, 2010; USCG-2012-0357, 77 FR 52604, Aug. 30, 2012; USCG-2005-21869, 80 FR 5330, Jan. 30, 2015]
§ 117.1021 North Landing River.
The draw of the S165 bridge, mile 20.2 at Chesapeake, shall open on signal; except that, from 6 a.m. to 7 p.m., the draw need be opened only on the hour and half hour for the passage of pleasure craft. Public vessels of the United States, commercial vessels, and vessels in an emergency endangering life or property shall be passed at any time.
§ 117.1023 Pamunkey River.
The draw of the Eltham Bridge (SR33/30) mile 1.0, located in West Point, Virginia shall open on signal if at least four hours notice is given at all times.
[USCG-2008-1175, 74 FR 29947, June 24, 2009]
§ 117.1025 York River.
(a) The Coleman Memorial bridge, mile 7.0, at Yorktown, shall open on signal; except from 5 a.m. to 8 a.m. and 3 p.m. to 7 p.m., Monday through Friday, except Federal holidays, the bridge shall remain closed to navigation.
(b) The bridge shall be opened at anytime for vessels in an emergency which presents danger to life or property.
[CGD05-93-054, 59 FR 5954, Feb. 9, 1994, as amended by CGD05-95-023, 60 FR 31247, June 14, 1995]
102 Washington
§ 117.1029 Chambers Bay.
The draw of the Chambers Bay railroad lift bridge, mile 0.01, at Chambers Bay, shall open on signal except between 10 p.m. to 6 a.m. The draw shall open on signal from 10 p.m. to 6 a.m. when at least four hours of notice has been given via the phone number displayed at the bridge, and as soon as possible, no later than 1 hour after notification, for vessels engaged in emergency response.
[USCG-2017-0695, 83 FR 24023, May 24, 2018]
§ 117.1031 Chehalis River.
The draw of the U.S. 101 highway bridge, mile 0.1, at Aberdeen shall open on signal if at least one-hour notice is given at all times by telephone to the Washington State Department of Transportation.
[USCG-2009-0959, 75 FR 16004, Mar. 31, 2010]
§ 117.1035 Columbia River.
(a) The term drawtender, as used in this section means the operator of the drawspan, whether that person may be a train crew member, maintenance person, or an officially designated drawtender.
(b) The draw of the semi-automated Union Pacific railroad bridge (Kalan Bridge), mile 323.4, near Kennewick, Washington, is normally maintained in the fully open position with no drawtender in attendance. A radar beacon (RACON) is located at the center of the drawspan. The RACON operates only when the drawspan is fully open, by responding with the Morse letter “K” to X-band radar signals. When necessary to close the drawspan for the passage of a train or for maintenance, a drawtender shall be dispatched to operate the draw from either of the remote control stations located at the ends of the bridge. Operation of the bridge shall be as follows:
(1) The drawtender shall broadcast a radio message over Channel 16-VHF to all vessels in the vicinity that the Kalan Bridge will be closing in two minutes. If after two minutes no response is received, the drawtender shall broadcast a message over Channel 13-VHF that the Kalan Bridge is closing. Both messages shall be broadcast twice.
(2) Prior to activating the closing sequence the drawtender shall visually inspect the waterway for marine traffic approaching the bridge. The closing sequence shall not be activated until after marine traffic has cleared the bridge.
(3) When the closing sequence is activated, the following functions occur automatically: The RACON is deactivated, red strobe lights on the lift towers and on the channel piers start flashing, a downward pointing arrow consisting of amber colored lights is displayed from the center of the drawspan and a recorded message is broadcast over Channel 13-VHF advising that the Kalan Bridge is closed to river traffic. The radio message is repeated every five minutes, the red lights continue to flash and the downward pointing arrow is displayed, until the lift span returns to the up and locked position. At the end of the ten minutes, a horn sounds for 30 seconds, the span begins closing and the centerspan navigation lights turn from green to red. The horn sounds for 30 seconds at 10 minute intervals, until the lift span returns to the up and locked position.
(4) If for any reason during the closing sequence a danger is posed to marine traffic, the closing sequence shall be stopped and the bridge reopened until the threat of danger has passed.
(5) If the bridge is to be temporarily closed for maintenance or for purposes other than the passage of a train, the drawtender shall continually monitor Channels 13 and 16 for calls from approaching vessels, and respond to inquiries from vessels about the closure.
(6) After a train has cleared the bridge, the following functions occur automatically: The drawspan returns to the fully open and locked position, the RACON is reactivated, the arrow display and the red strobe lights are extinguished, the red centerspan navigation lights return to green and a recorded message is broadcast over Channel 13-VHF that the Kalan Bridge is open for marine traffic.
(7) Bridge status information may be obtained by calling the commercial telephone number posted at the drawspan of the bridge.
(c) The draw of the Burlington Northern Santa Fe railroad bridge at mile 328.0, between Pasco and Kennewick, shall open on signal from 8 a.m. to 4 p.m. At all other times the draw shall open on signal if at least 2 hour's notice is given through the General Yardmaster, Pasco, Washington.
[CGD13 92-02, 57 FR 37712, Aug. 20, 1992]
§ 117.1037 Cowlitz River.
The draw of the Burlington Northern Santa Fe railroad bridge, mile 1.5, shall operate as follows:
(a) The draw shall open on signal if at least 24 hours notice is given.
(b) In the event of an emergency declared by the Cowlitz County Department of Emergency Services, the bridge shall be capable of opening upon two hours notice. Notification of emergencies and requests for openings during emergencies are initiated through the Cowlitz County Department of Emergency Services.
(c) The operating machinery of the draw shall be maintained in a serviceable condition and the draw shall be opened and closed at intervals frequent enough to make certain that the machinery is in proper order for satisfactory operation.
(d) During periods of fog or similar periods of reduced visibility, the drawtender, after acknowledging the signal to open, shall toll a bell continuously during the approach and passage of the vessel.
[USCG-2025-1113, 91 FR 3037, Jan. 26, 2026]
§ 117.1041 Duwamish Waterway.
(a) The draws of each bridge across the Duwamish Waterway shall open on signal, except as follows:
(1) From Monday through Friday, except all Federal holidays but Columbus Day, the draws of the First Avenue South Bridges, mile 2.5, need not be opened for the passage of vessels from 6 a.m. to 9 a.m. and from 3 p.m. to 6 p.m., except: The draws shall open at any time for a vessel of 5000 gross tons and over, a vessel towing a vessel of 5000 gross tons and over, and a vessel proceeding to pick up for towing a vessel of 5000 gross tons and over.
(2) The draw of the South Park Bridge, mile 3.8, need not be opened for the passage of vessels from 6:30 a.m. to 8:30 a.m. and from 3:30 p.m. to 5:30 p.m., Monday through Friday except, Federal holidays, other than Columbus Day.
(3) Between the hours of 11 p.m. and 7 a.m., Monday through Sunday, the South Park Bridge shall open if at least a 12 hour notice is given by telephone or VHF radio to the drawtender at the South Park Bridge. If emergency responders require a bridge opening between 11 p.m. and 7 a.m., the South Park Bridge shall open within 45 minutes from initial notification to the Fremont Bridge operator. Vessels engaged in sea-trials or dredging activities may request a standby drawtender to open the bridge, on demand, during sea-trials and/or dredging operations, if at least a 24 hour notice is given to the South Park Bridge drawtender.
(b) The following bridges shall open on the specified signals:
(1) Burlington Northern Santa Fe railroad bridge, mile 0.4, and Southwest Spokane Street bridge, mile 0.3, one prolonged blast followed quickly by three short blasts.
(2) Burlington Northern Santa Fe railroad bridge, mile 0.4, one prolonged blast followed quickly by one short blast.
(3) First Avenue South bridge, mile 2.5, three prolonged blasts.
(4) South Park highway bridge, mile 3.8, one prolonged blast followed quickly by one short blast and one prolonged blast.
(c) When fog prevails by day or by night, the drawtender of bridges listed in this section, after giving the acknowledging signal to open, shall toll a bell continuously during the approach and passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-14, 49 FR 35498, Sept. 10, 1984; CGD13 8-13, 49 FR 35628, Sept. 11, 1984; CGD13 84-12, 50 FR 10228, Mar. 14, 1985; CGD13 85-01, 50 FR 30271, July 25, 1985; CGD13 91-05, 56 FR 41284, Aug. 20, 1991; CGD13-99-005, 66 FR 33025, June 20, 2001; USCG-2002-12471, 67 FR 41332, June 18, 2002; USCG-2015-0285, 80 FR 81185, Dec. 29, 2015; USCG-2019-0404, 84 FR 28732, June 20, 2019]
§ 117.1045 Hood Canal.
The draw of the Washington State pontoon highway bridge near Port Gamble operates as follows:
(a) The draw shall open on signal if at least one hour's notice is given. The draw shall be opened horizontally for 300 feet unless the maximum opening of 600 feet is requested.
(b) The draw of the Hood Canal Bridge, mile 5.0, need not open for vessel traffic from 3 p.m. to 6:15 p.m. daily from 3 p.m. May 22 to 6:16 p.m. September 30, except for commercial tug and tow vessels and vessels of the U.S. Navy or vessels attending the missions of the U.S. Navy and other public vessels of the United States. At all other times the bridge will operate in accordance with paragraph (a) of this section.
(c) Telephone requests for bridge openings may be directed as collect calls to the Toll Office at the bridge site. The call may also be made by direct telephone communication through the Seattle Marine Operator, Station KOH, or through other marine wire or radio telephone service.
(d) During unusual or emergency periods, the authorized representative of the owner of or agency controlling the bridge shall open the draw on a demand basis for specified periods of time, normally not exceeding 48 hours, when requested by the Department of the Navy. While on a demand basis, a drawtender shall be in attendance on the bridge with radio communication equipment in operation.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-13, 49 FR 35628, Sept. 11, 1984; CGD13-95-011, 62 FR 43097, Aug. 12, 1997; USCG-2012-0074, 77 FR 28769, May 16, 2012]
§ 117.1047 Hoquiam River.
(a) When fog prevails by day or night, the drawtender of each bridge listed in this section, after giving the acknowledging signal to open, shall toll a bell continuously during the approach and passage of vessels.
(b) The draw of the Puget Sound and Pacific railroad bridge, mile 0.3 at Hoquiam, shall be maintained in the fully open position except for the passage of trains or for maintenance. When the draw of the bridge is closed and the visibility at the drawtender's station is less than one mile up or down the channel, the drawtender shall sound two long blasts every minute. When the draw is reopened, the drawtender shall sound one long blast followed by one short blast.
(c) The draw of the Simpson Avenue Bridge, mile 0.5, at Hoquiam, shall open on signal if at least one hour notice is given by telephone to the Washington State Department of Transportation. The opening signal is two prolonged blasts followed by one short blast.
(d) The draw of the Riverside Avenue Bridge, mile 0.9, at Hoquiam, shall open on signal if at least one hour notice is given by telephone to the Washington State Department of Transportation. The opening signal is two prolonged blasts followed by two short blasts.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-11, 49 FR 46548, Nov. 27, 1984; CGD13 85-15, 51 FR 2395, Jan. 16, 1986; CCGD13-93-019, 58 FR 44613, Aug. 24, 1993; USCG-2008-1095, 74 FR 12552, Mar. 25, 2009; USCG-2014-1029, 80 FR 18116, Apr. 3, 2015]
§ 117.1051 Lake Washington Ship Canal.
(a) When fog prevails by day or by night, the drawtender of each bridge listed in this section, after giving the acknowledging signal to open, shall toll a bell continuously during the approach and passage of vessels.
(b) All non-self-propelled vessels, craft, or rafts navigating this waterway for which the opening of any draw is necessary shall be towed by a suitable self-propelled vessel while passing the draw.
(c) The draw of the Burlington Northern Santa Fe railroad bridge, mile 0.1, shall open on signal.
(d) The draws of the Ballard Bridge, mile 1.1, Fremont Bridge, mile 2.6, and University Bridge, mile 4.3, shall open on signal, except that:
(1) The draws need not be opened for a period of up to 10 minutes after receiving an opening request, if needed to pass accumulated vehicular traffic. However, the draws shall open without delay, when requested by vessels engaged in towing operations.
(2) The draws need not open from 7 a.m. to 9 a.m. and from 4 p.m. to 6 p.m. Monday through Friday, except all Federal holidays but Columbus Day for any vessel of less than 1000 tons, unless the vessel has in tow a vessel of 1000 gross tons or over.
(3) Between the hours of 11 p.m. and 7 a.m. the draws shall open if at least one hour notice is given by telephone, radiotelephone, or otherwise to the drawtender at the Fremont Avenue Bridge.
(e) The draw of the Montlake Bridge, mile 5.2, shall open on signal, except that:
(1) The draw need not open for a period of up to 10 minutes after receiving an opening request, if needed to pass accumulated vehicular traffic. However, the draw shall open without delay, when requested by vessels engaged in towing operations.
(2) For any vessel or watercraft of less than 1,000 gross tons, unless the vessel has in tow a vessel of 1,000 gross tons or over, from Monday through Friday, except Federal Holidays:
(i) The draw need not open from 7 a.m. to 9 a.m. and from 3:30 p.m. to 6:30 p.m. from April 30 to September 1 and from 7 a.m. to 10 a.m. and from 3:30 p.m. to 7 p.m. from September 1 to April 30.
(ii) The draw need open only on the hour and half hour from 12:30 p.m. to 3:30 p.m. and from 6 p.m. to 6:30 p.m.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD 82-025, 49 FR 26722, June 29, 1984; CGD13 84-13, 49 FR 35628, Sept. 11, 1984; CGD13 86-02, 51 FR 18788, May 22, 1986; CGD 13 88-03, 53 FR 10535, April 1, 1988; CGD13 89-06, 54 FR 52798, Dec. 22, 1989; CGD 96-026, 61 FR 33664, June 28, 1996; CGD13-99-005, 66 FR 33026, June 20, 2001; CGD13-02-012, 68 FR 53051, Sept. 9, 2003]
§ 117.1053 Lewis River.
The draw of the Burlington Northern Santa Fe railroad bridge, mile 2.0 at Woodland, need not be opened for the passage of vessels.
§ 117.1055 Skagit River.
The draws of all bridges across the Skagit river need not be opened for the passage of vessels. However, the draws shall be returned to operable condition within one year after notification by the District Commander to do so.
§ 117.1058 Snake River.
(a) The draw of the Burlington Northern Santa Fe railroad bridge across the Snake River at mile 1.5 between Pasco and Burbank is automated and is normally maintained in the fully open to navigation position.
(b) Lights. All lights required for automated operation shall be visible for a distance of at least 2 miles and shall be displayed at all times, day and night.
(1) When the draw is fully open, a steady green light shall be displayed at the center of the drawspan on both upstream and downstream sides.
(2) When the draw is not fully open, a steady red light shall be displayed at the center of the drawspan on both upstream and downstream sides.
(3) When the draw is about to close, flashing yellow lights in the form of a down-pointing arrow shall be displayed at the center of the drawspan on both upstream and downstream sides.
(4) A similar set of red, green, and yellow lights shall be displayed on a remote lighting panel located near the north end, upstream side, of the Washington State highway bridge at mile 2.2. These lights shall be synchronized with the lights on the railroad bridge and shall be visible to vessels traveling downstream throughout the passage of the channel adjacent to Strawberry Island.
(c) Operation. When a train approaches the bridge, the yellow lights shall start flashing. After an eight-minute delay, the green lights shall change to red, the drawspan shall lower and lock, and the yellow lights shall be extinguished. Red lights shall continue to be displayed until the train has crossed and the drawspan is again in the fully open position. At that time, the red lights shall change green.
(d) Vessels equipped with radiotelephones may contact Burlington Northern Santa Fe to obtain information on the status of the bridge. Bridge status information also may be obtained by calling the commercial telephone number posted at the drawspan of the bridge.
[CGD13 84-05, 49 FR 43956, Nov. 1, 1984]
§ 117.1059 Snohomish River, Steamboat Slough, and Ebey Slough.
(a) Drawtenders of bridges listed in this section shall acknowledge sound signals as follows:
(1) When draw can be opened immediately, two prolonged blasts followed by one short blast or three loud and distinct strokes of a bell.
(2) When draw cannot be opened immediately, or when it is open and must be closed promptly, two prolonged blasts or two loud and distinct strokes of a bell. This signal may also be used by a vessel to countermand its call signal.
(b) When fog prevails by day or by night, the drawtender of each bridge listed in this section, after giving the acknowledging signal to open, shall toll a bell continuously during the approach and passage of vessels.
(c) The draws of the twin, SR 529, highway bridges across the Snohomish River, mile 3.6, at Everett shall open on signal if notice is provided at least one hour in advance. Notice for openings shall be given by marine radio, telephone or other means to the drawtender at the twin, SR 529, Highway Bridges across the Snohomish River, mile 3.6. One signal opens both draws. During freshets, a drawtender shall be in constant attendance, and the draws shall open on signal when so ordered by the District Commander.
(d) The draw of the Burlington Northern Santa Fe railroad bridge across Steamboat Slough, mile 1.0, near Marysville, shall open on signal if at least four hours notice is given. The opening signal is one prolonged blast followed by one short blast and one prolonged blast.
(e) The draws of the twin SR 529, highway bridges across Steamboat Slough, miles 1.1 and 1.2, near Marysville, shall open on signal if notice is provided at least four hours in advance. Notice for openings shall be given by marine radio or telephone to the drawtender at the twin, SR 529, Highway Bridges across the Snohomish River, mile 3.6. One signal opens both draws. During freshets, a drawtender shall be in constant attendance, and the draws shall open on signal when so ordered by the District Commander.
(f) The draw of the Burlington Northern Santa Fe Railroad Bridge across Ebey Slough, mile 1.5, near Marysville, WA, shall open on signal if at least four hours notice is given. The opening signal is one prolonged blast followed by one short blast. During freshets, a draw tender shall be in constant attendance, and the draw shall open on signal when so ordered by the District Commander.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-13, 49 FR 35628, Sept. 11, 1984; CGD13 85-10, 50 FR 25961, June 24, 1985; USCG-2018-0443, 83 FR 30039, June 27, 2018; USCG-2018-0128, 83 FR 65301, Dec. 20, 2018; USCG-2025-1113, 91 FR 3037, Jan. 26, 2026]
§ 117.1061 Tacoma Harbor.
(a) When fog prevails by day or night, the drawtender of each bridge listed in this section, after giving the acknowledging signal to open, shall toll a bell continuously during the approach and passage of vessels.
(b) The draw of the Murray Morgan Bridge, also known as the South 11th Street Bridge, across Thea Foss Waterway, previously known as City Waterway, mile 0.6, at Tacoma, shall open on signal if at least two hours notice is given. However, to obtain a bridge opening between 10 p.m. and 8 a.m. notification must be made to the City of Tacoma by 8 p.m. In emergencies, openings shall be made as soon as possible upon notification to the City of Tacoma.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 84-13, 49 FR 35629, Sept. 11, 1984; 49 FR 44632, Nov. 8, 1984; CGD 13-98-001, 63 FR 10777, Mar. 5, 1998; USCG-2012-0911, 78 FR 31414, May 24, 2013]
§ 117.1063 Willapa River South Fork.
(a) The draw of the Washington State Parks and Recreation Commission bridge across the South Fork Willapa River, mile 0.3, at Raymond, shall open on signal if at least 24 hours notice is given.
[USCG-2000-7223, 65 FR 40056, June 29, 2000]
§ 117.1065 Wishkah River.
(a) When fog prevails by day or by night, the drawtender of each bridge listed in this section, after giving the acknowledging signal to open, shall toll a bell continuously during the approach and passage of vessels.
(b) The draw of the Puget Sound and Pacific railroad bridge, mile 0.1 at Aberdeen, shall be maintained in the fully open position, except for the passage of trains or for maintenance. When the draw of the bridge is closed and the visibility at the drawtender's station is less than one mile up or down the channel, the drawtender shall sound two prolonged blasts every minute. When the draw is reopened, the drawtender shall sound one prolonged blast followed by one short blast.
(c) The draws of the Heron Street Bridge, mile 0.2 and the Wishkah Street Bridge, mile 0.4, at Aberdeen, shall open on signal if at least one hour notice is given by telephone to the Washington State Department of Transportation. The opening signal for both bridges is one prolonged blast followed by two short blasts.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD13 85-15, 51 FR 2395, Jan. 16, 1986; USCG-2008-1095, 74 FR 12553, Mar. 25, 2009]
103 Wisconsin
§ 117.1081 Black River.
The drawspan of the Canadian Pacific Railroad Bridge, mile 1.0, at La Crosse, Wisconsin is operated by remote operator located at the Canadian Pacific Railway Minneapolis Operations Center, in Minneapolis, Minnesota. Drawspan shall open upon demand by contacting remote operator via VHF-FM Channel 16 or telephone (612) 851-5784.
[USCG-2011-0937, 77 FR 69761, Nov. 21, 2012, as amended by USCG-2015-0433, 80 FR 44281, July 27, 2015]
§ 117.1083 Duluth-Superior Harbor (St. Louis River).
See § 117.669 St. Louis River (Duluth-Superior Harbor), listed under Minnesota.
[USCG-2017-0212, 82 FR 33803, July 21, 2017]
§ 117.1087 Fox River.
(a) The draws of the Fox Valley & Lake Superior Railroad Bridge, mile 1.03, Ray Nitschke Bridge, mile 1.58, Bart Starr Memorial Bridge, mile 1.81, Mason Street (Tilleman Memorial) Bridge, mile 2.27, and Fox Valley & Lake Superior Railroad Bridge, mile 3.31, all at Green Bay, shall open as follows:
(1) From April 1 through November 30, the draws shall open on signal for recreational vessels; except the draws need not open from 7 a.m. to 8 a.m., 12 noon to 1 p.m., and 4 p.m. to 5 p.m., Monday through Saturday except Federal holidays. Public vessels, tugs, and commercial vessels with a cargo capacity of 300 short tons or greater shall be passed at all times.
(2) From December 1 through March 31, the draws shall open on signal if notice is given at least 12 hours in advance of a vessels time of intended passage.
(3) The opening signal for the Ray Nitschke Bridge is two short blasts followed by one prolonged blast, for the Bart Starr Memorial Bridge one prolonged blast followed by two short blasts, and for the Mason Street Bridge one prolonged blast, followed by one short blast, followed by one prolonged blast.
(4) The Ray Nitschke Bridge, mile 1.58, the Bart Starr Memorial Bridge, mile 1.81, and the Tilleman Memorial Bridge, mile 2.27, are operated remotely.
(b) All drawbridges between mile 7.13 in DePere and mile 58.3 in Oshkosh, except the Fox Valley & Lake Superior Railroad Bridge at mile 55.72, shall open as follows:
(1) From April 27 through October 7, the draws shall open on signal, except between the hours of midnight and 8 a.m., the draws shall open if at least 2-hours advance notice is given.
(2) From October 8 through April 26, the draws shall open if at least 12-hours advance notice is given.
(3) All drawbridges between mile 37.52 and 58.01, are authorized to be operated remotely, and are required to operate and maintain a VHF-FM Marine Radio.
(c) The draw of the Fox Valley & Lake Superior Railroad Railroad Bridge at mile 55.72 shall open on signal, except from October 8 through April 26; the draw shall open if at least 12-hours advance notice is given. The bridge is authorized to be operated remotely. The owners of the bridge shall provide and keep in good legible condition two board gauges painted white with black figures to indicate the vertical clearance under the closed draw at all water levels. The gauges shall be so placed on the bridge that they are plainly visible to operators of vessels approaching the bridge either up or downstream. The bridge shall operate and maintain a VHF-FM Marine Radio. In addition to the required bridge lights, the owner's shall install and maintain alternating red lights in a horizontal line that mimic grade crossing lights and bell to warn mariners that the bridge is lowering.
(d) The draw of each bridge at or between Berlin and Portage need not open for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by CGD09-05-081, 70 FR 59657, Oct. 13, 2005; USCG-2016-0256, 81 FR 48329, July 25, 2016; USCG-2019-0178, 85 FR 6808, Feb. 6, 2020; USCG-2020-0304, 85 FR 58279, Sept. 18, 2020; USCG-2020-0056, 86 FR 39965, July 26, 2021; USCG-2021-0336, 87 FR 79257, Dec. 27, 2022; USCG-2024-1103, 90 FR 52877, Nov. 24, 2025]
§ 117.1089 Manitowoc River.
(a) The draws of the Eighth Street bridge, mile 0.29, and Tenth Street bridge, mile o.43, both at Manitowoc, shall open on signal except that:
(1) From April 1 through October 31, Monday through Friday, the bridges need not open from 6:50 a.m. to 7 a.m., 7:50 a.m. to 8 a.m., 11:55 a.m. to 12:10 p.m., and 12:45 p.m. to 1 p.m., except federal holidays. From 10:30 p.m. to 4:30 a.m. the draws shall open on signal if at least a 6 hour advance notice is given.
(2) From November 1 through March 31 the draws shall open on signal if at least a 12 hour advance notice is given.
(3) The opening signals for these bridges are:
(i) Eighth Street—one prolonged blast followed by one short blast.
(ii) Tenth Street—two short blasts followed by one prolonged blast.
(4) When signal is given by car ferry or other large vessel to pass either of the two bridges, the remaining bridge shall open promptly so that such vessels shall not be held between the two bridges.
(b) The draws of the Eighth Street Bridge, mile 0.29 and the Tenth Street Bridge, mile 0.43, over the Manitowoc River at Manitowoc, shall open on signal except that:
(1) From April 1 through November 30, Monday through Friday, the bridges need not open from 7 a.m. to 8 a.m., and 11 a.m. to 12 p.m., and again from 4 p.m. to 5 p.m., except federal holidays. From 10 p.m. to 4 a.m., the bridges will open on signal if provided a 2-hour advance notice of arrival.
(2) From December 1 through March 31 the draws shall open on signal if at least a 12-hour advance notice is given.
[CGD09-01-001, 66 FR 13434, Mar. 6, 2001, as amended by USCG-2015-0132, 80 FR 24816, May 1, 2015; USCG-2024-0407, 90 FR 21697, May 21, 2025]
§ 117.1091 Menomonee River.
The draw of the Ogden-First Street bridge, mile 0.4 at Marinette, shall open on signal from 7 a.m. to 11 p.m. from May 1 through October 31. From 11 p.m. to 7 a.m. from May 1 through October 31, the draw shall open on signal if at least two hours notice is given. From November 1 through April 30, the draw shall open on signal if at least 12 hours notice is given.
§ 117.1093 Milwaukee, Menomonee, and Kinnickinnic Rivers and South Menomonee and Burnham Canals.
(a) The draws of the bridges over the Milwaukee River shall operate as follows:
(1) The draws of the North Broadway Street bridge, mile 0.5, and North Water Street bridge, mile 0.6, and Michigan Street bridge, mile 1.1, shall open on signal; except that, from April 16th through November 1st, from 7:30 a.m. to 8:30 a.m. and from 4 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draws need not be opened, and from midnight to 7 a.m. Monday through Saturday except Federal holidays the bridges will open on signal if a 2-hour advance notice is provided.
(2) The draws of all other bridges across the Milwaukee River shall open on signal if at least 2-hours' notice is given except that, from April 16th through November 1st, from 7:30 a.m. to 8:30 a.m. and from 4 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draws need not be opened.
(3) The following bridges are remotely operated, are required to operate a radiotelephone, and shall open as noted in this section: St. Paul Avenue, mile 1.21, Clybourn Street, mile 1.28, Wells Street, mile 1.61, Kilbourn Street, mile 1.70, State Street, mile 1.79, Highland Avenue, mile 1.97, and Knapp Street, mile 2.14.
(4) No vessel documented 12 tons or greater shall be held between any bridge at any time and must be passed as soon as possible.
(5) From November 2nd through April 15th, all drawbridges over the Milwaukee River will open on signal if a 12-hour advance notice is provided.
(b) The draws of bridges across the Menomonee River and South Menomonee Canal operate as follows:
(1) The draw of the North Plankinton Avenue bridge across the Menomonee River, mile 1.08, and the Canadian Pacific Railroad bridge, mile 1.05, shall open on signal; except that, from April 16th through November 1st, from 7:30 a.m. to 8:30 a.m. and from 4 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draws need not be opened, and from midnight to 7 a.m. Monday through Friday except Federal holidays the bridges will open on signal if a 2-hour advance notice is provided.
(2) The draws of all other bridges across the Menomonee River and South Menomonee Canal shall open on signal if at least 2-hours' notice is given except that, from April 16th through November 1st, from 7:30 a.m. to 8:30 a.m. and from 4 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draws need not be opened.
(3) The following bridges are remotely operated, are required to operate a radiotelephone, and shall open as noted in this section: North Plankinton Avenue, mile 1.08, North Sixth Street, mile 1.37, and North Ember Lane, mile 1.95, all over the Menomonee River and South Sixth Street, mile 1.51, over the South Menomonee Canal.
(4) No vessel documented over 12 tons shall be held between any bridge at any time and must be passed as soon as possible.
(5) From November 2nd through April 15th, all drawbridges over the Menomonee River and South Menomonee Canal will open on signal if a 12-hour advance notice is provided.
(c) The draws of bridges across the Kinnickinnic River operate as follows:
(1) The draw of the Kinnickinnic Avenue bridge, mile 1.5, shall open on signal; except that, from April 16th through November 1st, from 7:30 a.m. to 8:30 a.m. and from 4 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draws need not be opened, and from midnight to 7 a.m. Monday through Friday, except Federal holidays, the bridges will open on signal if a 2-hour advance notice is provided.
(2) The draws of all other bridges across the Kinnickinnic River shall open on signal if at least 2-hours' notice is given except that, from April 16th through November 1st, from 7:30 a.m. to 8:30 a.m. and from 4 p.m. to 5:30 p.m. Monday through Friday, except Federal holidays, the draws need not be opened.
(3) The following bridges are remotely operated, are required to operate a radiotelephone, and shall open as noted in this section: The South First Street Bridge, mile 1.78.
(4) No vessel documented over 12 tons shall be held between any bridge at any time and must be passed as soon as possible.
(5) From November 2nd through April 15th, all drawbridges over the Kinnickinnic River will open on signal if a 12-hour advance notice is provided.
(d) The Canadian Pacific Railroad Bridge at Mile 1.74 over the Burnham Canal, and the Sixteenth Street Bridge, mile 2.14, over the Menomonee River are closed by regulation and do not need to open for the passage of vessels.
[USCG-2019-0824, 86 FR 53216, Sept. 27, 2021, as amended by USCG-2024-0018, 89 FR 78819, Sept. 26, 2024]
§ 117.1095 Root River.
(a) The draw of the Main Street bridge, mile 0.3 shall open on signal; except that, from April 1 through December 1 from 6 a.m. to 6 p.m., the draw need be opened only on the hour, 20 minutes after the hour, and 40 minutes after the hour to pass all accumulated vessels; and, from December 2 through March 31, the draw shall open on signal if at least two hours notice is given. At all times, public vessels of the United States, state or local vessels used for public safety, commercial vessels, and vessels in distress shall be passed as soon as possible.
(b) The draw of the State Street bridge, mile 0.5, shall open on signal; except that, from October 16 through April 30, the draw shall open on signal if at least two hours notice is given. At all times, public vessels of the United States, state or local vessels used for public safety, commercial vessels, and vessels in distress shall be passed as soon as possible.
§ 117.1097 Sheboygan River.
The draw of the Eighth Street bridge, mile 0.69 at Sheboygan, shall open as follows:
(a) From May 1 through October 31—
(1) Between the hours of 6 a.m. and 10 p.m., the bridge shall open on signal, except that:
(i) From 6:10 a.m. to 7:10 p.m., Monday through Saturday, the draw need open only at 10 minutes after the hour, on the half-hour, and 10 minutes before the hour; and
(ii) From Monday through Friday, except Federal holidays, the draw need not open between 7:30 a.m. and 8:30 a.m., between 12 p.m. and 1 p.m., and between 4:30 p.m. and 5:30 p.m.
(2) Between the hours of 10 p.m. and 6 a.m., the draw shall open on signal if at least 2 hours advance notice is provided.
(b) From November 1 through April 30, the draw shall open on signal if at least 12 hours advance notice is provided.
(c) At all times, the draw shall open as soon as possible for public vessels of the United States, state or local government vessels used for public safety, vessels in distress, vessels seeking shelter from rough weather, or any other emergency.
[CGD09-98-003, 63 FR 49288, Sept. 15, 1998]
§ 117.1099 St. Croix River.
See § 117.667, St. Croix River, listed under Minnesota.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
§ 117.1101 Sturgeon Bay.
The draws of the Bayview (State Route 42/57) and Michigan Street bridges, miles 3.0 and 4.3, respectively, at Sturgeon Bay, are remotely operated by the tender at Maple-Oregon bridge, mile 4.17, and shall open as follows:
(a) The Bayview (State Route 42/57) Bridge, mile 3.0 at Sturgeon Bay, shall open on signal, except from December 1 through March 14, the draw shall open on signal if notice is given at least 12 hours in advance of intended passage.
(b) The draw of the Maple-Oregon Bridge, mile 4.17 at Sturgeon Bay, shall open on signal, except as follows:
(1) From March 15 through December 31, need open on signal for recreational vessels only on the quarter hour and three-quarter hour, 24 hours a day, if needed. However, if more than 10 vessels have accumulated at the bridge, or vessels are seeking shelter from severe weather, the bridge shall open on signal. This drawbridge, along with the Michigan Street drawbridge, shall open simultaneously for larger commercial vessels, as needed.
(2) From January 1 through March 14, the draw shall open on signal if notice is given at least 12 hours in advance of intended passage.
(c) The draw of the Michigan Street Bridge, mile 4.3 at Sturgeon Bay, shall open on signal, except as follows:
(1) From March 15 through December 31, need open on signal for recreational vessels only on the hour and half-hour, 24 hours a day, if needed. However if more than 10 vessels have accumulated at the bridge, or vessels are seeking shelter from severe weather, the bridge shall open on signal. This drawbridge, along with the Maple-Oregon Street drawbridge, shall open simultaneously for larger commercial vessels, as needed.
(2) From January 1 through March 14, the draw shall open on signal if notice is given at least 12 hours in advance of intended passage.
[USCG-2011-1109, 77 FR 44142, July 27, 2012, as amended by USCG-2017-0050, 83 FR 8936, Mar. 2, 2018]
§ 117.1103 Upper Mississippi River.
See § 117.671, Upper Mississippi River, listed under Minnesota.
[CGD 92-015, 57 FR 37880, Aug. 21, 1992]
§ 117.1107 Wolf River.
The draw of the Canadian National Railroad Bridge, mile 27.8 at Gill's Landing, shall open on signal if at least 6-hours advance notice is provided from April 20 through October 15, and if at least 12-hours advance notice is provided from October 16 through April 19.
[USCG-2013-0252, 78 FR 53668, Aug. 30, 2013, as amended by USCG-2019-0823, 84 FR 65300, Nov. 27, 2019]
PART 118 BRIDGE LIGHTING AND OTHER SIGNALS
Authority: 33 U.S.C. 494; 14 U.S.C. 503, 544; DHS Security Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 75-046, 40 FR 24898, June 11, 1975, unless otherwise noted.
§ 118.1 General requirements.
All persons owning or operating bridges over the navigable waters of the United States or any international bridge constructed after March 23, 1906, shall maintain at their own expense the lights and other signals required by this part.
[CGD 84-022, 51 FR 16312, May 2, 1986]
§ 118.3 Incorporation by reference.
(a) In this part, portions or the entire text of certain standards and specifications are incorporated by reference as the governing requirements for materials, equipment, tests, or procedures to be followed. These standards and specification requirements specifically referred to in this part are the governing requirements for the subject matters covered, unless specifically limited, modified, or replaced by the regulations.
(b) These materials are incorporated by reference into this part under 5 U.S.C. 552(a) with the approval of the Director of the Federal Register. The Office of the Federal Register publishes a table, “Material Approved for Incorporation by Reference,” which appears in the Finding Aids section of this volume. In that table are found citations to the particular sections of this part where the material is incorporated. To enforce any edition other than the one listed in paragraph (c) of this section, notice of the change must be published in the Federal Register and the material made available. All approved material is available for inspection at Coast Guard Headquarters. Contact Commandant (CG-BRG), Attn: Office of Bridge Programs, U.S. Coast Guard Stop 7418, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7418, or HQS-SMB-CG-BRG@uscg.mil. You may also contact the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Copies may be obtained from the sources indicated in paragraph (c) of this section.
(c) The materials approved for incorporation by reference in this part are:
Federal Highway Administration (FHWA), 1200 New Jersey Avenue SE., Washington, DC 20590 Standard Alphabets for Highways Signs, 1966. (Reprinted April 1984).
[CGD 84-022, 51 FR 16313, May 2, 1986]
Editorial Note:For Federal Register citations affecting § 118.3, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 118.5 Penalty for failure to maintain.
Any person required to maintain lights and other signals upon any bridge or abutment over or in the navigable waters of the United States who fails or refuses to maintain such lights and other signals, or to obey any of the lawful rules and regulations relating to the same is subject to a penalty as provided in 14 U.S.C. 544.
[CGD 75-046, 40 FR 24898, June 11, 1975, as amended by USCG-2020-0304, 85 FR 58279, Sept. 18, 2020]
§ 118.10 Interference or obstruction prohibited.
No person shall obstruct or interfere with any lights or signals maintained in accordance with the regulations prescribed in this part.
§ 118.15 Penalty for interference or obstruction.
Any person violating the provisions of § 118.10 of this chapter shall be deemed guilty of a misdemeanor and be subject to a fine not exceeding $500 for each offense. Each day during which such violation shall continue shall be considered a new offense.
[40 FR 24898, June 11, 1975, as amended by CGD 75-046a, 42 FR 56954, Oct. 31, 1977]
§ 118.20 Obtaining information.
Persons desiring information concerning the marking of bridges shall address their inquiry to the District Commander having jurisdiction over the area concerned, or to the Commandant.
§ 118.25 Application procedure.
Approval of lights and other signals required shall be obtained, prior to construction, from the District Commander of the area in which the structure will be situated. Application shall be by letter accompanied by duplicate sets of drawings showing (a) plan and elevation of the structure showing lights and signals proposed, and (b) small scale vicinity chart showing proposed bridge and all other bridges within 1,000 feet above or below the proposed bridge.
§ 118.30 Action by Coast Guard.
(a) The District Commander receiving the application will review it and approve the lights and other signals proposed, or mark on the drawings, the lights and other signals required, and in the case of lights, cite the applicable section of this chapter which prescribes the lights required for the particular type bridge.
(b) Upon approval, one set of drawings will be returned to the applicant with the notation “navigational lights and/or other signals approved as shown”, date, name and title of the District Commander.
§ 118.40 Modification of requirements.
(a) The District Commander may modify the requirements for the display of lights and other signals on any bridge when a change in local conditions warrants the modification.
(b) The District Commander may exempt bridges over waterways with no significant nighttime navigation from the lighting or other signal requirements in this part.
(c) The District Commander may prescribe special lighting or other signals in specific cases when the lighting or other signals in this part may not provide adequately for the safe passage of vessels.
(d) While a bridge is under construction, the District Commander prescribes the temporary lights and other signals to be displayed for the protection of navigation.
[CGD 84-022, 51 FR 16313, May 2, 1986]
§ 118.45 Lighting for the protection of aerial navigation.
The owner of a bridge which constitutes a hazard to aerial navigation should maintain, in addition to the lights prescribed in this part, such lights as may be prescribed by the Administrator, Federal Aviation Administration.
[40 FR 24898, June 11, 1975, as amended by CGD 75-046a, 42 FR 56954, Oct. 31, 1977]
§ 118.50 Inspection.
Lights and other signals required or authorized under this part are subject to inspection at any time by Coast Guard personnel or authorized agents.
[CGD 84-022, 51 FR 16313, May 2, 1986]
§ 118.55 Periods of operation.
(a) Lights shall be displayed from sunset to sunrise and at other times when the visibility is less than one mile.
(b) Operators shall not be required to exhibit the prescribed lights during seasons when vessels are unable to navigate in the vicinity of the bridge.
(c) The operation of signals other than lights shall be as prescribed by the District Commander. Each case shall be considered individually.
§ 118.60 Characteristics of lights.
All lights required or authorized under this part must be securely attached to the structure and of sufficient candlepower as to be visible against the background lighting at a distance of at least 2,000 yards 90 percent of the nights of the year. Lights must meet the requirements of this part. Lights shall be fixed lights excepting as provided in §§ 118.95. 118.110 and 118.150 of this part. Color specifications are not prescribed for bridge lights, however, the chromaticity standards for navigation lights in 33 CFR Part 84—Annex I are recommended.
[CGD 84-022, 51 FR 16313, May 2, 1986, as amended by USCG-1998-3799, 63 FR 35530, June 30, 1998]
§ 118.65 Lights on fixed bridges.
(a) Each fixed bridge span over a navigable channel shall be lighted so that the center of the navigable channel under each span will be marked by a range of two green lights, and each margin of each navigable channel will be marked by a red light: Provided, That when a margin of a channel is limited by a pier, only those lights prescribed in paragraph (b) of this section shall be required to mark such channel margin. The green lights shall each show through a horizontal arc of 360°; they shall be securely mounted just below the outermost edge of the bridge span structure so as to be visible from an approaching vessel. Each red light shall show through a horizontal arc of 180°, and shall be securely mounted just below the outermost edge of the bridge span structure to show 90° on either side of a line parallel to the axis of the channel so as to be visible from an approaching vessel.
Note:
Until such time that major repairs to or replacements of existing fixed span navigation lights colored green are made, it is permitted that only one of these lights marking the centerline of the same channel under a span shall be visible to an approaching vessel. When major repairs to or replacement of such existing green lights are made they shall conform with this paragraph.
(b) Pier lights. When the navigable channel extends from pier to pier or when piers are located within the navigable channel, each end of such piers shall be lighted with a red light. Each such light shall show through a horizontal arc of 180°, and shall be securely fastened at the end of the pier as low as practicable but not lower than 2 feet above navigable high water to show 90° on either side of a line parallel to the axis of the channel so as to be visible from an approaching vessel.
(c) Main channel. When necessary, the District Commander may prescribe that fixed bridges having two or more spans over a navigable channel shall have the main channel span marked with a set of three white lights arranged in a vertical line directly above each green light on the main channel span. Each white light shall show through a horizontal arc of 180°, and shall be mounted so that 1/2 of the horizontal arc will show on either side of a line parallel to the axis of the channel. These three white lights shall be securely mounted on the bridge structure and spaced as nearly 15 feet apart as the structure of the bridge will permit, with a minimum spacing of 7 feet. The lowest white light in the line of three lights shall be placed not less than 10 nor more than 15 feet above each green light on the main channel span.
Note:
Until such time that major repairs to or replacements of existing main channel lights showing white are made, it is permitted that these lights show through a horizontal arc of not less than 60° nor more than 180° with 1/2 of such arc showing either side of a line parallel to the axis of the main channel. When major repairs or replacement of such existing white lights are made, they shall conform with this paragraph.
[40 FR 24898, June 11, 1975, as amended by CGD 75-046a, 42 FR 56954, Oct. 31, 1977]
§ 118.70 Lights on swing bridges.
(a) Swing span lights on through bridges. Each swing span of every through swing bridge shall be lighted with three lanterns so that when viewed from an approaching vessel the swing span when closed will display three red lights on top of the span structure, one at each end of the span on the same level and one at the center of the span no less than 10 feet above the other two lights, and when open for navigation will display three green lights on top of the span structure in a line parallel to and directly above the long axis of the span, one at each end of the span on the same level, and one at the center of the span no less than 10 feet above the other two lights. Each lantern shall show through alternate red and green horizontal arcs of 60° each, the axis of adjacent arcs to be 90° from each other; each light shall be securely mounted with the axis of the green arcs parallel to the long axis of the swing span.
(b) Swing span lights on deck and half-through bridges. Each swing span of every deck, half-through, girder, or similar type swing bridge shall be lighted with four lanterns so that when viewed from an approaching vessel the swing span when closed will display one red light at each end, and when open to navigation will display two green lights from each end. Each lantern shall show through one red and two green horizontal arcs of 60° each, the axis of each green arc to be 90° from the axis of the red arc; each light shall be securely mounted at the floor level of the span as near to the side of the span as practicable with the axis of the red light normal to the long axis of the swing span and so that the red light will be visible from an approaching vessel when the span is closed.
(c) Pier lights. Every swing bridge shall be lighted so that each end of the piers adjacent to the navigable channel (draw piers) or each end of their protection piers (draw pier protection piers) and each end of the piers protecting the pivot pier (pivot protection pier) will be marked by a red light. Each of these lights shall show through a horizontal arc of 180° and shall be mounted as low as practicable below the floor level of the swing span to show 90° on either side of a line parallel to the axis of the channel so as to be visible from an approaching vessel.
(d) Axis lights. Every swing bridge shall be lighted so that the intersection of the bridge axis with each side of the pivot pier and the channel side of each draw pier which has a protection pier will be marked by a red light: Provided, That if the draw and draw protection piers are straight along their channel faces these lights shall not be required. Each such light shall show through a horizontal arc of 180°, and shall be mounted on the navigable channel face of the pier as low as practicable below the floor level of the swing span to show 90° either side of a line normal to the axis of the navigable channel so as to be visible from an approaching vessel.
(e) Omission of lights. Where the permanent navigable channel passes on only one side of the pivot pier of any swing span, the District Commander may authorize the omission of lighting of the unused channel.
§ 118.75 Lights on single-opening drawbridges.
(a) Bridges in this class. Bridges of the folding, pontoon and similar type single opening drawbridges are included in this class.
(b) Draw span lights. Each draw span of every single opening drawbridge shall be lighted with two lanterns so that when viewed from an approaching vessel the draw span when closed will display two red lights, one at each end of the span and when open to navigation will display two green lights, one at each end of the span. Each lantern shall show alternate red and green horizontal arcs of 60° each, the axis of adjacent arcs to be located 90° from each other; each lantern shall be securely mounted 15 feet above the roadway with the axis of the green arcs parallel to the long axis of the swing span.
(c) Pier or abutment lights. Every swing bridge shall be lighted so that the end of each pier, abutment or fixed portion of the bridge adjacent to the navigable channel through the draw, or each end of the protection piers for such piers, abutments, or fixed portion of the bridge will be marked by a red light. Each red light shall show through an arc of 180°, and shall be securely mounted on the pier, abutment or fixed portion of the bridge as low as practicable to show 90° on either side of a line parallel to the axis of the channel so as to be visible from an approaching vessel.
§ 118.80 Lights on bascule bridges.
(a) Lift span lights. Each lift span of every bascule bridge shall be lighted so that the free end of the span will be marked on each side by a green light which shows only when the span is fully open for the passage of a vessel and by a red light which shows for all other positions of the lift span. Each red and each green light shall show through a horizontal arc of 180°. The lighting apparatus shall be securely mounted to the side of the span so that the light will show equally on either side of a line parallel to the axis of the channels, so that they will be visible from an approaching vessel.
Note:
Until such time that major repairs to or replacement of lift span navigation lights are made, existing lights may show through a horizontal arc of less than 180°. When major repairs to or replacement of existing lights are made they shall conform with this paragraph.
(b) Multiple parallel lift span lights. The outermost side of each outer span of every bascule bridge with parallel multiple lifts shall be lighted as prescribed in paragraph (a) of this section; the lights shall be controlled so that the green lights will be displayed only when all spans are open for navigation. The inner sides of each outer lift span and both sides of each inner lift span of such bascule bridge shall be lighted by red lights for all positions of the lift span. These lights shall have the same arcs of illumination and shall be mounted as described in paragraph (a) of this section.
(c) Pier lights. Every bascule bridge shall be lighted so that each end of every pier, or protection pier where provided, in or adjacent to the navigable channels under the lift span or spans will be marked by a red light. Each such red light shall show through a horizontal arc of 180°, and shall be securely mounted as low as practicable on the end of the pier, or protection pier, to show 90° either side of a line parallel to the axis of the navigable channel so as to be visible from an approaching vessel.
(d) Axis lights. Every bascule bridge which has at least one pier provided with a protection pier shall be lighted so that the intersection of the long axis of the lift span with the channel side of each pier, or protection pier, will be marked by a red light: Provided, That if all such piers and protection piers are straight along their channel faces these lights shall not be required. Each such red light shall show through a horizontal arc of 180° and shall be securely mounted on the navigable channel face of the pier as low as practicable to show 90° on either side of a line normal to the axis of the navigable channel so as to be visible from an approaching vessel.
§ 118.85 Lights on vertical lift bridges.
(a) Lift span lights. The vertical lift span of every vertical lift bridge shall be lighted so that the center of the navigable channel under the span will be marked by a range of two green lights when the vertical lift span is open for navigation, and by one red light on each side for all other positions of the lift span. The green lights shall each show through a horizontal arc of 360°; they shall be securely mounted just below the outermost edge of the bridge span structure so as to be visible from an approaching vessel. Each red light shall show through a horizontal arc of 180°, and shall be securely mounted just below the outermost edge of the lift span to show 90° on either side of the line parallel to the axis of the channel so that only one such light will be visible from an approaching vessel.
Note:
Until such time that major repairs to or replacement of lift span navigation lights are made, it is permitted that these lights show through a horizontal arc of not more than 60°. When major repairs to or replacement of such existing lights are made they shall conform with this paragraph.
(b) Pier lights. Every vertical lift bridge shall be lighted so that each end of every pier in or adjacent to navigable channels under the lift span, or each end of every protection pier when provided, will be marked by a red light. Each such light shall show through a horizontal arc of 180°, and shall be securely mounted as low as practicable on the end of the pier, or the protection pier, to show 90° on either side of a line parallel to the axis of the navigable channel so as to be visible from an approaching vessel.
(c) Axis lights. Every lift bridge which has at least one pier provided with a protection pier shall be lighted so that the intersection of the lift span axis with the channel side of each pier adjacent to the navigable channel will be marked by a red light: Provided, That if every such pier, or protection pier, is straight along its channel face these lights shall not be required. Each such light shall show through a horizontal arc of 180°, and shall be securely mounted on the navigable channel face of the pier as low as practicable to show 90° on either side of a line normal to the axis of the navigable channel so as to be visible from an approaching vessel.
[40 FR 24898, June 11, 1975, as amended by CGD 75-046a, 42 FR 56954, Oct. 31, 1977]
§ 118.90 Bridges crossing channel obliquely.
Bridges crossing a body of water at an angle other than 90° with the axis of the channel shall be lighted in accordance with the regulations in this part with such modifications as are necessary in each particular case.
§ 118.95 Lights on structures not part of a bridge or approach structure.
Lights on sheer booms, isolated piers, obstructions, and other structures not part of a bridge or approach structure must meet the requirements for aids to navigation in Subpart 66.01 of Part 66 of this chapter.
[CGD 84-022, 51 FR 16313, May 2, 1986]
§ 118.100 Retroreflective panels on bridge piers.
The District Commander may require or authorize the display of high intensity red or green retroreflective panels when the District Commander finds it necessary:
(a) To better identify a hazardous pier.
(b) To provide a backup for red pier lights, red channel margin lights, and green mid channel lights, which are subject to vandalism or otherwise difficult to properly maintain. If the District Commander determines that the nominal nighttime visibility required is less than one-half mile, the panels must be at least six inches square. If the visibility required is more than one-half mile, the panels must be at least 12 inches square.
(c) To mark bridge piers or channel sides on bridges not required to have bridge lighting. Lateral significant red triangles and green square retroreflective panels shall be used. The panels shall be at least 36 square inches in area to provide a nominal nighttime visibility distance of at least one-half mile.
[CGD 84-022, 51 FR 16313, May 2, 1986]
§ 118.105 [Reserved]
§ 118.110 Daymarks and lateral lighting on bridges.
(a) The District Commander may require or authorize the marking of the margins of navigation channels through bridges with U.S. aids to navigation system lateral marks and lights installed on the superstructure or on the channel piers. The District Commander may also require or authorize the use of quick flashing, flashing, isophase or occulting red and green lights to mark the main channels.
(b) If lateral system lights are required or authorized to mark the main navigation channels, fixed yellow lights shall be used to mark the adjacent piers and the centerline of the channel shall be marked with the standard lateral system safe water mark and occulting white light, instead of the lights prescribed in § 118.65.
(c) The District Commander may require or authorize the marking of the centerline of the navigation channel drawspan of floating drawbridges with a special mark, diamond in shape, yellow in color, and with a high intensity retroreflective material border. The District Commander may require or authorize the mark to exhibit a flashing yellow light Morse Code “B” characteristic. The mark may not be visible when the drawspan is in the open position.
[CGD 84-022, 51 FR 16313, May 2, 1986]
§ 118.120 Radar reflectors and racons.
The District Commander may require or authorize the installation of radar reflectors and racons on bridge structures, stakes, or buoys. Radar reflectors are used to mark the location of the edge of the navigation channel or bridge channel piers. Racons are used to mark the centerline of the channel. The District Commander may authorize the use of Automatic Identification System Aids to Navigation in lieu of or in addition to a racon.
[CGD 84-022, 51 FR 16313, May 2, 1986, as amended by USCG-2005-21869, 80 FR 5330, Jan. 30, 2015]
§ 118.130 Fog signals.
On waterways where visibility is frequently reduced due to fog or other causes, the District Commander may require or authorize the installation of one or more fog signals to warn the navigator of the presence of the bridge. The fog signals must conform to the installation, range, and sound frequencies provisions in Subpart 67.10 of Part 67 of this chapter. If more than one fog signal is installed on a bridge or in the vicinity, their characteristics must be different to distinguish each signal. The fog signals must be directional to the fullest extent possible to minimize adverse impact on local residents.
[CGD 84-022, 51 FR 16313, May 2, 1986]
§ 118.140 Painting bridge piers.
The District Commander may require painting the sides of bridge channel piers below the superstructure facing traffic white or yellow when they are significantly darkened by weathering or other causes so as to be poorly visible against a dark background.
[CGD 84-022, 51 FR 16314, May 2, 1986]
§ 118.150 Traveller platforms.
The District Commander may require under deck traveller platforms which may significantly reduce the vertical clearance when operated over navigation channels at night to be lighted with quick flashing red lights on each of the four lower corners.
[CGD 84-022, 51 FR 16314, May 2, 1986]
§ 118.160 Vertical clearance gauges.
(a) When necessary for reasons of safety of navigation, the District Commander may require or authorize the installation of clearance gauges. Except as specified in § 117.47(b) of this chapter for certain drawbridges, clearance gauges must meet the requirements of this section.
(b) Clearance gauges must indicate the vertical distance between “low steel” of the bridge channel span (in the closed to navigation position for drawbridges) and the level of the water, measured to the bottom of the foot marks, read from top to bottom. Each gauge must be installed on the end of the right channel pier or pier protection structure facing approaching vessels and extend to a reasonable height above high water so as to be meaningful to the viewer. Other or additional locations may be prescribed by the District Commander if particular conditions or circumstances warrant.
(c) Construction. Each gauge must be permanently fixed to the bridge pier or pier protection structure and made of a durable material of sufficient strength to provide resistance to weather, tide, and current. Gauges may be painted directly on the bridge channel pier or pier protection structure if the surface is suitable and has sufficient width to accommodate the foot marks (graduations) and numerals.
(d) Numerals. (1) Each gauge must be marked by black numerals and foot marks on a white background. Paint, if used, must be of good exterior quality, resistant to excessive chalking or bleeding. Manufactured numerals and background material may be used.
(2) The size, type, and spacing of numerals must conform to the Standard Alphabets for Highway Signs and the following table. The nominal day visibility distance is the distance at which the clearance information needs to be ascertained by approaching vessel operators. The District Commander determines this distance for each bridge.
Nominal day visibility distance (feet) | Height of numeral (inches) | Type of numeral | Vertical spacing of numerals (feet)
Less than 500 | 12 | Series C | 2
500 to 750 | 18 | Series C | 2
750 to 1,000 | 24 | Series D | 5
1,000 to 2,000 | 30 | Series E | 5
More than 2,000 | 36 | Series E | 10
(3) The length of the foot marks must be no less than the width of a single numeral used (except numerals 1 and 4), be the same thickness as the width of stroke of the numeral, and extend to the nearest margin of the white background. Foot marks must be spaced every foot for nominal day visibility of less than 500 feet, every two feet for a nominal day visibility of more than 500 feet but less than 1,000 feet, and every five feet for nominal day visibility of more than 1,000 feet.
(4) Intermediate foot marks may be used when more precise determination of actual clearance is necessary. Such intermediate foot marks must have a width of stroke one-half the width of the stroke required for the numeral and shall be three-quarters as long as the primary foot marks.
(5) The horizontal distance between the numeral and nearest edge of the white background shall be no less than one-half the width of a single numeral (excepting numerals 1 and 4).
(6) The minimum width of the white background shall be no less than three times the width of a single numeral (excepting numerals 1 and 4) plus the widths of each additional numeral (when multiple numerals are used plus numeral spacing).
(e) Maintenance. The owner or operator of the bridge shall maintain each gauge in good repair and legible condition. The bridge owner or operator is responsible for the accuracy of the gauge and shall remeasure the vertical distance of the numerals and foot marks below “low steel” of the bridge whenever the gauge is repainted or the structure is repaired.
[CGD 84-022, 51 FR 16314, May 2, 1986, as amended by USCG-2012-0306, 77 FR 37315, June 21, 2012]
SUBCHAPTER K SECURITY OF VESSELS
120-124 PARTS 120-124 [RESERVED]
CHAPTER I COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED)
SUBCHAPTER L WATERFRONT FACILITIES
PART 125 IDENTIFICATION CREDENTIALS FOR PERSONS REQUIRING ACCESS TO WATERFRONT FACILITIES OR VESSELS
Authority: R.S. 4517, 4518, secs. 19, 2, 23 Stat. 58, 118, sec. 7, 49 Stat. 1936, sec. 1, 40 Stat. 220; 46 U.S.C. 570-572, 2, 689, 70051 and 70105; E.O. 10173, E.O. 10277, E.O. 10352, 3 CFR, 1949-1953 Comp. pp. 356, 778, 873.
Source: CGFR 56-15, 21 FR 2940, May 3, 1956, unless otherwise noted.
§ 125.01 Commandant.
The term Commandant means Commandant of the Coast Guard.
§ 125.03 District Commander.
The term District Commander means the officer of the Coast Guard designated by the Commandant to command a Coast Guard District.
§ 125.05 Captain of the Port.
The term Captain of the Port means the officer of the Coast Guard, under the command of a District Commander, so designated by the Commandant for the purpose of giving immediate direction to Coast Guard law enforcement activities within the general proximity of the port in which he is situated.
§ 125.06 Western rivers.
The term western rivers as used in the regulations in this subchapter shall include only the Red River of the North, the Mississippi River and its tributaries above the Huey P. Long Bridge, and that part of the Atchafalaya River above its junction with the Plaquemine-Morgan City alternate waterway.
[CGFR 57-52, 22 FR 10301, Dec. 20, 1957]
§ 125.07 Waterfront facility.
The term waterfront facility as used in this subchapter, means all piers, wharves, docks, and similar structures to which vessels may be secured, buildings on such structures or contiguous to them, and equipment and materials on such structures or in such buildings.
§ 125.08 Great Lakes.
The term Great Lakes as used in the regulations in this subchapter shall include the Great Lakes and their connecting and tributary waters.
[CGFR 57-52, 22 FR 10301, Dec. 20, 1957]
§ 125.09 Identification credentials.
The term Identification credentials as used in this subchapter, means any of the following:
(a) Coast Guard Port Security Card (Form CG 2514).
(b) Merchant Mariner's Document.
(c) Armed Forces Identification Card.
(d) Identification credentials issued by Federal Law enforcement and intelligence agencies to their officers and employees (e. g., Department of the Treasury, Department of Justice, Federal Communications Commission).
(e) Identification credentials issued to public safety officials (e. g., police, firemen) when acting within the scope of their employment.
(f) Transportation Worker Identification Credential.
(g) Such other identification as may be approved by the Commandant from time to time.
[CGD 56-15, 21 FR 2940, May 3, 1956, as amended by CGD 77-228, 43 FR 53427, Nov. 16, 1978; CG-2006-24196, 72 FR 3587, Jan. 25, 2007]
§ 125.11 Form of Coast Guard Port Security Card.
The Coast Guard Port Security Card issued by the Coast Guard under the provisions of this subchapter shall be a laminated card bearing photograph, signature, fingerprint, and personal description of the holder, and other pertinent data.
§ 125.12 Period of validity of Coast Guard Port Security Cards.
(a) The Coast Guard Port Security Card (Form CG-2514) shall be valid for a period of eight years from the date of issuance thereof unless sooner suspended or revoked by proper authority. On the first day after eight years from the date of issuance, the Coast Guard Port Security Card (Form CG-2514) is hereby declared invalid and shall be considered null and void for all purposes.
(b) The holder of a Coast Guard Port Security Card, which is about to expire or has expired, may apply for a new Coast Guard Port Security Card in accordance with the procedures set forth in § 125.21. In the event the applicant's Coast Guard Port Security Card has expired, such card shall accompany the application for a new Coast Guard Port Security Card. In the event the applicant is holding a valid Coast Guard Port Security Card at the time he submits his application for a new card, such person shall surrender the old or expired Coast Guard Port Security Card at the time he is issued a new Coast Guard Port Security Card. In the event the old Coast Guard Port Security Card was lost, stolen, or destroyed, then the applicant shall comply with the provisions in § 125.51, regarding the replacement of a lost Coast Guard Port Security Card and the new card issued as a replacement for a lost card which has expired or is about to expire shall bear a current issuance date.
[CGFR 58-52, 23 FR 9751, Dec. 18, 1958]
§ 125.13 Captain of the Port Identification Cards.
Captain of the Port Identification Cards issued under the form designation “Form CG 2514” prior to the revision of August 1950 were declared invalid by a notice published in the Federal Register on September 11, 1946 (11 FR 10103), which declaration is hereby reaffirmed.
§ 125.15 Access to waterfront facilities, and port and harbor areas, including vessels and harbor craft therein.
(a) The Commandant will, from time to time, direct Captains of the Port of certain ports to prevent access of persons who do not possess one or more of the identification credentials listed in § 125.09 to those waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, where the following shipping activities are conducted:
(1) Those vital to the Military Defense Assistance Program.
(2) Those pertaining to the support of U.S. military operations.
(3) Those pertaining to loading and unloading explosives and other dangerous cargo.
(4) Those essential to the interests of national security and defense, to prevent loss, damage or injury, or to insure the observance of rights and obligations of the United States.
(b) No person who does not possess one of the identification credentials aforesaid shall enter or remain in such facilities, or port or harbor areas, including vessels and harbor craft therein.
(c) The Captain of the Port shall give local public notice of the restriction of access to waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, as far in advance as practicable, and shall cause such facilities and areas to be suitably marked as to such restriction.
[CGFR 56-15, 21 FR 2940, May 3, 1956, as amended by CGFR 58-43, 23 FR 8542, Nov. 1, 1958]
§ 125.17 Persons eligible for Coast Guard Port Security Cards.
(a) Only the following persons may be issued Coast Guard Port Security Cards:
(1) Persons regularly employed on vessels or on waterfront facilities.
(2) Persons having regular public or private business connected with the operation, maintenance, or administration of vessels, their cargoes, or waterfront facilities.
(b) A holder of a Merchant Mariner's Document shall not be issued a Port Security Card, unless his Merchant Mariner's Document is surrendered to the Coast Guard. In this connection, see § 125.09.
[CGFR 62-39, 27 FR 11259, Nov. 15, 1962, as amended by CGD 77-228, 43 FR 53427, Nov. 16, 1978]
§ 125.19 Standards.
Information concerning an applicant for a Coast Guard Port Security Card, or a holder of such card, which may preclude a determination that his character and habits of life are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, shall relate to the following:
(a) Advocacy of the overthrow or alteration of the Government of the United States by unconstitutional means.
(b) Commission of, or attempts or preparations to commit, an act of espionage, sabotage, sedition or treason, or conspiring with, or aiding or abetting another to commit such an act.
(c) Performing, or attempting to perform, duties or otherwise acting so as to serve the interests of another government to the detriment of the United States.
(d) Deliberate unauthorized disclosure of classified defense information.
(e) [Reserved]
(f) Having been adjudged insane, having been legally committed to an insane asylum, or treated for serious mental or neurological disorder, without evidence of cure.
(g) Having been convicted of any of the following offenses, indicative of a criminal tendency potentially dangerous to the security of such waterfront facilities and port and harbor areas, including vessels and harbor craft therein; arson, unlawful trafficking in drugs, espionage, sabotage, or treason.
(h) Drunkenness on the job or addiction to the use of narcotic drugs, without adequate evidence of rehabilitation.
(i) Illegal presence in the United States, its territories or possessions; having been found finally subject to deportation order by the United States Immigration and Naturalization Service.
[CGFR 56-15, 21 FR 2940, May 3, 1956, as amended by 37 FR 23422, Nov. 3, 1972]
§ 125.21 Applications.
(a)(1) Application for a Coast Guard Port Security Card shall be made under oath in writing and shall include applicant's answers in full to inquiries with respect to such matters as are deemed by the Commandant to be pertinent to the standards set forth in § 125.19, and to be necessary for a determination whether the character and habits of life of the applicant are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States.
(2) The application also shall include applicant's complete identification, citizenship record, personal description, military record, if any, and a statement of the applicant's sponsor certifying the applicant's employment or union membership and that applicant's statements are true and correct to the best of sponsor's knowledge.
(3) The application shall be accompanied by two unmounted, dull finish photographs, 1 inch × 1 15/16 inches, of passport type, taken within one year of the date of application. The photograph shall show the full face with the head uncovered and shall be a clear and satisfactory likeness of the applicant. It shall portray the largest image of the head and upper shoulders possible within the dimensions specified.
(4) Fingerprint records on each applicant shall be taken by the Coast Guard at the time application is submitted.
(5) The applicant shall present satisfactory proof of his citizenship.
(6) The applicant shall indicate the address to which his Coast Guard Port Security Card can be delivered to him by mail. Under special circumstances the applicant may arrange to call in person for the Coast Guard Port Security Card.
(7) The applicant shall present his application, in person, to a Coast Guard Port Security Unit designated to receive such applications. Such units will be located in or near each port where Coast Guard Port Security Cards are required. Each Captain of the Port shall forward promptly to the Commandant each application for a Coast Guard Port Security Card received by him.
(b) If an applicant fails or refuses to furnish the required information or to make full and complete answer with respect to all matters of inquiry, the Commandant shall hold in abeyance further consideration of the application, and shall notify the applicant that further action will not be taken unless and until the applicant furnishes the required information and fully and completely answers all inquiries directed to him.
[CGFR 59-63, 25 FR 1589, Feb. 24, 1960]
§ 125.23 United States citizens.
Acceptable evidence of United States citizenship is described in this section in the order of its desirability; however, the Coast Guard will reject any evidence not believed to be authentic;
(a) Birth certificate or certified copy thereof.
(b) Certificate of naturalization. This shall be presented by all persons claiming citizenship through naturalization.
(c) Baptismal certificate or parish record recorded within one year after birth.
(d) Statement of a practicing physician certifying that he attended the birth and that he has a record in his possession showing the date and place of birth.
(e) United States passport.
(f) A commission in one of the armed forces of the United States, either regular or reserve; or satisfactory documentary evidence of having been commissioned in one of the armed forces subsequent to January 1, 1936, provided such commission or evidence shows the holder to be a citizen.
(g) A continuous discharge book, or Merchant Mariner's Document issued by the Coast Guard which shows the holder to be a citizen of the United States.
(h) If an applicant claiming to be a citizen of the United States submits a delayed certificate of birth issued under a State's seal, it may be accepted as prima facie evidence of citizenship if no one of the requirements in paragraphs (a) through (g) of this section can be met by the applicant and in the absence of any collateral facts indicating fraud in its procurement.
(i) If no one of the requirements in paragraphs (a) through (h) of this section can be met by the applicant, he should make a statement to that effect, and in an attempt to establish citizenship, he may submit for consideration data of the following character:
(1) Report of the Census Bureau showing the earliest record of age or birth available. Request for such information should be addressed to the Director of the Census, Suitland, Md. 20233. In making such request, definite information must be furnished the Census Bureau as to the place of residence when the first census was taken after the birth of the applicant, giving the name of the street and the number of the house, or other identification of place where living, etc.; also names of parents or the names of other persons with whom residing on the date specified.
(2) School records, immigration records, or insurance policies (the latter must be at least 10 years old).
§ 125.25 Aliens.
Alien registration records together with other papers and documents which indicated the country of which the applicant is a citizen shall be accepted as evidence of citizenship in a foreign nation.
§ 125.27 Sponsorship of applicant.
Applications for a Coast Guard Port Security Card shall not be accepted unless sponsored. The applicant shall be sponsored by an authorized official of applicant's employer or by an authorized official of applicant's labor union. Each company and each labor union concerned shall file with the appropriate Captain of the Port a list of officials of the company or union who are authorized to sponsor applicants. Other sponsorship may be accepted where the circumstances warrant.
§ 125.29 Insufficient information.
(a)(1) If, in the judgment of the Commandant, an application does not contain sufficient information to enable him to satisfy himself that the character and habits of life of the applicant are such to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft herein, would not be inimical to the security of the United States, the Commandant may require the applicant to furnish, under oath in writing or orally, such further information as he deems pertinent to the standards set forth in § 125.19 and necessary to enable him to make such a determination.
(2) If an applicant fails or refuses to furnish such additional information, the Commandant shall hold in abeyance further consideration of the application, and shall notify the applicant that further action will not be taken unless and until the applicant furnishes such information.
(b) Upon receipt, the application and such further information as the Commandant may have required shall be referred, except in those instances where action on an application is held in abeyance pursuant to § 125.21(b) or to paragraph (a)(2) of this section, to a committee composed of a representative of the Legal Division, of the Merchant Vessel Personnel Division and of the Intelligence Division, Coast Guard Headquarters. The committee shall prepare an analysis of the available information and shall make recommendations for action by the Commandant.
[CGFR 59-63, 25 FR 1589, Feb. 24, 1960]
§ 125.31 Approval of applicant by Commandant.
(a) If the Commandant is satisfied that the character and habits of life of the applicant are not such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would be inimical to the security of the United States, he will direct that a Coast Guard Port Security Card be issued to the applicant.
(b) If the Commandant is not satisfied that the character and habits of life of the applicant are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he will notify the applicant in writing as provided for in § 125.35.
§ 125.33 Holders of Coast Guard Port Security Cards.
(a) Whenever the Commandant is not satisfied that the character and habits of life of a holder of a Coast Guard Port Security Card are such as to warrant the belief that his presence on waterfront facilities and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he will request the holder to furnish, under oath in writing, such information as he deems pertinent and necessary for a determination on this issue.
(b) If the holder fails or refuses to furnish such information within thirty (30) days after receipt of the Commandant's request, the Commandant may issue the written notice provided for in § 125.35(a).
(c) The holder's failure or refusal to furnish such information shall preclude a determination that the holder's character and habits of life are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States.
(d) Upon receipt of such information as the Commandant may have required, the procedure prescribed in § 125.29(b) shall be followed.
(e) If the Commandant is satisfied that the character and habits of life of the holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he shall notify the holder accordingly.
(f) If the Commandant is not satisfied that the character and habits of life of the holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he shall notify the holder in writing as provided for in § 125.35.
[CGFR 59-63, 25 FR 1589, Feb. 24, 1960]
§ 125.35 Notice by Commandant.
(a) The notice provided for in §§ 125.31 and 125.33 shall contain a statement of the reasons why the Commandant is not satisfied that the character and habits of life of the applicant or holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States. Such notice shall be as specific and detailed as the interests of national security shall permit and shall include pertinent information such as names, dates, and places in such detail as to permit reasonable answer.
(b) The applicant or holder shall have 20 days from the date of receipt of the notice of reasons to file written answer thereto. Such answer may include statements or affidavits by third parties or such other documents or evidence as the applicant or holder deems pertinent to the matters in question.
(c) Upon receipt of such answer the procedure prescribed in § 125.29(b) shall be followed.
(d) If the Commandant is satisfied that the character and habits of life of the applicant or holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he shall, in the case of an applicant, direct that a Coast Guard Port Security Card be issued to the applicant, or, in the case of a holder, notify him accordingly.
(e) If the Commandant is not satisfied that the applicant's or holder's character and habits of life are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, the Commandant shall refer the matter to a Hearing Board for hearing and recommendation in accordance with the provisions of this part.
§ 125.37 Hearing Boards.
The Commandant may establish a Hearing Board in each Coast Guard District. The Commandant shall designate for each Hearing Board a Chairman, who shall be, so far as practicable, an officer of the Coast Guard. The Commandant shall designate, so far as practicable, a second member from a panel of persons representing labor named by the Secretary of Labor, and a third member from a panel of persons representing management named by the Secretary of Labor.
§ 125.39 Notice by Hearing Board.
Whenever the Commandant refers a matter to a Hearing Board, the Chairman shall:
(a) Fix the time and place of the hearing;
(b) Inform the applicant or holder of the names of the members of the Hearing Board, their occupations, and the businesses or organizations with which they are affiliated, of his privilege of challenge, and of the time and place of the hearing;
(c) Inform the applicant or holder of his privilege to appear before the Hearing Board in person or by counsel or representative of his choice, and to present testimonial and documentary evidence in his behalf, and to cross-examine any witnesses appearing before the Board; and
(d) Inform the applicant or holder that if within 10 days after receipt of the notice he does not request an opportunity to appear before the Hearing Board, either in person or by counsel or representative, the Hearing Board will proceed without further notice to him.
§ 125.41 Challenges.
Within five days after receipt of the notice described in § 125.39 the applicant or holder may request disqualification of any member of the Hearing Board on the grounds of personal bias or other cause. The request shall be accompanied by an affidavit setting forth in detail the facts alleged to constitute grounds for disqualification. The affidavit may be supplemented by an oral presentation if desired. If after due consideration the Chairman believes a challenged member is qualified notwithstanding the challenge, he shall notify the person who made the challenge and arrange to proceed with the hearing. If the person who made the challenge takes exception to the ruling of the Chairman, the exception and data relating to the claim of disqualification shall be made a matter of record. If the Chairman finds that there is reasonable ground for disqualification he shall furnish the person who made the challenge with the name of an alternate in lieu of the challenged member and arrange to proceed with the hearing. In the event the Chairman is challenged, he shall forthwith notify the Commandant, furnishing the grounds for the claim of disqualification, and the Commandant shall act upon the challenge in accordance with the foregoing procedure. In addition to the right to challenge for cause, a person who has requested a hearing shall have two peremptory challenges, one challenge for the management member and one challenge for the labor member of the Hearing Board. Should the management member be so challenged, the person who made the challenge may elect to have the management member replaced by another management member or by a member not representing either management or labor; if the member peremptorily challenged represents labor, the person who made the challenge may elect to have the labor member replaced by another labor member or by a member not representing either management or labor.
§ 125.43 Hearing procedure.
(a) Hearings shall be conducted in an orderly manner and in a serious, businesslike atmosphere of dignity and decorum and shall be expedited as much as possible.
(b) The hearing shall be in open or closed session at the option of the applicant or holder.
(c) Testimony before the Hearing Board shall be given under oath or affirmation.
(d) The Chairman of the Hearing Board shall inform the applicant or holder of his right to:
(1) Participate in the hearing;
(2) Be represented by counsel of his choice;
(3) Present witnesses and offer other evidence in his own behalf and in refutation of the reasons set forth in the Notice of the Commandant; and
(4) Cross-examine any witnesses offered in support of such reasons.
(e) Hearings shall be opened by the reading of the Notice of the Commandant and the answer thereto. Any statement and affidavits filed by the applicant or holder may be incorporated in the record by reference.
(f) The Hearing Board may, in its discretion, invite any person to appear at the hearing and testify. However, the Board shall not be bound by the testimony of such witness by reason of having called him and shall have full right to cross-examine the witness. Every effort shall be made to produce material witnesses to testify in support of the reasons set forth in the Notice of the Commandant, in order that such witnesses may be confronted and cross-examined by the applicant or holder.
(g) The applicant or holder may introduce such evidence as may be relevant and pertinent. Rules of evidence shall not be binding on the Hearing Board, but reasonable restrictions may be imposed as to the relevancy, competency and materiality of matters considered. If the applicant or holder is, or may be, handicapped by the non-disclosure to him of confidential sources, or by the failure of witnesses to appear, the Hearing Board shall take the fact into consideration.
(h) The applicant or holder or his counsel or representative shall have the right to control the sequence of witnesses called by him.
(i) The Hearing Board shall give due consideration to documentary evidence developed by investigation, including membership cards, petitions bearing the applicant's or holder's signature, books, treatises or articles written by the applicant or holder and testimony by the applicant or holder before duly constituted authority.
(j) Complete verbatim stenographic transcription shall be made of the hearing by qualified reporters and the transcript shall constitute a permanent part of the record. Upon request, the applicant or holder or his counsel or representative shall be furnished, without cost, a copy of the transcript of the hearing.
(k) The Board shall reach its conclusion and base its determination on information presented at the hearing, together with such other information as may have been developed through investigation and inquiries or made available by the applicant or holder.
(l) If the applicant or holder fails, without good cause shown to the satisfaction of the chairman, to appear personally or to be represented before the Hearing Board, the Board shall proceed with consideration of the matter.
(m) The recommendation of the Hearing Board shall be in writing and shall be signed by all members of the Board. The Board shall forward to the Commandant, with its recommendation, a memorandum of reasons in support thereof. Should any member be in disagreement with the majority a dissent should be noted setting forth the reasons therefor. The recommendation of the Board, together with the complete record of the case, shall be sent to the Commandant as expeditiously as possible.
§ 125.45 Action by Commandant.
(a) If, upon receipt of the Board's recommendation, the Commandant is satisfied that the character and habits of life of the applicant or holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he shall, in the case of an applicant, direct that a Coast Guard Port Security Card be issued to the applicant, or, in the case of a holder, notify him accordingly.
(b) If, upon receipt of the Board's recommendation, the Commandant is not satisfied that the character and habits of life of the applicant or holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, the Commandant shall:
(1) In the case of an applicant, notify him that a Coast Guard Port Security Card will not be issued to the applicant, or,
(2) In the case of a holder, revoke and require the surrender of his Coast Guard Port Security Card.
(c) Such applicant or holder shall be notified of his right, and shall have 20 days from the receipt of such notice within which, to appeal under this part.
§ 125.47 Appeals.
(a) The Commandant shall establish at Coast Guard Headquarters, Washington, DC, an Appeal Board to hear appeals provided for in this part. The Commandant shall designate for the Appeal Board a Chairman, who shall be so far as practicable, an officer of the Coast Guard. The Commandant shall designate, so far as practicable, a member from a panel of persons representing management nominated by the Secretary of Labor, and a member from a panel of persons representing labor nominated by the Secretary of Labor. The Commandant shall insure that persons designated as Appeal Board members have suitable security clearance. The Chairman of the Appeal Board shall make all arrangements incident to the business of the Appeal Board.
(b) If an applicant or holder appeals to the Appeal Board within 20 days after receipt of notice of his right to appeal under this part, his appeal shall be handled under the same procedure as that specified in § 125.39, and the privilege of challenge may be exercised through the same procedure as that specified in § 125.41.
(c) Appeal Board proceedings shall be conducted in the same manner as that specified in § 125.43.
§ 125.49 Action by Commandant after appeal.
(a) If, upon receipt of the Appeal Board's recommendation, the Commandant is satisfied that the character and habits of life of the applicant or holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, he shall, in the case of an applicant, direct that a Coast Guard Port Security Card be issued to the applicant, or in the case of a holder, notify him accordingly.
(b) If, upon receipt of the Appeal Board's recommendation, the Commandant is not satisfied that the character and habits of life of the applicant or holder are such as to warrant the belief that his presence on waterfront facilities, and port and harbor areas, including vessels and harbor craft therein, would not be inimical to the security of the United States, the Commandant shall notify the applicant or holder that his appeal is denied.
§ 125.51 Replacement of lost Coast Guard Port Security Card.
(a) Any person whose Coast Guard Port Security Card has been stolen, lost, or destroyed shall report that fact to a Coast Guard Port Security Unit or Captain of the Port as soon thereafter as possible.
(b) A person who has lost a Coast Guard Port Security Card may apply for a replacement card by submitting “An Application for Replacement of Lost Port Security Card” (Form CG 2685A) to a Coast Guard Port Security Unit. A replacement will be issued only after a full explanation of the loss of the Coast Guard Port Security Card is made in writing to the Coast Guard and after a full check is made and authorization is granted by the Commandant.
(c) Any person to whom a Coast Guard Port Security Card has been issued as a replacement for a lost card, shall immediately surrender the original card to the nearest Coast Guard Port Security Unit or Captain of the Port if the original card should be recovered.
§ 125.53 Requirements for credentials; certain vessels operating on navigable waters of the United States (including the Great Lakes and Western Rivers).
(a) Every person desiring access to vessels, except public vessels, falling within any of the categories listed below, as a master, person in charge, or member of the crew thereof, shall be required to be in possession of one of the identification credentials listed in § 125.09.
(1) Towing vessels, barges, and lighters operating in the navigable waters of the continental United States other than the Great Lakes and Western Rivers.
(2) Harbor craft, such as water taxis, junk boats, garbage disposal boats, bum boats, supply boats, repair boats, and ship cleaning boats, which in the course of their normal operations service or contact vessels, foreign or domestic, public or merchant, in the navigable waters of the continental United States other than the Great Lakes and Western Rivers.
(b) The term “master, person in charge, or member of the crew” shall be deemed to include any person who serves on board in any capacity concerned with the operation, maintenance, or administration of the vessel or its cargo.
(c) Where the Coast Guard Port Security Card (Form CG 2514) is to be used as the identification required by paragraph (a) of this section, application for such card may be made immediately by the persons concerned. The issuance of the Coast Guard Port Security Card shall be in the form and manner prescribed by § 125.11.
(d) At the discretion of the District Commander any person desiring access to vessels of the categories named in this section, who may be required by the provisions hereof to possess identification credentials, may be furnished a letter signed by the District Commander or the Captain of the Port and this letter shall serve in lieu of a Coast Guard Port Security Card and will authorize such access for a period not to exceed 60 days, and such a letter issued shall be deemed to be satisfactory identification within the meaning of § 125.09. The issuance of the letter shall be subject to the following conditions:
(1) The services of the person are necessary to avoid delay in the operation of the vessel;
(2) The person does not possess one of the identification credentials listed in § 125.09.
(3) The person has filed his application for a Coast Guard Port Security Card or submits his application before the letter is issued; and,
(4) The person has been screened by the District Commander or Captain of the Port and such officer is satisfied concerning the eligibility of the applicant to receive a temporary letter.
[CGFR 56-15, 21 FR 2940, May 3, 1956, as amended by CGFR 58-51, 21 FR 9339, Nov. 30, 1956]
§ 125.55 Outstanding Port Security Card Applications.
A person who has filed an application for a Coast Guard Port Security Card and who did not receive such a document prior to May 1, 1956, shall submit a new application in accordance with the requirements of this part.
[CGFR 61-54, 26 FR 11862, Dec. 12, 1961]
§ 125.57 Applications previously denied.
A person who has been denied a Coast Guard Port Security Card before May 1, 1956, may file a new application for such a document in accordance with the requirements of this part.
PART 126 HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES
Authority: 46 U.S.C. 70034; 49 CFR 1.46.
§ 126.1 What does this part apply to?
This part applies to waterfront facilities handling packaged and bulk-solid dangerous cargo and to vessels at those facilities.
[USCG-1998-4302, 68 FR 55440, Sept. 26, 2003]
§ 126.3 Definitions.
As used in this part—
Break-bulk means packages that are handled individually, palletized, or unitized for purposes of transportation, as opposed to materials in bulk and containerized freight.
Bulk means without mark or count and directly loaded or unloaded to or from a hold or tank on a vessel without the use of containers or break-bulk packaging.
Captain of the port or COTP means the officer of the Coast Guard, under the command of a District Commander, is designated by the Commandant for the purpose of giving immediate direction to Coast Guard law enforcement activities within an assigned area.
Cargo of particular hazard means any of the following:
(1) Division 1.1 and 1.2 explosives, as defined in 49 CFR 173.50, for which a permit is required under 33 CFR 126.17.
(2) Ammonium nitrate products, division 5.1 (oxidizing) materials listed in 49 CFR 176.410, for which a permit is required under 49 CFR 176.415.
(3) Division 4.3 dangerous when wet products as defined in 49 CFR 173.124, in excess of 60 mt.
(4) Division 2.3 and 6.1 poison inhalation hazard products as defined in 49 CFR 173.115 and 173.132, respectively.
(5) Class 7 highway route controlled quantity radioactive material or fissile material, controlled shipment, as defined in 49 CFR 173.403.
Commandant means the Commandant of the United States Coast Guard.
Container means a reusable container that has a volume of 1.81 cubic meters (64 cubic feet) or more, is designed and constructed to permit being lifted with its contents intact, and is intended primarily for containment of packages (in unit form) during transportation.
Dangerous cargo means all hazardous materials listed in 49 CFR parts 170 through 179, except those materials preceded by an “A” in the Hazardous Materials Table in 49 CFR 172.101, and all cargo listed in 46 CFR part 148.
Designated dangerous cargo means Division 1.1 and 1.2 explosives as defined in 49 CFR 173.50.
Designated waterfront facility means a waterfront facility designated under § 126.13 for the handling, storing, loading, and discharging of any hazardous material(s) subject to the Dangerous Cargoes Regulations (49 CFR parts 170 through 179), except for those materials preceded by an “A” in the Hazardous Materials Table in 49 CFR 172.101 and for those materials carried as bulk liquids.
Facility of particular hazard means a designated waterfront facility that is authorized to handle a cargo of particular hazard.
Facility operator means the person or company who owns, operates, or is responsible for the operation of a waterfront facility.
Net tons means net weight in tons.
Net weight, in reference to material in a package, tank, or container, means the weight of the contents of a package, tank, or container and does not include the weight of any packaging material or containing devices.
Transport unit means a transport vehicle or a container.
Waterfront facility means all piers, wharves, and similar structures to which a vessel may be secured; areas of land, water, or land and water under and in the immediate proximity to these structures; buildings on or contiguous to these structures; and the equipment and materials on or in these structures or buildings. The term does not include facilities directly operated by the Department of Defense.
[USCG-1998-4302, 68 FR 55440, Sept. 26, 2003, as amended by USCG-2008-0179, 73 FR 35013, June 19, 2008]
§ 126.5 Incorporation by reference: Where can I get a copy of the publications mentioned in this part?
(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in paragraph (b) of this section, we must publish a notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the Coast Guard Headquarters. Contact Commandant (CG-OES), Attn: Office of Operating and Environmental Standards, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509. You may also contact the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. All approved material is available from the sources indicated in paragraph (b) of this section.
(b) The materials approved for incorporation by reference in this part, and the sections affected, are as follows:
ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959, 877-909-2786, http://www.astm.org.
ASTM F1121-87 (Reapproved 2010), Standard Specification for International Shore Connections for Marine Fire Applications, (approved March 1, 2010) | 126.15
National Fire Protection Association (NFPA), One Batterymarch Park, P.O. Box 9101, Quincy, MA 02269-9101:
NFPA 10, Standard for Portable Fire Extinguishers, 1998 Edition | 126.15
NFPA 13, Standard for the Installation of Sprinkler Systems, 1996 Edition | 126.15
NFPA 14, Standard for the Installation of Standpipe and Hose Systems, 1996 Edition | 126.15
NFPA 30, Flammable and Combustible Liquids Code, 1996 | 126.15
NFPA 51B, Standard for Fire Prevention in Use of Cutting and Welding Processes, 1994 Edition | 126.30
NFPA 70, National Electrical Code, 1996 | 126.15
NFPA 307, Standard for the Construction and Fire Protection of Marine Terminals, Piers, and Wharves, 1995 Edition | 126.15
[USCG-1998-4302, 68 FR 55441, Sept. 26, 2003, as amended at 69 FR 18803, Apr. 9, 2004; USCG-2010-0351, 75 FR 36283, June 25, 2010; USCG-2012-0866, 78 FR 13248, Feb. 27, 2013; USCG-2014-0410, 79 FR 38434, July 7, 2014]
§ 126.11 Waiver authority based on local or unusual conditions.
Whenever the Commandant, the District Commander, or the Captain of the Port finds that the application of any provisions contained in §§ 126.15 and 126.16 is not necessary to the safety or security of the port and vessels and waterfront facilities therein, or that its application is not practical because of local conditions or because the materials or personnel required for compliance are not available, or because the requirements of the national defense justify a departure from such provision, the Commandant, the District Commander, or the Captain of the Port may waive compliance with such provision, to the extent and under such requirements as they determine.
[CGD 78-023, 44 FR 4643, Jan. 22, 1979]
§ 126.12 How do I request the use of an alternative method of complying with a requirement in this part?
(a) An owner or operator of a waterfront facility may request that the COTP allow the use of an alternative method of complying with a requirement in this part.
(b) The request must establish, to the COTP's satisfaction—
(1) That compliance with the requirement is economically or physically impractical; and
(2) That the alternative requested provides an equivalent or greater level of safety.
(c) The COTP examines the request and provides an answer, in writing, within 30 days of receipt of the request.
[USCG-1998-4302, 68 FR 55441, Sept. 26, 2003]
§ 126.13 Designation of waterfront facilities.
(a) Waterfront facilities which fulfill the conditions required in § 126.15, unless waived under provisions of § 126.11, and only such waterfront facilities are designated for the handling, storing, stowing, loading, discharging, or transporting of dangerous cargo, subject to compliance with other applicable requirements and provisions set forth in this part.
(b) Handling, storing, stowing, loading, discharging, or transporting dangerous cargo at any waterfront facility other than one designated by this section is hereby prohibited, and violation of this prohibition will subject the violator to the civil or criminal penalties provided in 46 U.S.C. 70036.
[CGFR 57-52, 22 FR 10302, Dec. 20, 1957, as amended by CGD 78-023, 44 FR 4643, Jan. 22, 1979; USCG-2020-0304, 85 FR 58279, Sept. 18, 2020]
§ 126.15 What conditions must a designated waterfront facility meet?
(a) All designated waterfront facilities must meet the following:
(1) Fire extinguishing equipment. Fire extinguishing equipment, such as automatic sprinklers, hydrants, hose connections, and firefighting water supplies must be available and maintained in adequate quantities and locations. Fire extinguishing equipment must meet State and local laws. In the absence of applicable State and local laws, fire extinguishing equipment must meet NFPA 10, 13, 14, and 307. (Incorporated by reference, see § 126.5.)
(2) Fire appliances. The location of all fire appliances, such as hydrants, standpipes, hose stations, fire extinguishers, and fire alarm boxes must be conspicuously marked and readily accessible according to NFPA 10, 13, 14, and 307.
(3) Warning signs. Warning signs must be constructed and installed according to NFPA 307, chapter 7-8.7.
(4) Lighting. If the facility transfers dangerous cargo between sunset and sunrise, it must have outdoor lighting that adequately illuminates the transfer work area. The lighting must be installed and maintained according to NFPA 70 (Incorporated by reference, see § 126.5.) and must be located or shielded so that it cannot be mistaken for an aid to navigation and does not interfere with navigation on waterways.
(5) International shore connection. If the facility conducts cargo operations involving foreign-flag vessels, the facility must have an international shore connection meeting ASTM F-1121. (Incorporated by reference, see § 126.5.)
(6) Access to the facility. Whenever dangerous cargo is transferred or stored on the facility, access to the facility must be limited to—
(i) Personnel working on the facility or vessel;
(ii) Delivery and service personnel authorized to conduct their business;
(iii) Coast Guard and other Federal, State, and local officials;
(iv) Local emergency personnel, such as police officers and firemen; and
(v) Other persons authorized by the owner or operator of the facility.
(7) Security measures. Guards must be stationed, or equivalent controls acceptable to the COTP must be used, to deter and detect unlawful entrance; to detect and report fire hazards, fires, and releases of dangerous cargoes and hazardous materials; to check the readiness of protective equipment; and to report other emergency situations at the facility.
(8) Coast Guard personnel. At any time, Coast Guard personnel must be allowed to enter the facility to conduct inspections or board vessels moored at the facility.
(9) Material handling equipment, trucks, and other motor vehicles. When dangerous cargo is being transferred or stored on the facility, material handling equipment, trucks, and other motor vehicles operated by internal combustion engines must meet the requirements of NFPA 307, chapter 9.
(10) Smoking. Smoking is allowed on the facility where permitted under State or local law. Signs must be posted marking authorized smoking areas. “No Smoking” signs must be conspicuously posted elsewhere on the facility.
(11) Rubbish and waste material. All rubbish, debris, and waste materials must be placed in adequate receptacles.
(12) Adequacy of equipment, materials, and standards. The COTP may determine that any equipment, material, or standard is not reasonably adequate under the circumstances. If so, the COTP informs the owner or operator in writing and provides an opportunity for the owner or operator to have the deficiency corrected.
(b) All designated waterfront facilities that handle dangerous cargo, not in transport units, must also meet the following:
(1) Arrangement of cargo, freight, merchandise, or material. Cargo, freight, merchandise, and other items or material on the facility must be arranged to provide access for firefighting and clearance for fire prevention according to NFPA 307, chapter 8-5.
(2) Portable fire extinguishers. Each facility must have and maintain, in adequate quantities and locations, portable fire extinguishers that meet the requirements of NFPA 10. These extinguishers must be inspected and maintained in accordance with NFPA 10.
(3) Electrical systems. All new electrical equipment and wiring installed on the facility must be of the same type and installed as specified under NFPA 70. All defective or dangerous electrical equipment and wiring must be promptly repaired, replaced, or permanently disconnected.
(4) Heating equipment and other sources of ignition. Open fires and open-flame lamps are prohibited on the facility. Heating equipment must meet NFPA 307, chapter 9-4.
(5) Maintenance stores and supplies. Hazardous material(s) used in the operation or maintenance of the facility may be stored only in amounts necessary for normal operating conditions. These materials must be stored in compartments that are remote from combustible material; constructed to provide safe storage; and kept clean and free of scrap materials, empty containers, soiled wiping rags, waste, and other debris. Flammable liquids must be stored according to NFPA 30, chapter 4. (Incorporated by reference, see § 126.5.)
(c) All designated waterfront facilities that handle dangerous cargo in transport units must also meet the following:
(1) Terminal yards. Terminal yards must conform to the standards in NFPA 307, chapter 5.
(2) Containers. Containers packed with dangerous cargo that are vertically stacked must be stacked no more than four high.
[USCG-1998-4302, 68 FR 55441, Sept. 26, 2003]
§ 126.16 Conditions for designating a “facility of particular hazard.”
(a) Basic requirements. The facility shall comply with all the conditions in § 126.15 except where specifically waived by § 126.11.
(b) Warning alarms. Warning alarms shall be installed at the waterside of such a facility to warn approaching or transiting water traffic of immediate danger in the event of fire or cargo release. Warning alarms shall be of the siren type, or the emergency rotating flashing light type, and be of sufficient intensity to be heard, or seen, a distance of 1 mile during normal facility working conditions. The alarm signal shall not conflict with local municipal prescription.
[CGFR 67-93, 32 FR 20774, Dec. 23, 1967]
§ 126.17 Permits required for handling designated dangerous cargo.
Designated dangerous cargo may be handled, loaded, discharged, or transported at any designated waterfront facility only if a permit therefor has been issued by the Captain of the Port. This permit requirement may be waived, at the discretion of the Captain of the Port, when such cargoes are contained within railroad cars or highway vehicles which are moved on or across a waterfront facility used primarily for the transfer of railroad cars or highway vehicles to or from a railroad or highway vehicle ferry or carfloat; provided such designated cargoes are not removed from, or placed in, the railroad car or highway vehicle while it is in or on such waterfront facility.
[CGFR 58-43, 23 FR 8542, Nov. 1, 1958]
§ 126.19 Issuance of permits for handling designated dangerous cargo.
Upon the application of the owners or operators of a designated waterfront facility or of their authorized representatives, the Captain of the Port is authorized to issue a permit for each transaction of handling, loading, discharging, or transporting designated dangerous cargo at such waterfront facility provided the following requirements are met:
(a) The facility shall comply in all respect with the regulations in this subchapter.
(b) The quantity of designated dangerous cargo, except Class 1 (explosive) materials shipped by or for the Armed Forces of the United States, on the waterfront facility and vessels moored thereto shall not exceed the limits as to maximum quantity, isolation and remoteness established by local, municipal, territorial, or State authorities. Each permit issued under these conditions shall specify that the limits so established shall not be exceeded.
(c) The quantity of designated dangerous cargo consisting of Class 1 (explosive) materials shipped by or for the Armed Forces of the United States on the waterfront facility and vessels moored thereto shall not exceed the limits as to maximum quantity, isolation and remoteness as established by the Captain of the Port. Each permit issued under these conditions shall specify that the limits so established shall not be exceeded.
[CGFR 53-27, 18 FR 5348, Sept. 3, 1953, as amended by CGD 92-050, 59 FR 39965, Aug. 5, 1994]
§ 126.21 Permitted transactions.
All permits issued pursuant to § 126.19 are hereby conditioned upon the observance and fulfillment of the following:
(a) The conditions set forth in § 126.15 shall at all times be strictly observed.
(b) No amount of designated dangerous cargo, except Class 1 (explosive) materials shipped by or for the Armed Forces of the United States, in excess of the maximum quantity established by local, municipal, territorial, or State authorities shall be present on the waterfront facility and vessels moored thereto.
(c) Designated dangerous cargo shall not be brought onto the waterfront facility from shore except when laden within a railroad car or highway vehicle and shall remain in such railroad car or highway vehicle except when removed as an incident of its prompt transshipment. Designated dangerous cargo shall not be brought onto the waterfront facility from a vessel except as an incident of its prompt transshipment by railroad car or highway vehicle.
(d) No other dangerous cargo shall be on the waterfront facility during the period of transactions involving designated dangerous cargo, unless its presence is authorized by the Captain of the Port. This shall not apply to maintenance stores and supplies on the waterfront facility in conformity with § 126.15(b)(5).
[CGFR 53-27, 18 FR 5348, Sept. 3, 1953, as amended by CGD 92-050, 59 FR 39965, Aug. 5, 1994; USCG-2014-0410, 79 FR 38434, July 7, 2014]
§ 126.23 Termination or suspension of permits.
Any permit issued pursuant to § 126.19 shall terminate automatically at the conclusion of the transaction for which the permit has been issued and may be terminated, or suspended, prior thereto by the Captain of the Port whenever he deems that the security or safety of the port or vessels or waterfront facilities therein so requires. Confirmation of such termination or suspension by the Captain of the Port shall be given to the permittee in writing.
[CGFR 51-37, 16 FR 8679, Aug. 28, 1951]
§ 126.25 Penalties for handling designated dangerous cargo without permit.
Handling, loading, discharging, or transporting any designated dangerous cargo without a permit, as provided under § 126.17, being in force, will subject persons responsible therefore to the civil or criminal penalties provided in 46 U.S.C. 70036.
[CGD 78-023, 44 FR 4643, Jan. 22, 1979, as amended by USCG-2020-0304, 85 FR 58279, Sept. 18, 2020]
§ 126.27 General permit for handling dangerous cargo.
A general permit is hereby issued for the handling, storing, stowing, loading, discharging or transporting of dangerous cargo (other than designated dangerous cargo) in bulk, portable tanks, containers, or packagings, at designated waterfront facilities, conditioned upon the observance and fulfillment of the following:
(a) The conditions set forth in § 126.15 shall at all times be strictly observed.
(b) You must notify the COTP before you handle, store, stow, load, discharge, or transport, in the net weight amounts specified, the following dangerous cargo, except when contained within transport units or railroad or highway vehicles being transported across or on the waterfront facility solely for transfer to or from a railroad-car ferry, highway-vehicle ferry, or carfloat:
(1) Class 1, Division 1.3 and Division 1.5 (Explosive) materials, with a net explosive quantity in excess of 36,400 kg (40 net tons) at any one time.
(2) Class 2, Division 2.1 (Flammable Gas) materials in bulk packaging; or Division 2.3 (Poison Gas) materials in excess of 72,800 kg (80 net tons) at any one time.
(3) A Class 7 (Radioactive) material in a highway route controlled quantity, as defined in 49 CFR 173.403.
(4) Flammable solids or oxidizers, in excess of 100 net tons at any one time.
(5) Flammable gases, in excess of 10 net tons at any one time.
(6) Poisons (Class A).
(7) A bulk shipment of a cargo of particular hazard.
(c) No Class 1 (explosive) materials (as defined in 49 CFR 173.50) or other dangerous cargoes prohibited from, or not permitted for, transportation by 46 CFR part 148 or 49 CFR parts 171 through 179 may be present on the waterfront facility.
(d) Break-bulk dangerous cargo must be segregated according to 49 CFR 176.83(a) through (c). No separation is required for break-bulk dangerous cargo in limited-quantity packaging.
(e) Transport units and portable tanks containing dangerous cargo must be segregated according to 49 CFR 176.83(a), (b), and (f). The requirements for vertical segregation and for on-deck, horizontal segregation in 49 CFR 176.83(f) apply. No separation is required for transport units containing dangerous cargo only in limited quantity packaging.
(f) Break-bulk dangerous cargo must be segregated from transport units containing dangerous cargo according to 49 CFR 176.83(e).
(g) Solid dangerous bulk cargo must be separated to prevent the interaction of incompatible materials in the event of an accident. Cargo not required to be segregated, when in break-bulk form, is not required to be segregated, when in bulk form. Dangerous cargo in break-bulk form must be segregated from solid dangerous cargo in bulk according to 49 CFR 176.83.
(h) Materials that are dangerous when wet (Division 4.3), water-soluble oxidizers (Division 5.1), and corrosive solids (Class 8) must be stored in a manner that prevents them from coming into contact with water.
(i) Corrosive liquids (Class 8) and liquid oxidizers (Division 5.1) must be handled and stored so that, in the event of a leak from their packaging, they would not come in contact with organic materials.
(j) Dangerous cargo stored on the facility must be arranged in a manner that retards the spread of fire, such as by interspersing dangerous cargo with inert or fire retardant material.
(k) Dangerous cargo stored on the facility, but not intended for use on the facility, must be packaged, marked, and labeled according to 49 CFR parts 171 through 180, as if the cargo was in transportation.
(l) Class 7 (Radioactive) material must be stored as specified in 49 CFR 173.447.
[CGD 78-023, 44 FR 4643, Jan. 22, 1979, as amended by CGD 75-238, 44 FR 63676, Nov. 5, 1979; CGD 75-238, 45 FR 57394, Aug. 28, 1980; CGD 92-050, 59 FR 39965, Aug. 5, 1994; USCG-1998-4302, 68 FR 55442, Sept. 26, 2003]
§ 126.28 Ammonium nitrate, ammonium nitrate fertilizers, fertilizer mixtures, or nitro carbo nitrate; general provisions.
(a) When any item of ammonium nitrate, ammonium nitrate fertilizers, fertilizer mixtures, or nitro carbo nitrate, described and defined as an oxidizer by the regulations of 49 CFR part 173 is handled, stored, stowed, loaded, discharged or transported on a waterfront facility, the following provisions shall apply:
(1) All outside containers shall be marked with the proper shipping name of the nitrate packed within the container.
(2) The building on a waterfront facility used for storage of any of these materials shall be of such construction as to afford good ventilation.
(3) Storage of any of these materials shall be at a safe distance from electric wiring, steam pipes, radiators or any heating mechanism.
(4) These materials shall be separated by a fire resistant wall or by a distance of at least 30 feet from organic materials or other chemicals and substances which could cause contamination such as flammable liquids, combustible liquids, corrosive liquids, chlorates, permanganates, finely divided metals, caustic soda, charcoal, sulfur, cotton, coal, fats, fish oils or vegetable oils.
(5) Storage of any of these materials shall be in a clean area upon clean wood dunnage, or on pallets over a clean floor. In the case of a concrete floor, storage may be made directly on the floor if it is first covered with a moisture barrier such as a polyethylene sheet or asphaltic laminated paper.
(6) Any spilled material shall be promptly and thoroughly cleaned up and removed from the waterfront facility. If any spilled material has remained in contact with a wooden floor for any length of time the floor shall be scrubbed with water and all spilled material shall be thoroughly dissolved and flushed away.
(7) An abundance of water for firefighting shall be readily available.
(8) Open drains, traps, pits or pockets which could be filled with molten ammonium nitrate if a fire occurred (and thus become potential detonators for the storage piles) must be eliminated or plugged.
Note:
See 49 CFR 176.415 for permit requirements for nitro carbo nitrate and certain ammonium nitrates.
[CGD 78-023, 44 FR 4644, Jan. 22, 1979]
§ 126.29 Supervision and control of dangerous cargo.
(a) Authority. The Captain of the Port is authorized to require that any transaction of handling, storing, stowing, loading, discharging, or transporting the dangerous cargo covered by this subchapter shall be undertaken and continued only under the immediate supervision and control of the Captain of the Port or his duly authorized representative. In case the Captain of the Port exercises such authority, all directions, instructions, and orders of the Captain of the Port or his representative, not inconsistent with this part, with respect to such handling, storing, stowing, loading, discharging, and transporting; with respect to the operation of the waterfront facility; with respect to vessels handling, stowing, loading, or discharging of dangerous cargo at anchorages when the operations are under the immediate control and supervision of the Captain of the Port or his duly authorized representative; with respect to the ingress and egress of persons, articles, and things and to their presence on the waterfront facilty or vessel; and with respect to vessels approaching, moored at, and departing from the waterfront facility, shall be promptly obeyed.
(b) Reporting discharge of dangerous liquid commodities into the waters of the United States. To enhance the safety of the port and to protect vessels, their cargo, and waterfront facilities therein, the discharge into the navigable waters of the United States of petroleum products, petroleum byproducts or other dangerous liquid commodities which may create a hazard or toxic condition in the port area will be immediately reported to the Captain of the Port or District Commander by the owner or master of the vessel from which the discharge occurred, or the owner or operator of a waterfront facility from which the discharge occurred.
[CGFR 69-89, 34 FR 17478, Oct. 29, 1969]
§ 126.30 What are the conditions for conducting welding and hotwork?
(a) The facility operator must ensure that all welding or hotwork conducted at the facility meets the requirements of this section. Each operator of a vessel moored to the facility must ensure that all welding or hotwork conducted on the vessel meets the requirements of this section.
(b) The COTP may require an operator of a facility or of a vessel moored at the facility to notify the COTP before conducting welding or hotwork. Regardless of whether or not the COTP required notice, the facility operator must notify the COTP before conducting welding or hotwork on a vessel when containerized dangerous cargo is located within the distances listed in paragraph (f) of this section.
(c) Before conducting welding or hotwork, flammable vapors, liquids, or solids must be completely removed from any container, pipe, or transfer line being worked on.
(d) Before conducting welding or hotwork on tanks, tanks used for storage of flammable or combustible substances must be tested and certified gas free.
(e) All welding and hotwork must be conducted according to NFPA 51B. (Incorporated by reference, see § 126.5.)
(f) Welding or hotwork is prohibited during gas freeing operations within 30.5 meters (100 feet) of bulk cargo operations involving flammable or combustible materials, within 30.5 meters (100 feet) of fueling operations, within 30.5 meters (100 feet) of explosives, or within 15.25 meters (50 feet) of other hazardous materials.
(g) If the welding or hotwork is on the boundary of a compartment (i.e., bulkhead, wall, or deck), a fire watch, in addition to that called for in NFPA 51B, must be stationed in the adjoining compartment.
(h) Personnel on fire watch must have no other duties except to watch for the presence of fire and to prevent the development of hazardous conditions.
(i) All safety precautions in relation to purging, inerting, or venting for all hotwork on containers must be followed.
(j) All local laws and ordinances must be followed.
(k) If a fire or other hazard occurs, all cutting, welding, or other hotwork equipment must be shut down.
[USCG-1998-4302, 68 FR 55442, Sept. 26, 2003]
§ 126.31 Termination or suspension of general permit.
The Captain of the Port is hereby authorized to terminate or to suspend the general permit granted by § 126.27 in respect to any particular designated waterfront facility whenever he deems that the security or safety of the port or vessels or waterfront facilities therein so requires. Confirmation of such termination or suspension shall be given to the permittee in writing. After such termination, the general permit may be revived by the District Commander with respect to such particular waterfront facility upon a finding by him that the cause of termination no longer exists and is unlikely to recur. After such suspension, the general permit shall be revived by the Captain of the Port with respect to such particular waterfront facility when the cause of suspension no longer exists, and he shall so advise the permittee in writing.
[CGFR 51-37, 16 FR 8680, Aug. 28, 1951, as amended by CGFR 69-89, 34 FR 17479, Oct. 29, 1969]
§ 126.33 Penalties for handling dangerous cargo without permit.
Handling, storing, stowing, loading, discharging, or transporting any dangerous cargo covered by § 126.27 under circumstances not covered by the general permit granted in § 126.27 or when such general permit is not in force will subject persons responsible therefor to the civil or criminal penalties provided in 46 U.S.C. 70036.
[CGD 78-023, 44 FR 4644, Jan. 22, 1979, as amended by USCG-2020-0304, 85 FR 58279, Sept. 18, 2020]
§ 126.35 Primary responsibility.
Nothing contained in the rules, regulations, conditions, and designations in this part shall be construed as relieving the masters, owners, operators, and agents of vessels, docks, piers, wharves, or other waterfront facilities from their primary responsibility for the security of such vessels, docks, piers, wharves, or waterfront facilities.
[CGFR 51-37, 16 FR 8680, Aug. 28, 1951]
§ 126.37 Separability.
If any provision of the rules, regulations, conditions, or designations contained in this part or the application of such provision to any person, waterfront facility, or circumstances shall be held invalid, the validity of the remainder of the rules, regulations, conditions, or designations contained in this part and applicability of such provision to other persons, waterfront facilities, or circumstances, shall not be affected thereby.
[CGFR 51-37, 16 FR 8680, Aug. 28, 1951]
PART 127 WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS
Authority: 33 U.S.C. 1504(j)(2); 46 U.S.C. 70011 and 70034; 46 U.S.C. Chapter 701; DHS Delegation No. 00170.1, Revision No. 01.2, paragraph (II)(92)(a).
Source: CGD 78-038, 53 FR 3376, Feb. 7, 1988, unless otherwise noted.
Subpart A General
§ 127.001 Applicability.
(a) Subparts A and B of this part apply to the marine transfer area for LNG of each new waterfront facility handling LNG and to new construction in the marine transfer area for LNG of each waterfront facility handling LNG.
(b) Subpart A of this part and §§ 127.301 through 127.617 apply to the marine transfer area for LNG of each active existing waterfront facility handling LNG.
(c) Sections 127.007(b), (c), and (d), and 127.019(b) of subpart A of this part apply to the marine transfer area for LNG of each inactive facility.
(d) Subparts A and C of this part apply to the marine transfer area for LHG of each active waterfront facility handling LHG.
(e) Sections 127.007 (b), (c), and (d); 127.019(b); and 127.1325(c) of subparts A and C of this part apply to the marine transfer area for LHG of each inactive facility.
(f) Waterfront facilities handling LNG and LHG constructed, expanded, or modified under a contract awarded after March 4, 2022, are required to comply with the applicable standards referenced in § 127.003. All other facilities, unless expanded or modified in accordance with this part, are required to meet previously applicable standards but may request to apply a later edition of the standards in accordance with § 127.017.
[CGD 88-049, 60 FR 39794, Aug. 3, 1995, as amended by USCG-2007-27022, 75 FR 29426, May 26, 2010; 87 FR 5689, Feb. 2, 2022]
§ 127.003 Incorporation by reference.
Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish a document in the Federal Register and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Operating and Environmental Standards (CG-OES), 2703 Martin Luther King Jr. Avenue SE, STOP 7509, Washington, DC 20593-7509, 202-372-1410, and is available from the sources listed in the following paragraphs. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, email fr.inspection@nara.gov or go to https://www.archives.gov/federal-register/cfr/ibr-locations.html. (See § 127.017 for alternative compliance methods.)
(a) American Petroleum Institute (API), 200 Massachusetts Avenue NW, Suite 1100, Washington, DC 20001-5571, 202-682-8000, http://www.api.org.
(1) API Recommended Practice 2003 (“API RP 2003”), Protection Against Ignitions Arising Out of Static, Lightning and Stray Currents, Eighth Edition, September 2015, for § 127.1101(h).
(2) [Reserved]
(b) The American Society of Mechanical Engineers (ASME), Two Park Avenue, New York, NY 10016-5990, 800-843-2763, https://www.asme.org.
(1) ASME B16.5-2020, Pipe Flanges and Flanged Fittings, NPS 1/2 Through NPS 24 Metric/Inch Standard, Issued January 29, 2021, for § 127.1102(a).
(2) ASME B31.3-2020, Process Piping, ASME Code for Pressure Piping, B31, Issued June 18, 2021, for § 127.1101(a).
(c) ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA, 19428-2959, 610-832-9500, https://www.astm.org.
(1) ASTM E119-20, Standard Test Methods for Fire Tests of Building Construction and Materials, approved May 1, 2020, for § 127.005.
(2) ASTM F1121-87 (Reapproved 2019), Standard Specification for International Shore Connections for Marine Fire Applications, approved December 1, 2019, for §§ 127.611 and 127.1511.
(d) Det Norske Veritas (DNV), Veritasveien 1, 1363 Høvik Norway, +47 6757 9900, https://www.dnv.com.
(1) DNVGL-RP-G105, Recommended Practice, Development and operation of liquefied natural gas bunkering facilities, October 2015 Edition, for § 127.008(d).
(2) [Reserved]
(e) International Electrotechnical Commission (IEC), IEC Central Office, 3 rue de Varembé, P.O. Box 131, CH 1211, Geneva 20, Switzerland, +41 22 919 02 11, https://www.iec.ch.
(1) IEC 60079-29-1, Explosive atmospheres—Part 29-1: Gas detectors—Performance requirements of detectors for flammable gases, Edition 2.0, July 2016, for § 127.1203(a).
(2) [Reserved]
(f) International Organization for Standardization (ISO), Chemin de Blandonnet 8, CP 401, 1214 Vernier, Geneva, Switzerland, +41 22 749 01 11, https://www.iso.org.
(1) ISO/TS 18683:2015(E), (“ISO/TS 18683”), Guidelines for systems and installations for supply of LNG as fuel to ships, First Edition, January 15, 2015, for § 127.008(d)(1).
(2) ISO 28460:2010(E), (“ISO 28460”), Petroleum and natural gas industries—Installation and equipment for liquefied natural gas—Ship-to-shore interface and port operations, First edition, December 15, 2010, for § 127.008(d)(2).
(g) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169-7471, 800-344-3555, https://www.nfpa.org.
(1) NFPA 10, Standard for Portable Fire Extinguishers, 2018 Edition, effective August 21, 2017, for §§ 127.603(a) and 127.1503.
(2) NFPA 30, Flammable and Combustible Liquids Code, 2018 Edition, effective September 6, 2017, for §§ 127.313(b) and 127.1313(b).
(3) NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, 2019 Edition, effective July 15, 2018, for §§ 127.405(b) and 127.1405(b).
(4) NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG), 2019 Edition, effective November 25, 2018, for §§ 127.008(d), 127. 101, 127.201(b) and (c), 127.405(a) and (b), and 127.603(a).
(5) NFPA 70, National Electrical Code, 2020 Edition, effective August 25, 2019, for §§ 127.107(a) and (c), 127.201(c), and 127.1107.
[87 FR 5689, Feb. 2, 2022]
§ 127.005 Definitions.
As used in this part:
Active means accomplishing the transfer of LHG or LNG, or scheduling one to occur, within 12 months of the current date.
Captain of the Port (COTP) means the Coast Guard officer designated by the Commandant to command a Captain of the Port Zone as described in part 3 of this chapter, or an authorized representative.
Commandant means the Commandant of the U.S. Coast Guard or an authorized representative.
Control room means a space within the LNG waterfront facility from which facility operations are controlled.
District Commander means the Coast Guard officer designated by the Commandant to command a Coast Guard District as described in part 3 of this chapter, or an authorized representative.
Environmentally sensitive areas include public parks and recreation areas, wildlife and waterfowl refuges, fishing grounds, wetlands, other areas deemed to be of high value to fish and wildlife resources, historic sites, and other protected areas.
Existing as applied to a waterfront facility means a facility handling LNG constructed or being constructed under a contract awarded before June 2, 1988, or a facility handling LHG constructed or being constructed under a contract awarded before January 30, 1996.
Facility means either a waterfront facility handling LHG or a waterfront facility handling LNG, and includes LNG fuel facilities.
Fire endurance rating means the duration for which an assembly or structural unit will contain a fire or retain structural integrity when exposed to the temperatures specified in the standard time-temperature curve in ASTM E119-20 (incorporated by reference, see § 127.003).
Flammable product means a product indicated by the letter “F” or by the letters “F + T” in Table 127.005.
Inactive means not active.
Impounding space means a space formed by dikes and floors that confines a spill of LHG or LNG.
LHG means liquefied hazardous gas.
LHG vessel means a vessel constructed or converted to carry LHG, in bulk.
Liquefied hazardous gas (LHG) means a liquid containing one or more of the products listed in Table 127.005.
Liquefied natural gas (LNG) means a liquid or semisolid consisting mostly of methane and small quantities of ethane, propane, nitrogen, or other natural gases.
Liquefied petroleum gas (LPG) means a liquid consisting mostly of propane or butane or both.
LNG means liquefied natural gas.
LNG fuel facility means a waterfront facility that handles LNG for the sole purpose of providing LNG from shore-based structures to vessels for use as a marine fuel, and that does not transfer LNG to or receive LNG from vessels capable of carrying LNG in bulk as cargo.
LNG vessel means a vessel constructed or converted to carry LNG, in bulk.
Loading flange means the connection or group of connections in the cargo transfer pipeline on the facility that connects the facility pipeline to the vessel pipeline.
Marine transfer area for LHG means that part of a waterfront facility handling LHG between the vessel, or where the vessel moors, and the first shutoff valve on the pipeline immediately inland of the terminal manifold or loading arm, including the entire part of a pier or wharf used to serve LHG vessels.
Marine transfer area for LNG means that part of a waterfront facility handling LNG between the vessel, or where the vessel moors, and the last manifold or valve immediately before the receiving tanks.
Mating flange means that flange in the product-transfer pipeline on a waterfront facility handling LHG or a waterfront facility handling LNG that connects this pipeline to the pipeline or transfer hose of the vessel.
MAWP means maximum allowable working pressure.
Maximum allowable working pressure (MAWP) means the maximum gauge pressure permissible at the top of equipment, containers, or pressure vessels while operating at design temperature.
New as applied to a waterfront facility means a facility handling LNG constructed or being constructed under a contract awarded on or after June 2, 1988, or a facility handling LHG constructed or being constructed under a contract awarded on or after January 30, 1996.
Person in charge of transfer operations on the vessel is the person designated the person in charge of cargo transfer under 46 CFR 154.1831.
Release means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment, except a minor release of LHG or its vapor, that may occur during the routine handling of LHG. No release is minor if it creates an atmosphere that exceeds the Lower Flammable Limit (LFL) for a flammable product or any Permissible Exposure Limit (PEL) listed in 29 CFR 1910.1000, Table Z-1 or Z-2, for a toxic product.
Substructure means the deck of a pier or wharf and the structural components below that deck.
Toxic product means a product indicated by the letter “T” or by the letters “F + T” in Table 127.005.
Waterfront facility handling LHG means any structure on, in, or under the navigable waters of the United States, or any structure on land or any area on shore immediately adjacent to such waters, used or capable of being used to transfer liquefied hazardous gas, in bulk, to or from a vessel.
Waterfront facility handling LNG means any structure on, in, or under the navigable waters of the United States, or any structure on land or any area on shore immediately adjacent to such waters, used or capable of being used to transfer liquefied natural gas, in bulk, to or from a vessel.
Table 127.005—List of Products and Hazards
Product | Hazard
Acetaldehyde | F + T
Ammonia, anhydrous | T
Butadiene | F
Butanes | F
Butane and propane (mixtures) | F
Butylenes | F
Chlorine | T
Dimethylamine | F + T
Ethane | F
Ethyl chloride | F + T
Ethylene | F
Ethylene oxide | F + T
Methyl-acetylene and propadiene (mixtures) | F
Methyl bromide | F + T
Methyl chloride | F + T
Propane | F
Propylene | F
Sulphur dioxide | T
Vinyl chloride | F + T
Note: “F” indicates a flammable product. “T” indicates a toxic product. “F + T” indicates a product both flammable and toxic.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39795, Aug. 3, 1995; CGD 97-023, 62 FR 33363, June 19, 1997; 87 FR 5689, Feb. 2, 2022]
§ 127.007 Letter of intent and waterway suitability assessment for waterfront facilities handling LNG or LHG.
(a) An owner or operator intending to build a new facility handling LNG or LHG, or an owner or operator planning new construction to expand marine terminal operations in any facility handling LNG or LHG, where the construction or expansion will result in an increase in the size or frequency of LNG or LHG marine traffic on the waterway associated with a facility, must submit a Letter of Intent (LOI) to the Captain of the Port (COTP) of the zone in which the facility is or will be located. The LOI must meet the requirements in paragraph (c) of this section.
(1) The owner or operator of an LNG facility must submit the LOI to the COTP no later than the date that the owner or operator files a pre-filing request with the Federal Energy Regulatory Commission (FERC) under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the start of construction. The LOI must include the nation of registry for, and the nationality or citizenship of the officers and crew serving on board, vessels transporting LNG that are reasonably anticipated to be servicing the LNG facility.
(2) The owner or operator of an LHG facility must submit the LOI to the COTP no later than the date that the owner or operator files with the Federal or State agency having jurisdiction, but, in all cases, at least 1 year prior to the start of construction.
(b) An owner or operator intending to reactivate an inactive facility must submit an LOI that meets paragraph (c) of this section to the COTP of the zone in which the facility is located.
(1) The owner or operator of an LNG facility must submit the LOI to the COTP no later than the date the owner or operator files a pre-filing request with FERC under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the start of LNG transfer operations.
(2) The owner or operator of an LHG facility must submit the LOI to the COTP no later than the date the owner or operator files with the Federal or State agency having jurisdiction, but, in all cases, at least 1 year prior to the start of LHG transfer operations.
(c) Each LOI must contain—
(1) The name, address, and telephone number of the owner and operator;
(2) The name, address, and telephone number of the Federal, State, or local agency having jurisdiction for siting, construction, and operation;
(3) The name, address, and telephone number of the facility;
(4) The physical location of the facility;
(5) A description of the facility;
(6) The LNG or LHG vessels' characteristics and the frequency of LNG or LHG shipments to or from the facility; and
(7) Charts showing waterway channels and identifying commercial, industrial, environmentally sensitive, and residential areas in and adjacent to the waterway used by the LNG or LHG vessels en route to the facility, within at least 25 kilometers (15.5 miles) of the facility.
(d) The owner or operator who submits an LOI under paragraphs (a) or (b) of this section must notify the COTP in writing within 15 days of any of the following:
(1) There is any change in the information submitted under paragraphs (c)(1) through (c)(7) of this section; or
(2) No LNG or LHG transfer operations are scheduled within the next 12 months.
(e) An owner or operator intending to build a new LNG or LHG facility, or an owner or operator planning new construction to expand marine terminal operations in any facility handling LNG or LHG, where the construction or expansion will result in an increase in the size or frequency of LNG or LHG marine traffic on the waterway associated with a facility, must file or update as appropriate a waterway suitability assessment (WSA) with the COTP of the zone in which the facility is or will be located. The WSA must consist of a Preliminary WSA and a Follow-on WSA. A COTP may request additional information during review of the Preliminary WSA or Follow-on WSA.
(f) The Preliminary WSA must—
(1) Be submitted to the COTP with the LOI; and
(2) Provide an initial explanation of the following—
(i) Port characterization;
(ii) Characterization of the LNG or LHG facility and LNG or LHG tanker route;
(iii) Risk assessment for maritime safety and security;
(iv) Risk management strategies; and
(v) Resource needs for maritime safety, security, and response.
(g) The Follow-on WSA must—
(1) Be submitted to the COTP as follows:
(i) The owner or operator of an LNG facility must submit the Follow-on WSA to the COTP no later than the date the owner or operator files its application with FERC pursuant to 18 CFR parts 153 or 157, or if no application to FERC is required, at least 180 days before the owner or operator begins transferring LNG.
(ii) The owner or operator of an LHG facility must submit the Follow-on WSA to the COTP in all cases at least 180 days before the owner or operator begins transferring LHG.
(2) Contain a detailed analysis of the elements listed in §§ 127.007(f)(2), 127.009(d), and 127.009(e) of this part.
(h) Until the facility begins operation, owners or operators must:
(1) Annually review their WSAs and submit a report to the COTP as to whether changes are required. The deadline for the required annual report should coincide with the date of the COTP's Letter of Recommendation, which indicates review and validation of the Follow-on WSA has been completed.
(2) In the event that revisions to the WSA are needed, report to the COTP the details of the necessary revisions, along with a timeline for completion.
(3) Update the WSA if there are any changes in conditions, such as changes to the port environment, the LNG or LHG facility, or the tanker route, that would affect the suitability of the waterway for LNG or LHG traffic.
(4) Submit a final report to the COTP at least 30 days, but not more than 60 days, prior to the start of operations.
(i) An owner or operator intending to construct a new LNG fuel facility or modify any LNG fuel facility, or reactivate an inactive LNG fuel facility, may comply with § 127.008 in lieu of meeting the requirements in this section.
[USCG-2007-27022, 75 FR 29426, May 26, 2010, as amended by USCG-2019-0444, 87 FR 5689, Feb. 2, 2022]
§ 127.008 Letter of intent and operational risk assessment for LNG fuel facilities.
(a) An owner or operator intending to build a new LNG fuel facility, modify construction of any LNG fuel facility, or reactivate an inactive LNG fuel facility electing to complete an operational risk assessment (ORA) in lieu of a WSA as outlined in § 127.007, must submit an LOI and ORA to the COTP of the zone in which the LNG fuel facility is or will be located at least 1 year prior to the start of LNG transfer operations.
(b) Each LOI must contain the information in § 127.007(c)(1) through (c)(5).
(c) The owner or operator who submits an LOI under paragraph (a) of this section must notify the COTP in writing within 15 days of any of the following:
(1) There is any change in the information submitted under paragraph (b) of this section; or
(2) No LNG fuel transfer operations are scheduled within the next 12 months.
(d) The ORA required by paragraph (a) must:
(1) Be carried out in accordance with Chapter 7 of ISO/TS 18683 and Appendix D of DNVGL-RP-G105; or Chapter 19 of NFPA 59A (all incorporated by reference, see § 127.003); or other industry developed risk assessment method acceptable to the Office of Operating and Environmental Standards, Commandant (CG-OES); and
(2) Consider possible factors affecting the ship/shore interface and port operations described in Section 6 of ISO 28460 (incorporated by reference, see § 127.003).
[87 FR 5690, Feb. 2, 2022]
§ 127.009 Letter of recommendation.
(a) After the COTP receives the information and analyses required by § 127.007 or § 127.008, the COTP issues a Letter of Recommendation (LOR) as to the suitability of the waterway for LNG or LHG marine traffic or the operational safety and security of the LNG fuel facility to the Federal, State, or local government agencies having jurisdiction for siting, construction, and operation, and, at the same time, sends a copy to the owner or operator, based on the—
(1) Information submitted under § 127.007 or § 127.008;
(2) Density and character of marine traffic in the waterway;
(3) Locks, bridges, or other man-made obstructions in the waterway;
(4) Following factors adjacent to the facility such as—
(i) Depths of the water;
(ii) Tidal range;
(iii) Protection from high seas;
(iv) Natural hazards, including reefs, rocks, and sandbars;
(v) Underwater pipelines and cables;
(vi) Distance of berthed vessel from the channel and the width of the channel; and
(5) Any other issues affecting the safety and security of the waterway and considered relevant by the Captain of the Port.
(b) An LOR issued under this section is a recommendation from the COTP to the agency having jurisdiction as described in paragraph (a), and does not constitute agency action for the purposes of § 127.015 or the Administrative Procedure Act (5 U.S.C. 551 et seq.).
(c) The owner or operator, or a State, local, or Indian tribal government in the vicinity of the facility, may request reconsideration as set forth in § 127.010.
(d) Persons other than the owner or operator, or State, local, or Indian tribal government in the vicinity of the facility, may comment on the LOR by submitting comments and relevant information to the agency having jurisdiction, as described in paragraph (a), for that agency's consideration in its permitting process.
(e) Paragraphs (c) and (d) of this section apply to LORs issued after December 28, 2012. For LORs issued prior to that date, persons requesting reconsideration must follow the process set forth in § 127.015.
[USCG-2011-0227, 77 FR 70890, Nov. 28, 2012, as amended by USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.010 Reconsideration of the Letter of Recommendation.
(a) A person requesting reconsideration pursuant to § 127.009(c) must submit a written request to the Captain of the Port (COTP) who issued the Letter of Recommendation (LOR), and send a copy of the request to the agency to which the LOR was issued. The request must explain why the COTP should reconsider his or her recommendation.
(b) In response to a request described in paragraph (a) of this section, the COTP will do one of the following—
(1) Send a written confirmation of the LOR to the agency to which the LOR was issued, with copies to the person making the request and the owner or operator; or
(2) Revise the LOR, and send the revised LOR to the agency to which the original LOR was issued, with copies to the person making the request and the owner or operator.
(c) A person whose request for reconsideration results in a confirmation as described in paragraph (b)(1) of this section, and who is not satisfied with that outcome, may request, in writing, the opinion of the District Commander of the district in which the LOR was issued.
(1) The request must explain why the person believes the District Commander should instruct the COTP to reconsider his or her recommendation.
(2) A person making a request under paragraph (c) of this section must send a copy of the request to the agency to which the LOR was issued.
(3) In response to the request described in this paragraph (c), the District Commander will do one of the following—
(i) Send a written confirmation of the LOR to the agency to which the LOR was issued, with copies to the person making the request, the owner or operator, and the COTP; or
(ii) Instruct the COTP to reconsider the LOR, and send written notification of that instruction to the agency to which the original LOR was issued, with copies to the person making the request and the owner or operator.
(d) The District Commander's written confirmation described in paragraph (c)(3)(i) of this section ends the reconsideration process with respect to that specific request for reconsideration. If the COTP issues an LOR pursuant to paragraph (b)(2) or (c)(3)(ii) of this section, persons described in § 127.009(c) may request reconsideration of that revised LOR using the process beginning in paragraph (a) of this section.
[USCG-2011-0227, 77 FR 70890, Nov. 28, 2012]
§ 127.011 Inspections of waterfront facilities.
The operator must ensure that the COTP or his representative is allowed to make reasonable examinations and inspections to determine whether the facility meets this part.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39795, Aug. 3, 1995; USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.013 Suspension of transfer operations.
(a) The COTP may issue an order to the operator to suspend LHG or LNG transfer operations if the COTP finds any condition requiring immediate action to—
(1) Prevent damage to, or the destruction of, any bridge or other structure on or in the navigable waters of the United States, or any land structure or shore area immediately adjacent to such waters; and
(2) Protect the navigable waters and the resources therein from harm resulting from vessel or structure damage, destruction, or loss.
(b) Each order to suspend transfer operations issued under paragraph (a) of this section—
(1) Is effective immediately;
(2) Contains a statement of each condition requiring immediate action; and
(3) Is withdrawn by the COTP whenever each condition is corrected or no longer exists.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39795, Aug. 3, 1995]
§ 127.015 Appeals.
(a) Any person directly affected by an action taken under this part may request reconsideration by the Coast Guard officer responsible for that action.
(b) Except as provided under paragraph (e) of this section, any person not satisfied with a ruling made under the procedure contained in paragraph (a) of this section may—
(1) Appeal that ruling in writing to the District Commander of the district in which the action was taken; and
(2) Supply supporting documentation and evidence that the appellant wishes to have considered.
(c) The District Commander issues a ruling after reviewing the appeal submitted under paragraph (b) of this section. Except as provided under paragraph (e) of this section, any person not satisfied with this ruling may—
(1) Appeal that ruling in writing to the Assistant Commandant for Prevention Policy, U.S. Coast Guard, (CG-5P), 2703 Martin Luther King Jr. Ave. SE, Stop 7509, Washington, DC 20593-7509; and
(2) Supply supporting documentation and evidence that the appellant wishes to have considered.
(d) The Assistant Commandant for Prevention Policy issues a ruling after reviewing the appeal submitted under paragraph (c) of this section, which is final agency action.
(e) If the delay in presenting a written appeal has an adverse impact on the operations of the appellant, the appeal under paragraph (b) or (c) of this section—
(1) May be presented orally; and
(2) Must be submitted in writing within five days after the oral presentation—
(i) With the basis for the appeal and a summary of the material presented orally; and
(ii) To the same Coast Guard official who heard the oral presentation.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 96-026, 61 FR 33665, June 28, 1996; CGD 97-023, 62 FR 33363, June 19, 1997; USCG-2002-12471, 67 FR 41332, June 18, 2002; USCG-2010-0351, 75 FR 36283, June 25, 2010; USCG-2014-0410, 79 FR 38434, July 7, 2014; USCG-2020-0304, 85 FR 58279, Sept. 18, 2020; USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.017 Alternatives.
(a) The COTP may allow alternative procedures, methods, or equipment standards, including alternatives to standards listed in § 127.003, to be used by an operator instead of any requirements in this part if—
(1) The operator submits a written request for the alternative at least 30 days before facility operations under the alternative would begin, unless the COTP authorizes a shorter time; and
(2) The alternative provides at least the same degree of safety provided by the regulations in this part.
(b) The COTP approves or disapproves any alternative requested under paragraph (a) of this section—
(1) In writing; or
(2) Orally, with subsequent written confirmation.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.019 Operations Manual and Emergency Manual: Procedures for examination.
(a) The owner or operator of an active facility must submit an Operations Manual and Emergency Manual in printed or electronic format to the COTP of the zone in which the facility is located.
(b) At least 30 days before transferring LHG or LNG, the owner or operator of a new or an inactive facility must submit an Operations Manual and Emergency Manual in printed or electronic format to the Captain of the Port of the zone in which the facility is located, unless the manuals have been examined and there have been no changes since that examination.
(c) Operations Manuals and Emergency Manuals submitted after September 10, 2021 must include a date, revision date or other revision-specific identifying information.
(d) If the COTP finds that the Operations Manual meets § 127.305 or § 127.1305 and that the Emergency Manual meets § 127.307 or § 127.1307, the COTP will provide notice to the facility stating each manual has been examined by the Coast Guard. This notice will include the revision date of the manual or other revision-specific identifying information.
(e) If the COTP finds that the Operations Manual or the Emergency Manual does not meet this part, the COTP will notify the facility with an explanation of why it does not meet this part.
[USCG-2020-0315, 86 FR 43940, Aug. 11, 2021]
Subpart B Waterfront Facilities Handling Liquefied Natural Gas
§ 127.101 Design and construction: General.
The marine transfer area for LNG must meet the following criteria in NFPA 59A (incorporated by reference, see § 127.003):
(a) Chapter 5, Section 5.3.1.7;
(b) Chapter 6, Section 6.7;
(c) Chapter 10;
(d) Chapter 11, except Sections 11.9, and 11.10;
(e) Chapter 12;
(f) Chapter 15, except Sections 15.4 and 15.6; and
(g) Annex B.
[USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.103 Piers and wharves.
(a) If the waterfront facility handling LNG is in a region subject to earthquakes, the piers and wharves must be designed to resist earthquake forces.
(b) Substructures, except moorings and breasting dolphins, that support or are within 5 meters (16.4 feet) of any pipe or equipment containing LNG, or are within 15 meters (49.2 feet) of a loading flange, must—
(1) Be made of concrete or steel; and
(2) Have a fire endurance rating of not less than two hours.
(c) LNG or LPG storage tanks must have the minimum volume necessary for—
(1) Surge protection;
(2) Pump suction supply; or
(3) Other process needs.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.105 Layout and spacing of marine transfer area for LNG.
(a) LNG impounding spaces must be located so that the heat flux from a fire over the impounding spaces does not cause structural damage to an LNG vessel moored or berthed at the waterfront facility handling LNG.
(b) Each LNG loading flange must be located at least 300 meters (984.3 feet) from the following which are primarily intended for the use of the general public or railways:
(1) Each bridge crossing a navigable waterway.
(2) Each entrance to any tunnel under a navigable waterway.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.107 Electrical power systems.
(a) The electrical power system must have a power source and a separate emergency power source, so that failure of one source does not affect the capability of the other source. The system must meet NFPA 70 (incorporated by reference, see § 127.003).
(b) The emergency power source must provide enough power for the operation of the—
(1) Emergency shutdown system;
(2) Communications equipment;
(3) Firefighting equipment; and
(4) Emergency lighting.
(c) If an auxiliary generator is used as an emergency power source, it must meet Section 700.12 of NFPA 70 (incorporated by reference, see § 127.003).
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.109 Lighting systems.
(a) The marine transfer area for LNG must have a lighting system and separate emergency lighting.
(b) All outdoor lighting must be located or shielded so that it is not confused with any aids to navigation and does not interfere with navigation on the adjacent waterways.
(c) The lighting system must provide an average illumination on a horizontal plane one meter (3.3 feet) above the deck that is—
(1) 54 lux (five foot-candles) at any loading flange; and
(2) 11 lux (one foot-candle) at each work area.
(d) The emergency lighting must provide lighting for the operation of the—
(1) Emergency shutdown system;
(2) Communications equipment; and
(3) Firefighting equipment.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39795, Aug. 3, 1995]
§ 127.111 Communications systems.
(a) The marine transfer area for LNG must have a ship-to-shore communication system and a separate emergency ship-to-shore communication system.
(b) Each ship-to-shore communication system must be a dedicated system that allows voice communication between the person in charge of transfer operations on the vessel, the person in charge of shoreside transfer operations, and personnel in the control room.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39795, Aug. 3, 1995]
§ 127.113 Warning signs.
(a) The marine transfer area for LNG must have warning signs that—
(1) Meet paragraph (b) of this section;
(2) Can be seen from the shore and the water; and
(3) Have the following text:
Warning Dangerous Cargo No Visitors No Smoking No Open Lights
(b) Each letter in the words on the sign must be—
(1) Block style;
(2) Black on a white background; and
(3) 7.6 centimeters (3 inches) high.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
12 Equipment
§ 127.201 Sensing and alarm systems.
(a) Fixed sensors must have audio and visual alarms in the control room and audio alarms nearby.
(b) Fixed sensors that continuously monitor for LNG vapors must—
(1) Be in each enclosed area where vapor or gas may accumulate; and
(2) Meet Section 16.4 of NFPA 59A (incorporated by reference, see § 127.003).
(c) Fixed sensors that continuously monitor for flame, heat, or products of combustion must—
(1) Be in each enclosed or covered Class I, Division 1, hazardous location defined in Section 500.5(B)(1) of NFPA 70 (incorporated by reference, see § 127.003) and each area in which flammable or combustible material is stored; and
(2) Meet Section 16.4 of NFPA 59A (incorporated by reference, see § 127.003).
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.203 Portable gas detectors.
The marine transfer area for LNG must have at least two portable gas detectors capable of measuring 0-100% of the lower flammable limit of methane.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.205 Emergency shutdown.
Each transfer system must have an emergency shutdown system that—
(a) Can be activated manually; and
(b) Is activated automatically when the fixed sensors under § 127.201(b) measure LNG concentrations exceeding 40% of the lower flammable limit.
§ 127.207 Warning alarms.
(a) The marine transfer area for LNG must have a rotating or flashing amber light with a minimum effective flash intensity, in the horizontal plane, of 5000 candelas. At least 50% of the required effective flash intensity must be maintained in all directions from 1.0 degree above to 1.0 degree below the horizontal plane.
(b) The marine transfer area for LNG must have a siren with a minimum 1/3-octave band sound pressure level at l meter of 125 decibels referenced to 0.0002 microbars. The siren must be located so that the sound signal produced is audible over 360 degrees in a horizontal plane.
(c) Each light and siren must be located so that the warning alarm is not obstructed for a distance of 1.6 km (1 mile) in all directions.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
13 Operations
§ 127.301 Persons in charge of shoreside transfer operations: Qualifications and certification.
(a) No person may serve, and the operator of the waterfront facility handling LNG may not use the services of any person, as a person in charge of shoreside transfer operations, unless that person—
(1) Has at least 48 hours of LNG transfer experience;
(2) Knows the hazards of LNG;
(3) Knows the rules of this subpart; and
(4) Knows the procedures in the examined Operations Manual and the examined Emergency Manual.
(b) Before a person in charge of shoreside transfer operations supervises a transfer, the operator must certify in writing that the criteria in paragraph (a) of this section are met. The operator must maintain a copy of each current certification available for inspection at the waterfront facility handling LNG.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; 87 FR 5691, Feb. 2, 2022]
§ 127.303 Compliance with suspension order.
If an order to suspend is given to the operator or owner of the waterfront facility handling LNG, no LNG transfer operations may be conducted at the facility until the order is withdrawn by the COTP.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.305 Operations Manual.
Each Operations Manual must contain—
(a) A description of the transfer system including mooring areas, transfer connections, control rooms, and diagrams of the piping and electrical systems;
(b) The duties of each person assigned for transfer operations;
(c) The maximum relief valve setting or maximum allowable working pressure of the transfer system;
(d) The facility telephone numbers of facility supervisors, persons in charge of shoreside transfer operations, personnel on watch in the marine transfer area for LNG, and security personnel;
(e) A description of the security systems for the marine transfer area for LNG;
(f) The procedures for—
(1) Transfer operations including gauging, cool down, pumping, venting, and shutdown;
(2) Transfer operations start-up and shutdown;
(3) Security violations; and
(4) The communications systems; and
(g) A description of the training programs established under § 127.503.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.307 Emergency Manual.
Each Emergency Manual must contain—
(a) LNG release response procedures, including contacting local response organizations;
(b) Emergency shutdown procedures;
(c) A description of the fire equipment and systems and their operating procedures;
(d) A description of the emergency lighting and emergency power systems;
(e) The telephone numbers of local Coast Guard units, hospitals, fire departments, police departments, and other emergency response organizations;
(f) If the waterfront facility handling LNG has personnel shelters, the location of and provisions in each shelter;
(g) First aid procedures and if there are first aid stations, the locations of each station; and
(h) Emergency procedures for mooring and unmooring a vessel.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.309 Operations Manual and Emergency Manual: Use.
The operator must ensure that—
(a) LNG transfer operations are not conducted unless the person in charge of transfer for the waterfront facility handling LNG has in the marine transfer area a readily available printed or electronic copy of the most recently examined Operations Manual and Emergency Manual. Electronic devices used to display the manuals must comply with applicable electrical safety standards in this part;
(b) Each transfer operation is conducted in accordance with the examined Operations Manual; and
(c) Each emergency response is in accordance with the examined Emergency Manual.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2020-0315, 86 FR 43940, Aug. 11, 2021]
§ 127.311 Motor vehicles.
(a) The operator must designate and mark parking spaces that—
(1) Do not block fire lanes;
(2) Do not impede any exits;
(3) Are not located in any impounding space; and
(4) Are not within 15 meters (49.2 feet) of any storage tank or loading flange.
(b) During transfer operations, no person may—
(1) Stop or park a motor vehicle in a space that is not designated a parking space; or
(2) Refuel any motor vehicle.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5690, Feb. 2, 2022]
§ 127.313 Bulk storage.
(a) The operator must ensure that only the following flammable materials are stored in the marine transfer area for LNG:
(1) LNG.
(2) LPG.
(3) Vessel fuel.
(4) Oily waste from vessels.
(5) Solvents, lubricants, paints, and other fuels in the amount used for one day's operations and maintenance.
(b) Flammable liquids must be stored in accordance with NFPA 30 (incorporated by reference, see § 127.003).
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.315 Preliminary transfer inspection.
Before transferring LNG, the person in charge of shoreside transfer operations must—
(a) Inspect the transfer piping and equipment to be used during the transfer and replace any worn or inoperable parts;
(b) For each of the vessel's cargo tanks from which cargo will be transferred, note the pressure, temperature, and volume to ensure they are safe for transfer;
(c) Review and agree with the person in charge of cargo transfer on the vessel to—
(1) The sequence of transfer operations;
(2) The transfer rate;
(3) The duties, location, and watches of each person assigned for transfer operations; and
(4) Emergency procedures from the examined Emergency Manual;
(d) Ensure that transfer connections allow the vessel to move to the limits of its moorings without placing strain on the loading arm or transfer piping system;
(e) Ensure that each part of the transfer system is aligned to allow the flow of LNG to the desired location;
(f) Ensure that warning signs that warn that LNG is being transferred, are displayed;
(g) Eliminate all ignition sources in the marine transfer area for LNG;
(h) Ensure that personnel are on duty in accordance with the examined Operations Manual; and
(i) Test the following to determine that they are operable:
(1) The sensing and alarm systems.
(2) The emergency shutdown system.
(3) The communication systems.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.317 Declaration of inspection.
(a) After the preliminary transfer inspection under § 127.315 has been satisfactorily completed, the person in charge of shoreside transfer operations must ensure that no person transfers LNG until a Declaration of Inspection that meets paragraph (c) of this section is executed and signed in duplicate.
(b) The person in charge of shoreside transfer operations must give one signed copy of the Declaration of Inspection to the person in charge of transfer operations on the vessel, and must retain one signed copy at the waterfront facility handling LNG for 30 days after completion of the transfer.
(c) Each Declaration of Inspection must contain—
(1) The name of the vessel and the waterfront facility handling LNG;
(2) The date and time that transfer operations begin;
(3) A list of the requirements in § 127.315 with the initials of the person in charge of shoreside transfer operations after each requirement, indicating that the requirement is met;
(4) The signature of the person in charge of shoreside transfer operations and the date and time of signing, indicating that he or she is ready to begin transfer operations; and
(5) The signature of each relief person in charge and the date and time of each relief.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.319 LNG transfer.
During LNG transfer operations, the following must be met:
(a) The operator of the waterfront facility handling LNG must ensure that—
(1) The marine transfer area for LNG is under the supervision of a person in charge, who has no other assigned duties during the transfer operation;
(2) Personnel transferring fuel or oily waste are not involved in LNG transfer; and
(3) No vessels are moored outboard of any LNG vessel without the permission of the COTP.
(b) The person in charge of shoreside transfer operations must—
(1) Be in continuous communication with the person in charge of transfer operations on the vessel;
(2) Ensure that an inspection of the transfer piping and equipment for leaks, frost, defects, and other symptoms of safety and operational problems is conducted at least once every transfer;
(3) Ensure that transfer operations are discontinued—
(i) Before electrical storms or uncontrolled fires are adjacent to the marine transfer area for LNG; and
(ii) As soon as a fire is detected; and
(4) Ensure that the lighting systems are turned on between sunset and sunrise.
Note:
Vessel transfer requirements are published in 46 CFR part 154.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.321 Release of LNG.
(a) The operator of the waterfront facility handling LNG must ensure that—
(1) No person releases LNG into the navigable waters of the United States; and
(2) If there is a release of LNG, vessels near the facility are notified of the release by the activation of the warning alarm.
(b) If there is a release of LNG, the person in charge of shoreside transfer operations must—
(1) Immediately notify the person in charge of cargo transfer on the vessel of the intent to shutdown;
(2) Shutdown transfer operations;
(3) Notify the COTP of the release; and
(4) Not resume transfer operations until authorized by the COTP.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
14 Maintenance
§ 127.401 Maintenance: General.
The operator of the waterfront facility handling LNG must ensure that the equipment required under this part is maintained in a safe condition so that it does not cause a release or ignition of LNG.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.403 Inspections.
The operator must conduct a visual inspection for defects of each pressure-relief device not capable of being tested, at least once each calendar year, with intervals between inspections not exceeding 15 months, and make all repairs in accordance with § 127.405.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.405 Repairs.
The operator must ensure that—
(a) Equipment repairs are made so that—
(1) The equipment continues to meet the applicable requirements in this subpart and in NFPA 59A (incorporated by reference, see § 127.003); and
(2) Safety is not compromised; and
(b) Welding is done in accordance with NFPA 51B and Section 10.4.3 of NFPA 59A (both incorporated by reference, see § 127.003).
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.407 Testing.
(a) The operator must pressure test under paragraph (b) of this section the transfer system, including piping, hoses, and loading arms, and verify the set pressure of the safety and relief valves—
(1) After the system or the valves are altered;
(2) After the system or the valves are repaired;
(3) After any increase in the MAWP; or
(4) For those components that are not continuously kept at cryogenic temperature, at least once each calendar year, with intervals between testing not exceeding 15 months.
(b) The pressure for the transfer system test under paragraph (a) of this section must be at 1.1 times the MAWP and be held for a minimum of 30 minutes.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.409 Records.
(a) The operator must keep on file the following information:
(1) A description of the components tested under § 127.407.
(2) The date and results of the test under § 127.407.
(3) A description of any corrective action taken after the test.
(b) The information required by this section must be retained for 24 months.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
15 Personnel Training
§ 127.501 Applicability.
The training required by this subpart must be completed before LNG is transferred.
§ 127.503 Training: General.
The operator shall ensure that each of the following is met:
(a) All full-time employees have training in the following subjects:
(1) Basic LNG firefighting procedures.
(2) LNG properties and hazards.
(b) In addition to the training under paragraph (a) of this section, each person assigned for transfer operations has training in the following subjects:
(1) The examined Operations Manual and examined Emergency Manual.
(2) Advanced LNG firefighting procedures.
(3) Security violations.
(4) LNG vessel design and cargo transfer operations.
(5) LNG release response procedures.
(6) First aid procedures for—
(i) Frostbite;
(ii) Burns;
(iii) Cardio-pulminary resuscitation; and
(iv) Transporting injured personnel.
(c) The personnel who received training under paragraphs (a) and (b) of this section receive refresher training in the same subjects at least once every five years.
16 Firefighting
§ 127.601 Fire equipment: General.
(a) Fire equipment and systems provided in addition to the requirements in this subpart must meet the requirements of this subpart.
(b) The following must be red or some other conspicuous color and be in locations that are readily accessible:
(1) Hydrants and standpipes.
(2) Hose stations.
(3) Portable fire extinguishers.
(4) Fire monitors.
(c) Fire equipment, if applicable, must bear the approval of Underwriters Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard.
§ 127.603 Portable fire extinguishers.
Each marine transfer area for LNG must have—
(a) Portable fire extinguishers that meet Section 16.6.1 of NFPA 59A and Chapter 6 of NFPA 10 (both incorporated by reference, see § 127.003); and
(b) At least one portable fire extinguisher in each designated parking area.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.605 Emergency outfits.
(a) There must be an emergency outfit for each person whose duties include fighting fires, but there must be at least two emergency outfits. Each emergency outfit must include—
(1) One explosion-proof flashlight;
(2) Boots and gloves of rubber or other electrically nonconducting material;
(3) A rigid helmet that protects the head against impact;
(4) Water resistant clothing that also protects the body against fire; and
(5) U.S. Bureau of Mines approved self-contained breathing apparatus.
(b) Emergency outfits under paragraph (a) of this section must be in locations that are readily accessible and marked for easy recognition.
§ 127.607 Fire main systems.
(a) Each marine transfer area for LNG must have a fire main system that provides at least two water streams to each part of the LNG transfer piping and connections, one of which must be from a single length of hose or from a fire monitor.
(b) The fire main must have at least one isolation valve at each branch connection and at least one isolation valve downstream of each branch connection to isolate damaged sections.
(c) The fire main system must have the capacity to supply—
(1) Simultaneously all fire hydrants, standpipes, and fire monitors in the system; and
(2) At a Pitot tube pressure of 618 kilonewtons per square meter (75 p.s.i.), the two outlets having the greatest pressure drop between the source of water and the hose or monitor nozzle, when only those two outlets are open.
(d) If the source of water for the fire main system is capable of supplying a pressure greater than the system's design working pressure, the system must have at least one pressure relief device.
(e) Each fire hydrant or standpipe must have at least one length of hose of sufficient length to meet paragraph (a) of this section.
(f) Each length of hose must—
(1) Be 1 1/2 inches or more in diameter and 30.5 meters (100 feet) or less in length;
(2) Be on a hose rack or reel;
(3) Be connected to the hydrant or standpipe at all times; and
(4) Have a Coast Guard approved combination solid stream and water spray fire hose nozzle.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.609 Dry chemical systems.
(a) Each marine transfer area for LNG must have a dry chemical system that provides at least two dry chemical discharges to the area surrounding the loading arms, one of which must be—
(1) From a monitor; and
(2) Actuated and, except for pre-aimed monitors, controlled from a location other than the monitor location.
(b) The dry chemical system must have the capacity to supply simultaneously or sequentially each hose or monitor in the system for 45 seconds.
(c) Each dry chemical hose station must have at least one length of hose that—
(1) Is on a hose rack or reel; and
(2) Has a nozzle with a valve that starts and stops the flow of dry chemical.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995]
§ 127.611 International shore connection.
The marine transfer area for LNG must have an international shore connection that is in accordance with ASTM F1121-87 (Reapproved 2019) (incorporated by reference, see § 127.003), a 2 1/2 inch fire hydrant, and 2 1/2 inch fire hose of sufficient length to connect the fire hydrant to the international shore connection on the vessel.
[CGD 88-032, 56 FR 35819, July 29, 1991, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2000-7223, 65 FR 40057, June 29, 2000; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.613 Smoking.
In the marine transfer area for LNG, the operator must ensure that no person smokes when there is LNG present.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.615 Fires.
In the marine transfer area for LNG, the operator must ensure that there are no fires when there is LNG present.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.617 Hotwork.
The operator must ensure that no person conducts welding, torch cutting, or other hotwork unless that person has a permit from the COTP.
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
Subpart C Waterfront Facilities Handling Liquefied Hazardous Gas
Source: CGD 88-049, 60 FR 39796, Aug. 3, 1995, unless otherwise noted.
17 Design and Construction
§ 127.1101 Piping systems.
Each piping system within the marine transfer area for LHG used for the transfer of LHG must meet the following criteria:
(a) Each system must be designed and constructed in accordance with ASME B31.3-2020 (incorporated by reference, see § 127.003).
(b) Each pipeline on a pier or wharf must be located so that it is not exposed to physical damage from vehicular traffic or cargo-handling equipment. Each pipeline under navigable waters must be covered or protected to meet 49 CFR 195.248.
(c) The transfer manifold of each liquid transfer line and of each vapor return line must have an isolation valve with a bleed connection, such that transfer hoses and loading arms can be blocked off, drained or pumped out, and depressurized before disconnecting. Bleeds or vents must discharge to a safe area such as a tank or flare.
(d) In addition to the isolation valve at the transfer manifold, each liquid-transfer line and each vapor return line must have a readily accessible isolation valve located near the edge of the marine transfer area for LHG.
(e) Each power-operated isolation valve must be timed to close so that it will not produce a hydraulic shock capable of causing failure of the line or equipment. Unless the layout of the piping allows the isolation valve at the transfer manifold to close within 30 seconds without creating excessive stresses on the system, the layout must be reconfigured to reduce the stresses to a safe level.
(f) Each waterfront facility handling LHG that transfers to or from a vessel requiring vapor return during transfer must be equipped with a vapor return line designed to attach to the vessel's vapor connection.
(g) Where two or more LHGs are loaded or unloaded at the same facility, each manifold must be identified or marked to indicate each LHG it handles.
(h) Each pipeline used to transfer flammable liquids or vapors must be provided with precautions against static, lightning, and stray current in accordance with API RP 2003 (incorporated by reference, see § 127.003).
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1102 Transfer hoses and loading arms.
(a) Each hose within the marine transfer area for LHG used for the transfer of LHG or its vapors to or from a vessel must—
(1) Be made of materials resistant to each LHG transferred, in both the liquid and vapor state (if wire braid is used for reinforcement, the wire must be of corrosion-resistant material, such as stainless steel);
(2) Be constructed to withstand the temperature and pressure foreseeable during transfer, with a MAWP not less than the maximum pressure to which it may be subjected and at least 1030 kPa gauge (149.4 psig);
(3) Be designed for a minimum bursting pressure of a least five times the MAWP;
(4) Have—
(i) Full-threaded connections;
(ii) Flanges that meet ASME B16.5-2020 (incorporated by reference, see § 127.003); or
(iii) Quick connect couplings that are acceptable to the Commandant;
(5) Be adequately supported against the weight of its constituent parts, the LHG, and any ice formed on it;
(6) Have no kinks, bulges, soft spots, or other defects that will let it leak or burst under normal working pressure; and
(7) Have a permanently attached nameplate that indicates, or otherwise be permanently marked to indicate—
(i) Each LHG for which it is suitable;
(ii) Its MAWP at the corresponding service temperature; and
(iii) If used for service at other than ambient temperature, its minimum service temperature.
(b) Each loading arm used for the transfer of LHG or its vapor must—
(1) Be made of materials resistant to each LHG transferred, in both the liquid and vapor state;
(2) Be constructed to withstand the temperature and pressure foreseeable during transfer;
(3) Be adequately supported against the weight of its constituent parts, the LHG, and any ice formed on it;
(4) Be provided with an alarm to indicate when it is approaching the limits of its extension, unless the examined Operations Manual requires a person to perform the same function; and
(5) Have a permanently attached nameplate that indicates, or otherwise be permanently marked to indicate—
(i) Each LHG it may handle;
(ii) Its MAWP at the corresponding service temperature; and,
(iii) If it is used for service at other than ambient temperature, its minimum service temperature.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1103 Piers and wharves.
(a) Each new waterfront facility handling LHG, and all new construction in the marine transfer area for LHG of each facility, must comply with the standards for seismic design and construction in 49 CFR part 41.
(b) Each substructure on a new waterfront facility handling LHG, and all new construction in the marine transfer area for LHG of each facility, except moorings and breasting dolphins, that supports or is within 4.5 meters (14.8 feet) of any pipe or equipment containing a flammable LHG, or that is within 15 meters (49.2 feet) of a loading flange used to transfer a flammable LHG, must have a fire-endurance rating of not less than two hours.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1105 Layout and spacing of marine transfer area for LHG.
Each new waterfront facility handling LHG, and all new construction in the marine transfer area for LHG of each facility, must comply with the following:
(a) Each building, shed, and other structure within each marine transfer area for LHG must be located, constructed, or ventilated to prevent the accumulation of flammable or toxic gases within the structure.
(b) Each impounding space for flammable LHGs located within the area must be designed and located so that the heat flux from a fire over the impounding space does not cause, to a vessel, damage that could prevent the vessel's movement.
(c) Each manifold, loading arm, or independent mating flange must be located at least 60 meters (197 feet) from each of the following structures, if that structure is intended primarily for the use of the general public or of railways:
(1) A bridge crossing a navigable waterway.
(2) The entrance to, or the superstructure of, a tunnel under a navigable waterway.
(d) Each manifold, loading arm, or independent mating flange must be located at least 30 meters (98.5 feet) from each public roadway or railway.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1107 Electrical systems.
Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with, NFPA 70 (incorporated by reference, see § 127.003).
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1109 Lighting systems.
(a) Each waterfront facility handling LHG, at which transfers of LHG take place between sunset and sunrise, must have outdoor lighting that illuminates the marine transfer area for LHG.
(b) All outdoor lighting must be located or shielded so that it cannot be mistaken for any aids to navigation and does not interfere with navigation on the adjacent waterways.
(c) The outdoor lighting must provide a minimum average illumination on a horizontal plane 1 meter (3.3 feet) above the walking surface of the marine transfer area that is—
(1) 54 lux (5 foot-candles) at any loading flange; and
(2) 11 lux (1 foot-candle) for the remainder of the marine transfer area for LHG.
§ 127.1111 Communication systems.
(a) The marine transfer area for LHG must possess a communication system that enables continuous two way voice communication between the person in charge of transfer aboard the vessel and the person in charge of transfer for the facility.
(b) The communication system required by paragraph (a) of this section may consist either of fixed or portable telephones or of portable radios. The system must be usable and effective in all phases of the transfer and all weather at the facility.
(c) Devices used to comply with paragraph (a) of this section during the transfer of a flammable LHG must be listed as intrinsically safe by Underwriters Laboratories, Inc., Factory Mutual Research Corporation, or other independent laboratory recognized by NFPA, for use in the hazardous location in which it is used.
§ 127.1113 Warning signs.
(a) The marine transfer area for LHG must have warning signs that—
(1) Meet paragraph (b) of this section;
(2) Can be seen from the shore and the water; and,
(3) Except as provided in paragraph (c) of this section, bear the following text:
Warning Dangerous Cargo No visitors No Smoking No Open Lights
(b) Each letter on the sign must be—
(1) In block style;
(2) Black on a white background; and
(3) At least 7.6 centimeters (3 inches) high.
(c) The words “No Smoking” and “No Open Lights” may be omitted when the product being transferred is not flammable.
18 Equipment
§ 127.1203 Gas detection.
(a) Each waterfront facility handling LHG that transfers a flammable LHG must have at least two portable gas detectors, or a fixed gas detector, in the marine transfer area for LHG. Each detector must be capable of indicating whether the concentration of flammable vapors exceeds 30% of the Lower Flammable Limit for each flammable product being transferred and must meet IEC 60079-29-1 (incorporated by reference, see § 127.003).
(b) Each waterfront facility handling LHG that transfers a toxic LHG, other than anhydrous ammonia, must have at least two portable gas detectors, or a fixed gas detector, available in the area. The detectors must be capable of showing whether the concentration of each toxic LHG being transferred is above, at, or below any Permissible Exposure Limit listed in 29 CFR 1910.1000, Table Z-1 or Z-2.
(c) Each gas detector required by paragraph (a) or (b) of this section must serve to detect leaks, check structures for gas accumulations, and indicate workers' exposure to toxic gases in the area.
[CGD 88-049, 60 FR 39797, Aug. 3, 1995; 60 FR 49509, Sept. 26, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1205 Emergency shutdown.
(a) Each piping system used to transfer LHG or its vapors to or from a vessel must have a quick-closing shutoff valve to stop the flow of liquid and vapor from the waterfront facility handling LHG if a transfer hose or loading arm fails. This valve may be the isolation valve with a bleed connection required by § 127.1101(c).
(b) The valve required by paragraph (a) of this section must be located as near as practicable to the terminal manifold or loading-arm connection and must—
(1) Close on loss of power;
(2) Close from the time of activation in 30 seconds or less;
(3) Be capable of local manual closing and remotely controlled closing; and,
(4) If the piping system is used to transfer a flammable LHG, either have fusible elements that melt at less than 105 °C (221 °F) and activate the emergency shutdown, or have a sensor that performs the same function.
(c) A remote actuator for each valve must be located in a place accessible in an emergency, at least 15 meters (49.2 feet) from the terminal manifold or loading arm, and conspicuously marked with its designated function. When activated, the actuator must also automatically shut down any terminal pumps or compressors used to transfer LHG, or its vapors, to or from the vessel.
[CGD 88-049, 60 FR 39797, Aug. 3, 1995; 60 FR 49509, Sept. 26, 1995]
§ 127.1207 Warning alarms.
(a) Each marine transfer area for LHG must have a rotating or flashing amber light that is visible for at least 1,600 meters (1 mile) from the transfer connection in all directions.
(b) Each marine transfer area for LHG must also have a siren that is audible for at least 1,600 meters (1 mile) from the transfer connection in all directions.
(c) Each light and siren required by this section must be located so as to minimize obstructions. If any obstruction will prevent any of these alarms from meeting paragraph (a) or (b) of this section, the operator of the waterfront facility handling LHG must propose for approval by the local COTP additional or alternative warning devices that provide an equivalent level of safety.
[CGD 88-049, 60 FR 39798, Aug. 3, 1995; 60 FR 49509, Sept. 26, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1209 Respiratory protection.
Each waterfront facility handling LHG must provide equipment for respiratory protection for each employee of the facility in the marine transfer area for LHG during the transfer of one or more of the following toxic LHGs; anhydrous ammonia, chlorine, dimethylamine, ethylene oxide, methyl bromide, sulphur dioxide, or vinyl chloride. The equipment must protect the wearer from the LHG's vapor for at least 5 minutes.
19 Operations
§ 127.1301 Persons in charge of transfers for the facility: Qualifications and certification.
(a) No person may serve, or use the services of any person, as a person in charge of transfers for the facility regulated under this subpart, unless that person—
(1) Has at least 48 hours' transfer experience with each LHG being transferred;
(2) Knows the hazards of each LHG being transferred;
(3) Knows the rules of this subpart; and
(4) Knows the procedures in the examined Operations Manual and the examined Emergency Manual.
(b) Before a person in charge of transfers for a waterfront facility handling LHG supervises a transfer of LHG, the operator of the facility must certify in writing that that person has met the requirements in paragraph (a) of this section. The operator must ensure that a copy of each current certification is available for inspection at the facility.
[CGD 88-049, 60 FR 39798, Aug. 3, 1995; 60 FR 49509, Sept. 26, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1302 Training.
(a) Each operator of a waterfront facility handling LHG must ensure that each person assigned to act as a person in charge of transfers for the facility has training in the following subjects:
(1) Properties and hazards of each LHG being transferred to or from the facility.
(2) Use of the gas detectors required by § 127.1203.
(3) Use of the equipment for respiratory protection required by § 127.1209.
(4) Basic firefighting procedures, including the use of the portable fire extinguishers required by § 127.1503.
(5) Content and use of the examined Operations Manual and examined Emergency Manual.
(6) The configuration and limitations of cargo systems of LHG vessels.
(7) Procedures for transferring LHG to and from LHG vessels.
(8) Procedures for response to a release of the LHG handled by the facility.
(9) First aid for persons—
(i) With burns;
(ii) Needing cardio-pulmonary resuscitation;
(iii) Exposed to toxic liquid or toxic vapors (if a toxic LHG is handled by the facility); and
(iv) Needing transport to a medical facility.
(10) Restrictions on access to the marine transfer area for LHG.
(b) Each person that receives training under paragraph (a) of this section shall receive refresher training in the same subjects at least once every 5 years.
(c) The operator must maintain, for each person trained, a record of all training provided under paragraphs (a) and (b) of this section. The operator must retain these records for the duration of the person's employment on the waterfront facility plus 12 months.
(d) Training conducted to comply with the hazard communication programs required by the Occupational Safety and Health Administration (OSHA) of the Department of Labor [29 CFR 1910.120] or the Environmental Protection Agency (EPA) [40 CFR 311.1] may be used to satisfy the requirements in paragraph (a) of this section, so far as the training addresses the requirements in paragraph (a) of this section.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1303 Compliance with suspension order.
If the COTP issues to the owner or operator of a waterfront facility handling LHG an order to suspend a transfer, no transfer may take place at the facility until the COTP withdraws the order.
§ 127.1305 Operations Manual.
Each Operations Manual must contain—
(a) A description of each liquid-transfer system and vapor transfer system, including each mooring area, transfer connection, and (where installed) control room, and a diagram of the piping and electrical systems;
(b) The duties of each person assigned to transfers;
(c) The maximum relief-valve setting or MAWP of the transfer system;
(d) The telephone numbers of supervisors, persons in charge of transfers for the facility, persons on watch in the marine transfer area for LHG, and security personnel of the facility;
(e) A description for each security system provided for the transfer area;
(f) A description of the training programs established under § 127.1302;
(g) The procedures to follow for security violations; and
(h) For each LHG handled, the procedures for transfer that include—
(1) Requirements for each aspect of the transfer (start-up, gauging, cooldown, pumping, venting, and shutdown);
(2) The maximum transfer rate;
(3) The minimum transfer temperature;
(4) Requirements for firefighting equipment; and
(5) Communication procedures.
§ 127.1307 Emergency Manual.
(a) Each Emergency Manual must contain—
(1) For each LHG handled—
(i) A physical description of the LHG;
(ii) A description of the hazards of the LHG;
(iii) First-aid procedures for persons exposed to the LHG or its vapors;
(iv) The procedures for response to a release of the LHG; and,
(v) If the LHG is flammable, the procedures for fighting a fire involving the LHG or its vapors;
(2) A description of the emergency shutdown required by § 127.1205;
(3) The procedures for emergency shutdown;
(4) A description of the number, kind, place, and use of the fire equipment required by § 127.1501(a) and of the portable fire extinguishers required by § 127.1503;
(5) The telephone numbers of local Coast Guard units, hospitals, fire departments, police departments, and other emergency-response organizations;
(6) If the facility has personnel shelters, the place of and provisions in each shelter;
(7) If the facility has first-aid stations, the location of each station;
(8) Emergency procedures for mooring and unmooring a vessel; and,
(9) If an off-site organization is to furnish emergency response, a copy of the written agreement required by § 127.1505(a)(2).
(b) The employee-emergency plan and fire-prevention plan required by OSHA in 29 CFR 1910.38 may be used to comply with this section to the extent that they address the requirements specified in paragraphs (a) (1) through (9) of this section.
[CGD 88-049, 60 FR 39799, Aug. 3, 1995; 60 FR 49509, Sept. 26, 1995]
§ 127.1309 Operations Manual and Emergency Manual: Use.
The operator must ensure that—
(a) LHG transfer operations are not conducted unless the person in charge of transfer for the waterfront facility handling LHG has a printed or electronic copy of the most recently examined Operations Manual and Emergency Manual readily available in the marine transfer area. Electronic devices used to display the manuals must comply with applicable electrical safety standards in this part;
(b) Each transfer is conducted in accordance with the examined Operations Manual; and
(c) Each emergency response is conducted in accordance with the examined Emergency Manual.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2020-315, 86 FR 43940, Aug. 11, 2021]
§ 127.1311 Motor vehicles.
(a) When LHG is being transferred or stored in the marine transfer area of a waterfront facility handling LHG, the operator must ensure that no person—
(1) Stops or parks a motor vehicle in a space other than a designated parking space;
(2) Refuels a motor vehicle within the area; or
(3) Operates a vehicle or other mobile equipment that constitutes a potential source of ignition within 15 meters (49.2 feet) of any storage container, manifold, loading arm, or independent mating flange containing a flammable liquid or vapor.
(b) If motor vehicles are permitted to stop in the marine transfer area for LHG, the operator shall designate and mark parking spaces that—
(1) Do not block fire lanes;
(2) Do not impede any entrances or exits; and
(3) Are not located within 15 meters (49.2 feet) of any storage container, manifold, loading arm, or independent mating flange containing a flammable liquid or vapor.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1313 Storage of hazardous materials.
(a) Each operator of a waterfront facility handling LHG must ensure that no materials listed in the table of hazardous materials under 49 CFR 172.101, except for the following, are stored in the marine transfer area for LHG:
(1) The LHG being transferred.
(2) Fuel required by the vessel, or by emergency equipment in the area.
(3) Oily wastes received from vessels.
(4) Solvents, lubricants, paints and similar materials in the amount required for one day's operations and maintenance.
(b) The operator must ensure that flammable liquids not stored in bulk are stored in accordance with NFPA 30 (incorporated by reference, see § 127.003).
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1315 Preliminary transfer inspection.
Before each transfer, the person in charge of transfer for the facility must—
(a) Inspect piping and equipment within the marine transfer area for LHG to be used for transfer and ensure that it meets the requirements in this part;
(b) Determine the contents, pressure, temperature, and capacity of each storage tank to or from which LHG will be transferred, to ensure that it is safe for transfer;
(c) Confer with the person in charge of transfer aboard the vessel, to review and agree on—
(1) The sequence of acts required for transfer;
(2) The rate, maximum working pressure, and minimum working temperature of transfer;
(3) The duties, stations, and watches of each person assigned for transfer; and
(4) The emergency procedures in the examined Emergency Manual;
(d) Ensure that the vessel is securely moored and that the transfer connections allow it to move to the limits of its moorings without placing a strain on the piping, hose, or loading arm used for transfer;
(e) Ensure that each part of the transfer system is aligned to allow the flow of LHG to the desired place;
(f) Ensure the display of the warning signs required by § 127.1113;
(g) Ensure that the requirements of this part concerning smoking and fire protection are met;
(h) Ensure that qualified personnel are on duty in accordance with the examined Operations Manual and §§ 127.1301 and 127.1302; and
(i) Test the following to determine that they are operable:
(1) The communication system required by § 127.1111.
(2) The gas detectors required by § 127.1203.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1317 Declaration of Inspection.
(a) Each person in charge of transfer for the facility must ensure that no person transfers LHG to or from a vessel until a Declaration of Inspection that meets paragraph (c) of this section is executed and signed by both the person in charge aboard the vessel and the person in charge for the facility.
(b) No person in charge of transfer for the facility may sign the Declaration unless that person has fulfilled the requirements of § 127.1315 and has indicated fulfillment of each requirement by writing his or her initials in the appropriate space on the Declaration.
(c) Each Declaration must contain—
(1) The name of the vessel and that of the facility;
(2) The date and time that the transfer begins;
(3) A list of the requirements in § 127.1315 with the initials of both the person in charge aboard the vessel and the person in charge for the facility after each requirement, indicating the fulfillment of the requirement;
(4) The signatures of both the person in charge aboard the vessel and the person in charge for the facility, and the date and time of signing, indicating that they are both ready to begin transfer; and
(5) The signature of each relief person in charge and the date and time of each relief.
(d) The person in charge of transfer for the facility must give one signed copy of the Declaration to the person in charge of transfer aboard the vessel and retain the other.
(e) Each operator of a facility must retain a signed copy of the Declaration at the facility for 30 days after the transfer.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1319 Transfer of LHG.
(a) The operator of a waterfront facility handling LHG must notify the COTP of the time and place of each transfer of LHG in bulk at least 4 hours before it begins.
(b) During transfer, each operator of a waterfront facility handling LHG must ensure that—
(1) The marine transfer area for LHG is under the supervision of a person in charge certified for transfers of LHG, who has no other assigned duties during the transfer;
(2) The person in charge supervises transfers only to or from one vessel at a time unless authorized by the COTP.
(3) No person transferring fuel or oily waste is involved in the transfer; and
(4) No vessel is moored outboard of any LHG vessel unless allowed by the COTP or the examined Operations Manual of the facility.
(c) During transfer, each person in charge of transfer for the facility must—
(1) Maintain communication with the person in charge of transfer aboard the LHG vessel;
(2) Ensure that an inspection of the transfer piping and equipment for leaks, frost, defects, and other threats to safety takes place at least once every transfer;
(3) Ensure that—
(i) Transfer of LHG is discontinued as soon as a release or fire is detected in the area or aboard the vessel; and
(ii) Transfer of flammable LHG is discontinued when electrical storms or uncontrolled fires approach near the area; and
(4) Ensure that the outdoor lighting required by § 127.1109 is turned on between sunset and sunrise.
(d) Upon completion of transfer of LHG, each operator of a waterfront facility handling LHG must ensure that hoses and loading arms used for transfer are drained of LHG residue and depressurized before disconnecting from the vessel.
Note to § 127.1319:
Corresponding standards for vessels appear at 46 CFR part 154.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1321 Release of LHG.
(a) Each operator of a waterfront facility handling LHG must ensure that—
(1) No person intentionally releases LHG into the environment; and
(2) If a release of LHG or its vapor threatens vessels or persons outside the marine transfer area for LHG, they are notified by the warning devices.
(b) If LHG or its vapor is released, the person in charge of transfer for the facility must—
(1) Immediately notify the person in charge of transfer aboard the vessel that transfer must be shut down;
(2) Shut down transfer in coordination with the person aboard the vessel;
(3) Notify the COTP of the release; and
(4) Not resume transfer until authorized by the COTP.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1325 Access to marine transfer area for LHG.
Each operator of a waterfront facility handling LHG must ensure that—
(a) Access to the marine transfer area for LHG from shoreside and waterside is limited to—
(1) Personnel who work in the area, transfer personnel, vessel personnel, and delivery and service personnel in the course of their business;
(2) Federal, State, and local officials; and
(3) Other persons authorized by the operator;
(b) Each person allowed into the area is positively identified as someone authorized to enter and that each person other than an employee of the facility displays an identifying badge;
(c) Guards are stationed, and fences or other devices are installed, to prevent, detect, and respond to unauthorized access, fires, and releases of LHG in the area, except that alternative measures approved by the COTP (such as electronic monitoring or random patrols) will be sufficient where the stationing of guards is impracticable; and
(d) Coast Guard personnel are allowed access to the facility, at any time, to make any examination or to board any vessel moored at the facility.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
20 Maintenance
§ 127.1401 General.
Each operator of a waterfront facility handling LHG must ensure that all cargo handling equipment is operable, and that no equipment that may cause the release or ignition of LHG is used in the marine transfer area for LHG.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1403 Inspections.
(a) Each operator of a waterfront facility handling LHG must conduct a visual inspection for defects of each pressure relief device not capable of being tested.
(b) The operator must conduct the inspection required by paragraph (a) of this section at least once each calendar year, with intervals between inspections not exceeding 15 months.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1405 Repairs.
Each operator of a waterfront facility handling LHG must ensure that—
(a) Equipment is repaired so that—
(1) The equipment continues to meet the applicable requirements in this subpart;
(2) Safety is not compromised; and
(b) Welding and cutting meet NFPA 51B (incorporated by reference, see § 127.003).
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
§ 127.1407 Tests.
(a) Each operator of a waterfront facility handling LHG must conduct a static liquid-pressure test of the piping, hoses, and loading arms of the LHG-transfer system located in the marine transfer area for LHG, and must verify the set pressure of the safety and relief valves—
(1) After the system or the valves are altered;
(2) After major repairs to the system or the valves;
(3) After any increase in the MAWP of the system; and
(4) At least once each calendar year, with intervals between tests not exceeding 15 months.
(b) The pressure for the test under paragraph (a) of this section must be at least 1.1 times the MAWP and last for at least 30 minutes.
(c) The operator must conduct a test of each pressure gauge, to ensure that the displayed pressure is within 10 percent of the actual pressure, at least once each calendar year, with intervals between tests not exceeding 15 months.
(d) The operator must conduct a test of each item of remote operating or indicating equipment, such as a remotely operated valve, at least once each calendar year, with intervals between tests not exceeding 15 months.
(e) The operator must conduct a test of the emergency shutdown required by § 127.1205 at least once every two months, to ensure that it will perform as intended. If transfers of LHG occur less often than every two months, the operator may conduct this test before each transfer instead of every two months.
(f) The operator must conduct a test of the warning alarm required by § 127.1207 at least once every six months, to ensure that it will perform as intended. If transfers of LHG occur less often than every six months, the operator may conduct this test before each transfer instead of every six months.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
§ 127.1409 Records.
(a) Each operator of a waterfront facility handling LHG must keep on file:
(1) A description of the components inspected or tested under § 127.1403 or 127.1407.
(2) The date and results of each inspection or test under § 127.1403 or 127.1407.
(3) A description of any repair made after the inspection or test.
(4) The date and a description of each alteration or major repair to the LHG transfer system or its valves.
(b) The operator must keep this information on file for at least 24 months after the inspection, test, alteration, or major repair.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
21 Firefighting Equipment
§ 127.1501 General.
(a) The number, kind, and place of equipment for fire detection, protection, control, and extinguishment must be determined by an evaluation based upon sound principles of fire-protection engineering, analysis of local conditions, hazards within the waterfront facility handling LHG, and exposure to other property. A description of the number, kind, place, and use of fire equipment determined by this evaluation must appear in the Emergency Manual for each facility. The evaluation for each new facility and for all new construction on each facility must be submitted to the COTP for review when the emergency manual is submitted under § 127.1307.
(b) All fire equipment for each facility must be adequately maintained, and periodically inspected and tested, so it will perform as intended.
(c) The following must be red or some other conspicuous color and be in places that are readily accessible:
(1) Hydrants and standpipes.
(2) Hose stations.
(3) Portable fire extinguishers.
(4) Fire monitors.
(d) Fire equipment must bear the approval, if applicable, of Underwriters Laboratories, Inc., Factory Mutual Research Corporation, or other independent laboratory recognized by NFPA.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-1999-5832, 64 FR 34714, June 29, 1999; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]
§ 127.1503 Portable fire extinguishers.
Each operator of a waterfront facility handling LHG must provide portable fire extinguishers of appropriate, number, size, and kind in the marine transfer area for LHG in accordance with NFPA 10 (incorporated by reference, see § 127.003).
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
§ 127.1505 Emergency response and rescue.
(a) Each waterfront facility handling LHG must arrange for emergency response and rescue pending the arrival of resources for firefighting or pollution control. Response and rescue may be performed by facility personnel or by an off-site organization.
(1) If response and rescue are performed by facility personnel, appropriate training and equipment for personnel protection must be furnished to those personnel. Training and equipment that meets 29 CFR 1910.120, hazardous-waste operations and emergency response, will be appropriate.
(2) If response and rescue are performed by an off-site organization, the organization must enter into a written agreement with the facility indicating the services it will perform and the time within which it will perform them to injured or trapped personnel.
(b) [Reserved]
§ 127.1507 Water systems for fire protection.
(a) Each waterfront facility handling LHG must have a supply of water and a means for distributing and applying the water to protect personnel; to cool storage tanks, equipment, piping, and vessels; and to control unignited leaks and spills in the marine transfer area for LHG except when the evaluation required by § 127.1501(a) indicates otherwise. The evaluation must address fire protection for structures, cargo, and vessels. Each water system must include on the pier or wharf at least one 2 1/2-inch supply line, one 2 1/2-inch fire hydrant, and enough 2 1/2-inch hose to connect the hydrant to the vessel.
(b) Each water system must fully and simultaneously supply, for at least 2 hours, all fixed fire-protection systems, including monitor nozzles, at their designed flow and pressure for the worst single incident foreseeable, plus 63 L/s (1000 gpm) for streams from hand-held hoses.
§ 127.1509 Equipment for controlling and extinguishing fires.
(a) Within each marine transfer area for LHG of each waterfront facility handling LHG that transfers a flammable LHG, portable or wheeled fire extinguishers suitable for gas fires, preferably dry chemical extinguishers, must be available at strategic sites, as determined by the evaluation required by § 127.1501(a).
(b) Fixed systems for extinguishing or controlling fires may be appropriate for protection against particular hazards. The evaluation required by § 127.1501(a) may specify the use of one or more of the following fixed systems:
(1) Low-, medium-, or high-expansion foam.
(2) Dry chemicals.
(3) Water applied as deluge, spray, or sprinkle.
(4) Carbon dioxide.
(5) Other NFPA approved fire extinguishing media.
§ 127.1511 International shore connection.
Each marine transfer area for LHG that receives foreign flag vessels must have an international shore connection meeting the requirements of ASTM F1121-87 (Reapproved 2019) (incorporated by reference, see § 127.003).
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2000-7223, 65 FR 40057, June 29, 2000; USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
22 Fire Protection
§ 127.1601 Smoking.
Each operator of a waterfront facility handling LHG must ensure that no person smokes in the marine transfer area for LHG unless—
(a) Neither flammable LHG nor its vapors are present in the area; and
(b) The person is in a place designated and marked in accordance with local law.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
§ 127.1603 Hotwork.
Each operator of a waterfront facility handling LHG must ensure that no person conducts welding, torch cutting, or other hotwork on the facility, or on a vessel moored to the facility, unless—
(a) The COTP has issued a permit for that hotwork; and
(b) The conditions of the permit are met.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
§ 127.1605 Other sources of ignition.
Each operator of a waterfront facility handling LHG must ensure that in the marine transfer area for LHG—
(a) There are no open fires or open flame lamps;
(b) Heating equipment will not ignite combustible material;
(c) Each chimney and appliance has a spark arrestor if it uses solid fuel or is located where sparks may ignite combustible material; and
(d) All rubbish, debris, and waste go into appropriate receptacles.
[CGD 88-049, 60 FR 39796, Aug. 3, 1995, as amended by CGD 97-023, 62 FR 33363, June 19, 1997; USCG-2019-0444, 87 FR 5692, Feb. 2, 2022]
128 PART 128 [RESERVED]
SUBCHAPTER M MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION
PART 136 OIL SPILL LIABILITY TRUST FUND; CLAIMS PROCEDURES; DESIGNATION OF SOURCE; AND ADVERTISEMENT
Authority: 33 U.S.C. 2713(e) and 2714; Sec. 1512 of the Homeland Security Act of 2002, Pub. L. 107-296, Title XV, Nov. 25, 2002, 116 Stat. 2310 (6 U.S.C. 552(d)); E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351, as amended by E.O. 13286, 68 FR 10619, 3 CFR, 2004 Comp., p.166; Department of Homeland Security Delegation No. 0170.1, para. 2(80).
Source: CGD 91-035, 57 FR 36316, Aug. 12, 1992, unless otherwise noted.
Subpart A General
§ 136.1 Purpose and applicability.
(a) This part prescribes regulations for—
(1) Presentation, filing, processing, settlement, and adjudication of claims authorized to be presented to the Oil Spill Liability Trust Fund (the Fund) under section 1013 of the Oil Pollution Act of 1990 (the Act) (33 U.S.C. 2713) for certain uncompensated removal costs or uncompensated damages resulting from the discharge, or substantial threat of discharge, of oil from a vessel or facility into or upon the navigable waters, adjoining shorelines, or the exclusive economic zone;
(2) Designation of the source of the incident, notification to the responsible party of the designation, and advertisement of the designation and claims procedures; and
(3) Other related matters.
(b) This part applies to claims resulting from incidents occurring after August 18, 1990.
(c) Nothing in this part—
(1) Preempts the authority of any State or political subdivision thereof from imposing any additional liability or requirements with respect to—
(i) The discharge of oil or other pollution by oil within such State; or
(ii) Any removal activities in connection with such a discharge; or
(2) Affects or modifies in any way the obligations or liabilities of any person under the Solid Waste Disposal Act (42 U.S.C. 6901 et seq.) or State law, including common law; or
(3) Affects the authority of any State—
(i) To establish, or to continue in effect, a fund any purpose of which is to pay for costs or damages arising out of, or directly resulting from, oil pollution or the substantial threat of oil pollution; or
(ii) To require any person to contribute to such a fund; or
(4) Affects the authority of the United States or any State or political subdivision thereof to impose additional liability or additional requirements relating to a discharge, or substantial threat of a discharge, of oil.
§ 136.3 Information.
Anyone desiring to file a claim against the Fund may obtain general information on the procedure for filing a claim from the Director, National Pollution Funds Center, U.S. Coast Guard Stop 7605, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7605, (800) 280-7118.
[CGD 91-035, 57 FR 36316, Aug. 12, 1992, as amended by USCG-2009-0416, 74 FR 27441, June 10, 2009; USCG-2012-0306, 77 FR 37315, June 21, 2012; USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 136.5 Definitions.
(a) As used in this part, the following terms have the same meaning as set forth in sections 1001 and 1007(c) of the Act (33 U.S.C. 2701 and 2707(c)): Claim, claimant, damages, discharge, exclusive economic zone, facility, foreign claimant, foreign offshore unit, Fund, guarantor, incident, National Contingency Plan, natural resources, navigable waters, offshore facility, oil, onshore facility, owner or operator, person, removal costs, responsible party, State, United States, and vessel.
(b) As used in this part—
Act means title I of the Oil Pollution Act of 1990 (Pub. L. 101-380; 33 U.S.C. 2701 through 2719).
Director, NPFC, means the person in charge of the U.S. Coast Guard National Pollution Funds Center or that person's authorized representative.
FOSC means the Federal On-Scene Coordinator designated under the National Contingency Plan or that person's authorized representative.
NPFC means the Director, National Pollution Funds Center, U.S. Coast Guard Stop 7605, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7605.
[CGD 91-035, 57 FR 36316, Aug. 12, 1992, as amended by USCG-2009-0416, 74 FR 27441, June 10, 2009; USCG-2012-0306, 77 FR 37315, June 21, 2012; USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 136.7 Foreign claimants.
In addition to other applicable limitations on presenting claims to the Fund, claims by foreign claimants to recover removal costs or damages may be presented only when the requirements of section 1007 of the Act (33 U.S.C. 2707) are met.
§ 136.9 Falsification of claims.
Persons submitting false claims or making false statements in connection with claims under this part may be subject to prosecution under Federal law, including but not limited to 18 U.S.C. 287 and 1001. In addition, persons submitting written documentation in support of claims under this part which they know, or should know, is false or omits a material fact may be subject to a civil penalty for each claim. If any payment is made on the claim, the claimant may also be subject to an assessment of up to twice the amount claimed. These civil sanctions may be imposed under the Program Fraud Civil Remedies Act, 31 U.S.C. 3801-3812, as implemented in 6 CFR part 13.
[CGD 91-035, 57 FR 36316, Aug. 12, 1992, as amended by CGD 96-052, 62 FR 16703, Apr. 8, 1997; USCG-2013-0397, 78 FR 39175, July 1, 2013]
Subpart B General Procedure
§ 136.101 Time limitations on claims.
(a) Except as provided under section 1012(h)(3) of the Act (33 U.S.C. 2712(h)(3)) (minors and incompetents), the Fund will consider a claim only if presented in writing to the Director, NPFC, within the following time limits:
(1) For damages, within three years after—
(i) The date on which the injury and its connection with the incident in question were reasonably discoverable with the exercise of due care.
(ii) In the case of natural resources damages under section 1002(b)(2)(A) of the Act (33 U.S.C. 2702(b)(2)(A)), the date under paragraph (a)(1)(i) of this section, or within three years from the date of completion of the natural resources damage assessment under section 1006(e) of the Act (33 U.S.C. 2706(e)), whichever is later.
(2) For removal costs, within six years after the date of completion of all removal actions for the incident. As used in this paragraph, “date of completion of all removal actions” is defined as the actual date of completion of all removal actions for the incident or the date the FOSC determines that the removal actions which form the basis for the costs being claimed are completed, whichever is earlier.
(b) Unless the Director, NPFC, directs in writing that the claim be submitted elsewhere, a claim is deemed presented on the date the claim is actually received at the Director, National Pollution Funds Center, U.S. Coast Guard Stop 7605, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7605. If the Director, NPFC, directs that the claim be presented elsewhere, the claim is deemed presented on the date the claim is actually received at the address in the directive.
[CGD 91-035, 57 FR 36316, Aug. 12, 1992; 57 FR 41104, Sept. 9, 1992, as amended by USCG-2009-0416, 74 FR 27441, June 10, 2009; USCG-2012-0306, 77 FR 37315, June 21, 2012; USCG-2016-0498, 82 FR 35081, July 28, 2017]
§ 136.103 Order of presentment.
(a) Except as provided in paragraph (b) of this section, all claims for removal costs or damages must be presented first to the responsible party or guarantor of the source designated under § 136.305.
(b) Claims for removal costs or damages may be presented first to the Fund only—
(1) By any claimant, if the Director, NPFC, has advertised, or otherwise notified claimants in writing, in accordance with § 136.309(e);
(2) By a responsible party who may assert a claim under section 1008 of the Act (33 U.S.C. 2708);
(3) By the Governor of a State for removal costs incurred by that State; or
(4) By a United States claimant in a case where a foreign offshore unit has discharged oil causing damage for which the Fund is liable under section 1012(a) of the Act (33 U.S.C. 2712(a)).
(c) If a claim is presented in accordance with paragraph (a) of this section and—
(1) Each person to whom the claim is presented denies all liability for the claim; or
(2) The claim is not settled by any person by payment within 90 days after the date upon which (A) the claim was presented, or (B) advertising was begun pursuant to § 136.309(d), whichever is later, the claimant may elect to commence an action in court against the responsible party or guarantor or to present the claim to the Fund.
(d) No claim of a person against the Fund will be approved or certified for payment during the pendency of an action by the person in court to recover costs which are the subject of the claim.
[CGD 91-035, 57 FR 36316, Aug. 12, 1992; 57 FR 41104, Sept. 9, 1992]
§ 136.105 General requirements for a claim.
(a) The claimant bears the burden of providing all evidence, information, and documentation deemed necessary by the Director, NPFC, to support the claim.
(b) Each claim must be in writing for a sum certain for compensation for each category of uncompensated damages or removal costs (as described in Subpart C of this part) resulting from an incident. If at any time during the pendency of a claim against the Fund the claimant receives any compensation for the claimed amounts, the claimant shall immediately amend the claim.
(c) Each claim must be signed in ink by the claimant certifying to the best of the claimant's knowledge and belief that the claim accurately reflects all material facts.
(d) In addition to the other requirements of this section, any claim presented by a legal representative of the claimant must also be signed by the legal representative and—
(1) Be presented in the name of the claimant;
(2) Show the title or legal capacity of the representative; and
(3) Provide proof of authority to act for the claimant.
(e) Each claim must include at least the following, as applicable:
(1) The full name, street and mailing addresses of residence and business, and telephone numbers of the claimant.
(2) The date, time, and place of the incident giving rise to the claim.
(3) The identity of the vessel, facility, or other entity causing or suspected to have caused the removal costs or damages claimed and the basis for such identity or belief.
(4) A general description of the nature and extent of the impact of the incident, the costs associated with removal actions, and damages claimed, by category as delineated in Subpart C of this part, including, for any property, equipment, or similar item damaged, the full name, street and mailing address, and telephone number of the actual owner, if other than the claimant.
(5) An explanation of how and when the removal costs or damages were caused by, or resulted from, an incident.
(6) Evidence to support the claim.
(7) A description of the actions taken by the claimant, or other person on the claimant's behalf, to avoid or minimize removal costs or damages claimed.
(8) The reasonable costs incurred by the claimant in assessing the damages claimed. This includes the reasonable costs of estimating the damages claimed, but not attorney's fees or other administrative costs associated with preparation of the claim.
(9) To the extent known or reasonably identifiable by the claimant, the full name, street and mailing address, and telephone number of each witness to the incident, to the discharge, or to the removal costs or damages claimed, along with a brief description of that person's knowledge.
(10) A copy of written communications and the substance of verbal communications, if any, between the claimant and the responsible party or guarantor of the source designated under § 136.305 and a statement indicating that the claim was presented to the responsible party or guarantor, the date it was presented, that it was denied or remains not settled and, if known, the reason why it was denied or remains not settled.
(11) If the claimant has insurance which may cover the removal costs or damages claimed, the information required under § 136.111.
(12) A statement by the claimant that no action has been commenced in court against the responsible party or guarantor of the source designated under § 136.305 or, if an action has been commenced, a statement identifying the claimant's attorney and the attorney's address and phone number, the civil action number, and the court in which the action is pending.
(13) In the discretion of the Director, NPFC, any other information deemed relevant and necessary to properly process the claim for payment.
§ 136.107 Subrogated claims.
(a) The claims of subrogor (e.g., insured) and subrogee (e.g., insurer) for removal costs and damages arising out of the same incident should be presented together and must be signed by all claimants.
(b) A fully subrogated claim is payable only to the subrogee.
(c) A subrogee must support a claim in the same manner as any other claimant.
§ 136.109 Removal costs and multiple items of damages.
(a) A claimant must specify all of the claimant's known removal costs or damages arising out of a single incident when submitting a claim.
(b) Removal costs and each separate category of damages (as described in subpart C of this part) must be separately listed with a sum certain attributed to each type and category listed.
(c) At the sole discretion of the Director, NPFC, removal costs and each separate category of damages may be treated separately for settlement purposes.
§ 136.111 Insurance.
(a) A claimant shall provide the following information concerning any insurance which may cover the removal costs or damages for which compensation is claimed:
(1) The name and address of each insurer.
(2) The kind and amount of coverage.
(3) The policy number.
(4) Whether a claim has been or will be presented to an insurer and, if so, the amount of the claim and the name of the insurer.
(5) Whether any insurer has paid the claim in full or in part or has indicated whether or not payment will be made.
(b) If requested by the Director, NPFC, the claimant shall provide a copy of the following material:
(1) All insurance policies or indemnification agreements.
(2) All written communications, and a summary of all oral communications, with any insurer or indemnifier.
(c) A claimant shall advise the Director, NPFC, of any changes in the information provided under this section.
§ 136.113 Other compensation.
A claimant must include an accounting, including the source and value, of all other compensation received, applied for, or potentially available as a consequence of the incident out of which the claim arises including, but not limited to, monetary payments, goods or services, or other benefits.
§ 136.115 Settlement and notice to claimant.
(a) Payment in full, or acceptance by the claimant of an offer of settlement by the Fund, is final and conclusive for all purposes and, upon payment, constitutes a release of the Fund for the claim. In addition, acceptance of any compensation from the Fund precludes the claimant from filing any subsequent action against any person to recover costs or damages which are the subject of the compensated claim. Acceptance of any compensation also constitutes an agreement by the claimant to assign to the Fund any rights, claims, and causes of action the claimant has against any person for the costs and damages which are the subject of the compensated claims and to cooperate reasonably with the Fund in any claim or action by the Fund against any person to recover the amounts paid by the Fund. The cooperation shall include, but is not limited to, immediately reimbursing the Fund for any compensation received from any other source for the same costs and damages and providing any documentation, evidence, testimony, and other support, as may be necessary for the Fund to recover from any person.
(b) Claimant's failure to accept an offer of settlement within 60 days after the date the offer was mailed to the claimant automatically voids the offer. The Director, NPFC, reserves the right to revoke an offer at any time.
(c) A claimant will be notified in writing sent by certified or registered mail whenever a claim against the Fund is denied. The failure of the Director, NPFC, to make final disposition of a claim within six months after it is filed shall, at the option of the claimant any time thereafter, be deemed a final denial of the claim.
(d) The Director, NPFC, upon written request of the claimant or of a person duly authorized to act on the claimant's behalf, reconsiders any claim denied. The request for reconsideration must be in writing and include the factual or legal grounds for the relief requested, providing any additional support for the claim. The request must be received by the Director, NPFC, within 60 days after the date the denial was mailed to the claimant or within 30 days after receipt of the denial by the claimant, whichever date is earlier. Reconsideration may only be requested once for each claim denied. The Director, NPFC will provide the claimant seeking reconsideration with written notification of the decision within 90 days after receipt of the request for reconsideration. This written decision is final. The failure of the Director, NPFC, to make final disposition of a reconsideration within 90 days after it is received shall, at the option of the claimant any time thereafter, be deemed a final denial of the reconsideration.
Subpart C Procedures for Particular Claims
§ 136.201 Authorized claimants.
A claim for removal costs may be presented by any claimant.
§ 136.203 Proof.
In addition to the requirements of Subparts A and B of this part, a claimant must establish—
(a) That the actions taken were necessary to prevent, minimize, or mitigate the effects of the incident;
(b) That the removal costs were incurred as a result of these actions;
(c) That the actions taken were determined by the FOSC to be consistent with the National Contingency Plan or were directed by the FOSC.
§ 136.205 Compensation allowable.
The amount of compensation allowable is the total of uncompensated reasonable removal costs of actions taken that were determined by the FOSC to be consistent with the National Contingency Plan or were directed by the FOSC. Except in exceptional circumstances, removal activities for which costs are being claimed must have been coordinated with the FOSC.
Natural Resources
§ 136.207 Authorized claimants.
(a) Claims for uncompensated natural resource damages may be presented by an appropriate natural resources trustee. However, in order to facilitate the processing of these claims with respect to a single incident where multiple trustees are involved and to prevent double recovery, the affected trustees should select a lead administrative trustee who will present consolidated claims on behalf of the trustees.
(b) A trustee may present a claim for the reasonable cost of assessing natural resources damages separately from a claim for the cost of developing and implementing plans for the restoration, rehabilitation, replacement, or acquisition of the equivalent of the natural resources damaged.
§ 136.209 Proof.
In addition to the requirements of subparts A and B of this part, a trustee must do the following:
(a) Submit the assessment and restoration plans which form the basis of the claim.
(b) Provide documented costs and cost estimates for the claim. Final cost estimates for conducting damage assessments or implementing a restoration plan may form the basis for a claim against the Fund for an uncompensated natural resources damage claim.
(c) Identify all trustees who may be potential claimants for the same natural resources damaged.
(d) Certify the accuracy and integrity of any claim submitted to the Fund, and certify that any actions taken or proposed were or will be conducted in accordance with the Act and consistent with all applicable laws and regulations.
(e) Certify whether the assessment was conducted in accordance with applicable provisions of the natural resources damage assessment regulations promulgated under section 1006(e)(1) of the Act (33 U.S.C. 2706(e)(1)). Identify any other or additional damage assessment regulations or methodology utilized.
(f) Certify that, to the best of the trustee's knowledge and belief, no other trustee has the right to present a claim for the same natural resources damages and that payment of any subpart of the claim presented would not constitute a double recovery for the same natural resources damages.
§ 136.211 Compensation allowable.
(a) The amount of compensation allowable is the reasonable cost of assessing damages, and the cost of restoring, rehabilitating, replacing, or acquiring the equivalent of the damaged natural resources.
(b) In addition to any other provision of law respecting the use of sums recovered for natural resources damages, trustees shall reimburse the Fund for any amounts received from the Fund in excess of that amount required to accomplish the activities for which the claim was paid.
Real or Personal Property
§ 136.213 Authorized claimants.
(a) A claim for injury to, or economic losses resulting from the destruction of, real or personal property may be presented only by a claimant either owning or leasing the property.
(b) Any claim for loss of profits or impairment of earning capacity due to injury to, destruction of, or loss of real or personal property must be included as subpart of the claim under this section and must include the proof required under § 136.233.
§ 136.215 Proof.
(a) In addition to the requirements of subparts A and B of this part, a claimant must establish—
(1) An ownership or leasehold interest in the property;
(2) That the property was injured or destroyed;
(3) The cost of repair or replacement; and
(4) The value of the property both before and after injury occurred.
(b) In addition, for each claim for economic loss resulting from destruction of real or personal property, the claimant must establish—
(1) That the property was not available for use and, if it had been, the value of that use;
(2) Whether or not substitute property was available and, if used, the costs thereof; and
(3) That the economic loss claimed was incurred as the result of the injury to or destruction of the property.
§ 136.217 Compensation allowable.
(a) The amount of compensation allowable for damaged property is the lesser of—
(1) Actual or estimated net cost of repairs necessary to restore the property to substantially the same condition which existed immediately before the damage;
(2) The difference between value of the property before and after the damage; or
(3) The replacement value.
(b) Compensation for economic loss resulting from the destruction of real or personal property may be allowed in an amount equal to the reasonable costs actually incurred for use of substitute commercial property or, if substitute commercial property was not reasonably available, in an amount equal to the net economic loss which resulted from not having use of the property. When substitute commercial property was reasonably available, but not used, allowable compensation for loss of use is limited to the cost of the substitute commercial property, or the property lost, whichever is less. Compensation for loss of use of noncommercial property is not allowable.
(c) Compensation for a claim for loss of profits or impairment of earning capacity under § 136.213(b) is limited to that allowable under § 136.235.
Subsistence Use
§ 136.219 Authorized claimants.
(a) A claim for loss of subsistence use of natural resources may be presented only by a claimant who actually uses, for subsistence, the natural resources which have been injured, destroyed, or lost, without regard to the ownership or management of the resources.
(b) A claim for loss of profits or impairment of earning capacity due to loss of subsistence use of natural resources must be included as part of the claim under this section and must include the proof required under § 136.233.
§ 136.221 Proof.
In addition to the requirements of subparts A and B of this part, a claimant must provide—
(a) The identification of each specific natural resource for which compensation for loss of subsistence use is claimed;
(b) A description of the actual subsistence use made of each specific natural resource by the claimant;
(c) A description of how and to what extent the claimant's subsistence use was affected by the injury to or loss of each specific natural resource;
(d) A description of each effort made by the claimant to mitigate the claimant's loss of subsistence use; and
(e) A description of each alternative source or means of subsistence available to the claimant during the period of time for which loss of subsistence is claimed, and any compensation available to the claimant for loss of subsistence.
§ 136.223 Compensation allowable.
(a) The amount of compensation allowable is the reasonable replacement cost of the subsistence loss suffered by the claimant if, during the period of time for which the loss of subsistence is claimed, there was no alternative source or means of subsistence available.
(b) The amount of compensation allowable under paragraph (a) of this section must be reduced by—
(1) All compensation made available to the claimant to compensate for subsistence loss;
(2) All income which was derived by utilizing the time which otherwise would have been used to obtain natural resources for subsistence use; and
(3) Overheads or other normal expenses of subsistence use not incurred as a result of the incident.
(c) Compensation for a claim for loss of profits or impairment of earning capacity under § 136.219(b) is limited to that allowable under § 136.235.
Government Revenues
§ 136.225 Authorized claimants.
A claim for net loss of revenue due to the injury, destruction, or loss of real property, personal property, or natural resources may be presented only by an appropriate claimant sustaining the loss. As used in this section and § 136.277, “revenue” means taxes, royalties, rents, fees, and net profit shares.
§ 136.227 Proof.
In addition to the requirements of Subparts A and B, a claimant must establish—
(a) The identification and description of the economic loss for which compensation is claimed, including the applicable authority, property affected, method of assessment, rate, and method and dates of collection;
(b) That the loss of revenue was due to the injury to, destruction of, or loss of real or personal property or natural resources;
(c) The total assessment or revenue collected for comparable revenue periods; and
(d) The net loss of revenue.
§ 136.229 Compensation allowable.
The amount of compensation allowable is the total net revenue actually lost.
Profits and Earning Capacity
§ 136.231 Authorized claimants.
(a) A claim for loss of profits or impairment of earning capacity due to the injury to, destruction of, or loss of real or personal property or natural resources may be presented by a claimant sustaining the loss or impairment. The claimant need not be the owner of the damaged property or resources to recover for lost profits or income.
(b) A claim for loss of profits or impairment of earning capacity that also involves a claim for injury to, or economic losses resulting from destruction of, real or personal property must be claimed under § 136.213.
(c) A claim for loss of profits or impairment of earning capacity that also involves a claim for loss of subsistence use of natural resources must be claimed under § 136.219.
§ 136.233 Proof.
In addition to the requirements of subparts A and B of this part, a claimant must establish the following:
(a) That real or personal property or natural resources have been injured, destroyed, or lost.
(b) That the claimant's income was reduced as a consequence of injury to, destruction of, or loss of the property or natural resources, and the amount of that reduction.
(c) The amount of the claimant's profits or earnings in comparable periods and during the period when the claimed loss or impairment was suffered, as established by income tax returns, financial statements, and similar documents. In addition, comparative figures for profits or earnings for the same or similar activities outside of the area affected by the incident also must be established.
(d) Whether alternative employment or business was available and undertaken and, if so, the amount of income received. All income that a claimant received as a result of the incident must be clearly indicated and any saved overhead and other normal expenses not incurred as a result of the incident must be established.
§ 136.235 Compensation allowable.
The amount of compensation allowable is limited to the actual net reduction or loss of earnings or profits suffered. Calculations for net reductions or losses must clearly reflect adjustments for—
(a) All income resulting from the incident;
(b) All income from alternative employment or business undertaken;
(c) Potential income from alternative employment or business not undertaken, but reasonably available;
(d) Any saved overhead or normal expenses not incurred as a result of the incident; and
(e) State, local, and Federal taxes.
Government Public Services
§ 136.237 Authorized claimants.
A claim for net costs of providing increased or additional public services during or after removal activities, including protection from fire, safety, or health hazards, caused by a discharge of oil may be presented only by a State or a political subdivision of a State incurring the costs.
§ 136.239 Proof.
In addition to the requirements of subparts A and B of this part, a claimant must establish—
(a) The nature of the specific public services provided and the need for those services;
(b) That the services occurred during or after removal activities;
(c) That the services were provided as a result of a discharge of oil and would not otherwise have been provided; and
(d) The net cost for the services and the methods used to compute those costs.
§ 136.241 Compensation allowable.
The amount of compensation allowable is the net cost of the increased or additional service provided by the State or political subdivision.
Subpart D Designation of Source and Advertisement
§ 136.301 Purpose.
This subpart prescribes the requirements concerning designation of the source or sources of the discharge or threat of discharge and advertisement of these designations, including the procedures by which claims may be presented to the responsible party or guarantor.
§ 136.303 Definitions.
As used in this subpart—
Advertisement means the dissemination of information, including but not limited to paid advertisements, that are reasonably calculated to advise the public how to present a claim.
Designated source means a source designated under § 136.305.
Designation of Source
§ 136.305 Notice of designation.
(a) When information of an incident is received, the source or sources of the discharge or threat are designated, where possible and appropriate. If the designated source is a vessel or facility, the responsible party and the guarantor, if known, are notified by telephone, telefax, or other rapid means of that designation. The designation will be confirmed by a written Notice of Designation.
(b) A Notice of Designation normally contains, to the extent known—
(1) The name of the vessel or facility designated as the source;
(2) The location, date, and time of the incident;
(3) The type and quantity of oil involved;
(4) The date of the designation;
(5) The procedures for accepting or denying the designation; and
(6) The name, address, telephone number, and, if available, telefax number of the responsible Federal official to whom further communication regarding the incident, advertisement of the incident, or denial of designation should be directed.
[USCG-91-035, 57 FR 36316, Aug. 12, 1992, as amended by USCG-2012-0306, 77 FR 37315, June 21, 2012]
§ 136.307 Denial of designation.
(a) Within five days after receiving a Notice of Designation under § 136.305, the responsible party or guarantor may deny the designation.
(b) A denial of designation must—
(1) Be in writing;
(2) Identify the Notice of Designation;
(3) Give the reasons for the denial and provide a copy of all supporting documents; and
(4) Be submitted to the official named in the Notice of Designation.
(c) A denial is deemed received on the date the denial is actually received by the official named in the Notice of Designation.
Advertisement
§ 136.309 Advertisement determinations.
(a) The Director, NPFC, determines for each incident the type, geographic scope, frequency, and duration of advertisement required.
(b) In making the determination specified in paragraph (a) of this section, the Director, NPFC, may consider—
(1) The nature and extent of economic losses that have occurred or are likely to occur;
(2) The potential claimants who are likely to incur economic losses;
(3) The geographical area that is or will likely be affected;
(4) The most effective method of reasonably notifying potential claimants of the designation and procedures of submitting claims; and
(5) Relevant information or recommendations, if any, submitted by, or on behalf of, the responsible party or guarantor of the designated source.
(c) The Director, NPFC, provides the specific requirements for advertisement for each incident to the responsible party or guarantor of the designated source.
(d) If a responsible party or guarantor has not denied designation in accordance with § 136.307, the party or guarantor shall advertise, in accordance with the requirements of this subpart, the designation and the procedures by which claims may be presented. The advertisement must begin not later than 15 days after the date of the designation made under § 136.305.
(e) If there is no designation under § 136.305, if the source of the discharge or threat is a public vessel, or if the responsible party and guarantor of the source designated have denied the designation or failed to meet the requirements for advertisement in this section, the Director, NPFC, may advertise procedures for presenting claims.
§ 136.311 Types of advertisement.
Advertisement required by the Director, NPFC, will normally include one or more of the following:
(a) Paid advertisements in a newspaper or newspapers having general circulation in the area designated by the Director, NPFC.
(b) Notice posted in marinas, marine supply stores, bait and tackle shops, and other appropriate business establishments or public facilities in the area designated by the Director, NPFC.
(c) News releases to newspapers, radio stations, television stations, and cable services having general circulation in the area designated by the Director, NPFC.
(d) Other means approved by the Director, NPFC, under the circumstances of each case.
§ 136.313 Content of advertisement.
Each advertisement required by this subpart may be required to contain the following information or to indicate where this information may be contained:
(a) Location, date, and time of the incident.
(b) Geographical area affected, as determined by the FOSC or Director, NPFC.
(c) Type and quantity of oil involved.
(d) Name or other description of the source designated by the FOSC or Director, NPFC.
(e) Name of the responsible party and guarantor of the designated source.
(f) Name, address, telephone number, office hours, and work days of the person or persons to whom claims are to be presented and from whom claim information can be obtained.
(g) The procedures by which a claim may be presented.
(h) Other information required by the Director, NPFC, under the circumstances of each case.
PART 137 OIL SPILL LIABILITY: STANDARDS FOR CONDUCTING ALL APPROPRIATE INQUIRIES UNDER THE INNOCENT LAND-OWNER DEFENSE
Authority: 33 U.S.C. 2703(d)(4); Sec. 1512 of the Homeland Security Act of 2002, Pub. L. 107-296, Title XV, Nov. 25, 2002, 116 Stat. 2310 (6 U.S.C. 552(d)); Department of Homeland Security Delegation No. 14000.
Source: USCG-2006-25708, 73 FR 2150, Jan. 14, 2008, unless otherwise noted.
Subpart A Introduction
§ 137.1 Purpose and applicability.
(a) In general under the Oil Pollution Act of 1990 (33 U.S.C. 2701, et seq.), an owner or operator of a facility (as defined in § 137.10) that is the source of a discharge, or a substantial threat of discharge, of oil into the navigable waters or adjoining shorelines or the exclusive economic zone is liable for damages and removal costs resulting from the discharge or threat. However, if that person can demonstrate, among other criteria not addressed in this part, that they did not know and had no reason to know at the time of their acquisition of the real property on which the facility is located that oil was located on, in, or at the facility, the person may be eligible for the innocent landowner defense to liability under 33 U.S.C. 2703(d)(4). One element of the defense is that the person made all appropriate inquiries into the nature of the real property on which the facility is located before acquiring it. The purpose of this part is to prescribe standards and practices for making those inquiries.
(b) Under 33 U.S.C. 2703(d)(4)(E), this part does not apply to real property purchased by a non-governmental entity or non-commercial entity for residential use or other similar uses where a property inspection and a title search reveal no basis for further investigation. In those cases, the property inspection and title search satisfy the requirements of this part.
(c) This part does not affect the existing OPA 90 liability protections for State and local governments that acquire a property involuntarily in their functions as sovereigns under 33 U.S.C. 2703(d)(2)(B). Involuntary acquisition of properties by State and local governments fall under the provisions of 33 U.S.C. 2703(d)(2)(B), not under the all-appropriate-inquiries provision of 33 U.S.C. 2703(d)(4) and this part.
§ 137.5 Disclosure obligations.
(a) Under 33 U.S.C. 2703(c)(1), persons specified in § 137.1(a), including environmental professionals, must report the incident as required by law if they know or have reason to know of the incident.
(b) This part does not limit or expand disclosure obligations under any Federal, State, tribal, or local law. It is the obligation of each person, including environmental professionals, conducting inquiries to determine his or her respective disclosure obligations under Federal, State, tribal, and local law and to comply with them.
§ 137.10 How are terms used in this part defined?
(a) The following terms have the same definitions as in 33 U.S.C. 2701: damages; discharge; incident; liable or liability; oil; owner or operator; and removal costs.
(b) As used in this part—
Abandoned property means a property that, because of its general disrepair or lack of activity, a reasonable person could believe that there is an intent on the part of the current owners to surrender their rights to the property.
Adjoining property means real property the border of which is shared in part or in whole with that of the subject property or that would be shared in part or in whole with that of the property but for a street, road, or other public thoroughfare separating the properties.
Data gap means a lack of, or inability to, obtain information required by subpart B of this part despite good faith efforts by the environmental professional or persons specified in § 137.1(a), as appropriate, to gather the information under § 137.33.
Environmental professional means an individual who meets the requirements of § 137.25.
Facility means any structure, group of structures, equipment, or device (other than a vessel) which is used for one or more of the following purposes: exploring for, drilling for, producing, storing, handling, transferring, processing, or transporting oil. This term includes any motor vehicle, rolling stock, or pipeline used for one or more of these purposes.
Good faith means the absence of any intention to seek an unfair advantage or to defraud another party; an honest and sincere intention to fulfill one's obligations in the conduct or transaction concerned.
Institutional controls means non-engineered instruments, such as administrative and/or legal controls, that help to minimize the potential for human exposure to oil discharge and/or protect the integrity of a removal action.
Relevant experience means participation in the performance of all-appropriate-inquiries investigations, environmental site assessments, or other site investigations that may include environmental analyses, investigations, and remediation which involve the understanding of surface and subsurface environmental conditions and the processes used to evaluate these conditions and for which professional judgment was used to develop opinions regarding conditions indicative of the presence or likely presence of oil at the facility and the real property on which the facility is located.
§ 137.15 References: Where can I get a copy of the publication mentioned in this part?
Section 137.20 of this part refers to ASTM E 1527-05, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process. That document is available from ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. It is also available for inspection at the Coast Guard National Pollution Funds Center, Law Library, NPFC CV, U.S. Coast Guard Stop 7605, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7605.
[USCG-2009-0416, 74 FR 27441, June 10, 2009, as amended by USCG-2016-0498, 82 FR 35082, July 28, 2017]
Subpart B Standards and Practices
§ 137.18 Duties of persons specified in § 137.1(a).
In order to make all appropriate inquiries, persons seeking to establish the liability protection under § 137.1(a) must conduct the inquiries and investigations as required in this part and ensure that the inquiries and investigations required to be made by environmental professionals are made.
§ 137.20 May industry standards be used to comply with this regulation?
The industry standards in ASTM E 1527-05, (Referenced in § 137.15) may be used to comply with the requirements set forth in §§ 137.45 through 137.85 of this part. Use of ASTM E 1527-05 for this purpose is optional and not mandatory.
§ 137.25 Qualifications of the environmental professional.
(a) An environmental professional is an individual who possesses sufficient specific education, training, and experience necessary to exercise professional judgment to develop opinions and conclusions regarding conditions indicative of the presence or likely presence of oil at a facility and the real property on which the facility is located sufficient to meet the objectives and performance factors in § 137.30(a) and (b).
(1) Such a person must—
(i) Hold a current Professional Engineer's or Professional Geologist's license or registration from a State, tribe, or U.S. territory (or the Commonwealth of Puerto Rico) and have the equivalent of 3 years of full-time relevant experience;
(ii) Be licensed or certified by the Federal government, a State, tribe, or U.S. territory (or the Commonwealth of Puerto Rico) to perform environmental inquiries under § 137.35 and have the equivalent of 3 years of full-time relevant experience;
(iii) Have a Baccalaureate or higher degree from an accredited institution of higher education in a discipline of engineering or science and the equivalent of 5 years of full-time relevant experience; or
(iv) Have the equivalent of 10 years of full-time relevant experience.
(2) An environmental professional should remain current in his or her field through participation in continuing education or other activities.
(3) The requirements for an environmental professional in this section do not preempt State professional licensing or registration requirements, such as those for a professional geologist, engineer, or site-remediation professional. Before commencing work, a person should determine the applicability of State professional licensing or registration laws to the activities to be undertaken as part of an inquiry under § 137.35(b).
(4) A person who does not qualify as an environmental professional under this section may assist in the conduct of all appropriate inquiries according to this part if the person is under the supervision or responsible charge of an environmental professional meeting the requirements of this section when conducting the inquiries.
§ 137.30 Objectives and performance factors.
(a) Objectives. This part is intended to result in the identification of conditions indicative of the presence or likely presence of oil at the facility and the real property on which the facility is located. In order to meet the objectives of this regulation, persons specified in § 137.1(a) and the environmental professional must seek to identify, through the conduct of the standards and practices in this subpart, the following types of information about the facility and the real property on which the facility is located:
(1) Current and past uses and occupancies of the facility and the real property on which the facility is located.
(2) Current and past uses of oil.
(3) Waste management and disposal activities that indicate presence or likely presence of oil.
(4) Current and past corrective actions and response activities that indicate presence or likely presence of oil.
(5) Engineering controls.
(6) Institutional controls, such as zoning restrictions, building permits, and easements.
(7) Properties adjoining or located nearby the facility and the real property on which the facility is located that have environmental conditions that could have resulted in conditions indicative of the presence or likely presence of oil at the facility and the real property on which the facility is located.
(b) Performance factors. In order to meet this part and to meet the objectives stated in paragraph (a) of this section, the persons specified in § 137.1(a) or the environmental professional (as appropriate to the particular standard and practice) must—
(1) Gather the information that is required for each standard and practice listed in this subpart that is publicly available, is obtainable from its source within a reasonable time and cost, and can be reviewed practicably; and
(2) Review and evaluate the thoroughness and reliability of the information gathered in complying with each standard and practice listed in this subpart taking into account information gathered in the course of complying with the other standards and practices of this part.
§ 137.33 General all appropriate inquiries requirements.
(a) All appropriate inquiries must be conducted within 1 year before the date of acquisition of the real property on which the facility is located, as evidenced by the date of receipt of the documentation transferring title to, or possession of, the real property and must include:
(1) An inquiry by an environmental professional, as provided in § 137.35.
(2) The collection of information under § 137.40 by persons specified in § 137.1(a).
(b) The following components of the all appropriate inquiries must be conducted or updated within 180 days before the date of acquisition of the real property on which the facility is located:
(1) Interviews with past and present owners, operators, and occupants. See § 137.45.
(2) Searches for recorded environmental cleanup liens. See § 137.55.
(3) Reviews of Federal, State, tribal, and local government records. See § 137.60.
(4) Visual inspections of the facility, the real property on which the facility is located, and adjoining properties. See § 137.65.
(5) The declaration by the environmental professional. See § 137.35(d).
(c) All appropriate inquiries may include the results of and information contained in an inquiry previously conducted by, or on behalf of, persons specified in § 137.1(a) who are responsible for the inquiries for the facility and the real property on which the facility is located if—
(1) The information was collected during the conduct of an all-appropriate-inquiries investigation under this part.
(2) The information was collected or updated within 1 year before the date of acquisition of the real property on which the facility is located.
(3) The following components of the inquiries were conducted or updated within 180 days before the date of acquisition of the real property on which the facility is located:
(i) Interviews with past and present owners, operators, and occupants. See § 137.45.
(ii) Searches for recorded environmental cleanup liens. See § 137.55.
(iii) Reviews of Federal, State, tribal, and local government records. See § 137.60.
(iv) Visual inspections of the facility, the real property on which the facility is located, and the adjoining properties. See § 137.65.
(v) The declaration by the environmental professional. See § 137.35(d).
(4) Previously collected information is updated by including relevant changes in the conditions of the facility and the real property on which the facility is located and specialized knowledge, as outlined in § 137.70, of the persons conducting the all appropriate inquiries for the facility and the real property on which the facility is located, including persons specified in § 137.1(a) and the environmental professional.
(d) All appropriate inquiries may include the results of an environmental professional's report under § 137.35(c) that have been prepared by or for other persons if—
(1) The reports meet the objectives and performance factors in § 137.30(a) and (b); and
(2) The person specified in § 137.1(a) reviews the information and conducts the additional inquiries under §§ 137.70, 137.75, and 137.80 and updates the inquiries requiring an update under paragraph (b) of this section.
(e) To the extent there are data gaps that affect the ability of persons specified in § 137.1(a) and environmental professionals to identify conditions indicative of the presence or likely presence of oil, the gaps must be identified in the report under § 137.35(c)(2). In addition, the sources of information consulted to address data gaps should be identified and the significance of the gaps noted. Sampling and analysis may be conducted to develop information to address data gaps.
(f) Any conditions indicative of the presence or likely presence of oil identified as part of the all-appropriate-inquiries investigation should be noted in the report.
§ 137.35 Inquiries by an environmental professional.
(a) Inquiries by an environmental professional must be conducted either by the environmental professional or by a person under the supervision or responsible charge of an environmental professional.
(b) The inquiry of the environmental professional must include the requirements in §§ 137.45 (interviews with past and present owners), 137.50 (reviews of historical sources), 137.60 (reviews of government records), 137.65 (visual inspections), 137.80 (commonly known or reasonably ascertainable information) and 137.85 (degree of obviousness of the presence or likely presence of oil). In addition, the inquiry should take into account information provided to the environmental professional by the person specified in § 137.1(a) conducting the additional inquiries under § 137.40.
(c) The results of the inquiry by an environmental professional must be documented in a written report that, at a minimum, includes the following:
(1) An opinion as to whether the inquiry has identified conditions indicative of the presence or likely presence of oil at the facility and the real property on which the facility is located.
(2) An identification of data gaps in the information developed as part of the inquiry that affect the ability of the environmental professional to identify conditions indicative of the presence or likely presence of oil at the facility and the real property on which the facility is located. The report must also indicate whether the gaps prevented the environmental professional from reaching an opinion regarding the identification of conditions indicative of the presence or likely presence of oil.
(3) The qualifications of the environmental professional.
(4) An opinion regarding whether additional appropriate investigation is necessary.
(d) The environmental professional must place the following statements in the written document identified in paragraph (c) of this section and sign the document: “[I, We] declare that, to the best of [my, our] professional knowledge, [I, we] meet the requirements under 33 CFR 137.25 for an environmental professional.” and “[I, We] have the specific qualifications based on education, training, and experience to assess the nature, history, and setting of a facility and the real property on which it is located. [I, We] have developed and conducted all appropriate inquiries according to the standards and practices in 33 CFR part 137.”
§ 137.40 Additional inquiries.
(a) Persons specified in § 137.1(a) must conduct inquiries in addition to those conducted by the environmental professional under § 137.35 and may provide the information associated with these additional inquiries to the environmental professional responsible for conducting the activities listed in § 137.35—
(1) As required by § 137.55 and if not otherwise obtained by the environmental professional, environmental cleanup liens against the facility and the real property on which it is located that are filed or recorded under Federal, State, tribal, or local law.
(2) As required by § 137.70, specialized knowledge or experience of the person specified in § 137.1(a).
(3) As required by § 137.75, the relationship of the purchase price to the fair market value of the facility and the real property on which the facility is located if the oil was not at the facility and the real property on which it is located.
(4) As required by § 137.80 and if not otherwise obtained by the environmental professional, commonly known or reasonably ascertainable information about the facility and the real property on which it is located.
(b) [Reserved]
§ 137.45 Interviews with past and present owners, operators, and occupants.
(a) Interviews with owners, operators, and occupants of the facility and the real property on which the facility is located must be conducted for the purposes of achieving the objectives and performance factors of § 137.30(a) and (b).
(b) The inquiry of the environmental professional must include interviewing the current owner and occupant of the facility and the real property on which the facility is located. If the facility and the real property on which the facility is located has multiple occupants, the inquiry of the environmental professional must include interviewing major occupants, as well as those occupants likely to use, store, treat, handle or dispose of oil or those who have likely done so in the past.
(c) The inquiry of the environmental professional also must include, to the extent necessary to achieve the objectives and performance factors in § 137.30(a) and (b), interviewing one or more of the following persons:
(1) Current and past facility and real property managers with relevant knowledge of uses and physical characteristics of the facility and the real property on which the facility is located.
(2) Past owners, occupants, or operators of the facility and the real property on which the facility is located.
(3) Employees of current and past occupants of the facility and the real property on which the facility is located.
(d) In the case of inquiries conducted at abandoned properties where there is evidence of potential unauthorized uses or evidence of uncontrolled access, the environmental professional's inquiry must include an interview of at least one owner or occupant of a neighboring property from which it appears possible that the owner or occupant of the neighboring property could have observed use or other presence or likely presence of oil.
§ 137.50 Reviews of historical sources of information.
(a) Historical documents and records must be reviewed for the purposes of achieving the objectives and performance factors of § 137.30(a) and (b). Historical documents and records may include, but are not limited to, aerial photographs, fire insurance maps, building department records, chain of title documents, and land use records.
(b) Historical documents and records reviewed must cover a period of time as far back in the history of the real property to when the first structure was built or when it was first used for residential, agricultural, commercial, industrial, or governmental purposes. The environmental professional may exercise professional judgment in context of the facts available at the time of the inquiry as to how far back in time it is necessary to search historical records.
§ 137.55 Searches for recorded environmental cleanup liens.
(a) All appropriate inquiries must include a search for the existence of environmental cleanup liens against the facility and the real property on which the facility is located that are filed or recorded under Federal, State, tribal, or local law.
(b) All information collected by persons specified in § 137.1(a) rather than an environmental professional regarding the existence of environmental cleanup liens associated with the facility and the real property on which the facility is located may be provided to the environmental professional or retained by the applicable party.
§ 137.60 Reviews of Federal, State, tribal, and local government records.
(a) Federal, State, tribal, and local government records or databases of government records of the facility, the real property on which the facility is located, and adjoining properties must be reviewed for the purposes of achieving the objectives and performance factors of § 137.30(a) and (b).
(b) With regard to the facility and the property on which the facility is located, the review of Federal, State, and tribal government records or databases of the government records and local government records and databases of the records should include—
(1) Records of reported oil discharges present, including site investigation reports for the facility and the real property on which the facility is located;
(2) Records of activities, conditions, or incidents likely to cause or contribute to discharges or substantial threat of discharges of oil, including landfill and other disposal unit location records and permits, storage tank records and permits, hazardous waste handler and generator records and permits, Federal, tribal and State government listings of sites identified as priority cleanup sites, and spill reporting records;
(3) Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) records;
(4) Public health records;
(5) Emergency Response Notification System records;
(6) Registries or publicly available lists of engineering controls; and
(7) Registries or publicly available lists of institutional controls, including environmental land use restrictions, applicable to the facility and the real property on which the facility is located.
(c) With regard to nearby or adjoining properties, the review of Federal, State, tribal, and local government records or databases of government records should include the identification of the following:
(1) Properties for which there are government records of reported discharges or substantial threat of discharges of oil. Such records or databases containing such records and the associated distances from the facility and the real property on which the facility is located for which such information should be searched include the following:
(i) Records of National Priorities List (NPL) sites or tribal- and State-equivalent sites (one mile).
(ii) Resource Conservation and Recovery Act (RCRA) properties subject to corrective action (one mile).
(iii) Records of Federally-registered, or State-permitted or -registered, hazardous waste sites identified for investigation or remediation, such as sites enrolled in State and tribal voluntary cleanup programs and tribal- and State-listed brownfield sites (one-half mile).
(iv) Records of leaking underground storage tanks (one-half mile).
(2) Properties that previously were identified or regulated by a government entity due to environmental concerns at the facility and the real property on which the facility is located. The records or databases containing the records and the associated distances from the facility and the real property on which the facility is located for which the information should be searched include the following:
(i) Records of delisted NPL sites (one-half mile).
(ii) Registries or publicly available lists of engineering controls (one-half mile).
(iii) Records of former CERCLIS sites with no further remedial action notices (one-half mile).
(3) Properties for which there are records of Federally-permitted, State-permitted or -registered, or tribal-permitted or -registered waste management activities. The records or databases that may contain the records include the following:
(i) Records of RCRA small quantity and large quantity generators (adjoining properties).
(ii) Records of Federally-permitted, State-permitted or -registered, or tribal-permitted landfills and solid waste management facilities (one-half mile).
(iii) Records of registered storage tanks (adjoining property).
(4) A review of additional government records with regard to sites identified under paragraphs (c)(1) through (c)(3) of this section may be necessary in the judgment of the environmental professional for the purpose of achieving the objectives and performance factors of §§ 137.30(a) and (b).
(d) The search distance from the real property boundary for reviewing government records or databases of government records listed in paragraph (c) of this section may be modified based upon the professional judgment of the environmental professional. The rationale for the modifications must be documented by the environmental professional. The environmental professional may consider one or more of the following factors in determining an alternate appropriate search distance—
(1) The nature and extent of a discharge.
(2) Geologic, hydrogeologic, or topographic conditions of the property and surrounding environment.
(3) Land use or development densities.
(4) The property type.
(5) Existing or past uses of surrounding properties.
(6) Potential migration pathways (e.g., groundwater flow direction, prevalent wind direction).
(7) Other relevant factors.
§ 137.65 Visual inspections of the facility, the real property on which the facility is located, and adjoining properties.
(a) For the purpose of achieving the objectives and performance factors of § 137.30(a) and (b), the inquiry of the environmental professional must include the following:
(1) A visual on-site inspection of the facility and the real property on which the facility is located, and the improvements at the facility and real property, including a visual inspection of the areas where oil may be or may have been used, stored, treated, handled, or disposed. Physical limitations to the visual inspection must be noted.
(2) A visual inspection of adjoining properties, from the subject real property line, public rights-of-way, or other vantage point (e.g., aerial photography), including a visual inspection of areas where oil may be or may have been stored, treated, handled or disposed. A visual on-site inspection is recommended, though not required. Physical limitations to the inspection of adjacent properties must be noted.
(b) Except as in paragraph (c) of this section, a visual on-site inspection of the facility and the real property on which the facility is located must be conducted.
(c) An on-site inspection is not required if an on-site visual inspection of the facility and the real property on which the facility is located cannot be performed because of physical limitations, remote and inaccessible location, or other inability to obtain access to the facility and the real property on which the facility is located after good faith efforts have been taken to obtain access. The mere refusal of a voluntary seller to provide access to the facility and the real property on which the facility is located is not justification for not conducting an on-site inspection. The inquiry of the environmental professional must include—
(1) Visually inspecting the facility and the real property on which the facility is located using another method, such as aerial imagery for large properties, or visually inspecting the facility and the real property on which the facility is located from the nearest accessible vantage point, such as the property line or public road for small properties;
(2) Documenting the efforts undertaken to obtain access and an explanation of why such efforts were unsuccessful; and
(3) Documenting other sources of information regarding the presence or likely presence of oil at the facility and the real property on which the facility is located that were consulted according to § 137.30(a). The documentation should include comments, if any, by the environmental professional on the significance of the failure to conduct a visual on-site inspection of the facility and the real property on which the facility is located with regard to the ability to identify conditions indicative of the presence or likely presence of oil at the facility and the real property.
§ 137.70 Specialized knowledge or experience on the part of persons specified in § 137.1(a).
(a) For the purpose of identifying conditions indicative of the presence or likely presence of oil at the facility and the real property on which the facility is located, persons specified in § 137.1(a) must take into account their own specialized knowledge of the facility and the real property on which the facility is located, the area surrounding the facility and the real property on which the facility is located, and the conditions of adjoining properties and their experience relevant to the inquiry.
(b) The results of all appropriate inquiries under § 137.33 must take into account the relevant and applicable specialized knowledge and experience of the persons specified in § 137.1(a) responsible for undertaking the inquiry.
§ 137.75 The relationship of the purchase price to the value of the facility and the real property on which the facility is located, if oil was not at the facility or on the real property.
(a) Persons specified in § 137.1(a) must consider whether the purchase price of the facility and the real property on which the facility is located reasonably reflects the fair market value of the facility and real property if oil was not present or likely present.
(b) If the persons conclude that the purchase price does not reasonably reflect the fair market value of that facility and real property if oil was not at the facility and the real property, they must consider whether or not the differential in purchase price and fair market value is due to the presence or likely presence of oil.
§ 137.80 Commonly known or reasonably ascertainable information about the facility and the real property on which the facility is located.
(a) Throughout the inquiries, persons specified in § 137.1(a) and environmental professionals conducting the inquiry must take into account commonly known or reasonably ascertainable information within the local community about the facility and the real property on which the facility is located and consider that information when seeking to identify conditions indicative of the presence or likely presence of oil at the facility and the real property.
(b) Commonly known information may include information obtained by the person specified in § 137.1(a) or by the environmental professional about the presence or likely presence of oil at the facility and the real property on which the facility is located that is incidental to the information obtained during the inquiry of the environmental professional.
(c) To the extent necessary to achieve the objectives and performance factors of § 137.30(a) and (b), the person specified in § 137.1(a) and the environmental professional must gather information from varied sources whose input either individually or taken together may provide commonly known or reasonably ascertainable information about the facility and the real property on which the facility is located; the environmental professional may refer to one or more of the following sources of information:
(1) Current owners or occupants of neighboring properties or properties adjacent to the facility and the real property on which the facility is located.
(2) Local and state government officials who may have knowledge of, or information related to, the facility and the real property on which the facility is located.
(3) Others with knowledge of the facility and the real property on which the facility is located.
(4) Other sources of information, such as newspapers, Web sites, community organizations, local libraries, and historical societies.
§ 137.85 The degree of obviousness of the presence or likely presence of oil at the facility and the real property on which the facility is located and the ability to detect the oil by appropriate investigation.
(a) Persons specified in § 137.1(a) and environmental professionals conducting an inquiry of a facility and the real property on which it is located on their behalf must take into account the information collected under §§ 137.45 through 137.80 in considering the degree of obviousness of the presence or likely presence of oil at the facility and the real property on which the facility is located.
(b) Persons specified in § 137.1(a) and environmental professionals conducting an inquiry of a facility and the property on which the facility is located on their behalf must take into account the information collected under §§ 137.45 through 137.80 in considering the ability to detect the presence or likely presence of oil by appropriate investigation. The report of the environmental professional should include an opinion under § 137.35(c)(4) regarding whether additional appropriate investigation is necessary.
PART 138 EVIDENCE OF FINANCIAL RESPONSIBILITY FOR WATER POLLUTION (VESSELS) AND OPA 90 LIMITS OF LIABILITY (VESSELS, DEEPWATER PORTS AND ONSHORE FACILITIES)
Authority: 6 U.S.C. 552(d); 33 U.S.C. 2704, 2716, 2716a; 42 U.S.C. 9608, 9609; E.O. 12580, Sec. 7(b), 3 CFR, 1987 Comp., p. 193; E.O. 12777, Secs. 4 and 5, 3 CFR, 1991 Comp., p. 351, as amended by E.O. 13286, Sec. 89, 3 CFR, 2004 Comp., p. 166, and by E.O. 13638, Sec. 1, 3 CFR, 2014 Comp., p.227; Department of Homeland Security Delegation Nos. 00170.1, Revision 01.2 and 5110, Revision 01. Section 138.40 also issued under the authority of 46 U.S.C. 2103 and 14302.
Source: USCG-2005-21780, 73 FR 53697, Sept. 17, 2008, unless otherwise noted.
Subpart A Evidence of Financial Responsibility for Water Pollution (Vessels)
Source: 86 FR 68139, Dec. 1, 2021, unless otherwise noted.
§ 138.10 Scope and purpose.
(a) Scope. This subpart sets forth—
(1) The requirements and procedures each COFR Operator (as defined in § 138.30(b)) must use to establish and maintain the evidence of financial responsibility required by the OPA 90 and CERCLA (both defined in § 138.30), and to obtain Certificates of Financial Responsibility (COFR);
(2) The standards and procedures the Coast Guard uses to determine the acceptability of guarantors;
(3) The procedures guarantors must use to submit evidence of financial responsibility on behalf of the responsible parties for vessels to which this subpart applies;
(4) The requirements for designating and maintaining U.S. agents for service of process;
(5) The requirements for reporting changes affecting compliance with this subpart; and
(6) The enforcement actions that may result from non-compliance with this subpart or OPA 90, CERCLA, or both, referenced in paragraph (a)(1) of this section.
(b) Purpose. These requirements ensure that the responsible parties for vessels to which this subpart applies, have sufficient available financial resources to cover their potential liabilities to the United States and other claimants in the following scenarios:
(1) Under OPA 90 in the event of a discharge, or substantial threat of a discharge, of oil; and
(2) In the case of vessels greater than 300 gross tons, under CERCLA in the event of a release, or threatened release, of a hazardous substance.
§ 138.20 Applicability.
(a) Applicability generally. This subpart applies—
(1) To the COFR Operator of—
(i) Any vessel over 300 gross tons (except a vessel listed in paragraph (d)(1) or (2) of this section) using the navigable waters of the United States, or any port or other place subject to the jurisdiction of the United States, including any such vessel using a deepwater port or other offshore facility subject to the jurisdiction of the United States;
(ii) Any vessel of any size (except a vessel listed in paragraph (d)(1) or (3) of this section) using the waters of the Exclusive Economic Zone to transship or lighter oil (whether delivering or receiving) destined for a place subject to the jurisdiction of the United States; and
(iii) Any tank vessel over 100 gross tons (except a vessel listed in paragraph (d)(1) or (3) of this section) using the navigable waters of the United States, or any port or other place subject to the jurisdiction of the United States, including any such tank vessel using a deepwater port or other offshore facility subject to the jurisdiction of the United States;
(2) To a guarantor providing evidence of financial responsibility under this subpart on behalf of one or more of a vessel's responsible parties;
(3) To responsible parties other than the COFR Operator designated to represent the responsible parties for purposes of this subpart; and
(4) To any person serving as a U.S. agent for service of process under this subpart.
(b) How to apply this part to mobile offshore drilling units. For the purposes of applying the evidence of financial responsibility required under OPA 90 and this subpart and the limits of liability set forth in subpart B of this part, and in addition to any OPA 90 offshore facility evidence of financial responsibility requirements that may apply under 30 CFR part 553, a mobile offshore drilling unit is treated as—
(1) A tank vessel when it is being used as an offshore facility; and
(2) A vessel other than a tank vessel when it is not being used as an offshore facility.
(c) How to apply CERCLA evidence of financial responsibility to self-propelled vessels. For the purposes of applying the evidence of financial responsibility required under CERCLA and for vessels identified in paragraph (a)(1)(i) of this section, this subpart applies to a self-propelled vessel over 300 gross tons even if it does not carry hazardous substances.
(d) Exceptions. (1) This subpart does not apply to public vessels.
(2) Paragraph (a)(1)(i) of this section does not apply to any non-self-propelled barge that does not carry oil as cargo or fuel and does not carry hazardous substances as cargo.
(3) Paragraphs (a)(1)(ii) and (iii) of this section do not apply to: any offshore supply vessel; any fishing vessel or fish tender vessel of 750 gross tons or less that transfers fuel without charge to a fishing vessel owned by the same person; any towing or pushing vessel (tug) simply because it has in its custody a tank barge; or any tank vessel that only carries, or is adapted to carry, non-liquid hazardous material in bulk as cargo or cargo residue.
§ 138.30 Definitions.
(a) As used in this subpart, the following terms have the meanings set forth in—
(1) OPA 90 (specifically in 33 U.S.C. 2701): Claim, claimant, damages, deepwater port, discharge, Exclusive Economic Zone, facility, incident, liable or liability, mobile offshore drilling unit, navigable waters, offshore facility, oil, owner or operator, person, remove, removal, removal costs, responsible party, tank vessel, United States, and vessel; and
(2) CERCLA (42 U.S.C. 9601): Claim, claimant, damages, facility, hazardous substance, liable or liability, navigable waters, offshore facility, owner or operator, person, remove, removal, United States, and vessel.
(3) 46 CFR 69.9: Convention Measurement System, foreign-flag vessel, gross tonnage ITC (GT ITC) 1 and gross register tonnage (GRT), tonnage, and U.S.-flag vessel.
1 The acronym “ITC” refers to the International Tonnage Convention. GT ITC, as defined in 46 CFR 69.9 means the gross tonnage measurement of a vessel as applied under the Convention Measurement System.
(b) As used in this subpart—
Applicable amount means an OPA 90 or CERCLA evidence of financial responsibility amount determined to apply to a vessel as provided under § 138.100.
Application means an “Application for Vessel Certificate of Financial Responsibility (Water Pollution)”, which the COFR Operator for one or more vessels has completed and verified in eCOFR, as provided in § 138.60(c)(1)(i), or signed, dated, and submitted to the NPFC by one of the submission methods specified in § 138.60(c)(1)(ii) through (iv).
Cargo means goods or materials carried on board a vessel for purposes of transportation, whether proprietary or nonproprietary. A hazardous substance or oil carried solely for use aboard the carrying vessel is not cargo.
CERCLA means the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (42 U.S.C. 9601, et seq.).
COFR means a current Certificate of Financial Responsibility (Water Pollution) issued by the Director, under this subpart, as provided in § 138.70, and posted on the NPFC COFR program website https://npfc.uscg.mil/cofr/default.aspx.
COFR Operator means a responsible party who conducts, or has responsibility for, the operation of a vessel to which this subpart applies—that is, a person who is an operator as defined in OPA 90 and CERCLA, and, when there is more than one responsible party (including more than one operator), is the operator designated and authorized by all the vessel's responsible parties to act on their behalf for the purpose of complying with this subpart, including submitting (or causing to be submitted) all Applications and requests for COFR renewal, evidence of financial responsibility and reports, and payment of all fees required by § 138.120.
(i) If a vessel has one owner and is operated by that owner, or the owner controls and is responsible for the vessel's operation, the owner is the COFR Operator. In all other cases the person who operates, or controls and is principally responsible for the operation of, the vessel (for example, the demise charterer) is the COFR Operator.
(ii) A person who is responsible, or who agrees by contract to become responsible, for a vessel in the capacity of a builder, repairer, or scrapper, or for the purpose of holding the vessel out for sale or lease, is the COFR Operator. A person who takes possession of, or responsibility for, a newly built, modified, or repaired vessel from a builder or repairer, or who purchases and operates or becomes a demise charterer of a vessel held out for sale or lease, is the COFR Operator.
(iii) A time or voyage charterer who does not assume responsibility for the operation of a vessel is not a COFR Operator for purposes of this subpart.
(iv) The designation of an operator to act as the COFR Operator on behalf of a vessel's responsible parties for purposes of this subpart does not limit who may be determined to be an operator under OPA 90, CERCLA, or both, in the event of an incident or a release.
Day or days means calendar days unless otherwise specified.
Director means the person in charge of the U.S. Coast Guard, National Pollution Funds Center (NPFC), or that person's authorized representative.
eCOFR means the electronic Certificate of Financial Responsibility web-based process located on the NPFC COFR program website, https://npfc.uscg.mil/cofr/default.aspx, and is the process COFR Operators may use to apply for and renew COFRs.
Evidence of financial responsibility means the demonstration of the financial ability of the responsible parties for a vessel to which this subpart applies to meet their potential liabilities under OPA 90, CERCLA, or both, up to the total applicable amount determined as provided under § 138.100.
Financial guarantor is a type of guarantor and means a business entity or other person providing a financial guaranty under § 138.110(c). A financial guarantor is distinct from a COFR insurance guarantor, a self-insurer, or a surety. A self-insurer, however, may also serve as a financial guarantor for others.
Fish tender vessel and fishing vessel have the same meanings as set forth in 46 U.S.C. 2101.
Fleet Certificate means a COFR issued by the Director under this subpart to the COFR Operator of a fleet of 2 or more unmanned, non-self-propelled barges that are not tank vessels and that, from time to time, may be subject to this subpart (for example, a hopper barge over 300 gross tons when carrying oily metal shavings or similar cargo). A Fleet Certificate covers, automatically, all unmanned, non-self-propelled, non-tank barges for which the COFR Operator may from time to time be responsible that does not exceed the maximum gross tonnage indicated on the Fleet Certificate.
Fuel means any oil or hazardous substance used, or capable of being used, to produce heat or power by burning, including power to operate equipment. A hand-carried pump with no more than 5 gallons of fuel capacity, that is neither integral to nor regularly stored aboard a non-self-propelled barge, is not equipment.
Guarantor means any person who has been determined to be acceptable by the Director, as provided in § 138.110, and who is providing evidence of financial responsibility on behalf of one or more of a vessel's responsible parties, other than as a responsible party providing self-insurance under § 138.110(d).
Hazardous material has the same meaning as set forth in 46 U.S.C. 2101.
Individual Certificate means a COFR issued by the Director under this subpart to the COFR Operator for a single vessel.
Insurance guarantor is a type of guarantor and means an insurance company, association of underwriters, ship owners' protection and indemnity association, or other person, serving as a guarantor under § 138.110(b). An insurance guarantor is distinct from a self-insurer, a financial guarantor, or a surety.
Master Certificate means a COFR issued by the Director under this subpart to the COFR Operator of one or more vessels that are under the custody of such person solely in the capacity of a builder, repairer, or scrapper, or for the purpose of holding vessels out for sale or lease, where such person does not physically operate the vessels. A Master Certificate covers, automatically, all of the vessels subject to this subpart held by the COFR Operator solely for purposes of construction, repair, scrapping, sale or lease. A vessel which is being operated commercially in any business venture, including the business of building, repairing, scrapping, leasing, or selling (for example, a slop barge used by a shipyard) cannot be covered by a Master Certificate and must have either a current Individual Certificate or, if applicable, a current Fleet Certificate.
Net worth means the amount of all assets located in the United States, less all liabilities anywhere in the world.
NPFC means the U.S. Coast Guard, National Pollution Funds Center. NPFC is the U.S. Government office responsible for administering the OPA 90 and CERCLA vessel COFR program.
Offshore supply vessel has the same meaning as set forth in 46 U.S.C. 2101.
OPA 90 means the Oil Pollution Act of 1990, as amended (33 U.S.C. 2701, et seq.).
Public vessel means a vessel owned or demise chartered and operated by the United States, by a State or political subdivision thereof, or by a foreign nation, except when the vessel is engaged in commerce.
Release, for purposes of this subpart, means a release as defined in CERCLA (specifically, 42 U.S.C. 9601), or a threatened release, of a hazardous substance.
Responsible party, for purposes of OPA 90 evidence of financial responsibility, has the same meaning as defined at 33 U.S.C. 2701; and, for purposes of CERCLA evidence of financial responsibility, means any person who is an “owner or operator,” as defined at 42 U.S.C. 9601, including any person chartering a vessel by demise.
Self-insurer means a COFR Operator providing evidence of financial responsibility as the responsible party of the subject vessel, as provided under § 138.110(d). A self-insurer is distinct from a guarantor.
Total applicable amount means an evidence of financial responsibility amount that must be demonstrated under this subpart, determined as provided in § 138.100.
Working capital means the amount of current assets located in the United States, less all current liabilities anywhere in the world.
§ 138.40 General requirements.
(a) Requirement to establish and maintain evidence of financial responsibility. The COFR Operator of a vessel must establish and maintain (or cause to be established and maintained) evidence of financial responsibility acceptable to the Director using any one of the methods specified in § 138.110, in an amount equal to or greater than the total applicable amount determined under § 138.100 and, in the case of a financial guarantor, as further provided under § 138.110(c)(2) (aggregation of total applicable amounts). The evidence of financial responsibility required by this paragraph must be—
(1) Established as of the date they become a responsible party; and
(2) Continuously maintained for so long as they remain a responsible party.
(b) Requirement to have a COFR and report changes. The COFR Operator must apply for and ensure the vessel is covered at all times by a current COFR, by complying with the requirements and procedures set forth in this subpart, including the reporting requirements in § 138.150.
§ 138.50 How to apply vessel gross tonnages.
(a) Purpose. This section sets forth the methods for applying vessel gross tonnage to—
(1) Determine whether a vessel exceeds the 100 or 300 gross ton threshold under § 138.20 and OPA 90, CERCLA, or both;
(2) Calculate the OPA 90 and CERCLA applicable amounts of financial responsibility required, as provided in § 138.100; and
(3) Determine the OPA 90 limit of liability under subpart B of this part in the event of an oil pollution incident, and the CERCLA limit of liability under 42 U.S.C. 9607 in the event of a hazardous substance release.
(b) Both GT ITC and GRT assigned. For a vessel assigned both gross tonnage ITC (GT ITC) and gross register tonnage (GRT) under 46 CFR part 69, apply the tonnage thresholds in § 138.20 using the assigned GRT tonnage, and determine the applicable amounts of financial responsibility and the limits of liability using the assigned GT ITC tonnage.
(c) GT ITC or GRT assigned. For a vessel assigned only a GT ITC or a GRT tonnage under 46 CFR part 69, apply the tonnage thresholds in § 138.20, and determine the applicable amounts of evidence of financial responsibility and the limits of liability using the assigned GT ITC or GRT tonnage.
(d) High or low GRT assigned. For a vessel assigned a high and low GRT tonnage under 46 CFR part 69, subpart D (Dual Regulatory Measurement System), apply the tonnage thresholds in § 138.20, and determine the applicable amounts of financial responsibility and the limits of liability, using the high GRT tonnage.
(e) Summary. The use of assigned gross tonnages, as required by paragraphs (b) through (d) of this section, is summarized in the following table.
Table 1 to § 138.50(e)—Use of Assigned Gross Tonnages
Category | Assigned tonnage
To apply the tonnage thresholds in § 138.20 | To determine applicable amounts under § 138.100 and limits of liability
Vessels Assigned Both GT ITC and GRT | GRT | GT ITC.
Vessels Assigned—
GT ITC only | GT ITC | GT ITC.
GRT only | GRT | GRT.
(f) Certified gross tonnage governs. In the event of an incident or release, the responsible parties and guarantors are governed by the vessel's assigned gross tonnage on the date of the incident. This is as determined under paragraphs (b) through (e) of this section and evidenced on the appropriate tonnage certifying document as provided for under the U.S. tonnage regulations or international conventions (for example, tonnage certificate or completed Simplified measurement application, International Tonnage Certificate (1969)), regardless of what gross tonnage is specified in the Application or guaranty form submitted under this subpart, except when the responsible parties or guarantors knew or should have known that the tonnage certificate information was incorrect (see also § 138.110(h)(1)(iii)).
(g) Requirement to present tonnage certifying document(s). Each COFR Operator must submit to the Director, or other authorized United States Government official, upon request, for examination and copying, the original or an unaltered and legible electronic copy of the vessel's applicable tonnage certifying document(s).
§ 138.60 Forms and submissions; ensuring submission timeliness.
(a) Where to obtain forms. All forms referred to in this subpart are available at the NPFC COFR program website, https://npfc.uscg.mil/cofr/default.aspx, and may be completed online or downloaded.
(b) Where to obtain information. Direct all questions concerning the requirements of this subpart to the NPFC at one of the addresses in paragraphs (c)(1)(ii) through (iv) of this section or by calling the NPFC at 202-795-6130.
(c) How to present Applications and other required submissions. (1) Provide all submissions required by this subpart to the Director, by one of the following four methods:
(i) Electronically, using the eCOFR process (located at https://npfc.uscg.mil/cofr/default.aspx);
(ii) By email, sent to such email address as the Director may specify, attaching legible electronic images scanned in a format acceptable to the Director;
(iii) By fax, sent to 202-795-6123 with a cover sheet specifying the total number of pages, the sender's telephone number, and referencing NPFC telephone number 202-795-6130; or
(iv) By mail, addressed to—
Director, National Pollution Funds Center, ATTN: VESSEL CERTIFICATION, U.S. Coast Guard Stop 7605, 2703 Martin Luther King Jr. Ave. SE, Washington, DC 20593-7605.
(2) Submissions may not be hand delivered to the NPFC.
(3) Do not present submissions by more than one method.
(d) Required contents of submissions. Unless otherwise instructed by the Director, all submissions required by this subpart must—
(1) Set forth, in full, the correct legal name of the COFR Operator to whom the COFR is to be, or has been, issued;
(2) Be in English, and
(3) Express all monetary terms in United States dollars.
(e) Ensuring the timeliness of submissions; requesting deadline exceptions. (1) Compliance with a submission deadline will be determined based on the day the submission is received by NPFC. If a deadline specified in this subpart falls on a weekend or Federal holiday, the deadline will occur on the next business day.
(2) Ensuring the timeliness of the submissions is the sole responsibility of the person making the submission.
(3) The Director may, in the Director's sole discretion, grant an exception to a deadline specified in this subpart for good cause shown.
(f) Public access to information. Financial data and other information submitted to the Director is considered public information to the extent required by the Freedom of Information Act (5 U.S.C. 552) and permitted by the Privacy Act (5 U.S.C. 552(a)).
§ 138.70 Issuance and renewal of COFRs.
(a) Types of COFRs. The Director issues the following three types of COFRs as provided further in § 138.80: Individual Certificates, Fleet Certificates and Master Certificates.
(b) Requirements before issuance and renewal of COFRs. The Director will issue or renew a COFR only after NPFC receives a completed Application or request for COFR renewal, and satisfactory evidence of financial responsibility.
(c) COFRs are issued only to designated COFR Operators. Each COFR of any type is issued only in the name of the COFR Operator designated in the Application or request for COFR renewal.
(d) Form of issuance. All COFRs are issued by the Director in electronic form on NPFC's COFR program website (https://npfc.uscg.mil/cofr/default.aspx) for a term of no more than 3 years from the date of issuance.
(e) Information included in COFRs. The following information is available on NPFC's COFR program website for each COFR issued by the Director:
(1) The name of the COFR Operator;
(2) The date of COFR expiration;
(3) The COFR number;
(4) For an Individual Certificate, the name of the covered vessel, and the vessel's gross tonnage information, including the measurement system(s) used;
(5) For a Fleet Certificate, the gross tons of the largest unmanned, non-self-propelled, non-tank barge within the fleet, including the measurement systems(s) used; and
(6) For a Master Certificate, the gross tons of the largest tank vessel and largest vessel other than a tank vessel eligible for coverage by the Master Certificate, including the measurement systems(s) used.
§ 138.80 Applying for COFRs.
(a) How to apply for a COFR. To apply for a COFR of any type, the COFR Operator must—
(1) Submit, or cause to be submitted, to the Director, by one of the submission methods provided in § 138.60(c):
(i) An Application;
(A) For an Individual Certificate, list the name of the covered vessel, and the vessel's gross tonnage information, including the measurement system(s) used on the application;
(B) For a Fleet Certificate, instead of listing each individual barge, mark the box with the following statement: “This is an Application for a Fleet Certificate. The largest unmanned, non-self-propelled, non-tank barge to be covered by this Application is [INSERT APPLICABLE GROSS TONS] GT ITC and [INSERT GROSS TONNAGE] GRT”; and
(C) For a Master Certificate, instead of listing each individual vessel, mark the box with the following statement: “This is an Application for a Master Certificate. The largest tank vessel to be covered by this Application is [INSERT APPLICABLE GROSS TONS] GT ITC and [INSERT APPLICABLE GROSS TONS] GRT, as applicable. The largest vessel other than a tank vessel to be covered by this Application is [INSERT APPLICABLE GROSS TONS] GT ITC and [INSERT APPLICABLE GROSS TONS] GRT, as applicable.”
(ii) The evidence of financial responsibility using one of the guaranty methods provided in § 138.110;
(A) For a Fleet Certificate, the evidence of financial responsibility must be in the total applicable amount, determined as provided in § 138.100, for the largest unmanned, non-self-propelled, non-tank barge to be covered.
(B) For a Master Certificate, the evidence of financial responsibility must be in the total applicable amount determined as provided in § 138.100 for the largest tank vessel and largest non-tank vessel to be covered by the Master Certificate.
(iii) The agent for service of process designations required by § 138.130; and
(iv) All other supporting documentation required by this subpart.
(A) At the time of Application for a Master Certificate, the COFR Operator must submit a report to the Director, indicating: the name; previous name, if applicable; type; gross tonnage and measurement system(s) used, for each vessel covered by the Master Certificate, indicating which vessels, if any, are tank vessels. If a vessel has both a GT ITC and GRT tonnage, specify both gross tonnages.
(B) Six months after receiving a Master Certificate, and every 6 months thereafter, each COFR Operator must submit to the Director, an updated report, separately listing the vessels no longer covered by that Master Certificate. If a vessel has both a GT ITC and GRT, both gross tonnages must be specified. If a vessel has been transferred to another responsible party and the COFR Operator to whom the Master Certificate was issued ceases to be the vessel's operator, the COFR Operator must report the date and place of the transfer, and the name and contact information of the responsible party to whom the vessel was transferred. If the vessels covered by the Master Certificate have not changed from the previous report, the COFR Operator may submit an updated report that indicates no change from previous report.
(2) Pay, or cause to be paid, all fees required by § 138.120.
(b) Application deadline. The Director must receive the Application, evidence of financial responsibility, and other required supporting documentation, at least 21 days prior to the date the Certificate is required. The COFR Operator may seek an exception to the 21-day submission deadline only as provided in § 138.60(e)(3).
(c) Where to obtain Application forms. COFR Operators may create an Application using the online eCOFR web process (located at https://npfc.uscg.mil/cofr/default.aspx) or, if not using eCOFR, may obtain an “Application for Vessel Certificate of Financial Responsibility (Water Pollution)” at the same website.
(d) Requirement to verify, or sign and date, the Application. (1) The COFR Operator must complete and either verify the Application in eCOFR as provided in § 138.60(c)(1)(i) or, if not using eCOFR, sign and date the hard-copy signature page of the Application and submit the signed Application to the Director, by one of the methods specified in § 138.60(c)(1)(ii) through (iv).
(2) The Application must include the title of the person signing it.
(3) If the person signing the Application is acting under a Power of Attorney, they must include a copy of the Power of Attorney with the Application.
(e) Requirement to update Applications. The COFR Operator must report any changes to the Application to the Director in writing, no later than 5 business days after discovery of the change. The Director may require that the COFR Operator submit a revised Application and provide additional evidence of financial responsibility, and pay any additional fees required by § 138.120.
(f) Amending Fleet and Master Certificates. Before operating a barge or vessel that exceeds the maximum gross tonnage indicated on the COFR, the COFR Operator must:
(1) Submit a new or amended Application, or a written request to supplement the Application, to reflect the new maximum gross tonnages on the COFR;
(2) Unless the COFR Operator qualifies as a self-insurer at the higher total applicable amount, submit, or cause to be submitted, evidence of financial responsibility using one of the guaranty methods provided in § 138.110 to the Director, demonstrating increased coverage based on the new maximum gross tonnage; and
(3) Pay a new certification fee, as required by § 138.120.
§ 138.90 Renewing COFRs.
(a) The COFR Operator must submit a request for COFR renewal to the NPFC at least 21 days, but no earlier than 90 days, before the expiration date of the current COFR.
(b) The COFR Operator may seek an exception to the 21-day request for COFR renewal submission deadline in paragraph (a) of this section only as provided in § 138.60(e)(3).
(c) The COFR Operator must identify in the request for COFR renewal all changes to the information contained in the initial Application, including the gross ton measurement system(s) used (if not previously provided), the evidence of financial responsibility, and all other supporting documentation previously submitted to the Director, as provided in § 138.150.
§ 138.100 How to calculate a total applicable amount.
The total applicable amount is the sum of the OPA 90 applicable amount determined under paragraph (a) of this section plus the CERCLA applicable amount determined under paragraph (b) of this section.
(a) OPA 90 applicable amount. The applicable amount under OPA 90 is equal to the applicable limit of liability determined as provided in subpart B of this part.
(b) CERCLA applicable amount. The applicable amount under CERCLA is determined as follows:
(1) For a vessel over 300 gross tons carrying a hazardous substance as cargo, and for any vessel covered under § 138.110(c)(3) or (d)(2)(ii) (calculation of CERCLA applicable amounts for financial guarantors and self-insurers), the greater of $5,000,000 or $300 per gross ton.
(2) For any other vessel over 300 gross tons, the greater of $500,000 or $300 per gross ton.
(c) Amended applicable amounts. If an applicable amount determined under paragraph (a) or (b) of this section is amended by statute or regulation, the COFR Operator must establish and maintain evidence of financial responsibility in an amount equal to or greater than the amended total applicable amount, as provided in § 138.240(a).
(d) OPA 90 and CERCLA applicable amounts and limits of liability. The responsible parties are strictly, jointly and severally liable, for the costs and damages resulting from an incident or a release, but together they need only establish and maintain an amount of financial responsibility equal to the single limit of liability per incident or release. Only that portion of the evidence of financial responsibility under this subpart with respect to—
(1) OPA 90 is required to be made available by a guarantor for the costs and damages related to an incident where there is not also a release; and
(2) CERCLA is required to be made available by a guarantor for the costs and damages related to a release where there is not also an incident. A guarantor (or a self-insurer for whom the exceptions to a limitations of liability are not applicable), therefore, is not required to apply the entire amount of financial responsibility to an incident involving oil alone or a release involving a hazardous substance alone.
§ 138.110 How to establish and maintain evidence of financial responsibility.
(a) General requirement; guaranty effective date and termination date. The COFR Operator of each vessel must submit, or cause to be submitted, to the Director, the evidence of financial responsibility required by § 138.40(a) using one of the methods specified in this section.
(1) If submitted on behalf of the COFR Operator, the guarantor must provide evidence of financial responsibility to the Director.
(2) The effective and termination dates are as follows:
Table 1 to § 138.110(a)(2)—Effective and Termination Dates
Type of certificate | Effective date | Termination date
Individual Fleet | Guaranty form submission date Guaranty form submission date or date COFR Operator becomes a Responsible Party for the vessel | 30 days after the date the Director and the COFR Operator receive written notice from the guarantor that the guarantor intends to cancel the guaranty for that vessel.
Master | Guaranty form submission date or date COFR Operator becomes a Responsible Party for the vessel
(3) Termination provisions:
(i) The guarantor must specify the reason for terminating the guaranty in the notice required by this paragraph, if known.
(ii) Termination of the guaranty as to any covered vessel will not affect the liability of the guarantor in connection with an incident or release commencing or occurring prior to the effective date of the guaranty termination.
(4) If, at any time, the information contained in the evidence of financial responsibility submitted under this section changes, or there is a material change in a guarantor or self-insurer's financial position, the guarantor or COFR Operator or self-insurer (as applicable), must report the change to the Director, as provided in § 138.150.
(b) Insurance guaranty method. The COFR Operator may establish and maintain evidence of financial responsibility using the insurance guaranty method by submitting an Insurance Guaranty Form to the Director.
(1) Each form must be executed by no more than four COFR insurance guarantors accepted by the Director. A lead underwriter is considered one of the COFR insurance guarantors.
(2) The process for establishing and maintaining the acceptability of a COFR insurance guarantor is as follows:
(i) The COFR insurance guarantor must request an initial determination by the Director of the COFR insurance guarantor's acceptability to serve as a COFR insurance guarantor under this subpart, at least 90 days before the date a COFR is required, by submitting information describing the COFR insurance guarantor's structure, business practices, history, and financial strength, and such other information as may be requested by the Director.
(ii) The Director reviews the continued acceptability of COFR insurance guarantors annually. Each COFR insurance guarantor must submit updates to the initial request submitted under paragraph (b)(2)(i) of this section, annually, within 90 days after the close of the COFR insurance guarantor's fiscal year, describing any material changes to the COFR insurance guarantor's legal status, structure, business practices, history, and financial strength, since the previous year's submission, and providing such other information as may be requested by the Director.
(c) Financial guaranty method. The COFR Operator may establish and maintain evidence of financial responsibility using the financial guaranty method by submitting a Financial Guaranty Form to the Director.
(1) Each form must be executed by no more than four financial guarantors accepted by the Director, at least one of which must be a parent or affiliate of the COFR Operator. (See paragraph (g) of this section for additional requirements if more than one financial guarantor signs the form.)
(2) The process for establishing and maintaining the acceptability of a financial guarantor is as follows:
(i) The financial guarantor must comply with the self-insurance provisions in paragraph (d) of this section, and the periodic reporting requirements in paragraphs (e)(1) through (4) of this section.
(ii) The financial guarantor must also demonstrate that it maintains net worth and working capital, each in amounts equal to or greater than—
(A) The aggregate total applicable amounts, calculated for each COFR Operator vessel for which the financial guaranty is being provided, based on each such COFR Operator's vessel with the greatest total applicable amount, plus—
(B) The total applicable amount required to be demonstrated by a self-insurer under this subpart if the financial guarantor is also acting as a self-insurer.
(3) In the case of a vessel greater than 300 gross tons, calculate the CERCLA applicable amount under § 138.100(b)(1) based on a vessel carrying hazardous substances as cargo.
(d) Self-insurance method. The COFR Operator may establish and maintain evidence of financial responsibility using the self-insurance method as follows:
(1) Submit to the Director the financial statements specified in paragraphs (e)(1) through (4) of this section for the fiscal year preceding the date the COFR Operator signs the Application or request for COFR renewal.
(2) Demonstrate that the COFR Operator maintains, in the United States, working capital and net worth, each in amounts equal to or greater than the total applicable amount, calculated as follows:
(i) If the self-insurer has multiple vessels, calculate the total applicable amount based on the vessel with the greatest total applicable amount.
(ii) In the case of a vessel greater than 300 gross tons, calculate the CERCLA applicable amount under § 138.100(b)(1) based on a vessel carrying hazardous substances as cargo.
(e) Reporting requirements for self-insurers and financial guarantors. (1) Each self-insurer and financial guarantor must submit the following reports to the Director with the Application and annually thereafter, within the deadlines specified in paragraph (e)(4) of this section:
(i) Submit the self-insurer or financial guarantor's annual, current, and audited non-consolidated financial statements prepared in accordance with Generally Accepted Accounting Principles, and audited by an independent Certified Public Accountant in accordance with Generally Accepted Auditing Standards.
(ii) Accompany the financial statements with a declaration from the self-insurer or financial guarantor's chief financial officer, treasurer, or equivalent official, certifying the amount of the self-insurer or financial guarantor's current assets, and the amount of the self-insurer or financial guarantor's total assets included in the accompanying balance sheet, which are located in the United States.
(iii) If the financial statements cannot be submitted in non-consolidated form, submit a consolidated statement accompanied by an additional declaration prepared by the same Certified Public Accountant—
(A) Verifying the amount by which the total assets located in the United States exceed the self-insurer or financial guarantor's total (worldwide) liabilities, and the self-insurer or financial guarantor's current assets located in the United States exceed the self-insurer or financial guarantor's total (worldwide) current liabilities;
(B) Specifically naming the self-insurer or financial guarantor;
(C) Confirming that the amounts so verified relate only to the self-insurer or financial guarantor, apart from any parent or other affiliated entity; and
(D) Identifying the consolidated financial statement to which it applies.
(2) When the self-insurer or financial guarantor's demonstrated net worth is not at least ten times the cumulative total applicable amounts, their chief financial officer, treasurer, or equivalent official must submit to the Director with the Application and semi-annually thereafter, within the deadline specified in paragraph (e)(4) of this section, an affidavit stating that neither their working capital nor net worth fell during the first 6 months of the self-insurer or financial guarantor's current fiscal year, below the cumulative total applicable amounts.
(3) All self-insurers and financial guarantors must—
(i) Submit, upon the Director's request, additional financial information within the time specified; and
(ii) Notify the Director in writing within 5 days following the date the self-insurer or financial guarantor knows, or has reason to know, that its working capital or net worth has fallen below the total applicable amounts.
(4) All required annual financial statements and declarations must be submitted to the Director within 90 days after the close of the self-insurer or financial guarantor's fiscal year. All required semi-annual financial statements and declarations must be submitted to the Director within 30 days after the close of the applicable 6-month period. The Director will grant an extension of the time limits for submissions under this paragraph only as provided in § 138.60(e).
(5) A failure by a self-insurer or financial guarantor to timely submit to the Director any statement, data, notification, or other submission required may result in the Director denying or revoking the COFR, and may prompt enforcement action as provided under § 138.170.
(6) The Director may waive the working capital requirement for any self-insurer or financial guarantor that—
(i) Is a regulated public utility, a municipal or higher-level governmental entity, or an entity operating solely as a charitable, non-profit organization qualifying under the Internal Revenue Code (26 U.S.C. 501(c)), provided that the self-insurer or financial guarantor demonstrates in writing that the waiver would benefit a local public interest; or
(ii) Demonstrates in writing that working capital is not a significant factor in the self-insurer or financial guarantor's financial condition, in which case the self-insurer or financial guarantor's net worth in relation to the required cumulative total applicable amounts, and a history of stable operations, are the major elements considered by the Director.
(f) Other guaranty methods for establishing evidence of financial responsibility. (1) The COFR Operator may request that the Director accept a guaranty method for establishing evidence of financial responsibility that is different from one of the methods described in paragraphs (b) through (e) of this section as follows:
(i) The COFR Operator must submit the request to the Director in writing, at least 90 days prior to the date the COFR is required.
(ii) The request must describe in detail: The method proposed; the reasons why the COFR Operator does not wish to (or is unable to) use one of the methods described in paragraphs (b) through (e) of this section; and how the proposed guaranty method assures that the vessel's responsible parties have the financial ability to meet their potential liabilities under OPA 90 and CERCLA in the event of an incident or a release.
(iii) Each COFR Operator making a request under this paragraph must provide the Director a proposed guaranty form that includes all the elements described in paragraphs (g) and (h) of this section.
(2) The Director will not accept a self-insurance method other than the one described in paragraph (d) of this section. The Director also will not accept a guaranty method under this paragraph that merely deletes or alters a requirement or provision of one of the guaranty methods described in paragraphs (b) through (e) of this section (for example, one that alters the termination clause of the Insurance Guaranty).
(3) A Director's decision to accept an alternative guaranty method of establishing evidence of financial responsibility under this paragraph is final agency action.
(g) Additional rules regarding multiple guarantors. If more than one guarantor executes the relevant guaranty form, the following rules apply:
(1) If a guarantor's percentage of vertical participation is specified on the relevant guaranty form, the guarantor is subject to direct action and is liable for the payment of costs and damages under OPA 90 or CERCLA, as applicable, only in accordance with the percentage of vertical participation so specified for that guarantor.
(2) Participation in the form of layering (tiers, one in excess of another) is not permitted. Only vertical participation on a percentage basis and participation with no specified percentage allocation is acceptable.
(3) If no percentage of vertical participation is specified for a guarantor on the relevant guaranty form, the guarantor's liability is joint and several for the total of the unspecified portion.
(4) The participating guarantors must designate a lead guarantor having authority to bind all of the participating guarantors for actions required of guarantors under OPA 90 or CERCLA and this subpart, including but not limited to reporting changes in the evidence of financial responsibility as provided in § 138.150(d), receipt of source designations, advertisement of source designations and the responsible party's claims procedures, and receipt and settlement of claims.
(h) Direct action. (1) Each guarantor providing evidence of financial responsibility must submit to the Director a written acknowledgment by the guarantor that a claimant (including a claimant by right of subrogation) may assert any claim for costs or damages arising under OPA 90, CERCLA, or both, directly against the guarantor, regardless of whether the claim is asserted in an action in court or other proceeding. The guarantor must also acknowledge that, in the event a claim is asserted directly against the guarantor under OPA 90, CERCLA, or both, the guarantor may invoke only the following rights and defenses—
(i) The incident, release, or both, were caused by the willful misconduct of a responsible party for whom the guaranty was provided;
(ii) All rights and defenses, which would be available to the responsible party under OPA 90, CERCLA, or both, as applicable;
(iii) A defense that the amount of the claim, or all claims asserted with respect to the same incident or release, whether asserted in court or in any other proceeding, exceeds the amount of the guaranty, except when the guaranty is based on the gross tonnage of the vessel (instead of the statutory minimums) and the guarantor knew or should have known that the applicable tonnage certificate was incorrect (see § 138.50(f)); and
(iv) The claim is not one made under OPA 90, CERCLA, or both.
(2) Except when the guaranty is based on the gross tonnage of the vessel (instead of the statutory minimums) and the guarantor knew or should have known that the evidence of financial responsibility or applicable tonnage certificate is incorrect (see § 138.50(f)), a guarantor who provides evidence of financial responsibility under this subpart will be liable, with respect to any one incident or release, or both, as applicable, only for the amount of costs and damages specified in the evidence of financial responsibility.
(3) A guarantor will not be considered to have consented to direct action under any law other than OPA 90 or CERCLA, or to unlimited liability under any law or in any venue, solely because the guarantor has provided evidence of financial responsibility under this subpart.
(4) In the event of any finding that the liability of a guarantor under OPA 90 or CERCLA exceeds the amount of the guaranty provided under this subpart, that guaranty is considered null and void with respect to that excess.
(i) Process upon disapproval of guarantor. If the Director intends to disapprove or revoke the approval of a guarantor (for example, due to the guarantor's change in financial position), the Director will notify the COFR Operator of the need to establish new evidence of financial responsibility within a specified period.
(1) If the COFR Operator establishes, or causes to be established, new acceptable evidence of financial responsibility within the period specified by the Director in the notice, the Application if otherwise complete will be approved or the COFR will remain in effect, and the COFR Operator will not have to pay a new Application fee or certification fee.
(2) If the COFR Operator fails to establish, or cause to be established, new acceptable evidence of financial responsibility within the period specified by the Director in the notice, the Director may deny or revoke the COFR and, if revoked, the COFR Operator will have to apply for a new COFR and pay a new certification fee. The COFR Operator's failure to establish, or cause to be established, new acceptable evidence of financial responsibility within the period specified by the Director may also result in enforcement as provided under § 138.170.
§ 138.120 Fees.
(a) Fee payment methods. Each COFR Operator applying for a COFR, or requesting a COFR renewal, must pay the fees required by paragraphs (b) and (c) of this section as follows:
(1) All fees required by this section must be paid in United States dollars.
(2) For COFR Operators using eCOFR as provided under § 138.60(c)(1)(i), credit card payment is required.
(3) For COFR Operators submitting Applications and requests for COFR renewal under § 138.60(c)(1)(ii) through (iv) (email, fax, and mail submissions), the fees must be paid by a check, cashier's check, draft, or postal money order, made payable to the “U.S. Coast Guard”. Cash payments will not be accepted.
(i) For Applications and requests for COFR renewal submitted under § 138.60(c)(1)(ii) and (iii) (email and fax submissions, respectively), all fee payments must be received by the Director no later than 21 days following submission of the Application or request for COFR renewal.
(ii) For Applications and requests for COFR renewal submitted under § 138.60(c)(1)(iv) (mail submissions), all fee payments must be enclosed with the Application or request for COFR renewal.
(4) Any failure to timely pay the fees required by this section may result in COFR denial or revocation, debt collection (see 6 CFR part 11, 44 CFR part 11, and 31 CFR parts 285, and 900 through 904), and such other enforcement under § 138.170 as may be appropriate.
(b) Application fee. (1) Except as provided in paragraph (b)(2) of this section, the COFR Operator must pay a non-refundable Application fee of $200 for each Application submitted under this subpart (for each Application for one or more Individual Certificates, for a Fleet Certificate, or for a Master Certificate).
(2) An Application fee is not required when the COFR Operator submits—
(i) A request for an additional Individual Certificate under an existing Application;
(ii) A request to amend an Application;
(iii) A request for Certificate renewal; or
(iv) A request to reinstate a Certificate, if submitted within 90 days following the Certificate's revocation.
(c) Certification fees. In addition to the Application fees required by paragraph (b) of this section, each COFR Operator who submits an Application or request for COFR renewal must pay the following certification fees:
(1) $100 for each vessel listed in, or added to, an Application for one or more Individual Certificates;
(2) $100 for each Application for a Fleet Certificate or Master Certificate; and
(3) $100 for each request for renewal of an Individual Certificate, a Fleet Certificate or a Master Certificate.
(d) Fee refunds. (1) A certification fee will be refunded, upon receipt by the Director of a written request, if the Application or request for COFR renewal is denied by the Director, or if the Application is withdrawn by the COFR Operator before the Director issues the COFR.
(2) Overpayments of Application and certification fees will be refunded to the COFR Operator.
§ 138.130 Agents for Service of process.
(a) Designation of U.S. agents for service of process. Each COFR Operator and guarantor must designate on the forms submitted a person located in the United States as its U.S. agent for service of process and (in the event of an incident, a release, or both) for receipt of notices of source designation, claims presented under OPA 90, CERCLA, or both, and lawsuits brought under OPA 90, CERCLA, or both.
(b) U.S. agent for service of process acknowledgment. Each U.S. agent for service of process designated under paragraph (a) must acknowledge the agency designation in writing unless the agent has already submitted a written master (that is, blanket) agency acknowledgment to the Director showing that the agent has agreed in advance to act as the U.S. agent for service of process for the COFR Operator or guarantor in question.
(c) How to change the U.S. agent for service of process. A COFR Operator or guarantor may change a designated U.S. agent for service of process, at any time and for any reason, by submitting a new U.S. agent for service of process designation in accordance with the procedure in paragraph (a), and by causing the new U.S. agent for service of process to submit the agency acknowledgment required by paragraph (b) of this section.
(d) Replacement of unavailable U.S. agent for service of process. In the event a designated U.S. agent for service of process becomes unavailable at any time, for any reason, the COFR Operator or guarantor must designate a new U.S. agent for service of process in accordance with the procedures in paragraph (a), within 5 days of the COFR Operator or guarantor becoming aware of such unavailability. In addition, the new U.S. agent for service of process must submit to the Director the agency acknowledgment required by paragraph (b) of this section.
(e) Service on the Director. If a designated U.S. agent for service of process cannot be served, then service of process on the Director, as provided in this paragraph, will constitute valid service of process on the COFR Operator or guarantor. Service of process on the Director will not be effective unless the server—
(1) Has sent a copy of each document served on the Director to the COFR Operator or guarantor, as applicable, by registered mail, at the COFR Operator or guarantor's last known address on file with the Director;
(2) Indicates, at the time process is served upon the Director, that the purpose of the mailing is to effect service of process on the COFR Operator or guarantor; and
(3) Provides evidence acceptable to the Director at the time process is served upon the Director, that service was attempted on the designated U.S. agent for service of process but failed, stating the reasons why service on the U.S. agent for service of process was not possible, and that the document was sent to the COFR Operator or guarantor, as required by paragraph (e)(1) of this section.
§ 138.140 Application withdrawals, COFR denials and revocations.
(a) Application withdrawal. A COFR Operator, or anyone authorized to act on their behalf, may withdraw an Application at any time prior to issuance of the COFR.
(b) Application denials and COFR revocations. The Director may deny an Application or revoke a COFR, and the United States may initiate enforcement under § 138.170, for any failure to comply with the requirements of this subpart, including—
(1) If the COFR Operator, or other person acting on the COFR Operator's behalf, makes a false statement in, or in connection with, any submission required by this subpart;
(2) If the COFR Operator, or other person acting on the COFR Operator's behalf, fails to establish or maintain acceptable evidence of financial responsibility, as required by this subpart;
(3) If the COFR Operator fails to pay the Application and certification fees required by § 138.120;
(4) If the COFR Operator or guarantor fails to designate and maintain a U.S. agent for service of process as required by § 138.130;
(5) If the COFR Operator, or other person acting on the COFR Operator's behalf, fails to comply with, or respond to, lawful inquiries, regulations, or orders of the U.S. Coast Guard pertaining to the activities subject to this subpart;
(6) If the COFR Operator, or other person acting on the COFR Operator's behalf, fails to timely report information required to be reported to the Director under this subpart, including failing to timely submit to the Director statements, data, financial information, notifications, affidavits, or other submissions required by this subpart; or
(7) If the Director obtains information indicating that the Application should be denied or that a new COFR is required (for example, a permanent vessel transfer, new COFR Operator, vessel renaming, guaranty termination, disapproval of a guarantor).
(c) Procedure for reinstating COFRs following termination of guaranties. If a COFR is revoked by the Director under paragraph (b)(2) of this section based on the expiration of 30 days following the date the Director receives a guarantor's notice of termination as provided under §§ 138.110(a)(3) and 138.150(d), the Director may reinstate the COFR if the guarantor promptly notifies the Director following the revocation that the guarantor rescinded the termination and that there was no gap in guarantor coverage.
(d) Notice to COFR Operator of intent to deny an Application or revoke a COFR. If the Director obtains information indicating that an Application should be denied or that a COFR should be revoked for reasons that the COFR Operator may not be aware of, the Director will notify the COFR Operator, in writing, stating the reason for the intended action.
(1) A notice from the Director that an Application is incomplete will be considered a denial unless the Application is completed by the COFR Operator within the period specified in the notice. A COFR subject to revocation remains valid until the COFR is revoked as provided in § 138.140(d)(2) and (3).
(2) If the Director issues a notice of intent to deny an Application or revoke a COFR due to a violation under paragraph (b) of this section, the COFR Operator may demonstrate compliance to the Director in writing by no later than the date specified by the Director in the notice. If the COFR Operator demonstrates compliance by that date, the Application will remain under consideration, and any current COFR will remain in effect, unless and until the Director issues a written decision denying the Application or revoking the COFR, as applicable. Otherwise, the Application denial or COFR revocation is effective as of the date specified by the notice.
(3) The denial of an Application or revocation of a COFR does not terminate the guaranty.
(e) Request for reconsideration. (1) A COFR Operator may ask the Director to reconsider a denial of the COFR Operator's Application or the revocation of a COFR as follows:
(i) The COFR Operator must submit the request for reconsideration, in writing, to the Director no later than 21 days after the date of the denial or revocation.
(ii) The submission must state the COFR Operator's reasons for requesting reconsideration and include all supporting documentation.
(2) A decision by the Director on reconsideration of an Application denial or a COFR revocation is final agency action. If the Director does not issue a written decision on the request for reconsideration within 30 days after its submission, the request for reconsideration will be deemed to have been denied, and the Application denial or COFR revocation will be deemed to have been affirmed as a matter of final agency action. Unless the Director issues a decision reversing the revocation, the COFR revocation remains in effect.
(f) Duty to remedy violations. If the COFR for a vessel expires or is revoked while the vessel is located in the navigable waters, at any port or other place subject to the jurisdiction of the United States, or in the Exclusive Economic Zone, the COFR Operator and the vessel's other responsible parties will be deemed in violation of this subpart. In such event, the COFR Operator or, if unavailable or no longer operating the vessel, the vessel's current responsible parties, must notify the Director within 24 hours, by email or other electronic means. The notice must include the information required by § 138.150(b) and must establish new evidence of financial responsibility, designate a new COFR Operator if applicable, and cure any other violation of this subpart.
§ 138.150 Reporting requirements.
(a) Report changes of submitted information. When there is a change in any of the facts contained in an Application, a request for COFR renewal, evidence of financial responsibility, or other submission made under this subpart, the change must be reported, in writing, to the Director. The reports required by this section may be submitted with, but are in addition to, other submissions required by this subpart (for example, Applications, requests for COFR renewal, semi-annual and annual financial reports, Master Certificate reports).
(b) A 21-day prior reporting requirement of permanent vessel transfers and other changes requiring issuance of a new COFR. Current COFR Operators of vessels, and owners or operators of vessels not currently in U.S. navigable waters or the U.S. Exclusive Economic Zone, must report to the Director, and (if applicable) to the guarantor, the following information, no later than 21 business days before the new COFR is required:
(1) The number of the current COFR;
(2) The name of the covered vessel;
(3) The type of change planned;
(4) The date the change will take place;
(5) The reason for the change;
(6) For a vessel that will be located in U.S. navigable waters or U.S. Exclusive Economic Zone on the date the change is scheduled to take place, where the vessel will be located on that date (for example, name and location of port);
(7) For a vessel name change, the vessel's new legal name;
(8) For the planned transfer of a vessel to a new responsible party, and even if the transferee's intent is to scrap or otherwise dispose of the vessel, the name and contact information of the responsible party to whom the vessel is being transferred;
(9) For a change of COFR Operator, the name and contact information of the person who will replace the COFR Operator; and
(10) Any other changes in the information previously submitted to ensure the information on record at the NPFC is current.
(c) Three-day prior reporting of changes not requiring issuance of a new COFR. In addition to the prior reporting required by paragraph (b) of this section, the COFR Operator must report any change to information contained in a submission to the Director that does not require issuance of a new COFR, by no later than 3 business days before implementing the change, including, but not limited to: Changes to the U.S. agent for service of process (other than termination), a change of a non-operator vessel owner, new contact information, and changes in vessel particulars (for example, flag, measurement, type, and scheduled vessel scrapping).
(d) Reporting by guarantors. Each guarantor (or, if there are multiple guarantors, each lead guarantor) must give the Director 30 days notice before terminating a guaranty as provided in § 138.110(a)(3), explaining the reason for the intended termination, once known, or should have known, in the ordinary course of business.
(e) Enforcement; deadline exceptions. A failure to timely submit the reports required by this section may result in enforcement actions as provided in § 138.170. Exceptions to the reporting deadlines will only be granted as provided in § 138.60(e).
§ 138.160 Non-owning COFR Operator's responsibility for identification.
(a) Each COFR Operator of a vessel with a COFR, other than an unmanned, non-self-propelled barge, who is not also an owner of the vessel must ensure that the original or a legible copy of the vessel's demise charter-party (or other written document on the owner's letterhead, signed by the vessel owner, which specifically identifies the COFR Operator named on the COFR) is maintained on board the vessel.
(b) The demise charter-party or other document required by paragraph (a) of this section must be presented, upon request, for examination and copying, to the Director or other United States Government official.
§ 138.170 Enforcement.
(a) Applicability. Any person who fails to comply with the requirements of this subpart, including the reporting requirements in § 138.150, may be subject to enforcement as provided in this section, including if—
(1) The COFR Operator fails to maintain acceptable evidence of financial responsibility as required;
(2) The name of a covered vessel is changed without reporting the change to the Director as required in § 138.150;
(3) The COFR Operator ceases, for any reason, to be an operator of a covered vessel, including when a vessel is scrapped or transferred to a new owner or operator, and a new Application and report have not been submitted to the Director as required by §§ 138.80 and 138.150; or
(4) The COFR Operator fails to maintain a U.S. agent for service of process.
(b) Non-compliance. During a period of non-compliance with this subpart, all use by the vessel of the navigable waters of the United States, of any port or other place subject to the jurisdiction of the United States, or of the Exclusive Economic Zone to transship or lighter oil destined for a place subject to the jurisdiction of the United States, is forbidden.
(c) Withholding and revoking vessel clearance. The Secretary of the Department of Homeland Security will withhold or revoke the clearance required by 46 U.S.C. 60105 of any vessel subject to this subpart that does not have a COFR or for which the evidence of financial responsibility required has not been established and maintained.
(d) Denying vessel entry, and detention. The U.S. Coast Guard may deny entry to any port or other place in the United States or the navigable waters, and may detain at any port or other place in the United States in which it is located, any vessel subject to this subpart, which does not have a COFR or for which the evidence of financial responsibility required by this subpart has not been established and maintained.
(e) Seizure and forfeiture. In accordance with OPA 90, any vessel subject to this subpart which is found in the navigable waters without a COFR, or for which the necessary evidence of financial responsibility has not been established and maintained as required, is subject to seizure by, and forfeiture to, the United States.
(f) Administrative and judicial penalties and other relief. (1) Any person who fails to comply with the requirements of this subpart or the evidence of financial responsibility requirements of OPA 90, CERCLA, or both, including a failure to comply with the reporting requirements in § 138.150, is subject to civil administrative and judicial penalties under OPA 90 and CERCLA, as applicable. In addition, under OPA 90, the Attorney General may secure such relief as may be necessary to compel compliance with OPA 90 and this subpart, including termination of operations.
(2) Under 18 U.S.C. 1001, any person making a false statement in, or in connection with, a submission under OPA 90 or CERCLA or this subpart is subject to prosecution.
(3) Any person who fails to timely pay the fees required by § 138.120 or any other amounts due under OPA 90 or CERCLA or this subpart may also be subject to Federal debt collection under 6 CFR part 11, 44 CFR part 11 and 31 CFR parts 285, and 900 through 904.
Subpart B OPA 90 Limits of Liability (Vessels, Deepwater Ports and Onshore Facilities)
Source: 80 FR 72355, Nov. 19, 2015, unless otherwise noted.
§ 138.200 Scope.
This subpart sets forth the limits of liability under Title I of the Oil Pollution Act of 1990, as amended (33 U.S.C. 2701, et seq.) (OPA 90), for vessels, deepwater ports, and onshore facilities, as adjusted under OPA 90 (33 U.S.C. 2704(d)). This subpart also sets forth the method and procedure the Coast Guard uses to periodically adjust the OPA 90 limits of liability by regulation under OPA 90 (33 U.S.C. 2704(d)(4)), to reflect significant increases in the Consumer Price Index (CPI), and to update the limits of liability when they are amended by statute. In addition, this subpart cross-references the U.S. Department of the Interior regulation setting forth the OPA 90 limit of liability applicable to offshore facilities, as adjusted under OPA 90 (33 U.S.C. 2704(d)(4)) to reflect significant increases in the CPI.
§ 138.210 Applicability.
This subpart applies to you if you are a responsible party for a vessel, a deepwater port, or an onshore facility (including, but not limited to, motor vehicles, rolling stock and onshore pipelines), unless your liability is unlimited under OPA 90 (33 U.S.C. 2704(c)).
§ 138.220 Definitions.
(a) As used in this subpart, the following terms have the meanings set forth in OPA 90 (33 U.S.C. 2701): deepwater port, facility, gross ton, liability, oil, offshore facility, onshore facility, responsible party, tank vessel, and vessel.
(b) As used in this subpart—
Annual CPI-U means the annual “Consumer Price Index—All Urban Consumers, Not Seasonally Adjusted, U.S. City Average, All items, 1982-84=100”, published by the U.S. Department of Labor, Bureau of Labor Statistics.
Current period means the year in which the Annual CPI-U was most recently published by the U.S. Department of Labor, Bureau of Labor Statistics.
Director, NPFC means the person in charge of the U.S. Coast Guard, National Pollution Funds Center (NPFC), or that person's authorized representative.
Edible oil tank vessel means a tank vessel referred to in OPA 90 (33 U.S.C. 2704(c)(4)(A)).
Oil spill response vessel means a tank vessel referred to in OPA 90 (33 U.S.C. 2704(c)(4)(B)).
Previous period means the year in which the previous limit of liability was established, or last adjusted by statute or regulation, whichever is later.
Single-hull means the hull of a tank vessel that is constructed or adapted to carry, or that carries, oil in bulk as cargo or cargo residue, that is not a double hull as defined in 33 CFR part 157. Single-hull includes the hull of any such tank vessel that is fitted with double sides only or a double bottom only.
§ 138.230 Limits of liability.
(a) Vessels. (1) The OPA 90 limits of liability for tank vessels, other than edible oil tank vessels and oil spill response vessels, are—
(i) For a single-hull tank vessel greater than 3,000 gross tons, the greater of $4,000 per gross ton or $29,591,300;
(ii) For a tank vessel greater than 3,000 gross tons, other than a single-hull tank vessel, the greater of $2,500 per gross ton or $21,521,000;
(iii) For a single-hull tank vessel less than or equal to 3,000 gross tons, the greater of $4,000 per gross ton or $8,070,400; and
(iv) For a tank vessel less than or equal to 3,000 gross tons, other than a single-hull tank vessel, the greater of $2,500 per gross ton or $5,380,300.
(2) The OPA 90 limits of liability for any vessel other than a vessel listed in paragraph (a)(1) of this section, including for any edible oil tank vessel and any oil spill response vessel, are the greater of $1,300 per gross ton or $1,076,000.
(b) Deepwater ports. (1) The OPA 90 limit of liability for any deepwater port, including for any component pipelines, other than a deepwater port listed in paragraph (b)(2) of this section, is $725,710,800;
(2) The OPA 90 limits of liability for deepwater ports with limits of liability established by regulation under OPA 90 (33 U.S.C. 2704(d)(2)), including for any component pipelines, are—
(i) For the Louisiana Offshore Oil Port (LOOP), $110,332,600; and
(ii) [Reserved]
(c) Onshore facilities. The OPA 90 limit of liability for onshore facilities, including, but not limited to, motor vehicles, rolling stock and onshore pipelines, is $725,710,800.
(d) Offshore facilities. The OPA 90 limit of liability for offshore facilities other than deepwater ports, including for any offshore pipelines, is set forth at 30 CFR 553.702.
[80 FR 72355, Nov. 19, 2015, as amended at 84 FR 39974, Aug. 13, 2019; 87 FR 78864, Dec. 23, 2022]
§ 138.240 Procedure for updating limits of liability to reflect significant increases in the Consumer Price Index (Annual CPI-U) and statutory changes.
(a) Update and publication. The Director, NPFC, will periodically adjust the limits of liability set forth in § 138.230(a) through (c) to reflect significant increases in the Annual CPI-U, according to the procedure for calculating limit of liability inflation adjustments set forth in paragraphs (b)-(d) of this section, and will publish the inflation-adjusted limits of liability and any statutory amendments to those limits of liability in the Federal Register as amendments to § 138.230. Updates to the limits of liability under this paragraph are effective on the 90th day after publication in the Federal Register of the amendments to § 138.230, unless otherwise specified by statute (in the event of a statutory amendment to the limits of liability) or in the Federal Register notice amending § 138.230.
(b) Formula for calculating a cumulative percent change in the Annual CPI-U. (1) The Director, NPFC, calculates the cumulative percent change in the Annual CPI-U from the year the limit of liability was established, or last adjusted by statute or regulation, whichever is later (i.e., the previous period), to the most recently published Annual CPI-U (i.e., the current period), using the following escalation formula:
Percent change in the Annual CPI-U = [(Annual CPI-U for Current Period−Annual CPI-U for Previous Period) ÷ Annual CPI-U for Previous Period] × 100.
(2) The cumulative percent change value calculated using the formula in paragraph (b)(1) of this section is rounded to one decimal place.
(c) Significance threshold. Not later than every three years from the year the limits of liability were last adjusted for inflation, the Director, NPFC, will evaluate whether the cumulative percent change in the Annual CPI-U since that date has reached a significance threshold of 3 percent or greater. For any three-year period in which the cumulative percent change in the Annual CPI-U is less than 3 percent, the Director, NPFC, will publish a notice of no inflation adjustment to the limits of liability in the Federal Register. If this occurs, the Director, NPFC, will recalculate the cumulative percent change in the Annual CPI-U since the year in which the limits of liability were last adjusted for inflation each year thereafter until the cumulative percent change equals or exceeds the threshold amount of 3 percent. Once the 3-percent threshold is reached, the Director, NPFC, will increase the limits of liability, by regulation using the procedure set forth in paragraph (a) of this section, for all source categories (including any new limit of liability established by statute or regulation since the last time the limits of liability were adjusted for inflation) by an amount equal to the cumulative percent change in the Annual CPI-U from the year each limit was established, or last adjusted by statute or regulation, whichever is later. Nothing in this paragraph shall prevent the Director, NPFC, in the Director's sole discretion, from adjusting the limits of liability for inflation by regulation issued more frequently than every three years.
(d) Formula for calculating inflation adjustments. The Director, NPFC, calculates adjustments to the limits of liability in § 138.230 for inflation using the following formula:
New limit of liability = Previous limit of liability + (Previous limit of liability × percent change in the Annual CPI-U calculated under paragraph (b) of this section), then rounded to the closest $100.
SUBCHAPTER N OUTER CONTINENTAL SHELF ACTIVITIES
PART 140 GENERAL
Authority: 43 U.S.C. 1333, 1348, 1350, 1356; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 78-160, 47 FR 9376, Mar. 4, 1982, unless otherwise noted.
Subpart A General
§ 140.1 Purpose.
This subchapter is intended to promote safety of life and property on Outer Continental Shelf (OCS) facilities, vessels, and other units engaged in OCS activities, protect the marine environment, and implement the Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.), as amended by the Outer Continental Shelf Lands Act Amendments of 1978 (Pub. L. 95-372, 92 Stat. 629).
§ 140.3 Applicability.
Unless otherwise stated, this subchapter applies to OCS facilities, vessels, and other units engaged in OCS activities as the term “OCS activities” is defined in § 140.10. This subchapter does not apply to pipelines and deepwater ports (as the term “deepwater port” is defined in section 3(10) of the Deepwater Port Act of 1974 (33 U.S.C. 1502)). The regulations in this subchapter (parts 140 through 147) have preemptive effect over state or local regulations in the same field.
[CGD 78-160, 47 FR 9376, Mar. 4, 1982, as amended by USCG-2012-0196, 81 FR 48242, July 22, 2016]
§ 140.4 Relationship to other law.
(a) Design and equipment requirements of this subchapter for OCS facilities, including mobile offshore drilling units in contact with the seabed of the OCS for exploration or exploitation of subsea resources, are in addition to the regulations and orders of the U.S. Geological Survey applicable to those facilities.
(b) Any apparent conflict between the application of any requirement of this subchapter and any regulation or order of the U.S. Geological Survey should immediately be brought to the attention of the Officer in Charge, Marine Inspection.
(c) This subchapter does not establish design requirements for fixed OCS facilities or regulate drilling or production equipment on any OCS facility or attending vessel, except for matters affecting navigation or workplace safety or health.
§ 140.5 Exemptions during construction.
The Officer in Charge, Marine Inspection, may exempt any unit under construction from any requirements of this subchapter that would be impracticable or unreasonable to apply during construction or erection of the unit.
§ 140.7 Incorporation by reference.
(a) Certain material is incorporated by reference into this subchapter with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG-ENG-4), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593-7509, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(b) American National Standards Institute (ANSI), 25 West 43rd Street, New York, NY 10036, 212-642-4900, https://www.ansi.org.
(1) ANSI A10.14-1975, Requirements for Safety Belts, Harnesses, Lanyards, Lifelines, and Drop Lines for Construction and Industrial Use, IBR approved for § 142.42(b).
(2) ANSI/UL 1123-1987, Standard for Marine Buoyant Devices, IBR approved for § 143.405(a).
(3) ANSI Z41-1983, American National Standard for Personal Protection-Protective Footwear, IBR approved for § 142.33(a) and (b).
(4) ANSI Z87.1-1979, Practice for Occupational and Educational Eye and Face Protection, IBR approved for § 142.27(a) and (c).
(5) ANSI Z88.2-1980, Practices for Respiratory Protection, IBR approved for § 142.39(a) through (c).
(6) ANSI Z89.1-1981, Safety Requirements for Industrial Head Protection, IBR approved for § 142.30(a) and (b).
(c) International Maritime Organization (IMO) Publishing, 4 Albert Embankment, London SE1 7SR, United Kingdom, +44 (0)20 7735 7611, http://www.imo.org.
(1) IMO Assembly Resolution A.414 (XI), Code for Construction and Equipment of Mobile Offshore Drilling Units, IBR approved for §§ 143.207(c) and 146.205(c).
(2) [Reserved]
(d) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617-770-3000, http://www.nfpa.org.
(1) NFPA 10, Standard for Portable Fire Extinguishers, 2010 Edition, effective December 5, 2009, IBR approved for § 145.01(b).
(2) [Reserved]
[USCG-2012-0196, 81 FR 48242, July 22, 2016]
§ 140.10 Definitions.
As used in this subchapter:
Act means the Outer Continental Shelf Lands Act of 1953 (43 U.S.C. 1331 et seq.), as amended by the Outer Continental Shelf Lands Act Amendments of 1978 (Pub. L. 95-372).
Approved means approved by the Commandant, unless otherwise indicated.
Attending vessel means a vessel which is moored close to and readily accessible from an OCS facility for the purpose of providing power, fuel, or other services to the operation being conducted on the facility.
Bureau of Safety and Environmental Enforcement inspector or BSEE inspector means an individual employed by the Bureau of Safety and Environmental Enforcement who inspects fixed OCS facilities on behalf of the Coast Guard to determine whether the requirements of this subchapter are met.
Commandant means Commandant of the Coast Guard or that person's authorized representative.
Constructed means the date—
(1) The vessel's keel was laid; or
(2) Construction identifiable with the vessel or facility began and assembly of that vessel or facility commenced comprising of 50 metric tons or at least 1 percent of the estimated mass of all structural material, whichever is less.
Development means those activities which take place following discovery of minerals in paying quantities, including, but not limited to, geophysical activity, drilling, and platform construction, and which are for the purpose of ultimately producing the minerals discovered.
District Commander means an officer who commands a Coast Guard District described in part 3 of this chapter or that person's authorized representative.
Exploration means the process of searching for minerals, including, but not limited to, (1) geophysical surveys where magnetic, gravity, seismic, or other systems are used to detect or imply the presence of such minerals, and (2) any drilling, whether on or off known geological structures, including the drilling of a well in which a discovery of oil or natural gas in paying quantities is made and the drilling of any additional delineation well after the discovery which is needed to delineate any reservoir and to enable the lessee to determine whether to proceed with development and production.
Fixed OCS facility means a bottom founded OCS facility permanently attached to the seabed or subsoil of the OCS, including platforms, guyed towers, articulated gravity platforms, and other structures.
Floating OCS facility means a buoyant OCS facility securely and substantially moored so that it cannot be moved without a special effort. This term includes tension leg platforms and permanently moored semisubmersibles or shipshape hulls but does not include mobile offshore drilling units and other vessels.
Investigating officer means a person assigned by the Commandant, a District Commander, or an Officer in Charge, Marine Inspection, to conduct an investigation of an accident, casualty, or other incident.
Manned facility means an OCS facility on which people are routinely accommodated for more than 12 hours in successive 24 hour periods.
Manned platform means a fixed OCS facility on which people are routinely accommodated for more than 12 hours in successive 24 hour periods.
Marine inspector means a person designated as such by an Officer in Charge, Marine Inspection, to perform inspections of units to determine whether or not the requirements of laws administered by the Coast Guard and of Coast Guard regulations are met.
Minerals includes oil, gas, sulphur, geopressured-geothermal and associated resources, and all other minerals which are authorized by an Act of Congress to be produced from “public lands” as defined in section 103 of the Federal Lands Policy and Management Act of 1976 (43 U.S.C. 1702(e)).
Mobile offshore drilling unit or MODU means a vessel, other than a public vessel of the United States, capable of engaging in drilling operations for exploration or exploitation of subsea resources.
Officer in Charge, Marine Inspection means a person who commands a Marine Inspection Zone described in part 3 of this chapter and who is immediately responsible for the performance of duties with respect to inspections, enforcement, and administration of regulations governing units.
Operator means—(1) In the case of a vessel, a charterer by demise or any other person who is responsible for the operation, manning, victualing, and supplying of the vessel; or
(2) In the case of an OCS facility, the operator as defined in 30 CFR 250.2(gg).
Outer Continental Shelf or OCS means all submerged lands lying seaward and outside of the area of “lands beneath navigable waters” as defined in section 2(a) of the Submerged Lands Act (43 U.S.C. 1301(a)) and of which the subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.
OCS activity means any offshore activity associated with exploration for, or development or production of, the minerals of the Outer Continental Shelf.
OCS facility means any artificial island, installation, or other device permanently or temporarily attached to the subsoil or seabed of the Outer Continental Shelf, erected for the purpose of exploring for, developing, or producing resources therefrom, or any such installation or other device (other than a ship or vessel) for the purpose of transporting such resources. The term includes mobile offshore drilling units when in contact with the seabed of the OCS for exploration or exploitation of subsea resources. The term does not include any pipeline or deepwater port (as the term “deepwater port” is defined in section 3(10) of the Deepwater Port Act of 1974 (33 U.S.C. 1502)).
Owner means a person holding title to or, in the absence of title, other indicia of ownership of a unit; however, this does not include a person who holds indicia of ownership primarily to protect a security interest in the unit and does not participate in the management or operation of the unit.
Person means an individual, association, partnership, consortium, joint venture, private, public, or municipal firm or corporation, or a government entity.
Person in charge means the master or other individual designated as such by the owner or operator under § 146.5 of this subchapter or 46 CFR 109.107.
Personnel means individuals who are employed by leaseholders, permit holders, operators, owners, contractors, or subcontractors and who are on a unit by reason of their employment.
Production means those activities which take place after the successful completion of any means for the removal of minerals, including, but not limited to, such removal, field operations, transfer of minerals to shore, operation monitoring, maintenance, and workover.
Rebuilt means having had substantial alteration or reconstruction of the hull or principal structural component.
Standby vessel means a vessel meeting the requirements of part 143, subpart E, of this chapter and specifically designated in an Emergency Evacuation Plan under § 146.140 or § 146.210 of this chapter to provide rapid evacuation assistance in the event of an emergency.
Unit means any OCS facility, vessel, rig, platform, or other vehicle or structure, domestic or foreign.
Unmanned facility means an OCS facility, other than a floating facility or mobile offshore drilling unit, which is not a manned facility even though it may be continuously serviced by an attending vessel.
Unmanned platform means a fixed, bottom-founded OCS facility which is not a manned facility even though it may be continuously serviced by an attending vessel.
Vessel means every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on water.
[CGD 78-160, 47 FR 9376, Mar. 4, 1982, as amended by CGD 79-077, 51 FR 25059, July 10, 1986; CGD 84-098b, 54 FR 21571, May 18, 1989; USCG-2001-9045, 67 FR 5916, Feb. 7, 2002; USCG-2011-0257, 76 FR 31837, June 2, 2011; USCG-2013-0797, 79 FR 36405, June 27, 2014; USCG-2012-0850, 80 FR 16990, Mar. 31, 2015]
§ 140.15 Equivalents and approved equipment.
(a) The use of alternate equipment or procedures for those specified in this subchapter may be permitted by an Officer in Charge, Marine Inspection, to the extent and upon conditions as will insure a degree of safety comparable to or greater than that provided by the minimum standards in this subchapter.
(b) Where equipment in this subchapter is required to be of an approved type, the equipment requires the specific approval of the Commandant. Approvals are published in the Federal Register and COMDTINST M16714.3 (Series) Equipment List, available from Coast Guard Headquarters. Contact Commandant (CG-ENG), Attn: Office of Design and Engineering Standards, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509.
(c) Specifications for certain items required to be of an approved type are contained in 46 CFR parts 160 through 164.
[CGD 78-160, 47 FR 9376, Mar. 4, 1982, as amended at CGD 88-052, 53 FR 25121, July 1, 1988; CGD 96-026, 61 FR 33665, June 28, 1996; USCG-2010-0351, 75 FR 36283, June 25, 2010; USCG-2014-0410, 79 FR 38434, July 7, 2014]
§ 140.20 Delegations.
(a) Each District Commander is responsible for the administration and enforcement of the regulations in this subchapter within that person's assigned district.
(b) Under the general superintendence of the District Commander, the Officer in Charge, Marine Inspection, is delegated authority to administer and enforce the regulations in this subchapter.
(c) Authority delegated under this section may be redelegated as necessary by the delegate.
§ 140.25 Appeals.
(a) Any person directly affected by an action or decision of an Officer in Charge, Marine Inspection, under the Act or the regulations in this subchapter may request reconsideration of that action or decision. If still dissatisfied, that person may appeal the action or decision of the Officer in Charge, Marine Inspection, within 30 days to the District Commander of the District in which the action was taken or the decision made. The District Commander issues a decision after reviewing the appeal submitted under this paragraph.
(b) Any person not satisfied with the decision of a District Commander may appeal that decision within 30 days to the Commandant, who issues a ruling after reviewing the appeal submitted under this paragraph. Rulings of the Commandant constitute final agency action.
(c) An appeal to the District Commander or Commandant:
(1) Must be made in writing, except in an emergency when an oral appeal may be accepted;
(2) Must be submitted to the District Commander of the District in which the action was taken or the decision made;
(3) Must describe the decision or action being appealed;
(4) Must state the reasons why the action or decision should be set aside or modified; and
(5) May contain any supporting documents and evidence that the appellant wishes to have considered.
(d) Pending determination of any appeal, the action or decision appealed remains in effect, unless suspended by the District Commander to whom the appeal was made or by the Commandant.
§ 140.30 Judicial review.
(a) Nothing in this subchapter shall be construed to prevent any interested party from seeking judicial review as authorized by law.
(b) Judicial review of the regulations in this subchapter, or any final ruling or order of the Commandant or that person's delegate pursuant to the Act or the regulations in this subchapter, is governed by the judicial review provisions of section 23 of the Act (43 U.S.C. 1349).
§ 140.35 Sanctions.
(a) Any person who fails to comply with:
(1) Any provision of the Act;
(2) Any regulation in this subchapter; or
(3) Any order issued under the Act or the regulations in this subchapter by the Commandant, a District Commander, or an Officer in Charge, Marine Inspection, after notice of the failure and after expiration of any reasonable period allowed for corrective action, shall be liable for a civil penalty for each day of the continuance of the failure.
(b) Any person who knowingly and willfully:
(1) Violates any provision of the Act;
(2) Violates any regulation in this subchapter designed to protect health, safety, or the environment;
(3) Violates any order of the Commandant, District Commander, or Officer in Charge, Marine Inspection, issued under the Act or the regulations in this subchapter that is designed to protect health, safety, or the environment;
(4) Makes any false statement, representation, or certification in any application, record, report, or other document filed or required to be maintained under the Act or the regulations in this subchapter;
(5) Falsifies, tampers with, or renders inaccurate any monitoring device or method of record required to be maintained under this Act or the regulations in this subchapter; or
(6) Reveals any data or information required to be kept confidential by the Act shall, upon conviction, be punished by a fine of not more than $100,000, or by imprisonment for not more than ten years, or both. Each day that a violation under paragraph (b)(1), (b)(2), or (b)(3) of this section continues, or each day that any monitoring device or data recorder remains inoperative or inaccurate because of any activity described in paragraph (b)(5) of this section, constitutes a separate violation.
(c) Whenever a corporation or other entity is subject to prosecution under paragraph (b) of this section, any officer or agent of the corporation or entity who knowingly and willfully authorized, ordered, or carried out the prescribed activity shall be subject to the same fines or imprisonment, or both, as provided for under paragraph (b) of this section.
(d) The penalties prescribed in this section are concurrent and cumulative and the exercise of one does not preclude the exercise of the others. Further, the penalties prescribed in this section are in addition to any other penalties afforded by any other law or regulation.
[CGD 78-160, 47 FR 9376, Mar. 4, 1982, as amended by CGD 96-052, 62 FR 16703, Apr. 8, 1997]
§ 140.40 Processing penalty cases.
Apparent violations of the regulations in this subchapter are processed in accordance with subpart 1.07 of 33 CFR part 1 on civil and criminal penalty proceedings, except as follows:
(a) The District Commander refers civil penalty cases to the Secretary of the Interior, or that person's delegate, who, under the Act, assesses, collects, and compromises civil penalties.
(b) If a possible violation investigated by the Coast Guard carries both a civil and a criminal penalty, the District Commander determines whether to refer the case to the U.S. Attorney for criminal prosecution or to the Secretary of the Interior, or that person's delegate, for civil penalty proceedings.
(c) When the U.S. Attorney declines to institute criminal proceedings, the District Commander decides whether to refer the case to the Secretary of the Interior, or that person's delegate, for civil penalty proceedings or to close the case.
Subpart B Inspections
§ 140.101 Inspection by Coast Guard marine inspectors or Bureau of Safety and Environmental Enforcement inspectors.
(a) Each unit engaged in OCS activities is subject to inspection by the Coast Guard.
(b) On behalf of the Coast Guard, each fixed OCS facility engaged in OCS activities is subject to inspection by the Bureau of Safety and Environmental Enforcement (BSEE).
(c) Under the direction of the Officer in Charge, Marine Inspection, Coast Guard marine inspectors may inspect units engaged in OCS activities, and BSEE inspectors may inspect fixed OCS facilities, to determine whether the requirements of this subchapter are met. These inspections may be conducted with or without advance notice at any time deemed necessary by the Officer in Charge, Marine Inspection, or BSEE.
(d) As part of an inspection, a Coast Guard marine inspector or a BSEE inspector may review records and require and observe the conduct of emergency drills and other tests and procedures as may be necessary to demonstrate to that person's satisfaction that the unit and its equipment are in full compliance with applicable Coast Guard regulations. The Coast Guard marine inspector or the BSEE inspector consults with the person in charge of the unit before requiring a drill or other test or procedure to be conducted to minimize disruption of unit activities and risk to life or property.
(e) Coast Guard inspections of foreign units recognize valid international certificates accepted by the United States, including Safety of Life at Sea (SOLAS), Loadline, and Mobile Offshore Drilling Unit (MODU) Code certificates for matters covered by the certificates, unless there are clear grounds for believing that the condition of the unit or its equipment does not correspond substantially with the particulars of the certificate.
(f) Coast Guard marine inspectors conduct an initial inspection of each fixed OCS facility to determine whether the facility is in compliance with the requirements of this subchapter.
[CGD 78-160, 47 FR 9376, Mar. 4, 1982, as amended by CGD 84-098a, 53 FR 18980, May 26, 1988; USCG-2001-9045, 67 FR 5916, Feb. 7, 2002; USCG-2011-0257, 76 FR 31837, June 2, 2011; USCG-2013-0797, 79 FR 35405, June 27, 2014]
§ 140.103 Annual inspection of fixed OCS facilities.
(a) The owner or operator of each fixed OCS facility shall ensure that the facility is inspected, at intervals not to exceed 12 months, to determine whether the facility is in compliance with the requirements of this subchapter.
(b) Except for initial inspections under § 140.101(f), inspections by Coast Guard marine inspectors and Bureau of Safety and Environmental Enforcement (BSEE) inspectors do not meet the requirements for an inspection under paragraph (a) of this section.
(c) Except for initial inspections under § 140.101(f), the results of the inspection under paragraph (a) of this section must be recorded on form CG-5432. Forms CG-5432 may be obtained from the Officer in Charge, Marine Inspection. A copy of the completed form must be kept for 2 years after the inspection under paragraph (a) of this section is conducted and the form made available to the Coast Guard and BOEMRE on request. For manned fixed OCS facilities, the copy of the completed form must be kept on the facility. For unmanned fixed OCS facilities, the copy of the completed form must be kept either at the nearest manned fixed OCS facility or, if there is no manned fixed OCS facility in the area, at the nearest field office of the owner or operator. In addition, the owner or operator must submit, to the appropriate BSEE District office, a copy of each completed form CG-5432 that indicates outstanding deficiencies or hazards, within 30 days after completion of the inspection.
[CGD 84-098a, 53 FR 18980, May 26, 1988, as amended by USCG-2001-9045, 67 FR 5916, Feb. 7, 2002; USCG-2011-0257, 76 FR 31837, June 2, 2011; USCG-2013-0797, 79 FR 36405, June 27, 2014]
§ 140.105 Correction of deficiencies and hazards.
(a) Lifesaving and fire fighting equipment which is found defective during an inspection by a Coast Guard marine inspector or a Bureau of Safety and Environmental Enforcement (BSEE) inspector and which, in the opinion of the inspector, cannot be satisfactorily repaired must be so mutilated in the presence of the inspector that it cannot be used for the purpose for which it was originally intended. Lifesaving and fire fighting equipment subsequently determined to be unrepairable must be similarly mutilated in the presence of the person making that determination.
(b) Any deficiency or hazard discovered during an inspection by a Coast Guard marine inspector or a BSEE inspector is reported to the unit's owner or operator, who shall have the deficiency or hazard corrected or eliminated as soon as practicable and within the period of time specified by the inspector.
(c) Deficiencies and hazards discovered during an inspection of a fixed OCS facility under § 140.103(a) must be corrected or eliminated, if practicable, before the form CG-5432 is completed. Deficiencies and hazards that are not corrected or eliminated by the time the form is completed must be indicated on the form as “outstanding” and the form submitted to the appropriate BSEE District office. Upon receipt of a form CG-5432 indicating outstanding deficiencies or hazards, BSEE informs, by letter, the owner or operator of the fixed OCS facility of the deficiencies or hazards and the time period specified to correct or eliminate the deficiencies or hazards.
(d) For lifesaving and fire fighting equipment deficiencies on fixed OCS facilities that cannot be corrected before the submission of form CG-5432, the owner or operator must contact the appropriate BSEE District Supervisor to request a time period for repair of the item. The owner or operator must include a description of the deficiency and the time period approved by BSEE for correction of the deficiency in the comment section of form CG-5432.
(e) Where a deficiency or hazard remains uncorrected or uneliminated after the expiration of the time specified for correction or elimination, the Officer in Charge, Marine Inspection or BSEE (for deficiencies or hazards discovered by BSEE during an inspection of a fixed OCS facility), initiates appropriate enforcement measures.
[CGD84-098a, 53 FR 18981, May 26, 1988, as amended by USCG-2001-9045, 67 FR 5916, Feb. 7, 2002; USCG-2013-0797, 79 FR 36405, June 27, 2014]
Subpart C Investigations
§ 140.201 General.
The Coast Guard investigates casualties occurring on the OCS including:
(a) Casualties on floating OCS facilities, MODUs, and vessels as described in 46 CFR part 4;
(b) Casualties on fixed OCS facilities as described in 33 CFR 146.30;
(c) Oil spillage exceeding 200 barrels of oil in one occurrence during a 30-day period; and
(d) Other injuries, casualties, accidents, complaints of unsafe working conditions, fires, pollution, and incidents occurring as a result of OCS activities as the Officer in Charge, Marine Inspection, deems necessary to promote the safety of life or property or protect the marine environment.
[USCG-2013-1057, 91 FR 39484, June 30, 2026]
§ 140.203 Investigation procedures.
(a) Insofar as practicable, investigations conducted pursuant to this subchapter shall follow the procedures of 46 CFR part 4.
(b) Representatives of the U.S. Bureau of Safety and Environmental Enforcement may participate in these investigations. This participation may include, but is not limited to:
(1) Participating in a joint on-scene investigation;
(2) Making recommendations concerning the scope of the investigation;
(3) Calling and examining witnesses; and
(4) Submitting or requesting additional evidence.
(c) Reports of investigations conducted under this subchapter shall be made available to parties to the investigation and the public upon completion of agency action.
[CGD 78-160, 47 FR 9376, Mar. 4, 1982, as amended by USCG-2013-1057, 91 FR 39484, June 30, 2026]
§ 140.205 Subpoenas.
(a) In any investigation conducted pursuant to this subchapter, the investigating officer shall have the power to administer necessary oaths, subpoena witnesses, and require the production of books, papers, documents, and any other evidence.
(b) Attendance of witnesses or the production of books, papers, documents, or any other evidence shall be compelled by a process similar to that used in the District Courts of the United States.
PART 141 PERSONNEL
Authority: 43 U.S.C. 1356; 46 U.S.C. 70105; 49 CFR 1.46(z).
Source: CGD 78-160, 47 FR 9379, Mar. 4, 1982, unless otherwise noted.
Subpart A Restrictions on Employment
§ 141.1 Purpose.
This subpart prescribes rules governing restrictions on the employment of personnel on units engaged in OCS activities.
§ 141.5 Applicability.
(a) This subpart applies to employment of personnel on units engaged in OCS activities, except as provided in paragraph (b) of this section.
(b) This subpart does not apply to employment of personnel on any:
(1) Vessel subject to the citizenship requirements of 46 U.S.C. 8103 for pilots, crew, and officers holding a valid license or MMC with officer endorsement when the vessel is transiting to or from an OCS facility or a United States port;
(2) Vessel subject to the citizenship requirements of 46 U.S.C. 7102 and 8103 for officers and crew on federally subsidized or documented vessels; or
(3) Unit over 50 percent of which is owned by one or more citizens of a foreign nation or with respect to which one or more citizens of a foreign nation have the right effectively to control, except to the extent and to the degree that the President determines that the government of such foreign nation or any of its political subdivisions has implemented, by statute, regulation, policy, or practice, a national manning requirement for equipment engaged in the exploration, development, or production of oil or gas in its offshore areas.
(c) The Commandant may, upon request or upon that person's own initiative, determine whether over 50 percent of a particular unit is owned by citizens of a foreign nation or whether citizens of a foreign nation have the right effectively to control the unit.
(d) In determining whether ownership or a right effectively to control exists, the Commandant may consider operational control of a unit, management responsibility, title, lease and charter arrangements, and financial interests.
(e) The owner or operator of any unit affected is notified of the Commandant's determination.
(Information collection requirements contained in paragraph (c) were approved by the Office of Management and Budget under OMB control number 2130-0182)
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by CGD 97-023, 62 FR 33363, June 19, 1997; USCG-2006-24371, 74 FR 11212, Mar. 16, 2009]
§ 141.10 Definitions.
As used in this subpart:
Citizens of the United States means:
(1) In the case of an individual, one who is a native born, derivative, or fully naturalized citizen of the United States;
(2) In the case of a partnership, unincorporated company, or association, one in which 50% or more of the controlling interest is vested in citizens of the United States; or
(3) In the case of a corporation, one which is incorporated under the laws of the United States or of any State thereof.
Citizen of a foreign nation means:
(1) In the case of an individual, one who is not a citizen of the United States;
(2) In the case of a partnership, unincorporated company, or association, one in which more than 50% of the controlling interest is vested in citizens of a nation other than the United States; or
(3) In the case of a corporation, one which is incorporated under the laws of a nation other than the United States so long as (i) the title to a majority of the stock thereof is free from any trust or fiduciary obligation in favor of any citizen of the United States; (ii) the majority of the voting power in the corporation is not vested in any citizen of the United States; (iii) through any contract or understanding, the majority of the voting power may not be exercised directly or indirectly on behalf of any citizen of the United States; or (iv) by no other means, control of the corporation is conferred upon or permitted to be exercised by any citizen of the United States.
Resident alien means an alien lawfully admitted to the United States for permanent residence in accordance with section 101(a)(20) of the Immigration and Nationality Act of 1952, as amended, 8 U.S.C. 1101(a)(20).
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by USCG-2006-24371, 74 FR 11212, Mar. 16, 2009; USCG-2013-0916, 78 FR 69296, Nov. 19, 2013]
§ 141.15 Restrictions on employment.
(a) Each employer of personnel on any unit engaged in OCS activities that is subject to this part must employ, as members of the regular complement of the unit, only citizens of the United States or resident aliens except as provided by § 141.20.
(b) As used in paragraph (a) of this section, “regular complement of a unit” means those personnel necessary for the routine functioning of the unit, including marine officers and crew; industrial personnel on the unit, such as toolpushers, drillers, roustabouts, floor hands, crane operators, derrickmen, mechanics, motormen, and general maintenance personnel; and support personnel on the unit, such as cooks, stewards and radio operators. The term does not include specialists, professionals, or other technically trained personnel called in to handle emergencies or other temporary operations; extra personnel on a unit for training; and other personnel temporarily on a unit for specialized operations, such as construction, alteration, well logging, or unusual repairs or emergencies.
(c)(1) The Officer in Charge, Marine Inspection, may determine whether a particular individual or position is part of the regular complement of a unit. A copy of the determination is provided to the owner or operator of the unit affected.
(2) Determinations in paragraph (c)(1) of this section for all MODUs and fixed and floating OCS facilities, as those terms are defined in 33 CFR 140.10, operating within the USCG Heartland District Outer Continental Shelf Marine Inspection Zone will be made by the USCG Heartland District Outer Continental Shelf Officer in Charge, Marine Inspection, as defined and described in § 3.40-5 of this chapter.
(Approved by the Office of Management and Budget under OMB control number 2130-0182)
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by USCG-1998-3799, 63 FR 35530, June 30, 1998; USCG-2013-0491, 80 FR 20163, Apr. 15, 2015; USCG-2025-0716, 90 FR 47586, Oct. 2, 2025]
§ 141.20 Exemptions from restrictions on employment.
(a) An employer may request an exemption from the restrictions on employment in § 141.15 in order to employ persons other than citizens of the United States or resident aliens as part of the regular complement of the unit under the following circumstances:
(1) When specific contractual provisions or national registry manning requirements in effect on September 18, 1978 provide that a person other than a citizen of the United States or a resident alien is to be employed on a particular unit.
(2) When there is not a sufficient number of citizens of the United States or resident aliens qualified and available for the work.
(3) When the President determines with respect to a particular unit that the employment of only citizens of the United States or resident aliens is not consistent with the national interest.
(b) The request must be in writing, identify the provision of paragraph (a) of this section relied upon, and:
(1) If involving specific contractual provisions under paragraph (a)(1) of this section, list the persons claimed exempt and contain a copy of the contract;
(2) If involving persons without an H-2 Visa under paragraph (a)(2) of this section, list the persons or positions sought to be exempted; or
(3) If under paragraph (a)(3) of this section, identify the unit involved and contain any information in support of the claim.
(c) Requests must be submitted to the Commandant (CG-CVC), Attn: Office of Commercial Vessel Compliance, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501.
(d) Upon receipt of a request under paragraph (a)(2) of this section, the Coast Guard seeks information from the Department of Labor concerning whether there are citizens of the United States or resident aliens qualified and available for work. If information is provided that citizens of the United States or resident aliens are qualified and available, the employer may be required to seek their employment before the request is approved.
(e) Upon receipt of a request under paragraph (a)(3) of this section and after consulting with other Federal agencies as appropriate, the Commandant forwards the request and the comments of the Coast Guard and other interested agencies to the President for determination.
(f) Upon approval by the President for request under paragraph (a)(3) of this section or by the Coast Guard for all other requests, the Coast Guard issues a certification of the exemption. A certification issued under paragraph (a)(2) of this section is valid for one year from the date of issuance.
(g) If, within 30 days of receipt by the Coast Guard of a request under paragraph (a)(2) of this section, the Coast Guard does not make a determination or advise the employer that additional time for consideration is necessary, the request is considered approved for a period of 90 days from the end of the 30 day period.
(h) A request need not be submitted for persons who are not citizens of the United States or resident aliens and who:
(1) Are employed under the national registry manning requirements exception in paragraph (a)(1) of this section; or
(2) Have been classified and admitted to the United States as temporary workers under 8 U.S.C. 1101(a)(15)(H)(ii) for work in a position for which admitted.
(Approved by the Office of Management and Budget under OMB control number 2130-0182)
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by CGD 96-026, 61 FR 33665, June 28, 1996; USCG-2010-0351, 75 FR 36283, June 25, 2010; USCG-2014-0410, 79 FR 38434, July 7, 2014]
§ 141.25 Evidence of citizenship.
(a) For the purposes of this part, the employer may accept as sufficient evidence that a person is a citizen of the United States any one of the following documents and no others:
(1) A valid merchant mariner's document issued by the Coast Guard which shows the holder to be citizen of the United States.
(2) An original or certified copy of a birth certificate or birth registration issued by a state or the District of Columbia.
(3) A United States passport.
(4) A Certificate of Citizenship issued by the Immigration and Naturalization Service.
(5) A Certificate of Naturalization issued by a Naturalization Court.
(6) A letter from the Coast Guard issued under paragraph (d) of this section.
(b) If a person does not have one of the documents listed in paragraphs (a)(1) through (a)(6) of this section, that person may appear in person before an Officer in Charge, Marine Inspection, and submit one or more of the following documents which may be considered as evidence that the applicant is a citizen of the United States:
(1) A Certificate of Derivative Citizenship or a Certificate of Naturalization of either parent and a birth certificate of the applicant or other evidence satisfactorily establishing that the applicant was under 21 years of age at the time of the parent's naturalization.
(2) An original or certified copy of a birth certificate from a political jurisdiction outside the United States which demonstrates citizenship status.
(3) A Baptismal certificate or parish record recorded within one year after birth.
(4) A statement of a practicing physician certifying that the physician attended the birth and has a record showing the date on which the birth occurred.
(5) A commission, or evidence of commission, in the Armed Forces of the United States which shows the holder to be a citizen of the United States.
(6) A continuous discharge book or certificate of identification issued by the Coast Guard or the former Bureau of Marine Inspection, provided the document shows that the applicant produced satisfactory evidence of citizenship at the time the document was issued.
(7) A delayed certificate of birth issued under a state seal, provided there are no collateral facts indicating fraud in its procurement.
(8) A report of the Census Bureau showing the earliest available record of the applicant's age or birth.
(9) Affidavits of parents, relatives, or two or more responsible citizens of the United States, school records; immigration records; insurance policies; or other records which support the citizenship claim.
(c) In any case where doubt exists concerning evidence of citizenship submitted under paragraph (b) of this section, the Officer in Charge, Marine Inspection, may refer the matter to the United States Immigration and Naturalization Service for an advisory opinion.
(d) If the documents submitted under paragraph (b) of this section are determined by the Officer in Charge, Marine Inspection, to be sufficient evidence that the applicant is a citizen of the United States, the Coast Guard issues the applicant a letter acknowledging this determination.
(Approved by the Office of Management and Budget under OMB control number 2130-0182)
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by USCG-2006-24371, 74 FR 11212, Mar. 16, 2009]
§ 141.30 Evidence of status as a resident alien.
For the purposes of this part, the employer may accept as sufficient evidence that a person is a resident alien any one of the following documents and no others:
(a) A valid merchant mariner's document issued by the Coast Guard.
(b) An alien registration receipt card issued by the Immigration and Customs Enforcement Agency certifying that the card holder has been admitted to the United States as an immigrant.
(c) A declaration of intention to become a citizen of the United States issued by a Naturalization Court.
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by USCG-2006-24371, 74 FR 11212, Mar. 16, 2009; USCG-2013-0916, 78 FR 69296, Nov. 19, 2013]
§ 141.35 Records to be kept by the employer.
(a) The employer of personnel subject to this subpart shall maintain, and make available to the Coast Guard upon request, a record identifying which of the documents listed in §§ 141.25 and 141.30 were relied upon for each employee. The record must consist of either a copy of the document or the following information on the document:
(1) For a merchant mariner's document or a United States passport, the document's title and identification number.
(2) For a birth certificate or birth registration, the document's title and the employee's date and place of birth.
(3) For all other documents listed in §§ 141.25 and 141.30, the document's title and date and place of issuance.
(b) The employer of personnel subject to this subpart shall maintain a written list of the positions that make up the regular complement of the unit and the name and nationality of the individual filling each employee position. This list may be in summary form and any simple format.
(Approved by the Office of Management and Budget under OMB control number 2130-0182)
[CGD 78-160, 47 FR 9379, Mar. 4, 1982, as amended by USCG-2006-24371, 74 FR 11212, Mar. 16, 2009; USCG-2013-0916, 78 FR 69296, Nov. 19, 2013]
PART 142 WORKPLACE SAFETY AND HEALTH
Authority: 43 U.S.C 1333(d)(1), 1347(c), 1348(c); 49 CFR 1.46(z).
Source: CGD 79-077, 51 FR 25059, July 10, 1986, unless otherwise noted.
Subpart A General
§ 142.1 Purpose.
This part is intended to promote workplace safety and health by establishing requirements relating to personnel, workplace activities and conditions, and equipment on the Outer Continental Shelf (OCS).
§ 142.4 Duties of lessees, permittees, and persons responsible for actual operations.
(a) Each holder of a lease or permit under the Act shall ensure that all places of employment within the lease area or within the area covered by the permit on the OCS are maintained in compliance with workplace safety and health regulations of this part and, in addition, free from recognized hazards.
(b) Persons responsible for actual operations, including owners, operators, contractors, and subcontractors, shall ensure that those operations subject to their control are conducted in compliance with workplace safety and health regulations of this part and, in addition, free from recognized hazards.
(c) “Recognized hazards”, in paragraphs (a) and (b) of this section, means conditions which are—
(1) Generally known among persons in the affected industry as causing or likely to cause death or serious physical harm to persons exposed to those conditions; and
(2) Routinely controlled in the affected industry.
§ 142.7 Reports of unsafe working conditions.
(a) Any person may report a possible violation of any regulation in this subchapter or any other hazardous or unsafe working condition on any unit engaged in OCS activities to an Officer in Charge, Marine Inspection.
(b) After reviewing the report and conducting any necessary investigation, the Officer in Charge, Marine Inspection, notifies the owner or operator of any deficiency or hazard and initiates enforcement measures as the circumstances warrant.
(c) The identity of any person making a report under paragraph (a) of this section is not made available, without the permission of the reporting person, to anyone other than those officers and employees of the Department of Transportation who have a need for the record in the performance of their official duties.
Subpart B Personal Protective Equipment
§ 142.21 Purpose and applicability.
This subpart prescribes requirements concerning personal protection on OCS facilities.
§ 142.24 Use of equipment.
(a) Each holder of a lease or permit issued under the Act shall ensure that all personnel who are required by this subpart to use or wear personal protective equipment do so when within the lease area or the area covered by the permit.
(b) Persons responsible for actual operations shall ensure that all personnel engaged in the operation properly use or wear the personal protective equipment specified by this subpart.
§ 142.27 Eye and face protection.
(a) Personnel engaged in or observing welding, grinding, machining, chipping, handling hazardous materials, or acetylene burning or cutting shall wear the eye and face protector specified for the operation in Figure 8 of ANSI Z87.1.
(b) Eye and face protectors must be maintained in good condition.
(c) Each eye and face protector must be marked with the information required by ANSI Z87.1 for that type of protector.
§ 142.30 Head protection.
(a) Personnel in areas where there is a hazard of falling objects or of contact with electrical conductors shall wear a head protector meeting the specifications of ANSI Z89.1, for the hazard involved.
(b) Each head protector must be marked with the information specified by ANSI Z89.1 for that type of protector and for the hazard involved.
§ 142.33 Foot protection.
(a) Personnel working in areas or engaged in activities where there is a reasonable probability for foot injury to occur shall wear footwear meeting the specifications of ANSI Z41, except when environmental conditions exist that present a hazard greater than that against which the footwear is designed to protect.
(b) Each pair of footwear must be marked with the information specified by ANSI Z41 for the type of footwear.
[CGD 79-077, 51 FR 25059, July 10, 1986, as amended at 51 FR 28381, Aug. 7, 1986]
§ 142.36 Protective clothing.
Personnel in areas where there are flying particles, molten metal, radiant energy, heavy dust, or hazardous materials shall wear clothing and gloves providing protection against the hazard involved.
§ 142.39 Respiratory protection.
(a) Personnel in an atmosphere specified under ANSI Z88.2, requiring the use of respiratory protection equipment shall wear the type of respiratory protection equipment specified in ANSI Z88.2 for that atmosphere.
(b) Before personnel enter an atmosphere specified under ANSI Z88.2 requiring the use of respiratory protection equipment, the persons listed in § 142.4 shall ensure that the personnel entering the atmosphere—
(1) Follow the procedures stated in section 6 of ANSI Z88.2 concerning the proper selection of a respirator and individual fit testing; and
(2) Are trained in the matters set forth in section 7 of ANSI Z88.2 concerning proper use of the equipment to be used and in the generally recognized short and long term harmful effects of exposure to the atmosphere involved.
(c) All respiratory protection equipment must be approved, used, and maintained in accordance with ANSI Z88.2.
[CGD 79-077, 51 FR 25059, July 10, 1986, as amended at 51 FR 28381, Aug. 7, 1986]
§ 142.42 Safety belts and lifelines.
(a) Except when moving from one location to another, personnel engaged in an activity where there is a hazard of falling 10 or more feet shall wear a safety belt or harness secured by a lanyard to a lifeline, drop line, or fixed anchorage.
(b) Each safety belt, harness, lanyard, lifeline, and drop line must meet the specifications of ANSI A10.14.
§ 142.45 Personal flotation devices.
Personnel, when working in a location such that, in the event of a fall, they would likely fall into water, shall wear a work vest that meets the requirements of 33 CFR 146.20 or a life preserver that meets the requirements of 46 CFR 160.002, 160.005, or 160.055, except when using the safety belts and lifelines required by § 142.42.
§ 142.48 Eyewash equipment.
Portable or fixed eyewash equipment providing emergency relief must be immediately available near the drill floor, mudrooms, and other areas where there is a reasonable probability that eye injury may occur.
[CGD 79-077, 51 FR 28381, Aug. 7, 1986]
Subpart C General Workplace Conditions
§ 142.81 Purpose and applicability.
This subpart prescribes requirements relating to general working conditions on OCS facilities.
§ 142.84 Housekeeping.
All staging, platforms, and other working surfaces and all ramps, stairways, and other walkways must be kept clear of portable tools, materials, and equipment not in use and be promptly cleared of substances which create a tripping or slipping hazard. When engaged in an activity on the drill floor in which the spillage of drilling fluid is inevitable, such as when pulling wet strings of drill pipe, footwear and flooring designed to reduce slipping substantially may be used instead of keeping the drill floor free of drilling fluid during the activity.
[CGD 79-077, 51 FR 28381, Aug. 7, 1986]
§ 142.87 Guarding of deck openings.
Openings in decks accessible to personnel must be covered, guarded, or otherwise made inaccessible when not in use. The manner of blockage shall prevent a person's foot or body from inadvertently passing through the opening.
§ 142.90 Lockout and tagout.
(a) While repair or other work is being performed on equipment powered by an external source, that equipment must be locked out as required in paragraph (b) of this section or, if a lockout provision does not exist on the equipment, must be disconnected from the power source or otherwise deactivated, unless the nature of the work being performed necessitates that the power be connected or the equipment activated.
(b) If the equipment has a lockout or other device designed to prevent unintentional activation of the equipment, the lockout or other device must be engaged while the work is being performed on the equipment, unless the nature of the work being performed necessitates that the equipment be activated.
(c) A tag must be placed at the point where the equipment connects to a power source and at the location of the control panel activating the power, warning—
(1) That equipment is being worked on; and
(2) If the power source is disconnected or the equipment deactivated, that the power source must not be connected or the equipment activated.
(d) The tags must not be removed without the permission of either the person who placed the tags, that person's immediate supervisor, or their respective reliefs.
[CGD 79-077, 51 FR 25059, July 10, 1986; 51 FR 28382, Aug. 7, 1986]
PART 143 DESIGN AND EQUIPMENT
Authority: 43 U.S.C. 1333(d)(1), 1348(c), 1356; 49 CFR 1.46; section 143.210 is also issued under 14 U.S.C. 946 and 31 U.S.C. 9701.
Source: CGD 78-160, 47 FR 9382, Mar. 4, 1982, unless otherwise noted.
Subpart A General
§ 143.1 Purpose.
This part prescribes design and equipment requirements for units engaged in OCS activities.
§ 143.15 Lights and warning devices.
(a) OCS facilities must meet the lights and warning devices requirements under part 67 of this chapter concerning aids to navigation on artificial islands and fixed structures.
(b) Vessels, including attending vessels but excluding MODUs under paragraph (a) of this section, must meet the lights and warning devices requirements under the International Regulations for Preventing Collisions at Sea 1972 or under local rules provided for in Rule 1 of those Regulations.
[CGD 78-160, 47 FR 9382, Mar. 4, 1982, as amended by USCG-1998-3799, 63 FR 35530, June 30, 1998]
Subpart B OCS Facilities
§ 143.100 Applicability.
This subpart applies to OCS facilities except mobile offshore drilling units.
§ 143.101 Means of escape.
(a) “Primary means of escape” shall be fixed stairways or fixed ladders of metal construction.
(b) “Secondary means of escape” shall be types approved for “primary means of escape” or portable, flexible ladders, knotted man ropes, and other devices satisfactory to the Officer in Charge, Marine Inspection.
(c) Manned OCS facilities shall be provided with at least two “primary means of escape” extending from the uppermost platform level that contains living quarters or that personnel occupy continuously, to each successively lower working level and to the water surface. Working levels without living quarters, shops, or offices in manned facility structural appendages, extensions, and installations that personnel occupy only occasionally shall be provided with one “primary means of escape” and, when necessary in the opinion of the Officer in Charge, Marine Inspection, one or more “secondary means of escape.”
(d) Unmanned OCS facilities shall be provided with at least one “primary means of escape” extending from the uppermost platform working level to each successively lower working level and to the water surface. When personnel are on board, unmanned facilities shall also be provided with one or more “secondary means of escape,” but not more than one will be required for every 10 persons extending from the uppermost working level of the facility to each successively lower working level and to the water surface, excluding facility appendages and installations, unless “secondary means of escape” from such appendages and installations are necessary in the opinion of the Officer in Charge, Marine Inspection.
(e) “Means of escape” shall be suitably accessible to personnel for rapid facility evacuation.
(f) When two or more “means of escape” are installed, at least two shall be located as nearly diagonally opposite each other as practicable unless such requirement is unreasonable or impracticable in the opinion of the Officer in Charge, Marine Inspection.
§ 143.105 Personnel landings.
(a) Sufficient personnel landings shall be provided on each manned OCS facility to assure safe access and egress. When due to special construction personnel landings are not feasible, then suitable transfer facilities to provide safe access and egress shall be installed.
(b) The personnel landings shall be provided with satisfactory illumination. The minimum shall be one-foot candle of artificial illumination as measured at the landing floor and guards and rails.
§ 143.110 Guards and rails.
(a) Except for helicopter landing decks which are provided for in paragraph (b) of this section, and areas not normally occupied, the unprotected perimeter of all floor or deck areas and openings shall be rimmed with guards and rails or wire mesh fence. The guard rail or fence shall be at least 42 inches high. The two intermediate rails shall be so placed that the rails are approximately evenly spaced between the guard rail and the floor or deck area: Provided, That if a toe board is installed then one of the intermediate rails may be omitted and the other rail placed approximately half way between the top of the toe board and the top guard rail.
(b) The unprotected perimeter of the helicopter landing deck shall be protected with a device of sufficient strength and size as to prevent any person from falling from such deck.
(c) Each catwalk and each stairway shall be provided with a suitable guard rail or rails, as necessary.
§ 143.120 Floating OCS facilities.
(a) Before construction is started on a proposed floating OCS facility, the owner or operator of the facility must submit to the Coast Guard for approval all plans and information listed in subpart C of 46 CFR part 107 which relate to the facility. All plans and information must be submitted according to the procedures in that subpart.
(b) The facility must comply with the requirements of subchapters F (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and Equipment). Where unusual design or equipment needs make compliance impracticable, alternative proposals that provide an equivalent level of safety may be accepted. These requirements do not apply to production systems on the facility.
(c) The Officer in Charge, Marine Inspection, determines whether a floating OCS facility meets the requirements of paragraph (b) of this section and issues a certificate of inspection for each facility which meets these requirements. Inspection of the facility may be required as part of this determination.
(d) Each floating OCS facility that is constructed after April 2, 2018 must comply with the requirements of 46 CFR subpart 111.108 prior to engaging in OCS activities.
[CGD 78-160, 47 FR 9382, Mar. 4, 1982, as amended by USCG-2012-0850, 80 FR 16990, Mar. 31, 2015]
Subpart C Mobile Offshore Drilling Units
§ 143.200 Applicability.
This subpart applies to mobile offshore drilling units when engaged in OCS activities.
§ 143.201 Existing MODUs exempted from new design requirements.
Any mobile offshore drilling unit built before, under construction on, or contracted for prior to April 5, 1982 is not required to meet the design requirements of this subpart until the unit is rebuilt. Until rebuilt, the unit must continue to comply with the design requirements applicable to the unit on April 4, 1982.
[CGD 78-160, 47 FR 11011, Mar. 15, 1982]
§ 143.205 Requirements for U.S. and undocumented MODUs.
Each mobile offshore drilling unit that is documented under the laws of the United States or not documented under the laws of any nation must comply with the design, equipment, and inspection requirements of 46 CFR parts 107 and 108 in order to engage in OCS activities.
§ 143.207 Requirements for foreign MODUs.
Each mobile offshore drilling unit that is documented under the laws of a foreign nation must, when engaged in OCS activities, comply with one of the following:
(a) The design and equipment standards of 46 CFR part 108.
(b) The design and equipment standards of the documenting nation if the standards provide a level of safety generally equivalent to or greater than that provided under 46 CFR part 108.
(c) The design and equipment standards for mobile offshore drilling units contained in the International Maritime Organization (IMO, formerly Inter-Governmental Maritime Consultative Organization or IMCO) (IMO) Code for Construction and Equipment of Mobile Offshore Drilling Units (IMO Assembly Resolution A.414(XI)) which has been incorporated by reference.
§ 143.208 Hazardous location requirements on foreign MODUs.
Each mobile offshore drilling unit that is documented under the laws of a foreign nation and is constructed after April 2, 2018 must comply with the requirements of 46 CFR subpart 111.108 prior to engaging in OCS activities.
[USCG-2012-0850, 80 FR 16990, Mar. 31, 2015]
§ 143.210 Letter of compliance.
(a) The Officer in Charge, Marine Inspection, determines whether a mobile offshore drilling unit which does not hold a valid Coast Guard Certificate of Inspection meets the requirements of § 143.205 or § 143.207 relating to design and equipment standards and issues a letter of compliance for each unit which meets the requirements. Inspection of the unit may be required as part of this determination.
(b) A letter of compliance issued under paragraph (a) of this section is valid for one year or until the MODU departs the OCS for foreign operations, whichever comes first.
(c) The owner or operator of a foreign mobile offshore drilling unit requiring a letter of compliance examination must pay the fee prescribed in 46 CFR 2.10-130.
[CGD 84-098a, 53 FR 18981, May 26, 1988, as amended by CGD 91-030, 60 FR 13563, Mar. 13, 1995]
Subpart D Vessels
§ 143.300 Applicability.
This subpart applies to all vessels engaged in OCS activities except mobile offshore drilling units.
§ 143.301 Load line requirements.
(a) Vessels, including foreign vessels, which would be subject to the requirements of subchapter E of 46 CFR chapter I concerning load lines when arriving at or proceeding to sea from any port or place within the United States must comply with those requirements when engaged in activities on the OCS.
(b) Load line certificates and load line exemption certificates issued or accepted under subchapter E of 46 CFR chapter I are accepted as evidence of compliance with paragraph (a) of this section.
§ 143.302 Hazardous location requirements on foreign vessels engaged in OCS activities.
Each vessel that is documented under the laws of a foreign nation and is constructed after April 2, 2018 must comply with the requirements of 46 CFR subpart 111.108 prior to engaging in OCS activities.
[USCG-2012-0850, 80 FR 16990, Mar. 31, 2015]
Subpart E Standby Vessels
Source: CGD 84-098b, 54 FR 21571, May 18, 1989, unless otherwise noted.
§ 143.400 Applicability.
This subpart applies only to standby vessels meeting the requirements of this subpart and specifically designated in an Emergency Evacuation Plan (EEP) required by § 146.140 or § 146.210 of this chapter to provide rapid evacuation assistance in the event of an emergency.
§ 143.401 Vessel certification and operation.
Standby vessels must meet the following:
(a) Have a valid certificate of inspection issued in compliance with Subchapters H, I, or T of 46 CFR Chapter I.
(b) Be capable of carrying and providing shelter for 100 per cent of the number of persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of this section.
(c) Provide bunks or aircraft type reclining seats for 10 per cent of the number of persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of this section.
(d) Not carry or store goods, supplies, and equipment on the deck of the standby vessel or in other locations that may hinder the vessel's ability to render assistance to the facility that the vessel is designated to assist.
(e) Not carry or store any hazardous material.
§ 143.405 Equipment.
(a) Standby vessels must have, at least, the following equipment:
(1) Multiple propellers or propulsion devices.
(2) Two searchlights.
(3) For vessels certificated under Subchapter H of 46 CFR Chapter I, a line throwing appliance that meets the requirements in 46 CFR 75.45.
(4) For vessels certificated under subchapters I or T of 46 CFR chapter I, a line throwing appliance that meets the requirements of 46 CFR 94.45.
(5) A Stokes or comparable litter.
(6) One blanket for each person on the most populated facility that the standby vessel is designated to assist.
(7) Means for safely retrieving persons, including injured or helpless persons, from the water. The means of retrieval must be demonstrated to the satisfaction of the Officer in Charge, Marine Inspection.
(8) A scramble net that can be rigged on either side of the standby vessel.
(9) A minimum of four Coast Guard approved ring life buoys, each equipped with 15 fathoms of line.
(10) An immersion suit approved by the Coast Guard under 46 CFR 160.171, or a buoyant suit meeting Supplement A of ANSI/UL-1123-1987 and approved under 46 CFR 160.053, for each member of the standby vessel's crew when the standby vessel operates north of 32 degrees north latitude in the Atlantic Ocean or north of 35 degrees north latitude in all other waters.
(11) Two boat hooks.
(12) A fire monitor with a minimum flow rate of, at least, 500 gallons per minute.
(13) One two-way radio capable of voice communications with the OCS facility, helicopters or other rescue aircraft, rescue boats, and shore side support personnel.
(14) Floodlights to illuminate the personnel and boat retrieval area, the scramble net when deployed, and the water around the personnel retrieval and scramble net deployment areas.
(15) A copy of “The Ship's Medicine Chest and Medical Aid at Sea”, DHHS Publication No. (PHS) 84-2024, available from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
(16) An industrial first aid kit sized for 50 percent of the number of persons on the most populated facility that the standby vessel is designated to assist.
(17) Coast Guard approved life preservers for 50 percent of the number of persons on the most populated facility that the standby vessel is designated to assist.
(b) Equipment required by paragraph (a) of this section must be to the satisfaction of the Officer in Charge, Marine Inspection.
§ 143.407 Manning.
Standby vessels must be crewed in accordance with their certificate of inspection for 24 hour operation. The Officer in Charge, Marine Inspection, may require the crew to be augmented, as necessary, to provide for maneuvering the standby vessel, for lookouts, for rigging and operating retrieval equipment, and for caring for survivors.
PART 144 LIFESAVING APPLIANCES
Authority: 43 U.S.C. 1333d; 46 U.S.C. 3102(a); 46 CFR 1.46.
Subpart 144.01 Manned Platforms
§ 144.01-1 Life floats.
Each manned platform shall be provided with at least two approved life floats. The life floats shall have sufficient capacity to accommodate all persons present at any one time.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956]
§ 144.01-5 Location and launching of life floats.
The life floats shall be distributed in accessible locations and mounted on the outboard sides of the working platform in such a manner as to be readily launched.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956]
§ 144.01-10 Equipment for life floats.
(a) Each lifefloat shall be provided with a painter. This painter shall be a manila rope not less than 2 3/4 inches in circumference and of a length not less than three times the distance from the deck where the lifefloat is stowed to the low water line. Alternatively, the painter may be of other material provided it has equal strength to the size of manila rope specified and is not less than 1/2 inch in diameter.
(b) Each life float must have a water light of an approved automatic electric type constructed in accordance with 46 CFR Subpart 161.010, except a water light constructed in accordance with former 46 CFR Subpart 161.001 that was installed before January 1, 1972, may be retained in an existing installation as long as it is maintained in good condition. The water light must be attached to the life float by a 12-thread manila or equivalent synthetic lanyard not less than 2 meters (6 feet) nor more than 4 meters (12 feet) in length. The water light must be mounted on a bracket so that when the life float is launched, the water light will pull free of the bracket.
(c) Two paddles shall be provided for each life float. The paddles shall not be less than five feet nor more than six feet long. The paddles shall be stowed in such a way that they will be readily accessible from either side of the life float when in the water.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956]
Editorial Note:For Federal Register citations affecting § 144.01-10, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 144.01-15 Alternates for life floats.
(a) Approved lifeboats, approved life rafts or approved inflatable life rafts may be used in lieu of approved life floats for either all or part of the capacity required. When either lifeboats or life rafts are used approved means of launching will be required. Inflatable life rafts, when used, shall be distributed and mounted as required for life floats under § 144.01-5.
(b) The equipment required for a lifeboat is a bailer, boat hook, bucket, hatchet, lantern, life line, two life preservers, matches, full complement of oars and steering oar, painter, plug, and rowlocks, of the same type, kind, and character as required for lifeboats carried on vessels engaged in navigating bays, sounds, and lakes other than the Great Lakes, and rivers.
(c) The equipment required for a life raft is a boat hook, life line (if not a Type A life raft), full complement of oars and steering oar, painter, and rowlocks of the same type, kind, and character as required for life rafts carried on cargo and miscellaneous vessels navigating on bays, sounds, and lakes other than the Great Lakes.
(d) Inflatable liferafts shall be approved by the Coast Guard under approval series 160.151. An approved “Limited Service” or “Ocean Service” liferaft installed on board a platform before May 9, 1997, may continue to be used to meet the requirements of this section provided it is maintained in good and serviceable condition.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956, as amended by CGFR 60-35 25 FR 10132, Oct. 25, 1960; CGD 85-205, 62 FR 35392, July 1, 1997]
§ 144.01-20 Life preservers.
(a) An approved life preserver shall be provided for each person on a manned platform. The life preservers shall be located in easily accessible places.
(b) All kapok and fibrous glass life preservers which do not have plastic-covered pad inserts shall be removed from service.
(c) Each life preserver carried on a manned platform must have a personal flotation device light that is approved under Subpart 161.012 of 46 CFR part 161. Each light must be securely attached to the front shoulder area of the life preserver.
(d) Each life preserver carried on a manned platform must have at least 200 sq. cm (31 sq. in.) of retroreflective material attached on its front side, at least 200 sq. cm on its back side, and at leat 200 sq. cm of material on each of its reversible sides. The material must be Type I material that is approved under 46 CFR 164.018. The material attached on each side of a life preserver must be divided equally between the upper quadrants of the side, and the material in each quadrant must be attached as closely as possible to the shoulder area of the life preserver.
[CGFR 60-35, 25 FR 10132, Oct. 25, 1960, as amended by CGD 78-160, 47 FR 9383, Mar. 3, 1982; USCG-1998-3799, 63 FR 35530, June 30, 1998]
§ 144.01-25 Ring life buoys.
(a) Each manned platform must have at least four approved ring life buoys constructed in accordance with 46 CFR Subpart 160.050; except ring life buoys approved under former 46 CFR Subpart 160.009 may be used as long as they are in good and serviceable condition. One ring life buoy must be placed on a suitable rack on each side of a manned platform in an accessible place. The ring life buoy must always be capable of being cast loose and may not be permanently secured in any way.
(b) Each ring life buoy must have a water light of an approved automatic electric type constructed in accordance with 46 CFR Subpart 161.010. A water light constructed in accordance with former 46 CFR Subpart 161.001 that was installed before January 1, 1972 may be retained in an existing installation as long as it is maintained in good condition. The water light must be attached to the ring life buoy by a 12-thread manila or equivalent synthetic lanyard not less than 1 meter (3 feet) nor more than 2 meters (6 feet) in length. The water light must be mounted on a bracket near the ring life buoy so that when the ring life buoy is cast loose, the water light will pull free of the bracket.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956, as amended by CGD 79-165b, 45 FR 65208, Oct. 2, 1980; CGD 80-155b. 47 FR 10533, Mar. 11, 1982]
§ 144.01-30 First-aid kit.
On each manned platform a first-aid kit approved by the Commandant or the U.S. Bureau of Mines shall be provided and kept in the custody of the person in charge.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956, as amended by CGD 73-177R, 40 FR 8176, Feb. 26, 1975]
§ 144.01-35 Litter.
On each manned platform a Stokes litter, or other suitable safety litter capable of being safely hoisted with an injured person, shall be provided and kept in an accessible place.
[CGFR 68-154, 33 FR 18626, Dec. 17, 1968]
§ 144.01-40 Emergency communications equipment.
On manned platforms means of communication by radio and/or wire telephone shall be provided for contacting the shore or vessels in the vicinity for aid in the event of an emergency.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956]
Subpart 144.10 Unmanned Platforms
§ 144.10-1 Lifesaving equipment.
(a) Except as allowed in paragraph (b) of this section, no person may be on an unmanned platform unless the following lifesaving equipment is readily accessible on the platform:
(1) A life preserver or a Type I—Personal flotation device, listed in Table 1, for each person.
Table 1—Life Preservers and Equivalent Performance Flotation Devices
Devices marked | Equivalent to performance type marked
160.002 Life preserver | Type I—Personal flotation device.
160.003 Life preserver | Type I—Personal flotation device.
160.004 Life preserver | Type I—Personal flotation device.
160.005 Life preserver | Type I—Personal flotation device.
160.055 Life preserver | Type I—Personal flotation device.
(2) An approved ring life buoy (Type IV PFD) for every two persons, but no more than four devices are required. Each ring life buoy must be of a type constructed in accordance with 46 CFR subpart 160.050; except a ring life buoy that was approved under former 46 CFR subpart 160.009 may be used as long as it is in good and serviceable condition.
(3) Each ring life buoy under paragraph (a)(2) of this section must have an approved automatic electric water light that is attached as described in § 144.01-25(b).
(b) The ring life buoys required in paragraph (a)(2) of this section may be kept on a manned vessel that remains alongside the platform if there is no available space to keep them on the platform.
[CGD 73-177R, 40 FR 8176, Feb. 26, 1975, as amended by CGD 80-155b, 47 FR 10533, Mar. 11, 1982]
§ 144.10-10 Other lifesaving equipment.
Any lifesaving equipment on an unmanned platform that is not required in § 144.10-1 must meet the standards contained in Subpart 144.01 of this part.
[CGD 73-177R, 40 FR 8176, Feb. 26, 1975]
Subpart 144.20 Requirements for U.S. and Undocumented MODU's
Authority: Sec. 4, 67 Stat. 462 (43 U.S.C. 1333) as amended; 49 CFR 1.46(z).
§ 144.20-1 Applicability.
This subpart applies to each MODU operating on the OCS that is not inspected under 46 CFR subchapter I-A.
[CGD 82-075b, 49 FR 4377, Feb. 6, 1984]
§ 144.20-5 Exposure suits.
This section applies to each MODU except those operating south of 32 degrees North latitude in the Atlantic Ocean or south of 35 degrees North latitude in all other waters.
(a) Each MODU must carry an exposure suit for each person on board. The exposure suit must be stowed in a readily accessible location in or near the berthing area of the person for whom the exposure suit is provided.
(b) In addition to the exposure suits required by paragraph (a) of this section, each watch station and work station must have enough exposure suits to equal the number of persons normally on watch in, or assigned to, the station at one time. However, an exposure suit need not be provided at a watch or work station for a person whose cabin, stateroom, or berthing area (and the exposure suits stowed in that location) is readily accessible to the station.
(c) Each exposure suit on a MODU must be of a type approved under 46 CFR 160.171.
(d) Each exposure suit must have a personal flotation device light that is approved under 46 CFR 161.012. Each light must be securely attached to the front shoulder area of the exposure suit.
(e) Each exposure suit on a MODU must be provided with a whistle of the ball type or multi-tone type, of corrosion resistant construction, and in good working order. The whistle must be attached to the exposure suit by a lanyard without hooks, snaps, clips, etc., that is long enough to permit the whistle to reach the mouth of the wearer. If the lanyard allows the whistle to hang below the waist of the wearer, the whistle must be stowed in a pocket on the exposure suit, or with the lanyard coiled and stopped off.
(f) No stowage container for exposure suits may be capable of being locked.
[CGD 82-075b, 49 FR 4377, Feb. 6, 1984, as amended by CGD 84-090, 50 FR 3904, Jan. 29, 1985; USCG-2000-7223, 65 FR 40057, June 29, 2000]
Subpart 144.30 Requirements for Foreign MODU's
Authority: Sec. 4, 67 Stat. 462 (43 U.S.C. 1333) as amended; 49 CFR 1.46(z).
§ 144.30-1 Applicability.
This subpart applies to each MODU engaged in OCS activities that is documented under the laws of a foreign nation.
[CGD 82-075b, 49 FR 4377, Feb. 6, 1984]
§ 144.30-5 Exposure suits.
Each foreign MODU must meet the requirements of § 144.20-5 of this chapter, except as follows:
(a) Exposure suits (immersion suits, survival suits, etc.) approved by the nation under which the MODU is documented may be used in lieu of suits approved under 46 CFR 160.071, provided that they are accepted by the Commandant as providing equivalent thermal protection to the wearer. (Requests for acceptance of such suits should be sent to Commandant (CG-ENG-4), Attn: Lifesaving and Fire Safety Division, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509, along with technical data supporting the thermal performance of the suits.)
(b) Personal flotation device lights approved by the nation under which the MODU is documented may be used in lieu of lights approved under 46 CFR 161.012.
[CGD 82-075b, 49 FR 4377, Feb. 6, 1984, as amended by CGD 88-052, 53 FR 25121, July 1, 1988; CGD 96-026, 61 FR 33665, June 28, 1996; USCG-2010-0351, 75 FR 36283, June 25, 2010; USCG-2014-0410, 79 FR 38435, July 7, 2014]
PART 145 FIRE-FIGHTING EQUIPMENT
Authority: Sec. 633, 63 Stat. 545; sec. 4, 67 Stat. 462; 14 U.S.C. 503; 43 U.S.C. 1333.
§ 145.01 Portable and semi-portable fire extinguishers.
(a) On all manned platforms and on all unmanned platforms where crews are continuously working on a 24-hour basis, Coast Guard-approved portable fire extinguishers and/or Coast Guard-approved semi-portable fire extinguishers must be installed and maintained. On all unmanned platforms where crews are not continuously working on a 24-hour basis, Coast Guard-approved portable fire extinguishers and/or Coast Guard-approved semi-portable fire extinguishers are required to be installed and maintained only when crews are working on them.
(b) Portable and semi-portable fire extinguishers must be inspected and maintained in accordance with NFPA 10 (incorporated by reference, see § 140.7 of this chapter) as amended here:
(1) Certification or licensing by a state or local jurisdiction as a fire extinguisher servicing agency will be accepted by the Coast Guard as meeting the personnel certification requirements of NFPA 10 for annual maintenance and recharging of extinguishers.
(2) Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew.
(3) Non-rechargeable or non-refillable fire extinguishers must be inspected and maintained in accordance with NFPA 10. However, the annual maintenance need not be conducted by a certified person and can be conducted by the owner, operator, person-in-charge, or a designated member of the crew.
(4) The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records has not been properly maintained, a qualified servicing facility must perform the required inspections, maintenance procedures, and hydrostatic pressure tests. A tag issued by a qualified servicing organization, and attached to each extinguisher, may be accepted as evidence that the necessary maintenance procedures have been conducted.
[USCG-2012-0196, 81 FR 48242, July 22, 2016]
§ 145.05 [Reserved]
§ 145.10 Location, number, and installation of fire extinguishers.
(a) Approved portable and semi-portable extinguishers must be installed in accordance with Table 145.10(a).
(b) Semi-portable extinguishers must be located in the open so as to be readily seen.
(c) Semi-portable extinguishers must be fitted with a suitable hose and nozzle, or other practicable means, so all of the space can be protected.
(d) Table 145.10(a) of this section indicates the minimum number and size of fire extinguishers required for each space listed. Extinguishers with larger numerical ratings or multiple letter designations may be used if the extinguishers meet the requirements of the table.
Table 145.10(a)—Portable and Semi-Portable Extinguishers
Space | Minimum required rating | Quantity and location
Safety Areas:
Communicating corridors | 2-A | 1 in each main corridor not more than 150 ft apart. (May be located in stairways.)
Radio room | 20-B:C | 1 in the vicinity of the exit.
Accommodations:
Sleeping accommodations | 2-A | 1 in each sleeping accommodation space outfitted for 4 or more persons.
Service Spaces:
Galleys | 40-B:C | 1 for each 2,500 sq ft of floor space or fraction thereof.
Storerooms | 2-A | 1 for each 2,500 sq ft of floor space or fraction thereof. The extinguisher must be located in the vicinity of the exits, either inside or outside of spaces.
Machinery Spaces:
Gas-fired boilers | 40-B | 2 required.
160-B | 1 required. 1
Oil-fired boilers | 40-B | 2 required.
160-B | 2 required. 1
Internal combustion or gas turbine engines | 40-B | 1 for each engine. 2
Electric motors or generators of open type | 40-B:C | 1 for each 2 motors or generators. 3
1 Not required where a fixed extinguishing system is installed.
2 When the installation is on the weather deck or open to the atmosphere at all times, then one 40-B extinguisher for every three engines is allowable.
3 Small electrical appliances, such as fans, are exempt.
[CGFR 56-4, 21 FR 903, Feb. 9, 1956, as amended by USCG-2012-0196, 81 FR 48243, July 22, 2016]
§ 145.15 Location and number of fire extinguishers required for vessels contracted for prior to August 22, 2016.
(a) Vessels contracted for prior to August 22, 2016 must meet the following requirements:
(1) Previously installed extinguishers with extinguishing capacities smaller than what is required in table 145.10(a) of this part need not be replaced and may be continued in service so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.
(2) All new equipment and installations must meet the applicable requirements in this part for new vessels.
(b) [Reserved]
[USCG-2012-0196, 81 FR 48243, July 22, 2016]
PART 146 OPERATIONS
Authority: 43 U.S.C. 1333, 1348, 1350, 1356; 46 U.S.C. 70001, 70116; sec. 109, Pub. L. 109-347, 120 Stat. 1884; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 78-160, 47 FR 9383, Mar. 4, 1982, unless otherwise noted.
Subpart A OCS Facilities
§ 146.1 Applicability.
Unless otherwise specified, the provisions of this subpart apply to OCS facilities except mobile offshore drilling units.
[USCG-2013-1057, 91 FR 39484, June 30, 2026]
§ 146.5 Person in charge.
(a) The owner or operator, or the agent of either of them, shall designate by title and in order of succession the persons on each OCS facility who shall be the “person in charge.”
(b) In case an emergency arises, nothing in the regulations in this subchapter shall be so construed as preventing the person in charge from pursuing the most effective action in that person's judgement for rectifying the conditions causing the emergency.
§ 146.10 Notice of new facilities.
(a) The owner or operator of each OCS facility not in operation before April 5, 1982 shall, at least 30 days before the date on-site construction of the facility is expected to commence, notify the District Commander for the area in which the facility will be located of:
(1) The position in which the facility will be operated;
(2) The designation assigned to the facility for identification under 30 CFR 250.37;
(3) The date when operation of the facility is expected to commence; and
(4) The date when the facility is expected to be available for inspection by the Coast Guard.
(b) The information required in paragraph (a) of this section may be submitted together with a need not repeat information submitted in connection with the application and notice requirements in 33 CFR part 67 for aids to navigation on the Outer Continental Shelf.
§ 146.15 Maintenance of emergency equipment.
(a) The emergency equipment provided, regardless of whether or not required by this subchapter, shall be maintained in good condition at all times. Good operating practices require replacement of expended equipment, as well as periodic renewal of those items which have a limited period of effectiveness.
(b) Each personal flotation device light that has a non-replaceable power source must be replaced on or before the expiration date of the power source.
(c) Each replaceable power source for a personal flotation device light must be replaced on or before its expiration date and the light must be replaced when it is no longer serviceable.
§ 146.20 Work vests.
(a) Types of approved work vests. Each buoyant work vest carried under the permissive authority of this section must be approved under—
(1) 46 CFR 160.053; or
(2) 46 CFR 160.077 as a commercial hybrid PFD.
(b) Use. Approved buoyant work vests are considered to be items of safety apparel and may be carried aboard OCS facilities to be worn by persons employed thereon when working near or over the water. The use and control of such vests shall be under the supervision of the person in charge of the facility. When carried, such vests shall not be accepted in lieu of any portion of the required number of approved life preservers and shall not be substituted for the approved life preservers required to be worn during drills and emergencies.
(c) Stowage. The work vests shall be stowed separately from the regular stowage of approved life preservers. The location for the stowage of work vests shall be such as not to be easily confused with that for approved life preservers.
(d) Inspections. Each work vest shall be subject to examination by a marine inspector to determine its serviceability. If found to be satisfactory, it may be continued in service, but shall not be stamped by a marine inspector with a Coast Guard stamp. If a work vest is found not to be in a serviceable condition, then such work vest shall be removed from the OCS facility. If a work vest is beyond repair, it shall be destroyed or mutilated in the presence of a marine inspector so as to prevent its continued use as a work vest.
(e) Additional requirements for hybrid work vests. Commercial hybrid PFD's must, in addition to the other requirements in this section, be—
(1) Used, stowed, and maintained in accordance with—
(i) The procedures set out in the manual required for these devices by 46 CFR 160.077-29; and
(ii) Any limitation(s) marked on them; and
(2) Of the same or similar design and have the same method of operation as each other hybrid PFD carried on board.
[CGD 78-160, 47 FR 9383, Mar. 4, 1982, as amended by CGD 78-174A, 51 FR 4339, Feb. 4, 1986]
§ 146.30 Notice of casualties.
(a) The owner, operator, or person in charge of a fixed OCS facility must ensure that the Coast Guard is notified as soon as possible after a casualty occurs, and by the most rapid means available, of each casualty involving the facility which results in:
(1) Death;
(2) Injury to five or more persons in a single incident;
(3) Damage affecting the usefulness of primary lifesaving or firefighting equipment;
(4) Injury causing any person to be incapacitated for more than 72 hours; or
(5) Damage to the facility exceeding $75,000 resulting from a collision by a vessel with the facility.
(b) The notice required by paragraph (a) of this section must identify the person giving the notice and the facility involved and describe, insofar as practicable, the nature of the casualty and the extent of injury to personnel and damage to property.
(c) Damage costs referred to in paragraph (a)(5) of this section include the cost of labor and material to restore the facility to the service condition which existed prior to the casualty, but does not include the cost of salvage, cleaning, or gas freeing of the facility.
(d) The owner, operator, or person in charge of any floating OCS facility must report casualties in accordance with 46 CFR part 4.
(e) The owner, operator, or person in charge of a foreign floating OCS facility must include in the written casualty report required under 46 CFR 4.05-12 information relating to alcohol or drug involvement.
[USCG-2013-1057, 91 FR 39484, June 30, 2026]
§ 146.35 Written report of casualty.
(a) In addition to the notice of a casualty required by § 146.30, the owner, operator, or person in charge shall, within 10 days of the casualty, submit to the Officer in Charge, Marine Inspection, a written report which:
(1) Identifies the facility involved, its owner, operator, and person in charge;
(2) Describes the casualty, including the date and time;
(3) Describes the nature and extent of injury to personnel and damage to property;
(4) Describes the factors which may have contributed to causing the casualty;
(5) Gives the name, address, and phone number of persons involved in or witnessing the casualty; and
(6) Gives any desired comments, especially with respect to use of or need for emergency equipment.
(7) Includes information relating to alcohol or drug involvement as specified in the vessel casualty reporting requirements of 46 CFR 4.05-12.
(b) The written report required by paragraph (a) of this section may be—
(1) In narrative form if all appropriate parts of Form CG-2692 are addressed;
(2) On Form CG-2692 for casualties resulting in property damage, personnel injury, or loss of life.
(c) If filed or postmarked within 5 days of the casualty, the written report required by paragraph (a) of this section serves as the notice required by § 146.30(b).
(Approved by the Office of Management and Budget under control number 1625-0001)
[CGD 78-160, 47 FR 9383, Mar. 4, 1982, as amended by CGD 82-023a, 47 FR 35741, Aug. 16, 1982; CGD 82-023a, 48 FR 43174, Sept. 22, 1983; CGD 84-099, 52 FR 47533, Dec. 14, 1987; USCG-2006-25150, 71 FR 39209, July 12, 2006]
§ 146.40 Diving casualties.
Diving related casualties are reported in accordance with 46 CFR 197.484 and 197.486.
§ 146.45 Pollution incidents.
Oil pollution incidents involving an OCS facility are reported in accordance with §§ 135.305 and 135.307 of this chapter. Additional provisions concerning liability and compensation because of oil pollution are contained in Subchapter M of this chapter.
Subpart B Manned OCS Facilities
§ 146.101 Applicability.
The provisions of this subpart apply only to manned OCS facilities except mobile offshore drilling units.
§ 146.102 Definitions.
For the purpose of this subpart:
Arrives on the OCS means when a floating facility enters any OCS block area for the purpose of engaging in operations subject to the jurisdiction of the OCS Lands Act.
OCS block area means the names given by the Bureau of Ocean Energy Management, (BOEM) to define the OCS areas used to facilitate management or leasing on the OCS.
U.S., as used in the term, “U.S. floating facility,” means a “floating facility,” that is registered, documented, or certificated under the laws of the United States or that is not registered, documented, or certificated under the laws of the United States or any other nation.
[USCG-2008-1088, 76 FR 2260, Jan. 13, 2011, as amended by USCG-2013-0797, 79 FR 36405, June 27, 2014]
§ 146.103 Safety and Security notice of arrival for U.S. floating facilities.
(a) General. At least 96 hours before a U.S. floating facility arrives on the OCS from a foreign port or place or from a different OCS block area, excluding those U.S. floating facilities arriving directly from a U.S. port or place, to engage in OCS activities, the owner or operator of the floating facility, except as provided in paragraph (f) of this section, must submit the following information to the National Vessel Movement Center (NVMC):
(1) The location, latitude and longitude, of the floating facility at the time the notice of arrival (NOA) is reported;
(2) The area designation, block number or lease number, assigned under 30 CFR 250.154 for identification, where the owner or operator of the floating facility plans to perform OCS activities;
(3) The floating facility's name, if any;
(4) The date when OCS operations of the floating facility are expected to begin and end;
(5) Names of the last two ports or places visited and the associated dates of arrival and departure;
(6) The following information for each individual onboard:
(i) Full name;
(ii) Date of birth;
(iii) Nationality;
(iv) Passport number or marine documentation number (type of identification and number);
(v) Position or duties on the floating facility; and
(vi) Name of the port, or place, and country where the individual embarked.
(b) Methods of submission. The notice must be submitted to the NVMC by electronic Notice of Arrival and Departure format using methods specified in the NVMC's Web site at http://www.nvmc.uscg.gov/.
(c) Updates to a submitted NOA. Unless otherwise specified in this section, whenever the most recently submitted NOA information becomes inaccurate, the owner or operator of a U.S. floating facility must revise and re-submit the NOA within the times required in paragraph (e) of this section. An owner or operator does not need to revise or re-submit an NOA for the following:
(1) A change in submitted arrival time that is less than 6 hours;
(2) Changes in the location, latitude and longitude, of the floating facility from the location at the time the NOA was reported; or
(3) Changes to personnel positions or duties on the floating facility.
(d) Required reporting time of an initial NOA. The owner or operator of a U.S. floating facility subject to this section must submit an initial NOA:
(1) If the voyage time is more than 96 hours, owners or operators of a floating facility must submit an initial NOA at least 96 hours before the U.S. floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(2) If the voyage time is less than 96 hours, owners and operators of a floating facility must submit an initial NOA at least 24 hours before the U.S. floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities.
(e) Required reporting time of an update to an NOA. The owner or operator of each floating facility subject to this section must submit an NOA update:
(1) If the most recently submitted NOA, or NOA update, differs by 24 hours or more from the current estimated time of arrival, the owner or operator of the floating facility must provide an updated NOA as soon as practicable but at least 24 hours before the U.S. floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(2) If the most recently submitted NOA, or NOA update, differs by less than 24 hours from the current estimated time of arrival, the owner or operator of the floating facility must provide an update as soon as practicable but at least 12 hours before the U.S. floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities.
(f) Towing vessels. When a towing vessel controls a U.S. floating facility required to submit an NOA under this subpart, the owner or operator of the towing vessel, or lead towing vessel if there is more than one, is responsible for submitting only one NOA containing the NOA information items required for the towing vessels, under § 146.405, and the U.S. floating facility under paragraph (a) of this section.
(g) This section does not apply to U.S. floating facilities merely transiting the waters superjacent to the OCS and not engaged in OCS activities.
[USCG-2008-1088, 76 FR 2260, Jan. 13, 2011]
§ 146.104 Safety and Security notice of arrival for foreign floating facilities.
(a) General. At least 96 hours before a foreign floating facility arrives on the OCS from a foreign port or place or from a different OCS block area to engage in OCS activities, the owner or operator of the floating facility, except as provided in paragraph (f) of this section, must submit the following information to the National Vessel Movement Center (NVMC):
(1) The location, latitude and longitude, of the foreign floating facility at the time the NOA is reported;
(2) The area designation, block number or lease number, assigned under 30 CFR 250.154 for identification, where the owner or operator of the foreign floating facility plans to perform OCS activities;
(3) The foreign floating facility's name, if any;
(4) The date when OCS operations of the foreign floating facility are expected to begin and end;
(5) Names of the last two ports or places visited and the associated dates of arrival and departure;
(6) The following information for each individual onboard:
(i) Full name;
(ii) Date of birth;
(iii) Nationality;
(iv) Passport number or marine documentation number (type of identification and number);
(v) Position or duties on the foreign floating facility; and
(vi) Name of the port, or place, and country where the individual embarked.
(7) The date of issuance of the foreign floating facility's International Safety Management certificate (ISM), if any, and Document of Compliance certificate and the name of the flag administration, or its recognized representative, that issued those certificates; and
(8) The date of issuance of the foreign floating facility's International Ship Security certificate (ISSC), if any, and the name of the flag administration, or the recognized security organization representing the flag administration, that issued the ISSC.
(b) Methods of submission. The notice must be submitted to the National Vessel Movement Center by electronic Notice of Arrival and Departure format using methods specified at the NVMC's Web site at http://www.nvmc.uscg.gov/.
(c) Updates to a submitted NOA. Unless otherwise specified in this section, whenever the most recently submitted NOA information becomes inaccurate, the owner or operator of the foreign floating facility must revise and re-submit the NOA within the times required in paragraph (e) of this section. An owner or operator does not need to revise or re-submit an NOA for the following:
(1) A change in submitted arrival time that is less than 6 hours;
(2) Changes in the location, latitude and longitude, of the floating facility from the location at the time the NOA was reported; or
(3) Changes to personnel positions or duties on the foreign floating facility.
(d) Required reporting time of an initial NOA. The owner or operator of a foreign floating facility subject to this section must submit an initial NOA:
(1) If the voyage time is more than 96 hours, owners or operators of a foreign floating facility must submit an initial NOA at least 96 hours before the foreign floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(2) If the voyage time is less than 96 hours, the owner or operator of a foreign floating facility must submit an initial NOA at least 24 hours before the foreign floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities.
(e) Required reporting time of an update to an NOA. The owner or operator of a foreign floating facility subject to this section must submit an NOA update:
(1) If the most recently submitted NOA, or NOA update, differs by 24 hours or more from the current estimated time of arrival, the owner or operator of the foreign floating facility must provide an updated NOA as soon as practicable but at least 24 hours before the floating facility arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(2) If the most recently submitted NOA, or NOA update, differs by less than 24 hours from the current estimated time of arrival, the owner or operator of the foreign floating facility must provide an updated NOA as soon as practicable but at least 12 hours before the floating facility arrives at the OCS location where owners or operators plan to perform OCS activities.
(f) Towing vessels. When a towing vessel controls a foreign floating facility required to submit an NOA under this subpart, the owner or operator of the towing vessel, or lead towing vessel if there is more than one, is responsible for submitting only one NOA containing the NOA information items required for towing vessels, under § 146.405, and the foreign floating facility under paragraph (a) of this section.
(g) This section does not apply to a foreign floating facility merely transiting the waters superjacent to the OCS and not engaged in OCS activities.
[USCG-2008-1088, 76 FR 2261, Jan. 13, 2011]
§ 146.105 General alarm system.
Each manned facility must have a general alarm system. When operated, this system shall be audible in all parts of the structure on which provided.
§ 146.110 Emergency signals.
(a) The owner, the owner's agent, or the person in charge shall establish emergency signals to be used for calling the personnel to their emergency stations.
(b) The signal to man emergency stations shall be an intermittent signal on the general alarm system for not less than 10 seconds. The abandon facility signal shall be a continuous signal on the general alarm system.
§ 146.115 Duties of personnel during an emergency.
(a) The owner, the owner's agent, or the person in charge shall assign to each person on a manned facility special duties and duty stations so that in event an emergency arises confusion will be minimized and no delay will occur with respect to the use or application of equipment required by this subchapter. The duties shall, as far as possible, be comparable with the regular work of the individual.
(b) The duties shall be assigned as necessary for the proper handling of any emergency, and shall include the following:
(1) The closing of air ports, watertight doors, scuppers, and sanitary and other discharges which lead through the facility's hull.
(2) The stopping of fans and ventilation systems.
(3) The donning of life preserves.
(4) The preparation and launching of life floats, lifeboats, or life rafts.
§ 146.120 Manning of survival craft.
The owner, the owner's agent, or the person in charge shall assign a person to each life float, lifeboat, life raft, or survival capsule who shall be responsible for launching it in event of an emergency.
§ 146.125 Emergency drills.
(a) Emergency drills shall be conducted at least once each month by the person in charge of the manned facility. The drill shall be conducted as if an actual emergency existed. All personnel should report to their respective stations and be prepared to perform the duties assigned to them.
(b) The person in charge and conducting the emergency drill shall instruct the personnel as necessary to insure that all persons are familiar with their duties and stations.
(c) Emergency evacuation drills. The following emergency evacuation drills must be conducted:
(1) At least once a year, all the elements of the Emergency Evacuation Plan (EEP) under § 146.140 relating to the evacuation of personnel from the facility must be exercised through a drill or a series of drills. The drill(s) must exercise all of the means and procedures listed in the EEP for each circumstance and condition described in the EEP under § 146.140(d)(9).
(2) At least once a month, a drill must be conducted that demonstrates the ability of the facility's personnel to perform their duties and functions on the facility, as those duties and functions are described in the EEP. If a standby vessel is designated for that facility in the EEP, the vessel must be positioned as described in the EEP for an evacuation of that facility and the vessel's crew must demonstrate its ability to perform its duties and functions under the EEP.
(d) The date and time of such drills shall be reported in writing by the person in charge at the time of the drill to the owner who shall maintain this report record for a year and furnish it upon request to the Coast Guard. After one year, such records may be destroyed. When it is impossible to conduct emergency drills as required by this section during a particular calendar month, during the following month, a written report by the owner shall be submitted to the Officer in Charge, Marine Inspection, stating why the drills could not be conducted.
(Approved by the Office of Management and Budget under control number 1625-0018)
[CGD 78-160, 47 FR 9383, Mar. 4, 1982, as amended by CGD 84-098b, 54 FR 21572, May 18, 1989; USCG-2006-25150, 71 FR 39209, July 12, 2006]
§ 146.130 Station bill.
(a) The person in charge of each manned platform shall be responsible for and have prepared a station bill (muster list). This station bill must be signed by the person in charge. Copies shall be duly posted in conspicuous locations on the manned platform.
(b) The station bill shall set forth the special duties and duty stations of each member of the personnel for any emergency which involves the use or application of equipment required by this subchapter. In addition, it shall contain all other duties assigned and considered as necessary for the proper handling of other emergencies.
(c) The station bill shall contain the various signals to be used for calling the personnel to their emergency stations, and to abandon the facility.
(Approved by the Office of Management and Budget under OMB control number 2115-0542)
[CGD 78-160, 47 FR 9383, Mar. 4, 1982, as amended by CGD 86-011, 51 FR 5712, Feb. 18, 1986]
§ 146.135 Markings for emergency equipment.
(a) Markings shall be provided as considered necessary for the guidance of persons on manned facilities.
(b) The general alarm bell switches shall be identified by red letters at least one inch high with a contrasting background: “General Alarm.”
(c) All general alarm bells shall be identified by a sign at each bell in red letters at least one inch high with a sharp contrasting background: “General Alarm—When Bell Rings Go to Your Station.
(d) All life floats, lifeboats, life rafts, and survival capsules, together with paddles or oars, shall be conspicuously marked with a name or number of, or other inscription identifying, the facility on which placed. The number of persons allowed on each life float, lifeboat, or life raft shall be conspicuously marked thereon in letters and numbers 1 1/2 inches high. These numbers shall be placed on both sides of the life float, lifeboat, or life raft. Inflatable life rafts shall be marked in accordance with subpart 160.051 of 46 CFR part 160 and no additional markings are required.
(e) All life preservers and ring life buoys shall be marked with the name or number of, or other inscription identifying, the facility on which placed except those which accompany mobile crews to unmanned platforms may be marked with the operator's name and field designation.
§ 146.140 Emergency Evacuation Plan.
(a) The operator of each manned OCS facility shall develop an Emergency Evacuation Plan (EEP) for the facility which addresses all of the items listed in paragraph (d) of this section. The EEP may apply to more than one facility, if the facilities are located in the same general geographic location and within the same Coast Guard Officer in Charge, Marine Inspection (OCMI) zone; if each facility covered by the EEP is specifically identified in the EEP; and if the evacuation needs of each facility are accommodated. The EEP must be submitted to the OCMI having jurisdiction over the facility, 30 days before placing the facility in operation. The OCMI reviews the EEP to determine whether all items listed in paragraph (d) of this section are addressed for each facility included in the EEP. If the OCMI determines that all items in paragraph (d) of this section are addressed, the OCMI stamps the EEP “APPROVED” and returns it, together with a letter indicating Coast Guard approval, to the operator. If the OCMI determines that any item is not addressed, the OCMI stamps the EEP “RETURNED FOR REVISION” and returns the EEP, together with an explanation of the EEP's deficiencies, to the operator.
(b) Once the EEP is approved under paragraph (a) of this section, the facility operator shall ensure that a copy of the EEP and the letter indicating Coast Guard approval is maintained on the facility.
(c) The EEP must be resubmitted for approval when substantive changes are made to the EEP. Only the pages affected by a change need be resubmitted if the EEP is bound in such a way as to allow old pages to be removed easily and new ones inserted. Substantive changes include, but are not limited to, installation of a new facility within the area covered by an EEP, relocation of a MODU, changes in the means or methods of evacuation, or changes in the time required to accomplish evacuation.
(d) The EEP must, at a minimum,
(1) Be written in language that is easily understood by the facility's operating personnel;
(2) Have a table of contents and general index;
(3) Have a record of changes;
(4) List the name, telephone number, and function of each person to be contacted under the EEP and state the circumstances in which that person should be contacted;
(5) List the facility's communications equipment, its available frequencies, and the communications schedules with shore installations, standby vessels, rescue aircraft, and other OCS facilities specified in the EEP;
(6) Identify the primary source of weather forecasting relied upon in implementing the EEP and state the frequency of reports when normal weather is forecasted, the frequency of reports when heavy weather is forecasted, and the method of transmitting the reports to the facility;
(7) Designate the individual on each facility covered by the EEP who is assigned primary responsibility for implementing the EEP;
(8) Designate those facility and shoreside support personnel who have the authority to advise the person in charge of the facility as to the best course of action to be taken and who initiate actions to assist facility personnel;
(9) Describe the recognized circumstances, such as fires or blowouts, and environmental conditions, such as approaching hurricanes or ice floes, in which the facility or its personnel would be placed in jeopardy and a mass evacuation of the facility's personnel would be recommended;
(10) For each of the circumstances and conditions described under paragraph (d)(9) of this section, list the pre-evacuation steps for securing operations, whether drilling or production, including the time estimates for completion and the personnel required;
(11) For each of the circumstances and conditions described under paragraph (d)(9) of this section, describe the order in which personnel would be evacuated, the transportation resources to be used in the evacuation, the operational limitations for each mode of transportation specified, and the time and distance factors for initiating the evacuation; and
(12) For each of the circumstances and conditions described under paragraph (d)(9) of this section, identify the means and procedures—
(i) For retrieving persons from the water during an evacuation;
(ii) For transferring persons from the facility to designated standby vessels, lifeboats, or other types of evacuation craft;
(iii) For retrieving persons from designated standby vessels, lifeboats, or other types of evacuation craft if used; and
(iv) For the ultimate evacuation of all persons on the facility to land, another facility, or other location where the evacuees would be reasonably out of danger under the circumstance or condition being addressed.
(e) The operator shall ensure that—
(1) All equipment specified in the EEP, whether the equipment is located on or off of the facility, is made available and located as indicated in the EEP and is designed and maintained so as to be capable of performing its intended function during an emergency evacuation;
(2) All personnel specified in the EEP are available and located as specified in the EEP and are trained in fulfilling their role under the EEP; and
(3) Drills are conducted in accordance with § 146.125(c).
(f) A complete copy of the EEP must be made available to the facility's operating personnel and a brief written summary of, or an oral briefing on, the EEP must be given to each person newly reporting on the facility.
(g) A copy of the EEP must be on board each standby vessel, if any, designated in the EEP and provided to all shoreside support personnel, if any, specified in the EEP.
[CGD 84-098b, 54 FR 21572, May 18, 1989, as amended by USCG-1998-3799, 63 FR 35530, June 30, 1998]
Subpart C Mobile Offshore Drilling Units
§ 146.200 Definitions.
For the purpose of this subpart:
Arrives on the OCS means when a MODU enters any OCS block area for the purpose of engaging in operations subject to the jurisdiction of the OCS Lands Act.
OCS block area means the names given by the Bureau of Ocean Energy Management, (BOEM) to define the OCS areas used to facilitate management or leasing on the OCS.
[USCG-2008-1088, 76 FR 2262, Jan. 13, 2011, as amended by USCG-2013-0797, 79 FR 36405, June 27, 2014]
§ 146.201 Applicability.
This subpart applies to mobile offshore drilling units engaged in OCS activities.
§ 146.202 Notice of arrival or relocation of MODUs on the OCS.
(a) The owner of any mobile offshore drilling unit engaged in OCS activities shall, 14 days before arrival of the unit on the OCS or as soon thereafter as practicable, notify the District Commander for the area in which the unit will operate of:
(1) The unit's name, nationality, and designation assigned for identification under 30 CFR 250.37;
(2) The location and year that the unit was built;
(3) The name and address of the owner, and the owner's local representative, if any;
(4) Classification or inspection certificates currently held by the unit;
(5) The location and date that operations are expected to commence and their anticipated duration; and
(6) The location and date that the unit will be available and ready for inspection by the Coast Guard.
(b) Once a unit is located on the OCS, the owner of the unit shall notify the District Commander before relocating the unit.
(c) The information required in paragraphs (a) and (b) of this section may be provided by telephone or may be submitted together with, and need not repeat information contained in, applications and notices under 33 CFR part 67 for aids to navigation on the Outer Continental Shelf or 33 CFR part 135 for applications for certificate of financial responsibility.
§ 146.203 Requirements for U.S. and undocumented MODUs.
Each mobile offshore drilling unit documented under the laws of the United States and each mobile offshore drilling unit that is not documented under the laws of any nation must comply with the operating standards of 46 CFR part 109 when engaged in OCS activities.
§ 146.205 Requirements for foreign MODUs.
Each mobile offshore drilling unit that is documented under the laws of a foreign nation must, when engaged in OCS activities, comply with one of the following:
(a) The operating standards of 46 CFR part 109.
(b) The operating standards of the documenting nation if the standards provide a level of safety generally equivalent to or greater than that provided under 46 CFR part 109.
(c) The operating standards for mobile offshore drilling units contained in the International Maritime Organization (IMO, formerly Inter-Governmental Maritime Consultative Organization or IMCO) (IMO) Code for the Construction and Equipment of Mobile Offshore Drilling Units (IMO Assembly Resolution A. 414(XI)) which has been incorporated by reference and the requirements of 46 CFR part 109 for matters not addressed by the Code.
§ 146.210 Emergency Evacuation Plan.
(a) Except as otherwise provided in this section, the requirements applicable to Emergency Evacuation Plans (EEPs) on manned OCS facilities under § 146.140 are applicable to MODUs.
(b) An EEP must be submitted by—
(1) The holder of a lease or permit under the Act for each MODU within the area of the lease or the area covered by the permit; or
(2) The operator under 30 CFR 250.2(gg), if other than the holder of a lease or permit, for each MODU within the area in which the operator controls or manages operations.
(c) To avoid unnecessary duplication, the EEP may incorporate by reference pertinent sections of the MODU's operating manual required by 46 CFR 109.121.
(d) In complying with § 146.140(d)(7), the EEP must designate the master or person in charge of the MODU under 46 CFR 109.107 as the individual who is assigned primary responsibility for implementing the EEP, as it relates to that MODU.
[CGD 84-098b, 54 FR 21573, May 18, 1989]
§ 146.215 Safety and Security notice of arrival for U.S. or foreign MODUs.
(a) General. At least 96 hours before a MODU arrives on the OCS from a foreign port or place or from a different OCS block area to engage in OCS activities, excluding those U.S. MODUs arriving directly from a U.S. port or place or from an OCS block area, to engage in OCS activities, the owner or operator of the MODU, except as provided in paragraph (f) of this section, must submit the following information to the National Vessel Movement Center (NVMC):
(1) The location, latitude and longitude, of the MODU at the time the notice of arrival (NOA) is reported;
(2) The area designation, block number or lease number, assigned under 30 CFR 250.154 for identification, where the MODU owner or operator plans to perform OCS activities;
(3) The MODU's name and IMO number, if any;
(4) The date when operations of the MODU are expected to begin and end;
(5) Names of the last two ports or places visited and the associated dates of arrival and departure;
(6) The following information for each individual onboard:
(i) Full name;
(ii) Date of birth;
(iii) Nationality;
(iv) Passport number or marine documentation number (type of identification and number);
(v) Position or duties on the MODU; and
(vi) Name of the port, or place, and country where the individual embarked.
(7) The date of issuance of the MODU's International Safety Management certificate (ISM), if any, and Document of Compliance certificate and the name of the flag administration, or its recognized representative, that issued those certificates; and
(8) The date of issuance of the MODU's International Ship Security certificate (ISSC), if any, and the name of the flag administration, or the recognized security organization representing the flag administration, that issued the ISSC.
(b) Methods of submission. The notice must be submitted to the National Vessel Movement Center (NVMC) by electronic Notice of Arrival and Departure format using methods specified in the NVMC's Web site at http://www.nvmc.uscg.gov/.
(c) Updates to a submitted NOA. Unless otherwise specified in this section, whenever the most recently submitted NOA information becomes inaccurate, the owner or operator of the MODU must revise and re-submit the NOA within the times required in paragraph (e) of this section. An owner or operator does not need to revise or re-submit an NOA for the following:
(1) A change in submitted arrival time that is less than 6 hours;
(2) Changes in the location, latitude and longitude, of the MODUs from the location at the time the NOA was reported; or
(3) Changes to personnel positions or duties on the MODU.
(d) Required reporting time of an initial NOA. The owner or operator of a MODU subject to this section must submit an initial NOA:
(1) If the voyage time is more than 96 hours, owners and operators of a MODU must submit an initial NOA at least 96 hours before the MODU arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(2) If the voyage time is less than 96 hours, owners and operators of a MODU must submit an initial NOA at least 24 hours before the MODU arrives at the OCS location where the owner or operator plans to perform OCS activities.
(e) Required reporting time of an update to an NOA. The owner or operator of a MODU subject to this section must submit an NOA update:
(1) If the most recently submitted NOA, or NOA update, differs by 24 hours or more from the current estimated time of arrival, the owner or operator of the MODU must provide an updated NOA as soon as practicable but at least 24 hours before the MODU arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(2) If the most recently submitted NOA, or NOA update, differs by less than 24 hours from the current estimated time of arrival, the owner or operator of the MODU must provide an updated NOA as soon as practicable but at least 12 hours before the MODU arrives at the OCS location where the owner or operator plans to perform OCS activities.
(f) Towing vessels. When a towing vessel controls a MODU required to submit an NOA under this subpart, the owner or operator of the towing vessel, or lead towing vessel if there is more than one, is responsible for submitting only one NOA containing the information required for the towing vessels, under § 146.405, and the MODU under paragraph (a) of this section.
(g) This section does not apply to MODU's merely transiting the waters superjacent to the OCS and not engaged in OCS activities.
[USCG-2008-1088, 76 FR 2262, Jan. 13, 2011, as amended by USCG-2013-0797, 79 FR 36405, June 27, 2014]
Subpart D Vessels, including MODUs—Notice of Casualty
Source: USCG-2013-1057, 91 FR 39484, June 30, 2026, unless otherwise noted.
§ 146.301 Applicability.
This subpart applies to vessels, including MODUs, engaged in OCS activities other than U.S. vessels already required to report marine casualties under 46 CFR part 4 or subpart D of 46 CFR part 109.
§ 146.303 Notice and written report of casualties.
The owner, operator, or person in charge of a vessel, including a MODU, engaged in OCS activities must ensure compliance with the notice of casualty requirements in 46 CFR part 4.
Subpart E Vessels—Safety and Security Notice of Arrival
Source: USCG-2008-1088, 76 FR 2262, Jan. 13, 2011, unless otherwise noted.
§ 146.401 Applicability.
This subpart applies to all U.S. and foreign vessels, except those U.S. vessels traveling directly from a U.S. port or place, or from an OCS block area, bound for a place on the OCS and planning to engage in OCS activities. Vessels under this subpart include, but are not limited to, standby vessels, attending vessels, offshore supply vessels, pipelay vessels, derrick ships, diving support vessels, oceanographic research vessels, towing vessels, and accommodation vessels. This subpart does not apply to MODUs, which are covered under § 146.215; nor does it apply to floating facilities, which are covered under §§ 146.103 and 146.104.
[USCG-2008-1088, 76 FR 2262, Jan. 13, 2011, as amended by USCG-2013-0797, 79 FR 36405, June 27, 2014]
§ 146.402 Definitions.
For the purpose of this subpart:
Arrives on the OCS means when a vessel enters any OCS block area to commence operations for which it has submitted a Notice of Arrival under § 146.405(b)(2).
OCS block area means the names given by the Bureau of Ocean Energy Management, (BOEM) to define the OCS areas used to facilitate management or leasing on the OCS.
[USCG-2008-1088, 76 FR 2262, Jan. 13, 2011, as amended by USCG-2013-0797, 79 FR 36405, June 27, 2014]
§ 146.405 Safety and Security notice of arrival for vessels arriving at a place on the OCS.
(a) General. The owner or operator of each vessel subject to this section must submit an initial NOA to the National Vessel Movement Center (NVMC):
(1) If the voyage time is more than 96 hours, at least 96 hours before the vessel arrives at a place on the OCS from a foreign port or place or from a different OCS block area to engage in OCS activities;
(2) If the voyage time is less than 96 hours and more than 24 hours, before departure, or;
(3) If the voyage time is less than 24 hours, at least 24 hours before the vessel arrives at a place on the OCS.
(b) Information required in an NOA. The following information is required from the owners or operators of vessels submitting an NOA:
(1) All the information specified in 33 CFR Table 160.206 with the exception of information required in items (2)(iii) through (2)(vi) and item (6). Item (8) is also not required except as pursuant to the laws on vessel entry (19 U.S.C. 1434) and clearance (46 U.S.C. 60105). Vessel owners and operators should protect any personal information they gather in preparing notices for transmittal to the NVMC so as to prevent unauthorized disclosure of that information;
(2) The area in which they are conducting their operations. This area can be submitted as either the name of the places, the BOEM block numbers, or the latitudes and longitudes of the places on the OCS where operations are being conducted; and
(3) If any person onboard, including a crewmember, is not required to carry a passport for travel, then passport information required in Table 160.206, items (4)(iv) through (vi), and (5)(iv) through (vi), need not be provided for that person.
(c) Updates to a submitted NOA. Unless otherwise specified in this section, whenever the most recently submitted NOA information becomes inaccurate, the owner or operator of that vessel must revise and re-submit the NOA within the times required in paragraph (e) of this section. An owner or operator does not need to revise and re-submit an NOA for the following:
(1) A change in submitted arrival time that is less than 6 hours;
(2) Changes in the location, latitude and longitude, of the vessel from the location at the time the NOA was reported; or
(3) Changes to personnel positions or duties on the vessel.
(d) Methods of submission. The notice must be submitted to the NVMC by electronic Notice of Arrival and Departure format using methods specified at the NVMC's Web site at http://www.nvmc.uscg.gov/.
(e) Required reporting time of an NOA update. The owner or operator of each vessel subject to this section must submit an NOA update:
(1) If the most recently submitted NOA, or NOA update, differs by 24 hours or more from the current estimated time of arrival, the owner or operator of the vessel must provide an update as soon as practicable but at least 24 hours before the vessel arrives at the OCS location where the owner or operator plans to perform OCS activities;
(2) If the most recently submitted NOA, or NOA update, differs by less than 24 hours from the current estimated time of arrival, the owner or operator of the vessel must provide an update as soon as practicable but at least 12 hours before the vessel arrives at the OCS location where the owner or operator plans to perform OCS activities; or
(3) If the remaining voyage time is less than 24 hours, the owner or operator of the vessel must provide an update as soon as practicable, but at least 12 hours before the vessel arrives at a place on the OCS.
(f) Towing vessels. When a towing vessel controls a vessel required to submit an NOA under this subpart, the owner or operator of the towing vessel, or lead towing vessel if there is more than one, is responsible for submitting only one NOA containing the information required for the towing vessels and the vessel under its control.
(g) This section does not apply to vessels merely transiting the waters superjacent to the OCS and not engaged in OCS activities.
[USCG-2008-1088, 76 FR 2262, Jan. 13, 2011, as amended by USCG-2013-0797, 79 FR 36405, June 27, 2014]
PART 147 SAFETY ZONES
Authority: 14 U.S.C. 544; 43 U.S.C. 1333; 33 CFR 1.05-1; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 78-160, 47 FR 9386, Mar. 4, 1982, unless otherwise noted.
Editorial Note: Nomenclature changes to part 147 appear by USCG-2025-0186, 90 FR 12238, Mar. 17, 2025, and by USCG-2025-0716, 90 FR 47585-47586, Oct. 2, 2025.
§ 147.1 Purpose of safety zones.
Safety zones may be established around OCS facilities being constructed, maintained, or operated on the Outer Continental Shelf to promote the safety of life and property on the facilities, their appurtenances and attending vessels, and on the adjacent waters within the safety zones. Regulations adopted for safety zones may extend to the prevention or control of specific activities and access by vessels or persons, and include measures to protect the living resources of the sea from harmful agents. The regulations do not encompass the operating equipment or procedures used in the drilling for and production of oil, gas, or other minerals, or the transportation of oil, gas, or other minerals by pipeline except as they relate to the safety of life and property on OCS facilities and on the waters adjacent to OCS facilities or to the protection of the living resources of the sea within a safety zone from harmful agents.
§ 147.T01-0056 Safety Zone; Sunrise Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0487, Massachusetts, New York, and Rhode Island, Atlantic Ocean.
(a) Description. Each of the areas within 500-meters of the center point of the positions provided in the table below, expressed in Degrees (°) Minutes (′) Seconds (″) (DMS) based on North American Datum 1983 (NAD 83), constitutes a safety zone.
Table 1 to Paragraph (a)
Name | Facility type | Latitude | Longitude
AR16 | WTG | 41°02′47.4″ N | 70°56′48.1″ W
AS01 | WTG | 41°01′25.3″ N | 71°16′34.3″ W
AS02 | WTG | 41°01′26.4″ N | 71°15′16.2″ W
AS03 | WTG | 41°01′28.6″ N | 71°13′55.2″ W
AS04 | WTG | 41°01′29.3″ N | 71°12′36.4″ W
AS05 | WTG | 41°01′28.2″ N | 71°11′18.6″ W
AS06 | WTG | 41°01′29.6″ N | 71°09′58.7″ W
AS07 | WTG | 41°01′34.3″ N | 71°08′39.5″ W
AS08 | OSS | 41°01′36.1″ N | 71°07′20.6″ W
AS09 | WTG | 41°01′33.6″ N | 71°06′00.7″ W
AS10 | WTG | 41°01′39.0″ N | 71°04′41.5″ W
AS11 | WTG | 41°01′40.1″ N | 71°03′18.7″ W
AS12 | WTG | 41°01′41.9″ N | 71°02′03.1″ W
AS13 | WTG | 41°01′43.3″ N | 71°00′43.9″ W
AS14 | WTG | 41°01′44.4″ N | 70°59′24.7″ W
AS15 | WTG | 41°01′45.8″ N | 70°58′05.5″ W
AS16 | WTG | 41°01′48.7″ N | 70°56′46.7″ W
AS17 | WTG | 41°01′48.7″ N | 70°55′26.8″ W
AS18 | WTG | 41°01′48.0″ N | 70°54′09.4″ W
AS19 | WTG | 41°01′51.2″ N | 70°52′49.1″ W
AS20 | WTG | 41°01′52.7″ N | 70°51′26.3″ W
AT01 | WTG | 41°00′25.6″ N | 71°16′32.5″ W
AT02 | WTG | 41°00′27.0″ N | 71°15′14.0″ W
AT04 | WTG | 41°00′30.2″ N | 71°12′35.3″ W
AT05 | WTG | 41°00′31.7″ N | 71°11′16.1″ W
AT06 | WTG | 41°00′33.1″ N | 71°09′56.9″ W
AT07 | WTG | 41°00′34.6″ N | 71°08′37.7″ W
AT08 | WTG | 41°00′36.0″ N | 71°07′18.5″ W
AT09 | WTG | 41°00′38.9″ N | 71°06′00.4″ W
AT10 | WTG | 41°00′38.9″ N | 71°04′39.7″ W
AT11 | WTG | 41°00′36.7″ N | 71°03′20.5″ W
AT12 | WTG | 41°00′41.8″ N | 71°02′01.3″ W
AT13 | WTG | 41°00′43.2″ N | 71°00′42.1″ W
AT14 | WTG | 41°00′43.9″ N | 70°59′22.6″ W
AT15 | WTG | 41°00′45.7″ N | 70°58′03.7″ W
AT16 | WTG | 41°00′47.2″ N | 70°56′44.5″ W
AT17 | WTG | 41°00′49.0″ N | 70°55′25.7″ W
AT18 | WTG | 41°00′49.7″ N | 70°54′05.8″ W
AT19 | WTG | 41°00′51.1″ N | 70°52′46.6″ W
AT20 | WTG | 41°00′52.6″ N | 70°51′31.3″ W
AU01 | WTG | 40°59′25.1″ N | 71°16′30.7″ W
AU02 | WTG | 40°59′26.9″ N | 71°15′11.2″ W
AU04 | WTG | 40°59′30.1″ N | 71°12′33.1″ W
AU05 | WTG | 40°59′31.6″ N | 71°11′13.9″ W
AU06 | WTG | 40°59′33.0″ N | 71°09′54.7″ W
AU07 | WTG | 40°59′34.4″ N | 71°08′35.5″ W
AU09 | WTG | 40°59′37.3″ N | 71°05′57.1″ W
AU10 | WTG | 40°59′38.8″ N | 71°04′37.6″ W
AU11 | WTG | 40°59′41.3″ N | 71°03′15.5″ W
AU12 | WTG | 40°59′42.4″ N | 71°01′59.2″ W
AU13 | WTG | 40°59′43.1″ N | 71°00′40.3″ W
AU14 | WTG | 40°59′44.5″ N | 70°59′21.1″ W
AU15 | WTG | 40°59′44.2″ N | 70°58′00.1″ W
AU16 | WTG | 40°59′47.0″ N | 70°56′42.7″ W
AU17 | WTG | 40°59′48.5″ N | 70°55′23.5″ W
AU18 | WTG | 40°59′49.9″ N | 70°54′04.3″ W
AU19 | WTG | 40°59′52.8″ N | 70°52′45.1″ W
AU21 | WTG | 40°59′53.5″ N | 70°50′09.6″ W
AV01 | WTG | 40°58′25.7″ N | 71°16′28.9″ W
AV02 | WTG | 40°58′27.1″ N | 71°15′09.7″ W
AV03 | WTG | 40°58′28.6″ N | 71°13′50.5″ W
AV04 | WTG | 40°58′30.0″ N | 71°12′31.3″ W
AV05 | WTG | 40°58′31.4″ N | 71°11′12.1″ W
AV06 | WTG | 40°58′32.9″ N | 71°09′52.9″ W
AV07 | WTG | 40°58′34.7″ N | 71°08′33.7″ W
AV08 | WTG | 40°58′36.1″ N | 71°07′14.5″ W
AV09 | WTG | 40°58′37.6″ N | 71°05′55.3″ W
AV10 | WTG | 40°58′39.0″ N | 71°04′36.1″ W
AV11 | WTG | 40°58′40.4″ N | 71°03′17.3″ W
AV12 | WTG | 40°58′41.2″ N | 71°01′57.7″ W
AV13 | WTG | 40°58′43.0″ N | 71°00′38.5″ W
AV17 | WTG | 40°58′48.4″ N | 70°55′21.7″ W
AW01 | WTG | 40°57′25.6″ N | 71°16′26.8″ W
AW02 | WTG | 40°57′27.0″ N | 71°15′07.6″ W
AW03 | WTG | 40°57′28.4″ N | 71°13′48.4″ W
AW05 | WTG | 40°57′31.7″ N | 71°11′10.0″ W
AW06 | WTG | 40°57′31.7″ N | 71°09′50.8″ W
AW07 | WTG | 40°57′34.6″ N | 71°08′31.6″ W
AW08 | WTG | 40°57′33.8″ N | 71°07′12.4″ W
AW09 | WTG | 40°57′37.4″ N | 71°05′53.5″ W
AW10 | WTG | 40°57′38.9″ N | 71°04′34.3″ W
AW11 | WTG | 40°57′40.3″ N | 71°03′15.1″ W
AW12 | WTG | 40°57′38.9″ N | 71°01′55.9″ W
AU03 | WTG | 40°59′28.3″ N | 71°13′57.4″ W
AU08 | OCS-DC | 40°59′36.2″ N | 71°07′17.0″ W
(b) Definitions. As used in this section:
Designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer designated by or assisting the USCG Northeast District Commander in the enforcement of the safety zones.
Local officer means any officer, agent, or employee of a unit of local government authorized by law or by a local government agency to engage in or supervise the prevention, detection, investigation, or prosecution of any violation of criminal law.
(c) Regulations. No vessel may enter or remain in the safety zone described in paragraph (a) of this section except for the following:
(1) An attending vessel as defined in 33 CFR 147.20;
(2) A vessel authorized by the USCG Northeast District Commander or a designated representative.
(d) Request for permission. Persons or vessels seeking to enter the safety zone must request authorization from the USCG Northeast District Commander or a designated representative. If permission is granted, all persons and vessels must comply with lawful instructions of the USCG Northeast District Commander or designated representative via VHF-FM channel 16 or by phone at 866-842-1560 (USCG Northeast District Command Center).
(e) Effective and enforcement periods. This rule will be effective from 12:01 a.m. June 1, 2025, through 11:59 p.m. on May 31, 2028. But individual safety zones will only be enforced during active construction or other instances which may cause a hazard to navigation as determined by the USCG Northeast District Commander. The USCG Northeast District Commander will make notification of the exact dates and times in advance of each enforcement period for the safety zones in paragraph (a) of this section to the local maritime community through the Local Notice to Mariners and will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. If the project is completed before May 31, 2028, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The USCG Northeast District Local Notice to Mariners can be found at: http://www.navcen.uscg.gov.
(f) Processing of violations. Violations of this section may be processed in accordance with 33 CFR 140.40 on civil and criminal penalty proceedings.
[USCG-2025-0056, 90 FR 25154, June 16, 2025]
Effective Date Note:By USCG-2025-0056, 90 FR 25154, June 16, 2025, § 147.T01-0056 was added, effective June 16, 2025, through May 31, 2028.
§ 147.T01-0134 Safety Zone; Revolution Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0486, Offshore Rhode Island, Atlantic Ocean.
(a) Description. The area within 500-meters of the center point of the positions provided in table 1 is a safety zone:
Table 1 to Paragraph (a)
Name | Facility type | Latitude | Longitude
AE06 | WTG | 41°13.555′ N | 71°10.367′ W
AE07 | WTG | 41°13.575′ N | 71°09.050′ W
AE08 | WTG | 41°13.603′ N | 71°07.719′ W
AE09 | WTG | 41°13.632′ N | 71°06.402′ W
AE10 | WTG | 41°13.652′ N | 71°05.081′ W
AE11 | WTG | 41°13.676′ N | 71°03.763′ W
AF05 | WTG | 41°12.528′ N | 71°11.647′ W
AF06 | WTG | 41°12.554′ N | 71°10.336′ W
AF08 | OSS | 41°12.607′ N | 71°07.702′ W
AF09 | WTG | 41°12.628′ N | 71°06.375′ W
AF10 | WTG | 41°12.652′ N | 71°05.051′ W
AF11 | WTG | 41°12.676′ N | 71°03.738′ W
AG04 | WTG | 41°11.504′ N | 71°12.944′ W
AG05 | WTG | 41°11.529′ N | 71°11.625′ W
AG06 | WTG | 41°11.554′ N | 71°10.302′ W
AG07 | WTG | 41°11.579′ N | 71°08.984′ W
AG08 | WTG | 41°11.606′ N | 71°07.660′ W
AG09 | WTG | 41°11.625′ N | 71°06.359′ W
AH04 | WTG | 41°10.503′ N | 71°12.921′ W
AH05 | WTG | 41°10.529′ N | 71°11.594′ W
AH06 | WTG | 41°10.548′ N | 71°10.276′ W
AH07 | WTG | 41°10.586′ N | 71°08.946′ W
AH08 | WTG | 41°10.610′ N | 71°07.622′ W
AH09 | WTG | 41°10.632′ N | 71°06.307′ W
AJ02 | WTG | 41°09.452′ N | 71°15.530′ W
AJ03 | WTG | 41°09.470′ N | 71°14.213′ W
AJ04 | WTG | 41°09.502′ N | 71°12.896′ W
AJ05 | WTG | 41°09.528′ N | 71°11.478′ W
AJ06 | WTG | 41°09.563′ N | 71°10.243′ W
AJ07 | WTG | 41°09.578′ N | 71°08.919′ W
AJ08 | WTG | 41°09.604′ N | 71°07.612′ W
AJ09 | WTG | 41°09.633′ N | 71°06.319′ W
AJ10 | WTG | 41°09.638′ N | 71°04.949′ W
AJ11 | OSS | 41°09.675′ N | 71°03.617′ W
AJ12 | WTG | 41°09.695′ N | 71°02.297′ W
AJ13 | WTG | 41°09.737′ N | 71°00.954′ W
AJ14 | WTG | 41°09.748′ N | 70°59.654′ W
AJ15 | WTG | 41°09.757′ N | 70°58.367′ W
AK10 | WTG | 41°08.654′ N | 71°04.935′ W
AK12 | WTG | 41°08.699′ N | 71°02.260′ W
AL10 | WTG | 41°07.652′ N | 71°04.840′ W
AL11 | WTG | 41°07.666′ N | 71°03.554′ W
AL12 | WTG | 41°07.652′ N | 71°02.224′ W
AL18 | WTG | 41°07.834′ N | 70°54.300′ W
AL19 | WTG | 41°07.856′ N | 70°52.968′ W
AL20 | WTG | 41°07.876′ N | 70°51.651′ W
AL21 | WTG | 41°07.887′ N | 70°50.387′ W
AM11 | WTG | 41°06.666′ N | 71°03.547′ W
AM12 | WTG | 41°06.680′ N | 71°02.252′ W
AM14 | WTG | 41°06.705′ N | 70°59.567′ W
AM17 | WTG | 41°06.796′ N | 70°55.614′ W
AM18 | WTG | 41°06.833′ N | 70°54.272′ W
AM19 | WTG | 41°06.862′ N | 70°52.937′ W
AM20 | WTG | 41°06.877′ N | 70°51.626′ W
AM21 | WTG | 41°06.904′ N | 70°50.325′ W
AN11 | WTG | 41°05.666′ N | 71°03.499′ W
AN12 | WTG | 41°05.703′ N | 71°02.118′ W
AN13 | WTG | 41°05.675′ N | 71°00.836′ W
AN14 | WTG | 41°05.801′ N | 70°59.538′ W
AN15 | WTG | 41°05.760′ N | 70°58.223′ W
AN16 | WTG | 41°05.792′ N | 70°56.911′ W
AP11 | WTG | 41°04.671′ N | 71°03.482′ W
AP12 | WTG | 41°04.697′ N | 71°02.144′ W
AP13 | WTG | 41°04.731′ N | 71°00.873′ W
AP14 | WTG | 41°04.746′ N | 70°59.423′ W
AP15 | WTG | 41°04.766′ N | 70°58.180′ W
AP16 | WTG | 41°04.788′ N | 70°56.858′ W
(b) Definitions. As used in this section, designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer designated by or assisting the USCG Northeast District Commander in the enforcement of the safety zones. Local officer means any officer, agent, or employee of a unit of local government authorized by law or by a local government agency to engage in or supervise the prevention, detection, investigation, or prosecution of any violation of criminal law.
(c) Regulations. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel as defined in 33 CFR 147.20;
(2) A vessel authorized by the USCG Northeast District Commander or a designated representative.
(d) Request for Permission. Persons or vessels seeking to enter the safety zone must request authorization from the USCG Northeast District Commander or a designated representative. If permission is granted, all persons and vessels must comply with lawful instructions of the USCG Northeast District Commander or designated representative via VHF-FM channel 16 or by phone at 866-842-1560 (USCG Northeast District Command Center).
(e) Effective and enforcement periods. This section will be effective from June 1, 2024, through 11:59 p.m. on May 31, 2027. But it will only be enforced during active construction or other instances which may cause a hazard to navigation deemed necessary by the USCG Northeast District Commander. The USCG Northeast District Commander will make notification of the exact dates and times in advance of each enforcement period for the locations above in paragraph (a) of this section to the local maritime community through the Local Notice to Mariners and will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. If the project is completed before May 31, 2027, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The USCG Northeast District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov.
[USCG-2024-0134, 89 FR 42801, May 16, 2024]
Effective Date Note:By USCG-2024-0134, 89 FR 42801, May 16, 2024, § 147.T01-0134 was added, effective June 1, 2024, through May 31, 2027.
§ 147.T01-0704 Safety Zone; Empire Wind 1 Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0512, Offshore New York and New Jersey, Atlantic Ocean.
(a) Description. The area within 500-meters of the center point of the positions provided in the table below expressed in Degrees (°) Minutes (′) Seconds (″) (DMS) based on North American Datum 1983 (NAD 83).
Table 1 to Paragraph (a)
Name | Facility type | Latitude | Longitude
B01 | WTG | 40°22′25.878″ N | 73°33′41.509″ W
C01 | WTG | 40°21′35.382″ N | 73°33′42.583″ W
B02 | WTG | 40°22′15.912″ N | 73°32′49.958″ W
D02 | WTG | 40°21′12.870″ N | 73°32′51.312″ W
B03 | WTG | 40°22′05.938″ N | 73°31′58.412″ W
D03 | WTG | 40°20′50.352″ N | 73°32′00.051″ W
B04 | WTG | 40°21′55.959″ N | 73°31′06.870″ W
D04 | WTG | 40°20′27.828″ N | 73°31′08.799″ W
B05 | WTG | 40°21′45.973″ N | 73°30′15.333″ W
D05 | WTG | 40°20′05.299″ N | 73°30′17.557″ W
B06 | WTG | 40°21′35.981″ N | 73°29′23.800″ W
E06 | WTG | 40°19′42.762″ N | 73°29′26.325″ W
B07 | WTG | 40°21′25.983″ N | 73°28′32.271″ W
E07 | WTG | 40°19′20.220″ N | 73°28′35.102″ W
B08 | WTG | 40°21′15.978″ N | 73°27′40.747″ W
E08 | WTG | 40°18′57.671″ N | 73°27′43.888″ W
B09 | WTG | 40°21′05.967″ N | 73°26′49.227″ W
C09 | OSS | 40°20′25.307″ N | 73°26′50.160″ W
F09 | WTG | 40°18′35.116″ N | 73°26′52.685″ W
B10 | WTG | 40°20′55.950″ N | 73°25′57.712″ W
C10 | WTG | 40°20′15.2898″ N | 73°25′58.653″ W
D10 | WTG | 40°19′34.629″ N | 73°25′59.594″ W
E10 | WTG | 40°18′53.969″ N | 73°26′00.534″ W
B11 | WTG | 40°20′45.926″ N | 73°25′06.201″ W
C11 | WTG | 40°20′05.266″ N | 73°25′07.150″ W
D11 | WTG | 40°19′24.606″ N | 73°25′08.100″ W
E11 | WTG | 40°18′43.946″ N | 73°25′09.048″ W
F11 | WTG | 40°17′49.988″ N | 73°25′10.306″ W
B12 | WTG | 40°20′35.896″ N | 73°24′14.694″ W
C12 | WTG | 40°19′55.236″ N | 73°24′15.652″ W
B13 | WTG | 40°20′25.860″ N | 73°23′23.192″ W
C13 | WTG | 40°19′45.200″ N | 73°23′24.159″ W
B14 | WTG | 40°20′15.817″ N | 73°22′31.694″ W
D14 | WTG | 40°18′54.499″ N | 73°22′33.644″ W
C15 | WTG | 40°19′25.110″ N | 73°21′41.185″ W
H15 | WTG | 40°16′19.659″ N | 73°21′45.664″ W
B16 | WTG | 40°19′55.714″ N | 73°20′48.712″ W
G16 | WTG | 40°16′32.420″ N | 73°20′53.667″ W
H16 | WTG | 40°15′57.881″ N | 73°20′54.528″ W
B17 | WTG | 40°19′45.652″ N | 73°19′57.228″ W
D17 | WTG | 40°18′24.335″ N | 73°19′59.229″ W
F17 | WTG | 40°17′03.018″ N | 73°20′01.227″ W
C18 | WTG | 40°18′54.926″ N | 73°19′06.757″ W
D18 | WTG | 40°18′14.268″ N | 73°19′07.766″ W
E18 | WTG | 40°17′33.610″ N | 73°19′08.774″ W
F18 | WTG | 40°16′52.952″ N | 73°19′09.781″ W
B19 | WTG | 40°19′25.511″ N | 73°18′14.273″ W
C19 | WTG | 40°18′44.853″ N | 73°18′15.290″ W
D19 | WTG | 40°18′04.195″ N | 73°18′16.307″ W
E19 | WTG | 40°17′23.537″ N | 73°18′17.324″ W
B20 | WTG | 40°19′15.431″ N | 73°17′22.802″ W
C20 | WTG | 40°18′34.773″ N | 73°17′23.828″ W
D20 | WTG | 40°17′54.115″ N | 73°17′24.853″ W
B21 | WTG | 40°19′05.344″ N | 73°16′31.335″ W
C21 | WTG | 40°18′24.687″ N | 73°16′32.370″ W
(b) Definitions. As used in this section:
(1) Designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer designated by or assisting the USCG Northeast District Commander in the enforcement of the safety zones.
(2) Local officer means any officer, agent, or employee of a unit of local government authorized by law or by a local government agency to engage in or supervise the prevention, detection, investigation, or prosecution of any violation of criminal law.
(c) Regulations. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel as defined in 33 CFR 147.20;
(2) A vessel authorized by the USCG Northeast District Commander or a designated representative.
(d) Request for permission. Persons or vessels seeking to enter the safety zone must request authorization from the USCG Northeast District Commander or a designated representative. If permission is granted, all persons and vessels must comply with lawful instructions of the USCG Northeast District Commander or designated representative via VHF-FM channel 16 or by phone at 866-842-1560 (USCG Northeast District Command Center).
(e) Effective and enforcement periods. This section will be effective from 12:01 a.m. on March 10, 2025, through 11:59 p.m. on February 29, 2028. But it will only be enforced during active construction or other instances which may cause a hazard to navigation deemed necessary by the USCG Northeast District Commander. The USCG Northeast District Commander will make notification of the exact dates and times in advance of each enforcement period for the safety zones in paragraph (a) of this section to the local maritime community through the Local Notice to Mariners and will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. If the project is completed before February 29, 2028, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The USCG Northeast District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov/msi.
(f) Processing of violations. Violations of this section may be processed in accordance with 33 CFR 140.40 on civil and criminal penalty proceedings.
[USCG-2024-0704, 90 FR 15408, Apr. 11, 2025]
Effective Date Note:By USCG-2024-0704, 90 FR 15408, Apr. 11, 2025, § 147.T01-0704 was added, effective Apr. 11, 2025, through Feb. 29, 2028.
§ 147.T01-0985 Safety Zones; Coastal Virginial Offshore Wind—Commercial Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0483, Offshore Virginia, Atlantic Ocean.
(a) Description. The area within 500 meters of the center point of each of the positions provided in the table below is an individual safety zone:
Name | Facility type | Latitude | Longitude
G1K11 | WTG | 36°52′10.43097128″ N | 075°20′50.55112518″ W
G1M03 | WTG | 36°50′17.85976540″ N | 075°28′04.02927152″ W
G1K12 | WTG | 36°52′10.59092864″ N | 075°19′54.56958689″ W
G1M04 | WTG | 36°50′18.07627889″ N | 075°27′08.07134847″ W
G1K13 | WTG | 36°52′10.74355846″ N | 075°18′58.58792867″ W
G1M05 | WTG | 36°50′18.28547996″ N | 075°26′12.11326220″ W
G1K14 | WTG | 36°52′10.88886719″ N | 075°18′02.60615617″ W
G1M06 | WTG | 36°50′18.48736529″ N | 075°25′16.15501832″ W
G1K15 | WTG | 36°52′11.02685154″ N | 075°17′06.62427499″ W
G1M07 | WTG | 36°50′18.68193157″ N | 075°24′20.19662240″ W
G1K16 | WTG | 36°52′11.15750822″ N | 075°16′10.64229074″ W
G1M08 | WTG | 36°50′18.86918522″ N | 075°23′24.23808009″ W
G1K17 | WTG | 36°52′11.28084368″ N | 075°15′14.66020907″ W
G1M09 | WTG | 36°50′19.04912296″ N | 075°22′28.27939699″ W
G1K18 | WTG | 36°52′11.39685463″ N | 075°14′18.67803558″ W
G1M10 | WTG | 36°50′19.22174146″ N | 075°21′32.32057869″ W
G1K19 | WTG | 36°52′11.50553780″ N | 075°13′22.69577588″ W
G1M11 | WTG | 36°50′19.38704718″ N | 075°20′36.36163083″ W
G1L03 | WTG | 36°51′13.39015630″ N | 075°28′11.19226080″ W
G1M12 | WTG | 36°50′19.54503681″ N | 075°19′40.40255901″ W
G1L04 | WTG | 36°51′13.60768637″ N | 075°27′15.22311182″ W
G1M13 | WTG | 36°50′19.69570706″ N | 075°18′44.44336883″ W
G1L05 | WTG | 36°51′13.81789345″ N | 075°26′19.25379877″ W
G1M14 | WTG | 36°50′19.83906437″ N | 075°17′48.48406591″ W
G1L06 | WTG | 36°51′14.02078396″ N | 075°25′23.28432730″ W
G1M15 | WTG | 36°50′19.97510546″ N | 075°16′52.52465182″ W
G1L07 | WTG | 36°51′14.21635459″ N | 075°24′27.31470302″ W
G1M16 | WTG | 36°50′20.10382703″ N | 075°15′56.56514024″ W
G1L08 | WTG | 36°51′14.40460203″ N | 075°23′31.34493152″ W
G1M17 | WTG | 36°50′20.22523552″ N | 075°15′00.60553275″ W
G1L09 | WTG | 36°51′14.58553272″ N | 075°22′35.37501844″ W
G1M18 | WTG | 36°50′20.33932767″ N | 075°14′04.64583497″ W
G1L10 | WTG | 36°51′14.75914336″ N | 075°21′39.40496939″ W
G1M19 | WTG | 36°50′20.44610343″ N | 075°13′08.68605250″ W
G1L12 | WTG | 36°51′15.08440100″ N | 075°19′47.46448580″ W
G1N03 | WTG | 36°49′22.32924535″ N | 075°27′56.82891331″ W
G1L13 | WTG | 36°51′15.23605115″ N | 075°18′51.49406251″ W
G1N04 | WTG | 36°49′22.54474453″ N | 075°27′00.88220767″ W
G1L14 | WTG | 36°51′15.38038104″ N | 075°17′55.52352570″ W
G1N05 | WTG | 36°49′22.75293211″ N | 075°26′04.93533961″ W
G1L15 | WTG | 36°51′15.51738738″ N | 075°16′59.55288098″ W
G1N06 | WTG | 36°49′22.95380477″ N | 075°25′08.98831473″ W
G1L16 | WTG | 36°51′15.64707661″ N | 075°16′03.58213399″ W
G1N07 | WTG | 36°49′23.14736895″ N | 075°24′13.04113865″ W
G1L17 | WTG | 36°51′15.76944545″ N | 075°15′07.61129032″ W
G1N08 | WTG | 36°49′23.33362134″ N | 075°23′17.09381697″ W
G1L18 | WTG | 36°51′15.88449062″ N | 075°14′11.64035558″ W
G1N09 | WTG | 36°49′23.51255863″ N | 075°22′21.14635529″ W
G1L19 | WTG | 36°51′15.99221858″ N | 075°13′15.66933541″ W
G1N10 | WTG | 36°49′23.68418726″ N | 075°21′25.19875519″ W
G1N11 | WTG | 36°49′23.84850393″ N | 075°20′29.25103034″ W
G2F06 | WTG | 36°55′51.61831765″ N | 075°25′59.09646230″ W
G1N12 | WTG | 36°49′24.00550534″ N | 075°19′33.30318231″ W
G2F07 | WTG | 36°55′51.81892515″ N | 075°25′03.07058271″ W
G1N13 | WTG | 36°49′24.15519793″ N | 075°18′37.35521671″ W
G2F08 | WTG | 36°55′52.01218908″ N | 075°24′07.04455187″ W
G1N14 | WTG | 36°49′24.29757841″ N | 075°17′41.40713915″ W
G2F09 | WTG | 36°55′52.19811586″ N | 075°23′11.01837544″ W
G1N15 | WTG | 36°49′24.43264349″ N | 075°16′45.45895522″ W
G2F10 | WTG | 36°55′52.37670219″ N | 075°22′14.99205905″ W
G1N16 | WTG | 36°49′24.56039962″ N | 075°15′49.51067054″ W
G2F11 | WTG | 36°55′52.54794477″ N | 075°21′18.96560832″ W
G1N17 | WTG | 36°49′24.68084352″ N | 075°14′53.56229072″ W
G2G03 | WTG | 36°54′55.47610540″ N | 075°28′39.95488075″ W
G1N18 | WTG | 36°49′24.79397189″ N | 075°13′57.61382134″ W
G2G04 | WTG | 36°54′55.69770649″ N | 075°27′43.94075021″ W
G1N19 | WTG | 36°49′24.89979121″ N | 075°13′01.66526804″ W
G2G05 | WTG | 36°54′55.91197477″ N | 075°26′47.92645237″ W
G2B06 | WTG | 36°59′33.71078023″ N | 075°26′27.78408472″ W
G2G06 | WTG | 36°54′56.11890692″ N | 075°25′51.91199284″ W
G2B07 | WTG | 36°59′33.91543395″ N | 075°25′31.71304424″ W
G2G08 | WTG | 36°54′56.51075936″ N | 075°23′59.88261121″ W
G2C05 | WTG | 36°58′38.57467997″ N | 075°27′20.62031850″ W
G2G09 | WTG | 36°54′56.69568276″ N | 075°23′03.86770040″ W
G2C06 | WTG | 36°58′38.21250366″ N | 075°26′20.58758650″ W
G2G10 | WTG | 36°54′56.87326655″ N | 075°22′07.85265041″ W
G2C07 | WTG | 36°58′38.41606238″ N | 075°25′24.55006971″ W
G2H03 | WTG | 36°53′59.94685093″ N | 075°28′32.77985639″ W
G2D04 | WTG | 36°57′42.25404052″ N | 075°28′05.53076883″ W
G2H04 | WTG | 36°54′00.16743776″ N | 075°27′36.77698565″ W
G2D05 | WTG | 36°57′42.47136588″ N | 075°27′09.48264513″ W
G2H05 | WTG | 36°54′00.38069261″ N | 075°26′40.77394842″ W
G2D06 | WTG | 36°57′42.68134287″ N | 075°26′13.43435729″ W
G2H06 | WTG | 36°54′00.58661217″ N | 075°25′44.77075028″ W
G2D07 | WTG | 36°57′42.88396818″ N | 075°25′17.38591093″ W
G2H07 | WTG | 36°54′00.78520287″ N | 075°24′48.76739692″ W
G2D08 | WTG | 36°57′43.07924823″ N | 075°24′21.33731172″ W
G2H08 | WTG | 36°54′00.97646139″ N | 075°23′52.76389394″ W
G2D09 | WTG | 36°57′43.26717972″ N | 075°23′25.28856531″ W
G2H09 | WTG | 36°54′01.16038445″ N | 075°22′56.76024694″ W
G2D10 | WTG | 36°57′43.44775934″ N | 075°22′29.23967731″ W
G2J03 | WTG | 36°53′04.41747586″ N | 075°28′25.56744405″ W
G2D11 | WTG | 36°57′43.62099353″ N | 075°21′33.19065340″ W
G2J04 | WTG | 36°53′04.63703769″ N | 075°27′29.57582449″ W
G2E03 | WTG | 36°56′46.50113710″ N | 075°28′54.35420276″ W
G2J05 | WTG | 36°53′04.84927487″ N | 075°26′33.58403927″ W
G2E04 | WTG | 36°56′46.72478481″ N | 075°27′58.31753397″ W
G2J06 | WTG | 36°53′05.05418408″ N | 075°25′37.59209399″ W
G2E05 | WTG | 36°56′46.94108831″ N | 075°27′02.28069620″ W
G2J07 | WTG | 36°53′05.25176202″ N | 075°24′41.59999425″ W
G2E06 | WTG | 36°56′47.15004427″ N | 075°26′06.24369509″ W
G2J09 | WTG | 36°53′05.62494006″ N | 075°22′49.61534996″ W
G2E07 | WTG | 36°56′47.35165913″ N | 075°25′10.20653631″ W
G2K03 | WTG | 36°52′08.88765106″ N | 075°28′18.39844436″ W
G2E08 | WTG | 36°56′47.54592958″ N | 075°24′14.16922549″ W
G2K04 | WTG | 36°52′09.10620073″ N | 075°27′22.41806364″ W
G2E09 | WTG | 36°56′47.73285231″ N | 075°23′18.13176420″ W
G2K05 | WTG | 36°52′09.31742657″ N | 075°26′26.43752208″ W
G2E10 | WTG | 36°56′47.91243374″ N | 075°22′22.09416621″ W
G2K06 | WTG | 36°52′09.52132527″ N | 075°25′30.45682126″ W
G2E11 | WTG | 36°56′48.08467058″ N | 075°21′26.05643310″ W
G2K07 | WTG | 36°52′09.71790326″ N | 075°24′34.47596683″ W
G2F03 | WTG | 36°55′50.97245702″ N | 075°28′47.17314135″ W
G2K08 | WTG | 36°52′09.90715725″ N | 075°23′38.49496439″ W
G2F04 | WTG | 36°55′51.19508514″ N | 075°27′51.14774524″ W
G2K09 | WTG | 36°52′10.08908391″ N | 075°22′42.51381954″ W
G2F05 | WTG | 36°55′51.41036987″ N | 075°26′55.12218502″ W
G2K10 | WTG | 36°52′10.26368969″ N | 075°21′46.53253794″ W
G3F14 | WTG | 36°55′53.01763543″ N | 075°18′30.88550656″ W
G3B12 | WTG | 36°59′34.82834796″ N | 075°20′51.35563765″ W
G3F15 | WTG | 36°55′53.15951871″ N | 075°17′34.85857490″ W
G3B13 | WTG | 36°59′34.98885750″ N | 075°19′55.28375508″ W
G3F16 | WTG | 36°55′53.29406124″ N | 075°16′38.83153710″ W
G3F17 | WTG | 36°55′53.42125972″ N | 075°15′42.80439879″ W
G3F18 | WTG | 36°55′53.54112062″ N | 075°14′46.77716562″ W
G3B14 | WTG | 36°59′35.14201327″ N | 075°18′59.21175196″ W
G3F19 | WTG | 36°55′53.65364064″ N | 075°13′50.74984322″ W
G3B15 | WTG | 36°59′35.28781198″ N | 075°18′03.13963394″ W
G3G11 | WTG | 36°54′57.04351716″ N | 075°21′11.83746691″ W
G3B16 | WTG | 36°59′35.42625034″ N | 075°17′07.06740666″ W
G3G12 | WTG | 36°54′57.20643128″ N | 075°20′15.82215551″ W
G3B17 | WTG | 36°59′35.55733479″ N | 075°16′10.99507580″ W
G3G13 | WTG | 36°54′57.36200563″ N | 075°19′19.80672183″ W
G3B18 | WTG | 36°59′35.68106205″ N | 075°15′14.92264701″ W
G3G14 | WTG | 36°54′57.51024665″ N | 075°18′23.79117153″ W
G3C12 | WTG | 36°58′39.32403511″ N | 075°20′44.22693929″ W
G3G16 | WTG | 36°54′57.78471551″ N | 075°16′31.75974356″ W
G3C13 | WTG | 36°58′39.48355669″ N | 075°19′48.16635951″ W
G3G17 | WTG | 36°54′57.91094652″ N | 075°15′35.74387716″ W
G3C14 | WTG | 36°58′39.63572535″ N | 075°18′52.10565996″ W
G3G18 | WTG | 36°54′58.02984078″ N | 075°14′39.72791666″ W
G3C16 | WTG | 36°58′39.91800046″ N | 075°16′59.98392414″ W
G3G19 | WTG | 36°54′58.14139499″ N | 075°13′43.71186768″ W
G3C17 | WTG | 36°58′40.04811007″ N | 075°16′03.92289920″ W
G3H12 | WTG | 36°54′01.66816614″ N | 075°20′08.74849831″ W
G3C18 | WTG | 36°58′40.17086334″ N | 075°15′07.86177303″ W
G3H13 | WTG | 36°54′01.82276296″ N | 075°19′12.74433164″ W
G3C19 | WTG | 36°58′40.28626670″ N | 075°14′11.80055940″ W
G3H14 | WTG | 36°54′01.97002729″ N | 075°18′16.74004507″ W
G3C20 | WTG | 36°58′40.39431689″ N | 075°13′15.73925991″ W
G3H16 | WTG | 36°54′02.24255501″ N | 075°16′24.73115496″ W
G3D12 | WTG | 36°57′43.78687899″ N | 075°20′37.14149923″ W
G3H17 | WTG | 36°54′02.36782157″ N | 075°15′28.72655864″ W
G3D13 | WTG | 36°57′43.94541242″ N | 075°19′41.09222040″ W
G3H19 | WTG | 36°54′02.59635341″ N | 075°13′36.71709160″ W
G3D14 | WTG | 36°57′44.09660027″ N | 075°18′45.04281857″ W
G3J12 | WTG | 36°53′06.12974216″ N | 075°20′01.63737188″ W
G3D16 | WTG | 36°57′44.37692600″ N | 075°16′52.94368860″ W
G3J13 | WTG | 36°53′06.28335394″ N | 075°19′05.64446363″ W
G3D17 | WTG | 36°57′44.50606705″ N | 075°15′56.89396774″ W
G3J15 | WTG | 36°53′06.56858897″ N | 075°17′13.65830753″ W
G3D18 | WTG | 36°57′44.62785910″ N | 075°15′00.84415047″ W
G3J16 | WTG | 36°53′06.70021537″ N | 075°16′17.66507094″ W
G3D19 | WTG | 36°57′44.74230209″ N | 075°14′04.79424245″ W
G3J17 | WTG | 36°53′06.82450998″ N | 075°15′21.67173614″ W
G3D20 | WTG | 36°57′44.84939275″ N | 075°13′08.74424932″ W
G3J18 | WTG | 36°53′06.94147924″ N | 075°14′25.67830877″ W
G3E13 | WTG | 36°56′48.40710702″ N | 075°19′33.98058407″ W
G3J19 | WTG | 36°53′07.05111989″ N | 075°13′29.68479445″ W
G3E14 | WTG | 36°56′48.55730976″ N | 075°18′37.94247944″ W
T1L11 | OSS | 36°51′14.92543064″ N | 075°20′43.43478996″ W
G3E15 | WTG | 36°56′48.70016447″ N | 075°17′41.90426225″ W
T2G07 | OSS | 36°54′56.31849964″ N | 075°24′55.89737723″ W
G3E16 | WTG | 36°56′48.83567758″ N | 075°16′45.86593816″ W
T3G15 | OSS | 36°54′57.65115104″ N | 075°17′27.77551023″ W
G3E17 | WTG | 36°56′48.96384581″ N | 075°15′49.82751279″ W
G3E18 | WTG | 36°56′49.08466587″ N | 075°14′53.78899178″ W
G3F12 | WTG | 36°55′52.71185004″ N | 075°20′22.93902891″ W
G3F13 | WTG | 36°55′52.86841469″ N | 075°19′26.91232645″ W
(b) Definitions. As used in this section, designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer designated by or assisting the USCG East District Commander in the enforcement of the safety zones.
(c) Regulations. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel, as defined in 33 CFR 147.20;
(2) A vessel authorized by the USCG East District Commander or a designated representative.
(d) Request for Permission. Persons or vessels seeking to enter the safety zone must request authorization from the USCG East District Commander or a designated representative. If permission is granted, all persons and vessels must comply with lawful instructions of the USCG East District Commander or designated representative via VHF-FM channel 16 or by phone at 757-398-6391 (USCG East District Command Center).
(e) Effective dates and enforcement periods. This section will be in effect from May 1, 2024, through May 1, 2027. Individual safety zones designated in the table in subparagraph (a) will only be subject to enforcement, however, during active construction or other circumstances which may create a hazard to navigation as determined by the USCG East District Commander. The USCG East District Commander will provide notification of the exact dates and times each safety zone is subject to enforcement in advance of each enforcement period for each of the locations listed above, in paragraph (a) of this section. Notifications will be made to the local maritime community through the Local Notice to Mariners and the Coast Guard will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. If the entire project is completed before May 1, 2027, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The USCG East District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov.
[USCG-2023-0985, 89 FR 20854, Mar. 26, 2024]
Effective Date Note:By USCG-2023-0985, 89 FR 20854, Mar. 26, 2024, § 147.T01-0985 was added, effective May 1, 2024, through May 1, 2027.
§ 147.5 Delegation of authority.
The authority to establish safety zones and to issue and enforce safety zone regulations in accordance with the provisions of this part is delegated to District Commanders.
§ 147.10 Establishment of safety zones.
(a) Whenever it comes to the attention of the District Commander that a safety zone and regulations may be required concerning any OCS facility being constructed, maintained, or operated on the Outer Continental Shelf or its appurtenances and attending vessels, or the adjacent waters, the District Commander may initiate appropriate inquiry to determine whether a safety zone and regulations should be established. In making this determination, the District Commander considers all relevant safety factors, including existing or reasonably foreseeable congestion of vessels, the presence of unusually harmful or hazardous substances, and any obstructions within 500 meters of the OCS facility. If the District Commander determines that the circumstances warrant the establishment of a safety zone and regulations the District Commander takes action as necessary consistent with the provisions of this part.
(b) For purposes of establishing safety zones under this part, OCS facility includes non-mineral energy resource permanent or temporary structures.
(c) Except as provided in paragraph (d) of this section, a safety zone and necessary regulations may be established concerning any OCS facility being constructed, maintained or operated on the Outer Continental Shelf, following publication of a notice of proposed rule making in the Federal Register and after interested parties have been given the opportunity to submit comments. A zone and necessary regulations may be in effect during any period when construction equipment and materials are within 500 meters of the construction site until the removal of all portions of the facility.
(d) A safety zone and necessary regulations may be established without public rule making procedures when the District Commander determined that imminent danger exists with respect to the safety of life and property on an OCS facility constructed, maintained, or operated on the Outer Continental Shelf, its appurtenances and attending vessels or adjacent waters. A safety zone and regulations may be made effective on the date the rule is published in the Federal Register. However, if circumstances require, they may be placed into effect immediately, followed promptly by publication in the Federal Register. The District Commander may utilize, in addition to broadcast Notices to Mariners, Local Notices to Mariners, and Notices to Mariners, newspapers, and broadcasting stations to disseminate information concerning a safety zone and regulations pertaining thereto. The public may comment concerning the establishment of a safety zone or regulations under this paragraph. A safety zone or regulations may be modified or withdrawn, as appropriate, based on the comments received.
(e) Geographic coordinates expressed in terms of latitude or longitude, or both, are not intended for plotting on maps or charts whose referenced horizontal datum is the North American Datum of 1983 (NAD 83), unless such geographic coordinates are expressly labeled NAD 83. Geographic coordinates without the NAD 83 reference may be plotted on maps or charts reference to NAD 83 only after application of the appropriate corrections that are published on the particular map or chart being used.
[CGD 78-160, 47 FR 9386, Mar. 4, 1982, as amended by CGD 86-082, 52 FR 33811, Sept. 8, 1987; 88 FR 1513, Jan. 11, 2023]
§ 147.15 Extent of safety zones.
A safety zone establishment under this part may extend to a maximum distance of 500 meters around the OCS facility measured from each point on its outer edge or from its construction site, but may not interfere with the use of recognized sea lanes essential to navigation.
§ 147.20 Definitions.
Unless otherwise stated, the term “attending vessel” refers to any vessel which is operated by the owner or operator of an OCS facility located in the safety zone, which is used for the purpose of carrying supplies, equipment or personnel to or from the facility, which is engaged in construction, maintenance, alteration, or repair of the facility, or which is used for further exploration, production, transfer or storage of natural resources from the seabed beneath the safety zone.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.801 Boxer Platform safety zone.
(a) Description. The Boxer Platform is located at position 27°56′48″ N, 90°59′48″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge, not to extend into the adjacent East—West Gulf of America Fairway is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.803 Bullwinkle Platform safety zone.
(a) Description. The Bullwinkle Platform is located at position 27°53′01″ N, 90°54′04″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.805 Ursa Tension Leg Platform safety zone.
(a) Description. The Ursa Tension Leg Platform (Ursa TLP) is located at position 28°09′14.497″ N, 89°06′12.790″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.807 West Delta 143 Platform safety zone.
(a) Description. The West Delta 143 Platform is located at position 28°39′42″ N, 89°33′05″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge, not to extend into the adjacent Mississippi River Approach Fairway, is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except: (1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.809 Mars Tension Leg Platform safety zone.
(a) Description. The Mars Tension Leg Platform (Mars TLP) is located at position 28°10′10.29″ N, 89°13′22.35″ W with two supply boat mooring buoys at positions 28°10′18.12″ N, 89°12′52.08″ W (Northeast) and 28°09′49.62″ N, 89°12′57.48″ W (Southeast). The area within 500 meters (1640.4 feet) from each point on the structure's outer edge and the area within 500 meters (1640.4 feet) of each of the supply boat mooring buoys is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.811 Ram-Powell Tension Leg Platform safety zone.
(a) Description. The Ram-Powell Tension Leg Platform (Ram-Powell TLP) is located at position 29°03′52.2″ N, 88°05′30″ W with two supply boat mooring buoys at positions 29°03′52.2″ N, 88°05′12.6″ W (Northeast) and 29°03′28.2″ N, 88°05′10.2″ W (Southeast). The area within 500 meters (1640.4 feet) from each point on the structure's outer edge and the area within 500 meters (1640.4 feet) of each of the supply boat mooring buoys is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.813 Auger Tension Leg Platform safety zone.
(a) Description. The Auger Tension Leg Platform (Auger TLP) is located at position 27°32′45.4″ N, 92°26′35.09″ W with two supply boat mooring buoys at positions 27°32′38.1″ N, 92°26′04.8″ W (East Buoy) and 27°32′58.14″ N, 92°27′04.92″ W (West Buoy). The area within 500 meters (1640.4 feet) from each point on the structure's outer edge and an area within 500 meters (1640.4 feet) of each of the supply boat mooring buoys is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except:
(1) an attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing or fishing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD 08-99-023, 65 FR 16825, Mar. 30, 2000]
§ 147.815 ExxonMobil Hoover Floating OCS Facility safety zone.
(a) Description. The ExxonMobil Hoover Floating OCS Facility, Alaminos Canyon Block 25A (AC25A), is located at position 26°56′33″ N, 94°41′19.55″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-01-025, 68 FR 4102, Jan. 28, 2003]
§ 147.817 Sir Douglas Morpeth Tension Leg Platform safety zone.
(a) Description. The Sir Douglas Morpeth Tension Leg Platform (Morpeth TLP), Ewing Bank Block 921A (EW 921A), is located at position 28°02′05.28″ N, 90°01′22.12″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-01-025, 68 FR 4102, Jan. 28, 2003]
§ 147.819 Allegheny Tension Leg Platform safety zone.
(a) Description. The Allegheny Tension Leg Platform (Allegheny TLP), Green Canyon Block 254A (GC 254A), is located at position 27°41′29.65″ N, 90°16′31.93″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-01-025, 68 FR 4102, Jan. 28, 2003]
§ 147.821 Brutus Tension Leg Platform safety zone.
(a) Description. The Brutus Tension Leg Platform (Brutus TLP), Green Canyon Block 158 (GC 158), is located at position 27°47′42.86″ N, 90°38′51.15″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-01-025, 68 FR 4102, Jan. 28, 2003]
§ 147.823 Enchilada Platform safety zone.
(a) Description. The Enchilada Platform, Garden Banks Block 128A (GB 128A), is located at position 27°52′31.31″ N, 91°59′11.09″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge, not to extend into the adjacent East-West Gulf of America Fairway, is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-01-025, 68 FR 4102, Jan. 28, 2003]
§ 147.825 Chevron Genesis Spar safety zone.
(a) Description. The Chevron Genesis Spar, Green Canyon 205A (GC205A), is located at position 27°46′46.365″ N, 90°31′06.553″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-01-043, 68 FR 4100, Jan. 28, 2003]
§ 147.827 Marlin Tension Leg Platform safety zone.
(a) Description. The Marlin Tension Leg Platform (Marlin TLP), Viasca Knoll, Block 915 (VK 915), is located at position 29°6′27.46″ N, 87°56′37.14″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-02-045, 68 FR 55445, Sept. 26, 2003]
§ 147.829 Matterhorn Tension Leg Platform safety zone.
(a) Description. The Matterhorn Tension Leg Platform A (Matterhorn TLP), Mississippi Canyon 243 (MC 243), located at position 28°44′32″ N, 88°39′32″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon [NAD 83].
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-03-017, 68 FR 59118, Oct. 14, 2003]
§ 147.831 Holstein Truss Spar safety zone.
(a) Description. Holstein, Green Canyon 645 (GC 645), located at position 27°19′17″ N, 90°32′08″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon North American Datum 1983.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-03-028, 69 FR 6147, Feb. 10, 2004]
§ 147.833 Na Kika FDS safety zone.
(a) Description. Na Kika FDS, Mississippi Canyon 474 “A” (MC 474 “A”), located at position 28°31′14.86″ N, 88°17′19.69″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon [NAD 83].
(b) Regulation. No vessel may enter or remain in this safety zone except the following: (1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-03-039, 69 FR 21066, Apr. 20, 2004]
§ 147.835 Magnolia TLP safety zone.
(a) Description. Magnolia TLP, Garden Banks 783 “A” (GB 783 “A”), located at position 27°12′13.86″ N, 92°12′09.36″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon [NAD 83].
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-03-040, 69 FR 19934, Apr. 15, 2004]
§ 147.837 Marco Polo Tension Leg Platform safety zone.
(a) Description. Marco Polo Tension Leg Platform, Green Canyon 608 (GC 608), located at position 27°21′43.32″ N, 90°10′53.01″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon [NAD 83].
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-04-004, 69 FR 33858, June 17, 2004]
§ 147.839 Mad Dog Truss Spar Platform safety zone.
(a) Description. The Mad Dog Truss Spar system is in the deepwater area of the Gulf of America at Green Canyon 782. The facility is located at 27°11′18.124″ N., 90°16′7.363″ W. and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[USCG-2015-0512, 80 FR 54721, Sept. 11, 2015]
§ 147.841 Atlantis Semi-Submersible safety zone.
(a) Description. Atlantis Semi-Submersible, Green Canyon 787 (GC 787), located at position 27°11′44″ N, 90°01′37″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon [NAD 83].
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-05-015, 70 FR 43772, July 29, 2005]
§ 147.843 Thunder Horse Semi-Submersible safety zone.
(a) Description. Thunder Horse Semi-Submersible, Mississippi Canyon 778 (MC 778), located at position 28°11′26″ N, 88°29′44″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone. These coordinates are based upon [NAD 83].
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[CGD08-05-019, 70 FR 43770, July 29, 2005]
§ 147.845 Perdido Regional Host safety zone.
(a) Description. The Perdido Regional Host is located at position 26°07′44″ N, 094°53′53″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2008-1051, 74 FR 55138, Oct. 27, 2009]
§ 147.847 Safety Zone; BW PIONEER Floating Production, Storage, and Offloading System Safety Zone.
(a) Description. The BW PIONEER, a Floating Production, Storage and Offloading (FPSO) system, is in the deepwater area of the Gulf of America at Walker Ridge 249. The FPSO can swing in a 360 degree arc around the center point of the turret buoy's swing circle at 26°41′46.25″ N and 090°30′30.16″ W. The area within 500 meters (1640.4 feet) around the stern of the FPSO when it is moored to the turret buoy is a safety zone. If the FPSO detaches from the turret buoy, the area within 500 meters around the center point at 26°41′46.25″ N and 090°30′30.16″ W is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[USCG-2009-0571, 75 FR 19882, Apr. 16, 2010]
§ 147.849 Safety Zone; Olympus Tension Leg Platform.
(a) Description. The Olympus Tension Leg Platform is in the deepwater area of the Gulf of America in Mississippi Canyon Block 807B. The facility is located at 28° 9′35.59″ N, 89°14′20.86″ W. The area within 500 meters (1640.4 feet) from each point on the structure's outer edge and the area within 500 meters (1640.4 feet) of each of the supply boat mooring buoys is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2013-0070, 79 FR 6819, Feb. 5, 2014]
§ 147.851 Jack St. Malo Semi-Sub Facility Safety Zone.
(a) Description. The Jack St. Malo Semi-Sub facility is in the deepwater area of the Gulf of America at Walker Ridge block 718. The facility is located at 26°14′5.94″ N, 91°15′39.99″ W and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2013-0874, 79 FR 52561, Sept. 4, 2014]
§ 147.853 Petronius Compliant Tower Facility Safety Zone.
(a) Description. The Petronius Compliant Tower facility is in the deepwater area of the Gulf of America at Viosca Knoll Block 786. The facility is located at 28°13′44″ N/−87°47′51″ W and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2013-0874, 79 FR 52561, Sept. 4, 2014]
§ 147.855 Blind Faith Semi-Sub Facility Safety Zone.
(a) Description. The Blind Faith Semi-Sub facility is in the deepwater area of the Gulf of America at Mississippi Canyon Block 650. The facility is located at 28°20′29.5279″ N/−88°15′56.4728″ W and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2013-0874, 79 FR 52561, Sept. 4, 2014]
§ 147.857 Tahiti SPAR Facility Safety Zone.
(a) Description. The Tahiti SPAR facility is in the deepwater area of the Gulf of America at Tahiti SPAR. The facility is located at 27°19′33.3″ N/−90°42′50.9″ W and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2013-0874, 79 FR 52561, Sept. 4, 2014]
§ 147.859 Safety Zone; Gulfstar 1 SPAR, Mississippi Canyon Block 724, Outer Continental Shelf on the Gulf of America.
(a) Description. The Gulfstar 1 Spar is in the deepwater area of the Gulf of America at Mississippi Canyon Block 724. The facility is located at 28°14′05.904″ N, 88°59′43.306″ W, and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[USCG-2014-0242, 79 FR 51899, Sept. 2, 2014]
§ 147.861 Interim Big Foot TLP Construction Site safety zone.
(a) Description. The Big Foot Tension Leg Platform (TLP) construction site is in the deepwater area of the Gulf of America at Walker Ridge 29. The Big Foot TLP construction site outermost points are located at:
NW Corner 26-56-18.85 N, 090-31-26.44 W
NE Corner 26-56-18.85 N, 090-30-53.06 W
SE Corner 26-55-46.76 N, 090-30-53.06 W
SW Corner 26-55-46.76 N, 090-31-26.44 W,
and the area within 500 meters of the construction site's outermost points, is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
[80 FR 42388, July 17, 2015]
§ 147.863 Turritella FPSO System Safety Zone.
(a) Description. The Turritella, a Floating Production, Storage and Offloading (FPSO) system is to be installed in the deepwater area of the Gulf of America at Walker Ridge 551. The FPSO can swing in a 360 degree arc around the center point of the turret buoy's swing circle at 26°25′38.74″ N., 90°48′45.34″ W., and the area within 500 meters (1640.4 feet) around the stern of the FPSO when it is moored to the turret buoy is a safety zone. If the FPSO detaches from the turret buoy, the area within 500 meters (1640.4 feet) around the center point at 26°25′38.74″ N., 90°48′45.34″ W. is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[USCG-2015-0318, 80 FR 71942, Nov. 18, 2015]
§ 147.865 Titan SPAR Facility Safety Zone.
(a) Description. The Titan SPAR system is in the deepwater area of the Gulf of America at Mississippi Canyon 941. The facility is located at 28°02′02″ N. 89°06′04″ W. and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District.
[USCG-2015-0320, 80 FR 71944, Nov. 18, 2015]
§ 147.867 Stampede TLP facility safety zone.
(a) Description. The Stampede Tension Leg Platform (TLP) system is in the deepwater area of the Gulf of America at Green Canyon Block 468. The facility is located at 27°30′33.3431″ N. 90°33′22.963″ W. (NAD 83) and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel, as defined by 33 CFR 147.20;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the USCG Heartland District Commander.
[USCG-2017-0110, 82 FR 37177, Aug. 9, 2017]
§ 147.869 Safety Zone; Appomattox FPS Facility, Outer Continental Shelf on the Gulf of America.
(a) Description. The Appomattox Floating Production System (FPS) system is in the deepwater area of the Gulf of America at Mississippi Canyon Block 437. The facility is located at 28°34′25.47″ N 87°56′03.11″ W (NAD 83), and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except the following:
(1) An attending vessel, as defined by 33 CFR 147.20;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the USCG Heartland District Commander or a designated representative.
[USCG-2017-0446, 83 FR 20734, May 8, 2018]
§ 147.871 Safety Zone, Constitution Spar, Outer Continental Shelf Facility, Green Canyon 680, Gulf of America.
(a) Description. The Constitution Spar is in the deepwater area of the Gulf of America at Green Canyon Block 680. The facility is located at 27°17′31.92″ N, 90°58′4.8″ W, (NAD 83) and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in the safety zone described in paragraph (a) of this section except for the following:
(1) An attending vessel, as defined in 147.20
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
(c) Requests for Permission. Persons or vessels requiring authorization to enter the safety zone described in paragraph (a) of this section must request permission from the Commander, USCG Heartland District or a designated representative. If permission is granted, all persons and vessels shall comply with the instructions of the Commander or designated representative.
[88 FR 22914, Apr. 14, 2023]
§ 147.873 Safety Zone; Lucius Spar, Outer Continental Shelf Facility, Keathley Canyon 875.
(a) Description. The Lucius Spar in the deepwater area of the Gulf of America at Keathley Canyon 875. The facility is located at: 26°7′55.0632″ N, 92°2′24.2982″ W (NAD 83) and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel, as defined in 147.20
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
(c) Requests for permission. Persons or vessels requiring authorization to enter the safety zone must request permission from the Commander, USCG Heartland District or a designated representative. If permission is granted, all persons and vessels shall comply with the instructions of the Commander or designated representative.
[USCG-2021-0474, 88 FR 21470, Apr. 11, 2023]
§ 147.875 Safety Zone, Horn Mountain Spar, Outer Continental Shelf Facility, Mississippi Canyon 127.
(a) Description. The Horn Mountain Spar is in the deepwater area of the Gulf of America at Mississippi Canyon 127. The facility is located at: 28°51′57.5994″ N, 88°3′22.32″ W, (NAD 83) and the area within 500 meters (1640.4 feet) from each point on the facililty structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel, as defined in 147.20;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(2) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
(c) Requests for permission. Persons or vessels requiring authorization to enter the safety zone must request permission from the Commander, USCG Heartland District or a designated representative. If permission is granted, all persons and vessels shall comply with the instructions of the Commander or designated representative.
[USCG-2021-0475, 88 FR 21476, Apr. 11, 2023]
§ 147.877 Safety Zone, Heidelberg Spar, Outer Continental Shelf Facility, Green Canyon 860.
(a) Description. The Heidelberg Spar in the deepwater area of the Gulf of America at Green Canyon. The facility is located at: 27°6′41.0394″ N, 90°45′50.3994″ W (NAD 83) and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel, as defined in § 147.20;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
(c) Requests for permission. Persons or vessels requiring authorization to enter the safety zone must request permission from the Commander, USCG Heartland District or a designated representative. If permission is granted, all persons and vessels shall comply with the instructions of the Commander or designated representative.
[USCG-2021-0476, 88 FR 21472, Apr. 11, 2023]
§ 147.879 Safety Zone; Vito Floating Production System, Outer Continental Shelf Facility, Mississippi Canyon Block 939, Gulf of America
(a) Description. The Vito FPS is in the deepwater area of the Gulf of America at Mississippi Canyon Block 939. The facility is located at 28°01′32.325″ N, 89°12′33.254″ W, (NAD 83) and the area within 500 meters (1640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel, as defined in 147.20;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, USCG Heartland District or a designated representative.
(c) Requests for permission. Persons or vessels requiring authorization to enter the safety zone must request permission from the Commander, USCG Heartland District or a designated representative. If permission is granted, all persons and vessels shall comply with the instructions of the Commander or designated representative.
[USCG-2022-0313, 88 FR 21474, Apr. 11, 2023]
§ 147.883 ANCHOR Floating Production Unit safety zone.
(a) Description. The ANCHOR, a Floating Production Unit (FPU), is in the deepwater area of the Gulf of America at Green Canyon 763. The facility is located at: 27°12′23.0394″ N, 91°11′53.1594″ W (NAD 83) and the area within 500 meters (1,640.4 feet) from each point on the facility structure's outer edge is a safety zone.
(b) Regulation. No vessel may enter or remain in this safety zone except for the following:
(1) An attending vessel, as defined in § 147.20;
(2) A vessel under 100 feet in length overall not engaged in towing; or
(3) A vessel authorized by the Commander, Coast Guard Heartland District or a designated representative.
(c) Requests for permission. To seek permission to enter, contact the District Commander or the District Commander's representative on VHF-FM channel 16 or by telephone at (855) 485-3727. All vessels and personnel in the safety zone must comply with all lawful orders or directions given to them by the District Commander or the District Commander's designated representative.
[USCG-2022-0982, 91 FR 53360, Aug. 18, 2026]
§ 147.1102 Platform GRACE safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-10′-47″ N, 119°-28′-05″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1103 Platform GINA safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-07′-02″ N, 119°-16′-35″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1104 Platform ELLEN & ELLY safety zone.
(a) Description: The areas within a line 500 meters from each point on the outer edge of each structure. The structures are approximately 120 meters apart. The position of the center of each structure is: Platform Ellen, 33°-34′-57″ N, 118°-07′-42″ W; and Platform Elly, 33°-35′-00″ N, 118°-07′-40″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel serving either structure, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1105 Platform HONDO safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-23′-27″ N, 120°-07′-14″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except for the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1106 Exxon Santa Ynez offshore storage and treatment vessel mooring safety zone.
(a) Description: The area within a line 1108 meters for the center of the mooring. The position of the center of the mooring is 34°-24′-19″ N 120°-06′00″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1107 Platform GILDA safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-10′-56″ N. 119°-25′-07″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except for the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1108 Platform EDITH safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 33°-35′-45″ N. 118°-08′-27″ W.
(b) Regulations: No vessel may enter or remain in this safety zone except for the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CCGD 11-79-02, 47 FR 39679, Sept. 9, 1982; 48 FR 33263, July 21, 1983]
§ 147.1109 Platform HERMOSA safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34-27-19 N, 120-38-47 W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD 11-84-01, 49 FR 33015, Aug. 20, 1984]
§ 147.1110 Platform HARVEST safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34-28-09.5 N, 120-40-46.1 W.
(b) Regulations: No vessel may enter or remain in this safety zone except for the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD 11-84-01, 49 FR 33016, Aug. 20, 1984]
§ 147.1111 Platform EUREKA safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 33-33-50 N, 118-07-00 W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD 11-84-01, 49 FR 33016, Aug. 20, 1984]
§ 147.1112 Platform HIDALGO safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34-29-42 N, 120-42-08 W.
(b) Regulations: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD 11-84-01, 49 FR 33016, Aug. 20, 1984]
§ 147.1113 Platform GAIL safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-07′-30″ N, 119°-24′-01″ W.
(b) Regulation: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel, (2) a vessel under 100 feet in length overall not engaged in towing, or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD11-87-06, 52 FR 9657, Mar. 26, 1987]
§ 147.1114 Platform HARMONY safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-22′-36″ N, 120°-10′-03″ W.
(b) Regulation: No vessel may enter or remain in this safety zone except the following: (1) an attending vessel; (2) a vessel under 100 feet in length overall not engaged in towing; or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD11-92-01, 57 FR 9055, Mar. 16, 1992]
§ 147.1115 Platform HERITAGE safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-21′-01″ N, 120°-16′-45″ W.
(b) Regulation: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel; (2) a vessel under 100 feet in length overall not engaged in towing; or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD11-92-01, 57 FR 9055, Mar. 16, 1992]
§ 147.1116 Platform IRENE safety zone.
(a) Description: The area within a line 500 meters from each point on the structure's outer edge. The position of the center of the structure is 34°-36′-37.5″ N, 120°-43′-46″ W.
(b) Regulation: No vessel may enter or remain in this safety zone except the following: (1) An attending vessel; (2) a vessel under 100 feet in length overall not engaged in towing; or (3) a vessel authorized by the Commander, USCG Southwest District.
[CGD11-92-02, 57 FR 9054, Mar. 16, 1992]