S Q SUBCHAPTERS Q-R [RESERVED]
SUBCHAPTER S BOATING SAFETY
PART 173 VESSEL NUMBERING AND CASUALTY AND ACCIDENT REPORTING
Authority: 31 U.S.C. 9701; 46 U.S.C. 2110, 6101, 12301, 12302; OMB Circular A-25; DHS Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 72-54R, 37 FR 21399, Oct. 7, 1972, unless otherwise noted.
Subpart A General
§ 173.1 Purpose; preemptive effect.
This part prescribes requirements for numbering vessels and for reporting casualties and accidents to implement sections 6101, 6102, 12301, and 12302 of Title 46, United States Code. The regulations in subparts A, B, and D of this part have preemptive effect over conflicting State or local regulation. The regulations in subpart C of this part have preemptive effect over State or local regulation within the same field, except to the extent that Congress requires the Coast Guard to allow State casualty reporting systems pursuant to 46 U.S.C. chapter 131.
[USCG-2003-14963, 77 FR 18699, Mar. 28, 2012]
§ 173.3 Definitions.
As used in this part—
Airboat means a vessel that is typically flat-bottomed and propelled by an aircraft-type propeller powered by an engine.
Auxiliary sail means a vessel with sail as its primary method of propulsion and mechanical propulsion as its secondary method.
Cabin motorboat means a vessel propelled by propulsion machinery and providing enclosed spaces inside its structure.
Certificate of number means the certificate required by § 173.21 of this part.
Houseboat means a motorized vessel that is usually non-planing and designed primarily for multi-purpose accommodation spaces with low freeboard and little or no foredeck or cockpit.
Hull identification number or HIN means a number required by 33 CFR 181.23.
Inboard, in the context of an engine, means an engine mounted inside the confines of a vessel which powers a drive shaft that turns a water jet impeller or that runs through the bottom of the hull and is attached to a propeller at the other end.
Inflatable boat means a vessel that uses air-filled flexible fabric for buoyancy.
Issuing authority means a State listed in appendix A of this part as having a numbering system approved by the Coast Guard or the Coast Guard itself when a State numbering system has not been approved.
Open motorboat means a vessel equipped with propulsion machinery and having an open load carrying area that does not have a continuous deck to protect it from the entry of water.
Operate means use, navigate, or employ.
Operator means the person who is in control or in charge of a vessel while it is in operation.
Outboard, in the context of an engine, means an engine with propeller or water jet integrally attached, which is usually mounted at the stern of a vessel.
Owner means a person, other than a secured party, having property rights in or title to a vessel, including persons entitled to use or possess a vessel subject to a security interest in another person, but excluding lessees under a lease not intended as security.
Paddlecraft means a vessel powered only by its occupants, using a single or double- bladed paddle as a lever without the aid of a fulcrum provided by oarlocks, thole pins, crutches, or similar arrangements.
Person means an individual, firm, partnership, corporation, company, association, joint-stock association, or governmental entity and includes a trustee, receiver, assignee, or similar representative of any of them.
Personal watercraft means a vessel propelled by a water-jet pump or other machinery as its primary source of motive power and designed to be operated by a person sitting, standing, or kneeling on the vessel, rather than sitting or standing within the vessel's hull.
Pod drive means an engine mounted in front of the transom of a vessel and attached through the bottom of the hull to a steerable propulsion unit.
Pontoon boat means a vessel with a broad, flat deck that is affixed on top of closed cylinders which are used for buoyancy, the basic design of which is usually implemented with two rows of floats as a catamaran or with three rows of floats as a trimaran.
Reporting authority means a State listed in appendix A of this part as having a numbering system approved by the Coast Guard or the Coast Guard itself when a numbering system has not been approved.
Rowboat means an open vessel manually propelled by oars.
Sail only means a vessel propelled only by sails.
State means a State of the United States, the District of Columbia, American Samoa, Guam, the Commonwealth of the Northern Mariana Islands, Puerto Rico, the U.S. Virgin Islands, and any other territory or possession of the United States.
State of principal operation means the State in whose waters a vessel is or will be operated most during a calendar year.
Sterndrive means an engine, powering a propeller through a series of shafts and gears, mounted in front of the transom of a vessel and attached through the transom to a drive unit that is similar to the lower unit of an outboard; and may also be known as an inboard-outdrive or an inboard-outboard.
Vessel means every description of watercraft or other artificial contrivance used or capable of being used as a means of transportation on water.
[USCG-2003-14963, 77 FR 18699, Mar. 28, 2012]
Subpart B Numbering
§ 173.11 Applicability.
This subpart applies to each vessel equipped with propulsion machinery of any type used on waters subject to the jurisdiction of the United States and on the high seas beyond the territorial seas for vessels owned in the United States except:
(a) Foreign vessels temporarily using waters subject to U.S. jurisdiction;
(b) Military or public vessels of the United States, except recreational-type public vessels;
(c) A vessel whose owner is a State or subdivision thereof, which is used principally for governmental purposes, and which is clearly identifiable as such;
(d) Ships' lifeboats;
(e) A vessel which has or is required to have a valid marine document as a vessel of the United States.
§ 173.13 Exemptions.
Where the Coast Guard issues numbers, the following classes of vessels are exempt, under Section 12303 of Title 46, United States Code, from the numbering provisions of Sections 12301 and 12302 of Title 46, United States Code, and this part:
(a) A vessel that is used exclusively for racing.
(b) A vessel equipped with propulsion machinery of less than 10 horsepower that:
(1) Is owned by the owner of a vessel for which a valid certificate of number has been issued;
(2) Displays the number of that numbered vessel followed by the suffix “1” in the manner prescribed in § 173.27; and
(3) Is used as a tender for direct transportation between that vessel and the shore and for no other purpose.
§ 173.15 Vessel number required.
(a) Except as provided in § 173.17, no person may use a vessel to which this part applies unless:
(1) It has a number issued on a certificate of number by the issuing authority in the State of principal operation; and
(2) The number is displayed as described in § 173.27.
(b) This section does not apply to a vessel for which a valid temporary certificate has been issued to its owner by the issuing authority in the State of principal operation.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-14963, 77 FR 18699, Mar. 28, 2012]
§ 173.17 Reciprocity.
(a) Section 12302(c) of Title 46, United States Code, states:
When a vessel is numbered in a State, it is deemed in compliance with the numbering system of a State in which it temporarily is operated.
(b) Section 12302(d) of Title 46, United States Code, states:
When a vessel is removed to a new State of principal operation, the issuing authority of that State shall recognize the validity of the number issued by the original State for 60 days.
[CGD 89-048, 54 FR 27002, June 27, 1989]
§ 173.19 Other numbers prohibited.
No person may operate a vessel to which this part applies that has any number that is not issued by an issuing authority for that vessel on its forward half.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-14963, 77 FR 18699, Mar. 28, 2012]
§ 173.21 Certificate of number required.
(a) Except as provided in §§ 173.13 and 173.17, no person may operate a vessel to which this part applies unless they have on board in hard copy or digital form:
(1) A valid certificate of number or temporary certificate for that vessel issued by the issuing authority in the State in which the vessel is principally operated; or
(2) For the vessel described in paragraph (b) of this section, a copy of the lease or rental agreement, signed by the owner or his or her authorized representative and by the person leasing or renting the vessel, that contains at least:
(i) The vessel number that appears on the certificate of number; and
(ii) The period of time for which the vessel is leased or rented.
(b) Section 12304(a) of Title 46, United States Code, states in part: The certificate of number for a vessel less than 26 feet in length and leased or rented to another for the latter's noncommercial operation of less than 7 days may be retained on shore by the vessel's owner or representative at the place from which the vessel departs or returns to the possession of the owner or the owner's representative.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by CGD 77-117A, 43 FR 17941, Apr. 27, 1978; CGD 89-048, 54 FR 27002, June 27, 1989; USCG-2003-15404, 68 FR 37742, June 25, 2003; USCG-2003-14963, 77 FR 18699, Mar. 28, 2012; 89 FR 47983, July 5, 2024]
§ 173.23 Inspection of certificate.
Each person operating a vessel to which this part applies shall present the certificate or lease or rental agreement required by § 173.21 to any Federal, State, or local law enforcement officer for inspection at his or her request.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-15404, 68 FR 37742, June 25, 2003; USCG-2003-14963, 77 FR 18700, Mar. 28, 2012]
§ 173.25 Location of certificate of number.
No person may operate a vessel to which this part applies unless the certificate or lease or rental agreement required by § 173.21 is carried on board in such a manner that it can be handed to a person authorized under § 173.23 to inspect it.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-14963, 77 FR 18700, Mar. 28, 2012]
§ 173.27 Numbers: Display; size; color.
(a) Each number required by § 173.15 must:
(1) Be painted on or permanently attached to each side of the forward half of the vessel except as allowed by paragraph (b) or required by paragraph (c) of this section;
(2) Be in plain vertical block characters of not less than 3 inches in height;
(3) Contrast with the color of the background and be distinctly visible and legible;
(4) Have spaces or hyphens that are equal to the width of a letter other than “I” or a number other than “1” between the letter and number groupings (Example: DC 5678 EF or DC-5678-EF); and
(5) Read from left to right.
(b) When a vessel is used by a manufacturer or by a dealer for testing or demonstrating, the number may be painted on or attached to removable plates that are temporarily but firmly attached to each side of the forward half of the vessel.
(c) On vessels so configured that a number on the hull or superstructure would not be easily visible, the number must be painted on or attached to a backing plate that is attached to the forward half of the vessel so that the number is visible from each side of the vessel.
(d) Each number displayed on a tender exempted under § 173.13 must meet the requirements of paragraph (a) of this section and have a space or hyphen that is equal to the width of a letter other than “I” or a number other than “1” between the suffix and the number. (Example: DC 5678 EF 1 or DC-5678-EF-1.)
§ 173.29 Notification to issuing authority.
A person whose name appears as the owner of a vessel on a certificate of number shall, within 15 days, notify the issuing authority in a manner prescribed by the issuing authority of:
(a) Any change in his or her address;
(b) The theft or recovery of the vessel;
(c) The loss or destruction of a valid certificate of number;
(d) The transfer of all or part of his or her interest in the vessel; and
(e) The destruction or abandonment of the vessel.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-15404, 68 FR 37742, June 25, 2003]
§ 173.31 Surrender of certificate of number.
A person whose name appears as the owner of a vessel on a certificate of number shall surrender the certificate in a manner prescribed by the issuing authority within 15 days after it becomes invalid under paragraph (b), (c), (d), or (e) of § 173.77.
§ 173.33 Removal of number.
The person whose name appears on a certificate of number as the owner of a vessel shall remove the number and validation sticker from the vessel when:
(a) The vessel is documented by the Coast Guard;
(b) The certificate of number is invalid under paragraph (c) of § 173.77; or
(c) The vessel is no longer principally operated in the State where the certificate was issued.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-14963, 77 FR 18700, Mar. 28, 2012]
§ 173.35 Coast Guard validation sticker.
No person may operate a vessel except a vessel exempted in § 173.13 that has a number issued by the Coast Guard unless it has the validation sticker issued with the certificate of number displayed within 6 inches of the number.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-14963, 77 FR 18700, Mar. 28, 2012]
Subpart C Casualty and Accident Reporting
§ 173.51 Applicability.
(a) This subpart applies to each vessel operated on waters subject to the jurisdiction of the United States and on the high seas beyond the territorial seas for vessels owned in the United States that:
(1) Is operated by its operator for recreational purposes; or
(2) Is required to be numbered under this part.
(b) This subpart does not apply to a vessel subject to inspection under Title 46 U.S.C. Chapter 33.
[CDG 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by CDG 84-099, 52 FR 47533, Dec. 14, 1987; USCG-2003-14963, 77 FR 18700, Mar. 28, 2012]
§ 173.53 Immediate notification of death or disappearance.
(a) When, as a result of an occurrence that involves a vessel or its equipment, a person dies or disappears from a vessel, the operator shall, without delay, by the quickest means available, notify the nearest reporting authority listed in appendix A of this part of:
(1) The date, time, and exact location of the occurrence;
(2) The name of each person who died or disappeared;
(3) The number and name of the vessel; and
(4) The names and addresses of the owner and operator.
(b) When the operator of a vessel cannot give the notice required by paragraph (a) of this section, each person on board the vessel shall notify the casualty reporting authority or determine that the notice has been given.
§ 173.55 Report of casualty or accident.
(a) The operator of a vessel shall submit the casualty or accident report prescribed in § 173.57 to the reporting authority prescribed in § 173.59 when, as a result of an occurrence that involves the vessel or its equipment:
(1) A person dies;
(2) A person is injured and requires medical treatment beyond first aid;
(3) Damage to vessels and other property totals $2,000 or more or there is a complete loss of any vessel;
(4) A person disappears from the vessel under circumstances that indicate death or injury.
(b) A report required by this section must be made:
(1) Within 48 hours of the occurrence if a person dies within 24 hours of the occurrence;
(2) Within 48 hours of the occurrence if a person is injured and requires medical treatment beyond first aid, or disappears from a vessel; and
(3) Within 10 days of the occurrence or death if an earlier report is not required by this paragraph.
(c) When the operator of a vessel cannot submit the casualty or accident report required by paragraph (a) of this section, the owner shall submit the casualty or accident report.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by CGD 76-155, 44 FR 5308, Jan. 25, 1979; CGD 82-015, 54 FR 5610, Feb. 6, 1989; USCG-1999-6094, 66 FR 21675, May 1, 2001; 66 FR 33845, June 26, 2001; USCG-1999-6094, 67 FR 14645, Mar. 27, 2002]
§ 173.57 Contents of report.
(a) Each report required by § 173.55 of this subpart must be in writing, dated upon completion, and signed by the person who prepared it.
(b) Each report must contain, if available, at least the following information about the casualty or accident:
(1) Number and name of each vessel involved;
(2) Name and address of each owner of each vessel involved;
(3) Name of the nearest city or town, the county, the State, and the body of water;
(4) Time and date the casualty or accident occurred;
(5) Location on the water;
(6) Visibility, weather, and water conditions;
(7) Estimated air and water temperatures;
(8) Name, address, age, or date of birth, telephone number, vessel operating experience, and boating safety training of the operator making the report;
(9) Name and address of each operator of each vessel involved;
(10) Number of persons onboard or towed on skis by each vessel;
(11) Name, address, and date of birth of each person injured or killed;
(12) Cause of each death;
(13) Weather forecasts available to and weather reports used by the operator before and during the use of the vessel;
(14) Name and address of each owner of property involved;
(15) Availability and use of personal flotation devices;
(16) Type and number of each fire extinguisher used;
(17) Nature and extent of each injury;
(18) Description of all property damage and vessel damage with an estimate of the cost of all repairs;
(19) Description of each equipment failure that caused or contributed to the cause of the casualty;
(20) Description of the vessel casualty or accident;
(21) Type of vessel operation (cruising, drifting, fishing, hunting, skiing, racing, or other), and the type of accident (capsizing, sinking, fire, explosion, or other);
(22) Opinion of the person making the report as to the cause of the casualty, including whether or not alcohol or drugs, or both, was a cause of or contributed to causing the casualty.
(23) Characteristics of the reporting operator's vessel, including—
(i) Make;
(ii) Model;
(iii) Type: authorized terms are “air boat”, “auxiliary sail”, “cabin motorboat”, “houseboat”, “inflatable boat”, “open motorboat”, “paddlecraft”, “personal watercraft”, “pontoon boat”, “rowboat”, “sail only”, or “other”;
(iv) Beam width at widest point;
(v) Overall length of vessel;
(vi) Depth from transom to keel;
(vii) Horsepower;
(viii) Propulsion: authorized terms are “air thrust”, “manual”, “propeller”, “sail”, “water jet”, or “other”;
(ix) Fuel: authorized terms are “electric”, “diesel”, “gas”, or “other”;
(x) Engine drive type: authorized terms are “inboard”, “outboard”, “pod drive”, “sterndrive”, or “other”;
(xi) Hull material: authorized terms are “aluminum”, “fiberglass”, “plastic”, “rubber/vinyl/canvas”, “steel”, “wood”, or “other”; and
(xii) Model year;
(24) Name, address, and telephone number of each witness;
(25) Manufacturer's hull identification number, if any, of the reporting operator's vessel; and
(26) Name, address, and telephone number of the person submitting the report.
[USCG-2003-14963, 77 FR 18700, Mar. 28, 2012, as amended at USCG-2021-0348, 87 FR 3223, Jan. 21, 2022]
§ 173.59 Where to submit report.
A report required by § 173.55 must be submitted to:
(a) The reporting authority listed in appendix A of this part where the vessel number was issued, or, if the vessel has no number, where the vessel is principally used; or
(b) The reporting authority where the casualty or accident occurred, if it occurred outside the State where the vessel is numbered or principally used.
Subpart D Issue of Certificate of Number
§ 173.71 Application for and issuance of certificate of number.
(a) The owner of a vessel to which § 173.11 of this part applies and for which a certificate of number is required may apply for that certificate to the issuing authority for the vessel's State of principal operation listed in appendix A of this part. The application must be made in the manner specified by the issuing authority and must be accompanied by payment of any fee required by the issuing authority.
(b) Upon determination that the owner's application for a certificate of number complies with the requirements of paragraph (a) of this section, the issuing authority may issue a certificate of number.
(c) A duplicate certificate of number may be applied for and issued as provided by paragraphs (a) and (b) of this section upon the owner's statement that the original certificate is lost or destroyed.
[USCG-2003-14963, 77 FR 18700, Mar. 28, 2012]
§ 173.73 [Reserved]
§ 173.75 Temporary certificate.
A temporary certificate valid for not more than 60 days after it is issued may be issued by an issuing authority pending the issue of a certificate of number. A temporary certificate is not valid after the date that the owner receives the certificate of number from the issuing authority.
§ 173.77 Validity of certificate of number.
(a) Except as provided in paragraphs (b), (c), (d), and (e) of this section, a certificate of number is valid until the date of expiration prescribed by the issuing authority.
(b) A certificate of number issued by an issuing authority is invalid after the date upon which:
(1) The vessel is documented or required to be documented under Part 67 of Title 46, Code of Federal Regulations;
(2) The person whose name appears on the certificate of number as owner of the vessel transfer all of his or her ownership in the vessel; or
(3) The vessel is destroyed or abandoned.
(c) A certificate of number issued by an issuing authority is invalid if:
(1) The application for the certificate of number contains a false or fraudulent statement; or
(2) The fees for the issuance of the certificate of number are not paid.
(d) A certificate of number is invalid 60 days after the day on which the vessel is no longer principally operated in the State where the certificate was issued.
(e) The certificate of number is invalid when the person whose name appears on the certificate involuntarily loses his or her interest in the numbered vessel by legal process.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by USCG-2003-15404, 68 FR 37742, June 25, 2003; USCG-2003-14963, 77 FR 18701, Mar. 28, 2012]
§ 173.79 Expiration of Coast Guard certificate of number.
A certificate of number issued by the Coast Guard expires 3 years from the date it is issued.
§ 173.81 Coast Guard forms for numbering and casualty reporting.
(a) In a State where the Coast Guard is the issuing authority, the following Coast Guard forms must be used:
(1) Each application for a certificate of number or renewal must be made on two-part Form CG-3876 and 3876A, Application for Number and Temporary Certificate.
(2) Each notification required by § 173.29(b) must be made on Form CG-2921, Notification of Change in Status of Vessel.
(3) Each notification required by § 173.29(a) must be made on Form CG-3920, Change of Address Notice.
(4) Each notification required by § 173.29(c) must be made in writing.
(5) Each application for a duplicate certificate of number must be made on two-part Form CG-3919 and CG-3919A, Application for Duplicate Certificate of Number and Temporary Duplicate Certificate.
(6) Each vessel casualty required to be reported by § 173.55 must be made on Form CG-3865.
(b) Each surrender of a certificate of number required by § 173.31 may be made in any form but must contain a written statement as to why the certificate is being surrendered.
§ 173.83 Availability of Coast Guard forms.
In a State where the Coast Guard is the issuing authority, forms required by § 173.81 are available at all manned Coast Guard shore units, except light and loran stations and except for Form CG-3865, at all first- and second-class and some third- and fourth-class post offices.
§ 173.85 Fees levied by the Coast Guard.
(a) In a State where the Coast Guard is the issuing authority, the fees for issuing certificates of number are:
(1) Original or transferred certificate of number and two validation stickers—$24.
(2) Renewed certificate of number and two validation stickers—$16.
(3) Duplicate certificate of number—$9.
(4) Replacement of lost or destroyed validation stickers—$9.
(b) Fees are payable by check or money-order made payable to the “U.S. Coast Guard”; by major credit card (MasterCard or Visa); or, when the owner applies in person, in cash.
[USCG-1998-3386, 64 FR 36243, July 6, 1999]
0
Appendix A to Part 173 Issuing Authorities and Reporting Authorities
(a) The State is the issuing authority and reporting authority in:
state
Alabama—AL.
Alaska—AK.
American Samoa—AS.
Arizona—AZ.
Arkansas—AR.
California—CF.
Colorado—CL.
Connecticut—CT.
Delaware—DL.
District of Colum-
bia—DC.
Florida—FL.
Georgia—GA.
Guam—GU.
Hawaii—HA.
Idaho—ID.
Illinois—IL.
Indiana—IN.
Iowa—IA.
Kansas—KA.
Kentucky—KY.
Louisiana—LA.
Maine—ME.
Maryland—MD.
Massachusetts—MS.
Michigan—MC.
Minnesota—MN.
Mississippi—MI.
Missouri—MO.
Montana—MT.
Nebraska—NB.
Nevada—NV.
New Hampshire—NH.
New Jersey—NJ.
New Mexico—NM.
New York—NY.
North Carolina—NC.
North Dakota—ND.
Northern Mariana Islands—CM.
Ohio—OH.
Oklahoma—OK.
Oregon—OR.
Pennsylvania—PA.
Puerto Rico—PR.
Rhode Island—RI.
South Carolina—SC.
South Dakota—SD.
Tennessee—TN.
Texas—TX.
Utah—UT.
Vermont—VT.
Virginia—VA.
Virgin Islands—VI.
Washington—WN.
West Virginia—WV.
Wisconsin—WS.
Wyoming—WY.
(b) The Coast Guard is the issuing authority and reporting authority in:
state
[Reserved]
(c) The abbreviations following the names of the State listed in paragraphs (a) and (b) are the two capital letters that must be used in the number format to denote the State of principal operation as prescribed in § 174.23 of this chapter.
[CGD 72-54R, 37 FR 21399, Oct. 7, 1972, as amended by CGD 76-076, 41 FR 23401, June 10, 1976; CGD 89-048, 54 FR 27002, June 27, 1989; USCG-2001-9286, 66 FR 33642, June 25, 2001; USCG-2003-14963, 77 FR 18701, Mar. 28, 2012]
PART 174 STATE NUMBERING AND CASUALTY REPORTING SYSTEMS
Authority: 46 U.S.C. 6101 and 12302; DHS Delegation No. 00170.1, Revision No. 01.4.
Source: CGD 72-54R, 37 FR 21402, Oct. 7, 1972, unless otherwise noted.
Subpart A General
§ 174.1 Applicability; preemptive effect.
This part establishes a standard numbering system for vessels and a uniform vessel casualty reporting system for vessels by prescribing requirements applicable to the States for the approval of State numbering systems. The regulations in subparts A, B, and D of this part have preemptive effect over conflicting State or local regulation. The regulations in subpart C of this part have preemptive effect over State or local regulation within the same field, except to the extent that Congress requires the Coast Guard to allow State casualty reporting systems pursuant to 46 U.S.C. chapter 131.
[USCG-2003-14963, 77 FR 18701, Mar. 28, 2012]
§ 174.3 Definitions.
As used in this part—
Airboat means a vessel that is typically flat-bottomed and propelled by an aircraft-type propeller powered by an engine.
Auxiliary sail means a vessel with sail as its primary method of propulsion and mechanical propulsion as its secondary method.
Cabin motorboat means a vessel propelled by propulsion machinery and providing enclosed spaces inside its structure.
Certificate of number means the certificate required by 33 CFR 173.21.
Charter fishing means a vessel carrying a passenger(s) for hire who is (are) engaged in recreational fishing.
Commercial fishing means a vessel that commercially engages in the catching, taking, or harvesting of fish which, either in whole or in part, is intended to enter commerce through sale, barter, or trade.
Houseboat means a motorized vessel that is usually non-planing and designed primarily for multi-purpose accommodation spaces with low freeboard and little or no foredeck or cockpit.
Hull identification number or HIN means a number required by 33 CFR 181.23.
Inboard, in the context of an engine, means an engine mounted inside the confines of a vessel which powers a drive shaft that turns a water jet impeller or that runs through the bottom of the hull and is attached to a propeller at the other end.
Inflatable boat means a vessel that uses air-filled flexible fabric for buoyancy.
Open motorboat means a vessel equipped with propulsion machinery and having an open load carrying area that does not have a continuous deck to protect it from the entry of water.
Operate means use, navigate, or employ.
Operator means the person who is in control or in charge of a vessel while it is in operation.
Outboard, in the context of an engine, means an engine with propeller or water jet integrally attached, which is usually mounted at the stern of a vessel.
Owner means a person, other than a secured party, having property rights in or title to a vessel, including persons entitled to use or possess a vessel subject to a security interest in another person, but excluding lessees under a lease not intended as security.
Paddlecraft means a vessel powered only by its occupants, using a single or double bladed paddle as a lever without the aid of a fulcrum provided by oarlocks, thole pins, crutches, or similar arrangements.
Person means an individual, firm, partnership, corporation, company, association, joint-stock association, or governmental entity and includes a trustee, receiver, assignee, or similar representative of any of them.
Personal watercraft means a vessel propelled by a water-jet pump or other machinery as its primary source of motive power and designed to be operated by a person sitting, standing, or kneeling on the vessel, rather than sitting or standing within the vessel's hull.
Pod drive means an engine mounted in front of the transom of a vessel and attached through the bottom of the hull to a steerable propulsion unit.
Pontoon boat means a vessel with a broad, flat deck that is affixed on top of closed cylinders which are used for buoyancy, the basic design of which is usually implemented with two rows of floats as a catamaran or with three rows of floats as a trimaran.
Reporting authority means a State listed in 33 CFR part 173, appendix A, as having a numbering system approved by the Coast Guard or the Coast Guard itself when a numbering system has not been approved.
Rowboat means an open vessel manually propelled by oars.
Sail only means a vessel propelled only by sails.
State means a State of the United States, the District of Columbia, American Samoa, Guam, the Commonwealth of the Northern Mariana Islands, Puerto Rico, the U.S. Virgin Islands, and any other territory or possession of the United States.
State of principal operation means the State in whose waters a vessel is or will be operated most during a calendar year.
Sterndrive means an engine, powering a propeller using shifts and gears, mounted in front of the transom of a vessel and attached through the transom to a drive unit that is similar to the lower unit of an outboard, which may also be known as an inboard-outdrive or an inboard-outboard.
Vessel means every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on water.
[USCG-2003-14963, 77 FR 18701, Mar. 28, 2012]
§ 174.5 Requirements for approval.
The Commandant approves a State numbering system if he or she finds, after examination of the information submitted by a State, that the State numbering system and vessel casualty reporting system meet the requirements of this part, 46 U.S.C. 6102, and 46 U.S.C. Chapter 123.
[CGD 97-023, 62 FR 33365, June 19, 1997, as amended by USCG-1998-3799, 63 FR 35533, June 30, 1998; USCG-2003-15404, 68 FR 37742, June 25, 2003]
§ 174.7 Approval procedure.
To obtain approval by the Commandant of a numbering system or of any revision to a numbering system, an authorized representative of the State must submit three copies of the State laws, regulations, forms, and policy statements, if any, that pertain to the numbering system or revision to Commandant (CG-BSX), Attn: Office of Auxiliary and Boating Safety, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501.
[CGD 72-54R, 37 FR 21402, Oct. 7, 1972, as amended by CGD 82-010, 48 FR 8273, Feb. 28, 1983; CGD 88-052, 53 FR 25122, July 1, 1988; CGD 96-026, 61 FR 33669, June 28, 1996; USCG-2008-0179, 73 FR 35024, June 19, 2008; USCG-2010-0351, 75 FR 36287, June 25, 2010; USCG-2014-0410, 79 FR 38448, July 7, 2014]
Subpart B Numbering System Requirements
§ 174.11 Applicability of State numbering system.
(a) Except as allowed in paragraph (c) of this section, a State numbering system must require the numbering of vessels to which § 173.11 of this chapter applies.
(b) A State numbering system may require the numbering of any vessel subject to the jurisdiction of the State unless prohibited by the regulations in part 173 of this chapter.
(c) A State numbering system may exempt from its numbering requirements any vessel or class of vessels to which § 173.13 of this chapter applies.
§ 174.13 Owner or operator requirements.
A State numbering system must contain the requirements applicable to an owner or a person operating a vessel that are prescribed in the following sections of part 173:
(a) Paragraph (a) of § 173.15 Vessel number required.
(b) Section 173.19 Other numbers prohibited.
(c) Paragraph (a) of § 173.21 Certificate of number required.
(d) Section 173.23 Inspection of certificate.
(e) Section 173.25 Location of certificate of number.
(f) Section 173.29 Notification of issuing authority.
(g) Section 173.71 Application for certificate of number.
(h) Section 173.73 Duplicate certificate of number.
(i) Section 173.77 Validity of certificate of number.
(46 U.S.C. 1451, 1467, 1488; 49 CFR 1.46(n)(1))
[CGD 77-117, 44 FR 42195, July 19, 1979]
§ 174.14 State numbering system optional sections.
In addition to the requirements in § 174.13, a State numbering system may contain any of the other requirements applicable to a vessel owner or operator prescribed in part 173.
(46 U.S.C. 1451, 1467, 1488; 49 CFR 1.46(n)(1))
[CGD 77-117, 44 FR 42195, July 19, 1979, as amended by USCG-1999-5832, 64 FR 34715, June 29, 1999]
§ 174.15 Validation stickers.
(a) If a State issues validation stickers, its numbering system must contain the requirements that stickers must be displayed within 6 inches of the number and the stickers must meet the requirements in paragraphs (b) and (c) of this section.
(b) Validation stickers must be approximately 3 inches square.
(c) The year in which each validation sticker expires must be indicated by the colors, blue, international orange, green, and red, in rotation beginning with blue for stickers that expire in 1973.
§ 174.16 Verification of hull identification numbers (HINs).
(a) As used in this section, “action” means an action by an issuing authority listed in 33 CFR part 173, appendix A, to issue, renew, or update the ownership information for a certificate of number under this part but does not include the issuance of a temporary certificate under 33 CFR 174.21.
(b) As of January 1, 2017, before taking any action relating to a vessel imported or manufactured on or after November 1, 1972, the issuing authority must determine whether the vessel has a primary HIN meeting the requirements of 33 CFR part 181, subpart C.
(c) If, pursuant to paragraph (b) of this section, the issuing authority determines that the vessel does not have a primary HIN meeting the requirements of 33 CFR part 181, subpart C, then before taking any action the issuing authority must—
(1) Assign such a primary HIN to the vessel; and
(2) Verify that the owner of the vessel has permanently affixed the assigned primary HIN to the vessel in compliance with 33 CFR part 181, subpart C.
[USCG-2003-14963, 77 FR 18701, Mar. 28, 2012]
§ 174.17 Contents of application for certificate of number.
(a) An application for a certificate of number must contain the following information:
(1) Name of owner.
(2) Address of owner, including ZIP code.
(3) Owner identifier, which must be the owner's tax identification number, date of birth together with driver's license number, or date of birth together with other unique number.
(4) State of principal operation.
(5) Number previously issued by an issuing authority.
(6) Application type: Authorized terms are “new number”, “renewal of number”, or “transfer of ownership”.
(7) Primary operation: Authorized terms are, “charter fishing”, “commercial fishing”, “commercial passenger carrying”, “dealer or manufacturer demonstration”, “other commercial operation”, “pleasure”, or “rent or lease”.
(8) Make and model of vessel.
(9) Model year.
(10) Hull identification number, if any.
(11) Overall length of vessel.
(12) Vessel type: Authorized terms are “air boat”, “auxiliary sail”, “cabin motorboat”, “houseboat”, “inflatable boat”, “open motorboat”, “paddlecraft”, “personal watercraft”, “pontoon boat”, “rowboat”, “sail only”, or “other”.
(13) Hull material: Authorized terms are “aluminum”, “fiberglass”, “plastic”, “rubber/vinyl/canvas”, “steel”, “wood”, or “other”.
(14) Propulsion type: Authorized terms are “air thrust”, “manual”, “propeller”, “sail”, “water jet”, or “other”.
(15) Engine drive type: Authorized terms are “inboard”, “outboard”, “pod drive”, “sterndrive”, or “other”.
(16) Fuel: Authorized terms are “electric”, “diesel”, “gas”, or “other”.
(17) Signature of the owner.
(b)(1) An application made by a manufacturer or dealer for a number that is to be temporarily affixed to a vessel for demonstration or test purposes may omit the information under paragraphs (a)(9) through (a)(17) of this section.
(2) An application made by an owner of a vessel without propulsion machinery may omit the information under paragraphs (a)(16) and (a)(17) of this section.
[USCG-2003-14963, 77 FR 18702, Mar. 28, 2012, as amended by USCG-2024-1103, 90 FR 52879, Nov. 24, 2025]
§ 174.19 Contents of a certificate of number.
(a) Except as allowed in paragraph (b) of this section, each certificate of number must contain the following information:
(1) Number issued to the vessel.
(2) Expiration date of the certificate.
(3) State of principal operation.
(4) Name of owner.
(5) Address of owner, including ZIP code.
(6) Primary operation: Authorized terms are, “charter fishing”, “commercial fishing”, “commercial passenger carrying”, “dealer or manufacturer demonstration”, “other commercial operation”, “pleasure”, or “rent or lease”.
(7) Hull identification number, if any.
(8) Make and model of vessel.
(9) Model year.
(10) Overall length of vessel.
(11) Vessel type: Authorized terms are “air boat”, “auxiliary sail”, “cabin motorboat”, “houseboat”, “inflatable boat”, “open motorboat”, “paddlecraft”, “personal watercraft”, “pontoon boat”, “rowboat”, “sail only”, or “other”.
(12) Hull material: Authorized terms are “aluminum”, “fiberglass”, “plastic”, “rubber/vinyl/canvas”, “steel”, “wood”, or “other”.
(13) Propulsion type: Authorized terms are “air thrust”, “manual”, “propeller”, “sail”, “water jet”, or “other”.
(14) Engine drive type: Authorized terms are “inboard”, “outboard”, “pod drive”, “sterndrive”, or “other”.
(15) Fuel: Authorized terms are “electric”, “diesel”, “gas”, or “other”.
(b)(1) A certificate of number issued to a manufacturer or dealer for use on a vessel for test or demonstration purposes may omit the information under paragraphs (a)(7) through (a)(15) of this section if the word “manufacturer” or “dealer” is plainly marked on the certificate.
(2) A certificate of number issued for a vessel without propulsion machinery may omit paragraphs (a)(14) and (a)(15) of this section if the words “manual vessel” are plainly marked on the certificate.
(3) An issuing authority may print on the certificate of number a quotation of State boating regulations or other boating-related information, such as safety reminders, registration, or law enforcement contact information.
[USCG-2003-14963, 77 FR 18702, Mar. 28, 2012, as amended by USCG-2024-1103, 90 FR 52879, Nov. 24, 2025]
§ 174.21 Temporary certificates.
(a) An issuing authority may issue a temporary certificate of number, valid for no more than 60 days from its date of issuance.
(b) Each temporary certificate must contain the following information:
(1) Vessel's hull identification number, if any.
(2) Make of vessel.
(3) Overall length of vessel.
(4) Type of propulsion.
(5) State in which vessel is principally operated.
(6) Name of owner.
(7) Address of owner, including ZIP code.
(8) Signature of owner.
(9) Date of issuance.
(10) Notice to the owner that the temporary certificate is valid for the time it specifies, not to exceed 60 days from the date of issuance.
(c) For an issuing authority listed in 33 CFR part 173, appendix A on April 27, 2012, the requirements of paragraph (b) of this section apply on January 1, 2017. Between April 27, 2012 and January 1, 2017, the issuing authority may continue to issue temporary certificates containing the contents in effect on April 27, 2012.
[USCG-2003-14963, 77 FR 18702, Mar. 28, 2012]
§ 174.23 Form of number.
(a) Each number must consist of two capital letters denoting the State of the issuing authority, as specified in appendix A of part 173 of this chapter, followed by—
(1) Not more than four numerals followed by not more than two capital letters (example: NH 1234 BD); or
(2) Not more than three numerals followed by not more than three capital letters (example: WN 567 EFG).
(b) A number suffix must not include the letters “I”, “O”, or “Q,” which may be mistaken for numerals.
§ 174.25 Size of certificate of number.
Each certificate of number must be in hard copy or digital form. Any certificate issued in hard copy under this section must be pocketsized.
[89 FR 47963, June 4, 2024]
§ 174.27 Duration of certificate of number.
A certificate of number must not be valid for more than 3 years.
§ 174.29 Temporary certificate of number.
A State may issue a temporary certificate of number that is effective for not more than 60 days.
§ 174.31 Terms imposed by States for numbering of vessels.
A State numbering system may condition the issuance of a certificate of number on—
(a) Title to, or other proof of ownership of a vessel except a recreational-type public vessel of the United States; or
(b) Proof of liability insurance for a vessel except a recreational-type public vessel of the United States; or
(c) Proof of payment of State or local taxes, except for a recreational-type public vessel of the United States.
[CGD 72-54R, 37 FR 21402, Oct. 7, 1972, as amended by USCG-2003-15708, 70 FR 13105, Mar. 18, 2005; USCG-2022-0323, 88 FR 10029, Feb. 16, 2023]
Subpart C Casualty Reporting System Requirements
§ 174.101 Applicability of State casualty reporting system.
(a) A State casualty reporting system must require the reporting of vessel casualties and accidents involving vessels to which § 173.51 of this chapter applies.
(b) The State casualty reporting system may also require vessel casualty or accident reports for property damage in amounts less than that required under § 173.55 of this chapter.
(46 U.S.C. 1486; 49 CFR 1.46(n)(1))
[CGD 72-54R, 37 FR 21402, Oct. 7, 1972, as amended by CGD 76-155, 44 FR 5309, Mar. 25, 1979; CGD 82-015, 54 FR 5610, Feb. 6, 1989]
§ 174.103 Administration.
The State casualty reporting system must be administered by a State agency that—
(a) Will provide for the reporting of all casualties and accidents prescribed in § 173.55 of this chapter;
(b) Receives reports of vessel casualties or accidents required in § 174.101;
(c) Reviews each accident and casualty report to assure the accuracy and completeness of each report;
(d) Determines the cause of casualties and accidents reported based on information available and indicates the apparent cause on the casualty report or on an attached page;
(e) Notifies the Coast Guard, in writing, when a problem area in boating safety peculiar to the State is determined, together, with corrective measures instituted or recommended; and
(f) Reports on vessel numbering and vessel casualties and accidents as required in subpart D of this part.
(46 U.S.C. 1486; 49 CFR 1.46(n)(1))
[CGD 72-54R, 37 FR 21402, Oct. 7, 1972, as amended by CGD 76-155, 44 FR 5309, Mar. 25, 1979]
§ 174.105 Owner or operator casualty reporting requirements.
A State casualty reporting system must contain the following requirements of part 173 applicable to an owner or a person operating a vessel:
(a) Section 173.55 Report of casualty or accident.
(b) Section 173.57 Casualty or accident report.
(c) Section 173.59 Where to report.
(46 U.S.C. 1451, 1467, 1488; 49 CFR 1.46 (n)(1))
[CGD 77-117, 44 FR 42195, July 19, 1979]
§ 174.106 State casualty reporting system optional sections.
In addition to the requirements in § 174.105, a State casualty reporting system may contain any of the other requirements applicable to a vessel owner or operator prescribed in Part 173.
(46 U.S.C. 1451, 1467, 1488; 49 CFR 1.46 (n)(1))
[CGD 77-117, 44 FR 42195, July 19, 1979, as amended by USCG-1999-5832, 64 FR 34715, June 29, 1999]
§ 174.107 Contents of casualty or accident report form.
Each form for reporting a vessel casualty or accident must contain the information required in § 173.57 of this chapter.
Subpart D State Reports
§ 174.121 Forwarding of casualty or accident reports.
Within 30 days of the receipt of a casualty or accident report, the reporting authority receiving the report must forward a paper or electronic copy of that report to the Commandant (CG-BSX-2), Attn: Boating Safety Division, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501.
[USCG-2003-14963, 77 FR 18702, Mar. 28, 2012, as amended by USCG-2014-0410, 79 FR 38448, July 7, 2014]
§ 174.123 Annual report of vessels.
Before March 1 of each year, each State that has an approved numbering system must prepare and submit Coast Guard Form CGHQ-3923 to the Coast Guard.
[USCG-2016-0498, 82 FR 35089, July 28, 2017]
§ 174.125 Coast Guard address.
The report required by § 174.123 of this subpart must be sent to the Commandant (CG-BSX-2), Attn: Boating Safety Division, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501.
[USCG-2003-14963, 77 FR 18703, Mar. 28, 2012, as amended by USCG-2014-0410, 79 FR 38448, July 7, 2014]
PART 175 EQUIPMENT REQUIREMENTS
Authority: 46 U.S.C. 4302; DHS Delegation No. 00170.1, Revision No. 01.3.
Source: CGD 72-120R, 38 FR 8115, Mar. 28, 1973, unless otherwise noted.
Subpart A General
§ 175.1 Applicability.
This part prescribes rules governing the use of boats on waters subject to the jurisdiction of the United States and on the high seas beyond the territorial seas for boats owned in the United States except:
(a) Foreign boats temporarily using waters subject to U.S. jurisdiction;
(b) Military or public boats of the United States, except recreational-type public vessels;
(c) A boat whose owner is a State or subdivision thereof, which is used principally for governmental purposes, and which is clearly identifiable as such;
(d) Ship's lifeboats.
(e) Seaplanes on the water.
[CGD 72-120R, 38 FR 8115, Mar. 28, 1973, as amended by CGD 92-045, 58 FR 41607, Aug. 4, 1993]
§ 175.3 Definitions.
As used in this part:
Boat means any vessel—
(1) Manufactured or used primarily for noncommercial use;
(2) Leased, rented, or chartered to another for the latter's noncommercial use; or
(3) Operated as an uninspected passenger vessel subject to the requirements of 46 CFR chapter I, subchapter C.
Model year means the period beginning June 1 of a year and ending on July 31 of the following year and being designated by the year in which it ends.
Passenger means an individual carried on a vessel except—
(1) The owner or an individual representative of the owner or, in the case of a vessel chartered without a crew, an individual charterer, or an individual representative of the charterer;
(2) The master or operator of a recreational vessel; or
(3) A member of the crew engaged in the business of the vessel, who has not contributed consideration for carriage, and who is paid for onboard services.
Racing shell, rowing scull, racing canoe, and racing kayak means a manually propelled vessel that is recognized by national or international racing associations for use in competitive racing and one in which all occupants row, scull, or paddle, with the exception of a coxswain, if one is provided, and is not designed to carry and does not carry any equipment not solely for competitive racing.
Recreational vessel means any vessel being manufactured or operated primarily for pleasure, or leased, rented, or chartered to another for the latter's pleasure. It does not include a vessel engaged in the carriage of passengers-for-hire as defined in 46 CFR chapter I, subchapter C, or in other subchapters of this title.
Sailboard means a sail propelled vessel with no freeboard and equipped with a swivel mounted mast not secured to a hull by guys or stays.
State means a State or Territory of the United States of America, whether a State of the United States, American Samoa, the Commonwealth of the Northern Marianas Islands, the District of Columbia, Guam, Puerto Rico, or the United States Virgin Islands.
Use means operate, navigate, or employ.
Vessel includes every description of watercraft used or capable of being used as a means of transportation on the water.
[CGD 92-045, 58 FR 41607, Aug. 4, 1993, as amended by USCG-1999-5040, 67 FR 34759, May 15, 2002; USCG-2000-8589, 67 FR 42493, June 24, 2002; USCG-2018-0099, 86 FR 58571, Oct. 22, 2021]
§ 175.5 Exemption from preemption.
The States are exempted from preemption by Federal regulations when establishing, continuing in effect, or enforcing State laws and regulations on the wearing or the carriage of personal flotation devices directly related to the following subject areas within the jurisdictional boundaries of the State:
(a) Children on board any vessel;
(b) Operating a canoe or kayak;
(c) Operating a sailboard; and
(d) Operating a personal watercraft.
[CGD 92-045, 58 FR 41608, Aug. 4, 1993]
Subpart B Personal Flotation Devices
§ 175.11 Applicability.
This subpart applies to all recreational vessels that are propelled or controlled by machinery, sails, oars, paddles, poles, or another vessel.
[CGD 92-045, 58 FR 41608, Aug. 4, 1993]
§ 175.13 Definitions.
As used in this subpart:
Personal flotation device or PFD means a device that is approved by the Commandant under 46 CFR part 160.
Throwable PFD means a PFD that is intended to be thrown to a person in the water. A PFD marked as Type IV or Type V with Type IV performance is considered a throwable PFD. Unless specifically marked otherwise, a wearable PFD is not a throwable PFD.
Wearable PFD means a PFD that is intended to be worn or otherwise attached to the body. A PFD marked as Type I, Type II, Type III, or Type V with Type (I, II or III) performance is considered a wearable PFD.
[USCG-2013-0263, 79 FR 56499, Sept. 22, 2014]
§ 175.15 Personal flotation devices required.
Except as provided in §§ 175.17 and 175.25:
(a) No person may use a recreational vessel unless—
(1) At least one wearable PFD is on board for each person;
(2) Each PFD is used in accordance with any requirements on the approval label; and
(3) Each PFD is used in accordance with any requirements in its owner's manual, if the approval label makes reference to such a manual.
(b) No person may use a recreational vessel 16 feet or more in length unless one throwable PFD is onboard in addition to the total number of wearable PFDs required in paragraph (a) of this section.
(c) No person may operate a recreational vessel under way with any child under 13 years old aboard unless each such child is either—
(1) Wearing an appropriate PFD approved by the Coast Guard; or
(2) Below decks or in an enclosed cabin.
[CGD 81-023, 55 FR 32034, Aug. 6, 1990, as amended by CGD 92-045, 58 FR 41608, Aug. 4, 1993; USCG-2000-8589, 67 FR 42493, June 24, 2002; USCG-2013-0263, 79 FR 56499, Sept. 22, 2014]
§ 175.17 Exemptions.
(a) Canoes and kayaks 16 feet or more in length are exempted from the requirements for carriage of the additional throwable PFD required under § 175.15(b).
(b) Racing shells, rowing sculls, racing canoes, and racing kayaks are exempted from the requirements for carriage of any PFD required under § 175.15.
(c) Sailboards are exempted from the requirements for carriage of any PFD required under § 175.15.
(d) Vessels of the United States used by foreign competitors while practicing for or racing in competition are exempted from the carriage of any PFD required under § 175.15, provided the vessel carries one of the sponsoring foreign country's acceptable flotation devices for each foreign competitor onboard.
[USCG-2013-0263, 79 FR 56499, Sept. 22, 2014]
§ 175.19 Stowage.
(a) No person may use a recreational boat unless each wearable PFD required by § 175.15 is readily accessible.
(b) No person may use a recreational boat unless each throwable PFD required by § 175.15 is immediately available.
[USCG-2013-0263, 79 FR 56499, Sept. 22, 2014]
§ 175.21 Condition; size and fit; approval marking.
No person may use a recreational boat unless each PFD required by § 175.15 is—
(a) In serviceable condition as provided in § 175.23;
(b) Of an appropriate size and fit for the intended wearer, as marked on the approval label; and
(c) Legibly marked with its approval number, as specified in 46 CFR part 160.
[CGD 81-023, 55 FR 32034, Aug. 6, 1990, as amended by CGD93-055, 61 FR 13926, Mar. 28, 1996; USCG-2013-0263, 79 FR 56499, Sept. 22, 2014]
§ 175.23 Serviceable condition.
A PFD is considered to be in serviceable condition for purposes of § 175.21(a) only if the following conditions are met:
(a) No PFD may exhibit deterioration that could diminish the performance of the PFD, including—
(1) Metal or plastic hardware used to secure the PFD on the wearer that is broken, deformed, or weakened by corrosion;
(2) Webbings or straps used to secure the PFD on the wearer that are ripped, torn, or which have become separated from an attachment point on the PFD; or
(3) Any other rotted or deteriorated structural component that fails when tugged.
(b) In addition to meeting the requirements of paragraph (a) of this section, no inherently buoyant PFD, including the inherently buoyant components of a hybrid inflatable PFD, may exhibit—
(1) Rips, tears, or open seams in fabric or coatings, that are large enough to allow the loss of buoyant material;
(2) Buoyant material that has become hardened, non-resilient, permanently compressed, waterlogged, oil-soaked, or which shows evidence of fungus or mildew; or
(3) Loss of buoyant material or buoyant material that is not securely held in position.
(c) In addition to meeting the requirements of paragraph (a) of this section, an inflatable PFD, including the inflatable components of a hybrid inflatable PFD, must be equipped with—
(1) Except as provided in paragraph (d) of this section, a properly armed inflation mechanism, complete with a full inflation medium cartridge and all status indicators showing that the inflation mechanism is properly armed;
(2) Inflatable chambers that are all capable of holding air;
(3) Oral inflation tubes that are not blocked, detached, or broken;
(4) A manual inflation lanyard or lever that is not inaccessible, broken, or missing; and
(5) Inflator status indicators that are not broken or otherwise non-functional.
(d) The inflation system of an inflatable PFD need not be armed when the PFD is worn inflated and otherwise meets the requirements of paragraphs (a) and (c) of this section.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 175.25 Enforcement of State requirements for children to wear personal flotation devices.
(a) This section applies to operators of recreational vessels on waters subject to the jurisdiction of any State that has established by statute a requirement for children of a certain age to wear an appropriate PFD approved by the Coast Guard, while aboard a recreational vessel.
(b) If the applicable State statute establishes any requirement for children of a certain age to wear an appropriate PFD approved by the Coast Guard, then that requirement applies on the waters subject to the State's jurisdiction instead of the requirement provided in § 175.15(c) of this part.
[USCG-2000-8589, 69 FR 45591, July 30, 2004]
Subpart C Visual Distress Signals
Source: CGD 76-183, 44 FR 73024, Dec. 17, 1979, unless otherwise noted.
§ 175.101 Applicability.
This subpart applies to boats on the coastal waters of the United States and on the high seas beyond the territorial seas for boats owned in the United States.
[CGD 76-183, 44 FR 73024, Dec. 17, 1979, as amended by USCG-1998-3799, 63 FR 35534, June 30, 1998]
§ 175.105 Definitions.
(a) Visual distress signal means a device that is approved by the Commandant under 46 CFR part 160 or certified by the manufacturer under 46 CFR parts 160 and 161.
(b) Coastal waters means:
(1) The U.S. waters of the Great Lakes (Lake Erie, Huron, Michigan, Ontario, and Superior);
(2) The territorial seas of the United States; and
(3) Those waters directly connected to the Great Lakes and territorial seas (i.e., bays, sounds, harbors, rivers, inlets, etc.) where any entrance exceeds 2 nautical miles between opposite shorelines to the first point where the largest distance between shorelines narrows to 2 miles, as shown on the current edition of the appropriate National Ocean Service chart used for navigation. Shorelines of islands or points of land present within a waterway are considered when determining the distance between opposite shorelines.
[CGD 76-183, 44 FR 73024, Dec. 17, 1979, as amended by CGD 82-073, 49 FR 7119, Feb. 27, 1984; 49 FR 20815, May 17, 1984]
§ 175.110 Visual distress signals required.
(a) No person may use a boat 16 feet or more in length, or any boat operating as an uninspected passenger vessel subject to the requirements of 46 CFR chapter I, subchapter C, unless visual distress signals selected from the list in § 175.130 or the alternatives in § 175.135, in the number required, are onboard. Devices suitable for day use and devices suitable for night use, or devices suitable for both day and night use, must be carried.
(b) Between sunset and sunrise, no person may use a boat less than 16 feet in length unless visual distress signals suitable for night use, selected from the list in § 175.130 or § 175.135, in the number required, are on board.
[CGD 76-183, 44 FR 73024, Dec. 17, 1979, as amended by USCG-1999-5040, 67 FR 34760, May 15, 2002]
§ 175.113 Launchers.
(a) When a visual distress signal carried to meet the requirements of § 175.110 requires a launcher to activate, then a launcher approved under 46 CFR 160.028 must also be carried.
§ 175.115 Exceptions.
The following persons need not comply with § 175.110; however, each must carry on board visual distress signals suitable for night use, selected from the list in § 175.130 or § 175.135, in the number required, between sunset and sunrise:
(a) A person competing in any organized marine parade, regatta, race, or similar event;
(b) A person using a manually propelled boat; or
(c) A person using a sailboat of completely open construction, not equipped with propulsion machinery, under 26′ in length.
§ 175.120 Stowage.
No person may use a boat unless the visual distress signals required by § 175.110 are readily accessible.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996, as amended by USCG-1999-5832, 64 FR 34715, June 29, 1999]
§ 175.125 Serviceability.
No person may use a boat unless each signal required by § 175.110 is in serviceable condition and the service life of the signal, if indicated by a date marked on the signal, has not expired.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996, as amended by USCG-1999-5832, 64 FR 34715, June 29, 1999]
§ 175.128 Marking.
No person may use a boat unless each signal required by § 175.110 is legibly marked with the approval number or certification statement as specified in 46 CFR parts 160 and 161.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996, as amended by USCG-1999-5832, 64 FR 34715, June 29, 1999]
§ 175.130 Visual distress signals accepted.
(a) Any of the following signals, when carried in the number required, can be used to meet the requirements of § 175.110:
(1) An electric distress light meeting the standards of 46 CFR 161.013. One is required to meet the night only requirement.
(2) An orange flag meeting the standards of 46 CFR 160.072. One is required to meet the day only requirement.
(3) Pyrotechnics meeting the standards noted in Table 175.130.
(b) Any combination of signal devices selected from the types noted in paragraphs (a) (1), (2) and (3) of this section, when carried in the number required, may be used to meet both day and night requirements. Examples—the combination of two hand held red flares (160.021), and one parachute red flare (160.024 or 160.036) meets both day and night requirements. Three hand held orange smoke (160.037) with one electric distress light (161.013) meet both day and night requirements.
Table 175.130—Pyrotechnic Signal Devices
Approval number under 46 CFR | Device description | Meets requirement for | Number required
160.021 | Hand Held Red Flare Distress Signals 3 | Day and Night | 3
160.022 | Floating Orange Smoke Distress Signals | Day Only | 3
160.024 | Parachute Red Flare Distress Signals | Day and Night 1 | 3
160.036 | Hand-Held Rocket-Propelled Parachute Red Flare Distress Signals | Day and Night | 3
160.037 | Hand-Held Orange Smoke Distress Signals | Day Only | 3
160.057 | Floating Orange Smoke Distress Signals | Day Only | 3
160.066 | Distress Signal for Boats, Red Aerial Pyrotechnic Flare | Day and Night 2 | 3
1 These signals require use in combination with a suitable launching device approved under 46 CFR 160.028.
2 These devices may be either meteor or parachute assisted type. Some of these signals may require use in combination with a suitable launching device approved under 46 CFR 160.028.
3 Must have manufacture date of 1 Oct. 1980 or later.
[CGD 81-038-A, 47 FR 24548, June 7, 1982]
§ 175.135 Existing equipment.
Launchers manufactured before 1 January, 1981, which do not have approval numbers are acceptable for use with meteor or parachute signals listed in Table 175.130 under § 175.130 as long as they remain in serviceable condition.
[CGD 76-183, 44 FR 73024, Dec. 17, 1979, as amended by CGD 81-038-A, 47 FR 24548, June 7, 1982; USCG-1998-3799, 63 FR 35534, June 30, 1998]
§ 175.140 Prohibited use.
No person in a boat shall display a visual distress signal on waters to which this subpart applies under any circumstance except a situation where assistance is needed because of immediate or potential danger to the persons on board.
Subpart D Ventilation
§ 175.201 Ventilation.
No person may operate a boat built after July 31, 1980, that has a gasoline engine for electrical generation, mechanical power, or propulsion unless it is equipped with an operable ventilation system that meets the requirements of 33 CFR 183.610 (a), (b), (d), (e), and (f) and 183.620(a).
[CGD 76-082, 44 FR 73027, Dec. 17, 1979]
Subpart E Fire Protection Equipment
Source: USCG-2018-0099, 86 FR 58571, Oct. 22, 2021, unless otherwise noted.
§ 175.301 Applicability.
(a) This subpart applies to recreational vessels that are propelled or controlled by propulsion machinery.
(b) Recreational vessels constructed prior to August 22, 2016, will be deemed built before model year 2017 and must meet the requirements of 33 CFR 175.380.
(c) Recreational vessels constructed prior to November 19, 1952, will be deemed built before model year 1953 and must meet the requirements of 33 CFR 175.390.
§ 175.305 General provisions.
Where fire extinguishing equipment in this subpart is required to be of an approved type, such equipment must be approved as provided in 46 CFR chapter I, subchapter Q. A listing of current and formerly approved equipment and materials may be found on the internet at: https://cgmix.uscg.mil/equipment. Each OCMI may be contacted for information concerning approved equipment.
§ 175.310 Portable fire extinguishers and semi-portable fire extinguishing systems.
(a) All portable and semi-portable fire extinguishers must—
(1) Be on board and readily accessible;
(2) Be of an approved type;
(3) Not be expired or appear to have been previously used; and
(4) Be maintained in good and serviceable working condition, meaning:
(i) If the extinguisher has a pressure gauge reading or indicator it must be in the operable range or position;
(ii) The lock pin is firmly in place;
(iii) The discharge nozzle is clean and free of obstruction; and
(iv) The extinguisher does not show visible signs of significant corrosion or damage.
(b) Vaporizing-liquid type fire extinguishers containing carbon tetrachloride, chlorobromomethane, or other toxic vaporizing liquids, are not acceptable as equipment required by this subpart.
(c) Portable or semi-portable extinguishers that are required by their name plates to be protected from freezing must not be located where freezing temperatures may be expected.
(d) The use of dry chemical stored pressure fire extinguishers not fitted with pressure gauges or indicating devices, manufactured prior to January 1, 1965, is permitted on board recreational vessels if such extinguishers are maintained in good and serviceable condition. The following maintenance and inspections are required for such extinguishers:
(1) When the date on the inspection record tag on the extinguishers shows that 6 months have elapsed since the last weight check ashore, then such extinguishers are no longer accepted as meeting required maintenance conditions until they are reweighed ashore, found to be in a serviceable condition, and within required weight conditions.
(2) If the weight of the container is 1/4 ounce less than that stamped on the container, it must be serviced.
(3) If the outer seal or seals (which indicate tampering or use when broken) are not intact, the boarding officer or marine inspector will inspect such extinguishers to see that the frangible disc in the neck of the container is intact; and, if such disc is not intact, the container must be serviced.
(4) If there is evidence of damage, use, or leakage, such as dry chemical powder observed in the nozzle or elsewhere on the extinguisher, the extinguisher must be serviced or replaced.
(e) Dry chemical extinguishers, stored pressure extinguishers, and fire extinguishers without pressure gauges or indicating devices, manufactured after January 1, 1965, cannot be labeled with the marine type label described in 46 CFR 162.028-4. These extinguishers may be carried onboard recreational vessels as excess equipment, subject to paragraphs (a) and (b) of this section.
(f) Semi-portable extinguishers must be fitted with a suitable hose and nozzle, or other practicable means, so that all portions of the space concerned may be covered.
§ 175.315 Fixed fire extinguishing systems.
(a) A fixed fire extinguishing system must be of a type approved by the Coast Guard under 46 CFR part 162.
(b) A carbon dioxide system must be designed and installed in accordance with 46 CFR part 76, subpart 76.15.
(c) An automatic sprinkler system must be designed and installed in accordance with 46 CFR 25.30-15(c).
§ 175.320 Fire extinguishing equipment required.
(a) Recreational vessels 65 feet or less in length. (1) A recreational vessel 65 feet or less in length must carry at least the minimum number of portable fire extinguishers set forth in table 1 to § 175.320(a)(1). A vessel less than 26 feet in length, propelled by an outboard motor, is not required to carry portable fire extinguishers if the construction of the vessel will not permit the entrapment of explosive or flammable gases or vapors.
Table 1 to § 175.320(a)(1)
Length (feet) | Minimum number of 5-B portable fire extinguishers required 1
If no fixed fire extinguishing system in machinery space | If fixed fire extinguishing system in machinery space
Under 16 | 1 | 0
16 or more, but less than 26 | 1 | 0
26 or more, but less than 40 | 2 | 1
40 or more, but not more than 65 | 3 | 2
1 One 20-B portable fire extinguisher may be substituted for two 5-B portable fire extinguishers.
(2) Figure 1 to § 175.320(a)(2) illustrates the conditions, identified by table 2 to § 175.320(a)(2), under which fire extinguishers are required to be carried on board. Figure 2 to § 175.320(a)(2) illustrates conditions, identified by table 3 to § 175.320(a)(2), that do not, in themselves, require that fire extinguishers be carried.
Table 2 to § 175.320(a)(2)
Location identified in Figure 1 to § 175.320(a)(2) | Condition requiring fire extinguishers
1 | Closed compartment under thwarts and seats wherein portable fuel tanks may be stored.
2 | Double bottoms not sealed to the hull or which are not completely filled with flotation material.
3 | Closed living spaces.
4 | Closed stowage compartments in which combustible or flammable materials are stowed.
5 | Permanently installed fuel tanks.
Table 3 to § 175.320(a)(2)
Location identified in Figure 2 to § 175.320(a)(2) | Conditions that do not in themselves require fire extinguishers
1 | Bait wells.
2 | Glove compartments.
3 | Buoyant flotation material.
4 | Open slatted flooring.
5 | Ice chests.
(b) Recreational vessels more than 65 feet in length. (1) A recreational vessel more than 65 feet in length must carry at least the minimum number of portable fire extinguishers specified for its tonnage as set forth in table 4 to § 175.320(b)(1).
Table 4 to § 175.320(b)(1)
Gross tonnage— | Minimum number of 20-B portable fire extinguishers
More than | Not more than
50 | 1
50 | 100 | 2
100 | 500 | 3
500 | 1,000 | 6
1,000 | 8
(2) In addition to the portable fire extinguishers required by table 4 to § 175.320(b)(1), the following fire extinguishing equipment must be fitted in the machinery space:
(i) One 20-B fire extinguisher must be carried for each 1,000 brake horsepower of the main engines or fraction. However, not more than six such extinguishers are required to be carried.
(ii) On recreational vessels of more than 300 gross tons, either one 160-B semi-portable fire extinguishing system must be fitted, or alternatively, a fixed fire extinguishing system must be fitted in the machinery space.
(3) The frame or support of each 160-B semi-portable fire extinguisher required by paragraph (b)(2)(ii) of this section must be welded or otherwise permanently attached to a bulkhead or deck.
(4) If an approved semi-portable fire extinguisher has wheels, it must be securely stowed when not in use to prevent it from rolling out of control under heavy sea conditions.
(c) Extinguishers with larger numerical ratings or multiple letter designations. Extinguishers with larger numerical ratings or multiple letter designations may be used to meet the requirements of table 1 to § 175.320(a)(1) and table 4 to § 175.320(b)(1).
USCG-2018-0099, 86 FR 58571, Oct. 22, 2021, as amended at 86 FR 59303, Oct. 27, 2021]
§ 175.380 Condition and number of fire extinguishers required for recreational vessels built model year 2017 or earlier.
Recreational vessels with a model year between 1953 and 2017 must meet the following requirements:
(a) Previously installed extinguishers with extinguishing capacities that are less than what is required in table 1 to § 175.320(a)(1) or Table 4 to § 175.320(b)(1) need not be replaced but must be maintained in good condition.
(b) All extinguishers installed after August 22, 2016, must meet the applicable requirements in §§ 175.305 through 175.320.
[USCG-2018-0099, 86 FR 58571, Oct. 22, 2021, as amended at Docket No. USCG-2023-0759, 89 FR 22948, Apr. 3, 2024]
§ 175.390 Condition and number of fire extinguishers required for recreational vessels built before model year 1953.
A recreational vessel built before model year 1953 must meet the applicable number and general type of equipment provisions of §§ 175.305 through 175.320. Existing items of equipment and installations previously approved but not meeting the applicable requirements for type approval may be continued in service provided they are in good condition. All new installations and replacements must meet the requirements of §§ 175.305 through 175.320.
PART 177 CORRECTION OF ESPECIALLY HAZARDOUS CONDITIONS
Authority: 46 U.S.C. 4302, 4308, 4311; Pub. L. 103-206, 107 Stat. 2439.
Source: CGD 72-71R, 37 FR 13347, July 7, 1972, unless otherwise noted.
§ 177.01 Purpose and applicability.
This part prescribes rules to implement section 4308 of Title 46 United States Code which governs the correction of especially hazardous conditions on recreational vessels and uninspected passenger vessels on waters subject to the jurisdiction of the United States and, for a vessel owned in the United States, on the high seas, except operators of:
(a) Foreign boats temporarily using waters subject to United States jurisdiction;
(b) Military or public boats of the United States, except recreational-type public boats;
(c) A boat whose owner is a State or subdivision thereof, which is used principally for governmental purposes and which is clearly identifiable as such;
(d) Ship's lifeboats.
[CGD 72-71R, 37 FR 13347, July 7, 1972, as amended by CGD 84-099, 52 FR 47534, Dec. 14, 1987; CGD 84-099, 53 FR 13117, Apr. 21, 1988]
§ 177.03 Definitions.
As used in this part:
(a) [Reserved]
(b) Boat means any vessel—
(1) Manufactured or used primarily for noncommercial use;
(2) Leased, rented, or chartered to another for the latter's noncommercial use; or
(3) Operated as an uninspected passenger vessel subject to the requirements of 46 CFR chapter I, subchapter C.
(c) Coast Guard Boarding Officer means a commissioned, warrant, or petty officer of the Coast Guard having authority to board any vessel under the Act of August 4, 1949, 63 Stat. 502, as amended (14 U.S.C. 522).
(d) Operator means the person who is in control or in charge of a boat while it is in use.
(e) Use means operate, navigate, or employ.
(f) Vessel includes every description of watercraft, other than a seaplane on the water, used or capable of being used as a means of transportation on the water.
[CGD 72-71R, 37 FR 13347, July 7, 1972, as amended by CDG 84-099, 52 FR 47534, Dec. 14, 1987; USCG-1999-5040, 67 FR 34760, May 15, 2002; USCG-2020-0304, 85 FR 58281, Sept. 18, 2020]
§ 177.04 Order of unsafe condition.
(a) The Commandant has redelegated to Coast Guard District Commanders, with the reservation that this authority shall not be further redelegated, the authority, under 46 U.S.C. 4308, to issue orders applicable to a specific boat within the District Commander's jurisdiction designating that boat unsafe for a specific voyage on a specific body of water when it is determined, under the provisions of § 177.07(f), that an unsafe condition exists.
(b) Each order issued by a Coast Guard District Commander under the provisions of paragraph (a) of this section will contain:
(1) Notice that the person upon whom the order is served has the right under the Administrative Procedure Act (5 U.S.C. 553(e)), to petition for reconsideration and repeal of the order;
(2) Full title and address of the Coast Guard District Commander to whom the petition is to be submitted; and
(3) Notice that the petition should contain:
(i) The text or substance of the order which the petitioner seeks to have reconsidered and repealed;
(ii) A statement of the action sought by the petitioner;
(iii) Whatever arguments or data that are available to the petitioner to support the action sought; and
(iv) An advisement that if the petitioner desires reconsideration and repeal of the rule before a specific date, the petition should so state and give reasons why action by that date is necessary.
(c) If a Coast Guard District Commander determines that a petition submitted under the provisions of paragraph (b) of this section contains adequate justification, the District Commander will initiate prompt action to repeal the order. If the District Commander determines that repeal of the order is not justified, the District Commander will issue prompt written notice of denial to the petitioner.
[CGD 95-057, 60 FR 34150, June 30, 1995, as amended by USCG-2013-0216, 78 FR 40966, July 9, 2013]
§ 177.05 Action to correct an especially hazardous condition.
An operator of a boat who is directed by a Coast Guard Boarding Officer to take immediate and reasonable steps necessary for the safety of those aboard the vessel, under section 4308 of Title 46, United States Code, shall follow the direction of the Coast Guard Boarding Officer, which may include direction to:
(a) Correct the especially hazardous condition immediately;
(b) Proceed to a mooring, dock, or anchorage; or
(c) Suspend further use of the boat until the especially hazardous condition is corrected.
[CGD 72-71R, 37 FR 13347, July 7, 1972, as amended by CDG 84-099, 52 FR 47534, Dec. 14, 1987]
§ 177.07 Other unsafe conditions.
For the purpose of section 4308 of Title 46, United States Code, “other unsafe condition” means a boat:
(a) Does not display between sunset and sunrise the navigation lights prescribed by the International Regulations for Preventing Collisions at Sea, 1972 (72 COLREGS) or, when in use upon the inland waters of the United States, the Inland Navigational Rules Act of 1980 (Pub. L. 96-591), 94 Stat. 3415, 33 U.S.C. 2001, et seq.);
(b) That is operated by an individual who is apparently under the influence of alcohol or a dangerous drug, as defined in § 95.020 of this chapter, to the extent that, in the boarding officer's discretion, the continued operation of the vessel would create an unsafe condition.
(c) Has a fuel leakage from either the fuel system or engine, or has an accumulation of fuel in the bilges.
(d) Does not meet the applicable ventilation requirements for tanks and engine spaces prescribed by 46 CFR 25.40 (which applies to certain boats built before August 1, 1980), or Subpart K Ventilation, of 33 CFR part 183 (which applies to boats built after July 31, 1980);
(e) Does not meet the requirements for backfire flame control prescribed by 46 CFR 25.35; or
(f) Designated manifestly unsafe for a specific voyage on a specific body of water due to:
(1) Unsuitable design or configuration, or
(2) Improper construction or inadequate material condition, or
(3) Improper or inadequate operational or safety equipment, and set forth in an order issued by a District Commander according to the provisions of § 177.04.
[CGD 72-71R, 37 FR 13347, July 7, 1972]
Editorial Note:For Federal Register citations affecting § 177.07, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 177.08 Penalties.
An operator of a vessel who does not follow the directions of a Coast Guard Boarding Officer prescribed in § 177.05 is, in addition to any other penalty prescribed by law, subject to—
(a) The criminal penalties of 46 U.S.C. 4311, which provides that a person willfully operating a recreational vessel in violation of 46 U.S.C., Chapter 43 or regulations issued thereunder, shall be fined not more than $5,000, imprisoned for not more than one year, or both.
(b)(1) The civil penalties for violating 46 U.S.C. 4307(a)(1).
(2) The civil penalties of 46 U.S.C. 4311, which provides that a person violating any other provision of 46 U.S.C., Chapter 43 or regulation issued thereunder is liable to the United States Government for a civil penalty, and, if the violation involves the operation of a vessel, the vessel is liable in rem for the penalty.
[CGD 96-052, 62 FR 16703, Apr. 8, 1997, as amended by USCG-2012-0306, 77 FR 37316, June 21, 2012. Redesignated by USCG-2013-0216, 78 FR 40966, July 9, 2013]
PART 179 DEFECT NOTIFICATION
Authority: 43 U.S.C. 1333; 46 U.S.C. 4302, 4307, 4310, and 4311; Pub. L. 103-206, 107 Stat. 2439; 49 CFR 1.46.
Source: CGD 72-55R, 37 FR 15776, Aug. 4, 1972, unless otherwise noted.
§ 179.01 Purpose.
This part prescribes rules to implement 46 U.S.C. 4310, governing the notification of defects in boats and associated equipment.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.03 Definitions.
Associated equipment as used in this part, means the following equipment as shipped, transferred, or sold from the place of manufacture and includes all attached parts and accessories:
(1) An inboard engine.
(2) An outboard engine.
(3) A stern drive unit.
(4) An inflatable personal flotation device approved under 46 CFR 160.076.
Boat means any vessel—
(1) Manufactured or used primarily for noncommercial use;
(2) Leased, rented, or chartered to another for the latter's noncommercial use; or
(3) Operated as an uninspected passenger vessel subject to the requirements of 46 CFR chapter I, subchapter C.
Manufacturer means any person engaged in—
(1) The manufacture, construction, or assembly of boats or associated equipment;
(2) The manufacture or construction of components for boats and associated equipment to be sold for subsequent assembly; or
(3) The importation into the United States for sale of boats, associated equipment, or components thereof.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999; USCG-1999-5040, 67 FR 34760, May 15, 2002]
§ 179.05 Manufacturer discovered defects.
Each manufacturer who is required to furnish a notice of a defect or failure to comply with a standard or regulation under 46 U.S.C. 4310(b), shall furnish that notice within 30 days after the manufacturer discovers or acquires information of the defect or failure to comply.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.07 Notice given by “more expeditious means”.
Each manufacturer who gives notice by more expeditious means as provided for in 46 U.S.C. 4310(c)(1)(C), must give such notice in writing.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.09 Contents of notification.
Each notice required under 46 U.S.C. 4310(b) must include the following additional information:
(a) The name and address of the manufacturer.
(b) Identifying classifications including the make, model year, if appropriate, the inclusive dates (month and year) of the manufacture, or serial numbers and any other data necessary to describe the boats or associated equipment that may be affected.
[CGD 72-55R, 37 FR 15776, Aug. 4, 1972, as amended by CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.11 Defects determined by the Commandant.
A manufacturer who is informed by the Commandant under 46 U.S.C. 4310(f) that a boat or associated equipment contains a defect relating to safety or failure to comply with a standard or regulation issued under the authority of 46 U.S.C. 4302, shall within 30 days of receipt of the information—
(a) Furnish the notification described in 46 U.S.C. 4310(d) to the persons designated in 46 U.S.C. 4310(c), or
(b) Provide information to the Commandant by certified mail stating why the manufacturer believes there is no defect relating to safety or failure of compliance.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.13 Initial report to the Commandant.
(a) When a manufacturer gives a notification required under 46 U.S.C. 4310, the manufacturer shall concurrently send to the Commandant by certified mail—
(1) A true or representative copy of each notice, bulletin, and other communication given to persons required to be notified under 46 U.S.C. 4310(c);
(2) The manufacturer's best estimate of the total number of boats or items of associated equipment potentially affected by the defect or failure to comply with a standard or regulation prescribed under 46 U.S.C. 4302; and
(3) If discovered or determined by the manufacturer, a chronology of all principal events upon which the determination is based.
(b) A manufacturer may submit an item required by paragraph (a) of this section that is not available at the time of submission to the Commandant when it becomes available if the manufacturer explains why it was not submitted within the time required and estimates when it will become available.
[CGD 72-55R, 37 FR 15776, Aug. 4, 1972, as amended by CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.15 Follow-up report.
(a) Each manufacturer who makes an initial report required by § 179.13 shall submit a follow-up report to the Commandant by certified mail within 60 days after the initial report. The follow-up report must contain at least the following information:
(1) A positive identification of the initial report;
(2) The number of units in which the defect was discovered as of the date of the follow-up report;
(3) The number of units in which corrective action has been completed as of the date of the follow-up report;
(4) The number of first purchasers not notified because of an out-of-date name or address, or both; and
(5) An updating of the information required by § 179.13.
(b) Each manufacturer shall submit any additional follow-up reports requested by the Commandant.
§ 179.17 Penalties.
Each manufacturer who fails to comply with a provision of 46 U.S.C. 4310 or the regulations in this part, is subject to the penalties as prescribed in 46 U.S.C. 4311.
[CGD 93-055, 61 FR 13926, Mar. 28, 1996]
§ 179.19 Address of the Commandant.
(a) Each report and communication sent to the Coast Guard and required by this part concerning boats and associated equipment other than inflatable personal flotation devices, must be submitted to Commandant (CG-BSX-23), Attn: Recreational Boating Product Assurance Branch, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501.
(b) Each report and communication sent to the Coast Guard and required by this part concerning inflatable personal flotation devices, must be submitted to Commandant (CG-ENG-4), Attn: Lifesaving and Fire Safety Division, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509.
[CGD 93-055, 61 FR 13927, Mar. 28, 1996; CGD 96-026, 61 FR 36629, July 12, 1996; USCG-2008-0179, 73 FR 35024, June 19, 2008; USCG-2010-0351, 75 FR 36287, June 25, 2010; USCG-2014-0410, 79 FR 38448, July 7, 2014]
PART 181 MANUFACTURER REQUIREMENTS
Authority: 46 U.S.C. 4302; DHS Delegation 00170.1, Revision No. 01.4.
Source: CGD 72-60, 37 FR 15779, Aug. 4, 1972, unless otherwise noted.
Subpart A General
§ 181.1 Purpose and applicability; preemptive effect.
This part prescribes requirements for the certification of boats and associated equipment and identification of boats to which 46 U.S.C. chapter 43 applies. The regulations in this part have the preemptive effect described in 46 U.S.C. 4306.
[USCG-2003-14963, 77 FR 18703, Mar. 28, 2012]
§ 181.3 Definitions.
As used in this part:
Associated equipment means:
(1) Any system, part, or component of a boat as originally manufactured or any similar part or component manufactured or sold for replacement, repair, or improvement of such system, part, or component;
(2) Any accessory or equipment for, or appurtenance to, a boat; and
(3) Any marine safety article, accessory, or equipment intended for use by a person on board a boat; but
(4) Excluding radio equipment.
Boat means any vessel—
(1) Manufactured or used primarily for noncommercial use;
(2) Leased, rented, or chartered to another for the latter's noncommercial use; or
(3) Operated as an uninspected passenger vessel subject to the requirements of 46 CFR chapter I, subchapter C.
Date of certification means the date on which a boat or item of associated equipment is certified to comply with all applicable U.S. Coast Guard safety standards in effect on that date.
Date of manufacture means the month and year during which construction or assembly of a boat or item of associated equipment begins.
Manufacturer means any person engaged in—
(1) The manufacture, construction, or assembly of boats or associated equipment; or
(2) The importation of boats, associated equipment, or the components thereof, into the United States for sale.
Private label merchandiser means any person engaged in the business of selling and distributing, under his own trade name, boats, or items of associated equipment manufactured by another.
State means a State of the United States, Guam, the Commonwealth of Puerto Rico, the Virgin Islands, American Samoa, the District of Columbia, the Commonwealth of the Northern Mariana Islands, and any other territory or possession of the United States.
[CGD 96-026, 61 FR 33669, June 28, 1996; 61 FR 36786, July 12, 1996, as amended by USCG-1999;-5040, May 15, 2002; USCG-2003-14963, 77 FR 18703, Mar. 28, 2012; USCG-2016-0498, 82 FR 35089, July 28, 2017]
§ 181.4 [Reserved]
Subpart B Manufacturer Certification of Compliance
§ 181.5 Purpose and applicability.
This subpart prescribes requirements for the certification of boats and associated equipment to which 46 U.S.C. Chapter 43 applies and to which a safety standard prescribed in Part 183 of this chapter applies.
[CGD 85-002, 51 FR 37573, Oct. 23, 1986]
§ 181.7 Compliance certification label required.
Unless there is affixed to it a certification label that contains the information required by § 181.15:
(a) No person who manufactures, constructs, or assembles a boat or associated equipment may deliver that boat or equipment for the purpose of sale;
(b) No person may import into the United States any boat or associated equipment; and
(c) No person engaged in the business of selling or distributing boats or associated equipment may sell or offer for sale any boat or associated equipment.
§ 181.9 Affixing labels.
(a) Each manufacturer of a boat or item of associated equipment to which a standard or regulation prescribed in Part 183 of this chapter applies shall affix a certification label that contains the information required by § 181.15 to that boat or equipment before it:
(1) Leaves the place of manufacture for the purpose of sale; or
(2) Is imported.
(b) The manufacturer of a boat or item of associated equipment that is sold to a private label merchandiser may, at the option of the private label merchandiser, affix a certification label identifying the private label merchandiser as the manufacturer before the boat or item of associated equipment leaves the place of manufacture.
§ 181.11 Exceptions to labeling requirement.
(a) This part does not apply to boats or associated equipment intended solely for export, and so labeled, tagged, or marked on the boat or equipment and on the outside of the container, if any, which is exported.
(b) If an item of associated equipment is so small that a certification label that meets the requirements in § 181.15 cannot be affixed to it, a certification label that contains the information required by § 181.15 may be printed on the smallest container in which the item is packed or on a slip packed with the item.
(c) This subpart does not apply to any outboard motor or starting control to which § 183.710 of this chapter applies.
[CGD 72-60, 37 FR 15779, Aug. 4, 1972, as amended by CGD 79-137, 46 FR 3515, Jan. 15, 1981; 46 FR 9579, Jan. 29, 1981]
§ 181.13 Removal of labels.
No person may remove a label required by this part or remove or alter any information on a label required by this part, unless authorized by the Commandant.
§ 181.15 Contents of labels.
(a) Each label required by § 181.7 must contain:
(1) The name and address of the manufacturer or private label merchandiser who certifies that the boat or item of associated equipment complies with the standards prescribed in part 183 of this subchapter; and
(2) Except as provided in paragraph (c) of this section, the words:
(i) “This (insert ‘Boat’ or ‘Equipment’) Complies With U.S. Coast Guard Safety Standards In Effect On (insert date of certification as prescribed in paragraph (b) of this section)”; or
(ii) If the item being certified is a boat, the label may show the words, “This Boat Complies With U.S. Coast Guard Safety Standards In Effect On The Date of Certification.”
(b) Date of certification must be no earlier than the date on which construction or assembly began and no later than the date on which the boat or item of associated equipment leaves the place of manufacture or assembly or import for the purposes of sale.
(c) [Reserved]
(d) Except as provided in paragraph (e) of this section, the manufacturer may, in addition to the information required by paragraphs (a) and (b) of this section, display on the certification label any or all of the following information:
(1) Model name or designation.
(2) Hull identification number (if a boat) or serial number (if an item of associated equipment).
(3) Model year.
(e) Display of the hull identification number on the certification label does not satisfy the display requirements of § 181.29.
(f) Each boat which displays a maximum horsepower capacity determined in accordance with § 183.53(b) must, in addition to the information required by paragraphs (a), (b) and (d) of this section, display on the certification label, the following statement in letters no less than one-quarter of an inch in height:
THIS BOAT IS INTENDED FOR RACING AND OTHER HIGH PERFORMANCE ACTIVITIES. THE SKILL REQUIRED MAY EXCEED THE ABILITIES OF SOME OPERATORS.
[CGD 72-60, 37 FR 15779, Aug. 4, 1972, as amended by CGD 83-012, 49 FR 39327, Oct. 5, 1984; CGD 85-002, 51 FR 37573, Oct. 23, 1986; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 181.17 Label numbers and letters.
Letters and numbers on each label must:
(a) Be no less than one-eighth of an inch in height; and
(b) Contrast with the basic color of the label, except that the date of certification may be permanently stamped, engraved, or embossed on the label.
§ 181.19 Construction of labels.
(a) Each label must be made of material that can withstand exposure to water, oil, salt spray, direct sunlight, heat, cold, and wear expected in normal use of the boat or item of associated equipment without deterioration of legibility.
(b) Each label must be made of material that shows visible traces of the alteration or removal of information on the label.
Subpart C Identification of Boats
Source: CGD 79-013, 48 FR 40718, Sept. 9, 1983, unless otherwise noted.
§ 181.21 Purpose, applicability and effective dates.
This subpart prescribes the requirements for identification of boats to which section 46 U.S.C. 4301 applies.
[CGD 79-013, 48 FR 40718, Sept. 9, 1983, as amended by USCG-1998-3799, 63 FR 35534, June 30, 1998; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 181.23 Hull identification numbers required.
(a) A manufacturer must identify each boat produced or imported with primary and secondary hull identification numbers permanently affixed in accordance with § 181.29 of this subpart.
(b) A person who manufactures or imports a boat for his or her own use and not for sale must obtain the required hull identification number in accordance with the requirements of the issuing authority listed in 33 CFR part 173, appendix A for the boat's State of principal operation and permanently affix the HIN to the boat in accordance with § 181.29 of this subpart.
(c) No person may assign the same HIN to more than one boat.
[USCG-2003-14963, 77 FR 18703, Mar. 28, 2012]
§ 181.25 Hull identification number format.
Each of the hull identification numbers required by § 181.23 must consist of twelve characters, uninterrupted by slashes, hyphens, or spaces, as follows:
(a) The first three characters must be a manufacturer identification code assigned under § 181.31(a) or the importer designation assigned under § 181.31(b).
(b) Characters four through eight must be a serial number assigned by the manufacturer in letters of the English alphabet, or Arabic numerals, or both, except the letters I, O, and Q.
(c) Characters nine and ten must indicate the month and year of certification when a date of certification is required. In all other cases characters nine and ten must indicate the date of manufacture. The date indicated can be no earlier than the date construction or assembly began and no later than the date the boat leaves the place of manufacture or assembly or is imported into the United States for the purposes of sale. Character nine must be indicated using letters of the English alphabet. The first month of the year, January, must be designated by the letter “A”, the second month, February, by the letter “B”, and so on until the last month of the year, December. Character ten must be the last digit of the year of manufacture or certification and must be an Arabic numeral.
(d) Characters eleven and twelve must indicate the model year using Arabic numerals for the last two numbers of the model year such as “82” for 1982 and “83” for 1983.
§ 181.27 Information displayed near hull identification number.
With the exception of the characters “US-”, which constitute the country of origin code for the United States, if information is displayed on the boat within 2 inches of the 12-character hull identification number (HIN), that information must be separated from the HIN by means of borders or must be on a separate label, so that it will not be interpreted as part of the hull identification number.
[USCG-2003-14272, 69 FR 33860, June 17, 2004]
§ 181.29 Hull identification number display.
Two identical hull identification numbers are required to be displayed on each boat hull.
(a) The primary hull identification number must be affixed—
(1) On boats with transoms, to the starboard outboard side of the transom within two inches of the top of the transom, gunwale, or hull/deck joint, whichever is lowest.
(2) On boats without transoms or on boats on which it would be impractical to use the transom, to the starboard outboard side of the hull, aft, within one foot of the stern and within two inches of the top of the hull side, gunwale or hull/deck joint, whichever is lowest.
(3) On catamarans and pontoon boats which have readily replaceable hulls, to the aft crossbeam within one foot of the starboard hull attachment.
(4) If the hull identification number would not be visible, because of rails, fittings, or other accessories, the number must be affixed as near as possible to the location specified in paragraph (a) of this section.
(b) The duplicate hull identification number must be affixed in an unexposed location on the interior of the boat or beneath a fitting or item of hardware.
(c) Each hull identification number must be carved, burned, stamped, embossed, molded, bonded, or otherwise permanently affixed to the boat so that alteration, removal, or replacement would be obvious. If the number is on a separate plate, the plate must be fastened in such a manner that its removal would normally cause some scarring of or damage to the surrounding hull area. A hull identification number must not be attached to parts of the boat that are removable.
(d) The characters of each hull identification number must be no less than one-fourth of an inch high.
[CGD 79-013, 48 FR 40718, Sept. 19, 1983; 48 FR 53558, Nov. 28, 1983]
§ 181.31 Manufacturer identification code assignment.
(a) Each person required by § 181.23(a) of this part to affix hull identifications numbers must request a manufacturer identification code in writing from the Commandant (CG-BSX-23), Attn: Recreational Boating Product Assurance Branch, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501. The request must indicate the manufacturer's name and U.S. address along with the general types and lengths of boats that will be manufactured.
(b) For boats manufactured outside of the jurisdiction of the United States, a U.S. importer must obtain a manufacturer identification code as required by paragraph (a) of this section. The request must indicate the importer's name and U.S. address along with a list of the manufacturers, their addresses, and the general types and sizes of boats that will be imported. If a nation has a hull identification number system which has been accepted by the Coast Guard for the purpose of importing boats, it may be used by the importer instead of the one specified within this subpart. To request a list of those nations having such a numbering system, write to the Commandant (CG-BSX-23), Attn: Recreational Boating Product Assurance Branch, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501.
[USCG-2003-14963, 77 FR 18703, Mar. 28, 2012, as amended by USCG-2014-0410, 79 FR 38449, July 7, 2014]
§ 181.33 Conditions for use of manufacturer identification codes.
(a) No manufacturer or importer may sell or transfer a manufacturer identification code or use a manufacturer identification code that has been assigned to another.
(b) A manufacturer or importer who changes the business name or address must advise the Commandant (CG-BSX-23), Attn: Recreational Boating Product Assurance Branch, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501 of the change in writing.
[CGD 79-013, 48 FR 40718, Sept. 9, 1983, as amended by CGD 88-052, 53 FR 25122, July 1, 1988; CGD 96-026, 61 FR 33669, June 28, 1996; USCG-2008-0179, 73 FR 35024, June 19, 2008; USCG-2010-0351, 75 FR 36287, June 25, 2010; USCG-2014-0410, 79 FR 38449, July 7, 2014]
§ 181.35 Removal of numbers.
No person may remove or alter a number required by this subpart unless authorized by the Commandant, U.S. Coast Guard.
D Subparts D-F [Reserved]
Subpart G Information Pamphlet or Placard for Personal Flotation Devices
Source: CGD 75-008a, 43 FR 9767, Mar. 9, 1978, unless otherwise noted.
§ 181.701 Applicability.
This subpart applies to all Coast Guard approved personal flotation devices that are sold or offered for sale for use on recreational boats.
[CGD 75-008a, 43 FR 9767, Mar. 9, 1978, as amended by USCG-2022-0120, 89 FR 97386, Dec. 6, 2024]
§ 181.702 Information pamphlet or placard: requirement to furnish.
(a) Each manufacturer of a Coast Guard approved personal flotation device (PFD) must furnish, with each PFD that is sold or offered for sale for use on a recreational boat, an information pamphlet or placard accepted by the Commandant (CG-ENG-4) or meeting the requirements in the applicable subpart of 46 CFR part 160.
(b) No person may sell or offer for sale for use on a recreational boat a Coast Guard approved PFD unless an information pamphlet or placard required by this section is attached in such a way that it can be read prior to purchase.
[USCG-2022-0120, 89 FR 97386, Dec. 6, 2024]
PART 183 BOATS AND ASSOCIATED EQUIPMENT
Authority: 46 U.S.C. 4302; Pub. L. 103-206, 107 Stat. 2439; and Department of Homeland Security Delegation No. 0170.1, para. II, (92)(b). Subpart E is also authorized by Pub. L. 114-120, 130 Stat. 27
Source: CGD 72-61R, 37 FR 15782, Aug. 4, 1972, unless otherwise noted.
Subpart A General
§ 183.1 Purpose and applicability.
This part prescribes standards and regulations for boats and associated equipment to which 46 U.S.C. Chapter 43 applies and to which certification requirements in Part 181 of this subchapter apply.
[CGD 85-098, 52 FR 19728, May 27, 1987]
§ 183.3 Definitions.
Beam means the transverse distance between the outer sides of the boat excluding handles, and other similar fittings, attachments, and extensions.
Boat means any vessel—
(1) Manufactured or used primarily for noncommercial use;
(2) Leased, rented, or chartered to another for the latter's noncommercial use; or
(3) Operated as an uninspected passenger vessel subject to the requirements of 46 CFR chapter I, subchapter C.
Full transom means a transom with a maximum width which exceeds one-half the maximum beam of the boat.
Length means the straight line horizontal measurement of the overall length from the foremost part of the boat to the aftermost part of the boat, measured from end to end over the deck excluding sheer, and measured parallel to the centerline. Bow sprits, bumpkins, rudders, outboard motor brackets, handles, and other similar fittings, attachments, and extensions are not included in the measurement.
Monohull boat means a boat on which the line of intersection of the water surface and the boat at any operating draft forms a single closed curve. For example, a catamaran, trimaran, or a pontoon boat is not a monohull boat.
Motorwell means any arrangement of bulkheads or structures that prevents water from entering the passenger carrying area of the boat through any cutout area in the transom for mounting an outboard motor.
Motorwell height means the vertical distance from the lowest point of water ingress along the top of the motorwell to a line representing a longitudinal extension of the centerline of the boat's bottom surface, excluding keels. This distance is measured as a projection on the centerline plane of the boat. See Figure 183.3.
Permanent appurtenances means equipment that is mounted or fastened, so that it is not removable without the use of tools. Seats, inboard engines, windshields, helm stations, or hardtops are permanent appurtenances. Outboard motors, controls, batteries, and portable fuel tanks are not permanent appurtenances.
Remote steering means any mechanical assist device which is rigidly attached to the boat and used in steering the vessel, including but not limited to mechanical, hydraulic, or electrical control systems.
Sailboat means a boat designed or intended to use sails as the primary means of propulsion.
Sheer means the topmost line in a boat's side. The sheer intersects the vertical centerline plane of the boat at the forward end and intersects the transom (stern) at the aft end. For the purposes of this definition, the topmost line in a boat's side is the line defined by a series of points of contact with the boat structure, by straight lines at 45 degree angles to the horizontal and contained in a vertical plane normal to the outside edge of the boat as seen from above and which are brought into contact with the outside of the horizontal boat. A boat is horizontal when it is transversely level and when the lowest points at 40 percent and 75 percent of the boat's length behind the most forward point of the boat are level.
Transom means the surface at the stern of a boat projecting or facing aft. The upper boundary of the transom is the line defined by a series of points of contact, with the boat structure, by straight lines at 45 degree angles to the horizontal and contained in a vertical longitudinal plane and which are brought into contact with the stern of the horizontal boat. A boat is horizontal when it is transversely level and when the lowest points at 40 percent and 75 percent of the boat's length behind the most forward point of the boat are level.
Transom height means the vertical distance from the lowest point of water ingress along the top of the transom to a line representing a longitudinal extension of the centerline of the boat's bottom surface, excluding keels. This distance is measured as a projection on the centerline plane of the boat. See Figure 183.3.
Vessel includes every description of watercraft, other than a seaplane on the water, used or capable of being used as a means of transportation on the water.
Figure 183.3—Transom and Motorwell Height
[CGD 73-250, 40 FR 43856, Sept. 23, 1975, as amended by CGD 75-176, 42 FR 2681, Jan. 13, 1977; CGD 85-002, 51 FR 37574, Oct. 23, 1986; CGD 96-026, 61 FR 33669, June 28, 1996; 61 FR 36629, July 12, 1996; USCG-1999-5040, 67 FR 34760, May 15, 2002]
§ 183.5 Incorporation by reference.
(a) Certain materials are incorporated by reference into this part with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a). To enforce any edition other than the one listed in paragraph (b) of this section, notice of change must be published in the Federal Register and the material made available to the public. All approved material is available for inspection at the Coast Guard Headquarters. Contact Commandant (CG-BSX-23), Attn: Recreational Boating Product Assurance Branch, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501. It is also available at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. All approved material is available from the sources listed in paragraph (b) of this section.
(b) The materials approved for incorporation by reference in this part, and the sections affected are:
Air Movement and Control Association, 30 W. University Drive, Arlington Heights, IL 60004:
AMCA 210-74: Laboratory Methods of Testing Fans for Ratings—1974 | § 183.610
American Boat and Yacht Council, Inc., 613 Third Street Suite 10, Annapolis, Maryland 21403:
ABYC A-16 Electric Navigation Lights-1997 | § 183.810
American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959:
ASTM D 471-96, Standard Test Method for Rubber Property—Effect of Liquids | §§ 183.114; 183.516; 183.607; 183.620
ASTM D 1621-94, Standard Test Method for Compressive Properties of Rigid Cellular Plastics | § 183.516
ASTM D 1622-93, Standard Test Method for Apparent Density of Rigid Cellular Plastics | § 183.516
ASTM D 2842-97, Standard Test Method for Water Absorption of Rigid Cellular Plastics | § 183.114
Institute of Electrical and Electronics, Engineers, Inc., 445 Hoes Lane, Piscataway, NJ 08854:
IEEE 45 IEEE Recommended Practice for Electrical Installations on Shipboard—1983. Cable Construction | § 183.435
National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02269:
NFPA No. 70 National Electrical Code—1987. Articles 310 & 400 | § 183.435
Military Specifications and Standards, Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094; https://assist.daps.dla.mil/quicksearch/
MILSPEC-P-21929B Plastic Material, Cellular Polyurethane, Foam-In-Place, Rigid—1970 | § 183.516
Society of Automotive Engineers, Inc., 400 Commonwealth Drive, Warrendale, PA 15096:
SAE J378 Marine Engine Wiring—1984 | § 183.430
SAE J557 High Tension Ignition Cable—1968 | § 183.440
SAE J1127 Battery Cable—1980 | § 183.430
SAE J1128 Low Tension Primary Cable—1975 | § 183.430
SAE J1527DEC85 Marine Fuel Hoses—1985 | § 183.540
Underwriters Laboratories, Inc. (UL), 12 Laboratory Drive, Research Triangle Park, NC 27709-3995:
UL 1114 Marine (USCG Type A) Flexible Fuel Line Hose—1987 | § 183.540
UL 1128 Marine Blowers—1977 | § 183.610
UL 1426 Cables for Boats—1987 | § 183.435
[CGD 87-009, 53 FR 36971, Sept. 23, 1988, as amended by CGD 96-026, 61 FR 33670, June 28, 1996; USCG-1999-5151, 64 FR 67176, Dec. 1, 1999; USCG-2000-7223, 65 FR 40059, June 29, 2000; USCG-1999-6580, 66 FR 55091, Nov. 1, 2001; 69 FR 18803, Apr. 9, 2004; USCG-2004-18057, 69 FR 34926, June 23, 2004; USCG-2008-0179, 73 FR 35024, June 19, 2008; USCG-2010-0351, 75 FR 36288, June 25, 2010; USCG-2014-0410, 79 FR 38449, July 7, 2014]
Subpart B Display of Capacity Information
§ 183.21 Applicability.
This subpart applies to monohull boats less than 20 feet in length, except sailboats, canoes, kayaks, and inflatable boats.
§ 183.23 Capacity marking required.
Each boat must be marked in the manner prescribed in §§ 183.25 and 183.27 with the maximum persons capacity in whole numbers of persons and in pounds, the maximum weight capacity in pounds, determined under §§ 183.33 through 183.43, and the maximum horsepower capacity determined under § 183.53 or the statement “This Boat Not Rated for Propulsion by a Motor”.
[CGD 78-034, 45 FR 2029, Jan. 10, 1980, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.25 Display of markings.
(a) Each marking required by § 183.23 must be permanently displayed in a legible manner where it is clearly visible to the operator when getting the boat underway.
(b) The information required by § 183.23 must be displayed in the following manner:
(1) For outboard boats:
U.S. Coast Guard Maximum Capacities XX Persons or XXX Pounds XXX Pounds, persons, motor, gear XXX Horsepower, motor or U.S. Coast Guard Maximum Capacities XX Persons or XXX Pounds XXX Pounds, persons, motor, gear XXX Horsepower, motor with remote steering XXX Horsepower, motor without remote steering
(2) For inboard boats and inboard-outboard boats:
U.S. Coast Guard Maximum Capacities XX Persons or XXX Pounds XXX Pounds, persons, gear
(3) For boats rated for motors of 2 horsepower or less:
U.S. Coast Guard Maximum Capacities XX Persons or XXX Pounds XXX Pounds, persons, motor, gear XXX Horsepower, motor
(4) For boats rated for manual propulsion:
U.S. Coast Guard Maximum Capacities XX Persons or XXX Pounds XXX Pounds, persons, gear This Boat Not Rated for Propulsion by Motor
(c) The capacity information displays required in paragraph (b) must meet the following as illustrated in Figure 183.25:
(1) The capacity information required in § 183.23 must be displayed within a yellow area that—
(i) Is at least 4 inches wide; and
(ii) Is high enough that each line of print is separated by at least 1/8 inch from each other and from the borders of the yellow area;
(2) The persons capacity in whole numbers must be black print with the following dimensions:
(i) The height must not be smaller than one-half inch;
(ii) The width of the numbers must be three-fifths of the height except for the number “4”, which shall be one stroke width wider, and the number “1”, which shall be one stroke in width;
(iii) The stroke width shall be one-sixth of the height; and
(iv) The minimum space between the numbers shall be one stroke width.
(3) The words in the line “XX Persons or XXX Pounds” must be at least one-quarter inch in height but not larger than one-half the height of the persons capacity number and of a color contrasting with yellow. The number of pounds in this line must be at least one-eighth inch in height but no larger than one-half the height of the persons capacity number and of a color contrasting with yellow.
(4) All remaining words and numbers required to be within the yellow area required in paragraph (c)(1) must be at least one-eighth inch in height, but no larger than one-half the height of the persons capacity number.
(5) All other words and numbers on the displays must be located outside the yellow area on a background color which contrasts with yellow.
(6) The words “Maximum Capacities” must be at least one-quarter inch in height and of color contrasting with its background.
(7) The words “U.S. Coast Guard” must be at least one-eighth inch in height and of color contrasting with its background.
[CGD 78-034, 45 FR 2029, Jan. 10, 1980]
§ 183.27 Construction of markings.
Each marking required by § 183.23 must be—
(a) Capable of withstanding the combined effects of exposure to water, oil, salt spray, direct sunlight, heat, cold, and wear expected in normal operation of the boat, without loss of legibility; and
(b) Resistant to efforts to remove or alter the information without leaving some obvious sign of such efforts.
[CGD 78-034, 45 FR 2030, Jan. 10, 1980]
Subpart C Safe Loading
§ 183.31 Applicability.
This subpart applies to monohull boats less than 20 feet in length except sailboats, canoes, kayaks, and inflatable boats.
§ 183.33 Maximum weight capacity: Inboard and inboard-outdrive boats.
(a) The maximum weight capacity (W) marked on a boat that has one or more inboard or inboard-outdrive units for propulsion must not exceed the greater value of W obtained from either of the following formulas:
(b) For the purposes of paragraph (a) of this section:
(1) “Maximum displacement” is the weight of the volume of water displaced by the boat at its maximum level immersion in calm water without water coming aboard. For the purpose of this paragraph, a boat is level when it is transversely level and when either of the two following conditions are met:
(i) The forward point where the sheer intersects the vertical centerline plane and the aft point where the sheer intersects the upper boundary of the transom (stern) are equidistant above the water surface or are equidistant below the water surface.
(ii) The most forward point of the boat is level with or above the lowest point of water ingress.
(2) “Boat weight” is the combination of:
(i) Hull weight;
(ii) Deck and superstructure weight;
(iii) Weight of permanent appurtenances; and
(iv) Weight of full permanent fuel tanks.
(3) “Machinery weight” is the combined weight of installed engines or motors, control equipment, drive units, and batteries.
[CGD 72-61R, 37 FR 15782, Aug. 4, 1972]
Editorial Note:For Federal Register citations affecting § 183.33, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 183.35 Maximum weight capacity: Outboard boats.
(a) The maximum weight capacity marked on a boat that is designed or intended to use one or more outboard motors for propulsion must be a number that does not exceed one-fifth of the difference between its maximum displacement and boat weight.
(b) For the purposes of paragraph (a) of this section:
(1) “Maximum displacement” is the weight of the volume of water displaced by the boat at its maximum level immersion in calm water without water coming aboard except for water coming through one opening in the motor well with its greatest dimension not over 3 inches for outboard motor controls or fuel lines. For the purpose of this paragraph, a boat is level when it is transversely level and when either of the two following conditions are met:
(i) The forward point where the sheer intersects the vertical centerline plane and the aft point where the sheer intersects the upper boundary of the transom (stern) are equidistant above the water surface or are equidistant below the water surface.
(ii) The most forward point of the boat is level with or above the lowest point of water ingress.
(2) “Boat weight” is the combination of:
(i) Hull weight;
(ii) Deck and superstructure weight;
(iii) Weight of permanent appurtenances; and
(iv) Weight of full permanent fuel tanks.
[CGD 72-61, 37 FR 15782, Aug. 4, 1972, as amended by CGD 73-250, 40 FR 43857, Sept. 23, 1975; CGD 75-176, 42 FR 2681, Jan. 13, 1977; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.37 Maximum weight capacity: Boats rated for manual propulsion and boats rated for outboard motors of 2 horsepower or less.
(a) The maximum weight capacity marked on a boat that is rated for manual propulsion or for motors of 2 horsepower or less must not exceed 3/10 of the difference between the boat's maximum displacement and the boat's weight in pounds.
(b) For the purposes of paragraph (a) of this section:
(1) “Maximum displacement” is the weight of the volume of water displaced by the boat at its maximum level immersion in calm water without water coming aboard. For the purpose of this paragraph, a boat is level when it is transversely level and when either of the two following conditions are met:
(i) The forward point where the sheer intersects the vertical centerline plane and the aft point where the sheer intersects the upper boundary of the transom (stern) are equidistant above the water surface or are equidistant below the water surface.
(ii) The most forward point of the boat is level with or above the lowest point of water ingress.
(2) “Boat weight” is the combination of:
(i) Hull weight;
(ii) Deck and superstructure weight; and
(iii) Weight of permanent appurtenances.
[CGD 72-61R, 37 FR 15782, Aug. 4, 1972]
Editorial Note:For Federal Register citations affecting § 183.37, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 183.39 Persons capacity: Inboard and inboard-outdrive boats.
(a) The persons capacity in pounds marked on a boat that is designed to use one or more inboard engines or inboard-outdrive units for propulsion must not exceed the lesser of:
(1) The maximum weight capacity determined under § 183.33 for the boat; or
(2) For boats with a maximum persons capacity less than 550 pounds, the maximum persons capacity determined in the following manner:
(i) Float the boat in calm water with all its permanent appurtenances, including installed engines, full fuel system and tanks, control equipment, drive units and batteries.
(ii) Gradually add weights along one outboard extremity of each passenger carrying area, at the height of the seat nearest the center of that area, but no higher than the height of the gunwale and distributed equally forward and aft of that center in a plane parallel to the floorboards, until the boat assumes the maximum list or trim or both, without water coming aboard.
(iii) Compute the persons capacity in pounds in the following formula: Persons capacity = A/0.6 where A is the total of the weights added in paragraph (a)(2)(ii) of this section.
(b) The maximum persons capacity in whole numbers of persons marked on a boat that is designed or intended to use one or more inboard engines or inboard-outboard units must not exceed the value obtained by adding 32 pounds to the value determined in paragraph (a)(2)(iii), dividing the sum by 141 and rounding off the result to the nearest whole number. If the fraction is less than one-half, round down to the next whole integer and if the fraction is equal to or greater than one-half, round up to the next higher whole integer.
[CGD 78-034, 45 FR 2030, Jan. 10, 1980, as amended by CGD 83-012, 49 FR 39328, Oct. 5, 1984; 50 FR 18636, May 2, 1985]
§ 183.41 Persons capacity: Outboard boats.
(a) The persons capacity in pounds marked on a boat that is designed to use one or more outboard motors for propulsion must not exceed the lesser of:
(1) The maximum weight capacity determined under § 183.35 for the boat minus the motor and control weight, battery weight (dry), and full portable fuel tank weight required by § 183.75; or
(2) For boats with a maximum persons capacity less than 550 pounds, the maximum persons capacity determined in the following manner:
(i) Float the boat with all its permanent appurtenances.
(ii) Add, in normal operating positions, the dry motor and control weight, battery weight, and full portable fuel tank weight, if any, required by § 183.75 for the maximum horsepower capacity marked on the boat. Permanently installed fuel tanks shall be full of fuel.
(iii) Gradually add weights along one outboard extremity of each passenger carrying area, at the height of the seat nearest the center of that area, but no higher than the height of the gunwale, and distributed equally forward and aft of that center in a plane parallel to the floorboards until the boat assumes the maximum list or trim, or both without water coming aboard.
(iv) Compute the persons capacity in pounds using the following formula: Persons capacity = A/0.6 where A is the total of the weights added in paragraph (a)(2)(iii) of this section.
(b) The maximum persons capacity in whole numbers of persons marked on a boat designed or intended to use one or more outboard motors for propulsion must not exceed the value obtained by adding 32 pounds to the lesser of the values determined in paragraph (a)(1) or (a)(2)(iv), dividing the sum by 141, and rounding off the result to the nearest whole number. If the fraction is less than one-half, round down to the next lower whole integer and if the fraction is equal to or greater than one-half, round up to the next higher whole integer.
[CGD 78-034, 45 FR 2030, Jan. 10, 1980, as amended by CGD 83-012, 49 FR 39328, Oct. 5, 1984; 50 FR 18636, May 2, 1985; USCG-2016-1012, 82 FR 16521, Apr. 5, 2017]
§ 183.43 Persons capacity: Boats rated for manual propulsion and boats rated for outboard motors of 2 horsepower or less.
(a) The persons capacity in pounds marked on a boat that is rated for manual propulsion or for motors of 2 horsepower or less must not exceed:
(1) For boats rated for manual propulsion, 90 percent of the maximum weight capacity in pounds; and
(2) For boats rated for motors of 2 horsepower or less, 90 percent of the maximum weight capacity in pounds, less 25 pounds.
(b) The maximum persons capacity, in whole numbers of persons marked on a boat that is rated for manual propulsion must not exceed the value obtained by adding 32 pounds to the value determined in paragraph (a)(1), dividing the sum by 141, and rounding off the result to the nearest whole number. If the fraction is less than one-half, round down to the next lower integer and if the fraction is equal to or greater than one-half, round up to the next higher whole integer.
(c) The maximum persons capacity in whole numbers of persons marked on a boat rated for motors of 2 horsepower or less must not exceed the value obtained by adding 32 pounds to the value determined in paragraph (a)(2), dividing the sum by 141, and rounding off the result to the nearest whole number. If the fraction is less than one-half, round down to the next lower whole integer and if the fraction is equal to or greater than one-half, round up to the next higher whole integer.
[CGD 78-034, 45 FR 2031, Jan. 10, 1980]
Subpart D Safe Powering
§ 183.51 Applicability.
This subpart applies to monohull boats less than 20 feet in length, except sailboats, canoes, kayaks, and inflatable boats, that are designed or intended to use one or more outboard motors for propulsion.
§ 183.53 Horsepower capacity.
The maximum horsepower capacity marked on a boat must not exceed the horsepower capacity determined by the computation method discussed in paragraph (a) of this section, or for certain qualifying boats, the performance test method discussed in paragraph (b) of this section.
(a) The maximum horsepower capacity must be computed as follows:
(1) Compute a factor by multiplying the boat length in feet by the maximum transom width in feet excluding handles and other similar fittings, attachments, and extensions. If the boat does not have a full transom, the transom width is the broadest beam in the aftermost quarter length of the boat.
(2) Locate horsepower capacity corresponding to the factor in Table 183.53.
(3) For a boat with a factor over 52.5, if the horsepower capacity calculated in Table 183.53 is not an exact multiple of 5, it may be raised to the next exact multiple of 5.
(4) For flat bottom hard chine boats with a factor of 52 or less, the horsepower capacity must be reduced by one horsepower capacity increment in Table 183.53.
Table 183.53—Outboard Boat Horsepower Capacity
[Compute: Factor = Boat Length × Transom Width]
If factor (nearest integer) is | 0-35 | 36-39 | 40-42 | 43-45 | 46-52
Horsepower Capacity is | 3 | 5 | 7.5 | 10 | 15
[Note: For flat bottom hard chine boats, with factor of 52 or less, reduce one capacity limit (e.g. 5 to 3)]
If factor is over 52.5 and the boat has | Remote steering and at least 20″ transom height | No remote steering, or less than 20″ transom height
For flat bottom hard chine boats | For other boats
Horsepower capacity is (raise to nearest multiple of 5) | (2 × Factor) −90 | (0.5 × Factor)−15 | (0.8 × Factor)−25
(b) For boats qualifying under this paragraph, the performance test method described in this paragraph may be used to determine the horsepower capacity.
(1) Qualifying criteria. (i) Thirteen feet or less in length;
(ii) Remote wheel steering;
(iii) Transom height
(A) Minimum 19 inch transom height; or,
(B) For boats with at least a 19 inch motorwell height, a minimum 15 inch transom height;
(iv) Maximum persons capacity not over two persons;
(2) Boat preparation. (i) The boat must be rigged with equipment recommended or provided by the boat and motor manufacturer and tested with the highest horsepower production powerplant for which the boat is to be rated, not to exceed 40 horsepower.
(ii) Standard equipment must be installed in accordance with manufacturers' instructions.
(iii) The lowest ratio (quickest) steering system offered on the boat model being tested must be installed.
(iv) The outboard motor must be fitted with the manufacturer's recommended propeller providing maximum speed.
(v) Standard permanently installed fuel tanks must be no more than one-half full. Boats without permanent tanks must be tested with one full portable tank.
(vi) Portable tanks must be in their designated location or placed as far aft as possible.
(vii) The outboard motor must be placed in the lowest vertical position on the transom or, if mounting instructions are provided with the boat, at the height recommended.
(viii) Boat bottom, motor and propeller must be in new or almost new condition.
Note:
The use of the following special equipment should be considered because of the potential for exceeding the capabilities of the boat while performing the test:
Racing Type Personal Flotation Device Helmet.
(3) Test conditions. Testing must be conducted on smooth, calm water with the wind speed below 10 knots. The test must be conducted with no load other than a driver who must weigh no more than 200 pounds. The motor trim angle must be adjusted to provide maximum full throttle speed short of excessive porpoising or propeller ventilation or “cavitation”, so that there is no loss of directional control.
(4) Quick turn test procedure. Set throttle at a low maneuvering speed and steer the boat straight ahead. Turn the steering wheel 180° in the direction of least resistance in 1/2 second or less and hold it at that position without changing the throttle or trim settings during or after the wheel change. The boat completes the maneuver successfully if it is capable of completing a 90° turn without the driver losing control of the boat or reducing the throttle setting. Gradually increase the boat's turn entry speed incrementally until the boat does not complete the Quick Turn Test successfully or successfully completes it at maximum throttle.
Note:
It is recognized that operator skill and familiarity with a particular boat and motor combination will affect the test results. It is permissible to make a number of practice runs through the quick turn test at any throttle setting.
(5) Test course method. Set throttle for 30 miles per hour boat speed and run the test course set up in accordance with Figure 183.53, passing outside the designated avoidance marker for 35 to 37.5 miles per hour without contacting any of the course markers. If the boat successfully completes this run of the test course, increase the throttle setting to 35 to 37.5 miles per hour boat speed and run the course passing outside the designated avoidance marker for that speed without contacting any of the course markers. If the boat successfully completes this run of the test course and the motor was not at full throttle, increase the throttle setting to 37.5 to 42.5 miles per hour boat speed and run the course passing outside the designated avoidance marker for that speed without contacting any of the course markers. If the boat successfully completes this run of the test course and the motor was not at full throttle, increase the throttle setting to 42.5 miles per hour or more and run the course passing outside the designated avoidance marker for that speed without contacting any of the course markers. If the boat successfully completes this run of the test course and the motor was not at full throttle, continue to increase the throttle setting and run the test course passing outside the designated avoidance marker for 42.5 miles per hour or more until the boat fails to complete the test successfully or the boat completes the test course maneuvers successfully at full throttle. The boat successfully completes the test course if the driver is able to maneuver it between the designated avoidance markers without striking the markers and without losing control of the boat or reducing the throttle setting. There must be no change in position of any equipment on board and there must be no change of position of personnel in order to influence the test results. There must be no instability evidenced by oscillating motion in the roll or yaw axes exhibited while negotiating the course.
Note:
It is recognized that operator skill and familiarity with a particular boat and motor combination will affect the test results. It is therefore considered permissible to make a number of practice runs through the test course at any throttle setting.
(6) Maximum horsepower capacity. (i) For boats capable of less than 35 miles per hour, the maximum horsepower capacity must be the maximum horsepower with which the boat was able to successfully complete the Quick Turn Test Procedure in § 183.53(b)(4) at full throttle or the maximum horsepower determined under the calculations in § 183.53(a) of this section.
(ii) For boats capable of 35 miles per hour or more, the maximum horsepower capacity must be the maximum horsepower with which the boat was able to successfully complete both the Quick Turn Test Procedure in § 183.53(b)(4) and the Test Course Method in § 183.53(b)(5) at full throttle or the calculations in § 183.53(a) of this section.
(iii) The maximum horsepower capacity determined in accordance with § 183.53(b) must not exceed 40 horsepower.
Figure 183.53—Boat Horsepower Capacity Test Course—35 MPH or More
[CGD 85-002, 51 FR 37574, Oct. 23, 1986]
Subpart E Flotation and Safe Loading Requirements-Outboard Motor and Related Equipment Test Weights
Source: USCG-2016-1012, 82 FR 16521, Apr. 5, 2017, unless otherwise noted.
§ 183.75 Applicability.
Manufacturers of vessels to which this subpart applies must use test weights that are not less than the recommended weights set forth in Table 183.75. Table 183.75 details the weight (in pounds) of gasoline outboard engines and related equipment for various rated power (horsepower) ranges.
Table 183.75—Weights (In Pounds) of Gasoline Outboard Engines and Related Equipment for Various Rated Power (Horsepower) Ranges
Single engine installations
Column number
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Engine power range (Horsepower) | Dry weight 1 2 | Running weight 3 | Swamped weight 4 | Controls & rigging 5 | Battery weight, dry | Battery weight submerged | Full portable fuel tank 6 | Total weight (Sum of columns 3,5,6,8)
0.1-2.0 | 30 | 32 | 27 | 0 | 0 | 0 | 0 | 32
2.1-3.9 | 42 | 44 | 37 | 0 | 0 | 0 | 0 | 44
4.0-6.9 | 66 | 69 | 59 | 0 | 0 | 0 | 25 | 94
7.0-10.9 | 105 | 110 | 94 | 5 | 20 | 11 | 50 | 185
11.0-22.9 | 127 | 133 | 113 | 6 | 45 | 25 | 50 | 234
23.0-34.9 | 187 | 196 | 167 | 9 | 45 | 25 | 100 | 350
35.0-64.9 | 286 | 300 | 255 | 14 | 45 | 25 | 100 | 459
65.0-94.9 | 439 | 461 | 392 | 22 | 45 | 25 | 100 | 628
95.0-104.9 | 458 | 481 | 409 | 23 | 45 | 25 | 100 | 649
105.0-144.9 | 526 | 552 | 469 | 26 | 45 | 25 | 100 | 723
145.0-194.9 | 561 | 589 | 501 | 28 | 45 | 25 | 100 | 762
195.0-209.9 | 652 | 685 | 582 | 33 | 45 | 25 | 100 | 863
210.0-300.0 | 699 | 734 | 624 | 35 | 45 | 25 | 100 | 914
300.1-350.0 | 884 | 928 | 789 | 44 | 45 | 25 | 100 | 1,117
Notes:
1 Dry weight is the manufacturer's published weight for the shortest midsection increased by 10 percent to account for longer midsections and additional required hardware usually not included in published weights. This weight is intended to represent the heaviest model in each power category. For boats designed with a transom height of 20 inches or less, the weight in Column 2 may be reduced by 10 percent. Recalculate Columns 3, 4, and 9 as appropriate.
2 For diesel outboards, replace the value in Column 2 with the manufacturer's published dry weight + 10 percent.
3 Running weight is the dry weight plus fluids (including 2-stroke oil) and the heaviest recommended propeller. Calculated as 5 percent of dry weight.
4 Swamped weight is 85 percent of running weight.
5 Rigging and controls include engine related hardware required to complete the installation (e.g., controls, cables, hydraulic hoses, steering pumps and cylinders). Calculated as 5 percent of dry weight.
6 If the boat is equipped with a permanent fuel system and is not intended to use a portable tank, the portable fuel tank weight may be omitted.
Subpart F Flotation Requirements for Inboard Boats, Inboard/Outdrive Boats, and Airboats
Source: CGD 75-168, 42 FR 20243, Apr. 18, 1977, unless otherwise noted.
§ 183.101 Applicability.
This subpart applies to monohull inboard boats, inboard/outdrive boats, and airboats less than 20 feet in length, except sailboats, canoes, kayaks, inflatable boats, submersibles, surface effect vessels, amphibious vessels, and raceboats.
[CGD 75-168, 42 FR 20243, Apr. 18, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.105 Quantity of flotation required.
(a) Each boat must have enough flotation to keep any portion of the boat above the surface of the water when the boat has been submerged in calm, fresh water for at least 18 hours and loaded with:
(1) A weight that, when submerged, equals two-fifteenths of the persons capacity marked on the boat;
(2) A weight that, when submerged, equals 25 percent of the dead weight; and
(3) A weight in pounds that, when submerged, equals 62.4 times the volume in cubic feet of the two largest air chambers, if air chambers are used for flotation.
(b) For the purpose of this section, “dead weight” means the maximum weight capacity marked on the boat minus the persons capacity marked on the boat.
§ 183.110 Definitions.
For the purpose of this subpart:
Bilge means the area in the boat, below a height of 4 inches measured from the lowest point in the boat where liquid can collect when the boat is in its static floating position, except engine rooms.
Connected means allowing a flow of water in excess of one-quarter ounce per hour from the engine room bilge into any other compartment with a 12 inch head of water on the engine room side of the bulkhead.
Engine room bilge means the area in the engine room or a connected compartment below a height of 12 inches measured from the lowest point where liquid can collect in these compartments when the boat is in its static floating position.
Engine room means the compartment where a permanently installed gasoline or diesel engine is installed, including connected compartments.
Open to atmosphere means a compartment that has at least 15 square inches of open area directly exposed to the atmosphere for each cubic foot of net compartment volume.
Sealed compartment means an enclosure that can resist an exterior water level of 12 inches without seepage of more than one-quarter fluid ounce per hour.
[CGD 77-145, 43 FR 56858, Dec. 4, 1978, as amended by CGD 82-010, 48 FR 8273, Feb. 28, 1983; CGD 85-098, 52 FR 19728, May 27, 1987; CGD 96-026, 61 FR 33670, June 28, 1996; USCG-1999-5832, 64 FR 34716, June 29, 1999; USCG-1999-5151, 64 FR 67176, Dec. 1, 1999]
§ 183.112 Flotation material and air chambers.
(a) Flotation materials must meet the requirements in § 183.114 as listed in Table 183.114 when used in the: (1) Engine room bilge, (2) engine room, or (3) bilge, unless located in a sealed compartment.
(b) Air chambers used to meet the flotation requirements of this subpart must not be integral with the hull.
[CGD 77-145, 43 FR 56859, Dec. 4, 1978; 44 FR 47934, Aug. 16, 1979]
§ 183.114 Test of flotation materials.
(a) Vapor test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed in a fully saturated gasoline vapor atmosphere for 30 days at a minimum temperature of 38 °C.
(b) 24-hour gasoline test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed for 24 hours at 23 plus or minus 2 °C in reference fuel B, of ASTM D 471 (incorporated by reference, see § 183.5).
(c) 30-day gasoline test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed for 30 days at 23 plus or minus 2 °C in reference fuel B, of ASTM D 471 (incorporated by reference, see § 183.5).
(d) 24-hour oil test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed for 24 hours at 23 plus or minus 2 °C in reference oil No. 2, of ASTM D 471 (incorporated by reference, see § 183.5).
(e) 30-day oil test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed for 30 days at 23 plus or minus 2 °C in reference oil No. 2, of ASTM D 471 (incorporated by reference, see § 183.5).
(f) 24-hour bilge cleaner test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed for 24 hours at 23 plus or minus 2 °C in a 5-percent solution of trisodium phosphate in water.
(g) 30-day bilge cleaner test. The flotation material must not reduce in buoyant force more than 5 percent after being immersed for 30 days at 23 plus or minus 2 °C in a 5-percent solution of trisodium phosphate in water.
(h) The buoyant force reduction in paragraphs (a) through (g) of this section is measured in accordance with ASTM D 2842 (incorporated by reference, see § 183.5).
Table 183.114—Flotation Performance Tests
Test 183.114 | Area 183.110
(b) Engine room bilge | (c) Engine room unless open to atmosphere | (d) Bilge
(a) Vapor test | X
(b) 24 hour gasoline test | X
(c) 30 day gasoline test | X
(d) 24 hour oil test | X
(e) 30 day oil test | X
(f) 24 hour bilge cleaner test | X
(g) 30 day bilge cleaner test | X
[CGD 77-145, 43 FR 56859, Dec. 4, 1978; 44 FR 47934, Aug. 16, 1979, as amended by USCG-2000-7223, 65 FR 40059, June 29, 2000]
Subpart G Flotation Requirements for Outboard Boats Rated for Engines of More Than 2 Horsepower
Source: CGD 75-168, 42 FR 20243, Apr. 18, 1977, unless otherwise noted.
238 General
§ 183.201 Applicability.
(a) This subpart applies to monohull outboard boats that are:
(1) Less than 20 feet in length; and
(2) Rated for outboard engines of more than 2 horsepower.
(b) This subpart does not apply to sailboats, canoes, kayaks, inflatable boats, submersibles, surface effect vessels, amphibious vessels, and raceboats.
[CGD 75-168, 42 FR 20243, Apr. 18, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.202 Flotation and certification requirements.
Each boat to which this subpart applies must be manufactured, constructed, or assembled to pass the stability and flotation tests prescribed in §§ 183.225(a), 183.230(a), and 183.235(a).
§ 183.205 Passenger carrying area.
(a) For the purpose of this section a boat is level when it is supported on its keel at the two points shown in Figure 2.
(b) As used in this subpart, the term “passenger carrying area” means each area in a boat in which persons can sit in a normal sitting position or stand while the boat is in operation. Passenger carrying areas are illustrated in Figures 3 through 8.
(c) The length of the passenger carrying area is the distance along the centerline of the boat between two vertical lines, one at the forward end and one at the aft end of the passenger carrying area when the boat is level as illustrated in Figures 3 and 4. For boats with a curved stem inside the passenger carrying area, the forward vertical line is where a line 45 degrees to the horizontal when the boat is level is tangent to the curve of the stem, as illustrated in Figure 5. For boats with cabins, the forward vertical line is where there is a minimum distance of two feet between the inside top of the cabin and the water line formed when the boat is swamped and loaded with weights under § 183.220 as illustrated in Figure 6.
(d) The breadth of each passenger carrying area is the distance between two vertical lines at the mid-length, excluding consoles, of the passenger carrying area when the boat is level as illustrated in Figures 7 and 8. For boats with round chines inside the passenger carrying area, the vertical line is where a transverse line 45 degrees to the horizontal is tangent to the arc of the chine, as illustrated in Figure 8.
[CGD 75-168, 42 FR 20243, Apr. 18, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.210 Reference areas.
(a) The forward reference area of a boat is the forward most 2 feet of the top surface of the hull or deck, as illustrated in Figure 9.
(b) The aft reference area of a boat is the aft most two feet of the top surface of the hull or deck, as illustrated in Figure 9.
§ 183.215 Reference depth.
Reference depth is the minimum distance between the uppermost surface of the submerged reference area of a boat and the surface of the water measured at the centerline of the boat, as illustrated in Figure 10. If there is no deck surface at the centerline of the boat from which a measurement can be made, the reference depth is the average of two depth measurements made on opposite sides of, and at an equal distance from, the centerline of the boat.
§ 183.220 Preconditioning for tests.
A boat must meet the following conditions for at least 18 hours before the tests required by §§ 183.225, 183,230, and 183.235:
(a) Manufacturer supplied permanent appurtenances such as windshields and convertible tops must be installed on the boat.
(b) The boat must be loaded with a quantity of weight that, when submerged, is equal to the sum of the following:
(1) The sum of 50 percent of the first 550 pounds of the persons capacity marked on the boat and 12 1/2 percent of the remainder of the persons capacity.
(2) Twenty-five percent of the result of the following calculation, but not less than zero: The maximum weight capacity marked on the boat; less the weight shown in Column 9 of Table 183.75 for maximum horsepower marked on the boat; less the persons capacity marked on the boat.
(c) The weights required by paragraph (b) of this section must be placed in the boat so that the center of gravity of each amount of weight required by paragraphs (b)(1) and (b)(2) of this section is within the shaded area illustrated in Figure 11. The location and dimensions of the shaded area are as follows:
(1) The shaded area is centered at the mid-length of the passenger carrying area and at the mid-breadth of the boat;
(2) The length of the shaded area, measured along the centerline of the boat, is equal to 40 percent of the length of the passenger carrying area of the boat; and
(3) The breadth of the shaded area, measured at the midlength of the passenger carrying area, is equal to 40 percent of the breadth of the passenger carrying area of the boat.
(d) Weight must be placed in the normal operating position of the motor and controls and the battery in lieu of this equipment. The required quantity of weight used for this purpose depends upon the maximum rated horsepower of the boat being tested and is specified in Columns 4 and 7 of Table 183.75 for the swamped weight of the motor and controls and for the submerged weight of the battery, respectively.
(e) Permanent fuel tanks must be filled with fuel and each external opening into the fuel tank must be sealed.
(f) The boat must be keel down in the water.
(g) The boat must be swamped, allowing water to flow between the inside and outside of the boat, either over the sides, through a hull opening, or both. Entrapped air in the flooded portion of the boat must be eliminated.
(h) Water must flood the two largest air chambers and all air chambers integral with the hull.
[CGD 75-168, 42 FR 20243, Apr. 18, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999; USCG-2016-1012, 82 FR 16522, Apr. 5, 2017]
§ 183.222 Flotation material and air chambers.
(a) Flotation materials must meet the requirements in § 183.114 as listed in Table 183.114 when used in the bilge, unless located in a sealed compartment.
(b) Air chambers used to meet the flotation requirements of this subpart must not be integral with the hull.
[CGD 77-145, 43 FR 56859, Dec. 4, 1978; 44 FR 47934, Aug. 16, 1979]
239 Tests
§ 183.225 Flotation test for persons capacity.
Flotation standard. When the conditions prescribed in § 183.220 are met, the boat must float in fresh, calm water as follows:
(a) The angle of heel does not exceed 10 degrees from the horizontal.
(b) Any point on either the forward or aft reference area is above the surface of the water.
(c) The reference depth at the reference area that is opposite the reference area that is above the surface of the water is 6 inches or less.
§ 183.230 Stability test.
(a) Flotation standard. When the conditions prescribed in § 183.220 (a), (d) through (h) and paragraphs (b) and (c) of this section are met, the boat must float in fresh, calm water as follows:
(1) The angle of heel does not exceed 30 degrees from the horizontal.
(2) Any point on either the forward or aft reference area is above the surface of the water.
(3) The reference depth at the reference area that is opposite the reference area that is above the surface of the water is 12 inches or less.
(b) Quantity of weight used. Load the boat with a quantity of weight that, when submerged, is equal to the sum of the following:
(1) One-half of the quantity of weight required by § 183.220(b)(1).
(2) The quantity of weight required by § 183.220(b)(2).
(c) Placement of quantity of weight: starboard side. Place the weight required by paragraph (b) of this section in the boat so that:
(1) The quantity of weight required by § 183.220(b)(2) is positioned in accordance with § 183.220(c); and
(2) One-half the quantity of weight required by § 183.220(b)(1) is uniformly distributed over a distance along the outboard perimeter of the starboard side of the passenger carrying area that is equal to at least 30 percent of the length of the passenger carrying area so that the center of gravity of the quantity of weight is located within the shaded area illustrated in Figure 12, the center of gravity of the amount of weight placed on the floor of the boat is at least 4 inches above the floor, and the center of gravity of the amount of weight placed on a seat is at least 4 inches above the seat. The location and dimensions of the shaded area are as follows:
(i) The shaded area is centered at the mid-length of the passenger carrying area;
(ii) The length of the shaded area is equal to 70 percent of the length of the passenger carrying area; and
(iii) The breadth of the shaded area is 6 inches from:
(A) For weights placed on the floor, the outboard perimeter of the passenger carrying area; and
(B) For weights placed on a seat, a vertical line inside the passenger carrying area as illustrated in Figure 13.
(d) Placement of quantity of weight: port side. The quantity of weight required by paragraph (b)(1) of this section is placed along the port side of the passenger carrying area in accordance with the conditions prescribed in paragraph (c)(2) of this section.
§ 183.235 Level flotation test without weights for persons capacity.
When the conditions prescribed in § 183.220 (a) and (d) through (h) are met, the boat must float in fresh, calm water as follows:
(a) The angle of heel does not exceed 10 degrees from the horizontal.
(b) Any point on either the forward or aft reference area is above the surface of the water.
(c) The reference depth at the reference area that is opposite the reference area that is above the surface of the water is 6 inches or less.
[CGD 77-145, 43 FR 56859, Dec. 4, 1978, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
Subpart H Flotation Requirements for Outboard Boats Rated for Engines of 2 Horsepower or Less
Source: CGD 75-168, 42 FR 20245, Apr. 18, 1977, unless otherwise noted.
240 General
§ 183.301 Applicability.
(a) This subpart applies to monohull outboard boats that are:
(1) Less than 20 feet in length; and
(2) Rated for manual propulsion or outboard engines of 2 horsepower or less.
(b) This subpart does not apply to sailboats, canoes, kayaks, inflatable boats, submersibles, surface effect vessels, amphibious vessels, and raceboats.
[CGD 75-168, 42 FR 20245, Apr. 18, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.302 Flotation requirements.
Each boat to which this subpart applies must be manufactured, constructed, or assembled to pass the stability and flotation tests prescribed in §§ 183.325(a), 183.330(a), and 183.335(a).
§ 183.305 Passenger carrying area.
(a) For the purpose of this section, a boat is level when it is supported on its keel at the two points shown in Figure 2.
(b) As used in this subpart, the term “passenger carrying area” means each area in a boat in which persons can sit in a normal sitting position or stand while the boat is in operation. Passenger carrying areas are illustrated in Figures 3 through 8.
(c) The length of each passenger carrying area is the distance along the centerline of the boat between two vertical lines, one at the forward end and one at the aft end of the passenger carrying area, when the boat is level, as illustrated in Figures 3 and 4. For boats with a curved stem inside the passenger carrying area, the forward vertical line is where a line 45 degrees to the horizontal when the boat is level is tangent to the curve of the stem, as illustrated in Figure 5. For boats with cabins, the forward vertical line is where there is a minimum distance of two feet between the inside top of the cabin and the water line formed when the boat is swamped and loaded with weights under § 183.320 as illustrated in Figure 6.
(d) The breadth of the passenger carrying area is the distance beteen two vertical lines at the mid-length, excluding consoles, of the passenger carrying area when the boat is level as illustrated in Figures 7 and 8. For boats with round chines inside the passenger carrying area, the vertical line is where a transverse line 45 degrees to the horizontal is tangent to the arc of the chine, as illustrated in Figure 7.
[CGD 75-168, 42 FR 20245, Apr. 18, 1977; 42 FR 24738, May 16, 1977]
§ 183.310 Reference areas.
(a) The forward reference area of a boat is the forwardmost 2 feet of the top surface of the hull or deck as illustrated in Figure 9.
(b) The aft reference area of a boat is the aftmost two feet of the top surface of the hull or deck, as illustrated in Figure 9.
§ 183.315 Reference depth.
Reference depth is the minimum distance between the uppermost surface of the submerged reference area of a boat and the surface of the water measured at the centerline of the boat, as illustrated in Figure 10. If there is no deck surface at the centerline of the boat from which a measurement can be made, the reference depth is the average of two depth measurements made on opposite sides of, and at an equal distance from, the centerline of the boat.
§ 183.320 Preconditioning for tests.
A boat must meet the following conditions for at least 18 hours before the tests required by §§ 183.325, 183.330, and 183.335:
(a) Manufacturer supplied permanent appurtenances such as windshields, and convertible tops must be installed on the boat.
(b) The boat must be loaded with a quantity of weight that, when submerged, is equal to the sum of the following:
(1) Two-fifteenths of the persons capacity marked on the boat.
(2) Twenty-five percent of the result of the following calculation, but not less than zero: the maximum weight capacity marked on the boat; less the weight shown in Column 9 of Table 183.75 for the maximum horsepower marked on the boat; less the persons capacity marked on the boat.
(c) The weights required by paragraph (b) of this section are placed in the boat so that the center of gravity of each amount of weight required by paragraphs (b)(1) and (b)(2) of this section is within the shaded area illustrated in Figure 11. The location and dimensions of the shaded area are as follows:
(1) The shaded area is centered at the mid-length of the passenger carrying area and at the mid-breadth of the boat;
(2) The length of the shaded area, measured along the centerline of the boat, is equal to 40 percent of the length of the passenger carrying area of the boat; and
(3) The breadth of the shaded area, measured at the mid-length of the passenger carrying area, is equal to 40 percent of the breadth of the passenger carrying area of the boat.
(d) Weight must be placed in the normal operating position of the motor and controls in lieu of this equipment. The quantity of weight used for this purpose depends upon the maximum rated horsepower of the boat being tested and is specified in Column 4 of Table 183.75 for the swamped weight of the motor and controls.
(e) Permanent fuel tanks must be filled with fuel and each external opening into the fuel tank must be sealed.
(f) The boat must be keel down in the water.
(g) The boat must be swamped, allowing water to flow between the inside and the outside of the boat, either over the sides, through a hull opening, or both. Entrapped air in the flooded portion of the boat must be eliminated.
[CGD 75-168, 42 FR 20245, Apr. 18, 1977, as amended by USCG-2016-1012, 82 FR 16522, Apr. 5, 2017]
§ 183.322 Flotation materials.
(a) Flotation materials must meet the requirements in § 183.114 as listed in Table 183.114 when used in the bilge, unless located in a sealed compartment.
[CGD 77-145, 43 FR 56859, Dec. 4, 1978; 44 FR 47934, Aug. 16, 1979]
241 Tests
§ 183.325 Flotation test for persons capacity.
Flotation standard. When the conditions prescribed in § 183.320 are met, the boat must float in fresh, calm water as follows:
(a) The angle of heel does not exceed 10 degrees from the horizontal.
(b) Any point on either the forward or aft reference area is above the surface of the water.
(c) The reference depth at the reference area that is opposite the reference area that is above the surface of the water is 6 inches or less.
§ 183.330 Stability test.
(a) Flotation standard. When the conditions prescribed in § 183.320 (a), (d) through (g) and paragraphs (b) and (c) of this section are met, the boat must float in fresh, calm water as follows:
(1) The angle of heel does not exceed 30 degrees from the horizontal.
(2) Any point on either the forward or aft reference area is above the surface of the water.
(3) The reference depth at the reference area that is opposite the reference area that is above the surface of the water is 12 inches or less.
(b) Quantity of weight used. Load the boat with quantity of weight that, when submerged, is equal to the sum of the following:
(1) One-half the quantity of weight required by § 183.320(b)(1).
(2) The quantity of weight required by § 183.320(b)(2).
(c) Placement of quantity of weight: starboard side. Place the quantity of weight required by paragraph (b) of this section in the boat so that:
(1) The quantity of weight required by § 183.320(b)(2) is positioned in accordance with § 183.320(c); and
(2) One-half the quantity of weight required by § 183.320(b)(1) is uniformly distributed over a distance along the outboard perimeter of the starboard side of the passenger carrying area that is equal to at least 30 percent of the length of the passenger carrying area so that the center of gravity of the quantity of weight is located within the shaded area illustrated in Figure 12, the center of gravity of the amount of weight placed on the floor of the boat is at least 4 inches above the floor and the center of gravity of the amount of weight placed on a seat is at least 4 inches above the seat. The location and dimensions of the shaded area are as follows:
(i) The shaded area is centered at the mid-length of the passenger carrying area;
(ii) The length of the shaded area is equal to 70 percent of the length of the passenger carrying area; and
(iii) The breadth of the shaded area is 6 inches from:
(a) For weights placed on the floor, the outboard perimeter of the passenger carrying area; and
(b) For weights placed on a seat, a vertical line inside the passenger carrying area as illustrated in Figure 13.
(d) Placement of quantity of weight: port side. The quantity of weight required by paragraph (b)(1) of this section is placed along the port side of the passenger carrying area in accordance with the conditions prescribed in paragraph (c)(2) of this section.
§ 183.335 Level flotation test without weights for persons capacity.
When the conditions prescribed in § 183.320 (a) and (d) through (g) are met, the boat must float in fresh, calm water as follows:
(a) The angle of heel does not exceed 10 degrees from the horizontal.
(b) Any point on either the forward or aft reference area is above the surface of the water.
(c) The reference depth at the reference area that is opposite the reference area that is above the surface of the water is 6 inches or less.
[CGD 75-168, 42 FR 20245, Apr. 18, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
Subpart I Electrical Systems
Source: CGD 73-217, 42 FR 5944, Jan. 31, 1977, unless otherwise noted.
242 General
§ 183.401 Purpose, applicability, and effective dates.
(a) This subpart applies to all boats that have gasoline engines, except outboard engines, for electrical generation, mechanical power, or propulsion.
(b) [Reserved]
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55736, Dec. 15, 1983; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.402 Definitions.
As used in this subpart—
AWG means American Wire Gauge.
Electrical component means electrical equipment such as, but not limited to, conductors, solenoids, motors, generators, alternators, distributors, resistors, appliances and electrical control devices.
Pigtails means external power conductors or wires that are part of electrical components and appliances, such as bilge pumps, blowers, lamps, switches, solenoids, and fuses.
Sheath means a material used as a continuous protective covering, such as electrical tape, molded rubber, molded plastic, or flexible tubing, around one or more insulated conductors.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by CGD 85-098, 52 FR 19728, May 27, 1987; CGD 96-026, 61 FR 33670, June 28, 1996]
§ 183.405 General.
Each electrical component on a boat to which this subpart applies must meet the requirements of this subpart unless the component is part of an outboard engine or part of portable equipment.
243 Manufacturer Requirements
§ 183.410 Ignition protection.
(a) Each electrical component must not ignite a propane gas and air mixture that is 4.25 to 5.25 percent propane gas by volume surrounding the electrical component when it is operated at each of its manufacturer rated voltages and current loadings, unless it is isolated from gasoline fuel sources, such as engines, and valves, connections, or other fittings in vent lines, fill lines, distribution lines or on fuel tanks, in accordance with paragraph (b) of this section.
(b) An electrical component is isolated from a gasoline fuel source if:
(1) A bulkhead that meets the requirements of paragraph (c) of this section is between the electrical component and the gasoline fuel source;
(2) The electrical component is:
(i) Lower than the gasoline fuel source and a means is provided to prevent fuel and fuel vapors that may leak from the gasoline fuel source from becoming exposed to the electrical component; or
(ii) Higher than the gasoline fuel source and a deck or other enclosure is between it and the gasoline fuel source; or
(3) The space between the electrical component and the gasoline fuel source is at least two feet and the space is open to the atmosphere.
(c) Each bulkhead required by paragraph (b)(1) of this section must:
(1) Separate the electrical component from the gasoline fuel source and extend both vertically and horizontally the distance of the open space between the fuel source and the ignition source;
(2) Resist a water level that is 12 inches high or one-third of the maximum height of the bulkhead, whichever is less, without seepage of more than one-quarter fluid ounce of fresh water per hour; and
(3) Have no opening located higher than 12 inches or one-third the maximum height of the bulkhead, whichever is less, unless the opening is used for the passage of conductors, piping, ventilation ducts, mechanical equipment, and similar items, or doors, hatches, and access panels, and the maximum annular space around each item or door, hatch or access panel must not be more than one-quarter inch.
§ 183.415 Grounding.
If a boat has more than one gasoline engine, grounded cranking motor circuits must be connected to each other by a common conductor circuit that can carry the starting current of each of the grounded cranking motor circuits.
§ 183.420 Batteries.
(a) Each installed battery must not move more than one inch in any direction when a pulling force of 90 pounds or twice the battery weight, whichever is less, is applied through the center of gravity of the battery as follows:
(1) Vertically for a duration of one minute.
(2) Horizontally and parallel to the boat's center line for a duration of one minute fore and one minute aft.
(3) Horizontally and perpendicular to the boat's center line for a duration of one minute to starboard and one minute to port.
(b) Each battery must be installed so that metallic objects cannot come in contact with the ungrounded battery terminals.
(c) Each metallic fuel line and fuel system component within 12 inches and above the horizontal plane of the battery top surface as installed must be shielded with dielectric material.
(d) Each battery must not be directly above or below a fuel tank, fuel filter, or fitting in a fuel line.
(e) A vent system or other means must be provided to permit the discharge from the boat of hydrogen gas released by the battery.
(f) [Reserved]
(g) Each battery terminal connector must not depend on spring tension for its mechanical connection to the terminal.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55736, Dec. 15, 1983]
§ 183.425 Conductors: General.
(a) Each conductor must be insulated, stranded copper.
(b) Except for intermittent surges each conductor must not carry a current greater than that specified in Table 5 for the conductor's gauge and temperature rating.
(c) For conductors in engine spaces, amperages must be corrected by the appropriate correction factor in note 1 of Table 5.
(d) Each conductor in a multiconductor sheath must be at least a No. 18 AWG conductor.
(e) Each conductor installed separately must be at least a No. 16 AWG conductor.
(f) Each No. 18 AWG conductor in a multiconductor sheath may not extend out of the sheath more than 30 inches.
(g) This section does not apply to communications systems; electronic navigation equipment; electronic circuits having a current flow of less than one ampere; conductors which are totally inside an equipment housing; resistance conductors that control circuit amperage; high voltage secondary conductors and terminations that are in ignition systems; pigtails of less than seven inches of exposed length and cranking motor conductors.
Table 5—Allowable Amperage of Conductors
Conductor size (AWG) | Temperature rating of conductor insulation
60 °C (140 °F) | 75 °C (167 °F) | 80 °C (176 °F) | 90 °C (194 °F) | 105 °C (221 °F) | 125 °C (257 °F) | 200 °C (392 °F)
18 | 10 | 10 | 15 | 20 | 20 | 25 | 25
16 | 15 | 15 | 20 | 25 | 25 | 30 | 35
14 | 20 | 20 | 25 | 30 | 35 | 40 | 45
12 | 25 | 25 | 35 | 40 | 45 | 50 | 55
10 | 40 | 40 | 50 | 55 | 60 | 70 | 70
8 | 55 | 65 | 70 | 70 | 80 | 90 | 100
6 | 80 | 95 | 100 | 100 | 120 | 125 | 135
4 | 105 | 125 | 130 | 135 | 160 | 170 | 180
3 | 120 | 145 | 150 | 155 | 180 | 195 | 210
2 | 140 | 170 | 175 | 180 | 210 | 225 | 240
1 | 165 | 195 | 210 | 210 | 245 | 265 | 280
0 | 195 | 230 | 245 | 245 | 285 | 305 | 325
00 | 225 | 265 | 285 | 285 | 330 | 355 | 370
000 | 260 | 310 | 330 | 330 | 385 | 410 | 430
0000 | 300 | 360 | 385 | 385 | 445 | 475 | 510
NOTES
1. See the following table: | 60 °C | 75 °C | 80 °C | 90 °C | 105 °C | 125 °C | 200 °C
(140 °F) | (167 °F) | (176 °F) | (194 °F) | (221 °F) | (257 °F) | (392 °F)
Temperature rating of conductor | 0.58 | 0.75 | 0.78 | 0.82 | 0.85 | 0.89 | 1.00
2. See the following table: | Correction
factor
Number of current carrying conductors:
3 | 0.70
4 to 6 | .60
7 to 24 | .50
25 and above | .40
[CGD 73-217, 42 FR 5944, Jan. 31, 1977; 42 FR 24739, May 16, 1977, as amended by CGD 81-092, 48 FR 55736, Dec. 15, 1983]
§ 183.430 Conductors in circuits of less than 50 volts.
(a) Each conductor in a circuit that has a nominal voltage of less than 50 volts must:
(1) Meet the requirements of § 183.435; or
(2) Meet:
(i) The insulating material temperature rating requirements of SAE Standard J378; and
(ii) SAE Standard J1127, or SAE Standard 1128.
(b) This section does not apply to communication systems; electronic navigation equipment; resistance conductors that control circuit amperage; and pigtails of less than seven inches of exposed length.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by CGD 87-009, 53 FR 36971, Sept. 23, 1988]
§ 183.435 Conductors in circuits of 50 volts or more.
(a) Each conductor in a circuit that has a nominal voltage of 50 volts or more must be:
(1) A conductor that has insulation listed and classified moisture resistant and flame retardant in Article 310, NFPA No. 70, National Electric Code;
(2) A flexible cord type SO, STO, ST, SJO, SJT, or SJTO listed in Article 400, NFPA No. 70, National Electric Code;
(3) A conductor that meets IEEE Standard 45.
(4) A conductor that meets UL Standard 1426.
(b) Where the nominal circuit voltage of each of three or more current carrying conductors in a duct, bundle, or cable is 50 volts or more, the amperages of each of those conductors must not exceed the value in table 5 multiplied by the correction factor in note 2 to Table 5 for the number of conductors that carry 50 volts or more.
(c) This section does not apply to communication systems; electronic navigation equipment; resistance conductors that control circuit amperage; conductors in secondary circuits of ignition systems; and pigtails of less than seven inches of exposed length.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977; 42 FR 24739, May 16, 1977, as amended by CGD 80-047 and CGD 80-046, 45 FR 85450, Dec. 29, 1980; CGD 87-009, 53 FR 36972, Sept. 23, 1988]
§ 183.440 Secondary circuits of ignition systems.
(a) Each conductor in a secondary circuit of an ignition system must meet SAE Standard J557.
(b) The connection of each ignition conductor to a spark plug, coil, or distributor must have a tight fitting cap, boot, or nipple.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.445 Conductors: Protection.
(a) Each conductor or group of conductors that passes through a bulkhead, structural member, junction box, or other rigid surface must be protected from abrasion.
(b) Each ungrounded terminal or stud that is continuously energized must meet § 183.455 or must have a boot, nipple, cap, cover, or shield that prevents accidental short-circuiting at the terminals or studs.
[CGD 81-092, 48 FR 55736, Dec. 15, 1983]
§ 183.455 Overcurrent protection: General.
(a) Each ungrounded current-carrying conductor must be protected by a manually reset, tripfree circuit breaker or fuse.
(b) A manually reset, trip-free circuit breaker or fuse must be placed at the source of power for each circuit or conductor except:
(1) If it is physically impractical to place the circuit breaker or fuse at the source of power, it may be placed within seven inches of the source of power for each circuit or conductor measured along the conductor.
(2) If it is physically impractical to place the circuit breaker or fuse at or within seven inches of the source of power, it may be placed within 40 inches of the source of power for each circuit or conductor, measured along the conductor, if the conductor is contained throughout its entire distance between the source of power and the required circuit breaker or fuse in a sheath or enclosure such as a junction box, control box, or enclosed panel.
(c) The current rating of each circuit breaker or fuse must not exceed:
(1) For circuits of less than 50 volts, 150% of the value of the amperage in Table 5 for the conductor size it is protecting; and
(2) For circuits of 50 volts or more, the value of the amperage in Table 5 for the conductor size it is protecting. If this value does not correspond to a standard size or rated circuit breaker or fuse the next larger size or rated circuit breaker or fuse may be used if it does not exceed 150% of the allowed current capacity of the conductor.
(d) The voltage rating of each circuit breaker or fuse must not be less than the nominal circuit voltage of the circuit it is protecting.
(e) This section does not apply to resistance conductors that control circuit amperage; conductors in secondary circuits of ignition systems; pigtails of less than seven inches of exposed length; and power supply conductors in cranking motor circuits.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by CGD 78-090, 44 FR 68466, Nov. 29, 1979]
§ 183.460 Overcurrent protection: Special applications.
(a) Each ungrounded output conductor from a storage battery must have a manually reset, trip-free circuit breaker or fuse, unless the output conductor is in the main power feed circuit from the battery to an engine cranking motor. The circuit breaker or fuse must be within 72 inches of the battery measured along the conductor, unless, for boats built prior to August 1, 1985, the circuit has a switch that disconnects the battery.
(b) Each ungrounded output conductor from an alternator or generator, except for self-limiting alternators or generators, must have a circuit breaker or fuse that has a current rating that does not exceed 120 percent of the maximum rated current of the alternator or generator at 60 °C.
[CGD 73-217, 42 FR 5944, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55736, Dec. 15, 1983]
Subpart J Fuel Systems
Source: CGD 74-209, 42 FR 5950, Jan. 31, 1977, unless otherwise noted.
244 General
§ 183.501 Applicability.
(a) This subpart applies to all boats that have gasoline engines, except outboard engines, for electrical generation, mechanical power, or propulsion.
(b) [Reserved]
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55736, Dec. 15, 1983; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.505 Definitions.
As used in this subpart:
Flame arrestor means a device or assembly that prevents passage of flame through a fuel vent.
Fuel system means the entire assembly of the fuel fill, vent, tank, and distribution components, including pumps, valves, strainers, carburetors, and filters.
Static floating position means the attitude in which a boat floats in calm water, with each fuel tank filled to its rated capacity, but with no person or item of portable equipment on board.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 85-098, 52 FR 19728, May 27, 1987]
§ 183.507 General.
Each fuel system component on a boat to which this subpart applies must meet the requirements of this subpart unless the component is part of an outboard engine or is part of portable equipment.
245 Equipment Standards
§ 183.510 Fuel tanks.
(a) Each fuel tank in a boat must have been tested by its manufacturer under § 183.580 and not leak when subjected to the pressure marked on the tank label under § 183.514(b)(5).
(b) Each fuel tank must not leak if subjected to the fire test under § 183.590. Leakage is determined by the static pressure test under § 183.580, except that the test pressure must be at least one-fourth PSIG.
(c) Each fuel tank of less than 25 gallons capacity must not leak if tested under § 183.584.
(d) Each fuel tank with a capacity of 25 to 199 gallons must not leak if tested under § 183.586.
(e) Each fuel tank of 200 gallons capacity or more must not leak if tested under §§ 183.586 and 183.588.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55736, Dec. 15, 1983]
§ 183.512 Fuel tanks: Prohibited materials.
(a) A fuel tank must not be constructed from terneplate.
(b) Unless it has an inorganic sacrificial galvanic coating on the inside and outside of the tank, a fuel tank must not be constructed from black iron or carbon steel.
(c) A fuel tank encased in cellular plastic or in fiber reinforced plastic must not be constructed from a ferrous alloy.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977; 42 FR 24739, May 16, 1977]
§ 183.514 Fuel tanks: Labels.
(a) Each fuel tank must have a label that meets the requirements of paragraphs (b) through (d) of this section.
(b) Each label required by paragraph (a) of this section must contain the following information:
(1) Fuel tank manufacturer's name (or logo) and address.
(2) Month (or lot number) and year of manufacture.
(3) Capacity in U.S. gallons.
(4) Material of construction.
(5) The pressure the tank is designed to withstand without leaking.
(6) Model number, if applicable.
(7) The statement, “This tank has been tested under 33 CFR 183.510(a).”
(8) If the tank is tested under § 183.584 at less than 25g vertical accelerations the statement, “Must be installed aft of the boat's half length.”
(c) Each letter and each number on a label must:
(1) Be at least 1/16 inch high and
(2) Contrast with the basic color of the label or be embossed on the label.
(d) Each label must:
(1) Withstand the combined effects of exposure to water, oil, salt spray, direct sunlight, heat, cold, and wear expected in normal operation of the boat, without loss of legibility; and
(2) Resist efforts to remove or alter the information on the label without leaving some obvious sign of such efforts.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55737, Dec. 15, 1983; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.516 Cellular plastic used to encase fuel tanks.
(a) Cellular plastic used to encase metallic fuel tanks must:
(1) Not change volume by more than five percent or dissolve after being immersed in any of the following liquids for 24 hours at 29 °C:
(i) Reference fuel B ASTM D 471 (incorporated by reference, see § 183.5).
(ii) No. 2 reference oil of ASTM D 471 (incorporated by reference, see § 183.5).
(iii) Five percent solution of trisodium phosphate in water; and
(2) Not absorb more than 0.12 pound of water per square foot of cut surface, measure under Military Specification MIL P-21929B.
(b) Non-polyurethane cellular plastic used to encase metallic fuel tanks must have a compressive strength of at least 60 pounds per square inch at ten percent deflection measured under ASTM D 1621 (incorporated by reference, see § 183.5), “Compressive Strength of Rigid Cellular Plastics”.
(c) Polyurethane cellular plastic used to encase metallic fuel tanks must have a density of at least 2.0 pounds per cubic foot, measured under ASTM D 1622 (incorporated by reference, see § 183.5), “Apparent Density of Rigid Cellular Plastics.”
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 77-98, 42 FR 36253, July 14, 1977; CGD 81-092, 48 FR 55737, Dec. 15, 1983; USCG-2000-7223, 65 FR 40059, June 29, 2000]
§ 183.518 Fuel tank openings.
Each opening into the fuel tank must be at or above the topmost surface of the tank.
§ 183.520 Fuel tank vent systems.
(a) Each fuel tank must have a vent system that prevents pressure in the tank from exceeding 80 percent of the pressure marked on the tank label under § 183.514(b)(5).
(b) Each vent must:
(1) Have a flame arrester that can be cleaned unless the vent is itself a flame arrestor; and
(2) Not allow a fuel overflow at the rate of up to two gallons per minute to enter the boat.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 77-98, 42 FR 36253, July 14, 1977]
§ 183.524 Fuel pumps.
(a) Each diaphragm pump must not leak fuel from the pump if the primary diaphragm fails.
(b) Each electrically operated fuel pump must not operate except when the engine is operating or when the engine is started.
(c) If tested under § 183.590, each fuel pump, as installed in the boat, must not leak more than five ounces of fuel in 2 1/2 minutes, inclusive of leaks from fuel line, fuel filter and strainer.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 77-98, 42 FR 36253, July 14, 1977]
§ 183.526 Carburetors.
(a) [Reserved]
(b) Each carburetor must not leak more than five cubic centimeters of fuel in 30 seconds when:
(1) The float valve is open;
(2) The carburetor is at half throttle; and
(3) The engine is cranked without starting; or
(4) The fuel pump is delivering the maximum pressure specified by its manufacturer.
(c) Each updraft and horizontal draft carburetor must have a device that:
(1) Collects and holds fuel that flows out of the carburetor venturi section toward the air intake;
(2) Prevents collected fuel from being carried out of the carburetor assembly by the shock wave of a backfire or by reverse air flow; and
(3) Returns collected fuel to the engine induction system after the engine starts,
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 77-98, 42 FR 36253, July 14, 1977]
§ 183.528 Fuel stop valves.
(a) Each electrically operated fuel stop valve in a fuel line between the fuel tank and the engine must:
(1) Open electrically only when the ignition switch is on; and
(2) Operate manually.
(b) If tested in accordance with the fire test under § 183.590, a fuel stop valve installed in a fuel line system requiring metallic fuel lines or “USCG Type A1” hose must not leak fuel.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 85-098, 52 FR 19728, May 27, 1987]
§ 183.530 Spud, pipe, and hose fitting configuration.
Except when used for a tank fill line, each spud, pipe, or hose fitting used with hose clamps must have:
(a) A bead;
(b) A flare; or
(c) A series of annular grooves or serrations no less than 0.015 inches deep, except a continuous helical thread, knurl, or groove.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.532 Clips, straps, and hose clamps.
(a) Each clip, strap, and hose clamp must:
(1) Be made from a corrosion resistant material; and
(2) Not cut or abrade the fuel line.
(b) If tested in accordance with the fire test under § 183.590, a hose clamp installed on a fuel line system requiring metallic fuel lines or “USCG Type A1” hose must not separate under a one pound tensile force.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 85-098, 52 FR 19728, May 27, 1987]
§ 183.534 Fuel filters and strainers.
If tested under § 183.590, each fuel filter and strainer, as installed in the boat, must not leak more than five ounces of fuel in 2 1/2 minutes inclusive of leaks from the fuel pump and fuel line.
[CGD 77-98, 42 FR 36253, July 14, 1977]
§ 183.536 Seals and gaskets in fuel filters and strainers.
(a) [Reserved]
(b) Each gasket and each sealed joint in a fuel filter and strainer must not leak when subjected for 24 hours to a gasoline that has at least a 50 percent aromatic content at the test pressure marked on the fuel tank label.
[CGD 81-092, 48 FR 55737, Dec. 15, 1983]
§ 183.538 Metallic fuel line materials.
Each metallic fuel line connecting the fuel tank with the fuel inlet connection on the engine must:
(a) Be made of seamless annealed copper, nickel copper, or copper-nickel; and
(b) Except for corrugated flexible fuel line, have a minimum wall thickness of 0.029 inches.
§ 183.540 Hoses: Standards and markings.
(a) “USCG Type A1” hose means hose that meets the performance requirements of:
(1) SAE Standard J1527DEC85, Class 1 and the fire test in § 183.590; or
(2) Underwriters' Laboratories, Inc. (UL) Standard 1114.
(b) “USCG Type A2” hose means hose that meets the performance requirements of SAE Standard J1527DEC85, Class 2 and the fire test in § 183.590;
(c) “USCG Type B1” hose means hose that meets the performance requirements of SAE Standard J1527DEC85, Class 1.
(d) “USCG Type B2” hose means hose that meets the performance requirements of SAE Standard J1527DEC85, Class 2.
Note:
SAE Class 1 hose has a permeation rating of 100 grams or less fuel loss per square meter of interior surface in 24 hours.
SAE Class 2 hose has a permeation rating of 300 grams or less fuel loss per square meter of interior surface in 24 hours.
(e) Each “USCG Type A1,” “USCG Type A2,” “USCG Type B1,” and “USCG Type B2” hose must be identified by the manufacturer by a marking on the hose.
(f) Each marking must contain the following information in English:
(1) The statement “USCG TYPE (insert A1 or A2 or B1 or B2).”
(2) The year in which the hose was manufactured.
(3) The manufacturer's name or registered trademark.
(g) Each character must be block capital letters and numerals that are at least one eighth-inch high.
(h) Each marking must be permanent, legible, and on the outside of the hose at intervals of 12 inches or less.
[CGD 85-098, 52 FR 19728, May 27, 1987]
§ 183.542 Fuel systems.
(a) Each fuel system in a boat must have been tested by the boat manufacturer and not leak when subjected to the greater of the following pressures:
(1) Three pounds per square inch; or
(2) One and one-half times the pressure created in the lowest part of the fuel system when it is filled to the level of overflow with fuel.
(b) The test pressure shall be obtained with air or inert gas.
[CGD 81-092, 48 FR 55737, Dec. 15, 1983]
246 Manufacturer Requirements
§ 183.550 Fuel tanks: Installation.
(a) Each fuel tank must not be integral with any boat structure or mounted on an engine.
(b) Each fuel tank must not move at the mounting surface more than onefourth inch in any direction.
(c) Each fuel tank must not support a deck, bulkhead, or other structural component.
(d) Water must drain from the top surface of each metallic fuel tank when the boat is in its static floating position.
(e) Each fuel tank support, chock, or strap that is not integral with a metallic fuel tank must be insulated from the tank surface by a nonmoisture absorbing material.
(f) Cellular plastic must not be the sole support for a metallic fuel tank.
(g) If cellular plastic is the sole support of a non-metallic fuel tank, the cellular plastic must meet the requirements of § 183.516 (b) or (c).
(h) Each fuel tank labeled under § 183.514(b)(8) for installation aft of the boat's half length must be installed with its center of gravity aft of the boat's half length.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55737, Dec. 15, 1983; USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.552 Plastic encased fuel tanks: Installation.
(a) Each fuel tank encased in cellular plastic foam or in fiber reinforced plastic must have the connections, fittings, and labels accessible for inspection and maintenance.
(b) If a metallic fuel tank is encased in cellular plastic or in fiber reinforced plastic, water must not collect between the plastic and the surface of the tank or be held against the tank by capillary action.
(c) If the plastic is bonded to the surface of a metallic fuel tank, the adhesive strength of the metal to the plastic bond must exceed the cohesive strength of the plastic.
§ 183.554 Fittings, joints, and connections.
Each fuel system fitting, joint, and connection must be arranged so that it can be reached for inspection, removal, or maintenance without removal of permanent boat structure.
§ 183.556 Plugs and fittings.
(a) A fuel system must not have a fitting for draining fuel.
(b) A plug used to service the fuel filter or strainer must have a tapered pipethread or be a screw type fitted with a locking device other than a split lock washer.
§ 183.558 Hoses and connections.
(a) Each hose used between the fuel pump and the carburetor must be “USCG Type A1” hose.
(b) Each hose used—
(1) For a vent line or fill line must be:
(i) “USCG Type A1” or “USCG Type A2”; or
(ii) “USCG Type B1” or “USCG Type B2” if no more than five ounces of fuel is discharged in 2 1/2 minutes when:
(A) The hose is severed at the point where maximum drainage of fuel would occur,
(B) The boat is in its static floating position, and
(C) The fuel system is filled to the capacity market on the tank label under § 183.514(b)(3).
(2) From the fuel tank to the fuel inlet connection on the engine must be:
(i) “USCG Type A1”; or
(ii) “USCG Type B1” if no more than five ounces of fuel is discharged in 2 1/2 minutes when:
(A) The hose is severed at the point where maximum drainage of fuel would occur,
(B) The boat is in its static floating position, and
(C) The fuel system is filled to the capacity marked on the tank label under § 183.514(b)(3).
(c) Each hose must be secured by:
(1) A swaged sleeve;
(2) A sleeve and threaded insert; or
(3) A hose clamp.
(d) The inside diameter of a hose must not exceed the actual minor outside diameter of the connecting spud, pipe, or fitting by more than the distance shown in Table 8.
Table 8
If minor outside diameter of the connecting spud, pipe, or fitting is— | The inside diameter of the hose must not exceed the minor outside diameter of the connecting spud, pipe, or hose fitting by more than the following distance:
Less than 3/8 in | 0.020 in.
3/8 in. to 1 in | 0.035 in.
Greater than 1 in | 0.065 in.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 85-098, 52 FR 19728, May 27, 1987]
§ 183.560 Hose clamps: Installation.
Each hose clamp on a hose from the fuel tank to the fuel inlet connection on the engine, a hose between the fuel pump and the carburetor, or a vent line must:
(a) Be used with hose designed for clamps;
(b) [Reserved]
(c) Be beyond the bead, flare, or over the serrations of the mating spud, pipe, or hose fitting; and
(d) Not depend solely on the spring tension of the clamp for compressive force.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55737, Dec. 15, 1983]
§ 183.562 Metallic fuel lines.
(a) Each metallic fuel line that is mounted to the boat structure must be connected to the engine by a flexible fuel line.
(b) Each metallic fuel line must be attached to the boat's structure within four inches of its connection to a flexible fuel line.
§ 183.564 Fuel tank fill system.
(a) Each fuel fill opening must be located so that a gasoline overflow of up to five gallons per minute for at least five seconds will not enter the boat when the boat is in its static floating position.
(b) Each hose in the tank fill system must be secured to a pipe, spud, or hose fitting by:
(1) A swaged sleeve;
(2) A sleeve and threaded insert; or
(3) Two adjacent metallic hose clamps that do not depend solely on the spring tension of the clamps for compressive force.
(c) Each hose clamp in the tank fill system must be used with a hose designed for clamps.
(d) Hose clamps used in the tank fill system must:
(1) Have a minimum nominal band width of at least one-half inch; and
(2) Be over the hose and the spud, pipe, or hose fitting.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55737, Dec. 15, 1983]
§ 183.566 Fuel pumps: Placement.
Each fuel pump must be on the engine it serves or within 12 inches of the engine, unless it is a fuel pump used to transfer fuel between tanks.
§ 183.568 Anti-siphon protection.
Each fuel line from the fuel tank to the fuel inlet connection on the carburetor must:
(a) Be above the level of the tank top; or
(b) Have an anti-siphon device or an electrically operated fuel stop valve:
(1) At the tank withdrawal fitting; or
(2) Installed so the line from the fuel tank is above the top of the tank; or
(c) Provided that the fuel tank top is below the level of the carburetor inlet, be metallic fuel lines meeting the construction requirements of § 183.538 or “USCG Type A1” hose, with one or two manual shutoff valves installed as follows:
(1) Directly at the fuel tank connection arranged to be readily accessible for operation from outside of the compartment, and
(2) If the length of fuel line from the tank outlet to the engine inlet is greater than 12 feet, a manual shutoff valve shall be installed at the fuel inlet connection to the engine.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55737, Dec. 15, 1983; CGD 85-098, 52 FR 19729, May 27, 1987]
§ 183.570 Fuel filters and strainers: Installation.
Each fuel filter and strainer must be supported on the engine or boat structure independent from its fuel line connections, unless the fuel filter or strainer is inside a fuel tank.
§ 183.572 Grounding.
Each metallic component of the fuel fill system and fuel tank which is in contact with fuel must be statically grounded so that the resistance between the ground and each metallic component of the fuel fill system and fuel tank is less than 100 ohms.
247 Tests
§ 183.580 Static pressure test for fuel tanks.
A fuel tank is tested by performing the following procedures in the following order:
(a) Fill the tank with air or inert gas to the pressure marked on the tank label under § 183.514(b)(5).
(b) Examine each tank fitting and seam for leaks using a leak detection method other than the pressure drop method.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 81-092, 48 FR 55737, Dec. 15, 1983]
§ 183.584 Shock test.
A fuel tank is tested by performing the following procedures in the following order:
(a) Perform the static pressure test under § 183.580.
(b) If the tank is non-metallic, fill it to capacity with a gasoline that has at least a 50 percent aromatic content. Keep the fuel in the tank at 21 °C or higher for 30 days prior to testing.
(c) Mount the tank to the platform of an impact test machine.
(d) Fill the tank to capacity with water.
(e) Apply one of the following accelerations within three inches of the center of the horizontal mounting surface of the tank. The duration of each vertical acceleration pulse is measured at the base of the shock envelope.
(1) If the tank is not labeled under § 183.514(b)(8) for installation aft of the half length of the boat, apply 1000 cycles of 25g vertical accelerations at a rate of 80 cycles or less per minute. The duration of the acceleration pulse must be between 6 and 14 milliseconds.
(2) If the tank is manufactured for installation with its center of gravity aft of the half length of the boat, apply 1000 cycles of 15g vertical accelerations at a rate of 80 cycles or less per minute. The duration of the shock pulse must be between 6 and 14 milliseconds.
(f) Perform the static pressure test under § 183.580.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.586 Pressure impulse test.
A fuel tank is tested by performing the following procedures in the following order:
(a) Perform the static pressure test under § 183.580.
(b) If the tank is non-metallic, fill it to capacity with a gasoline that has at least a 50 percent aromatic content. Keep the fuel in the tank at 21 °C or higher for 30 days prior to testing.
(c) Mount the tank on a test platform.
(d) Fill the tank to capacity with water.
(e) Cap and seal each opening in the tank.
(f) Apply 25,000 cycles of pressure impulse at the rate of no more than 15 impulses per minute varying from zero to three PSIG to zero inside the tank top from a regulated source of air, inert gas, or water.
(g) Perform the static pressure test under § 183.580.
§ 183.588 Slosh test.
A fuel tank is tested by performing the following procedures in the following order:
(a) Perform the static pressure test under § 183.580.
(b) Perform the pressure impulse test under § 183.586.
(c) Secure the tank to the platform of a tank rocker assembly.
(d) Fill the tank to one-half capacity with water.
(e) Cap and seal each opening in the tank.
(f) Apply 500,000 cycles or rocking motion 15 degrees to each side of the tank centerline at the rate of 15 to 20 cycles a minute. The axis of rotation of the rocker and fuel tank must be perpendicular to the centerline of the tank length at a level six inches or less above or below the tank's bottom.
(g) Perform the static pressure test under § 183.580.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.590 Fire test.
(a) A piece of equipment is tested under the following conditions and procedures:
(1) Fuel stop valves, “USCG Type A1” or USCG Type A2” hoses and hose clamps are tested in a fire chamber.
(2) Fuel filters, strainers, and pumps are tested in a fire chamber or as installed on the engine in the boat.
(3) Fuel tanks must be tested filled with fuel to one-fourth the capacity marked on the tank in a fire chamber or in an actual or simulated hull section.
(b) Each fire test is conducted with free burning heptane and the component must be subjected to a flame for 2 1/2 minutes.
(c) If the component is tested in a fire chamber:
(1) The temperature within one inch of the component must be at least 648 °C sometime during the 2 1/2 minute test;
(2) The surface of the heptane must be 8 to 10 inches below the component being tested; and
(3) The heptane must be in a container that is large enough to permit the perimeter of the top surface of the heptane to extend beyond the vertical projection of the perimeter of the component being tested.
(d) If the component is being tested as installed on an engine, heptane sufficient to burn 2 1/2 minutes must be poured over the component and allowed to run into a flat bottomed pan under the engine. The pan must be large enough to permit the perimeter of the top surface of the heptane to extend beyond the vertical projection of the perimeter of the engine.
(e) If a fuel tank is being tested in an actual or simulated hull section, the actual or simulated hull section must be of sufficient size to contain enough heptane to burn for 2 1/2 minutes in a place adjacent to the tank.
[CGD 74-209, 42 FR 5950, Jan. 31, 1977, as amended by CGD 77-98, 42 FR 36253, July 14, 1977; CGD 85-098, 52 FR 19729, May 27, 1987]
Subpart K Ventilation
Source: CGD 76-082, 44 FR 73027, Dec. 17, 1979, unless otherwise noted.
§ 183.601 Applicability.
This subpart applies to all boats that have gasoline engines for electrical generation, mechanical power, or propulsion.
[USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.605 Definitions.
As used in this subpart:
“Fuel” means gasoline.
“Open to the atmosphere” means a compartment that has at least 15 square inches of open area directly exposed to the atmosphere for each cubic foot of net compartment volume.
[CGD 76-082, 44 FR 73027, Dec. 17, 1979, as amended by CGD 85-098, 52 FR 19729, May 27, 1987]
§ 183.607 Incorporation by reference.
(a) The following standards are incorporated by reference. Copies may be obtained from the sources indicated. They are also available for inspection at Coast Guard Headquarters. Contact Commandant (CG-BSX-23), Attn: Recreational Boating Product Assurance Branch, U.S. Coast Guard Stop 7501, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7501. It is also available at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(1) AMCA Standard 210-74, Figure 12. Air Moving and Conditioning Association, 30 West University Drive, Arlington Heights, Illinois 60004.
(2) ASTM Standard D 471. American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.
(3) UL Standard 1128, Underwriters Laboratories, Incorporated, 12 Laboratory Drive, Research Triangle Park, NC 27709-3995.
(b) The Director of the Federal Register approved the incorporation by reference in paragraph (a)(2) on September 26, 1976 and the incorporations in paragraphs (a) (1) and (3) on March 24, 1978.
[CGD 76-082, 44 FR 73027, Dec. 17, 1979, as amended by CGD 82-010, 48 FR 8273, Feb. 28, 1983; USCG-2000-7223, 65 FR 40059, June 29, 2000; 69 FR 18803, Apr. 9, 2004; USCG-2010-0351, 75 FR 36288, June 25, 2010; USCG-2014-0410, 79 FR 38449, July 7, 2014]
§ 183.610 Powered ventilation system.
(a) Each compartment in a boat that has a permanently installed gasoline engine with a cranking motor must:
(1) Be open to the atmosphere, or
(2) Be ventilated by an exhaust blower system.
(b) Each exhaust blower or combination of blowers must be rated at an air flow capacity not less than that computed by the formulas given in Table 183.610, Column 2. Blower rating must be determined according to AMCA Standard 210-74, Figure 12, or UL Standard 1128.
Table 183.610
Col. 1 1 | Col. 2 2 | Col. 3 3
Below 34 | Fr = 50 | Fo = 20
34 to 100 | Fr = 1.5V | Fo = 0.6V
Over 100 | Fr = V/2 + 100 | Fo = 0.2V + 40
1 Net compartment volume of engine compartment and compartments open thereto (V) cubic feet.
2 Rated blower capacity (Fr) cubic feet per minute.
3 Blower system output (Fo) cubic feet per minute.
(c) Each exhaust blower system required by paragraph (a)(2) of this section must exhaust air from the boat at a rate which meets the requirements of Table 183.610, Column 3 when the engine is not operating.
(d) Each intake duct for an exhaust blower must be in the lower one-third of the compartment and above the normal level of accumulated bilge water.
(e) More than one exhaust blower may be used in combination to meet the requirements of this section.
(f) Each boat that is required to have an exhaust blower must have a label that:
(1) Is located as close as practicable to each ignition switch;
(2) Is in plain view of the operator; and
(3) Has at least the following information:
WARNING—GASOLINE VAPORS CAN EXPLODE. BEFORE STARTING ENGINE OPERATE BLOWER FOR 4 MINUTES AND CHECK ENGINE COMPARTMENT BILGE FOR GASOLINE VAPORS.
§ 183.620 Natural ventilation system.
(a) Except for compartments open to the atmosphere, a natural ventilation system that meets the requirements of § 183.630 must be provided for each compartment in a boat that:
(1) Contains a permanently installed gasoline engine;
(2) Has openings between it and a compartment that requires ventilation, where the aggregate area of those openings exceeds 2 percent of the area between the compartments, except as provided in paragraph (c) of this section;
(3) Contains a permanently installed fuel tank and an electrical component that is not ignition protected in accordance with § 183.410(a);
(4) Contains a fuel tank that vents into that compartment; or
(5) Contains a non-metallic fuel tank:
(i) With an aggregate permeability rate exceeding 1.2 grams of fuel loss in 24 hours per cubic foot of net compartment volume, or
(ii) If the net compartment volume is less than one cubic foot, having a permeability rate exceeding 1.2 grams of fuel loss in 24 hours.
Note:
Reference fuel “C” at 40 degrees Celsius plus or minus 2 degrees Celsius from ASTM standard D 471 (incorporated by reference, see § 183.5) is to be used in determining the permeability rate.
(b) Each supply opening required in § 183.630 must be located on the exterior surface of the boat.
(c) An accommodation compartment above a compartment requiring ventilation that is separated from the compartment requiring ventilation by a deck or other structure is excepted from paragraph (a)(2) of this section.
[CGD 76-082, 44 FR 73027, Dec. 17, 1979, as amended by CGD 76-082(a), 46 FR 27645, May 21, 1981; CGD 85-059, 51 FR 37577, Oct. 23, 1986; USCG-1999-5832, 64 FR 34716, June 29, 1999; USCG-1999-5151, 64 FR 67176, Dec. 1, 1999]
§ 183.630 Standards for natural ventilation.
(a) For the purpose of § 183.620, “natural ventilation” means an airflow in a compartment in a boat achieved by having:
(1) A supply opening or duct from the atmosphere or from a ventilated compartment or from a compartment that is open to the atmosphere; and
(2) An exhaust opening into another ventilated compartment or an exhaust duct to the atmosphere.
(b) Each exhaust opening or exhaust duct must originate in the lower third of the compartment.
(c) Each supply opening or supply duct and each exhaust opening or exhaust duct in a compartment must be above the normal accumulation of bilge water.
(d) Except as provided in paragraph (e) of this section, supply openings or supply ducts and exhaust openings or exhaust ducts must each have a minimum aggregate internal cross-sectional area calculated as follows:
A = 5 ln (V/5);
where:
(1) A is the minimum aggregate internal cross-sectional area of the openings or ducts in square inches;
(2) V is the net compartment volume in cubic feet, including the net volume of other compartments connected by openings that exceed 2 percent of the area between the compartments; and
(3) ln (V/5) is the natural logarithm of the quantity (V/5).
(e) The minimum internal cross-sectional area of each supply opening or duct and exhaust opening or duct must exceed 3.0 square inches.
(f) The minimum internal cross-sectional area of terminal fittings for flexible ventilation ducts installed to meet the requirements of paragraph (d) of this section must not be less than 80 percent of the required internal cross-sectional area of the flexible ventilation duct.
[CGD 76-082, 44 FR 73027, Dec. 17, 1979; 45 FR 7544, Feb. 4, 1980]
Subpart L Start-in-Gear Protection
Source: CGD 79-137, 46 FR 3515, Jan. 15, 1981, unless otherwise noted.
§ 183.701 Applicability.
This subpart applies to outboard motors and starting controls, and to manufacturers, distributors or dealers installing such equipment.
[USCG-1999-5832, 64 FR 34716, June 29, 1999]
§ 183.705 Definitions.
For the purposes of this subpart:
(a) Outboard motor means a self-contained propulsion system of any horsepower rating designed to be installed on, and removable from the transom of a boat.
(b) Static thrust means the forward or backward thrust developed by an outboard motor and associated propulsion unit while stationary.
(c) Starting control means the motor throttle, shift and starting control mechanisms located at a position remote from the outboard motor.
(d) Local starting means operating a mechanical or electrical starting device built into the outboard motor.
(e) Distributor means any person engaged in the sale and distribution of boats or associated equipment for the purpose of resale.
(f) Dealer means any person who is engaged in the sale and distribution of boats or associated equipment to purchasers who the seller in good faith believes to be purchasing any such boat or associated equipment for purposes other than resale.
§ 183.710 Start-in-gear protection required.
(a) Any outboard motor which is capable of developing a static thrust of 115 pounds or more at any motor operating speed with any propeller or jet attachment recommended for or shipped with the motor by the manufacturer, must be equipped with a device to prevent the motor being started when controls are set so as to attain that thrust level, as follows:
(1) Outboard motors designed for local starting must have a built-in start-in-gear protection device.
(2) Outboard motors designed for remote starting must have either a built-in start-in-gear protection device or be installed with remote starting controls containing this device. An outboard motor designed for remote starting that does not have a built-in start-in-gear protection device must, at the time of sale, have a tag or label attached at the location of the control connection, containing the following information: “Starting controls installed with this motor must comply with USCG requirements for start-in-gear protection in 33 CFR Part 183, Subpart L.” The letters and numbers on the tag or label must be at least 1/8 inch high.
(b) Starting controls must have a tag or label with the following information to indicate whether or not they have been equipped with a start-in-gear protection device: “This control will (or will not) provide start-in-gear protection meeting USCG requirements of 33 CFR Part 183, Subpart L.” The letters and numbers on the tag or label must be at least 1/8 inch high.
(c) Any manufacturer, distributor or dealer installing an outboard motor displaying the label described in paragraph (a)(2) of this section must properly match it with a compatible starting control that contains a start-in-gear protection device.
§ 183.715 Exception.
Outboard motors designed to be equipped for remote starting, but which also have a provision for local starting in emergencies, need not comply with § 183.710 for their local starting system. However, the following information must be displayed on the motor: “Warning—Ensure shift control is in neutral before starting motor”. This information must be clearly visible to a person using the emergency starting device.
Subpart M Navigation Lights
Source: USCG-1999-6580, 66 FR 55091, Nov. 1, 2001, unless otherwise noted.
§ 183.801 Applicability.
This subpart applies to recreational vessel manufacturers, distributors, and dealers installing such equipment in new recreational vessels constructed after November 1, 2002.
§ 183.803 Definitions.
As used in this subpart:
Dealer means any person who is engaged in the sale and distribution of recreational vessels to purchasers who the seller in good faith believes to be purchasing any such recreational vessel for purposes other than resale.
Distributor means any person engaged in the sale and distribution of recreational vessels for the purpose of resale.
Manufacturer means any person engaged in:
(1) The manufacture, construction, or assembly of recreational vessels, or
(2) The importation of recreational vessels into the United States for subsequent sale.
Navigation lights are those lights prescribed by the Navigation Rules (COLREGS and their associated Annexes and Inland Navigation Rules (33 CFR subchapter E) to indicate a vessel's presence, type, operation, and relative heading.
[USCG-1999-6580, 66 FR 55091, Nov. 1, 2001, as amended by USCG-2015-0433, 80 FR 44287, July 27, 2015]
§ 183.810 Navigation light certification requirements.
(a) Except as provided by paragraph (b) of this section, each navigation light must—
(1) Meet the technical standards of the applicable Navigation Rules;
(2) Be certified by a laboratory listed by the Coast Guard to the standards of ABYC A-16 (incorporated by reference, see § 183.5) or equivalent, although portable battery-powered lights need only meet the requirements of the standard applicable to them; and
(3) Bear a permanent and indelible label that is visible without removing or disassembling the light and that states the following:
(i) “USCG Approval 33 CFR 183.810.”
(ii) “MEETS______.” (Insert the identification name or number of the standard under paragraph (a)(2) of this section, to which the laboratory type-tested.)
(iii) “TESTED BY______.” (Insert the name or registered certification-mark of the laboratory listed by the Coast Guard that tested the fixture to the standard under paragraph (a)(2) of this section.)
(iv) Name of manufacturer.
(v) Number of model.
(vi) Visibility of the light in nautical miles.
(vii) Date on which the light was type-tested.
(viii) Identification and specifications of the bulb used in the compliance test.
(b) If a light is too small to attach the required label—
(1) Place the information from the label in or on the package that contains the light; and
(2) Mark each light “USCG” followed by the certified range of visibility in nautical miles (nm), for example, “USCG 2nm”. Once installed, this mark must be visible without removing the light.
N Subpart N [Reserved]
184-186 PARTS 184-186 [RESERVED]
PART 187 VESSEL IDENTIFICATION SYSTEM
Authority: 46 U.S.C. 2103, 12501, 31322; DHS Delegation No. 00170.1, Revision No. 01.2, paragraph (II)(92).
Source: USCG-1999-6420, 66 FR 15630, Mar. 20, 2001, unless otherwise noted.
Subpart A General
§ 187.1 Which States are affected by this part?
States electing to participate in the Vessel Identification System (VIS) are affected by this part.
§ 187.3 What vessels are affected by this part?
Only vessels numbered or titled by a participating State are affected by this part. Vessels documented under 46 U.S.C. chapter 121 and 46 CFR parts 67 and 68 are not affected.
§ 187.5 What are the purposes of this part?
The purposes of this part are to—
(a) Establish minimum requirements for States electing to participate in VIS;
(b) Prescribe guidelines for State vessel titling systems; and
(c) Explain how to obtain certification of compliance with State guidelines for vessel titling systems for the purpose of conferring preferred status on mortgages, instruments, or agreements under 46 U.S.C. 31322(d).
§ 187.7 Definitions.
As used in this part—
Approved numbering system means a numbering system approved by the Secretary of the Department of Homeland Security under 46 U.S.C. Chapter 123.
Barge means a vessel that is not self-propelled or fitted for propulsion by sail, paddle, oar, or similar device.
Builder's certificate means a certificate of the facts of build of a vessel described in 46 CFR 67.99.
Buyer means a person who buys or contracts to buy a vessel.
Cancel, with respect to a certificate of title, means to make the certificate ineffective.
Certificate of documentation means Coast Guard Form CG-1270.
Certificate of origin means a record created by a manufacturer or importer as the manufacturer's or importer's proof of identity of a vessel, and includes a manufacturer's certificate or statement of origin and an importer's certificate or statement of origin, but excludes a builder's certificate.
Certificate of ownership means Coast Guard Form CG-1330.
Certificate of title means a record, created by the office or by a governmental agency of another State under the law of that State, which is designated as a certificate of title by the office or agency and is evidence of ownership of a vessel.
Commandant means the Commandant of the U.S. Coast Guard or an authorized representative of the Commandant of the U.S. Coast Guard.
Dealer means a person, including a manufacturer, in the business of selling vessels.
Documented vessel means a vessel covered by a certificate of documentation issued pursuant to 46 U.S.C. Section 12105, and excludes a foreign-documented vessel.
Electronic means relating to technology having electrical, digital, magnetic, wireless, optical, electromagnetic, or similar capabilities.
Electronic certificate of title means a certificate of title consisting of information that is stored solely in an electronic medium and is retrievable in perceivable form.
Foreign-documented vessel means a vessel the ownership of which is recorded in a registry maintained by a country other than the United States, identifying each person having an ownership interest in a vessel, and includes a unique alphanumeric designation for the vessel.
Good faith means honesty in fact and the observance of reasonable commercial standards of fair dealing.
Hull damaged means compromised with respect to the integrity of a vessel's hull by a collision, allision, lightning strike, fire, explosion, running aground, or similar occurrence, or the sinking of a vessel in a manner that creates a significant risk to the integrity of the vessel's hull.
Hull identification number or HIN means the alphanumeric designation assigned to a vessel under subpart C of 33 CFR part 181.
Issuing authority means either a State that has an approved numbering system or the Coast Guard in a State that does not have an approved numbering system.
Lien creditor, with respect to a vessel, means—
(1) A creditor that has acquired a lien on the vessel by attachment, levy, or the like;
(2) An assignee for benefit of creditors from the time of assignment;
(3) A trustee in bankruptcy from the date of the filing of the petition; or
(4) A receiver in equity from the time of appointment.
Manufacturer means any person engaged in the business of manufacturing or importing new vessels for the purpose of sale or trade.
Office means the State department or agency that creates certificates of title.
Owner means a person having legal title to a vessel.
Owner of record means the owner indicated in the files of the Office or, if the files indicate more than one owner, the one first indicated.
Participating State means a State certified by the Commandant as meeting the requirements of subpart C of this part.
Person means an individual or any form of legal or commercial entity.
Purchase means to take by any voluntary transaction that creates an interest in a vessel.
Purchaser means a person taking by purchase.
Record means information inscribed on a tangible medium or stored in an electronic or other medium and is retrievable in perceivable form.
Secured party, with respect to a vessel, means a person—
(1) In whose favor a security interest is created or provided for under a security agreement, whether or not any obligation to be secured is outstanding;
(2) Who is a consignor under State law as prescribed by State law related to security interests in goods; or
(3) Who holds a security interest arising under State law related to security interests in goods.
Secured party of record means the secured party whose name is indicated as the name of the secured party in the files of the office or, if the files indicate more than one secured party, the one first indicated.
Security interest means an interest in a vessel that secures payment or performance of an obligation if the interest is created by contract or otherwise as prescribed by state law related to security interests in goods.
Sign means, with present intent to authenticate or adopt a record, to—
(1) Make or adopt a tangible symbol; or
(2) Attach to or logically associate with the record an electronic symbol, sound, or process.
State means a State of the United States, the District of Columbia, American Samoa, Guam, Northern Mariana Islands, Puerto Rico, U.S. Virgin Islands, and any other territory or possession of the United States.
State of principal operation means the State on whose waters a vessel is or will be used, operated, navigated, or employed more than on the waters of any other State during a calendar year.
Title brand means a designation of previous damage, use, or condition that must be indicated on a certificate of title.
Titled vessel means a vessel titled by a State.
Titling authority means a State whose vessel titling system has been certified by the Commandant under subpart D of this part.
Transfer of ownership means a voluntary or involuntary conveyance of an interest in a vessel.
Vessel means every description of watercraft used or capable of being used as a means of transportation on water, except—
(1) A seaplane;
(2) An amphibious vehicle for which a certificate of title is issued pursuant to a state's motor vehicle certificate of title act or a similar statute of another state;
(3) Watercraft that operate only on a permanently fixed, manufactured course and the movement of which is restricted to or guided by means of a mechanical device to which the watercraft is attached or by which the watercraft is controlled;
(4) A stationary floating structure that—
(i) Does not have and is not designed to have a mode of propulsion of its own;
(ii) Is dependent for utilities upon a continuous utility hookup to a source originating on shore; and
(iii) Has a permanent, continuous hookup to a shore side sewage system.
(5) Watercraft owned by the United States, a State, or a foreign government or a political subdivision of any of them; and
(6) Watercraft used solely as a lifeboat on another watercraft.
Vessel Identification System or VIS means a system for collecting information on vessels and vessel ownership as required by 46 U.S.C. 12501.
Vessel number means the alphanumeric designation for a vessel issued pursuant to 46 U.S.C. 12301.
Written certificate of title means a certificate of title consisting of information inscribed on a tangible medium.
[87 FR 34190, June 6, 2022]
§ 187.9 What is a vessel identifier and how is one assigned?
(a) The vessel identifier for a vessel having a valid HIN is the HIN.
(b) If a vessel does not have a valid HIN, a vessel identifier is assigned under the following table:
Table 187.9(b)—Vessel Identifier Assignments
If the vessel is: | And does not have a valid HIN: | Then the vessel identifier is:
(1) Documented | The official number assigned by the Coast Guard under 46 CFR part 67.
(2) Documented | And is transferred to a new owner | The HIN assigned by the Coast Guard.
(3) Undocumented | And must be numbered under 33 CFR parts 173 and 174 | The number issued on a certificate of number by the issuing authority of the State of principal operation, provided the number will not be used in the future to identify a different vessel.
(4) Undocumented | And is transferred to a new owner | The HIN assigned by the issuing authority of the State of principal operation.
(5) Undocumented | And the vessel is required to be numbered or titled in a new State of principal operation | The HIN assigned by the issuing authority of the State of principal operation.
§ 187.11 What are the procedures to participate in VIS?
(a) A State wanting to participate in VIS must inform the Commandant in writing, describing its willingness and ability to comply with each requirement of § 187.201 of this part. If the Commandant is satisfied that the State will comply fully with § 187.201 of this part, the State will be allowed to participate in VIS and will be listed in appendix A to this part, for as long as the Commandant determines that the State complies fully with § 187.201 of this part.
(b) A State wanting to participate in VIS but unable to comply with one or more requirements of § 187.201 of this part may participate in VIS under one or more waivers, for good cause shown. For purposes of this section, “good cause” includes the existence of State law prohibiting full compliance. A State wanting to participate in VIS under one or more waivers must—
(1) Inform the Commandant in writing;
(2) Describe the requirement or requirements for which waiver is sought and the good cause for noncompliance; and
(3) Describe the steps the State intends to take to remove the good cause and the anticipated time needed to do so.
(c) The Commandant may allow a State to participate in VIS under one or more waivers, pursuant to a memorandum of agreement between the Coast Guard and the State.
(1) The memorandum of agreement recites the information provided by the State under paragraph (b) of this section and is valid for not more than 3 years, during which time the State will be deemed to participate in VIS and be listed in appendix A to this part.
(2) The State may withdraw from the memorandum of agreement and participation in VIS upon written notice to the Commandant. The Commandant may terminate the memorandum of agreement and the State's participation in VIS for non-compliance with the terms of the memorandum.
(3) Participation in VIS under one or more waivers beyond the term of the initial memorandum of agreement requires a new memorandum.
(4) If the good cause for waivers is eliminated within the term of the memorandum of agreement, the State may so inform the Commandant in writing. The Commandant may then consider the State to participate in VIS under paragraph (a) of this section.
[USCG-2003-14963, 77 FR 18703, Mar. 28, 2012]
§ 187.13 What are the procedures for obtaining certification of compliance with guidelines for State vessel titling systems?
(a) A State must submit a written request to the Commandant (CG-5422). The request must include a copy of the State's titling laws, regulations and administrative procedures, and certify that the State will comply with the VIS participation requirements in subpart C of this part.
(b) The Commandant will review the request and determine if the State is complying with the Guidelines for State Vessel Titling Systems in subpart D of this part. If the State is complying with the guidelines, the Commandant will certify compliance and list the State in appendix B to this part.
(c) Appendix B to this part will list States certified by the Commandant. When the Commandant determines that a State is not complying with the vessel titling guidelines, it will lose its certification and be deleted from appendix B to this part.
[USCG-1999-6420, 66 FR 15630, Mar. 20, 2001, as amended by USCG-2008-0179, 73 FR 35024, June 19, 2008]
§ 187.15 When is a mortgage a preferred mortgage?
A mortgage, instrument, or agreement granting a security interest perfected under State law covering the whole of a vessel titled under the law of a participating State is a preferred mortgage if the State is certified under § 187.13.
Subpart B Information to be Collected by Participating States
§ 187.101 What information must be collected to identify a vessel owner?
(a) A participating State must collect the following information for a vessel it has numbered or titled when an individual owns the vessel and make it available to VIS:
(1) Names of all owners.
(2) Principal residence of one owner.
(3) Mailing Address, if different from the address in paragraph (a)(2) of this section.
(4) Owner identifier, which must be the owner's tax identification number, date of birth together with driver's license number, or date of birth together with other unique number.
(b) A participating State must collect the following information for a vessel that it has numbered or titled when the vessel's owner is not an individual, but a business or other type of organization:
(1) Names of all businesses or organizations that own the vessel.
(2) Principal address of one business or organization.
(3) Mailing address, if different from the address in paragraph (b)(2) of this section.
(4) Taxpayer Identification Number (TIN) for the principal business or organization.
(5) If the TIN for the principal business or organization is not available, one of the following unique identifiers for a corporate officer, a partner, or the individual who signed the application for numbering:
(i) Owner identifier, which must be the owner's tax identification number, date of birth together with driver's license number, or date of birth together with other unique number.
(ii) [Reserved]
[USCG-1999-6420, 66 FR 15630, Mar. 20, 2001, as amended by USCG-2003-14963, 77 FR 18703, Mar. 28, 2012]
§ 187.103 What information must be collected to identify a vessel?
A participating State must collect the following information on a vessel it has numbered or titled and make it available to VIS:
(a) Manufacturer's hull identification number, if any.
(b) Official number, if any, assigned by the Coast Guard or its predecessor.
(c) Number on certificate of number assigned by the issuing authority of the State.
(d) Expiration date of certificate of number.
(e) Number previously issued by an issuing authority.
(f) Make and model of vessel.
(g) Model year.
(h) Overall length of vessel.
(i) Vessel type: Authorized terms are “air boat”, “auxiliary sail”, “cabin motorboat”, “houseboat”, “inflatable boat”, “open motorboat”, “paddlecraft”, “personal watercraft”, “pontoon boat”, “rowboat”, “sail only”, or “other”.
(j) Hull material: Authorized terms are “aluminum”, “fiberglass”, “plastic”, “rubber/vinyl/canvas”, “steel”, “wood”, or “other”.
(k) Propulsion type: Authorized terms are “air thrust”, “manual”, “propeller”, “sail”, “water jet”, or “other”.
(l) Engine drive type: Authorized terms are “inboard”, “outboard”, “pod drive”, “sterndrive”, or ”other”.
(m) Fuel: Authorized terms are “electric”, “diesel”, “gas”, or “other”.
(n) Primary operation: Authorized terms are, “charter fishing”, “commercial fishing”, “commercial passenger carrying”, “dealer or manufacturer demonstration”, “other commercial operation”, “pleasure”, or “rent or lease”.
[USCG-2003-14963, 77 FR 18704, Mar. 28, 2012]
§ 187.105 What information on titled vessels must be collected and what may be collected?
(a) A participating State must collect the following information on a vessel it has titled and make it available to VIS:
(1) Information required under § 187.103.
(2) Title number.
(3) Issuance date of the most recently issued title or redundant.
(4) Where evidence may be found on the security interest or lien against the vessel.
(5) Name of each secured party.
(6) Address (city and State) of each secured party.
(b) A participating State may collect the following information on a vessel it has titled and make it available to VIS:
(1) Information concerning the discharge of the security interest.
(2) Information concerning the surrender of the certificate of title.
§ 187.107 What information must be made available to assist law enforcement officials and what information may be made available?
(a) A participating State must make the following information available to VIS for use by law enforcement officials:
(1) Vessel identifier(s), as required by § 187.9.
(2) Notice of law enforcement status. Authorized terms are “lost”, “stolen”, “destroyed”, “abandoned”, or “recovered”.
(3) Date of notice of law enforcement status.
(4) Point of contact for the agency or official reporting the status.
(5) National Crime Information Center code for the reporting agency or official.
(b) A participating State may make the following information available to law enforcement officials:
(1) Notice that the vessel is being sought for a law enforcement purpose other than a purpose listed in paragraph (a)(2) of this section.
(2) Location of vessel when reported lost, stolen, destroyed, abandoned, or recovered.
(3) Vessel insurance policy number.
(4) Name of insurance company.
(5) Address of insurance company.
(6) Mailing address of insurance company, if different from the address in paragraph (b)(5) of this section.
(7) Telephone number of insurance company.
(8) Date the vessel was recovered.
(9) Location of the vessel when recovered.
(10) Names and telephone numbers of contacts not listed under paragraph (a)(4) of this section.
(11) Request to be notified if vessel is sighted.
(12) Purpose of sighting notification request.
(13) Date and time vessel last sighted.
(14) Location of vessel when last sighted.
Subpart C Requirements for Participating in VIS
§ 187.201 What are the compliance requirements for a participating State?
A participating State must comply with the following requirements:
(a) Collect the required information listed in subpart B of this part and provide that information to VIS under the applicable Coast Guard-State Memorandum of Agreement.
(b) Obtain specific evidence of ownership, such as the COO or current certificate of title and/or number, to identify a vessel's owner.
(c) Retain previously issued evidence of ownership, such as certificate of number, title, or Certificate of Documentation, and notify the issuing authority or the Coast Guard by mail or electronic message.
(d) Retain information identifying the type of evidence used to establish the accuracy of the information required to be made available to VIS and make it available to the Commandant upon request.
(e) Update the information required to be made available to VIS by providing, within 48 hours, a copy of transactions that enter, modify, or cancel records in the vessel files.
§ 187.203 What are the voluntary provisions for a participating State?
A participating State may—
(a) Provide VIS with the optional information listed in subpart B of this part;
(b) Make available to VIS updated information provided by the vessel owner, government agency, or secured party about a vessel that has been moved to a non-participating State of principal operation; and
(c) Interact with non-participating States to make information available to, or request information from, VIS concerning a vessel or nationwide statistics.
Subpart D State Vessel Titling Systems [Docket No. USCG-2018-0160, 87 FR 34192, June 6, 2022]
§ 187.301 Certification for preferred mortgage status—Eligibility requirements.
The Commandant, under 46 U.S.C. 31322(d)(1)(A) and § 187.13, will certify a State whose vessel titling system meets the requirements of this subpart as eligible to have security interests that are perfected under its law deemed preferred mortgages under 46 U.S.C. 31322. The State must also comply with the VIS participation requirements of § 187.11 and subpart C of this part and make vessel information it collects available to the VIS.
§ 187.302 Terms States must define.
(a) A State must define the terms “certificate of origin”, “dealer”, “documented vessel”, “issuing authority”, “manufacturer”, “owner”, “person”, “secured party”, “security interest”, “titling authority”, and “vessel” substantially as defined in 33 CFR 187.7.
(b) In addition to the definitions in § 187.7, a State must also define the following terms as prescribed by State law related to security interests in goods:
(1) Agreement;
(2) Buyer in ordinary course of business;
(3) Conspicuous;
(4) Consumer goods;
(5) Debtor;
(6) Knowledge;
(7) Lease;
(8) Lessor;
(9) Notice;
(10) Representative;
(11) Sale;
(12) Security agreement;
(13) Seller;
(14) Send; and
(15) Value.
(c) The definitions in § 187.7 and the terms in paragraph (b) of this section do not apply to any State or Federal law governing licensing, numbering, or registration if the same term is used in that law.
§ 187.303 Applicability.
Subject to a savings clause provided under state law, this subpart applies to any transaction, certificate of title, or record relating to a vessel, even if the transaction, certificate of title, or record was entered into or created before the effective date of the State law.
§ 187.304 Titling exclusively in one State.
A State must require that all vessels required to be numbered in the State under 46 U.S.C. Chapter 123 be titled only in that State, if that State issues titles to that class of vessels.
§ 187.305 Law governing vessels covered by certificate of title.
(a) The local law of the State under whose certificate of title a vessel is covered governs all issues relating to the certificate from the time the vessel becomes covered by the certificate until the vessel becomes covered by another certificate or becomes a documented vessel, even if no other relationship exists between the State and the vessel or its owner.
(b) A vessel becomes covered by a certificate of title when an application for the certificate and the applicable fee are delivered to the office in accordance with this subpart or to the governmental agency that creates a certificate in another jurisdiction in accordance with the law of that jurisdiction.
§ 187.306 Certificate of title required.
(a) Except as otherwise provided in paragraphs (b) and (c) of this section, the owner of a vessel must deliver to the office of the State in which the vessel is principally used an application for a certificate of title for the vessel, with the applicable fee, not later than 20 days after the later of—
(1) The date of a transfer of ownership; or
(2) The date the State becomes the State of principal use.
(b) An application for a certificate of title is not required for—
(1) A documented vessel;
(2) A foreign-documented vessel;
(3) A barge;
(4) A vessel before delivery if the vessel is under construction or completed pursuant to contract; or
(5) A vessel held by a dealer for sale or lease.
(c) The office may not issue, transfer, or renew a certificate of number for a vessel issued pursuant to 46 U.S.C. 12301 unless it has created a certificate of title for the vessel or an application for a certificate for the vessel and the applicable fee have been delivered to the office.
§ 187.307 Application for certificate of title.
(a) Except as otherwise provided in §§ 187.310, 187.315, 187.319, 187.320, 187.321, and 187.322, only an owner may apply for a certificate of title.
(b) An application for a certificate of title must be signed by the applicant and contain—
(1) The applicant's name, the street address of the applicant's principal residence, and, if different, the applicant's mailing address;
(2) The name and mailing address of each other owner of the vessel;
(3) The social security number or taxpayer identification number of each owner;
(4) The hull identification number (HIN) for the vessel or, if none, an application for the issuance of a HIN for the vessel;
(5) The vessel number for the vessel or, if none issued by the office, an application for a vessel number;
(6) A description of the vessel as required by the office, which must include—
(i) The official number for the vessel, if any, assigned by the Coast Guard;
(ii) The name of the manufacturer, builder, or maker;
(iii) The model year or the year in which the manufacture or build of the vessel was completed;
(iv) The overall length of the vessel;
(v) The vessel type, as described in 33 CFR 174.19;
(vi) The hull material, as described in 33 CFR 174.19;
(vii) The propulsion type, as described in 33 CFR 174.19;
(viii) The engine drive type, as described in 33 CFR 174.19, if any; and
(ix) The fuel type, as described in 33 CFR 174.19, if any;
(7) An indication of all security interests in the vessel known to the applicant and the name and mailing address of each secured party;
(8) A statement that the vessel is not a documented vessel or a foreign-documented vessel;
(9) Any title brand known to the applicant and, if known, the jurisdiction under whose law the title brand was created;
(10) If the applicant knows that the vessel is hull damaged, a statement that the vessel is hull damaged;
(11) If the application is made in connection with a transfer of ownership, the transferor's name, street address, and, if different, mailing address, the sales price, if any, and the date of the transfer; and
(12) If the vessel was previously registered or titled in another jurisdiction, a statement identifying each jurisdiction known to the applicant in which the vessel was registered or titled.
(c) In addition to the information required by paragraph (b) of this section, an application for a certificate of title may contain an electronic communication address of the owner, transferor, or secured party.
(d) Except as otherwise provided in §§ 187.319, 187.320, 187.321, and 187.322, an application for a certificate of title must be accompanied by a certificate of title signed by the owner shown on the certificate which identifies the applicant as the owner of the vessel, or is accompanied by a record that identifies the applicant as the owner.
(e) If there is no certificate of title as discussed in paragraph (d) of this section, an application for a certificate of title must be accompanied by—
(1) If the vessel was a documented vessel, a record issued by the Coast Guard that shows the vessel is no longer a documented vessel and identifies the applicant as the owner;
(2) If the vessel was a foreign-documented vessel, a record issued by the foreign country which shows the vessel is no longer a foreign-documented vessel and identifies the applicant as the owner; or
(3) In all other cases, a certificate of origin, bill of sale, or other record that to the satisfaction of the office identifies the applicant as the owner.
(f) A record submitted in connection with an application is part of the application and the office must maintain it in its files.
(g) The office may require an application for a certificate of title to be accompanied by payment or evidence of payment of all fees and taxes payable by the applicant under State law if in connection with the application or the acquisition or use of the vessel.
§ 187.308 Creation and cancellation of certificate of title.
(a) Unless an application for a certificate of title is rejected under paragraph (c) or (d) of this section, the office must create a certificate for the vessel in accordance with paragraph (b) of this section not later than 20 days after delivery to it of an application that complies with § 187.307.
(b) If the office creates electronic certificates of title, it must create an electronic certificate unless in the application the secured party of record or, if none, the owner of record, requests that the office create a written certificate.
(c) Except as otherwise provided in paragraph (d) of this section, the office may reject an application for a certificate of title only if—
(1) The application does not comply with § 187.307;
(2) The application does not contain documentation sufficient for the office to determine whether the applicant is entitled to a certificate;
(3) There is a reasonable basis for concluding that the application is fraudulent or issuance of a certificate would facilitate a fraudulent or illegal act; or
(4) The application does not comply with State law.
(d) The office must reject an application for a certificate of title for a vessel that is a documented vessel or a foreign-documented vessel.
(e) The office may cancel a certificate of title created by it only if the office—
(1) Could have rejected the application for the certificate under paragraph (c) of this section;
(2) Is required to cancel the certificate under another provision of this subpart; or
(3) Receives satisfactory evidence that the vessel is a documented vessel or a foreign-documented vessel.
§ 187.309 Content of certificate of title.
(a) A certificate of title must contain—
(1) The date the certificate was created;
(2) The name of the owner of record and, if not all owners are listed, an indication that there are additional owners indicated in the files of the office;
(3) The mailing address of the owner of record;
(4) The hull identification number (HIN);
(5) The information listed in § 187.307(b)(6);
(6) Except as otherwise provided in § 187.315(b), the name and mailing address of the secured party of record, if any, and if not all secured parties are listed, an indication that there are other security interests indicated in the files of the office; and
(7) All title brands indicated in the files of the office covering the vessel, including brands indicated on a certificate created by a governmental agency of another jurisdiction and delivered to the office.
(b) This subpart does not preclude the office from noting on a certificate of title the name and mailing address of a secured party that is not a secured party of record.
(c) For each title brand indicated on a certificate of title, the certificate must identify the jurisdiction under whose law the title brand was created or the jurisdiction that created the certificate on which the title brand was indicated. If the meaning of a title brand is not easily ascertainable or cannot be accommodated on the certificate, the certificate may state: “Previously branded in (insert the jurisdiction under whose law the title brand was created or whose certificate of title previously indicated the title brand).”
(d) If the files of the office indicate that a vessel was previously registered or titled in a foreign country, the office must indicate on the certificate of title that the vessel was registered or titled in that country.
(e) A written certificate of title must contain a form that all owners indicated on the certificate may sign to evidence consent to a transfer of an ownership interest to another person. The form must include a certification, signed under penalty of perjury, that the statements made are true and correct to the best of each owner's knowledge, information, and belief.
(f) A written certificate of title must contain a form for the owner of record to indicate, in connection with a transfer of an ownership interest, that the vessel is hull damaged.
§ 187.310 Title brand.
(a) Unless paragraph (c) of this section applies, at or before the time the owner of record transfers an ownership interest in a hull-damaged vessel that is covered by a certificate of title created by the office, if the damage occurred while that person was an owner of the vessel and the person has notice of the damage at the time of the transfer, the owner must—
(1) Deliver to the office an application for a new certificate that complies with § 187.307 of this part and includes the title brand designation “Hull Damaged”; or
(2) Indicate on the certificate in the place designated for that purpose that the vessel is hull damaged and deliver the certificate to the transferee.
(b) Not later than 20 days after delivery to the office of the application under paragraph (a)(1) of this section or the certificate of title under paragraph (a)(2) of this section, the office must create a new certificate that indicates that the vessel is branded “Hull Damaged”.
(c) Before an insurer transfers an ownership interest in a hull-damaged vessel that is covered by a certificate of title created by the office, the insurer must deliver to the office an application for a new certificate that complies with § 187.306 and includes the title brand designation “Hull Damaged”. Not later than 20 days after delivery of the application to the office, the office must create a new certificate that indicates that the vessel is branded “Hull Damaged”.
(d) An owner of record who fails to comply with paragraph (a) of this section, a person who solicits or colludes in a failure by an owner of record to comply with paragraph (a) of this section, or an insurer that fails to comply with paragraph (c) of this section is subject to penalty as prescribed by state law.
§ 187.311 Maintenance of and access to files.
(a) For each record relating to a certificate of title submitted to the office, the office must—
(1) Ascertain or assign the hull identification number (HIN) for the vessel in accordance with 33 CFR part 181;
(2) Maintain the HIN and all the information submitted with the application pursuant to § 187.307(b) to which the record relates, including the date and time the record was delivered to the office;
(3) Maintain the files for public inspection subject to paragraph (e) of this section; and
(4) Index the files of the office as required by paragraph (b) of this section.
(b) The office must maintain in its files the information contained in all certificates of title created under this subpart. The information in the files of the office must be searchable by the HIN of the vessel, the vessel number, the name of the owner of record, and any other method used by the office.
(c) The office must maintain in its files, for each vessel for which it has created a certificate of title, all title brands known to the office, the name of each secured party known to the office, the name of each person known to the office to be claiming an ownership interest, and all stolen-property reports the office has received.
(d) Upon request, for safety, security, or law-enforcement purposes, the office must provide to Federal, State, or local government the information in its files relating to any vessel for which the office has issued a certificate of title.
(e) Except as otherwise provided by laws of the titling State, the information required under § 187.309 is a public record, but the information provided under § 187.307(b)(3) is not a public record.
§ 187.312 Action required on creation of certificate of title.
(a) On creation of a written certificate of title, the office must promptly send the certificate to the secured party of record or, if none, to the owner of record, at the address indicated for that person in the files of the office. On creation of an electronic certificate of title, the office must promptly send a record evidencing the certificate to the owner of record and, if there is one, to the secured party of record, at the address indicated for that person in the files of the office. The office may send the record to the person's mailing address or, if indicated in the files of the office, an electronic address.
(b) If the office creates a written certificate of title, any electronic certificate of title for the vessel is canceled and replaced by the written certificate. The office must maintain in the files of the office the date and time of cancellation.
(c) Before the office creates an electronic certificate of title, any written certificate for the vessel must be surrendered to the office. If the office creates an electronic certificate, the office must destroy or otherwise cancel the written certificate for the vessel that has been surrendered to the office and maintain in the files of the office the date and time of destruction or other cancellation. If a written certificate being canceled is not destroyed, the office must indicate on the face of the certificate that it has been canceled.
§ 187.313 Effect of certificate of title.
A certificate of title is prima facie evidence of the accuracy of the information in the record that constitutes the certificate.
§ 187.314 Effect of possession of certificate of title; judicial process.
Possession of a certificate of title does not by itself provide a right to obtain possession of a vessel. Garnishment, attachment, levy, replevin, or other judicial process against the certificate is not effective to determine possessory rights to the vessel. This subpart does not prohibit enforcement under State law, other than this subpart (33 CFR part 187 subpart D), of a security interest in, levy on, or foreclosure of a statutory or common-law lien on a vessel. Absence of an indication of a statutory or common-law lien on a certificate does not invalidate the lien.
§ 187.315 Perfection of security interest.
(a) Except as otherwise provided in this section or a savings clause provided under state law, a security interest in a vessel may be perfected only by delivery to the office of an application for a certificate of title that identifies the secured party and otherwise complies with § 187.307. The security interest is perfected on the later of delivery to the office of the application and the applicable fee or attachment of the security interest as prescribed by State law related to security interests in goods.
(b) If the interest of a person named as owner, lessor, consignor, or bailor in an application for a certificate of title delivered to the office is a security interest, the application sufficiently identifies the person as a secured party. Identification on the application for a certificate of a person as owner, lessor, consignor, or bailor is not by itself a factor in determining whether the person's interest is a security interest.
(c) If the office has created a certificate of title for a vessel, a security interest in the vessel may be perfected by delivery to the office of an application, on a form the office may require, to have the security interest added to the certificate. The application must be signed by an owner of the vessel or by the secured party and must include—
(1) The name of the owner of record;
(2) The name and mailing address of the secured party;
(3) The hull identification number (HIN) for the vessel; and
(4) If the office has created a written certificate of title for the vessel, the certificate.
(d) A security interest perfected under paragraph (c) of this section is perfected on the later of delivery to the office of the application and all applicable fees or attachment of the security interest as prescribed by State law related to security interests in goods.
(e) On delivery of an application that complies with paragraph (c) of this section and payment of all applicable fees, the office must create a new certificate of title pursuant to § 187.308 and deliver the new certificate or a record evidencing an electronic certificate pursuant to § 187.312(a). The office must maintain in the files of the office the date and time of delivery of the application to the office.
(f) If a secured party assigns a perfected security interest in a vessel, the receipt by the office of a statement providing the name of the assignee as secured party is not required to continue the perfected status of the security interest against creditors of and transferees from the original debtor. Upon obtaining a release from the secured party indicated in the files of the office or on the certificate, a purchaser of a vessel subject to a security interest takes free of the security interest and of the rights of a transferee unless the transfer is indicated in the files of the office or on the certificate.
(g) This section does not apply to a security interest—
(1) Created in a vessel by a person during any period in which the vessel is inventory held for sale or lease by the person or is leased by the person as lessor if the person is in the business of selling vessels;
(2) In a barge for which no application for a certificate of title has been delivered to the office; or
(3) In a vessel before delivery if the vessel is under construction, or completed, pursuant to contract and for which no application for a certificate has been delivered to the office.
(h) This paragraph applies if a certificate of documentation for a documented vessel is deleted or canceled. If a security interest in the vessel was valid immediately before deletion or cancellation against a third party as a result of compliance with 42 U.S.C. 31321, the security interest is and remains perfected until the earlier of 4 months after cancellation of the certificate or the time the security interest becomes perfected under this subpart.
(i) A security interest in a vessel arising under State law related to security interests in goods is perfected when it attaches but becomes unperfected when the debtor obtains possession of the vessel, unless before the debtor obtains possession the security interest is perfected pursuant to paragraphs (a) or (c) of this section.
(j) A security interest in a vessel as proceeds of other collateral is perfected to the extent provided in State law.
(k) A security interest in a vessel perfected under the law of another jurisdiction is perfected to the extent provided in State law.
§ 187.316 Termination statement.
(a) A secured party indicated in the files of the office as having a security interest in a vessel must deliver a termination statement to the office and, on the debtor's request, to the debtor, by the earlier of—
(1) Twenty days after the secured party receives a signed demand from an owner for a termination statement and there is no obligation secured by the vessel subject to the security interest and no commitment to make an advance, incur an obligation, or otherwise give value secured by the vessel; or
(2) If the vessel is consumer goods, 30 days after there is no obligation secured by the vessel and no commitment to make an advance, incur an obligation, or otherwise give value secured by the vessel.
(b) If a written certificate of title has been created and delivered to a secured party and a termination statement is required under paragraph (a) of this section, the secured party, not later than the date required by paragraph (a), must deliver the certificate to the debtor or to the office with the statement. If the certificate is lost, stolen, mutilated, destroyed, or is otherwise unavailable or illegible, the secured party must deliver with the statement, not later than the date required by paragraph (a), an application for a replacement certificate meeting the requirements of § 187.322.
(c) On delivery to the office of a termination statement authorized by the secured party, the security interest to which the statement relates ceases to be perfected. If the security interest to which the statement relates was indicated on the certificate of title, the office must create a new certificate and deliver the new certificate or a record evidencing an electronic certificate. The office must maintain in its files the date and time of delivery to the office of the statement.
(d) A secured party that fails to comply with this section is liable for any loss that the secured party had reason to know might result from its failure to comply and which could not reasonably have been prevented and for the cost of an application for a certificate of title under § 187.307 or § 187.322.
§ 187.317 Transfer of ownership.
(a) On voluntary transfer of an ownership interest in a vessel covered by a certificate of title, the following rules apply:
(1) If the certificate is a written certificate of title and the transferor's interest is noted on the certificate, the transferor must promptly sign the certificate and deliver it to the transferee. If the transferor does not have possession of the certificate, the person in possession of the certificate has a duty to facilitate the transferor's compliance with this paragraph. A secured party does not have a duty to facilitate the transferor's compliance with this paragraph if the proposed transfer is prohibited by the security agreement.
(2) If the certificate of title is an electronic certificate of title, the transferor must promptly sign and deliver to the transferee a record evidencing the transfer of ownership to the transferee.
(3) The transferee has a right enforceable by specific performance to require the transferor comply with paragraph (a)(1) or (2) of this section.
(b) The creation of a certificate of title identifying the transferee as owner of record satisfies paragraph (a) of this section.
(c) A failure to comply with paragraph (a) or to apply for a new certificate of title does not render a transfer of ownership of a vessel ineffective between the parties. Except as otherwise provided in § 187.318, § 187.319, § 187.323(a), or § 187.324, a transfer of ownership without compliance with paragraph (a) of this section is not effective against another person claiming an interest in the vessel.
(d) A transferor that complies with paragraph (a) of this section is not liable as owner of the vessel for an event occurring after the transfer, regardless of whether the transferee applies for a new certificate of title.
§ 187.318 Effect of missing or incorrect information.
Except as otherwise provided as prescribed by State law related to security interests in goods, a certificate of title or other record required or authorized by this subpart is effective even if it contains incorrect information or does not contain required information.
§ 187.319 Transfer of ownership by secured party's transfer statement.
(a) In this section, “secured party's transfer statement” means a record signed by the secured party of record stating—
(1) That there has been a default on an obligation secured by the vessel;
(2) The secured party of record is exercising or has exercised post-default remedies with respect to the vessel;
(3) By reason of the exercise, the secured party of record has the right to transfer the ownership interest of an owner, and the name of the owner;
(4) The name and last known mailing address of the owner of record and the secured party of record;
(5) The name of the transferee;
(6) Other information required by § 187.307(b); and
(7) One of the following:
(i) The certificate of title is an electronic certificate;
(ii) The secured party does not have possession of the written certificate of title created in the name of the owner of record; or
(iii) The secured party is delivering the written certificate of title to the office with the secured party's transfer statement.
(b) Unless the office rejects a secured party's transfer statement for a reason stated in § 187.308(c), not later than 20 days after delivery to the office of the statement and payment of fees and taxes payable under State law in connection with the statement or the acquisition or use of the vessel, the office must—
(1) Accept the statement;
(2) Amend the files of the office to reflect the transfer; and
(3) If the name of the owner whose ownership interest is being transferred is indicated on the certificate of title—
(i) Cancel the certificate even if the certificate has not been delivered to the office;
(ii) Create a new certificate indicating the transferee as owner; and
(iii) Deliver the new certificate or a record evidencing an electronic certificate.
(c) An application under paragraph (a) of this section or the creation of a certificate of title under paragraph (b) of this section is not by itself a disposition of the vessel and does not by itself relieve the secured party of its duties under State law.
§ 187.320 Transfer by operation of law.
(a) In this section—
(1) “By operation of law” means pursuant to a law or judicial order affecting ownership of a vessel—
(i) Because of death, divorce or other family law proceeding, merger, consolidation, dissolution, or bankruptcy;
(ii) Through the exercise of the rights of a lien creditor or a person having a lien created by statute or rule of law; or
(iii) Through other legal process.
(2) “Transfer-by-law statement” means a record signed by a transferee stating that by operation of law the transferee has acquired or has the right to acquire an ownership interest in a vessel.
(b) A transfer-by-law statement must contain—
(1) The name and last known mailing address of the owner of record and the transferee and the other information required by § 187.307(b);
(2) Documentation sufficient to establish the transferee's ownership interest or right to acquire the ownership interest;
(3) A statement that—
(i) The certificate of title is an electronic certificate of title;
(ii) The transferee does not have possession of the written certificate of title created in the name of the owner of record; or
(ii) The transferee is delivering the written certificate to the office with the transfer-by-law statement; and
(4) Except for a transfer described in paragraph (a)(1)(i) of this section, evidence that notification of the transfer and the intent to file the transfer-by-law statement has been sent to all persons indicated in the files of the office as having an interest, including a security interest, in the vessel.
(c) Unless the office rejects a transfer-by-law statement for a reason stated in § 187.308(c) or because the statement does not include documentation satisfactory to the office as to the transferee's ownership interest or right to acquire the ownership interest, not later than 20 days after delivery to the office of the statement and payment of fees and taxes payable under State law in connection with the statement or with the acquisition or use of the vessel, the office must—
(1) Accept the statement;
(2) Amend the files of the office to reflect the transfer; and
(3) If the name of the owner whose ownership interest is being transferred is indicated on the certificate of title—
(i) Cancel the certificate even if the certificate has not been delivered to the office;
(ii) Create a new certificate indicating the transferee as owner;
(iii) Indicate on the new certificate any security interest indicated on the canceled certificate, unless a court order provides otherwise; and
(iv) Deliver the new certificate or a record evidencing an electronic certificate.
(d) This section does not apply to a transfer of an interest in a vessel by a secured party as prescribed by State law related to security interests in goods.
§ 187.321 Application for transfer of ownership or termination of security interest without certificate of title.
(a) Except as otherwise provided in §§ 187.319 and 187.320, if the office receives, unaccompanied by a signed certificate of title, an application for a new certificate that includes an indication of a transfer of ownership or a termination statement, the office may create a new certificate under this section only if—
(1) All other requirements under §§ 187.307 and 187.308 are met;
(2) The applicant provides an affidavit stating facts showing that the applicant is entitled to a transfer of ownership or termination statement;
(3) The applicant provides the office with satisfactory evidence that notification of the application has been sent to the owner of record and all persons indicated in the files of the office as having an interest, including a security interest, in the vessel, at least 45 days have passed since the notification was sent, and the office has not received an objection from any of those persons; and
(4) The applicant submits any other information required by the office as evidence of the applicant's ownership or right to terminate the security interest, and the office has no credible information indicating theft, fraud, or an undisclosed or unsatisfied security interest, lien, or other claim to an interest in the vessel.
(b) The office may indicate in a certificate of title created under paragraph (a) of this section that the certificate was created without submission of a signed certificate or termination statement. Unless credible information indicating theft, fraud, or an undisclosed or unsatisfied security interest, lien, or other claim to an interest in the vessel is delivered to the office not later than 1 year after creation of the certificate, on request in a form and manner required by the office, the office must remove the indication from the certificate.
§ 187.322 Replacement certificate of title.
(a) If a written certificate of title is lost, stolen, mutilated, destroyed, or otherwise becomes unavailable or illegible, the secured party of record or, if no secured party is indicated in the files of the office, the owner of record may apply for and, by furnishing information satisfactory to the office, obtain a replacement certificate in the name of the owner of record.
(b) An applicant for a replacement certificate of title must sign the application, and, except as otherwise permitted by the office, the application must comply with § 187.307. The application must include the existing certificate unless the certificate is lost, stolen, mutilated, destroyed, or otherwise unavailable.
(c) A replacement certificate of title created by the office must comply with § 187.309 and indicate on the face of the certificate that it is a replacement certificate.
(d) If a person receiving a replacement certificate of title subsequently obtains possession of the original written certificate, the person must promptly destroy the original certificate of title.
§ 187.323 Rights of purchaser other than secured party.
(a) A buyer in ordinary course of business has the protections afforded by State law even if an existing certificate of title was not signed and delivered to the buyer or a new certificate listing the buyer as owner of record was not created.
(b) Except as otherwise provided in §§ 187.317 and 187.324, the rights of a purchaser of a vessel who is not a buyer in ordinary course of business or a lien creditor are governed by State law.
§ 187.324 Rights of secured party.
(a) Subject to paragraph (b) of this section, the effect of perfection and non-perfection of a security interest and the priority of a perfected or unperfected security interest with respect to the rights of a purchaser or creditor, including a lien creditor, is governed by State law.
(b) If, while a security interest in a vessel is perfected by any method under this subpart, the office creates a certificate of title that does not indicate that the vessel is subject to the security interest or contain a statement that it may be subject to security interests not indicated on the certificate—
(1) A buyer of the vessel, other than a person in the business of selling or leasing vessels of that kind, takes free of the security interest if the buyer, acting in good faith and without knowledge of the security interest, gives value and receives possession of the vessel; and
(2) The security interest is subordinate to a conflicting security interest in the vessel that is perfected under § 187.315 after creation of the certificate and without the conflicting secured party's knowledge of the security interest.
§ 187.325 Duties and operation of office.
(a) The office must retain the evidence used to establish the accuracy of the information in its files relating to the current ownership of a vessel and the information on the certificate of title.
(b) The office must retain in its files all information regarding a security interest in a vessel for at least 10 years after the office receives a termination statement regarding the security interest. The information must be accessible by the hull identification number (HIN) for the vessel and any other methods provided by the office.
(c) If a person submits a record to the office, or submits information that is accepted by the office, and requests an acknowledgment of the filing or submission, the office must send to the person an acknowledgment showing the HIN of the vessel to which the record or submission relates, the information in the filed record or submission, and the date and time the record was received or the submission accepted. A request under this section must contain the HIN and be delivered by means authorized by the office.
(d) The office must send or otherwise make available in a record the following information to any person that requests it and pays the applicable fee:
(1) Whether the files of the office indicate, as of a date and time specified by the office, but not a date earlier than 3 days before the office received the request, any certificate of title, security interest, termination statement, or title brand that relates to a vessel—
(i) Identified by a HIN designated in the request;
(ii) Identified by a vessel number designated in the request; or
(iii) Owned by a person designated in the request.
(2) With respect to the vessel—
(i) The name and address of any owner as indicated in the files of the office or on the certificate of title;
(ii) The name and address of any secured party as indicated in the files of the office or on the certificate, and the effective date of the information; and
(iii) A copy of any termination statement indicated in the files of the office and the effective date of the termination statement.
(3) With respect to the vessel, a copy of any certificate of origin, secured party transfer statement, transfer-by-law statement under § 187.320, and other evidence of previous or current transfers of ownership.
(e) In responding to a request under this section, the office may provide the requested information in any medium. On request, the office must send the requested information in a record that is in keeping with State rules of evidence.
0
Appendix A to Part 187 Participating Authorities
The following States comply with the requirements for participating in VIS:
[Reserved]
Appendix B to Part 187 Participating and Certified Titling Authorities
The following States comply with the requirements for participating in VIS and have a certified titling system: [Reserved]
188-199 PARTS 188-199 [RESERVED]
CHAPTER II CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE
200-202 PARTS 200-202 [RESERVED]
PART 203 EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES
Authority: 33 U.S.C. 701n.
Source: 68 FR 19359, Apr. 21, 2003, unless otherwise noted.
Subpart A Introduction
§ 203.11 Purpose.
This part prescribes administrative policies, guidance, and operating procedures for natural disaster preparedness, response, and recovery activities of the United States Army Corps of Engineers.
§ 203.12 Authority.
Section 5 of the Flood Control Act of 1941, as amended, (33 U.S.C. 701n) (69 Stat. 186), commonly and hereinafter referred to as Public Law 84-99, authorizes an emergency fund to be expended at the discretion of the Chief of Engineers for: preparation for natural disasters; flood fighting and rescue operations; repair or restoration of flood control works threatened, damaged, or destroyed by flood, or nonstructural alternatives thereto; emergency protection of federally authorized hurricane or shore protection projects which are threatened, when such protection is warranted to protect against imminent and substantial loss to life and property; and repair and restoration of federally authorized hurricane or shore protection projects damaged or destroyed by wind, wave, or water of other than ordinary nature. The law includes provision of emergency supplies of clean water when a contaminated source threatens the public health and welfare of a locality, and activities necessary to protect life and improved property from a threat resulting from a major flood or coastal storm. This law authorizes the Secretary of the Army (Secretary) to construct wells and to transport water within areas determined by the Secretary to be drought-distressed. The Secretary of the Army has delegated the authority vested in the Secretary under Public Law 84-99 through the Assistant Secretary of the Army (Civil Works) to the Chief of Engineers, subject to such further direction as the Secretary may provide.
§ 203.13 Available assistance.
Corps assistance provided under authority of Public Law 84-99 is intended to be supplemental to State and local efforts. The principal assistance programs and activities of the Corps are described in this section.
(a) Disaster preparedness. Technical assistance for many types of disasters is available to State and local interests. Primary Corps efforts are focused on technical assistance for, and inspections of, flood control works, and related flood fight preparedness and training activities. Technical assistance for specialized studies, project development, and related activities, and requirements for long term assistance, are normally beyond the scope of disaster preparedness assistance, and are appropriately addressed by other Corps authorities and programs. Subpart B addresses disaster preparedness responsibilities and activities.
(b) Emergency operations. Emergency operations, consisting of Flood Response (flood fight and rescue operations) and Post Flood Response assistance, may be provided to supplement State and local emergency operations efforts. Subpart C of this part addresses emergency operations assistance.
(c) Rehabilitation. The Corps may rehabilitate flood control works damaged or destroyed by floods and coastal storms. The Corps Rehabilitation and Inspection Program (RIP) incorporates both disaster preparedness activities and Rehabilitation Assistance. The RIP consists of a process to inspect flood control works; a status determination, i.e., an inspection-based determination of qualification for future potential Rehabilitation Assistance; and the provision of Rehabilitation Assistance to those projects with Active status that are damaged in a flood or coastal storm event. Subpart D addresses Rehabilitation Assistance and the RIP.
(d) Emergency water supplies due to contaminated water source. The Corps may provide emergency supplies of clean water to any locality confronted with a source of contaminated water causing, or likely to cause, a substantial threat to the public health and welfare of the inhabitants of the locality. Subpart E addresses emergency water supply assistance.
(e) Drought assistance. Corps assistance may be provided to drought-distressed areas (as declared by the Secretary of the Army or his delegated nominee) to construct wells and to transport water for human consumption. Subpart E addresses drought assistance.
(f) Advance Measures. Advance Measures assistance may be provided to protect against imminent threats of predicted, but unusual, floods. Advance Measures projects must be justified from an engineering and economic standpoint, and must be capable of completion in a timely manner. Advance Measures assistance may be provided only to protect against loss of life and/or significant damages to improved property due to flooding. Subpart F of this part addresses Advance Measures assistance.
§ 203.14 Responsibilities of non-Federal interests.
Non-Federal interests, which include State, county and local governments; federally recognized Indian Tribes; and Alaska Native Corporations, are required to make full use of their own resources before Federal assistance can be furnished. The National Guard, as part of the State's resources when it is under State control, must be fully utilized as part of the non-Federal response. Non-Federal responsibilities include the following:
(a) Disaster preparedness. Disaster preparedness is a basic tenet of State and local responsibility. Disaster preparedness responsibilities of non-Federal interests include:
(1) Operation and maintenance of flood control works;
(2) Procurement and stockpiling of sandbags, pumps, and/or other materials or equipment that might be needed during flood situations;
(3) Training personnel to operate, maintain, and patrol projects during crisis situations, and preparation of plans to address emergency situations;
(4) Taking those actions necessary for flood control works to gain and maintain an Active status in the Corps Rehabilitation and Inspection Program (RIP), as detailed in subpart D of this part; and,
(5) Responsible regulation, management, and use of floodplain areas.
(b) Emergency operations. During emergency operations, non-Federal interests must commit available resources, to include work force, supplies, equipment, and funds. Requests for Corps emergency operations assistance will be in writing from the appropriate State, tribal, or local official. For flood fight direct assistance and Post Flood Response assistance, non-Federal interests must furnish formal written assurances of local cooperation by entering into Cooperation Agreements (CA's), as detailed in subpart G of this regulation. (For Corps work authorized under Public Law 84-99, the term “Cooperation Agreement” is used to differentiate this agreement from a Project Cooperation Agreement (PCA) that addresses the original construction of a project.) Following Flood Response or Post Flood Response assistance, it is a non-Federal responsibility to remove expedient flood control structures and similar works installed by the Corps under Public Law 84-99.
(c) Rehabilitation of non-Federal flood control projects. Prior to Corps rehabilitation of non-Federal flood control projects, non-Federal interests must furnish formal written assurances of local cooperation by entering into a CA, as detailed in subpart G of this part. Requirements of local participation include such items as provision of lands, easements, rights-of-way, relocations, and suitable borrow and dredged or excavated material disposal areas (LERRD's), applicable cost-sharing, and costs attributable to deficient and/or deferred maintenance.
(d) Rehabilitation of Federal flood control projects. Sponsors of Federal flood control projects are usually not required to furnish written assurances of local cooperation, if the PCA for the original construction of the project is sufficient. (Note: The PCA may also be referred to as a local cooperation agreement (LCA), cooperation and participation agreement (C&P), or similar terms.) In lieu of a new PCA, the Corps will notify the sponsor of the sponsor's standing requirements, including such items as LERRD's, costs attributable to deficient or deferred maintenance, removal of temporary works, relocations, and any cost-sharing requirements contained in subpart G of § 203.82. Modifications to the existing Operation and Maintenance Manual may be required based on the Rehabilitation Assistance required.
(e) Emergency water supplies due to contaminated water source. Except for federally recognized Indian Tribes or Alaska Native Corporations, Non-Federal interests must first seek emergency water assistance through the Governor of the affected State. If the State is unable to provide the needed assistance, then the Governor or his or her authorized representative must request Corps assistance in writing. Similarly, requests for Corps assistance for Indian Tribes or Alaska Native Corporations must be submitted in writing. A CA (see subpart G of this part) is required prior to assistance being rendered. Requests for assistance must include information concerning the criteria prescribed by subpart E of this part.
(f) Drought assistance. Except for federally recognized Indian Tribes or Alaska Native Corporations, non-Federal interests must first seek emergency drinking water assistance through the Governor of the affected State. Requests for Corps assistance will be in writing from the Governor or his or her authorized representative. Similarly, requests for Corps assistance for Indian Tribes or Alaska Native Corporations must be submitted in writing. A CA (see subpart G of this part) is required prior to assistance being rendered. Assistance can be provided to those drought-distressed areas (as declared by the Secretary of the Army) to construct wells and to transport water for human consumption. Requests for assistance must include information concerning the criteria prescribed by subpart E of this part.
(g) Advance Measures. Advance Measures assistance should complement the maximum non-Federal capability. Requests for assistance must be made by the Governor of the affected State, except requests for assistance on tribal lands held in trust by the United States, or on lands of the Alaska Natives, may be submitted directly by the affected Federally recognized Indian Tribe or Alaska Native Corporation, or through the regional representative of the Bureau of Indian Affairs, or through the Governor of the State in which the lands are located. A CA (see subpart G of this part) is required prior to assistance being rendered. Non-Federal participation may include either financial contribution or commitment of non-Federal physical resources, or both.
§ 203.15 Definitions.
The following definitions are applicable throughout this part:
Federal project. A project constructed by the Corps, and subsequently turned over to a local sponsor for operations and maintenance responsibility. This definition also includes any project specifically designated as a Federal project by an Act of Congress.
Flood control project: A project designed and constructed to have appreciable and dependable effects in preventing damage from irregular and unusual rises in water level. For a multipurpose project, only those components that are necessary for the flood control function are considered eligible for Rehabilitation Assistance.
Governor. All references in part 203 to the Governor of a State also refer to: the Governors of United States commonwealths, territories, and possessions; and the Mayor of Washington, D.C.
Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed to have appreciable and predictable effects in preventing damage to developed areas from the impacts of hurricanes, tsunamis, and coastal storms. These effects are primarily to protect against wave action, storm surge, wind, and the complicating factors of extraordinary high tides. HSPP's include projects known as shore protection projects, shore protection structures, periodic nourishment projects, shore enhancement projects, and similar terms. Components of an HSPP may include both hard (permanent construction) and soft (sacrificial, i.e., sand) features.
Non-Federal project. A project constructed with non-Federal funds, or a project constructed by tribal, State, local, or private interests, or a component of such a project. A project constructed under Federal emergency disaster authorities, such as Public Law 84-99 or the Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended (42 U.S.C. 5121, et seq.) (hereinafter referred to as the Stafford Act), is a non-Federal project unless it repairs or replaces an existing Federal project. Works Progress Administration (WPA) projects, and projects funded completely or partially by other (non-Corps) Federal agencies, are considered non-Federal projects for the application of Public Law 84-99 authority.
Non-Federal sponsor. A non-Federal sponsor is a public entity that is a legally constituted public body with full authority and capability to perform the terms of its agreement as the non-Federal partner of the Corps for a project, and able to pay damages, if necessary, in the event of its failure to perform. A non-Federal sponsor may be a State, County, City, Town, Federally recognized Indian Tribe or tribal organization, Alaska Native Corporation, or any political subpart of a State or group of states that has the legal and financial authority and capability to provide the necessary cash contributions and LERRD's necessary for the project.
Repair and rehabilitation. The term “repair and rehabilitation” means the repair or rebuilding of a flood control structure, after the structure has been damaged by a flood, hurricane, or coastal storm, to the level of protection provided by the structure prior to the flood, hurricane, or coastal storm. “Repair and rehabilitation” does not include improvements (betterments) to the structure, nor does “repair and rehabilitation” include any repair or rebuilding of a flood control structure that, in the normal course of usage, has become structurally unsound and is no longer fit to provide the level of protection for which it was designed.
§ 203.16 Federally recognized Indian Tribes and the Alaska Native Corporations.
Requests for Public Law 84-99 assistance on tribal lands held in trust by the United States, or on lands of the Alaska Natives, may be submitted to the Corps directly by the affected federally recognized Indian Tribe or Alaska Native Corporation, or through the appropriate regional representative of the Bureau of Indian Affairs, or through the Governor of the State.
Subpart B Disaster Preparedness
§ 203.21 Disaster preparedness responsibilities of non-Federal interests.
Disaster preparedness is a basic tenet of State and local responsibility. Assistance provided under authority of Public Law 84-99 is intended to be supplemental to the maximum efforts of State and local interests. Assistance under Public Law 84-99 will not be provided when non-Federal interests have made insufficient efforts to address the situation for which assistance is requested. Assistance under Public Law 84-99 will not be provided when a request for such assistance is based entirely on a lack of fiscal resources with which to address the situation. Non-Federal interests' responsibilities are addressed in detail as follows:
(a) Operation and maintenance of flood control works. Flood control works must be operated and maintained by non-Federal interests. Maintenance includes both short-term activities (normally done on an annual cycle, or more frequently) such as vegetation control and control of burrowing animals, and longer term activities such as repair or replacement of structural components (e.g., culverts) of the project.
(b) Procurement/stockpiling. Procurement and stockpiling of sandbags, pumps, and/or other materials or equipment that might be needed during flood situations is a non-Federal responsibility. The Corps is normally a last resort option for obtaining such materials. Local interests should request such materials from State assets prior to seeking Corps assistance. Local interests are responsible for reimbursing (either in kind or in cash) the Corps for expendable flood fight supplies and materials, and returning items such as pumps. When a flood is of sufficient magnitude to receive a Stafford Act emergency or disaster declaration, then the District Engineer may waive reimbursement of expendable supplies.
(c) Training and plans. Training personnel to operate, maintain, and patrol flood control projects during crisis situations is a non-Federal responsibility. Specific plans should be developed and in place to address known problem areas. For instance, the non-Federal sponsor of a levee reach prone to boils should have personnel specifically trained in flood fighting boils. In addition, contingency plans must be made when needed to address short term situations. For instance, if a culvert through a levee is being replaced, then the contingency plan should address all actions needed should a flood event occur during the construction period when levee integrity is lacking.
(d) Corps Rehabilitation and Inspection Program for Flood Control Works. To be eligible for Rehabilitation Assistance under Public Law 84-99, it is a non-Federal responsibility to take those actions necessary for flood control works to gain and maintain an Active status in the Corps Rehabilitation and Inspection Program (RIP), as detailed in subpart D of this part.
Subpart C Emergency Operations
§ 203.31 Authority.
Emergency operations under Public Law 84-99 apply to Flood Response and Post Flood Response activities. Flood Response activities include flood fighting, rescue operations, and protection of Corps-constructed hurricane/shore protection projects. Post Flood Response activities include certain limited activities intended to prevent imminent loss of life or significant public property, or to protect against significant threats to public health and welfare, and are intended to bridge the time frame between the occurrence of a disaster and the provision of disaster relief efforts under authority of The Stafford Act.
(a) Flood Response. Flood Response measures are applicable to any flood control work where assistance is supplemental to tribal, State, and local efforts, except that Corps assistance is not appropriate to protect flood control works constructed, previously repaired, and/or maintained by other Federal agencies, where such agencies have emergency flood fighting authority. Further, Flood Response measures (except technical assistance) are not appropriate for flood control works protecting strictly agricultural lands. Corps assistance in support of other Federal agencies, or State and local interests, may include the following: technical advice and assistance; lending of flood fight supplies, e.g., sandbags, lumber, polyethylene sheeting, or stone; lending of Corps-owned equipment; hiring of equipment and operators for flood operations; emergency contracting; and similar measures.
(b) Post Flood Response. The Corps may furnish Post Flood Response assistance for a period not to exceed 10 days (the statutory limitation) from the date of the Governor's request to the Federal Emergency Management Agency for an emergency or disaster declaration under authority of the Stafford Act. Requests for Post Flood Response assistance must be made by the Governor of the affected State, except that requests for assistance on lands held in trust by the United States, or on lands of the Alaska Natives, may be submitted directly by the affected federally recognized Indian Tribe or Alaska Native Corporation, or through the appropriate regional representative of the Bureau of Indian Affairs, or through the Governor of the State in which the lands are located. Assistance from the Corps may include the following: provision of technical advice and assistance; cleaning of drainage channels, bridge openings, or structures blocked by debris deposited during a flood event, where the immediate threat of flooding of or damage to public facilities has not abated; removal of debris blockages of critical water supply intakes, sewer outfalls, etc.; clearance of the minimum amounts of debris necessary to reopen critical transportation routes or public services/facilities; other assistance required to prevent imminent loss of life or significant damage to public property, or to protect against significant threats to public health and welfare. Post Flood Response assistance is supplemental to the maximum efforts of non-Federal interests.
§ 203.32 Policy.
Prior to, during, or immediately following flood or coastal storm activity, emergency operations may be undertaken to supplement State and local activities. Corps assistance is limited to the preservation of life and property, i.e., residential/commercial/industrial developments, and public facilities/services. Direct assistance to individual homeowners, individual property owners, or businesses is not permitted. Assistance will be temporary to meet the immediate threat, and is not intended to provide permanent solutions. All Corps activities will be coordinated with the State Emergency Management Agency or equivalent. Reimbursement of State or local emergency costs is not authorized. The local assurances required for the provision of Corps assistance apply only to the work performed under Public Law 84-99, and will not prevent State or local governments from receiving other Federal assistance for which they are eligible.
(a) Flood Response. Requests for Corps assistance will be in writing from the appropriate requesting official, or his or her authorized representative. When time does not permit a written request, a verbal request from a responsible tribal, State, or local official will be accepted, followed by a written confirmation.
(1) Corps assistance may include operational control of flood response activities, if requested by the responsible tribal, State, or local official. However, legal responsibility always remains with the tribal, State, and local officials.
(2) Corps assistance will be terminated when the flood waters recede below bankfull, absent a short term threat (e.g., a significant storm front expected to arrive within a day or two) likely to cause additional flooding.
(3) Removal of ice jams is a local responsibility. Corps technical advice and assistance, as well as assistance with flood fight operations, can be provided to supplement State and local efforts. The Corps will not perform ice jam blasting operations for local interests.
(b) Post Flood Response. A written request from the Governor is required to receive Corps assistance. Corps assistance will be limited to major floods or coastal storm disasters resulting in life threatening situations. The Governor's request will include verification that the Federal Emergency Management Agency (FEMA) has been requested to make an emergency or disaster declaration; a statement that the assistance required is beyond the State's capability; specific damage locations; and the extent of Corps assistance required to supplement State and local efforts. Corps assistance is limited to 10 days following receipt of the Governor's written request, or on assumption of activities by State and local interests, whichever is earlier. After a Governor's request has triggered the 10-day period, subsequent request(s) for additional assistance resulting from the same flood or coastal storm event will not extend the 10-day period, or trigger a new 10-day period. The Corps will deny any Governor's request for Post Flood Response if it is received subsequent to a Stafford Act Presidential disaster declaration, or denial of such a declaration. Shoreline or beach erosion damage reduction/prevention actions under Post Flood Response will normally not be undertaken unless there is an immediate threat to life or critical public facilities.
(c) Loan or issue of supplies and equipment. (1) Issuance of Government-owned equipment or materials to non-Federal interests is authorized only after local resources have been fully committed.
(2) Equipment that is lent will be returned to the Corps immediately after the flood operation ceases, in a fully maintained condition, or with funds to pay for such maintenance. The Corps may waive the non-Federal interest's responsibility to pay for or perform maintenance if a Stafford Act Presidential emergency or disaster declaration has already been made for the affected locality, and the waiver is considered feasible and reasonable.
(3) Expendable supplies that are lent, such as sandbags, will be replaced in kind, or paid for by local interests. The Corps may waive the local interest's replacement/payment if a Stafford Act Presidential disaster declaration has been made for the affected locality, and the waiver is considered feasible and reasonable. All unused expendable supplies will be returned to the Corps when the operation is terminated.
Subpart D Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program
§ 203.41 General.
(a) Authority. Public Law 84-99 authorizes repair and restoration of the following types of projects to ensure their continued function:
(1) Flood control projects.
(2) Federally authorized and constructed hurricane/shore protection projects.
(b) Implementation of authority. The Rehabilitation and Inspection Program (RIP) implements Public Law 84-99 authority to repair and rehabilitate flood control projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control work; a status determination, i.e., an inspection-based determination of qualification for future Rehabilitation Assistance; and the provision of Rehabilitation Assistance to those projects with Active status that are damaged in a flood or coastal storm event.
(c) Active status. In order for a flood control work to be eligible for Rehabilitation Assistance, it must be in an Active status at the time of damage from a flood or coastal storm event. To gain an Active status, a non-Federal flood control work must meet certain engineering, maintenance, and qualification criteria, as determined by the Corps during an Initial Eligibility Inspection (IEI). To retain an Active status, Federal and non-Federal flood control works must continue to meet inspection criteria set by the Corps, as determined by the Corps during a Continuing Eligibility Inspection (CEI). All flood control works not in an Active status are considered to be Inactive, regardless of whether or not they have previously received a Corps inspection, or Corps assistance.
(d) Modification of flood control projects. Modification of a flood control project to increase the level of protection, or to provide protection to a larger area, is beyond the scope of Public Law 84-99 assistance. Such modifications to Federal projects are normally accomplished under congressional authorization and appropriation, or under Continuing Authorities Programs of the Corps. Such modifications to non-Federal projects are normally accomplished by the non-Federal sponsor and local interests. Modifications necessary to preserve the structural integrity of an existing non-Federal flood control project may be funded by the RIP, but such work must meet the criteria established in § 203.47 to be eligible for funding under Public Law 84-99.
§ 203.42 Inspection of non-Federal flood control works.
(a) Required inspections. The Corps will conduct inspections of non-Federal flood control works. These inspections are IEI's and CEI's. Conduct of IEI's and CEI's will be as provided for in § 203.48.
(1) Corps involvement with any non-Federal flood control work normally begins when the sponsor requests an IEI. The Corps will conduct an IEI to determine if the flood control work meets minimum engineering and maintenance standards and is capable of providing the intended degree of flood protection. An Acceptable or Minimally Acceptable rating (see § 203.48) on the IEI is required to allow the project to gain an Active status in the RIP.
(2) CEI's are conducted periodically to ensure that projects Active in the RIP continue to meet Corps standards, and to determine if the sponsor's maintenance program is adequate. A rating of Acceptable or Minimally Acceptable (see § 203.48) on a CEI is required in order to retain an Active status in the RIP.
(b) Advice and reporting. Information on the results of IEI and CEI inspections will be furnished in writing to non-Federal sponsors, and will be maintained in Corps district offices.
(1) Non-Federal sponsors will be informed that an IEI rating of Unacceptable will cause the flood control work to remain in an Inactive status, and ineligible for Rehabilitation Assistance.
(2) Non-Federal sponsors will be informed that a CEI rating of Unacceptable will cause the flood control work to be placed in an Inactive status, and ineligible for Rehabilitation Assistance.
(3) Non-Federal sponsors will be informed that maintenance deficiencies found during CEI's may negatively impact on eligibility of future Rehabilitation Assistance, and the degree of local cost-sharing participation in any proposed work. Follow-up inspections can be made by the Corps to monitor progress in correcting deficiencies when warranted.
§ 203.43 Inspection of Federal flood control works.
(a) Required inspections. A completed Federal flood control project, or completed functional portions thereof, is granted Active status in the RIP upon transfer of the operation and maintenance of the project (or functional portion thereof) to the non-Federal sponsor. Federal flood control works will be periodically inspected in accordance with 33 CFR 208.10 and Engineer Regulation (ER) 1130-2-530, Flood Control Operations and Maintenance Policies. These periodic inspections of Federal flood control works are also, for simplicity, known as CEI's. If a Federal project is found to be inadequately maintained on a CEI, then it will be placed in an Inactive status in the RIP. [Note: This is a separate and distinct action from project deauthorization, which is not within the scope of PL 84-99 activities.] A Federal project will remain in an Inactive status until such time as an adequate maintenance program is restored, and the project is determined by the Corps to be adequately maintained.
(b) Advice and reporting. Information on the results of CEI inspections will be furnished in writing to non-Federal sponsors, and will be maintained in Corps district offices. Non-Federal sponsors will be informed that a CEI rating of Unacceptable will cause the flood control work to be placed in an Inactive status, and not eligible for Rehabilitation Assistance. Non-Federal sponsors will be informed that maintenance deficiencies found during CEI's may negatively impact on eligibility of future Rehabilitation Assistance, and the degree of local cost-sharing participation in any proposed work. Follow-up inspections can be made by the Corps to monitor progress in correcting deficiencies when warranted.
§ 203.44 Rehabilitation of non-Federal flood control works.
(a) Scope of work. The Corps will provide assistance in the rehabilitation of non-Federal projects only when repairs are clearly beyond the normal physical and financial capabilities of the project sponsor. The urgency of the work required will be considered in determining the sponsor's capability.
(b) Eligibility for Rehabilitation Assistance. A flood control project is eligible for Rehabilitation Assistance provided that the project is in an Active status at the time of the flood event, the damage was caused by the flood event, the work can be economically justified, and the work is not otherwise prohibited by this subpart D.
(c) Work at non-Federal expense. At the earliest opportunity prior to commencement of or during authorized rehabilitation work, the Corps will inform the project sponsor of any work that must be accomplished at non-Federal cost. This includes costs to correct maintenance deficiencies, and any modifications that are necessary to preserve the integrity of the project.
(d) Nonconforming works. Any non-Federal project constructed or modified without the appropriate local, State, tribal, and/or Federal permits, or waivers thereof, will not be rehabilitated under Public Law 84-99.
(e) Cooperation Agreements. A Cooperation Agreement is required in accordance with subpart G of this part.
§ 203.45 Rehabilitation of Federal flood control works.
Rehabilitation of Federal flood control projects will be identical to rehabilitation of non-Federal projects (§ 203.44), except for those conditions contained in subpart G of this part concerning cooperation agreements, when the original PCA for the Federal project is sufficient. Additional requirements for Hurricane/Shore Protection Projects are covered in § 203.49.
§ 203.46 Restrictions.
(a) Restrictions to flood control works. Flood control works are designed and constructed to have appreciable and dependable protection in preventing damage from irregular and unusual rises in water levels. Structures built primarily for the purposes of channel alignment, navigation, recreation, fish and wildlife enhancement, land reclamation, habitat restoration, drainage, bank protection, or erosion protection are generally ineligible for Public Law 84-99 Rehabilitation Assistance.
(b) Non-flood related rehabilitation. Rehabilitation of flood control structures damaged by occurrences other than floods, hurricanes, or coastal storms will generally not be provided under Public Law 84-99.
(c) Maintenance and deterioration deficiencies. Rehabilitation under Public Law 84-99 will not be provided for either Federal or non-Federal flood control projects that, as a result of poor maintenance or deterioration, require substantial reconstruction. All deficient or deferred maintenance existing when flood damage occurs will be accomplished by, or at the expense of, the non-Federal sponsor, either prior to or concurrently with authorized rehabilitation work. When work accomplished by the Corps corrects deferred or deficient maintenance, the estimated deferred or deficient maintenance cost will not be included as contributed non-Federal funds, and will be in addition to cost-sharing requirements addressed in § 203.82. Failure of project sponsors to correct deficiencies noted during Continuing Eligibility Inspections may result in ineligibility to receive Rehabilitation Assistance under Public Law 84-99.
(d) Economic justification. No flood control work will be rehabilitated unless the work required satisfies Corps criteria for a favorable benefit-to-cost ratio, and the construction cost of the work required exceeds $15,000. Construction costs greater than $15,000 do not preclude the Corps from making a determination that the required work is a maintenance responsibility of the non-Federal sponsor, and not eligible for Corps Rehabilitation Assistance.
§ 203.47 Modifications to non-Federal flood control works.
Modifications necessary to preserve the structural integrity of existing non-Federal projects may be constructed at additional Federal and non-Federal expense in conjunction with approved rehabilitation work. The additional Federal cost will be limited to not more than one-third of the estimated Federal construction cost of rehabilitation to preflood level of protection, or $100,000, whichever is less. The modification work must be economically justified. Non-Federal interests are required to contribute a minimum of 25% of the total construction costs of the modification, LERRD's, and any additional funds necessary to support the remaining cost of the modification beyond what the Corps can provide. Engineering and design costs will be at Corps cost.
(a) Cash contributions. Non-Federal contributions will be only in cash. In-kind services are not permitted for modification work.
(b) Protection of additional areas. Modifications designed to provide protection to additional area are not authorized.
§ 203.48 Inspection guidelines for non-Federal flood control works.
(a) Intent. The intent of these guidelines is to facilitate inspections of the design, construction, and maintenance of non-Federal flood control works. The guidelines are not intended to establish design standards for non-Federal flood control works, but to provide uniform procedures within the Corps for conducting required inspections. The results of these inspections determine Active status in the RIP, and thus determine eligibility for Rehabilitation Assistance. The contents of this section are applicable to both IEI's and CEI's.
(b) Level of detail. Evaluations of non-Federal flood control works will be made through on site inspections and technical analyses by Corps technical personnel. The level of detail required in an inspection will be commensurate with the complexity of the inspected project, the potential for catastrophic failure to cause significant loss of life, the economic benefits of the area protected, and other special circumstances that may occur. Technical evaluation procedures are intended to establish the general capability of a non-Federal flood control work to provide reliable flood protection.
(c) Purposes. The IEI assesses the integrity and reliability of the flood control work. In addition, other essential information required to help determine the Federal interest in future repairs/rehabilitation to the flood control work will be obtained. The IEI will establish the estimated level of protection and structural reliability of the existing flood control work. Subsequent CEI's will seek to detect changed project conditions that may have an impact on the reliability of the flood protection provided by the flood control work, to include the level of maintenance being performed on the flood control work.
(d) Inspection components—(1) Hydrologic/hydraulic analyses. The level of protection provided by a non-Federal flood control work will be evaluated and expressed in terms of exceedence frequency (e.g., a 20% chance of a levee being overtopped in any given year). These analyses also include an evaluation of existing or needed erosion control features for portions of a project that may be threatened by stream flows, overland flows, or wind generated waves.
(2) Geotechnical analyses. The Geotechnical evaluation will be based primarily on a detailed visual inspection. As a minimum, for levees, the IEI will identify critical sections where levee stability appears weakest and will document the location, reach, and cross-section at these points.
(3) Maintenance. Project maintenance analysis will evaluate the maintenance performance of the non-Federal sponsor, and deficiencies of the project. This evaluation should reflect the level of maintenance needed to assure the intended degree of flood protection, and assess the performance of recent maintenance on the project. The effects of structures on, over, or under the flood control work, such as buried fiber optic cables, gas pipelines, etc., will be evaluated for impact on the stability of the structure.
(4) Other structural features. Other features that may be present, such as pump stations, culverts, closure structures, etc., will be evaluated.
(e) Ratings. Inspected flood control works will receive a rating in accordance with the table below. The table below provides the general assessment parameters used in assigning a rating to the inspected flood control work.
Rating | Assessment
A—Acceptable | No immediate work required, other than routine maintenance. The flood control project will function as designed and intended, and necessary cyclic maintenance is being adequately performed.
M—Minimally Acceptable | One or more deficient conditions exist in the flood control project that need to be improved/corrected. However, the project will essentially function as designed and intended.
U—Unacceptable | One or more deficient conditions exist which can reasonably be foreseen to prevent the project from functioning as designed, intended, or required.
(f) Sponsor reclama. If the results of a Corps evaluation are not acceptable to the project sponsor, the sponsor may choose, at its own expense, to provide a detailed engineering study, preferably certified by a qualified Professional Engineer, as a reclama to attempt to change the Corps evaluation.
§ 203.49 Rehabilitation of Hurricane and Shore Protection Projects.
(a) Authority. The Chief of Engineers is authorized to rehabilitate any Federally authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of an other than ordinary nature when, in the discretion of the Chief of Engineers, such rehabilitation is warranted for the adequate functioning of the project.
(b) Policies. (1) Rehabilitation of HSPP's is limited to the repair/restoration of the HSPP to a pre-storm condition that allows for the adequate functioning of the project, provided that the damage was caused by an extraordinary storm.
(2) To be eligible for Rehabilitation Assistance, HSPP's must be:
(i) A completed element of a Federally authorized project; or,
(ii) A portion of a Federally authorized project constructed by non-Federal interests when approval of such construction was obtained from the Commander, Headquarters, U.S. Army Corps of Engineers (HQUSACE), or his designated representative; or,
(iii) A portion of a Federally authorized project constructed by non-Federal interests and designated by an Act of Congress as a Federal project; and
(3) Rehabilitation Assistance for sacrificial features will be limited to that necessary to reduce the immediate threat to life and property, or restoration to pre-storm conditions, whichever is less.
(4) To be eligible for rehabilitation, the sacrificial features of an HSPP must be substantially eroded by wind, wave, or water action of an other than ordinary nature. The determination of whether a storm qualifies as extraordinary will be made by the Director of Civil Works, and may be delegated to the Chief, Operations Division, Directorate of Civil Works.
(5) Rehabilitation will not be provided for uncompleted HSPP's. An HSPP (or separable portion thereof) is considered completed when transferred to the non-Federal sponsor for operation and maintenance.
(6) Definition of extraordinary storm. An extraordinary storm is a storm that, due to prolongation or severity, creates weather conditions that cause significant amounts of damage to a Hurricane/Shore Protection Project. “Prolongation or severity” means a Category 3 or higher hurricane as measured on the Saffir-Simpson scale, or a storm that has an exceedance frequency equal to or greater than the design storm of the project. “Significant amounts of damage” have occurred when:
(i) The cost of the construction effort to effect repair of the HSPP or separable element thereof (exclusive of dredge mobilization and demobilization costs) exceeds $1 million and is greater than two percent of the original construction cost (expressed in current day dollars) of the HSPP or separable element thereof; or,
(ii) The cost of the construction effort to effect repair of the HSPP or separable element thereof (exclusive of dredge mobilization and demobilization costs) exceeds $6 million; or,
(iii) More than one-third of the planned or historically placed sand for renourishment efforts for the HSPP (or separable element thereof) is lost.
(c) Procedural requirements. Rehabilitation of HSPP'S will be done in accordance with § 203.45, except as modified by this section.
(d) Combined rehabilitation and periodic nourishment. In some cases, the non-Federal sponsor may wish to fully restore the sacrificial features of a project where only a partial restoration is justifiable as Rehabilitation Assistance. In these cases, a cost allocation between Rehabilitation Assistance and periodic nourishment under the terms of the project PCA will be determined by the Director of Civil Works.
§ 203.50 Nonstructural alternatives to rehabilitation of flood control works.
(a) Authority. Under Public Law 84-99, the Chief of Engineers is authorized, when requested by the non-Federal sponsor, to implement nonstructural alternatives (NSA's) to the rehabilitation, repair, or restoration of flood control works damaged by floods or coastal storms.
(b) Policy. (1) The option of implementing an NSA project (NSAP) in lieu of a structural repair or restoration is available only to non-Federal sponsors of flood control works eligible for Rehabilitation Assistance in accordance with this regulation, and only upon the request of such non-Federal sponsors.
(2) A sponsor is required for implementation of an NSAP. The NSAP sponsor must be either a non-Federal sponsor as defined in § 203.15, or another Federal agency. The NSAP sponsor must demonstrate that it has the legal authority and financial capability to provide for the required items of local cooperation.
(3) The Corps shall not be responsible for the operation, maintenance, or management of any NSAP implemented in accordance with this section.
(4) The Corps may, in its sole discretion, reject any request for an NSA that would:
(i) Lead to significantly increased flood protection expenses or flood fighting expenses for public agencies, flood control works sponsors, public utilities, or the Federal Government; or,
(ii) Threaten or have a significant adverse impact on the integrity, stability, or level of protection of adjacent or nearby flood control works; or,
(iii) Lead to increased risk of loss of life or property during flood events.
(5) The principal purposes of an NSAP are for:
(i) Floodplain restoration;
(ii) Provision or restoration of floodways; and,
Note to paragraphs (b)(5)(i) and (ii):
Habitat restoration is recognized as being a significant benefit that can be achieved with an NSAP, and may be a significant component of an NSAP, but is not considered to be a principal purpose under PL 84-99 authority.
(iii) Reduction of future flood damages and associated flood control works repair costs.
(c) Limitation on Corps expenditures. Exclusive of the costs of investigation, report preparation, engineering and design work, and related costs, Corps expenditures for implementation of an NSAP are limited to the lesser of the Federal share of rehabilitation construction costs of the project were the flood control work to be structurally rehabilitated in accordance with subpart D of this part, or the Federal share of computed benefits which would be derived from such structural rehabilitation. This limitation on Corps expenditures may be waived by the Director of Civil Works or the Chief, Operations Division, Directorate of Civil Works when compelling reasons exist.
(d) Responsibilities of the NSAP non-Federal sponsor. (1) Operate and maintain the NSAP;
(2) Provide, or arrange for and obtain, all funding required to implement the NSAP in excess of the limitation established in paragraph (c) of this section.
(3) Accept the transfer of ownership of any lands or interests in lands acquired by the Corps and determined by the Corps to be necessary to implement the NSAP.
(e) Responsibilities of other Federal agencies acting as NSAP sponsor. The Corps may participate with one or more Federal agencies in NSAP's. If the Corps is the lead Federal agency, based on mutual agreement of the Federal agencies, then a non-Federal NSAP sponsor is required. (See paragraph (d) of this section.) If another Federal agency is the lead Federal agency, then Corps participation in the NSAP will be based on the content of this section, with appropriate allowances for effecting an NSAP in accordance with the authority and ultimate goal of the lead Federal agency. In such cases, a Memorandum of Agreement between the Corps and the lead Federal agency is required, in accordance with paragraph (1) of this section.
(f) Responsibilities of the requesting flood control work project sponsor. (1) The flood control work project sponsor must request the Corps undertake an NSA project in lieu of rehabilitation of the flood control work, in accordance with the sponsor's applicable laws, ordinances, rules, and regulations.
(2) If not also the NSAP sponsor, the flood control work project sponsor must:
(i) Divest itself of responsibility to operate and maintain the flood control work involved in the NSAP; and
(ii) Provide to the NSAP sponsor such lands or interests in lands as it may have which the Corps determines are necessary to implement the NSAP.
(g) Allowable Public Law 84-99 expenses for NSAP's. (1) Acquisition of land or interests in land.
(2) Removal of structures, including manufactured homes, for salvage and/or reuse purposes.
(3) Demolition and removal of structures, including utility connections and related items.
(4) Debris removal and debris reduction.
(5) Removal, protection, and/or relocation of highways, roads, utilities, cemeteries, and railroads.
(6) Construction to promote, enhance, control, or modify water flows into, out of, through, or around the nonstructural project area.
(7) Nonstructural habitat restoration, to include select planting of native and desirable plant species, native species nesting site enhancements, etc.
(8) Total or partial removal or razing of existing reaches of levee, to include removal of bank protection features and/or riprap.
(9) Protection/floodproofing of essential structures and facilities.
(10) Supervision, administrative, and contract administration costs of other expenses allowed in this subparagraph.
(h) Time limitation. Corps participation in development and implementation of an NSAP may cease, at the sole discretion of the Corps, one year after the date of approval of rehabilitation of the damaged flood control work or the date of receipt of the flood control work public sponsor's request for an NSAP, whichever is earlier, if insufficient progress is being made to develop and implement the NSAP for reasons beyond the control of the Corps. In such circumstances, the Corps may, at its sole discretion, determine that Rehabilitation Assistance for the damaged flood control project may also be denied.
(i) Participation and involvement of other Federal, State, tribal, local, and private agencies. Nothing in this section shall be construed to limit the participation of other Federal, State, tribal, local, and private agencies in the development, implementation, or future operations and maintenance of an NSAP under this section, subject to the limitations of such participating agency's authorities and regulations.
(j) Future assistance. After transfer of NSAP operation and maintenance responsibility to the NSAP sponsor or the lead Federal agency, flood-related assistance pursuant to Public Law 84-99 will not be provided anywhere within the formerly protected area of the flood control work, except for rescue operations provided in accordance with § 203.13(b). As an exception, on a case-by-case basis, certain structural flood control works (or elements thereof) repaired or set back as part of the implementation of an NSAP having a non-Federal sponsor may be considered for future flood-related assistance.
(k) Environmental considerations. NSAP's are subject to the same environmental requirements, restrictions, and limitations as are structural rehabilitation projects.
(l) Requirements for Cooperation Agreement (CA)/Items of Local Cooperation—(1) Requirement for Local Cooperation. In order to clearly define the obligations of the Corps and of non-Federal interests, a CA with the NSAP non-Federal sponsor is required. Requirements are addressed in paragraphs (l)(2) through (10) of this section. When another Federal agency is the lead Federal agency, a Memorandum of Agreement (MOA) between the Corps and that agency is required. Wording of MOA's will be similar to, and consistent with, requirements detailed in paragraphs (l)(2) through (10) of this section for CA's, with appropriate modifications based on the other Federal agencies' authorized expenditures and programs.
(2) The CA requirements of subpart G of this part are not applicable to NSAP's.
(3) Items of Local Cooperation. For NSAP's, non-Federal interests shall:
(i) Provide without cost to the United States all borrow sites and dredged or excavated material disposal areas necessary for the project;
(ii) Hold and save the United States free from damages due to the project, except for damages due to the fault or negligence of the United States or its contractor; and
(iii) Maintain and operate the project after completion in a manner satisfactory to the Chief of Engineers.
(4) Cost sharing. The Corps may assume up to 100 percent of the costs of implementing an NSAP, subject to the limitations set forth in paragraph (c) of this section.
(5) Eligibility under other Federal programs. NSAP CA's shall not prohibit non-Federal interests from accepting funding from other Federal agencies, so long as the provision of such other Federal agency funding is not prohibited by statute.
(6) Contributed funds. Contributed funds may be accepted without further approval by the Chief of Engineers upon execution of the CA by all parties. The required certificate of the district commander will cite 33 U.S.C. 701h as the pertinent authority.
(7) Obligation of contributed funds. In accordance with OMB Circular A-34, all contributed funds must be received in cash and deposited with the Treasury before any obligations can be made against such funds.
(8) Prohibition of future assistance. The prohibition of future assistance described in paragraph (j) of this section must be included in the NSAP CA.
(9) Assurance of compliance with Executive Order 11988. NSAP CA's shall include acknowledgment of, and a statement of planned adherence to, Executive Order 11988, Floodplain Management, 3 CFR 117 (1977 Compilation), or as it may be revised in the future, by the NSAP sponsor.
(10) The CA must include a statement of legal restrictions placed on formerly protected lands that would preclude future use and/or development of such lands in a fashion incompatible with the purposes of the NSAP.
(m) Acquisition of LERRD's. (1) For the acquisition of LERRD's, reimbursement may be made to the non-Federal sponsor of an NSAP. Such reimbursements are subject to the normal Corps land acquisition process, funding caps set forth in (c) of this section, and availability of appropriations.
(2) For the acquisition of LERRD's, Corps funding may be combined with the funding of other Federal agencies, absent specific statutory language or principle prohibiting such combinations, under the terms of the MOA with other Federal agencies.
§ 203.51 Levee owner's manual.
(a) Authority. In accordance with section 202(f) of Public Law 104-303, the Corps will provide a levee owner's manual to the non-Federal sponsor of all flood control works in an Active status in the RIP.
(b) Policies—(1) Active non-Federal projects. A levee owner's manual developed and distributed by the Corps will be provided to all sponsors of Active non-Federal projects. The levee owner's manual will include the standards that must be met to maintain an Active status in the Rehabilitation and Inspection Program. Levee owner's manuals will also be provided, upon request, to sponsors of Inactive non-Federal projects so that the sponsors may evaluate their projects and prepare for an IEI to gain an Active status in the RIP.
(2) Federal projects. The Operation and Maintenance Manual specified by 33 CFR 208.10(a)(10) will fulfill the requirement of providing a levee owner's manual if the Corps has not provided a separate levee owner's manual to the sponsor of a Federal project.
(c) Procedural requirements. Levee Owner's Manuals will be initially provided to non-Federal sponsors of Active flood control works during scheduled CEI's and IEI's. Sponsors of Inactive projects and private levee owners will be provided manuals upon written request to the responsible Corps district.
§ 203.52 [Reserved]
Subpart E Emergency Water Supplies: Contaminated Water Sources and Drought Assistance
§ 203.61 Emergency water supplies due to contaminated water source.
(a) Authority. The Chief of Engineers is authorized to provide emergency supplies of clean water to any locality confronted with a source of contaminated water causing, or likely to cause, a substantial threat to the public health and welfare of the inhabitants of the locality.
(b) Policies. (1) Any locality faced with a threat to public health and welfare from a contaminated source of drinking water is eligible for assistance.
(2) Eligibility for assistance will be based on one or more of the following factors:
(i) The maximum contaminant level or treatment technique for a contaminant, as established by the Environmental Protection Agency pursuant to the Safe Drinking Water Act (see 40 CFR 141), is exceeded.
(ii) The water supply has been identified as a source of illness by a tribal, State, or Federal public health official. The specific contaminant does not have to be identified.
(iii) An emergency (e.g., a flood or chemical spill) has occurred that has resulted in either: one or more contaminants entering the source on a sufficient scale to endanger health; or, the emergency has made inoperable the equipment necessary to remove known contaminants.
(iv) The presence of a contaminant is indicated on the basis of other information available.
(3) Corps assistance will be directed toward the provision of the minimum amount of water required to maintain the health and welfare requirements of the affected population. The quantity of water and the means of distribution will be at the discretion of the responsible Corps official, who will consider the needs of the individual situation, the needs of the affected community, and the cost effectiveness of providing water by various methods.
(4) If a locality has multiple sources of water, assistance will be furnished only to the extent that the remaining sources, with reasonable conservation measures, cannot provide adequate supplies of drinking water.
(5) Loss of water supply is not a basis for assistance under this authority.
(6) Water will not be furnished for commercial processes, except as incidental to the use of existing distribution systems. This does not prohibit the furnishing of water for drinking by employees and on-site customers. Water for preparing retail meals and similar personal needs may be provided to the extent it would be furnished to individuals.
(7) The permanent restoration of a safe supply of drinking water is the responsibility of local interests.
(8) Corps assistance is limited to 30 days, and requires the local interests to provide assurances of cooperation in a CA. (See subpart G of this part.) Extension of this 30-day period requires agreement (as an amendment to the previously signed CA) between the State and the Corps. This agreement must cover specified services and responsibilities of each party, and provision of a firm schedule for local interests to provide normal supplies of water.
(9) State, tribal, and local governments must make full use of their own resources, including National Guard capabilities.
(c) Governor's request. A letter signed by the Governor, or his or her authorized representative, requesting Corps assistance and addressing the State's commitments and capabilities in response to the emergency situation, is required. All requests should identify the following information:
(1) Describe the local and State efforts undertaken. Verify that all reasonably available resources have been committed.
(2) Identify the specific needs of the State, and the required Corps assistance.
(3) Identify additional commitments to be accomplished by the State.
(4) Identify the project sponsor(s).
(d) Non-Federal responsibilities. Non-Federal interests are responsible for restoration of the routine supply of clean drinking water, including correcting any situations that cause contamination. If assistance is furnished by the Corps, local interests must furnish the basic requirements of local cooperation as detailed in the Cooperation Agreement. In all cases, reasonable water conservation measures must be implemented. Local interests will be required to operate and maintain any loaned equipment, and to remove and return such equipment to Federal interests, in a fully maintained condition, after the situation is resolved.
§ 203.62 Drought assistance.
(a) Authority. The Chief of Engineers, acting for the Secretary of the Army, has the authority under certain statutory conditions to construct wells for farmers, ranchers, political subdivisions, and to transport water to political subdivisions, within areas determined to be drought-distressed.
(b) General policy. (1) It is a non-Federal responsibility for providing an adequate supply of water to local inhabitants. Corps assistance to provide emergency water supplies will only be considered when non-Federal interests have exhausted reasonable means for securing necessary water supplies, including assistance and support from other Federal agencies.
(2) Before Corps assistance is considered under this authority, the applicability of other Federal assistance authorities must be evaluated. If these programs cannot provide the needed assistance, then maximum coordination should be made with appropriate agencies in implementing Corps assistance.
(c) Governor's request. A letter signed by the Governor, requesting Corps assistance and addressing the State's commitments and capabilities with response to the emergency situation, is required. All requests should identify the following information:
(1) A description of local and State efforts undertaken. A verification that all available resources have been committed, to include National Guard assets.
(2) Identification of the specific needs of the State, and the required Corps assistance.
(3) Identification of the additional commitments to be accomplished by the State.
(4) Identification of the project sponsor(s).
(d) Definitions applicable to this section—(1) Construction. This term includes initial construction, reconstruction, or repair.
(2) Drought-distressed area. An area that the Secretary of the Army determines, due to drought conditions, has an inadequate water supply that is causing, or is likely to cause, a substantial threat to the health and welfare of the inhabitants of the impacted area, including the threat of damage or loss of property.
(3) Eligible applicant. Any rancher, farmer or political subdivision within a designated drought-distressed area that is experiencing an inadequate supply of water due to drought.
(4) Farmer or rancher. An individual who realizes at least one-third of his or her gross annual income from agricultural sources, and is recognized in the community as a farmer or rancher. A farming partnership, corporation, or similar entity engaged in farming or ranching, which receives its majority income from such activity, is also considered to be a farmer or rancher, and thus an eligible applicant.
(5) Political subdivision. A city, town, borough, county, parish, district, association, or other public body created by, or pursuant to, Federal or State law, having jurisdiction over the water supply of such public body.
(6) Reasonable cost. In connection with the Corps construction of a well, means the lesser of:
(i) The cost of the Chief of Engineers to construct a well in accordance with these regulations, exclusive of:
(A) The cost of transporting equipment used in the construction of wells, and
(B) The cost of investigation and report preparation to determine the suitability to construct a well, or,
(ii) The cost to a private business of constructing such a well.
(7) State. Any State, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, Northern Marianas Islands, American Samoa, and the Trust Territory of the Pacific Islands.
(e) Guidance—construction of wells. (1) Assistance to an eligible applicant for the construction of a well may be provided on a cost-reimbursable basis if:
(i) It is in response to a written request by a farmer, rancher, or political subdivision for construction of a well under Public Law 84-99.
(ii) The applicant is located within an area that the Secretary of the Army has determined to be drought-distressed.
(iii) The Secretary of the Army has made a determination that:
(A) The applicant, as a result of the drought, has an inadequate supply of water.
(B) An adequate supply of water can be made available to the applicant through the construction of a well.
(C) As a result of the drought, a private business could not construct the well within a reasonable time.
(iv) The applicant has secured the necessary funding for well construction from commercial or other sources, or has entered into a contract to pay to the United States the reasonable cost of such construction with interest over a period of years, not to exceed 30, as the Secretary of the Army deems appropriate.
(v) The applicant has obtained all necessary Federal, State and local permits.
(2) The financing of the cost of construction of a well by the Corps under this authority should be secured by the project applicant.
(3) The project applicant will provide the necessary assurances of local cooperation by signing a Cooperation Agreement (subpart G of this part) prior to the start of Corps work under this authority.
(4) Equipment owned by the United States will be utilized to the maximum extent possible in exercising the authority to drill wells, but can only be used when commercial firms cannot provide comparable service within the time needed to prevent the applicant from suffering significantly increased hardships from the effects of an inadequate water supply.
(f) Guidance—transport of water. (1) Assistance to an applicant in the transportation of water may be provided if:
(i) It is in response to a written request by a political subdivision for transportation of water.
(ii) The applicant is located within an area that the Secretary of the Army has determined to be drought-distressed.
(iii) The Secretary of the Army has made a determination that, as a result of the drought, the applicant has an inadequate supply of water for human consumption, and the applicant cannot obtain water.
(2) Transportation of water by vehicles, small diameter pipe line, or other means will be at 100 percent Federal cost.
(3) Corps assistance in the transportation of emergency water supplies will be provided only in connection with water needed for human consumption. Assistance will not be provided in connection with water needed for irrigation, recreation, or other non-life supporting purposes, or livestock consumption.
(4) Corps assistance will not include the purchase of water, nor the cost of loading or discharging the water into or from any Government conveyance, to include Government-leased conveyance.
(5) Equipment owned by the United States will be utilized to the maximum extent possible in exercising the authority to transport water, consistent with lowest total Federal cost.
(g) Request for assistance. A written request must be made to the district commander with Civil Works responsibility for the affected area. Upon receipt of a written request, the appropriate State and Federal agencies will be notified, and coordination will continue as appropriate throughout the assistance.
[68 FR 36468, June 18, 2003]
Subpart F Advance Measures
§ 203.71 Policy.
Advance Measures consists of those activities performed prior to a flood event, or potential flood event, to protect against loss of life and/or significant damages to improved property from flooding. Emergency work under this authority will be considered when requested by the Governor of a State confronted with an imminent threat of unusual flooding. Corps assistance will be to complement the maximum efforts of tribal, State, and local authorities. Projects will be designed for the specific threat, normally of expedient-type construction, and typically temporary in nature.
§ 203.72 Eligibility criteria and procedures.
(a) Threat of flooding. An imminent threat of unusual flooding must exist before Advance Measures projects can be approved. The threat may be established by National Weather Service predictions, or by Corps of Engineers determinations of unusual flooding from adverse or unusual conditions. The threat must be clearly defined to the extent that it is readily apparent that damages will be incurred if preventive action is not taken immediately.
(b) Governor's request. A letter signed by the Governor, requesting Corps assistance and addressing the State's commitments and capabilities with response to the emergency situation, is required. All requests should identify the following information:
(1) Describe the non-Federal efforts undertaken. Verify that all available resources have been committed.
(2) Identify the specific needs, and the required Corps assistance.
(3) Identify additional commitments to be accomplished by the non-Federal interests.
(4) Identify the non-Federal sponsor(s).
(c) Feasibility. The proposed work should be temporary in nature, technically feasible, designed to deal effectively and efficiently with the specific threat, and capable of construction in time to prevent anticipated damages.
(d) Economic justification. All work undertaken under this category must have a favorable benefit-to-cost ratio, under Corps of Engineers economic guidelines.
(e) Local cooperation/responsibilities. Subpart G of this part provides requirements for a Cooperation Agreement needed to provide local assurances. The project sponsor must remove temporary works constructed by the Corps when the operation is over, at no cost to the Corps.
(f) Contingency planning efforts for potential Advance Measures activities. Occasionally weather phenomena occur which produce a much higher than normal probability or threat of flooding which may be predicted several months in advance of occurrence or significant impact. Impacts on specific locations may be unpredictable, but regional impacts may have a high likelihood of occurrence. In such situations, the Corps may provide technical and contingency planning assistance to tribal, State, and local agencies, commensurate with the predicted weather phenomenon, based on requests for assistance from such tribal, State, and local agencies. Specific Advance Measures projects must be addressed as specified in paragraph (b) of this section.
(g) Definitions—(1) Imminent threat. A subjective statistical evaluation of how quickly a threat scenario can develop, and how likely that threat is to develop in a given geographical location. Implicit in the timing aspect can be considerations of available time (when the next flood or storm event is likely to occur), season (e.g., a snowpack that will melt in the coming spring runoff), or of known cyclical activities.
(2) Unusual flooding. A subjective determination that considers potential ability to approach an area's flood of record, a catastrophic level of flooding, or a greater than 50-year level of flooding.
Subpart G Local Interests/Cooperation Agreements
§ 203.81 General.
(a) Requirements for Cooperation Agreements. In order to maintain a firm understanding between the Corps and non-Federal interests concerning the responsibilities of each party in responding to or recovering from a natural disaster, division or district commanders shall negotiate a cooperation agreement (CA) with a non-Federal sponsor whenever assistance (other than short term technical assistance) is furnished. CA's do not require approval by HQUSACE unless they contain special or unusual conditions. For assistance to other than a public entity, a public agency is required to be the non-Federal sponsor, co-sign the agreement, and be responsible, from the Corps perspective, for accomplishment of all work and conditions required in the CA. Project sponsors must meet the definition contained in § 203.15.
(b) Request for assistance. (1) For urgent situations involving Flood Response activities, division/district commanders may respond to oral requests from responsible representatives of local interests. However, all oral requests must be confirmed in writing. Assistance can be furnished before the written statement is received.
(2) Before furnishing assistance (other than short term technical assistance) under Advance Measures, or under Emergency Water Supplies, the district/division commander must receive a request, signed by the Governor (or the Governor's representative for Emergency Water assistance due to a contaminated source), identifying the problem, verifying that all available State and local resources have been committed, and requesting Federal assistance.
§ 203.82 Requirements of local cooperation.
It is Corps policy that provision of assistance under Public Law 84-99 will, insofar as feasible, require local interests to: provide without cost to the United States all LERRD's necessary for the authorized work; hold and save the United States free from damages due to the authorized work, exclusive of damages due to the fault or negligence of the United States or its contractor; maintain and operate, in a manner satisfactory to the Chief of Engineers, all the works after completion. When assistance includes the construction of temporary protective works, the maintain and operate clause is modified by adding (or substituting, as applicable) the requirement for local interests to remove any temporary works constructed by the Corps under Public Law 84-99. If any permanent works are constructed, then the sponsor is required to operate and maintain the project in accordance with requirements determined by the Corps.
(a) Furnishing of LERRD's. This item provides for sites of structures, for borrow and disposal areas, and for access. It also provides for all other rights in, upon, through, or over private property as needed by the United States in connection with the authorized work. Performance by the local interests under their assurance to furnish LERRD's will normally not be considered a contribution. If more advantageous to the Federal Government, borrow and disposal areas may be assumed as a Federal responsibility. Easements must be provided for future Federal inspection of maintenance or removal. If a public agency sponsors a project for a non-public applicant, the applicant must provide an easement to the sponsor for future maintenance or removal, as well as for Federal inspection. Easements should extend to the life of the project.
(b) Hold and save clause. This clause serves as legal protection of the government. Where property concerned is under tenancy, both the property owner and the tenant should acknowledge the non-Federal sponsor's signed CA.
(c) Maintain and operate clause. This item is intended to protect the investment of government resources and provide proper stewardship of resources entrusted to the Corps. This clause must include: “It is understood that the foregoing maintenance and operation requirement extends to interrelated features of all protective work under the control of (insert name of sponsor, and owner if appropriate).”
(d) Removal of temporary works. Local interests are responsible for the removal of all temporary works constructed by the Corps, which are unsuitable for upgrade to permanent structures. Structures may be deemed unsuitable due to inherent health, access, or safety problems that could result from their location. The wording of this clause must not preclude the use of other Federal assistance programs to fund removal.
(e) Request for retention of temporary flood control works. Local interests may ask to retain a temporary structure for protection from future floods. This will not be approved by the Corps unless the works are upgraded to meet all Corps criteria for permanent projects. Public Law 84-99 funds will not be used to upgrade the structure. An upgraded project must comply with permitting, environmental, and other regulatory and legal requirements. Unless upgraded, such projects are not eligible for rehabilitation, and must be removed in accordance with paragraph (d) of this section. Unless upgraded, temporary projects which are not removed by the local sponsor will cause all projects with the same sponsor to lose eligibility for Public Law 84-99 assistance. Local interests must initiate action to upgrade or remove the temporary works within 30 days after the flood threat has passed.
(f) Cost sharing. (1) The Federal Government may assume up to 80 percent of the eligible construction costs for rehabilitation of non-Federal flood control projects, and up to 100 percent of the eligible construction costs for rehabilitation of Federal flood control projects. The Federal Government may assume up to 100 percent of the eligible construction costs for rehabilitation of HSPP's. Sponsors will provide their share of costs as provided for in § 203.84. The sponsor's share is in addition to providing costs for LERRD's, and any costs for correction of any deferred/deficient maintenance. The Corps will determine the dollar value of any in-kind services provided by the local sponsor.
(2) For those unusual occasions where permanent construction (vice the temporary standard) for Advance Measures projects is employed, the local sponsor will normally be required to provide 25 percent of the project cost, in addition to LERRD's.
§ 203.83 Additional requirements.
(a) Maintenance deficiencies. Rehabilitation, Emergency Water, Post Flood Response, and Advance Measures authorities may not be used to correct deferred or deficient maintenance. Such correction must be accomplished by, or at the expense of, local interests. This may include restoring normal levee or dune height after subsidence, replacement of deteriorated components such as outlet structures and pipes, removal of debris, and new construction items such as protection against erosion. This restriction on use of these authorities does not preclude furnishing flood fight assistance during an emergency.
(b) Areas of minor damage, flood control works. Separable areas with minor damage will be included in the maintenance program of local interests.
(c) Minor completion items. Local interests should be responsible for minor completion items, such as dressing fills, placing sod, or seeding completed work.
(d) Adequacy of requirements of local cooperation. In determining the adequacy of the pledge of local cooperation, district/division commanders must consider the local sponsor's performance capability, taking into account any shortcomings in meeting prior commitments. Local sponsors should make provisions to establish and provide resources for a “Contingency Fund” to meet future maintenance requirements if apparent inadequacies of protective works indicate maintenance costs will be unusually high. Local sponsors should make provisions to establish and provide resources for a “Capital Improvement Fund” to meet future costs of capital improvement projects such as replacement of culverts in levees, pump station equipment, etc.
(e) Eligibility under other Federal programs. The Cooperation Agreement must be worded to allow local interests to accept funding from other Federal programs for meeting the local responsibility. For example, removal of temporary works will be without cost under Corps Public Law 84-99 assistance, but will not be “at no cost to the United States.” Use of another Federal agency's funds is contingent upon that agency providing the Corps written assurance that such usage does not violate any existing laws or rules concerning the usage or expenditure of such funds.
§ 203.84 Forms of local participation—cost sharing.
In addition to the standard requirements of local cooperation and according to the circumstances, local participation in project work may be in the form of: contributed funds; the furnishing of materials, equipment, or services; and/or accomplishment of work either concurrently or within a specified reasonable period of time. The final terms agreed upon will be set forth in writing and made a part of the CA before commencement of work.
(a) Contributed funds. Contributed funds may be accepted, or refunded, without further reference or approval by the Chief of Engineers. The required certificate of the district commander will cite 33 U.S.C. 701h as the pertinent authority.
(b) Obligation of contributed funds. Per OMB Circular A-34, all contributed funds must be received in cash and deposited with the Treasury before any obligations can be made against such funds. Public Law 84-99 assistance for well construction is exempted from this requirement because financing is specifically authorized. However, the CA for such well construction assistance (see subpart G of this part) must be signed in advance of any obligations. To reduce administrative problems, CA terms for well construction should be for no longer a period than that which will allow for payments within the means of the applicant. Public Law 84-99 limits the term to a maximum of 30 years.
(c) Provision of work or services in kind. To the extent practicable, local interests should be allowed to minimize the amount of contributed funds by providing equivalent work or services in kind. Such services do not include LERRD's.
§ 203.85 Rehabilitation of Federal flood control projects.
Some sponsors of Federal flood control projects are not required to furnish written assurances of local cooperation, when such assurances already exist from the PCA of the original construction of the project. In lieu of a new PCA, the Corps will notify the sponsor, in writing, of the sponsor's standing requirements. These requirements include such items as LERRD's, costs attributable to deficient or deferred maintenance, removal of temporary works, cost-sharing requirements, and any other requirements contained in § 203.82. The project sponsor must acknowledge its responsibilities prior to the provision of Rehabilitation Assistance. If the existing PCA does not adequately address responsibilities, then a CA will be required.
§ 203.86 Transfer of completed work to local interests.
Responsibility for operation and maintenance of a project for which emergency work under Public Law 84-99 is undertaken will always remain with the non-Federal sponsor throughout the process, and thereafter. The Corps will notify the non-Federal sponsor by letter when repair/rehabilitation/work efforts are completed. Detailed instructions, and suggestions relative to proper maintenance and operation, may be furnished as an enclosure to this letter. The letter will remind the local interests that they are responsible for satisfactory maintenance of the flood control works in accordance with the terms of the PCA or CA. In appropriate cases for Federal projects, refer to the “Flood Control Regulation for Maintenance and Operation of Flood Control Works: (33 CFR 208)” or the project's Operation and Maintenance Manual. Reporting requirements placed on the non-Federal sponsor will vary according to organization and other circumstances.
PART 207 NAVIGATION REGULATIONS
Authority: 33 U.S.C. 1; 33 U.S.C. 555; 28 U.S.C. 2461 note.
§ 207.9 Mystic River, Mass.; dam of Commonwealth of Massachusetts, Metropolitan District Commission.
(a) Definition and authority of superintendent. The term superintendent as used in the regulations in this section shall mean himself and/or his personnel then on duty at the dam. The positioning and movements of all watercraft of every description while in the locks or within 100 yards of the locks or dam shall be subject to the direction of the superintendent whose orders must be obeyed. This order does not relieve the master of the responsibility for the safety of his vessel.
(b) Description of locks. There are three (3) locks to be used for the passage of vessels; one large lock 325 feet long, 45 feet wide, shall be used for vessels with draft up to seventeen (17) feet; two small locks each 120 feet long and 22 feet wide shall be used for boats up to six (6) feet draft.
(c) Maximum draft. Vessels drawing within six (6) inches of depth over the sills shall not be permitted lockage except under special permission of the superintendent. Every vessel using the locks and drawing more than ten (10) feet shall be accurately and distinctly marked at bow and stern showing the exact draft of water at such portions of the vessel. Gages set into the walls or the locks, both upstream and downstream of each gate, indicate the depth in feet of water over the sill of the gate.
(d) Vessels denied lockage. The superintendent may deny passage through the locks to any craft with sharp, rough projecting corners, overhanging equipment or cargo, or any craft or two that is in sinking condition or in any way unseaworthy or insufficiently manned and equipped, or any craft failing to comply with the regulations in this section or with any orders given in pursuance thereof.
(e) Protection of lock gates. (1) In no case shall boats be permitted to enter or leave any of the locks until directed to do so by the superintendent. Boats shall not be permitted to enter or start to leave until the lock gates are at rest within the gate recesses. All persons, whether in charge of vessels or not, are prohibited from willfully or carelessly damaging the locks or any of the appurtenances or the grounds adjacent thereto, and from throwing or allowing any material of any kind to fall from the barge, scow or other vessel into the locks.
(2) No person shall permit or suffer any vessel, scow, raft, or float to come in contract with any gate or any of the locks of the Amelia Earhart Dam.
(f) Damage to walls. The sides of all craft passing through the locks must be free from projection of any kind which might injure the lock walls. All craft must be provided with suitable fenders. One or more men as the superintendent may direct shall be kept at the head of every tow until it has cleared the lock and guide walls, and shall protect the walls by use of the fenders.
(g) Unnecessary delay at locks. No person shall cause or permit any craft of which he is in charge to remain in the locks or their approaches for a longer period of time than is necessary for the passage of the locks unless he is especially permitted to do so by the superintendent, and if such craft is, in the opinion of such superintendent, in a position to obstruct navigation, it shall be removed at once as requested or directed by the superintendent.
(h) Procedure at locks. The locks shall be operated promptly for the passage of all craft upon signal, excepting only in such cases as are specifically provided for in the regulations in this section. All registered merchant vessels shall pass through the locks in the order directed by the superintendent. Other craft shall be allowed to pass through the locks at the discretion of the superintendent.
(i) Navigation of the locks. (1) All barges navigating the locks whether approaching or leaving the locks are required to be assisted by one or more tugs of sufficient power to insure full control at all times. All craft approaching the locks while any other vessel going in the opposite direction is in or about to enter shall be stopped where they will not obstruct the free passage of such other vessel.
(2) All vessels over 100 gross tons including those which are accompanied by towboats must attach not less than two good and sufficient lines, cables, or hawsers to the bollards or other fixtures provided for the purpose to check the speed of the vessel and to stop it as soon as it has gone far enough to permit the lock gate behind it to be closed. Each line, cable, or hawser shall be attended on board while passing into the lock by one or more of the vessel's crew. Where vessels are so long that in order to get them wholly within the locks it is necessary to go within 100 feet of the lock gate ahead, the speed of the vessel must be slow and the vessel must be fully under control at all times by the lines, cables or hawsers. All towboats and vessels less than 100 gross tons may enter the locks without having lines out subject to the discretion of the superintendent. The master or person in charge of a vessel shall arrange to have any line, cable, or hawser handed or thrown from the lock walls by the superintendent, or his assistants, made fast on the vessel as requested or directed, so that in cases of emergency such line, cable, or hawser may also be used to check the speed of and stop the vessel.
(3) Operators of vessels less than 200 gross tons may use the floating moorings in the large lock to fasten lines or hawsers, but they shall not be used to check the way on any vessel greater than 30 gross tons.
(4) Vessels less than 30 gross tons may fasten lines to the floating moorings in the large or small locks. All persons shall keep off the floating moorings at all times.
(5) No line shall be attached to anything on or a part of the dam except the fixtures provided for this purpose.
(6) Equipment of each craft shall include a sufficient bow line and stern line.
(j) Mooring. When a craft is in position in the lock, it shall be securely fastened in a manner satisfactory to the superintendent to prevent the craft moving about while the lock is being filled or emptied, and the lines, cables, or hawsers used for this purpose shall be attended as far as is necessary or required while the filling or emptying is in progress.
(k) [Reserved]
(l) Signals. (1) All craft desiring lockage shall, on approaching the locks, signal by two long and two short blasts of a whistle or other sound device. Two long blasts from the lock in reply will indicate a delayed opening and direct the craft not to enter the lock.
(2) Lights are located at each end of each lock and will normally show red. No vessel shall come within 100 feet of the outside of any gate when the signal is red except when so directed by the superintendent.
(3) Fireboats and craft owned by the U.S. Government shall be given prompt and preferential lockage when they sound four long blasts.
(4) No vessel shall move into or out of any lock until the controlling signal is green. A green light in addition to audio loud speakers, operated by the superintendent or his assistants, will direct craft through the locks.
(5) It shall be the duty of every master or person in charge of any vessel to ascertain by personal observation that the lock gate is fully open before proceeding.
(m) Operating machinery. Lock employees only shall be permitted to operate the lock gates, signals or other appliances. No person shall deface or injure any part of the Amelia Earhart Dam, or any pier, wall or other structure or any mechanism connected therewith; nor shall any person, without the consent of the superintendent, make fast to the dam, guard, guide wall, pier, or any appurtenance thereof any vessel, scow, raft, or float.
(n) Vessel to carry regulations. A copy of the regulations in this section shall be kept at all times on board each vessel regularly engaged in navigating the locks. Copies may be obtained without charge from the superintendent; the Commonwealth of Massachusetts, M.D.C. Parks Division, Boston, Mass.; New England Division, Corps of Engineers, Division Engineer, Waltham, Mass.
[32 FR 8716, June 17, 1967, as amended at 56 FR 13764, Apr. 4, 1991]
§ 207.10 Charles River, Mass.; dam of Charles River Basin Commission.
(a) The movements of all vessels or boats in and near the lock shall be under the direction of the superintendent in charge of these structures and his assistants, whose orders and signals shall be obeyed.
(b) Every vessel using the lock and drawing more than 10 feet shall be accurately and distinctly marked at the bow and stern, showing the exact draft of water at such portions of the vessel.
(c) All steam vessels desiring to pass through the lock shall signal for the same by two long and two short blasts of the whistle.
(d)(1) All vessels passing through the lock shall have their outboard spars, if any, rigged in, and booms amidships, and secured. All standing and running rigging must be triced in to keep it from blowing out and fouling the drawbridge. Every vessel of 200 tons and under shall be provided with at least two, and every vessel of more than 200 tons shall be provided with at least four good and sufficient lines, cables, or hawsers. Anchors shall either be stowed or shall hang from hawse pipes, hauled up close, clear of the water if possible. Vessels with anchors under foot or hanging from catheads will not be permitted to enter the lock.
(2) All vessels must be sufficiently manned and must have a sufficient number of round and fore-and-aft fenders to protect the lock from injury. All heavy rope fenders must be securely lashed to prevent their falling into the lock and interfering with the gates.
(e) All vessels approaching the lock while any other vessel going in the opposite direction is in or about to enter it shall be stopped where they will not obstruct the free passage of such other vessel.
(f) It shall be the duty of every master or person in charge of any vessel upon approaching the lock from the upstream end to ascertain by personal observation whether or not the upper lock gate is open, and a vessel shall not be permitted to come within 100 feet of the upper lock gate until the gate has been wholly withdrawn into its recess.
(g) All towboats, whether towing or not, and other steam vessels of less than 100 tons gross may enter the lock under their own power and without having lines out, but all other vessels, including those which are accompanied by towboats, must attach not less than two good and sufficient lines, cables, or hawsers to the bollards or other fixtures provided for the purpose to check the speed of the vessel and to stop it as soon as it has gone far enough to permit the lock gate behind it to be closed, and each line, cable, or hawser shall be attended on board while passing into the lock by one or more of the vessel's crew. Where vessels are so long that in order to get them wholly within the lock it is necessary to approach within 150 feet of the lock gate ahead, the speed of the vessel must be slow and fully under control by the lines, cables, or hawsers. Steam vessels of more than 100 tons gross, not including towboats, will not be permitted to turn their propellers on entering the lock after the bow of the vessel has entered, but will be drawn in by means of capstans on the lock walls or otherwise, and their speed must be checked and the vessel stopped by lines, cables, or hawsers as in other cases. All steam vessels may leave the lock under their own power. The master or person in charge of a vessel shall arrange to have any line, cable, or hawser handed or thrown from the lock walls by the superintendent or his assistants, made fast on the vessel as requested or directed, so that in cases of emergency such line, cable, or hawser may also be used to check the speed of and stop the vessel.
(h) When a vessel is in position in the lock it shall be securely fastened in a manner satisfactory to the superintendent, or his assistant in charge of the lock at the time, to prevent the vessel from moving about while the lock is being filled or emptied, and the lines, cables, and hawsers used for this purpose shall be attended as far as is necessary or required while the filling or emptying is in progress.
(i) No vessel which has iron or irons projecting from it or lumber or other cargo projecting over its sides shall enter the lock, except at such time and with such precautions to prevent damage to the lock or its appurtenances as the superintendent, or the assistant in charge of the lock at the time, may require.
(j) All persons, whether in charge of vessels or not, are prohibited from willfully or carelessly damaging the lock, any of its appurtenances or the grounds adjacent thereto, and from throwing any material of any kind into the lock. No line shall be attached to anything except the bollards and other fixtures provided for the purpose.
(k) Upon each passage through the lock, the master or clerk of a vessel shall make a statement of the kind and tonnage of the freight carried.
(l) No person shall cause or permit any vessel or boat of which he is in charge to remain in the lock or its approaches for a longer time than is necessary for the passage of the lock, unless he is especially permitted to do so by the superintendent or the assistant in charge of the lock at the time, and if such vessel or boat is, in the opinion of such superintendent or assistant, in a position to obstruct navigation it shall be removed at once as requested or directed by such superintendent or assistant.
(m) All registered merchant vessels shall pass through the lock in the order directed by the superintendent or the assistant in charge of the lock at the time. Unregistered craft will not be allowed to pass through the lock separately unless especially permitted by such superintendent or assistant.
(n) The lock shall be operated promptly for the passage of all vessels upon signal excepting only in such cases as are specifically provided for in this section.
[Regs., May 6, 1909]
§ 207.20 Cape Cod Canal, Mass.; use, administration, and navigation.
(a) Limit of Canal. The canal, including approaches, extends from the Canal Station Minus 100 in Cape Cod Bay, approximately one and six-tenths (1.6) statute miles seaward of the Canal Breakwater Light, through dredged channels and land cuts to Cleveland Ledge Light in Buzzards Bay approximately four (4) statute miles southwest of Wings Neck.
(b) Supervision. (1) The movement of ships, boats and craft of every description through the canal and the operation and maintenance of the waterway and all property of the United States pertaining thereto shall be under the supervision of the Division Engineer, U.S. Army Engineer Division, New England, Corps of Engineers, Waltham, Massachusetts, or the authorized representative of the division engineer, the Engineer-In-Charge of the Cape Cod Canal. The division engineer or the Engineer-In-Charge from time to time will prescribe rules governing the dimensions of vessels which may transit the waterway, and other special conditions and requirements which will govern the movement of vessels using the waterway.
(2) The Engineer-In-Charge, through the marine traffic controller on duty, will enforce these regulations and monitor traffic through the canal. The marine traffic controller on duty is the individual responsible for interpretation of these regulations with respect to vessels transiting the canal. Vessels transiting the canal must obey the orders of the marine traffic controller.
(3) The government has tugs stationed at the West Boat Basin for emergency use on an on-call basis. A patrol vessel is manned and operational 24-hours a day.
(c) Communications. There is a marine traffic controller on duty 24 hours a day, seven days a week, in the traffic control center located at the Canal Administrative Office. The primary method of communications between the canal and vessels transiting will be by VHF-FM Marine radio. The traffic controller can also be contacted by telephone.
(1) For radio communications, call the traffic controller on channel 16 to establish contact. The transmissions will then be switched to channel 12 or 14 as the working channel to pass information. Channel 13 is also available at the canal office; however, the use of channel 13 should be limited to emergency situations or whenever vessels do not have one of the other channels. All four channels are monitored continuously by the traffic controller. Radio discipline will be adhered to in accordance with FCC rules and regulations.
(2) For telephone communications with the traffic controller, call (617) 759-4431.
(3) Vessels shall maintain a radio guard on Marine VHF-FM channel 13 during the entire passage through the canal.
(4) All radio communications in the vicinity of the canal are tape recorded for future reference.
(d) Vessels allowed passage. The canal is open for passage to all adequately powered vessels properly equipped and seaworthy, of sizes consistent with safe navigation as governed by the controlling depths and widths of the channel and the vertical and horizontal clearances of the bridges over the waterway. The granting of permission for any vessel to proceed through the waterway shall not relieve the owners, agents and operators of full responsibility for its safe passage. No vessel having a greater draft forward than aft will be allowed to transit the canal. Craft of low power and wind driven are required to have and use auxiliary power during passage throughout the canal as defined in paragraph (a) of this section. Low powered vessels will be required to await slack water or favorable current for canal transit.
(e) Tows. (1) Tows shall be made-up outside the canal entrances. All vessels engaged in towing other vessels not equipped with a rudder shall use two lines or a bridle and one tow line. If the vessel in tow is equipped with a rudder or a ship shaped bow, one tow line may be used. All tow lines of hawsers must be hauled as short as practicable for safe handling of the tows. No towboat will be allowed to enter the waterway with more than two barges in tow unless prior approval is granted by the Engineer-In-Charge; requests must be submitted 12 hours in advance of the passage.
(2) The maximum length of pontoon rafts using the canal will be limited to 600 feet, and the maximum width to 100 feet. Pontoon rafts exceeding 200 feet in length will be required to have an additional tug on the stern to insure that the tow is kept in line. The tugs used must have sufficient power to handle the raft safely.
(3) Dead ships are required to transit the canal during daylight hours and must be provided with the number of tugs sufficient to afford safe passage through the canal. (A dead ship will not be allowed to enter the canal unless prior approval is granted by the Engineer-In-Charge; requests must be submitted 12 hours in advance of the passage).
(f) Dangerous cargoes. The master or pilot of any vessel or tow carrying dangerous cargoes must notify the Marine Traffic Controller prior to entering the canal. Dangerous cargoes are defined as those items listed in 33 CFR 126.10 when carried in bulk (i.e., quantities exceeding 110 U.S. gallons in one tank) plus Class A explosives (commercial or military) as listed in 49 CFR 173.53 (commercial) and 46 CFR 146.29-100 (military), liquified natural gas and liquified petroleum gas. Transportation of dangerous cargoes through the canal shall be in strict accordance with existing regulations prescribed by law. In addition, vessels carrying dangerous cargoes shall comply with the following requirements.
(1) They must have sufficient horsepower to overcome tidal currents or they will be required to wait for favorable current conditions.
(2) Transits will be during daylight hours.
(3) No transit will be permitted when visibility conditions are unstable or less than 2 miles at the approaches and throughout the entire length of the canal.
(4) Transits must await a clear canal for passage.
(g) Obtaining clearance. (1) Vessels under 65 feet in length may enter the canal without obtaining clearance. All craft are required to make a complete passage through the canal except excursion craft which may operate and change direction within the canal in accordance with procedures coordinated with the marine traffic controller on duty. When the railroad bridge span is in the closed (down) position, all vessels are directed not to proceed beyond the points designated by stop signs posted east and west of the railroad bridge. Vessels proceeding with a fair tide (with the current) should turn and stem the current at the designated stop points until the railroad bridge is in the raised (open) position.
(2) Vessels 65 feet in length and over shall not enter the canal until clearance has been obtained from the marine traffic controller by radio. See paragraph (c) “Communications” for procedures. If a vessel, granted prior clearance, is delayed or stops at the mooring basins, state pier, or the Sandwich bulkhead, a second clearance must be obtained prior to continuing passage through the canal.
(3) Vessels will be given clearance in the order of arrival, except when conditions warrant one-way traffic, or for any reason an order of priority is necessary, clearance will be granted in the following order.
(i) First—To vessels owned or operated by the United States, including contractors' equipment employed on canal maintenance or improvement work.
(ii) Second—To passenger vessels.
(iii) Third—To tankers and barges docking and undocking at the Canal Electric Terminal.
(iv) Fourth—To merchant vessels, towboats, commercial fishing vessels, pleasure boats and miscellaneous craft.
(4) Procedures in adverse weather: Vessels carrying flammable or combustible cargoes as defined in 46 CFR 30.25 will be restricted from passage through the canal when visibility is less than 1/2 mile. Other vessels may transit the canal in thick weather by use of radar with the understanding that the U.S. Government will assume no responsibility: And provided, That clearance has been obtained from the marine traffic controller.
(h) Traffic lights. There are three sets of traffic lights showing red, green, and yellow that are operated on a continuous basis at the canal. The traffic lights apply to all vessels 65 feet in length and over. The traffic lights are a secondary system that is operated in support of the radio communications system. The traffic lights are located at the easterly canal entrance, Sandwich, and at the westerly entrance to Hog Island Channel at Wings Neck. A third traffic light is located at the Canal Electric Terminal basin on the south side of the canal in Sandwich, and applies only to vessels arriving and departing that terminal.
(1) Westbound traffic. When the green light is on at the eastern (Cape Cod Bay) entrance, vessels may proceed westward through the canal. When the red light is on, any type of vessel 65 feet in length and over must stop clear of the Cape Cod Bay entrance channel. When the yellow light is on, vessels 65 feet in length and over and drawing less than 25 feet may proceed as far as the East Mooring Basin where they must stop. Prior to continuing passage through the canal, clearance must be obtained from the marine traffic controller.
(2) Eastbound traffic. When the green light is on at Wings Neck, vessels may proceed eastward through the canal. When the red light is on, vessels 65 feet and over in length and drawing less than 25 feet must keep southerly of Hog Island Channel Entrance Buoys Nos. 1 and 2 and utilize the general anchorage areas adjacent to the improved channel. Vessel traffic drawing 25 feet and over are directed not to enter the canal channel at the Cleveland Ledge Light entrance and shall lay to or anchor in the vicinity of Buzzards Bay Buoy No. 11 (FLW & Bell) until clearance is granted by the canal marine traffic controller or a green traffic light at Wings Neck is displayed. When the yellow light is on, vessels may proceed through Hog Island Channel as far as the West Mooring Basin where they must stop. Prior to continuing passage through the canal, clearance must be obtained from the marine traffic controller.
(i) Railroad Bridge Signals. The following signals at the Buzzards Bay Railroad Bridge will be given strict attention.
(1) The vertical lift span on the railroad bridge is normally kept in the raised (open) position except when it is lowered for the passage of trains, or for maintenance purposes. Immediately preceding the lowering of the span, the operator will sound two long blasts of an air horn. Immediately preceding the raising of the span, the operator will sound one long blast of an air horn. When a vessel or craft of any type is approaching the bridge with the span in the down (closed) position and the span cannot be raised immediately, the operator of the bridge will so indicate by sounding danger signals of four short blasts in quick succession.
(2) When the lift span is in the down (closed) position in foggy weather or when visibility is obscured by vapor, there will be four short blasts sounded from the bridge every two minutes.
(j) Speed. All vessels are directed to pass mooring and boat basin facilities, the state pier, and all floating plant engaged in maintenance operations of the waterway at a minimum speed consistent with safe navigation. In order to coordinate scheduled rail traffic with the passage of vessels, to minimize erosion of the canal banks and dikes from excessive wave wash and suction, and for the safety of vessels using the canal, the following speed regulations must be observed by vessels of all types, including pleasure craft. The minimum running time for the land cut between the East Mooring Basin (Station 35) and the Administration Office in Buzzards Bay (Station 388) is prescribed as follows:
Head Tide—60 Minutes Fair Tide—30 Minutes Slack Tide—45 Minutes
The minimum running time between the Administration Office (Station 388) and Hog Island Channel westerly entrance Buoy No. 1 (Station 661) is prescribed as follows:
Head Tide—46 Minutes Fair Tide—23 Minutes Slack Tide—35 Minutes
The running time at slack water will apply to any vessel which enters that portion of the canal between stations 35 and 661, within the period of one-half hour before or after the predicted time of slack water as given in the National Ocean Survey publication “Current Tables, Atlantic Coast, North America.” The minimum running time during a head tide or a fair tide shall apply to any vessel which enters that portion of the canal between Station 35 and 661 at any time other than designated above for time requirements at slack tide. Vessels of any kind unable to make a through transit of the land cut portion of the canal against a head current of 6.0 knots within a maximum time limit of 2 hours 30 minutes shall be required to obtain the assistance of a helper tug at the vessel owner's expense or await favorable tide conditions prior to receiving clearance from the marine traffic controller. In the event vessels within the confines of the canal fail to perform and are unable to make sufficient headway against the currents, the marine traffic controller may activate a helper tug in accordance with paragraph (k) of this section.
(k) Management of vessels. (1) Vessels within the limits of the canal shall comply with applicable navigation rules.
(2) Vessels within the limits of the canal shall comply with the applicable requirements for the use of pilots established by the Coast Guard, including but not limited to those contained in 46 CFR 157.20-40. Vessels will not be granted clearance to enter the canal until the marine traffic controller has been notified of the name of the pilot who will be handling the vessel.
(3) The master of a vessel will be responsible for notifying the marine traffic controller as soon as an emergency situation appears to be developing. When in the opinion of the marine traffic controller an emergency exists, he/she can require the master to accept the assistance of a helper vessel. Whether or not assistance is provided by a government vessel or by a private firm under contract to the government, the government reserves the right to seek compensation from the vessel owners for all costs incurred.
(4) Right-of-Way: All vessels proceeding with the current shall have the right-of-way over those proceeding against the current. All craft up to 65 feet in length shall be operated so as not to interfere with the navigation of vessels of greater length.
(5) Passing of vessels: The passing of one vessel by another when proceeding in the same direction is prohibited except when a leading low powered ship is unable to make sufficient headway. However, extreme caution must be observed to avoid collision, and consideration must be given to the size of the ship to be overtaken, velocity of current and wind, and atmospheric conditions. Masters of vessels involved shall inform the marine traffic controller on duty of developing situations to facilitate coordination of vessel movement. Meeting or passing of vessels at the easterly end of the canal between Station Minus 40 and Station 60 will not be permitted, except in cases of extreme emergency, in order to allow vessels to utilize the center line range to minimize the effects of hazardous eddies and currents. Due to bank suction and tidal set, meeting and passing of vessels at the following locations will be avoided:
(i) Sagamore Bridge.
(ii) Bourne Bridge.
(iii) Railroad Bridge.
(iv) Mass Maritime Academy.
(6) Unnecessary delay in canal: Vessels and other type crafts must not obstruct navigation by unnecessarily idling at low speed when entering or passing through the canal.
(7) Stopping in the waterway: Anchoring in the Cape Cod Canal Channel is prohibited except in emergencies. For the safety of canal operations it is mandatory that the masters of all vessels anchoring in or adjacent to the canal channel (Cape Cod Bay to Cleveland Ledge Light) for any reason, immediately notify the marine traffic controller.
(8) Utilization of mooring and boat basins and the Sandwich Bulkhead: Vessels mooring or anchoring in the mooring or boat basins at the Sandwich bulkhead must do so in a manner not to obstruct or impede vessel movements to and from facilities. These facilities are of limited capacity and permission to occupy them for periods exceeding 24 hours must be obtained in advance from the marine traffic controller. Mooring in the West Boat Basin at Buzzards Bay, near the railroad bridge, is not permitted except in an emergency. Fishing boats, yachts, cabin cruisers and other craft utilizing the East Boat Basin on the south side of the canal at Sandwich, Massachusetts are not permitted to tie up at the Corps of Engineers landing float or anchor in a manner to prevent canal floating plant from having ready access to the float. All vessels or barges left unattended must be securely tied with adequate lines or cables. The United States assumes no liability for damages which may be sustained by any craft using the bulkhead at Sandwich or the canal mooring or boat basin facilities. Vessels shall not be left unattended along the face of the government bulkhead. A responsible person with authority to authorize and/or accomplish vessel movement must remain onboard at all times.
(l) Grounded, wrecked or damaged vessels. In the event a vessel is grounded, or so damaged by accident as to render it likely to become an obstruction and/or hazard to navigation in the waterway, the division engineer or the division engineer's authorized representative shall supervise and direct all operations that may be necessary to remove the vessel to a safe locality.
(m) [Reserved]
(n) Deposit of refuse. No oil or other allied liquids, ashes, or materials of any kind shall be thrown, pumped or swept into the canal or its approaches from any vessel or craft using the waterway, nor shall any refuse be deposited on canal grounds, marine structures, or facilities.
(o) Trespass to property. Subject to the provisions of paragraph (q) of this section trespass upon the canal property is prohibited.
(p) Bridges over the canal. The government owns, operates and maintains all bridges across the canal which include one railroad bridge and two highway bridges. The division engineer or his/her authorized representative may establish rules and regulations governing the use of these bridges.
(q) Recreational use of canal—(1) Policy. (i) It is the policy of the Secretary of the Army acting through the Chief of Engineers to provide the public with safe and healthful recreational opportunities within all water resource development projects administered by the Chief of Engineers, including the canal and government lands part thereof. Any recreational use of the canal and those lands shall be at the users own risk.
(ii) All water resource development projects open for recreational use shall be available to the public without regard to sex, race, creed, color or national origin. No lessee, licensee, or concessionaire providing a service to the public shall discriminate against any person or persons because of sex, race, creed, color or national origin in the conduct of operations under the lease, license or concession contract.
(2) Motor vehicles. Operation of motor vehicles, motorcycles, minibikes, mopeds, motorbikes, snowmobiles, and all types of off-road vehicles is prohibited on government lands and service roads except in areas specifically designated for such operation.
(3) Swimming. Swimming, skin diving, snorkeling, and scuba diving in the canal between the east entrance in Cape Cod Bay and the west entrance at Cleveland Ledge Light are prohibited. Diving operations may be authorized by the Engineer-In-Charge in conjunction with operation and maintenance of the canal.
(4) Camping. Overnight tenting or camping on government land is prohibited except in areas designated by the division engineer. Bourne Scenic Park and Scusset Beach State Reservation are designated camping areas. Persons asleep during hours of darkness in or out of vehicles shall be considered as campers.
(5) Fishing. Persons may fish with rod and line from the banks of the canal on Federally owned property except areas designated by the division engineer. Fishing and lobstering by boat in the Cape Cod Canal between the east entrance in Cape Cod Bay and the west entrance at Cleveland Ledge Light are prohibited. Fishing by boat is permitted in the area west of the State Pier in Buzzards Bay, provided that all craft stay out of the channel defined by U.S. Coast Guard buoys and beacons. Fish and game laws of the United States and the Commonwealth of Massachusetts will be enforced.
(6) Hunting. Hunting is permitted in accordance with game laws of the United States and the Commonwealth of Massachusetts.
(7) Fires. No open fires will be allowed at any time except by special permission and then shall be continuously overseen and in compliance with state or town laws.
(8) Control of animals and pets. (i) No person shall bring or have horses in camping, picnic, swimming beaches or developed recreation areas.
(ii) No person shall bring dogs (except seeing eye dogs), cats, or other pets into developed recreation areas unless penned, caged, or on a leash no longer than six feet or otherwise under physical restrictive controls at all time.
(9) Restrictions. (i) The division engineer may establish a reasonable schedule of visiting hours for all or portions of the project area and close or restrict the public use of all or any portion of the project by the posting of appropriate signs indicating the extent and scope of closure. All persons shall observe such posted restrictions.
(ii) The operation or use of any audio or other noise producing device including, but not limited to, communications media and vehicles in such a manner as to unreasonably annoy, endanger persons or affect vessel traffic through the canal is prohibited.
(10) Explosives, firearms, other weapons and fireworks. (i) The possession of loaded firearms, ammunition, projectile firing devices, bows and arrows, crossbows, and explosives of any kind is prohibited unless in the possession of a law enforcement officer or Government employee on official duty or used for hunting during the hunting season as permitted under paragraph (q)(6) of this section, or unless written permission has been received from the division engineer.
(ii) The possession or use of fireworks is prohibited unless written permission has been received from the division engineer.
(11) Public property. Destruction, injury, defacement or removal of public property including natural formations, historical and archeological features and vegetative growth is prohibited without written permission of the division engineer.
(12) Abandonment of personal property. (i) Abandonment of personal property is prohibited. Personal property shall not be left unattended upon the lands or waters of the project except in accordance with this regulation. After a period of 24 hours, abandoned or unattended personal property shall be impounded and stored at a storage point designated by the division engineer. The division engineer shall assess a reasonable impoundment fee, which shall be paid before the impounded property is returned to its owners.
(ii) The division engineer shall, by public or private sales or otherwise, dispose of all lost, abandoned, or unclaimed personal property that comes into his/her custody or control. However, efforts should be made to find the owner, the owner's heirs or next of kin, or legal representatives. If the owner, heirs or next of kin, or legal representative is determined but not found, the property may not be disposed of until the expiration of 120 days after the date when notice, giving the time and place of the intended sale or other disposition, has been sent by certified or registered mail to that person at last known address. When diligent effort to determine the owner, owner's heirs or next of kin, or legal representative is unsuccessful, the property may be disposed of without delay, except that if it has a fair market value of $25 or more the property generally may not be disposed of until three months after the date it is received at the Cape Cod Canal Administrative Office. The net proceeds from the sale of property shall be placed into the Treasury of the United States as miscellaneous receipts.
(13) Lost and found articles. All abandoned/lost articles shall be deposited by the finder at the Canal Administration office or with Canal ranger. The finder shall leave his/her name, address, and phone number. All lost articles shall be disposed of in accordance with procedures set forth in paragraph (q)(12) of this section.
(14) Advertisement. Advertising by the use of billboards, signs, markers, audio devices or any other means whatever is prohibited unless written permission has been received from the division engineer.
(15) Commercial activities. The engaging in or solicitation of business without the written permission of the division engineer is prohibited.
(16) Unauthorized structures. The construction or placing of any structure of any kind under, upon or over the project lands or water is prohibited unless a permit has been issued by the division engineer. Structures not under permit are subject to summary removal by the division engineer.
(17) Special events. Prior approval must be obtained from the Engineer-In-Charge for special events, recreational programs and group activities. The public shall not be charged any fee by the sponsor of such event unless the division engineer has approved in writing the proposed schedule of fees.
(18) Interference with government employees. Interference with any government employee in the conduct of official duties pertaining to the administration of these regulations is prohibited.
[45 FR 51552, Aug. 4, 1980; 45 FR 60430, Sept. 12, 1980, as amended at 56 FR 13765, Apr. 4, 1991]
§ 207.50 Hudson River Lock at Troy, N.Y.; navigation.
(a) Authority of lockmaster. The lockmaster shall be charged with the immediate control and management of the lock, and of the area set aside as the lock area, including the lock approach channels. He shall see that all laws, rules and regulations for the use of the lock and lock area are duly complied with, to which end he is authorized to give all necessary orders and directions in accordance therewith, both to employees of the Government and to any and every person within the limits of the lock or lock area, whether navigating the lock or not. No one shall cause any movement of any vessel, boat, or other floating thing in the lock or approaches except by or under the direction of the lockmaster or his assistants.
(b) Signals. Steamboats or tows desiring lockage in either direction shall give notice to the lock tenders, when not more than three-fourths mile from the lock, by one long blast of (10 seconds' duration), followed by one short blast (of three seconds' duration), or a whistle or horn. When the lock is ready for entrance a green light will be shown from the river wall. An amber light will indicate that the lock is being made ready for entrance. A red light will indicate that the approaching vessel must wait. Whenever local conditions make it advisable the visual signals will be supplemented by sound signals as follows:
(1) One long blast of a horn to indicate that the vessel must wait.
(2) One short blast of a horn to indicate that the lock is being made ready for entrance.
(3) Two short blasts of a horn to indicate permission to enter the lock.
(4) Four short and rapid blasts to attract attention, indicate caution, and signal danger.
(c) Draft of boats. Deep-draft boats must clear the miter sills by at least 3 inches. Boats drawing too much water will not be allowed to lighter cargo in the entrances.
(d) Precedence at the lock. The vessel arriving first at the lock shall be first to lock through; but precedence shall be given to vessels belonging to the United States and to commercial vessels in the order named. Arrival posts or markers may be established ashore above or below the lock. Vessels arriving at or opposite such posts or markers will be considered as having arrived at the lock within the meaning of this paragraph. If the traffic is crowded in both directions; up and down lockages will usually be made alternately, but the lock tender may permit two or more lockages to be made at one time in the same direction when this will not cause unreasonable delay. In case two or more boats or tows are to enter for the same lockage, they shall enter as directed by the lock tender. No boat shall run ahead of another while in the lock. The boat that enters first shall leave first.
(e) Lockage of pleasure boats. The lockage of pleasure boats, house boats or like craft shall be expedited by locking them through with commercial craft (other than barges carrying gasoline or highly hazardous materials) in order to utilize the capacity of the lock to its maximum. Lockage of pleasure craft may be made with commercial craft carrying petroleum products other than gasoline, provided a clear distance of at least 100 feet between such vessels can be maintained in the lock. If, after the arrival of such craft, no separate or combined lockage can be accomplished within a reasonable time, not to exceed the time required for three other lockages, then separate lockage shall be made.
(f) Stations while waiting. Boats waiting their turn to enter the lock must lie at a sufficient distance from the lock and in such a position as to leave sufficient room for the passage of boats leaving the lock.
(g) Unnecessary delay. (1) Boats must not cause delay in entering or leaving the lock. Masters and pilots will be held to a strict accountability in this matter, and those with tows must provide enough men to move barges promptly. Boats failing to enter the lock with reasonable promptness after being signaled will lose their turn.
(2) Tugboats arriving with their tows in a condition which will delay locking shall lose their turn if so ordered by the lock tender. Leaking boats may be excluded until put in shape to be passed through safely.
(h) Mooring. Boats in the lock or waiting in the entrance shall be moored where directed by the lock tender, by bow, stern, and spring lines, to the snubbing posts or line hooks. Tying boats to the lock ladders is strictly prohibited.
(i) Protection of lock gates. Boats will not be permitted to enter or leave the lock until the lock gates are at rest in the gate recesses and the lock tender has directed the boat to start.
(j) Damage to walls, etc. All craft passing through the lock must be free from projections or sharp corners which might scar the walls or injure other parts. Steamboats must be provided with suitable fenders, etc. One man shall be kept at the head of every tow till it has cleared the lock and guide walls, and shall use the fender to prevent scarring the walls.
(k) Handling machinery. None but employees of the United States will be allowed to move any valve, gate, or other machinery belonging to the lock.
(l) Refuse in lock. Throwing ashes, refuse, or other obstruction in the entrances or in the lock, or on the walls thereof, and passing coal from flats or barges to a steamboat while in the lock is prohibited.
(m) [Reserved]
(n) Trespass on U.S. property. Trespass on U.S. property, or willful injury to the banks, masonry, fences, trees, houses, machinery, or other property of the United States at or near the lock is strictly prohibited.
(o) Penalties. In addition to the penalties prescribed by law, boats which fail to comply with the regulations in this section will thereafter be refused lockage until assurances have been received, satisfactory to the District Engineer, Corps of Engineers, New York, New York, that the regulations will be complied with.
[Regs., Mar. 24, 1916, as amended at 16 FR 7210, July 24, 1951; 26 FR 352, Jan. 18, 1961; 56 FR 13765, Apr. 4, 1991]
§ 207.60 Federal Dam, Hudson River, Troy, N.Y.; pool level.
(a) Whenever the elevation of the pool created by the Federal dam at Troy, N.Y., shall fall to a point level with the crest of the main spillway, the elevation of which is + 14.33 feet mean sea level, the operation of the power plant shall cease and further operation thereof shall be suspended until such time as the water level rises to or above + 14.43 feet mean sea level.
(b) Flashboards may be maintained on the section of the spillway of the dam having an elevation of + 14.33 feet mean sea level in order to increase the elevation of this section to an elevation equal to that of the auxiliary spillway, or + 16.33 feet mean sea level: Provided, That the flashboards are so erected as to drop automatically when the pool level rises to an elevation of + 18.5 feet mean sea level, and conform in other respects to the plans attached thereto.
(c) The tide staff to be used in determining the elevation of the pool shall be the ceramic tide staff now located on the westerly face of the east lock wall north of the northerly gates, the zero of which is set 2 feet below mean sea level.
(d) The regulations of the pool level and the maintenance of flashboards shall be subject to the supervision and approval of the District Engineer, New York City.
[Regs., Dec. 2, 1924, as amended at 25 FR 8907, Sept. 16, 1960]
§ 207.100 Inland waterway from Delaware River to Chesapeake Bay, Del. and Md. (Chesapeake and Delaware Canal); use, administration, and navigation.
(a) Applicability. The regulations in this section are applicable to that part of the inland waterway from Delaware River to Chesapeake Bay, Del. and Md., between Reedy Point, Delaware River, and Old Town Point Wharf, Elk River.
(b) Supervision. The District Engineer, Corps of Engineers, Philadelphia, Pa., has administrative supervision over the waterway and is charged with the enforcement of these regulations. The District Engineer from time to time will prescribe rules governing the dimensions of vessels which may transit the waterway, and other special conditions and requirements which will govern the movement of vessels using the waterway. The District Engineer's representative is the Chesapeake City Resident Engineer. The Chesapeake City Resident Engineer through the dispatcher on duty will enforce these regulations and monitor traffic through the canal.
(c) Safe navigation required. Clearance for any vessel to enter or pass through any part of the waterway will be contingent on the vessel's having adequate personnel, machinery, and operative devices for safe navigation. In the event of question as to the ability of any vessel to navigate the waterway safely, a ruling will be made by the dispatcher. The owner, agent, master, pilot, or other person in charge of the vessel concerned may appeal the dispatcher's ruling to the District Engineer whose decision shall be final. A clearance by the dispatcher for a vessel's passage through the waterway shall not relieve the owners, agents, and operators of the vessel of full responsibility for its safe passage.
(d) Radio equipment. Requirements for radio equipment on vessels transiting the waterway are as described in rules governing traffic through the waterway issued by the District Engineer. Vessels not having the mandatory radio equipment will not be permitted to transit the canal.
(e) Anchorage and wharfage facilities. The anchorage basin at Chesapeake City and free wharfage facilities on the west side of the anchorage basin are available for small vessels only. These facilities are of limited capacity, and permission to occupy them for periods exceeding 24 hours must be obtained in advance from the dispatcher at Chesapeake City.
(f) Projections from vessels. No vessel carrying a deck load which overhangs or projects beyond the sides of the vessel will be permitted to enter or pass through the waterway. Vessels carrying rods, poles, or other gear extending above the top of the vessel's mast will be required to lower such equipment to a level with the top of the mast before entering the waterway.
(g) [Reserved]
(h) Tows—(1) Integrated pusher-type tows. The maximum overall length and extreme breadth of this type of tow which may transit the canal are as described in rules governing traffic through the waterway issued by the District Engineer.
(2) All other types of tows. All ships or tugs engaged in towing vessels not equipped with a rudder, whether light or loaded, shall use two towlines or a bridle on one towline. If the vessel in tow is equipped with a rudder, one towline without a bridle may be used. All towlines must be hauled as short as practicable for safe handling of the tows. No towboat will be permitted to enter the waterway with more than two loaded, or three light barges. Two or more barges or other vessels, not self-propelled, shall be towed abreast and not in tandem, using two towlines unless the towboat is made fast alongside the tow.
(i) [Reserved]
(j) Traffic lights. Traffic lights are located at Reedy Point and Old Town Point Wharf. These traffic lights are described in the rules governing traffic through the waterway issued by the District Engineer.
(k) Drawbridges. Operation of the Penn Central vertical lift bridge across the canal will be in accordance with regulations promulgated by the U.S. Coast Guard, § 117.235a Chesapeake and Delaware Canal, Del., of this chapter.
(l) [Reserved]
(m) Refuse and oil. The depositing of trash, refuse, debris, oil, or other material in the waterway or upon the banks or right-of-way is prohibited. Violators are subject to penalties as prescribed by Federal law.
(n) Damage to waterway property. Damage to the waterway, lands, banks, bridges, jetties, piers, fences, buildings, trees, telephone lines, lighting structures, or any other property of the United States pertaining to the waterway is prohibited.
(o) Fish and game. The fish and game laws of the United States and of the States of Delaware and Maryland, within their respective bounds, will be enforced upon the waters and lands pertaining to the waterway owned by the United States.
(p) Grounded, wrecked, or damaged vessels. In the event a vessel is grounded or wrecked in the waterway or is damaged by accident or successive mechanical breakdown, the owner, agent, or operator shall take prompt action to prevent the vessel from becoming or remaining an obstruction to navigation, and such persons shall also respond to such instructions as may be issued by the District Engineer to prevent the vessel from becoming or remaining a menace to navigation. The lack of reasonable response from owner, agent, or operator may be deemed sufficient cause for the District Engineer to undertake repair or removal of the vessel as he may determine to be in the best interest to the Government.
(q)-(s) [Reserved]
(t) Pilotage. Any pilot who pilots in the canal shall comply with State laws or Coast Guard regulations and must be licensed for this waterway by the U.S. Coast Guard.
(u) Vessels difficult to handle. Vessels which are observed by the pilot or master in charge, to be difficult to handle, or which are known to have handled badly on previous trips, must transit the canal during daylight hours and must have tug assistance. Such vessels must obtain permission from the dispatcher to enter the canal and must be provided with the number of tugs sufficient to afford safe passage. Agents must make their own arrangements for tug assistance. Such eastbound vessels must clear Reedy Point Bridge, and such westbound vessels the Chesapeake City Bridge, before dark.
[37 FR 9670, May 16, 1972, as amended at 42 FR 57961, Nov. 7, 1977; 56 FR 13765, Apr. 4, 1991]
§ 207.160 All waterways tributary to the Atlantic Ocean south of Chesapeake Bay and all waterways tributary to the Gulf of Mexico east and south of St. Marks, Fla.; use, administration, and navigation.
(a) Description. This section applies to the following:
(1) Waterways. All navigable waters of the United States, natural or artificial, including bays, lakes, sounds, rivers, creeks, intracoastal waterways, as well as canals and channels of all types, which are tributary to or connected by other waterways with the Atlantic Ocean south of Chesapeake Bay or with the Gulf of Mexico east and south of St. Marks, Florida.
(2) Locks. All Government owned or operated locks and hurricane gate chambers and appurtenant structures in any of the waterways described in paragraph (a)(1) of this section.
(3) U.S. property. All river and harbor lands owned by the United States in or along the waterways described in paragraph (a)(1) of this section, including lock sites and all structures thereon, other sites for Government structures and for the accommodation and use of employees of the United States, and rights of way and spoil disposal areas to the extent of Federal interest therein.
(4) Vessels and rafts. The term “vessel” as used in this section includes all floating things moved over these waterways other than rafts.
(b) Authority of District Engineers. The use, administration, and navigation of these waterways, Federal locks and hurricane gate chambers shall be under the direction of the officers of the Corps of Engineers, U.S. Army, detailed in charge of the respective sections, and their authorized assistants. The cities in which the U.S. District Engineers are located are as follows:
U.S. District Engineer, Norfolk, Virginia.
U.S. District Engineer, Wilmington, North Carolina.
U.S. District Engineer, Charleston, South Carolina.
U.S. District Engineer, Savannah, Georgia.
U.S. District Engineer, Jacksonville, Florida.
(c) [Reserved]
(d) Bridges. (For regulations governing the operation of bridges, see §§ 117.1, 117.240 and 117.245 of this title.)
(e) Locks—(1) Authority of lockmasters—(i) Locks staffed with Government personnel. The provisions of this subparagraph apply to all waterways in this Section except for the segment of the Atlantic Intracoastal Waterway identified in (e)(1)(ii). The lockmaster shall be charged with the immediate control and management of the lock, and of the area set aside as the lock area, including the lock approach channels. He/she shall see that all laws, rules and regulations for the use of the lock and lock area are duly complied with, to which end he/she is authorized to give all necessary orders and directions in accordance therewith, both to employees of the Government and to any and every person within the limits of the lock and lock area, whether navigating the lock or not. No one shall cause any movement of any vessel, boat, or other floating thing in the lock or approaches except by or under the direction of the lockmaster or his/her assistants.
(ii) Locks staffed with contract personnel. The provisions of this subparagraph apply to the segment of the Atlantic Intracoastal Waterway comprising the Albermarle and Chesapeake Canal and the Dismal Swamp Canal including Great Bridge Lock, Chesapeake, Virginia; Deep Creek Lock, Chesapeake, Virginia; and South Mills Lock, North Carolina. Contract personnel shall give all necessary orders and directions for operation of the locks. No one shall cause any movement of any vessel, boat or other floating thing in the locks or approaches except by or under the direction of the contract lock operator. All duties and responsibilities of the lockmaster set forth in this section shall be performed by the contract lock operator except that the responsibility for enforcing all laws, rules and regulations shall be vested in a government employee designated by the Norfolk District Engineer. The District Engineer will notify waterway users and the general public through appropriate notices and media concerning the location and identity of the designated government employee.
(2) Signals. Vessels desiring lockage in either direction shall give notice to the lockmaster at not more than three-quarters of a mile nor less than one-quarter of a mile from the lock, by two long and two short blasts of a whistle. When the lock is available, a green light, semaphore or flag will be displayed; when not available, a red light, semaphore or flag will be displayed. No vessels or rafts shall approach within 300 feet of any lock entrance unless signalled to do so by the lockmaster.
(3) Precedence at locks. (i) The vessel arriving first at a lock shall be first to lock through; but precedence shall be given to vessels belonging to the United States and to commercial vessels in the order named. Arrival posts or markers may be established ashore above or below the locks. Vessels arriving at or opposite such posts or markers will be considered as having arrived at the locks within the meaning of this paragraph.
(ii) The lockage of pleasure boats, house boats or like craft shall be expedited by locking them through with commercial craft (other than barges carrying petroleum products or highly hazardous materials) in order to utilize the capacity of the lock to its maximum. If, after the arrival of such craft, no separate or combined lockage can be accomplished within a reasonable time not to exceed the time required for three other lockages, then separate lockage shall be made.
(4) Entrance to and exit from locks. No vessel or raft shall enter or leave the locks before being signalled to do so. While waiting their turns, vessels or rafts must not obstruct traffic and must remain at a safe distance from the lock. They shall take position in rear of any vessels or rafts that may precede them, and there arrange the tow for locking in sections if necessary. Masters and pilots of vessels or in charge of rafts shall cause no undue delay in entering or leaving the lock, and will be held to a strict accountability that the approaches are not at any time unnecessarily obstructed by parts of a tow awaiting lockage or already passed through. They shall provide sufficient men to move through the lock promptly without damage to the structures. Vessels or tows that fail to enter the locks with reasonable promptness after being signalled to do so will lose their turn.
(5) Lockage of vessels. (i) Vessels must enter and leave the locks carefully at slow speed, must be provided with suitable lines and fenders, must always use fenders to protect the walls and gates, and when locking at night must be provided with suitable lights and use them as directed.
(ii) Vessels which do not draw at least six inches less than the depth on miter sills or breast walls, or which have projections or sharp corners liable to damage gates or walls, shall not enter a lock or approaches.
(iii) No vessel having chains or lines either hanging over the sides or ends, or dragging on the bottom, for steering or other purposes, will be permitted to pass a lock or dam.
(iv) Power vessels must accompany tows through the locks when so directed by the lockmaster.
(v) No vessel whose cargo projects beyond its sides will be admitted to lockage.
(vi) Vessels in a sinking condition shall not enter a lock or approaches.
(vii) The passing of coal from flats or barges to steamers while in locks is prohibited.
(viii) Where special regulations for safeguarding human life and property are desirable for special situations, the same may be indicated by printed signs, and in such cases such signs will have the same force as other regulations in this section.
(ix) The lockmaster may refuse to lock vessels which, in his judgment, fail to comply with this paragraph.
(6) Lockage of rafts. Rafts shall be locked through in sections as directed by the lockmaster. No raft will be locked that is not constructed in accordance with the requirements stated in paragraph (g) of this section. The party in charge of a raft desiring lockage shall register with the lockmaster immediately upon arriving at the lock and receive instructions for locking.
(7) Number of lockages. Tows or rafts locking in sections will generally be allowed only two consecutive lockages if one or more single vessels are waiting for lockage, but may be allowed more in special cases. If tows or rafts are waiting above and below a lock for lockage, sections will be locked both ways alternately whenever practicable. When there are two or more tows or rafts awaiting lockage in the same direction, no part of one shall pass the lock until the whole of the one preceding it shall have passed.
(8) Mooring. (i) Vessels and rafts when in the lock shall be moored where directed by the lockmaster by bow, stern and spring lines to the snubbing posts or hooks provided for that purpose, and lines shall not be let go until signal is given for vessel or raft to leave. Tying boats to the lock ladders is prohibited.
(ii) The mooring of vessels or rafts near the approaches to locks except while waiting for lockage, or at other places in the pools where such mooring interferes with general navigation of the waterway is prohibited.
(9) Maneuvering locks. The lock gates, valves, and accessories will be moved only under the direction of the lockmaster; but if required, all vessels and rafts using the locks must furnish ample help on the lock walls for handling lines and maneuvering the various parts of the lock under the direction of the lockmaster.
(f) [Reserved]
(g) Rafts, logging. (1) Rafts will be permitted to navigate a waterway only if properly and securely assembled. The passage of “bag” or “sack” rafts, “dog” rafts, or of loose logs over any portion of a waterway, is prohibited. Each section of a raft will be secured within itself in such a manner as to prevent the sinking of any log, and so fastened or tied with chains or wire rope that it cannot be separated or bag out so as to materially change its shape. All dogs, chains and other means used in assembling rafts shall be in good condition and of ample size and strength to accomplish their purposes.
(2) No section of a raft will be permitted to be towed over any portion of a waterway unless the logs float sufficiently high in the water to make it evident that the section will not sink en route.
(3) Frequent inspections will be made by the person in charge of each raft to insure that all fastenings remain secure, and when any one is found to have loosened, it shall be repaired at once. Should any log or section be lost from a raft, the fact must be promptly reported to the District Engineer, giving as definitely as possible the exact point at which the loss occurred. In all cases the owner of the lost log or section will take steps immediately to remove the same from the waterway.
(4) The length and width of rafts shall not exceed such maximum dimensions as may be prescribed by the District Engineer.
(5) All rafts shall carry sufficient men to enable them to be managed properly, and to keep them from being an obstruction to other craft using the waterway. To permit safe passage in a narrow channel rafts will, if necessary, stop and tie up alongside the bank. Care must be exercised both in towing and mooring rafts to avoid the possibility of damage to aids to navigation maintained by the United States or under its authorization.
(6) When rafts are left for any reason with no one in attendance, they must be securely tied at each end and at as many intermediate points as may be necessary to keep the timbers from bagging into the stream, and must be moored so as to conform to the shape of the bank. Rafts moored to the bank shall have lights at 500-foot intervals along their entire length. Rafts must not be moored at prominent projections of the bank, or at critical sections.
(7) Logs may be stored in certain tributary streams provided a clear channel at least one-half the width of the channel be left clear for navigation along the tributary. Such storage spaces must be protected by booms and, if necessary to maintain an open channel, piling should also be used. Authority for placing these booms and piling must be obtained by written permit from the District Engineer.
(8) The building, assembling, or breaking up of a raft in a waterway will be permitted only upon special authority obtained from the District Engineer, and under such conditions as he may prescribe.
(h) Dumping of refuse or oil in waterway, obstructions. Attention is invited to the provisions of sections 13 and 20 of the River and Harbor Act of March 3, 1899 (30 Stat. 1152, 1154; 33 U. S. C. 407, 415), and of sections 2, 3, and 4 of the Oil Pollution Act of June 7, 1924 (43 Stat. 604, 605; 33 U.S.C. 432-434), which prohibit the depositing of any refuse matter in these waterways or along their banks where liable to be washed into the waters; authorize the immediate removal or destruction of any sunken vessel, craft, raft, or other similar obstruction, which stops or endangers navigation; and prohibit the discharge of oil from vessels into the coastal navigable waters of the United States.
(i) Damage. Masters and owners of vessels using the waterways are responsible for any damage caused by their operations to canal revetments, lock piers and walls, bridges, hurricane gate chambers, spillways, or approaches thereto, or other Government structures, and for displacing or damaging of buoys, stakes, spars, range lights or other aids to navigation. Should any part of a revetment, lock, bridge, hurricane gate chamber, spillway or approach thereto, be damaged, they shall report the fact, and furnish a clear statement of how the damage occurred, to the nearest Government lockmaster or bridge tender, and by mail to the District Engineer, U.S. Engineer Office, in local charge of the waterway in which the damage occurred. Should any aid to navigation be damaged, they shall report that fact immediately to the Superintendent of Lighthouses at Norfolk, Virginia, if north of New River Inlet, North Carolina; to the Superintendent of Lighthouses at Charleston, South Carolina, if between New River Inlet, North Carolina, and St. Lucie Inlet, Florida; to the Superintendent of Lighthouses at Key West, Florida, if between St. Lucie Inlet and Suwanee River, Florida; and to the Superintendent of Lighthouses, New Orleans, Louisiana, if between Suwanee River and St. Marks, Florida.
(j) Trespass on property of the United States. Trespass on waterway property or injury to the banks, locks, bridges, piers, fences, trees, houses, shops or any other property of the United States pertaining to the waterway is strictly prohibited. No business, trading or landing of freight or baggage will be allowed on or over Government piers, bridges, or lock walls.
(k) Copies of regulations. Copies of the regulations in this section will be furnished free of charge upon application to the nearest District Engineer.
[Regs., Apr. 30, 1938, as amended at 8 FR 15381, Nov. 9, 1943; 25 FR 8908, Sept. 16, 1960; 26 FR 353, Jan. 18, 1961; 34 FR 4967, Mar. 7, 1969; 42 FR 57961, Nov. 7, 1977; 48 FR 6335, Feb. 11, 1983; 56 FR 13765, Apr. 4, 1991]
§ 207.169 Oklawaha River, navigation lock and dam at Moss Bluff, Fla.; use, administration, and navigation.
(a) The owner of or agency controlling the lock shall not be required to operate the navigation lock except from 7 a.m. to 7 p.m. during the period of February 15 through October 15 each year, and from 8 a.m. to 6 p.m. during the remaining months of the year. During the above hours and periods the lock shall be opened upon demand for the passage of vessels. The hours of operation are based on local time.
(b) The owner of or agency controlling the lock shall place signs of such size and description as may be designated by the District Engineer, U.S. Army Engineer District, Jacksonville, Fla., at each side of the lock indicating the nature of the regulations of this section.
[35 FR 10520, June 27, 1970, as amended at 38 FR 5468, Mar. 1, 1973]
§ 207.170 Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
(a) The level of the pool shall normally be maintained at elevation 56.5 feet above sea level: Provided, That the level of the pool may be raised to not exceeding 58.5 feet above sea level at such times as may be authorized in writing by the District Engineer, Jacksonville, Fla., and subject to such conditions as he may specify.
(b) When, in the opinion of the District Engineer, an emergency exists requiring the lowering of the pool level to an elevation less than 56.5 above sea level either to safeguard the dikes or to increase the discharge from Lake Griffin in times of high water, the discharge past the dam shall be regulated in such manner as he may direct until he shall declare the emergency passed.
[Regs., Dec. 3, 1928]
§ 207.170a Eugene J. Burrell Navigation Lock in Haines Creek near Lisbon, Fla.; use, administration, and navigation.
(a) The owner of or agency controlling the lock shall not be required to operate the navigation lock except from 7 a.m. to 12 noon, and from 1 p.m. to 7 p.m., during the period of February 15 through October 15 each year; and from 8 a.m. to 12 noon, and from 1 p.m. to 6 p.m., during the remaining months of each year. During the above hours and periods the lock shall be opened upon demand for the passage of vessels.
(b) The owner of the lock shall place signs, of such size and description as may be designated by the District Engineer, U.S. Army Engineer District, Jacksonville, Florida, at each side of this lock indicating the nature of the regulations of this section.
[24 FR 1461, Feb. 27, 1959]
§ 207.170b Apopka-Beauclair Navigation Lock in Apopka-Beauclair Canal in Lake County, Fla.; use, administration, and navigation.
(a) The owner of or agency controlling the lock shall not be required to operate the navigation lock except from 7:00 a.m. to 12:00 noon, and from 1:00 p.m. to 7:00 p.m., during the period of February 15 through October 15 each year; and from 8:00 a.m. to 12 noon, and from 1:00 p.m. to 6:00 p.m., during the remaining months of each year. During the above hours and periods the lock shall be opened upon demand for the passage of vessels.
(b) The owner of the lock shall place signs, of such size and descriptions as may be designated by the District Engineer, U.S. Army Engineer District, Jacksonville, Florida, at each side of this lock indicating the nature of the regulations.
[24 FR 5151, June 24, 1959]
§ 207.170c Kissimmee River, navigation locks between Lake Tohopekaliga and Lake Okeechobee, Fla.; use, administration, and navigation.
(a) The owner of or agency controlling the locks shall be required to open the navigation locks upon demand for passage of vessels during the following hours and periods:
Locks S-61, S-65, and S-65E
Monday through Friday | All year | 7:00 a.m. to 6:00 p.m.
Saturday and Sunday | Mar. 1 through Oct. 31 | 5:30 a.m. to 7:30 p.m.
Do | Nov. 1 through Feb. 28 | 5:30 a.m. to 6:30 p.m.
Lock S-65A
Seven days a week | All year | 8:00 a.m. to 5:00 p.m.
Locks S-65B, S-65C, and S-65D
Monday through Friday | All year | 8:00 a.m. to 5:00 p.m.
Saturday and Sunday | Mar. 1 through Oct. 31 | 5:30 a.m. to 7:30 p.m.
Do | Nov. 1 through Feb. 28 | 5:30 a.m. to 6:30 p.m.
(b) The owner of or agency controlling the locks shall place signs, of such size and description as may be designated by the District Engineer, U.S. Army Engineer District, Jacksonville, Florida, at each side of the locks indicating the nature of the regulations of this section.
[29 FR 2384, Feb. 12, 1964, as amended at 31 FR 7566, May 26, 1966; 33 FR 7626, May 23, 1968]
§ 207.170d Taylor Creek, navigation lock (S-193) across the entrance to Taylor Creek at Lake Okeechobee, Okeechobee, Fla.; use, administration, and navigation.
(a) The owner of or agency controlling the lock shall not be required to operate the navigation lock except from 5:30 a.m. to 8:00 p.m. daily. During the above hours the lock shall be opened upon demand for the passage of vessels.
(b) The owner of the lock shall place signs, of such size and description as may be designated by the District Engineer, U.S. Army Engineer District, Jacksonville, Florida at each side of this lock indicating the nature of the regulations of this section.
[Regs., July 17, 1973, 1522-01 (Taylor Creek, Fla.) DAEN-CWO-N]
(Sec. 7, 40 Stat. 266; 33 U.S.C. 1)
[38 FR 21404, Aug. 8, 1973]
§ 207.175a Carlson's Landing Dam navigation lock, Withlacoochee River, Fla.; use, administration, and navigation.
(a) The owner of or agency controlling the lock shall not be required to operate the navigation lock except from 7 a.m. to 12 noon, and from 1 p.m. to 7 p.m., during the period of February 15 through October 15 each year; and from 8 a.m. to 12 noon, and from 1 p.m. to 6 p.m., during the remaining months of each year. During the above hours and periods the lock shall be opened upon demand for the passage of vessels.
(b) The owner of or agency controlling the lock shall place signs, of such size and description as may be designated by the District Engineer, U.S. Army Engineer District, Jacksonville, Fla., at each side of the lock indicating the nature of the regulations in this section.
[30 FR 6161, May 1, 1965]
§ 207.180 All waterways tributary to the Gulf of Mexico (except the Mississippi River, its tributaries, South and Southwest Passes and the Atchafalaya River) from St. Marks, Fla., to the Rio Grande; use, administration, and navigation.
(a) The regulations in this section shall apply to:
(1) Waterways. All navigable waters of the U.S. tributary to or connected by other waterways with the Gulf of Mexico between St. Marks, Fla., and the Rio Grande, Tex. (both inclusive), and the Gulf Intracoastal Waterway; except the Mississippi River, its tributaries, South and Southwest Passes, and the Atchafalaya River above its junction with the Morgan City-Port Allen Route.
(2) Locks and floodgates. All locks, floodgates, and appurtenant structures in the waterways described in paragraph (a)(1) of this section.
(3) Bridges, wharves, and other structures. All bridges, wharves, and other structures in or over these waterways.
(4) Vessels. The term “vessels” as used in this section includes all floating craft other than rafts.
(5) Rafts. The term “raft” as used in this section includes any and all types of assemblages of floating logs or timber fastened together for support or conveyance.
(b) Authority of District Engineers. The use, administration, and navigation of the waterways and structures to which this section applies shall be under the direction of the officers of the Corps of Engineers, U.S. Army, in charge of the respective districts, and their authorized assistants. The location of these Engineer Districts, and the limits of their jurisdiction, are as follows:
(1) U.S. District Engineer, Mobile, Ala. The St. Marks River, Fla., to the Pearl River, Mississippi and Louisiana; and the Gulf Intracoastal Waterway from Apalachee Bay, Fla., to mile 36.4 east of Harvey Lock.
(2) U.S. District Engineer, Vicksburg, Miss. The Pearl River and its tributaries, Mississippi and Louisiana.
(3) U.S. District Engineer, New Orleans, La. From Pearl River, Mississippi and Louisiana, to Sabine River, Louisiana and Texas; and the Gulf Intracoastal Waterway from mile 36.4 east of Harvey Lock, to mile 266 west of Harvey Lock.
(4) U.S. District Engineer, Galveston, Tex. The Sabine River, Louisiana and Texas, to the Rio Grande, Tex.; and the Gulf Intracoastal Waterway from mile 266 west of Harvey Lock, to Brownsville, Tex.
(c) [Reserved]
(d) Locks and floodgates. (1) The term “lock” as used in this section shall include locks, floodgates, and appurtenant structures, and the area designated as the lock area including the lock approach channels.
(2) Authority of lockmasters. The term “lockmaster” as used in this section means the official in charge of operating a lock or floodgate. The lockmaster is responsible for the immediate management and control of the lock and lock area and for the enforcement of all laws, rules, and regulations for the use of the lock. He is authorized to give all necessary and appropriate orders and instructions to every person in the lock area, whether navigating the lock or not; and no one shall cause any movement of any vessel within the lock area unless instructed to do so by the lockmaster or his duly authorized assistants. The lockmaster may refuse passage through the lock to any vessel which, in his judgment, fails to comply with the regulations of this section.
(3) Sound signals. Vessels desiring passage through a lock shall notify the lockmaster by three long and distinct blasts of a horn, whistle, or calls through a megaphone, when within a reasonable distance from the lock. When the lock is ready for entrance, the lockmaster shall reply with three long blasts of a horn, whistle, or calls through a megaphone. When the lock is not ready for entrance, the lockmaster shall reply by four or more short, distinct blasts of a horn, whistle, or calls through a megaphone (danger signal). Permission to leave the lock shall be indicated by the lockmaster by one long blast.
(4) Visual signals. Signal lights and discs shall be displayed at all locks as follows:
(i) From sunset to sunrise. One green light shall indicate the lock is open to approaching navigation; one red light shall indicate the lock is closed to approaching navigation.
(ii) From sunrise to sunset. Large discs, identical in color and number to the light signals prescribed in paragraph (d)(4)(i) of this section will be displayed from a mast on or near the lock wall.
(5) Radiophone. Locks will monitor continuously VHF—Channel 14 (“Safety and Calling” Channel) and/or AM-2738 kHz for initial communication with vessels. Upon arrival at a lock, a vessel equipped with radio-phone will immediately advise the lock by radio of its arrival so that the vessel may be placed on proper turn. Information transmitted or received in these communications shall in no way affect the requirements for use of sound signals or display of visual signals, as provided in paragraphs (d) (3) and (4) of this section.
(6) Precedence at locks. The order of precedence for locking is:
(i) U.S. Government vessels, passenger vessels, commercial vessels, rafts, and pleasure craft.
(ii) The vessel arriving first at a lock will be locked through first. When vessels approach simultaneously from opposite directions, the vessel approaching at the same elevation as the water in the lock chamber will be locked through first. In order to achieve the most efficient utilization of the lock, the lockmaster is authorized to depart from the normal order of locking precedence, stated in paragraph (d)(6)(i) of this section, as in his judgment is warranted.
(iii) The lockage of pleasure boats, houseboats, or like craft may be expedited by locking them through with commercial craft (other than vessels carrying dangerous cargoes, as described in 46 CFR part 146). If, after the arrival of such craft, no combined lockage can be made within reasonable time, not to exceed three other lockages, then separate lockage shall be made.
(7) Entrance to and exits from locks. No vessel or tow shall enter or exit from a lock before being signaled to do so. While awaiting turn, vessels or tows must not obstruct navigation and must remain at a safe distance from the lock, taking position to the rear of any vessel or tows that precede them; and rearranging the tow for locking in sections, if necessary. Masters and pilots of vessels or tows shall enter or exit from a lock with reasonable promptness after receiving the proper signal. Appropriate action will be taken to insure that the lock approaches are not obstructed by sections of a tow either awaiting lockage or already locked through. Masters of vessels shall provide sufficient men to assist in the locking operation when deemed necessary by the lockmaster. Care shall be taken to insure prompt and safe passage of the vessel without damage to the structure.
(8) Lockage and passage of vessels. Vessels or tows shall enter and exit from locks under sufficient control to prevent damage to the lock, gates, guide walls, fenders, or other parts of the structure. Vessels shall be equipped with and use suitable fenders and adequate lines to protect the lock and to insure safe mooring during the locking operation. Vessels shall not meet or pass anywhere between the gate walls or fender system or in the approaches to locks.
(9) Vessels prohibited from locks. The following vessels shall not be permitted to enter locks or approach channels:
(i) Vessels in a sinking condition.
(ii) Vessels leaking or spilling cargo.
(iii) Vessels not having a draft of at least three (3) inches less than the depth over the sills or breast walls.
(iv) Vessels having projection or cargo loaded in such a manner that is liable to damage the structure.
(v) Vessels having chains, links, or drags either hanging over the sides or ends or dragging on the bottom for steering or other purposes.
(vi) Vessels containing flammable or dangerous cargo must have the hatch covers in place and securely fastened.
(10) Number of lockages. Tows locking in sections will generally be allowed only two consecutive lockages if other vessels are waiting for lockage unless otherwise decided by the lockmaster. If other tows are waiting above and below a lock, lockages will be made both ways alternately whenever practicable.
(11) Mooring in locks. (i) When in a lock, vessels and tows shall be moored where directed by the lockmaster by bow, stern, and spring lines to the snubbing posts or hooks provided for that purpose, and lines shall not be let go until the signal is given for the vessel to exit. Tying to the lock ladders is prohibited.
(ii) Mooring near the approaches to locks is prohibited except when the vessels or tows are awaiting lockage.
(12) Lock operating personnel. Vessels and tows using the locks may be required to furnish personnel to assist in locking through; however, the operation of the structure is the responsibility of the lockmaster, and personnel assisting in the lockage of the vessels and tows will follow the direction of the appropriate official on duty at the lock. No gates, valves or other accessories or controls will be operated unless under his direction.
(13) [Reserved]
(14) Lockage of rafts. Rafts shall be locked through as directed by the lockmaster. No raft will be locked that is not constructed in accordance with the requirements stated in paragraph (f) of this section. The person in charge of a raft desiring lockage shall register with the lockmaster immediately upon arriving at the lock and receive instructions for locking.
(e) Waterways. (1)-(5)(i) [Reserved]
(ii) Algiers Canal between the Mississippi River and Bayou Barataria, La., and on Harvey Canal, Gulf Intracoastal Waterway, mile 0 to mile 6 WHL, tows 74 feet in width will be allowed. Tows in excess of 55 feet wide desiring to move over Algiers Canal or Harvey Canal will obtain clearance from the lockmaster at Algiers Lock or Harvey Lock, respectively, before entering the canal. Overwidth tows will report clearing Algiers or Harvey Canal to the respective lockmaster and will rearrange tows to conform to prescribed dimensions immediately upon leaving the canal. The lockmaster will withhold permission for additional tows over 55 feet wide until all previously authorized tows moving in the opposite direction have cleared the waterway.
(iii)-(vi) [Reserved]
(vii) Vessels or tows shall not navigate through a drawbridge until the movable span is fully opened.
(6) Projections from vessels. Vessels or tows carrying a deck load which overhangs or projects over the side, or whose rigging projects over the side, so as to endanger passing vessels, wharves, or other property, shall not enter or pass through any of the narrow parts of the waterway without prior approval of the District Engineer.
(7) Meeting and passing. Passing vessels shall give the proper signals and pass in accordance with the Federal Rules of the Road. At certain intersections where strong currents may be encountered, sailing directions may be issued through navigation bulletins or signs posted on each side of the intersection.
(f) Rafts. The navigation regulations in this paragraph shall apply fully to the movement of rafts.
(1) Rafts will be permitted to navigate a waterway only if properly and securely assembled. Each raft shall be so secured as to prevent the loss or sinking of logs.
(2) All rafts shall carry sufficient men to enable them to be managed properly. It will be the responsibility of the owner to remove logs from the waterway that have broken loose from the raft.
(3) Building, assembling, or breaking up of a raft within a waterway may be permitted; however, the work must be done in an area that will not restrict the use of the waterway by other users. The work area must be cleared of loose logs so that they will not enter the waterway and become a hazard to navigation.
(g) Damage. Should any damage be done to a revetment, lock, floodgates, bridge, or other federally owned or operated structure, the master of the vessel shall report the accident to the nearest lockmaster or bridgetender as soon as possible after the accident. Damage to aids to navigation and to nonfederally owned bridges must be reported to the Commander, Eighth Coast Guard District, New Orleans, La.
(h) Marine accidents. Masters, mates, pilots, owners, or other persons using the waterways covered by this section shall report to the District Engineer at the earliest possible date any accident on the waterway which causes any vessel to become an obstruction to navigation. The information to be furnished the District Engineer shall include the name of the vessel, its location, and the name and address of the owner. The owner of a sunken vessel shall properly mark the vessel as soon as practicable after sinking.
(i) Trespass on U.S. property. (1) Trespass on or injury to waterway property of the United States is prohibited. No business, trading, or landing of freight, will be allowed on Government property without permission of the District Engineer.
(2) The District Engineer may establish policy pertaining to mooring, exchanging crews, loading and unloading supplies, and making emergency repairs in the vicinity of locks so long as navigation is not impeded thereby.
(j) Liability. The regulations of this section will not affect the liability of the owners and operators of vessels for any damage caused by their operations to the waterway or to the structures therein.
[36 FR 8866, May 14, 1971, as amended at 37 FR 26419, Dec. 12, 1972; 42 FR 57961, Nov. 7, 1977; 48 FR 6707, Feb. 15, 1983; 54 FR 6519, Feb. 13, 1989; 56 FR 13765, Apr. 4, 1991]
§ 207.185 Taylors Bayou, Tex., Beaumont Navigation District Lock; use, administration, and navigation.
(a) Between March 15 and September 15 each year, pleasure boats, houseboats, and other craft not employed for commercial purposes, will be locked through only at 6:00 and 11:45 a.m., and 6:30 p.m., except in cases of emergency; but whenever a lockage is made for a commercial boat, other craft may likewise pass through if there is room in the lock. At all other times lockages shall be made in accordance with § 207.180.
(b) The lock tender or one in charge of the lock shall be the judge as to whether the boat presenting itself for lockage is a commercial or pleasure boat.
[4 FR 1719, Apr. 29, 1939]
§ 207.187 Gulf Intracoastal Waterway, Tex.; special floodgate, lock and navigation regulations.
(a) Application. The regulations in this section shall apply to the operation of the Brazos River Floodgates and the Colorado River Locks at Mile 400.8 and Mile 441.5, respectively, west of Harvey Lock, La., on the Gulf Intracoastal Waterway, and navigation of the tributary Colorado River Channel in the vicinity of said locks.
(b) Definitions. The term current means the velocity of flow of water in the river. It is expressed in statute miles per hour. The term “head differential” means the difference measured in feet between the water level in the river and that in the waterway when the floodgates or lock gates are closed. The term “Lockmaster” means the official in charge of the floodgates or locks.
(c) Operation of floodgates and locks—(1) Unlimited passage. The floodgates and locks shall be opened for the passage of single vessels and towboats with single or multiple barges when the current in the river is less than 2 miles per hour and the head differential is less than 0.7 foot. When the head differential is less than 0.7, the Colorado River locks shall normally be operated as floodgates, using only the riverside gates of each lock.
(2) Limited passage. When the current in either river exceeds 2 miles per hour or the head differential at the Brazos River floodgates is between the limits of 0.7 foot and 1.8 feet, both inclusive, or the head differential at the Colorado River locks is 0.7 foot or greater, passage shall be afforded only for single vessels or towboats with single loaded barges or two empty barges. When two barges are rigidly assembled abreast of each other and the combined width of both together is 55 feet or less, they shall be considered as one barge. Each section of an integrated barge shall be considered as one barge, except when it is necessary to attach a rake section to a single box section to facilitate passage, the two sections shall be considered as one barge. It shall be the responsibility of the master, pilot or other person in charge of a vessel to determine whether a safe passage can be effected, give due consideration to the vessel's power and maneuverability, and prevailing current velocity, head differential, weather and visibility. If conditions are not favorable, passage shall be delayed until conditions improve and a safe crossing is assured.
(3) Gate closures. The Brazos River Floodgates shall be closed to navigation when the head differential exceeds 1.8 feet. The Colorado River Locks shall be closed to navigation when the current in the river exceeds a critical velocity as determined by the District Engineer, U.S. Army Engineer District, Galveston, Tex. The Brazos River Floodgates or the Colorado River Locks shall be closed to navigation when in the opinion of said District Engineer it is required for the protection of life and property, or it is to the advantage of the Government to permit uninterrupted emergency or maintenance operations, including dredging.
(4) Mooring facilities. Mooring facilities located on both banks of the Gulf Intracoastal Waterway on the approaches to the floodgates and locks are for the mooring of vessels when the floodgates or locks are closed to navigation or tows are limited to single barges. Vessels awaiting passage shall be moored parallel to the bank and as close to the bank as possible. Barges shall be moored fore and aft with two lines, each to a separate mooring facility. Beaching of vessels in lieu of mooring them is prohibited. The mooring facilities are numbered and vessels making fast to them shall notify the Lockmaster giving the number of each facility being used.
(5) [Reserved]
(6) Communication—(i) Radio. The floodgates and locks are equipped with short wave radio equipment transmitting and receiving on VHF—FM Channels 12, 13, 14 and 16. Call letters for the floodgates are WUI 411 and for the locks are WUI 412.
(ii) Telephone. The floodgates and locks are equipped with telephone facilities. The floodgates may be reached by phoning Freeport, Tx, 713-233-1251; the locks may be reached by phoning Matagorda, Tx, 713-863-7842.
(7) Arrival posts. Arrival posts 10 feet high and 10 inches in diameter have been established on the approaches to the locks and floodgates. They are painted with alternate horizontal bands of red and white 3 inches wide. Arrival at the floodgates or locks shall be determined as provided in paragraph (d)(4) of § 207.180.
(d) Navigation of the Colorado River Channel—(1) Traffic signals. (i) Light and sound signals directed both upstream and downstream on the Colorado River are mounted on top of a galvanized skeleton steel tower 85 feet high located on the northeast point of land at the Gulf Intracoastal Waterway crossing of the river. They will be operated from the control house of the East Lock of the Colorado River Locks to direct the interchange of traffic in the Colorado River and the Gulf Intracoastal Waterway.
(ii) Vessels navigating the Colorado River and desiring passage either upstream or downstream through the crossing, or into the crossing and through a lock into the Gulf Intracoastal Waterway, shall give notice to the Lockmaster by two long and distinct blasts of a whistle or horn when within a distance of not more than one-half mile nor less than one-fourth mile from the Gulf Intracoastal Waterway crossing. When the locks and the crossing are clear of vessels, the Lockmaster shall reply by two long and distinct blasts of a whistle or horn and display a green light from the signal tower indicating that the vessel in the river may proceed across the crossing or into the main stem of the Gulf Intracoastal Waterway either eastbound or westbound. When there are vessels in the river crossing or in the locks, the Lockmaster shall reply by four or more short blasts of a whistle or horn (danger signal) and display a red light from the signal tower indicating the vessel in the river shall wait at least a quarter of a mile from the crossing for clearance. When the locks and crossing are clear of vessels, the lockmaster shall indicate to the waiting vessel by two long and distinct blasts of a whistle or horn and display of a green light from the signal tower indicating that the vessel may proceed across the crossing or into the main stem of the Gulf Intracoastal Waterway either eastbound or westbound. During periods when the red light may be obscured by fog, mist, or rain, an audible signal consisting of a long blast followed by a short blast of a whistle or horn, repeated every 30 seconds, shall be sounded from the signal tower as an adjunct to the red light.
(2) Signs. Large signs with silver reflective background and stop sign red letters are erected one-fourth mile upstream and downstream from the Gulf Intracoastal Waterway on the Colorado River. The legend states “DO NOT PROCEED BEYOND THIS POINT WHEN SIGNAL TOWER LIGHT IS RED.” These signs must be obeyed.
Note:
The foregoing regulations are supplementary to the regulations in § 207.180.
[31 FR 15310, Dec. 7, 1966, as amended at 34 FR 15797, Oct. 14, 1969; 48 FR 6707, Feb. 15, 1983]
§ 207.200 Mississippi River below mouth of Ohio River, including South and Southwest Passes; use, administration, and navigation.
(a) Mississippi River bank protection works provided by United States. Except in case of great emergency, no vessel or craft shall anchor over revetted banks of the river, and no floating plant other than launches and similar small craft shall land against banks protected by revetment except at regular commercial landings. In all cases, every precaution to avoid damage to the revetment works shall be exercised. The construction of log rafts along mattressed or paved banks or the tying up and landing of log rafts against such banks shall be performed in such a manner as to cause no damage to the mattress work or bank paving. Generally, mattress work extends out into the river 600 feet from the low water line. Information as to the location of revetted areas may be obtained from, and will be published from time to time by, the District Engineers, Corps of Engineers, New Orleans, Louisiana, Vicksburg, Mississippi, and Memphis, Tennessee, and the President, Mississippi River Commission, Vicksburg, Mississippi.
(b) Mississippi River below Baton Rouge, La., including South and Southwest Passes—(1) Supervision. The use, administration, and navigation of the waterways to which this paragraph applies shall be under the supervision of the District Engineer, Corps of Engineers, New Orleans, Louisiana.
(2)-(3) [Reserved]
(4) Cable and pipeline crossings. Any cable or pipeline crossing or extending into the waterways shall be marked by large signs with 12-inch black letters on a white background readable from the waterway side, placed on each side of the river near the point where the cable or pipeline enters the water, and at a sufficient height to be readable above any obstructions normally to be expected at the locality such as weeds or moored vessels.
(5) Marine accidents. Masters, mates, pilots, owners, or other persons using the waterway to which this paragraph applies shall notify the District Engineer by the most expeditious means available of all marine accidents, such as fire, collision, sinking, or stranding, where there is possible obstruction of the channel or interference with navigation or where damage to Government property is involved, furnishing a clear statement as to the name, address, and ownership of the vessel or vessels involved, the time and place, and the action taken. In all cases, the owner of the sunken vessel shall take immediate steps properly to mark the wreck.
[15 FR 3325, May 30, 1950, as amended at 17 FR 6594, July 18, 1952; 27 FR 3166, Apr. 3, 1962; 33 FR 10456, July 23, 1968; 42 FR 51773, Sept. 29, 1977; 42 FR 57961, 57962, Nov. 7, 1977]
§ 207.249 Ouachita and Black Rivers, Ark. and La., Mile 0.0 to Mile 338.0 (Camden, Ark.) above the mouth of the Black River; the Red River, La., Mile 6.7 (Junction of Red, Atchafalaya and Old Rivers) to Mile 276.0 (Shreveport, La.); use, administration, and navigation.
(a) [Reserved]
(b) Locks—(1) Authority of lockmasters. (i) Locks staffed with Government personnel. The lockmaster shall be charged with the immediate control and management of the lock and of the area set aside as the lock area, including the lock approach channels. He shall insure that all laws, rules, and regulations for the use of the lock and lock area are duly complied with, to which end he is authorized to give all necessary orders and directions in accordance therewith both to employees of the Government and to any and every person within the limits of the lock or lock area, whether navigating the lock or not. No one shall cause any movement of any vessel or other floating thing in the lock or approaches except by or under the direction of the lockmaster or his assistants. For the purpose of the regulations in this section, the “lock area” is considered to extend from the downstream to the upstream arrival posts.
(ii) Locks staffed with contract personnel. Contract lock operators shall give all necessary orders and direction for operation of the locks. No one shall cause any movement of any vessel or other floating object in the locks or approaches except by or under the direction of the contract lock operator. All duties and responsibilities of the lockmasters set forth in this section shall be performed by the contract lock operator except that the responsibility for enforcing all laws, rules and regulations shall be vested in an offsite government employee designated by the Vicksburg District Engineer.
(2) Sound signals. (i) Vessels desiring passage through a lock in either direction shall give notice to the lockmaster by one long and one short distinct blast of a horn or whistle when not less than three-fourths mile from the lock. When carrying dangerous cargo, the signal will be one long and two short blasts of the horn or whistle. When the lock is ready for entrance, the lockmaster shall reply with one long blast of a horn or whistle. When the lock is not ready for entrance, the lockmaster shall reply by four or more short, distinct blasts of a horn or whistle (danger signal). Permission to leave the lock shall be indicated by the lockmaster by one short blast. A distinct blast is defined as a clearly audible blast of any length. A long blast means a blast of from 4 to 6 seconds' duration. A short blast is of about 1 second's duration.
(ii) Vessels that are not equipped with a sound signal desiring passage through a lock shall give notice to the lockmaster by one long blast of the horn located at either end of the lock wall. The horn may be activated by pulling the properly marked chain or rope hanging from the horn down to the water surface. One long blast means a blast of from 4 to 6 seconds' duration.
(3) Visual signals. Signal lights will be displayed outside each lock gate to supplement the sound signals, as follows:
(i) One green light to indicate that the lock is open to approaching navigation.
(ii) One red light to indicate that the lock is not open to approaching navigation. Vessels shall stand clear.
(iii) Navigation over the dam is possible during high water. When this condition exists, a continuous flashing red light, visible upstream and downstream, will be displayed to indicate that traffic will bypass the lock and pass over the dam on the Ouachita and Black Rivers.
(iv) A navigation pass is not provided as part of the Red River Locks and Dams. When water levels rise to within 2 feet of the top of the lock walls, operation of the locks will cease until the water level falls below this level. These stages can reasonably be expected to occur once in 10 years. No vessel, tow, or raft shall attempt to navigate over the lock or other structures at high river stages. United States Coast Guard radiotelephone broadcasts and U.S. Army Corps of Engineers navigation bulletins should be monitored for information on lock operations.
(4) Radiotelephone. Two-way radio equipment is provided at all locks. The “Safety and Calling” channel (Channel 16, frequency of 156.8 mhz), will be monitored at all times for initial communication with vessels. Information transmitted or received in these communications shall in no way affect the requirements for the use of sound signals or display of visual signals as provided in paragraphs (b)(2) and (3) of this section.
(5) Precedence at locks. (i) The vessel arriving first at a lock will be first to lock through. In the case of vessels approaching the lock simultaneously from opposite directions, the vessel approaching at the same elevation as the water in the lock chamber will be locked through first. Precedence shall be given to vessels belonging to the United States, passenger vessels, commercial vessels, rafts, and pleasure craft, in the order named. Arrival posts or markers will be established ashore above and below the locks. Vessels arriving at or opposite such posts or markers will be considered as having arrived at the lock within the meaning of this paragraph (b)(5). The lockmaster may prescribe such departure from the normal order of precedence stated above, as in his judgment, is warranted under prevailing circumstances to achieve best lock utilization.
(ii) The lockage of pleasure boats, houseboats, or like craft may be expedited by locking them through with commercial craft (other than barges carrying dangerous cargoes). If, after the arrival of such craft, no combined lockage can be accomplished within a reasonable time, not to exceed the time required for three other lockages, then separate lockages shall be made. Dangerous cargoes are described in 46 CFR part 146.
(iii) Vessels, tows, or rafts navigating on the Ouachita and Black Rivers with overall dimensions greater than 80 feet wide, 600 feet long, and 9 feet draft, or tows or rafts requiring breaking into two or more sections to pass through the lock may transit the lock at such time as the lockmaster determines that they will neither unduly delay the transit of craft of lesser dimensions, nor endanger the lock structure and appurtenances because of wind, current, or other adverse conditions. These craft are also subject to such special handling requirements as the lockmaster finds necessary at the time of transit.
(iv) The maximum dimensions on the Red River Waterway of a vessel tow attempting to pass through the lock during normal pool stages in a single passage are 80 feet wide, 705 feet long, and 9 feet draft. Tows requiring breaking into two or more sections to pass through the lock may transit the lock at such times as the lockmaster/lock operator determines that they will neither unduly delay the transit of craft of lesser dimensions, nor endanger the lock structure and appurtenances because of wind, current, or other adverse conditions. These craft are also subject to such special handling requirements as the lockmaster/lock operator finds necessary at the time of transit.
(6) Entrance to an exit from locks. No vessel or raft shall enter or leave locks before being signaled to do so. While waiting their turn, vessels or rafts must not obstruct navigation and must remain at a safe distance from locks. Before entering a lock they shall take position in the rear of any vessels or rafts that precede them, and there arrange the tow for locking in sections if necessary. Masters and pilots of vessels or persons in charge of rafts shall cause no undue delay in entering or leaving locks upon receiving the proper signal. They shall take such action as will insure that the approaches are not at any time unnecessarily obstructed by parts of a tow awaiting lockage or already passed through. They shall provide sufficient men to move through locks promptly without damage to the structures. Vessels or tows shall enter locks with reasonable promptness after being signaled to do so.
(7) Lockage and passage of vessels. (i) Vessels shall enter and leave locks under such control as to prevent any damage to the locks, gates, guide walls, guard walls, and fenders. Vessels shall be provided with suitable lines and fenders, shall always use fenders to protect the walls and gates, and when locking at night shall be provided with suitable lights and use them as directed. Fenders on vessels shall be water-soaked or otherwise fire proofed before being utilized in the lock or approaches. Vessels shall not meet or pass each other anywhere between the guide walls or fender system at the approaches to locks.
(ii) Vessels which do not have a draft of at least 2 feet less than the depth over sills, or which have projections liable to damage gates, walls, or fenders, shall not enter the approaches to or pass through locks. Information concerning depth over sills may be obtained from the lockman on duty.
(iii) Vessels having chains, lines, or drags either hanging over the sides or ends or dragging on the bottom for steering or other purposes will not be permitted to pass locks or dams.
(iv) Towing vessels shall accompany all tows or partial tows through locks.
(v) No vessel whose cargo projects beyond its sides will be admitted to lockage.
(vi) Vessels in a sinking condition shall not enter locks or approaches.
(vii) The lockmaster may refuse to lock vessels which in his judgment fail to comply with the regulations in this paragraph.
(viii) This section shall not affect the liability of the owners and operators of boats for any damage caused by their operations to locks or other structures.
(8) Number of lockages. Tows or rafts locking in sections will generally be allowed only two consecutive lockages if individual vessels are waiting for lockage, but may be allowed more in special cases. If tows or rafts are waiting above and below a lock for lockage, sections will be locked both ways alternately whenever practicable. When two or more tows or rafts are waiting lockage in the same direction, no part of one shall pass the lock until the whole of the one preceding it shall have passed.
(9) Mooring. (i) Vessels and rafts when in a lock shall be moored where directed by the lockmaster by bow, stern, and spring lines to the bitts provided for that purpose and lines shall not be let go until the signal is given for the vessel or raft to leave. Tying to the lock ladders is prohibited.
(ii) The mooring of vessels or rafts near the approaches to locks except while waiting for lockage, or at other places in the pools where such mooring interfers with general navigation, is prohibited.
(10) Operating locks. The lock gates, valves, and accessories will be moved only under the direction of the lockmaster; but, if required, all vessels and rafts using the locks shall furnish ample help on the lock walls for handling lines under the direction of the lockmaster.
(c) Trespass on U.S. property. Trespass on lock grounds or other waterway property or injury to the banks, lock entrances, locks, cribs, dams, piers, fences, trees, buildings, or any other property of the United States pertaining to the waterway is strictly prohibited. No landing of freight, passengers, or baggage will be allowed on or over Government piers, lock walls, guide or guard walls, except by permission of the lockmaster. No person except employees of the United States or persons assisting with the locking operations under the direction of the lockmaster will be allowed on the dam, lock walls, guide walls, guard walls, abutments, or appurtenant structures.
(d) Vessels to carry regulations. A copy of the regulations in this section shall be kept at all times on board each vessel regularly navigating the waterways to which the regulations in this section apply. Copies may be obtained free of charge at any of the locks or from the Vicksburg District Engineer, Vicksburg, Mississippi, upon request.
[37 FR 14778, July 25, 1972, as amended at 52 FR 18235, May 14, 1987; 52 FR 34775, Sept. 15, 1987; 56 FR 13765, Apr. 4, 1991; 63 FR 24428, May 4, 1998]
§ 207.260 Yazoo Diversion Canal, Vicksburg, Miss., from its mouth at Kleinston Landing to Fisher Street; navigation.
(a) Signals. Vessels navigating the canal will be governed by the Pilot Rules for Western Rivers (rivers emptying into the Gulf of Mexico and their tributaries) prescribed by the U.S. Coast Guard. (See part 95 of this title.) 1
1 Part 95 was removed by CGD 82-029, 47 FR 19519, May 6, 1982.
(b) Rafts. Rafts will be permitted to navigate the canal only if properly and securely assembled. Each section of a raft shall be so secured within itself as to prevent the sinking of any log, and so fastened with chains or wire rope that it cannot be separated or bag out or materially change its shape. All logs, chains, and other means used in assembling rafts shall be in good condition and of ample size and strength to accomplish their purpose. No section of a raft will be permitted to be towed unless the logs float sufficiently high in the water to make it evident that the section will not sink en route. Rafts shall not be of greater dimensions than 50 feet wide by 600 feet long, and if longer than 300 feet they shall be handled by two tugs; and in all cases they must be handled by sufficient tug power to make headway and guide the raft so as to give half the channel to passing vessels.
(c) Mooring. At stages below 20 feet on the Vicksburg Gage, no vessel or raft shall be moored along the west bank of the canal between points Latitude 32°21′16″, Longitude 90°53′05″ and Latitude 32°20′55″, Longitude 90°53′18″, which is approximately 1200 feet above and 1200 feet below the public boat launch (foot of Clay Street) at Vicksburg City Front. No vessel or raft shall be moored along the west bank of the canal at any stage from the mouth of the Yazoo Diversion Canal where it enters into the Mississippi River to Latitude 32°20′21″, Longitude 90°53′44″, which is approximately 1200 feet from the mouth of the canal. No vessel or raft shall be moored along the east bank of the canal at any stage from the mouth of the Yazoo Diversion Canal where it enters into the Mississippi River to Latitude 32°20′12″, Longitude 90°53′41″, which is approximately 750 feet from the mouth of the canal. When tied up, boats, barges, or rafts shall be moored by bow and stern lines parallel to the bank and as close in as practicable. Lines shall be secured at sufficiently close intervals to insure the vessel or raft will not be drawn away from the bank by winds, current, or other passing vessels. No vessel or raft shall be moored along the banks of the canal for a period longer than five (5) calendar days without written permission from the District Engineer, Corps of Engineers, Vicksburg District Office, 4155 E. Clay St., Vicksburg, Mississippi 39180-3435.
(d) [Reserved]
(e) Refuse in canal. No person shall roll or throw any stones, ashes, cinders, barrels, logs, log butts, sawdust, shavings, refuse, or any other material into the canal or the approach thereto, or place any such material on the bank or berm so that it is liable to be rolled, thrown, or washed into the canal.
(f) Preservation of works of improvement. Masters and pilots of all craft using the canal shall avoid damaging any revetment, dike, floodwall, or other work of improvement placed in or adjacent to the canal. They shall not disturb any gages or marks set as aids to navigation in the canal or approaches thereto.
(g) Fairway. A clear channel not less than 175 feet wide as established by the District Engineer shall be left open at all times to permit free and unobstructed navigation by all types of vessels.
[13 FR 9562, Dec. 31, 1948; 42 FR 57962, Nov. 7, 1977, as amended at 63 FR 24428, May 4, 1998]
§ 207.270 Tallahatchie River, Miss., between Batesville and the mouth; logging.
(a) The floating of “sack”, rafts, or of loose timbers, logs, or cribs is prohibited.
(b) Rafts shall be made up of logs parallel with each other, secured, and held closely together by cross sticks, chains, or cables placed across each crib and at the joints between cribs. No raft shall be over 60 feet wide or 800 feet long.
(c) In rafting nonbuoyant timber each crib must contain self-buoyant logs in such proportion of “floaters” to “sinkers” as will safely float the whole; and in assembling such cribs, extra strong connections must be used to prevent the breaking up of a crib or the detachment of individual logs.
(d) No raft shall be moved at river stages less than that corresponding to a reading of 3 4/10 feet on the U.S. Weather Bureau gage at Greenwood, Miss.
(e) A raft in transit must be accompanied by sufficient men, or by power boats of sufficient capacity to properly manage the movement of the raft and to keep it from being an obstruction to other craft navigating the river, or from forming jams at bridges.
(f) Rafts in transit must be so floated, and when not in transit be so tied to the bank, as not to interfere with the passage of boats.
(g) When rafts are left with no one in attendance they must be securely tied at each end and at as many intermediate points as will prevent them from bagging into the stream. When left at night a white light shall be exposed at each end of the raft.
(h) This section shall apply to the portion of the Tallahatchie River, Miss., between Batesville, Panola County, Miss., and the mouth.
[Regs. Feb. 18, 1918, as amended at 25 FR 8908, Sept. 16, 1960]
§ 207.275 McClellan-Kerr Arkansas River navigation system: use, administration, and navigation.
(a) Applicability of regulations. These regulations apply to all locks and appurtenant structures, wharves, and other Corps of Engineers structures in the following waterways: The White River between Mississippi River and Arkansas Post Canal, Arkansas; Arkansas Post Canal, Arkansas; Arkansas River between Dam No. 2, Arkansas, and Verdigris River, Oklahoma; Verdigris River between Arkansas River and Catoosa, Oklahoma; and reservoirs on these waterways between Mississippi River, Arkansas, and Catoosa, Oklahoma.
(b) Authority of district engineers. The use, administration, and navigation of the structures to which this section applies shall be under the direction of the officers of the Army Corps of Engineers, detailed in charge of the respective districts, and their authorized assistants. The cities in which these district engineers are located, and the limits of their jurisdictions, are as follows:
(1) District Engineer, U.S. Army Engineer District, Little Rock, Arkansas. From Mississippi River, Arkansas, to Arkansas-Oklahoma State line at Fort Smith, Arkansas.
(2) District Engineer, U.S. Army Engineer District, Tulsa, Oklahoma. From Arkansas-Oklahoma State line at Fort Smith, Arkansas, to Catoosa, Oklahoma.
(c) Authority of lockmasters. The lockmaster shall be charge with the immediate control and management of the lock and of the area set aside as the lock area. The lockmaster shall ensure that all laws, rules, and regulations for the use of the lock and lock area are duly complied with, to which end he/she is authorized to give all necessary orders and directions both to employees of the Government and to any person within the limits of the lock area, whether navigating the lock or not. No one shall cause any movement of any vessel or other floating thing in the lock area except by or under the direction of the lockmaster. Failure to comply with directions given by the lockmaster pursuant to the regulations in this section may result in refusal of lockage. For the purpose of the regulations in this section, the “lock area” is considered to be between the upstream and downstream arrival points. The district engineer may extend the limits of the lock area consistent with the safe and efficient use of the waterway.
(d) Precedence at locks. (1) Precedence shall be given to vessels owned by the United States, licensed commercial passenger vessels operating on a published schedule or regularly operating in the “for hire” trade, commercial tows, rafts, and pleasure craft, in the order named. Precedence being equal, the first vessel to arrive at a lock will normally be the first to lock through; however, the lockmaster may depart from this procedure to achieve optimum utilization of the lock or in accordance with the order of precedence stated above and in paragraphs (d)(2) and (h) of this section. Arrival points have been established ashore upstream and downstream of the locks. Vessels arriving at these markers or the mooring cells immediately upstream and downstream of the lock will be considered as having arrived at the lock within the meaning of this subparagraph.
(2) Vessels or tows, with overall dimensions greater than 105 feet wide or 595 feet long may transit the lock at such time as the lockmaster determines that they will neither unduly delay the transit of craft of lesser dimensions, nor endanger the lock structure and appurtenances because of wind, current, or other adverse conditions. These craft are also subject to such special handling requirements as the lockmaster deems necessary at the time of transit.
(e) Safety rules for vessels using navigation locks. (1) Leaking vessels may be excluded from the locks.
(2) Smoking, open flames, and activities capable of producing a flammable atmosphere such as painting will not be permitted in the lock chamber.
(3) All deckhands handling lines during locking procedures shall wear a personal flotation device.
(f) Dangerous cargo barges. The following rules are prescribed for all tows containing dangerous cargoes as defined in Title 46, Code of Federal Regulations. These rules are applicable to both loaded barges and empty barges.
(1) All hatches on barges used to transport dangerous cargoes shall be closed before the tow enters the lock area.
(2) Prior to entering the lock area, towboat pilots shall furnish the name of product, the source of shipment, the company which made the shipment, and the consignee. If a towboat is not equipped with a radio or its radio is out of service, pilots shall furnish this information to the lockmaster while the tow is in the lock chamber. The shipping papers required by title 46, Code of Federal Regulations, shall be available for review by the lockmaster. Lockage shall be refused when this information is not furnished to the lockmaster.
(3) Fenders shall be water-soaked or otherwise spark proofed.
(4) Smoking, open flames, chipping, or other spark producing activity are prohibited in the “lock area.”
(5) Simultaneous lockage of other vessels with vessels carrying dangerous cargoes or containing flammable vapors shall normally not be permitted. if significant delays are occurring at a lock, such simultaneous lockages, except with pleasure craft, may be permitted by the lockmaster, when he/she determines such action safe and appropriate, provided:
(i) The first vessel entering or the last vessel exiting shall be secured before the other enters or leaves.
(ii) All masters involved have agreed to the joint use of the lock.
(g) General locking procedures. (1) In case two or more boats or tows are to enter for the same lockage, their order of entry and exit shall be determined by the lockmaster.
(2) Tows entering a lock shall come to a complete stop at a point designated by the district engineer before proceeding to the mooring position.
(3) When entering or exiting locks, tow speeds shall not exceed 200 feet per minute (rate of slow walk) or the rate of travel whereby the tow can be stopped by checking should mechanical difficulties develop. When navigating over Norrell Dam during high water, vessels shall reduce speed to the minimum necessary to maintain steerageway. Pilots should check with the individual lockmasters concerning prevailing conditions. It is also recommended that pilots check their ability to reverse their engines prior to beginning an approach. Towboat engines shall not be turned off in the lock unless authorized by lockmaster.
(4) The sides and ends of all vessels passing through any lock shall be free from protrusions of any kind which might damage the lock structure.
(5) All vessels shall be provided with suitable fenders. When entering and exiting locks, one deckhand, or more if the lockmaster so directs, shall be stationed at the bow and stern of tows. These deckhands shall maintain their stations while tows are moving adjacent to any part of a lock. They shall protect the lock walls by the use of hand-held fenders. In all cases, two deckhands shall be stationed at the bows of tows 100 feet wide or wider when entering locks. They shall remain at their stations until the bows of such tows pass the recessed miter gates.
(6) Masters and pilots must use every precaution to prevent unnecessary delay in entering or leaving locks. Vessels failing to enter locks with reasonable promptness when signaled to do so shall lose their turn. Rearranging or switching of barges in the locks or in approaches is prohibited unless approved or directed by the lockmaster.
(7) No vessel shall enter a lock unless its draft is at least two feet less than the least depth of water over the sills. Information concerning controlling depth over sills can be obtained from the lockmaster at each lock or by inquiry at the office of the district engineer of the district in which the lock is located.
(8) Vessels awaiting their turn to lock shall be positioned so that they will not interfere with vessels leaving the lock. However, to the extent practicable under the prevailing conditions, vessels and tows shall be positioned so as to minimize approach time.
(9) Number of lockages. (i) Tows or rafts locking in sections will generally be allowed only two consecutive lockages if other vessels are waiting lockage, but may be allowed more in special cases. No part of a tow shall pass a lock until the whole of the one preceding it shall have passed. The lockmaster may prescribe a departure from the normal order of precedence to achieve the best lock utilization.
(ii) One deckhand, or more if the lockmaster so directs, shall tend the lines at the bow and stern of each section of a tow that transits a lock or moors to the river walls.
(10) Vessels shall enter and leave locks under such control as to prevent any damage to the walls and gates.
(11) Placing or discharging refuse of any description into the lock, on the lock walls, on the esplanade, or on any other government property is prohibited.
(h) Lockage of pleasure craft. In order to fully utilize the capacity of the lock, lockmasters may expedite the lockage of pleasure craft by locking them through with commercial vessels, except vessels carrying volatile cargoes or other substances likely to emit toxic, flammable, or explosive vapors. If the lockage of pleasure craft cannot be accomplished within the time required for three single lockages, a separate lockage of pleasure craft shall be made. Pleasure craft operators are advised that the locks have a pull chain located at the end of each river wall which signals the lockmaster that lockage is desired.
(i) Locking rafts and floating dredge discharge line. While awaiting lockage, rafts and tows containing floating dredge discharge line shall not obstruct the lock approaches. They shall be properly and securely assembled to assure adequate control while entering and exiting locks. The passage of loose logs through a lock is prohibited. Lockage will be refused to rafts unless the logs float sufficiently high to make it evident that the raft will not sink.
(j) Mooring—(1) At locks. (i) When in the locks, all vessels shall be moored as directed by the lockmaster. Vessels shall be moored with bow and stern lines leading in opposite directions to prevent the vessel from “running” in the lock. All vessels will have one additional line available on the head of the tow for emergency use. The pilot of a vessel shall remain at his station in the pilot house and the deckhands shall stand by the mooring lines during the entire locking procedure. When the vessel is securely moored, the pilot shall not cause movement of the propeller except in an emergency or unless directed by the lockmaster. Tying to lock ladders is strictly prohibited.
(ii) Mooring of any vessel will not be permitted at or between the arrival points without permission of the lockmaster.
(2) Outside of locks. (i) Vessels over 40 feet in length shall not land or anchor against revetted banks without written permission of the district engineer, except in case of emergency. When an emergency landing is necessary, adjacent locks shall be notified. In all cases, every precaution to avoid damage to the revetment works shall be exercised. The construction of log rafts along mattressed or paved banks or the tying up and landing of log rafts against such banks require the permission of the district engineer.
(ii) Government mooring facilities at the junction of main stem and secondary channels are to provide temporary mooring for tows awaiting transfer of barges to or from ports, docks, or fleeting areas located on the secondary channels. These facilities shall not be used for storage of barges or fleeting activities. The maximum permissible time of mooring at the facilities shall be determined by the district engineer.
(k) Locking signals. Vessels must approach the locks with caution and not enter or leave the locks until signaled to do so by the lockmaster.
(1) Signal by radio. Requests for lockage by radio will be the primary signal for vessels equipped with VHF-FM radios operating in the FCC authorized Maritime Band. District engineers will advise all known interested parties of the channels available for use in communicating with the locks. Pilots of commercial tows should contact the locks at least one-half hour before arrival in order that they may be informed of current river and traffic conditions that may affect the safe passage of their tows.
(2) Sound signals. In addition to radio communication, the following sound signals are prescribed for use during lockage. Sound signals given by vessels and locks shall be given by means of a horn. The term prolonged blast means a blast of from four to six second's duration. The term short blast means a blast of about one second's duration.
(i) Vessels desiring a single lockage shall give notice to the lockmaster by one prolonged blast of the horn followed by one short blast. If a double lockage is required, vessels shall give one prolonged blast of the horn followed by two short blasts. These signals are not required from pleasure craft not equipped with horns. Locking procedures for pleasure craft are prescribed in paragraph (h).
(ii) When the lock is ready for entrance, the lockmaster shall give one prolonged blast of the horn to signal permission to enter the lock chamber.
(iii) The lockmaster shall give permission to leave the lock chamber by one short blast of the horn.
(iv) Five or more short and rapid blasts of the lock horn will be used as a means of attracting attention, to indicate caution, or to signal danger. This signal will be used to attract the attention of the masters and crews of vessels using the lock or navigating in the lock area and to indicate that something unusual involving danger or requiring special caution is happening or is about to happen. When this signal is given by the lockmaster, the masters and crews of vessels in the vicinity shall immediately become alert to determine the reason for the signal and shall take the necessary steps to cope with the situation.
(3) Visual signals. Signal lights are displayed outside each lock gate to supplement the radio and sound signals. Vessels will be governed as follows:
(i) One flashing green light to indicate that the lock is open to approaching navigation.
(ii) One flashing red light to indicate that the lock is not open to approaching navigation. Vessels shall stand clear.
(iii) Flashing amber and green lights to indicate that one or both lock gates can not be fully recessed or other unusual conditions exist. Vessels can enter the lock with caution.
(iv) In the absence of any of the above visual signals, pilots shall signal for lockage by radio or horn and wait for the lockmaster to acknowledge their signal.
(l) Navigation lights on locks and dams. (1) The following navigation lights will be displayed at all locks except Norrell Lock and Lock No. 2 during hours of darkness and heavy fog.
(i) Three green lights visible through an arc of 360 degrees arranged in a vertical line on the end of the upstream river wall.
(ii) Two green lights visible through an arc of 360 degrees arranged in a vertical line on the end of the downstream river wall.
(iii) A single red light visible through an arc of 360 degrees on the ends of the upstream and downstream land walls.
(2) The following navigation lights will be displayed at Lock No. 2 during hours of darkness and heavy fog. They shall also be displayed at Norrell Lock during hours of darkness and heavy fog except when navigation is passing over the dam.
(i) Three green lights visible through an arc of 360 degrees arranged in a vertical line on the end of the upstream river wall.
(ii) Two green lights visible through an arc of 360 degrees arranged in a vertical line on the end of the downstream river wall.
(iii) A single red light visible through an arc of 360 degrees on the dolphin located furthest upstream in line with the land wall and on the dolphin located furthest downstream in line with the land wall.
(3) The following navigation lights will be displayed at Norrell Lock and Dam during hours of darkness and heavy fog when navigation is passing over the dam. During daylight hours a yellow and black disc will be displayed on each end (upstream and downstream) of the river wall to signal navigation over the dam.
(i) Three red lights visible through an arc of 360 degrees arranged in a vertical line on the end of the upstream river wall.
(ii) Two red lights visible through an arc of 360 degrees arranged in a vertical line on the end of the downstream river wall.
(iii) A single red light visible through an arc of 360 degrees on the dolphin located furthest upstream in line with the land wall and on the dolphin located furthest downstream in line with the land wall.
(iv) A single, flashing blue light visible through an arc of 360 degrees located on the end of the dam opposite the lock.
(m) Restricted areas at locks and dams. All waters immediately above and below each dam, as posted by the respective district engineers, are hereby designated as restricted areas. No vessel or other floating craft shall enter any such restricted area without permission of the lockmaster. The limits of the restricted areas at each dam will be determined by the responsible district engineer and marked by signs installed in conspicuous and appropriate locations.
(n) Trespass on lock and dam property. (1) Trespass on locks or dams or other United States property pertaining to the locks or dams is strictly prohibited except in those areas specifically permitted by the lockmaster. Any person committing a willful injury to any United States property or personnel will be prosecuted.
(2) No fishing will be permitted from the lock or dam structures.
(3) No one but employees of the United States shall move any lock machinery unless directed by the lockmaster. Tampering or meddling with the machinery or other parts of the lock is strictly forbidden.
(o) Repair and construction of navigation structures. To avoid damage to plant and structures connected with the construction or repair of locks and dams, vessels passing structures in the process of construction or repair shall reduce their speed and navigate with special caution while in the vicinity of such work.
(p) Reporting the navigation incidents. In furtherance of maintaining navigation safety the following rules are prescribed for all navigation interests:
(1) Any incident resulting in uncontrolled barges shall immediately be reported to the nearest lock and the appropriate U.S. Coast Guard Office. The report shall include information as to the number of loose barges, their cargo, and the time and location where they broke loose. The lockmaster shall be kept informed of the progress being made in bringing the barges under control so that he/she can initiate whatever actions may be warranted.
(2) Masters, owners, or other persons using the waterways to which the regulations in this section apply shall report to the nearest lockmaster or the district engineer by the most expeditious means available all marine accidents; such as fire, collision, sinking, or grounding, where there is possible obstruction of the channel or interference with navigation; furnishing a clear statement as to the name, address, and ownership of the vessel or vessels involved; the time and place; and the action taken. In all cases, the owner of a sunken vessel shall take immediate steps to mark the wreck properly.
(i) Sunken or sinking barges shall be reported to the nearest lock both downstream and upstream of the location in order that traffic passing those points may be advised of the hazards. The appropriate U.S. Coast Guard Office shall also be notified.
(ii) Whenever it is necessary to report an incident involving uncontrolled, sunken or sinking barges, the cargo in the barges shall be precisely identified.
(iii) The owners or masters of vessels sunk in the navigable waters of the United States shall provide the appropriate district engineer with a copy of the sunken vessel report furnished to the appropriate U.S. Coast Guard Marine Inspection Office.
(q) [Reserved]
(r) Liability for damage. This section shall not affect the liability of the owners and operators of vessels for any damage caused by their operations. Should any Government property be damaged as the result of the operation of a vessel, the master of the vessel shall report the accident to the nearest lockmaster or the appropriate district engineer.
(s) Persistent violation of regulations. If the owner or operator of any vessel persistently violates the regulations of this section or any orders given in pursuance thereof, after due notice of same, lockage may be refused by the district engineer. The lockmaster may refuse lockage if deemed necessary to protect government property in the vicinity of the lock.
(t) Vessels to carry regulations. A copy of these regulations shall be kept at all times on board each commercial vessel engaged in navigating the waterway. Copies may be obtained from any lock or district engineer's office on request. Masters of such vessels are also required to have on board current copies of the navigation charts and applicable Notices to Navigation Interest.
[51 FR 30639, Aug. 28, 1986, as amended at 56 FR 13765, Apr. 4, 1991]
§ 207.300 Ohio River, Mississippi River above Cairo, Ill., and their tributaries; use, administration, and navigation.
(a) Authority of lockmasters—(1) Locks staffed with Government personnel. The provisions of this paragraph apply to all waterways in this section except for Cordell Hull Lock located at Mile 313.5 on the Cumberland River in Tennessee. The lockmaster shall be charged with the immediate control and management of the lock, and of the area set aside as the lock area, including the lock approach channels. He/she shall see that all laws, rules, and regulations for the use of the lock and lock area are duly complied with, to which end he/she is authorized to give all necessary orders and directions in accordance therewith, both to employees of the government and to any and every person within the limits of the lock and lock area, whether navigating the lock or not. No one shall cause any movement of any vessel, boat, or other floating thing in the lock or approaches except by or under the direction of the lockmaster or his/her assistants. In the event of an emergency, the lockmaster may depart from these regulations as he deems necessary. The lockmasters shall also be charged with the control and management of federally constructed mooring facilities.
(2) Locks staffed with contract personnel. The provisions of this paragraph apply to Cordell Hull Lock located at Mile 313.5 on the Cumberland River in Tennessee. Contract personnel shall give all necessary orders and directions for operation of the lock. No one shall cause any movement of any vessel, boat or other floating thing in the locks or approaches except by or under the direction of the contract lock operator. All duties and responsibilities of the lockmaster set forth in this section shall be performed by the contract lock operator except that responsibility for enforcing all laws, rules, and regulations shall be vested in a government employee designated by the Nashville District Engineer. The district engineer will notify waterway users and the general public through appropriate notices and media concerning the location and identity of the designated government employee.
(b) Safety rules for vessels using navigation locks. The following safety rules are hereby prescribed for vessels in the locking process, including the act of approaching or departing a lock:
(1) Tows with flammable or hazardous cargo barges, loaded or empty. (i) Stripping barges or transferring cargo is prohibited.
(ii) All hatches on barges used to transport flammable or hazardous materials shall be closed and latched, except those barges carrying a gas-free certificate.
(iii) Spark-proof protective rubbing fenders (“possums”) shall be used.
(2) All vessels. (i) Leaking vessels may be excluded from locks until they have been repaired to the satisfaction of the lockmaster.
(ii) Smoking, open flames, and chipping or other spark-producing activities are prohibited on deck during the locking cycle.
(iii) Painting will not be permitted in the lock chamber during the locking cycle.
(iv) Tow speeds shall be reduced to a rate of travel such that the tow can be stopped by checking should mechanical difficulties develop. Pilots should check with the individual lockmasters concerning prevailing conditions. It is also recommended that pilots check their ability to reverse their engines prior to beginning an approach. Engines shall not be turned off in the lock until the tow has stopped and been made fast.
(v) U.S. Coast Guard regulations require all vessels to have on board life saving devices for prevention of drowning. All crew members of vessels required to carry work vests (life jackets) shall wear them during a lockage, except those persons in an area enclosed with a handrail or other device which would reasonably preclude the possibility of falling overboard. All deckhands handling lines during locking procedure shall wear a life jacket. Vessels not required by Coast Guard regulations to have work vests aboard shall have at least the prescribed life saving devices, located for ready access and use if needed. The lockmaster may refuse lockage to any vessel which fails to conform to the above.
(c) Reporting of navigation incidents. In furtherance of increased safety on waterways the following safety rules are hereby prescribed for all navigation interests:
(1) Any incident resulting in uncontrolled barges shall immediately be reported to the nearest lock. The report shall include information as to the number of loose barges, their cargo, and the time and location where they broke loose. The lockmaster or locks shall be kept informed of the progress being made in bringing the barges under control so that he can initiate whatever actions may be warranted.
(2) Whenever barges are temporarily moored at other than commercial terminals or established fleeting areas, and their breaking away could endanger a lock, the nearest lock shall be so notified, preferably the downstream lock.
(3) Sunken or sinking barges shall be reported to the nearest lock both downstream and upstream of the location in order that other traffic passing those points may be advised of the hazards.
(4) In the event of an oil spill, notify the nearest lock downstream, specifying the time and location of the incident, type of oil, amount of spill, and what recovery or controlling measures are being employed.
(5) Any other activity on the waterways that could conceivably endanger navigation or a navigation structure shall be reported to the nearest lock.
(6) Whenever it is necessary to report an incident involving uncontrolled, sunken or sinking barges, the cargo in the barges shall be accurately identified.
(d) Precedence at locks. (1) The vessel arriving first at a lock shall normally be first to lock through, but precedence shall be given to vessels belonging to the United States. Licensed commercial passenger vessels operating on a published schedule or regularly operating in the “for hire” trade shall have precedence over cargo tows and like craft. Commercial cargo tows shall have precedence over recreational craft, except as described in paragraph (f) of this section.
(2) Arrival posts or markers may be established ashore above and/or below the locks. Vessels arriving at or opposite such posts or markers will be considered as having arrived at the locks within the meaning of this paragraph. Precedence may be established visually or by radio communication. The lockmaster may prescribe such departure from the normal order of precedence as in his judgment is warranted to achieve best lock utilization.
(e) Unnecessary delay at locks. Masters and pilots must use every precaution to prevent unnecessary delay in entering or leaving locks. Vessels failing to enter locks with reasonable promptness when signalled to do so shall lose their turn. Rearranging or switching of barges in the locks or in approaches is prohibited unless approved or directed by the lockmaster. This is not meant to curtail “jackknifing” or set-overs where normally practiced.
(f) Lockage of recreational craft. In order to fully utilize the capacity of the lock, the lockage of recreational craft shall be expedited by locking them through with commercial craft: Provided, That both parties agree to joint use of the chamber. When recreational craft are locked simultaneously with commercial tows, the lockmaster will direct, whenever practicable, that the recreational craft enter the lock and depart while the tow is secured in the lock. Recreational craft will not be locked through with vessels carrying volatile cargoes or other substances likely to emit toxic or explosive vapors. If the lockage of recreational craft cannot be accomplished within the time required for three other lockages, a separate lockage of recreational craft shall be made. Recreational craft operators are advised that many locks have a pull chain located at each end of the lock which signals the lockmaster that lockage is desired. Furthermore, many Mississippi River locks utilize a strobe light at the lock to signal recreational type vessels that the lock is ready for entry. Such lights are used exclusively to signal recreational craft.
(g) Simultaneous lockage of tows with dangerous cargoes. Simultaneous lockage of other tows with tows carrying dangerous cargoes or containing flammable vapors normally will only be permitted when there is agreement between the lockmaster and both vessel masters that the simultaneous lockage can be executed safely. He shall make a separate decision each time such action seems safe and appropriate, provided:
(1) The first vessel or tow in and the last vessel or tow out are secured before the other enters or leaves.
(2) Any vessel or tow carrying dangerous cargoes is not leaking.
(3) All masters involved have agreed to the joint use of the lock chamber.
(h) Stations while awaiting a lockage. Vessels awaiting their turn to lock shall remain sufficiently clear of the structure to allow unobstructed departure for the vessel leaving the lock. However, to the extent practicable under the prevailing conditions, vessels and tows shall position themselves so as to minimize approach time when signaled to do so.
(i) Stations while awaiting access through navigable pass. When navigable dams are up or are in the process of being raised or lowered, vessels desiring to use the pass shall wait outside the limits of the approach points unless authorized otherwise by the lockmaster.
(j) Signals. Signals from vessels shall ordinarily be by whistle; signals from locks to vessels shall be by whistle, another sound device, or visual means. when a whistle is used, long blasts of the whistle shall not exceed 10 seconds and short blasts of the whistle shall not exceed 3 seconds. Where a lock is not provided with a sound or visual signal installation, the lockmaster will indicate by voice or by the wave of a hand when the vessel may enter or leave the lock. Vessels must approach the locks with caution and shall not enter nor leave the lock until signaled to do so by the lockmaster. The following lockage signals are prescribed:
(1) Sound signals by means of a whistle. These signals apply at either a single lock or twin locks.
(i) Vessels desiring lockage shall on approaching a lock give the following signals at a distance of not more than one mile from the lock;
(a) If a single lockage only is required: One long blast of the whistle followed by one short blast.
(b) If a double lockage is required: One long blast of the whistle followed by two short blasts.
(ii) When the lock is ready for entrance, the lock will give the following signals:
(a) One long blast of the whistle indicates permission to enter the lock chamber in the case of a single lock or to enter the landward chamber in the case of twin locks.
(b) Two long blasts of the whistle indicates permission to enter the riverward chamber in the case of twin locks.
(iii) Permission to leave the locks will be indicated by the following signals given by the lock:
(a) One short blast of the whistle indicates permission to leave the lock chamber in the case of a single lock or to leave the landward chamber in the case of twin locks.
(b) Two short blasts of the whistle indicates permission to leave the riverward chamber in the case of twin locks.
(iv) Four or more short blasts of the lock whistle delivered in rapid succession will be used as a means of attracting attention, to indicate caution, and to signal danger. This signal will be used to attract the attention of the captain and crews of vessels using or approaching the lock or navigating in its vicinity and to indicate that something unusual involving danger or requiring special caution is happening or is about to take place. When this signal is given by the lock, the captains and crews of vessels in the vicinity shall immediately become on the alert to determine the reason for the signal and shall take the necessary steps to cope with the situation.
(2) Lock signal lights. At locks where density of traffic or other local conditions make it advisable, the sound signals from the lock will be supplemented by signal lights. Flashing lights (showing a one-second flash followed by a two-second eclipse) will be located on or near each end of the land wall to control use of a single lock or of the landward lock of double locks. In addition, at double locks, interrupted flashing lights (showing a one-second flash, a one-second eclipse and a one-second flash, followed by a three-second eclipse) will be located on or near each end of the intermediate wall to control use of the riverward lock. Navigation will be governed as follows:
(i) Red light. Lock cannot be made ready immediately. Vessel shall stand clear.
(ii) Amber light. Lock is being made ready. Vessel may approach but under full control.
(iii) Green light. Lock is ready for entrance.
(iv) Green and amber. Lock is ready for entrance but gates cannot be recessed completely. Vessel may enter under full control and with extreme caution.
(3) Radio communications. VHF-FM radios, operating in the FCC authorized Maritime Band, have been installed at all operational locks (except those on the Kentucky River and Lock 3, Green River). Radio contact may be made by any vessel desiring passage. Commercial tows are especially requested to make contact at least one half hour before arrival in order that the pilot may be informed of current river and traffic conditions that may affect the safe passage of his tow.
(4) All locks monitor 156.8 MHz (Ch. 16) and 156.65 MHz (Ch. 13) and can work 156.65 MHz (Ch. 13) and 156.7 MHz (Ch. 14) Ch. 16 is the authorized call, reply and distress frequency, and locks are not permitted to work on this frequency except in an emergency involving the risk of immediate loss of life or property. Vessels may call and work Ch. 13, without switching, but are cautioned that vessel to lock traffic must not interrupt or delay Bridge to Bridge traffic which has priority at all times.
(k) Rafts. Rafts to be locked through shall be moored in such manner as not to obstruct the entrance of the lock, and if to be locked in sections, shall be brought to the lock as directed by the lockmaster. After passing the lock the sections shall be reassembled at such distance beyond the lock as not to interfere with other vessels.
(l) Entrance to and exit from locks. In case two or more boats or tows are to enter for the same lockage, their order of entry shall be determined by the lockmaster. Except as directed by the lockmaster, no boat shall pass another in the lock. In no case will boats be permitted to enter or leave the locks until directed to do so by the lockmaster. The sides of all craft passing through any lock shall be free from projections of any kind which might injure the lock walls. All vessels shall be provided with suitable fenders, and shall be used to protect the lock and guide walls until it has cleared the lock and guide walls.
(m) Mooring—(1) At locks. (i) All vessels when in the locks shall be moored as directed by the lockmaster. Vessels shall be moored with bow and stern lines leading in opposite directions to prevent the vessel from “running” in the lock. All vessels will have one additional line available on the head of the tow for emergency use. The pilothouse shall be attended by qualified personnel during the entire locking procedure. When the vessel is securely moored, the pilot shall not cause movement of the propellers except in emergency or unless directed by the lockmaster. Tying to lock ladders is strictly prohibited.
(ii) Mooring of unattended or nonpropelled vessels or small craft at the upper or lower channel approaches will not be permitted within 1200 feet of the lock.
(2) Outside of locks. (i) No vessel or other craft shall regularly or permanently moor in any reach of a navigation channel. The approximate centerline of such channels are marked as the sailing line on Corps of Engineers' navigation charts. Nor shall any floating craft, except in an emergency, moor in any narrow or hazardous section of the waterway. Furthermore, all vessels or other craft are prohibited from regularly or permanently mooring in any section of navigable waterways which are congested with commercial facilities or traffic unless it is moored at facilities approved by the Secretary of the Army or his authorized representative. The limits of the congested areas shall be marked on Corps of Engineers' navigation charts. However, the District Engineer may authorize in writing exceptions to any of the above if, in his judgment, such mooring would not adversely affect navigation and anchorage.
(ii) No vessel or other craft shall be moored to railroad tracks, to riverbanks in the vicinity of railroad tracks when such mooring threatens the safety of equipment using such tracks, to telephone poles or power poles, or to bridges or similar structures used by the public.
(iii) Except in case of great emergency, no vessel or craft shall anchor over revetted banks of the river, and no floating plant other than launches and similar small craft shall land against banks protected by revetment except at regular commercial landings. In all cases, every precaution to avoid damage to the revetment works shall be exercised. The construction of log rafts along mattressed or paved banks or the tying up and landing of log rafts against such banks shall be performed in such a manner as to cause no damage to the mattress work or bank paving. Generally, mattress work extends out into the river 600 feet from the low water line.
(iv) Any vessel utilizing a federally constructed mooring facility (e.g., cells, buoys, anchor rings) at the points designated on the current issue of the Corps' navigation charts shall advise the lockmaster at the nearest lock from that point by the most expeditious means.
(n) Draft of vessels. No vessel shall attempt to enter a lock unless its draft is at least three inches less than the least depth of water over the guard sills, or over the gate sills if there be no guard sills. Information concerning controlling depth over sills can be obtained from the lockmaster at each lock or by inquiry at the office of the district engineer of the district in which the lock is located.
(o) Handling machinery. No one but employees of the United States shall move any lock machinery except as directed by the lockmaster. Tampering or meddling with the machinery or other parts of the lock is strictly forbidden.
(p) Refuse in locks. Placing or discharging refuse of any description into the lock, on lock walls or esplanade, canal or canal bank is prohibited.
(q) Damage to locks or other work. To avoid damage to plant and structures connected with the construction or repair of locks and dams, vessels passing structures in the process of construction or repair shall reduce their speed and navigate with special caution while in the vicinity of such work. The restrictions and admonitions contained in these regulations shall not affect the liability of the owners and operators of floating craft for any damage to locks or other structures caused by the operation of such craft.
(r) Trespass of lock property. Trespass on locks or dams or other U.S. property pertaining to the locks or dams is strictly prohibited except in those areas specifically permitted. Parties committing any injury to the locks or dams or to any part thereof will be responsible therefor. Any person committing a willful injury to any U.S. property will be prosecuted. No fishing will be permitted from lock walls, guide walls, or guard walls of any lock or from any dam, except in areas designated and posted by the responsible District Engineer as fishing areas. Personnel from commercial and recreational craft will be allowed on the lock structure for legitimate business reasons; e.g., crew changes, emergency phone calls, etc.
(s) Restricted areas at locks and dams. All waters immediately above and below each dam, as posted by the respective District Engineers, are hereby designated as restricted areas. No vessel or other floating craft shall enter any such restricted area at any time. The limits of the restricted areas at each dam will be determined by the responsible District Engineer and market by signs and/or flashing red lights installed in conspicuous and appropriate places.
(t) [Reserved]
(u) Operations during high water and floods in designated vulnerable areas. Vessels operating on these waters during periods when river stages exceed the level of “ordinary high water,” as designated on Corps of Engineers' navigation charts, shall exercise reasonable care to minimize the effects of their bow waves and propeller washes on river banks; submerged or partially submerged structures or habitations; terrestrial growth such as trees and bushes; and man-made amenities that may be present. Vessels shall operate carefully when passing close to levees and other flood protection works, and shall observe minimum distances from banks which may be prescribed from time to time in Notices to Navigation Interests. Pilots should exercise particular care not to direct propeller wash at river banks, levees, revetments, structures or other appurtenances subject to damage from wave action.
(v) Navigation lights for use at all locks and dams except on the Kentucky River and Lock 3, Green River. (1) At locks at all fixed dams and at locks at all movable dams when the dams are up so that there is no navigable pass through the dam, the following navigation lights will be displayed during hours of darkness:
(i) Three green lights visible through an arc of 360° arranged in a vertical line on the upstream end of the river (guard) wall unless the intermediate wall extends farther upstream. In the latter case, the lights will be placed on the upstream end of the intermediate wall.
(ii) Two green lights visible through an arc of 360° arranged in a vertical line on the downstream end of the river (guard) wall unless the intermediate wall extends farther downstream. In the latter case, the lights will be placed on the downstream end of the intermediate wall.
(iii) A single red light, visible through an arc of 360° on each end (upstream and downstream) of the land (guide) wall.
(2) At movable dams when the dam has been lowered or partly lowered so that there is an unobstructed navigable pass through the dam, the navigation lights indicated in the following paragraphs will be displayed during hours of darkness until lock walls and weir piers are awash.
(i) Three red lights visible through an arc of 360° arranged in a vertical line on the upstream end of the river (guard) wall.
(ii) Two red lights visible through an arc of 360° arranged in a vertical line on the downstream end of the river (guard) wall.
(iii) A single red light visible through an arc of 360° on each end (upstream and downstream) of the land (guide) wall.
(3) After lock walls and weir piers are awash they will be marked as prescribed in paragraph (x) of this section.
(4) If one or more bear traps or weirs are open or partially open, and may cause a set in current conditions at the upper approach to the locks, this fact will be indicated by displaying a white circular disk 5 feet in diameter, on or near the light support on the upstream end of the land (guide) wall during the hours of daylight, and will be indicated during hours of darkness by displaying a white (amber) light vertically under and 5 feet below the red light on the upstream end of the land (guide) wall.
(5) At Locks No. 1 and 2, Green River, when the locks are not in operation because of high river stages, a single red light visible through an arc of 360° will be displayed on each end (upstream and downstream) of the lock river (guard) will at which time the lights referred to above will not be visible.
(w) Navigation lights for use at locks and dams on the Kentucky River and Lock 3, Green River. A single red light visible through an arc of 360° shall be displayed during hours of darkness at each end of the river wall or extending guard structures until these structures are awash.
(x) Buoys at movable dams. (1) Whenever the river (guard) wall of the lock and any portion of the dam are awash, and until covered by a depth of water equal to the project depth, the limits of the navigable pass through the dam will be marked by buoys located at the upstream and downstream ends of the river (guard) wall, and by a single buoy over the end or ends of the portion or portions of the dam adjacent to the navigable pass over which project depth is not available. A red nun-type buoy will be used for such structures located on the left-hand side (facing downstream) of the river and a black can-type buoy for such structures located on the right-hand side. Buoys will be lighted, if practicable.
(2) Where powerhouses or other substantial structures projecting considerably above the level of the lock wall are located on the river (guard) wall, a single red light located on top of one of these structures may be used instead of river wall buoys prescribed above until these structures are awash, after which they will be marked by a buoy of appropriate type and color (red nun or black can buoy) until covered by a depth of water equal to the project depth. Buoys will be lighted, if practicable.
(y) Vessels to carry regulations. A copy of these regulations shall be kept at all times on board each vessel regularly engaged in navigating the rivers to which these regulations apply. Copies may be obtained from any lock office or District Engineer's office on request. Masters of such vessels are encouraged to have on board copies of the current edition of appropriate navigation charts.
Notes
1. Muskingum River Lock & Dam 1 has been removed. Ohio River slackwater provides navigable channel for recreational craft to Lock 2 near Devola, Ohio. Muskingum River Locks 2 thru 11 inclusive have been transferred to the State of Ohio and are operated during the recreational boating season by the Ohio Department of Natural Resources. Inquiries regarding Muskingum River channel conditions and lock availability should be directed to the aforementioned Department.
2. Little Kanawha River Lock and Dam 1 has been removed, thus permitting recreational craft to navigate up to Lock 2 near Slate, W. Va. Operation of Locks 2 thru 5 on the Little Kanawha River has been discontinued.
3. Big Sandy River: Lock 1 has been removed, thus permitting recreational craft to navigate to Lock 2, near Buchanan, Ky. Operation of Lock 2 and Lock 3 near Fort Gay, W. Va. has been discontinued. Operation of Lock and Dam 1 on Levisa Fork near Gallup, Ky., and Lock and Dam 1 on Tug Fork near Chapman, Ky. has been discontinued.
4. Operation of the following Green River Locks has been discontinued: Lock 4 near Woodbury, Ky., Lock 5 near Glenmore, Ky., and Lock 6 near Brownsville, Ky.
5. Operation of Barren River Lock and Dam No. 1 near Richardsville, Ky. has been discontinued.
6. Operation of Rough River Lock and Dam No. 1 near Hartford, Ky. has been discontinued.
7. Operation of Osage River Lock and Dam 1 near Osage City, Mo., has been discontinued.
8. Operation of the 34 locks in the Illinois and Mississippi (Hennepin) Canal, including the feeder section, has been discontinued.
9. Operation of the Illinois and Michigan Canal has been discontinued.
[40 FR 32121, July 31, 1975, as amended at 50 FR 37580, Sept. 18, 1985; 56 FR 13765, Apr. 4, 1991]
§ 207.306 Missouri River; administration and navigation.
(a) [Reserved]
(b) General. The regulations in this section shall implement those contained in paragraph(s) of § 207.300.
[33 FR 17242, Nov. 21, 1968; 42 FR 57962, Nov. 7, 1977]
§ 207.310 Mississippi River at Keokuk, Iowa; operation of power dam by Mississippi River Power Co.
(a) All previous regulations of the Secretary of War relating to the use of the Mississippi River for the generation of power by the Mississippi River Power Co., including the memorandum of March 24, 1908, approved by the Secretary of War, March 26, 1908, are rescinded, and the following regulations will govern the operation of the dam until further orders:
(b) Excepting as specially provided in this section the normal flow of the river shall be discharged below the dam at all times of day and night.
(c) The Mississippi River Power Co. shall not during the period of navigation raise the level of its pond behind the Keokuk Dam when the natural flow of the Mississippi River is falling or when such natural flow is less than approximately 64,000 cubic feet per second, which corresponds to a normal stage of 6 feet above low water at Keokuk, Iowa, except upon the written permission of the U.S. District Engineer in charge of this locality, such permit to state the period which such ponding may cover and the maximum variation in stage below the dam which may be caused by each ponding.
(d) The granting of permits by the District Engineer shall be governed by the provision of the law authorizing the construction of the dam and its accessories, as follows:
Sec. 2. That the withdrawal of water from the Mississippi River and the discharge of water into the said river, for the purpose of operating the said power stations and appurtenant works, shall be under the direction and control of the Secretary of War, and shall at no time be such as to impede or interfere with the safe and convenient navigation of the said river by means of steamboats or other vessels or by rafts or barges. * * * (33 Stat. 713)
(e) The power company when proposing to raise or lower the pond, either under general authority or special permission, shall give due notice to the District Engineer or his authorized agent of its intention.
(f) The power company shall hold all records relating to operations affecting the river discharge open to the inspection of the District Engineer or his authorized agent.
(g) It shall be the duty of the district engineer or his authorized agent to observe closely and carefully the operations of the power company and to maintain in addition to such as may be maintained by the power company, such river and pool gages as may be advisable, and make from time to time such examinations as may be necessary for determining the effect of the operation of the power dam and accessories on the river channels.
(h) The Department of the Army approves the method of regulating the flow below the Keokuk Dam by estimating the flow 24 hours in advance and maintenance of the stage corresponding to such flow as indicated by the river gage at U.S. Lock (the method employed during 1917). The general rules stated in paragraph (g) of this section are not intended to apply to unavoidable small compensating variations in pond level behind the dam inherent in such method of regulation.
[Regs., Jan. 12, 1918]
§ 207.320 Mississippi River, Twin City Locks and Dam, St. Paul and Minneapolis, Minn.; pool level.
In accordance with the provisions of Article 8 of Federal Power Commission License of June 7, 1923 (Project No. 362-Minn., Ford Motor Co.), this section is prescribed for the control of the pool level created by the Twin City Locks and Dam, Minneapolis, in the interest of navigation, and supersedes rules and regulations made effective January 1, 1928, by the Secretary of War:
(a) The pool above the dam shall not be allowed to drop below elevation 744.5 (Cairo datum), except after loss or lowering of flashboards and before replacement or raising of same, during the navigation season; nor below elevation 743.3 during the period when the river is closed to navigation. The variation of pool level shall not exceed 0.5 foot per day whenever the pool is below elevation 745.5, and in addition, during the period when the river is closed to navigation, the maximum rate of such variation shall not exceed 0.1 foot per hour; except that during the navigation season, increases in pool level at rates greater than that specified may be made to eliminate wasting of water during an increase in river flow.
(b) Whenever, due to high flows, the pool above the dam is above elevation 746.5, all flashboards on the crest of the dam shall be removed or in the lowered position.
(c) To protect navigation in cases of emergency, such as the stranding of a boat or the loss of a pool below the Twin City Dam, etc., the licensee shall temporarily discharge water at such rates, subject to the limitations of paragraph (a) of this section, as may be directed by the U.S. District Engineer in charge of the locality.
(d) It shall be the duty of the U.S. District Engineer in charge of the locality to notify the licensee of the periods during which the river shall be considered open to navigation.
(e) It shall be the further duty of the said District Engineer or his authorized agent, by frequent inspections, to determine whether paragraphs (a) to (d) of this section are being observed. In case of noncompliance he shall so notify the licensee and report the facts to the Chief of Engineers.
[Regs., Feb. 24, 1938]
§ 207.330 Mississippi River between Winnibigoshish and Pokegama dams, Leech River between outlet of Leech Lake and Mississippi River, and Pokegama reservoir; logging.
(a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations so as to interfere as little as possible with navigation by steamboats, launches, or other craft, or with the operations of other parties using the waters for purposes similar to their own, and, so far as may be possible, shall prevent the formation of log jams.
(b) In case of the formation of a jam, the owner of the logs, poles, posts, ties, or pulpwood, causing the jam, or the representatives in charge of the drive or tow, shall cause the same to be broken with the least practicable delay.
(c) Steamboats, launches, or other craft desiring to pass through a body of floating logs, poles, or ties shall be given all reasonable and necessary assistance in doing so by the representatives in charge of the logs, poles, posts, ties, or pulpwood causing the obstruction.
(d) Any individual, firm, or corporation banking logs, poles, posts, ties, or pulpwood on the shores or within the banks of any of the waters covered by this section, which are to be transported during the navigation season, shall so place them as to maintain a clear navigable channel width of not less than 20 feet.
(e) Parties using the river for rafted poles, posts, ties, or pulpwood shall not tie rafts up to the bank two or more abreast; shall not tie up where there will be less than 50 feet of clear waterway between their raft and the other bank or between their raft and another tied to the opposite bank; and shall not tie more than three rafts along any bank without leaving an opening for a landing.
[Regs., Mar. 5, 1915]
§ 207.340 Reservoirs at headwaters of the Mississippi River; use and administration.
(a) Description. These reservoirs include Winnibigoshish, Leech Lake, Pokegama, Sandy Lake, Pine River and Gull Lake.
(b) Penalties. The River and Harbor Act approved August 11, 1888 (25 Stat. 419, 33 U.S.C. 601) includes the following provisions as to the administration of the headwater reservoirs:
And it shall be the duty of the Secretary of War to prescribe such rules and regulations in respect to the use and administration of said reservoirs as, in his judgment, the public interest and necessity may require; which rules and regulations shall be posted in some conspicuous place or places for the information of the public. And any person knowingly and willfully violating such rules and regulations shall be liable to a fine not exceeding five hundred dollars, or imprisonment not exceeding six months, the same to be enforced by prosecution in any district court of the United States within whose territorial jurisdiction such offense may have been committed.
(c) Previous regulations now revoked. In accordance with the above act, the Secretary of War prescribed regulations for the use and administration of the reservoirs at the headwaters of the Mississippi River under date of February 11, 1931, which together with all subsequent amendments are hereby revoked and the following substituted therefor.
(d) Authority of officer in charge of the reservoirs. The accumulation of water in, and discharge of water from the reservoirs, including that from one reservoir to another, shall be under the direction of the U.S. District Engineer, St. Paul, Minnesota, and of his authorized agents subject to the following restrictions and considerations:
(1) Notwithstanding any other provision of this section, the discharge from any reservoir may be varied at any time as required to permit inspection of, or repairs to, the dams, dikes or their appurtenances, or to prevent damage to lands or structures above or below the dams.
(2) During the season of navigation on the upper Mississippi River, the volume of water discharged from the reservoirs shall be so regulated by the officer in charge as to maintain as nearly as practicable, until navigation closes, a sufficient stage of water in the navigable reaches of the upper Mississippi and in those of any tributary thereto that may be navigated and on which a reservoir is located.
(e) Passage of logs and other floating bodies. Logs and other floating bodies may be sluiced or locked through the dams, but prior authority for the sluicing of logs must be obtained from the District Engineer when this operation necessitates a material change in discharge.
(f) Obstructions to flow of water. No person shall place floating bodies in a stream or pond above or below a reservoir dam when, in the opinion of the officer in charge, such act would prevent the necessary flow of water to or from such dam, or in any way injure the dam and its appurtenances, its dikes and embankments; and should floating bodies lying above or below a dam constitute at any time an obstruction or menace as beforesaid, the owners of said floating bodies will be required to remove them immediately.
(g) Trespass. No one shall trespass on any reservoir dam, dike, embankment or upon any property pertaining thereto.
[78 FR 78720, Dec. 27, 2013]
§ 207.350 St. Croix River, Wis. and Minn.
(a) Logging regulations for river above Lake St. Croix. (1) During the season of navigation from May 1 to September 30, the full natural run of water in the river shall be permitted to flow between 1 a.m. on Thursday and 4 p.m. on Sunday of each week, and during the time between 1 p.m. on Wednesday and 4 p.m. on Sunday of each week no logs shall be sluiced into the river between St. Croix Falls, Wis., and Stillwater, Minn.
(2) Except during the period above mentioned, the parties engaged in handling logs upon the river shall have the right to sluice, drive, and float loose logs and to regulate the flow of water in the river as may best suit their convenience, all reasonable caution being taken to avoid log jams.
(3) This paragraph shall remain in force until modified or rescinded. (Act of May 9, 1900, 31 Stat. 172; 33 U.S.C. 410)
(b) Power dam at Taylors Falls. (1) That between April 1 and October 31, whenever the natural river flow exceeds 1,600 feet per second, the reduced flow shall be not less than 1,600 feet per second, and that whenever the natural flow be less than 1,600 feet per second, then the reduced flow shall not be less than such natural flow: Provided, That the District Engineer in charge of the locality may vary these requirements temporarily, as the interests of navigation, in his judgment, require, prompt report of his action in such instances to be made to the Chief of Engineers.
(2) The Northern States Power Co. shall establish automatic water-stage recorders of a type approved by the district engineer at the following localities:
(i) On the Nevers Pond near the dam.
(ii) On the St. Croix hydroplant pond near the dam.
(iii) On the St. Croix hydroplant tailrace.
(iv) On the St. Croix River near Osceola.
(v) On the St. Croix River near Marine.
(3) The gages are to be installed and maintained by the Northern States Power Co. in a manner satisfactory to the District Engineer, but their operation and inspection is to be under the sole direction of the District Engineer, who will retain the original records, furnishing the Northern States Power Co. with duplicates of the gage records.
[Regs., Apr. 20, 1907, Apr. 10, 1931, as amended at 25 FR 8908, Sept. 16, 1960]
§ 207.360 Rainy River, Minn.; logging regulations for portions of river within jurisdiction of the United States.
(a) During the season of navigation, parties engaged in handling logs upon such portion of the river shall have the right to sluice, drive, and float logs in such manner as may best suit their convenience: Provided, A sufficient channel for safe navigation by boats is maintained between 7:00 a.m. and 11:00 p.m. from the opening of navigation to September 15th; between 8:00 a.m. and 11:00 p.m. from September 16th to October 31st; and between 9:00 a.m. and 11:00 p.m. from November 1st to the close of navigation.
(b) Owners of loose logs running in the river must maintain a sufficient force of men on the river to keep the logs in motion and to prevent the formation of log jams or accumulation of logs on the several rapids; and said log owners must also construct and maintain for the control and direction of floating logs, such guide booms on said rapids and at other points on said river, as may be considered necessary by the District Engineer in charge of the District.
(c) Owners of sack and brail rafts must so handle the same as not to interfere with the general navigation of the river or with the approaches to regular boat landings.
[Regs., Nov. 6, 1935, as amended at 25 FR 8908, Sept. 16, 1960]
§ 207.370 Big Fork River, Minn.; logging.
(a) During the season of navigation, parties engaged in handling logs upon the river shall have the right to sluice, drive, and float logs in such manner as may best suit their convenience: Provided, A sufficient channel is maintained at all times for the navigation of steamboats, flatboats, and other small craft.
(b) A sufficient force of men must accompany each log drive to prevent the formation of log jams and to maintain an open channel for navigation.
(c) This section shall remain in force until modified or rescinded.
[Regs., Feb. 24, 1905]
§ 207.380 Red Lake River, Minn.; logging regulations for portion of river above Thief River Falls.
(a) Parties wishing to run logs on Red Lake River must provide storage booms near the head of the river to take care of said logs.
(b) No one will be permitted to turn into the river at any time more logs than he can receive at his storage boom.
(c) Tows arriving at the head of the river shall turn their logs into the river successively in the order of their arrival, and such logs shall be at once driven to the owner's storage boom.
(d) Parties authorized to run logs on the river shall have the use of the river on successive days in rotation to run their logs from their storage boom down, but not more than 1,000,000 feet, board measure, shall be released from the storage booms on any one day. Said parties must provide a sufficient force of log drivers to keep their logs in motion throughout the section of river above mentioned, so as to avoid obstructing the general navigation of the river.
(e) When a drive is made it shall be so conducted that not more than 1,500,000 feet, board measure, of logs shall pass any point on the river in 24 hours. The decision of the agent appointed by the United States shall be final as to the quantity of logs running at any time.
(f) This section shall remain in force until modified or rescinded.
[Regs., Feb. 24, 1905]
§ 207.390 [Reserved]
§ 207.420 Chicago River, Ill.; Sanitary District controlling works, and the use, administration, and navigation of the lock at the mouth of river, Chicago Harbor.
(a) Controlling works. The controlling works shall be so operated that the water level in the Chicago River will be maintained at a level lower than that of the lake, except in times of excessive storm run-off into the river or when the level of the lake is below minus 2 feet, Chicago City Datum.
(1) The elevation to be maintained in the Chicago River at the west end of the lock will be determined from time to time by the U.S. District Engineer, Chicago, Illinois. It shall at no time be higher than minus 0.5 foot, Chicago City Datum, and at no time lower than minus 2.0 feet, Chicago City Datum, except as noted in the preceding paragraph.
(b) Lock—(1) Operation. The lock shall be operated by the Metropolitan Sanitary District of Chicago under the general supervision of the U.S. District Engineer, Chicago, Illinois. The lock gates shall be kept in the closed position at all times except for the passage of navigation.
(2) Description of lock.
Feet
Clear length | 600
Clear width | 80
Depth over sills | 1 24.4
1 This depth is below Chicago City Datum which is the zero of the gages mounted on the lock. The clear depth below Low Water Datum for Lake Michigan, which is the plane of reference for U. S. Lake Survey Charts, is 23.0 feet.
The east end of the northeast guide wall shall be marked by an intermittent red light, and by a traffic light showing a fixed red or fixed green light. The west end of the northwest gate block shall be marked by a traffic light showing a fixed red or fixed green light. The east end of the southeast guide wall and the west end of the southwest guide wall shall be marked by an intermittent white light.
(3) Authority of lockmasters. The lockmaster shall be charged with the immediate control and management of the lock, and of the area set aside as the lock area, including the lock approach channels. He shall see that all laws, rules and regulations for the use of the lock and lock area are duly complied with, to which end he is authorized to give all necessary orders and directions in accordance therewith, both to employees of the Government and to any and every person within the limits of the lock or lock area, whether navigating the lock or not. No one shall cause any movement of any vessel, boat, or other floating thing in the lock or approaches except by or under the direction of the lockmaster or his assistants.
(4) Signals. (i) Signals from vessels for lockage shall be by whistle, horn or by idling or standing near the ends of the lock guide walls. Signals from the lockmaster shall be by the traffic light and horn and/or by voice with or without electrical amplification. In case of emergency, the lockmaster may signal the vessel by wave of hand or lantern, and the signals thus given shall have the same weight as though given by visual or sound devices at the lock. Vessels must approach the lock with caution and shall not enter or leave the lock until signaled to do so by the lockmaster. The following lockage signals and duration of sound signals are prescribed. A long blast shall be of 4 second duration; a short blast shall be of 1 second duration.
(a) Vessel signals. Inbound vessels at a distance of not more than 4,000 feet from the lock and outbound vessels immediately after crossing under the Lake Shore Drive bridge shall signal for lockage by 2 long and 2 short blasts of a whistle or horn.
(b) Lock signals. (1) When the lock is ready for entrance, the traffic light will show green, and vessels under 500 gross tons shall come ahead under caution and enter the lock; vessels of 500 gross tons or more shall come to a stop along the guide wall, as prescribed in paragraph (b)(5) of this section. Should the traffic light be out of order or be invisible due to thick weather, vessels shall upon 1 long blast of the lock horn approach and moor to the south guide wall or continue into the lock if so directed by the lockmaster.
(2) When the lock is not ready for entrance, the traffic light will show red, and vessels shall not pass beyond the end of the south guide wall: Provided, however, That vessels may approach and moor to said wall if authorized by 1 long blast of the lock horn.
(3) Permission to leave the lock shall be indicated by 1 short blast of the lock horn.
(4) Caution or danger will be indicated by 4 or more flashes of the red traffic light or 4 or more short blasts of the lock horn delivered in rapid succession.
(ii) When in the lock, vessels shall not blow whistle signals for tugs, bridges, landings, etc., without the lockmaster's permission.
(iii) The master and chief engineer of each vessel of 500 gross tons or more shall be on duty at their respective stations when passing through the lock.
(5) Stop before entering. All vessels or tows of 500 gross tons or more shall come to a full stop at the point indicated by the sign reading “Stop” on the south guide wall and shall not proceed into the lock until so directed by the lockmaster.
(6) Maximum draft. Vessels drawing within 6 inches of the depth over the sills shall not be permitted lockage except under special permission from the lockmaster.
(7) Precedence at locks. The vessel arriving first at a lock shall be first to lock through; but precedence shall be given to vessels belonging to the United States and to commercial vessels in the order named. Arrival posts or markers may be established ashore above or below the locks. Vessels arriving at or opposite such posts or markers will be considered as having arrived at the locks within the meaning of this paragraph.
(8) Lockage of pleasure boats. The lockage of pleasure boats, house boats or like craft shall be expedited by locking them through with commercial craft (other than barges carrying petroleum products or highly hazardous materials) in order to utilize the capacity of the lock to its maximum. If, after the arrival of such craft, no separate or combined lockage can be accomplished within a reasonable time, not to exceed the time required for three other lockages, then separate lockage shall be made.
(9) Speed of approach and departure. Vessels of 500 gross tons or more when approaching the lock shall navigate at a speed not exceeding 2 miles per hour, and when leaving the lock shall navigate at a speed not exceeding 6 miles per hour. While entering or leaving the lock, the propellers of vessels of 500 gross tons or more shall be operated at slow speed so as not to undermine or injure the concrete paving on the bottom of the lock chamber. Tugs assisting vessels in lockage, and Coast Guard and fire vessels, may navigate at a higher speed when authorized by the lockmaster. Vessels of less than 500 gross tons shall operate at reasonable speed.
(10) Mooring. (i) Vessels shall be moored in the lock or along its approach walls in such manner as may be directed by the lockmaster. Tying to lock ladders, lamp standards, or railings is strictly prohibited. Commercial vessels and tows of 500 gross tons or more shall, in general, have at least one line out when entering the lock and shall be moored in the lock with two bow and two stern lines, which shall lead forward and aft at each end of the vessel or tow. When the gates are closed, commercial vessels shall not be permitted to work their wheels. Said vessels shall have at least two seamen ashore to handle the mooring lines while they are in the lock.
(ii) Mooring lines shall not be cast off until after the lock gates have been opened fully into their recesses, and the signal given to leave the lock. The lines leading aft shall be released first. The lines leading forward shall not be released until the vessel has started to move forward, so as to prevent the vessel from drifting back into the lock gates.
(11) [Reserved]
(12) Unnecessary delay at lock. Masters and pilots must use every precaution to prevent unnecessary delay in entering of leaving the lock. Vessels failing to enter lock with reasonable promptness, when signaled to do so, shall lose their turn. Vessels arriving at the lock with their tows in such shape so as to impede lockage, shall lose their turn.
(13) Depositing refuse prohibited. The depositing of ashes or refuse matter of any kind in the lock; the passing of coal from barges or flats while in the lock; and the emission of dense smoke from any vessel while passing through the lock, is forbidden.
(14) Vessels denied lockage. The lockmaster may deny the privilege of passage through the lock to any vessel with sharp or rough projecting surfaces of any kind, or overhanging rigging, or any vessel which is badly leaking or in a sinking condition.
(15) Fenders. All barges and oil tankers must be provided with suitable nonmetallic fenders so as to eliminate damage to the lock or approach walls and reduce fire hazard. Said fenders shall be used as may be directed by the lockmaster.
(16) Operating machinery. Lock employees only shall be permitted to operate the lock gates, valves, signals or other appliances. Tampering or meddling with machinery or other parts of the lock is strictly forbidden.
(17) [Reserved]
(18) Vessels to carry regulations. A copy of the regulations in this section shall be kept at all times on board each vessel regularly engaged in navigating this lock. Copies may be obtained without charge from the lockmaster.
(19) Failure to comply with regulations. Any vessel failing to comply with this section or any orders given in pursuance thereof, may in the discretion of the lockmaster be denied the privilege of passage through or other use of the lock or appurtenant structures.
[3 FR 2139, Sept. 1, 1938, as amended at 25 FR 8908, Sept. 16, 1960; 26 FR 354, Jan. 18, 1961; 44 FR 67657, Nov. 27, 1979; 56 FR 13765, Apr. 4, 1991]
§ 207.425 Calumet River, Ill.; Thomas J. O'Brien Lock and Controlling Works and the use, administration and navigation of the lock.
(a) Controlling Works. (1) The controlling works shall be so operated that the water level at the downstream end of the lock will be maintained at a level lower than that of Lake Michigan, except in times of excessive storm run-off into the Illinois Waterway, or when the lake level is below minus 2 feet, Chicago City Datum.
(2) The elevation to be maintained at the downstream end of the lock shall at no time be higher than minus 0.5 feet, Chicago City Datum, and at no time lower than minus 2.0 feet, Chicago City Datum, except as noted in paragraph (a)(1) of this section.
(b) Lock—(1) Operation. The Thomas J. O'Brien Lock and Dam is part of the Illinois Waterway which is a tributary of the Mississippi River. All rules and regulations defined in § 207.300, Ohio River, Mississippi River above Cairo, Illinois, and their tributaries; use, administration and navigation shall apply.
[40 FR 57358, Dec. 9, 1975]
§ 207.440 St. Marys Falls Canal and Locks, Mich.; use, administration, and navigation.
(a) The use, administration, and navigation of the canal and canal grounds shall be under the direction of the District Engineer, Engineer Department at Large, in charge of the locality, and his authorized agents. The term “canal” shall include all of the natural waters of the St. Marys River on the U.S. side of the International Boundary and all of the canalized waterway and the locks therein between the western or upstream limit, which is a north and south line tangent to the west end of the Northwest Pier, and the eastern or downstream limit, which is a north and south line tangent to the northeast corner of the old Fort Brady Reservation, the distance between limits being 1.9 miles. The term “canal grounds” shall include all of the United States part and other lands, piers, buildings, water level regulation works, hydroelectric power plant, and other appurtenances acquired or constructed for the channel improvement and use of the waterway.
Note:
Rules and regulations governing the movements of vessels and rafts in St. Marys River from Point Iroquois, on Lake Superior, to Point Detour, on Lake Huron, prescribed by the U.S. Coast Guard pursuant to 33 U.S.C. 475, are contained in part 92 of this title.
(b) Masters of all registered vessels approaching and desiring to use the locks shall, upon arriving at Sailors Encampment, Little Rapids Cut, and Brush Point, report the name of the vessel and its draft to the Coast Guard Lookout Stations at those points.
(c) Approach requirements. Upon approaching the canal, vessel masters shall request lock dispatch by radiotelephone to the Corps of Engineers Chief Lockmaster at St. Marys Falls Canal dispatch tower (Radio Call WUE-21). Every up bound vessel requiring lock transit shall request lock dispatch immediately before initiating the turn at Mission Point at the intersection of Course 1, Bayfield Channel, and Course 2, Little Rapids Cut. Every down bound vessel shall call when approximately one-half mile downstream from Big Point.
(d) When in the locks, vessels shall not blow whistle signals for tugs, supply vessels, or persons unless authorized to do so by the District Engineer or his authorized agents.
(e)(1) Manning requirements. On all vessels of 400 gross tons or over navigating the canal under their own power, the following ship's personnel shall be on duty. In the pilot house, on the bridge, the master. One mate and one able seaman shall be on watch and available to assist; in the engine room, the engineering watch officer. The chief engineer shall be available to assist. During transit of the locks, all vessels of 400 gross tons or over equipped with power operated mooring deck winches shall have, in addition to the winch operators, mates or signalman at the forward and after ends of the vessel to direct operations from points providing maximum vision of both the winch operators and canal linesmen.
(2) Linehandlers—(i) Cargo vessels equipped with bow thrusters and friction winches. Two line handlers from the vessel are required on the piers under normal weather conditions. Lockmasters can ask for three persons under severe weather conditions. If a vessel is experiencing mechanical problems or in extreme severe weather situations, the lockmaster may require four vessel-supplied line handlers on the pier.
(ii) Vessels with non-friction winches or lack of both bow and stern thrusters. Four vessel-supplied line handlers are required on the pier at all times.
(f) Vessel restrictions—(1) Speed limits. Within the limits of the canal, vessels approaching the locks shall not navigate at a speed greater than 2 1/2 miles per hour, and vessels leaving the locks shall not navigate at a speed greater than 6 miles per hour. Tugs assisting vessels in passing through the locks may be authorized by the District Engineer or his authorized agents to navigate at a higher speed when considered necessary to expedite canal operations.
(2) Use of bow/stern thrusters. Bow and/or stern thruster use shall be kept to a minimum while transiting the Soo Locks. Thrusters shall not be used while the thrusters are opposite lock gates. They may be used sparingly for short durations within the lock to maintain the ship position near the mooring wall or in an emergency. Thrusters shall be at zero thrust during the period the ship is stopped and moored to the wall with all lines out, and during raising and lowering of pool levels within the chamber.
(g) For passage through the canal, vessels or boats owned or operated by the U.S. Government may be given precedence over all others.
(h) Vessel lockage order—(1) Arrival. All registered vessels will be passed through the locks in the order of their arrival at the dispatch point unless otherwise directed by the District Engineer or his authorized agents. When a vessel that has stopped on its own business is ready to proceed, it is not entitled to precedence over other vessels already dispatched.
(2) Departure. The following order of departure procedure will apply to vessels leaving the MacArthur Lock and Poe Lock simultaneously or at approximately the same time:
(i) The first vessel to leave will be the vessel in the lock which is ready for vessel release first. The vessel in the other lock will be restrained by the gates remaining closed and the wire rope fender remaining in the down position.
(A) On down bound passages, the vessel retained shall not leave the lock until such time as the bow of the vessel leaving first reaches the end of the East Center pier.
(B) On up bound passages, the vessel retained shall not leave the lock until such time as the bow of the vessel leaving first reaches the railroad bridge.
(ii) When a 1,000 foot vessel is ready to depart the Poe Lock and a vessel has left the MacArthur Lock already, the 1,000 foot vessel may start to leave once the bow of the other vessel reaches the end of the respective nose pier.
(iii) Vessels will remain in radio contact with each other and with the Chief Lockmaster at all times until clear of the lock area.
(iv) The need for a deviation from the procedures set forth in paragraph (h)(2)(i) of this section will be determined on a case by case basis by the Chief Lockmaster. If two vessels masters agree to a different departure scheme, they both shall notify the Chief Lockmaster and request a change.
(i) Unless otherwise directed, all vessels or boats approaching the locks shall stop at the points indicated by signs placed on the canal piers until ordered by the District Engineer or his authorized agents to proceed into the lock.
(j) Vessels and boats shall not proceed to enter or leave a lock until the lock gates are fully in their recesses and the lockmaster has given directions for starting.
(k) Upon each passage through the canal, the master or clerk of the vessel or craft shall report to the canal office, upon the prescribed form, a statement of passengers, freight, and registered tonnage, and such other statistical information as may be required by the blank forms provided for the purpose.
(l) No business, trading, or loading or landing of freight, baggage, or passengers will be allowed on or over the canal piers or lock walls, or over the other piers within the limits of the canal grounds, except by prior authority of the District Engineer or his authorized agents.
(m) No person shall throw material of any kind into the canal, or litter the grounds with any refuse.
(n) The releasing of vessel steam, water, or waste from side discharge openings upon the piers or lock walls, the cleaning of boiler flues in the locks or canal, or the emission of dense smoke from the stack of any vessel while passing through the locks, is forbidden.
(o) No person shall enter or navigate the canal with a boat or other craft which, when entering or while navigating the canal, shall have an iron or irons projecting from it or a rough surface or surfaces on it which would be liable to damage the lock walls or canal piers.
(p) No person shall cause or permit any vessel or boat of which he is in charge or on which he is employed to in any way obstruct the canal or delay in passing through it, except upon prior authority of the District Engineer or his authorized agents.
(q) No person shall enter upon any part of the canal grounds except as permitted, either generally or in specific instances, by the District Engineer or his authorized agents. No person shall willfully or carelessly injure, tamper with, or damage the canal or any of the Government buildings, works or structures, trees or shrubbery, or other public property pertaining to the canal or canal grounds.
(r) Tug assist procedure—(1) Self-powered vessels. Mariners are advised that often times adverse local weather conditions, i.e., high winds, current conditions and/or inclement weather, exists as vessels approach, enter and/or depart the Soo Locks. These conditions combined with close quarters slow speed maneuvering, particularly with large vessels not equipped with bow or stern thrusters, may cause control difficulties for certain classes of vessels. Therefore, any vessel requesting lockage which in the opinion of the vessel master in consultation with the pilot on board, where applicable may experience severe control problems due to the above conditions, must request assistance by one or more tugs to ensure full control over the vessel at all times. Vessel masters and pilots must consult with the lockmaster concerning local conditions well in advance of arrival at the lock to allow tug assistance to be arranged if necessary. These guidelines apply to all vessels.
(2) Non self-powered vessels. All barges or other vessels navigating within the canal and not operating under their own power, whether approaching or leaving the locks, are required to be assisted by one or more tugs of sufficient power to ensure full control at all times.
(s) Smoking and open flames are prohibited on the canal grounds within 50 feet of any tanker transiting the canal and locks, and on board the tanker transiting the locks except in such places as may be designated in the ship's regulations.
(t) All oil tankers, barges, and other vessels which are used for transporting inflammable liquids, either with or without cargo, shall, if not equipped with fixed timber fenders, be prevented from contacting any unfendered pier, lock wall, or other structure by an adequate number of suitable fenders of timber, rubber, or rope placed between the vessel and such unfendered structure.
(u) The locks will be opened and closed to navigation each year as provided in paragraphs (u) (1) and (2) of this section except as may be authorized by the Division Engineer. Consideration will be given to change in these dates in an emergency involving disaster to a vessel or other extraordinary circumstances.
(1) Opening date. At least one lock will be placed in operation for the passage of vessels on March 25. Thereafter, additional locks will be placed in operation as traffic density demands.
(2) Closing date. The locks will be maintained in operation only for the passage of down bound vessels departing from a Lake Superior port before midnight (2400 hours) of January 14, and of upbound vessels passing Detour before midnight (2400 hours) of January 15. Vessel owners are requested to report in advance to the Engineer in charge at Sault Ste. Marie, the name of vessel and time of departure from a Lake Superior port on January 14 before midnight, and of vessels passing Detour on January 15 before midnight, which may necessitate the continued operation of a lock to permit passage of vessel.
(v) The maximum overall dimensions of vessels that will be permitted to transit MacArthur Lock are 730 feet in length and 75 feet in width, except as provided in paragraph (v)(1) of this section. Further, any vessel of greater length than 600 feet must be equipped with deck winches adequate to safely control the vessel in the lock under all conditions including that of power failure.
(1) Whenever the Poe Lock is out of service for a period exceeding 24 hours the District Engineer may allow vessels greater than 730 feet in length, but not exceeding 767 feet in length to navigate the MacArthur Lock. Masters of vessels exceeding 730 feet in length shall be required to adhere to special handling procedures as prescribed by the District Engineer.
(w) The maximum overall dimensions of vessels that will be permitted to transit the New Poe Lock without special restrictions are 100 feet in width, including fendering, and 1,000 feet in length, including steering poles or other projections. Vessels having overall widths of over 100 feet and not over 105 feet including fendering, and overall lengths of not more than 1,100 feet, including projections, will be permitted to transit the New Poe Lock at such times as determined by the District Engineer or his authorized representative that they will not unduly delay the transit of vessels of lesser dimensions, or endanger the lock structure because of wind, ice, or other adverse conditions. These vessels also will be subject to such special handling requirements as may be found necessary by the Area Engineer at time of transit. Vessels over 1,000 feet in length will be required to be equipped with six mooring cables and winches ready for use to assist in safe transit of the lock.
(x) Masters or other persons refusing to comply with the regulations in this section or any orders given in pursuance thereof, or using profane, indecent, or abusive language, may, in the discretion of the District Engineer or his authorized agents, be denied the privileges of the locks and canal grounds.
[10 FR 14451, Nov. 27, 1945, as amended at 21 FR 8285, Oct. 30, 1956; 22 FR 401, Jan. 19, 1957; 22 FR 864, Feb. 12, 1957; 31 FR 4346, Mar. 12, 1966; 34 FR 18458, Nov. 20, 1969; 40 FR 8347, Feb. 27, 1975; 40 FR 20818, May 13, 1975; 42 FR 6582, Feb. 3, 1977; 42 FR 12172, Mar. 3, 1977; 57 FR 10245, Mar. 24, 1992; 61 FR 55572, Oct. 28, 1996; 64 FR 69403, Dec. 13, 1999]
§ 207.441 St. Marys Falls Canal and Locks, Mich.; security.
(a) Purpose and scope of the regulations. The regulations in this section are prescribed as protective measures. They supplement the general regulations contained in § 207.440 the provisions of which shall remain in full force and effect except as modified by this section.
(b) Restrictions on transit of vessels. The following classes of vessels will not be permitted to transit the U.S. locks or enter any of the United States approach canals:
(1)-(3) [Reserved]
(4) Tanker vessels—(i) Hazardous material. Cleaning and gas freeing of tanks on all hazardous material cargo vessels (as defined in 49 CFR part 171) shall not take place in a lock or any part of the Soo Locks approach canals from the outer end of the east center pier to the outer end of the southwest pier.
(ii) Approaching. Whenever a tank vessel is approaching the Soo Locks and within the limits of the lock piers (outer ends of the southwest and east center piers) either above or below the locks, no other vessel will be released from the locks in the direction of the approaching tank vessel, unless the tank vessel is certified gas free or is carrying non-combustible products, until the tank vessel is within the lock chamber or securely moored to the approach pier. Whenever a tank vessel is within a Soo Lock Chamber, the tank vessel, unless certified gas free or is carrying non-combustible products, will not be released from the lock until the channel within the limits of the lock piers either above or below the lock, in the direction of the tank vessel, is clear of vessels or vessels therein are securely moored to the approach pier. This limits movement to a single vessel whenever a tank vessel is within the limits of the lock piers either above or below the locks, unless the tank vessel is certified gas free or is carrying non-combustible products. Tank vessels to which this paragraph (b)(4)(ii) applies include those vessels carrying fuel oil, gasoline, crude oil or other flammable liquids in bulk, including vessels that are not certified gas free where the previous cargo was one of these liquids.
(iii) Locks park. Except as provided in paragraph (b)(5) of this section, tankers with any type cargo will be permitted to transit the MacArthur Lock when the locks park is closed. The exact dates and times that the park is closed varies, but generally these periods are from midnight to 6 a.m. June through September with one or two hour closure extensions in the early and late seasons. Tankers carrying non-combustible products that will not react hazardously with water or tankers that have been purged of gas or hazardous fumes and certified gas free will be allowed to transit the MacArthur Lock when the park is open.
(5) Carrying explosives. All vessels, except U.S. vessels of war and public vessels as defined in 46 U.S.C. 2101, carrying explosives are prohibited from transiting the U.S. Locks.
(c) Personnel restrictions. Masters of vessels are responsible for the conduct of crew and passengers while transiting St. Marys Falls Canal and Locks and for strict compliance with the regulations. The following procedures are established for the control of persons embarking or debarking from vessels while transiting the locks:
(1) The master or mate and not more than three deckhands will be permitted to go ashore from transiting vessels and then only for normal operations and business incident to the transit. A maximum of four men will be permitted ashore at any one time from any one ship.
(2) Personnel—(i) Embarking. Personnel, including technicians, repairmen, and company officials will be permitted to embark at the locks if they are in possession of a letter addressed to the Area Engineer, St. Marys Falls Canal, Sault Ste. Marie, Michigan, from the vessel's master, the operators of the vessel, or the Lake Carriers' Association, requesting that the individual named therein be permitted to embark on a particular vessel. United States vessel personnel must also be in possession of a specially validated seaman's document issued by the U.S. Coast Guard. Their papers will be presented to the civilian guard on duty at the main gate on Portage Avenue who will arrange escort from the gate to the vessel. Luggage will be subject to inspection.
(ii) Debarking. The vessel master will furnish prior notification to the Chief Lockmaster at St. Marys Falls Canal Tower (Radio Call WUD-31) that he has vessel personnel, technicians, repairmen or company officials aboard for whom he requests authority to debark. If authority to debark is granted such personnel will be furnished a letter by the vessel master, addressed to the Area Engineer, St. Marys Falls Canal, Sault Ste. Marie, Michigan, giving the name and position of the individual concerned. Personnel will not debark until they have been properly identified by a licensed officer of the vessel and the letter furnished to the escort provided from the civilian guard detail who will escort personnel to the gate. In the event a person debarking for medical attention is a litter case, notification will be given sufficiently in advance to permit the Chief Lockmaster to route the vessel to the MacArthur Lock in order that the long carry over the lock gates may be avoided. The Area Engineer will make the necessary arrangements for clearance of ambulances and medical personnel into the lock area.
(3) No passengers or guest passengers will be permitted to embark or debark at St. Marys Falls Canal except in emergency when medical attention is required.
(4) Letters cited in paragraph (c)(2) of this section are valid only for a single passage through the lock area. In the event frequent access to the area is required a request for extended access with reasons therefor will be submitted to the Area Engineer, St. Marys Falls Canal, Sault Ste. Marie, Michigan, who may arrange for the necessary clearance.
(5) Emergency needs to embark or debark which develop with insufficient time to follow the procedure outlined in this paragraph will be approved or disapproved by the Area Engineer, St. Marys Falls Canal, Sault Ste. Marie, Michigan, according to the circumstances of the individual case, and requests therefor should be promptly directed to him.
[19 FR 1275, Mar. 6, 1954, as amended at 21 FR 10253, Dec. 20, 1956; 23 FR 2300, Apr. 9, 1958; 24 FR 4562, June 4, 1959; 32 FR 10652, July 20, 1967; 35 FR 7512, May 14, 1970; 37 FR 4194, Feb. 2, 1972; 41 FR 3291, Jan. 22, 1976; 66 FR 30063, June 5, 2001; 66 FR 31277, June 11, 2001]
§ 207.460 Fox River, Wis.
(a) Use, administration and navigation of the locks and canals—(1) Navigation. The Fox River and Wolf River navigation seasons will commence and close as determined by the district engineer, Corps of Engineers, in charge of the locality, depending on conditions and need for lock service. Days and hours of lock operation will also be determined by the district engineer. Public notices will be issued announcing or revising the opening and closing dates and operating schedules at least 10 days in advance of such dates.
(2) Authority of lockmaster. The movement of all boats, vessels, tows, rafts and floating things, both powered and nonpowered, in the canals and locks, approaches to the canals, and at or near the dams, shall be subject to the direction of the lockmaster or his duly authorized representatives in charge at the locks.
(3) Signals. All boats approaching the locks shall signal for lockage by four distinct whistles of short duration. Locks will not be opened on such audible signal during the period when advance notice is required if the services of the lock tender are required elsewhere to meet prior requests for lockages.
(4) Mooring in locks. All craft being locked shall be secured to the mooring posts on the lock walls. Large craft shall use one head line and at least one spring line. Lines shall remain fastened until the signal is given by the lock tender for the craft to leave the lock.
(5) Delays in canals. No boat, barge, raft or other floating craft shall tie up or in any way obstruct the canals or approaches, or delay entering or leaving the locks, except by permission from proper authority. Boats wishing to tie up for some hours or days in the canals must notify the Project Engineer directly or through a lock tender, and proper orders on the case will be given. Boats so using the canals must be securely moored in the places assigned, and if not removed promptly on due notice, will be removed, as directed by the Project Engineer at the owner's expense. Boats desiring to tie up in the canals for the purpose of unloading cargoes over the canal banks must, in each case, obtain permission in advance from the District Engineer. Request for such permission shall be submitted through the Project Engineer.
(6) Provisions for lockage service. (i) Commercial vessels, barges, rafts and tows engaged in commerce will be provided lockages during the same period as provided for pleasure boats (see paragraph (a)(6)(iv) of this section).
(ii) Pleasure boats, powered and non-powered, houseboats and similar craft will be provided with not more than one lockage each way through the same lock in a 24-hour period.
(iii) All small vessels or craft, such as skiffs, sculls, sailing boats, etc., shall be passed through locks in groups of not less than six at one lockage, or may be granted separate lockage if the traffic load at the time permits.
(iv) Lockage may be provided during certain hours other than announced at the intermediate locks provided prior requests are made to the Corps of Engineers, Fox River Project Office. Requests may be made either in writing, by telephone or in person to U.S. Army Corps of Engineers, Fox River Project Office, 1008 Augustine Street, Kaukauna, Wisconsin 54130, telephone: 414-766-3531.
(7) Injury to locks or fixtures. Vessel operators shall use great care not to strike any part of the locks or sluice walls, or any gate or appurtenance thereto, or machinery for operating the gates, or the walls protecting the banks of the canals. All boats using the canals shall be free from projecting irons or rough surfaces that would be liable to damage the locks or any part of the canals, and they must be provided with fenders to be used in guarding the lock walls, etc., from injury. Boats will not be permitted to enter or leave the locks until the lock gates are fully in the gate recesses, and the lock tender has directed the boat to proceed. No vessel shall be raced or crowded alongside another vessel, or be moved at such speed as will cause excessive swells or wash. Speed shall be kept at a minimum consistent with safe navigation.
(8) Handling gates. No one, unless authorized by the lock tender, shall open or close any gate, or valve, or in any way interfere with the employees in the discharge of their duties. The lock tender may call for assistance from the master of any boat using the lock should such aid be needed.
(9) Draft of boats. No boat shall enter a canal or lock whose actual draft exceeds the least depth of water in the channel of the canal as given by the Project Engineer.
(10) Right-of-way. Boats going downstream shall have the right-of-way over boats going upstream. Ordinarily, the boats or tows arriving first at any of the locks shall have precedence in passage except that those vessels which have given advance notice, when such notice is required, shall have precedence over other vessels when such notifying vessel is ready for passage. In all cases boats and barges belonging to the United States, or employed upon public works, shall have precedence over all others, and commercial passenger boats shall have precedence over tows. All boats not taking advantage of the first lawful opportunity to pass shall lose their turn. When lockage has started on tows requiring multiple lockages, all units of the tow will be locked ahead of other vessels traveling in the same direction. In the case of tows requiring two lockages, any craft awaiting lockage in the opposite direction will have priority over the second lockage of the tow.
(11) Boats and rafts without power. No boat or raft without power except small boats controlled by sails or oars shall be brought through the canal unless accompanied by a power operated boat.
(12) Dumping of refuse in waterway. No refuse or other material shall be thrown or dumped from vessels into the natural river, improved channels, canals and locks or placed on any bank of the river or berm of the canals so that it is liable to be thrown or washed into the waterway. (Sec. 13 of the River and Harbor Act of Mar. 3, 1899 (30 Stat. 1152; 33 U.S.C. 407), prohibits the depositing of any refuse matter in any navigable water or along the banks thereof where the same shall be liable to be washed into such navigable water.)
(13) Drawing off water. No water shall be drawn by any party or parties from any portion of the Fox River canals, or of the Fox River, including its lakes, improved channels and unimproved channels, to such extent as to lower the water surface below the crest of that dam next below the place where such draft of water is affected.
(14) Obstructing navigation. Anyone who shall willfully or through carelessness in any way obstruct the free navigation of the waterway, or by violation of any of the laws or regulations governing the waterway and those using it, delay or inconvenience any boat having the right to use the waterway, shall be responsible for all damages and delays, and for all expenses for removing the obstructions. (Sec. 20 of the River and Harbor Act of Mar. 3, 1899 (30 Stat. 1154; 33 U.S.C. 415), authorizes the immediate removal or destruction of any sunken vessel, craft or similar obstruction, which impedes or endangers navigation.)
(15) [Reserved]
(16) Trespass on U.S. property. Trespass on waterway property or injury to the banks, locks, dams, canals, piers, fences, trees, buildings or any other property of the United States pertaining to the waterway is strictly prohibited. No business, trading or landing of freight or baggage will be allowed on or over Government property, unless a permit or lease approved by the Secretary of the Army has been secured.
(17) Neenah dam outlet works. (i) During periods of high water, when determined to be necessary by the District Engineer, U.S. Army Engineer District, Chicago, to reduce the threat of flooding, it shall be the duty of the person owning, operating, or controlling the dam across the Neenah Channel of the Fox River at Neenah, Wis., acting as agent of the United States, to open or close, or cause to be opened or closed, pursuant to paragraph (a)(17)(ii) of this section, the outlet works of said dam to regulate the passage of water through said outlet works.
(ii) The outlet works of said dam shall be opened when and to the extent directed by the District Engineer or his authorized field representatives, and said outlet works shall thereafter be closed when and to the extent directed by the said District Engineer or his authorized field representative.
(b) Use of the United States drydock on Fox River at Kaukauna, Wis. (1) The drydock being a part of the Fox River improvement, its use will be governed by the general regulations for the use, administration, and navigation of that river, so far as they may be applicable.
(2) The drydock at Kaukauna, when not required for repairs or construction by the United States, may be used by private parties or corporations under certain restrictions and under the supervision and direction of the U.S. District Engineer in charge of the locality or his authorized agent.
(3) The drydock will be loaned to private parties only when no private drydock is available at the time and for the purpose desired. Applicants will be required to establish over their signature the fact that due effort has been made to secure the use of a private drydock and none can be had.
(4) Private parties desiring to use the Kaukauna drydock will give notice to the U.S. Assistant Engineer in local charge at Appleton, Wis., as long in advance as practicable, stating when use of the dock is wanted, nature of repairs required, and the dimensions and character of boat. No boat will enter the dock until the permission of the U.S. District Engineer or the Assistant Engineer above referred to has been obtained.
(5) All private parties or corporations using the Kaukauna drydock will furnish all material and labor, including blocking, when necessary, required for prompt execution of their work, and will also furnish all labor for properly operating, under the immediate personal supervision of an authorized canal employee, gates, and sluices of the drydock. No gate or sluice of the drydock will be operated, or in any way meddled with, except by permission of and under the personal supervision of such authorized canal employee.
(6) No boat will be allowed to occupy the Kaukauna drydock for a longer period than 2 days when other boats are waiting to use the dock, except in cases when, in the opinion of the U.S. District Engineer or his authorized agent, circumstances necessitate and justify a longer use than 2 days. The U.S. District Engineer or his authorized agent is authorized to remove from the drydock any boat using or occupying such dock without his authority, and the expense of such removal will be paid by the party or parties owning such boat.
(7) The wages of all mechanics and laborers, due from private parties for repairs carried on in the Kaukauna drydock, must be paid before the boat leaves the dock.
(8) Repair shop, timber shed, tools, etc., owned by the Government at and near the drydock shall not be used by parties allowed to occupy the drydock.
(9) Lumber and all material needed by parties allowed to use the drydock may be deposited in the drydock yards at such places as may be directed, but only for such time as repairs are being made, and residue must be entirely removed when the boat leaves the dock; general storage will not be permitted.
(10) All refuse and old material taken from boats under repairs must be removed or disposed of, as may be directed, by the owner of the boat or his employees without expense to the Government, and before the boat leaves the dock, and to the satisfaction of the agent in charge of the dock.
(11) The Government charges for the authorized and necessary use and occupancy of the Kaukauna drydock by private boats shall be, until further orders, as follows:
(i) Docking charges (including lay time for the calendar day on which vessel is docked): Tugs, motor boats, and dredges, 75 cents per linear foot; $25 minimum charge. Barges, dump scows, and derrick boats, 65 cents per linear foot; $20 minimum charge.
(ii) Lay-day charges (excluding Sundays and national holidays, unless repairs are made on such Sundays and holidays): For all vessels, 20 cents per linear foot per calendar day or part thereof; $7 per calendar day or part thereof, minimum charge.
(12) The charges for all use or occupancy of the Kaukauna drydock by a boat or private parties, after repairs on such boat have, in the opinion of the U.S. District Engineer or authorized agent, been so far completed as to permit safe removal from the dock, or after such removal has been ordered by the U.S. District Engineer or his authorized agent, shall be $50 per day or part of a day, in addition to any penalties incurred for violation of any of the regulations prescribed by law for the government of the dock and those using it.
(13) The dock will be considered in use by a boat from the time the dock is placed at its disposal until the boat is out of the dock.
(14) The length of all vessels shall be the over-all length measured on the main deck from stem to stern.
(15) The charges for the use of the drydock shall be paid within 10 days from date of bill, which will be submitted to the owner by the District Engineer as promptly as possible after the vessel leaves the dock. If charges are not so paid, the vessel shall be liable to the amount of the charges and the cost of collection in the manner prescribed by law, and the owner of the vessel shall be denied the use of the drydock until all charges and the cost of collection have been paid to the United States.
(16) This section supersedes the regulations for the use of this drydock approved April 10, 1906, which regulations are hereby revoked.
[Regs., Oct. 2, 1926, as amended at 33 FR 11544, Aug. 14, 1968; 36 FR 1253, Jan. 27, 1971; 43 FR 26570, June 21, 1978; 48 FR 13985, Apr. 1, 1983; 56 FR 13765, Apr. 4, 1991]
§ 207.470 Sturgeon Bay and Lake Michigan Ship Canal, Wis.; use and navigation.
(a) Authority of canal officers. The movement of all boats and floating things in the canal and in the approaches thereto shall be under the direction of the superintendent or his authorized assistants, and their orders and instructions must be obeyed.
(b) Signals. On entering the canal at either entrance, steamers or tugs must blow their whistles for 1 minute in order to warn craft approaching from opposite direction and give them time to guard against collisions, by tying up if necessary. All steamers approaching others going in the opposite direction shall slacken speed so as to pass in safety. Compliance is required with rule V of the rules and regulations for the government of pilots, adopted by the U.S. Coast Guard.
Rule V. Whenever a steamer is nearing a short bend or curve in the channel where, from the height of the banks or other cause, a steamer approaching from the opposite direction cannot be seen for a distance of half a mile, the pilot of such steamer, when he shall have arrived within half a mile of such curve or bend, shall give a signal by one long blast of the steam whistle, which signal shall be answered by a similar blast by the pilot of any approaching steamer that may be within hearing. Should such signal be so answered by a steamer upon the farther side of such bend, then the usual signals for the meeting and passing shall immediately be given and answered; but if the first alarm signal of such pilot be not answered, he is to consider the channel clear and govern himself accordingly.
(c) Speed. The rate of speed while passing through the canal shall not exceed 5 miles per hour.
(d) Keeping in the center. The center must be kept all the way through, except in passing other craft. In case of grounding, the rapid or strong working of boat's engines is strictly forbidden.
(e)-(g) [Reserved]
(h) Rafts. (1) The passage of bag or sack rafts, or of loose logs, into or through the canal is prohibited.
(2) Rafts shall be made up with logs parallel to each other, in the direction of raft lengths, secured and held closely together by frequent cross-sticks, chains, or cables.
(3) Rafts shall not be of greater dimensions, either way, than 50 feet wide by 600 feet long, and if longer than 300 feet shall be handled by two tugs.
(4) No raft shall pass through the canal, unless by special permission of the superintendent or his authorized assistants, who will direct a time for passing that will least interfere with other navigation.
(5) Masters of tugs and other persons in charge of rafts are required to avoid damaging the canal revetments, and displacing buoys, spars, or the pedestal of any range light aiding navigation through the canal. They shall keep careful watch when passing aids to navigation, and should any be accidentally displaced, shall report the fact at the earliest possible moment to the superintendent or his authorized assistants.
(i)-(l) [Reserved]
(m) Refuse in canal. No person shall roll or throw any stones, ashes, cinders, or other material into the canal or the approaches thereto, or place any such material on any bank or berm of the canal so that it is liable to be thrown or roll in.
(n)-(o) [Reserved]
[Regs., Feb. 15, 1895, as amended Apr. 14, 1908; 42 FR 57962, Nov. 7, 1977; 56 FR 13765, Apr. 4, 1991]
§ 207.476 The Inland Route—lock in Crooked River, Alanson, Mich.; use, administration, and navigation.
(a) General. The use, administration, and navigation of the lock shall be under the direction and supervision of the District Engineer, U.S. Army Engineer District, Detroit, Mich., and his authorized agents.
(b) Authority of lockmaster. The lockmaster shall be charged with the immediate control and management of the lock, and of the area set aside as the lock area, including the lock approach channels. He shall see that all laws, rules, and regulations for the use of the lock and lock area are duly complied with, to which end he is authorized to give all necessary orders and directions in accordance therewith, both to the employees of the Government and to any and every person within the limits of the lock area, whether navigating the lock or not. No one shall cause any movement of any boat, craft or other floating object in the lock or approaches except by or under the direction of the lockmaster or his assistants.
(c) Operation. The lock operating season will commence and close as determined by the district engineers, Corps of Engineers in charge of the locality, depending on conditions and the need for lockage services. Public notices will be issued announcing the opening and closing dates at least 15 days in advance of such dates.
(d) Maximum allowable dimensions of craft. (1) Overall length—60 feet.
(2) Overall width—16 feet.
(3) Height above water—15 feet when upper pool is at low water datum.
(4) Draft—6 feet when lower pool is at low water datum.
(e) Signals. (1) Craft desiring lockage in either direction shall give notice to the lock tenders, when not farther than 200 yards from the lock, by one long blast (of 10 seconds duration) followed by one short blast (of 3 seconds duration) of whistle, horn, or siren.
(2) Craft not equipped with whistle, horn, or siren may signal for lockage by use of the signal provided for this purpose located near the extreme end of the guide wall to the starboard side of the craft, both upbound and downbound.
(f) The procedures for transit of lock. (1) Stand clear of the lock while the red signal light shows.
(2) When the green signal light shows and the lock horn sounds three blasts, approach and enter the lock.
(3) Full control of the craft must be maintained while entering the lock.
(4) After entrance to the lock is complete, the craft shall be securely moored to the cleats and bitts situated on the lock wall.
(5) While moored in the lock, the operator of the craft shall maintain constant attention to the mooring lines, to provide slack or retain tautness as needed.
(6) The craft shall remain securely moored until the exit lock gate is fully open and the lock horn sounds one blast.
(7) When the exit lock gate is fully open and the lock horn has sounded one blast, the craft shall immediately leave the lock under full control of its operator.
(g) Precedence at lock. The craft arriving first at the lock shall be first to lock through; but precedence will be given to craft belonging to the United States or other local government entities, such as state, county, or municipality. Arrival posts may be established above and below the lock. Craft arriving at or opposite such posts or markers will be considered as having arrived at the locks within the meaning of this paragraph.
[32 FR 9068, June 27, 1967, as amended at 48 FR 6707, Feb. 15, 1983]
§ 207.480 Lake Huron, Mich.; Harbor of refuge, Harbor Beach; use and navigation.
(a) All boats, barges, and vessels entering the harbor will be required to take such positions as may be assigned them by the officer in charge, who will direct their movements, either from the breakwater or from the Government tug on the harbor.
(b) In the absence of any directions as to position, boats, barges, and vessels entering the harbor will observe the following rule: The first steam vessel, or the first steam vessel with consort in tow, on entering the harbor for shelter, will proceed to the upper end of the breakwater. All steam vessels, and all steam vessels with consorts in tow, entering later, will place themselves in a compact position close to those preceding them. Sailing craft will so locate themselves that they will not lie in the way of other vessels entering the harbor. All vessels of every description will in no way place themselves so as to interfere with the work of reconstruction of piers, or repairs, that may be in progress at the time.
(c) The use of chains in making fast to the breakwater will not be permitted. Lines must be attached to the snubbing posts only, and outboard anchors taken in.
(d) Steam craft with barges or vessels in tow will, if practicable, at once place them compactly alongside the breakwater, either taking in the towlines entirely or passing them on the breakwater so as not to interfere in any way with the landing or departure of boats or vessels between them. If impracticable to place them alongside the breakwater, they will each drop anchor and at once take in all towlines extending from one to the other.
(e) Passenger boats will, in general, have the preference as to location and attention by the officer in charge. Rafts will give way to all documented craft.
(f) All classes of boats, barges, vessels, or other floating property making fast to the breakwater must at once place such fenders between themselves and the breakwater as may be thought necessary by the officer in charge to prevent chafing or other damage.
(g) The unloading of wood, coal, ballast, stone, or freight of any class upon the breakwater is expressly prohibited, except in certain cases allowed by special permission from the officer in charge.
(h) Each and every piece of floating property made fast to the breakwater, or anchored in the harbor, must keep outboard from sunset to sunrise a conspicuous white light, and must have upon it and in immediate charge of it a watchman during the entire time such floating property is in the harbor. All colored lights must be at once taken in, or covered, on dropping anchor or making fast to the breakwater.
[Regs., Apr. 3, 1906]
§ 207.560 Sandusky Harbor, Ohio; use, administration, and navigation.
(a)-(c) [Reserved]
(d) No vessel shall moor or anchor to any structure of the United States without the consent of the District Engineer, U.S. Army, in charge of the locality, or his authorized agent.
(e) No vessel shall moor or anchor in or along any improved channel or basin in such manner as to interfere with improvement or maintenance operations therein. Whenever in the opinion of the District Engineer any vessel is so moored or anchored, the owner thereof shall cause said vessel to be moved upon notification from and within the time specified by said District Engineer.
[Regs., May 6, 1938, as amended at 25 FR 8908, Sept. 16, 1960; 42 FR 57962, Nov. 7, 1977]
§ 207.565 Vermilion Harbor, Ohio; use, administration, and navigation.
(a)-(b) [Reserved]
(c) No vessel or other craft shall moor or anchor to any structure of the United States without the consent of the District Engineer, Corps of Engineers.
(d) No vessel or other craft shall moor or anchor in or along any improved channel or basin in such a manner as to interfere with the improvement or maintenance operations therein. Whenever in the opinion of the District Engineer any vessel or craft is so moored or anchored, the owner thereof shall cause such vessel or craft to be moved upon notification from, and within the time specified by, the District Engineer.
[13 FR 9564, Dec. 31, 1948, as amended at 42 FR 51773, Sept. 29, 1977; 42 FR 57962, Nov. 7, 1977]
§ 207.570 Harbors of Huron, Lorain, Cleveland, Fairport, Ashtabula, Conneaut, Ohio; use, administration, and navigation.
(a)-(b) [Reserved]
(c) No vessel shall moor or anchor to any structure of the United States without the consent of the District Engineer, U.S. Army, in charge of the locality, or his authorized agent.
(d) No vessel shall moor or anchor in or along any improved channel or basin in such manner as to interfere with improvement or maintenance operations therein. Whenever in the opinion of the District Engineer any vessel is so moored or anchored, the owner thereof shall cause said vessel to be moved upon notification from and within the time specified by said District Engineer.
[Regs., May 5, 1938, as amended at 25 FR 8908, Sept. 16, 1960; 42 FR 57962, Nov. 7, 1977]
§ 207.580 Buffalo Harbor, N.Y.; use, administration, and navigation.
(a)-(b) [Reserved]
(c) No vessel shall moor or anchor to any structure of the United States without the consent of the District Engineer, U.S. Army, in charge of the locality, or his authorized agent.
(d) No vessel shall moor or anchor in or along any improved channel or basin in such manner as to interfere with improvement or maintenance operations therein. Whenever in the opinion of the District Engineer any vessel is so moored or anchored, the owner thereof shall cause said vessel to be moved upon notification from and within the time specified by said District Engineer.
[Regs., May 5, 1938, as amended at 25 FR 8908, Sept. 16, 1960; 42 FR 57962, Nov. 7, 1977]
§ 207.590 Black Rock Canal and Lock at Buffalo, N.Y.; use, administration, and navigation.
(a) The term “canal” when used in this section will mean all of the Black Rock Waterway, including Black Rock Lock, and all of the lands, piers, buildings, and other appurtenances acquired by letters patent from the State of New York, or constructed for the use of the waterway; the southerly limit thereof being at the southerly end of Bird Island Pier, and the northerly limit being at the downstream end of the guide pier, Black Rock Lock, a length of 3.7 miles.
(b) The canal and all of its appurtenances and the use, administration and navigation thereof shall be in charge of the District Engineer, U.S. Army Engineer District, in charge of the locality, or his authorized agents.
(c) The movement of all vessels, boats, or other floating things in the canal shall be under the direction of the authorized agents of the District Engineer in charge, and their orders and instructions must be obeyed.
(d) For passage through the canal, vessels or boats belonging to the U.S. Government shall have precedence over all others.
(e) All registered vessels or boats must pass through the canal in order of their arrival at the canal limits, unless otherwise directed in accordance with this section.
(f) [Reserved]
(g) No vessel shall pass or approach within 1/4-mile of a vessel bound in the same direction in the Black Rock Canal south of the Ferry Street Bridge. Tugs without tows, tugs towing a single barge under 150 feet in length, and single vessels under 150 feet in length are exempt from this paragraph.
(h) No vessel or boat shall anchor in or moor along the canal except at localities specially designated by the District Engineer or his agent; and no business, trading, or landing of freight or baggage, except such articles as may be readily carried in the hand, will be allowed on or over the canal lands or structures, without the permission of the District Engineer or his agent.
(i) No person or operator of a vessel in the Black Rock Canal, lock or approaching channels shall throw or discharge or permit to be thrown or discharged any solid material of any kind or any petroleum product of any kind into the canal, lock or appurtenant waters.
(j) All vessels and tows shall be navigated with care so as not to strike or disturb the channel buoys or channel markers. If a buoy or other channel marker is accidentally struck, damaged or displaced, the fact shall be reported immediately to the Black Rock Lock, foot of Bridge Street, Buffalo, N.Y., telephone 876-5454.
(k) Ferry Street Bridge: The clearheadroom under the bridge at low water datum is 17.3 feet for a width of 86 feet from the pivot pier, thence decreasing to 12.3 feet at the left (westerly) abutment.
(1) All vessels and boats which cannot pass under the bridge shall, on approaching the bridge, reduce speed sufficiently to enable them to come to a dead stop, without touching the bridge, in case the movable span cannot be lifted. If the wind is dangerously strong, passage of the bridge shall not be attempted by large vessels without the aid of a tug or tugs.
(2) Vessels and boats bound north shall have the right-of-way and priority for passage through the bridge over those bound south.
(3) All vessels and boats desiring passage through the bridge shall signal therefor by one long and two short whistle blasts.
(4) Upon receiving the opening signal, the bridge operator shall answer by giving the same signal on the bridge whistle and he shall then proceed at once to lift the bridge.
(5) In case the bridge cannot be lifted, for any cause, the bridge operator shall answer a vessel signal by giving five short whistle blasts; and the vessel shall then be stopped until the bridge is ready to be lifted, when the bridge operator shall give the whistle signal for passage and the vessel may proceed.
(6) In case the bridge is disabled so that it cannot be lifted for one-half hour or more pending repairs, red flags will be displayed on the bridge in daytime and two red lantern lights, one above the other, at night; and when such signals are displayed no vessel or boat shall signal for or attempt passage through the bridge.
(l) Radio control of vessel movement in Black Rock Canal. (1) The movement of vessels in the Black Rock Canal will be controlled by radio communication between the Black Rock Lock and the vessels desiring to use the canal. Vessels will not be permitted to meet or pass in the channel of restricted width between the southerly end of Bird Island (approximately 3,500 feet northerly along the canal from the North Breakwater South End Light) and the International Railway Bridge near the southerly entrance to the Black Rock Lock. Vessels less than 150 feet in length and tugs towing a single barge under 150 feet in length are not to be included in this special condition. In addition to the control of vessel movements in the restricted section of the canal, radio communications will also be utilized to facilitiate the passage of vessels through the entire canal and the Black Rock Lock.
(2) Radio communication will be the only means of control of vessel traffic in the canal in order to prevent a meeting or passing of vessels in the restricted area, and therefore it is mandatory that all vessels over 150 feet in length and tugs towing a barge or barges over 150 feet in combined length of tow be equipped with radio communication equipment operating on designated frequencies. Any vessel lacking such equipment will not be permitted to enter the canal unless arrangements are made with the Black Rock Lock by land telephone to 876-5454 or marine ship-to-shore facilities immediately before entering the canal.
(3) The Black Rock Lock radio communication equipment operates on VHF(FM) frequencies as follows: VHF—156.8 Mcs—Channel 16—Safety and Calling, VHF—156.7 Mcs—Channel 14—Working; VHF—156.6 Mcs—Channel 12 Working. A listening watch is maintained on VHF Channel 16.
(4) In order that positive control may be maintained it is mandatory that the following procedures be followed in communicating by radio with the Black Rock Lock:
(i) Vessels desiring to enter the Black Rock Canal from either the Buffalo Outer Harbor or the Buffalo River shall call the Black Rock Lock on VHF Channel 16 or by land telephone approximately 15 minutes before the estimated time of arrival at Buffalo Harbor Traffic Lighted Bell Buoy 1 located at latitude N. 42°50.1′ and longitude W. 78°55.4′. Information to be furnished the Black Rock Lock Operator should include the name of the vessel, position, destination, length, draft (forward and aft) and the type of cargo. A second call shall be made to the lock when the vessel is abreast of the Buffalo Harbor Light on the southerly end of the detached West Breakwater. Information furnished the vessel by the Lock Operator will assure the vessel operator of the proper time to enter the Black Rock Canal with a view to safety and minimum delay.
(ii) Vessels desiring to enter the Black Rock Canal from either the Buffalo Outer Harbor or the Buffalo River shall call the Black Rock Lock on VHF Channel 16 or by land telephone to 876-5454 immediately before departing a dock and again when abreast of the North Breakwater South End Light on the southerly end of the North Breakwater.
(iii) In any radio communication from a vessel to the Black Rock Lock, and VHF(FM) frequencies will be utilized.
(iv) In any radio communication from a vessel to the Black Rock Lock, the VHF (FM) frequencies will be utilized if available in preference to the MF (AM) frequencies.
(v) When an initial radio contact has been made with the Black Rock Lock the vessel entering the canal shall maintain a standby watch at the radio until the passage through the canal and lock is completed.
(vi) Failure to comply with the foregoing procedures could result in considerable delay to a vessel and possibly in a collision between vessels in the restricted section of the canal.
(m) Black Rock Lock. All vessels and boats desiring to use the lock shall signal by two long and two short whistle blasts.
(1) Northbound vessels and boats shall not be brought to within less than 300 feet of the upper lock gates, nor shall southbound vessels be brought to within less than 200 feet of the lower lock gates, until the lock is made ready and the lockmaster in charge signals the vessel to enter the lock.
(2) Vessels and boats shall not moor to the approach walls of the lock at either end, for any other purpose than waiting for lockage, except by direction or permission of the lockmaster.
(3) Commercial vessels will receive preference in passage through the locks. Small vessels such as row, sail, and motor boats, bent on pleasure only, will be passed through the lock in company with commercial vessels when small vessels can be safely accommodated or in the absence of commercial vessels may be passed through the lock individually or together in one lockage on the hour if northbound and on the half hour if southbound. However, commercial vessels will receive preference which could delay the passage of pleasure craft. Pleasure craft will not be permitted to pass through the lock with vessels carrying inflammable cargo. Vessels and other large boats when in the lock shall fasten one head line and one spring line to the snubbing posts on the lock walls, and the lines shall not be cast off until the signal is given by the lockmaster for the boats to leave the lock.
(4) Vessels and boats will be passed through the lock in order of their arrival except that the lockmaster may order a small vessel to lock through in company with another vessel, irrespective of the former's order of arrival.
(5) All vessels and boats shall be maneuvered with great care so as not to strike any part of the lock walls, or any gate or appurtenance thereto, or machinery for operating the gates, or the walls protecting the lock approaches.
(6) Vessels and boats shall not enter or leave until the lock gates are fully in their recesses, and the lockmaster has given direction for starting.
(7) [Reserved]
(8) Trespass on lock property is strictly prohibited. However, in that portion of the Black Rock Canal lying between the International Railway Bridge and the northerly end of the westerly lower guide pier, the following conditions shall apply to the embarking or disembarking of crew members or passengers of a vessel transiting the lock:
(i) Only the master or mate and two or three linesmen will be permitted to go ashore from transiting vessels and then only for normal operations and business incident to the transit. A maximum of only four (4) men will be permitted to go ashore from any one ship.
(ii) No crew members will be permitted to board a ship at the locks unless previously requested in writing by the master or owners, and approved by canal authorities.
(iii) No crew member may leave a ship while it is in transit in the lock or canal unless certified in advance as an emergency by the vessel master and approved by canal authorities.
(iv) No guest passengers will be permitted to either board or disembark at the canal or locks.
(9) Schedule of Seasonal Operation:
(i) March 23 through June 14—6 a.m. to 11 p.m., daily.
(ii) June 15 through September 6-24 hours, daily.
(iii) September 7 through November 30—6 a.m. to 11 p.m., daily.
(iv) December 1 through March 22—8 a.m. to 4:30 p.m., daily. During the navigation season the hours may be extended by the district engineer, depending on conditions and the need for lockage service. Public notices will be issued announcing the opening and closing dates at least 10 days in advance of such dates.
(10) Non-operational hours lockings. In addition to the above schedule of operating hours, commercial vessels may be locked through during non-operational hours with prior arrangements made through the U.S. Army Engineer District, Buffalo. Requests for non-operational hours lockings shall be made at least 24 hours in advance by calling (716) 876-5454, extension 2284 or by radio as described in paragraph (l) of this section, Monday through Friday, 9 a.m. to 4 p.m., except holidays. Requests shall include the approximate time of arrival and the name and call letters of the vessel or, if the vessel is not equipped to receive radio messages, a telephone number at which messages may be received for the vessel. If a requested lockage must be delayed, prompt notification shall be given by telephone or radio.
[30 FR 3382, Mar. 13, 1965; 30 FR 3881, Mar. 25, 1965, as amended at 41 FR 34035, Aug. 12, 1976; 42 FR 57962, Nov. 7, 1977; 45 FR 51555, Aug. 4, 1980; 56 FR 13765, Apr. 4, 1991]
§ 207.600 Rochester (Charlotte) Harbor, N.Y.; use, administration, and navigation.
(a)-(b) [Reserved]
(c) No vessel shall moor or anchor to any structure of the United States without the consent of the District Engineer, U.S. Army, in charge of the locality, or his authorized agent.
(d) No vessel shall moor or anchor in or along any improved channel or basin in such manner as to interfere with improvement or maintenance operations therein. Whenever in the opinion of the District Engineer any vessel is so moored or anchored, the owner thereof shall cause said vessel to be moved upon notification from and within the time specified by said District Engineer.
[Regs., May 5, 1938, as amended at 25 FR 8908, Sept. 16, 1960; 42 FR 57962, Nov. 7, 1977]
§ 207.610 St. Lawrence River, Cape Vincent Harbor, N.Y.; use, administration, and navigation of the harbor and U.S. breakwater.
(a)-(c) [Reserved]
(d) Vessels shall observe the following rule in mooring to the breakwater: The first self-propelled vessel stopping at the harbor for shelter will proceed to the upstream end of the breakwater and moor along either side of it. All similar vessels entering later will place themselves in a compact position close to those preceding them. Passenger vessels will, in general, have preference as to location of moorage. Sailing craft will so locate themselves that they will not lie in the way of other vessels entering the harbor. All vessels of every description will place themselves so as not to interfere with any work of reconstruction or repair that may be in progress at the time.
(e) The use of chains in making fast to the breakwater is prohibited. Lines must be attached to the snubbing posts only, and outboard anchors taken in.
(f) Vessels with other craft in tow will, if practicable, at once, moor them compactly along the breakwater, either taking in the towlines or placing the slack in them upon the breakwater in such a manner as not to interfere with other vessels. If necessary to moor alongside of other vessels moored to the breakwater, the towlines shall be taken in or disposed of in such a manner as not to interfere with the departure of vessels moored between them and the breakwater.
(g) Vessels of every description mooring to the breakwater, must place suitable fenders between themselves and the breakwater to protect the timber walings on the breakwater from damage.
(h) The unloading of freight of any class upon the breakwater is expressly prohibited, except in accordance with special permission from the said District Engineer or his representative.
(i) Each and every vessel made fast to the breakwater, or anchored in the harbor without a line made fast to the shore or shore dock, must have at least one experienced person upon it during the entire time said vessel is thus moored in the harbor.
[Regs., May 6, 1938, as amended at 25 FR 8908, Sept. 16, 1960; 42 FR 57962, Nov. 7, 1977]
§ 207.640 Sacramento Deep Water Ship Channel Barge Lock and Approach Canals; use, administration, and navigation.
(a) Sacramento Deep Water Ship Channel Barge Lock and Approach Canals; use, administration and navigation—(1) General. The lock, its approach channels and all its appurtenances, including the highway and railroad bridge, shall be under the jurisdiction of the District Engineer, U.S. Army Engineer District, Sacramento, Federal and Courts Building, 650 Capitol Avenue, Sacramento, California. His designated representative at the locality shall be the lockmaster, who will be in immediate charge of movement and position of all water traffic while at or near the locks and in the barge canals.
(2) Immediate control. The lockmaster shall be charged with the immediate control and management of the lock, bridge, and of the area set aside as the lock area, including the entrance channels. He shall see that all laws, rules and regulations for the use of the lock, bridge and the lock area are duly complied with, to which end he is authorized to give all necessary orders and directions in accordance therewith, both to employees of the Government and to any and every person within the Government lock area. Crews shall render such assistance in the lockage of their craft as may be required by the lockmaster.
(3) Signals—(i) Sound. All craft desiring lockage shall signal by two long blasts followed by two short blasts of the whistle, delivered at a distance of one-half mile from the lock. When the lock is ready for entrance, notice will be given by one long blast from the control house. Permission to leave the lock will be one short blast given by the lockmaster.
(ii) Visual lock traffic signals. Visual signals are located outside of each lock gate on the north guide wall, and will be used in conjunction with sound signals. When the red light is flashing, lock cannot be made ready for entrance immediately, vessel must stand clear. When the amber light is flashing, lock is being made ready, prepare for lockage. When the green light is flashing, lock is ready for entrance, the vessel may proceed with caution into the lock.
(iii) Visual river traffic signals. Visual signals are located on the south bank of the barge canal at the confluence with the Sacramento River and also 1,950 feet upstream on the west bank of the Sacramento River. When the red light is on, a river-bound vessel of a size making passing in the canal hazardous is in the lock or canal. Approaching vessel shall stand clear of canal to permit out-going vessel to pass. When the amber light is on, a river-bound vessel of a size to permit passing is in the lock or canal. Vessel may enter canal with caution. When the green light is on, vessel may enter canal and proceed under full control.
(iv) Radio. The lock is equipped with two-way radio operating on a frequency of 156.60 mc. The frequency is monitored by the lock personnel. Vessels equipped with two-way radio may communicate with the crew operating the lock but communications or signals so received will only augment and not replace the sound and visual signals.
(4) Permissible dimensions of vessels and tows. The lock chamber has a maximum usable width of 86 feet and length of 600 feet. The sill at the harbor end and the bottom of the lock chamber are −13.0 feet elevation, CofE datum, and usually provides a depth of water ranging from 14.0 feet at LLW to 19.4 feet at HHW, with greater depths during large floods in the delta. The sill at the river end is at −10.0 feet elevation, CofE datum, and usually provides a depth of water ranging from 14.6 feet at LLW to 16.8 feet at HHW, with greater depths when the river is high. The depth of water at any time is indicated by staff gages located on the south wall of the lock, riverward and harborward of each lock gate and at the center of the lock. A vessel must not attempt to enter the lock if its beam or length is greater than indicated above, or if its draft exceeds the depth of water indicated by the gages, with due allowance for clearance.
(5) Precedence at lock. Ordinarily, craft will be locked through in order of arrival; however, depending upon whether the lock is full or empty, this precedence may be modified at the discretion of the lockmaster if boats are approaching from the opposite direction and are within reasonable distance of the lock at the time of the approach by the first boat. When several craft are to pass, precedence shall be given as follows:
First: Government owned or controlled craft. Second: Commercial craft. Third: Passenger boats. Fourth: Small vessels and pleasure boats.
(6) Loss of turn. Boats that fail to enter the lock with reasonable promptness, after being authorized to do so, shall lose their turn.
(7) Multiple lockage. The lockmaster shall decide whether one or more vessels may be locked through at the same time.
(8) Speed. Vessels shall not be raced or crowded alongside another in the barge canals. When entering the barge canals and lock, speed shall be reduced to a minimum consistent with safe navigation. As a general rule, when a number of vessels are entering the lock, the following vessel shall remain at least 200 feet astern of the vessel ahead. No overtaking, except when directed by lockmaster, will be permitted.
(9) Lockage of small boats—(i) General. The lockage of pleasure boats, skiffs, fishing boats and other small craft will be coordinated with the lockage of commercial craft. If no commercial craft are scheduled to be locked through within a reasonable time, not to exceed one hour after the arrival of the small craft at the lock, separate lockage will be made for such small craft.
(ii) Signals. Small boats desiring to use the lock will sound two long blasts followed by two short blasts of the horn. When the lock is ready for entrance, the lockmaster will notify the small boat by one long blast of the horn; or through the public address system. Permission to leave the lock will be given by the lockmaster by one short blast of the horn.
(10) Mooring in lock. All boats, when in the lock, shall be moored to the fastenings provided for that purpose, by bow and stern lines and other spring lines as may be necessary, and the lines shall not be let go until the signal is given by the lockmaster for the craft to leave the lock.
(11) Waiting for lockage. The mooring or anchoring of boats or other craft in the approaches to the lock, where such mooring will interfere with navigation of the lock is prohibited. All boats, barge tows and other craft to be passed through the lock shall lie in designated waiting areas in such manner as not to interfere with the navigation of the lock or its approaches, and, if a barge tow is to be divided into sections for locking, the sections shall be brought into the lock as directed by the lockmaster. After passing through the lock, the sections shall be reassembled at such a distance from the entrance as not to obstruct or interfere with navigation of the lock or its approaches.
(12) Delay in lock. Boats or barges must not obstruct navigation by unnecessary delays in entering or leaving the lock.
(13) Damage to lock or other structures. The regulations contained in this paragraph shall not relieve the owners and operators of vessels from liability for any damage by their operations to the lock or other structures. They must use great care not to strike any part of the lock, any gate or appurtenance thereto, or machinery for operating the gates, or the walls protecting the banks of the approach canals. All boats with metal nosings or projecting irons, or rough surfaces that would be liable to damage the gates or lock walls, will not be permitted to enter the lock unless provided with suitable buffers and fenders.
(14) Tows. Tows shall be made up outside the canal entrance. All vessels engaged in towing other vessels not equipped with a rudder shall use two tow lines or a bridge and one tow line. If the vessel in tow is equipped with a rudder, one tow line may be used. All tow lines or hawsers must be hauled as short as practicable for safe handling of tows.
(15) Crew to move craft. The pilots in charge of tows and persons in charge of other craft must provide a sufficient number of men to handle lines in mooring craft and to move barges and other craft into and out of the lock easily and promptly.
(16) Handling valves, gates, bridges and machinery. No person, unless authorized by the lockmaster shall open or close any bridge, gate, valve or operate any machinery in connection with the lock; but the lockmaster may, under emergency conditions, call for assistance from the master of any boat using the lock, should such aid be necessary, and when rendering such assistance, the man so employed shall be strictly under the orders of the lockmaster.
(17) Landing of freight. No one shall land freight or baggage on or over the walls of the lock so as in any way to delay or interfere with navigation or the operation of the lock.
(18) Refuse in lock. No material of any kind shall be thrown or discharged into the lock, and no material of any kind shall be deposited into the lock area.
(19) [Reserved]
(20) Persistent violation of regulations. If the owner or pilot of any boat persistently violates the regulations of this paragraph after due notice of the same, lockage may be refused by the lockmaster at the time of the violation or subsequent thereto, as required in the interest of public safety or protection of Government property.
(21) Other laws and regulations. In all other respects, the existing Federal laws, rules and regulations affecting navigable waters of the United States will govern in the use, administration and navigation of the ship channel, lock and its approaches.
[26 FR 11201, Nov. 28, 1961, as amended at 27 FR 4737, May 18, 1962; 27 FR 10484, Oct. 27, 1962; 28 FR 8461, Aug. 17, 1963; 31 FR 6590, May 3, 1966; 33 FR 14166, Sept. 19, 1968; 42 FR 17120, Mar. 31, 1977; 42 FR 57962, Nov. 7, 1977; 48 FR 6708, Feb. 15, 1983; 50 FR 42696, Oct. 22, 1985; 51 FR 25198, July 11, 1986; 56 FR 13765, Apr. 4, 1991]
§ 207.680 Willamette River, Oreg.; use, administration, and navigation of canal and locks at Willamette Falls, Oreg.
(a) Administration—(1) Administrative jurisdiction. The canal and locks and all appurtenances shall be in the charge of the District Engineer, Portland District, Corps of Engineers, Department of the Army, 319 S.W. Pine Street, Portland, Oregon 97208. The representative of the District Engineer at the locality shall be the lockmaster, who shall receive his orders and instructions from the district engineer. In case of emergency, however, the lockmaster shall have authority to take such steps as may be immediately necessary without waiting for instruction from the district engineer.
(2) Operational jurisdiction. The lock master shall be charged with the immediate control and management of the canal and locks and the grounds and public property pertaining thereto. He shall see that all laws, rules and regulations, for the use of the canal and grounds are duly complied with, to which end he is authorized to give all necessary orders and directions in accordance therewith, both to employees of the Government and to any and every person within the limits of the canal and locks or grounds pertaining thereto, whether navigating the canal or not. In case of the absence or disability of the lock master, his duty shall be performed by an assistant or other employee to be designated by the District Engineer.
(b) Use and navigation—(1) Authority of lock master. The lock master or his assistants shall direct the movement, operation, and moorage of all vessels, boats, rafts, barges, or other floating things using the locks, while they are in the locks, the canal basin, or in either the upstream or downstream lock approaches. Crews of vessels, boats, rafts, barges, or other floating things seeking lockage shall render such assistance as the lock master or his assistants may require.
(2) Signals. All vessels desiring lockage shall signal the same by one long and one short blast of the whistle, delivered at a distance of approximately 1,000 feet from the locks. Requests for lockage may also be made by contacting the lockmaster on VHF-FM radio on channel 14, at WUJ 363, Willamette Falls Locks or by telephone or otherwise notifying the lockmaster's office. Notice to vessels desiring lockage will be given by red and green traffic lights. Vessels may enter locks on green lights, but must await green signal when lights are red. Permission to leave the lock will be given in the same manner. In the event a failure occurs and the referenced lights cannot be operated, the lockmaster will indicate by voice or by hand or lantern signals when vessels may enter or leave the locks.
(3) Controlling dimensions. For lockage purposes the maximum length of space available is 175 feet and the maximum clear width available is 37 feet. All vessels, boats, rafts, barges, or other floating things of less size than the foregoing dimensions can pass through the locks. The controlling water depth over the intermediate miter sills throughout the locks is 6.5 feet. However, the depth on the sill of the upstream gate at low water is 7.5 feet and over the downstream sill is 8.4 feet. The elevation of the upstream sill is 43.7 feet and of the downstream sill is −6.4 feet, corresponding to the elevations shown on the gages provided at both the downstream and upstream approaches to the locks. All vessels, boats, rafts, barges, and other floating things of which the dimensions or draft are greater than will permit clearing any of the above indicated elevations shall be prohibited from entering the locks. All vessels, boats, rafts, barges or other floating things entering the locks in violation of the above shall be responsible for all resulting damages.
(4) Precedence at locks. Ordinarily the vessel, boat, raft, barge, or other floating thing arriving first at the lock will be locked through first. In the event of a simultaneous approach from opposite directions ascending craft will ordinarily be locked through first. When several boats are to be passed through the locks, the order of precedence shall be as follows:
(i) To boats owned by the United States or employed upon river and harbor improvement work.
(ii) To passenger boats.
(iii) To freight and tow boats.
(iv) To rafts.
(v) To small vessels and pleasure craft.
The lock master shall have authority to digress from the above precedence in order to eliminate reversing the flow of traffic through the locks when both upbound and downbound lockages are in waiting.
(5) Entrance to locks. The lock master shall decide whether one or more vessels may be locked through at the same time. No one shall attempt to enter the locks with a vessel or attempt to cause a vessel to enter the locks until he is authorized by the lock master to do so. No one shall take a vessel, or cause a vessel to be taken, within the limits of 500 feet above the upper gate and 300 feet below the lower gate, except for the purpose of entering the locks; and not for this purpose until it has been indicated to him by a proper person by signal that the lock is ready to receive the vessel. All vessels within the foregoing limits must be operated under “slow bell” and be kept constantly under control.
(6) Lockage of small boats. Pleasure boats, skiffs, fishing boats, and other small craft may be passed through the locks singularly, in groups, or as part of a lockage of other than pleasure craft. A continual flow of traffic in one direction will not be interrupted or reversed to accommodate these small pleasure boats. However, any such small boat will be accommodated at such time as the lock master upon receipt of a request for lockage deems such action will not interfere with other traffic. The decision of the lock master shall be final as to whether craft requesting lockage is defined as a pleasure boat.
(7) Use of canal locks. No person, unless authorized by the lockmaster or his assistants, shall open or close any bridge, lock gate, wicket gate, or operate any lock machinery, or in any way interfere with any mechanism or appliance connected with the operation of the locks, nor shall anyone interfere with the employees in the discharge of their duties. The lockmaster or his assistants may call for aid from the persons in charge of any craft, vessel, or raft using the lock should such aid be necessary. Persons rendering such assistance shall be strictly under the orders of the lockmaster. The Government reserves the right to refuse lockage to any vessel, craft or raft when the persons in charge thereof refuse to give such assistance when it is requested. The persons in charge of vessels with tows or rafts, barges and other craft must provide sufficient personnel, lines and towing equipment of sufficient power to insure at all times full control of such tows, rafts, barges and other craft while moving into and through the locks, unless otherwise prearranged with the lockmaster. A copy of these regulations shall be kept on board each vessel regularly engaged in navigating the locks. Copies may be obtained without charge from the lockmaster or from the District Engineer, Corps of Engineers, Department of the Army, 319 S.W. Pine Street, Post Office Box 2946, Portland, Oregon 97208.
(8) Petroleum vessels. All tankers, barges, and other floating equipment, used for transporting inflammable liquids, either with or without cargo, shall be equipped with fixed timber fenders and, if not so equipped, shall have aboard an adequate number of suitable fenders of timber, rubber, or rope which are to be placed between the vessel and unfendered lock structures. All such barges or other vessels navigating without power within the canal or locks must be assisted by one or more tugs of sufficient power to insure full control at all times whether passing upstream or downstream through the locks with or without cargo.
(9) Mooring in locks. All boats, barges, rafts, and other craft when in the locks shall be moored by head and spring lines and such other lines as may be necessary to the fastenings provided for that purpose; and the lines shall not be unloosed until the signal is given for the vessel to leave the lock.
(10) Mooring while waiting for lockage. The mooring of boats, tows or other craft in the approaches to the locks where such mooring will interfere with navigation or other vessels to or from the locks is prohibited.
(11) Delays. Boats, barges, rafts, or other craft must not obstruct navigation by unnecessary delay in entering or leaving the locks. Vessels failing to enter the locks with reasonable promptness, when signaled to do so, and vessels arriving at the locks with their tows in such shape so as to impede lockage shall forfeit their turn.
(12) Landing of freight. No freight or baggage shall be unloaded on or over the walls of the canal or locks. Freight and baggage consigned to the Willamette Falls locks shall be unloaded only at such places as may be provided for this purpose or as directed by the lock master.
(13) Refuse in canal or locks. No refuse or other material shall be thrown or dumped from vessels into the canal and locks, or deposited in the lock area, or placed on the berm of the canal so that it is liable to be thrown or washed into the waterway. Violations of this paragraph (b)(13) shall be subject to sections 13 and 16 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 407, 411).
(14) Damage to locks or other structures. The regulations contained in this section shall not affect the liability of the owners and operators of vessels for any damage caused by their operations to the locks or other structures. Persons in charge of vessels and log rafts passing through the locks must use great care to prevent the vessels or log rafts from striking any gate or appurtenance thereto. All boats or barges with metal nosings, or projecting irons, or rough surfaces, and log rafts with dragging cables that may damage any part of the lock structures will not be permitted to enter the locks unless said craft are provided with suitable protective buffers and fenders and log rafts are free of loose, dragging cables.
(c) [Reserved]
(d) Trespass. No one shall trespass on the grounds or buildings, and everyone shall be deemed guilty of trespass within the meaning of this paragraph who shall willfully or carelessly damage or disfigure the canal and locks or any part thereof, or any building or appliance on the grounds, or who shall carry on business or trading of any sort, or shall build any fishing stand or lead, or set any fish net within the limits of the reservation, or do any act to or on the grounds or buildings which would be recognized by law as a trespass.
(e) Definitions. Except as otherwise provided in paragraph (b)(6) of this section, whenever such a word as “vessel”, “boat”, “barge”, “raft”, or the like is used in this section, it shall include all types of floating things which may be subject to lockage. Failure to refer specifically to a type of floating thing by its name shall not mean exclusion thereof from applicability of this section.
[19 FR 5816, Sept. 9, 1954, as amended at 35 FR 14988, Sept. 26, 1970; 48 FR 10062, Mar. 10, 1983; 56 FR 13765, Apr. 4, 1991]
§ 207.718 Navigation locks and approach channels, Columbia and Snake Rivers, Oreg. and Wash.
(a) General. All locks, approach channels, and all lock appurtenances, shall be under the jurisdiction of the District Engineer, Corps of Engineers, U.S. Army, in charge of the locality. The district engineer may, after issuing a public notice and providing a 30-day opportunity for public comment, set (issue) a schedule for the daily lockage of recreational vessels. Recreational vessels are pleasure boats such a row, sail, or motor boats used for recreational purposes. Commercial vessels include licensed commercial passenger vessels operating on a published schedule or regularly operating in the “for hire” trade. Any recreational schedule shall provide for a minimum of one scheduled recreation lockage upstream and downstream (two lockages) each day. At the discretion of the district engineer, additional lockages may be scheduled. Each schedule and any changes to the schedule will be issued at least 30 days prior to implementation. Prior to issuing any schedule or any change to the schedule, the district engineer will consider all public comments and will evaluate the expected energy situation, water supply, and recreation use of the lock to determine the seasonal need for the schedule or change in schedule. The district engineer's representative at the locks shall be the project engineer, who shall issue orders and instructions to the lockmaster in charge of the lock. Hereinafter, the term “lockmaster” shall be used to designate the person in immediate charge of the lock at any given time. In case of emergency and on all routine work in connection with the operation of the lock, the lockmaster shall have authority to take action without waiting for instructions from the project engineer.
(b) Lockage control. The Lock Master shall be charged with immediate control and management of the lock, and of the area set aside as the lock area, including the lock approach channels. Upstream and downstream approach channels extend to the end of the wing or the guide wall, whichever is longer. At Bonneville lock the upstream approach channel extends to the mooring tie offs at Fort Rains and the downstream approach channel extends to the downstream tip of Robins Island. The Lock Master shall demand compliance with all laws, rules and regulations for the use of the lock and lock area and is authorized to issue necessary orders and directions, both to employees of the Government or to other persons within the limits of the lock or lock area, whether navigating the lock or not. Use of lock facilities is contingent upon compliance with regulations, Lock Master instructions and the safety of people and property.
(c) Authority of Lock Master. No one shall initiate any movement of any vessel in the lock or approaches except by or under the direction of the Lock Master. (“Vessel” as used herein includes all connected units, tugs, barges, tows, boats or other floating objects.)
(d) Signals—(1) Radio. All locks are equipped with two-way FM radio operating on channel 14, frequency of 156.700 MHz, for both the calling channel and the working channel. Vessels equipped with two-way radio desiring a lockage shall call WUJ 33 Bonneville, WUJ 34 The Dalles, WUJ 35 John Day, WUJ 41 McNary, WUJ 42 Ice Harbor, WUJ 43 Lower Monumental, WUJ 44 Little Goose, or WUJ 45 Lower Granite, at least one-half hour in advance of arrival since the Lock Master is not in constant attendance of the locks. Channel 14 shall be monitored constantly in the vessel pilot house from the time the vessel enters the approach channel until its completion of exit. Prior to entering the lock chamber, the commercial freight or log-tow vessel operator shall report the nature of any cargo, the maximum length, width and draft of the vessel and whether the vessel is in any way hazardous because of its condition or the cargo it carries or has carried.
(2) Pull-cord signal stations. Pull-cord signal stations marked by large instructional signs and located near the end of the upstream and downstream lock entrance walls may be used in place of radios to signal the Lock Master for a lockage.
(3) Entering and exit signals. Signal lights are located outside each lock gate. When the green (go) light is on, all vessels will enter in the sequence prescribed by the Lock Master. When the red (stop) light is on, the lock is not ready for entrance and vessels shall stand clear. In addition to the above visual signals, the Lock Master will signal that the lock is ready for entrance by sounding one long blast on the lock air horn. The Lock Master will signal that the lock is ready for exit by lighting the green exit light and sounding one short blast on the air horn.
(4) Craft lockage-readiness signal. Upon query from Lock Master, a vessel operator will signal when he is properly moored and ready for the lockage to begin.
(e) Permissible dimensions of vessels. Nominal overall dimensions of vessels allowed in the lock chamber are 84 feet wide and 650 feet long. Depth of water in the lock depends upon river levels which may vary from day to day. Staff gauges showing the minimum water level depth over gate sills are located inside the lock chamber near each lock gate and outside the lock chamber near the end of both upstream and downstream guide walls, except at Bonneville where the staff gauges show water levels in feet above MSL and are located on the southern guide walls at the upstream and downstream miter gates. Bonneville's upstream sill elevation is 51 feet MSL and the downstream sill elevation is −12 feet MSL. Depth over sill at Bonneville is determined by subtracting the sill elevation from the gauge reading. Vessels shall not enter the navigation lock unless the vessel draft is at least one foot less than the water depth over the sill. Information concerning allowable draft for vessel passage through the locks may be obtained from the Lock Master. Minimum lock chamber water level depth is 15 feet except at Ice Harbor where it is 14 feet and at Bonneville where it is 19 feet. When the river flow at Lower Granite exceeds 330,000 cubic feet per second the normal minimum 15-foot depth may be decreased to as little as eight feet.
(f) Precedence at lock. Subject to the order of precedence, the vessel or tow arriving first; at the lock will be locked through first, however, this precedence may be modified at the discretion of the lockmaster. If immediate passage is required, lockage of vessels owned or operated by the United States shall take precedence. The precedence of all other vessels shall be as follows:
(1) When a recreational vessel lockage schedule is in effect, at the appointed time for lockage of recreation craft, recreation craft shall take precedence; however, commercial vessels may be locked through with recreation craft if safety and space permit. At other than the appointed time, the lockage of commercial and tow vessels shall take precedence and recreational craft may (only) lock through with commercial vessels only as provided in paragraph (h) of this section.
(2) If a recreational vessel lockage schedule is not in effect, commercial and tow vessels shall take precedence. Recreational craft may be locked through with commercial craft. If no commercial vessels are scheduled to be locked through within a reasonable time, not to exceed one hour after the arrival of the recreational vessels at the lock, the recreational vessel may be locked through separately. If a combined lockage cannot be arranged, the recreational craft shall be locked through after waiting three commercial lockages.
(g) Loss of turn. Vessels that fail to enter the lock with reasonable promptness, after being authorized to do so, shall lose their turn.
(h) Lockage—(1) Multiple lockage. The Lock Master shall decide whether one or more vessels or tows may be locked through at the same time. Vessels with flammable or highly hazardous cargo will be passed separately from all other vessels. Hazardous materials are described in part 171, title 49, Code of Federal Regulations. Flammable materials are defined in the National Fire Code of the National Fire Protection Association.
(2) Recreational craft. By mutual agreement of (all parties,) the lockmaster and the captains of the vessels involved, recreational vessels may be locked through with commercial vessels. Under the recreational vessel schedule, separate lockage will not be made by recreational vessels except in accordance with the recreational lockage schedule or when circumstances warrant, such as in an emergency. When recreational craft are locked simultaneously with commercial vessels, the recreational vessel will enter the lock chamber after the commercial vessel is secured in the chamber and when practicable will depart while the commercial vessel remains secured.
(3) Special schedules. Recreational boating groups may request special schedules by contacting the district engineer. The schedule for the daily lockage of recreational vessels will indicate the number of boats required for a special schedule and how many days' notice is required in order to arrange a special schedule.
(i) Mooring in approaches prohibited. Mooring or anchoring in the approaches to the lock is prohibited where such mooring will interfere with navigation.
(j) Waiting for lockage. Vessels waiting for lockage shall wait in the clear outside of the lock approach channel, or contingent upon permission by the Lock Master, may at their own risk, lie inside the approach channel at a place specified by the Lock Master. At Bonneville, vessels may at their own risk, lay-to at the downstream moorage facility on the north shore downstream from the north guide wall provided a 100-foot-wide open channel is maintained.
(k) Mooring in lock. All vessels must be moored within the lock chamber so that no portion of any vessel extends beyond the lines painted on the lock walls. Moorage within the lock chamber will be to floating mooring bits only and will be accomplished in a proper no-slip manner. Small vessels will not be locked with a large vessel unless the large vessel is so moored (two mooring bits) that no lateral movement is possible. The vessel operator will constantly monitor the position of his vessel and his mooring bit ties to assure that there is no fore or aft movement of his vessel and lateral movement is minimized. Propulsion by vessels within the lock chamber will not be permitted during closure operation of a lock chamber gate or as otherwise directed by the Lock Master.
(l) Crew to move craft. During the entire lockage, the vessel operator shall constantly attend the wheelhouse, be aware of the vessel's position, and monitor radio channel 14 on frequency 156.700 MHz, or otherwise be constantly able to communicate with the Lock Master. At a minimum, vessels shall be as vigilantly manned as if underway.
(m) Speed. Vessels shall be adequately powered to maintain a safe speed and be under control at all times. Vessels shall not be raced or crowded alongside another in the approach channels. When entering the lock, speed shall be reduced to a minimum consistent with safe navigation. As a general rule, when a number of vessels are entering the lock, the following vessel shall remain at least 200 feet astern of the vessel ahead.
(n) Delay in lock. Vessels shall not unnecessarily delay any operation of the locks.
(o) Landing of freight. No freight, baggage, personnel, or passengers shall be landed on or over the walls of the lock, except by permission and direction of the Lock Master.
(p) Damage to lock or other structures. The regulations in this section shall not relieve owners and/or operators of vessels from liability for any damage to the lock or other structures or for the immediate removal of any obstruction. No vessel in less than stable floating condition or having unusual sinking potential shall enter the locks or its approaches. Vessels must use great care not to strike any part of the lock, any gate or appurtenance thereto, or machinery for operating the gates, or the walls protecting the banks of the approach channels. All vessels with projecting irons, or rough surfaces which may damage the gates or lock walls, shall not enter the lock unless provided with suitable buffers and fenders. Vessels having chains, lines, or drags either hanging over the sides or ends or dragging on the bottom for steering or other purposes will not be permitted to pass.
(q) Tows. Prior to a lockage, the person in charge of a vessel towing a second vessel by lines shall, at a safe distance outside of the incoming approach channel, secure the second vessel to the towing vessel and keep it secured during the entire course of a lockage and until safely clear of the outgoing approach channel.
(r) Violation of regulations. Any violation of these regulations may subject the owner or master of any vessel to any or all of the following: (1) Penalties prescribed by law of the U.S. Government (33 U.S.C. part 1); (2) Report of violation to the titled owner of the vessel; (3) Report of violation to the U.S. Coast Guard; (4) Refusal of lockage at the time of violation.
(s) Refuse in locks. No material of any kind shall be thrown or discharged into the lock, or be deposited in the lock area. Vessels leaking or spilling cargo will be refused lockage and suitable reports will be made to the U.S. Coast Guard. Deck cargo will be so positioned so as not to be subject to falling overboard.
(t) Handling valves, gates, bridges, and machinery. No person, unless authorized by the Lock Master, shall open or close any bridge, gate, valve, or operate any machinery in connection with the lock. However, the Lock Master may call for assistance from the master of any vessel using the lock, should such aid be necessary; and when rendering such assistance, the person so employed shall be directly under the orders of the Lock Master. Masters of vessels refusing to provide such assistance when it is requested of them may be denied the use of the lock by the Lock Master.
(u)-(v) [Reserved]
(w) Restricted areas. No vessel shall enter or remain in any restricted area at any time without first obtaining permission from the District Engineer, Corps of Engineers, U.S. Army, or his duly authorized representative.
(1) At Bonneville Lock and Dam. The water restricted to all vessels, except Government vessels, are described as all waters of the Columbia River and Bradford Slough within 1,000 feet above the first powerhouse, spillway, and second powerhouse (excluding the new navigation lock channel) and all waters below the first powerhouse, spillway, second powerhouse, and old navigation lock. This is bounded by a line commencing from the westernmost tip of Robins Island on the Oregon side of the river and running in a South 65 degrees West direction a distance of approximately 2,100 feet to a point 50 feet upstream of the Hamilton Island Boat Ramp on the Washington shore. Signs designate the restricted areas. The approach channel to the new navigation lock is outside the restricted area.
(2) At the Dalles Dam. The waters restricted to only Government vessels are described as all downstream waters other than those of the navigation lock downstream approach channel which lie between the Wasco County Bridge and the project axis including those waters between the powerhouse and the Oregon shore and all upstream waters other than those of the navigation lock upstream approach channel which lie between the project axis and a line projected from the upstream end of the navigation lock guide wall to the junction of the concrete structure with the earth fill section of the dam near the upstream end of the powerhouse.
(3) At the John Day Dam. The waters restricted to only Government vessels are described as all of the waters within a distance of about 1,000 yards above the dam lying south of the navigation channel leading to the lock and bounded by a line commencing at the upstream end of the guide wall, and running in a direction 54°01′37″ true for a distance of 771 yards, thence 144°01′37″ true across the river to the south shoreline. The downstream limit is marked by orange and white striped monuments on the north and south shores.
(4) At McNary Lock and Dam. The waters restricted to all vessels, except to Government vessels, are described as all waters commencing at the upstream end of the Oregon fish ladder thence running in the direction of 39°28′ true for a distance of 540 yards; thence 7°49′ true for a distance of 1,078 yards; thence 277°10′ for a distance of 468 yards to the upstream end of the navigation lock guidewall. The downstream limits commence at the downstream end of the navigation lock guidewall thence to the south (Oregon) shore at right angles and parallel to the axis of the dam. Signs designate the restricted areas.
(5) At Ice Harbor Lock and Dam. The waters restricted to all vessels, except Government vessels, are described as all waters within a distance of about 800 yards upstream of the dam lying south of the navigation lock and bound by the line commencing at the upstream end of the guidewall, and running a direction of 91°10′ true for a distance of 575 yards; thence 162°45′ to the south shore, a distance of about 385 yards. The downstream limits commencing at the downstream end of the guidewall; thence to the south shore, at right angles and parallel to the axis of the dam. Signs designate the restricted areas.
(6) At Lower Monumental Lock and Dam. The waters restricted to all vessels, except Government vessels, are described as all waters commencing at the upstream of the navigation lock guidewall and running in a direction of 46°25′ true for a distance of 344 yards; thence 326°19′ true for a distance of 362 yards; thence 243°19′ true for a distance of 218 yards; thence 275°59′ true to the north shore a distance of about 290 yards. The downstream limits commence at the downstream end of the navigation lock guidewall; thence to the north shore, at right angles and parallel to the axis of the dam. Signs designate the restricted areas.
(7) At Little Goose Lock and Dam. The waters restricted to all vessels, except Government vessels, are described as all waters commencing at the upstream of the navigation lock guidewall and running in a direction of 60°37′ true for a distance of 676 yards; thence 345°26′ true for a distance of 494 yards; thence 262°37′47″ true to the dam embankment shoreline. The downstream limits commence 512 yards downstream and at right angles to the axis of the dam on the south shore; thence parallel to the axis of the dam to the north shore. Signs designate the restricted areas.
(8) At Lower Granite Lock and Dam. The waters restricted to all vessels, except Government vessels, are described as all waters commencing at the upstream of the navigation lock guidewall thence running in the direction of 131°31′ true for a distance of 608 yards; thence 210°46′ true to the south shore, a distance of about 259 yards. The downstream limits commence at the downstream end of navigation lock guidewall; thence to the south shore, at right angles and parallel to the axis of the dam. Signs designate the restricted areas.
[43 FR 3115, Jan. 23, 1978, as amended at 52 FR 22310, June 11, 1987; 56 FR 13765, Apr. 4, 1991; 65 FR 4125, Jan. 26, 2000; 71 FR 25503, May 1, 2006]
§ 207.750 Puget Sound Area, Wash.
(a) Waterway connecting Port Townsend and Oak Bay; use, administration and navigation—(1) Works to which the regulations apply. The “canal grounds” when used in this paragraph shall mean that area between the south end of the jetties in Oak Bay and the northern end of the dredge channel approximately 400 yards northwest of Port Townsend Canal Light. The “canal” is the water lying between these limits and the banks containing the same.
(2) [Reserved]
(3) Trading, landing, etc. No business, loading, or landing of freight or baggage will be allowed on or over the canal piers or bulkheads.
(4) Refuse. No person shall throw material of any kind into the canal.
(5) [Reserved]
(6) Obstructions. On the canal's being obstructed by a vessel, raft, or other craft, by sinking, grounding, or otherwise, the District Engineer, Seattle, shall be notified by telephone or telegraph as soon as possible by the person in charge of the obstructing vessel, raft, or craft.
(b) Lake Washington Ship Canal; use, administration and navigation—(1) Definitions. The term “canal” as used in the regulations in this paragraph shall include the water area in the locks and the channel and adjacent waters from a point 5,500 feet northwest of the Burlington Northern, Inc. railway bridge to the east end of the channel opposite Webster Point, Lake Washington. The term “canal grounds” shall include all grounds set aside for the use of the canal or occupied in its construction.
(2) Supervision. The canal and all its appurtenances shall be under the supervision of the District Engineer, Corps of Engineers, Seattle. The District Engineer will detail as many assistants as may be necessary for the efficient operation of the canal and the enforcement of the regulations in this paragraph. The movement of all vessels and other floating things in the canal and approaches thereto shall be under the direction of the District Engineer and his authorized assistants. All orders given under the regulations to any master or person in charge of any vessel, raft, or other watercraft by the District Engineer or his authorized assistants, either in person or through any canal operative, shall be acknowledged and obeyed. Failure to see, understand, or comply with signals or instructions shall constitute a violation of the regulations. Any person refusing to comply with the regulations or any orders given in pursuance thereof may be denied the privileges of the canal or canal grounds.
(3) Speed. To avoid damage to other vessels and to property along the shores, all vessels shall proceed at reduced speed in the canal as follows:
(i) From the west entrance of the Lake Washington Ship Canal to the western end of the west guide pier of the Hiram M. Chittenden Locks, and from the east end of the easternmost guide pier of said Locks to the white flashing dolphin located south of Webster Point on Lake Washington, including all of Salmon Bay, Lake Union, Portage Bay, and Union Bay, it shall be unlawful for any person to operate any watercraft or vessel at a speed in excess of 7 nautical miles per hour within 200 feet of any shoreline, pier, restricted area or shore installation.
(ii) From the western end of the aforesaid west guide pier to the eastern end of the aforesaid east guide pier at said Locks, it shall be unlawful for any person to operate any watercraft or vessel at a speed in excess of 4 nautical miles per hour.
Note:
Signs are located along the canal to indicate permissible speeds.
(4) Traffic signal lights. In addition to the lock signal lights described in paragraph (g)(5)(ii) of this section, a red light, and a green light are installed on the west side of the Ballard Bridge, on the east side of the Fremont Bridge, 1,000 feet west of the Montlake Bridge, and 1,000 feet east of the Montlake Bridge, for the guidance of vessels approaching the sections of the canal between Salmon Bay and Lake Union and between Lake Union and Lake Washington, respectively. Vessels of 300 gross tons and over and all vessels with tows, except as hereinafter provided, shall not pass the red lights. The green lights will indicate that vessels may proceed. Vessels of less than 300 gross tons without tows may disregard these signals, but they shall travel at very slow speed when passing other vessels. Vessels of 300 gross tons and over and vessels with tows, except logs, whose destination is easterly between the Ballard Bridge and a point 2,500 feet east of the Ballard Bridge, may pass the red signals on the Ballard Bridge, provided, such passage will not interfere with approaching traffic.
(5) Approaching and passing through locks—(i) Signals for locks. Vessels with tows desiring to use the locks shall so indicate by two long and three short blasts of a whistle, horn, or megaphone. All other vessels desiring to use the locks shall so indicate by two long and two short blasts.
Note:
The term “long blasts” means blasts of four seconds duration, and the term “short blasts” means blasts of one second duration. Signals for the opening of drawbridges are prescribed in § 117.795 of chapter I.
(ii) Lock signal lights. Red and green signal lights are installed on the guide pier west of the Burlington Northern, Inc. railway bridge below the locks. The green light will indicate to vessels bound for the large lock that the lock has been made ready. If the red light is burning, vessels bound for the large lock shall moor at the pier. Vessels bound for the small lock shall be guided into the small lock by traffic signals thereon. The masters of all vessels approaching the locks from Puget Sound shall be alert to receive and shall immediately comply with instructions by voice or signal from the employee on the west pier.
(iii) Precedence at locks. All vessels approaching the locks shall stop at the points indicated by signs placed on the canal piers or as directed by a lockman until ordered to proceed into the lock. Unless otherwise directed by the District Engineer or his authorized assistants, vessels owned or operated by the United States or the City of Seattle and passenger vessels operating on a regular schedule shall have precedence over all others in passing through the locks. Registered merchant vessels shall have precedence over pleasure craft, which shall pass through in the order of their arrival at the locks, and both shall have precedence over vessels towing floated timber or logs. Tows of floated timber and logs may be denied the use of the locks during certain hours when both locks are busy passing other traffic. However, advance notice will be given towboat companies as to the periods when log tows will be denied lockage.
(iv) Entering locks. Masters of vessels shall exercise the greatest care when entering either lock. The forward movement of vessels while taking position in the locks shall be very slow, and boats entering the small lock shall reduce their speed to not more than two and one-half miles per hour when within 200 feet of the outer gate and come to practically a full stop before entering the lock so that in case the engine mechanism fails to operate properly the momentum of the boat may be stopped easily by its lines. The masters of vessels entering either lock from either direction shall be alert to receive and shall immediately comply with instructions by voice or signal from the lock attendants.
(v) Mooring in locks. Vessels entering the locks shall be equipped with adequate lines, at least 50 feet in length being required fore and aft. While in the large lock vessels and rafts will be moored at the top of the lock wall. While in the small lock vessels shall be moored to the floating mooring wall. Lines shall not be released until the signal has been given by the lock force to leave the lock, after which there shall be no delay in leaving. All vessels not equipped to handle tie-up lines with power winches shall be equipped with suitable mooring lines of manila, or other suitable fiber, of sufficient size and strength to hold the vessel against the currents to be met within the lock chamber. The use of wire rope for tie-up by vessels not equipped to handle such lines with power winches is prohibited. Vessels may be denied the use of the locks if their lines are not in good condition, or if the mooring bits on barges are not accessible or are not equipped to prevent lines from slipping off when the water is lowered in the lock. All vessels entering the locks should have, in addition to the master, at least one person on deck to handle lines. Mates and deckhands, when preparing to moor within the lock chambers, should not throw heavy mooring lines at the lockmen on the walls, but should wait for a heaving lie to be passed to them unless otherwise directed. All towboat crews, while locking or moving a tow out of the lock chamber, should station themselves so as to preclude the possibility of being injured by the parting of cable or lines under strain. Persons attempting to take vessels through the locks without assistance on deck may be required to wait until the lock is clear of other traffic before passing through. All operators of vessels are especially cautioned to use extreme care while crowded in the locks to avoid accident or fire on their boats. Under no circumstances will small craft, such as rowboats, launches and houseboats, or any other type of pleasure boats, be locked through with barges used for carrying any type of petroleum product or other hazardous material. At the discretion of the lockmaster, small craft as described above may be locked through with barge tows containing other than dangerous material. Operators of small vessels and larger vessels operating in the proximity of each other shall be alert to the danger arising from the limited maneuverability of the larger vessels, and shall exercise all precautions to prevent accident.
(6) Damage to locks or other structures. (i) The regulations in this paragraph shall not affect the liability of the owners and operators of vessels for any damage caused by their operations to the locks or other structures. The sides and corners of all vessels and rafts passing through the locks should be free from spikes or projections of any kind which might damage the locks or other structures. Vessels with appurtenances or projections which might damage the locks or other structures shall be fitted with adequate fenders. Lockage of leaking vessels or vessels with overhanging loads may be refused. Such barge or craft shall be moored in a location outside of the channel approach to the lock so as to not interfere with passing navigation. Vessels of unusual dimensions, or other characteristics which, in the opinion of the lockmaster, pose a threat to the integrity or safety of the locks or canal will be refused passage until written permission to pass is provided by the District Engineer. Sufficient written data and drawings shall be provided the District Engineer that an engineering determination can be made as to the safety of the vessel. The District Engineer shall have the right to inspect any such vessels prior to passage. The operators of all vessels shall use care to avoid striking the guide walls or other structures pertaining to the canal.
(ii) In the interest of safety and fire prevention, all woven rope fenders used with barges carrying flammable cargo should be water-soaked or otherwise fireproofed prior to entering the lock approaches.
(iii) Burning fenders should be dropped overboard immediately rather than being placed on the deck of a barge or towboat.
(iv) A minimum of one man with a portable fender shall be stationed at the head end of every tow of hazardous cargo and at the aft if the lockmaster so directs so as to protect the lock and guide walls from damage while entering or departing the lock structures.
(v) All cylinder or containers holding gases under pressure, or any other chemical or substance, shall be securely fastened to the hull of the vessel to prevent their rolling overboard into the lock chamber and becoming a hazard.
(vi) All containers holding paint, gasoline or other volatile materials shall be securely fastened with tight-fitting covers. To preclude a concentration of potentially explosive vapors, no paint will be allowed to be applied to the exterior of vessel hulls, houses, machinery, or other equipment while the vessels are in the lock chamber.
(vii) All hatches of tank barges must be closed prior to entering lock. Tank barges with open hatch or hatches will be denied lockage.
(viii) No smoking will be permitted aboard vessels with cargoes of fuel or explosives.
(ix) All vessels carrying hazardous cargoes shall so be identified with the lockmaster. They shall be in compliance with Department of Transportation (U.S. Coast Guard) regulations (CFR title 46, parts 30 thru 40, parts 146 thru 154, and 49 CFR parts 171 thru 179 and shall accordingly carry required markings. All DOT safety regulations for transit of hazardous cargoes shall be adhered to, whether or not specifically cited or duplicated herein.
(7) [Reserved]
(8) Rafts. (i) No log raft exceeding 700 feet in length or 76 feet in width shall pass through the canal. Boom sticks shall be smooth, with rounded ends, and securely tied together with cables, chains, or log swifters to prevent the raft from spreading while in the lock. Rafts containing logs that do not float above water for their entire length, or are in danger of being submerged when they enter fresh water, shall not be towed in the canal until such logs are securely fastened so as to prevent their escape from the raft.
(ii) Whenever required, log rafts passing in through the lock will be given a number that shall be fastened on one of the logs in the raft. This number will identify the raft and shall not be removed until the logs are used.
(iii) Two floats are maintained in Shilshole Bay near the entrance of the canal channel to facilitate the handling of logs in the canal. Rafts bound for the canal may be moored at one of these floats, only the portion of the raft that is to be taken through at a single lockage being brought into the canal. The remainder of the raft may be left at the float until the first portion has been towed to its destination above the lock.
(9) Tows. All vessels engaged in towing shall use tow lines of the least practicable length and shall have full control of their tows at all times. Towing more than one craft abreast is forbidden if the total width of the tow, including the towboat, exceeds 70 feet.
(10) Obstructing navigation. (i) All vessels and tows passing through the canal shall be kept as close as practicable to the center or, when safer, to the right side of the waterway, except when passing other craft or preparing to moor at a pier or wharf. Slowly moving log rafts, tows, or vessels shall, whenever practicable, pull out of the way when meeting other vessels or when other traffic proceeding in the same direction desires to pass. Vessels are forbidden to obstruct the canal in any way or to delay by slow passage through the canal the progress of other vessels. Small and readily maneuverable vessels operating in the vicinity of larger, less maneuverable vessels shall, in all cases, keep clear and operate with caution in order that the larger vessels may maintain safe steerage way and that hazards to all vessels may be reduced. All vessels shall operate with extreme caution and movements shall be made only when adequate precautions for the safety of other vessels and property are being effectively employed.
(ii) The placing of logs, vessels, or other floating objects within the limits of the dredged channels or anywhere in the canal where they may interfere with navigation to or from piers or industrial plants is prohibited.
(11) Turning. Vessels exceeding 100 feet in length shall not turn around, or attempt to turn around, in the concrete revetted portions of the canal at the Fremont Cut or Portage Cut sections of the canal.
(12) Excessive working of propellers or engines. Excessive working of the propellers of a vessel for purposes of testing or for other purposes when this creates objectionable or dangerous currents in the canal is forbidden. In case of grounding, the rapid or strong working of the vessel's engines is forbidden.
(13) Landing or mooring. No business, trading, or landing of passengers, freight, or baggage will be allowed on or over the canal piers or lock walls, or over the piers or grounds forming a part of the canal or its appurtenances. All persons in charge of or employed on any boat are prohibited from landing or mooring such boat at any of the canal piers, unless in transit through the canal or specially permitted to do so by the District Engineer or his authorized assistants.
(14) Deposit of refuse. The deposit, either from watercraft or from the shore, of any oil or refuse matter in the canal or upon the canal grounds is prohibited, nor shall water discharged from the side of a vessel be allowed to spill on the lock wall.
(15) Aids to navigation. Persons in charge of log rafts or other tows, and the masters of vessels and boats using the canal, shall keep a careful watch when passing buoys or other aids to navigation and promptly report to the District Engineering or his authorized assistants any displacement or damage to such aids.
Note:
Aids to navigation and other related data are shown on Nautical Chart No. 18447 published by the National Ocean Survey.
(16) Operation of salt water barrier in the large lock of the Hiram M. Chittenden Locks. (i) A salt water barrier is installed across the east end of the large lock. This barrier, while in the depressed position, reduces the depth of the water available at the east end of this chamber from 36 feet to 33.75 feet at low lake elevation (20 feet above MLLW). In the raised position, the depth of water will be reduced to 16 feet. In comparison, the depth of water available for navigation at the west end of the large lock chamber is 29 feet at mean lower low water. The purpose of this barrier is to reduce salt water intrusion into Lake Washington through normal operations of the locks.
(ii) The least depth of water available over the barrier when raised will be shown on signs placed near the ends of the guide piers to the large lock. A yellow light mounted on these signs will be lighted only while the barrier is in a raised position.
(iii) Vessels transiting the lock from east to west having draft requirements that exceed the water depth available over the barrier will advise the lockmaster by sounding one long and two short blasts of a horn or whistle. When the yellow light is extinguished on the signboard, the operator of the vessel may assume the barrier has been lowered.
(iv) Vessels transiting the lock from west to east having draft requirements that exceed the depth available over the intrusion barrier will advise the lockmaster by sounding one long and two short blasts of a horn or whistle. A yellow light mounted on a standard on the south lock wall and opposite the intrusion barrier will be lighted only when the barrier is in the raised position.
(v) It shall be the responsibility of the vessel operator to satisfy himself of the position of this barrier prior to passing over it.
(c) West Waterway, Seattle Harbor; navigation. (1) The movement of vessels of 250 gross tons or over and all vessels with tows of any kind through the narrow section of West Waterway between the bend at Fisher's Flour Mill dock and the bend at the junction of East Waterway with Duwamish Waterway, and through the draws of the City of Seattle and Northern Pacific Railway Company bridges crossing this narrow section, shall be governed by red and green traffic signal lights mounted on the north and south sides of the west tower of the City Light power crossing at West Spokane Street.
(2) Two green lights, one vertically above the other, displayed ahead of a vessel, shall indicate that the waterway is clear. Two red lights, one vertically above the other, displayed ahead of a vessel, shall indicate that the waterway is not clear.
(3) A vessel approaching the narrow section and drawbridges from either end of the waterway shall give one long blast of a whistle and shall not enter the narrow section until green lights are displayed.
(4) One vessel may follow another vessel in either direction, but the channel shall not be kept open in the same direction for an unreasonable time if a vessel is waiting at the other end.
(5) Tugs, launches, and small craft shall keep close to one side of the channel when vessels or boats with tows are passing.
(6) All craft shall proceed with caution. The display of a green light is not a guarantee that the channel is clear of traffic, and neither the United States nor the City of Seattle will be responsible for any damage to vessels or other property which may be chargeable to mistakes in the operation of the signal lights or to their failure to operate.
[26 FR 11203, Nov. 28, 1961]
Editorial Note:For Federal Register citations affecting § 207.750, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
§ 207.800 Collection of navigation statistics.
(a) Definitions. For the purpose of this regulation the following terms are defined:
(1) Navigable waters of the United States means those waters of the United States that are subject to the ebb and flow of the tide shoreward to the mean high water mark, and/or are presently used, or have been used in the past, or may be susceptible to use to transport interstate or foreign commerce. (See 33 CFR part 329 for a more complete definition of this term.)
(2) Offenses and Violations mean:
(i) Failure to submit a required report.
(ii) Failure to provide a timely, accurate, and complete report.
(iii) Failure to submit monthly listings of idle vessels or vessels in transit.
(iv) Failure to submit a report required by the lockmaster or canal operator.
(3) Leased or chartered vessel means a vessel that is leased or chartered when the owner relinquishes control of the vessel through a contractual agreement with a second party for a specified period of time and/or for a specified remuneration from the lessee. Commercial movements on an affreightment basis are not considered a lease or charter of a particular vessel.
(4) Person or entity means an individual, corporation, partnership, or company.
(5) Timely means vessel and commodity movement data must be received by the Waterborne Commerce Statistics Center within 30 days after the close of the month in which the vessel movement or nonmovement takes place.
(6) Commercial vessel means a vessel used in transporting by water, either merchandise or passengers for compensation or hire, or in the course of business of the owner, lessee, or operator of the vessel.
(7) Reporting situation means a vessel movement by an operator that is required to be reported. Typical examples are listed in the instructions on the various ENG Forms. Five typical movements that are required to be reported by vessel operating companies include the following examples:
Company A is the barge owner, and the barge transports corn from Minneapolis, MN to New Orleans, LA, with fleeting at Cairo, IL.
(i) Lease/Charter: If Company A leases or charters the barge to Company B, then Company B is responsible for reporting the movements of the barge until the lease/charter expires.
(ii) Interline movement: A barge is towed from Minneapolis to Cairo by Company A, and from Cairo to New Orleans by Company B. Since Company A is the barge owner, and the barge is not leased. Company A reports the entire movement of the barge with an origin of Minneapolis and a destination of New Orleans.
(iii) Vessel swap/trade: Company A swaps barge with Company B to allow Company B to meet a delivery commitment to New Orleans. Since Company A has not leased/chartered the barge, Company A is responsible for filing the report. Company B is responsible for filing the report on the barge which is traded to Company A. The swap or trade will not affect the primary responsibility for reporting the individual vessel movements.
(iv) Re-Consignment: Barge is reconsigned to Mobile, AL. Company A reports the movements as originating in Minneapolis and terminating in Mobile. The point from which barge is reconsigned is not reported, only points of loading and unloading.
(v) Fleeting: Barge is deposited at a New Orleans fleeting area by Company A and towed by Company B from fleeting area to New Orleans area dock for unloading. Company A, as barge owner, reports entire movements from Minneapolis to the unloading dock in New Orleans. Company B does not report any barge movement.
(b) Implementation of the waterborne commerce statistics provisions of the River and Harbor Act of 1922, as amended by the Water Resources Development Act of 1986 (Pub. L. 99-662), mandates the following.
(1) Filing requirements. Except as provided in paragraph (b)(2) of this section, the person or entity receiving remuneration for the movement of vessels or for the transportation of goods or passengers on the navigable waters is responsible for assuring that the activity report of commercial vessels is timely filed.
(i) For vessels under lease/charter agreements, the lessee or charterer of any commercial vessel engaged in commercial transportation will be responsible for the filing of said reports until the lease/charter expires.
(ii) The vessel owner, or his designated agent, is always the responsible party for ensuring that all commercial activity of the vessel is timely reported.
(2) The following Vessel Information Reports are to be filed with the Army Corps of Engineers, at the address specified on the ENG Form, and are to include:
(i) Monthly reports. These reports shall be made on ENG Forms furnished upon written request of the vessel operating companies to the Army Corps of Engineers. The forms are available at the following address: U.S. Army Corps of Engineers, Waterborne Commerce Statistics Center, Post Office Box 61280, New Orleans, Louisiana 70161-1280.
(A) All movements of domestic waterborne commercial vessels shall be reported, including but not limited to: Dry cargo ship and tanker moves, loaded and empty barge moves, towboat moves, with or without barges in tow, fishing vessels, movements of crew boats and supply boats to offshore locations, tugboat moves and movements of newly constructed vessels from the shipyard to the point of delivery.
(B) Vessels idle during the month must also be reported.
(C) Notwithstanding the above requirements, the following waterborne vessel movements need not be reported:
(1) Movements of recreational vessels.
(2) Movements of fire, police, and patrol vessels.
(3) Movements of vessels exclusively engaged in construction (e.g., piledrivers and crane barges). Note: however, that movements of supplies, materials, and crews to or from the construction site must be timely reported.
(4) Movements of dredges to or from the dredging site. However, vessel movements of dredged material from the dredging site to the disposal site must be reported.
(5) Specific movements granted exemption in writing by the Waterborne Commerce Statistics Center.
(D) ENG Forms 3925 and 3925b shall be completed and filed by vessel operating companies each month for all voyages or vessel movements completed during the month. Vessels that did not complete a move during the month shall be reported as idle or in transit.
(E) The vessel operating company may request a waiver from the Army Corps of Engineers, and upon written approval by the Waterborne Commerce Center, the company may be allowed to provide the requisite information of the above paragraph (D), on computer printouts, magnetic tape, diskettes, or alternate medium approved by the Center.
(F) Harbor Maintenance Tax information is required on ENG Form 3925 for cargo movements into or out of ports that are subject to the provisions of section 1402 of the Water Resources Development Act of 1986 (Pub. L. 99-662).
(1) The name of the shipper of the commodity, and the shipper's Internal Revenue Service number or Social Security number, must be reported on the form.
(2) If a specific exemption applies to the shipper, the shipper should list the appropriate exemption code. The specific exemption codes are listed in the directions for ENG Form 3925.
(3) Refer to 19 CFR part 24 for detailed information on exemptions and ports subject to the Harbor Maintenance Tax.
(ii) Annual reports. Annually an inventory of vessels available for commercial carriage of domestic commerce and vessel characteristics must be filed on ENG Forms 3931 and 3932.
(iii) Transaction reports. The sale, charter, or lease of vessels to other companies must also be reported to assure that proper decisions are made regarding each company's duty for reporting vessel movements during the year. In the absence of notification of the transaction, the former company of record remains responsible until proper notice is received by the Corps.
(iv) Reports to lockmasters and canal operators. Masters of self-propelled non-recreational vessels which pass through locks and canals operated by the Army Corps of Engineers will provide the data specified on ENG Forms 3102b, 3102c, and/or 3102d to the lockmaster, canal operator, or his designated representative in the manner and detail dictated.
(c) Penalties for noncompliance. The following penalties for noncompliance can be assessed for offenses and violations.
(1) Criminal penalties. Every person or persons violating the provisions of this regulation shall, for each and every offenses, be liable to a fine of not more than $5,000, or imprisonment not exceeding two months, to be enforced in any district court in the United States within whose territorial jurisdiction such offense may have been committed.
(2) In addition, any person or entity that fails to provide timely, accurate, and complete statements or reports required to be submitted by the regulation in this section may also be assessed a civil penalty of up to $7,156 per violation under 33 U.S.C. 555, as amended.
(3) Denial of passage. In addition to these fines, penalties, and imprisonments, the lockmaster or canal operator can refuse to allow vessel passage.
(d) Enforcement policy. Every means at the disposal of the Army Corps of Engineers will be utilized to monitor and enforce these regulations.
(1) To identify vessel operating companies that should be reporting waterborne commerce data, The Corps will make use of, but is not limited to, the following sources.
(i) Data on purchase and sale of vessels.
(ii) U.S. Coast Guard vessel documentation and reports.
(iii) Data collected at Locks, Canals, and other facilities operated by the Corps.
(iv) Data provided by terminals on ENG Form 3926.
(v) Data provided by the other Federal agencies including the Internal Revenue Service, Customs Service, Maritime Administration, Department of Transportation, and Department of Commerce.
(vi) Data provided by ports, local facilities, and State or local governments.
(vii) Data from trade journals and publications.
(viii) Site visits and inspections.
(2) Notice of violation. Once a reporting violation is determined to have occurred, the Chief of the Waterborne Commerce Statistics Center will notify the responsible party and allow 30 days for the reports to be filed after the fact. If the reports are not filed within this 30-day notice period, then appropriate civil or criminal actions will be undertaken by the Army Corps of Engineers, including the proposal of civil or criminal penalties for noncompliance. Typical cases for criminal or civil action include, but are not limited to, those violations which are willful, repeated, or have a substantial impact in the opinion of the Chief of the Waterborne Commerce Statistics Center.
(3) Administrative assessment of civil penalties. Civil penalties may be assessed in the following manner.
(i) Authorization. If the Chief of the Waterborne Commerce Statistics Center finds that a person or entity has failed to comply with any of the provisions specified herein, he is authorized to assess a civil penalty in accordance with the Class I penalty provisions of 33 CFR part 326. Provided, however, that the procedures in 33 CFR part 326 specifically implementing the Clean Water Act (33 U.S.C. 1319(g)(4)), public notice, comment period, and state coordination, shall not apply.
(ii) Initiation. The Chief of the Waterborne Commerce Statistics Center will prepare and process a proposed civil penalty order which shall state the amount of the penalty to be assessed, describe by reasonable specificity the nature of the violation, and indicate the applicable provisions of 33 CFR part 326.
(iii) Hearing requests. Recipients of a proposed civil penalty order may file a written request for a hearing or other proceeding. This request shall be as specified in 33 CFR part 326 and shall be addressed to the Director of the Water Resources Support Center, Casey Building, Fort Belvoir, Virginia 22060-5586, who will provide the requesting person or entity with a reasonable opportunity to present evidence regarding the issuance, modification, or revocation of the proposed order. Thereafter, the Director of the Water Resources Center shall issue a final order.
(4) Additional remedies. Appropriate cases may also be referred to the local U.S. Attorney for prosecution, penalty collection, injunctive, and other relief by the Chief of the Waterborne Commerce Statistics Center.
[56 FR 13765, Apr. 4, 1991, as amended at 84 FR 31497, July 2, 2019; 85 FR 35005, June 8, 2020; 86 FR 37248, July 15, 2021; 87 FR 62989, Oct. 18, 2022; 88 FR 51236, Aug. 3, 2023; 89 FR 47865, June 4, 2024; 90 FR 38405, Aug. 8, 2025]
PART 208 FLOOD CONTROL REGULATIONS
Authority: Sec. 7, 58 Stat. 890; 33 U.S.C. 709.
§ 208.10 Local flood protection works; maintenance and operation of structures and facilities.
(a) General. (1) The structures and facilities constructed by the United States for local flood protection shall be continuously maintained in such a manner and operated at such times and for such periods as may be necessary to obtain the maximum benefits.
(2) The State, political subdivision thereof, or other responsible local agency, which furnished assurance that it will maintain and operate flood control works in accordance with regulations prescribed by the Secretary of the Army, as required by law, shall appoint a permanent committee consisting of or headed by an official hereinafter called the “Superintendent,” who shall be responsible for the development and maintenance of, and directly in charge of, an organization responsible for the efficient operation and maintenance of all of the structures and facilities during flood periods and for continuous inspection and maintenance of the project works during periods of low water, all without cost to the United States.
(3) A reserve supply of materials needed during a flood emergency shall be kept on hand at all times.
(4) No encroachment or trespass which will adversely affect the efficient operation or maintenance of the project works shall be permitted upon the rights-of-way for the protective facilities.
(5) No improvement shall be passed over, under, or through the walls, levees, improved channels or floodways, nor shall any excavation or construction be permitted within the limits of the project right-of-way, nor shall any change be made in any feature of the works without prior determination by the District Engineer of the Department of the Army or his authorized representative that such improvement, excavation, construction, or alteration will not adversely affect the functioning of the protective facilities. Such improvements or alterations as may be found to be desirable and permissible under the above determination shall be constructed in accordance with standard engineering practice. Advice regarding the effect of proposed improvements or alterations on the functioning of the project and information concerning methods of construction acceptable under standard engineering practice shall be obtained from the District Engineer or, if otherwise obtained, shall be submitted for his approval. Drawings or prints showing such improvements or alterations as finally constructed shall be furnished the District Engineer after completion of the work.
(6) It shall be the duty of the superintendent to submit a semiannual report to the District Engineer covering inspection, maintenance, and operation of the protective works.
(7) The District Engineer or his authorized representatives shall have access at all times to all portions of the protective works.
(8) Maintenance measures or repairs which the District Engineer deems necessary shall be promptly taken or made.
(9) Appropriate measures shall be taken by local authorities to insure that the activities of all local organizations operating public or private facilities connected with the protective works are coordinated with those of the Superintendent's organization during flood periods.
(10) The Department of the Army will furnish local interests with an Operation and Maintenance Manual for each completed project, or separate useful part thereof, to assist them in carrying out their obligations under this part.
(b) Levees—(1) Maintenance. The Superintendent shall provide at all times such maintenance as may be required to insure serviceability of the structures in time of flood. Measures shall be taken to promote the growth of sod, exterminate burrowing animals, and to provide for routine mowing of the grass and weeds, removal of wild growth and drift deposits, and repair of damage caused by erosion or other forces. Where practicable, measures shall be taken to retard bank erosion by planting of willows or other suitable growth on areas riverward of the levees. Periodic inspections shall be made by the Superintendent to insure that the above maintenance measures are being effectively carried out and, further, to be certain that:
(i) No unusual settlement, sloughing, or material loss of grade or levee cross section has taken place;
(ii) No caving has occurred on either the land side or the river side of the levee which might affect the stability of the levee section;
(iii) No seepage, saturated areas, or sand boils are occurring;
(iv) Toe drainage systems and pressure relief wells are in good working condition, and that such facilities are not becoming clogged;
(v) Drains through the levees and gates on said drains are in good working condition;
(vi) No revetment work or riprap has been displaced, washed out, or removed;
(vii) No action is being taken, such as burning grass and weeds during inappropriate seasons, which will retard or destroy the growth of sod;
(viii) Access roads to and on the levee are being properly maintained;
(ix) Cattle guards and gates are in good condition;
(x) Crown of levee is shaped so as to drain readily, and roadway thereon, if any, is well shaped and maintained;
(xi) There is no unauthorized grazing or vehicular traffic on the levees;
(xii) Encroachments are not being made on the levee right-of-way which might endanger the structure or hinder its proper and efficient functioning during times of emergency.
Such inspections shall be made immediately prior to the beginning of the flood season; immediately following each major high water period, and otherwise at intervals not exceeding 90 days, and such intermediate times as may be necessary to insure the best possible care of the levee. Immediate steps will be taken to correct dangerous conditions disclosed by such inspections. Regular maintenance repair measures shall be accomplished during the appropriate season as scheduled by the Superintendent.
(2) Operation. During flood periods the levee shall be patrolled continuously to locate possible sand boils or unusual wetness of the landward slope and to be certain that:
(i) There are no indications of slides or sloughs developing;
(ii) Wave wash or scouring action is not occurring;
(iii) No low reaches of leave exist which may be overtopped;
(iv) No other conditions exist which might endanger the structure.
Appropriate advance measures will be taken to insure the availability of adequate labor and materials to meet all contingencies. Immediate steps will be taken to control any condition which endangers the levee and to repair the damaged section.
(c) Flood walls—(1) Maintenance. Periodic inspections shall be made by the Superintendent to be certain that:
(i) No seepage, saturated areas, or sand boils are occurring;
(ii) No undue settlement has occurred which affects the stability of the wall or its water tightness;
(iii) No trees exist, the roots of which might extend under the wall and offer accelerated seepage paths;
(iv) The concrete has not undergone cracking, chipping, or breaking to an extent which might affect the stability of the wall or its water tightness;
(v) There are no encroachments upon the right-of-way which might endanger the structure or hinder its functioning in time of flood;
(vi) Care is being exercised to prevent accumulation of trash and debris adjacent to walls, and to insure that no fires are being built near them;
(vii) No bank caving conditions exist riverward of the wall which might endanger its stability;
(viii) Toe drainage systems and pressure relief wells are in good working condition, and that such facilities are not becoming clogged.
Such inspections shall be made immediately prior to the beginning of the flood season, immediately following each major high water period, and otherwise at intervals not exceeding 90 days. Measures to eliminate encroachments and effect repairs found necessary by such inspections shall be undertaken immediately. All repairs shall be accomplished by methods acceptable in standard engineering practice.
(2) Operation. Continuous patrol of the wall shall be maintained during flood periods to locate possible leakage at monolith joints or seepage underneath the wall. Floating plant or boats will not be allowed to lie against or tie up to the wall. Should it become necessary during a flood emergency to pass anchor cables over the wall, adequate measures shall be taken to protect the concrete and construction joints. Immediate steps shall be taken to correct any condition which endangers the stability of the wall.
(d) Drainage structures—(1) Maintenance. Adequate measures shall be taken to insure that inlet and outlet channels are kept open and that trash, drift, or debris is not allowed to accumulate near drainage structures. Flap gates and manually operated gates and valves on drainage structures shall be examined, oiled, and trial operated at least once every 90 days. Where drainage structures are provided with stop log or other emergency closures, the condition of the equipment and its housing shall be inspected regularly and a trial installation of the emergency closure shall be made at least once each year. Periodic inspections shall be made by the Superintendent to be certain that:
(i) Pipes, gates, operating mechanism, riprap, and headwalls are in good condition;
(ii) Inlet and outlet channels are open;
(iii) Care is being exercised to prevent the accumulation of trash and debris near the structures and that no fires are being built near bituminous coated pipes;
(iv) Erosion is not occurring adjacent to the structure which might endanger its water tightness or stability.
Immediate steps will be taken to repair damage, replace missing or broken parts, or remedy adverse conditions disclosed by such inspections.
(2) Operation. Whenever high water conditions impend, all gates will be inspected a short time before water reaches the invert of the pipe and any object which might prevent closure of the gate shall be removed. Automatic gates shall be closely observed until it has been ascertained that they are securely closed. Manually operated gates and valves shall be closed as necessary to prevent inflow of flood water. All drainage structures in levees shall be inspected frequently during floods to ascertain whether seepage is taking place along the lines of their contact with the embankment. Immediate steps shall be taken to correct any adverse condition.
(e) Closure structures—(1) Maintenance. Closure structures for traffic openings shall be inspected by the Superintendent every 90 days to be certain that:
(i) No parts are missing;
(ii) Metal parts are adequately covered with paint;
(iii) All movable parts are in satisfactory working order;
(iv) Proper closure can be made promptly when necessary;
(v) Sufficient materials are on hand for the erection of sand bag closures and that the location of such materials will be readily accessible in times of emergency.
Tools and parts shall not be removed for other use. Trial erections of one or more closure structures shall be made once each year, alternating the structures chosen so that each gate will be erected at least once in each 3-year period. Trial erection of all closure structures shall be made whenever a change is made in key operating personnel. Where railroad operation makes trial erection of a closure structure infeasible, rigorous inspection and drill of operating personnel may be substituted therefor. Trial erection of sand bag closures is not required. Closure materials will be carefully checked prior to and following flood periods, and damaged or missing parts shall be repaired or replaced immediately.
(2) Operation. Erection of each movable closure shall be started in sufficient time to permit completion before flood waters reach the top of the structure sill. Information regarding the proper method of erecting each individual closure structure, together with an estimate of the time required by an experienced crew to complete its erection will be given in the Operation and Maintenance Manual which will be furnished local interests upon completion of the project. Closure structures will be inspected frequently during flood periods to ascertain that no undue leakage is occurring and that drains provided to care for ordinary leakage are functioning properly. Boats or floating plant shall not be allowed to tie up to closure structures or to discharge passengers or cargo over them.
(f) Pumping plants—(1) Maintenance. Pumping plants shall be inspected by the Superintendent at intervals not to exceed 30 days during flood seasons and 90 days during off-flood seasons to insure that all equipment is in order for instant use. At regular intervals, proper measures shall be taken to provide for cleaning plant, buildings, and equipment, repainting as necessary, and lubricating all machinery. Adequate supplies of lubricants for all types of machines, fuel for gasoline or diesel powered equipment, and flash lights or lanterns for emergency lighting shall be kept on hand at all times. Telephone service shall be maintained at pumping plants. All equipment, including switch gear, transformers, motors, pumps, valves, and gates shall be trial operated and checked at least once every 90 days. Megger tests of all insulation shall be made whenever wiring has been subjected to undue dampness and otherwise at intervals not to exceed one year. A record shall be kept showing the results of such tests. Wiring disclosed to be in an unsatisfactory condition by such tests shall be brought to a satisfactory condition or shall be promptly replaced. Diesel and gasoline engines shall be started at such intervals and allowed to run for such length of time as may be necessary to insure their serviceability in times of emergency. Only skilled electricians and mechanics shall be employed on tests and repairs. Operating personnel for the plant shall be present during tests. Any equipment removed from the station for repair or replacement shall be returned or replaced as soon as practicable and shall be trial operated after reinstallation. Repairs requiring removal of equipment from the plant shall be made during off-flood seasons insofar as practicable.
(2) Operation. Competent operators shall be on duty at pumping plants whenever it appears that necessity for pump operation is imminent. The operator shall thoroughly inspect, trial operate, and place in readiness all plant equipment. The operator shall be familiar with the equipment manufacturers' instructions and drawings and with the “Operating Instructions” for each station. The equipment shall be operated in accordance with the above-mentioned “Operating Instructions” and care shall be exercised that proper lubrication is being supplied all equipment, and that no overheating, undue vibration or noise is occurring. Immediately upon final recession of flood waters, the pumping station shall be thoroughly cleaned, pump house sumps flushed, and equipment thoroughly inspected, oiled and greased. A record or log of pumping plant operation shall be kept for each station, a copy of which shall be furnished the District Engineer following each flood.
(g) Channels and floodways—(1) Maintenance. Periodic inspections of improved channels and floodways shall be made by the Superintendent to be certain that:
(i) The channel or floodway is clear of debris, weeds, and wild growth;
(ii) The channel or floodway is not being restricted by the depositing of waste materials, building of unauthorized structures or other encroachments;
(iii) The capacity of the channel or floodway is not being reduced by the formation of shoals;
(iv) Banks are not being damaged by rain or wave wash, and that no sloughing of banks has occurred;
(v) Riprap sections and deflection dikes and walls are in good condition;
(vi) Approach and egress channels adjacent to the improved channel or floodway are sufficiently clear of obstructions and debris to permit proper functioning of the project works.
Such inspections shall be made prior to the beginning of the flood season and otherwise at intervals not to exceed 90 days. Immediate steps will be taken to remedy any adverse conditions disclosed by such inspections. Measures will be taken by the Superintendent to promote the growth of grass on bank slopes and earth deflection dikes. The Superintendent shall provide for periodic repair and cleaning of debris basins, check dams, and related structures as may be necessary.
(2) Operation. Both banks of the channel shall be patrolled during periods of high water, and measures shall be taken to protect those reaches being attacked by the current or by wave wash. Appropriate measures shall be taken to prevent the formation of jams of ice or debris. Large objects which become lodged against the bank shall be removed. The improved channel or floodway shall be thoroughly inspected immediately following each major high water period. As soon as practicable thereafter, all snags and other debris shall be removed and all damage to banks, riprap, deflection dikes and walls, drainage outlets, or other flood control structures repaired.
(h) Miscellaneous facilities—(1) Maintenance. Miscellaneous structures and facilities constructed as a part of the protective works and other structures and facilities which function as a part of, or affect the efficient functioning of the protective works, shall be periodically inspected by the Superintendent and appropriate maintenance measures taken. Damaged or unserviceable parts shall be repaired or replaced without delay. Areas used for ponding in connection with pumping plants or for temporary storage of interior run-off during flood periods shall not be allowed to become filled with silt, debris, or dumped material. The Superintendent shall take proper steps to prevent restriction of bridge openings and, where practicable, shall provide for temporary raising during floods of bridges which restrict channel capacities during high flows.
(2) Operation. Miscellaneous facilities shall be operated to prevent or reduce flooding during periods of high water. Those facilities constructed as a part of the protective works shall not be used for purposes other than flood protection without approval of the District Engineer unless designed therefor.
(Sec. 3, 49 Stat. 1571, as amended; 33 U.S.C. 701c)
[9 FR 9999, Aug. 17, 1944; 9 FR 10203, Aug. 22, 1944]
§ 208.11 Regulations for use of storage allocated for flood control or navigation and/or project operation at reservoirs subject to prescription of rules and regulations by the Secretary of the Army in the interest of flood control and navigation.
(a) Purpose. This regulation prescribes the responsibilities and general procedures for regulating reservoir projects capable of regulation for flood control or navigation and the use of storage allocated for such purposes and provided on the basis of flood control and navigation, except projects owned and operated by the Corps of Engineers; the International Boundary and Water Commission, United States and Mexico; and those under the jurisdiction of the International Joint Commission, United States, and Canada, and the Columbia River Treaty. The intent of this regulation is to establish an understanding between project owners, operating agencies, and the Corps of Engineers.
(b) Responsibilities. The basic responsibilities of the Corps of Engineers regarding project operation are set out in the cited authority and described in the following paragraphs:
(1) Section 7 of the Flood Control Act of 1944 (58 Stat. 890, 33 U.S.C. 709) directs the Secretary of the Army to prescribe regulations for flood control and navigation in the following manner:
Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or in part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be in accordance with such regulations: Provided, That this section shall not apply to the Tennessee Valley Authority, except that in case of danger from floods on the lower Ohio and Mississippi Rivers the Tennessee Valley Authority is directed to regulate the release of water from the Tennessee River into the Ohio River in accordance with such instructions as may be issued by the War Department.
(2) Section 9 of Public Law 436-83d Congress (68 Stat. 303) provides for the development of the Coosa River, Alabama and Georgia, and directs the Secretary of the Army to prescribe rules and regulations for project operation in the interest of flood control and navigation as follows:
The operation and maintenance of the dams shall be subject to reasonable rules and regulations of the Secretary of the Army in the interest of flood control and navigation.
Note:
This Regulation will also be applicable to dam and reservoir projects operated under provisions of future legislative acts wherein the Secretary of the Army is directed to prescribe rules and regulations in the interest of flood control and navigation. The Chief of Engineers, U.S. Army Corps of Engineers, is designated the duly authorized representative of the Secretary of the Army to exercise the authority set out in the Congressional Acts. This Regulation will normally be implemented by letters of understanding between the Corps of Engineers and project owner and will incorporate the provisions of such letters of understanding prior to the time construction renders the project capable of significant impoundment of water. A water control agreement signed by both parties will follow when deliberate impoundment first begins or at such time as the responsibilities of any Corps-owned projects may be transferred to another entity. Promulgation of this Regulation for a given project will occur at such time as the name of the project appears in the Federal Register in accordance with the requirements of paragraph 6k. When agreement on a water control plan cannot be reached between the Corps and the project owner after coordination with all interested parties, the project name will be entered in the Federal Register and the Corps of Engineers plan will be the official water control plan until such time as differences can be resolved.
(3) Federal Energy Regulatory Commission (FERC), formerly Federal Power Commission (FPC), Licenses.
(i) Responsibilities of the Secretary of the Army and/or the Chief of Engineers in FERC licensing actions are set forth in reference 3c above and pertinent sections are cited herein. The Commission may further stipulate as a licensing condition, that a licensee enter into an agreement with the Department of the Army providing for operation of the project during flood times, in accordance with rules and regulations prescribed by the Secretary of the Army.
(A) Section 4(e) of the Federal Power Act requires approval by the Chief of Engineers and the Secretary of the Army of plans of dams or other structures affecting the navigable capacity of any navigable waters of the United States, prior to issuance of a license by the Commission as follows:
The Commission is hereby authorized and empowered to issue licenses to citizens * * * for the purpose of constructing, operating and maintaining dams, water conduits, reservoirs, powerhouses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from or in any of the streams or other bodies of water over which Congress has jurisdiction * * * Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting navigation have been approved by the Chief of Engineers and the Secretary of the Army.
(B) Sections 10(a) and 10(c) of the Federal Power Act specify conditions of project licenses including the following:
(1) Section 10(a). “That the project adopted * * * shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of waterpower development, and for other beneficial public uses * * *.”
(2) Section 10(c). “That the licensee shall * * * so maintain and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property * * *.”
(C) Section 18 of the Federal Power Act directs the operation of any navigation facilities built under the provision of that Act, be controlled by rules and regulations prescribed by the Secretary of the Army as follows:
The operation of any navigation facilities which may be constructed as part of or in connection with any dam or diversion structure built under the provisions of this Act, whether at the expense of a licensee hereunder or of the United States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation; including the control of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of the Army, * * *.
(ii) Federal Power Commission Order No. 540 issued October 31, 1975, and published November 7, 1975 (40 FR 51998), amending § 2.9 of the Commission's General Policy and Interpretations prescribed Standardized Conditions (Forms) for Inclusion in Preliminary Permits and Licenses Issued Under part I of the Federal Power Act. As an example, Article 12 of Standard Form L-3, titled: “Terms and Conditions of License for Constructed Major Projects Affecting Navigable Waters of the United States,” sets forth the Commission's interpretation of appropriate sections of the Act, which deal with navigation aspects, and attendant responsibilities of the Secretary of the Army in licensing actions as follows:
The United States specifically retains and safeguards the right to use water in such amount, to be determined by the Secretary of the Army, as may be necessary for the purposes of navigation on the navigable waterway affected; and the operations of the Licensee, so far as they affect the use, storage and discharge from storage of waters affected by the license, shall at all times be controlled by such reasonable rules and regulations as the Secretary of the Army may prescribe in the interest of navigation, and as the Commission may prescribe for the protection of life, health, and property, * * * and the Licensee shall release water from the project reservoir at such rate * * * as the Secretary of the Army may prescribe in the interest of navigation, or as the Commission may prescribe for the other purposes hereinbefore mentioned.
(c) Scope and terminology. This regulation applies to Federal authorized flood control and/or navigation storage projects, and to non-Federal projects which require the Secretary of the Army to prescribe regulations as a condition of the license, permit or legislation, during the planning, design and construction phases, and throughout the life of the project. In compliance with the authority cited above, this regulation defines certain activities and responsibilities concerning water control management throughout the Nation in the interest of flood control and navigation. In carrying out the conditions of this regulation, the owner and/or operating agency will comply with applicable provisions of Pub. L. 85-624, the Fish and Wildlife Coordination Act of 1958, and Pub. L. 92-500, the Federal Water Pollution Control Act Amendments of 1972. This regulation does not apply to local flood protection works governed by § 208.10, or to navigation facilities and associated structures which are otherwise covered by part 207 (Navigation Regulations) of title 33 of the code. Small reservoirs, containing less than 12,500 acre-feet of flood control or navigation storage, may be excluded from this regulation and covered under § 208.10, unless specifically required by law or conditions of the license or permit.
(1) The terms reservoir and project as used herein include all water resource impoundment projects constructed or modified, including natural lakes, that are subject to this regulation.
(2) The term project owner refers to the entity responsible for maintenance, physical operation, and safety of the project, and for carrying out the water control plan in the interest of flood control and/or navigation as prescribed by the Corps of Engineers. Special arrangements may be made by the project owner for “operating agencies” to perform these tasks.
(3) The term letter of understanding as used herein includes statements which consummate this regulation for any given project and define the general provisions or conditions of the local sponsor, or owner, cooperation agreed to in the authorizing legislative document, and the requirements for compliance with section 7 of the 1944 Flood Control Act, the Federal Power Act or other special congressional act. This information will be specified in the water control plan and manual. The letter of understanding will be signed by a duly authorized representative of the Chief of Engineers and the project owner. A “field working agreement” may be substituted for a letter of understanding, provided that the specified minimum requirements of the latter, as stated above, are met.
(4) The term water control agreement refers to a compliation of water control criteria, guidelines, diagrams, release schedules, rule curves and specifications that basically govern the use of reservoir storage space allocated for flood control or navigation and/or release functions of a water control project for these purposes. In general, they indicate controlling or limiting rates of discharge and storage space required for flood control and/or navigation, based on the runoff potential during various seasons of the year.
(5) For the purpose of this regulation, the term water control plan is limited to the plan of regulation for a water resources project in the interest of flood control and/or navigation. The water control plan must conform with proposed allocations of storage capacity and downstream conditions or other requirements to meet all functional objectives of the particular project, acting separately or in combination with other projects in a system.
(6) The term real-time denotes the processing of current information or data in a sufficiently timely manner to influence a physical response in the system being monitored and controlled. As used herein the term connotes * * * the analyses for and execution of water control decisions for both minor and major flood events and for navigation, based on prevailing hydrometeorological and other conditions and constraints, to achieve efficient management of water resource systems.
(d) Procedures—(1) Conditions during project formulation. During the planning and design phases, the project owner should consult with the Corps of Engineers regarding the quantity and value of space to reserve in the reservoir for flood control and/or navigation purposes, and for utilization of the space, and other requirements of the license, permit or conditions of the law. Relevant matters that bear upon flood control and navigation accomplishment include: Runoff potential, reservoir discharge capability, downstream channel characteristics, hydrometeorological data collection, flood hazard, flood damage characteristics, real estate acquisition for flowage requirements (fee and easement), and resources required to carry out the water control plan. Advice may also be sought on determination of and regulation for the probable maximum or other design flood under consideration by the project owner to establish the quantity of surcharge storage space, and freeboard elevation of top of dam or embankment for safety of the project.
(2) Corps of Engineers involvement. If the project owner is responsible for real-time implementation of the water control plan, consultation and assistance will be provided by the Corps of Engineers when appropriate and to the extent possible. During any emergency that affects flood control and/or navigation, the Corps of Engineers may temporarily prescribe regulation of flood control or navigation storage space on a day-to-day (real-time) basis without request of the project owner. Appropriate consideration will be given for other authorized project functions. Upon refusal of the project owner to comply with regulations prescribed by the Corps of Engineers, a letter will be sent to the project owner by the Chief of Engineers or his duly authorized representative describing the reason for the regulations prescribed, events that have transpired, and notification that the project owner is in violation of the Code of Federal Regulations. Should an impasse arise, in that the project owner or the designated operating entity persists in noncompliance with regulations prescribed by the Corps of Engineers, measures may be taken to assure compliance.
(3) Corps of Engineers implementation of real-time water control decisions. The Corps of Engineers may prescribe the continuing regulation of flood control storage space for any project subject to this regulation on a day-to-day (real-time) basis. When this is the case, consultation and assistance from the project owner to the extent possible will be expected. Special requests by the project owner, or appropriate operating entity, are preferred before the Corps of Engineers offers advice on real-time regulation during surcharge storage utilization.
(4) Water control plan and manual. Prior to project completion, water control managers from the Corps of Engineers will visit the project and the area served by the project to become familiar with the water control facilities, and to insure sound formulation of the water control plan. The formal plan of regulation for flood control and/or navigation, referred to herein as the water control plan, will be developed and documented in a water control manual prepared by the Corps of Engineers. Development of the manual will be coordinated with the project owner to obtain the necessary pertinent information, and to insure compatibility with other project purposes and with surcharge regulation. Major topics in the manual will include: Authorization and description of the project, hydrometeorology, data collection and communication networks, hydrologic forecasting, the water control plan, and water resource management functions, including responsibilities and coordination for water control decisionmaking. Special instructions to the dam tender or reservoir manager on data collection, reporting to higher Federal authority, and on procedures to be followed in the event of a communication outage under emergency conditions, will be prepared as an exhibit in the manual. Other exhibits will include copies of this regulation, letters of understanding consummating this regulation, and the water control agreements. After approval by the Chief of Engineers or his duly authorized representative, the manual will be furnished the project owner.
(5) Water control agreement. (i) A water control diagram (graphical) will be prepared by the Corps of Engineers for each project having variable space reservation for flood control and/or navigation during the year; e.g., variable seasonal storage, joint-use space, or other rule curve designation. Reservoir inflow parameters will be included on the diagrams when appropriate. Concise notes will be included on the diagrams prescribing the use of storage space in terms of release schedules, runoff, nondamaging or other controlling flow rates downstream of the damsite, and other major factors as appropriate. A water control release schedule will be prepared in tabular form for projects that do not have variable space reservation for flood control and/or navigation. The water control diagram or release schedule will be signed by a duly authorized representative of the Chief of Engineers, the project owner, and the designated operating agency, and will be used as the basis for carrying out this regulation. Each diagram or schedule will contain a reference to this regulation.
(ii) When deemed necessary by the Corps of Engineers, information given on the water control diagram or release schedule will be supplemented by appropriate text to assure mutual understanding on certain details or other important aspects of the water control plan not covered in this regulation, on the water control diagram or in the release schedule. This material will include clarification of any aspects that might otherwise result in unsatisfactory project performance in the interest of flood control and/or navigation. Supplementation of the agreement will be necessary for each project where the Corps of Engineers exercises the discretionary authority to prescribe the flood control regulation on a day-to-day (real-time) basis. The agreement will include delegation of the responsibility. The document should also cite, as appropriate, section 7 of the 1944 Flood Control Act, the Federal Power Act and/or other congressional legislation authorizing construction and/or directing operation of the project.
(iii) All flood control regulations published in the Federal Register under this section (part 208) of the code prior to the date of this publication which are listed in § 208.11(e) are hereby superseded.
(iv) Nothing in this regulation prohibits the promulgation of specific regulations for a project in compliance with the authorizing acts, when agreement on acceptable regulations cannot be reached between the Corps of Engineers and the owner.
(6) Hydrometeorological instrumentation. The project owner will provide instrumentation in the vicinity of the damsite and will provide communication equipment necessary to record and transmit hydrometeorological and reservoir data to all appropriate Federal authorities on a real-time basis unless there are extenuating circumstances or are otherwise provided for as a condition of the license or permit. For those projects where the owner retains responsibility for real-time implementation of the water control plan, the owner will also provide or arrange for the measurement and reporting of hydrometeorological parameters required within and adjacent to the watershed and downstream of the damsite, sufficient to regulate the project for flood control and/or navigation in an efficient manner. When data collection stations outside the immediate vicinity of the damsite are required, and funds for installation, observation, and maintenance are not available from other sources, the Corps of Engineers may agree to share the costs for such stations with the project owner. Availability of funds and urgency of data needs are factors which will be considered in reaching decisions on cost sharing.
(7) Project safety. The project owner is responsible for the safety of the dam and appurtenant facilities and for regulation of the project during surcharge storage utilization. Emphasis upon the safety of the dam is especially important in the event surcharge storage is utilized, which results when the total storage space reserved for flood control is exceeded. Any assistance provided by the Corps of Engineers concerning surcharge regulation is to be utilized at the discretion of the project owner, and does not relieve the owner of the responsibility for safety of the project.
(8) Notification of the general public. The Corps of Engineers and other interested Federal and State agencies, and the project owner will jointly sponsor public involvement activities, as appropriate, to fully apprise the general public of the water control plan. Public meetings or other effective means of notification and involvement will be held, with the initial meeting being conducted as early as practicable but not later than the time the project first becomes operational. Notice of the initial public meeting shall be published once a week for 3 consecutive weeks in one or more newspapers of general circulation published in each county covered by the water control plan. Such notice shall also be used when appropriate to inform the public of modifications in the water control plan. If no newspaper is published in a county, the notice shall be published in one or more newspapers of general circulation within that county. For the purposes of this section a newspaper is one qualified to publish public notices under applicable State law. Notice shall be given in the event significant problems are anticipated or experienced that will prevent carrying out the approved water control plan or in the event that an extreme water condition is expected that could produce severe damage to property or loss of life. The means for conveying this information shall be commensurate with the urgency of the situation. The water control manual will be made available for examination by the general public upon request at the appropriate office of the Corps of Engineers, project owner or designated operating agency.
(9) Other generalized requirements for flood control and navigation. (i) Storage space in the reservoirs allocated for flood control and navigation purposes shall be kept available for those purposes in accordance with the water control agreement, and the plan of regulation in the water control manual.
(ii) Any water impounded in the flood control space defined by the water control agreement shall be evacuated as rapidly as can be safely accomplished without causing downstream flows to exceed the controlling rates; i.e., releases from reservoirs shall be restricted insofar as practicable to quantities which, in conjunction with uncontrolled runoff downstream of the dam, will not cause water levels to exceed the controlling stages currently in force. Although conflicts may arise with other purposes, such as hydropower, the plan or regulation may require releases to be completely curtailed in the interest of flood control or safety of the project.
(iii) Nothing in the plan of regulation for flood control shall be construed to require or allow dangerously rapid changes in magnitudes of releases. Releases will be made in a manner consistent with requirements for protecting the dam and reservoir from major damage during passage of the maximum design flood for the project.
(iv) The project owner shall monitor current reservoir and hydro- meteorological conditions in and adjacent to the watershed and downstream of the damsite, as necessary. This and any other pertinent information shall be reported to the Corps of Engineers on a timely basis, in accordance with standing instructions to the damtender or other means requested by the Corps of Engineers.
(v) In all cases where the project owner retains responsibility for real-time implementation of the water control plan, he shall make current determinations of: Reservoir inflow, flood control storage utilized, and scheduled releases. He shall also determine storage space and releases required to comply with the water control plan prescribed by the Corps of Engineers. The owner shall report this information on a timely basis as requested by the Corps of Engineers.
(vi) The water control plan is subject to temporary modification by the Corps of Engineers if found necessary in time of emergency. Requests for and action on such modifications may be made by the fastest means of communication available. The action taken shall be confirmed in writing the same day to the project owner and shall include justification for the action.
(vii) The project owner may temporarily deviate from the water control plan in the event an immediate short-term departure is deemed necessary for emergency reasons to protect the safety of the dam, or to avoid other serious hazards. Such actions shall be immediately reported by the fastest means of communication available. Actions shall be confirmed in writing the same day to the Corps of Engineers and shall include justification for the action. Continuation of the deviation will require the express approval of the Chief of Engineers, or his duly authorized representative.
(viii) Advance approval of the Chief of Engineers, or his duly authorized representative, is required prior to any deviation from the plan of regulation prescribed or approved by the Corps of Engineers in the interest of flood control and/or navigation, except in emergency situations provided for in paragraph (d)(9)(vii) of this section. When conditions appear to warrant a prolonged deviation from the approved plan, the project owner and the Corps of Engineers will jointly investigate and evaluate the proposed deviation to insure that the overall integrity of the plan would not be unduly compromised. Approval of prolonged deviations will not be granted unless such investigations and evaluations have been conducted to the extent deemed necessary by the Chief of Engineers, or his designated representatives, to fully substantiate the deviation.
(10) Revisions. The water control plan and all associated documents will be revised by the Corps of Engineers as necessary, to reflect changed conditions that come to bear upon flood control and navigation, e.g., reallocation of reservoir storage space due to sedimentation or transfer of storage space to a neighboring project. Revision of the water control plan, water control agreement, water control diagram, or release schedule requires approval of the Chief of Engineers or his duly authorized representative. Each such revision shall be effective upon the date specified in the approval. The original (signed document) water control agreement shall be kept on file in the respective Office the Division Engineer, Corps of Engineers, Department of the Army, located at division offices throughout the continental USA. Copies of these agreements may be obtained from the office of the project owner, or from the office of the appropriate Division Engineer, Corps of Engineers.
(11) Federal Register. The following information for each project subject to section 7 of the 1944 Flood Control Act and other applicable congressional acts shall be published in the Federal Register prior to the time the projects becomes operational and prior to any significant impoundment before project completion or * * * at such time as the responsibility for physical operation and maintenance of the Corps of Engineers owned projects is transferred to another entity:
(i) Reservoir, dam, and lake names,
(ii) Stream, county, and State corresponding to the damsite location,
(iii) The maximum current storage space in acre-feet to be reserved exclusively for flood control and/or navigation purposes, or any multiple-use space (intermingled) when flood control or navigation is one of the purposes, with corresponding elevations in feet above mean sea level, and area in acres, at the upper and lower limits of said space,
(iv) The name of the project owner, and
(v) Congressional legislation authorizing the project for Federal participation.
(e) List of projects. The following tables, “Pertinent Project Data—Section 208.11 Regulation,” show the pertinent data for projects which are subject to this regulation.
List of Projects
[Non-Corps projects with Corps Regulation Requirements]
Project name 1 (1) | State (2) | County (3) | Stream 1 (4) | Project purpose 2 (5) | Storage 1000 AF (6) | Elev limits feet M.S.L. | Area in acres | Authorizing legis. 3 (11) | Proj. owner 4 (12)
Upper (7) | Lower (8) | Upper (9) | Lower (10)
Agency Valley Dam & Res | OR | Malheur | N Fork Malheur R | FICR | 60.0 | 3340.0 | 3263.0 | 1900 | 0 | PL 68-292 | USBR.
Alpine Dam | IL | Winnebago | Keith Cr | F | 0.6 | 796.0 | 760.0 | 52 | 0 | PWA Proj | Rkfd, IL.
Altus Dam & Res | OK | Jackson | N Fork Red R | F IMR | 19.6 132.6 | 1562.0 1559.0 | 1559.0 1517.5P | 6800 6260 | 6260 735 | PL 761 | USBR.
Anderson Ranch Dam & Res | ID | Elmore | S Fk Boise R | FEI | 423.2 | 4196.0 | 4039.6 | 4740 | 1150 | Act of 1939 53 Stat 1187 | USBR.
Arbuckle Dam & Res | OK | Murray | Rock Cr | F MRC | 36.4 62.5 | 885.3 872.0 | 872.0 827.0 | 3130 2350 | 2350 606 | PL 594 | USBR.
Arrowrock Dam & Res | ID | Elmore | Boise R | FI | 286.6 | 3216.0 | 2974.0 | 3100 | 200 | Act of 1902 32 Stat 388 | USBR.
Bear Cr Dam | MO | Marion Ralls | Bear Cr | F | 8.7 | 546.5 | 520.0 | 540 | 0 | PL 83-780 | Hnbl, MO.
Bear Swamp Fife Brook (Lo) | MA | Franklin | Deerfield R | E | 6.9 | 870.0 | 830.0 | 152 | 115 | FERC 2669 | NEPC.
Bear Swamp PS (Upper) | MA | Franklin | Deerfield R Trib | E | 8.9 | 1600.0 | 1550.0 | 118 | 102 | Fed Pwr Act | NEPC.
Bellows Falls Dam & Lk | VT | Cheshire | Connecticut R | E | 7.5 | 291.6 | 273.6 | 2804 | 836 | FERC 1885 | NEPC.
Big Dry Creek and Div | CA | Fresno | Big Dry Cr & Dog Cr | F | 16.2 | 425.0 | 393.0 | 1530 | 0 | PL 77-228 | Rclm, B CA.
Blue Mesa Dam & Res | CO | Gunnison | Gunnison R | FER | 748.5 | 7519.4 | 7393.0 | 9180 | 2790 | PL 84-485 | USBR
Boca Dam & Res | CA | Nevada | Little Truckee R | I FI | 32.8 8.0 | 5596.5 5605.0 | 5521.0 5596.0 | 873 980 | 52 873 | PL 61-289 PL 68-292 | USBR.
Bonny Dam & Res | CO | Yuma | S Fork Republic R | F ICR | 128.2 39.2 | 3710.0 3672.0 | 3672.0 3638.0 | 5036 2042 | 2042 331 | PL 78-534 PL 79-732 | USBR.
Boysen Dam & Res | WY | Fremont | Wild R | F FEIQ EIQ | 150.4 146.1 403.8 | 4732.2 4725.0 4717.0 | 4725.0 4717.0 4685.0 | 22170 19560 16960 | 19560 16960 9280 | PL 78-534 | USBR.
Brantley Dam & Res | NM | Eddy | Pecos R | FIRQ | 348.5 | 3283.0 | 3210.7 | 21294 | 38 | PL 92-515 | USBR.
Brownlee Dam & Res | OR ID | Baker Washington | Snake R | FE | 975.3 | 2077.0 | 1976.0 | 13840 | 6650 | FERC No 1971-C | ID Pwr.
Bully Cr Dam & Res | OR | Malheur | Bully Cr | FI | 31.6 | 2516.0 | 2456.8 | 1082 | 140 | PL 86-248 | USBR.
Camanche Dam & Res | CA | San Joaquin | Mokelumne R | FRIE RIE | 200.0 230.9 | 235.5 205.1 | 205.1 92.0 | 7600 5507 | 5507 0 | PL 86-645 | EB-MUD.
Canyon Ferry Dam & Lk | MT | Lewis Clark | Missouri R | F FEI EI | 99.5 795.1 711.5 | 3800.0 3797.0 3770.0 | 3797.0 3770.0 3728.0 | 33535 32800 24125 | 32800 24125 11480 | PL 78-534 | USBR.
Cedar Bluff Dam & Res | KS | Trego | Smoky Hill R | F IMCR | 191.9 149.8 | 2166.0 2144.0 | 2144.0 2107.8 | 10790 6869 | 6869 2086 | PL 78-534 | USBR.
Cheney Dam & Res | KS | Sedgwick | N Fork Ninnescah R | F MC | 80.9 151.8 0.0 | 1429.9 1421.6 0.0 | 1421.6 1392.9 0.0 | 12420 9540 0 | 9540 1970 0 | PL 86-787 | USBR.
Clark Canyon Dam & Res | MT | Beaverhead | Beaverhead R | F FI I | 79.1 50.4 126.1 | 5560.4 5546.1 5535.7 | 5546.1 5535.7 5470.6 | 5900 5160 4495 | 5160 4495 220 | PL 78-534 | USBR.
Del Valle Dam & Res | CA | Alameda | Alameda Cr | F FIM IMR | 37.0 1.0 29.0 | 745.0 703.1 702.2 | 703.1 702.2 635.0 | 1060 710 700 | 710 700 275 | PL 87-874 | DWR. CA.
Don Pedro Dam & Lk | CA | Tuolumne | Tuolumne R | FIER EIR | 340.0 1381.0 308.0 | 830.0 802.0 600.0 | 802.0 600.0 342.0 | 12900 11260 3520 | 11260 3520 29 | PL 78-534 | M&T. Irr.
East Canyon Dam & Res | UT | Morgan | East Canyon Cr | FEIM | 48.0 | 5705.5 | 5578.0 | 684 | 130 | PL 81-273 | USBR.
Echo Dam & Res | UT | Summit | Weber R | FEIM | 74.0 | 5560.0 | 5450.0 | 1455 | 0 | PL 81-83 | USBR.
Emigrant Dam & Res | OR | Jackson | Emigrant Cr | FIR | 39.0 | 2241.0 | 2131.5 | 801 | 80 | PL 83-606 | USBR.
Enders Dam & Res | NE | Chase | Frenchman Cr | F ICR | 30.0 34.5 | 3127.0 3112.3 | 3112.3 3082.4 | 2405 1707 | 1707 658 | PL 78-534 PL 84-505 | USBR.
Folsom Dam & Lk | CA | Sacramento | American R | FEIM EIM | 400.0 610.0 | 466.0 427.0 | 427.0 210.0 | 11450 9040 | 9040 0 | USBR.
Fort Cobb Dam & Res | OK | Caddo | Pond (Cobb) Cr | F IMCR | 63.7 78.3 | 1354.8 1342.0 | 1342.0 1300.0 | 5980 4100 | 4100 337 | PL 419 | USBR.
Foss Dam & Res | OK | Custer | Washita R | F IMRC | 180.6 243.8 | 1668.6 1652.0 | 1652.0 1597.2 | 13140 8800 | 8800 1360 | PL 419 | USBR.
Friant Dam & Millerton Lk | CA | Fresno | San Joaquin R | FEIM | 390.5 | 578.0 | 466.3 | 4850 | 2101 | PL 75-392 PL 76-868 | USBR.
Galesville Dam | OR | Douglas | Cow Cr | FEMCR | 42.2 | 1881.5 | 1780.0 | 760 | 150 | FERC No. 71 61001 | Dgls, CO.
Gaston Dam & Res | NC | Halifax Northampton | Roanoke R | FE | 63.0 | 203.0 | 200.0 | 22500 | 20300 | Fed Pwr Act | VA Pwr.
Glen Elder Dam & Waconda Lk | KS | Mitchel | Solomon R | F IM | 722.3 204.8 | 1488.3 1455.6 | 1455.6 1428.0 | 33682 12602 | 12602 3341 | PL 78-534 PL 79-526 | USBR.
Glendo Dam & Res | WY | Platte | N Platte R | F EIM | 271.9 454.3 | 4653.0 4635.0 | 4635.0 4570.0 | 17990 12370 | 12370 3130 | PL 78-534 | USBR.
Grand Coulee Dam & FDR Lk | WA | Okanogan Grant | Columbia R | FEI | 5185.5 | 1290.0 | 1208.0 | 82280 | 45592 | PL 89-561 | USBR.
H Neely Henry Dam & Res | AL | Calhoun St. Clair | Coosa R | FE | 49.7 | 508.0 | 502.5 | 11235 | 7632 | PL 83-436 | AL Pwr.
Harris Dam & Res | AL | Randolph | Tallapoosa R | FE | 215.0 | 793.0 | 785.0 | 10661 | 9012 | PL 89-789 | AL Pwr.
Heart Butte Dm & Lk Tschida | ND | Grant | Heart R | F IQ | 147.9 69.0 | 2094.5 2064.5 | 2064.5 2030.0 | 6580 3400 | 3400 810 | PL 78-534 | USBR.
Hells Canyon Dam & Res | OR ID | Wallowa Adams | Snake R | EN | 11.7 | 1688.0 | 1683.0 | 2380 | 2280 | FERC No 1971-A | ID Pwr.
Hoover Dam & Lk Mead | NV AZ | Clark Mohave | Colorado R | F FEIMCAR | 1500.0 15.8 | 1229.0 1219.6 | 1219.6 1083.0 | 162700 156500 | 156500 83500 | PL 70-642 | USBR.
Hungry Horse Dam & Res | MT | Flathead | S Fork Flathead R | FEI | 2982.0 | 3560.0 | 3336.0 | 23800 | 5400 | PL 78-329 | USBR.
Indian Valley Dam & Res | CA | Lake | N Fork Cache Cr | FIMR IMR | 40.0 260.0 | 1485.0 1474.0 | 1474.0 1334.0 | 3975 3734 | 3734 308 | PL 84-984 | Yolo FC&W.
Jamestown Dam & Res | ND | Stutsman | James R | F IQ | 185.4 28.1 | 1454.0 1429.8 | 1429.8 1400.0 | 13210 2090 | 2090 160 | PL 78-534 | USBR.
Jocassee Dam & Res | SC | Pickens | Keowee R | PRFC | 1160.0 | 1110.0 | 1080.0 | 7565 | 6815 | FERC 2503 | USBR Pwr.
Keowee Dam & Lk | SC | Pickens | Keowee R | FPMCAR | 392.0 | 800.0 | 775.0 | 18372 | 13072 | FERC 2503 | Duke Pwr.
Kerr Dam Flathead Lk | MT | Lake | Flathead R | FER | 1219.0 | 2893.0 | 2883.0 | 125560 | 120000 | FERC No 5 | MT Pwr.
Kerr Dam & Lk Hudson (Markham Ferry Project) | OK | Mayes | Grand Neosho R | F E | 244.2 48.6 | 636.0 619.0 | 619.0 599.0 | 18800 10900 | 10900 4500 | PL 76-476 | GRD Auth.
Keyhole Dam & Res | WY | Crook | Belle Fourche R | F IQ | 140.5 185.8 | 4111.5 4099.3 | 4099.3 4051.0 | 13730 9410 | 9410 820 | PL 78-534 | USBR.
Kirwin Dam & Res | KS | Phillips | N Fork Solomon R | F ICR | 215.1 89.6 | 1757.3 1729.2 | 1729.3 1697.0 | 10640 5080 | 5080 1010 | PL 78-534 PL 79-732; PL 79-526 | USBR.
Lake Kemp Dam & Res | TX | Wichita | Wichita R | F MI | 234.9 268.0 | 1156.0 1144.0 | 1144.0 1114.0 | 23830 15590 | 15590 3350 | SD 144 | WF&C. WID2.
Leesville Dam & Res | VA | Campbell Pttsylvnia | Roanoke R | EQ | 37.8 | 613.0 | 600.0 | 3235 | 2400 | Fed Pwr Act | Appl Pwr.
Lemon Dam & Res | CO | La Plata | Florida R | FIM | 39.0 | 8148.0 | 8023.0 | 622 | 62 | PL 84-485 | USBR.
Lewis M Smith Dam & Res | AL | Walker Culman | Sipsey Fork; Black Warrior R | F E | 280.6 394.3 | 522.0 510.0 | 510.0 488.0 | 25700 21200 | 21200 15097 | Fed Pwr Act | AL Pwr.
Little Wood | ID | Blain | Little Wood R | FI | 30.0 | 5237.3 | 5127.4 | 572 | 0 | PL 84-993 | USBR.
Logan Martin Dam & Res | AL | Talladega | Cossa R | F E | 245.3 67.0 | 477.0 465.0 | 465.0 460.0 | 26310 15263 | 15260 11887 | PL 83-436 | AL Pwr.
Los Banos Dam & Detention | CA | Merced | Los Banos Cr | R | 20.6 | 327.8 | 231.2 | 467 | 0 | USBR.
Los Banos Dam & Detention Res | CA | Merced | Los Banos Cr | F | 14.0 | 353.5 | 327.8 | 619 | 467 | PL 86-488 | USBR.
Lost Creek Dam & Res | UT | Morgan | Lost Cr | FEIM | 20.0 | 6005.0 | 5912.0 | 365 | 93 | PL 81-273 | USBR.
Lovewell Dam & Res | KS | Jewell | White Rock Cr | F ICR | 50.5 24.9 | 1595.3 1582.6 | 1582.6 1571.7 | 5025 2986 | 2986 1704 | PL 78-534 PL 79-732 | USBR.
Marshall Ford Dam & Res | TX | Travis | Colorado R | F NEIM | 779.8 810.5 | 714.0 681.0 | 681.0 618.0 | 29060 18955 | 18955 8050 | PL 73-392 PL 78-534 | LCRA
Mayfield Dam & Res | WA | Lewis | Cowlitz R | FER | 21.4 | 425.0 | 415.0 | 2250 | 2030 | FPC No 2016-A | Tac WN.
McGee Creek Dam & Res | OK | Atoka | McGee Cr | F MCR | 85.3 108.0 | 595.5 577.7 | 577.1 515.1 | 5540 3810 | 3810 370 | PL 94-423 | USBR.
Medicine Cr Dam Harry Strunk Lk | NE | Frontier | Medicine Cr | F ICR | 52.7 26.8 | 2386.2 2366.1 | 2366.1 2343.0 | 3483 1840 | 1840 701 | PL 78-534 PL 84-505 | USBR.
Mossyrock Dam Davisson Lk | WA | Lewis | Cowlitz R | FER | 1397.0 | 778.5 | 600.0 | 11830 | 4250 | FERC No 2016-B | Tac, WN
Mt Park Dam Tom Steed Res | OK | Kiowa | W Otter Cr | F MRC | 20.3 89.0 | 1414.0 1411.0 | 1411.0 1386.3 | 7130 6400 | 6400 1270 | PL 90-503 | USBR.
Navajo Dam & Res | NM | San Juan Rio Arriba | San Juan R | FEIRQ | 1036.1 | 6085.0 | 5990.0 | 15610 | 7400 | PL 84-485 | USBR.
New Bullards Bar Dam & Res | CA | Yuba | Yuba R | FEIMR EIMR | 170.0 790.9 | 1956.0 1918.3 | 1918.3 1447.5 | 4809 4225 | 4225 129 | PL 89-298 | YCWA.
New Exchequer Dam & Lk | CA | Tuolumne | Merced R | FEIR EIR IR | 400.0 451.6 171.0 | 867.0 799.7 660.0 | 799.7 660.0 467.0 | 7110 4849 1900 | 4849 1900 150 | PL 86-645 | Mrcd, Irr.
New Melones Dam & Lk | CA | Tuolumne Calaveras | Stanislaus R | FEIMR EIMR IMR | 450.0 1670.0 300.0 | 1088.0 1049.5 808.0 | 1049.5 808.0 540.0 | 12500 10900 3500 | 10900 3500 0 | PL 87-874 | USBR.
Northfield Mt (Up) PS | MA | Franklin | Connecticut | E | 14.0 | 965.0 | 938.0 | 196 | 134 | FERC 1889 | WMEC.
Norton Dam & Kieth Sebelius Lk | KS | Norton | Prairie Dog Cr | F IMRC | 98.8 30.7 | 2331.4 2304.3 | 2304.3 2280.4 | 5316 2181 | 2181 587 | PL 78-534 PL 79-526 PL 79-732 | USBR.
Ochoco Dam & Res | OR | Crook | Ochoco Cr | FICR | 52.5 | 3136.2 | 0.0 | 1130 | 130 | PL 84-992 | USBR.
Oroville Dam & Lk | CA | Butte | Feather R | FEIMAR EIMAR | 750.0 2788.0 | 900.0 848.5 | 848.5 210.0 | 15800 13346 | 13346 0 | PL 85-500 | CA.
Pactola Dam & Res | SD | Pennington | Rapid Cr | F IM | 43.1 55.0 | 4621.5 4580.2 | 4580.2 4456.1 | 1230 860 | 860 100 | PL 78-534 | USBR.
Palisades Dam & Res | ID | Bonneville | Snake R | FIE | 1202.0 | 5620.0 | 5452.0 | 16100 | 2170 | PL 81-864 | USBR.
Paonia Dam & Res | CO | Gunnision | Muddy Cr | FIR | 17.0 | 6447.5 | 6373.0 | 334 | 120 | PL 80-177 PL 84-485 | USBR.
Pensacola Dam Grand Lake O' the Cherokees | OK | Mayes | Grand (Neosho) R | F E | 525.0 1192.0 | 755.0 745.0 | 745.0 705.0 | 59200 46500 | 46500 17000 | PL 77-228 | Grd, Auth.
Pineview Dam & Res | UT | Weber | Odgen R | FEIM | 110.0 | 4900.0 | 4818.0 | 2874 | 0 | PL 81-273 | USBR.
Platoro Dam & Res | CO | Conejos | Conejos R | F IR | 6.0 54.0 | 10034.0 10027.5 | 10027.5 9911.0 | 947 920 | 920 0 | PL 76-640 | USBR.
Priest Rapids Dam & Res | WA | Grant | Columbia R | FER | 44.0 | 488.0 | 481.5 | 7600 | 6500 | FERC No 2114-A | Grnt, PUD.
Prineville Dam & Res | OR | Crook | Crooked R | FIRC | 233.0 | 3257.9 | 3114.0 | 3997 | 140 | PL-84-992 | USBR.
Prosser Cr Dam & Res | CA | Nevada | Prosser Cr | C FC | 8.6 20.0 | 5703.7 5761.0 | 5661.0 5703.7 | 334 745 | 86 334 | PL 84-858 PL 85-706 | USBR.
Pueblo Dam & Res | CO | Pueblo | Arkansas R | F IR | 93.0 261.4 | 4898.7 4880.5 | 4880.5 4764.0 | 5671 4640 | 4640 421 | PL 87-590 | USBR.
Red Willow Dam Hugh Butler Lk | NE | Frontier | Red Willow Cr | F IRC | 48.9 27.3 | 2604.9 2581.8 | 2581.8 2558.0 | 2682 1629 | 1629 787 | PL 78-534 PL 85-783 PL 84-505 | USBR.
Ririe Dam & Res | ID | Bonneville | Willow Cr | FIRC | 99.0 | 5119.0 | 5023.0 | 150 | 360 | PL 87-874 | USBR.
Roanoke Rapids Dam & Res | NC | Halifax | Roanoke R | EC | 16.8 | 132.0 | 128.0 | 4600 | 4100 | FPC 2009 | VA, Pwr.
Rocky Reach Dam Lk Entiat | WA | Chelan | Columbia R | FER | 36.0 | 707.0 | 703.0 | 9920 | 9490 | FERC No 2145 | Chln PUD.
Rocky River PS Lk Candlewood | CT | Litchfield | Housatonic R | E | 142.5 | 430.0 | 418.0 | 5608 | 4692 | FERC 2576 | CLPC.
Ross Dam & Res | WA | Whatcom | Skagit R | E | 1052.0 | 1602.5 | 1475.0 | 11700 | 4450 | FERC 553 | Sttl.
Sanford Dam & Lk Meredith | TX | Hutchison | Canadian R | F IMCRQ | 462.1 761.3 | 2965.0 2941.3 | 2941.3 2860.0 | 21640 17320 | 17320 4500 | PL 81-898 | USBR.
Savage River Dam & Res | MD | Garrett | Savage R | FMA | 20.0 | 1468.5 | 1317.0 | 366 | 0 | PL 78-534 | Ptmc Comm.
Scoggins Dam Henry Hagg Lk | Scoggins Cr | FIR | 56.3 | 305.8 | 235.3 | 116 | 4 | PL 89-596 | USBR.
Shadehill Dam & Res | SD | Perkins | Grand R | F IQ | 218.3 80.9 | 2302.0 2271.9 | 2271.9 2250.8 | 9900 4800 | 4800 2800 | PL 78-534 | USBR.
Shasta Dam Lk | CA | Shasta | Sacramento R | FEIA EIA | 1300.0 3241.0 | 1067.0 1018.6 | 1018.6 735.8 | 29570 23894 | 23894 2200 | PL 75-392 | USBR.
Shepaug Dam & Lk | CT | Litchfield | Housatonic R | E | 5.0 | 200.0 | 172.0 | 1882 | 1125 | FERC 2576 | CLPC.
Smith Mtn Dam & Res | VA | Bedford Franklin Roanoke Pttsylvnia | Roanoke R | E | 40.8 | 795.0 | 793.0 | 20600 | 20200 | Fed Pwr Act | Appl Pwr.
Stampede Dam & Res | CA | Sierra | Little Truckee R | FEM EM | 22.0 199.4 | 5949.0 5942.0 | 5942.1 5798.0 | 3430 3230 | 3230 210 | PL 84-858 | USBR.
Starvation Dam and Res | UT | Duchesne | Strawberry R | FIM | 165.3 | 5712.0 | 5595.0 | 3310 | 689 | PL 84-485 | USBR.
Stevens Creek Dam & Res | GA | Columbia | Savannah River | P | 10.5 | 187.5 | 183.0 | 4300 | 0 | FERC 2535 | SC E&G.
Stevenson Dam Lk Zoar | CT | Litchfield | Housatonic R | E | 5.0 | 108.0 | 80.0 | 1148 | 516 | FERC 2576 | CLPC.
Summer Dam & Lk | NM | De Baca | Pecos R | FI | 51.4 | 4261.0 | 4200.0 | 2835 | 0 | PL 83-780 | USBR.
Tat Momolikot Dam & Lake | AZ | Pinal | Santa Rosa Wash | FIC | 198.5 | 1539.0 | 1480.0 | 11790 | 0 | PL 89-298 | BIA.
Tiber Dam & Res | MT | Libert Toole | Marias R | F FIQ IQ | 400.9 268.0 121.7 | 3012.5 2993.0 2976.0 | 2993.0 2976.0 2966.4 | 23150 17890 13790 | 17890 13790 11710 | PL 78-534 | USBR.
Trenton Dam & Res | NB | Hitchcock | Republican R | F IRC | 134.1 99.8 | 2773.0 2752.0 | 2752.0 2720.0 | 7940 4922 | 4922 1572 | PL 78-534 PL 84-505 | USBR.
Turners Falls (Low) Dam & Lk | MA | Franklin | Connecticut R | E | 8.7 | 185.0 | 176.0 | 2110 | 1880 | FERC 1889 | WMEC
Twin Buttes Dam & Lake | TX | Tom Green | Concho R | F IM | 454.4 150.0 | 1969.1 1940.2 | 1940.2 1885.0 | 23510 9080 | 23510 670 | PL 85-152 PL 78-534 | USBR
Twitchell Dam & Res | CA | Santa Barbara | Cuyama R | F IM | 89.8 135.6 | 651.5 623.0 | 623.0 504.0 | 3671 2556 | 2556 0 | PL 83-774 | USBR
Upper Baker Dam Baker Lk | WA | Whatcom | Baker R | FE | 184.6 | 724.0 | 674.0 | 4985 | 2375 | PL 89-298 FERC 2150B | Pgt P&L
Vallecito Dam & Res | CO | La Plata | Los Pinos R | FEI | 125.4 | 7665.0 | 7582.5 | 2720 | 350 | PL 61-288 PL 68-292 | USBR
Vernon Dam & Lk | VT | Windham | Connecticut R | E | 18.3 | 220.1 | 212.1 | 2550 | 1980 | FERC 1904 | NEPC
Wanapum Dam & Res | WA | Grant | Columbia R | FER | 151.6 | 571.5 | 560.0 | 14300 | 13350 | FERC No 2114-B | Grnt PUD
Wanship Dam & Rockport | UT | Summit | Weber R | FEIM | 61.0 | 6037.0 | 5930.0 | 1077 | 121 | PL 81-273 | USBR
Warm Springs Dam & Res | OR | Malheur | Middle Fork Malheur R | FICR | 191.0 | 3406.0 | 3327.0 | 460 | 90 | PL 78-534 | Vale USBR
Waterbury Dam & Res | VT | Washington | Little R | FP | 27.7 | 617.5 | 592.0 | 1330 | 890 | PL 78-534 | VT
Webster Dam & Res | KS | Rocks | S Fork Solomon R | F IRC | 183.4 72.1 | 1923.7 1892.5 | 1892.5 1860.0 | 8480 3772 | 3772 906 | PL 78-534 PL 79-526 PL 79-732 | USBR
Weiss Dam & Res | AL | Cherokee | Coosa R | F E | 397.0 148.4 | 574.0 564.0 | 564.0 558.0 | 50000 30200 | 30200 19545 | PL 83-436 | AL Pwr
Wells Dam L Pateros | WA | Douglas | Columbia R | FER | 74.0 | 781.0 | 771.0 | 10000 | 8000 | FERC No 2149 | Dgls PUD
Wilder Dam & Lk | VT | Windsor | Connecticut R | E | 13.3 | 385.0 | 380.0 | 3100 | 2240 | FERC 1893 | NEPC
Yellowtail Dam & Bighorn Lk | MT | Big Horn | Bighorn R | F FEIQ EIQ | 258.3 240.3 336.1 | 3657.0 3640.0 3614.0 | 3640.0 3614.0 3547.0 | 17280 12600 6915 | 12600 6915 4150 | PL 78-534 | USBR PUD
1 Cr—Creek; CS—Control Structure; Div—Diversion; DS—Drainage Structure; FG—Floodgate; Fk—Fork; GIWW—Gulf Intercoastal Waterway; Lk—Lake; L&D—Lock & Dam; PS—Pump Station; R—River; Res—Reservoir
2 F—Flood Control; N—Navigation; P—Corps Hydropower; E—Non Corps Hydropower; I—Irrigation; M—Municipal and/or Industrial Water Supply; C—Fish and Wildlife Conservation; A—Low Flow Augmentation or Pollution Abatement; R—Recreation; Q—Water Quality or Silt Control
3 FCA—Flood Control Act; FERC—Federal Energy Regulatory Comm; HD—House Document; PL—Public Law; PW—Public Works; RHA—River & Harbor Act; SD—Senate Document; WSA—Water Supply Act
4 Appl Pwr—Appalachian Power; Chln PUD—Chelan Cnty PUD 1; CLPC—CT Light & Power Co; Dgls PUD—Douglas Cnty PUD 1; DWR—Department of Water Resources; EB-MUD—East Bay Municipal Utility Dist; GRD—Grand River Dam Auth; Grnt PUD—Grant Cnty PUD 2; Hnbl—city of Hannibal; LCRA—Lower Colorado River Authority; M&T Irr—Modesto & Turlock Irr; Mrcd Irr—Merced Irr; NEPC—New England Power Co; Pgnt P&L—Pugent Sound Power & Light; Ptmc Comm—Upper Potomac R Comm; Rclm B—Reclamation Board; Rkfd—city of Rockford; Sttl—city of Seattle; Tac—City of Tacoma; Vale USBR—50% Vale Irr 50% USBR; WF&CWID—City of Wichita Falls and Wichita Cnty Water Improvement District No. 2; WMEC—Western MA Electric Co; YCWA—Yuba City Water Auth; Yolo FC&W—Yolo Flood Control & Water Conserv Dist.
(Sec. 7, Pub. L. 78-534, 58 Stat. 890 (33 U.S.C. 709); the Federal Power Act, 41 Stat. 1063 (16 U.S.C. 791(A)); and sec. 9, Pub. L. 83-436, 68 Stat. 303)
[43 FR 47184, Oct. 13, 1978, as amended at 46 FR 58075, Nov. 30, 1981; 55 FR 21508, May 24, 1990; 79 FR 13564, Mar. 11, 2014]
§ 208.19 Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Texas.
In the interest of flood control, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam and Reservoir in accordance with the water control plan of regulation most recently approved by the U.S. Army Corps of Engineers (USACE), effective on the date specified in the approval. Information regarding the most recently approved water control plan of regulation may be obtained by contacting the LCRA offices in Austin, Texas, or the offices of the U.S. Army Corps of Engineers, Fort Worth Engineer District, in Fort Worth, Texas.
[79 FR 13564, Mar. 11, 2014]
§ 208.22 Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.
The Bureau of Reclamation, or its designated agent, shall operate the Twin Buttes Dam and Reservoir in the interest of flood control as follows:
(a) Whenever the Twin Buttes Reservoir level is between elevations 1,940.2 (top of conservation pool) and elevation 1,969.1 (top of flood control pool) the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir. All flood control releases shall be made in amounts which, when combined with releases from San Angelo Reservoir on the North Concho River and local inflow below the dam, will not produce flows in excess of bankful capacities on the South Concho and Concho Rivers downstream of the reservoir. In order to accomplish this purpose, flows shall not exceed a 22.5-foot stage (25,000 c.f.s.) on the USGS gage on the Concho River near San Angelo, Tex. (river mile 60.9); or a 22.8-foot stage (25,000 c.f.s.) on the USGS gage near Paint Rock, Tex. (river mile 19.6).
(b) When the Twin Buttes Reservoir level exceeds elevation 1,969.1 (top of flood control pool), releases shall be made at the maximum rate possible and continued until the pool elevation recedes to elevation 1,969.1 when releases shall be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation in immediate charge of operation of the Twin Buttes Dam shall furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report, on forms provided by the District Engineer for this purpose, showing (1) for Twin Buttes Reservoir, the elevation of the reservoir level; number of river outlet works gates in operation with their respective openings and releases; uncontrolled spillway releases; storage; reservoir inflow; available evaporation data; and precipitation in inches; and (2) for Nasworthy Reservoir, the elevation of the reservoir level; irrigation outlet works and controlled spillway releases; storage; tailwater elevation; and reservoir inflow. Normally, one reading at 8 a.m. shall be shown for each day. Readings of all items except evaporation shall be shown for at least three observations a day when the Twin Buttes Reservoir level is above elevation 1,940.2. Whenever the Twin Buttes Reservoir level rises to elevation 1,940.2 and releases for flood regulation are necessary or appear imminent, the Bureau representative shall report at once to the District Engineer by telephone or telegraph and, unless otherwise instructed, shall report once daily thereafter in that manner until the reservoir level recedes to elevation 1,940.2. These latter reports shall reach the District Engineer by 9 a.m. each day.
(d) The regulations of this section insofar as they govern use of the flood control storage capacity in Twin Buttes Reservoir above elevation 1,940.2 are subject to temporary modification in time of flood by the District Engineer, if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation in immediate charge of operations of the Twin Buttes Dam by any available means of communication and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, with a copy to the representative in charge of the Twin Buttes Dam.
(e) Flood control operation shall not restrict releases necessary for municipal, industrial, and irrigation uses.
(f) Releases made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the Twin Buttes Dam and Reservoir from major damage or inconsistent with safe routing of the inflow design flood (spillway design flood).
(g) The discharge characteristics of the river outlet works (capable of discharging approximately 32,470 c.f.s. with the reservoir level at elevation 1,969.1) shall be maintained in accordance with the construction plans (Bureau of Reclamation Specifications No. DC-5274 as modified by revised drawings and criteria in Designers' Operating Criteria, Twin Buttes Dam, dated February 1963).
(h) All elevations stated in this section are at Twin Buttes Dam and are referred to the datum in use at that location.
[31 FR 12521, Sept. 22, 1966]
§ 208.25 Pensacola Dam and Reservoir, Grand (Neosho) River, Okla.
The representative of the agency charged with the operation of the Pensacola Dam, referred to in this section as the Representative shall operate the dam and reservoir in the interest of flood control as follows:
(a) Whenever the pool stage exceeds elevation 745 at the dam, the discharge facilities shall be operated under the direction of the District Engineer, Engineer Department at Large, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir and to limit the pool stage to elevation 755 at the dam.
(b) The District Engineer will advise the Representative when inflow rates are anticipated which will raise the pool above elevation 745 at the dam. The District Engineer will also advise the Representative of essential increase in the flood control storage capacity of the reservoir which should be provided by drawing the pool down below elevation 745 at the dam in order to obtain maximum flood control benefits, with the provision that the suggested reduction in power storage shall at no time exceed the replacement volume of flow then in sight in the streams above the reservoir.
(c) The Representative shall furnish the District Engineer, daily, a report showing the elevation of the reservoir pool and the tailwater, number of gates in operation, spillway and turbine releases, evaporation, storage, reservoir inflow, and precipitation in inches as shown by Agency gages. One reading shall be shown for each day with additional readings of releases for all changes in spillway gate operation, and with readings of all items except evaporation three times daily when the District Engineer advises the Representative that flood conditions are imminent. By agreement between the Representative and the District Engineer, any of the foregoing information may be furnished by telephone and may, if agreed upon, be omitted from the report. Whenever the pool is above elevation 745 at the dam the Representative shall submit additional reports by telegraph or telephone as directed by the District Engineer, with a report to be furnished immediately whenever the pool rises above elevation 745 at the dam.
(d) The District Engineer will furnish the Representative with all available information and detailed instructions for operation of the reservoir in the interest of flood control during an emergency condition when communications between the dam and the District Office are broken. In the event that the District Engineer or his authorized representative cannot be reached by telephone, telegraph or by other means during a flood emergency, these instructions will govern. The provisions of paragraphs (a), (b), and (c) of this section will govern at all times except during such an emergency.
(e) Elevations stated in this section are referred to Pensacola datum which is 1.07 feet below mean sea level.
[10 FR 15044, Dec. 14, 1945]
§ 208.26 Altus Dam and Reservoir, North Fork Red River, Okla.
The Bureau of Reclamation, or its designated agent, shall operate the Altus Dam and Reservoir in the interest of flood control as follows:
(a) Flood control storage in the reservoir between elevation 1559 (top of conservation pool) and elevation 1562 (top of flood control pool) amounts to 21,448 acre-feet (based on 1953 sedimentation survey). Whenever the reservoir level is within this elevation range, the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the dam, and to limit the reservoir level to elevation 1562 when possible.
(b) When the reservoir level is below elevation 1559 and the predicted volume of runoff from the area above the dam exceeds the volume of water necessary to raise the reservoir level above elevation 1559, the reservoir will be operated to obtain maximum overall benefits which may consist of preflood releases: Provided, That all preflood releases will have prior concurrence of the Bureau of Reclamation or its designated agent. The preflood releases shall not result in a reservoir level below elevation 1559 at the end of the flood.
(c) When the reservoir level exceeds elevation 1559, releases will be made equal to inflow or 2,000 c.f.s., whichever is smaller, except that when the reservoir elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562, releases will be increased in order to provide maximum overall benefits and prevent the reservoir level from exceeding elevation 1562, insofar as possible. The flood control pool will be emptied by continuing the peak discharge rate until the reservoir level recedes to elevation 1559, at which time releases will be made equal to inflow.
(d) If the reservoir level exceeds elevation 1562 (top of flood control pool) releases shall be made at the maximum rate possible through the spillway gates, conduit, and the uncontrolled spillway and continued until the reservoir level recedes to elevation 1559, at which time releases will be made equal to inflow.
(e) Whenever the reservoir level is above elevation 1559 and communication with the Bureau of Reclamation Regional Office and the Corps of Engineers District Office is unobtainable, releases shall be made equal to inflow until all gates are fully open. The maximum release thus obtained shall be maintained until the pool recedes to elevation 1559 at which time releases shall be made to equal inflow.
(f) The representative of the Bureau of Reclamation, or its designated agent, in immediate charge of the operation of Altus Dam will furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report on forms provided by the District for this purpose, showing the reservoir pool elevation; the number of spillway gates in operation with their respective opening and releases; the uncontrolled spillway release; conduit, canal outlet wasteway, and irrigation releases; storage; reservoir inflow; available evaporation data; and precipitation in inches. A reading at 8 a.m., noon, 4 p.m., and midnight, shall be shown for each day. Whenever the reservoir level rises to elevation 1559 and releases for flood control regulation are necessary or appear imminent, the representative of the Bureau of Reclamation or its designated agent, shall report at once to the District Engineer by telephone or telegraph and, unless otherwise instructed, shall report at 8 a.m., noon, and 3 p.m. thereafter, in that manner, until the reservoir level recedes to elevation 1559. These latter reports shall reach the District Engineer by 9 a.m., 1 p.m., and 4 p.m. each day.
(g) The regulations of this section, insofar as they govern use of the flood control storage capacity above elevation 1559 are subject to temporary modification by the District Engineer in time of flood, if found desirable on the basis of conditions at the time. Such desired modifications shall be coordinated with and approved by the Bureau of Reclamation.
(h) Flood control operation shall not restrict releases necessary for irrigation, municipal, and industrial uses.
(i) Releases made in accordance with the regulations of this section are subject to the conditions that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and reservoir from major damage.
(j) Any time that the Bureau of Reclamation determines that operation in accordance with the regulations of this section will jeopardize the safety of Altus Dam, they will so advise the District Engineer and will assume operational responsibility and take action necessary to assure the safety of the dam.
(k) The discharge characteristics of the controlled and the uncontrolled spillways (capable of discharging approximately 42,800 c.f.s. and 2,000 c.f.s., respectively, with the reservoir level at elevation 1562) shall be maintained in accordance with the construction plans (Bureau of Reclamation Drawing No. 258-D-69).
(l) All elevations stated in this section are at Altus Dam and are referred to the datum in use at that location.
[33 FR 12733, Sept. 7, 1968]
§ 208.27 Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.
The Bureau of Reclamation shall operate the Fort Cobb Dam and Reservoir in the interest of flood control as follows:
(a) Whenever the reservoir level is between elevation 1342.0, top of the conservation pool, and elevation 1354.8, top of flood control pool, the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir. All flood control releases shall be made in amounts which, when combined with local inflow below the dam, will not produce flows in excess of bankfull on Pond (Cobb) Creek downstream of the reservoir and on the Washita River downstream of their confluence. In order to accomplish this purpose, flows shall not exceed a 13.0-foot stage (1,300 cfs) on the USGS gage on Pond (Cobb) Creek near Fort Cobb, Oklahoma, river mile 5.0; a 19.0-foot stage (6,000 cfs) on the USGS gage on the Washita River near Anadarko, Oklahoma, river mile 305.0; or a 19.0-foot stage on the USGS gage near Bradley, Oklahoma, river mile 210.6.
(b) When the reservoir level exceeds elevation 1354.8, top of flood control pool, releases shall be made at the maximum rate possible and continued until the pool elevation recedes to elevation 1354.8 when releases shall be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation in immediate charge of operation of the Fort Cobb Dam shall furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report, on forms provided by the District Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with their respective openings and releases; uncontrolled spillway and municipal outlet works release; storage; tailwater elevation; reservoir inflow; available evaporation data; and precipitation in inches. Normally, one reading at 8:00 a.m., shall be shown for each day. Readings of all items except evaporation shall be shown for at least three observations a day when the reservoir level is above elevation 1342.0. Whenever the reservoir level rises to elevation 1342.0 and releases for flood regulation are necessary or appear imminent, the Bureau representative shall report at once to the District Engineer by telephone or telegraph and, unless otherwise instructed, shall report once daily thereafter in that manner until the reservoir level recedes to elevation 1342.0. These latter reports shall reach the District Engineer by 9:00 a.m., each day.
(d) The regulations of this section insofar as they govern use of the flood control storage capacity above elevation 1342.0 are subject to temporary modification in time of flood by the District Engineer if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation in immediate charge of operations of the Fort Cobb Dam by any available means of communication and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, with a copy to the representative in charge of the Fort Cobb Dam.
(e) Flood control operation shall not restrict releases necessary for municipal-industrial and irrigation uses:
(f) Releases made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and reservoir from major damage or inconsistent with safe routing of the inflow design flood.
(g) All elevations stated in this section are at Fort Cobb Dam and are referred to the datum in use at that location.
[26 FR 3190, Apr. 14, 1961]
§ 208.28 Foss Dam and Reservoir, Washita River, Oklahoma.
The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of flood control as follows:
(a) Whenever the reservoir level is between elevation 1652.0, top of conservation pool, and elevation 1668.6, top of flood control pool, the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir. All flood control releases shall be made in amounts which, when combined with local inflow below the dam, will not produce flows in excess of bankfull on the Washita River downstream of the reservoir. In order to accomplish this purpose, flows shall not exceed an 18.0 foot stage (3,000 c.f.s.) on the USGS gage on the Washita River near Clinton, Oklahoma, river mile 447.4, or an 18.0 foot stage (6,000 c.f.s.) on the USGS gage on the Washita River near Carnegie, Oklahoma, river mile 353.9.
(b) When the reservoir level exceeds elevation 1668.6, top of flood control pool, releases shall be made at the maximum rate possible through the river outlet works and uncontrolled spillway and continued until the pool elevation recedes to elevation 1668.6 when releases shall be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation in immediate charge of operation of the Foss Dam shall furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, on forms provided by the District Engineer for this purpose, a report, showing the elevation of the reservoir level; number of river outlet works gates in operation with their respective openings and releases; canal outlet works, municipal outlet works and uncontrolled spillway releases; storage; tailwater elevation; reservoir inflow; available evaporation data; and precipitation in inches. Normally, one reading at 8:00 a.m. shall be shown for each day. Readings of all items except evaporation shall be shown for at least three observations a day when the reservoir level is above elevation 1652.0. Whenever the reservoir level rises to elevation 1652.0 and releases for flood regulation are necessary or appear imminent, the Bureau representative shall report at once to the District Engineer by telephone or telegraph and, unless otherwise instructed, shall report once daily thereafter in that manner until the reservoir level recedes to elevation 1652.0. These latter reports shall reach the District Engineer by 9:00 a.m., each day.
(d) The regulations of this section insofar as they govern use of the flood control storage capacity above elevation 1652.0 are subject to temporary modification in time of flood by the District Engineer if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation in immediate charge of operations of the Foss Dam by any available means of communication and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, with a copy to the representative in charge of the Foss Dam.
(e) Flood control operations shall not restrict releases necessary for municipal-industrial and irrigation uses.
(f) Releases made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and reservoir from major damage or inconsistent with safe routing of the inflow design flood.
(g) All elevations stated in this section are at Foss Dam and are referred to the datum in use at that location.
[26 FR 6982, Aug. 3, 1961]
§ 208.29 Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.
The Bureau of Reclamation, or its designated agent, shall operate the Arbuckle Dam and Lake of the Arbuckles in the interest of flood control as follows:
(a) Flood control storage in Lake of the Arbuckles between elevation 872 (top of conservation pool) and elevation 885.3 (top of flood control pool) initially amounts to 36,400 acre-feet. Whenever the lake level is within this elevation range the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable of the flood damage below the lake. In order to accomplish this purpose, flood control releases shall be limited to amounts, which when combined with local inflows below the dam will not produce flows in excess of bankfull on Rock Creek downstream of the lake and on the Washita River, from the confluence of Rock Creek to Durwood, Okla. Operating stages and corresponding flows are as follows: An 11-foot stage (15,000 c.f.s.) on the U.S.G.S. gage on Rock Creek near Dougherty, Okla., river mile 1; and a 20-foot stage (15,000 c.f.s.) on the U.S.G.S. gage on the Washita River near Durwood, Okla., river mile 63.4.
(b) When the level in Lake of the Arbuckles exceeds elevation 885.3 (top of flood control pool), releases shall be made at the maximum rate possible through the river outlet works and the uncontrolled spillway and continued until the lake level recedes to elevation 885.3 when releases shall be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation or its designated agent in immediate charge of operation of the Arbuckle Dam shall furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report, on forms provided by the District Engineer for this purpose, showing the lake elevation; the number of river outlet works gates in operation with their respective openings and releases; uncontrolled spillway release; municipal pumping rate; tailwater elevation; available evaporation data; and precipitation in inches. Normally, a reading at 8 a.m., noon, 4 p.m., and midnight shall be shown for each day. Whenever the lake level rises to elevation 872 and releases for flood regulation are necessary or appear imminent, the representative of the Bureau of Reclamation or its designated agent, shall report at once to the District Engineer by telephone or telegraph and unless otherwise instructed shall report once daily thereafter in that manner until the lake level recedes to elevation 872. These latter reports shall reach the District Engineer by 9 a.m. each day.
(d) The regulations of this section, insofar as they govern use of flood control storage capacity above elevation 872, are subject to temporary modification in time of flood by the District Engineer if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation and its designated agent in immediate charge of operation of the Arbuckle Dam by any available means of communication, and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, and his designated agent, with a copy to the representative in charge of the Arbuckle Dam.
(e) Flood control operation shall not restrict pumping necessary for municipal and industrial uses and releases necessary for downstream users.
(f) Releases made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and lake from major damage or inconsistent with the safe routing of the inflow design flood (spillway design flood).
(g) The discharge characteristics of the river outlet works (capable of discharging approximately 1,880 c.f.s. when the lake level is at 872) shall be maintained in accordance with the construction plans (Bureau of Reclamation Specifications No. 6099 as modified by the “as built” drawings).
(h) All elevations stated in this section are at Arbuckle Dam and are referred to the datum in use at that location.
[33 FR 263, Jan. 9, 1968]
§ 208.32 Sanford Dam and Lake Meredith, Canadian River, Tex.
The Bureau of Reclamation, or its designated agent, shall operate the Sanford Dam and Lake Meredith in the interest of flood control as follows:
(a) Flood control storage in the reservoir, Lake Meredith, between elevation 2941.3 (top of conservation pool) and elevation 2965.0 (top of flood control pool) initially amounts to 462,100 acre-feet. Whenever the reservoir level is within this elevation range, the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir. All flood control releases shall be made in amounts which, when combined with local inflow below the dam, will not produce flows in excess of bankfull on the Canadian River downstream of the reservoir. In order to accomplish this purpose, flows shall not exceed 25,000 c.f.s. at the Sanford Dam site or an 8.0-foot stage (75,000 c.f.s.) on the U.S.G.S. gage on the Canadian River near Canadian, Tex., river mile 433.9.
(b) When the reservoir level exceeds elevation 2965.0 (top of flood control pool) releases shall be made at the maximum rate possible through the flood control outlet works, the river outlet works and the uncontrolled spillway and continue until the pool level recedes to elevation 2965.0 when releases will be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation, or its designated agent in immediate charge of operation of the Sanford Dam will furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report, on forms provided by the District Engineer for this purpose showing the pool elevation; the number of flood control outlet works gates in operation with their respective openings and releases; the uncontrolled spillway release; and the municipal outlet works release; storage; tailwater elevation; reservoir inflow; available evaporation data; and precipitation in inches. Normally a reading at 8 a.m., noon, 4 p.m., and midnight, shall be shown for each day. Readings of all items except evaporation shall be shown for at least four observations a day when the reservoir level is at or above elevation 2941.3. Whenever the reservoir level rises to elevation 2941.3 and releases for flood regulation are necessary or appear imminent, the representative of the Bureau of Reclamation, or its designated agent, shall report at once to the District Engineer by telephone or telegraph and, unless otherwise instructed, will report once daily thereafter in that manner until the reservoir level recedes to elevation 2941.3. These latter reports shall reach the District Engineer by 9 a.m. each day.
(d) The regulations of this section, insofar as they govern use of the flood control storage capacity above elevation 2941.3, are subject to temporary modification in time of flood by the District Engineer if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation and its designated agent in immediate charge of operation of the Sanford Dam by the best available means of communication, and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, and his designated agent, with a copy to the representative in charge of the Sanford Dam.
(e) Flood control operation shall not restrict pumping necessary for municipal and industrial uses and releases necessary for downstream users.
(f) Release made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and reservoir from major damage or inconsistent with the safe routing of the inflow design flood (spillway design flood).
(g) The discharge characteristics of the flood control outlet works (capable of discharging approximately 22,000 c.f.s. with the reservoir level at elevation 2941.3) shall be maintained in accordance with the construction plans (Bureau of Reclamation Specifications No. DC-5725 as modified by revised drawings and criteria in Designers' Operating Criteria, Sanford Dam, dated October 1965).
(h) All elevations stated in this section are at Sanford Dam and are referred to the datum in use at that location.
[31 FR 7751, June 1, 1966]
§ 208.33 Cheney Dam and Reservoir, North Fork of Ninnescah River, Kans.
The Bureau of Reclamation, or its designated agent, shall operate the Cheney Dam and Reservoir in the interest of flood control as follows:
(a) Flood control storage in the reservoir is the capacity between elevation 1421.6 (top of the conservation pool) and elevation 1429.0 (top of the flood control pool), and initially amounts to 80,860 acre-feet. Whenever the reservoir level is within this range the flood control discharge facilities shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir. All flood control releases shall be made in amounts which, when combined with local inflow below the dam, will not produce flows in excess of bankfull on the North Fork of Ninnescah and Ninnescah River downstream of the reservoir and on the Arkansas River to Arkansas City, Kans. In order to accomplish this, flows shall not exceed a 90-foot stage (2,500 c.f.s.) on the U.S.G.S. gage on North Fork of Ninnescah River near Cheney, Kans., river mile 8.8; a 12-foot stage (7,000 c.f.s.) on the U.S.G.S. gage on Ninnescah River near Peck, Kans., river mile 31.6; and a 16-foot stage (18,000 c.f.s.) on the U.S.W.B. gage on Arkansas River at Arkansas City, Kans., river mile 701.4.
(b) When the reservoir level exceeds elevation 1429.0 (top of flood control pool), releases shall be made at the maximum rate possible through the river outlet works and the uncontrolled spillway and continued until the pool recedes to elevation 1429.0 when releases shall be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation or its designated agent in immediate charge of operation of the Cheney Dam shall furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report, on forms provided by the District Engineer for this purpose, showing the pool elevation; the number of river outlet works gates in operation with their respective openings and releases; uncontrolled spillway release; municipal pumping rate; storage; tailwater elevation; reservoir inflow; available evaporation data; and precipitation in inches. Normally, a reading at 8 a.m., noon, 4 p.m., and midnight, shall be shown for each day. Whenever the reservoir pool rises to elevation 1421.6 and releases for flood regulation are necessary or appear imminent, the representative of the Bureau of Reclamation or its designated agent, shall report at once to the District Engineer by telephone or telegraph, and, unless otherwise instructed, shall report once daily thereafter in that manner until the reservoir pool recedes to elevation 1421.6. These latter reports shall reach the District Engineer by 9 a.m. each day.
(d) The regulations of this section, insofar as they govern use of flood control storage capacity above elevation 1421.6, are subject to temporary modification in time of flood by the District Engineer if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation and its designated agent in immediate charge of operations of the Cheney Dam by any available means of communication, and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, and his designated agent, with a copy to the representative in charge of the Cheney Dam.
(e) Flood control operation shall not restrict pumping necessary for municipal and industrial uses and releases necessary for downstream users.
(f) Releases made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and reservoir from major damage or inconsistent with the safe routing of the inflow design flood (spillway design flood).
(g) The discharge characteristics of the river outlet works (capable of discharging approximately 3,590 c.f.s. with the reservoir level at elevation 1421.6) shall be maintained in accordance with the construction plans (Bureau of Reclamation Specifications No. DC-5744 as modified by revised drawings and criteria in Designers' Operating Criteria, Cheney Dam, dated November 1964).
(h) All elevations stated in this section are at Cheney Dam and are referred to the datum in use at that location.
[31 FR 7751, June 1, 1966]
§ 208.34 Norman Dam and Lake Thunderbird, Little River, Okla.
The Bureau of Reclamation, or its designated agent, shall operate Norman Dam and Lake Thunderbird in the interest of flood control as follows:
(a) Flood control storage in Lake Thunderbird between elevation 1039 (top of the conservation pool) and elevation 1049.4 (top of flood control pool) initially amounts to 76,600 acre-feet. Whenever the reservoir level is within this elevation range the flood control discharge facilities at Norman Dam shall be operated under the direction of the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, so as to reduce as much as practicable the flood damage below the reservoir. In order to accomplish this purpose, flood control releases shall be limited to amounts which, when combined with local inflows below the dam, will not produce flows in excess of bankfull on the Little River downstream of the reservoir. Controlling bankfull stages and corresponding flows, as presently estimated, are as follows: A 7.5-foot stage (1,800 c.f.s.) on the U.S.G.S. gage on Little River near Tecumseh, Okla., river mile 77.2 and a 17-foot stage (6,500 c.f.s.) on the U.S.G.S. gage on Little River near Sasakwa, Okla., river mile 24.1.
(b) When the reservoir level in Lake Thunderbird exceeds elevation 1049.4 (top of flood control pool), releases shall be made at the maximum rate possible through the river outlet works and the uncontrolled spillway and continued until the pool recedes to elevation 1049.4 when releases shall be made to equal inflow or the maximum release permissible under paragraph (a) of this section, whichever is greater.
(c) The representative of the Bureau of Reclamation or its designated agent in immediate charge of operation of the Norman Dam shall furnish daily to the District Engineer, Corps of Engineers, Department of the Army, in charge of the locality, a report, on forms provided by the District Engineer showing the pool elevation; the number of river outlet works gates in operation with their respective openings and releases; uncontrolled spillway release; municipal pumping rate; storage; tail water elevation; reservoir inflow; available evaporation data; and precipitation in inches. Normally, a reading at 8 a.m., noon, 4 p.m. and midnight, shall be shown for each day. Whenever the reservoir level rises to elevation 1039 and releases for flood regulation are necessary or appear imminent, the representative of the Bureau of Reclamation or its designated agent, shall report at once to the District Engineer by telephone or telegraph and, unless otherwise instructed, shall report once daily thereafter in that manner until the reservoir level recedes to elevation 1039. These latter reports shall reach the District Engineer by 9 a.m. each day.
(d) The regulations of this section, insofar as they govern use of flood control storage capacity above elevation 1039.0, are subject to temporary modification in time of flood by the District Engineer if found desirable on the basis of conditions at the time. Such desired modifications shall be communicated to the representative of the Bureau of Reclamation and its designated agent in immediate charge of operations of the Norman Dam by any available means of communication, and shall be confirmed in writing under date of the same day to the Regional Director in charge of the locality, and his designated agent, with a copy to the representative in charge of the Norman Dam.
(e) Flood control operation shall not restrict pumping necessary for municipal and industrial uses and releases necessary for downstream users.
(f) Releases made in accordance with the regulations of this section are subject to the condition that releases shall not be made at rates or in a manner that would be inconsistent with emergency requirements for protecting the dam and reservoir from major damage or inconsistent with the safe routing of the inflow design flood (spillway design flood).
(g) The discharge characteristics of the river outlet works (capable of discharging approximately 5,400 c.f.s. with the reservoir level at elevation 1039.0) shall be maintained in accordance with the construction plans (Bureau of Reclamation Specifications No. DC-5793 as revised by the “as built drawings”).
(h) All elevations stated in this section are at Norman Dam and are referred to the datum in use at that location.
[34 FR 4967, Mar. 7, 1969]
§ 208.82 Hetch Hetchy, Cherry Valley, and Don Pedro Dams and Reservoirs.
The Turlock Irrigation District and Modesto Irrigation District, acting jointly, hereinafter called the Districts, shall operate Don Pedro Dam and Reservoir in the interest of flood control, and the City and County of San Francisco, hereinafter called the City, shall operate Hetch Hetchy Dam and Reservoir and Cherry Valley Dam and Reservoir in the interest of flood control all as follows:
(a) Storage space in Don Pedro Reservoir shall be kept available for flood-control purposes in accordance with the Flood-Control Storage Reservation Diagram currently in force for that reservoir, except when storage of floodwater is necessary as prescribed in paragraph (d) of this section. The Flood-Control Storage Reservation Diagram in force as of the promulgation of this section is that dated 4 April 1956, File No. TU-1-26-7, and is on file in the Office of the Chief of Engineers, Department of the Army, Washington, D.C., in the office of the Turlock Irrigation District, Turlock, California, and in the office of the Modesto Irrigation District, Modesto, California. Revisions of the Flood-Control Storage Reservation Diagram may be developed from time to time as necessary by the Corps of Engineers and the Districts. Each such revision shall be effective upon the date specified in the approval thereof by the Chief of Engineers and by the presidents of the Districts and from that date until replaced shall be the Flood-Control Storage Reservation Diagram currently in force for the purpose of this section. Copies of the Flood-Control Storage Reservation Diagram currently in force shall be kept on file in and may be obtained from the office of the District Engineer, Corps of Engineers, in charge of the locality, the office of the Turlock Irrigation District, Turlock, California, and the office of the Modesto Irrigation District, Modesto, California.
(b) Storage space in Hetch Hetchy Reservoir shall be kept available for flood-control purposes in accordance with the Flood-Control Storage Reservation Diagram for that reservoir currently in force, except when storage of floodwater is necessary as prescribed in paragraph (e) of this section. The Flood-Control Storage Reservation Diagram in force as of the promulgation of this section is that dated April 4, 1956, File No. TU-3-26-1, and is on file in the Office. Chief of Engineers, Department of the Army, Washington, D.C., and in the office of the Public Utilities Commission of the City and County of San Francisco, California. Revisions of the Flood-Control Storage Reservation Diagram may be developed from time to time as necessary by the Corps of Engineers and the City. Each such revision shall be effective upon the date specified in the approval thereof by the Chief of Engineers and by the Public Utilities Commission of the City and County of San Francisco, California, and from that date until replaced shall be the Flood-Control Storage Reservation Diagram currently in force for the purpose of this section. Copies of the Flood-Control Storage Reservation Diagram currently in force shall be kept on file in and may be obtained from the office of the District Engineer, Corps of Engineers, in charge of the locality, and the office of the Public Utilities Commission of the City and County of San Francisco, California.
(c) Storage space in Cherry Valley Reservoir shall be kept available for flood-control purposes in accordance with the Flood-Control Reservation Diagram currently in force for that reservoir except when storage of floodwater is necessary as prescribed in paragraph (e) of this section. The Flood-Control Storage Reservoir Diagram in force as of the promulgation of this section is that dated April 4, 1956, File No. TU-2-26-6, and is on file in the Office, Chief of Engineers, Corps of Engineers, Department of the Army, Washington, D.C., and in the office of the Public Utilities Commission of the City and County of San Francisco, California. Revisions of the Flood-Control Storage Reservation Diagram may be developed from time to time as necessary by the Corps of Engineers and the City. Each such revision shall be effective upon the date specified in the approval thereof by the Chief of Engineers and by the Public Utilities Commission of the City and County of San Francisco, California, and from that date until replaced shall be the Flood-Control Storage Reservation Diagram currently in force for the purpose of this section. Copies of the Flood-Control Storage Reservation Diagram currently in force shall be kept on file in and may be obtained from the office of the District Engineer, Corps of Engineers, in charge of the locality, and the office of the Public Utilities Commission of the City and County of San Francisco, California.
(d) Any water temporarily stored in the flood-control space indicated by the Flood-Control Storage Reservation Diagram currently in force for Don Pedro Reservoir shall be released as rapidly as can be accomplished without causing flows in Tuolumne River below LaGrange Dam to exceed 7,000 c.f.s. during rain floods or to exceed 9,000 c.f.s. at all other times.
(e) Any water temporarily stored in the flood-control space indicated by the Flood-Control Storage Reservation Diagrams currently in force for Hetch Hetchy and Cherry Valley Reservoirs shall be released as rapidly as can be accomplished without exceeding the respective safe channel capacities, and without materially contributing to major encroachment into the flood-control space at Don Pedro Reservoir. Such releases shall be proportioned between Hetch Hetchy and Cherry Valley Reservoirs in such manner as to assure that the percentage of encroachment into the flood-control space at the two reservoirs will tend toward equality insofar as possible. Whenever the storage space in Don Pedro Reservoir is less than 90 percent of that indicated by the Flood-Control Storage Reservation Diagram currently in force for that reservoir, releases from Hetch Hetchy and Cherry Valley Reservoirs shall be restricted to those required in connection with the generation of hydroelectric power in the power system of the City and in connection with diversion into the water supply system of the City.
(f) In the event that the water level in Don Pedro Reservoir rises above elevation 605.55 at the dam (top of spillway gates), subsequent operation of the dam shall be such as to cause downstream flows to exceed as little as possible the criteria prescribed in paragraph (d) of this section, and in no event to cause the maximum subsequent release from the reservoir to exceed the estimated maximum subsequent inflow to the reservoir.
(g) In the event that the water level in Hetch Hetchy Reservoir rises above elevation 3806 at the dam (top of spillway gates), subsequent operation of the dam shall be such as to cause downstream flows to exceed as little as possible the criteria prescribed in paragraph (e) of this section, and in no event to cause the maximum subsequent release from the reservoir to exceed the estimated maximum subsequent inflow to the reservoir.
(h) In the event that the water level in Cherry Valley Reservoir rises above elevation 4700 at the dam (spillway crest), subsequent operation of the dam shall be such as to cause downstream flows to exceed as little as possible the criteria prescribed in paragraph (e) of this section, and in no event to cause the maximum subsequent release from the reservoir to exceed the estimated maximum subsequent inflow to the reservoir.
(i) Nothing in the regulations of this section shall be construed to require dangerously rapid changes in magnitudes of releases from any of the reservoirs.
(j) The Districts shall procure such current basic hydrologic data, make such current determinations of required flood-control storage reservation in Don Pedro Reservoir, and current calculations of permissible releases from Don Pedro Reservoir as are required to accomplish the flood-control objectives of the regulations of this section.
(k) The City shall procure such current basic hydrologic data, and make such current calculations of permissible releases from Hetch Hetchy and Cherry Valley Reservoirs as are required to accomplish the flood-control objectives of the regulations of this section.
(l) The City shall keep the District Engineer, Corps of Engineers, in charge of the locality, and the Districts currently advised of reservoir releases, reservoir storages, basic operating criteria which affect the schedule of operations, and such other operating data as the District Engineer, Corps of Engineers, may request for Hetch Hetchy, Eleanor, and Cherry Valley Reservoirs.
(m) The Districts shall keep the District Engineer, Corps of Engineers, in charge of the locality, and the City currently advised of reservoir releases, reservoir storages, basic operating criteria which affect the schedule of operations, and such other operating data as the District Engineer, Corps of Engineers, may request for Don Pedro Reservoir.
(n) The flood-control regulations of this section are subject to temporary modification by the District Engineer, Corps of Engineers, if found necessary in time of flood emergency. Request for and action on such modifications may be made by any available means of communication, and such action shall be confirmed in writing under date of same day to the operating agency for the reservoir affected.
[21 FR 2682, Apr. 26, 1956]
PART 209 ADMINISTRATIVE PROCEDURE
Authority: 5 U.S.C. 301; 33 U.S.C. 1; 10 U.S.C. 3012.
Source: 33 FR 18670, Dec. 18, 1968, unless otherwise noted.
§ 209.50 Mississippi River Commission: Public observation of Commission meetings.
(a) Purpose. (1) The purpose of this regulation is to afford to the public, to the fullest possible extent, information regarding the decisionmaking processes of the Mississippi River Commission and to open all meetings of the Mississippi River Commission to public observation except in instances where a portion or portions of a meeting may be closed to the public in accordance with this regulation in order to protect the rights of individuals and/or in order to permit the Mississippi River Commission to carry out its statutory and assigned functions and responsibilities. This regulation is issued in accordance with section (g) of the Government in the Sunshine Act and implements sections (b) through (f) of said Act (5 U.S.C. 552b (b) through (f)).
(2) Public observation of Mississippi River Commission meetings includes public participation in the deliberations of the Commission only to the extent specifically provide in public notices of such meetings.
(b) Definitions. The following definitions apply to the regulation in this section.
(1) Commission means The Mississippi River Commission.
(2) President means the duly appointed President and Executive Officer of the Commission.
(3) Commissioner means a duly appointed member of the Commission.
(4) Secretary means the Secretary of the Commission.
(5) Chief Legal Officer means the Division Counsel or the acting Division Counsel of the Lower Mississippi Valley Division, Corps of Engineers.
(6) Meeting means the deliberations of at least a majority of the Commissioners where such deliberations determine or result in the joint conduct or disposition of official Commission business, but does not include:
(i) Deliberations of the Commission in determining whether or not to close a portion or portions of a meeting in accordance with paragraphs (e)(4) and (e)(5) of this section.
(ii) Deliberations of the Commission in determining whether or not to withhold from disclosure information pertaining to a portion or portions of a meeting as provided in paragraphs (e)(4) and (e)(5) of this section.
(iii) Deliberations of the Commission pertaining to changes in the subject matter of a meeting or changes in the determination to open or close a portion or portions of a meeting to the public following the public announcement of such meeting in accordance with paragraph (d)(4) of this section.
(iv) Deliberations of the Commission in determining whether to waive the one-week public notice requirement in accordance with paragraph (d)(2) of this section.
(c) Time, place, and agenda of meetings. (1) The meetings of the Commission, except those held on Government boats during inspection trips of the Commission, shall be held at Vicksburg, Mississippi. The time of such meetings shall be fixed by the President of the Commission, who shall cause due notice of such meetings to be given members of the Commission and the public.
(33 U.S.C. 646)
(2) The President shall, after consultation with the Commissioners, prepare a detailed agenda for planned Commission meetings at the earliest practicable time. Suggestions from the public of proposed agenda items are invited.
(d) Public notices and Federal Register publication. (1) At least one week before each Commission meeting the Secretary shall issue a public announcement which (i) States the time and place of the meeting,
(ii) Lists the agenda items or subjects to be discussed at the meeting,
(iii) States whether the meeting or portions of the meeting are to be closed or open to public observation,
(iv) States whether or not public participation in the meeting will be permitted, and
(v) States the name and business phone number of the official who will respond to requests for information about the meeting. Public announcements of Commission meetings shall include releases to the news media in the Lower Mississippi River Valley and mailing notices of such meetings to all persons and agencies known to have an interest in the Commission's work and to others who request such announcements.
(2) The one-week period for public notice required by paragraph (d)(1) of this section shall not be applicable when a majority of the entire membership of the Commission determines by a recorded vote that Commission business requires that a meeting be called at an earlier date. The Secretary shall, however, issue the public notice required by paragraph (d)(1) of this section at the earliest practicable time.
(3) When due to unforeseen circumstances it is necessary to change the time or place of a meeting following the public announcement required by paragraph (d)(1) of this section, the Secretary will publicly announce such change at the earliest practicable time.
(4) The subject matter of a meeting, or the determination of the Commission to open or close a portion or portions of a meeting to the public, may be changed following the public announcement required by paragraph (d)(1) of this section only if: (i) A majority of the entire membership of the Commission determines by a recorded vote that Commission business so requires and that no earlier announcement of the change was possible, and (ii) the Secretary publicly announces such change and the vote of each member on such change at the earliest practicable time.
(5) Immediately following each public announcement required by this section, notice of the time, place, and subject matter of a meeting, whether a portion or portions of the meetings are open or closed to public observation, any change in one of the preceding, and the name and business telephone number of the official of the Commission who will respond to requests for information about the meeting, shall be submitted for publication in the Federal Register.
(e) Closing a portion or portions of a meeting. (1) All Commission meetings shall be open to the public except when the Commission determines that public disclosure of information to be discussed in a portion or portions of a meeting is likely to:
(i) Disclose matters that are (A) specifically authorized under criteria established by Executive order to be kept secret in the interests of national defense or foreign policy and (B) in fact properly classified pursuant to such Executive order;
(ii) Relate solely to the internal personnel rules and practices of the Commission;
(iii) Disclose matters specifically exempted from disclosure by statute [other than the Freedom of Information Act (5 U.S.C. 552), provided that such statute: (A) Requires that the matters be withheld from the public in such a manner as to leave no discretion on the issue, or (B) establishes particular criteria for withholding or refers to particular types of matters to be withheld;
(iv) Disclose trade secrets and commercial or financial information obtained from a person and privileged or confidential;
(v) Involve accusing any person of a crime, or formally censuring any person;
(vi) Disclose information of a personal nature when disclosure would constitute a clearly unwarranted invasion of personal privacy;
(vii) Disclose investigatory records compiled for law-enforcement purposes, or information which, if written, would be contained in such records. But only to the extent that the production of such records or information would: (A) Interfere with enforcement proceedings, (B) deprive a person of a right to a fair trial or to an impartial adjudication, (C) constitute an unwarranted invasion of personal privacy, or (D) disclose the identity of a confidential source, and, in the case of a record compiled by a criminal law-enforcement authority in the course of a criminal investigation or by an agency conducting a lawful national-security intelligence investigation, confidential information furnished only by the confidential source:
(viii) Disclose information the premature disclosure of which would be likely to significantly frustrate implementation of a proposed Commission action except: (A) When the Commission has already disclosed to the public the content or nature of its proposed action or (B) when the Commission is required by law to make such disclosure on its own initiative prior to taking final Commission action on such proposal;
(ix) Specifically concerns the Commission's participation in a civil action or proceeding.
(2) In each instance where the Commission determines that a portion or portions of a meeting may be closed to the public, or determines that information may be withheld from the public for one or more of the exemptions listed in paragraph (e)(1) of this section, the Commission shall consider and determine whether or not the public interest requires that the portion or portions of the meeting be open to the public and whether or not the public interest requires that the information be released to the public.
(3) Whenever any person whose interest may be directly affected by a portion of a meeting requests that the Commission close such portion to the public for any of the reasons referred to in paragraph (e)(1) (v), (vi) or (vii) of this section, the Commission, upon the request of any one of its members, shall vote by recorded vote whether to close such meeting.
(4) Action to close a portion or portions of a meeting for one or more of the reasons listed in paragraphs (e)(1) (i) through (ix) of this section, or to withhold information from the public for one or more of the reasons listed in paragraphs (e)(1) (i) through (ix) of this section shall be taken only when a majority of the entire membership of the Commission votes to take such action.
(5) A separate recorded vote of the Commission shall be taken with respect to each meeting a portion or portions of which the Commission proposes to close to the public, and a separate vote of the members of the Commission shall be taken to determine whether to withhold information from the public. The vote of each Commissioner participating in such vote shall be recorded and no proxies shall be allowed.
(6) Within one day of any vote taken pursuant to paragraphs (e)(4) and (e)(5) of this section, the Commission shall make publicly available a written copy of such vote reflecting the vote of each member on the question. If a portion or portions of a meeting are to be closed to the public, the Commission shall within one day of the vote taken pursuant to paragraphs (e)(4) and (e)(5) of this section make publicly available a written explanation of its action in closing a portion or portions of the meeting together with a list of all persons expected to attend the meeting and their affiliations.
(7) For every portion or portions of a meeting closed pursuant to paragraphs (e)(1) (i) through (ix) of this section, the Chief Legal Officer of the Commission shall publicly certify that, in his or her opinion, the meeting may be closed to the public and shall state each relevant exemptive provision. A copy of such certification, together with a statement from the presiding officer of the meeting setting forth the time and place of the meeting, and the persons present, shall be retained in the Commission files.
(f) Records. (1) The Secretary shall maintain in the official files:
(i) A complete transcript or electronic recording (disclosing the identity of each speaker) adequate to record fully the proceedings of the Commission at a portion or portions of a meeting closed to the public for the reasons specified in paragraphs (e)(1) (i) through (ix) of this section.
(ii) The statement of the presiding officer of each Commission meeting, a portion or portions of which were closed to the public, as required by paragraph (e)(7) of this section.
(iii) The certification of the Chief Legal Officer, as required by paragraph (e)(7) of this section, for each Commission meeting, a portion or portions of which were closed to the public.
(2) The records required by paragraph (f)(1) of this section shall be retained for at least two years following any meeting or not less than one year following conclusion of Commission action with respect to any matter discussed at such meeting, whichever occurs later.
(g) Public access to records. (1) All records required to be maintained in accordance with the provisions of (f)(1) of this section shall promptly be made available to the public by the Secretary except for information which the Commission has determined may be withheld from the public for the reasons stated in paragraphs (e)(1) (i) through (ix) of this section.
(2) Public inspection of such records shall take place at the headquarters of the Mississippi River Commission, 1400 Walnut Street, Vicksburg, Mississippi 39180.
(3) The Secretary shall provide (subject to withholding of information for the reasons stated in paragraphs (e)(1) (i) through (ix) of this section) upon request of any person, copies of the records required by the provisions of (f)(1) of this section, including transcriptions of electronic recordings at the actual cost of transcription or duplication.
(5 U.S.C. 552b)
[42 FR 13286, Mar. 10, 1977]
§ 209.138a Authorization for exploratory drilling in the Gulf of Santa Catalina, Calif.
(a) Department of the Army authorization is required pursuant to section 4(f) of the Outer Continental Shelf Lands Act of 1953 (67 Stat. 462; 43 U.S.C. 1333(f)) in coastal waters and the water covering the Outer Continental Shelf. The determination whether or not to issue a Department of the Army authorization for structures on the Outer Continental Shelf related to exploration of minerals is based upon the proposed activities' effect on navigation and national security. All other matters concerning offshore drilling, including environmental considerations, are the responsibility of the Department of the Interior.
(b) The following rules have been developed jointly by the Los Angeles district engineer and the 11th Coast Guard District, in consultation with the Bureau of Land Management and the U.S. Geological Survey for drilling in the Gulf of Santa Catalina:
(1) All drilling with a single tract will be covered by a single application.
(2) Where practicable, applications shall be submitted at least 120 days in advance of drilling for tracts where drilling is expected to be accomplished within the traffic separation scheme, the precautionary zone or within 2 nautical miles of a traffic lane.
(3) Applications shall include the location of any known proposed drilling site and the estimated start and completion dates for each. Updated information on the plan shall be furnished as soon as available. One individual (and alternate) shall be designated by the applicant as responsible for maintaining close liaison with all involved agencies.
(4) Where it is not feasible to perform exploratory work from outside the traffic lanes or 1/4 mile buffer zones, or precautionary zone, authorizations will include the following conditions:
(i) Exploratory vessels within a traffic lane will, to the degree practicable, be sited near traffic lane boundaries.
(ii) Exploratory vessels within one traffic lane, or in the precautionary zone, shall be separated by at least 8 nautical miles in the direction of the lane axis.
(iii) Exploratory vessels located within the traffic lanes, or the precautionary zone, shall not have their pendant buoys within 3,000 yards from the pendant buoys of any other vessel.
(iv) Exploratory rigs and vessels engaged in offshore development may have no cables, anchors, buoys, or other associated equipment within the traffic lanes, 1/4 mile buffer zones, or the precautionary zone, at a depth of less than 100 feet, unless such equipment is marked with class I private aids to navigation in accordance with current Federal regulations.
(67 Stat. 462 (43 U.S.C. 1333(f))
[43 FR 28475, June 30, 1978]
§ 209.140 Operations of the Corps of Engineers under the Federal Power Act.
(a) General. This section outlines policies and procedures applicable to those operations in which the Corps of Engineers may be called upon to participate under the Federal Power Act. Such operations include: Investigations and reports on applications for permits and licenses for development of power affecting navigable waters; supervision of investigations, construction, and operation of projects under such permits and licenses; preparation of special reports as required by the Federal Power Commission; and review of plans of dams or other structures affecting navigation. The foregoing functions are performed by the Corps of Engineers only upon request of the Federal Power Commission.
(b) Authority of Division and District Engineers. Section 2 of the revised Federal Power Act provides that the Federal Power Commission may request the President to detail an officer or officers from the Corps of Engineers, or other branches of the United States Army, to serve the Commission as Engineer officer or officers, or in any other capacity, in field work outside the seat of government, their duties to be prescribed by the Commission. By authority of the Secretary of the Army, and in accordance with the instructions issued by the President in a letter to the Secretary of the Army dated May 18, 1931, Division Engineers will be detailed to serve the Commission as engineer officers in field work outside the seat of government, their duties to be prescribed by the Commission, and to be performed under the supervision of the Chief of Engineers. District Engineers will be designated to carry out the field inspections and investigations under supervision of the Division Engineer. When a Division Engineer is detailed by the Chief of Engineers to assist the Commission in either the investigation or supervision of a project he will be the accredited representative of the Commission. The actual field work will be done by the designated District Engineer who will make a report to the Division Engineer. All reports and such correspondence as would normally be forwarded to the Commission will be addressed to the Chief of Engineers.
(c) Procedure for investigations and report on applications for permits and licenses. (1) Upon request by the Federal Power Commission, the Chief of Engineers will assign the investigation of an application for permit or license under the Federal Power Act to a Division Engineer, who will submit a report on the investigation as provided herein. The date that the report is to be submitted will be specified. The Division Engineer, upon assignment of an investigation involving extensive studies, will when requested by the Chief of Engineers submit an estimate of the cost of the investigation, listing the probable expenditures for salaries separate from the estimated costs of non-personal services.
(2) If in the investigation of an application or a declaration of intention filed under the Federal Power Act the Division Engineer considers a public hearing desirable in the interests of navigation or flood control, the Chief of Engineers will be notified whereupon the matter will be brought to the attention of the Commission. No public hearing will be held unless specifically authorized by the Commission or by the Chief of Engineers. If a hearing is authorized it will be limited strictly to consideration of the purpose for which approval is granted.
(3) The report will describe and discuss material facts having a definite bearing on the interests of navigation and flood control and the general effect the project would have on a comprehensive plan of developing the water resources of the basin. Specific reference will be made to pertinent published documents containing the results of studies and/or resolutions directing studies to be made. In the case of an application for permit or license for an unconstructed project the report will include a recommendation as to whether development should be undertaken by the United States rather than by a licensee. A recommendation for Federal development will be supported by a showing as to how this would serve the Corps of Engineers programs and policies. In the case of an application for permit or license for a constructed project the report should contain appropriate comments concerning possible redevelopment to improve the usefulness of the project in relation to the objectives of the Corps program in the basin.
(4) The report on an application for license will contain recommendations of the Division Engineer concerning the inclusion in the license of any terms and conditions that are considered to be necessary or desirable in the public interest from the standpoint of Corps of Engineers responsibilities.
(5) The report on an application for permit will contain such recommendations as required to insure coordination of the applicant's studies with the Division or District Engineer in cases where interests of the Corps of Engineers are involved. In all cases, the report will contain, in lieu of specific recommendations, a discussion of interests which should be protected by articles in a license issued subsequent to the permit period.
(6) If the project is on a Federal reservation or contemplates the use of a dam, either of which is under the jurisdiction of the Department of the Army, the report should state, giving reasons:
(i) Whether the project will interfere or be inconsistent with the purpose for which such reservation was created or acquired and what conditions, if any, should be imposed for the adequate protection and utilization of the reservation.
(ii) Whether the dam may be advantageously used by the United States for public purposes in addition to authorized purposes and whether it should be reserved for such use.
(iii) Whether the development should be undertaken by the United States.
(7) The reports will not be released or made public except by specific authority of the Chief of Engineers, nor will copies of a report, its findings, or recommendations be furnished to the applicant, to interested parties, or to the Commission until released by the Chief of Engineers.
(d) Procedure for supervision of operations under permits and licenses. (1) When supervision of the operations of an applicant under a permit or a license is requested by the Federal Power Commission, the Chief of Engineers will assign responsibility for supervision to the Division Engineer. The operations to be supervised, such as investigations being conducted by a permittee, construction of a project under a license or operation of completed projects, will be as specified by the Commission.
(2) Projects will be classified as major, minor, minor part or transmission line projects as indicated in the Federal Power Act and as specified in the instructions from the Commission.
(3) Inspection during the construction of a major project will be made monthly, or as often as may be necessary for the Division Engineer to assure himself that the terms of the license are being complied with and the work is of acceptable quality and in accordance with the approved plans. The frequency of inspections of minor, minor part, and transmission line projects is left to the discretion of the Division Engineer.
(4) After a project has been completed and placed in operation and is under the supervision of the Division Engineer, annual inspection will be made of major and minor projects but inspection of transmission line projects will not be made unless specifically requested by the Commission.
(5) Reports on supervision and inspections of operations under Federal Power Commission permits and licenses will be submitted in accordance with instructions in paragraph (e) of this section.
(e) Reports on supervision and inspection of operations under Federal Power Commission permits licenses. Periodic reports, as appropriate to assigned responsibilities and as described in paragraphs (e) (1) through (3), inclusive, of this section will be submitted for each Federal Power Commission permit or license for which a Division Engineer has been assigned responsibility for supervision of operations under provisions of the Federal Power Act. All of the described reports will be submitted in triplicate to the Chief of Engineers for transmittal to the Federal Power Commission. Unless otherwise stated transmittal letters will not be required and the reports will be mailed so as to reach the Chief of Engineers not later than the 15th of the month following the end of the report period.
(1) Reports on supervision of construction under a FPC License. When a Division Engineer is assigned responsibility for supervision and inspection of construction of a licensed project, the requirements for submission of reports will be specified.
(2) Annual Report on operation of project under supervision of the Division Engineer. Reports on the operation and maintenance of each major and minor licensed project for which supervision of operations has been assigned to a Division Engineer will be submitted annually after the initial installation covered by the license has been completed. Such reports will be made on Federal Power Commission Form 10, “Operation Report” and, pursuant to paragraph 39u of AR 335-15, do not require a reports control symbol. A special report will be made in case of severe flood or interruption in operation due to failure of material or accident. Reports on operation and maintenance of transmission line projects are not required unless requested by the Commission.
(3) Annual Report on operation of projects with licenses containing conditions prescribed in the interest of navigation. When the Federal Power Commission notifies the Chief of Engineers that it will assume the supervision of operation of a licensed project, the Division Engineer will not be required to make detailed inspections and reports. However, the Division Engineer will continue to be responsible for the project insofar as it affects the interest of navigation. The inspection of projects in this class is left to the discretion of the Division Engineer but annual reports will be submitted in triplicate, through the Chief of Engineers, on Federal Power Commission Form 10, “Operation Report”, omitting the items under “Supervision expense for period”, but including the following information only under “Memorandum Report”.
(i) Whether the operation of the project has been satisfactory insofar as the interests of navigation are concerned.
(ii) Whether any infraction by the licensee of the conditions in the interest of navigation has come to the attention of the Division Engineer.
(f) Delegation of authority for approval of structural plans for non-Federal hydroelectric projects affecting navigation. The authority vested in the Secretary of the Army by section 4(e) of the Federal Power Act is hereby delegated to the Chief of the Engineers for promulgation with regard to approval of plans of structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric projects.
(Sec. 4(e), 49 Stat. 840; 16 U.S.C. 797(e); Secretary of the Army memorandum for the Chief of Engineers, dated March 11, 1975)
[33 FR 18670, Dec. 18, 1968, as amended at 40 FR 17023, Apr. 16, 1975]
Cross Reference:
For regulations of the Federal Energy Regulatory Commission, see 18 CFR chapter I.
§ 209.141 Coordination of hydroelectric power operations with power marketing agencies.
(a) Purpose. This regulation establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric generating facilities with the power marketing agencies.
(b) Applicability. This regulation applies to all civil works field operating agencies (FOA) having generating facilities producing marketable electric power.
(c) References. (1) Section 5, Pub. L. 534, 78th Congress, Flood Control Act of 1944, December 22, 1944 (58 Stat. 889).
(2) Section 302, Pub. L. 95-91, 95th Congress, Department of Energy Organization Act, August 4, 1977 (91 Stat. 565).
(d) Background. Section 5 of the Act of December 22, 1944 (Pub. L. 534, 78th Congress), provides that electric power and energy generated at reservoir projects under the control of the Department of the Army and in the opinion of the Secretary of Army not required in the operation of such projects shall be delivered to the Secretary of Interior for transmittal and disposal in a manner to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles. Section 302 of the Department of Energy Organization Act (Pub. L. 95-91) transfers all functions of the Secretary of Interior under section 5 of the 1944 Act to the Secretary of Energy together with all other functions of the Secretary of Interior, and officers and components of the Department of the Interior, with respect to the Southeastern Power Administration; the Southwestern Power Administration; the Alaska Power Administration; the Bonneville Power Administration; and the power marketing functions of the Bureau of Reclamation.
(e) Policies. (1) The Corps is responsible for operating the hydroelectric power projects and providing information affecting cost and availability of power to the power marketing agencies. Marketing the generated power declared excess to the needs of the projects and recovering Federal investment are the responsibilities of the power marketing agencies.
(2) All FOA Commanders will develop, in coordination with their respective power marketing agency, a system for exchanging operating information. The system will include general operating information and information on conditions that could substantially affect costs or power availability.
(f) Delegation. Responsibility for coordinating the exchange of information may be delegated to the District Engineer at the discretion of the Division Engineer.
(g) Procedures—(1) Specific requirements—(i) Continuing. Prompt written notification will be provided to the appropriate power marketing agency each time a change in power operations or conditions which could substantially affect costs or power availability is anticipated.
(ii) Annual. Annually, when no changes in power operations or costs are expected for the succeeding 12-month period, the marketing agency will be notified of that fact in writing.
(2) FOA responsibility. The FOA directly responsible for communicating with the marketing agency will develop appropriate reporting procedures in coordination with that agency.
[43 FR 8258, Mar. 1, 1978]
§ 209.155 Expenditure of Federal funds for work shoreward of harbor lines.
(a) Section 5 of the River and Harbor Act of July 13, 1892 (27 Stat. 111; 33 U.S.C. 628), prohibits the expenditure of money appropriated for the improvement of rivers and harbors for dredging inside of harbor lines duly established.
(b) It is not the policy of the Department to expend Federal funds for the removal of wrecks or other obstructions shoreward of established harbor lines.
§ 209.160 The California Debris Commission.
Section 1 of the Act of Congress of March 1, 1893 (27 Stat. 507; 33 U.S.C. 661), created the California Debris Commission, consisting of three officers of the Corps of Engineers, to regulate under the supervision of the Chief of Engineers and direction of the Secretary of the Army, hydraulic mining in the territory drained by the Sacramento and San Joaquin River systems, California. Under section 9 of the act (27 Stat. 508; 33 U.S.C. 669), the individual proprietor or proprietors, or in case of a corporation, its manager or agent appointed for that purpose, owning mining ground in this territory which it is desired to work by the hydraulic process, must file with the Commission a verified petition, setting forth such facts as will comply with law and the rules prescribed by the Commission. The law contains detailed instructions with regard to facts required to be shown by the petitioner and the procedure to be followed by the Commission in issuing an order directing the methods and specifying the manner in which operations shall proceed. Full information on law and procedure can be obtained from the Secretary, California Debris Commission, 650 Capitol Mall, Sacramento, California 95814.
§ 209.170 Violations of laws protecting navigable waters.
(a) [Reserved]
(b) Injuries to Government works. Section 14 of the River and Harbor Act of March 3, 1899 (30 Stat. 1152; 33 U.S.C. 408), makes it unlawful for any person or persons to take possession of or make use of for any purpose, or build upon, alter, deface, destroy, move, injure, obstruct by fastening vessels thereto or otherwise, or in any manner whatever impair the usefulness of any sea wall, bulkhead, jetty, dike, levee, wharf, pier, or other work built by the United States, or any piece of plant, floating or otherwise, used in the construction of such work under the control of the United States, in whole or in part, for the preservation and improvement of any of its navigable waters or to prevent floods, or as boundary marks, tide gauges, surveying stations, buoys, or other established marks, nor remove for ballast or other purposes any stone or other material composing such works. (The Secretary of the Army may, on the recommendation of the Chief of Engineers, grant permission for the temporary occupation or use of any of the aforementioned public works when in his judgment such occupation or use will not be injurious to the public interest).
(c) Injurious deposits. (1) Section 13 of the River and Harbor Act of March 3, 1899 (30 Stat. 1152; 33 U.S.C. 407), makes it unlawful to throw, discharge, or deposit, or cause, suffer, or procure to be thrown, discharged, or deposited either from or out of any ship, barge, or other floating craft, or from the shore, wharf, manufacturing establishment, or mill, any refuse matter of any kind or description whatever other than that flowing from streets and sewers and passing therefrom in a liquid state, into any navigable water of the United States, or into any tributary of any navigable water from which the same shall float or be washed into such navigable water, or to deposit or cause, suffer, or procure to be deposited material of any kind in any place on the bank of any navigable water or on the bank of any tributary of any navigable water, where the same shall be liable to be washed into such navigable water, either by ordinary or high tides, or by storms or floods, or otherwise, whereby navigation shall or may be impeded or obstructed. Section 13 does not apply to the operations in connection with the improvement of navigable waters or construction of public works considered necessary and proper by the United States officers supervising such improvement or public work.
(2) An Act of Congress approved June 29, 1888 (25 Stat. 209; 33 U.S.C. 441-451), as amended on August 28, 1958 (72 Stat. 970-971; 33 U.S.C. 441-451b) forbids the placing, discharging, or depositing of refuse, dirt, ashes, cinders, mud, sand, dredgings, sludge, acid, or any other matter of any kind, other than that flowing from streets, sewers, and passing therefrom in a liquid state, in the tidal waters of the harbors of New York, Hampton Roads, and Baltimore or its adjacent or tributary waters, within the limits which shall be prescribed by the Supervisor of the Harbor. The provisions of this act are enforced by the Supervisor under the direction of the Secretary of the Army.
(d) Penalties for violations. (1) Section 12 of the River and Harbor Act of March 3, 1899 (30 Stat. 1151; 33 U.S.C. 406), as amended, provides that every person and every corporation that shall violate any of the provisions of sections 9 and 10 shall be deemed guilty of a misdemeanor, and on conviction thereof shall be punished by fine, imprisonment, or both, in the discretion of the court. The removal of any structures or parts of structures erected in violation of the provisions of the said sections may be enforced by the injunction of any district court exercising jurisdiction in any district in which such structures may exist, and proper proceedings to this end may be instituted under the direction of the Attorney General.
(2) Section 16 of the River and Harbor Act of March 3, 1899 (30 Stat. 1153; 33 U.S.C. 412), provides that every person and every corporation that shall violate, or that shall knowingly aid, abet, authorize or instigate a violation of the provisions of sections 13, 14 and 15, shall be guilty of a misdemeanor. On conviction thereof violators shall be punished by a fine, imprisonment, or both, in the discretion of the court. Any master, pilot, and engineer, or person or persons acting in such capacity, respectively, on board of any boat or vessel who shall knowingly engage in towing any scow, boat, or vessel loaded with any material specified in section 13 to any point or place of deposit or discharge in any harbor or navigable water, elsewhere than within the limits defined and permitted by the Secretary of the Army, or who shall willfully injure or destroy any work of the United States contemplated in section 14, or who shall willfully obstruct the channel of any waterway in the manner contemplated in section 15, shall be deemed guilty of a violation of the Act. Upon conviction he shall be punished as provided in this section, and shall also have his license revoked or suspended for a term to be fixed by the judge before whom tried and convicted. Any boat, vessel, scow, raft, or other craft used or employed in violating any of the provisions of sections 13, 14, and 15 shall be liable for the pecuniary penalties specified in this section, and in addition for the amount of the damages done by said boat, vessel, scow, raft, or other craft. The latter sum shall be placed to the credit of the appropriation for the improvement of the harbor or waterway in which the damage occurred, and said boat, vessel, scow, raft, or other craft may be proceeded against summarily by way of libel in any district court of the United States having jurisdiction thereof.
(e) Enforcement. (1) Section 17 of the River and Harbor Act of March 3, 1899 (30 Stat. 1153; 33 U.S.C. 413) provides that the Department of Justice shall conduct the legal proceedings necessary to enforce the provisions of sections 9 to 16, inclusive, of the Act. It shall be the duty of district attorneys of the United States to prosecute vigorously all offenders against the same whenever requested to do so by the Secretary of the Army or by any of his designated representatives.
(2) Under the provisions of section 17, District Engineers and the United States collectors of customs and other revenue officers, have power and authority to swear out process and to arrest and take into custody, with or without process, any person or persons who may commit any of the acts or offenses prohibited by sections 9 to 16, inclusive, or who may violate any of the provisions of the same. No person shall be arrested without process for any offense not committed in the presence of some one of the aforesaid officials. Whenever any arrest is made under the provisions of the Act, the person so arrested shall be brought forthwith before a commissioner, judge, or court of the United States for examination of the offenses alleged against him. Such commissioner, judge, or court shall proceed as authorized by law in case of crimes against the United States.
(3) It is the duty of each District Engineer to take notice of any violations of the laws for the protection of the navigable waters and the works of improvement therein that may occur in his district and to take the necessary steps to secure enforcement of the law. Whenever any violation of any of these provisions of law comes to his attention he will investigate carefully the circumstances of the case and will determine the amount of the damage for which the parties committing the violation are responsible under section 16 of the River and Harbor Act of March 3, 1899. He will advise the responsible parties to remove the illegal structure or deposit or to repair the damage at their own expense within a time specified by him. When there is reasonable doubt as to legal liability or the facts do not appear to warrant legal action, the District Engineer will report the case to the Chief of Engineers for decision before communicating with the responsible parties. When the damage must be repaired within a reasonable time, if the responsible parties so request in writing and if, when considered advisable by the District Engineer to protect the interests of the United States, they furnish a satisfactory bond or other guaranty, he may cause the repairs to be made by employees of the United States and then call upon the responsible parties to pay over to him the cost of the damages when finally ascertained. Where the damage is not to be repaired within a reasonable time, the District Engineer will make final settlement with the responsible parties as promptly as possible by collecting the estimated amount of the damages. All sums so received will be deposited promptly to the credit of the Treasurer of the United States for recredit to the appropriation affected and will be accounted for in the District Engineer's money accounts by proper vouchers. With reference to the method of ascertaining the amount of the damages under section 16 of the Act, a distinction should be made between cases involving property that should be repaired and those involving property that should be abandoned. In the former cases the amount of the damages should be the total cost of repairs, less any salvage value and any enhanced value. In the latter cases, the amount of the damages should be the fair value of the property, less any salvage value. Whether or not there has been any enhanced value (i.e., whether the fair value of the structure immediately after the repairs is greater than its fair value immediately before the damage occurred) is a matter to be determined from an actual survey of the structure and knowledge of its age and condition. Where maintenance has equalled depreciation there probably would be no enhanced value.
(4) If the parties deny their responsibility, or if they refuse or neglect to remove any unlawful structure or deposit or to repair the damages within the time specified by the District Engineer, the matter will be reported to the Chief of Engineers with such evidence as the District Engineer may be able to obtain and his recommended action under section 17 of the Act of March 3, 1899. In a situation requiring immediate action, the District Engineer may report the case directly to the U.S. attorney for the district. The Chief of Engineers will be advised of such action by a written report. Although the Corps of Engineers has certain police powers under this Act it has been the long standing policy to secure compliance with its provisions short of legal proceedings. Accordingly every effort will be made to accomplish corrective measures prior to initiation of action leading to such proceedings. As a general rule, while minor and unintentional or accidental violations of the provisions of the Act need not be reported to the Chief of Engineers, all willful or intentional violations and all cases in which the parties responsible refuse or neglect to remove the unlawful structure or deposit or to make good the damages suffered should be reported promptly to the Chief of Engineers in accordance with the above. It is the policy not to recommend prosecution when the violation of law is trivial, apparently unpremeditated, and results in no material public injury. Each report recommending prosecution should be accompanied by a full statement of the case and copies of correspondence relating thereto.
(5) The procedure in cases involving injurious deposits is similar to that described for other violations of law except that as the damage caused thereby cannot be repaired readily there will be no reason for serving any notice on the parties responsible for the violations further than to bring to their attention the consequences thereof.
(6) Section 6 of the river and Harbor Act approved March 3, 1905 (33 Stat. 1148; 33 U.S.C. 417) provides that expenses incurred by the Corps of Engineers in all investigations, inspections, hearings, reports, service of notice, or other action incidental to examinations into alleged violations of laws for protection and preservation of navigable waters shall be payable from any funds which may be available for the improvement, maintenance, operation, or care of the waterways or harbors affected. If such funds are not available in sums judged by the Chief of Engineers to be adequate, they shall be payable from any funds available for examinations, surveys, and contingencies of rivers and harbors.
[33 FR 18670, Dec. 18, 1968, as amended at 36 FR 17855, Sept. 4, 1971; 51 FR 45765, Dec. 22, 1986; 53 FR 27512, July 21, 1988]
§ 209.180 Temporary closure of waterway to navigation.
(a) When an application is received for the temporary closure of a waterway for the construction of a structure or the performance of other work in the waterway, the District Engineer will assure himself of the necessity for the closure and arrange after informal communication with any important navigation interests concerned the time and duration of the closure which will enable the operations to be completed with the least interference with navigation. If there is no question as to the necessity and propriety of the closure, the District Engineer is authorized to inform the applicant as follows: “The Department of the Army will interpose no objection to the closure for a stated period beginning at a specified date: Provided, That prior thereto the applicant will notify navigation interests by an advertisement in the press or otherwise as the District Engineer may approve and on the understanding that the waiver of objection does not affect the liability of the applicant for any damages that may arise by reason of the closure.” The letter to the applicant will be signed “By Authority of the Secretary of the Army” and distribution made as prescribed for permits.
(b) District Engineers will give careful consideration to the effect of any closure on through navigation. Should coordination with other districts be necessary the case will be forwarded to the Division Engineer for such coordination.
(c) Cases not falling within the authority above conferred will be forwarded to the Chief of Engineers with the recommendations of the Division and District Engineers.
§ 209.190 [Reserved]
§ 209.200 Regulations governing navigable waters.
(a) Publication of regulations. (1) Regulations prescribed by or under the direction of the Secretary of the Army to govern navigation and navigable waters, are contained in the Code of Federal Regulations, title 33, Navigation and Navigable Waters, Chapter II.
(2) District engineers (or division engineers if considered preferable by the latter to avoid duplication in cases where the regulations involved apply to more than one district) will distribute copies of departmental regulations to all known interested parties as soon as their publication has been noted in the Federal Register. In the case of regulations applicable to more than one division, distribution will be handled as agreed upon by the division engineers concerned. Under the Administrative Procedure Act (5 U.S.C. 551-553), publication in the Federal Register shall be not less than 30 days prior to the effective date except as otherwise provided upon good cause found and published with the regulations.
(b) Navigation regulations. (1) Section 7 of the River and Harbor Act approved August 8, 1917 (40 Stat. 266; 33 U.S.C. 1) authorizes the Secretary of the Army to prescribe such regulations for the use, administration, and navigation of the navigable waters of the United States as public necessity may require for the protection of life and property, or for operations of the United States in channel improvement, covering all matters not specifically delegated by law to some other executive department. The statute provides for the posting of regulations and punishment for violations.
(2) Section 6 of the River and Harbor Act approved June 13, 1902 (32 Stat. 374; 33 U.S.C. 499) provides that regulations prescribed by the Secretary of the Army may be enforced as provided in section 17 of the River and Harbor Act approved March 3, 1899 (30 Stat. 1153; 33 U.S.C. 413).
(3) District Engineers will take action with respect to regulations prescribed for waterways under their jurisdiction:
(i) To insure that the regulations are brought to the attention of the public.
(ii) To insure that the regulations are properly and fairly administered.
(iii) To recommend any revisions necessary to permit full use of the waterway by the public.
(c) Danger zones. (1) The Secretary of the Army has authority to prescribe regulations for the use and navigation of any area of the navigable waters of the United States or waters under the jurisdiction of the United States likely to be endangered by Department of Defense operations. This authority is pursuant to the provisions of Chapter XIX of the Army Act of July 9, 1918, or of section 7 of the River and Harbor Act of August 8, 1917.
(2) On receipt of a request from any element of the Department of Defense or other agency for approval by the Secretary of the Army of regulations establishing danger zones under authority of either Act, the District Engineer will, prior to issuing any public notice, make certain that the applicant: (i) Has coordinated its proposed operations with any operations being conducted or contemplated by other agencies in the same area with a view to avoiding interagency conflicts, (ii) has obtained clearance from the proper Regional Subcommittee on Airspace, Rules of the Air and Air Traffic Control (Air Coordinating Committee), where the use of airspace is involved, and (iii) has conducted preliminary discussions with local interests when considered advisable. In the case of proposed danger zones off the Atlantic and Pacific Coasts, the coordination referred to in (c)(2)(i) of this section will include the Commander, Service Force, U.S. Atlantic Fleet, or the Commander, Western Sea Frontier.
(3) The authority to prescribe danger zone regulations must be exercised so as not to interfere with or restrict unreasonably the food fishing industry. Whenever the establishment of a proposed danger zone or restricted area may affect fishing operations the District Engineer will consult with the regional director, U.S. Fish and Wildlife Service, Department of the Interior. Two copies of all notices of applications for the establishment of danger zones and restricted areas will be forwarded to the Chief of Staff, U.S. Air Force. In addition, notices of all applications relating to the establishment of aerial gunnery and bombing areas will be sent to local Army, Navy, and Federal Aviation Agency representatives.
(4) If the use of water areas is desired only for such temporary, occasional, or intermittent periods that operations can be conducted safely without imposing restrictions on navigation, applicants may be informed that formal regulations by the Secretary of the Army are not required. However, proper notices for mariners requesting that vessels avoid the areas will be issued by the District Engineer to all interested persons. Copies will be sent to the Commandant, U.S. Coast Guard, Washington, D.C. 20226 and the Commander, U.S. Naval Oceanographic Office, Washington, D.C. 20390.
(d) Dumping grounds. (1) Section 4 of the River and Harbor Act of March 3, 1905 (33 Stat. 1147; 33 U.S.C. 419), authorizes the Secretary of the Army to prescribe regulations to govern the transportation and dumping into any navigable water, or waters adjacent thereto, of dredgings and other refuse materials whenever in his judgment such regulations are required in the interest of navigation.
(2) Section 13 of the river and Harbor Act of March 3, 1899 (30 Stat. 1152; 33 U.S.C. 407) authorizes the Secretary of the Army to permit the deposit of refuse matter in navigable waters, whenever in the judgment of the Chief of Engineers anchorage and navigation will not be injured thereby, within limits to be defined and under conditions to be prescribed by him. Although the Department has exercised this authority from time to time, it is considered preferable to act under Section 4 of the River and Harbor Act of March 3, 1905 (33 Stat. 1147; 33 U.S.C. 419). As a means of assisting the Chief of Engineers in determining the effect on anchorage of vessels, the views of the U.S. Coast Guard will be solicited by coordination with the Commander of the local Coast Guard District.
(3) Under the authority contained in an Act of Congress to prevent obstructive and injurious deposits within the harbor and adjacent waters of New York City of June 29, 1888 (25 Stat. 209; 33 U.S.C. 441), the Supervisor of New York Harbor has established dumping areas in those waters and has prescribed regulations for their use. The provisions of the act are enforced by the Supervisor under the direction of the Secretary of the Army.
(4) In considering requests for the establishment of dumping grounds, District and Division Engineers will give careful consideration to the requirements of navigation and will take action to prevent unreasonable injury to fish and wildlife.
(e) Public notice and consultation with interested parties. (1) When applications are received for the promulgation of regulations as outlined in paragraphs (b) through (f), inclusive, of this section, District Engineers will issue public notices to all parties deemed likely to be interested and specifically to the agencies referred to in these paragraphs. The notice should fix a limiting date within which comments will be received, normally a period not less than 30 days after the actual mailing of the notice. If time is an essential element when adequately explained by the applicant, the District Engineer is authorized to give interested parties a minimum of 10 days after receipt of the notice in which to present protests. A copy of every notice issued will be sent to the Chief of Engineers, Attention: ENGCW-ON.
(2) Copies of the notices sent to interested parties, together with a list of parties to whom sent, will accompany reports on all applications for promulgation of regulations submitted to the Chief of Engineers for necessary action.
(3) In all instances when response to a public notice has been received from a Member of Congress, the District Engineer will inform the Member of Congress of the final action taken on the application.
(f) Public hearings. (1) It is the policy of the Chief of Engineers to conduct his civil works activities in an atmosphere of public understanding, trust, and mutual cooperation and in a manner responsive to public needs and desires. To this end, public hearings are helpful and will be held whenever there appears to be sufficient public interest to justify such action. In case of doubt, a public hearing should be held.
(2) Among the instances warranting public hearings are general public opposition to the promulgation of regulations governing the use and navigation of navigable waters. District Engineers will notify the Division Engineer of the need for a hearing, state the proposed arrangements therefor and obtain his concurrence therein. Public hearings will be held in any case when Congressional interests or responsible local authorities make an official and valid request therefor and such action will fulfill the above-stated policy and objectives.
[33 FR 18670, Dec. 18, 1968, as amended at 51 FR 45765, Dec. 22, 1986; 52 FR 24157, June 29, 1987]
§ 209.220 Flood control regulations.
(a) Local protection works. On projects authorized subject to specified conditions of local cooperation, no construction is undertaken by the Department of the Army until satisfactory assurances of the required local cooperation have been accepted by the Secretary of the Army and until any lands, easements, and rights-of-way required to be furnished by local interests have been made available for at least a complete unit of the project. The District Engineers notify local interests concerned of the requirements of local cooperation and request assurances by registered mail prior to the preparation of final plans and specifications. Regulations prescribed by the Secretary of the Army for the maintenance and operation of local flood protection works are contained in § 208.10 of this chapter. When assurances satisfactory to the District Engineer are received, they are forwarded through the Division Engineer to the Chief of Engineers for consideration of the Secretary of the Army. The District Engineers advise local interests of the action taken by the Department. Completed projects or completed useful units thereof are normally turned over to local interests for maintenance and operation as soon as the construction and testing of equipment is completed and the project is in proper condition for the assumption of maintenance and operation by local interests. The transfer is accomplished by formal notice from the District Engineer to the local interests that the completed facilities are being turned over to them for maintenance and operation as of a specific date. During construction, District Engineers keep the local interests concerned advised as to the probable date of transfer.
(b) Use of storage allocated for flood control or navigation at reservoirs constructed wholly or in part with Federal funds. Regulations prescribed by the Secretary of the Army in accordance with section 7 of the Flood Control Act of December 22, 1944 (58 Stat. 890; 33 U.S.C. 709) are for the purpose of coordinating the operation of the flood control features of reservoirs constructed wholly or in part with Federal funds and other flood control improvements to obtain the maximum protection from floods which can reasonably be obtained with the proper operation of all flood control improvements. Proposed regulations are determined by the District Engineer in cooperation with the persons responsible for the maintenance and operation of the reservoir involved after a detailed study of the flood problems and the characteristics of the reservoir project. The proposed regulations are forwarded by the District Engineer through the Division Engineer to the Chief of Engineers for consideration of the Secretary of the Army. When approved by the Secretary of the Army, these regulations are published in part 208 of this chapter.
§ 209.230 Use of reservoir areas for recreation.
The Department of the Army in accordance with Section 4 of the Flood Control Act of December 22, 1944, as amended by section 4 of the Flood Control Act of July 24, 1946 (60 Stat. 641) prepares and administers plans to obtain the maximum sustained public benefit from the use of reservoir areas under its control for recreation and other related purposes, when such use is consistent with the operation and maintenance of the reservoir project for the specific purposes of the reservoir project as authorized by law and when such use is determined not to be contrary to the public interest. The plans are prepared and administered by the District Engineers, subject to review and approval of the Division Engineers and the Chief of Engineers, in close cooperation with other Federal agencies and local interests. The views and desires of these agencies and local interests are obtained normally by conferences with the District Engineers. In many cases, public hearings are held by the District Engineers at appropriate times in the vicinity of the reservoir area at which time anyone can express his views relative to these plans for consideration of the Department of the Army. Rules and regulations are prescribed by the Secretary of the Army to govern the public use of the reservoir areas in accordance with the law as a part of the master plan for recreational and related uses of the reservoir area. These rules and regulations are published in 36 CFR parts 311 to 326. Licenses and leases are granted under the law containing conditions and provisions to govern the use of specific portions of the reservoir area. Full information concerning such matters may be obtained from the District Engineer in charge of the reservoir.
§ 209.300 Flood control regulations.
(a) Regulations for the operation and maintenance of local flood protection works approved by the Secretary of the Army under the authority contained in Section 3 of the Flood Control Act of June 22, 1936, as amended and supplemented, are codified as § 208.10 of this chapter. These regulations cover conditions normally and regularly required. Whenever the regulations are not sufficiently broad to cover the specific maintenance and operation requirements of a particular project, District Engineers will submit through the Division Engineers recommended additional regulations needed for that particular project. Such supplemental regulations will require approval of the Secretary of the Army and will be made applicable only to the individual project concerned. Local interests will be advised of the approved regulations for operation and maintenance of local flood protection works at the time assurances of local cooperation are requested. District Engineers will keep informed as to the extent of compliance with approved regulations for operation and maintenance through regular, periodic inspection of the projects concerned and through careful analysis of the semiannual reports which the operating and maintaining agencies are required to submit in accordance with the regulations. The District Engineer's views as to any measures required to conform to the approved regulations will be furnished to the agencies responsible. In any case where the District Engineer has been unable to arrange satisfactory compliance or where there is question or disagreement as to the measures required for compliance, a report of the circumstances, together with the recommendations of the District and Division Engineers, will be submitted to the Chief of Engineers for consideration.
(b) Regulations for the use of storage allocated for flood control or navigation at reservoirs constructed wholly or in part with Federal funds provided on the basis of such purposes, are contained in § 208.16 et seq. of this chapter.
§ 209.310 Representation of submarine cables and pipelines on nautical charts.
(a) The policy of the Corps of Engineers with respect to showing the locations of submarine cables and pipelines on nautical charts published by the Corps of Engineers is as follows:
(1) Within protected waters such as harbors, rivers, bays, estuaries or other inland waterways the location of submarine cables and pipelines is to be indicated by shaded areas marked “Pipeline area” or “Cable area”. The extent of the limits of the area will be governed by local conditions but shall include the immediate area which overlies the cable or pipeline.
(2) Ordinarily, the shaded area on a chart which depicts a cable area or pipeline area should not exceed 500 feet on each side of the location of the cable or pipeline except on small scale charts where an area of that width would not be of sufficient prominence.
(3) The shaded area will be designated “cable area” or “pipeline area” as appropriate, but no other information as to the character or ownership of the installation will appear on the chart.
(b) District engineers will furnish copies of all permits issued for submarine cable and pipelines to the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service, ATTN: N/CG222, Rockville, MD 20852, with his/her recommendation of whether or not the installation should be shown on NOAA nautical charts. National Ocean Service must be notified of the commencement and completion dates for all permitted activities under this section. (Note: Decisions to publish these cables and pipelines on NOAA nautical charts lie solely within NOAA's discretion.)
[51 FR 45765, Dec. 22, 1986]
§ 209.315 Public access to navigation works.
While the regulations prescribed by the Secretary of the army for various navigation improvements usually strictly prohibit trespass on Government property, those regulations will not be construed as prohibiting access to navigation works of general public interest subject to the following criteria:
(a) The public will not be permitted in areas where their presence would subject themselves or Government operating personnel to serious accident hazards.
(b) The public will not be permitted in areas where their presence would interfere with any phases of navigation operations.
(c) The public will be given access to all areas other than those specified under paragraphs (a) and (b) of this section, subject only to the normal legal requirements with respect to property and personal rights.
§ 209.320 Policy on release of commercial statistics.
The collection of commercial statistics pertaining to rivers, harbors, and waterways, and annual reports thereof to Congress, are required by the River and Harbor Act of June 23, 1866 (14 Stat. 70), the act of February 21, 1891 (26 Stat. 766), the River and Harbor Act of June 13, 1902 (32 Stat. 376), the River and Harbor Act of July 25, 1912 (37 Stat. 201), the River and Harbor Act of September 22, 1922 (42 Stat. 1043), and Pub. L. No. 16, February 10, 1932 (47 Stat. 42). It is the policy of the Department to hold in strict confidence any data or information which has been furnished by shippers and others upon the understanding that it will not be disclosed and will only be used in the compilation of port or waterway statistics. In case Federal or State agencies or local interests request other than general information made permissible hereunder, their attention will be called to the policy indicated in this section.
§ 209.325 Navigation lights, aids to navigation, navigation charts, and related data policy, practices and procedure.
(a) Purpose. This regulation prescribes the policy, practice and procedure to be used by all Corps of Engineers installations and activities in connection with aids to navigation, chart data, and publication of information on Civil Works activities.
(b) This regulation will be applied by all elements of the Corps of Engineers with Civil Works responsibilities.
(c) Reference. Public Law 85-480, Publication Authority (72 Stat. 279).
(d) Cooperation with Coast Guard. (1) District Engineers will consult with the Coast Guard District Commander during design of channel and harbor improvement projects to discuss the aids to navigation requirements and all other facets of the projects that involve Coast Guard responsibility. Project material furnished direct to Coast Guard Commanders will include:
(i) Information as to the authorization by Congress of a project involving changes affecting aids, such as channel limits, breakwaters, including a copy of the project document;
(ii) The proposed operations on such projects during the next fiscal year, to be furnished annually on the release of the budget estimates;
(iii) Plans showing the final location of the channel limits or structures to be furnished at the time work is undertaken.
(2) Changes in channel limits affecting navigation aids, made under general or specific provisions of the law, should be made the subject of a conference with the Coast Guard District Commander. He will be promptly informed as to the approval of such changes and the probable date of completion of the work.
(3) District Engineers will furnish direct to the various Coast Guard District Commanders, for their immediate information, any facts which may come to their attention in connection with their duties which will be of benefit to the Coast Guard in maintaining its system of aids to navigation. This should include statements as to the displacement of or defects in any such aids to navigation.
(4) If work involving harbor or channel improvements directly affects any existing aids to navigation or any structures of the Coast Guard, Districts Engineers will, when practicable, give notice to the Coast Guard District Commander sufficiently in advance to permit taking such steps as may be deemed necessary by the Coast Guard. If the Coast Guard District Commander specifically requests that the affected structure be replaced, the District Engineer will inform him of the estimated cost and will proceed with the work if so authorized by the Chief of Engineers. On completion of the work, the District Engineer will promptly furnish the Coast Guard District Commander, for settlement, an account of the expense incurred.
(e) Navigation Aids of the Corps of Engineers. (1) Whenever channel dredging or other channel improvements are being performed, necessary temporary markers, such as ranges and light poles, should be installed and maintained by the District Engineer pending the installation of permanent aids by the Coast Guard. The Coast Guard desires that information regarding aids to navigation installed or maintained by District Engineers in connection with harbor or channel improvement be furnished promptly. Such information is needed for inclusion in Notice to Mariners as published by the Coast Guard, and where desirable on the charts of the waters concerned.
(2) District Engineers will notify the Coast Guard District Commander in every case where aids to navigation for marking works of harbor or channel improvements are established or discontinued. Notice should be given of such aids as may be of use or interest to general navigation. Notice need not be given as to such buoys, lights, or fog signals as are of temporary or unimportant character, or of importance only to the Corps of Engineers. Omit also lights or fog signals on ferry slips and on piers used only by certain vessels, and stakes, bushes, and barrel buoys marking shallow and little-used channels.
(3) In placing aids to navigation in connection with harbor or channel improvement works, District Engineers should see that they do not conflict in character or otherwise with other aids to navigation in the vicinity. District Engineers should confer with the Coast Guard District Commander on this subject.
(4) The necessary blank forms for reporting information regarding Corps of Engineers aids will be furnished upon request by the Coast Guard District Commander.
(5) It is essential that the Coast Guard by furnished with information for publication concerning markers installed by the Corps of Engineers as temporary aids to navigation, for new improvements, in advance of permanent aids, and also concerning other markers that may be established in connection with Corps of Engineers operations that may also serve as important aids to navigation. Care will be exercised to see that all markers established are not misleading to general navigation and do not interfere with aids to navigation established by the Coast Guard.
(f) Colors of dredging buoys established by Corps of Engineers. (1) In order to distinguish buoys placed and maintained by the Corps of Engineers for dredging purposes from aids to navigation placed by the Coast Guard, Corps buoys will be painted white with the top 2 feet painted light green.
(2) If buoys with special markings are needed to indicate the different sides of the navigable channel, prior arrangements will be made with the Coast Guard District Commander having jurisdiction.
(g) Information to be furnished by the Corps of Engineers. (1) District Engineers responsible for harbors and waterways shown on charts of the National Ocean Survey (NOAA), will report the channel conditions promptly, using standard tabular forms, to:
Director, Defense Mapping Agency, ATTN: Hydrographic Center, Washington, D.C. 20390. National Oceanic and Atmospheric Administration, ATTN: National Ocean Survey C-32, Rockville, Md. 20852. Commandant and District Commanders, U.S. Coast Guard.
(2) Channel survey drawings furnished to the Coast Guard are to include:
(i) Either NAD 27 or State Plane grids.
(ii) Plots of the positions of aids to navigation.
(iii) Written notations of the coordinates in NAD 27 or State Plane Coordinates of the fixed aids to navigation found during the survey.
(3) The standard tabular forms with illustrated data follow:
(i) For channels 400 feet wide and greater (ENG Form 4020-R).
(ii) For channels 100 to 400 feet wide (ENG Form 4021-R).
[ ________ Harbor, ________ (State)]
Name of channel | Date survey | Project | Minimum depths in channel entering from seaward
Feet width | Miles length | Feet depth | Left outside quarter feet | Mid-channel for half project width feet | Right outside quarter feet
Kings Island Channel | 3-78 | 300 | 1.14 | 26 | 24 | 23 | 26
Whitehall Channel | 3-78 | 200 | 1.81 | 26 | 27 | 26 | 25
ENG FORM 4021-R (Jul 59)
(iii) For channels less than 100 feet in width, report controlling depths only based on at least 80 percent of project width, 40 percent on either side of centerline. (The submission of tabular forms is not required for channels having a project depth less than 10 feet except coastal inlets and harbors of refuge.)
(4) The tabulations of depths should be amplified by footnotes or otherwise to show clearly and definitely the location of controlling shoals, tendency of shoals to recur, and all other critical information of special value and importance for safe navigation of the channel. Reaches of channel not presently named should be identified in the tabular form by reference to chartered aids or features, or assigned identifying names, numbers or letters. For localized irregular project areas where the application of the tabular form would not be practical, the controlling depth based on a safe navigable width will be described as well as unusual or critical conditions of shoaling.
(5) The prompt dissemination of the latest detailed information concerning channel conditions is of utmost importance, and necessary measures will be taken to insure that such information is reported without delay simultaneously to the U.S. Naval Oceanographic Office, the Coast Guard, the National Ocean Survey and Defense Mapping Agency. When a dangerous shoaling is found during the progress of a survey, information thereon will be furnished immediately to the above-mentioned agencies, so that such information may be made available to mariners promptly, and buoys shifted to mark the shoal. Descriptions of any dredging or other operations in important channels in tidal waters—either in progress and not already reported, or soon to be undertaken—together with a statement of the work and expected duration, will also be reported in order that Naval and other vessels may be warned to look out for dredges and other plant, temporary markers and lights.
(6) District Engineers having charge of improvements of harbors and waterways shown on charts of the Defense Mapping Agency or of the National Ocean Survey will send to both offices promptly, as ascertained for the correction of such charts, the following information: Descriptions of changes in channel location and depth, or of obstructions that may be discovered, with such prints and other information as may be necessary to permit the existing charts to be corrected to date. All maps should contain sufficient data to permit the fixed plane or reference, bench marks, base lines, etc., to be determined and located. The survey stations should be shown and, when no unreasonable expenditure of time or labor is involved, the map will show one or more triangulation station(s) of the National Ocean Survey in such a way as to facilitate connection of old or new work. The source of authority for the shoreline and topography should be stated on the map. The data supplied should indicate what charts are affected.
(7) When any survey of areas covered by charts of the Defense Mapping Agency or the National Ocean Survey is completed, a print of each tracing will be sent direct to both the Defense Mapping Agency and the National Ocean Survey. It is not necessary that tracings be fully complete as to form and title when such prints are made. An informal manuscript title marked “Advance Sheets”, and containing a description sufficient to identify the locality and to identify the source of the map, will be sufficient.
(8) Information relative to the improvement of harbors and waterways such as dredging operations, and precautions rendered necessary due to the presence of dredging or other plant will, when considered necessary, be brought to the attention of vessel owners or operators regularly using the waterway. This will be done through issuing bulletins or notices by District Engineers.
(h) Special Reports. Changes affecting navigation will be made promptly whenever information of immediate concern to navigation becomes known. Items of information especially desired are channel conditions as revealed by surveys, changes in channel conditions, either by natural causes or by dredging or other work, changes in approved projects for improvement with statements of results expected from proposed operations, descriptions of proposed dredging or other Federal work of improvement such as breakwater, pier, and revetment construction or alterations, descriptions of proposed or completed municipal or private improvements in or affecting navigable waters. Additional items of information desired are descriptions of wrecks, uncharted shoals, and other obstructions to navigation and particulars as to proposed or completed removal of same, changes in buoys or lights, erection of new, or changes in existing bridges, new or revised Federal or local rules and regulations for harbors and channels, and establishment or existence of danger areas in navigable waters. Reproductions of drawings or sketches which will be helpful in interpreting the data shall accompany the reports. The reports will not be limited to a reference to an accompanying drawing or sketch, but will contain a complete description in form suitable for publication in notices to mariners and the monthly supplements to the U.S. Coast Pilot. In this respect, the reports will provide enough information that a single notification to navigational interests will suffice. In the case of dredging or construction work, the bare statement that work will commence or has commenced on a certain date is insufficient. All additional information possible, such as probable duration of operations and object of work, will be given—the latter in the case of dredging being such data as the area to be covered and the depth expected to be provided. The reports required by this paragraph will be identified by reference to the appropriate Engineer Manual or regulation and will be numbered consecutively by each District during the calendar year, starting with number 1 at the beginning of each year.
(i) Information pamphlets, maps, brochures and other material. (1) Pub. L. 85-480, approved 2 July 1958, authorizes the Chief of Engineers to publish information pamphlets, maps, brochures, and other material on river and harbor, flood control, and other Civil Works activities, including related public park and recreation facilities under his jurisdiction, as he may deem to be of value to the general public.
(2) This Public Law authorizes the Chief of Engineers to provide for the sale of any of the material prepared under authority of the act—and of publications, charts, or other material prepared under his direction pursuant to other legislative authorization or appropriation, and to charge therefor a sum of not less than the cost of reproduction.
(3) District Engineers are authorized to publish the material covered in paragraph 8a above, and to sell such material. Except for material specifically prepared for free distribution to the general public, the charges for such other published information will be not less than the cost of its reproduction.
(4) Condition survey maps or charts, sold or otherwise distributed to the public, showing depths will specifically state the date or dates that the surveys were made. They shall also have the following notation printed or stamped thereon:
“The information depicted on this map represents the results of surveys made on the dates indicated and can only be considered as indicating the general conditions existing at that time.”
[43 FR 19661, May 8, 1978]
§ 209.335 Publication.
(a) Section 4 of the Administrative Procedure Act requires publication of general notice of proposed rule making in the Federal Register (unless all persons subject thereto are named and either personally served or otherwise have actual notice thereof in accordance with law), except to the extent that there is involved: (1) Any military, naval, or foreign affairs function of the United States or (2) any matter relating to agency management or personnel or to public property, loans, grants, benefits, or contracts. Except where notice of hearing is required by statute, this requirement does not apply to interpretative rules, general statements of policy, rules of agency organization, procedure, or practice, or in any situation in which the agency for good cause finds (and incorporates the finding and a brief statement of the reasons therefor in the rules issued) that notice and public procedure thereon are impracticable, unnecessary, or contrary to the public interest.
(b) General notice of proposed rule making published in accordance with the above will include: (1) A statement of the time, place, and nature of public rule making proceedings; (2) reference to the authority under which the rule is proposed; and (3) either the terms or substance of the proposed rule or a description of the subjects and issues involved.
§ 209.340 Laboratory investigations and materials testing.
(a) Purpose. The purpose of this section is to define and establish policies and procedures applicable to the performance of investigations and tests at Corps of Engineers laboratory installations for other governmental agencies and private organizations.
(b) Applicability. This regulation applies to Corps of Engineers Divisions and Districts operating soils, concrete, water quality and hydraulic laboratories, and to the Inter-Agency Sedimentation Project.
(c) References. (1) AR 37-20.
(2) AR 37-27.
(3) ER 1-1-6.
(4) ER 10-1-3, Appendix XIII.
(5) ER 1110-1-8100.
(6) ER 1140-2-303.
(d) Policy. Subject to the authority limitations contained in paragraph (f) of this section, laboratory investigations and materials testing may be performed for other agencies of the Federal Government, State and local units of government, foreign governments and private firms under the following conditions:
(1) The work will be performed on a cost reimbursable basis.
(2) Work may be performed for State and local units of government, foreign governments or private firms only when it is firmly established that private commercial laboratory facilities capable of performing such work are not available, or because of location or for other reasons it is clearly impractical to utilize such private commercial laboratory services. The requesting entity must further certify that such services cannot be procured reasonably and expeditiously through ordinary business channels.
(3) Performance of the work will not interfere with provisions of services essential to the mission of the Corps.
(4) Performance of the work will not require an increase in the permanent staff of the facility.
(5) Performance of the work will not require expansion of normal facilities.
(6) The work is within the scope of authorized activities of the laboratory at which the work is to be performed.
(7) Performance of the work will not be adverse to the public interest.
(8) Prior to undertaking laboratory investigations or materials testing for private firms, written certification will be obtained from such firms stating that the results of the work will not be used in litigation or for promotional purposes.
(e) Terms of providing reimbursement for work performed—(1) Federal agencies. Reimbursement for work for the Department of Defense, the Department of the Army, and other Federal Agencies will be in accordance with the procedures prescribed in AR 37-27.
(2) State and local units of Government. Funds to cover the total estimated cost of the work or an initial increment of the estimated cost based on an approved schedule of payment will be deposited with the installation performing the work before any obligations or expenses in connection with the work are incurred; and when funds are being deposited on an approved schedule no obligations or expenses will be incurred in connection with the work in excess of funds on deposit.
(3) Private concerns and foreign governments. Funds will be deposited in advance of the work as required in paragraph (e)(2) of this section. Charges shall include a surcharge of 15 percent of all applicable costs, except under the following conditions.
(i) When the final product will directly contribute to a specific planning, design, or construction activity which derives its principal support from Federal funds in the form of a grant or otherwise.
(ii) Where an exception is granted based on a direct benefit to the Government. Adequate justification, outlining the direct benefits which are expected to accrue to the Government, will be forwarded to HQDA (DAEN-CWE-DC) Washington, DC 20314, for review and approval prior to deletion of the surcharge.
(f) Authority. The following delegations of authority to perform laboratory investigations and materials testing apply.
(1) Division materials laboratories. Division Engineers are delegated the authority to approve laboratory work for Federal, State and local units of government when the total estimated cost of each investigation or test project is $15,000 or less. Division Engineers are also delegated the authority to approve laboratory work for private firms and foreign Governments when the total estimated cost of each investigation or test project is $5,000 or less. Approval is required when the estimated or actual costs exceed those delegations of authority. Requests for approval shall be addressed to DAEN-CWE-DC.
(2) Hydraulic laboratories. Division Engineers and District Engineers operating hydraulic laboratories or hydraulic model laboratories are delegated the authority to approve laboratory work for others within the same limitations and in accordance with the same procedures as apply to Division Materials Laboratories.
(3) Inter-Agency Sedimentation Project, St. Anthony Falls Laboratory, University of Minnesota, Minneapolis, Minnesota. The District Engineer, St. Paul is authorized to perform work required in procurement, testing and calibration of specialized sediment sampling equipment developed at the Inter-Agency Sedimentation Project. Equipment of this nature will be made available to Federal, State and local governmental agencies at cost. The District Engineer, St. Paul, is also authorized to approve the performance of testing and calibration work for U.S. private firms that fabricate this specialized equipment for commercial sale when the estimated cost for services of Corps personnel is $5,000 or less for a single order. Approval is required when the estimated single order cost for a private firm exceeds $5,000 and when the total cost of work during a fiscal year for any one private firm exceeds $15,000. Requests for approval shall be addressed to HQDA (DAEN-CWE-HY) Washington, DC 20314.
(g) Reports of testing results. Final reports of results will be submitted in accordance with instructions provided by the sponsoring organization, with two copies to HDQA (DAEN-CWE-DC) Washington, DC 20314.
Copies of reports of scientific or technical activities will be transmitted to the Defense Documentation Center as required by AR 70-31. (RCS OSD-1366)
(Sec. 3012, 70A Stat 157; 10 U.S.C. 3012)
[44 FR 50338, Aug. 28, 1979]
§ 209.345 Water resource policies and authorities.
Reimbursement for Advance Non-Federal Participation in Civil Works Projects
(a) Purpose. This regulation gives general instructions on use of section 215 of the Flood Control Act of 1968 (Pub. L. 90-483) to reimburse a non-Federal public body for construction of part of an authorized Federal project, part of an authorized Federal project. It establishes general policies, outlines procedures to be followed in reaching an agreement with an eligible non-Federal entity, and provides guidance on the provisions of such an agreement. All authorized projects are subject to this Act and regulation.
(b) Applicability. This regulation applies to all field operating agencies having Civil Works responsibilities.
(c) References. (1) Section 215, FCA of 1968 (Pub. L. 90-483, 42 U.S.C. 1962d-5a.). (APP A, this regulation).
(2) Senate Document No. 10, 90th Congress, 1st Session, “Study of Federal Reimbursement Policy for Work by States and other Non-Federal Entities on Authorized Water Resources Projects.”
(3) Section 221, FCA of 1970 (Pub. L. 91-611, 42 U.S.C. 1962d-5b).
(4) ER 405-2-680.
(5) ER 1140-2-301.
(6) ER 1180-1-1, (para. A-310, App. A).
(d) General policy. (1) The specific limitations put upon the allotment of funds authorized by section 215 indicate that only limited use should be made of the authority. It will, therefore, be Corps of Engineers policy to restrict the use of this authority to cases that meet all of the following conditions:
(i) The work, even if the Federal Government does not complete the authorized project, will be separately useful or will be an integral part of a larger non-Federal undertaking that is separately useful;
(ii) The work done by the non-Federal entity will not create a potential hazard;
(iii) Approval of the proposal will be in the general public interest;
(iv) Only work commenced after project authorization and execution of an agreement pursuant to this Regulation will be eligible for reimbursement or credit;
(v) Proposed reimbursement will not exceed the amount that the District Engineer considers a reasonable estimate of the reduction in Federal expenditures resulting from construction of the project component by the non-Federal entity.
(2) Before finally approving any agreement under section 215, the Chief of Engineers will inform the Secretary of the Army and the Chairman (Senate and House), Subcommittee on Public Works, Committee on Appropriations of the proposed arrangements. The Chief of Engineers will not sign an agreement until Secretarial and Committee concurrences are obtained.
(3) Section 215 authority will not be used where it might appear to circumvent the intent of Congress. It will not, for example, be used to initiate work on projects to which Congressional committees have indicated general opposition or refused to provide requested funds, or to accelerate portions of work on which construction has already been commenced by the Federal Government.
(4) Section 215(f) authorizes a specific allotment of funds to reimburse non-Federal entities for work accomplished under the Section. No allotment has been established, nor is one proposed at this time. Until one is, and firm procedures are established, any agreement with a non-Federal entity shall call for reimbursement, or for credit against required contributions, only when construction funds for the Federal project which incorporates the part constructed by the non-Federal entity are appropriated and allocated.
(5) The non-Federal entity will normally be required to develop the design memorandum, engineering plans, and specifications for the work it proposes to undertake. Subject to policies established in ER 1140-2-301, as modified in paragraph (e)(2) of this section, the District Engineer may provide engineering services with funds advanced by the non-Federal entity if he determines it to be impracticable for the entity to obtain the services elsewhere. Non-Federal engineering and overhead costs for the part of the Federal project that the non-Federal entity proposes to construct will be part of the reimbursement agreement.
(6) The agreement shall include local cooperation items required by the project authorization and by Section 221, FCA of 1970.
(7) Reimbursement of non-Federal work under Section 215 is not applicable to small projects authorized under the general authority of Section 107, Pub. L. 86-645, as amended. (33 U.S.C. 577); Section 205, Pub. L. 858, 80th Congress, as amended, (33 U.S.C. 701s); and Section 103, Pub. L. 87-874, as amended, (33 U.S.C. 426g); and Section 14, Pub. L. 79-526 (33 U.S.C. 701r).
(e) Procedures. (1) Non-Federal entities desiring reimbursement under Section 215 for constructing part of an authorized Federal project should confer with the District Engineer and submit a written proposal to him. This proposal will form the basis for consulting, as needed, with OCE and for deciding whether the proposal meets the policy criteria of paragraph (d) of this section, and whether to continue under the procedures below and what sequence to follow.
(2) If Federal preconstruction planning funds are not available to the project and it is considered impractical for the non-Federal entity to prepare a partial design memorandum and/or plans and specifications, the draft agreement may propose that this work be accomplished by the Corps of Engineers through an advance of non-Federal funds for this purpose. Certain advances of funds will be necessary, in any event, to cover other costs which are required on the part of the Corps of Engineers. Paragraph 11 of ER 1140-2-301 requires that requests to the Appropriations Committees for approval of advances of funds should normally be submitted to the Committees by non-Federal interests outside of Corps of Engineers channels. An exception to this procedure will be made in the case of Section 215 proposals in that the request for approval of advances will be made a part of the request to the committees for approval of the overall arrangement referred to in paragraph (d)(2) of this section. Thus, proposed advances of funds for the following purposes will be clearly set forth in the draft agreement: (i) Preparation of a partial design memorandum and/or plans and specifications (ii) corps review of design scheduled for accomplishment by local interests, and (iii) periodic and final inspections.
(3) The District Engineer will submit for review an unsigned draft agreement to OCE. All agreements will be prepared for the signature of the Chief of Engineers.
(4) The District Engineer will be notified of any changes in the draft agreement that the Chief of Engineers may require, and will negotiate a final agreement with the non-Federal entity. After signature of the agreement by the non-Federal entity, the District Engineer will forward three copies to HQDA (DAEN-CWO-C) WASH DC 20314, for signature by the Chief of Engineers.
(5) Upon receipt from OCE of the full executed agreement, the District Engineer will transmit the signed agreement to the non-Federal entity.
(6) The Division Engineer will review the (partial) design memorandum, and, if it meets the relevant criteria in paragraph (d)(1) of this section, will submit it to OCE with the recommendations on whether or not the work may proceed subject to reimbursement under the agreement.
(7) The Division Engineer will approve plans and specifications.
(8) The non-Federal entity will award contract.
(9) The District Engineer will conduct periodic and final inspections.
(10) Upon completion of the local work, the District Engineer will certify the cost data, and that performance has been in accordance with the agreement.
(f) Agreements. Agreements under Section 215 should follow the general format presented in paragraph (c)(6) of this section, adapted as warranted by the specific case. Each agreement shall:
(1) Expire 3 years after the date of execution if the non-Federal entity has not commenced the work contemplated by the agreement.
(2) State the time allowed for completion of the work. A reasonable time shall be allowed, but normally not over 2 construction seasons.
(3) Fully describe the work to be accomplished by the non-Federal entity and specify the manner in which it will be carried out.
(4) The agreement will specify that reimbursement by the Federal Government will not exceed $1,000,000.
(5) Provide for necessary review of designs, plans, and specifications, by the District Engineer.
(6) Provide for examination and review of proposed contracts and for inspection of the work by the District Engineer for conformance with the terms of the agreement.
(7) State fully the basis on which reimbursement or credit shall be determined, and provide for the final adjustment when the balance of the Federal project is constructed. If the improvement proposed by the non-Federal entity includes work that will not become a part of the Federal project, the means of determining the part eligible for reimbursement shall be fully defined.
(8) State that such reimbursement shall depend upon appropriation of funds applicable to the project and shall not take precedence over other pending projects of higher priority.
(9) Specify that reimbursement or credit for non-Federal work shall apply only to that work undertaken after execution of the agreement. The term “work” shall include advance engineering and design as well as actual construction.
(10) State that the agreement is not to be construed as committing the United States to reimbursement if the Federal project is not undertaken, or if the Federal project should be modified in such a way that the work performed by the non-Federal entity does not constitute a part thereof.
(11) Contain applicable equal employment clauses from Armed Services Procurement Regulations.
(g) Nature and amount of reimbursement. (1) The non-Federal entity may be reimbursed by a payment of cash, or, preferably, by reductions in any non-Federal contribution to the Federal project that may have been required by the legislation authorizing it, or by a combination of cash and such reductions.
(2) The amount of reimbursement shall equal the approved expenditures made by the non-Federal entity for work that would have been accomplished at Federal expense if the entire project were carried out by the Corps of Engineers, and as covered in the agreement under paragraphs (f) (7) and (10) of this section. The amount of reimbursement will not exceed, however, the amount that the District Engineer finds to be a reasonable estimate of the reduction in Federal expenditure resulting from construction by the non-Federal entity.
Appendix A to Part 209 Public Law 90-483, 90th Congress, S. 3710, August 13, 1968
An act authorizing the construction, repair, and preservation of certain public works on rivers and harbors for navigation, flood control, and for other purpose. (82 Stat. 731).
Sec. 215. (a) The Secretary of the Army, acting through the Chief of Engineers, may, when he determines it to be in the public interest, enter into agreement providing for reimbursement to States or political subdivisions thereof for work to be performed by such non-Federal public bodies at water resources development projects authorized for construction under the Secretary of the Army and the supervision of the Chief of Engineers. Such agreements may provide for reimbursement of installation costs incurred by such entities or an equivalent reduction in the contributions they would otherwise be required to make, or in appropriate cases, for a combination thereof. The amount of Federal reimbursement, including reductions in contributions, for a single project shall not exceed $1,000,000.
(b) Agreements entered into pursuant to this section shall (1) fully describe the work to be accomplished by the non-Federal public body, and be accompanied by an engineering plan if necessary therefor; (2) specify the manner in which such work shall be carried out; (3) provide for necessary review of design and plans, and inspection of the work by the Chief of Engineers or his designee; (4) state the basis on which the amount of reimbursement shall be determined; (5) state that such reimbursement shall be dependent upon the appropriation of funds applicable thereto or funds available therefor, and shall not take precedence over other pending projects of higher priority for improvements; and (6) specify that reimbursement or credit for non-Federal installation expenditures shall apply only to work undertaken or Federal projects after project authorization and execution of the agreement, and does not apply retroactively to past non-Federal work. Each such agreement shall expire three years after the date on which it is executed if the work to be undertaken by the non-Federal public body has not commenced before the expiration of that period. The time allowed for completion of the work will be determined by the Secretary of the Army, acting through the Chief of Engineers, and stated in the agreement.
(c) No reimbursement shall be made, and no expenditure shall be credited, pursuant to this section, unless and until the Chief of Engineers or his designee, has certified that the work for which reimbursement or credit is requested has been performed in accordance with the agreement.
(d) Reimbursement for work commenced by non-Federal public bodies no later than one year after enactment of this section, to carry out or assist in carrying out projects for beach erosion control, may be made in accordance with the provisions of section 2 of the Act of August 13, 1946, as amended (33 U.S.C. 426f). Reimbursement for such work may, as an alternative, be made in accordance with the provisions of this section, provided that agreement required herein shall have been executed prior to commencement of the work. Expenditures for projects for beach erosion control commenced by non-Federal public bodies subsequent to one year after enactment of this section may be reimbursed by the Secretary of the Army, acting through the Chief of Engineers, only in accordance with the provisions of this section.
(e) This section shall not be construed (1) as authorizing the United States to assume any responsibilities placed upon a non-Federal body by the conditions of project authorization, or (2) as committing the United State to reimburse non-Federal interests if the Federal project is not undertaken or is modified so as to make the work performed by the non-Federal Public body no longer applicable.
(f) The Secretary of the Army is authorized to allot from any appropriations hereafter made for civil works not to exceed $10,000,000 for any one fiscal year to carry out the provisions of this section. This limitation does not include specific project authorizations providing for reimbursement.
[42 FR 24050, May 12, 1977]
PART 221 WORK FOR OTHERS
Authority: Secs. 2 and 4(e) of the Federal Power Act of 1920 (41 Stat. 1603, 16 U.S.C. 791-823), as amended; sec. 10 of the River and Harbour Act of 1899 (30 Stat. 1151, 33 U.S.C. 403); and sec. 404 of Federal Water Pollution Control Act Amendments of 1972 (86 Stat. 816, 33 U.S.C. 1344)
Source: 43 FR 4979, Feb. 7, 1978, unless otherwise noted.
§ 221.1 Investigation and supervision of hydropower projects under the Federal Power Act (ER 1140-2-4).
(a) Purpose. This regulation 1 establishes procedures for executing Corps of Engineers functions under the authority of the Federal Power Act (FPA) administered by the Department of Energy, Federal Energy Regulatory Commission (FERC), formerly Federal Power Commission. Based on a specific request from FERC, these functions include:
1 This regulation supersedes ER 1140-2-4, 8 December 1967, and ER 1140-2-2, 10 September 1965.
(1) Investigation of applications filed with FERC for permits and licenses, and for relicensing of projects to ascertain impacts on Corps of Engineers responsibilities.
(2) Investigation of applications for surrender or termination of license to ascertain impacts on Corps of Engineers responsibilities.
(3) Supervision and inspection of operations of licensed hydroelectric projects to ascertain impacts on Corps of Engineers responsibilities.
(b) Applicability. This regulation applies to all field operating agencies having Civil Works responsibilities.
(c) References. (1) Federal Power Commission publication entitled “Federal Power Act”, as amended, dated 1 April 1975. The Act was originally enacted 10 June 1920 (41 Stat. 1063, 16 U.S.C. 791-823). This publication can be obtained from the U.S. Government Printing Office, Washington, D.C. 20402.
(2) Code of Federal Regulations, Title 18, part 1 to 149 relating to FERC General Rules and Regulations, available at the U.S. Government Printing Office, Washington, D.C. 20402.
(3) ER 1145-2-303 (33 CFR 209.120), 2 Permits for Activities in Navigable Waters or Ocean Waters.
2 33 CFR 209.120 was removed at 42 FR 37133, July 19, 1977.
(4) ER 1140-2-1, Submission of Data for Headwater Benefits Determination.
(d) Definitions—(1) Licensed project. A non-Federal hydroelectric project for which the FERC has issued a license granting authority for either construction, in the case of a proposed project, or for continued operation and maintenance of an existing project.
(2) Major projects. Hydroelectric projects with more than 2,000 horsepower installed capacity.
(3) Minor projects. Hydroelectric projects having installed capacity of 2,000 horsepower or less.
(4) Preliminary permit application. An application filed by a non-Federal entity with the FERC as a preliminary step in anticipation of filing for a license to construct and operate a hydroelectric project. A preliminary permit does not authorize construction. It merely gives the permittee priority of application for a FERC license over other non-Federal entities for a period of time. The permittee then develops information necessary for inclusion in an application for license to construct and operate a hydroelectric project. Analysis of this information may result in a decision to apply for the license or to withdraw the intent.
(5) Relicensing. A procedure applicable to projects for which the original period of license (usually 50 years) will expire or has expired and application for new license has been or will be filed with the FERC.
(6) Take over. An act whereby the Federal government assumes project ownership. Upon expiration of a license for a hydroelectric project, the United States, under certain specific conditions set forth in section 14 of the Federal Power Act may “take over”, maintain and operate the project. This does not apply to any project owned by a State or local government. Take over procedures are not applicable to “Minor Projects.”
(e) Authorities. The Federal Power Act as amended delegates to the Secretary of the Army, the Chief of Engineers and the Corps of Engineers certain functions necessary for the FERC's administration of the Act. Implementation was provided through instructions issued by the President in a letter dated 18 May 1931 to the Secretary of War. These functions are set forth in the following excerpts from the Act:
(1) Section 2 of the Act provides in part that:
The Commission may request the President to detail an officer or officers from the Corps of Engineers, or other branches of the United States Army to serve the Commission as engineer officer or officers * * *.
(2) Section 4(e) of the Act provides in part that:
The Commission is hereby authorized and empowered * * * to issue licenses to citizens of the United States, or to any associations of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of construction, operating, and maintaining dams, water conduits, reservoirs, powerhouses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization, of power across, along, from or in any of the streams or other bodies of water over which Congress has jurisdiction * * *.
* * *Provided that no license affecting the navigable capacity of any navigable water of the United States shall be issued until the plans of the dam or other structures affecting navigation have been approved by the Chief of Engineers and the Secretary of the Army.
(f) Investigation of application for permits, licenses, or relicensing of projects. Upon referral by the FERC, the Chief of Engineers will assign the investigation of an application for permit, license or relicensing to the appropriate Division Engineer who will submit a report on the investigation as specified herein to HQDA (DAEN-CWE-HY) WASH DC 20314 (exempt from reports control, Paragraph 7-2y, AR 335-15). The investigation should be coordinated with all interested organization elements including Engineering, Construction/Operations, Planning and Office of the Counsel. The date that the report is to be submitted will be specified. The nature of investigation and report by the Division Engineer will depend upon the nature of the request from the FERC. In general, reports as appropriate for the type of application filed with the Commission will consider the following items as pertinent and will include recommendation of pertinent license provisions:
(1) License applications. (i) The effect of the project on navigation and flood control, including adequacies of the plans of the structures affecting navigation. Section 4(e) of the Federal Power Act provides for approval of plans for hydroelectric power projects as noted in paragraph (e)(2) of this section. Section 4(e) approval normally will obviate the need for a Department of Army permit under section 10 of the 1899 River and Harbor Act. The basis for Corps approval under section 4(e) will be limited to effects on navigation; however, section 4(e) does not obviate the need for a Department of the Army permit pursuant to section 404 of the Federal Water Pollution Control Act (see paragraph (i)(2)) of this section. Such a permit is subject to a full public interest review pursuant to 33 CFR part 320 and the application of the Environmental Protection Agency's guidelines in 40 CFR part 230.
(ii) Recommendations for license provisions required to protect the interest of navigation. This item is discussed under paragraphs 7, 8 and 9.
(iii) Consideration of the project in relation to a comprehensive plan for developing the basin water resources from the standpoint of the Corps of Engineers' programs and responsibilities. Specific references should be made to pertinent published Congressional documents containing results of studies and/or to Congressional resolutions directing studies to be made to provide identification.
(iv) Consideration of environmental aspects of a project as related to navigation and flood control matters or other specific Corps interests and responsibilities in particular cases.
(v) The matter of possible redevelopment of an existing project to improve the usefulness of the project in relation to the objectives of the Corps program in the basin. In the case of an unconstructed project, based on request from the Commission, a recommendation along with justification, should be included as to whether or not development should be undertaken by the United States.
(vi) Consideration of structural safety and adequacy of spillway design flood for FERC licensed projects are the responsibility of the FERC. The Dam Safety Act, Pub. L. 92-367 provides that dams constructed pursuant to license issued under the authority of Federal Power Act are specifically exempted from the Corps National inspection program. This does not preclude the Corps District and Division offices from making comments on license applications for the FERC information, about any design deficiencies that are brought to their attention.
(2) Relicensing (new license) application. (i) Consider paragraphs (f) (1) through (6) of this section.
(ii) Recommendations should be furnished to the FERC with respect to possible need for “take over” of a project by the Federal Government. Details on “take over” under the Federal Power Act are provided in part 16 of the CFR, title 18 (part 1 to 149). A copy of part 16 is provided for ready reference in appendix A of this part.
(iii) FERC Preliminary Permit Application. Consider appropriate recommendations to insure coordination of applicant's studies with the Division or District Engineer in cases where responsibilities and interests of the Corps of Engineers would be affected. The report should include discussion of Corps interests which could result in recommendations for provisions to be included in a subsequent license. In general proposed construction of power facilities at or in conjunction with a Corps reservoir project will be reviewed with the objective of recommending design, construction and operation factors that the applicant must consider in its studies in order for the proposed power development to be compatible, physically and economically, with the authorized function of the Corps project(s).
(g) Terms and conditions for insertion in FERC permits and licenses. In investigation of an application for FERC license or permit, consideration will be given to aspects of the project affecting authorized functions of the Corps as well as to the responsibilities assigned to the Corps by the Federal Power Act. Accordingly, the Division engineer in his report on an application to the Chief of Engineers will always consider the necessity for including in any license or permit terms and conditions to protect the interests of navigation. Recommendations involving other responsibilities of the Corps in the area of water control management such as flood control, low flow augmentation minimum instantaneous releases, and other purposes should also be considered.
(h) Standard terms and conditions used by the FERC in its permits and licenses. Appendix B to this Regulation includes standard terms and conditions used by the FERC in licenses for projects affecting navigable waters of the U.S. The standard articles, included in appendix B, are identified by the FERC in the following Forms:
(1) Form L-3 (Revised October 1975)
Terms and Conditions of License for Constructed Major Project Affecting Navigable Waters of the United States.
(2) Form L-4 (Revised October 1975)
Terms and Conditions of License for Unconstructed Major Project Affecting Navigable Waters of the United States.
Any special terms and conditions pertaining to the Corps of Engineers responsibilities, in addition to those identified in appendix B should be tailored to suit the situation involved. Appendix B also provides a list of other FERC standard articles Forms that could be obtained from FERC offices.
(i) Distinction between Corps of Engineers and FERC jurisdiction with respect to non-Federal Hydroelectric projects. (1) The following procedures are currently being followed in connection with Department of Army permit responsibilities involving pre-1920 legislation:
(i) In regard to FERC licensing of projects, Corps responsibilities under section 10 of the River and Harbor Act of 1899, for power related activities, may normally be met through the FERC licensing procedure including insertion of terms and conditions in the license of the interest of navigation. Section 4(e) of the Federal Power Act provides for approval of plans of project works by the Chief of Engineers and Secretary of the Army from the standpoint of interests of navigation. The consideration for our approval under section 4(e) will be limited to effects of project power related activities on navigation.
(ii) Applications to Corps Division or District Engineers for approval of repairs, maintenance or modification of non-Federal water power projects authorized under River and Harbor Acts as well as special Acts of Congress prior to 1920, or requests for advice with respect thereto should be referred to the FERC for consideration in accordance with the provisions of the Federal Power Act. The permittee should be advised that the application is being referred to the FERC for consideration and that if a FERC license is required Corps recommendations will be furnished to the FERC.
(2) Responsibilities under section 404 of the Federal Water Pollution Control Act as amended in 1972 (33 U.S.C. 1151) pertinent to discharge of dredged or fill material into the navigable waters at specified disposal sites will be met only through the Department of Army permit procedures as specified in ER 1145-2-303. In regard to FERC cases involving section 404, our report to the FERC through (DAEN-CWE-HY) will specify the need for a Department of Army permit (section 404) if, on the basis of the Division and District Engineers' reports, such permit is deemed necessary. A Department of the Army permit will be required for any portion of a proposed project which involves the discharge of dredged or fill material into the waters of the United States. This includes the placement of fill necessary for construction of a project's dam and appurtenant structures.
(3) When applicable, FERC will be advised that the requirement for Department of the Army permit pursuant to section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 for the transport of dredged material from the project site for the purpose of dumping it into the ocean waters will be met only through the Department of the Army permit program.
(4) In connection with FERC licensed projects there may be proposed non-power water oriented activities, such as recreational development, which are associated with the overall project but may not be a part of the hydroelectric power facilities at the project. Such cases, if involving navigable waters should be reviewed from the standpoint of need for a section 10 permit. Such section 10 permit actions would involve consideration of the overall public interest, including water quality, fish and wildlife, recreation, general environmental concerns and the needs and welfare of the people. Corps responsibilities for permit requirements under section 10 of the River and Harbor Act of 1899 for nonpower activities affecting navigable waters at the FERC projects will be met only through the Corps permit procedures. The Corps' report to FERC through (DAEN-CWE-HY) will specify the need for such permit when recommended by the Division and District Engineers' report.
(j) Investigation of applications for surrender or termination of license. The period of the FERC license for hydroelectric projects is usually 50 years. During and/or upon the expiration of the period of a license, a licensee may file with the FERC an application for surrender or termination of its license. These applications may encompass requests for physical removal of an existing dam and/or powerhouse structures from a stream. Division Engineers who would be assigned by the Chief of Engineers to review such applications will consider, in their review and report to DAEN-CWE-HY, the possibility that sediment discharge resulting from removal of a dam structure from a navigable river or from any site that may affect navigable waters would impair the anchorage and navigation and/or flood carrying capacity of the stream. In cases where there is a possibility of significant downstream shoaling (sedimentation) as the result of removal of a dam and its appurtenant structures, recommendation may be made to the FERC, through DAEN-CWE-HY, requiring licensee as a condition of approval of dam removal to agree to bear the expense for removal of any shoaling at the navigable river(s) which would be determined by the Corps to be detrimental to navigation. Other recommendations to be considered include gradual lowering of a dam over a period of time and/or possibility of sediment removal prior to dam removal. It should also be noted that a Department of the Army permit under section 404 of the Federal Water Pollution Control Act amendments of 1972 (33 U.S.C. 1151), as discussed in Paragraph 9b of this regulation, may be needed in connection with removal of dams on or affecting the navigable waters if a discharge of dredged or fill material also occurs during the removal operation. Other recommendations within the Corps authority that should be considered in reviewing applications for surrender or termination of licenses for projects where their power facilities have been removed, or recommended for removal, is that upon any approval of such application by the FERC, continuation of existence of the nonpower project on or affecting the navigable waters of the U.S. will require a Department of the Army permit in compliance with section 10 of the River and Harbor Act of 1899. Furthermore, it should be noted that in the absence of FERC nonpower use license, pursuant to 16 U.S.C. 808(b), the structural safety and maintenance of dam and reservoir for a nonpower project will be governed by the laws and regulations of the State in which the project is located.
(k) Supervision and inspection of operation of licensed hydroelectric projects. Corps Division and District Engineers responsibilities with respect to any project affecting navigable waters include surveillance of operation and maintenance to insure that the interests of navigation are not adversely affected. In addition, in certain cases the Corps, at the request of the FERC, may act as agent for the FERC for overall supervision of project operation and maintenance. Corps Division Engineers have, in the past, represented the FERC in supervision and inspection of a number of FERC licensed projects within their respective divisions. The Commission by letter dated March 4, 1976 relieved the Corps of Engineers from acting as the Commission's representative for supervision and inspection of its licensed projects. This responsibility has been transferred by the Commission to its own regional engineers. There are no requirements for any periodic or annual reports from the Division offices regarding the operation of FERC licensed hydroelectric projects. However, Division Engineers will report to DAEN-CWE-HY on a current basis any significant detrimental effects with respect to Corps of Engineers responsibilities or other matters which come to their attention.
(l) Safety of licensed hydroelectric projects. The Dam Safety Act, Public Law 92-367, provides that dams constructed pursuant to licenses issued under the authority of the Federal Power Act are specifically exempted from the national inspection program administered by the Corps. However, the law further provides that the Secretary of the Army upon request of the FERC may inspect dams which have been licensed under the Federal Power Act. The Commission by letter dated August 29, 1972 informed the Corps that the Commission does not expect to request the Corps' assistance for inspecting the projects licensed under the Federal Power Act.
(m) Supervision of construction of licensed hydroelectric projects. In cases where the FERC may request the Corps to supervise the actual construction of licensed hydroelectric project on behalf of the Commission, instructions will be furnished to the appropriate District Engineer through the Division Engineer at the time the request is made.
(n) Other investigation under the Federal Power Act. Corps of Engineers operations under the Federal Power Act also include participation in FERC procedures in determining headwater benefits from Corps reservoir projects (RCS, 1461-FPC). This matter is discussed in ER 1140-2-1.
(o) Funding of operations under the Federal Power Act. (1) The salaries of the Corps of Engineers personnel involved in investigations discussed herein will be charged against funds for “Special Investigations” under the appropriation for “General Expenses.” The FERC may provide reimbursement if requested by the Chief of Engineers to cover the nonpersonal expenses which may be incurred in the investigation and supervision of projects under permits and licenses.
(2) Non-personal costs amounting to less than $100 for any single investigation will not be reimbursed from the Commission funds but will be charged also to “Special Investigations” under the appropriations for “General Expenses.” Each Division Engineer charged with a detailed investigation of an application for license or the supervision of a project that will require more than a nominal amount of nonpersonal costs will be specifically requested to submit an estimate of the funds required upon assignment of the work by the Chief of Engineers.
(3) Reimbursement from the FERC funds for nonpersonal costs in excess of $100 will be made by the Chief of Engineers upon submission of a voucher on Standard Form 1080 by the District Engineer through the Division Engineer. The voucher will show the fiscal year during which the work was done and the Commission project number on which the money was spent.
Appendix A to Part 221 Part 16-Procedures Relating to Takeover and Relicensing of Licensed Projects
Sec.
16.1 Purpose and coverage.
16.2 Public notice of projects under expiring license.
16.3 When to file.
16.4 Notice upon filing of application.
16.5 Annual licenses.
16.6 Applications for new license for projects subject to sections 14 and 15 of the Federal Power Act and all other major projects.
16.7 Application for nonpower license.
16.8 Departmental recommendations for takeover.
16.9 Commission recommendation to Congress.
16.10 Motion for stay by Federal department or agency.
16.11 Procedures upon congressional authorization of takeover.
16.12 Renewal of minor or minor part licenses not subject to sections 14 and 15.
16.13 Acceptance for filing or rejection of application.
Authority:Federal Power Act, secs. 7(c), 14, 15, 309 (16 U.S.C. 800, 807, 808, 825h.
Source:Order 141, 12 FR 8461, Dec. 19, 1947, as amended by Order 175, 19 FR 5212, Aug. 18, 1954; Order 260, 28 FR 814, Jan. 11, 1963; 28 FR 1680, Feb. 21, 1963; 28 FR 2270, Mar. 8, 1963; Order 288, 29 FR 14106, Oct. 14, 1964; Order 384, 34 FR 12269, July 25, 1969, unless otherwise noted.
§ 16.1 Purpose and coverage.
This part implements the amendments of sections 7(c), 14, and 15 of part I of the Federal Power Act, as amended, enacted by Public Law 90-451, 82 Stat. 616, approved August 3, 1968. It applies to projects subject to sections 14 and 15 of the Federal Power Act including projects for which a nonpower license may be issued. Procedures are provided for the filing of applications for either power or nonpower licenses for projects whose licenses are expiring. A license for a power project issued to either the original licensee or another licensee is referred to in this part as a “new license” and a license for a nonpower project as a “non-power license”. Also provided are procedures for the filing of recommendations for takeover by Federal departments or agencies and applications for renewal of licenses not subject to section 14.
§ 16.2 Public notice of projects under expiring license.
In order that there should be adequate notice and opportunity to file timely applications for a license the Commission's Secretary will give notice of the expiration of license of a project (except transmission line and minor projects) 5 years in advance thereof in the same manner as provided in section 4(f) of the Act. The Secretary shall upon promulgation of the rules herein give notice, as provided in section 4(f) of the Act, of all whose license terms have expired since January 1, 1968, or which will expire within 5 years of the effective date of this rule. In addition, the Commission each year will publish in its annual report and in the Federal Register a table showing the projects which will expire during the succeeding 5 years. The table will list these licenses according to their expiration dates and will contain the following information: (a) License expiration date; (b) licensee's name; (c) project number; (d) type of principal project works licensed, e.g., dam and reservoir, powerhouse, transmission lines; (e) location by State, county, and stream; also by city or nearby city when appropriate; and (f) plant installed capacity.
§ 16.3 When to file.
(a) An existing licensee must file an application for a “new license” or “nonpower license” or a statement of intention not to file an application for a “new license” no earlier than 5 years and no later than 3 years prior to the expiration of its license, except that, where the license will expire within 3 1/2 years of the issuance of this part, such applications or statements shall be filed within 6 months from the effective date of this part. Applicants which have applications pending which were filed under previous Commission regulations shall supplement their applications in accordance with pertinent provisions of this part within 6 months of the effective date of this part.
(b) Any other person or municipality may file an application for a “new license” or “non-power license” within 5 years of the expiration of the license, but in no event, unless authorized by the Commission, later than 6 months after issuance of notice of the filing of an application or statement by the licensee under § 16.4 or 2 1/2 years before the expiration of the license, whichever is earlier.
(c) Any application submitted after the expiration of the time specified herein for filing must be accompanied by a motion requesting permission to file late, which motion shall detail the reasons of good cause why the application was not timely filed and how the public interest would be served by its consideration.
§ 16.4 Notice upon filing of application.
When any timely application or statement within the meaning of § 16.3 is received, or when the Commission grants any motion for consideration of a late filed application, notice of receipt thereof will be furnished the applicant, and public notice will be given in the same manner as provided in sections 4(f) and 15(b) of the Act (49 Stat. 838; 41 Stat. 1072; 82 Stat. 616; 16 U.S.C. 797, 808) §§ 1.37 and 2.1 of this chapter, the Fish and Wildlife Coordination Act, 48 Stat. 401, as amended, 16 U.S.C. 661 et seq., and by publication in the Federal Register.
§ 16.5 Annual licenses.
No application for annual license need be filed nor will such application be accepted under section 15 of the Act. An existing licensee making timely filing for a new license will be deemed to have filed for an annual license. If the Commission has not acted upon an application by licensee for a new license at the expiration of the license terms, by the issuance of an order granting, denying or dismissing it, an annual license shall be issued by notice of the Secretary.
§ 16.6 Applications for new license for projects subject to sections 14 and 15 of the Federal Power Act and all other major projects.
(a) Each application for a new license hereunder shall conform in form to § 131.2 of this chapter, and shall set forth in appropriate detail all information and exhibits prescribed in §§ 4.40 through 4.42 of this chapter, inclusive and in § 4.51 of this chapter, as well as additional information specified in paragraphs (b) through (e) of this section, except that Exhibit A may be incorporated in an application by reference where one applicant files applications for several projects, one of which already contains an Exhibit A or in any case where applicant has filed an Exhibit A within 10 years preceding the filing of the application, and that Exhibits N and O as specified in § 4.41 of this chapter need only be filed as provided in paragraph (c) of this section. An original and fourteen conformed copies of the application and all accompanying exhibits shall be submitted to the Commission plus one additional conformed copy for each interested State Commission.
(b) An application for a “new license” hereunder shall include a statement showing the amount which licensee estimates would be payable if the project were to be taken over at the end of the license term pursuant to the provisions of sections 14 and 15 of the Federal Power Act. This statement shall include estimates of: (1) Fair value; (2) net investment; and (3) severance damages. (This subsection is not applicable to State, municipal, or nonlicensee applicants.)
(c) If the applicant proposes project works in addition to those already under license, the maps, plans, and descriptions of the project works (Exs. I, J, L and M) shall distinguish the project works of parts thereof which have been constructed from those to be constructed. Exhibits N and O shall also be included in the application relating to new construction.
(d) Applicant shall furnish its plans for the future modification or redevelopment of the project, if any, and shall set forth in detail why technically feasible, additional capacity is not proposed for installation at the time of relicensing.
(e) Applicant shall file a statement on the effect that takeover by the United States or relicensing to another applicant would have upon the supply of electric energy to the system with which it is interconnected, the rates charged its customers, the licensee's financial condition, and taxes collected by local, State, and Federal Governments. (This subsection is not applicable to State, municipal or nonlicensee applicants.)
§ 16.7 Application for nonpower license.
Each application for “non-power license” shall generally follow the form prescribed in § 131.6 of this chapter, except for subsections 7 and 8 thereof. It shall be accompanied by Exhibits K, L, R, and S prepared as described in section 4.41, and shall include the information specified in paragraphs (a) through (c) of this section. Unless otherwise specified, an original and 14 conformed copies of the application and all accompanying exhibits shall be submitted with one additional conformed copy for each interested State commission. Additional information may be requested by the Commission if desired.
(a) Applicant shall furnish a description of the nonpower purpose for which the project is to be utilized and a showing of how such use conforms with a comprehensive plan for improving or developing a waterway or waterways for beneficial uses, including a statement of the probable impact which conversion of the project to nonpower use will have on the power supply of the system served by the project.
(b) Applicant shall identify the State, municipal, interstate or Federal agency, if any, which is authorized or willing to assume regulatory supervision over the land, waterways and facilities to be included within the nonpower project. (If there is such an agency, applicant shall forward one copy of the application to such agency.)
(c) Applicant shall submit a proposal for the removal or other disposition of power facilities of the project.
A “non-power license” shall be effective until such time as in the judgement of the Commission a State, municipal, interstate, or Federal agency is authorized and willing to assume regulatory supervision over the land, waterways, and facilities included within the “non-power license” or until the project structures are removed. Such State, municipal, interstate or Federal agency may petition the Commission for termination of a “non-power license” at any time. Where the existing project is located on the public lands or reservations of the United States, and there is no application for relicensing as a power project either by the original licensee, or some other entity, or a takeover recommendation, the Commission may, in its discretion, and upon a showing by the agency having jurisdiction over the lands or reservations that it is prepared to assume requisite regulatory supervision for the nonpower use of the project, terminate the proceeding without issuing any license for nonpower use.
§ 16.8 Departmental recommendations for takeover.
A recommendation that the United States exercise its right to take over a project may be filed by any Federal department or agency no earlier than 5 years and no later than 2 years prior to the expiration of the license term; Provided, however, That such recommendation shall not be filed later than 9 months after the issuance of a notice of application for a new license. Departments or agencies filing such recommendations shall thereby become parties to the relicensing-takeover proceeding. An original and 14 copies of the recommendation shall be filed together with one additional copy for each interested State commission. The recommendation shall specify the project works which would be taken over by the United States, shall include a detailed description of the proposed Federal operation of the project, including any plans for its redevelopment and shall indicate how takeover would serve the public interest as fully as non-Federal development and operation. It shall also include a statement indicating whether the agency making the recommendation intends to undertake operation of the project. A copy of the recommendation shall be served upon the licensee by the Commission's Secretary. Any applicant for a new license covering all or part of the project involved in the takeover recommendation shall have 120 days within which to serve a reply to the recommendation upon the Commission with copies to any parties in the proceeding.
§ 16.9 Commission recommendation to Congress.
If the Commission, after notice and opportunity for hearing, concludes upon departmental recommendation, a proposal of any party, or its own motion, that the standards of section 10(a) of the Act would best be served if a project whose license is expiring is taken over by the United States, it will issue its findings and recommendations to this effect, and after any modification thereof, upon consideration of any application for reconsideration, made in conformity with the provisions of § 1.34 of this chapter governing applications for rehearing, forward copies of its findings and recommendations to the Congress.
§ 16.10 Motion for stay by Federal department or agency.
If the Commission does not recommend to the Congress that a project be taken over, a Federal department or agency which has filed a timely recommendation for takeover as provided in this part may, within thirty (30) days of issuance of an order granting a license, file a motion, with copies to the parties in the proceeding, before the Commission requesting a stay of the license order. Upon the filing of such a motion, the license order automatically will be stayed for 2 years from the date of issuance of the order, unless the stay is terminated earlier upon motion of the department or agency requesting the stay or by action of Congress. The Commission will notify Congress of any such stay. Upon expiration or termination of the stay, including any extension thereof by act of Congress, the Commission's license order shall automatically become effective in accordance with its terms. The Commission will notify Congress of each license order which has become effective by reason of the expiration or termination of a stay.
§ 16.11 Procedures upon congressional authorization of takeover.
A determination whether or not there is to be a Federal takeover of a project would ultimately be made by Congress through the enactment of appropriate legislation. If Congress authorizes takeover, the Secretary will immediately give the Licensee not less than 2 years' notice in writing of such action. Within 6 months of issuance of such notice the Licensee shall present to the Commission any claim for compensation consistent with the provisions of section 14 of the Federal Power Act and the regulations of the Commission.
§ 16.12 Renewal of minor or minor part licenses not subject to sections 14 and 15.
Licenses whose minor or minor part licenses are not subject to sections 14 and 15 of the Act and wish to continue operation of the project after the end of the license term shall file an application for a “new license” 1 year prior to the expiration of their original license in accordance with applicable provisions of part 4 of this chapter.
§ 16.13 Acceptance for filing or rejection of application.
Acceptance for filing or rejection of applications under this part shall be in accordance with the provisions of § 4.31 of this chapter.
Appendix B to Part 221 Federal Energy Regulatory Commission Form L-3 (Revised October 1975)
terms and conditions of license for constructed major project affecting navigable waters of the united states
Article 1. The entire project, as described in this order of the Commission, shall be subject to all of the provisions, terms, and conditions of the license.
Article 2. No substantial change shall be made in the maps, plans, specifications, and statements described and designated as exhibits and approved by the Commission in its order as a part of the license until such change shall have been approved by the Commission: Provided, however, That if the Licensee or the Commission deems it necessary or desirable that said approved exhibits, or any of them, be changed, there shall be submitted to the Commission for approval a revised, or additional exhibit or exhibits covering the proposed changes which, upon approval by the Commission, shall become a part of the license and shall supersede, in whole or in part, such exhibit or exhibits theretofore made a part of the license as may be specified by the Commission.
Article 3. The project area and project works shall be in substantial conformity with the approved exhibits referred to in Article 2 herein or as changed in accordance with the provisions of said article. Except when emergency shall require for the protection of navigation, life, health, or property, there shall not be made without prior approval of the Commission any substantial alteration or addition not in conformity with the approved plans to any dam or other project works under the license or any substantial use of project lands and waters not authorized herein; and any emergency alteration, addition, or use so made shall thereafter be subject to such modification and change as the Commission may direct. Minor changes in project works, or in uses of project lands and waters, or divergence from such approved exhibits may be made if such changes will not result in a decrease in efficiency, in a material increase in cost, in an adverse environmental impact, or in impairment of the general scheme of development; but any of such minor changes made without the prior approval of the Commission, which in its judgement have produced or will produce any of such results shall be subject to such alteration as the Commission may direct.
Article 4. The project, including its operation and maintenance and any work incidental to additions or alterations authorized by the Commission, whether or not conducted upon lands of the United States, shall be subject to the inspection and supervision of the Regional Engineer, Federal Power Commission, in the region wherein the project is located, or of such other officer or agent as the Commission may designate, who shall be the authorized representative of the Commission for such purposes. The Licensee shall cooperate fully with said representative and shall furnish him such information as he may require concerning the operation and maintenance of the project, and any such alterations thereto, and shall notify him of the date upon which work with respect to any alteration will begin, as far in advance thereof as said representative may reasonably specify, and shall notify him promptly in writing of any suspension of work for a period of more than one week, and of its resumption and completion. The Licensee shall submit to said representative a detailed program of inspection by the Licensee that will provide for an adequate and qualified inspection force for construction of any such alterations to the project. Construction of said alterations or any feature thereof shall not be initiated until the program of inspection for the alterations or any feature thereof has been approved by said representative. The Licensee shall allow said representative and other officers or employees of the United States, showing proper credentials, free and unrestricted access to, through, and across the project lands and projects works in the performance of their official duties. The Licensee shall comply with such rules and regulations of general or special applicability as the Commission may prescribe from time to time for the protection of life, health, or property.
Article 5. The Licensee, within five years from the date of issuance of the license, shall acquire title in fee or the right to use in perpetuity all lands, other than lands of the United States, necessary or appropriate for the construction, maintenance, and operation of the project. The Licensee or its successors and assigns shall, during the period of the license, retain the possession of all project property covered by the license as issued or as later amended, including the project area, the project works, and all franchises, easements, water rights, and rights of occupancy and use; and none of such properties shall be voluntarily sold, leased, transferred, abandoned, or otherwise disposed of without the prior written approval of the Commission, except that the Licensee may lease or otherwise dispose of interests in projects lands or property without specific written approval of the Commission pursuant to the then current regulations of the Commission. The provisions of this article are not intended to prevent the abandonment or the retirement from service of structures, equipment, or other project works in connection with replacements thereof when they become obsolete, inadequate, or inefficient for further service due to wear and tear; and mortgage or trust deeds or judicial sales made thereunder, or tax sales, shall not be deemed voluntary transfers within the meaning of this article.
Article 6. In the event the project is taken over by the United States upon the termination of the license as provided in Section 14 of the Federal Power Act, or is transferred to a new licensee or to a non-power licensee under the provisions of Section 15 of said Act the Licensee, its successors and assigns shall be responsible for, and shall make good any defect of title to, or of right of occupancy and use in, any of such project property that is necessary or appropriate or valuable and serviceable in the maintenance and operation of the project, and shall pay and discharge, or shall assume responsibility for payment and discharge of, all liens or encumbrances upon the projects or project property created by the Licensee or created or incurred after the issuance of the license: Provided, That the provisions of this article are not intended to require the Licensee, for the purpose of transferring the project to the United States or to a new licensee, to acquire any different title to, or right of occupancy and use in, any of such project property than was necessary to acquire for its own purposes as the Licensee.
Article 7. The actual legitimate original cost of the project, and of any addition thereto or betterment thereof, shall be determined by the Commission in accordance with the Federal Power Act and the Commission's Rules and Regulations thereunder.
Article 8. The licensee shall install and thereafter maintain gages and stream-gaging stations for the purpose of determining the stage and flow of the stream or streams on which the project is located, the amount of water held in and withdrawn from storage, and the effective head on the turbines; shall provide for the required reading of such gages and for the adequate rating of such stations; and shall install and maintain standard meters adequate for the determination of the amount of electric energy generated by the project works. The number, character, and location of gages, meters, or other measuring devices, and the method of operation thereof, shall at all times be satisfactory to the Commission or its authorized representative. The Commission reserves the right, after notice and opportunity for hearing, to require such alterations in the number, character, and location of gages, meters, or other measuring devices, and the method of operation thereof, as are necessary to secure adequate determinations. The installation of gages, the rating of said stream or streams, and the determination of the flow thereof, shall be under the supervision of, or in cooperation with, the District Engineer of the United States Geological Survey having charge of stream-gaging operations in the region of the project, and the Licensee shall advance to the United States Geological Survey the amount of funds estimated to be necessary for such supervision, or cooperation for such periods as may be mutually agreed upon. The Licensee shall keep accurate and sufficient records of the foregoing determinations to the satisfaction of the Commission, and shall make return of such records annually at such time and in such form as the Commission may prescribe.
Article 9. The Licensee shall, after notice and opportunity for hearing, install additional capacity or make other changes in the project as directed by the Commission, to the extent that it is economically sound and in the public interest to do so.
Article 10. The Licensee shall, after notice and opportunity for hearing, coordinate the operation of the project, electrically and hydraulically, with such other projects or power systems and in such manner as the Commission may direct in the interest of power and other beneficial public uses of water resources, and on such conditions concerning the equitable sharing of benefits by the Licensee as the Commission may order.
Article 11. Whenever the Licensee is directly benefited by the construction work of another licensee, a permittee, or the United States on a storage reservoir or other headwater improvement, the Licensee shall reimburse the owner of the headwater improvement for such part of the annual charges for interest, maintenance, and depreciation thereof as the Commission shall determine to be equitable, and shall pay to the United States the cost of making such determination as fixed by the Commission. For benefits provided by a storage reservoir or other headwater improvement of the United States, the Licensee shall pay to the Commission the amounts for which it is billed from time to time for such headwater benefits and for the cost of making the determinations pursuant to the then current regulations of the Commission under the Federal Power Act.
Article 12. The United States specifically retains and safeguards the right to use water in such amount, to be determined by the Secretary of the Army, as may be necessary for the purposes of navigation on the navigable waterway affected; and the operations of the Licensee, so far as they affect the use, storage and discharge from storage of waters affected by the license, shall at all time be controlled by such reasonable rules and regulations as the Secretary of the Army may prescribe in the interest of navigation, and as the Commission may prescribe for the protection of life, health, and property, and in the interest of the fullest practicable conservation and utilization of such waters for power purposes and for other beneficial public uses, including recreational purposes, and the Licensee shall release water from the project reservoir at such rate in cubic feet per second, or such volume in acre-feet per specified period of time, as the Secretary of the Army may prescribe in the interest of navigation, or as the Commission may prescribe for the other purposes hereinbefore mentioned.
Article 13. On the application of any person, association, corporation, Federal agency, State or municipality, the Licensee shall permit such reasonable use of its reservoir or other project properties, including works, lands and water rights, or parts thereof, as may be ordered by the Commission, after notice and opportunity for hearing, in the interests of comprehensive development of the waterway or waterways involved and the conservation and utilization of the water resources of the region for water supply or for the purposes of steam-electric, irrigation, industrial, municipal or similar uses. The Licensee shall receive reasonable compensation for use of its reservoir or other project properties or parts thereof for such purposes, to include at least full reimbursement for any damages or expenses which the joint use causes the Licensee to incur. Any such compensation shall be fixed by the Commission either by approval of an agreement between the Licensee and the party or parties benefiting or after notice and opportunity for hearing. Applications shall contain information in sufficient detail to afford a full understanding of the proposed use, including satisfactory evidence that the applicant possesses necessary water rights pursuant to applicable State law, or a showing of cause why such evidence cannot concurrently be submitted, and a statement as to the relationship of the proposed use to any State or municipal plans or orders which may have been adopted with respect to the use of such waters.
Article 14. In the construction or maintenance of the project works, the Licensee shall place and maintain suitable structures and devices to reduce to a reasonable degree the liability of contact between its transmission lines and telegraph, telephone and other signal wires or power transmission lines constructed prior to its transmission lines and not owned by the Licensee, and shall also place and maintain suitable structures and devices to reduce to a reasonable degree the liability of any structures or wires falling or obstructing traffic or endangering life. None of the provisions of this article are intended to relieve the Licensee from any responsibility or requirement which may be imposed by any other lawful authority for avoiding of eliminating inductive interference.
Article 15. The Licensee shall, for the conservation and development of fish and wildlife resources, construct, maintain, and operate, or arrange for the construction, maintenance, and operation of such reasonable facilities, and comply with such reasonable modifications of the project structures and operation, as may be ordered by the Commission upon its own motion or upon the recommendation of the Secretary of the Interior or the fish and wildlife agency or agencies of any State in which the project or a part thereof is located, after notice and opportunity for hearing.
Article 16. Whenever the United States shall desire, in connection with the project, to construct fish and wildlife facilities or to improve the existing fish and wildlife facilities at its own expense, the Licensee shall permit the United States or its designated agency to use, free of cost, such of the Licensee's lands and interests in lands, reservoirs, waterways and project works as may be reasonably required to complete such facilities or such improvements thereof. In addition, after notice and opportunity for hearing, the Licensee shall modify the project operation as may be reasonably prescribed by the Commission in order to permit the maintenance and operation of the fish and wildlife facilities constructed or improved by the United States under the provisions of this article. This article shall not be interpreted to place any obligation on the United States to construct or improve fish and wildlife facilities or to relieve the Licensee of any obligation under this license.
Article 17. The Licensee shall construct, maintain, and operate, or shall arrange for the construction, maintenance, and operation of such reasonable recreational facilities, including modifications thereto, such as access roads, wharves, launching ramps, beaches, picnic and camping areas, sanitary facilities, and utilities, giving consideration to the needs of the physically handicapped, and shall comply with such reasonable modifications of the project, as may be prescribed hereafter by the Commission during the term of this license upon its own motion or upon the recommendation of the Secretary of the Interior or other interested Federal or State agencies, after notice and opportunity for hearing.
Article 18. So far as is consistent with proper operation of the project, the Licensee shall allow the public free access, to a reasonable extent, to project waters and adjacent project lands owned by the Licensee for the purpose of full public utilization of such lands and waters for navigation and for outdoor recreational purposes, including fishing and hunting: Provided, That the Licensee may reserve from public access such portions of the project waters, adjacent lands, and project facilities as may be necessary for the protection of life, health, and property.
Article 19. In the construction, maintenance, or operation of the project, the Licensee shall be responsible for, and shall take reasonable measures to prevent, soil erosion on lands adjacent to streams or other waters, stream sedimentation, and any form of water or air pollution. The Commission, upon request or upon its own motion, may order the Licensee to take such measures as the Commission finds to be necessary for these purposes, after notice and opportunity for hearing.
Article 20. The Licensee shall clear and keep clear to an adequate width lands along open conduits and shall dispose of all temporary structures, unused timber, brush, refuse, or other material unnecessary for the purposes of the project which results from the clearing of lands or from the maintenance or alteration of the project works. In addition, all trees along the periphery of project reservoirs which may die during operations of the project shall be removed. All clearing of the lands and disposal of the unnecessary material shall be done with due diligence and to the satisfaction of the authorized representatives of the Commission and in accordance with appropriate Federal, State, and local statutes and regulations.
Article 21. Material may be dredged or excavated from, or placed as fill in, project lands and/or waters only in the prosecution of work specifically authorized under the license; in the maintenance of the project; or after obtaining Commission approval, as appropriate. Any such material shall be removed and/or deposited in such manner as to reasonably preserve the environmental values of the project and so as not to interfere with traffic on land or water. Dredging and filling in a navigable water of the United States shall also be done to the satisfaction of the District Engineer, Department of the Army, in charge of the locality.
Article 22. Whenever the United States shall desire to construct, complete, or improve navigation facilities in connection with the project, the Licensee shall convey to the United States, free of cost, such of its lands and rights-of-way and such rights of passage through its dams or other structures, and shall permit such control of its pools, as may be required to complete and maintain such navigation facilities.
Article 23. The operation of any navigation facilities which may be constructed as a part of, or in connection with, any dam or diversion structure constituting a part of the project works shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including control of the level of the pool caused by such dam or diversion structure, as may be made from time to time by the Secretary of the Army.
Article 24. The Licensee shall furnish power free of cost to the United States for the operation and maintenance of navigation facilities in the vicinity of the project at the voltage and frequency required by such facilities and at a point adjacent thereto, whether said facilities are constructed by the Licensee or by the United States.
Article 25. The Licensee shall construct, maintain, and operate at its own expense such lights and other signals for the protection of navigation as may be directed by the Secretary of the Department in which the Coast Guard is operating.
Article 26. If the Licensee shall cause or suffer essential project property to be removed or destroyed or to become unfit for use, without adequate replacement, or shall abandon or discontinue good faith operation of the project or refuse or neglect to comply with the terms of the license and the lawful orders of the Commission mailed to the record address of the Licensee or its agent, the Commission will deem it to be the intent of the Licensee to surrender the license. The Commission, after notice and opportunity for hearing, may require the Licensee to remove any or all structures, equipment and power lines within the project boundary and to take any such other action necessary to restore the project waters, lands, and facilities remaining within the project boundary to a condition satisfactory to the United States agency having jurisdiction over its lands or the Commission's authorized representative, as appropriate, or to provide for the continued operation and maintenance of nonpower facilities and fulfill such other obligations under the license as the Commission may prescribe. In addition, the Commission in its discretion, after notice and opportunity for hearing, may also agree to the surrender of the license when the Commission, for the reasons recited herein, deems it to be the intent of the Licensee to surrender the license.
Article 27. The right of the Licensee and of its successors and assigns to use or occupy waters over which the United States has jurisdiction, or lands of the United States under the license, for the purpose of maintaining the project works or otherwise, shall absolutely cease at the end of the license period, unless the Licensee has obtained a new license pursuant to the then existing laws and regulations, or an annual license under the terms and conditions of this license.
Article 28. The terms and conditions expressly set forth in the license shall not be constructed as impairing any terms and conditions of the Federal Power Act which are not expressly set forth herein.
Federal Energy Regulatory Commission
Form L-4 (Revised October, 1975)
terms and conditions of license for unconstructed major project affecting navigable waters of the united states
Article 1. The entire project, as described in this order of the Commission, shall be subject to all of the provisions, terms, and conditions of the license.
Article 2. No substantial change shall be made in the maps, plans, specifications, and statements described and designated as exhibits and approved by the Commission in its order as a part of the license until such change shall have been approved by the Commission: Provided, however, That if the Licensee or the Commission deems it necessary or desirable that said approved exhibits, or any of them, be changed, there shall be submitted to the Commission for approval a revised, or additional exhibit or exhibits covering the proposed changes which, upon approval by the Commission, shall become a part of the license and shall supersede, in whole or in part, such exhibit or exhibits theretofore made a part of the license as may be specified by the Commission.
Article 3. The project works shall be constructed in substantial conformity with the approved exhibits referred to in Article 2 herein or as changed in accordance with the provisions of said article. Except when emergency shall require for the protection of navigation, life, health, or property, there shall not be made without prior approval of the Commission any substantial alteration or addition not in conformity with the approved plans to any dam or other project works under the license or any substantial use of project lands and waters not authorized herein; and any emergency alteration, addition, or use so made shall thereafter be subject to such modification and change as the Commission may direct. Minor changes in project works, or in uses of project lands and waters, or divergence from such approved exhibits may be made if such changes will not result in a decrease in efficiency, in a material increase in cost, in an adverse environmental impact, or in impairment of the general scheme of development; but any of such minor changes made without the prior approval of the Commission, which in its judgment have produced or will produce any of such results, shall be subject to such alteration as the Commission may direct.
Upon the completion of the project, or at such other time as the Commission may direct, the Licensee shall submit to the Commission for approval revised exhibits insofar as necessary to show any divergence from or variations in the project area and project boundary as finally located or in the project works as actually constructed when compared with the area and boundary shown and the works described in the license or in the exhibits approved by the Commission, together with a statement in writing setting forth the reasons which in the opinion of the Licensee necessitated or justified variation in or divergence from the approved exhibits. Such revised exhibits shall, if and when approved by the Commission, be made a part of the license under the provisions of Article 2 hereof.
Article 4. The construction, operation, and maintenance of the project and any work incidental to additions or alterations shall be subject to the inspection and supervision of the Regional Engineer, Federal Power Commission, in the region wherein the project is located, or of such other officer or agent as the Commission may designate, who shall be the authorized representative of the Commission for such purposes. The Licensee shall cooperate fully with said representative and shall furnish him a detailed program of inspection by the Licensee that will provide for an adequate and qualified inspection force for construction of the project and for any subsequent alterations to the project. Construction of the project works or any feature or alterations thereof shall not be initiated until the program of inspection for the project works or any such feature thereof has been approved by said representative. The Licensee shall also furnish to said representative such further information as he may require concerning the construction, operation, and maintenance of the project, and of any alteration thereof, and shall notify him of the date upon which work will begin, as far in advance thereof as said representative may reasonably specify, and shall notify him promptly in writing of any suspension of work for a period of more than one week, and of its resumption and completion. The Licensee shall allow said representative and other officers or employees of the United States, showing proper credentials, free and unrestricted access to, through, and across the project lands and project works in the performance of their official duties. The Licensee shall comply with such rules and regulations of general or special applicability as the Commission may prescribe from time to time for the protection of life, health, or property.
Article 5. The Licensee, within 5 years from the date of issuance of the license, shall acquire title in fee or other right to use in perpetuity all lands, other than lands of the United States, necessary or appropriate for the construction, maintenance, and operation of the project. The Licensee or its successors and assigns shall, during the period of the license, retain the possession of all project property covered by the license as issued or as later amended, including the project area, the project works, and all franchises, easements, water and rights of occupancy and use; and none of such properties shall be voluntarily sold, leased, transferred, abandoned, or otherwise disposed of without the prior written approval of the Commission, except that the Licensee may lease or otherwise dispose of interests in project lands or property without specific written approval of the Commission pursuant to the then current regulations of the Commission. The provisions of this article are not intended to prevent the abandonment or the retirement from service of structures, equipment, or other project works in connection with replacements thereof when they become obsolete, inadequate, or inefficient for further service due to wear and tear; and mortgage or trust deeds or judicial sales made thereunder, or tax sales, shall not be deemed voluntary transfers within the meaning of this article.
Article 6. In the event the project is taken over by the United States upon the termination of the license as provided in Section 14 of the Federal Power Act, or is transferred to a new licensee or to a non-power licensee under the provisions of Section 15 of said Act, the Licensee, its successors and assigns shall be responsible for, and shall make good any defect of title to, or of right of occupancy and use in, any of such project property that is necessary or appropriate or valuable and serviceable in the maintenance and operation of the project, and shall pay and discharge, or shall assume responsibility for payment and discharge of, all liens or encumbrances upon the project or project property created by the Licensee or created or incurred after the issuance of the License: Provided, That the provisions of this article are not intended to require the Licensee, for the purpose of transferring the project to the United States or to a new licensee, to acquire any different title to, or right of occupancy and use in, any of such project property than was necessary to acquire for its own purposes as the Licensee.
Article 7. The actual legitimate original cost of the project, and of any addition thereto or betterment thereof, shall be determined by the Commission in accordance with the Federal Power Act and the Commission's Rules and Regulations thereunder.
Article 8. The Licensee shall install and thereafter maintain gages and stream-gaging stations for the purpose of determining the stage and flow of the stream or streams on which the project is located, the amount of water held in and withdrawn from storage, and the effective head on the turbines; shall provide for the required reading of such gages and for the adequate rating of such stations; and shall install and maintain standard meters adequate for the determination of the amount of electric energy generated by the project works. The number, character, and location of gages, meters, or other measuring devices, and the method of operation thereof, shall at all times be satisfactory to the Commission or its authorized representative. The Commission reserves the right, after notice and opportunity for hearing, to require such alterations in the number, character, and location of gages, meters, or other measuring devices, and the method of operation thereof, as are necessary to secure adequate determinations. The installation of gages, the rating of said stream or streams, and the determination of the flow thereof, shall be under the supervision of, or in cooperation with, the District Engineer of the United States Geological Survey having charge of stream-gaging operations in the region of the project, and the Licensee shall advance to the United States Geological Survey the amount of funds estimated to be necessary for such supervision, or cooperation for such periods as may be mutually agreed upon. The Licensee shall keep accurate and sufficient records of the foregoing determinations to the satisfaction of the Commission, and shall make return of such records annually at such time and in such form as the Commission may prescribe.
Article 9. The Licensee shall, after notice and opportunity for hearing, install additional capacity or make other changes in the project as directed by the Commission, to the extent that it is economically sound and in the public interest to do so.
Article 10. The Licensee shall, after notice and opportunity for hearing, coordinate the operation of the project, electrically and hydraulically, with such other projects or power systems and in such manner as the Commission may direct in the interest of power and other beneficial public uses of water resources, and on such conditions concerning the equitable sharing of benefits by the Licensee as the Commission may order.
Article 11. Whenever the Licensee is directly benefited by the construction work of another licensee, a permittee, or the United States on a storage reservoir or other headwater improvement, the Licensee shall reimburse the owner of the headwater improvement for such part of the annual charges for interest, maintenance, and depreciation thereof as the Commission shall determine to be equitable, and shall pay to the United States the cost of making such determination as fixed by the Commission. For benefits provided by a storage reservoir or other headwater improvement of the United States, the Licensee shall pay to the Commission the amounts for which it is billed from time to time for such headwater benefits and for the cost of making the determinations pursuant to the then current regulations of the Commission under the Federal Power Act.
Article 12. The United States specifically retains and safeguards the right to use water in such amount, to be determined by the Secretary of the Army, as may be necessary for the purposes of navigation on the navigable waterway affected; and the operations of the Licensee, so far as they affect the use, storage and discharge from storage of waters affected by the license, shall at all times be controlled by such reasonable rules and regulations as the Secretary of the Army may prescribe in the interest of navigation, and as the Commission may prescribe for the protection of life, health, and property, and in the interest of the fullest practicable conservation and utilization of such waters for power purposes and for other beneficial public uses, including recreational purposes, and the Licensee shall release water from the project reservoir at such rate in cubic feet per second, or such volume in acre-feet per specified period of time, as the Secretary of the Army may prescribe in the interest of navigation, or as the Commission may prescribe for the other purposes hereinbefore mentioned.
Article 13. On the application of any person, association, corporation, Federal agency, State or municipality, the Licensee shall permit such reasonable use of its reservoir or other project properties, including works, lands and water rights, or parts thereof, as may be ordered by the Commission, after notice and opportunity for hearing, in the interests of comprehensive development of the waterway or waterways involved and the conservation and utilization of the water resources of the region for water supply or for the purposes of steam-electric, irrigation, industrial, municipal or similar uses. The Licensee shall receive reasonable compensation for use of its reservoir or other project properties or parts thereof for such purposes, to include at least full reimbursement for any damages or expenses which the joint use causes the Licensee to incur. Any such compensation shall be fixed by the Commission either by approval of an agreement between the Licensee and the party or parties benefiting or after notice and opportunity for hearing. Applications shall contain information in sufficient detail to afford a full understanding of the proposed use, including satisfactory evidence that the applicant possesses necessary water rights pursuant to applicable State law, or a showing of cause why such evidence cannot concurrently be submitted, and a statement as to the relationship of the proposed use to any State or municipal plans or orders which may have been adopted with respect to the use of such waters.
Article 14. In the construction or maintenance of the project works, the Licensee shall place and maintain suitable structures and devices to reduce to a reasonable degree the liability of contact between its transmission lines and telegraph, telephone and other signal wires or power transmission lines constructed prior to its transmission lines and not owned by the Licensee, and shall also place and maintain suitable structures and devices to reduce to a reasonable degree the liability of any structures or wires falling or obstructing traffic or endangering life. None of the provisions of this article are intended to relieve the Licensee from any responsibility or requirement which may be imposed by any other lawful authority for avoiding or eliminating inductive interference.
Article 15. The Licensee shall, for the conservation and development of fish and wildlife resources, construct, maintain, and operate, or arrange for the construction, maintenance, and operation of such reasonable facilities, and comply with such reasonable modifications of the project structures and operation, as may be ordered by the Commission upon its own motion or upon the recommendation of the Secretary of the Interior or the fish and wildlife agency or agencies of any State in which the project or a part thereof is located, after notice and opportunity for hearing.
Article 16. Whenever the United States shall desire, in connection with the project, to construct fish and wildlife facilities or to improve the existing fish and wildlife facilities at its own expense, the Licensee shall permit the United States or its designated agency to use, free of cost, such of the Licensee's lands and interests in lands, reservoirs, waterways and project works as may be reasonably required to complete such facilities or such improvements thereof. In addition, after notice and opportunity for hearing, the Licensee shall modify the project operation as may be reasonably prescribed by the Commission in order to permit the maintenance and operation of the fish and wildlife facilities constructed or improved by the United States under the provisions of this article. This article shall not be interpreted to place any obligation on the United States to construct or improve fish and wildlife facilities or to relieve the Licensee of any obligation under this license.
Article 17. The Licensee shall construct, maintain, and operate, or shall arrange for the construction, maintenance, and operation of such reasonable recreational facilities, including modifications thereto, such as access roads, wharves, launching ramps, beaches, picnic and camping areas, sanitary facilities, and utilities, giving consideration to the needs of the physically handicapped, and shall comply with such reasonable modifications of the project, as may be prescribed hereafter by the Commission during the term of this license upon its own motion or upon the recommendation of the Secretary of the Interior or other interested Federal or State agencies, after notice and opportunity for hearing.
Article 18. So far as is consistent with proper operation of the project, the Licensee shall allow the public free access, to a reasonable extent, to project waters and adjacent project lands owned by the Licensee for the purpose of full public utilization of such lands and waters for navigation and for outdoor recreational purposes, including fishing and hunting: Provided, That the Licensee may reserve from public access such portions of the project waters, adjacent lands, and project facilities as may be necessary for the protection of life, health, and property.
Article 19. In the construction, maintenance, or operation of the project, the Licensee shall be responsible for, and shall take reasonable measures to prevent, soil erosion on lands adjacent to streams or other waters, stream sedimentation, and any form of water or air pollution. The Commission, upon request or upon its own motion, may order the Licensee to take such measures as the Commission finds to be necessary for these purposes, after notice and opportunity for hearing.
Article 20. The Licensee shall consult with the appropriate State and Federal agencies and, within one year of the date of issuance of this license, shall submit for Commission approval a plan for clearing the reservoir area. Further, the Licensee shall clear and keep clear to an adequate width lands along open conduits and shall dispose of all temporary structures, unused timber, brush, refuse, or other material unnecessary for the purposes of the project which results from the clearing of lands or from the maintenance or alteration of the project works. In addition, all trees along the periphery of project reservoirs which may die during operations of the project shall be removed. Upon approval of the clearing plan all clearing of the lands and disposal of the unnecessary material shall be done with due diligence and to the satisfaction of the authorized representative of the Commission and in accordance with appropriate Federal, State, and local statutes and regulations.
Article 21. Material may be dredged or excavated from, or placed as fill in, project lands and/or waters only in the prosecution of work specifically authorized under the license; in the maintenance of the project; or after obtaining Commission approval, as appropriate. Any such material shall be removed and/or deposited in such manner as to reasonably preserve the environmental values of the project and so as not to interfere with traffic on land or water. Dredging and filling in a navigable water of the United States shall also be done to the satisfaction of the District Engineer, Department of the Army, in charge of the locality.
Article 22. Whenever the United States shall desire to construct, complete, or improve navigation facilities in connection with the project, the Licensee shall convey to the United States, free of cost, such of its lands and rights-of-way and such rights of passage through its dams or other structures, and shall permit such control of its pools, as may be required to complete and maintain such navigation facilities.
Article 23. The operation of any navigation facilities which may be constructed as a part of, or in connection with, any dam or diversion structure constituting a part of the project works shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including control of the level of the pool caused by such dam or diversion structure, as may be made from time to time by the Secretary of the Army.
Article 24. The Licensee shall furnish power free of cost to the United States for the operation and maintenance of navigation facilities in the vicinity of the project at the voltage and frequency required by such facilities and at a point adjacent thereto, whether said facilities are constructed by the Licensee or by the United States.
Article 25. The Licensee shall construct, maintain, and operate at its own expense such lights and other signals for the protection of navigation as may be directed by the Secretary of the Department in which the Coast Guard is operating.
Article 26. If the Licensee shall cause or suffer essential project property to be removed or destroyed or to become unfit for use, without adequate replacement, or shall abandon or discontinue good faith operation of the project or refuse or neglect to comply with the terms of the license and the lawful orders of the Commission mailed to the record address of the Licensee or its agent, the Commission will deem it to be the intent of the Licensee to surrender the license. The Commission, after notice and opportunity for hearing, may require the Licensee to remove any or all structures, equipment and power lines within the project boundary and to take any such other action necessary to restore the project waters, lands, and facilities remaining within the project boundary to a condition satisfactory to the United States agency having jurisdiction over its lands or the Commission's authorized representative, as appropriate, or to provide for the continued operation and maintenance of nonpower facilities and fulfill such other obligations under the license as the Commission may prescribe. In addition, the Commission in its discretion, after notice and opportunity for hearing, may also agree to the surrender of the license when the Commission, for the reasons recited herein, deems it to be the intent of the Licensee to surrender the license.
Article 27. The right of the Licensee and of its successors and assigns to use or occupy waters over which the United States has jurisdiction, or lands of the United States under the license, for the purpose of maintaining the project works or otherwise, shall absolutely cease at the end of the license period, unless the Licensee has obtained a new license pursuant to the then existing laws and regulations, or an annual license under the terms and conditions of this license.
Article 28. The terms and conditions expressly set forth in the license shall not be construed as impairing any terms and conditions of the Federal Power Act which are not expressly set forth herein.
List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects
The following FPC standard articles Forms, in addition to the standard Forms L-3, and L-4 which are provided in this appendix, are available from the FPC offices:
FPC Forms 1 | Title
P-1 | Terms and conditions of preliminary permit.
L-1 | Terms and conditions of license for constructed major project affecting lands of the United States.
L-2 | Terms and conditions of license for unconstructed major project affecting lands of the United States.
L-5 | Terms and conditions of license for constructed major projects affecting navigable waters and lands of the United States.
L-6 | Terms and conditions of license for unconstructed major project affecting navigable waters and lands of the United States.
L-9 | Terms and conditions of license for constructed minor projects affecting navigable waters of the United States.
L-10 | Terms and conditions of license for constructed major project affecting the interests of interstate or foreign commerce.
L-11 | Terms and conditions of license for unconstructed major project affecting the interests of interstate or foreign commerce.
L-14 | Terms and conditions of license for unconstructed minor project affecting navigable waters of the United States.
L-15 | Terms and conditions of license for unconstructed minor project affecting the interests of interstate or foreign commerce.
L-16 | Terms and conditions of license for constructed minor project affecting lands of the United States.
L-17 | Terms and conditions of license for unconstructed minor project affecting lands of the United States.
L-18 | Terms and conditions of license for constructed minor project affecting navigable waters and lands of the United States.
L-19 | Terms and conditions of license for unconstructed minor project affecting navigable waters and lands of the United States.
1 Revised Oct. 1975.
PART 222 ENGINEERING AND DESIGN
Authority: 23 U.S.C. 116(d); delegation in 49 CFR 1.45(b); 33 U.S.C. 467 et seq.; 33 U.S.C. 701, 701b, and 701c-1 and specific legislative authorization Acts and Public Laws listed in appendix E of § 222.7.
§ 222.2 Acquisition of lands downstream from spillways for hydrologic safety purposes.
(a) Purpose. This regulation provides guidance on the acquisition of lands downstream from spillways for the purpose of protecting the public from hazards imposed by spillway discharges. Guidance contained herein is in addition to ER 405-2-150.
(b) Applicability. This regulation is applicable to all OCE elements and all field operating agencies having civil works responsibilities.
(c) Reference. ER 405-2-150.
(d) Discussion. A policy of public safety awareness will be adhered to in all phases of design and operation of dam and lake projects to assure adequate security for the general public in areas downstream from spillways. A real estate interest will be required in those areas downstream of a spillway where spillway discharge could create or significantly increase a hazardous condition. The real estate interest will extend downstream to where the spillway discharge would not significantly increase hazards. A real estate interest is not required in areas where flood conditions would clearly be nonhazardous.
(e) Hydrologic criteria. The construction and operation of a dam and spillway may create or aggravate a potential hazard in the spillway discharge area. Therefore, an appropriate solution should be developed in a systematic manner. All pertinent facts need to be considered to assure that the risk to non-Federal interests does not exceed conditions that would prevail without the project. General hydrologic engineering considerations are as follows:
(1) Probability of spillway use. Pool elevation versus probability of filling relationships can change materially after initial construction. Spillway use may be more frequent than anticipated. The infrequent use of a spillway is not a basis for the lack of adequate downstream real estate interest.
(2) Changes in project functions. Water resource needs within river basins change and pool levels may be adjusted to provide more conservation storage, particularly when high-level limited-service spillways are provided. Such changes normally increase spillway use and are to be considered.
(3) Volume and velocity of spillway flow. The amount of flow and destructive force of the flow from a spillway during floods up to the spillway design flood can vary from insignificant to extremely hazardous magnitudes. The severity and area of hazard associated with spillway discharge will vary depending on specific project site conditions. Therefore, the hazard is to be analyzed on a project-by-project basis.
(4) Development within floodway. If development within the floodway downstream from a spillway is not present at the time of project construction, the existence of the reservoir may encourage development. Adverse terrain conditions do not preclude development. Sparse present development is not a basis for lack of real estate acquisition.
(5) Debris movement within floodway. The availability of erodible material in a spillway flow area intensifies the hazards of spillway flow. In fact, debris may be transported to downstream areas that otherwise would not be adversely affected. Extreme erosion may result from high velocities and turbulence. Both debris and erosion must be evaluated and considered.
(6) Flood warning and response potential. Small projects generally have short time periods available to warn downstream inhabitants and may be unattended prior to spillway use. The ability to convince individuals to leave most of their worldly possessions to the ravages of spillway flow may be severely limited. In some cases flood warning systems may be necessary; however, this subject is beyond the scope of this regulation. Warning systems are not an adequate substitute for a real estate interest in lands downstream of spillways.
(7) Location of spillway. Spillways should be located to minimize the hazards associated with their discharge and the total project cost (cost of spillway structure and downstream lands). Spillways, outlet works, stilling basins, and outlet channels should be designed to minimize hazards to downstream interest insofar as is engineeringly and economically reasonable.
(f) Real estate. The real estate interest required downstream of spillways will be adequate to assure carrying out project purposes and to protect non-Federal interest from hazards created by spillway flows. The interest may be either fee or permanent easement. A permanent easement must exclude all overnight and/or permanent habitation, structures subject to damage by spillway flows and activities that would increase the potential hazards. No real estate interest is required for:
(1) Areas where the imposed or aggravated flood condition is non-hazardous. Affected interest should be informed of the nature of the imposed non-hazardous flood condition.
(2) Areas where the construction and operation of a dam and spillway do not increase or create a hazardous condition.
(g) Alternative land uses. In some cases land downstream from spillways can be effectively used for purposes other than hydrologic safety. Therefore, the entire cost of these lands may not be an additional project cost. For example, the lands downstream of a spillway may be used for wildlife management essential to project purposes in lieu of other lands suitable for similar purposes at another location.
(h) Procedural guidance. Procedures regarding the application of the principles outlined in the above paragraphs are as follows:
(1) For various flood magnitudes up to the probable maximum flood determine the “with” and “without project” flood conditions downstream of a dam spillway for the following:
(i) Flooded area.
(ii) Flood depth.
(iii) Flood duration.
(iv) Velocities.
(v) Debris and erosion.
(2) Determine the combinations of flood magnitudes and the above flood conditions that could be the most hazardous and/or result in the greatest increase in hazard from “without” to “with project” flood conditions. Designate these combinations of flood magnitude and flood conditions as the critical conditions.
(3) For the critical conditions selected above outline the areas where the project could increase and/or create (impose) one or more of the critical conditions. Areas where spillway flows do not create or increase flood conditions are excluded from further analysis.
(4) Determine where the imposed critical conditions as outlined above would be hazardous and non-hazardous. Non-hazardous areas are defined as those areas where:
(i) Flood depths are maximum of 2 feet in urban and rural areas.
(ii) Flood depths are essentially non-damaging to urban property.
(iii) Flood durations are a maximum of 3 hours in urban areas and 24 hours in agricultural areas.
(iv) Velocities do not exceed 4 feet per second.
(v) Debris and erosion potentials are minimal.
(vi) Imposed flood conditions would be infrequent. That is, the exceedence frequency should be less than 1 percent. Hazardous areas are those where any of the above criteria are exceeded.
(5) Based upon the information developed above and the principles outlined in paragraphs (c) through (f) of this section, decide on the extent of area and estate required for hydrologic safety purposes.
(i) Reporting. Lands to be acquired downstream from spillways and intended purposes will be identified and the cost included in feasibility reports and real estate design memoranda. Additional specific information in support of land acquisition should be provided in Phase I or Phase II general design memoranda (GDM) and dam modernization reports. This information should include topographic maps, area flooded maps, velocities, erosion and debris areas “with” and “without” the project. Real estate boundaries and discussions of items in paragraph (h)(4) are also essential in the GDM's and dam modernization reports.
[43 FR 35481, Aug. 10, 1978. Redesignated at 60 FR 19851, Apr. 21, 1995]
§ 222.3 Clearances for power and communication lines over reservoirs.
(a) Purpose. This regulation prescribes the minimum vertical clearances to be provided when relocating existing or constructing new power and communication lines over waters of reservoir projects.
(b) Applicability. This regulation applies to all field operating agencies having Civil Works responsibilities.
(c) References. (1) ER 1180-1-1 (Section 73).
(2) National Electrical Safety Code (ANSI C2), available from IEEE Service Center, 445 Hoes Lane, Piscataway, N.J. 08854.
(d) Definitions—(1) Design high water level. The design high water level above which clearances are to be provided shall be either: (i) The elevation of the envelope profile of the 50 year flood, or flood series, routed through the reservoir with a full conservation pool after 50 years of sedimentation, or (ii) the elevation of the top of the flood control pool, whichever is higher.
(2) Low point of line. The low point of the line shall be the elevation of the lowest point of the line taking into consideration all factors including temperature, loading and length of spans as outlined in the National Electrical Safety Code.
(3) Minimum vertical clearance. The minimum vertical clearance shall be the distance from the design high water lever (paragraph (d)(1) of this section) to the low point of the line (paragraph (d)(2) of this section).
(e) Required clearances. Minimum vertical clearances for power and communication lines over reservoirs shall not be less than required by section 23, rule 232 of the latest revision of the National Electrical Safety Code (ANSI C2).
(1) In general, minimum vertical clearances shall not be less than shown in Table 232-1, Item 7, of ANSI C2, even for reservoirs or areas not suitable for sailboating or where sailboating is prohibited.
(2) If clearances not in accordance with Table 232-1 of ANSI C2 are proposed, justification for the clearances should be provided.
(f) Navigable waters. For parts of reservoirs that are designated as navigable waters of the United States, greater clearances will be provided if so required. The clearances required over navigable waters are covered by 33 CFR 322.5(i)(2) and are not affected by this regulation.
[43 FR 14013, Apr. 4, 1978. Redesignated at 60 FR 19851, Apr. 21, 1995]
§ 222.4 Reporting earthquake effects.
(a) Purpose. This regulation states policy, defines objectives, assigns functions, and establishes procedures for assuring the structural integrity and operational adequacy of major Civil Works structures following the occurrence of significant earthquakes. It primarily concerns damage surveys following the occurrences of earthquakes.
(b) Applicability. This regulation is applicable to all field operating agencies having Civil Works responsibilities.
(c) References. (1) ER 1110-2-100 (§ 222.2).
(2) ER 1110-2-1806.
(3) ER 1110-2-8150.
(4) ER 1130-2-419.
(5) State-of-the-Art for Assessing Earthquake Hazards in the United States—WES Miscellaneous Papers S-73-1—Reports 1 thru 14. Available from U.S. Army Engineer Waterways Experiment Station, P.O. Box 631, Vicksburg, Mississippi 39180.
(d) Policy. Civil Works structures which could be caused to fail or partially fail by an earthquake and whose failure or partial failure would endanger the lives of the public and/or cause substantial property damage, will be evaluated following potentially damaging earthquakes to insure their continued structural stability, safety and operational adequacy. These structures include dams, navigation locks, powerhouses, and appurtenant structures, (intakes, outlet works, buildings, tunnels, paved spillways) which are operated by the Corps of Engineers and for which the Corps is fully responsible. Also included are major levees, floodwalls, and similar facilities designed and constructed by the Corps of Engineers and for whose structural safety and stability the Corps has a public obligation to be aware of although not responsible for their maintenance and operation. The evaluation of these structures will be based upon post-earthquake inspections which will be conducted to detect conditions of significant structural distress and to provide a basis for timely initiation of restorative and remedial measures.
(e) Post-earthquake inspections and evaluation surveys—(1) Limitations of present knowledge. The design of structures for earthquake loading is limited by the infrequent opportunity to compare actual performance with the design. Damage which would affect the function of the project is unlikely if peak accelerations are below 0.1g.; but it cannot be assumed that a structure will not be damaged from earthquake loadings below that for which it was designed. Furthermore, earthquakes have occurred in several parts of the country where significant seismic activity had not been predicted by some seismic zoning maps. This indicates the possibility that earthquake induced loads may not have been adequately considered in the design of older structures.
(2) Types of reportable damage. Many types of structural damage can be induced by ground motion from earthquakes or from large nuclear blasts (which also tend to induce ground vibrations in the more damaging lower frequency ranges). Any post-earthquake change in appearance or functional capability of a major Civil Works structure should be evaluated and reported. Examples are symptoms of induced stresses in buildings made evident by cracked plaster, windows or tile, or in binding of doors or windows; cracked or shifted bridge pier footings or other concrete structures; turbidity or changed static level of water wells; cracks in concrete dams or earth embankments; and misalignment of hydraulic control structures or gates. Induced dynamic loading on earth dams may result in loss of freeboard by settlement, or cause localized quick conditions within the embankment sections or earth foundations. Also, new seepage paths may be opened up within the foundation or through the embankment section. Ground motion induced landslides may occur in susceptible areas of the reservoir rim, causing embankment overtopping by waves and serious damage. All such unusual conditions should be evaluated and reported.
(f) Inspection and evaluation programs. (1) If the project is located in an area where the earthquake causes significant damage (Modified Mercalli Intensity VII or greater) to structures in the vicinity, the Chief, Engineering Division, should be immediately notified and an engineering evaluation and inspection team should be sent to the project.
(2) If the project is located in an area where the earthquake is felt but causes no or insignificant damage (Modified Mercalli Intensity VI or less) to structures in the vicinity of the project, project operations personnel should make an immediate inspection. This inspection should determine: (i) Whether there is evidence of earthquake damage or disturbance, and (ii) whether seismic instrumentation, where present, has been triggered. The Chief, Engineering Division should be notified by phone of the results of the inspection. If damage is observed, which is considered to threaten the immediate safety or operational capability of the project, immediate action should be taken as covered in paragraph (f)(1) of this section. For other situations, the Chief of Engineering Division will determine the need for and urgency for an engineering inspection.
(3) When an engineering inspection of structures is deemed necessary following a significant earthquake, HQDA (DAEN-CWE) WASH DC 20314 will be notified of the inspection program as soon as it is established.
(4) As a general rule, the structures which would be of concern following an earthquake are also the structures which are involved in the inspection program under ER 1110-2-100. Whenever feasible, instrumentation and prototype testing programs undertaken under ER 1110-2-100 to monitor structural performance and under ER 1110-2-8150 to develop design criteria will be utilized in the post-earthquake safety evaluation programs. Additional special types of instrumentation will be incorporated in selected structures in which it may be desirable to measure forces, pressures, loads, stresses, strains, displacements, deflections, or other conditions relating to damage and structural safety and stability in case of an earthquake.
(5) Where determined necessary, a detailed, systematic engineering inspection will be made of the post-earthquake condition of each structure, taking into account its distinctive features. For structures which have incurred earthquake damage a formal technical report will be prepared in a format similar to inspection reports required under ER 1110-2-100. (Exempt from requirements control under paragraph 7-2b, AR 335-15.) The report will include summaries of the instrumentation and other observation data for each inspection, for permanent record and reference purposes. This report will be used to form a basis for major remedial work when required. Where accelerometers or other types of strong motion instruments have been installed, readings and interpretations from these instruments should also be included in the report. The report will contain recommendations for remedial work when appropriate, and will be transmitted through the Division Engineer for review and to HQDA (DAEN-CWE) WASH DC 20314 for review and approval. For structures incurring no damage a simple statement to this effect will be all that is required in the report, unless seismic instrumentation at the project is activated. (See paragraph (h)(4) of this section.)
(g) Training. The dam safety training program covered by paragraph 6 of ER 1130-2-419 should include post-earthquake inspections and the types of damage operations personnel should look for.
(h) Responsibilities. (1) The Engineering Divisions of the District offices will formulate the inspection program, conduct the post-earthquake inspections, process and analyze the data of instrumental and other observations, evaluate the resulting condition of the structures, and prepare the inspection reports. The Engineering division is also responsible for planning special instrumentation felt necessary in selected structures under this program. Engineering Division is responsible for providing the training discussed in paragraph (g) of this section.
(2) The Construction Divisions of the District offices will be responsible for the installation of the earthquake instrumentation devices and for data collection if an earthquake occurs during the construction period.
(3) The Operations Division of the District offices will be responsible for the immediate assessment of earthquake damage and notifying the Chief, Engineering Division as discussed in paragraphs (f)(1) and (2). The Operations Division will also be responsible for earthquake data collection after the construction period in accordance with the instrumental observation programs, and will assist and participate in the post-earthquake inspections.
(4) The U.S. Geological Survey has the responsibility for servicing and collecting all data from strong motion instrumentation at Corps of Engineers dam projects following an earthquake occurrence. However, the U.S. Army Waterways Experiment Station (WES) is assigned the responsibility for analyzing and interpreting these earthquake data. Whenever a recordable earthquake record is obtained from seismic instrumentation at a Corps project, the Division will send a report of all pertinent instrumentation data to the Waterways Experiment Station, ATTN: WESGH, P.O. Box 631, Vicksburg, Mississippi 39180. The report on each project should include a complete description of the locations and types of instruments and a copy of the instrumental records from each of the strong motion machines activated. (Exempt from requirements control under paragraph 7-2v, AR 335-15).
(5) The Engineering Divisions of the Division offices will select structures for special instrumentation for earthquake effects, and will review and monitor the data collection, processing, evaluating, and inspecting activities. They will also be specifically responsible for promptly informing HQDA (DAEN-CWE) WASH DC 20314, when evaluation of the condition of the structure or analyses of the instrumentation data indicate the stability of a structure is questionable. (Exempt for requirements control under paragraph 7-2o, AR 335-15.)
(6) Division Engineers are responsible for issuing any supplementary regulations necessary to adapt the policies and instructions herein to the specific conditions within their Division.
(i) Funding. Funding for the evaluation and inspection program will be under the Appropriation 96X3123, Operations and Maintenance, General. Funds required for the inspections, including Travel and Per Diem costs incurred by personnel of the Division office or the Office, Chief of Engineers, will be from allocations made to the various projects for the fiscal year in which the inspection occurs.
[44 FR 43469, July 25, 1979. Redesignated at 60 FR 19851, Apr. 21, 1995]
§ 222.5 Water control management (ER 1110-2-240).
(a) Purpose. This regulation prescribes policies and procedures to be followed by the U.S. Army Corps of Engineers in carrying out water control management activities, including establishment of water control plans for Corps and non-Corps projects, as required by Federal laws and directives.
(b) Applicability. This regulation is applicable to all field operating activities having civil works responsibilities.
(c) References. Appendix A lists U.S. Army Corps of Engineers publications and sections of Federal statutes and regulations that are referenced herein.
(d) Authorities—(1) U.S. Army Corps of Engineers projects. Authorities for allocation of storage and regulation of projects owned and operated by the Corps of Engineers are contained in legislative authorization acts and referenced project documents. These public laws and project documents usually contain provisions for development of water control plans, and appropriate revisions thereto, under the discretionary authority of the Chief of Engineers. Some modifications in project operation are permitted under congressional enactments subsequent to original project authorization. Questions that require interpretations of authorizations affecting regulation of specific reservoirs will be referred to CDR USACE (DAEN-CWE-HW), WASH DC 20314, with appropriate background information and analysis, for resolution.
(2) Non-Corps projects. The Corps of Engineers is responsible for prescribing flood control and navigation regulations for certain reservoir projects constructed or operated by other Federal, non-Federal or private agencies. There are several classes of such projects: Those authorized by special acts of Congress; those for which licenses issued by the Federal Energy Regulatory Commission (formerly Federal Power Commission) provide that operation shall be in accordance with instructions of the Secretary of the Army; those covered by agreements between the operating agency and the Corps of Engineers; and those that fall under the terms of general legislative and administrative provisions. These authorities, of illustrative examples, are described briefly in Appendix B.
(e) Terminology: Water control plans and reservoir regulation schedules. (1) Water control plans include coordinated regulation schedules for project/system regulation and such additional provisions as may be required to collect, analyze and disseminate basic data, prepare detailed operating instructions, assure project safety and carry out regulation of projects in an appropriate manner.
(2) The term “reservoir regulation schedule” refers to a compilation of operating criteria, guidelines, rule curves and specifications that govern basically the storage and release functions of a reservoir. In general, schedules indicate limiting rates of reservoir releases required during various seasons of the year to meet all functional objectives of the particular project, acting separately or in combination with other projects in a system. Schedules are usually expressed in the form of graphs and tabulations, supplemented by concise specifications.
(f) General policies. (1) Water control plans will be developed for reservoirs, locks and dams, reregulation and major control structures and interrelated systems to conform with objectives and specific provisions of authorizing legislation and applicable Corps of Engineers reports. They will include any applicable authorities established after project construction. The water control plans will be prepared giving appropriate consideration to all applicable Congressional Acts relating to operation of Federal facilities, i.e., Fish and Wildlife Coordination Act (Pub. L. 85-624), Federal Water Project Recreation Act-Uniform Policies (Pub. L. 89-72), National Environmental Policy Act of 1969 (Pub. L. 91-190), and Clean Water Act of 1977 (Pub. L. 95-217). Thorough analysis and testing studies will be made as necessary to establish the optimum water control plans possible within prevailing constraints.
(2) Necessary actions will be taken to keep approved water control plans up-to-date. For this purpose, plans will be subject to continuing and progressive study by personnel in field offices of the Corps of Engineers. These personnel will be professionally qualified in technical areas involved and familiar with comprehensive project objectives and other factors affecting water control. Organizational requirements for water control management are further discussed in ER 1110-2-1400.
(3) Water control plans developed for specific projects and reservoir systems will be clearly documented in appropriate water control manuals. These manuals will be prepared to meet initial requirements when storage in the reservoir begins. They will be revised as necessary to conform with changing requirements resulting from developments in the project area and downstream, improvements in technology, new legislation and other relevant factors, provided such revisions comply with existing Federal regulations and established Corps of Engineers policy.
(4) Development and execution of water control plans will include appropriate consideration for efficient water management in conformance with the emphasis on water conservation as a national priority. The objectives of efficient water control management are to produce beneficial water savings and improvements in the availability and quality of water resulting from project regulation/operation. Balanced resource use through improved regulation should be developed to conserve as much water as possible and maximize all project functions consistent with project/system management. Continuous examination should be made of regulation schedules, possible need for storage reallocation (within existing authority and constraints) and to identify needed changes in normal regulation. Emphasis should be placed on evaluating conditions that could require deviation from normal release schedules as part of drought contingency plans (ER 1110-2-1941).
(5) Adequate provisions for collection, analysis and dissemination of basic data, the formulation of specific project regulation directives, and the performance of project regulation will be established at field level.
(6) Appropriate provisions will be made for monitoring project operations, formulating advisories to higher authorities, and disseminating information to others concerned. These actions are required to facilitate proper regulation of systems and to keep the public fully informed regarding all pertinent water control matters.
(7) In development and execution of water control plans, appropriate attention will be given to project safety in accordance with ER 1130-2-417 and ER 1130-2-419 so as to insure that all water impounding structures are operated for the safety of users of the facilities and the general public. Care will be exercised in the development of reservoir regulation schedules to assure that controlled releases minimize project impacts and do not jeopardize the safety of persons engaged in activities downstream of the facility. Water control plans will include provisions for issuing adequate warnings or otherwise alerting all affected interests to possible hazards from project regulation activities.
(8) In carrying out water control activities, Corps of Engineers personnel must recognize and observe the legal responsibility of the National Weather Service (NWS), National Oceanic and Atmospheric Administration (NOAA), for issuing weather forecasts and flood warnings, including river discharges and stages. River forecasts prepared by the Corps of Engineers in the execution of its responsibilities should not be released to the general public, unless the NWS is willing to make the release or agrees to such dissemination. However, release to interested parties of factual information on current storms or river conditions and properly quoted NWS forecasts is permissible. District offices are encouraged to provide assistance to communities and individuals regarding the impact of forecasted floods. Typical advice would be to provide approximate water surface elevations at locations upstream and downstream of the NWS forecasting stream gages. Announcement of anticipated changes in reservoir release rates as far in advance as possible to the general public is the responsibility of Corps of Engineers water control managers for projects under their jurisdiction.
(9) Water control plans will be developed in concert with all basin interests which are or could be impacted by or have an influence on project regulation. Close coordination will be maintained with all appropriate international, Federal, State, regional and local agencies in the development and execution of water control plans. Effective public information programs will be developed and maintained so as to inform and educate the public regarding Corps of Engineers water control management activities.
(10) Fiscal year budget requests for water control management activities will be prepared and submitted to the Office of the Chief of Engineers in accordance with requirements established in Engineer Circular on Annual Budget Requests for Civil Works Activities. The total annual costs of all activities and facilities that support the water control functions, (excluding physical operation of projects, but including flood control and navigation regulation of projects subject to 33 CFR 208.11) are to be reported. Information on the Water Control Data Systems and associated Communications Category of the Plant Replacement and Improvement Program will be submitted with the annual budget. Reporting will be in accordance with the annual Engineer Circular on Civil Works Operations and Maintenance, General Program.
(g) Responsibilities: US Army Corps of Engineers projects—(1) Preparation of water control plans and manuals. Normally, district commanders are primarily responsible for background studies and for developing plans and manuals required for reservoirs, locks and dams, reregulation and major control structures and interrelated systems in their respective district areas. Policies and general guidelines are prescribed by OCE engineer regulations while specific requirements to implement OCE guidance are established by the division commanders concerned. Master Water Control Manuals for river basins that include more than one district are usually prepared by or under direct supervision of division representatives. Division commanders are responsible for providing such management and technical assistance as may be required to assure that plans and manuals are prepared on a timely and adequate basis to meet water control requirements in the division area, and for pertinent coordination among districts, divisions, and other appropriate entities.
(2) Public involvement and information—(i) Public meeting and public involvement. The Corps of Engineers will sponsor public involvement activities, as appropriate, to appraise the general public of the water control plan. In developing or modifying water control manuals, the following criteria is applicable.
(A) Conditions that require public involvement and public meetings include: Development of a new water control manual that includes a water control plan; or revision or update of a water control manual that changes the water control plan.
(B) Revisions to water control manuals that are administratively or informational in nature and that do not change the water control plan do not require public meetings.
(C) For those conditions described in paragraph (g)(2)(i)(A) of this section, the Corps will provide information to the public concerning proposed water control management decisions at least 30 days in advance of a public meeting. In so doing, a separate document(s) should be prepared that explains the recommended water control plan or change, and provides technical information explaining the basis for the recommendation. It should include a description of its impacts (both monetary and nonmonetary) for various purposes, and the comparisons with alternative plans or changes and their effects. The plan or manual will be prepared only after the public involvement process associated with its development or change is complete.
(D) For those conditions described in paragraph (g)(2)(i)(A) of this section, the responsible division office will send each proposed water control manual to the Army Corps of Engineers Headquarters, Attn: CECW-EH-W for review and comments prior to approval by the responsible division office.
(ii) Information availability. The water control manual will be made available for examination by the general public upon request at the appropriate office of the Corps of Engineers. Public notice shall be given in the event of occurring or anticipated significant changes in reservoir storage or flow releases. The method of conveying this information shall be commensurate with the urgency of the situation and the lead time available.
(3) Authority for approval of plans and manuals. Division commanders are delegated authority for approval of water control plans and manuals, and associated activities.
(4) OCE role in water control activities. OCE will establish policies and guidelines applicable to all field offices and for such actions as are necessary to assure a reasonable degree of consistency in basic policies and practices in all Division areas. Assistance will be provided to field offices during emergencies and upon special request.
(5) Methods improvement and staff training. Division and district commanders are responsible for conducting appropriate programs for improving technical methods applicable to water control activities in their respective areas. Suitable training programs should be maintained to assure a satisfactory performance capability in water control activities. Appropriate coordination of such programs with similar activities in other areas will be accomplished to avoid duplication of effort, and to foster desirable exchange of ideas and developments. Initiative in re-evaluating methods and guidelines previously established in official documents referred to in paragraph (e) of this section is encouraged where needs are evident. However, proposals for major deviations from basic concepts, policies and general practices reflected in official publications will be submitted to CDR USACE (DAEN-CWE) WASH DC 20314 for concurrence or comment before being adopted for substantial application in actual project regulation at field level.
(h) Directives and technical instruction manuals. (1) Directives issued through OCE Engineer Regulations will be used to foster consistency in policies and basic practices. They will be supplemented as needed by other forms of communication.
(2) Engineering Manuals (EM) and Engineer Technical Letters (ETL) are issued by OCE to serve as general guidelines and technical aids in developing water control plans and manuals for individual projects or systems.
(3) EM 1110-2-3600 discusses principles and concepts involved in developing water control plans. Instructions relating to preparation of “Water Control Manuals for specific projects” are included. EM 1110-2-3600 should be used as a general guide to water control activities. The instructions are sufficiently flexible to permit adaptation to specific regions. Supplemental information regarding technical methods is provided in numerous documents distributed to field offices as “hydrologic references.”
(4) Special assistance in technical studies is available from the Hydrologic Engineering Center, Corps of Engineers, 609 Second Street, Davis, California 95616 and DAEN-CWE-HW.
(i) Water control manuals for US Army Corps of Engineers projects. (1) As used herein, the term “water control manual” refers to manuals that relate primarily to the functional regulation of an individual project or system of projects. Although such manuals normally include background information concerning physical features of projects, they do not prescribe rules or methods for physical maintenance or care of facilities, which are covered in other documents. (References 15 and 23, appendix A.)
(2) Water control manuals prepared in substantially the detail and format specified in instructions referred to in paragraph 8 are required for all reservoirs under the supervision of the Corps of Engineers, regardless of the purpose or size of the project. Water Control manuals are also required for lock and dam, reregulation and major control structure projects that are physically regulated by the Corps of Engineers. Where there are several projects in a drainage basin with interrelated purposes, a “Master Manual” shall be prepared. The effects of non-Corps projects will be considered in appropriate detail, including an indication of provisions for interagency coordination.
(3) “Preliminary water control manuals,” for projects regulated by the Corps of Engineers should contain regulation schedules in sufficient detail to establish the basic plan of initial project regulation.
(4) As a general rule, preliminary manuals should be superseded by more detailed interim or “final” manuals within approximately one year after the project is placed in operation.
(5) Each water control manual will contain a section on special regulations to be conducted during emergency situations, including droughts. Preplanned operations and coordination are essential to effective relief or assistance.
(6) One copy of all water control manuals and subsequent revisions shall be forwarded to DAEN-CWE-HW for file purposes as soon as practicable after completion, preferably within 30 days from date of approval at the division level.
(j) Policies and requirements for preparing regulations for non-Corps projects. (1) Division and district commanders will develop water control plans as required by section 7 of the 1944 Flood Control Act, the Federal Power Act and section 9 of Pub. L. 436-83 for all projects located within their areas, in conformance with ER 1110-2-241, 33 CFR part 208. That regulation prescribes the policy and general procedures for regulating reservoir projects capable of regulation for flood control or navigation, except projects owned and operated by the Corps of Engineers; the International Boundary and Water Commission, United States and Mexico; those under the jurisdiction of the International Joint Commission, United States and Canada, and the Columbia River Treaty. ER 1110-2-241, 33 CFR part 208 permits the promulgation of specific regulations for a project in compliance with the authorizing acts, when agreement on acceptable regulations cannot be reached between the Corps Engineers and the owners. Appendix B provides a summary of the Corps of Engineers responsibilities for prescribing regulations for non-Corps reservoir projects.
(2) Water control plans will be developed and processed as soon as possible for applicable projects already completed and being operated by other entities, including projects built by the Corps of Engineers and turned over to others for operation.
(3) In so far as practicable, water control plans for non-Corps projects should be developed in cooperation with owning/operating agencies involved during project planning stages. Thus, tentative agreements on contents, including pertinent regulation schedules and diagrams, can be accomplished prior to completion of the project.
(4) The magnitude and nature of storage allocations for flood control or navigation purposes in non-Corps projects are governed basically by conditions of project authorizations or other legislative provisions and may include any or all of the following types of storage assignments:
(i) Year-round allocations: Storage remains the same all year.
(ii) Seasonal allocations: Storage varies on a fixed seasonal basis.
(iii) Variable allocations of flood control from year to year, depending on hydrologic parameters, such as snow cover.
(5) Water control plans should be developed to attain maximum flood control or navigation benefits, consistent with other project requirements, from the storage space provided for these purposes. When reservoir storage capacity of the category referred to in paragraph (j)(4)(iii) is utilized for flood control or navigation, jointly with other objectives, the hydrologic parameters and related rules developed under provisions of ER 1110-2-241, 33 CFR part 208 should conform as equitably as possible with the multiple-purpose objectives established in project authorizations and other pertinent legislation.
(6) Storage allocations made for flood control or navigation purposes in non-Corps projects are not subject to modifications by the Corps of Engineers as a prerequisite for prescribing 33 CFR 208.11 regulations. However, regulations developed for use of such storage should be predicated on a mutual understanding between representatives of the Corps and the operating agency concerning the conditions of the allocations in order to assure reasonable achievement of basic objectives intended. In the event field representatives of the Corps of Engineers, and the operating agency are unable to reach necessary agreements after all reasonable possibilities have been explored, appropriate background explanations and recommendations should be submitted to DAEN-CWE-HW for consideration.
(7) The Chief of Engineers is responsible for prescribing regulations for use of flood control or navigation storage and/or project operation under the provisions of the referenced legislative acts. Accordingly, any regulations established should designate the division/district commander who is responsible to the Chief of Engineers as the representative to issue any special instructions required under the regulation. However, to the extent practicable, project regulations should be written to permit operation of the project by the owner without interpretations of the regulations by the designated representative of the Commander during operating periods.
(8) Responsibility for compliance with 33 CFR 208.11 regulations rests with the operating agency. The division or district commander of the area in which the project is located will be kept informed regarding project operations to verify reasonable conformance with the regulations. The Chief of Engineers or his designated representative may authorize or direct deviation from the established water control plan when conditions warrant such deviation. In the event unapproved deviations from the prescribed regulations seem evident, the division or district commander concerned will bring the matter to the attention of the operating agency by appropriate means.
If corrective actions are not taken promptly, the operating agency should be notified of the apparent deviation in writing as a matter of record. Should an impasse arise, in that the project owner or the designated operating entity persists in noncompliance with regulations prescribed by the Corps of Engineers, the Office of Chief Counsel should be advised through normal channels and requested to take necessary measures to assure compliance.
(9) Regulations should contain information regarding the required exchange of basic data between the representative of the operating agency and the U.S. Army Corps of Engineers, that are pertinent to regulation and coordination of interrelated projects in the region.
(10) All 33 CFR 208.11 regulations shall contain provisions authorizing the operating agency to temporarily deviate from the regulations in the event that it is necessary for emergency reasons to protect the safety of the dam, to avoid health hazards, and to alleviate other critical situations.
(k) Developing and processing regulations for non-Corps projects. Guidelines concerning technical studies and development of regulations are contained in ER 1110-2-241, 33 CFR part 208 and EM 1110-2-3600. Appendix C of this regulation summarizes steps normally followed in developing and processing regulations for non-Corps projects.
(l) Water control during project construction stage. Water control plans discussed in preceding paragraphs are intended primarily for application after the dam, spillway and outlet structures; major relocations; land acquisitions, administrative arrangements and other project requirements have reached stages that permit relatively normal project regulation. With respect to non-Corps projects, regulations normally become applicable when water control agreements have been signed by the designated signatories, subject to special provisions in specific cases. In some instances, implementation of regulations has been delayed by legal provisions, contract limitations, or other considerations. These delays can result in loss of potential project benefits and possible hazards. Accordingly, it is essential that appropriate water control and contingency plans be established for use from the date any storage may accumulate behind a partially completed dam until the project is formally accepted for normal operations. Division commanders shall make certain that construction-stage regulation plans are established and maintained in a timely and adequate manner for projects under the supervision of the Corps of Engineers. In addition, the problems referred to should be discussed with authorities who are responsible for non-Corps projects, with the objective of assuring that such projects operate as safely and effectively as possible during the critical construction stage and any period that may elapse before regular operating arrangements have been established. These special regulation plans should include consideration for protection of construction operations; safety of downstream interests that might be jeopardized by failure of partially completed embankments; requirements for minimizing adverse effects on partially completed relocations or incomplete land acquisition; and the need for obtaining benefits from project storage that can be safely achieved during the construction and early operation period.
(m) Advisories to OCE regarding water control activities—(1) General. Division commanders will keep the Chief of Engineers currently informed of any unusual problems or activities associated with water control that impact on his responsibilities.
(2) Annual division water control management report (RCS DAEN-CWE-16(R1)). Division commanders will submit an annual report on water control management activities within their division. The annual report will be submitted to (DAEN-CWE-HW) by 1 February each year and cover significant activities of the previous water year and a description of activities to be accomplished for the current year. Funding information for water control activities will be provided in the letter of transmittal for in-house use only. The primary objective of this summary is to keep the Chief of Engineers informed regarding overall water management activities Corps-wide, thus providing a basis to carry out OCE responsibilities set forth in paragraph (g)(4) of this section.
(3) Status of water control manuals. A brief discussion shall be prepared annually by each division commander, as a separate section of the annual report on water control management activities discussed in paragraph (m)(2) of this section listing all projects currently in operation in his area, or expected to begin operation within one-year, with a designation of the status of water control manuals. The report should also list projects for which the Corps of Engineers is responsible for prescribing regulations, as defined in ER 1110-2-241, 33 CFR part 208.
(4) Monthly water control charts (RCS DAEN-CWE-6 (R1)). A monthly record of reservoirs/lakes operated by the Corps of Engineers and other agencies, in accordance with 33 CFR 208.11, will be promptly prepared and maintained by district/division commanders in a form readily available for transmittal to the Chief of Engineers, or others, upon request. Record data may be prepared in either graphical form as shown in EM 1110-2-3600, or tabular form as shown in the sample tabulation in appendix D.
(5) Annual division water quality reports (RCS DAEN-CWE-15). By Executive Order 12088, the President ordered the head of each Executive Agency to be responsible for ensuring that all necessary actions are taken for prevention, control, and abatement of environmental pollution with respect to Federal facilities and activities under control of the agency. General guidance is provided in references 24 and 25, appendix A, for carrying out this agency's responsibility. Annual division water quality reports are required by reference 24, appendix A. The report is submitted in two parts. The first part addresses the division Water quality management plan while the second part presents specific project information. A major objective of this report is to summarize information pertinent to water quality aspects of overall water management responsibilities. The annual division water quality report may be submitted along with the annual report on water control management activities discussed in paragraph 13b above.
(6) Master plans for water control data systems (RCS DAEN-CWE-21). (i) A water control data system is all of the equipment within a division which is used to acquire, process, display and distribute information for real-time project regulation and associated interagency coordination. A subsystem is all equipment as defined previously within a district. A network is all equipment as defined previously which is used to regulate a single project or a group of projects which must be regulated interdependently.
(ii) Master plans for water control data systems and significant revisions thereto will be prepared by division water control managers and submitted to DAEN-CWE-HW by 1 February each year for review and approval of engineering aspects. Engineering approval does not constitute funding approval. After engineering approval is obtained, equipment in the master plan is eligible for consideration in the funding processes described in ER 1125-2-301 and engineering circulars on the annual budget request for civil works activities. Master plans will be maintained current and will:
(A) Outline the system performance requirements, including those resulting from any expected expansions of Corps missions.
(B) Describe the extent to which existing facilities fulfill performance requirements.
(C) Describe alternative approaches which will upgrade the system to meet the requirements not fulfilled by existing facilities, or are more cost effective than the existing system.
(D) Justify and recommend a system considering timeliness, reliability, economics and other factors deemed important.
(E) Delineate system scope, implementation schedules, proposed annual capital expenditures by district, total costs, and sources of funding.
(iii) Modified master plans should be submitted to DAEN-CWE-HW by 1 February, whenever revisions are required, to include equipment not previously approved or changes in scope or approach. Submittal by the February date will allow adequate time for OCE review and approval prior to annual budget submittals.
(iv) Division commanders are delegated authority to approve detailed plans for subsystems and networks of approved master plans. Plans approved by the division commander should meet the following conditions:
(A) The plan conforms to an approved master plan.
(B) The equipment is capable of functioning independently.
(C) An evaluation of alternatives has been completed considering reliability, cost and other important factors.
(D) The plan is economically justified, except in special cases where legal requirements dictate performance standards which cannot be economically justified.
(v) Copies of plans approved by the division commander shall be forwarded to appropriate elements in OCE in support of funding requests and to obtain approval of Automatic Data Processing Equipment (ADPE), when applicable.
(vi) Water control data systems may be funded from Plant Revolving Fund; O&M General; Flood Control, MR&T, and Construction, General. Funding for water control equipment that serves two or more projects will be from Plant Revolving Fund in accordance with ER 1125-2-301. District and division water control managers will coordinate plant revolving fund requests with their respective Plant Replacement and Improvement Program (PRIP) representatives following guidance provided in ER 1125-2-301. Budget funding requests under the proper appropriation title should be submitted only if the equipment is identified in an approved master plan.
(vii) Justification for the Automatic Data Processing Equipment (ADPE) aspects of water control data systems must conform to AR 18-1, Appendix I or J as required. The “Funding for ADPE” paragraph in Appendixes I and J must cite the source of funds and reference relevant information in the approved master plan and detailed plan.
(viii) Division water control managers will submit annual letter summaries of the status of their respective water control systems and five-year plan for improvements. These summaries will be submitted to DAEN-CWE by 1 June for coordination with DAEN-CWO, CWB and DSZ-A, prior to the annual budget request. Summaries should not be used to obtain approval of significant changes in master plans. Sources of funding for all items for each district and for the division should be delineated so that total system expenditures and funding requests are identified. Changes in the master plan submitted 1 February should be documented in this letter summary if the changes were approved.
(7) Summary of runoff potentials in current season (RCS DAEN-CWO-2). (i) The Chief of Engineers and staff require information to respond to inquiries from members of Congress and others regarding runoff potentials. Therefore, the division commander will submit a snowmelt runoff and flood potential letter report covering the snow accumulation and runoff period, beginning generally in February and continuing monthly, until the potential no longer exist. Dispatch of supplemental reports will be determined by the urgencies of situations as they occur. The reports will be forwarded as soon as hydrologic data are available, but not later than the 10th of the month. For further information on reporting refer to ER 500-1-1, 33 CFR part 203.
(ii) During major drought situations or low-flow conditions, narrative summaries of the situation should be furnished to alert the Chief of Engineers regarding the possibility of serious runoff deficiencies that are likely to call for actions associated with Corps of Engineers reservoirs.
(iii) The reports referred to in paragraphs (m)(7) (i) and (ii) of this section will include general summaries regarding the status of reservoir storage, existing and forecasted at the time of the reports.
(8) Reports on project operations during flood emergencies. Information on project regulations to be included in reports submitted to the Chief of Engineers during flood emergencies in accordance with ER 500-1-1 include rate of inflow and outflow in CFS, reservoir levels, predicted maximum level and anticipated date, and percent of flood control storage utilized to date. Maximum use should be made of computerized communication facilities in reporting project status to DAEN-CWO-E/CWE-HW in accordance with the requirements of ER 500-1-1, 33 CFR part 203.
(9) Post-flood summaries of project regulation. Project regulation effects including evaluation of the stage reductions at key stations and estimates of damages prevented by projects will be included in the post flood reports required by ER 500-1-1, 33 CFR part 203.
(n) Water Control Management Boards. (1) The Columbia River Treaty Permanent Engineering Board was formed in accordance with the Columbia River Treaty with Canada. This board, composed of U.S. and Canadian members, oversees the implementation of the Treaty as carried out by the U.S. and Canadian Entities.
(2) The Mississippi River Water Control Management Board was established by ER 15-2-13. It consists of the Division Commanders from LMVD, MRD, NCD, ORD, and SWD with the Director of Civil Works serving as chairman. The purposes of the Board are:
(i) To provide oversight and guidance during the development of basin-wide management plans for Mississippi River Basin projects for which the US Army Corps of Engineers has operation/regulation responsibilities.
(ii) To serve as a forum for resolution of water control problems among US Army Corps of Engineers Divisions within the Mississippi River Basin when agreement is otherwise unobtainable.
(o) List of projects. Projects owned and operated by the Corps of Engineers subject to this regulation are listed with pertinent data in Appendix E. This list will be updated periodically to include Corps projects completed in the future. Federal legislation, Federal regulations and local agreements have given the Corps of Engineers wide responsibilities for operating projects which it does not own. Non-Corps projects subject to this regulation are included in Appendix A of ER 1110-2-241.
Appendix A to § 222.5—References 1. The Federal Power Act, Pub. L. 436-83, approved 10 June 1920, as amended (41 Stat. 1063; 16 U.S.C. 791(a)) 2. Section 3 of the Flood Control Act approved 22 June 1936, as amended (49 Stat. 1571; 33 U.S.C. 701(c)) 3. Section 9(b) of Reclamation Project Act of 1939, approved 4 August 1939 (53 Stat. 1187; 43 U.S.C. 485) 4. Section 7 of the Flood Control Act approved 22 December 1944 (58 Stat. 890; 33 U.S.C. 709) 5. Section 5 of Small Reclamation Projects Act of 6 August 1956, as amended (70 Stat. 1046; 43 U.S.C. 422(e)) 6. Section 9 of Pub. L. 436-83d Congress (68 Stat. 303) 7. The Fish and Wildlife Coordination Act of 1958, Pub. L. 85-624 8. The Federal Water Project Recreation Act Uniform Policies, Pub. L. 89-72 9. The National Environmental Policy Act of 1969, Pub. L. 91-190 10. The Clean Water Act of 1977, Pub. L. 95-217 11. Executive Order 12088, Federal Compliance with Pollution Control Standards, 13 October 1978 12. 33 CFR 208.10, Local flood protection works; maintenance and operation of structures and facilities (9 FR 9999; 9 FR 10203) 13. 33 CFR 208.11, Regulations for use of Storage Allocated for Flood Control or Navigation and/or Project Operation at Reservoirs subject to Prescription of Rules and Regulations by the Secretary of the Army in the Interest of Flood Control and Navigation (43 FR 47184) 14. AR 18-1 15. ER 11-2-101 16. ER 15-2-13 17. ER 500-1-1, 33 CFR part 203 18. ER 1110-2-241, 33 CFR part 208 19. ER 1110-2-1400 20. ER 1110-2-1402 21. ER 1110-2-1941 22. ER 1125-2-301 23. ER 1130-2-303 24. ER 1130-2-334 25. ER 1130-2-415 26. ER 1130-2-417 27. ER 1130-2-419 28. EM 1110-2-3600
Appendix B to § 222.5—Summary of Corps of Engineers Responsibilities for Prescribing Regulations for Non-Corps Reservoir Projects Summary
1. (a) “Regulations for Use of Storage Allocated for Flood Control or Navigation and/or Project Operation at Reservoirs subject to Prescription of Rules and Regulations by the Secretary of the Army in the Interest of Flood Control and Navigation” (33 CFR 208.11) prescribe the responsibilities and general procedures for regulating reservoir projects capable of regulation for flood control or navigation and the use of storage allocated for such purposes and provided on the basis of flood control and navigation, except projects owned and operated by the Corps of Engineers; the International Boundary and Water Commission, United States and Mexico; and those under the jurisdiction of the International Joint Commission, United States and Canada, and the Columbia River Treaty.
(b) Pertinent information on projects for which regulations are prescribed under Section 7 of the 1944 Flood Control Act, (Pub. L. 78-58 Stat. 890 (33 U.S.C. 709)) the Federal Power Act (41 Stat. 1063 (16 U.S.C. 791(A))) and Section 9 of Pub. L. 436-83d Congress (68 Stat. 303) is published in the Federal Register in accordance with 33 CFR 208.11.
Publication in the Federal Register establishes the fact and the date of a project's regulation plan promulgation.
2. Section 7 of Act of Congress approved 22 December 1944 (58 Stat. 890; 33 U.S.C. 709), reads as follows:
“Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or in part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be in accordance with such regulations: Provided, That this section shall not apply to the Tennessee Valley Authority, except that in case of danger from floods on the Lower Ohio and Mississippi Rivers the Tennessee Valley Authority is directed to regulate the release of water from the Tennessee River into the Ohio River in accordance with such instructions as may be issued by the War Department.”
3. Section 9(b) of the Reclamation Project Act of 1939, approved 4 August 1939 (53 Stat. 1189, 43 U.S.C. 485), provides that the Secretary of the Interior may allocate to flood control or navigation as part of the cost of new projects or supplemental works; and that in connection therewith he shall consult with the Chief of Engineers and may perform any necessary investigations under a cooperative agreement with the Secretary of the Army. These projects are subject to 33 CFR 208.11 regulations.
4. Several dams have been constructed by State agencies under provisions of legislative acts wherein the Secretary of the Army is directed to prescribe rules and regulations for project operation in the interest of flood control and navigation. These projects are subject to 33 CFR 208.11 regulations.
5. There are few dams constructed under Emergency Conservation work authority or similar programs, where the Corps of Engineers has performed major repairs or rehabilitation, that are operated and maintained by local agencies which are subject to 33 CFR 208.11 regulations.
6. The Federal Power Act, approved 10 June 1920, as amended (41 Stat. 1063, 16 U.S.C. 791 (A)), established the Federal Power Commission, now Federal Energy Regulatory Commission (FERC), with authority to issue licenses for constructing, operating, and maintaining dams or other project works for the development of navigation, for utilization of water power and for other beneficial public uses in any streams over which Congress has jurisdiction. The Chief of Engineers is called upon for advice and assistance as needed in formulating reservoir regulation requirements somewhat as follows:
a. In response to requests from the FERC, opinions and technical appraisals are furnished by the Corps of Engineers for consideration prior to issuance of licenses by the FERC. Such assistance may be limited to general presentations, or may include relatively detailed proposals for water control plans, depending upon the nature and scope of projects under consideration. The information furnished is subject to such consideration and use as the Chairman, FERC, deems appropriate. This may result in inclusion of simple provisions in licenses without elaboration, or relatively detailed requirements for reservoir regulation schedules and plans.
b. Some special acts of Congress provide for construction of dams and reservoirs by non-Federal agencies or private firms under licenses issued by the FERC, subject to stipulation that the operation and maintenance of the dams shall be subject to reasonable rules and regulations of the Secretary of the Army in the interest of flood control and navigation. Ordinarily no Federal funds are involved, thus Section 7 of the 1944 Flood Control Act does not apply. However, if issuance of regulations by the Secretary of the Army is required by the authority under which flood control or navigation provisions are included as functions of the specific project or otherwise specified in the FERC license, regulation plans will be prescribed in accordance with 33 CFR 208.11 regulations.
7. Projects constructed by the Corps of Engineers for local flood protection purposes are subject to conditions of local cooperation as provided in Section 3 of the Flood Control Act approved 22 June 1936, as amended. One of those conditions is that a responsible local agency will maintain and operate all works after completion in accordance with regulations prescribed by the Secretary of the Army. Most such projects consist mainly of levees and flood walls with appurtenant drainage structures. Regulations for operation and maintenance of these projects has been prescribed by the Secretary of the Army in 33 CFR 208.10. When a reservoir is included in such a project, it may be appropriate to apply 33 CFR 208.10 in establishing regulations for operation, without requiring their publication in the Federal Register. For example, if the reservoir controls a small drainage area, has an uncontrolled flood control outlet with automatic operation or contains less than 12,500 acre-feet of flood control or navigation storage, 33 CFR 208.10 may be suitable. However, 33 CFR 208.11 regulations normally would be applicable in prescribing flood control regulations for the individual reservoir, if the project has a gated flood control outlet by which the local agency can regulate floods.
8. Regulation plans for projects owned by the Corps of Engineers are not prescribed in accordance with 33 CFR 208.11. However, regulation plans for projects constructed by the Corps of Engineers and turned over to other agencies or local interests for operation may be prescribed in accordance with 33 CFR 208.11.
9. The Small Reclamation Projects Act of 6 August 1956 provides that the Secretary of the Interior may make loans or grants to local agencies for the construction of reclamation projects. Section 5 of the Act provides in part that the contract covering any such grant shall set forth that operation be in accordance with regulations prescribed by the head of the Federal department or agency primarily concerned. Normally, 33 CFR 208.11 is not applicable to these projects.
Appendix C to § 222.5—Procedures for Developing and Processing Regulations for Non-Corps Projects in Conformance with 33 CFR 208.11
1. Sequence of actions. a. Discussions leading to a clarification of conditions governing allocations of storage capacity to flood control or navigation purposes and project regulation are initiated by District/Division Engineers through contacts with owners and/or operating agencies concerned at regional level.
b. Background information on the project and conditions requiring flood control or navigation services, and other relevant factors, are assembled by the District Engineer and incorporated in a “Preliminary Information Report”. The Preliminary Information Report will be submitted to the Division Engineer for review and approval. Normally, the agency having jurisdiction over the particular project is expected to furnish information on project features, the basis for storage allocations and any other available data pertinent to the studies. The Corps of Engineers supplements this information as required.
c. Studies required to develop reservoir regulation schedules and plans usually will be conducted by Corps of Engineers personnel at District level, except where the project regulation affects flows in more than one district, in which case the studies will be conducted by or under supervision of Division personnel. Assistance as may be available from the project operating agency or others concerned will be solicited.
d. When necessary agreements are reached at district level, and regulations developed in accordance with 33 CFR 208.11 and EM 1110-2-3600, they will be submitted to the Division Commander for review and approval, with information copies for DAEN-CWE-HW. Usually the regulations include diagrams of operating parameters.
e. For projects owned by the Bureau of Reclamation, the respective Regional Directors are designated as duly authorized representatives of the Commissioner of Reclamation. By letter of 20 October 1976, the Commissioner delegated responsibilities to the Regional Directors as follows: “Regarding the designated authorization of representatives of the Commissioner of Reclamation in matters relating to the development and processing of Section 7 flood control regulations, we are designating each Regional Director as our duly authorized representative to sign all letters of understanding, water control agreements, water control diagrams, water control release schedules and other documents which may become part of the prescribed regulations. The Regional Director also will be responsible for obtaining the signature of the designated operating agency on these documents where such is required. Regarding internal coordination within the Bureau of Reclamation, the Regional Directors will obtain the review and approval of this office and at appropriate offices with our Engineering and Research Center, Denver, Colorado, prior to signing water control documents.”
f. In accordance with the delegation cited in paragraph e, 33 CFR 208.11 regulations pertaining to Bureau of Reclamation projects will be processed as follows:
(1) After regulation documents submitted by District Commanders are reviewed and approved by the Division Commander they are transmitted to the respective Regional Director of the Bureau of Reclamation for concurrence of comment, with a request that tracings of regulation diagrams be signed and returned to the Division Commander.
(2) If any questions arise at this stage appropriate actions are taken to resolve differences. Otherwise, the duplicate tracings of the regulation diagram are signed by the Division Commander and transmitted to the office of the project owner for filing.
(3) After full agreement has been reached in steps (1) and (2), the text of proposed regulations is prepared in final form. Copies of any diagrams involved are included for information only.
(4) A letter announcing completion of action on processing the regulations, with pertinent project data as specified in paragraph 208.11(d)(11) of 33 CFR 208.11, and one copy of the signed tracings of diagrams are forwarded to HQDA (DAEN-CWE-HW) WASH DC 20314 for promulgation and filing. The office of the Chief of Engineers will forward the pertinent project data to the Liaison Officer with the Federal Register, requesting publication in the Federal Register.
g. Regulations developed in accordance with 33 CFR 208.11 and applicable to projects that are not under supervision of the Bureau of Reclamation are processed in substantially the manner described above. All coordination required between the Corps of Engineers and the operating agency will be accomplished at field level.
h. Upon completion of actions listed above, Division Commanders are responsible for informing the operating agencies at field level that regulations have been promulgated.
2. Signature blocks: Some 33 CFR 208.11 regulations contain diagrams of parameter curves that cannot be published in the Federal Register, but are made a part thereof by appropriate reference. Each diagram bears a title block with spaces for the signature of authenticating officials of the Corps of Engineers and the owner/operating agency of the project involved.
3. Designation of Corps of Engineers Representatives. Division Commanders are designated representatives of the Chief of Engineers in matters relating to development and processing of 33 CFR 208.11 regulations for eventual promulgation through publication of selected data specified in paragraph (d)(11) § 208.11. Division Commanders are designated as the Corps of Engineers signee on all letters of understanding, water control agreements and other documents which may become part of prescribed regulations for projects located in their respective geographic areas, and which are subject to the provisions of 33 CFR 208.11.
Appendix D to § 222.5—Sample Tabulation
Bardwell Lake, Monthly Lake Report, May 1975
Day | Elevations 0800: 2,400 feet-MSL | Storage 2400 A-F | Evap DSF | Pump DSF | Release DSF | Inflow adj. DSF | Rain, inch
1 | 421.30 421.31 | 55979 | 28 | 2.0 | 0 | 84 | 0.00
2 | 421.32 421.37 | 56196 | 5 | 2.0 | 0 | 117 | .00
3 | 421.43 421.44 | 56449 | 23 | 1.9 | 0 | 152 | .14
4 | 421.45 421.47 | 56558 | 1 | 1.8 | 0 | 58 | .00
5 | 421.49 421.34 | 56088 | 1 | 2.0 | 324 | 50 | .00
6 | 421.20 421.01 | 54902 | 14 | 1.9 | 632 | 50 | .00
7 | 420.88 420.89 | 54473 | 4 | 2.0 | 269 | 59 | .09
8 | 420.89 420.91 | 54544 | 5 | 2.3 | 0 | 44 | .00
9 | 420.90 420.89 | 54473 | 11 | 1.5 | 0 | 38 | .00
10 | 420.90 420.90 | 54509 | 28 | 3.0 | 0 | 27 | .00
11 | 420.91 421.35 | 56124 | 26 | 1.8 | 0 | 824 | .00
12 | 421.54 421.65 | 57213 | 31 | 2.1 | 0 | 582 | 1.61
13 | 421.70 421.75 | 57578 | 29 | 2.2 | 0 | 216 | .00
14 | 421.78 421.76 | 57614 | 34 | 1.9 | 249 | 303 | .03
15 | 421.69 421.52 | 56739 | 22 | 1.9 | 643 | 225 | .57
16 | 421.39 421.28 | 55871 | 39 | 2.1 | 535 | 138 | .00
17 | 421.19 421.09 | 55188 | 10 | 2.2 | 393 | 119 | .00
18 | 421.03 421.05 | 55045 | 46 | 2.0 | 143 | 60 | .00
19 | 421.04 421.07 | 55116 | 17 | 2.3 | 0 | 55 | .00
20 | 421.06 421.30 | 55943 | 21 | 2.1 | 0 | 440 | .21
21 | 421.39 421.47 | 56558 | 20 | 2.1 | 0 | 332 | .97
22 | 421.50 421.39 | 56268 | 42 | 2.1 | 247 | 145 | .00
23 | 421.37 424.91 | 69726 | 31 | 2.0 | 328 | 7146 | .22
24 | 425.61 426.15 | 74825 | 22 | 2.0 | 0 | 2595 | 2.38
25 | 426.15 426.55 | 76523 | 18 | 2.3 | 0 | 876 | .11
26 | 426.72 426.80 | 77598 | 42 | 2.1 | 0 | 586 | .00
27 | 426.95 427.00 | 78465 | 23 | 2.0 | 0 | 462 | .00
28 | 427.14 427.15 | 79116 | 31 | 2.1 | 0 | 361 | .19
29 | 427.31 427.70 | 81528 | 61 | 1.9 | 0 | 1279 | .20
30 | 427.94 428.05 | 83082 | 11 | 2.0 | 0 | 796 | 1.02
31 | 428.20 428.22 | 83837 | 7 | 2.1 | 0 | 389 | .00
Monthly total:
(DSF) 700 64 3763 18626 7.74
(A-F) | 27966 | 1389 | 126 | 7464 | 36945
Appendix E to § 222.5—List of Projects
Project name 1 | State/county | Stream 1 | Project purpose 2 | Storage 1,000 AF | Elev limits feet M.S.L. | Area in acres | Auth legis 3
Upper | Lower | Upper | Lower
Lower Mississippi Valley Division
Alligator—Catfish FG | MS Issaquena | Little Sunflower | F | 0.0 | 0.0 | 0.0 | 0 | 0 | FCA Jun 36.
Arkabutla Lk | MS Desoto | Coldwater | F | 525.0 | 238.3 | 209.3 | 33,400 | 5,100 | FCA Jun 36.
Ascalmore—Tippo FG & CS | MS Tallahatchie | Ascalmore | F | 0.0 | 136.0 | 118.0 | 0 | 0 | FCA Jun 36.
Bienvenue FG | LA St Bernard | Bayou Bienvenue | F | 0.0 | 2.0 | 2.0 | 0 | 0 | PL 298-89
Big Lk Ditch #81 CS | AR Mississippi | Ditch 81 Extension. | C | 0.0 | 0.0 | 230.0 | 0 | 0 | FCA Oct 65.
Big Lk Div CS | AR Mississippi | Little R | C | 0.0 | 0.0 | 230.0 | 0 | 0 | FCA Oct 65.
Big Lk North End CS | AR Mississippi | Little R | C | 0.0 | 0.0 | 230.0 | 0 | 0 | FCA Oct 65.
Big Lk South end CS | AR Mississippi | Ditch 28 | C | 0.0 | 0.0 | 230.0 | 0 | 0 | FCA Oct 65.
Birds Point—New Madrid Div Floodway | MO New Madrid | Mississippi | F | 0.0 | 330.5 | 328.5 | 131,000 | 71,000 | FCA May 28.
Bodcau Lk | LA Bossier | Bayou Bodcau | F | 35.3 | 199.5 | 157.0 | 21,000 | 110 | PL 74-839.
Bonnet Carre Div Spillway | LA St Charles | Mississippi R | F | 0.0 | 24.0 | 20.0 | 0 | 0 | FCA May 28.
Bowman Lock | LA Vermilion | GIWW | I | 0.0 | 1.2 | 1.2 | 0 | 0 | PL 79-14.
Caddo Lk | LA Caddo | Cypress Bayou | N | 128.6 | 182.7 | 168.5 | 59,000 | 26,800 | FCA Oct 65.
Cairo 10th & 20th St PS | IL Pulaski | Ohio | F | 0.0 | 310.5 | 299.0 | 0 | 0 | PL 90-483.
Calcasieu SW Barrier & Lock | LA Calcasieu | Calcasieu R | I | 0.0 | 1.2 | 1.2 | 0 | 0 | RHA Oct 62. PL 79-525.
Calion L&D | AR Union | Ouachita | N | 0.0 | 77.0 | 77.0 | 12,200 | 12,200 | RHA 1950.
Calument FG East & West | LA St Mary | Wax Lake Outlet Bayou Teche | FN | 0.0 | 3.0 | 3.0 | 0 | 0 | FCA Jun 36.
Cannon Re-reg | MO Ralls | Salt R | PCA | 5.8 | 528.0 | 521.0 | 1,020 | 460 | HD 507.
Carlyle Lk | IL Clinton | Kaskaskia R | F | 699.0 | 462.5 | 445.0 | 50,440 | 24,580 | SD 44.
NMCAR | 233.0 | 445.0 | 429.5 | 0 | 7,100
Catahoula Lk CS | LA LaSalle | Catahoula Div | CR | 118.0 | 34.0 | 27.0 | 25,000 | 94 | RHA 1960.
Catfish Point CS | LA Cameron | Mermentau R | FN | 0.0 | 1.2 | 1.2 | 0 | 0 | FCA Aug 41, RHA Jul 64.
Charenton FG | LA St Mary | Grand Lk | FN | 0.0 | 0.0 | 0.0 | 0 | 0 | RHA Jul 46, FCA May 28.
Cocodrie FG FG | LA Concorida | Bayou Cocodrie | F | 0.0 | 46.0 | 13.0 | 0 | 0 | FCA Aug 41.
Collins Cr | MS Warren | Collins Cr | F | 0.0 | 84.0 | 67.0 | 0 | 0 | FCA 1941.
Columbia L&D | LA Caldwell | Ouachita | N | 0.0 | 52.0 | 52.0 | 7,070 | 7,070 | RHA 1950.
Connerly CS | AR Chicot | Connerly Bayou | FCR | 0.0 | 116.0 | 106.0 | 0 | 0 | FCA Aug 68.
Courtableau Drainage CS | LA St Landry | Bayou Courtableau | F | 0.0 | 18.0 | 16.0 | 0 | 0 | FCA May 28, PL 391-70.
Darbonne CS | LA St. Landry | Bayou Darbonne | FI | 0.0 | 18.0 | 16.0 | 0 | 0 | FCA May 28, PL 391-70.
DeGray LK | AR Desoto | Caddo | FNPMRA | 881.9 | 423.0 | 345.0 | 23,800 | 6,400 | RHA 1950, WSA 1958.
DeGray Rereg. St | AR Clark | Caddo | NMRA | 3.6 | 221.0 | 209.0 | 430 | 90 | RHA 1950. WSA 1958.
Ditch Bayou Dam | AR Chicot | Ditch Bayou | FCR | 0.0 | 106.0 | 93.0 | 0 | 0 | FCA Aug 68.
Drainage Dist #17 PS | AR Mississippi | Ditch 71 | F | 3.0 | 236.0 | 228.0 | 4,100 | 0 | FCA Aug 68, PL 90-483.
Drinkwater PS | MO Mississippi | Drinkwater Sewer | F | 20.6 | 315.0 | 307.0 | 4,000 | 700 | FCA May 50, PL 516.
Dupre FG | LA St Bernard | Bayou Dupre | F | 0.0 | 2.0 | 2.0 | 0 | 0 | PL 298-89.
East St Louis PS | IL St. Clair | IDD | F | 0.0 | 0.0 | 0.0 | 0 | 0 | FC Act 36.
Empire FG Hurr Prot & Lock | LA Plaque mines | Mississippi R | F | 0.0 | 5.0 | 5.0 | 0 | 0 | PL 874-87.
Enid Lk | MS Yalobusha | Yacona | F | 660.0 | 268.0 | 230.0 | 28,000 | 6,100 | FCA Jun 36.
Felsenthal L&D | AR Union | Ouachita | N | 32.5 | 70.0 | 65.0 | 46,500 | 17,500 | RHA 1950.
Finley Street PS | TN Dyer | Forked Deer | F | 0.5 | 269.0 | 257.0 | 94 | 22 | FCA 1948, PL 85-500.
Freshwater Lock | LA Vermilion | Freshwater Bayou | I | 0.0 | 0.0 | 0.0 | 0 | 0 | PL 86-645.
NI
Graham Burke PS | AR Phillips | White | F | 2,805.0 | 174.8 | 140.0 | 149,000 | 2,500 | FCA May 28, PL 85-500.
Grenada Lk | MS Grenada | Yalobusha Skuna | F | 1,357.4 | 231.0 | 193.0 | 64,600 | 9,800 | FCA Jun 36.
Huxtable PS | AR Lee | St Francis | F | 2,863.0 | 207.2 | 165.0 | 18,500 | 1,400 | FCA May 50.
Jonesville L&D | LA Catahoula | Black | N | 0.0 | 34.0 | 34.0 | 7,120 | 7,120 | RHA 1950.
Kaskaskia L&D | IL Randolph | Kaskaskia R | N | 1.1 | 368.0 | 363.0 | 1,300 | 1,200 | SD 44.
L&D 1 | LA Catahula | Red R | N | 0.0 | 40.0 | 40.0 | 0 | 0 | PL 90-483.
L&D 2 | LA Rapides | Red R | N | 0.0 | 71.2 | 64.0 | 0 | 0 | PL 90-483.
L&D 3 | LA Rapides | Red R | N | 0.0 | 95.0 | 91.5 | 0 | 0 | PL 90-483.
L&D 4 | LA Natchitoches | Red R | N | 0.0 | 120.0 | 119.6 | 0 | 0 | PL 90-483.
L&D 5 | LA Red R | Red R | N | 0.0 | 145.0 | 140.2 | 0 | 0 | PL 90-483.
L&D 24 | MO Pike | Mississippi R | N | 29.7 | 449.0 | 445.0 | 13,000 | 12,000 | R&H Act, Jul 3/30. R&H Act, Aug 30/35.
L&D 25 | MO Lincoln | Mississippi R | N | 49.7 | 434.0 | 429.7 | 18,000 | 16,600 | R&H Act, Jul 3/30. R&H Act, 8/30/35.
L&D 26 | IL Madison | Mississippi R | N | 107.1 | 419.0 | 414.0 | 30,000 | 27,700 | R&H Act, Jul 3/30. R&H Act, 8/30/1935.
Larose to Golden Meadow Hurr Prot FG | LA LaFourche | Bayou LaFourche | F | 0.0 | 3.0 | 3.0 | 0 | 0 | FCA Oct 65, PL 89-298.
Little Sun flower CS | MS Issaquena | Lit. Sunflower | F | 0.0 | 85.0 | 60.0 | 0 | 0 | FCA 1941.
Lk #9 Culvert & PS | KY Fulton | Mississippi | F | 6.5 | 286.0 | 282.0 | 0 | 0 | FCA Oct 65.
Lk Chicot PS | AR Chicot | Macon Lk | FCR | 0.0 | 118.2 | 90.0 | 0 | 0 | FCA Aug 68.
Lk Greeson | AR Pike | Little Missouri | P | 0.0 | 563.0 | 436.9 | 0 | 0 | FCA 1941.
FP | 407.9 | 563.0 | 504.0 | 9,800 | 2,500
Lk Ouachita | AR Garland | Ouachita | P | 0.0 | 592.0 | 480.0 | 0 | 0 | FCA Dec 44.
Long Branch DS | LA Catahoula | Catahoula Div | F | 0.0 | 32.5 | 32.5 | 0 | 0 | FCA May 50.
Mark Twain Lk | MO Ralls | Salt R | F | 894.0 | 638.0 | 606.0 | 38,400 | 18,600 | HD 507.
PMCAR | 457.0 | 606.0 | 567.2 | 18,600 | 5,900
Marked Tree Siphon | AR Poinsett | St. Francis | F | 0.0 | 229.0 | 198.3 | 0 | 0 | FCA Jun 30.
Morganza Div CS | LA Point Coupee | Morganza Floodway | F | 0.0 | 59.5 | 49.0 | 0 | 0 | FCA May 28.
Muddy Bayou CS | MS Warren | Muddy Bayou | FC | 30.0 | 76.9 | 70.0 | 4,350 | 2,860 | FCA Oct 65.
Old River Div CS Low Sill Overbank & Aux | LA W. Feliciana | Old R | F | 0.0 | 70.0 | 5.0 | 0 | 0 | PL 83-780.
Old River Lock | LA W Feliciana | Old R | N | 0.0 | 65.4 | 10.0 | 0 | 0 | FCA Sep 54, PL 780-83.
Port Allen Lock | LA Port Allen | GIWW | N | 0.0 | 46.1 | 2.6 | 0 | 0 | RHA Jul 46.
Prairie Dupont East & West PS | IL St Clair | IDD | F | 0.0 | 0.0 | 0.0 | 0 | 0 | FC Act 62.
Rapides-Boeuf Div Canal CS | LA Rapides | Bayou Rapides | F | 0.0 | 66.0 | 62.2 | 0 | 0 | FCA Aug 41, GD 359-77.
Rend Lk | IL Franklin | Big Muddy R | F | 109.0 | 405.0 | 410.0 | 24,800 | 18,900 | HD 541.
MA | 160.0 | 405.0 | 391.3 | 18,900 | 5,400
Sardis Lk | MS Panola | Little Sunflower | F | 1,569.9 | 281.4 | 236.0 | 58,500 | 10,700 | FCA Jun 36.
Schooner Bayou CS & Lock | LA Vermilion | Schooner Bayou | I | 0.0 | 1.2 | 1.2 | 0 | 0 | FCA Aug 41.
Shelbyville Lk | IL Shelby | Kaskaskia R | F | 474.0 | 626.5 | 599.7 | 25,300 | 11,100 | HD 232.
NMCAR | 180.0 | 599.7 | 573.0 | 11,100 | 3,000
Sorrell Lock | LA Iberville | GIWW | N | 0.0 | 29.7 | 3.5 | 0 | 0 | FCA May 28.
St Francis Lk CS | AR Poinsett | Oak Donnick Floodway | C | 0.0 | 0.0 | 210.0 | 0 | 2,240 | FCA Oct 65.
Steele Bayou CS | MS Issaquena | Steele Bayou | F | 0.0 | 68.5 | 60.0 | 0 | 0 | FCA 1941.
Tchula Lk Lower FG | MS Humphreys | Tchula Lk | F | 0.0 | 110.0 | 84.0 | 0 | 0 | FCA Jun 36.
Tchula Lk Upper FG | MS Humphreys | Tchula Lk | F | 0.0 | 108.0 | 92.0 | 0 | 0 | FCA Jun 36.
Teche-Vermilion PS & CS | LA St Mary | Atchafalaya R | MI | 0.1 | 18.0 | 16.0 | 0 | 0 | PL 89-789, FCA May 28.
Tensas-Cocodrie PS | LA Cocordia | Bayou Corcodrie | F | 0.0 | 37.0 | 23.0 | 0 | 0 | FCA Oct 65.
Treasure Island PS | MO Dunklin | Little R | F | 23.4 | 252.0 | 235.0 | 7,800 | 180 | FCA Jul 46.
Wallace Lk | LA Caddo | Cypress Bayou | F | 96.1 | 158.0 | 142.0 | 9,300 | 2,300 | RHA Mar 45, PL 75-761.
Wappapello Lk | MO Wayne | St Francis R | F | 613.2 | 394.7 | 354.7 | 23,200 | 5,200 | HD 159.
Wasp Lk | MS Humphreys | Wasp Lk-Bear Cr | F | 0.0 | 111.6 | 88.5 | 0 | 0 | FCA Jun 36.
West Hickman PS | KY Fulton | Mississippi | F | 0.0 | 302.0 | 296.0 | 9 | 4 | FCA 1948.
Wood R PS | IL Madison | IDD | F | 0.0 | 0.0 | 0.0 | 0 | 0 | FC Act 38.
Yazoo City PS | MS Yazoo | Yazoo | F | 0.0 | 96.0 | 69.0 | 0 | 0 | FCA Jun 36.
Missouri River Division
Bear Creek Dam & Res | CO Jefferson | Bear Cr | F | 28.8 | 5,635.5 | 5,558.0 | 718 | 109 | PL 90-483.
FCR | 1.9 | 5,558.0 | 5,528.0 | 109 | 17 | SD 87-90.
Big Bend Dam & Lk Sharpe | SD Lyman Buffalo Hughes | Missouri R | F | 61.0 | 1,423.0 | 1,422.0 | 61,000 | 60,000 | PL 78-534.
FNPIMCAR | 117.0 | 1,422.0 | 1,420.0 | 60,000 | 57,000 | SD 247-78.
Blue Springs Dam & Lk | MO Jackson | Little Blue R | F | 15.8 | 820.0 | 802.0 | 982 | 722 | PL 90-483.
FRC | 10.8 | 802.0 | 760.0 | 722 | 0 | HD 169-90.
Blue Stem Lake & Dam 4 | NE Lancaster | Olive Br. Salt Creek | F | 7.2 | 1,322.5 | 1,307.4 | 660 | 315 | PL 85-500.
FCR | 3.0 | 1,307.4 | 1,277.0 | 315 | 1 | HD 396-84.
Bowman-Haley Dam & Res | ND Bowman | No Fk Grand River | F | 72.7 | 2,777.0 | 2,754.8 | 5,131 | 1,732 | PL 87-874.
FMCR | 15.5 | 2,754.8 | 2,740.0 | 1,732 | 565 | HD 574-87.
Branched Oak Lk & Dam 18 | NE Lancaster | Oak Creek trib. Salt Creek | F | 71.6 | 1,311.0 | 1,284.0 | 3,640 | 1,780 | PL 85-500.
FCR | 26.0 | 1,284.0 | 1,250.0 | 1,780 | 0 | HD 396-84.
Bull Hook Dam | MT Hill | Bull Hook Cr Scott Coulee | F | 6.5 | 2,593.0 | 2,540.0 | 283 | 0 | PL 78-534.
Cedar Canyon Dam | SD Pennington | Deadman's Gulch | F | 0.1 | 3,545.0 | 3,526.0 | 11 | 2 | PL 80-858.
Chatfield Dam & Res | CO Douglas | S Platte | F | 204.7 | 5,500.0 | 5,432.0 | 4,742 | 1,412 | PL 81-516.
FQ | 26.7 | 5,432.0 | 5,385.0 | 1,412 | 12 | HD 669-80.
Cherry Cr Dam & Res | CO Araphahoe | Cherry Cr | F | 80.0 | 5,598.0 | 5,550.0 | 2,637 | 852 | PL 77-228.
FR | 14.0 | 5,550.0 | 5,504.0 | 852 | 0 | HD 426-76, PL 78-534.
Clinton Dam & Lk | KS Douglas | Wakarusa R | F | 267.8 | 903.4 | 875.5 | 12,891 | 7,006 | PL 87-874.
FMCAR | 129.2 | 875.5 | 820.0 | 7,006 | 0 | SD 122-87.
Cold Brook Dam & Res | SD Fall River | Cold Brook | F | 6.7 | 3,651.4 | 3,585.0 | 198 | 36 | PL 77-228.
FR | 0.5 | 3,585.0 | 3,548.0 | 36 | 0 | HD 655-76.
Conestoga Lake & Dam 12 | NE Lancaster | Holmes Cr Trib to Salt Cr | F | 8.0 | 1,252.0 | 1,232.9 | 620 | 230 | PL 85-500.
FCR | 2.6 | 1,232.9 | 1,197.0 | 230 | 1 | HD 396-84.
Cottonwood Springs Dam & Res | SD Fall River | Cottonwood Springs Cr | F | 7.7 | 3,936.0 | 3,875.0 | 214 | 44 | PL 77-228.
FR | 0.2 | 3,875.0 | 3,868.0 | 44 | 30 | HD 655-76.
Fort Peck Dam & Res | MT Valley, Mc Cone Garfield | Missouri R | F | 977.0 | 2,250.0 | 2,246.0 | 249,000 | 240,000 | PL 73-409.
FNPIMCAR | 13,649.0 | 2,246.0 | 2,160.0 | 240,000 | 92,000 | PL 75-529, HD 238-73. PL 78-534, SD 247-78.
Fort Randall Dam, Lk Francis Case | SD Gregory Charles | Missouri R | F | 985.0 | 1,375.0 | 1,365.0 | 102,000 | 95,000 | PL 78-534.
FNPIMCAR | 3,021.0 | 1,365.0 | 1,320.0 | 95,000 | 41,000 | SD 247-78.
Garrison Dam, Lk Sakakawea | ND Mercer McLean | Missouri R | F | 1,494.0 | 1,854.0 | 1,850.0 | 382,000 | 365,000 | PL 78-534.
FNPIMCAR | 17,440.0 | 1,850.0 | 1,775.0 | 365,000 | 129,000 | SD 247-78.
Gavins Point Dam, Lewis & Clark Lk | SD Yankton | Missouri R | F | 61.0 | 1,210.0 | 1,208.0 | 32,000 | 29,000 | PL 78-534.
NE Knox | FNPIMCAR | 95.0 | 1,208.0 | 1,204.5 | 29,000 | 25,000 | SD 247-78.
Glenn Cunningham Lk, Dam 11 | NE Douglas | Little Papillion Cr | F | 14.0 | 1,142.0 | 1,121.0 | 922 | 392 | PL 90-483.
FRCA | 3.9 | 1,121.0 | 1,085.0 | 392 | 0 | HD 349-90.
Harlan County Lk | NE Harlan | Republican R | F | 498.0 | 1,973.5 | 1,946.0 | 23,064 | 13,249 | PL 77-228.
FI | 342.6 | 1,946.0 | 1,875.0 | 13,249 | 0 | HD 892-76, PL-78-534.
Harry S Truman Dam & Res | MO Benton | Osage R | F | 4,005.9 | 739.6 | 706.0 | 209,300 | 55,600 | PL 83-780.
FPCR | 1,203.4 | 706.0 | 635.0 | 55,600 | 0 | HD 549-81, PL 87-874. HD 578-87.
Hillsdale Lk | KS Miami | Big Bull Cr | F | 83.6 | 931.0 | 917.0 | 7,410 | 4,580 | PL 83-780.
FNMCAR | 76.3 | 917.0 | 852.4 | 4,580 | 0 | HD 642-81.
Holmes Park Lk & Dam 17 | NE Lancaster | Antelope Cr Trib to Salt Cr | F | 5.7 | 1,266.0 | 1,242.4 | 410 | 100 | PL 85-500.
FCR | 0.8 | 1,242.4 | 1,218.0 | 100 | 3 | HD 396-84.
Kanopolis Lk | KS Ellsworth | Smoky Hill R | F | 370.0 | 1,508.0 | 1,463.0 | 13,999 | 3,560 | PL 75-761.
FI | 55.8 | 1,463.0 | 1,425.0 | 3,560 | 0 | PL 78-534, HD 842-76.
Kelly Road Dam | CO Araphoe | Westerly Cr | F | 0.3 | 5,362.0 | 5,342.0 | 38 | 0 | PL 80-858, PL 84-99.
Long Branch Lk | MO Randolph | Little East Fk Chariton R | F | 30.4 | 801.0 | 791.1 | 3,670 | 2,429 | PL 89-298.
FCAR | 34.6 | 791.0 | 751.1 | 2,429 | 0 | HD 238-89.
Longview Lk | MO Jackson | Little Blue R | F | 24.8 | 909.0 | 891.0 | 1,960 | 930 | PL 90-483.
FCAR | 22.1 | 891.0 | 810.0 | 930 | 0 | HD 169-90.
Melvern Lk | KS Osage | Marais des Cygnes R | F | 208.4 | 1,057.0 | 1,036.0 | 13,948 | 6,928 | PL 83-780.
FNMCAR | 154.4 | 1,036.0 | 960.0 | 6,928 | 0 | PL 75-761, HD 549-81.
Milford Lk | KS Geary | Republican R | F | 756.7 | 1,176.2 | 1,144.4 | 27,255 | 17,270 | PL 83-780.
FCA | 388.8 | 1,144.4 | 1,080.0 | 15,709 | 0 | HD 642-81, PL 75-761.
Oahe Dam & Lk | ND 4 Counties | Missouri R | F | 1,097.0 | 1,620.0 | 1,617.0 | 373,000 | 359,000 | PL 78-534.
SD 8 Counties | FNPIMCAR | 16,789.0 | 1,617.0 | 1,540.0 | 359,000 | 117,000 | SD 247-78.
Olive Cr Lk & Dam 2 | NE Lancaster | Olive Br of Salt Cr | F | 4.0 | 1,350.0 | 1,335.0 | 355 | 174 | HD 396-84.
FCR | 1.5 | 1,335.0 | 1,314.0 | 174 | 4 | PL 85-500.
Papio Dam Site #18 & Lk | NE Douglas | Boxelder Cr Papio Cr | F | 7.1 | 1,128.2 | 1,110.0 | 595 | 255 | PL 90-483.
FCAR | 3.4 | 1,110.0 | 1,060.5 | 255 | 0 | HD 349-90.
Papio Dam Site #20 & Lk | NE Sarpy | Trib South Branch Papio | F | 6.1 | 1,113.1 | 1,096.0 | 493 | 246 | PL 90-483.
FCAR | 2.7 | 1,096.0 | 1,069.0 | 246 | 10 | HD 349-90.
Pawnee Lk & Dam 14 | NE Lancaster | No. Middle Cr of Salt Cr | F | 21.0 | 1,263.5 | 1,244.3 | 1,470 | 728 | PL 85-500.
FCR | 8.5 | 1,244.3 | 1,206.0 | 728 | 1 | HD 396-84.
Perry Lk | KS Jefferson | Delaware R | F | 521.9 | 920.6 | 891.5 | 25,342 | 12,202 | PL 83-780.
FN | 243.2 | 891.5 | 825.0 | 122 | 0 | HD 642-81.
Pipestem Dam & Res | ND Stutsman | Pipestem Cr | F | 137.0 | 1,496.3 | 1,442.4 | 4,754 | 885 | PL 89-298.
FRC | 9.6 | 1,442.4 | 1,415.0 | 885 | 62 | HD 266-89.
Pomme De Terre Lk | MO Polk | Pomme De Terre R | F | 407.2 | 874.0 | 839.0 | 15,980 | 7,890 | PL 75-761.
FNPCAR | 241.6 | 839.0 | 750.0 | 7,890 | 0 | HD 549-81, PL 83-780.
Pomona Lk | KS Osage | 110 Mile Cr | F | 176.8 | 1,003.0 | 974.0 | 8,520 | 400 | PL 83-780.
FNMAR | 70.6 | 974.0 | 912.0 | 4,000 | 0 | HD 549-81.
Rathbun Lk | IA Appanoose | Chariton R | F | 346.3 | 926.0 | 904.0 | 20,948 | 11,013 | PL 83-780.
FNM | 205.4 | 904.0 | 844.0 | 11,013 | 0 | HD 561-81.
Smithville Lk | MO Clay | Little Platte R | F | 101.8 | 876.2 | 864.2 | 9,995 | 7,192 | PL 89-298.
FMCAR | 144.6 | 864.2 | 799.0 | 7,192 | 0 | HD 262-89.
Spring Gulch Imbankment | CO Douglas | Spring Gulch | F | 1.8 | 5,600.00 | 5,535.0 | 88 | 0 | PL 81-516, HD 669-80.
Stagecoach Lk & Dam 9 | NE Lancaster | Hickman Br of Salt Cr | F | 4.7 | 1,285.0 | 1,271.1 | 490 | 196 | PL 85-500.
> | FRC | 1.9 | 1,271.1 | 1,246.0 | 196 | 0 | HD 396-84.
Standing Bear Lk & Dam 16 | NE Douglas | Trib Big Papillion Cr | F | 3.7 | 1,121.0 | 1,104.0 | 302 | 137 | PL 90-483.
FRC | 1.5 | 1,104.0 | 1,060.0 | 137 | 0 | HD 349-90.
Stockton Lk | MO Cedar | Sac R | F | 779.6 | 892.0 | 867.0 | 38,288 | 24,777 | PL 83-780.
FARPN | 887.1 | 867.0 | 760.0 | 24,777 | 0 | HD 549-89.
Tuttle Creek Lk | KS Riley | Big Blue R | F | 1,937.4 | 1,136.0 | 1,075.0 | 54,179 | 14,875 | PL 75-761.
FN | 177.1 | 1,075.0 | 1,061.0 | 14,875 | 0 | HD 842-76.
Twin Lakes & Dam 13 | NE Seward | Middle Cr Salt Cr | F | 5.3 | 1,355.0 | 1,341.0 | 505 | 255 | PL 85-500.
CFR | 2.8 | 1,341.0 | 1,306.0 | 255 | 1 | HD 396-84.
Wagon Train Lk & Dam 8 | NE Lancaster | Hickman Br of Salt Cr | F | 6.8 | 1,302.0 | 1,287.8 | 660 | 303 | PL 85-500.
FCR | 2.5 | 1,287.8 | 1,260.0 | 303 | 4 | HD 396-84.
Wehrspann Lk & Dam 20 | NE Sarpy | Trib South Branch Papio | F | 6.1 | 1,113.1 | 1,096.0 | 493 | 246 | PL 90-483.
FCAR | 2.7 | 1,096.0 | 1,069.0 | 246 | 10 | HD 349-90.
Wilson Lk | KS Russell | Saline R | F | 530.7 | 1,554.0 | 1,516.0 | 19,980 | 9,040 | PL 78-534.
FRC | 247.8 | 1,516.0 | 1,440.0 | 9,040 | 0 | SD 191-78, SD 247-78.
Yankee Hill Lk & Dam 10 | NE Lancaster | Cardwell Br of Salt Cr | F | 5.6 | 1,262.0 | 1,244.9 | 475 | 208 | PL 85-500.
FCR | 2.0 | 1,244.9 | 1,218.0 | 208 | 0 | HD 396-84.
North Atlantic Division
Almond Lake | NY Steuben | Canacadea Cr | F | 14.6 | 1,300.0 | 1,255.0 | 489 | 124 | PL 74-738.
Alvin R. Bush Dam | PA Clinton | Kettle Cr | F | 73.4 | 937.0 | 840.0 | 1,430 | 160 | FCA Sep 54.
Arkport Dam | NY Steuben | Canisteo R | F | 8.0 | 1,304.0 | 1,218.0 | 192 | 0 | PL 74-738.
Aylesworth Cr Lk | PA Lackawanna | Aylesworth Cr | F | 1.7 | 1,150.0 | 1,108.0 | 87 | 7 | PL 87-874.
Beltzville Dam & Lk | PA Carbon, Monroe | Pohopoco Cr | F | 27.0 | 651.0 | 628.0 | 1,411 | 947 | PL 87-874.
FMA | 39.8 | 628.0 | 537.0 | 947 | 113
Bloomington Lk | MD Garret | North Branch Potomac R | F | 36.2 | 1,500.0 | 1,466.0 | 1,184 | 952 | PL 87-874.
FMA | 92.0 | 1,466.0 | 1,255.0 | 952 | 42
Blue Marsh Dam & Lk | PA Lebanon Berks | Tulpehocken CR | F | 27.1 | 307.0 | 290.0 | 2,159 | 1,147 | PL 87-874.
FMA | 19.9 | 290.0 | 261.0 | 1,147 | 323
Cowanesque Lk | PA Tioga | Cowanesque R | F | 82.0 | 1,117.0 | 1,045.0 | 2,060 | 410 | PL 85-500.
Curwensville Lk | PA Clearfield | West Branch Susquehanna R | F | 114.7 | 1,228.0 | 1,162.0 | 3,020 | 790 | FCA Sep 54.
East Sidney Lk | NY Delaware | Ouleout Cr | F | 30.2 | 1,203.0 | 1,150.0 | 1,100 | 210 | PL 74-738.
Foster Joseph Sayers Dam | PA Centre | Bald Eagle Cr | F | 70.2 | 657.0 | 630.0 | 3,450 | 1,730 | FCA Sept 54.
Francis E. Walter Dam & Res | PA Carbon, Luzerne, Monroe | Lehigh R | F | 107.8 | 1,450.0 | 1,300.0 | 1,830 | 80 | PL 79-526.
Gathright Dam & Lk Moomaw | VA Alleghany, Bath | Jackson R | F | 79.9 | 1,610.0 | 1,582.0 | 3,160 | 2,530 | PL 79-526.
AR | 60.7 | 1,582.0 | 1,554.0 | 2,530 | 1,780
General Edgar Jadwin Dam | PA Wayne | Dyberry Cr | F | 24.5 | 1,053.0 | 973.0 | 659 | 0 | PL 80-858.
Prompton Dam & Res | PA Wayne | W Br Lackawaxen R | F | 48.5 | 1,205.0 | 1,125.0 | 910 | 290 | PL 80-858.
Raystown Lk | PA Huntingdon | Raystown Br | F | 248.0 | 812.0 | 786.0 | 10,800 | 8,300 | PL 87-874.
FR | 514.0 | 786.0 | 622.8 | 8,300 | 150
Stillwater Lk | PA Susquehanna | Lackawanna R | F | 11.6 | 1,621.0 | 1,572.0 | 422 | 83 | PL 77-228.
Tioga-Hammond Lakes Hammond | PA Tioga | Crooked Cr | F | 54.2 | 1,131.0 | 1,086.0 | 1,770 | 680 | PL 85-500.
Tioga-Hammond Lakes Tioga | PA Tioga | Tioga R | F | 52.5 | 1,131.0 | 1,081.0 | 1,630 | 470 | PL 85-500.
Whitney Piont Lk | NY Broome | Otselic R | F | 66.5 | 1,010.0 | 973.0 | 3,340 | 1,200 | PL 74-738.
York Indian Rock Dam | PA York | Codorus Cr | F | 28.0 | 435.0 | 370.0 | 1,430 | 0 | PL 74-738.
North Central Division
Badhill Dam & Res | ND Barnes | Sheyenne R | FM | 68.6 | 1,266.0 | 1,257.2 | 5,430 | 4,430 | FCA Dec 44.
Brandon Road L&D | IL Will | Illinois R | N | 8.0 | 539.0 | 538.0 | 300 | 250 | PL 71-126.
Cedars L&D | WI Outagamie | Fox R | N | 1.8 | 703.6 | 698.7 | 255 | 140 | RHA of 1882, 1885.
Coralville Dam & Res | IA Johnson | Iowa R | F | 439.0 | 712.0 | 680.0 | 24,800 | 3,580 | PL 75-761.
C | 40.3 | 680.0 | 652.0 | 3,580 | 0 | PL 75-761.
Depree L&D | WI Brown | Fox R | N | 9.4 | 591.0 | 586.7 | 926 | 0 | PL 71-126.
Dresden Island L&D | IL Grundy | Illinois R | N | 1.0 | 505.0 | 504.0 | 1,690 | 1,550 | FCA 1958.
Eau Galle Dam & Res | WI Pierce | Eau Galle R | FCR | 1.6 | 940.0 | 938.5 | 1,500 | 1,350 | PL 78-534.
Farmdale Dam | IL Tazwell | Farm Cr | F | 11.3 | 616.0 | 551.0 | 385 | 0 | PL 78-534.
Fondulac Dam | IL Tazwell | Fondulac Cr | F | 2.3 | 579.0 | 530.0 | 97 | 0 | PL 78-534.
Gull Lk Dam & Res | MN Cass | Gull R | N | 70.4 | 1,194.0 | 1,192.7 | 13,100 | 12,700 | RHA 1899.
Highway 75 Dam & Res | MN Bigstone, Lacqui, Parle | Minnesota R | FC | 11.1 | 952.3 | 947.3 | 2,790 | 910 | FCA Oct 65.
Homme Dam & Res | ND Walsh | Park R | FM | 3.7 | 1,080.0 | 1,074.0 | 190 | 176 | FCA of 22 Dec 44.
L&D 1 | MN Hennepin, Ramsey | Mississippi R | N | 13.0 | 725.1 | 722.8 | 5,800 | 5,500 | RHA 1910.
L&D 2 | MN Dakota, Wash | Mississippi R | N | 8.0 | 687.2 | 686.5 | 11,810 | 11,000 | RHA 1927.
L&D 3 | MN Goodhue, Pierce | Mississippi R | N | 17.8 | 675.0 | 674.0 | 17,950 | 17,650 | RHA 1930.
L&D 4 | WI Wabasha, Buffalo | Mississippi R | N | 18.0 | 667.0 | 666.5 | 38,820 | 36,600 | RHA 1930.
L&D 5 | MN Winona, Buffalo | Mississippi R | N | 6.2 | 660.0 | 659.5 | 12,680 | 12,000 | RHA 1930.
L&D 5A | MN Winona, Buffalo | Mississippi R | N | 7.2 | 651.0 | 650.0 | 7,500 | 7,000 | RHA 1930.
L&D 6 | MN Winona | Mississippi R | N | 8.4 | 645.5 | 644.5 | 8,870 | 8,000 | RHA 1930.
L&D 7 | MN Winona | Mississippi R | N | 2.6 | 639.0 | 639.0 | 13,440 | 13,400 | RHA 1930.
WI LaCrosse
L&D 8 | MN Houston | Mississippi R | N | 20.4 | 631.0 | 630.0 | 20,800 | 20,000 | RHA 1930.
WI Vernon
L&D 9 | WI Crawford | Mississippi R | N | 28.7 | 620.0 | 619.0 | 29,125 | 28,300 | RHA 1930.
IA Allamakee
L&D 10 | IA Clayton | Mississippi R | N | 16.8 | 611.0 | 610.0 | 17,070 | 16,500 | RHA 1930.
WI Grant
L&D 11 | IA Dubuque | Mississippi R | N | 19.1 | 603.1 | 602.0 | 21,100 | 20,000 | PL 71-520.
L&D 12 | IA Jackson | Mississippi R | N | 12.2 | 592.1 | 591.0 | 13,000 | 12,400 | PL 71-520.
L&D 13 | IL Whiteside | Mississippi R | N | 24.2 | 583.1 | 582.0 | 30,000 | 28,500 | PL 71-520.
L&D 14 | IA Scott | Mississippi R | N | 9.0 | 572.1 | 571.0 | 10,500 | 9,980 | PL 71-520.
L&D 15 | IL Rock Island | Mississippi R | N | 5.5 | 561.1 | 559.0 | 3,725 | 3,540 | PL 71-520.
L&D 16 | IL Rock Island | Mississippi R | N | 12.1 | 545.1 | 544.0 | 13,000 | 12,400 | PL 71-520.
L&D 17 | IL Mercer | Mississippi R | N | 7.5 | 537.1 | 536.0 | 7,580 | 7,200 | PL 71-520.
L&D 18 | IL Henderson | Mississippi R | N | 11.0 | 529.1 | 528.0 | 13,300 | 12,600 | PL 71-520.
L&D 19 | IA Lake | Mississippi R | N | 55.0 | 518.2 | 517.2 | 33,500 | 31,800 | PL 71-520.
L&D 20 | MO Lewis | Mississippi R | N | 5.8 | 481.5 | 476.5 | 7,960 | 7,550 | PL 71-520.
L&D 21 | IL Adams | Mississippi R | N | 8.6 | 470.1 | 469.6 | 9,390 | 8,910 | PL 71-520.
L&D 22 | MO Polke | Mississippi R | N | 8.4 | 459.6 | 459.1 | 8,660 | 8,230 | PL 71-520.
Lac qui Parle Dam & Res | MN Chippewa Swift | Minnesota R | FC | 119.3 | 941.1 | 931.2 | 13,500 | 6,400 | FCA of 22 Jun 36.
Lagrange L&D | IL Brown | Illinois R | N | 0.0 | 429.0 | 429.0 | 10,500 | 10,500 | PL 73-184.
Leech Lake Dam & Res | MN Cass | Leech R | N | 300.2 | 1,295.7 | 1,293.2 | 139,000 | 107,200 | RHA of 1882 1895.
Little Kaukauna L&D | WI Brown | Fox R | N | 3.6 | 601.0 | 592.8 | 447 | 42.0 | RHA of 1882 1885.
Little Chute L&D | WI Outagamie | Fox R | N | 0.4 | 694.2 | 688.9 | 74 | 67 | RHA of 1882 1885.
Lockport Lock | IL Will | Chicago San Ship Canal | FNP | 2.7 | 579.0 | 577.5 | 1,850 | 1,800 | RHA 1930.
Lower Appleton L&D | WI Outagamie | Fox R | N | 0.2 | 710.9 | 706.3 | 43 | 40 | RHA of 1882 1895.
Marseilles Lk & Dam | IL LaSalle | Illinois R | N | 0.7 | 483.0 | 482.8 | 1,400 | 1,320 | PL 71-126.
Marsh Lake Dam & Res | MN Swift, Lacqui, Parle | Minnesota R | FC | 23.9 | 941.1 | 937.6 | 8,650 | 5,150 | FCA Jun 36.
Menasha Dam Lk Winnebago | WI Winnebago | Fox R | FN | 452.0 | 746.8 | 743.5 | 181,120 | 168,500
Mount Morris Dam | NY Livingston | Genesee R | F | 337.4 | 760.0 | 585.0 | 3,300 | 0 | PL 74-738.
O'Brien L&D | IL Cook | Calumet | N | 0.3 | 581.9 | 578.2 | 50 | 50 | RHA of 1946.
Peoria L&D | IL Peoria | Illinois R | N | 0.0 | 440.0 | 440.0 | 27,800 | 27,800 | PL 73-184.
Pine Dam & Res | MN Crow Wing | Pine R | N | 40.4 | 1,230.3 | 1,227.3 | 13,900 | 13,000 | RHA of 1899.
Pokegama Dam & Res | MN Itasca | Mississippi R | N | 52.4 | 1,274.4 | 1,270.3 | 13,700 | 12,000 | RHA of 1899.
Rapid Croche L&D | WI Outagamie | Fox R | N | 3.4 | 608.5 | 602.1 | 568 | 0 | RHA 1885.
Red Lake Dam & Res | MN Clearwater | Red Lake R | FA | 1,810.0 | 1,174.0 | 1,173.5 | 288,800 | 287,300 | FCA Dec 44.
Red Rock Dam & Res | IA Marion | Des Monies R | F | 1,670.0 | 780.0 | 728.0 | 65,400 | 8,000 | PL 75-761.
R | 72.0 | 728.0 | 690.0 | 8,000 | 0 | PL 75-761.
Reservation Control Res | MN Traverse | FC | 58.8 | 981.0 | 976.0 | 12,400 | 10,950 | FCA 1936.
SD Roberts
Sandy Lake Dam & Res | MN Aitkin | Sandy R | N | 37.5 | 1,218.3 | 1,214.3 | 10,600 | 8,200 | RHA of 1899.
Saylorville Dam & Res | IA Polk | Des Moines R | F | 586.0 | 890.0 | 836.0 | 16,700 | 5,950 | FCA 1936.
P | 90.0 | 836.0 | 810.0 | 5,950 | 0 | FCA.
St Anthony Falls Lwr L&D | MN Hennepin | Mississippi R | N | 0.0 | 750.0 | 750.0 | 50 | 50 | RHA of 1937 1945.
St Anthony Falls Upr L&D | MN Hennepin | Mississippi R | N | 17.4 | 801.0 | 799.0 | 8,800 | 8,600 | RHA of 1937 1945.
Starved Rock L&D | IL LaSalle | Illinois R | N | 1.0 | 459.0 | 458.0 | 1,155 | 1,020 | PL 69-100.
Upper Appleton L&D | WI Outagamie | Fox R | N | 7.4 | 738.7 | 735.4 | 1,171 | 1,040 | RHA of 1882 1885.
Upper Kaukauna L&D | WI Outagamie | Fox R | N | 1.1 | 656.8 | 652.8 | 134 | 115 | RHA of 1882 1885.
White Rock Dam & Res | MN Traverse | Bois De Souix | FC | 78.6 | 981.0 | 972.0 | 10,500 | 4,000 | FCA 1936.
SD Roberts
Winnibigoshish Dam & Res | MN Cass Itasca | Mississippi R | N | 98.7 | 1,300.9 | 1,296.9 | 98,700 | 62,000 | RHA of 1899.
New England Division
Ball Mountain Lk | VT Windham | West R | F | 52.4 | 1,017.0 | 830.5 | 810 | 20 | PL 78-534, 83-780.
Barre Falls Dam | MA Worcester | Ware R | F | 24.0 | 807.0 | 761.0 | 1,400 | 0 | PL 78-228.
Birch Hill Dam | MA Worcester | Millers R | F | 49.9 | 852.0 | 815.0 | 3,200 | 0 | PL 75-761.
Black Rock Lk | CT Litchfield | Branch Brook | F | 8.5 | 520.0 | 437.0 | 190 | 21 | PL 86-45.
Blackwater Dam | NH Merrimack | Blackwater R | F | 46.0 | 566.0 | 515.0 | 3,280 | 0 | PL 75-111.
Buffumville Lk | MA Worcester | Little R | F | 11.3 | 524.0 | 492.5 | 530 | 200 | PL 77-228.
Colebrook River Lk | CT Litchfield | West Branch | F | 50.2 | 761.0 | 708.0 | 1,185 | 750 | PL 86-645.
MA Bekshire | Farmington R
Conant Brook Dam | MA Hampden | Conant Brook | F | 3.7 | 757.0 | 694.0 | 158 | 0 | PL 86-645.
East Brimfield Lk | MA Hampden, Worcester | Quinebaug R | F | 29.9 | 653.0 | 632.0 | 2,300 | 360 | PL 77-228.
Edward MacDowell Lk | NH HIllsboro | Nubanusit Brook | F | 12.8 | 946.0 | 911.0 | 840 | 165 | PL 75-111.
Everett Lk | NH Hillsboro, Merrimack | Piscataquog R | F | 91.5 | 418.0 | 340.0 | 2,900 | 130 | PL 75-761.
Franklin Falls Dam | NH Belknap, Merrimack | Pemigewasset R | F | 150.6 | 389.0 | 307.0 | 2,800 | 440 | PL 75-111.
Hancock Brook Lk | CT Litchfield | Hancock Brook | F | 3.9 | 484.0 | 460.0 | 266 | 40 | PL 86-645.
Hodges Village Dam | MA Worcester | French R | F | 13.3 | 501.0 | 465.5 | 740 | 0 | PL 77-228.
Hop Brook Lk | CT New Haven | Hop Brook | F | 6.9 | 364.0 | 310.0 | 270 | 21 | PL 86-645.
Hopkinton Lk | NH Merrimack | Contoocook R | F | 70.1 | 416.0 | 380.0 | 3,700 | 220 | PL 75-761.
Knightville Dam | MA Hampshire | Westfield R | F | 49.0 | 610.0 | 480.0 | 960 | 0 | PL 75-761.
Littleville Lk | MA Hampden, Hampshire | Middle Br, Westfield R | F | 23.0 | 576.0 | 518.0 | 510 | 275 | PL 85-500.
Mansfield Hollow Lk | CT Tolland | Natchaug R | F | 49.2 | 257.0 | 205.5 | 1,880 | 200 | PL 77-228.
New Bedford-Fairhaven Hurr Barrier | MA Bristol | F | 0.0 | 0.0 | 0.0 | 0 | 0 | PL 85-500.
North Hartland Lk | VT Windsor | Ottauquechee R | F | 68.8 | 546.5 | 425.0 | 1,100 | 215 | PL 75-761.
North Springfield Lk | VT Windsor | Black R | F | 50.0 | 545.5 | 467.0 | 1,200 | 100 | PL 75-761.
Northfield Br Lk | CT Litchfield | Northfield Br | F | 2.4 | 576.0 | 500.0 | 67 | 7 | PL 86-645.
Otter Br Lk | NH Cheshire | Otter Brook | F | 17.6 | 781.0 | 701.0 | 374 | 70 | PL 83-780.
Stamford Hurr Barrier | CT Fairfield | F | 0.0 | 0.0 | 0.0 | 0 | 0 | PL 86-645.
Surry Mountain Lk | NH Cheshire | Ashuelot R | F | 31.7 | 550.0 | 500.0 | 970 | 260 | PL 75-761.
Thomaston Dam | CT Litchfield | Naugatuck R | F | 42.0 | 494.0 | 380.0 | 960 | 0 | PL 78-534.
Townshend Lk | VT Windham | West R | F | 32.9 | 553.0 | 478.0 | 735 | 95 | PL 78-534, PL 83-780.
Tully Lk | MA Worcester | East Br Tully R | F | 20.5 | 668.0 | 636.0 | 1,130 | 78 | PL 75-761.
Union Village Dam | VT Orange | Ompompanoosuc R | F | 38.0 | 564.0 | 420.0 | 740 | 0 | PL 74-738.
West Hill Dam | MA Worcester | West R | F | 12.4 | 264.0 | 234.0 | 1,025 | 0 | PL 78-534.
West Thomspon | CT Windham | Quinebaug R | F | 25.6 | 342.5 | 305.0 | 1,250 | 200 | PL 86-645.
Westville Lake | MA Worcester | Quinebaug R | F | 11.0 | 572.0 | 525.0 | 913 | 23 | PL 77-228.
North Pacific Division
Albeni Falls Dam, Lk Pend, Oreille | ID Bonner | Pend Oreille R | FNP | 1,155.0 | 2,062.5 | 2,049.7 | 95,000 | 86,000 | PL 81-516.
Applegate Lk | OR Jackson | Applegate R | FIR | 75.2 | 1,987.0 | 1,854.0 | 988 | 221 | FCA 1962, PL 87-874, PL 87-874.
Big Cliff Dam | OR Marion, Linn | N Santiam R | P | 3.5 | 1,206.0 | 1,182.0 | 130 | 98 | HD 544, PL 75-761, PL 87-874.
Blue River Lk | OR Lane | Blue R | F | 6.5 | 1,357.0 | 1,350.0 | 975 | 940 | HD 531.
FNI | 78.8 | 1,350.0 | 1,180.0 | 940 | 133 | PL 81-516.
Bonneville L&D Lk | WA Skamania | Columbia R | NP | 138.0 | 77.0 | 70.0 | 20,800 | 19,850 | RHA 1935.
Chena River Lakes | AK North Star Burough | Chena R | F | 34.0 | 506.7 | 490.0 | 5,400 | 400 | PL 90-483.
Chief Joseph Dam Rufus Woods Lk | WA Douglas, Okanogan | Columbia R | P | 192.3 | 956.0 | 930.0 | 8,400 | 6,800 | HD 693, PL 79-525.
Cottage Grove Lk | OR Lane | Coast Fk, Willamete R | F | 29.8 | 791.0 | 750.0 | 1,155 | 295 | HD 544, PL 75-761.
Cougar Lk | OR Lane | South Fk | F | 11.3 | 1,699.0 | 1,690.0 | 1,280 | 1,235 | HD 531.
FNPI | 143.9 | 1,690.0 | 1,532.0 | 1,235 | 635 | PL 81-516.
P | 9.9 | 1,532.0 | 1,516.0 | 635 | 602 | PL 83-870.
Detroit Lk | OR Marion | North Santiam | F | 19.1 | 1,569.0 | 1,563.0 | 3,490 | 3,455 | HD 544, PL 75-761.
FNPI | 281.6 | 1,563.5 | 1,450.0 | 3,455 | 1,725
P | 40.3 | 1,450.0 | 1,425.0 | 1,725 | 1,415
Dexter Dam | OR Lane | Middle Fk, Willamette R | FNPI | 4.8 | 695.0 | 690.0 | 990 | 940 | HD 544, PL 75-761.
Dorena Lk | OR Lane | Cow R | F | 5.5 | 835.0 | 832.0 | 1,885 | 1,815 | HD 544.
FNI | 65.0 | 832.0 | 770.5 | 1,815 | 520 | PL 75-761.
Dworshak Dam and Res | ID Clearwater | North Fk, Clearwater R | FNP | 2,016.0 | 1,600.0 | 1,445.0 | 17,090 | 9,050 | HD 403, PL 87-874.
Fall Cr Dam and Lk | OR Lane | Fall Cr | F | 7.5 | 834.0 | 830.0 | 1,865 | 1,760 | HD 531.
FNI | 107.5 | 830.0 | 728.0 | 1,760 | 460 | PL 81-516
Fern Ridge Lk | OR Lane | Long Tom R | F | 15.7 | 375.1 | 373.5 | 10,305 | 9,340 | HD 544.
FNI | 93.9 | 373.5 | 353.0 | 9,340 | 1,515 | PL 75-761
Foster Lake | OR Linn | South Santiam R | F | 4.9 | 641.0 | 637.0 | 1,260 | 1,195 | HD 544
FNPI | 24.9 | 637.0 | 613.0 | 1,195 | 895 | PL 86-645
Green Peter Lk | OR Linn | Middle Fk, Santiam R | F | 18.3 | 1,015.0 | 1,010.0 | 3,705 | 3,605 | HD 531.
FNPI | 249.9 | 1,010.0 | 992.0 | 3,605 | 2,072 | PL 81-516, PL 83-780.
Hills Creek Lk | OR Lane | Middle Fk, Willamette R | F | 5.6 | 1,543.0 | 1,541.0 | 2,850 | 2,710 | HD 531.
FNPI | 194.6 | 1,541.0 | 1,448.0 | 2,710 | 1,575 | PL 81-516.
Howard Hanson Dam | WA King | Green R | F | 80.0 | 1,206.0 | 1,141.0 | 1,750 | 763 | HD 531.
FA | 25.6 | 1,141.0 | 1,040.0 | 763 | 13 | PL 81-516.
Ice Harbor Dam Lk Sacajawea | WA Walla, Walla, Franklin | Snake R | NP | 24.9 | 440.0 | 437.0 | 8,370 | 8,210 | HD 704, PL 79-14.
John Day Dam Lk Umatilla | OR Sherman | Columbia R | F | 158.0 | 268.0 | 265.0 | 55,000 | 52,000 | HD 531.
FNP | 150.0 | 265.0 | 262.0 | 52,000 | 49,000 | PL 81-516.
F | 192.0 | 262.0 | 257.0 | 49,000 | 42,000
Libby Dam Lk Koocanusa | MT Lincoln | Kootenai R | FP | 4,979.5 | 2,459.0 | 2,287.0 | 46,365 | 14,391 | HD 531, PL 81-516.
Little Goose L&D Lk Bryan | WA Columbia, Whitman | Snake R | PN | 49.0 | 638.0 | 633.0 | 10,030 | 9,620 | HD 704, PL 79-14.
Lookout Point Lk | OR Lane | Middle Fk, Willamette R | P | 12.2 | 825.0 | 819.0 | 2,090 | 1,860 | HD 544.
FNPI | 324.2 | 926.0 | 825.0 | 4,255 | 2,090 | PL 75-761.
Lost Creek Lk | OR Jackson | Rogue R | FPIR | 315.0 | 1,872.0 | 1,751.0 | 3,430 | 1,800 | HD 566, PL 87-874.
Lower Granite L&D | WA Garfield, Whitman | Snake R | NPI | 43.6 | 738.0 | 733.0 | 8,900 | 8,540 | HD 704, PL 79-14.
Lucky Peak Dam and Lk | ID Ada | Boise R | F | 13.9 | 3,060.0 | 3,055.0 | 2,817 | 2,745 | PL 79-526.
FI | 264.4 | 3,055.0 | 2,905.0 | 2,817 | 802
Lwr Monumental L&D Lk HG West | WA Walla, Walla, Franklin | Snake R | NP | 20.0 | 540.0 | 537.0 | 6,700 | 6,550 | HD 704, PL 79-14.
McNary L&D, Dam Lk Wallula | WA Benton | Columbia R | NP | 185.0 | 340.0 | 335.0 | 38,800 | 36,000 | HD 704, PL 79-14.
OR Umatilla
Mill Creek Dam Lk | WA Walla, Walla | Mill Cr | F | 7.5 | 1,265.0 | 1,205.0 | 225 | 53 | HD 578, PL 75-761.
Mud Mountain Dam | WA King, Pierce | White R | F | 106.3 | 1,215.0 | 895.0 | 963 | 0 | PL 74-738.
The Dalles L&D Lk Celilo | WA Klickitat | Columbia R | NP | 52.5 | 160.0 | 155.0 | 11,200 | 10,350 | HD 531, PL 81-516.
OR Wasco
Willow Creek Lk | OR Morrow | Willow Cr | F | 11.6 | 2,113.5 | 2,047.0 | 269 | 96 | PL 89-298.
Wynoochee Dam and Lk | WA Grays, Harbor | Wynoochee R | FMCA | 65.4 | 800.0 | 700.0 | 1,170 | 193 | HD 601, PL 93-251.
Ohio River Division
Allegheny L&D 2 | PA Allegheny | Allegheny R | N | 0.0 | 721.0 | 710.0 | 0 | 0 | RHA 1935.
Allegheny L&D 3 | PA Allegheny | Allegheny R | N | 0.0 | 734.5 | 721.0 | 0 | 0 | RHA 1935.
Allegheny L&D 4 | PA Allegheny Westmoreland | Allegheny R | N | 0.0 | 745.0 | 734.5 | 0 | 0 | RHA 1912.
Allegheny L&D 5 | PA Armstrong | Allegheny R | N | 0.0 | 756.8 | 745.0 | 0 | 0 | RHA 1912
Allegheny L&D 6 | PA Armstrong | Allegheny R | N | 0.0 | 769.0 | 756.8 | 0 | 0 | RHA 1912.
Allegheny L&D 7 | PA Armstrong | Allegheny R | N | 0.0 | 782.1 | 769.0 | 0 | 0 | RHA 1912.
Allegheny L&D 8 | PA Armstrong | Allegheny R | N | 0.0 | 800.0 | 782.1 | 0 | 0 | RHA 1912, 1935.
Allegheny L&D 9 | PA Armstrong | Allegheny R | N | 0.0 | 822.0 | 800.0 | 0 | 0 | RHA 1935.
Allegheny Res Kinzua Dam | PA Warren | Allegheny R | F | 607.0 | 1,365.0 | 1,328.0 | 21,180 | 12,080 | PL 74-738.
FPCAR | 549.0 | 1,328.0 | 1,240.0 | 12,080 | 1,900
Alum Cr Lk | OH Delaware | Alum Cr | F | 53.1 | 901.0 | 888.0 | 4,852 | 3,387 | PL 87-874.
FMCR | 79.2 | 888.0 | 885.0 | 3,387 | 3,105
Atwood Lk | OH Tuscarawas | Indian Fk Cr | F | 26.1 | 941.0 | 928.0 | 2,460 | 1,540 | PW 1933.
FCR | 7.6 | 928.0 | 922.5 | 1,540 | 1,250
Barkley Dam Lk Barkley | Ky Lyon, Livgst | Cumberland R | F | 1,213.0 | 375.0 | 359.0 | 93,430 | 57,920 | PL 79-525.
FP | 259.0 | 359.0 | 354.0 | 57,920 | 45,210
N | 610.0 | 354.0 | 233.0 | 45,210 | 0
Barren River Lk | KY Allen, Barren | Barren R | F | 558.8 | 590.0 | 552.0 | 20,150 | 10,000 | PL 75-261.
FMR | 190.3 | 552.0 | 525.0 | 10,000 | 4,340
Beach City Lk | OH Tuscarawas | Sugar Cr | F | 69.9 | 976.5 | 948.0 | 6,150 | 420 | PW 1933.
FCR | 0.0 | 0.0 | 0.0 | 0 | 420
Beech Fk Lk | WV Wayne | Beech Fk Cr | F | 28.3 | 614.5 | 592.0 | 1,847 | 725 | PL 87-874.
FCR | 5.0 | 592.0 | 583.5 | 725 | 460
Belleville L&D | WV Wood | Ohio R | N | 0.0 | 582.0 | 560.0 | 0 | 0 | RHA 1909.
OH Meigs
Berlin Lk | OH Mahoning, Portage | Mahoning R | F | 38.3 | 1,032.0 | 1,024.7 | 5,500 | 3,590 | PL 75-761.
FMCAR | 56.6 | 1,024.7 | 1,016.5 | 3,590 | 2,200
Bluestone Lk | WV Summers | New R | F | 592.6 | 1,520.0 | 1,410.0 | 9,180 | 2,040 | PL 74-738.
FCR | 7.5 | 1,410.0 | 1,406.0 | 2,040 | 1,800 | PL 75-761.
Bolivar Dam | OH Stark, Tuscarawas | Sandy Cr | F | 149.6 | 962.0 | 895.0 | 6,500 | 0 | PW 1933.
Brookville Lk | IN Franklin | E Fork of Whitewater R | FMR | 128.4 | 748.0 | 713.0 | 5,260 | 2,430 | PL 75-761.
Buckhorn Lk | KY Leslie | Middle Fk of Kentucky R | F | 135.8 | 840.0 | 782.0 | 3,610 | 1,230 | PL 75-761.
FR | 21.8 | 782.0 | 757.0 | 1,230 | 550
Burnsville Lk | WV Braxton | L Kanawha R | F | 51.5 | 825.0 | 789.0 | 1,902 | 965 | PL 75-761.
FCAR | 10.2 | 789.0 | 776.0 | 965 | 553
CJ Brown Dam & Res | OH Clark | Buck Cr | F | 26.8 | 1,023.0 | 1,012.0 | 2,720 | 2,120 | PL 87-874.
CM Harden Lk | IN Parke | Raccoon Cr | F | 83.5 | 690.0 | 661.0 | 3,910 | 2,060 | PL 75-761
FAR | 33.1 | 661.0 | 640.0 | 2,060 | 1,100
Caesar Cr Lk | OH Warren | Caesar Cr | F | 140.2 | 883.0 | 849.0 | 6,110 | 2,830 | PL 75-761.
FMAR | 88.7 | 849.0 | 800.0 | 2,830 | 700
Cagles Mill Lk | IN Putman | Mill Cr | F | 201.0 | 704.0 | 636.0 | 4,840 | 1,400 | PL 75-761.
Cannelton L&D | KY Hancock | Ohio R | N | 0.0 | 383.0 | 358.0 | 0 | 0 | RHA 1909
IN Perry
Carr Fk Lk | KY Knott | Carr Cr | F | 25.1 | 1,055.0 | 1027.0 | 1,120 | 710 | PL 87-874.
FAR | 10.8 | 1,027.0 | 1009.0 | 710 | 530
Cave Run Lk | KY Rowan | Licking R | F | 391.5 | 765.0 | 730.0 | 14,870 | 8,270 | PL 74-738
FAR | 75.3 | 730.0 | 720.0 | 8,270 | 6,790
Center Hill Lk | TN Dekalb | Caney FK | F | 762.0 | 685.0 | 648.0 | 23,060 | 18,220 | PL 75-761.
P | 492.0 | 648.0 | 618.0 | 18,220 | 14,590
Charles Mill Lk | OH Ashland | Black Fk | F | 80.6 | 1,020.0 | 997.0 | 6,050 | 1,350 | PW 1933.
FCR | 4.5 | 997.0 | 993.0 | 1,350 | 827
Cheatham L&D | TN Cheatham | Cumberland R | P | 19.8 | 385.0 | 382.0 | 7,450 | 5,630 | RHA 1946, PL 396.
N | 84.2 | 382.0 | 345.0 | 5,630 | 0 | PL 396.
Clendening Lk | OH Harrison | Brush Fk | F | 27.5 | 910.5 | 898.0 | 2,620 | 1,800 | PW 1933.
FCR | 8.0 | 898.0 | 893.0 | 1,800 | 1,430
Conemaugh River Lk | PA Indiana, Westmoreland | Conemaugh R | F | 270.0 | 975.0 | 880.0 | 6,820 | 300 | PL 74-738, PL 75-761.
Cordell Hull Dam & Res | TN Smith | Cumberland R | PR | 17.8 | 504.5 | 499.0 | 12,200 | 9,820 | RHA 1946.
NR | 0.0 | 499.0 | 424.0 | 9,820 | 0
Crooked Cr Lk | PA Armstrong | Crooked Cr | F | 89.4 | 920.0 | 840.0 | 1,940 | 350 | PL 74-738, PL 75-761.
Dale Hollow Lk | TN Clay | Obey R | F | 353.0 | 663.0 | 651.0 | 30,990 | 27,700 | PL 75-761.
P | 496.0 | 651.0 | 631.0 | 27,700 | 21,880
Dashields L&D | PA Allegheny | Ohio R | N | 0.0 | 692.0 | 682.0 | 0 | 0 | RHA 1909.
Deer Cr Lk | OH Pickaway | Deer Cr | F | 81.5 | 844.0 | 810.0 | 4,046 | 1,277 | PL 75-761.
FCR | 14.6 | 810.0 | 796.0 | 1,277 | 727
Delaware Lk | OH Delaware | Olentangy R | F | 118.0 | 947.0 | 915.0 | 8,550 | 1,270 | PL 75-761
FCAR | 5.6 | 915.0 | 910.0 | 1,270 | 950
Dewey Lk | KY Floyd | Johns Cr | F | 76.1 | 686.0 | 650.0 | 3,340 | 1,100 | PL 75-761
FCR | 4.9 | 650.0 | 645.0 | 1,100 | 880
Dillon Lk | OH Muskingum | Licking R | F | 256.5 | 790.0 | 737.0 | 10,280 | 1,560 | PL 75-761.
FCR | 4.4 | 737.0 | 734.0 | 1,560 | 1,330
Dover Dam | OH Tuscarawas | Tuscarawas R | F | 203.0 | 916.0 | 858.0 | 10,100 | 0 | PW 1933.
E Br Clarion River Lake | PA Elk | E Br Clarion R | F | 19.0 | 1,685.0 | 1,670.0 | 1,370 | 1,160 | PL 78-526.
FCAR | 19.8 | 1,670.0 | 1,651.0 | 1,160 | 920
E Fk Res Wm H Harsha Lk | OH Clermont | E Fk Little Miami R | F | 202.2 | 795.0 | 733.0 | 4,600 | 2,160 | PL 75-761.
FMCAR | 73.6 | 733.0 | 683.0 | 2,160 | 820
East Lynn Lk | WV Wayne | E Fk Twelvepole | F | 65.3 | 701.0 | 662.0 | 2,351 | 1,005 | PL 75-761.
FCR | 5.5 | 662.0 | 656.0 | 1,005 | 823
Emsworth L&D | PA Allegheny | Ohio R | N | 0.0 | 710.0 | 692.0 | 0 | 0 | RHA 1909.
Fishtrap Lk | KY Pike | Levisa Fk | F | 126.7 | 825.0 | 757.0 | 2,681 | 1,131 | PL 75-761.
FCAR | 27.2 | 757.0 | 725.0 | 1,131 | 569
Gallipolis L&D | WV Mason | Ohio R | N | 0.0 | 538.0 | 515.0 | 0 | 0 | RHA 1935.
OH Gallia
Grayson Lk | KY Carter | L Sandy R | F | 89.6 | 681.0 | 645.0 | 3,633 | 1,509 | PL 86-645.
FCAR | 10.7 | 645.0 | 637.0 | 1,509 | 1,159
Green R L&D 1 | KY Henderson | Green R | N | 0.0 | 349.1 | 337.3 | 0 | 0 | RHA 1888.
Green R L&D 2 | KY McLean | Green R | N | 0.0 | 363.4 | 349.1 | 0 | 0 | RHA 1888.
Green River Lk | KY Taylor | Green R | F | 479.1 | 713.0 | 675.0 | 19,100 | 8,210 | PL 75-761.
FAR | 81.5 | 675.0 | 664.0 | 8,210 | 6,650
Greenup L&D 3 | KY Greenup | Ohio R | N | 0.0 | 515.0 | 485.0 | 0 | 0 | RHA 1909.
OH Scioto
Hannibal L&D | WV Wetzel | Ohio R | N | 0.0 | 623.0 | 602.0 | 0 | 0 | RHA 1909.
OH Monroe
Hildebrand L&D | WV Monongalia | Monongahela | N | 0.0 | 835.0 | 814.0 | 0 | 0 | RHA 1950.
Huntington Lk | IN Hunt | Wabash R | F | 140.6 | 798.0 | 749.0 | 7,900 | 900 | PL 85-500.
FR | 8.4 | 749.0 | 737.0 | 900 | 500
J Percy Priest Dam & Res | TN Davidson | Stones R | F | 252.0 | 504.5 | 490.5 | 22,720 | 14,400 | PL 75-761.
FP | 15.0 | 490.5 | 489.5 | 14,400 | 14,000
FPR | 0.0 | 489.5 | 483.0 | 14,000 | 11,630
PR | 0.0 | 483.0 | 480.0 | 11,630 | 10,570
JW Flannagan Dam & Res | VA Dickenson | Pound R | F | 78.6 | 1,446.0 | 1,396.0 | 2,098 | 1,143 | PL 75-761.
FMCR | 16.5 | 1,396.0 | 1,380.0 | 1,143 | 310
Kentucky R L&D 1 | KY Carroll | Kentucky R | N | 0.0 | 430.0 | 421.8 | 0 | 0 | RHA 1879.
Kentucky R L&D 2 | KY Henry Owen | Kentucky R | N | 0.0 | 444.0 | 430.0 | 0 | 0 | RHA 1879.
Kentucky R L&D 3 | KY Henry Owen | Kentucky R | N | 0.0 | 457.1 | 444.0 | 0 | 0 | RHA 1879.
Kentucky R L&D 4 | KY Franklin | Kentucky R | N | 0.0 | 470.4 | 457.1 | 0 | 0 | RHA 1879.
Laurel River Lk | KY Laurel, Whitley | Laurel R | P | 185.0 | 1,018.5 | 982.0 | 6,060 | 4,200 | PL 86-645.
R | 250.6 | 982.0 | 760.0 | 4,200 | 0
Leesvillie Lake | OH Carroll | McGuire Cr. | F | 17.9 | 977.5 | 963.0 | 1,470 | 1,000 | PW 1933.
FCR | 5.5 | 963.0 | 957.0 | 1,000 | 829
London L&D | WV Kanawha | Kanawha R | N | 0.0 | 614.0 | 590.0 | 0 | 0 | RHA 1930.
Loyalhanna Lk | PA Westmoreland | Loyalhanna Cr | F | 93.3 | 975.0 | 910.0 | 3,280 | 210 | PL 74-738.
FC | 0.0 | 0.0 | 0.0 | 0 | 0 | PL 75-761.
M J Kirwan Dam & Res | OH Portage | W. Br Mahoning R | F | 22.0 | 993.0 | 985.5 | 3,240 | 2,650 | PL-74-738
FCAR | 52.9 | 985.5 | 951.0 | 2,650 | 570 | PL 75-761.
Mahoning Cr Lk | PA Armstrong | Mahoning Cr | F | 64.7 | 1,162.0 | 1,098.0 | 2,370 | 280 | PL 74-738.
FRC | 5.1 | 1,098.0 | 1,075.0 | 280 | 170 | PL 75-761.
Markland L&D | IN Switzerland | Ohio R | N | 0.0 | 455.0 | 420.0 | 0 | 0 | RHA 1909
KY Gallatin
Marmet L&D | WV Kanawha R | Kanawha | N | 0.0 | 590.0 | 566.0 | 0 | 0 | RHA 1930.
Martins Fk Lk | KY Harlan | Martins Fk of Clover R | F | 14.3 | 1,341.0 | 1,310.0 | 578 | 340 | PL 89-298.
FAR | 3.1 | 1,310.0 | 1,300.0 | 340 | 274
R | 3.7 | 1,300.0 | 1,265.0 | 274 | 0
Maxwell L&D | PA Fayette Washington | Monongahela R | N | 0.0 | 763.0 | 743.5 | 0 | 0 | RHA 1909.
McAlpine L&D | KY Jefferson | Ohio R | N | 0.0 | 420.0 | 383.0 | 0 | 0 | RHA 1909.
IN Clark
Meldahl L&D | KY Bracken | Ohio R | N | 0.0 | 485.0 | 455.0 | 0 | 0 | RHA 1909.
OH Clermont
Mississinewa Lk | IN Miami | MIssissinewa R | F | 293.2 | 779.0 | 737.0 | 12,830 | 3,180 | PL 85-500.
FR | 51.9 | 737.0 | 712.0 | 3,180 | 1,280 | .
Mohawk Dam | OH Coshocton | Walhonding R | F | 285.0 | 890.0 | 799.2 | 7,950 | 0 | PW 1933.
Mohicanville Dam | OH Ashland | Lk Fork | F | 102.0 | 963.0 | 932.0 | 8,800 | 0 | PW 1933.
Monongahela R L&D 2 | PA Allegheny | Monongahela R | N | 0.0 | 718.7 | 710.0 | 0 | 0 | RHA 1902.
Monongahela R L&D 3 | PA Allegheny | Monongahela R | N | 0.0 | 726.9 | 718.7 | 0 | 0 | RHA 1905.
Monongahela R L&R 4 | PA Washington Westmoreland | Monongahela R | N | 0.0 | 743.5 | 726.9 | 0 | 0 | RHA 1909.
Monongahela R L&D 7 | PA Greene, Fayette | Monongahela R | N | 0.0 | 778.0 | 763.0 | 0 | 0 | RHA 1922.
Monongahela R L&D 8 | PA Greene, Fayette | Monongahela R | N | 0.0 | 797.0 | 778.0 | 0 | 0 | RHA 1922, 1950, 1973.
Monroe Lk | IN Monroe | Salt Cr | F | 258.8 | 556.0 | 538.0 | 18,450 | 10,750 | FCA 1958.
FMA | 159.9 | 538.0 | 515.0 | 10,750 | 3,280 | .
Montgomery Island L&D | PA Beaver | Ohio R | N | 0.0 | 682.0 | 664.5 | 0 | 0 | RHA 1909.
Morgantown L&D | WV Monongalia Monongahela R | N | 0.0 | 814.0 | 797.0 | 0 | 0 | RHA 1909.
Mosquito Cr Lk | OH Trumbull | Mosquito Cr | F | 21.7 | 904.0 | 901.4 | 8,900 | 7,850 | PL 75-761.
FMCAR | 80.4 | 901.4 | 899.9 | 7,850 | 7,220
N Br Kokosing River Lk | OH Knox | North Br of Kokosing R | F | 13.9 | 1,146.0 | 1,121.0 | 1,140 | 154 | PL 87-874.
N Fk Pound Lk | VA Wise | N Fk Pound R | F | 8.0 | 1,644.0 | 1,611.0 | 349 | 154 | PL 86-645.
FMCR | 1.3 | 1,611.0 | 1,601.0 | 154 | 106 | .
New Cumberland L&D | WV Hancock | Ohio R | N | 0.0 | 664.5 | 644.0 | 0 | 0 | RHA 1909.
OH Jefferson
Newburgh L&D | KY Henderson | Ohio R | N | 0.0 | 358.0 | 342.0 | 0 | 0 | RHA 1909.
IN Warrick
Nolin Lk | KY Edmonson | Nolin R | F | 439.2 | 560.0 | 515.0 | 14,530 | 5,790 | PL 75-761.
FR | 106.4 | 515.0 | 490.0 | 5,790 | 2,890
Ohio R L&D 52 | KY McCracken | Ohio R | N | 0.0 | 302.0 | 290.0 | 0 | 0 | RHA 1909, 1910, 1918.
IL Massac
Ohio R L&D 53 | KY Ballard | Ohio R | N | 0.0 | 290.0 | 276.6 | 0 | 0 | RHA 1909, 1910, 1918.
IL Pulaski
Old Hickory L&D | TN Davidson Sumner | Cumberland R | P | 63.0 | 445.0 | 442.0 | 22,500 | 19,550 | RHA 1946.
N | 357.0 | 442.0 | 375.0 | 19,550 | 0
Opekiska L&D | WV Monongahela | Monongahela R | N | 0.0 | 857.0 | 835.0 | 0 | 0 | RHA 1950.
Paint Cr Lk | OH Ross, Highland | Paint Cr | F | 124.7 | 845.0 | 798.0 | 4,761 | 1,190 | PL 75-761.
FMCAR | 11.4 | 798.0 | 787.5 | 1,190 | 770
Paintsville Lk | KY Johnson | Paint Cr | F | 32.8 | 731.0 | 709.0 | 1,867 | 1,139 | PL 89-298.
FCAR | 36.3 | 709.0 | 650.0 | 1,139 | 261
Patoka Lk | IN DuBois | Patoka R | F | 121.1 | 548.0 | 536.0 | 11,300 | 8,880 | PL 89-298.
FMCAR | 167.3 | 536.0 | 506.0 | 8,880 | 2,010
Piedmont Lk | OH Harrison | Stillwater Cr | F | 32.2 | 924.6 | 913.0 | 3,170 | 2,310 | PW 1933.
FCR | 8.6 | 913.0 | 909.0 | 2,310 | 1,987
Pike Island L&D | WV Ohio | Ohio R | N | 0.0 | 644.0 | 623.0 | 0 | 0 | RHA 1909.
OH Belmont
Pleasant Hill Lk | OH Ashland | Clear Fk | F | 74.2 | 1,065.0 | 1,020.0 | 2,600 | 850 | PW 1933.
FCR | 5.5 | 1,020.0 | 1,012.5 | 850 | 627
R D Bailey Lk | WV Mingo, Wyoming | Guyandot R | F | 169.5 | 1,155.0 | 1,035.0 | 2,850 | 630 | PL 87-874.
FCAR | 12.2 | 1,035.0 | 1,012.0 | 630 | 440
Racine L&D | WV Mason | Ohio R | N | 0.0 | 560.0 | 538.0 | 0 | 0 | RHA 1909.
OH Meigs
Rough River Lk | Grayson, Breckinridge | Rough R | F | 214.4 | 524.0 | 495.0 | 10,260 | 5,100 | PL 75-761.
Ridge | FMR | 90.2 | 495.0 | 470.0 | 5,100 | 2,180
Salamonie Lk | IN Wabash | Salamonie R | F | 202.9 | 793.0 | 755.0 | 9,340 | 2,860 | PL 85-500.
FR | 47.6 | 755.0 | 730.0 | 2,860 | 976
Senecaville Lk | OH Guernsey | Seneca Fk | F | 45.1 | 842.5 | 832.2 | 5,170 | 3,550 | PW 1933.
FCR | 12.8 | 832.2 | 828.2 | 3,550 | 2,912
Shenango River Lk | PA Mercer | Shenango R | F | 151.0 | 919.0 | 896.0 | 11,090 | 3,560 | PL 75-761.
FCAR | 29.9 | 896.0 | 885.0 | 3,560 | 1,910
Smithland L&D | KY Livingston | Ohio R | N | 0.0 | 324.0 | 302.0 | 0 | 0 | RHA 1909.
IL Pope
Summersville Lk | WV Nicholas | Gauley R | F | 221.9 | 1,710.0 | 1,1652.0 | 4,913 | 2,790 | PL 75-761.
FRCA | 161.8 | 1,652.0 | 1,535.0 | 2,790 | 514
Sutton Lk | WV Braxton | Elk R | FCAR | 60.0 | 925.0 | 850.0 | 1,520 | 270 | PL 75-761.
Tappan Lk | OH Harrison | L Stillwater Cr | F | 26.5 | 909.0 | 899.3 | 3,100 | 2,350 | PW 1933.
FCR | 11.4 | 899.3 | 894.0 | 2,350 | 1,960
Tionesta Lk | PA Forest | Tionesta Cr | F | 125.6 | 1,170.0 | 1,085.0 | 2,770 | 480 | PL 74-738. PL 75-761.
Tom Jenkins Dam, Burr Oak, Lk | OH Athens | E Br Sandy Cr | F | 17.6 | 740.0 | 721.0 | 1,192 | 664 | FCA 1944.
FRM | 5.8 | 721.0 | 710.0 | 664 | 394 | PL 78-534.
Tygart Lake | WV Taylor | Tygart R | F | 178.1 | 1,167.0 | 1,094.0 | 3,430 | 1,740 | PWA 1934.
FMACR | 99.9 | 1,094.0 | 1,010.0 | 1,740 | 620
Union City Res | PA Erie | French Cr | F | 47.6 | 1,278.0 | 1,210.0 | 2,290 | 0 | PL 87-874.
Uniontown L&D | KY Union | Ohio R | N | 0.0 | 342.0 | 324.0 | 0 | 0 | RHA 1909.
IN Posey
W FK of Mill Cr Winton Woods Lk | OH Hamilton | W Fk Mill Cr | F | 9.8 | 702.0 | 675.0 | 557 | 183 | PL 79-526.
Willow Island L&D | WV Pleasants | Ohio R | N | 0.0 | 602.0 | 582.0 | 0 | 0 | RHA 1909.
OH Washington
Wills Cr Lk | OH Coshockton Wills Cr, Muskingum | F | 190.0 | 779.0 | 742.0 | 11,450 | 900 | PW 1933.
CR | 0.0 | 0.0 | 0.0 | 0 | 0
Winfield L&D | WV Putnam | Kanawha R | N | 0.0 | 566.0 | 538.0 | 0 | 0 | RHA 1935.
Wolf Cr Dam, Lk Cumberland | KY Russell | Cumberland R | P | 2,142.0 | 723.0 | 673.0 | 50,250 | 35,820
F | 2,094.0 | 760.0 | 723.0 | 63,530 | 50,250 | PL 75-761.
Woodcock Cr Lk | PA Crawford | Woodcock Cr | F | 15.0 | 1,209.0 | 1,181.0 | 775 | 325 | FCA 1962.
FCAR | 5.0 | 1,181.0 | 1,162.5 | 325 | 100
Youghiogheny R Lk | PA Fayette | Youghiogheny R | F | 99.5 | 1,470.0 | 1,439.0 | 3,570 | 2,840 | FCA 1938.
FCAR | 149.3 | 1,439.0 | 1,419.0 | 2,840 | 2,300
South Atlantic Division
Aberdeen L&D and Res | MS Monroe | Tombigbee R | N | 3.9 | 190.5 | 189.5 | 4,359 | 3,883 | PL 79-525.
Aliceville Lock Dam & Res | AL Pickens | Tombigbee R | N | 7.6 | 136.5 | 135.5 | 8,655 | 7,945 | PL 79-525.
Allatoona Dam & Res | GA Bartow | Etowah R | F | 302.6 | 860.0 | 840.0 | 19,201 | 11,862 | PL 77-228.
PMAR | 284.6 | 840.0 | 800.0 | 11,862 | 3,251
B Everett Jordan Dam & Lk | NC Chatham | Haw R | F | 538.4 | 240.0 | 216.0 | 31,811 | 13,942 | PL 88-253.
FMCAR | 140.4 | 216.0 | 202.0 | 13,942 | 6,658
Bay Springs Lock Dam & Res | MS Tishomingo | Tombigbee R | N | 37.0 | 414.0 | 408.0 | 6,700 | 5,740 | PL 79-525.
Buford Dam Lk, Sidney Lanier | GA Forsyth, Gwinnett | Chattahoochee R | F PNMR | 598.8 1,087.6 | 1,085.0 1,071.0 | 1,071.0 1,035.0 | 47,182 38,542 | 38,542 22,442 | PL 79-14.
Carters Dam & Res | GA Murray | Coosawattee R | F | 89.2 | 1,099.0 | 1,074.0 | 3,880 | 3,275 | PL 79-14.
PRA | 41.4 | 1,074.0 | 1,022.0 | 3,275 | 2,196
Claiborne Lock Dam & Res | AL Monroe | Alabama R | N | 16.6 | 35.0 | 32.0 | 5,930 | 5,210 | PL 79-14.
Clarks Hill Dam & Lk | GA Columbia | Savannah R | F | 390.0 | 335.0 | 330.0 | 78,500 | 71,100 | PL 78-534.
SC McCormick | FP | 1,045.0 | 330.0 | 312.0 | 71,100 | 45,000
Coffeeville Lock Dam & Res | AL Clark, Choctaw | Tombigbee R | N | 19.9 | 32.5 | 30.0 | 8,500 | 7,500 | PL 60-317.
Columbus Lock Dam & Res | MS Lowndes | Tombigbee R | N | 8.5 | 163.5 | 162.5 | 9,400 | 8,500 | PL 79-525.
Demopolis Lock Dam & Res | AL Sumter, Marengo | Tombigbee R | N | 0.0 | 73.0 | 73.0 | 10,000 | 10,000 | PL 60-317.
Falls Dam & Lk | NC Wake | Neuse R | F | 220.9 | 264.0 | 250.1 | 20,810 | 11,310 | PL 89-298.
FMCAR | 89.7 | 250.1 | 236.5 | 11,310 | 2,600
G W Andrews L&D and Res | AL Houston | Chattahoochee R | N | 8.2 | 102.0 | 96.0 | 1,540 | 1,190 | PL 79-14.
GA Early
Gainesville L&D and Res | AL Sumter, Greene | Tombigbee R | N | 5.8 | 109.5 | 108.5 | 6,920 | 5,900 | PL 79-525.
Hartwell Dam & Lk | GA Hart | Savannah R | F | 293.0 | 665.0 | 660.0 | 61,400 | 55,950 | PL 81-516.
SC Anderson | FP | 1,416.0 | 660.0 | 625.0 | 55,950 | 27,650
Holt Lock Dam & Res | AL Tuscaloosa | Black-Warrior R | NP | 3.3 | 187.0 | 186.0 | 3,296 | 3,252 | PL 60-317.
Inglis Dam Lk Rousseau | FL Levy, Marion, Citrus | Cross FL Barge Canal | N | 13.0 | 27.5 | 24.0 | 4,030 | 2,040 | PL 77-675.
Jim Woodruf L&D | FL Gadsden, Jackson | Apalachicola R | NP | 20.0 | 77.5 | 76.5 | 38,850 | 36,000 | PL 79-14.
John H Kerr Dam & Res | VA Mecklenburg | Roanoke R | F | 1,281.4 | 320.0 | 300.0 | 83,200 | 48,900 | PL 78-534.
FP | 1,027.0 | 300.0 | 268.0 | 48,900 | 19,700
John Hollis Bankhead L&D and Res | AL Tuscaloosa | Black-Warrior R | NP | 27.1 | 255.0 | 252.0 | 9,245 | 8,730 | PL 60-168.
Lk Okeechobee | FL Okeechobee, Glades, Hendry, Palm Beach, Martin | Central and Southern FL | FNIMC | 2,859.0 | 17.5 | 10.5 | 454,900 | 326,000 | PL 71-520, PL 75-392, PL 79-14, PL 80-858, PL 83-780, PL 90.
Lock A | MS Monroe | Tombigbee R | N | 0.9 | 220.5 | 219.5 | 980 | 850 | PL 79-525.
Lock B | MS Monroe | Tombigbee R | N | 2.7 | 245.5 | 244.5 | 2,841 | 2,615 | PL 79-525.
Lock C | MS Itawamba | Tombigbee R | N | 1.6 | 270.5 | 269.5 | 1,699 | 1,586 | PL 79-525.
Lock D | MS Itawamba | Tombigbee R | N | 2.0 | 300.5 | 299.5 | 2,021 | 1,959 | PL 79-525.
Lock E | MS Itawamba, Prentiss | Tombigbee R | N | 0.9 | 330.5 | 329.5 | 889 | 821 | PL 79-525.
Millers Ferry L&D | AL Wilcox | Alabama R | NP | 16.7 | 80.0 | 79.0 | 17,201 | 16,160 | PL 79-14.
Okatibbee Dam & Res | MS Lauderdale | Okatibbee Cr | F | 46.5 | 352.0 | 343.0 | 6,580 | 3,800 | PL 87-874.
Chickasawbay R | RMA | 34.3 | 343.0 | 328.0 | 3,800 | 1,275
Philpott Dam & Lk | VA Henry | Smith R | F | 34.2 | 985.0 | 974.0 | 3,370 | 2,880 | PL 78-534.
FP | 111.2 | 974.0 | 920.0 | 2,880 | 1,350
R B Russell Dam and Lk | GA Elbert | Savannah R | F | 140.0 | 480.0 | 475.0 | 29,340 | 26,653 | PL 89-789.
SC Abbeville | FP | 126.8 | 475.0 | 470.0 | 26,653 | 24,117
Robert F Henry Lock Dam & Res | AL Autauga, Lowndes | Alabama R | NP | 44.6 | 125.0 | 124.0 | 13,300 | 10,470 | PL 79-14.
Rodman Dam & Lk Ocklawaha | FL Putman & Marion | Cross FL Barge Canal | N | 48.0 | 23.2 | 20.0 | 17,350 | 12,950 | PL 77-675.
S-10 & Water Cons Area 1 | FL Palm Beach | Central and Southern FL | F | 181.9 | 18.3 | 17.0 | 141,250 | 141,250 | PL 80-858.
FIMC | 273.2 | 17.0 | 14.0 | 141,250 | 26,00
S-11 & Water Cons Area 2A | FL Palm Beach Broward | Central and Southern FL | F | 236.3 | 16.6 | 14.5 | 110,500 | 110,500 | PL 80-858.
FIMC | 165.0 | 14.5 | 13.0 | 110,500 | 107,500 | PL 83-780.
S-12 & Water Cons Area 3A | FL Broward & Dade | Central and Southern FL | F | 1,661.0 | 14.5 | 10.5 | 487,200 | 385,000 | PL 80-858.
FIMC | 465.0 | 10.5 | 9.5 | 385,000 | 316,000 | PL 83-780.
Selden Lock and Res | AL Hale, Greene | Black-Warrior R | N | 9.1 | 95.5 | 94.0 | 8,200 | 6,900 | PL 60-317.
W Kerr Scott Dam & Res | NC Wilkes | Yadkin R | F | 112.0 | 1,075.0 | 1,030.0 | 4,000 | 1,475 | PL 79-526.
FM | 33.0 | 1,030.0 | 1,000.0 | 1,475 | 675
Walter F George L&D | GA Clay | Chattahoochee R | NP | 244.0 | 190.0 | 184.0 | 45,181 | 36,375 | PL 81-516.
AL Henry
West Point Dam & Res | GA Troup | Chattahoochee R | NPMAR | 306.1 | 635.0 | 620.0 | 25,864 | 15,512 | PL 87-874.
William Bacon Oliver L&D and Res | AL Tuscaloosa | Black Warrior R | N | 0 | 122.9 | 122.9 | 790 | 790 | PL 60-317.
South Pacific Division
Alamo Dam & Lk | AZ Mohave, Yuma | Bill Williams R | F | 1,046.2 | 1,235.0 | 1,174.0 | 13,307 | 7,045 | PL 78-534.
Bear Dam | CA Mariposa | Bear Cr | F | 7.7 | 413.5 | 344.0 | 265 | 0 | PL 78-534.
Black Butte Lk | CA Tehama | Stony Cr | FI | 137.1 | 473.5 | 414.6 | 4,453 | 577 | PL 78-534.
Brea Dam & Res | CA Orange | Brea Cr | F | 4.0 | 279.0 | 208.0 | 163 | 0 | FCA 1936.
Buchanan Dam H.V. Eastman Lk | CA Madera | Chowchilla R | F | 45.0 | 587.0 | 559.0 | 1,785 | 1,482 | PL 78-874.
FI | 140.0 | 587.0 | 466.0 | 1,785 | 484
Burns Dam | CA Merced | Burns Cr | F | 6.8 | 300.0 | 266.0 | 662 | 0 | PL 78-534.
Carbon Canyon Dam & Res | CA Orange | Carbon Cr | F | 6.6 | 475.0 | 403.0 | 225 | 0 | PL 74-738.
Coyote Valley Dam Lk Mendocino | CA Mendocino | East Fork, Russian R | F | 50.1 | 764.8 | 737.5 | 1,922 | 1,740 | PL 75-761.
IM | 72.3 | 737.5 | 637.0 | 1,740 | 20
Dry Cr (Warm Springs) Lk & Channel | CA Sonoma | Dry Cr | F | 136.0 | 495.0 | 451.1 | 3,600 | 2,600 | PL 87-874.
MR | 225.0 | 451.1 | 291.0 | 2,600 | 500
Farmington Dam | CA San Joaquin, Stanislaus | Littlejohn Cr | F | 52.0 | 156.5 | 120.0 | 4,107 | 0 | PL 78-534.
Fullerton Dam & Res | CA Orange | Fullerton Cr | F | 0.8 | 290.0 | 261.0 | 62 | 0 | FCA 1936.
Hansen Dam Res | CA Los Angeles | Tujunga Wash | F | 25.4 | 1,060.0 | 990.0 | 781 | 0 | FCA 1936.
Hidden Dam Hensley Lk | CA Madera | Fresno R | F | 65.0 | 540.0 | 485.8 | 1,567 | 811 | PL 87-874.
FI | 85.0 | 540.0 | 448.0 | 1,567 | 280
Isabella Lk | CA Kern | Kern R | FI | 568.1 | 2,605.5 | 2,470.0 | 11,454 | 26 | PL 785-34.
Lopez Dam Res | CA Los Angeles | Pocoima Wash | F | 0.4 | 1,272.9 | 1,253.7 | 40 | 0 | FCA 1936.
Mariposa Dam | CA Mariposa | Mariposa Cr | F | 15.0 | 439.5 | 370.0 | 512 | 0 | PL 78-534.
Martis Cr Lk | CA Nevada | Martis Cr | F | 19.6 | 5,838.0 | 5,780.0 | 762 | 61 | PL 87-874.
Mathews Canyon Dam & Res | NV Lincoln | Mathews Canyon | F | 6.3 | 5,461.0 | 5,420.0 | 300 | 0 | PL 81-516.
Mojave River Dam & Res | CA San Bernardino | Mojave R | F | 89.7 | 3,134.0 | 2,988.0 | 1,978 | 0 | PL 86-645.
New Hogan Lk | CA Calaveras | Calaveras R | F | 165.0 | 713.0 | 666.2 | 4,333 | 2,818 | PL 78-534.
FI | 302.2 | 713.0 | 586.0 | 4,333 | 702
Owens Dam | CA Mariposa | Owens Cr | F | 3.6 | 407.5 | 347.0 | 174 | 0 | PL 78-534.
Painted Roc Dam & Res | AZ Maricopa | Gila R | F | 2,491.5 | 661.0 | 524.0 | 53,200 | 0 | PL 81-516.
Pine Canyon Dam & Res | NV Lincoln | Pine Canyon | F | 7.8 | 5,675.0 | 5,604.0 | 254 | 0 | PL 81-516.
Pine Flat Lk Kings R | CA Fresno | Kings R | F | 1,000.0 | 951.5 | 565.5 | 5,956 | 0 | PL 78-534.
Prado Dam & Res | CA Riverside | Santa Ana R | F | 196.2 | 543.0 | 460.0 | 6,630 | 0 | FCA 1936.
San Antonio Dam & Res | CA Los Angeles | San Antonio Cr | F | 7.7 | 2,238.0 | 2,125.0 | 145 | 0 | FCA 1936.
Santa Fe Dam & Res | CA Los Angeles | San Gabriel R | F | 32.1 | 496.0 | 421.0 | 1,084 | 0 | FCA 1936, 1941.
Sepolveda Dam & Res | CA Los Angeles | Los Angeles R | F | 17.4 | 710.0 | 668.0 | 1,335 | 0 | FCA 1936.
Success Lk | CA Tulare | Tule R | FI | 75.0 | 652.5 | 588.9 | 2,477 | 409 | PL 78-534.
Terminus Dam Lk Kaweah | CA Tulare | Kaweah R | FI | 136.1 | 694.0 | 570.0 | 1,913 | 276 | PL 78-534.
Whitlow Ranch Dam & Res | AZ Pinal | Queen Cr | F | 35.6 | 2,166.0 | 2,056.0 | 828 | 0 | PL 79-526.
Whittler Marrows Dam & Res | CA Los Angeles | San Gabriel Rio Hondo R | F | 34.9 | 228.5 | 184.0 | 2,411 | 0 | FCA 1936.
Southwestern Division
Abiquiu Dam | NM Rio Arriba | Rio Chama | F | 572.2 | 6,283.5 | 6,220.0 | 7,469 | 4,120 | PL 80-858.
FM | 191.3 | 6,220.0 | 6,060.0 | 4,120 | 0
Addicks Res | TX Harris | Buffalo Bayou | F | 200.8 | 112.0 | 71.1 | 16,423 | 0 | HD250-83-2.
Aquilla Lk | TX Hill | Aquilla Cr | F | 161.4 | 564.5 | 537.5 | 8,980 | 3,280 | PL 90-483.
MR | 93.6 | 537.5 | 478.6 | 3,280 | 26
Arcadia Lk | OK Oklahoma | Deep Fork R | F | 64.4 | 1,029.5 | 1,006.0 | 3,820 | 1,820 | PL 91-611.
FMCR | 27.4 | 1,006.0 | 970.0 | 1,820 | 20
B A Steinhagen Lk | TX Taylor, Jasper | Neches R | F | 24.5 | 83.0 | 81.0 | 13,700 | 10,950 | SD98-76-1.
Bardwell Lk | TX Ellis | Waxahachie Cr | F | 79.6 | 439.0 | 421.0 | 6,040 | 3,570 | PL 86-399.
M | 42.8 | 421.0 | 372.6 | 3,570 | 0
Barker Res | TX Harris Ft Bend | Buffalo Bayou | F | 209.0 | 106.0 | 73.2 | 16,734 | 0 | HD250-83-2, RHA 1938.
Beaver Lk | AR Carrol, Benton, Washington | White R | F | 299.6 | 1,130.0 | 1,120.0 | 31,700 | 28,220 | PL 83-780.
FPM | 925.1 | 1,120.0 | 1,077.0 | 28,220 | 15,540 | PL 85-500.
Belton Lk | TX Bell | Leon R | F | 640.0 | 631.0 | 594.0 | 23,600 | 12,400 | PL 79-526.
MI | 372.7 | 594.0 | 470.0 | 12,400 | 42 | HD88-81-1.
Benbrook Lk | TX Tarrant, Parker | Clear Fk Trinity R | F | 170.4 | 724.0 | 694.0 | 7,630 | 3,770 | HD103-771.
NM | 72.5 | 694.0 | 656.0 | 3,770 | 730
Big Hill LK | KN Labette | Big HIll Cr | F | 13.1 | 867.5 | 858.0 | 1,520 | 1,240 | PL 87-874.
FMR | 27.2 | 858.0 | 814.0 | 1,240 | 70 | HD572-87-2.
Birch Lk | OK Osage | Birch Cr | F | 39.0 | 774.0 | 750.5 | 2,340 | 1,140 | PL 87-874.
FMCAR | 15.8 | 750.5 | 730.0 | 1,140 | 384 | HD563-87-2.
Blue Mountain Lk | AR Yell, Logan | Petit Jean R | F | 233.3 | 419.0 | 384.0 | 11,000 | 2,910 | PA 75-761.
Broken Bow Lk | OK McCurtain | Mountain Fk R | F | 450.2 | 627.5 | 599.5 | 18,000 | 14,200 | PL 85-500.
FRPMAC | 469.8 | 599.5 | 559.5 | 14,200 | 9,200
Bull Shoals Lk | AR Baxter, Marion, Boone | White R | F | 2,360.0 | 695.0 | 654.0 | 71,240 | 45,440 | PL 77-228.
MO Ozark, Taney | PF | 1,003.0 | 654.0 | 628.5 | 45,440 | 33,800
Canton Lk | OK Blain | N Canadian R | F | 265.8 | 1,638.0 | 1,615.4 | 15,710 | 7,910 | PL 75-761.
FMI | 97.2 | 1,615.4 | 1,596.5 | 7,910 | 2,710 | HD56-/75-3.
Canyon Lk | TX Comal | Guadalupe R | F | 346.4 | 934.0 | 909.0 | 12,890 | 8,240 | PL 79-14.
M | 366.4 | 909.0 | 75.0 | 8,240 | 0
Clearwater Lk | MO Reynolds, Wayne | Black R | F | 391.8 | 567.0 | 494.0 | 10,400 | 1,630 | PL 75-761.
Cochiti Lk | NM Sandoval, Sante Fe, Los Alamos | Rio Grande | F | 545.0 | 5,460.5 | 5,356.6 | 9,361 | 1,200 | PL 86-645.
FRC | 43.0 | 5,356.6 | 5,330.0 | 1,200 | 0
Conchas Lk | NM San Miguel | Candian R | F | 198.8 | 4,218.0 | 4,201.0 | 13,664 | 9,692 | HD 308-74.
FI | 259.6 | 4,201.0 | 4,155.0 | 9,692 | 3,000
Copan Lk | OK Washington | L Caney R | F | 184.3 | 732.0 | 710.0 | 13,380 | 4,850 | PL 87-874.
KS Chautauqua | FMCA | 42.8 | 710.0 | 687.5 | 4,850 | 110 | HD563-87-2.
Council Grove Lk | KS Morris | Neosho R | F | 63.8 | 1,289.0 | 1,274.0 | 5,400 | 3,230 | PL 81-516.
FMAR | 48.5 | 1,274.0 | 1,240.0 | 3,230 | 42
DeQueen Lk | AR Sevier | Rolling Fork R | F | 101.3 | 473.5 | 437.0 | 4,050 | 1,680 | PL 85-500.
FMCRQ | 25.5 | 437.0 | 415.0 | 1,680 | 710
Dierks Lk | AR Sevier, Howard | Saline R | F | 67.1 | 557.5 | 526.0 | 2,970 | 1,360 | PL 85-500.
FMCR | 15.1 | 526.0 | 512.0 | 1,360 | 810
Eldorado Lk | KS Butler | Walnut R | F | 79.2 | 1,347.5 | 1,339.0 | 10,740 | 8,000 | PL 89-298.
FMAR | 154.0 | 1,339.0 | 1,296.0 | 8,000 | 420 | HD232-89-1.
Elk City Lk | KS Montgomery | Elk R | F | 239.5 | 825.0 | 796.0 | 13,150 | 4,450 | HD440-76-1.
FMA | 44.8 | 796.0 | 764.0 | 4,450 | 64
Eufaula Lk | OK McIntosh, Pittsburg, Haskell | Candian R | F | 1,510.9 | 597.0 | 585.0 | 147,960 | 105,480 | PL 79-525.
FNPM | 1,463.0 | 585.0 | 565.0 | 105,480 | 46,120
Fall River Lk | KS Greenwood | Fall R | F | 234.5 | 987.5 | 948.5 | 10,400 | 2,350 | HD440-76-1.
FA | 15.0 | 948.5 | 940.0 | 2,350 | 1,170
Fort Gibson Lk | OK Wagoner | Neosho (Grand) R | F | 919.2 | 582.0 | 554.0 | 51,000 | 19,900 | FEC 1941.
FP | 53.9 | 554.0 | 551.0 | 19,100 | 16,950 | RHA 1946.
Fort Supply Lk | OK Woodward | Wolf Cr | F | 86.8 | 2,028.0 | 2,004.0 | 5,690 | 1,820 | PL 74-738.
FM | 13.9 | 2,004.0 | 1,988.0 | 1,820 | 0
Galisteo Dam | NM Santa Fe | Galisteo Cr | F | 79.4 | 5,608.0 | 5,496.0 | 2,060 | 0 | PL 86-645.
Georgetown Lk | TX Williamson | N.F. San Gabriel R | F | 87.6 | 834.0 | 791.0 | 3,220 | 1,310 | PL 87-874.
MC | 29.2 | 791.0 | 699.0 | 1,310 | 0 | HD 591-82-2.
Gillham Lk | AR Howard, Polk | Cossatot R | F | 188.7 | 569.0 | 502.0 | 4,680 | 1,370 | PL 85-500.
FMCQ | 29.3 | 502.0 | 464.5 | 1,370 | 310
Granger Lk | TX Williamson | San Gabriel R | F | 162.2 | 528.0 | 504.0 | 11,040 | 4,400 | PL 87-874.
M | 37.9 | 504.0 | 440.0 | 4,400 | 0
Grapevine Lk | TX Denton, Tarrant | Denton Cr | F | 243.1 | 560.0 | 535.0 | 12,710 | 7,280 | HD103-77-1.
M | 154.3 | 535.0 | 451.0 | 7,380 | 41
Great Salt Plains Lk | OK Alfalfa | Salt Fk | F | 240.0 | 1,138.5 | 1,125.0 | 27,730 | 8,693 | PL 74-738.
Arkansas R | FC | 31.4 | 1,125.0 | 1,115.0 | 8,690 | 0
Greers Ferry Lk | AR Cleburne, Van Buren | Little Red R | F | 934.0 | 487.0 | 461.0 | 40,480 | 31,460 | PL 75-761.
FP | 716.5 | 461.0 | 435.0 | 31,460 | 23,740 | PL 83-780.
Heyburn Lk | OK Creek | Polecat Cr | F | 48.4 | 784.0 | 761.5 | 3,700 | 917 | PL 79-526.
FM | 3.8 | 761.5 | 55.5 | 917 | 394
Hords Cr Lk | TX Coleman | Hords Cr | F | 16.7 | 1,920.0 | 1,900.0 | 1,260 | 510 | PL 77-228.
M | 5.8 | 1,900.0 | 1,848.0 | 510 | 0
Hugo Lk | OK Choctaw | Kiamichi R | F | 809.1 | 437.5 | 404.5 | 34,490 | 13,250 | PL 79-526.
FMCAR | 127.2 | 404.5 | 390.0 | 13,250 | 4,500
Hulah Lk | OK Osage | Caney R | F | 257.9 | 765.0 | 733.0 | 13,000 | 3,570 | PL 74-738.
KS Chautaugua | FMA | 31.1 | 733.0 | 710.0 | 3,570 | 0 | PL 84-843.
Jemez Canyon Dam | NM Sandoval | Jemez R | F | 73.0 | 5,232.0 | 5,196.1 | 2,877 | 1,370 | PL 80-858 PL 81-516.
Joe Pool Lk | TX Dalla, Ellis, Tarrant | Mountain Cr | F | 1,238.0 | 536.0 | 522.0 | 10,940 | 7,470 | PL 89-298.
M | 176.9 | 522.0 | 456.0 | 7,470 | 10
John Martin Res | CO Bent | Arkansas R | F | 270.3 | 3,870.0 | 3,851.0 | 17,630 | 11,655 | PL 74-738.
FRC | 350.9 | 3,851.0 | 0.0 | 11,655 | 0
John Redmond Dam & Res | KS Coffee | Neosho R | F | 559.0 | 1,068.0 | 1,039.0 | 31,700 | 9,300 | PL 81-516.
FMAR | 70.8 | 1,039.0 | 1,020.0 | 9,300 | 108
Kaw Lk | OK Kay, Osage | Arkansas R | F | 919.4 | 1,044.5 | 1,010.0 | 38,020 | 17,040 | PL 87-874.
KS Cowley | FMARC | 343.5 | 1,010.0 | 978.0 | 17,040 | 5,590
Keystone Lk | OK Tulsa | Arkansas R | F | 1,180.0 | 754.0 | 723.0 | 54,300 | 23,600 | PL 81-516.
FNPMC | 296.7 | 723.0 | 706.0 | 23,600 | 13,300
L&D 01, Norrell | AR Arkansas | Arkansas Post Canal | N | 0.0 | 142.0 | 142.0 | 140 | 140 | HD 758-79, RHA 1946.
L&D 02, Wilbur D. Mills Dam | AR Desha, Arkansas | Arkansas R | N | 18.7 | 162.3 | 160.5 | 10,700 | 9,400 | HD 758-79, RHA 1946.
L&D 03 | AR Jefferson, Lincoln | Arkansas R | N | 8.3 | 182.3 | 180.0 | 3,750 | 3,180 | HD 758-79, RHA 1946.
L&D 04 | AR Jefferson | Arkansas R | N | 12.9 | 196.3 | 194.0 | 5,820 | 5,200 | HD 758-79, RHA 1946.
L&D 05 | AR Jefferson | Arkansas R | N | 14.4 | 213.3 | 211.0 | 6,900 | 5,550 | HD 758-79, RHA 1946.
L&D 06, David D. Terry | AR Pulaski | Arkansas R | N | 9.6 | 231.3 | 229.0 | 4,830 | 4,130 | HD 758-79.
L&D 07, Murray | AR Pulaski | Arkansas R | N | 24.7 | 249.7 | 247.0 | 10,350 | 8,100 | RHA 1946.
L&D 08, Toad Suck Ferry | AR Faulkner, Perry | Arkansas R | N | 8.7 | 265.3 | 263.0 | 4,130 | 3,600 | RHA 1946.
L&D 09, Arthur V. Ormond L&D, W. Rockefeller Lk | AR Conway | Arkansas R | N | 15.8 | 287.0 | 284.0 | 5,660 | 4,910 | HD 758-79.
L&D 10, Lk Dardanelle | AR Pope Yell | Arkansas R | NP | 72.3 | 338.2 | 336.0 | 34,700 | 31,140 | HD 758-79, RHA 1946.
L&D 11, Ozark-Jetta Taylor | AR Franklin | Arkansas | NPR | 25.3 | 372.5 | 370.0 | 11,100 | 8,800 | RHA 1946, HD 758-79.
L&D 13, James W. Trimble | AR Sebastian, Crawford | Arkansas R | N | 18.1 | 392.0 | 389.0 | 6,820 | 5,200 | RHA 1946.
L&D 14, W. D. Mayo | OK Sequoyah, Leflore | Arkansas R | N | 0.0 | 413.0 | 0.0 | 1,600 | 0 | PL 79-525.
L&D 15, Robert S. Kerr Res | OK Leflore, Sequoyah | Arkansas R | NP | 84.7 | 460.0 | 458.0 | 43,800 | 40,760 | PL 79-525.
L&D 16, Webbers Falls Res | OK Muskogee | Arkansas R | NP | 32.4 | 490.0 | 487.0 | 10,900 | 9,300 | PL 79-525.
L&D 17, Chouteau | OK Wagoner | Verdigris R | N | 0.0 | 511.0 | 511.0 | 2,270 | 2,270 | PL 79-525, HD 758-79-2.
L&D 18, Newt Graham | OK Wagoner | Verdigris R | N | 0.0 | 532.0 | 532.0 | 1,490 | 1,490 | PL 97-525.
Lake O' The Pines | TX Marion | Cypress Cr | F | 579.5 | 249.5 | 228.5 | 38,200 | 18,700 | PL 79-526.
M | 250.0 | 228.5 | 201.0 | 18,700 | 1,100
Lavon Lk | TX Collin | East Fork, Trinity R | F M | 275.6 380.0 | 503.5 492.0 | 492.0 433.0 | 29,450 21,400 | 21,400 2,87 | HD 533-78-2.
Lewisville Lk Garza-Little Elm Dam | TX Denton | Elm Fork Trinity R | F | 525.2 | 532.0 | 515.0 | 39,080 | 23,280 | HD 403-77-1.
M | 436.0 | 515.0 | 433.0 | 23,280 | 12
Marion Lk | KS Marion | Cottonwood R | F | 60.2 | 1,358.5 | 1,350.5 | 9,050 | 6,200 | PL 81-516.
FMAR | 83.3 | 1,350.5 | 1,320.0 | 6,200 | 170
Millwood Lk | AR Little R Hempstead | Little R | F | 1,650.0 | 287.0 | 259.2 | 95,200 | 29,200 | PL 79-526.
FMC | 153.3 | 259.2 | 252.0 | 29,200 | 13,100 | HD 785-79.
Navarro Mills Lk | TX Navarro Hill | Richland Cr | F | 143.2 | 443.0 | 424.5 | 11,700 | 5,070 | HD 498-83-2.
M | 53.2 | 424.5 | 375.3 | 5,070 | 0
Nimrod Lk | AR Perry, Yell | Fourche La Fave R | F | 307.0 | 373.0 | 342.0 | 18,300 | 3,550 | FCA 1938.
Norfork Lk | AR Baxter, Fulton | North Fork R | F | 731.8 | 580.0 | 552.0 | 30,700 | 21,990 | PL 75-761.
MO Ozark | FP | 707.0 | 552.0 | 510.0 | 21.990 | 12,320 | FCA 1941
North Fork Lk | TX Williamson | N.F. San Gabriel R | F | 87.6 | 834.0 | 791.0 | 3,220 | 1,310 | PL 87-874.
MC | 29.2 | 791.0 | 699.0 | 1,310 | 0 | HD 591-82-2.
O. C. Fisher Lk | TX Tom Green | N. Concho R | F | 277.2 | 1,938.5 | 1,908.0 | 12,700 | 5,440 | PL 77-228.
M | 80.4 | 1,908.0 | 1,836.0 | 5,440 | 3
Oologah Lk | OK Rogers | Verdigris R | F | 965.6 | 661.0 | 638.0 | 56,800 | 29,460 | PL 75-761.
FMN | 544.1 | 638.0 | 592.0 | 29,460 | 1,120
Optima Lk | OK Texas | N. Candian R | F | 100.5 | 2,779.0 | 2,763.5 | 7,640 | 5,340 | PL 74-738.
FMRC | 117.7 | 2,763.5 | 2,726.0 | 5,340 | 1,335
Pat Mayse Lk | TX Lamar | Sanders Cr | F | 64.6 | 460.5 | 451.0 | 7,680 | 5,993 | PL 87-874.
FMCR | 119.9 | 451.0 | 415.0 | 5,993 | 996 | HD 88-71.
Pine Cr | OK McCurtain | Little R | F | 388.1 | 480.0 | 443.5 | 17,230 | 4,980 | PL 85-500.
FMAC | 77.6 | 443.5 | 414.0 | 4,980 | 700 | HD 170-85-1.
Proctor Lk | TX Comanche | Leon R | F | 310.1 | 1,197.0 | 1,162.0 | 14,010 | 4,610 | PL 83-780, HD 535-81-2.
Sam Rayburn Res | TX Jasper, San Augustine, Angelina | Angelina R | F | 1,099.4 | 173.0 | 164.4 | 142,700 | 114,500 | HD 981-76-1.
PMC | 1,446.2 | 164.4 | 149.0 | 114,500 | 74,040
Santa Rosa | NM Guadalupe | Pecos R | F | 340.0 | 4,746.2 | 4,776.5 | 10,740 | 3,823 | PL 83-780.
FI | 160.0 | 4,776.5 | 4,746.2 | 7,115 | 3,823
Sardis | OK Pushmatah | Jackfork Cr | F | 122.6 | 607.0 | 599.0 | 16,960 | 13,610 | HD 602-79-2.
FMR | 274.2 | 599.0 | 542.0 | 13,610 | 40
Somerville Lk | TX Washington, Lee, Burleson | Yegua Cr | F | 337.7 | 258.0 | 238.0 | 24,400 | 11,460 | PL 83-780.
M | 143.9 | 238.0 | 200.0 | 11,460 | 0
Stiatook | OK Osage | Hominy Cr | F | 178.0 | 729.0 | 714.0 | 13,690 | 10,190 | HD 563-87.
FMARC | 311.6 | 714.0 | 657.0 | 10,190 | 1,430
Stillhouse H. Lk | TX Bell | Lampasas R | F | 390.6 | 666.0 | 622.0 | 11,830 | 6,430 | PL 83-780.
M | 204.9 | 622.0 | 498.0 | 6,430 | 0
Table Rock Lk | MO Taney, Stone, Barry | White R | F | 760.0 | 931.0 | 915.0 | 52,250 | 43,070 | PL 77-228.
AR Carroll, Boone | FP | 1,181.50 | 915.0 | 881.0 | 43,070 | 27,300 | FCA 1938.
Tenkiller Ferry Lk | OK Cherokee, Sequoyah | Illinois R | F | 576.7 | 667.0 | 632.0 | 20,800 | 12,900 | RHA 1946.
FP | 371.0 | 632.0 | 594.5 | 12,900 | 7,370
Texoma Lk, Denison Dam | TX Marshall | Red R | F | 2,669.0 | 640.0 | 617.0 | 144,000 | 88,000 | PL 75-761.
OK Bryan, Cook, Grayson | FPM | 1,612.0 | 617.0 | 590.0 | 88,000 | 41,000
Toronto Lk | KS Woodson | Verdigris R | F | 179.8 | 931.0 | 901.5 | 11,740 | 2,660 | HD 440-76-1.
FMA | 10.7 | 901.5 | 896.7 | 2,660 | 1,720
Trinidad Lk | CO Las Animas | Purgatorie R | F | 58.0 | 6,260.0 | 6,230.0 | 2,107 | 1,453 | PL 85-500.
FI | 20.0 | 6,230.0 | 0.0 | 1,453 | 0
Two Rivers Dam | NM Chaves | Rio Hondo R | F | 150.0 | 4,032.0 | 3,945.0 | 4,806 | 0 | PL 83-780.
Waco Lk | TX Mclennan | Bosque R | F | 3.3 | 500.0 | 455.0 | 19,440 | 7,270 | PL 83-780.
M | 100.8 | 455.0 | 370.0 | 7,240 | 0 | HD 535-81-2.
Waurika Lk | OK Jefferson | Beaver Cr | F | 140.4 | 962.5 | 951.4 | 15,000 | 10,100 | PL 88-253.
FMCAR | 199.7 | 951.4 | 910.0 | 10,100 | 830
Whitney Lk | TX Hill, Bosquel | Brazos R | F | 1,372.0 | 571.0 | 533.0 | 49,820 | 23,560 | PL 77-228.
PM | 381.9 | 533.0 | 425.0 | 23,560 | 475 | HD 390-76-1.
Wister Lk | OK Leflore | Pouteau R | F | 387.0 | 502.5 | 474.6 | 23,070 | 5,000 | PL 75-761.
Wright Patman Lk | TX Bowie, Cass | Sulphur R | F | 2,363.7 | 259.5 | 220.0 | 119,700 | 20,300 | PL 79-526.
FM | 142.7 | 220.0 | 180.0 | 20,300 | 0
1 Res—Reservoir; Lk—Lake; Div—Diversion: R—River; Cr—Creek; Fk—Fork; L&D—Lock & Dam; GIWW—Gulf Intercoastal Waterway; FG—Floodgate; CS—Control Structure: DS—Drainage Structure; PS—Pump Station.
2 F—Flood Control; N—Navigation; P—Hydropower; I—Irrigation; M—Municipal and/or Industrial Water/Supply; C—Fish and Wildlife Conservation; R—Recreation; A—Low Flow Augmentation or Pollution Abatement; Q—Quality or Silt Control.
3 PL—Public Law; HD—House Document; RHA—River & Harbor Act; PW—Public Works: FCA—Flood Control Act; WSA—Water Supply Act.
[47 FR 44544, Oct. 8, 1982, as amended at 52 FR 15804, Apr. 30, 1987; 52 FR 23816, June 25, 1987; 57 FR 35757, Aug. 11, 1992. Redesignated at 60 FR 19851, Apr. 21, 1995]
§ 222.6 National Program for Inspection of Non-Federal Dams.
(a) Purpose. This regulation states objectives, assigns responsibilities and prescribes procedures for implementation of a National Program for Inspection of Non-Federal Dams.
(b) Applicability. This regulation is applicable to all Divisions and Districts having Civil Works functions.
(c) References. (1) The National Dam Inspection Act, Pub. L. 92-367, 8 August 1972.
(2) Freedom of Information Act, Pub. L. 87-487, 4 July 1967.
(3) ER 500-1-1.
(d) Authority. The National Dam Inspection Act, Public Law 92-367, 8 August 1972 authorizes the Secretary of the Army, acting through the Chief of Engineers, to carry out a national program of inspection of non-Federal dams for the purpose of protecting human life and property.
(e) Scope. The program provides for:
(1) An update of the National Inventory of Dams.
(2) Inspection of the following non-Federal dams (the indicated hazard potential categories are based upon the location of the dams relative to developed areas):
(i) Dams which are in the high hazard potential category (located on Federal and non-Federal lands).
(ii) Dams in the significant hazard potential category believed by the State to represent an immediate danger to the public safety due to the actual condition of the dam.
(iii) Dams in the significant hazard potential category located on Federal lands.
(iv) Specifically excluded from the national inspection program are:
(A) Dams under the jurisdiction of the Bureau of Reclamation, the Tennessee Valley Authority, the International Boundary and Water Commission and the Corps of Engineers and
(B) Dams which have been constructed pursuant to licenses issued under the authority of the Federal Power Act, and
(C) Dams which have been inspected within the 12-month period immediately prior to the enactment of this act by a State agency and which the Governor of such State requests be excluded from inspection.
(f) Objectives. The objectives of the program are:
(1) To update the National Inventory of Dams by 30 September 1980.
(2) To perform the initial technical inspection and evaluation of the non-Federal dams described in paragraph 222.8(e) of this section to identify conditions which constitute a danger to human life or property as a means of expediting the correction of hazardous conditions by non-Federal interests. The inspection and evaluation is to be completed by 30 September 1981.
(3) To obtain additional information and experience that may be useful in determining if further Federal actions are necessary to assure national dam safety.
(4) Encourage the States to establish effective dam safety programs for non-Federal dams by 30 September 1981 and assist the States in the development of the technical capability to carry out such a program.
(g) Program execution—(1) Responsibilities. (i) The owner has the basic legal responsibility for potential hazards created by their dam(s). Phase II studies, as described in Chapter 4, Appendix D, and remedial actions are the owner's responsibility.
(ii) The State has the basic responsibility for the protection of the life and property of its citizens. Once a dam has been determined to be unsafe, it is the State's responsibility to see that timely remedial actions are taken.
(iii) The Corps of Engineers has the responsibility for executing the national program. The Federal program for inspection of dams does not modify the basic responsibilities of the States or dam owners. The Engineering Division of the Civil Works Directorate is responsible for overall program goals, guidance, technical criteria for inspections and inventory and headquarters level coordination with other agencies. The Water Resources Support Center (WRSC) located at Kingman Building, Fort Belvoir, Virginia 22060 is responsible for:
(A) Program Coordination of both the inventory and inspection programs.
(B) Developing and defining functional tasks to achieve program objectives.
(C) Determining resource requirements. (Budget)
(D) Compiling and disseminating progress reports.
(E) Monitoring and evaluating program progress and recommending corrective measures as needed.
(F) Collecting and evaluating data pertaining to inspection reports, dam owners' responses to inspection report recommendations, attitudes and capabilities of State officials, State dam safety legislation, Architect-Engineer performance, etc., for defining a comprehensive national dam safety program.
(G) Responding to Congressional, media, scientific and engineering organization and general public inquiries.
Division and District offices are responsible for executing the program at the State level. Assignment of Division responsibilities for States is shown in appendix A.
(2) State participation. Where State capability exists, every effort should be made to encourage the State to execute the inspection program either with State personnel or with Architect-Engineer (A-E) contracts under State supervision. If the State does not have the capability to carry out the inspection program, the program will be managed by the Corps of Engineers utilizing Corps employees or contracts with A-E firm.
(h) Update of National Inventory of Dams. (RCS-DAEN-CWE-17/OMB No. 49-RO421)
(1) The National Inventory of Dams should be updated and verified to include all Federal and non-Federal dams covered by the Act. Those dams are defined as all artificial barriers together with appurtenant works which impound or divert water and which: (1) Are twenty-five feet or more in height or (2) have an impounding capacity of fifty acre-feet or more. Barriers which are six feet or less in height, regardless of storage capacity or barriers which have a storage capacity at maximum water storage elevation of fifteen acre-feet or less regardless of height are not included.
(2) Inventory data for all dams shall be provided in accordance with appendix B.
(3) The hazard potential classification shall be in accordance with paragraph 2.1.2 Hazard Potential of the Recommended Guideline for Safety Inspection of Dams (Appendix D to this section).
Table 2—Hazard Potential Classification
Category | Urban development | Economic loss
Low | No permanent structure for human habitation | Minimal (Undeveloped to occasional structures or agriculture).
Significant | No urban development and no more than a small number of habitable structures | Appreciable (Notable agriculture, industry or structures).
High | Urban development with more than a small number of habitable structures | Excessive (Extensive community, industry or agriculture).
(4) As in the original development of the inventory, the States should be encouraged to participate in the work of completing, verifying and updating the inventory. Also, when available, personnel of other appropriate Federal agencies should be utilized for the inventory work on a reimbursable basis. Work in any State may be accomplished:
(i) Under State supervision utilizing State personnel or Architect-Engineers contracts.
(ii) Under Corps supervision utilizing Corps employees, employees of other Federal agencies or Architect-Engineer contracts.
(5) A minimum staff should be assigned in Districts and Divisions to administer and monitor the inventory activities. Generally, the work should be accomplished by architect-engineers or other Federal agency personnel under State or Corps supervision. Corps personnel should participate in the inventory only to the extent needed to assure that accurate data are collected.
(6) The National Inventory of Dams computerized data base in stored on the Boeing Computer Services (BCS) EKS computer system in Seattle, Washington. The data base uses Data Base Management System 2000 and is accessible for query by all Corps offices.
(7) Appendix B indicates details on accessing and updating inventory data.
(8) Appendix I describes the procedure for using NASA Land Satellite (LANDSAT) Multispectral Scanner data along with NASA's Surface Water Detection and Mapping (DAM) computer program to assist in updating and verifying and National Inventory of Dams.
(9) All inventory data for dams will be completed and verified utilizing all available sources of information (including LANDSAT overlay maps) and will include site visitation if required. It is the responsibility of the District Engineer to insure that the inventory of each State within his area of responsibility is accurate and contains the information required by the General Instructions for completing the forms for each Federal and non-Federal dam.
(i) [Reserved]
(j) Inspection Program. (RCS-DAEN-CWE-17 and OMB No. 49-RO421)
(1) Scheduling of inspections. The Governor of each State or his designee will continue to be involved in the selection and scheduling of the dams to be inspected. Priority will be given to inspection of those dams considered to offer the greatest potential threat to public safety.
(i) No inspection of a dam should be initiated until the hazard potential classification of the dam has been verified to the satisfaction of the Corps. Dams in the significant hazard category should be inspected only if requested by the State and only then if the State can provide information to show that the dam has deficiencies that pose an immediate danger to the public safety. Guidance for the selection of significant category non-Federal dams on Federal lands will be given in the near future.
(ii) Selection for inspection of non-Federal dams located on Federal lands or non-Federal dams designed and constructed under the jurisdiction of some Federal agency, should be coordinated with the responsible Federal agency. The appropriate State or regional representative of the Federal agency also should be contacted to obtain all available data on the dam. Representatives of the agency may participate in the inspection if they desire and should be given the opportunity to review and comment on the findings and recommendations in the inspection report prior to submission to the Governor and the dam owner. Examples of such dams are: non-Federal dams built on lands managed by National Forest Service, Bureau of Land Management, Fish and Wildlife Service, etc.; non-Federal dams designed and constructed by the Soil Conservation Service of the U.S. Department of Agriculture; high hazard mine tailings and coal mine waste dams under the jurisdiction of the Mine Safety and Health Administration, Department of Labor.
(iii) Indian-owned dams on trust lands are considered to be non-Federal dams. All dams in the high hazard potential category will be inspected. Privately-owned dams located on Indian lands are to be included in the program, however BIA-owned dams on Indian lands are Federal dams and are exempt.
(2) Procedures. The Division Engineer is responsible for the quality of inspections and reports prepared by the District Engineer. Close liaison between the District Engineer and the State agency or A-E firm responsible for the inspections will be required in order to obtain a dependable result. To avoid undesirable delays in the evaluation of safety of individual dams, contracts with A-E's or agreements with States which are managing the program will provide that reports be completed and furnished to the District Engineer within a specified time after completion of the on-site inspection of the dam.
(i) Inspection guidelines. The inspection should be conducted in accordance with the Recommended Guidelines for Safety Inspection of Dams (Appendix D to this section). Expanded Guidance for Hydrologic and Hydraulic Assessment of Dams is provided in appendix C. The criteria in the recommended guidelines are screening criteria to be used only for initial determinations of the adequacy of the dam. Conditions found during the investigation which do not meet the guideline recommendations should be assessed as to their importance from the standpoint of the degree of risk involved.
(ii) Coordinators. Experience has shown that coordination and communications among technical disciplines, Public Affairs Office, emergency officials, training officers, operations personnel, State representatives and A-E firms has been best in those districts where one person was delegated the responsibility for coordinating the actions of all involved elements. Each district should evaluate its overall coordination procedures to insure that all involved elements have the best possible access to necessary data.
(iii) Field investigations should be carried out in a systematic manner. A detailed checklist or inspection form should be developed and used for each dam inspection and appended to the inspection report. The size of the field inspection team should be as small as practicable, generally consisting of only one representative of each required discipline in order to control the costs of the inspection without sacrificing the quality of the inspection. The inspection team for the smaller less complex dams should be limited to two or three representatives from appropriate technical areas with additional specialists used only as special conditions warrant. The larger more complex projects may require inspection teams of three or four specialists. Performance of overly detailed and precise surveys and mapping should be avoided. Necessary measurement of spillway, dam slopes, etc. can generally be made with measuring tapes and hand levels.
(iv) Additional engineering studies. Dam inspections should be limited to Phase I investigations as outlined in Chapter 3 of appendix D. However, if recommended by the investigating engineer and approved by the District Engineer, some additional inexpensive investigations may be performed when a reasonable judgment on the safety of the dam cannot be made without additional investigation. Any further Phase II investigation needed to prove or disprove the findings of the District Engineer or to devise remedial measures to correct deficiencies are the responsibility of the owner and will not be undertaken by the Corps of Engineers.
(v) Assessment of the investigation. (A) The findings of the visual inspection and review of existing engineering data for a dam shall be assessed to determine its general condition. Dams assessed to be in generally good condition should be so described in the inspection report. Deficiencies found in a dam should be described and assessed as to the degree of risk they present. The degree of risk should consider only loss of life and/or property damage resulting from flooding due to dam failure. Loss of project benefits i.e., municipal water supply, etc., should not be considered. If deficiencies are assessed to be of such a nature that, if not corrected, they could result in the failure of the dam with subsequent loss of life and/or substantial property damage, the dam should be assessed as “Unsafe.” If the probable failure of an “Unsafe” dam is judged to be imminent and immediate action is required to reduce or eliminate the hazard, the “unsafe” condition of the dam should be considered an “emergency.” If the probable failure is judged not to be imminent, the “unsafe” condition should be considered a “non-emergency.”
(B) Adequacy of spillway. The “Recommended Guidelines for Safety Inspection of Dams,” appendix D, provide current, acceptable inspection standards for spillway capacity. Any spillway capacity that does not meet the criteria in the “Guidelines” is considered inadequate. When a spillway's capacity is so deficient that it is seriously inadequate, the project must be considered unsafe. If all of the following conditions prevail, the Governor of the State shall be informed that such project is unsafe:
(1) There is high hazard to loss of life from large flows downstream of the dam.
(2) Dam failure resulting from overtopping would significantly increase the hazard to loss of life downstream from the dam over that which would exist just before overtopping failure.
(3) The spillway is not capable of passing one-half of the probable maximum flood without overtopping the dam and causing failure.
Classification of dams with seriously inadequate spillways as “unsafe, non-emergency” is generally a proper designation of the urgency of the unsafe condition. However, there may be cases where the spillway capacity is unusually small and the consequences of dam overtopping and failure would be catastrophic. In such cases, the unsafe dam should be classified as an emergency situation.
(vi) All inspection reports will receive one level of independent review by the Corps. If the reports are prepared by the Corps, the independent review may be performed internally within the district office. However, in cases which involve significant economic, social or political impacts and technical uncertainties in evaluating the dams, advice may be obtained from the staffs of the Division Engineer and the Office, Chief of Engineers.
(3) Reports—(i) Preparation. A written report on the condition of each dam should be prepared as soon as possible after the completion of the field inspection and assessment. A suggested report format is attached as appendix E. It is important that the inspection report be completed in a timely manner. For inspections being done by Corps employees, it is suggested that once an inspection team has been assigned to a dam inspection it be allowed to complete the inspection and report without interruption by other work.
(ii) Review and approval. The coordinating engineer should determine which disciplines should review the report and establish a procedure to accomplish the review in a timely manner. A review panel, made up of the appropriate Division and Branch Chiefs has worked well in some districts. Use of a review panel should be seriously considered by all districts. All inspection reports shall be approved by the District Engineer who will maintain a complete file of final approved reports. Any State or Federal agency having jurisdiction over the dam or the land on which the dam is built should be given the opportunity to review and comment on the report prior to submission to the Governor or dam owner. The District Engineer will transmit final approved reports to the Governor of the State and the dam owner (or the Governor only, when requested in writing by State officials). If the report is initially furnished to the Governor only, a period of up to ten days may be allowed before the report is furnished to the dam owner. If the Governor or the owner indicates additional technical information is available that might affect the assessment of the dam's condition, the District Engineer will furnish the proposed final report to the Governor and the owner and establish a definite time period for comments to be furnished to the District Engineer prior to report approval.
(iii) In general the Governor will be responsible for public release of an inspection report and for initiating any public Statements. However, an approved report must be treated as any other document subject to release upon request under the Freedom of Information Act. The letters of transmittal to the Governor and owner should indicate that under the provisions of the Freedom of Information Act, the documents will be subject to release upon request after receipt by the Governor. Proposed final reports will be considered as internal working papers not subject to release under the Freedom of Information Act. Corps personnel, A-E contractor personnel and others working under supervision of the Corps will be cautioned to avoid public statements about the condition of the dam until after the District Engineer has approved the report. The Corps will respond fully to inquiries after the Governor has received the approved report or been notified of an unsafe dam. An information copy of the report should be sent to the District office normally having jurisdiction if other than the District responsible for the inspection.
(iv) Follow-up action. A Federal investment of the magnitude anticipated for this inspection program makes it desirable that a reporting system be established to keep the District Engineer abreast of the implementation of the recommendations in the inspection reports. The letters of transmittal to the Governor and owner will request that the District Engineer be informed of the actions taken on the recommendations in the inspection reports. However, the National Dam Inspection Act only authorizes the initial inspection of certain dams; therefore, once a report is completed no reinspection will be undertaken.
(4) Unsafe dams. The investigating engineer will be required to immediately notify the District Engineer when a dam is assessed as being unsafe. He will also indicate if probable failure of the unsafe dam is judged to be imminent and immediate action is required to reduce or eliminate the threat. The District Engineer will evaluate the findings of the investigating team and will immediately notify the Governor and the owner if the findings are Unsafe Non-Emergency or Unsafe-Emergency. The appropriate State agency and the Corps of Engineers officials having emergency operation responsibility for the area in which the dam is located will also be notified. The information provided in the unsafe dam notice shall be as indicated in Appendix F. Any emergency procedures or remedial actions deemed necessary by the District Engineer will be recommended to the Governor who has the responsibility for any corrective actions. As provided in ER 500-1-1, Corps assistance under Pub. L. 84-99 “Advance Measures,” may be made available to complement the owner's and Governor's action under certain conditions and subject to the approval of the Director of Civil Works. The District Engineer's Emergency Operation Officer will coordinate the advance measures request in accordance with existing procedures. Coordination will be maintained between the District responsible for emergency action under Pub. L. 84-90 and the District responsible for the inspection.
(5) Emergency action plans. An emergency action plan should be available for every dam in the high and significant hazard category. Such plans should outline actions to be taken by the operator to minimize downstream effects of an emergency and should include an effective warning system. If an emergency action plan has not been developed, the inspection report should recommend that the owner develop such an action plan. However, the Corps has no authority to require an emergency action plan.
(k) Progress reports. Progress reports should be submitted monthly by the Division Engineer to WRSC. The reports shall include progress through the last Saturday of the month and should be mailed by the following Monday. The reports shall contain the information and be typewritten in the format shown in appendix G. Copies of Unsafe Dam Data Sheets will be submitted with the progress report. Copies of the completed inspection report for Dams in the Unsafe-Emergency category will be submitted also. (RCS-DAEN-CWE-19)
(l) Contracts—(1) Corps of Engineers supervision. Contracts for performing inventory and inspection activities under supervision of the Corps of Engineers shall be Fixed-Price Architect Engineer Contracts for Services. A sample scope of work setting forth requirements is provided in appendix H. Experience has shown that costs for individual dam inspection have been lower when multiple inspections are included in one contract. Therefore, each A-E contract should include multiple dam inspections where practicable. Corps participation in A-E inspections should be held to a minimum. Corps representatives should participate in only enough A-E inspections to assure the equality of the inspections.
(2) State supervision. Contracts with States for performing inventory and inspection activities under State supervision may be either a Cost-Reimbursement type A-E Contract for Services or a Fixed-Price type contract. The selection of Architect-Engineers by the State should require approval of the Corps of Engineers Contracting Officer. The negotiated price for A-E services under cost-reimbursement type contracts with States will also require approval by the Contracting Officer. Contracts with States should require timely submission of the inspection reports to the District Engineer for review and approval. The contract provisions should also prevent public release of or public comment on the inspection report until the District Engineer has reviewed and approved the report. Corps of Engineers participation in State inspections should be limited to occasional selected inspections to assure the quality of the State program.
(m) Training. As indicated in paragraph (f) of this section, one objective of the inspection program for non-Federal Dams is to prepare the States to provide effective dam safety programs. In many States this will require training of personnel of State agencies in the technical aspects of dam inspections. The Office, Chief of Engineers is studying the need for and content of a comprehensive Corps-sponsored training program in dam inspection technology. Pending the possible adoption of such a comprehensive plan, division and district Engineers are encouraged to take advantage of suitable opportunities to provide needed training in dam safety activities to qualified employees of State agencies and, when appropriate, to employees of architect-engineer firms engaged in the program. The following general considerations should be observed in providing such training:
(1) Priority must be placed on inspection of dams and updating the national dam inventory; hence, diversion of resources to training activities should not deter or delay these principle program functions.
(2) Salaries, per diem and travel expenses relating to training activities of State employees will be a State expense. There will be no tuition charge for State employees.
(3) Architect-Engineer firms will be required to pay expenses and tuition costs for their employees participating in Corps-sponsored training activities.
(4) Corps-sponsored training will require that each trainee is a qualified engineer or geologist and will concentrate on engineering technology related directly to dam safety. (This may require screening of proposed candidates for training.)
(5) Under this program, the Corps will not sponsor training that is intended primarily to satisfy requirements for a degree.
(6) Training by participation in actual dam inspections and/or management of the inspection program should be encouraged.
Appendix A to § 222.6—Division Assignments
To facilitate better coordination with the States, the Division Engineers are responsible for the dam inspection program by States as follows:
New England Division: Maine, Rhode Island, Connecticut, Vermont, New Hampshire, Massachusetts North Atlantic Division: New York, New Jersey, Pennsylvania, Delaware, Maryland, Virginia, District of Columbia Ohio River Division: West Virginia, Ohio, Kentucky, Tennessee, Indiana South Atlantic Division: North Carolina, South Carolina, Georgia, Florida, Alabama, Puerto Rico, Virgin Islands Lower Mississippi Valley Division: Mississippi, Louisiana, Missouri North Central Division: Michigan, Wisconsin, Illinois, Minnesota, Iowa Southwestern Division: Arkansas, Oklahoma, Texas, New Mexico Missouri River Division: Kansas, Nebraska, South Dakota, North Dakota, Wyoming, Colorado North Pacific Division: Oregon, Idaho, Montana, Washington, Alaska South Pacific Division: Utah, California, Arizona, Nevada Pacific Ocean Division: Hawaii, Trust Territories, American Samoa
Appendix B to § 222.6—Inventory of Dams (RCS-DAEN-CWE-17 and OMB No. 49-RO421)
1. The updating of the inventory will include the completion of all items of data for all dams now included in the inventory, verification of the data now included in the inventory, and inclusion of complete data for all appropriate existing dams not previously listed. Data completion, verification and updating will be scheduled over a three year period.
2. The inventory data will be recorded on Engineering Form 4474 and 4474A (Exhibit 2). The general instructions for completing the forms are printed on the back of the forms. Parts I and II of the forms are to be fully completed. The instruction for completing Item 29, Line 5, Para. II (Engr Form 4474A) is revised to conform identically with the hazard potential classification contained in the recommended guidelines for safety inspection of dams. Additional data has been added to designate Corps districts in which the dam is located, Federal agency owned dams, Corps owned dams, Federal agency regulated dams, dams constructed with technical or financial assistance of the U.S. Soil Conservation Service, and privately owned dams located on Federal property.
3. All inventory data will be verified utilizing all available sources of information and will include site visitation if required.
4. The Inventory Data Base is stored on the Boeing Computer Services (BCS) EKS System in Seattle, Washington. The data is available to all Corps offices for queries using Data Base Management System 2000 (S2K).
a. To access the National Data Base log on BCS and type the following:
GET,DAMS/UN = CECELB CALL,DAMS
b. For current information and changes to the National Inventory Data Base, type:
OLD,HOTDAM/UN = CEC1AT LIST
5. The inventory update data will be furnished and the National Data Base will be updated on a monthly basis. The monthly submission will cover all dams whose inventory data were completed since the last report. The update data will be loaded directly onto the Boeing Computer by the field office.
a. The procedure for loading the data on the Boeing Computer can be printed by accessing the Boeing Computer and listing the information file “HOTDAM.” (See paragraph 4b. above.)
b. It is the responsibility of the submitting office to edit the data prior to furnishing it for the update. Editing will be accomplished by processing the data using the Inventory Edit Computer program developed by the Kansas City District. This procedure is described in the “HOTDAM” file.
6. Federal agencies will be uniformly designated by major and minor abbreviations according to the following list whenever applicable to Items 46 through 53. Abbreviations are to be left justified within the field with one blank separating major and minor abbreviations.
Major | Minor
a. International Boundary and Water Commission | IBWC
b. U.S. Department of Agriculture:
(1) Soil Conservation Service | USDA | SCS
(2) Forest Service | USDA | FS
c. U.S. Department of Energy Federal Energy Regulatory Commission | DOE | FERC
d. Tennessee Valley Authority | TVA
e. U.S. Department of Interior:
(1) Bureau of Sport Fisheries and Wildlife | DOI | BSFW
(2) Geological Survey | DOI | GS
(3) Bureau of Land Management | DOI | BLM
(4) Bureau of Reclamation | DOI | USBR
(5) Bureau of Indian Affairs | DOI | BIA
f. U.S. Department of Labor: (1) Mine Safety and Health Administration | DOL | MSHA
g. Corps of Engineers:
(1) Lower Mississippi Valley Division:
(a) Memphis District | DAEN | LMM
(b) New Orleans District | DAEN | LMN
(c) St. Louis District | DAEN | LMS
(d) Vicksburg District | DAEN | LMK
(2) Missouri River Division:
(a) Kansas City District | DAEN | MRK
(b) Omaha District | DAEN | MRO
(3) New England Division | DAEN | NED
(4) North Atlantic Division:
(a) Baltimore District | DAEN | NAB
(b) New York District | DAEN | NAN
(c) Norfolk District | DAEN | NAO
(d) Philadelphia District | DAEN | NAP
(5) North Central Division:
(a) Buffalo District | DAEN | NCB
(b) Chicago District | DAEN | NCC
(c) Detroit District | DAEN | NCE
(d) Rock Island District | DAEN | NCR
(e) St. Paul District | DAEN | NCS
(6) North Pacific Division:
(a) Alaska District | DAEN | NPA
(b) Portland District | DAEN | NPP
(c) Seattle District | DAEN | NPS
(d) Walla Walla District | DAEN | NPW
(7) Ohio River Division:
(a) Huntington District | DAEN | ORH
(b) Louisville District | DAEN | ORL
(c) Nashville District | DAEN | ORN
(d) Pittsburgh District | DAEN | ORP
(8) Pacific Ocean Division | DAEN | POD
(9) South Atlantic Division:
(a) Charleston District | DAEN | SAC
(b) Jacksonville District | DAEN | SAJ
(c) Mobile District | DAEN | SAM
(d) Savannah District | DAEN | SAS
(e) Wilmington District | DAEN | SAW
(10) South Pacific Division:
(a) Los Angeles District | DAEN | SPL
(b) Sacramento District | DAEN | SPK
(c) San Franciso District | DAEN | SPN
(11) Southwestern Division:
(a) Albuquerque District | DAEN | SWA
(b) Fort Worth District | DAEN | SWF
(c) Galveston District | DAEN | SWG
(d) Little Rock District | DAEN | SWL
(e) Tulsa District | DAEN | SWT
7. Procedures for Revising and Updating the Inventory of Dams Master File.
a. To Change Correct or Add an Item. Submit a change card that contains the identification assigned to the dams (Columns 1 thru 7), the proper card code (Column 80) and only the item or items changed, corrected or added. Data on the master file is added or replaced on an item for item basis.
b. To Delete an Item. Submit a change card that contains the identification assigned to the dam, (Columns 1 thru 7), the proper card code (Column 80), and an asterisk (*) in the left most column of the item or items to be deleted. More than one item can be changed, corrected, added on or deleted from the same card.
c. To Delete the Entire Data for a Dam from the Master File. Submit a zero (0) card punched as follows:
Columns 1 thru 7—Item 1 identification assigned to the dam Columns 8 thru 10—Item 2, Division Code Columns 11 thru 16—The word DELETE Columns 17 thru 79—Blank Spaces Column 80—A zero
8. Keypunch Instructions and Punched Card Formats.
a. Table 1 describes the character set to be used for keypunch cards of Engr. Forms 4474 and 4474A.
b. Exhibit 1 is the EDPC keypunch instructions and punch card formats defining the data fields (Items) and card columns to be used in preparing punched cards in compliance with the requirements of this regulation.
c. Exhibit 2 are prints of Engr. Forms 4474 and 4474A which are laid out in punch card format to facilitate punching cards directly from the completed forms.
Appendix C to § 222.6—Hydrologic and Hydraulic Assessment of Dams
1. Phase I inspections are not intended to provide detailed hydrologic and hydraulic analyses of dam and reservoir capabilities. However, when such analyses are available, they should be evaluated for reliability and completeness. If a project's ability to pass the appropriate flood (see Table 3, page D-12 of Recommended Guidelines) can be determined from available information of a brief study, such an assessment should be made. It should be noted that hydrologic and hydraulic analyses connected with the Phase I inspections should be based on approximate methods or systematized computer programs that take minimal effort. The Hydrologic Engineering Center (HEC) has developed a special computer program for hydrologic and hydraulic analyses to be used with the Phase I inspection program. Other Field Operating Agencies have developed similar computer programs or generalized procedures which are acceptable for use. All such efforts should be completed with minimum resources.
2. A finding that a dam will not safely pass the flood indicated in the Recommended Guidelines does not necessarily indicate that the dam should be classified as unsafe. The degree of inadequacy of the spillway to pass the appropriate flood and the probable adverse impacts of dam failure because of overtopping must be considered in making such classification. The following criteria have been selected which indicate when spillway capacity is so seriously inadequate that a project must be classified as unsafe. All of the following conditions must prevail before designating a dam unsafe:
a. There is high hazard to loss of life from large flows downstream of the dam.
b. Dam failure resulting from overtopping would significantly increase the hazard to loss of life downstream from the dam from that which would exist just before overtopping failure.
c. The spillway is not capable of passing one-half of the probable maximum flood without overtopping the dam and causing failure.
3. The above criteria are generally adequate for evaluating most non-Federal dams. However, in a few cases the increased hazard potential from overtopping and failure is so great as to result in catastrophic consequences. In such cases, the evaluation of condition 2c should utilize a flood more closely approximating the full probable maximum flood rather than one-half the flood. An example of such a situation would be a large dam immediately above a highly populated flood plain, with little likelihood of time for evacuation in the event of an emergency.
4. Conditions 2a and 2b require an approximation of housing location in relation to flooded areas. Resources available in Phase I inspections do not permit detailed surveys or time-consuming studies to develop such relationships. Therefore, rough estimates will generally be made from data obtained during the inspection and from readily available maps and drawings. Brief computer routings such as the HEC-1 dam break analysis, using available data, are recommended in marginal cases. The HEC-1, dam break version, is available on the Boeing Computer Services or may be obtained from the Hydrologic Engineering Center, Davis, California. Available resources do not permit detailed studies or investigations to establish the amount of overtopping that would cause a dam to fail, as designated in condition 2c. Professional judgment and available information will have to be used in these determinations. When detailed investigations and studies are required to make a reasonable judgment of the conditions which designate an unsafe dam, the inspection report should recommend that such studies be the responsibility of the dam owner.
5. During the inspection of a dam, consideration should be given to impacts on other dams located downstream from the project being inspected. When failure of a dam would be likely to cause failure of another dam(s) downstream, its designation as an unsafe dam could result in multiple impacts. Therefore, the information should be explicitly described in the inspection report. Such information may be vital to the priorities established by State Governors for dam improvements. Similarly, when the failure of an upstream dam (classified as unsafe) could cause failure of the dam being inspected, this information should be prominently displayed in the inspection report.
6. The criteria established in paragraph 2 for designating unsafe dams because of seriously inadequate spillways are considered reasonable and prudent. They provide a consistent bases for declaring unsafe dams and also serve as an effective compromise between the Recommended Guidelines and unduly low standards suggested by special interests and individuals unfamiliar with flood hazard potential.
7. The Hydrometeorological Branch (HMB) of the National Weather Service has reviewed some 500 experienced large storms in the United States. The purpose of the review was to ascertain the relative magnitude of experienced large storms to probable maximum precipitation (PMP) and their distribution throughout the country. Their review reveals that about 25 percent of the major storms have exceeded 50 percent of the probable maximum precipitation for one or more combinations of area and duration. In fact some storms have very closely approximated the PMP values. Exhibits C-1 thru C-5 indicate locations where experienced storms have exceeded 50 percent of the PMP.
8. There are several options to consider when selecting mitigation measures to avoid severe consequences of a dam failure from overtopping. The following measures may be required by a Governor when sufficient legal authority is available under State laws and a dam presents a serious threat to loss of life.
a. Remove the dam.
b. Increase the height of dam and/or spillway size to pass the probable maximum flood without overtopping the dam.
c. Purchase downstream land that would be adversely impacted by dam failure and restrict human occupancy.
d. Enhance the stability of the dam to permit overtopping by the probable maximum flood without failure.
e. Provide a highly reliable flood warning system (generally does not prevent damage but avoids loss of life).
Table 1—Storms With Rainfall ≥150% of PMP, U.S. East of the 105th Meridian (for 10 mi 2, 6 Hours; 200 mi 2, 24 Hours and/or 1,000 mi 2, 48 Hours)
Storm date | Index No. | Corps assignment No. (if available) | Storm center | Latitude | Longitude
Town | State
July 26, 1819 | 1 | Catskill | NY | 42°12′ | 73°53′
Aug. 5, 1843 | 2 | Concordville | PA | 39°53′ | 75°32′
Sept. 10-13, 1878 | 3 | OR 9-19 | Jefferson | OH | 41°45′ | 80°46′
Sept. 20-24, 1882 | 4 | NA 1-3 | Paterson | NJ | 40°55′ | 74°10′
June 13-17, 1886 | 5 | LMV 4-27 | Alexandria | LA | 31°19′ | 92°33′
June 27-July 11, 1899 | 6 | GM 3-4 | Turnersville | TX | 30°52′ | 96°32′
Aug. 24-28, 1903 | 7 | MR 1-10 | Woodburn | IA | 40°57′ | 93°35′
Oct. 7-11, 1903 | 8 | GL 4-9 | Paterson | NJ | 40°55′ | 74°10′
July 18-23, 1909 | 9 | UMV 1-11B | Ironwood | MI | 46°27′ | 90°11′
July 18-23, 1909 | 10 | UMV 1-11A | Beaulieu | MN | 47°21′ | 95°48′
July 22-23, 1911 | 11 | Swede Home | NB | 40°22′ | 96°54′
July 19-24, 1912 | 12 | GL 2-29 | Merrill | WI | 45°11′ | 89°41′
July 13-17, 1916 | 13 | SA 2-9 | Altapass | NC | 35°33′ | 82°01′
Sept. 8-10, 1921 | 14 | GM 4-12 | Taylor | TX | 30°35′ | 97°18′
Oct. 4-11, 1924 | 15 | SA 4-20 | New Smyrna | FL | 29°07′ | 80°55′
Sept. 17-19, 1926 | 16 | MR 4-24 | Boyden | IA | 43°12′ | 96°00′
Mar. 11-16, 1929 | 17 | UMV 2-20 | Elba | AL | 31°25′ | 86°04′
June 30-July 2, 1932 | 18 | GM 5-1 | State Fish Hatchery | TX | 30°01′ | 99°07′
Sept. 16-17, 1932 | 19 | Ripogenus Dam | ME | 45°53′ | 69°09′
July 22-27, 193 | 20 | LMV 2-26 | Logansport | LA | 31°58′ | 94°00′
Apr. 3-4 1934 | 21 | SW 2-11 | Cheyenne | OK | 35°37′ | 99°40′
May 30-31, 1935 | 22 | MR 3-28A | Cherry Creek | CO | 39°13′ | 104°32′
May 31, 1935 | 23 | GM 5-20 | Woodward | TX | 29°20′ | 99°28′
July 6-10, 1935 | 24 | NA 1-27 | Hector | NY | 42°30′ | 76°53′
Sept. 2-6, 1935 | 25 | SA 1-26 | Easton | MD | 38°46′ | 76°01′
Sept. 14-18, 1936 | 26 | GM 5-7 | Broome | TX | 31°47′ | 100°50′
June 19-20, 1939 | 27 | Snyder | TX | 32°44′ | 100°55′
July 4-5, 1939 | 28 | Simpson | KY | 38°13′ | 83°22′
Aug. 19, 1939 | 29 | NA 2-3 | Manahawkin | NJ | 39°42′ | 74°16′
June 3-4, 1940 | 30 | MR 4-5 | Grant Township | NB | 42°01′ | 96°53′
Aug. 6-9, 1940 | 31 | LMV 4-24 | Miller Isl | LA | 29°45′ | 92°10′
Aug. 10-17, 1940 | 32 | SA 5-19A | Keysville | VA | 37°03′ | 78°30′
Sept. 1, 1940 | 33 | NA 2-4 | Ewan | NJ | 39°42′ | 75°12′
Sept. 2-6, 1940 | 34 | SW 2-18 | Hallet | OK | 36°15′ | 96°36′
Aug. 28-31, 1941 | 35 | UMV 1-22 | Haywood | WI | 46°00′ | 91°28′
Oct. 17-22, 1941 | 36 | SA 5-6 | Trenton | FL | 29°48′ | 82°57′
July 17-18, 1942 | 37 | OR 9-23 | Smethport | PA | 41°50′ | 78°25′
Oct. 11-17, 1942 | 38 | SA 1-28A | Big Meadows | VA | 38°31′ | 78°26′
May 6-12, 1943 | 39 | SW 2-20 | Warner | OK | 35°29′ | 95°18′
May 12-20, 1943 | 40 | SW 2-21 | Nr. Mounds | OK | 35°52′ | 96°04′
July 27-29, 1943 | 41 | GM 5-21 | Devers | TX | 30°02′ | 94°35′
Aug. 4-5, 1943 | 42 | OR 3-30 | Nr. Glenville | WV | 38°56′ | 80°50′
June 10-13, 1944 | 43 | MR 6-15 | Nr. Stanton | NB | 41°52′ | 97°03′
Aug. 12-15, 1946 | 44 | MR 7-2A | Cole Camp | MO | 38°40′ | 93°13′
Aug. 12-16, 1946 | 45 | MR 7-2B | Nr. Collinsville | IL | 38°40′ | 89°59′
Sept. 26-27, 1946 | 46 | GM 5-24 | Nr. San Antonio | TX | 29°20′ | 98°29′
June 23-24, 1948 | 47 | Nr. Del Rio | TX | 29°22′ | 100°37′
Sept. 3-7, 1950 | 48 | SA 5-8 | Yankeetown | FL | 29°03′ | 82°42′
June 23-28, 1954 | 49 | SW 3-22 | Vic Pierce | TX | 30°22′ | 101°23′
Aug. 17-20, 1955 | 50 | NA 2-22A | Westfield | MA | 42°07′ | 72°45′
May 15-16, 1957 | 51 | Hennessey | OK | 36°02′ | 97°56′
June 14-15, 1957 | 52 | Nr. E. St. Louis | IL | 38°37′ | 90°24′
June 23-24, 1963 | 53 | David City | NB | 41°14′ | 97°05′
June 13-20, 1965 | 54 | Holly | CO | 37°43′ | 102°23′
June 24, 1966 | 55 | Glenullin | ND | 47°21′ | 101°19′
Aug. 12-13, 1966 | 56 | Nr. Greely | NB | 41°33′ | 98°32′
Sept. 19-24, 1967 | 57 | SW 3-24 | Falfurrias | TX | 27°16′ | 98°12′
July 16-17, 1968 | 58 | Waterloo | IA | 42°30′ | 92°19′
July 4-5, 1969 | 59 | Nr. Wooster | OH | 40°50′ | 82°00′
Aug. 19-20, 1969 | 60 | NA 2-3 | Nr. Tyro | VA | 37°49′ | 79°00′
June 9, 1972 | 61 | Rapid City | SD | 44°12′ | 103°31′
June 19-23, 1972 | 62 | Zerbe | PA | 40°37′ | 76°31′
July 21-22, 1972 | 63 | Nr. Cushing | MN | 46°10′ | 94°30′
Sept. 10-12, 1972 | 64 | Harlan | IA | 41°43′ | 95°15′
Oct. 10-11, 1973 | 65 | Enid | OK | 36°25′ | 97°52′
Table 2—Storms With Rainfall ≥50% of PMP, U.S. West of Continental Divide (for 10 mi 2 6 Hours or 1,000 mi 2 for One Duration Between 6 and 72 Hours)
Storm date | Index No. | Storm center | Latitude | Longitude | Duration for 1,000 mi 2
Town | State
Aug. 11, 1890 | 1 | Palmetto | NV | 37°27′ | 117°42′
Aug. 12, 1891 | 2 | Campo | CA | 32°36′ | 116°28′
Aug. 28, 1898 | 3 | Ft. Mohave | AZ | 35°03′ | 114°36′
Oct. 4-6, 1911 | 4 | Gladstone | CO | 37°53′ | 107°39′
Dec. 29, 1913-Jan. 3, 1914 | 5 | CA | 39°55′ | 121°25′
Feb. 17-22, 1914 | 6 | Colby Ranch | CA | 34°18′ | 118°07′
Feb. 20-25, 1917 | 7 | CA | 37°35′ | 119°36′
Sept. 13, 1918 | 8 | Red Bluff | CA | 40°10′ | 122°14′
Feb. 26-Mar 4, 1938 | 9 | CA | 34°14′ | 117°11′
Mar. 30-Apr. 2, 1931 | 10 | ID | 46°30′ | 114°50′ | 24
Feb. 26, 1932 | 11 | Big Four | WA | 48°05′ | 121°30′
Nov. 21, 1933 | 12 | Tatoosh Is | WA | 48°23′ | 124°44′
Jan. 20-25, 1935 | 13 | WA | 47°30′ | 123°30′ | 6
Jan. 20-25, 1935 | 14 | WA | 47°00′ | 122°00′ | 72
Feb. 4-8, 1937 | 15 | Cyamaca Dam | CA | 33°00′ | 116°35′
Dec. 9-12, 1937 | 16 | CA | 38°51′ | 122°43′
Feb. 27-Mar. 4, 1938 | 17 | AZ | 34°57′ | 111°44′ | 12
Jan. 19-24, 1943 | 18 | CA | 37°35′ | 119°25′ | 18
Jan. 19-24, 1943 | 19 | Hoegee's Camp | CA | 34°13′ | 118°02′
Jan. 30-Feb. 3, 1945 | 20 | CA | 37°35′ | 119°30′
Dec. 27, 1945 | 21 | Mt. Tamalpias | CA | 37°54′ | 122°34′
Nov. 13-21, 1950 | 22 | CA | 36°30′ | 118°30′ | 24
Aug. 25-30, 1951 | 23 | AZ | 34°07′ | 112°21′ | 72
July 19, 1955 | 24 | Chiatovich Flat | CA | 37°44′ | 118°15′
Aug. 16, 1958 | 25 | Morgan | UT | 41°03′ | 111°38′
Sept. 18, 1959 | 26 | Newton | CA | 40°22′ | 122°12′
June 7-8, 1964 | 27 | Nyack Ck | MT | 48°30′ | 113°38′ | 12
Sept. 3-7, 1970 | 28 | UT | 37°38′ | 109°04′ | 6
Sept. 3-7, 1970 | 29 | AZ | 33°49′ | 110°56′ | 6
June 7, 1972 | 30 | Bakersfield | CA | 35°25′ | 119°03′
Dec. 9-12, 1937 | 31 | CA | 39°45′ | 121°30′ | 48
Appendix D to § 222.6—Recommended Guidelines for Safety Inspection of Dams Department of the Army—Office of the Chief of Engineers Preface
The recommended guidelines for the safety inspection of dams were prepared to outline principal factors to be weighed in the determination of existing or potential hazards and to define the scope of activities to be undertaken in the safety inspection of dams. The establishment of rigid criteria or standards is not intended. Safety must be evaluated in the light of peculiarities and local conditions at a particular dam and in recognition of the many factors involved, some of which may not be precisely known. This can only be done by competent, experienced engineering judgment, which the guidelines are intended to supplement and not supplant. The guidelines are intended to be flexible, and the proper flexibility must be achieved through the employment of experienced engineering personnel.
Conditions found during the investigation which do not meet guideline recommendations should be assessed by the investigator as to their import from the standpoint of the involved degree of risk. Many deviations will not compromise project safety and the investigator is expected to identify them in this manner if that is the case. Others will involve various degrees of risk, the proper evaluation of which will afford a basis for priority of subsequent attention and possible remedial action.
The guidelines present procedures for investigating and evaluating existing conditions for the purpose of identifying deficiencies and hazardous conditions. The two phases of investigation outlined in the guidelines are expected to accomplish only this and do not encompass in scope the engineering which will be required to perform the design studies for corrective modification work.
It is recognized that some States may have established or will adopt inspection criteria incongruous in some respects with these guidelines. In such instances assessments of project safety should recognize the State's requirements as well as guideline recommendations.
The guidelines were developed with the help of several Federal agencies and many State agencies, professional engineering organizations, and private engineers. In reviewing two drafts of the guidelines they have contributed many helpful suggestions. Their contributions are deeply appreciated and have made it possible to evolve a document representing a consensus of the engineering fraternity. As experience is gained with use of the guidelines, suggestions for future revisions will be generated. All such suggestions should be directed to the Chief of Engineers, U.S. Army, DAEN-CWE-D, Washington, D.C. 20314.
Recommended Guidelines for Safety Inspection of Dams Table of Contents Preface Chapter 1—Introduction Para. 1.1 Purpose. 1.2 Applicability. 1.3 Authority. Chapter 2—General Requirements 2.1 Classification of dams. 2.1.1 Size. 2.1.2 Hazard potential. 2.2 Selection of dams to be investigated. 2.3 Technical investigations. 2.4 Qualifications of investigators. 2.5 Reports. Chapter 3—Phase I Investigation 3.1 Purpose. 3.2 Scope. 3.3 Engineering data. 3.4 Field inspections. 3.5 Evaluation of hydraulic and hydrologic features. 3.5.1 Design data. 3.5.2 Experience data. 3.6 Evaluation of structural stability. 3.6.1 Design and construction data. 3.6.2 Operating records. 3.6.3 Post contruction changes. 3.6.4 Seismic stability. Chapter 4—Phase II Investigation 4.1 Purpose. 4.2 Scope. 4.3 Hydraulic and hydrologic analysis. 4.3.1 Maximum water surface based on SDF peak inflow. 4.3.1.1 Peak for 100-year flood. 4.3.1.2 Peak for PMF or fraction thereof. 4.3.2 Maximum water surface based on SDF hydrograph. 4.3.3 Acceptable procedures. 4.3.4 Freeboard allowances. 4.4 Stability investigations. 4.4.1 Foundation and material investigations. 4.4.2 Stability assessment. 4.4.2.1 Seismic stability. 4.4.2.2 Clay shale foundation. 4.4.3 Embankment dams. 4.4.3.1 Liquefaction. 4.4.3.2 Shear failure. 4.4.3.3 Loading conditions. 4.4.3.4 Safety factors. 4.4.3.5 Seepage failure. 4.4.3.6 Seepage analyses. 4.4.4 Concrete dams and appurtenant structures. 4.4.4.1 Requirements for stability. 4.4.4.2 Loads. 4.4.4.3 Stresses. 4.4.4.4 Overturning. 4.4.4.5 Sliding. 4.4.4.5.1 Sliding resistance. 4.4.4.5.2 Downstream resistance. 4.4.4.5.3 Safety factor. Chapter 5—Reports 5.1 General. 5.2 Preparation of report. 5.2.1 Phase I reports. 5.2.2 Phase II reports. Tables Table 1 Size classification. 2 Hazard potential classification. 3 Hydrologic evaluation guidelines. 4 Factors of safety (embankment dams). Figures Fig. 1 Seismic zone map of contiguous States. 2 Seismic zone map of California, Nevada and Arizona. 3 Seismic zone map of Alaska. 4 Seismic zone map of Hawaii. 5 Design envelope for Case I (Table 4). 6 Design envelope for Cases II and III (Table 4). Appendixes Appendix I to App. D—Engineering data Appendix II to App. D—Inspection items Appendix III to App. D—Pub. L. 92-367 Chapter 1—Introduction
1.1. Purpose. This document provides recommended guidelines for the inspection and evaluation of dams to determine if they constitute hazards to human life or property.
1.2. Applicability. The procedures and guidelines outlined in this document apply to the inspection and evaluation of all dams as defined in the National Dam Inspection Act, Public Law 92-367. Included in this program are all artificial barriers together with appurtenant works which impound or divert water and which (1) are twenty-five feet or more in height or (2) have an impounding capacity of fifty acre-feet or more. Not included are barriers which are six feet or less in height, regardless of storage capacity, or barriers which have a storage capacity at maximum water storage elevation of fifteen acre-feet or less regardless of height.
1.3. Authority. The Dam Inspection Act, Public Law 92-367 (Appendix III), authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of safety inspection of dams throughout the United States. The Chief of Engineers issues these guidelines pursuant to that authority.
Chapter 2—General Requirements
2.1. Classification of dams. Dams should be classified in accordance with size and hazard potential in order to formulate a priority basis for selecting dams to be included in the inspection program and also to provide compatibility between guideline requirements and involved risks. When possible the initial classifications should be based upon information listed in the National Inventory of Dams with respect to size, impoundment capacity and hazard potential. It may be necessary to reclassify dams when additional information becomes available.
2.1.1. Size. The classification for size based on the height of the dam and storage capacity should be in accordance with Table 1. The height of the dam is established with respect to the maximum storage potential measured from the natural bed of the stream or watercourse at the downstream toe of the barrier, or if it is not across a stream or watercourse, the height from the lowest elevation of the outside limit of the barrier, to the maximum water storage elevation. For the purpose of determining project size, the maximum storage elevation may be considered equal to the top of dam elevation. Size classification may be determined by either storage or height, whichever gives the larger size category.
Table 1—Size Classification
Category | Impoundment
Storage (ac-ft) | Height (ft)
Small | <1,000 and ≥50 | <40 and ≥25.
Intermediate | ≥1,000 and <50,000 | ≥40 and <100.
Large | ≥50,000 | ≥100.
2.1.2. Hazard Potential. The classification for potential hazards should be in accordance with Table 2. The hazards pertain to potential loss of human life or property damage in the area downstream of the dam in event of failure or misoperation of the dam or appurtenant facilities. Dams conforming to criteria for the low hazard potential category generally will be located in rural or agricultural areas where failure may damage farm buildings, limited agricultural land, or township and country roads. Significant hazard potential category structures will be those located in predominantly rural or agricultural areas where failure may damage isolated homes, secondary highways or minor railroads or cause interruption of use or service of relatively important public utilities. Dams in the high hazard potential category will be those located where failure may cause serious damage to homes, extensive agricultural, industrial and commercial facilities, important public utilities, main highways, or railroads.
Table 2—Hazard Potential Classification
Category | Loss of life (extent of development) | Economic loss (extent of development)
Low | None expected (No permanent structures for human habitation) | Minimal (Undeveloped to occasional structures or agriculture).
Significant | Few (No urban developments and no more than a small number of inhabitable structures) | Appreciable (Notable agriculture, industry or structures).
High | More than few | Excessive (Extensive community, industry or agriculture).
2.2. Selection of dams to be investigated. The selection of dams to be investigated should be based upon an assessment of existing developments in flood hazard areas. Those dams possessing a hazard potential classified high or significant as indicated in Table 2 should be given first and second priorities, respectively, in the inspection program. Inspection priorities within each category may be developed from a consideration of factors such as size classification and age of the dam, the population size in the downstream flood area, and potential developments anticipated in flood hazard areas.
2.3. Technical Investigations. A detailed, systematic, technical inspection and evaluation should be made of each dam selected for investigation in which the hydraulic and hydrologic capabilities, structural stability and operational adequacy of project features are analyzed and evaluated to determine if the dam constitutes a danger to human life or property. The investigation should vary in scope and completeness depending upon the availability and suitability of engineering data, the validity of design assumptions and analyses and the condition of the dam. The minimum investigation will be designated Phase I, and an in-depth investigation designated Phase II should be made where deemed necessary. Phase I investigations should consist of a visual inspection of the dam, abutments and critical appurtenant structures, and a review of readily available engineering data. It is not intended to perform costly explorations or analyses during Phase I. Phase II investigations should consist of all additional engineering investigations and analyses found necessary by results of the Phase I investigation.
2.4. Qualifications of investigators. The technical investigations should be conducted under the direction of licensed professional engineers experienced in the investigation, design, construction and operation of dams, applying the disciplines of hydrologic, hydraulic, soils and structural engineering and engineering geology. All field inspections should be conducted by qualified engineers, engineering geologists and other specialists, including experts on mechanical and electrical operation of gates and controls, knowledgeable in the investigation, design, construction and operation of dams.
Chapter 3—Phase I Investigation
3.1. Purpose. The primary purpose of the Phase I investigation program is to identify expeditiously those dams which may pose hazards to human life or property.
3.2. Scope. The Phase I investigation will develop an assessment of the general condition with respect to safety of the project based upon available data and a visual inspection, determine any need for emergency measures and conclude if additional studies, investigation and analyses are necessary and warranted. A review will be made of pertinent existing and available engineering data relative to the design, construction and operation of the dam and appurtenant structures, including electrical and mechanical operating equipment and measurements from inspection and performance instruments and devices; and a detailed systematic visual inspection will be performed of those features relating to the stability and operational adequacy of the project. Based upon findings of the review of engineering data and the visual inspection, an evaluation will be made of the general condition of the dam, including where possible the assessment of the hydraulic and hydrologic capabilities and the structural stability.
3.3. Engineering data. To the extent feasible the engineering data listed in Appendix I relating to the design, construction and operation of the dam and appurtenant structures, should be collected from existing records and reviewed to aid in evaluating the adequacy of hydraulic and hydrologic capabilities and stability of the dam. Where the necessary engineering data are unavailable, inadequate or invalid, a listing should be made of those specific additional data deemed necessary by the engineer in charge of the investigation and included in the Phase I report.
3.4. Field inspections. The field inspection of the dam, appurtenant stuctures, reservoir area, and downstream channel in the vicinity of the dam should be conducted in a systematic manner to minimize the possibility of any significant feature being overlooked. A detailed checklist should be developed and followed for each dam inspected to document the examination of each significant structural and hydraulic feature including electrical and mechanical equipment for operation of the control facilities that affect the safety of the dam.
3.4.1. Particular attention should be given to detecting evidence of leakage, erosion, seepage, slope instability, undue settlement, displacement, tilting, cracking, deterioration, and improper functioning of drains and relief wells. The adequacy and quality of maintenance and operating procedures as they pertain to the safety of the dam and operation of the control facilities should also be assessed.
3.4.2. Photographs and drawings should be used freely to record conditions in order to minimize descriptions.
3.4.3. The field inspection should include appropriate features and items, including but not limited to those listed in Appendix II, which may influence the safety of the dam or indicate potential hazards to human life or property.
3.5. Evaluation of hydraulic and hydrologic Features.
3.5.1. Design data. Original hydraulic and hydrologic design assumptions obtained from the project records should be assessed to determine their acceptability in evaluating the safety of the dam. All constraints on water control such as blocked entrances, restrictions on operation of spillway and outlet gates, inadequate energy dissipators or restrictive channel conditions, significant reduction in reservoir capacity by sediment deposits and other factors should be considered in evaluating the validity of discharge ratings, storage capacity, hydrographs, routings and regulation plans. The discharge capacity and/or storage capacity should be capable of safely handling the recommended spillway design flood for the size and hazard potential classification of the dam as indicated in Table 3. The hydraulic and hydrologic determinations for design as obtained from project records will be acceptable if conventional techniques similar to the procedures outlined in paragraph 4.3. were used in obtaining the data. When the project design flood actually used exceeds the recommended spillway design flood, from Table 3, the project design flood will be acceptable in evaluating the safety of the dam.
Table 3—Hydrologic Evaluation Guidelines
[Recommended spillway design floods]
Hazard | Size | Spillway design flood (SDF) 1
Low | Small | 50 to 100-yr frequency.
Intermediate | 100-yr to 1/2 PMF.
Large | 1/2 PMF to PMF.
Significant | Small | 100-yr to 1/2 PMF.
Intermediate | 1/2 PMF to PMF.
Large | PMF.
High | Small | 1/2 PMF to PMF.
Intermediate | PMF.
Large | PMF.
1 The recommended design floods in this column represent the magnitude of the spillway design flood (SDF), which is intended to represent the largest flood that need be considered in the evaluation of a given project, regardless of whether a spillway is provided; i.e., a given project should be capable of safely passing the appropriate SDF. Where a range of SDF is indicated, the magnitude that most closely relates to the involved risk should be selected.
1000-yr = 100-Year Exceedence Interval. The flood magnitude expected to be exceeded, on the average, of once in 100 years. It may also be expressed as an exceedence frequency with a one-percent chance of being exceeded in any given year. PMF = Probable Maximum Flood. The flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The PMF is derived from probable maximum precipitation (PMP), which information is generally available from the National Weather Service, NOAA. Most Federal agencies apply reduction factors to the PMP when appropriate. Reductions may be applied because rainfall isohyetals are unlikely to conform to the exact shape of the drainage basin and/or the storm is not likely to center exactly over the drainage basin. In some cases local topography will cause changes from the generalized PMP values, therefore it may be advisable to contact Federal construction agencies to obtain the prevailing practice in specific areas.
3.5.2. Experience data. In some cases where design data are lacking, an evaluation of overtopping potential may be based on watershed characteristics and rainfall and reservoir records. An estimate of the probable maximum flood may also be developed from a conservative, generalized comparison of the drainage area size and the magnitude of recently adopted probable maximum floods for damsites in comparable hydrologic regions. Where the review of such experience data indicates that the recommended spillway design flood would not cause overtopping additional hydraulic and hydrologic determinations will be unnecessary.
3.6. Evaluation of structural stability. The Phase I evaluations of structural adequacy of project features are expected to be based principally on existing conditions as revealed by the visual inspection, together with available design and construction information and records of performance. The objectives are to determine the existence of conditions which are hazardous, or which with time might develop into safety hazards, and to formulate recommendations pertaining to the need for any additional studies, investigations, or analyses. The results of this phase of the inspection must rely very substantially upon the experience and judgment of the inspecting engineer.
3.6.1. Design and construction data. The principal design assumptions and analyses obtained from the project records should be assessed. Original design and construction records should be used judiciously, recognizing the restricted applicability of such data as material strengths and permeabilities, geological factors and construction descriptions. Original stability studies and analyses should be acceptable if conventional techniques and procedures similar to those outlined in paragraph 4.4 were employed, provided that review of operational and performance data confirm that the original design assumptions were adequately conservative. The need for such analyses where either none exist or the originals are incomplete or unsatisfactory will be determined by the inspecting engineer based upon other factors such as condition of structures, prior maximum loadings and the hazard degree of the project. Design assumptions and analyses should include all applicable loads including earthquake and indicate the structure's capability to resist overturning, sliding and overstressing with adequate factors of safety. In general seepage and stability analyses comparable to the requirements of paragraph 4.4 should be on record for all dams in the high hazard category and large dams in the significant hazard category. This requirement for other dams will be subject to the opinion of the inspecting engineer.
3.6.2. Operating records. The performance of structures under prior maximum loading conditions should in some instances provide partial basis for stability evaluation. Satisfactory experience under loading conditions not expected to be exceeded in the future should generally be indicative of satisfactory stability, provided adverse changes in physical conditions have not occurred. Instrumentation observations of forces, pressures, loads, stresses, strains, displacements, deflections or other related conditions should also be utilized in the safety evaluation. Where such data indicate abnormal behavior, unsafe movement or deflections, or loadings which adversely affect the stability or functioning of the structure, prompt reporting of such circumstances is required without the delay for preparation of the official inspection report.
3.6.3. Post construction changes. Data should be collected on changes which have occurred since project construction that might influence the safety of the dam such as road cuts, quarries, mining and groundwater changes.
3.6.4. Seismic stability. An assessment should be made of the potential vulnerability of the dam to seismic events and a recommendation developed with regard to the need for additional seismic investigation. In general, projects located in Seismic Zones 0, 1 and 2 may be assumed to present no hazard from earthquake provided static stability conditions are satisfactory and conventional safety margins exist. Dams in Zones 3 and 4 should, as a minimum, have on record suitable analyses made by conventional equivalent static load methods. The seismic zones together with appropriate coefficients for use in such analyses are shown in Figures 1 through 4. Boundary lines are approximate and in the event of doubt about the proper zone, the higher zone should be used. All high hazard category dams in Zone 4 and high hazard dams of the hydraulic fill type in Zone 3 should have a stability assessment based upon knowledge of regional and local geology, engineering seismology, in situ properties of materials and appropriate dynamic analytical and testing procedures. The assessment should include the possibility of physical displacement of the structures due to movements along active faults. Departure from this general guidance should be made whenever in the judgment of the investigating engineer different seismic stability requirements are warranted because of local geological conditions or other reasons.
Chapter 4—Phase II Investigation
4.1. Purpose. The Phase II investigation will be supplementary to Phase I and should be conducted when the results of the Phase I investigation indicate the need for additional in-depth studies, investigations or analyses.
4.2. Scope. The Phase II investigation should include all additional studies, investigations and analyses necessary to evaluate the safety of the dam. Included, as required, will be additional visual inspections, measurements, foundation exploration and testing, materials testing, hydraulic and hydrologic analysis and structural stability analyses.
4.3. Hydraulic and hydrologic analysis. Hydraulic and hydrologic capabilities should be determined using the following criteria and procedures. Depending on the project characteristics, either the spillway design flood peak inflow or the spillway design flood hydrograph should be the basis for determining the maximum water surface elevation and maximum outflow. If the operation or failure of upstream water control projects would have significant impact on peak flow or hydrograph analyses, the impact should be assessed.
4.3.1. Maximum water surface based on SDF peak inflow. When the total project discharge capability at maximum pool exceeds the peak inflow of the recommended SDF, and operational constraints would not prevent such a release at controlled projects, a reservoir routing is not required. The maximum discharge should be assumed equal to the peak inflow of the spillway design flood. Flood volume is not controlling in this situation and surcharge storage is either absent or is significant only to the extent that it provides the head necessary to develop the release capability required.
4.3.1.1. Peak for 100-year flood. When the 100-year flood is applicable under the provisions of Table 3 and data are available, the spillway design flood peak inflow may be determined by use of “A Uniform Technique for Determining Flood Frequencies,” Water Resources Council (WRC), Hydrology Committee, Bulletin 15, December 1967. Flow frequency information from regional analysis is generally preferred over single station results when available and appropriate. Rainfall-runoff techniques may be necessary when there are inadequate runoff data available to make a reasonable estimate of flow frequency.
4.3.1.2. Peak for PMF or fraction thereof. When either the Probable Maximum Flood peak or a fraction thereof is applicable under the provisions of Table 3, the unit hydrograph—infiltration loss technique is generally the most expeditious method of computing the spillway design flood peak for most projects. This technique is discussed in the following paragraph.
4.3.2. Maximum water surface based on SDF hydrograph. Both peak and volume are required in this analysis. Where surcharge storage is significant, or where there is insufficient discharge capability at maximum pool to pass the peak inflow of the SDF, considering all possible operational constraints, a flood hydrograph is required. When there are upstream hazard areas that would be imperiled by fast rising reservoirs levels, SDF hydrographs should be routed to ascertain available time for warning and escape. Determination of probable maximum precipitation or 100-year precipitation, which ever is applicable, and unit hydrographs or runoff models will be required, followed by the determination of the PMF or 100-year flood. Conservative loss rates (significantly reduced by antecedent rainfall conditions where appropriate) should be estimated for computing the rainfall excess to be utilized with unit hydrographs. Rainfall values are usually arranged with gradually ascending and descending rates with the maximum rate late in the storm. When applicable, conservatively high snowmelt runoff rates and appropriate releases from upstream projects should be assumed. The PMP may be obtained from National Weather Service (NWS) publications such as Hydrometeorological Report (HMR) 33. Special NWS publications for particular areas should be used when available. Rainfall for the 100-year frequency flood can be obtained from the NWS publication “Rainfall Frequency Atlas of the United States,” Technical Paper No. 40; Atlas 2, “Precipitation Frequency Atlas of Western United States;” or other NWS publications. The maximum water surface elevation and spillway design flood outflow are then determined by routing the inflow hydrograph through the reservoir surcharge storage, assuming a starting water surface at the bottom of surcharge storage, or lower when appropriate. For projects where the bottom of surcharge space is not distinct, or the flood control storage space (exclusive of surcharge) is appreciable, it may be appropriate to select starting water surface elevations below the top of the flood control storage for routings. Conservatively high starting levels should be estimated on the basis of hydrometeorological conditions reasonably characteristic for the region and flood release capability of the project. Necessary adjustment of reservoir storage capacity due to existing or future sediment or other encroachment may be approximated when accurate determination of deposition is not practicable.
4.3.3. Acceptable procedures. Techniques for performing hydraulic and hydrologic analyses are generally available from publications prepared by Federal agencies involved in water resources development or textbooks written by the academic community. Some of these procedures are rather sophisticated and require expensive computational equipment and large data banks. While results of such procedures are generally more reliable than simplified methods, their use is generally not warranted in studies connected with this program unless they can be performed quickly and inexpensively. There may be situations where the more complex techniques have to be employed to obtain reliable results; however, these cases will be exceptions rather than the rule. Whenever the acceptability of procedures is in question, the advice of competent experts should be sought. Such expertise is generally available in the Corps of Engineers, Bureau of Reclamation and Soil Conservation Service. Many other agencies, educational facilities and private consultants can also provide expert advice. Regardless of where such expertise is based, the qualification of those individuals offering to provide it should be carefully examined and evaluated.
4.3.4. Freeboard allowances. Guidelines on specific minimum freeboard allowances are not considered appropriate because of the many factors involved in such determinations. The investigator will have to assess the critical parameters for each project and develop its minimum requirement. Many projects are reasonably safe without freeboard allowance because they are designed for overtopping, or other factors minimize possible overtopping. Conversely, freeboard allowances of several feet may be necessary to provide a safe condition. Parameters that should be considered include the duration of high water levels in the reservoir during the design flood; the effective wind fetch and reservoir depth available to support wave generation; the probability of high wind speed occurring from a critical direction; the potential wave runup on the dam based on roughness and slope; and the ability of the dam to resist erosion from overtopping waves.
4.4 Stability investigations. The Phase II stability investigations should be compatible with the guidelines of this paragraph.
4.4.1 Foundation and material investigations. The scope of the foundation and materials investigation should be limited to obtaining the information required to analyze the structural stability and to investigate any suspected condition which would adversely affect the safety of the dam. Such investigations may include borings to obtain concrete, embankment, soil foundation, and bedrock samples; testing specimens from these samples to determine the strength and elastic parameters of the materials, including the soft seams, joints, fault gouge and expansive clays or other critical materials in the foundation; determining the character of the bedrock including joints, bedding planes, fractures, faults, voids and caverns, and other geological irregularities; and installing instruments for determining movements, strains, suspected excessive internal seepage pressures, seepage gradients and uplift forces. Special investigations may be necessary where suspect rock types such as limestone, gypsum, salt, basalt, claystone, shales or others are involved in foundations or abutments in order to determine the extent of cavities, piping or other deficiencies in the rock foundation. A concrete core drilling program should be undertaken only when the existence of significant structural cracks is suspected or the general qualitative condition of the concrete is in doubt. The tests of materials will be necessary only where such data are lacking or are outdated.
4.4.2. Stability assessment. Stability assessments should utilize in situ properties of the structure and its foundation and pertinent geologic information. Geologic information that should be considered includes groundwater and seepage conditions; lithology, stratigraphy, and geologic details disclosed by borings, “as-built” records, and geologic interpretation; maximum past overburden at site as deduced from geologic evidence; bedding, folding and faulting; joints and joint systems; weathering; slickensides, and field evidence relating to slides, faults, movements and earthquake activity. Foundations may present problems where they contain adversely oriented joints, slickensides or fissured material, faults, seams of soft materials, or weak layers. Such defects and excess pore water pressures may contribute to instability. Special tests may be necessary to determine physical properties of particular materials. The results of stability analyses afford a means of evaluating the structure's existing resistance to failure and also the effects of any proposed modifications. Results of stability analyses should be reviewed for compatibility with performance experience when possible.
4.4.2.1. Seismic stability. The inertial forces for use in the conventional equivalent static force method of analysis should be obtained by multiplying the weight by the seismic coefficient and should be applied as a horizontal force at the center of gravity of the section or element. The seismic coefficients suggested for use with such analyses are listed in Figures 1 through 4. Seismic stability investigations for all high hazard category dams located in Seismic Zone 4 and high hazard dams of the hydraulic fill type in Zone 3 should include suitable dynamic procedures and analyses. Dynamic analyses for other dams and higher seismic coefficients are appropriate if in the judgment of the investigating engineer they are warranted because of proximity to active faults or other reasons. Seismic stability investigations should utilize “state-of-the-art” procedures involving seismological and geological studies to establish earthquake parameters for use in dynamic stability analyses and, where appropriate, the dynamic testing of materials. Stability analyses may be based upon either time-history or response spectra techniques. The results of dynamic analyses should be assessed on the basis of whether or not the dam would have sufficient residual integrity to retain the reservoir during and after the greatest or most adverse earthquake which might occur near the project location.
4.4.2.2. Clay shale foundation. Clay shale is a highly overconsolidated sedimentary rock comprised predominantly of clay minerals, with little or no cementation. Foundations of clay shales require special measures in stability investigations. Clay shales, particularly those containing montmorillonite, may be highly susceptible to expansion and consequent loss of strength upon unloading. The shear strength and the resistance to deformation of clay shales may be quite low and high pore water pressures may develop under increase in load. The presence of slickensides in clay shales is usually an indication of low shear strength. Prediction of field behavior of clay shales should not be based solely on results of conventional laboratory tests since they may be misleading. The use of peak shear strengths for clay shales in stability analyses may be unconservative because of nonuniform stress distribution and possible progressive failures. Thus the available shear resistance may be less than if the peak shear strength were mobilized simultaneously along the entire failure surface. In such cases, either greater safety factors or residual shear strength should be used.
4.4.3. Embankment dams.
4.4.3.1. Liquefaction. The phenomenon of liquefaction of loose, saturated sands and silts may occur when such materials are subjected to shear deformation or earthquake shocks. The possibility of liquefaction must presently be evaluated on the basis of empirical knowledge supplemented by special laboratory tests and engineering judgment. The possibility of liquefaction in sands diminishes as the relative density increases above approximately 70 percent. Hydraulic fill dams in Seismic Zones 3 and 4 should receive particular attention since such dams are susceptible to liquefaction under earthquake shocks.
4.4.3.2. Shear failure. Shear failure is one in which a portion of an embankment or of an embankment and foundation moves by sliding or rotating relative to the remainder of the mass. It is conventionally represented as occurring along a surface and is so assumed in stability analyses, although shearing may occur in a zone of substantial thickness. The circular arc or the sliding wedge method of analyzing stability, as pertinent, should be used. The circular arc method is generally applicable to essentially homogeneous embankments and to soil foundations consisting of thick deposits of fine-grained soil containing no layers significantly weaker than other strata in the foundation. The wedge method is generally applicable to rockfill dams and to earth dams on foundations containing weak layers. Other methods of analysis such as those employing complex shear surfaces may be appropriate depending on the soil and rock in the dam and foundation. Such methods should be in reputable usage in the engineering profession.
4.4.3.3. Loading conditions. The loading conditions for which the embankment structures should be investigated are (I) Sudden drawdown from spillway crest elevation or top of gates, (II) Partial pool, (III) Steady state seepage from spillway crest elevation or top of gate elevation, and (IV) Earthquake. Cases I and II apply to upstream slopes only; slopes; and Case IV applies to both upstream and downstream Case III applies to downstream slopes. A summary of suggested strengths and safety factors are shown in Table 4.
Table 4—Factors of Safety 1
Case and loading condition | Factor of safety | Shear 2 strength | Remarks
I Sudden drawdown from spillway crest or top of gates to minimum drawdown elevation | 3 1.2 | Minimum composite of R and S shear strengths. See Figure 5 | Within the drawdown zone submerged unit weights of materials are used for computing forces resisting sliding and saturated unit weights are used for computing forces contributing to sliding.
II Partial pool with assumed horizontal steady seepage saturation | 1.5 | R + S/2 for R<S S for R>S | Composite intermediate envelope of R and S shear strengths. See Figure 6.
III Steady seepage from spillway crest or top of gates with Kh/Kv = 9 assumed 4 | 1.5 | Same as Case II
IV Earthquake (Cases II and III with seismic loading) | 1.0 | ( 5 ) | See Figures 1 through 4 for Seismic Coefficients.
1 Not applicable to embankments on clay shale foundation. Experience has indicated special problems in determination of design shear strengths for clay shale foundations and acceptable safety factors should be compatible with the confidence level in shear strength assumptions.
2 Other strength assumptions may be used if in common usage in the engineering profession.
3 The safety factor should not be less than 1.5 when drawdown rate and pore water pressure developed from flow nets are used in stability analyses.
4 Kh/Kv is the ratio of horizontal to vertical permeability. A minimum of 9 is suggested for use in compacted embankments and alluvial sediments.
5 Use shear strength for case analyzed without earthquake. It is not necessary to analyze sudden drawdown for earthquake loading. Shear strength tests are classified according to the controlled drainage conditions maintained during the test. R tests are those in which specimen drainage is allowed during consolidation (or swelling) under initial stress conditions, but specimen drainage is not allowed during application of shearing stresses. S tests allow full drainage during initial stress application and shearing is at a slow rate so that complete specimen drainage is permitted during the complete test.
4.4.3.4. Safety factors. Safety factors for embankment dam stability studies should be based on the ratio of available shear strength to developed shear strength, SD:
Where: C = Cohesion φ = Angle of internal friction σ = Normal stress
The factors of safety listed in Table 4 are recommended as minimum acceptable. Final accepted factors of safety should depend upon the degree of confidence the investigating engineer has in the engineering data available to him. The consequences of a failure with respect to human life and property damage are important considerations in establishing factors of safety for specific investigations.
4.4.3.5. Seepage failure. A critical uncontrolled underseepage or through seepage condition that develops during a rising pool can quickly reduce a structure which was stable under previous conditions, to a total structural failure. The visually confirmed seepage conditions to be avoided are (1) the exit of the phreatic surface on the downstream slope of the dam and (2) development of hydrostatic heads sufficient to create in the area downstream of the dam sand boils that erode materials by the phenomenon known as “piping” and (3) localized concentrations of seepage along conduits or through pervious zones. The dams most susceptible to seepage problems are those built of or on pervious materials of uniform fine particle size, with no provisions for an internal drainage zone and/or no underseepage controls.
4.4.3.6. Seepage analyses. Review and modifications to original seepage design analyses should consider conditions observed in the field inspection and piezometer instrumentation. A seepage analysis should consider the permeability ratios resulting from natural deposition and from compaction placement of materials with appropriate variation between horizontal and vertical permeability. An underseepage analysis of the embankment should provide a critical gradient factor of safety for the maximum head condition of not less than 1.5 in the area downstream of the embankment.
Where: ic = Critical gradient i = Design gradient H = Uplift head at downstream toe of dam measured above tailwater Hc = The critical uplift Db = The thickness of the top impervious blanket at the downstream toe of the dam γm = The estimated saturated unit weight of the material in the top impervious blanket γw = The unit weight of water
Where a factor of safety less than 1.5 is obtained the provision of an underseepage control system is indicated. The factor of safety of 1.5 is a recommended minimum and may be adjusted by the responsible engineer based on the competence of the engineering data.
4.4.4. Concrete dams and appurtenant structures.
4.4.4.1. Requirements for stability. Concrete dams and structures appurtenant to embankment dams should be capable of resisting overturning, sliding and overstressing with adequate factors of safety for normal and maximum loading conditions.
4.4.4.2. Loads. Loadings to be considered in stability analyses include the water load on the upstream face of the dam; the weight of the structure; internal hydrostatic pressures (uplift) within the body of the dam, at the base of the dam and within the foundation; earth and silt loads; ice pressure, seismic and thermal loads, and other loads as applicable. Where tailwater or backwater exists on the downstream side of the structure it should be considered, and assumed uplift pressures should be compatible with drainage provisions and uplift measurements if available. Where applicable, ice pressure should be applied to the contact surface of the structure of normal pool elevation. A unit pressure of not more than 5,000 pounds per square foot should be used. Normally, ice thickness should not be assumed greater than two feet. Earthquake forces should consist of the inertial forces due to the horizontal acceleration of the dam itself and hydrodynamic forces resulting from the reaction of the reservoir water against the structure. Dynamic water pressures for use in a conventional methods of analysis may be computed by means of the “Westergaard Formula” using the parabolic approximation (H.M. Westergaard, “Water Pressures on Dams During Earthquakes,” Trans., ASCE, Vol 98, 1933, pages 418-433), or similar method.
4.4.4.3. Stresses. The analysis of concrete stresses should be based on in situ properties of the concrete and foundation. Computed maximum compressive stresses for normal operating conditions in the order of 1/3 or less of in situ strengths should be satisfactory. Tensile stresses in unreinforced concrete should be acceptable only in locations where cracks will not adversely affect the overall performance and stability of the structure. Foundation stresses should be such as to provide adequate safety against failure of the foundation material under all loading conditions.
4.4.4.4. Overturning. A gravity structure should be capable of resisting all overturning forces. It can be considered safe against overturning if the resultant of all combinations of horizontal and vertical forces, excluding earthquake forces, acting above any horizontal plane through the structure or at its base is located within the middle third of the section. When earthquake is included the resultant should fall within the limits of the plane or base, and foundation pressures must be acceptable. When these requirements for location of the resultant are not satisfied the investigating engineer should assess the importance to stability of the deviations.
4.4.4.5. Sliding. Sliding of concrete gravity structures and of abutment and foundation rock masses for all types of concrete dams should be evaluated by the shear-friction resistance concept. The available sliding resistance is compared with the driving force which tends to induce sliding to arrive at a sliding stability safety factor. The investigation should be made along all potential sliding paths. The critical path is that plane or combination of planes which offers the least resistance.
4.4.4.5.1. Sliding resistance. Sliding resistance is a function of the unit shearing strength at no normal load (cohesion) and the angle of friction on a potential failure surface. It is determined by computing the maximum horizontal driving force which could be resisted along the sliding path under investigation. The following general formula is obtained from the principles of statics and may be derived by resolving forces parallel and perpendicular to the sliding plane:
Where: RR = Sliding Resistance (maximum horizontal driving force which can be resisted by the critical path) φ = Angle of internal friction of foundation material or, where applicable, angle of sliding friction V = Summation of vertical forces (including uplift) c = Unit shearing strength at zero normal loading along potential failure plane A = Area of potential failure plane developing unit shear strength “c” α = Angle between inclined plane and horizontal (positive for uphill sliding)
For sliding downhill the angle α is negative and Equation (1) becomes:
When the plane of investigation is horizontal, and the angle α is zero and Equation (1) reduced to the following:
4.4.4.5.2. Downstream resistance. When the base of a concrete structure is embedded in rock or the potential failure plane lies below the base, the passive resistance of the downstream layer of rock may sometimes be utilized for sliding resistance. Rock that may be subjected to high velocity water scouring should not be used. The magnitude of the downstream resistance is the lesser of (a) the shearing resistance along the continuation of the potential sliding plane until it daylights or (b) the resistance available from the downstream rock wedge along an inclined plane. The theoretical resistance offered by the passive wedge can be computed by a formula equivalent to formula (3):
Where: Pp = Passive resistance of rock wedge W = Weight (buoyant weight if applicable) of downstream rock wedge above inclined plane of resistance, plus any superimposed loads φ = Angle of internal friction or, if applicable, angle of sliding friction α = Angle between inclined failure plane and horizontal c = Unit shearing strength at zero normal load along failure plane A = Area of inclined plane of resistance
When considering cross-bed shear through a relatively shallow, competent rock strut, without adverse jointing or faulting, W and α may be taken at zero and 45°, respectively, and an estimate of passive wedge resistance per unit width obtained by the following equation:
Where: D = Thickness of the rock strut
4.4.4.5.3. Safety factor. The shear-friction safety factor is obtained by dividing the resistance RR by H, the summation of horizontal service loads to be applied to the structure:
When the downstream passive wedge contributes to the sliding resistance, the shear friction safety factor formula becomes:
The above direct superimposition of passive wedge resistance is valid only if shearing rigidities of the foundation components are similar. Also, the compressive strength and buckling resistance of the downstream rock layer must be sufficient to develop the wedge resistance. For example, a foundation with closely spaced, near horizontal, relatively weak seams might not contain sufficient buckling strength to develop the magnitude of wedge resistance computed from the cross-bed shear strength. In this case wedge resistance should not be assumed without resorting to special treatment (such as installing foundation anchors). Computed sliding safety factors approximating 3 or more for all loading conditions without earthquake, and 1.5 including earthquake, should indicate satisfactory stability, depending upon the reliability of the strength parameters used in the analyses. In some cases when the results of comprehensive foundation studies are available, smaller safety factors may be acceptable. The selection of shear strength parameters should be fully substantiated. The bases for any assumptions; the results of applicable testing, studies and investigations; and all pre-existing, pertinent data should be reported and evaluated.
Chapter 5—Reports
5.1. General. This chapter outlines the procedures for reporting the results of the technical investigations. Hazardous conditions should be reported immediately upon detection to the owner of the dam, the Governor of the State in which the dam is located and the appropriate regulatory agency without delay for preparation of the formal report.
5.2. Preparation of report. A formal report should be prepared for each dam investigated for submission to the regulatory agency and the owner of the dam. Each report should contain the information indicated in the following paragraphs. The signature and registration identification of the professional engineer who directed the investigation and who was responsible for evaluation of the dam should be included in the report.
5.2.1. Phase I reports. Phase I reports should contain the following information:
5.2.1.1. Description of dam including regional vicinity map showing location and plans, elevations and sections showing the essential project features and the size and hazard potential classifications.
5.2.1.2. Summary of existing engineering data, including geologic maps and information.
5.2.1.3. Results of the visual inspection of each project feature including photographs and drawings to minimize descriptions.
5.2.1.4. Evaluation of operational adequacy of the reservoir regulation plan and maintenance of the dam and operating facilities and features that pertain to the safety of the dam.
5.2.1.5. Description of any warning system in effect.
5.2.1.6. Evaluation of the hydraulic and hydrologic assumptions and structural stability.
5.2.1.7. An assessment of the general condition of the dam with respect to safety based upon the findings of the visual inspection and review of engineering data. Where data on the original design indicate significant departure from or non-conformance with guidelines contained herein, the engineer-in-charge of the investigation will give his opinion of the significance, with regard to safety, of such factors. Any additional studies, investigations and analyses considered essential to assessment of the safety of the dam should be listed, together with an opinion about the urgency of such additional work.
5.2.1.8. Indicate alternative possible remedial measures or revisions in operating and maintenance procedures which may (subject to further evaluation) correct deficiencies and hazardous conditions found during the investigation.
5.2.2. Phase II reports. Phase II reports should describe the detailed investigations and should supplement Phase I reports. They should contain the following information:
5.2.2.1. Summary of additional engineering data obtained to determine the hydraulic and hydrologic capabilities and/or structural stability.
5.2.2.2. Results of all additional studies, investigations, and analyses performed.
5.2.2.3. Technical assessment of dam safety including deficiencies and hazardous conditions found to exist.
5.2.2.4. Indicate alternative possible remedial measures or revision in maintenance and operating procedures which may (subject to further evaluation) correct deficiencies and hazardous conditions found during the investigation.
Appendix I to App. D to § 222.6—Engineering Data
This appendix lists engineering data which should be collected from project records and, to the extent available, included in the Phase I investigation report. The list is intended to serve as a checklist and not to establish rigid data requirements. Such a compilation should also facilitate future inspections and investigations. Only data readily available will be included in Phase I reports, but data lacking and deemed necessary for an adequate safety evaluation should be identified.
1. General Project Data.
a. Regional Vicinity Map showing the location of the dam, the upstream drainage area and the downstream area subject to potential damage due to failure of the dam and misoperation or failure of the operating equipment.
b. As-Built Drawings indicating plans, elevations and sections of the dam and appurtenant structures including the details of the discharge facilities such as outlet works, limited service and emergency spillways, flashboards, fuse plugs and operating equipment.
2. Hydrologic and Hydraulic Data including the following:
a. Drainage area and basin runoff characteristics (indicating pending changes).
b. Elevation of top of conservation pool or normal upper retention water surface elevation, as applicable (base level of any flood impoundment).
c. Storage capacity including dead or inactive storage, corresponding to top of conservation or normal upper retention level (cumulative, excluding flood control and surcharge storage).
d. Elevation of the top of flood control pool.
e. Storage capacity of flood control zone (incremental).
f. Elevation of maximum design pool (corresponding to top of surcharge storage or spillway design flood).
g. Storage capacity of surcharge zone (incremental, above top of flood control pool or, above normal upper retention level if flood control space not provided).
h. Height of freeboard (distance between maximum design flood water surface and top of dam).
i. Elevation of top of dam (lowest point of embankment or non-overflow structure).
j. Elevation of crest, type, width, crest length and location of spillways (number, size and type of gates if controlled).
k. Type, location, entrance and exit inverts of outlet works and emergency drawdown facilities (number, size and shape of conduits and gates, including penstocks and sluices).
l. Location, crest elevation, description of invert and abutments (concrete, rock, grass, earth) and length of limited service and emergency spillways.
m. Location and description of flashboards and fuse plugs, including hydraulic head (pool elevation) and other conditions required for breaching, along with the assumed results of breaching.
n. Location and top elevation of dikes and floodwalls (overflow and non-overflow) affected by reservoir. Include information on low reaches of reservoir rim.
o. Type, location, observations and records of hydrometeorological gages appurtenant to the project.
p. Maximum non-damaging discharge, or negligible damage rate, at potential damage locations downstream.
3. Foundation Data and Geological Features including logs of borings, geological maps, profiles and cross sections, and reports of foundation treatment.
4. Properties of Embankments and Foundation Materials including results of laboratory tests, field permeability tests, construction control tests, and assumed design properties for materials.
5. Concrete Properties including the source and type of aggregate, cement used, mix design data and the results of testing during construction.
6. Electrical and Mechanical Equipment type and rating of normal and emergency power supplies, hoists, cranes, valves and valve operator, control and alarm systems and other electrical and mechanical equipment and systems that could affect the safe operation of the dam.
7. Construction History including diversion scheme, construction sequence, pertinent construction problems, alterations, modifications and maintenance repairs.
8. Water Control Plan including regulation plan under normal conditions and during flood events or other emergency conditions. The availability of dam tenders, means of communication between dam tenders and authority supervising water control, and method of gate operation (manual, automatic, or remote control) should be included. Flood warning systems should be described in sufficient detail to enable assessment of their reduction in the flood hazard potential.
9. Operation Record.
a. Summary of past major flood events including any experiences that presented a serious threat to the safety of the project or to human life or property. The critical project feature, date and duration of event, causative factor, peak inflow and outflow, maximum elevation of water surface, wind and wave factors if significant, issuance of alert or evacuation warnings and adequacy of project feature involved should be included in the summary of past experience of serious threat to the safety of the project.
b. Records of performance observations including instrumentation records.
c. List of any known deficiencies that pose a threat to the safety of the dam or to human life or property.
d. History of previous failures or deficiencies and pending remedial measures for correcting known deficiencies and the schedule for accomplishing remedial measures should be indicated.
10. Earthquake History including a summary of the seismic data of significant recorded earthquakes in the vicinity of the dam and information on major damage in the vicinity of the dam from both recorded and unrecorded earthquakes. Regional geologic maps and other documents showing fault locations should be collected.
11. Inspection History including the results of the last safety inspection, the organization that performed the inspection, the date inspection performed and the authority for conducting the inspection.
12. Principal Design Assumptions and Analyses.
a. Hydrologic and Hydraulic Determinations.
(1) Quantity, time and area distribution, and reference source of depth-area-duration data of spillway design storm precipitation (point precipitation if applicable).
(2) Maximum design flood inflow hydrograph including loss rates (initial and average for design flood conditions) and time of runoff concentration of reservoir watershed (peak inflow only when applicable).
(3) Maximum design flood outflow hydrograph (maximum outflow only when applicable).
(4) Discharge-frequency relationship, preferably at damsite, including estimated frequency of spillway design flood for small dams, when appropriate.
(5) Reservoir area and storage capacity versus water surface elevation (table or curves).
(6) Rating curves (free flow and partial gate openings) for all discharge facilities contributing to the maximum design flood outflow hydrograph. Also a composite-rating of all contributing facilities, if appropriate.
(7) Tailwater rating curve immediately below damsite including elevation corresponding to maximum design flood discharge and approximate nondamaging channel capacity.
(8) Hydrologic map of watershed above damsite including reservoir area, watercourse, elevation contours, and principal stream-flow and precipitation gaging stations.
b. Stability and Stress Analysis of the dam, spillway and appurtenant structures and features including the assumed properties of materials and all pertinent applied loads.
c. Seepage and Settlement Analyses. The determination of distribution, direction and magnitude of seepage forces and the design and construction measures for their control. Settlement estimates and steps adopted to compensate for total settlement and to minimize differential settlements.
Appendix II to App. D to § 222.6—Inspection Items
This appendix provides guidance for performing field inspections and may serve as the basis for developing a detailed checklist for each dam.
1. Concrete Structures in General.
a. Concrete Surfaces. The condition of the concrete surfaces should be examined to evaluate the deterioration and continuing serviceability of the concrete. Descriptions of concrete conditions should conform with the appendix to “Guide for Making a Condition Survey of Concrete in Service,” American Concrete Institute (ACI) Journal, Proceedings Vol. 65, No. 11, November 1968, page 905-918.
b. Structural Cracking. Concrete structures should be examined for structural cracking resulting from overstress due to applied loads, shrinkage and temperature effects or differential movements.
c. Movement—Horizontal and Vertical Alignment. Concrete structures should be examined for evidence of any abnormal settlements, heaving, deflections, or lateral movements.
d. Junctions. The conditions at the junctions of the structure with abutments or embankments should be determined.
e. Drains—Foundation, Joint, Face. All drains should be examined to determine that they are capable of performing their design function.
f. Water Passages. All water passages and other concrete surfaces subject to running water should be examined for erosion, cavitation, obstructions, leakage or significant structural cracks.
g. Seepage or Leakage. The faces, abutments and toes of the concrete structures should be examined for evidence of seepage or abnormal leakage, and records of flow of downstream springs reviewed for variation with reservoir pool level. The sources of seepage should be determined if possible.
h. Monolith Joints—Construction Joints. All monolith and construction joints should be examined to determine the condition of the joint and filler material, any movement of joints, or any indication of distress or leakage.
i. Foundation. Foundation should be examined for damage or possible undermining of the downstream toe.
j. Abutments. The abutments should be examined for sign of instability or excessive weathering.
2. Embankment Structures.
a. Settlement. The embankments and downstream toe areas should be examined for any evidence of localized or overall settlement, depressions or sink holes.
b. Slope Stability. Embankment slopes should be examined for irregularities in alignment and variances from smooth uniform slopes, unusual changes from original crest alignment and elevation, evidence of movement at or beyond the toe, and surface cracks which indicate movement.
c. Seepage. The downstream face of abutments, embankment slopes and toes, embankment—structure contacts, and the downstream valley areas should be examined for evidence of existing or past seepage. The sources of seepage should be investigated to determine cause and potential severity to dam safety under all operating conditions. The presence of animal burrows and tree growth on slopes which might cause detrimental seepage should be examined.
d. Drainage Systems. All drainage systems should be examined to determine whether the systems can freely pass discharge and that the discharge water is not carrying embankment or foundation material. Systems used to monitor drainage should be examined to assure they are operational and functioning properly.
e. Slope Protection. The slope protection should be examined for erosion-formed gullies and wave-formed notches and benches that have reduced the embankment cross-section or exposed less wave resistant materials. The adequacy of slope protection against waves, currents, and surface runoff that may occur at the site should be evaluated. The condition of vegetative cover should be evaluated where pertinent.
3. Spillway Structures. Examination should be made of the structures and features including bulkheads, flashboards, and fuse plugs of all service and auxiliary spillways which serve as principal or emergency spillways for any condition which may impose operational constraints on the functioning of the spillway.
a. Control Gates and Operating Machinery. The structural members, connections, hoists, cables and operating machinery and the adequacy of normal and emergency power supplies should be examined and tested to determine the structural integrity and verify the operational adequacy of the equipment. Where cranes are intended to be used for handling gates and bulkheads, the availability, capacity and condition of the cranes and lifting beams should be investigated. Operation of control systems and protective and alarm devices such as limit switches, sump high water alarms and drainage pumps should be investigated.
b. Unlined Saddle Spillways. Unlined saddle spillways should be examined for evidence of erosion and any conditions which may impose constraints on the functioning of the spillway. The ability of the spillway to resist erosion due to operation and the potential hazard to the safety of the dam from such operation should be determined.
c. Approach and Outlet Channels. The approach and outlet channels should be examined for any conditions which may impose constraints on the functioning of the spillway and present a potential hazard to the safety of the dam.
d. Stilling Basin (Energy Dissipators). Stilling basins including baffles, flip buckets or other energy dissipators should be examined for any conditions which may pose constraints on the ability of the stilling basin to prevent downstream scour or erosion which may create or present a potential hazard to the safety of the dam. The existing condition of the channel downstream of the stilling basin should be determined.
4. Outlet Works. The outlet works examination should include all structures and features designed to release reservoir water below the spillway crest through or around the dam.
a. Intake Structure. The structure and all features should be examined for any conditions which may impose operational constraints on the outlet works. Entrances to intake structure should be examined for conditions such as silt or debris accumulation which may reduce the discharge capabilities of the outlet works.
b. Operating and Emergency Control Gates. The structural members, connections, guides, hoists, cables and operating machinery including the adequacy of normal and emergency power supplies should be examined and tested to determine the structural integrity and verify the operational adequacy of the operating and emergency gates, valves, bulkheads, and other equipment.
c. Conduits, Sluices, Water Passages, Etc. The interior surfaces of conduits should be examined for erosion, corrosion, cavitation, cracks, joint separation and leakage at cracks or joints.
d. Stilling Basin (Energy Dissipator). The stilling basin or other energy dissipator should be examined for conditions which may impose any constraints on the ability of the stilling basin to prevent downstream scour or erosion which may create or present a potential hazard to the safety of the dam. The existing condition of the channel downstream of the stilling basin should be determined by soundings.
e. Approach and Outlet Channels. The approach and outlet channels should be examined for any conditions which may impose constraints on the functioning of the discharge facilities of the outlet works, or present a hazard to the safety of the dam.
f. Drawdown Facilities. Facilities provided for drawdown of the reservoir to avert impending failure of the dam or to facilitate repairs in the event of stability or foundation problems should be examined for any conditions which may impose constraints on their functioning as planned.
5. Safety and Performance Instrumentation. Instruments which have been installed to measure behavior of the structures should be examined for proper functioning. The available records and readings of installed instruments should be reviewed to detect any unusual performance of the instruments or evidence of unusual performance or distress of the structure. The adequacy of the installed instrumentation to measure the performance and safety of the dam should be determined.
a. Headwater and Tailwater Gages. The existing records of the headwater and tailwater gages should be examined to determine the relationship between other instrumentation measurements such as stream flow, uplift pressures, alignment, and drainage system discharge with the upper and lower water surface elevations.
b. Horizontal and Vertical Alignment Instrumentation (Concrete Structures). The existing records of alignment and elevation surveys and measurements from inclinometers, inverted plumb bobs, gage points across cracks and joints, or other devices should be examined to determine any change from the original position of the structures.
c. Horizontal and Vertical Movement, Consolidation, and Pore-Water Pressure Instrumentation (Embankment Structures). The existing records of measurements from settlement plates or gages, surface reference marks, slope indicators and other devices should be examined to determine the movement history of the embankment. Existing piezometer measurements should be examined to determine if the pore-water pressures in the embankment and foundation would under given conditions impair the safety of the dam.
d. Uplift Instrumentation. The existing records of uplift measurements should be examined to determine if the uplift pressures for the maximum pool would impair the safety of the dam.
e. Drainage System Instrumentation. The existing records of measurements of the drainage system flow should be examined to establish the normal relationship between pool elevations and discharge quantities and any changes that have occurred in this relationship during the history of the project.
f. Seismic Instrumentation. The existing records of seismic instrumentation should be examined to determine the seismic activity in the area and the response of the structures of past earthquakes.
6. Reservoir. The following features of the reservoir should be examined to determine to what extent the water impounded by the dam would constitute a danger to the safety of the dam or a hazard to human life or property.
a. Shore line. The land forms around the reservoir should be examined for indications of major active or inactive landslide areas and to determine susceptibility of bedrock stratigraphy to massive landslides of sufficient magnitude to significantly reduce reservoir capacity or create waves that might overtop the dam.
b. Sedimentation. The reservoir and drainage area should be examined for excessive sedimentation or recent developments in the drainage basin which could cause a sudden increase in sediment load thereby reducing the reservoir capacity with attendant increase in maximum outflow and maximum pool elevation.
c. Potential Upstream Hazard Areas. The reservoir area should be examined for features subject to potential backwater flooding resulting in loss of human life or property at reservoir levels up to the maximum water storage capacity including any surcharge storage.
d. Watershed Runoff Potential. The drainage basin should be examined for any extensive alterations to the surface of the drainage basin such as changed agriculture practices, timber clearing, railroad or highway construction or real estate developments that might extensively affect the runoff characteristics. Upstream projects that could have impact on the safety of the dam should be identified.
7. Downstream Channel. The channel immediately downstream of the dam should be examined for conditions which might impose any constraints on the operation of the dam or present any hazards to the safety of the dam. Development of the potential flooded area downstream of the dam should be assessed for compatibility with the hazard classification.
8. Operation and Maintenance Features.
a. Reservoir Regulation Plan. The actual practices in regulating the reservoir and discharges under normal and emergency conditions should be examined to determine if they comply with the designed reservoir regulation plan and to assure that they do not constitute a danger to the safety of the dam or to human life or property.
b. Maintenance. The maintenance of the operating facilities and features that pertain to the safety of the dam should be examined to determine the adequacy and quality of the maintenance procedures followed in maintaining the dam and facilities in safe operating condition.
Appendix III to App. D to § 222.6—Pub. L. 92-367
Appendix E to § 222.6—Suggested Outline Inspection Report—National Dam Inspection Program (RCS-DAEN-CWE-17 and OMB No. 49-R0421) Title Sheet
Name of Dam
ID Number from Inventory
State, County and River or Stream where dam is located
Owner
Size and Hazard Classification
Names of Inspectors
Names of Review Board
Approval Signature of District Engineer
Table of Contents General Assessment
Give brief assessment of general condition of dam with respect to safety, including a listing of deficiencies, and recommendations indicating degree of urgency.
1. Introduction
a. Authority
b. Purpose and Scope of Inspection
2. Project Information
a. Site Information
b. Description of Structures—Dam, Outlet, Spillway and other principal features.
c. Purpose of Dam
d. Design, Construction and Operating History
3. Field Inspection
Briefly describe physical condition of the dam and appurtenant structures as they were observed during the field inspection. (If field inspection form is appended, only present summary.) Describe operational procedures, including any warning system, condition of operating equipment, and provision for emergency procedures. Describe any pertinent observations of the reservoir area and downstream channel adjacent to dam.
4. Evaluation
a. Structural and Geotechnical
(1) General
(2) Embankment and/or Foundation Condition
(3) Stability—Briefly discuss pertinent information such as design, construction and operating records. Assess stability under maximum loading on basis of the record data, together with observations of field inspection and results of any additional, brief calculations performed by inspectors. If additional, detailed stability analyses are considered necessary, recommend that the owner engage a qualified engineer or firm to provide the analysis.
b. Hydrologic and Hydraulic
(1) Spillway Adequacy—Briefly describe pertinent record information such as hydrologic and hydraulic design data, flood of record, and previous analyses. Describe any hydraulic and hydrologic analyses made for this inspection. Present conclusion with respect to adequacy of spillway to pass the recommended spillway design flood without overtopping dam. If overtopping would occur, and if available from the type of analysis used, give maximum depth over top of dam and duration of overtopping, assuming the dam does not fail. Also indicate the largest flood, as a percentage of the probable maximum flood which can be passed without overtopping.
(2) Effects of overtopping—If dam is overtopped by the recommended spillway design flood, provide assessment as to whether or not dam would likely fail, and if, in case of failure, the hazard to loss of life downstream of the dam would be substantially increased over that which would exist without failure. If information upon which to base a reasonable assessment is insufficient, so state and describe the needed data, and recommend that the necessary studies be performed by engineers engaged by the owner.
c. Operation and Maintenance
Assess operating equipment and procedures, emergency power for gate operation, and Emergency Action Plan. Assess quality of maintenance as it pertains to dam safety.
5. Conclusions
Provide conclusions on condition of dam and list all deficiencies. If dam is considered unsafe, so state and give reason.
6. Recommendations
List all recommended actions, including additional studies, installation of new surveillance procedures and devices, development of Emergency Action Plans, and remedial work. Recommend that a qualified engineering firm be retained to accomplish any recommended additional investigations and studies and also to design and supervise remedial works.
Appendixes
a. Inspection Checklist (if available)
b. Other Illustrations as follows:
(1) Include a map showing location of the dam. Usually a portion of a USGS quadrangle sheet can be used which will show the topography of the area, location of the dam, extent of the lake and drainage basin, and perhaps indicate the downstream development.
(2) If available, include a plan and section of the dam.
(3) General photographs of the dam and downstream channel should be included.
(4) Color photographs of deficiencies should be included. These should be held to the minimum required to illustrate the deficiencies.
(5) Available engineering data including Hydrologic/Hydraulic calculation and physical test results that might be available.
Appendix F to § 222.6 Instructions for Unsafe Dam Data Sheet (RCS-DAEN-CWE-17 and OMB No. 49-R0421)
The indicated information shall be provided in the format shown on Pg F-3 for each dam assessed to be unsafe during the reporting period. A separate data sheet should be provided for each unsafe dam. The information supplied should conform to the following.
a. Name—Name of dam.
b. Id. No.—Dam inventory identity number.
c. Location—List state county, river or stream and nearest D/S city or town where the dam is located.
d. Height—Maximum hydraulic height of dam.
e. Maximum Impoundment Capacity—List the capacity of the reservior at maximum attainable water surface elevation including any surcharge loading.
f. Type—Type of dam, i.e., earth, rockfill, gravity, combination earth-gravity, etc.
g. Owner—Owner of dam.
h. Date Governor Notified of Unsafe Condition—The date and method of notification, such as, by telegram, letter, report, etc.
i. Condition of Dam Resulting in Unsafe Assessment—Brief description of the deficiencies discovered which resulted in the unsafe assessment.
j. Description of Danger Involved—Downstream (D/S) hazard potential category and a brief description of the danger involved.
k. Recommendations Given to Governor—Brief description of the actions recommended to Governor at time of notification of unsafe condition to eliminate or reduce the danger.
l. Urgency Category—State whether the unsafe condition of the dam is an emergency or non-emergency situation. An emergency situation should be considered to exist if the failure of the dam is judged to be imminent and requires immediate action to eliminate or reduce the danger.
m. Emergency Actions Taken—In case of an emergency situation, list the actions taken. For non-emergency situation, put NA for “not applicable.”
n. Remedial Action Taken—For non-emergency situations list remedial actions taken.
o. Remarks—For other pertinent information.
Format for Unsafe Dam Data Sheet (RCS-DAEN-CWE-17 and OMB No. 49-R0421 National Program of Inspection of Non-Federal Dams—Unsafe Dam Data Sheet
a. Name:
b. Type:
c. Height:
d. Id. No.
e. Location:
State: County:
Nearest D/S City, Town or Village:
River or Stream:
f. Owner:
g. Date Governor Notified of Unsafe Condition:
h. Condition of Dam Resulting in Unsafe Assessment:
i. Description of Danger Involved:
j. Recommendations Given to Governor:
k. Urgency Category:
l. Emergency Actions Taken:
m. Remarks:
Appendix G to § 222.6 National Program for Inspection of Non-Federal Dams—Monthly Progress Report (RCS-DAEN-CWE-19) I. Instructions for Monthly Progress Report. The indicated information shall be provided in the format shown on page G-2.
1. Division Reporting:
2. Date:
3. Information Required for Each State Regarding Total Number of Inspections Performed (AE Inspections included) (Cumulative):
3.1. Number of Inspections Initiated by on-site inspection or the review of engineering data from project records. 1
1 Each of the initiated inspections reported should be planned for completion within a reasonable period of time (30 days.)
3.2. Number of Inspections Competed (The number of inspection reports which have been submitted to the District Engineer for review and approval).
3.3 Number of Dams Reported to the Governor as Unsafe. 2
2 An unsafe dam is defined as a dam with deficiencies of such a nature that if not corrected could result in the failure of the dam with subsequent loss of lives or substantial property damage.
3.4. Number of Approved Inspection Reports Submitted to the Governor.
4. Information Required for Each State Regarding Inspections Performed Under AE Contracts (Cumulative):
4.1. Number of Dams Contracted for Inspection by AE's with State or Corps.
4.2. Number of Inspections Initiated by AE's by on-site inspection or the review of engineering data from project records. 1
1 See footnote on previous page.
4.3. Number of Inspections Completed by AE's (The number of inspection reports which have been submitted to the District Engineer for review and approval).
4.4. Number of Approved Inspection Reports Prepared by AE's Submitted to the Governor.
II. Formation for Monthly Progress Report. National Program for Inspection of Non-Federal Dams—Monthly Progress Report
1. Division Reporting:
2. Date:
3. Information Required for Each State Regarding Total Number of Inspections Performed (Cumulative):
State | Inspection Initiated (3.1) | Inspection Completed (3.2) | Unsafe Dams Reported (3.3) | Approved Reports (3.4)
Total
4. Information Required for Each State Regarding Inspections Performed Under A/E Contracts (Cumulative):
State | Dams Under A/E Contract (4.1) | A/E Inspections Initiated (4.2) | A/E Inspections Completed (4.3) | A/E Reports Approved (4.4)
Totals
Appendix H to § 222.6 Suggested Scope of Work Contract for Architect-Engineer Services for Safety Inspection of Dams Within the State of ____
1. General Description of Scope of Work. The services to be rendered by the Architect-Engineer (AE) under the proposed contract shall include all engineering functions, hereinafter described, as needed to inspect the dams listed in Appendix A of this contract for the purpose of evaluating their risk of failure. A report which (a) describes the assessed condition of the dam, (b) provides conclusions as to which particular conditions could cause failure, (c) makes recommendations on remedial measures believed necessary, and (d) makes recommendations on whether and what type of future investigation should be conducted shall be provided for each inspected dam. The work shall proceed in accordance with Phase I of the Recommended Guidelines for Safety Inspection of Dams established by the Office of the Chief of Engineers (OCE) and the supplemented requirements listed in paragraph 3 below. The OCE guidelines are listed in Appendix B of this contract.
2. Information and Services To Be Furnished by the Government. The Contracting Officer will furnish the following information and services to the AE:
a. All information pertaining to each dam to be inspected as contained in the National Inventory of Dams.
b. Copies of recommended format for preparation of inspection report, engineering data check list and visual inspection check list.
c. All available pertinent information pertaining to the Dam Inspection Program and previous investigations having a bearing on inspections to be performed under this contract.
d. Right-of-entry for access to each dam site.
3. Services To Be Rendered by the Architect-Engineer. The principal services, subject to the optional provisions of the contract, to be rendered by the AE are itemized below:
a. Technical Investigations.
(1) Engineering Data Collection. To the extent feasible, the engineering data listed in Appendix I of the OCE guidelines relating to the design, construction and operation of the dam and appurtenant structures, should be collected from existing records and reviewed to aid in evaluating the general condition of each dam, including an assessment of the hydraulic and hydrologic features and structural stability of the dam. Where the necessary engineering data are unavailable, inadequate or invalid, a listing shall be made of those specific additional data deemed necessary by the engineer in charge of the investigation and included in the inspection report. The engineering data checklist provided by the Contracting Officer shall be used as a guide to compile this data.
(2) Field Inspections. The field inspection of each dam shall include examination of the items listed in Appendix II of the OCE guidelines, electrical and mechanical equipment for operation of the control facilities, reservoir area, downstream channel in the vicinity of the dam and any other significant feature to determine how these features affect the risk of failure of the dam. The inspection shall be conducted in a systematic manner to minimize the possibility of any significant feature being overlooked. The visual inspection checklist provided by the Contracting Officer shall be used as a guide to document the examination of each significant feature.
Particular attention shall be given to detecting evidence of leakage, erosion, seepage, slope instability, undue settlement, displacement, tilting, cracking, deterioration, and improper functioning of drains and relief wells. The degree and quality of maintenance and regulating procedures for operation of the control facilities shall be assessed. The design and existing condition of such control facilities (i.e., spillway, outlet works, etc.) shall be evaluated. An assessment of the degree of siltation that is evident and its effect on the dam's reservoir shall be performed. Photographs and drawings should be used to record conditions in order to minimize written descriptions.
(3) Engineering Analyses.
(a) Evaluation of Hydraulic and Hydrologic (H&H) Features. Evaluation of the hydraulic and hydrological features of each dam shall be based on criteria set forth in the OCE guidelines. If it is determined that the available H&H data are insufficient, the Contracting Officer must be so informed and may exercise an option of requiring the AE to perform an overtopping analysis at additional agreed-upon compensation. The methodology to be used by the AE for this analysis will be based on the OCE guidelines and subject to the approval of the Contracting Officer.
(b) Evaluation of Structural Stability. The evaluation of structural stability of each dam is to be based principally on existing conditions as revealed by the visual inspection, available design and construction information, and records of performance. The objectives are to determine the existence of conditions, identifiable by visual inspection or from records, which may pose a high risk of failure and to formulate recommendations pertaining to the need for any remedial improvements, additional studies, investigations, or analysis. The results of this phase of the inspection must rely substantially upon the experience and judgment of the inspecting engineer. Should it be determined that sufficient data are not available for a reasonable evaluation of the structural stability of a dam and appurtenances, the Contracting Officer should be informed which information is required prior to attempting to evaluate the risk of failure of the dam.
(c) Evaluation of Operational Features. Where critical mechanical/electrical operating equipment is used in controlling the reservoir of a dam, an evaluation of the operational characteristics of this equipment from the standpoint of risk of failure must be performed.
(d) Evaluation of Reservoir Regulation Plan and Warning System. The operational characteristics of each dam's existing reservoir regulation plan and warning system in event of a threatened failure shall be investigated.
b. Emergency Situations. The Contracting Officer must be immediately notified of any observed condition which is deemed to require immediate remedial action. After being notified, the Contracting Officer will contact the appropriate State personnel and will meet the AE at the site to determine the appropriate course of action. This will not relieve the AE of his responsibility to prepare a comprehensive inspection report at the earliest practicable date.
c. Qualifications of Investigators. The technical investigations shall be conducted by licensed professional engineers with a minimum of five years experience after licensing in the investigation, design and contruction of earthfill, rockfill and concrete dams and/or in making risk of failure evaluations of completed dams. These engineers must be knowledgeable in the disciplines of hydrology, hydraulics, geotechnical, electrical, mechanical and structural engineering, as necessary. All field inspections should be conducted by engineers, engineering geologists and other specialists who are knowledgeable in the investigation, design, construction and operation of dams, including experts on mechanical and electrical operation of gates and controls, where needed.
d. Preparation of Report. A formal report shall be prepared for each dam inspected for submission to the Contracting Officer. Each report should contain the information specified in OCE guidelines and any other pertinent information. The recommended format provided by the Contracting Officer shall be used to document each report. The signature and registration identification of the professional engineer who directed the investigation and who was responsible for evaluation of the dam should be included in the report.
4. Supervision and Approval of Work. All work performed under this contract shall be subject to the review and approval of the Contracting Officer or his designee. Meetings will be held on a regular basis in the District office, during which the progress of inspections will be discussed and questions relating to inspection reports previously received by the Contracting Officer will be addressed. Reports will be revised as necessary when required by the Contracting Officer.
5. Coordination. During the progress of work, the AE shall maintain liaison with the * ____ and other local authorities through the Contracting Officer as required to assure the orderly progression of the inspection. Copies of all correspondence with such authorities shall be provided to the Contracting Officer.
* Note: Write in the designated State Authority.
6. Submission of Report.
a. Each inspection report will be submitted for review to the Contracting Officer. Reports will be revised as required by the Contracting Officer. After all revisions have been made, the original and __ copies of each inspection report shall be submitted to the Contracting Officer.
b. Text of all reports shall be typewritten and printed on both sides of 8″ × 10 1/2″ paper. All notes, inspection forms, sketches or similar matter shall be legible, distinct and suitable for reproduction.
7. Period of Services.
a. All inspections and reports included under this contract shall be completed within __ days from date of Notice to Proceed.
b. If the option for performing an H&H analysis for any particular site is exercised, the AE shall complete such analysis within __ days from date of Notice to Proceed. However, the overall completion time stated in paragraph 7a above shall not change.
Appendix I to § 222.6 Procedure for Using NASA Land Satellite Multispectral Scanner Data for Verification and Updating the National Inventory of Dams
1. Purpose. This appendix states the objective, defines the scope, prescribes procedures, and assigns responsibilities for using NASA Land Satellite (LANDSAT) Multispectral Scanner data along with NASA's Surface Water Detection And Mapping (DAM) Computer program to assist in verification and updating the National Inventory of Dams.
2. Applicability. This appendix is applicable to all divisions and districts having Civil Works responsibilities except POD.
3. Reference. NASA, DETECTION AND MAPPING PACKAGE, Users Manuals, Volumes 1, 2a, 2b, and 3 dated June 1976, published by the Johnson Space Center, Houston, Texas.
4. Objectives. Provide a uniform method, nation-wide, to help insure that all dams subject to Public Law 92-367, 8 August 1972 are properly identified and located in the National Inventory of Dams.
5. Scope. The computer printer overlay maps produced by the procedure described in reference 3b will be used by district and/or state or contractor personnel as a tool to assist in verification and updating of the National Inventory of Dams.
6. Exceptions. a. If a Division/District attempts the use of the procedure for a given region within their area of responsibility and finds the overlay maps cannot be used to assist in verification and updating the National Inventory of Dams, they may request an exception for a selected region. A selected region may include areas where conditions can reasonably be assumed to be the same as the region where the procedure was tried.
b. Request for exceptions should be documented to include firm boundary definitions and appropriate justification to demonstrate why the procedure cannot be used. This request should be submitted to WRSC WASH DC 20314, through the normal engineering chain of command.
c. Map overlays will be produced for all areas of the Continental United States even if they are not used in a few selected regions. This processing is required for a future Computer Water Body Change Detection system.
7. Procedures. Acquisition of LANDSAT data, registration of satellite coordinates to earth latitude and longitude and computer processing to produce overlay maps will be accomplished by two Regional Centers. Nashville District and Seattle District have been designated as the Regional Centers, with each responsible for processing maps by state based on Divisional assignments in Appendix A. Regional Centers will support divisions as follows:
Regional Center | Division
Nashville District | New England North Atlantic South Atlantic Ohio River Lower Mississippi Valley North Central
Seattle District | Southwestern Missouri River North Pacific South Pacific
8. Responsibilities. a. The Water Resources Support Center at Fort Belvoir has overall responsibility for coordination and monitoring of this activity between NASA, Division Offices, and Regional Centers, and for providing Regional Center funding.
b. Regional Centers are responsible for:
(1) Acquiring proper LANDSAT data tape from EROS Data Center (Sioux Falls, South Dakota). Actual data scene selection will be coordinated with Division and/or District to insure proper consideration is given to local priorities and seasonal coverage.
(2) Arranging computer processing support using NASA's DAM package.
(3) Establishing proper control between satellite scanner-oriented coordinates and earth latitude/longitude.
(4) Producing total coverage of map overlays at a scale of 1:24,000 and/or smaller scales as required by Divisions and/or Districts.
(5) Instructing District, State, or contractor personnel in the assembly and use of map overlays.
c. Divisions/Districts are responsible for:
(1) Designating one person from each Division and District as the point of contact with the Regional Center and provide this person's name and phone number to the Regional Center.
(2) Providing the Regional Center with map coverage of their area of responsibility. This will include state indexes and 7 1/2 minute quadrangle sheets (scale 1:24,000) where available.
(3) Coordinating with the Regional Center in selecting LANDSAT data tapes.
(4) Providing information to Regional Center on scale and priorities of desired computer produced map overlays.
(5) Assembling computer print-outs into overlay maps, and using as appropriate to assist in verification and updating the National Inventory of Dams.
9. Points of Contact. The points of contact in the Regional Centers for this program are as follows:
Name, Office Symbol, and Telephone Jim Cook—DAEN-ORNED, (615) 251-7366; FTS 852-7366. Jack Erlandson—DAEN-NPSEN, (206) 764-3535; FTS 399-3535.
[44 FR 55336, Sept. 26, 1979, as amended at 45 FR 18925, Mar. 24, 1980. Redesignated at 60 FR 19851, Apr. 21, 1995]
PART 230 PROCEDURES FOR IMPLEMENTING NEPA
Authority: National Environmental Policy Act (NEPA) (42 U.S.C. 4321 et seq.); 5 U.S.C. 301
Source: 53 FR 3127, Feb. 3, 1988, unless otherwise noted.
§ 230.1 [Reserved]
§ 230.2 Applicability.
This regulation is applicable to the U.S. Army Corps of Engineers Civil Works program, except the permitting programs and the 33 U.S.C. 408 request for permission program covered in 33 CFR part 333.
[90 FR 29464, July 3, 2025]
§§ 230.3-230.8 [Reserved]
§ 230.9 Categorical exclusions.
Actions listed below when considered individually and cumulatively do not have significant effects on the quality of the human environment and are categorically excluded from NEPA documentation. However, district commanders should be alert for extraordinary circumstances which may dictate the need to prepare an EA or an EIS. Even though an EA or EIS is not indicated for a Federal action because of a “categorical exclusion”, that fact does not exempt the action from compliance with any other Federal law. For example, compliance with the Endangered Species Act, the Fish and Wildlife Coordination Act, the National Historic Preservation Act, the Clean Water Act, etc., is always mandatory, even for actions not requiring an EA or EIS.
(a) For a period of one year from the effective date of these regulations, district commanders should maintain an information list on the type and number of categorical exclusion actions which due to extraordinary circumstances triggered the need for an EA and finding of no significant impact (FONSI) or an EIS. If a district commander determines that a categorical exclusion should be modified, the information will be furnished to the division commander, who will review and analyze the actions and circumstances to determine if there is a basis for recommending a modification to the list of categorical exclusions. HQUSACE (CECW-RE) will review recommended changes for Corps-wide consistency and revise the list accordingly. See 33 CFR part 325, appendix B for categorical exclusions for regulatory actions.
(b) Activities at completed Corps projects which carry out the authorized project purposes. Examples include routine operation and maintenance actions, general administration, equipment purchases, custodial actions, erosion control, painting, repair, rehabilitation, replacement of existing structures and facilities such as buildings, roads, levees, groins and utilities, and installation of new buildings utilities, or roadways in developed areas.
(c) Minor maintenance dredging using existing disposal sites.
(d) Planning and technical studies which do not contain recommendations for authorization or funding for construction, but may recommend further study. This does not exclude consideration of environmental matters in the studies.
(e) All Operations and Maintenance grants, general plans, agreements, etc., necessary to carry out land use, development and other measures proposed in project authorization documents, project design memoranda, master plans, or reflected in the project NEPA documents.
(f) Real estate grants for use of excess or surplus real property.
(g) Real estate grants for Government-owned housing.
(h) Exchanges of excess real property and interests therein for property required for project purposes.
(i) Real estate grants for rights-of-way which involve only minor disturbances to earth, air, or water:
(1) Minor access roads, streets and boat ramps.
(2) Minor utility distribution and collection lines, including irrigation.
(3) Removal of sand, gravel, rock, and other material from existing borrow areas.
(4) Oil and gas seismic and gravity meter survey for exploration purposes.
(j) Real estate grants of consent to use Government-owned easement areas.
(k) Real estate grants for archeological and historical investigations compatible with the Corps Historic Preservation Act responsibilities.
(l) Renewal and minor amendments of existing real estate grants evidencing authority to use Government-owned real property.
(m) Reporting excess real property to the General Services Administration for disposal.
(n) Boundary line agreements and disposal of lands or release of deed restrictions to cure encroachments.
(o) Disposal of excess easement interest to the underlying fee owner.
(p) Disposal of existing buildings and improvements for off-site removal.
(q) Sale of existing cottage site areas.
(r) Return of public domain lands to the Department of the Interior.
(s) Transfer and grants of lands to other Federal agencies.
PART 234 CORPS OF ENGINEERS AGENCY SPECIFIC PROCEDURES TO IMPLEMENT THE PRINCIPLES, REQUIREMENTS AND GUIDELINES FOR FEDERAL INVESTMENTS IN WATER RESOURCES
Authority: 42 U.S.C. 1962-3.
Source: 89 FR 104021, Dec. 19, 2024, unless otherwise noted.
§ 234.1 General.
(a) This part prescribes the Agency Specific Procedures (ASPs) for the United States Army Corps of Engineers (Corps) to execute its Civil Works mission, in accordance with the Water Resources Principles and Guidelines defined in section 2031 of the Water Resources and Development Act (WRDA) of 2007 (Pub. L. 110-114; 42 U.S.C. 1962-3), the Principles, Requirements and Guidelines (PR&G) issued by the Council on Environmental Quality and approved by the Water Resources Council, and as called for in section 110 of WRDA 2020 (Division AA of Pub. L. 116-260).
(b) Section 2031 of the WRDA of 2007 (Pub. L. 110-114) directed the Secretary of the Army to revise the March 10, 1983, Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies (P&G) for Corps use and to address the following considerations: advancements in economic and analytic techniques; public safety; low-income communities; nonstructural approaches; interaction with other water resources projects and programs; integrated and adaptive management; and use of public benefits to justify projects. This WRDA provision also provided that the Federal Objective is to reflect national priorities, encourage economic development, and protect the environment by seeking to maximize sustainable economic development, avoid the unwise use of floodplains, and protect and restore natural ecosystems.
(c) The PR&G was issued as an interagency effort to modernize the P&G. The PR&G is comprised of the Principles and Requirements (P&R) issued in March 2013 and the Interagency Guidelines issued in December 2014. The PR&G emphasizes that water resources projects should strive to meet the Federal Objective and maximize public benefits relative to public costs. The PR&G is designed to support water infrastructure projects with the greatest public benefits (economic, environmental, and social benefits) relative to costs.
(d) Congress directed the Secretary of the Army to issue ASPs to implement the PR&G in section 110 of WRDA 2020 (Division AA of Pub. L. 116-260).
§ 234.2 Definitions.
Acceptability. The viability and appropriateness of an alternative from the perspective of the Nation's general public and consistency with existing Federal laws, authorities, and public policies. It does not include local or regional preferences for solutions or political expediency.
Adaptive management. A deliberate, iterative, and scientific-based process of designing, implementing, monitoring, and adjusting an action, measure, or project to address changing circumstances and outcomes, reduce uncertainty, and maximize one or more goals over time.
Completeness. The extent to which an alternative provides and accounts for all features, investments, and/or other actions necessary to realize the planned effects, including any necessary actions by others. It does not necessarily mean that alternative actions need to be large in scope or scale.
Effectiveness. The extent to which an alternative alleviates the specified problems and achieves the specified opportunities.
Efficiency. The extent to which an alternative alleviates the specified problems and realizes the specified opportunities at the least cost.
Federal investment. Investments made by the Corps related to water resources development projects, including flood and storm risk management, ecosystem restoration, land management activities, navigation, recreation, and hydropower.
Federal Objective. The fundamental goal of Federal investments in water resources. Federal water resources investments shall reflect national priorities, encourage economic development, and protect the environment. Federal investments should strive to maximize net public benefits.
Indigenous Knowledge. Indigenous Knowledge may be described as a body of observations, oral and written knowledge, innovations, practices, and beliefs developed by Tribes and Indigenous Peoples through interaction and experience with the environment, consistent with the definitions used in 43 CFR 2361.5 and 6101.4(h) and the Guidance for Federal Departments and Agencies on Indigenous Knowledge, issued November 30, 2022. It is applied to phenomena across biological, physical, social, cultural, and spiritual systems. Indigenous Knowledge can be developed over millennia, continues to develop, and includes understanding based on evidence acquired through direct contact with the environment and long-term experiences, as well as extensive observations, lessons, and skills passed from generation to generation.
Nature-based alternatives. An alternative comprised of actions to protect, sustainably manage, or restore natural or modified ecosystems to address societal challenges, while simultaneously providing benefits for people and the environment.
Non-Federal interest. (1) A legally constituted public body (including an Indian Tribe and a Tribal Organization (as those terms are defined in 25 U.S.C. 5304)); or
(2) A nonprofit entity with the consent of the affected local government, that has full authority and capability to perform the terms of its agreement and to pay damages, if necessary, in the event of failure to perform.
Nonstructural alternative. An alternative comprised of a nonstructural approach or combination of nonstructural approaches that addresses the water resources problem.
Nonstructural approach. An approach that alters the use of existing infrastructure or human activities to generally avoid or minimize adverse changes to existing hydrologic, geomorphic, and ecological processes. This may include measures such as certain forms of nature-based solutions; modified floodplain practices; policy modifications; vessel speed limits; traffic management and tidal navigation restrictions; the reoperation of dams and reservoirs to restore or better mimic natural hydrology and flow patterns; invasive plant removal; signage to limit public access at an aquatic ecosystem restoration site; setbacks; elevations; relocation; buyout/acquisition including the acquisition of flowage easements; dry flood proofing; and wet flood proofing. They may also include actions that are not the responsibility of the Corps such as providing flood insurance, establishing building codes for new construction, and other local floodplain management practices, installing early warning systems, and developing emergency evacuation plans.
Professional judgment. An evidence-based decision that relies on appropriate training and experience.
Public benefits. Encompasses economic, environmental, and social impacts, and includes those that can be quantified in monetary terms, as well as those that can be quantified or described qualitatively.
Regional economic development effects. The changes in the distribution of regional economic activity that would result from implementation of an alternative plan. These economic effects amount to a transfer of resources from one part of the Nation to another (either from one region of the country to another, or within a region). They accrue in a local area or region but are offset by equivalent losses elsewhere in the country.
Regulatory. Generally, those activities subject to legal restrictions promulgated by the Federal Government.
Resilience. Resilience is the ability to prepare for threats and hazards, adapt to changing conditions, and withstand and recover rapidly from adverse conditions and disruptions.
Sustainable. The creation and maintenance of conditions under which humans and nature can coexist in the present and into the future.
Tribal Nation (Federally recognized Indian Tribe or Tribal Organization). An Indian or Alaska Native tribe, band, nation, pueblo, village, or community that the Secretary of the Interior acknowledges to exist as an Indian Tribe pursuant to the Federally Recognized Indian Tribe List Act of 1994, 25 U.S.C. 5130.
Unwise use of floodplains. Any action or change that diminishes public health and safety, or an action that is incompatible with or adversely impacts one or more floodplain functions that leads to a floodplain that is no longer self-sustaining or degrades ecosystem services.
Watershed. A land area that drains to a common waterbody.
§ 234.3 Exceptions.
Exceptions to any requirements or policy contained in this part may be requested by the Corps or the non-Federal interest or responsible Tribal, State, or local government. Exceptions must be requested in writing and will be reviewed for a decision by the Assistant Secretary of the Army for Civil Works.
§ 234.4 Objectives and applicability.
(a) Introduction. The goal of the Department of the Army's ASPs is to ensure that Army Civil Works consistently applies a common framework for analyzing a diverse range of water resources development projects, programs, activities, and related actions involving Federal investments. The ASPs will advance transparency and consistency of the Corps' Federal investments in water resources. The intention of the ASPs is to outline the steps to apply the PR&G to Corps water resources investments, including a determination of the applicability of the PR&G in the context of the Corps' missions and authorities, to provide a common framework for evaluation of investment alternatives, and to ensure that the Corps adequately addresses the Guiding Principles identified in the P&R.
(b) Objectives for Federal water resources investments. Section 2031 of WRDA 2007 (Pub. L. 110-114; 42 U.S.C. 1962-3) specifies that Federal water resources investments shall reflect national priorities, encourage economic development, and protect the environment. The Corps shall accomplish this Federal Objective of water resources planning policy by:
(1) Seeking to maximize sustainable economic development;
(2) Seeking to avoid the unwise use of floodplains and flood-prone areas and minimizing adverse impacts and vulnerabilities in any case in which a floodplain or flood-prone area must be used; and
(3) Protecting and restoring the functions of natural systems and mitigating any unavoidable damage to natural systems.
(c) Net public benefits. The Corps shall strive to maximize net public benefits to society. Public benefits encompass economic, environmental, and social goals, include monetized and un-monetized effects, and allow for the consideration of both quantified and unquantified effects.
(d) Applicability. (1) The objectives in paragraph (b) of this section shall be embodied in all new Army Civil Works' water resources investments, which include both structural and nonstructural approaches to water resources problems. The PR&G analysis under the Corps' ASPs described in this part is generally required for feasibility studies; general re-evaluation reports; major rehabilitation reports; studies performed under the continuing authorities program of the Corps; studies to support significant changes to project operations including any such changes that warrant preparation of an environmental impact statement, re-allocation studies, and studies conducted under section 216 of the Flood Control Act of 1970 (33 U.S.C. 549a); and any other project or program not otherwise excluded under paragraph (d)(2) of this section.
(2) The PR&G is not intended to apply to all Federal actions. The following types of Federal investments are identified as excluded from the requirements of this part:
(i) Regulatory actions, such as the issuance of permits associated with section 404 of the Clean Water Act (33 U.S.C. 1344).
(ii) Real estate actions.
(iii) Planning Assistance to States program.
(iv) Flood Plain Management Services program.
(v) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408) program.
(vi) Public Law 84-99 program.
(vii) Water Infrastructure Finance and Innovation Act Program.
(viii) Environmental Infrastructure projects.
(ix) Land management plans.
(x) Operation and maintenance activities that are carried out in a manner consistent with the existing approved operation and maintenance manual or plan for an authorized project. This exclusion does not apply to significant proposed changes to an existing O&M plan including proposals that may be controversial, significant changes to the existing plan to meet new goals, and other significant changes that may warrant a further analysis of the options for operation and maintenance.
(xi) International and Interagency Services and Support for Others actions.
(xii) Research or monitoring activities.
(xiii) Emergency actions.
(xiv) Projects, programs, or plans that fall below the thresholds identified in table 1 to § 234.5(c). These excluded actions generally occur when investments are routine and have inconsequential effects on water resources.
(xv) Additional programs, plans, or projects which the Assistant Secretary of the Army for Civil Works determines do not require analysis pursuant to § 234.3.
§ 234.5 Level of analysis.
(a) Standard and scaled levels of analysis. Once a determination has been made that the PR&G does apply, the level of analysis shall be determined. The level of PR&G analysis required will vary in scope and magnitude across programs and activities. There are two levels of analysis: standard and scaled. In general, the level of analysis should be commensurate with the significance of the Federal investment in terms of dollar value and the potential environmental impacts. While there is not a clear distinction between the different levels of analysis, the two types of analysis can generally be distinguished in several ways:
(1) A standard analysis seeks to evaluate all the relevant benefits and costs associated with the project or activity using original or secondary data. This type of analysis is typically used for new or significantly modified actions. The Corps would conduct a benefit-cost analysis of programs and activities that have some effect on the environment. For projects/activities that fall into the category of standard analysis, the analysis should make significantly greater efforts to quantify and monetize impacts. The extent to which effects can and should be monetized should be made on a resource-by-resource basis and should consider the estimated present value cost of the project/activity and the significance of the effects.
(2) A scaled analysis is an analysis that is more limited in scope for projects, programs, or plans that have low risk/low cost, have minimal consequences of failure, pose minimal threats to human life or safety, or do not result in significant impacts to the environment. A scaled analysis may rely on benefits function transfer methods and readily available secondary data sources. Benefits function transfer methods are used to estimate monetary values by transferring available information about relationships from studies already completed to another location, context, or issue. Best practices would be applied when using this approach to avoid common pitfalls.
(b) Determining the appropriate level of analysis. In many cases, professional judgment and available resources will be important factors in determining the appropriate level of analysis. The Corps will ensure that cumulative effects of many small, routine actions would not in itself elevate those investments to a scaled or standard analysis. Many of those small, routine actions would be excluded from PR&G analysis.
(c) Scope and magnitude of analysis required. The threshold criteria for project, programmatic, and individual plan level analysis for Army Civil Works is shown in table 1 to this paragraph (c). These thresholds represent guidelines for the level of analysis that is likely to be most appropriate for an activity, given the level of investment in, appropriations for, or cost of that activity. In determining whether a given activity or project falls under or exceeds the financial thresholds, it is the level of the present value of Federal investment that is the relevant criterion to use. However, for a particular activity, a different level of analysis may be more appropriate, and projects/programs may depart from these guidelines where such a departure is justified. In general, a scoping effort should be undertaken to evaluate the level of effort needed to analyze the full range of potential effects. Project-level analysis should generally be used for water resources investments when the Corps has discretion in site-specific investment decisions. A programmatic-level analysis generally has a broader scale and/or scope than a project-level analysis. Programmatic-level analysis generally relates to funding programs or where a proposal for a set of similar actions analyzed under one decision document may occur.
Table 1 to Paragraph (c)—Monetary Threshold Criteria
Type of activity | Total investment ($M) | Annual federal appropriations ($M) | Level of analysis
Projects Proposed Corps investments in water resources, such as infrastructure, ecosystem restoration, new construction, modifications or replacements to existing facilities, and operations and maintenance | >30 15-30 <15 | Standard analysis. Scaled analysis. Excluded.
Programs | >100 50-100 <50 | Standard analysis. Scaled analysis. Excluded.
Individual Plans Management plans, such as watershed, master, etc. | >50 10-50 <10 | Standard analysis. Scaled analysis. Excluded.
§ 234.6 The planning process.
(a) Introduction. The following planning process will be used to implement the common framework summarized in the Interagency Guidelines for analyzing Federal investments in applicable water resources. The planning process will ensure that plan formulation, evaluation, and recommendations for proposed Corps investments reflect the Guiding Principles identified in the P&R: healthy and resilient ecosystems, sustainable economic development, floodplains, public safety, environmental justice, and a watershed approach. The planning process consists of a series of steps that identify or respond to problems and opportunities, as well as specific Tribal, State, and local concerns, and, in most cases, culminates in a recommended plan. The process involves an orderly and systematic approach to making determinations and decisions at each step so that the interested public and decision-makers in the planning organization can be fully aware of the following: the basic assumptions employed; the data and information analyzed; the areas of risk and uncertainty; the reasons and rationales used; and the significant implications of each alternative. The Corps will identify impacts to Tribal treaty and water rights at the earliest phases and throughout the plan evaluation process, screening alternatives that impact Tribal treaty and water rights. The planning process is iterative to adapt to new information and understanding. The result of the planning process is investment advice. The advice may be a recommended plan or plans that seek to maximize net public benefits in addressing the identified water resources problem and a description of the analysis of the benefits and costs of that and other potential plans.
(b) National Environmental Policy Act (NEPA). Where Federal investments in water resources require analysis under NEPA and this part, Army Civil Works should integrate, to the extent possible, the analysis in this part into existing planning processes, and may integrate this part and NEPA analyses in a single analytical document that reflects both processes. Army Civil Works shall seek opportunities to integrate other required Federal and State environmental reviews with their combined analyses.
(c) Guiding Principles. The Guiding Principles provide the overarching concepts that the Corps seeks to promote through investments in water resources.
(1) Environmental justice. Environmental justice refers to the just treatment and meaningful involvement of all people regardless of income, race, color, national origin, Tribal affiliation, or disability, in agency decision-making and other Federal activities that affect human health and the environment so that people:
(i) Are fully protected from disproportionate and adverse human health and environmental effects (including risks) and hazards, including those related to climate change, the cumulative impacts of environmental and other burdens, and the legacy of racism or other structural or systemic barriers; and
(ii) Have equitable access to a healthy, sustainable, and resilient environment in which to live, play, work, learn, grow, worship, and engage in cultural and subsistence practices. Environmental justice shall be considered throughout the Civil Works program and in all phases of project planning and decision-making. Army Civil Works projects and programs shall advance equity by meeting the needs of communities, such as by reducing disparate environmental burdens, protecting Tribal treaty rights, removing barriers to participation in decision-making, and increasing access to benefits provided by Civil Works programs, including for disadvantaged communities. The planning process shall put these communities at the front and center of studies, providing robust opportunities for effective participation in the planning and decision-making processes. Any disproportionate adverse public safety, human health, or environmental burdens of project alternatives on communities with environmental justice concerns shall be avoided, minimized, or mitigated to the greatest extent reasonable. The Corps shall ensure that communities with environmental justice concerns have meaningful opportunities to identify potential alternatives, effects, and mitigation measures. The Corps shall also be transparent in fully displaying, disclosing and considering the potential effects of alternative actions on communities with environmental justice concerns.
(2) Floodplains. All future Federal investments in and affecting floodplains must meet some level of floodplain resilience. Alternatives affecting floodplains should aim to improve floodplain resilience if possible and also should avoid the unwise use of floodplains. To identify floodplain areas for the purpose of this section, the Corps will use the best-available and actionable science including a climate-informed science approach. If construction in the floodplain or adverse impacts to a floodplain's natural and beneficial functions cannot be avoided, then the alternative must minimize adverse impacts to these areas and mitigate unavoidable impacts using nature-based approaches where possible. The Corps shall identify and communicate potential adverse effects on floodplain functions for the various alternatives under consideration. Where the Corps proposes to construct a project feature in a floodplain because that is the best way to achieve flood risk reduction or other public purposes, that proposed Corps project is not automatically considered an unwise use of the floodplain. The Corps shall strive to sustain the floodplain's natural and beneficial functions to the maximum extent practicable given the project's purpose and need.
(3) Healthy and resilient ecosystems. Alternatives shall protect the existing functions of ecosystems and may restore the health of damaged ecosystems to a less degraded and more natural state where feasible and in accordance with current study and cost-sharing authorities. When adverse environmental impacts cannot be completely avoided, alternatives shall strive to minimize environmental impacts. When a particular alternative will cause unavoidable damage to the environment, mitigation to offset damages shall be incorporated into that alternative and evaluated as part of that alternative. In developing alternatives, consideration shall be given to ecosystem resilience, including acknowledging the value of ecosystem services to people. When evaluating alternatives, the health of the affected ecosystem shall be measured in its current condition as the baseline and projected under the alternatives being considered, including the No Action alternative.
(4) Public safety. Alternative solutions shall strive to avoid, reduce, or mitigate significant risks to public safety, including both loss of life and injury, and shall include measures to manage and communicate the residual risks. The impact and reliability of alternatives on significant risks to public safety must be evaluated for both existing and future conditions, considered in decision-making, and documented.
(5) Sustainable economic development. The Corps' investments in water resources shall encourage sustainable economic development. This is accomplished through the sustainable use and management of water resources, ensuring overall water resources resilience. Sustainable economic development creates and maintains conditions under which humans and nature can coexist. Analysis under sustainable economic development shall present, where feasible, information about the environmental resources in the project area or the area where activities are occurring, and how the resources and their value might be expected to change over time. Physical capital information may also be included where relevant. Analysis shall also include information on socio-economic conditions under current and projected conditions. Economic, social, and environmental effects and benefits shall be incorporated into the analysis of alternatives.
(6) Watershed approach. When developing alternatives, the water resources problem being addressed should be analyzed on a watershed-based level to facilitate inclusion of a complete range of solutions, after considering the breadth of impacts across the watershed. A key aspect of the watershed approach is the analysis of information regarding watershed conditions and needs, allowing for consideration of upstream and downstream conditions and needs; consideration of other projects and actions in place, underway or planned by other agencies within the watershed; and the more thorough addressing of the potential impacts of a proposed action. The scale of the watershed used to develop alternatives can vary. The appropriately sized watershed for the particular need being addressed shall be a case-specific determination based on the relevant facts and circumstances. The watershed scale used to develop alternatives should encompass a geographical area large enough to ensure plans address cause and effect relationships among affected resources and activities, both upstream and downstream, and cumulative in nature, that are important to gaining public benefits or avoiding harm from the project. The watershed approach ensures that the interconnectedness of systems is evaluated to fully understand the root causes and symptoms of the water resources problem and the full range of potential public benefits. Communication starting in the scoping phase with other agencies or Tribal, territorial, State, and local government partners working in the watershed will help realize a watershed approach. In addition, other potential investments in the watershed shall also be accounted for under the watershed approach.
(d) Collaboration. (1) The planning process will seek to achieve full collaboration with a wide range of affected Tribes, governmental and non-governmental stakeholders, communities with environmental justice concerns, and the public in all stages of the planning process. Collaboration with Tribes, governmental and non-governmental stakeholders, communities with environmental justice concerns, and the general public throughout the planning process allows consideration of multiple perspectives and information sources, such as Indigenous Knowledge, and shall be emphasized throughout the planning process. Collaboration with Tribes, communities, and local and State governments is a critical element to help identify specific problems, opportunities, and significant constraints within the study area, and to help establish planning goals and objectives that are consistent with the objectives of this part and are locally appropriate. Starting at the earliest phase in the planning process, Tribes and other communities with environmental justice concerns shall have an opportunity to play a key role in identifying alternatives, enhancing the positive benefits to their communities from potential Federal investment, and describing any concerns they may have with a potential project. Such early, meaningful, and robust engagement will help identify and address problems, possible solutions, and scope studies. Robust, early collaboration with Tribes does not negate the need for Tribal consultation. Robust, early collaboration with Tribes is in addition to the requirement to conduct early, meaningful, and robust Government-to-Government consultation with Tribal Nations when appropriate.
(2) To improve Federal decision-making and to promote transparency, Army Civil Works shall seek to meaningfully collaborate with other Federal and non-Federal entities. Engagement methods and scope of engagement will depend on the stage of the planning process, the issues, and the groups that will be contributing ideas and information to the planning process, and shall use best practices and techniques for engagement. Engagement strategies shall consider Corps, Tribal, and community resource constraints. Indigenous Knowledge, information from Tribal Nations, local and State governments, non-governmental organizations, and the public shall be incorporated into the problem definition and forecasting of future conditions as well as the development and analysis of alternatives. Robust engagement and transparency throughout the planning process, including during the evaluation and comparison of alternatives, will help deliver sound investment advice for water resources solutions that maximize net public benefits.
(e) Investigations and data collection. Investigations, data collection, and analysis should be ongoing and integrated early in the planning process. Investigations should be relevant to the planning objectives and constraints. The interdisciplinary study team should identify the most important areas to focus on in the study, such as: engineering and design; surface water and groundwater hydrology; hydraulics; geology; operations; water quality; land resources; power generation and conservation; economics; financing; environmental, social, and cultural impacts and mitigation; opportunities for recreation; cost estimation for construction, operation, maintenance, replacement, and energy consumption; and climate change (to include greenhouse gas emissions). Investigation, data collection, and analysis should leverage and incorporate information from Tribal, State, local, non-governmental sources, and the public. Additional investigations should be performed as necessary.
(f) Identify purpose, problems, needs, and opportunities. To identify purpose, problems, needs, and opportunities, the Corps shall:
(1) Ensure that the planning goals and objectives are consistent with the study authority.
(2) Clearly identify the purpose of the study, the role of the Federal Government, as well as the views of the non-Federal interest (if any), cooperating agencies, Tribes, various stakeholders, and the public.
(3) Describe the problems and opportunities to which the agency is responding in a manner that will not foreclose consideration of the full range of reasonable alternatives, including options that the non-Federal sponsor may not support.
(4) Define the study area, including activities within the watershed that are relevant to the proposed project and areas where impacts should be avoided.
(5) Describe the plans for stakeholder involvement.
(6) Prepare a summary of the planning objectives and constraints to be used in the analysis of the Federal investment. This summary should include a discussion of stakeholder, partner, and public input.
(7) Include a discussion of the social and cultural context of the region and resources.
(g) Inventory existing resources and forecast future conditions. A summary of the specific economic, environmental, and social setting within the study area shall cover the condition and functional relationships of affected resources; their development potential and possible conflicts in producing affected ecosystem services; and the local situation with respect to investment, climate, markets, affected communities, and basic economic productivity.
(1) The phrase “forecast future conditions” generally relates to the identification of impacts associated with the alternatives, including the No Action alternative. Future conditions should be assessed and analyzed as part of the evaluation process, and the best available data and forecast should be used to complete an analysis of these uncertain conditions.
(2) This exercise of identifying existing resources and forecasting future conditions will quantify, to the extent practicable, relevant water and related resource conditions as they currently exist within the study area, and forecast future conditions over the period of analysis. This would also include resources and conditions regarding the economic, environmental, and social aspects within the study area, as well as ecosystem services and climate-related scenarios. The existing resources and future conditions will be established using generally accepted sources that are national, State, or regional in scope, such as from peer-reviewed sources or sources which are government-produced.
(3) The “without-project condition” is the most likely condition expected to exist in the future over the period of analysis in the absence of a Federal investment by the Corps (through the proposed Corps project, action, or program that is under consideration), given current laws, policies, projects under construction, and any existing resources/conditions. It considers expected actions that may be executed by others, including potential future land use conditions, and shall consider effects of climate change using multiple scenario analyses.
(4) The “with-project condition” is the most likely condition expected to exist in the future, over the period of analysis, with a specific Corps project or program in place. It considers expected actions that may be executed by others, including potential future land use conditions, and shall consider effects of climate change using multiple scenario analyses.
(5) To ensure that the appropriate criteria and problems are incorporated into the analytical framework, a summary of the process used to define the relevant existing conditions and foreseeable future conditions shall be prepared and made available to the public and shared with stakeholders.
(h) Formulate alternatives. The primary goal of an alternative is to address a water resources challenge, consistent with the Federal Objective and Guiding Principles. The primary function of an alternative must be to alleviate unsatisfactory conditions or address a problem or opportunity that exists or will exist in the future without the proposed Federal investment that is under consideration. Alternatives should address the defined water resources challenge that is the subject of the analysis, and may achieve multiple purposes. Alternative formulations should focus on solutions that are feasible and meet the planning objectives of the study, based on the most likely future conditions expected with and without implementation of an alternative. The viability of an alternative should be determined through an evaluation of its acceptability, efficiency, effectiveness, and completeness, as required in the PR&G. The period of analysis should be the same for each alternative and sufficient to encompass the lifespan and significant long-term impacts of the project. In addition, alternatives may also include actions which are beyond the missions of the Corps where others may help provide solutions to the identified problem and meet the goals of the PR&G. However, such alternatives shall identify the relevant parties with requisite responsibility for those actions beyond Corps missions (such as other Federal agencies and non-Federal partners), their authority for that action, the interrelation between that action and the recommended Corps project, action, or program and appropriate sequencing of implementation. For Corps investments, the Corps will be the designated lead for completing PR&G analysis.
(1) Alternatives are to be developed in a systematic manner that ensures that the Corps has identified and considered the full range of reasonable alternatives. A range of potential alternatives should be initially investigated reflecting a range of scales and measures, and as alternatives are refined, some would be screened out for reasons such as having excessive cost or unavoidable impacts, not sufficiently addressing the identified problem or opportunity, or other factors. The study report should include some analysis of the eliminated alternatives and reasons for their elimination. The plans that are retained for additional analysis will comprise the range of reasonable alternatives required for the NEPA analysis. Section 234.8 describes the alternatives required in the final array.
(2) Consideration of nonstructural approaches and nature-based solutions that meet the planning objectives shall be an integral part of the development and evaluation of Federal investments in water resources.
(3) Each alternative formulated for the PR&G analysis should align with the alternatives evaluated in the corresponding NEPA document.
(4) The Corps should formulate the alternatives based on an incremental analysis of their benefits and costs to society. The economic, environmental, and social effects of a water resources development project are interrelated. In formulating alternatives to address the identified water resources problem or opportunity, the Corps shall consider each of these effects and seek to maximize net public benefits.
§ 234.7 Evaluation framework.
(a) General. To inform the overall decision-making process, this section describes the common framework and general requirements to be used by the Corps in evaluating and ensuring full consideration of the social, environmental, and economic benefits and costs to society of any separable elements and potential alternatives for Federal investment. This will include their performance with respect to the Guiding Principles and their contributions to the Federal Objective. Any key assumptions that affect the analysis of alternatives shall be clearly described in the study.
(b) Economic, environmental, and social effects. (1) The Corps' analytical framework for evaluating Federal investments should focus on the key economic, environmental, and social effects that are relevant to the investment decision. Typical NEPA analyses emphasize environmental effects and benefits, including ecosystem services, and these should also be used as a core part of water resources alternatives analysis. A benefit-cost analysis would be conducted for each alternative. Ecosystem services are an important benefit-cost category that should be included in the benefit-cost analysis.
(2) In addition, the scale of the analysis can be adjusted for a given study. While all analyses should share common elements, how these elements are achieved can depend on the identified problem or opportunity. It is important to establish a consistent analytic approach for each study. When implementing its ASPs, the Corps will consider and, where it deems appropriate, align with the latest Federal methods and guidance (for example, updated OMB Circulars and applicable interagency guidance) to ensure that the analytical framework accounts for all significant economic, environmental, and social costs and benefits, including ecosystem services. Where possible, monetization enables the incorporation of the values placed on the benefits and costs evaluated and provides a way to evaluate trade-offs in common analytical units (dollars). OMB Circulars A-4 and A-94 provide guidance on appropriate use of monetization methods. The Corps anticipates that it will not be possible to monetize all social and environmental costs and benefits of the alternatives. In these cases, the Corps should quantify the social and environmental costs and benefits and when neither monetization nor quantification is possible, the Corps should qualitatively describe the social and environmental costs and benefits in sufficient detail to allow differentiation across alternatives. Relevant monetary, quantitative, and descriptive information will be fully assessed and considered in the analysis.
(c) Best available actionable science and commensurate level of detail. (1) Analysis to support the evaluation of alternatives shall use the best available actionable science, to include Indigenous Knowledge, data, analytical techniques, procedures, models, and tools in ecology, hydrology, economics, engineering, biology, and other disciplines to the extent that sufficient funding is available, and to the extent such information is relevant and appropriate to the subject investment. To the extent feasible, the effects of the alternatives should be monetized. Effects will be monetized, quantified, or described, in that order.
(2) The level of detail required to support alternatives analysis may vary but should be sufficient to inform the decision-making process efficiently and effectively. The level of detail, scope, and complexity of analyses should be commensurate with the scale, impacts, costs, scientific complexities, uncertainties, risk, and other aspects (such as public concern) inherent in potential decisions.
(d) Risk and uncertainty. When analyzing potential Federal water resources investments, the Corps shall identify, describe, and quantify (if feasible) areas of risk and uncertainty and consider them in decision-making. Risks and uncertainties shall be identified and described in a manner that is clear and understandable to the public and decision-makers. This includes describing the nature, likelihood, and magnitude of risks, as well as the uncertainties associated with key supporting data, projections, and evaluations of competing alternatives. Risk and uncertainty are inherent in economic analyses as well as the analysis of physical and biological factors, no matter the technique or methodology employed. The study should estimate the extent to which the outcomes from an investment may vary over time from the estimates provided in the study, both in the short-term and in the less predictable future, due to uncertainty. Knowledge of risk and uncertainty and the degree of reliability of the estimated consequences will better inform decision-making. When there are considerable uncertainties concerning the ability of an alternative to function as desired (such as producing the desired outputs and/or the general acceptability of the alternative) the option of pursuing improved data or models should be considered. Reducing risk and uncertainty may involve increased costs or loss of benefits. The advantages and costs of reducing risk and uncertainty should be explicitly considered in formulating alternatives and the overall decision-making process.
(e) Adaptive management. Adaptive management measures shall be clearly identified and evaluated as part of alternatives to the extent that such measures are commensurate with the significance of the proposed activity and available resources. Adaptive management measures are particularly useful when making management choices in the face of uncertainty, such as when detailed information and tools are not readily available.
(f) Climate change. Conditions resulting from a changing climate shall be identified and accounted for in all stages of the planning process, and uncertainties associated with climate change will be identified and described. Analysis of climate change impacts shall reflect the best available actionable science and will leverage region-specific information from Federal, Tribal, State, local, and non-governmental partners. The Corps shall incorporate a climate-informed science approach considering impacts such as inland and coastal climate change impacts on flood and drought hazards using the most up-to-date science, policies, and tools available. The Corps shall also ensure climate resilience and adaptation are incorporated and considered throughout the planning process and across alternatives, including a discussion on how climate, drought, and ecosystem resilience may intersect for that particular action and can contribute to the economic vitality and water resources resilience of the Nation. The changing climate should inform the understanding of water resources needs and how those needs can potentially be addressed.
(g) Water availability, water uses, and resilience. The consideration of multiple uses, competing demands, and the potential future uses of the water resources shall be taken into account when formulating and evaluating solutions to a water resources problem or challenge. Water availability and efficient use of water shall be considered in designing the alternatives, as shall resilience, when applicable to the purpose of the study. The analysis shall consider water availability, water uses, and resilience over a range of conditions, from too little water in drought and multiple-use scenarios, to too much water in flood scenarios.
(h) Nonstructural and nature-based solutions. Nonstructural measures alter the use of existing infrastructure or human activities to generally improve, avoid, or minimize adverse changes to existing hydrologic, geomorphic, and ecological processes. Nonstructural measures may be combined with fewer or smaller traditional structural project components to produce a complete alternative plan or may be used instead of a structural project. In the development of alternatives, the use of natural systems, ecosystem processes, and nature-based solutions shall be considered. Full consideration and reporting on nonstructural and nature-based alternative actions shall be an integral part of the evaluation of Federal water resources investment alternatives, and a full nonstructural in addition to a full nature-based alternative will be included in the final array of alternatives. Nonstructural and nature-based aspects should also be included in the other alternatives in the final array when appropriate.
(i) Tribal treaty rights. Each of the alternatives considered for a water resources investment must be consistent with the protection of Tribal treaty rights. Alternatives that impact Tribal treaty and water rights should be screened out as soon as the Corps becomes aware of such impacts, and the study will document why the alternatives have been screened.
(j) State water law. Alternatives for water resources investments must be consistent with applicable State laws, including water rights and decrees, to the extent that these do not conflict with Federal laws and regulations. Analyses should identify legal constraints that preclude selection of an otherwise viable alternative.
(k) International obligations. Alternatives for water resources investments must be consistent with meeting treaty and other international obligations. Analyses should identify international obligations that preclude selection of an otherwise viable alternative.
(l) Period of analysis. The period of analysis for the study shall be documented with an appropriate justification, and used to evaluate each alternative.
§ 234.8 Final array of alternatives.
(a) Except as provided in paragraphs (c) and (f) of this section, the final array of alternatives shall include, at a minimum, the following six alternatives:
(1) A No Action alternative.
(2) A nonstructural alternative: An alternative that can effectively address the problem through the feasible use of nonstructural approaches.
(3) A nature-based solution alternative: An alternative that can effectively address the problem through the feasible use of nature-based solutions (including natural systems and ecosystem processes).
(4) An environmentally preferred alternative.
(5) An alternative that seeks to maximize net public benefits to society. In developing this alternative, the Corps shall not consider regional economic development effects.
(6) An alternative that is locally preferred. If this alternative differs from the net public benefits alternative, it will be required to have a comparable level of detail and analyzed using the same analytical framework as the net public benefits alternative.
(b) The nonstructural and nature-based alternatives do not preclude consideration of these elements in other alternatives. Nonstructural measures and nature-based solutions shall be considered as components of the other alternatives in the final array, essentially providing an integrated or “hybrid” of gray (hard) infrastructure with these other measures.
(c) The same alternative may be identified as more than one of these required alternatives.
(d) Mitigation of unavoidable adverse effects associated with each alternative must be included in the alternative and in the analyses.
(e) If an alternative requires changes in existing laws, regulations, or policies, those changes must be clearly identified and explained.
(f) If one or more of the required alternatives is not included because the Corps was not able to identify a potential solution that is feasible and consistent with the purpose of the study, the study must document that decision.
(g) The discussion of the final array of alternatives should include the primary purpose of the analysis; the geographic size of the study area; the types of impacts; the number of people potentially affected and anticipated degree of impact; environmental justice considerations; the size and location of communities potentially affected including the presence of Federally-recognized Tribes or Tribal members; and the type of data and information available from Indigenous Knowledge, collaboration, public involvement, and previous studies.
§ 234.9 Evaluate effects of alternatives.
(a) Analysis of alternatives. For the final array of alternatives, the analysis should describe, evaluate, and estimate the key social, environmental, and economic effects, and assess the contributions of each alternative to the Guiding Principles. The analysis should identify any impacts to Tribal treaty rights which were unknown earlier in the planning process and which prevent the selection of an alternative.
(b) Evaluation procedures. In addition to assessing how alternatives perform with respect to the Guiding Principles, the evaluation procedures shall incorporate methods to evaluate:
(1) How public benefits of an alternative compare to its costs, including full consideration of all important social, environmental, and economic benefits and costs.
(2) How alternatives perform against the objectives of the study.
(3) How alternatives perform against the four formulation criteria: completeness, effectiveness, efficiency, and acceptability.
(c) Consideration of benefits and costs. The report should fully account for the effects to society of alternative plans and their respective contributions to the Federal Objective, relative to the No Action alternative. The analysis will evaluate the economic benefits and costs, environmental benefits and costs, and social benefits and costs of alternatives, regardless of how they are included (monetized, quantified, or described). The consideration of benefits to federally recognized Tribes will be done in direct consultation with the respective Tribal Nation and will supplement the public benefit analysis. To the extent practicable, such costs and benefits must be quantified in a scientifically valid and acceptable way, and such quantified costs shall be monetized where practicable. When monetization or quantification is not possible, costs and benefits must be described in sufficient detail to enable the decision-maker to understand the importance and magnitude of potential changes. For monetized costs and benefits, the present value cost of each alternative must be compared to the present value of the benefit to the public. For quantified but not monetized benefits and costs, the Corps would present the information on an average annual basis, and would also describe how the benefits and costs would accrue over the period of analysis. For qualitatively described benefits and costs, expectations would be described across the period of analysis. The effects of alternative plans are displayed in terms of costs and benefits.
§ 234.10 Compare alternatives.
(a) Comparing alternatives. Alternatives shall be compared to each other and to the No Action alternative and shall include a comparison of the ability of the alternatives to perform under changing conditions, including climate change. The alternative (or alternatives) that reasonably meets the Federal Objective and maximizes net public benefits shall be identified. In addition, alternatives may be evaluated separately with respect to other considerations, including distributional effects. These considerations may include:
(1) Temporal factors, since certain effects may occur at different points in time.
(2) Spatial factors, since certain costs, benefits, and transfers may accrue to different regions. Regional-scale analyses may be useful to inform regional-level economic development objectives. It is important to note that such regional analyses, while useful, are completely separate from the calculation of net public benefits described in § 234.4(c).
(3) Beneficiaries. Tribal Nations and stakeholders (including other governmental agencies and communities with environmental justice concerns) may indicate different tradeoffs among the various benefits and costs of a Federal action. Tribal reserved rights, including treaty-protected resources and habitats, are not benefits to the Tribal Nation, rather, they are guaranteed by such treaties. Robust engagement at this stage shall focus on eliciting preferences among the alternatives, their component elements, and their effects. When calculating net benefits, these distributional effects can be examined using techniques like income weighting.
(b) Tradeoffs. Tradeoffs among potential alternatives will be assessed and described throughout the decision-making process and in a manner that informs decision-making. Based on the available analytical information, the Corps would use its professional judgment in making its recommendations on decisions among tradeoffs. The tradeoff displays shall be understandable, transparent, and constructed in a generally consistent fashion for all analyses. The analysis shall include a combination of both tables and explanatory materials to help inform a decision. Displays shall facilitate the evaluation and comparison of alternatives necessary to make the following determination and reflect the following:
(1) The effectiveness of alternatives in solving the water resources problem and taking advantage of the opportunities identified in the planning process.
(2) What must be given up in monetary and nonmonetary terms to enjoy the benefits of the various alternatives, relative to the baseline.
(3) The differences among alternatives.
(c) Information for inclusion in the analysis. To promote consistency across the Corps, the following tables and information shall be included in the analysis and documentation prepared for a decision process:
(1) Criteria. The analysis must explicitly address the extent to which an alternative achieves each of the following criteria: completeness, effectiveness, efficiency, and acceptability. This evaluation must be systematic and can include both quantitative and qualitative components.
(2) Effects matrix. A matrix summarizing the tradeoffs, relative to the baseline, effect-by-effect must be included in the integrated report.
(3) Additional trade-off displays. Additional text and tables should display other important trade-offs, such as trade-offs along temporal, spatial, and beneficiary dimensions.
(4) Summary table. A summary table displaying the economic, environmental, and social costs and benefits as measured (monetized, quantified, quantitative) for each alternative. In addition, the summary table will display the economic, environmental, and social costs and benefits which were derived qualitatively. The summary table will also separately include information on the level of risk or uncertainty for each alternative.
(5) Achievement of objectives table. A table indicating the extent to which the Guiding Principles have been achieved.
§ 234.11 Select the recommended plan.
(a) Recommended plan. (1) Plan selection will require decision-makers to assess tradeoffs and to consider the extent of both monetized and non-monetized effects. The basis for selection of the recommended plan should be fully reported and documented in a transparent manner, including the criteria and considerations used. This section must provide a discussion about the extent to which the alternatives achieve the Federal Objective and maximize net public benefits to society. The report must include an explanation of the assumptions in the evaluation of monetized and non-monetized benefits and costs. This section will include a summary of elicited Tribal Nation and stakeholder perspectives on the alternatives and their effects.
(2) The Corps should recommend:
(i) Authorization of an alternative project, program, or plan;
(ii) Implementation of an alternative under existing law;
(iii) Implementation of a project, program or plan by others; or
(iv) No action.
(3) In its studies, the Corps shall analyze, evaluate, fully consider, and justify each separable element of the proposed investment independently of the other separable elements, based on its social, environmental, and economic benefits and costs to society.
(4) The Corps should seek to meet water resources objectives and maximize net public benefits, relative to public costs. It is possible that more than one alternative might reasonably and approximately meet these conditions. “Net public benefits” implies that the anticipated benefits will be presented relative to the costs associated with the accrual of those benefits. Net public benefits can include both quantified and non-quantified benefits. Any recommendation will clearly delineate the Federal water resources project(s) or actions being recommended, including any condition precedent for construction.
(b) Exceptions. A recommended plan for a Federal water resources investment that does not maximize net public benefits requires an exception from the Assistant Secretary of the Army for Civil Works. Requests for exception should describe the project or activity, the rationale for the exception, and present relevant data and analysis to support the request.
PART 238 WATER RESOURCES POLICIES AND AUTHORITIES: FLOOD DAMAGE REDUCTION MEASURES IN URBAN AREAS
Authority: Pub. L. 738, 74th Congress, 33 U.S.C. 701a.
Source: 45 FR 71801, Oct. 30, 1980, unless otherwise noted.
§ 238.1 Purpose.
This regulation provides policies and guidance for Corps of Engineers participation in urban flood damage reduction projects and establishes criteria to distinguish between improvements to be accomplished by the Corps under its flood control authorities and storm sewer systems to be accomplished by local interests.
§ 238.2 Applicability.
This regulation is applicable to all OCE elements and all field operating activities having Civil Works responsibilities.
§ 238.3 References.
(a) Executive Order 11988—Floodplain Management, dated 24 May 1977.
(b) U.S. Water Resources Council, Floodplain Management Guidelines, (43 FR 6030), to February 1978.
(c) ER 1105-2-811.
(d) ER 1140-2-302.
(e) ER 1140-2-303.
(f) EP 1165-2-2.
§ 238.4 Definitions.
For purposes of this regulation the following definitions apply:
(a) Urban areas are cities, towns, or other incorporated or unincorporated political subdivisions of States that:
(1) Provide general local government for specific population concentrations, and,
(2) Occupy an essentially continuous area of developed land, containing such structures as residences, public and commercial buildings, and industrial sites.
(b) Flood damage reduction works in urban areas are the adjustments in land use and the facilities (structural and non-structural) designed to reduce flood damages in urban areas from overflow or backwater due to major storms and snowmelt. They include structural and other engineering modifications to natural streams or to previously modified natural waterways. Flood damage reduction works are designed to modify flood behavior typified by temporary conditions of inundation of normally dry land from the overflow of rivers and streams or from abnormally high coastal waters due to severe storms.
(c) Storm sewer systems are the facilities in urban areas designed to collect and convey runoff from rainfall or snowmelt in the urban area to natural water courses or to previously modified natural waterways. They include storm drains, inlets, manholes, pipes, culverts, conduits, sewers and sewer appurtenances, on-site storage and detention basins, curbs and gutters, and other small drainageways that remove or help to manage runoff in urban areas. Storm sewer systems are designed to solve storm drainage problems, which are typified by excessive accumulation of runoff in depressions; overland sheet flow resulting from rapid snowmelt or rainfall; and excessive accumulation of water at the facilities listed in this paragraph because of their limited capacity.
§ 238.5 Comprehensive planning.
Coordinated comprehensive planning at the regional or river basin level, or for an urban or metropolitan area, can help to achieve solutions to flood problems that adequately reflect future changes in watershed conditions, and help to avoid short-sighted plans serving only localized situations. This planning is particularly important in areas where significant portions of a watershed are expected to be urbanized in the future. Changes in land use may result in major alterations of the runoff characteristics of the watershed. Hydrologic changes must be projected for the period of analysis. In this effort, responsible local planning organizations should provide information and assist the Corps in development of projected land uses and expected practices for collection and conveyance of runoff over the period of analysis. Conversely, the Corps may be able to provide non-Federal interests with valuable information about water related consequences of alternative land uses and drainage practices.
§ 238.6 General policy.
(a) Satisfactory resolution of water damage problems in urban areas often involves cooperation between local non-Federal interests and the Federal flood control agencies. In urban or urbanizing areas, provision of a basic drainage system to collect and convey the local runoff to a stream is a non-Federal responsibility. This regulation should not be interpreted to extend the flood damage reduction program into a system of pipes traditionally recognized as a storm drainage system. Flood damage reduction works generally address discharges that represent a serious threat to life and property. The decision criteria outlined below therefore exclude from consideration under flood control authorities small streams and ditches with carrying capacities typical of storm sewer pipes. Location of political boundaries will not be used as a basis for specifying project responsibility. Project responsibilities can be specified as follows:
(1) Flood damage reduction works, as defined in this regulation, may be accomplished by the Corps of Engineers.
(2) Construction of storm sewer systems and components thereof will be a non-Federal responsibility. Non-Federal interests have a responsibility to design storm sewer systems so that residual damages are reduced to an acceptable level.
(b) Consideration will be given to the objectives and requirements of Executive Order 11988 (reference § 238.3(a)) and the general guidelines therefor by the U.S. Water Resources Council (reference § 238.3(b)).
§ 238.7 Decision criteria for participation.
(a) Urban flood control. (1) Urban water damage problems associated with a natural stream or modified natural waterway may be addressed under the flood control authorities downstream from the point where the flood discharge of such a stream or waterway within an urban area is greater than 800 cubic feet per second for the 10-percent flood (one chance in ten of being equalled or exceeded in any given year) under conditions expected to prevail during the period of analysis. Those drainage areas which lie entirely within the urban area (as established on the basis of future projections, in accordance with § 238.5 of this part), and which are less than 1.5 square miles in area, shall be assumed to lack adequate discharge to meet the above hydrologic criteria. Those urban streams and waterways which receive runoff from land outside the urban area shall not be evaluated using this 1.5 square mile drainage area criterion.
(2) A number of conditions within a drainage area may limit discharges for the 10-percent flood, without proportionately reducing discharges for larger floods, such as the one-percent flood. Examples include the presence of extremely pervious soils, natural storage (wetlands) or detention basins or diversions with limited capacity. Other conditions could result in a hydrological disparity between the 10- and one-percent flood events.
(3) Division Engineers, except for NED and POD, are authorized to grant exceptions to the 800 cfs, 10-percent flood discharge criterion specified in this § 238.7(a)(1) whenever both of the following criteria are met:
(i) The discharge for the one-percent flood exceeds 1800 cfs; and
(ii) The reason that the 10-percent flood discharge is less than 800 cfs is attributable to a hydrologic disparity similar to those described in § 238.7(a)(2).
Requests for exceptions to the hydrologic criterion contained in § 238.7(a)(1) from NED and POD should be submitted to HQDA (DAEN-CWP) WASH DC 20314.
(4) Flood damage reduction works must conform to the definition in § 238.4(b) and must be justified based on Corps of Engineers evaluation procedures in use at the time the evaluation is made. Flood reduction measures, such as dams or diversions, may be located upstream of the particular point where the hydrologic criteria (and area criterion, if appropriate) are met, if economically justified by benefits derived within the stream reach which does qualify for flood control improvement. Similarly, the need to terminate flood control improvements in a safe and economical manner may justify the extension of some portions of the improvements, such as levee tiebacks, into areas upstream of the precise point where Federal flood control authorities become applicable.
(b) Storm sewer system. Water damage problems in urban areas not consistent with the above criteria for flood control will be considered to be a part of local storm drainage to be addressed as part of the consideration of an adequate storm sewer system. The purpose of this system is to collect and convey to a natural stream or modified natural waterway the runoff from rainfall or snowmelt in the urbanized area.
(c) Man-made conveyance structures. (1) Man-made conveyance structures will be assumed to be a part of storm sewer systems except when: (i) A natural stream has been or is to be conveyed in the man-made structure; or (ii) The man-made structure is a cost-effective alternative to improvement of a natural stream for flood damage reduction purposes or is an environmentally preferable and economically justified alternative. Water damage associated with inadequate carrying capacity of man-made structures should be designated as a flood problem or a local drainage problem in a manner consistent with the structure's classification as flood damage reduction works or a part of a storm sewer system.
(2) Man-made structures that convey sanitary sewage or storm runoff, or a combination of sanitary and storm sewage, to a treatment facility will not be classified as flood damage reduction works. Flows discharged into a natural or previously modified natural waterway for the purpose of conveying the water away from the urbanized area will be assumed to be a part of the flow thereof regardless of quality characteristics.
(d) Joint projects. Certain conditions may exist whereby the Corps of Engineers and the Department of Housing and Urban Development (HUD), or another Federal agency, could jointly undertake a project that would be impractical if one agency were to undertake it alone. The Corps may, for example, under provisions of Section 219 of the Flood Control Act of 1965, design or construct a project that is part of a larger HUD plan for an urban area (see ER 1140-2-302). Such efforts should be undertaken only when requirements cannot be handled better by one agency acting alone. If a joint effort is preferable, then the Corps may participate as required.
(e) Disagreements. If a disagreement arises between the Corps and another Federal agency that cannot be resolved at the field level, the matter will be forwarded to HQDA (DAEN-CWR) WASH DC 20314 for guidance.
§ 238.8 Other participation.
In addition to providing flood damage reduction works in urban areas, the Corps may provide related services to State and local governments on a reimbursable basis. Under Title III of the Inter-governmental Cooperation Act of 1968, specialized or technical services for which the Corps has specific expertise may be furnished only when such services cannot be procured reasonably and expeditiously from private firms (see ER 1140-2-303).
§ 238.9 Local cooperation.
(a) Cost sharing and other provisions of local cooperation shall be in conformity with applicable regulations for structural and non-structural flood damage reduction measures.
(b) Responsible non-Federal entities will be required to provide satisfactory assurances that they will adopt, enforce, and adhere to a sound, comprehensive plan for flood plain management for overflow areas of communities involved. To this end, District Engineers will inform HUD, and other concerned Federal and non-Federal planning and governing agencies, of flood plain management services available under Section 206 of the Flood Control Act of 1960, as amended (33 U.S.C. 709a).
§ 238.10 Coordination with other Federal agencies.
In conducting flood damage reduction studies, reporting officers shall comply with the 1965 Agreement between the Soil Conservation Service and the Corps (contained in EP 1165-2-2) in determining the responsible Federal agency. Corps personnel should also keep abreast of the public works programs administered by other Federal agencies, such as the Environmental Protection Agency, the Department of Housing and Urban Development, Farmers Home Administration and the Department of Commerce, in order to coordinate flood control improvements with storm sewer system improvements and to avoid program overlap. Coordination of planning activities with A-95 clearinghouses will help to achieve this objective (see ER 1105-2-811).
PART 241 FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY TO PAY PROVISION
Authority: Sec. 103(m), Pub. L. 99-662, 100 Stat. 4082 (33 U.S.C. 2201 et seq.), as amended by Sec. 201, Pub. L. 102-580, 106 Stat. 4797 (33 U.S.C. 2201 et seq.)
Source: 54 FR 40581, Oct. 2, 1989, unless otherwise noted.
§ 241.1 Purpose.
This rule gives general instructions on the implementation of section 103(m) of the Water Resources Development Act of 1986, Public Law 99-662, as amended by section 201 of the Water Resources Development Act of 1992, Public Law 102-588, for application to flood control projects.
[60 FR 5133, Jan. 26, 1995]
§ 241.2 Applicability.
This rule applies to all U.S. Army Corps of Engineers Headquarters (HQUSACE), elements and Major Subordinate Commands and District Commands of the Corps of Engineers having Civil Works Responsibilities.
[60 FR 5133, Jan. 26, 1995]
§ 241.3 References.
References cited in paragraphs (f) thru (i) may be obtained from USACE Pub. Depot, CEIM-SP-D, 2803, 52d Avenue, Hyattsville, MD 20781-1102. References cited in paragraphs (d) and (e) may be obtained from the National Information Services, 5285 Port Royal Road, Springfield, VA 22161. References (a), (b) and (c) may be reviewed in your local library or by writing your local Congressperson.
(a) Water Resources Development Act, 1986, Public Law 99-662, 100 Stat. 4082, 33 U.S.C. 2201 et seq.
(b) Water Resources Development Act 1992, Public Law 102-580, 106 Stat. 4797, 33 U.S.C. 2201 et seq.
(c) U.S. Water Resources Council, Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies, March 10, 1983.
(d) Office of Personnel Management, FPM Bulletin 591-30.
(e) Office of Personnel Management, FPM 591-32.
(f) U.S. Army Corps of Engineers, Engineer Regulation 1165-2-29.
(g) U.S. Army Corps of Engineers, Engineer Regulation 1165-2-121.
(h) U.S. Army Corps of Engineers, Engineer Regulation 1165-2-131.
(i) U.S. Army Corps of Engineers, Engineer Regulation 405-1-12.
[60 FR 5133, Jan. 26, 1995]
§ 241.4 General policy.
(a) Procedures described herein establish an “ability to pay” test which will be applied to all flood control projects. As a result of the application of the test, some projects will be cost-shared by the non-Federal interest at a lower level than the standard non-Federal share that would be required under the provisions of section 103 of Pub. L. 99-662, 33 U.S.C. 2213. The “standard share”, as used herein, refers to the non-Federal share that would apply to the project before any ability to pay consideration.
(b) Section 103(m) requires that all cost-sharing agreements for flood control covered by the terms of section 103(a) or 103(b) be subject to the ability to pay test. The test must therefore be applied not only to projects specifically authorized by Congress, but to the continuing authority projects constructed under section 14 of the 1946 Flood Control Act (33 U.S.C. 701r), section 205 of the 1948 Flood Control Act (33 U.S.C. 701s), and section 208 of the 1954 Flood Control Act (33 U.S.C. 701g), all as amended.
(c) The ability to pay test shall be conducted independently of any analysis of a project sponsor's ability to finance its ultimate share of proposed project costs. The ability to finance is addressed in a statement of financial capability which considers current borrowing constraints, alternative sources of liquidity, etc. It is therefore much more narrowly defined than the ability to pay test, which considers the underlying resource base of the community as a whole. The ability to pay test shall not be used to affect project scope, or to change budgetary priorities among projects competing for scarce Federal funds.
(d) Any reductions in the level of non-Federal cost-sharing as a result of the application of this test will be applied to construction costs only. Operations, maintenance and rehabilitation responsibilities are unaffected by the ability to pay test.
(e) When projects are eligible for credits as outlined in ER 1165-2-29, reference § 241.3(e), the ability to pay test will be applied before any adjustments are made for credits. If the ability to pay test results in a lower non-Federal share, the allowable amount of credits will be limited by the lower share.
(f) The test is based on the following principles:
(1) Since the standard non-Federal cost-share is substantially less than full costs in every case, the ability to pay test should be structured so that reductions in the level of cost-sharing will be granted in only a limited number of cases of severe economic hardship.
(2) The test should depend not only on the economic circumstances within a project area, but also on the conditions of the state(s) in which the project area is located. Although states' policies with respect to supporting local interests on flood control projects are not uniform, the state represents a potential source of financial assistance which should be considered in the analysis.
(3) The alternative level of cost-sharing determined under the ability to pay principle should be governed in part by project benefits. If, as a result of the project, local beneficiaries receive more income, or are required to use fewer resources on flood damage repair or replacement, or on flood insurance, a portion of these resources should be available to pay for the non-Federal share, even in those cases where an analysis of current economic conditions indicates that there are relatively limited resources in the project area and its state.
(4) Since project benefits represent availability of resources in the future, but not the present, project sponsors should be permitted to defer a certain percentage of the non-Federal share whenever current economic circumstances suggest that non-Federal resources may be limited.
(g) The Non-Federal interest may, at its discretion, waive the application of the ability to pay test. In this case, the Non-Federal interest shall be considered to have the ability to pay the standard cost-share and no further economic inquiry will be required.
§ 241.5 Procedures for estimating the alternative cost-share.
(a) Step one, the benefits test. Determine the maximum possible reduction in the level of non-Federal cost-sharing for any project.
(1) Calculate the ratio of flood control benefits (developed using the Water Resources Council's Principles and Guidelines—ref. § 241.3(b)) to flood control costs for the project based on the discount rate which the Corps is currently using to evaluate projects. Costs include operations and maintenance as well as first costs. Divide the result by four. For example, if the project's (or separable element's) benefit-cost ratio is 1.2:1, the factor for this project equals 0.3. If a project has been authorized for construction without a benefit-cost ratio calculated in accordance with the Principles and Guidelines, determination of the ratio is a prerequisite for consideration under the ability to pay provision.
(2) If the factor determined in § 241.5(a)(1), when expressed as a percentage, is greater than the standard level of cost-sharing, the standard level will apply.
(3) If the factor determined in § 241.5(a)(1), when expressed as a percentage, is less than the standard level of cost-sharing, projects may be eligible for either a reduction in the non-Federal share to this “benefits based floor” (BBF), or for a partial reduction to a share between the standard level and the BBF, as determined by the procedures in step two, § 243.5. In no case however, will the non-Federal cost-share be less than five percent.
(b) Step two, the income test. Projects may qualify for the full amount of the reduction in cost-sharing calculated in Step one, or for some fraction of the reduction in cost-sharing, depending on a measure of the current economic resources of the project area and of the state or states in which the project is located.
(1) To assure consistency, the calculations in § 241.5(b) (2) and (3) will be performed by HQUSACE and distributed to all FOA's via Engineering Circulars. The information will be updated and distributed to HQUSACE and to the field as soon as new data are available. The procedures may be verified for any single county or state using the sources cited.
(2) For each of the three latest calendar years for which information is available, determine the level of per capita personal income in the state in which the project beneficiaries are located, and compare this to the national average of per capita personal income. Source: Dept. of Commerce, Bureau of Economic Analysis, as published yearly in the April Survey of Current Business. (If the project beneficiaries are located in Alaska or Hawaii, divide the per capita personal income figure by one plus the percentage used in the Federal Government's cost of living pay differential for Federal workers who purchase local retail and who use private housing, employed in Anchorage, AK or Oahu, HI as contained in References § 241.3(c) and (d).) Determine the state's per capita personal income as an index number in comparison to the national average (U.S. = 100), and calculate the three year average of the state's index number.
(3) For each of the three latest calendar years for which information is available, determine the level of per capita personal income in the county where the project beneficiaries are located (the “project area”), and compare this to the national average of per capita personal income. Source: Dept. of Commerce, Bureau of Economic Analysis, as published yearly in the April Survey of Current Business. (If the project beneficiaries are located in Alaska or Hawaii, divide the county's per capita personal income figure by one plus the percentage used in the Federal Government's cost of living pay differential for Federal workers who purchase local retail and who use private housing, employed in Anchorage, AK or Oahu, HI.) Calculate the index for the county's per capita personal income to the national average (U.S. = 100), and calculate the three year average of the county's index number.
(4) When the project area, as determined by the location of the project's beneficiaries, includes more than one county, calculate a composite project area index by taking a weighted average of the county index numbers, the weights being equal to the relative levels of benefits received in each county. When the project area includes more than one state, the state index for the project should be calculated using the same weighting technique.
(5) Calculate an “Eligibility Factor” for the project according to the following formula:
EF = a − b1 × (state factor) − b2 × (area factor).
If EF is one or more, the project is eligible for the full reduction in cost-share to the benefits based floor. If EF is zero or less, the project is not eligible for a reduction. If EF is between zero and one, the non-Federal cost-share will be reduced proportionately to an amount which is greater than the BBF but less than the standard non-Federal cost-share in accordance with the procedures described in paragraph § 241.5(c) of this part. The values of a, b1 and b2 will be determined by HQUSACE. The parameter values will be based on the latest available data and set so that 20 percent of counties have an EF of 1.0 or more, while 66.7 percent have an EF of 0 or less. These values will be adjusted periodically as new information becomes available. Changes will be published in Engineering Circulars. The values will be set so that b2 = 2 × b1, giving local income twice the weight of state income.
(6) Since estimates (available from the Bureau of Economic Analysis) of per capita personal income for Puerto Rico, Guam and other U.S. territories are well below the national average, the eligibility factor for projects in these areas is administratively established to be equal to 1.
(7) For flood control projects sponsored by Native American tribes or villages, the EF shall be calculated using information on tribe or village income as a replacement factor for both the area and state factor (that is multiply the replacement income factor by both b1 and b2 and subtract each from a in the equation in § 241.5(b)(5)). The replacement factor will be tribe or village income as a percentage of the national average for the equivalent definition of income (for example a Tribe's median family income as a percentage of the median family income for all U.S. families). The data should be the latest available information. It is acceptable, but not required that the data be obtained from the Bureau of the Census, American Indians, Eskimos and Aleuts on Identified Reservations and in Historic Areas of Oklahoma (Excluding Urbanized Areas), part 1, Table 10, or General Social and Economic Characteristics—United States Summary (1980), Table 252. Since both sources contain information for Native Americans living on reservations, rather than all Tribe or Village members, the sources should be used only when appropriate, or when no better information is available.
(c) Application of the Ability to Pay Formula to the Basic Cost-sharing Provisions of Section 103. If a flood control project has a BBF which is less than the standard cost-share and an EF which is greater than zero, the non-Federal cost-share will be reduced. The alternative non-Federal share will be calculated and reported to the nearest one tenth of one percent. The actual reduction is determined by applying the ability to pay formula to the basic flood control cost-sharing provisions of section 103 of Pub. L. 99-662, 33 U.S.C. 2213, as follows:
(1) When EF ≥1, non-Federal cost-share = BBF
(2) For structural projects covered by section 103(a), when 0 <EF <1:
(i) If LERRD equals or exceeds 45 percent:
non-Federal cost-share = 50 − EF × (50 − BBF)
(ii) If LERRD exceeds 20 percent but is less than 45 percent:
non-Federal cost-share = (LERRD + 5) − ER × [(LERRD + 5) − BBF]
(iii) If LERRD is less than 20 percent:
non-Federal cost-share = 25 − EF × (25 − BBF)
(3) For non-structural projects covered by section 103(b), when 0 <EF <1:
non-Federal cost-share = 25 − EF × (25 − BBF)
(4) In no case however, can the non-Federal share be less than five percent, even if the calculation made in § 241.5(c) (1), (2), or (3) results in a smaller number.
(5) Note: LERRD equals the costs of lands, easements, rights-of-way, relocations, and dredged material disposal areas expressed as a percentage of total project costs. The BBF and numerical terms in the equations above are also expressed as percentages.
(d) Additional consideration for high cost projects. For any project where the normal non-Federal share exceeds 35 percent, and the per capita non-Federal cost (i.e., normal non-Federal share of total construction costs divided by the population in the sponsor's geographic jurisdiction) exceeds $300, the non-Federal share under the ability to pay provision will be either LERRD's (i.e., no cash requirement) or 35 percent, whichever is greater. If LERRD's exceed 50 percent, the non-Federal share remains at 50 percent. Projects which qualify under the benefits and income tests will receive the reduction under the high cost criteria only if the high cost criteria results in a greater reduction in the non-Federal cost share.
[54 FR 40581, Oct. 2, 1989, as amended at 60 FR 5134, Jan. 26, 1995]
§ 241.6 Deferred payments for certain qualifying projects.
(a) Whenever a project's Eligibility Factor exceeds zero, the project sponsor will be permitted to defer a portion of its share of flood control costs. The maximum allowable amount deferred equals the total non-Federal share less (for structural projects) five percent of total project costs and less (for all projects) any amounts for LERRD paid for or acquired by the sponsor prior to the time the PCA is signed. If for example, the non-Federal share of a structural project = 35.0 percent (after the ability to pay adjustment, if any) of which 10 percent is LERRD already paid for by the local sponsor, the maximum allowable amount to be deferred = 20 percent of project flood control costs (35 less the 5 percent cash requirements, less the 10 percent LERRD already acquired). Deferred payments at the option of the sponsor will be allowed regardless of the outcome of the benefits test described in § 241.5(a) whenever the Eligibility Factor exceeds zero.
(b) When EF ≥1, the project sponsor may defer as much as the maximum allowable amount as described in § 241.6(a).
(c) When 0 <EF <1, the sponsor may defer a fraction of the maximum allowable amount described in § 241.6(a), where the fraction equals the Eligibility Factor expressed to three decimal places. Continuing the example described in § 241.6(a), if EF = .712, total allowed deferral equals .712 × 20 percent = 14.2 percent of total project costs.
(d) The deferred payment can be made in equal installments over any period of time selected by the non-Federal sponsor, provided that all repayments are made between the end of construction and thirty years thereafter. The amount repaid shall include interest during the repayment period as well as interest for the appropriate portion of the construction period for any amounts deferred prior to the end of construction. The rate of interest shall be determined in accordance with the provisions of section 106 of Pub. L. 99-662, 33 U.S.C. 2216.
[54 FR 40581, Oct. 2, 1989, as amended at 60 FR 5134, Jan. 26, 1995]
§ 241.7 Application of test.
(a) A preliminary ability to pay test will be applied during the study phase of any proposed project. If the ability to pay cost-share is lower than the standard share, the revised estimated cost-share will be used for budgetary and other planning purposes.
(b) The official application of the ability to pay test will be made at the time the Project Cooperation Agreement (PCA) between the Corps of Engineers and the Non-Federal sponsor is signed. For structural flood control projects, the standard level of cost-sharing will not be known until the end of the project (since the standard level as specified in section 103(a), 33 U.S.C. 2213, includes LERRD). In this case, if the Eligibility Factor is greater than zero but less than one, the ability to pay non-Federal share will be determined using estimated costs.
(c) The PCA for all projects subject to the ability to pay test will include a “whereas” clause indicating the results of the test. If the project is eligible for a lower non-Federal share:
(1) The revised share will be specified in the PCA (there will be no recalculation of this share once the PCA is signed).
(2) An exhibit attached to the Project Cooperation Agreement (PCA) will include the Benefits Based Floor (BBF) determined in § 241.5(a): the Eligibility Factor (EF) determined in § 241.5(b): If the Eligibility Factor is greater than zero but less than one, the estimated standard non-Federal share; the formula used in determining the ability to pay share as described in § 241.5(c)(1) through (c)(4); and a display of the non-Federal cost share under the high cost criteria described in § 241.5(d).
(d) If at the time of project completion, the standard non-Federal share based on actual costs is less than the ability to pay share specified in the PCA, the standard share will apply.
(e) For structural projects. (1) If the standard LERRD plus cash requirement exceeds the ability to pay cost-share, the Federal Government will make any necessary adjustments in expenditures in the following order: First, paying any cash requirement in excess of five percent of total project costs (if any) that would, under standard cost-sharing, have been the responsibility of the non-Federal sponsor; second, making payments for LERRD; and third, providing for reimbursement at the end of construction. Federal payments for LERRD will be made only after the non-Federal payment for LERRD reaches a percentage of total project costs equal to the ability to pay non-Federal cost-share less the five percent cash requirement. If such arrangements are necessary, the PCA should be prepared to reflect agreement on the best manner available for acquisition of those LERRD over the limiting percentage, or for reimbursing the sponsor upon completion of construction.
(2) The non-Federal sponsor will be required to provide a cash payment equal to the minimum of five percent of estimated project costs, regardless of the outcome of the ability to pay test, unless any or all of the five percent cash requirement is waived by application of the high cost criteria described in § 241.5(d). The project sponsor shall make cash payments during construction at a rate such that the amount of non-Federal payments in each year, as a percentage of total non-Federal cash payments, equals the amount of Federal expenditures (including sunk pre-construction engineering and design costs as a first year Federal construction expenditure) as a percentage of total Federal expenditures. Total Federal expenditures include cash payments for construction and if necessary (due to ability to pay considerations), for LERRD, and for reimbursement to the non-Federal sponsor. Total Federal expenditures for the purpose of this calculation, do not include expenditures which allow the non-Federal sponsor to defer payment of the non-Federal share under the provisions of this rule.
(f) For non-structural projects, reductions in the non-Federal cost-share as a result of the ability to pay test will not affect the procedures for determining the non-Federal and Federal payment schedules. For non-structural projects, no specific cash payments during construction are required by law.
[54 FR 40581, Oct. 2, 1989, as amended at 60 FR 5134, Jan. 26, 1995]
PART 242 FLOOD PLAIN MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY
Authority: Section 321 of Pub. L. 101-640, 74 Stat. 500 (33 U.S.C. 709a).
Source: 56 FR 54712, Oct. 22, 1991, unless otherwise noted.
§ 242.1 Purpose.
This part gives general instructions on the implementation of section 321 of Public Law 101-640, 74 Stat. 500 (33 U.S.C. 709a) as it applies to the use of a Fee Schedule for recovering the cost of providing Flood Plain Management Services to Federal agencies and private persons.
§ 242.2 Applicability.
This part applies to all HQUSACE elements, Major Subordinate Commands, and District Commands of the Corps of Engineers having Civil Works responsibilities.
§ 242.3 References.
The references in paragraphs (b) and (c) of this section may be obtained from USACE Pub. Depot, CEIM-SP-D, 2803 52d Avenue, Hyattsville, MD 20781-1102.
(a) Section 321, Public Law 101-640, 74 Stat. 500 (33 U.S.C. 709a).
(b) Corps of Engineers Engineering Regulation 1105-2-100, Planning Guidance Notebook.
(c) Corps of Engineers Engineering Pamphlet 37-1-4, Cost of Doing Business.
§ 242.4 Definitions.
As used in this part:
Private persons means all entities in the private sector, including but not limited to individuals, private institutions, sole proprietorships, partnerships, and corporations.
Total cost means total labor charges which include adjustments for benefits, administrative overhead, and technical indirect costs. These terms are described in the reference in § 242.3 (c).
§ 242.5 General.
(a) The Corps of Engineers Flood Plain Management Services Program provides a wide range of flood plain and related assistance upon request. Depending on the complexity of the request, either a nonnegotiated Fee Schedule or a negotiated agreement will be used to recover the cost of services provided to Federal agencies and private persons. This part involves only the nonnegotiated Fee Schedule.
(b) State, regional, or local governments or other non-Federal public agencies will be provided Flood Plain Management Services without charge.
§ 242.6 Fee schedule.
(a) General. The Fee Schedule described in this section will be used to recover the cost for Flood Plain Management Services requiring more than ten minutes and up to one work day to provide. The Fee Schedule has been designed to minimize administrative costs and to allow the flexibility needed to recover the approximate total costs for services provided to Federal agencies and private persons.
(b) Level of effort. For establishing charges, services covered by the Fee Schedule have been divided into five levels as follows:
(1) Level 1 includes the provision of basic information from readily available data that does not require technical evaluation or documentation and is transmitted by form letter to the customer.
(2) Level 2 includes the provision of information from readily available data that requires minimal technical evaluation and is transmitted by form letter to the customer.
(3) Level 3 includes the provision of information that requires some file search, a brief technical evaluation, and documentation of results by a form letter or brief composed letter to the customer.
(4) Level 4 includes the provision of information and assistance that requires moderate file search, a brief technical evaluation, and documentation of results in a composed letter to the customer.
(5) Level 5 includes the provision of information and assistance that requires significant file search or retrieval of archived data, a moderate technical evaluation, and documentation of results in a brief letter report to the customer.
(c) Charge determination. The Fee Schedule will be used Corps-wide. As requests are received, the responding office will select the appropriate level on the Fee Schedule to determine the charge for providing the service.
(d) Provision of services. The services will be provided on a first-come, first-served basis after payment has been received.
(e) Fees. The Fee Schedule, including a brief description of the services in each of the five levels and the related charges, is shown in Table 1 to this section. The fee for each level is based on a Corps-wide average of estimated current costs for providing that level of service.
(f) Review and revision of fees. The fees shown in the Fee Schedule will be reviewed each fiscal year using the most current cost data available. If necessary, the Fee Schedule will be revised after public notice and comment.
Table 1 to § 242.6—Fee Schedule; Standard Corps-Wide Charges for FPMS Tasks Requiring More Than Ten Minutes and Up to One Day
Level | Description of work | Fee
1 | Basic information from readily available data that does not require technical evaluation or documentation and is transmitted by form letter | $25
2 | Information from readily available data that requires minimal technical evaluation which is transmitted by form letter | 55
3 | Information that requires some file search, brief technical evaluation, and documentation of results by a form letter or by a brief composed letter | 105
4 | Information and assistance that re- quires moderate file search, brief technical evaluation, and documentation of results in a composed letter | 165
5 | Information and assistance that re- quires significant file search or retrieval of archived data, moderate technical evaluation, and documentation of results in a brief letter report | 325
PART 245 REMOVAL OF WRECKS AND OTHER OBSTRUCTIONS
Authority: 5 U.S.C. 301; 33 U.S.C. 1, 409, 411-415; 10 U.S.C. 3012.
Source: 53 FR 27513, July 21, 1988, unless otherwise noted.
§ 245.1 Purpose.
This part describes administrative procedures and policy used by the Corps of Engineers in exercising its authority for wreck removal. Procedures are intended to insure that the impacts of obstructions are minimized, while recognizing certain rights of owners, operators and lessees.
§ 245.3 Applicability.
(a) These procedures apply to the removal of wrecks or other obstructions within the navigable waters of the United States, as defined in part 329 of this chapter.
(b) This part does not apply to the summary removal or destruction of a vessel by the Coast Guard under authority of the Clean Water Act (33 U.S.C. 1321), or to any removal actions involving obstructive bridges which are subject to separate regulation under part 114 of this title.
(c) For vessels which were sunk or wrecked prior to November 17, 1986, the statutory obligation to remove belongs solely to the owner (not the operator or lessee), and the owner's obligation to reimburse the U.S. Treasury for federal removal is limited to cases of voluntary or careless sinking.
§ 245.5 Definitions.
Abandonment means the surrendering of all rights to a vessel (or other obstruction) and its cargo by the owner, or owners if vessel and cargo are separately owned.
Hazard to navigation is an obstruction, usually sunken, that presents sufficient danger to navigation so as to require expeditious, affirmative action such as marking, removal, or redefinition of a designated waterway to provide for navigational safety.
Obstruction is anything that restricts, endangers or interferes with navigation.
Responsible party means the owner of a vessel and/or cargo, or an operator or lessee where the operator or lessee has substantial control of the vessel's operation.
Vessel as used in this part includes any ship, boat, barge, raft, or other water craft.
§ 245.10 General policy.
(a) Coordination with Coast Guard. The Corps of Engineers coordinates its wreck removal program with the Coast Guard through interagency agreement, to insure a coordinated approach to the protection of federal interests in navigation and safety. Disagreements at the field level are resolved by referral to higher authority within each agency, ultimately (within the Corps of Engineers) to the Director of Civil Works, who retains the final authority to make independent determinations where Corps responsibilities and activities are affected.
(b) Owner responsibility. Primary responsibility for removal of wrecks or other obstructions lies with the owner, lessee, or operator. Where an obstruction presents a hazard to navigation which warrants removal, the District Engineer will attempt to identify the owner or other responsible party and vigorously pursue removal by that party before undertaking Corps removal.
(c) Emergency authority. Obstructions which impede or stop navigation; or pose an immediate and significant threat to life, property, or a structure that facilitates navigation; may be removed by the Corps of Engineers under the emergency authority of section 20 of the Rivers and Harbors Act of 1899, as amended.
(d) Non-emergency situations. In other than emergency situations, all reported obstructions will be evaluated jointly by the District Engineer and the Coast Guard district for impact on safe navigation and for determination of a course of action, which may include the need for removal. Obstructions which are not a hazard to general navigation will not be removed by the Corps of Engineers.
(e) Corps removal. Where removal is warranted and the responsible party cannot be identified or does not pursue removal diligently, the District Engineer may pursue removal by the Corps of Engineers under section 19 of the Rivers and Harbors Act of 1899, as amended, following procedures outlined in this CFR part.
§ 245.15 Delegation.
District Engineers may undertake removal without prior approval of the Chief of Engineers provided the cost does not exceed $100,000. Removals estimated to cost above $100,000 require advance approval of the Director of Civil Works.
§ 245.20 Determination of hazard to navigation.
(a) Upon receiving a report of a wreck or other obstruction, District Engineers will consult with the Coast Guard district to jointly determine whether the obstruction poses a hazard to navigation.
(b) Factors to be considered, as a minimum, include:
(1) Location of the obstruction in relation to the navigable channel and other navigational traffic patterns.
(2) Navigational difficulty in the vicinity of the obstruction.
(3) Clearance or depth of water over the obstruction, fluctuation of water level, and other hydraulic characteristics in the vicinity.
(4) Type and density of commercial and recreational vessel traffic, or other marine activity, in the vicinity of the obstruction.
(5) Physical characteristics of the obstruction, including cargo, if any.
(6) Possible movement of the obstruction.
(7) Location of the obstruction in relation to existing aids to navigation.
(8) Prevailing and historical weather conditions.
(9) Length of time the obstruction has been in existence.
(10) History of vessel accidents involving the obstruction.
§ 245.25 Determination of remedial action.
(a) Consultation with Coast Guard. After a determination has been made that an obstruction presents a hazard to navigation, District Engineers will consult with the Coast Guard district to determine appropriate remedial action for the specific situation.
(b) Options. The following options, or some combination of these options, may be considered:
(1) No action.
(2) Charting.
(3) Broadcast notice to mariners and publication of navigational safety information.
(4) Marking.
(5) Redefinition of navigational area (e.g., channel, fairway, anchorage, etc.).
(6) Removal.
§ 245.30 Identification of responsible parties.
(a) Investigation. When marking or removal are determined to be appropriate remedial action and no emergency situation exists, the District Engineer will investigate to determine the owner or, if the owner cannot be determined, the lessee or operator. If cargo is involved, ownership will be separately determined.
(b) Notification. If the owner or other responsible party can be determined, the District Engineer and/or the Coast Guard will send a notice, via certified mail, advising them of their legal obligation to mark (referencing Coast Guard requirements) and to remove the obstruction, and of the legal consequences for failure to do so, with a request for prompt reply of intent.
(c) Public notice. If the owner or responsible party cannot be determined from investigation, the District Engineer will publish a legal advertisement in a newspaper nearest the location of the obstruction and in a newspaper of at least 25,000 circulation, addressed “To Whom It May Concern,” requiring removal by the owner, lessee or operator. The advertisement will be published at least once a week for 30 days.
§ 245.35 Judgments to require removal.
When the owner or responsible party has been identified, and refuses or fails to take prompt action toward removal, the District Engineer may seek a judgment by the district court requiring removal.
§ 245.40 Removal by responsible party.
(a) Corps monitoring. If the owner, lessee or operator agrees to remove a hazard to navigation, the District Engineer should ascertain that:
(1) Marking is accomplished promptly and is maintained,
(2) The plan for removal and disposal is reasonable and acceptable to the District Engineer,
(3) Removal operations do not unreasonably interfere with navigation,
(4) All conditions of the Corps of Engineers permit are met, and
(5) Removal operations are pursued diligently.
(b) Deficiencies. If the removal actions are not proceeding satisfactorily, the District Engineer will notify the responsible party of the deficiencies and provide a reasonable time for correction. If not corrected promptly, the District Engineer may declare the wreck “abandoned” and proceed with actions toward Corps removal.
§ 245.45 Abandonment.
(a) Establishing abandonment. Abandonment is the surrendering of all rights to a vessel (or similar obstruction) and its cargo by the owner, or owners if vessel and cargo are separately owned. In all cases other than emergency, abandonment will be established as a precondition to Corps removal, to avoid a “taking” of private property for public purposes. Abandonment is established by either:
(1) Affirmative action on the part of the owner declaring intention to abandon, or
(2) Failure to commence immediate removal of the obstruction and prosecute such removal diligently.
(b) Owner declaration. The Corps of Engineers will not “accept” a notice of abandonment. Any notice of abandonment received by the Corps of Engineers will be acknowledged only, and will stand by itself as a declaration. Abandonment by the operator or lessee alone does not constitute abandonment.
(c) Non-diligence. The determination of whether removal is commenced immediately and prosecuted diligently will be made by the District Engineer based on the degree of hazard to navigation, the difficulty and complexity of the removal operation, and the appropriateness of the removal effort. When no removal actions are being undertaken and the District Engineer is unable to identify the owner through investigation or 30 days of public notice, abandonment is presumed.
(d) Cargo. If vessel and cargo are separately owned, or ownership of cargo is uncertain, abandonment of vessel and cargo will be established separately.
(e) Later claims. After abandonment is established, the owner may no longer undertake removal or make any claim upon the vessel (or other obstruction) or its cargo, unless expressly permitted by the District Engineer.
(f) Continuing owner liability. The abandonment of a wreck or other obstruction does not remove the owner's liability for the cost of removal and disposal if removal is undertaken by the Corps of Engineers, except in cases of nonnegligent sinking which occurred prior to November 17, 1986.
§ 245.50 Removal by Corps of Engineers.
(a) Non-emergency situations. In non-emergency situations, the District Engineer may undertake removal action (within the limits of delegation) after all of the following conditions have been met:
(1) A determination has been made, in consultation with the Coast Guard, that the obstruction is a hazard to navigation,
(2) The District Engineer and the Coast Guard agree on a course of action which includes the need for removal (or, if a conflict exists, the need for removal has been resolved at higher level),
(3) The District Engineer has made a reasonable attempt to identify the owner, operator, or lessee, and
(4) Abandonment of the wreck or obstruction has been established.
(b) Emergency actions. In emergency situations, the District Engineer may bypass (within the limits of delegation) any or all of the four conditions in the preceding paragraph if, in his judgment, circumstances require more immediate action, and if either one of the following conditions are met:
(1) The obstruction impedes or stops navigation, or
(2) The obstruction poses an immediate threat to life, property, or a structure that facilitates navigation.
§ 245.55 Permit requirements.
(a) Permits for removal. Marking and removal operations by the owner, operator or lessee are normally permitted under nationwide permits for such activities as outlined in part 330 of this chapter. The activities must meet certain conditions as stated in those regulations, and additional permits may still be required from state or local agencies.
(b) Special conditions. The Corps of Engineers may add individual or regional conditions to the nationwide permit, or require an individual permit on a case-by-case basis.
§ 245.60 Reimbursement for removal costs.
The Corps of Engineers will seek reimbursement from the owner, operator, or lessee, if identified, for all removal and disposal costs in excess of the value of the recovered vessel (or other obstruction) and cargo.
PART 320 GENERAL REGULATORY POLICIES
Authority: 5 U.S.C. 301; 33 U.S.C. 401 et seq.; 33 U.S.C. 1344; 33 U.S.C. 1413.
Source: 51 FR 41220, Nov. 13, 1986, unless otherwise noted.
§ 320.1 Purpose and scope.
(a) Regulatory approach of the Corps of Engineers. (1) The U.S. Army Corps of Engineers has been involved in regulating certain activities in the nation's waters since 1890. Until 1968, the primary thrust of the Corps' regulatory program was the protection of navigation. As a result of several new laws and judicial decisions, the program has evolved to one involving the consideration of the full public interest by balancing the favorable impacts against the detrimental impacts. This is known as the “public interest review.” The program is one which reflects the national concerns for both the protection and utilization of important resources.
(2) The Corps is a highly decentralized organization. Most of the authority for administering the regulatory program has been delegated to the thirty-six district engineers and eleven division engineers. A district engineer's decision on an approved jurisdictional determination, a permit denial, or a declined individual permit is subject to an administrative appeal by the affected party in accordance with the procedures and authorities contained in 33 CFR part 331. Such administrative appeal must meet the criteria in 33 CFR 331.5; otherwise, no administrative appeal of that decision is allowed. The terms “approved jurisdictional determination,” “permit denial,” and “declined permit” are defined at 33 CFR 331.2. There shall be no administrative appeal of any issued individual permit that an applicant has accepted, unless the authorized work has not started in waters of the United States, and that issued permit is subsequently modified by the district engineer pursuant to 33 CFR 325.7 (see 33 CFR 331.5(b)(1)). An affected party must exhaust any administrative appeal available pursuant to 33 CFR part 331 and receive a final Corps decision on the appealed action prior to filing a lawsuit in the Federal courts (see 33 CFR 331.12).
(3) The Corps seeks to avoid unnecessary regulatory controls. The general permit program described in 33 CFR parts 325 and 330 is the primary method of eliminating unnecessary federal control over activities which do not justify individual control or which are adequately regulated by another agency.
(4) The Corps is neither a proponent nor opponent of any permit proposal. However, the Corps believes that applicants are due a timely decision. Reducing unnecessary paperwork and delays is a continuing Corps goal.
(5) The Corps believes that state and federal regulatory programs should complement rather than duplicate one another. The Corps uses general permits, joint processing procedures, interagency review, coordination, and authority transfers (where authorized by law) to reduce duplication.
(6) The Corps has authorized its district engineers to issue formal determinations concerning the applicability of the Clean Water Act or the Rivers and Harbors Act of 1899 to activities or tracts of land and the applicability of general permits or statutory exemptions to proposed activities. A determination pursuant to this authorization shall constitute a Corps final agency action. Nothing contained in this section is intended to affect any authority EPA has under the Clean Water Act.
(b) Types of activities regulated. This part and the parts that follow (33 CFR parts 321 through 330) prescribe the statutory authorities, and general and special policies and procedures applicable to the review of applications for Department of the Army (DA) permits for controlling certain activities in waters of the United States or the oceans. This part identifies the various federal statutes which require that DA permits be issued before these activities can be lawfully undertaken; and related Federal laws and the general policies applicable to the review of those activities. Parts 321 through 324 and 330 address special policies and procedures applicable to the following specific classes of activities:
(1) Dams or dikes in navigable waters of the United States (part 321);
(2) Other structures or work including excavation, dredging, and/or disposal activities, in navigable waters of the United States (part 322);
(3) Activities that alter or modify the course, condition, location, or capacity of a navigable water of the United States (part 322);
(4) Construction of artificial islands, installations, and other devices on the outer continental shelf (part 322);
(5) Discharges of dredged or fill material into waters of the United States (part 323);
(6) Activities involving the transportation of dredged material for the purpose of disposal in ocean waters (part 324); and
(7) Nationwide general permits for certain categories of activities (part 330).
(c) Forms of authorization. DA permits for the above described activities are issued under various forms of authorization. These include individual permits that are issued following a review of individual applications and general permits that authorize a category or categories of activities in specific geographical regions or nationwide. The term “general permit” as used in these regulations (33 CFR parts 320 through 330) refers to both those regional permits issued by district or division engineers on a regional basis and to nationwide permits which are issued by the Chief of Engineers through publication in the Federal Register and are applicable throughout the nation. The nationwide permits are found in 33 CFR part 330. If an activity is covered by a general permit, an application for a DA permit does not have to be made. In such cases, a person must only comply with the conditions contained in the general permit to satisfy requirements of law for a DA permit. In certain cases pre-notification may be required before initiating construction. (See 33 CFR 330.7)
(d) General instructions. General policies for evaluating permit applications are found in this part. Special policies that relate to particular activities are found in parts 321 through 324. The procedures for processing individual permits and general permits are contained in 33 CFR part 325. The terms “navigable waters of the United States” and “waters of the United States” are used frequently throughout these regulations, and it is important from the outset that the reader understand the difference between the two. “Navigable waters of the United States” are defined in 33 CFR part 329. These are waters that are navigable in the traditional sense where permits are required for certain work or structures pursuant to Sections 9 and 10 of the Rivers and Harbors Act of 1899. “Waters of the United States” are defined in 33 CFR part 328. These waters include more than navigable waters of the United States and are the waters where permits are required for the discharge of dredged or fill material pursuant to section 404 of the Clean Water Act.
[51 FR 41220, Nov. 13, 1986, as amended at 64 FR 11714, Mar. 9, 1999; 65 FR 16492, Mar. 28, 2000]
§ 320.2 Authorities to issue permits.
(a) Section 9 of the Rivers and Harbors Act, approved March 3, 1899 (33 U.S.C. 401) (hereinafter referred to as section 9), prohibits the construction of any dam or dike across any navigable water of the United States in the absence of Congressional consent and approval of the plans by the Chief of Engineers and the Secretary of the Army. Where the navigable portions of the waterbody lie wholly within the limits of a single state, the structure may be built under authority of the legislature of that state if the location and plans or any modification thereof are approved by the Chief of Engineers and by the Secretary of the Army. The instrument of authorization is designated a permit (See 33 CFR part 321.) Section 9 also pertains to bridges and causeways but the authority of the Secretary of the Army and Chief of Engineers with respect to bridges and causeways was transferred to the Secretary of Transportation under the Department of Transportation Act of October 15, 1966 (49 U.S.C. 1155g(6)(A)). A DA permit pursuant to section 404 of the Clean Water Act is required for the discharge of dredged or fill material into waters of the United States associated with bridges and causeways. (See 33 CFR part 323.)
(b) Section 10 of the Rivers and Harbors Act approved March 3, 1899, (33 U.S.C. 403) (hereinafter referred to as section 10), prohibits the unauthorized obstruction or alteration of any navigable water of the United States. The construction of any structure in or over any navigable water of the United States, the excavating from or depositing of material in such waters, or the accomplishment of any other work affecting the course, location, condition, or capacity of such waters is unlawful unless the work has been recommended by the Chief of Engineers and authorized by the Secretary of the Army. The instrument of authorization is designated a permit. The authority of the Secretary of the Army to prevent obstructions to navigation in navigable waters of the United States was extended to artificial islands, installations, and other devices located on the seabed, to the seaward limit of the outer continental shelf, by section 4(f) of the Outer Continental Shelf Lands Act of 1953 as amended (43 U.S.C. 1333(e)). (See 33 CFR part 322.)
(c) Section 11 of the Rivers and Harbors Act approved March 3, 1899, (33 U.S.C. 404), authorizes the Secretary of the Army to establish harbor lines channelward of which no piers, wharves, bulkheads, or other works may be extended or deposits made without approval of the Secretary of the Army. Effective May 27, 1970, permits for work shoreward of those lines must be obtained in accordance with section 10 and, if applicable, section 404 of the Clean Water Act (see § 320.4(o) of this part).
(d) Section 13 of the Rivers and Harbors Act approved March 3, 1899, (33 U.S.C. 407), provides that the Secretary of the Army, whenever the Chief of Engineers determines that anchorage and navigation will not be injured thereby, may permit the discharge of refuse into navigable waters. In the absence of a permit, such discharge of refuse is prohibited. While the prohibition of this section, known as the Refuse Act, is still in effect, the permit authority of the Secretary of the Army has been superseded by the permit authority provided the Administrator, Environmental Protection Agency (EPA), and the states under sections 402 and 405 of the Clean Water Act, (33 U.S.C. 1342 and 1345). (See 40 CFR parts 124 and 125.)
(e) Section 14 of the Rivers and Harbors Act approved March 3, 1899, (33 U.S.C. 408), provides that the Secretary of the Army, on the recommendation of the Chief of Engineers, may grant permission for the temporary occupation or use of any sea wall, bulkhead, jetty, dike, levee, wharf, pier, or other work built by the United States. This permission will be granted by an appropriate real estate instrument in accordance with existing real estate regulations.
(f) Section 404 of the Clean Water Act (33 U.S.C. 1344) (hereinafter referred to as section 404) authorizes the Secretary of the Army, acting through the Chief of Engineers, to issue permits, after notice and opportunity for public hearing, for the discharge of dredged or fill material into the waters of the United States at specified disposal sites. (See 33 CFR part 323.) The selection and use of disposal sites will be in accordance with guidelines developed by the Administrator of EPA in conjunction with the Secretary of the Army and published in 40 CFR part 230. If these guidelines prohibit the selection or use of a disposal site, the Chief of Engineers shall consider the economic impact on navigation and anchorage of such a prohibition in reaching his decision. Furthermore, the Administrator can deny, prohibit, restrict or withdraw the use of any defined area as a disposal site whenever he determines, after notice and opportunity for public hearing and after consultation with the Secretary of the Army, that the discharge of such materials into such areas will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas, wildlife, or recreational areas. (See 40 CFR part 230).
(g) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended (33 U.S.C. 1413) (hereinafter referred to as section 103), authorizes the Secretary of the Army, acting through the Chief of Engineers, to issue permits, after notice and opportunity for public hearing, for the transportation of dredged material for the purpose of disposal in the ocean where it is determined that the disposal will not unreasonably degrade or endanger human health, welfare, or amenities, or the marine environment, ecological systems, or economic potentialities. The selection of disposal sites will be in accordance with criteria developed by the Administrator of the EPA in consultation with the Secretary of the Army and published in 40 CFR parts 220 through 229. However, similar to the EPA Administrator's limiting authority cited in paragraph (f) of this section, the Administrator can prevent the issuance of a permit under this authority if he finds that the disposal of the material will result in an unacceptable adverse impact on municipal water supplies, shellfish beds, wildlife, fisheries, or recreational areas. (See 33 CFR part 324).
§ 320.3 Related laws.
(a) Section 401 of the Clean Water Act (33 U.S.C. 1341) requires any applicant for a federal license or permit to conduct any activity that may result in a discharge of a pollutant into waters of the United States to obtain a certification from the State in which the discharge originates or would originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the affected waters at the point where the discharge originates or would originate, that the discharge will comply with the applicable effluent limitations and water quality standards. A certification obtained for the construction of any facility must also pertain to the subsequent operation of the facility.
(b) Section 307(c) of the Coastal Zone Management Act of 1972, as amended (16 U.S.C. 1456(c)), requires federal agencies conducting activities, including development projects, directly affecting a state's coastal zone, to comply to the maximum extent practicable with an approved state coastal zone management program. Indian tribes doing work on federal lands will be treated as a federal agency for the purpose of the Coastal Zone Management Act. The Act also requires any non-federal applicant for a federal license or permit to conduct an activity affecting land or water uses in the state's coastal zone to furnish a certification that the proposed activity will comply with the state's coastal zone management program. Generally, no permit will be issued until the state has concurred with the non-federal applicant's certification. This provision becomes effective upon approval by the Secretary of Commerce of the state's coastal zone management program. (See 15 CFR part 930.)
(c) Section 302 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended (16 U.S.C. 1432), authorizes the Secretary of Commerce, after consultation with other interested federal agencies and with the approval of the President, to designate as marine sanctuaries those areas of the ocean waters, of the Great Lakes and their connecting waters, or of other coastal waters which he determines necessary for the purpose of preserving or restoring such areas for their conservation, recreational, ecological, or aesthetic values. After designating such an area, the Secretary of Commerce shall issue regulations to control any activities within the area. Activities in the sanctuary authorized under other authorities are valid only if the Secretary of Commerce certifies that the activities are consistent with the purposes of Title III of the Act and can be carried out within the regulations for the sanctuary.
(d) The National Environmental Policy Act of 1969 (42 U.S.C. 4321-4347) declares the national policy to encourage a productive and enjoyable harmony between man and his environment. Section 102 of that Act directs that “to the fullest extent possible: (1) The policies, regulations, and public laws of the United States shall be interpreted and administered in accordance with the policies set forth in this Act, and
(2) All agencies of the Federal Government shall * * * insure that presently unquantified environmental amenities and values may be given appropriate consideration in decisionmaking along with economic and technical considerations * * *”. (See 33 CFR part 333.)
(e) The Fish and Wildlife Act of 1956 (16 U.S.C. 742a, et seq.), the Migratory Marine Game-Fish Act (16 U.S.C. 760c-760g), the Fish and Wildlife Coordination Act (16 U.S.C. 661-666c) and other acts express the will of Congress to protect the quality of the aquatic environment as it affects the conservation, improvement and enjoyment of fish and wildlife resources. Reorganization Plan No. 4 of 1970 transferred certain functions, including certain fish and wildlife-water resources coordination responsibilities, from the Secretary of the Interior to the Secretary of Commerce. Under the Fish and Wildlife Coordination Act and Reorganization Plan No. 4, any federal agency that proposes to control or modify any body of water must first consult with the United States Fish and Wildlife Service or the National Marine Fisheries Service, as appropriate, and with the head of the appropriate state agency exercising administration over the wildlife resources of the affected state.
(f) The Federal Power Act of 1920 (16 U.S.C. 791a et seq.), as amended, authorizes the Federal Energy Regulatory Agency (FERC) to issue licenses for the construction and the operation and maintenance of dams, water conduits, reservoirs, power houses, transmission lines, and other physical structures of a hydro-power project. However, where such structures will affect the navigable capacity of any navigable water of the United States (as defined in 16 U.S.C. 796), the plans for the dam or other physical structures affecting navigation must be approved by the Chief of Engineers and the Secretary of the Army. In such cases, the interests of navigation should normally be protected by a DA recommendation to FERC for the inclusion of appropriate provisions in the FERC license rather than the issuance of a separate DA permit under 33 U.S.C. 401 et seq. As to any other activities in navigable waters not constituting construction and the operation and maintenance of physical structures licensed by FERC under the Federal Power Act of 1920, as amended, the provisions of 33 U.S.C. 401 et seq. remain fully applicable. In all cases involving the discharge of dredged or fill material into waters of the United States or the transportation of dredged material for the purpose of disposal in ocean waters, section 404 or section 103 will be applicable.
(g) The National Historic Preservation Act of 1966 (16 U.S.C. 470) created the Advisory Council on Historic Preservation to advise the President and Congress on matters involving historic preservation. In performing its function the Council is authorized to review and comment upon activities licensed by the Federal Government which will have an effect upon properties listed in the National Register of Historic Places, or eligible for such listing. The concern of Congress for the preservation of significant historical sites is also expressed in the Preservation of Historical and Archeological Data Act of 1974 (16 U.S.C. 469 et seq.), which amends the Act of June 27, 1960. By this Act, whenever a federal construction project or federally licensed project, activity, or program alters any terrain such that significant historical or archeological data is threatened, the Secretary of the Interior may take action necessary to recover and preserve the data prior to the commencement of the project.
(h) The Interstate Land Sales Full Disclosure Act (15 U.S.C. 1701 et seq.) prohibits any developer or agent from selling or leasing any lot in a subdivision (as defined in 15 U.S.C. 1701(3)) unless the purchaser is furnished in advance a printed property report containing information which the Secretary of Housing and Urban Development may, by rules or regulations, require for the protection of purchasers. In the event the lot in question is part of a project that requires DA authorization, the property report is required by Housing and Urban Development regulation to state whether or not a permit for the development has been applied for, issued, or denied by the Corps of Engineers under section 10 or section 404. The property report is also required to state whether or not any enforcement action has been taken as a consequence of non-application for or denial of such permit.
(i) The Endangered Species Act (16 U.S.C. 1531 et seq.) declares the intention of the Congress to conserve threatened and endangered species and the ecosystems on which those species depend. The Act requires that federal agencies, in consultation with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service, use their authorities in furtherance of its purposes by carrying out programs for the conservation of endangered or threatened species, and by taking such action necessary to insure that any action authorized, funded, or carried out by the Agency is not likely to jeopardize the continued existence of such endangered or threatened species or result in the destruction or adverse modification of habitat of such species which is determined by the Secretary of the Interior or Commerce, as appropriate, to be critical. (See 50 CFR part 17 and 50 CFR part 402.)
(j) The Deepwater Port Act of 1974 (33 U.S.C. 1501 et seq.) prohibits the ownership, construction, or operation of a deepwater port beyond the territorial seas without a license issued by the Secretary of Transportation. The Secretary of Transportation may issue such a license to an applicant if he determines, among other things, that the construction and operation of the deepwater port is in the national interest and consistent with national security and other national policy goals and objectives. An application for a deepwater port license constitutes an application for all federal authorizations required for the ownership, construction, and operation of a deepwater port, including applications for section 10, section 404 and section 103 permits which may also be required pursuant to the authorities listed in § 320.2 and the policies specified in § 320.4 of this part.
(k) The Marine Mammal Protection Act of 1972 (16 U.S.C. 1361 et seq.) expresses the intent of Congress that marine mammals be protected and encouraged to develop in order to maintain the health and stability of the marine ecosystem. The Act imposes a perpetual moratorium on the harassment, hunting, capturing, or killing of marine mammals and on the importation of marine mammals and marine mammal products without a permit from either the Secretary of the Interior or the Secretary of Commerce, depending upon the species of marine mammal involved. Such permits may be issued only for purposes of scientific research and for public display if the purpose is consistent with the policies of the Act. The appropriate Secretary is also empowered in certain restricted circumstances to waive the requirements of the Act.
(l) Section 7(a) of the Wild and Scenic Rivers Act (16 U.S.C. 1278 et seq.) provides that no department or agency of the United States shall assist by loan, grant, license, or otherwise in the construction of any water resources project that would have a direct and adverse effect on the values for which such river was established, as determined by the Secretary charged with its administration.
(m) The Ocean Thermal Energy Conversion Act of 1980, (42 U.S.C. section 9101 et seq.) establishes a licensing regime administered by the Administrator of NOAA for the ownership, construction, location, and operation of ocean thermal energy conversion (OTEC) facilities and plantships. An application for an OTEC license filed with the Administrator constitutes an application for all federal authorizations required for ownership, construction, location, and operation of an OTEC facility or plantship, except for certain activities within the jurisdiction of the Coast Guard. This includes applications for section 10, section 404, section 103 and other DA authorizations which may be required.
(n) Section 402 of the Clean Water Act authorizes EPA to issue permits under procedures established to implement the National Pollutant Discharge Elimination System (NPDES) program. The administration of this program can be, and in most cases has been, delegated to individual states. Section 402(b)(6) states that no NPDES permit will be issued if the Chief of Engineers, acting for the Secretary of the Army and after consulting with the U.S. Coast Guard, determines that navigation and anchorage in any navigable water will be substantially impaired as a result of a proposed activity.
(o) The National Fishing Enhancement Act of 1984 (Pub. L. 98-623) provides for the development of a National Artificial Reef Plan to promote and facilitate responsible and effective efforts to establish artificial reefs. The Act establishes procedures to be followed by the Corps in issuing DA permits for artificial reefs. The Act also establishes the liability of the permittee and the United States. The Act further creates a civil penalty for violation of any provision of a permit issued for an artificial reef.
[51 FR 41220, Nov. 13, 1986, as amended at 90 FR 29471, July 3, 2025]
§ 320.4 General policies for evaluating permit applications.
The following policies shall be applicable to the review of all applications for DA permits. Additional policies specifically applicable to certain types of activities are identified in 33 CFR parts 321 through 324.
(a) Public interest review. (1) The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity and its intended use on the public interest. Evaluation of the probable impact which the proposed activity may have on the public interest requires a careful weighing of all those factors which become relevant in each particular case. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The decision whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur, are therefore determined by the outcome of this general balancing process. That decision should reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal must be considered including the cumulative effects thereof: among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b)(1) guidelines. Subject to the preceding sentence and any other applicable guidelines and criteria (see §§ 320.2 and 320.3), a permit will be granted unless the district engineer determines that it would be contrary to the public interest.
(2) The following general criteria will be considered in the evaluation of every application:
(i) The relative extent of the public and private need for the proposed structure or work:
(ii) Where there are unresolved conflicts as to resource use, the practicability of using reasonable alternative locations and methods to accomplish the objective of the proposed structure or work; and
(iii) The extent and permanence of the beneficial and/or detrimental effects which the proposed structure or work is likely to have on the public and private uses to which the area is suited.
(3) The specific weight of each factor is determined by its importance and relevance to the particular proposal. Accordingly, how important a factor is and how much consideration it deserves will vary with each proposal. A specific factor may be given great weight on one proposal, while it may not be present or as important on another. However, full consideration and appropriate weight will be given to all comments, including those of federal, state, and local agencies, and other experts on matters within their expertise.
(b) Effect on wetlands. (1) Most wetlands constitute a productive and valuable public resource, the unnecessary alteration or destruction of which should be discouraged as contrary to the public interest. For projects to be undertaken or partially or entirely funded by a federal, state, or local agency, additional requirements on wetlands considerations are stated in Executive Order 11990, dated 24 May 1977.
(2) Wetlands considered to perform functions important to the public interest include:
(i) Wetlands which serve significant natural biological functions, including food chain production, general habitat and nesting, spawning, rearing and resting sites for aquatic or land species;
(ii) Wetlands set aside for study of the aquatic environment or as sanctuaries or refuges;
(iii) Wetlands the destruction or alteration of which would affect detrimentally natural drainage characteristics, sedimentation patterns, salinity distribution, flushing characteristics, current patterns, or other environmental characteristics;
(iv) Wetlands which are significant in shielding other areas from wave action, erosion, or storm damage. Such wetlands are often associated with barrier beaches, islands, reefs and bars;
(v) Wetlands which serve as valuable storage areas for storm and flood waters;
(vi) Wetlands which are ground water discharge areas that maintain minimum baseflows important to aquatic resources and those which are prime natural recharge areas;
(vii) Wetlands which serve significant water purification functions; and
(viii) Wetlands which are unique in nature or scarce in quantity to the region or local area.
(3) Although a particular alteration of a wetland may constitute a minor change, the cumulative effect of numerous piecemeal changes can result in a major impairment of wetland resources. Thus, the particular wetland site for which an application is made will be evaluated with the recognition that it may be part of a complete and interrelated wetland area. In addition, the district engineer may undertake, where appropriate, reviews of particular wetland areas in consultation with the Regional Director of the U. S. Fish and Wildlife Service, the Regional Director of the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration, the Regional Administrator of the Environmental Protection Agency, the local representative of the Soil Conservation Service of the Department of Agriculture, and the head of the appropriate state agency to assess the cumulative effect of activities in such areas.
(4) No permit will be granted which involves the alteration of wetlands identified as important by paragraph (b)(2) of this section or because of provisions of paragraph (b)(3), of this section unless the district engineer concludes, on the basis of the analysis required in paragraph (a) of this section, that the benefits of the proposed alteration outweigh the damage to the wetlands resource. In evaluating whether a particular discharge activity should be permitted, the district engineer shall apply the section 404(b)(1) guidelines (40 CFR part 230.10(a) (1), (2), (3)).
(5) In addition to the policies expressed in this subpart, the Congressional policy expressed in the Estuary Protection Act, Pub. L. 90-454, and state regulatory laws or programs for classification and protection of wetlands will be considered.
(c) Fish and wildlife. In accordance with the Fish and Wildlife Coordination Act (paragraph 320.3(e) of this section) district engineers will consult with the Regional Director, U.S. Fish and Wildlife Service, the Regional Director, National Marine Fisheries Service, and the head of the agency responsible for fish and wildlife for the state in which work is to be performed, with a view to the conservation of wildlife resources by prevention of their direct and indirect loss and damage due to the activity proposed in a permit application. The Army will give full consideration to the views of those agencies on fish and wildlife matters in deciding on the issuance, denial, or conditioning of individual or general permits.
(d) Water quality. Applications for permits for activities which may adversely affect the quality of waters of the United States will be evaluated for compliance with applicable effluent limitations and water quality standards, during the construction and subsequent operation of the proposed activity. The evaluation should include the consideration of both point and non-point sources of pollution. It should be noted, however, that the Clean Water Act assigns responsibility for control of non-point sources of pollution to the states. Certification of compliance with applicable effluent limitations and water quality standards required under provisions of section 401 of the Clean Water Act will be considered conclusive with respect to water quality considerations unless the Regional Administrator, Environmental Protection Agency (EPA), advises of other water quality aspects to be taken into consideration.
(e) Historic, cultural, scenic, and recreational values. Applications for DA permits may involve areas which possess recognized historic, cultural, scenic, conservation, recreational or similar values. Full evaluation of the general public interest requires that due consideration be given to the effect which the proposed structure or activity may have on values such as those associated with wild and scenic rivers, historic properties and National Landmarks, National Rivers, National Wilderness Areas, National Seashores, National Recreation Areas, National Lakeshores, National Parks, National Monuments, estuarine and marine sanctuaries, archeological resources, including Indian religious or cultural sites, and such other areas as may be established under federal or state law for similar and related purposes. Recognition of those values is often reflected by state, regional, or local land use classifications, or by similar federal controls or policies. Action on permit applications should, insofar as possible, be consistent with, and avoid significant adverse effects on the values or purposes for which those classifications, controls, or policies were established.
(f) Effects on limits of the territorial sea. Structures or work affecting coastal waters may modify the coast line or base line from which the territorial sea is measured for purposes of the Submerged Lands Act and international law. Generally, the coast line or base line is the line of ordinary low water on the mainland; however, there are exceptions where there are islands or lowtide elevations offshore (the Submerged Lands Act, 43 U.S.C. 1301(a) and United States v. California, 381 U.S.C. 139 (1965), 382 U.S. 448 (1966)). Applications for structures or work affecting coastal waters will therefore be reviewed specifically to determine whether the coast line or base line might be altered. If it is determined that such a change might occur, coordination with the Attorney General and the Solicitor of the Department of the Interior is required before final action is taken. The district engineer will submit a description of the proposed work and a copy of the plans to the Solicitor, Department of the Interior, Washington, DC 20240, and request his comments concerning the effects of the proposed work on the outer continental rights of the United States. These comments will be included in the administrative record of the application. After completion of standard processing procedures, the record will be forwarded to the Chief of Engineers. The decision on the application will be made by the Secretary of the Army after coordination with the Attorney General.
(g) Consideration of property ownership. Authorization of work or structures by DA does not convey a property right, nor authorize any injury to property or invasion of other rights.
(1) An inherent aspect of property ownership is a right to reasonable private use. However, this right is subject to the rights and interests of the public in the navigable and other waters of the United States, including the federal navigation servitude and federal regulation for environmental protection.
(2) Because a landowner has the general right to protect property from erosion, applications to erect protective structures will usually receive favorable consideration. However, if the protective structure may cause damage to the property of others, adversely affect public health and safety, adversely impact floodplain or wetland values, or otherwise appears contrary to the public interest, the district engineer will so advise the applicant and inform him of possible alternative methods of protecting his property. Such advice will be given in terms of general guidance only so as not to compete with private engineering firms nor require undue use of government resources.
(3) A riparian landowner's general right of access to navigable waters of the United States is subject to the similar rights of access held by nearby riparian landowners and to the general public's right of navigation on the water surface. In the case of proposals which create undue interference with access to, or use of, navigable waters, the authorization will generally be denied.
(4) Where it is found that the work for which a permit is desired is in navigable waters of the United States (see 33 CFR part 329) and may interfere with an authorized federal project, the applicant should be apprised in writing of the fact and of the possibility that a federal project which may be constructed in the vicinity of the proposed work might necessitate its removal or reconstruction. The applicant should also be informed that the United States will in no case be liable for any damage or injury to the structures or work authorized by Sections 9 or 10 of the Rivers and Harbors Act of 1899 or by section 404 of the Clean Water Act which may be caused by, or result from, future operations undertaken by the Government for the conservation or improvement of navigation or for other purposes, and no claims or right to compensation will accrue from any such damage.
(5) Proposed activities in the area of a federal project which exists or is under construction will be evaluated to insure that they are compatible with the purposes of the project.
(6) A DA permit does not convey any property rights, either in real estate or material, or any exclusive privileges. Furthermore, a DA permit does not authorize any injury to property or invasion of rights or any infringement of Federal, state or local laws or regulations. The applicant's signature on an application is an affirmation that the applicant possesses or will possess the requisite property interest to undertake the activity proposed in the application. The district engineer will not enter into disputes but will remind the applicant of the above. The dispute over property ownership will not be a factor in the Corps public interest decision.
(h) Activities affecting coastal zones. Applications for DA permits for activities affecting the coastal zones of those states having a coastal zone management program approved by the Secretary of Commerce will be evaluated with respect to compliance with that program. No permit will be issued to a non-federal applicant until certification has been provided that the proposed activity complies with the coastal zone management program and the appropriate state agency has concurred with the certification or has waived its right to do so. However, a permit may be issued to a non-federal applicant if the Secretary of Commerce, on his own initiative or upon appeal by the applicant, finds that the proposed activity is consistent with the objectives of the Coastal Zone Management Act of 1972 or is otherwise necessary in the interest of national security. Federal agency and Indian tribe applicants for DA permits are responsible for complying with the Coastal Zone Management Act's directives for assuring that their activities directly affecting the coastal zone are consistent, to the maximum extent practicable, with approved state coastal zone management programs.
(i) Activities in marine sanctuaries. Applications for DA authorization for activities in a marine sanctuary established by the Secretary of Commerce under authority of section 302 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended, will be evaluated for impact on the marine sanctuary. No permit will be issued until the applicant provides a certification from the Secretary of Commerce that the proposed activity is consistent with the purposes of Title III of the Marine Protection, Research and Sanctuaries Act of 1972, as amended, and can be carried out within the regulations promulgated by the Secretary of Commerce to control activities within the marine sanctuary.
(j) Other Federal, state, or local requirements. (1) Processing of an application for a DA permit normally will proceed concurrently with the processing of other required Federal, state, and/or local authorizations or certifications. Final action on the DA permit will normally not be delayed pending action by another Federal, state or local agency (See 33 CFR 325.2 (d)(4)). However, where the required Federal, state and/or local authorization and/or certification has been denied for activities which also require a Department of the Army permit before final action has been taken on the Army permit application, the district engineer will, after considering the likelihood of subsequent approval of the other authorization and/or certification and the time and effort remaining to complete processing the Army permit application, either immediately deny the Army permit without prejudice or continue processing the application to a conclusion. If the district engineer continues processing the application, he will conclude by either denying the permit as contrary to the public interest, or denying it without prejudice indicating that except for the other Federal, state or local denial the Army permit could, under appropriate conditions, be issued. Denial without prejudice means that there is no prejudice to the right of the applicant to reinstate processing of the Army permit application if subsequent approval is received from the appropriate Federal, state and/or local agency on a previously denied authorization and/or certification. Even if official certification and/or authorization is not required by state or federal law, but a state, regional, or local agency having jurisdiction or interest over the particular activity comments on the application, due consideration shall be given to those official views as a reflection of local factors of the public interest.
(2) The primary responsibility for determining zoning and land use matters rests with state, local and tribal governments. The district engineer will normally accept decisions by such governments on those matters unless there are significant issues of overriding national importance. Such issues would include but are not necessarily limited to national security, navigation, national economic development, water quality, preservation of special aquatic areas, including wetlands, with significant interstate importance, and national energy needs. Whether a factor has overriding importance will depend on the degree of impact in an individual case.
(3) A proposed activity may result in conflicting comments from several agencies within the same state. Where a state has not designated a single responsible coordinating agency, district engineers will ask the Governor to express his views or to designate one state agency to represent the official state position in the particular case.
(4) In the absence of overriding national factors of the public interest that may be revealed during the evaluation of the permit application, a permit will generally be issued following receipt of a favorable state determination provided the concerns, policies, goals, and requirements as expressed in 33 CFR parts 320-324, and the applicable statutes have been considered and followed: e.g., the National Environmental Policy Act; the Fish and Wildlife Coordination Act; the Historical and Archeological Preservation Act; the National Historic Preservation Act; the Endangered Species Act; the Coastal Zone Management Act; the Marine Protection, Research and Sanctuaries Act of 1972, as amended; the Clean Water Act, the Archeological Resources Act, and the American Indian Religious Freedom Act. Similarly, a permit will generally be issued for Federal and Federally-authorized activities; another federal agency's determination to proceed is entitled to substantial consideration in the Corps' public interest review.
(5) Where general permits to avoid duplication are not practical, district engineers shall develop joint procedures with those local, state, and other Federal agencies having ongoing permit programs for activities also regulated by the Department of the Army. In such cases, applications for DA permits may be processed jointly with the state or other federal applications to an independent conclusion and decision by the district engineer and the appropriate Federal or state agency. (See 33 CFR 325.2(e).)
(6) The district engineer shall develop operating procedures for establishing official communications with Indian Tribes within the district. The procedures shall provide for appointment of a tribal representative who will receive all pertinent public notices, and respond to such notices with the official tribal position on the proposed activity. This procedure shall apply only to those tribes which accept this option. Any adopted operating procedures shall be distributed by public notice to inform the tribes of this option.
(k) Safety of impoundment structures. To insure that all impoundment structures are designed for safety, non-Federal applicants may be required to demonstrate that the structures comply with established state dam safety criteria or have been designed by qualified persons and, in appropriate cases, that the design has been independently reviewed (and modified as the review would indicate) by similarly qualified persons.
(l) Floodplain management. (1) Floodplains possess significant natural values and carry out numerous functions important to the public interest. These include:
(i) Water resources values (natural moderation of floods, water quality maintenance, and groundwater recharge);
(ii) Living resource values (fish, wildlife, and plant resources);
(iii) Cultural resource values (open space, natural beauty, scientific study, outdoor education, and recreation); and
(iv) Cultivated resource values (agriculture, aquaculture, and forestry).
(2) Although a particular alteration to a floodplain may constitute a minor change, the cumulative impact of such changes may result in a significant degradation of floodplain values and functions and in increased potential for harm to upstream and downstream activities. In accordance with the requirements of Executive Order 11988, district engineers, as part of their public interest review, should avoid to the extent practicable, long and short term significant adverse impacts associated with the occupancy and modification of floodplains, as well as the direct and indirect support of floodplain development whenever there is a practicable alternative. For those activities which in the public interest must occur in or impact upon floodplains, the district engineer shall ensure, to the maximum extent practicable, that the impacts of potential flooding on human health, safety, and welfare are minimized, the risks of flood losses are minimized, and, whenever practicable the natural and beneficial values served by floodplains are restored and preserved.
(3) In accordance with Executive Order 11988, the district engineer should avoid authorizing floodplain developments whenever practicable alternatives exist outside the floodplain. If there are no such practicable alternatives, the district engineer shall consider, as a means of mitigation, alternatives within the floodplain which will lessen any significant adverse impact to the floodplain.
(m) Water supply and conservation. Water is an essential resource, basic to human survival, economic growth, and the natural environment. Water conservation requires the efficient use of water resources in all actions which involve the significant use of water or that significantly affect the availability of water for alternative uses including opportunities to reduce demand and improve efficiency in order to minimize new supply requirements. Actions affecting water quantities are subject to Congressional policy as stated in section 101(g) of the Clean Water Act which provides that the authority of states to allocate water quantities shall not be superseded, abrogated, or otherwise impaired.
(n) Energy conservation and development. Energy conservation and development are major national objectives. District engineers will give high priority to the processing of permit actions involving energy projects.
(o) Navigation. (1) Section 11 of the Rivers and Harbors Act of 1899 authorized establishment of harbor lines shoreward of which no individual permits were required. Because harbor lines were established on the basis of navigation impacts only, the Corps of Engineers published a regulation on 27 May 1970 (33 CFR 209.150) which declared that permits would thereafter be required for activities shoreward of the harbor lines. Review of applications would be based on a full public interest evaluation and harbor lines would serve as guidance for assessing navigation impacts. Accordingly, activities constructed shoreward of harbor lines prior to 27 May 1970 do not require specific authorization.
(2) The policy of considering harbor lines as guidance for assessing impacts on navigation continues.
(3) Protection of navigation in all navigable waters of the United States continues to be a primary concern of the federal government.
(4) District engineers should protect navigational and anchorage interests in connection with the NPDES program by recommending to EPA or to the state, if the program has been delegated, that a permit be denied unless appropriate conditions can be included to avoid any substantial impairment of navigation and anchorage.
(p) Environmental benefits. Some activities that require Department of the Army permits result in beneficial effects to the quality of the environment. The district engineer will weigh these benefits as well as environmental detriments along with other factors of the public interest.
(q) Economics. When private enterprise makes application for a permit, it will generally be assumed that appropriate economic evaluations have been completed, the proposal is economically viable, and is needed in the market place. However, the district engineer in appropriate cases, may make an independent review of the need for the project from the perspective of the overall public interest. The economic benefits of many projects are important to the local community and contribute to needed improvements in the local economic base, affecting such factors as employment, tax revenues, community cohesion, community services, and property values. Many projects also contribute to the National Economic Development (NED), (i.e., the increase in the net value of the national output of goods and services).
(r) Mitigation. 1 (1) Mitigation is an important aspect of the review and balancing process on many Department of the Army permit applications. Consideration of mitigation will occur throughout the permit application review process and includes avoiding, minimizing, rectifying, reducing, or compensating for resource losses. Losses will be avoided to the extent practicable. Compensation may occur on-site or at an off-site location. Mitigation requirements generally fall into three categories.
1 This is a general statement of mitigation policy which applies to all Corps of Engineers regulatory authorities covered by these regulations (33 CFR parts 320-330). It is not a substitute for the mitigation requirements necessary to ensure that a permit action under section 404 of the Clean Water Act complies with the section 404(b)(1) Guidelines. There is currently an interagency Working Group formed to develop guidance on implementing mitigation requirements of the Guidelines.
(i) Project modifications to minimize adverse project impacts should be discussed with the applicant at pre-application meetings and during application processing. As a result of these discussions and as the district engineer's evaluation proceeds, the district engineer may require minor project modifications. Minor project modifications are those that are considered feasible (cost, constructability, etc.) to the applicant and that, if adopted, will result in a project that generally meets the applicant's purpose and need. Such modifications can include reductions in scope and size; changes in construction methods, materials or timing; and operation and maintenance practices or other similar modifications that reflect a sensitivity to environmental quality within the context of the work proposed. For example, erosion control features could be required on a fill project to reduce sedimentation impacts or a pier could be reoriented to minimize navigational problems even though those projects may satisfy all legal requirements (paragraph (r)(1)(ii) of this section) and the public interest review test (paragraph (r)(1)(iii) of this section) without such modifications.
(ii) Further mitigation measures may be required to satisfy legal requirements. For Section 404 applications, mitigation shall be required to ensure that the project complies with the 404(b)(1) Guidelines. Some mitigation measures are enumerated at 40 CFR 230.70 through 40 CFR 230.77 (Subpart H of the 404(b)(1) Guidelines).
(iii) Mitigation measures in addition to those under paragraphs (r)(1) (i) and (ii) of this section may be required as a result of the public interest review process. (See 33 CFR 325.4(a).) Mitigation should be developed and incorporated within the public interest review process to the extent that the mitigation is found by the district engineer to be reasonable and justified. Only those measures required to ensure that the project is not contrary to the public interest may be required under this subparagraph.
(2) All compensatory mitigation will be for significant resource losses which are specifically identifiable, reasonably likely to occur, and of importance to the human or aquatic environment. Also, all mitigation will be directly related to the impacts of the proposal, appropriate to the scope and degree of those impacts, and reasonably enforceable. District engineers will require all forms of mitigation, including compensatory mitigation, only as provided in paragraphs (r)(1) (i) through (iii) of this section. Additional mitigation may be added at the applicants' request.