Title 10—Energy--Volume 5

CHAPTER II DEPARTMENT OF ENERGY (CONTINUED)

SUBCHAPTER E ALTERNATE FUELS

PART 500 DEFINITIONS

Authority: Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. § 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3289 (42 U.S.C. 8301 et seq.); Energy Security Act, Pub. L.96-294, 94 Stat. 611 (42 U.S.C. 8701 et seq.); E.O. 1209, 42 FR 46267, September 15, 1977.

Source: 46 FR 59884, Dec. 7, 1981, unless otherwise noted.

§ 500.1 Purpose and scope.

Unless otherwise expressly provided or the context clearly indicates otherwise, this section defines the terms used in these regulations. The use of the male gender is to include female; the use of singular to include plural.

§ 500.2 General definitions.

For purposes of this part and parts 501-507 term(s):

Act means Powerplant and Industrial Fuel Use Act of 1978, 42 U.S.C. 8301 et seq.

Action means a prohibition by rule or order, in accordance with sections 301(b) and (c) of FUA; any order granting or denying an exemption in accordance with sections 211, 212, 311 and 312 of FUA; a modification or rescission of any such order, or rule; an interpretation; a notice of violation; a remedial order; an interpretive ruling; or a rulemaking undertaken by DOE.

Affiliate, when used in relation to person, means another person who controls, is controlled by, or is under common control, with such person.

Aggrieved, for purposes of administrative proceedings, describes and means a person (with an interest sought to be protected under FUA) who is adversely affected by an action proposed or undertaken by DOE.

Air pollution control agency means any of the following:

(1) A single State agency designated as the official State air pollution control agency;

(2) An agency established by two or more States and having substantial powers or duties pertaining to the prevention and control of air pollution;

(3) A city, county, or other local government health authority or, in the case of any city, county, or other local unit of government in which there is an agency other than the health authority charged with responsibility for enforcing ordinances or laws relating to the prevention and control of air pollution, such other agency; or

(4) An agency or two or more municipalities located in the same State or in different States and having substantial powers or duties pertaining to the prevention and control of air pollution.

Alternate fuel means electricity or any fuel, other than natural gas or petroleum. The term includes, but is not limited to :

(1) Coal;

(2) Solar energy;

(3) Petroleum coke; shale oil; uranium; biomass, tar sands, oil-impregnated diatomaceous earth; municipal, industrial, or agricultural wastes; wood; and renewable and geothermal energy sources (For purposes of this paragraph (3), the term industrial does not include refineries.);

(4) Liquid, solid or gaseous waste by-products of refinery or industrial operations which are commercially unmarketable, either by reason of quality or quantity. (For purposes of this paragraph (4), the term waste by-product is defined as an unavoidable by-product of the industrial or refinery operation.) A waste by-product of a refinery or industrial operation is commercially unmarketable if it meets the criteria listed in the definition of “commercial unmarketability,” set forth below;

(5) Any fuel derived from an alternate fuel; and

(6) Waste gases from industrial operations. (For purposes of this subsection, the term industrial does not include refineries.)

Applicable environmental requirements includes:

(1) Any standard, limitation, or other requirement established by or pursuant to Federal or State law (including any final order of any Federal or State Court) applicable to emissions of environmental pollutants (including air and water pollutants) or disposal of solid waste residues resulting from the use of coal or other alternate fuels, natural gas, or petroleum as a primary energy source or from the operation of pollution control equipment in connection with such use, taking into account any variance of law granted or issued in accordance with Federal law or in accordance with State law to the extent consistent with Federal law; and

(2) Any other standard, limitation, or other requirement established by, or pursuant to, the Clean Air Act, the Federal Water Pollution Control Act, the Solid Waste Disposal Act, the Resource Conservation and Recovery Act of 1976, or the National Environmental Policy Act of 1969.

Base load powerplant means a powerplant, the electrical generation of which in kilowatt hours exceeds, for any 12-calendar-month period, such powerplant's design capacity multiplied by 3,500 hours.

Boiler means a closed vessel in which water is heated electrically or by the combustion of a fuel to produce steam of one percent or more quality.

Btu means British thermal unit.

Capability to use alternate fuel, for the purposes of Title II prohibitions relating to construction of new powerplants, means the powerplant to be constructed:

(1) Has sufficient inherent design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or another alternate fuel as its primary energy source; and

(2) Is not physically, structurally, or technologically precluded from using coal or another alternate fuel as its primary energy source.

Capability to use coal or another alternate fuel shall not be interpreted to require any such powerplant to be immediately able to use coal or another alternate fuel as its primary energy source on its initial day of operation. In addition, the owner or operator of a baseload powerplant need not have adequate on-site space for either a coal gasifier or any facilities for handling coal or related fuels.

Certification means a document, signed by an official of the owner or operator, notarized, and submitted to OFE, which declares that a new powerplant will have the “capability to use alternate fuel” (as defined herein).

Certifying powerplant means an existing powerplant whose owner or operator seeks to obtain a prohibition order against the use of natural gas or petroleum either totally or in a mixture with coal or an alternate fuel by filing a certification as to both the technical capability and financial feasibility of conversion to coal or another alternate fuel pursuant to section 301 of FUA, as amended.

Clean Air Act means the Clean Air Act, 42 U.S.C. 7401 et seq. (1970), as amended by Public Law 93-319, 88 Stat. 246, and Public Law 95-91, 91 Stat. 685.

Coal means anthracite, bituminous and sub-bituminous coal, lignite, and any fuel derivative thereof.

Cogeneration facility means an electric powerplant that produces:

(1) Electric power; and

(2) Any other form of useful energy (such as steam, gas or heat) that is, or will be used, for industrial, commercial, or space heating purposes. In addition, for purposes of this definition, electricity generated by the cogeneration facility must constitute more than five (5) percent and less than ninety (90) percent of the useful energy output of the facility.

Note:

Any cogeneration facility selling or exchanging less than fifty percent (50%) of the facility's generated electricity is considered an industrial cogenerator and is exempt from the fuel use prohibitions of FUA.

Combined cycle unit means an electric power generating unit that consists of a combination of one or more combustion turbine units and one or more steam turbine units with a substantial portion of the required energy input of the steam turbine unit(s) provided by the exhaust gas from the combustion turbine unit(s).

Substantial amounts of supplemental firing for a steam turbine or waste heat boiler to improve thermal efficiency will not affect a unit's classification as a combined cycle unit.

Combustion turbine means a unit that is a rotary engine driven by a gas under pressure that is created by the combustion of any fuel.

Commercial unmarketability as used in the definitions of “alternate fuel,” “natural gas” and “petroleum” shall be determined as follows:

(1) A waste by-product of industrial or refinery operations is commercially unmarketable by reason of:

(i) Quality, where the cost of processing (limited to upgrading the waste by-product to commercial quality), storing, and distributing the waste by-product would not be covered by reasonably expected revenues from its sale;

(ii) Quantity, where the cost of aggregating the waste by-product into commercial quantities through storing and distributing the waste by-product would not be covered by reasonably expected revenues from its sale.

(2) A fuel will not be classified as “natural gas” when it is commercially unmarketable by reason of:

(i) Quality, where the cost of producing, upgrading to commercial quality, storing, and distributing the fuel would not be covered by reasonably expected revenues from its sale; or

(ii) Quantity, where the quantities of the fuel are so small that the revenues to be reasonably expected from its sale would not cover the cost of its production, distribution or storage.

(3) Costs associated with upgrading, storing, distributing, and aggregating a by-product or other fuel (to determine if such fuel is natural gas) may properly include a reasonable rate of return on any capital investment required to overcome the problems posed by the quality or quantity of a fuel because the return on investment is a normal aspect of any investment decision. A firm may account for this reasonable rate of return by using its customary discount rate for an investment of similar risk.

(4) As part of any consideration of the rate of return on investment, the cost of replacing the Btu's lost if the by-product or other fuel were upgraded and sold instead of used as a fuel may be taken into consideration. The actual expense that would result from burning a replacement fuel in lieu of the by-product or other fuel in question may therefore be considered. The costs associated with using a replacement fuel are indirect costs that result from upgrading and selling the fuel, instead of burning it. These indirect costs as well as the direct costs associated with the upgrading, storing, distributing, and aggregating of by-products or other fuel may be considered in any assessment of commercial unmarketability.

Conference means an informal meeting incident to any proceeding, between DOE and any interested person.

Construction means substantial physical activity at the unit site and includes more than clearance of a site or installation of foundation pilings.

Costs means total costs, both operating and capital, incurred over the estimated remaining useful life of an electric powerplant, discounted to the present, pursuant to rules established in parts 503 and 504 of these regulations.

DEOA means the Department of Energy Organization Act (Pub. L. 95-91) (42 U.S.C. 7101 et seq.) as implemented by Executive Order 12009 (42 FR 46267, September 15, 1977).

Design capability defined in section 103(a)(7) of FUA, shall be determined as follows:

(1) Boiler and associated generator turbines. The design fuel heat input rate of a steam-electric generating unit (Btu/hr) shall be the product of the generator's nameplate rating, measured in kilowatts, and 3412 (Btu/kWh), divided by the overall boiler-turbine-generator unit design efficiency (decimal); or if the generator's nameplate does not have a rating measured in kilowatts, the product of the generator's kilovolt-amperes nameplate rating, and the power factor nameplate rating; and 3412 (Btu/kWh), divided by the boiler turbine-generator unit's design efficiency (decimal). (The number 3412 converts kilowatt-hours (absolute) into Btu's (mean).)

(2) Combustion turbine and associated generator. The design fuel heat input rate of a combustion turbine (Btu/hr) shall be the product of its nameplate rating, measured in kilowatts, and 3412 (Btu/kWh), divided by the combustion turbine-generator unit's design efficiency (decimal), adjusted for peaking service at an ambient temperature of 59 degrees Fahrenheit (15 degrees Celsius) at the unit's elevation. (The number 3412 converts kilowatt-hours (absolute) into Btu's (mean).)

(3) Combined cycle unit. The design fuel heat input rate of a combined cycle unit (Btu/hr) shall be the summation of the product of its generator's nameplate rating, measured in kilowatts, and 3412 (Btu/kWh), divided by the overall combustion turbine-generator unit's efficiency (decimal), adjusted for peaking service at an ambient temperature of 59 degrees Fahrenheit (15 degrees Celsius) and at the unit's evaluation, plus the product of the maximum fuel heat input to any supplemental heat recovery steam generator/boiler in gallons or pounds per hour and the fuel's heat content. If the generator's nameplate does not have a rating measured in kilowatts, the product of the generator's kilowatt-amperes nameplate rating and power factor nameplate rating must be substituted for kilowatts. (The number 3412 converts kilowatt-hours (absolute) into Btu's (mean).)

Design capacity of a powerplant pursuant to section 103(a)(18) of FUA, is determined according to 18 CFR 287.101.

DOE or the Department means the United States Department of Energy, as defined in sections 201 and 301(a) of the DEOA, including the Secretary of Energy or his designee.

Duly authorized representative means a person who is authorized to appear before DOE in connection with a proceeding on behalf of a person interested in or aggrieved by that proceeding. Such appearance may include the submission of applications, petitions, requests, statements, memoranda of law, other documents, or of a personal appearance, oral communication, or any other participation in a proceeding.

Electing powerplant means an existing powerplant, which (1) has been issued a proposed prohibition order under former section 301 (b) or (c) of FUA prior to August 13, 1981, the date of enactment of the Omnibus Budget Reconciliation Act of 1981, Public Law 97-35 (OBRA); and (2) files an election to continue the current prohibition order proceeding under provisions of the former section 301 of FUA, rather than under amended section 301 of FUA. 1 Under the election provisions, an existing powerplant which has an order pending against it under section 2 of the Energy Supply and Environmental Coordination Act of 1974, as amended, 15 U.S.C. 791 et seq. (ESECA), as of August 13, 1981, may also elect to continue the current proceeding under section 2 of ESECA. Electing powerplants under ESECA are not included in the FUA definition of “electing powerplant”. Relevant regulations governing ESECA proceedings are found at 10 CFR part 303 and 305. These elections must have been filed with DOE by November 30, 1981 in the case of FUA orders and by January 14, 1982 in the case of ESECA orders.

1 The election provisions are published at 46 FR 48118 (October 1, 1981) and will not be codified in the Code of Federal Regulations.

Electric generating unit does not include:

(1) Any electric generating unit subject to the licensing jurisdiction of the Nuclear Regulatory Commission (NRC); and

(2) Any cogeneration facility from which less than 50 percent of the net annual electric power generation is sold or exchanged for resale. Excluded from ‘sold or exchanged for resale’ are sales or exchanges to or with an electric utility for resale by the utility to the cogenerating supplier, and sales or exchanges among owners of the cogeneration facility.

Note:

For purposes of subparagraph (1) of this definition, OFE will not consider any unit located at a site subject to NRC's licensing authority to be jurisdictional for purposes of FUA.

Electric powerplant means any stationary electric generating unit consisting of (a) a boiler, (b) a gas turbine, or (c) a combined cycle unit which employs a generator to produce electric power for purposes of sale or exchange and has the design capabilityf consuming any fuel (or mixture thereof) at a fuel heat input rate of 100 million Btu's per hour or greater. In accordance with section 103(a)(7)(C) of FUA, the Secretary has determined that it is appropriate to exclude from this definition any unit which has a design capability to consume any fuel (including any mixture thereof) that does not equal or exceed 100 million Btu's per hour.

Electric Region is as defined in § 500.3 of this part.

Electric utility means any person, including any affiliate, or Federal agency, which sells electric power.

Emission offset means emission reductions as defined by EPA's regulations set forth at 40 CFR part 51, appendix S.

EPA means the United States Environmental Protection Agency.

ESECA means the Energy Supply and Environmental Coordination Act of 1974, as amended, 15 U.S.C. 791 et seq.

Existing powerplant means any powerplant other than a new powerplant.

Federal Water Pollution Control Act means the Federal Water Pollution Control Act, 33 U.S.C. 1251 et seq., as amended.

FERC means the Federal Energy Regulatory Commission.

Firm means a parent company and the consolidated or unconsolidated entities (if any) that it directly or indirectly controls.

Fluidized bed combustion means combustion of fuel in connection with a bed of inert material, such as limestone or dolomite, that is held in a fluid-like state by the means of air or other gases being passed through such materials.

FTC means the Federal Trade Commission.

FUA means the Powerplant and Industrial Fuel Use Act of 1978, 42 U.S.C. 8301 et seq.

Fuel Use Act means FUA.

Fuel use order means a directive issued by OFE pursuant to § 501.167 of these regulations.

Gas turbine means “combustion turbine”.

High-priority user, for purposes of subsection 312(j) of FUA, means any residential user of natural gas, or any commercial user whose consumption of natural gas on peak day is less than 50 MCF.

Internal combustion engine means a heat engine in which the combustion that generates the heat takes place inside the engine proper.

Interpretation means a written statement issued by the DOE General Counsel or his delegate, in response to a written request, that applies the regulations, rulings, and other precedents previously issued by the DOE to the particular facts of a prospective or completed act or transaction.

Mcf means 1,000 cubic feet of natural gas.

Mixture, when used in relation to fuels used in a unit, means a mixture of petroleum or natural gas and an alternate fuel, or a combination of such fuels, used simultaneously or alternately in such unit.

Natural gas means any fuel consisting in whole or in part of natural gas, including components of natural gas such as methane and ethane; liquid petroleum gas; synthetic gas derived from petroleum or natural gas liquids; or any mixture of natural gas and synthetic gas. Natural gas does not include:

(1) Gaseous waste by-products or waste gas specifically designated as an alternate fuel in § 500.2 of these regulations;

(2) Natural gas which is commercially unmarketable, as defined in these rules;

(3) Natural gas produced by the user from a well, the maximum efficient production rate of which is less than 250 million Btu's per day. For purposes of paragraph (3) of this definition:

(i) Produced by the user means:

(A) All gas produced by the well, when such gas is delivered for use in the user's facility through a gas delivery, gathering, or transportation system which could not deliver such gas to any other user; or

(B) Only that amount which represents the user's net working (mineral) interest in the gas produced from such well, where such gas is delivered for use in the user's facility through a gas delivery, gathering, or transportation system which could deliver such gas to any other user.

(ii) Maximum efficient production rate (MEPR) means that rate at which production of natural gas may be sustained without damage to the reservoir or the rate which may be sustained without damage to the ultimate recovery of oil or gas through the well.

(4) Occluded methane in coal seams within the meaning of section 107(c)(3) of the Natural Gas Policy Act of 1978 (NGPA);

(5) The following gas from wells spudded prior to January 1, 1990:

(i) Gas produced from geopressurized brine, within the meaning of section 107(c)(2) of the NGPA;

(ii) Gas produced from Devonian shale, within the meaning of section 107(c)(4) of the NGPA;

(iii) Gas produced from tight sands, as designated by the FERC in accordance with section 107(c)(5) of the NGPA; and

(iv) Other gases designated by FERC as “high-cost natural gas” in accordance with section 107(c)(5) of the NGPA, except as specifically designated as “natural gas” by OFE;

(6)(i) Synthetic gas derived from coal or other alternate fuel, the heat content of which is less than 600 Btu's per cubic foot at 14.73 pounds per square inch (absolute) and 60 °F; and

(ii) Commingled natural gas and synthetic gas derived from coal consumed as part of the necessary process of a major fuel burning installation used in the iron and steel industry, so long as the average annual Btu heat content of the commingled stream as consumed within a major fuel burning installation does not exceed 600 Btu's per cubic foot at 14.73 pounds per square inch (absolute) and 60 °F;

(7) Mixtures of natural gas and synthetic gas derived from alternate fuels for which the person proposing to use the gas certifies to OFE that:

(i) He owns, or is entitled to receive at the point of manufacture, synthetic gas derived from alternate fuels;

(ii) He delivers, or arranges for the delivery of such synthetic gas to a pipeline which by transport or displacement is capable of delivering such synthetic gas, mixed with natural gas, to facilities owned by the user;

(iii) The total annual Btu content of the synthetic gas delivered to a pipeline is equal to or greater than the total annual Btu content of the natural gas delivered to the facilities owned by the user, plus the approximate total annual Btu content of any natural gas consumed or lost in transportation; and

(iv) All necessary permits, licenses, or approvals from appropriate Federal, State, and local agencies (including Indian tribes) have been obtained for construction and operation of the facilities for the manufacture of the synthetic gas involved, except that for purposes of the prohibition under section 201(2) of FUA against powerplants being constructed without the capability of using coal or another alternate fuel, only permits, licenses, and approvals for the construction of such synthetic gas facilities shall be required under this subparagraph, to be certified and documented; and

(8) A mixture of natural gas and an alternate fuel when such mixture is deliberately created for purposes of (i) Complying with a prohibition order issued pursuant to section 301(c) of the Act, or (ii) Qualifying for a fuel mixtures exemption under the Act, provided such exemption is granted.

NEPA means the National Environmental Policy Act of 1969, as amended, 42 U.S.C. 4321 et seq.

New electric powerplant means any electric powerplant: (1) That was not classified as existing under part 515 of this subchapter; (2) That was reconstructed, as defined in these rules under the definition of “reconstruction”; or (3) For which construction was begun after November 9, 1978.

NGPA means the Natural Gas Policy Act of 1978, 15 U.S.C. 3301 et seq.

Nonboiler means any powerplant which is not a boiler and consists of either a combustion turbine unit or combined cycle unit.

Notice of violation means a written statement issued to a person by DOE that states one or more alleged violations of the provisions of these regulations, any order issued pursuant thereto, or the Act.

OBRA means the Omnibus Budget Reconciliation Act of 1981, Public Law 97-35.

OFE means the Office of Fossil Energy of OFE.

Offset means “emission offset”.

Order means a final disposition, other than the issuance of a rule, issued by DOE pursuant to these regulations or the Act.

Person means any:

(1) Individual, corporation, company, partnership, association, firm, institution, society, trust, joint venture, or joint stock company;

(2) Any State; or

(3) Any Federal, State, or local agency or instrumentality (including any municipality) thereof.

Petroleum means crude oil and products derived from crude oil, other than:

(1) Petroleum products specifically designated as alternate fuels pursuant to these regulations;

(2) Synthetic gas derived from crude oil;

(3) Liquid petroleum gas;

(4) Petroleum coke or waste gases from industrial operations; and

(5) A liquid, solid, or gaseous waste by-product of refinery operations which is commercially unmarketable under the definition of “commercial unmarketability” in these rules.

Note:

For the purposes of this subparagraph, waste by-products do not include components (such as butane and propane) that can be extracted from the waste by-product by reasonable further processing of the waste by-product at the refinery, nor do they include final products that use the waste by-product as a blend stock at the refinery.

Petition means a formal request for any action including an exemption submitted to DOE under these regulations.

Powerplant means “electric powerplant.”

Product or process requirements means that product or process for which the use of an alternate fuel is not technically feasible due to the necessity to maintain satisfactory control of product quality and for which the substitution of steam is not technically feasible due to process requirements.

Primary energy source means the fuel or fuels used by any existing or new electric powerplant except:

(1) Minimum amounts of fuel required for unit ignition, startup, testing, flame stabilization, and control uses. OFE has determined that, unless need for a greater amount is demonstrated, twenty-five (25) percent of the total annual Btu heat input of a unit shall be automatically excluded under this paragraph.

(2) Minimum amounts of fuel required to alleviate or prevent:

(i) Unanticipated equipment outages as defined in § 501.191 of these regulations; and

(ii) Emergencies directly affecting the public health, safety, or welfare that would result from electric power outages as defined in § 501.191 of these regulations.

Note:

(1) Any fuel excluded under the provisions of paragraph (1) of this definition is in addition to any fuel authorized to be used in any order granting a fuel mixtures exemption under parts 503 and 504 of these rules. The exclusion of fuel under paragraph (1), together with the authority for such additive treatment, shall apply to any jurisdictional facility, regardless of whether or not it had received an order granting an exemption as of the date these rules are promulgated.

(2) If an auxiliary unit to an electric powerplant consumes fuel only for the auxiliary functions of unit ignition, startup, testing, flame stabilization, and other control uses, its use of minimum amounts of natural gas or petroleum is not prohibited by FUA. The measurement of such minimum amounts of fuel is discussed in Associated Electric Cooperative, et al., Interpretation 1980-42 [45 FR 82572, Dec. 15, 1980].

Prohibition order means:

(1) An order issued pursuant to section 301(b) of the Act that prohibits a powerplant from burning natural gas or petroleum as its primary energy source; or

(2) An order issued pursuant to section 301(c) of the Act that prohibits excessive use of natural gas or petroleum in mixtures burned by a powerplant as its primary energy source.

Rated capacity for the purpose of determining reduction in the rated capacity of an existing powerplant, means design capacity, or, at the election of the facility owner or operator, the actual maximum sustained energy output per unit of time that could be produced, measured in power output, expressed in kilowatts, per unit of time.

Reconstruction means the following:

(1) Except as provided in paragraph (2) of this definition, reconstruction shall be found to have taken place whenever the capital expenditures for refurbishment or modification of an electric powerplant on a cumulative basis for the current calendar year and preceding calendar year, are equal to or greater than fifty (50) percent of the capital costs of an equivalent replacement unit of the same capacity, capable of burning the same fuels.

(2) Notwithstanding paragraph (1) of this definition, reconstruction shall not be found to have taken place whenever:

(i) The capital expenditures for refurbishment or modification of an electric powerplant, on a cumulative basis for the current calendar year and preceding calendar year, are not greater than eighty (80) percent of the capital costs of an equivalent replacement unit of the same capacity, capable of burning the same fuels and the unit, as refurbished or modified, will not have a greater fuel consumption capability than the unit it replaces;

(ii) The unit being refurbished or modified was destroyed, in whole or substantial part, in a plant accident and the unit, as refurbished or modified, will not have a greater fuel consumption capability than the unit it replaces; or

(iii) Refurbishment or modification of the unit is undertaken primarily for the purpose of increasing fuel burning efficiency of the unit, and will not result in:

(A) Increased remaining useful plant life, or

(B) Increased total annual fuel consumption.

Resource Conservation and Recovery Act of 1976 means the Resource Conservation and Recovery Act of 1976, 42 U.S.C. 6901 et seq.

SIP means State Implementation Plan pursuant to section 10 of the Clean Air Act.

Site limitation means a specific physical limitation associated with a particular site that relates to the use of an alternate fuel as a primary energy source for the powerplant such as:

(1) Inaccessibility to alternate fuels;

(2) Lack of transportation facilities for alternate fuels;

(3) Lack of adequate land for facilities for the handling, use and storage of alternate fuels;

(4) Lack of adequate land or facilities for the control or disposal of wastes from such powerplant, including lack of land for pollution control equipment or devices necessary to assure compliance with applicable environmental requirements; and

(5) Lack of an adequate and reliable supply of water, including water for use in compliance with applicable environmental requirements.

Solid Waste Disposal Act means the Solid Waste Disposal Act, 42 U.S.C. 6901 et seq., as amended.

State regulatory authority means any State agency that acts as ratemaking or power supply authority with respect to the sale of electricity by any State regulated electric utility.

Synthetic fuel means any fuel derived from an alternate fuel and does not include any fuels derived from petroleum or natural gas.

Wetlands areas means, for purposes of section 103(a)(12) of the Act, those geographical areas designated as wetlands areas by State or local environmental regulatory authorities, or in the absence of any such geographic designation, those areas that are inundated by surface or ground water with frequency sufficient to support, and under normal circumstances does or would support, a prevalence of vegetation or aquatic life that requires saturated, seasonably saturated, or tidally saturated soil conditions for growth or reproduction.

(Department of Energy Organization Act, Pub. L. 95-91, 42 U.S.C. 7101 et seq.; Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620, (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35)

[46 FR 59884, Dec. 7, 1981, as amended at 47 FR 15313, 15314, Apr. 9, 1982; 47 FR 17041, Apr. 21, 1982; 47 FR 29210, July 6, 1982; 47 FR 34972, Aug. 12, 1982; 54 FR 52889, Dec. 22, 1989]

§ 500.3 Electric regions—electric region groupings for reliability measurements under the Powerplant and Industrial Fuel Use Act of 1978.

(a) The following is a list of electric regions for use with regard to the Act. The regions are identified by FERC Power Supply Areas (PSA's) as authorized by section 202(a) of the Federal Power Act except where noted. They will be reviewed annually by ERA. Each grouping meets one or more of the following criteria:

(1) Existing centrally dispatched pools and hourly power brokers;

(2) Systems with joint planning and construction agreements;

(3) Systems with coordination agreements in the areas of:

(i) Generation reserve and system reliability criteria;

(ii) Capacity and energy exchange policies;

(iii) Maintenance scheduling; and

(iv) Emergency procedures for dealing with capacity or fuel shortages; or

(4) Systems within the same National Electric Reliability Council (NERC) region with historical coordination policies.

(b) The PSA's referred to in the definition of electric regions in paragraph (a) of this section were first defined by the Federal Power Commission in 1936. The most recent reference to them is given in the 1970 National Power Survey, Vol. 1, Pg. 1-3-16. In cases where a petitioner finds an ambiguity in a regional assignment, he shall consult with DOE for an official determination.

Electric Region Groupings and FERC PSA's:

1. Allegheny Power System (APS)—7, except Duquesne Light Company.

2. American Electric Power System (AEP)—entire AEP System.

3. New England Planning Pool (NEPOOL)—1, 2.

4. New York Planning Pool (NYPP)—3, 4.

5. Pennsylvania—New Jersey—Maryland interconnection (PJM)—5, 6.

6. Commonwealth Edison Company—14.

7. Florida Coordination Group (FCG)—24.

8. Middle South Utilities—25.

9. Southern Company—22, 23.

10. Gulf States Group—35.

11. Tennessee Valley Authority (TVA)—20.

12. Virginia—Carolina Group (VACAR)—18, 21.

13. Central Area Power Coordination Group (CAPCO)—Cleveland Electric Illuminating Company, Toledo Edison Company, Ohio Edison Company, Duquesne Light Company.

14. Cincinnati, Columbus, Dayton Group (CCD)—Cincinnati Gas and Electric Company, Columbus and Southern Ohio Electric Company, Dayton Power and Light Company.

15. Kentucky Group—19.

16. Indiana Group—Indiana Utilities except AEP.

17. Illinois—Missouri Group (ILLMO)—15, 40.

18. Michigan Electric Coordinated Systems (MECS)—11.

19. Wisconsin—Upper Michigan Group (WUMS)—13.

20. Mid-Continent Area Power Pool (MAAP)—16, 17, 26, 27, 28.

21. Missouri—Kansas Group (MOKAN)—24, 29.

22. Oklahoma Group—33, 36.

23. Texas Interconnected Systems (TIS)—37, 38.

24. Rocky Mountain Power Pool (RMPP)—31, 32.

25. Northwest Power Pool (NWPP)—30, 42, 43, 44, 45.

26. Arizona—New Mexico Group—39, 48 within Arizona. in Nevada and California.

27. Southern California—Nevada—47, 48.

28. Northern California—Nevada—46.

29. Alaska (non-interconnected systems to be considered separately)—49.

30. Idaho—Utah Group—41.

PART 501 ADMINISTRATIVE PROCEDURES AND SANCTIONS

Authority: 42 U.S.C. 7101 et seq.; 42 U.S.C. 8301 et seq.; 42 U.S.C. 8701 et seq.; E.O. 12009, 42 FR 46267; 28 U.S.C. 2461 note.

Source: 46 FR 59889, Dec. 7, 1981, unless otherwise noted.

Subpart A General Provisions
§ 501.1 Purpose and scope.

Part 501 establishes the procedures to be used in proceedings before DOE under parts 500-508 of this chapter except as otherwise provided.

§ 501.2 Prepetition conference.

(a) Owners and operators of powerplants may request a prepetition conference with OFE for the purpose of discussing the applicability of 10 CFR parts 503 and 504 to their situations and the scope of any exemption or other petition that OFE would accept as adequate for filing purposes.

(b) The owner or operator who requests a prepetition conference may personally represent himself or may designate a representative to appear on his behalf. A prepetition conference or a request for a prepetition conference does not commence a proceeding before OFE.

(c) If OFE agrees to waive any filing requirements under § 501.3(d), a memorandum of record stating this fact will be furnished to the potential petitioner within thirty (30) days after the conference. Copies of all applicable memoranda of record must be attached to any subsequently-filed petition.

(d) A record of all prepetition conferences will be included in the public file. OFE may provide for the taking of a formal transcript of the conference and the transcript will be included in the public file.

[46 FR 59889, Dec. 7, 1981, as amended at 54 FR 52891, Dec. 22, 1989]

§ 501.3 Petitions.

(a) Filing of petitions. Petitions for exemptions are to be filed with OFE at the address given in § 501.11.

(b) Acceptance of petition. (1) Upon acceptance (as distinguished from filing) of the petition, OFE shall publish in the Federal Register a Notice of Acceptance of Petition or, in the case of an exemption by certification, a Notice of Acceptance and Availability of Certification, signifying that an exemption proceeding has commenced.

(2) OFE will notify each petitioner in writing within thirty (30) days of receipt of the petition that it has been accepted or rejected and, if rejected, the reasons therefor.

(3) A petition, including supporting documents, will be accepted if the information contained appears to be sufficient to support an OFE determination. Additional information may be requested during the course of the proceeding, and failure to respond to such a request may ultimately result in denial of the requested exemption.

(4) Acceptance of petition does not constitute a determination that the requested exemption will be granted.

(c) Rejection of petition. (1) OFE will reject a petition if it does not meet the information of certification requirements established for the relevant exemptions under parts 503 and 504 of this chapter. A written explanation of the reasons for rejection will be furnished with notification of the rejection.

(2) A timely-filed petition rejected as inadequate will not be rendered untimely if resubmitted in amended form within ninety (90) days of the date of rejection.

(3) OFE will, within thirty (30) days of receipt of a petition that is found to be incomplete due to minor deficiencies, notify the petitioner of the deficiencies and allow ninety (90) days from the date of notification to cure the specified deficiencies. The failure to cure the deficiencies during this time may result in denial of the requested exemption.

(d) Waiver of filing requirements. Upon its own motion or at the request of a petitioner, OFE may waive some or all of the regulatory requirements if the purposes of FUA would be best achieved by doing so.

§§ 501.4-501.5 [Reserved]
§ 501.6 Service.

(a) DOE will serve all orders, notices interpretations or other documents that it is required to serve, personally or by mail, unless otherwise provided in these regulations.

(b) DOE will consider service upon a petitioner's duly authorized representative to be service upon the petitioner.

(c) Service by mail is effective upon mailing.

[54 FR 52891, Dec. 22, 1989]

§ 501.7 General filing requirements.

Except as indicated otherwise, all documents required or permitted to be filed with OFE or DOE in connection with a proceeding under parts 503 and 504 shall be filed in accordance with the following provisions:

(a) Filing of documents. (1) Documents including, but not limited to, applications, requests, complaints, petitions (including petitions for exemption), and other documents submitted in connection therewith, filed with OFE are considered to be filed upon receipt.

(2) Notwithstanding the provisions of paragraph (a)(1) of this section, an application for modification or rescission in accordance with subpart G of this part, a reply to a notice of violation, a response to a denial of a claim of confidentiality, or a comment submitted in connection with any proceeding transmitted by registered or certified mail and addressed to the appropriate office is considered to be filed upon mailing.

(3) Timeliness. Documents are to be filed with the appropriate DOE or OFE office listed in § 501.11. Documents that are to be considered filed upon receipt under paragraph (a)(1) of this section and that are received after regular business hours are deemed filed on the next regular business day. Regular business hours are 8 a.m. to 4:30 p.m.

(4) Computation of time. In computing any period of time prescribed or allowed by FUA, these regulations or by an order, the day of the act, event, or default from which the designated period of time begins to run is not to be included. The last day of the period so computed is to be included unless it is a Saturday, Sunday, or Federal legal holiday in which event the period runs until the end of the next day that is neither a Saturday, Sunday, nor a Federal legal holiday.

(5) Additional time after service by mail. Whenever a person is required to perform an act, to cease and desist therefrom, or to initiate a proceeding under this part within a prescribed period of time and the order, notice, interpretation or other document is served by mail, three (3) days shall be added to the prescribed period.

(6) Extension of time. When a document is required to be filed within a prescribed time, an extension of time to file may be granted upon good cause shown.

(7) Signing. All applications, petitions, requests, comments, and other documents that are required to be signed, shall be signed by the person filing the document or a duly authorized representative. Any application, petition, request, complaint, or other document filed by a duly authorized representative shall contain a statement by such person certifying that he is a duly authorized representative, unless an OFE form otherwise requires. (A false certification is unlawful under the provisions of 18 U.S.C. 1001 (1970).)

(8) Labeling. An application, petition, or other request for action by DOE or OFE should be clearly labeled according to the nature of the action involved, e.g., “Petition for Temporary Exemption;” “Petition for Extension (or Renewal) of Temporary Exemption,” both on the document and on the outside of the envelope in which the document is transmitted.

(9) Obligation to supply information. A person who files an application, petition, complaint, or other request for action is under a continuing obligation during the proceeding to provide DOE or OFE with any new or newly discovered information that is relevant to that proceeding. Such information includes, but is not limited to, information regarding any other application, petition, complaint, or request for action that is subsequently filed by that person with any DOE office or OFE office.

(10) The same or related matters. In filing a petition or other document requesting OFE action, the person must state whether, to the best of his knowledge, the same or a related issue, act or transaction has been or presently is being considered or investigated by a DOE office, other Federal agency, department or instrumentality, or a State or municipal agency.

(11) Request for confidential treatment. (i) If any person filing a document with DOE or OFE claims that some or all of the information contained in the document is exempt from the mandatory public disclosure requirements of the Freedom of Information Act (5 U.S.C. 552); is information referred to in 18 U.S.C. 1905; or is otherwise exempt by law from public disclosure, and if such person requests DOE or OFE not to disclose such information, such person shall make a filing in accordance with paragraph (b)(2) of this section. The person shall indicate in the original document that it is confidential or contains confidential information and may file a statement specifying the justification for non-disclosure of the information for which confidential treatment is claimed. If the person states that the information comes within the exception in 5 U.S.C. 552(b)(4) for trade secrets and commercial or financial information, such person shall include a statement specifying why such information is privileged or confidential. If a document is not so filed, OFE may assume that there is no objection to public disclosure of the document in its entirety, unless the person subsequently files a claim of confidentiality prior to public disclosure of the document.

(ii) DOE or OFE retains the right to make its own determination with regard to any claim of confidentiality. Notice of the decision by DOE or OFE to deny such claim, in whole or in part, and an opportunity to respond or take other appropriate action to avoid release shall be given to a person claiming confidentiality of information no less than seven (7) days prior to its public disclosure.

(iii) The above provisions in paragraphs (a)(11) (i) and (ii) of this section do not apply to information submitted on OFE forms that contain their own instructions concerning the treatment of confidential information.

(12) Separate applications, petitions or requests. Each application, petition, or request for DOE or OFE action shall be submitted as a separate document, even if the applications, petitions, or requests deal with the same or a related issue, act, or transaction, or are submitted in connection with the same proceeding.

(b) Number of documents to be filed. (1) A petitioner must file an executed original and fourteen (14) copies of all exemption requests submitted to DOE. For certification requests, an original and three (3) copies shall be submitted.

(2) Where the petitioner requests confidential treatment of some or all of the information submitted, an original and eleven (11) copies of the confidential document and three (3) copies of the document with confidential material deleted must be filed.

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 15314, Apr. 9, 1982; 54 FR 52891, Dec. 22, 1989]

§ 501.8 [Reserved]
§ 501.9 Effective date of orders or rules.

(a) When OFE issues a rule or order imposing a prohibition or granting an exemption (or permit) under FUA, the rule or order will be effective sixty (60) days after publication in the Federal Register, unless it is stayed, modified, suspended or rescinded.

(b) If the appropriate State regulatory authority has not approved a powerplant for which a petition has been filed, such exemption, to the extent it applies to the prohibition under section 201 of FUA against construction without the capability of using coal or another alternate fuel, shall not take effect until all approvals required by such State regulatory authority which relate to construction have been obtained.

[54 FR 52891, Dec. 22, 1989]

§ 501.10 Order of precedence.

If there is any conflict or inconsistency between the provisions of this part and any other provisions or parts of this chapter, except for general procedures which are unique to part 515 of this chapter, the provisions of this part will control respect to procedure.

[54 FR 52891, Dec. 22, 1989]

§ 501.11 Address for filing documents.

Send all petitions, self-certifications and written communications to the following address: Office of Fossil Energy, Office of Fuels Programs, Coal and Electricity Division, Mail Code FE-52, 1000 Independence Avenue, SW., Washington, DC 20585.

[54 FR 52891, Dec. 22, 1989]

§ 501.12 Public files.

DOE will make available at the Freedom of Information reading room, room 1E190, 1000 Independence Avenue SW., Washington, DC for public inspection and copying any information required by statute and any information that OFE determines should be made available to the public.

[54 FR 52891, Dec. 22, 1989]

§ 501.13 Appeal.

There is no administrative appeal of any final administrative action to which this part applies.

§ 501.14 Notice to Environmental Protection Agency.

A copy of any proposed rule or order that imposes a prohibition, order that imposes a prohibition, or a petition for an exemption or permit, shall be transmitted for comments, if any, to the Administrator and the appropriate Regional Administrator of the Environmental Protection Agency (EPA). The Administrator of EPA shall be given the same opportunity to comment and question as is given other interested persons.

[54 FR 52891, Dec. 22, 1989]

B Subpart B [Reserved]
Subpart C Written Comments, Public Hearings and Conferences During Administrative Proceedings
§ 501.30 Purpose and scope.

This subpart establishes the procedures for requests for and the conduct of public hearings; for submission of written comments; and for requests for and conduct of conferences pursuant to an administrative proceeding before OFE. Hearings shall be convened at the request of any interested person, in accordance with section 701(d) of FUA, and shall be held at a time and place to be decided by the Presiding Officer.

§ 501.31 Written comments.

(a) New facilities. Except as may be provided elsewhere in these regulations, OFE shall provide a period of at least forty-five (45) days, commencing with publication of the Notice of Acceptance of Petition, of in the case of certification exemptions, Notice of Acceptance and availability of Certification, in the Federal Register in accordance with § 501.63(a), for submission of written comments concerning a petition for an exemption. Written comments shall be made in accordance with § 501.7.

(b) Existing facilities. Except as may be provided elsewhere in these regulations, OFE shall provide a period of at least 45 days for submission of written comments concerning a proposed prohibition rule or order or a petition for a permit. In the case of a proposed prohibition rule or order issued to an existing electing powerplant, OFE shall also provide for a period of at least 45 days for submission of written comments concerning a Tentative Staff Analysis. This period shall commence on the day after publication of the Notice of Availability of the Tentative Staff Analysis in the Federal Register. In the case of prohibition order proceedings for certifying powerplants under section 301 of FUA, as amended, OFE shall provide a period of at least 45 days, beginning the day after the Notice of Acceptance of certification is published, for submission of written comments concerning the certification and OFE's proposed prohibition order, and requests for public hearings. Prohibition order proceedings under section 301, as amended by OBRA, will have only one period of 45 days, since no Tentative Staff Analysis will be prepared. The comment period may be extended by OFE in accordance with § 501.7. See § 501.52(b) of this part for further information with respect to the comment period. Written comments shall be filed in accordance with § 501.7.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3289 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 50848, Nov. 10, 1982; 54 FR 52892, Dec. 22, 1989]

§ 501.32 Conferences (other than prepetition conferences).

(a) At any time following commencement of a proceeding before OFE, an interested person may request a conference with the staff of OFE to discuss a petition, permit or any other issue pending before OFE. The request for a conference should generally be in writing and should indicate the subjects to be covered and should describe the requester's interest in the proceeding. Conferences held after the commencement of an administrative proceeding before OFE shall be convened at the discretion of OFE or the Presiding Officer.

(b) When OFE convenes a conference in accordance with this section, any person invited may present views as to the issue or issues involved. Documentary evidence may be submitted at the conference and such evidence, to the extent that it is not deemed to be confidential, will be included in the administrative record. OFE will not normally have a transcript of the conference prepared but may do so at its discretion.

(c) Because a conference is solely for the exchange of views incident to a proceeding, there will be no formal report or findings by OFE unless OFE in its discretion determines that the preparation of a report or findings would be advisable. OFE will, however, place in the public file a record of any conference.

§ 501.33 Request for a public hearing.

(a) New facilities. In the case of a petition for an exemption under title II of FUA, any interested person may submit a written request that OFE convene a public hearing in accordance with section 701 of FUA no later than forty-five (45) days after publication of either the Notice of Acceptance of a petition, or in the case of a certification exemption, the publication of the Notice of Acceptance of Certification. This time period may be extended at the discretion of OFE.

(b) Existing powerplants. In the case of a petition for an exemption from a prohibition imposed by a final rule or order issued by OFE to an electing powerplant under former sections of title III of FUA or a petition for a permit under § 504.1, any interested person may submit a written request that OFE convene a public hearing in accordance with section 701 of FUA within 45 days after the notice of the filing of a petition is published in the Federal Register. In the case of a proposed prohibition rule or order issued to an electing powerplant under former section 301, the 45 day period in which to request a public hearing shall commence upon the publication of the Notice of Availability of the Tentative Staff Analysis. In the case of a proposed prohibition order to be issued to certifying powerplants under section 301 of FUA, as amended, the 45 day period in which to request a public hearing commences upon publication of the Notice of Acceptance of Certification. This time limit may be extended at the discretion of OFE in accordance with § 501.7.

(c) Contents of request. A request for a public hearing must be in writing and must include a description of the requesting party's interest in the proceeding and a statement of the issues involved. The request should, to the extent possible, identify any witnesses that are to be called, summarize the anticipated testimony to be given at the hearing, and outline questions that are to be posed.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 50848, Nov. 10, 1982; 54 FR 52892, Dec. 22, 1989]

§ 501.34 Public hearing.

(a) A public hearing under this subsection is for the purpose of insuring that all issues are fully and properly developed, but is not a formal adjudicatory hearing subject to the provisions of 5 U.S.C. 554 and 556.

(b) Opportunity to be heard at a public hearing. (1) Any interested person, may request, and OFE will provide, an opportunity to present oral or written data, views and arguments at a public hearing on any proposed prohibition rule or order, or on any petition for an exemption or permit. An interested person may file a request to be listed as a party to a hearing on the service list prepared by the Presiding Officer pursuant to § 501.34(d) of this part.

(2) Participants at the public hearing will have an opportunity to present oral or written data, views and arguments.

(3) A request for a public hearing may be withdrawn by the requestor at any time. If other persons have requested to participate as parties in the public hearing, OFE may cancel the hearing only if all parties agree to cancellation. OFE will give notice, whenever possible, in the Federal Register of the cancellation of any hearings for which there has been prior notice.

(c) Presiding Officer. OFE will appoint a Presiding Officer to conduct the public hearing.

(d) Powers of the Presiding Officer. The Presiding Officer is responsible for orderly conduct of the hearing and for certification of the record of the public hearing. The Presiding Officer will not prepare any recommended findings, conclusions, or any other recommendations for disposition of a particular case, except those of a procedural nature. The Presiding Officer has, but is not limited to the following powers:

(1) Administer oaths, affirmations and protective orders;

(2) Issue administrative subpoenas and rule on motions to modify or withdraw subpoenas that he has issued;

(3) Rule on questions as to relevance and materiality of evidence;

(4) Regulate the course of the public hearing;

(5) Hold conferences for the simplification of issues by consent of the parties;

(6) Require submission of evidence in writing where appropriate;

(7) Establish service lists;

(8) Dispose of procedural requests and similar matters; and

(9) Take other actions authorized by these rules.

The Presiding Officer may also limit the number of witnesses to be presented by any party and may impose reasonable time limits for testimony. The Presiding Officer shall establish and maintain a service list that contains the names and addresses of all parties to the OFE proceeding. At the time the Presiding Officer certifies the record, he will provide the staff of OFE with an index of the issues addressed in the record.

(e) Notice. OFE will convene a public hearing only after publishing a notice in the Federal Register that states the time, place and nature of the public hearing.

(f) Opportunity to question at the public hearing. At any public hearing requested pursuant to paragraph (b) of this section, with respect to disputed issues of material fact, OFE will provide any interested person an opportunity to question:

(1) Other interested persons who make oral presentations;

(2) Employees and contractors of the United States who have made written or oral presentations or who have participated in the development of the proposed rule or order or in the consideration of the petition for an exemption or permit; and

(3) Experts and consultants who have provided information to any person who makes an oral presentation and which is contained in or referred to in such presentation.

(g) OFE encourages persons who wish to question Government witnesses to submit their questions at least ten (10) days in advance of the hearing.

(h) The Presiding Officer will allow questions by any interested person to be asked of those making presentations or submitting information, data, analyses or views at the hearing. The Presiding Officer may restrict questioning if he determines that such questioning is duplicative or is not likely to result in a timely and effective resolution of issues pending in the administrative proceeding for which the hearing is being conducted.

(i) The Presiding Officer or OFE may exercise discretion to control a hearing by denying, temporarily or permanently, the privilege of participating in a particular OFE hearing if OFE finds, for example, that a person:

(1) Has knowingly made false or misleading statements, either orally or in writing;

(2) Has knowingly filed false affidavits or other writings;

(3) Lacks the specific authority to represent the person seeking an OFE action; or

(4) Has disrupted or is disrupting a hearing.

(j) Evidence. (1) The Presiding Officer is responsible for orderly submission of information, data, materials, views or other evidence into the record of the public hearing. The Presiding Officer may exclude any evidence that is irrelevant, immaterial or unduly repetitious. Judicial rules of evidence do not apply.

(2) Documentary material must be of a size consistent with ease of handling, transportation and filing, and a reasonable number of copies should be made available at the public hearing for the use of interested persons. An original and fourteen (14) copies shall be furnished to the Presiding Officer and one copy to each party listed on the service list. Large exhibits that are used during the hearing must be provided on no larger than 11 1/2″ × 14″ legal size paper if they are to be submitted into the hearing record.

(k) Hearing record. OFE will have a verbatim transcript made of the public hearing. The hearing record shall remain open for a period of fourteen (14) days following the public hearing, unless extended by OFE, during which time the participants at the hearing may submit additional written statements which will be made part of the administrative record and will be served by the Presiding Officer upon those parties listed on the service list. OFE may also request additional information, data or analysis following the hearing in order to resolve disputed issues in the record. If OFE receives or obtains any relevant information or evidence that is placed in the record after the close of the public hearing or comment period, it will so notify all participants, and allow an additional fourteen (14) days for submission of evidence in rebuttal. In addition, OFE may, in its discretion, re-open the hearing at the request of a party or participant, to permit further rebuttal of evidence or statements submitted to OFE and made part of the hearing record after the close of the hearing. The transcript, together with any written comments submitted in the course of the proceeding, will be made part of the record available for public inspection and copying at the OFE Public Information Office, as provided in § 501.12.

§ 501.35 Public file.

(a) Contents. The public file shall consist of the rule, order, or petition, with supporting data and supplemental information, and all data and information submitted by interested persons. Materials which are claimed by any party to be exempt from public disclosure under the Freedom of Information Act (5 U.S.C. 552) shall be excised from the public file provided OFE has made a determination that the material is confidential in accordance with § 501.7(a)(11) of this part.

(b) Availability. The public file shall be available for inspection at room 1E190, 1000 Independence Avenue SW., Washington, DC. Photocopies may be made available, on request. The charge for such copies shall be made in accordance with a written schedule.

[46 FR 59889, Dec. 7, 1981, as amended at 54 FR 52892, Dec. 22, 1989]

Subpart D Subpoenas, Special Report Orders, Oaths and Witnesses
§ 501.40 Issuance.

(a) Authority. As authorized by section 711 of FUA and section 645 of the DEOA, the Administrator, his duly authorized agent or a Presiding Officer may, in accordance with 10 CFR 205.8, sign, issue, and serve subpoenas; issue special report orders (SRO); administer oaths and affirmations; take sworn testimony, compel attendance of and sequester witnesses; control the dissemination of any record of testimony taken pursuant to this section; and subpoena and reproduce books, papers, correspondence, memoranda, contracts, agreements, or other relevant records of tangible evidence including, but not limited to, information retained in computerized or other automated systems in the possession of the subpoenaed person.

(b) Petition to withdraw or modify. Prior to the time specified for compliance in the subpoena or SRO, the person to whom the subpoena or SRO is directed may apply for its withdrawal or modification as provided in 10 CFR 205.8, except that if the subpoena or SRO is issued by a duly appointed Presiding Officer, the request to withdraw or modify must be addressed to that Presiding Officer, and its grant or denial will be decided by him.

Subpart E Prohibition Rules and Orders
§ 501.50 Policy.

Except in conjunction with a prohibition order requested by the intended recipient, OFE shall not propose to prohibit or prohibit by rule or order the use of petroleum or natural gas either as a primary energy source or in amounts in excess of the minimum amount necessary to maintain reliability of operation consistent with reasonable fuel efficiency in an existing installation unless and until OFE adopts rules establishing regulatory requirements governing the issuance of such orders and rules in accordance with the applicable procedural and substantive requirements of law.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[47 FR 50848, Nov. 10, 1982]

§ 501.51 Prohibitions by order—electing powerplants.

(a) OFE may prohibit by order the use of petroleum or natural gas as a primary energy source or in amounts in excess of the minimum amount necessary to maintain reliability of operation consistent with reasonable fuel efficiency in an electing powerplant, if:

(1) That facility has not been identified as a member of a category subject to a final rule at the time of the issuance of such order; and

(2) The requirements of § 504.6 have been met.

(b) Notice of order and public participation. (1) OFE may hold a conference with the proposed order recipient prior to issuing the proposed order.

(2) Pursuant to section 701 of FUA, prior to the issuance of a final order to an electing powerplant, OFE shall publish a proposed order in the Federal Register together with a statement of the reasons for the order. In the case of a proposed order that would prohibit the use of petroleum or natural gas as a primary energy source, the finding required by former section 301(b)(1) of the Act shall be published with such proposed order.

(3) OFE shall provide a period for the submission of written comments of at least three months after the date of the proposed order. During this period, the recipient of the proposed order and any other interested person must submit any evidence that they have determined at that time to support their respective positions as to each of the findings that OFE is required to make under section 301(b) of the Act. A proposed order recipient may submit additional new evidence at any time prior to the close of the public comment period which follows publication of the Tentative Staff Analysis or prior to the close of the record of any public hearing, whichever occurs later. A request by the proposed order recipient for an extension of the three-month period may be granted at OFE's discretion.

(4) Subsequent to the end of the comment period, OFE will issue a notice of whether OFE intends to proceed with the prohibition order proceeding.

(5) An owner or operator of a facility that may be subject to an order may demonstrate prior to issuance of a final prohibition order that the facility would qualify for an exemption if the prohibition had been established by rule. OFE will not delay the issuance of a final prohibition order or stay the effective date of such an order for the purpose of determining whether a proposed order recipient qualifies for a particular exemption unless the demonstration or qualification is submitted prior to or during the second three-month comment period, commencing after issuance of a notice of intention to proceed, or unless materials submitted after the period (i) could not have been submitted during the period through the exercise of due diligence, (ii) address material changes in fact or law occurring after the close of the period, or (iii) consist of amplification or rebuttal occasioned by the subsequent course of the proceeding. A request by the proposed order recipient for an extension of this time period may be granted at OFE's discretion.

(6) Subsequent to the end of the second three (3) month period, OFE will, if it intends to issue a final prohibition order, prepare and issue a Notice of Availability of a Tentative Staff Analysis. Interested persons wishing a hearing must request a hearing within forty-five (45) day after issuance of the Notice of Availability of the Tentative Staff Analysis. During this forty-five (45) days period, interested persons may also submit written comments on the Tentative Staff Analysis.

(7) If a hearing has been requested, OFE shall provide interested persons with an opportunity to present oral data, views and arguments at a public hearing held in accordance with subpart C of this part. The hearing will consider the findings which OFE must make in order to issue a final prohibition order and any exemption for which the proposed order recipient submitted its demonstration in accordance with paragraph (b)(5) of this section.

(8) Upon request by the recipient of the proposed prohibition order, the combined public comment periods provided for in this section may be reduced to a minimum of forty-five (45) days from the time of publication of the proposed order.

(9) OFE may terminate a prohibition order proceeding at any time prior to the date upon which a final order shall become effective. Should OFE terminate the proceeding, it will notify the proposed order recipient, and publish a notice in the Federal Register.

(c) Decision to issue a final order. (1) OFE will base its determination to issue an order on consideration of the whole record or those parts thereof cited by a party and supported by and in accordance with reliable, probative and substantial evidence.

(2) OFE shall include in the final order a written statement of the pertinent facts, a statement of the basis upon which the final order is issued, a recitation of the conclusions regarding the required findings and qualifications for exemptions. The final order shall state the effective date of the prohibition contained therein. If it is demonstrated that the facility would have been granted a temporary exemption, the effective date of the prohibition contained in the final order shall be delayed until such time as the temporary exemption would have terminated. If it is demonstrated that a facility will need a period of time to comply with the final order, the effective date of the prohibition contained in the final order may be delayed, in OFE's discretion, so as to allow an order recipient to comply with the final order.

(3) OFE will enclose with a copy of the final order, where appropriate, a schedule of steps that should be taken by a stated date (a compliance schedule) to ensure that the affected facility will be able to comply with the prohibitions stated in the order by the effective date of the prohibition contained in the final order. The compliance schedule may require the affected person to take steps with regard to a unit 60 days after service of the final order.

(4) A copy of the final order and a summary of the basis therefore will be published in the Federal Register. The order will become effective 60 days after publication in the Federal Register.

(d) Request for order. (1) A proceeding for issuance of a prohibition order to a specific unit may be commenced by OFE, in its sole discretion, in response to a request for an order filed by the owner or operator of a facility.

(2) A petition requesting OFE to commence a prohibition order proceeding should include the following information for all units to be covered by the prohibition order:

(i) A statement of the reasons the owner or operator is seeking the issuance of a prohibition order; and

(ii) Sufficient information for OFE to make the findings required by section 301(b) of FUA.

(3) If OFE determines to accept the request, OFE shall publish a proposed order in the Federal Register together with a statement of the reasons for the order.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Energy Supply and Environmental Coordination Act of 1974; Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 17042, Apr. 21, 1982; 47 FR 50848, Nov. 10, 1982; 54 FR 52892, Dec. 22, 1989]

§ 501.52 Prohibitions by order—certifying powerplants.

(a) OFE may prohibit by order the use of petroleum or natural gas as a primary energy source or in amounts in excess of the minimum amount necessary to maintain reliability of operation consistent with maintaining reasonable fuel efficiency in an existing powerplant if the owner or operator of the powerplant certifies, and OFE concurs in such certification in accordance with the requirements of §§ 504.5, 504.6 and 504.8.

(b) Notice of order and participation. (1) OFE may hold a conference with the proposed order recipient, at the recipient's election, prior to issuing the proposed order. The conference may resolve any questions regarding the certification required by section 301 of the Act, as amended, and §§ 504.5, 504.6, and 504.8, and OFE's review and concurrence therein.

(2) Pursuant to section 701(b) of FUA, prior to the issuance of a final order to a certifying powerplant owner or operator, OFE must publish in the Federal Register, a proposed prohibition order stating the reasons for such order. OFE will review all of the information submitted by a proposed order recipient within 60 days after receipt by OFE. If the certification is complete, OFE will, within 30 days after the end of the 60 day review period, publish in the Federal Register a Notice of Acceptance of certification together with a proposed prohibition order stating therein the reasons for such order. This commences the prohibition order proceeding. If OFE does not believe it is able to concur in the certification, OFE shall notify the proposed order recipient and shall publish a Notice of Proposed Non-Concurrence in the Federal Register within 30 days after the end of the 60 day review period. If OFE finds that the certification with compliance schedule is incomplete, OFE will notify the proposed prohibition order recipient as to the deficiencies, and provide an additional period of 30 days for the certification to be amended and resubmitted. If a complete certification is not submitted within this period, the proceeding shall be terminated in accordance with § 501.52(b)(5). OFE will notify the proposed order recipient and other parties to the proceeding of the termination and publish a notice in the Federal Register. OFE, on its own motion, may extend any period of time by publishing a notice to that effect in the Federal Register.

(3) The publication of the Notice of Acceptance or Notice of Proposed Non-Concurrence commences a period of 45 days during which interested persons may submit written comments or request a public hearing. During this period, the recipient of the proposed order and any other interested person may submit any evidence that they have available relating to the proposed order, the certification or the concurrence that OFE must make. A proposed order recipient may submit additional new evidence at any time prior to the close of the public comment period which follows the commencement of the proceeding or prior to the close of the record of any public hearing, whichever occurs later. A request for an extension of the 45 day period may be granted at OFE's discretion. In the case of a Notice of Acceptance, as set forth in § 504.9, no final prohibition order can be issued until any necessary environmental review pursuant to the National Environmental Policy Act of 1969, 42 U.S.C 4321 et seq. (NEPA) has been completed. Upon completion of the NEPA review and unless OFE determines on the basis of the record of the proceeding that the certification fails to meet the requirements of §§ 504.5, 504.6, and 504.8, OFE shall publish a final prohibition order, together with the information required by paragraph (c) of this section. In the case of a Notice of Proposed Non-Concurrence, at the end of the 45 day comment period, OFE will notify the proposed order recipient and parties to the proceeding and publish a final Notice of Non-Concurrence in the Federal Register, if OFE determines it cannot concur in the certification based upon additional information submitted during the proceeding. If, at the end of the 45 day period, OFE believes it can concur in the certification, OFE will notify the proposed order recipient and parties to the proceeding and publish a Notice of Acceptance followed by a new 45 day comment period.

(4) If a hearing has been requested, OFE shall provide interested persons with an opportunity to present oral data, views and arguments at a public hearing held in accordance with subpart C of this part. The hearing may consider, among other matters, the sufficiency of the certification of the owner or operator of the powerplant required by section 301 of FUA, as amended, and §§ 504.5, 504.6, and 504.8 of these regulations.

(5) OFE may terminate a prohibition order proceeding at any time prior to the date upon which a final prohibition order is issued whenever OFE believes, from any information contained in the record of the proceeding, that the certification does not meet the requirements of section 301 of the Act, as amended, or §§ 504.5, 504.6, and 504.8 of these regulations. If OFE terminates the proceeding or publishes a final Notice of Non-Concurrence, or the proposed order recipient fails to submit a complete certification, OFE will notify the proposed order recipient and other parties to the proceeding and publish a notice in the Federal Register. In such event, the proposed order recipient may submit a new certification under any provision of section 301 of the Act, as amended, at a later date. Specifically, a Notice of Non-Concurrence under either section 301(b) or 301(c) shall not affect a proposed order recipient's ability to make a certification under the other subsection.

(c) Record and decision to issue a final order. (1) OFE will base its determination to issue an order on consideration of the whole record or those parts thereof cited by a party and supported by and in accordance with reliable, probative and substantial evidence.

(2) OFE shall include in the final order a written statement of the basis upon which the final order is issued, and its concurrence in the required certification. A copy of the final order and a summary of the basis therefor will be published in the Federal Register. While the prohibition order is final for purposes of judicial review under section 702 of FUA, the prohibitions contained in the final order shall not become effective for purposes of amendment under section 301(d) of FUA, as amended, and § 501.52(d) of these regulations until the effective date of the prohibitions stated in the order, or, where the order is subject to one or more conditions subsequent listed in the prohibition order compliance schedule, until all its conditions are met.

(d) Amendment to certifications under §§ 504.5 and 504.6. The proposed prohibition order recipient may amend its compliance schedule under § 504.5(d), or its certification under section 301 of FUA, as amended, and §§ 504.5, 504.6 and 504.8 of these regulations in order to take into account changes in relevant facts and circumstances at any time prior to the effective date of the prohibitions contained in the final prohibition order.

(e) Rescission of prohibition orders. The rescission or modification of final prohibition orders issued to existing electric powerplants will be governed by the procedure in § 501.101 of these regulations.

(Approved by the Office of Management and Budget under control number 1903-0077)

(Department of Energy Organization Act, Pub. L. 95-91, 42 U.S.C. 7101 et seq.; Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620, 15 U.S.C. 719 et seq.; Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35, 42 U.S.C. 8301 et seq.; Omnibus Budget Reconciliation Act of 1981, (Pub. L. 97-35))

[47 FR 17042, Apr. 21, 1982]

§§ 501.53-501.56 [Reserved]
Subpart F Exemptions and Certifications
§ 501.60 Purpose and scope.

(a) (1) If the owner or operator plans to construct a new baseload powerplant and the unit will not be in compliance with the prohibition contained in section 201(a) of FUA, this subpart establishes the procedures for filing a petition requesting a temporary or permanent exemption under, respectively, sections 211 and 212 of FUA.

(2) Self-certification alternative. If the owner or operator plans to construct a new baseload powerplant not in compliance with the prohibitions contained in section 201(a) of FUA, this subpart establishes the procedures for the filing of a self-certification under section 201(d) of FUA.

(3) If the petitioner owns, operates or controls a new powerplant, this subpart provides the procedures for filing a petition requesting extension of a temporary exemption granted under sections 211 or 311 of FUA.

(4) If the petitioner owns, operates or controls a new or existing powerplant or MFBI, this subpart provides the procedures for filing a petition requesting extension of a temporary exemption granted under section 211 or section 311 of FUA.

(b) If the petition is for an extension of a temporary exemption, the petitioner must apply for this extension at least (90) days prior to the expiration of the temporary exemption.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35; E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 50849, Nov. 10, 1982; 54 FR 52892, Dec. 22, 1989]

§ 501.61 Certification contents.

(a) A self-certification filed under section 201(d) of FUA should include the following information:

(1) Owner's name and address.

(2) Operator's name and address.

(3) Plant location and address.

(4) Plant configuration (combined cycle, simple cycle, topping cycle, etc.)

(5) Design capacity in megawatts (MW).

(6) Fuel(s) to be used by the new facility.

(7) Name of utility purchasing electricity from the proposed facility and percent of total output to be sold.

(8) Date unit is expected to be placed in service.

(9) Certification by an officer of the company or his designated representative certifying that the proposed facility:

(i) Has sufficient inherent design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or another alternate fuel as its primary energy source; and

(ii) Is not physically, structurally, or technologically precluded from using coal or another alternate fuel as its primary energy source.

(b) A self-certification filed pursuant to § 501.61(a) shall be effective to establish compliance with the requirement of section 201(a) of FUA as of the date filed.

(c) OFE will publish a notice in the Federal Register within fifteen days reciting that the certification has been filed. Publication of this notice does not serve to commence a public comment period.

(d) OFE will notify the owner or operator within 60 days if supporting documentation is needed to verify the certification.

[54 FR 52892, Dec. 22, 1989]

§ 501.62 Petition contents.

(a) A petition for exemption should include the following information:

(1) The name of the petitioner;

(2) The name and location of the unit for which an exemption is being requested;

(3) The specific exemption(s) being requested; and

(4) The name, address, and telephone number of the person who can supply further information.

(b) Table of contents. Include only those sections contained in the petition.

(c) Introduction. Include the following:

(1) Description of the facility under consideration;

(2) Description of the unit and fuel the petitioner proposes to burn in that unit, including the purpose of and need for the unit; and

(3) Description of the operational requirements for the unit, including size (capacity, input and output in millions of Btu's per hour), output in terms of product or service to be supplied, fuel capability, and operating mode, including capacity factor, utilization factor, and fluctuations in the load.

(d) General requirements. The evidence required under part 503 subpart B for each exemption(s) for which the petitioner is applying:

(1) No alternate power supply (§ 503.8):

(2) Use of mixtures (§ 503.9);

(3) Alternative site (§ 503.11);

(4) Compliance Plan (§ 503.12);

(5) Environmental impact analysis (§ 503.13);

(6) Fuels search (§ 503.14).

(e) Specific evidence. Evidence required for each exemption, segregated by exemption (part 503 subparts C and D).

(f) References. (1) Specify the reports, documents, experts, and other sources consulted in compiling the petition. Cite these sources in accordance with acceptable documentation standards, and indicate the part of the petition to which they apply. If the source is unusual or little known, briefly describe its contents.

(2) Identify at the end of each section of the petition any information or any statement based, in whole or in part, on information or principles which, to petitioner's knowledge, represent significant innovations to or departures from generally accepted facts or principles.

(g) Appendices. Include in the appendices material which the petitioner believes substantiates any analyses fundamental to the petition, materials prepared in connection with it, and any other documents, studies, or analyses which are believed to be relevant to the decision to be made. Also, include in the appendices copies of any forms submitted as part of the petition.

(h) List of preparers. List the names with the qualifications and professional credentials of the principal contributors to the preparation of the petition. Indicate the sections or subject matters for which each principal contributor was responsible.

(i) Incorporation by reference. Pertinent information may be incorporated into the petition by reference when this can be done without impeding agency and public review. Referenced materials must be specifically identified and their contents briefly described in the petition. To incorporate by reference, the material must be submitted with the petition, or if previously submitted, the office to which it was submitted must be identified in the petition. The petitioner cannot incorporate by reference material based on proprietary data not available to OFE for review.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35; E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 50849, Nov. 10, 1982]

§ 501.63 Notice of the commencement of an administrative proceeding on an exemption petition.

(a)(1) When a petition is accepted, OFE will publish in the Federal Register a Notice of Acceptance, or, in the case of a certification exemption, a Notice of Acceptance and Availability of Certification, signifying that an exemption proceeding has commenced. The notice will include a summary of the exemption petition, and publication will commence a public comment period of no less than forty-five (45) days during which interested parties may file written comments concerning the petition. In the case of a certification exemption, interested persons may request a public hearing during this period, pursuant to § 501.33.

(2) OFE will notify the appropriate State agency having apparent primary authority to permit or regulate the construction or operation of a powerplant that an exemption proceeding has commenced and will consult with this agency to the maximum extent practicable. Copies of all accepted petitions also will be forwarded to EPA, as provided in § 501.14(a).

(b) In processing an exemption petition, OFE shall comply with the requirements of the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality's implementing regulations, and the DOE guidelines implementing those regulations (45 FR 20694, Mar. 28, 1980). Compliance with NEPA may involve the preparation of (1) an environmental impact statement (EIS) evaluating the grant or denial of an exemption petition, (2) an environmental assessment (EA), or (3) a memorandum to the file finding that the grant of the requested petition would not be considered a major federal action significantly affecting the quality of the human environment. If an EIS is required, OFE will publish in the Federal Register a Notice of Intent (NOI) to prepare an EIS as soon as practicable after commencement of the proceeding. A public meeting may be held pursuant to 40 CFR 1501.7 to solicit comments or suggestions on the structure and content of the EIS.

[46 FR 59889, Dec. 7, 1981, as amended at 54 FR 52893, Dec. 22, 1989]

§ 501.64 Publication of notice of availability of tentative staff analysis.

OFE will publish in the Federal Register a Notice of the Availability of Tentative Staff Analysis for the noncertification temporary public interest exemption, for noncertification environmental exemptions, and for a cogeneration exemption based on the public interest. OFE will provide a public comment period of at least fourteen (14) days from the date of publication during which interested persons may make written comments and request a public hearing.

§ 501.65 Publication of notice of availability of draft EIS.

A Notice of Availability of any draft EIS will be published in the Federal Register and comments thereon will also be solicited. Interested persons may request a hearing on any draft EIS. Such hearing must be requested within thirty (30) days of publication of the Notice of Availability of the draft EIS.

[54 FR 52893, Dec. 22, 1989]

§ 501.66 OFE evaluation of the record, decision and order.

(a) The administrative record in a proceeding under this part will consist of the proposed prohibition order and/or petition and related documents, all relevant evidence presented at the public hearing, all written comments, and any other information in the possession of OFE and made a part of the public record of the proceeding. OFE will base its determination to issue a rule or order on consideration of the whole record, or those parts thereof cited by a party and supported by reliable, probative, and substantial evidence.

(b) OFE may investigate and corroborate any statement in any petition, document, or public comments submitted to it. OFE also may use any relevant facts it possesses in its evaluation and may request submissions from third persons relevant to the petition or other documents. OFE also may request additional information, data, or analyses following a public hearing, if any, if this information is necessary to resolve disputed issues in the record. Any relevant information received by OFE following the hearing that is not declared to be confidential under § 501.7(a)(11) shall be made part of the public record with opportunity provided for rebuttal.

(c) OFE will notify all participants if, after the close of any public hearing or comment period, it receives or obtains any relevant information or evidence. Participants may respond to such information or evidence in writing within fourteen (14) days of such notification. If OFE finds that the additional information or evidence relates to material issues of disputed fact and may significantly influence the outcome of the proceeding, OFE shall reopen the hearing on the issue or issues to which the additional information or evidence relates.

§ 501.67 Petition redesignations.

OFE, with the petitioner's approval, will redesignate an exemption petition if the petitioner qualifies for an exemption other than the one originally requested, even though he may not qualify for the specific exemption originally requested, or be entitled to the full exemption period provided by requested exemption. OFE shall give public notice of any redesignation of an exemption petition, and where a public hearing has been requested notice shall be given at least thirty (30) days prior to such hearing.

§ 501.68 Decision and order.

(a)(1) OFE shall issue an order either granting or denying the petition for an exemption or permit within six (6) months after the end of the period for public comment and hearing applicable to any petition.

(2) OFE may extend the six (6) month period for decision to a date certain by publishing notice in the Federal Register, and stating the reasons for such extension.

(3) OFE will publish a final EIS at least thirty (30) days prior to take issuance of the final order in all cases where an EIS is required.

(b)(1) OFE shall serve a copy of the order granting or denying a petition for exemption to the petitioner and all persons on the service list in cases involving a public hearing.

(2) OFE shall publish any order granting or denying a petition under this subpart in the Federal Register together with a statement of the reasons for the grant or denial.

(c)(1) Any order granting or denying a petition for exemption shall be based upon consideration of the whole record or those parts thereof cited by a party and supported by, and in accordance with, reliable, probative and substantive evidence.

(2) The denial of a petition for exemption shall be without prejudice to the petitioner's right to submit an amended petition. OFE may, however, reject the amended petition if it is not materially different from the denied petition.

(d) OFE may design any terms and conditions included in any temporary exemption issued or extended under section 211 of FUA, to ensure, among other things, that upon expiration of the exemption the persons and powerplant covered by the exemption will comply with the applicable prohibitions under FUA. For purposes of the provision, the subsequent grant of a permanent exemption to the subject unit shall be deemed compliance with applicable prohibitions.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35; E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[46 FR 59889, Dec. 7, 1981, as amended at 47 FR 50849, Nov. 10, 1982; 54 FR 52893, Dec. 22, 1989]

§ 501.69 Judicial review.

Any person aggrieved by any order issued by OFE under this subpart, must file, within sixty (60) days of publication of the final order in the Federal Register, a petition for judicial review in the United States Court of Appeals for the Circuit wherein he resides, or has his principal place of business. Exhaustion of administrative remedies for purposes of judicial review does not require filing a petition pursuant to subpart G for modification or rescission of the order to be reviewed.

Subpart G Requests for Modification or Rescission of a Rule or Order
§ 501.100 Purpose and scope.

(a) Anyone may request that OFE commence a rulemaking proceeding pursuant to 5 U.S.C. 553(e); however, this subpart provides the procedures to be followed by—

(1) An interested person seeking the modification or rescission of a prohibition by rule applicable to a new facility;

(2) An owner or operator of a facility named in a prohibition by rule requesting the modification or rescission of that rule; or

(3) An owner or operator subject to an exemption order or a specific prohibition imposed by order requesting the modification or a rescission of that order.

(b) OFE also may commence a modification or rescission proceeding on its own initiative.

§ 501.101 Proceedings to modify or rescind a rule or order.

(a) In response to a request duly filed by an interested person, OFE may commence a proceeding to modify or rescind a rule or order. If OFE determines that a request to modify or rescind a rule or order does not warrant commencement of a proceeding, it will deny the request and issue a brief statement of the reason(s) for the denial.

(b) A request for modification or rescission of a rule or order must comply with the requirements of § 501.7 and must be filed at the address set forth in § 501.11.

(c) Notice of the request for modification or rescission of an order must be given by the requester to each party to the original proceeding that resulted in the issuance of the original order for which modification or rescission is sought. If the number of parties to the original proceeding is too large to allow actual notice at a reasonable cost or within a reasonable time, a requester may ask that OFE give notice to the parties by publication in the Federal Register; however, this alternate notice does not bind OFE to commence a proceeding, if it subsequently determines that the request is not warranted.

(d) If OFE determines to grant a request to commence a proceeding to rescind or modify a rule or order, or OFE on its own initiative, commences a proceeding for the modification or rescission of a rule or order, it will give notice, either by service of a written notice or by oral communication (which communication must be promptly confirmed in writing) to each person upon whom the order was served that OFE proposes to modify or rescind, or, alternatively, by publication of notice in the Federal Register. OFE will give a reasonable period of time for each person notified to file a written response.

(e)(1) A copy of any written comments submitted to OFE under this subpart by a party to the original proceeding must also be sent to the requester. The party submitting such comments must certify to OFE that he has sent a copy of such comments to the requester.

(2) OFE may notify other persons participating in the proceeding of the comments and provide an opportunity for those notified to respond.

(f) A request for modification or rescission of a rule or order must contain a complete statement of all facts relevant to the action sought. The request must also include the names and addresses of all reasonably ascertainable persons who will be affected. Pertinent provisions contained in any documents believed to support a request may be briefly described, however, OFE reserves the right to obtain copies of any significant documents that will assist in making a determination on the merits of a request. The request must identify the specific order or rule for which modification or rescission is sought. A request should also indicate whether an informal conference will facilitate OFE's determination to commence, or not to commence a proceeding, or will assist OFE in making any determinations on material issues raised by the request.

(g) A decision by OFE to commence a proceeding under this subpart does not entitle the requester to a public hearing on the request for modification or rescission. A public hearing may be held, however, if, in its discretion, OFE considers that a public hearing will advance its evaluation of the request.

§ 501.102 OFE evaluation of the record, decision and order for modification or rescission of a rule or order.

(a) OFE will consider the entire administrative record in its evaluation of the decision and order for modification or rescission of a rule or order. OFE may investigate and corroborate any statement in the petition or related documents and may utilize in its evaluation any relevant facts obtained by its investigations. OFE may solicit or accept submissions from third persons relevant to any request under this subpart and all interested persons will be afforded an opportunity to respond to these submissions. OFE may, in its discretion and on its own initiative, convene a conference, if it considers that a conference will advance its evaluation of the request.

(b) Criteria. Except where modification or rescission of a rule or order is initiated by OFE, OFE's decision to rescind or modify a rule or order will be based on a determination that there are significantly changed circumstances with respect to the applicability of a particular prohibition or exemption to the requester. OFE believes that there may be “significantly changed circumstances”, if:

(1) Significant material facts are subsequently discovered which were not known and could not have been known to the petitioner or to OFE at the time of the original proceeding;

(2) A law, regulation, interpretation, ruling, order or decision on appeal that was in effect at the time of the proceeding upon which the rule or order is based and which, if it had been made known to OFE, would have been relevant to the proceeding and would have substantially altered the outcome is subsequently discovered; or

(3) There has been a substantial change in the facts or circumstances upon which an outstanding and continuing order was based, which change occurred during the interval between issuance of the order and the date of filing of the request under this subpart, and was caused by force or circumstances beyond the requester's control.

§ 501.103 OFE decision.

(a) OFE shall issue an appropriate rule or order after considering the request for modification or rescission of a rule or order and other relevant information received during the proceeding.

(b) OFE will either grant or deny the request for modification or rescission and will briefly state the pertinent facts and legal basis for the decision.

(c) OFE will serve the rule or order granting or denying the request for modification or rescission upon the requester, or, if the action was initiated by OFE, upon the owner or operator of the affected powerplant or installation. OFE will publish a notice of the issuance of a rule or order modifying or rescinding a rule or order in the Federal Register.

Subpart H Requests for Stay
§ 501.120 Purpose and scope.

(a) This subpart sets forth the procedures for the request and issuance of a stay of a rule or order or other requirement issued or imposed by OFE or these regulations but does not apply to the mandatory stays provided for in sections 202(b) and 301(a) of FUA. The application for a stay under this subpart will only be considered incidental to a proceeding on a request for modification or rescission of a final prohibition rule or order.

(b) The petitioner must comply with all final and effective OFE orders, regulations, rulings, and generally applicable requirements unless a petition for a stay is granted or is applicable under FUA.

§ 501.121 Filing and notice of petitions for stays.

(a)(1) The petition for a stay must be in writing and comply with the general filing requirements stated in § 501.7, in addition to any other requirements set forth in this subpart, and must be filed at the address provided in § 501.11.

(2) A claim for confidential treatment of any information contained in the petition for stay and supporting documents must be in accordance with § 501.7(a)(11), and filed at the address provided in § 501.11.

(b) OFE will publish notice of receipt of a petition for a stay under this subpart in the Federal Register.

§ 501.122 Contents.

(a) A petition for a stay shall contain a full and complete statement of all facts believed to be pertinent to the act or transaction for which a stay is sought. The facts shall include, but not be limited to, the criteria listed below in § 501.123(b).

(b) The petitioner may request a conference regarding the application. If the request is not made at the time the application is filed, it must be made as soon thereafter as possible. The request and OFE's determination regarding it will be made in accordance with subpart C of this part.

§ 501.123 Evaluation of the record.

(a) The record in a proceeding on a petition for stay shall consist of the petition and any related documents, evidence submitted at any public proceedings and any other information in the possession of OFE and made part of the record. OFE may investigate and corroborate any statement in the petition or any other document submitted to it and may utilize in its evaluation any relevant facts obtained by its investigations. OFE may solicit or accept submissions from third persons relevant to the petition for stay or other document and any interested person will be afforded an opportunity to respond to these submissions. OFE, on its initiative, may convene a conference, if, in its discretion, it considers that the conference will advance its evaluation of the petition.

(b) Criteria. (1) OFE may grant a stay incident to a proceeding on a petition for modification of a rule or order if the petitioner shows:

(i) Irreparable injury will result if the stay is denied;

(ii) There is a strong likelihood of success on the merits;

(iii) The denial of a stay will result in a more immediate hardship or inequity to the petitioner than to other persons affected by the proceeding; and

(iv) It would be desirable for reasons of public policy to grant the stay.

§ 501.124 Decision and order.

(a) OFE will issue an order granting or denying the petition for a stay upon consideration of the request and other relevant information received or obtained during the proceeding.

(b) OFE will include in the order a brief written statement setting forth the relevant facts and the basis of the decision, including any appropriate terms and conditions of the stay.

Subpart I Requests for Interpretation
§ 501.130 Purpose and scope.

This subpart establishes procedures for filing a formal request for and the issuance of an interpretation of a rule, order or other action by DOE. Any response, whether oral or written, to a general inquiry, or to other than a formal written request for interpretation filed with DOE, is not an interpretation and merely provides general information that may not be relied upon in any proceeding to determine compliance with the applicable requirements of FUA.

§ 501.131 Filing a request for interpretation.

A proceeding to request an interpretation is commenced by the filing of a “Request for Interpretation (FUA).” The request must be in writing and must also comply with the general filing requirements stated in § 501.7. Any claims for confidential treatment for any information contained in the request or other related documents must be made pursuant to § 501.7(a)(11). A request for interpretation should be filed with the Assistant General Counsel for Interpretations and Rulings at the address provided in § 501.11.

§ 501.132 Contents of a request for interpretation.

(a) A request for an interpretation must contain a complete statement of all the facts believed to be relevant to the circumstances, acts or transactions that are the subject of the request. The facts must include the names and addresses of all potentially affected persons (if reasonably ascertainable) and a full discussion of the pertinent provisions and relevant facts contained in any documents submitted with the request. Copies of relevant contracts, agreements, leases, instruments, and other documents relating to the request must be submitted if DOE believes they are necessary for determination of any issue pending in the proceeding under this subpart. When the request pertains to only one step in a larger integrated transaction, the requesting party must also submit the facts, circumstances, and other relevant information pertaining to the entire transaction.

(b) The requesting party must include in the request a discussion of all relevant legal authorities, rulings, regulations, interpretations and decisions on appeal relied upon to support the particular interpretation sought.

(c) DOE may refuse to issue an interpretation if it determines that there is insufficient information upon which to base an interpretation.

§ 501.133 DOE evaluation.

(a)(1) The record shall consist of the request for an interpretation and any supporting documents, all relevant evidence presented at any public proceedings, written comments and any information in the possession of DOE that has been made part of the record.

(2) DOE may investigate and corroborate any statement in a request or related documents and may utilize in its evaluation any relevant facts obtained by the investigation. DOE may solicit or accept submissions from third persons relevant to the request for interpretation, or any other document submitted under this subpart, and the person requesting the interpretation will be afforded an opportunity to respond to these submissions.

(3) The General Counsel or his delegate will issue an interpretation on the basis of the information provided in the request, unless that information is supplemented by other information brought to the attention of DOE during the proceeding. DOE's interpretation will, therefore, depend on the accuracy of the factual statements, and the requesting party may rely upon it only to the extent that the facts of the actual situation correspond to those upon which the interpretation is based.

(b) Criteria. (1) DOE will base its FUA interpretations on the DEOA and FUA, as applicable, and the regulations and published rulings of DOE as applied to the specific factual situation presented.

(2) DOE will take into consideration previously issued interpretations dealing with the same or a related issue.

§ 501.134 Issuance and effect of interpretations.

(a) DOE may issue an interpretation after consideration of the request for interpretation and other relevant information received or obtained during the proceeding.

(b) The interpretation will contain a written statement of the information upon which it is based and a legal analysis of and conclusions regarding the application of rulings, regulations and other precedent to the situation presented in the request.

(c) Only those persons to whom an interpretation is specifically addressed, and other persons upon whom the DOE serves the interpretation and who are directly involved in the same transaction or act, are entitled to rely upon it. No person entitled to rely upon an interpretation shall be subject to civil or criminal penalties stated in title VII of FUA for any act taken in reliance upon the interpretation, notwithstanding that the interpretation shall thereafter be declared by judicial or other competent authority to be invalid.

(d) DOE may at any time rescind or modify an interpretation on its own initiative. Rescission or modification shall be made by notifying persons entitled to rely on the interpretation that it is rescinded or modified. This notification will include a statement of the reasons for the rescission or modification and, in the case of a modification, a restatement of the interpretation as modified.

(e) An interpretation is modified by a subsequent amendment to the regulations or ruling to the extent that it is inconsistent with the amended regulation or ruling.

(f) Any person who believes he is directly affected by an interpretation issued by DOE, and who believes that he will be aggrieved by its implementation, may submit a petition for reconsideration of that interpretation to the General Counsel. DOE will acknowledge receipt of all requests for reconsideration; however, this acknowledgement in no way binds DOE to commence any proceeding on the request. If within sixty (60) days of DOE's acknowledgement of the receipt of a request for reconsideration, DOE has not issued either a notice of intent to commence a proceeding to reconsider the interpretation or a modification, revision or rescission of the original interpretation, the request for reconsideration will be deemed denied. DOE may, in its discretion, issue a formal denial of a request for reconsideration if:

(1) The request has not been filed in a timely manner, and good cause therefor has not been shown;

(2) The person requesting reconsideration is not aggrieved or otherwise injured substantially by the interpretation; or

(3) The request is defective because it fails to state and to present facts and legal argument that the interpretation was erroneous in fact or in law, or that it was arbitrary or capricious.

Subpart J Rulings
§ 501.140 Purpose and scope.

DOE may issue rulings in accordance with the provisions of this subpart. DOE will publish each ruling in the Federal Register and in 10 CFR part 518. A person is entitled to rely upon a ruling to the extent provided in this subpart.

§ 501.141 Criteria for issuance.

(a) The General Counsel may issue a ruling whenever:

(1) There has been a substantial number of inquiries with regard to similar factual situations or a particular section of the regulations; or

(2) It is determined that a ruling will be of assistance to the public in applying the regulations to a specific situation.

§ 501.142 Modification or rescission.

(a) A ruling may be modified or rescinded by—

(1) Publication of the modification or rescission by DOE in the Federal Register and in 10 CFR part 518; or

(2) Adoption of a rule that supersedes or modifies a prior ruling.

(b) A person shall not be subject to the sanctions or penalties stated in these regulations for actions taken in reliance upon a ruling, notwithstanding that the ruling is subsequently declared to be invalid or no longer applicable. A person affected by a ruling may not rely upon it for more than 30 days after it has been rendered invalid pursuant to issuance of a superseding rule by OFE, or after it has been rescinded or modified by DOE.

§ 501.143 Comments.

Any interested person may file a written comment on or objection to a published ruling at any time with the Assistant General Counsel for Interpretations and Rulings at the address provided in § 501.11.

Subpart K Enforcement
§ 501.160 Purpose and scope.

This subpart provides the procedures by which OFE may initiate enforcement proceedings on its own behalf and by which complaints concerning a violation of the Act or any rule or order thereunder may be filed.

§ 501.161 Filing a complaint.

(a) A complaint under this subpart must be submitted in writing over the signature of the person making the complaint in accordance with the general filing requirements stated in § 501.7. OFE will accept oral complaints that otherwise satisfy the requirements of this subpart, but OFE may request written verification.

(b) A complaint shall be filed at the address provided in § 501.11.

§ 501.162 Contents of a complaint.

A complaint must contain a complete statement of all relevant facts pertaining to the act or transaction that is the subject of the complaint. It must also include the names and addresses of all persons involved (if reasonably ascertainable), a description of the events that led to the complaint, and a statement describing the statutory provision, regulation, ruling, order, rule, or interpretation that allegedly has been violated.

§ 501.163 OFE evaluation.

(a) The record shall consist of the complaint and any supporting documents and all other relevant information developed in the course of any investigations or proceedings related to that complaint. OFE may investigate and corroborate any statement in the complaint or related documents submitted, and may utilize in its evaluation any relevant facts obtained by such investigation or from any other source of information. OFE may solicit or accept submissions from third persons relevant to the complaint or other related documents.

(b) Confidentiality of information. OFE will treat as confidential information received in any investigation of a complaint, including the identity of the complainant and the identity of any other persons who provide information to the extent such information is exempt from public disclosure under the Freedom of Information Act, 5 U.S.C. 552. OFE reserves the right to make disclosures that would be in the public interest.

§ 501.164 Decision to initiate enforcement proceedings.

After investigation of a specific complaint or based on any relevant information received or obtained during an investigation, OFE may issue a notice of violation, determine that no violation has occurred, or take such other actions as it deems appropriate. Prior to issuance of a notice of violation, and before commencement of an enforcement proceeding, OFE may transmit a draft of the notice of violation to the potentially affected person in order to promote an informal resolution of the violation.

§ 501.165 Commencement of enforcement proceedings.

(a) Whenever, on the basis of any information available, OFE determines that a person is in violation or about to be in violation of any provision of these regulations, OFE may issue a notice of violation stating, in writing and with reasonable specificity, the nature of the violation. An enforcement proceeding commences with the issuance of a notice of violation.

(b) Contents of the notice of violation. OFE will set forth in the notice of violation the nature of the violation, the relevant facts that OFE believes establish the violation and the legal basis for the conclusions reached therein. OFE may also include with the notice of violation a copy of a proposed order. The notice of violation will also state whether or not OFE proposes to assess civil penalties.

(1) If OFE proposes to assess a civil penalty, a notice of violation will be issued to the violator with an opportunity for a hearing before an Administrative Law Judge, as set forth in § 501.166(a)(1) of this part, before any final determination on the violation and penalty are made by OFE. The recipient of the notice will also be informed of his right to elect to have the procedures of § 501.166(a)(2) apply, in lieu of the hearing, with respect to a final determination on the assessment of any civil penalty.

(2) If OFE does not propose to assess a civil penalty, the violator will be provided the opportunity for a conference, as set forth in § 501.166(b), before a final determination on the violation is made by OFE. OFE may, in its discretion, also provide the violator an opportunity for a hearing pursuant to § 501.166(a)(1).

(c) Service. OFE will serve the notice of violation in accordance with provisions set forth in § 501.6.

(d) Rescission. If, after issuance of a notice of violation and any related investigation, OFE finds no basis for the belief that a violation has occurred, is continuing to occur, or is about to occur, OFE may rescind the notice of violation by giving written notice to that effect to the recipient.

§ 501.166 Hearings and conferences.

(a) When a civil penalty is proposed—(1) Hearing alternative in civil penalty assessment proceedings. Unless the recipient of a notice of violation elects in writing to have the provisions of paragraph (a)(2) of this section apply, OFE will commence a proceeding to assess a penalty and, prior to a final determination on the violation and assessment of a penalty, provide an opportunity for a hearing pursuant to 5 U.S.C. 554 before an Administrative Law Judge.

(2) Election alternative in civil penalty assessment proceedings. The recipient of a notice of violation in which a civil penalty assessment has been proposed may elect, in writing, within thirty (30) days of receipt of the notice, to waive the administrative proceedings described in paragraph (a)(1) of this section. OFE will make a determination on the proposed civil penalty assessment and issue a final order to that effect within forty-five (45) days after receiving notice of the exercise of this election.

(b) When a civil penalty is not proposed—opportunity to request a conference. If a person has received a notice of violation in which a civil penalty has not been proposed, he may, within thirty (30) days after receipt of the notice, request a conference with OFE to discuss the notice. In order to request a conference he must comply with the instructions set forth in the notice.

§ 501.167 Fuel use order.

(a) General. OFE will issue a Fuel Use Order if, after considering all the information received during the proceeding, OFE determines that a person has committed, is committing, or is about to commit a violation of FUA or of an order or rule thereunder.

(b) Contents. Any Fuel Use Order issued under this section shall set forth the relevant facts and legal basis for the order and where appropriate, the final penalty assessment and the basis therefor. When an administrative hearing is requested under § 501.166(a) of this part, the Fuel Use Order will include the recommended findings and conclusions of the Administrative Law Judge (ALJ) and the basis for the penalty assessment. OFE will make a final determination as to any penalty assessment or other appropriate remedy based upon the recommended findings and conclusions of the ALJ and other information in the record of the enforcement proceeding. The order will be effective upon service, unless otherwise provided therein, or stayed pursuant to § 501.120.

(c) Service. OFE will serve a copy of the Fuel Use Order upon any person who was served a copy of the notice of violation and upon all parties to any public proceeding on the notice of violation. OFE will place a copy of each final order on file in the Public Information Office described in § 501.12.

(d) Judicial review. Any person against whom a penalty is assessed pursuant to § 501.167(b) after a hearing before an ALJ may, within sixty (60) calendar days after the date of issuance of the order assessing such penalty, institute an action in the United States Court of Appeals for the appropriate judicial circuit for judicial review of such order in accordance with the provisions of section 723 of FUA.

Subpart L Investigations, Violations, Sanctions and Judicial Actions
§ 501.180 Investigations.

(a) General. Pursuant to section 711 of FUA, the DEOA, and in accordance with the provisions of 10 CFR 205.201, OFE may initiate and conduct investigations relating to the scope, nature, and extent of compliance by any person with the rules, regulations, and orders issued by OFE under the authority of the Act, or any order or decree of court relating thereto, or any other agency action. When the circumstances warrant, OFE may issue subpoenas as provided in subpart D of this part. OFE may also conduct investigative conferences in conjunction with any investigation.

(b) Any duly authorized representative of OFE has the authority to conduct an investigation and to take such action as he deems necessary and appropriate to the conduct of the investigation.

(c) Notification. If any person is required to furnish information or documentary evidence pursuant to a subpoena or special report order, OFE will, upon written request, inform that person as to the general purposes of the investigation.

(d) Confidentiality. OFE shall not disclose any information received during an investigation under this section, including the identities of the person investigated and any other person who provides information, to the extent it is exempt from public disclosure pursuant to 5 U.S.C. 552 and 10 CFR part 1004.

§ 501.181 Sanctions.

(a) General. (1) A violation of any provision of the Act (other than section 402 of FUA), or any rule or order thereunder shall be subject to the penalties and sanctions provided in subtitle C of title VII of FUA.

(2) Each day that any provision of the Act (other than section 402), or any rule or order thereunder is violated constitutes a separate violation within the meaning of the provisions of this section relating to civil penalties.

(b) Criminal penalties. Any person who willfully violates any provision of the Act (other than section 402), or any rule or order thereunder will be subject to a fine of not more than $50,000, or to imprisonment for not more than 1 year, or both, for each violation.

(c) Civil Penalties. (1) Any person who violates any provisions of the Act (other than section 402) or any rule in this subchapter or order under this subchapter or the Act will be subject to the following civil penalty, which may not exceed $117,608 for each violation: Any person who operates a powerplant or major fuel burning installation under an exemption, during any 12-calendar-month period, in excess of that authorized in such exemption will be assessed a civil penalty of up to $9 for each MCF of natural gas or up to $46 for each barrel of oil used in excess of that authorized in the exemption.

(2) OFE may compromise and settle, and collect civil penalties whenever it considers it to be appropriate or advisable.

(d) Corporate personnel. (1) If a director, officer, or agent of a corporation willfully authorizes, orders, or performs any act or practice constituting in whole or in part a violation of the Act, or any rule or order thereunder, he will be subject to the penalties specified in paragraphs (b) and (c) of this section without regard to any penalties to which the corporation may be subject. He will not, however, be subject to imprisonment under paragraph (b) of this section unless he knew of noncompliance by the corporation, or had received from OFE notice of noncompliance by the corporation.

(2) Purposes of this paragraph:

(i) Agent includes any employee or other person acting on behalf of the corporation on either a temporary or permanent basis; and

(ii) Notice of noncompliance is a final Fuel Use Order issued under § 501.167 of this part.

[46 FR 59889, Dec. 7, 1981, as amended at 62 FR 46183, Sept. 2, 1997; 74 FR 66032, Dec. 14, 2009; 81 FR 41794, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66083, Dec. 26, 2018; 85 FR 830, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2193, Jan. 13, 2023; 89 FR 1028, Jan. 9, 2024; 89 FR 105406, Dec. 27, 2024]

§ 501.182 Injunctions.

Whenever it appears to OFE that any person has committed, is committing, or is about to commit a violation of any provision of the Act, or any rule or order thereunder, OFE may, in accordance with section 724 of FUA, bring a civil action in the appropriate United States District Court to enjoin such acts or practices. The relief sought may include a mandatory injunction commanding any person to comply with any provision of such provision, order or rule, the violation of which is prohibited by section 724 of FUA and may also include interim equitable relief.

§ 501.183 Citizen suits.

(a) General. A person who believes he is aggrieved by the failure of OFE to perform any nondiscretionary act of duty under the Act may file a Petition for Action for OFE to take such action as he may feel to be proper. This petition must be filed at the address provided in § 501.11. The petition must specify the action requested and set forth the facts and legal arguments that constitute the basis for the request. The filing of a Petition for Action will serve as notice to OFE under FUA section 725(b) for purposes of any citizens suit that may be subsequently filed.

(b) OFE decision. Within sixty (60) days of receiving the Petition for Action, OFE will notify the person giving notice under this section that it has instituted the action requested or that other described action is being taken, or that other described action is being taken, or that no action is being taken and the reasons therefor.

Subpart M Use of Natural Gas or Petroleum for Emergency and Unanticipated Equipment Outage Purposes
§ 501.190 Purpose and scope.

(a) If a person operates a powerplant covered by any of the prohibitions of titles II, III, or IV of FUA, § 501.191 of this subpart establishes procedures to be followed for the use of minimum amounts of natural gas or petroleum under FUA section 103(a)(15)(B) in order to alleviate or prevent unanticipated equipment outages and emergencies directly affecting the public health, safety, or welfare that would result from electric power outages.

(b) Explanatory note: If a person operates a rental boiler as a powerplant covered by any of the prohibitions of titles II, III, or IV of FUA, he may be able to use the provisions of this subpart for the emergency use of natural gas or petroleum.

[54 FR 52893, Dec. 22, 1989]

§ 501.191 Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies defined in section 103(a)(15)(B) of the act.

(a) In the event of the occurrence or imminent occurrence of an emergency, or of the occurrence or imminent occurrence of an unanticipated equipment outage in the unit, an owner or operator of a powerplant is automatically permitted to use minimum amounts of natural gas or petroleum in the unit or in a substitute unit to prevent or alleviate the outage or to prevent or alleviate the emergency if he complies with procedures contained in paragraph (b) of this section.

(b) If the use of minimum amounts of petroleum or natural gas is required for purposes specified in this section, the owner or operator must notify OFE of such use by telegram or telephone within 24 hours after the commencement of such use. Immediately thereafter a written confirmation must be submitted to OFE, describing, to the best estimate of the owner or operator, (1) the nature of the emergency and (2) how long petroleum or natural gas use is likely to be required.

(c) For purposes of this section only:

(1) An emergency is the occurrence or threat of imminent occurrence of a condition which results or would result from an electric power outage and directly effects or would directly effect the public health, safety or welfare;

(2) Unanticipated equipment outage shall mean an unexpected outage due to equipment failure.

(3) Minimum amounts required to alleviate or prevent shall mean:

(i) For powerplants, the amounts of natural gas or petroleum required to prevent curtailment of electric supply where the operating utility has, to the maximum extent possible, utilized alternate fuel-fired capacity to prevent such curtailment. Note—A utility operating hydroelectric facilities may take into account seasonal fluctuations in storage capacity and shall be permitted to prevent depletion of stored power-producing capacity as deemed necessary by the utility; and

(ii) For installations, the amounts of natural gas or petroleum required to meet plant protection or human health and safety needs, including services to hospitals, public transportation facilities, sanitation, or water supply and pumping.

[46 FR 59889, Dec. 7, 1981, as amended at 54 FR 52893, Dec. 22, 1989]

§ 501.192 [Reserved]

PART 503 NEW FACILITIES

Authority: Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. § 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3289 (42 U.S.C. 8301 et seq.); Energy Security Act, Pub. L. 96-294, 94 Stat. 611 (42 U.S.C. 8701 et seq.); E.O. 1209, 42 FR 46267, September 15, 1977.

Source: 46 FR 59903, Dec. 7, 1981, unless otherwise noted.

Subpart A General Prohibition
§ 503.1 Purpose and scope.

This subpart sets forth the statutory prohibition imposed by the Act upon new powerplants. The prohibition in the subpart applies to all new baseload electric powerplants unless an exemption has been granted by OFE under subparts C and D of this part. Any person who owns, controls, rents, leases or operates a new powerplant that is subject to the prohibition may be subject to sanctions provided by the Act or these regulations.

[54 FR 52893, Dec. 22, 1989]

§ 503.2 Prohibition.

Section 201 of the Act prohibits, unless an exemption has been granted under subpart C or D of this part, any new electric powerplant from being constructed or operated as a baseload powerplant without the capability to use coal or another alternate fuel as a primary energy source.

[54 FR 52893, Dec. 22, 1989]

§ 503.3 [Reserved]
Subpart B General Requirements for Exemptions
§ 503.4 Purpose and scope.

This subpart establishes the general requirements necessary to qualify for either a temporary or permanent exemption under this part and sets out the methodology for calculating the cost of using an alternate fuel and the cost of using imported petroleum.

§ 503.5 Contents of petition.

Before OFE will accept a petition for either a temporary or permanent exemption under this part, the petition must include all of the evidence and information required in this part and part 501 of this chapter.

§ 503.6 Cost calculations for new powerplants and installations.

(a) General. (1) This calculation compares the cost of using alternate fuel to the cost of using imported petroleum. It must be performed for each alternate fuel and/or alternate site that the petitioner is required to examine.

(2) The cost of using an alternate fuel as a primary energy source will be deemed to substantially exceed the cost of using imported petroleum if the difference between the cost of using alternate fuel and the cost of using imported oil is greater than zero.

(3) There are two comparative cost calculations—a general cost test and a special cost test. Both take into consideration cash outlays for capital investments, annual expenses, and the effect of depreciation and taxes on cash flow. To demonstrate eligibility for a permanent exemption, a petitioner must use the procedures specified in the general cost test (paragraph (b) of this section). To demonstrate eligibility for a temporary exemption, the petitioner may apply the procedures specified in either the general cost test or the special cost test (paragraph (c) of this section).

(b) Cost calculation—general cost test. (1) A petitioner may be eligible for a permanent exemption if he can demonstrate that the cost of using an alternate fuel from the first year of operation substantially exceeds the cost of using imported petroleum. Unless the best practicable cost estimates as prescribed below will not materially change during the first ten years of operation of the unit (given the best information available at the time the petition is filed), the petitioner must also demonstrate that the cost of using an alternate fuel beginning at any time within the first ten years of operation and using imported petroleum or natural gas until such time (i.e., delayed use of alternate fuel) would substantially exceed the cost of using only imported petroleum.

(2) The petitioner would only be eligible for a temporary exemption if the computed costs of delayed alternate fuel use, commencing at the start of the second through eleventh years of operation, do not always substantially exceed the cost of using only imported petroleum. The length of the temporary exemption would be the minimum period from the start of operation in which the cost of using alternate fuel substantially exceeds the cost of using imported petroleum.

(3) To conduct the general cost test, calculate the difference (DELTA) between the cost of using an alternate fuel (COST(ALTERNATE)) and the cost of using imported petroleum (COST(OIL)) using Equations 1 through 3 below and the comparison procedures in paragraph (b)(5) of this section.

(4) The terms in Equations 2 and 3 are defined as follows:

i = Year. i is a specified year either before year 0 or after year 0. Year 0 is the year before the unit becomes operational. For example, in the third year before the unit becomes operational, i would equal −2, and in the third year following commencement of operations of the unit, i would equal + 3. Years are represented by 52 week periods prior to or following the date on which the unit becomes operational. Outlays before the unit becomes operational are future valued to the year before the unit becomes operational (year 0), and outlays after the unit becomes operational are present valued to the year before the unit becomes operational. Year 0 must be the same for the units being compared. g = The number of years prior to the year before the unit becomes operational (year 0) that (1) a cash outlay is first made for capital investments, or (2) an investment tax credit is first used—whichever occurs first. N = The useful life of the unit (see paragraph (d)(5) of this section). Ii = Yearly cash outlay (in dollars) from the year outlays first occur to the last year of the unit's useful life for capital investments. (See paragraph (d)(2) of this section for the items that must be included.) OMi = Annual cash outlay in year i (in dollars) for all operations and maintenance expenses except fuel (i.e., all non-capital and non-fuel cash outlays caused by putting the capital investments (I) into service). This may include labor, materials, insurance, taxes (except income taxes), etc. (See paragraph (d)(3) of this section.) Si = Salvage value of capital investment (in dollars) in year i. FLi = Annual cash outlay for delivered fuel expenses (in dollars) in year i. (See paragraph (d)(3) of this section for FLi calculation instructions and appendix II of these regulations for the procedures to determine fuel price.) k = The discount rate expressed as a fraction (see paragraph (d)(4) of this section). ITCi = Federal investment tax credit used in year i resulting from capital investments (see paragraph (d)(6) of this section). DPRi = Depreciation in year i resulting from capital investments (see paragraph (d)(6) of this section). ti = Marginal income tax rate in year i (see paragraph (d)(6) of this section). IXi = Inflation index value for year i (see appendix II to part 504 for method of computation). IXe = Inflation index value for the year e, the year before the asset is placed in service.

(5) The step-by-step procedure that follows shows the comparison that the petitioner must make.

(i) Compute the cost of using an alternate fuel (COST(ALTERNATE)) unit throughout the useful life of the unit using Equations 2 and 3.

(ii) Compute the cost of using oil or natural gas (COST(OIL)) throughout the useful life of the unit using Equations 2 and 3.

(iii) Using Equation 1, compute the difference (DELTA) between COST (ALTERNATE) and COST (OIL). If the difference (DELTA) is less than or equal to zero, a petitioner is not eligible for a permanent or temporary exemption using the general cost test and need not complete the remainder of the general cost test calculation. However, he still may be eligible for a temporary exemption using the special cost test (paragraph (c) of this section). If the difference (DELTA) is greater than zero and if the best practicable cost estimates will not materially change during the first ten years of operation (given the best information available at the time the petition is filed), the petitioner has completed the test and is eligible for a permanent exemption. However, if the best practicable cost estimate will materially change during the first ten years, the petitioner must complete the remainder of the general cost test—the delayed use calculations which follow.

(iv) Recompute COST (ALTERNATE) with Equations 2 and 3, assuming that an alternate fuel is not used as the primary energy source until the start of the second year of operation and that imported petroleum or natural gas is used for the first year of operation. All cash outlays should reflect postponed use of alternate fuel.

(v) Successively recompute COST (ALTERNATE) with Equations 2 and 3, assuming that the alternate fuel use is postponed until the start of the third year, fourth year, and so on, through the beginning of the eleventh year of operation (with imported petroleum or natural gas used in the years preceding alternate fuel use).

(vi) Compute the difference (DELTA) between each of the ten COST(ALTERNATE)s calculated in paragraph (b)(5) (iv) and (v) of this section and the COST(OIL) calculated in paragraph (b)(5)(ii) of this section.

(vii) If all the DELTAs computed in paragraph (b)(5) (iii) and (vi) of this section are greater than zero, the petitioner is eligible for a permanent exemption. If one or more of the DELTAs is less than or equal to zero, he is eligible for a temporary exemption for the period beginning at the start of the first year of operation and terminating at the beginning of the first year in which a DELTA is zero or less.

(c) Cost calculations—special cost test. (1) A petitioner may be eligible for a temporary exemption if he demonstrates that the cost of using an alternate fuel will substantially exceed the cost of using imported petroleum or (natural gas) over the period of the proposed exemption. The period of the proposed temporary exemption may not exceed ten years.

The petitioner must demonstrate that the cost of using an alternate fuel substantially exceeds the cost of using imported petroleum for the first year of operation, the first two years of operation, and so forth, through the period of the proposed exemption. OFE will limit the duration of a temporary exemption to the shortest time possible.

(2) To conduct the test, calculate the difference (DELTA) between the cost of using an alternate fuel (COST (ALTERNATE)) and the cost of using imported petroleum (COST (OIL)) using Equations 4 and 5 below, Equation 3 (paragraph (b)(3) of this section), and the comparison procedures in paragraph (c)(4) of this section.

Capital investment (I) is calculated with Equation 3 (paragraph (b)(3) of this section).

(3) The terms in Equation 5 are the same as those in Equation 2 with the addition of P, the length of the proposed temporary exemption in years. (See paragraph (b)(4) of this section for other terms.)

(4) The step-by-step procedure that follows shows the comparisons which must be made.

(i) Using Equation 5, compute the cost of using an alternate fuel (COST(ALTERNATE)) assuming the length of the proposed exemption is one year.

(ii) Likewise, compute the cost of using imported petroleum or natural gas (COST(OIL)) assuming the length of the proposed exemption is one year.

(iii) Compute the difference (DELTA) between COST (ALTERNATE) and COST (OIL) using Equation 4.

(iv) Repeat the calculations made in (i), (ii), and (iii) above, assuming the length of the proposed exemption is two years, three years, four years, and so on, up through the period of the proposed exemption.

(v) A petitioner is eligible for a temporary exemption for the period beginning at the start of the first year of operation and terminating at the beginning of the first year in which a DELTA is zero or less.

(d) Information on parameters used in the calculations. (1) All estimated expenditures, except fuel, shall be expressed in real terms (unadjusted for inflation) by using the prices in effect at the time the petition is submitted. Instructions for fuel price calculations are contained in appendix II.

(2) Capital investment yearly cash outlays (Ii) must include all items that are capital investments for Federal income tax purposes. All purchased equipment that has a useful life greater than one year, capitalized engineering costs, land, construction, environmental offsets, fuel inventory, transmission facilities, piping, etc., that are necessary for the operation of the unit must be included. However, an item must only be included if a cash outlay is required after the decision has been made to build the unit; sunk costs must not be included (e.g., if the firm owns the land, its purchase price may not be included).

Note:

The guidelines for the fuel inventory for powerplants not using natural gas shall be: (a) All powerplants with only steam driven turbines—78 days, (b) all powerplants with only combustion turbines—142 days, (c) all powerplants with combined cycles—both steam driven turbines and combustion turbines—142 days. The guidelines for the fuel inventory for installations not using natural gas shall be the greater of: (1) 21 days fuel supply, or (2) sufficient fuel to fill sixty (60) percent of the storage volume. The guidelines for the fuel inventory for all facilities using natural gas shall be zero unless the gas supply is interruptible in which case an appropriate inventory of back-up fuel must be included. Other inventory levels may be used if they are more appropriate than these guidelines; however, the source or derivation of these levels must be discussed in the evidential summary.

(3)(i) The annual cash outlays for operations and maintenance expense (OMi) and fuel expense (FLi) for a powerplant may be computed by one of the following three methods; however, the one chosen must be consistently applied throughout the analysis.

(A) Assume the energy produced by the powerplant equals seventy (70) percent of design capacity times 8760 hours for each year during the life of the powerplant, and compute cash outlays for operations, maintenance, and fuel expenses for the powerplant.

(B) Economically dispatch the new powerplant. The cash outlays for operations, maintenance, and fuel expenses of all powerplants being dispatched (where oil and natural gas are priced according to the procedures of appendix II 1) are the corresponding expenses for the purpose of the cost calculation. The dispatch analysis area must be that area with which the firm currently dispatches, anticipates dispatching, and will be interconnected. It must also include all anticipated exchanges of energy with other utilities or powerpools. The outlays for operations, maintenance, and fuel may also be estimated using a methodology that incorporates the benefits of economically dispatching units and provides consistent treatment in the alternate fuel and oil or natural gas cases being compared.

(C) Use a dispatch analysis to project the energy produced by the powerplant for a representative (not atypical) year of operation when consuming an alternate fuel. Compute the cash outlays for operations, maintenance, and fuel expenses for the powerplant based upon the level of energy production estimated for the representative year. The dispatch analysis and fuel expenses for the cost calculation must include oil and natural gas priced according to the procedures of appendix II. 1

(ii) When computing the annual cash outlays for operations and maintenance expense (OMi) and fuel expense (FLi) for an installation, specify the firing rates and the length of time each firing rate will be maintained.

(4) The discount rate (k) for analyses is 2.9 percent or that which is computed as specified in appendix I. The method of computing the inflation index (IX) is shown in appendix II to part 504. OFE will modify these specified rates from time to time as required by changed conditions after public notice and an opportunity to comment. However, the relevant set of specified rates for a specific petition for exemption will be the set in effect at the time the petition is submitted or the set in effect at the time a decision is rendered, whichever set is more favorable to the petitioner.

(5)(i) The guidelines for the useful life (N) of all powerplants except nuclear will be thirty-five (35) years. The guidelines for the useful life of a nuclear powerplant will be forty (40) years. The guidelines for the useful life of major fuel burning installations will be forty (40) years. Other useful life projections may be used if they are more appropriate than these guidelines; however, the source or derivation of these projections must be contained in the evidential summary. The summary should include a discussion of engineering, economic historical or other evidence.

(ii) If the units being compared have different useful lives, the petitioner will have to modify his calculation so that the two cash flows being compared have the length of the shorter useful life. To do this, (A) use the shorter of the two useful lives in Equations 2 and 5 for both units, and (B) multiply capital investment (I) of the unit with the longer life (computed with Equation 3) by the following adjustment factor (A):

where: R = The useful life of the facility with the longer life. Q = The useful life of the facility with the shorter life. k = The discount rate (see paragraph (d)(4) above).

(6) All Federal investment tax credits (ITCi) and depreciation (PRi) values are those used for Federal income tax purposes and must be applied consistently throughout the analysis and in a manner consistent with the Federal tax laws. All investment tax credits allowed under Federal tax law must be reflected in the computations. The petitioner must use the method of depreciation which results in the greatest present value of the cash flow due to the tax and depreciation effect. The marginal income tax rate (ti) is the firm's anticipated marginal Federal income tax rate in year i. The relevant investment tax credits, depreciation methodology, and marginal Federal income tax rates for a specific exemption petition will be those prescribed by Federal law in effect (or those tax parameters which are known with certainty will be in effect) at the time a decision is rendered. (However, if an investment tax credit expires in a certain year under the law which is in effect at the time the petition is submitted, the petitioner must assume that it will in fact expire in that year.)

(7) If powerplants are being compared, the design capacities or the maximum sustained energy per unit of time that could be produced must be the same. If installations are being compared, the maximum sustained energy per unit of time that could be produced must be the same.

(8) All estimated cash outlays must be computed in accordance with generally accepted accounting principles consistently applied.

(9) The scope of the estimates of relevant costs (as discussed above) of units being compared must be the same.

(10) All allowances for uncertainty and risk in the cost estimates must be explicit.

(11) All cash outlays must be net of any government subsidies or grants.

(e) Evidence in support of the cost calculation. Petitioners for an exemption which requires the use of the cost calculation shall certify that the cost of using alternate fuel substantially exceeds the cost of using oil as primary energy source as calculated in this section. A brief summary of the petitioner's supporting calculations and estimates shall be submitted with the certification. The summary should include the following:

(1) Cash outlays, Investment tax credits, depreciation methodologies, and anticipated salvage for capital investments including a description of all major construction and equipment;

(2) Annual cash outlays for operations and maintenance expenses including the formulas used to compute them; and

(3) Annual cash outlays for delivered fuel expenses including the formulas used to compute them.

[46 FR 59903, Dec. 7, 1981; 46 FR 63033, Dec. 30, 1981; 47 FR 15314, Apr. 9, 1982; 54 FR 52893, Dec. 22, 1989]

§ 503.7 State approval—general requirement for new powerplants.

(a) Where approvals by the appropriate State regulatory authority are required prior to the construction or use of a new powerplant, a petition for an exemption for consideration by OFE may be submitted to OFE prior to obtaining such approvals from the State regulatory authority.

(b) An exemption granted for a powerplant shall not become effective until an adequate demonstration has been made to OFE that all applicable approvals required by the State regulatory authorities have been obtained.

§ 503.8 No alternate power supply—general requirement for certain exemptions for new powerplants.

(a) Application. To qualify for an exemption, except in the case of an exemption for cogeneration units, section 213(c) of the Act requires a demonstration that, despite reasonable good faith efforts, there is no alternative supply of electric power available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service. If a petitioner is unable to demonstrate that there is no alternate supply during the first year of operation, OFE will conclude that the absence of the proposed powerplant will not impair short-term reliability of service, and as a result will not grant the exemption. Such action would not impair long-term reliability of service, since a petition may be submitted for a powerplant that would begin operation in a subsequent year.

(b) Criteria. To meet the demonstration required under paragraph (a) of this section, a petitioner must certify that:

(1) A diligent effort has been made to purchase firm power for the first year of operation to cover all or part of the projected shortfall at a cost that is less than ten (10) percent above the annualized cost of generating power from the proposed plant (including the capital, operation and maintenance expenses, and fuel prices); and

(2)(i) Despite these efforts, the reserve margin in the petitioner's electric region, normal dispatch area, or service area, in the absence of the proposed plant, would fall below twenty (20) percent during the first year of proposed operation; or

(ii) Despite these efforts, the reserve margin will be greater than twenty (20) percent but reliability of service would be impaired. In such case, the certification must be related to factors not included in the calculation of reserve margin, such as transmission constraints.

(c) Evidence. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certification required under paragraph (b) of this section; and

(2) Exhibits containing the basis for the certification submitted under this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support its certification to this general requirement).

(d) FERC consultation. OFE will forward a copy of any petition for which a showing is required under this section to FERC promptly after it is filed with OFE, and OFE will consult with FERC before making the no alternate supply of power finding.

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15314, Apr. 9, 1982; 54 FR 52894, Dec. 22, 1989]

§ 503.9 Use of mixtures—general requirement for certain permanent exemptions.

(a) Criteria. To qualify for a permanent exemption, except in the case of an exemption for fuel mixtures, section 213(a)(1) of the Act requires a demonstration that the use of a mixture of natural gas and petroleum and an alternate fuel for which an exemption under 10 CFR 503.38 (Fuel mixtures) would be available, would not be economically or technically feasible.

(b) Evidence. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications to the criteria set forth in paragraph (a) of this section; and

(2) Exhibits containing the basis for the certifications submitted under this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support its certifications to this general requirement.)

Note:

In meeting this general requirement, OFE will require a petitioner to examine only mixtures of oil and coal and natural gas and coal, or, where petitioner wishes to examine an additional or substitute mixture, such other alternate fuels as OFE and the petitioner agree are reasonable to petitioner's circumstances.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.10 Use of fluidized bed combustion not feasible—general requirement for permanent exemptions.

(a) OFE finding. Except in the case of an exemption for fuel mixtures, OFE may deny permanent exemptions authorized under section 212 of the Act if OFE finds on a site-specific or generic basis that use of a method of fluidized bed combustion of an alternate fuel is economically and technically feasible.

(b) Demonstration. If OFE has made such a finding, OFE will deny a petitioner's request for exemption unless the petitioner demonstrated that the use of a method of fluidized bed combustion is not economically or technically feasible. The petition or any supplement thereto required by OFE must include the following evidence:

(1) If use of a method of fluidized bed combustion were to be required, evidence that the petitioner would be eligible for a permanent exemption for lack of alternate fuel supply, site limitations, environmental requirements, lack of adequate capital, or State or local requirements; or

(2) Use of a method of fluidized bed combustion is not technically or economically feasible due to design or special circumstances.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.11 Alternative sites—general requirement for permanent exemptions for new powerplants.

(a) Criteria. To qualify for permanent exemption due to lack of alternate fuel supply, site limitations, environmental requirements, or inadequate capital, section 212(a) of the Act requires a demonstration that one of these exemptions would be available for any reasonable alternative site for the facility.

(b) Evidence. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications to the criteria set forth in paragraph (a) of this section; and

(2) Exhibits containing the basis for the certifications submitted under this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support its certifications to this general requirement).

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.12 Terms and conditions; compliance plans.

(a) Terms and conditions generally. A petitioner must comply with any terms and conditions imposed upon the grant of an exemption petition. OFE will limit any such terms and conditions to the unit(s) which is the subject of the petition.

(b) Compliance plans for temporary exemptions. (1) Any compliance plan required to accompany a petition for a temporary exemption shall include the following:

(i) A detailed schedule of progressive events and the dates upon which the events are to take place, indicating how compliance with the applicable prohibitions of the Act will occur;

(ii) Evidence of binding contracts for fuel, or for facilities for the production of fuel, which are required for compliance with the applicable prohibitions of the Act;

(iii) A schedule indicating how any necessary permits and approvals required to burn an alternate fuel will be obtained; and

(iv) Any other documentary evidence which indicates an ability to comply with the applicable prohibitions of the Act.

(2) Any exemption for which a compliance plan is required shall not be effective until the compliance plan is approved by DOE.

(3) If the petition is granted, an updated, duly executed plan must be submitted to OFE within one (1) month of an alteration of any milestone in the compliance plan, together with the reasons for the alteration and its impact upon the scheduling of all other milestones in the plan.

§ 503.13 Environmental impact analysis.

In order to enable OFE to comply with NEPA, a petitioner must include the information indicated in this section if a permanent exemption is requested. Material which has been prepared pursuant to any Federal, State or local requirement for environmental information for this unit or site may be incorporated by reference and appended to the petition. Guidelines issued by OFE for environmental reports should be used in preparing this analysis (44 FR 63740, November 5, 1979). These guidelines, which are also available in the OFE public document room, have been designed to insure that environmental reports follow the format prescribed by Council on Environmental Quality final regulations implementing NEPA. The guidelines are subject to discussion at a prepetition conference and to modification according to the facts of a particular case.

(a) All petitions for permanent exemptions must contain the following information:

(1) A description of the facility, including site location, and surroundings, alternative site(s), the facility's current proposed operations, its fuel capability, and its pollution abatement systems and equipment (including those systems and equipment necessary for all fuel scenarios considered);

(2) A description of the existing environment, including air, water, and land resources;

(3) Direct and indirect environmental impacts of the proposed action including impacts of alternative fuel scenarios, and no build alternatives.

(4) Regulatory requirements governing the facility, including a description of Federal, State and local requirements for air, water, noise and solid waste disposal which must be met for each fuel considered.

(b) For exemptions for cogeneration, the information enumerated below is to be submitted in lieu of the information required by paragraph (a) of this section. However, submission of the following information merely establishes a rebuttable presumption that the grant or denial of the exemption would have no significant environmental impact. OFE may, in individual cases, during the course of the administrative proceeding, determine that additional environmental information is required. In such cases, the petitioner will be required to submit the information described in paragraph (a) of this section.

(1) A certification that the petitioner will, prior to operating the unit under the exemption, secure all applicable environmental permits and approvals pursuant to, but not limited to, the following: Clean Air Act, Rivers and Harbors Act, Coastal Zone Management Act, Safe Drinking Water Act, Resource Conservation and Recovery Act; and

(2) Information required by the following environmental checklist must be provided and certified as accurate:

Environmental Checklist for FUA Certification Exemptions Instructions

All questions are to be answered by placing a check in the appropriate box. N/A represents (not applicable). Although it is not required, the petitioner may elaborate on any question in writing on a separate sheet of paper.

Yes | No | N/A

(1) Is your facility located in, or will it affect a wetland (Protection of Wetlands Executive Order No. 11990)?

(2) Is your facility located in, or will it affect, a 100-year floodplain (Floodplain Management Executive Order No. 11988)?

(3) Will your facility affect a designated wild, scenic, or recreation river (Wild and Scenic Rivers Act)?

(4)(A) Is your facility located within a county in which critical habitat for threatened or endangered species are known to exist (Endangered Species Act)?

(4)(B) Has a qualified biologist determined that your facility will not affect any species on the Threatened and Endangered Species list?

(5) Is your facility located on, or will it affect land that has been classified as prime or unique farmland or rangeland by the U.S. Department of Agriculture?

(6) Is your facility located on, or will it affect, historical archaeological, or cultural resources that have been designated pursuant to the National Historic Preservation Act?

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 51 FR 18866, May 22, 1986; 52 FR 658, Jan. 7, 1987; 54 FR 52894, Dec. 22, 1989]

§ 503.14 Fuels search.

Prior to submitting a petition for a permanent exemption for lack of alternate fuel supply, site limitations, inadequate capital, or state or local requirements, a petitioner must examine the use of conventional solid coal as a primary energy source at the site under consideration, and at reasonable alternative sites. Where a petitioner believes that its use of such coal would be infeasible, however, and where OFE and the petitioner can reach accord, it may evaluate use of a different alternate fuel in lieu of solid coal. A petitioner of these exemptions must demonstrate for any fuel examined that he would qualify for an exemption.

[54 FR 52894, Dec. 22, 1989]

Subpart C Temporary Exemptions for New Facilities
§ 503.20 Purpose and scope.

(a) This subpart implements the provisions contained in section 211 of the Act with regard to temporary exemptions for new facilities.

(b) This subpart establishes the criteria and standards which owners or operators of new powerplants who petition for a temporary exemption must meet to sustain their burden of proof under the Act.

(c) All petitions for temporary exemptions shall be submitted in accordance with the procedures set out in part 501 of this chapter and the applicable requirements of part 503 of these regulations.

(d) The duration of any temporary exemption granted under this subpart shall be measured from the date that the facility is placed in service using petroleum or natural gas.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.21 Lack of alternate fuel supply.

(a) Eligibility. Section 211(a)(1) of the Act provides for a temporary exemption due to the unavailability of an adequate and reliable supply of an alternate fuel at a cost which does not substantially exceed the cost of using imported petroleum. To qualify, a petitioner must certify that:

(1) A good faith effort has been to obtain an adequate and reliable supply of an alternate fuel of the quality necessary to conform to the design and operational requirements of the unit;

(2) For the period of the proposed exemption, the cost of using such alternate fuel would substantially exceed the cost of using imported petroleum as a primary energy source as defined in § 503.6 (Cost calculation) of these regulations;

(3) The petitioner will be able to comply with the applicable prohibitions of the Act at the end of the proposed exemption period; and

(4) No alternate power supply exists, as required under § 503.8 of these regulations.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) All data required by § 503.6 (cost calculation) of these regulations necessary for computing the cost calculation formula; and

(4) The anticipated duration of the lack of alternate fuel supply which constitutes the basis for the exemption.

(c) Duration. This temporary exemption, taking into account any extensions or renewals, may not exceed 10 years.

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 54 FR 52894, Dec. 22, 1989]

§ 503.22 Site limitations.

(a) Eligibility. Section 211(a)(2) of the Act provides for a temporary exemption due to a site limitation. To qualify for such an exemption, a petitioner must certify that:

(1) One or more specific physical limitations relevant to the location or operation of the proposed facility exist which, despite diligent good faith efforts, cannot be overcome before the end of the proposed exemption period;

(2) The petitioner will be able to comply with the applicable prohibitions of the Act at the end of the proposed exemption period; and

(3) No alternate power supply exists, as required under § 503.8 of these regulations.

Note:

Examples of the types of site limitations to which a petitioner may certify in order to qualify for this exemption include:

(i) Inaccessability of alternate fuels as a result of a specific physical limitation;

(ii) Unavailability of transportation facilities for alternate fuels;

(iii) Unavailability of adequate land or facilities for handling, using, or storing an alternate fuel;

(iv) Unavailability of adequate land or facilities for controlling and disposing of wastes, including pollution control equipment or devices necessary to assure compliance with applicable environmental requirements;

(v) Unavailability of adequate and reliable supply of water, including water for use in compliance with applicable environmental requirements; or

(vi) Other site limitations exist which will not permit the location or operation of the proposed unit using an alternate fuel.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption); and

(3) The anticipated duration of the site limitation which constitutes the basis for the exemption.

(c) Duration. This temporary exemption, taking into account any extensions and renewals, may not exceed five years.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.23 Inability to comply with applicable environmental requirements.

(a) Eligibility. Section 211(a)(3) of the Act provides for a temporary exemption due to an inability to comply with applicable environmental requirements. To qualify a petitioner must demonstrate that despite diligent good faith efforts:

(1) The petitioner will be unable, as of the projected date of commencement of operation, to comply with the applicable prohibitions of the Act without violating applicable Federal or State environmental requirements; and

(2) The petitioner will be able to comply with the applicable prohibitions of the Act and with applicable environmental requirements by the end of the temporary exemption period.

Note:

(1) For purposes of considering an exemption under this section, OFE's decision will be based solely on an analysis of the petitioner's capacity to physically achieve applicable environmental requirements. The petition should be directed toward those conditions or circumstances which make it physically impossible to comply during the temporary exemption period. The cost of compliance is not relevant, but cost-related considerations may be presented as part of a demonstration submitted under § 503.21.

(2) Prior to submitting an exemption petition, it is recommended that a meeting be requested with OFE and EPA or the appropriate State or local regulatory agency to discuss options for operating an alternate fuel fired facility in compliance with applicable environmental requirements.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Where the petitioner has applied for a construction permit from EPA or an appropriate State agency prior to petitioning for an exemption under this section, a copy of that application and synopsis of supporting documents filed with or subsequent to that application must be submitted to OFE with the petition or at the time filed with the permitting agency;

(2) To the extent applicable, a copy of the EPA or State denial of the construction permit application;

(3) To the extent applicable, a synopsis of the administrative record of the EPA or State or local permit proceedings;

(4) To the extent applicable, a summary of the technology upon which the denial was based, including a performance comparison between the proposed technology and that technology which would provide the maximum possible reduction of pollution;

(5) An examination of the environmental compliance of the facility, including an analysis of its ability to meet applicable standards and criteria when using both the proposed fuel and the alternate fuel(s) which would provide the basis for exemption. All such analysis must be based on accepted analytical techniques, such as air quality modeling, and reflect current conditions of the area which would be affected by the facility. The petitioner is responsible for obtaining the necessary data to accurately characterize these conditions. Environmental compliance must be examined in the context of available pollution control equipment which would provide the maximum possible reduction of pollution. The analysis must contain: (i) Requests for bids and other inquiries made and responses received by the petitioner concerning the availability and performance of pollution control equipment; (ii) contracts signed, if any, for an alternate fuel supply and for the purchase and installation of pollution control equipment; or (iii) other comparable evidence such as technical studies documenting the efficacy of equipment to meet applicable requirements;

(6) An examination of any regulatory options available to the petitioner in seeking to achieve environmental compliance (such as offsets, variances, and State Implementation Plan revisions);

(7) Any other documentation which demonstrates an inability to comply with applicable environmental requirements;

(8) No alternate power supply exists, as required under § 503.8 of these regulations.

(c) Duration. This temporary exemption, taking into account any extension and renewals, may not exceed 5 years.

(d) Certification alternative. (1) To qualify for this exemption, in lieu of meeting the evidentiary requirements of paragraph (b) of this chapter, a petitioner may certify that, for the period of the exemption:

(i) The site for the facility is or will be located in a Class I area or Class II area in which the allowable increment established by law has been consumed, as defined in part C of the Clean Air Act; the use of an alternate fuel will cause or contribute to concentrations of pollutants which would exceed the maximum allowable increases in a Class I or Class II area even with the application of best available control technology; the site for the facility is or will be located in a non-attainment area as defined in part D of the Clean Air Act for any pollutant which would be emitted by the facility; or, even with the application of the lowest achievable emission rate, the use of an alternate fuel will cause or contribute to concentrations in an air quality control region, of a pollutant for which any national ambient air quality standard is or would be exceeded; and

(ii) No alternate power supply exists, as required under § 503.8 of these regulations.

(2) A petition by certification under this paragraph must include:

(i) Duly executed certifications required under paragraph (d)(1) of this section;

(ii) Exhibits containing the basis for the certifications required under paragraph (d)(1) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption); and

(iii) The anticipated duration of the circumstances which constitute the basis for the exemption.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

§ 503.24 Future use of synthetic fuels.

(a) Eligibility. Section 211(b) of the Act provides for a temporary exemption based upon the future use of synthetic fuels. To qualify, a petitioner must certify that:

(1) The petitioner will be able to comply with the applicable prohibitions imposed by the Act by the use of a synthetic fuel derived from coal or another alternate fuel as a primary energy source in the proposed facility by the end of the proposed exemption period;

(2) The petitioner will not be able to comply with the applicable prohibitions imposed by the Act by use of a synthetic fuel until the end of the proposed exemption period; and

(3) No alternate power supply exists, as required under § 503.8 of these regulations.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption); and

(3) A preliminary compliance plan, including to the extent available, the information required under § 503.12.

(c) Final Compliance Plan. Before an exemption may become effective, the petitioner must submit and OFE must approve a final compliance plan as required by § 503.12.

(d) Duration. This temporary exemption may be granted for a period of up to ten (10) years. Unless the petitioner requests otherwise, any temporary exemption from the fuel use prohibitions of the Act for the future use of synthetic fuels will commence on the date of commercial operation of the facility.

Note:

Contracts based on the anticipated successful demonstration of a development program and/or the anticipated economic feasibility of a synthetic fuels facility, will generally be sufficient to meet the “binding contract” requirements for this exemption.

[46 FR 59903, Dec. 7, 1981; 47 FR 15315, Apr. 9, 1982; 54 FR 52894, Dec. 22, 1989]

§ 503.25 Public interest.

(a) Eligibility. Section 211(c) of the Act provides for a temporary public interest exemption. To qualify, a petitioner must demonstrate that:

(1) The unit will be capable of complying with the applicable prohibitions at the end of the proposed exemption period;

(2) The granting of the exemption would be in accord with the purposes of the Act and would be in the public interest; and

(3) No alternate power supply exists, as required under § 503.8 of these regulations.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Substantial evidence to corroborate the eligibility requirements identified above; and

(2) The anticipated duration of the circumstances which constitute the basis for the exemption.

(c) Certification alternative. If the petitioner requires use of oil or natural gas in a unit, during the construction of an alternate-fuel fired unit, the petitioner may substitute, in lieu of the evidentiary requirements of paragraphs (b)(1) and (2) of this section:

(1) A duly executed certification, including the requested duration of the exemption, that the unit will be operated on oil or natural gas only during the construction of an alternate fuel fired unit to be owned or operated by the petitioner; and

(2) Exhibits containing the basis for the certifications required under paragraph (c)(1) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption).

(d) Duration. This temporary exemption, taking into account extension and renewals, may not exceed 5 years.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52894, Dec. 22, 1989]

Subpart D Permanent Exemptions for New Facilities
§ 503.30 Purpose and scope.

(a) This subpart implements the provisions contained in section 212 of the Act with regard to permanent exemptions for new facilities.

(b) This subpart establishes the criteria and standards which owners or operators of new powerplants and installations who petition for a permanent exemption must meet to sustain their burden of proof under the Act.

(c) All petitions for permanent exemptions for new facilities shall be submitted in accordance with the procedures set out in part 501 of this chapter and the applicable requirements of part 503 of these regulations.

§ 503.31 Lack of alternate fuel supply for the first 10 years of useful life.

(a) Eligibility. Section 212(a)(1)(A)(i) of the Act provides for a permanent exemption due to lack of an adequate and reliable supply of alternate fuel within the first 10 years of useful life of the proposed unit. To qualify, a petitioner must certify that:

(1) A good faith effort has been made to obtain an adequate and reliable supply of an alternate fuel for use as a primary energy source of the quality and quantity necessary to conform with the design and operational requirements of the unit;

(2) Such a supply is not likely to be available within the first 10 years of useful life of the proposed unit;

(3) No alternate power supply exists, as required under § 503.8 of these regulations;

(4) Use of mixtures is not feasible, as required under § 503.9 of these regulations; and

(5) Alternative sites are not available, as required under § 503.11 of these regulations.

(b) Evidence required in support of a petition. A petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) Environmental impact analysis, as required under § 503.13 of these regulations; and

(4) Fuels search, as required under § 503.14 of these regulations.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52895, Dec. 22, 1989]

§ 503.32 Lack of alternate fuel supply at a cost which does not substantially exceed the cost of using imported petroleum.

(a) Eligibility. Section 212(a)(1) (A)(ii) of the Act provides for a permanent exemption due to lack of an alternate fuel supply at a cost which does not substantially exceed the cost of using imported petroleum. To qualify a petitioner must certify that:

(1) A good faith effort has been made to obtain an adequate and reliable supply of an alternate fuel for use as a primary energy source of the quality and quantity necessary to conform with the design and operational requirements of the proposed unit;

(2) The cost of using such a supply would substantially exceed the cost of using imported petroleum as a primary energy source during the useful life of the proposed unit as defined in § 503.6 (cost calculation) of these regulations;

(3) No alternate power supply exists, as required under § 503.8 of these regulations.

(4) Use of mixtures is not feasible, as required under § 503.9 of these regulations; and

(5) Alternative sites are not available, as required under § 503.11 of these regulations.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) Environmental impact analysis, as required under § 503.13 of these regulations;

(4) Fuels search, as required under § 503.14 of these regulations; and

(5) All data required by § 503.6 (cost calculation) of these regulations necessary for computing the cost calculation formula.

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 54 FR 52895, Dec. 22, 1989]

§ 503.33 Site limitations.

(a) Eligibility. Section 212(a)(1)(B) of the Act provides for a permanent exemption due to site limitations. To qualify for such an exemption, a petitioner must certify that:

(1) One or more specific physical limitations relevant to the location or operation of the proposed facility exist which, despite good faith efforts, cannot reasonably be expected to be overcome within five years after commencement of operations;

(2) No alternate power supply exists, as required under § 503.8 of these regulations;

(3) Use of mixtures is not feasible, as required under § 503.9 of these regulations; and

(4) Alternative sites are not available, as required under § 503.11 of these regulations.

Note:

Examples of the types of site limitations to which a petitioner may certify in order to qualify for this exemption include:

(i) Inaccessibility of alternate fuels as a result of a specific physical limitation;

(ii) Unavailability of transportation facilities for alternate fuels;

(iii) Unavailability of adequate land or facilities for handling, using or storing an alternate fuel;

(iv) Unavailability of adequate land or facilities for controlling and disposing of wastes, including pollution control equipment or devices necessary to assure compliance with applicable environmental requirements;

(v) Unavailability of adequate and reliable supply of water, including water for use in compliance with applicable environmental requirements; or

(vi) Other site limitations exist which will not permit the location or operation of the proposed unit using an alternate fuel.

(b) Evidence required in support of the petition. A petitioner must include in the petition the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) Environmental impact analysis, as required under § 503.13 of these regulations; and

(4) Fuels search, as required under § 503.14 of these regulations.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52895, Dec. 22, 1989]

§ 503.34 Inability to comply with applicable environmental requirements.

(a) Eligibility. Section 212(a)(1)(C) of the Act provides for a permanent exemption due to the inability to comply with applicable environmental requirements. To qualify, a petitioner must demonstrate that despite good faith efforts:

(1) The petitioner will be unable within 5 years after beginning operation, to comply with the applicable prohibitions imposed by the Act without violating applicable Federal or state environmental requirements; and

(2) Reasonable alternative sites, which would permit the use of alternate fuels in compliance with applicable Federal or state environmental requirements, are not available.

Note:

(1) For purposes of considering an exemption under this section, OFE's decision will be based solely on an analysis of the petitioner's capacity to physically achieve applicable environmental requirements. The cost of compliance is not relevant, but cost-related considerations may be presented as part of a demonstration submitted under § 503.32 (Lack of alternate fuel supply).

(2) Prior to deciding to submit an exemption petition, it is recommended that a petitioner request a meeting with OFE and EPA or the appropriate state or local regulatory agency to discuss options for operating an alternate fuel-fired facility in compliance with the applicable environmental requirements.

(b) [Reserved]

(c) Evidence required in support of a petition. The petitioner must include in the petition the following evidence in order to make the demonstration required by this section:

(1) Where the petitioner has applied for a construction permit from EPA or an appropriate state agency prior to petitioning for an exemption from OFE under this section, a copy of such application and a synopsis of all supporting documents filed with or subsequent to the application must be submitted to OFE with the petition or at the time filed with the permitting agency;

(2) To the extent applicable, a copy of the EPA or state denial of the construction permit application;

(3) To the extent applicable, a synopsis of the administrative record of the EPA or state or local permit proceedings;

(4) To the extent applicable, a summary of the technology upon which the denial was based, including a performance comparison between the proposed technology and that technology which provides the maximum possible reduction of pollution;

(5) An examination of the environmental compliance of the facility, including an analysis of its ability to meet applicable standards and criteria when using both the proposed fuel and the alternate fuel(s) which would provide the basis for the exemption. All such analysis must be based on accepted analytical techniques, such as air quality modeling, and reflect current conditions of the area which would be affected by the facility. The petitioner is responsible for obtaining the necessary data to accurately characterize these conditions. Environmental compliance must be examined in the context of available pollution control equipment which would provide the maximum possible reduction of pollution. The analysis must contain: (i) Requests for bids and other inquiries made and responses received by the petitioner concerning the availability and performance of pollution control equipment; or (ii) other comparable evidence such as technical studies documenting the efficacy of equipment to meet applicable requirements;

(6) An examination of any regulatory options available to the petitioner in seeking to achieve environmental compliance (such as offsets, variances and State Implementation Plan (SIP) revisions); and

(7) Any other documentation which demonstrates an inability to comply with applicable environmental requirements;

(8) No alternate power supply exists as required under § 503.8 of these regulations;

(9) Use of mixtures is not feasible, as required under § 503.9 of these regulations;

(10) Alternative sites are not available, as required under § 503.11 of these regulations;

(11) Environmental impact analysis, as required under § 503.13 of these regulations; and

(12) Fuels search, as required under § 503.14 of these regulations.

(d) Certification alternative. (1) To qualify for this exemption, in lieu of meeting the evidentiary requirements of paragraph (c) of this section, a petitioner may certify that:

(i) The site for the facility is or will be located in a Class I area or Class II area in which the allowable increment established by law has been consumed, as defined in part C of the Clean Air Act; the use of an alternate fuel will cause or contribute to concentrations of pollutants which would exceed the maximum allowable increases in a Class I or Class II area even with the application of best available control technology; the site for the facility is or will be located in a non-attainment area as defined in part D of the Clean Air Act for any pollutant which would be emitted by the facility; or, even with the application of the lowest achievable emission rate, the use of an alternate fuel will cause or contribute to concentrations in an air quality control region of a pollutant for which any national ambient air quality standard is or would be exceeded;

(ii) No alternate power supply exists, as required under § 503.8 of these regulations;

(iii) Alternative sites are not available, as required under § 503.11 of these regulations; and

(iv) Use of mixtures is not feasible, as required under § 503.19 of these regulations.

(2) A petition by certification under this paragraph must include:

(i) Duly executed certifications required under paragraph (d)(1) of this section;

(ii) Exhibits containing the basis for the certifications required under paragraph (d)(1) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(iii) Environmental impact analysis, as required under § 503.13 of these regulations; and

(iv) Fuels search, as required under § 503.14 of these regulations.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52895, Dec. 22, 1989]

§ 503.35 Inability to obtain adequate capital.

(a) Eligibility. Section 212(a)(1)(D) of the Act provides for a permanent exemption due to inability to obtain adequate capital. To qualify, a petitioner must certify that:

(1) Despite good faith efforts the petitioner will be unable to comply with the applicable prohibitions imposed by the Act because the additional capital required for an alternate fuel-capable unit beyond that required for the proposed unit cannot be raised;

(2) The additional capital cannot be raised:

(i) Due to specific restrictions (e.g., convenants on existing bonds) which constrain management's ability to raise debt or equity capital;

(ii) Without a substantial dilution of shareholder equity;

(iii) Without an unreasonably adverse affect on the utility's credit rating; or

(iv) In the case of non-investor-owned public utilities, without jeopardizing the utility's ability to recover its capital investment, through tariffs, without unreasonably adverse economic effect on its service area (such as adverse impacts on local industry or undue hardship to ratepayers).

(3) No alternative power supply exists, as required under § 503.8 of these regulations;

(4) Use of mixtures is not feasible, as required under § 503.9 of these regulations; and

(5) Alternative sites are not available, as required under § 503.11 of these regulations.

(b) Evidence required in support of a petition. A petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) Environmental impact analysis, as required under § 503.13 of these regulations; and

(4) Fuels search, as required under § 503.14 of these regulations.

[46 FR 59903, Dec. 7, 1981, as amended at 47 FR 15315, Apr. 9, 1982; 54 FR 52895, Dec. 22, 1989]

§ 503.36 State or local requirements.

(a) Eligibility. Section 212(b) of the Act provides for an exemption due to certain State or local requirements. To qualify a petitioner must certify that:

(1) With respect to the proposed site of the unit, the operation or construction of the new unit using an alternate fuel is infeasible because of a State of local requirement other than a building code, nuisance, or zoning law;

(2) The petitioner has made a good faith effort to obtain a variance from the State or local requirement but has been unable to do so or has demonstrated why none is available;

(3) The granting of the exemption would be in the public interest and would be consistent with the purposes of the Act;

(4) The petitioner is not entitled to an exemption for lack of alternate fuel supply, site limitation, environmental requirements, or inability to obtain adequate capital at the site of the proposed powerplant or at any reasonable alternative site for the alternate fuel(s) considered;

(5) At the proposed site and every reasonable alternative site where the petitioner is not entitled to an exemption for lack of alternate fuel supply, site limitation, environmental requirements, or inability to obtain adequate capital, the petitioner nevertheless would be barred at each such proposed or alternate site from burning an alternate fuel by reason of a State or local requirement;

(6) No alternate power supply exists, as required under § 503.8 of these regulations; and

(7) Use of mixtures is not feasible, as required under § 503.9 of these regulations.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) Environmental impact analysis, as required under § 503.13 of these regulations; and

(4) Fuels search, as required under § 503.14 of these regulations.

[46 FR 59903, Dec. 7, 1981; 46 FR 63033, Dec. 30, 1981, as amended at 54 FR 52895, Dec. 22, 1989]

§ 503.37 Cogeneration.

The following table may be used to determine eligibility for a permanent exemption based on oil and natural gas savings.

Average Annual Utilization of Oil and Natural Gas for Electricity Generation by State

[BTU's per KWHR sold]

State name | Oil/gas savings Btu/kWh

Alabama | 33

Arizona | 802

Arkansas | 1,363

California | 3,502

Colorado | 289

Connecticut | 3,924

Delaware | 3,478

Washington, DC. | 895

Florida | 3,177

Georgia | 45

Idaho | 0

Illinois | 250

Indiana | 53

Iowa | 147

Kansas | 686

Kentucky | 34

Louisiana | 4,189

Maine | 2,560

Maryland | 895

Massachusetts | 5,250

Michigan | 256

Minnesota | 151

Mississippi | 1,519

Missouri | 57

Montana | 60

Nebraska | 139

Nevada | 761

New Hampshire | 2,695

New Jersey | 1,894

New Mexico | 1,528

New York | 4,219

North Carolina | 49

North Dakota | 47

Ohio | 36

Oklahoma | 5,180

Oregon | 0

Pennsylvania | 771

Rhode Island | 1,800

South Carolina | 24

South Dakota | 36

Tennessee | 20

Texas | 4,899

Utah | 107

Vermont | 105

Virginia | 460

Washington | 3

West Virginia | 126

Wisconsin | 72

Wyoming | 75

Data are based upon 1987 oil, natural gas and electricity statistics published by DOE's Energy Information Administration.

Example:The proposed cogeneration project is to be located in Massachusetts and is to use distillate oil. It will have a capacity of 50 MW, an average annual heat rate of 7600 BTU/KWHR, and be operated at a capacity factor of 90%. The annual fuel consumption is therefore calculated to be 2,996 × 10 9 Btu/yr. (50,000 KW × 7600 BTU/KWHR × .9 × 8760 HR/YR) The oil and gas backed off the grid would be calculated to be .2070 × 10 9 BTU/YR. (50,000 KW × 5250 BTU/KWHR × .9 × 8760 HR/YR) since the proposed unit would consume more oil that would be “backed off” the grid, the unit would not be eligible for a permanent exemption based on savings of oil and natural gas.

[54 FR 52895, Dec. 22, 1989]

§ 503.38 Permanent exemption for certain fuel mixtures containing natural gas or petroleum.

(a) Eligibility. Section 212(d) of the Act provides for a permanent exemption for certain fuel mixtures. To qualify a petitioner must certify that:

(1) The petitioner proposes to use a mixture of natural gas or petroleum and an alternate fuel as a primary energy source;

(2) The amount of petroleum or natural gas proposed to be used in the mixture will not exceed the minimum percentage of the total annual Btu heat input of the primary energy sources needed to maintain operational reliability of the unit consistent with maintaining a reasonable level of fuel efficiency; and

(3) No alternate power supply exists, as required under § 503.8 of these regulations.

(b) Evidence required in support of a petition. The petition must include the following evidence in order to make the demonstration required by this section:

(1) Duly executed certifications required under paragraph (a) of this section;

(2) Exhibits containing the basis for the certifications required under paragraph (a) of this section (including those factual and analytical materials deemed by the petitioner to be sufficient to support the granting of this exemption);

(3) A description of the fuel mixture, including component fuels and the percentage of each such fuel to be used; and

(4) Environmental impact analysis as required under § 503.13 of these regulations.

(c) Solar mixtures. OFE will grant a permanent mixtures exemption for the use of a mixture of solar energy (including wind, tide, and other intermittent sources) and petroleum or natural gas, where:

(1) Solar energy will account for at least 20 percent of the total annual Btu heat input, of the primary energy sources of the unit; and

(2) Petitioner meets the eligibility and evidentiary requirements of paragraphs (a) and (c) of this section.

[46 FR 59903, Dec. 7, 1981, as amended at 54 FR 52896, Dec. 22, 1989]

§§ 503.39-503.44 [Reserved]

PART 504 EXISTING POWERPLANTS

Authority: Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. § 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3289 (42 U.S.C. 8301 et seq.); Energy Security Act, Pub. L. 96-294, 94 Stat. 611 (42 U.S.C. 8701 et seq.); E.O. 1209, 42 FR 46267, Sept. 15, 1977.

Source: 45 FR 53692, Aug. 12, 1980, unless otherwise noted.

§ 504.2 Purpose and scope.

(a) Sections 504.5, 504.6, and 504.8, set forth the prohibitions that OFP, pursuant to section 301 of the Act, as amended, may impose upon existing powerplants after a review of the certification and prohibition order compliance schedule submitted by the owner or operator of a powerplant. Sections 504.5 and 504.8 are explanatory sections, and § 504.6 provides the informational requirements necessary to support the certification.

(b) Sections 504.6 and 504.7, set forth the prohibitions that OFP may impose upon certain electing powerplants, pursuant to former section 301 (b) and (c) of FUA, where OFP can make the findings as to the unit's technical capability and financial feasibility to use coal or another alternate fuel as a primary energy source. The prohibitions may be made to apply to electing powerplants unless an exemption is granted by OFP under the provisions of the Final Rule for Existing Facilities (10 CFR parts 500, 501 and 504) published at 45 FR 53682, Aug. 12, 1980 and 46 FR 59872, Dec. 7, 1981. Any person who owns, controls, rents or leases an existing electing powerplant may be subject to the prohibitions imposed by and the sanctions provided for in the Act or these regulations, if OFP can make the findings required by former section 301 (b) and (c) of FUA.

(Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35; E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[47 FR 50849, Nov. 10, 1982]

§§ 504.3-504.4 [Reserved]
§ 504.5 Prohibitions by order (certifying powerplants under section 301 of FUA, as amended).

(a) In the case of existing powerplants, OFP may prohibit, in accordance with section 301 of the Act, as amended, the use of petroleum or natural gas as a primary energy source where the owner or operator of the powerplant presents a complete certification concurred in by OFP. The certification, which may be presented at any time, pertains to the unit's technical capability and financial feasibility to use coal or another alternate fuel as a primary energy source in the unit. The informational requirements necessary to support a certification are contained in § 504.6 of these regulations. A prohibition compliance schedule which meets the requirements of § 504.5(d) shall also be submitted.

(b) If OFP concurs with the certification, a prohibition order on the powerplant's use of petroleum or natural gas will be issued following the procedure outlined in § 501.52 of these regulations.

(c) The petitioner may amend its certification at any time prior to the effective date of the prohibitions contained in the final prohibition order in order to take into account changes in relevant facts and circumstances by following the procedure contained in § 501.52(d).

(d) Prohibition order compliance schedule. The certification described above, which forms the basis for the issuance of a prohibition order to a powerplant, shall include a prohibition order compliance schedule. The compliance schedule should contain the following:

(1) A schedule of progressive events involved in the conversion project, including construction of any facilities for the production of fuel or fuel handling equipment, and contracts for the purchase of alternate fuels, and estimated date of compliance with the applicable prohibitions of the Act; and

(2) A schedule indicating estimated dates for obtaining necessary federal, state, and local permits and approvals. Any prohibition order issued under the certification provisions of §§ 504.5, 504.6, and 504.8 will be subject to appropriate conditions subsequent so as to delay the effectiveness of the prohibitions contained in the final prohibition order until the above events or permits have occurred or been obtained.

(Approved by the Office of Management and Budget under control number 1903-0077)

(Department of Energy Organization Act, Pub. L. 95-91 (42 U.S.C. 7101 et seq.); Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620 (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35)

[47 FR 17044, Apr. 21, 1982]

§ 504.6 Prohibitions by order (case-by-case).

(a) OFP may prohibit, by order, the use of natural gas or petroleum as a primary energy source in existing powerplants under certain circumstances. In the case of certifying powerplants under section 301 of the Act, as amended, the petitioner must present evidence to support the certification, required by § 504.6 (c), (d), (e), and (f). In the case of electing powerplants, OFP must make the following findings required by § 504.6 (c), (d), (e), and (f), in order to issue a prohibition order to the unit, pursuant to former section 301 (b) or (c):

(1) The unit currently has, or previously had, the technical capability to use an alternate fuel as a primary energy source;

(2) The unit has this technical capability now, or it could have the technical capability without:

(i) A substantial physical modification of the unit; or

(ii) A substantial reduction in the rated capacity of the unit; and

(3) It is financially feasible for the unit to use an alternate fuel as its primary energy source.

(b) In the case of electing powerplants, OFP must make a proposed finding regarding the technical capability of a unit to use alternate fuel as identified in paragraph (a) (1) of this section prior to the date of publication of the notice of the proposed prohibition. OFP will publish this finding in The Federal Register along with the notice of the proposed prohibition.

(c) Technical capability. (1) In the case of electing and certifying powerplants, OFP will consider “technical capability” on a case-by-case basis in order to make the required finding. In the case of a certifying powerplant, the powerplant should present information to support the certification relevant to the considerations set forth below. OFP will consider the ability of the unit, from the point of fuel intake to physically sustain combustion of a given fuel and to maintain heat transfer. 2

2 OFP will not ordinarily consider the nature or absence of appurtenances outside the unit. For example, OFP will examine the furnace configuration and ash removal capability but will not normally consider the need to install pollution control equipment as a measure of technical capability. Furthermore, OFP will not normally conclude that the absence of fuel handling equipment, such as conveyor belts, pulverizers, or unloading facilities, bears on the issue of a unit's “technical capability” to burn an alternate fuel.

(2) OFP considers that a unit “had” the technical capability to use an alternate fuel if the unit was once able to burn that fuel (regardless of whether the unit was expressly designed to burn that fuel or whether it ever actually did burn it), but is no longer able to do so at the present due to temporary or permanent alterations to the unit itself. 3

3 For example, a unit which at one time burned solid coal but which could no longer do so because its coal firing ports and sluicing channels had been cemented over, would be classified as having “had” the technical capability to use coal. (The question of whether it again “could have” such capability without “substantial physical modification” is a separate and additional question.)

(3) A unit “has” the technical capability to use an alternate fuel if it can burn an alternate fuel, notwithstanding the fact that adjustments must be made to the unit beforehand or that pollution control equipment may be required to meet air quality requirements. 4

4 A unit designed to burn natural gas shall be presumed to have the technical capability to burn a synthetic fuel such as medium Btu gas from coal (assuming such gas is available unless convincing evidence to the contrary is submitted in rebuttal). Also a unit designed to burn oil may, depending upon the chemical characteristics, be a unit that “has” the technical capability to burn liquefied coal. The fact that certain adjustments may be necessary does not render this a “hypothetical” as opposed to a “real” capability. Even an oil fired unit converting from the use of #2 distillate to #6 residual oil may be required to adjust or replace burner nozzles and add soot blowers.

(d) Substantial physical modification. In the case of electing and certifying powerplants, OFP will make its determination on whether a physical modification to a unit is “substantial” on a case-by-case basis. In the case of certifying powerplants, OFP will consider the factors set forth below for the purpose of concurrence in the certification. OFP will consider physical modifications made to the unit as “substantial” where warranted by the magnitude and complexity of the engineering task or where the modification would impact severely upon operations at the site. 5 OFP will not, however, assess physical modification on the basis of cost.

5 Generally, modification of a unit to burn coal or an alternate fuel will be considered insubstantial if significant alterations to the boiler, such as a change to the furnace configuration or a complete respacing of the tubes, are not required. Minor alterations such as replacement of burners or additions of soot blowers, and additions or alterations outside the boiler, shall not cause the modification to be substantial.

(e) Substantial reduction in rated capacity. In the case of electing and certifying powerplants, OFP will make this determination on the basis of the following factors. A certifying powerplant should present information to support its certification regarding these factors in order for OFP to make its review for concurrence.

(1) OFP regards a unit's derating of 25 percent or more, as a result of converting a unit from oil or gas to an alternate fuel, as substantial.

(2) OFP will presume that a derating of less than 10 percent, as a result of converting a unit from oil or gas to an alternate fuel, is not substantial unless convincing evidence to the contrary is submitted in rebuttal. 6

6 For example, units that are the subject of a prohibition order will not have installed any operating air pollution control equipment sufficient to burn coal in compliance with applicable environmental equipments. The installation and use of air pollution control equipment alone can, in many cases, produce a derating. Moreover, the shift to coal itself will, because of differences in energy density and fuel flow characteristics, typically involve some derating.

(3) OFP will assess units for which a derating is claimed of 10 percent or more, but less than 25 percent, on a case-by-case.

(4) In assessing whether a unit's derating is not substantial, OFP will consider the impact of a reduction in rated capacity of the unit taking into consideration all necessary appurtenances such as air pollution control equipment required to burn an alternate fuel in compliance with environmental requirements expected to be applicable at the date the prohibitions contained in the final prohibition order become effective. However, the potential order recipient may raise in rebuttal the impact of derating on the site at which the unit is located and on the system as well as on the unit itself, if under paragraph (e)(2), or case-by-case, if under paragraph (e)(3) of this section.

(f) Financial feasibility. In the case of certifying and electing powerplants, OFP will make this finding based on the following considerations. A certifying powerplant should present information to support its certification relevant to these considerations in order for OFP to make its review for concurrence. Conversion of a unit to burn coal or an alternate fuel shall be deemed financially feasible if the firm has the actual ability to obtain sufficient capital to finance the conversion, including all necessary land, coal and ash handling equipment, pollution control equipment, and all other necessary expenditures, without violating legal restrictions on its ability to raise debt or equity capital, unreasonably diluting shareholder equity, or unreasonably adversely affecting its credit rating. OFP will consider any economic or financial factors presented by the proposed order recipient in determining the firm's ability or inability to finance the conversion including, but not limited to, the following:

(1) The required coverage ratios on the firm's debt and preferred stock;

(2) The firm's investment program; and

(3) The financial impact of the conversion, including other conversions which are or may be undertaken voluntarily by the proposed order recipient or imposed upon the recipient's system by the Act, and including pending or planned construction or reconstruction of alternate-fuel-fired plants and plants exempt from FUA prohibitions. 7 Where helpful in clarifying the long-term financial feasibility of a conversion, DOE may analyze the economic benefits anticipated from operation of the converted unit or units using coal or other alternate fuel relative to those from continued operation using petroleum or natural gas.

7 OFP will not require the proposed order recipient to cancel or defer construction or reconstruction of any alternate-fuel-fired facility, or any facility exempt from the prohibitions of the Act, for which a decision to finance such facility has been made by the appropriate company official before the publication of the prohibition order. The proposed order recipient may choose to cancel or defer any such facility.

(Approved by the Office of Management and Budget under control number 1903-0077)

(Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and 15 U.S.C. 719 et seq.; Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[45 FR 53692, Aug. 12, 1980, as amended at 47 FR 17044, Apr. 21, 1982; 47 FR 50849, Nov. 10, 1982]

§ 504.7 Prohibition against excessive use of petroleum or natural gas in mixtures—electing powerplants.

(a) In the case of electing powerplants, if OFP finds that it is technically and financially feasible for a unit to use a mixture of petroleum or natural gas and an alternate fuel as its primary energy source, OFP may prohibit, by order, the use in that unit of petroleum or natural gas, or both, in amounts exceeding the minimum amount necessary to maintain reliability of operation consistent with maintaining reasonable fuel efficiency of the mixture.

(b) In making the technical feasibility finding required by former section 301 (b) and (c) of the Act and paragraph (a) of this section, OFP may weigh “physical modification” or “derating of the unit,” but these considerations, by themselves, will not control the technical feasibility finding. A technical feasibility finding might be made notwithstanding the need for substantial physical modification. The economic consequences of a substantial physical modification are taken into account in determining financial feasibility.

(Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and 15 U.S.C. 719 et seq.; Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, 92 Stat. 3269 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981 (Pub. L. 97-35); E.O. 12009, 42 FR 46267, Sept. 15, 1977)

[47 FR 17045, Apr. 21, 1982, and 47 FR 50850, Nov. 10, 1982]

§ 504.8 Prohibitions against excessive use of petroleum or natural gas in mixtures—certifying powerplants.

(a) In the case of certifying powerplants, OFP may prohibit the use of petroleum or natural gas in such powerplant in amounts exceeding the minimum amount necessary to maintain reliability of operation consistent with maintaining the reasonable fuel efficiency of the mixture. This authority is contained in section 301(c) of the Act, as amended. The owner or operator of the powerplant may certify at any time to OFP that it is technically capable and financially feasible for the unit to use a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source. In assessing whether the unit is technically capable of using a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source, for purposes of this section, the extent of any physical modification necessary to convert the unit and any concomitant reduction in rated capacity are not relevant factors. So long as a unit as proposed to be modified would be technically capable of using the mixture as a primary energy source under § 504.6(c), this certification requirement shall be deemed met. The criteria for certification of financial feasibility are found at § 504.6(f). In addition, the powerplant's owner or operator must submit a prohibition compliance schedule, which meets the requirements of § 504.5(d).

(b) If OFP concurs with the certification, a prohibition order against the unit's excessive use of petroleum or natural gas in the mixture will be issued following the procedure outlined in § 501.52 of these regulations.

(c) The petitioner may seek to amend its certification in order to take into account changes in relevant facts and circumstances by following the procedure contained in § 501.52(d).

Note:

The authority of OFP implemented under this section should not be confused with the other two fuel mixture provisions of these regulations. One is the general requirement that petitioners for permanent exemptions demonstrate that the use of a mixture of natural gas or petroleum and an alternate fuel is not economically or technically feasible (See § 504.15). The second is the permanent fuel mixtures exemption itself (See § 504.56).

(Approved by the Office of Management and Budget under control number 1903-0077)

(Department of Energy Organization Act, Pub. L. 95-91 (42 U.S.C. 7101 et seq.); Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620 (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35)

[47 FR 17045, Apr. 21, 1982]

§ 504.9 Environmental requirements for certifying powerplants.

Under §§ 501.52, 504.5 and 504.6 of these regulations, OFP may prohibit, in accordance with section 301 and section 303 (a) or (b) of FUA, as amended, the use of natural gas or petroleum, or both, as a primary energy source in any certifying powerplant. Under sections 301(c) and 303(a) of FUA, as amended, and §§ 501.52, 504.6, and 504.8 of these regulations, OFP may prohibit the excessive use of natural gas or petroleum in a mixture with an alternate fuel as a primary energy source in a certifying powerplant.

(a) NEPA compliance. Except as provided in paragraph (c) of this section, where the owner or operator of a powerplant seeks to obtain an OFP prohibition order through the certification procedure, and did not hold either a proposed prohibition order under former section 301 of FUA or pending order under section 2 of ESECA, it will be responsible for the costs of preparing any necessary Environmental Assessment (EA) or Environmental Impact Statement (EIS) arising from OFP's obligation to comply with NEPA. The powerplant owner or operator shall enter into a contract with an independent party selected by OFP, who is qualified to conduct an environmental review and prepare an EA or EIS, as appropriate, and who does not have a financial or other interest in the outcome of the proceedings, under the supervision of OFP. The NEPA process must be completed and approved before OFP will issue a final prohibition order based on the certification.

(b) Environmental review procedure. Except as provided in paragraph (c) of this section, environmental documents, including the EA and EIS, where necessary, will be prepared utilizing the process set forth above. OFP, the powerplant owner or operator and the independent third party shall enter into an agreement for the owner or operator to engage and pay directly for the services of the qualified third party to prepare the necessary documents. The third party will execute an OFP prepared disclosure document stating that he does not have any conflict of interest, financial or otherwise, in the outcome of either the environmental process or the prohibition order proceeding. The agreement shall outline the responsibilities of each party and his relationship to the other two parties regarding the work to be done or supervised. OFP shall approve the information to be developed and supervise the gathering, analysis and presentation of the information. In addition, OFP will have the authority to approve and modify any statement, analysis, and conclusion contained in the third party prepared environmental documents.

(c) Financial hardship. Whenever the bona fide estimate of the costs associated with NEPA compliance, if borne by the powerplant owner or operator, would make the conversion financially infeasible, OFP may waive the requirement set forth in paragraphs (a) and (b) of this section and perform the necessary environmental review.

(Approved by the Office of Management and Budget under control number 1903-0077)

(Department of Energy Organization Act, Pub. L. 95-91 (42 U.S.C. 7101 et seq.); Energy Supply and Environmental Coordination Act of 1974, Pub. L. 93-319, as amended by Pub. L. 94-163, Pub. L. 95-70, and Pub. L. 95-620 (15 U.S.C. 719 et seq.); Powerplant and Industrial Fuel Use Act of 1978, Pub. L. 95-620, as amended by Pub. L. 97-35 (42 U.S.C. 8301 et seq.); Omnibus Budget Reconciliation Act of 1981, Pub. L. 97-35)

[47 FR 17046, Apr. 21, 1982]

Appendix I to Part 504 Procedures for the Computation of the Real Cost of Capital

(a) The firm's real after-tax weighted average marginal cost of capital (K) is computed with equation 1.

The terms in equation 1 are defined as follows:

Wd = Fraction of existing capital structure which is debt.

Wp = Fraction of existing capital structure which is preferred equity.

We = Fraction of existing capital structure which is common equity and retained earnings.

R d = Predicted nominal cost of long term debt expressed as a fraction.

R p = Predicted nominal cost of preferred stock expressed as a fraction.

R e = Predicted nominal cost of common stock expressed as a fraction.

INF = Percentage change in the GNP implicit price deflator over the past 12 months expressed as a fraction.

fd = Flotation cost of debt expressed as a fraction.

fp = Flotation cost of preferred stock expressed as a fraction.

fe = Flotation cost of common stock expressed as a fraction.

t = Marginal federal income tax rate for the current year.

(b) Information on parameters used in Equation 1. (1) The parameters used in equation 1 will be the best practicable estimates. They will be obtained from the firm, accepted rating services (e.g., Standard & Poors, Moody's), government publications, accepted financial publications, annual financial reports and statements of firms, and investment bankers.

(2) The predicted nominal cost of debt (R d) may be estimated by determining the current average yield on newly issued bonds—industrial or utility as appropriate—which have the same rating as the firm's most recent debt issue.

(3) The predicted nominal cost of preferred stock (R p) may be estimated by determining the current average yield on newly issued preferred stock—industrial or utility as appropriate—which has the same rating as the firm's most recent preferred stock issue.

(4)(A) The predicted nominal cost of common stock (R e) is computed with equation 2.

Eq 2 R e = R f + B × R m

where:

R f = The risk free interest rate—the average of the most recent auction rates of U.S. Government 13-week Treasury Bills,

B = The “beta” coefficient—the relationship between the excess return on common stock and the excess return on the S&P 500 composite index, and

R m = The mean excess return on the S&P 500 composite index—the mean of the difference between the return on the S&P 500 composite index and the risk free interest rate for the years 1926-1976 as computed by Ibbotson and Sinquefield(1)—9.2%

(B) The “beta” coefficient is computed with regression analysis techniques. The regression equation is Equation 3.

(R et − R ft) = A + B(R mt − R ft) + e t

Eq. 3

where

Rft = The risk free interest rate in month t—the average of the yields on 13-week treasury bills auctioned in month t.(2)

A = A constant which should not be significantly different than zero.

e t = The error in month t.

PRCC t = Closing market prices of the firm's common stock at the end of month t fully adjusted for splits and stock dividends.

DIVRATE t = The sum of the dividends paid in the fiscal year which contain month t.

V sp,t = The market value of “one share” of the S&P 500 composite index at the end of month t.

D sp,t = The estimated monthly income received from holding “one share” of the S&P 500 in month t.

The regression analysis is done with sixty months of data. The first month (t = 1) is sixty months before the month in which the firm's current fiscal year started. The last month (t = 60) is the last month of the past fiscal year.

(5) Where the parameters specified above are not obtainable, alternate parameters that closely correspond to those above may be used. This may include substituting a bond yield for nominal cost of preferred stock where the former is not available. Where the capital structure does not consist of any debt, preferred equity, or common equity, an alternate methodology to predict the firm's real after-tax marginal cost of capital may be used.

Example of using alternate parameters that closely correspond to those above are:

(A) In the case of industrials, who do not typically issue preferred stock, the predicted nominal cost of preferred stock (R P) can be estimated by determining the current average yield on newly issued industrial bonds which have the same rating as the firm's most recent debt issue.

(B) If necessary, the following assumptions can be made to determine the nominal cost of debt or preferred stock and their flotation costs.

(i) Where a company issued privately placed debt that was not rated, the rating, applied to preferred stock could be used to determine the cost of debt and its flotation cost.

(ii) Where a company issued privately placed preferred stock that was not rated, the rating applied to debt could be used to determine the cost of preferred stock and its flotation costs.

(iii) In the case where all issues were privately placed, the current average yield on all newly issued debt or preferred could be used to determine the cost of debt or preferred respectively, and an average flotation cost, for debt or preferred, could be used.

(C) Evidence Requirements. Copies of this calculation with notations as to the source of the data must be submitted.

Footnotes

(1) Ibbotson, R.E. and R.A. Sinquefield, Stocks, Bonds, Bills, and Inflation, Charlottesville, Va.: The Financial Analysts Research Foundation, 1977, cited by Ernst & Whinney, Costs of Capital and Rates of Return for Industrial Firms and Class A&B Electric Utility Firms, June 1979, p. 3-8.

(2) As an option, R f t can be developed with the following equation:

where:

D t = The average annual yield on three month U.S. Treasury bills reported in the Survey of Current Business auctioned in month t—which is reported using the bank discount method.

N = Number of days to maturity.

[46 FR 59920, Dec. 7, 1981]

Appendix II to Part 504 Fuel Price Computation

(a) Introduction. This appendix provides the equations and parameters needed to specify the price of the delivered fuels to be used in the cost calculations associated with parts 503 and 504 of these regulations. The delivered price of the fuel to be used to calculate delivered fuel expenses must reflect (1) the price of each fuel at the time of the petition, and (2) the effects of future real price increases for each fuel. The delivered price of an alternate fuel used to calculate delivered fuel expenses must reflect the petitioner's delivered price of the alternate fuel and the effects of real increases in the price of that alternate fuel. Paragraphs (b), (c) and (d) below provide the procedure to: (1) Calculate fuel price and inflation indices; (2) account for projected real increases in fuel prices when planning to burn one or more than one fuel; and (3) account for projected real increases in the price of the alternate fuel. Table II-1 of this appendix (See paragraph (b)) contains example fuel price and inflation indices based on the latest data appearing in the Energy Information Administration's (EIA) Annual Energy Outlook (AEO).

The fuel price and inflation indices will change yearly with the publication of the AEO. Revisions shall become effective after final publication. However, the relevant set of parameters for a specific petition for exemption will be the set in effect at the time the petition is submitted or the set in effect at the time a decision is rendered, whichever is more favorable to the petitioner.

(b) Computation of Fuel Price and Inflation Indices. (1) the Petitioner is responsible for computing the annual fuel price and inflation indices by using Equation II-1 and Equation II-2, respectively. The petitioner may compute the fuel price index specified in Equation II-1 or use his own price index. However, if he uses his own price index, the source or the derivation of the index must be fully documented and be contained in the evidential summary.

EQ II-2 is:

where:

PXVi = The fuel price index for each fuel in year i. P i = Price of fuel in year i.

P o = Price of fuel in base year.

EQ II-2 is:

where:

IX i = The inflation index in year i.

GX i = The NIPA GNP price deflator for year i.

GX o = The NIPA GNP price deflator for the base year.

(2) The parameters to be used in EQ II-1 are the Base Case fuel price projections found in EIA's current AEO.

(3) When computing annual inflation indices, the petitioner is to use the Base Case National Macroeconomic Indicators (NIPA GNP Price Deflator) contained in EIA's current AEO. If necessary, the petitioner must rebase the projection to the same year used for the fuel price projections. For example, in 1989 AEO projects the price deflator in 1982 dollars; this must be rebased to the year in which the petition is filed. The methodology used to rebase the inflation indices must follow standard statistical procedures and must be fully documented within the petition. This index will remain frozen at the last year of the AEO's projection for the remainder of the unit'(s) useful life.

(4) Table II-1 is provided as an example of the application of equations II-1 and II-2. This table contains annual fuel price indices for distillate oil, residual oil, natural gas, and coal. It also contains annual inflation indices. These values were computed from information contained in Table A3 and Table A11 of EIA's AEO, 1989.

Table II-1: Price and Inflation Indices for use in the Cost Calculations

Year | Distillate (DPX) | Residual (RPX) | Natural gas (GPX) | Coal (CPX) | Inflation (IX)

1986 | 1.0000 | 1.0000 | 1.0000 | 1.0000 | 1.0000

1987 | 0.9810 | 1.2134 | 0.9508 | 0.9231 | 1.0334

1988 | 0.9429 | 0.9407 | 0.8934 | 0.8876 | 1.0658

1989 | 0.8929 | 0.9328 | 0.9057 | 0.8639 | 1.1054

1990 | 0.9905 | 1.0119 | 0.9221 | 0.9112 | 1.1607

1991 | 1.0381 | 1.0751 | 0.9344 | 0.9172 | 1.2204

1992 | 1.0929 | 1.1344 | 1.0205 | 0.9231 | 1.2836

1993 | 1.1595 | 1.2292 | 1.1148 | 0.9349 | 1.3512

1994 | 1.2286 | 1.3241 | 1.1844 | 0.9467 | 1.4214

1995 | 1.3000 | 1.4150 | 1.2705 | 0.9527 | 1.4960

1996 | 1.4000 | 1.5415 | 1.4016 | 0.9586 | 1.5768

1997 | 1.4762 | 1.6403 | 1.4918 | 0.9704 | 1.6585

1998 | 1.5452 | 1.7273 | 1.5615 | 0.9763 | 1.7410

1999 | 1.6143 | 1.7905 | 1.6475 | 0.9882 | 1.8235

2000 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2001 | 1.6690 | I.8340 | 1.7049 | 0.9941 | 1.9025

2002 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2003 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2004 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2005 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2006 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2007 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2008 | 1.6690 | 1.8430 | 1.7049 | 0.9941 | 1.9025

2009 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

2010 | 1.6690 | 1.8340 | 1.7049 | 0.9941 | 1.9025

(C) Fuel Price Computation. (1) The delivered price of the proposed fuel to be burned (FPB i) must reflect the real escalation rate of the proposed fuel, and must be computed with Equation EQ II-3.

EQ-II-3 is: FPB i = MPB [PX i]

where:

FPB i = Price of the proposed fuel (distillate oil, residual oil, or natural gas) in year i.

MPB = The current delivered market price of the proposed fuel.

PX i = The fuel price index value in year i, computed with Equation II-1.

or:

(2) When planning to use more than one fuel in the proposed unit(s), the petitioner must use Equation II-1 and Equation II-3 to calculate the annual fuel price of each fuel to be used. The petitioner then must estimate the proportion of each fuel to be burned annually over the useful life of the unit(s). With these proportions and the respective annual fuel prices for each fuel, the petitioner must compute an annual weighted average fuel price. The methodology used to calculate the weighted average fuel price must follow standard statistical procedures and be fully documented within the petition.

(d) Fuel Price Computation—Alternate Fuel. The delivered price of alternate fuel (PFAi) must reflect the real escalation rate of alternate fuel and must be computed with Equation II-4.

Equation II-4 is:

PFAi = APF × apxi

where:

PFA = The price of the alternate fuel in year i.

APF −i = The current market price of the alternate fuel f.o.b. the facility).

APX i = The alternate fuel price index value for year i, computed with Equation II-1.

In most cases the alternate fuel will be coal. The petitioner must use Equation II-1 (paragraph (b)) to compute the escalation rate (APXi). If an alternate fuel other than coal is proposed the source or the derivation of the index must be fully documented and be contained in the evidential summary.

[54 FR 52896, Dec. 22, 1989]

508 PART 508 [RESERVED]

516 PART 516 [RESERVED]

SUBCHAPTER G NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION)

PART 580 CURTAILMENT PRIORITIES FOR ESSENTIAL AGRICULTURAL USES

Authority: Secs. 401, 403, Pub. L. 95-621, 92 Stat. 3394-3395, 3396; secs. 301(b), 402(a), Pub. L. 95-91, 91 Stat. 578, 594, (42 U.S.C. 7115(b), 7117(a)); E.O. 12009, 42 FR 46267.

Source: 44 FR 15646, Mar. 15, 1979, unless otherwise noted.

§ 580.01 Purpose.

The purpose of this part is to implement the authority granted to the Secretary of Energy in section 401 of the Natural Gas Policy Act of 1978, Public Law 95-621, 92 Stat. 3394-3395 (1978).

§ 580.02 Definitions.

(a) Terms defined in section 2 of the Natural Gas Policy Act of 1978 shall have the same meaning, as applicable, for purposes of this part, unless further defined in paragraph (b) of this section.

(b) The following definitions are applicable to this part:

(1) Commercial establishment means any establishment, (including institutions and local, state and federal government agencies) engaged primarily in the sale of goods or services, where natural gas is used for purposes other than those involving manufacturing or electric power generation.

(2) Essential agricultural use means any use of natural gas:

(i) For agricultural production, natural fiber production, natural fiber processing, food processing, food quality maintenance, irrigation pumping, crop drying; or

(ii) As a process fuel or feedstock in the production of fertilizer, agricultural chemicals, animal feed, or food which the Secretary of Agriculture determines is necessary for full food and fiber production.

(3) Essential agricultural user means any person who uses natural gas for an essential agricultural use as defined in paragraph (b)(2) of this section.

(4) Hospital means a facility whose primary function is delivering medical care to patients who remain at the facility, including nursing and convalescent homes. Outpatient clinics or doctors' offices are not included in this definition.

(5) High-priority use means any use of natural gas by a high-priority user as defined in paragraph (a)(6) of this section.

(6) High-priority user means, in no specific order, any person who uses natural gas:

(i) In a residence, or

(ii) In a commercial establishment in amounts of less than 50 Mcf on a peak day; or

(iii) In any school or hospital; or

(iv) For minimum plant protection when operations are shut down, for police protection, for fire protection, in a sanitation facility, in a correctional facility, or for emergency situations pursuant to 18 CFR 2.78(a)(4).

(7) Interstate pipeline means any person engaged in natural gas transportation subject to the jurisdiction of the Federal Energy Regulatory Commission under the Natural Gas Act.

(8) Residence means a dwelling using natural gas predominately for residential purposes such as space heating, air conditioning, hot water heating, cooking, clothes drying, and other residential uses, and includes apartment buildings and other multi-unit residential buildings.

(9) School means a facility, the primary function of which is to deliver instruction to regularly enrolled students in attendance at such facility. Facilities used for both educational and non-educational activities are not included under this definition unless the latter are merely incidental to the delivery of instruction.

§ 580.03 Curtailment priorities.

(a) Notwithstanding any provision of law other than section 401(b) of the Natural Gas Policy Act of 1978, or any other rule, regulation, or order of the Department of Energy, the Federal Energy Regulatory Commission or their predecessor agencies, and to the maximum extent practicable, no curtailment plan of an interstate pipeline may provide for curtailment of deliveries of natural gas for any essential agricultural use, unless:

(1) Such curtailment does not reduce the quantity of natural gas delivered for such use below the use requirement certified by the Secretary of Agriculture under section 401(c) of the Natural Gas Policy Act of 1978 in order to meet the requirements of full food and fiber production; or

(2) Such curtailment is necessary in order to meet the requirements of high-priority users; or

(3) The Federal Energy Regulatory Commission, in consultation with the Secretary of Agriculture, determines, by rule or order issued pursuant to section 401(b) of the Natural Gas Policy Act of 1978, that use of a fuel (other than natural gas) is economically practicable and that the fuel is reasonably available as an alternative for such essential agricultural use.

(b) Any essential agricultural user who also qualifies as a high-priority user shall be a high-priority user for purposes of paragraph (a) of this section.

(c) The specific relative order of priority for all uses and users of natural gas, including high-priority and essential agricultural uses and users, shall remain as reflected in effective curtailment plans of interstate pipelines filed with the Federal Energy Regulatory Commission to the extent that the relative order of priorities does not conflict with paragraph (a) of this section.

(d) Nothing in this rule shall prohibit the injection of natural gas into storage by interstate pipelines or deliveries to its customers for their injection into storage unless it is demonstrated to the Federal Energy Regulatory Commission that these injections or deliveries are not reasonably necessary to meet the requirements of high-priority users or essential agricultural uses.

§ 580.04 Administrative procedures. [Reserved]

PART 590 ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS

Authority: Secs. 301(b), 402(f), and 644, Pub. L. 95-91, 91 Stat. 578, 585, and 599 (42 U.S.C. 7151(b), 7172(f), and 7254), Sec. 3, Act of June 21, 1938, c. 556, 52 Stat. 822 (15 U.S.C. 717b); E.O. 12009 (42 FR 46267, September 15, 1977); DOE Delegation Order Nos. 0204-111 and 0204-127 (49 FR 6684, February 22, 1984; 54 FR 11437, March 20, 1989).

Source: 54 FR 53531, Dec. 29, 1989, unless otherwise noted.

Subpart A General Provisions
§ 590.100 OMB Control Numbers.

The information collection requirements contained in this part have been approved by the Office of Management and Budget under Control No. 1903-0081.

§ 590.101 Purpose and scope.

The purpose of this part is to establish the rules and procedures required to be followed by persons to obtain authorizations from DOE to import or export natural gas under the Natural Gas Act and by all other persons interested in participating in a natural gas import or export proceeding before the agency. This part establishes the procedural rules necessary to implement the authorities vested in the Secretary of Energy by sections 301(b) and 402(f) of the DOE Act, which have been delegated to the Assistant Secretary.

§ 590.102 Definitions.

As used in this part:

(a) Assistant Secretary means the Assistant Secretary for Fossil Energy or any employee of the DOE who has been delegated final decisional authority.

(b) Contested proceeding means a proceeding:

(1) Where a protest or a motion to intervene, or a notice of intervention, in opposition to an application or other requested action has been filed, or

(2) Where a party otherwise notifies the Assistant Secretary and the other parties to a proceeding in writing that it opposes an application or other requested action.

(c) Decisional employee means the Assistant Secretary, presiding officials at conferences, oral presentations or trial-type hearings, and any other employee of the DOE, including consultants and contractors, who are, or may reasonably be expected to be, involved in the decision-making process, including advising the Assistant Secretary on the resolution of issues involved in a proceeding. The term includes those employees of the DOE assisting in the conduct of trial-type hearings by performing functions on behalf of the Assistant Secretary or presiding official.

(d) DOE means the Department of Energy, of which FE is a part.

(e) DOE Act means the Department of Energy Organization Act, Public Law 95-91, 91 Stat. 565 (42 U.S.C. 7101 et seq.).

(f) FE means the Office of The Assistant Secretary for Fossil Energy.

(g) FERC means the Federal Energy Regulatory Commission.

(h) Interested person means a person, other than a decisional employee, whose interest in a proceeding goes beyond the general interest of the public as a whole and includes applicants, intervenors, competitors of applicants, and other individuals and organizations, including non-profit and public interest organizations, and state, local, and other public officials, with a proprietary, financial or other special interest in the outcome of a proceeding. The term does not include other federal agencies or foreign governments and their representatives, unless the agency, foreign government, or representative of a foreign government is a party to the proceeding.

(i) Natural gas means natural gas and mixtures of natural gas and synthetic natural gas, regardless of physical form or phase, including liquefied natural gas and gels primarily composed of natural gas.

(j) NGA means the Natural Gas Act of June 21, 1938, c. 556, 52 Stat. 821 (15 U.S.C. 717 et seq.).

(k) Off-the-record communication means a written or oral communication not on the record which is relevant to the merits of a proceeding, and about which the parties have not been given reasonable prior notice of the nature and purpose of the communication and an opportunity to be present during such communication or, in the case of a written communication, an opportunity to respond to the communication. It does not include communications concerned solely with procedures which are not relevant to the merits of a proceeding. It also does not include general background discussions about an entire industry or natural gas markets or communications of a general nature made in the course of developing agency policy for future general application, even though these discussions may relate to the merits of a particular proceeding.

(l) Party means an applicant, any person who has filed a motion for and been granted intervenor status or whose motion to intervene is pending, and any state commission which has intervened by notice pursuant to § 590.303(a).

(m) Person means any individual, firm, estate, trust, partnership, association, company, joint-venture, corporation, United States local, state and federal governmental unit or instrumentality thereof, charitable, educational or other institution, and others, including any officer, director, owner, employee, or duly authorized representative of any of the foregoing.

(n) Presiding official means any employee of the DOE who has been designated by the Assistant Secretary to conduct any stage of a proceeding, which may include presiding at a conference, oral presentation, or trial-type hearing, and who has been delegated the authority of the Assistant Secretary to make rulings and issue orders in the conduct of such proceeding, other than final opinions and orders, orders to show cause, emergency interim orders, or conditional decisions under subpart D and orders on rehearing under subpart E.

(o) Proceeding means the process and activity, and any part thereof, instituted by FE either in response to an application, petition, motion or other filing under this part, or on its own initiative, by which FE develops and considers the relevant facts, policy and applicable law concerning the importation or exportation of natural gas and which may lead to the issuance of an order by the Assistant Secretary under subparts D and E.

(p) Small-scale natural gas export means an export of natural gas to nations with which there is not in effect a free trade agreement with the United States requiring national treatment for trade in natural gas and with which trade is not prohibited by U.S. law or policy, provided that the application for such export authority satisfies the following two criteria:

(1) The application proposes to export natural gas in a volume up to and including 51.75 billion cubic feet per year, and

(2) DOE's approval of the application does not require an environmental impact statement or an environmental assessment under the National Environmental Policy Act, 42 U.S.C. 4321 et seq.

(q) State commission means the regulatory body of a state or municipality having jurisdiction to regulate rates and charges for the sale of natural gas to consumers within the state or municipality, or having any regulatory jurisdiction over parties involved in the import or export arrangement.

[54 FR 53531, Dec. 29, 1989, as amended at 83 FR 35119, July 25, 2018]

§ 590.103 General requirements for filing documents with FE.

(a) Any document, including but not limited to an application, amendment of an application, request, petition, motion, answer, comment, protest, complaint, and any exhibit submitted in connection with such documents, shall be filed with FE in accordance with the instructions at FE's website: https://www.energy.gov/fe/regulation.

(b) Upon receipt by FE, each application or other initial request for action shall be assigned a docket number. Any petition, motion, answer, request, comment, protest, complaint or other document filed subsequently in a docketed proceeding with FE shall refer to the assigned docket number. All documents shall be signed either by the person upon whose behalf the document is filed or by an authorized representative. Documents signed by an authorized representative shall contain a certified statement that the representative is a duly authorized representative unless the representative has a certified statement already on file in the FE docket of the proceeding. All documents shall also be verified under oath or affirmation by the person filing, or by an officer or authorized representative of the firm having knowledge of the facts alleged. Each document filed with FE shall contain a certification that a copy has been served as required by § 590.107 and indicate the date of service. Service of each document must be made not later than the date of the filing of the document.

(c) A person who files an application shall state whether, to the best knowledge of that person, the same or a related matter is being considered by any other part of the DOE, including the FERC, or any other Federal agency or department and, if so, shall identify the matter and the agency or department.

[54 FR 53531, Dec. 29, 1989, as amended at 90 FR 20761, May 16, 2025]

§ 590.104 Address for filing documents.

Documents shall be filed in accordance with the instructions at FE's website: https://www.energy.gov/fe/regulation.

[90 FR 20761, May 16, 2025]

§ 590.105 Computation of time.

(a) In computing any period of time prescribed or allowed by these regulations, the day of the act or event from which the designated period of time begins to run is not included. The period of time begins to run the next day after the day of the act or event. The last day of the period so computed is included unless it is a Saturday, Sunday, or legal Federal holiday, in which event the period runs until the end of the next day that is neither a Saturday, Sunday, nor a legal Federal holiday, unless otherwise provided by this part or by the terms of an FE order. Documents received after the regular business hours of 8 a.m. to 4:30 p.m. are deemed filed on the next regular business day.

(b) When a document is required to be filed with FE within a prescribed time, an extension of time to file may be granted for good cause shown.

(c) An order is issued and effective when date stamped after the order has been signed unless another effective date is specified in the order.

[54 FR 53531, Dec. 29, 1989, as amended at 90 FR 20761, May 16, 2025]

§ 590.106 Dockets.

The FE shall maintain a docket file of each proceeding under this part, which shall contain the official record upon which all orders provided for in subparts D and E shall be based. The official record in a particular proceeding shall include the official service list, all documents filed under § 590.103, the official transcripts of any procedures held under subpart C, and opinions and orders issued by FE under subparts D and E, and reports of contract amendments under § 590.407. All dockets are available online (https://www.energy.gov/fe/articles/electronic-docket-room-e-docket-room). Additional information about the contents of dockets and how to access them can be found here: https://www.energy.gov/fe/regulation.

[54 FR 53531, Dec. 29, 1989, as amended at 90 FR 20761, May 16, 2025]

§ 590.107 Service.

(a) An applicant, any other party to a proceeding, or a person filing a protest shall serve a copy of all documents filed with FE upon all parties unless otherwise provided in this part. The copy of a document served upon parties shall be a true copy of the document filed with FE, but does not have to be a copy stamped with the time and date of receipt by FE. The FE shall maintain an official service list for each proceeding which shall be provided upon request.

(b) When the parties are not known, such as during the initial comment period following publication of the notice of application, service requirements under paragraph (a) of this section may be met by serving a copy of all documents on the applicant and on FE for inclusion in the FE docket in the proceeding.

(c) All documents required to be served under this part may be served electronically (preferred), by hand, certified mail, registered mail, or regular mail. It shall be the responsibility of the serving party to ensure that service is effected in a timely manner. Service is deemed complete upon delivery or upon mailing, whichever occurs first.

(d) Service upon a person's duly authorized representatives on the official service list shall constitute service upon that person.

(e) All FE orders, notices, or other FE documents shall be served on the parties by FE either electronically (preferred), by hand, registered mail, certified mail, or regular mail, except as otherwise provided in this part.

[54 FR 53531, Dec. 29, 1989, as amended at 90 FR 20761, May 16, 2025]

§ 590.108 Off-the-record communications.

(a) In any contested proceeding under this part:

(1) No interested person shall make an off-the-record communication or knowingly cause an off-the-record communication to be made to any decisional employee.

(2) No decisional employee shall make an off-the-record communication or knowingly cause an off-the-record communication to be made to any interested person.

(3) A decisional employee who receives, makes, or knowingly causes to be made an oral off-the-record communication prohibited by this section shall prepare a memorandum stating the substance of the communication and any responses made to it.

(4) Within forty-eight (48) hours of the off-the-record communication, a copy of all written off-the-record communications or memoranda prepared in compliance with paragraph (a)(3) of this section shall be delivered by the decisional employee to the Assistant Secretary and to the Deputy Assistant Secretary. The materials will then be made available for public inspection by placing them in the docket associated with the proceeding.

(5) Requests by a party for an opportunity to rebut, on the record, any facts or contentions in an off-the-record communication may be filed in writing with the Assistant Secretary. The Assistant Secretary shall grant such requests only for good cause.

(6) Upon being notified of an off-the-record communication made by a party in violation of this section, the Assistant Secretary may, to the extent consistent with the interests of justice and the policies of the NGA and the DOE Act, require the party to show cause why the party's claim or interest in the proceeding should not be dismissed, denied, disregarded, or otherwise adversely affected on account of the violation.

(b) The prohibitions of paragraph (a) of the section shall apply only to contested proceedings and begin at the time either a protest or a motion to intervene or notice of intervention in opposition to the application or other requested action is filed with FE, or a party otherwise specifically notifies the Assistant Secretary and the other parties in writing of its opposition to the application or other requested action, whichever occurs first.

[54 FR 53531, Dec. 29, 1989, as amended at 90 FR 20761, May 16, 2025]

§ 590.109 FE investigations.

The Assistant Secretary or the Assistant Secretary's delegate may investigate any facts, conditions, practices, or other matters within the scope of this part in order to determine whether any person has violated or is about to violate any provision of the NGA or other statute or any rule, regulation, or order within the Assistant Secretary's jurisdiction. In conducting such investigations, the Assistant Secretary or the Assistant Secretary's delegate may, among other things, subpoena witnesses to testify, subpoena or otherwise require the submission of documents, and order testimony to be taken by deposition.

Subpart B Applications for Authorization To Import or Export Natural Gas
§ 590.201 General.

(a) Any person seeking authorization to import or export natural gas into or from the United States, to amend an existing import or export authorization, or seeking any other requested action, shall file an application with the FE under the provisions of this part.

(b) Applications shall be filed at least ninety (90) days in advance of the proposed import or export or other requested action, unless a later date is permitted for good cause shown.

[54 FR 53531, Dec. 29, 1989; 55 FR 14916, Apr. 19, 1990]

§ 590.202 Contents of applications.

(a) Each application filed under § 590.201 shall contain the exact legal name of the applicant, the names, titles, and mailing addresses of a two persons for the official service list, a statement describing the action sought from FE, the justification for such action, including why the proposed action is not inconsistent with the public interest, and the FE docket number, if applicable.

(b) Each application shall include the matters listed below to the extent applicable. All factual matters shall be supported to the extent practicable by the necessary data or documents. Copies of relevant documents filed or intended to be filed with FERC may be submitted to satisfy the requirements of this section. Topics to be addressed or described shall include:

(1) The scope of the project, including the volumes of natural gas involved, expressed in either Mcf or Bcf and their Btu equivalents, the dates of commencement and completion of the proposed import or export, and the facilities to be utilized or constructed;

(2) The source and security of the natural gas supply to be imported or exported, including contract volumes and a description of the gas reserves supporting the project during the term of the requested authorization;

(3) Identification of all the participants in the transaction, including the parent company, if any, and identification of any corporate or other affiliations among the participants;

(4) The terms of the transaction, such as take-or-pay obligations, make-up provisions, and other terms that affect the marketability of the gas;

(5) The provisions of the import arrangement which establish the base price, volume requirements, transportation and other costs, and allow adjustments during the life of the project, and a demonstration as to why the import arrangement is and will remain competitive over the life of the project and is otherwise not inconsistent with the public interest;

(6) For proposed imports, the need for the natural gas by the applicant or applicant's prospective customers, including a description of the persons who are expected to purchase the natural gas; and for proposed exports, the lack of a national or regional need for the gas; and

(7) The potential environmental impact of the project. To the extent possible, the application shall include a listing and description of any environmental assessments or studies being performed on the proposed gas project. The application shall be updated as the status of any environmental assessments changes.

(c) The application shall also have attached a statement, including a signed opinion of legal counsel, showing that a proposed import or export of natural gas is within the corporate powers of the applicant and a copy of all relevant contracts and purchase agreements.

(d) The Assistant Secretary or the Assistant Secretary's delegate may at any time require the applicant and other parties to make supplemental filings of additional information necessary to resolve issues raised by the application.

(e) All information and data filed in support of or against an application will be placed in the official FE docket file of the proceeding and will not be afforded confidential treatment, unless the party shows why the information or data should be exempted from public disclosure and the Assistant Secretary or Assistant Secretary's delegate determines that such information or data shall be afforded confidential treatment. Such determination shall be made in accordance with 10 CFR 1004.11.

[54 FR 53531, Dec. 29, 1989; 55 FR 18227, May 1, 1990, as amended at 90 FR 20761, May 16, 2025]]

§ 590.203 Deficient applications.

If an application is incomplete or otherwise deemed deficient, the Assistant Secretary or the Assistant Secretary's delegate may require the applicant to submit additional information or exhibits to remedy the deficiency. If the applicant does not remedy the deficiency within the time specified by the Assistant Secretary or the Assistant Secretary's delegate, the application may be dismissed without prejudice to refiling at another time.

§ 590.204 Amendment or withdrawal of applications.

(a) The applicant may amend or supplement the application at any time prior to issuance of the Assistant Secretary's final opinion and order resolving the application, and shall amend or supplement the application whenever there are changes in material facts or conditions upon which the proposal is based.

(b) The Assistant Secretary may for good cause shown by motion of a party or upon the Assistant Secretary's own initiative decline to act on, in whole or in part, an amendment or supplement requested by an applicant under paragraph (a) of this section.

(c) After written notice to FE and service upon the parties of that notice an applicant may withdraw an application. Such withdrawal shall be effective thirty (30) days after notice to FE if the Assistant Secretary does not issue an order to the contrary within that time period.

§ 590.205 Notice of applications.

(a) Upon receipt of an application, the FE shall publish a notice of application in the Federal Register. The notice shall summarize the proposal. Except in emergency circumstances, generally the notice shall provide a time limit of not less than thirty (30) days from the notice's date of publication in the Federal Register for persons to file protests, comments, or a motion to intervene or notice of intervention, as applicable. The notice may also request comments on specific issues or matters of fact, law, or policy raised by the application.

(b) The notice of application shall advise the parties of their right to request additional procedures, including the opportunity to file written comments and to request that a conference, oral presentation, or trial-type hearing be convened. Failure to request additional procedures at this time shall be deemed a waiver of any right to additional procedures should the Assistant Secretary decide to grant the application and authorize the import or export by issuing a final opinion and order in accordance with § 590.316.

(c) Where negotiations between the DOE, including FE, and a foreign government have resulted in a formal policy agreement or statement affecting a particular import or export proceeding, FE shall include in the notice of application a description of the terms or policy positions of that agreement or statement to the extent they apply to the proceeding, and invite comment. A formal policy agreement or statement affecting a particular import or export proceeding that is arrived at after publication of the notice of application shall be placed on the record in that proceeding and the parties given an opportunity to comment thereon.

§ 590.206 Notice of procedures.

In all proceedings where, following a notice of application and the time specified in the notice for the filing of responses thereto, the Assistant Secretary determines to have additional procedures, which may consist of the filing of supplemental written comments, written interrogatories or other discovery procedures, a conference, oral presentation, or trial-type hearing, the Assistant Secretary shall provide the parties with notice of the procedures the Assistant Secretary has determined to follow in the proceeding and advise the parties of their right to request any additional procedures in accordance with the provisions of § 590.310. The notice of procedures may identify and request comments on specific issues of fact, law, or policy relevant to the proceeding and may establish a time limit for requesting additional procedures.

§ 590.207 Filing fees.

A non-refundable filing fee of fifty dollars ($50) shall accompany each application filed under § 590.201. Instructions on submitting the filing fee can be found here: https://www.energy.gov/fe/submitting-electronic-payment.

[54 FR 53531, Dec. 29, 1989, as amended at 90 FR 20761, May 16, 2025]

§ 590.208 Small volume exports.

(a) Small-scale natural gas exports. Small-scale natural gas exports are deemed to be consistent with the public interest under section 3(a) of the Natural Gas Act, 15 U.S.C. 717b(a). DOE will issue an export authorization upon receipt of any complete application to conduct small-scale natural gas exports. DOE's regulations regarding notice of applications, 10 CFR 590.205, and procedures applicable to application proceedings, 10 CFR part 590, subpart C (10 CFR 590.303 to 10 CFR 590.317), are not applicable to small-scale natural gas exports.

(b) Scientific, experimental, or other non-utility natural gas exports. Any person may export up to 100,000 cubic feet of natural gas (14.73 pounds per square inch at 60 degrees Fahrenheit) or the liquefied or compressed equivalent thereof, in a single shipment for scientific, experimental, or other non-utility gas use without prior authorization of the Assistant Secretary.

[83 FR 35119, July 25, 2018]

§ 590.209 Exchanges by displacement.

Any importer of natural gas may enter into an exchange by displacement agreement without the prior authorization of the Assistant Secretary when the net effect of the exchange is no different than under the importer's existing authorization. An exchange by displacement is an arrangement whereby authorized imported volumes are displaced by other gas for purposes of storage or flexibility. The term of the exchange agreement may not exceed five (5) years, the volumes imported may not exceed the importer's existing import authorization, and no actual natural gas may flow across the United States border under the terms of the exchange agreement. Any importer who enters into an exchange agreement pursuant to this section shall file with FE within fifteen (15) days after the start up of the exchange, a written description of the transaction, the exact volume of natural gas to be displaced, the name of the purchaser, and the import authorization under which the exchange is being carried out.

Subpart C Procedures
§ 590.301 General.

The procedures of this subpart are applicable to proceedings conducted on all applications or other requested actions filed under this part. The Assistant Secretary may conduct all aspects of the procedures of this subpart or may designate a presiding official pursuant to § 590.314.

§ 590.302 Motions and answers.

(a) Motions for any procedural or interlocutory ruling shall set forth the ruling or relief requested and state the grounds and the statutory or other authority relied upon. All written motions shall comply with the filing requirements of § 590.103. Motions made during conferences, oral presentations or trial-type hearings may be stated orally upon the record, unless the Assistant Secretary or the presiding official determines otherwise.

(b) Any party may file an answer to any written motion within fifteen (15) days after the motion is filed, unless another period of time is established by the Assistant Secretary or the presiding official. Answers shall be in writing and shall detail each material allegation of the motion being answered. Answers shall state clearly and concisely the facts and legal authorities relied upon.

(c) Any motion, except for motions seeking intervention or requesting that a conference, oral presentation or trial-type hearing be held, shall be deemed to have been denied, unless the Assistant Secretary or presiding official acts within thirty (30) days after the motion is filed.

§ 590.303 Interventions and answers.

(a) A state commission may intervene in a proceeding under this part as a matter of right and become a party to the proceeding by filing a notice of intervention no later than the date fixed for filing motions to intervene in the applicable FE notice or order. If the period for filing the notice has expired, a state commission may be permitted to intervene by complying with the filing and other requirements applicable to any other person seeking to become a party to the proceeding as provided in this section.

(b) Any other person who seeks to become a party to a proceeding shall file a motion to intervene, which sets out clearly and concisely the facts upon which the petitioner's claim of interest is based.

(c) A motion to intervene shall state, to the extent known, the position taken by the movant and the factual and legal basis for such positions in order to advise the parties and the Assistant Secretary as to the specific issues of policy, fact, or law to be raised or controverted.

(d) Motions to intervene may be filed at any time following the filing of an application, but no later than the date fixed for filing such motions or notices in the applicable FE notice or order, unless a later date is permitted by the Assistant Secretary for good cause shown and after considering the impact of granting the late motion of the proceeding. Each motion or notice shall list the names, titles, and mailing addresses of a maximum of two persons for the official service list.

(e) Any party may file an answer to a motion to intervene, but such answer shall be made within fifteen (15) days after the motion to intervene was filed, unless a later date is permitted by the Assistant Secretary for good cause shown. Answers shall be in writing. Answers shall detail each material allegation of the motion to intervene being answered and state clearly and concisely the facts and legal authorities relied upon. Failure to answer is deemed a waiver of any objection to the intervention. This paragraph does not prevent the Assistant Secretary from ruling on a motion to intervene and issuing a final opinion and order in accordance with § 590.316 prior to the expiration of the fifteen (15) days in which a party has to answer a motion to intervene.

(f) If an answer in opposition to a motion to intervene is timely filed or if the motion to intervene is not timely filed, then the movant becomes a party only after the motion to intervene is expressly granted.

(g) If no answer in opposition to a motion to intervene is filed within the period of time prescribed in paragraph (e) of this section, the motion to intervene shall be deemed to be granted, unless the Assistant Secretary denies the motion in whole or in part or otherwise limits the intervention prior to the expiration of the time allowed in paragraph (e) for filing an answer to the motion to intervene. Where the motion to intervene is deemed granted, the participation of the intervenor shall be limited to matters affecting asserted rights and interests specifically set forth in the motion to intervene, and the admission of such intervenor to party status shall not be construed as recognition by FE that the intervenor might be aggrieved because of any order issued.

(h) In the event that a motion for late intervention is granted, an intervenor shall accept the record of the proceeding as it was developed prior to the intervention.

§ 590.304 Protests and answers.

(a) Any person objecting to an application filed under § 590.201 of this part or to any action taken by FE under this part may file a protest. No particular form is required. The protest shall identify the person filing the protest, the application or action being objected to, and provide a concise statement of the reasons for the protest.

(b) The filing of a protest, without also filing a motion to intervene or a notice of intervention, shall not make the person filing the protest a party to the proceeding.

(c) A protest shall be made part of the official FE docket file in the proceeding and shall be considered as a statement of position of the person filing the protest, but not as establishing the validity of any assertion upon which the decision would be based.

(d) Protests shall be served on the applicant and all parties by the person filing the protest. If the person filing the protest is unable to provide service on any person identified as a party to the proceeding after a good faith effort, then FE shall effect service. However, when the parties are not known, service requirements may be met by serving a copy on the applicant and on FE as provided in § 590.107(b).

(e) Protests may be filed at any time following the filing of an application, but no later than the date fixed for filing protests in the applicable FE notice or order, unless a later date is permitted by the Assistant Secretary for good cause shown.

(f) Any party may file an answer to a protest but such answer must be filed within fifteen (15) days after the protest was filed, unless a later date is permitted by the Assistant Secretary for good cause shown.

[54 FR 53531, Dec. 29, 1989; 55 FR 14916, Apr. 19, 1990]

§ 590.305 Informal discovery.

The parties to a proceeding may conduct discovery through use of procedures such as written interrogatories or production of documents. In response to a motion by a party, the Assistant Secretary or presiding official may determine the procedures to be utilized for discovery if the parties cannot agree on such procedures.

§ 590.306 Subpoenas.

(a) Subpoenas for the attendance of witnesses at a trial-type hearing or for the production of documentary evidence may be issued upon the initiative of the Assistant Secretary or presiding official, or upon written motion of a party or oral motion of a party during a conference, oral presentation, or trial-type hearing, if the Assistant Secretary or presiding official determines that the evidence sought is relevant and material.

(b) Motions for the issuance of a subpoena shall specify the relevance, materiality, and scope of the testimony or documentary evidence sought, including, as to documentary evidence, specification to the extent possible of the documents sought and the facts to be proven by them, the issues to which they relate, and why the information or evidence was not obtainable through discovery procedures agreed upon by the parties.

(c) If service of a subpoena is made by a United States Marshal or a Deputy United States Marshal, service shall be evidenced by their return. If made by another person, that person shall affirm that service has occurred and file an affidavit to that effect with the original subpoena. A witness who is subpoenaed shall be entitled to witness fees as provided in § 590.315(c).

§ 590.307 Depositions.

(a) Upon motion filed by a party, the Assistant Secretary or presiding official may authorize the taking of testimony of any witness by deposition. Unless otherwise directed in the authorization issued, a witness being deposed may be examined regarding any matter which is relevant to the issues involved in the pending proceeding.

(b) Parties authorized to take a deposition shall provide written notice to the witness and all other parties at least ten (10) days in advance of the deposition unless such advance notice is waived by mutual agreement of the parties.

(c) The requesting motion and notice shall state the name and mailing address of the witness, delineate the subject matters on which the witness is expected to testify, state the reason why the deposition should be taken, indicate the time and place of the deposition, and provide the name and mailing address of the person taking the deposition.

(d) A witness whose testimony is taken by deposition shall be sworn in or shall affirm concerning the matter about which the witness has been called to testify before any questions are asked or testimony given. A witness deposed shall be entitled to witness fees as provided in § 590.315(c).

(e) The moving party shall file the entire deposition with FE after it has been subscribed and certified. No portion of the deposition shall constitute a part of the record in the proceedings unless received in evidence, in whole or in part, by the Assistant Secretary or presiding official.

§ 590.308 Admissions of facts.

(a) At any time prior to the end of a trial-type hearing, or, if there is no trial-type hearing, prior to the issuance of a final opinion and order under § 590.404, any party, the Assistant Secretary, or the presiding official may serve on any party a written request for admission of the truth of any matters at issue in the proceeding that relate to statements or opinions of fact or of the application of law to fact.

(b) A matter shall be considered admitted and conclusively established for the purposes of any proceeding in which a request for admission is served unless, within fifteen (15) days of such time limit established by the Assistant Secretary or presiding official, the party to whom the request is directed answers or objects to the request. Any answer shall specifically admit or deny the matter, or set forth in detail the reasons why the answering party cannot truthfully admit or deny the matter. An answering party may not give lack of information or knowledge as a reason for failure to admit or deny, unless the answering party states that, after reasonable inquiry, the answering party has been unable to obtain sufficient information to admit or deny. If an objection is made, the answering party shall state the reasons for the objection.

(c) If the Assistant Secretary or presiding official determines that an answer to a request for admission does not comply with the requirements of this section, the Assistant Secretary or presiding official may order either that the matter is admitted or that an amended answer be served.

(d) A copy of all requests for admission and answers thereto shall be filed with FE in accordance with § 590.103. Copies of any documents referenced in the request shall be served with the request unless they are known to be in the possession of the other parties.

(e) The Assistant Secretary or presiding official may limit the number of requests for admission of facts in order to expedite a proceeding through elimination of duplicative requests.

§ 590.309 Settlements.

The parties may conduct settlement negotiations. If settlement negotiations are conducted during a conference, at the request of one of the parties, the Assistant Secretary or presiding official may order that the discussions be off-the-record with no transcript of such settlement negotiations being prepared for inclusion in the official record of the proceeding. No offer of settlement, comment or discussion by the parties with respect to an offer of settlement shall be subject to discovery or admissible into evidence against any parties who object to its admission.

§ 590.310 Opportunity for additional procedures.

Any party may file a motion requesting additional procedures, including the opportunity to file written comments, request written interrogatories or other discovery procedures, or request that a conference, oral presentation or trial-type hearing be held. The motion shall describe what type of procedure is requested and include the information required by §§ 590.311, 590.312 and 590.313, as appropriate. Failure to request additional procedures within the time specified in the notice of application or in the notice of procedure, if applicable, shall constitute a waiver of that right unless the Assistant Secretary for good cause shown grants additional time for requesting additional procedures. If no time limit is specified in the notice or order, additional procedures may be requested at any time prior to the issuance of a final opinion and order. At any time during a proceeding, the Assistant Secretary or presiding official may on his or her own initiative determine to provide additional procedures.

[54 FR 53531, Dec. 29, 1989; 55 FR 14916, Apr. 19, 1990]

§ 590.311 Conferences.

(a) Upon motion by a party, a conference of the parties may be convened to adjust or settle the proceedings, set schedules, delineate issues, stipulate certain issues of fact or law, set procedures, and consider other relevant matters where it appears that a conference will materially advance the proceeding. The Assistant Secretary or presiding official may delineate the issues which are to be considered and may place appropriate limitations on the number of intervenors who may participate, if two or more intervenors have substantially like interests.

(b) A motion by a party for a conference shall include a specific showing why a conference will materially advance the proceeding.

(c) Conferences shall be recorded, unless otherwise ordered by the Assistant Secretary or presiding official, and the transcript shall be made a part of the official record of the proceeding and available to the public.

§ 590.312 Oral presentations.

(a) Any party may file a motion requesting an opportunity to make an oral presentation of views, arguments, including arguments of counsel, and data on any aspect of the proceeding. The motion shall identify the substantial question of fact, law or policy at issue and demonstrate that it is material and relevant to the merits of the proceeding. The party may submit material supporting the existence of substantial issues. The Assistant Secretary or presiding official ordinarily will grant a party's motion for an oral presentation, if the Assistant Secretary or presiding official determines that a substantial question of fact, law, or policy is at issue in the proceeding and illumination of that question will be aided materially by such an oral presentation.

(b) The Assistant Secretary or presiding official may require parties making oral presentations to file briefs or other documents prior to the oral presentation. The Assistant Secretary or presiding official also may delineate the issues that are to be considered at the oral presentation and place appropriate limitations on the number of intervenors who may participate if two or more intervenors have substantially like interests.

(c) Oral presentations shall be conducted in an informal manner with the Assistant Secretary or the presiding official and other decisional employees presiding as a panel. The panel may question those parties making an oral presentation. Cross-examination by the parties and other more formal procedures used in trial-type hearings will not be available in oral presentations. The oral presentation may be, but need not be, made by legal counsel.

(d) Oral presentations shall be recorded, and the transcript shall be made part of the official record of the proceeding and available to the public.

§ 590.313 Trial-type hearings.

(a) Any party may file a motion for a trial-type hearing for the purpose of taking evidence on relevant and material issues of fact genuinely in dispute in the proceeding. The motion shall identify the factual issues in dispute and the evidence that will be presented. The party must demonstrate that the issues are genuinely in dispute, relevant and material to the decision and that a trial-type hearing is necessary for a full and true disclosure of the facts. The Assistant Secretary or presiding official shall grant a party's motion for a trial-type hearing, if the Assistant Secretary or presiding official determines that there is a relevant and material factual issue genuinely in dispute and that a trial-type hearing is necessary for a full and true disclosure of the facts.

(b) In trial-type hearings, the parties shall have the right to be represented by counsel, to request discovery, to present the direct and rebuttal testimony of witnesses, to cross-examine witnesses under oath, and to present documentary evidence.

(c) The Assistant Secretary or presiding official upon his or her own initiative or upon the motion of any party may consolidate any proceedings involving common questions of fact in whole or in part for a trial-type hearing. The Assistant Secretary or presiding official may also place appropriate limitations on the number of intervenors who may participate if two or more intervenors have substantially like interests.

(d) The Assistant Secretary or presiding official may make such rulings for trial-type hearings, including delineation of the issues and limitation of cross-examination of a witness, as are necessary to obtain a full and true disclosure of the facts and to limit irrelevant, immaterial, or unduly repetitious evidence.

(e) At trial-type hearings, the Assistant Secretary or presiding official, or any other decisional employee directed by the Assistant Secretary or presiding official, may call witnesses for testimony or presenting exhibits that directly relate to a particular issue of fact to be considered at the hearing. The Assistant Secretary or presiding official, or any other decisional employee directed by the Assistant Secretary or presiding official, may also question witnesses offered by the parties concerning their testimony.

(f) Trial-type hearings shall be recorded, and the transcript shall be made part of the official record of the proceeding and available to the public.

§ 590.314 Presiding officials.

(a) The Assistant Secretary may designate a presiding official to conduct any stage of the proceeding, including officiating at a conference, oral presentation, or trial-type hearing. The presiding official shall have the full authority of the Assistant Secretary during such proceedings.

(b) A presiding official at a conference, oral presentation, or trial-type hearing shall have the authority to regulate the conduct of the proceeding including, but not limited to, determination of the issues to be raised during the course of the conference, oral presentation, or trial-type hearing, administering oaths or affirmations, directing discovery, ruling on objections to the presentation of testimony or exhibits, receiving relevant and material evidence, requiring the advance submission of written testimony and exhibits, ruling on motions, determining the format, directing that briefs be filed with respect to issues raised or to be raised during the course of the conference, oral presentation or trial-type hearing, questioning witnesses, taking reasonable measures to exclude duplicative material, and placing limitations on the number of witnesses to be called by a party.

§ 590.315 Witnesses.

(a) The Assistant Secretary or presiding official may require that the direct testimony of witnesses in trial-type hearings be submitted in advance of the hearing and be under oath, and in written form.

(b) Witnesses who testify in trial-type hearings shall be under oath or affirmation before being allowed to testify.

(c) Witnesses subpoenaed pursuant to § 590.306 shall be paid the same fees and mileage as paid for like services in the District Courts of the United States.

(d) Witnesses subpoenaed pursuant to § 590.307 shall be paid the same fees and mileage as paid for like services in the District Court of the United States.

[54 FR 53531, Dec. 29, 1989; 55 FR 14916, Apr. 19, 1990]

§ 590.316 Shortened proceedings.

In any proceeding where, in response to a notice of application or notice of procedures, if applicable, no party files a motion requesting additional procedures, including the right to file written comments, or the holding of a conference, oral presentation, or trial-type hearing, or where the Assistant Secretary determines that such requested additional procedures are not required pursuant to §§ 590.310, 590.311, 590.312 and 590.313, the Assistant Secretary may issue a final opinion and order on the basis of the official record, including the application and all other filings. In any proceeding in which the Assistant Secretary intends to deny the application or grant the application with the attachment of material conditions unknown to, or likely to be opposed by, the applicant, solely on the basis of the application and responses to the notice of application or notice of procedures, if applicable, without additional procedures, the Assistant Secretary shall advise the parties in writing generally of the issues of concern to the Assistant Secretary upon which the denial or material conditions would be based and provide them with an opportunity to request additional procedures pursuant to §§ 590.310, 590.311, 590.312 and 590.313.

§ 590.317 Complaints.

(a) Any person may file a complaint objecting to the actions by any other person under any statute, rule, order or authorization applicable to an existing import or export authorization over which FE has jurisdiction. No particular form is required. The complaint must be filed with FE in writing and must contain the name and address of the complainant and the respondent and state the facts forming the basis of the complaint.

(b) A complaint concerning an existing import or export authorization shall be served on all parties to the original import or export authorization proceeding either by the complainant or by FE if the complainant has made a good faith effort but has been unable to effect service.

(c) The Assistant Secretary may issue an order to show cause under § 590.401, or may provide opportunity for additional procedures pursuant to §§ 590.310, 590.311, 590.312, or § 590.313, in order to determine what action should be taken in response to the complaint.

Subpart D Opinions and Orders
§ 590.401 Orders to show cause.

A proceeding under this part may commence upon the initiative of the Assistant Secretary or in response to an application by any person requesting FE action against any other person alleged to be in contravention or violation of any authorization, statute, rule, order, or law administered by FE applicable to the import or export of natural gas, or for any other alleged wrong involving importation or exportation of natural gas over which FE has jurisdiction. Any show cause order issued shall identify the matters of interest or the matters complained of that the Assistant Secretary is inquiring about, and shall be deemed to be tentative and for the purpose of framing issues for consideration and decision. The respondent named in the order shall respond orally or in writing, or both, as required by the order. A show cause order is not a final opinion and order.

§ 590.402 Conditional orders.

The Assistant Secretary may issue a conditional order at any time during a proceeding prior to issuance of a final opinion and order. The conditional order shall include the basis for not issuing a final opinion and order at that time and a statement of findings and conclusions. The findings and conclusions shall be based solely on the official record of the proceeding.

§ 590.403 Emergency interim orders.

Where consistent with the public interest, the Assistant Secretary may waive further procedures and issue an emergency interim order authorizing the import or export of natural gas. After issuance of the emergency interim order, the proceeding shall be continued until the record is complete, at which time a final opinion and order shall be issued. The Assistant Secretary may attach necessary or appropriate terms and conditions to the emergency interim order to ensure that the authorized action will be consistent with the public interest.

§ 590.404 Final opinions and orders.

The Assistant Secretary shall issue a final opinion and order and attach such conditions thereto as may be required by the public interest after completion and review of the record. The final opinion and order shall be based solely on the official record of the proceeding and include a statement of findings and conclusions, as well as the reasons or basis for them, and the appropriate order, condition, sanction, relief or denial.

§ 590.405 Transferability.

Authorizations by the Assistant Secretary to import or export natural gas shall not be transferable or assignable, unless specifically authorized by the Assistant Secretary.

§ 590.406 Compliance with orders.

Any person required or authorized to take any action by a final opinion and order of the Assistant Secretary shall file with FE, within thirty (30) days after the requirement or authorization becomes effective, a notice, under oath, that such requirement has been complied with or such authorization accepted or otherwise acted upon, unless otherwise specified in the order.

§ 590.407 Reports of changes.

Any person authorized to import or export natural gas has a continuing obligation to give the Assistant Secretary written notification, as soon as practicable, of any prospective or actual changes to the information submitted during the application process upon which the authorization was based, including, but not limited to, changes to: The parties involved in the import or export arrangement, the terms and conditions of any applicable contracts, the place of entry or exit, the transporters, the volumes accepted or offered, or the import or export price. Any notification filed under this section shall contain the FE docket number(s) to which it relates. Compliance with this section does not relieve an importer or exporter from responsibility to file the appropriate application to amend a previous import or export authorization under this part whenever such changes are contrary to or otherwise not permitted by the existing authorization.

Subpart E Applications for Rehearing
§ 590.501 Filing.

(a) An application for rehearing of a final opinion and order, conditional order, or emergency interim order may be filed by any party aggrieved by the issuance of such opinion and order within thirty (30) days after issuance. The application shall be served on all parties.

(b) The application shall state concisely the alleged errors in the final opinion and order, conditional order, or emergency interim order and must set forth specifically the ground or grounds upon which the application is based. If an order is sought to be vacated, reversed, or modified by reason of matters that have arisen since the issuance of the final opinion and order, conditional order, or emergency interim order, the matters relied upon shall be set forth with specificity in the application. The application shall also comply with the filing requirements of § 590.103.

§ 590.502 Application is not a stay.

The filing of an application for rehearing does not operate as a stay of the Assistant Secretary's order, unless specifically ordered by the Assistant Secretary.

§ 590.503 Opinion and order on rehearing.

Upon application for rehearing, the Assistant Secretary may grant or deny rehearing or may abrogate or modify the final opinion and order, conditional order, or emergency interim order with or without further proceedings.

§ 590.504 Denial by operation of law.

Unless the Assistant Secretary acts upon the application for rehearing within thirty (30) days after it is filed, it is deemed to be denied. Such denial shall constitute final agency action for the purpose of judicial review.

§ 590.505 Answers to applications for rehearing.

No answers to applications for rehearing shall be entertained. Prior to the issuance of any final opinion and order on rehearing, however, the Assistant Secretary may afford the parties an opportunity to file briefs or answers and may order that a conference, oral presentation, or trial-type hearing be held on some or all of the issues presented by an application for rehearing.

SUBCHAPTER H ASSISTANCE REGULATIONS

600 PART 600 [RESERVED]

PART 601 NEW RESTRICTIONS ON LOBBYING

Authority: 31 U.S.C. 1352; 42 U.S.C. 7254 and 7256; 31 U.S.C. 6301-6308; 28 U.S.C. 2461 note.

Source: 55 FR 6737, 6746, Feb. 26, 1990, unless otherwise noted.

Cross Reference: See also Office of Management and Budget notice published at 54 FR 52306, Dec. 20, 1989.

Subpart A General
§ 601.100 Conditions on use of funds.

(a) No appropriated funds may be expended by the recipient of a Federal contract, grant, loan, or cooperative ageement to pay any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any of the following covered Federal actions: the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

(b) Each person who requests or receives from an agency a Federal contract, grant, loan, or cooperative agreement shall file with that agency a certification, set forth in appendix A, that the person has not made, and will not make, any payment prohibited by paragraph (a) of this section.

(c) Each person who requests or receives from an agency a Federal contract, grant, loan, or a cooperative agreement shall file with that agency a disclosure form, set forth in appendix B, if such person has made or has agreed to make any payment using nonappropriated funds (to include profits from any covered Federal action), which would be prohibited under paragraph (a) of this section if paid for with appropriated funds.

(d) Each person who requests or receives from an agency a commitment providing for the United States to insure or guarantee a loan shall file with that agency a statement, set forth in appendix A, whether that person has made or has agreed to make any payment to influence or attempt to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with that loan insurance or guarantee.

(e) Each person who requests or receives from an agency a commitment providing for the United States to insure or guarantee a loan shall file with that agency a disclosure form, set forth in appendix B, if that person has made or has agreed to make any payment to influence or attempt to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with that loan insurance or guarantee.

§ 601.105 Definitions.

For purposes of this part:

(a) Agency, as defined in 5 U.S.C. 552(f), includes Federal executive departments and agencies as well as independent regulatory commissions and Government corporations, as defined in 31 U.S.C. 9101(1).

(b) Covered Federal action means any of the following Federal actions:

(1) The awarding of any Federal contract;

(2) The making of any Federal grant;

(3) The making of any Federal loan;

(4) The entering into of any cooperative agreement; and,

(5) The extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

Covered Federal action does not include receiving from an agency a commitment providing for the United States to insure or guarantee a loan. Loan guarantees and loan insurance are addressed independently within this part.

(c) Federal contract means an acquisition contract awarded by an agency, including those subject to the Federal Acquisition Regulation (FAR), and any other acquisition contract for real or personal property or services not subject to the FAR.

(d) Federal cooperative agreement means a cooperative agreement entered into by an agency.

(e) Federal grant means an award of financial assistance in the form of money, or property in lieu of money, by the Federal Government or a direct appropriation made by law to any person. The term does not include technical assistance which provides services instead of money, or other assistance in the form of revenue sharing, loans, loan guarantees, loan insurance, interest subsidies, insurance, or direct United States cash assistance to an individual.

(f) Federal loan means a loan made by an agency. The term does not include loan guarantee or loan insurance.

(g) Indian tribe and tribal organization have the meaning provided in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450B). Alaskan Natives are included under the definitions of Indian tribes in that Act.

(h) Influencing or attempting to influence means making, with the intent to influence, any communication to or appearance before an officer or employee or any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any covered Federal action.

(i) Loan guarantee and loan insurance means an agency's guarantee or insurance of a loan made by a person.

(j) Local government means a unit of government in a State and, if chartered, established, or otherwise recognized by a State for the performance of a governmental duty, including a local public authority, a special district, an intrastate district, a council of governments, a sponsor group representative organization, and any other instrumentality of a local government.

(k) Officer or employee of an agency includes the following individuals who are employed by an agency:

(1) An individual who is appointed to a position in the Government under title 5, U.S. Code, including a position under a temporary appointment;

(2) A member of the uniformed services as defined in section 101(3), title 37, U.S. Code;

(3) A special Government employee as defined in section 202, title 18, U.S. Code; and,

(4) An individual who is a member of a Federal advisory committee, as defined by the Federal Advisory Committee Act, title 5, U.S. Code appendix 2.

(l) Person means an individual, corporation, company, association, authority, firm, partnership, society, State, and local government, regardless of whether such entity is operated for profit or not for profit. This term excludes an Indian tribe, tribal organization, or any other Indian organization with respect to expenditures specifically permitted by other Federal law.

(m) Reasonable compensation means, with respect to a regularly employed officer or employee of any person, compensation that is consistent with the normal compensation for such officer or employee for work that is not furnished to, not funded by, or not furnished in cooperation with the Federal Government.

(n) Reasonable payment means, with respect to perfessional and other technical services, a payment in an amount that is consistent with the amount normally paid for such services in the private sector.

(o) Recipient includes all contractors, subcontractors at any tier, and subgrantees at any tier of the recipient of funds received in connection with a Federal contract, grant, loan, or cooperative agreement. The term excludes an Indian tribe, tribal organization, or any other Indian organization with respect to expenditures specifically permitted by other Federal law.

(p) Regularly employed means, with respect to an officer or employee of a person requesting or receiving a Federal contract, grant, loan, or cooperative agreement or a commitment providing for the United States to insure or guarantee a loan, an officer or employee who is employed by such person for at least 130 working days within one year immediately preceding the date of the submission that initiates agency consideration of such person for receipt of such contract, grant, loan, cooperative agreement, loan insurance commitment, or loan guarantee commitment. An officer or employee who is employed by such person for less than 130 working days within one year immediately preceding the date of the submission that initiates agency consideration of such person shall be considered to be regularly employed as soon as he or she is employed by such person for 130 working days.

(q) State means a State of the United States, the District of Columbia, the Commonwealth of Puerto Rico, a territory or possession of the United States, an agency or instrumentality of a State, and a multi-State, regional, or interstate entity having governmental duties and powers.

§ 601.110 Certification and disclosure.

(a) Each person shall file a certification, and a disclosure form, if required, with each submission that initiates agency consideration of such person for:

(1) Award of a Federal contract, grant, or cooperative agreement exceeding $100,000; or

(2) An award of a Federal loan or a commitment providing for the United States to insure or guarantee a loan exceeding $150,000.

(b) Each person shall file a certification, and a disclosure form, if required, upon receipt by such person of:

(1) A Federal contract, grant, or cooperative agreement exceeding $100,000; or

(2) A Federal loan or a commitment providing for the United States to insure or guarantee a loan exceeding $150,000,

unless such person previously filed a certification, and a disclosure form, if required, under paragraph (a) of this section.

(c) Each person shall file a disclosure form at the end of each calendar quarter in which there occurs any event that requires disclosure or that materially affects the accuracy of the information contained in any disclosure form previously filed by such person under paragraphs (a) or (b) of this section. An event that materially affects the accuracy of the information reported includes:

(1) A cumulative increase of $25,000 or more in the amount paid or expected to be paid for influencing or attempting to influence a covered Federal action; or

(2) A change in the person(s) or individual(s) influencing or attempting to influence a covered Federal action; or,

(3) A change in the officer(s), employee(s), or Member(s) contacted to influence or attempt to influence a covered Federal action.

(d) Any person who requests or receives from a person referred to in paragraphs (a) or (b) of this section:

(1) A subcontract exceeding $100,000 at any tier under a Federal contract;

(2) A subgrant, contract, or subcontract exceeding $100,000 at any tier under a Federal grant;

(3) A contract or subcontract exceeding $100,000 at any tier under a Federal loan exceeding $150,000; or,

(4) A contract or subcontract exceeding $100,000 at any tier under a Federal cooperative agreement,

shall file a certification, and a disclosure form, if required, to the next tier above.

(e) All disclosure forms, but not certifications, shall be forwarded from tier to tier until received by the person referred to in paragraphs (a) or (b) of this section. That person shall forward all disclosure forms to the agency.

(f) Any certification or disclosure form filed under paragraph (e) of this section shall be treated as a material representation of fact upon which all receiving tiers shall rely. All liability arising from an erroneous representation shall be borne solely by the tier filing that representation and shall not be shared by any tier to which the erroneous representation is forwarded. Submitting an erroneous certification or disclosure constitutes a failure to file the required certification or disclosure, respectively. If a person fails to file a required certification or disclosure, the United States may pursue all available remedies, including those authorized by section 1352, title 31, U.S. Code.

(g) For awards and commitments in process prior to December 23, 1989, but not made before that date, certifications shall be required at award or commitment, covering activities occurring between December 23, 1989, and the date of award or commitment. However, for awards and commitments in process prior to the December 23, 1989 effective date of these provisions, but not made before December 23, 1989, disclosure forms shall not be required at time of award or commitment but shall be filed within 30 days.

(h) No reporting is required for an activity paid for with appropriated funds if that activity is allowable under either subpart B or C.

Subpart B Activities by Own Employees
§ 601.200 Agency and legislative liaison.

(a) The prohibition on the use of appropriated funds, in § 601.100 (a), does not apply in the case of a payment of reasonable compensation made to an officer or employee of a person requesting or receiving a Federal contract, grant, loan, or cooperative agreement if the payment is for agency and legislative liaison activities not directly related to a covered Federal action.

(b) For purposes of paragraph (a) of this section, providing any information specifically requested by an agency or Congress is allowable at any time.

(c) For purposes of paragraph (a) of this section, the following agency and legislative liaison activities are allowable at any time only where they are not related to a specific solicitation for any covered Federal action:

(1) Discussing with an agency (including individual demonstrations) the qualities and characteristics of the person's products or services, conditions or terms of sale, and service capabilities; and,

(2) Technical discussions and other activities regarding the application or adaptation of the person's products or services for an agency's use.

(d) For purposes of paragraph (a) of this section, the following agencies and legislative liaison activities are allowable only where they are prior to formal solicitation of any covered Federal action:

(1) Providing any information not specifically requested but necessary for an agency to make an informed decision about initiation of a covered Federal action;

(2) Technical discussions regarding the preparation of an unsolicited proposal prior to its official submission; and,

(3) Capability presentations by persons seeking awards from an agency pursuant to the provisions of the Small Business Act, as amended by Public Law 95-507 and other subsequent amendments.

(e) Only those activities expressly authorized by this section are allowable under this section.

§ 601.205 Professional and technical services.

(a) The prohibition on the use of appropriated funds, in § 601.100 (a), does not apply in the case of a payment of reasonable compensation made to an officer or employee of a person requesting or receiving a Federal contract, grant, loan, or cooperative agreement or an extension, continuation, renewal, amendment, or modification of a Federal contract, grant, loan, or cooperative agreement if payment is for professional or technical services rendered directly in the preparation, submission, or negotiation of any bid, proposal, or application for that Federal contract, grant, loan, or cooperative agreement or for meeting requirements imposed by or pursuant to law as a condition for receiving that Federal contract, grant, loan, or cooperative agreement.

(b) For purposes of paragraph (a) of this section, “professional and technical services” shall be limited to advice and analysis directly applying any professional or technical discipline. For example, drafting of a legal document accompanying a bid or proposal by a lawyer is allowable. Similarly, technical advice provided by an engineer on the performance or operational capability of a piece of equipment rendered directly in the negotiation of a contract is allowable. However, communications with the intent to influence made by a professional (such as a licensed lawyer) or a technical person (such as a licensed accountant) are not allowable under this section unless they provide advice and analysis directly applying their professional or technical expertise and unless the advice or analysis is rendered directly and solely in the preparation, submission or negotiation of a covered Federal action. Thus, for example, communications with the intent to influence made by a lawyer that do not provide legal advice or analysis directly and solely related to the legal aspects of his or her client's proposal, but generally advocate one proposal over another are not allowable under this section because the lawyer is not providing professional legal services. Similarly, communications with the intent to influence made by an engineer providing an engineering analysis prior to the preparation or submission of a bid or proposal are not allowable under this section since the engineer is providing technical services but not directly in the preparation, submission or negotiation of a covered Federal action.

(c) Requirements imposed by or pursuant to law as a condition for receiving a covered Federal award include those required by law or regulation, or reasonably expected to be required by law or regulation, and any other requirements in the actual award documents.

(d) Only those services expressly authorized by this section are allowable under this section.

§ 601.210 Reporting.

No reporting is required with respect to payments of reasonable compensation made to regularly employed officers or employees of a person.

Subpart C Activities by Other Than Own Employees
§ 601.300 Professional and technical services.

(a) The prohibition on the use of appropriated funds, in § 601.100 (a), does not apply in the case of any reasonable payment to a person, other than an officer or employee of a person requesting or receiving a covered Federal action, if the payment is for professional or technical services rendered directly in the preparation, submission, or negotiation of any bid, proposal, or application for that Federal contract, grant, loan, or cooperative agreement or for meeting requirements imposed by or pursuant to law as a condition for receiving that Federal contract, grant, loan, or cooperative agreement.

(b) The reporting requirements in § 601.110 (a) and (b) regarding filing a disclosure form by each person, if required, shall not apply with respect to professional or technical services rendered directly in the preparation, submission, or negotiation of any commitment providing for the United States to insure or guarantee a loan.

(c) For purposes of paragraph (a) of this section, “professional and technical services” shall be limited to advice and analysis directly applying any professional or technical discipline. For example, drafting or a legal document accompanying a bid or proposal by a lawyer is allowable. Similarly, technical advice provided by an engineer on the performance or operational capability of a piece of equipment rendered directly in the negotiation of a contract is allowable. However, communications with the intent to influence made by a professional (such as a licensed lawyer) or a technical person (such as a licensed accountant) are not allowable under this section unless they provide advice and analysis directly applying their professional or technical expertise and unless the advice or analysis is rendered directly and solely in the preparation, submission or negotiation of a covered Federal action. Thus, for example, communications with the intent to influence made by a lawyer that do not provide legal advice or analysis directly and solely related to the legal aspects of his or her client's proposal, but generally advocate one proposal over another are not allowable under this section because the lawyer is not providing professional legal services. Similarly, communications with the intent to influence made by an engineer providing an engineering analysis prior to the preparation or submission of a bid or proposal are not allowable under this section since the engineer is providing technical services but not directly in the preparation, submission or negotiation of a covered Federal action.

(d) Requirements imposed by or pursuant to law as a condition for receiving a covered Federal award include those required by law or regulation, or reasonably expected to be required by law or regulation, and any other requirements in the actual award documents.

(e) Persons other than officers or employees of a person requesting or receiving a covered Federal action include consultants and trade associations.

(f) Only those services expressly authorized by this section are allowable under this section.

Subpart D Penalties and Enforcement
§ 601.400 Penalties.

(a) Any person who makes an expenditure prohibited by this part shall be subject to a civil penalty of not less than $25,132 and not more than $251,322 for each such expenditure.

(b) Any person who fails to file or amend the disclosure form (see appendix B to this part) to be filed or amended if required by this part, shall be subject to a civil penalty of not less than $25,132 and not more than $251,322 for each such failure.

(c) A filing or amended filing on or after the date on which an administrative action for the imposition of a civil penalty is commenced does not prevent the imposition of such civil penalty for a failure occurring before that date. An administrative action is commenced with respect to a failure when an investigating official determines in writing to commence an investigation of an allegation of such failure.

(d) In determining whether to impose a civil penalty, and the amount of any such penalty, by reason of a violation by any person, the agency shall consider the nature, circumstances, extent, and gravity of the violation, the effect on the ability of such person to continue in business, any prior violations by such person, the degree of culpability of such person, the ability of the person to pay the penalty, and such other matters as may be appropriate.

(e) First offenders under paragraph (a) or (b) of this section shall be subject to a civil penalty of $25,132, absent aggravating circumstances. Second and subsequent offenses by persons shall be subject to an appropriate civil penalty between $25,132 and $251,322, as determined by the agency head or his or her designee.

(f) An imposition of a civil penalty under this section does not prevent the United States from seeking any other remedy that may apply to the same conduct that is the basis for the imposition of such civil penalty.

[55 FR 6737, 6746, Feb. 26, 1990, as amended at 62 FR 46183, Sept. 2, 1997; 74 FR 66032, Dec. 14, 2009; 79 FR 19, Jan. 2, 2014; 81 FR 41794, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66083, Dec. 26, 2018; 85 FR 830, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2193, Jan. 13, 2023; 89 FR 1028, Jan. 9, 2024; 89 FR 105406, Dec. 27, 2024]

§ 601.405 Penalty procedures.

Agencies shall impose and collect civil penalties pursuant to the provisions of the Program Fraud and Civil Remedies Act, 31 U.S.C. 3803 (except subsection (c)), 3804, 3805, 3806, 3807, 3808, and 3812, insofar as these provisions are not inconsistent with the requirements herein.

§ 601.410 Enforcement.

The head of each agency shall take such actions as are necessary to ensure that the provisions herein are vigorously implemented and enforced in that agency.

Subpart E Exemptions
§ 601.500 Secretary of Defense.

(a) The Secretary of Defense may exempt, on a case-by-case basis, a covered Federal action from the prohibition whenever the Secretary determines, in writing, that such an exemption is in the national interest. The Secretary shall transmit a copy of each such written exemption to Congress immediately after making such a determination.

(b) The Department of Defense may issue supplemental regulations to implement paragraph (a) of this section.

Subpart F Agency Reports
§ 601.600 Semi-annual compilation.

(a) The head of each agency shall collect and compile the disclosure reports (see appendix B) and, on May 31 and November 30 of each year, submit to the Secretary of the Senate and the Clerk of the House of Representatives a report containing a compilation of the information contained in the disclosure reports received during the six-month period ending on March 31 or September 30, respectively, of that year.

(b) The report, including the compilation, shall be available for public inspection 30 days after receipt of the report by the Secretary and the Clerk.

(c) Information that involves intelligence matters shall be reported only to the Select Committee on Intelligence of the Senate, the Permanent Select Committee on Intelligence of the House of Representatives, and the Committees on Appropriations of the Senate and the House of Representatives in accordance with procedures agreed to by such committees. Such information shall not be available for public inspection.

(d) Information that is classified under Executive Order 12356 or any successor order shall be reported only to the Committee on Foreign Relations of the Senate and the Committee on Foreign Affairs of the House of Representatives or the Committees on Armed Services of the Senate and the House of Representatives (whichever such committees have jurisdiction of matters involving such information) and to the Committees on Appropriations of the Senate and the House of Representatives in accordance with procedures agreed to by such committees. Such information shall not be available for public inspection.

(e) The first semi-annual compilation shall be submitted on May 31, 1990, and shall contain a compilation of the disclosure reports received from December 23, 1989 to March 31, 1990.

(f) Major agencies, designated by the Office of Management and Budget (OMB), are required to provide machine-readable compilations to the Secretary of the Senate and the Clerk of the House of Representatives no later than with the compilations due on May 31, 1991. OMB shall provide detailed specifications in a memorandum to these agencies.

(g) Non-major agencies are requested to provide machine-readable compilations to the Secretary of the Senate and the Clerk of the House of Representatives.

(h) Agencies shall keep the originals of all disclosure reports in the official files of the agency.

§ 601.605 Inspector General report.

(a) The Inspector General, or other official as specified in paragraph (b) of this section, of each agency shall prepare and submit to Congress each year, commencing with submission of the President's Budget in 1991, an evaluation of the compliance of that agency with, and the effectiveness of, the requirements herein. The evaluation may include any recommended changes that may be necessary to strengthen or improve the requirements.

(b) In the case of an agency that does not have an Inspector General, the agency official comparable to an Inspector General shall prepare and submit the annual report, or, if there is no such comparable official, the head of the agency shall prepare and submit the annual report.

(c) The annual report shall be submitted at the same time the agency submits its annual budget justifications to Congress.

(d) The annual report shall include the following: All alleged violations relating to the agency's covered Federal actions during the year covered by the report, the actions taken by the head of the agency in the year covered by the report with respect to those alleged violations and alleged violations in previous years, and the amounts of civil penalties imposed by the agency in the year covered by the report.

Appendix A to Part 601 Certification Regarding Lobbying

Certification for Contracts, Grants, Loans, and Cooperative Agreements

The undersigned certifies, to the best of his or her knowledge and belief, that:

(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

(3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $25,132 and not more than $251,322 for each such failure.

Statement for Loan Guarantees and Loan Insurance

The undersigned states, to the best of his or her knowledge and belief, that:

If any funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this commitment providing for the United States to insure or guarantee a loan, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

Submission of this statement is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required statement shall be subject to a civil penalty of not less than $25,132 and not more than $251,322 for each such failure.

[55 FR 6737, 6746, Feb. 26, 1990, as amended at 62 FR 46184, Sept. 2, 1997; 74 FR 66032, Dec. 14, 2009; 79 FR 19, Jan. 2, 2014; 81 FR 41794, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66083, Dec. 26, 2018; 85 FR 830, Jan. 8 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2193, Jan. 13, 2023; 89 FR 1028, Jan. 9, 2024; 89 FR 105406, Dec. 27, 2024]

PART 602 EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM

Authority: 42 U.S.C. 2051; 42 U.S.C. 5817; 42 U.S.C. 5901-5920; 42 U.S.C. 7254 and 7256; 31 U.S.C. 6301-6308.

Source: 60 FR 5841, Jan. 31, 1995, unless otherwise noted.

§ 602.1 Purpose and scope.

This part sets forth the policies and procedures applicable to the award and administration of grants and cooperative agreements by DOE (through the Office of Environment, Health Safety and Security or any office to which its functions are subsequently redelegated) for health related research, education/training, conferences, communication, and related activities.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68729, Nov. 28, 2006; 79 FR 76046, Dec. 19, 2014; 80 FR 5007, Jan. 30, 2015]

§ 602.2 Applicability.

(a) This part applies to all grants and cooperative agreements awarded after the effective date of this rule.

(b) Except as otherwise provided by this part, the award and administration of grants and cooperative agreements shall be governed by 2 CFR part 200 as amended by 2 CFR part 910 (DOE Financial Assistance Regulation).

[60 FR 5841, Jan. 31, 1995, as amended at 79 FR 76046, Dec. 19, 2014]

§ 602.3 Definitions.

In addition to the definitions provided in 2 CFR part 200 and 2 CFR part 910, the following definitions are provided for purposes of this part:

Conference and communication activities means scientific or technical conferences, symposia, workshops, seminars, public meetings, publications, video or slide shows, and other presentations for the purpose of communicating or exchanging information or views pertinent to DOE.

DOE means the United States Department of Energy.

Education/Training means support for education or related activities for an individual or organization that will enhance educational levels and skills, in particular, scientific or technical areas of interest to DOE.

Epidemiology and Other Health Studies means research pertaining to potential health effects resulting from DOE or predecessor agency operations or from any aspect of energy production, transmission, or use (including electromagnetic fields) in the United States and abroad. Related systems or activities to enhance these areas, as well as other program areas that may be described by notice published in the Federal Register, are also included.

Principal investigator means the scientist or other individual designated by the recipient to direct the project.

Research means basic and applied research and that part of development not related to the development of specific systems or products. The primary aim of research is scientific study and experimentation directed toward advancing the state of the art or increasing knowledge or understanding rather than focusing on a specific system or product.

[60 FR 5841, Jan. 31, 1995, as amended at 79 FR 76046, Dec. 19, 2014]

§ 602.4 Exceptions.

(a) Single-case exceptions from this part may be authorized in writing by the Director, Office of Environment, Health, Safety and Security, the Head of the Contracting Activity, or their designees, upon the written request of DOE staff, an applicant for award, or a recipient. A request from an applicant or a recipient must be submitted to or through the cognizant contracting officer.

(b) Whenever a proposed deviation from this part would be a deviation from 2 CFR part 200 as amended by 2 CFR part 910, the deviation must also be authorized in accordance with the procedures prescribed in that part.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68729, Nov. 28, 2006; 79 FR 76046, Dec. 19, 2014; 80 FR 5007, Jan. 30, 2015; 88 FR 41292, June 26, 2023]

§ 602.5 Epidemiology and Other Health Studies Financial Assistance Program.

(a) DOE may issue under this part awards for research, education/training, conferences, communication, and related activities in the Office of Environment, Health, Safety and Security program areas set forth in paragraph (b) of this section.

(b) The program areas are:

(1) Health experience of DOE and DOE contractor workers;

(2) Health experience of populations living near DOE facilities;

(3) Workers exposed to toxic substances, such as beryllium;

(4) Use of biomarkers to recognize exposure to toxic substances;

(5) Epidemiology and other health studies relating to energy production, transmission, and use (including electromagnetic fields) in the United States and abroad;

(6) Compilation, documentation, management, use, and analysis of data for the DOE Comprehensive Epidemiologic Data Resource; and

(7) Other systems or activities enhancing these areas, as well as other program areas as may be described by notice published in the Federal Register.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68729, Nov. 28, 2006; 79 FR 76046, Dec. 19, 2014; 80 FR 5007, Jan. 30, 2015]

§ 602.6 Eligibility.

Any individual or entity other than a Federal agency is eligible for a grant or cooperative agreement. An unaffiliated individual is also eligible for a grant or cooperative agreement.

§ 602.7 Solicitation.

(a) The Catalog of Federal Domestic Assistance number for 10 CFR part 602 is 81.108 and its solicitation control number is EOHSFAP 10 CFR part 602.

(b) An application for a new or renewal award under this solicitation may be submitted at any time to DOE at the address specified in paragraph (c) of this section. New or renewal applications shall receive consideration for funding generally within 6 months but, in any event, no later than 12 months from the date of receipt by DOE.

(c) Except as otherwise provided in a notice of availability, applicants may obtain application forms, described in 602.8(b) of this part, and additional information from the Office of Domestic and International Health Studies, EHSS-13, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585, 301-903-2340, and shall submit applications to the same address.

(d) DOE will publish program notices in the Federal Register regarding the availability of epidemiology and other health studies financial assistance. DOE may also use other means of communication, as appropriate, such as the publication of notices of availability in trade and professional journals and news media.

(1) Each notice of availability shall cite this part and shall include:

(i) The Catalog of Federal Domestic Assistance number and solicitation control number of the program;

(ii) The amount of money available or estimated to be available for award;

(iii) The name of the responsible DOE program official to contact for additional information and an address where application forms may be obtained;

(iv) The address for submission of applications; and

(v) Any evaluation criteria in addition to those set forth in § 602.9 of this part.

(2) The notice of availability may also include any other relevant information helpful to applicants such as:

(i) Program objectives;

(ii) A project agenda or potential area of project initiatives;

(iii) Problem areas requiring additional effort; and

(iv) Any other information that identifies areas in which grants or cooperative agreements may be made.

(e) DOE is under no obligation to pay for any costs associated with the preparation or submission of applications.

(f) DOE reserves the right to fund, in whole or in part, any, all, or none of the applications submitted.

(g) To be considered for a renewal award under this part, an incumbent recipient shall submit a continuation or renewal application, as provided in § 602.8 (c) and (h) of this part.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68729, Nov. 28, 2006; 80 FR 5007, Jan. 30, 2015; 88 FR 41292, June 26, 2023]

§ 602.8 Application requirements.

(a) An original and seven copies of the application for initial support must be submitted, except that State and local governments and Indian tribal governments shall not be required to submit more than the original and two copies of the application.

(b) Each new or renewal application in response to this part must include:

(1) An application face page, DOE Form 4650.2 (approved by OMB under OMB Control No. 1910-1400). However, the face page of an application submitted by a State or local government or an Indian tribal government shall be the face page of Standard Form 424 (approved by OMB under OMB Control Number 0348-0043).

(2) A detailed description of the proposed project, including its objectives, its relationship to DOE's program, its impact on the environment, if any, and the applicant's plan for carrying it out.

(3) Detailed information about the background and experience of the recipients of funds or, as appropriate, the principal investigator(s) (including references to publications), the facilities and experience of the applicant, and the cost-sharing arrangements, if any.

(4) A detailed budget for the entire proposed period of support with written justification sufficient to evaluate the itemized list of costs provided on the entire project. Applicants should note the following when preparing budgets:

(i) Numerical details on items of cost provided by State and local government and Indian tribal government applicants shall be on Standard Form 424A, “Budget Information for Non-Construction Programs” (approved under OMB Control No. 0348-0044). All other applicants shall use budget forms ERF 4620.1 (approved by OMB under Control No. 1910-1400).

(ii) DOE may, subsequent to receipt of an application, request additional budgetary information from an applicant when necessary for clarification or make informed pre-award determinations under 2 CFR part 200 as amended by 2 CFR part 910.

(5) Any pre-award assurances required pursuant to 10 CFR parts 600 and 602.

(c) Applications for a renewal award must be submitted with an original and seven copies, except that State and local governments and Indian tribal government applicants are required to submit only an original and two copies (Approved by OMB under OMB Control Numbers 0348-00050348-0009)

(d) The application must be signed by an official who is authorized to act for the applicant organization and to commit the applicant to comply with the terms and conditions of the award, if one is issued, or if unaffiliated, by the individual applicant. (See § 602.17(a)(1) for requirements on continuation awards.)

(e) DOE may return an application that does not include all information and documentation required by statute, this part, 10 CFR part 600, or the notice of availability, when the nature of the omission precludes review of the application.

(f) During the review of a complete application, DOE may request the submission of additional information only if the information is essential to evaluate the application.

(g) In addition to including the information described in paragraphs (b), (c), and (d) of this section, an application for a renewal award must be submitted no later than 6 months before the expiration of the project period and must be on the same forms as required for initial applications. The renewal application must outline and justify a program and budget for the proposed project period, showing in detail the estimated cost of the proposed project, together with an indication of the amount of cost sharing, if any. The application shall also describe and explain the reasons for any change in the scope or objectives of the proposed project and shall compare and explain any difference between the estimates in the proposed budget and actual costs experienced as of the date of the application.

(h) DOE is not required to return an application to the applicant.

(i) Renewal applications must include a separate section that describes the results of work accomplished through the date of the renewal application and how such results relate to the activities proposed to be undertaken in the renewal period.

[60 FR 5841, Jan. 31, 1995, as amended at 79 FR 76046, Dec. 19, 2014]

§ 602.9 Application evaluation and selection.

(a) Applications shall be evaluated for funding generally within 6 months, but in any event no later than 12 months, from the date of receipt by DOE. After DOE has held an application for 6 months, the applicant may, in response to DOE's request, be required to revalidate the terms of the original application.

(b) DOE shall perform an initial evaluation of all applications to ensure that the information required by this part is provided, that the proposed effort is technically sound and feasible, and that the effort is consistent with program funding priorities. For applications that pass the initial evaluation, DOE shall review and evaluate each application received based on the criteria set forth below and in accordance with the Office of Environment, Health, Safety, and Security Merit Review System developed, as required, under DOE Financial Assistance Regulations, 2 CFR 200 as amended by 2 CFR 910.

(c) DOE shall select evaluators on the basis of their professional qualifications and expertise. To ensure credible and inclusive peer review of applications, every effort will be made to select evaluators apart from DOE employees and contractors. Evaluators shall be required to comply with all applicable DOE rules or directives concerning the use of outside evaluators.

(d) DOE shall evaluate new and renewal applications based on the following criteria that are listed in descending order of importance:

(1) The scientific and technical merit of the proposed research;

(2) The appropriateness of the proposed method or approach;

(3) Competency of research personnel and adequacy of proposed resources;

(4) Reasonableness and appropriateness of the proposed budget; and

(5) Other appropriate factors consistent with the purpose of this part established and set forth in a Notice of Availability or in a specific solicitation.

(e) DOE shall also consider as part of the evaluation other available advice or information, as well as program policy factors, such as ensuring an appropriate balance among the program areas listed in § 602.5 of this part.

(f) In addition to the evaluation criteria set forth in paragraphs (d) and (e) of this section, DOE shall consider the recipient's performance under the existing award during the evaluation of a renewal application.

(g) Selection of applications for award will be based upon the findings of the technical evaluations (including peer reviews, as specified in the Office of Environment, Health, Safety and Security Merit Review System), the importance and relevance of the proposal to the Office of Environment, Health, Safety and Security's mission, and the availability of funds. Cost reasonableness and realism will also be considered.

(h) After the selection of an application, DOE may, if necessary, enter into negotiations with an applicant. Such negotiations are not a commitment that DOE will make an award.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68729, Nov. 28, 2006; 79 FR 76046, Dec. 19, 2014; 80 FR 5007, Jan. 30, 2015]

§ 602.10 Additional requirements.

(a) A recipient performing research or related activities involving the use of human subjects must comply with DOE regulations in 10 CFR part 745, “Protection of Human Subjects,” and any additional provisions that may be included in the special terms and conditions of an award.

(b) A recipient performing research involving recombinant DNA molecules and/or organisms and viruses containing recombinant DNA molecules shall comply with the National Institutes of Health “Guidelines for Research Involving Recombinant DNA Molecules” (51 FR 16958, May 7, 1986), or such later revision of those guidelines, as may be published in the Federal Register. (The guidelines are available from the Office of Recombinant DNA Activities, National Institutes of Health, Building 31, Room BBB, Bethesda, MD 20892, or from the Office of Domestic and International Health Studies, EHSS-13, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585.

(c) A recipient performing research on warm-blooded animals shall comply with the Federal Laboratory Animal Welfare Act of 1966, as amended (7 U.S.C. 2131 et seq.), and the regulations promulgated thereunder by the Secretary of Agriculture at 9 CFR chapter I, subchapter A, pertaining to the care, handling, and treatment of warm-blooded animals held or used for research, teaching, or other activities supported by Federal awards. The recipient shall comply with the guidelines described in the Department of Health and Human Services Publication No. [NIH] 86-23, “Guide for the Care and Use of Laboratory Animals,” or succeeding revised editions. (This guide is available from the Office for Protection from Research Risks, Office of the Director, National Institutes of Health, Building 31, Room 4B09, Bethesda, MD 20892, or from the Office of Domestic and International Health Studies, EHSS-13, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68730, Nov. 28, 2006; 80 FR 5007, Jan. 30, 2015; 88 FR 41292, June 26, 2023]

§ 602.11 Funding.

(a) The project period during which DOE expects to provide support for an approved project under this part shall generally not exceed 3 years and may exceed 5 years only if DOE makes a renewal award or otherwise extends the award. The project period shall be specified on the Notice of Financial Assistance Grant (DOE Form 4600.1).

(b) Each budget period of an award under this part shall generally be 12 months and may be as much as 24 months, as DOE deems appropriate.

§ 602.12 Cost sharing.

Cost sharing is not required, nor will it be considered, as a criterion in the evaluation and selection process unless otherwise provided under § 602.9(d)(5).

§ 602.13 Limitation of DOE liability.

Awards made under this part are subject to the requirement that the maximum DOE obligation to the recipient is the amount shown in the Notice of Financial Assistance Award as the amount of DOE funds obligated. DOE shall not be obligated to make any additional, supplemental, continuation, renewal, or other award for the same or any other purpose.

§ 602.14 Fee.

(a) Notwithstanding 2 CFR part 200 as amended by 2 CFR part 910, a fee may be paid, in appropriate circumstances, to a recipient that is a small business concern, as qualified under the criteria and size standards of 13 CFR part 121, in order to permit the concern to participate in the Epidemiology and Other Health Studies Financial Assistance Program. Whether or not it is appropriate to pay a fee shall be determined by the contracting officer, who shall, at a minimum, apply the following guidelines:

(1) Whether the acceptance of an award will displace other work that the small business is currently engaged in or committed to assume in the near future; or

(2) Whether the acceptance of an award will, in the absence of paying a fee, cause substantial financial distress to the business. In evaluating financial distress, the contracting officer shall balance current displacement against reasonable future benefit to the company. (If the award will result in the beneficial expansion of the existing business base of the company, then no fee would generally be appropriate.) Fees shall not be paid to other entities except as a deviation from 2 CFR part 200 as amended by 2 CFR part 910, nor shall fees be paid under awards in support of conferences.

(b) To request a fee, a small business concern shall submit with its application a written self-certification that it is a small business concern qualified under the criteria and size standards in 13 CFR part 121. In addition, the application must state the amount of fee requested for the entire project period and the basis for requesting the amount and must also state why payment of a fee by DOE would be appropriate.

(c) If the contracting officer determines that payment of a fee is appropriate under paragraph (a) of this section, the amount of fee shall be that determined to be reasonable by the contracting officer. The contracting officer shall, at a minimum, apply the following guidelines in determining the fee amount:

(1) The fee base shall include the estimated allowable cost of direct salaries and wages and allocable fringe benefits. This fee base shall exclude all other direct and indirect costs.

(2) The fee amount expressed as a percentage of the appropriate fee base, pursuant to paragraph (c)(1) of this section, shall not exceed the percentage rate of fee that would result if a Federal agency contracted for the same amount of salaries, wages, and allocable fringe benefits under a cost reimbursement contract.

(3) Fee amounts, determined pursuant to paragraphs (c)(1) and (c)(2) of this section, shall be appropriately reduced when:

(i) Advance payments are provided; and/or

(ii) Title to property acquired with DOE funds vests in the recipient (2 CFR part 200 as amended by 2 CFR part 910).

(d) Notwithstanding 2 CFR part 200 as amended by 2 CFR part 910, any fee awarded shall be a fixed fee and shall be payable on an annual basis in proportion to the work completed, as determined by the contracting officer, upon satisfactory submission and acceptance by DOE of the progress report. If the project period is shortened due to termination, or the project period is not fully funded, the fee shall be reduced by an appropriate amount.

[60 FR 5841, Jan. 31, 1995, as amended at 79 FR 76046, Dec. 19, 2014]

§ 602.15 Indirect cost limitations.

Awards issued under this part for conferences and scientific/technical meetings will not include payment for indirect costs.

§ 602.16 National security.

Activities under the Epidemiology and Other Health Studies Financial Assistance Program are not expected to involve classified information (i.e., Restricted Data, Formerly Restricted Data, National Security Information). However, if in the opinion of the recipient or DOE such involvement becomes expected prior to the closeout of the award, the recipient or DOE shall notify the other in writing immediately. If the recipient believes any information developed or acquired may be classified, the recipient shall not provide the potentially classified information to anyone, including DOE officials with whom the recipient normally communicates, except the Director, Office of Classification, and shall protect such information as if it were classified until notified by DOE that a determination has been made that it does not require such handling. Correspondence that includes the specific information in question shall be sent by registered mail to the U.S. Department of Energy, Attn: Director, Office of Classification, EHSS-60, P.O. Box A, Germantown, MD 20875. If the information is determined to be classified, the recipient may wish to discontinue the project, in which case the recipient and DOE shall terminate the award by mutual agreement. If the award is to be terminated, all material deemed by DOE to be classified shall be forwarded to DOE in a manner specified by DOE for proper disposition. If the recipient and DOE wish to continue the award, even though classified information is involved, the recipient shall be requested to obtain both personnel and facility security clearances through the Office of Headquarters Security Operations awards or from the cognizant field office for awards obtained through DOE field organizations. Costs associated with handling and protecting any such classified information shall be negotiated at the time that the determination to proceed is made.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68730, Nov. 28, 2006; 80 FR 5008, Jan. 30, 2015; 88 FR 41292, June 26, 2023]

§ 602.17 Continuation funding and reporting requirements.

(a) A recipient shall periodically report to DOE on the project's progress in meeting the project objectives of the award. The following types of reports shall be used:

(1) Progress Reports. After issuance of an initial award, recipients must submit a satisfactory progress report to receive a continuation award for the remainder of the project period. The original and two copies of the required report must be submitted to the Office of Environment, Health, Safety and Security program manager 90 days prior to the anticipated continuation funding date. The report should include results of work to date and emphasize findings and their significance to the field, and any real or anticipated problems. The report also should contain the following information: On the first page, provide the project title, principal investigator/project director name, period of time the report covers, name and address of recipient organization, DOE award number, the amount of unexpended funds, if any, that are anticipated to be left at the end of the current budget period. If the amount exceeds 10 percent of the funds available for the budget period, provide information as to why the excess funds are anticipated to be available and how they will be used in the next budget period. The report should state whether the aims have changed from the original application, and if they have, provide revised aims. A completed budget page must be submitted with the continuation progress report when a change to anticipated future costs will exceed 25 percent of the original recommended future budget.

(2) Notice of Energy Research and Development (R&D) Project. A Notice of Energy R&D Project, DOE Form 1430.22, which summarizes the purpose and scope of the project, must be submitted in accordance with the Distribution and Schedule of Documents set forth in appendix A to this part, Schedule of Renewal Applications and Reports. Copies of the form may be obtained from a DOE contracting office.

(3) Special Reports. The recipient shall report the following events to DOE as soon after they occur as possible:

(i) Problems, delays, or adverse conditions that will materially affect the ability to attain project objectives or prevent the meeting of time schedules and goals. The report must describe remedial action that the recipient has taken, or plans to take, and any action DOE should take to alleviate the problems.

(ii) Favorable developments or events that enable meeting time schedules and goals sooner, or a lower cost than anticipated, or producing more beneficial results than originally projected.

(4) Final Report. A final report covering the entire project must be submitted by the recipient within 90 days after the project period ends or the award is terminated. Satisfactory completion of an award will be contingent upon the receipt of this report. The final report shall follow the same outline as progress reports. Recipients will provide, as part of the final report, a description of records and data compiled during the project, along with a plan for its preservation or disposition (see § 602.19 of this part). All manuscripts prepared for publication should be appended to the final report.

(5) Financial Status Report (FSR) (OMB No. 0348-0039). The FSR is required within 90 days after completion of each budget period. For budget periods exceeding 12 months, an FSR is also required within 90 days after this first 12 months unless waived by the contracting officer.

(b) DOE may extend the deadline date for any report if the recipient submits a written request before the deadline, that adequately justifies an extension.

(c) A table summarizing the various types of reports, time for submission, and number of copies is set forth in appendix A to this part. The schedule of reports shall be as prescribed in this table, unless the award document specifies otherwise. These reports shall be submitted by the recipient to the awarding office.

(d) DOE, or its authorized representatives, may make site visits, at any reasonable time, to review the project. DOE may provide such technical assistance as may be requested.

(e) Recipients may place performance reporting requirements on a subrecipient consistent with the provisions of this section.

[60 FR 5841, Jan. 31, 1995, as amended at 71 FR 68730, Nov. 28, 2006; 80 FR 5008, Jan. 30, 2015]

§ 602.18 Dissemination of results.

(a) Recipients are encouraged to disseminate research results promptly. DOE reserves the right to utilize, and have others utilize to the extent it deems appropriate, the reports resulting from research awards.

(b) DOE may waive the technical reporting requirement of progress reports set forth in § 602.17, if the recipient submits to DOE a copy of its own report that is published or accepted for publication in a recognized scientific or technical journal and that satisfies the information requirements of the program.

(c) Recipients are urged to publish results through normal publication channels.

(d) The article shall include an acknowledgement that the project was supported, in whole or in part, by a DOE award, and specify the award number, but state that such support does not constitute an endorsement by DOE of the views expressed in the article.

[60 FR 5841, Jan. 31, 1995, as amended at 79 FR 76046, Dec. 19, 2014]

§ 602.19 Records and data.

(a) In some cases, DOE will require submission of certain project records or data to facilitate mission-related activities. Recipients, therefore, must take adequate steps to ensure proper management, control, and preservation of all project records and data.

(b) Awardees must ensure that all project data is adequately documented. Documentation shall:

(1) Reference software used to compile, manage, and analyze data;

(2) Define all technical characteristics necessary for reading or processing the records;

(3) Define file and record content and codes;

(4) Describe update cycles or conditions and rules for adding or deleting information; and

(5) Detail instrument calibration effects, sampling and analysis, space and time coverage, quality control measures, data algorithms and reduction methods, and other activities relevant to data collection and assembly.

(c) Recipients agree to comply with designated DOE records and data management requirements, including providing electronic data in prescribed formats and retention of specified records and data for eventual transfer to the Comprehensive Epidemiologic Data Resource or to another repository, as directed by DOE. Recipients will provide, as part of the final report, a description of records and data compiled during the project along with a plan for its preservation or disposition.

(d) Recipients agree to make project records and data available as soon as possible when requested by DOE.

Appendix A to Part 602 Schedule of Renewal Applications and Reports

Type | When due | Number of copies for awarding office

1. Summary: 200 words on scope and purpose (Notice of Energy R&D Project) | Immediately after a grant is awarded and with each application for renewal | 3

2. Renewal period ends | 6 months before the budget | 8

3. Progress Report period (or as part of a renewal application) | 90 days prior to the next budget period | 3

4. Other progress reports, brief topical reports, etc. (Designated when significant results develop or when work has direct programmatic impact) | As deemed appropriate by DOE or the recipient | 3

5. Reprints, Conference | Same as 4. above | 3

6. Final report of the project | Within 90 days after completion | 3

7. Financial Status Report (FSR) | Within 90 days after completion of the project period; for budget periods exceeding 12 months an FSR is also required within 90 days after the first 12-month period | 3

Note: Report types 5 and 6 require with submission two copies of DOE Form 1332.16, University-Type Contractor and Grantee Recommendations for Disposition of Scientific and Technical Document.

603 PART 603 [RESERVED]

PART 605 THE OFFICE OF SCIENCE FINANCIAL ASSISTANCE PROGRAM

Authority: Section 31 of the Atomic Energy Act, as amended, Pub. L. 83-703, 68 Stat. 919 (42 U.S.C. 2051); sec. 107 of the Energy Reorganization Act of 1974, Pub. L. 93-438, 88 Stat. 1240 (42 U.S.C. 5817); Federal Nonnuclear Energy Research and Development Act of 1974, Pub. L. 93-577, 88 Stat. 1878 (42 U.S.C. 5901 et seq.); secs. 644 and 646 of the Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 599 (42 U.S.C. 7254 and 7256); Federal Grant and Cooperative Agreement Act, as amended (31 U.S.C. 6301 et seq.).

Source: 57 FR 40583, Sept. 3, 1992, unless otherwise noted.

§ 605.1 Purpose and scope.

This part sets forth the policies and procedures applicable to the award and administration of grants and cooperative agreements by the DOE Office of Science (SC) for basic and applied research, educational and/or training activities, conferences and related activities.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.2 Applicability.

(a) This part applies to all grants and cooperative agreements awarded after the effective date of this amended rule.

(b) Except as otherwise provided by this part, the award and administration of grants and cooperative agreements shall be governed by 2 CFR part 200 as amended by 2 CFR part 910 (DOE Financial Assistance Rules).

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.3 Definitions.

In addition to the definitions provided in 2 CFR part 200 as amended by 2 CFR part 910, the following definitions are provided for purposes of this part—

Basic and applied research means basic and applied research and that part of development not related to the development of specific systems or products. The primary aim of research is scientific study and experimentation directed toward advancing the state of the art or increasing knowledge or understanding rather than focusing on a specific system or product.

Educational/Training means support for education or related activities for an individual or organization that will enhance education levels and skills in particular scientific or technical areas of interest to DOE.

Principal investigator means the scientist or other individual designated by the recipient to direct the project.

Recipient obligation means the amounts of orders placed, contracts and subawards issued, services received, and similar transactions during a given period that will require payment by the recipient during the same or a future period.

Related conference means scientific or technical conferences, symposia, workshops or seminars for the purpose of communicating or exchanging information or views pertinent to SC.

Special purpose equipment means equipment which is used only for research, medical, scientific, educational, or other related project activity.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.4 Exceptions.

Single-case exceptions from this part may be authorized in writing by the Director or Deputy Director of SC or the Head of a Contracting Activity upon the written request of DOE staff, an applicant for an award, or a recipient. A request from an applicant or a recipient must be submitted to or through the cognizant contracting officer. Whenever a proposed exception from this part would be a exception from 2 CFR part 200 as amended by 2 CFR part 910, the exception must also be authorized in accordance with the procedures prescribed in that part.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.5 The Office of Science Financial Assistance Program.

(a) DOE may issue, under the Office of Science Financial Assistance Program, 10 CFR part 605, awards for basic and applied research, educational/training activities, conferences, and other related activities under the SC program areas set forth in paragraph (b) of this section and described in appendix A of this part.

(b) The Program areas are:

(1) Basic Energy Sciences

(2) Field Operations Management

(3) Fusion Energy

(4) Health and Environmental Research

(5) High Energy and Nuclear Physics

(6) Scientific Computing Staff

(7) Superconducting Super Collider

(8) University and Science Education Programs

(9) Program Analysis; and

(10) Other program areas of interest as may be described in a notice of availability published in the Federal Register.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.6 Eligibility.

Any university or other institution of higher education or other non-profit or for-profit organization, non-Federal agency, or entity is eligible for a grant or cooperative agreement. An unaffiliated individual also is eligible for a grant or cooperative agreement.

§ 605.7 [Reserved]
§ 605.8 Solicitation.

(a) The Catalog of Federal Domestic Assistance number for this program is 81.049, and its solicitation control number is ERFAP 10 CFR part 605.

(b) An application for a new or renewal award under this solicitation may be submitted at any time to DOE at the address specified in paragraph (c) of this section. New or renewal applications shall receive consideration for funding generally within 6 months but, in any event, no later than 12 months from the date of receipt by DOE.

(c) Applicants may obtain application forms, described in § 605.9(b), and additional information from the Acquisition and Assistance Management Division, Office of Science, SC, Department of Energy, Washington, DC 20585, (301) 903-5544, and shall submit applications to the same address.

(d) DOE shall publish annually, in the Federal Register, a notice of the availability of the Office of Science Financial Assistance Program. DOE shall also publish notices or abbreviated notices of availability in trade and professional journals, and news media, and use other means of communication, as appropriate.

(1) Each notice of availability shall cite this part and shall include:

(i) The Catalog of Federal Domestic Assistance number and solicitation control number of the program;

(ii) The amount of money available or estimated to be available for award;

(iii) The name of the responsible DOE program official to contact for additional information, and an address where application forms may be obtained;

(iv) The address for submission of applications; and

(v) Any evaluation criteria in addition to those set forth in § 605.10.

(2) The notice of availability may also include any other relevant information helpful to applicants such as:

(i) Program objectives,

(ii) A project agenda or potential areas for project initiatives,

(iii) Problem areas requiring additional effort, and

(iv) Any other information which identifies areas in which grants or cooperative agreements may be made.

(e) DOE is under no obligation to pay for any costs associated with the preparation or submission of applications.

(f) DOE reserves the right to fund, in whole or in part, any, all, or none of the applications submitted.

(g) To be considered for a renewal award under this part, an incumbent recipient shall submit a renewal application as provided in § 605.9 (c) and (h).

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.9 Application requirements.

(a) An original and seven copies of the application for initial support must be submitted except that State governments, local governments, or Indian tribal governments shall not be required to submit more than the original and two copies of the application.

(b) Each new or renewal application in response to this part must include:

(1) An application face page, DOE Form 4650.2 (approved by OMB under OMB Control No. 1910-1400). However, the facesheet of the application for State and local governments and Indian tribal government applicants shall be the facesheet of Standard Form (SF) 424 (approved by OMB under OMB Control Number 0348-0043).

(2) A detailed description of the proposed project, including the objectives of the project, in relationship to DOE's program and the applicant's plan for carrying it out;

(3) Detailed information about the background and experience of the principal investigator(s) (including references to publications), the facilities and experience of the applicant, and the cost-sharing arrangements, if any.

(4) A detailed budget for the entire proposed period of support with written justification sufficient to evaluate the itemized list of costs provided on the entire project.

(i) Numerical details on items of cost provided by State and local government and Indian tribal government applicants shall be on Standard Form 424A, Budget Information for Non-Construction Programs (approved under OMB Control No. 0348-0044). All other applicants shall use budget form ERF 4620.1 (approved by OMB under Control No. 1910-1400).

(ii) DOE may, subsequent to receipt of an application, request additional budgetary information from an applicant when necessary for clarification or to make informed preaward determinations under 2 CFR part 200 as amended by 2 CFR part 910.

(5) Any preaward assurances required pursuant to 2 CFR part 200 as amended by 2 CFR part 910.

(c) Applications for a renewal award must be submitted in an original and seven copies, except that State governments, local governments, or Indian tribes are required to submit only an original and two copies. (Approved by OMB under OMB Control Numbers 0348-0005—0348-0009)

(d) The application must be signed by an official who is authorized to act for the applicant organization and to commit the applicant to comply with the terms and conditions of the award, if one is issued, or if unaffiliated, by the individual applicant. (See § 605.19(a)(1) for requirements on continuation awards.)

(e) All applications which involve research, development, or demonstration activities when such activities:

(1) Have a unique geographic focus and are directly relevant to the governmental responsibilities of a State or local government within the geographic area;

(2) Necessitate the preparation of an Environmental Impact Statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq. (1976)); or

(3) Are to be initiated at a particular site or location and require unusual measures to limit the possibility of adverse exposure or hazard to the general public, are subject to the provisions of Executive Order 12372 and 10 CFR part 1005.

Anyone planning to submit such applications should contact ER for further information about compliance requirements.

(f) DOE may return an application which does not include all information and documentation required by statute, this part, 2 CFR part 200 as amended by 2 CFR part 910 or the notice of availability, when the nature of the omission precludes review of the application.

(g) During the review of the complete application, DOE may request the submission of additional information only if the information is essential to evaluate the application.

(h) In addition to including the information described in paragraphs (b), (c), and (d) of this section, an application for a renewal award must be submitted no later than six months prior to the scheduled expiration of the project period and must be on the same forms and include the same type of information as that required for initial applications. The renewal application must outline and justify a program and budget for the proposed project period, showing in detail the estimated cost of the proposed project, together with an indication of the amount of funds needed and the amount of cost sharing, if any. The application also shall describe and explain the reasons for any change in the scope or objectives of the proposed project, and shall compare and explain any difference between the estimates in the proposed budget and actual costs experienced as of the date of the application.

(i) DOE is not required to return to the applicant an application which is not selected or funded.

(j) Renewal applications must include a separate section that describes the results of work accomplished through the date of the renewal application and how such results relate to the activities proposed to be undertaken in the renewal period.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.10 Application evaluation and selection.

(a) Applications shall be evaluated for funding generally within 6 months but, in any event, no later than 12 months from the date of receipt by DOE. After DOE has held an application for 6 months, the applicant may, in response to DOE's request, be required to revalidate the terms of the original application.

(b) DOE staff shall perform an initial evaluation of all applications to ensure that the information required by this part is provided, that the proposed effort is technically sound and feasible, and that the effort is consistent with program funding priorities. For applications which pass the initial evaluation, DOE shall review and evaluate each application received based on the criteria set forth below and in accordance with the Merit Review System developed as required under DOE Financial Assistance Regulations, 2 CFR part 200 as amended by 2 CFR part 910.

(c) DOE shall select evaluators on the basis of their professional qualifications and expertise. Evaluators shall be required to comply with all applicable DOE rules or directives concerning the use of outside evaluators.

(d) DOE shall evaluate new and renewal applications based on the following criteria which are listed in descending order of importance:

(1) Scientific and/or technical merit or the educational benefits of the project;

(2) Appropriateness of the proposed method or approach;

(3) Competency of applicant's personnel and adequacy of proposed resources;

(4) Reasonableness and appropriateness of the proposed budget; and

(5) Other appropriate factors established and set forth by ER in a notice of availability or in a specific solicitation.

(e) Also, DOE shall consider, as part of the evaluation, other available advice or information as well as program policy factors such as ensuring an appropriate balance among the program areas listed in § 605.5(b) of this part.

(f) In addition to the evaluation criteria set forth in paragraphs (d) and (e) of this section, DOE shall consider the recipient's performance under the existing award during the evaluation of a renewal application.

(g) Selection of applications for award will be based upon the findings of the technical evaluations, the importance and relevance of the proposed application to SC's mission, and fund availability. Cost reasonableness and realism will also be considered to the extent appropriate.

(h) After the selection of an application, DOE may, if necessary, enter into negotiation with an applicant. Such negotiations are not a commitment that DOE will make an award.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76046, Dec. 19, 2014]

§ 605.11 Additional requirements.

(a) A recipient performing research, development, or related activities involving the use of human subjects must comply with DOE regulations in 10 CFR part 745, “Protection of Human Subjects,” and any additional provisions which may be included in the Special Terms and Conditions of an award.

(b) A recipient performing research involving recombinant DNA molecules and/or organisms and viruses containing recombinant DNA molecules shall comply with the National Institutes of Health “Guidelines for Research Involving Recombinant DNA Molecules” (51 FR 16958, May 7, 1986), or such later revision of those guidelines as may be published in the Federal Register. (The guidelines are available from the Office of Recombinant DNA Activities, National Institutes of Health, Building 31, room 4B11, Bethesda, Maryland 20892.)

(c) Any recipient performing research on warm-blooded animals shall comply with the Federal Laboratory Animal Welfare Act of 1966, as amended (7 U.S.C. 2131 et seq.) and the regulations promulgated thereunder by the Secretary of Agriculture at 9 CFR chapter I, subchapter A, pertaining to the care, handling, and treatment of warm blooded animals held or used for research, teaching, or other activities supported by Federal awards. The recipient shall comply with the guidelines described in DHHS Publication No. [NIH] 86-23, “Guide for the Care and Use of Laboratory Animals,” or succeeding revised editions. (This guide is available from the Office for Protection from Research Risks, Office of the Director, National Institutes of Health, Building 31, room 4B09, Bethesda, Maryland 20205.)

§ 605.12 Funding.

(a) The project period during which DOE expects to provide support for an approved project under this part shall generally not exceed 3 years and may exceed 5 years only if DOE makes a renewal award or otherwise extends the award. The project period shall be specified on the Notice of Financial Assistance Award (DOE Form 4600.1).

(b) Each budget period, of an award under this part, shall generally be 12 months and may be as much as 24 months as determined appropriate by SC.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76047, Dec. 19, 2014]

§ 605.13 Cost sharing.

Cost sharing is not required nor will it be considered as a criterion in the evaluation and selection process unless otherwise provided under § 605.10(d)(5).

§ 605.14 Limitation of DOE liability.

Awards under this part are subject to the requirement that the maximum DOE obligation to the recipient is the amount shown in the Notice of Financial Assistance Award as the amount of DOE funds obligated. DOE shall not be obligated to make any additional, supplemental, continuation, renewal or other awards for the same or any other purpose.

§ 605.15 Fee.

(a) Notwithstanding 2 CFR part 200 as amended by 2 CFR part 910, a fee may be paid, in appropriate circumstances, to a recipient which is a small business concern as qualified under the criteria and size standards of 13 CFR part 121 in order to permit the concern to participate in the ER Financial Assistance Program. Whether or not it is appropriate to pay a fee shall be determined by the Contracting Officer who shall, at a minimum, apply the following guidelines:

(1) Whether the acceptance of an award will displace other work the small business is currently engaged in or committed to assume in the near future; or

(2) Whether the acceptance of an award will, in the absence of paying a fee, cause substantial financial distress to the business. In evaluating financial distress, the Contracting Officer shall balance current displacement against reasonable future benefit to the company. (If the award will result in the beneficial expansion of the existing business base of the company, then no fee would generally be appropriate.) Fees shall not be paid to other entities except as a exceptionfrom 2 CFR part 200 as amended by 2 CFR part 910, nor shall fees be paid under awards in support of conferences.

(b) To request a fee, a small business concern shall submit with its application a written self certification that it is a small business concern qualified under the criteria and size standards in 13 CFR part 121. In addition, the application must state the amount of fee requested for the entire project period and the basis for requesting the amount, and must also state why payment of a fee by DOE would be appropriate.

(c) If the Contracting Officer determines that payment of a fee is appropriate under paragraph (a) of this section, the amount of fee shall be that determined to be reasonable by the Contracting Officer. The Contracting Officer shall, at a minimum, apply the following guidelines in determining the fee amount:

(1) The fee base shall include the estimated allowable cost of direct salaries and wages and allocable fringe benefits. This fee base shall exclude all other direct and indirect costs.

(2) The fee amount expressed as a percentage of the appropriate fee base pursuant to paragraph (c)(1) of this section, shall not exceed the percentage rate of fee that would result if a Federal agency contracted for the same amount of salaries, wages, and allocable fringe benefits under a cost reimbursement contract.

(3) Fee amounts, determined pursuant to paragraphs (c)(1) and (c)(2) of this section, shall be appropriately reduced when:

(i) Advance payments are provided; and/or

(ii) Title to property acquired with DOE funds vests in the recipient (10 CFR part 600).

(d) Notwithstanding 2 CFR part 200 as amended by 2 CFR part 910, any fee awarded shall be a fixed fee and shall be payable on an annual basis in proportion to the work completed, as determined by the Contracting Officer, upon satisfactory submission and acceptance by DOE of the progress report. If the project period is shortened due to termination, or the project period is not fully funded, the fee shall be reduced by an appropriate amount.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76047, Dec. 19, 2014]

§ 605.16 Indirect cost limitations.

Awards issued under this part for conferences and scientific/technical meetings will not include payment for indirect costs.

§ 605.17 [Reserved]
§ 605.18 National security.

Activities under SC's Financial Assistance Program shall not involve classified information (i.e., Restricted Data, formerly Restricted Data, National Security Information). However, if in the opinion of the recipient or DOE such involvement becomes expected prior to the closeout of the award, the recipient or DOE shall notify the other in writing immediately. If the recipient believes any information developed or acquired may be classifiable, the recipient shall not provide the potentially classifiable information to anyone, including the DOE officials with whom the recipient normally communicates, except the Director of Classification, and shall protect such information as if it were classified until notified by DOE that a determination has been made that it does not require such handling. Correspondence which includes the specific information in question shall be sent by registered mail to U.S. Department of Energy, Attn: Director of Classification, DP-32, Washington, DC 20585. If the information is determined to be classified, the recipient may wish to discontinue the project in which case the recipient and DOE shall terminate the award by mutual agreement. If the award is to be terminated, all material deemed by DOE to be classified shall be forwarded to DOE, in a manner specified by DOE, for proper disposition. If the recipient and DOE wish to continue the award, even though classified information is involved, the recipient shall be required to obtain both personnel and facility security clearances through the Office of Safeguards and Security for Headquarters awards, or from the cognizant field office Division of Safeguards and Security for awards obtained through DOE field organizations. Costs associated with handling and protecting any such classified information shall be negotiated at the time that the determination to proceed is made.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76047, Dec. 19, 2014]

§ 605.19 Continuation funding and reporting requirements.

(a) A recipient shall periodically report to DOE on the project's progress in meeting the project objectives of the award. The following types of reports shall be used:

(1) Progress reports. After issuance of an initial award and if future support is recommended, recipients must submit a satisfactory progress report in order to receive continuation awards for the remainder of the project period. The original and two copies of the required report (generally not to exceed two pages per project or task) must be submitted to the SC program manager 90 days prior to the anticipated continuation funding date and contain the following information: on the first page, provide the project title, principal investigator/project director name, period of time report covers, name and address of recipient organization, DOE award number, the amount of unexpended funds, if any, that are anticipated to be left at the end of the current budget period, and if the amount exceeds 10 percent of the funds available for the budget period, provide information as to why the excess funds are anticipated to be available and how they will be used in the next budget period. Report should state whether aims have changed from original application and if they have, provided revised aims. Include results of work to date. Emphasize findings and their significance to the field, and any real or anticipated problems. A completed budget page must be submitted with the continuation progress report when a change to anticipated future costs will exceed 25 percent of the original recommended future budget.

(2) Notice of Energy R&D Project. A Notice of Energy R&D Project, DOE Form 1430.22, which summarizes the purpose and scope of the project, must be submitted in accordance with the Distribution and Schedule of Documents set forth at the end of this section. Copies of the form may be obtained from a DOE Contracting Office.

(3) Special reports. The recipient shall report the following events to DOE as soon after they occur as possible:

(i) Problems, delays, or adverse conditions which will materially affect the ability to attain project objectives, or prevent the meeting of time schedules and goals. The report must describe the remedial action the recipient has taken or plans to take and any action DOE should take to alleviate the problems.

(ii) Favorable developments or events which enable meeting time schedules and goals sooner or at less cost than anticipated or producing more beneficial results than originally projected.

(4) Final report. A final report summarizing the entire investigation must be submitted by the recipient within 90 days after the final project period ends or the award is terminated. Satisfactory completion of an award will be contingent upon the receipt of this report. The final report shall follow the same outline as a progress report. Manuscripts prepared for publication should be appended.

(5) Financial status report (FSR) (OMB No. 0348-0039). The FSR is required within 90 days after completion of each budget period; for budget periods exceeding 12 months, an FSR is also required within 90 days after this first 12 months unless waived by the Contracting Officer.

(b) DOE may extend the deadline date for any report if the recipient submits a written request before the deadline which adequately justifies an extension.

(c) A table summarizing the various types of reports, time for submission, number of copies is set forth below. The schedule of reports shall be as prescribed in this table, unless the award document specifies otherwise.

(d) DOE review of performance. DOE or its authorized representatives may make site visits, at any reasonable time, to review the project. DOE may provide such technical assistance as may be requested.

(e) Subrecipient progress reporting. Recipients may place progress reporting requirements on a subrecipient consistent with the provisions of this section.

Distribution and Schedule of Documents

Type | When due | Number of copies to be submitted

1. Summary: 200 words on scope and purpose (Notice of Energy R&D Project) | Immediately after award and with each application for renewal | 3

2. Renewal | 6 months before the project period ends | 8

3. Progress Report | 90 days prior to the next budget period (or as part of a renewal application) | 3

4. Other progress reports, brief topical reports, etc. (Designated when significant results develop or when work has direct programmatic impact) | As deemed appropriate by the recipient | 3

5. Reprints, Conference papers | Same as 4 above | 3

6. Final Report | Within 90 days after termination of the project | 3

7. Financial Status Report. (FSR) | Within 90 days after completion of the project period; for budget periods exceeding 12 months an FSR is also required within 90 days after the first 12-month period | 3

Note: Report types 5 and 6 require with submission two copies of DOE Form 1332.16, University-Type Contractor and Grantee Recommendations for Disposition of Scientific and Technical Document.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76047, Dec. 19, 2014]

§ 605.20 Dissemination of results.

(a) Recipients are encouraged to disseminate project results promptly. DOE reserves the right to utilize, and have others utilize, to the extent it deems appropriate, the reports resulting from awards.

(b) DOE may waive progress reporting requirements set forth in § 605.19, if the recipient submits to DOE a copy of its own report which is published or accepted for publication in a recognized scientific or technical journal and which satisfies the information requirements of the program.

(c) Recipients are urged to publish results through normal publication channels in accordance with the applicable provisions of 2 CFR part 200 as amended by 2 CFR part 910.

(d) The article shall include an acknowledgment that the project was supported, in whole or in part, by a DOE award, and specify the award number, but state that such support does not constitute an endorsement by DOE of the views expressed in the article.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76047, Dec. 19, 2014]

Appendix A to Part 605 The Energy Research Program Office Descriptions

1. Basic Energy Sciences

This program supports basic science research efforts in a variety of disciplines to broaden the energy supply and technological base knowledge. The major science division and its objectives are as follows:

(a) Energy Biosciences

The primary objective of this program is to generate a basis of understanding of fundamental biological mechanisms in the areas of botanical and microbiological sciences that will support biotechnology development related to energy. The research serves as the basic information foundation with respect to renewable resource productivity for fuels and chemicals, microbial conversions or renewable materials and biological systems for the conservation of energy. This office has special requirements on the submission of preapplications, when to submit, and the length of the preapplication/application; applicants are encouraged to contact the office regarding these requirements.

(b) Chemical Sciences

This program sponsors experimental and theoretical research on liquids, gases, plasmas, and solids. The focus is on their chemical properties and the interactions of their component molecules, atoms, ions, and electrons. The subprogram objective is to expand, through support of basic research, our knowledge in the various areas of chemistry; the long-term goal is to contribute to new or improved processes for developing and using domestic energy resources in an efficient and environmentally sound manner. Disciplinary areas covered include physical, organic, and inorganic chemistry; chemical physics; atomic physics; photochemistry; radiation chemistry; thermodynamics; thermophysics; separations science; analytical chemistry; and actinide chemistry.

(c) Geosciences

The goal of this program is to develop a quantitative and predictive understanding of the energy-related aspects of processes within the earth and at the solar-terrestrial interface. The emphasis is on the upper levels of the earth's crust and the focus is on geophysics and geochemistry of rock-fluid systems and interactions. Specific topical areas receiving emphasis include: High resolution geophysical imaging; fundamental properties of rocks, minerals, and fluids; scientific drilling; and sedimentary basin systems. The resulting improved understanding and knowledge base are needed to assist efforts in the utilization of the Nation's energy resources in an environmentally acceptable fashion.

(d) Engineering Research

This program's objectives are: (1) To extend the body of knowledge underlying current engineering practice in order to open new ways for enhancing energy savings and production, prolonging useful equipment life, and reducing costs while maintaining output and performance quality; and (2) to broaden the technical and conceptual base for solving future engineering problems in the energy technologies. Long-term research topics of current interest include: foundations of bioprocessing of fuels and energy related wastes, fracture mechanics, experimental and theoretical studies of multiphase flows, intelligent machines, and diagnostics and control for plasma processing of materials.

(e) Materials Sciences

The objective of this program is to increase the understanding of phenomena and properties important to materials behavior that will contribute to meeting the needs of present and future energy technologies. It is comprised of the subfields metallurgy, ceramics, solid state physics, materials chemistry, and related disciplines where the emphasis is on the science of materials.

(f) Advanced Energy Projects

The objective of this program is to support exploratory research on novel concepts related to energy. The concepts may be in any field related to energy but must not fall into an area of programmatic responsibility of an existing ER technical program. The research is usually aimed at establishing the scientific feasibility of a concept and, where appropriate, at estimating its economic viability.

2. Field Operations Management

This office administers special purpose support programs that cut across DOE program areas. In conjunction with this activity, it supports related conferences, research, and training initiatives that further these areas of interest.

(a) Laboratory Technology Transfer Program

The SC Laboratory Technology Transfer (LTT) Program has dedicated funding which fulfills the legislative mandate to more effectively transfer research and technology from Science laboratories to industry. By design, this program provides only partial funding for technology research projects and personnel exchanges with industry and universities. Mandatory cost-sharing by industry and other partners ensures that cooperative projects will focus on those that generate real interest in the private sector and facilitate the transfer of technology. The program supports laboratory-industry personnel exchanges; comprehensive program evaluation; and cost-shared technology research, especially CRADAs to advance precompetitive research projects to a point where they can be evaluated for commercial applications. Other activities of the SC Laboratory Technology Transfer Program include coordinating technology transfer operations throughout the SC laboratory system; coordinating technology transfer elements of the institutional planning process; contributing to Departmental technology transfer policy development; and implementing appropriate outreach activities.

3. Fusion Energy

The magnetic fusion energy program is an applied research and development program whose goal is to develop the scientific and technological information required to design and construct magnetic fusion energy systems. This goal is pursued by three divisions, whose major functions are listed below.

(a) Applied Plasma Physics (APP)

This Division seeks to develop that body of physics knowledge which permits advancement of the fusion program on a sound basis. APP research programs provide: (1) The theoretical understanding of fusion plasmas necessary for interpreting results from present experiments, and the planning and design of future confinement devices; (2) the data on plasma properties, atomic physics and new diagnostic techniques for operational support of confinement experiments; research and development of Heavy Ion Fusion Accelerator (HIFAR) and reactor studies in support of the development of Inertial Fusion Energy (IFE).

(b) Confinement Systems

This Division has as its primary objective the conduct of research efforts to investigate and resolve basic physics issues associated with medium- to large-scale confinement devices. These devices are used to experimentally explore the limits of specific confinement concepts as well as to study associated physical phenomena. Specific areas of interest include: the production of increased plasma densities and temperatures; the understanding of the physical laws governing plasma energy transport and confinement scaling; equilibrium and stability of high plasma pressure; the investigation of plasma interaction with radio-frequency waves; and the study and control of particle transport in the plasma.

(c) Development and Technology

This Division supports research and development of the technology necessary for fabrication and operation of present and future plasma and fusion devices. The program also pursues R&D and system studies pertaining to critical feasibility issues of fusion technology and development.

4. Health and Environmental Research

The goals of this research program are as follows: (1) To provide, through basic and applied research, the scientific information required to identify, understand and anticipate the long-term health and environmental consequences of energy use and development; and (2) to utilize the Department's unique resources to solve major scientific problems in medicine, biology and the environment. The goals of the program are accomplished through the effort of its divisions, which are:

(a) Health Effects and Life Sciences Research

This is a broad program of basic and applied biological research. The objectives are: (1) To develop experimental information from biological systems for estimating or predicting risks of carcinogenesis, mutagenesis, and delayed toxicological effects associated with low level human exposures to energy-related radiations and chemicals; (2) to define mechanisms involved in the induction of biological damage following exposure to low levels of energy-related agents; (3) to develop new technologies for detecting and quantifying latent health effects associated with such agents; (4) to support fundamental research in structural biology user facilities at DOE laboratories; and (5) to create and apply new technologies and resources for characterizing the molecular nature of the human genome.

Increasing emphasis will be placed on: Understanding of mechanisms by which low level exposures to radiation and/or energy-related chemicals produce long-term health impacts; development of new technologies for estimating human health risks from low level exposures; development and application of technologies and approaches for cost-effective characterization of the human genome.

(b) Medical Applications and Biophysical Research

The objectives of this program comprise several areas: (1) To develop new concepts and techniques for detecting and measuring hazardous physical and chemical agents related to energy production; (2) to evaluate chemical and radiation exposures and dosimetry for health protection application; (3) to determine the physical and chemical mechanisms of radiation action in biological systems; and (4) to develop new instrumentation and technology for biological and biomedical research. In addition, Medical Application research is aimed at enhancing the beneficial applications of radiation, and radionuclides, in the diagnosis, study, and treatment of human diseases. This includes the development of new techniques for radioactive isotope production, labeled pharmaceuticals, imaging devices, and radiation beam applications for the improved diagnosis and therapy of human diseases or the study of human physiological processes. A new area of interest involves the integration of Nuclear Medicine and Molecular Biology. This includes development of radioisotopes and new molecular radiopharmaceutical probes specific to disease-associated targets for improved diagnosis and therapy.

(c) Environmental Sciences

The objectives of the program relate to environmental processes affected by energy production and use. For example, the program develops information on the physical, chemical and biological processes that cycle and transport energy related material and nutrients through the atmosphere, and the ocean margin. Specific emphasis is placed on hydrological transport, mobility and degradation of energy-related contaminants by microorganisms in subsurface systems.

This program also addresses global environmental change from increases in atmospheric carbon dioxide and other greenhouse gases. The scope of the global change program encompasses the carbon cycle, climate modeling and diagnostics, ecosystem responses, the role of the ocean in global change and experiments to quantify the links between greenhouse gas increases and climate change. A new dimension of this program addresses the role of molecular biology in understanding the ecosystem response to global change.

5. High Energy and Nuclear Physics

This program supports 90 percent of the U.S. efforts in high energy and nuclear physics. The objectives of these programs are indicated below:

(a) Nuclear Physics (Including Nuclear Data Program)

The primary objectives of this program are an understanding of the interactions and structures of atomic nuclei and nuclear matter at the most elementary level possible, and an understanding of the fundamental forces of nature as manifested in nuclear matter.

(b) High Energy Physics

The primary objectives of this program are to understand the nature and relationships among fundamental forces of nature and to understand the ultimate structure of matter in terms of the properties and interrelations of its basic constituents.

6. Scientific Computing Staff

The goal of this program is to advance the understanding of the fundamental concepts of mathematics, statistics, and computer science underlying the complex mathematical models of the key physical processes involved in the research and development programs of DOE. Broad emphasis is given in three major categories: analytical and numerical methods, information analysis techniques, and advanced concepts.

7. Superconducting Super Collider (SSC)

The goals of the Superconducting Super Collider are to build a proton-proton collider with an energy of 20 TeV per proton, to construct and operate experimental systems to study the interactions of these protons, to establish the premier international laboratory for high energy physics reasearch, and to create a major resource for science education. The Office of the Superconducting Super Collider administers research grants associated with the SSC Laboratory's physics, accelerator, and associated technology research and development programs.

8. University and Science Education

The Office of University and Science Education supports a variety of science, mathematics and engineering education precollege through postgraduate programs aimed at strengthening the Nation's science education and research infrastructure. DOE's education mission has been expanded to include increasing emphasis on the precollege and general public literacy areas. Much of the support involves the use of the unique resources (scientists, facilities and equipment) at DOE's national laboratories and research facilities, and includes research and/or other “hands-on” opportunities for precollege and postsecondary students, teachers, and faculty members. In addition to programs centered in DOE facilities, a number of other educational activities are supported, including:

(a) Pre-Freshman Enrichment Program (PREP)

PREP supports projects at colleges and universities aimed at seeking out gindividuals, typically under-represented in science-based careers, during junior high school and early high school years (sixth through tenth grades) and providing these individuals with pre-freshman enrichment activities to identify, motivate and prepare them for science-based careers. Projects must include concentrated, integrated activities that enhance the student's understanding of science and mathematics, must have a summer component at least four weeks in length, and may also include a pre-summer or post-summer component.

(b) Museum Science Education Program

This program funds museum projects that support the development of the media of informal energy-related science education. The media of informal science education include, but are not limited to: Interactive exhibits, demonstrations, hands-on activities, teacher-student curriculum and film/video/software productions. Examples of energy-related subjects include, but are not limited to: high energy and nuclear physics, nuclear science and technologies, global warming, waste management, energy efficiency, new materials development, fossil energy resources, renewable technologies, risk assessment, energy/environment and other timely topics. The purpose of the program is the development and use of creative informal science education media which focus on energy-related science and technology.

(c) University Research Instrumentation Program

The University Research Instrumentation Program has been developed as part of an interagency effort under the coordination of the Office of Science and Technology Policy to help alleviate the overall shortage of sophisticated state-of-the-art instruments required for advanced scientific and technical research at universities. The overall program objective is to assist university and college scientists in strengthening their capabilities to conduct long-range experimental/scientific research in specific energy areas of direct interest to DOE through the acquisition of large scientific/technical pieces of equipment. Only those colleges and universities that currently have DOE funded research projects, which require the requested equipment, totalling at least $150,000 in the specific area will be selected (more complete eligibility guidelines and principal research areas of particular DOE interest in any given year are available from the program office). Smaller research instruments (less than $100,000 each) are not eligible for consideration in this program. No specific fraction of cost sharing is required but the level of non-Federal funds to be provided will be considered in final selection of awards under the program.

(d) Experimental Program To Stimulate Competitive Research

The purpose of the DOE Experimental Program to Stimulate Competitive Research is to enhance the capabilities of the eligible designated States to develop science and engineering manpower in energy-related areas and to conduct nationally competitive energy-related research. Planning committees within eligible States may apply for planning, implementation and/or training efforts (list of eligible States and activities to be supported in any given year as well as cost-sharing requirements are available from the program office). Separate applications for planning/implementation and graduate traineeships are required. Planning/implementation applications must contain information that details development of a State-wide improvement plan for energy-related research and human resources, while training grant applications must detail the need for energy-related specific and technical educational disciplines.

(e) Nuclear Engineering Research

The objective of this program is to support research efforts aimed at strengthening University-based nuclear engineering programs. Specific areas of basic and applied research of interest include, but are not limited to: (1) Material behavior in a radiation environment typical of advanced nuclear power plants; (2) real-time instrumentation that identifies and applies innovative measurements technologies in nuclear-related fields; (3) advanced nuclear reactor concepts; (4) applied nuclear sciences that address improvements in the applications of radiation and the understanding of the interaction of radiation with matter; (5) engineering science research applicable to advanced nuclear reactor concepts, industry safety and reliability concerns; (6) neutronics that address improvements in reactor computational methodologies and knowledge of the basic fission processes; and (7) nuclear thermal hydraulics that address improvements of models and analysis of thermal hydraulic behavior in an advanced nuclear reactor system.

(f) Used Energy-Related Laboratory Equipment (ERIE) Program

In accordance with DOE's responsibility to encourage research and development in the energy area, grants of used energy-related laboratory equipment for use in energy-oriented educational programs in the life, physical and environmental sciences, and engineering are available to universities, colleges and other non-profit educational institutions of higher learning in the United States. An institution is not required to have a current DOE grant or contract in order to participate in this program. The program office should be contacted for specific information on how to access the list of eligible equipment under this program. The cost of care and handling incident to the grant must be borne by the institution.

9. Program Analysis

The Office of Program Analysis conducts assessments to identify research opportunities in specific areas of interest to DOE programs.

[57 FR 40583, Sept. 3, 1992, as amended at 79 FR 76047, Dec. 19, 2014]

PART 609 LOAN GUARANTEES FOR CLEAN ENERGY PROJECTS

Authority: 42 U.S.C. 7254, 16511-16517.

Source: 88 FR 34428, May 30, 2023, unless otherwise noted.

§ 609.1 Purpose and scope.

(a) This part sets forth the policies and procedures that DOE uses for receiving, evaluating, and approving applications for loan guarantees to support Eligible Projects under Title XVII, including sections 1703 and 1706, of the Energy Policy Act of 2005.

(b) This part applies to all Applications, Conditional Commitments, and Loan Guarantee Agreements.

(c) Section 600.22 of title 10 of the Code of Federal Regulations shall not apply to actions taken under this part.

§ 609.2 Definitions.

When used in this part the following words have the following meanings.

Administrative Cost of a Loan Guarantee means

(1) The total of all administrative expenses that DOE incurs during:

(i) The evaluation of an Application for a Guarantee;

(ii) The negotiation and offer of a Term Sheet;

(iii) The negotiation of a Loan Guarantee Agreement and related documents, including the issuance of a Guarantee; and

(iv) The servicing and monitoring of a Loan Guarantee Agreement, including during the construction, startup, commissioning, shakedown, and operational phases of an Eligible Project.

(2) The Administrative Cost of a Loan Guarantee does not include Transaction Costs.

Applicant means a prospective Borrower, Project Sponsor, or Eligible Lender that submits an Application to DOE.

Application means a submission of written materials to DOE completed in accordance with the applicable requirements published by DOE in guidance on the Title XVII website.

Attorney General means the Attorney General of the United States.

Borrower means any Person that enters into a Loan Guarantee Agreement with DOE and issues or otherwise becomes obligated for the Guaranteed Obligations.

Cargo Preference Act means the Cargo Preference Act of 1954, 46 U.S.C. 55305, as amended.

Commercial Technology means a technology in general use in the commercial marketplace in the United States at the time the Term Sheet is offered by DOE. A technology is in general use if it is being used in three or more facilities that are in commercial operation in the United States for the same general purpose as the proposed project, and has been used in each such facility for a period of at least five years. The five-year period for each facility shall start on the in-service date of the facility employing that particular technology or, in the case of a retrofit of a facility to employ a particular technology, the date the facility resumes commercial operation following completion and testing of the retrofit. For purposes of this section, facilities considered to be in commercial operation for five years include projects that have been the recipients of a loan guarantee from DOE under this part whether or not commercial operations have commenced.

Conditional Commitment means a Term Sheet offered by DOE and accepted by the offeree of the Term Sheet, all in accordance with § 609.6.

Contracting Officer means the Secretary of Energy or a DOE official authorized by the Secretary to enter into, administer or terminate DOE Loan Guarantee Agreements and related contracts on behalf of DOE.

Credit Subsidy Cost has the same meaning as “cost of a loan guarantee” in section 502(5)(C) of the Federal Credit Reform Act of 1990.

Davis-Bacon Act means the statute referenced in section 1702(k) of Title XVII.

DOE means the United States Department of Energy.

Eligible Lender means:

(1) Any Person formed for the purpose of, or engaged in the business of, lending money, including State Energy Financing Institutions, financial institutions, and trusts or other entities designated as trustees or agents acting on behalf of institutional investors, bondholders, or other lenders that, as determined by DOE in each case, is:

(i) Not debarred or suspended from participation in a Federal Government contract or participation in a non-procurement activity (under a set of uniform regulations implemented for numerous agencies, such as DOE, at 2 CFR part 180);

(ii) Not delinquent on any Federal debt or loan;

(iii) Legally authorized and empowered to enter into loan guarantee transactions authorized by Title XVII and this part;

(iv) Able to demonstrate experience in originating and servicing loans for commercial projects similar in size and scope to the Eligible Project, or able to procure such experience through contracts acceptable to DOE; and

(v) Able to demonstrate experience as the lead lender or underwriter by presenting evidence of its participation in large commercial projects or energy-related projects or other relevant experience, or able to procure such experience through contracts acceptable to DOE; or

(2) The Federal Financing Bank.

Eligible Project has the meaning set forth in § 609.3.

Energy Dominance Financing Project has the meaning set forth in § 609.3.

Energy Infrastructure means a facility, and associated equipment, used for enabling the identification, leasing, development, production, processing, transportation, transmission, refining, and generation needed for energy and critical minerals.

Equity means cash, and at DOE's sole discretion and subject to DOE's sole determination of value, in-kind contributions and property, in each case contributed to the permanent capital stock (or equivalent) of the Borrower or the Eligible Project by the shareholders or other owners of the Borrower or the Eligible Project. In-kind contributions may not include services, but may include physical and/or intellectual property. Equity does not include proceeds from the non-guaranteed portion of a Guaranteed Obligation, proceeds from any other non-guaranteed loan or obligation of the Borrower, or the value of any Federal, State, or local government assistance or support or any cost-share requirements under a Federal award.

Facility Fee means the fee, to be paid in the amount and in the manner provided in the Term Sheet, to cover the Administrative Cost of a Loan Guarantee for the period from the Application through issuance of the Guarantee.

Federal Financing Bank means an instrumentality of the United States Government created by the Federal Financing Bank Act of 1973, under the general supervision of the Secretary of the Treasury.

Guarantee means the undertaking of the United States of America, acting through the Secretary pursuant to Title XVII, to pay in accordance with the terms thereof, principal and interest of a Guaranteed Obligation.

Guaranteed Obligation means any loan or other debt obligation of the Borrower for an Eligible Project for which DOE guarantees all or any part of the payment of principal and interest under a Loan Guarantee Agreement entered into pursuant to Title XVII.

Holder means any Person that holds a promissory note made by the Borrower evidencing the Guaranteed Obligation (or his or her designee or agent).

Innovative Energy Project has the meaning set forth in § 609.3.

Innovative Supply Chain Project has the meaning set forth in § 609.3.

Intercreditor Agreement means any agreement or instrument (or amendment or modification thereof) among DOE and one or more other Persons providing financing or other credit arrangements to the Borrower (or an Eligible Project) or that otherwise provides for rights of DOE in respect of a Borrower or in respect of an Eligible Project, in each case in form and substance satisfactory to DOE.

Loan Agreement means a written agreement between a Borrower and an Eligible Lender containing the terms and conditions under which the Eligible Lender will make a loan or loans to the Borrower for an Eligible Project.

Loan Guarantee Agreement means a written agreement that, when entered into by DOE and a Borrower, and, if applicable, an Eligible Lender, establishes the obligation of DOE to guarantee the payment of all or a portion of the principal of, and interest on, specified Guaranteed Obligations, subject to the terms and conditions specified in the Loan Guarantee Agreement.

Maintenance Fee means the fee, to be paid in the amount and manner provided in the Term Sheet, to cover the Administrative Cost of a Loan Guarantee, other than extraordinary expenses, incurred in servicing and monitoring a Loan Guarantee Agreement after the issuance of the Guarantee.

New or Significantly Improved Technology means

(1) A technology, or a defined suite of technologies, concerned with the production, storage, consumption, or transportation of energy, including of associated critical minerals and other components or other eligible energy-related project categories under section 1703(b) of Title XVII, and that is not a Commercial Technology, and that either:

(i) Has only recently been developed, discovered, or learned; or

(ii) Involves or constitutes one or more meaningful and important improvements in productivity or value, in comparison to Commercial Technologies in use in the United States at the time the Term Sheet is issued.

(2) If regional variation significantly affects the deployment of a technology, such technology may still be considered “New or Significantly Improved Technology” if no more than 6 projects employ the same or similar technology as another project, provided no more than 2 projects that use the same or a similar technology are located in the same region of the United States.

OMB means the Office of Management and Budget in the Executive Office of the President.

Person means any natural person or any legally constituted entity, including a state or local government, tribe, corporation, company, voluntary association, partnership, limited liability company, joint venture, and trust.

Project Costs mean those costs, including escalation and contingencies, that are expended or accrued by a Borrower and are necessary, reasonable, customary, and directly related to the design, engineering, financing, construction, startup, commissioning, and shakedown of an Eligible Project, as specified in § 609.10. Project Costs do not include costs for the items set forth in § 609.10(d).

Project Sponsor means any Person that assumes substantial responsibility for the development, financing, and structuring of an Eligible Project and owns or controls, by itself and/or through individuals in common or affiliated business entities, a five percent or greater interest in the proposed Eligible Project or the Borrower.

Reasonable Prospect of Repayment has the meaning set forth in 42 U.S.C. 16512(d)(1)(B).

Risk-Based Charge means a charge that, together with the principal and interest on the Guaranteed Obligation, or at such other times as DOE may determine, is payable on specified dates during the term of a Guaranteed Obligation.

Secretary means the Secretary of Energy or a duly authorized designee or successor in interest.

State means any State, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, and any territory or possession of the United States.

State Energy Financing Institution means

(1) A quasi-independent entity or an entity within a State agency or financing authority established by a State:

(i) To provide financing support or credit enhancements, including loan guarantees and loan loss reserves, for Eligible Projects; and

(ii) To create liquid markets for eligible projects, including warehousing and securitization, or take other steps to reduce financial barriers to the deployment of existing and new Eligible Projects.

(2) The term “State Energy Financing Institution” includes an entity or organization established by an Indian Tribal entity or an Alaska Native Corporation to achieve the purposes described in paragraphs (1)(i) and (ii) of this definition.

State Energy Financing Institution Project has the meaning set forth in § 609.3.

Term Sheet means a written offer for the issuance of a loan guarantee, executed by the Secretary (or a DOE official authorized by the Secretary to execute such offer), delivered to the Applicant, that sets forth the detailed terms and conditions under which DOE and the Applicant will execute a Loan Guarantee Agreement.

Title XVII means Title XVII of the Energy Policy Act of 2005 (42 U.S.C. 16511-16517), as amended.

Title XVII Loan Guarantee Program means the program administered by DOE pursuant to Title XVII, regulations under this part, DOE guidance and policy documents, and other applicable laws and requirements.

Transaction Costs mean:

(1)(i) Out-of-pocket costs of financial, legal, and other professional services associated with the financing of an Eligible Project, including services necessary to obtain required licenses and permits, prepare environmental reports and data, conduct legal and technical due diligence, develop and audit a financial model, negotiate the terms and provisions of project contracts and financing documents, including those costs associated with the advisors to DOE and any other Eligible Lender; and

(ii) Costs of issuing Eligible Project debt, such as commitment fees, upfront fees, and other applicable financing fees, costs and expenses imposed by Eligible Lenders.

(2) Transaction Costs do not include the Administrative Cost of a Loan Guarantee or Credit Subsidy Costs.

United States means the several States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, and any territory or possession of the United States of America.

[88 FR 34428, May 30, 2023, as amended at 90 FR 48710, Oct. 28, 2025]

§ 609.3 Title XVII eligible projects.

(a)(1) DOE is authorized to provide loan Guarantees for certain categories of projects under Title XVII including:

(i) Innovative Energy Projects under section 1703 of Title XVII;

(ii) Innovative Supply Chain Projects under section 1703 of Title XVII;

(iii) State Energy Financing Institution Projects under section 1703 of Title XVII; and

(iv) Energy Dominance Financing Projects under section 1706 of Title XVII.

(2) A Project meeting the applicable eligibility requirements set forth herein constitutes an “Eligible Project” under Title XVII.

(b) An eligible Innovative Energy Project is a project that:

(1) Falls within a category set forth in section 1703(b) of Title XVII;

(2) Is located in the United States;

(3) Is at one location, except that the project may be located at two or more locations if the project is comprised of installations or facilities employing a single New or Significantly Improved Technology that is deployed pursuant to an integrated and comprehensive business plan. An Innovative Energy Project located in more than one location is a single Eligible Project;

(4) Deploys a New or Significantly Improved Technology; and

(5) Avoids, reduces, utilizes, or sequesters air pollutants or anthropogenic emissions of greenhouse gases.

(c) An eligible Innovative Supply Chain Project is a project that:

(1) Manufactures a product with an end-use set forth in section 1703(b) of Title XVII;

(2) Is located in the United States;

(3) Is at one location, except that the project may be located at two or more locations if the project is comprised of installations or facilities employing a single New or Significantly Improved Technology that is deployed pursuant to an integrated and comprehensive business plan. An Innovative Supply Chain Project located in more than one location is a single Eligible Project;

(4) Either:

(i) Deploys a New or Significantly Improved Technology in the manufacturing process; or

(ii) Manufactures a product that represents a New or Significantly Improved Technology; and

(5) Avoids, reduces, utilizes, or sequesters air pollutants or anthropogenic emissions of greenhouse gases through:

(i) The relevant manufacturing process of the relevant product; or

(ii) The end-use of the component on a full life-cycle basis.

(d) An eligible State Energy Financing Institution Project is a project that:

(1) Falls within a category set forth in section 1703(b) of Title XVII;

(2) Is located at one or more locations in the United States;

(3) Avoids, reduces, utilizes, or sequesters air pollutants or anthropogenic emissions of greenhouse gases;

(4) Receives financial support or credit enhancements from a State Energy Financing Institution; and

(5) May include a partnership between one or more State Energy Financing Institutions and private entities, Tribal entities, or Alaska Native corporations in carrying out the project.

(e) An eligible Energy Dominance Financing Project is a project that:

(1) Is located in the United States;

(2) Either:

(i) Retools, repowers, repurposes, or replaces Energy Infrastructure that has ceased operations;

(ii) Enables operating Energy Infrastructure to increase capacity or output; or

(iii) Supports or enables the provision of known or forecastable electric supply at time intervals necessary to maintain or enhance grid reliability or other system adequacy needs; and

(3) May include the remediation of environmental damage associated with Energy Infrastructure.

[88 FR 34428, May 30, 2023, as amended at 90 FR 48710, Oct. 28, 2025]

§ 609.4 Submission of applications.

(a) DOE may direct that Applications be submitted in more than one part; provided, that the parts of such Application, taken as a whole, contain such information published by DOE in guidance on the Title XVII Loan Guarantee Program website pursuant to § 609.19. In such event, subsequent parts of an Application may be filed only after DOE invites an Applicant to make an additional submission. If DOE directs that Applications be submitted in more than one part, the initial part of an Application shall contain information sufficient for DOE to determine that the project proposed by an Applicant will be, or may reasonably become, an Eligible Project, and to evaluate such project's readiness to proceed. If there have been any material amendments, modifications, or additions made to the information previously submitted by an Applicant, the Applicant shall provide a detailed description thereof, including any changes in the proposed project's financing structure or other terms, promptly upon request by DOE.

(b) An Applicant may submit Applications for multiple proposed projects and for projects using different technologies; provided that an Applicant for an Innovative Energy Project or Innovative Supply Chain Project may not submit an Application or Applications for multiple Innovative Energy Projects or multiple Innovative Supply Chain Projects using the same technology. For purposes of this paragraph (b), the term “Applicant” shall include the Project Sponsor and any subsidiaries or affiliates of the Project Sponsor.

(c) DOE has no obligation to evaluate an Application that is not complete, and may proceed with such evaluation, or a partial evaluation, only in its discretion. DOE will not design an Eligible Project for Applicants, but may respond, in its discretion, in general terms to specific proposals. DOE's response to questions from potential Applicants are pre-decisional and preliminary in nature.

(d) Unless an Applicant requests an extension and such an extension is granted by DOE in its discretion, an Application may be rejected if it is not complete within two years from the date of submission (or date of submission of the first part thereof, in the case of Applications made in more than one part).

(e) DOE shall respond, in writing, to any inquiry by an Applicant about the status of its Application within ten (10) days of receipt of such request. If an Application has been pending before DOE for 180 days or more, such response shall include:

(1) A description of the current status of review of the Application;

(2) A summary of any factors that are delaying a final decision on the Application, a list of what items are required in order to reach a final decision, citations to authorities stating the reasons why such items are required, and a list of actions the Applicant can take to expedite the process; and

(3) An estimate of when a final decision on the Application will be made.

§ 609.5 Evaluation of applications.

(a) Applications will be considered in a merit-based review process, considering such factors determined and published by DOE in guidance on its Title XVII Loan Guarantee Program website pursuant to § 609.19. At any time, DOE may request additional information or supporting documentation from an Applicant.

(b) Applications will be denied if:

(1) The proposed project is not an Eligible Project;

(2) With respect to applications for Innovative Energy Projects and Innovative Supply Chain Projects, the applicable technology is not ready to be deployed commercially in the United States, cannot yield a commercially viable product or service in the use proposed in the Application, does not have the potential to be deployed in other commercial projects in the United States, or is not or will not be available for further commercial use in the United States;

(3) The Person proposed to issue the loan or purchase other debt obligations constituting the Guaranteed Obligations is not an Eligible Lender;

(4) The proposed project is for demonstration, research, or development;

(5) Significant Equity for the proposed project will not be provided by the date of issuance of the Guaranteed Obligations, or such later time as DOE in its discretion may determine;

(6) The proposed project does not present a Reasonable Prospect of Repayment of the Guaranteed Obligations;

(7) With respect to applications for Energy Dominance Financing Projects, where the Applicant is an electric utility, such application fails to include an assurance that Applicant will pass on the financial benefit from the Guarantee to the customers of, or associated communities served by, the electric utility; or

(8) The Applicant or Project Sponsor does not satisfy DOE's “know your customer” requirements.

(c) If an Application has not been denied pursuant to paragraph (b) of this section, DOE will evaluate the proposed project based on the criteria published by DOE in guidance on its Title XVII Loan Guarantee Program website pursuant to § 609.19.

(d) After DOE completes its review and evaluation of a proposed project, DOE will notify the Applicant in writing of its determination whether to proceed with due diligence and negotiation of a Term Sheet. DOE will proceed only if it determines that the proposed project is highly qualified and suitable for a Guarantee. Upon written confirmation from the Applicant that it desires to proceed, DOE and the Applicant will commence negotiations.

(e) DOE shall provide all Applicants with a reasonable opportunity to correct or amend any Application in order to meet the criteria set forth in this part or any other conditions required by DOE, prior to any denial of such Application. A determination by DOE not to proceed with a proposed project shall be final and non-appealable, but shall not prejudice the Applicant or other affected Persons from applying for a Guarantee in respect of a different proposed project pursuant to another, separate Application. Prior to DOE's denial of any Application, DOE shall advise the Applicant in writing, not less than ten (10) business days prior to the effective date of such denial. If an Application could be amended or corrected such that DOE would determine that the project is highly qualified and suitable for a Guarantee, DOE may set forth the reasons for such proposed denial along with a list of items that may be corrected or amended by the Applicant. If requested by any Applicant, DOE shall meet with such Applicant in order to address questions or concerns raised by the Applicant.

[88 FR 34428, May 30, 2023, as amended at 90 FR 48710, Oct. 28, 2025]

§ 609.6 Term sheets and conditional commitments.

(a) DOE, after negotiation of a Term Sheet with an Applicant, may offer such Term Sheet to an Applicant or such other Person that is an affiliate of the Applicant and that is acceptable to DOE. DOE's offer of a Term Sheet shall be in writing and signed by the Contracting Officer. DOE's negotiation of a Term Sheet imposes no obligation on the Secretary to offer a Term Sheet to the Applicant.

(b) DOE shall terminate its negotiations of a Term Sheet if it has not offered a Term Sheet in respect of an Eligible Project within two years after the date of the written notification set forth in § 609.5(d), unless extended in writing by DOE.

(c) If and when the offeree specified in a Term Sheet satisfies all terms and conditions for acceptance of the Term Sheet, including written acceptance thereof, the Term Sheet shall become a Conditional Commitment. Each Conditional Commitment shall include an expiration date no more than two years from the date it is issued, unless extended in writing in the discretion of the Contracting Officer. When and if all of the terms and conditions specified in the Conditional Commitment have been met, DOE and the Applicant may enter into a Loan Guarantee Agreement. If applicable, the Conditional Commitment shall include the terms and conditions pursuant to which any Credit Subsidy Cost payment made by the Borrower to the Secretary is subject to refund to the Borrower in the event that the closing date of the Loan Guarantee Agreement does not occur.

(d) Prior to or on the date of the Conditional Commitment, DOE will ensure that:

(1) OMB has reviewed and approved DOE's calculation of the Credit Subsidy Cost of the Guarantee;

(2) One of the following has occurred:

(i) Appropriated funds for the Credit Subsidy Cost are available;

(ii) The Secretary has received from the Borrower payment in full for the Credit Subsidy Cost and deposited the payment into the Treasury; or

(iii) A combination of one or more appropriations under paragraph (d)(2)(i) of this section and one or more payments from the Borrower under paragraph (d)(2)(ii) of this section has been made that is equal to the Credit Subsidy Cost; and

(3) The Department of the Treasury has been consulted as to the proposed terms and conditions of the Loan Guarantee Agreement.

(e) If, subsequent to execution of a Conditional Commitment, the financing arrangements of the Borrower, or in respect of an Eligible Project, change from those described in the Conditional Commitment, the Applicant shall promptly provide updated financing information in writing to DOE. All such updated information shall be deemed to be information submitted in connection with an Application. Based on such updated information, DOE may take one or more of the following actions:

(1) Determine that such changes are not material to the Borrower, the Eligible Project or DOE;

(2) Amend the Conditional Commitment accordingly, including by re-calculating the Credit Subsidy Cost in accordance with § 609.6(d);

(3) Postpone the expected closing date of the associated Loan Guarantee Agreement; or

(4) Terminate the Conditional Commitment.

§ 609.7 Closing on the loan guarantee agreement.

(a) Subsequent to entering into a Conditional Commitment with an Applicant, DOE, after consultation with the Applicant, will set a closing date for execution of a Loan Guarantee Agreement.

(b) Prior to or on the closing date of a Loan Guarantee Agreement DOE will ensure that:

(1) Pursuant to section 1702(h) of Title XVII, DOE will receive from the Applicant the Facility Fee referred to in § 609.13(b) on the closing date;

(2) The Department of the Treasury has been consulted as to the terms and conditions of the Loan Guarantee Agreement.

(2) The Loan Guarantee Agreement and related documents contain all terms and conditions DOE deems reasonable and necessary to protect the interest of the United States;

(3) Each holder of the Guaranteed Obligations is an Eligible Lender, and the servicer of the Guaranteed Obligations meets the servicing performance requirements of § 609.9(b);

(4) DOE has determined the principal amount of the Guaranteed Obligations expected to be issued in respect of the Eligible Project, as estimated at the time of issuance, will not exceed 80 percent of the Project Costs of the Eligible Project;

(5) DOE has completed all necessary reviews under the National Environmental Policy Act of 1969; and

(6) All conditions precedent specified in the Conditional Commitment are either satisfied or waived in writing by the Contracting Officer. If the counterparty to the Conditional Commitment has not satisfied all such terms and conditions on or prior to the closing date of the Loan Guarantee Agreement, DOE may, in its discretion, set a new closing date, or terminate the Conditional Commitment.

§ 609.8 Loan guarantee agreement.

(a) Only a Loan Guarantee Agreement executed by the Contracting Officer can obligate DOE to issue a Guarantee in respect of Guaranteed Obligations. DOE is not bound by oral representations.

(b) Each Loan Guarantee Agreement shall contain the following requirements and conditions, and shall not be executed until the Contracting Officer determines that the following requirements and conditions are satisfied:

(1) The Federal Financing Bank shall be the only Eligible Lender in transactions where DOE guarantees 100 percent (but not less than 100 percent) of the principal and interest of the Guaranteed Obligations issued under a Loan Guarantee Agreement. Where DOE guarantees 90 percent or less of the Guaranteed Obligation, the guaranteed portion may be separated from or “stripped” from the non-guaranteed portion of the Guaranteed Obligation, if the loan is participated, syndicated or otherwise resold in the secondary debt market.

(2) The Borrower shall be obligated to make full repayment of the principal and interest on the Guaranteed Obligations and other debt of a Borrower over a period not to exceed:

(i) In the case of an Innovative Energy Project, an Innovative Supply Chain Project, or a State Energy Financing Institution Project, the lesser of 30 years or 90 percent of the projected useful life of the Eligible Project's major physical assets, as calculated in accordance with U.S. generally accepted accounting principles and practices; and

(ii) In the case of an Energy Dominance Financing Project, 30 years.

(3) If any financing or credit arrangement of the Borrower or relating to the Eligible Project, other than the Guaranteed Obligations, has an amortization period shorter than that of the Guaranteed Obligations, DOE shall have determined that the resulting financing structure allocates to DOE a reasonably proportionate share of the default risk, in light of:

(i) DOE's share of the total debt financing of the Borrower;

(ii) Risk allocation among the credit providers to the Borrower; and

(iii) Internal and external credit enhancements.

(4) The Guarantee does not finance, either directly or indirectly tax-exempt debt obligations, consistent with the requirements of section 149(b) of the Internal Revenue Code.

(5) The principal amount of the Guaranteed Obligations, when combined with funds from other sources committed and available to the Borrower, shall be sufficient to pay for expected Project Costs (including adequate contingency amounts) and otherwise to carry out the Eligible Project.

(6) There shall be a Reasonable Prospect of Repayment by the Borrower of the principal of and interest on the Guaranteed Obligations and all of its other debt obligations.

(7) The Borrower shall pledge collateral or surety determined by DOE to be necessary to secure the repayment of the Guaranteed Obligations. Such collateral or security may include Eligible Project assets and assets not related to the Eligible Project.

(8) The Loan Guarantee Agreement and related documents shall include detailed terms and conditions that DOE deems necessary and appropriate to protect the interests of the United States in the case of default, including ensuring availability of all relevant intellectual property rights, technical data including software, and technology necessary for DOE or any Person selected by DOE, to complete, operate, convey, and dispose of the defaulted Borrower or the Eligible Project.

(9) The Guaranteed Obligations shall not be subordinate in payment or lien priority to other financing. In DOE's discretion, Guaranteed Obligations may share a lien position with other financing on a pari passu basis.

(10) There is satisfactory evidence that the Borrower will diligently pursue the Eligible Project and is willing, competent, and capable of performing its obligations under the Loan Guarantee Agreement and the loan documentation relating to its other debt obligations.

(11) The Borrower shall have paid all fees and expenses due to DOE or the U.S. Government, including such amount of the Credit Subsidy Cost as may be due and payable from the Borrower at the time of the Conditional Commitment.

(12) The Borrower, any Eligible Lender, and each other relevant party shall take, and be obligated to continue to take, those actions necessary to perfect and maintain liens on collateral in respect of the Guaranteed Obligations.

(13) DOE or its representatives shall have access to the offices of the Borrower and the Eligible Project site at all reasonable times in order to monitor the—

(i) Performance by the Borrower of its obligations under the Loan Guarantee Agreement; and

(ii) Performance of the Eligible Project.

(14) DOE and Borrower have reached an agreement regarding the information that will be made available to DOE and the information that will be made publicly available.

(15) The Borrower shall have filed applications for or obtained any required regulatory approvals for the Eligible Project and is in compliance, or promptly will be in compliance, where appropriate, with all Federal, State, and local regulatory requirements.

(16) The Borrower shall have no delinquent Federal debt.

(17) The Project Sponsors have made or will make a significant Equity investment in the Borrower or the Eligible Project, and will maintain control of the Borrower or the Eligible Project as agreed in the Loan Guarantee Agreement.

(18) The Loan Guarantee Agreement and related agreements shall include such other terms and conditions as DOE deems necessary or appropriate to protect the interests of the United States.

(c) The Loan Guarantee Agreement shall provide that, in the event of a default by the Borrower:

(1) Interest on the Guaranteed Obligations shall accrue at the rate or penalty rate, as applicable, stated in the Loan Guarantee Agreement or the Loan Agreement until DOE makes full payment of the defaulted Guaranteed Obligations and, except when such Guaranteed Obligations are funded through the Federal Financing Bank, DOE shall not be required to pay any premiums, defaults, or prepayment penalties; and

(2) The holder of collateral pledged in respect of the Guaranteed Obligations shall be obligated to take such actions as DOE may reasonably require to provide for the care, preservation, protection, and maintenance of such collateral so as to enable the United States to achieve maximum recovery.

(d)(1) An Eligible Lender or other Holder may sell, assign or transfer a Guaranteed Obligation to another Eligible Lender that meets the requirements of § 609.9. Such latter Eligible Lender shall be required to assume all servicing, monitoring, and reporting requirements as provided in the Loan Guarantee Agreement. Any transfer of the servicing, monitoring, and reporting functions shall be subject to the prior written approval of DOE.

(2) The Secretary, or the Secretary's designee or contractual agent, for the purpose of identifying Holders with the right to receive payment under the Guaranteed Obligations, shall include in the Loan Guarantee Agreement or related documents a procedure for tracking and identifying Holders of Guaranteed Obligations. Any contractual agent approved by the Secretary to perform this function may transfer or assign this responsibility only with the Secretary's prior written approval.

(e) Each Loan Guarantee Agreement shall require the Borrower to make representations and warranties, agree to covenants, and satisfy conditions precedent to closing and to each disbursement that, in each case, relate to its compliance with the Davis-Bacon Act and the Cargo Preference Act.

(f) The Applicant, the Borrower, or the Project Sponsor must estimate, calculate, record, and provide to DOE any time DOE requests such information and at the times provided in the Loan Guarantee Agreement all costs incurred in the design, engineering, financing, construction, startup, commissioning, and shakedown of the Eligible Project in accordance with generally accepted accounting principles and practices.

[88 FR 34428, May 30, 2023, as amended at 90 FR 48710, Oct. 28, 2025]

§ 609.9 Lender servicing requirements.

(a) When reviewing and evaluating a proposed Eligible Project, all Eligible Lenders (other than the Federal Financing Bank) shall at all times exercise the level of care and diligence that a reasonable and prudent lender would exercise when reviewing, evaluating, and disbursing a loan made by it without a Federal guarantee.

(b) Loan servicing duties shall be performed by an Eligible Lender, DOE, or another qualified loan servicer approved by DOE. When performing its servicing duties, the loan servicer shall at all times exercise the level of care and diligence that a reasonable and prudent lender would exercise when servicing a loan made without a Federal guarantee, including:

(1) During the construction period, monitoring the satisfaction of all of the conditions precedent to all loan disbursements, as provided in the Loan Guarantee Agreement, Loan Agreement, or related documents;

(2) During the operational phase, monitoring and servicing the Guaranteed Obligations and collection of the outstanding principal and accrued interest as well as undertaking to ensure that the collateral package securing the Guaranteed Obligations remains uncompromised; and

(3) Until the Guaranteed Obligations have been repaid, providing annual or more frequent financial and other reports on the status and condition of the Guaranteed Obligations and the Eligible Project, and promptly notifying DOE if it becomes aware of any problems or irregularities concerning the Eligible Project or the ability of the Borrower to make payment on the Guaranteed Obligations or its other debt obligations.

§ 609.10 Project costs.

(a) The Project Costs of an Eligible Project are those costs, including escalation and contingencies, that are expended or accrued by a Borrower and are necessary, reasonable, customary, and directly related to the design, engineering, financing, construction, startup, commissioning, and shakedown of an Eligible Project.

(b) Project Costs include:

(1) Costs of acquisition, lease, or rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal fees incurred in connection with land acquisition, lease or rental, site improvements, site restoration, access roads, and fencing;

(2) Costs of engineering, architectural, legal and bond fees, and insurance paid in connection with construction of the facility;

(3) Costs of equipment purchases, including a reasonable reserve of spare parts to the extent required;

(4) Costs to provide facilities and services related to safety and environmental protection;

(5) Transaction Costs;

(6) Costs of necessary and appropriate insurance and bonds of all types including letters of credit and any collateral required therefor;

(7) Costs of design, engineering, startup, commissioning, and shakedown;

(8) Costs of obtaining licenses to intellectual property necessary to design, construct, and operate the Eligible Project;

(9) To the extent required by the Loan Guarantee Agreement and not intended or available for any cost referred to in paragraph (d) of this section, costs of funding any reserve fund, including without limitation, a debt service reserve, a maintenance reserve, and a contingency reserve for cost overruns during construction; provided that proceeds of a Guaranteed Obligation deposited to any reserve fund shall not be removed from such fund except to pay Project Costs, to pay principal of the Guaranteed Obligation, or otherwise to be used as provided in the Loan Guarantee Agreement;

(10) Capitalized interest necessary to meet market requirements and other carrying costs during construction;

(11) In DOE's sole discretion, the cost of refinancing outstanding indebtedness that is directly associated with the Eligible Project, including the principal amount of such indebtedness, accrued interest thereon, and any reasonable and customary prepayment premium or breakage costs; provided that DOE determines that the refinancing furthers the purpose of the Eligible Project.

(12) With respect to Energy Dominance Financing Projects, the cost of remediation of environmental damage associated with the Energy Infrastructure; and

(13) Other necessary and reasonable costs, including, without limitation, previously acquired real estate, equipment, or other materials, costs of interconnection, and any engineering, construction, make-ready, design, permitting, or other work completed on an existing facility or project;

(c) Where a Project consists of the financing and installation of a series of distributed energy resources, DOE may deem the eligible Project Costs to consist of the reasonable and documented costs incurred by the end-user of each distributed energy resource in connection with the contractual agreement between the end-user and the Project Sponsor or its agent, provided that:

(1) DOE is able to validate such reasonable and documented costs through standard customer contracts and standard distributed energy resource system attributes; and

(2) The Borrower institutes a compliance system satisfactory to DOE to ensure that each distributed energy resource supported by a Guarantee complies with any eligibility criteria required by DOE, including with respect to approved customer contracts and approved distributed energy resource systems.

(d) Project Costs do not include:

(1) Fees and commissions charged to Borrower, including finder's fees, for obtaining Federal or other funds;

(2) Parent corporation or other affiliated entity's general and administrative expenses, and non-Eligible Project related parent corporation or affiliated entity assessments, including organizational expenses;

(3) Goodwill, franchise, trade, or brand name costs;

(4) Dividends and profit sharing to stockholders, employees, and officers;

(5) Research, development, and demonstration costs of readying an innovative technology for employment in a commercial project;

(6) Costs that are excessive or are not directly required to carry out the Eligible Project, as determined by DOE;

(7) Expenses incurred after startup, commissioning, and shakedown of the facility, or, in DOE's discretion, any portion of the facility that has completed startup, commissioning, and shakedown;

(8) Borrower-paid Credit Subsidy Costs, the Administrative Cost of a Loan Guarantee, and any other fee collected by DOE; and

(9) Operating costs.

(e) Costs incurred in connection with an Eligible Project may be subject to such other criteria for inclusion as Project Costs as published by DOE from time to time in guidance on the Title XVII Loan Guarantee Program website pursuant to § 609.19.

[88 FR 34428, May 30, 2023, as amended at 90 FR 48710, Oct. 28, 2025]

§ 609.11 Transaction costs.

(a) Upon making a determination to engage independent consultants or outside counsel with respect to an Application, DOE will proceed to evaluate and process such Application only following execution by an Applicant or Project Sponsor, as appropriate, of an agreement satisfactory to DOE to pay the Transaction Costs charged by the independent consultants and outside legal counsel. Each Applicant, Borrower, or Project Sponsor, as applicable, shall be responsible for the payment of Transaction Costs associated with DOE's independent consultants and outside legal counsel in connection with an Application, Conditional Commitment, or Loan Guarantee Agreement, as applicable. Appropriate provisions regarding payment of such Transaction Costs shall also be included in each Term Sheet and Loan Guarantee Agreement or, upon a determination by DOE, in other appropriate agreements.

(b) Notwithstanding payment by Applicant, Borrower, or Project Sponsor, all services rendered by an independent consultant or outside legal counsel to DOE in connection with an Application, Conditional Commitment, or Loan Guarantee Agreement shall be solely for the benefit of DOE (and such other creditors as DOE may agree in writing). DOE may require, in its discretion, the payment of an advance retainer to such independent consultants or outside legal counsel as security for the collection of the fees and expenses charged by the independent consultants and outside legal counsel. In the event an Applicant, Borrower, or Project Sponsor fails to comply with the provisions of such payment agreement, DOE in its discretion, may stop work on or terminate an Application, a Conditional Commitment, or a Loan Guarantee Agreement, or may take such other remedial measures in its discretion as it deems appropriate.

(c) DOE shall not be financially liable under any circumstances to any independent consultant or outside counsel for services rendered in connection with an Application, Conditional Commitment, or Loan Guarantee Agreement except to the extent DOE has previously entered into an express written agreement to pay for such services.

§ 609.12 Credit ratings.

(a) Where conditions justify, in the sole discretion of the Secretary, DOE may require that an Applicant submit a preliminary credit assessment for the proposed project, reflecting the project without a Guarantee, from a nationally recognized statistical ratings organization.

(b) Where conditions justify, in the sole discretion of the Secretary, DOE may require that an Applicant provide a credit rating for the proposed project, and subsequently provide updated ratings, from a nationally recognized statistical ratings organization.

§ 609.13 Fees and charges.

(a) Unless explicitly authorized by statute, no funds obtained from the Federal Government, or from a loan or other instrument guaranteed by the Federal Government, may be used to pay for the Credit Subsidy Cost, the Facility Fee, the Maintenance Fee, and any other fees charged by or paid to DOE relating to Title XVII or any Guarantee thereunder. An Applicant may, at any time, use non-Federal monies to pay the Credit Subsidy Cost or DOE fees.

(b) DOE may charge Applicants a non-refundable Facility Fee, payable on the closing date for the Loan Guarantee Agreement.

(c) In order to encourage and supplement private lending activity DOE may collect from Borrowers for deposit in the United States Treasury a non-refundable Risk-Based Charge which, together with the interest rate on the Guaranteed Obligation that LPO determines to be appropriate, will take into account the prevailing rate of interest in the private sector for similar loans and risks. The Risk-Based Charge shall be paid at such times and in such manner as may be determined by DOE, but no less frequently than once each year, commencing with payment of a pro-rated payment on the date the Guarantee is issued. The amount of the Risk-Based Charge will be specified in the Loan Guarantee Agreement.

(d) DOE may collect a Maintenance Fee as set forth in the Loan Guarantee Agreement. The Maintenance Fee shall accrue from the date of execution of the Loan Guarantee Agreement through the date of payment in full of the related Guaranteed Obligations. If DOE determines to collect a Maintenance Fee, it shall be paid by the Borrower each year (or portion thereof) in advance in the amount specified in the applicable Loan Guarantee Agreement.

(e) In the event a Borrower or an Eligible Project experiences difficulty relating to technical, financial, or legal matters or other events (e.g., engineering failure or financial workouts), the Borrower shall be liable as follows:

(1) If such difficulty requires DOE to incur time or expenses beyond those customarily expended to monitor and administer performing loans, DOE may collect an extraordinary expenses fee from the Borrower that will reimburse DOE for such time and expenses, as determined by DOE; and

(2) For all fees and expenses of DOE's independent consultants and outside counsel, to the extent that such fees and expenses are elected to be paid by DOE notwithstanding the provisions of § 609.11.

§ 609.14 Full faith and credit and incontestability.

The full faith and credit of the United States is pledged to the payment of principal and interest of Guaranteed Obligations pursuant to Guarantees issued in accordance with Title XVII and this part. The issuance by DOE of a Guarantee shall be conclusive evidence that it has been properly obtained; that the underlying loan qualified for such Guarantee; and that, but for fraud or material misrepresentation by the Holder, except when the Holder is the Federal Financing Bank, such Guarantee shall be legal, valid, binding, and enforceable against DOE in accordance with its terms.

§ 609.15 Default, demand, payment, and foreclosure on collateral.

(a) If a Borrower defaults in making a required payment of principal or interest on a Guaranteed Obligation and such default has not been cured within the applicable grace period, the Holder may make written demand for payment upon the Secretary in accordance with the terms of the applicable Guarantee. If a Borrower defaults in making a required payment of principal or interest on a Guaranteed Obligation and such default has not been cured within the applicable grace period, the Secretary shall notify the Attorney General.

(b) Subject to the terms of the applicable Guarantee, the Secretary shall make payment within 60 days after receipt of written demand for payment from the Holder, provided that the demand for payment complies in all respects with the terms of the applicable Guarantee. Interest shall accrue to the Holder at the rate stated in the promissory note evidencing the Guaranteed Obligation, without giving effect to the Borrower's default in making a required payment of principal or interest on the applicable Guarantee Obligation or any other default by the Borrower, until the Guaranteed Obligation has been fully paid by DOE. Payment by the Secretary on the applicable Guarantee does not change Borrower's obligations under the promissory note evidencing the Guaranteed Obligation, Loan Guarantee Agreement, Loan Agreement, or related documents, including an obligation to pay default interest.

(c) Following payment by the Secretary pursuant to the applicable Guarantee, upon demand by DOE, the Holder shall transfer and assign to the Secretary (or his or her designee or agent) the promissory note evidencing the Guaranteed Obligation, all rights and interests of the Holder in the Guaranteed Obligation, and all rights and interests of the Holder in respect of the Guaranteed Obligation, except to the extent that the Secretary determines that such promissory note or any of such rights and interests shall not be transferred and assigned to the Secretary. Such transfer and assignment shall include, without limitation, all of the liens, security, and collateral rights of the Holder (or his or her designee or agent) in respect of the Guaranteed Obligation.

(d) Following payment by the Secretary pursuant to a Guarantee or other default of a Guaranteed Obligation, the Secretary is authorized to protect and foreclose on the collateral, take action to recover costs incurred by, and all amounts owed to, the United States as a result of the defaulted Guarantee Obligation, and take such other action necessary or appropriate to protect the interests of the United States. In respect of any such authorized actions that involve a judicial proceeding or other judicial action, the Secretary shall act through the Attorney General. The foregoing provisions of this paragraph (d) shall not relieve the Secretary from his or her obligations pursuant to any applicable Intercreditor Agreement. Nothing in this paragraph (d) shall limit the Secretary from exercising any rights or remedies pursuant to the terms of the Loan Guarantee Agreement.

(e) The cash proceeds received as a result of any foreclosure on the collateral, or other action, shall be distributed in accordance with the Loan Guarantee Agreement (subject to any applicable Intercreditor Agreement).

(f) The Loan Guarantee Agreement shall provide that cash proceeds received by the Secretary (or his or her designee or agent) as a result of any foreclosure on the collateral or other action shall be applied in the following order of priority:

(1) Toward the pro rata payment of any costs and expenses (including unpaid fees, fees and expenses of counsel, contractors and agents, and liabilities and advances made or incurred) of the Secretary, the Attorney General, the Holder, a collateral agent, or other responsible person of any of them (solely in their individual capacities as such and not on behalf of or for the benefit of their principals), incurred in connection with any authorized action following payment by the Secretary pursuant to a Guarantee or other default of a Guaranteed Obligation, or as otherwise permitted under the Loan Agreement or Loan Guarantee Agreement;

(2) To pay all accrued and unpaid fees due and payable to the Secretary, the Attorney General, the Holder, a collateral agent, or other responsible person of any of them on a pro rata basis in respect of the Guaranteed Obligation;

(3) To pay all accrued and unpaid interest due and payable to the Secretary, the Attorney General, the Holder, a collateral agent, or other responsible person of any of them on a pro rata basis in respect of the Guaranteed Obligation;

(4) To pay all unpaid principal of the Guaranteed Obligation;

(5) To pay all other obligations of the Borrower under the Loan Guarantee Agreement, the Loan Agreement, and related documents that are remaining after giving effect to the preceding provisions and are then due and payable; and

(6) To pay to the Borrower, or its successors and assigns, or as a court of competent jurisdiction may direct, any cash proceeds then remaining following the application of all payment described in paragraphs (f)(1) through (5) of this section.

(g) No action taken by the Holder or its agent or designee in respect of any collateral will affect the rights of any person, including the Secretary, having an interest in the Guaranteed Obligations or other debt obligations, to pursue, jointly or severally, legal action against the Borrower or other liable persons, for any amounts owing in respect of the Guaranteed Obligation or other applicable debt obligations.

(h) In the event that the Secretary considers it necessary or desirable to protect or further the interest of the United States in connection with exercise of rights as a lien holder or recovery of deficiencies due under the Guaranteed Obligation, the Secretary may take such action as he determines to be appropriate under the circumstances.

(i) Nothing in this part precludes, nor shall any provision of this part be construed to preclude, the Secretary from purchasing any collateral or Holder's or other Person's interest in the Eligible Project upon foreclosure of the collateral.

(j) Nothing in this part precludes, nor shall any provision of this part be construed to preclude, forbearance by any Holder with the consent of the Secretary for the benefit of the Borrower and the United States.

(k) The Holder and the Secretary may agree to a formal or informal plan of reorganization in respect of the Borrower, to include a restructuring of the Guaranteed Obligation and other applicable debt of the Borrower on such terms and conditions as the Secretary determines are in the best interest of the United States.

§ 609.16 Preservation of collateral.

(a) If the Secretary exercises his or her right under the Loan Guarantee Agreement to require the holder of pledged collateral to take such actions as the Secretary (subject to any applicable Intercreditor Agreement) may reasonably require to provide for the care, preservation, protection, and maintenance of such collateral so as to enable the United States to achieve maximum recovery from the collateral, the Secretary shall, subject to compliance with the Antideficiency Act, 31 U.S.C. 1341 et seq., reimburse the holder of such collateral for reasonable and appropriate expenses incurred in taking actions required by the Secretary (unless otherwise provided in applicable agreements). Except as provided in § 609.15, no party may waive or relinquish, without the consent of the Secretary, any such collateral to which the United States would be subrogated upon payment under the Loan Guarantee Agreement.

(b) In the event of a default, the Secretary may enter into such contracts as he determines are required or appropriate, taking into account the term of any applicable Intercreditor Agreement, to care for, preserve, protect or maintain collateral pledged in respect of Guaranteed Obligations. The cost of such contracts may be charged to the Borrower.

§ 609.17 Audit and access to records.

Each Loan Guarantee Agreement and related documents shall provide that:

(a) The Eligible Lender, or DOE in conjunction with the Federal Financing Bank where loans are funded by the Federal Financing Bank or other Holder or other party servicing the Guaranteed Obligations, as applicable, and the Borrower, shall keep such records concerning the Eligible Project as are necessary, including the Application, Term Sheet, Conditional Commitment, Loan Guarantee Agreement, Credit Agreement, mortgage, note, disbursement requests and supporting documentation, financial statements, audit reports of independent accounting firms, lists of all Eligible Project assets and non-Eligible Project assets pledged in respect of the Guaranteed Obligations, all off-take and other revenue producing agreements, documentation for all Eligible Project indebtedness, income tax returns, technology agreements, documentation for all permits and regulatory approvals, and all other documents and records relating to the Borrower or the Eligible Project, as determined by the Secretary, to facilitate an effective audit and performance evaluation of the Eligible Project; and

(b) The Secretary and the Comptroller General, or their duly authorized representatives, shall have access, for the purpose of audit and examination, to any pertinent books, documents, papers, and records of the Borrower, Eligible Lender, or DOE or other Holder or other party servicing the Guaranteed Obligation, as applicable. Such inspection may be made during regular office hours of the Borrower, Eligible Lender, DOE or other Holder, or other party servicing the Eligible Project and the Guaranteed Obligations, as applicable, or at any other time mutually convenient.

§ 609.18 Deviations.

(a) Subject to the requirements of Title XVII and as otherwise permitted by applicable law, the Secretary may authorize deviations from the requirements of this part upon:

(1) Either receipt from the Applicant, Borrower, or Project Sponsor, as applicable, of—

(i) A written request that the Secretary deviate from one or more requirements; and

(ii) A supporting statement briefly describing one or more justifications for such deviation; or

(iii) A determination by the Secretary in his or her discretion to undertake a deviation;

(2) A finding by the Secretary that such deviation supports program objectives and the special circumstances stated in the request make such deviation clearly in the best interest of the Government; and

(3) If the waiver would constitute a substantial change in the financial terms of the Loan Guarantee Agreement and related documents, DOE's consultation with OMB and the Secretary of the Treasury.

(b) If a deviation under this section results in an increase in the applicable Credit Subsidy Cost, such increase shall be funded either by additional fees paid by the Borrower or on behalf of the Borrower by any third party or, if an appropriation is available, by means of an appropriations act. The Secretary has discretion to determine how the cost of a deviation is funded.

§ 609.19 Title XVII loan guarantee program guidance.

(a) Invitations for the submission of Applications for loan guarantees for Eligible Projects shall be published on DOE's Title XVII Loan Guarantee Program website. The Title XVII Loan Guarantee Program website shall contain guidance for potential Title XVII Applicants and solicit applications for a Guarantee.

(b) The Title XVII Loan Guarantee Program website must include, at a minimum, the following guidance:

(1) The dollar amount of loan guarantee authority potentially being made available by DOE for Guarantees under Title XVII;

(2) The method and further instructions for submission of Applications;

(3) The name and address of the DOE representative whom a potential Applicant may contact to receive further information;

(4) The programmatic, technical, financial, and other factors and criteria that DOE will use to evaluate Applications, including but not limited to consideration of the Reasonable Prospect of Repayment, the amount of Equity provided, and the reliance on other Federal assistance;

(5) The required contents of the Application, which may vary by category of Eligible Project; and

(6) Such other information as DOE may deem appropriate.

(c) Using procedures as may be announced by DOE, a potential Applicant may request a meeting with DOE to discuss its potential Application. At its discretion, DOE may meet with a potential Applicant, either in person or electronically, to discuss its potential Application. DOE's responses to questions from potential Applicants and DOE's statements to potential Applicants, including any initial thoughts on the eligibility of the project, are pre-decisional and preliminary in nature. Any such responses and statements are subject in their entirety to any final action by DOE with respect to an Application submitted in accordance with § 609.4.

PART 611 ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM

Authority: Pub. L. 110-140 (42 U.S.C. 17013), Pub. L. 110-329, Pub. L. 111-85, Pub. L. 117-58.

Source: 73 FR 66731, Nov. 12, 2008, unless otherwise noted.

Subpart A General
§ 611.1 Purpose.

This part is issued by the Department of Energy (DOE) pursuant to section 136 of the Energy Independence and Security Act of 2007, Public Law 110-140, as amended by section 129 of Consolidated Security, Disaster Assistance, and Continuing Appropriations Act of 2009, Public Law 110-329, section 312 of Energy and Water Development and Related Agencies Appropriations Act of 2010, Public Law 111-85, section 40401(b) of the Infrastructure Investment and Jobs Act, Public Law 117-58, and section 50142 of the Inflation Reduction Act of 2022, Public Law 117-169. Specifically, section 136(e) directs DOE to promulgate an interim final rule establishing regulations that specify eligibility criteria and that contain other provisions that the Secretary deems necessary to administer this section and any loans made by the Secretary pursuant to this section.

[89 FR 33202, Apr. 29, 2024]

§ 611.2 Definitions.

The definitions contained in this section apply to provisions contained in both this subpart and subpart B of this part.

Adjusted average fuel economy means a harmonic production weighted average of the combined fuel economy of all vehicles in a fleet, which were subject to CAFE.

Advanced technology vehicle means an on-road advanced technology vehicle or a nonroad advanced technology vehicle.

Agreement means the contractual loan arrangement between DOE and a Borrower for a loan made by and through the Federal Financing Bank with the full faith and credit of the United States Government on the principal and interest.

Applicant means a party that submits a substantially complete application pursuant to this part.

Application means the compilation of the materials required by this part to be submitted to DOE by an Applicant. One Application can include requests for one or more loans and one or more projects. However, an Application covering more than one project must contain complete and separable information with respect to each project.

Automobile is used as that term is defined in 49 CFR part 523.

Borrower means an Applicant that receives a loan under the program under this part.

CAFE means the Corporate Average Fuel Economy program of the Energy Policy and Conservation Act, 49 U.S.C. 32901 et seq.

Combined fuel economy means the combined city/highway miles per gallon values, as are reported in accordance with section 32904 of title 49, United States Code. If CAFE compliance data is not available, the combined average fuel economy of a vehicle must be demonstrated through the use of a peer-reviewed model.

DOE or Department means the United States Department of Energy.

Eligible Facility means a manufacturing facility in the United States that produces qualifying advanced technology vehicles, or qualifying components.

Eligible Project means:

(1) Reequipping, expanding, or establishing a manufacturing facility in the United States to produce qualifying advanced technology vehicles, or qualifying components; or

(2) Engineering integration performed in the United States for qualifying advanced technology vehicles and qualifying components; or

(3) Manufacturing, recycling, processing, reprocessing, remediation, or reuse of materials, components, or subcomponents involving critical minerals, critical minerals production, or the supply chain for such materials, as set forth in Executive Order 13953 (“Executive Order Addressing the Threat to the Domestic Supply Chain from Reliance on Critical Minerals from Foreign Adversaries,” dated September 20, 2020), and Executive Order 13817 (“A Federal Strategy to Ensure Secure and Reliable Supplies of Critical Minerals,” dated December 20, 2017), as amended.

Engineering integration costs are the costs of engineering tasks relating to—

(1) Incorporating qualifying components into the design of advanced technology vehicles; and

(2) Designing tooling and equipment and developing manufacturing processes and material suppliers for production facilities that produce qualifying components or advanced technology vehicles.

Equivalent vehicle means a light-duty vehicle of the same vehicle classification as specified in 10 CFR part 523.

Financially viable means a reasonable prospect that the Applicant will be able to make payments of principal and interest on the loan as and when such payments become due under the terms of the loan documents, and that the Applicant has a net present value that is positive, taking all costs, existing and future, into account.

Grantee means an entity awarded a grant made pursuant to section 136 of the Energy Independence and Security Act of 2007 and this part.

Light-duty vehicle means passenger automobiles and light trucks.

Light truck is used as that term is defined in 49 CFR part 523.

Loan Documents mean the Agreement and all other instruments, and all documentation among DOE, the Borrower, and the Federal Financing Bank evidencing the making, disbursing, securing, collecting, or otherwise administering the loan [references to loan documents also include comparable agreements, instruments, and documentation for other financial obligations for which a loan is requested or issued].

Model year is defined as that term is defined in 49 U.S.C. 32901.

Nonroad advanced technology vehicle means:

(1) A train or locomotive;

(2) A maritime vessel;

(3) An aircraft; and

(4) Hyperloop technology That, in each case, emit, under any possible operational mode or condition, low or zero exhaust emissions of greenhouse gases.

On-road advanced technology vehicle means

(1) An ultra efficient vehicle or a light duty vehicle that meets—

(i) The Bin 5 Tier II emission standard established in regulations issued by the Administrator of the Environmental Protection Agency under section 202(i) of the Clean Air Act (the Act) (42 U.S.C. 7521(i)), as of the date of application, or a lower-numbered Bin emission standard;

(ii) Any new emission standard in effect for fine particulate matter prescribed by the Administrator under the Act (42 U.S.C. 7401 et seq.), as of the date of application; and

(iii) At least 125 percent of the harmonic production weighted average combined fuel economy, for vehicles with substantially similar attributes in model year 2005.

(2) A medium duty vehicle or heavy duty vehicle that exceeds 125 percent of the greenhouse gas emissions and fuel efficiency standards established by the final rule of the Environmental Protection Agency entitled “Greenhouse Gas Emissions and Fuel Efficiency Standards for Medium- and Heavy-Duty Engines and Vehicles—Phase 2” (81 FR 73478 (October 25, 2016)).

Passenger automobile is used as that term is defined in 49 CFR part 523.

Qualifying components means components that the DOE determines are:

(1) Designed for advanced technology vehicles; and

(2) Installed for the purpose of meeting the performance requirements of advanced technology vehicles; or

(3) Involving critical minerals, as set forth in Executive Order 13953 (“Executive Order Addressing the Threat to the Domestic Supply Chain from Reliance on Critical Minerals from Foreign Adversaries,” dated September 20, 2020), and Executive Order 13817 (“A Federal Strategy to Ensure Secure and Reliable Supplies of Critical Minerals,” dated December 20, 2017), as amended, as a component of advanced technology vehicles.

Secretary means the United States Secretary of Energy.

Security means all property, real or personal, tangible or intangible, required by the provisions of the Loan Documents to secure repayment of any indebtedness of the Borrower under the Loan Documents.

Ultra efficient vehicle means a fully closed compartment vehicle designed to carry at least 2 adult passengers that achieves—

(1) At least 75 miles per gallon while operating on gasoline or diesel fuel;

(2) At least 75 miles per gallon equivalent while operating as a hybrid electric-gasoline or electric-diesel vehicle; or

(3) At least 75 miles per gallon equivalent while operating as a fully electric vehicle.

[86 FR 3761, Jan. 15, 2021, as amended at 89 FR 33203, Apr. 29, 2024]

§ 611.3 On-road advanced technology vehicle.

In order to demonstrate that a light duty vehicle is an “on-road advanced technology vehicle”, an automobile manufacturer must provide the following:

(a) Emissions certification. An automobile manufacturer must certify in writing that the vehicle meets, or will meet, the emissions requirements specified in the definition of “on-road advanced technology vehicle”; and

(b) Demonstration of fuel economy performance. An automobile manufacturer must demonstrate that the vehicle has a combined average fuel economy of at least 125 percent of the average combined fuel economy for vehicles with substantially similar attributes for model year 2005.

(1) A combined average fuel economy calculation required under this paragraph for a vehicle that is a dual fueled automobile for the purpose of CAFE is calculated as if the vehicle were not a dual fueled automobile.

(2) The average combined fuel economy for vehicles with substantially similar attributes is a harmonic production weighted average of the combined average fuel economy of all vehicles with substantially similar attributes in model year 2005, as published by DOE.

(3) In the case of an electric drive vehicle with the ability to recharge from an off-board source, an automobile manufacturer must provide DOE with a test procedure and sufficient data to demonstrate that the vehicle meets or exceeds the applicable average combined fuel economy of vehicles with substantially similar attributes.

[73 FR 66731, Nov. 12, 2008, as amended at 89 FR 33203, Apr. 29, 2024]

§ 611.4 Nonroad advanced technology vehicle.

A manufacturer of a nonroad advanced technology vehicle or a manufacturer of a nonroad advanced technology vehicle qualifying component must provide DOE with such information to demonstrate to the satisfaction of DOE that the applicable nonroad advanced technology vehicle emits, under any possible operational mode or condition, low or zero exhaust emissions of greenhouse gases.

[89 FR 33203, Apr. 29, 2024]

Subpart B Direct Loan Program
§ 611.100 Eligible applicant.

(a) In order to be eligible to receive a loan under this part, an applicant

(1) Must be—

(i) An on-road advanced technology vehicle manufacturer that, if it is a light duty vehicle manufacturer, can demonstrate an improved fuel economy as specified in paragraph (b) of this section, or otherwise satisfies the applicable standards set forth in the definition of on-road advanced technology vehicle,

(ii) A manufacturer of a qualifying component, or

(iii) A nonroad advanced technology vehicle manufacturer; and

(2) Must be financially viable without receipt of additional Federal funding associated with the proposed eligible project.

(b) Improved fuel economy. (1) If the applicant is an automobile manufacturer that manufactured in model year 2005, vehicles subject to the CAFE requirements, the applicant must demonstrate that its adjusted average fuel economy for its light-duty vehicle fleet produced in the most recent year for which final CAFE compliance data is available, at the time of application, is greater than or equal to the adjusted average fuel economy of the applicant's fleet for MY 2005, based on the MY 2005 final CAFE compliance data.

(2) If the applicant is an automobile manufacturer that did not manufacture in model year 2005, vehicles subject to the CAFE requirements, the applicant must demonstrate that the projected combined fuel economy for the relevant the advanced technology vehicle that is the subject of the application is greater than or equal to the industry adjusted average fuel economy for model year 2005 of equivalent vehicles, based on final CAFE compliance data.

(3) The CAFE values under this paragraph are to be calculated using the CAFE procedures applicable to the model year being evaluated.

(4) An applicant must provide fuel economy data, at the model level, relied upon to make the demonstration required by this section.

(5) An applicant that is a manufacturer of a qualifying component under paragraph (a)(1)(ii) of this section does not need to make a showing of improved fuel economy under this paragraph.

(c) In determining under paragraph (a)(2) of this section whether an applicant is financially viable, the Department will consider a number of factors, including, but not limited to:

(1) The applicant's debt-to-equity ratio as of the date of the loan application;

(2) The applicant's earnings before interest, taxes, depreciation, and amortization (EBITDA) for the applicant's most recent fiscal year prior to the date of the loan application;

(3) The applicant's debt to EBITDA ratio as of the date of the loan application;

(4) The applicant's interest coverage ratio (calculated as EBITDA divided by interest expenses) for the applicant's most recent fiscal year prior to the date of the loan application;

(5) The applicant's fixed charge coverage ratio (calculated as EBITDA plus fixed charges divided by fixed charges plus interest expenses) for the applicant's most recent fiscal year prior to the date of the loan application;

(6) The applicant's liquidity as of the date of the loan application;

(7) Statements from applicant's lenders that the applicant is current with all payments due under loans made by those lenders at the time of the loan application; and

(8) Financial projections demonstrating the applicant's solvency through the period of time that the loan is outstanding.

(d). For purposes of making a determination under paragraph (a)(2) of this section, additional Federal funding includes any loan, grant, guarantee, insurance, payment, rebate, subsidy, credit, tax benefit, or any other form of direct or indirect assistance from the Federal government, or any agency or instrumentality thereof, other than the proceeds of a loan approved under this Part, that is, or is expected to be made available with respect to, the project for which the loan is sought under this Part.

[73 FR 66731, Nov. 12, 2008, as amended at 89 FR 33203, Apr. 29, 2024]

§ 611.101 Application.

The information and materials submitted in or in connection with applications will be treated as provided in 10 CFR 600.15 and must be marked as provided in 10 CFR 600.15(b). An application must include, at a minimum, the following information and materials:

(a) A certification by the applicant that it meets each of the requirements of the program as set forth in statute, the regulations in this part, and any supplemental requirements issued by DOE;

(b) A description of the nature and scope of the proposed project for which a loan or award is sought under this part, including key milestones and location of the project;

(c) A detailed explanation of how the proposed project qualifies under applicable law to receive a loan or award under this part, including vehicle simulations using industry standard model (need to add name and location of this open source model) to show projected fuel economy;

(d) A detailed estimate of the total project costs together with a description of the methodology and assumptions used to produce that estimate;

(e) A detailed description of the overall financial plan for the proposed project, including all sources and uses of funding, equity, and debt, and the liability of parties associated with the project;

(f) Applicant's business plan on which the project is based and applicant's financial model presenting project pro forma statements for the proposed term of the obligations including income statements, balance sheets, and cash flows. All such information and data must include assumptions made in their preparation and the range of revenue, operating cost, and credit assumptions considered;

(g) An analysis of projected market use for any product (vehicle or component) to be produced by or through the project, including relevant data and assumptions justifying the analysis, and copies of any contractual agreements for the sale of these products or assurance of the revenues to be generated from sale of these products;

(h) Financial statements for the past three years, or less if the applicant has been in operation less than three years, that have been audited by an independent certified public accountant, including all associated notes, as well as interim financial statements and notes for the current fiscal year, of the applicant and parties providing the applicant's financial backing, together with business and financial interests of controlling or commonly controlled organizations or persons, including parent, subsidiary and other affiliated corporations or partners of the applicant;

(i) A list showing the status of and estimated completion date of applicant's required project-related applications or approvals for Federal, state, and local permits and authorizations to site, construct, and operate the project, a period of 5 years preceding the submission of an application under this Part;

(j) Information sufficient to enable DOE to comply with the National Environmental Policy Act of 1969, as required by § 611.106 of this part;

(k) A listing and description of assets associated, or to be associated, with the project and any other asset that will serve as collateral for the Loan, including appropriate data as to the value of the assets and the useful life of any physical assets. With respect to real property assets listed, an appraisal that is consistent with the “Uniform Standards of Professional Appraisal Practice,” promulgated by the Appraisal Standards Board of the Appraisal Foundation, and performed by licensed or certified appraisers, is required;

(l) An analysis demonstrating that, at the time of the application, the applicant is financially viable without receipt of additional Federal funding associated with the proposed project, and that there is a reasonable prospect that the Applicant will be able to make payments of principal and interest on the loan as and when such payments become due under the terms of the loan documents, and that the applicant has a net present value which is positive, taking all costs, existing and future, into account. This information must include, from publicly traded companies, relevant filings with the Securities and Exchange Commission;

(m) Written assurance that all laborers and mechanics employed by contractors or subcontractors during construction, alteration, or repair that is financed, in whole or in part, by a loan under this Part shall be paid wages at rates not less than those prevailing on similar construction in the locality, as determined by the Secretary of Labor in accordance with 40 U.S.C. sections 3141-3144, 3146, and 3147;

(n) Completed Form SF-LLL, as required by 10 CFR Part 601; and

(o) Other information, as determined necessary by DOE.

[73 FR 66731, Nov. 12, 2008, as amended at 76 FR 26583, May 9, 2011]

§ 611.102 Eligible project costs.

(a) Eligible costs are:

(1) Those costs that are reasonably related to the reequipping, expanding, or establishing a manufacturing facility in the United States to produce qualifying advanced technology vehicles or qualifying components;

(2) Costs of engineering integration performed in the United States for qualifying vehicles or qualifying components;

(3) Costs for payment with loan proceeds that are incurred, but not yet paid by the borrower, after a substantially complete application has been submitted to DOE; and

(4) Costs incurred after closing of the loan.

(b) In determining the overall total cost of an Eligible Project, DOE and the applicant may include significant costs already incurred and capitalized by the applicant in accordance with Generally Accepted Accounting Principles and these costs may be considered by DOE in determining the Borrower's contribution to total project costs.

§ 611.103 Application evaluation.

(a) Eligibility screening. Applications will be reviewed to determine whether the applicant is eligible, the information required under § 611.101 is complete, and the proposed loan complies with applicable statutes and regulations. DOE can at any time reject an application, in whole or in part, that does not meet these requirements. Any additional information submitted to DOE will be treated as provided in 10 CFR 600.15 and must be marked as provided in 10 CFR 600.15(b).

(b) Evaluation criteria. Applications that are determined to be eligible pursuant to paragraph (a) of this section shall be subject to a substantive review by DOE based upon factors that include, but are not limited to, the following:

(1) The technical merit of the proposed advanced technology vehicles or qualifying components, with greater weight given for factors including, but not limited to:

(i) Improved vehicle fuel economy above that required for an advanced technology vehicle;

(ii) Potential contributions to improved fuel economy of the U.S. light-duty vehicle fleet;

(iii) Likely reductions in petroleum use by the U.S. light-duty fleet; and

(iv) Promotion of use of advanced fuel (e.g., E85, ultra-low sulfur diesel).

(2) Technical Program Factors such as economic development and diversity in technology, company, risk, and geographic location.

(3) The adequacy of the proposed provisions to protect the Government, including sufficiency of Security, the priority of the lien position in the Security, and the percentage of the project to be financed with the loan.

(4) In making loans to those manufacturers that have existing facilities, priority will be given to those facilities that are oldest or have been in existence for at least 20 years even if such facilities are idle at the time of application.

[73 FR 66731, Nov. 12, 2008, as amended at 76 FR 26583, May 9, 2011]

§ 611.104 [Reserved]
§ 611.105 Agreement.

(a) Only an Agreement executed by a duly authorized DOE Contracting Officer can contractually obligate the government to make a loan made by and through the Federal Financing Bank with the full faith and credit of the United States government on the principal and interest.

(b) DOE is not bound by oral representations made during the Application stage, or during any negotiation process.

(c) No funds obtained from the Federal Government, or from a loan or other instrument guaranteed by the Federal Government, may be used to pay administrative fees, or other fees charged by or paid to DOE relating to the section 136 loan program.

(d) Prior to the execution by DOE of an Agreement, DOE must ensure that the following requirements and conditions, which must be specified in the Agreement, are satisfied:

(1) The Borrower is a Eligible Applicant as defined in this part;

(2) The Agreement is for an Eligible Project as defined in this part;

(3) The principal amount of the loan is limited to no more than 80 percent of reasonably anticipated total Project Costs;

(4) Loan funds will be disbursed only to meet immediate cash disbursement needs of the Borrower and not for investment purposes, and any investment earnings obtained in excess of accrued interest expense will be returned to United States Government; and

(5) Such documents, representations, warrants and covenants as DOE may require.

§ 611.106 Environmental requirements.

(a)(1) In general. Environmental review of the proposed projects under this part will be conducted in accordance with applicable statutes, regulations, and Executive Orders.

(2) The applicant must submit a comprehensive environmental report. The comprehensive environmental report shall consist of the specific reports and related material set forth in paragraphs (d) through (f) of this section.

(3) The regulations of the Council on Environmental Quality implementing NEPA require DOE to provide public notice of the availability of project specific environmental documents such as environmental impact statements, environmental assessments, findings of no significant impact, records of decision etc., to the affected public. See 40 CFR 1506.6(b). The comprehensive environmental report will provide substantial basis for any required environmental impact statement or environmental assessment and findings of no significant impact, pursuant to the procedures set forth in 10 CFR 1021.215. DOE may also make a determination as to whether a categorical exclusion is available with regard to an Application.

(b) The detail of each specific report must be commensurate with the complexity of the proposal and its potential for environmental impact. Each topic in each specific report shall be addressed or its omission justified, unless the specific report description indicates that the data is not required for that type of project. If material required for one specific report is provided in another specific report or in another exhibit, it may be incorporated by reference. If any specific report topic is required for a particular project but is not provided at the time the application is filed, the comprehensive environmental report shall explain why it is missing and when the applicant anticipates it will be filed.

(c) As appropriate, each specific report shall:

(1) Address conditions or resources that might be directly or indirectly affected by the project;

(2) Identify significant environmental effects expected to occur as a result of the project;

(3) Identify the effects of construction, operation (including maintenance and malfunctions), and termination of the project, as well as cumulative effects resulting from existing or reasonably foreseeable projects;

(4) Identify measures proposed to enhance the environment or to avoid, mitigate, or compensate for adverse effects of the project; and

(5) Provide a list of publications, reports, and other literature or communications that were cited or relied upon to prepare each report.

(d) Specific Report 1—Project impact and description. This report must describe the environmental impacts of the project, facilities associated with the project, special construction and operation procedures, construction timetables, future plans for related construction, compliance with regulations and codes, and permits that must be obtained.

(e) Specific Report 2—Socioeconomics. This report must identify and quantify the impacts of constructing and operating the proposed project on factors affecting towns and counties in the vicinity of the project. The report must:

(1) Describe the socioeconomic impact area;

(2) Evaluate the impact of any substantial immigration of people on governmental facilities and services and plans to reduce the impact on the local infrastructure;

(3) Describe on-site manpower requirements and payroll during construction and operation, including the number of construction personnel who currently reside within the impact area, would commute daily to the site from outside the impact area, or would relocate temporarily within the impact area;

(4) Determine whether existing housing within the impact area is sufficient to meet the needs of the additional population;

(5) Describe the number and types of residences and businesses that would be displaced by the project, procedures to be used to acquire these properties, and types and amounts of relocation assistance payments; and

(6) Conduct a fiscal impact analysis evaluating incremental local government expenditures in relation to incremental local government revenues that would result from construction of the project. Incremental expenditures include, but are not limited to, school operating costs, road maintenance and repair, public safety, and public utility costs.

(f) Specific Report 3—Alternatives. This report must describe alternatives to the project and compare the environmental impacts of such alternatives to those of the proposal. The discussion must demonstrate how environmental benefits and costs were weighed against economic benefits and costs, and technological and procedural constraints. The potential for each alternative to meet project deadlines and the environmental consequences of each alternative shall be discussed. The report must discuss the “no action” alternative and the potential for accomplishing the proposed objectives through the use of other means. The report must provide an analysis of the relative environmental benefits and costs for each alternative.

§ 611.107 Loan terms.

(a) All loans provided under this part shall be due and payable in full at the earlier of:

(1) the projected life, in years, of the Eligible facility that is built or installed as a result of the Eligible Project carried out using funds from the loan, as determined by the Secretary; or

(2) Twenty-five (25) years after the date the loan is closed.

(b) Loans provided under the Part must bear a rate of interest that is equal to the rate determined by the Secretary of the Treasury, taking into consideration current market yields outstanding marketable obligations of the United States of comparable maturity. This rate will be determined separately for each drawdown of the loan.

(c) A loan provided under this part may be subject to a deferral in repayment of principal for not more than 5 years after the date on which the Eligible facility that is built or installed as a result of the Eligible Project first begins operations, as determined by the Secretary.

(d)(1) The performance of all of the Borrower's obligations under the Loan Documents shall be secured by, and shall have the priority in, such Security as provided for within the terms and conditions of the Loan Documents.

(2) Accordingly, the rule states that the Secretary must have a first lien or security interest in all property acquired with loan funds. This requirement may be waived only by the Secretary on a non-delegable basis. DOE must also have a lien on any other property of the applicant pledged to secure the loan.

(3) In the event of default, if recoveries from the property and revenues pledged to the repayment of the loan are insufficient to fully repay all principal and interest on the loan, then the Federal Government will have recourse to the assets and revenues of the Borrower to the same extent as senior unsecured general obligations of the Borrower.

(e) The Borrower will be required to pay at the time of the closing of the loan a fee equal to 10 basis points of the principal amount of the loan.

§ 611.108 Perfection of liens and preservation of collateral.

(a) The Agreement and other documents related thereto shall provide that:

(1) DOE and the Applicant, in conjunction with the Federal Financing Bank if necessary, will take those actions necessary to perfect and maintain liens, as applicable, on assets which are pledged as collateral for the loan; and

(2) Upon default by the Borrower, the holder of pledged collateral shall take such actions as DOE may reasonably require to provide for the care, preservation, protection, and maintenance of such collateral so as to enable the United States to achieve maximum recovery from the pledged assets. DOE shall reimburse the holder of collateral for reasonable and appropriate expenses incurred in taking actions required by DOE.

(b) In the event of a default, DOE may enter into such contracts as the Secretary determines are required to preserve the collateral. The cost of such contracts may be charged to the Borrower.

§ 611.109 Audit and access to records.

(a) The Agreement and related documents shall provide that:

(1) DOE in conjunction with the Federal Financing Bank, as applicable, and the Borrower, shall keep such records concerning the project as are necessary, including the Application, Term Sheet, Conditional Commitment, Agreement, mortgage, note, disbursement requests and supporting documentation, financial statements, audit reports of independent accounting firms, lists of all project assets and non-project assets pledged as security for the loan, all off-take and other revenue producing agreements, documentation for all project indebtedness, income tax returns, technology agreements, documentation for all permits and regulatory approvals and all other documents and records relating to the Eligible Project, as determined by the Secretary, to facilitate an effective audit and performance evaluation of the project; and

(2) The Secretary and the Comptroller General, or their duly authorized representatives, shall have access, for the purpose of audit and examination, to any pertinent books, documents, papers and records of the Borrower or DOE, as applicable. Such inspection may be made during regular office hours of the Borrower or DOE, as applicable, or at any other time mutually convenient.

(b) The Secretary may from time to time audit any or all statements or certificates submitted to the Secretary. The Borrower will make available to the Secretary all books and records and other data available to the Borrower in order to permit the Secretary to carry out such audits. The Borrower should represent that it has within its rights access to all financial and operational records and data relating to the project financed by the loan, and agrees that it will, upon request by the Secretary, exercise such rights in order to make such financial and operational records and data available to the Secretary. In exercising its rights hereunder, the Secretary may utilize employees of other Federal agencies, independent accountants, or other persons.

(c) Loan funds are being expended efficiently and effectively if documentation submitted and audits conducted under this section demonstrate that the borrower is making appropriate progress toward achieving the purpose for which the loan was originally made.

§ 611.110 Assignment or transfer of loans.

(a) The Loan Documents may not be modified, in whole or in part, without the prior written approval of DOE.

(b) Upon prior written approval by DOE and the Federal Financing Bank, a certification by the assignor that the assignee is an Eligible Applicant as described in § 611.100 of this part, and subject to paragraph (c) of this section and other provisions of this part, a Borrower may assign or transfer its interest in a loan provided under this part, including the loan documents, to a party that qualifies as an Eligible Applicant.

(c) The provisions of paragraph (b) of this section shall not apply to transfers which occur by operation of law.

§ 611.111 Default, demand, payment, and collateral liquidation.

(a) In the event that the Borrower has defaulted in the making of required payments of principal or interest, and such default has not been cured within the period of grace provided in the Agreement, DOE may cause the principal amount of the loan, together with accrued interest thereon, and all amounts owed to the United States by Borrower pursuant to the Agreement, to become immediately due and payable by giving the Borrower written notice to such effect.

(b) In the event that the Borrower is in default as a result of a breach of one or more of the terms and conditions of the Agreement, note, mortgage, or other contractual obligations related to the transaction, other than the Borrower's obligation to pay principal or interest on the loan, and DOE determines, in writing, that such a default has materially affected the rights of the parties, the Borrower shall be given the period of grace provided in the Agreement to cure such default. If the default is not cured during the period of grace, DOE may cause the principal amount of the loan, together with accrued interest thereon, and all amounts owed to the United States by Borrower pursuant to the Agreement, to become immediately due and payable by giving the Borrower written notice to such effect.

(c) In the event that the Borrower has defaulted as described in paragraphs (a) or (b) of this section and such default is not cured during the grace period provided in the Agreement, DOE shall notify the U.S. Attorney General. DOE, acting through the U.S. Attorney General, may seek to foreclose on the collateral assets and/or take such other legal action as necessary for the protection of the Government.

(d) If DOE is awarded title to collateral assets pursuant to a foreclosure proceeding, DOE may take action to complete, maintain, operate, or lease the Eligible Facilities, or otherwise dispose of any property acquired pursuant to the Agreement or take any other necessary action which DOE deems appropriate.

(e) In addition to foreclosure and sale of collateral pursuant thereto, the U.S. Attorney General shall take appropriate action in accordance with rights contained in the Agreement to recover costs incurred by the Government as a result of the defaulted loan or other defaulted obligation. Any recovery so received by the U.S. Attorney General on behalf of the Government shall be applied in the following manner: First to the expenses incurred by the U.S. Attorney General and DOE in effecting such recovery; second, to reimbursement of any amounts paid by DOE as a result of the defaulted obligation; third, to any amounts owed to DOE under related principal and interest assistance contracts; and fourth, to any other lawful claims held by the Government on such process. Any sums remaining after full payment of the foregoing shall be available for the benefit of other parties lawfully entitled to claim them.

(f) In the event that DOE considers it necessary or desirable to protect or further the interest of the United States in connection with the liquidation of collateral or recovery of deficiencies due under the loan, DOE will take such action as may be appropriate under the circumstances.

§ 611.112 Termination of obligations.

DOE, the Federal Financing Bank, and the Borrower shall have such rights to terminate the Agreement as are set forth in the loan documents.

Subpart C Facility/Funding Awards
§ 611.200 Purpose and scope.

This subpart sets forth the policies and procedures applicable to the award and administration of grants by DOE for advanced technology vehicle manufacturing facilities as authorized by section 136(b) of the Energy Independence and Security Act (Pub. L. 110-140).

§ 611.201 Applicability.

Except as otherwise provided by this subpart, the award and administration of grants shall be governed by 10 CFR part 600 (DOE Financial Assistance Rules).

§ 611.202 Advanced Technology Vehicle Manufacturing Facility Award Program.

DOE may issue, under the Advanced Technology Vehicle Manufacturing Facility Award Program, 10 CFR part 611, subpart C, awards for eligible projects.

§ 611.203 Eligibility.

In order to be eligible for an award, an applicant must be either—

(a) An automobile manufacturer that can demonstrate an improved fuel economy as specified in paragraph (b) of section 611.3, or

(b) A manufacturer of a qualifying component.

§ 611.204 Awards.

Awards issued for eligible projects shall be for an amount of no more than 30 percent of the eligible project costs.

§ 611.205 Period of award availability.

An award under section 611.204 shall apply to—

(a) Facilities and equipment placed in service before December 30, 2020; and

(b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December 30, 2020.

§ 611.206 Existing facilities.

The Secretary shall, in making awards to those manufacturers that have existing facilities, give priority to those facilities that are oldest or have been in existence for at least 20 years. Such facilities can currently be sitting idle.

§ 611.207 Small automobile and component manufacturers.

(a) In this section, the term “covered firm” means a firm that—

(1) Employs less than 500 individuals; and

(2) Manufactures automobiles or components of automobiles.

(b) Set Aside—Of the amount of funds that are used to provide awards for each fiscal year under this subpart, not less than 10 percent shall be used to provide awards to covered firms or consortia led by a covered firm.

§§ 611.208-611.209 [Reserved]

PART 612 RECAPTURE OF CIVIL NUCLEAR CREDITS

Authority: 42 U.S.C. 7254; 42 U.S.C. 18753.

Source: 89 FR 871, Jan. 8, 2024, unless otherwise noted.

§ 612.1 Purpose.

This part implements section 40323(g)(2) of the Infrastructure Investment and Jobs Act (Pub. L. 117-58), codified at 42 U.S.C. 18753(g)(2), to set forth the procedure to recapture credits awarded pursuant to the civil nuclear credit program.

§ 612.2 Applicability.

This part applies to an owner/operator of a nuclear reactor that is awarded credits pursuant to the civil nuclear credit program.

§ 612.3 Definitions.

Award period means the period beginning with the first day of the award year for which the owner/operator has been awarded credits up to and including the last day of the fourth award year thereafter.

Award year means a 12-month period beginning on the effective date of the award of credits and each anniversary thereof during the award period.

CNC program means the civil nuclear credit program established by the Secretary pursuant to section 40323 of the Infrastructure Investment and Jobs Act (Pub. L. 117-58) codified at 42 U.S.C. 18753.

Credits means the credits awarded to an owner/operator of a nuclear reactor projected to cease operations due to economic factors and certified by the Department as part of the CNC program.

Department means the Department of Energy.

Nuclear reactor means a nuclear power reactor unit with respect to which an owner/operator has been awarded credits pursuant to the civil nuclear credit program.

Owner/operator means the owner or operator of a nuclear reactor that has been awarded credits pursuant to the civil nuclear credit program.

Secretary means the Secretary of Energy.

§ 612.4 Recapture.

(a) Credits allocated to an owner/operator shall be subject to recapture—

(1) If the nuclear reactor terminates operations during the award period, pursuant to paragraph (b) of this section; or

(2) At the conclusion of the award period, if the nuclear reactor would not have operated at an annual loss in the absence of the credits, pursuant to paragraph (c) of this section.

(b) If the Department determines that a nuclear reactor has terminated operations during the award period, then the Department will recapture the award of credits for the award year in which the termination of operations occurred and for any remaining award years by rescinding the credits awarded but not paid, and the owner/operator shall have no further rights to any credits. In addition, the value of credits that the Department has previously paid to the owner/operator with respect to a prior award year shall be repaid to the Department by the owner/operator if the Department determines that the nuclear reactor terminated operations as a result of the owner/operator's failure to adhere to prudent industry practice in the operation of the nuclear reactor during the award period.

(c) Following the conclusion of the award period, the Department will determine whether, for the award period, the nuclear reactor would not have operated at an annual loss in the absence of the credits. The amount subject to recapture following the conclusion of the award period shall be determined in the same manner that the annual adjustment of credits is calculated under the terms of the award of such credits.

§ 612.5 Notice of recapture; request for reconsideration; effectiveness of recapture.

(a) Notice of recapture determination. If pursuant to § 612.4, the Department determines that:

(1) An amount of credits not yet paid should be recaptured; and

(2) That any credits previously paid to the owner/operator should be recaptured, the Secretary will provide to an owner/operator a written notice of the amount of credits subject to the recapture determination and the value of credits that the Department has previously paid to an owner/operator and that are subject to recapture, if any, with an explanation of such amount.

(b) Request for reconsideration. Unless the Department extends the time period, within 30 calendar days of receipt of a notice of recapture provided to an owner/operator under paragraph (a) of this section, an owner/operator may submit a written request to the Department requesting reconsideration of the recapture determination. To request reconsideration of the recapture determination, an owner/operator must submit to the Department a written request that includes:

(1) An explanation of why the owner/operator believes all or some of the credits (and the value of any credits previously paid) should not be subject to recapture; and

(2) Supporting information and calculations.

(c) Notification of final amount subject to recapture. Unless the Department extends the time period, within 60 days of receipt of an owner/operator's request for reconsideration provided pursuant to paragraph (b) of this section, the owner/operator will be notified of the Department's decision to affirm, withdraw, or modify the notice of recapture. The notification will include an explanation of the decision, including responses to the owner/operator's supporting reasons and consideration of additional information provided.

(d) Effectiveness of recapture. (1) If the owner/operator has not requested reconsideration as provided in paragraph (b) of this section;

(i) The credits will be deemed to be recaptured as of the date of the notification provided by the Secretary pursuant to paragraph (a) of this section and the owner/operator will have no further right or claim to those credits; and

(ii) The owner/operator shall repay to the Department the value of credits that the Department has paid to the owner/operator and that are subject to recapture under § 612.4 within 30 calendar days of the date of notification provided by the Department pursuant to paragraph (a) of this section.

(2) If the owner/operator has requested reconsideration as provided in paragraph (b) of this section;

(i) The credits will be deemed to be recaptured as of the date of the notification provided by the Department pursuant to paragraph (c) of this section and the owner/operator will have no further right or claim to those credits; and

(ii) The owner/operator shall pay to the Department the value of credits that the Department has previously paid to the owner/operator and that are subject to recapture under § 612.4 within 30 calendar days of the date of notification provided by the Department pursuant to paragraph (c) of this section.

(e) Notice. Notices issued by the Department under this section shall be made public by the Department, with the exception of any data or supporting documentation constituting confidential business information not subject to disclosure.

§ 612.6 Petition to the Department's Office of Hearings and Appeals.

In order to exhaust its administrative remedies, an owner/operator who is aggrieved by the Secretary's decision to affirm, withdraw, or modify the notice of recapture as provided in § 612.5(c) may file a petition with the Department's Office of Hearings and Appeals in accordance with 10 CFR 1003.11 not later than thirty days after notification of the Department's decision.

SUBCHAPTER I SALES REGULATION

PART 622 CONTRACTUAL PROVISIONS

§ 622.103 Dispute provisions.

(a) Except as provided in paragraph (b) of this section, all DOE contracts for the sale of personal property to any organization outside the U.S. Government shall include a Disputes clause which provides for:

(1) Binding final decisions by the Contracting Officer, subject to appeal;

(2) Appeal rights pursuant to the Contract Disputes Act of 1978;

(3) Continuation of performance by the contractor at the direction of the contracting officer pending final resolution of the dispute.

(b) Exceptions:

(1) The provisions of this part shall not apply to contracts for sale of electric power by the Power Marketing Administrations;

(2) The Secretary may exempt a contract or class of contracts from this requirement upon determination that it would not be in the public interest in an individual contract or class of contracts with a foreign government, or agency thereof, or international organization, or subsidiary body thereof, to include the Disputes clause, as permitted by section 3 of the Contract Disputes Act of 1978.

(c) The Energy Board of Contract Appeals (EBCA) has cognizance over disputes relating to DOE Sales contracts.

(d) The Disputes clause in § 624.102-4 shall be used in accordance with this § 622.103.

(Sec. 644, Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 599 (42 U.S.C. 7254))

[46 FR 34559, July 2, 1981]

PART 624 CONTRACT CLAUSES

§ 624.102-4 Disputes.

The following clause shall be used in accordance with the provisions of § 622.103:

Disputes

(a) This contract is subject to the Contract Disputes Act of 1978 (41 U.S.C. 601 et seq.). If a dispute arises relating to the contract, the purchaser may submit a claim to the Contracting Officer who shall issue a written decision on the dispute.

(b) Claim means:

(1) A written request submitted to the Contracting Officer;

(2) For payment of money, adjustment of contract terms, or other relief;

(3) Which is in dispute or remains unresolved after a reasonable time for its review and disposition by the Government; and

(4) For which a Contracting Officer's decision is demanded.

(c) In the case of disputed requests or amendments to such requests for payment exceeding $50,000, or with any amendment causing the total request in dispute to exceed $50,000, the purchaser shall certify, at the time of submission of a claim, as follows:

I certify that the claim is made in good faith, that the supporting data is accurate and complete to the best of my knowledge and belief, and that the amount requested accurately reflects the contract adjustment for which the Purchaser believes the Government is liable.

(Purchaser's Name) (Title)

(d) The Government shall pay the Purchaser interest.

(1) On the amount found due to the purchaser and unpaid on claims submitted under this clause;

(2) At the rates fixed by the Secretary of the Treasury;

(3) From the date the amount is due until the Government makes payment.

(e) The purchaser shall pay the Government interest:

(1) On the amount found due to the Government and unpaid on claims submitted under this clause;

(2) At the rates fixed by the Department of Energy for the payment of interest on past due accounts;

(3) From the date the amount is due until the purchaser makes payment.

(f) The decision of the Contracting Officer shall be final and conclusive and not subject to review by any forum, tribunal, or Government agency unless an appeal or action is timely commenced within the times specified by the Contract Disputes Act of 1978.

(g) The purchaser shall comply with any decision of the Contracting Officer and at the direction of the Contracting Officer shall proceed diligently with performance of this contract pending final resolution of any request for relief, claim, appeal, or action related to this contract.

(Sec. 644, Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 599 (42 U.S.C. 7254))

PART 625 PRICE COMPETITIVE SALE OF STRATEGIC PETROLEUM RESERVE PETROLEUM

Authority: 15 U.S.C. 761; 42 U.S.C. 7101; 42 U.S.C. 6201.

Source: 48 FR 56541, Dec. 21, 1983, unless otherwise noted.

§ 625.1 Application and purpose.

This part shall apply to all price competitive sales of SPR petroleum by DOE. This section provides the rules for developing standard contract terms and conditions and financial and performance responsibility measures; notifying potential purchasers of those terms, conditions and measures; choosing applicable terms, conditions and measures for each sale of SPR petroleum; and notifying potential purchasers of which terms, conditions and measures will be applicable to particular sales of SPR petroleum.

§ 625.2 Definitions.

(a) DOE. DOE is the Department of Energy established by Public Law 95-91 (42 U.S.C. 7101 et seq.) and any component thereof including the SPR Office.

(b) Notice of Sale. The Notice of Sale is the document announcing the sale of SPR petroleum, the amount, type and location of the petroleum being sold, the delivery period and the procedures for submitting offers. The Notice of Sale will specify which contractual provisions and financial and performance responsibility measures are applicable to that particular sale of petroleum, and will provide other pertinent information.

(c) Petroleum. Petroleum means crude oil, residual fuel oil or any refined petroleum product (including any natural gas liquid and any natural gas liquid product) owned or contracted for by DOE and in storage in any permanent SPR facility, or temporarily stored in other storage facilities, or in transit to such facilities (including petroleum under contract but not yet delivered to a loading terminal).

(d) Price Competitive Sale. A price competitive sale of SPR petroleum is one in which contract awards are made to those responsive, responsible persons offering the highest prices; sales conducted pursuant to rules adopted under section 161(e) of the Energy Policy and Conservation Act (EPCA), Public Law 94-163 (42 U.S.C. 6201 et seq.), are not price competitive sales.

(e) Purchaser. A purchaser is any person or entity (including a Government agency) which enters into a contract with DOE to purchase SPR petroleum.

(f) SPR. SPR is the Strategic Petroleum Reserve, that program of the Department of Energy established by title I, part B of EPCA.

(g) Standard Sales Provisions. The Standard Sales Provisions are a set of terms and conditions of sale, which may contain or describe financial and performance responsibility measures, for petroleum sold from the SPR under this part.

§ 625.3 Standard sales provisions.

(a) Contents. The Standards Sales Provisions shall contain contract clauses which may be applicable to price competitive sales of SPR petroleum, including terms and conditions of sale, and purchaser financial and performance responsibility measures, or descriptions thereof. At his discretion, the Secretary or his designee may specify in a Notice of Sale which of such terms and conditions, or financial and performance responsibility measures, shall apply to a particular sale of SPR petroleum; and, he may specify any revisions in such terms, conditions and measures, and any additional terms, conditions and measures which shall be applicable to that sale, that are consistent with the SPR Drawdown Plan adopted on December 1, 1982.

(b) Acceptance by offerors. All offerors must, as part of their offers for SPR petroleum in response to a Notice of Sale, agree without exception to all contractual provisions and financial and performance responsibility measures which the Notice of Sale makes applicable to the particular sale.

(c) Award of contracts. No contract for the sale of SPR petroleum may be awarded to any offeror who has not unconditionally agreed to all contractual provisions and financial and performance responsibility measures which the Notice of Sale makes applicable to the particular sale.

(d) Contract documents. The terms and conditions which the Notice of Sale makes applicable to a particular sale may be incorporated into a contract for the sale of SPR petroleum by reference to the Notice of Sale.

§ 625.4 Publication of the Standard Sales Provisions.

(a) Publication. The Standard Sales Provisions shall be published on the U.S. Department of Energy Strategic Petroleum Reserve website (https://www.energy.gov/fe/services/petroleum-reserves/strategic-petroleum-reserve).

(b) Revisions of the Standard Sales Provisions. The Standard Sales Provisions shall be reviewed on a continuous basis and republished on the Department of Energy Strategic Petroleum Reserve website. Notification of revisions of the Standard Sales Provisions shall be made in the Federal Register and sent to existing registered users in the SPR sales system.

(c) Notification of applicable clauses. The Notice of Sale will specify, by referencing the Department of Energy Strategic Petroleum Reserve website, which contractual terms and conditions and contractor financial and performance responsibility measures contained or described therein are applicable to that particular sale.

[84 FR 8794, Mar. 12, 2019]

§ 625.5 Failure to perform in accordance with SPR Contracts of Sale.

(a) Ineligibility. In addition to any remedies available to the Government under the Contract of Sale, in the event that a purchaser fails to perform in accordance with applicable SPR petroleum sale contractual provisions, and such failure is not excused by those provisions, the Headquarters Senior Procurement Official, at his discretion, may make such purchaser ineligible for future awards of SPR petroleum sales contracts.

(b) Determination of ineligibility. No purchaser shall be made ineligible for the award of any SPR sales contract prior to notice and opportunity to respond in accordance with the requirements of this subsection.

(1) Upon the determination that a purchaser is to be considered for ineligibility, the purchaser shall be sent by certified mail return receipt requested, the following:

(i) Notification that the Headquarters Senior Procurement Official is considering making the purchaser ineligible for future awards;

(ii) Identification of the SPR sales contract which the purchaser failed to comply with, along with a brief description of the events and circumstances relating to such failure;

(iii) Advice that the purchaser may submit in writing for consideration by the Headquarters Senior Procurement Official in determining whether or not to impose ineligibility on the purchaser, any information or argument in opposition to the ineligibility; and

(iv) Advice that such information or argument in opposition to the ineligibility must be submitted within a certain time in order to be considered by the Headquarters Senior Procurement Official, such time to be not less than 21 days.

(2) After elapse of the time period established under paragraph (b)(1) of this section for receipt of the purchaser's response, the Headquarters Senior Procurement Official, at his discretion, and after consideration of the purchaser's written response, if any, may make the purchaser ineligible for future awards of SPR petroleum sales contracts. Such ineligibility shall continue for the time period determined by the Headquarters Senior Procurement Official, as appropriate under the circumstances.

(3) The purchaser shall be notified of the Headquarters Senior Procurement Official's decision.

(c) Reconsideration. Any purchaser who has been excluded from participating in any SPR sale under paragraph (a) may request that the Headquarters Senior Procurement Offical reconsider the purchaser's ineligibility. The Headquarters Senior Procurement Official, at his discretion, may reinstate any such purchaser to eligibility for future competitive sales.

PART 626 PROCEDURES FOR ACQUISITION OF PETROLEUM FOR THE STRATEGIC PETROLEUM RESERVE

Authority: 42 U.S.C. 6240(c); 42 U.S.C. 7101, et seq.

Source: 87 FR 64372, Oct. 25, 2022, unless otherwise noted.

§ 626.1 Purpose.

This part establishes the procedures for acquiring petroleum products for, and deferring contractually scheduled deliveries to, the Strategic Petroleum Reserve. The procedures do not represent actual terms and conditions to be contained in the contracts for the acquisition of SPR petroleum products.

§ 626.2 Definitions.

Backwardation means a market situation in which prices are progressively lower in succeeding delivery months than in earlier months.

Contango means a market situation in which prices are progressively higher in the succeeding delivery months than in earlier months.

Contract means the agreement under which DOE acquires SPR petroleum products, consisting of the solicitation, the contract form signed by both parties, the successful offer, and any subsequent modifications, including those granting requests for deferrals.

Contracting Officer means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings, including entering into sales contracts on behalf of the Government. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

DEAR means the Department of Energy Acquisition Regulation.

Deferral means a process whereby petroleum products scheduled for delivery to the SPR in a specific contract period is rescheduled for later delivery, outside of that period, and encompasses the future delivery of the originally scheduled quantity plus an in-kind premium.

DOE means the Department of Energy and includes any of its subsidiary offices, such as the Office of Petroleum Reserves (OPR) and the Strategic Petroleum Reserve Program Management Office.

Exchange means a process whereby petroleum products owned by or due to the SPR are provided to an entity or requestor in return for petroleum products of comparable quality plus a premium quantity of petroleum products (in barrels)—or another form of premium as permitted by law—delivered to the SPR in the future, or when SPR petroleum products are traded for petroleum products of a different quality preferred by DOE for operational reasons based on the relative values of the quantities traded.

FAR means the Federal Acquisition Regulation.

Government means the United States Government and includes DOE as its representative.

OPR means the Office of Petroleum Reserves within DOE, whose responsibilities include the operation of the Strategic Petroleum Reserve.

Petroleum products means crude oil, residual fuel oil, or any refined product (including any natural gas liquid, and any natural gas liquid product) owned, or contracted for, by DOE and in storage in any permanent SPR facility, or temporarily stored in other storage facilities.

Premium means the additional amount of petroleum product (in barrels)—or another form of payment as permitted by law—that must be delivered to the SPR above the principal amount of petroleum product owed to SPR in the case of an exchange or a deferred contractually scheduled delivery. The premium may include a calculation based on a rate set by DOE and duration of time until the SPR receives the petroleum product.

Requestor is an entity that makes an emergency request under § 626.7(b).

Secretary means the Secretary of Energy.

Solicitation means the written request by DOE for submission of offers or quotations to DOE for the acquisition of petroleum products.

Strategic Petroleum Reserve or SPR means the reserve for the storage of up to 1 billion barrels of petroleum products established by Title I, Part B, of the Energy Policy and Conservation Act, 42 U.S.C. 6201 et seq.

§ 626.3 Applicability.

The procedures in this part apply to the acquisition of petroleum products by DOE for the Strategic Petroleum Reserve through purchase or exchange, as well as to deferrals of contractually scheduled deliveries.

§ 626.4 General acquisition strategy.

(a) Criteria for commencing acquisition. DOE shall consider the following factors prior to commencing acquisition of petroleum products for the SPR:

(1) The current inventory of the SPR;

(2) The current level of private inventories;

(3) Days of net import protection;

(4) Current price levels for petroleum products and related commodities, the ability to minimize costs and avoid incurring excessive costs in acquisition, and the possible effect on consumer and market prices of any SPR acquisition;

(5) The outlook for international and domestic production levels;

(6) Existing or potential disruptions in supply or refining capability;

(7) The level of market volatility;

(8) Futures market price differentials for petroleum products and related commodities;

(9) The need to protect national security; and

(10) Any other factor the Secretary deems necessary or appropriate to consider.

(b) Review of rate of acquisition. DOE shall review the appropriate rate of petroleum product acquisition each time an open market acquisition has been suspended for more than three months.

(c) Acquisition through other Federal agencies. DOE may enter into arrangements with another Federal agency for that agency to acquire petroleum products for the SPR on behalf of DOE.

§ 626.5 Acquisition procedures—general.

(a) Notice of acquisition. (1) Except when DOE has determined there is good cause to do otherwise, DOE shall provide advance public notice of its intent to acquire petroleum products for the SPR. The notice of acquisition will, to the extent feasible, include the general terms and details of DOE's petroleum products acquisition and inform the public of DOE's overall fill goals.

(2) The notice of acquisition will generally include the:

(i) Manner of acquisition;

(ii) Time period for solicitations;

(iii) Quantity of petroleum products sought;

(iv) Minimum petroleum product quality requirements;

(v) Time period for delivery;

(vi) Acceptable delivery locations; and

(vii) Instructions for the offer process.

(b) Manner of acquisition. (1) DOE shall specify the manner of petroleum product acquisition, either purchase or exchange, in the notice of acquisition.

(2) DOE shall, to the greatest extent practicable, determine the manner of petroleum product acquisition after considering:

(i) The availability of appropriated funds;

(ii) Minimization of costs;

(iii) Minimization of the Nation's vulnerability to a severe energy supply interruption;

(iv) Minimization of the impact to supply levels and market forces;

(v) Whether the manner of acquisition would encourage competition in the petroleum industry; and

(vi) Other considerations DOE deems to be relevant.

(c) Solicitation. (1) To secure the economic benefit and security of a diversified base of potential suppliers of petroleum products to the SPR, DOE shall maintain a listing, developed through online registration, direct requests to DOE, and outreach to potential suppliers by DOE. Upon the issuance of a solicitation, DOE shall notify potential suppliers via their registered email addresses.

(2) DOE shall make the solicitation publicly available on the website of the OPR: www.spr.doe.gov.

(d) Timing and duration of solicitation. (1) DOE shall determine petroleum products requirements on nominal six-month cycles, and shall review and update these requirements prior to each solicitation cycle.

(2) Unless termination rights are explicitly waived by DOE, DOE may terminate any solicitations and contracts pertaining to the acquisition or exchange of petroleum products at the convenience of the Government, and in such event shall not be responsible for any costs incurred by suppliers, other than costs for petroleum products delivered to the SPR and for reasonable, customary, and applicable costs incurred by the supplier in the performance of a valid contract for delivery before the effective date of termination of such contract. In no event shall the Government be liable for consequential damages or the entity's lost profits as a result of such termination.

(e) Quality. (1) DOE shall define minimum petroleum product quality specifications for the SPR. DOE shall include such specifications in acquisition solicitations, and shall make them available on the website of the OPR: www.spr.doe.gov.

(2) DOE shall periodically review the quality specifications to ensure, to the greatest extent practicable, the petroleum product mix in storage matches the demand of the United States refining system.

(f) Quantity. In determining the quantities of petroleum products to be delivered to the SPR, DOE shall:

(1) Take into consideration market conditions and the availability of transportation systems; and

(2) Seek to avoid adversely affecting other market participants or petroleum product market fundamentals.

(g) Offer and evaluation procedures. (1) Each solicitation shall provide necessary instructions on offer format and submission procedures. The details of the offer, evaluation, and award procedures may vary depending on the method of acquisition.

(2) DOE shall use relative values and time differentials to manage acquisition and delivery schedules to reduce acquisition costs.

(3) DOE shall evaluate offers based on prevailing market prices of specific petroleum products, and shall award contracts on a competitive basis.

(4) Whether acquisition is by purchase or exchange, DOE shall use a price index to account for fluctuations in absolute and relative market prices at the time of delivery to reduce market risk to all parties throughout the contract term.

(h) Scheduling and delivery. (1) Except as provided in paragraph (h)(4) of this section, DOE shall accept offers for petroleum products delivered to specified SPR storage sites via pipeline or as waterborne cargos delivered to the terminals serving those sites.

(2) Except as provided in paragraph (h)(4) of this section, DOE shall generally establish schedules that allow for evenly spaced deliveries of economically sized marine and pipeline shipments within the constraints of SPR site and commercial facilities receipt capabilities.

(3) DOE shall strive to maximize U.S. flag carrier utilization through the terms of its supply contracts.

(4) DOE reserves the right to accept offers for other methods of delivery if, in DOE's sole judgment, market conditions and logistical constraints require such other methods.

[87 FR 64372, Oct. 25, 2022, as amended at 90 FR 20766, May 16, 2025]

§ 626.6 Acquiring petroleum products by purchase.

(a) General. For the purchase of petroleum products, DOE shall, through certified contracting officers, conduct petroleum product acquisitions in accordance with the FAR and the DEAR.

(b) Acquisition strategy. (1) DOE solicitations:

(i) May be either continuously open or fixed for a period of time; and

(ii) May provide either for immediate delivery or for delivery at future dates.

(2) DOE may alter the acquisition plan to take advantage of differentials in prices for different qualities of petroleum products, based on a consideration of factors, including the availability of storage capacity in the SPR sites, the logistics of changing delivery streams, and the availability of ships, pipelines, and terminals to move and receive the petroleum products.

(3) Based on the market analysis described in paragraph (d) of this section, DOE may refuse offers or suspend the acquisition process on the basis of Government estimates projecting substantially lower petroleum product prices in the future than those contained in offers. If DOE determines there is a high probability that the cost to the Government can be reduced without significantly affecting national energy security goals, DOE may either contract for delivery at a future date or delay purchases to take advantage of the projected lower future prices. Conversely, DOE may increase the rate of purchases if prices fall below recent price trends or futures markets present a significant contango and prices offer the opportunity to reduce the average cost of petroleum product acquisitions in anticipation of higher future prices.

(4) Based on the market analysis described in paragraph (d) of this section, DOE may refuse offers, decrease the rate of purchase, or suspend the acquisition process if DOE determines acquisition will add significant upward pressure to prices either regionally or on a world-wide basis. DOE may consider recent price changes, private inventory levels, petroleum product acquisition by other stockpiling entities, the outlook for world petroleum products production, incipient disruptions of supply or refining capability, logistical problems for moving petroleum products, macroeconomic factors, and any other considerations that may be pertinent to the balance of petroleum product supply and demand.

(c) Fill requirements determination. DOE shall develop SPR fill requirements for each solicitation based on an assessment of national energy security goals, the availability of storage capacity, and the need for specific grades and quantities of petroleum products.

(d) Market analysis. (1) DOE shall establish a market value for each petroleum product to be acquired based on a market analysis at the time of contract award.

(2) DOE may consider prices on futures markets, spot markets, recent price movements, current and projected shipping rates, forecasts by the DOE Energy Information Administration, and any other analytic tools available to DOE to determine the most desirable purchase profile.

(3) DOE may also consider factors including recent price changes, private inventory levels, petroleum product acquisition by other stockpiling entities, the outlook for world petroleum product production, disruptions of supply or refining capability, logistical problems for moving petroleum products, macroeconomic factors, and any other considerations that may be pertinent relevant to the balance of petroleum product supply and demand.

(e) Evaluation of offers. (1) DOE shall evaluate offers using:

(i) The criteria and requirements stated in the solicitation; and

(ii) The market analysis under paragraph (d) of this section.

(2) DOE shall require financial guarantees from the contracting entity, in the form of a letter of credit or equivalent financial assurance.

[87 FR 64372, Oct. 25, 2022, as amended at 90 FR 20766, May 16, 2025]

§ 626.7 Acquiring petroleum products by exchange.

(a) General. DOE may, through certified contracting officers, conduct petroleum product acquisitions through the exchange of petroleum products. Exchanges are conducted through emergency requests or by solicitation.

(b) Emergency requests. (1) Notwithstanding the requirements of § 626.5, the requirements of this subsection shall control all exchanges by emergency request.

(2) At any point, in the event of an emergency, a requestor may request, in writing, for an exchange of petroleum product from the SPR.

(3) All requests shall include the following:

(i) A justification of need that describes:

(A) The emergency event,

(B) The emergency event's impact on the requestor, and

(C) The requestor's inability to acquire petroleum product from an alternative source;

(ii) The quantity of petroleum product (in barrels) requested;

(iii) The quality specifications of petroleum product requested; and

(iv) The anticipated duration of the emergency event.

(4) Upon receipt of an emergency request, DOE will verify the emergency, evaluate the need, and assess the market to ensure there is no alternative source of petroleum products available to the requester. DOE, in its sole discretion, may approve or disapprove any emergency request.

(5) Upon approval of an emergency request, DOE may enter into contract negotiations with the requestor.

(6) Repayment to the SPR for an exchange by emergency request shall be in the form of barrels of petroleum products, or another form of repayment as permitted by law, and shall include the following to be returned to the SPR by the contracted date:

(i) The principal amount of petroleum products provided to the requestor;

(ii) A premium; and

(iii) Costs incurred by DOE in conducting the emergency request.

(c) Solicitation for exchange. (1) A solicitation for exchange:

(i) May be either continuously open or fixed for a period of time;

(ii) Shall advertise the quantity and quality specification of petroleum product available for exchange;

(iii) May provide either for immediate delivery or for delivery at future dates to a bidding entity;

(iv) May, in DOE's sole discretion, include a rate table from which offerors may offer dates for repayment; and

(v) May require financial guarantees from offerors in the form of a letter of credit or equivalent financial assurance to accompany their bids.

(2) In conducting the bidding and selection process:

(i) Offerors shall follow the instructions to offerors included in the solicitation;

(ii) DOE shall evaluate and select bids that best support national energy security goals, the availability of petroleum products and storage capacity, and need for specific grades and quantities of petroleum products; and

(iii) Upon selection of a successful bid, DOE shall notify the apparently successful offeror.

(3) Repayment to the SPR for an exchange by solicitation shall be in the form of barrels of petroleum products or another form of repayment as permitted by law, and may be calculated based on any rate table, if applicable, and shall include the following:

(i) Principal amount of petroleum product owed to SPR in the case of an exchange or a deferred contractually scheduled delivery;

(ii) Costs incurred by DOE in conducting the exchange; and

(iii) A premium for each prospective date for repayment.

(4) Based on the market analysis described in paragraph (c)(5) of this section, DOE may refuse offers, decrease the rate of acquisition, or suspend the exchange process if DOE determines acquisition will add significant upward pressure to prices either regionally or on a worldwide basis. DOE may consider recent price changes, private inventory levels, petroleum product acquisition by other stockpiling entities, the outlook for world petroleum products production, incipient disruptions of supply or refining capability, logistical problems for moving petroleum products, macroeconomic factors, and any other considerations that may be pertinent to the balance of petroleum product supply and demand.

(5) Market analysis:

(i) DOE shall establish a market value for each petroleum product to be acquired based on a market analysis at the time of contract award.

(ii) DOE may consider prices on futures markets, spot markets, recent price movements, current and projected shipping rates, forecasts by the DOE Energy Information Administration, and any other analytic tools available to DOE to determine the most desirable purchase profile.

(iii) DOE may also consider factors including recent price changes, private inventory levels, petroleum product acquisition by other stockpiling entities, the outlook for world petroleum product production, disruptions of supply or refining capability, logistical problems for moving petroleum products, macroeconomic factors, and any other considerations that may be pertinent relevant to the balance of petroleum product supply and demand.

§ 626.8 Deferrals of contractually scheduled deliveries.

(a) General. (1) DOE prefers to take deliveries of petroleum products for the SPR at times scheduled under applicable contracts. However, in the event the market is distorted by disruption to supply or other factors, DOE may defer scheduled deliveries or consider deferral requests from awardees.

(2) An awardee seeking to defer scheduled deliveries of petroleum products to the SPR may submit a deferral request to DOE.

(b) Deferral criteria. DOE shall only grant a deferral request for negotiation under paragraph (c) of this section if it determines that DOE can receive a premium for the deferral and, based on DOE's deferral analysis, that at least one of the following conditions exists:

(1) DOE can reduce the cost of its petroleum products acquisition per barrel and increase the volume of petroleum products being delivered to the SPR by means of the premium barrels required by the deferral process;

(2) DOE anticipates private inventories are approaching a point where unscheduled outages may occur;

(3) There is evidence that refineries are reducing their run rates for lack of feedstock; or

(4) There is an unanticipated disruption to petroleum product supply.

(c) Negotiating terms. (1) If DOE decides to negotiate a deferral of deliveries, DOE shall estimate the market value of the deferral and establish a strategy for negotiating with suppliers the minimum percentage of the market value to be taken by the Government. During these negotiations, if the deferral request was initiated by DOE, DOE may consider any reasonable, customary, and applicable costs already incurred by the supplier in the performance of a valid contract for delivery. In no event shall such consideration account for any consequential damages or lost profits suffered by the supplier as a result of such deferral.

(2) DOE shall only agree to amend the contract if the negotiation results in an agreement to give the Government a fair and reasonable share of the market value.

§ 626.9 Suspension and pre-drawdown diversion.

Where the Secretary has found that a severe energy supply interruption may be imminent, the Secretary may suspend any previously announced or contracted acquisition of any petroleum product by the SPR or injection of petroleum products into the SPR; or sell any petroleum product acquired for injection into the SPR that has not yet been injected into the SPR.

627-699 PARTS 627-699 [RESERVED]

CHAPTER III DEPARTMENT OF ENERGY

700-705 PARTS 700-705 [RESERVED]

PART 706 SECURITY POLICIES AND PRACTICES RELATING TO LABOR-MANAGEMENT RELATIONS

Authority: Sec. 161, 68 Stat. 948, as amended; 42 U.S.C. 2201.

Source: 41 FR 56776, Dec. 30, 1976, unless otherwise noted.

1 General

§ 706.1 Purpose.

The purpose of this part is to set forth Department of Energy, hereinafter “DOE,” security policies and practices in the area of labor-management relations.

§ 706.2 Basis and scope.

The specific policies contained in this part are worked out within the framework of DOE's general objectives for labor-management relations in the DOE program, namely:

(a) Wholehearted acceptance by contractors and by labor and its representatives of the moral responsibility inherent in participation in the DOE program;

(b) Development of procedures to assure (1) that all participants in the program are loyal to the United States including those whose participation involves the exercise of negotiating and disciplinary authority over bargaining units, and (2) that determination of unit, jurisdiction, and similar questions will not breach security;

(c) Continuity of production at vital DOE installations;

(d) Consistent with DOE's responsibility under the law, the least possible governmental interference with the efficient management expected from DOE contractors;

(e) Minimum interference with the traditional rights and privileges of American labor.

2 Security Policies and Procedures in National Labor Relations Board Proceedings

§ 706.10 Policy.

It is policy of DOE that NLRB cases falling within the scope of the Labor Management Relations Act at the various DOE installations should be conducted in normal fashion whereever possible, on the basis of open hearings, unclassified records and published decisions. This policy does not preclude adoption of special arrangements which may be required for reasons of program security at any stage of the proceedings in particular areas.

§ 706.11 Consent elections.

In accordance with the recommendation of the President's Commission on Labor Relations in the Atomic Energy Installations, it is the policy of DOE to encourage every effort by management and labor at DOE installations to determine bargaining units and representatives by agreement and consent elections in preference to contested proceedings before the National Labor Relations Board.

§ 706.12 Administrative Law Judges.

By agreement with the National Labor Relations Board, a panel of cleared NLRB administrative law judges is maintained to facilitate resolution of questions as to the materiality of classified information in NLRB hearings and to facilitate preparation of an unclassified record. The assignment of individual administrative law judges to DOE cases remains a matter within the discretion of the National Labor Relations Board.

§ 706.13 Clearance of counsel.

It is recognized that clearance of counsel for the parties is sometimes desirable for proper preparation of a case even though the record is to be unclassified. Clearance of counsel makes possible their participation in any closed discussions needed preparatory to making an unclassified record. Each party is responsible for requesting clearance of its counsel well in advance so that clearance requirements will not delay the proceeding. The clearance of temporary special counsel will be terminated on completion of the proceeding.

§ 706.14 DOE's role in proceedings.

If controversies within the scope of the Labor Management Relations Act arise which cannot be adjusted by mutual agreement, and contested proceedings before NLRB result, each party to such proceedings will present his own position and the evidence in support thereof with due regard for existing security rules. DOE will be continuously informed of the progress of such proceedings and will act as may appear desirable (a) to assure the protection of classified information; (b) to assure that material and relevant information is not withheld from the record on grounds of security if such information can be supplied in unclassified form; and (c) to assist in determining appropriate action where a decision may turn on data which can be expressed only in classified form.

3 Loyalty of Participants

§ 706.20 Policy.

Loyalty to the United States is a paramount factor applicable to all participants in DOE program including those whose participation (although not requiring access to restricted data) involves the exercise of administrative, negotiating and disciplinary authority over bargaining units composed of employees engaged on classified work. Individuals involved in questions of loyalty will be given full opportunity to explore the questions with DOE. DOE will take such further steps as may be appropriate in the circumstances.

4 Contract Negotiation and Administration

§ 706.30 Clearance of certain local union representatives.

It is recognized that security clearance of certain union representatives may be necessary to assure opportunity for effective representation of employees in collective bargaining relationships with DOE contractors. Accordingly, DOE managers may authorize investigation for “Q” clearance of union officials whose functions as representatives of employees may reasonably be expected to require access to Restricted Data under NLRB and other procedures according to applicable law (LMRA, 1947); to effectively perform their representation functions in the resolution of grievances and in other collective bargaining relationships with contractors; to effectuate the recommendation of the President's Commission on Labor Relations in the Atomic Energy Installations in respect to integration of the union into the plant organization “as to two-way channel of communication and a medium of understanding between management and workers”.

(a) In the pre-contract stage of union-management relations, the requirements of the Labor Management Relations Act normally will be the applicable criteria for determining which bargaining representatives, if any, will need access to classified material in the exercise of their functions as employee representatives.

(b) After a bargaining relationship has been established between the contractor and the representatives of its employees the nature of this relationship and the procedures followed in it normally will be the controlling criteria for determination of the access to be granted to particular persons in carrying out their functions as employee representatives. For example, many contract grievance procedures designate by title certain union and management officials who are to have definite roles in the resolution of grievances under the procedure. Investigation for “Q” clearance will normally be in order for such officials, both company and union, employee, and non-employee. In addition, persons not so designated may be investigated for clearance where the company and the union advise DOE manager that their established relationships contemplate access for such persons.

§ 706.31 Clearance of conciliators and arbitrators.

Conciliators and arbitrators who are regularly assigned to DOE cases may be processed for “Q” clearance at the discretion of the local DOE manager, either on the manager's initiative or at the request of a contractor.

§ 706.32 Security indoctrination of non-employee representatives.

All collective bargaining representatives, company and union, who are to have access to Restricted Data, will be given appropriate security indoctrination.

§ 706.40 Final responsibility of DOE in security matters.

On all matters of security at all Government-owned, privately operated DOE installations, DOE retains absolute and final authority, and neither the security rules nor their administration are matters for collective bargaining between management and labor, insofar as DOE security regulations affect the collective bargaining process, the security policies and regulations will be made known to both parties. To the fullest extent feasible DOE will consult with representatives of management and labor in formulating security rules and regulations that affect the collective bargaining process.

PART 707 WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES

Authority: 41 U.S.C. 8102 et seq.; 42 U.S.C. 2012, 2013, 2051, 2061, 2165, 2201b, 2201i, and 2201p; 42 U.S.C. 5814 and 5815; 42 U.S.C. 7151, 7251, 7254, and 7256; 50 U.S.C. 2401 et seq.

Source: 57 FR 32656, July 22, 1992, unless otherwise noted.

Subpart A General Provisions

§ 707.1 Purpose.

The Department of Energy (DOE) promulgates this part in order to protect the environment, maintain public health and safety, and safeguard the national security. This part establishes policies, criteria, and procedures for developing and implementing programs that help to maintain a workplace free from the use of illegal drugs. It applies to DOE contractors and subcontractors performing work at sites owned or controlled by DOE and operated under the authority of the Atomic Energy Act of 1954, as amended, and to individuals with unescorted access to the control areas of certain DOE reactors. The procedures include detection of the use of illegal drugs by current or prospective contractor employees in testing designated positions.

§ 707.2 Scope.

(a) This part applies to the following contracts with DOE, at sites owned or controlled by DOE which are operated under the authority of the Atomic Energy Act of 1954, as amended:

(1) Management and operating contracts; and

(2) Other contracts or subcontracts with a value of $25,000 or more, and which have been determined by DOE to involve:

(i) Access to or handling of classified information or special nuclear materials;

(ii) High risk of danger to life, the environment, public health and safety, or national security; or

(iii) Transportation of hazardous materials to or from a DOE site.

(b) Individuals described in § 707.7 (b) and (c) will be subject to random drug testing; to drug testing as a result of an occurrence, as described in § 707.9; and to drug testing on the basis of reasonable suspicion, as described in § 707.10.

(c) Applicants for employment in testing designated positions will be tested in accordance with § 707.8.

§ 707.3 Policy.

It is the policy of DOE to conduct its programs so as to protect the environment, maintain public health and safety, and safeguard the national security. This policy is advanced in this rule by requiring contractors and subcontractors within its scope to adopt procedures consistent with the baseline requirements of this part, and to impose significant sanctions on individuals in testing designated positions or with unescorted access to the control areas of certain DOE reactors, who use or are involved with illegal drugs.

§ 707.4 Definitions.

For the purposes of this part, the following definitions apply:

Collection Site Person means a technician or other person trained and qualified to take urine samples and to secure urine samples for later laboratory analysis.

Confirmed Positive Test means, for drugs, a finding based on a positive initial or screening test result, confirmed by another positive test on the same sample. The confirmatory test must be by the gas chromatography/mass spectrometry method.

Counseling means assistance provided by qualified professionals to employees, especially, but not limited to those employees whose job performance is, or might be, impaired as a result of illegal drug use or a medical-behavioral problem; such assistance may include short-term counseling and assessment, crisis intervention, referral to outside treatment facilities, and follow-up services to the individual after completion of treatment and return to work.

Drug Certification means a written assurance signed by an individual with known past illegal drug involvement, as a condition for obtaining or retaining a DOE access authorization, stating that the individual will refrain from using or being involved with illegal drugs while employed in a position requiring DOE access authorization (security clearance).

Employee Assistance means a program of counseling, referral, and educational services concerning illegal drug use and other medical, mental, emotional, or personal problems of employees, particularly those which adversely affect behavior and job performance.

Hazardous Material means any material subject to the placarding requirements of 49 CFR 172.504, table 1, and materials presenting a poison-inhalation hazard that must be placarded under the provisions of 49 CFR 172.505.

Head of DOE Field Element means an individual who is the manager or head of the DOE operations office or field office.

Illegal Drug means a controlled substance, as specified in Schedules I through V of the Controlled Substances Act, 21 U.S.C. 811, 812. The term “illegal drugs” does not apply to the use of a controlled substance in accordance with terms of a valid prescription, or other uses authorized by law.

Management and Operating Contract means an agreement for the operation, maintenance, or support, on behalf of the Government, of a Government-owned or controlled research, development, special production, or testing establishment wholly or principally devoted to one or more major programs of DOE.

Medical Review Officer (MRO) means a licensed physician, approved by DOE to perform certain functions under this part. The MRO is responsible for receiving laboratory results generated by an employer's drug testing program, has knowledge of illegal drug use and other substance abuse disorders, and has appropriate medical training to interpret and evaluate an individual's positive test result, together with that person's medical history and any other relevant biomedical information. For purposes of this part a physician from the site occupational medical department may be the MRO.

Occurrence means any event or incident that is a deviation from the planned or expected behavior or course of events in connection with any Department of Energy or Department of Energy-controlled operation, if the deviation has environmental, public health and safety, or national security protection significance. Incidents having such significance include the following, or incidents of a similar nature:

(1) Injury or fatality to any person involving actions of a Department of Energy contractor employee.

(2) Involvement of nuclear explosives under Department of Energy jurisdiction which results in an explosion, fire, the spread of radioactive material, personal injury or death, or significant damage to property.

(3) Accidental release of pollutants which results or could result in a significant effect on the public or environment.

(4) Accidental release of radioactive material above regulatory limits.

Random Testing means the unscheduled, unannounced urine drug testing of randomly selected individuals in testing designated positions, by a process designed to ensure that selections are made in a non-discriminatory manner.

Reasonable Suspicion means a suspicion based on an articulable belief that an employee uses illegal drugs, drawn from particularized facts and reasonable inferences from those facts, as detailed further in § 707.10.

Referral means the direction of an individual toward an employee assistance program or to an outside treatment facility by the employee assistance program professional, for assistance with prevention of illegal drug use, treatment, or rehabilitation from illegal drug use or other problems. Referrals to an employee assistance program can be made by the individual (self-referral), by contractor supervisors or managers, or by a bargaining unit representative.

Rehabilitation means a formal treatment process aimed at the resolution of behavioral-medical problems, including illegal drug use, and resulting in such resolution.

Special Nuclear Material has the same meaning as in section 11aa of the Atomic Energy Act of 1954 (42 U.S.C. 2014(aa)).

Specimen Chain of Custody Form is a form used to document the security of the specimen from time of collection until receipt by the laboratory. This form, at a minimum, shall include specimen identifying information, date and location of collection, name and signature of collector, name of testing laboratory, and the names and signatures of all individuals who had custody of the specimen from time of collection until the specimen was prepared for shipment to the laboratory.

Testing Designated Position names a position whose incumbents are subject to drug testing under this part.

[57 FR 32656, July 22, 1992, as amended at 80 FR 5008, Jan. 30, 2015]

Subpart B Procedures

§ 707.5 Submission, approval, and implementation of a baseline workplace substance abuse program.

(a) Each contractor subject to this part shall develop a written program consistent with the requirements of this part and the guidelines of the Department of Health and Human Services and subsequent amendments to those guidelines (“Mandatory Guidelines for Federal Workplace Drug Testing Programs,” 53 FR 11970, April 11, 1988; hereinafter “HHS Mandatory Guidelines”), and applicable to appropriate DOE sites. Such a program shall be submitted to DOE for review and approval, and shall include at least the following baseline elements:

(1) Prohibition of the use; possession, sale, distribution, or manufacture of illegal drugs at sites owned or controlled by DOE;

(2) Plans for instruction of supervisors and employees concerning problems of substance abuse, including illegal drug use, and the availability of assistance through the employee assistance program and referrals to other resources, and the penalties that may be imposed upon employees for drug-related violations occurring on the DOE owned or controlled site;

(3) Provision for distribution to all employees engaged in performance of the contract on the DOE owned or controlled site of a statement which sets forth the contractor's policies prohibiting the possession, sale, distribution, or manufacture of illegal drugs at the DOE owned or controlled site. The statement shall include notification to all employees that as a condition of employment under the contract, the employee will:

(i) Abide by the terms of the statement; and

(ii) Notify the employer in writing of the employee's conviction under a criminal drug statute for a violation occurring on the DOE owned or controlled site no later than 10 calendar days after such conviction;

(4) Provision for written notification to the DOE contracting officer within 10 calendar days after receiving notice under paragraph (a)(3)(ii) of this section, from an employee or otherwise receiving actual notice of an employee's conviction of a drug-related offense;

(5) Provision for imposing one of the following actions, with respect to any employee who is convicted of a drug-related violation occurring in the workplace, within 30 calendar days after receiving such notice of conviction under paragraph (a)(4) of this section;

(i) Taking appropriate personnel action against such employee, up to and including termination; or

(ii) Offering such employee, consistent with the contractor's policies, an opportunity to participate satisfactorily in a drug abuse assistance or rehabilitation program approved for such purposes by a Federal, State, or local health, law enforcement, or other appropriate agency. If the employee does not participate in such a rehabilitation program, the contractor must take appropriate personnel action, up to and including termination, in accordance with the contractor's policies.

(6) Commitment to make a good faith effort to maintain a workplace free of substance abuse through implementation of paragraphs (a)(1) through (a)(5) of this section.

(b) In addition, the following baseline elements must be included in programs developed by contractors that have identified testing designated positions (see § 707.7(b));

(1) Notification to DOE of the positions subject to drug testing;

(2) Prohibition of individuals in testing designated positions who are not free from the use of illegal drugs from working in those positions;

(3) Sanctions for individuals in testing designated positions who violate the prohibitions of paragraphs (a)(1) or (b)(2) of this section;

(4) Provision for:

(i) Notification, at least 60 days in advance of initiating testing, to those individuals subject to drug testing, unless the contractor is currently conducting a testing program.

(ii) Urine drug analysis of applicants for testing designated positions before final selection for employment or assignment;

(iii) Random urine drug analysis for employees in testing designated positions;

(iv) Urine drug analysis for employees in testing designated positions on the basis of reasonable suspicion, as a result of an occurrence, or as a follow-up to rehabilitation; and

(v) Random urine drug analysis and urine drug analysis on the basis of reasonable suspicion or as the result of an occurrence, for any individual with unescorted access to the control areas of certain DOE reactors (see § 707.7(c)).

(vi) Written notice to the contractor by an employee in a testing designated position of a drug-related arrest or conviction, or receipt of a positive drug test result regarding that employee, as soon as possible but within 10 calendar days of such arrest, conviction, or receipt; and

(vii) Appropriate action, if any, to be taken regarding an employee who:

(A) is arrested for or convicted of a drug-related offense; or

(B) has a positive drug test result (consistent with § 707.14).

(5) Provision to employees of the opportunity for rehabilitation, consistent with the contractor's policies, under circumstances as provided in this part (see § 707.14(b));

(6) Immediate notification to DOE security officials whenever the circumstances in connection with procedures under this part raise a security concern as provided in DOE Orders, rules and regulations; such circumstances including, but are not necessarily limited to, a determination that an individual holding a DOE access authorization has used an illegal drug.

(c) Each contractor's written policy and procedures under this part shall comply with the requirements of 10 CFR part 710, “Criteria and Procedures for Determining Eligibility for Access to Classified Matter or Significant Quantities of Special Nuclear Material.”

(d) Contractors are required to submit all subcontracts they believe to be within the scope of this part to the Head of DOE Field Element for a determination as to whether the subcontract falls within the scope of this part. Subcontractors so determined to be within the scope of this part shall be required to agree to comply with its requirements, as a condition of eligibility for performing the subcontract work. Each subcontractor subject to this part shall submit its plan to the appropriate prime contractor for approval; the contractor shall be responsible for periodically monitoring the implementation of the subcontractor's program for effectiveness and compliance with this part.

(e) In reviewing each proposed workplace substance abuse plan, the Head of DOE Field Element shall decide whether the program meets the applicable baseline requirements established by this part. The responsible Head of DOE Field Element will reject proposed workplace substance abuse plans that are deemed not to meet the baseline requirements. The Head of DOE Field Element shall provide the contractor with a written notification regarding the decision as to the acceptability of the plan. Nothing in this rule is intended to prohibit any contractor subject to this part from implementing workplace substance abuse requirements additional to those of the baseline, including drug testing employees and applicants for employment in any position and testing for any illegal drugs. However, the contractor shall inform Head of DOE Field Element of such additional requirements at least 30 days prior to implementation.

(f) DOE shall periodically review and evaluate each contractor's program, including the contractor's oversight of the covered subcontractors, to assure effectiveness and compliance with this part.

(g) Contractors or proposers will submit their program to the appropriate Head of DOE Field Element for review within 30 days of notification by the appropriate Head of DOE Field Element that the contract or proposed contract falls within the scope of this part. Workplace substance abuse programs, as provided in this part, shall be implemented within 30 days of approval by the Head of DOE Field Element. The Head of DOE Field Element may grant an extension to the notification or implementation period, as warranted by local conditions. Implementation may require changes to collective bargaining agreements as discussed in § 707.15 of this part.

(h) To assure consistency of application, The Head of DOE Field Element shall periodically review designated contracts and testing designated positions included in the workplace substance abuse plans approved by The Head of DOE Field Element. The Head of DOE Field Element will also periodically review implementation of programs conducted by prime contractors, to assure consistency of application among prime contracts (and subcontracts where appropriate).

(i) This part preempts any State or local law, rule, regulation, order, or standard to the extent that:

(1) compliance with both the State or local requirement and any requirements in this part is not possible; or

(2) compliance with the State or local requirement is an obstacle to the accomplishments and execution of any requirement in this part.

[57 FR 32656, July 22, 1992,, as amended at 80 FR 5008, Jan. 30, 2015]

§ 707.6 Employee assistance, education, and training.

Contractor programs shall include the following or appropriate alternatives:

(a) Employee assistance programs emphasizing preventive services, education, short-term counseling, coordination and referral to outside agencies, and follow-up. These services shall be available to all contractor on-site employees involved in the DOE contract. The contractor has no obligation to pay the costs of any individual's counseling, treatment, or rehabilitation beyond those services provided by the contractor's employee assistance program, except as provided for in the contractor's benefits programs. DOE undertakes no obligation to pay for any individual's counseling, rehabilitation, or treatment, unless specifically provided for by contract.

(b) Education and training programs for on-site employees on a periodic basis, which will include, at a minimum, the following subjects:

(1) For all on-site employees: Health aspects of substance abuse, especially illegal drug use; safety, security, and other workplace-related problems caused by substance abuse, especially illegal drug use; the provisions of this rule; the employer's policy; and available employee assistance services.

(2) For managers and supervisors:

(i) The subjects listed in paragraph (b)(1) of this section;

(ii) Recognition of deteriorating job performance or judgment, or observation of unusual conduct which may be the result of possible illegal drug use;

(iii) Responsibility to intervene when there is deterioration in performance, or observed unusual conduct, and to offer alternative courses of action that can assist the employee in returning to satisfactory performance, judgment, or conduct, including seeking help from the employee assistance program;

(iv) Appropriate handling and referral of employees with possible substance abuse problems, especially illegal drug use; and

(v) Employer policies and practices for giving maximum consideration to the privacy interests of employees and applicants.

§ 707.7 Random drug testing requirements and identification of testing designated positions.

(a)(1) Each workplace substance abuse program will provide for random testing for evidence of the use of illegal drugs of employees in testing designated positions identified in this section.

(2) Programs developed under this part for positions identified in paragraphs (b)(2) and (3) of this section shall provide for random tests at a rate equal to 30 percent of the total number of employees in testing designated positions for each 12-month period. Employees in the positions identified in paragraph (b)(1) of this section and individuals identified in paragraph (c) of this section will be subject to random testing at a rate equal to 100 percent of the total number of employees or individuals, as applicable, identified, and those identified in paragraphs (b)(1) and (c) may be subject to additional drug tests.

(b) The testing designated positions subject to random drug testing are:

(1) Positions determined to be covered by the Human Reliability Program (HRP), codified at 10 CFR part 712. HRP employees will be subject to the drug testing standards of this part and any additional requirements of the HRP rule.

(2) Positions identified by the contractor which entail duties where failure of an employee adequately to discharge his or her position could significantly harm the environment, public health or safety, or national security, such as:

(i) Pilots;

(ii) Firefighters;

(iii) Protective force personnel, exclusive of those covered in paragraph (b)(1) and (c) of this section, in positions involving use of firearms where the duties also require potential contact with, or proximity to, the public at large;

(iv) Personnel directly engaged in construction, maintenance, or operation of nuclear reactors;

(v) Personnel directly engaged in production, use, storage, transportation, or disposal of hazardous materials sufficient to cause significant harm to the environment or public health and safety; or

(vi) All other personnel in positions that require an access authorization (security clearance), other than those identified in paragraphs (b)(1) and (c) of this section.

(3) Other positions determined by the DOE, after consultation with the contractor, to have the potential to significantly affect the environment, public health and safety, or national security.

(c) Each contractor shall require random testing of any individual, whether or not an employee, who is allowed unescorted access to the control areas of the following DOE reactors: Advanced Test Reactor (ATR) and High Flux Isotope Reactor (HFIR). A confirmed positive test shall result in such an individual being denied unescorted access. If such an individual is not an employee of the contractor, that individual may be granted unescorted access only after the individual meets the conditions established in § 707.14(d) of this part. If, after restoration of unescorted access, such an individual is determined to have used illegal drugs for a second time, unescorted access shall be denied for a period of not less than three (3) years. Such an individual thereafter shall be granted unescorted access only upon a determination by the Head of DOE Field Element that a grant of unescorted access to the individual presents no unacceptable safety or security risk. If such an individual is an employee, that individual is subject to the other requirements of this part, including appropriate disciplinary measures.

(d) A position otherwise subject to testing under this part may be exempted from such testing if it is within the scope of another comparable Federal drug testing program, as determined by DOE, after consultation with the contractor, to avoid unnecessary multiple tests.

[57 FR 32656, July 22, 1992, as amended at 73 FR 3863, Jan. 23, 2008; 80 FR 5008, Jan. 30, 2015; 87 FR 49978, Aug. 15, 2022]

§ 707.8 Applicant drug testing.

An applicant for a testing designated position will be tested for the use of illegal drugs before final selection for employment or assignment to such a position. Provisions of this part do not prohibit contractors from conducting drug testing on applicants for employment in any position.

§ 707.9 Drug testing as a result of an occurrence.

When there is an occurrence which is required to be reported to DOE by the contractor, under contract provisions incorporating applicable DOE Orders, rules, and regulations, it may be necessary to test individuals in testing designated positions, or individuals with unescorted access to the control areas of the DOE reactors listed in § 707.7(c), for the use of illegal drugs, if such individuals could have caused or contributed to the conditions which caused the occurrence. For an occurrence requiring immediate notification or reporting as required by applicable DOE Orders, rules, and regulations, the contractor will require testing as soon as possible after the occurrence but within 24 hours of the occurrence, unless DOE determines that it is not feasible to do so. For other occurrences requiring notifications to DOE as required by applicable DOE Orders, rules, and regulations, the contractor may require testing.

§ 707.10 Drug testing for reasonable suspicion of illegal drug use.

(a)(1) It may be necessary to test any employee in a testing designated position, or individuals with unescorted access to the control areas of the DOE reactors listed in § 707.7(c), for the use of illegal drugs, if the behavior of such an individual creates the basis for reasonable suspicion of the use of illegal drugs. Two or more supervisory or management officials, at least one of whom is in the direct chain of supervision of the employee, or is a physician from the site occupational medical department, must agree that such testing is appropriate. Reasonable suspicion must be based on an articulable belief that an employee uses illegal drugs, drawn from particularized facts and reasonable inferences from those facts.

(2) Such a belief may be based upon, among other things:

(i) Observable phenomena, such as direct observation of:

(A) The use or possession of illegal drugs; or

(B) The physical symptoms of being under the influence of drugs;

(ii) A pattern of abnormal conduct or erratic behavior;

(iii) Arrest for a conviction of a drug related offense, or the identification of the individual as the focus of a criminal investigation into illegal drug possession use, or trafficking;

(iv) Information that is either provided by a reliable and credible source or is independently corroborated;

(v) Evidence that an employee has tampered with a drug test; or

(vi) Temperature of the urine specimen is outside the range of 32-38 degrees centigrade or 90-100 degrees Fahrenheit.

(b) The fact that an employee had a confirmed positive test for the use for the use of illegal drugs at some prior time, or has undergone a period of rehabilitation or treatment, will not, in and of itself, be grounds for testing on the basis of reasonable suspicion.

(c) The requirements of this part relating to the testing for the use of illegal drugs are not intended to prohibit the contractor from pursuing other existing disciplinary procedures or from requiring medical evaluation of any employee exhibiting aberrant or unusual behavior.

[57 FR 32656, July 22, 1992, as amended at 80 FR 5008, Jan. 30, 2015]

§ 707.11 Drugs for which testing is performed.

Where testing is performed under this part, at a minimum, contractors will be required to test for the use of the following drugs or classes of drugs: marijuana; cocaine; opiates; phencyclidine; and amphetamines. However, when conducting reasonable suspicion or occurrence testing, the contractor may test for any drug listed in Schedules I or II of the Controlled Substances Act.

§ 707.12 Specimen collection, handling and laboratory analysis for drug testing.

(a) Procedures for providing urine specimens must allow individual privacy, unless there is reason to believe that a particular individual may alter or substitute the specimen to be provided. Contractors shall utilize a chain of custody procedure for maintaining control and accountability from point of collection to final disposition of specimens, and testing laboratories shall use appropriate cutoff levels in screening specimens to determine whether they are negative or positive for a specific drug, consistent with the HHS Mandatory Guidelines (see § 707.5(a)). The contractor shall ensure that only testing laboratories certified by the Department of Health and Human Services, are utilized.

(b)(1) If the individual refuses to cooperate with the urine collection (e.g., refusal to provide a specimen, or to complete paperwork), then the collection site person shall inform the MRO and shall document the non-cooperation on the specimen chain of custody form. The MRO shall report the failure to cooperate to the appropriate management authority, who shall report to DOE if the individual holds an access authorization. Individuals so failing to cooperate shall be treated in all respects as if they had been tested and had been determined to have used an illegal drug. The contractor may apply additional sanctions consistent with its disciplinary policy.

(2) The collection site person shall ascertain that there is a sufficient amount of urine to conduct an initial test, a confirmatory test, and a retest, in accordance with the HHS Mandatory Guidelines. If there is not a sufficient amount of urine, additional urine will be collected in a separate container. The individual may be given reasonable amounts of liquid and a reasonable amount of time in which to provide the specimen required. The individual and the collection site person must keep the specimen in view at all times. In the event that the individual fails to provide a sufficient amount of urine, the amount collected will be noted on the “Urine Sample Custody Document.” In this case, the collection site person will telephone the individual's supervisor who will determine the next appropriate action. This may include deciding to reschedule the individual for testing, to return the individual to his or her work site and initiate disciplinary action, or both.

[57 FR 32656, July 22, 1992, as amended at 73 FR 3863, Jan. 23, 2008; 80 FR 5008, Jan. 30, 2015]

§ 707.13 Medical review of results of tests for illegal drug use.

(a) All test results shall be submitted for medical review by the MRO. A confirmed positive test for drugs shall consist of an initial test performed by the immunoassay method, with positive results on that initial test confirmed by another test, performed by the gas chromatography/mass spectrometry method (GC/MS). This procedure is described in the HHS Mandatory Guidelines.

(b) The Medical Review Officer will consider the medical history of the employee or applicant, as well as any other relevant biomedical information. When there is a confirmed positive test result, the employee or applicant will be given an opportunity to report to the MRO the use of any prescription or over-the-counter medication. If the MRO determines that there is a legitimate medical explanation for a confirmed positive test result, consistent with legal and non-abusive drug use, the MRO will certify that the test results do not meet the conditions for a determination of use of illegal drugs. If no such certification can be made, the MRO will make a determination of use of illegal drugs. Determinations of use of illegal drugs will be made in accordance with the criteria provided in the Medical Review Officer Manual issued by the Department of Health and Human Services.

[57 FR 32656, July 22, 1992, as amended at 80 FR 5008, Jan. 30, 2015]

§ 707.14 Action pursuant to a determination of illegal drug use.

(a) When an applicant for employment has been tested and determined to have used an illegal drug, processing for employment will be terminated and the applicant will be so notified.

(b)(1) When an employee who is in a testing designated position has been tested and determined to have used an illegal drug, the contractor shall immediately remove that employee from the testing designated position; if such employee also holds, or is an applicant for, an access authorization, then the contractor shall immediately notify DOE security officials for appropriate adjudication. If this is the first determination of use of illegal drugs by that employee (for example, the employee has not previously signed a DOE drug certification, and has not previously tested positive for use of illegal drugs), the employee may be offered a reasonable opportunity for rehabilitation, consistent with the contractor's policies. If rehabilitation is offered, the employee will be placed in a non-testing designated position, which does not require a security clearance, provided there is such an acceptable position in which the individual can be placed during rehabilitation; if there is no acceptable non-testing designated position, the employee will be placed on sick, annual, or other leave status, for a reasonable period sufficient to permit rehabilitation. However, the employee will not be protected from disciplinary action which may result from violations of work rules other than a positive test result for illegal drugs.

(2) Following a determination by the site occupational medical department, after counseling or rehabilitation, that the employee can safely return to duty, the contractor may offer the employee reinstatement, in the same or a comparable position to the one held prior to the removal, consistent with the contractor's policies and the requirements of 10 CFR part 710. Failure to take the opportunity for rehabilitation, if it has been made available, for the use of illegal drugs, will require significant disciplinary action up to and including removal from employment under the DOE contract, in accordance with the contractor's policies. Any employee who is twice determined to have used illegal drugs shall in all cases be removed from employment under the DOE contract. Also, if an employee who has signed a DOE drug certification violates the terms of the certification, DOE shall conduct a timely review of the circumstances of such violation, and the individual's continued eligibility for a DOE access authorization shall be determined under the provisions of 10 CFR part 710, “Criteria and Procedures for Determining Eligibility for Access to Classified Matter or Significant Quantities of Special Nuclear Material.”

(c) An employee who has been removed from a testing designated position because of the use of illegal drugs may not be returned to such position until that employee has:

(1) Successfully completed counseling or a program of rehabilitation;

(2) Undergone a urine drug test with a negative result; and

(3) Been evaluated by the site occupational medical department, which has determined that the individual is capable of safely returning to duty.

(d) An individual who is not an employee of a contractor who has been denied unescorted access because of the use of illegal drugs may not have the unescorted access reinstated until that individual has:

(1) Provided evidence of successful completion of counseling or a program of rehabilitation;

(2) Undergone a urine drug test with a negative result; and

(3) Been evaluated by the site occupational medical department, which has determined that the individual is capable of being permitted unescorted access to a reactor control area.

(e) If a DOE access authorization is involved, DOE must be notified of a contractor's intent to return to a testing designated position an employee removed from such duty for use of illegal drugs. Positions identified in § 707.7(b)(1) of this part will require DOE approval prior to return to a testing designated position.

(f) An individual who has been notified of a positive test result may request a retest of the same sample at the same or another certified laboratory. The individual shall bear the costs of transportation and/or testing of the specimen. The contractor will inform employees of their right to request a retest under the provisions of this paragraph.

(g) After an employee determined to have used illegal drugs has been returned to duty, the employee shall be subject to unannounced drug testing, at intervals, for a period of 12 months.

[57 FR 32656, July 22, 1992,, as amended at 80 FR 5008, Jan. 30, 2015; 87 FR 49979, Aug. 15, 2022]

§ 707.15 Collective bargaining.

When establishing drug testing programs, contractors who are parties to collective bargaining agreements will negotiate with employee representatives, as appropriate, under labor relations laws or negotiated agreements. Such negotiation, however, cannot change or alter the requirements of this rule because DOE security requirements themselves are non-negotiable under the security provisions of DOE contracts. Employees covered under collective bargaining agreements will not be subject to the provisions of this rule until those agreements have been modified, as necessary; provided, however, that if one year after commencement of negotiation the parties have failed to reach agreement, an impasse will be determined to have been reached and the contractor will unilaterally implement the requirements of this rule.

§ 707.16 Records.

(a) Confirmed positive test results shall be provided to the Medical Review Officer and other contractor and DOE officials with a need to know. Any other disclosure may be made only with the written consent of the individual.

(b) Contractors shall maintain maximum confidentiality of records related to illegal drug use, to the extent required by applicable statutes and regulations (including, but not limited to, 42 U.S.C. 290dd-3, 42 U.S.C. 290ee-3, and 42 CFR part 2). If such records are sought from the contractor for criminal investigations, or to resolve a question or concern relating to the Personnel Assurance Program certification or access authorization under 10 CFR part 710, any applicable procedures in statute or regulation for disclosure of such information shall be followed. Moreover, owing to DOE's express environmental, public health and safety, and national security interests, and the need to exercise proper contractor oversight, DOE must be kept fully apprised of all aspects of the contractor's program, including such information as incidents involving reasonable suspicion, occurrences, and confirmed test results, as well as information concerning test results in the aggregate.

(c) Unless otherwise approved by DOE, the contractors shall ensure that all laboratory records relating to positive drug test results, including initial test records and chromatographic tracings, shall be retained by the laboratory in such a manner as to allow retrieval of all information pertaining to the individual urine specimens for a minimum period of five years after completion of testing of any given specimen, or longer if so instructed by DOE or by the contractor. In addition, a frozen sample of all positive urine specimens shall be retained by the laboratory for at least six months, or longer if so instructed by DOE.

(d) The contractor shall maintain as part of its medical records copies of specimen chain of custody forms.

(e) The specimen chain of custody form will contain the following information:

(1) Date of collection;

(2) Tested person's name;

(3) Tested employee/applicant's social security number or other identification number unique to the individual;

(4) Specimen number;

(5) Type of test (random, applicant, occurrence, reasonable suspicion, follow-up, or other);

(6) Temperature range of specimen;

(7) Remarks regarding unusual behavior or conditions;

(8) Collector's signature; and

(9) Certification signature of specimen provider certifying that specimen identified is in fact the specimen the individual provided.

§ 707.17 Permissible actions in the event of contractor noncompliance.

Actions available to DOE in the event of contractor noncompliance with the provisions of this part or otherwise performing in a manner inconsistent with its approved program include, but are not limited to, suspension or debarment, contract termination, or reduction in fee in accordance with the contract terms.

PART 708 DOE CONTRACTOR EMPLOYEE PROTECTION PROGRAM

Authority: 42 U.S.C. 2201(b), 2201(c), 2201(i), and 2201(p); 42 U.S.C. 5814 and 5815; 42 U.S.C. 7251, 7254, 7255, and 7256; and 5 U.S.C. Appendix 3.

Source: 84 FR 37757, Aug. 2, 2019, unless otherwise noted.

Subpart A General Provisions

§ 708.1 Scope and purpose.

This part provides procedures for processing complaints by employees of DOE contractors alleging retaliation by their employers for disclosure of information concerning danger to public or worker health or safety, substantial violations of law, or gross mismanagement; for participation in Congressional proceedings; or for refusal to participate in dangerous activities.

§ 708.2 Definitions.

(a) For purposes of this part:

Administrative Judge means an attorney appointed by the OHA Director to preside over the disposition of a complaint.

Alternative Dispute Resolution means any technique for resolving disputes and managing conflict without resorting to litigation in either an administrative or judicial forum. Alternative Dispute Resolution techniques include, but are not limited to, mediation, facilitation, shuttle diplomacy, partnering, and dispute systems design.

Complainant means an employee who has filed a complaint under 10 CFR part 708.

Contractor means a seller of goods or services who is a party to a management and operating contract or other type of contract with DOE, or subcontract to such a contract, to perform work directly related to activities at DOE-owned or -leased facilities.

Day means a calendar day.

Discovery means a process used to enable the parties to learn about each other's evidence before a hearing takes place, including oral depositions, written interrogatories, requests for admissions, inspection of property, and requests for production of documents.

DOE Official means any officer or employee of DOE whose duties include program management or the investigation or enforcement of any law, rule, or regulation relating to Government contractors or the subject matter of a contract.

EC Director means the Director of the Office of Employee Concerns at DOE Headquarters, or any official to whom the Director delegates his functions under this part.

Employee means a person employed by a contractor, and any person previously employed by a contractor if that person's complaint alleges that employment was terminated for conduct described in § 708.5 of this subpart.

Field element means a DOE operations office or field office that is responsible for the management, coordination, and administration of operations at a DOE facility.

Head of Field Element means the manager or head of a DOE operations office or field office, or any official to whom those individuals delegate their functions under this part.

Management and operating contract means an agreement under which DOE contracts for the operation, maintenance, or support of a Government-owned or -leased research, development, special production, or testing establishment that is wholly or principally devoted to one or more of the programs of DOE.

OHA Director means the Director of the Office of Hearings and Appeals, or any official to whom the Director delegates his functions under this part.

Party means an employee, contractor, or other party named in a proceeding under this part.

Retaliation means an action (including intimidation, threats, restraint, coercion, or similar action) taken by a contractor against an employee with respect to employment (e.g., discharge, demotion, or other negative action with respect to the employee's compensation, terms, conditions, or privileges of employment) that would not have been taken but for the employee's disclosure of information, participation in proceedings, or refusal to participate in activities described in § 708.5 of this subpart.

(b) Throughout this part, the use of a word or term in the singular includes the plural, and the use of the male gender is gender neutral.

§ 708.3 Complaints covered.

This part applies to a complaint of retaliation filed by an employee of a contractor that performs work on behalf of DOE, directly related to activities at a DOE-owned or -leased site, if the complaint stems from a disclosure, participation, or refusal described in § 708.5 of this subpart.

§ 708.4 Complaints not covered.

An employee of a contractor may not file a complaint against his employer under this part if:

(a) The complaint is based on race, color, religion, sex, age, national origin, or other similar basis; or

(b) The complaint involves misconduct that the employee, acting without direction from the employer, deliberately caused, or in which the employee knowingly participated; or

(c) Except as provided in § 708.15(a), the complaint is based on the same facts for which the employee has chosen to pursue a remedy available under:

(1) Department of Labor regulations at 29 CFR part 24, “Procedures for the Handling of Discrimination Complaints under Federal Employee Protection Statutes;”

(2) Federal Acquisition Regulations, 48 CFR part 3, “Federal Acquisition Regulation; Whistleblower Protection for Contractor Employees (Ethics);” or

(3) State or other applicable law, including final and binding grievance-arbitration, as described in § 708.16 of subpart B; or

(d) The complaint is based on the same facts in which the employee, in the course of a covered disclosure or participation, improperly disclosed Restricted Data, national security information, or any other classified or sensitive information in violation of any Executive Order, statute, or regulation. This part does not override any provision or requirement of any regulation pertaining to Restricted Data, national security information, or any other classified or sensitive information; or

(e) The complaint deals with “terms and conditions of employment” within the meaning of the National Labor Relations Act, except as provided in § 708.5.

§ 708.5 Protected conduct.

An employee of a contractor may file a complaint against his employer alleging that he has been subject to retaliation for:

(a) Disclosing to a DOE official, a member of Congress, any other government official who has responsibility for the oversight of the conduct of operations at a DOE site, the employer, or any higher tier contractor, information that he reasonably believes reveals—

(1) A substantial violation of a law, rule, or regulation;

(2) A substantial and specific danger to employees or to public health or safety; or

(3) Fraud, gross mismanagement, gross waste of funds, or abuse of authority; or

(b) Participating in a Congressional proceeding or an administrative proceeding conducted under this part; or

(c) Subject to § 708.7 of this subpart, refusing to participate in an activity, policy, or practice if the employee believed participation would—

(1) Constitute a violation of a Federal health or safety law; or

(2) Cause the employee to have a reasonable fear of serious injury to himself, other employees, or members of the public.

§ 708.6 Reasonable fear of serious injury.

Participation in an activity, policy, or practice may cause an employee to have a reasonable fear of serious injury that justifies a refusal to participate if:

(a) A reasonable person, under the circumstances that confronted the employee, would conclude there is a substantial risk of a serious accident, injury, or impairment of health or safety resulting from participation in the activity, policy, or practice; or

(b) An employee, because of the nature of his employment responsibilities, does not have the training or skills needed to participate safely in the activity or practice.

§ 708.7 Filing a complaint based on retaliation for refusal to participate.

An employee may file a complaint for retaliation for refusing to participate in an activity, policy, or practice only if:

(a) Before refusing to participate in the activity, policy, or practice, the employee asked the employer to correct the violation or remove the danger, and the employer refused to take such action; and

(b) By the 30th day after the refusal to participate, the employee reported the violation or dangerous activity, policy, or practice to a DOE official, a member of Congress, another government official with responsibility for the oversight of the conduct of operations at the DOE site, his employer, or any higher tier contractor, and stated his reasons for refusing to participate.

§ 708.8 Application to pending cases.

The procedures in this part apply in any complaint proceeding filed with the Head of Field Element or EC Director, as appropriate, on or after the effective date of this part.

§ 708.9 How to file complaints or other documents.

(a) Under this part, a complaint or other document is considered filed on the date it is mailed, electronically submitted, or personally delivered to the specified official or office.

(b) A complaint may be withdrawn at any time at the request of the complainant.

(c) Absent exceptional circumstances, all submissions to the Office of Hearings and Appeals must be filed electronically in accordance with the instructions set forth on the Office of Hearings and Appeals website, found at https://www.energy.gov/oha/filing-information. The Office of Hearings and Appeals may grant permission to file via mail or facsimile.

§ 708.10 [Reserved]

Subpart B Employee Complaint Resolution Process

§ 708.11 Filing a complaint.

(a) If an employee was employed by a contractor whose contract is overseen by a contracting officer located in DOE Headquarters when the alleged retaliation occurred, the employee must file the written complaint with the EC Director.

(b) If an employee was employed by a contractor at a DOE field facility or site when the alleged retaliation occurred, the employee must file the written complaint with the Head of Field Element at the DOE field element with jurisdiction over the contract.

§ 708.12 No expectation of confidentiality.

The identity of an employee who files a complaint under this part appears on the complaint. A copy of the complaint is provided to the employer and the complainant's identity cannot be maintained as confidential.

§ 708.13 Requirements for the form and content of a complaint.

A complaint does not need to be in any specific form but must be signed by the employee and contain the following:

(a) A statement specifically describing

(1) The alleged retaliation taken against the employee and

(2) The disclosure, participation, or refusal covered under § 708.5 that the employee believes gave rise to the retaliation;

(b) A statement that the complainant is not currently pursuing a remedy under State or other applicable law, as described in § 708.16 of this subpart;

(c) A statement that all of the facts that the complainant has included in his complaint are true and correct to the best of his knowledge and belief; and

(d) An affirmation, as described in § 708.14 of this subpart, that the complainant has exhausted all applicable grievance or arbitration procedures.

§ 708.14 Exhaustion of grievance-arbitration procedures.

(a) To show that all applicable grievance-arbitration procedures have been exhausted, the complainant must:

(1) State that all available opportunities for resolution through an applicable grievance-arbitration procedure have been exhausted, and provide the date on which the grievance-arbitration procedure was terminated and the reasons for termination; or

(2) State that the complainant filed a grievance under applicable grievance-arbitration procedures, but more than 150 days have passed and a final decision on it has not been issued, and provide the date that the grievance was filed; or

(3) State that the employer has established no grievance-arbitration procedures.

(b) If the complainant does not provide the information specified in paragraph (a) of this section, the complaint may be dismissed for lack of jurisdiction as provided in § 708.18 of this subpart.

§ 708.15 Time to file a complaint.

(a) A complaint must be filed by the 90th day after the date the employee knew, or reasonably should have known, of the alleged retaliation.

(b) The period for filing a complaint does not include time spent attempting to resolve the dispute through an internal company grievance-arbitration procedure. The time period for filing stops running on the day the internal grievance is filed and begins to run again on the earlier of:

(1) The day after such dispute resolution efforts end; or

(2) 150 days after the internal grievance was filed if a final decision on the grievance has not been issued.

(c) The period for filing a complaint does not include time spent resolving jurisdictional issues related to a complaint the employee files under State or other applicable law. The time period for filing stops running on the date the complaint under State or other applicable law is filed and begins to run again the day after a final decision on the jurisdictional issues is issued.

(d) If the complaint is not filed during the 90-day period, the Head of Field Element or EC Director (as applicable) will give the complainant an opportunity to show any good reason he may have for not filing within that period, and that official may, in his discretion, accept the complaint for processing.

§ 708.16 Duplicative actions under State or other law.

(a) An employee may not file a complaint under this part if, with respect to the same facts, he chooses to pursue a remedy under State or other applicable law, including final and binding grievance-arbitration procedures, unless:

(1) The complaint under State or other applicable law is dismissed for lack of jurisdiction;

(2) The complaint was filed under 48 CFR part 3, subpart 3.9 and the Inspector General, after conducting an initial inquiry, determines not to pursue it; or

(3) The employee has exhausted grievance-arbitration procedures pursuant to § 708.14, and issues related to alleged retaliation for conduct protected under § 708.5 remain.

(b) Pursuing a remedy other than final and binding grievance-arbitration procedures does not prevent an employee from filing a complaint under this part.

(c) An employee is considered to have filed a complaint under State or other applicable law if he files a complaint, or other pleading, with respect to the same facts in a proceeding established or mandated by State or other applicable law, whether such a complaint is filed before, concurrently with, or after a complaint is filed under this part.

(d) If an employee files a complaint under State or other applicable law after filing a complaint under this part, the complaint under this regulation will be dismissed under § 708.18(c)(3).

§ 708.17 Notification of complaints and opportunities to respond.

(a) By the 15th day after receiving a complaint, the Head of Field Element or EC Director (as applicable) will provide the employer a copy of the complaint. The employer has 15 days from receipt of the complaint to submit any response it wishes to make regarding the allegations in the complaint. The Head of Field Element or EC Director (as applicable) will provide the complainant with a copy of the employer's response. The complainant has 10 days from receipt of the response to submit any additional comments regarding the complaint or the response. The Head of Field Element or EC Director (as applicable) will provide the employer with a copy of those additional comments.

(b) If the complainant is part of a bargaining unit represented for purposes of collective bargaining by a labor organization, the Head of Field Element or EC Director (as applicable) will provide the representative a copy of the complaint by the 15th day after receiving it. The labor organization will be advised that it has 10 days from the receipt of the complaint to submit any comments it wishes to make regarding the allegations in the complaint.

§ 708.18 Dismissal for lack of jurisdiction or other good cause.

(a) The Head of Field Element or EC Director (as applicable) may dismiss a complaint for lack of jurisdiction or for other good cause after receiving the complaint, either on his own initiative or at the request of a party named in the complaint. Such decisions are generally issued by the 20th day after the receipt of the employer's response, but not before the complainant has submitted comments on the response or his time to do so has elapsed, whichever is soonest.

(b) The Head of Field Element or EC Director (as applicable) will notify the complainant by certified mail, return receipt requested, if the complaint is dismissed for lack of jurisdiction or other good cause, will give specific reasons for the dismissal and the contact information for the DOE's Alternative Dispute Resolution Office, and will notify other parties of the dismissal.

(c) Dismissal for lack of jurisdiction or other good cause is appropriate if:

(1) The complaint is untimely; or

(2) The facts, as alleged in the complaint, do not present issues for which relief can be granted under this part; or

(3) The complainant filed a complaint under State or other applicable law with respect to the same facts as alleged in a complaint under this part; or

(4) The complaint is frivolous or without merit on its face; or

(5) The issues presented in the complaint have been rendered moot by subsequent events or substantially resolved; or

(6) The employer has made a formal offer to provide the remedy requested in the complaint or a remedy that DOE considers to be equivalent to what could be provided as a remedy under this part.

§ 708.19 Appealing the dismissal of a complaint by the Head of Field Element or EC Director for lack of jurisdiction or other good cause.

(a) If a complaint is dismissed by the Head of Field Element or EC Director, the administrative process is terminated unless the complainant appeals the dismissal to the OHA Director by the 10th day after receipt of the notice of dismissal as evidenced by a receipt for delivery of certified mail. Decisions not to dismiss may not be appealed.

(b) If the complainant appeals a dismissal to the OHA Director, he must send copies of his appeal to the Head of Field Element or EC Director (as applicable) and all parties. The appeal must include a copy of the notice of dismissal, and state the reasons the dismissal was erroneous.

(c) The OHA Director has all powers necessary to adjudicate the appeal. The OHA Director will issue a decision on the appeal and notify the parties of the decision by the 30th day after it is received. The OHA Director will review findings of fact for clear error and conclusions of law de novo.

(d) The OHA Director's decision, either upholding the dismissal by the Head of Field Element or EC Director or ordering further processing of the complaint, is the final decision on the appeal, unless a party files a petition for Secretarial review by the 30th day after receiving the appeal decision.

§ 708.20 Review by the Secretary of Energy of a decision on appeal of a dismissal.

(a) By the 30th day after receiving a decision on an appeal under § 708.19 from the OHA Director, any party may file a petition for Secretarial review of a dismissal with the Office of Hearings and Appeals. A decision by the OHA Director to reverse a dismissal may not be the subject of a petition for Secretarial review.

(b) By the 15th day after filing the petition for Secretarial review, the petitioning party must file a statement setting forth the arguments in support of its position. A copy of the statement must be served on the other parties, who may file a response by the 20th day after receipt of the statement. Any response must also be served on the other parties.

(c) All submissions permitted under this section must be filed with the Office of Hearings and Appeals.

(d) The Secretary (or his designee) will reverse or revise an appeal decision by the OHA Director only under extraordinary circumstances. Upon consideration of the petition for Secretarial review, the Secretary will direct the OHA Director to issue an order either upholding the dismissal by the Head of Field Element or EC Director or ordering further processing of the complaint. If the dismissal is upheld, this is a final agency action.

Subpart C Investigation, Hearing, and Decision Process

§ 708.21 Referral to the Office of Hearings and Appeals.

(a) If a complaint is not dismissed for lack of jurisdiction or other good cause, the Head of Field Element or EC Director (as applicable) will forward the complaint to the OHA Director by the later of:

(1) The 25th day after receipt of the employer's response, or

(2) The 5th day after receipt of an order to continue processing the complaint following an appeal of dismissal.

(b) The Head of the Field Element or EC Director (as applicable) will notify all parties that the complaint has been referred to the Office of Hearings and Appeals.

(c) The OHA Director and an Administrative Judge appointed to preside over any aspect of a part 708 proceeding are prohibited, beginning with the complaint's referral to the OHA and until a final agency decision is issued, from initiating or otherwise engaging in ex parte discussions with any party on the merits of the complaint.

(d) In all proceedings under this subpart:

(1) The parties have the right to be represented by a person of their choosing or to proceed without representation. The parties are responsible for producing witnesses on their behalf, including requesting the issuance of subpoenas, if necessary;

(2) Formal rules of evidence do not apply, but the OHA may use the Federal Rules of Evidence as a guide.

§ 708.22 Investigation of complaints.

(a) The OHA Director will appoint a person to conduct an investigation. The investigator may not participate or advise in any proceedings in the case subsequent to the investigation's completion.

(b) The investigator will determine the appropriate scope of investigation based on the circumstances of the complaint. The investigator may enter and inspect places and records; make copies of records; interview persons alleged to have been involved in retaliation and other individuals who may have relevant information; take sworn statements; and require the production of any documents or other evidence.

(c) All parties must cooperate fully with the investigator by making all pertinent evidence available. The contractor must make employees available upon request.

(d) A person being interviewed in an investigation has the right to be represented by a person of his choosing.

(e) Parties to the complaint are not entitled to be present at interviews conducted by an investigator.

(f) If a person other than the complainant requests that his identity be kept confidential, the investigator may grant confidentiality, but must advise such person that confidentiality means that the Office of Hearings and Appeals will not identify the person as a source of information to anyone outside the Office of Hearings and Appeals, except as required by statute or other law, or as determined by the OHA Director to be unavoidable.

(g) At any point during the investigation, the investigator may request that the OHA Director appoint an Administrative Judge to whom the complaint will be referred for a decision on whether dismissal is appropriate. The investigator will serve the parties with notice of the referral. The investigator will submit a written statement to the Administrative Judge outlining the reasons he believes dismissal may be appropriate and any facts supporting that belief. The Administrative Judge will then decide whether to dismiss the complaint. In making such decision, the Administrative Judge will have access to the entire investigative file. The Administrative Judge's decision, regardless of outcome, will be served on all the parties. A complaint may be dismissed prior to the completion of the investigation for:

(1) Any reason listed in § 708.18(c), or

(2) Lack of merit, provided the facts obtained by the investigator indicate there is no genuine dispute of material fact.

(h) If the Administrative Judge decides to dismiss the complaint, he will issue an initial agency decision that includes the factual and legal bases for the dismissal. The investigator's written statement will be attached to the Administrative Judge's initial agency decision and served on all the parties. No report of investigation will issue for a complaint dismissed by the Administrative Judge following a referral for dismissal by the investigator.

(i) If the Administrative Judge decides not to dismiss the complaint, he will issue a written statement to that effect which will include the factual and legal basis for his decision. The investigation will then continue. The OHA Director may, at his discretion, appoint a new investigator.

(j) Dismissals under paragraph (h) of this section may be appealed in accordance with the procedures set forth in §§ 708.32, 708.33, 708.34, and 708.35. Decisions not to dismiss under paragraph (i) of this section may not be appealed.

§ 708.23 Time to issue a report of investigation.

(a) If the complaint is not dismissed prior to the completion of the investigation, the investigator will complete the investigation and issue a report of investigation by the 60th day after the complaint is received by the Office of Hearings and Appeals, unless the OHA Director, for good cause, extends the investigation for no more than 30 days. If a case is referred for dismissal by an investigator, the time to issue the report of investigation stops running on the day of referral and, if the Administrative Judge decides against dismissal, begins to run again on the day after the Administrative Judge's decision issues.

(b) The investigator will provide copies of the report of investigation to the parties. The investigation will not be reopened after the report of investigation is issued.

§ 708.24 Hearings not required.

(a) A complainant may withdraw a hearing request after the report of investigation is issued. However, the hearing may be canceled only if all parties agree that they do not want a hearing.

(b) If the hearing is canceled, the Administrative Judge will issue an initial agency decision pursuant to § 708.31 of this subpart.

§ 708.25 Appointment of Administrative Judge.

The OHA Director will appoint an Administrative Judge from the Office of Hearings and Appeals to conduct a hearing.

§ 708.26 Time and location of hearings.

(a) The Administrative Judge will schedule a hearing to be held by the 90th day after issuance of the report of investigation. Any extension of the hearing date must be approved by the OHA Director.

(b) The Administrative Judge will schedule the hearing for a location near the site where the alleged retaliation occurred or the complainant's place of employment, or at another location that is appropriate considering the circumstances of a particular case. Hearings may be conducted by video teleconference or other remote means, at the Administrative Judge's discretion.

§ 708.27 The Administrative Judge may not require that the parties participate in alternative dispute resolution.

The Administrative Judge may recommend, but may not require, that the parties attempt to resolve the complaint through alternative dispute resolution. Within 5 days of appointment, the Administrative Judge will make the contact information for the DOE's Alternative Dispute Resolution Office available to the parties.

§ 708.28 Hearing procedures.

(a) In all hearings under this part:

(1) Testimony of witnesses is given under oath or affirmation, and witnesses must be advised of the applicability of 18 U.S.C. 1001 and 18 U.S.C. 1621, dealing with the criminal penalties associated with false statements and perjury;

(2) Witnesses are subject to cross-examination; and

(3) A court reporter will make a transcript of the hearing.

(b) The Administrative Judge has all powers necessary to regulate the conduct of proceedings, including the following.

(1) The Administrative Judge may order discovery at the request of a party, based on a showing that the requested discovery is designed to produce evidence regarding a matter, not privileged, that is relevant to the subject matter of the complaint.

(2) The Administrative Judge may permit parties to obtain discovery by any appropriate method, including deposition upon oral examination or written questions; written interrogatories; production of documents or things; permission to enter upon land or other property for inspection and other purposes; and requests for admission.

(3) The Administrative Judge may issue subpoenas for the appearance of witnesses on behalf of either party, or for the production of specific documents or other physical evidence.

(4) The Administrative Judge may rule on objections to the presentation of evidence; exclude evidence that is immaterial, irrelevant, or unduly repetitious; require the advance submission of documents offered as evidence; dispose of procedural requests; grant extensions of time; determine the format of the hearing; direct that written motions, documents, or briefs be filed with respect to issues raised during the course of the hearing; ask questions of witnesses; direct that documentary evidence be served upon other parties (under protective order if such evidence is deemed confidential); and otherwise regulate the conduct of the hearing.

(5) The Administrative Judge may, at the request of a party or on his own initiative, dismiss a claim, defense, or party. He may also make adverse findings upon the failure of a party or the party's representative to comply with a lawful order of the Administrative Judge, or, without good cause, to attend a hearing. If the Administrative Judge's rulings result in termination of the proceeding prior to the completion of the hearing, the Administrative Judge will issue an initial agency decision pursuant to § 708.31 of this subpart.

(6) The Administrative Judge, upon request of a party, may allow the parties a reasonable time to file pre-hearing briefs or written statements with respect to material issues of fact or law. Any pre-hearing submission must be limited to the issues specified and filed within the time prescribed by the Administrative Judge.

(7) The parties are entitled to make closing arguments, but post-hearing submissions are only permitted by direction of the Administrative Judge.

(8) Parties allowed to file written submissions must serve copies upon the other parties within the time prescribed by the Administrative Judge.

§ 708.29 Burdens of proof.

The complainant has the burden of establishing by a preponderance of the evidence that he made a disclosure, participated in a proceeding, or refused to participate, as described under § 708.5, and that such act was a contributing factor in one or more alleged acts of retaliation against the complainant by the contractor. Once the complainant has met this burden, the burden shifts to the contractor to prove by clear and convincing evidence that it would have taken the same action without the complainant's disclosure, participation, or refusal.

§ 708.30 Timing for issuing an initial agency decision.

The Administrative Judge will issue an initial agency decision on the complaint by the 60th day after the later of:

(a) The date the Administrative Judge approves the parties' agreement not to hold a hearing;

(b) The date the Administrative Judge receives the transcript of the hearing; or

(c) The date the Administrative Judge receives post-hearing submissions permitted under § 708.28(b)(7) of this subpart.

§ 708.31 Procedure for issuing an initial agency decision.

(a) The Administrative Judge will serve the initial agency decision on all parties.

(b) An initial agency decision issued by the Administrative Judge will contain appropriate findings, conclusions, an order, and the factual basis for each finding, whether or not a hearing has been held on the complaint. In making such findings, the Administrative Judge may rely upon, but is not bound by, the report of investigation.

(c) If the Administrative Judge determines that an act of retaliation has occurred, the initial agency decision will include an order for any form of relief permitted under § 708.36. If the Administrative Judge does not determine that an act of retaliation has occurred, the initial agency decision will state that the complaint is denied.

§ 708.32 Appealing an initial agency decision.

(a) By the 15th day after receiving an initial agency decision from the Administrative Judge, any party may file a notice of appeal with the OHA Director requesting review of the initial agency decision.

(b) A party who appeals an initial agency decision (the appellant) must serve a copy of the notice of appeal on all other parties.

(c) A party who receives an initial agency decision has not exhausted its administrative remedies until an appeal has been filed with the OHA Director and a decision granting or denying the appeal has been issued.

§ 708.33 Procedure for appeals.

(a) By the 15th day after filing a notice of appeal under § 708.32, the appellant must file a statement identifying the issues that it wishes the OHA Director to review. A copy of the statement must be served on the other parties, who may file a response by the 20th day after receipt of the statement. Any response must also be served on the other parties.

(b) In considering the appeal, the OHA Director:

(1) Will possess all powers necessary to adjudicate the appeal.

(2) Will review findings of fact for clear error and conclusions of law de novo; and

(3) Will close the record on appeal after receiving the last submission permitted under this section.

§ 708.34 Procedure for issuing an appeal decision.

(a) If there is no appeal of an initial agency decision, and the time for filing an appeal has passed, the initial agency decision becomes the final agency decision.

(b) If there is an appeal of an initial agency decision, the OHA Director will issue an appeal decision based on the record of proceedings by the 60th day after the record is closed.

(1) An appeal decision issued by the OHA Director will contain appropriate findings, conclusions, an order, and the factual basis for each finding, whether or not a hearing has been held on the complaint. In making such findings, the OHA Director may rely upon, but is not bound by, the report of investigation and/or the initial agency decision.

(2) If the OHA Director determines that an act of retaliation has occurred, the appeal decision will include an order for any form of relief permitted under § 708.36.

(3) If the OHA Director does not determine that the employer has committed an act of retaliation, the appeal decision will deny the complaint.

(4) If the OHA Director determines that the complaint was properly dismissed, the appeal decision will deny the appeal.

(5) If the OHA Director determines that a complaint should not have been dismissed, the appeal decision will vacate the initial agency decision and order further processing of the complaint.

(c) The OHA Director will send an appeal decision to all parties and to the Head of Field Element or EC Director having jurisdiction over the contract under which the complainant was employed when the alleged retaliation occurred.

(d) The appeal decision issued by the OHA Director—other than an appeal decision ordering further processing of a complaint—is the final agency decision unless a party files a petition for Secretarial review by the 30th day after receiving the appeal decision. A decision by the OHA Director to reverse a dismissal may not be the subject of a petition for Secretarial review.

§ 708.35 Review by the Secretary of Energy of an appeal decision.

(a) By the 30th day after receiving an appeal decision from the OHA Director, any party may file a petition for Secretarial review with the Office of Hearings and Appeals.

(b) By the 15th day after filing a petition for Secretarial review, the petitioner must file a statement identifying the issues that it wishes the Secretary to consider. A copy of the statement must be served on the other parties, who may file a response by the 20th day after receipt of the statement. Any response must also be served on the other parties.

(c) All submissions permitted under this section must be filed with the Office of Hearings and Appeals.

(d) The Secretary (or his designee) will reverse or revise an appeal decision by the OHA Director only under extraordinary circumstances. In the event the Secretary determines that a revision in the appeal decision is appropriate, the Secretary will direct the OHA Director to issue a revised decision which is the final agency action on the complaint. In the event the Secretary determines to reverse an appeal decision dismissing the complaint, the Secretary may, as appropriate, direct the OHA Director to issue a revised decision ordering further processing of the complaint. If no further processing is ordered, the Secretary's decision is the final agency action on the complaint.

§ 708.36 Remedies.

(a) General remedies. If the initial or final agency decision determines that an act of retaliation has occurred, it may order:

(1) Reinstatement;

(2) Transfer preference;

(3) Back pay;

(4) Reimbursement of the complainant's reasonable costs and expenses, including attorney and expert-witness fees reasonably incurred to prepare for and participate in proceedings leading to the initial or final agency decision; or

(5) Such other remedies as are deemed necessary to abate the violation and provide the complainant with relief.

(b) Interim relief. If an initial agency decision contains a determination that an act of retaliation occurred, the decision may order the employer to provide the complainant with appropriate interim relief (including reinstatement) pending the outcome of any request for review of the decision by the OHA Director. Such interim relief will not include payment of any money.

§ 708.37 Reimbursement of costs and expenses.

If a complaint is denied by a final agency decision, the complainant will not be reimbursed for the costs and expenses incurred in pursuing the complaint.

§ 708.38 Implementation of final agency decision.

(a) The Head of Field Element having jurisdiction over the contract under which the complainant was employed when the alleged retaliation occurred, or EC Director, will implement a final agency decision by forwarding the decision and order to the contractor, or subcontractor, involved.

(b) An employer's failure or refusal to comply with a final agency decision and order under this regulation may result in a contracting officer's decision to disallow certain costs or terminate the contract for default. In the event of a contracting officer's decision to disallow costs or terminate a contract for default, the contractor may file a claim under the disputes procedures of the contract.

§ 708.39 The Contract Disputes Act.

A final agency decision and order issued pursuant to this regulation is not considered a claim by the government against a contractor or “a decision by the contracting officer” under sections 6 and 7 of the Contract Disputes Act (41 U.S.C. 605 and 41 U.S.C. 606).

§ 708.40 Notice of program requirements.

Employers who are covered by this part must inform their employees about these regulations by posting notices in conspicuous places at the work site. These notices must include the name, address, telephone number, and website or email address of the DOE office where employees can file complaints under this part.

§ 708.41 Referral to another agency.

Notwithstanding the provisions of this part, the Secretary of Energy retains the right to request that a complaint filed under this part be accepted by another Federal agency for investigation and factual determinations.

§ 708.42 Extension of deadlines.

The Secretary of Energy (or the Secretary's designee) may approve the extension of any deadline established by this part, and the OHA Director may approve the extension of any deadline under §§ 708.22 through 708.34 of this subpart (relating to the investigation, hearing, and OHA appeal process). Failure by the DOE to comply with timing requirements does not create a substantive right for any party to overturn a DOE decision on a complaint.

§ 708.43 Affirmative duty not to retaliate.

DOE contractors will not retaliate against any employee because the employee (or any person acting at the request of the employee) has taken an action listed in § 708.5(a) through (c).

PART 709 COUNTERINTELLIGENCE EVALUATION PROGRAM

Authority: 42 U.S.C. 2011, et seq., 7101, et seq., 7144b, et seq., 7383h-1; 50 U.S.C. 2401, et seq.

Source: 71 FR 57392, Sept. 29, 2006, unless otherwise noted.

Subpart A General Provisions

§ 709.1 Purpose.

This part:

(a) Describes the categories of individuals who are subject for counterintelligence evaluation processing;

(b) Provides guidelines for the counterintelligence evaluation process, including the use of counterintelligence-scope polygraph examinations, and for the use of event-specific polygraph examinations; and

(c) Provides guidelines for protecting the rights of individual DOE employees and DOE contractor employees subject to this part.

§ 709.2 Definitions.

For purposes of this part:

Access authorization means an administrative determination under the Atomic Energy Act of 1954, Executive Order 12968, or 10 CFR part 710 that an individual is eligible for access to classified matter or is eligible for access to, or control over, special nuclear material.

Adverse personnel action means:

(1) With regard to a DOE employee, the removal, suspension for more than 14 days, reduction in grade or pay, or a furlough of 30 days or less as described in 5 U.S.C. Chapter 75; or

(2) With regard to a contractor employee, the discharge, discipline, or denial of employment or promotion, or any other discrimination in regard to hire or tenure of employment or any term or condition of employment.

Contractor means any industrial, educational, commercial, or other entity, assistance recipient, or licensee, including an individual who has executed an agreement with DOE for the purpose of performing under a contract, license, or other agreement, and including any subcontractors of any tier.

Counterintelligence or CI means information gathered and activities conducted to protect against espionage, other intelligence activities, sabotage, or assassinations conducted for or on behalf of foreign powers, organizations or persons, or international terrorist activities, but not including personnel, physical, document or communications security programs.

Counterintelligence evaluation or CI evaluation means the process, possibly including a counterintelligence scope polygraph examination, used to make recommendations as to whether certain employees should have access to information or materials protected by this part.

Counterintelligence program office means the Office of Counterintelligence in the Office of Intelligence and Counterintelligence (and any successor office to which that office's duties and authorities may be reassigned).

Counterintelligence-scope or CI-scope polygraph examination means a polygraph examination using questions reasonably calculated to obtain counterintelligence information, including questions relating to espionage, sabotage, terrorism, unauthorized disclosure of classified information, deliberate damage to or malicious misuse of a United States Government information or defense system, and unauthorized contact with foreign nationals.

Covered person means an applicant for employment with DOE or a DOE contractor, a DOE employee, a DOE contractor employee, and an assignee or detailee to DOE from another agency.

DOE means the Department of Energy including the National Nuclear Security Administration (NNSA).

Foreign nexus means specific indications that a covered person is or may be engaged in clandestine or unreported relationships with foreign powers, organizations or persons, or international terrorists; contacts with foreign intelligence services; or other hostile activities directed against DOE facilities, property, personnel, programs or contractors by or on behalf of foreign powers, organizations or persons, or international terrorists.

Human Reliability Program means the program under 10 CFR part 712.

Intelligence means information relating to the capabilities, intentions, or activities of foreign governments or elements thereof, foreign organizations or foreign persons.

Local commuting area means the geographic area that usually constitutes one area for employment purposes. It includes any population center (or two or more neighboring ones) and the surrounding localities in which people live and can reasonably be expected to travel back and forth daily to their usual employment.

Materials means any “nuclear explosive” as defined in 10 CFR 712.3, and any “special nuclear material,” hazardous “source material,” and hazardous “byproduct material” as those terms are defined by the Atomic Energy Act of 1954 (42 U.S.C. 2014).

National security information means information that has been determined pursuant to Executive Order 12958, as amended by Executive Order 13292, or any predecessor order to require protection against unauthorized disclosure and is marked to indicate its classified status when in documentary form.

NNSA means DOE's National Nuclear Security Administration.

No opinion means an evaluation of a polygraph test by a polygraph examiner in which the polygraph examiner cannot render an opinion.

Polygraph examination means all activities that take place between a Polygraph Examiner and an examinee (person taking the test) during a specific series of interactions, including the pretest interview, the use of the polygraph instrument to collect physiological data from the examinee while presenting a series of tests, the test data analysis phase, and the post-test phase.

Polygraph examination records means all records of the polygraph examination, including the polygraph report, audio-video recording, and the polygraph consent form.

Polygraph instrument means a diagnostic instrument used during a polygraph examination, which is capable of monitoring, recording and/or measuring at a minimum, respiratory, electrodermal, and cardiovascular activity as a response to verbal or visual stimuli.

Polygraph report means a document that may contain identifying data of the examinee, a synopsis of the basis for which the examination was conducted, the relevant questions utilized, and the examiner's conclusion.

Polygraph test means that portion of the polygraph examination during which the polygraph instrument collects physiological data based upon the individual's responses to questions from the examiner.

Program Manager means a DOE official designated by the Secretary or the Head of a DOE Element to make an access determination under this part.

Random means a statistical process whereby eligible employees have an equal probability of selection for a CI evaluation each time the selection process occurs.

Regular and routine means access by individuals without further permission more than two times per calendar quarter.

Relevant questions are those questions used during the polygraph examination that pertain directly to the issues for which the examination is being conducted.

Restricted data means all data concerning the design, manufacture, or utilization of atomic weapons; the production of special nuclear material; or the use of special nuclear material in the production of energy, but does not include data declassified or removed from the restricted data category pursuant to section 142 of the Atomic Energy Act of 1954.

Secret means the security classification that is applied to DOE-generated information or material the unauthorized disclosure of which reasonably could be expected to cause serious damage to the national security.

Secretary means the Secretary of Energy or the Secretary's designee.

Significant response means an opinion that the analysis of the polygraph charts reveals consistent, significant, timely physiological responses to the relevant questions.

Special Access Program or SAP means a program established under Executive Order 12958 for a specific class of classified information that imposes safeguarding and access requirements that exceed those normally required for information at the same classification level.

Suspend means temporarily to withdraw an employee's access to information or materials protected under § 709.3 of this part.

System Administrator means any individual who has privileged system, data, or software access that permits that individual to exceed the authorization of a normal system user and thereby override, alter, or negate integrity verification and accountability procedures or other automated and/or technical safeguards provided by the systems security assets for normal users.

Top Secret means the security classification that is applied to DOE-generated information or material the unauthorized disclosure of which reasonably could be expected to cause exceptionally grave damage to the national security.

Unresolved issues means an opinion by a CI evaluator that the analysis of the information developed during a CI evaluation remains inconclusive and needs further clarification before a CI access recommendation can be made.

§ 709.3 Covered persons subject to a CI evaluation and polygraph.

(a) Mandatory CI evaluation. Except as provided in § 709.5 of this part with regard to waivers, a CI evaluation, which may include a CI-scope polygraph examination, is required for any covered person in any category under paragraph (b) of this section who will have or has access to classified information or materials protected under this paragraph. Such an evaluation is required for covered persons who are incumbent employees at least once every five years. DOE, in its sole discretion, may require a CI-scope polygraph examination:

(1) If the CI evaluation reveals foreign nexus issues;

(2) If a covered person who is an incumbent employee is to be assigned within DOE to activities involving another agency and a polygraph examination is required as a condition of access to the activities by the other agency; or

(3) If a covered person who is an incumbent employee is proposed to be assigned or detailed to another agency and the receiving agency requests DOE to administer a polygraph examination as a condition of the assignment or detail.

(b) Paragraph (a) of this section applies to covered persons:

(1) In an intelligence or counterintelligence program office (or with programmatic reporting responsibility to an intelligence or counterintelligence program office) because of access to classified intelligence information, or sources, or methods;

(2) With access to Sensitive Compartmented Information;

(3) With access to information that is protected within a non-intelligence Special Access Program (SAP) designated by the Secretary;

(4) With regular and routine access to Top Secret Restricted Data;

(5) With regular and routine access to Top Secret National Security Information; and

(6) Designated, with approval of the Secretary, on the basis of a risk assessment consistent with paragraphs (e) and (f) of this section, by a Program Manager for the following DOE offices and programs (and any successors to those offices and programs): The Office of the Secretary; the Human Reliability Program; the National Nuclear Security Administration (including the Office of Emergency Operations); and the Office of Health, Safety and Security.

(c) Random CI evaluation. Except as provided in § 709.5 of this part with regard to waivers, DOE may require a CI evaluation, including a CI-scope polygraph examination, of covered persons who are incumbent employees selected on a random basis from the following:

(1) All covered persons identified in § 709.3(b);

(2) All employees in the Office of Independent Oversight (or any successor office) within the Office of Health, Safety and Security because of access to classified information regarding the inspection and assessment of safeguards and security functions, including cyber security, of the DOE;

(3) All employees in other elements of the Office of Health, Safety and Security (or any successor office) because of their access to classified information;

(4) All employees in the NNSA Office of Emergency Operations (OEO or any successor office) including DOE field offices or contractors who support OEO because of their access to classified information;

(5) All employees with regular and routine access to classified information concerning: The design and function of nuclear weapons use control systems, features, and their components (currently designated as Sigma 15); vulnerability of nuclear weapons to deliberate unauthorized nuclear detonation (currently designated as Sigma 14); and improvised nuclear device concepts or designs; and

(6) Any system administrator with access to a system containing classified information, as identified by the DOE or NNSA Chief Information Officer.

(d) Specific incident polygraph examinations. In response to specific facts or circumstances with potential counterintelligence implications with a defined foreign nexus, the Director of the Office of Intelligence and Counterintelligence (or, in the case of a covered person in NNSA, the Administrator of NNSA, after consideration of the recommendation of the Director, Office of Intelligence and Counterintelligence) may require a covered person with access to DOE classified information or materials to consent to and take an event-specific polygraph examination. Except as otherwise determined by the Secretary, on the recommendation of the appropriate Program Manager, if a covered person with access to DOE classified information or materials refuses to consent to or take a polygraph examination under this paragraph, then the Director of the Office of Intelligence and Counterintelligence (or, in the case of a covered person in NNSA, the Administrator of NNSA, after consideration of the recommendation of the Director, Office of Intelligence and Counterintelligence) shall direct the denial of access (if any) to classified information and materials protected under paragraphs (b) and (c) of this section, and shall refer the matter to the Office of Health, Safety and Security for a review of access authorization eligibility under 10 CFR part 710. In addition, in the circumstances described in this paragraph, any covered person with access to DOE classified information or material may request a polygraph examination.

(e) Risk assessment. For the purpose of deciding whether to designate or remove employees for mandatory CI evaluations under paragraph (b)(6) of this section, Program Managers may consider:

(1) Access on a non-regular and non-routine basis to Top Secret Restricted Data or Top Secret National Security Information or the nature and extent of access to other classified information;

(2) Unescorted or unrestricted access to significant quantities or forms of special nuclear materials; and

(3) Any other factors concerning the employee's responsibilities that are relevant to determining risk of unauthorized disclosure of classified information or materials.

(f) Based on the risk assessments conducted under paragraph (e) of this section and in consultation with the Director of the Office of Intelligence and Counterintelligence, the Program Manager shall provide recommendations as to positions to be designated or removed under paragraph (b)(6) of this section for approval by the Secretary. Recommendations shall include a summary of the basis for designation or removal of the positions and of the views of the Director of the Office of Intelligence and Counterintelligence as to the recommendations.

(g) Not less than once every calendar year quarter, the responsible Program Manager must provide a list of all incumbent employees who are covered persons under paragraphs (b) and (c) of this section to the Director of the Office of Intelligence and Counterintelligence.

§ 709.4 Notification of a CI evaluation.

(a) If a polygraph examination is scheduled, DOE must notify the covered person, in accordance with § 709.21 of this part.

(b) Any job announcement or posting with respect to any position with access to classified information or materials protected under § 709.3(b) and (c) of this part should indicate that DOE may condition the selection of an individual for the position (709.3(b)) or retention in that position (709.3(b) and (c)) upon his or her successful completion of a CI evaluation, including a CI-scope polygraph examination.

(c) Advance notice will be provided to the affected Program Manager and laboratory/site/facility director of the covered persons who are included in any random examinations that are administered in accordance with provisions at § 709.3(c).

§ 709.5 Waiver of polygraph examination requirements.

(a) General. Upon a waiver request submitted under paragraph (b) of this section, DOE may waive the CI-scope polygraph examination under § 709.3 of this part for:

(1) Any covered person based upon certification from another Federal agency that the covered person has successfully completed a full scope or CI-scope polygraph examination administered within the previous five years;

(2) Any covered person who is being treated for a medical or psychological condition that, based upon consultation with the covered person and appropriate medical personnel, would preclude the covered person from being tested; or

(3) Any covered person in the interest of national security.

(b) Submission of Waiver Requests. A covered person may submit a request for waiver under this section, and the request shall assert the basis for the waiver sought and shall be submitted, in writing, to the Director, Office of Intelligence and Counterintelligence, at the following address: U.S. Department of Energy, Attn: Director, Office of Intelligence and Counterintelligence, 1000 Independence Avenue, SW., Washington, DC 20585.

(c) Disposition of Waiver Requests. The Director, Office of Intelligence and Counterintelligence, shall issue a written decision on a request for waiver prior to the administration of a polygraph examination. The Director shall obtain the concurrence of the Secretary in his or her decision on a request for waiver under § 709.5(a)(3) and shall obtain the concurrence of the Administrator of NNSA in a decision on a waiver request from an NNSA covered person under § 709.5(a)(1) and § 709.5(a)(2). Notification of approval of a waiver request will contain information regarding the duration of the waiver and any other relevant information. Notification of the denial of a waiver request will state the basis for the denial and state that the covered person may request reconsideration of the denial by the Secretary under § 709.5(d).

(d) Reconsideration Rights. If a waiver is denied, the covered person may file with the Secretary a request for reconsideration of the denial within 30 days of receipt of the decision, and the Secretary's decision will be issued prior to the administration of a polygraph examination.

Subpart B CI Evaluation Protocols and Protection of National Security

§ 709.10 Scope of a counterintelligence evaluation.

A counterintelligence evaluation consists of a counterintelligence-based review of the covered person's personnel security file and review of other relevant information available to DOE in accordance with applicable guidelines and authorities. As provided in § 709.3(b), DOE also may require a CI-scope polygraph examination. As provided for in § 709.3(c), a CI evaluation, if conducted on a random basis, will include a CI-scope polygraph examination. As set forth in § 709.15(b) and (c) of this part, a counterintelligence evaluation may also include other pertinent measures to address and resolve counterintelligence issues in accordance with Executive Order 12333, the DOE “Procedures for Intelligence Activities,” and other relevant laws, guidelines and authorities, as applicable.

§ 709.11 Topics within the scope of a polygraph examination.

(a) DOE may ask questions in a specific incident polygraph examination that are appropriate for a CI-scope examination or that are relevant to the counterintelligence concerns with a defined foreign nexus raised by the specific incident.

(b) A CI-scope polygraph examination is limited to topics concerning the covered person's involvement in espionage, sabotage, terrorism, unauthorized disclosure of classified information, unauthorized foreign contacts, and deliberate damage to or malicious misuse of a U.S. government information or defense system.

(c) DOE may not ask questions that:

(1) Probe a covered person's thoughts or beliefs;

(2) Concern conduct that has no CI implication with a defined foreign nexus; or

(3) Concern conduct that has no direct relevance to a CI evaluation.

§ 709.12 Defining polygraph examination questions.

The examiner determines the exact wording of the polygraph questions based on the examiner's pretest interview of the covered person, the covered person's understanding of the questions, established test question procedures from the Department of Defense Polygraph Institute, and other input from the covered person.

§ 709.13 Implications of refusal to take a polygraph examination.

(a) Subject to § 709.14 of this part, a covered person may refuse to take a polygraph examination pursuant to § 709.3 of this part, and a covered person being examined may terminate the examination at any time.

(b) If a covered person terminates a polygraph examination prior to the completion of the examination, DOE may treat that termination as a refusal to complete a CI evaluation under § 709.14 of this part.

§ 709.14 Consequences of a refusal to complete a CI evaluation including a polygraph examination.

(a) If a covered person is an applicant for employment or assignment or a potential detailee or assignee with regard to an identified position and the covered person refuses to complete a CI evaluation including a polygraph examination required by this part as an initial condition of access, DOE and its contractors must refuse to employ, assign, or detail that covered person with regard to the identified position.

(b) If a covered person is an incumbent employee in an identified position subject to a CI evaluation including a polygraph examination under § 709.3(b), (c), or (d), and the covered person refuses to complete a CI evaluation, DOE and its contractors must deny that covered person access to classified information and materials protected under § 709.3(b) and (c) and may take other actions consistent with the denial of access, including administrative review of access authorization under 10 CFR part 710. If the covered person is a DOE employee, DOE may reassign or realign the DOE employee's duties, or take other action, consistent with that denial of access and applicable personnel regulations.

(c) If a DOE employee refuses to take a CI polygraph examination, DOE may not record the fact of that refusal in the employee's personnel file.

§ 709.15 Processing counterintelligence evaluation results.

(a) If the reviews under § 709.10 or a polygraph examination present unresolved foreign nexus issues that raise significant questions about the covered person's access to classified information or materials protected under § 709.3 of this part that justified the counterintelligence evaluation, DOE may undertake a more comprehensive CI evaluation that, in appropriate circumstances, may include evaluation of financial, credit, travel, and other relevant information to resolve any identified issues. Participation by Office of Intelligence and Counterintelligence personnel in any such evaluation is subject to Executive Order 12333, the DOE “Procedures for Intelligence Activities,” and other relevant laws, guidelines, and authorities as may be applicable with respect to such matters.

(b) The Office of Intelligence and Counterintelligence, in coordination with NNSA with regard to issues concerning a NNSA covered person, may conduct an in-depth interview with the covered person, may request relevant information from the covered person, and may arrange for the covered person to undergo an additional polygraph examination.

(c) Whenever information is developed by the Office of Health, Safety and Security indicating counterintelligence issues, the Director of that Office shall notify the Director, Office of Intelligence and Counterintelligence.

(d) If, in carrying out a comprehensive CI evaluation of a covered person under this section, there are significant unresolved issues, not exclusively related to polygraph examination results, indicating counterintelligence issues, then the Director, Office of Intelligence and Counterintelligence shall notify the DOE national laboratory director (if applicable), plant manager (if applicable) and program manager(s) for whom the individual works that the covered person is undergoing a CI evaluation pursuant to this part and that the evaluation is not yet complete.

(e) Utilizing the DOE security criteria in 10 CFR part 710, the Director, Office of Intelligence and Counterintelligence, makes a determination whether a covered person completing a CI evaluation has made disclosures that warrant referral, as appropriate, to the Office of Health, Safety and Security or the Manager of the applicable DOE/NNSA Site, Operations Office or Service Center.

§ 709.16 Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI evaluations.

(a) General. If the results of a counterintelligence evaluation are not dispositive, the Director of the Office of Intelligence and Counterintelligence may convene a Counterintelligence Evaluation Review Board to obtain the individual views of each member as assistance in resolving counterintelligence issues identified during a counterintelligence evaluation.

(b) Composition. A Counterintelligence Evaluation Review Board is chaired by the Director of the Office of Intelligence and Counterintelligence (or his/her designee) and includes representation from the appropriate line Program Managers, lab/site/facility management (if a contractor employee is involved), NNSA, if the unresolved issues involve an NNSA covered person, the DOE Office of Health, Safety and Security and security directors for the DOE or NNSA site or operations office.

(c) Process. When making a final recommendation under § 709.17 of this part, to a Program Manager, the Director of Intelligence and Counterintelligence shall report on the Counterintelligence Evaluation Review Board's views, including any consensus recommendation, or if the members are divided, a summary of majority and dissenting views.

§ 709.17 Final disposition of CI evaluation findings and recommendations.

(a) Following completion of a CI evaluation, the Director of the Office of Intelligence and Counterintelligence must recommend, in writing, to the appropriate Program Manager that the covered person's access be approved or retained, or denied or revoked.

(b) If the Program Manager agrees with the recommendation, the Program Manager notifies the covered person that the covered person's access has been approved or retained, or denied or revoked.

(c) If the Program Manager disagrees with the recommendation of the Director, Office of Intelligence and Counterintelligence, the matter is referred to the Secretary for a final decision.

(d) If the Program Manager denies or revokes a DOE employee's access, DOE may reassign the employee or realign the employee's duties within the local commuting area or take other actions consistent with the denial of access.

(e) If the Program Manager revokes the access of a covered person assigned or detailed to DOE, DOE may remove the assignee or detailee from access to the information that justified the CI evaluation and return the assignee or detailee to the agency of origin.

(f) Covered persons whose access is denied or revoked may request reconsideration by the head of the relevant DOE element.

(g) For cases involving a question of loyalty to the United States, the Director of the Office of Intelligence and Counterintelligence may refer the matter to the FBI as required by section 145d of the Atomic Energy Act of 1954. For cases indicating that classified information is being, or may have been, disclosed in an unauthorized manner to a foreign power or an agent of a foreign power, DOE is required by 50 U.S.C. 402a(e) to refer the matter to the Federal Bureau of Investigation.

Subpart C Safeguarding Privacy and Employee Rights

§ 709.21 Requirements for notification of a polygraph examination.

When a polygraph examination is scheduled, the DOE must notify the covered person, in writing, of the date, time, and place of the polygraph examination, the provisions for a medical waiver, and the covered person's right to obtain and consult with legal counsel or to secure another representative prior to the examination. DOE must provide a copy of this part to the covered person. The covered person must receive the notification at least ten days, excluding weekend days and holidays, before the time of the examination except when good cause is shown or when the covered person waives the advance notice provision.

§ 709.22 Right to counsel or other representation.

(a) At the covered person's own expense, a covered person has the right to obtain and consult with legal counsel or another representative. However, the counsel or representative may not be present during the polygraph examination. Except for interpreters and signers, no one other than the covered person and the examiner may be present in the examination room during the polygraph examination.

(b) A covered person has the right to consult with legal counsel or another representative at any time during an interview conducted in accordance with § 709.15 of this part.

§ 709.23 Obtaining consent to a polygraph examination.

DOE may not administer a polygraph examination unless DOE:

(a) Notifies the covered person of the polygraph examination in writing in accordance with § 709.21 of this part; and

(b) Obtains written consent from the covered person prior to the polygraph examination.

§ 709.24 Other information provided to a covered person prior to a polygraph examination.

Before administering the polygraph examination, the examiner must:

(a) Inform the covered person that audio and video recording of each polygraph examination session will be made, and that other observation devices, such as two-way mirrors and observation rooms, also may be employed;

(b) Explain to the covered person the characteristics and nature of the polygraph instrument and examination;

(c) Explain to the covered person the physical operation of the instrument and the procedures to be followed during the examination;

(d) Review with the covered person the relevant questions to be asked during the examination;

(e) Advise the covered person of the covered person right against self-incrimination; and

(f) Provide the covered person with a pre-addressed envelope, which may be used to submit a quality assurance questionnaire, comments or complaints concerning the examination.

§ 709.25 Limits on use of polygraph examination results that reflect “Significant Response” or “No Opinion”.

DOE or its contractors may not:

(a) Take an adverse personnel action against a covered person or make an adverse access recommendation solely on the basis of a polygraph examination result of “significant response” or “no opinion”; or

(b) Use a polygraph examination that reflects “significant response” or “no opinion” as a substitute for any other required investigation.

§ 709.26 Protection of confidentiality of CI evaluation records to include polygraph examination records and other pertinent documentation.

(a) DOE owns all CI evaluation records, including polygraph examination records and reports and other evaluation documentation.

(b) DOE maintains all CI evaluation records, including polygraph examination records and other pertinent documentation acquired in conjunction with a counterintelligence evaluation, in a system of records established under the Privacy Act of 1974 (5 U.S.C. 552a).

(c) DOE must afford the full privacy protection provided by law to information regarding a covered person's refusal to participate in a CI evaluation to include a polygraph examination and the completion of other pertinent documentation.

(d) With the exception of the polygraph report, all other polygraph examination records are destroyed ninety days after the CI evaluation is completed, provided that a favorable recommendation has been made to grant or continue the access to the position. If a recommendation is made to deny or revoke access to the information or involvement in the activities that justified conducting the CI evaluation, then all of the polygraph examination records are retained until the final resolution of any request for reconsideration by the covered person or the completion of any ongoing investigation.

Subpart D Polygraph Examination and Examiner Standards

§ 709.31 DOE standards for polygraph examiners and polygraph examinations.

(a) DOE adheres to the procedures and standards established by the Department of Defense Polygraph Institute (DODPI). DOE administers only DODPI approved testing formats.

(b) A polygraph examiner may administer no more than five polygraph examinations in any twenty-four hour period. This does not include those instances in which a covered person voluntarily terminates an examination prior to the actual testing phase.

(c) The polygraph examiner must be certified to conduct polygraph examinations under this part by the DOE Psychophysiological Detection of Deception/Polygraph Program Quality Control Official.

(d) To be certified under paragraph (c) of this section, an examiner must have the following minimum qualifications:

(1) The examiner must be an experienced CI or criminal investigator with extensive additional training in using computerized instrumentation in Psychophysiological Detection of Deception and in psychology, physiology, interviewing, and interrogation.

(2) The examiner must have a favorably adjudicated single-scope background investigation, complete a CI-scope polygraph examination, and must hold a “Q” access authorization, which is necessary for access to Secret Restricted Data and Top Secret National Security Information. In addition, he or she must have been granted SCI access approval.

(3) The examiner must receive basic Forensic Psychophysiological Detection of Deception training from the DODPI.

§ 709.32 Training requirements for polygraph examiners.

(a) Examiners must complete an initial training course of thirteen weeks, or longer, in conformance with the procedures and standards established by DODPI.

(b) Examiners must undergo annual continuing education for a minimum of forty hours training within the discipline of Forensic Psychophysiological Detection of Deception.

(c) The following organizations provide acceptable curricula to meet the training requirement of paragraph (b) of this section:

(1) American Polygraph Association,

(2) American Association of Police Polygraphists, and

(3) Department of Defense Polygraph Institute.

PART 710 PROCEDURES FOR DETERMINING ELIGIBILITY FOR ACCESS TO CLASSIFIED MATTER AND SPECIAL NUCLEAR MATERIAL OR ELIGIBILITY TO HOLD A SENSITIVE POSITION

Authority: 42 U.S.C. 2165, 2201, 5815, 7101, et seq., 7383h-l; 50 U.S.C. 2401 et seq.; E.O. 10865, 3 CFR 1959-1963 comp., p. 398, as amended, 3 CFR Chap. IV; E.O. 13526, 3 CFR 2010 Comp., pp. 298-327 (or successor orders); E.O. 12968, 3 CFR 1995 Comp., p. 391; E.O. 13467, 3 CFR 2008 Comp., p. 196.

Source: 81 FR 71335, Oct. 17, 2016, unless otherwise noted.

Subpart A General Provisions

§ 710.1 Purpose.

(a) This part establishes the procedures for determining the eligibility of individuals described in § 710.2 for access to classified matter or special nuclear material, pursuant to the Atomic Energy Act of 1954, or for access to national security information in accordance with E.O. 13526 (Classified National Security Information), or eligibility to hold a sensitive position pursuant to E.O. 13467 (Reforming Processes Related to Suitability for Government Employment, Fitness for Contractor Employees, and Eligibility for Access to Classified National Security Information).

(b) This part implements: E.O. 12968, 60 FR 40245 (August 2, 1995), as amended; E.O. 13526, 75 FR 707 (January 5, 2010) as amended; E.O. 10865, 25 FR 1583 (February 24, 1960), as amended; E.O. 13467, 73 FR 38103 (June 30, 2008) as amended; and the National Security Adjudicative Guidelines, issued as SEAD 4, by the Director of National Intelligence on December 10, 2016, or successor directive.

[89 FR 59595, July 23, 2024]

§ 710.2 Scope.

(a) The procedures outlined in this part apply to determinations of eligibility for access authorization or eligibility to hold a sensitive position for:

(1) Employees (including consultants) of, and applicants for employment with, contractors and agents of the DOE;

(2) Access permittees of the DOE and their employees (including consultants) and applicants for employment;

(3) Employees (including consultants) of, and applicants for employment with, the DOE; and

(4) Other persons designated by the Secretary of Energy.

(b) To the extent the procedures in this part apply to determinations of eligibility for access to classified information or special nuclear material, they shall also apply to determinations of eligibility to hold a sensitive position, except as specifically noted.

[89 FR 59595, July 23, 2024]

§ 710.3 [Reserved]
§ 710.4 Policy.

(a) It is the policy of DOE to provide for the security of its programs in a manner consistent with traditional American concepts of justice and fairness. To this end, the Secretary has established procedures that will afford those individuals described in § 710.2 the opportunity for administrative review of questions concerning their eligibility for access authorization or eligibility to hold a sensitive position.

(b) It is also the policy of DOE that none of the procedures established for determining eligibility for access authorization or eligibility to hold a sensitive position shall be used for an improper purpose, including any attempt to coerce, restrain, threaten, intimidate, or retaliate against individuals for exercising their rights under any statute, regulation or DOE directive. Any DOE officer or employee violating, or causing the violation of this policy, shall be subject to appropriate disciplinary action.

[89 FR 59595, July 23, 2024]

§ 710.5 Definitions.

(a) As used in this part:

Access authorization means an administrative determination that an individual is eligible for access to classified matter or is eligible for access to, or control over, special nuclear material.

Administrative Judge means a DOE attorney appointed by the Director, Office of Hearings and Appeals, pursuant to § 710.25 of this part. An Administrative Judge shall be a U.S. citizen and shall hold a Q access authorization.

Classified matter means the material of thought or expression that is classified pursuant to statute or Executive Order.

Continuous vetting means reviewing the background of an individual described in § 710.2(a)(1) through (4) at any time to determine whether that individual continues to meet applicable requirements for access authorization or a sensitive position.

Director means the Director, DOE Office of Departmental Personnel Security.

DOE Counsel means a DOE attorney assigned to represent DOE in proceedings under this part. DOE Counsel shall be a U.S. citizen and shall hold a Q access authorization.

Local Director of Security means the individual with primary responsibility for safeguards and security at the Idaho Operations Office; for the Office of Environmental Management (EM), the individual(s) designated in writing by the Senior Advisor, or delegee; for the Office of Science (SC), the individual designated in writing by the Deputy Director for Operations; for Naval Reactors, the individual(s) designated under the authority of the Director, Security Naval Nuclear Propulsion Program; for the National Nuclear Security Administration (NNSA), the individual(s) designated in writing by the Chief, Defense Nuclear Security; and for DOE Headquarters cases the Director, Office of Headquarters Personnel Security Operations.

Manager means the senior Federal official at the Idaho, Richland (to include the Office of River Protection) Operations Offices; for the Office of Environmental Management, the individual(s) designated in writing by the Senior Advisor, or delegee; for the Office of Science (SC), the individual designated in writing by the Deputy Director for Operations; for Naval Reactors, the individual designated under the authority of the Director, Security Naval Nuclear Propulsion Program; for the NNSA, the individual designated in writing by the NNSA Administrator or Deputy Administrator; and for DOE Headquarters cases, the Director, Office of Headquarters Security Vetting.

Secretary means the Secretary of Energy, as provided by section 201 of the Department of Energy Organization Act.

Sensitive position means any position within or in support of a department or agency, the occupant of which could bring about, by virtue of the nature of the position, a material adverse effect on the national security, regardless of whether the occupant has access to classified information, and regardless of whether the occupant is an employee, a military service member, or a contractor. Sensitive positions for the purpose of this part only include individuals designated by DOE in non-critical sensitive, critical sensitive or special sensitive positions.

Special nuclear material means plutonium, uranium enriched in the isotope 233, or in the isotope 235, and any other material which, pursuant to the provisions of section 51 of the Atomic Energy Act of 1954, has been determined to be special nuclear material, but does not include source material; or any material artificially enriched by any of the foregoing, not including source material.

(b) [Reserved]

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59595, July 23, 2024]

Subpart B Eligibility for Access to Classified Matter or Special Nuclear Material

§ 710.6 Cooperation by the individual.

(a)(1) It is the responsibility of the individual to provide full, frank, and truthful answers to DOE's relevant and material questions, and when requested, to furnish or authorize others to furnish information that the DOE deems pertinent to the individual's eligibility for access authorization. This obligation to cooperate applies when completing security forms, during the course of a personnel security background investigation, reinvestigation or continuous vetting, and at any stage of DOE's processing of the individual's access authorization request, including but not limited to, personnel security consultations, DOE-sponsored mental health evaluations, and other authorized DOE actions under this part. The individual may elect not to cooperate; however, such refusal may prevent DOE from reaching an affirmative finding required for granting or continuing the access authorization. In this event, for incumbents any access authorization then in effect may be administratively withdrawn or, for applicants, further processing may be administratively terminated.

(2) It is the responsibility of an individual subject to 10 CFR 709.3(d) to consent to and take a polygraph examination required by part 709. A refusal to consent to or take such an examination may prevent DOE from reaching an affirmative finding required for continuing access authorization. In this event, any access authorization then in effect may be administratively withdrawn.

(b) If the individual believes that the provisions of paragraph (a) of this section have been inappropriately applied, the individual may file a written appeal of the action with the Director within 30 calendar days of the date the individual was notified of the action.

(c) Upon receipt of the written appeal, the Director shall conduct an inquiry as to the circumstances involved in the action and shall, within 30 calendar days of receipt of the written appeal, notify the individual, in writing, of their decision. If the Director determines that the action was inappropriate, the Director shall notify the Manager that access authorization must be reinstated or, for applicants, that the individual must continue to be processed for access authorization. If the Director determines the action was appropriate, the Director shall notify the individual of this fact in writing. The Director's decision is final and not subject to further review or appeal.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59596, July 23, 2024]

§ 710.7 Application of the National Security Adjudicative Guidelines.

(a) The decision on an access authorization request is a comprehensive, common-sense judgment, made after consideration of all relevant information, favorable and unfavorable, as to whether the granting or continuation of access authorization will not endanger the common defense and security and is clearly consistent with the national interest. Any doubt as to an individual's access authorization eligibility shall be resolved in favor of the national security.

(b) All such determinations shall be based upon the application of the National Security Adjudicative Guidelines (Adjudicative Guidelines), or any successor national standard issued under authority of the President.

(c) Each Adjudicative Guideline sets forth a series of concerns that may create a doubt regarding an individual's eligibility for access authorization. In resolving these concerns, all DOE officials involved in the decision-making process shall consider: The nature, extent, and seriousness of the conduct; the circumstances surrounding the conduct, to include knowledgeable participation; the frequency and recency of the conduct; the age and maturity of the individual at the time of the conduct; the voluntariness of participation; the absence or presence of rehabilitation or reformation and other pertinent behavioral changes; the motivation for the conduct; the potential for pressure, coercion, exploitation, or duress; the likelihood of continuation or recurrence; and other relevant and material factors.

(d) If the investigative results report of an individual or other reliable information tend to establish the validity and significance of one or more areas of concern as set forth in the Adjudicative Guidelines, such information shall be regarded as derogatory and create a question as to the individual's access authorization eligibility. Absent any derogatory information, a favorable determination will be made as to access authorization eligibility.

[81 FR 71335, Oct. 17, 2016, as amended at 82 FR 57107, Dec. 4, 2017; 89 FR 59596, July 23, 2024]

§ 710.8 Action on derogatory information.

(a) If a question arises as to the individual's access authorization eligibility, the Local Director of Security shall authorize the conduct of a consultation with the individual, or other appropriate actions and, on the basis of the results of such consultation or actions, may authorize the granting of the individual's access authorization. If, in the opinion of the Local Director of Security, the question as to the individual's access authorization eligibility has not been favorably resolved, the Local Director of Security shall submit the matter to the Manager with a recommendation that authority be obtained to process the individual's case under administrative review procedures set forth in this part.

(b) If the Manager agrees that unresolved derogatory information is present and that appropriate attempts to resolve such derogatory information have been unsuccessful, the Manager shall notify the Director of the proposal to conduct an administrative review proceeding, accompanied by an explanation of the security concerns and a duplicate Personnel Security File. If the Manager believes that the derogatory information has been favorably resolved, the Manager shall direct that access authorization be granted for the individual. The Manager may also direct the Local Director of Security to obtain additional information prior to deciding whether to grant the individual access authorization or to submit a request for authority to conduct an administrative review proceeding. A decision in the matter shall be rendered by the Manager within 10 calendar days of its receipt.

(c) Upon receipt of the Manager's notification, the Director shall review the matter and confer with the Manager on:

(1) The institution of administrative review proceedings set forth in §§ 710.20 through 710.30;

(2) The granting of access authorization; or

(3) Other actions as the Director deems appropriate.

(d) The Director shall act pursuant to one of these options within 30 calendar days of receipt of the Manager's notification unless an extension is granted by the Deputy Director for Security, Office of Environment, Health, Safety and Security.

[81 FR 71335, Oct. 17, 2016, as amended at 88 FR 41292, June 26, 2023; 89 FR 59596, July 23, 2024]

§ 710.9 Suspension of access authorization.

(a) If derogatory information is received, the Local Director of Security shall authorize action(s), to be taken on an expedited basis, to resolve the question pursuant to § 710.8(a). If the question as to the individual's continued access authorization eligibility is not resolved in favor of the individual, the Local Director of Security shall submit the matter to the Manager with the recommendation that the individual's access authorization be suspended pending the final determination resulting from the procedures set forth in this part.

(b) If the information received is determined to represent an immediate threat to national security or to the safety or security of a DOE facility or employee, or is determined to be so serious in nature that action(s) to resolve the matter as set forth in § 710.8(b) are not practical or advisable, the Local Director of Security shall immediately submit the matter to the Manager with a recommendation that the individual's access authorization be suspended pending the final determination resulting from the procedures set forth in this part. The Manager shall either authorize the immediate suspension of access authorization, or shall direct the Local Director of Security to take action(s) as set forth in § 710.8(b), in an expedited manner, to resolve the matter.

(c) The Manager shall, within two working days of receipt of the recommendation from the Local Director of Security to suspend the individual's DOE access authorization:

(1) Approve the suspension of access authorization; or

(2) Direct the continuation of access authorization, or

(3) Take or direct other such action(s) as the Manager deems appropriate.

(d) Upon suspension of an individual's access authorization pursuant to paragraph (c)(1) of this section, the individual, the individual's employer, any other DOE office or program having an access authorization interest in the individual, and, if known, any other government agency where the individual holds an access authorization, security clearance, or access approval, or to which the DOE has certified the individual's DOE access authorization, shall be notified immediately in writing. The appropriate DOE database for tracking access authorizations and related actions shall also be updated. Notification to the individual shall reflect, in general terms, the reason(s) why the suspension has been affected. Pending final determination of the individual's eligibility for access authorization from the operation of the procedures set forth in this part, the individual shall not be afforded access to classified matter, special nuclear material, or unescorted access to security areas that require the individual to possess a DOE access authorization.

(e) Written notification to the individual shall include notification that if the individual believes that the action to suspend their access authorization was taken as retaliation against the individual for having made a protected disclosure, as defined in Presidential Policy Directive 19, Protecting Whistleblowers with Access to Classified Information, or any successor directive issued under the authority of the President, the individual may submit a request for review of this matter directly to the DOE Office of the Inspector General. Such a request shall have no impact upon the continued processing of the individual's access authorization eligibility under this part. If the individual receives an adverse final agency determination in response to such request, the individual may submit an appeal of that decision to the Director of National Intelligence, in accordance with the Security Executive Agent Directive 9, Appellate Review of Retaliation Regarding Security Clearances and Access Determinations, or to the Inspector General of the Intelligence Community, in accordance with Intelligence Community Directive 120, Intelligence Community Whistleblower Protection.

(f) Following the decision to suspend an individual's DOE access authorization pursuant to paragraph (c)(1) of this section, the Manager shall immediately notify the Director in writing of the action and the reason(s) therefor. In addition, the Manager, within 10 calendar days of the date of suspension (unless an extension of time is approved by the Director), shall notify the Director in writing of their proposal to conduct an administrative review proceeding, accompanied by an explanation of its basis and a duplicate Personnel Security File.

(g) Upon receipt of the Manager's notification, the Director shall review the matter and confer with the Manager on:

(1) The institution of administrative review procedures set forth in §§ 710.20 through 710.30; or

(2) The reinstatement of access authorization; or

(3) Other actions as the Director deems appropriate.

(h) The Director shall act pursuant to one of these options within 30 calendar days of the receipt of the Manager's notification unless an extension is granted by the Deputy Director for Security, Office of Environment, Health, Safety and Security.

[81 FR 71335, Oct. 17, 2016, as amended at 88 FR 41292, June 26, 2023; 89 FR 59596, July 23, 2024]

Subpart C Administrative Review

§ 710.20 Purpose of administrative review.

These procedures govern the conduct of the administrative review of questions concerning an individual's eligibility for access authorization when it is determined that such questions cannot be favorably resolved by consultation or other action.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59596, July 23, 2024]

§ 710.21 Notice to the individual.

(a) Unless an extension is authorized in writing by the Director, within 30 calendar days of receipt of authority to institute administrative review procedures, the Manager shall prepare and deliver to the individual a notification letter approved by the local Office of Chief Counsel, or the Office of the General Counsel for Headquarters cases. Where practicable, the letter shall be delivered to the individual in person.

(b) The letter shall state:

(1) That reliable information in the possession of DOE has created a substantial doubt concerning the individual's eligibility for access authorization.

(2) The information which creates a substantial doubt regarding the individual's access authorization eligibility (which shall be as comprehensive and detailed as the national security permits) and why that information creates such doubt.

(3) That the individual has the option to have the substantial doubt regarding eligibility for access authorization resolved in one of two ways:

(i) By the Manager, without a hearing, on the basis of the existing information in the case; or

(ii) By personal appearance before an Administrative Judge (a “hearing”).

(4) That, if the individual desires a hearing, the individual must, within 20 calendar days of the date of receipt of the notification letter, make a written request for a hearing to the Manager from whom the letter was received.

(5) That the individual may also file with the Manager the individual's written answer to the reported information which raises the question of the individual's eligibility for access authorization, and that, if the individual requests a hearing without filing a written answer, the request shall be deemed a general denial of all of the reported information.

(6) That, if the individual so requests, a hearing shall be scheduled before an Administrative Judge, with due regard for the convenience and necessity of the parties or their representatives, for the purpose of affording the individual an opportunity of supporting his eligibility for access authorization. The Administrative Judge shall decide whether the hearing will be conducted via video teleconferencing.

(7) That, if a hearing is requested, the individual will have the right to appear personally before an Administrative Judge or, at the discretion of the Administrative Judge, via video teleconferencing; to present evidence in their own behalf, through witnesses, or by documents, or both; and, subject to the limitations set forth in § 710.26(g), to be present during the entire hearing and be accompanied, represented, and advised by counsel or other representative of the individual's choosing and at the individual's own expense at every stage of the proceedings. Such representative or counsel, if applicable, shall be identified in writing to the Administrative Judge and DOE Counsel and authorized by the individual to receive all correspondence, transcripts and other documents pertaining to the proceedings under this part.

(8) That the individual's failure to file a timely written request for a hearing before an Administrative Judge in accordance with paragraph (b)(4) of this section, unless time deadlines are extended for good cause, shall be considered as a relinquishment by the individual of the right to a hearing provided in this part, and that in such event a final decision to deny or revoke the individual's access authorization shall be made by the Manager.

(9) That in any proceedings under this subpart DOE Counsel will participate on behalf of and representing DOE and that any statements made by the individual to DOE Counsel may be used in subsequent proceedings;

(10) The individual's access authorization status until further notice;

(11) The name and telephone number of the designated DOE official to contact for any further information desired concerning the proceedings, including an explanation of the individual's rights under the Freedom of Information Act and Privacy Act;

(12) If applicable, that if the individual is currently the subject of criminal charges for a felony offense or an offense punishable by imprisonment of one year or more, the individual must elect either to continue with the Administrative Review process and have the substantial doubt regarding eligibility for access authorization resolved by the Manager or by a hearing, or to withdraw from the Administrative Review process.

(i) If the individual elects to continue with the Administrative Review process a determination as to the individual's access authorization shall be made by the Manager or by an Administrative Judge via a hearing. The individual will be expected to participate fully in the process. Any refusal to cooperate, answer all questions, or provide requested information may prevent DOE from reaching an affirmative finding required for granting or continuing access authorization.

(ii) If the individual elects to withdraw from the Administrative Review process, the individual's access authorization shall be administratively withdrawn. Such action shall be taken in accordance with applicable procedures set forth in pertinent Departmental directives. Any future requests for access authorization for the individual must be accompanied by documentary evidence of resolution of the criminal charges.

(iii) The individual must, within 20 calendar days of receipt of the notification letter, indicate in writing their decision to continue or to withdraw from the Administrative Review process. Such notification must be made to the Manager from whom the notification letter was received.

(c) The notification letter referenced in paragraph (b) of this section shall also:

(1) Include a copy of this part and SEAD 4, National Security Adjudicative Guidelines, or successor directive; and

(2) Indicate that if the individual believes that the action to process the individual under this part was taken as retaliation against the individual for having made a protected disclosure, as defined in Presidential Policy Directive 19, Protecting Whistleblowers with Access to Classified Information, or any successor directive issued under the authority of the President, the individual may submit a request for review of this matter directly to the DOE Office of the Inspector General. Such a request shall have no impact upon the continued processing of the individual's access authorization eligibility under this part. If the individual receives an adverse final agency determination in response to such request, the individual may submit an appeal of that decision to the Director of National Intelligence, in accordance with the SEAD 9, Appellate Review of Retaliation Regarding Security Clearances and Access Determinations, or to the Inspector General of the Intelligence Community, in accordance with Intelligence Community Directive 120, Intelligence Community Whistleblower Protection.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59596, July 23, 2024]

§ 710.22 Initial decision process.

(a) The Manager shall make an initial decision as to the individual's access authorization eligibility based on the existing information in the case if:

(1) The individual fails to respond to the notification letter by filing a timely written request for a hearing before an Administrative Judge or fails to respond to the notification letter after requesting an extension of time to do so;

(2) The individual's response to the notification letter does not request a hearing before an Administrative Judge; or

(3) The Administrative Judge refers the individual's case to the Manager in accordance with § 710.25(e) or § 710.26(b).

(b) Unless an extension of time is granted by the Director, the Manager's initial decision as to the individual's access authorization eligibility shall be made within 15 calendar days of the date of receipt of the information in paragraph (a) of this section. The Manager shall either grant or deny, or reinstate or revoke, the individual's access authorization.

(c) A letter reflecting the Manager's initial decision shall be signed by the Manager and delivered to the individual within 15 calendar days of the date of the Manager's decision unless an extension of time is granted by the Director. If the Manager's initial decision is unfavorable to the individual, the individual shall be advised:

(1) Of the Manager's unfavorable decision and the reason(s) therefor;

(2) That within 30 calendar days from the date of receipt of the letter, the individual may file a written request for a review of the Manager's initial decision, through the Director, to the DOE Headquarters Appeal Panel (Appeal Panel);

(3) That the Director may, for good cause shown, at the written request of the individual, extend the time for filing a written request for a review of the case by the Appeal Panel; and

(4) That if the written request for a review of the Manager's initial decision by the Appeal Panel is not filed within 30 calendar days of the individual's receipt of the Manager's letter, or by the date to which the Director has granted an extension, the Manager's initial decision in the case shall be final and not subject to further review or appeal.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59596, July 23, 2024]

§ 710.23 Extensions of time by the manager.

The Manager may, for good cause shown, at the written request of the individual, extend the time for filing a written request for a hearing, and/or the time for filing a written answer to the matters contained in the notification letter. The Manager shall notify the Director, in writing, when such extensions have been approved.

§ 710.24 Appointment of DOE Counsel.

(a) Upon receipt from the individual of a written request for a hearing, a DOE attorney shall forthwith be assigned by the Manager to act as DOE Counsel.

(b) DOE Counsel is authorized to consult directly with the individual if he/she is not represented by counsel, or with the individual's counsel or other representative if so represented, to clarify issues and reach stipulations with respect to testimony and contents of documents and physical evidence. Such stipulations shall be binding upon the individual and the DOE Counsel for the purposes of this part.

§ 710.25 Appointment of Administrative Judge; prehearing conference; commencement of hearings.

(a) Upon receipt of a request for a hearing, the Manager shall in a timely manner transmit that request to the Office of Hearings and Appeals, and identify the DOE Counsel. The Manager shall at the same time transmit a copy of the notification letter and the individual's response to the Office of Hearings and Appeals.

(b) Upon receipt of the hearing request from the Manager, the Director, Office of Hearings and Appeals, shall appoint, as soon as practicable, an Administrative Judge.

(c) Immediately upon appointment, the Administrative Judge shall notify the individual and DOE Counsel of their identity and the address to which all further correspondence should be sent.

(d) The Administrative Judge shall have all powers necessary to regulate the conduct of proceedings under this part, including, but not limited to, establishing a list of persons to receive service of papers, issuing subpoenas for witnesses to attend the hearing or for the production of specific documents or physical evidence, administering oaths and affirmations, ruling upon motions, receiving evidence, regulating the course of the hearing, disposing of procedural requests or similar matters, and taking other actions consistent with the regulations in this part. Requests for subpoenas shall be liberally granted except where the Administrative Judge finds that the issuance of subpoenas would result in evidence or testimony that is repetitious, incompetent, irrelevant, or immaterial to the issues in the case. The Administrative Judge may take sworn testimony, sequester witnesses, and control the dissemination or reproduction of any record or testimony taken pursuant to this part, including correspondence, or other relevant records or physical evidence including, but not limited to, information retained in computerized or other automated systems in possession of the subpoenaed person.

(e) The Administrative Judge shall determine the day, time, and place for the hearing and shall decide whether the hearing will be conducted via video teleconferencing. In the event the individual fails to appear at the time and place specified, without good cause shown, the record in the case shall be closed and returned to the Manager, who shall then make an initial determination regarding the eligibility of the individual for DOE access authorization in accordance with § 710.22(a)(3).

(f) At least 7 calendar days prior to the date scheduled for the hearing, the Administrative Judge shall convene a prehearing conference for the purpose of discussing stipulations and exhibits, identifying witnesses, and disposing of other appropriate matters. The conference may be conducted by telephone, video teleconference, or other means as directed by the Administrative Judge.

(g) Hearings shall commence within 60 calendar days from the date the individual's request for a hearing is received by the Office of Hearings and Appeals. Any extension of the hearing date past 60 calendar days from the date the request for a hearing is received by the Office of Hearings and Appeals shall be decided by the Director, Office of Hearings and Appeals.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59596, July 23, 2024]

§ 710.26 Conduct of hearings.

(a) In all hearings conducted under this part, the individual shall have the right to be represented by a person of their own choosing, at the individual's own expense. The individual is responsible for producing witnesses in their own behalf, including requesting the issuance of subpoenas, if necessary, or presenting testimonial, documentary, or physical evidence before the Administrative Judge to support the individual's defense to the derogatory information contained in the notification letter. With the exception of procedural or scheduling matters, the Administrative Judge is prohibited from initiating or otherwise engaging in ex parte discussions about the case during the pendency of proceedings under this part.

(b) Unless the Administrative Judge finds good cause for deferring issuance of a decision, in the event that the individual unduly delays the hearing, such as by failure to meet deadlines set by the Administrative Judge, the record shall be closed, and an initial decision shall be made by the Manager on the basis of the record in the case per § 710.22(a)(3).

(c) Hearings shall be open only to DOE Counsel, duly authorized representatives of DOE, the individual and the individual's counsel or other representatives, and such other persons as may be authorized by the Administrative Judge. Unless otherwise ordered by the Administrative Judge, witnesses shall testify in the presence of the individual but not in the presence of other witnesses.

(d) DOE Counsel shall assist the Administrative Judge in establishing a complete administrative hearing record in the proceeding and bringing out a full and true disclosure of all facts, both favorable and unfavorable, having a bearing on the issues before the Administrative Judge. The individual shall be afforded the opportunity of presenting testimonial, documentary, and physical evidence, including testimony by the individual in the individual's own behalf. All witnesses shall be subject to cross-examination, if possible.

(e) The Administrative Judge may ask the witnesses any questions which the Administrative Judge deems appropriate to assure the fullest possible disclosure of relevant and material facts.

(f) During the course of the hearing, the Administrative Judge shall rule on all objections raised.

(g) In the event it appears during the course of the hearing that classified matter may be disclosed, it shall be the duty of the Administrative Judge to assure that disclosure is not made to persons who are not authorized to receive it, and take other appropriate measures.

(h) Formal rules of evidence shall not apply, but the Federal Rules of Evidence may be used as a guide for procedures and principles designed to assure production of the most probative evidence available. The Administrative Judge shall admit into evidence any matters, either oral or written, which are material, relevant, and competent in determining issues involved, including the testimony of responsible persons concerning the integrity of the individual. In making such determinations, the utmost latitude shall be permitted with respect to relevancy, materiality, and competency. The Administrative Judge may also exclude evidence which is incompetent, immaterial, irrelevant, or unduly repetitious. Every reasonable effort shall be made to obtain the best evidence available. Subject to §§ 710.26(l), 710.26(m), 710.26(n) and 710.26(o), hearsay evidence may, at the discretion of the Administrative Judge and for good cause show, be admitted without strict adherence to technical rules of admissibility and shall be accorded such weight as the Administrative Judge deems appropriate.

(i) Testimony of the individual and witnesses shall be given under oath or affirmation. Attention of the individual and each witness shall be directed to 18 U.S.C. 1001 and 18 U.S.C. 1621.

(j) The Administrative Judge shall endeavor to obtain all the facts that are reasonably available in order to arrive at a decision. If, prior to or during the proceedings, in the opinion of the Administrative Judge, the derogatory information in the notification letter is not sufficient to address all matters into which inquiry should be directed, the Administrative Judge may recommend to the Manager concerned that, in order to give more adequate notice to the individual, the notification letter should be amended. Any amendment shall be made with the concurrence of the local Office of Chief Counsel or the Office of the General Counsel in Headquarters cases. If, in the opinion of the Administrative Judge, the circumstances of such amendment may involve undue hardship to the individual because of limited time to respond to the new derogatory information in the notification letter, an appropriate adjournment shall be granted upon the request of the individual.

(k) A written or oral statement of a person relating to the characterization in the notification letter of any organization or person other than the individual may be received and considered by the Administrative Judge without affording the individual an opportunity to cross-examine the person making the statement on matters relating to the characterization of such organization or person, provided the individual is given notice that such a statement has been received and may be considered by the Administrative Judge, and is informed of the contents of the statement, provided such notice is not prohibited by paragraph (g) of this section.

(l) Any oral or written statement adverse to the individual relating to a controverted issue may be received and considered by the Administrative Judge without affording an opportunity for cross-examination in either of the following circumstances:

(1) The head of the agency supplying the statement certifies that the person who furnished the information is a confidential informant who has been engaged in obtaining intelligence information for the Government and that disclosure of the informant's identity would be substantially harmful to the national interest;

(2) The Secretary or the Secretary's special designee for that particular purpose has preliminarily determined, after considering information furnished by the investigative agency as to the reliability of the person and the accuracy of the statement concerned, that:

(i) The statement concerned appears to be reliable and material; and

(ii) Failure of the Administrative Judge to receive and consider such statement would, in view of the access sought to classified matter or special nuclear material, be substantially harmful to the national security and that the person who furnished the information cannot appear to testify:

(A) Due to death, severe illness, or similar cause, in which case the identity of the person and the information to be considered shall be made available to the individual, or

(B) Due to some other specified cause determined by the Secretary to be good and sufficient.

(m) Whenever procedures under paragraph (l) of this section are used:

(1) The individual shall be given a summary or description of the information which shall be as comprehensive and detailed as the national interest permits, and

(2) Appropriate consideration shall be accorded to the fact that the individual did not have an opportunity to cross-examine such person(s).

(n) Records compiled in the regular course of business, or other evidence other than investigative reports obtained by DOE, may be received and considered by the Administrative Judge subject to rebuttal without authenticating witnesses, provided that such information has been furnished to DOE by an investigative agency pursuant to its responsibilities in connection with assisting the Secretary to safeguard classified matter or special nuclear material.

(o) Records compiled in the regular course of business, or other evidence other than investigative reports, relating to a controverted issue which, because they are classified, may not be inspected by the individual, may be received and considered by the Administrative Judge, provided that:

(1) The Secretary or the Secretary's special designee for that particular purpose has made a preliminary determination that such evidence appears to be material;

(2) The Secretary or the Secretary's special designee for that particular purpose has made a determination that failure to receive and consider such evidence would, in view of the access sought to classified matter or special nuclear material, be substantially harmful to the national security; and

(3) To the extent that national security permits, a summary or description of such evidence is made available to the individual. In every such case, information as to the authenticity and accuracy of such evidence furnished by the investigative agency shall be considered.

(p) The Administrative Judge may request the Local Director of Security to arrange for additional investigation on any points which are material to the deliberations of the Administrative Judge and which the Administrative Judge believes need further investigation or clarification. In this event, the Administrative Judge shall set forth in writing those issues upon which more evidence is requested, identifying where possible persons or sources from which the evidence should be sought. The Local Director of Security shall make every effort through appropriate sources to obtain additional information upon the matters indicated by the Administrative Judge.

(q) A written transcript of the entire hearing shall be made and, except for portions containing classified matter, a copy of such transcript shall be furnished to the individual without cost.

(r) Whenever information is made a part of the record under the exceptions authorized by paragraphs (l) or (o) of this section, the record shall contain certificates evidencing that the determinations required therein have been made.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59597, July 23, 2024]

§ 710.27 Administrative Judge's decision.

(a) The Administrative Judge shall carefully consider the entire record of the proceeding and shall render a decision, within 30 calendar days of the receipt of the hearing transcript, as to whether granting or restoring the individual's access authorization would not endanger the common defense and security and would be clearly consistent with the national interest. In resolving a question concerning the eligibility of an individual for access authorization under these procedures, the Administrative Judge shall consider the factors stated in § 710.7(c) to determine whether the findings will be favorable or unfavorable.

(b) In reaching the findings, the Administrative Judge shall consider the demeanor of the witnesses who have testified at the hearing, the probability or likelihood of the truth of their testimony, their credibility, and the authenticity and accuracy of documentary evidence, or lack of evidence on any material points in issue. If the individual is, or may be, prejudiced by the non-disclosure to the individual of undisclosed information or by lack of opportunity to cross-examine confidential informants, the Administrative Judge shall take that fact into consideration. The possible adverse impact of the loss of the individual's access authorization upon the DOE program in which the individual works shall not be considered by the Administrative Judge.

(c) The Administrative Judge shall make specific findings based upon the record as to the validity of each instance of derogatory information contained in the notification letter and the significance which the Administrative Judge attaches to it. These findings shall be supported fully by a statement of reasons which constitute the basis for such findings.

(d) The Administrative Judge's decision shall be based on the Administrative Judge's findings of fact. If, after considering all of the factors set forth in § 710.7(c) in light of the Adjudicative Guidelines, the Administrative Judge is of the opinion that it will not endanger the common defense and security and will be clearly consistent with the national interest to grant or reinstate access authorization for the individual, the Administrative Judge shall render a favorable decision; otherwise, the Administrative Judge shall render an unfavorable decision. Within 15 calendar days of the Administrative Judge's written decision, the Administrative Judge shall provide copies of the decision and the administrative record to the Manager and the Director.

[81 FR 71335, Oct. 17, 2016, as amended at 89 FR 59597, July 23, 2024]

§ 710.28 Action on the Administrative Judge's decision.

(a) Within 10 calendar days of receipt of the decision and the administrative record, unless an extension of time is granted by the Director, the Manager shall:

(1) Notify the individual in writing of the Administrative Judge's decision;

(2) Advise the individual in writing of the appeal procedures available to the individual in paragraph (b) of this section if the decision is unfavorable to the individual;

(3) Advise the individual in writing of the appeal procedures available to the Manager and the Director in paragraph (c) of this section if the decision is favorable to the individual; and

(4) Provide the individual and/or their counsel or other representative a copy of the Administrative Judge's decision and the administrative record.

(b) If the Administrative Judge's decision is unfavorable to the individual:

(1) The individual may file with the Director a written request for further review of the decision by the Appeal Panel along with a statement required by paragraph (e) of this section within 30 calendar days of the individual's receipt of the Manager's notice;

(2) The Director may, for good cause shown, extend the time for filing a request for further review of the decision by the Appeal Panel at the written request of the individual, provided the request for an extension of time is filed by the individual within 30 calendar days of receipt of the Manager's notice;

(3) The Administrative Judge's decision shall be final and not subject to review or appeal if the individual does not:

(i) File a written request for a review of the decision by the Appeal Panel or for an extension of time to file a written request for review of the decision by the Appeal Panel in accordance with paragraphs (b)(1) or (b)(2) of this section, or

(ii) File a written request for review of the decision by the Appeal Panel after having been granted an extension of time to do so.

(c) If the Administrative Judge's decision is favorable to the individual:

(1) The Manager, with the concurrence of the Director, shall grant or reinstate the individual's access authorization within 30 calendar days of the Administrative Judge's decision becoming final, or

(2) The Manager or the Director may file a written request with the Deputy Director for Security, Office of Environment, Health, Safety and Security for review of the decision by the Appeal Panel, along with statement required by paragraph (e) of this section, within 30 calendar days of the individual's receipt of the Manager's notice.

(3) The Deputy Director for Security, Office of Environment, Health, Safety and Security may, for good cause shown, extend the time for filing a request for review of the decision by the Appeal Panel at the request of the Manager or Director, provided the request for an extension of time is filed by the Manager or Director within 30 calendar days of the receipt of the Manager's notice;

(4) The Administrative Judge's decision shall constitute final action, and not be subject to review or appeal, if the Manager or Director does not:

(i) File a written request for review of the decision by the Appeal Panel or for an extension of time to file a written request for review of the decision by the Appeal Panel in accordance with paragraphs (c)(2) or (c)(3) of this section, or

(ii) File a written request for a review of the decision by the Appeal Panel after having been granted an extension of time to do so.

(d) A copy of any request for review of the individual's case by the Appeal Panel filed by the Manager or the Director shall be provided to the individual by the Manager.

(e) The party filing a request for review by the Appeal Panel shall include with the request a statement identifying the issues upon which the appeal is based. A copy of the request and statement shall be served on the other party, who may file a response with the Appeal Panel within 20 calendar days of receipt of the statement.

[81 FR 71335, Oct. 17, 2016, as amended at 88 FR 41292, June 26, 2023; 89 FR 59597, July 23, 2024]

§ 710.29 Final appeal process.

(a) The Appeal Panel shall be convened by the Deputy Director for Security, Office of Environment, Health, Safety and Security to review and render a final decision in access authorization eligibility cases referred by the individual, the Manager, or the Director in accordance with §§ 710.22 or 710.28.

(b) The Appeal Panel shall consist of three members, each of whom shall be a DOE Headquarters employee, a United States citizen, and hold a DOE Q access authorization. The Deputy Director for Security, Office of Environment, Health, Safety and Security shall serve as a permanent member of the Appeal Panel and as the Appeal Panel Chair. The second member of the Appeal Panel shall be a DOE attorney designated by the General Counsel. The head of the DOE Headquarters element which has cognizance over the individual whose access authorization eligibility is being considered may designate an employee to act as the third member on the Appeal Panel; otherwise, the third member shall be designated by the Chair. Only one member of the Appeal Panel shall be from the security field.

(c) In filing a written request for a review by the Appeal Panel in accordance with §§ 710.22 and 710.28, the individual, or their counsel or other representative, shall identify the issues upon which the appeal is based. The written request, and any response, shall be made a part of the administrative record. The Director shall provide staff support to the Appeal Panel as requested by the Chair.

(d) Within 15 calendar days of the receipt of the request for review of a case by the Appeal Panel, the Chair shall arrange for the Appeal Panel members to convene and review the administrative record or provide a copy of the administrative record to the Appeal Panel members for their independent review.

(e) The Appeal Panel shall consider only that evidence and information in the administrative record at the time of the Manager's or the Administrative Judge's initial decision.

(f) Within 45 calendar days of receipt of the administrative record, the Appeal Panel shall render a final decision in the case. If a majority of the Appeal Panel members determine that it will not endanger the common defense and security and will be clearly consistent with the national interest, the Chair shall grant or reinstate the individual's access authorization; otherwise, the Chair shall deny or revoke the individual's access authorization. The Appeal Panel's written decision shall be made a part of the administrative record and is not subject to further review or appeal.

(g) The Chair, through the Director, shall inform the individual in writing, as well as the individual's counsel or other representative, of the Appeal Panel's final decision. A copy of the correspondence shall also be provided to the other panel members and the Manager.

[81 FR 71335, Oct. 17, 2016, as amended at 88 FR 41292, June 26, 2023; 89 FR 59597, July 23, 2024]

§ 710.30 Action by the Secretary.

(a) Whenever an individual has not been afforded an opportunity to cross-examine witnesses who have furnished information adverse to the individual under the provisions of §§ 710.26(l) or (o), the Secretary may issue a final decision to deny or revoke access authorization for the individual after personally reviewing the administrative record and any additional material provided by the Chair. The Secretary's authority may, in accordance with applicable provisions of Executive Order 12968, be delegated to the Deputy Secretary where the effected individual is a Federal employee. The Secretary's authority, in accordance with applicable provisions of Executive Order 10865, may not be delegated where the effected individual is a contractor employee. This authority may be exercised only when the Secretary determines that the circumstances described in § 710.26(l) or (o) are present, and such determination shall be final and not subject to review or appeal.

(b) Whenever the Secretary issues a final decision as to an individual's access authorization eligibility, the individual and other concerned parties shall be notified in writing by the Chair of that decision and of the Secretary's findings with respect to each instance of derogatory information contained in the notification letter and each substantial issue identified in the statement in support of the request for review to the extent allowed by the national security.

(c) Nothing contained in these procedures shall be deemed to limit or affect the responsibility and powers of the Secretary to issue subpoenas or to deny or revoke access to classified matter or special nuclear material.

§ 710.31 Reconsideration of access eligibility.

(a) If, pursuant to the procedures set forth in §§ 710.20 through 710.30, the Manager, Administrative Judge, Appeal Panel, or the Secretary has made a decision granting or reinstating an individual's access authorization, eligibility shall be reconsidered as a new administrative review under the procedures set forth in this part when previously unconsidered derogatory information is identified, or the individual violates a commitment upon which the DOE previously relied to favorably resolve an issue of access authorization eligibility.

(b) If, pursuant to the procedures set forth in §§ 710.20 through 710.31, the Manager, Administrative Judge, Appeal Panel, or the Secretary has made a decision denying or revoking the individual's access authorization, eligibility may be reconsidered only when the individual so requests in writing, when there is a bona fide offer of employment requiring access authorization, and when there is either material and relevant new evidence which the individual and the individual's representatives were without fault in failing to present earlier, or convincing evidence of rehabilitation or reformation.

(1) A request for reconsideration shall be accepted when a minimum of one year has elapsed since the date of the Manager's, Administrative Judge's, Appeal Panel's or Secretary's final decision, or of a previous denial of reconsideration. Requests must be submitted in writing to the Deputy Director for Security, Office of Environment, Health, Safety and Security, and must include an affidavit setting forth in detail the new evidence or evidence of rehabilitation or reformation.

(2) If the Deputy Director for Security, Office of Environment, Health, Safety and Security approves the request for reconsideration of an individual's access authorization eligibility, he/she shall so notify the individual, and shall direct the Manager to take appropriate actions to determine whether the individual is eligible for access authorization.

(3) If the Deputy Director for Security, Office of Environment, Health, Safety and Security denies the request for reconsideration of an individual's access authorization eligibility, he/she shall so notify the individual in writing. Such a denial is final and not subject to review or appeal.

(4) If, pursuant to the provisions of paragraph (b)(2) of this section, the Manager determines the individual is eligible for access authorization, the Manager shall grant access authorization.

(5) If, pursuant to the provisions of paragraph (b)(2) of this section, the Manager determines the individual remains ineligible for access authorization, the Manager shall so notify the Director in writing. If the Director concurs, the Director shall notify the individual in writing. This decision is final and not subject to review or appeal. If the Director does not concur, the Director shall confer with the Manager on further actions.

(6) Determinations as to eligibility for access authorization pursuant to paragraph (b)(4) or (5) of this section may be based solely upon the mitigation of derogatory information which was relied upon in a final decision to deny or to revoke access authorization. If, pursuant to the procedures set forth in paragraph (b)(2) of this section, previously unconsidered derogatory information is identified, a determination as to eligibility for access authorization must be subject to a new Administrative Review proceeding.

[81 FR 71335, Oct. 17, 2016, as amended at 88 FR 41292, June 26, 2023; 89 FR 59597, July 23, 2024]

Subpart D Miscellaneous

§ 710.32 Terminations.

(a) If the individual is no longer an applicant for access authorization or no longer requires access authorization, the procedures of this part shall be terminated without a final decision as to the individual's access authorization eligibility, unless a final decision has been rendered prior to the DOE being notified of the change in the individual's pending access authorization status. Where the procedures of this part have been terminated pursuant to this paragraph after an unfavorable initial agency decision as to the individual's access authorization eligibility has been rendered, any subsequent request for access authorization for the individual will be processed as a request for a review of the initial agency decision by the Appeal Panel and a final agency decision will be rendered pursuant to § 710.29, unless a minimum of one year has elapsed since the date of the initial agency decision.

(b) With regard to applicants (individuals for whom DOE has not yet approved access authorization), DOE may administratively terminate processing an application for access authorization under the following circumstances:

(1) If the applicant is currently the subject of criminal proceedings for a felony offense or an offense that is punishable by a term of imprisonment of one year or longer, or is awaiting or serving a form of probation, suspended or deferred sentencing, or parole. Once all judicial proceedings on the criminal charges have been finally resolved, and the term (if any) of imprisonment, probation, or parole has been completed, DOE processing of a request for access authorization shall resume upon receipt by DOE of a written request therefor, provided that the individual has a bona fide offer of employment requiring access authorization.

(2) If sufficient information about the individual's background cannot be obtained to meet the investigative scope and extent requirements for the access authorization requested.

(c) If an individual believes that the provisions of paragraph (b) of this section have been inappropriately applied, a written appeal may be filed with the Director within 30 calendar days of the date the individual was notified of the action. The Director shall act on the written appeal as described in § 710.6(c).

§ 710.33 Time frames.

Statements of time established for processing aspects of a case under this part are the agency's desired time frames in implementing the procedures set forth in this part. However, failure to meet the time frames shall have no impact upon the final disposition of an access authorization by a Manager, Administrative Judge, the Appeal Panel, or the Secretary, and shall confer no procedural or substantive rights upon an individual whose access authorization eligibility is being considered.

§ 710.34 Acting officials.

Except for the Secretary, the responsibilities and authorities conferred in this part may be exercised by persons who have been designated in writing as acting for, or in the temporary capacity of, the following DOE positions: The Local Director of Security; the Manager; the Director, or the General Counsel. The responsibilities and authorities of the Deputy Director for Security, Office of Environment, Health, Safety and Security may be exercised by persons in senior security-related positions within the Office of Environment, Health, Safety and Security who have been designated in writing as acting for, or in the temporary capacity of, the Deputy Director for Security, Office of Environment, Health, Safety and Security, with the approval of the Director, Office of Environment, Health, Safety and Security.

[81 FR 71335, Oct. 17, 2016, as amended at 88 FR 41292, June 26, 2023]

PART 712 HUMAN RELIABILITY PROGRAM

Authority: 42 U.S.C. 2165; 42 U.S.C. 2201; 42 U.S.C. 5814-5815; 42 U.S.C. 7101 et seq.; 50 U.S.C. 2401 et seq.; E.O. 10450, 3 CFR 1949-1953 Comp., p. 936, as amended; E.O. 10865, 3 CFR 1959-1963 Comp., p. 398, as amended; 3 CFR Chap. IV.

Source: 69 FR 3223, Jan. 23, 2004, unless otherwise noted.

Editorial Note: Nomenclature changes to part 712 appear at 88 FR 41292, June 26, 2023.

Subpart A Establishment of and Procedures for the Human Reliability Program

Source: 83 FR 18200, Apr. 26, 2018, unless otherwise noted.

7 General Provisions
§ 712.1 Purpose.

This part establishes the policies and procedures for a Human Reliability Program (HRP) in the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). The HRP is a security and safety reliability program designed to ensure that individuals who occupy positions affording access to certain materials, nuclear explosive devices, facilities, and programs meet the highest standards of reliability and physical and mental suitability. This objective is accomplished under this part through a system of continuous evaluation that identifies individuals whose judgment and reliability may be impaired by physical or mental/personality disorders, alcohol abuse, use of illegal drugs or the abuse of legal drugs or other substances, or any other condition or circumstance that may be of a security or safety concern.

§ 712.2 Applicability.

The HRP applies to all applicants for, or current employees of DOE or NNSA or a DOE or NNSA contractor or subcontractor in a position defined or designated under § 712.10 of this subpart as an HRP position.

§ 712.3 Definitions.

The following definitions are used in this part:

Access means:

(1) A situation that may provide an individual proximity to or control over Category I special nuclear material (SNM); or

(2) The proximity to a nuclear explosive and/or Category I SNM that allows the opportunity to divert, steal, tamper with, and/or damage the nuclear explosive or material in spite of any controls that have been established to prevent such unauthorized actions.

Alcohol means the intoxicating agent in beverage alcohol, ethyl alcohol, or other low molecular weight alcohol.

Alcohol abuse means consumption of any beverage, mixture, or preparation, including any medication containing alcohol that results in impaired social or occupational functioning.

Alcohol concentration means the alcohol in a volume of breath expressed in terms of grams of alcohol per 210 liters of breath as indicated by a breath test.

Alcohol use disorder means a maladaptive pattern in which a person's intake of alcohol is great enough to damage or adversely affect physical or mental health or personal, social, or occupational function; or when alcohol has become a prerequisite to normal function.

Case chronology means a written recitation of all actions that support a recommendation to revoke an individual's HRP certification under § 712.19.

Certification means the formal action the HRP certifying official takes that permits an individual to perform HRP duties after it is determined that the individual meets the requirements for certification under this part.

Contractor means contractors and subcontractors at all tiers and any industrial, educational, commercial, or other entity, grantee, or licensee, including an employee that has executed an agreement with the Federal government for the purpose of performing under a contract, license, or other arrangement.

Designated Physician means a licensed doctor of medicine or osteopathy who has been nominated by the Site Occupational Medical Director (SOMD) and approved by the Manager or designee, with the concurrence of the Director, Office of Environment, Health, Safety and Security or his or her designee to provide professional expertise in occupational medicine for the HRP.

Designated Psychologist means a licensed Ph.D., or Psy.D., in clinical psychology who has been nominated by the SOMD and approved by the Manager or designee, with the concurrence of the Director, Office of Environment, Health, Safety and Security or his or her designee to provide professional expertise in the area of psychological assessment for the HRP.

Diagnostic and Statistical Manual of Mental Disorders means the current version of the American Psychiatric Association's manual containing definitions of psychiatric terms and diagnostic criteria of mental disorders.

Director, Office of Environment, Health, Safety and Security means the DOE individual with responsibility for policy and quality assurance for DOE occupational medical programs.

Drug abuse means use of an illegal drug or misuse of legal drugs.

Evaluative report means the document that sets forth the bases supporting the revocation of an individual's certification.

Evidential-grade breath alcohol device means a device that conforms to the model standards for an evidential breath-testing device as listed on the Conforming Products List of Evidential Breath Measurement Devices published by the National Highway Traffic Safety Administration (NHTSA).

Flashback means an involuntary, spontaneous recurrence of some aspect of a hallucinatory experience or perceptual distortion that occurs long after taking the hallucinogen that produced the original effect; also referred to as hallucinogen persisting perception disorder.

Hallucinogen means a drug or substance that produces hallucinations, distortions in perception of sights and sounds, and disturbances in emotion, judgment, and memory.

HRP candidate means an individual being considered for assignment to an HRP position.

HRP-certified individual means an individual who has successfully completed the HRP requirements.

HRP certifying official means the Manager or the Manager's designee who certifies, recertifies, temporarily removes, reviews the circumstances of an individual's removal from an HRP position, and directs reinstatement.

HRP management official means an individual designated by the DOE or a DOE contractor, as appropriate, who has programmatic responsibility for HRP positions.

Illegal drug means a controlled substance, as specified in Schedules I through V of the Controlled Substances Act, 21 U.S.C. 811 and 812; the term does not apply to the use of a controlled substance in accordance with the terms of a valid prescription, or other uses authorized by Federal law.

Impaired or impairment means a decrease in functional capacity of a person that is caused by a physical, mental, emotional, substance abuse, or behavioral disorder.

Incident means an unplanned, undesired event that interrupts the completion of an activity and that may include property damage or injury.

Job task analysis means the formal process of defining the requirements of a position and identifying the knowledge, skills, and abilities necessary to effectively perform the duties of the position.

Manager means the senior Federal line manager at a departmental site or Federal office with HRP-designated positions.

Material access area means a type of Security Area that is authorized to contain a Category I quantity of special nuclear material and that has specifically defined physical barriers, is located within a Protected Area, and is subject to specific access controls.

Medical assessment means an evaluation of an HRP candidate and HRP-certified individual's present health status and health risk factors by means of:

(1) Medical history review;

(2) Job task analysis;

(3) Physical examination;

(4) Appropriate laboratory tests and measurements; and

(5) Appropriate psychological and psychiatric evaluations.

Nuclear explosive means an assembly of fissionable and/or fusionable materials and main charge high explosive parts or propellants that is capable of producing a nuclear detonation.

Nuclear explosive duties means work assignments that allow custody of a nuclear explosive or access to a nuclear explosive device or area.

Occurrence means any event or incident that is a deviation from the planned or expected behavior or course of events in connection with any DOE or DOE-controlled operation if the deviation has environmental, public health and safety, or national security protection significance, including (but not limited to) incidents involving:

(1) Injury or fatality to any person involving actions of a DOE employee or contractor employee;

(2) An explosion, fire, spread of radioactive material, personal injury or death, or damage to property that involves nuclear explosives under DOE jurisdiction;

(3) Accidental release of pollutants that results from, or could result in, a significant effect on the public or environment; or

(4) Accidental release of radioactive material above regulatory limits.

Psychological assessment or test means a scientifically validated instrument designed to detect psychiatric, personality, and behavioral tendencies that would indicate problems with reliability and judgment.

Random alcohol testing means the unscheduled, unannounced alcohol testing of randomly selected employees by a process designed to ensure that selections are made in a nondiscriminatory manner.

Random drug testing means the unscheduled, unannounced drug testing of randomly selected employees by a process designed to ensure that selections are made in a nondiscriminatory manner.

Reasonable suspicion means a suspicion based on an articulable belief that an individual uses illegal drugs or is under the influence of alcohol, drawn from reasonable inferences from particular facts, as detailed further in part 707 of this title.

Recertification means the action the HRP certifying official takes annually, not to exceed 12 months, that permits an employee to remain in the HRP and perform HRP duties.

Reinstatement means the action taken after it has been determined that an employee who has been temporarily removed from the HRP meets the certification requirements of this part and can be returned to HRP duties, contingent on the individual completing any and all components of the annual recertification process under § 712.11 and any other specific requirements that must be completed in order to return to full HRP duties.

Reliability means an individual's ability to adhere to security and safety rules and regulations.

Restoration means the actions necessary to restore an individual's HRP duties after a final decision has been made by the cognizant Under Secretary or his/her designee to overturn the revocation decision. The restoration of HRP duties is contingent on the individual completing any and all components of the annual recertification process under § 712.11 and any other specific requirements that must be completed in order to return to full HRP duties.

Safety concern means any condition, practice, or violation that causes a reasonable probability of physical harm, property loss, and/or environmental impact.

Security concern means the presence of information regarding an individual that raises a question as to whether HRP certification and recertification would endanger the common defense and security and would be clearly consistent with the national interest.

Semi-structured interview means an interview by a Designated Psychologist, or a psychologist under his or her supervision, who has the latitude to vary the focus and content of the questions depending on the interviewee's responses.

Site Occupational Medical Director (SOMD) means the physician responsible for the overall direction and operation of the occupational medical program at a particular site or program.

Supervisor means the individual who has oversight and organizational responsibility for a person holding an HRP position, and whose duties include evaluating the behavior and performance of the HRP-certified individual.

Transfer means an HRP-certified individual moving from one site to another site.

Unacceptable damage means an incident that could result in a nuclear detonation; high-explosive detonation or deflagration from a nuclear explosive; the diversion, misuse, or removal of Category I special nuclear material; or an interruption of nuclear explosive operations with a significant impact on national security.

Unsafe practice means either a human action departing from prescribed hazard controls or job procedures or practices, or an action causing a person unnecessary exposure to a hazard.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

§ 712.4 Exemptions.

The Department is authorized to grant exemptions from the requirements in § 712.11 of this part as it determines are authorized by law. Exemptions from requirements in this part are allowed only on a case-by-case basis. All requests for an exemption should be submitted in writing from the Manager to the Director, Office of Environment, Health, Safety and Security for coordination, and approval by the cognizant Under Secretary. A request for an exemption shall be approved only if the cognizant Under Secretary determines that the exemption will not endanger life or property or the common defense and security, and is otherwise consistent with the national interest. The procedures in this section shall not be used to establish stricter recertification standards than those required by § 712.11.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

8 Procedures
§ 712.10 Designation of HRP positions.

(a) HRP certification is required for each individual assigned to, or applying for, a position that:

(1) Affords access to Category I SNM or has responsibility for transportation or protection of Category I quantities of SNM;

(2) Involves nuclear explosive duties or has responsibility for working with, protecting, or transporting nuclear explosives, nuclear devices, or selected components;

(3) Affords access to information concerning vulnerabilities in protective systems when transporting nuclear explosives, nuclear devices, selected components, or Category I quantities of SNM; or

(4) Is not included in paragraphs (a)(1) through (3) of this section but affords the potential to significantly impact national security or cause unacceptable damage and is approved pursuant to paragraph (b) of this section.

(b) The Manager or the HRP management official may nominate positions for the HRP that are not specified in paragraphs (a)(1) through (3) of this section or that have not previously been designated HRP positions. All such nominations must be submitted to and approved by either the NNSA Administrator, his or her designee, the Director, Office of Environment, Health, Safety and Security or the appropriate Lead Program Secretarial Officer, or his or her designee.

(c) Before nominating a position for designation as an HRP position, the Manager or the HRP management official must analyze the risks the position poses for the particular operational program. If the analysis shows that more restrictive physical, administrative, or other controls could be implemented that would prevent the position from being designated an HRP position, those controls will be implemented, if practicable.

(d) Nothing in this part prohibits contractors from establishing stricter employment standards for individuals who are nominated to DOE for certification or recertification in the HRP.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

§ 712.11 General requirements for HRP certification.

(a) The following requirements apply to each individual applying for or in an HRP position:

(1) A DOE “Q” access authorization;

(2) Signed releases, acknowledgments, and waivers to participate in the HRP on forms provided by DOE;

(3) Completion of initial and annual HRP instruction as provided in § 712.17;

(4) Successful completion of an initial and annual supervisory review, medical assessment, management evaluation, and a DOE personnel security review;

(5) No use of any hallucinogen in the preceding 5 years and no experience of flashback resulting from the use of any hallucinogen more than 5 years before applying for certification or recertification;

(6) An initial drug test and random drug tests for the use of illegal drugs at least once each 12 months;

(7) An initial alcohol test and random alcohol tests at least once each 12 months; and

(8) For designated positions, identified pursuant to 10 CFR part 709, successful completion of a counterintelligence evaluation, which may include a counterintelligence-scope polygraph examination in accordance with DOE's Polygraph Examination Regulation, 10 CFR part 709, and any subsequent revisions to that regulation.

(b) Each HRP candidate must be certified in the HRP before being assigned to HRP duties and must be recertified annually, not to exceed 12 months between recertifications.

(c) Individuals in newly identified HRP positions must immediately sign the releases, acknowledgments, and waivers to participate in the HRP and complete initial instruction on the importance of security, safety, reliability, and suitability. If these requirements are not met, the individual must be removed from the HRP position. All remaining HRP requirements listed in paragraph (a) of this section must be completed in an expedited manner.

(d) Alcohol consumption is prohibited within an eight-hour period preceding scheduled work for individuals performing nuclear explosive duties and for individuals in specific positions designated by either the Manager, the NNSA Administrator, his or her designee, or the appropriate Lead Program Secretarial Officer, or his or her designee.

(e) Individuals reporting for unscheduled nuclear explosive duties and those specific positions designated by either the Manager, the NNSA Administrator or his or her designee, or the appropriate Lead Program Secretarial Officer, or his or her designee, will be asked prior to performing any type of work if they have consumed alcohol within the preceding eight-hour period. If they answer “no,” they may perform their assigned duties but still may be tested.

(f) Any doubt as to an HRP candidate's or HRP certified individual's eligibility for certification shall be resolved against the candidate or individual in favor of national security and/or safety.

§ 712.12 HRP implementation.

(a) The implementation of the HRP is the responsibility of the appropriate Manager or his or her designee.

(b) The HRP Management Official must prepare an HRP implementation plan and submit it to the applicable Manager for review and approval. The implementation plan must:

(1) Be reviewed and updated every 2 years;

(2) Include the four annual components of the HRP process: supervisory review, medical assessment, management evaluation (which includes random drug and alcohol testing), and a DOE personnel security determination; and

(3) Include the HRP instruction and education component described in § 712.17 of this part.

(c) The Under Secretary for Nuclear Security, or his/her designee, must:

(1) Provide advice and assistance to the Director, Office of Environment, Health, Safety and Security regarding policies, standards, and guidance for all nuclear explosive duty requirements; and

(2) Be responsible for implementation of all nuclear explosive duty safety requirements.

(d) The Director, Office of Environment, Health, Safety and Security, or designee, is responsible for HRP policy and must:

(1) Ensure consistency of the HRP throughout the DOE and NNSA;

(2) Review and comment on all HRP implementation plans to ensure consistency with policy; and

(3) Provide policies and guidance, including instructional materials, to NNSA and non-NNSA field elements concerning the HRP, as appropriate.

(e) The Manager must:

(1) Review and approve the HRP implementation plan for sites/facilities under their cognizance and forward the plan to the Director, Office of Corporate Security Strategy, or designee; and

(2) Ensure that the HRP is implemented at the sites/facilities under their cognizance.

(f) The HRP certifying official must:

(1) Approve placement, certification, reinstatement, and recertification of individuals into HRP positions; for unresolved temporary removals, follow the process in § 712.19(f);

(2) Ensure that instructional requirements are implemented;

(3) Immediately notify (for the purpose of limiting access) the appropriate HRP management official of a personnel security action that results in the suspension of access authorization; and

(4) Ensure that the supervisory review, medical assessment, and management evaluation, including drug and alcohol testing, are conducted on an annual basis (not to exceed 12 months).

(g) Individuals assigned to HRP duties must:

(1) Execute HRP releases, acknowledgments, and waivers to facilitate the collection and dissemination of information, the performance of drug and alcohol testing, and medical examinations;

(2) Notify the Designated Physician, the Designated Psychologist, or the SOMD immediately of a physical or mental condition requiring medication or treatment;

(3) Report any observed or reported behavior or condition of another HRP-certified individual that could indicate a reliability concern, including those behaviors and conditions listed in § 712.13(c), to a supervisor, the Designated Physician, the Designated Psychologist, the SOMD, or the HRP management official; and

(4) Report to a supervisor, the Designated Physician, the Designated Psychologist, the SOMD, or the HRP management official, any behavior or condition, including those listed in § 712.13(c), that may affect his or her ability to perform HRP duties.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

§ 712.13 Supervisory review.

(a) The supervisor must ensure that each HRP candidate and each individual occupying an HRP position but not yet HRP certified executes the appropriate HRP releases, acknowledgments, and waivers. If these documents are not executed:

(1) The request for HRP certification may not be further processed until these requirements are completed; and

(2) The individual is immediately removed from the position.

(b) Each supervisor of HRP-certified personnel must conduct an annual review of each HRP-certified individual during which the supervisor must evaluate information, based on his or her personal knowledge that is relevant to the individual's suitability to perform HRP tasks in a reliable and safe manner.

(c) The supervisor must report any concerns resulting from his or her review to the appropriate HRP management official. Types of behavior and conditions that would indicate a concern include, but are not limited to:

(1) Psychological or physical disorders that impair performance of assigned duties;

(2) Conduct that warrants referral for a criminal investigation or results in arrest or conviction;

(3) Indications of deceitful or delinquent behavior;

(4) Attempted or threatened destruction of property or life;

(5) Suicidal tendencies or attempted suicide;

(6) Use of illegal drugs or the abuse of legal drugs or other substances;

(7) Alcohol use disorders;

(8) Recurring financial irresponsibility;

(9) Irresponsibility in performing assigned duties;

(10) Inability to deal with stress, or the appearance of being under unusual stress;

(11) Failure to comply with work directives, hostility or aggression toward fellow workers or authority, uncontrolled anger, violation of safety or security procedures, or repeated absenteeism;

(12) Significant behavioral changes, moodiness, depression, or other evidence of loss of emotional control; and

(13) Any unusual conduct or being subject to any circumstances which tend to show that the individual is not reliable.

(d) A supervisor must immediately remove an individual from HRP duties:

(1) When the supervisor has a reasonable belief that the individual is not reliable, based on either a safety or security concern based on one or more of the types of behaviors and conditions identified in § 712.13(c);

(2) When the individual does not obtain HRP recertification; or

(3) When requested to do so by the HRP certifying official and/or HRP management official.

(e) The supervisor must contact the appropriate personnel office for guidance as to any actions that should occur as a result of the immediate removal.

(f) Immediate removal: If the supervisor immediately removes an HRP-certified individual for any reason specified in this part, he or she must, at a minimum:

(1) Require the individual to stop performing HRP duties;

(2) Take action to ensure the individual is denied both escorted and unescorted access to the material access areas; and

(3) Notify, within 24 hours, the HRP management official of the immediate removal. The HRP management official shall take actions consistent with § 712.19.

§ 712.14 Medical assessment.

(a) Purpose. The HRP medical assessment is performed to evaluate whether an HRP candidate or an HRP-certified individual:

(1) Represents a security concern; or

(2) Has a condition that may prevent the individual from performing HRP duties in a reliable and safe manner.

(b) When performed. (1) The medical assessment is performed initially on HRP candidates and individuals occupying HRP positions who have not yet received HRP certification. The medical assessment is performed annually for HRP-certified individuals, or more often as required by the SOMD.

(2) The Designated Physician and other examiners working under the direction of the Designated Physician also will conduct an evaluation:

(i) If an HRP-certified individual requests an evaluation (i.e., self-referral); or

(ii) If an HRP-certified individual is referred by management for an evaluation.

(c) Process. The Designated Physician, under the supervision of the SOMD, is responsible for the medical assessment of HRP candidates and HRP-certified individuals. In performing this responsibility, the Designated Physician or the SOMD must integrate the medical evaluations, available testing results, psychological evaluations, any psychiatric evaluations, a review of current legal drug use, and any other relevant information. This information is used to determine if a reliability, safety, or security concern exists and if the individual is medically qualified for his or her assigned duties.

(d) Evaluation. The Designated Physician, with the assistance of the Designated Psychologist, must determine the existence or nature of any of the following:

(1) Physical or medical disabilities, such as a lack of visual acuity, defective color vision, impaired hearing, musculoskeletal deformities, and neuromuscular impairment;

(2) Mental/personality disorders or behavioral problems, including alcohol and other substance use disorders, as described in the Diagnostic and Statistical Manual of Mental Disorders;

(3) Use of illegal drugs or the abuse of legal drugs or other substances, as identified by self-reporting or by medical or psychological evaluation or testing;

(4) Threat of suicide, homicide, or physical harm; or

(5) Medical conditions such as cardiovascular disease, endocrine disease, cerebrovascular or other neurologic disease, or the use of drugs for the treatment of conditions that may adversely affect the judgment or ability of an individual to perform assigned duties in a reliable and safe manner.

(e) Job task analysis. Before the initial or annual medical assessment and psychological evaluation, employers must provide, to both the Designated Physician and Designated Psychologist, a job task analysis for each HRP candidate or HRP-certified individual. Medical assessments and psychological evaluations may not be performed if a job task analysis has not been provided.

(f) Psychological evaluations. Psychological evaluations must be conducted:

(1) For initial HRP certification. This psychological evaluation consists of a psychological assessment (test), approved by the Director, Office of Environment, Health, Safety and Security or his or her designee, and a semi-structured interview.

(2) For recertification: This psychological evaluation consists of a semi-structured interview. A psychological assessment (test) may also be conducted as warranted.

(3) Every third year: The medical assessment for recertification must include a psychological assessment (test) approved by the Director, Office of Environment, Health, Safety and Security or his or her designee. This requirement can be implemented over a 3-year period for individuals who are currently in an HRP position.

(4) When additional psychological or psychiatric evaluations are required by the SOMD to resolve any concerns.

(g) Return to work after sick leave. HRP-certified individuals who have been on sick leave for five or more consecutive days, or an equivalent time period for those individuals on an alternative work schedule, must report in person to the Designated Physician, the Designated Psychologist, or the SOMD before being allowed to return to normal duties. The Designated Physician, the Designated Psychologist, or the SOMD must provide a written recommendation to the appropriate HRP supervisor regarding the individual's return to work. An HRP-certified individual also may be required to report to the Designated Physician, the Designated Psychologist, or the SOMD for written recommendation to return to normal duties after any period of sick leave.

(h) Temporary removal or restrictions. The Designated Physician, the Designated Psychologist, or the SOMD may recommend temporary removal of an individual from an HRP position or restrictions on an individual's work in an HRP position if a medical condition or circumstance develops that affects the individual's ability to perform assigned job duties. The Designated Physician, the Designated Psychologist, or the SOMD must immediately recommend medical removal or medical restrictions in writing to the appropriate HRP management official. If the HRP management official concurs, he or she will then notify the appropriate HRP certifying official. To reinstate or remove such restrictions, the Designated Physician, the Designated Psychologist, or the SOMD must make written recommendation to the HRP management official. The HRP management official will then notify the appropriate HRP certifying official.

(i) Medical evaluation after rehabilitation. (1) Individuals who request reinstatement in the HRP following rehabilitative treatment for alcohol use disorder, use of illegal drugs, or the abuse of legal drugs or other substances, must undergo an evaluation, as prescribed by the SOMD, to ensure continued rehabilitation and adequate capability to perform their job duties.

(2) The HRP certifying official may reinstate HRP certification of an individual who successfully completes an SOMD-approved drug or alcohol rehabilitation program. Recertification is based on the SOMD's follow-up evaluation and recommendation. The individual is also subject to unannounced follow-up tests for illegal drugs or alcohol and relevant counseling for 3 years.

(j) Medication and treatment. HRP-certified individuals are required to immediately report to the Designated Physician, the Designated Psychologist, or the SOMD any physical or mental condition requiring medication or treatment. The Designated Physician, the Designated Psychologist, or the SOMD determines if temporary removal of the individual from HRP duties is recommended and follows the procedures pursuant to paragraph (h) of this section.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

§ 712.15 Management evaluation.

(a) Evaluation components. An evaluation by the HRP management official is required before an individual can be considered for initial certification or recertification in the HRP. This evaluation must be based on a careful review of the results of the supervisory review, medical assessment, and drug and alcohol testing. If a safety or security concern is identified with respect to an HRP-certified individual, the HRP management official must take actions consistent with § 712.19(a).

(b) Drug testing. All HRP candidates and HRP-certified individuals are subject to testing for the use of illegal drugs, as required by this part. Testing must be conducted in accordance with 10 CFR part 707, the workplace substance abuse program for DOE contractor employees, and DOE Order 343.1, “Federal Substantive Abuse Testing Program,” for DOE employees. The program must include an initial drug test, random drug tests at least once every 12 months from the previous test, and tests of HRP-certified individuals if they are involved in an incident, unsafe practice, occurrence, or based on reasonable suspicion. Failure to appear for unannounced testing within 2 hours of notification constitutes a refusal to submit to a test. Sites may establish a shorter time period between notification and testing but may not exceed the two-hour requirement. If an HRP-certified individual refuses to submit to a drug test or, based on a drug test, is determined to use illegal drugs, the supervisor must immediately remove the individual from HRP duties and take actions consistent with § 712.13(f).

(c) Alcohol testing. All HRP candidates and HRP-certified individuals are subject to testing for the use of alcohol, as required by this part. The alcohol testing program must include, as a minimum, an initial alcohol test prior to performing HRP duties and random alcohol tests at least once every 12 months from the previous test, and tests of HRP-certified individuals if they are involved in an incident, unsafe practice, occurrence, or based on reasonable suspicion. The supervisor who has been informed that an HRP-certified individual's confirmatory breath alcohol test result is at or above an alcohol concentration of 0.02 percent shall send that individual home and not allow that individual to perform HRP duties for 24 hours, and take all appropriate administrative action consistent with § 712.13(f).

(1) Breath alcohol testing must be conducted by a certified breath alcohol technician and conform to the DOT procedures (49 CFR part 40, Procedures for Transportation Workplace Drug and Alcohol Testing Programs, subparts J through N) for use of an evidential-grade breath analysis device approved for 0.02/0.04 cutoff levels, which conforms to the DOT model specifications and the most recent “Conforming Products List” issued by NHTSA.

(2) An individual required to undergo DOT alcohol testing is subject to the regulations of the DOT. If such an individual's blood alcohol level exceeds DOT standards, the individual's employer may take appropriate disciplinary action.

(3) The following constitutes a refusal to submit to a test and shall be considered as a positive alcohol concentration test of 0.02 percent, which requires the individual be sent home and not allowed to perform HRP duties for 24 hours:

(i) Failure to appear for unannounced testing within 2 hours of notification (or established shorter time for the specific site);

(ii) Failure to provide an adequate volume of breath in 2 attempts without a valid medical excuse; and

(iii) Engaging in conduct that clearly obstructs the testing process, including failure to cooperate with reasonable instructions provided by the testing technician.

(d) Occurrence testing. (1) When an HRP-certified individual is involved in, or associated with, an occurrence requiring immediate reporting to the DOE, the following procedures must be implemented:

(i) Testing for the use of illegal drugs in accordance with the provisions of the DOE policies implementing Executive Order 12564, and 10 CFR part 707 or DOE Order 3792.3, which establish workplace substance abuse programs for contractor and DOE employees, respectively.

(ii) Testing for use of alcohol in accordance with this section.

(2) Testing must be performed as soon as possible after an occurrence that requires immediate notification or reporting.

(3) The supervisor must immediately remove an HRP-certified individual from HRP duties if the individual refuses to undergo the testing required by this subsection.

(e) Testing for reasonable suspicion. (1) If the behavior of an individual in an HRP position creates the basis for reasonable suspicion of the use of an illegal drug or alcohol, that individual must be tested if two or more supervisory or management officials, at least one of whom is in the direct chain of supervision of the individual or is the Designated Physician, the Designated Psychologist, or the SOMD, agree that such testing is appropriate.

(2) Reasonable suspicion must be based on an articulable belief, drawn from facts and reasonable inferences from those particular facts that an HRP-certified individual is in possession of, or under the influence of, an illegal drug or alcohol. Such a belief may be based on, among other things:

(i) Observable phenomena, such as direct observation of the use or possession of illegal drugs or alcohol, or the physical symptoms of being under the influence of drugs or alcohol;

(ii) A pattern of abnormal conduct or erratic behavior;

(iii) Information provided by a reliable and credible source that is independently corroborated; or

(iv) Detection of alcohol odor on the breath.

(f) Counterintelligence evaluation. HRP candidates and, when selected, HRP-certified individuals, must submit to and successfully complete a counterintelligence evaluation, which may include a polygraph examination in accordance with 10 CFR part 709, Polygraph Examination Regulations and any subsequent revisions to that regulation.

§ 712.16 Security review.

(a) A personnel security specialist must review the personnel security file of every HRP candidate and every HRP-certified individual up for certification or recertification.

(b) If the personnel security file review is favorable, this information must be forwarded to the HRP certifying official and so noted on the certification form. If the review reveals a security concern, or if a security concern is identified during another component of the HRP process, the HRP certifying official must be notified, and the personnel security specialist must evaluate the concern in accordance with 10 CFR part 710. If a final determination is made by DOE personnel security to suspend access authorization, the HRP management official must be notified, the individual shall be temporarily removed from the HRP position, the HRP certifying official notified, and the information noted on the certification form.

(c) A favorable adjudication of security concerns under 10 CFR part 710 does not require granting or continuing HRP certification. Security concerns can be reviewed and evaluated for purposes of granting or continuing HRP certification even if the concerns have been favorably resolved under part 710.

(d) Any mental/personality disorder or behavioral issues found in a personnel security file, which could impact an HRP candidate or HRP-certified individual's ability to perform HRP duties, may be provided in writing to the SOMD, Designated Physician, and Designated Psychologist previously identified for receipt of this information. Medical personnel may not share any information obtained from the personnel security file with anyone who is not an HRP certifying official, except as consistent with the Privacy Act of 1974.

(e) If the DOE personnel security review is not completed within the 12-month time period for recertification and the individual's access authorization is not suspended, the HRP certification form shall be forwarded to the HRP certifying official for recertification or temporary removal, pending completion of the personnel security review.

§ 712.17 Instructional requirements.

(a) HRP management officials at each DOE site or facility with HRP positions must establish an initial and annual HRP instruction and education program. The program must provide:

(1) HRP candidates, HRP-certified individuals, supervisors, and managers, and supervisors and managers responsible for HRP positions with the knowledge described in paragraph (b)(1) of this section; and

(2) For all HRP medical personnel, a detailed explanation of HRP duties and responsibilities.

(b) The following program elements must be included in initial and annual instruction. The elements may be tailored to accommodate group differences and refresher training needs:

(1) The objectives of the HRP and the role and responsibilities of each individual in the HRP to include recognizing and responding to behavioral change and aberrant or unusual behavior that may result in a risk to national security or nuclear explosive safety; recognizing and reporting safety and/or security concerns, physical, mental, or emotional conditions that could adversely affect the performance of HRP duties or that require treatment by a doctor, physician's assistant or other health care professional; and prescription drug use; and an explanation of return-to-work requirements and continuous evaluation of HRP participants; and

(2) For those who have nuclear explosive responsibilities, a detailed explanation of duties and safety requirements.

§ 712.18 Transferring HRP certification.

(a) For HRP certification to be transferred, the individual must currently be certified in the HRP.

(b) Transferring the HRP certification from one site to another requires the following before the individual is allowed to perform HRP duties at the new site:

(1) Verify that the individual is currently certified in the HRP and is transferring into a designated HRP position;

(2) Incorporate the individual into the new site's alcohol and drug-testing program;

(3) Ensure that the 12-month time period for HRP requirements that was established at the prior site is not exceeded; and

(4) Provide site-specific instruction.

(c) Temporary assignment to HRP positions at other sites requires verification that the individual is currently enrolled in the HRP and has completed all site-specific instruction. The individual is required to return to the site that maintains his or her HRP certification for recertification.

§ 712.19 Actions related to removal, revocation and/or reinstatement.

(a) Temporary removal. The HRP management official shall direct the temporary removal of an HRP-certified individual when the management official:

(1) Identifies, during the course of the management evaluation, a safety or security concern that warrants such removal based on one or more of the types of behaviors and conditions identified in § 712.13(c);

(2) Receives a supervisor's written notice of the immediate removal of an HRP-certified individual; or

(3) Receives a recommendation from the Designated Physician, the Designated Psychologist, or the SOMD to medically remove an HRP-certified individual consistent with § 712.14(h).

(b) The temporary removal of an HRP-certified individual from HRP duties pending a determination of the individual's reliability is an interim, precautionary action and does not constitute a determination that the individual is not fit to perform his or her required duties. Removal is not, in itself, cause for loss of pay, benefits, or other changes in employment status. Immediately upon directing a temporary removal, the HRP management official must notify the supervisor to take appropriate actions consistent with an immediate removal. Within five (5) business days of placing the individual on a temporary removal, the HRP management official must notify the individual in writing that s/he is temporarily removed.

(c) If temporary removal is based on derogatory information that is a security concern, the HRP management official must notify the HRP certifying official and the applicable DOE personnel security office.

(d) If temporary removal is based on a medical concern, the HRP management official must obtain a recommendation from the Designated Physician, Designated Psychologist, or the SOMD consistent with § 712.14(h).

(e) If the HRP management official determines, after conducting an evaluation of the circumstances or information that led to the temporary removal, that an individual who has been temporarily removed continues to meet the requirements for certification, the HRP management official must:

(1) Direct that the supervisor reinstate the individual and provide written explanation of the reasons and factual bases for the action;

(2) Notify the individual; and

(3) Notify the HRP certifying official.

(f) If the HRP management official determines that an individual who has been temporarily removed does not meet the HRP requirements for certification, the HRP management official must prepare a case chronology that explains why the individual does not meet the requirement for certification and forward it to the HRP certifying official. The HRP management official's determination that an individual does not meet certification requirement must be based on one or more of the types of behaviors and conditions identified in § 712.13(c). The HRP certifying official must review the case chronology from the HRP management official and take one of the following actions:

(1) Direct that the supervisor reinstate the individual, with any applicable medical restrictions, provide written explanation of the reasons and factual bases for the action, and notify the individual;

(2) Direct continuation of the temporary removal pending completion of specified actions (e.g., medical assessment, treatment) to resolve the concerns about the individual's reliability; or

(3) Recommend to the Manager the revocation of the individual's certification and provide the case chronology to the Manager. If the HRP certifying official is the Manager, he or she should take actions consistent with paragraph (g)(2) of this section.

(g) The Manager, on receiving the HRP management official's case chronology and the HRP certifying official's recommendation (if any), must take one of the following actions:

(1) Direct that the supervisor reinstate the individual, provide written explanation of the reasons and factual bases for the action, and notify the individual;

(2) Direct revocation of the individual's HRP certification, in accordance with paragraph (h) of this section; or

(3) Direct continuation of the temporary removal pending completion of specified actions (e.g., medical assessment, treatment) to resolve the concerns about the individual's reliability.

(h) Notification of Manager's initial decision: If the action is revocation, the Manager must direct the HRP management official to prepare an evaluative report. The appropriate DOE or NNSA counsel must review the evaluative report for legal sufficiency. Upon completion of the evaluative report, the Manager must send a letter by certified mail (return receipt requested) or hand deliver it with record of delivery to the individual whose certification is revoked notifying him or her of the reasons for the revocation and the options for review. The evaluative report must be appended to the letter. The Manager may withhold such a report, or portions thereof, to the extent that he or she determines that the report, or portions thereof, may be exempt from access by the employee under the Privacy Act or the Freedom of Information Act.

(i) If an individual is directed by the Manager or HRP certifying official to take specified actions to resolve HRP concerns pursuant to paragraph (f)(2) or (g)(3) of this section he or she must be reevaluated after those actions have been completed, and the Manager must direct either:

(1) Reinstatement of the individual; or

(2) Revocation of the individual's HRP certification. In the case of revocation, the HRP management official will be directed to prepare an evaluative report.

§ 712.20 Request for reconsideration or certification review hearing.

(a) An individual who receives notification of the Manager's decision to revoke his or her HRP certification under § 712.19 may choose one of the following options:

(1) Submit a written request to the Manager for reconsideration of the decision to revoke certification. The request must include the individual's response to the information that gave rise to the concern. The request must be sent by certified mail to the Manager within 20 working days after the individual received notice of the Manager's decision; or

(2) Submit a written request to the Manager for a certification review hearing. The request for a hearing must be sent by certified mail to the Manager within 20 working days after the individual receives notice of the Manager's decision.

(b) If an individual requests reconsideration by the Manager but not a certification review hearing, the Manager must, within 20 working days after receipt of the individual's request, send by certified mail (return receipt requested) a final agency decision to the individual.

(c) If an individual requests a certification review hearing, the Manager must forward the request to the Office of Hearings and Appeals.

(d) If an individual takes no action within 20 working days after receipt of the Manager's decision, the Manager's decision will become a final agency decision.

§ 712.21 Appointment of DOE counsel.

(a) Upon receipt from the individual of a written request for a certification review hearing, the Manager shall request appointment of DOE counsel as soon as possible.

(b) DOE Counsel is authorized to consult directly with the individual if he is not represented by counsel, or with the individual's counsel or representative if so represented, to clarify issues and reach stipulations with respect to testimony and contents of documents and other physical evidence. Such stipulations shall be binding upon the individual and the DOE Counsel for the purposes of this subpart.

§ 712.22 Office of Hearings and Appeals.

(a) Upon receipt of the hearing request from the Manager, the Director, DOE Office of Hearings and Appeals, shall appoint, as soon as practicable, an Administrative Judge.

(b) The Administrative Judge must have a DOE “Q” access authorization.

(c) An individual who requests a certification review hearing has the right to appear personally before the Administrative Judge; to present evidence in his or her own behalf, through witnesses or by documents, or by both; and to be accompanied and represented at the hearing by counsel or any other person of the individual's choosing and at the individual's own expense.

(d) An individual must come forward with evidence to demonstrate that the decision to revoke his or her HRP certification was clearly erroneous or that extraordinary circumstances warrant recertification into HRP. Evidence that the individual has rehabilitated or reformed since the time of the Manager's decision will not be considered by the Administrative Judge.

(e) DOE Counsel shall assist the Administrative Judge in establishing a complete administrative hearing record in the proceeding and bringing out a full and true disclosure of all facts, both favorable and unfavorable, having bearing on the issues before the Administrative Judge.

(f) In conducting the proceedings, the Administrative Judge will:

(1) Determine the date, time, and location of the hearing, including whether the hearing will be conducted by video teleconference;

(2) At least 7 calendar days prior to date scheduled for the hearing, convene a prehearing conference for the purpose of discussing stipulations and exhibits, identifying witnesses, and disposing of other appropriate matters. The conference will usually be conducted by telephone;

(3) Receive all relevant and material information relating to the individual's fitness for HRP duties through witnesses or documentation;

(4) Ensure that the individual is permitted to offer information in his or her behalf; to call, examine, and cross-examine witnesses and other persons who have made written or oral statements, and to present and examine documentary evidence to the extent permitted by national security;

(5) Require the testimony of the individual and all witnesses be given under oath or affirmation;

(6) Ensure that a transcript of the certification review proceedings is made; and

(7) Not engage in ex parte communications with either party.

(g) The Administrative Judge shall have all powers necessary to regulate the conduct of proceedings, including, but not limited to, establishing a list of persons to receive service of papers, issuing subpoenas for witnesses to attend the hearing or for the production of specific documents or other physical evidence, administering oaths and affirmations, ruling upon motions, receiving evidence, regulating the course of the hearing, disposing of procedural requests or similar matters, and taking other actions consistent with the regulations in this part. Requests for subpoenas shall be granted except where the Administrative Judge finds that the grant of subpoenas would clearly result in evidence or testimony that is repetitious, incompetent, irrelevant, or immaterial to the issues in the case.

(h) The Administrative Judge may return a case to the HRP Manager for a final agency decision consistent with § 712.20(b) if—

(1) The individual or his or her attorney fails to heed the instructions of the Administrative Judge;

(2) The individual fails to appear at the appointed time, date and location for the certification review hearing;

(3) The individual otherwise fails to cooperate at the hearing phase of the process; or

(4) The individual withdraws his/her request for a certification review hearing.

(i) Based on a review of the administrative hearing record, the Administrative Judge shall prepare a decision regarding the individual's eligibility for recertification in the HRP, which shall consist of written findings and a supporting statement of reasons. In making a decision, the Administrative Judge shall ensure that any doubt as to an individual's certification shall be resolved against the individual in favor of national security and/or safety.

§ 712.23 Administrative Judge's decision.

(a) Within 30 calendar days of the receipt of the hearing transcript by the Administrative Judge or the closing of the record, whichever is later, the Administrative Judge should forward his or her decision to the Director, Office of Environment, Health, Safety and Security. The Administrative Judge's decision must be accompanied by a copy of the record.

(b) Within 10 calendar days of receipt of the decision and the administrative record, the Director, Office of Environment, Health, Safety and Security should:

(1) Notify the individual and Manager in writing of the Administrative Judge's decision;

(2) Advise the individual in writing of the appeal procedures available to the individual in paragraph (c) of this section if the decision is unfavorable to the individual;

(3) Advise the Manager in writing of the appeal procedures available to the Manager in paragraph (c) of this section if the decision is favorable to the individual; and

(4) Provide the individual and/or counsel or representative, and the Manager a copy of the Administrative Judge's decision and the administrative record.

(c) The individual or the Manager may file with the Director, Office of Environment, Health, Safety and Security a written request for further review of the decision by the cognizant Under Secretary along with a statement required by paragraph (e) of this section within 20 working days of the individual's or Manager's receipt of the Administrative Judge's decision;

(d) The copy of any request for further review of the individual's case by the cognizant Under Secretary filed by the Manager shall be provided to the individual by the Manager.

(e) The party filing a request for review of the individual's case by the cognizant Under Secretary shall include with the request a statement identifying the issues on which it wishes the cognizant Under Secretary to focus.

(f) The Administrative Judge's decision shall be considered final if a written request for review is not filed in accordance with paragraph (c) of this section.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

§ 712.24 Final decision by DOE Under Secretary.

(a) Within 10 calendar days of receipt of the written request for review, the Director, Office of Environment, Health, Safety and Security should forward to the cognizant Under Secretary the written request for review, the Administrative Judge's decision, and the administrative record.

(b) Upon receipt of the written request for review, the Administrative Judge's decision, and the administrative record, the cognizant Under Secretary, in consultation with the DOE General Counsel, will issue a final written decision. The cognizant Under Secretary may delegate this authority. In issuing a final decision, the cognizant Under Secretary shall expressly state that he or she is either revoking or restoring an individual's HRP certification. A copy of this decision must be sent by certified mail (return receipt requested) to the Manager and to the individual.

(c) The cognizant Under Secretary shall consider only that evidence and information in the administrative record at the time of the Administrative Judge's decision.

[83 FR 18200, Apr. 26, 2018, as amended at 88 FR 41292, June 26, 2023]

§ 712.25 Cooperation by the individual.

(a) It is the responsibility of the HRP candidate or HRP certified individual to provide full, frank, and truthful answers to relevant and material questions, and when requested, furnish, or authorize others to furnish, information that DOE deems pertinent to reach a decision regarding HRP certification or recertification. This obligation to cooperate applies at any stage, including but not limited to initial certification, recertification, temporary removal, revocation, and/or hearing. The individual or candidate may elect not to cooperate; however, such refusal may prevent DOE from reaching an affirmative finding required for granting or continuing HRP certification. In this event, any HRP certification then in effect may be revoked, or, for HRP candidates, may not be granted.

(b) An HRP certified individual who receives notification of the Manager's decision to revoke his or her certification due to failure to cooperate may choose one of the following options:

(1) Take no action; or

(2) Within 20 working days after the individual received notice of the Manager's revocation decision, submit a written request by certified mail to the Manager for reconsideration. The request must include the individual's response to the information that gave rise to the revocation decision.

(c) Upon receipt of the request for reconsideration, the Manager shall notify the individual, in writing, within 20 calendar days of receipt of the written appeal, as to whether the action to revoke certification was appropriate. If the Manager determines that the action was inappropriate, he or she shall reverse revocation.

Subpart B Medical Standards

§ 712.30 Applicability.

This subpart establishes standards and procedures for conducting medical assessments of DOE and DOE contractor individuals in HRP positions.

§ 712.31 Purpose.

The standards and procedures set forth in this subpart are necessary for DOE to:

(a) Identify the presence of any mental/personality disorders, physical, or behavioral characteristics or conditions that present or are likely to present an unacceptable impairment in reliability;

(b) Facilitate the early diagnosis and treatment of disease or impairment and foster accommodation and rehabilitation;

(c) Determine what functions an HRP-certified individual may be able to perform and to facilitate the proper placement of individuals; and

(d) Provide for continuing monitoring of the health status of individuals to facilitate early detection and correction of adverse health effects, trends, or patterns.

§ 712.32 Designated Physician.

(a) The Designated Physician must be qualified to provide professional expertise in the area of occupational medicine as it relates to the HRP.

(b) The Designated Physician must:

(1) Be a graduate of an accredited school of medicine or osteopathy;

(2) Have a valid, unrestricted state license to practice medicine in the state where HRP medical assessments occur;

(3) Have met the applicable HRP instruction requirements; and

(4) Be eligible for the appropriate DOE access authorization.

(c) The Designated Physician is responsible for the medical assessments of HRP candidates and HRP-certified individuals, including determining which components of the medical assessments may be performed by other qualified personnel. Although a portion of the assessment may be performed by another physician, physician's assistant, or nurse practitioner, the Designated Physician remains responsible for:

(1) Supervising the evaluation process;

(2) Interpreting the results of evaluations;

(3) Documenting medical conditions or issues that may disqualify an individual from the HRP;

(4) Providing medical assessment information to the Designated Psychologist to assist in determining psychological fitness;

(5) Determining, in conjunction with DOE if appropriate, the location and date of the next required medical assessment; and

(6) Signing a recommendation about the medical fitness of an individual for certification or recertification.

(d) The Designated Physician must immediately report to the SOMD any of the following about himself or herself:

(1) Initiation of an adverse action by any state medical licensing board or any other professional licensing board;

(2) Initiation of an adverse action by any Federal regulatory board since the last designation;

(3) The withdrawal of the privilege to practice by any institution;

(4) Being named a defendant in any criminal proceedings (felony or misdemeanor) since the last designation;

(5) Being evaluated or treated for alcohol use disorder or drug dependency or abuse since the last designation; or

(6) Occurrence, since the last designation, of a physical, mental/personality disorder, or health condition that might affect his or her ability to perform professional duties.

§ 712.33 Designated Psychologist.

(a) The Designated Psychologist reports to the SOMD and determines the psychological fitness of an individual to participate in the HRP. The results of this evaluation may be provided only to the Designated Physician or the SOMD.

(b) The Designated Psychologist must:

(1) Hold a doctoral degree from a clinical psychology program that includes a one-year clinical internship approved by the American Psychological Association or an equivalent program;

(2) Have accumulated a minimum of three years postdoctoral clinical experience with a major emphasis in psychological assessment and testing;

(3) Have a valid, unrestricted state license to practice clinical psychology in the state where HRP medical assessments occur;

(4) Have met the applicable HRP instruction requirements; and

(5) Be eligible for the appropriate DOE access authorization.

(c) The Designated Psychologist is responsible for all psychological evaluations of HRP candidates, HRP-certified individuals, and others as directed by the SOMD. Although a portion of the psychological evaluation may be performed by another psychologist, the Designated Psychologist must:

(1) Supervise the psychological evaluation process and designate which components may be performed by other qualified personnel;

(2) Upon request of management, assess the psychological fitness of HRP candidates and HRP-certified individuals for HRP duties, including specific work settings, and recommend referrals as indicated; and

(3) Make referrals for psychiatric, psychological, substance abuse, or personal or family problems, and monitor the progress of individuals so referred.

(d) The Designated Psychologist must immediately report to the SOMD any of the following about himself or herself:

(1) Initiation of an adverse action by any state medical licensing board or any other professional licensing board;

(2) Initiation of an adverse action by any Federal regulatory board since the last designation;

(3) The withdrawal of the privilege to practice by any institution;

(4) Being named a defendant in any criminal proceeding (felony or misdemeanor) since the last designation;

(5) Being evaluated or treated for alcohol use disorder or drug dependency or abuse since the last designation; or

(6) Occurrence since the last designation of a physical, mental/personality disorder, or health condition that might affect his or her ability to perform professional duties.

§ 712.34 Site Occupational Medical Director.

(a) The SOMD must nominate a physician to serve as the Designated Physician and a clinical psychologist to serve as the Designated Psychologist. The nominations must be sent through the Manager to the Director, Office of Environment, Health, Safety and Security or his or her designee. Each nomination must describe the nominee's relevant training, experience, and licensure, and include a curriculum vitae and a copy of the nominee's current state or district license.

(b) The SOMD must submit a renomination report biennially through the Manager to the Director, Office of Environment, Health, Safety and Security or his or her designee. This report must be submitted at least 60 days before the second anniversary of the initial designation or of the last redesignation, whichever applies. The report must include:

(1) A statement evaluating the performance of the Designated Physician and Designated Psychologist during the previous designation period; and

(2) A copy of the valid, unrestricted state or district license of the Designated Physician and Designated Psychologist.

(c) The SOMD must submit, annually, to the Director, Office of Environment, Health, Safety and Security or his or her designee through the Manager, a written report summarizing HRP medical activity during the previous year. The SOMD must comply with any DOE directives specifying the form or contents of the annual report.

(d) The SOMD must investigate any reports of performance issues regarding a Designated Physician or Designated Psychologist, and the SOMD may suspend either official from HRP-related duties. If the SOMD suspends either official, the SOMD must notify the Director, Office of Environment, Health, Safety and Security or his or her designee and provide supporting documentation and reasons for the action.

[69 FR 3223, Jan. 23, 2004, as amended at 71 FR 68731, Nov. 28, 2006; 83 FR 18208, Apr. 26, 2018; 88 FR 41292, June 26, 2023]

§ 712.35 Director, Office of Environment, Health, Safety and Security.

The Director, Office of Environment, Health, Safety and Security or his or her designee must:

(a) Develop policies, standards, and guidance for the medical aspects of the HRP, including the psychological testing inventory to be used;

(b) Review the qualifications of Designated Physicians and Designated Psychologists, and concur or nonconcur with their designations by sending a statement to the Manager and an informational copy to the SOMD; and

(c) Provide technical assistance on medical aspects of the HRP to all DOE elements and DOE contractors.

[69 FR 3223, Jan. 23, 2004, as amended at 71 FR 68732, Nov. 28, 2006; 83 FR 18208, Apr. 26, 2018; 88 FR 41292, June 26, 2023]

§ 712.36 Medical assessment process.

(a) The Designated Physician, under the supervision of the SOMD, is responsible for the medical assessment of HRP candidates and HRP-certified individuals. In carrying out this responsibility, the Designated Physician or the SOMD must integrate the medical evaluations, psychological evaluations, psychiatric evaluations, and any other relevant information to determine an individual's overall medical qualification for assigned duties.

(b) Employers must provide a job task analysis for those individuals involved in HRP duties to both the Designated Physician and the Designated Psychologist before each medical assessment and psychological evaluation. HRP medical assessments and psychological evaluations may not be performed if a job task analysis has not been provided.

(c) The medical process by the Designated Physician includes:

(1) Medical assessments for initial certification, annual recertification, and evaluations for reinstatement following temporary removal from the HRP;

(2) Evaluations resulting from self-referrals and referrals by management;

(3) Routine medical contacts and occupational and nonoccupational health counseling sessions; and

(4) Review of current legal drug use.

(d) Psychological evaluations must be conducted:

(1) For initial certification. This psychological evaluation consists of a generally accepted psychological assessment (test) approved by the Director, Office of Environment, Health, Safety and Security or his or her designee and a semi-structured interview.

(2) For recertification. This psychological evaluation consists of a semi-structured interview, which is conducted annually at the time of the medical examination.

(3) Every third year. The medical assessment for recertification must include a generally accepted psychological assessment (test) approved by the Director, Office of Environment, Health, Safety and Security or his or her designee.

(4) When the SOMD determines that additional psychological or psychiatric evaluations are required to resolve HRP concerns as listed in § 712.13(c).

(e) Following absences requiring return-to-work evaluations under applicable DOE directives, the Designated Physician, the Designated Psychologist, or the SOMD must determine whether a psychological evaluation is necessary.

(f) Except as provided in paragraph (g) of this section, the Designated Physician must forward the completed medical assessment of an HRP candidate and HRP-certified individual to the SOMD, who must make a recommendation, based on the assessment, to the individual's HRP management official. If the Designated Physician determines that a currently certified individual no longer meets the HRP requirements, the Designated Physician must immediately, orally, inform the HRP management official. A written explanation must follow within 24 hours.

(g) The Designated Physician, the Designated Psychologist, or the SOMD may make a medical recommendation for return to work and work accommodations for HRP-certified individuals.

(h) The following documentation is required after treatment of an individual for any disqualifying condition:

(1) A summary of the diagnosis, treatment, current status, and prognosis to be furnished by the treatment provider to the Designated Physician;

(2) The medical opinion of the Designated Physician advising the individual's supervisor whether the individual is able to return to work in either an HRP or non-HRP capacity; and

(3) Any periodic monitoring plan, approved by the Designated Physician or the Designated Psychologist and the SOMD, used to evaluate the reliability of the individual.

[69 FR 3223, Jan. 23, 2004, as amended at 71 FR 68731, Nov. 28, 2006; 83 FR 18208, Apr. 26, 2018; 88 FR 41292, June 26, 2023]

§ 712.37 Evaluation for hallucinogen use.

If DOE determines that an HRP candidate or HRP-certified individual has used any hallucinogen, the individual is not eligible for certification or recertification unless:

(a) Five years have passed since the last use of the hallucinogen;

(b) There is no evidence of any flashback within the last five years from the previous hallucinogen use; and

(c) The individual has a record of acceptable job performance and observed behavior.

§ 712.38 Maintenance of medical records.

(a) The medical records of HRP candidates and HRP-certified individuals must be maintained in accordance with the Privacy Act, 5 U.S.C. 552a, and DOE implementing regulations in 10 CFR part 1008; the Department of Labor's regulations on access to individual exposure and medical records, 29 CFR 1910.1020; and applicable DOE directives. DOE contractors also may be subject to section 503 of the Rehabilitation Act, 29 U.S.C. 793, and its implementing rules, including confidentiality provisions in 41 CFR 60-741.23 (d).

(b) The psychological record of HRP candidates and HRP-certified individuals is a component of the medical record. The psychological record must:

(1) Contain any clinical reports, test protocols and data, notes of individual contacts and correspondence, and other information pertaining to an individual's contact with a psychologist;

(2) Be stored in a secure location in the custody of the Designated Psychologist; and

(3) Be kept separate from other medical record documents, with access limited to the SOMD and the Designated Physician.

PART 715 DEFINITION OF NONRECOURSE PROJECT-FINANCED

Authority: 42 U.S.C. 7651o(a)(2)(B); 42 U.S.C. 7254.

Source: 56 FR 55064, Oct. 24, 1991, unless otherwise noted.

§ 715.1 Purpose and scope.

This part sets forth the definition of “nonrecourse project-financed” as that term is used to define “new independent power production facility,” in section 416(a)(2)(B) of the Clean Air Act Amendments of 1990, 42 U.S.C. 7651o(a)(2)(B). This definition is for purposes of section 416(a)(2)(B) only. It is not intended to alter or impact the tax treatment of any facility or facility owner under the Internal Revenue Code and regulations.

§ 715.2 Definitions.

As used in this subpart—

Act means the Clean Air Act Amendments of 1990, 104 Stat. 2399.

Facility means a “new independent power production facility” as that term is used in the Act, 42 U.S.C. 7651o(a)(2).

§ 715.3 Definition of “Nonrecourse Project-Financed”.

Nonrecourse project-financed means when being financed by any debt, such debt is secured by the assets financed and the revenues received by the facility being financed including, but not limited to, part or all of the revenues received under one or more agreements for the sale of the electric output from the facility, and which neither an electric utility with a retail service territory, nor a public utility as defined by section 201(e) of the Federal Power Act, as amended, 16 U.S.C. 824(e), if any of its facilities are financed with general credit, is obligated to repay in whole or in part. A commitment to contribute equity or the contribution of equity to a facility by an electric utility shall not be considered an obligation of such utility to repay the debt of a facility. The existence of limited guarantees, commitments to pay for cost overruns, indemnity provisions, or other similar undertakings or assurances by the facility's owners or other project participants will not disqualify a facility from being “nonrecourse project-financed” as long as, at the time of the financing for the facility, the borrower is obligated to make repayment of the term debt from the revenues generated by the facility, rather than from other sources of funds. Projects that are 100 percent equity financed are also considered “nonrecourse project-financed” for purposes of section 416(a)(2)(B).

PART 719 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS

Authority: 42 U.S.C. 2201, 5814, 5815 and 7101, et seq.; 50 U.S.C. 2401, et seq.

Source: 78 FR 25809, May 3, 2013, unless otherwise noted.

Subpart A General Provisions

§ 719.1 What is the purpose of this part?

This part facilitates management of retained legal counsel and contractor legal costs, including litigation and legal matter costs. It requires the contractor to develop a Legal Management Plan, to document the analysis used to decide when to utilize outside counsel, and to document what law firm or individual attorney will be engaged as outside counsel. This part also requires the contractor to document the terms of the engagement with retained legal counsel. Payment of Department-retained law firm invoices and reimbursement of contractor legal costs under covered contracts are subject to compliance with this part.

§ 719.2 What are the definitions of terms used in this part?

For purposes of this part:

Alternative dispute resolution includes, but is not limited to, processes such as mediation, neutral evaluation, mini-trials and arbitration.

Contractor means any person or entity with whom the Department contracts for the acquisition of goods or services.

Covered contracts means those contracts described in § 719.3 of this part.

Days means calendar days.

Department means the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA).

Department Counsel means the attorney in the DOE or NNSA field office, or Headquarters office, designated as the contracting officer's representative and point of contact for a contractor or for Department retained legal counsel, for purposes of this part.

General Counsel means the DOE General Counsel for DOE legal matters and the NNSA General Counsel for NNSA legal matters.

Legal costs means, but is not limited to, administrative expenses associated with the provision of legal services by retained legal counsel; the costs of legal services provided by retained legal counsel; the costs of the services, if the services are procured in connection with a legal matter, of accountants, consultants, experts or others retained by the contractor or by retained legal counsel; and any similar costs incurred by retained legal counsel or in connection with the services of retained legal counsel.

Legal Management Plan means a document required by subpart B of this part describing the contractor's practices for managing legal costs and legal matters for which it procures the services of retained legal counsel.

Litigation means a proceeding arising under or related to a contract between the contractor and the Department to which the contractor is a party in a State, tribal, territorial, foreign, or federal court or before an administrative body or an arbitrator.

Retained legal counsel means a licensed attorney working in the private sector who is retained by a contractor or the Department to provide legal services.

Retrospective insurance means any insurance policy under which the premium is not fixed but is subject to adjustments to reimburse the insurance carrier for actual losses incurred or paid (e.g. claims, settlements, damages, and legal costs). Retrospective insurance includes service-type insurance policies as described in 48 CFR 928.370.

Settlement agreement means a written agreement between a contractor and one or more parties pursuant to which one or more parties waives the right to pursue a legal claim in exchange for something of value.

Significant matters means legal matters involving significant issues as determined by Department Counsel and identified to a contractor in writing, and any legal matters where the amount of any legal costs, over the life of the matter, is expected to exceed $100,000.

Staffing and Resource Plan means a statement prepared in accordance with subpart B of this part by retained legal counsel that describes the method for managing a Significant Matter in litigation.

§ 719.3 What contracts are covered by this part?

(a) Unless excluded under § 719.5, this part covers the following three categories of contracts:

(1) All management and operating contracts;

(2) Non-management and operating cost reimbursement contracts exceeding $100,000,000; and

(3) Non-management and operating contracts exceeding $100,000,000 that include cost reimbursable elements exceeding $10,000,000 (e.g., contracts with both fixed-price and cost-reimbursable line items where the cost-reimbursable line items exceed $10,000,000 or time and materials contracts where the materials portions exceed $10,000,000).

(b) This part also covers contracts otherwise not covered by paragraph (a) of this section but which contain a clause requiring compliance with this part.

(c) This part also covers any contract the Department awards directly to retained legal counsel exceeding $100,000.

§ 719.4 Are law firms that are retained by contract by the Department covered by this part?

Legal counsel retained under fixed rate or other type of contract or other agreement by the Department to provide legal services must comply with the following if the legal costs over the life of the matter for which counsel has been retained are expected by the Department to exceed $100,000 and retained legal counsel are so notified by the Department:

(a) Requirements related to Staffing and Resource Plans in subpart B of this part;

(b) Cost guidelines in subpart E of this part; and

(c) Engagement letter requirements in subpart C of this part if the retained legal counsel subcontracts legal work valued at $25,000 or more (e.g., a law firm retained by the Department subcontracts with another law firm to provide $26,000 in discovery-related legal work).

§ 719.5 What contracts are not covered by this part?

This part does not cover any contract under which the Department is not responsible for directly reimbursing the contractor for legal costs, such as fixed price contracts.

§ 719.6 Are there any types of legal matters not included in the coverage of this part?

Legal matters not covered by this part include:

(a) Matters handled by counsel retained by an insurance carrier, except under retrospective insurance in accordance with § 719.45;

(b) Routine intellectual property law support services; and

(c) Routine workers and unemployment compensation matters.

§ 719.7 Is there a procedure for exceptions or deviations from this part?

(a) Requests for exceptions or deviations from this part must be made in writing to Department Counsel and approved by the General Counsel. If an alternate procedure is proposed for compliance with an individual requirement in this part, that procedure must be included in the written request by the contractor. The General Counsel or his/her delegee shall provide a written response to such requests; however the response shall not require a justification of the Department's exercise of its discretion.

(b) The General Counsel may authorize exceptions or deviations requested under paragraph (a) of this section. The General Counsel may also establish exceptions to this part based on current field office and contractor practices that satisfy the purpose of these requirements.

(c) Exceptions to this part that are also a deviation from the Department of Energy Acquisition Regulation (DEAR) cost principles (see subpart D of this part) must be approved in accordance with applicable DOE procurement policy. See, e.g., DOE Acquisition Guide chapter 1.1, requiring approval by the Senior Procurement Executive of DOE or NNSA as applicable. In any event, the written request from a contractor for a deviation from a cost principle relating to this part must be submitted to the contracting officer, with a copy provided to Department Counsel.

§ 719.8 Does the provision of protected documents from the contractor to the Department constitute a waiver of privilege?

Contractors are required to provide detailed information about third-party claims and litigation to the Department. The Department and its contractors typically share common legal and strategic interests relating to pending or threatened litigation. The common interest between the parties is primarily rooted in the fact that the Department reimburses contractors for allowable costs incurred when litigation is threatened or initiated against contractors. However, other sources of the common interest between the Department and its contractors may include, but are not limited to, an interest in completion of the agency's important mission work and an interest in safe and efficient operation of the Department's facilities. To the extent documents associated with compliance with this part (e.g., Staffing and Resource Plans, invoices, engagement letters, settlement authority requests, and draft pleadings) are protected from disclosure to third parties because the items constitute attorney work product and/or involve attorney client communications, the contractor's provision of these items to the Department does not constitute a waiver of privilege. As long as the Department and the contractor share a common interest in the outcome of legal matters, this mutual legal interest permits the parties to share privileged material without waiving any applicable privilege.

Subpart B Legal Management Plan, Staffing and Resource Plan and Annual Legal Budget

§ 719.10 Who must submit a Legal Management Plan?

Contractors who are parties to contracts identified under § 719.3(a) and (b) must submit a Legal Management Plan.

§ 719.11 When must a Legal Management Plan be submitted or revised?

(a) Contractors must submit a Legal Management Plan to Department Counsel within 60 days following award of the contract. The deadline for submitting the Legal Management Plan may be extended by Department Counsel.

(b) Contractors must submit a revised Legal Management Plan upon request of Department Counsel within 60 days of receipt of the Department Counsel's request. The request for a revised Legal Management Plan shall include an explanation of the request. The deadline for submitting the Legal Management Plan may be extended by the Department Counsel.

§ 719.12 What information must be included in the Legal Management Plan?

The Legal Management Plan must include the following items:

(a) A description of the contractor's in-house counsel resources at the time the Legal Management Plan is submitted, including areas of expertise and an explanation of the types of matters expected to be handled in-house.

(b) A description of the legal matters that may necessitate engagement of retained legal counsel.

(c) A description of the factors the contractor will consider in determining whether to handle a particular matter utilizing retained legal counsel.

(d) An outline of the factors the contractor must consider in selecting retained legal counsel, including:

(1) Cost;

(2) Past performance of previously retained counsel;

(3) Particular expertise in a specific area of the law;

(4) Familiarity with the Department's activity at the particular site and the prevalent issues associated with facility history and current operations;

(5) Location of retained legal counsel relative to:

(i) The site involved in the matter,

(ii) Any forum in which the matter will be processed, and

(iii) The location where a significant portion of the work will be performed;

(6) Experience as an advocate in alternative dispute resolution procedures such as mediation;

(7) Actual or potential conflicts of interest; and

(8) The means and rate of compensation (e.g., hourly billing, fixed fee, blended fees).

(e) A description of the system that the contractor will use to review each matter in litigation to determine whether and when alternative dispute resolution is appropriate.

(f) A description of the role of in-house counsel in cost management.

(g) A description of the contractor's process for review and approval of invoices for legal costs.

(h) A description of the contractor's strategy for interaction with, and supervision of, retained legal counsel.

(i) A description of the procedures the contractor will employ in order to seek timely approval from Department Counsel to settle any legal matters as required by § 719.34 of this part;

(j) A description of the contractor's strategy for keeping Department Counsel apprised of all legal matters covered by this part (e.g., regularly scheduled meetings and written communications).

§ 719.13 Who at the Department receives and reviews the Legal Management Plan?

Contractors must submit a Legal Management Plan to Department Counsel. If the contractor has not been notified of the assignment of Department Counsel, the contractor must submit the Legal Management Plan to the contracting officer and the DOE Deputy General Counsel for Litigation and Enforcement or the NNSA Deputy General Counsel as appropriate.

§ 719.14 Will the Department notify the contractor concerning the adequacy or inadequacy of the submitted Legal Management Plan?

The Contracting Officer or Department Counsel will notify the contractor of any non-compliance or inadequate information relating to requirements in § 719.12 within 30 days of the contractor's submission of the plan. The contractor must either correct matters identified within 30 days of notification or file a letter with the General Counsel disputing the determination of a deficiency.

§ 719.15 What are the requirements for a Staffing and Resource Plan?

(a) For significant matters in litigation, the contractor must require retained legal counsel to prepare a Staffing and Resource Plan. The contractor must then forward the Staffing and Resource Plan to Department Counsel.

(b) Retained legal counsel retained directly by the Department subject to this part must prepare a Staffing and Resource Plan and forward it to Department Counsel.

(c) A Staffing and Resource Plan must describe the following:

(1) Major phases likely to be involved in the handling of the matter;

(2) Timing and sequence of such phases;

(3) Projected cost for each phase of the representation; and

(4) Detailed description of resources that the retained legal counsel intends to devote to the representation.

(d) A Staffing and Resource Plan must include a budget, broken down by phases, including at a minimum the following phases:

(1) Matter assessment, development and administration;

(2) Pretrial pleadings and motions;

(3) Discovery;

(4) Trial preparation and trial; and

(5) Appeal.

(e) The contractor must notify Department Counsel before incurring retained legal counsel costs in excess of costs listed in the budget developed pursuant to paragraph (d) of this section.

§ 719.16 When must the Staffing and Resource Plan be submitted?

(a) The contractor or retained legal counsel must submit the Staffing and Resource Plan to Department Counsel within 30 days after the filing of an answer or a dispositive motion in lieu of an answer, 30 days after a determination that the cost is expected to exceed $100,000, or 30 days after notification from Department Counsel that a matter is considered significant, whichever is sooner. The deadline for submitting the Staffing and Resource Plan may be extended by Department Counsel.

(b) Department Counsel may state objections to the Staffing and Resource Plan within 30 days of receipt of a Staffing and Resource Plan. When an objection is stated, the contractor or retained legal counsel must either revise the Staffing and Resource Plan to satisfy the objection within 30 days or file a letter with the General Counsel disputing the objection.

(c) Contractors must require retained legal counsel to update Staffing and Resource Plans annually or more frequently if there are significant changes in the matter. The contractor must submit the Staffing and Resource Plan updates to Department Counsel. Similarly, Department retained legal counsel must submit to Department Counsel annual Staffing and Resource Plan updates or more frequent updates if there are significant changes in the matter.

§ 719.17 Are there any budgetary requirements?

(a) Contractors required to submit a Legal Management Plan must also submit an annual legal budget to Department Counsel.

(b) The annual legal budget must include cost projections for significant matters at a level of detail reflective of the types of billable activities and the stage of each such matter.

(c) For informational purposes for both the contractor and Department Counsel, the contractor must submit a report to Department Counsel comparing its budgeted and actual legal costs within 30 days of the conclusion of the period covered by each annual legal budget. The Department recognizes, however, that there may be departures from the annual budget beyond the control of the contractor.

Subpart C Engagement Letter

§ 719.20 When must an engagement letter be submitted to Department Counsel?

Contractors must submit a copy of an executed engagement letter between it and retained legal counsel to Department Counsel when the retained counsel is expected to provide $25,000 or more in legal services for a particular matter. A copy of the executed engagement letter must be submitted to Department Counsel upon execution.

§ 719.21 What are the required elements of an engagement letter?

(a) The engagement letter must require retained legal counsel to assist the contractor in complying with this part and any supplemental guidance distributed under this part.

(b) At a minimum, the engagement letter must include the following:

(1) A process for review and documented approval of all billing by a contractor representative including the timing and scope of billing reviews.

(2) A statement that provision of records to the Government is not intended to constitute a waiver of any applicable legal privilege, protection, or immunity with respect to disclosure of these records to third parties. An exemption for specific records may be obtained where contractors can demonstrate that a particular situation may provide grounds for a waiver.

(3) A requirement that the contractor, the Department, and the Government Accountability Office have the right, upon request, and at reasonable times and locations to inspect, copy, and audit all records documenting billable fees and costs.

(4) A statement that all records must be retained for a period of six (6) years and three (3) months after the final payment or after final case disposition, whichever is later.

(5) Identification of all attorneys and staff who are assigned to the matter and the rate and basis of their compensation (i.e., hourly rates, fixed fees, contingency arrangement) and a process for obtaining approval of temporary adjustments in staffing levels or identified attorneys.

(6) An initial assessment of the matter by retained legal counsel, along with a commitment to provide updates as necessary.

(7) A description of billing procedures, including frequency of billing and billing statement format.

(8) A statement setting forth an agreement that the retained legal counsel will prepare a Staffing and Resource Plan in accordance with the requirements of § 719.15.

(9) A statement setting forth an agreement to consider alternative dispute resolution at the earliest possible stage and thereafter as appropriate where litigation is involved.

(10) A statement setting forth an agreement that retained legal counsel must comply with the cost guidelines in subpart E of this part.

(11) A statement setting forth an agreement that retained legal counsel will provide a certification concerning the costs submitted for reimbursement. The certification that must be included in bills or invoices submitted by retained legal counsel must appear as follows: “Under penalty of law, [the representative] acknowledges the expectation that the bill will be paid by the contractor and that the contractor will be reimbursed by the Federal Government through the U.S. Department of Energy, and, based on personal knowledge and a good faith belief, certifies that the bill is truthful and accurate, and that the services and charges set forth herein comply with the terms of engagement and the policies set forth in the Department of Energy's regulation and guidance on contractor legal management requirements, and that the costs and charges set forth herein are appropriate and related to the representation of the client.” The certification must be signed and dated by a representative of the retained legal counsel. Invoices must contain all elements (e.g., date of service, description of service, name of attorney, etc.) set forth in the model bill format in Appendix A to this part.

(12) A statement setting forth agreement to identify and address promptly any professional conflicts of interest.

(c) There may be additional requirements for an engagement letter based on the needs of the contractor or the Departmental element requiring the services of the Department retained legal counsel.

Subpart D Requests From Contractor Counsel To Initiate, Defend, and Settle Legal Matters

§ 719.30 In what circumstances may the contractor initiate litigation, including appeals from adverse decisions?

(a) The contractor must provide written notice to Department Counsel prior to initiating litigation or appealing from adverse decisions.

(b) The contractor may not initiate litigation for which it seeks reimbursement without prior written authorization of Department Counsel.

(c) The following information must be provided to Department Counsel by the contractor prior to initiating litigation or appealing an adverse decision:

(1) Identification of the proposed parties;

(2) The nature of the proposed action;

(3) Relief sought;

(4) Venue;

(5) Proposed representation and reason for selection;

(6) An analysis of the issues and the likelihood of success, and any time limitation associated with the requested approval;

(7) The estimated costs associated with the proposed action, including whether outside counsel has agreed to a contingent fee arrangement;

(8) Whether, for any reason, the contractor will assume any part of the costs of the action;

(9) A description of any attempts to resolve the issues that would be the subject of the litigation, such as through mediation or other means of alternative dispute resolution; and

(10) A discussion regarding why initiating litigation would prove beneficial to the contractor and to the Department.

§ 719.31 When must the contractor initiate litigation against third parties?

The contractor must initiate litigation, upon the request of the contracting officer, against third parties including proceedings before administrative agencies, in connection with the contract. The contractor shall proceed with such litigation in good faith and as directed from time to time by Department Counsel.

§ 719.32 What must the contractor do when it receives notice that it is a party to litigation?

(a) The contractor shall give the contracting officer and Department Counsel immediate notice in writing of any legal proceeding, including any proceeding before an administrative agency and any claim which will be handled by a retrospective insurance carrier if costs (including Legal costs, settlements, claims paid, damages, etc.) are likely to be $100,000 or more, filed against the contractor arising out of the performance of the contract and shall provide a copy of all relevant filings and any other documents that may be requested by the contracting officer and/or Department Counsel. The Department Counsel will direct the contractor as to:

(1) Whether the contractor must authorize the Government to defend the action;

(2) Whether the Government will take charge of the action; or

(3) Whether the Government must receive an assignment of the contractor's rights.

(b) The contractor shall proceed with such litigation in good faith and as directed from time to time by the Department Counsel.

(c) If the costs and expenses associated with the legal proceeding against the contractor are potentially allowable under the contract, the contractor shall:

(1) Authorize Department representatives to collaborate with contractor in-house counsel or Department Counsel-approved outside counsel in settling or defending the legal proceeding; or counsel for any associated insurance carrier in settling or defending the claim if retrospective insurance applies or the amount of liability claimed exceeds the amount of insurance coverage; and

(2) Authorize Department representatives to settle the legal proceeding or to defend or represent the contractor in and/or to take charge of any litigation, if required by the Department, except where the liability is covered by bond or is insured by an insurance policy other than retrospective insurance.

§ 719.33 In what circumstances must the contractor seek permission from the Department to enter a settlement agreement?

The contractor must obtain permission from Department Counsel to enter a settlement agreement if the settlement agreement requires contractor payment of $25,000 or more. Obtaining this approval does not represent a determination that the settlement amount and/or the legal costs incurred in connection with the underlying legal matter will be determined to be allowable.

§ 719.34 What documentation must the contractor provide to Department Counsel when it seeks permission to enter a settlement agreement?

The contractor must provide a written statement to the Department Counsel that includes the following information, as applicable:

(a) The amount of any proposed monetary settlement payment.

(b) Titles and docket numbers associated with the case(s) for which the contractor is seeking approval to settle;

(c) The procedural history of the case(s) or issue(s);

(d) A narrative description of the legal claims or allegations at issue in the matter and any background information that explains events that precipitated the initiation of the matter;

(e) A description of the history of the settlement discussions;

(f) A description of the terms of the proposed settlement agreement or requested settlement authority and the rationale for the contractor entering into the proposed agreement;

(g) If the proposed total monetary settlement amount would be allocated among multiple plaintiffs, a list of the plaintiffs and the amount of money each would receive pursuant to the proposed settlement agreement as well as an explanation as to why the settlement amount is different for any particular plaintiff, if appropriate;

(h) A description as to why settlement of the matter is in the best interest of the Department; and

(i) Any additional supporting documents requested by Department Counsel.

§ 719.35 When must the contractor provide a copy of an executed settlement agreement?

A contractor must provide a copy of an executed settlement agreement within seven (7) days of execution.

Subpart E Reimbursement of Costs Subject to This Part

§ 719.40 What effect do the regulations of this part have on cost allowability?

Contractor and retained legal counsel compliance with this part is a prerequisite for allowability of legal costs. However, compliance with this part does not guarantee that legal costs will be determined to be allowable. Only the contracting officer has the authority to determine allowability of costs in accordance with 48 CFR (FAR) part 31 and (DEAR) part 931 and all other applicable contract terms and conditions.

§ 719.41 How does the Department determine whether fees are reasonable?

In determining whether fees or rates charged by retained legal counsel are reasonable, the Department may consider among other things:

(a) Whether the lowest reasonably achievable fees or rates (including any currently available or negotiable discounts) were obtained from retained legal counsel;

(b) Whether lower rates from other firms providing comparable services, at appropriate competency and experience levels, were available;

(c) Whether alternative rate structures such as flat, contingent, and other innovative proposals, were considered; and

(d) The complexity of the legal matter and the expertise of the law firm in this area.

§ 719.42 What categories of costs are unallowable?

(a) Specific categories of unallowable costs are contained in the cost principles at 48 CFR (FAR) part 31 and 48 CFR (DEAR) part 931 and 48 CFR 970.31. See also 41 U.S.C. 4304.

(b) Costs that are customarily or already included in billed hourly rates are not separately reimbursable.

(c) Interest charges that a contractor incurs on any outstanding (unpaid) bills from retained legal counsel are not reimbursable.

§ 719.43 What is the treatment of travel costs?

(a) Travel and related expenses must at a minimum comply with the restrictions set forth in 48 CFR 31.205-46, or 48 CFR (DEAR) 970.3102-05-46, as appropriate, to be reimbursable.

(b) Travel time may be allowed at a full hourly rate for the portion of time during which retained legal counsel performs legal work for which it was retained; any remaining travel time shall be reimbursed at 50 percent of the full hourly rate, except that in no event will travel time spent working for other clients be allowable. Also, for long distance travel that could be completed by various methods of transportation, e.g., car, train, or plane, costs charged by retained legal counsel or any agent of retained legal counsel will be considered reasonable only if the individuals charge no more travel time than it would take to utilize the fastest mode of transportation that is cost-effective. For example, if retained legal counsel travels for 10 hours by train when a cost-effective flight that would take two hours to get to the same destination is available, the attorney may charge a maximum of two hours for the time spent traveling.

§ 719.44 What categories of costs require advance approval?

(a) To be considered for reimbursement, costs incurred by retained legal counsel for the following require advance written approval from Department Counsel or the submission of subsequent specific justification to Department Counsel when circumstances out of the contractor's control make advance approval unobtainable:

(1) Computers or general application software, or non-routine computerized databases, if they are specifically created for a particular matter. For costs associated with the creation and use of computerized databases, contractors and retained legal counsel must ensure that the creation and use of computerized databases is necessary and cost-effective. Use of databases originally created by the Department or its contractors for other purposes, but that can be used to assist a contractor or retained legal counsel in connection with a particular matter, should be considered. Contractors and retained legal counsel must ensure that DOE is provided the discretion to obtain unlimited access to and dominion over any computers or general application software, or non-routine computerized databases specifically created for a particular matter;

(2) Secretarial and support services, word processing, or temporary support personnel;

(3) Attendance by more than one attorney at a deposition, court hearing or interview;

(4) Expert witnesses and consultants;

(5) Trade publications, books, treatises, background materials, and other similar documents;

(6) Professional or educational seminars and conferences;

(7) Preparation of bills or time spent responding to questions about bills from either the Department or the contractor;

(8) Food and beverages when the attorney or consultant is not on travel status and away from the home office;

(9) Pro hac vice admissions; and

(10) Time charged for law students' or interns' services.

(b) Requests for fee increases by retained legal counsel, other than those under contract directly with the Department, must be sent in writing to the contractor, who will review the request for reasonableness. If the contractor determines the request is reasonable, the contractor must seek approval for the increase from Department Counsel before it authorizes any increase. Contractors should attempt to lock in rates for partners, associates and paralegals for at least a two year period.

§ 719.45 Are there any special procedures or requirements regarding subcontractor and retrospective insurance carrier legal costs?

(a) The contractor shall establish a monitoring system for significant matters in litigation which are handled by subcontractors other than retrospective insurance carriers whose contracts provide for the reimbursement of legal costs. The purpose of this monitoring system is to enable the contractor to be regularly informed of the progress of the Significant Matter, to monitor the associated costs and help ensure that they are reasonable, and to report on the progress of the Significant Matter and the associated costs to Department Counsel.

(b) The contractor shall require retrospective insurance carriers and other subcontractors whose contracts provide for the reimbursement of legal costs to request prior permission from the contractor to enter into a settlement agreement with, or make any payments to, claimants or third-parties if:

(1) In the case of a subcontractor other than a retrospective insurance carrier, the settlement or payment amount is likely to reach $25,000 or more; or

(2) In the case of a retrospective insurance carrier, the settlement or payment amount is likely to reach $100,000 or more.

(c) The contractor shall require the insurance carrier or other subcontractor to submit all documentation described in § 719.34 and to provide the contractor with a copy of the executed settlement agreement within seven days of execution, which the contractor will promptly forward to Department Counsel. The contractor shall not authorize the subcontractor to enter into a settlement agreement or make a payment to a claimant or third-party that is likely to reach or exceed the above-stated threshold amounts without first obtaining the approval of the Department Counsel.

(d) Upon request from Department Counsel, the Contracting Officer, or other authorized representative of the Department, the contractor shall provide detailed cost information regarding particular legal matters handled by retrospective insurance carriers or other subcontractors whose contracts provide for the reimbursement of legal costs.

(e) The contractor shall provide reviewed costs and status updates for all significant matters in litigation handled by subcontractors whose contracts provide for the reimbursement of legal costs in accordance with § 719.51. The contractor is not required to provide cost and status updates for matters handled by retrospective insurance carriers except upon the written request of the cognizant Contracting Officer or Department Counsel.

§ 719.46 Are costs covered by this part subject to audit?

All costs covered by this part are subject to audit by the Department, its designated representative, or the Government Accountability Office. See § 719.21.

§ 719.47 What happens when more than one contractor is a party to a matter?

(a) If more than one contractor is a party in a particular matter and the issues involved are similar for all the contractors, a single legal counsel designated by the General Counsel must either represent all of the contractors or serve as lead counsel, when the rights of the contractors and the Government can be effectively represented by a single legal counsel, consistent with the standards for professional conduct applicable in the particular matter. Contractors may propose to the General Counsel their preference for the individual or law firm to perform as the lead counsel for a particular matter.

(b) If a contractor, having been afforded an opportunity to present its views concerning joint or lead representation, does not acquiesce in the designation of one retained legal counsel to represent a number of contractors, or serve as lead counsel, then the legal costs of such contractor are not reimbursable by the Department, unless the contractor demonstrates that it was reasonable for the contractor to incur such expenses.

Subpart F Department Counsel

§ 719.50 What authority does Department Counsel have?

(a) Department Counsel will receive written delegated authority from the contracting officer to serve as the contracting officer's representative for legal matters.

(b) Actions by Department Counsel may not exceed the responsibilities and limitations as delegated by the contracting officer. Delegated contracting officer representative authority shall not be construed to include the authority to execute or modify the contract or resolve any contract dispute arising under the contract. Additional discussion of the authority and limitation of contracting officers can be found at 48 CFR 1.602-1, and contracting officer's representatives at 48 CFR (DEAR) 942.270-1. The clause, Technical Direction, 48 CFR (DEAR) 952.242-70, also discusses the responsibilities and authority of a contracting officer's representative.

§ 719.51 What information must be forwarded to the General Counsel's Office concerning contractor submissions to Department Counsel under this part?

Department Counsel must submit through the General Counsel reporting system, the reviewed costs and status updates for all matters involving retained counsel, including but not limited to contractor litigation. The reports are to be received by the 15th day of the month following the end of each quarter of the fiscal year.

§ 719.52 What types of field actions must be coordinated with the General Counsel?

(a) Requests from contractors for exceptions or deviations from this part must be submitted to the contracting officer and Department Counsel, and approved by the General Counsel or his/her delegee.

(b) Requests from contractors for approval to initiate or defend litigation, or to appeal from adverse decisions, where legal issues of first impression, sensitive issues, issues of national significance to the Department or of broad applicability to the Government that might adversely impact its operations are involved must be coordinated by Department Counsel with the General Counsel or his/her delegee.

(c) Department Counsel must inform the General Counsel of any Significant Matter, as defined in this part, and must coordinate any action involving a Significant Matter with the General Counsel, or his/her delegee, as directed by the General Counsel or his/her delegee.

Appendix A to Part 719 Guidance for Legal Resource Management

Management and Administration of Outside Legal Services

1.0 Alternative Dispute Resolution

2.0 Cost Allowability Issues

2.1 Underlying Cause for Incurrence of Costs

Attachment—Contractor Litigation and Legal Costs, Model Bill Format

Management and Administration of Outside Legal Services

This guidance is intended to assist contractors, contracting officers and retained legal counsel in managing the costs of outside legal services.

1.0 Alternative Dispute Resolution

Contractors are expected to evaluate all matters for appropriate alternative dispute resolution (ADR) at various stages of an issue in dispute, e.g., before a case is filed, during pre-discovery, after initial discovery and during pretrial. This evaluation should be done in coordination with the Department's ADR liaison if one has been established or appointed or Department Counsel if an ADR liaison has not been appointed. Contractors, contractor counsel, and Department Counsel are also encouraged to consult with the Department's Director of the Office of Conflict Prevention and Resolution. The Department anticipates that mediation will be the principal and most common method of alternative dispute resolution. Agreement to arbitrate should generally be consistent with the Administrative Dispute Resolution Act (incorporated in part at 5 U.S.C. 571, et seq.) and Department guidance issued under that Act. When a decision to arbitrate is made, a statement fixing the maximum award amount should be agreed to in advance by the participants.

2.0 Cost Allowability Issues

A determination of cost reasonableness depends on a variety of considerations and circumstances. 48 CFR 31.201-3 establishes that no presumption of reasonableness is attached to the incurrence of costs by a contractor.

2.1 Underlying Cause for Incurrence of Costs

While 10 CFR part 719 provides procedures associated with incurring and monitoring legal costs, the evaluation of the reason for the incurrence of the legal costs, e.g., liability, fault or avoidability, is a separate issue. The reason for the contractor incurring costs may affect the allowability of the contractor's legal costs. In some cases, the final determination of allowability of legal costs cannot be made until a matter is fully resolved. In certain circumstances, contract and cost principle language may permit conditional reimbursement of costs pending the outcome of the legal matter. Whether the Department makes conditional reimbursements or withholds any payment pending the outcome, legal costs ultimately reimbursed by the Department must comply with the applicable cost principles, the terms of the contract, and part 719.

Attachment—Contractor Litigation and Legal Costs, Model Bill Format

1. Model Bill Format

I—For Fees

Date of service | Description of service | Name or initials of attorney | Approved rate | Time charged | Amount (rate × time)

(See Note 1 to this table).

II—For Disbursements

Date | Description of disbursement | Amount

(See Note 1 to this table).

Note 1—Description of Service:

All fees must be itemized and described in sufficient detail and specificity to reflect the purpose and nature of the work performed (e.g., subject matter researched or discussed; names of participants of calls/meetings; type of documents reviewed).

Note 2—Description of Disbursement:

Description should be in sufficient detail to determine that the disbursement expense was in accordance with all applicable Department policies on reimbursement of contractor legal costs and the terms of engagement between the contractor and the retained legal counsel. The date the expense was incurred or disbursed should be listed rather than the date the expense was processed. The following should be itemized: copy charge (i.e., number of pages times the price per page); fax charges (date, phone number and actual amount); overnight delivery (date and amount); electronic research (date and amount); extraordinary postage (e.g., bulk or certified mail); court reporters; expert witness fees; filing fees; outside copying or binding charges; temporary help (assuming prior approval).

Note 3—Receipts:

Receipts for all expenses equal to or above $75 must be attached.

PART 725 PERMITS FOR ACCESS TO RESTRICTED DATA

Authority: Sec. 161 of the Atomic Energy Act of 1954, as amended, 68 Stat. 943, 42 U.S.C. 2201.

Source: 41 FR 56778, Dec. 30, 1976, unless otherwise noted.

Editorial Note: Nomenclature changes to part 725 appear at 88 FR 41292, June 26, 2023.

9 General Provisions

§ 725.1 Purpose.

This part establishes procedures and standards for the issuance of an Access Permit to any person subject to this part who requires access to Restricted Data applicable to civil uses of atomic energy for use in his business, trade or profession; provides for the amendment, renewal, suspension, termination and revocation of an Access Permit; and specifies the terms and conditions under which the Director, Office of Environment, Health, Safety and Security will issue the Permit.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.2 Applicability.

The regulations in this part apply to any person within or under the jurisdiction of the United States who desires access to Restricted Data for use in his business, profession or trade.

§ 725.3 Definitions.

As used in this part:

(a) Access Permit means a permit, issued by the Administrator authorizing access by the named permittee to Restricted Data applicable to civil uses of atomic energy in accordance with the terms and conditions stated on the permit.

(b) Act means the Atomic Energy Act of 1954 (68 Stat. 919), including any amendments thereto.

(c) Category means a category of Restricted Data designated in appendix A to the regulations in this part.

(d) Director of the Office of Environment, Health, Safety and Security means the DOE official to whom the Secretary assigns the authority to develop policy and technical assistance; safety analysis; and organizational safety and security programs, or the Director's duly authorized representatives.

(e) DOE means the Department of Energy.

(f) Permittee means the holder of a permit issued pursuant to the regulations in this part.

(g) Person means (1) any individual, corporation, partnership, firm, association, trust, estate, public or private institution, group, Government agency other than DOE, any state or any political subdivision of, or any political entity within a state, or other entity; and (2) any legal successor, representative, agent, or agency of the foregoing.

(h) Restricted Data means all data concerning (1) design, manufacture or utilization of atomic weapons; (2) the production of special nuclear material; or (3) the use of special nuclear material in the production of energy, but shall not include data declassified or removed from the Restricted Data category pursuant to section 142 of the Act.

(i) Government Confidential Commercial Information means sensitive commercial information not including Restricted Data, generated by the government, the release of which could put the government at a competitive disadvantage in providing enrichment services.

[41 FR 56778, Dec. 30, 1976, as amended at 52 FR 30139, Aug. 13, 1987; 71 FR 68732, Nov. 28, 2006; 88 FR 41293, June 26, 2023]

§ 725.4 Interpretations.

Except as specifically authorized by the Director, Office of Environment, Health, Safety and Security in writing no interpretation of the meaning of the regulations in this part by any officer or employee of DOE other than a written interpretation by the General Counsel will be recognized to be binding upon DOE.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.5 Communications.

All communications concerning this part should be addressed to the Director, Office of Environment, Health, Safety and Security, EHSS-1, U.S. Department of Energy, 1000 Independence Ave, SW., Washington, DC 20585.

[71 FR 68732, Nov. 28, 2006, as amended at 88 FR 41293, June 26, 2023]

§ 725.6 Categories of available information.

For administrative purposes DOE has categorized Restricted Data which will be made available to permittees in the categories as set forth in appendix A to this part. Top Secret information; information pertaining to the design, manufacture or utilization of atomic weapons; and defense information other than Restricted Data are not included in these categories and will not be made available under this part.

§ 725.7 Specific waivers.

The Director, Office of Environment, Health, Safety and Security may, upon application of any interested party, grant such waivers from the requirements of this part as he determines are authorized by law and will not constitute an undue risk to the common defense and security.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

10 Applications

§ 725.11 Applications.

(a) Any person desiring access to Restricted Data pursuant to this part should submit an application (Form 378), in triplicate, for an access permit to the Director, Office of Environment, Health, Safety and Security, EHSS-1, U.S. Department of Energy, 1000 Independence Ave, SW., Washington, DC 20585.

(b) Where an individual desires access to Restricted Data for use in the performance of his duties as an employee, the application for an access permit must be filed in the name of his employer.

(c) Self-employed private consultants, desiring access to Restricted Data, must file the application in their own name for an individual access permit.

(d) Each application should contain the following information:

(1) Name of applicant (unincorporated subsidiaries or divisions of a corporation must apply in the name of the corporation);

(2) Address of applicant;

(3) Description of business or occupation of applicant; and

(4)(i) If applicant is an individual, state citizenship.

(ii) If applicant is a partnership, state name, citizenship and address of each partner and the principal location where the partnership does business.

(iii) If applicant is a corporation or an unincorporated association, state:

(A) The state where it is incorporated or organized and the principal location where it does business;

(B) The names, addresses and citizenship of its directors and of its principal officers;

(C) Whether it is owned, controlled or dominated by an alien, a foreign corporation, or foreign government, and if so, give details.

(iv) If the applicant is acting as agent or representative of another person in filing the application, identify the principal and furnish information required under this subparagraph with respect to such principal;

(5) Total number of full-time employees;

(6) Classification of Restricted Data (Confidential or Secret) to which access is requested;

(7) Potential use of the Restricted Data in the applicant's business, profession or trade. If access to Secret Restricted Data is requested, list the specific categories by number and furnish detailed reasons why such access within the specified categories is needed by the applicant. The need for Secret information should be stated by describing its proposed use in specific research, design, planning, construction, manufacturing, or operating projects; in activities under licenses issued by Nuclear Regulatory Commission; in studies or evaluations planned or under way; or in work or services to be performed for other organizations. In addition, if access to secret restricted data in category C-65, plutonium production, or restricted data in category C-24, isotope separation, is requested, the application should also include sufficient information to satisfy the requirements of § 725.15(b) (2) or (3), as the case may be.”

(8) Principal Location(s) at which Restricted Data will be used.

(e) Applications should be signed by a person authorized to sign for the applicant.

(f) Each application shall contain complete and accurate disclosure with respect to the real party or parties in interest and as to all other matters and things required to be disclosed.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41293, June 26, 2023]

§ 725.12 Noneligibility.

The following persons are not eligible to apply for an access permit:

(a) Corporations not organized under the laws of the United States or a political subdivision thereof.

(b) Any individual who is not a citizen of the United States.

(c) Any partnership not including among the partners one or more citizens of the United States; or any other unincorporated association not including one or more citizens of the United States among its principal officers.

(d) Any organization which is owned, controlled or dominated by the Government of, a citizen of, or an organization organized under the laws of a country or area listed as a Subgroup A country or destination in § 371.3 (15 CFR 371.3) of the Comprehensive Export Schedule of the United States Department of Commerce.

(e) Persons subject to the jurisdiction of the United States who are not doing business within the United States.

§ 725.13 Additional information.

The Director, Office of Environment, Health, Safety and Security may, at any time after the filing of the original application and before the termination of the permit, require additional information in order to enable the Director, Office of Environment, Health, Safety and Security to determine whether the permit should be granted or denied or whether it should be modified or revoked.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.14 Public inspection of applications.

Applications and documents submitted to DOE in connection with applications may be made available for public inspection in accordance with the regulations contained in part 702 of this chapter.

§ 725.15 Requirements for approval of applications.

(a) An application for an access permit authorizing access to confidential restricted data in the categories set forth in appendix A of this part (except C-91 and C-24) will be approved only if the application demonstrates that the applicant has a potential use or application for such data in his business, trade, or profession and has filed a complete application form.

(b)(1) An application for an access permit authorizing access to restricted data in category C-24 or secret restricted data in other categories will be approved only if the applicant has a need for such data in his business, trade, or profession and has filed a complete application form.

(2) An application for an access permit authorizing access to Secret Restricted Data in category C-65 Plutonium Production will be approved only if the application demonstrates also that the applicant:

(i) Is directly engaged in a substantial effort to develop, design, build or operate a chemical processing plant or other facility related to his participation in the peaceful uses of atomic energy for which such production rate and cost data are needed; or

(ii) Is furnishing to a permittee having access to C-65 under paragraph (b)(2)(i) of this section, substantial scientific, engineering or other professional services to be used by said permittee in carrying out the activities for which said permittee received access to category C-65.

(3) An application for an access permit authorizing access to Restricted Data in category C-24, isotope separation—subcategory A or B—will be approved only if the application demonstrates also that the applicant:

(i) Possesses technical, managerial and financial qualifications demonstrating that the applicant is potentially capable of undertaking or participating significantly in the construction and/or operation of production or manufacturing facilities and offers reasonable assurance of adequacy of resources to carry on, alone or with others, uranium enrichment on a production basis or the large-scale manufacture or assembly of precision equipment systems, or is potentially capable of utilizing centrifuge machines in its business for uranium enrichment or for purposes other than uranium enrichment; and is not subject to foreign ownership, control, or influence; and

(A) For subcategory A, desires to determine its interest in participating significantly in a substantial effort to develop, design, build, and operate a uranium enrichment facility or a facility for the manufacture of uranium enrichment equipment.

(B) For subcategory B, proposes to (1) participate significantly in, or is directly participating significantly in, a substantial effort to evaluate alternative processes, develop, design, build, and operate a uranium enrichment facility or a facility for the manufacture of uranium enrichment equipment, or (2) utilize centrifuge machines and related equipment in its business for uranium enrichment or for purposes other than uranium enrichment, or

(ii) Is furnishing to a permittee having access to Category C-24 under the paragraph (b)(3)(i) of this section substantial scientific, engineering, or other professional services to be used by said permittee in carrying out the activities for which said permittee received access to Category C-24.

(4) An application for an access permit authorizing access to Confidential and Secret Restricted Data in C-91, Nuclear Reactors for Rocket Propulsion, will be approved only if the application demonstrates also that the applicant:

(i) Possesses qualifications demonstrating that he is capable of making a contribution to research and development in the field of nuclear reactors for rocket propulsion and is directly engaged in or proposes to engage in a substantial research and development program in such field of work; or

(ii) Is engaged in or proposes to engage in a substantial study program in the field of nuclear reactors for rocket propulsion preparatory to the submission of a research and development proposal to DOE; or

(iii) Is furnishing to a permittee having access under paragraph (b)(4) (i) or (ii) of this section substantial scientific, engineering or other professional services to be used by that permittee in a study or research and development program for which said permittee received access.

[41 FR 56778, Dec. 30, 1976, as amended at 52 FR 30139, Aug. 13, 1987]

11 Permits

§ 725.21 Issuance.

(a) Upon a determination that an application meets the requirements of this regulation, the Director, Office of Environment, Health, Safety and Security will issue to the applicant an access permit on Form DOE 379.

(b) An Access Permit is not an access authorization. It does not authorize any individual not having an appropriate DOE access authorization to receive Restricted Data. See § 725.24 and part 1016 of this title.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.22 Scope of permit.

(a) All access permits will as a minimum authorize access, subject to the terms and conditions of the access permit to confidential restricted data in all of the categories set forth in appendix A to this part, except C-91 and C-24.

(b) In addition, access permits may authorize access, subject to the terms and conditions of the access permit to such Secret Restricted Data as is included within the particular category or categories specified in the permit.

(c) In addition, access permits may authorize access, subject to the terms and conditions of the access permit, to such government confidential commercial information as is included within the particular category or categories specified in the permit.

[41 FR 56778, Dec. 30, 1976, as amended at 52 FR 30139, Aug. 13, 1987]

§ 725.23 Terms and conditions of access.

(a) Neither the United States, nor DOE, nor any person acting on behalf of DOE makes any warranty or other representation, expressed or implied, (1) with respect to the accuracy, completeness or usefulness of any information made available pursuant to an access permit, or (2) that the use of any such information may not infringe privately owned rights.

(b) The Director, Office of Environment, Health, Safety and Security, on behalf of DOE, hereby waives such rights with respect to any invention or discovery as it may have pursuant to section 152 of the Act by reason of such invention or discovery having been made or conceived in the course of, in connection with, or resulting from access to Restricted Data received under the terms of an access permit. (Note provisions of § 725.23(d).)

(c) Each permittee shall:

(1) Comply with all applicable provisions of the Atomic Energy Act of 1954, as amended, and with parts 810 and 1016 of this title and with all other applicable rules, regulations, and orders of DOE, including such rules, regulations, and orders as DOE may adopt or issue to effectuate the policies specified in the act directing DOE to strengthen free competition in private enterprise and avoid the creation or maintenance of a situation inconsistent with the antitrust laws.

(2) Be deemed to have waived all claims for damages under section 183 of title 35 U.S. Code by reason of the imposition of any secrecy order on any patent application and all claims for just compensation under section 173 of the Atomic Energy Act of 1954, with respect to any invention or discovery made or conceived in the course of, in connection with or as a result of access to Restricted Data received under the terms of the access permit;

(3) Be deemed to have waived any and all claims against the United States, DOE and all persons acting on behalf of DOE that might arise in connection with the use, by the applicant, of any and all information supplied by them pursuant to the access permit;

(4) Obtain and preserve in his files written agreements from all individuals who will have access to Restricted Data under his access permit. The agreement shall be as follows:

In consideration for receiving access to Restricted Data under the access permit issued by the Director, Office of Environment, Health, Safety and Security, I hereby agree to:

(a) Waive all claims for damages under section 183 of title 35 U.S. Code by reason of the imposition of any secrecy order on any patent application, and all claims for just compensation under section 173 of the Atomic Energy Act of 1954, with respect to any invention or discovery made or conceived in the course of, in connection with or resulting from access to Restricted Data received under the terms of the access permit issued to (insert the name of the holder of the access permit);

(b) Waive any and all claims against the United States, DOE, and all persons acting on behalf of DOE that might arise in connection with the use, by me, of any and all information supplied by them pursuant to the access permit issued to (insert the name of the holder of the access permit).

In case of an access permit authorizing access to restricted data in category C-24, isotope separation, the agreement shall also provide for such requirements as the permittee considers necessary for purposes of fulfilling its obligations under paragraph (d) of this section.

(5) Pay all established charges for personnel access authorizations, DOE consulting services, publication and reproduction of documents, and such other services as DOE may furnish in connection with the access permit.

(d) The following terms and conditions are applicable to an access permit authorizing access to restricted data in category C-24, isotope separation irrespective of whether access to DOE's restricted data information is desired:

(1) The permittee agrees to grant a nonexclusive license at reasonable royalties to the United States and, at the request of DOE, to domestic and foreign persons, to use in the production or enrichment of special nuclear material any U.S. patent or any U.S. patent application (otherwise in condition for allowance except for a secrecy order thereon) on any invention or discovery made or conceived by the permittee, its employees, or others engaged by the permittee in the course of the permittee's work under the access permit, or as a result of access to data or information made available by DOE.

(2) The permittee agrees to grant to the United States, and, at the request of DOE, to domestic and foreign persons, the right at reasonable royalties to use for research, development, or manufacturing programs for the production or enrichment of special nuclear material, any technical information or data, including economic evaluations thereof, of a proprietary nature developed by the permittee, its employees, or others engaged by the permittee in the course of the permittee's work under the access permit or as a result of access to data or information made available by DOE and not covered by a U.S. patent or U.S. patent application referred to in paragraph (d)(1) of this section. If DOE disseminates any such proprietary technical information or data in its possession to any of its contractors for use in any DOE research, development, production, or manufacturing programs, it will do so under contractual provisions pursuant to which the contractor would undertake to use this information only for the work under the pertinent DOE contract. Notwithstanding the foregoing provisions of this subparagraph, the permittee waives any claim against DOE for compensation or otherwise, in connection with any use or dissemination of information or data not specifically identified and claimed by the permittee as proprietary in a written notice to DOE at the time of the furnishing of the information or data to DOE. As used in this subparagraph, the term “technical information or data, including economic evaluations thereof, of a proprietary nature” means information or data which:

(i) Is not the property of the Government by virtue of any agreement;

(ii) Concerns the details of trade secrets or manufacturing processes which the permittee has protected from us by others; and

(iii)(A) Is specifically identified as proprietary at the time it is made available to DOE.

(B) Technical information or data shall not be deemed proprietary in nature whenever substantially the same technical information is available to DOE which has been prepared, developed or furnished as nonproprietary information by another source independently of the proprietary information and data furnished by the permittee.

(3) If the amount of reasonable royalties provided for in paragraphs (d) (1) and (2) of this section cannot be agreed upon, the permittee agrees that such amount shall be determined by the Administrator under the provisions of section 157c of the Atomic Energy Act of 1954, as amended.

(4) In the event domestic commercial uranium enriching services are provided by persons other than an agency of the United States, the permittee agrees not to require the United States to pay the royalties provided for in paragraphs (d) (1) and (2) of this section.

(5) The acceptance, exercise, or use of the licenses or rights provided for in paragraphs (d) (1) and (2) of this section shall not prevent the Government, at any time, from contesting their validity, scope or enforceability.

(6) The permittee agrees, during the term of the access permit, to make quarterly reports to DOE in writing, in reasonable detail, respecting all technical information or data, including economic evaluations thereof, which the permittee or DOE considers may be of interest to DOE, including reports of patent applications on inventions or discoveries and of technical information and data of a proprietary nature. These reports will cover the results of the permittee's work under the access permit or as a result of data or information made available by DOE. The foregoing provisions of this subparagraph shall be subject to the provisions of paragraphs (d) (1) and (2) of this section.

(7) The permittee agrees to make available to DOE, at all reasonable times during the term of the access permit, for inspection by DOE personnel, or by mutual agreement, others on behalf of DOE, all experimental equipment and technical information or data developed by the permittee, its employees, or others engaged by the permittee, in the course of the permittee's work under the access permit or as a result of data or information made available by DOE. The foregoing provision of this subparagraph shall be subject to the provisions of paragraphs (d) (1) and (2) of this section.

(8) The permittee agrees to pay such reasonable compensation as DOE may elect to charge for the commercial use of its inventions and discoveries including related data and technology and, except for an applicant qualifying for a permit pursuant to § 725.15(b)(3)(ii), agrees to pay $25,000 for an access permit authorizing access to restricted data in subcategory B.

(9) Except as may be otherwise authorized by DOE, the permittee agrees not to disseminate to persons not granted access by DOE, restricted data or government confidential commercial information made available to the permittee by DOE or restricted data developed by the permittee, its employees, or others engaged by the permittee in the course of the permittee's work under the access permit or as a result of data or information made available by DOE.

(10) The granting of an access permit does not constitute any assurance, direct or implied, that the Nuclear Regulatory Commission will grant the permittee a license for a production facility or any other license.

(11) In the event the permittee is engaged by DOE to perform work for DOE in the field of the separation of isotopes, the permittee agrees to undertake such measures as DOE may require for the separation of its activities under the access permit from its work for DOE.

[41 FR 56778, Dec. 30, 1976, as amended at 52 FR 30139, Aug. 13, 1987; 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.24 Administration.

With respect to each permit issued pursuant to the regulations in this part, the Director, Office of Environment, Health, Safety and Security will designate a DOE or National Nuclear Security Administration office which will:

(a) Process all personnel access authorizations requested in connection with the permit;

(b) Review the procedures submitted by the Applicant, in accordance with part 1016 of this title, for the safeguarding of Restricted Data; and

(c) Provide information to the permittee with respect to the sources and locations of Restricted Data available under this permit and to assist the permittee in other matters pertaining to the administration of his permit.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.25 Term and renewal.

(a) Each access permit will be issued for a two year term, unless otherwise stated in the permit.

(b) Applications for renewal shall be filed in accordance with § 725.11. Each renewal application must be complete, without reference to previous applications. In any case in which a permittee has filed a properly completed application for renewal more than thirty (30) days prior to the expiration of his existing permit, such existing permit shall not expire until the application for a renewal has been finally acted upon by the Director, Office of Environment, Health, Safety and Security.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.26 Assignment.

An access permit is nontransferable and nonassignable.

§ 725.27 Amendment.

An access permit may be amended from time to time upon application by the permittee. An application for amendment may be filed, in triplicate, in letter form and shall be signed by an individual authorized to sign on behalf of the applicant. The term of an access permit shall not be altered by an amendment thereto.

§ 725.28 Action on application to renew or amend.

In considering an application by a permittee to review or amend his permit, the Director, Office of Environment, Health, Safety and Security will apply the criteria set forth in § 725.15. Failure of an applicant to reply to an DOE request for additional information concerning an application for renewal or amendment within 60 days shall result in a rejection of the application without prejudice to resubmit a properly completed application at a later date.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.29 Suspension, revocation and termination of permits.

The Director, Office of Environment, Health, Safety and Security may revoke or suspend any access permit for any material false statement in the application or in any report submitted to DOE pursuant to the regulations in this part or because of conditions or facts which would have warranted a refusal to grant the permit in the first instance, or for violation of any of the terms and conditions of the Atomic Energy Act of 1954 or rules, regulations or orders issued pursuant thereto. A permittee should request termination of his permit when he no longer requires Restricted Data for use in his business, trade or profession.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.30 Exceptions and additional requirements.

Notwithstanding any other provision in the regulations in this part, the Director, Office of Environment, Health, Safety and Security may deny an application for an access permit or suspend or revoke any access permit, or incorporate additional conditions or requirements in any access permit, upon finding that such denial, revocation or the incorporation of such conditions and limitations is necessary or appropriate in the interest of the common defense and security or is otherwise in the public interest.

[41 FR 56778, Dec. 30, 1976, as amended at 71 FR 68732, Nov. 28, 2006; 88 FR 41292, June 26, 2023]

§ 725.31 Violations.

An injunction or other court order may be obtained prohibiting any violation of any provision of the Act or any regulation or order issued thereunder. Any person who willfully violates any provision of the Act or any regulation or order issued thereunder may be guilty of a crime and, upon conviction, may be punished by fine or imprisonment or both, as provided by law.

Appendix A to Part 725 Categories of Restricted Data Available

C-24 Isotope separation. This category is divided into subcategories A and B.

Subcategory A includes information in summary form concerning the status and potential of the gaseous diffusion and gas centrifuge processes for the separation of uranium isotopes.

Subcategory B includes information on the following:

a. Any aspect of separating one or more isotopes of uranium from a composition containing a mixture of isotopes of that element by the gas centrifuge or gaseous diffusion processes.

b. Design, construction, and operation of any plant, facility or device capable of separating by the gas centrifuge or gaseous diffusion processes one or more isotopes of uranium from a composition containing a mixture of isotopes of that element, including means and methods of transporting materials from one to another device.

C-44 Nuclear Technology. This category includes classified technical information concerning nuclear technology. It may contain information on the following:

a. Materials, including metals, ceramics, organic and inorganic compounds. Included are such technical areas as the technology and fabrication of fuel elements, corrosion studies, cladding techniques and radiation studies.

b. Chemistry, chemical engineering and radiochemistry of all the elements and their compounds. Included are techniques and processes of chemical separations, radioactive waste handling and feed material processing.

c. Reactor physics, engineering and technology including theory, design, criticality studies and operation of reactors, reactor systems and reactor components.

d. Reserved.

e. Lithium isotope separation technology. This subcategory includes classified technical information on the separation of lithium isotopes by using counter-current flows of lithium amalgam and aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design and operating conditions from which total production rates or design capacity of the lithium isotope separation plant (Colex) in Oak Ridge, Tennessee, can be inferred. In addition to the other requirements of this part, access permits for Restricted Data in this subcategory will be approved, provided the permittee:

1. Demonstrates that it is not a corporation or entity owned, controlled or dominated by an alien, a foreign corporation, or a foreign government, and

2. Agrees to insertion in his access permit of the terms and conditions:

(i) Set forth in paragraphs (a) and (b) of § 725.23 of this part;

(ii) Set forth in paragraph (c) of § 725.23 of this part, amended by deleting the phrase “category C-24, isotope separation,” and inserting in lieu thereof the phrase “subcategory C-44e, lithium isotope separation technology”;

(iii) Set forth in paragraph (d) of § 725.23 of this part, amended by:

(A) Deleting the phrases “production or enrichment of special nuclear material” and “separation of isotopes” wherever they appear, and inserting in lieu thereof the phrase “separation of isotopes of lithium”;

(B) Deleting the phrase “domestic commercial uranium enriching services are provided by,” and inserting in lieu thereof the phrase “domestic lithium isotope separation capacity becomes available to.”

This category does not include information which reveals or from which can be calculated actual or planned (as distinguished from design) capacities, production rates and unit costs for the plutonium production program.

C-65 Plutonium Production. This category includes information on reactor, fuel element and separations technology which reveals or from which can be calculated actual or planned (as distinguished from design) capacities, production rates and unit costs for the Hanford and Savannah River production facilities.

Technology which does not reveal or enable calculation of production rates and unit costs of Hanford or Savannah River production facilities is categorized in C-44 Nuclear Technology.

C-90 Nuclear Reactors for Ram-Jet Propulsion. This category includes information on:

a. Programs pertaining to the development of nuclear reactors for application to ram-jet propulsion systems including theory and/or design, test philosophy procedures and/or results.

b. Fabrication technology and evaluation of performance or characteristics of materials or components for such reactors.

c. Controls, control systems and instrumentation relating to the design or technology of such reactors.

d. Data pertaining to heat transfer, propellant kinetics or corrosion and erosion of materials under conditions of high temperature, high gas flows or other environmental conditions characteristic of ram-jet propulsion systems.

This category does not include information on:

a. Design details of weapons systems or nuclear warheads.

b. Military operational techniques or characteristics.

c. General aspects of nuclear ram-jet missiles, such as payload, aerodynamic characteristics, guidance systems, physical size, gross weight, thrust and information of this kind which is associated with utilization of a nuclear ram-jet propulsion system.

C-91 Nuclear Reactors for Rocket Propulsion. This category includes information on:

a. Programs pertaining to nuclear reactors for rocket propulsion, i.e., missile propulsion, theory and/design, test philosophy procedures and/or results.

b. Design, fabrication technology and evaluation of performance or characteristics of material, components, or subsystems or nuclear rocket reactors.

c. Controls, control systems and instrumentation relating to the design or technology of rocket reactor systems.

d. Data pertaining to heat transfer, propellant kinetics or corrosion and erosion of rocket reactor system materials under conditions of high temperature, high gas flows, or other environmental conditions characteristic of rocket reactors.

This category does not include information on:

a. Design details of weapons systems or nuclear warheads.

b. Military operational techniques or characteristics.

c. General aspects of payload and aerodynamic characteristics.

d. Design details and development, information of components and subsystems of the nuclear rocket engine other than that associated with the reactor system.

C-92 Systems for Nuclear Auxiliary Power (SNAP). This category includes information on:

a. Isotopic SNAP Program, including theory, design, research and development, fabrication, test procedures and results for the device, including power conversion device and the fuels used.

b. Reactor SNAP Program, including theory, design, research and development, fabrication, test procedures and results for the reactor, including the directly associated power conversion device when developed by DOE.

This category does not include that technical and scientific data developed under the SNAP Advanced Concept Program which should be reported in C-93.

C-93 Advanced Concepts for Future Application.

C-93a Reactor Experiments. This category includes classified technical information developed in the pursuit of work on new or advanced concepts of reactors or components which DOE considers essential to future growth or for general application to future generations of reactors. Classified information developed in the pursuit of work on the lithium cooled reactor experiment is an example of the type of information to be reported in this category, i.e., information resulting from an experimental reactor project or component development which may have many future applications but which is not currently being pursued to meet the specific needs of an approved requirement for which other information categories have been provided. For example, classified technical information developed in the pursuit of work on Naval, Ram-Jet or Rocket nuclear reactors would not be reported here but under their respective specific categories. This category will include classified technical information on the following:

a. Theory, design, and performance, either estimated or actual.

b. Design details, composition and performance characteristics of major components (e.g., fuel media, reflectors, moderators, heat exchangers, pressure shells or containment devices, control rods, conversion devices, instrumentation and shielding).

c. Material (metals, ceramics and compounds) development, alloying, cladding, corrosion, erosion, radiation studies and fabrication techniques.

d. Chemistry, including chemical engineering, processes and techniques. Reactor physics, engineering and criticality studies.

C-93b Conversion Devices. This category includes classified technical information developed in the pursuit of studies, designs, research and development, fabrication and operation of any energy conversion device to be used with nuclear energy sources which is not being applied to a specific system development project.

C-94 Military Compact Reactor (MCR). This category includes classified technical information on the actual or planned Military Compact Reactor and its components developed in the pursuit of studies, designs, research and development, fabrication, and operation of the reactor system or its components.

Examples of the areas of information included are:

a. Reactor core physics.

b. Fuel elements and fuel element components.

c. Moderator and reflector details.

d. Data on primary coolant system.

e. Radiation shield.

f. Controls and instrumentation.

This category does not include information on military operational characteristics or techniques.

[41 FR 56778, Dec. 30, 1976, as amended at 44 FR 37939, June 29, 1979]

PART 727 CONSENT FOR ACCESS TO INFORMATION ON DEPARTMENT OF ENERGY COMPUTERS

Authority: 42 U.S.C. 7101, et seq.; 42 U.S.C. 2011, et. seq.; 50 U.S.C. 2425, 2483; E.O. No. 12958, 60 FR 19825, 3 CFR, 1995 Comp., p. 333; and E.O. 12968, 60 FR 40245, 3 CFR, 1995 Comp., p. 391.

Source: 71 FR 40884, July 19, 2006, unless otherwise noted.

§ 727.1 What is the purpose and scope of this part?

(a) The purpose of this part is to establish minimum requirements applicable to each individual granted access to a DOE computer or to information on a DOE computer, including a requirement for written consent to access by an authorized investigative agency to any DOE computer used in the performance of the individual's duties during the term of that individual's employment and for a period of three years thereafter.

(b) Section 727.4 of this part also applies to any person who uses a DOE computer by sending an e-mail message to such a computer.

§ 727.2 What are the definitions of the terms used in this part?

For purposes of this part:

Authorized investigative agency means an agency authorized by law or regulation to conduct a counterintelligence investigation or investigations of persons who are proposed for access to classified information to ascertain whether such persons satisfy the criteria for obtaining and retaining access to such information.

Computer means desktop computers, portable computers, computer networks (including the DOE network and local area networks at or controlled by DOE organizations), network devices, automated information systems, or other related computer equipment owned by, leased, or operated on behalf of the DOE.

DOE means the Department of Energy, including the National Nuclear Security Administration.

DOE computer means any computer owned by, leased, or operated on behalf of the DOE.

Individual means an employee of DOE or a DOE contractor, or any other person who has been granted access to a DOE computer or to information on a DOE computer, and does not include a member of the public who sends an e-mail message to a DOE computer or who obtains information available to the public on DOE Web sites.

User means any person, including any individual or member of the public, who sends information to or receives information from a DOE computer.

§ 727.3 To whom does this part apply?

(a) This part applies to DOE employees, DOE contractors, DOE contractor and subcontractor employees, and any other individual who has been granted access to a DOE computer or to information on a DOE computer.

(b) Section 727.4 of this part also applies to any person who uses a DOE computer by sending an e-mail message to such computer.

§ 727.4 Is there any expectation of privacy applicable to a DOE computer?

Notwithstanding any other provision of law (including any provision of law enacted by the Electronic Communications Privacy Act of 1986), no user of a DOE computer shall have any expectation of privacy in the use of that DOE computer.

§ 727.5 What acknowledgment and consent is required for access to information on DOE computers?

An individual may not be granted access to information on a DOE computer unless:

(a) The individual has acknowledged in writing that the individual has no expectation of privacy in the use of a DOE computer; and

(b) The individual has consented in writing to permit access by an authorized investigative agency to any DOE computer used during the period of that individual's access to information on a DOE computer and for a period of three years thereafter.

§ 727.6 What are the obligations of a DOE contractor?

(a) A DOE contractor must ensure that neither its employees nor the employees of any of its subcontractors has access to information on a DOE computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or subcontractor employee that complies with the requirements of § 727.5 of this part.

(b) A DOE contractor must maintain a file of original written acknowledgments and consents executed by its employees and all subcontractors employees that comply with the requirements of § 727.5 of this part.

(c) Upon demand by the cognizant DOE contracting officer, a DOE contractor must provide an opportunity for a DOE official to inspect the file compiled under this section and to copy any portion of the file.

(d) If a DOE contractor violates the requirements of this section with regard to a DOE computer with Restricted Data or other classified information, then the DOE contractor may be assessed a civil penalty or a reduction in fee pursuant to section 234B of the Atomic Energy Act of 1954 (42 U.S.C. 2282b).

PART 733 ALLEGATIONS OF RESEARCH MISCONDUCT

Authority: 42 U.S.C. 2201; 7254; 7256; 7101 et seq.; 50 U.S.C. 2401 et seq.

Source: 70 FR 37014, June 28, 2005, unless otherwise noted.

§ 733.1 Purpose.

The purpose of this part is to set forth a general statement of policy on the treatment of allegations of research misconduct consistent with Federal Policy on Research Misconduct established by the White House Office of Science and Technology Policy on December 6, 2000 (65 FR 76260-76264).

§ 733.2 Scope.

This part applies to allegations of research misconduct with regard to scientific research conducted under a Department of Energy contract or an agreement.

§ 733.3 Definitions.

The following terms used in this part are defined as follows:

Contract is defined in 2 CFR 200.22.

DOE means the U.S. Department of Energy (including the National Nuclear Security Administration).

DOE Element means a major division of DOE, usually headed by a Presidential appointee, which has a delegation of authority to carry out activities by entering into contracts or financial assistance agreements.

Fabrication means making up data or results and recording or reporting them.

Falsification means manipulating research materials, equipment, or processes, or changing or omitting data or results such that the research is not accurately represented in the research record.

Financial assistance agreement means an agreement the primary purpose of which is to provide appropriated funds to stimulate an activity, including but not limited to, grants and cooperative agreements pursuant to 2 CFR part 200 as amended by 2 CFR part 910.

Finding of research misconduct means a determination, based on a preponderance of the evidence, that research misconduct has occurred. Such a finding requires a conclusion that there has been a significant departure from accepted practices of the relevant research community and that it be knowingly, intentionally, or recklessly committed.

Plagiarism means the appropriation of another person's ideas, processes, results, or words without giving appropriate credit.

Research means all basic, applied, and demonstration research in all fields of science, engineering, and mathematics, such as research in economics, education, linguistics, medicine, psychology, social sciences, statistics, and research involving human subjects or animals.

Research misconduct means fabrication, falsification, or plagiarism in proposing, performing, or reviewing research, or in reporting research results, but does not include honest error or differences of opinion.

Research record means the record of all data or results that embody the facts resulting from scientists' inquiries, including, but not limited to, research proposals, laboratory records, both physical and electronic, progress reports, abstracts, theses, oral presentations, internal reports, and journal articles

[70 FR 37014, June 28, 2005, as amended at 79 FR 76047, Dec. 19, 2014]

§ 733.4 Research misconduct requirements.

DOE intends to apply the research misconduct policy set forth in 65 FR 76260-76264 by including appropriate research misconduct requirements in contracts and financial assistance awards that make contractors and financial recipients primarily responsible for implementing the policy in dealing with allegations of research misconduct in connection with the proposal, performance or review of research for DOE .

§ 733.5 Allegations received by DOE.

If DOE receives directly a written allegation of research misconduct with regard to research under a DOE contract or financial assistance agreement, DOE will refer the allegation for processing to the DOE Element responsible for the contract or financial assistance agreement.

§ 733.6 Consultation with the DOE Office of the Inspector General.

Upon receipt of an allegation of research misconduct, the DOE Element shall consult with the DOE Office of the Inspector General which will determine whether that office will elect to investigate the allegation.

§ 733.7 Referral to the contracting officer.

If the DOE Office of the Inspector General declines to investigate an allegation of research misconduct, the DOE Element should forward the allegation to the contracting officer responsible for administration of the contract or financial assistance agreement to which the allegation pertains.

§ 733.8 Contracting officer procedures.

Upon receipt of an allegation of research misconduct by referral under § 733.7, the contracting officer should, by notification of the contractor or financial assistance recipient:

(a) Require the contractor or the financial assistance recipient to act on the allegation consistent with the Research Misconduct requirements in the contract or financial assistance award to which the allegation pertains; or

(b) In the event the contractor or the financial assistance recipient is unable to act:

(1) Designate an appropriate DOE program to conduct an investigation to develop a complete factual record and an examination of such record leading to either a finding of research misconduct and an identification of appropriate remedies or a determination that no further action is warranted; and

(2) Make the appropriate findings consistent with the Research Misconduct requirements contained in the contract or financial assistance award, in order to act in lieu of the contractor or financial assistance recipient.

PART 745 PROTECTION OF HUMAN SUBJECTS

Authority: 5 U.S.C. 301; 42 U.S.C. 7254; 42 U.S.C. 300v-1(b).

Source: 82 FR 7269, Jan. 19, 2017, unless otherwise noted.

§ 745.101 To what does this policy apply?

(a) Except as detailed in § 745.104, this policy applies to all research involving human subjects conducted, supported, or otherwise subject to regulation by any Federal department or agency that takes appropriate administrative action to make the policy applicable to such research. This includes research conducted by Federal civilian employees or military personnel, except that each department or agency head may adopt such procedural modifications as may be appropriate from an administrative standpoint. It also includes research conducted, supported, or otherwise subject to regulation by the Federal Government outside the United States. Institutions that are engaged in research described in this paragraph and institutional review boards (IRBs) reviewing research that is subject to this policy must comply with this policy.

(b) [Reserved]

(c) Department or agency heads retain final judgment as to whether a particular activity is covered by this policy and this judgment shall be exercised consistent with the ethical principles of the Belmont Report. 62

62 The National Commission for the Protection of Human Subjects of Biomedical and Behavioral Research.- Belmont Report. Washington, DC: U.S. Department of Health and Human Services. 1979.

(d) Department or agency heads may require that specific research activities or classes of research activities conducted, supported, or otherwise subject to regulation by the Federal department or agency but not otherwise covered by this policy comply with some or all of the requirements of this policy.

(e) Compliance with this policy requires compliance with pertinent federal laws or regulations that provide additional protections for human subjects.

(f) This policy does not affect any state or local laws or regulations (including tribal law passed by the official governing body of an American Indian or Alaska Native tribe) that may otherwise be applicable and that provide additional protections for human subjects.

(g) This policy does not affect any foreign laws or regulations that may otherwise be applicable and that provide additional protections to human subjects of research.

(h) When research covered by this policy takes place in foreign countries, procedures normally followed in the foreign countries to protect human subjects may differ from those set forth in this policy. In these circumstances, if a department or agency head determines that the procedures prescribed by the institution afford protections that are at least equivalent to those provided in this policy, the department or agency head may approve the substitution of the foreign procedures in lieu of the procedural requirements provided in this policy. Except when otherwise required by statute, Executive Order, or the department or agency head, notices of these actions as they occur will be published in the Federal Register or will be otherwise published as provided in department or agency procedures.

(i) Unless otherwise required by law, department or agency heads may waive the applicability of some or all of the provisions of this policy to specific research activities or classes of research activities otherwise covered by this policy, provided the alternative procedures to be followed are consistent with the principles of the Belmont Report. 63 Except when otherwise required by statute or Executive Order, the department or agency head shall forward advance notices of these actions to the Office for Human Research Protections, Department of Health and Human Services (HHS), or any successor office, or to the equivalent office within the appropriate Federal department or agency, and shall also publish them in the Federal Register or in such other manner as provided in department or agency procedures. The waiver notice must include a statement that identifies the conditions under which the waiver will be applied and a justification as to why the waiver is appropriate for the research, including how the decision is consistent with the principles of the Belmont Report.

63 Id.

(j) Federal guidance on the requirements of this policy shall be issued only after consultation, for the purpose of harmonization (to the extent appropriate), with other Federal departments and agencies that have adopted this policy, unless such consultation is not feasible.

(k) [Reserved]

(l) Compliance dates and transition provisions:

(1) Pre-2018 Requirements. For purposes of this section, the pre-2018 Requirements means this subpart as published in the 2016 edition of the Code of Federal Regulations.

(2) 2018 Requirements. For purposes of this section, the 2018 Requirements means the Federal Policy for the Protection of Human Subjects requirements contained in this part. The general compliance date for the 2018 Requirements is January 21, 2019. The compliance date for § 745.114(b) (cooperative research) of the 2018 Requirements is January 20, 2020.

(3) Research subject to pre-2018 requirements. The pre-2018 Requirements shall apply to the following research, unless the research is transitioning to comply with the 2018 Requirements in accordance with paragraph (l)(4) of this section:

(i) Research initially approved by an IRB under the pre-2018 Requirements before January 21, 2019;

(ii) Research for which IRB review was waived pursuant to § 745.101(i) of the pre-2018 Requirements before January 21, 2019; and

(iii) Research for which a determination was made that the research was exempt under § 745.101(b) of the pre-2018 Requirements before January 21, 2019.

(4) Transitioning research. If, on or after July 19, 2018, an institution planning or engaged in research otherwise covered by paragraph (l)(3) of this section determines that such research instead will transition to comply with the 2018 Requirements, the institution or an IRB must document and date such determination.

(i) If the determination to transition is documented between July 19, 2018, and January 20, 2019, the research shall:

(A) Beginning on the date of such documentation through January 20, 2019, comply with the pre-2018 Requirements, except that the research shall comply with the following:

(1) Section 745.102(l) of the 2018 Requirements (definition of research) (instead of § 745.102(d) of the pre-2018 Requirements);

(2) Section 745.103(d) of the 2018 Requirements (revised certification requirement that eliminates IRB review of application or proposal) (instead of § 745.103(f) of the pre-2018 Requirements); and

(3) Section 745.109(f)(1)(i) and (iii) of the 2018 Requirements (exceptions to mandated continuing review) (instead of § 745.103(b), as related to the requirement for continuing review, and in addition to § 745.109, of the pre-2018 Requirements); and

(B) Beginning on January 21, 2019, comply with the 2018 Requirements.

(ii) If the determination to transition is documented on or after January 21, 2019, the research shall, beginning on the date of such documentation, comply with the 2018 Requirements.

(5) Research subject to 2018 Requirements. The 2018 Requirements shall apply to the following research:

(i) Research initially approved by an IRB on or after January 21, 2019;

(ii) Research for which IRB review is waived pursuant to paragraph (i) of this section on or after January 21, 2019; and

(iii) Research for which a determination is made that the research is exempt on or after January 21, 2019.

(m) Severability: Any provision of this part held to be invalid or unenforceable by its terms, or as applied to any person or circumstance, shall be construed so as to continue to give maximum effect to the provision permitted by law, unless such holding shall be one of utter invalidity or unenforceability, in which event the provision shall be severable from this part and shall not affect the remainder thereof or the application of the provision to other persons not similarly situated or to other dissimilar circumstances.

[82 FR 7269, Jan. 19, 2017, as amended at 83 FR 28511, June 19, 2018]

§ 745.102 Definitions for purposes of this policy.

(a) Certification means the official notification by the institution to the supporting Federal department or agency component, in accordance with the requirements of this policy, that a research project or activity involving human subjects has been reviewed and approved by an IRB in accordance with an approved assurance.

(b) Clinical trial means a research study in which one or more human subjects are prospectively assigned to one or more interventions (which may include placebo or other control) to evaluate the effects of the interventions on biomedical or behavioral health-related outcomes.

(c) Department or agency head means the head of any Federal department or agency, for example, the Secretary of HHS, and any other officer or employee of any Federal department or agency to whom the authority provided by these regulations to the department or agency head has been delegated.

(d) Federal department or agency refers to a federal department or agency (the department or agency itself rather than its bureaus, offices or divisions) that takes appropriate administrative action to make this policy applicable to the research involving human subjects it conducts, supports, or otherwise regulates (e.g., the U.S. Department of Health and Human Services, the U.S. Department of Defense, or the Central Intelligence Agency).

(e)(1) Human subject means a living individual about whom an investigator (whether professional or student) conducting research:

(i) Obtains information or biospecimens through intervention or interaction with the individual, and uses, studies, or analyzes the information or biospecimens; or (ii) Obtains, uses, studies, analyzes, or generates identifiable private information or identifiable biospecimens.

(2) Intervention includes both physical procedures by which information or biospecimens are gathered (e.g., venipuncture) and manipulations of the subject or the subject's environment that are performed for research purposes.

(3) Interaction includes communication or interpersonal contact between investigator and subject.

(4) Private information includes information about behavior that occurs in a context in which an individual can reasonably expect that no observation or recording is taking place, and information that has been provided for specific purposes by an individual and that the individual can reasonably expect will not be made public (e.g., a medical record).

(5) Identifiable private information is private information for which the identity of the subject is or may readily be ascertained by the investigator or associated with the information.

(6) An identifiable biospecimen is a biospecimen for which the identity of the subject is or may readily be ascertained by the investigator or associated with the biospecimen.

(7) Federal departments or agencies implementing this policy shall:

(i) Upon consultation with appropriate experts (including experts in data matching and re-identification), reexamine the meaning of “identifiable private information,” as defined in paragraph (e)(5) of this section, and “identifiable biospecimen,” as defined in paragraph (e)(6) of this section. This reexamination shall take place within 1 year and regularly thereafter (at least every 4 years). This process will be conducted by collaboration among the Federal departments and agencies implementing this policy. If appropriate and permitted by law, such Federal departments and agencies may alter the interpretation of these terms, including through the use of guidance.

(ii) Upon consultation with appropriate experts, assess whether there are analytic technologies or techniques that should be considered by investigators to generate “identifiable private information,” as defined in paragraph (e)(5) of this section, or an “identifiable biospecimen,” as defined in paragraph (e)(6) of this section. This assessment shall take place within 1 year and regularly thereafter (at least every 4 years). This process will be conducted by collaboration among the Federal departments and agencies implementing this policy. Any such technologies or techniques will be included on a list of technologies or techniques that produce identifiable private information or identifiable biospecimens. This list will be published in the Federal Register after notice and an opportunity for public comment. The Secretary, HHS, shall maintain the list on a publicly accessible Web site.

(f) Institution means any public or private entity, or department or agency (including federal, state, and other agencies).

(g) IRB means an institutional review board established in accord with and for the purposes expressed in this policy.

(h) IRB approval means the determination of the IRB that the research has been reviewed and may be conducted at an institution within the constraints set forth by the IRB and by other institutional and federal requirements.

(i) Legally authorized representative means an individual or judicial or other body authorized under applicable law to consent on behalf of a prospective subject to the subject's participation in the procedure(s) involved in the research. If there is no applicable law addressing this issue, legally authorized representative means an individual recognized by institutional policy as acceptable for providing consent in the nonresearch context on behalf of the prospective subject to the subject's participation in the procedure(s) involved in the research.

(j) Minimal risk means that the probability and magnitude of harm or discomfort anticipated in the research are not greater in and of themselves than those ordinarily encountered in daily life or during the performance of routine physical or psychological examinations or tests.

(k) Public health authority means an agency or authority of the United States, a state, a territory, a political subdivision of a state or territory, an Indian tribe, or a foreign government, or a person or entity acting under a grant of authority from or contract with such public agency, including the employees or agents of such public agency or its contractors or persons or entities to whom it has granted authority, that is responsible for public health matters as part of its official mandate.

(l) Research means a systematic investigation, including research development, testing, and evaluation, designed to develop or contribute to generalizable knowledge. Activities that meet this definition constitute research for purposes of this policy, whether or not they are conducted or supported under a program that is considered research for other purposes. For example, some demonstration and service programs may include research activities. For purposes of this part, the following activities are deemed not to be research:

(1) Scholarly and journalistic activities (e.g., oral history, journalism, biography, literary criticism, legal research, and historical scholarship), including the collection and use of information, that focus directly on the specific individuals about whom the information is collected.

(2) Public health surveillance activities, including the collection and testing of information or biospecimens, conducted, supported, requested, ordered, required, or authorized by a public health authority. Such activities are limited to those necessary to allow a public health authority to identify, monitor, assess, or investigate potential public health signals, onsets of disease outbreaks, or conditions of public health importance (including trends, signals, risk factors, patterns in diseases, or increases in injuries from using consumer products). Such activities include those associated with providing timely situational awareness and priority setting during the course of an event or crisis that threatens public health (including natural or man-made disasters).

(3) Collection and analysis of information, biospecimens, or records by or for a criminal justice agency for activities authorized by law or court order solely for criminal justice or criminal investigative purposes.

(4) Authorized operational activities (as determined by each agency) in support of intelligence, homeland security, defense, or other national security missions.

(m) Written, or in writing, for purposes of this part, refers to writing on a tangible medium (e.g., paper) or in an electronic format.

§ 745.103 Assuring compliance with this policy—research conducted or supported by any Federal department or agency.

(a) Each institution engaged in research that is covered by this policy, with the exception of research eligible for exemption under § 745.104, and that is conducted or supported by a Federal department or agency, shall provide written assurance satisfactory to the department or agency head that it will comply with the requirements of this policy. In lieu of requiring submission of an assurance, individual department or agency heads shall accept the existence of a current assurance, appropriate for the research in question, on file with the Office for Human Research Protections, HHS, or any successor office, and approved for Federal-wide use by that office. When the existence of an HHS-approved assurance is accepted in lieu of requiring submission of an assurance, reports (except certification) required by this policy to be made to department and agency heads shall also be made to the Office for Human Research Protections, HHS, or any successor office. Federal departments and agencies will conduct or support research covered by this policy only if the institution has provided an assurance that it will comply with the requirements of this policy, as provided in this section, and only if the institution has certified to the department or agency head that the research has been reviewed and approved by an IRB (if such certification is required by § 745.103(d)).

(b) The assurance shall be executed by an individual authorized to act for the institution and to assume on behalf of the institution the obligations imposed by this policy and shall be filed in such form and manner as the department or agency head prescribes.

(c) The department or agency head may limit the period during which any assurance shall remain effective or otherwise condition or restrict the assurance.

(d) Certification is required when the research is supported by a Federal department or agency and not otherwise waived under § 745.101(i) or exempted under § 745.104. For such research, institutions shall certify that each proposed research study covered by the assurance and this section has been reviewed and approved by the IRB. Such certification must be submitted as prescribed by the Federal department or agency component supporting the research. Under no condition shall research covered by this section be initiated prior to receipt of the certification that the research has been reviewed and approved by the IRB.

(e) For nonexempt research involving human subjects covered by this policy (or exempt research for which limited IRB review takes place pursuant to § 745.104(d)(2)(iii), (d)(3)(i)(C), or (d)(7) or (8)) that takes place at an institution in which IRB oversight is conducted by an IRB that is not operated by the institution, the institution and the organization operating the IRB shall document the institution's reliance on the IRB for oversight of the research and the responsibilities that each entity will undertake to ensure compliance with the requirements of this policy (e.g., in a written agreement between the institution and the IRB, by implementation of an institution-wide policy directive providing the allocation of responsibilities between the institution and an IRB that is not affiliated with the institution, or as set forth in a research protocol).

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.104 Exempt research.

(a) Unless otherwise required by law or by department or agency heads, research activities in which the only involvement of human subjects will be in one or more of the categories in paragraph (d) of this section are exempt from the requirements of this policy, except that such activities must comply with the requirements of this section and as specified in each category.

(b) Use of the exemption categories for research subject to the requirements of subparts B, C, and D: Application of the exemption categories to research subject to the requirements of 45 CFR part 46, subparts B, C, and D, is as follows:

(1) Subpart B. Each of the exemptions at this section may be applied to research subject to subpart B if the conditions of the exemption are met.

(2) Subpart C. The exemptions at this section do not apply to research subject to subpart C, except for research aimed at involving a broader subject population that only incidentally includes prisoners.

(3) Subpart D. The exemptions at paragraphs (d)(1), (4), (5), (6), (7), and (8) of this section may be applied to research subject to subpart D if the conditions of the exemption are met. Paragraphs (d)(2)(i) and (ii) of this section only may apply to research subject to subpart D involving educational tests or the observation of public behavior when the investigator(s) do not participate in the activities being observed. Paragraph (d)(2)(iii) of this section may not be applied to research subject to subpart D.

(c) [Reserved]

(d) Except as described in paragraph (a) of this section, the following categories of human subjects research are exempt from this policy:

(1) Research, conducted in established or commonly accepted educational settings, that specifically involves normal educational practices that are not likely to adversely impact students' opportunity to learn required educational content or the assessment of educators who provide instruction. This includes most research on regular and special education instructional strategies, and research on the effectiveness of or the comparison among instructional techniques, curricula, or classroom management methods.

(2) Research that only includes interactions involving educational tests (cognitive, diagnostic, aptitude, achievement), survey procedures, interview procedures, or observation of public behavior (including visual or auditory recording) if at least one of the following criteria is met:

(i) The information obtained is recorded by the investigator in such a manner that the identity of the human subjects cannot readily be ascertained, directly or through identifiers linked to the subjects;

(ii) Any disclosure of the human subjects' responses outside the research would not reasonably place the subjects at risk of criminal or civil liability or be damaging to the subjects' financial standing, employability, educational advancement, or reputation; or

(iii) The information obtained is recorded by the investigator in such a manner that the identity of the human subjects can readily be ascertained, directly or through identifiers linked to the subjects, and an IRB conducts a limited IRB review to make the determination required by § 745.111(a)(7).

(3)(i) Research involving benign behavioral interventions in conjunction with the collection of information from an adult subject through verbal or written responses (including data entry) or audiovisual recording if the subject prospectively agrees to the intervention and information collection and at least one of the following criteria is met:

(A) The information obtained is recorded by the investigator in such a manner that the identity of the human subjects cannot readily be ascertained, directly or through identifiers linked to the subjects;

(B) Any disclosure of the human subjects' responses outside the research would not reasonably place the subjects at risk of criminal or civil liability or be damaging to the subjects' financial standing, employability, educational advancement, or reputation; or

(C) The information obtained is recorded by the investigator in such a manner that the identity of the human subjects can readily be ascertained, directly or through identifiers linked to the subjects, and an IRB conducts a limited IRB review to make the determination required by § 745.111(a)(7).

(ii) For the purpose of this provision, benign behavioral interventions are brief in duration, harmless, painless, not physically invasive, not likely to have a significant adverse lasting impact on the subjects, and the investigator has no reason to think the subjects will find the interventions offensive or embarrassing. Provided all such criteria are met, examples of such benign behavioral interventions would include having the subjects play an online game, having them solve puzzles under various noise conditions, or having them decide how to allocate a nominal amount of received cash between themselves and someone else.

(iii) If the research involves deceiving the subjects regarding the nature or purposes of the research, this exemption is not applicable unless the subject authorizes the deception through a prospective agreement to participate in research in circumstances in which the subject is informed that he or she will be unaware of or misled regarding the nature or purposes of the research.

(4) Secondary research for which consent is not required: Secondary research uses of identifiable private information or identifiable biospecimens, if at least one of the following criteria is met:

(i) The identifiable private information or identifiable biospecimens are publicly available;

(ii) Information, which may include information about biospecimens, is recorded by the investigator in such a manner that the identity of the human subjects cannot readily be ascertained directly or through identifiers linked to the subjects, the investigator does not contact the subjects, and the investigator will not re-identify subjects;

(iii) The research involves only information collection and analysis involving the investigator's use of identifiable health information when that use is regulated under 45 CFR parts 160 and 164, subparts A and E, for the purposes of “health care operations” or “research” as those terms are defined at 45 CFR 164.501 or for “public health activities and purposes” as described under 45 CFR 164.512(b); or

(iv) The research is conducted by, or on behalf of, a Federal department or agency using government-generated or government-collected information obtained for nonresearch activities, if the research generates identifiable private information that is or will be maintained on information technology that is subject to and in compliance with section 208(b) of the E-Government Act of 2002, 44 U.S.C. 3501 note, if all of the identifiable private information collected, used, or generated as part of the activity will be maintained in systems of records subject to the Privacy Act of 1974, 5 U.S.C. 552a, and, if applicable, the information used in the research was collected subject to the Paperwork Reduction Act of 1995, 44 U.S.C. 3501 et seq.

(5) Research and demonstration projects that are conducted or supported by a Federal department or agency, or otherwise subject to the approval of department or agency heads (or the approval of the heads of bureaus or other subordinate agencies that have been delegated authority to conduct the research and demonstration projects), and that are designed to study, evaluate, improve, or otherwise examine public benefit or service programs, including procedures for obtaining benefits or services under those programs, possible changes in or alternatives to those programs or procedures, or possible changes in methods or levels of payment for benefits or services under those programs. Such projects include, but are not limited to, internal studies by Federal employees, and studies under contracts or consulting arrangements, cooperative agreements, or grants. Exempt projects also include waivers of otherwise mandatory requirements using authorities such as sections 1115 and 1115A of the Social Security Act, as amended.

(i) Each Federal department or agency conducting or supporting the research and demonstration projects must establish, on a publicly accessible Federal Web site or in such other manner as the department or agency head may determine, a list of the research and demonstration projects that the Federal department or agency conducts or supports under this provision. The research or demonstration project must be published on this list prior to commencing the research involving human subjects.

(ii) [Reserved]

(6) Taste and food quality evaluation and consumer acceptance studies:

(i) If wholesome foods without additives are consumed, or

(ii) If a food is consumed that contains a food ingredient at or below the level and for a use found to be safe, or agricultural chemical or environmental contaminant at or below the level found to be safe, by the Food and Drug Administration or approved by the Environmental Protection Agency or the Food Safety and Inspection Service of the U.S. Department of Agriculture.

(7) Storage or maintenance for secondary research for which broad consent is required: Storage or maintenance of identifiable private information or identifiable biospecimens for potential secondary research use if an IRB conducts a limited IRB review and makes the determinations required by § 745.111(a)(8).

(8) Secondary research for which broad consent is required: Research involving the use of identifiable private information or identifiable biospecimens for secondary research use, if the following criteria are met:

(i) Broad consent for the storage, maintenance, and secondary research use of the identifiable private information or identifiable biospecimens was obtained in accordance with § 745.116(a)(1) through (4), (a)(6), and (d);

(ii) Documentation of informed consent or waiver of documentation of consent was obtained in accordance with § 745.117;

(iii) An IRB conducts a limited IRB review and makes the determination required by § 745.111(a)(7) and makes the determination that the research to be conducted is within the scope of the broad consent referenced in paragraph (d)(8)(i) of this section; and (iv) The investigator does not include returning individual research results to subjects as part of the study plan. This provision does not prevent an investigator from abiding by any legal requirements to return individual research results.

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§§ 745.105-745.106 [Reserved]

§ 745.107 IRB membership.

(a) Each IRB shall have at least five members, with varying backgrounds to promote complete and adequate review of research activities commonly conducted by the institution. The IRB shall be sufficiently qualified through the experience and expertise of its members (professional competence), and the diversity of its members, including race, gender, and cultural backgrounds and sensitivity to such issues as community attitudes, to promote respect for its advice and counsel in safeguarding the rights and welfare of human subjects. The IRB shall be able to ascertain the acceptability of proposed research in terms of institutional commitments (including policies and resources) and regulations, applicable law, and standards of professional conduct and practice. The IRB shall therefore include persons knowledgeable in these areas. If an IRB regularly reviews research that involves a category of subjects that is vulnerable to coercion or undue influence, such as children, prisoners, individuals with impaired decision-making capacity, or economically or educationally disadvantaged persons, consideration shall be given to the inclusion of one or more individuals who are knowledgeable about and experienced in working with these categories of subjects.

(b) Each IRB shall include at least one member whose primary concerns are in scientific areas and at least one member whose primary concerns are in nonscientific areas.

(c) Each IRB shall include at least one member who is not otherwise affiliated with the institution and who is not part of the immediate family of a person who is affiliated with the institution.

(d) No IRB may have a member participate in the IRB's initial or continuing review of any project in which the member has a conflicting interest, except to provide information requested by the IRB.

(e) An IRB may, in its discretion, invite individuals with competence in special areas to assist in the review of issues that require expertise beyond or in addition to that available on the IRB. These individuals may not vote with the IRB.

§ 745.108 IRB functions and operations.

(a) In order to fulfill the requirements of this policy each IRB shall:

(1) Have access to meeting space and sufficient staff to support the IRB's review and recordkeeping duties;

(2) Prepare and maintain a current list of the IRB members identified by name; earned degrees; representative capacity; indications of experience such as board certifications or licenses sufficient to describe each member's chief anticipated contributions to IRB deliberations; and any employment or other relationship between each member and the institution, for example, full-time employee, part-time employee, member of governing panel or board, stockholder, paid or unpaid consultant;

(3) Establish and follow written procedures for:

(i) Conducting its initial and continuing review of research and for reporting its findings and actions to the investigator and the institution;

(ii) Determining which projects require review more often than annually and which projects need verification from sources other than the investigators that no material changes have occurred since previous IRB review; and

(iii) Ensuring prompt reporting to the IRB of proposed changes in a research activity, and for ensuring that investigators will conduct the research activity in accordance with the terms of the IRB approval until any proposed changes have been reviewed and approved by the IRB, except when necessary to eliminate apparent immediate hazards to the subject.

(4) Establish and follow written procedures for ensuring prompt reporting to the IRB; appropriate institutional officials; the department or agency head; and the Office for Human Research Protections, HHS, or any successor office, or the equivalent office within the appropriate Federal department or agency of

(i) Any unanticipated problems involving risks to subjects or others or any serious or continuing noncompliance with this policy or the requirements or determinations of the IRB; and

(ii) Any suspension or termination of IRB approval.

(b) Except when an expedited review procedure is used (as described in § 745.110), an IRB must review proposed research at convened meetings at which a majority of the members of the IRB are present, including at least one member whose primary concerns are in nonscientific areas. In order for the research to be approved, it shall receive the approval of a majority of those members present at the meeting.

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.109 IRB review of research.

(a) An IRB shall review and have authority to approve, require modifications in (to secure approval), or disapprove all research activities covered by this policy, including exempt research activities under § 745.104 for which limited IRB review is a condition of exemption (under § 745.104(d)(2)(iii), (d)(3)(i)(C), and (d)(7), and (8)).

(b) An IRB shall require that information given to subjects (or legally authorized representatives, when appropriate) as part of informed consent is in accordance with § 745.116. The IRB may require that information, in addition to that specifically mentioned in § 745.116, be given to the subjects when in the IRB's judgment the information would meaningfully add to the protection of the rights and welfare of subjects.

(c) An IRB shall require documentation of informed consent or may waive documentation in accordance with § 745.117.

(d) An IRB shall notify investigators and the institution in writing of its decision to approve or disapprove the proposed research activity, or of modifications required to secure IRB approval of the research activity. If the IRB decides to disapprove a research activity, it shall include in its written notification a statement of the reasons for its decision and give the investigator an opportunity to respond in person or in writing.

(e) An IRB shall conduct continuing review of research requiring review by the convened IRB at intervals appropriate to the degree of risk, not less than once per year, except as described in § 745.109(f).

(f)(1) Unless an IRB determines otherwise, continuing review of research is not required in the following circumstances:

(i) Research eligible for expedited review in accordance with § 745.110;

(ii) Research reviewed by the IRB in accordance with the limited IRB review described in § 745.104(d)(2)(iii), (d)(3)(i)(C), or (d)(7) or (8);

(iii) Research that has progressed to the point that it involves only one or both of the following, which are part of the IRB-approved study:

(A) Data analysis, including analysis of identifiable private information or identifiable biospecimens, or

(B) Accessing follow-up clinical data from procedures that subjects would undergo as part of clinical care.

(2) [Reserved]

(g) An IRB shall have authority to observe or have a third party observe the consent process and the research.

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.110 Expedited review procedures for certain kinds of research involving no more than minimal risk, and for minor changes in approved research.

(a) The Secretary of HHS has established, and published as a Notice in the Federal Register, a list of categories of research that may be reviewed by the IRB through an expedited review procedure. The Secretary will evaluate the list at least every 8 years and amend it, as appropriate, after consultation with other federal departments and agencies and after publication in the Federal Register for public comment. A copy of the list is available from the Office for Human Research Protections, HHS, or any successor office.

(b)(1) An IRB may use the expedited review procedure to review the following:

(i) Some or all of the research appearing on the list described in paragraph (a) of this section, unless the reviewer determines that the study involves more than minimal risk;

(ii) Minor changes in previously approved research during the period for which approval is authorized; or

(iii) Research for which limited IRB review is a condition of exemption under § 745.104(d)(2)(iii), (d)(3)(i)(C), and (d)(7) and (8).

(2) Under an expedited review procedure, the review may be carried out by the IRB chairperson or by one or more experienced reviewers designated by the chairperson from among members of the IRB. In reviewing the research, the reviewers may exercise all of the authorities of the IRB except that the reviewers may not disapprove the research. A research activity may be disapproved only after review in accordance with the nonexpedited procedure set forth in § 745.108(b).

(c) Each IRB that uses an expedited review procedure shall adopt a method for keeping all members advised of research proposals that have been approved under the procedure.

(d) The department or agency head may restrict, suspend, terminate, or choose not to authorize an institution's or IRB's use of the expedited review procedure.

§ 745.111 Criteria for IRB approval of research.

(a) In order to approve research covered by this policy the IRB shall determine that all of the following requirements are satisfied:

(1) Risks to subjects are minimized:

(i) By using procedures that are consistent with sound research design and that do not unnecessarily expose subjects to risk, and

(ii) Whenever appropriate, by using procedures already being performed on the subjects for diagnostic or treatment purposes.

(2) Risks to subjects are reasonable in relation to anticipated benefits, if any, to subjects, and the importance of the knowledge that may reasonably be expected to result. In evaluating risks and benefits, the IRB should consider only those risks and benefits that may result from the research (as distinguished from risks and benefits of therapies subjects would receive even if not participating in the research). The IRB should not consider possible long-range effects of applying knowledge gained in the research (e.g., the possible effects of the research on public policy) as among those research risks that fall within the purview of its responsibility.

(3) Selection of subjects is equitable. In making this assessment the IRB should take into account the purposes of the research and the setting in which the research will be conducted. The IRB should be particularly cognizant of the special problems of research that involves a category of subjects who are vulnerable to coercion or undue influence, such as children, prisoners, individuals with impaired decision-making capacity, or economically or educationally disadvantaged persons.

(4) Informed consent will be sought from each prospective subject or the subject's legally authorized representative, in accordance with, and to the extent required by, § 745.116.

(5) Informed consent will be appropriately documented or appropriately waived in accordance with § 745.117.

(6) When appropriate, the research plan makes adequate provision for monitoring the data collected to ensure the safety of subjects.

(7) When appropriate, there are adequate provisions to protect the privacy of subjects and to maintain the confidentiality of data.

(i) The Secretary of HHS will, after consultation with the Office of Management and Budget's privacy office and other Federal departments and agencies that have adopted this policy, issue guidance to assist IRBs in assessing what provisions are adequate to protect the privacy of subjects and to maintain the confidentiality of data.

(ii) [Reserved]

(8) For purposes of conducting the limited IRB review required by § 745.104(d)(7)), the IRB need not make the determinations at paragraphs (a)(1) through (7) of this section, and shall make the following determinations:

(i) Broad consent for storage, maintenance, and secondary research use of identifiable private information or identifiable biospecimens is obtained in accordance with the requirements of § 745.116(a)(1)-(4), (a)(6), and (d);

(ii) Broad consent is appropriately documented or waiver of documentation is appropriate, in accordance with § 745.117; and

(iii) If there is a change made for research purposes in the way the identifiable private information or identifiable biospecimens are stored or maintained, there are adequate provisions to protect the privacy of subjects and to maintain the confidentiality of data.

(b) When some or all of the subjects are likely to be vulnerable to coercion or undue influence, such as children, prisoners, individuals with impaired decision-making capacity, or economically or educationally disadvantaged persons, additional safeguards have been included in the study to protect the rights and welfare of these subjects.

§ 745.112 Review by Institution.

Research covered by this policy that has been approved by an IRB may be subject to further appropriate review and approval or disapproval by officials of the institution. However, those officials may not approve the research if it has not been approved by an IRB.

§ 745.113 Suspension or Termination of IRB Approval of Research.

An IRB shall have authority to suspend or terminate approval of research that is not being conducted in accordance with the IRB's requirements or that has been associated with unexpected serious harm to subjects. Any suspension or termination of approval shall include a statement of the reasons for the IRB's action and shall be reported promptly to the investigator, appropriate institutional officials, and the department or agency head.

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.114 Cooperative Research.

(a) Cooperative research projects are those projects covered by this policy that involve more than one institution. In the conduct of cooperative research projects, each institution is responsible for safeguarding the rights and welfare of human subjects and for complying with this policy.

(b)(1) Any institution located in the United States that is engaged in cooperative research must rely upon approval by a single IRB for that portion of the research that is conducted in the United States. The reviewing IRB will be identified by the Federal department or agency supporting or conducting the research or proposed by the lead institution subject to the acceptance of the Federal department or agency supporting the research.

(2) The following research is not subject to this provision:

(i) Cooperative research for which more than single IRB review is required by law (including tribal law passed by the official governing body of an American Indian or Alaska Native tribe); or

(ii) Research for which any Federal department or agency supporting or conducting the research determines and documents that the use of a single IRB is not appropriate for the particular context.

(c) For research not subject to paragraph (b) of this section, an institution participating in a cooperative project may enter into a joint review arrangement, rely on the review of another IRB, or make similar arrangements for avoiding duplication of effort.

§ 745.115 IRB Records.

(a) An institution, or when appropriate an IRB, shall prepare and maintain adequate documentation of IRB activities, including the following:

(1) Copies of all research proposals reviewed, scientific evaluations, if any, that accompany the proposals, approved sample consent forms, progress reports submitted by investigators, and reports of injuries to subjects.

(2) Minutes of IRB meetings, which shall be in sufficient detail to show attendance at the meetings; actions taken by the IRB; the vote on these actions including the number of members voting for, against, and abstaining; the basis for requiring changes in or disapproving research; and a written summary of the discussion of controverted issues and their resolution.

(3) Records of continuing review activities, including the rationale for conducting continuing review of research that otherwise would not require continuing review as described in § 745.109(f)(1).

(4) Copies of all correspondence between the IRB and the investigators.

(5) A list of IRB members in the same detail as described in § 745.108(a)(2).

(6) Written procedures for the IRB in the same detail as described in § 745.108(a)(3) and (4).

(7) Statements of significant new findings provided to subjects, as required by § 745.116(c)(5).

(8) The rationale for an expedited reviewer's determination under § 745.110(b)(1)(i) that research appearing on the expedited review list described in § 745.110(a) is more than minimal risk.

(9) Documentation specifying the responsibilities that an institution and an organization operating an IRB each will undertake to ensure compliance with the requirements of this policy, as described in § 745.103(e).

(b) The records required by this policy shall be retained for at least 3 years, and records relating to research that is conducted shall be retained for at least 3 years after completion of the research. The institution or IRB may maintain the records in printed form, or electronically. All records shall be accessible for inspection and copying by authorized representatives of the Federal department or agency at reasonable times and in a reasonable manner.

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.116 General Requirements for Informed Consent.

(a) General. General requirements for informed consent, whether written or oral, are set forth in this paragraph and apply to consent obtained in accordance with the requirements set forth in paragraphs (b) through (d) of this section. Broad consent may be obtained in lieu of informed consent obtained in accordance with paragraphs (b) and (c) of this section only with respect to the storage, maintenance, and secondary research uses of identifiable private information and identifiable biospecimens. Waiver or alteration of consent in research involving public benefit and service programs conducted by or subject to the approval of state or local officials is described in paragraph (e) of this section. General waiver or alteration of informed consent is described in paragraph (f) of this section. Except as provided elsewhere in this policy:

(1) Before involving a human subject in research covered by this policy, an investigator shall obtain the legally effective informed consent of the subject or the subject's legally authorized representative.

(2) An investigator shall seek informed consent only under circumstances that provide the prospective subject or the legally authorized representative sufficient opportunity to discuss and consider whether or not to participate and that minimize the possibility of coercion or undue influence.

(3) The information that is given to the subject or the legally authorized representative shall be in language understandable to the subject or the legally authorized representative.

(4) The prospective subject or the legally authorized representative must be provided with the information that a reasonable person would want to have in order to make an informed decision about whether to participate, and an opportunity to discuss that information.

(5) Except for broad consent obtained in accordance with paragraph (d) of this section:

(i) Informed consent must begin with a concise and focused presentation of the key information that is most likely to assist a prospective subject or legally authorized representative in understanding the reasons why one might or might not want to participate in the research. This part of the informed consent must be organized and presented in a way that facilitates comprehension.

(ii) Informed consent as a whole must present information in sufficient detail relating to the research, and must be organized and presented in a way that does not merely provide lists of isolated facts, but rather facilitates the prospective subject's or legally authorized representative's understanding of the reasons why one might or might not want to participate.

(6) No informed consent may include any exculpatory language through which the subject or the legally authorized representative is made to waive or appear to waive any of the subject's legal rights, or releases or appears to release the investigator, the sponsor, the institution, or its agents from liability for negligence.

(b) Basic elements of informed consent. Except as provided in paragraph (d), (e), or (f) of this section, in seeking informed consent the following information shall be provided to each subject or the legally authorized representative:

(1) A statement that the study involves research, an explanation of the purposes of the research and the expected duration of the subject's participation, a description of the procedures to be followed, and identification of any procedures that are experimental;

(2) A description of any reasonably foreseeable risks or discomforts to the subject;

(3) A description of any benefits to the subject or to others that may reasonably be expected from the research;

(4) A disclosure of appropriate alternative procedures or courses of treatment, if any, that might be advantageous to the subject;

(5) A statement describing the extent, if any, to which confidentiality of records identifying the subject will be maintained;

(6) For research involving more than minimal risk, an explanation as to whether any compensation and an explanation as to whether any medical treatments are available if injury occurs and, if so, what they consist of, or where further information may be obtained;

(7) An explanation of whom to contact for answers to pertinent questions about the research and research subjects' rights, and whom to contact in the event of a research-related injury to the subject;

(8) A statement that participation is voluntary, refusal to participate will involve no penalty or loss of benefits to which the subject is otherwise entitled, and the subject may discontinue participation at any time without penalty or loss of benefits to which the subject is otherwise entitled; and

(9) One of the following statements about any research that involves the collection of identifiable private information or identifiable biospecimens:

(i) A statement that identifiers might be removed from the identifiable private information or identifiable biospecimens and that, after such removal, the information or biospecimens could be used for future research studies or distributed to another investigator for future research studies without additional informed consent from the subject or the legally authorized representative, if this might be a possibility; or

(ii) A statement that the subject's information or biospecimens collected as part of the research, even if identifiers are removed, will not be used or distributed for future research studies.

(c) Additional elements of informed consent. Except as provided in paragraph (d), (e), or (f) of this section, one or more of the following elements of information, when appropriate, shall also be provided to each subject or the legally authorized representative:

(1) A statement that the particular treatment or procedure may involve risks to the subject (or to the embryo or fetus, if the subject is or may become pregnant) that are currently unforeseeable;

(2) Anticipated circumstances under which the subject's participation may be terminated by the investigator without regard to the subject's or the legally authorized representative's consent;

(3) Any additional costs to the subject that may result from participation in the research;

(4) The consequences of a subject's decision to withdraw from the research and procedures for orderly termination of participation by the subject;

(5) A statement that significant new findings developed during the course of the research that may relate to the subject's willingness to continue participation will be provided to the subject;

(6) The approximate number of subjects involved in the study;

(7) A statement that the subject's biospecimens (even if identifiers are removed) may be used for commercial profit and whether the subject will or will not share in this commercial profit;

(8) A statement regarding whether clinically relevant research results, including individual research results, will be disclosed to subjects, and if so, under what conditions; and

(9) For research involving biospecimens, whether the research will (if known) or might include whole genome sequencing (i.e., sequencing of a human germline or somatic specimen with the intent to generate the genome or exome sequence of that specimen).

(d) Elements of broad consent for the storage, maintenance, and secondary research use of identifiable private information or identifiable biospecimens. Broad consent for the storage, maintenance, and secondary research use of identifiable private information or identifiable biospecimens (collected for either research studies other than the proposed research or nonresearch purposes) is permitted as an alternative to the informed consent requirements in paragraphs (b) and (c) of this section. If the subject or the legally authorized representative is asked to provide broad consent, the following shall be provided to each subject or the subject's legally authorized representative:

(1) The information required in paragraphs (b)(2), (b)(3), (b)(5), and (b)(8) and, when appropriate, (c)(7) and (9) of this section;

(2) A general description of the types of research that may be conducted with the identifiable private information or identifiable biospecimens. This description must include sufficient information such that a reasonable person would expect that the broad consent would permit the types of research conducted;

(3) A description of the identifiable private information or identifiable biospecimens that might be used in research, whether sharing of identifiable private information or identifiable biospecimens might occur, and the types of institutions or researchers that might conduct research with the identifiable private information or identifiable biospecimens;

(4) A description of the period of time that the identifiable private information or identifiable biospecimens may be stored and maintained (which period of time could be indefinite), and a description of the period of time that the identifiable private information or identifiable biospecimens may be used for research purposes (which period of time could be indefinite);

(5) Unless the subject or legally authorized representative will be provided details about specific research studies, a statement that they will not be informed of the details of any specific research studies that might be conducted using the subject's identifiable private information or identifiable biospecimens, including the purposes of the research, and that they might have chosen not to consent to some of those specific research studies;

(6) Unless it is known that clinically relevant research results, including individual research results, will be disclosed to the subject in all circumstances, a statement that such results may not be disclosed to the subject; and

(7) An explanation of whom to contact for answers to questions about the subject's rights and about storage and use of the subject's identifiable private information or identifiable biospecimens, and whom to contact in the event of a research-related harm.

(e) Waiver or alteration of consent in research involving public benefit and service programs conducted by or subject to the approval of state or local officials—(1) Waiver. An IRB may waive the requirement to obtain informed consent for research under paragraphs (a) through (c) of this section, provided the IRB satisfies the requirements of paragraph (e)(3) of this section. If an individual was asked to provide broad consent for the storage, maintenance, and secondary research use of identifiable private information or identifiable biospecimens in accordance with the requirements at paragraph (d) of this section, and refused to consent, an IRB cannot waive consent for the storage, maintenance, or secondary research use of the identifiable private information or identifiable biospecimens.

(2) Alteration. An IRB may approve a consent procedure that omits some, or alters some or all, of the elements of informed consent set forth in paragraphs (b) and (c) of this section provided the IRB satisfies the requirements of paragraph (e)(3) of this section. An IRB may not omit or alter any of the requirements described in paragraph (a) of this section. If a broad consent procedure is used, an IRB may not omit or alter any of the elements required under paragraph (d) of this section.

(3) Requirements for waiver and alteration. In order for an IRB to waive or alter consent as described in this subsection, the IRB must find and document that:

(i) The research or demonstration project is to be conducted by or subject to the approval of state or local government officials and is designed to study, evaluate, or otherwise examine:

(A) Public benefit or service programs;

(B) Procedures for obtaining benefits or services under those programs;

(C) Possible changes in or alternatives to those programs or procedures; or

(D) Possible changes in methods or levels of payment for benefits or services under those programs; and

(ii) The research could not practicably be carried out without the waiver or alteration.

(f) General waiver or alteration of consent—(1) Waiver. An IRB may waive the requirement to obtain informed consent for research under paragraphs (a) through (c) of this section, provided the IRB satisfies the requirements of paragraph (f)(3) of this section. If an individual was asked to provide broad consent for the storage, maintenance, and secondary research use of identifiable private information or identifiable biospecimens in accordance with the requirements at paragraph (d) of this section, and refused to consent, an IRB cannot waive consent for the storage, maintenance, or secondary research use of the identifiable private information or identifiable biospecimens.

(2) Alteration. An IRB may approve a consent procedure that omits some, or alters some or all, of the elements of informed consent set forth in paragraphs (b) and (c) of this section provided the IRB satisfies the requirements of paragraph (f)(3) of this section. An IRB may not omit or alter any of the requirements described in paragraph (a) of this section. If a broad consent procedure is used, an IRB may not omit or alter any of the elements required under paragraph (d) of this section.

(3) Requirements for waiver and alteration. In order for an IRB to waive or alter consent as described in this subsection, the IRB must find and document that:

(i) The research involves no more than minimal risk to the subjects;

(ii) The research could not practicably be carried out without the requested waiver or alteration;

(iii) If the research involves using identifiable private information or identifiable biospecimens, the research could not practicably be carried out without using such information or biospecimens in an identifiable format;

(iv) The waiver or alteration will not adversely affect the rights and welfare of the subjects; and

(v) Whenever appropriate, the subjects or legally authorized representatives will be provided with additional pertinent information after participation.

(g) Screening, recruiting, or determining eligibility. An IRB may approve a research proposal in which an investigator will obtain information or biospecimens for the purpose of screening, recruiting, or determining the eligibility of prospective subjects without the informed consent of the prospective subject or the subject's legally authorized representative, if either of the following conditions are met:

(1) The investigator will obtain information through oral or written communication with the prospective subject or legally authorized representative, or

(2) The investigator will obtain identifiable private information or identifiable biospecimens by accessing records or stored identifiable biospecimens.

(h) Posting of clinical trial consent form. (1) For each clinical trial conducted or supported by a Federal department or agency, one IRB-approved informed consent form used to enroll subjects must be posted by the awardee or the Federal department or agency component conducting the trial on a publicly available Federal Web site that will be established as a repository for such informed consent forms.

(2) If the Federal department or agency supporting or conducting the clinical trial determines that certain information should not be made publicly available on a Federal Web site (e.g. confidential commercial information), such Federal department or agency may permit or require redactions to the information posted.

(3) The informed consent form must be posted on the Federal Web site after the clinical trial is closed to recruitment, and no later than 60 days after the last study visit by any subject, as required by the protocol.

(i) Preemption. The informed consent requirements in this policy are not intended to preempt any applicable Federal, state, or local laws (including tribal laws passed by the official governing body of an American Indian or Alaska Native tribe) that require additional information to be disclosed in order for informed consent to be legally effective.

(j) Emergency medical care. Nothing in this policy is intended to limit the authority of a physician to provide emergency medical care, to the extent the physician is permitted to do so under applicable Federal, state, or local law (including tribal law passed by the official governing body of an American Indian or Alaska Native tribe).

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.117 Documentation of informed consent.

(a) Except as provided in paragraph (c) of this section, informed consent shall be documented by the use of a written informed consent form approved by the IRB and signed (including in an electronic format) by the subject or the subject's legally authorized representative. A written copy shall be given to the person signing the informed consent form.

(b) Except as provided in paragraph (c) of this section, the informed consent form may be either of the following:

(1) A written informed consent form that meets the requirements of § 745.116. The investigator shall give either the subject or the subject's legally authorized representative adequate opportunity to read the informed consent form before it is signed; alternatively, this form may be read to the subject or the subject's legally authorized representative.

(2) A short form written informed consent form stating that the elements of informed consent required by § 745.116 have been presented orally to the subject or the subject's legally authorized representative, and that the key information required by § 745.116(a)(5)(i) was presented first to the subject, before other information, if any, was provided. The IRB shall approve a written summary of what is to be said to the subject or the legally authorized representative. When this method is used, there shall be a witness to the oral presentation. Only the short form itself is to be signed by the subject or the subject's legally authorized representative. However, the witness shall sign both the short form and a copy of the summary, and the person actually obtaining consent shall sign a copy of the summary. A copy of the summary shall be given to the subject or the subject's legally authorized representative, in addition to a copy of the short form.

(c)(1) An IRB may waive the requirement for the investigator to obtain a signed informed consent form for some or all subjects if it finds any of the following:

(i) That the only record linking the subject and the research would be the informed consent form and the principal risk would be potential harm resulting from a breach of confidentiality. Each subject (or legally authorized representative) will be asked whether the subject wants documentation linking the subject with the research, and the subject's wishes will govern;

(ii) That the research presents no more than minimal risk of harm to subjects and involves no procedures for which written consent is normally required outside of the research context; or

(iii) If the subjects or legally authorized representatives are members of a distinct cultural group or community in which signing forms is not the norm, that the research presents no more than minimal risk of harm to subjects and provided there is an appropriate alternative mechanism for documenting that informed consent was obtained.

(2) In cases in which the documentation requirement is waived, the IRB may require the investigator to provide subjects or legally authorized representatives with a written statement regarding the research.

(Approved by the Office of Management and Budget under Control Number 0990-0260)

§ 745.118 Applications and proposals lacking definite plans for involvement of human subjects.

Certain types of applications for grants, cooperative agreements, or contracts are submitted to Federal departments or agencies with the knowledge that subjects may be involved within the period of support, but definite plans would not normally be set forth in the application or proposal. These include activities such as institutional type grants when selection of specific projects is the institution's responsibility; research training grants in which the activities involving subjects remain to be selected; and projects in which human subjects' involvement will depend upon completion of instruments, prior animal studies, or purification of compounds. Except for research waived under § 745.101(i) or exempted under § 745.104, no human subjects may be involved in any project supported by these awards until the project has been reviewed and approved by the IRB, as provided in this policy, and certification submitted, by the institution, to the Federal department or agency component supporting the research.

§ 745.119 Research undertaken without the intention of involving human subjects.

Except for research waived under § 745.101(i) or exempted under § 745.104, in the event research is undertaken without the intention of involving human subjects, but it is later proposed to involve human subjects in the research, the research shall first be reviewed and approved by an IRB, as provided in this policy, a certification submitted by the institution to the Federal department or agency component supporting the research, and final approval given to the proposed change by the Federal department or agency component.

§ 745.120 Evaluation and disposition of applications and proposals for research to be conducted or supported by a Federal department or agency.

(a) The department or agency head will evaluate all applications and proposals involving human subjects submitted to the Federal department or agency through such officers and employees of the Federal department or agency and such experts and consultants as the department or agency head determines to be appropriate. This evaluation will take into consideration the risks to the subjects, the adequacy of protection against these risks, the potential benefits of the research to the subjects and others, and the importance of the knowledge gained or to be gained.

(b) On the basis of this evaluation, the department or agency head may approve or disapprove the application or proposal, or enter into negotiations to develop an approvable one.

§ 745.121 [Reserved]

§ 745.122 Use of Federal funds.

Federal funds administered by a Federal department or agency may not be expended for research involving human subjects unless the requirements of this policy have been satisfied.

§ 745.123 Early termination of research support: Evaluation of applications and proposals.

(a) The department or agency head may require that Federal department or agency support for any project be terminated or suspended in the manner prescribed in applicable program requirements, when the department or agency head finds an institution has materially failed to comply with the terms of this policy.

(b) In making decisions about supporting or approving applications or proposals covered by this policy the department or agency head may take into account, in addition to all other eligibility requirements and program criteria, factors such as whether the applicant has been subject to a termination or suspension under paragraph (a) of this section and whether the applicant or the person or persons who would direct or has/have directed the scientific and technical aspects of an activity has/have, in the judgment of the department or agency head, materially failed to discharge responsibility for the protection of the rights and welfare of human subjects (whether or not the research was subject to federal regulation).

§ 745.124 Conditions.

With respect to any research project or any class of research projects the department or agency head of either the conducting or the supporting Federal department or agency may impose additional conditions prior to or at the time of approval when in the judgment of the department or agency head additional conditions are necessary for the protection of human subjects.

PART 760 DOMESTIC URANIUM PROGRAM

§ 760.1 Uranium leases on lands controlled by DOE. (Domestic Uranium Program Circular No. 760.1, formerly (AEC) Domestic Uranium Program Circular 8, 10 CFR 60.8).

(a) What this section does. This section sets forth regulations governing the issuance of leases to permit the exploration for and mining of deposits containing uranium in public lands withdrawn from entry and location under the general mining laws for use of DOE, and in certain other lands under DOE control.

(b) Statutory authority. The Atomic Energy Act of 1954, as amended (68 Stat. 919, 42 U.S.C. 2011 et seq.) is the authority for this section.

(c) Who may hold leases. Only parties who are (1) citizens of the United States; (2) associations of such citizens; or (3) corporations organized under the laws of the United States or territories thereof, are eligible lessees under this section. Persons under 21 years of age or employees of DOE are not eligible.

(d) Issuance of leases through competitive bidding. Except under special circumstances as provided in paragraph (u) of this section, each lease will be offered through competitive bidding and, except as otherwise provided in this paragraph (d), will be issued to the acceptable bidder offering the highest bid. The bid may be on a cash bonus, royalty bonus, or other basis as specified in the invitation to bid. Invitations to bid on some of the lands may be limited to small business concerns as defined by the Small Business Administration, and such invitations may limit the number of leases to be awarded to each bidder. In such cases DOE will accept those bids which, in relation to other bids received pursuant to the invitation, are most advantageous to the Government. Before any lease is awarded, DOE may require high bidders to submit a detailed statement of the facts as to such matters as their experience, organization, and financial resources. DOE reserves the right to reject any and all bids.

(e) Solicitation of bids. Announcements of the availability of invitations to bid for a lease will be publicly posted and published. Copies of such announcements will also be mailed to parties who submit to DOE's Grand Junction, Colorado, Office subsequent to publication in the Federal Register of this (DOE) Domestic Uranium Program Circular 760.1, written requests that their names be placed on a mailing list for receipt of such announcements. The invitations containing information for preparation and submission of bids will be available at the Grand Junction Office, and will be mailed only on specific written request, following announcement of their availability. Invitations will specify the land to be leased, the basis on which bids are to be submitted, the amount of the monetary deposit which must be transmitted with the bid, the place and time the bids will be publicly opened, the term, royalty and other payments, performance requirements, and other payments, performance requirements, and other conditions which will become a part of the lease. In addition, data which have been assembled pertaining to the lands to be leased will be available for public inspection at the Grand Junction Office; copies will also be available for purchase.

(f) Bidding requirements; deposits. All bids must be filed at the place and prior to the time set forth in the invitation. Each bid must be sealed and accompanied by a deposit, in the form of a certified check, cashier's check, or bank draft, in an amount as specified in the invitation to bid. Deposits of unsuccessful bidders will be returned. If the bidder is an individual, he must submit with his bid a statement of his citizenship and age. If the bidder is an association (including a partnership), the bid shall be accompanied by a certified copy of the articles of association together with a statement as to the citizenship and age of its members. If the bidder is a corporation, evidence that the officer signing the bid had authority to do so and a statement as to the State of incorporation shall also be submitted.

(g) Awarding of lease. Following public opening of the bids, DOE, subject to the right to reject any and all bids, will determine the successful bidder. In the event the highest acceptable bids are tie bids, a public drawing will be held by DOE to determine the successful bidder. After notice of award and within the time period prescribed in the invitation, the successful bidder shall execute and return to DOE three (3) copies of the lease and shall remit payments due as prescribed in the invitation. Should the successful bidder fail to execute the lease, or make payments as required, in accordance with the terms of the invitation, or fail to otherwise comply with applicable regulations, he may be required to forfeit any payments previously made, and lose any further right or interest in the lease. In such event, DOE may offer the lease to the next highest acceptable bidder, reoffer the lease for bidding, or take such other action as appropriate. If the awarded lease is executed by the bidder through an agent, evidence of authorization must be submitted.

(h) Dating of lease. A lease issued under this section will ordinarily be effective as of the date it is signed on behalf of DOE.

(i) Term of lease. A lease shall be for the period specified in the invitation to bid. When deemed desirable by DOE, the lease will provide that the lease term may be extended at the option of the lessee for a specified period and upon stipulated conditions.

(j) Payments to DOE under lease. Royalty payments shall be specified in the invitation to bid; base royalty, minimum royalty, advance royalty, and rental payments, or a combination thereof may be required.

(k) Title to unshipped ore. DOE, unless it approves otherwise, reserves all right and title to property in and to all ores and other uranium- or vanadium-bearing material not removed from the leased premises within 60 days after expiration or other termination of the lease. Unless DOE approves otherwise, all material mined from the leased premises and not marketed by the lessee shall remain on the leased premises.

(l) Environmental controls. Each lease will contain such provisions as may be deemed necessary by DOE with respect to the lessee's use of the leased lands. DOE may require periodic submission of plans for exploration and mining activities including provisions for control of environmental impact. The lessee will be required to conduct operations so as to minimize adverse environmental effects, to comply with all applicable State and Federal statutes and regulations and to the extent stipulated in the lease agreement, will be held responsible for maintenance or rehabilitation of affected areas in accordance with plans submitted to and approved by DOE.

(m) Performance requirements. A lease shall require that exploration, development, and mining activities, as appropriate, be conducted on the leased premises with reasonable diligence, skill, and care as required to achieve and maintain production of uranium ore at rates consistent with good and safe mining practice and with market conditions.

(n) Health and safety requirements. A lease (1) shall require that exploration, development, and mining activities, as appropriate, be conducted on the leased premises with due regard for the health and safety of those involved, and (2) shall include appropriate measures for the control of radiation exposure in the mines.

(o) Lessee's records. Leases shall provide that the lessee keep and make available to DOE such records as DOE deems necessary for the administration of the lease and its leasing program.

(p) Rights of DOE. DOE reserves the right to enter upon the leased property and into all parts of the mine for inspection and other purposes. DOE also reserves the right to grant to other persons easements or rights of way upon, through, or in the leased premises. DOE and the Comptroller General of the United States or any of his duly authorized representatives shall, until the expiration of 3 years after termination or expiration of lease, have access to and the right to examine any directly pertinent books, papers, and records of the lessee involving transactions related to the lease.

(q) Relinquishment of leases. A lease may be surrendered by the lessee upon filing with and approval by DOE of a written application for relinquishment. Approval of the application shall be contingent upon the delivery of the leased premises to DOE in a condition determined to be satisfactory to DOE. The lessee shall continue to be liable for the payment of all royalty and other debts due DOE.

(r) Assignment of leases. Any transfer of a lease or any interest therein or claim thereunder, will not be recognized unless and until approved by DOE in writing. Ordinarily, DOE will not approve any transfer of a lease which involves overriding royalties or deferred payments of any kind to the transferor.

(s) Cancellation. Any lease may be cancelled by DOE whenever the lessee fails to comply with the provisions of the lease. Failure of DOE to exercise its right to cancel shall not be deemed a waiver thereof.

(t) Form of lease. Leases will be issued on forms prescribed by DOE.

(u) Noncompetitive leases. Under special circumstances, where DOE believes it to be in the best interest of the Government, DOE at its discretion may award or extend leases on the basis of negotiation.

(v) DOE decisions. All matters connected with the issuance and administration of leases will be determined by DOE whose decisions shall be final and conclusive.

(w) Definitions. DOE as used in this section means the United States Department of Energy or its duly authorized representative or representatives.

(x) Multiple use of land. Leases issued under this section shall provide that operations under them will be conducted so as not to interfere with the lawful operations of any third party having a lease, permit, easement, or other right or interest in the premises.

(y) Compliance with State and Federal regulations. Every lease shall provide that the lessee is required to comply with all applicable State and Federal statutes and regulations.

(Secs. 66, 161, 68 Stat. 933, 948, as amended; 42 U.S.C. 2096, 2201)

[41 FR 56783, Dec. 30, 1976]

PART 765 REIMBURSEMENT FOR COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES

Authority: 42 U.S.C. 2296a et seq.

Source: 59 FR 26726, May 23, 1994, unless otherwise noted.

Subpart A General

§ 765.1 Purpose.

The provisions of this part establish regulatory requirements governing reimbursement for certain costs of remedial action at active uranium or thorium processing sites as specified by Subtitle A of Title X of the Energy Policy Act of 1992. These regulations are authorized by section 1002 of the Act (42 U.S.C. 2296a-1), which requires the Secretary to issue regulations governing the reimbursements.

§ 765.2 Scope and applicability.

(a) This part establishes policies, criteria, and procedures governing reimbursement of certain costs of remedial action incurred by licensees at active uranium or thorium processing sites as a result of byproduct material generated as an incident of sales to the United States.

(b) Costs of remedial action at active uranium or thorium processing sites are borne by persons licensed under section 62 or 81 of the Atomic Energy Act (42 U.S.C. 2092, 2111), either by NRC or an Agreement State pursuant to a counterpart to section 62 or 81 of the Atomic Energy Act, under State law, subject to the exceptions and limitations specified in this part.

(c) The Department shall, subject to the provisions specified in this part, reimburse a licensee, of an active uranium or thorium processing site for the portion of the costs of remedial action as are determined by the Department to be attributable to byproduct material generated as an incident of sales to the United States and either incurred by the licensee not later than December 31, 2007, or incurred by the licensee in accordance with a plan for subsequent remedial action approved by the Department.

(d) Costs of remedial action are reimbursable under Title X for decontamination, decommissioning, reclamation, and other remedial action, provided that claims for reimbursement are supported by reasonable documentation as specified in subpart C of this part.

(e) Except as authorized by § 765.32, the total amount of reimbursement paid to any licensee of an active uranium processing site shall not exceed $6.25 multiplied by the number of Federal-related dry short tons of byproduct material. This total amount shall be adjusted for inflation pursuant to section 765.12.

(f) The total amount of reimbursement paid to all active uranium processing site licensees shall not exceed $350 million. This total amount shall be adjusted for inflation by applying the CPI-U, as provided by § 765.12.

(g) The total amount of reimbursement paid to the licensee of the active thorium processing site shall not exceed $365 million, as adjusted for inflation by applying the CPI-U as provided by § 765.12.

(h) Reimbursement of licensees for costs of remedial action will only be made for costs that are supported by reasonable documentation as required by § 765.20 and claimed for reimbursement by a licensee in accordance with the procedures established by subpart C of this part.

(i) The $715 million aggregate amount authorized to be appropriated under section 1003(a) of the Act (42 U.S.C. 2296a-2(a)) shall be adjusted for inflation by applying the CPI-U as provided by § 765.12, and shall be provided from the Fund.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

§ 765.3 Definitions.

For the purposes of this part, the following terms are defined as follows:

Active uranium or thorium processing site or active processing site means:

(1) Any uranium or thorium processing site, including the mill, containing byproduct material for which a license, issued either by NRC or by an Agreement State, for the production at a site of any uranium or thorium derived from ore—

(i) Was in effect on January 1, 1978;

(ii) Was issued or renewed after January 1, 1978; or

(iii) For which an application for renewal or issuance was pending on, or after January 1, 1978; and

(2) Any other real property or improvement on such real property that is determined by the Secretary or by an Agreement State to be:

(i) In the vicinity of such site; and

(ii) Contaminated with residual byproduct material.

Agreement State means a State that is or has been a party to a discontinuance agreement with NRC under section 274 of the Atomic Energy Act (42 U.S.C. 2021) and thereafter issues licenses and establishes remedial action requirements pursuant to a counterpart to section 62 or 81 of the Atomic Energy Act under state law.

Atomic Energy Act means the Atomic Energy Act of 1954, as amended, (42 U.S.C. 2011 et seq.).

Byproduct material means the tailings or wastes produced by the extraction or concentration of uranium or thorium from any ore processed primarily for its source material content.

Claim for reimbursement means the submission of an application for reimbursement in accordance with the requirements established in subpart C of this part.

Costs of remedial action means costs incurred by a licensee prior to or after enactment of UMTRCA to perform decontamination, decommissioning, reclamation, and other remedial action. These costs may include but are not necessarily limited to expenditures for work necessary to comply with applicable requirements to conduct groundwater remediation, treatment or containment of contaminated soil, disposal of process wastes, removal actions, air pollution abatement measures, mill and equipment decommissioning, site monitoring, administrative activities, expenditures required to meet necessary regulatory standards, or other requirements established by NRC, or an Agreement State. Costs of remedial action must be supported by reasonable documentation in accordance with the requirements of subpart C of this part.

Decontamination, decommissioning, reclamation, and other remedial action means work performed which is necessary to comply with all applicable requirements of UMTRCA or, where appropriate, with applicable requirements established by an Agreement State.

Department means the United States Department of Energy or its authorized agents.

Dry short tons of byproduct material means the quantity of tailings generated from the extraction and processing of 2,000 pounds of uranium or thorium ore-bearing rock.

Federal reimbursement ratio means the ratio of Federal-related dry short tons of byproduct material to total dry short tons of byproduct material present at an active uranium or thorium processing site on October 24, 1992. The ratio shall be established by comparing Federal-related dry short tons of byproduct material to total dry short tons of byproduct material present at the site on October 24, 1992, or by another means of attributing costs of remedial action to byproduct material generated as an incident of sales to the United States which the Department determines is more accurate than a ratio established using dry short tons of byproduct material.

Federal-related dry short tons of byproduct material means dry short tons of byproduct material that was present at an active uranium or thorium processing site on October 24, 1992, and was generated as an incident of uranium or thorium sales to the United States.

Generally accepted accounting principles means those principles established by the Financial Accounting Standards Board which encompass the conventions, rules, and procedures necessary to define accepted accounting practice at a particular time.

Inflation index means the consumer price index for all urban consumers (CPI-U) as published by the Department of Commerce's Bureau of Labor Statistics.

Licensee means a site owner licensed under section 62 or 81 of the Atomic Energy Act (42 U.S.C. 2092, 2111) by NRC, or an Agreement State, for any activity at an active uranium or thorium processing site which results, or has resulted, in the production of byproduct material.

Maximum reimbursement amount or maximum reimbursement ceiling means the smaller of the following two quantities:

(1) The amount obtained by multiplying the total cost of remedial action at the site, as determined in the approved plan for subsequent remedial action, by the Federal reimbursement ratio established for the site; or

(2) $6.25, as adjusted for inflation, multiplied by the number of Federal-related dry short tons of byproduct material.

NRC means the United States Nuclear Regulatory Commission or its predecessor agency.

Offsite disposal means the disposal, and activities that contribute to the disposal, of byproduct material in a location that is not contiguous to the West Chicago Thorium Mill Site located in West Chicago, Illinois, in accordance with a plan approved by, or other written authorization from, the State of Illinois or NRC provided the activities are consistent with the ultimate removal of byproduct material from the West Chicago Thorium Mill Site.

Plan for subsequent remedial action means a plan approved by the Department which includes an estimated total cost and schedule for remedial action, and all applicable requirements of remedial action established by NRC or an Agreement State to be performed after December 31, 2007, at an active uranium or thorium processing site.

Reclamation plan or site reclamation plan means a plan, which has been approved by NRC or an Agreement State, for remedial action at an active processing site that establishes the work necessary to comply with applicable requirements of UMTRCA, or where appropriate with requirements established by an Agreement State.

Remedial action means decontamination, decommissioning, reclamation, and other remedial action at an active uranium or thorium processing site.

Secretary means the Secretary of Energy or her designees.

Site owner means a person that presently holds, or held in the past, any interest in land, including but not limited to a fee simple absolute, surface or subsurface ownership of mining claims, easements, and a right of access for the purposes of cleanup, or any other legal or equitable interest.

Tailings means the remaining portion of a metal-bearing ore after some or all of the metal, such as uranium, has been extracted.

The Fund means the Uranium Enrichment Decontamination and Decommissioning Fund established at the United States Department of Treasury pursuant to section 1801 of the Atomic Energy Act (42 U.S.C. 2297g).

Title X or “the Act” means Subtitle A of Title X of the Energy Policy Act of 1992, Public Law 102-486, 106 Stat. 2776 (42 U.S.C. 2296a-1 et seq.).

UMTRCA means the Uranium Mill Tailings Radiation Control Act of 1978, as amended (42 U.S.C. 7901 et seq.).

United States means any executive department, commission, or agency, or other establishment in the executive branch of the Federal Government.

Written Authorization means a written statement from either the NRC or an Agreement State that a licensee has performed in the past, or is authorized to perform in the future, a remedial action that is necessary to comply with the requirements of UMTRCA or, where appropriate, the requirements of an Agreement State.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

Subpart B Reimbursement Criteria

§ 765.10 Eligibility for reimbursement.

(a) Any licensee of an active uranium or thorium processing site that has incurred costs of remedial action for the site that are attributable to byproduct material generated as an incident of sales to the United States shall be eligible for reimbursement of these costs, subject to the procedures and limitations specified in this part.

(b) Prior to reimbursement of costs of remedial action incurred by a licensee, the Department shall make a determination regarding the total quantity of dry short tons of byproduct material, and the quantity of Federal-related dry short tons of byproduct material present on October 24, 1992 at the licensee's active processing site. A claim for reimbursement from a site for which a determination is made will be evaluated individually. If a licensee does not concur with the Department's determination regarding the quantity of dry short tons of byproduct material present at the site, the licensee may appeal the Department's determination in accordance with § 765.22 of this part. The Department's determination shall be used to determine that portion of an approved claim for reimbursement submitted by the licensee which shall be reimbursed, unless or until the determination is overturned on appeal. If the outcome of an appeal requires a change in the Department's initial determination, the Department will adjust any payment previously made to the licensee to reflect the change.

§ 765.11 Reimbursable costs.

(a) Costs for which a licensee may be reimbursed must be for remedial action that a licensee demonstrates is attributable to byproduct material generated as an incident of sales to the United States, as determined by the Department. These costs are equal to the total costs of remedial action at a site multiplied by the Federal reimbursement ratio established for the site. These costs must be incurred in the performance of activities, prior to or after enactment of UMTRCA, and required by a plan, portion thereof, or other written authorization, approved by NRC or by an Agreement State. Costs of remedial action shall be reimbursable only if approved by the Department in accordance with the provisions of this part.

(b) In addition, costs of remedial action incurred by a licensee after December 31, 2007 must be in accordance with a plan for subsequent remedial action approved by the Department as specified in § 765.30.

(c) Total reimbursement of costs of remedial action incurred at an active processing site that are otherwise reimbursable pursuant to the provisions of this part shall be limited as follows:

(1) Reimbursement of costs of remedial action to active uranium processing site licensees shall not exceed $6.25, as adjusted for inflation, multiplied by the number of Federal-related dry short tons of byproduct material.

(2) Aggregate reimbursement of costs of remedial action incurred at all active uranium processing sites shall not exceed $350 million. This aggregate amount shall be adjusted for inflation pursuant to § 765.12; and

(3) Reimbursement of costs of remedial action at the active thorium processing site shall be limited to costs incurred for offsite disposal and shall not exceed $365 million. This amount shall be adjusted for inflation pursuant to § 765.12.

(d) Notwithstanding the Title X requirement that byproduct material must be located at an active processing site on October 24, 1992, byproduct material moved from the Edgemont Mill in Edgemont, South Dakota, to a disposal site as a result of remedial action, shall be eligible for reimbursement in accordance with all applicable requirements of this part.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

§ 765.12 Inflation index adjustment procedures.

(a) The amounts of $6.25 (as specified in § 765.2(e) of this rule) $350 million (as specified in § 765.2(f) of this rule), $365 million (as specified in § 765.2(g) of this rule) and $715 million (as specified in § 765.2(i) of this rule) shall be adjusted for inflation as provided by this section.

(b) To make adjustments for inflation to the amounts specified in paragraph (a) of this section, the Department shall apply the CPI-U to these amounts annually, beginning in 1994, using the CPI-U as published by the Bureau of Labor Statistics within the Department of Commerce for the preceding calendar year.

(c) The Department shall adjust annually, using the CPI-U as defined in this part, amounts paid to an active uranium processing site licensee for purposes of comparison with the $6.25 per dry short ton limit on reimbursement as adjusted for inflation.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

Subpart C Procedures for Submitting and Processing Reimbursement Claims

§ 765.20 Procedures for submitting reimbursement claims.

(a) All costs of remedial action for which reimbursement is claimed must be supported by reasonable documentation as specified in this subpart. The Department reserves the right to deny any claim for reimbursement, in whole or in part, that is not submitted in accordance with the requirements of this subpart.

(b) The licensee shall provide a copy of the approved site reclamation plan or other written authorization from NRC or an Agreement State upon which claims for reimbursement are based, with the initial claim submitted. Any revision or modification made to the plan or other written authorization, which is approved by NRC or an Agreement State, shall be included by the licensee in the next claim submitted to the Department following that revision or modification. This reclamation plan or other written authorization, as modified or revised, shall serve as the basis for the Department's evaluation of all claims for reimbursement submitted by a licensee.

(c) Each submitted claim shall provide a summary of all costs of remedial action for which reimbursement is claimed. This summary shall identify the costs of remedial action associated with each major activity or requirement established by the site's reclamation plan or other written authorization. In addition, each claim shall provide a summary of the documentation relied upon by the licensee in support of each cost category for which reimbursement is claimed.

(d) Documentation used to support a reimbursement claim must demonstrate that the costs of remedial action for which reimbursement is claimed were incurred specifically for activities specified in the site's reclamation plan, or otherwise authorized by NRC or an Agreement State. Summary documentation used in support of a claim must be cross-referenced to the relevant page and activity of the licensee's reclamation plan, or other written authorization approved by NRC or an Agreement State.

(1) Documentation prepared contemporaneous to the time the cost was incurred should be used when available. The documentation should identify the date or time period for which the cost was incurred, the activity for which the cost was incurred, and the reclamation plan provision or other written authorization to which the cost relates. Where available, each claim should be supported by receipts, invoices, pay records, or other documents that substantiate that each specific cost for which reimbursement is claimed was incurred for work that was necessary to comply with UMTRCA or applicable Agreement State requirements.

(2) Documentation not prepared contemporaneous to the time the cost was incurred, or not directly related to activities specified in the reclamation plan or other written authorization, may be used in support of a claim for reimbursement provided that the licensee determines the documentation is the only means available to document costs for which reimbursement is sought.

(e) The Department may audit, or require the licensee to audit, any documentation used to support a claim on a case-by-case basis and may approve, approve in part, or deny reimbursement of any claim in accordance with the requirements of this part. Documentation relied upon by a licensee in support of a claim for reimbursement shall be made available to the Department and retained by the licensee until 4 years after final payment of a claim is made by the Department.

(f) Each licensee should utilize generally accepted accounting principles consistently throughout the claim. These accounting principles, underlying assumptions, and any other information necessary for the Department to evaluate the claim shall be set forth in each claim.

(g) Following each annual appropriation by Congress, the Department will issue a Federal Register Notice announcing:

(1) A claim submission deadline for that fiscal year;

(2) Availability of funds for reimbursement of costs of remedial action;

(3) Whether the Department anticipates that approved claims for that fiscal year may be subject to prorated payment;

(4) Any changes in the Federal reimbursement ratio or maximum reimbursement ceiling for any active uranium or thorium processing site;

(5) Any revision in the per dry short ton limit on reimbursement for all active uranium processing sites; and

(6) Any other relevant information.

(h) A licensee shall certify, with respect to any claim submitted by it for reimbursement, that the work was completed as described in an approved reclamation plan or other authorization. In addition, the licensee shall certify that all costs for which reimbursement is claimed, all documentation relied upon in support of its costs, and all statements or representations made in the claim are complete, accurate, and true. The certification shall be signed by an officer or other official of the licensee with knowledge of the contents of the claim and authority to represent the licensee in making the certification. Any knowingly false or frivolous statements or representations may subject the individual to penalties under the False Claims Act, sections 3729 through 3731 of title 31 United States Code, or any other applicable statutory authority; and criminal penalties under sections 286, 287, 1001 and 1002 of title 18, United States Code, or any other applicable statutory authority.

(i) All claims for reimbursement submitted to the Department shall be sent by registered or certified mail, return receipt requested. The Department reserves all rights under applicable law to recover any funds paid to licensees which an audit finds to not meet the requirements of this part.

§ 765.21 Procedures for processing reimbursement claims.

(a) The Department will conduct a preliminary review of each claim within 60 days after the claim submission deadline announced in the Federal Register Notice specified in § 765.20(g) to determine the completeness of each claim. Payments from the Fund to active uranium or thorium processing site licensees for approved costs of remedial action will be made simultaneously by the Department within 1 year of the claim submission deadline.

(b) After completing the preliminary review specified in paragraph (a) of this section, the Department may audit, or require the licensee to audit, any documentation used in support of such claim, request the licensee to provide additional information, or request the licensee to provide other clarification determined by the Department to be necessary to complete its evaluation of the claim. In addition, the Department reserves the right to conduct an inspection of the site to verify any information provided by the licensee in a claim for reimbursement, or in support thereof. Any information requested by the Department, if provided, must be submitted by the claimant within 60 days of receipt of the request unless the Department specifies in writing that additional time is provided.

(c) At any time during the review of a claim, the Department may request an informal conference with a licensee to obtain further information or clarification on any unresolved issue pertaining to the claim. While the licensee is not required to provide additional clarification requested by the Department, a failure to do so may result in the denial of that portion of the claim for which information is requested.

(d) Based upon the claim submitted and any additional information received by the Department, including any audit or site inspection if conducted, the Department shall complete a final review of all relevant information prior to making a reimbursement decision. When the Department determines it is not clear that an activity for which reimbursement is claimed was necessary to comply with UMTRCA or where appropriate, with applicable Agreement State requirements, the Department may consult with the appropriate regulatory authorities.

(e) A written decision regarding the Department's determination to approve, approve in part, or deny a claim will be provided to the licensee within 10 days of completion of the claim review. Within 45 days after the Department's issuance of a written decision to deny the claim due to inadequate documentation, the licensee may request the Department to reconsider its decision if the licensee provides reasonable documentation in accordance with § 765.20. If a licensee chooses not to submit the documentation, the licensee has the right to file a formal appeal to a claim denial in accordance with § 765.22. If a licensee chooses to submit the documentation, the Department will consider whether the documentation results in the Department's reversal of the initial decision to deny the claim and will inform the licensee of the Department's subsequent decision. The licensee may appeal that decision in accordance with § 765.22.

(f) If the Department determines that insufficient funds are available at any time to provide for complete payment of all outstanding approved claims, reimbursements of approved claims will be made on a prorated basis. A prorated payment of all outstanding approved claims for reimbursement, or any unpaid portion thereof, shall be made on the basis of the total amount of all outstanding approved claims, regardless of when the claims were submitted or approved.

(g) Notwithstanding the provisions of paragraph (f) of this section, or any other provisions of this part, any requirement for the payment or obligation of funds by the Department established by this part shall be subject to the availability of appropriated funds, and no provision herein shall be interpreted to require obligation or payment of funds in violation of the Anti-Deficiency Act (31 U.S.C. 1341).

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

§ 765.22 Appeals procedures.

(a) Any appeal by a licensee of any Department determination subject to the requirements of this part, shall invoke the appeals process specified in paragraph (b) of this section.

(b) A licensee shall file an appeal of any Department determination subject to the requirements of this part with the Office of Hearings and Appeals, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585. Any appeal must be filed within 45 days from the date the licensee received notice, actual or constructive (i.e., publication in the Federal Register), of the Department's determination. Appeals must comply with the procedures set forth in 10 CFR part 1003, subpart C. The decision of the Office of Hearings and Appeals shall be the final decision of the Department. A licensee must file an appeal in order to exhaust its administrative remedies, and the receipt of an appellate decision is a prerequisite to seeking judicial review of any determination made under this part.

[59 FR 26726, May 23, 1994, as amended at 60 FR 15017, Mar. 21, 1995]

§ 765.23 Annual report.

The Department shall prepare annually a report summarizing pertinent information concerning claims submitted in the previous calendar year, the status of the Department's review of the claims, determinations made regarding the claims, amounts paid for claims approved, and other relevant information concerning this reimbursement program. The report will be available to all interested parties upon written request to the Department's National Nuclear Security Administration Service Center, Office of Technical Services, Environmental Programs Department, P.O. Box 5400, Albuquerque, NM 87185-5400 and will also be available in the Department's Freedom of Information Reading room, 1000 Independence Avenue SW., Washington, DC.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

Subpart D Additional Reimbursement Procedures

§ 765.30 Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

(a) This section establishes procedures governing reimbursements of costs of remedial action incurred in accordance with a plan for subsequent remedial action approved by the Department as provided in this section. Costs otherwise eligible for reimbursement in accordance with the terms of this part and incurred in accordance with the plan shall be reimbursed in accordance with the provisions of subpart D and subpart C. In the event there is an inconsistency between the requirements of subpart D and subpart C, the provisions of subpart D shall govern reimbursement of such costs of remedial action.

(b) A licensee who anticipates incurring costs of remedial action after December 31, 2007 may submit a plan for subsequent remedial action. This plan may be submitted at any time after January 1, 2005, but no later than December 31, 2006. Reimbursement of costs of remedial action incurred after December 31, 2007 shall be subject to the approval of this plan by the Department. This plan shall describe:

(1) All applicable requirements established by NRC pursuant to UMTRCA, or where appropriate, by the requirements of an Agreement State, included in a reclamation plan approved by NRC or an Agreement State which have not yet been satisfied in full by the licensee, and

(2) The total cost of remedial action required at the site, together with all necessary supporting documentation, segregated into actual costs incurred to date, costs incurred or expected to be incurred prior to December 31, 2007 but not yet approved for reimbursement, and anticipated future costs.

(c) The Department shall review the plan for subsequent remedial action to verify conformance with the NRC- or Agreement State-approved reclamation plan or other written authorization, and to determine the reasonableness of anticipated future costs, and shall approve, approve with suggested modifications, or reject the plan. During its review, the Department may request additional information from the licensee to clarify or provide support for any provision or estimate contained in the plan. The Department may also consult with NRC or an Agreement State concerning any provision or estimate contained in the plan. Upon approval, approval with modifications, or rejection of a plan, the Department shall inform and explain to the licensee its decision.

(d) If the Department rejects a plan for subsequent remedial action submitted by a licensee, the licensee may appeal the Department's rejection or prepare and submit a revised plan. The licensee may continue to submit revised plans for subsequent remedial action until the Department approves a plan, or September 30, 2007, whichever occurs first. A failure by a licensee to receive approval from the Department of a plan prior to December 31, 2007 will preclude that licensee from receiving any reimbursement for costs of remedial action incurred after that date.

(e) The Department shall determine, in approving a plan for subsequent remedial action, the maximum reimbursement amount for which the licensee may be eligible. This maximum reimbursement amount shall be the smaller of the following two quantities:

(1) The amount obtained by multiplying the total cost of remedial action at the site, as determined in the approved plan for subsequent remedial action, by the Federal reimbursement ratio established for such site; or

(2) For the uranium site licensees only, $6.25, as adjusted for inflation, multiplied by the number of Federal-related dry short tons of byproduct material. For all licensees, the Department shall subtract from the maximum reimbursement amount any reimbursement already approved to be paid to the licensee. The resulting sum shall be the potential additional reimbursement to which the licensee may be entitled. This resulting sum will be adjusted after the approval of claims for work performed through December 31, 2007, to reflect the actual approved costs of work performed through that date.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

§ 765.31 Designation of funds available for subsequent remedial action.

(a) The Department shall authorize reimbursement of costs of remedial action, incurred in accordance with an approved plan for subsequent remedial action and approved by the Department as specified in subpart C to this part, to be made from the Fund. These costs are reimbursable until:

(1) This remedial action has been completed, or

(2) The licensee has been reimbursed its maximum reimbursement amount as determined by the Department pursuant to paragraph (e) of § 765.30.

(b) A licensee shall submit any claim for reimbursement of costs of remedial action incurred pursuant to an approved plan for subsequent remedial action in accordance with the requirements of subpart C of this part. The Department shall approve, approve in part, or deny any claims in accordance with the procedures specified in subpart C of this part. The Department shall authorize the disbursement of funds upon approval of a claim for reimbursement.

(c) After all remedial actions have been completed by affected Agreement State or NRC licensees, the Department will issue a Federal Register notice announcing a termination date beyond which claims for reimbursement will no longer be accepted.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32958, June 3, 2003]

§ 765.32 Reimbursement of excess funds.

(a) No later than December 31, 2008, the Department shall determine if the aggregate amount authorized for appropriation pursuant to section 1003 of the Act (42 U.S.C. 2296a-2), as adjusted for inflation pursuant to § 765.12, exceed as of that date the combined total of all reimbursements which have been paid to licensees under this part, any amounts approved for reimbursement and owed to any licensee, and any anticipated additional reimbursements to be made in accordance with approved plans for subsequent remedial action.

(b) If the Department determines that the amount authorized pursuant to section 1003 of the Act (42 U.S.C. 2296a-2), as adjusted for inflation, exceed the combined total of all reimbursements (as indicated in paragraph (a) of this section), the Department may establish procedures for providing additional reimbursement to uranium licensees for costs of remedial action, subject to the availability of appropriated funds. If the amount of available excess funds is insufficient to provide reimbursement of all eligible costs of remedial action, then reimbursement shall be paid on a prorated basis.

(c) Each eligible uranium licensee's prorated share will be determined by dividing the total excess funds available by the total number of Federal-related dry short tons of byproduct material present at the site where costs of remedial action exceed $6.25 per dry short ton, as adjusted for inflation pursuant to § 765.12. The resulting number will be the maximum cost per dry short ton, over $6.25, that may be reimbursed. Total reimbursement for each licensee that has incurred approved costs of remedial action in excess of $6.25 per dry short ton will be the product of the excess cost per dry short ton multiplied by the number of Federal-related dry short tons of byproduct material at the site or the actual costs incurred and approved by the Department, whichever is less.

(d) Any costs of remedial action for which reimbursement is sought from excess funds determined by the Department to be available is subject to all requirements of this part except the per dry short ton limit on reimbursement established by paragraph (d) of § 765.11.

[59 FR 26726, May 23, 1994, as amended at 68 FR 32957, June 3, 2003]

PART 766 URANIUM ENRICHMENT DECONTAMINATION AND DECOMMISSIONING FUND; PROCEDURES FOR SPECIAL ASSESSMENT OF DOMESTIC UTILITIES

Authority: 42 U.S.C. 2201, 2297g, 2297g-1, 2297g-2, 7254.

Source: 59 FR 41963, Aug. 15, 1994, unless otherwise noted.

Subpart A General

§ 766.1 Purpose.

The provisions of this part establish procedures for the Special Assessment of domestic utilities for the Uranium Enrichment Decontamination and Decommissioning Fund pursuant to sections 1801, 1802 and 1803 of the Atomic Energy Act of 1954, as amended (42 U.S.C. § 2011 et seq.).

§ 766.2 Applicability.

This part applies to all domestic utilities in the United States that purchased separative work units from the DOE between 1945 and October 23, 1992.

§ 766.3 Definitions.

For the purposes of this part, the following terms shall be defined as follows:

CPI-U means the Consumer Price Index for all-urban consumers published by the Department of Labor.

Commercial electricity generation means the production of electricity for sale to consumers.

DOE means the United States Department of Energy and its predecessor agencies.

Domestic utility means any utility in the United States that has purchased SWUs produced by DOE for the purpose of commercial electrical generation during the period beginning in 1945 to October 23, 1992.

Fund means an account in the U.S. Treasury referred to as the Uranium Enrichment Decontamination and Decommissioning Fund, established by section 1801 of the Atomic Energy Act of 1954, as amended.

Oak Ridge Operations Office means the Oak Ridge Operations Office of the Department of Energy in Oak Ridge, Tennessee.

Special Assessment means the Special Assessment levied on domestic utilities for payments into the Fund.

SWU means a separative work unit, the common measure by which uranium enrichment services are sold.

TESS means the Toll Enrichment Services System, which is the database that tracks uranium enrichment services transactions of the DOE Oak Ridge Operations Office for the purpose of planning, toll transaction processing, customer invoicing and historical tracking of SWU deliveries.

Use and burnup charges mean lease charges for the consumption of SWUs and natural uranium.

Subpart B Procedures for Special Assessment

§ 766.100 Scope.

This subpart sets forth the procedures for the Special Assessment of domestic utilities for funds to be deposited in the Fund.

§ 766.101 Data utilization.

DOE shall use the records from the Toll Enrichment Services System (TESS) and other records maintained by the Oak Ridge Operations Office in order to determine the total SWUs purchased from DOE for all purposes. DOE shall use records from TESS, relevant records of domestic utilities, and such other information as DOE deems to be reliable and probative in determining the number of SWUs that were purchased by each domestic utility prior to October 24, 1992. A domestic utility shall be considered to have purchased a SWU from DOE if the SWU was produced by DOE but purchased by the domestic utility from another source. DOE shall consider a purchase to have occurred upon the delivery of a SWU to the domestic utility purchasing the SWU. A domestic utility shall not be considered to have purchased a SWU from DOE if the SWU was purchased by the domestic utility but subsequently sold to another source.

§ 766.102 Calculation methodology.

(a) Calculation of Domestic Utilities' Annual Assessment Ratio to the Fund. Domestic utilities shall be assessed annually for their share of the Fund. The amount of the assessment shall be determined by the ratio of SWUs produced by DOE and purchased by domestic utilities prior to October 24, 1992, to the total number of SWUs produced by DOE for all purposes (including SWUs produced for defense purposes). All calculations will be carried out to the fifth significant digit. This ratio is expressed by the following hypothetical example:

SWUs purchased by all domestic utilities | Total SWUs produced—all purposes | Special assessment ratio

12345 | ÷ | 45678 | = | .27026

(b) Calculation of the Baseline Total Annual Special Assessment for Domestic Utilities. The Annual Special Assessment ratio calculated in paragraph (a) of this section shall be multiplied by $480 million, yielding the total amount of the Baseline Total Annual Special Assessment as of October 1992. In the event that this amount is in excess of $150 million, the Baseline Total Annual Special Assessment shall be capped at $150 million. All calculations will be carried out to the fifth significant digit. The Baseline Total Annual Special Assessment is determined as shown in the following hypothetical example:

Total fund | Annual assessment ratio | Baseline total annual special assessment

$480,000,000 | × | 0.27026 | = | $129,724,800

(c) Calculation of Baseline Total Annual Special Assessment per Utility. The ratio of the total number of SWUs purchased by an individual domestic utility for commercial electricity generation, to the total number of SWUs purchased by all domestic utilities for commercial electricity generation, multiplied by the Baseline Total Annual Special Assessment calculated in paragraph (b) of this section, determines an individual utility's share of the Baseline Total Annual Special Assessment. All calculations will be carried out to the fifth significant digit. A hypothetical example of such a calculation follows:

Single utility SWUs | All utility SWUs | Utility ratio | Baseline total annual special assessment | Individual utility special Assessment

300 | ÷ | 12345 | = | .02430 | × | $129,724,800 | $3,152,312.64

(d) Calculation of Inflation Adjustment. The Baseline Total Annual Special Assessment billed to domestic utilities shall be adjusted for inflation using the most recently published monthly CPI-U and the CPI-U for October 1992. All calculations will be carried out to the fifth significant digit. A hypothetical example of such a calculation follows:

CPI-U (Mar 93) | CPI-U (Oct 92) | Adjustment multiplier

150 | ÷ | 141.8 | = | 1.05783

Utility special Assessment | Adjustment multiplier | Adjusted utility assessment

$3,152,312.64 | × | 1.05783 | = | $3,334,610.88

§ 766.103 Special Assessment invoices.

(a) DOE shall issue annually a Special Assessment invoice to each domestic utility. This invoice will specify itemized quantities of enrichment services by reactor. In each Special Assessment invoice, DOE shall require payment, on or before 30 days from the date of each invoice, of that utility's prorated share of the Baseline Total Annual Special Assessment, as adjusted for inflation using the most recently published monthly CPI-U data.

(b) DOE shall enclose with the Fiscal Year 1993 Special Assessment invoice a sealed, business confidential, summary SWU transaction statement including:

(1) TESS information which documents, by reactor, the basis of the utility's assessment;

(2) A list of domestic utilities subject to the Special Assessment;

(3) The total number of SWUs purchased from DOE by all domestic utilities for all purposes prior to October 24, 1992.

(4) The total number of SWUs purchased from DOE for all purposes prior to October 24, 1992, including SWUs purchased or produced for defense purposes; and

(5) Such other information as may be appropriate.

(c) With regard to any fiscal year after Fiscal Year 1993, DOE shall enclose a summary SWU transaction statement with Special Assessment invoices that will include updated information regarding adjustments to Special Assessments resulting from the reconciliation and appeals process under Section 766.104.

(d) The date of each Annual Special Assessment invoicing will be set on or about October 1 with payment due 30 calendar days from the date of invoice starting with the Fiscal Year 1995 Special Assessment.

§ 766.104 Reconciliation, adjustments and appeals.

(a) A domestic utility requesting an adjustment shall, within 30 days from the date of a Special Assessment invoice, file a notice requesting an adjustment. Such notice shall include an explanation of the basis for the adjustment and any supporting documents, and may include a request for a meeting with DOE to discuss its invoice. If more time is needed to gather probative information, DOE will consider utility requests for up to 90 days additional time, providing that the initial notice requesting an adjustment was timely filed. The notice shall be filed at the address set forth in the Special Assessment invoice, and filing of this notice is complete only upon receipt by DOE. Domestic utilities are considered to have met the filing requirements upon DOE's receipt of the notice requesting an adjustment without regard to DOE's acceptance of supporting documentation. The filing of a notice for an adjustment shall not stay the obligation to pay.

(b) DOE may request additional information from domestic utilities and may acquire data from other sources.

(c) After reviewing a notice submitted under paragraph (a) of this section and other relevant information, and after making any necessary adjustment to its records in light of reliable and adequately probative records submitted in connection with the request for adjustment or otherwise obtained by DOE, DOE shall make a written determination granting or denying the requested adjustment. As appropriate, DOE shall modify the application of TESS data for any discrepancies or further transactions raised during the reconciliation process.

(d) Any domestic utility that wishes to dispute a written determination under paragraph (c) of this section shall have the right to file an appeal with the Office of Hearings and Appeals, U.S. Department of Energy, 1000 Independence Avenue S.W., Washington, DC 20585. Except for the Fiscal Year 1993 Special Assessment, any appeal must be filed on or before 30 days from the date of the written determination and should contain information of the type described in 10 CFR part 1003, subpart C. With regard to a written determination under paragraph (c) of this section concerning a Fiscal Year 1993 Special Assessment, a domestic utility must file an appeal on or before 30 days from the effective date of this paragraph or from the date of such written determination, whichever is later. The decision of the Office of Hearings and Appeals shall be the final decision of DOE. Upon completion of the reconciliation process, all records of SWU transactions shall be finalized and shall become the basis of subsequent Special Assessment invoices. These records shall be revised to reflect any decisions from the Office of Hearings and Appeals and any applicable court rulings.

(e) Refunds of Special Assessments shall be provided in cases where DOE has determined, as a result of reconciliation, that an overpayment has been made by a domestic utility, and that the domestic utility has no further current obligation to DOE.

[59 FR 41963, Aug. 15, 1994, as amended at 60 FR 15017, Mar. 21, 1995]

§ 766.105 Payment procedures.

DOE shall specify payment details and instructions in all Special Assessment invoices. Each domestic utility shall make payments to the Fund by wire transfer to the Department of Treasury.

§ 766.106 Late payment fees.

In the case of a late payment by a domestic utility of its Special Assessment, the domestic utility shall pay interest at the per annum rate (365-day basis) established by DOE for general application to monies due DOE and not received by DOE on or before a designated due date. Interest shall accrue beginning the date of the designated payment except that, whenever the due date falls on a Saturday, Sunday, or a United States legal holiday, interest shall commence on the next day immediately following which is not a Saturday, Sunday, or United States legal holiday. Late payment provisions for the Special Assessment to the Fund shall be based on the Treasury Current Value of Funds Rate (which is published annually by the Treasury and used in assessing interest charges for outstanding debts on claims owed to the United States Government), plus six (6) percent pro rata on a daily basis. The additional six (6) percent charge shall not go into effect until five (5) business days after payment was originally due. Late payment fees shall be invoiced within two days of receipt of utility payment of the special assessment when delinquency is less than 30 days. For longer periods of delinquency, DOE will submit additional invoices, as appropriate. Late payment fees will be due 30 days from the date of invoice.

§ 766.107 Prepayment of future Special Assessments.

DOE shall accept prepayment of future Special Assessments upon request by a domestic utility. A domestic utility's liability for the future assessments shall be satisfied to the extent of the prepayments. DOE shall use the pro rata share of prepayments attributable to a given fiscal year plus the Special Assessments collected from utilities who did not prepay for that fiscal year, in order to determine that the total amount of Special Assessments collected from domestic utilities in a given fiscal year does not exceed $150 million, annually adjusted for inflation.

PART 770 TRANSFER OF REAL PROPERTY AT DEFENSE NUCLEAR FACILITIES FOR ECONOMIC DEVELOPMENT

Authority: 50 U.S.C. 2811.

Source: 65 FR 10689, Feb. 29, 2000, unless otherwise noted.

§ 770.1 What is the purpose of this part?

(a) This part establishes how DOE will transfer by sale or lease real property at closed or downsized defense nuclear facilities for economic development.

(b) This part also contains the procedures for a person or entity to request indemnification for any claim that results from the release or threatened release of a hazardous substance or pollutant or contaminant as a result of DOE activities at the defense nuclear facility.

[65 FR 10689, Feb. 29, 2000, as amended at 78 FR 67927, Nov. 13, 2013]

§ 770.2 What real property does this part cover?

(a) DOE may transfer DOE-owned real property by sale or lease at closed or downsized defense nuclear facilities, for the purpose of permitting economic development.

(b) DOE may transfer, by lease only, improvements at defense nuclear facilities on land withdrawn from the public domain, that are unneeded, temporarily underutilized, or underutilized, for the purpose of permitting economic development and for facilitating local reuse or redevelopment.

[65 FR 10689, Feb. 29, 2000, as amended at 78 FR 67927, Nov. 13, 2013]

§ 770.3 What general limitations apply to this part?

(a) Nothing in this part affects or modifies in any way section 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (42 U.S.C. 9620(h)).

(b) Individual proposals for transfers of property are subject to NEPA review as implemented by 10 CFR part 1021.

(c) Any indemnification agreed to by the DOE is subject to the availability of funds.

§ 770.4 What definitions are used in this part?

Community Reuse Organization or CRO means a governmental or non-governmental organization that is recognized by DOE and that represents a community adversely affected by DOE work force restructuring at a defense nuclear facility..

Claim means a request for reimbursement of monetary damages.

Defense Nuclear Facility means “Department of Energy defense nuclear facility” within the meaning of section 318 of the Atomic Energy Act of 1954 (42 U.S.C. 2286g).

DOE means the United States Department of Energy.

DOE Field Office means any of DOE's officially established organizations and components located outside the Washington, D.C., metropolitan area. (See Field Office Manager.)

Economic Development means the use of transferred DOE real property in a way that enhances the production, distribution, or consumption of goods and services in the surrounding region(s) or which furthers reuse or redevelopment, and furthers the public policy objectives of the laws governing the downsizing of DOE's defense nuclear facilities.

Field Office Manager means the head of the DOE Operations Offices or Field Offices associated with the management and control of defense nuclear facilities.

Hazardous Substance means a substance within the definition of “hazardous substances” in subchapter I of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601(14)).

Indemnification means the responsibility for reimbursement of payment for any suit, claim, demand or action, liability, judgment, cost, or other fee arising out of any claim for personal injury or property damage, including business losses consistent with generally accepted accounting practices, which involve the covered real property transfers. Indemnification payments are subject to the availability of appropriated funds.

Person or Entity means any state, any political subdivision of a state or any individual person that acquires ownership or control of real property at a defense nuclear facility.

Pollutant or Contaminant means a substance identified within the definition of “pollutant or contaminant” in section 101(33) of CERCLA (42 U.S.C. 9601(33)).

Real Property means all interest in land, together with the improvements, structures, and fixtures located on the land (usually including prefabricated or movable structures), and associated appurtenances under the control of any federal agency.

Release means a “release” as defined in subchapter I of CERCLA (42 U.S.C. 9601(22)).

Underutilized Real Property or Temporarily Underutilized Real Property means the entire property or a portion of the real property (with or without improvements) that is used only at irregular intervals, or which is used by current DOE missions that can be satisfied with only a portion of the real property. Underutilized property is available by lease only.

Unneeded Real Property means any property under DOE control that the Field Office, cognizant program, or the Secretary of Energy have determined, according to applicable procedures, to be no longer needed for the purposes of conducting DOE business.

[65 FR 10689, Feb. 29, 2000, as amended at 78 FR 67927, Nov. 13, 2013]

§ 770.5 How does DOE notify persons and entities that defense nuclear facility real property is available for transfer for economic development?

(a) Field Office Managers annually make available to Community Reuse Organizations, local government, and Tribal nations, and other persons and entities a list of real property at defense nuclear facilities that DOE has identified as appropriate for transfer for economic development. Field Office Managers may use any effective means of publicity to notify potentially-interested persons or entities of the availability of the list.

(b) Upon request, Field Office Managers provide to interested persons and entities relevant information about listed real property, including information about a property's physical condition, environmental, safety and health matters, and any restrictions or terms of transfer.

[65 FR 10689, Feb. 29, 2000, as amended at 78 FR 67927, Nov. 13, 2013]

§ 770.6 May interested persons and entities request that real property at defense nuclear facilities be transferred for economic development?

Any person or entity may request that specific real property be made available for transfer for economic development pursuant to procedures in § 770.7. A person or entity must submit such a request in writing to the Field Office Manager who is responsible for the real property.

§ 770.7 What procedures are to be used to transfer real property at defense nuclear facilities for economic development?

(a) Proposal. The transfer process starts when a potential purchaser or lessee submits to the Field Office Manager a proposal for the transfer of real property that DOE has included on a list of available real property, as provided in § 770.5 of this part.

(1) A proposal must include (but is not limited to):

(i) A description of the real property proposed to be transferred;

(ii) The intended use and duration of use of the real property, including potential users and an indication that these users are interested in participating in the economic development of the property;

(iii) A description of the economic development that would be furthered by the transfer (e.g., jobs to be created or retained, improvements to be made) or what reuse or reutilization would be accomplished by means of a description of the business to be created (direct and indirect economic benefits that will result due to the proposed transfer);

(iv) Information supporting the economic viability of the proposed development; and

(v) The consideration offered and any financial requirements.

(2) The person or entity should state in the proposal whether it is or is not requesting indemnification against claims based on the release or threatened release of a hazardous substance or pollutant or contaminant resulting from DOE activities.

(3) If a proposal for transfer does not contain a statement regarding indemnification, the Field Office Manager will notify the person or entity by letter of the potential availability of indemnification under this part, and will request that the person or entity either modify the proposal to include a request for indemnification or submit a statement that it is not seeking indemnification.

(b) Decision to transfer real property. After review of the proposal, DOE will notify, by letter, the person or entity that submitted the proposal of DOE's decision whether or not a transfer of the real property by sale or lease is in the best interest of the Government. If DOE determines the transfer is in the Government's best interest, then the Field Office Manger will begin development of a transfer agreement.

(c) Congressional committee notification. DOE may not transfer real property under this part until 30 days have elapsed after the date DOE notifies congressional defense committees of the proposed transfer. The Field Office Manager will notify congressional defense committees through the Secretary of Energy.

[65 FR 10689, Feb. 29, 2000, as amended at 78 FR 67927, Nov. 13, 2013]

§ 770.8 May DOE transfer real property at defense nuclear facilities for economic development at less than fair market value?

DOE generally attempts to obtain fair market value for real property transferred for economic development, but DOE may agree to sell or lease such property for less than fair market value if the statutory transfer authority used imposes no market value restriction, and:

(a) The real property requires considerable infrastructure improvements to make it economically viable, or

(b) A conveyance at less than market value would, in the DOE's judgment, further the public policy objectives of the laws governing the downsizing of defense nuclear facilities.

§ 770.9 What conditions apply to DOE indemnification of claims against a person or entity based on the release or threatened release of a hazardous substance or pollutant or contaminant attributable to DOE?

(a) If an agreement for the transfer of real property for economic development contains an indemnification provision, the person or entity requesting indemnification for a particular claim must:

(1) Notify the Field Office Manager in writing within two years after such claim accrues under § 770.11 of this part;

(2) Furnish the Field Office Manager, or such other DOE official as the Field Office Manager designates, with evidence or proof of the claim;

(3) Furnish the Field Office Manager, or such other DOE official as the Field Office Manager designates, with copies of pertinent papers (e.g., legal documents) received by the person or entity;

(4) If requested by DOE, provide access to records and personnel of the person or entity for purposes of defending or settling the claim; and

(5) Provide certification that the person or entity making the claim did not contribute to any such release or threatened release.

(b) DOE will enter into an indemnification agreement if DOE determines that indemnification is essential for the purpose of facilitating reuse or redevelopment.

(c) DOE may not indemnify any person or entity for a claim if the person or entity contributed to the release or threatened release of a hazardous substance or pollutant or contaminant that is the basis of the claim.

(d) DOE may not indemnify a person or entity for a claim made under an indemnification agreement if the person or entity refuses to allow DOE to settle or defend the claim.

(e) Any indemnification provided will apply to any successor, assignee, transferee, lender or lessee of the original entity that acquires ownership or control.

[65 FR 10689, Feb. 29, 2000, as amended at 78 FR 67927, Nov. 13, 2013]

§ 770.10 When must a person or entity, who wishes to contest a DOE denial of request for indemnification of a claim, begin legal action?

If DOE denies the claim, DOE must provide the person or entity with a notice of final denial of the claim by DOE by certified or registered mail. The person or entity must begin legal action within six months after the date of mailing.

§ 770.11 When does a claim “accrue” for purposes of notifying the Field Office Manager under § 770.9(a) of this part?

For purposes of § 770.9(a) of this part, a claim “accrues” on the date on which the person asserting the claim knew, or reasonably should have known, that the injury to person or property was caused or contributed to by the release or threatened release of a hazardous substance, pollutant, or contaminant as a result of DOE activities at the defense nuclear facility on which the real property is located.

PART 780 PATENT COMPENSATION BOARD REGULATIONS

Authority: 42 U.S.C. 7151, 7254; 42 U.S.C. 5814, 5815; 42 U.S.C. 2183, 2187, 2223; 35 U.S.C. 183; North American Free Trade Agreement, Article 1709(10), as implemented by the North American Free Trade Agreement Implementing Act, Pub. L. 103-182.

Source: 46 FR 39581, Aug. 4, 1981, unless otherwise noted.

Subpart A General Provisions

§ 780.1 Scope.

The regulations in this part establish the procedures, terms, and conditions for Patent Compensation Board:

(a) Proceedings to declare a patent affected with the public interest pursuant to section 153a of the Atomic Energy Act of 1954 (Pub. L. 83-703; 42 U.S.C. 2183);

(b) Proceedings to determine a reasonable royalty fee pursuant to section 157 of the Atomic Energy Act of 1954;

(c) Proceedings for the grant of an award pursuant to section 157 of the Atomic Energy Act of 1954;

(d) Proceedings to obtain compensation pursuant to section 173 of the Atomic Energy Act of 1954 and the Invention Secrecy Act (35 U.S.C. 183);

And for applications to the Department of Energy (DOE) for a patent license pursuant to sections 153b(2) and 153c of the Atomic Energy Act of 1954.

§ 780.2 Definitions.

(a) Act means the Atomic Energy Act of 1954 (Pub. L. 83-703; 42 U.S.C. 2011).

(b) Application means the application filed by an applicant for a patent license, for the determination of a reasonable royalty fee, for an award, or for compensation under this part.

(c) Board means the Patent Compensation Board.

(d) Chairman means the Chairman of the Patent Compensation Board.

(e) Department, or DOE, or Department of Energy means the Department of Energy, established by the Department of Energy Organization Act (Pub. L. 95-91; 42 U.S.C. 7101).

(f) Party means the applicant, patent owner, Department representative, and any person admitted as a party by the Board for any proceeding under this part.

(g) Patent Owner means the owner of record in the United States Patent and Trademark Office.

(h) Secretary means the Secretary of the Department of Energy or the delegate of the Secretary of Energy.

§ 780.3 Jurisdiction of the Patent Compensation Board.

The Patent Compensation Board was established by section 157 of the Atomic Energy Act of 1954. It was transferred to the Energy Research and Development Administration pursuant to section 104(d) of the Energy Reorganization Act of 1974 (42 U.S.C. 5814) and subsequently to the Department of Energy by section 301 of the Department of Energy Organization Act (42 U.S.C. 7151). Under section 157, the Board is given authority to determine reasonable royalty fees or resolve issues involving the grant of awards. In addition, the Board has authority:

(a) To hear and make decisions as to compensation under section 173 of the Act (42 U.S.C. 2223) and the Invention Secrecy Act (35 U.S.C. 183);

(b) To hear and make decisions as to whether a specific patent is affected with the public interest pursuant to section 153a of the Act;

(c) To hear and make decisions as to whether a specific patent license should be granted under sections 153b(2) and 153e of the Act;

(d) To give notices, hold hearings and take such other actions as may be necessary under section 153; and

(e) To exercise all powers available under the Act and necessary for the performance of these duties, including the issuance of such rules of procedure as may be necessary.

§ 780.4 Filing and service of documents.

(a) All communications regarding proceedings subject to this part should be addressed to: Chairman, Patent Compensation Board, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585. All documents offered for filing shall be accompanied by proof of service upon all parties to the proceeding or their attorneys of record as required by law, rule, or order of the Department. Service on the Department shall be by mail or delivery to: Office of Assistant General Counsel for Technology Transfer and Intellectual Property, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585.

(b) Filing by mail will be deemed to be complete as of the time of deposit in the United States mail.

[77 FR 4887, Feb. 1, 2012]

§ 780.5 Applications—General form, content, and filing.

(a) Each application shall be signed by the applicant and shall state the applicant's name and address. If the applicant is a corporation, the application shall be signed by an authorized officer of the corporation, and the application shall indicate the state of incorporation. Where the applicant elects to be represented by counsel, a signed notice to that effect shall be filed with the Board.

(b) Each application must contain a concise statement of all of the essential facts upon which it is based. No particular form of statement is required. Each application shall be verified by the applicant or by the person having the best knowledge of such facts. In the case of facts stated on information and belief, the source of such information and grounds of belief shall be given.

(c) Each application must identify any person whose interest the applicant believes may be affected by the proceeding before the Board.

(d) Three copies of each application shall be filed with the Board. However, only one copy of the accompanying exhibits need be filed.

(e) The Board will acknowledge the receipt of the application in writing and advise the applicant of the docket number assigned to the application.

§ 780.6 Department participation.

The Department shall be a party to all proceedings under this part, and the Office of the General Counsel will represent the Department's interests before the Board.

§ 780.7 Designation of interested persons as parties.

In any proceeding under this part, the Board shall admit as a party any person, upon application of such person or on the Board's own initiative, whose interest may be affected by the proceeding.

§ 780.8 Security.

In any proceeding under this part, the Board shall take such steps as necessary pursuant to chapter 12 of the Act and section 181 of the Act to assure compliance with Department security regulations and the common defense.

§ 780.9 Make-up of the Patent Compensation Board.

The DOE Secretary of Energy, or a person acting in that position, shall appoint a three member panel to serve as the Patent Compensation Board to hear and decide cases falling under the subject matter jurisdiction set forth in § 780.3 of this part. The Secretary of Energy shall further designate one member as the chairman. The Board may be appointed to hear cases on an ad hoc basis, or on other such term of service deemed appropriate by the Secretary. All proceedings shall be conducted pursuant to rules of procedure provided by the Board.

[77 FR 4887, Feb. 1, 2012]

§ 780.10 Decision of the Board.

The decision of the Board in any proceeding under this part shall constitute the final action of the Department on the matter.

§ 780.11 Records of the Board.

The records of the Board in cases filed before it, including the pleadings, the transcript, and the final decision, shall be open to public inspection, except to the extent that such records or portions thereof are withheld from disclosure by the Board pursuant to 10 CFR part 1004.

Subpart B Declaring Patents Affected With the Public Interest Under Section 153a of the Atomic Energy Act of 1954

§ 780.20 Initiation of proceeding.

When any person in the Department believes that the Department should declare a patent affected with the public interest pursuant to section 153a of the Act, that person shall make such a recommendation to the Under Secretary. If, after consultation with the General Counsel, the Under Secretary agrees with the recommendation, the Under Secretary shall initiate in writing a proceeding under section 153a before the Board. The communication of the Under Secretary to the Board shall identify the patent and state the basis for the proposed declaration.

§ 780.21 Notice.

The Board will serve upon the patent owner and all other parties a written notice of the Department's proposed action to declare the patent affected with the public interest, and the notice shall identify the patent and state the basis for the proposed declaration.

§ 780.22 Opposition, support and request for hearing.

(a) Any party may, within thirty (30) days after service of the notice or such other time as may be provided by the terms of the notice, file with the Board a written statement in opposition to or in support of the Department's proposed action. Such statement may also include a request for hearing. The statement shall contain a concise description of the facts, law, or any other relevant matter which the party believes should be reviewed by the Board during its consideration of the proposed declaration. If the request for a hearing is timely received, the Board shall call a hearing and provide notice of the time and place to all parties.

(b) Failure of all parties to oppose the proposed action or to request a hearing within the time specified in the notice shall be deemed an acquiescence to that action and may result in a declaration by the Board that the patent is affected with the public interest.

§ 780.23 Hearing and decision.

If a timely request for a hearing is made by any party, the Board will proceed with a hearing and decision. If a hearing is not requested, the Board shall prepare and issue its decision on the record.

§ 780.24 Criteria for declaring a patent affected with the public interest.

A patent shall be declared to be affected with the public interest pursuant to section 153a of the Act upon the Board's final decision that:

(a) The invention or discovery covered by the patent is of primary importance in the production or utilization of special nuclear material or atomic energy; and

(b) The licensing of such invention or discovery under section 153 of the Act is of primary importance to effectuate the policies and purposes of the Act.

Subpart C Application for a License Pursuant to Section 153b(2) of the Atomic Energy Act of 1954

§ 780.30 Filing of application.

An applicant for a license pursuant to section 153b(2) of the Act, under a patent which the Department has declared to be affected with the public interest, shall file an application with the Board in accordance with § 780.5. The Board will docket the application and serve notice of the docketing upon all parties.

§ 780.31 Contents of application.

Each application shall contain, in addition to the requirements specified in § 780.5, the following information:

(a) The activities in the production or utilization of special nuclear material or atomic energy to which applicant proposes to apply the patent license;

(b) The nature and purpose of the applicant's intended use of the patent license;

(c) The relationship of the invention or discovery to the authorized activities to which it is to be applied, including an estimate of the effect on such activities stemming from the grant or denial of the license;

(d) Efforts made by the applicant to obtain a patent license from the owner of the patent;

(e) Terms, if any, on which the owner of the patent proposes to grant the applicant a patent license;

(f) The terms the applicant proposes for the patent license; and

(g) A request for either a hearing or a decision on the record.

§ 780.32 Response and request for hearing.

Any party within thirty (30) days after service of the notice of docketing of the application:

(a) May file with the Board a response containing a concise statement of the facts or law or any other relevant information which that party believes should be considered by the Board in opposition to or in support of the proposed application; and

(b) May file a request for a hearing or for a decision on the record.

§ 780.33 Hearing and decision.

If any party requests a hearing, the Board will proceed with a hearing and decision. If a hearing is not requested, the Board shall on the basis of the record prepare and issue its decision.

§ 780.34 Criteria for decision to issue a license.

A license shall issue to the applicant to use the invention covered by the patent declared to be affected with the public interest pursuant to subsection 153b(2) of the Act upon a final decision that:

(a) The activities to which the patent license is proposed to be applied are of primary importance to the applicant's conduct of an activity authorized under the Act; and

(b) The applicant has made efforts to obtain reasonable commercial terms and conditions and such efforts have not been successful within a reasonable period of time. The requirement to make such efforts may be waived by the Board in the case of a national emergency or other circumstances of extreme urgency or in cases of public non-commercial use. Where this requirement is waived due to national emergency or other circumstances of extreme urgency, the owner of the patent shall be notified as soon as reasonably practicable. Where this requirement is waived for a public non-commercial use, the owner of the patent shall be notified promptly.

[46 FR 39581, Aug. 4, 1981, as amended at 58 FR 68734, Dec. 29, 1993]

§ 780.35 Communication of decision to General Counsel.

Following a determination to issue a patent license under section 153b(2) of the Act, the Board shall send the decision to the General Counsel and instruct the General Counsel to issue the license on terms deemed equitable by the Department and generally not less fair than those granted by the patentee or by the Department to similar licensees for comparable use.

§ 780.36 Conditions and issuance of license.

(a) Upon receipt of the Board's decision and instruction to issue a patent license, the General Counsel shall issue a license which complies with the following:

(1) The scope and durations of such use shall be limited to the purpose for which it was authorized;

(2) Such use shall be non-exclusive;

(3) Such use shall be non-assignable, except with that part of the enterprise or goodwill that enjoys such use;

(4) Any such use shall be authorized predominantly for the supply of the U.S. market; and,

(5) Authorization for such use shall be liable, subject to adequate protection of the legitimate interests of the persons so authorized, to be terminated if and when the circumstances that led to it cease to exist and are unlikely to recur.

(b) The Board shall have the authority to review, on motivated request, the continued existence of these circumstances. The parties will propose and agree on a reasonable royalty fee within a reasonable time as determined by the General Counsel. A reasonable royalty shall provide adequate remuneration for the circumstances of each case, taking into account the economic value of the authorization. If a party does not agree with the terms and conditions of the license as determined by the General Counsel or if a royalty fee cannot be agreed upon within the reasonable time period established by the General Counsel, any party may, within 30 days after the expiration of such time period, initiate a proceeding before the Board, in accordance with subpart E of this part, for a reconsideration of the General Counsel's determination. After the proceeding under subpart E of this part is completed, the General Counsel shall modify the patent license in accordance with the Board's determination.

[58 FR 68734, Dec. 29, 1993]

Subpart D Application for a License Pursuant to Section 153c of the Atomic Energy Act of 1954

§ 780.40 Filing of application.

An application to the Department, pursuant to section 153c of the Act, for the issuance of a license to use the invention or discovery covered by a patent useful in the production or utilization of special nuclear material or atomic energy shall be filed with the Board in accordance with requirements of § 780.5.

§ 780.41 Contents of application.

In addition to the information specified in § 780.5, each application shall contain the following:

(a) The applicant's contention, with supporting data, that the invention or discovery covered by the patent is of primary importance in the production or utilization of special nuclear material or atomic energy;

(b) The applicant's contention, with supporting data, that the licensing of such invention or discovery is of primary importance to the conduct of the activities of the applicant, including information concerning:

(1) The activities in the production or utilization of special nuclear material or atomic energy to which applicant proposes to apply the license;

(2) The nature and purpose of the applicant's intended use of the patent license; and

(3) The relationship of the invention or discovery to the activities to which it is to be applied, including an estimate of the effect of such activities stemming from the grant or denial of the license.

(c) The applicant's contention, with supporting data, that the activities to which the patent license are proposed to be applied are of primary importance to the furtherance of policies and purposes of the Act;

(d) The applicant's contention, with supporting data, that such applicant cannot otherwise obtain a patent license from the owner of the patent on terms which are reasonable for the applicant's intended use of the patent, including information concerning:

(1) Efforts made by applicant to obtain a patent license from the owner of the patent; and

(2) Terms, if any, on which the owner of the patent proposed to grant applicant a patent license.

(e) The terms the applicant proposes as reasonable for the patent license; and

(f) A copy of any license, permit, or lease obtained by the applicant under the procedures outlined in section 153(c) of the Act.

§ 780.42 Notice of hearing.

Within thirty (30) days after the filing of the application, the Board will serve on all parties a notice of hearing to be held not later than sixty (60) days after the filing of the application.

§ 780.43 Response.

Any party may file a response with the Board containing a concise statement of the facts or law or any other relevant information in opposition to or in support of the application which that party believes should be considered by the Board. Such response must be filed by a party within twenty (20) days after being served a copy of the application.

§ 780.44 Hearing and decision.

In accordance with section 153d of the Act, the Board shall hold a hearing and issue a final decision on the application.

§ 780.45 Criteria for decision to issue a license.

A license shall issue to the applicant to use the invention covered by the patent for the purposes stated in the application upon a final decision that:

(a) The invention or discovery covered by the patent is of primary importance in the production or utilization of special nuclear material or atomic energy;

(b) The licensing of such invention or discovery is of primary importance to the conduct of the activities of the applicant;

(c) The activities to which the patent license is proposed to be applied by such applicant are of primary importance to the furtherance of policies and purposes of the Act; and

(d) The applicant has made efforts to obtain reasonable commercial terms and conditions and such efforts have not been successful within a reasonable period of time. The requirement to make such efforts may be waived by the Board in the case of a national emergency or other circumstances of extreme urgency or in cases of public non-commercial use. Where this requirement is waived due to national emergency or other circumstances of extreme urgency, the owner of the patent shall be notified as soon as reasonably practicable. Where this requirement is waived for a public non-commercial use, the owner of the patent shall be notified promptly.

[46 FR 39581, Aug. 4, 1981, as amended at 58 FR 68734, Dec. 29, 1993]

§ 780.46 Communication of decision to General Counsel.

When the Board decides to issue a patent license under section 153c of the Act, the Board shall send the decision to the General Counsel and instruct the General Counsel to issue the license on terms deemed equitable by the Department and generally not less fair than those granted by the patentee or by the Department to similar licensees for comparable use.

§ 780.47 Conditions and issuance of license.

(a) Upon receipt of the Board's decision and instruction to issue a patent license, the General Counsel shall issue a license which complies with the following:

(1) The scope and durations of such use shall be limited to the purpose for which it was authorized;

(2) Such use shall be non-exclusive;

(3) Such use shall be non-assignable, except with that part of the enterprise or goodwill that enjoys such use;

(4) Any such use shall be authorized predominantly for the supply of the U.S. market; and,

(5) Authorization for such use shall be liable, subject to adequate protection of the legitimate interests of the persons so authorized, to be terminated if and when the circumstances that led to it cease to exist and are unlikely to recur.

(b) The Board shall have the authority to review, on motivated request, the continued existence of these circumstances. The parties will propose and agree on a reasonable royalty fee within a reasonable time as determined by the General Counsel. A reasonable royalty shall provide adequate remuneration for the circumstances of each case, taking into account the economic value of the authorization. If a party does not agree with the terms and conditions of the license as determined by the General Counsel or if a royalty fee cannot be agreed upon within the reasonable time period established by the General Counsel, any party may, within 30 days after the expiration of such time period, initiate a proceeding before the Board, in accordance with subpart E of this part, for a reconsideration of the General Counsel's determination. After the proceeding under subpart E of this part is completed, the General Counsel shall modify the patent license in accordance with the Board's determination.

[46 FR 39581, Aug. 4, 1981, as amended at 58 FR 68734, Dec. 29, 1993]

Subpart E Application for Royalties and Awards Under Section 157 of the Atomic Energy Act of 1954 and Compensation Under Section 173 of the Atomic Energy Act of 1954 and the Invention Secrecy Act (35 U.S.C. 183)

§ 780.50 Applicants.

(a) Any owner or licensee of a patent licensed under section 158 or subsections b or e of section 153 of the Act may file an application with the Board for the determination of a reasonable royalty fee.

(b) Any owner or licensee of a patent licensed under subsections b or e of section 153 of the Act may file an application with the Board for the modification of any terms and conditions of the license.

(c) Any person who has made an invention or discovery useful in the production or utilization of special nuclear material or atomic energy, has complied with the provisions of section 151c, but, under the Act, is not entitled to a royalty for such invention or discovery, may file an application for an award.

(d) Any owner of a patent application that contains restricted data not belonging to the United States which the Department has communicated to any foreign nation may make application for just compensation pursuant to section 173 of the Act.

(e) Any patent applicant, whose patent is withheld because of a secrecy order issued at the request of the Department may, beginning at the date the patent applicant is notified that, except for such order, the application is otherwise in condition for allowance, apply for compensation for the damage caused by the secrecy order and/or for the use of the invention by the Government, resulting from any disclosure to the Department required by the Invention Secrecy Act.

§ 780.51 Form and content.

(a) Each application shall contain a statement of the applicant's interest in the patent, patent application, invention or discovery and identify any other claimants of whom the applicant has knowledge.

(b) Each application must contain a concise statement of all of the essential facts upon which it is based. No particular form of statement is required, but it will facilitate consideration of the application if the following specific data accompany the application:

(1) In the case of an issued patent, a copy of the patent.

(2) In the case of a patent application, a copy of the application and of all Patent and Trademark Office actions and responses thereto.

(3) In the case of an invention or discovery as to which a report has been filed with the Department pursuant to subsection c of section 151 of the Act, a copy of such report.

(4) In the case of an award, the date relied upon as the date of invention.

(5) In all cases, a statement of the extent to which the invention or discovery was developed through federally financed research or with other Federal support.

(6) In all cases, the degree of the utility, novelty, and importance of the invention or discovery.

(7) In all cases, a statement of the actual use by the Federal Government or others of such invention or discovery, to the extent known to the applicant.

(8) In all cases, the cost of developing the invention or discovery and acquiring the patent or patent application.

(9) The royalty fee proposed, the proposed terms and conditions of a license agreement, or the amount sought as compensation or award, as well as the basis used in calculating such fee, compensation or award and whether a lump sum or periodic payments are sought.

(10) In an application for just compensation pursuant to section 173 of the Act, the ownership of the invention that is the subject matter of the patent application at the time the Department communicated the restricted data shall be set forth, and any restricted data contained in the application shall be specifically identified.

(11) In an application for compensation under the authority provided in the Invention Secrecy Act (35 U.S.C. 183), for the damage caused by imposition of a secrecy order on a patent application and/or for the use of the invention by the Government, the date of the secrecy order, the date of the notice that the patent application is in condition for allowance, and, if known to the applicant, the date of the first use of the invention by the Government.

§ 780.52 Notice and hearing.

The Board shall, in its discretion, afford the applicable party an opportunity for a hearing for the presentation of relevant evidence. Thirty (30) days notice shall be given of the time and place of such hearing. After expiration of the notice period, the Board shall proceed with a hearing and render its decision.

§ 780.53 Criteria for decisions for royalties, awards and compensation.

(a) In deciding a reasonable royalty fee for a patent licensed under section 158 or sections 153b or 153e of the Act, the Board shall consider:

(1) The economic value of the compulsory license and the Board shall strive to provide adequate remuneration for the circumstances of each case.

(2) Any defense, general or special, that a defendant could plead in an action for infringement;

(3) The extent to which such patent was developed through federally financed research or with other Federal support;

(4) The degree of utility, novelty, and importance of the invention or discovery; and

(5) The cost to the owner of the patent of developing such invention or discovery or of acquiring such patent.

(b) In deciding whether or not to grant an award, under section 157 of the Act, for the making of an invention or discovery useful in the production or utilization of special nuclear material or atomic energy, the Board shall take into account the considerations set forth in § 780.53(a) of this part and the actual use of such invention or discovery.

(c) In deciding whether or not to provide compensation, pursuant to section 173 of the Act, to a person who owns a patent application that contains restricted data not belonging to the United States which the Department has communicated to a foreign nation, the Board shall take into account the considerations set forth in § 780.53(b) of this part and the damage to the applicant resulting from such communication.

(d) In the course of its review of an application to provide compensation, pursuant to 35 U.S.C. 183, to an applicant whose patent was withheld because of a secrecy order issued at the request of the Department, the Board shall take into account the considerations set forth in § 780.53(b) of this part and:

(1) The damage sustained by the applicant as a result of the secrecy order; and

(2) The use of the invention by the Government resulting from the disclosure of such invention to the Department.

[46 FR 39581, Aug. 4, 1981, as amended at 58 FR 68735, Dec. 29, 1993]

PART 781 DOE PATENT LICENSING REGULATIONS

Authority: 42 U.S.C. 2186, 42 U.S.C. 2201(g), and 35 U.S.C. 207-209.

Source: 45 FR 73447, Nov. 4, 1980, unless otherwise noted.

12 General Provisions

§ 781.1 Scope.

The regulations of this part supplement the U.S. Department of Commerce regulations, entitled LICENSING OF GOVERNMENT OWNED INVENTIONS, at 37 CFR Part 404.

[77 FR 4889, Feb. 1, 2012]

§ 781.2 Policy.

(a) It is the policy of this regulation to use the patent system to promote the utilization of inventions arising from Department of Energy supported research and development.

(b) Decisions as to grants or denials of any license application will, in the discretion of the Secretary of Energy, be based on the Department of Energy's view of what is in the best interests of the United States and the general public under the provisions of these regulations. Decisions of the Department of Energy under these regulations may be made on the Secretary of Energy's behalf by the Assistant General Counsel for Technology Transfer and Intellectual Property, except where otherwise delegated.

[77 FR 4889, Feb. 1, 2012]

§ 781.3 [Reserved]
§ 781.4 Communications.

All communications concerning the regulations in this part, including applications for licenses, should be addressed or delivered to the General Counsel, Attention: Assistant General Counsel for Technology Transfer and Intellectual Property, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585.

[77 FR 4889, Feb. 1, 2012]

13 Types of Licenses and Conditions for Licensing

§§ 781.51-781.52 [Reserved]
§ 781.53 Additional licenses.

Subject to any outstanding licenses, nothing in this part shall preclude the Department of Energy from granting additional nonexclusive, or exclusive, or partially exclusive licenses for inventions covered by this part when the Department of Energy determines that to do so would provide for an equitable exchange of patent rights. The following circumstances are examples in which such licenses may be granted:

(a) In consideration of the settlement of interferences or other administrative proceedings before the U.S. Patent and Trademark Office;

(b) In consideration of a release of any claims;

(c) In exchange for or as a part of the consideration for a license under adversely held patents;

(d) As necessary for meeting obligations of the U.S. under any treaty, international agreement arrangement or cooperation, memorandum of understanding or similar arrangement; or

(e) In consideration for the settlement or resolution of any proceeding under the Department of Energy Organization Act or other law.

[77 FR 4889, Feb. 1, 2012]

14 Procedures

§§ 781.61-781.64 [Reserved]
§ 781.65 Appeals.

(a) Standing. The following parties have the right to appeal under this part:

(1) Pursuant to 37 CFR 404.11:

(i) A person whose application for a license has been denied;

(ii) A licensee whose license has been modified or terminated, in whole or in part;

(iii) A person who timely filed a written objection in response to the notice required by 37 CFR 404.7(a)(1)(i) or (b)(1)(i) and who can demonstrate to the satisfaction of the Federal agency that such person may be damaged by the agency action; or

(2) A management and operating contractor appealing an agency decision to grant a copyright license to a third party pursuant to the Rights in Data-Technology Transfer clause for DOE management and operating contracts per 48 CFR part 970.

(b) Notice of Appeal. Appeal under paragraph (a) of this section shall be initiated by filing a Notice of Appeal with the Secretary, ATTN: Deputy General Counsel for Technology Transfer and Procurement (“Deputy General Counsel”), within thirty (30) days from the date of receipt of a written notice by the Department of Energy of an action set forth in paragraph (a) of this section. The Notice of Appeal shall specify the portion of the decision from which the appeal is taken. A statement of fact and argument in the form of a brief in support of the appeal shall be submitted with the Notice of Appeal or within thirty (30) days thereafter.

(c) Procedure. Appeals under this section shall be conducted pursuant to rules of procedure provided by the Deputy General Counsel.

(d) Within sixty (60) days of receiving appellant's brief pursuant to paragraph (b) of this section or such other time period set by the Deputy General Counsel, the Office of the Assistant General Counsel for Technology Transfer and Intellectual Property shall submit to the Deputy General Counsel a response brief and shall timely serve a copy of the response brief to appellant.

(e) The Deputy General Counsel shall consider the facts and arguments submitted in appellant's brief submitted under paragraph (b) of this section, as well as those presented by the Assistant General Counsel for Technology Transfer and Intellectual Property. An appeal by a licensee under paragraph (a)(1)(ii) of this section may include a hearing, upon request of the licensee, to address a dispute over any relevant fact. Such request for a hearing must be received by the Deputy General Counsel within thirty (30) days of appellant's receipt of the response brief.

(f) The Deputy General Counsel shall issue a written decision, which shall constitute the final action of the Department on the matter.

(g) The parties may agree to Alternate Dispute Resolution in lieu of an appeal.

(h) Appeals Arising Under National Nuclear Security Administration (NNSA) Management and Operating Contracts. For appeals pursuant to paragraph (a)(2) of this section arising under management and operating contracts administered by NNSA for NNSA facilities, the NNSA Deputy General Counsel for Procurement shall be designated as the appeal authority (Deputy General Counsel) pursuant to paragraphs (b) through (f) of this section.

[77 FR 4890, Feb. 1, 2012]

§ 781.66 [Reserved]

15 Special Provisions

§ 781.71 [Reserved]
§ 781.81 [Reserved]

PART 782 CLAIMS FOR PATENT AND COPYRIGHT INFRINGEMENT

Authority: Dept. of Energy Organization Act; sec. 651, 91 Stat. 601, 42 U.S.C. 7261; Atomic Energy Act of 1954; sec. 107(d), 88 Stat. 1241, 42 U.S.C. 5817(d); sec. 161(g), 80 Stat. 443, 42 U.S.C. 2201(g); sec. 172, 62 Stat. 933, 42 U.S.C. 2223; Foreign Assistance Act of 1961, sec. 2356, 75 Stat. 440, 22 U.S.C. 2356; Patents, Invention Secrecy Act; sec. 183, 66 Stat. 4, 35 U.S.C. 183; Judiciary and Judical Procedure Act, sec. 1498, 62 Stat. 601, 28 U.S.C. 1498.

Source: 45 FR 26950, Apr. 22, 1980, unless otherwise noted.

Subpart A General

§ 782.1 Purpose.

The purpose of this regulation is to set forth policies and procedures for the filing and disposition of claims asserted against the Department of Energy of infringement of privately owned rights in patented inventions or copyrighted works.

§ 782.2 Objectives.

Whenever a claim of infringement of privately owned rights in patented inventions or copyrighted works is asserted against the Department of Energy, all necessary steps shall be taken to investigate and to settle administratively, to deny, or otherwise to dispose of such claim prior to suit against the United States.

§ 782.3 Authority.

The General Counsel or the General Counsel's delegate is authorized to investigate, settle, deny, or otherwise dispose of all claims of patent and copyright infringement pursuant to 42 U.S.C. 2201(g), 2223, 5817(d) and 7261; the Foreign Assistance Act of 1961, 22 U.S.C. 2356 (formerly the Mutual Security Acts of 1951 and 1954); the Invention Secrecy Act, 35 U.S.C. 183; and 28 U.S.C. 1498.

Subpart B Requirements and Procedures

§ 782.5 Contents of communication initiating claim.

(a) Requirements for claim. A patent or copyright infringement claim for compensation, asserted against the United States as represented by the Department of Energy under any of the applicable statutes cited in § 782.3, must be actually communicated to and received by an agency, organization, office, or field establishment within the Department of Energy. Claims must be in writing and must include the following:

(1) An allegation of infringement;

(2) A request, either expressed or implied, for compensation;

(3) A citation of the patents or copyrighted items alleged to be infringed;

(4) In the case of a patent infringement claim, a sufficiently specific designation to permit identification of the items or processes alleged to infringe the patents, giving the commercial designation if known to the claimant, or, in the case of a copyright infringement claim, the acts alleged to infringe the copyright;

(5) In the case of a patent infringement claim, a designation of at least one claim of each patent alleged to be infringed or, in the case of a copyright infringement claim, a copy of each work alleged to be infringed;

(6) As an alternative to paragraphs (a) (4) and (5) of this section, certification that the claimant has made a bona fide attempt to determine the items or processes which are alleged to infringe the patents, or the acts alleged to infringe the copyrights, but was unable to do so, giving reasons, and stating a reasonable basis for the claimant's belief that the patents or copyrighted items are being infringed.

(b) Additional information for patent infringement claims. In addition to the information listed in paragraph (a) of this section the following material and information generally is necessary in the course of processing a claim of patent infringement. Claimants are encouraged to furnish this information at the time of filing a claim to permit rapid processing and resolution of the claim.

(1) A copy of the asserted patents and identification of all claims of the patents alleged to be infringed.

(2) Identification of all procurements known to claimant that involve the accused items or processes, including the identity of the vendors or contractors and the Government acquisition activity or activities.

(3) A detailed identification and description of the accused articles or processes, particularly where the articles or processes relate to components or subcomponents of the item acquired, and an element-by-element comparison of representative claims with the accused articles or processes. If available, the identification and description should include documentation and drawings to illustrate the accused articles or processes in sufficient detail to enable verification that the claims of the asserted patents read on the accused articles or processes.

(4) Names and addresses of all past and present licensees under the patents and copies of all license agreements and releases involving the patents.

(5) A brief description of all litigation in which the patents have been or are now involved, and their present status.

(6) A list of all persons to whom notices of infringement have been sent, including all departments and agencies of the Government, and a statement of the status or ultimate disposition of each.

(7) A description of Government employment or military service, if any, by the inventors or patent owner.

(8) A list of all contracts between the Government and inventors, patent owner, or anyone in privity with them that were in effect at the time of conception or actual reduction to practice of the inventions covered by the patents.

(9) Evidence of title to the asserted patents or other right to make the claim.

(10) If it is available to claimant, a copy of the Patent Office file of each patent.

(11) Pertinent prior art of which the claimant has become aware after issuance of the asserted patents.

In addition to the foregoing, if claimant can provide a statement that the investigation may be limited to the specifically identified accused articles or processes, or to a specific acquisition (e.g. identified contracts), it may speed disposition of the claim.

(c) Denial for refusal to provide information. In the course of investigating a claim, it may become necessary for the Department of Energy to request information in the control and custody of claimant that is relevant to the disposition of the claim. Failure of the claimant to respond to a request for such information may be sufficient reason alone for denying a claim.

§ 782.6 Processing of administrative claims.

(a) Filing and forwarding of claims. All communications regarding claims should be addressed to:

General Counsel, ATTN: Assistant General Counsel for Patents, Office of the General Counsel, U.S. Department of Energy, Washington, DC 20545.

If any communication relating to a claim or possible claim of patent or copyright infringement is received by an agency, organization, office, or field establishment within the Department of Energy, it should be forwarded to the Assistant General Counsel for Patents.

(b) Disposition and notification. The General Counsel shall investigate and administratively settle, deny, or otherwise dispose of each claim by denial or settlement. When a claim is denied, the Department shall so notify the claimant or his authorized representative and provide the claimant with the reasons for denying the claim. Disclosure of information shall be subject to applicable statutes, regulations, and directives pertaining to security, access to official records, and the rights of others.

§ 782.7 Incomplete notice of infringement.

(a) If a communication alleging patent or copyright infringement is received that does not meet the requirements set forth above in § 782.5, the sender shall be advised in writing by the General Counsel:

(1) That the claim for infringement has not been satisfactorily presented; and

(2) Of the elements considered necessary to establish a claim.

(b) A communication, such as a mere offer of a license, in which an infringement is not alleged in accordance with § 782.5(a) of this part shall not be considered a claim for infringement.

§ 782.8 Indirect notice of infringement.

If a patent or copyright owner communicates an allegation of infringement in the performance of a Government contract, grant, or other arrangement to addressees other than those specified in § 782.5(a), such as Department of Energy contractors including contractors operating government-owned facilities, the communication shall not be considered a claim within the meaning of § 782.5 until it meets the requirements of that section.

PART 783 WAIVER OF PATENT RIGHTS

Authority: Secs. 152, 161, 68 Stat. 944, 948, as amended; (42 U.S.C. 2182, 2201).

Source: 41 FR 56784, Dec. 30, 1976, unless otherwise noted.

§ 783.1 Waiver.

The Department of Energy, hereinafter “DOE”, waives its rights under section 152 of the Atomic Energy Act of 1954 (66 Stat. 944) with respect to inventions and discoveries resulting from the use of the following materials and services:

(a) Source materials, special nuclear materials, and heavy water distributed by DOE in accordance with the “Schedules of Base Charges for Materials Sold of Leased by DOE for Use in Private Atomic Energy Development and Base Prices Which DOE Will Pay for Certain Products From Private Reactors.”

(b) Radioactive and stable isotopes, irradiation services (this waiver does not include inventions or discoveries made by DOE or DOE contractor personnel in the course of or in connection with the performance of an irradiation service), and radioactive material resulting from the performance of an irradiation service sold or distributed by DOE in accordance with the prices and charges established by:

(1) Oak Ridge National Laboratory Inventory and Price List of electromagnetically enriched and other stable isotopes.

(2) Oak Ridge National Laboratory Catalog and Price List of radioisotopes, special materials, and services.

(3) Idaho National Engineering Laboratory Catalog of Price and charges on irradiation services at the materials testing reactor. The waiver does include inventions or discoveries made by sponsor personnel in the course of their use of the Gamma Irradiation Facility at the Idaho National Engineering Laboratory.

(4) Argonne National Laboratory schedule of charges for irradiation services at its irradiation facilities.

(5) Brookhaven National Laboratory schedule of prices and charges for irradiation services and radioisotopes.

§ 783.2 Limitations.

(a) Except with regard to the use of the Gamma facility at the Idaho National Engineering Laboratory, nothing contained in this part shall be deemed to waive any rights in inventions or discoveries where a person or a group of persons acting on behalf of the person requesting the irradiation service works at the DOE facility in connection with the irradiation service. In such event, special arrangements are made.

(b) Nothing contained in this part shall be construed to affect the provisions of any written agreement to which DOE has or may become a party.

PART 784 PATENT WAIVER REGULATION

Authority: 42 U.S.C. 7151; 42 U.S.C. 5908; 42 U.S.C. 2182; 35 U.S.C. 202 and 210; 42 U.S.C. 7261a.

Source: 61 FR 36614, July 12, 1996, unless otherwise noted.

§ 784.1 Scope and applicability.

(a) This part states the policy and establishes the procedures, terms and conditions governing waiver of the Government's rights in inventions made under contracts, grants, agreements, understandings or other arrangements with the Department of Energy (DOE).

(b) This part applies to all inventions conceived or first actually reduced to practice in the course of or under any contract, grant, agreement, understanding, or other arrangement with or for the benefit of DOE (including any subcontract, subgrant, or subagreement), the patent rights disposition of which is governed by section 152 of the Atomic Energy Act of 1954, 42 U.S.C. 2182, or section 9 of the Federal Nonnuclear Energy Research and Development Act of 1974, 42 U.S.C. 5908. In funding agreements with nonprofit organizations or small business firms, when title or other rights are reserved to the Government under the authority of 35 U.S.C. 202(a), this part will apply to any waiver of such rights. The patent waiver provisions in this part supersede the patent waiver regulations previously included with patent regulations at 41 CFR part 9-9.100.

§ 784.2 Definitions.

As used in this part:

Contract means procurement contracts, grants, agreements, understandings and other arrangements (including Cooperative Research and Development Agreements [CRADAs], Work for Others and User Facility agreements, which includes research, development, or demonstration work, and includes any assignment or substitution of the parties, entered into, with, or for the benefit of DOE.

Contractor means entities performing under contracts as defined above.

Patent Counsel means the DOE Patent Counsel assisting the contracting activity.

§ 784.3 Policy.

(a) Section 6 of Public Law 96-517 (the Bayh-Dole patent and trademark amendments of 1980), as amended, as codified at 35 U.S.C. 200—212, provides that title to inventions conceived or first actually reduced to practice in the course of or under any contract, grant, agreement, understanding, or other arrangement entered into with or for the benefit of the Department of Energy (DOE) vests in the United States, except where 35 U.S.C. 202 provides otherwise for nonprofit organizations or small business firms. However, where title to such inventions vests in the United States, the Secretary of Energy (hereinafter Secretary) or designee may waive all or any part of the rights of the United States, subject to required terms and conditions, with respect to any invention or class of inventions made or which may be made by any person or class of persons in the course of or under any contract of DOE if it is determined that the interests of the United States and the general public will best be served by such waiver. In making such determinations, the Secretary or designee shall have the following objectives:

(1) Making the benefits of the energy research, development, and demonstration program widely available to the public in the shortest practicable time;

(2) Promoting the commercial utilization of such inventions;

(3) Encouraging participation by private persons in DOE's energy research, development, and demonstration programs; and

(4) Fostering competition and preventing undue market concentration or the creation or maintenance of other situations inconsistent with the antitrust laws.

(b) If it is not possible to attain the objectives in paragraphs (a)(1) through (4) immediately and simultaneously for any specific waiver determination, the Secretary or designee will seek to reconcile these objectives in light of the overall purposes of the DOE patent waiver policy, as set forth in section 152 of the Atomic Energy Act of 1954, 42 U.S.C. 2182, section 9 of the Federal Nonnuclear Energy Research and Development Act of 1974, 42 U.S.C. 5908, Public Law 99-661, 42 U.S.C. 7261a, and, where not inconsistent therewith, the Presidential Memorandum to the Heads of Executive Departments and Agencies on Government Patent Policy issued February 18, 1983 and Executive Order No. 12591 issued April 10, 1987.

(c) The policy set forth in this section is applicable to all types of contracts as defined in § 784.2 of this part.

§ 784.4 Advance waiver.

This section covers inventions that may be conceived or first actually reduced to practice in the course of or under a particular contract. In determining whether an advance waiver will best serve the interests of the United States and the general public, the Secretary or designee (currently the Assistant General Counsel for Technology Transfer and Intellectual Property) shall, at a minimum, specifically include as considerations the following:

(a) The extent to which the participation of the contractor will expedite the attainment of the purposes of the program;

(b) The extent to which a waiver of all or any part of such rights in any or all fields of technology is needed to secure the participation of the particular contractor;

(c) The extent to which the work to be performed under the contract is useful in the production or utilization of special nuclear material or atomic energy;

(d) The extent to which the contractor's commercial position may expedite utilization of the research, development, and demonstration results;

(e) The extent to which the Government has contributed to the field of technology to be funded under the contract;

(f) The purpose and nature of the contract, including the intended use of the results developed thereunder;

(g) The extent to which the contractor has made or will make substantial investment of financial resources or technology developed at the contractor's private expense which will directly benefit the work to be performed under the contract;

(h) The extent to which the field of technology to be funded under the contract has been developed at the contractor's private expense;

(i) The extent to which the Government intends to further develop to the point of commercial utilization the results of the contract effort;

(j) The extent to which the contract objectives are concerned with the public health, public safety, or public welfare;

(k) The likely effect of the waiver on competition and market concentration;

(l) In the case of a domestic nonprofit educational institution under an agreement not governed by Chapter 18 of Title 35, United States Code, the extent to which such institution has a technology transfer capability and program approved by the Secretary or designee as being consistent with the applicable policies of this section;

(m) The small business status of the contractor under an agreement not governed by Chapter 18 of Title 35, United States Code, and

(n) Such other considerations, such as benefit to the U.S. economy, that the Secretary or designee may deem appropriate.

§ 784.5 Waiver of identified inventions.

This section covers the relinquishing by the Government to the contractor or inventor of title rights in a particular identified subject invention. In determining whether such a waiver of an identified invention will best serve the interests of the United States and the general public, the Secretary or designee shall, at a minimum, specifically include as considerations the following:

(a) The extent to which such waiver is a reasonable and necessary incentive to call forth private risk capital for the development and commercialization of the invention;

(b) The extent to which the plans, intentions, and ability of the contractor or inventor will obtain expeditious commercialization of such invention;

(c) The extent to which the invention is useful in the production or utilization of special nuclear material or atomic energy;

(d) The extent to which the Government has contributed to the field of technology of the invention;

(e) The purpose and nature of the invention, including the anticipated use thereof;

(f) The extent to which the contractor has made or will make substantial investment of financial resources or technology developed at the contractor's private expense which will directly benefit the commercialization of the invention;

(g) The extent to which the field of technology of the invention has been developed at the contractor's expense;

(h) The extent to which the Government intends to further develop the invention to the point of commercial utilization;

(i) The extent to which the invention is concerned with the public health, public safety, or public welfare;

(j) The likely effect of the waiver on competition and market concentration;

(k) In the case of a domestic nonprofit educational institution under an agreement not governed by Chapter 18, Title 35, United States Code, the extent to which such institution has a technology transfer capability and program approved by the Secretary or designee as being consistent with the applicable policies of this section;

(l) The small business status of the contractor, under an agreement not governed by Chapter 18 of Title 35, United States Code; and,

(m) Such other considerations, such as benefit to the U.S. economy that the Secretary or designee may deem appropriate.

§ 784.6 National security considerations for waiver of certain sensitive inventions.

(a) Whenever, in the course of or under any Government contract or subcontract of the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy defense activities of the Department of Energy, a contractor makes an invention or discovery to which title vests in the Department of Energy pursuant to statute, the contractor may request waiver of any or all of the Government's property rights. The Secretary of Energy or designee may decide to waive the Government's rights.

(b) In making a decision under this section, the Secretary or designee shall consider, in addition to the objectives of DOE waiver policy as specified in § 784.3(a)(1) through (4), and the considerations specified in § 784.4 for advance waivers, and § 784.5 for waiver of identified inventions, the following:

(1) Whether national security will be compromised;

(2) Whether sensitive technical information (whether classified or unclassified) under the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy defense activities of the Department of Energy for which dissemination is controlled under Federal statutes and regulations will be released to unauthorized persons;

(3) Whether an organizational conflict of interest contemplated by Federal statutes and regulations will result, and

(4) Whether waiving such rights will adversely affect the operation of the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy defense activities of the Department of Energy.

(c) A decision under this § 784.6 shall be made within 150 days after the date on which a complete request for waiver, as described by paragraph (d) of this section, has been submitted to the Patent Counsel by the contractor.

(d) In addition to the requirements for content which apply generally to all waiver requests under paragraph (a) of this section, a requestor must include a full and detailed statement of facts, to the extent known by or available to the requestor, directed to the considerations set forth in paragraphs (b)(1) through (4) of this section, as applicable. To be considered complete, a waiver request must contain sufficient information, in addition to the content requirements under paragraphs (a) and (b) of this section, to allow the Secretary or designee to make a decision under this section. For advance waiver requests, such information shall include, at a minimum:

(1) An identification of all of the requestor's contractual arrangements involving the Government (including contracts, subcontracts, grants, or other arrangements) in which the technology involved in the contract was developed or used and any other funding of the technology by the Government, whether direct or indirect, involving any other party, of which the requestor is aware;

(2) A description of the requestor's past, current, and future private investment in and development of the technology which is the subject of the contract. This includes expenditures not reimbursed by the Government on research and development which will directly benefit the work to be performed under the instant contract, the amount and percentage of contract costs to be shared by the requestor, the out-of-pocket costs of facilities or equipment to be made available by the requestor for performance of the contract work which are not charged directly or indirectly to the Government under contract, and the contractor's plans and intentions to further develop and commercialize the technology at private expense;

(3) A description of competitive technologies or other factors which would ameliorate any anticompetitive effect of granting the waiver.

(4) Identification of whether the contract pertains to work that is classified, or sensitive, i.e., unclassified but controlled pursuant to section 148 of the Atomic Energy Action of 1954, as amended (42 U.S.C. 2168), or subject to export control under Chapter 17 of the Military Critical Technology List (MCTL) contained in Department of Defense Directive 5230.25 including identification of all principal uses of the subject matter of the contract, whether inside or outside the contractor program, and an indication of whether any such uses involve classified or sensitive technologies.

(5) Identification of all DOE and DOD programs and projects in the same general technology as the contract for which the requestor intends to be providing program planning advice or has provided program planning advice within the last three years.

(e) For identified invention requests under this section, such requests shall include at a minimum:

(1) A brief description of the intentions of the requestor (or its present or intended licensee) to commercialize the invention. This description should include:

(i) Estimated expenditures,

(ii) Anticipated steps,

(iii) The associated time periods to bring the invention to commercialization, and

(iv) A statement that requestor (or its present or intended licensee) has the capability to carry out its stated intentions.

(2) A description of any continuing Government funding of the development of the invention (including investigation of materials or processes for use therewith), from whatever Government source, whether direct or indirect, and, to the extent known by the requestor, any anticipated future Government funding to further develop the invention.

(3) A description of competitive technologies or other factors which would ameliorate any anticompetitive effects of granting the waiver.

(4) A statement as to whether or not the requestor would be willing to reimburse the Department of Energy for any and all costs and fees incurred by the Department in the preparation and prosecution of the patent applications covering the invention that is the subject of the waiver request.

(5) Where applicable, a statement of reasons why the request was not timely filed in accordance with the applicable patent rights clause of the contract, or why a request for an extension of time to file the request was not filed in a timely manner.

(6) Identification of whether the invention pertains to work that is classified, or sensitive, i.e., unclassified but controlled pursuant to section 148 of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2168), or subject to export control under Chapter 17 of the Military Critical Technology List (MCTL) contained in Department of Defense Directive 5230.25, including identification of all principal uses of the invention inside or outside the contractor program, and an indication of whether any such uses involve classified or sensitive technologies.

(7) Identification of all DOE and DOD programs and projects in the same general technology as the invention for which the requestor intends to be providing program planning advice or has provided program planning advice within the last three years.

(8) A statement of whether a classification review of the invention disclosure, any resulting patent application(s), and/or any reports and other documents disclosing a substantial portion of the invention, has been made, together with any determinations on the existence of classified or sensitive information in either the invention disclosure, the patent application(s), or reports or other documents disclosing a substantial portion of the invention; and

(9) Identification of any and all proposals, work for other activities, or other arrangements submitted by the requestor, DOE, or a third party, of which requestor is aware, which may involve further funding of the work on the invention at either the contractor facility where the invention arose or another facility owned by the Government.

(f) Patent Counsel will notify the requestor promptly if the waiver request is found not to be a complete request and, in that event, will provide the requestor with a reasonable period, not to exceed 60 days, to correct any such incompleteness. If requestor does not respond within the allotted time period, the waiver request will be considered to be withdrawn. If requestor responds within the allotted time period, but the submittal is still deemed incomplete or insufficient, the waiver request may be denied.

(g) As set forth in paragraph (c) of this section, waiver decisions shall be made within 150 days after the date on which a complete request for waiver of such rights, as specified in this section, has been submitted by the requestor to the DOE Patent Counsel. If the original waiver request does not result in a communication from DOE Patent Counsel indicating that the request is incomplete, the 150-day period for decision commences on the date of receipt of the waiver request. If the original waiver request results in a communication from DOE Patent Counsel indicating that the request is incomplete, the 150-day period for decision commences on the date on which supplementary information is received by Patent Counsel sufficient to make the waiver request complete. For advance waiver requests, if requestor is not notified that the request is incomplete, the 150-day period for decision commences on the date of receipt of the request, or on the date on which negotiation of contract terms is completed, whichever is later.

(h) Failure of DOE to make a patent waiver decision within the prescribed 150-day period shall in no way be construed as a grant of the waiver.

§ 784.7 Class waiver.

This section covers relinquishing of patent title rights by the Government to a class of persons or to a class of inventions. The authorization for class waivers is to be found at 42 U.S.C. 5908(c). Class waivers may be appropriate in situations where all members of a particular class would likely qualify for an advance or identified invention waiver. Normally, class waivers are originated by the Department. However, any person with a direct and substantial interest in a DOE program may request a class waiver by forwarding a written request therefor to the Patent Counsel. While no particular format for requesting a class waiver is prescribed, any request for a class waiver and any resulting determination by the Secretary or designee must address the pertinent objectives and considerations set forth in §§ 784.3(a), 784.4, 784.5, and 784.6.

§ 784.8 Procedures.

(a) All requests for waivers shall be in writing. Each request for a waiver other than a class waiver shall include the information set forth in § 784.9. Such requests may be submitted by existing or prospective contractors in the case of requests for an advance waiver and by contractors, including successor contractors at a facility, or employee-inventors in the case of requests for waiver of identified inventions.

(b) A request for an advance waiver should be submitted to the Contracting Officer (subcontractors may submit through their prime contractors) at any time prior to execution of the contract or subcontract, or within thirty days thereafter, or within such longer period as may be authorized by Patent Counsel for good cause shown in writing. If the purpose, scope, or cost of the contract is substantially altered by modification or extension after the waiver is granted, a new waiver request will be required. When advance waivers are granted, the provisions of the “Patent Rights—Waiver” clause set forth in § 784.12 shall be used in contracts which are the subject of the waivers, unless modified with the approval of the Patent Counsel to conform to the scope of the waiver granted. (See § 784.12.) Advance waivers may be requested for all inventions which may be conceived or first actually reduced to practice under a DOE contract. An advance waiver may also be requested for an identified invention conceived by the contractor before the contract but which may be first actually reduced to practice under the contract. Such waiver request must include a copy of any patent or patent application covering the identified invention, or if no patent application has been filed, a complete description of the invention.

(c) A request for waiver (other than an advance or class waiver) for an identified invention must be submitted to the Patent Counsel at the time the invention is to be reported to DOE or not later than eight months after conception and/or first actual reduction to practice, whichever occurs first in the course of or under the contract, or such longer period as may be authorized by Patent Counsel for good cause shown in writing by the requestor. The time for submitting a waiver request will not normally be extended past the time the invention has been advertised for licensing by DOE. If the Government has already filed a patent application on the invention, the requestor should indicate whether or not it is willing to reimburse the Government for the costs of searching, prosecution, filing and maintenance fees, in the event the waiver is granted.

(d) If the request for waiver contains insufficient information, the Patent Counsel may seek additional information from the requestor and from other sources. The Patent Counsel will thoroughly analyze the request in view of each of the objectives and considerations and shall also consider the overall rights obtained by the Government in the patent, copyright, and data clauses of the contract. Where it appears that a waiver of a lesser part of the rights of the United States than requested would be more appropriate in view of the policies set forth, the Patent Counsel should attempt to negotiate a compromise acceptable to both the requestor and DOE. If approval of a waiver is recommended, Patent Counsel shall obtain an indication of agreement by the requestor to the proposed waiver scope, terms and conditions.

(e) The Patent Counsel will prepare a Statement of Considerations setting forth the rationale for either approving or denying the waiver request and will forward the Statement to the General Counsel or designee for review thereof. While the Statement need not provide specific findings as to each and every consideration of § 784.4 or § 784.5 of this part, it will cover those that are decisive, and it will explain the basis for the recommended determination. There may be occasions when the application of the various individual considerations of § 784.4 or § 784.5 of this part to a particular case could conflict, and in those instances the conflict will be reconciled giving due regard to the overall policies set forth in 784.3(a) (1) through (4).

(f) The Patent Counsel will also obtain comments from the appropriate DOE program organization to assist the Patent Counsel in the waiver determination. Additionally, if any other Federal Government entity has provided funding or will be providing funding, or if a subject invention has been made in whole or in part by an employee of that entity, Patent Counsel shall obtain permission to waive title to the undivided interest in the invention from the cognizant official of that entity. In situations where time does not permit a delay in contract negotiations for the preparation and mailing of a full written statement, field Patent Counsel may submit a recommendation on the waiver orally to the Assistant General Counsel for Technology Transfer and Intellectual Property, who upon verbal consultation with the appropriate DOE program organization, shall provide a verbal decision to field Patent Counsel. All oral actions shall be promptly confirmed in writing. In approving waiver determinations, the Secretary or designee shall objectively review all requests for waiver in view of the objectives and considerations set forth in §§ 784.3 through 784.6. If the determination and the rationale therefor is not accurately reflected in the Statement of Considerations which has been submitted for approval, a new Statement of Considerations shall be prepared.

(g) In the event that a request for advance waiver is approved after the effective date of the contract, the Patent Counsel shall promptly notify the requestor by letter of the determination and the basis therefor. The letter shall state the scope, terms and conditions of such waiver. If the terms and conditions of an approved advance waiver were not incorporated in the contract when executed, the letter shall inform the requestor that the advance waiver shall be effective as of the effective date of the contract for an advance waiver of inventions identified, i.e., conceived prior to the effective date of the contract, or as of the date the invention is reported with an election by the contractor to retain rights therein, i.e., for an invention conceived or first actually reduced to practice after the effective date of the contract; provided a copy of the letter is signed and returned to the Contracting Officer by the requestor acknowledging the acceptance of the scope, terms and conditions of the advance waiver. After acceptance by the contractor of an advance waiver, the Contracting Officer shall cause a unilateral no-cost modification to be made to the contract incorporating the terms and conditions of the waiver in lieu of previous patent rights provisions.

(h) In the event that a waiver request is denied, the requestor may, within thirty days after notification of the denial, request reconsideration. Such a request shall include any additional facts and rationale not previously submitted which support the request. Request for reconsideration shall be submitted and processed in accordance with the procedures for submitting waiver requests set forth in this section.

§ 784.9 Content of waiver requests.

(a) Forms (OMB No. 1901-0800) for submitting requests for advance and identified invention waivers, indicating the necessary information, may be obtained from the Contracting Officer or Patent Counsel. All requests for advance and identified invention waivers shall include the following information:

(1) The requestor's identification, business address, and, if represented by Counsel, the Counsel's name and address;

(2) An identification of the pertinent contract or proposed contract and a copy of the contract Statement of Work or a nonproprietary statement which fully describes the proposed work to be performed;

(3) The nature and extent of waiver requested;

(4) A full and detailed statement of facts, to the extent known by or available to the requestor, directed to each of the considerations set forth in §§ 784.4 or 784.5 of this part, as applicable, and a statement applying such facts and considerations to the policies set forth in § 784.3 of this part. It is important that this submission be tailored to the unique aspects of each request for waiver, and be as complete as feasible; and

(5) The signature of the requestor or authorized representative with the following statement: “The facts set forth in this request for waiver are within the knowledge of the requestor and are submitted with the intention that the Secretary or designee rely on them in reaching the waiver determination.”

(b) In addition to the requirements of paragraph (a) of this section, requests for waiver of identified inventions shall include:

(1) The full names of all inventors;

(2) A statement of whether a patent application has been filed on the invention, together with a copy of such application if filed or, if not filed, a complete description of the invention;

(3) If a patent application has not been filed, any information which may indicate a potential statutory bar to the patenting of the invention under 35 U.S.C. 102 or a statement that no such bar is known to exist; and

(4) Where the requestor is the inventor, written authorization from the applicable contractor or subcontractor permitting the inventor to request a waiver.

(c) Subject to statutes, DOE regulations, requirements, and restrictions on the treatment of proprietary and classified information; all material submitted in requests for waiver or in support thereof will be made available to the public after a determination on the waiver request has been made, regardless of whether a waiver is granted. Accordingly, requests for waiver should not normally contain information or data that the requestor is not willing to have made public. If proprietary or classified information is needed to make the waiver determination, such information shall be submitted only at the request of Patent Counsel.

§ 784.10 Record of waiver determinations.

The Assistant General Counsel for Technology Transfer and Intellectual Property shall maintain and periodically update a publicly available record of waiver determinations.

§ 784.11 Bases for granting waivers.

(a) The various factual situations which are appropriate for waivers cannot be categorized precisely because the appropriateness of a waiver will depend upon the manner in which the considerations set forth in §§ 784.4 or 784.5, and 784.6 if applicable, of this part relate to the facts and circumstances surrounding the particular contracting situation or the particular invention, in order to best achieve the objectives set forth in § 784.3 of this part. However, some examples where advance waivers might be appropriate are:

(1) Cost-shared contracts;

(2) Situations in which DOE is providing increased funding to a specific ongoing privately-sponsored research, development, or demonstration project;

(3) Situations such as Work for Others Agreements, User Facility Agreements or CRADAs, involving DOE-approved private use of Government facilities where the waiver requestor is funding a substantial part of the costs; and

(4) Situations in which the equities of the contractor are so substantial in relation to that of the Government that the waiver is necessary to obtain the participation of the contractor.

(b) Waivers may be granted as to all or any part of the rights of the United States to an invention subject to certain rights retained by the United States as set forth in § 784.12 of this part. The scope of the waiver will depend upon the relationship of the contractual situation or identified invention to considerations set forth in §§ 784.4 or 784.5, and 784.6, if applicable, in order to best achieve the objectives set forth in § 784.3. For example, waivers may be restricted to a particular field of use in which the contractor has substantial equities or a commercial position, or restricted to those uses that are not the primary object of the contract effort. Waivers may also be made effective for a specified duration of time, may be limited to particular geographic locations, may require the contractor to license others at reduced royalties in consideration of the Government's contribution to the research, development, or demonstration effort, or may require return of a portion of the royalties or revenue to the Government.

(c) Contractors shall not use their ability to award subcontracts as economic leverage to acquire rights for themselves in the subcontractor inventions, where the subcontractor(s) would prefer to petition for title. A waiver granted to a prime contractor is not normally applicable to inventions of subcontractors. However, in appropriate circumstances, the waiver given to the prime contractor may be made applicable to the waivable inventions of any or all subcontractors, such as where there are pre-existing special research and development arrangements between the prime contractor and subcontractor, or where the prime contractor and subcontractor are partners in a cooperative effort. In addition, in such circumstances, the prime contractor may be permitted to acquire nonexclusive licenses in the subcontractors' inventions when a waiver of the subcontractor inventions is not covered by the prime contractor's waiver.

(d) In advance waivers of identified inventions, the invention will be deemed to be a subject invention and the waiver will be considered as being effective as of the effective date of the contract (see § 784.13(a)). This will be true regardless of whether the identified invention had been first actually reduced to practice prior to the time of contracting or would be reduced to practice under the contract or after expiration of the contract. One purpose of advance waivers of identified inventions is to establish the rights of the parties to such inventions when the facts surrounding the first actual reduction to practice prior to or during the contract are or will be difficult to establish.

§ 784.12 Terms and conditions of waivers.

The terms and conditions for waivers are set forth in the “Patent Rights—Waiver” clause in this section. A waiver of all foreign and domestic patent rights under a contract authorizes the use of this clause with any additions prescribed by the DOE Acquisition Regulations (48 CFR Chapter 9) or the terms of the waiver. This clause shall not be used in contracts with small business firms or nonprofit organizations subject to 35 U.S.C. 200 et seq. If a waiver of different scope is granted, the clause shall be modified to conform to the scope of the waiver granted. Advance waivers for arrangements other than contracts, grants, and cooperative agreements may use other clause provisions approved by the Assistant General Counsel for Technology Transfer and Intellectual Property, except that all waivers for funding agreements shall be subject to the license of clause paragraph (b) and the provisions of clause paragraphs (i) and (j). The terms and conditions of the clause shall also constitute the basis for confirmatory licenses regarding waivers of identified inventions. For inventions under advance waivers, a duly executed and approved instrument fully confirmatory of all rights to which the Government is entitled is required to be submitted promptly after filing a patent application thereon. If, however, a waiver request is pending, delivery of the confirmatory instrument may be delayed until a determination on the waiver request is made. In the case of a waiver of an identified invention pursuant to a request for greater rights, the confirmatory instrument shall be agreed to or submitted to Patent Counsel before or at the time the waiver is granted.

Patent Rights—Waiver

Use the clause at 48 CFR 52.227-12 with the following changes:

(1) In paragraph (a) “Definitions” add the following definitions:

Background patent means a domestic patent covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the Contractor at any time through the completion of this contract:

(i) Which the Contractor, but not the Government, has the right to license to others without obligation to pay royalties thereon, and

(ii) Infringement of which cannot reasonably be avoided upon the practice of any specific process, method, machine, manufacture or composition of matter (including relatively minor modifications thereof) which is a subject of the research, development, or demonstration work performed under this contract.

Contract means any contract, grant, agreement, understanding, or other arrangement, which includes research, development, or demonstration work, and includes any assignment or substitution of parties.

DOE patent waiver regulations means the Department of Energy patent waiver regulations at 10 CFR part 784.

Patent Counsel means the Department of Energy Patent Counsel assisting the procuring activity.

Secretary means the Secretary of Energy.

(2) In paragraph (a) in the definition of “Subject invention” substitute: “course of or” for: “performance of work”.

(3) In paragraph (b) “Allocation of principal rights,” add at the beginning of first sentence:

“Whereas DOE has granted a waiver of rights to subject inventions to the Contractor,”.

(4) In paragraph (c)(1), substitute:

“Patent Counsel within six months after conception or first actual reduction to practice, whichever occurs first in the course of or under this contract, but in any event, prior to any sale, public use, or public disclosure of such invention known to the Contractor.” for.

“Contractor officer within 2 months after the inventor discloses it in writing to Contractor Personnel responsible for Patent matters * * * earlier.”

(5) In paragraph (c)(2) add at the end: “The Contractor shall notify the Patent Counsel as to those countries (including the United States) in which the Contractor will retain title not later than 60 days prior to the end of the statutory period.”

(6) In paragraph (c)(3) substitute: “but not later than at least 60 days” for “or, if earlier,”

(7) In paragraph (d) add (d)(5):

“(5) If the waiver authorizing the use of this clause is terminated as provided in paragraph (p) of this clause.”

(8) In paragraph (e)(1) add: “under paragraph (d) of this clause” after “Government obtains title.”

(9) In paragraph (e)(2) substitute “37 CFR part 404 and DOE licensing regulations.” for “the Federal Property Management regulations and agency licensing regulations (if any)”

(10) In paragraph (f)(5) substitute “the course of or” for “performance of work”.

(11) In paragraph (g) substitute paragraphs (1), (2) and (3) as follows:

(1) Unless otherwise directed by the Contracting Officer, the Contractor shall include the clause at 48 CFR 952.227-11, suitably modified to identify the parties, in all subcontracts, regardless of tier, for experimental, developmental, or research work to be performed by a small business firm or nonprofit organization, except where the work of the subcontract is subject to an Exceptional Circumstances Determination by DOE. In all other subcontracts, regardless of tier, for experimental, developmental, demonstration, or research work, the Contractor shall include the patent rights clause at 48 CFR 952.227-13 (suitably modified to identify the parties).

(2) The Contractor shall not, as part of the consideration for awarding the subcontract, obtain rights in the subcontractor's subject inventions.

(3) In the case of subcontractors at any tier, Department, the subcontractor, and Contractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and the Department with respect to those matters covered by this clause.

(12) Substitute the following for paragraph (k):

(k) Background Patents

(1) The Contractor agrees:

(i) to grant to the Government a royalty-free, nonexclusive license under any Background Patent for purposes of practicing a subject of this contract by or for the Government in research, development, and demonstration work only.

(ii) that, upon written application by DOE, it will grant to responsible parties for purposes of practicing a subject of this contract, nonexclusive licenses under any Background Patent on terms that are reasonable under the circumstances. If, however, the Contractor believes that exclusive or partially exclusive rights are necessary to achieve expeditious commercial development or utilization, then a request may be made to DOE for DOE approval of such licensing by the Contractor.

(2) Notwithstanding paragraph (k)(1)(ii), the Contractor shall not be obligated to license any Background Patent if the Contractor demonstrates to the satisfaction of the Secretary or his designee that:

(i) a competitive alternative to the subject matter covered by said Background Patent is commercially available from one or more other sources; or

(ii) the Contractor or its licensees are supplying the subject matter covered by said Background Patent in sufficient quantity and at reasonable prices to satisfy market needs, or have taken effective steps or within a reasonable time are expected to take effective steps to so supply the subject matter.

(13) Add new paragraph (l) Communications as follows:

All reports and notifications required by this clause shall be submitted to the Patent Counsel unless otherwise instructed.

(14) In paragraph (m) add to end of sentence: “, except with respect to Background Patents, above.”

(15) In paragraph (n)(4) substitute “conducted in such a manner as” for “subject to appropriate conditions.”

(16) In paragraph (o) add at the end of the parenthetical phrase in the heading to the paragraph: “or grants”.

(17) In paragraph (o) add paragraph (o)(1)(v) as follows:

(v) Convey to the Government, using a DOE-approved form, the title and/or rights of the Government in each subject invention as required by this clause.

(18) In paragraph (o), substitute the following for (o)(3):

(3) Final payment under this contract shall not be made before the Contractor delivers to the Patent Counsel all disclosures of subject inventions required by paragraph (c)(1) of this clause, an acceptable final report pursuant to paragraph (f)(7)(ii) of this clause, and all past due confirmatory instruments, and the Patent Counsel has issued a patent clearance certification to the Contracting Officer.

(19) Add paragraphs (p), (q), (r), and (s) as follows:

(p) Waiver Terminations.

Any waiver granted to the Contractor authorizing the use of this clause (including any retention of rights pursuant thereto by the Contractor under paragraph (b) of this clause) may be terminated at the discretion of the Secretary or his designee in whole or in part, if the request for waiver by the Contractor is found to contain false material statements or nondisclosure of material facts, and such were specifically relied upon by DOE in reaching the waiver determination. Prior to any such termination, the Contractor will be given written notice stating the extent of such proposed termination and the reasons therefor, and a period of 30 days, or such longer period as the Secretary or his designee shall determine for good cause shown in writing, to show cause why the waiver of rights should not be so terminated. Any waiver termination shall be subject to the Contractor's minimum license as provided in paragraph (e) of this clause.

(q) Atomic Energy.

No claim for pecuniary award or compensation under the provisions of the Atomic Energy Act of 1954, as amended, shall be asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in the course of or under this contract.

(r) Publication.

It is recognized that during the course of work under this contract, the Contractor or its employees may from time to time desire to release or publish information regarding scientific or technical developments conceived or first actually reduced to practice in the course of or under this contract. In order that public disclosure of such information will not adversely affect the patent interests of DOE or the Contractor, approval for release of publication shall be secured from Patent Counsel prior to any such release or publication. In appropriate circumstances, and after consultation with the Contractor, Patent Counsel may waive the right of prepublication review.

(s) Forfeiture of rights in unreported subject inventions.

(1) The Contractor shall forfeit and assign to the Government, at the request of the Secretary of Energy or designee, all rights in any subject invention which the Contractor fails to report to Patent Counsel within six months after the time the Contractor:

(i) Files or causes to be filed a United States or foreign patent application thereon; or

(ii) Submits the final report required by paragraph (e)(2)(ii) of this clause, whichever is later.

(2) However, the Contractor shall not forfeit rights in a subject invention if, within the time specified in paragraph (m)(1) of this clause, the Contractor:

(i) Prepares a written decision based upon a review of the record that the invention was neither conceived nor first actually reduced to practice in the course of or under the contract and delivers the decision to Patent Counsel, with a copy to the Contracting Officer; or

(ii) Contending that the subject invention is not a subject invention, the Contractor nevertheless discloses the subject invention and all facts pertinent to this contention to the Patent Counsel, with a copy to the Contracting Officer, or

(iii) Establishes that the failure to disclose did not result from the Contractor's fault or negligence.

(3) Pending written assignment of the patent application and patents on a subject invention determined by the Contracting Officer to be forfeited (such determination to be a Final Decision under the Disputes clause of this contract), the Contractor shall be deemed to hold the invention and the patent applications and patents pertaining thereto in trust for the Government. The forfeiture provision of this paragraph shall be in addition to and shall not supersede any other rights and remedies which the Government may have with respect to subject inventions.

§ 784.13 Effective dates.

Waivers shall be effective on the following dates:

(a) For advance waivers of identified inventions, i.e., inventions conceived prior to the effective date of the contract, on the effective date of the contract, even though the advance waiver may have been requested after that date;

(b) For identified inventions under advance waivers, i.e., inventions conceived or first actually reduced to practice after the effective date of the contract, on the date the invention is reported with the election to retain rights as to that invention; and

(c) For waivers of identified inventions (other than under an advance waiver), on the date of the letter from Patent Counsel notifying the requestor that the waiver has been granted.

PART 800 LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE

Authority: Sec. 211(e) of the Department of Energy (DOE) Organization Act, Pub. L. 95-91, Title II, as amended by Pub. L. 95-619, Title VI, sec. 641, Nov. 9, 1978, 92 Stat. 3284 (42 U.S.C. 7141).

Source: 46 FR 44689, Sept. 4, 1981, unless otherwise noted.

Subpart A General

§ 800.001 Purpose.

The purpose of this regulation is to set forth policies and procedures for the award and administration of loans to minority business enterprises. The loans are to assist such enterprises in participating fully in research, development, demonstration and contract activities of the Department of Energy. The loans are to defray a percentage of the cost of obtaining DOE contracts and other agreements, including procurements, cooperative agreements, grants, loans and loan guarantees; of obtaining subcontracts with DOE operating contractors; and of obtaining contracts with first-tier subcontractors of DOE operating contractors in furtherance of the research, development, demonstration or other contract activities of DOE. Issuance of loans under this regulation is limited to the extent funds are provided in advance in appropriation acts. This regulation implements the authority for such loans in section 211(e) of the Department of Energy (DOE) Organization Act, Public Law 95-619, title VI, section 641, November 9, 1978, 92 Stat. 3284 (42 U.S.C.A. 7141).

[48 FR 17574, Apr. 25, 1983]

§ 800.002 Program management.

Program management responsibility for financial assistance awarded under this regulation has been assigned to the Office of Minority Economic Impact.

§ 800.003 Definitions.

For the purpose of this regulation:

Act means the DOE Organization Act, Public Law 95-91, title II, as amended by the National Energy Conservation Policy Act, Public Law 95-619, title VI, section 641.

Applicant means a minority business enterprise which is seeking a loan under this regulation.

Application Approving Official means the Director of the Office of Minority Economic Impact.

Application Evaluation Panel (also referred to as the Panel) means a team of Federal employees appointed by the Application Approving Official to evaluate loan applications and make approval or disapproval recommendations regarding such applications.

Borrower means an applicant who enters into a loan agreement with DOE.

Contracting Officer means the DOE official warranted and authorized to contractually bind the Department of Energy and execute written agreements that are binding on the Department.

Costs of a bid or proposal means the cost of preparing, submitting and supporting a bid or proposal, whether solicited or not, for a DOE contract or other agreement such as a procurement contract, grant, cooperative agreement, loan or loan guarantee; or a subcontract with a DOE operating contractor; or a contract with a first-tier subcontractor of a DOE operating contractor in furtherance of the research, development, demonstration or other contract activities of DOE.

Default means the actual failure by the borrower to make payment of principal or interest in accordance with the terms and conditions of a loan issued under this regulation, or the failure of the borrower to meet any other requirement specified as a default condition in the loan agreement.

Director means the Director of the Office of Minority Economic Impact (OMEI).

Loan, in reference to a loan made pursuant to the regulation, means a transaction in which a contractual instrument (“loan agreement”) is executed between the United States, as lender, acting through the Secretary of Energy, and a borrower. The instrument must obligate the United States to provide the borrower with a specified amount(s) of United States funds for a specified period of time and must obligate the borrower to use the moneys to bid for and attempt to obtain contracts and other agreements relating to DOE research, development, demonstration and contract activities, and to repay the moneys at a specified time at an agreed rate of interest. The words ‘loan’, ‘loan agreement’ and ‘transaction’ include (where the context does not require otherwise) the terms and conditions of related documents, such as the borrower's note or bond or other evidence of, or security for, the borrower's indebtedness.

Minority Business Enterprise means a firm including a sole proprietorship, corporation, association, or partnership which is at least 50 percent owned or controlled by a member of a minority or group of members of a minority. For the purpose of this definition, ‘control’ means direct or indirect possession of the power to direct, or cause the direction of, management and policies, whether through the ownership of voting securities, by contract or otherwise. An individual who is a citizen of the United States and who is a Negro, Puerto Rican, American Indian, Eskimo, Oriental, or Aleut, or is a Spanish speaking individual of Spanish descent, is a member of a “minority” as used in this regulation.

Operating Contractors means contractors under contracts having one of the following purposes, in accordance with the provisions of § 9.50.001(a)(1) of the DOE procurement regulations (title 41 CFR part 9-50):

(a) DOE prime contracts for the management of Federal Government-owned laboratories, production plants, and research facilities located on Federal Government-owned or Federal Government-leased sites, where the programs being conducted are considered of a long-term, continuing nature; or

(b) DOE prime contracts for the operation of Federal Government-owned facilities located on contractor-owned or leased sites where the programs being conducted are of a long-term, continuing nature. An example of this category would be those contracts with universities for the operation of Federal Government-owned facilities, for the purpose of conducting long-term basic research programs.

(c) Other contracts performed on sites owned by the Federal Government when so designated by the appropriate procurement official.

Secretary means the Secretary of the Department of Energy or his delegate.

[46 FR 44689, Sept. 4, 1981, as amended at 48 FR 17574, Apr. 25, 1983]

§ 800.004 Eligibility.

In order to be eligible for a loan, an applicant must be a minority business enterprise as defined in § 800.003.

Subpart B Loan Solicitation, Application and Review

§ 800.100 Solicitation of applications.

The Secretary will periodically issue an announcement soliciting applications under this regulation. The announcement will be published in the Federal Register, synopsized in the Commerce Business Daily, and circulated to minority trade associations and organizations and to the Minority Business Development Agency and Small Business Administration. The announcement will indicate funds availability, eligibility requirements, application instructions, interest rates, maturities and other key loan terms and any applicable restrictions. In such solicitations, DOE shall further indicate that, in the case of applications for loans relating to bids or proposals for contracts with first-tier subcontractors of DOE operating contractors, information necessary to substantiate such applications may be unavailable to DOE from such subcontractors. If the substantiating information is not made available to DOE in a timely manner, the application may be rejected.

[46 FR 44689, Sept. 4, 1981, as amended at 48 FR 17574, Apr. 25, 1983]

§ 800.101 Application requirements.

(a) Applications for loans shall be filed, one original and three copies with: Department of Energy, Washington, DC 20585, Attention: Announcement No. DE-PS60-MI.

(b) An application for a loan under this regulation must include the following information. Items described in paragraphs (b)(1) through (7) of this section may be submitted for preliminary review in advance of a specific loan request but must be updated at time of loan request to reflect substantial changes.

(1) Applicant's name and address, with a description of the kind and size of its business, its business experience and its history as a minority business enterprise.

(2) Financial statements of applicant and its principals, including source of revenue and balance sheets for the current year and, as to applicant, for the two preceding years of applicant's existence as a business entity. The Secretary may require applicant to provide certification by a public accountant, or other certification acceptable to the Secretary.

(3) A description of any other Federal financial backing (direct loans, guaranteed loans, grants, etc.) applied for or obtained by the applicant within the previous five years, or expected to be applied for.

(4) A description of applicant's management structure, with list of applicant's key persons with their responsibilities and qualifications.

(i) In the case of a specific loan request this list should include any contractor or consultant whose services are proposed in connection with the bid or proposal for which the loan is sought.

(5) Affidavit(s) of eligibility (see § 800.004).

(6) Documentation as to applicant's authority to undertake the activities contemplated by the application. Such documentation shall take substantially the following form:

(i) If the applicant is a corporation, a copy of the charter or certificate and articles of incorporation, with any amendments, duly certified by the Secretary of State of the State where organized, and a copy of the by-laws. There shall also be included a copy of all minutes, resolutions of stockholders or directors or other representatives of the applicant, properly attested, authorizing the filing of the application.

(ii) If the applicant is an association, a verified copy of its articles of association, if any, with an attested copy of the resolution of its governing board, if any, authorizing the filing of the application.

(iii) If the applicant is a business trust, a verified copy of the trust instrument and an attested copy of the resolution or other authority under which the application is made.

(iv) If the applicant is a joint stock company, a verified copy of the articles of association and of the authorizing resolution.

(v) If the application is made on behalf of a partnership, a copy of the partnership agreement, if any; if on behalf of a limited partnership, a duly certified copy, also, of the certificate of limited partnership, if such certificate is required to be obtained under state law governing such limited partnership.

(7) Credit references.

(8) Information on the award to be sought through the bid or proposal, as follows:

(i) Title, and whether in response to a solicitation or unsolicited.

(ii) Brief description of work to be performed.

(iii) Sponsoring DOE office, including solicitation number, if any.

(iv) If an unsolicited proposal is planned, the loan application shall indicate the appropriate DOE program personnel to be consulted as to whether there is potential for the proposal to be supported.

(v) Schedule for preparation and submission of the bid or proposal.

(9) Itemized cost estimates (and whether yet incurred).

(10) The required loan amount, not to exceed 75 percent of total bid or proposal costs, in accordance with § 800.200 on allowable costs.

(11) Requested loan maturity, in accordance with § 800.202(a)(3).

(12) How applicant will finance performance of work under a successful bid or proposal.

(13) Such other information as the Application Approving Official may deem necessary for evaluation in accordance with § 800.103 and for compliance with the provisions of this regulation.

(14) The application shall be signed by the applicant or on behalf of the applicant by an authorized representative. Verification may be by affidavit of an authorized representative of an applicant; attestation shall be by the authorized officer of an applicant.

Note:

Title 18 United States Code, section 1001 provides criminal penalties for fraud and intentional false statements in information submitted in such an application.

§ 800.102 Review by Application Evaluation Panel.

(a) Applications for loans under this regulation shall be reviewed by an Application Evaluation Panel, which shall be appointed by the Application Approving Official. The Panel shall include, at a minimum, a representative of the Office of Minority Economic Impact, the contracting officer and a representative of the Office of the Controller.

(b) Panel review shall be conducted pursuant to paragraph (c) or (d) of this section, as applicable, to evaluate, to clarify and to develop information contained in the application and such other information as the Application Approving Official or the Panel may request.

(1) The Panel shall give priority to applications relating to a competitive solicitation, because of time limits on such solicitations. The Panel may defer action a maximum of five days after a solicitation has been announced in the Commerce Business Daily to provide all interested applicants an opportunity to apply.

(2) Initial screening will be in the order applications are received, but time required to process an application may vary from case to case.

(c) Panel review of specific loan requests. (1) If an application contains a specific loan request, and complies with § 800.101, the Panel shall arrange for risk analysis, independent of any such analysis submitted by or on behalf of the applicant. Risk analysis shall be directed both to the loan request and to applicant's prospective performance of work pursuant to the bid or proposal.

(2) The Panel shall evaluate the loan request in light of the risk analysis, and shall give its conclusions in writing to the Application Approving Official, with respect to the following and to such other considerations as that official may direct:

(i) Applicant's eligibility as a minority business enterprise.

(ii) Compliance with the application requirements of § 800.101.

(iii) Compliance with § 800.200 on allowable costs.

(iv) Applicant's financial ability to make the bid or proposal without the loan.

(v) Applicant's contribution of, or ability to contribute, the 25% minimum share of allowable costs, or more.

(vi) Applicant's ability to prepare an adequate bid or proposal, if the loan is made.

(vii) Possibility of award to applicant pursuant to its bid or proposal.

Note:

Normally, not more than three loans will be approved for the same competitive award.

(viii) Applicant's ability to perform pursuant to the bid or proposal.

(ix) Likelihood that applicant will repay the requested loan, regardless of success of applicant's bid or proposal.

(x) Optimal use of available program funds.

(xi) The Panel's recommendation.

(d) Panel review of other applications. If the application was submitted without a specific loan request, the Panel shall review the application in accordance with paragraph (b) of this section with the limited purpose of determining whether the applicant has complied with § 800.101, except as to matters determinable only with respect to a future specific loan request, and shall inform the Application Approving Official in writing as to its determinations.

§ 800.103 Review by Application Approving Official.

(a) The Application Approving Official shall consider the results of the Panel's review under section 102 (c) or (d), and such other information as the Application Approving Official determines to be relevant pursuant to the provisions of this regulation, and shall either approve or disapprove the application, giving it priority in accordance with the provisions of § 800.102(b).

(b) The Application Approving Official shall authorize a contracting officer to notify the applicant of approval or disapproval.

(c) An applicant whose application has been rejected will be informed, on request, of the reason for rejection. Rejection is not a bar to submission of an appropriately revised application.

Subpart C Loans

§ 800.200 Maximum loan; allowable costs.

(a) A loan under this regulation shall not exceed 75 percent of allowable costs of a bid or proposal to obtain a DOE contract or other agreement (such as a procurement contract, cooperative agreement, grant, loan or loan guarantee), or a subcontract with a DOE operating contractor, or a contract with a first-tier subcontractor of a DOE operating contractor in furtherance of the research, development, demonstration or other contract activities of DOE.

(b) To be allowable, costs must, in DOE's judgment:

(1) Be consistent with the bidding cost principles of the Federal Procurement Regulation (41 CFR Ch. 1, 1-15.205-3) and DOE Procurement Regulation (41 CFR Ch. 9, 9-15.205-3); and;

(2) Be necessary, reasonable and customary for the bid or proposal contemplated by the application; and

(3) Be incurred, or expected to be incurred, by the applicant.

(c) Costs which are, in general, allowable, if consistent with paragraph (b) of this section include, but are not limited to:

(1) Bid bond premiums.

(2) Financial, accounting, legal, engineering and other professional, consulting or similar fees and service charges.

(3) Printing and reproduction costs.

(4) Travel and transportation costs.

(5) Costs of the loan application under this rule.

(d) Costs that are not considered as allowable costs include the following:

(1) Fees and commissions charged to the applicant, including finder's fees, for obtaining Federal funds.

(2) Expenses, which, in DOE's judgment, have primarily an application broader than the specific loan request.

(3) Costs which, in DOE's judgment, fail to conform to paragraph (b) of this section.

[46 FR 44689, Sept. 4, 1981, as amended at 48 FR 17574, Apr. 25, 1983]

§ 800.201 Findings.

A loan shall issue under this regulation only if the Secretary, having reviewed the action of the Application Approving Official, and having considered such other information as the Secretary may deem pertinent, has made all the findings that follow:

(a) That the applicant is a minority business enterprise.

(b) That the loan will assist the enterprise to participate in the research, development, demonstration or contract activities of the Department of Energy by providing funds needed by applicant for bid or proposal purposes.

(c) That, by terms of the loan, applicant's use of the funds will be limited to bidding for and obtaining a contract or other agreement with the Department of Energy, a subcontract with a DOE operating contractor, or a contract with a first-tier subcontractor of a DOE operating contractor in furtherance of the research, development, demonstration or other contract activities of DOE.

(d) That the funds to be loaned will not exceed 75% of applicant's costs in bidding for and obtaining the contract or agreement.

(e) That the rate of interest on the loan has been determined in consultation with the Secretary of the Treasury.

(f) That there is a reasonable prospect that the applicant will make the bid or proposal which is the purpose of the loan, will perform according to its bid or proposal, and will repay the loan according to the terms thereof, regardless of the success of its bid or proposal.

(g) That the terms and conditions of the loan are acceptable to the Secretary and comply with this regulation and with section 211(e) of the Department of Energy Organization Act.

[46 FR 44689, Sept. 4, 1981, as amended at 48 FR 17574, Apr. 25, 1983]

§ 800.202 Loan terms and conditions.

(a) The loan shall be based upon a loan agreement and the borrower's separate promissory note for the proceeds of the loan, including interest. The agreement and note shall be executed in writing between the borrower and the Secretary. The contracting officer shall execute the loan agreement on behalf of the Secretary. The loan agreement and the promissory note shall provide as follows, either at full length or by incorporation by reference to terms of the other of the two documents.

(1) The borrower agrees to repay the loan of funds provided by the Secretary.

(2) The interest rate on the loan is as established in consultation with the Secretary of the Treasury, taking into consideration the current average market yields of outstanding marketable obligations of the United States having maturities comparable to the loan.

(3) The loan shall be repaid over a maximum period as follows, in equal monthly installments of principal and interest, unless a different frequency of installments is specified by the Secretary:

Loan value | Maximum repayment 1

$0—$5,000 | 3 years 3 months.

$5,000—$25,000 | 5 years 3 months.

Excess of $25,000 | 8 years 3 months.

1 Maximum repayment period from date of initial disbursement.

Repayment of principal and interest shall begin within 90 days following the initial loan disbursement or such longer period as may be acceptable to the Secretary. Installments shall be applied to accrued interest first and then to repayment of principal. Past due installments shall accrue interest at the quarterly current-value-of-funds-rate specified by the Treasury for overdue accounts. Prepayments may be made at any time without penalty.

(4) The borrower shall have appropriate opportunities, as specified in the loan agreement, to cure any default, failure, or breach of any of the covenants, conditions and obligations undertaken by the borrower pursuant to the provisions of the loan agreement.

(5) Loans of $10,000 or less will be disbursed in a single disbursement. Disbursement of loans larger than $10,000 shall be per schedule and documentation specified by the Secretary.

(6) The loan may be used by the borrower to defray as much as, but no more than, 75 percent of the cost of the bid or proposal within the limitations specified in § 800.200, on allowable costs. Costs incurred by the borrower prior to the effective date of the loan agreement, and allowable under § 800.200, may be credited toward the borrower's share of costs if, in DOE's judgment, they were primarily related to the bid or proposal, but shall not be reimbursed from the loan.

(7) The borrower shall make periodic reports regarding the bid or proposal.

(8) The borrower shall maintain good standing under Federal, State and local laws and regulations applicable to the conduct of its business, including current payment of all taxes, fees and other charges and all requisite licenses and other governmental authorization necessary for the continued operation of the business throughout the term of the loan.

(9) The borrower shall remain a minority business enterprise throughout the term of the loan.

(10) The borrower shall return funds disbursed, but not required together with accrued interest thereon, to DOE, or to the servicing agent, if applicable, when its bid or proposal is ready for submission. The return of unrequired funds shall be by check separate from any payment of interest or principal, shall be identified by the borrower as a return of unrequired funds, and shall be accompanied by the borrower's certification that so much of the loan as has been disbursed to the borrower and not returned has been, or will be, expended by the borrower for costs allowable under § 800.200.

(11) Such other provisions as the Secretary deems appropriate.

(b) The loan agreement shall also provide for loan servicing and monitoring in accordance with § 800.300 and § 800.301, loan limitation in accordance with § 800.302, assignment and transfer in accordance with § 800.303, default in accordance with § 800.304 and appeals in accordance with § 800.307.

(c) The Secretary may require, as preconditions to disbursement, that the borrower have specified amounts of working capital (including amounts derived from Federal financial assistance) and maintain specified financial ratios, where in the Secretary's judgment satisfaction of such preconditions is necessary to assure the borrower's ability to make and perform the contract, agreement or subcontract according to the bid or proposal, or is otherwise necessary to protect the interests of the United States.

(d) The Secretary may require pledges, personal guarantees and other collateral security, and the maintenance of insurance on the borrower's assets and principals, in amounts and on terms appropriate in the Secretary's judgment, to protect the interests of the United States.

§ 800.203 Loan limits.

The Secretary shall not make a loan in excess of $50,000, or make aggregate loans to the same minority business enterprise, including its affiliates, in any Federal fiscal year in excess of $100,000. In addition, the Secretary shall not increase a loan to an amount which would cause the limits set forth in the previous sentence to be exceeded. Nothing in this regulation shall be interpreted to restrict the Secretary, in making the various determinations provided for in this regulation, from taking into account considerations relating to the Office of Minority Economic Impact loan program as a whole.

§ 800.204 Deviations.

(a) To the extent consistent with the Act, relevant appropriations acts, and other applicable statutes, DOE may deviate on an individual application basis from the requirements of this regulation upon a finding by the Secretary that such deviation is necessary or appropriate in the individual case for the accomplishment of program objectives.

(b) The contracting officer may, subject to written agreement by other necessary parties, modify or amend the terms and conditions of a loan provided that such modification or amendment shall be consistent with this regulation.

Subpart D Loan Administration

§ 800.300 Loan servicing.

(a) Servicing of a loan under this regulation may be performed by DOE, by another Federal agency, or by a servicing agent (commercial bank, broker, or other financial institution or entity) having the capability, and legally qualified, to service the loan consistently with the requirements of this regulation, which contracts with DOE to act as servicing agent. In determining the capability of a prospective servicing agent, DOE shall give due consideration to the experience of the agent in providing financial services to minority business enterprises.

(b) If the servicing of the loan is by contract or other agreement, such contract or other agreement shall provide that the loan shall be serviced in accordance with this regulation and with the terms and conditions of the loan, under a standard of performance that a reasonable and prudent lender would require as to its own similar loan. Servicing responsibilities shall include, but not necessarily be limited to, the following:

(1) Loan disbursements as set forth in the loan agreement.

(2) Collection of principal and interest payments on a monthly basis.

(3) Maintenance of records on loan accounts.

(4) Notification of the Secretary, without delay, as to the following:

(i) That the initial disbursement or loan drawdown is ready to be made, together with evidence from the borrower that the bid or proposal preparation has begun or is about to begin.

(ii) The date and amount of each subsequent disbursement under the loan.

(iii) Any nonreceipt of payment within 10 days after the date specified for payment, together with evidence of appropriate notification to the borrower.

(iv) Any known failure by the borrower to comply with the terms and conditions of the loan agreement.

(v) Evidence, if any, that the borrower is likely to default on any condition set forth in the loan agreement or may be unable to make the next scheduled payment of principal or interest.

(5) Submittal to DOE of periodic (semi-annual or annual) reports on the status and conditions of the loan and of the borrower.

§ 800.301 Monitoring.

The Secretary shall have the right to audit any and all costs of the bid or proposal for which the loan is sought or made and to exclude or reduce the includible amount of any cost in accordance with § 800.200. Auditors who are employees of the United States Government, who are designated by the Secretary of Energy or by the Comptroller General of the United States, shall have access to, and the right to examine, any directly pertinent documents and records of an applicant or borrower at reasonable times under reasonable circumstances. The servicing agent, if any, shall make information regarding the loan available to the Secretary of Energy and Comptroller General to the extent lawful and within its ability. The Secretary may direct the applicant or borrower to submit to an audit by public accountant or equivalent acceptable to the Secretary.

§ 800.302 Loan limitation.

The Secretary may limit the loan by written notice to the borrower to those amounts, if any, already disbursed under the loan, if the Secretary has determined that the borower has failed to comply with a material term or condition set forth in the loan agreement.

§ 800.303 Assignment or transfer of loan.

Assignment or transfer of the loan and obligations thereunder may be made only with the prior written consent of the Secretary.

§ 800.304 Default.

(a) In the event that the borrower fails to perform the terms and conditions of the loan, the borrower shall be in default and the Secretary shall have the right, at the Secretary's option, to accelerate the indebtedness and demand full payment of all principal and interest amounts outstanding under the loan.

(b) No failure on the part of the Secretary to make demand at any time shall constitute a waiver of the rights held by the Secretary.

(c) Upon demand by the Secretary, the borrower shall have a period of not more than 30 days from the date of receipt of the Secretary's demand to make payment in full.

(d) In the event that the failure on the part of the borrower to perform the terms and conditions of the loan does not constitute an intentional act, but is brought about as a result of circumstances largely beyond the control of the borrower, or is deemed by, the Secretary to be insubstantial, the Secretary may elect, at the Secretary's option, to defer such performance and/or restructure the repayment required by the loan agreement in any mutually acceptable manner.

(e) Should the borrower fail to pay after demand as provided in paragraph (c) of this section, and no deferral or restructuring is agreed to by the Secretary as provided in paragraph (d) of this section, the Secretary shall undertake collection in accordance with the terms of the loan agreement and the applicable law.

§ 800.305 Disclosure.

Information received from an applicant by DOE may be available to the public subject to the provision of 5 U.S.C. 552, 18 U.S.C. 1905 and 10 CFR part 1004; provided that:

(a) Subject to the requirements of law, information such as trade secrets, commercial and financial information, and other information concerning the minority business enterprise that the enterprise submits to DOE in writing, in an application, or at other times throughout the duration of the loan on a privileged or confidential basis, will not be disclosed without prior notice to submitter in accordance with DOE regulations concerning public disclosure of information. Any submitter asserting that the information is privileged or confidential should appropriately identify and mark such information.

(b) Upon a showing satisfactory to the Secretary that any information or portion thereof obtained under this regulation would, if made public, divulge trade secrets or other proprietary information of the minority business enterprise, the Secretary may not disclose such information.

(c) This section shall not be construed as authority to withhold information from Congress or from any committee of Congress upon request of the Chairman.

§ 800.306 Noninterference with other laws.

Nothing in this regulation shall be construed to modify requirements imposed on the borrower by Federal, State and local government agencies in connection with permits, licenses, or other authorizations to conduct or finance its business.

§ 800.307 Appeals.

Any dispute concerning questions of fact arising under the loan agreement shall be decided in writing by the contracting officer. The borrower may request the contracting officer to reconsider any such decision, which reconsideration shall be promptly undertaken. If not satisfied with the contracting officer's final decision, the borrower, upon receipt of such written decision, may appeal the decision within 60 days in writing to the Chairman, Financial Assistance Appeals Board (FAAB), Department of Energy, Washington, DC 20585. The Board shall proceed in accordance with the Department of Energy's rules and regulations for such purpose. The decision of the Board with respect to such appeals shall be the final decision of the Secretary.

PART 810 ASSISTANCE TO FOREIGN ATOMIC ENERGY ACTIVITIES

Authority: Secs. 57, 127, 128, 129, 161, 222, 232, and 234 AEA, as amended by the Nuclear Nonproliferation Act of 1978, Pub. L. 95-242, 68 Stat. 932, 948, 950, 958, 92 Stat. 126, 136, 137, 138 (42 U.S.C. 2077, 2156, 2157, 2158, 2201, 2272, 2280, 2282), the Intelligence Reform and Terrorism Prevention Act of 2004, Pub. L. 108-458, 118 Stat. 3768, and sec. 3116 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019, Pub. L. 115-232; Sec. 104 of the Energy Reorganization Act of 1974, Pub. L. 93-438; Sec. 301, Department of Energy Organization Act, Pub. L. 95-91; National Nuclear Security Administration Act, Pub. L. 106-65, 50 U.S.C. 2401 et seq., as amended.

Source: 80 FR 9375, Feb. 23, 2015, unless otherwise noted.

§ 810.1 Purpose.

The regulations in this part implement section 57 b.(2) of the Atomic Energy Act, which empowers the Secretary, with the concurrence of the Department of State, and after consultation with the Nuclear Regulatory Commission, the Department of Commerce, and the Department of Defense, to authorize persons to directly or indirectly engage or participate in the development or production of special nuclear material outside the United States. The purpose of the regulations in this part is to:

(a) Identify activities that are generally authorized by the Secretary and thus require no other authorization under this part;

(b) Identify activities that require specific authorization by the Secretary and explain how to request authorization; and

(c) Specify reporting requirements for authorized activities.

(d) Specify civil penalties and enforcement proceedings.

[80 FR 9375, Feb. 23, 2015, as amended at 88 FR 1979, Jan. 12, 2023]

§ 810.2 Scope.

(a) Part 810 (this part) applies to:

(1) All persons subject to the jurisdiction of the United States who directly or indirectly engage or participate in the development or production of any special nuclear material outside the United States; and

(2) The transfer of technology that involves any of the activities listed in paragraph (b) of this section either in the United States or abroad by such persons or by licensees, contractors or subsidiaries under their direction, supervision, responsibility, or control.

(b) The activities referred to in paragraph (a) of this section are:

(1) Chemical conversion and purification of uranium and thorium from milling plant concentrates and in all subsequent steps in the nuclear fuel cycle;

(2) Chemical conversion and purification of plutonium and neptunium;

(3) Nuclear fuel fabrication, including preparation of fuel elements, fuel assemblies and cladding thereof;

(4) Uranium isotope separation (uranium enrichment), plutonium isotope separation, and isotope separation of any other elements (including stable isotope separation) when the technology or process can be applied directly or indirectly to uranium or plutonium;

(5) Nuclear reactor development, production or use of the components within or attached directly to the reactor vessel, the equipment that controls the level of power in the core, and the equipment or components that normally contain or come in direct contact with or control the primary coolant of the reactor core;

(6) Development, production or use of production accelerator-driven subcritical assembly systems;

(7) Heavy water production and hydrogen isotope separation when the technology or process has reasonable potential for large-scale separation of deuterium ( 2H) from protium ( 1H);

(8) Reprocessing of irradiated nuclear fuel or targets containing special nuclear material, and post-irradiation examination of fuel elements, fuel assemblies and cladding thereof, if it is part of a reprocessing program; and

(9) The transfer of technology for the development, production, or use of equipment or material especially designed or prepared for any of the above listed activities. (See Nuclear Regulatory Commission regulations at 10 CFR part 110, Appendices A through K, and O, for an illustrative list of items considered to be especially designed or prepared for certain listed nuclear activities.)

(c) This part does not apply to:

(1) Exports authorized by the Nuclear Regulatory Commission, Department of State, or Department of Commerce;

(2) Transfer of publicly available information, publicly available technology, or the results of fundamental research;

(3) Uranium and thorium mining and milling (e.g., production of impure source material concentrates such as uranium yellowcake and all activities prior to that production step);

(4) Nuclear fusion reactors per se, except for supporting systems involving hydrogen isotope separation technologies within the scope defined in paragraph (b)(7) of this section and § 810.7(c)(3);

(5) Production or extraction of radiopharmaceutical isotopes when the process does not involve special nuclear material; and

(6) Transfer of technology to any individual who is lawfully admitted for permanent residence in the United States or is a protected individual under the Immigration and Naturalization Act (8 U.S.C. 1324b(a)(3)).

(d) Persons under U.S. jurisdiction are responsible for their foreign licensees, contractors, or subsidiaries to the extent that the former have control over the activities of the latter.

§ 810.3 Definitions.

As used in this part 810:

Agreement for cooperation means an agreement with another nation or group of nations concluded under sections 123 or 124 of the Atomic Energy Act.

Assistance means assistance in such forms as instruction, skills, training, working knowledge, consulting services, or any other assistance as determined by the Secretary. Assistance may involve the transfer of technical data.

Atomic Energy Act means the Atomic Energy Act of 1954, as amended.

Classified information means national security information classified under Executive Order 13526 or any predecessor or superseding order, and Restricted Data classified under the Atomic Energy Act.

Cooperative enrichment enterprise means a multi-country or multi-company (where at least two of the companies are incorporated in different countries) joint development or production effort. The term includes a consortium of countries or companies or a multinational corporation.

Country, as well as government, nation, state, and similar entity, shall be read to include Taiwan, consistent with section 4 of the Taiwan Relations Act (22 U.S.C. 3303).

Development means any activity related to all phases before production such as: Design, design research, design analysis, design concepts, assembly and testing of prototypes, pilot production schemes, design data, process of transforming design data into a product, configuration design, integration design, and layouts.

DOE means the U.S. Department of Energy.

Enrichment means isotope separation of uranium or isotope separation of plutonium, regardless of the type of process or separation mechanism used.

Fissile material means isotopes that readily fission after absorbing a neutron of any energy, either fast or slow. Fissile materials are uranium-235, uranium-233, plutonium-239, and plutonium-241.

Foreign national means an individual who is not a citizen or national of the United States, but excludes U.S. lawful permanent residents and protected individuals under the Immigration and Naturalization Act (8 U.S.C. 1324b(a)(3)).

Fundamental research means basic and applied research in science and engineering, the results of which ordinarily are published and shared broadly within the scientific community, as distinguished from proprietary research and from industrial development, design, production, and product utilization, the results of which ordinarily are restricted for proprietary or national security reasons.

General authorization means an authorization granted by the Secretary under section 57 b.(2) of the Atomic Energy Act to provide assistance or technology to foreign atomic energy activities subject to this part and which does not require a request for, or the Secretary's issuance of, a specific authorization.

IAEA means the International Atomic Energy Agency.

NNPA means the Nuclear Non-Proliferation Act of 1978, 22 U.S.C. 3201 et seq.

NPT means the Treaty on the Non-Proliferation of Nuclear Weapons, done on July 1, 1968.

Nuclear reactor means an apparatus, other than a nuclear explosive device, designed or used to sustain nuclear fission in a self-sustaining chain reaction.

Operational safety means the capability of a reactor to be operated in a manner that complies with national standards or requirements or widely-accepted international standards and recommendations to prevent uncontrolled or inadvertent criticality, prevent or mitigate uncontrolled release of radioactivity to the environment, monitor and limit staff exposure to radiation and radioactivity, and protect off-site population from exposure to radiation or radioactivity. Operational safety may be enhanced by providing expert advice, equipment, instrumentation, technology, software, services, analyses, procedures, training, or other assistance that improves the capability of the reactor to be operated in compliance with such standards, requirements or recommendations.

Person means:

(1) Any individual, corporation, partnership, firm, association, trust, estate, public or private institution;

(2) Any group, government agency other than DOE, or any State or political entity within a State; and

(3) Any legal successor, representative, agent, or agency of the foregoing.

Production means all production phases such as: Construction, production engineering, manufacture, integration, assembly or mounting, inspection, testing, and quality assurance.

Production accelerator means a particle accelerator especially designed, used, or intended for use with a production subcritical assembly.

Production accelerator-driven subcritical assembly system means a system comprised of a production subcritical assembly and a production accelerator and which is especially designed, used, or intended for the production of plutonium or uranium-233. In such a system, the production accelerator target provides a source of neutrons used to effect special nuclear material production in the production subcritical assembly.

Production reactor means a nuclear reactor especially designed or used primarily for the production of plutonium or uranium-233.

Production subcritical assembly means an apparatus that contains source material or special nuclear material to produce a nuclear fission chain reaction that is not self-sustaining and that is especially designed, used, or intended for the production of plutonium or uranium-233.

Publicly available information means information in any form that is generally accessible, without restriction, to the public.

Publicly available technology means technology that is already published or has been prepared for publication; arises during, or results from, fundamental research; or is included in an application filed with the U.S. Patent Office and eligible for foreign filing under 35 U.S.C. 184.

Restricted Data means all data concerning:

(1) Design, manufacture, or utilization of atomic weapons;

(2) The production of special nuclear material; or

(3) The use of special nuclear material in the production of energy, but shall not include data declassified or removed from the Restricted Data category pursuant to section 142 of the Atomic Energy Act.

Secretary means the Secretary of Energy.

Sensitive nuclear technology means any information (including information incorporated in a production or utilization facility or important component part thereof) which is not available to the public (see definition of “publicly available information”) and which is important to the design, construction, fabrication, operation, or maintenance of a uranium enrichment or nuclear fuel reprocessing facility or a facility for the production of heavy water, but shall not include Restricted Data controlled pursuant to chapter 12 of the Atomic Energy Act. The information may take a tangible form such as a model, prototype, blueprint, or operation manual or an intangible form such as assistance.

Source material means:

(1) Uranium or thorium, other than special nuclear material; or

(2) Ores that contain by weight 0.05 percent or more of uranium or thorium, or any combination of these materials.

Special nuclear material means:

(1) Plutonium,

(2) Uranium-233, or

(3) Uranium enriched above 0.711 percent by weight in the isotope uranium-235.

Specific authorization means an authorization granted by the Secretary under section 57b.(2) of the Atomic Energy Act, in response to an application filed under this part, to engage in specifically authorized nuclear activities subject to this part.

Technical data means data in such forms as blueprints, plans, diagrams, models, formulae, engineering designs, specifications, manuals, and instructions written or recorded on other media or devices such as disks, tapes, read-only memories, and computational methodologies, algorithms, and computer codes that can directly or indirectly affect the production of special nuclear material.

Technology means assistance or technical data required for the development, production or use of any plant, facility, or especially designed or prepared equipment for the activities described in § 810.2(b).

Use means operation, installation (including on-site installation), maintenance (checking), repair, overhaul, or refurbishing.

United States, when used in a geographical sense, includes Puerto Rico and all territories and possessions of the United States.

§ 810.4 Communications.

(a) All communications concerning the regulations in this part should be addressed to: U.S. Department of Energy, Washington, DC 20585. Attention: Senior Policy Advisor, National Nuclear Security Administration/Office of Nonproliferation and Arms Control (NPAC), Telephone (202) 586-1007.

(b) Communications also may be delivered to DOE's headquarters at 1000 Independence Avenue SW., Washington, DC 20585. All clearly marked proprietary information will be given the maximum protection allowed by law.

(c) Communications may also be delivered by email to: Part810@nnsa.doe.gov. For “fast track” activities described in §§ 810.6(c)(1) and (c)(2) emails should be sent to: Part810-OperationalSafety@nnsa.doe.gov. Notifications regarding activity in the Ukraine should be delivered by email to: Part810-Ukraine@nnsa.doe.gov.

§ 810.5 Interpretations.

(a) The advice of the DOE Office of Nonproliferation and Arms Control may be requested on whether a proposed activity falls outside the scope of this part, is generally authorized under § 810.6, or requires a specific authorization under § 810.7. However, unless authorized by the Secretary in writing, no interpretation of the regulations in this part other than a written interpretation by the DOE General Counsel is binding upon DOE.

(b) When advice is requested from the DOE Office of Nonproliferation and Arms Control, or a binding, written determination is requested from the DOE General Counsel, a response normally will be made within 30 calendar days and, if this is not feasible, an interim response will explain the reason for the delay.

(c) The DOE Office of Nonproliferation and Arms Control may periodically publish abstracts of general or specific authorizations that may be of general interest, exclusive of proprietary business-confidential data submitted to DOE or other information protected by law from unauthorized disclosure.

§ 810.6 Generally authorized activities.

The Secretary has determined that the following activities are generally authorized, provided that no sensitive nuclear technology or assistance described in § 810.7 is involved:

(a) Engaging directly or indirectly in the production of special nuclear material at facilities in countries or with entities listed in the Appendix to this part;

(b) Transfer of technology to a citizen or national of a country other than the United States not listed in the Appendix to this part and working at an NRC-licensed facility, provided:

(1) The foreign national is lawfully employed by or contracted to work for a U.S. employer in the United States;

(2) The foreign national executes a confidentiality agreement with the U.S. employer to safeguard the technology from unauthorized use or disclosure;

(3) The foreign national has been granted unescorted access in accordance with NRC regulations at an NRC-licensed facility; and

(4) The foreign national's U.S. employer authorizing access to the technology complies with the reporting requirements in § 810.12(g).

(c) Activities at any safeguarded or NRC-licensed facility to:

(1) Prevent or correct a current or imminent radiological emergency posing a significant danger to the health and safety of the off-site population, which emergency in DOE's assessment cannot be met by other means, provided DOE is notified in writing in advance and does not object within 48 hours of receipt of the advance notification;

(2) Furnish operational safety information or assistance to existing safeguarded civilian nuclear reactors outside the United States in countries with safeguards agreements with the IAEA or an equivalent voluntary offer, provided DOE is notified in writing and approves the activity in writing within 45 calendar days of the notice. The applicant should provide all the information required under § 810.11 and specific references to the national or international safety standards or requirements for operational safety for nuclear reactors that will be addressed by the assistance; or

(3) Furnish operational safety information or assistance to existing, proposed, or new-build civilian nuclear facilities in the United States, provided DOE is notified by certified mail return receipt requested and approves the activity in writing within 45 calendar days of the notice. The applicant should provide all the information required under § 810.11.

(d) Participation in exchange programs approved by the Department of State in consultation with DOE;

(e) Activities carried out in the course of implementation of the “Agreement between the United States of America and the IAEA for the Application of Safeguards in the United States,” done on December 9, 1980;

(f) Activities carried out by persons who are full-time employees of the IAEA or whose employment by or work for the IAEA is sponsored or approved by the Department of State or DOE; or

(g) Extraction of Molybdenum-99 for medical use from irradiated targets of enriched uranium, provided that the activity does not also involve purification and recovery of enriched uranium materials, and provided further, that the technology used does not involve significant components relevant for reprocessing spent nuclear reactor fuel (e.g., high-speed centrifugal contactors, pulsed columns).

§ 810.7 Activities requiring specific authorization.

Any person requires a specific authorization by the Secretary before:

(a) Engaging in any of the activities listed in § 810.2(b) with any foreign country or entity not specified in the Appendix to this part;

(b) Providing or transferring sensitive nuclear technology to any foreign country or entity; or

(c) Engaging in or providing technology (including assistance) for any of the following activities with respect to any foreign country or entity (or a citizen or national of that country other than U.S. lawful permanent residents or protected individuals under the Immigration and Naturalization Act (8 U.S.C. 1324b(a)(3)):

(1) Uranium isotope separation (uranium enrichment), plutonium isotope separation, or isotope separation of any other elements (including stable isotope separation) when the technology or process can be applied directly or indirectly to uranium or plutonium;

(2) Fabrication of nuclear fuel containing plutonium, including preparation of fuel elements, fuel assemblies, and cladding thereof;

(3) Heavy water production, and hydrogen isotope separation, when the technology or process has reasonable potential for large-scale separation of deuterium ( 2H) from protium ( 1H);

(4) Development, production or use of a production accelerator-driven subcritical assembly system;

(5) Development, production or use of a production reactor; or

(6) Reprocessing of irradiated nuclear fuel or targets containing special nuclear material.

§ 810.8 Restrictions on general and specific authorization.

A general or specific authorization granted by the Secretary under this part:

(a) Is limited to activities involving only unclassified information and does not permit furnishing classified information;

(b) Does not relieve a person from complying with the relevant laws or the regulations of other U.S. Government agencies applicable to exports; and

(c) Does not authorize a person to engage in any activity when the person knows or has reason to know that the activity is intended to provide assistance in designing, developing, fabricating, or testing a nuclear explosive device.

§ 810.9 Grant of specific authorization.

(a) An application for authorization to engage in activities for which specific authorization is required under § 810.7 should be made to the U.S. Department of Energy, National Nuclear Security Administration, Washington, DC 20585, Attention: Senior Policy Advisor, Office of Nonproliferation and Arms Control (NPAC).

(b) The Secretary will approve an application for specific authorization if it is determined, with the concurrence of the Department of State and after consultation with the Nuclear Regulatory Commission, Department of Commerce, and Department of Defense, that the activity will not be inimical to the interest of the United States. In making such a determination, the Secretary will take into account the following factors:

(1) Whether the United States has an agreement for cooperation in force covering exports to the country or entity involved;

(2) Whether the country is a party to, or has otherwise adhered to, the NPT;

(3) Whether the country is in good standing with its acknowledged nonproliferation commitments;

(4) Whether the country is in full compliance with its obligations under the NPT;

(5) Whether the country has accepted IAEA safeguards obligations on all nuclear materials used for peaceful purposes and has them in force;

(6) Whether other nonproliferation controls or conditions exist on the proposed activity, including that the recipient is duly authorized by the country to receive and use the technology sought to be transferred;

(7) Significance of the assistance or transferred technology relative to the existing nuclear capabilities of the country;

(8) Whether the transferred technology is part of an existing cooperative enrichment enterprise or the supply chain of such an enterprise;

(9) The availability of comparable assistance or technology from other sources; and

(10) Any other factors that may bear upon the political, economic, competitiveness, or security interests of the United States, including the obligations of the United States under treaties or other international agreements, and the obligations of the country under treaties or other international agreements.

(c) If the proposed activity involves the export of sensitive nuclear technology, the requirements of sections 127 and 128 of the Atomic Energy Act and of any applicable United States international commitments must also be met. For the export of sensitive nuclear technology, in addition to the factors in paragraph (b) of this section, the Secretary will take into account:

(1) Whether the country has signed, ratified, and is implementing a comprehensive safeguards agreement with the IAEA and has in force an Additional Protocol based on the Model Additional Protocol, or, pending this, in the case of a regional accounting and control arrangement for nuclear materials, is implementing, in cooperation with the IAEA, a safeguards agreement approved by the IAEA Board of Governors prior to the publication of INFCIRC/540 (September 1997); or alternatively whether comprehensive safeguards, including the measures of the Model Additional Protocol, are being applied in the country;

(2) Whether the country has not been identified in a report by the IAEA Secretariat that is under consideration by the IAEA Board of Governors, as being in breach of obligations to comply with the applicable safeguards agreement, nor continues to be the subject of Board of Governors decisions calling upon it to take additional steps to comply with its safeguards obligations or to build confidence in the peaceful nature of its nuclear program, nor as to which the IAEA Secretariat has reported that it is unable to implement the applicable safeguards agreement. This criterion would not apply in cases where the IAEA Board of Governors or the United Nations Security Council subsequently decides that adequate assurances exist as to the peaceful purposes of the country's nuclear program and its compliance with the applicable safeguards agreements. For the purposes of this paragraph, “breach” refers only to serious breaches of proliferation concern;

(3) Whether the country is adhering to the Nuclear Suppliers Group Guidelines and, where applicable, has reported to the Security Council of the United Nations that it is implementing effective export controls as identified by Security Council Resolution 1540; and

(4) Whether the country adheres to international safety conventions relating to nuclear or other radioactive materials or facilities.

(d) Unless otherwise prohibited by U.S. law, the Secretary may grant an application for specific authorization for activities related to the enrichment of source material and special nuclear material, provided that:

(1) The U.S. Government has received written nonproliferation assurances from the government of the country;

(2) That it/they accept(s) the sensitive enrichment equipment and enabling technologies or an operable enrichment facility under conditions that do not permit or enable unauthorized replication of the facilities;

(3) That the subject enrichment activity will not result in the production of uranium enriched to greater than 20% in the isotope uranium-235; and

(4) That there are in place appropriate security arrangements to protect the activity from use or transfer inconsistent with the country's national laws.

(e) Approximately 30 calendar days after the Secretary's grant of a specific authorization, a copy of the Secretary's determination may be provided to any person requesting it at DOE's Public Reading Room, unless the applicant submits information demonstrating that public disclosure will cause substantial harm to its competitive position. This provision does not affect any other authority provided by law for the non-disclosure of information.

§ 810.10 Revocation, suspension, or modification of authorization.

The Secretary may revoke, suspend, or modify a general or specific authorization:

(a) For any material false statement in an application for specific authorization or in any additional information submitted in its support;

(b) For failing to provide a report or for any material false statement in a report submitted pursuant to § 810.12;

(c) If any authorization governed by this part is subsequently determined by the Secretary to be inimical to the interest of the United States or otherwise no longer meets the legal criteria for approval; or

(d) Pursuant to section 129 of the Atomic Energy Act.

§ 810.11 Information required in an application for specific authorization.

(a) An application letter must include the following information:

(1) The name, address, and citizenship of the applicant, and complete disclosure of all real parties in interest; if the applicant is a corporation or other legal entity, where it is incorporated or organized; the location of its principal office; and the degree of any control or ownership by any foreign individual, corporation, partnership, firm, association, trust, estate, public or private institution or government agency;

(2) The country or entity to receive the assistance or technology; the name and location of any facility or project involved; and the name and address of the person for which or whom the activity is to be performed;

(3) A description of the assistance or technology to be provided, including a complete description of the proposed activity, its approximate monetary value, and a detailed description of any specific project to which the activity relates as specified in §§ 810.9(b)(7), (8), and (9); and

(4) The designation of any information that if publicly disclosed would cause substantial harm to the competitive position of the applicant.

(b) Except as provided in § 810.6(b), an applicant seeking to employ a citizen or national of a country not listed in the Appendix in a position that could result in the transfer of technology subject to § 810.2, or seeking to employ any foreign national in the United States or in a foreign country that could result in the export of assistance or transfer of technology subject to § 810.7 must request a specific authorization. The applicant must provide, with respect to each foreign national to whom access to technology will be granted, the following:

(1) A description of the technology that would be made available to the foreign national;

(2) The purpose of the proposed transfer, a description of the applicant's technology control program, and any Nuclear Regulatory Commission standards applicable to the employer's grant of access to the technology;

(3) A copy of any confidentiality agreement to safeguard the technology from unauthorized use or disclosure between the applicant and the foreign national;

(4) Background information about the foreign national, including the individual's citizenship, all countries where the individual has resided for more than six months, the training or educational background of the individual, all work experience, any other known affiliations with persons engaged in activities subject to this part, and any current immigration or visa status in the United States; and

(5) A statement signed by the foreign national that he/she will comply with the regulations under this part; will not disclose the applicant's technology without DOE's prior written authorization; and will not, at any time during or after his/her employment with the applicant, use the applicant's technology for any nuclear explosive device, for research on or development of any nuclear explosive device, or in furtherance of any military purpose.

(c) An applicant for a specific authorization related to the enrichment of fissile material must submit information that demonstrates that the proposed transfer will avoid, so far as practicable, the transfer of enabling design or manufacturing technology associated with such items; and that the applicant will share with the recipient only information required for the regulatory purposes of the recipient country or to ensure the safe installation and operation of a resulting enrichment facility, without divulging enabling technology.

§ 810.12 Reports.

(a) Each person who has received a specific authorization shall, within 30 calendar days after beginning the authorized activity, provide to DOE a written report containing the following information:

(1) The name, address, and citizenship of the person submitting the report;

(2) The name, address, and citizenship of the person for whom or which the activity is being performed;

(3) A description of the activity, the date it began, its location, status, and anticipated date of completion; and

(4) A copy of the DOE letter authorizing the activity.

(b) Each person carrying out a specifically authorized activity shall inform DOE, in writing within 30 calendar days, of completion of the activity or of its termination before completion.

(c) Each person granted a specific authorization shall inform DOE, in writing within 30 calendar days, when it is known that the proposed activity will not be undertaken and the granted authorization will not be used.

(d) DOE may require reports to include such additional information that may be required by applicable U.S. law, regulation, or policy with respect to the specific nuclear activity or country for which specific authorization is required.

(e) Each person, within 30 calendar days after beginning any generally authorized activity under § 810.6, shall provide to DOE:

(1) The name, address, and citizenship of the person submitting the report;

(2) The name, address, and citizenship of the person for whom or which the activity is being performed;

(3) A description of the activity, the date it began, its location, status, and anticipated date of completion; and

(4) A written assurance that the applicant has an agreement with the recipient ensuring that any subsequent transfer of materials, equipment, or technology transferred under general authorization under circumstances in which the conditions in § 810.6 would not be met will take place only if the applicant obtains DOE's prior written approval.

(f) Individuals engaging in generally authorized activities as employees of persons required to report are not themselves required to submit the reports described in paragraph (e) of this section.

(g) Persons engaging in generally authorized activities under § 810.6(b) are required to notify DOE that a citizen or national of a country not listed in the Appendix to this part has been granted access to information subject to § 810.2 in accordance with Nuclear Regulatory Commission access requirements. The report should contain the information required in § 810.11(b).

(h) All reports should be sent to: U.S. Department of Energy, National Nuclear Security Administration, Washington, DC 20585, Attention: Senior Policy Advisor, Office of Nonproliferation and Arms Control (NPAC).

§ 810.13 Additional information.

DOE may at any time require a person engaging in any generally or specifically authorized activity to submit additional information.

§ 810.14 Special provisions regarding Ukraine.

(a) Pre-activity notification requirements. Any person beginning any generally authorized activity involving Ukraine shall provide to DOE at least ten days prior to beginning that activity a report containing the following information:

(1) The name, address, and citizenship of the person submitting the notification;

(2) The name, address, and citizenship of the person for which the activity is to be performed;

(3) A description of the activity, the date it is proposed to begin, its location, status, and anticipated date of completion; and

(4) A written assurance that the person that is to perform the activity has an agreement with the recipient that any subsequent transfer of technology or information transferred under general authorization will not be transferred to a country that is not listed in the Appendix to this part without the prior written approval of DOE.

(b) Post-activity reporting requirements. Every person completing a generally authorized activity in Ukraine shall provide to DOE within ten days following the original transfer of technology or information written confirmation that such transfer was completed in accordance with the description of the activity provided as required by paragraph (a) of this section.

§ 810.15 Violations.

(a) The Atomic Energy Act provides that:

(1) In accordance with section 232 of the AEA, permanent or temporary injunctions, restraining or other orders may be granted to prevent a violation of any provision of the Atomic Energy Act or any regulation or order issued thereunder.

(2) In accordance with section 222 of the AEA, whoever willfully violates, attempts to violate, or conspires to violate any provision of section 57 of the Atomic Energy Act may be fined up to $10,000 or imprisoned up to 10 years, or both. If the offense is committed with intent to injure the United States or to aid any foreign nation, the penalty could be up to life imprisonment or a $20,000 fine, or both.

(b) In accordance with Title 18 of the United States Code, section 1001, whoever knowingly and willfully falsifies, conceals, or covers up a material fact or makes or uses false, fictitious or fraudulent statements or representations shall be fined under that title or imprisoned up to five or eight years depending on the crime, or both.

(c) In accordance with section 234 of the AEA, any person who violates any provision of section 57 b. of the AEA, as implemented under this part, shall be subject to a civil penalty, not to exceed $127,973 per violation, such amount to be adjusted annually for inflation pursuant to the Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015. If any violation is a continuing one, each day from the point at which the violating activity began to the point at which the violating activity was suspended shall constitute a separate violation for the purpose of computing the applicable civil penalty. The mere act of suspending an activity does not constitute admission that the activity was a violation and does not waive the rights and processes outlined in paragraphs (c)(4) through (14) of this section or otherwise impact the right of the person to appeal any civil penalty that may be imposed.

(1) In order to begin a proceeding to impose a civil penalty under this paragraph (c), the Deputy Administrator for Defense Nuclear Nonproliferation or his/her designee, shall notify the person by a written notice of violation sent by registered or certified mail to the last known address of such person, of:

(i) The date, facts, and nature of each act or omission with which the person is charged;

(ii) The particular provision or provisions of section 57 b. of the AEA, as implemented under this part, involved in each alleged violation;

(iii) The penalty which DOE proposes to impose, including an explanation of how the factors at paragraph (c)(5) of this section were considered;

(iv) The opportunity of the person to submit a written reply within 30 calendar days of receipt of such preliminary notice of violation showing why such penalty should not be imposed; and

(v) The possibility of collection by civil action upon failure to pay the civil penalty.

(2) A reply to the notice of violation must:

(i) State any facts, explanations, and arguments which support a denial of the alleged violation;

(ii) Demonstrate any extenuating circumstances or other reason why a proposed penalty should not be imposed or should be mitigated;

(iii) Discuss the relevant authorities which support the position asserted;

(iv) Furnish full and complete answers to any questions set forth in the notice of violation; and

(v) Include copies of all relevant documents.

(3) If a person fails to submit a written reply within 30 calendar days of receipt of a notice of violation, the notice of violation, including any penalties therein, constitutes a final decision, and payment of the full amount of the civil penalty assessed in the notice of violation is due 30 calendar days after receipt of the notice of violation. Such failure to submit a reply constitutes a waiver of the rights and processes outlined in paragraphs (c)(4) through (14) of this section.

(4) The Deputy Administrator for Defense Nuclear Nonproliferation or his/her designee, at the written request of a person notified of an alleged violation, may extend in writing, for a reasonable period, the time for submitting a reply.

(5) If a person submits a timely written reply to the notice of violation, the Deputy Administrator for Defense Nuclear Nonproliferation will make a final determination whether the person violated or is continuing to violate a requirement of section 57 b. of the AEA, as implemented under this part. Based on a determination that a person has violated or is continuing to violate a requirement of section 57 b., as implemented under this part, the Deputy Administrator for Defense Nuclear Nonproliferation will issue to that person a final notice of violation that concisely states the violation, the amount of the civil penalty imposed, including an explanation of how the factors in this paragraph were considered, further actions necessary by or available to the person, and that upon failure to timely pay the civil penalty, the penalty may be collected by civil action. The Deputy Administrator for Defense Nuclear Nonproliferation will send such a final notice of violation by registered or certified mail to the last known address of the person. The amount of the civil penalty will be based on:

(i) The nature, circumstances, extent, and gravity of the violation or violations;

(ii) The violator's ability to pay;

(iii) The effect of the civil penalty on the person's ability to do business;

(iv) Any history of prior violations;

(v) The degree of culpability;

(vi) Whether the violator self-disclosed the violation;

(vii) The economic significance of the violation; and (viii) Such other factors as justice may require.

(6) Any person who receives a final notice of violation under paragraph (c)(5) of this section may request a hearing concerning the allegations contained in the notice. The person must mail or deliver any written request for a hearing to the Under Secretary for Nuclear Security within 30 calendar days of receipt of the final notice of violation. If the person does not request a hearing within 30 calendar days, the final notice of violation, including any penalties therein, constitutes a final decision, and payment of the full amount of the civil penalty assessed in the final notice of violation is due 45 calendar days after receipt of the final notice of violation.

(7) Upon receipt from a person of a written request for a hearing, the Under Secretary for Nuclear Security or his/her designee, shall:

(i) Appoint a Hearing Counsel; and

(ii) Forward the request to the DOE Office of Hearings and Appeals (OHA). The OHA Director shall appoint an OHA Administrative Judge to preside at the hearing.

(8) The Hearing Counsel shall be an attorney employed by DOE, and shall have all powers necessary to represent DOE before the OHA.

(9) In all hearings under this paragraph (c):

(i) The parties have the right to be represented by a person of their choosing, subject to possessing an appropriate information access authorization for the subject matter. The parties are responsible for producing witnesses on their behalf, including requesting the issuance of subpoenas, if necessary;

(ii) Testimony of witnesses is given under oath or affirmation, and witnesses must be advised of the applicability of 18 U.S.C. 1001 and 18 U.S.C. 1621, dealing with the criminal penalties associated with false statements and perjury;

(iii) Witnesses are subject to cross-examination;

(iv) Formal rules of evidence do not apply, but OHA may use the Federal Rules of Evidence as a guide; and

(v) A court reporter will make a transcript of the hearing.

(vi) The Administrative Judge has all powers necessary to regulate the conduct of proceedings:

(vii) The Administrative Judge may order discovery at the request of a party, based on a showing that the requested discovery is designed to produce evidence regarding a matter, not privileged, that is relevant to the subject matter of the complaint;

(viii) The Administrative Judge may permit parties to obtain discovery by any appropriate method, including deposition upon oral examination or written questions; written interrogatories; production of documents or things; permission to enter upon land or other property for inspection and other purposes; and requests for admission;

(ix) The Administrative Judge may issue subpoenas for the appearance of witnesses on behalf of either party, or for the production of specific documents or other physical evidence;

(x) The Administrative Judge may rule on objections to the presentation of evidence; exclude evidence that is immaterial, irrelevant, or unduly repetitious; require the advance submission of documents offered as evidence; dispose of procedural requests; grant extensions of time; determine the format of the hearing; direct that written motions, documents, or briefs be filed with respect to issues raised during the course of the hearing; ask questions of witnesses; direct that documentary evidence be served upon other parties (under protective order if such evidence is deemed confidential); and otherwise regulate the conduct of the hearing;

(xi) The Administrative Judge may, at the request of a party or on his or her own initiative, dismiss a claim, defense, or party and make adverse findings upon the failure of a party or the party's representative to comply with a lawful order of the Administrative Judge, or, without good cause, to attend a hearing;

(xii) The Administrative Judge, upon request of a party, may allow the parties a reasonable time to file pre-hearing briefs or written statements with respect to material issues of fact or law. Any pre-hearing submission must be limited to the issues specified and filed within the time prescribed by the Administrative Judge;

(xiii) The parties are entitled to make oral closing arguments, but post-hearing submissions are only permitted by direction of the Administrative Judge;

(xiv) Parties allowed to file written submissions, or documentary evidence must serve copies upon the other parties within the timeframe prescribed by the Administrative Judge;

(xv) The Administrative Judge is prohibited, beginning with his or her appointment and until a final agency decision is issued, from initiating or otherwise engaging in ex parte (private) discussions with any party on the merits of the complaint;

(xvi) The Administrative Judge is responsible for determining the date, time, and location of the hearing, including whether the hearing will be conducted via video conference; and

(xvii) The Administrative Judge shall convene the hearing within 180 days of the OHA's receipt of the request for a hearing, unless the parties agree to an extension of this deadline by mutual written consent, or the Administrative Judge determines that extraordinary circumstances exist that require a delay.

(10) Hearings shall be open only to Hearing Counsel, duly authorized representatives of DOE, the person and the person's counsel or other representatives, and such other persons as may be authorized by the Administrative Judge. Unless otherwise ordered by the Administrative Judge, witnesses shall testify in the presence of the person but not in the presence of other witnesses.

(11) The Administrative Judge must use procedures appropriate to safeguard and prevent unauthorized disclosure of classified information or any other information protected from public disclosure by law or regulation, with minimum impairment of rights and obligations under this part. The classified or otherwise protected status of any information shall not, however, preclude its being introduced into evidence. The Administrative Judge may issue such orders as may be necessary to consider such evidence in camera including the preparation of a supplemental recommended decision to address issues of law or fact that arise out of that portion of the evidence that is classified or otherwise protected.

(12) DOE shall have the burden of proving the violation(s) as set forth in the final notice of violation by a preponderance of the evidence. The person to whom the notice of violation is addressed shall have the burden of proving any affirmative defense by a preponderance of the evidence. The amount of the penalty associated with any violation which is upheld shall be adopted by the Administrative Judge unless not supported by the facts, in which event the Administrative Judge will include such information in the Administrative Judge's recommended decisions to the Under Secretary for reconsideration of the amount of the penalty based on the Administrate Judge's resolution of the factual issues.

(13) Within 180 days of receiving a copy of the hearing transcript, or the closing of the record, whichever is later, the Administrative Judge shall issue a recommended decision. The recommended decision shall contain findings of fact and conclusions regarding all material issues of law, as well as the reasons therefor. If the Administrative Judge determines that a violation has occurred and that a civil penalty is appropriate, the recommended decision shall set forth the amount of the civil penalty based on the factors in paragraph (c)(5) of this section.

(14) The Administrative Judge shall forward the recommended decision to the Under Secretary for Nuclear Security. The Under Secretary for Nuclear Security shall make a final decision as soon as practicable after completing his/her review. This may include compromising, mitigating, or remitting the penalties in accordance with section 234 a. of the AEA, as amended. DOE shall notify the person of the Under Secretary for Nuclear Security's final decision or other action under this paragraph in writing by certified mail, return receipt requested. The person against whom the civil penalty is assessed by the final decision shall pay the full amount of the civil penalty assessed in the final decision within 30 calendar days unless otherwise determined by the Under Secretary for Nuclear Security.

(15) If a civil penalty assessed in a final decision is not paid as provided in paragraphs(c)(3), (6), or (14) of this section, as appropriate, the Under Secretary for Nuclear Security may request the Department of Justice to initiate a civil action to collect the penalty imposed under this paragraph in accordance with section 234 c. of the AEA.

(16) The Under Secretary for Nuclear Security or his/her designee may publish redacted versions of notices of violation and final decisions.

[80 FR 9375, Feb. 23, 2015, as amended at 88 FR 1979, Jan. 12, 2023; 89 FR 1028, Jan. 9, 2024; 89 FR 105406, Dec. 27, 2024]

§ 810.16 Effective date and savings clause.

(a) The regulations in this part are effective March 25, 2015.

(b) Except for actions that may be taken by DOE pursuant to § 810.10, the regulations in this part do not affect the validity or terms of any specific authorizations granted under regulations in effect before March 25, 2015 or generally authorized activities under those regulations for which the contracts, purchase orders, or licensing arrangements were already in effect. Persons engaging in activities that were generally authorized under regulations in effect before March 25, 2015, but that require specific authorization under the regulations in this part, must request specific authorization by August 24, 2015 and may continue their activities until DOE acts on the request.

Appendix A to Part 810 Generally Authorized Destinations

Argentina

Australia

Austria

Belgium

Brazil

Bulgaria

Canada

Chile (For all activities related to INFCIRC/834 only)

Croatia

Cyprus

Czech Republic

Denmark

Estonia

Finland

France

Germany

Greece

Hungary

Indonesia

International Atomic Energy Agency

Ireland

Italy

Japan

Kazakhstan

Korea, Republic of

Latvia

Lithuania

Luxembourg

Malta

Mexico

Morocco

Netherlands

Norway

The Philippines

Poland

Portugal

Romania

Singapore

Slovakia

Slovenia

South Africa

Spain

Sweden

Switzerland

Taiwan

Thailand

Turkey

Ukraine (Refer to § 810.14 for specific information and requirements)

United Arab Emirates

United Kingdom

Vietnam

[80 FR 9375, Feb. 23, 2015, as amended at 88 FR 8219, Feb. 8, 2023; 90 FR 52849, Nov. 24, 2025; 91 FR 36073, June 16, 2026]

PART 820 PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES

Authority: 42 U.S.C. 2201; 2282(a); 7191; 28 U.S.C. 2461 note; 50 U.S.C. 2410.

Source: 58 FR 43692, Aug. 17, 1993, unless otherwise noted.

Subpart A General

§ 820.1 Purpose and scope.

(a) Scope. This part sets forth the procedures to govern the conduct of persons involved in DOE nuclear activities and, in particular, to achieve compliance with the DOE Nuclear Safety Requirements by all persons subject to those requirements.

(b) Questions not addressed by these rules. Questions that are not addressed in this part shall be resolved at the discretion of the DOE Official.

(c) Exclusion. Activities and facilities covered under E.O. 12344, 42 U.S.C. 7158 note, pertaining to Naval nuclear propulsion are excluded from the requirements of subparts D and E of this part regarding interpretations and exemptions related to this part. The Deputy Administrator for Naval Reactors or his designee will be responsible for formulating, issuing, and maintaining appropriate records of interpretations and exemptions for these facilities and activities.

[58 FR 43692, Aug. 17, 1993, as amended at 71 FR 68732, Nov. 28, 2006]

§ 820.2 Definitions.

(a) The following definitions apply to this part:

Act or AEA means the Atomic Energy Act of 1954, as amended.

Administrative Law Judge means an Administrative Law Judge appointed under 5 U.S.C. 3105.

Consent Agreement means any written document, signed by the Director and a person, containing stipulations or conclusions of fact or law and a remedy acceptable to both the Director and the person.

Contractor means any person under contract (or its subcontractors or suppliers) with the Department of Energy with the responsibility to perform activities or to supply services or products that are subject to DOE Nuclear Safety Requirements.

Department means the United States Department of Energy or any predecessor agency.

Director means the DOE Official to whom the Secretary has assigned the authority to issue Notices of Violation under subpart B of this part, including the Director of Enforcement, or his designee. With regard to activities and facilities covered under E.O. 12344, 42 U.S.C. 7158 note, pertaining to Naval nuclear propulsion, the Director shall mean the Deputy Administrator for Naval Reactors or his designee.

Docketing Clerk means the Office in DOE with which documents for an enforcement action must be filed and which is responsible for maintaining a record and a public docket for enforcement actions commencing with the filing of a Preliminary Notice of Violation. It is also the Office with which interpretations, exemptions, and any other documents designated by the Secretary shall be filed.

DOE means the United States Department of Energy or any predecessor agency.

DOE Nuclear Safety Requirements means the set of rules, regulations, orders, and other requirements relating to nuclear safety adopted by DOE to govern the conduct of persons in connection with any DOE nuclear activity and includes any program, plan, or other provision required to implement these rules, regulations, orders, or other requirements. DOE Nuclear Safety Requirements include the following:

(i) 10 CFR part 830;

(ii) 10 CFR part 835;

(iii) 10 CFR 820.11;

(iv) Compliance Orders issued pursuant to 10 CFR part 820, subpart C; and

(v) 10 CFR 708.43, to the extent that subject activities concern nuclear safety.

DOE Official means the person, or his designee, in charge of making a decision under this part.

Enforcement adjudication means the portion of the enforcement process that commences when a respondent requests an on-the-record adjudication of the assessment of a civil penalty and terminates when a Presiding Officer files an initial decision.

Exemption means the final order that sets forth the relief, waiver, or release, either temporary or permanent, from a DOE Nuclear Safety Requirement, as granted by the appropriate Secretarial Officer pursuant to the provisions of subpart E of this part.

Filing means, except as otherwise specifically indicated, the completion of providing a document to the Office of the Docketing Clerk and serving the document on the person to whom the document is addressed.

Final Notice of Violation means a document issued by the Director in which the Director determines that the respondent has violated or is continuing to violate a DOE Nuclear Safety Requirement and includes:

(i) A statement specifying the DOE Nuclear Safety Requirement to which the violation relates;

(ii) A concise statement of the basis for the determination;

(iii) Any remedy, including the amount of any civil penalty;

(iv) A statement explaining the reasoning behind any remedy; and

(v) If the Notice assesses a civil penalty, notice of respondent's right:

(A) To waive further proceedings and pay the civil penalty;

(B) To request an on-the-record adjudication of the assessment of the civil penalty; or

(C) To seek judicial review of the assessment of the civil penalty.

Final Order means an order of the Secretary that represents final agency action and, where appropriate, imposes a remedy with which the recipient of the order must comply.

General Counsel means the General Counsel of DOE or his designee.

Hearing means an on-the-record enforcement adjudication open to the public and conducted under the procedures set forth in subpart B of this part.

Initial Decision means the decision filed by the Presiding Officer based upon the record of the enforcement adjudication out of which it arises.

Interpretation means a statement by the General Counsel concerning the meaning or effect of the Act, a Nuclear Statute, or a DOE Nuclear Safety Requirement which relates to a specific factual situation but may also be a ruling of general applicability where the General Counsel determines such action to be appropriate.

NNSA means the National Nuclear Security Administration.

Nuclear Statute means any statute or provision of a statute that relates to a DOE nuclear activity and for which DOE is responsible.

Party means the Director and the respondent in an enforcement adjudication under this part.

Person means any individual, corporation, partnership, firm, association, trust, estate, public or private institution, group, Government agency, any State or political subdivision of, or any political entity within a State, any foreign government or nation or any political subdivision of any such government or nation, or other entity and any legal successor, representative, agent or agency of the foregoing; provided that person does not include the Department or the United States Nuclear Regulatory Commission. For purposes of civil penalty assessment, the term also includes affiliated entities, such as a parent corporation.

Preliminary Notice of Violation means a document issued by the Director in which the Director sets forth the preliminary conclusions that the respondent has violated or is continuing to violate a DOE Nuclear Safety Requirement and includes:

(i) A statement specifying the DOE Nuclear Safety Requirement to which the violation relates;

(ii) A concise statement of the basis for alleging the violation;

(iii) Any proposed remedy, including the amount of any proposed civil penalty; and

(iv) A statement explaining the reasoning behind any proposed remedy.

Presiding Officer means the Administrative Law Judge designated to be in charge of an enforcement adjudication who shall conduct a fair and impartial hearing, assure that the facts are fully elicited, adjudicate all issues, avoid delay, and shall have authority to:

(i) Conduct an adjudicatory hearing under this part;

(ii) Rule upon motions, requests, and offers of proof, dispose of procedural requests, and issue all necessary orders;

(iii) Exercise the authority set forth in § 820.8;

(iv) Admit or exclude evidence;

(v) Hear and decide questions of fact, law, or discretion, except for the validity of regulations and interpretations issued by DOE;

(vi) Require parties to attend conferences for the settlement or simplification of the issues, or the expedition of the proceedings;

(vii) Draw adverse inferences against a party that fails to comply with his orders;

(viii) Do all other acts and take all measures necessary for the maintenance of order and for the efficient, fair and impartial adjudication of issues arising in proceedings governed by these rules.

Remedy means any action necessary or appropriate to rectify, prevent, or penalize a violation of the Act, a Nuclear Statute, or a DOE Nuclear Safety Requirements, including the assessment of civil penalties, the requirement of specific actions, or the modification, suspension or recision of a contract.

Respondent means any person to whom the Director addresses a Notice of Violation.

Secretarial Officer means an individual who is appointed to a position in the Department by the President of the United States with the advice and consent of the Senate or the head of a departmental element who is primarily responsible for the conduct of an activity under the Act. With regard to activities and facilities covered under E.O. 12344, 42 U.S.C. 7158 note, pertaining to Naval nuclear propulsion, Secretarial Officer means the Deputy Administrator for Naval Reactors.

Secretary means the Secretary of Energy or his designee.

(b) Terms defined in the Act and not defined in these rules are used consistent with the meanings given in the Act.

(c) As used in this part, words in the singular also include the plural and words in the masculine gender also include the feminine and vice versa, as the case may require.

[58 FR 43692, Aug. 17, 1993, as amended at 71 FR 68732, Nov. 28, 2006; 72 FR 31921, June 8, 2007; 81 FR 94913, Dec. 27, 2016]

§ 820.3 Separation of functions.

(a) Separation of functions. After a respondent requests an on-the-record adjudication of an assessment of a civil penalty contained in a Final Notice of Violation, no person shall participate in a decision-making function in an enforcement proceeding if he has been, is or will be responsible for an investigative or prosecutorial function related to that proceeding or if he reports to the person responsible for the investigative or prosecutorial function.

(b) Director. The Director shall be responsible for the investigation and prosecution of violations of the DOE Nuclear Safety Requirements. After the request for an enforcement adjudication, the Director shall not discuss ex parte the merits of the proceeding with a DOE Official or any person likely to advise the DOE Official in the decision of the proceeding.

(c) Presiding Officer. A Presiding Officer shall perform no duties inconsistent with his responsibilities as a Presiding Officer, and will not be responsible to or subject to the supervision or direction of any officer or employee engaged in the performance of an investigative or prosecutorial function. The Presiding Officer may not consult any person other than a member of his staff or a special assistant on any fact at issue unless on notice and opportunity for all parties to participate, except as required for the disposition of ex parte matters as authorized by law.

§ 820.4 Conflict of interest.

A DOE Official may not perform functions provided for in this part regarding any matter in which he has a financial interest or has any relationship that would make it inappropriate for him to act. A DOE Official shall withdraw at any time from any action in which he deems himself disqualified or unable to act for any reason. Any interested person may at any time request the General Counsel to disqualify a DOE Official or request that the General Counsel disqualify himself. In the case of an enforcement adjudication, a motion to disqualify shall be made to the Presiding Officer. The request shall be supported by affidavits setting forth the grounds for disqualification of the DOE Official. A decision shall be made as soon as practicable and information may be requested from any person concerning the matter. If a DOE Official is disqualified or withdraws from the proceeding, a qualified individual who has none of the infirmities listed in this section shall replace him.

§ 820.5 Service.

(a) General rule. Any document filed with the Docketing Clerk must be served on the addressee of the document and shall not be considered filed until service is complete and unless accompanied by proof of service; provided that the filing with the Docketing Clerk of any document addressed to the DOE Official shall be considered service on the DOE Official.

(b) Service in an Enforcement Adjudication. Any document filed in an enforcement adjudication must be served on all other participants in the adjudication.

(c) Who may be served. Any paper required to be served upon a person shall be served upon him or upon the representative designated by him or by law to receive service of papers. When an attorney has entered an appearance on behalf of a person, service must be made upon the attorney of record.

(d) How service may be made. Service may be made by personal delivery, by first class, certified or registered mail or as otherwise authorized or required by the DOE Official. The DOE Official may require service by express mail.

(e) When service is complete. Service upon a person is complete:

(1) By personal delivery, on handing the paper to the individual, or leaving it at his office with his clerk or other person in charge or, if there is no one in charge, leaving it in a conspicuous place therein or, if the office is closed or the person to be served has no office, leaving it at his usual place of residence with some person of suitable age and discretion then residing there;

(2) By mail, on deposit in the United States mail, properly stamped and addressed; or

(3) By any other means authorized or required by the DOE Official.

(f) Proof of service. Proof of service, stating the name and address of the person on whom served and the manner and date of service, shall be shown for each document filed, and may be made by:

(1) Written acknowledgement of the person served or his counsel;

(2) The certificate of counsel if he has made the service;

(3) The affidavit of the person making the service; or

(4) Any other means authorized or required by the DOE Official.

(g) Deemed service. If a document is deemed filed under this part, then the service requirements shall be deemed satisfied when the document is deemed filed.

§ 820.6 Computation and extension of time.

(a) Computation. In computing any period of time set forth in this part, except as otherwise provided, the day of the event from which the designated period begins to run shall not be included. Saturdays, Sundays, and Federal legal holidays shall be included. When a stated time expires on a Saturday, Sunday or Federal legal holiday, the stated time period shall be extended to include the next business day.

(b) Extensions of time. A DOE Official may grant an extension of any time period set forth in this part.

(c) Service by mail. Where a pleading or document is served by mail, five (5) days shall be added to the time allowed by these rules for the filing of a responsive pleading or document. Where a pleading or document is served by express mail, only two (2) days shall be added.

§ 820.7 Questions of policy or law.

(a) Certification. There shall be no interlocutory appeal from any ruling order, or action decision of a DOE Official except as permitted by this section. A Presiding Officer in an enforcement adjudication may certify, in his discretion, a question to the Secretary, when the order or ruling involves an important question of law or policy concerning which there is substantial grounds for difference of opinion, and either an immediate decision will materially advance the ultimate termination of the proceeding, or subsequent review will be inadequate or ineffective.

(b) Decision. The certified question shall be decided as soon as practicable. If the Secretary determines that the question was improvidently certified, or if he takes no action within thirty days of the certification, the certification is dismissed. The Secretary may decide the question on the basis of the submission made by the Presiding Officer or may request further information from any person.

§ 820.8 Evidentiary matters.

(a) General. A DOE Official may obtain information or evidence for the full and complete investigation of any matter related to a DOE nuclear activity or for any decision required by this part. A DOE Official may sign, issue and serve subpoenas; administer oaths and affirmations; take sworn testimony; compel attendance of and sequester witnesses; control dissemination of any record of testimony taken pursuant to this section; subpoena and reproduce books, papers, correspondence, memoranda, contracts, agreements, or other relevant records or tangible evidence including, but not limited to, information retained in computerized or other automated systems in possession of the subpoenaed person.

(b) Special Report Orders. A DOE Official may issue a Special Report Order (SRO) requiring any person involved in a DOE nuclear activity or otherwise subject to the jurisdiction of DOE to file a special report providing information relating to a DOE Nuclear Safety Requirement, the Act, or a Nuclear Statute, including but not limited to written answers to specific questions. The SRO may be in addition to any other reports required by this part.

(c) Extension of Time. The DOE Official who issues a subpoena or SRO pursuant to this section, for good cause shown, may extend the time prescribed for compliance with the subpoena or SRO and negotiate and approve the terms of satisfactory compliance.

(d) Reconsideration. Prior to the time specified for compliance, but in no event more than 10 days after the date of service of the subpoena or SRO, the person upon whom the document was served may request reconsideration of the subpoena or SRO with the DOE Official who issued the document. If the subpoena or SRO is not modified or rescinded within 10 days of the date of the filing of the request, the subpoena or SRO shall be effective as issued and the person upon whom the document was served shall comply with the subpoena or SRO within 20 days of the date of the filing. There is no administrative appeal of a subpoena or SRO.

(e) Service. A subpoena or SRO shall be served in the manner set forth in § 820.5, except that service by mail must be made by registered or certified mail.

(f) Fees. (1) A witness subpoenaed by a DOE Official shall be paid the same fees and mileage as paid to a witness in the district courts of the United States.

(2) If a subpoena is issued at the request of a person other than an officer or agency of the United States, the witness fees and mileage shall be paid by the person who requested the subpoena. However, at the request of the person, the witness fees and mileage shall be paid by the DOE if the person shows:

(i) The presence of the subpoenaed witness will materially advance the proceeding; and

(ii) The person who requested that the subpoena be issued would suffer a serious hardship if required to pay the witness fees and mileage. The DOE Official issuing the subpoena shall make the determination required by this subsection.

(g) Enforcement. If any person upon whom a subpoena or SRO is served pursuant to this section, refuses or fails to comply with any provision of the subpoena or SRO, an action may be commenced in the United States District Court to enforce the subpoena or SRO.

(h) Certification. (1) Documents produced in response to a subpoena shall be accompanied by the sworn certification, under penalty of perjury, of the person to whom the subpoena was directed or his authorized agent that a diligent search has been made for each document responsive to the subpoena, and to the best of his knowledge, information, and belief all such documents responsive to the subpoena are being produced unless withheld on the grounds of privilege pursuant to paragraph (i) of this section.

(2) Any information furnished in response to an SRO shall be accompanied by the sworn certification under penalty of perjury of the person to whom it was directed or his authorized agent who actually provides the information that to the best of his knowledge, information and belief a diligent effort has been made to provide all information required by the SRO, and all information furnished is true, complete, and correct unless withheld on grounds of privilege pursuant to paragraph (i) of this section.

(3) If any document responsive to a subpoena is not produced or any information required by an SRO is not furnished, the certification shall include a statement setting forth every reason for failing to comply with the subpoena or SRO.

(i) Withheld information. If a person to whom a subpoena or SRO is directed withholds any document or information because of a claim of attorney-client or other privilege, the person submitting the certification required by paragraph (h) of this section also shall submit a written list of the documents or the information withheld indicating a description of each document or information, the date of the document, each person shown on the document as having received a copy of the document, each person shown on the document as having prepared or been sent the document, the privilege relied upon as the basis for withholding the document or information, a memorandum of law supporting the claim of privilege, and an identification of the person whose privilege is being asserted.

(j) Statements/testimony. (1) If a person's statement/testimony is taken pursuant to a subpoena, the DOE Official shall determine whether the statement/testimony shall be recorded and the means by which it is recorded.

(2) A person whose statement/testimony is recorded may procure a copy of the transcript by making a written request for a copy and paying the appropriate fees. Upon proper identification, any potential witness or his attorney has the right to inspect the official transcript of the witness' own statement or testimony.

(k) Sequestration. The DOE Official may sequester any person who furnishes documents or gives testimony. Unless permitted by the DOE Official, neither a witness nor his attorney shall be present during the examination of any other witnesses.

(l) Attorney. (1) Any person whose statement or testimony is taken may be accompanied, represented and advised by his attorney; provided that, if the witness claims a privilege to refuse to answer a question on the grounds of self-incrimination, the witness must assert the privilege personally.

(2) The DOE Official shall take all necessary action to regulate the course of testimony and to avoid delay and prevent or restrain contemptuous or obstructionist conduct or contemptuous language. The DOE Official may take actions as the circumstances may warrant in regard to any instances where any attorney refuses to comply with directions or provisions of this section.

§ 820.9 Special assistant.

A DOE Official may appoint a person to serve as a special assistant to assist the DOE Official in the conduct of any proceeding under this part. Such appointment may occur at any appropriate time. A special assistant shall be subject to the disqualification provisions in § 820.5. A special assistant may perform those duties assigned by the DOE Official, including but not limited to, serving as technical interrogators, technical advisors and special master.

§ 820.10 Office of the docketing clerk.

(a) Docket. The Docketing Clerk shall maintain a docket for enforcement actions commencing with the issuance of a Preliminary Notice of Violation, interpretations issued pursuant to subpart D of this part, exemptions issued pursuant to subpart E of this part, and any other matters designated by the Secretary. A docket for an enforcement action shall contain all documents required to be filed in the proceeding.

(b) Public inspection. Subject to the provisions of law restricting the public disclosure of certain information, any person may, during Department business hours, inspect and copy any document filed with the Docketing Clerk. The cost of duplicating documents shall be borne by the person seeking copies of such documents. The DOE Official may waive this cost in appropriate cases.

(c) Transcript. Except as otherwise provided in this part, after the filing of a Preliminary Notice of Violation, all hearings, conferences, and other meetings in the enforcement process shall be transcribed verbatim. A copy of the transcript shall be filed with the Docketing Clerk promptly. The Docketing Clerk shall serve all participants with notice of the availability of the transcript and shall furnish the participants with a copy of the transcript upon payment of the cost of reproduction, unless a participant can show that the cost is unduly burdensome.

§ 820.11 Information requirements.

(a) Any information pertaining to a nuclear activity provided to DOE by any person or maintained by any person for inspection by DOE shall be complete and accurate in all material respects.

(b) No person involved in a DOE nuclear activity shall conceal or destroy any information concerning a violation of a DOE Nuclear Safety Requirement, a Nuclear Statute, or the Act.

§ 820.12 Classified, confidential, and controlled information.

(a) General rule. The DOE Official in charge of a proceeding under this part may utilize any procedures deemed appropriate to safeguard and prevent disclosure of classified, confidential, and controlled information, including Restricted Data and National Security Information, to unauthorized persons, with minimum impairment of rights and obligations under this part.

(b) Obligation to protect restricted information. Nothing in this part shall relieve any person from safeguarding classified, confidential, and controlled information, including Restricted Data or National Security Information, in accordance with the applicable provisions of federal statutes and the rules, regulations, and orders of any federal agency.

§ 820.13 Direction to NNSA contractors.

(a) Notwithstanding any other provision of this part, and pursuant to section 3213 of Pub. L. 106-65, as amended (codified at 50 U.S.C. 2403), the NNSA, rather than the Director, signs, issues and serves the following actions that direct NNSA contractors:

(1) Subpoenas;

(2) Orders to compel attendance;

(3) Disclosures of information or documents obtained during an investigation or inspection;

(4) Preliminary notices of violations; and

(5) Final notices of violations.

(b) The NNSA Administrator shall act after consideration of the Director's recommendation.

[72 FR 31921, June 8, 2007]

§ 820.14 Whistleblower protection.

(a) Covered acts. An act of retaliation (as defined in 10 CFR 708.2) by a DOE contractor, prohibited by 10 CFR 708.43, that results from a DOE contractor employee's involvement in an activity listed in 10 CFR 708.5(a) through (c) may constitute a violation of a DOE Nuclear Safety Requirement if it concerns nuclear safety.

(b) Commencement of investigation. The Director may not initiate an investigation or take any other action under this part with respect to an alleged act of retaliation by a DOE contractor until 180 days after an alleged violation of 10 CFR 708.43 occurs.

(c) Administrative or judicial proceedings. The Director shall immediately suspend any ongoing activities under this part and suspend any time limits under this part when an administrative or judicial proceeding commences based on the same alleged act of retaliation. While an administrative or judicial proceeding, including appeals, is pending, the Director may not exercise any authority under this part based on an alleged violation of 10 CFR 708.43, including issuing enforcement letters, subpoenas, orders to compel attendance, Consent Orders, Preliminary Notices of Violation, or Final Notices of Violation. Once such a proceeding commences, the Director shall not conduct any activities under this part until sixty days after a final decision of an agency or court finds that a retaliation occurred, or otherwise makes a final disposition of the matter on procedural grounds without explicitly finding that retaliation did not occur.

(d) Final decision. For the purposes of this section, a final decision of an agency or court includes any of the following:

(1) A final agency decision pursuant to 10 CFR part 708;

(2) A final decision or order of the Secretary of Labor pursuant to 29 CFR part 24;

(3) A decision by the Secretary upon a report by the Inspector General;

(4) A decision by a federal or state court.

(e) Evidentiary record. If a final decision of an agency or court finds that retaliation occurred, the Director may obtain and use information collected as part of those proceedings. The Director has discretion to give appropriate weight to information obtained from these proceedings and to initiate and conduct further investigation if the Director deems necessary, particularly with regard to the relationship between the retaliation and nuclear safety.

(f) Underlying nuclear safety requirements. Notwithstanding the commencement of an administrative or judicial proceeding based on an alleged act of retaliation, this section shall not prevent the Director from taking any action consistent with this part regarding compliance with DOE Nuclear Safety Requirements other than 10 CFR 708.43.

[81 FR 94914, Dec. 27, 2016]

Subpart B Enforcement Process

§ 820.20 Purpose and scope.

(a) Purpose. This subpart establishes the procedures for investigating the nature and extent of violations of DOE Nuclear Safety Requirements, for determining whether a violation of DOE Nuclear Safety Requirements has occurred, for imposing an appropriate remedy, and for adjudicating the assessment of a civil penalty.

(b) Basis for civil penalties. DOE may assess civil penalties against any person subject to the provisions of this part who has entered into an agreement of indemnification under 42 U.S.C. 2210(d) (or any subcontractor or supplier thereto), unless exempted from civil penalties as provided in paragraph (c) of this section, on the basis of a violation of a DOE Nuclear Safety Requirement.

(c) Exemptions. With respect to a violation occurring under a contract entered into before August 8, 2005, the following contractors, and subcontractors and suppliers to that prime contract only, are exempt from the assessment of civil penalties under this subpart with respect to the activities specified below:

(1) The University of Chicago for activities associated with Argonne National Laboratory;

(2) The University of California for activities associated with Los Alamos National Laboratory, Lawrence Livermore National Laboratory, and Lawrence Berkeley National Laboratory;

(3) American Telephone and Telegraph Company and its subsidiaries for activities associated with Sandia National Laboratories;

(4) University Research Association, Inc. for activities associated with FERMI National Laboratory;

(5) Princeton University for activities associated with Princeton Plasma Physics Laboratory;

(6) The Associated Universities, Inc. for activities associated with the Brookhaven National Laboratory; and

(7) Battelle Memorial Institute for activities associated with Pacific Northwest Laboratory.

(d) Nonprofit educational institutions. With respect to a violation occurring under a contract entered into before August 8, 2005, any educational institution that is considered nonprofit under the United States Internal Revenue Code shall receive automatic remission of any civil penalty assessed under this part.

(e) Limitation for not-for-profits. With respect to any violation occurring under a contract entered into on or after August 8, 2005, in the case of any not-for-profit contractor, subcontractor, or supplier, the total amount of civil penalties paid under this part may not exceed the total amount of fees paid by DOE to that entity within the U.S. Government fiscal year in which the violation occurs.

(f) Not-for-profit. For purposes of this part, a “not-for-profit” contractor, subcontractor, or supplier is one for which no part of the net earnings of the contractor, subcontractor, or supplier inures to the benefit of any natural person or for-profit artificial person.

[58 FR 43692, Aug. 17, 1993, as amended at 74 FR 11843, Mar. 20, 2009; 81 FR 94914, Dec. 27, 2016]

§ 820.21 Investigations.

(a) The Director may initiate and conduct investigations and inspections relating to the scope, nature and extent of compliance by a person with the Act and the DOE Nuclear Safety Requirements and take such action as he deems necessary and appropriate to the conduct of the investigation or inspection, including any action pursuant to § 820.8.

(b) Any person may request the Director to initiate an investigation or inspection pursuant to paragraph (a) of this section. A request for an investigation or inspection shall set forth the subject matter or activity to be investigated or inspected as fully as possible and include supporting documentation and information. No particular forms or procedures are required.

(c) Any person who is requested to furnish documentary evidence, information or testimony in an investigation or during an inspection shall be informed, upon written request, of the general purpose of the investigation or inspection.

(d) Information or documents that are obtained during any investigation or inspection shall not be disclosed unless the Director directs or authorizes the public disclosure of the investigation. Upon such authorization, the information or documents are a matter of public record and disclosure is not precluded by the Freedom of Information Act, 5 U.S.C. 552 and 10 CFR part 1004. A request for confidential treatment of information for purposes of the Freedom of Information Act shall not prevent disclosure by the Director if disclosure is determined to be in the public interest and otherwise permitted or required by law.

(e) During the course of an investigation or inspection any person may submit at any time any document, statement of facts or memorandum of law for the purpose of explaining the person's position or furnish information which the person considers relevant to a matter or activity under investigation or inspection.

(f) If facts disclosed by an investigation or inspection indicate that further action is unnecessary or unwarranted, the investigation may be closed without prejudice to further investigation or inspection by the Director at any time that circumstances so warrant.

(g) The Director may issue enforcement letters that communicate DOE's expectations with respect to any aspect of the requirements of DOE's Nuclear Safety Requirements, including identification and reporting of issues, corrective actions, and implementation of DOE's Nuclear Safety Requirements, provided that an enforcement letter may not create the basis for any legally enforceable requirement pursuant to this part.

(h) The Director may sign, issue and serve subpoenas.

[58 FR 43692, Aug. 17, 1993, as amended at 72 FR 31921, June 8, 2007]

§ 820.22 Informal conference.

The Director may convene an informal conference to discuss any situation that might be a violation of the Act or a DOE Nuclear Safety Requirement, its significance and cause, any correction taken or not taken by the person, any mitigating or aggravating circumstances, and any other useful information. The Director may compel a person to attend the conference. This conference will not normally be open to the public and there shall be no transcript.

§ 820.23 Consent order.

(a) Settlement policy. DOE encourages settlement of an enforcement proceeding at any time if the settlement is consistent with the objectives of the Act and the DOE Nuclear Safety Requirements. The Director and a person may confer at any time concerning settlement. These settlement conferences shall not be open to the public and there shall be no transcript.

(b) Consent order. Notwithstanding any other provision of this part, DOE may at any time resolve any or all issues in an outstanding enforcement proceeding with a Consent Order. A Consent Order must be signed by the Director and the person who is its subject, or a duly authorized representative, must indicate agreement to the terms contained therein and must be filed. A Consent Order need not constitute an admission by any person that the Act or a DOE Nuclear Safety Requirement has been violated, nor need it constitute a finding by the DOE that such person has violated the Act or a DOE Nuclear Safety Requirement. A Consent Order shall, however, set forth the relevant facts which form the basis for the Order and what remedy, if any, is imposed.

(c) Effect on enforcement adjudication. If a Consent Order is signed after the commencement of an enforcement adjudication, the adjudication of the issues subject to the Consent Order shall be stayed until the completion of the Secretarial Review Process. If the Consent Order becomes a Final Order, the adjudication shall be terminated or modified as specified in the Order.

(d) Secretarial review. A Consent Order shall become a Final Order 30 days after it is filed unless the Secretary files a rejection of the Consent Order or a Modified Consent Order. A Modified Consent Order shall become a Final Order if the Director and the person who is its subject sign it within 15 days of its filing.

§ 820.24 Preliminary notice of violation.

(a) If the Director has reason to believe a person has violated or is continuing to violate a provision of the Act or a DOE Nuclear Safety Requirement, he may file a Preliminary Notice of Violation. The Notice and any transmittal documents shall contain sufficient information to fairly apprise the respondent of the facts and circumstances of the alleged violations and the basis of any proposed remedy, and to properly indicate what further actions are necessary by or available to respondent.

(b) Within 30 days after the filing of a Preliminary Notice of Violation, the respondent shall file a reply.

(c) The reply shall be in writing and signed by the person filing it. The reply shall contain a statement of all relevant facts pertaining to the situation that is the subject of the Notice. The reply shall state any facts, explanations and arguments which support a denial that a violation has occurred as alleged; demonstrate any extenuating circumstances or other reason why the proposed remedy should not be imposed or should be mitigated; and furnish full and complete answers to the questions set forth in the Notice. Copies of all relevant documents shall be submitted with the reply. The reply shall include a discussion of the relevant authorities which support the position asserted, including rulings, regulations, interpretations, and previous decisions issued by DOE.

(d) The respondent may terminate an enforcement action if the reply agrees to comply with the proposed remedy and waives any right to contest the Notice or the remedy. If a respondent elects this option, the Preliminary Notice of Violation shall be deemed a Final Order upon the filing of the reply.

§ 820.25 Final notice of violation.

(a) General rule. If, after reviewing the reply submitted by the respondent, the Director determines that a person violated or is continuing to violate a provision of the Act or a DOE Nuclear Safety Requirement, he may file a Final Notice of Violation. The Final Notice shall concisely state the determined violation, any designated penalty, and further actions necessary by or available to respondent.

(b) Effect of final notice. (1) If a Final Notice of Violation does not contain a civil penalty, it shall be deemed filed as a Final Order 15 days after the Final Notice is filed unless the Secretary files a Final Order which modifies the Final Notice.

(2) If a Final Notice of Violation contains a civil penalty, the respondent must file within 30 days after the filing of the Final Notice:

(i) A waiver of further proceedings;

(ii) A request for an on-the-record adjudication; or

(iii) A notice of intent to seek judicial review.

(c) Effect of waiver. If a respondent waives further proceedings, the Final Notice of Violation shall be deemed a Final Order enforceable against the respondent. The respondent must pay any civil penalty set forth in the Notice of Violation within 60 days of the filing of waiver unless the Director grants additional time.

(d) Effect of request. If a respondent files a request for an on-the-record adjudication, then an enforcement adjudication commences.

(e) Effect of notice of intent. If a respondent files a Notice of Intent, the Final Notice of Violation shall be deemed a Final Order enforceable against the respondent.

(f) Amendment. The Director may amend the Final Notice of Violation at any time before an action takes place pursuant to paragraph (b) of this section. An amendment shall add fifteen days to the time periods under paragraph (b) of this section.

(g) Withdrawal. The Director may withdraw the Final Notice of Violation, or any part thereof, at any time before an action under paragraph (b) of this section.

§ 820.26 Enforcement adjudication.

If a respondent files a request for an on-the-record adjudication, an enforcement adjudication is initiated and the Docketing Clerk shall notify the Secretary who shall appoint an Administrative Law Judge to be the Presiding Officer.

§ 820.27 Answer.

(a) General. If a respondent files a request for an on-the-record adjudication pursuant to § 820.25, a written answer to the Final Notice of Violation shall be filed at the same time the request is filed.

(b) Contents of the answer. The answer shall clearly and directly admit, deny or explain each of the factual allegations contained in the Final Notice of Violation with regard to which respondent has any knowledge, information or belief. Where respondent has no knowledge, information or belief of a particular factual allegation and so states, the allegation is deemed denied. The answer shall also state the circumstance or argument that is alleged to constitute the grounds of defense and the facts that respondent intends to place at issue.

(c) Failure to admit, deny, or explain. Failure of respondent to admit, deny, or explain any material factual allegation contained in the Final Notice of Violation constitutes an admission of the allegation.

(d) Amendment of the answer. The respondent may amend the answer to the Final Notice of Violation upon motion granted by the Presiding Officer.

§ 820.28 Prehearing actions.

(a) General. The Presiding Officer shall establish a schedule for the adjudication and take such other actions as he determines appropriate to conduct the adjudication in a fair and expeditious manner.

(b) Prehearing conference. The Presiding Officer, at any time before a hearing begins, may direct the parties and their counsel, or other representatives, to appear at a conference before him to consider, as appropriate:

(1) The settlement of the case;

(2) The simplification of issues and stipulation of facts not in dispute;

(3) The necessity or desirability of amendments to pleadings;

(4) The exchange of exhibits;

(5) The limitation of the number of expert or other witnesses;

(6) Setting a time and place for the hearing; and

(7) Any other matters that may expedite the disposition of the proceeding.

(c) Exchange of witness lists and documents. Unless otherwise ordered by the Presiding Officer, at least five (5) days before any prehearing conference, each party shall make available to all other parties, as appropriate, the names of the expert and other witnesses it intends to call, together with a brief narrative summary of their expected testimony, and copies of all documents and exhibits that each party intends to introduce into evidence. Documents and exhibits shall be marked for identification as ordered by the Presiding Officer. Documents that have not been exchanged and witnesses whose names have not been exchanged shall not be introduced into evidence or allowed to testify without permission of the Presiding Officer. The Presiding Officer shall allow the parties reasonable opportunity to review new evidence.

(d) Prehearing conference order. The Presiding Officer shall prepare an order incorporating any action taken at the conference. The summary shall incorporate any written stipulations or agreements of the parties and all rulings and appropriate orders containing directions to the parties.

(e) Alternative to prehearing conference. If a prehearing conference is unnecessary or impracticable, the Presiding Officer, on motion or sua sponte, may direct the parties to make appropriate filings with him to accomplish any of the objectives set forth in this section.

(f) Other discovery. (1) Except as provided by paragraph (c) of this section, further discovery under this section shall be permitted only upon determination by the Presiding Officer:

(i) That such discovery will not in any way unreasonably delay the proceeding;

(ii) That the information to be obtained is not otherwise obtainable; and

(iii) That such information has significant probative value.

(2) The Presiding Officer shall order depositions upon oral questions only upon a showing of good cause and upon a finding that:

(i) The information sought cannot be obtained by alternative methods; or

(ii) There is substantial reason to believe that relevant and probative evidence may otherwise not be preserved for presentation by a witness at the hearing.

(3) Any party to the proceeding desiring an order to take further discovery shall make a motion therefor. Such a motion shall set forth:

(i) The circumstances warranting the taking of the discovery;

(ii) The nature of the information expected to be discovered; and

(iii) The proposed time and place where it will be taken. If the Presiding Officer determines that the motion should be granted, he shall issue an order for the taking of such discovery together with the conditions and terms thereof.

(4) When the information sought to be obtained is within the control of one of the parties, failure to comply with an order issued pursuant to this paragraph may lead to the inference that the information to be discovered would be adverse to the party from whom the information was sought, or the issuance of a default order under 820.38.

§ 820.29 Hearing.

(a) General. Except as otherwise provided by this part or the Presiding Officer, a hearing shall be conducted in accordance with the Federal Rules of Evidence. The Presiding Officer shall have the discretion to admit all evidence that is not irrelevant, immaterial, unduly repetitious, or otherwise unreliable or of little probative value, if he believes the evidence might facilitate the fair and expeditious resolution of the proceeding. But such evidence may be reasonably limited by the Presiding Officer in scope and length in order to permit prompt resolution of the proceeding. In the presentation, admission, disposition, and use of evidence, the Presiding Officer shall preserve the confidentiality of trade secrets and other commercial and financial information, and shall protect classified and unclassified controlled nuclear information, as well as any other information protected from public disclosure pursuant to law or regulation. The confidential, trade secret, or classified or otherwise protected status of any information shall not, however, preclude its being introduced into evidence. The Presiding Officer may make such orders as may be necessary to consider such evidence in camera, including the preparation of a supplemental initial decision to address questions of law, fact, or discretion that arise out of that portion of the evidence that is confidential, includes trade secrets, is classified, or is otherwise protected.

(b) Subpoenas. The attendance of witnesses or the production of documentary evidence may be required by subpoena.

(c) Examination of witnesses. There shall be no direct oral testimony by witnesses, except as permitted by the Presiding Officer. In lieu of oral testimony, the Presiding Officer shall admit into the record as evidence verified written statements of fact or opinion prepared by a witness. The admissibility of the evidence contained in the statement shall be subject to the same rules as if the testimony were produced under oral examination. Before any such statement is read or admitted into evidence, the witness shall have delivered a copy of the statement to the Presiding Officer and the opposing counsel not less than 10 days prior to the date the witness is scheduled to testify. The witness presenting the statement shall swear or affirm that the statement is true and accurate to the best of his knowledge, information, and belief and shall be subject to appropriate oral cross-examination upon the contents thereof provided such cross-examination is not unduly repetitious.

(d) Burden of presentation; burden of persuasion. The Director has the burden of going forward with and of proving that the violation occurred as set forth in the Notice of Violation and that the proposed civil penalty is appropriate. Following the establishment of a prima facie case, respondent shall have the burden of presenting and of going forward with any defense to the allegations set forth in the Notice of Violation. Each matter of controversy shall be determined by the Presiding Officer upon a preponderance of the evidence.

§ 820.30 Post-hearing filings.

Within fifteen days after the filing of the transcript of the hearing, or within such longer time as may be fixed by the Presiding Officer, any party may file for the consideration of the Presiding Officer, proposed findings of fact, conclusions of law, and a proposed order, together with briefs in support thereof. Reply briefs may be filed within ten days of the filing of briefs. All filings shall be in writing, shall be served upon all parties, and shall contain adequate references to the record and authorities relied on.

§ 820.31 Initial decision.

(a) Initial Decision. The Presiding Officer shall file an Initial Decision as soon as practicable after the period for filing reply briefs under 820.30 has expired. The Initial Decision shall contain findings of fact, conclusions regarding all material issues of law or discretion, as well as reasons therefor, any remedy and a proposed Final Order. A party may file comments on an Initial Decision within fifteen days of its filing.

(b) Amount of civil penalty. If the Presiding Officer determines that a violation has occurred and that a civil penalty is appropriate, the Initial Decision shall set forth the dollar amount of the civil penalty. If the Presiding Officer decides to assess a penalty different in amount from the penalty assessed in the Final Notice of Violation, the Initial Decision shall set forth the specific reasons for the increase or decrease.

§ 820.32 Final order.

(a) Effect of Initial Decision. The Initial Decision shall be deemed filed as a Final Order thirty days after the filing of the Initial Decision unless the Secretary files a Final Order that modifies the Initial Decision or the Secretary files a Notice of Review.

(b) Notice of review. If the Secretary files a Notice of Review, he shall file a Final Order as soon as practicable after completing his review. The Secretary may, at his discretion, order additional procedures, remand the matter or modify the remedy, including an increase or decrease in the amount of the civil penalty from the amount recommended to be assessed in the Initial Decision.

(c) Payment of a civil penalty. The respondent shall pay the full amount of any civil penalty assessed in the Final Order within thirty (30) days after the Final Order is filed unless otherwise agreed by the parties.

§ 820.33 Default order.

(a) Default. The Presiding Officer, upon motion by a party or the filing of a Notice of Intent to issue a Default Order sua sponte, may find a party to be in default if the party fails to comply with the provisions of this part or an order of the Presiding Officer. The alleged defaulting party shall have ten days to answer the motion or the Notice of Intent. No finding of default shall be made against the respondent unless the Director presents sufficient evidence to the Presiding Officer to establish a prima facie case against the respondent. Default by respondent constitutes, for purposes of the pending action only, an admission of all facts alleged in the Final Notice of Violation and a waiver of respondent's rights to an on-the-record adjudication of such factual allegations. Default by the Director shall result in an order to dismiss the Final Notice of Violation with prejudice.

(b) Effect of default order. When the Presiding Officer finds a default has occurred, he shall file a Default Order against the defaulting party. This order shall constitute an Initial Decision.

(c) Contents of a default order. A Default Order shall include findings of fact showing the grounds for the order, conclusions regarding all material issues of fact, law or discretion, and the remedy.

§ 820.34 Accelerated decision.

(a) General. The Presiding Officer, upon motion of any party or sua sponte, may at any time render an Accelerated Decision in favor of the Director or the respondent as to all or any part of the adjudication, without further hearing or upon such limited additional evidence, such as affidavits, as he may require, if no genuine issue of material fact exists and a party is entitled to judgment as a matter of law, as to all or any part of the adjudication. In addition, the Presiding Officer, upon motion of the respondent, may render at any time an Accelerated Decision to dismiss an action without further hearing or upon such limited additional evidence as he requires, on the basis of failure to establish a prima facie case or other grounds that show no right to relief on the part of the Director.

(b) Effect of Accelerated Decision. (1) If an Accelerated Decision is rendered as to all the issues and claims in the adjudication, the decision constitutes an Initial Decision of the Presiding Officer, and shall be filed with the Docketing Clerk.

(2) If an Accelerated Decision is rendered on less than all issues or claims in the adjudication, the Presiding Officer shall determine what material facts exist without substantial controversy and what material facts remain controverted in good faith. He shall thereupon file an interlocutory order specifying the facts that appear substantially uncontroverted, and the issues and claims upon which the adjudication will proceed.

§ 820.35 Ex parte discussions.

At no time after a respondent has requested an on-the-record adjudication of the assessment of a civil penalty shall a DOE Official, or any person who is likely to advise a DOE Official in the decision on the case, discuss ex parte the merits of the proceeding with any interested person outside DOE, with any DOE staff member who performs a prosecutorial or investigative function in such proceeding or a factually related proceeding, or with any representative of such person. Any ex parte memorandum or other communication addressed to a DOE Official during the pendency of the proceeding and relating to the merits thereof, by or on behalf of any party shall be regarded as argument made in the proceeding and shall be served upon all other parties. Any oral communication shall be set forth in a written memorandum and served on all other parties. The other parties shall be given an opportunity to reply to such memorandum or communication.

§ 820.36 Filing, form, and service of documents.

(a) Filing in an enforcement proceeding. The original and three copies of any document in an enforcement proceeding shall be filed with the Docketing Clerk commencing with the filing of a Preliminary Notice of Violation.

(b) Form of documents in an enforcement proceeding. (1) Except as provided herein, or by order of the DOE Official, there are no specific requirements as to the form of documents filed in an enforcement proceeding.

(2) The first page of every document shall contain a caption identifying the respondent and the docket number.

(3) The original of any document (other than exhibits) shall be signed by the person filing it or by his counsel or other representative. The signature constitutes a representation by the signer that he has read the pleading, letter or other document, that to the best of his knowledge, information and belief, the statements made therein are true, and that it is not interposed for delay.

(4) The initial document filed by any person shall contain his name, address and telephone number. Any changes in this information shall be communicated promptly to the Docketing Clerk and all participants to the proceeding. A person who fails to furnish such information and any changes thereto shall be deemed to have waived his right to notice and service under this part.

(5) The Docketing Clerk may refuse to file any document that does not comply with this section. Written notice of such refusal, stating the reasons therefor, shall be promptly given to the person submitting the document. Such person may amend and resubmit any document refused for filing.

§ 820.37 Participation in an adjudication.

(a) Parties. In an enforcement adjudication, the Director and the respondent shall be the only parties; provided that the Presiding Officer may permit a person to intervene as a party if the person demonstrates it could be liable in the event a civil penalty is assessed.

(b) Appearances. Any party to an enforcement adjudication may appear in person or by counsel or other representative. A partner may appear on behalf of a partnership and an officer may appear on behalf of a corporation. Persons who appear as counsel or other representative must conform to the standards of conduct and ethics required of practitioners before the courts of the United States.

(c) Amicus Curiae. Persons not parties to an enforcement adjudication who wish to file briefs may so move. The motion shall identify the interest of the person and shall state the reasons why the proposed amicus brief is desirable. If the motion is granted, the Presiding Officer shall issue an order setting the time for filing such brief. An amicus curiae is eligible to participate in any briefing after his motion is granted, and shall be served with all briefs, reply briefs, motions, and orders relating to issues to be briefed.

§ 820.38 Consolidation and severance.

(a) Consolidation. The Presiding Officer may, by motion or sua sponte, consolidate any or all matters at issue in two or more enforcement adjudications under this part where there exists common parties or common questions of fact or law, consolidation would expedite and simplify consideration of the issues, and consolidation would not adversely affect the rights of parties engaged in otherwise separate adjudications.

(b) Severance. The Presiding Officer may, by motion or sua sponte, for good cause shown order any enforcement adjudication severed with respect to any or all parties or issues.

§ 820.39 Motions.

(a) General. All motions in an enforcement adjudication except those made orally, shall be in writing, state the grounds therefor with particularity, set forth the relief or order sought, and be accompanied by any affidavit, certificate, other evidence, or legal memorandum relied upon.

(b) Answer to motions. Except as otherwise specified by a particular provision of this part or by the Presiding Officer, a party shall have the right to file a written answer to the motion of another party within 10 days after the filing of such motion. The answer shall be accompanied by any affidavit, certificate, other evidence, or legal memorandum relied upon. If no answer is filed within the designated period, the party may be deemed to have waived any objection to the granting of the motion. The Presiding Officer may set a shorter or longer time for an answer, or make such other orders concerning the disposition of motions as he deems appropriate.

(c) Decision. The Presiding Officer shall rule on a motion as soon as practicable after the filing of the answer. The decision of the Presiding Officer on any motion shall not be subject to administrative appeal.

Subpart C Compliance Orders

§ 820.40 Purpose and scope.

This subpart provides for the issuance of Compliance Orders to prevent, rectify or penalize violations of the Act, a Nuclear Statute, or a DOE Nuclear Safety Requirement and to require action consistent with the Act, a Nuclear Statute, or a DOE Nuclear Safety Requirement.

§ 820.41 Compliance order.

The Secretary may issue to any person involved in a DOE nuclear activity a Compliance Order that:

(a) Identifies a situation that violates, potentially violates, or otherwise is inconsistent with the Act, a Nuclear Statute, or a DOE Nuclear Safety Requirement;

(b) Mandates a remedy or other action; and,

(c) States the reasons for the remedy or other action.

§ 820.42 Final order.

A Compliance Order is a Final Order that constitutes a DOE Nuclear Safety Requirement that is effective immediately unless the Order specifies a different effective date.

§ 820.43 Appeal.

Within fifteen days of the issuance of a Compliance Order, the recipient of the Order may request the Secretary to rescind or modify the Order. A request shall not stay the effectiveness of a Compliance Order unless the Secretary issues an order to that effect.

Subpart D Interpretations

§ 820.50 Purpose and scope.

This subpart provides for interpretations of the Act, Nuclear Statutes, and DOE Nuclear Safety Requirements. Any written or oral response to any written or oral question which is not provided pursuant to this subpart does not constitute an interpretation and does not provide any basis for action inconsistent with the Act, a Nuclear Statute, or a DOE Nuclear Safety Requirement.

§ 820.51 General Counsel.

The General Counsel shall be the DOE Official responsible for formulating and issuing any interpretation concerning the Act, a Nuclear Statute or a DOE Nuclear Safety Requirement.

§ 820.52 Procedures.

The General Counsel may utilize any procedure which he deems appropriate to comply with his responsibilities under this subpart. All interpretations issued under this subpart must be filed with the Office of the Docketing Clerk which shall maintain a docket for interpretations.

Subpart E Exemption Relief

§ 820.60 Purpose and scope.

This subpart provides for exemption relief from provisions of DOE Nuclear Safety Requirements at nuclear facilities.

§ 820.61 Secretarial officer.

The Secretarial Officer who is primarily responsible for the activity to which a DOE Nuclear Safety Requirement relates may grant a temporary or permanent exemption from that requirement as requested by any person subject to its provisions; provided that, the Secretarial Officer responsible for environment, safety and health matters shall exercise this authority with respect to provisions relating to radiological protection of workers, the public and the environment. This authority may not be further delegated.

§ 820.62 Criteria.

The criteria for granting an exemption to a DOE Nuclear Safety Requirement are determinations that the exemption:

(a) Would be authorized by law;

(b) Would not present an undue risk to public health and safety, the environment, or facility workers;

(c) Would be consistent with the safe operation of a DOE nuclear facility; and

(d) Involves special circumstances, including the following:

(1) Application of the requirement in the particular circumstances conflicts with other requirements; or

(2) Application of the requirement in the particular circumstances would not serve or is not necessary to achieve its underlying purpose, or would result in resource impacts which are not justified by the safety improvements; or

(3) Application of the requirement would result in a situation significantly different than that contemplated when the requirement was adopted, or that is significantly different from that encountered by others similarly situated; or

(4) The exemption would result in benefit to human health and safety that compensates for any detriment that may result from the grant of the exemption; or

(5) Circumstances exist which would justify temporary relief from application of the requirement while taking good faith action to achieve compliance; or

(6) There is present any other material circumstance not considered when the requirement was adopted for which it would be in the public interest to grant an exemption.

§ 820.63 Procedures.

The Secretarial Officer shall utilize any procedures deemed necessary and appropriate to comply with his responsibilities under this subpart. All exemption decisions must set forth in writing the reasons for granting or denying the exemption, and if granted, the basis for the determination that the criteria in § 820.62 have been met and the terms of the exemption. All exemption decisions must be filed with the Office of the Docketing Clerk which shall maintain a docket for exemption decisions issued pursuant to this subpart.

§ 820.64 Terms and conditions.

An exemption may contain appropriate terms and conditions including, but not limited to, provisions that :

(a) Limit its duration;

(b) Require alternative action;

(c) Require partial compliance; or

(d) Establish a schedule for full or partial compliance.

§ 820.65 Implementation plan.

With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation plan which reasonably demonstrates that full compliance with the requirement will be achieved within two years of the effective date of the requirement without a determination of special circumstances under § 820.62(d).

§ 820.66 Appeal.

Within fifteen (15) days of the filing of an exemption decision by a Secretarial Officer, the person requesting the exemption may file a Request to Review with the Secretary, or the Secretary may file, sua sponte, a Notice of Review. The Request to Review shall state specifically the respects in which the exemption determination is claimed to be erroneous, the grounds of the request, and the relief requested.

§ 820.67 Final order.

If no filing is made under § 820.66, an exemption decision becomes a Final Order fifteen (15) days after it is filed by a Secretarial Officer. If filing is made under § 820.66, an exemption decision becomes a Final Order 45 days after it is filed by a Secretarial Officer, unless the Secretary stays the effective date or issues a Final Order that modifies the decision.

Subpart F Criminal Penalties

§ 820.70 Purpose and scope.

This subpart provides for the identification of criminal violations of the Act or DOE Nuclear Safety Requirements and the referral of such violations to the Department of Justice.

§ 820.71 Standard.

If a person subject to the Act or the DOE Nuclear Safety Requirements has, by act or omission, knowingly and willfully violated, caused to be violated, attempted to violate, or conspired to violate any section of the Act or any applicable DOE Nuclear Safety Requirement, the person shall be subject to criminal sanctions under the Act.

§ 820.72 Referral to the Attorney General.

If there is reason to believe a criminal violation of the Act or the DOE Nuclear Safety Requirements has occurred, DOE may refer the matter to the Attorney General of the United States for investigation or prosecution.

Subpart G Civil Penalties

Source: 62 FR 46184, Sept. 2, 1997, unless otherwise noted.

§ 820.80 Basis and purpose.

This subpart implements the Federal Civil Penalties Inflation Adjustment Act of 1990 (the Act) (Pub. L. 101-410), as amended by the Debt Collection Improvement Act of 1996 (Pub. L. 104-134, section 31001) and the Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015 (Pub. L. 114-74, section 701). 28 U.S.C. 2461 note. As amended, the Act requires each agency head to adjust by regulation each civil monetary penalty provided by law within the jurisdiction of the Federal agency by the inflation adjustment specified in 28 U.S.C. 2461 note. This subpart increases the civil penalty amount specified in 42 U.S.C. 2282a.

[62 FR 46184, Sept. 2, 1997, as amended at 81 FR 41794, June 28, 2016]

§ 820.81 Amount of penalty.

Any person subject to a penalty under 42 U.S.C. 2282a shall be subject to a civil penalty in an amount not to exceed $262,614 for each such violation. If any violation under 42 U.S.C. 2282a is a continuing one, each day of such violation shall constitute a separate violation for the purpose of computing the applicable civil penalty.

[62 FR 46184, Sept. 2, 1997, as amended at 74 FR 66033, Dec. 14, 2009; 79 FR 19, Jan. 2, 2014; 81 FR 41794, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66083, Dec. 26, 2018; 85 FR 830, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2193, Jan. 13, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024]

Appendix A to Part 820 General Statement of Enforcement Policy

I. Introduction

(a) This policy statement sets forth the general framework through which the U.S. Department of Energy (DOE) will seek to ensure compliance with its enforceable nuclear safety regulations and orders (hereafter collectively referred to as DOE Nuclear Safety Requirements) and, in particular, exercise the civil penalty authority provided to DOE in the Price Anderson Amendments Act of 1988, 42 U.S.C. 2282a (PAAA). The policy set forth herein is applicable to violations of DOE Nuclear Safety Requirements by DOE contractors who are indemnified under the Price Anderson Act, 42 U.S.C. 2210(d), and their subcontractors and suppliers (hereafter collectively referred to as DOE contractors). This policy statement is not a regulation and is intended only to provide general guidance to those persons subject to DOE's Nuclear Safety Requirements as specified in the PAAA. It is not intended to establish a “cookbook” approach to the initiation and resolution of situations involving noncompliance with DOE Nuclear Safety Requirements. Rather, DOE intends to consider the particular facts of each noncompliance situation in determining whether enforcement sanctions are appropriate and, if so, the appropriate magnitude of those sanctions. DOE may well deviate from this policy statement when appropriate in the circumstances of particular cases. This policy statement is not applicable to activities and facilities covered under E.O. 12344, 42 U.S.C. 7158 note, pertaining to Naval nuclear propulsion.

(b) Both the Department of Energy Organization Act, 42 U.S.C. 7101, and the Atomic Energy Act of 1954, as amended, 42 U.S.C. 2011, require DOE to protect the public health and safety, as well as the safety of workers at DOE facilities, in conducting its nuclear activities, and grant DOE broad authority to achieve this goal.

(c) The DOE goal in the compliance arena is to enhance and protect the radiological health and safety of the public and worker at DOE facilities by fostering a culture among both the DOE line organizations and the contractors that activity seeks to attain and sustain compliance with DOE Nuclear Safety Requirements. The enforcement program and policy have been developed with the express purpose of achieving safety inquisitiveness and voluntary compliance. DOE will establish effective administrative processes and positive incentives to the contractors for the open and prompt identification and reporting of noncompliances, and the initiation of comprehensive corrective actions to resolve both the noncompliance conditions and the program or process deficiencies that led to noncompliance.

(d) In the development of the DOE enforcement policy, DOE recognizes that the reasonable exercise of its enforcement authority can help to reduce the likelihood of serious incidents. This can be accomplished by providing greater emphasis on a culture of safety in existing DOE operations, and strong incentives for contractors to identify and correct noncompliance conditions and processes in order to protect human health and the environment. DOE wants to facilitate, encourage, and support contractor initiatives for the prompt identification and correction of problems. These initiatives and activities will be duly considered in exercising enforcement discretion.

(e) The PAAA provides DOE with the authority to compromise, modify, or remit civil penalties with or without conditions. In implementing the PAAA, DOE will carefully consider the facts of each case of noncompliance and will exercise appropriate discretion in taking any enforcement action. Part of the function of a sound enforcement program is to assure a proper and continuing level of safety vigilance. The reasonable exercise of enforcement authority will be facilitated by the appropriate application of safety requirements to nuclear facilities and by promoting and coordinating the proper contractor and DOE safety compliance attitude toward those requirements.

II. Purpose

The purpose of the DOE enforcement program is to promote and protect the radiological health and safety of the public and workers at DOE facilities by:

a. Ensuring compliance by DOE contractors with applicable DOE Nuclear Safety Requirements.

b. Providing positive incentives for a DOE contractor's:

(1) Timely self-identification of nuclear safety deficiencies,

(2) Prompt and complete reporting of such deficiencies to DOE,

(3) Root cause analyses of nuclear safety deficiencies,

(4) Prompt correction of nuclear safety deficiencies in a manner which precludes recurrence, and

(5) Identification of modifications in practices or facilities that can improve public or worker radiological health and safety.

c. Deterring future violations of DOE requirements by a DOE contractor.

d. Encouraging the continuous overall improvement of operations at DOE nuclear facilities.

III. Statutory Authority

Section 17 of the PAAA makes most DOE contractors covered by the DOE Price-Anderson indemnification system, and their subcontractors and suppliers, subject to civil penalties for violations of applicable DOE nuclear safety rules, regulations and orders. 42 U.S.C. 2282a. Furthermore, section 18 of the PAAA makes all employees of DOE contractors, and their subcontractors and suppliers, subject to criminal penalties, including monetary penalties and imprisonment, for knowing and willful violations of applicable DOE nuclear safety rules, regulations and orders. 42 U.S.C. 2273(c). Suspected, or alleged, criminal violations are referred to the Department of Justice for appropriate action. 42 U.S.C. 2271. Therefore, DOE's enforcement authority and policy will apply only to civil penalties since decisions on criminal violations are the responsibility of the Department of Justice. However, referral of a case to the Department of Justice does not preclude DOE from taking civil enforcement action in accordance with this policy statement. Such actions will be coordinated with the Department of Justice to the extent practicable.

IV. Responsibilities

(a) The Director, as the principal enforcement officer of DOE, has been delegated the authority to:

(1) Conduct enforcement inspections, investigations, and conferences;

(2) Issue Notices of Violations and proposed civil penalties, Enforcement Letters, Consent Orders, and subpoenas; and

(3) Issue orders to compel attendance and disclosure of information or documents obtained during an investigation or inspection.

(b) The NNSA Administrator, pursuant to section 3212 (b)(9) of Public Law 106-65 (codified at 50 U.S.C. 2402 (b)(9)), as amended, has authority over and responsibility for environment, safety and health operations within NNSA and is authorized to sign, issue and serve the following actions that direct NNSA contractors:

(1) Subpoenas;

(2) Orders to compel attendance;

(3) Disclosure of information or documents obtained during an investigation or inspection;

(4) Preliminary Notices of Violations; and

(5) Final Notices of Violations.

The NNSA Administrator acts after consideration of the Director's recommendation.

V. Procedural Framework

(a) 10 CFR part 820 sets forth the procedures DOE will use in exercising its enforcement authority, including the issuance of Notices of Violation and the resolution of contested enforcement actions in the event a DOE contractor elects to litigate contested issues before an Administrative Law Judge.

(b) Pursuant to 10 CFR 820.22, the Director initiates the civil penalty process by issuing a Preliminary Notice of Violation and Proposed Civil Penalty (PNOV). The DOE contractor is required to respond in writing to the PNOV, either admitting the violation and waiving its right to contest the proposed civil penalty and paying it, admitting the violation but asserting the existence of mitigating circumstances that warrant either the total or partial remission of the civil penalty, or denying that the violation has occurred and providing the basis for its belief that the PNOV is incorrect. After evaluation of the DOE contractor's response, the Director of Enforcement may determine that no violation has occurred, that the violation occurred as alleged in the PNOV but that the proposed civil penalty should be remitted in whole or in part, or that the violation occurred as alleged in the PNOV and that the proposed civil penalty is appropriate notwithstanding the asserted mitigating circumstances. In the latter two instances, the Director will issue a Final Notice of Violation (FNOV) or an FNOV and Proposed Civil Penalty.

(c) An opportunity to challenge a proposed civil penalty either before an Administrative Law Judge or in a United States District Court is provided in the PAAA, 42 U.S.C. 2282a(c), and 10 CFR part 820 sets forth the procedures associated with an administrative hearing, should the contractor opt for that method of challenging the proposed civil penalty. A formal administrative enforcement proceeding pursuant to section 554 of the Administrative Procedures Act is not initiated until the DOE contractor against which a civil penalty has been proposed requests an administrative hearing rather than waiving its right to contest the civil penalty and paying it. However, it should be emphasized that DOE encourages the voluntary resolution of a noncompliance situation at any time, either informally prior to the initiation of an administrative proceeding or by consent order after a formal proceeding has begun.

VI. Severity of Violations

(a) Violations of DOE Nuclear Safety Requirements have varying degrees of safety significance. Therefore, the relative importance of each violation must be identified as the first step in the enforcement process. Violations of DOE Nuclear Safety Requirements are categorized in three levels of severity to identify their relative safety significance, and Notices of Violation are issued for noncompliance which, when appropriate, propose civil penalties commensurate with the severity level of the violation(s) involved.

(b) Severity Level I has been assigned to violations that are the most significant and Severity Level III violations are the least significant. Severity Level I is reserved for violations of DOE Nuclear Safety Requirements which involve actual or high potential for adverse impact on the safety of the public or workers at DOE facilities. Severity level II violations represent a significant lack of attention or carelessness toward responsibilities of DOE contractors for the protection of public or worker safety which could, if uncorrected, potentially lead to an adverse impact on public or worker safety at DOE facilities. Severity Level III violations are less serious but are of more than minor concern: i.e., if left uncorrected, they could lead to a more serious concern. In some cases, violations may be evaluated in the aggregate and a single severity level assigned for a group of violations.

(c) Isolated minor violations of DOE Nuclear Safety Requirements will not be the subject of formal enforcement action through the issuance of a Notice of Violation. However, these minor violations will be identified as noncompliances and tracked to assure that appropriate corrective/remedial action is taken to prevent their recurrence, and evaluated to determine if generic or specific problems exist. If circumstances demonstrate that a number of related minor noncompliances have occurred in the same time frame (e.g. all identified during the same assessment), or that related minor noncompliances have recurred despite prior notice to the DOE contractor and sufficient opportunity to correct the problem, DOE may choose in its discretion to consider the noncompliances in the aggregate as a more serious violation warranting a Severity Level III designation, a Notice of Violation and a possible civil penalty.

(d) The severity level of a violation will be dependent, in part, on the degree of culpability of the DOE contractor with regard to the violation. Thus, inadvertent or negligent violations will be viewed differently than those in which there is gross negligence, deception or wilfulness. In addition to the significance of the underlying violation and level of culpability involved, DOE will also consider the position, training and experience of the person involved in the violation. Thus, for example, a violation may be deemed to be more significant if a senior manager of an organization is involved rather than a foreman or non-supervisory employee. In this regard, while management involvement, direct or indirect, in a violation may lead to an increase in the severity level of a violation and proposed civil penalty, the lack of such involvement will not constitute grounds to reduce the severity level of a violation or mitigate a civil penalty. Allowance of mitigation in such circumstances could encourage lack of management involvement in DOE contractor activities and a decrease in protection of public and worker health and safety.

(e) Other factors which will be considered by DOE in determining the appropriate severity level of a violation are the duration of the violation, the past performance of the DOE contractor in the particular activity area involved, whether the DOE contractor had prior notice of a potential problem, and whether there are multiple examples of the violation in the same time frame rather than an isolated occurrence. The relative weight given to each of these factors in arriving at the appropriate severity level will be dependent on the circumstances of each case.

(f) DOE expects contractors to provide full, complete, timely, and accurate information and reports. Accordingly, the severity level of a violation involving either failure to make a required report or notification to the DOE or an untimely report or notification, will be based upon the significance of, and the circumstances surrounding, the matter that should have been reported. A contractor will not normally be cited for a failure to report a condition or event unless the contractor was actually aware, or should have been aware of the condition or event which it failed to report.

VII. Enforcement Conferences

(a) Should DOE determine, after completion of all assessment and investigation activities associated with a potential or alleged violation of DOE Nuclear Safety Requirements, that there is a reasonable basis to believe that a violation has actually occurred, and the violation may warrant a civil penalty or issuance of an enforcement order, DOE will normally hold an enforcement conference with the DOE contractor involved prior to taking enforcement action. DOE may also elect to hold an enforcement conference for potential violations which would not ordinarily warrant a civil penalty or enforcement order but which could, if repeated, lead to such action. The purpose of the enforcement conference is to assure the accuracy of the facts upon which the preliminary determination to consider enforcement action is based, discuss the potential or alleged violations, their significance and causes, and the nature of and schedule for the DOE contractor's corrective actions, determine whether there are any aggravating or mitigating circumstances, and obtain other information which will help determine the appropriate enforcement action.

(b) DOE contractors will be informed prior to a meeting when that meeting is considered to be an enforcement conference. Such conferences are informal mechanisms for candid pre-decisional discussions regarding potential or alleged violations and will not normally be open to the public. In circumstances for which immediate enforcement action is necessary in the interest of public or worker health and safety, such action will be taken prior to the enforcement conference, which may still be held after the necessary DOE action has been taken.

VIII. Enforcement Letter

(a) In cases where DOE has decided not to conduct an investigation or inspection or issue a Preliminary Notice of Violation (PNOV), DOE may send an Enforcement Letter to the contractor, signed by the Director. Enforcement Letters issued to NNSA contractors will be coordinated with the Principal Deputy Administrator of the NNSA prior to issuance. The Enforcement Letter is intended to communicate the basis of the decision not to pursue enforcement action for a noncompliance. The Enforcement Letter is intended to inform contractors of the desired level of nuclear safety performance. It may be used when DOE concludes the specific noncompliance at issue is not of the level of significance warranted to conduct an investigation or inspection or for issuance of a PNOV. Even where a noncompliance may be significant, the Enforcement Letter recognizes that the contractor's actions may have attenuated the need for enforcement action. The Enforcement Letter will typically recognize how the contractor handled the circumstances surrounding the noncompliance, address additional areas requiring the contractor's attention, and address DOE's expectations for corrective action.

(b) In general, Enforcement Letters communicate DOE's expectations with respect to any aspect of the requirements contained in the Department's nuclear safety rules, including identification and reporting of issues, corrective actions, and implementation of the contractor's nuclear safety program. DOE might, for example, wish to recognize some action of the contractor that is of particular benefit to nuclear safety performance that is a candidate for emulation by other contractors. On the other hand, DOE may wish to bring a program shortcoming to the attention of the contractor that, but for the lack of nuclear safety significance of the immediate issue, might have resulted in the issuance of a PNOV. An Enforcement Letter is not an enforcement action.

(c) With respect to many noncompliances, DOE may decide not to send an Enforcement Letter. When DOE decides that a contractor has appropriately corrected a noncompliance or that the significance of the noncompliance is sufficiently low, it may close out its review simply through an annotation in the DOE Noncompliance Tracking System (NTS). A closeout of a noncompliance with or without an Enforcement Letter may only take place after DOE has confirmed that corrective actions have been completed. Closeout of any NNSA contractor noncompliance will be coordinated with NNSA prior to closeout.

IX. Enforcement Actions

a. This section describes the enforcement sanctions available to DOE and specifies the conditions under which each may be used. The basic sanctions are Notices of Violation and civil penalties. In determining whether to impose enforcement sanctions, DOE will consider enforcement actions taken by other Federal or State regulatory bodies having concurrent jurisdiction, e.g., instances which involve NRC licensed entities which are also DOE contractors, and in which the NRC exercises its own enforcement authority.

b. The nature and extent of the enforcement action is intended to reflect the seriousness of the violation involved. For the vast majority of violations for which DOE assigns severity levels as described previously, a Notice of Violation will be issued, requiring a formal response from the recipient describing the nature of and schedule for corrective actions it intends to take regarding the violation. Administrative actions, such as determination of award fees where DOE contracts provide for such determinations, will be considered separately from any civil penalties that may be imposed under this Enforcement Policy. Likewise, imposition of a civil penalty will be based on the circumstances of each case, unaffected by any award fee determination.

1. Notice of Violation

a. A Notice of Violation (either a Preliminary or Final Notice) is a document setting forth the conclusion of the DOE Office of Nuclear Safety and Environment that one or more violations of DOE Nuclear Safety Requirements has occurred. Such a notice normally requires the recipient to provide a written response which may take one of several positions described in Section V of this policy statement. In the event that the recipient concedes the occurrence of the violation, it is required to describe corrective steps which have been taken and the results achieved; remedial actions which will be taken to prevent recurrence; and the date by which full compliance will be achieved.

b. DOE will use the Notice of Violation as the standard method for formalizing the existence of a violation and, in appropriate cases as described in this section, the notice of violation will be issued in conjunction with the proposed imposition of a civil penalty. In certain limited instances, as described in this section, DOE may refrain from the issuance of an otherwise appropriate Notice of Violation. However, a Notice of Violation will virtually always be issued for willful violations, if past corrective actions for similar violations have not been sufficient to prevent recurrence and there are no other mitigating circumstances, or if the circumstances otherwise warrant increasing Severity Level III violations to a higher severity level.

c. DOE contractors are not ordinarily cited for violations resulting from matters not within their control, such as equipment failures that were not avoidable by reasonable quality assurance measures, proper maintenance, or management controls. With regard to the issue of funding, however, DOE does not consider an asserted lack of funding to be a justification for noncompliance with DOE Nuclear Safety Requirements.

Should a contractor believe that a shortage of funding precludes it from achieving compliance with one or more DOE Nuclear Safety Requirements, it must pursue one of two alternative courses of action. First, it may request, in writing, an exemption from the requirement(s) in question from the appropriate Secretarial Officer (SO), explicitly addressing the criteria for exemptions set forth in 10 CFR 820.62. A justification for continued operation for the period during which the exemption request is being considered should also be submitted. In such a case, the SO must grant or deny the request in writing, explaining the rationale for the decision. Second, if the criteria for approval of an exemption cannot be demonstrated, the contractor, in conjunction with the SO, must take appropriate steps to modify, curtail, suspend or cease the activities which cannot be conducted in compliance with the DOE Nuclear Safety Requirement(s) in question.

d. DOE expects the contractors which operate its facilities to have the proper management and supervisory systems in place to assure that all activities at DOE facilities, regardless of who performs them, are carried out in compliance with all DOE Nuclear Safety Requirements. Therefore, contractors are normally held responsible for the acts of their employees and subcontractor employees in the conduct of activities at DOE facilities. Accordingly, this policy should not be construed to excuse personnel errors.

e. Finally, certain contractors are explicitly exempted from the imposition of civil penalties pursuant to the provisions of the PAAA, 42 U.S.C. 2282a(d), for activities conducted at specified facilities. See 10 CFR 820.20(c). In addition, in fairness to non-profit educational institutions, the Department has determined that they should be likewise exempted. See 10 CFR 820.20(d). However, compliance with DOE Nuclear Safety Requirements is no less important for these facilities than for other facilities in the DOE complex which work with, store or dispose of radioactive materials. Indeed, the exempted contractors conduct some of the most important nuclear-related research and development activities performed for the Department. Therefore, in order to serve the purposes of this enforcement policy and to emphasize the importance the Department places on compliance with all of its nuclear safety requirements, DOE intends to issue Notices of Violation to the exempted contractors and non-profit educational institutions when appropriate under this policy statement, notwithstanding the statutory and regulatory exemptions from the imposition of civil penalties.

2. Civil Penalty

a. A civil penalty is a monetary penalty that may be imposed for violations of applicable DOE Nuclear Safety Requirements, including Compliance Orders. See 10 CFR 820.20(b). Civil penalties are designed to emphasize the need for lasting remedial action, deter future violations, and underscore the importance of DOE contractor self-identification, reporting and correction of violations of DOE Nuclear Safety Requirements.

b. Absent mitigating circumstances as described below, or circumstances otherwise warranting the exercise of enforcement discretion by DOE as described in this section, civil penalties will be proposed for Severity Level I and II violations. Civil penalties will be proposed for Severity Level III violations which are similar to previous violations for which the contractor did not take effective corrective action. “Similar” violations are those which could reasonably have been expected to have been prevented by corrective action for the previous violation. DOE normally considers civil penalties only for similar Severity Level III violations that occur over a reasonable period of time to be determined at the discretion of DOE.

c. DOE will impose different base level civil penalties considering the severity level of the violation(s) by Price-Anderson indemnified contractors. Table 1 shows the daily base civil penalties for the various categories of severity levels. However, as described above in Section IV, the imposition of civil penalties will also take into account the gravity, circumstances, and extent of the violation or violations and, with respect to the violator, any history of prior similar violations and the degree of culpability and knowledge.

d. Regarding the factor of ability of DOE contractors to pay the civil penalties, it is not DOE's intention that the economic impact of a civil penalty be such that it puts a DOE contractor out of business. Contract termination, rather than civil penalties, is used when the intent is to terminate these activities. The deterrent effect of civil penalties is best served when the amount of such penalties takes this factor into account. However, DOE will evaluate the relationship of affiliated entities to the contractor (such as parent corporations) when it asserts that it cannot pay the proposed penalty.

e. DOE will review each case involving a proposed civil penalty on its own merits and adjust the base civil penalty values upward or downward appropriately. As indicated above, Table 1 identifies the daily base civil penalty values for different severity levels. After considering all relevant circumstances, civil penalties may be escalated or mitigated based upon the adjustment factors described below in this section. In no instance will a civil penalty for any one violation exceed the statutory limit, as periodically adjusted for inflation as required by law. However, it should be emphasized that if the DOE contractor is or should have been aware of a violation and has not reported it to DOE and taken corrective action despite an opportunity to do so, each day the condition existed may be considered as a separate violation and, as such, subject to a separate civil penalty. Further, as described in this section, the duration of a violation will be taken into account in determining the appropriate severity level of the base civil penalty.

Table 1—Severity Level Base Civil Penalties

Severity level | Base civil penalty amount (percentage of maximum civil penalty per violation per day)

I | 100

II | 50

III | 10

3. Adjustment Factors

a. DOE's enforcement program is not an end in itself, but a means to achieve compliance with DOE Nuclear Safety Requirements, and civil penalties are not collected to swell the coffers of the United States Treasury, but to emphasize the importance of compliance and to deter future violations. The single most important goal of the DOE enforcement program is to encourage early identification and reporting of nuclear safety deficiencies and violations of DOE Nuclear Safety Requirements by the DOE contractors themselves rather than by DOE, and the prompt correction of any deficiencies and violations so identified. DOE believes that DOE contractors are in the best position to identify and promptly correct noncompliance with DOE Nuclear Safety Requirements. DOE expects that these contractors should have in place internal compliance programs which will ensure the detection, reporting and prompt correction of nuclear safety-related problems that may constitute, or lead to, violations of DOE Nuclear Safety Requirements before, rather than after, DOE has identified such violations. Thus, DOE contractors will almost always be aware of nuclear safety problems before they are discovered by DOE. Obviously, public and worker health and safety is enhanced if deficiencies are discovered (and promptly corrected) by the DOE contractor, rather than by DOE, which may not otherwise become aware of a deficiency until later on, during the course of an inspection, performance assessment, or following an incident at the facility. Early identification of nuclear safety-related problems by DOE contractors has the added benefit of allowing information which could prevent such problems at other facilities in the DOE complex to be shared with all appropriate DOE contractors.

b. Pursuant to this enforcement philosophy, DOE will provide substantial incentive for the early self-identification, reporting and prompt correction of problems which constitute, or could lead to, violations of DOE Nuclear Safety Requirements. Thus, application of the adjustment factors set forth below may result in no civil penalty being assessed for violations that are identified, reported, and promptly and effectively corrected by the DOE contractor.

c. On the other hand, ineffective programs for problem identification and correction are unacceptable. Thus, for example, where a contractor fails to disclose and promptly correct violations of which it was aware or should have been aware, substantial civil penalties are warranted and may be sought, including the assessment of civil penalties for continuing violations on a per day basis.

d. Further, in cases involving willfulness, flagrant DOE-identified violations, repeated poor performance in an area of concern, or serious breakdown in management controls, DOE intends to apply its full statutory enforcement authority where such action is warranted.

4. Identification and Reporting

Reduction of up to 50% of the base civil penalty shown in Table 1 may be given when a DOE contractor identifies the violation and promptly reports the violation to the DOE. In weighing this factor, consideration will be given to, among other things, the opportunity available to discover the violation, the ease of discovery and the promptness and completeness of any required report. No consideration will be given to a reduction in penalty if the DOE contractor does not take prompt action to report the problem to DOE upon discovery, or if the immediate actions necessary to restore compliance with DOE Nuclear Safety Requirements or place the facility or operation in a safe configuration are not taken.

5. Self-Identification and Tracking Systems

a. DOE strongly encourages contractors to self-identify noncompliances with DOE Nuclear Safety Requirements before the noncompliances lead to a string of similar and potentially more significant events or consequences. When a contractor identifies a noncompliance through its own self-monitoring activity, DOE will normally allow a reduction in the amount of civil penalties, regardless of whether prior opportunities existed for contractors to identify the noncompliance. DOE will normally not allow a reduction in civil penalties for self-identification if significant DOE intervention was required to induce the contractor to report a noncompliance.

b. Self-identification of a noncompliance is possibly the single most important factor in considering a reduction in the civil penalty amount. Consideration of self-identification is linked to, among other things, whether prior opportunities existed to discover the violation, and if so, the age and number of such opportunities; the extent to which proper contractor controls should have identified or prevented the violation; whether discovery of the violation resulted from a contractor's self-monitoring activity; the extent of DOE involvement in discovering the violation or in prompting the contractor to identify the violation; and the promptness and completeness of any required report. Self-identification is also considered by DOE in deciding whether to pursue an investigation.

c. DOE has established a voluntary Noncompliance Tracking System (NTS) which allows contractors to elect to report noncompliances. In the guidance document supporting the NTS (DOE-HDBK-1089-95), DOE has established reporting thresholds for reporting items of noncompliance of potentially greater safety significance into the NTS. Contractors may, however, use their own self-tracking systems to track noncompliances below the reporting threshold. This self-tracking is considered to be acceptable self-reporting as long as DOE has access to the contractor's system and the contractor's system notes the item as a noncompliance with a DOE Nuclear Safety Requirement. For noncompliances that are below the reportability thresholds, DOE will credit contractor self-tracking as representing self-reporting. If an item is not reported in NTS but only tracked in the contractor's system and DOE subsequently finds the facts and their safety significance have been significantly mischaracterized, DOE will not credit the internal tracking as representing appropriate self-reporting.

6. Self-Disclosing Events

a. DOE expects contractors to demonstrate acceptance of responsibility for safety of the public, workers, and the environment and to proactively identify noncompliance conditions in their programs and processes. In deciding whether to reduce any civil penalty proposed for violations revealed by the occurrence of a self-disclosing event, DOE will consider the ease with which a contractor could have discovered the noncompliance and the prior opportunities that existed to discover the noncompliance. When the occurrence of an event discloses noncompliances that the contractor could have or should have identified before the event, DOE will not generally allow a reduction in civil penalties for self-identification, even if the underlying noncompliances were reported to DOE. If a contractor simply reacts to events that disclose potentially significant consequences or downplays noncompliances which did not result in significant consequences to workers, the public, and the environment, such contractor actions do not lead to the improvement in nuclear safety contemplated by the Act.

b. The key test is whether the contractor reasonably could have detected any of the underlying noncompliances that contributed to the event. Examples of events that provide opportunities to identify noncompliances include, but are not limited to:

(1) prior notifications of potential problems such as those from DOE operational experience publications or vendor equipment deficiency reports;

(2) normal surveillance, quality assurance assessments, and post-maintenance testing;

(3) readily observable parameter trends; and

(4) contractor employee or DOE observations of potential safety problems. Failure to utilize these types of events and activities to address noncompliances may result in higher civil penalty assessments or a DOE decision not to reduce civil penalty amounts.

c. For example, a critique of the event might find that one of the root causes was a lack of clarity in a Radiation Work Permit (RWP) which led to improper use of anti-contamination clothing and resulting uptake of contamination by the individual. DOE could subsequently conclude that no reduction in civil penalties for self-identification should be allowed since the event itself disclosed the inadequate RWP and the contractor could have, through proper independent assessment or by fostering a questioning attitude by its workers and supervisors, identified the inadequate RWP before the event.

d. Alternatively, if, following a self-disclosing event, DOE found that the contractor's processes and procedures were adequate and the contractor's personnel generally behaved in a manner consistent with the contractor's processes and procedures, DOE could conclude that the contractor could not have been reasonably expected to find the single procedural noncompliance that led to the event and thus, might allow a reduction in civil penalties.

7. Corrective Action To Prevent Recurrence

The promptness (or lack thereof) and extent to which the DOE contractor takes corrective action, including actions to identify root cause and prevent recurrence, may result in up to a 50% increase or decrease in the base civil penalty shown in Table 1. For example, very extensive corrective action may result in reducing the proposed civil penalty as much as 50% of the base value shown in Table 1. On the other hand, the civil penalty may be increased as much as 50% of the base value if initiation or corrective action is not prompt or if the corrective action is only minimally acceptable. In weighing this factor, consideration will be given to, among other things, the appropriateness, timeliness and degree of initiative associated with the corrective action. The comprehensiveness of the corrective action will also be considered, taking into account factors such as whether the action is focused narrowly to the specific violation or broadly to the general area of concern.

8. DOE's Contribution to a Violation

There may be circumstances in which a violation of a DOE Nuclear Safety Requirement results, in part or entirely, from a direction given by DOE personnel to a DOE contractor to either take, or forbear from taking an action at a DOE facility. In such cases, DOE may refrain from issuing an NOV, and may mitigate, either partially or entirely, any proposed civil penalty, provided that the direction upon which the DOE contractor relied is documented in writing, contemporaneously with the direction. It should be emphasized, however, that pursuant to 10 CFR 820.50, no interpretation of a DOE Nuclear Safety Requirement is binding upon DOE unless issued in writing by the General Counsel. Further, as discussed in this section of this policy statement, lack of funding by itself will not be considered as a mitigating factor in enforcement actions.

9. Exercise of Discretion

Because DOE wants to encourage and support DOE contractor initiative for prompt self-identification, reporting and correction of problems, DOE may exercise discretion as follows:

a. In accordance with the previous discussion, DOE may refrain from issuing a civil penalty for a violation which meets all of the following criteria:

(1) The violation is promptly identified and reported to DOE before DOE learns of it.

(2) The violation is not willful or a violation that could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation.

(3) The DOE contractor, upon discovery of the violation, has taken or begun to take prompt and appropriate action to correct the violation.

(4) The DOE contractor has taken, or has agreed to take, remedial action satisfactory to DOE to preclude recurrence of the violation and the underlying conditions which caused it.

b. DOE may refrain from proposing a civil penalty for a violation involving a past problem, such as in engineering design or installation, that meets all of the following criteria:

(1) It was identified by a DOE contractor as a result of a formal effort such as a Safety System Functional Inspection, Design Reconstitution program, or other program that has a defined scope and timetable which is being aggressively implemented and reported;

(2) Comprehensive corrective action has been taken or is well underway within a reasonable time following identification; and

(3) It was not likely to be identified by routine contractor efforts such as normal surveillance or quality assurance activities.

c. DOE will not issue a Notice of Violation for cases in which the violation discovered by the DOE contractor cannot reasonably be linked to the conduct of that contractor in the design, construction or operation of the DOE facility involved, provided that prompt and appropriate action is taken by the DOE contractor upon identification of the past violation to report to DOE and remedy the problem.

d. DOE may refrain from issuing a Notice of Violation for an item of noncompliance that meets all of the following criteria:

(1) It was promptly identified by the DOE nuclear entity;

(2) It is normally classified at a Severity Level III;

(3) It was promptly reported to DOE;

(4) Prompt and appropriate corrective action will be taken, including measures to prevent recurrence; and

(5) It was not a willful violation or a violation that could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation.

e. DOE may refrain from issuing a Notice of Violation for an item of noncompliance that meets all of the following criteria:

(1) It was an isolated Severity Level III violation identified during a Tiger Team inspection conducted by the Office of Health, Safety and Security during an inspection or integrated performance assessment conducted by the Office of Nuclear Safety and Environment, or during some other DOE assessment activity.

(2) The identified noncompliance was properly reported by the contractor upon discovery.

(3) The contractor initiated or completed appropriate assessment and corrective actions within a reasonable period, usually before the termination of the onsite inspection or integrated performance assessment.

(4) The violation is not willful or one which could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation.

f. In situations where corrective actions have been completed before termination of an inspection or assessment, a formal response from the contractor is not required and the inspection or integrated performance assessment report serves to document the violation and the corrective action. However, in all instances, the contractor is required to report the noncompliance through established reporting mechanisms so the noncompliance issue and any corrective actions can be properly tracked and monitored.

g. If DOE initiates an enforcement action for a violation at a Severity Level II or III and, as part of the corrective action for that violation, the DOE contractor identifies other examples of the violation with the same root cause, DOE may refrain from initiating an additional enforcement action. In determining whether to exercise this discretion, DOE will consider whether the DOE contractor acted reasonably and in a timely manner appropriate to the safety significance of the initial violation, the comprehensiveness of the corrective action, whether the matter was reported, and whether the additional violation(s) substantially change the safety significance or character of the concern arising out of the initial violation.

h. It should be emphasized that the preceding paragraphs are solely intended to be examples indicating when enforcement discretion may be exercised to forego the issuance of a civil penalty or, in some cases, the initiation of any enforcement action at all. However, notwithstanding these examples, a civil penalty may be proposed or Notice of Violation issued when, in DOE's judgment, such action is warranted on the basis of the circumstances of an individual case.

X. Procurement of Products or Services and the Reporting of Defects

(a) DOE's enforcement policy is also applicable to subcontractors and suppliers to DOE Price-Anderson indemnified contractors. Through procurement contracts with these DOE contractors, subcontractors and suppliers are generally required to have quality assurance programs that meet applicable DOE Nuclear Safety Requirements. Suppliers of products or services provided in support of or for use in DOE facilities operated by Price-Anderson indemnified contractors are subject to certain requirements designed to ensure the high quality of the products or services supplied to DOE facilities that could, if deficient, adversely affect public or worker safety. DOE regulations require that DOE be notified whenever a DOE contractor obtains information reasonably indicating that a DOE facility (including its structures, systems and components) which conducts activities subject to the provisions of the Atomic Energy Act of 1954, as amended or DOE Nuclear Safety Requirements either fails to comply with any provision of the Atomic Energy Act or any applicable DOE Nuclear Safety Requirement, or contains a defect or has been supplied with a product or service which could create or result in a substantial safety hazard.

(b) DOE will conduct audits and assessments of its contractors to determine whether they are ensuring that subcontractors and suppliers are meeting their contractual obligations with regard to quality of products or services that could have an adverse effect on public or worker radiological safety, and ensure that DOE contractors have in place adequate programs to determine whether products or services supplied to them for DOE facilities meet applicable DOE requirements and that substandard products or services are not used by Price-Anderson indemnified contractors at the facilities they operate for DOE. As part of the effort of ensuring that contractual and regulatory requirements are met, DOE may also audit or assess subcontractors and suppliers. These assessments could include examination of the quality assurance programs and their implementation by the subcontractors and suppliers through examination of product quality.

(c) When audits or assessments determine that subcontractors or suppliers have failed to comply with applicable DOE Nuclear Safety Requirements or to fulfill contractual commitments designed to ensure the quality of a safety significant product or service, enforcement action will be taken. Notices of Violations and civil penalties will be issued, as appropriate, for DOE contractor failures to ensure that their subcontractors and suppliers provide products and services that meet applicable DOE requirements. Notices of Violations and civil penalties will also be issued to subcontractors and suppliers of DOE contractors which fail to comply with the reporting requirements set forth in any other applicable DOE Nuclear Safety Requirements.

XI. Inaccurate and Incomplete Information

(a) A violation of DOE Nuclear Safety Requirements for failure to provide complete and accurate information to DOE, 10 CFR 820.11, can result in the full range of enforcement sanctions, depending upon the circumstances of the particular case and consideration of the factors discussed in this section. Violations involving inaccurate or incomplete information or the failure to provide significant information identified by a DOE contractor normally will be categorized based on the guidance in section VI, “Severity of Violations”.

(b) DOE recognizes that oral information may in some situations be inherently less reliable than written submittals because of the absence of an opportunity for reflection and management review. However, DOE must be able to rely on oral communications from officials of DOE contractors concerning significant information. In determining whether to take enforcement action for an oral statement, consideration will be given to such factors as

(b)(1) The degree of knowledge that the communicator should have had regarding the matter in view of his or her position, training, and experience;

(b)(2) The opportunity and time available prior to the communication to assure the accuracy or completeness of the information;

(b)(3) The degree of intent or negligence, if any, involved;

(b)(4) The formality of the communication;

(b)(5) The reasonableness of DOE reliance on the information;

(b)(6) The importance of the information that was wrong or not provided; and

(b)(7) The reasonableness of the explanation for not providing complete and accurate information.

(c) Absent gross negligence or willfulness, an incomplete or inaccurate oral statement normally will not be subject to enforcement action unless it involves significant information provided by an official of a DOE contractor. However, enforcement action may be taken for an unintentionally incomplete or inaccurate oral statement provided to DOE by an official of a DOE contractor or others on behalf of the DOE contractor, if a record was made of the oral information and provided to the DOE contractor thereby permitting an opportunity to correct the oral information, such as if a transcript of the communication or meeting summary containing the error was made available to the DOE contractor and was not subsequently corrected in a timely manner.

(d) When a DOE contractor has corrected inaccurate or incomplete information, the decision to issue a citation for the initial inaccurate or incomplete information normally will be dependent on the circumstances, including the ease of detection of the error, the timeliness of the correction, whether DOE or the DOE contractor identified the problem with the communication, and whether DOE relied on the information prior to the correction. Generally, if the matter was promptly identified and corrected by the DOE contractor prior to reliance by DOE, or before DOE raised a question about the information, no enforcement action will be taken for the initial inaccurate or incomplete information. On the other hand, if the misinformation is identified after DOE relies on it, or after some question is raised regarding the accuracy of the information, then some enforcement action normally will be taken even if it is in fact corrected.

(e) If the initial submission was accurate when made but later turns out to be erroneous because of newly discovered information or advance in technology, a citation normally would not be appropriate if, when the new information became available, the initial submission was corrected.

(f) The failure to correct inaccurate or incomplete information that the DOE contractor does not identify as significant normally will not constitute a separate violation. However, the circumstances surrounding the failure to correct may be considered relevant to the determination of enforcement action for the initial inaccurate or incomplete statement. For example, an unintentionally inaccurate or incomplete submission may be treated as a more severe matter if a DOE contractor later determines that the initial submission was in error and does not correct it or if there were clear opportunities to identify the error.

XII. Secretarial Notification and Consultation

The Secretary will be provided written notification of all enforcement actions involving proposed civil penalties. The Secretary will be consulted prior to taking action in the following situations:

a. Proposals to impose civil penalties in an amount equal to or greater than the statutory limit, as periodically adjusted for inflation as required by law;

b. Any proposed enforcement action that involves a Severity Level I violation;

c. Any action the Director believes warrants the Secretary's involvement; or

d. Any proposed enforcement action on which the Secretary asks to be consulted.

XIII. Whistleblower Enforcement Policy

a. DOE contractors may not retaliate against any employee because the employee has taken any actions listed in 10 CFR 708.5(a) through(c), including disclosing information, participating in proceedings, or refusing to participate in certain activities. DOE contractor employees may seek relief for allegations of retaliation through one of several mechanisms, including filing a complaint with DOE pursuant to 10 CFR part 708 (part 708), the Department of Labor (DOL) under sec. 211 of the Energy Reorganization Act (sec. 211), implemented in 29 CFR part 24, or the DOE Inspector General (IG).

b. An act of retaliation by a DOE contractor, prohibited by 10 CFR 708.43, that results from a DOE contractor employee's involvement in an activity listed in 10 CFR 708.5(a) through (c), may constitute a violation of a DOE Nuclear Safety Requirement under 10 CFR part 820 if it concerns nuclear safety. To avoid the potential for inconsistency with one of the mechanisms available to an aggrieved DOE contractor employee alleging retaliation referenced in section XIII.a, the Director will not take any action under this part with respect to an alleged violation of 10 CFR 708.43 until a request for relief under one of these mechanisms, if any, has been fully adjudicated, including appeals. With respect to an alleged retaliation, the Director will generally only take action that is consistent with the findings of a final decision of an agency or court. If a final decision finds that retaliation occurred, the Department will consider whether that retaliation constitutes a violation of § 708.43, and if so, whether to take action under part 820. If a final decision finds that no retaliation occurred, the Director will generally not take any action under part 820 with respect to the alleged retaliation absent significant new information that was not available in the prior proceeding. If a final decision dismisses a complaint on procedural grounds without explicitly finding that retaliation did not occur, the Director may take further action under part 820 that is not inconsistent with the final decision.

c. DOE encourages its contractors to cooperate in resolving whistleblower complaints raised by contractor employees in a prompt and equitable manner. Accordingly, in considering what remedy is appropriate for an act of retaliation concerning nuclear safety, the Director will take into account the extent to which a contractor cooperated in proceedings for remedial relief.

d. In considering what remedy is appropriate for an act of retaliation concerning nuclear safety, the Director will also consider the egregiousness of the particular case including the level of management involved in the alleged retaliation and the specificity of the acts of retaliation.

e. When the Director undertakes an investigation of an allegation of DOE contractor retaliation against an employee under part 820, the Director will apprise persons interviewed and interested parties that the investigative activity is being taken pursuant to the nuclear safety procedures of part 820 and not pursuant to the procedures of part 708.

[58 FR 43692, Aug. 17, 1993, as amended at 62 FR 52481, Oct. 8, 1997; 65 FR 15220, Mar. 22, 2000; 71 FR 68732, Nov. 28, 2006; 72 FR 31921, June 8, 2007; 81 FR 41794, June 28, 2016; 81 FR 94914, Dec. 27, 2016]

PART 821 IMPLEMENTING VOLUNTARY AGREEMENTS UNDER THE DEFENSE PRODUCTION ACT

Authority: 42 U.S.C. 2201; 50 U.S.C. 4558; Executive Order 13603; Executive Order 14302.

Source: 90 FR 41283, Aug. 25, 2025, unless otherwise noted.

§ 821.1 General provisions.

(a) General applicability.

(1) Pursuant to section 708 of the Defense Production Act of 1950, as amended (50 U.S.C. 4558), the Secretary of Energy (or the appropriate official identified under 50 U.S.C. 4558(c)(2)), as delegated by the President, may consult with representatives of industry, business, financing, agriculture, labor, or other interests, and may approve the making of voluntary agreements and plans of action to help provide for the defense of the United States by developing preparedness programs and expanding productive capacity and supply beyond levels needed to help provide for the national defense.

(2) Implementation of this part shall conform to the provisions provided under section 708 of the Defense Production Act (DPA) of 1950, as amended (50 U.S.C. 4558).

(b) Secretary of Energy (or the appropriate delegated Department of Energy official).

(1) As used in this part, Secretary of Energy (or the appropriate delegated Department of Energy official) is the Secretary of Energy or a Department of Energy official who is delegated with the responsibility of overseeing a voluntary agreement who, pursuant to a delegation or redelegation of the functions given to the President by section 708 of the Defense Production Act of 1950, as amended, proposes or otherwise provides for the development or carrying out of a voluntary agreement and plans of action.

(2) In the context of energy-related issues, the use of voluntary agreements and plans of action, as authorized by section 708 of the DPA to help provide for the defense of the United States through the development of preparedness programs, is an activity coordinated by the Secretary of Energy (or the appropriate delegated Department of Energy official), as provided by Executive Order 13603, Section 403 and Executive Order 14302, Section 3.

(3) The Secretary of Energy (or the appropriate delegated Department of Energy official) shall carry out functions overseeing a voluntary agreement and plan of action.

(c) Implementation. This part applies to the development and carrying out under section 708 of the DPA, as amended, of all voluntary agreements and plans of action developed with domestic nuclear energy companies pursuant to the Secretary's authority under Executive Order 13603, Section 403.

(d) Rules. The rules in this part void any provision of a voluntary agreement to which they apply, if that provision is contrary to or inconsistent with them. Each voluntary agreement shall be construed as containing every substantive provision that these rules require, whether or not a particular provision is included in the agreement.

(e) Commencement of agreements.

(1) A voluntary agreement or plan of action may not become effective unless and until—

(i) The Secretary of Energy (or the appropriate delegated Department of Energy official) approves the voluntary agreement or plan of action and certifies, in writing, that the agreement or plan is necessary to carry out the purposes of section 708(c)(1) of the DPA and submits a copy of such agreement to the Congress; and

(ii) The Attorney General (after consultation with the Chairman of the Federal Trade Commission) finds, in writing, that such purpose may not reasonably be achieved through a voluntary agreement or plan of action having less anticompetitive effects or without any voluntary agreement or plan of action and publishes such finding in the Federal Register.

(2) Each voluntary agreement or plan of action that becomes effective under paragraph (e)(1) of this section shall expire 5 years after the date it becomes effective (and at 5-year intervals thereafter, as the case may be), unless (immediately prior to such expiration date) the Secretary of Energy (or the appropriate delegated Department of Energy official) and the Attorney General (after consultation with the Chairman of the Federal Trade Commission) make the certification or finding, as the case may be, described in paragraph (e)(1) of this section with respect to such voluntary agreement or plan of action and publish such certification or finding in the Federal Register, in which case, the voluntary agreement or plan of action may be extended for an additional period of 5 years.

(f) Advisory committees.

(1) Pursuant to section 708(d) of the DPA, the Secretary of Energy (or the appropriate delegated Department of Energy official) may establish such advisory committees as deemed to be necessary for developing or carrying out voluntary agreements or plans of action. The Attorney General and the Federal Trade Commission shall have adequate advance notice of any meeting and may have an official representative attend and participate in any such meeting. A full and complete verbatim transcript shall be kept of such advisory committee meetings, and shall be taken and deposited, together with any agreement resulting therefrom, with the Attorney General and the Federal Trade Commission. Such transcript and agreement shall be made available for public inspection and copying subject to the exemptions from disclosure provided under 5 U.S.C. 552(b)(1), (3), and (4). Such advisory committees shall comply with this part as well as with the requirements and procedures of the Federal Advisory Committee Act (Pub. L. 92-463, as amended).

(2) Notwithstanding any other provision of law, consistent with section 708(n) of the Defense Production Act of 1950 (50 U.S.C. 4558(n)), chapter 10 of Title 5 and any other provision of Federal law relating to advisory committees shall not apply to—

(i) the consultations referred to in 50 U.S.C. 4558(c)(1); or

(ii) any activity conducted under a voluntary agreement or plan of action approved pursuant to this section that complies with the requirements of 50 U.S.C. 4558 and this part.

(h) Plan of action. The term “plan of action” means any of 1 or more documented methods adopted by participants in an existing voluntary agreement to implement that agreement.

(i) Antitrust laws. The term “antitrust laws” has the same meaning given in 50 U.S.C. 4558(b)(1).

(j) Petitions. Interested persons may petition the Secretary of Energy for the issuance, amendment, or repeal of this rule.

§ 821.2 Prerequisites for agreements and plans of action.

(a) Finding by the President. Upon a finding by the President that conditions exist which may pose a direct threat to the national defense or its preparedness programs, the Secretary (or the appropriate delegated Department of Energy official) may consult with representatives of industry, business, financing, agriculture, labor, and other interests in order to provide for the making by such persons, with the approval of the Secretary (or the appropriate delegated Department of Energy official), of voluntary agreements and plans of action to help provide for the national defense.

(b) The Secretary and other Senate-confirmed appointees. The Secretary (or the appropriate delegated Department of Energy official) may engage in the activities described in paragraph (a) of this section so long as they:

(1) Are individuals who are appointed by and with the advice and consent of the Senate, or are holding offices to which they have been appointed by and with the advice and consent of the Senate;

(2) Consult with the Attorney General and with the Federal Trade Commission not less than ten days before consulting with any persons under paragraph (a) of this section; and

(3) Upon the condition that such individuals obtain the prior approval of the Attorney General, after consultation by the Attorney General with the Federal Trade Commission, to consult under paragraph (a) of this section.

(c) Delegations.

(1) The Secretary (or the appropriate delegated Department of Energy official) may further delegate tasks in developing voluntary agreements to an appropriate DOE officer working under the supervision of the Secretary (or the appropriate delegated Department of Energy official).

(2) The meetings held to develop the voluntary agreements shall be chaired by an individual as identified in paragraph (b) of this section and 50 U.S.C. 4558(c)(2) or by that person's delegate.

§ 821.3 Developing voluntary agreements and plans of action.

(a) Purpose and scope. This section establishes the standards and procedures by which voluntary agreements and plans of action may be developed through consultation, pursuant to section 708(c) of the Defense Production Act (DPA) of 1950.

(b) Proposal to develop an agreement.

(1) In cases where the Secretary of Energy (or the appropriate delegated Department of Energy official) wishes to develop a voluntary agreement or plan of action after conducting meetings also attended by the Attorney General (or the Attorney General's delegate) and the Chairman of the Federal Trade Commission (or the Chairman's delegate) to discuss the development of a voluntary agreement or plan of action, the Secretary of Energy (or the appropriate delegated Department of Energy official) shall submit to the Attorney General a document proposing the agreement. The proposal will include statements as to: The purpose of the agreement or plan of action; the factual basis for making the finding required in section 708(c)(1) of the DPA; the proposed participants in the agreement or plan of action; and any coordination with other Federal agencies accomplished in connection with the proposal.

(2) If the Attorney General, after consultation with the Chairman of the Federal Trade Commission, approves this proposal, the Secretary of Energy (or the appropriate delegated Department of Energy official) shall then initiate one or more meetings of interested persons to develop the agreement or plan of action.

(c) Conduct of meetings held to develop the agreement or plan of action.

(1) The parties participating in any voluntary agreement or plan of action shall provide to the Secretary of Energy (or the appropriate delegated Department of Energy official), the Attorney General, and the Chairman of the Federal Trade Commission adequate written notice of time, place, and nature of each meeting to develop a voluntary agreement. The Secretary of Energy (or the appropriate delegated Department of Energy official) shall also publish in the Federal Register notice of the time, place, and nature of each meeting at least seven days prior to the meeting.

(2) The Secretary of Energy (or the appropriate delegated Department of Energy official) shall chair each meeting held to develop a voluntary agreement. Both the Attorney General and the Chairman of the Federal Trade Commission, or their delegates, shall attend each of these meetings.

(3) Any interested person may attend a meeting held to develop a voluntary agreement, unless the Secretary of Energy (or the appropriate delegated Department of Energy official) limits attendance pursuant to § 821.6 of this part.

(4) Any interested person may, as set out in the relevant Federal Register meeting notice, submit written data and views concerning the proposed voluntary agreement, and at the discretion of the Chairman of the meeting, may be given the opportunity for oral presentation.

(d) Maintenance of records.

(1) The Secretary of Energy (or the appropriate delegated Department of Energy official) is responsible for the making of a full and verbatim transcript of each meeting. The Chairman of such meeting shall send this transcript, and any voluntary agreement resulting from the meeting, to the Attorney General, the Chairman of the Federal Trade Commission, the Secretary of Energy (or the appropriate delegated Department of Energy official), and any other party or repository required by law.

(2) The Secretary of Energy (or the appropriate delegated Department of Energy official) shall maintain each meeting transcript and voluntary agreement, and make them available for public inspection and copying to the extent required by § 821.6 of this part.

(e) Effectiveness of agreements. The following steps must occur before a new voluntary agreement or an extension of an existing agreement may become effective:

(1) The Secretary of Energy (or the appropriate delegated Department of Energy official) must approve the agreement and certify in writing that it is necessary to carry out the purposes of section 708(c)(1) of the DPA, submit the agreement and certification to the Attorney General with a request for a written finding, and submit a copy of such agreement or plan to Congress;

(2) The Attorney General, after consulting with the Chairman of the Federal Trade Commission, must issue a written finding that the purposes of section 708(c)(1) of the DPA may not reasonably be achieved through a voluntary agreement having less anti-competitive effects or without any voluntary agreement or plan of action and publishes such finding in the Federal Register.

(3) Each voluntary agreement or plan of action that has become effective shall expire 5 years after the date it becomes effective (and at 5-year intervals thereafter, as the case may be), unless (immediately prior to such expiration date) the Secretary (or the appropriate delegated Department of Energy official) who administers the agreement or plan and the Attorney General (after consultation with the Chairman of the Federal Trade Commission) make the certification or finding, as the case may be, described in paragraphs (e)(1) through (2) of this section with respect to such voluntary agreement or plan of action and publishes such certification or finding in the Federal Register, in which case, the voluntary agreement or plan of action may be extended for an additional period of 5 years.

§ 821.4 Carrying out voluntary agreements.

(a) Purpose and scope. This section establishes the standards and procedures by which the participants in each approved voluntary agreement shall carry out the agreement.

(b) Participants. The participants in each voluntary agreement shall be reasonably representative of the appropriate industry or segment of that industry.

(c) Conduct of meetings held to carry out an agreement.

(1) The Secretary of Energy (or the appropriate delegated Department of Energy official) when overseeing a voluntary agreement shall initiate, or approve in advance, each meeting of the agreement participants held to discuss problems, determine policies, recommend actions, and make decisions necessary to carry out the agreement.

(2) The Secretary of Energy (or the appropriate delegated Department of Energy official) shall provide to the Attorney General and the Chairman of the Federal Trade Commission, and Congress adequate prior notice of the time, place, and nature of each meeting to carry out a voluntary agreement or plan of action, and a proposed agenda of each meeting. The Secretary of Energy (or the appropriate delegated Department of Energy official) shall publish in the Federal Register, reasonably in advance of each meeting to carry out a voluntary agreement or plan of action in accordance with 50 U.S.C. 4558(h)(8), a notice of the time, place, and nature of the meeting. If the Secretary of Energy (or the appropriate delegated Department of Energy official) has determined, pursuant to § 821.6 of this part, to limit attendance at the meeting, the Secretary of Energy (or the appropriate delegated Department of Energy official) shall publish the Federal Register notice within ten days of the meeting.

(3) Any interested person may attend a meeting held to carry out a voluntary agreement unless the Secretary of Energy (or the appropriate delegated Department of Energy official) has restricted attendance pursuant to § 821.6 of this part. A person attending a meeting under this section may present written data, views, and arguments (with or without opportunity for oral presentation) to any limitations on the manner of presentation that the Secretary of Energy (or the appropriate delegated Department of Energy official) may impose.

(4) No meeting shall be held to carry out any voluntary agreement unless a Federal employee, other than an individual employed pursuant to 5 U.S.C. 3109, is in attendance. In addition to the Secretary of Energy (or the appropriate delegated Department of Energy official), any meeting to carry out a voluntary agreement may be attended by the Attorney General, the Chairman of the Federal Trade Commission, the Secretary of Energy, or their delegates.

(5) Participants in any voluntary agreement or plan of action shall provide the Secretary of Energy (or the appropriate delegated Department of Energy official), the Attorney General, and the Chairman of the Federal Trade Commission with adequate prior notice of the time, place, and nature of any meeting to be held to carry out the voluntary agreement or plan of action.

(6) Notwithstanding any other provision of this section, a meeting between a single participant and the Secretary of Energy (or the appropriate delegated Department of Energy official) solely to deliver or exchange information is not subject to the requirements and procedures of this section, provided that a copy of the information is promptly delivered to the Attorney General, the Chairman of the Federal Trade Commission, and the Secretary of Energy (or the appropriate delegated Department of Energy official).

(d) Maintenance of records.

(1) The participants in any voluntary agreement or plan of action shall maintain for five years all minutes of meetings, transcripts, records, documents, and other data, including any communications among themselves or with any other member of their industry, related to the carrying out of the voluntary agreement or plan of action. The participants shall agree, in writing, to make available to the Attorney General, the Chairman of the Federal Trade Commission and the Secretary of Energy (or the appropriate delegated Department of Energy official) for inspection and copying at reasonable times and upon reasonable notice any item that this paragraph (d)(1) requires them to maintain.

(2) Any person required by § 821.4(d)(1) to maintain records shall indicate specific portions, if any, that such person believes should not be disclosed to the public pursuant to § 821.6 of this part, and the reasons therefor. Any item made available to a Government official named in § 821.4.(d)(1) shall be available from that official for public inspection and copying subject to the limitations set forth in § 821.6 of this part.

§ 821.5 Termination or modifying voluntary agreements.

The Attorney General may terminate or modify a voluntary agreement, in writing, after consultation with the Chairman of the Federal Trade Commission and the Secretary of Energy (or the appropriate delegated Department of Energy official). The Secretary of Energy (or the appropriate delegated Department of Energy official) may also terminate or modify a voluntary agreement, in writing, after consultation with the Attorney General and the Chairman of the Federal Trade Commission. Any person who is a party to a voluntary agreement may terminate his participation in the agreement upon written notice to the Secretary of Energy. Effective immediately upon modification or termination of a voluntary agreement or plan of action, any antitrust immunity conferred upon the participants in that voluntary agreement or plan of action by section 708(j) of the Defense Production Act (DPA) of 1950 (50 U.S.C. 4558(j)) shall not apply to any act or omission occurring after the time of such termination or modification.

§ 821.6 Public access to records and meetings.

(a) Interested persons may, pursuant to 5 U.S.C. 552, inspect or copy any voluntary agreement, minutes of meetings, transcripts, records, or other data maintained pursuant to these rules, subject to the exemptions provided under 5 U.S.C. 552(b)(1), (3), or (4).

(b) Except as provided by paragraph (c) of this section, interested persons may attend any part of a meeting held to develop or carry out a voluntary agreement pursuant to these rules.

(c) The Secretary of Energy (or the appropriate delegated Department of Energy official) may withhold material described in this section from disclosure and restrict attendance at meetings only on the grounds specified in 5 U.S.C. 552(b)(1), (3), or (4) or 5 U.S.C. 552b(c), as appropriate.

PART 824 PROCEDURAL RULES FOR THE ASSESSMENT OF CIVIL PENALTIES FOR CLASSIFIED INFORMATION SECURITY VIOLATIONS

Authority: 42 U.S.C. 2201, 2282b, 7101 et seq., 50 U.S.C. 2401 et seq.; 28 U.S.C. 2461 note.

Source: 70 FR 3607, Jan. 26, 2005, unless otherwise noted.

§ 824.1 Purpose and scope.

This part implements subsections a., c., and d. of section 234B. of the Atomic Energy Act of 1954 (the Act), 42 U.S.C. 2282b. Subsection a. provides that any person who has entered into a contract or agreement with the Department of Energy, or a subcontract or subagreement thereto, and who violates (or whose employee violates) any applicable rule, regulations in this chapter, or order under the Act relating to the security or safeguarding of Restricted Data or other classified information, shall be subject to a civil penalty not to exceed $187,668 for each violation. Subsections c. and d. specify certain additional authorities and limitations respecting the assessment of such penalties.

[70 FR 3607, Jan. 26, 2005, as amended at 74 FR 66033, Dec. 14, 2009; 79 FR 19, Jan. 2, 2014; 81 FR 41795, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66083, Dec. 26, 2018; 85 FR 830, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2193, Jan. 13, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024]

§ 824.2 Applicability.

(a) General. These regulations apply to any person that has entered into a contract or agreement with DOE, or a subcontract or sub-agreement thereto.

(b) Limitations. DOE may not assess any civil penalty against any entity (including subcontractors and suppliers thereto) specified at subsection d. of section 234A of the Act until the entity enters, after October 5, 1999, into a new contract with DOE or an extension of a current contract with DOE, and the total amount of civil penalties may not exceed the total amount of fees paid by the DOE to that entity in that fiscal year.

(c) Individual employees. No civil penalty may be assessed against an individual employee of a contractor or any other entity which enters into an agreement with DOE.

[70 FR 3607, Jan. 26, 2005, as amended at 70 FR 8716, Feb. 23, 2005]

§ 824.3 Definitions.

As used in this part:

Act means the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.).

Administrator means the Administrator of the National Nuclear Security Administration.

Classified information means Restricted Data and Formerly Restricted Data protected against unauthorized disclosure pursuant to the Act and National Security Information that has been determined pursuant to Executive Order 12958, as amended March 25, 2003, or any predecessor or successor executive order to require protection against unauthorized disclosure and that is marked to indicate its classified status when in documentary form.

DOE means the United States Department of Energy, including the National Nuclear Security Administration.

Director means the DOE Official, or his or her designee, to whom the Secretary has assigned responsibility for enforcement of this part.

Person means any person as defined in section 11.s. of the Act, 42 U.S.C. 2014, and includes any affiliate or parent corporation thereof, who enters into a contract or agreement with DOE, or is a party to a contract or subcontract under a contract or agreement with DOE.

Secretary means the Secretary of Energy.

§ 824.4 Civil penalties.

(a) Any person who violates a classified information protection requirement of any of the following is subject to a civil penalty under this part:

(1) 10 CFR part 1016—Safeguarding of Restricted Data;

(2) 10 CFR part 1045—Nuclear Classification and Declassification; or

(3) Any other DOE regulation or rule (including any DOE order or manual enforceable against the contractor or subcontractor under a contractual provision in that contractor's or subcontractor's contract) related to the safeguarding or security of classified information if the regulation or rule provides that violation of its provisions may result in a civil penalty pursuant to subsection a. of section 234B. of the Act.

(b) If, without violating a classified information protection requirement of any regulation or rule under paragraph (a) of this section, a person by an act or omission causes, or creates a risk of, the loss, compromise or unauthorized disclosure of classified information, the Secretary may issue a compliance order to that person requiring the person to take corrective action and notifying the person that violation of the compliance order is subject to a notice of violation and assessment of a civil penalty. If a person wishes to contest the compliance order, the person must file a notice of appeal with the Secretary within 15 days of receipt of the compliance order.

(c) The Director may propose imposition of a civil penalty for violation of a requirement of a regulation or rule under paragraph (a) of this section or a compliance order issued under paragraph (b) of this section, not to exceed $187,668 for each violation.

(d) If any violation is a continuing one, each day of such violation shall constitute a separate violation for the purpose of computing the applicable civil penalty.

(e) The Director may enter into a settlement, with or without conditions, of an enforcement proceeding at any time if the settlement is consistent with the objectives of DOE's classified information protection requirements.

[70 FR 3607, Jan. 26, 2005, as amended at 74 FR 66033, Dec. 14, 2009; 79 FR 19, Jan. 2, 2014; 81 FR 41795, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66083, Dec. 26, 2018; 85 FR 830, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2194, Jan. 13, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024]

§ 824.5 Investigations.

The Director may conduct investigations and inspections relating to the scope, nature and extent of compliance by a person with DOE security requirements specified in § 824.4(a) and (b) and take such action as the Director deems necessary and appropriate to the conduct of the investigation or inspection, including signing, issuing and serving subpoenas.

§ 824.6 Preliminary notice of violation.

(a) In order to begin a proceeding to impose a civil penalty under this part, the Director shall notify the person by a written preliminary notice of violation sent by certified mail, return receipt requested, of:

(1) The date, facts, and nature of each act or omission constituting the alleged violation;

(2) The particular provision of the regulation, rule or compliance order involved in each alleged violation;

(3) The proposed remedy for each alleged violation, including the amount of any civil penalty proposed; and,

(4) The right of the person to submit a written reply to the Director within 30 calendar days of receipt of such preliminary notice of violation.

(b) A reply to a preliminary notice of violation must contain a statement of all relevant facts pertaining to an alleged violation. The reply must:

(1) State any facts, explanations and arguments which support a denial of the alleged violation;

(2) Demonstrate any extenuating circumstances or other reason why a proposed remedy should not be imposed or should be mitigated;

(3) Discuss the relevant authorities which support the position asserted, including rulings, regulations, interpretations, and previous decisions issued by DOE;

(4) Furnish full and complete answers to any questions set forth in the preliminary notice; and

(5) Include copies of all relevant documents.

(c) If a person fails to submit a written reply within 30 calendar days of receipt of a preliminary notice of violation:

(1) The person relinquishes any right to appeal any matter in the preliminary notice; and

(2) The preliminary notice, including any remedies therein, constitutes a final order.

(d) The Director, at the request of a person notified of an alleged violation, may extend for a reasonable period the time for submitting a reply or a hearing request letter.

§ 824.7 Final notice of violation.

(a) If a person submits a written reply within 30 calendar days of receipt of a preliminary notice of violation, the Director must make a final determination whether the person violated or is continuing to violate a classified information security requirement.

(b) Based on a determination by the Director that a person has violated or is continuing to violate a classified information security requirement, the Director may issue to the person a final notice of violation that concisely states the determined violation, the amount of any civil penalty imposed, and further actions necessary by or available to the person. The final notice of violation also must state that the person has the right to submit to the Director, within 30 calendar days of the receipt of the notice, a written request for a hearing under § 824.8 or, in the alternative, to elect the procedures specified in section 234A.c.(3) of the Act, 42 U.S.C. 2282a.c.(3).

(c) The Director must send a final notice of violation by certified mail, return receipt requested, within 30 calendar days of the receipt of a reply.

(d) Subject to paragraphs (h) and (i) of this section, the effect of final notice shall be:

(1) If a final notice of violation does not contain a civil penalty, it shall be deemed a final order 15 days after the final notice is issued.

(2) If a final notice of violation contains a civil penalty, the person must submit to the Director within 30 days after the issuance of the final notice:

(i) A waiver of further proceedings;

(ii) A request for an on-the-record hearing under § 824.8; or

(iii) A notice of intent to proceed under section 234A.c.(3) of the Act, 42 U.S.C. 2282a.(c)(3).

(e) If a person waives further proceedings, the final notice of violation shall be deemed a final order enforceable against the person. The person must pay the civil penalty set forth in the notice of violation within 60 days of the filing of waiver unless the Director grants additional time.

(f) If a person files a request for an on-the-record hearing, then the hearing process commences.

(g) If the person files a notice of intent to proceed under section 234A.c.(3) of the Act, 42 U.S.C. 2282a.(c)(3), the Director, by order, shall assess the civil penalty set forth in the Notice of Violation.

(h) The Director may amend the final notice of violation at any time before the time periods specified in paragraphs (d)(1) or (d)(2) expire. An amendment shall add fifteen days to the time period under paragraph (d) of this section.

(i) The Director may withdraw the final notice of violation, or any part thereof, at any time before the time periods specified in paragraphs (d)(1) or (d)(2) expire.

§ 824.8 Hearing.

(a) Any person who receives a final notice of violation under § 824.7 may request a hearing concerning the allegations contained in the notice. The person must mail or deliver any written request for a hearing to the Director within 30 calendar days of receipt of the final notice of violation.

(b) Upon receipt from a person of a written request for a hearing, the Director shall:

(1) Appoint a Hearing Counsel; and

(2) Select an administrative law judge appointed under section 3105 of Title 5, U.S.C., to serve as Hearing Officer.

§ 824.9 Hearing Counsel.

The Hearing Counsel:

(a) Represents DOE;

(b) Consults with the person or the person's counsel prior to the hearing;

(c) Examines and cross-examines witnesses during the hearing; and

(d) Enters into a settlement of the enforcement proceeding at any time if settlement is consistent with the objectives of the Act and DOE security requirements.

§ 824.10 Hearing Officer.

The Hearing Officer:

(a) Is responsible for the administrative preparations for the hearing;

(b) Convenes the hearing as soon as is reasonable;

(c) Administers oaths and affirmations;

(d) Issues subpoenas, at the request of either party or on the Hearing Officer's motion;

(e) Rules on offers of proof and receives relevant evidence;

(f) Takes depositions or has depositions taken when the ends of justice would be served;

(g) Conducts the hearing in a manner which is fair and impartial;

(h) Holds conferences for the settlement or simplification of the issues by consent of the parties;

(i) Disposes of procedural requests or similar matters;

(j) Requires production of documents; and

(k) Makes an initial decision under § 824.13.

§ 824.11 Rights of the person at the hearing.

The person may:

(a) Testify or present evidence through witnesses or by documents;

(b) Cross-examine witnesses and rebut records or other physical evidence, except as provided in § 824.12(d);

(c) Be present during the entire hearing, except as provided in § 824.12(d); and

(d) Be accompanied, represented and advised by counsel of the person's choosing.

§ 824.12 Conduct of the hearing.

(a) DOE shall make a transcript of the hearing;

(b) Except as provided in paragraph (d) of this section, the Hearing Officer may receive any oral or documentary evidence, but shall exclude irrelevant, immaterial or unduly repetitious evidence;

(c) Witnesses shall testify under oath and are subject to cross-examination, except as provided in paragraph (d) of this section;

(d) The Hearing Officer must use procedures appropriate to safeguard and prevent unauthorized disclosure of classified information or any other information protected from public disclosure by law or regulation, with minimum impairment of rights and obligations under this part. The classified or otherwise protected status of any information shall not, however, preclude its being introduced into evidence. The Hearing Officer may issue such orders as may be necessary to consider such evidence in camera including the preparation of a supplemental initial decision to address issues of law or fact that arise out of that portion of the evidence that is classified or otherwise protected.

(e) DOE has the burden of going forward with and of proving by a preponderance of the evidence that the violation occurred as set forth in the final notice of violation and that the proposed civil penalty is appropriate. The person to whom the final notice of violation has been addressed shall have the burden of presenting and of going forward with any defense to the allegations set forth in the final notice of violation. Each matter of controversy shall be determined by the Hearing Officer upon a preponderance of the evidence.

§ 824.13 Initial decision.

(a) The Hearing Officer shall issue an initial decision as soon as practicable after the hearing. The initial decision shall contain findings of fact and conclusions regarding all material issues of law, as well as reasons therefor. If the Hearing Officer determines that a violation has occurred and that a civil penalty is appropriate, the initial decision shall set forth the amount of the civil penalty based on:

(1) The nature, circumstances, extent, and gravity of the violation or violations;

(2) The violator's ability to pay;

(3) The effect of the civil penalty on the person's ability to do business;

(4) Any history of prior violations;

(5) The degree of culpability; and

(6) Such other matters as justice may require.

(b) The Hearing Officer shall serve all parties with the initial decision by certified mail, return receipt requested. The initial decision shall include notice that it constitutes a final order of DOE 30 days after the filing of the initial decision unless the Secretary files a Notice of Review. If the Secretary files a notice of Notice of Review, he shall file a final order as soon as practicable after completing his review. The Secretary, at his discretion, may order additional proceedings, remand the matter, or modify the amount of the civil penalty assessed in the initial decision. DOE shall notify the person of the Secretary's action under this paragraph in writing by certified mail, return receipt requested. The person against whom the civil penalty is assessed by the final order shall pay the full amount of the civil penalty assessed in the final order within thirty days (30) unless otherwise agreed by the Director.

§ 824.14 Special procedures.

A person receiving a final notice of violation under § 824.7 may elect in writing, within 30 days of receipt of such notice, the application of special procedures regarding payment of the penalty set forth in section 234A.c.(3) of the Act, 42 U.S.C. 2282a(c)(3). The Director shall promptly assess a civil penalty, by order, after the date of such election. If the civil penalty has not been paid within sixty calendar days after the assessment has been issued, the DOE shall institute an action in the appropriate District Court of the United States for an order affirming the assessment of the civil penalty.

§ 824.15 Collection of civil penalties.

If any person fails to pay an assessment of a civil penalty after it has become a final order or after the appropriate District Court has entered final judgment for DOE under § 824.14, DOE shall institute an action to recover the amount of such penalty in an appropriate District Court of the United States.

§ 824.16 Direction to NNSA contractors.

(a) Notwithstanding any other provision of this part, the NNSA Administrator, rather than the Director, signs, issues, serves, or takes the following actions that direct NNSA contractors or subcontractors.

(1) Subpoenas;

(2) Orders to compel attendance;

(3) Disclosures of information or documents obtained during an investigation or inspection;

(4) Preliminary notices of violation; and

(5) Final notices of violations.

(b) The Administrator shall act after consideration of the Director's recommendation. If the Administrator disagrees with the Director's recommendation, and the disagreement cannot be resolved by the two officials, the Director may refer the matter to the Deputy Secretary for resolution.

Appendix A to Part 824 General Statement of Enforcement Policy

I. Introduction

a. This policy statement sets forth the general framework through which DOE will seek to ensure compliance with its classified information security regulations and rules and classified information security-related compliance orders (hereafter collectively referred to as classified information security requirements).

The policy set forth herein is applicable to violations of classified information security requirements by DOE contractors and their subcontractors (hereafter collectively referred to as DOE contractors). This policy statement is not a regulation and is intended only to provide general guidance to those persons subject to the classified information security requirements. It is not intended to establish a formulaic approach to the initiation and resolution of situations involving noncompliance with these requirements. Rather, DOE intends to consider the particular facts of each noncompliance situation in determining whether enforcement penalties are appropriate and, if so, the appropriate magnitude of those penalties. DOE reserves the option to deviate from this policy statement when appropriate in the circumstances of particular cases.

b. Both the Department of Energy Organization Act, 42 U.S.C. 7101, and the Atomic Energy Act of 1954 (the Act), 42 U.S.C. 2011, require DOE to protect and provide for the common defense and security of the United States in conducting its nuclear activities, and grant DOE broad authority to achieve this goal.

c. The DOE goal in the compliance arena is to enhance and protect the common defense and security at DOE facilities by fostering a culture among both DOE line organizations and contractors that actively seeks to attain and sustain compliance with classified information security requirements. The enforcement program and policy have been developed with the express purpose of achieving a culture of active commitment to security and voluntary compliance. DOE will establish effective administrative processes and incentives for contractors to identify and report noncompliances promptly and openly and to initiate comprehensive corrective actions to resolve both the noncompliances themselves and the program or process deficiencies that led to noncompliance.

d. In the development of the DOE enforcement policy, DOE believes that the reasonable exercise of its enforcement authority can help to reduce the likelihood of serious security incidents. This can be accomplished by providing greater emphasis on a culture of security awareness in existing DOE operations and strong incentives for contractors to identify and correct noncompliance conditions and processes in order to protect classified information of vital significance to this nation. DOE wants to facilitate, encourage, and support contractor initiatives for the prompt identification and correction of problems. These initiatives and activities will be duly considered in exercising enforcement discretion.

e. Section 234B of the Act provides DOE with the authority to impose civil penalties and also with the authority to compromise, modify, or remit civil penalties with or without conditions. In implementing section 234B, DOE will carefully consider the facts of each case of noncompliance and will exercise appropriate judgment in taking any enforcement action. Part of the function of a sound enforcement program is to assure a proper and continuing level of security vigilance. The reasonable exercise of enforcement authority will be facilitated by the appropriate application of security requirements to nuclear facilities and by promoting and coordinating the proper contractor attitude toward complying with those requirements.

II. Purpose

The purpose of the DOE enforcement program is to promote and protect the common defense and security of the United States by:

a. Ensuring compliance by DOE contractors with applicable classified information security requirements.

b. Providing positive incentives for a DOE contractor's:

(1) Timely self-identification of security deficiencies,

(2) Prompt and complete reporting of such deficiencies to DOE,

(3) Root cause analyses of security deficiencies,

(4) Prompt correction of security deficiencies in a manner which precludes recurrence, and

(5) Identification of modifications in practices or facilities that can improve security.

c. Deterring future violations of DOE requirements by a DOE contractor.

d. Encouraging the continuous overall improvement of operations at DOE facilities.

III. Statutory Authority

Section 234B of the Act subjects contractors, and their subcontractors and suppliers, to civil penalties for violations of DOE regulations, rules and orders regarding the safeguarding and security of Restricted Data and other classified information.

IV. Procedural Framework

a. 10 CFR part 824 sets forth the procedures DOE will use in exercising its enforcement authority, including the issuance of notices of violation and the resolution of contested enforcement actions in the event a DOE contractor elects to adjudicate contested issues before an administrative law judge.

b. Pursuant to § 824.6, the Director initiates the civil penalty process by issuing a preliminary notice of violation that specifies a proposed civil penalty. The DOE contractor is required to respond in writing to the preliminary notice of violation, either admitting the violation and waiving its right to contest the proposed civil penalty and paying it; admitting the violation, but asserting the existence of mitigating circumstances that warrant either the total or partial remission of the civil penalty; or denying that the violation has occurred and providing the basis for its belief that the preliminary notice of violation is incorrect. After evaluation of the DOE's contractor response, the Director may determine that no violation has occurred; that the violation occurred as alleged in the preliminary notice of violation, but that the proposed civil penalty should be remitted in whole or in part; or that the violation occurred as alleged in the preliminary notice of violation and that the proposed civil penalty is appropriate notwithstanding the asserted mitigating circumstances. In the latter two instances, the Director will issue a final notice of violation or a final notice of violation with proposed civil penalty.

c. An opportunity to challenge a proposed civil penalty either before an administrative law judge or in a United States District Court is provided in 42 U.S.C. 2282a(c). Part 824 sets forth the procedures associated with an administrative hearing, should the contractor opt for that method of challenging the proposed civil penalty.

V. Severity of Violations

a. Violations of classified information security requirements have varying degrees of security significance. Therefore, the relative importance of each violation must be identified as the first step in the enforcement process. Violations of classified information security requirements are categorized in three levels of severity to identify their relative security significance. Notices of violation are issued for noncompliance and propose civil penalties commensurate with the severity level of the violation(s) involved.

b. Severity Level I has been assigned to violations that are the most significant and Severity Level III violations are the least significant. Severity Level I is reserved for violations of classified information security requirements which involve actual or high potential for adverse impact on the national security. Severity Level II violations represent a significant lack of attention or carelessness toward responsibilities of DOE contractors for the protection of classified information which could, if uncorrected, potentially lead to an adverse impact on the national security. Severity Level III violations are less serious, but are of more than minor concern: i.e., if left uncorrected, they could lead to a more serious concern. In some cases, violations may be evaluated in the aggregate and a single severity level assigned for a group of violations.

c. Isolated minor violations of classified information security requirements will not be the subject of formal enforcement action through the issuance of a notice of violation. However, these minor violations will be identified as noncompliances and tracked to assure that appropriate corrective/remedial action is taken to prevent their recurrence, and evaluated to determine if generic or specific problems exist. If circumstances demonstrate that a number of related minor noncompliances have occurred in the same time frame (e.g., all identified during the same assessment), or that related minor noncompliances have recurred despite prior notice to the DOE contractor and sufficient opportunity to correct the problem, DOE may choose in its discretion to consider the noncompliances in the aggregate as a more serious violation warranting a Severity Level III designation, a notice of violation and a possible civil penalty.

d. The severity level of a violation will depend, in part, on the degree of culpability of the DOE contractor with regard to the violation. Thus, inadvertent or negligent violations will be viewed differently from those in which there is gross negligence, deception or willfulness. In addition to the significance of the underlying violation and level of culpability involved, DOE will also consider the position, training and experience of the person involved in the violation. Thus, for example, a violation may be deemed to be more significant if a senior manager of an organization is involved rather than a foreman or non-supervisory employee. In this regard, while management involvement, direct or indirect, in a violation may lead to an increase in the severity level of a violation and proposed civil penalty, the lack of such involvement will not constitute grounds to reduce the severity level of a violation or mitigate a civil penalty. Allowance of mitigation in such circumstances could encourage lack of management involvement in DOE contractor activities and a decrease in protection of classified information.

e. Other factors which will be considered by DOE in determining the appropriate severity level of a violation are the duration of the violation, the past performance of the DOE contractor in the particular activity area involved, whether the DOE contractor had prior notice of a potential problem, and whether there are multiple examples of the violation in the same time frame rather than an isolated occurrence. The relative weight given to each of these factors in arriving at the appropriate severity level will depend on the circumstances of each case.

f. DOE expects contractors to provide full, complete, timely, and accurate information and reports. Accordingly, the severity level of a violation involving either failure to make a required report or notification to DOE or an untimely report or notification will be based upon the significance of, and the circumstances surrounding, the matter that should have been reported. A contractor will not normally be cited for a failure to report a condition or event unless the contractor was actually aware or should have been aware of the condition or event which it failed to report.

VI. Enforcement Conferences

a. Should DOE determine, after completion of all assessment and investigation activities associated with a potential or alleged violation of classified information security requirements, that there is a reasonable basis to believe that a violation has actually occurred, and the violation may warrant a civil penalty, DOE will normally hold an enforcement conference with the DOE contractor involved prior to taking enforcement action. DOE may also elect to hold an enforcement conference for potential violations which would not ordinarily warrant a civil penalty but which could, if repeated, lead to such action. The purpose of the enforcement conference is to assure the accuracy of the facts upon which the preliminary determination to consider enforcement action is based, discuss the potential or alleged violations, their significance and causes, and the nature of and schedule for the DOE contractor's corrective actions, determine whether there are any aggravating or mitigating circumstances, and obtain other information which will help determine the appropriate enforcement action.

b. DOE contractors will be informed prior to a meeting when that meeting is considered to be an enforcement conference. Such conferences are informal mechanisms for candid pre-decisional discussions regarding potential or alleged violations and will not normally be open to the public. In circumstances for which immediate enforcement action is necessary in the interest of the national security, such action will be taken prior to the enforcement conference, which may still be held after the necessary DOE action has been taken.

VII. Enforcement Letter

a. In cases where DOE has decided not to issue a notice of violation, DOE may send an enforcement letter to the contractor signed by the Director. The enforcement letter is intended to communicate the basis of the decision not to pursue further enforcement action for a noncompliance. The enforcement letter is intended to point contractors to the desired level of security performance. It may be used when the Director concludes the specific noncompliance at issue is not of the level of significance warranted for issuance of a notice of violation. The enforcement letter will typically describe how the contractor handled the circumstances surrounding the noncompliance and address additional areas requiring the contractor's attention and DOE's expectations for corrective action. The enforcement letter notifies the contractor that, when verification is received that corrective actions have been implemented, DOE will close the enforcement action. In the case of NNSA contractors or subcontractors, the enforcement letter will take the form of advising the contractor or subcontractor that the Director has consulted with the NNSA Administrator who agrees that further enforcement action should not be pursued if verification is received that corrective actions have been implemented by the contractor or subcontractor.

b. In many investigations, an enforcement letter may not be required. When DOE decides that a contractor has appropriately corrected a noncompliance or that the significance of the noncompliance is sufficiently low, it may close out an investigation without such enforcement letter. A closeout of a noncompliance with or without an enforcement letter may only take place after the Director has issued a letter confirming that corrective actions have been completed. In the case of NNSA contractors or subcontractors, the Director's letter will take the form of confirming that corrective actions have been completed and advising that the Director has consulted with the NNSA Administrator who agrees that no enforcement action should be pursued.

VIII. Enforcement Actions

The nature and extent of the enforcement action is intended to reflect the seriousness of the violation involved. For the vast majority of violations for which DOE assigns severity levels as described previously, a notice of violation will be issued, requiring a formal response from the recipient describing the nature of and schedule for corrective actions it intends to take regarding the violation.

1. Notice of Violation

a. A Notice of Violation (preliminary or final) is a document setting forth the conclusion that one or more violations of classified information security requirements have occurred. Such a notice normally requires the recipient to provide a written response which may take one of several positions described in Section IV of this policy statement. In the event that the recipient concedes the occurrence of the violation, it is required to describe corrective steps which have been taken and the results achieved; remedial actions which will be taken to prevent recurrence; and the date by which full compliance will be achieved.

b. DOE will use the notice of violation as the standard method for formalizing the existence of a possible violation and the notice of violation will be issued in conjunction with the proposed imposition of a civil penalty. In certain limited instances, as described in this section, DOE may refrain from the issuance of an otherwise appropriate notice of violation. However, a notice of violation normally will be issued for willful violations, for violations where past corrective actions for similar violations have not been sufficient to prevent recurrence and there are no other mitigating circumstances.

c. DOE contractors are not ordinarily cited for violations resulting from matters not within their control, such as equipment failures that were not avoidable by reasonable quality assurance measures, proper maintenance, or management controls. With regard to the issue of funding, however, DOE does not consider an asserted lack of funding to be a justification for noncompliance with classified information security requirements. Should a contractor believe that a shortage of funding precludes it from achieving compliance with one or more of these requirements, it may request, in writing, an exemption from the requirement(s) in question from the appropriate Secretarial Officer (SO). If no exemption is granted, the contractor, in conjunction with the SO, must take appropriate steps to modify, curtail, suspend or cease the activities which cannot be conducted in compliance with the classified information security requirement(s) in question.

d. DOE expects the contractors which operate its facilities to have the proper management and supervisory systems in place to assure that all activities at DOE facilities, regardless of who performs them, are carried out in compliance with all classified information security requirements. Therefore, contractors normally will be held responsible for the acts or omissions of their employees and subcontractor employees in the conduct of activities at DOE facilities.

2. Civil Penalty

a. A civil penalty is a monetary penalty that may be imposed for violations of applicable classified information security requirements, including compliance orders. Civil penalties are designed to emphasize the need for lasting remedial action, deter future violations, and underscore the importance of DOE contractor self-identification, reporting and correction of violations.

b. Absent mitigating circumstances as described below, or circumstances otherwise warranting the exercise of enforcement discretion by DOE as described in this section, civil penalties will be proposed for Severity Level I and II violations. Civil penalties also will be proposed for Severity Level III violations which are similar to previous violations for which the contractor did not take effective corrective action. “Similar” violations are those which could reasonably have been expected to have been prevented by corrective action for the previous violation. DOE normally considers civil penalties only for similar Severity Level III violations that occur over an extended period of time.

c. DOE will impose different base level civil penalties considering the severity level of the violation(s). Table 1 shows the daily base civil penalties for the various categories of severity levels. However, as described in Section V, the imposition of civil penalties will also take into account the gravity, circumstances, and extent of the violation or violations and, with respect to the violator, any history of prior similar violations and the degree of culpability and knowledge.

d. Regarding the factor of ability of DOE contractors to pay the civil penalties, it is not DOE's intention that the economic impact of a civil penalty is such that it puts a DOE contractor out of business. Contract termination, rather than civil penalties, is used when the intent is to terminate a contractor's management of a DOE facility. The deterrent effect of civil penalties is best served when the amount of such penalties takes this factor into account. However, DOE will evaluate the relationship of entities affiliated with the contractor (such as parent corporations) when it asserts that it cannot pay the proposed penalty.

e. DOE will review each case involving a proposed civil penalty on its own merit and adjust the base civil penalty values upward or downward appropriately. As indicated in paragraph 2.c of this section, Table 1 identifies the daily base civil penalty values for different severity levels. After considering all relevant circumstances, civil penalties may be escalated or mitigated based upon the adjustment factors described below in this section. In no instance will a civil penalty for any one violation exceed the statutory limit, as periodically adjusted for inflation as required by law, per violation. However, it should be noted that if a violation is a continuing one, under the statute, each day the violation continued constitutes a separate violation for purposes of computing the civil penalty. Thus, the per violation cap will not shield a DOE contractor that is or should have been aware of an ongoing violation and has not reported it to DOE and taken corrective action despite an opportunity to do so from liability significantly exceeding the limit. Further, as described in this section, the duration of a violation will be taken into account in determining the appropriate severity level of the base civil penalty.

Table 1—Severity level Base Civil Penalties

Severity level | Base civil penalty amount (percentage of maximum civil penalty per violation per day)

I | 100

II | 50

III | 10

3. Adjustment Factors

a. DOE's enforcement program is not an end in itself, but a means to achieve compliance with classified information security requirements, and civil penalties are not assessed for revenue purposes, but rather to emphasize the importance of compliance and to deter future violations. The single most important goal of the DOE enforcement program is to encourage early identification and reporting of security deficiencies and violations of classified information security requirements by the DOE contractors themselves rather than by DOE, and the prompt correction of any deficiencies and violations so identified. With respect to their own practices and those of their subcontractors, DOE believes that DOE contractors are in the best position to identify and promptly correct noncompliance with classified information security requirements. DOE expects that these contractors should have in place internal compliance programs which will ensure the detection, reporting and prompt correction of security-related problems that may constitute, or lead to, violations of classified information security requirements before, rather than after, DOE has identified such violations. Thus, DOE contractors are expected to be aware of and to address security problems before they are discovered by DOE. Obviously, protection of classified information is enhanced if deficiencies are discovered (and promptly corrected) by the DOE contractor, rather than by DOE, which may not otherwise become aware of a deficiency until later on, during the course of an inspection, performance assessment, or following an incident at the facility. Early identification of classified information security-related problems by DOE contractors can also have the added benefit of allowing information which could prevent such problems at other facilities in the DOE complex to be shared with other appropriate DOE contractors.

b. Pursuant to this enforcement philosophy, DOE will provide substantial incentive for the early self-identification, reporting and prompt correction of problems which constitute, or could lead to, violations of classified information security requirements. Thus, application of the adjustment factors set forth below may result in no civil penalty being assessed for violations that are identified, reported, and promptly and effectively corrected by the DOE contractor.

c. On the other hand, ineffective programs for problem identification and correction are unacceptable. Thus, for example, where a contractor fails to disclose and promptly correct violations of which it was aware or should have been aware, substantial civil penalties are warranted and may be sought, including the assessment of civil penalties for continuing violations on a per day basis.

d. Further, in cases involving factors of willfulness, repeated violations, patterns of systematic violations, flagrant DOE-identified violations or serious breakdown in management controls, DOE intends to apply its full statutory enforcement authority where such action is warranted. Based on the degree of such factors, DOE may escalate the amount of civil penalties up to the statutory maximum, as periodically adjusted for inflation as required by law, per violation per day for continuing violations.

4. Identification and Reporting

Reduction of up to 50% of the base civil penalty shown in Table 1 may be given when a DOE contractor identifies the violation and promptly reports the violation to the DOE. In weighing this factor, consideration will be given to, among other things, the opportunity available to discover the violation, the ease of discovery and the promptness and completeness of any required report. No consideration will be given to a reduction in penalty if the DOE contractor does not take prompt action to report the problem to DOE upon discovery, or if the immediate actions necessary to restore compliance with classified information security requirements or place the facility or operation in a safe configuration are not taken.

5. Self-Identification and Tracking Systems

a. DOE strongly encourages contractors to self-identify noncompliances with classified information security requirements before the noncompliances lead to a string of similar and potentially more significant events or consequences. When a contractor identifies a noncompliance through its own self-monitoring activity, DOE will normally allow a reduction in the amount of civil penalties, regardless of whether prior opportunities existed for contractors to identify the noncompliance. DOE normally will not allow a reduction in civil penalties for self-identification if DOE intervention was required to induce the contractor to report a noncompliance.

b. Self-identification of a noncompliance is possibly the single most important factor in considering a reduction in the civil penalty amount. Consideration of self-identification is linked to, among other things, whether prior opportunities existed to discover the violation, and if so, the age and number of such opportunities; the extent to which proper contractor controls should have identified or prevented the violation; whether discovery of the violation resulted from a contractor's self-monitoring activity; the extent of DOE involvement in discovering the violation or in prompting the contractor to identify the violation; and the promptness and completeness of any required report. Self-identification is also considered by DOE in deciding whether to pursue an investigation.

6. Self-Disclosing Events

a. DOE expects contractors to demonstrate acceptance of responsibility for security of classified information and to pro-actively identify noncompliance conditions in their programs and processes. In deciding whether to reduce any civil penalty proposed for violations revealed by the occurrence of a self-disclosing event (e.g. belated discovery of the disappearance of classified information or material subject to accountability rules), DOE will consider the ease with which a contractor could have discovered the noncompliance, i.e. failure to comply with classified information accountability rules, that contributed to the event and the prior opportunities that existed to discover the noncompliance. When the occurrence of an event discloses noncompliances that the contractor could have or should have identified before the event, DOE will not generally allow a reduction in civil penalties for self-identification. If a contractor simply reacts to events that disclose potentially significant consequences or downplays noncompliances which did not result in significant consequences, such contractor actions do not lead to the improvement in protection of classified information contemplated by the Act.

b. The key test is whether the contractor reasonably could have detected any of the underlying noncompliances that contributed to the event. Failure to utilize events and activities to address noncompliances may result in higher civil penalty assessments or a DOE decision not to reduce civil penalty amounts.

7. Corrective Action To Prevent Recurrence

The promptness (or lack thereof) and extent to which the DOE contractor takes corrective action, including actions to identify root causes and prevent recurrence, may result in up to a 50% increase or decrease in the base civil penalty shown in Table 1. For example, very extensive corrective action may result in reducing the proposed civil penalty as much as 50% of the base value shown in Table 1. On the other hand, the civil penalty may be increased as much as 50% of the base value if initiation or corrective action is not prompt or if the corrective action is only minimally acceptable. In weighing this factor, consideration will be given to, among other things, the appropriateness, timeliness and degree of initiative associated with the corrective action. The comprehensiveness of the corrective action will also be considered, taking into account factors such as whether the action is focused narrowly to the specific violation or broadly to the general area of concern.

8. DOE's Contribution to a Violation

There may be circumstances in which a violation of a classified information security requirement results, in part or entirely, from a direction given by DOE personnel to a DOE contractor to either take, or forbear from taking an action at a DOE facility. In such cases, DOE may refrain from issuing a notice of violation, and may mitigate, either partially or entirely, any proposed civil penalty, provided that the direction upon which the DOE contractor relied is documented in writing, contemporaneously with the direction. It should be emphasized, however, that no interpretation of a classified information security requirement is binding upon DOE unless issued in writing by the General Counsel. Further, as discussed in this section of this policy statement, lack of funding by itself will not be considered as a mitigating factor in enforcement actions.

9. Exercise of Discretion

Because DOE wants to encourage and support DOE contractor initiative for prompt self-identification, reporting and correction of problems, DOE may exercise discretion as follows:

a. In accordance with the previous discussion, DOE may refrain from issuing a civil penalty for a violation which meets all of the following criteria:

(1) The violation is promptly identified and reported to DOE before DOE learns of it;

(2) The violation is not willful or a violation that could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation;

(3) The DOE contractor, upon discovery of the violation, has taken or begun to take prompt and appropriate action to correct the violation; and

(4) The DOE contractor has taken, or has agreed to take, remedial action satisfactory to DOE to preclude recurrence of the violation and the underlying conditions which caused it.

b. DOE may refrain from proposing a civil penalty for a violation involving a past problem that meets all of the following criteria:

(1) It was identified by a DOE contractor as a result of a formal effort such as an annual self assessment that has a defined scope and timetable which is being aggressively implemented and reported;

(2) Comprehensive corrective action has been taken or is well underway within a reasonable time following identification; and

(3) It was not likely to be identified by routine contractor efforts such as normal surveillance or quality assurance activities.

c. DOE will not issue a notice of violation for cases in which the violation discovered by the DOE contractor cannot reasonably be linked to the conduct of that contractor, provided that prompt and appropriate action is taken by the DOE contractor upon identification of the past violation to report to DOE and remedy the problem.

d. DOE may refrain from issuing a notice of violation for an act or omission constituting noncompliance that meets all of the following criteria:

(1) It was promptly identified by the contractor;

(2) It is normally classified at a Severity Level III;

(3) It was promptly reported to DOE;

(4) Prompt and appropriate corrective action will be taken, including measures to prevent recurrence; and

(5) It was not a willful violation or a violation that could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation.

e. DOE may refrain from issuing a notice of violation for an act or omission constituting noncompliance that meets all of the following criteria:

(1) It was an isolated Severity Level III violation identified during an inspection or evaluation conducted by the Office of Independent Oversight, or a DOE security survey, or during some other DOE assessment activity;

(2) The identified noncompliance was properly reported by the contractor upon discovery;

(3) The contractor initiated or completed appropriate assessment and corrective actions within a reasonable period, usually before the termination of the onsite inspection or integrated performance assessment; and

(4) The violation was not willful or one which could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation.

f. In situations where corrective actions have been completed before termination of an inspection or assessment, a formal response from the contractor is not required and the inspection or integrated performance assessment report serves to document the violation and the corrective action. However, in all instances, the contractor is required to report the noncompliance through established reporting mechanisms so the noncompliance issue and any corrective actions can be properly tracked and monitored.

g. If DOE initiates an enforcement action for a violation at a Severity Level II or III and, as part of the corrective action for that violation, the DOE contractor identifies other examples of the violation with the same root cause, DOE may refrain from initiating an additional enforcement action. In determining whether to exercise this discretion, DOE will consider whether the DOE contractor acted reasonably and in a timely manner appropriate to the security significance of the initial violation, the comprehensiveness of the corrective action, whether the matter was reported, and whether the additional violation(s) substantially change the security significance or character of the concern arising out of the initial violation.

h. The preceding paragraphs are solely intended to be examples indicating when enforcement discretion may be exercised to forego the issuance of a civil penalty or, in some cases, the initiation of any enforcement action at all. However, notwithstanding these examples, a civil penalty may be proposed or notice of violation issued when, in DOE's judgment, such action is warranted on the basis of the circumstances of an individual case.

[70 FR 3607, Jan. 26, 2005, as amended at 71 FR 68733, Nov. 28, 2006; 74 FR 66033, Dec. 14, 2009; 79 FR 19, Jan. 2, 2014; 81 FR 41795, June 28, 2016]