Title 10—Energy--Volume 5

PART 830 NUCLEAR SAFETY MANAGEMENT

Authority: 42 U.S.C. 2201; 42 U.S.C. 7101 et seq.; and 50 U.S.C. 2401 et seq.

Source: 85 FR 66205, Oct. 19, 2020, unless otherwise noted.

§ 830.1 Scope.

This part governs the conduct of DOE contractors, DOE personnel, and other persons conducting activities (including providing items and services) that affect, or may affect, the safety of DOE nuclear facilities.

§ 830.2 Exclusions.

This part does not apply to:

(a) Activities that are regulated through a license by the Nuclear Regulatory Commission (NRC) or a State under an Agreement with the NRC, including activities certified by the NRC under section 1701 of the Atomic Energy Act (Act);

(b) Activities conducted under the authority of the Director, Naval Nuclear Propulsion, pursuant to Executive Order 12344, as set forth in Public Law 106- 65;

(c) Transportation activities which are regulated by the Department of Transportation;

(d) Activities conducted under the Nuclear Waste Policy Act of 1982, as amended, and any facility identified under section 202(5) of the Energy Reorganization Act of 1974, as amended; and

(e) Activities related to the launch approval and actual launch of nuclear energy systems into space.

§ 830.3 Definitions.

(a) The following definitions apply to this part:

Administrative controls means the provisions relating to organization and management, procedures, recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility.

Bases appendix means an appendix that describes the basis of the limits and other requirements in technical safety requirements.

Critical assembly means special nuclear devices designed and used to sustain nuclear reactions, which may be subject to frequent core and lattice configuration change and which frequently may be used as mockups of reactor configurations.

Criticality means the condition in which a nuclear fission chain reaction becomes self-sustaining.

Design features means the design features of a nuclear facility specified in the technical safety requirements that, if altered or modified, would have a significant effect on safe operation.

Document means recorded information that describes, specifies, reports, certifies, requires, or provides data or results.

Documented safety analysis means a documented analysis of the extent to which a nuclear facility can be operated safely with respect to workers, the public, and the environment, including a description of the conditions, safe boundaries, and hazard controls that provide the basis for ensuring safety.

Environmental restoration activities means the process(es) by which contaminated sites and facilities are identified and characterized and by which contamination is contained, treated, or removed and disposed.

Fissionable materials means a nuclide capable of sustaining a neutron-induced chain reaction (e.g., uranium-233, uranium-235, plutonium-238, plutonium-239, plutonium-241, neptunium-237, americium-241, and curium-244).

Graded approach means the process of ensuring that the level of analysis, documentation, and actions used to comply with a requirement in this part are commensurate with:

(1) The relative importance to safety, safeguards, and security;

(2) The magnitude of any hazard involved;

(3) The life cycle stage of a facility;

(4) The programmatic mission of a facility;

(5) The particular characteristics of a facility;

(6) The relative importance of radiological and nonradiological hazards; and

(7) Any other relevant factor.

Hazard means a source of danger (i.e., material, energy source, or operation) with the potential to cause illness, injury, or death to a person or damage to a facility or to the environment (without regard to the likelihood or credibility of accident scenarios or consequence mitigation).

Hazard Category 1, 2, and 3 DOE nuclear facilities means nuclear facilities that meet the criteria for their respective hazard category consistent with the provisions of DOE-STD-1027-92, Change Notice 1. Hazard Category 1, 2, and 3 DOE nuclear facilities are required to have safety bases established in accordance with Subpart B of this part. Hazard categories are based on their radioactive material inventories and the potential consequences to the public, workers, and the environment. Hazard Category 1 represents the highest potential consequence and Hazard Category 3 represents the lowest potential consequence of the facilities required to establish safety bases.

Hazard controls means measures to eliminate, limit, or mitigate hazards to workers, the public, or the environment, including:

(1) Physical, design, structural, and engineering features;

(2) Safety structures, systems, and components;

(3) Safety management programs;

(4) Technical safety requirements; and

(5) Other controls necessary to provide adequate protection from hazards.

Item is an all-inclusive term used in place of any of the following: Appurtenance, assembly, component, equipment, material, module, part, product, structure, subassembly, subsystem, system, unit, or support systems.

Limiting conditions for operation means the limits that represent the lowest functional capability or performance level of safety structures, systems, and components required for safe operations.

Limiting control settings means the settings on safety systems that control process variables to prevent exceeding a safety limit.

Low-level residual fixed radioactivity means the remaining radioactivity following reasonable efforts to remove radioactive systems, components, and stored materials. The remaining radioactivity is composed of surface contamination that is fixed following chemical cleaning or some similar process; a component of surface contamination that can be picked up by smears; or activated materials within structures. The radioactivity can be characterized as low-level if the smearable radioactivity is less than the values defined for removable contamination by 10 CFR part 835, Appendix D, Surface Contamination Values, and the hazard analysis results show that no credible accident scenario or work practices would release the remaining fixed radioactivity or activation components at levels that would prudently require the use of active safety systems, structures, or components to prevent or mitigate a release of radioactive materials.

Major modification means a modification to a DOE nuclear facility that substantially changes the existing safety basis for the facility.

New Hazard Category 1, 2, and 3 DOE nuclear facility means a Hazard Category 1, 2, or 3 DOE nuclear facility that is in design or under construction that does not yet have a DOE approved safety basis.

Nonreactor nuclear facility means those facilities, activities or operations that involve, or will involve, radioactive and/or fissionable materials in such form and quantity that a nuclear or a nuclear explosive hazard potentially exists to workers, the public, or the environment, but does not include accelerators and their operations and does not include activities involving only incidental use and generation of radioactive materials or radiation such as check and calibration sources, use of radioactive sources in research and experimental and analytical laboratory activities, electron microscopes, and X-ray machines.

Nuclear facility means a reactor or a nonreactor nuclear facility where an activity is conducted for or on behalf of DOE and includes any related area, structure, facility, or activity to the extent necessary to ensure proper implementation of the requirements established by this Part.

Operating limits means those limits required to ensure the safe operation of a nuclear facility, including limiting control settings and limiting conditions for operation.

Preliminary documented safety analysis means documentation prepared in connection with the design and construction of a new Hazard Category 1, 2, or 3 DOE nuclear facility or a major modification to an existing Hazard Category 1, 2, or 3 DOE nuclear facility that provides a reasonable basis for the preliminary conclusion that the nuclear facility can be operated safely through the consideration of factors such as:

(1) The nuclear safety design criteria to be satisfied;

(2) A safety analysis that derives aspects of design that are necessary to satisfy the nuclear safety design criteria; and

(3) An initial listing of the safety management programs that must be developed to address operational safety considerations.

Process means a series of actions that achieves an end or result.

Quality means the condition achieved when an item, service, or process meets or exceeds the user's requirements and expectations.

Quality assurance means all those actions that provide confidence that quality is achieved.

Quality Assurance Program (QAP) means the overall program or management system established to assign responsibilities and authorities, define policies and requirements, and provide for the performance and assessment of work.

Reactor means any apparatus that is designed or used to sustain nuclear chain reactions in a controlled manner such as research, test, and power reactors, and critical and pulsed assemblies and any assembly that is designed to perform subcritical experiments that could potentially reach criticality; and, unless modified by words such as containment, vessel, or core, refers to the entire facility, including the housing, equipment and associated areas devoted to the operation and maintenance of one or more reactor cores.

Record means a completed document or other media that provides objective evidence of an item, service, or process.

Safety basis means the documented safety analysis and hazard controls that provide reasonable assurance that a DOE nuclear facility can be operated safely in a manner that adequately protects workers, the public, and the environment.

Safety class structures, systems, and components means the structures, systems, or components, including portions of process systems, whose preventive or mitigative function is necessary to limit radioactive hazardous material exposure to the public, as determined from safety analyses.

Safety evaluation report means the report prepared by DOE to document:

(1) The sufficiency of the documented safety analysis for a Hazard Category 1, 2, or 3 DOE nuclear facility;

(2) The extent to which a contractor has satisfied the requirements of Subpart B of this part; and

(3) The basis for approval by DOE of the safety basis for the facility, including any conditions for approval.

Safety limits means the limits on process variables associated with those safety class physical barriers, generally passive, that are necessary for the intended facility function and that are required to guard against the uncontrolled release of radioactive materials.

Safety management program means a program designed to ensure a facility is operated in a manner that adequately protects workers, the public, and the environment by covering a topic such as: Quality assurance; maintenance of safety systems; personnel training; conduct of operations; inadvertent criticality protection; emergency preparedness; fire protection; waste management; or radiological protection of workers, the public, and the environment.

Safety management system means an integrated safety management system established consistent with 48 CFR 970.5223-1, Integration of environment, safety, and health into work planning and execution.

Safety significant structures, systems, and components means the structures, systems, and components which are not designated as safety class structures, systems, and components, but whose preventive or mitigative function is a major contributor to defense in depth and/or worker safety as determined from safety analyses.

Safety structures, systems, and components means both safety class structures, systems, and components and safety significant structures, systems, and components.

Service means the performance of work, such as design, manufacturing, construction, fabrication, assembly, decontamination, environmental restoration, waste management, laboratory sample analyses, inspection, nondestructive examination/testing, environmental qualification, equipment qualification, repair, installation, or the like.

Surveillance requirements means requirements relating to test, calibration, or inspection to ensure that the necessary operability and quality of safety structures, systems, and components and their support systems required for safe operations are maintained, that facility operation is within safety limits, and that limiting control settings and limiting conditions for operation are met.

Technical safety requirements (TSRs) means the limits, controls, and related actions that establish the specific parameters and requisite actions for the safe operation of a nuclear facility and include, as appropriate for the work and the hazards identified in the documented safety analysis for the facility: Safety limits, operating limits, surveillance requirements, administrative and management controls, use and application provisions, and design features, as well as a bases appendix.

Unreviewed Safety Question (USQ) means a situation where:

(1) The probability of the occurrence or the consequences of an accident or the malfunction of equipment important to safety previously evaluated in the documented safety analysis could be increased;

(2) The possibility of an accident or malfunction of a different type than any evaluated previously in the documented safety analysis could be created; or

(3) The documented safety analysis may not be bounding or may be otherwise inadequate.

Unreviewed Safety Question process means the mechanism for keeping a safety basis current by reviewing potential unreviewed safety questions, reporting unreviewed safety questions to DOE, and obtaining approval from DOE prior to taking any action that involves an unreviewed safety question.

Use and application provisions means the basic instructions for applying technical safety requirements.

(b) Terms defined in the Act or in 10 CFR part 820 and not defined in this section of the rule are to be used consistent with the meanings given in the Act or in 10 CFR part 820.

§ 830.4 General requirements.

(a) No person may take or cause to be taken any action inconsistent with the requirements of this part.

(b) A contractor responsible for a nuclear facility must ensure implementation of, and compliance with, the requirements of this part.

(c) The requirements of this part must be implemented in a manner that provides reasonable assurance of adequate protection of workers, the public, and the environment from adverse consequences, taking into account the work to be performed and the associated hazards.

(d) If there is no contractor for a DOE nuclear facility, DOE must ensure implementation of, and compliance with, the requirements of this part.

§ 830.5 Enforcement.

The requirements in this part are DOE Nuclear Safety Requirements and are subject to enforcement by all appropriate means, including the imposition of civil and criminal penalties in accordance with the provisions of 10 CFR part 820.

§ 830.6 Recordkeeping.

A contractor must maintain complete and accurate records as necessary to substantiate compliance with the requirements of this part.

§ 830.7 Graded approach.

Where appropriate, a contractor must use a graded approach to implement the requirements of this part, document the basis of the graded approach used, and submit that documentation to DOE. The graded approach may not be used in implementing the unreviewed safety question (USQ) process or in implementing technical safety requirements.

Subpart A Quality Assurance Requirements

§ 830.120 Scope.

This subpart establishes quality assurance requirements for contractors conducting activities, including providing items or services that affect, or may affect, nuclear safety of DOE nuclear facilities.

§ 830.121 Quality Assurance Program (QAP).

(a) Contractors conducting activities, including providing items or services, that affect, or may affect, the nuclear safety of DOE nuclear facilities must conduct work in accordance with the Quality Assurance criteria in § 830.122.

(b) The contractor responsible for a DOE nuclear facility must:

(1) Submit a QAP to DOE for approval and regard the QAP as approved 90 days after submittal, unless it is approved or rejected by DOE at an earlier date.

(2) Modify the QAP as directed by DOE.

(3) Annually submit any changes to the DOE-approved QAP to DOE for approval. Justify in the submittal why the changes continue to satisfy the quality assurance requirements.

(4) Conduct work in accordance with the QAP.

(c) The QAP must:

(1) Describe how the quality assurance criteria of § 830.122 are satisfied.

(2) Integrate the quality assurance criteria with the Safety Management System, or describe how the quality assurance criteria apply to the Safety Management System.

(3) Use voluntary consensus standards in its development and implementation, where practicable and consistent with contractual and regulatory requirements, and identify the standards used.

(4) Describe how the contractor responsible for the nuclear facility ensures that subcontractors and suppliers satisfy the criteria of § 830.122.

§ 830.122 Quality assurance criteria.

The QAP must address the following management, performance, and assessment criteria:

(a) Criterion 1—Management/Program. (1) Establish an organizational structure, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the work.

(2) Establish management processes, including planning, scheduling, and providing resources for the work.

(b) Criterion 2—Management/Personnel Training and Qualification. (1) Train and qualify personnel to be capable of performing their assigned work.

(2) Provide continuing training to personnel to maintain their job proficiency.

(c) Criterion 3—Management/Quality Improvement. (1) Establish and implement processes to detect and prevent quality problems.

(2) Identify, control, and correct items, services, and processes that do not meet established requirements.

(3) Identify the causes of problems and work to prevent recurrence as a part of correcting the problem.

(4) Review item characteristics, process implementation, and other quality-related information to identify items, services, and processes needing improvement.

(d) Criterion 4—Management/Documents and Records. (1) Prepare, review, approve, issue, use, and revise documents to prescribe processes, specify requirements, or establish design.

(2) Specify, prepare, review, approve, and maintain records.

(e) Criterion 5—Performance/Work Processes. (1) Perform work consistent with technical standards, administrative controls, and other hazard controls adopted to meet regulatory or contract requirements, using approved instructions, procedures, or other appropriate means.

(2) Identify and control items to ensure their proper use.

(3) Maintain items to prevent their damage, loss, or deterioration.

(4) Calibrate and maintain equipment used for process monitoring or data collection.

(f) Criterion 6—Performance/Design. (1) Design items and processes using sound engineering/scientific principles and appropriate standards.

(2) Incorporate applicable requirements and design bases in design work and design changes.

(3) Identify and control design interfaces.

(4) Verify or validate the adequacy of design products using individuals or groups other than those who performed the work.

(5) Verify or validate work before approval and implementation of the design.

(g) Criterion 7—Performance/Procurement. (1) Procure items and services that meet established requirements and perform as specified.

(2) Evaluate and select prospective suppliers on the basis of specified criteria.

Establish and implement processes to ensure that approved suppliers continue to provide acceptable items and services.

(h) Criterion 8—Performance/Inspection and Acceptance Testing. (1) Inspect and test specified items, services, and processes using established acceptance and performance criteria.

(2) Calibrate and maintain equipment used for inspections and tests.

(i) Criterion 9—Assessment/Management Assessment. Ensure managers assess their management processes and identify and correct problems that hinder the organization from achieving its objectives.

(j) Criterion 10—Assessment/Independent Assessment. (1) Plan and conduct independent assessments to measure item and service quality, to measure the adequacy of work performance, and to promote improvement.

(2) Establish sufficient authority, and freedom from line management, for the group performing independent assessments.

(3) Ensure persons who perform independent assessments are technically qualified and knowledgeable in the areas to be assessed.

Subpart B Safety Basis Requirements

§ 830.200 Scope.

This Subpart establishes safety basis requirements for Hazard Category 1, 2, and 3 DOE nuclear facilities.

§ 830.201 Performance of work.

A contractor must perform work in accordance with the DOE-approved safety basis for a Hazard Category 1, 2, or 3 DOE nuclear facility and, in particular, with the hazard controls that ensure adequate protection of workers, the public, and the environment.

§ 830.202 Safety basis.

(a) The contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must establish and maintain the safety basis for the facility.

(b) In establishing the safety basis for a Hazard Category 1, 2, or 3 DOE nuclear facility, the contractor responsible for the facility must:

(1) Define the scope of the work to be performed;

(2) Identify and analyze the hazards associated with the work;

(3) Categorize the facility consistent with DOE-STD-1027-92 (“Hazard Categorization and Accident Analysis Techniques for compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports,” Change Notice 1, September 1997);

(4) Prepare a documented safety analysis for the facility; and

(5) Establish the hazard controls upon which the contractor will rely to ensure adequate protection of workers, the public, and the environment.

(c) In maintaining the safety basis for a Hazard Category 1, 2, or 3 DOE nuclear facility, the contractor responsible for the facility must:

(1) Update the safety basis to keep it current and to reflect changes in the facility, the work and the hazards as they are analyzed in the documented safety analysis;

(2) Annually provide DOE the current documented safety analysis or a letter stating that there have been no changes in the documented safety analysis since the prior submittal; and

(3) Incorporate in the safety basis any changes, conditions, or hazard controls directed by DOE.

§ 830.203 Unreviewed safety question process.

(a) The contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must establish, implement, and take actions consistent with a DOE-approved USQ procedure that meets the requirements of this section.

(b) The contractor responsible for a new Hazard Category 1, 2, or 3 DOE nuclear facility must submit for DOE approval a procedure for its USQ process on a schedule that allows DOE approval in a safety evaluation report issued pursuant to § 830. 207(a) of this part.

(c) The contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must implement the DOE-approved USQ procedure in situations where there is a:

(1) Temporary or permanent change in the facility as described in the existing documented safety analysis;

(2) Temporary or permanent change in the procedures as described in the existing documented safety analysis;

(3) Test or experiment not described in the existing documented safety analysis; or

(4) Potential inadequacy of the documented safety analysis because the analysis potentially may not be bounding or may be otherwise inadequate.

(d) A contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must obtain DOE approval prior to taking any action determined to involve a USQ.

(e) The contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must annually provide to DOE a summary of the USQ determinations performed since the prior submittal.

(f) If a contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility discovers or is made aware of a potential inadequacy of the documented safety analysis, it must:

(1) Take action, as appropriate, to place or maintain the facility in a safe condition until an evaluation of the safety of the situation is completed;

(2) Notify DOE of the situation;

(3) Perform a USQ determination and notify DOE promptly of the results; and

(4) Submit the evaluation of the safety of the situation to DOE prior to removing any operational restrictions initiated to meet paragraph (f)(1) of this section.

§ 830.204 Documented safety analysis.

(a) The contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must obtain approval from DOE for the methodology used to prepare the documented safety analysis for the facility unless the contractor uses a methodology set forth in Table 1 of Appendix A to this part.

(b) The documented safety analysis for a Hazard Category 1, 2, or 3 DOE nuclear facility must, as appropriate for the complexities and hazards associated with the facility:

(1) Describe the facility (including the design of safety structures, systems and components) and the work to be performed;

(2) Provide a systematic identification of both natural and man-made hazards associated with the facility;

(3) Evaluate normal, abnormal, and accident conditions, including consideration of natural and man-made external events, identification of energy sources or processes that might contribute to the generation or uncontrolled release of radioactive and other hazardous materials, and consideration of the need for analysis of accidents which may be beyond the design basis of the facility;

(4) Derive the hazard controls necessary to ensure adequate protection of workers, the public, and the environment, demonstrate the adequacy of these controls to eliminate, limit, or mitigate identified hazards, and define the process for maintaining the hazard controls current at all times and controlling their use;

(5) Define the characteristics of the safety management programs necessary to ensure the safe operation of the facility, including (where applicable) quality assurance, procedures, maintenance, personnel training, conduct of operations, emergency preparedness, fire protection, waste management, and radiation protection; and

(6) With respect to a nonreactor nuclear facility with fissionable material in a form and amount sufficient to pose a potential for criticality, define a criticality safety program that:

(i) Ensures that operations with fissionable material remain subcritical under all normal and credible abnormal conditions;

(ii) Identifies applicable nuclear criticality safety standards; and

(iii) Describes how the program meets applicable nuclear criticality safety standards.

§ 830.205 Technical safety requirements.

(a) A contractor responsible for a Hazard Category 1, 2, or 3 DOE nuclear facility must:

(1) Develop technical safety requirements that are derived from the documented safety analysis;

(2) Prior to use, obtain DOE approval of technical safety requirements and any change to technical safety requirements; and

(3) Notify DOE of any violation of a technical safety requirement.

(b) A contractor may take emergency actions that depart from an approved technical safety requirement when no actions consistent with the technical safety requirement are immediately apparent, and when these actions are needed to protect workers, the public or the environment from imminent and significant harm. Such actions must be approved by a certified operator for a reactor or by a person in authority as designated in the technical safety requirements for nonreactor nuclear facilities. The contractor must report the emergency actions to DOE as soon as practicable.

(c) A contractor for an environmental restoration activity may follow the provisions of 29 CFR 1910.120 or 29 CFR 1926.65 to develop the appropriate hazard controls (rather than the provisions for technical safety requirements in paragraph (a) of this section), provided the activity involves either:

(1) Work not done within a permanent structure, or

(2) The decommissioning of a facility with only low-level residual fixed radioactivity.

§ 830.206 Preliminary documented safety analysis.

Prior to construction of a new Hazard Category 1, 2, or 3 DOE nuclear facility or a major modification to an existing Hazard Category 1, 2, or 3 DOE nuclear facility, the contractor responsible for the design and construction of the new facility or major modification must:

(a) Prepare a preliminary documented safety analysis for the facility, and

(b) Obtain DOE approval of:

(1) The nuclear safety design criteria to be used in preparing the preliminary documented safety analysis unless the contractor uses the design criteria in DOE Order 420.1, Facility Safety, or successor document; and

(2) The preliminary documented safety analysis before the contractor can procure materials or components or begin construction; provided that DOE may authorize the contractor to perform limited procurement and construction activities without approval of a preliminary documented safety analysis if DOE determines that the activities are not detrimental to public health and safety and are in the best interests of DOE.

§ 830.207 DOE approval of safety basis.

(a) With respect to a new Hazard Category 1, 2, or 3 DOE nuclear facility or a major modification to an existing Hazard Category 1, 2, or 3 DOE nuclear facility, a contractor may not begin operation of the facility or modification prior to the issuance of a safety evaluation report in which DOE approves the safety basis for the facility or modification.

(b) Pending issuance of a safety evaluation report in which DOE approves an updated or amended safety basis for an existing Hazard Category 1, 2, or 3 DOE nuclear facility, the contractor responsible for the facility must continue to perform work in accordance with the DOE-approved safety basis for the facility and maintain the existing safety basis consistent with the requirements of this Subpart.

Appendix A to Subpart B to Part 830 General Statement of Safety Basis Policy

A. Introduction

This appendix describes DOE's expectations for the safety basis requirements of 10 CFR part 830, acceptable methods for implementing these requirements, and criteria DOE will use to evaluate compliance with these requirements. This appendix does not create any new requirements and should be used consistently with DOE's policy that work be conducted safely and efficiently and in a manner that ensures protection of workers, the public, and the environment.

B. Purpose

1. The safety basis requirements of Part 830 require the contractor responsible for a DOE nuclear facility to analyze the facility, the work to be performed, and the associated hazards and to identify the conditions, safe boundaries, and hazard controls necessary to protect workers, the public and the environment from adverse consequences. These analyses and hazard controls constitute the safety basis upon which the contractor and DOE rely to conclude that the facility can be operated safely. Performing work consistent with the safety basis provides reasonable assurance of adequate protection of workers, the public, and the environment.

2. The safety basis requirements are intended to further the objective of making safety an integral part of how work is performed throughout the DOE complex. Developing a thorough understanding of a nuclear facility, the work to be performed, the associated hazards and the needed hazard controls is essential to integrating safety into management and work at all levels. Performing work in accordance with the safety basis for a nuclear facility is the realization of that objective.

C. Scope

1. A contractor must establish and maintain a safety basis for a Hazard Category 1, 2, or 3 DOE nuclear facility because these facilities have the potential for significant radiological consequences. DOE-STD-1027 sets forth the methodology for categorizing a DOE nuclear facility based on the inventory of radioactive materials.

2. Unlike the quality assurance requirements of Part 830 that apply to all DOE nuclear facilities, the safety basis requirements only apply to Hazard Category 1, 2, and 3 DOE nuclear facilities and do not apply to nuclear facilities below Hazard Category 3.

D. Integrated Safety Management

1. The safety basis requirements are consistent with integrated safety management. DOE expects that, if a contractor complies with the Department of Energy Acquisition Regulation (DEAR) clause on integration of environment, safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment, Safety and Health into Work Planning and Execution) and the DEAR clause on laws, regulations, and DOE directives (48 CFR 970.5204-2, Laws, Regulations and DOE Directives), the contractor will have established the foundation to meet the safety basis requirements.

2. The processes embedded in a safety management system should lead to a contractor establishing adequate safety bases and safety management programs that will meet the safety basis requirements of this Subpart. Consequently, the DOE expects if a contractor has adequately implemented integrated safety management, few additional requirements will stem from this Subpart and, in such cases, the existing safety basis prepared in accordance with integrated safety management provisions, including existing DOE safety requirements in contracts, should meet the requirements of this Subpart.

3. DOE does not expect there to be any conflict between contractual requirements and regulatory requirements. In fact, DOE expects that contract provisions will be used to provide more detail on implementation of safety basis requirements such as preparing a documented safety analysis, developing technical safety requirements, and implementing a USQ process.

E. Enforcement of Safety Basis Requirements

1. Enforcement of the safety basis requirements will be performance oriented. That is, DOE will focus its enforcement efforts on whether a contractor operates a nuclear facility consistent with the safety basis for the facility and, in particular, whether work is performed in accordance with the safety basis.

2. As part of the approval process, DOE will review the content and quality of the safety basis documentation. DOE intends to use the approval process to assess the adequacy of a safety basis developed by a contractor to ensure that workers, the public, and the environment are provided reasonable assurance of adequate protection from identified hazards. Once approved by DOE, the safety basis documentation will not be subject to regulatory enforcement actions unless DOE determines that the information which supports the documentation is not complete and accurate in all material respects, as required by 10 CFR 820.11. This is consistent with the DOE enforcement provisions and policy in 10 CFR part 820.

3. DOE does not intend the adoption of the safety basis requirements to affect the existing quality assurance requirements or the existing obligation of contractors to comply with the quality assurance requirements. In particular, in conjunction with the adoption of the safety basis requirements, DOE revised the language in 10 CFR 830.122(e)(1) to make clear that hazard controls are part of the work processes to which a contractor and other persons must adhere when performing work. This obligation to perform work consistent with hazard controls adopted to meet regulatory or contract requirements existed prior to the adoption of the safety basis requirements and is both consistent with and independent of the safety basis requirements.

4. A documented safety analysis must address all hazards (that is, both radiological and nonradiological hazards) and the controls necessary to provide adequate protection to the public, workers, and the environment from these hazards. Section 234A of the Atomic Energy Act only authorizes DOE to issue civil penalties for violations of requirements related to nuclear safety. Therefore, DOE will impose civil penalties for violations of the safety basis requirements (including hazard controls) only if they are related to nuclear safety.

F. Documented Safety Analysis

1. A documented safety analysis must demonstrate the extent to which a nuclear facility can be operated safely with respect to workers, the public, and the environment.

2. DOE expects a contractor to use a graded approach to develop a documented safety analysis and describe how the graded approach was applied. The level of detail, analysis, and documentation will reflect the complexity and hazards associated with a particular facility. Thus, the documented safety analysis for a simple, low hazard facility may be relatively short and qualitative in nature, while the documented safety analysis for a complex, high hazard facility may be quite elaborate and more quantitative. DOE will work with its contractors to ensure a documented safety analysis is appropriate for the facility for which it is being developed.

3. Because DOE has ultimate responsibility for the safety of its facilities, DOE will review each documented safety analysis:

(i) As part of the initial submittal;

(ii) When revisions are submitted as part of a positive USQ determination or major modification;

(iii) If DOE has reason to believe a portion of the safety basis to be inadequate, or;

(iv) If DOE has reason to believe a portion of the safety basis has substantially changed. DOE will review the documented safety analysis to determine whether the rigor and detail of the documented safety analysis are appropriate for the complexity and hazards expected at the nuclear facility. In particular, DOE will evaluate the documented safety analysis by considering the extent to which the documented safety analysis:

(A) Satisfies the provisions of the methodology used to prepare the documented safety analysis and

(B) Adequately addresses the criteria set forth in 10 CFR 830.204(b). DOE will prepare a Safety Evaluation Report to document the results of its review of the documented safety analysis. A documented safety analysis must contain any conditions or changes required by DOE in the Safety Evaluation Report. Generally, DOE's review of the annual submittal may be limited to ensuring that the results of USQs have been adequately incorporated into the documented safety analysis. If additional changes are proposed by the contractor and included in the annual update that have not been previously approved by DOE or have not been evaluated as a part of the USQ process, DOE must review and approve these changes. DOE has the authority to review the safety basis at any time.

4. In most cases, the contract will provide the framework for specifying the methodology and schedule for developing a documented safety analysis. Table 1 sets forth acceptable methodologies for preparing a documented safety analysis.

Table 1

The contractor responsible for: | May prepare its document safety analysis by:

(1) A DOE reactor | Using the method in U.S. Nuclear Regulatory Commission Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, or successor document.

(2) A DOE nonreactor nuclear facility | Using the method in DOE-STD-3009, Change Notice No. 1, January 2000, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, July 1994, or successor document.

(3) A DOE nuclear facility with a limited operational life | Using the method in either: (i) DOE-STD-3009-, Change Notice No. 1, January 2000, or successor document, or (ii) DOE-STD-3011-94, Guidance for Preparation of DOE 5480.22 (TSR) and DOE 5480.23 (SAR) Implementation Plans, November 1994, or successor document.

(4) The deactivation or the transition surveillance and maintenance of a DOE nuclear facility | Using the method in either: (i) DOE-STD-3009, Change Notice No. 1, January 2000, or successor document, or (ii) DOE-STD-3011-94 or successor document.

(5) The decommissioning of a DOE nuclear facility | (i) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility Disposition Activities, May 1998, or successor document; (ii) Using the provisions in 29 CFR 1910.120 (or 29 CFR 1926.65 for construction activities) for developing Safety and Health Programs, Work Plans, Health and Safety Plans, and Emergency Response Plans to address public safety, as well as worker safety; and (iii) Deriving hazard controls based on the Safety and Health Programs, the Work Plans, the Health and Safety Plans, and the Emergency Response Plans.

(6) A DOE environmental restoration activity that involves either work not done within a permanent structure or the decommissioning of a facility with only low-level residual fixed radioactivity | (i) Using the method in DOE-STD-1120-98 or successor document, and (ii) Using the provisions in 29 CFR 1910.120 (or 29 CFR 1926.65 for construction activities) for developing a Safety and Health Program and a site-specific Health and Safety Plan (including elements for Emergency Response Plans, conduct of operations, training and qualifications, and maintenance management).

(7) A DOE nuclear explosive facility and the nuclear explosive operations conducted therein | Developing its documented safety analysis in two pieces: (i) A Safety Analysis Report for the nuclear facility that considers the generic nuclear explosive operations and is prepared in accordance with DOE-STD-3009, Change Notice No. 1, January 2000, or successor document, and (ii) A Hazard Analysis Report for the specific nuclear explosive operations prepared in accordance with DOE-STD-3016-99, Hazards Analysis Reports for Nuclear Explosive Operations, February 1999, or successor document.

(8) A DOE Hazard Category 3 nonreactor nuclear facility | Using the methods in Chapters 2, 3, 4, and 5 of DOE-STD-3009, Change Notice No. 1, January 2000, or successor document to address in a simplified fashion: (i) The basic description of the facility/activity and its operations, including safety structures, systems, and components; (ii) A qualitative hazards analysis; and (iii) The hazard controls (consisting primarily of inventory limits and safety management programs) and their bases.

(9) Transportation activities | (i) Preparing a Safety Analysis Report for Packaging in accordance with DOE-O-460.1A, Packaging and Transportation Safety, October 2, 1996, or successor document and (ii) Preparing a Transportation Safety Document in accordance with DOE-G-460.1-1, Implementation Guide for Use with DOE O 460.1A, Packaging and Transportation Safety, June 5, 1997, or successor document.

(10) Transportation and onsite transfer of nuclear explosives, nuclear components, Naval nuclear fuel elements, Category I and Category II special nuclear materials, special assemblies, and other materials of national security | (i) Preparing a Safety Analysis Report for Packaging in accordance with DOE-O-461.1, Packaging and Transportation of Materials of National Security Interest, September 29, 2000, or successor document and (ii) Preparing a Transportation Safety Document in accordance with DOE-M-461.1-1, Packaging and Transfer of Materials of National Security Interest Manual, September 29, 2000, or successor document.

5. Table 1 refers to specific types of nuclear facilities. These references are not intended to constitute an exhaustive list of the specific types of nuclear facilities. Part 830 defines nuclear facility broadly to include a reactor or a nonreactor nuclear facility where an activity is conducted for or on behalf of DOE and includes any related area, structure, facility, or activity to the extent necessary to ensure proper implementation of the requirements established by this part. The only exceptions are those facilities specifically excluded such as accelerators. Table 2 defines the terms referenced in Table 1 that are not defined in 10 CFR 830.3.

Table 2

For purposes of Table 1: | Means:

(1) Deactivation | The process of placing a facility in a stable and known condition, including the removal of hazardous and radioactive materials.

(2) Decontamination | The removal or reduction of residual radioactive and hazardous materials by mechanical, chemical, or other techniques to achieve a stated objective or end condition.

(3) Decommissioning | Those actions taking place after deactivation of a nuclear facility to retire it from service and includes surveillance and maintenance, decontamination, and/or dismantlement.

(4) Environmental restoration activities | The process by which contaminated sites and facilities are identified and characterized and by which existing contamination is contained, or removed and disposed.

(5) Generic nuclear explosive operation | A characterization that considers the collective attributes (such as special facility system requirements, physical weapon characteristics, or quantities and chemical/physical forms of hazardous materials) for all projected nuclear explosive operations to be conducted at a facility.

(6) Nuclear explosive facility | A nuclear facility at which nuclear operations and activities involving a nuclear explosive may be conducted.

(7) Nuclear explosive operation | Any activity involving a nuclear explosive, including activities in which main-charge, high-explosive parts and pits are collocated.

(8) Nuclear facility with a limited operational life | A nuclear facility for which there is a short remaining operational period before ending the facility's mission and initiating deactivation and decommissioning and for which there are no intended additional missions other than cleanup.

(9) Specific nuclear explosive operation | A specific nuclear explosive subjected to the stipulated steps of an individual operation, such as assembly or disassembly.

(10) Transition surveillance and maintenance activities | Activities conducted when a facility is not operating or during deactivation, decontamination, and decommissioning operations when surveillance and maintenance are the predominant activities being conducted at the facility. These activities are necessary for satisfactory containment of hazardous materials and protection of workers, the public, and the environment. These activities include providing periodic inspections, maintenance of structures, systems, and components, and actions to prevent the alteration of hazardous materials to an unsafe state.

6. The contractor responsible for the design and construction of a new Hazard Category 1, 2, or 3 DOE nuclear facility or a major modification to an existing Hazard Category 1, 2, or 3 DOE nuclear facility must prepare a preliminary documented safety analysis. A preliminary documented safety analysis can ensure that substantial costs and time are not wasted in constructing a nuclear facility that will not be acceptable to DOE. If a contractor is required to prepare a preliminary documented safety analysis, the contractor must obtain DOE approval of the preliminary documented safety analysis prior to procuring materials or components or beginning construction. DOE, however, may authorize the contractor to perform limited procurement and construction activities without approval of a preliminary documented safety analysis if DOE determines that the activities are not detrimental to public health and safety and are in the best interests of DOE. DOE Order 420.1, or successor document, sets forth acceptable nuclear safety design criteria for use in preparing a preliminary documented safety analysis. As a general matter, DOE does not expect preliminary documented safety analyses to be needed for activities that do not involve significant construction such as environmental restoration activities, decontamination and decommissioning activities, specific nuclear explosive operations, or transition surveillance and maintenance activities.

G. Hazard Controls

1. Hazard controls are measures to eliminate, limit, or mitigate hazards to workers, the public, or the environment. They include:

(i) Physical, design, structural, and engineering features;

(ii) Safety structures, systems, and components;

(iii) Safety management programs;

(iv) Technical safety requirements; and

(v) Other controls necessary to provide adequate protection from hazards.

2. The types and specific characteristics of the safety management programs necessary for a DOE nuclear facility will be dependent on the complexity and hazards associated with the nuclear facility and the work being performed. In most cases, however, a contractor should consider safety management programs covering topics such as quality assurance, procedures, maintenance, personnel training, conduct of operations, criticality safety, emergency preparedness, fire protection, waste management, and radiation protection. In general, DOE Orders set forth DOE's expectations concerning specific topics. For example, DOE Order 420.1, or successor document provides DOE's expectations with respect to fire protection and criticality safety.

3. Safety structures, systems, and components require formal definition of minimum acceptable performance in the documented safety analysis. This is accomplished by first defining a safety function, then describing the structure, systems, and components, placing functional requirements on those portions of the structures, systems, and components required for the safety function, and identifying performance criteria that will ensure functional requirements are met. Technical safety requirements are developed to ensure the operability of the safety structures, systems, and components and define actions to be taken if a safety structure, system, or component is not operable.

4. Technical safety requirements establish limits, controls, and related actions necessary for the safe operation of a nuclear facility. The exact form and contents of technical safety requirements will depend on the circumstances of a particular nuclear facility as defined in the documented safety analysis for the nuclear facility. As appropriate, technical safety requirements may have sections on:

(i) Safety limits;

(ii) Operating limits;

(iii) Surveillance requirements;

(iv) Administrative controls;

(v) Use and application; and

(vi) Design features.

It may also have an appendix on the bases for the limits and requirements. DOE Guide 423.1-1B, Implementation Guide for Use in Developing Technical Safety Requirements, or successor document, provides a complete description of what technical safety requirements should contain and how they should be developed and maintained.

5. DOE will examine and approve the technical safety requirements as part of preparing the safety evaluation report and reviewing updates to the safety basis. As with all hazard controls, technical safety requirements must be kept current and reflect changes in the facility, the work and the hazards as they are analyzed in the documented safety analysis. In addition, DOE expects a contractor to maintain technical safety requirements, and other hazard controls as appropriate, as controlled documents with an authorized users list.

6. Table 3 sets forth DOE's expectations concerning acceptable technical safety requirements.

Table 3

As appropriate for a particular DOE nuclear facility, the section of the technical safety requirements on: | Will provide information on:

(1) Safety limits | The limits on process variables associated with those safety class physical barriers, generally passive, that are necessary for the intended facility function and that are required to guard against the uncontrolled release of radioactive materials. The safety limit section describes, as precisely as possible, the parameters being limited, states the limit in measurable units (pressure, temperature, flow, etc.), and indicates the applicability of the limit. The safety limit section also describes the actions to be taken in the event that the safety limit is exceeded. These actions should first place the facility in the safe, stable condition attainable, including total shutdown (except where such action might reduce the margin of safety) or should verify that the facility already is safe and stable and will remain so. The technical safety requirement should state that the contractor must obtain DOE authorization to restart the nuclear facility following a violation of a safety limit. The safety limit section also establishes the steps and time limits to correct the out-of-specification condition.

(2) Operating limits | Those limits which are required to ensure the safe operation of a nuclear facility. The operating limits section may include subsections on limiting control settings and limiting conditions for operation.

(3) Limiting control settings | The settings on safety systems that control process variables to prevent exceeding a safety limit. The limited control settings section normally contains the settings for automatic alarms and for the automatic or non-automatic initiation of protective actions related to those variables associated with the function of safety class structures, systems, or components if the safety analysis shows that they are relied upon to mitigate or prevent an accident. The limited control settings section also identifies the protective actions to be taken at the specific settings chosen in order to correct a situation automatically or manually such that the related safety limit is not exceeded. Protective actions may include maintaining the variables within the requirements and repairing the automatic device promptly or shutting down the affected part of the process and, if required, the entire facility.

(4) Limiting conditions for operations | The limits that represent the lowest functional capability or performance level of safety structures, systems, and components required to perform an activity safely. The limiting conditions for operation section describes, as precisely as possible, the lowest functional capability or performance level of equipment required for continued safe operation of the facility. The limiting conditions for operation section also states the action to be taken to address a condition not meeting the limiting conditions for operation section. Normally this simply provides for the adverse condition being corrected in a certain time frame and for further action if this is impossible.

(5) Surveillance requirements | Requirements relating to test, calibration, or inspection to assure that the necessary operability and quality of safety structures, systems, and components is maintained; that facility operation is within safety limits; and that limiting control settings and limiting conditions for operation are met. If a required surveillance is not successfully completed, the contractor is expected to assume the systems or components involved are inoperable and take the actions defined by the technical safety requirement until the systems or components can be shown to be operable. If, however, a required surveillance is not performed within its required frequency, the contractor is allowed to perform the surveillance within 24 hours or the original frequency, whichever is smaller, and confirm operability.

(6) Administrative controls | Organization and management, procedures, recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility consistent with the technical safety requirement. In general, the administrative controls section addresses (i) the requirements associated with administrative controls (including those for reporting violations of the technical safety requirement); (ii) the staffing requirements for facility positions important to safe conduct of the facility; and (iii) the commitments to the safety management programs identified in the documented safety analysis as necessary components of the safety basis for the facility.

(7) Use and application provisions | The basic instructions for applying the safety restrictions contained in a technical safety requirement. The use and application section includes definitions of terms, operating modes, logical connectors, completion times, and frequency notations.

(8) Design features | Design features of the facility that, if altered or modified, would have a significant effect on safe operation.

(9) Bases appendix | The reasons for the safety limits, operating limits, and associated surveillance requirements in the technical safety requirements. The statements for each limit or requirement shows how the numeric value, the condition, or the surveillance fulfills the purpose derived from the safety documentation. The primary purpose for describing the basis of each limit or requirement is to ensure that any future changes to the limit or requirement is done with full knowledge of the original intent or purpose of the limit or requirement.

H. Unreviewed Safety Questions

1. The USQ process is an important tool to evaluate whether changes affect the safety basis. A contractor must use the USQ process to ensure that the safety basis for a DOE nuclear facility is not undermined by changes in the facility, the work performed, the associated hazards, or other factors that support the adequacy of the safety basis.

2. The USQ process permits a contractor to make physical and procedural changes to a nuclear facility and to conduct tests and experiments without prior approval, provided these changes do not cause a USQ. The USQ process provides a contractor with the flexibility needed to conduct day-to-day operations by requiring only those changes and tests with a potential to impact the safety basis (and therefore the safety of the nuclear facility) be approved by DOE. This allows DOE to focus its review on those changes significant to safety. The USQ process helps keep the safety basis current by ensuring appropriate review of and response to situations that might adversely affect the safety basis.

3. DOE Guide 424.1-1B Chg 2, Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements, or successor document provides DOE's expectations for a USQ process. The contractor must obtain DOE approval of its procedure used to implement the USQ process. The contractor is allowed to make editorial and format changes to its USQ procedure while maintaining DOE approval.

I. Functions and Responsibilities

1. The DOE Management Official for a DOE nuclear facility (that is, the Assistant Secretary, the Assistant Administrator, or the Office Director who is primarily responsible for the management of the facility) has primary responsibility within DOE for ensuring that the safety basis for the facility is adequate and complies with the safety basis requirements of Part 830. The DOE Management Official is responsible for ensuring the timely and proper—

(i) Review of all safety basis documents submitted to DOE; and

(ii) Preparation of a safety evaluation report concerning the safety basis for a facility.

2. DOE will maintain a public list on the internet that provides the status of the safety basis for each Hazard Category 1, 2, or 3 DOE nuclear facility and, to the extent practicable, provides information on how to obtain a copy of the safety basis and related documents for a facility.

PART 835 OCCUPATIONAL RADIATION PROTECTION

Authority: 42 U.S.C. 2201, 7191; 50 U.S.C. 2410.

Source: 58 FR 65485, Dec. 14, 1993, unless otherwise noted.

Subpart A General Provisions

§ 835.1 Scope.

(a) General. The rules in this part establish radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of DOE activities.

(b) Exclusion. Except as provided in paragraph (c) of this section, the requirements in this part do not apply to:

(1) Activities that are regulated through a license by the Nuclear Regulatory Commission or a State under an Agreement with the Nuclear Regulatory commission, including activities certified by the Nuclear Regulatory Commission under section 1701 of the Atomic Energy Act;

(2) Activities conducted under the authority of the Deputy Administrator for Naval Reactors, as described in Pub. L. 98-525 and 106-65;

(3) Activities conducted under the Nuclear Explosives and Weapons Surety Program relating to the prevention of accidental or unauthorized nuclear detonations;

(4) DOE activities conducted outside the United States on territory under the jurisdiction of a foreign government to the extent governed by occupational radiation protection requirements agreed to between the United States and the cognizant government;

(5) Background radiation, radiation doses received as a patient for the purposes of medical diagnosis or therapy, or radiation doses received from participation as a subject in medical research programs; or

(6) Radioactive material on or within material, equipment, and real property which is approved for release when the radiological conditions of the material, equipment, and real property have been documented to comply with the criteria for release set forth in a DOE authorized limit which has been approved by a Secretarial Officer in consultation with the Director, Office of Environment, Health, Safety and Security.

(7) Radioactive material transportation not performed by DOE or a DOE contractor.

(c) Occupational doses received as a result of excluded activities and radioactive material transportation listed in paragraphs (b)(1) through (b)(4) and (b)(7) of this section, shall be included to the extent practicable when determining compliance with the occupational dose limits at §§ 835.202 and 835.207, and with the limits for the embryo/fetus at § 835.206. Occupational doses resulting from authorized emergency exposures and planned special exposures shall not be considered when determining compliance with the dose limits at §§ 835.202 and 835.207.

(d) The requirements in subparts F and G of this part do not apply to radioactive material transportation by DOE or a DOE contractor conducted:

(1) Under the continuous observation and control of an individual who is knowledgeable of and implements required exposure control measures, or

(2) In accordance with Department of Transportation regulations or DOE orders that govern such movements.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59679, Nov. 4, 1998; 71 FR 68733, Nov. 28, 2006; 72 FR 31922, June 8, 2007; 80 FR 5008, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 835.2 Definitions.

(a) As used in this part:

Accountable sealed radioactive source means a sealed radioactive source having a half-life equal to or greater than 30 days and an isotopic activity equal to or greater than the corresponding value provided in appendix E of this part.

Activity Median Aerodynamic Diameter (AMAD) means a particle size in an aerosol where fifty percent of the activity in the aerosol is associated with particles of aerodynamic diameter greater than the AMAD.

Airborne radioactive material or airborne radioactivity means radioactive material dispersed in the air in the form of dusts, fumes, particulates, mists, vapors, or gases.

Airborne radioactivity area means any area, accessible to individuals, where:

(1) The concentration of airborne radioactivity, above natural background, exceeds or is likely to exceed the derived air concentration (DAC) values listed in appendix A or appendix C of this part; or

(2) An individual present in the area without respiratory protection could receive an intake exceeding 12 DAC-hours in a week.

ALARA means “As Low As is Reasonably Achievable,” which is the approach to radiation protection to manage and control exposures (both individual and collective) to the work force and to the general public to as low as is reasonable, taking into account social, technical, economic, practical, and public policy considerations. As used in this part, ALARA is not a dose limit but a process which has the objective of attaining doses as far below the applicable limits of this part as is reasonably achievable.

Annual limit on intake (ALI) means the derived limit for the amount of radioactive material taken into the body of an adult worker by inhalation or ingestion in a year. ALI is the smaller value of intake of a given radionuclide in a year by the reference man (ICRP Publication 23) that would result in a committed effective dose of 5 rems (0.05 sieverts (Sv)) (1 rem = 0.01 Sv) or a committed equivalent dose of 50 rems (0.5 Sv) to any individual organ or tissue. ALI values for intake by ingestion and inhalation of selected radionuclides are based on International Commission on Radiological Protection Publication 68, Dose Coefficients for Intakes of Radionuclides by Workers, published July, 1994 (ISBN 0 08 042651 4). This document is available from Elsevier Science Inc., Tarrytown, NY.

Authorized limit means a limit on the concentration of residual radioactive material on the surfaces or within the property that has been derived consistent with DOE directives including the as low as is reasonably achievable (ALARA) process requirements, given the anticipated use of the property and has been authorized by DOE to permit the release of the property from DOE radiological control.

Background means radiation from:

(1) Naturally occurring radioactive materials which have not been technologically enhanced;

(2) Cosmic sources;

(3) Global fallout as it exists in the environment (such as from the testing of nuclear explosive devices);

(4) Radon and its progeny in concentrations or levels existing in buildings or the environment which have not been elevated as a result of current or prior activities; and

(5) Consumer products containing nominal amounts of radioactive material or producing nominal amounts of radiation.

Bioassay means the determination of kinds, quantities, or concentrations, and, in some cases, locations of radioactive material in the human body, whether by direct measurement or by analysis and evaluation of radioactive materials excreted or removed from the human body.

Calibration means to adjust and/or determine either:

(1) The response or reading of an instrument relative to a standard (e.g., primary, secondary, or tertiary) or to a series of conventionally true values; or

(2) The strength of a radiation source relative to a standard (e.g., primary, secondary, or tertiary) or conventionally true value.

Contamination area means any area, accessible to individuals, where removable surface contamination levels exceed or are likely to exceed the removable surface contamination values specified in appendix D of this part, but do not exceed 100 times those values.

Controlled area means any area to which access is managed by or for DOE to protect individuals from exposure to radiation and/or radioactive material.

Declared pregnant worker means a woman who has voluntarily declared to her employer, in writing, her pregnancy for the purpose of being subject to the occupational dose limits to the embryo/fetus as provided in § 835.206. This declaration may be revoked, in writing, at any time by the declared pregnant worker.

Derived air concentration (DAC) means, for the radionuclides listed in appendix A of this part, the airborne concentration that equals the ALI divided by the volume of air breathed by an average worker for a working year of 2000 hours (assuming a breathing volume of 2400 m 3). For the radionuclides listed in appendix C of this part, the air immersion DACs were calculated for a continuous, non-shielded exposure via immersion in a semi-infinite cloud of radioactive material. Except as noted in the footnotes to appendix A of this part, the values are based on dose coefficients from International Commission on Radiological Protection Publication 68, Dose Coefficients for Intakes of Radionuclides by Workers, published July, 1994 (ISBN 0 08 042651 4) and the associated ICRP computer program, The ICRP Database of Dose Coefficients: Workers and Members of the Public, (ISBN 0 08 043 8768). These materials are available from Elsevier Science Inc., Tarrytown, NY.

Derived air concentration-hour (DAC-hour) means the product of the concentration of radioactive material in air (expressed as a fraction or multiple of the DAC for each radionuclide) and the time of exposure to that radionuclide, in hours.

Deterministic effects means effects due to radiation exposure for which the severity varies with the dose and for which a threshold normally exists (e.g., radiation-induced opacities within the lens of the eye).

DOE means the United States Department of Energy.

DOE activity means an activity taken for or by DOE in a DOE operation or facility that has the potential to result in the occupational exposure of an individual to radiation or radioactive material. The activity may be, but is not limited to, design, construction, operation, or decommissioning. To the extent appropriate, the activity may involve a single DOE facility or operation or a combination of facilities and operations, possibly including an entire site or multiple DOE sites.

Entrance or access point means any location through which an individual could gain access to areas controlled for the purpose of radiation protection. This includes entry or exit portals of sufficient size to permit human entry, irrespective of their intended use.

General employee means an individual who is either a DOE or DOE contractor employee; an employee of a subcontractor to a DOE contractor; or an individual who performs work for or in conjunction with DOE or utilizes DOE facilities.

High contamination area means any area, accessible to individuals, where removable surface contamination levels exceed or are likely to exceed 100 times the removable surface contamination values specified in appendix D of this part.

High radiation area means any area, accessible to individuals, in which radiation levels could result in an individual receiving an equivalent dose to the whole body in excess of 0.1 rems (0.001 Sv) in 1 hour at 30 centimeters from the radiation source or from any surface that the radiation penetrates.

Individual means any human being.

Member of the public means an individual who is not a general employee. An individual is not a “member of the public” during any period in which the individual receives an occupational dose.

Minor means an individual less than 18 years of age.

Monitoring means the measurement of radiation levels, airborne radioactivity concentrations, radioactive contamination levels, quantities of radioactive material, or individual doses and the use of the results of these measurements to evaluate radiological hazards or potential and actual doses resulting from exposures to ionizing radiation.

Occupational dose means an individual's ionizing radiation dose (external and internal) as a result of that individual's work assignment. Occupational dose does not include doses received as a medical patient or doses resulting from background radiation or participation as a subject in medical research programs.

Person means any individual, corporation, partnership, firm, association, trust, estate, public or private institution, group, Government agency, any State or political subdivision of, or any political entity within a State, any foreign government or nation or other entity, and any legal successor, representative, agent or agency of the foregoing; provided that person does not include DOE or the United States Nuclear Regulatory Commission.

Radiation means ionizing radiation: alpha particles, beta particles, gamma rays, X-rays, neutrons, high-speed electrons, high-speed protons, and other particles capable of producing ions. Radiation, as used in this part, does not include non-ionizing radiation, such as radio waves or microwaves, or visible, infrared, or ultraviolet light.

Radiation area means any area, accessible to individuals, in which radiation levels could result in an individual receiving an equivalent dose to the whole body in excess of 0.005 rem (0.05 mSv) in 1 hour at 30 centimeters from the source or from any surface that the radiation penetrates.

Radioactive material area means any area within a controlled area, accessible to individuals, in which items or containers of radioactive material exist and the total activity of radioactive material exceeds the applicable values provided in appendix E of this part.

Radioactive material transportation means the movement of radioactive material by aircraft, rail, vessel, or highway vehicle. Radioactive material transportation does not include preparation of material or packagings for transportation, storage of material awaiting transportation, or application of markings and labels required for transportation.

Radiological area means any area within a controlled area defined in this section as a “radiation area,” “high radiation area,” “very high radiation area,” “contamination area,” “high contamination area,” or “airborne radioactivity area.”

Radiological worker means a general employee whose job assignment involves operation of radiation producing devices or working with radioactive materials, or who is likely to be routinely occupationally exposed above 0.1 rem (0.001 Sv) per year total effective dose.

Real property means land and anything permanently affixed to the land such as buildings, fences and those things attached to the buildings, such as light fixtures, plumbing and heating fixtures.

Real-time air monitoring means measurement of the concentrations or quantities of airborne radioactive materials on a continuous basis.

Respiratory protective device means an apparatus, such as a respirator, worn by an individual for the purpose of reducing the individual's intake of airborne radioactive materials.

Sealed radioactive source means a radioactive source manufactured, obtained, or retained for the purpose of utilizing the emitted radiation. The sealed radioactive source consists of a known or estimated quantity of radioactive material contained within a sealed capsule, sealed between layer(s) of non-radioactive material, or firmly fixed to a non-radioactive surface by electroplating or other means intended to prevent leakage or escape of the radioactive material. Sealed radioactive sources do not include reactor fuel elements, nuclear explosive devices, and radioisotope thermoelectric generators.

Source leak test means a test to determine if a sealed radioactive source is leaking radioactive material.

Special tritium compound (STC) means any compound, except for H2O, that contains tritium, either intentionally (e.g., by synthesis) or inadvertently (e.g., by contamination mechanisms).

Stochastic effects means malignant and hereditary diseases for which the probability of an effect occurring, rather than its severity, is regarded as a function of dose without a threshold, for radiation protection purposes.

Very high radiation area means any area, accessible to individuals, in which radiation levels could result in an individual receiving an absorbed dose in excess of 500 rads (5 grays) in one hour at 1 meter from a radiation source or from any surface that the radiation penetrates.

Week means a period of seven consecutive days.

Year means the period of time beginning on or near January 1 and ending on or near December 31 of that same year used to determine compliance with the provisions of this part. The starting and ending date of the year used to determine compliance may be changed, provided that the change is made at the beginning of the year and that no day is omitted or duplicated in consecutive years.

(b) As used in this part to describe various aspects of radiation dose:

Absorbed dose (D) means the average energy imparted by ionizing radiation to the matter in a volume element per unit mass of irradiated material. The absorbed dose is expressed in units of rad (or gray) (1 rad = 0.01 gray).

Committed effective dose (E50) means the sum of the committed equivalent doses to various tissues or organs in the body (HT,50), each multiplied by the appropriate tissue weighting factor (wT)—that is, E50 = ΣwTHT,50 + wRemainderHRemainder,50. Where wRemainder is the tissue weighting factor assigned to the remainder organs and tissues and HRemainder,50 is the committed equivalent dose to the remainder organs and tissues. Committed effective dose is expressed in units of rem (or Sv).

Committed equivalent dose (HT,50) means the equivalent dose calculated to be received by a tissue or organ over a 50-year period after the intake of a radionuclide into the body. It does not include contributions from radiation sources external to the body. Committed equivalent dose is expressed in units of rem (or Sv).

Cumulative total effective dose means the sum of all total effective dose values recorded for an individual plus, for occupational exposures received before the implementation date of this amendment, the cumulative total effective dose equivalent (as defined in the November 4, 1998 amendment to this rule) values recorded for an individual, where available, for each year occupational dose was received, beginning January 1, 1989.

Dose is a general term for absorbed dose, equivalent dose, effective dose, committed equivalent dose, committed effective dose, or total effective dose as defined in this part.

Effective dose (E) means the summation of the products of the equivalent dose received by specified tissues or organs of the body (HT) and the appropriate tissue weighting factor (wT)—that is, E = ΣwTHT. It includes the dose from radiation sources internal and/or external to the body. For purposes of compliance with this part, equivalent dose to the whole body may be used as effective dose for external exposures. The effective dose is expressed in units of rem (or Sv).

Equivalent dose (HT) means the product of average absorbed dose (DT,R) in rad (or gray) in a tissue or organ (T) and a radiation (R) weighting factor (wR). For external dose, the equivalent dose to the whole body is assessed at a depth of 1 cm in tissue; the equivalent dose to the lens of the eye is assessed at a depth of 0.3 cm in tissue, and the equivalent dose to the extremity and skin is assessed at a depth of 0.007 cm in tissue. Equivalent dose is expressed in units of rem (or Sv).

External dose or exposure means that portion of the equivalent dose received from radiation sources outside the body (i.e., “external sources”).

Extremity means hands and arms below the elbow or feet and legs below the knee.

Internal dose or exposure means that portion of the equivalent dose received from radioactive material taken into the body (i.e., “internal sources”).

Radiation weighting factor (wR) means the modifying factor used to calculate the equivalent dose from the average tissue or organ absorbed dose; the absorbed dose (expressed in rad or gray) is multiplied by the appropriate radiation weighting factor. The radiation weighting factors to be used for determining equivalent dose in rem are as follows:

Radiation Weighting Factors 1, wR

Type and energy range | Radiation weighting factor

Photons, electrons and muons, all energies | 1

Neutrons, energy <10 keV 2 3 | 5

Neutrons, energy 10 keV to 100 keV 2 3 | 10

Neutrons, energy >100 keV to 2 MeV 2 3 | 20

Neutrons, energy >2 MeV to 20 MeV 2 3 | 10

Neutrons, energy >20 MeV 2 3 | 5

Protons, other than recoil protons, energy >2 MeV | 5

Alpha particles, fission fragments, heavy nuclei | 20

1 All values relate to the radiation incident on the body or, for internal sources, emitted from the source.

2 When spectral data are insufficient to identify the energy of the neutrons, a radiation weighting factor of 20 shall be used.

3 When spectral data are sufficient to identify the energy of the neutrons, the following equation may be used to determine a neutron radiation weighting factor value:

Tissue weighting factor (wT) means the fraction of the overall health risk, resulting from uniform, whole body irradiation, attributable to specific tissue (T). The equivalent dose to tissue, (HT), is multiplied by the appropriate tissue weighting factor to obtain the effective dose (E) contribution from that tissue. The tissue weighting factors are as follows:

Tissue Weighting Factors for Various Organs and Tissues

Organs or tissues, T | Tissue weighting factor, wT

Gonads | 0.20

Red bone marrow | 0.12

Colon | 0.12

Lungs | 0.12

Stomach | 0.12

Bladder | 0.05

Breast | 0.05

Liver | 0.05

Esophagus | 0.05

Thyroid | 0.05

Skin | 0.01

Bone surfaces | 0.01

Remainder 1 | 0.05

Whole body 2 | 1.00

1 “Remainder” means the following additional tissues and organs and their masses, in grams, following parenthetically: adrenals (14), brain (1400), extrathoracic airways (15), small intestine (640), kidneys (310), muscle (28,000), pancreas (100), spleen (180), thymus (20), and uterus (80). The equivalent dose to the remainder tissues (Hremainder), is normally calculated as the mass-weighted mean dose to the preceding ten organs and tissues. In those cases in which the most highly irradiated remainder tissue or organ receives the highest equivalent dose of all the organs, a weighting factor of 0.025 (half of remainder) is applied to that tissue or organ and 0.025 (half of remainder) to the mass-weighted equivalent dose in the rest of the remainder tissues and organs to give the remainder equivalent dose.

2 For the case of uniform external irradiation of the whole body, a tissue weighting factor (wT) equal to 1 may be used in determination of the effective dose.

Total effective dose (TED) means the sum of the effective dose (for external exposures) and the committed effective dose.

Whole body means, for the purposes of external exposure, head, trunk (including male gonads), arms above and including the elbow, or legs above and including the knee.

(c) Terms defined in the Atomic Energy Act of 1954 or in 10 CFR part 820 and not defined in this part are used consistent with their meanings given in the Atomic Energy Act of 1954 or in 10 CFR part 820.

[72 FR 31922, June 8, 2007, as amended at 74 FR 18116, Apr. 21, 2009]

§ 835.3 General rule.

(a) No person or DOE personnel shall take or cause to be taken any action inconsistent with the requirements of:

(1) This part; or

(2) Any program, plan, schedule, or other process established by this part.

(b) With respect to a particular DOE activity, contractor management shall be responsible for compliance with the requirements of this part.

(c) Where there is no contractor for a DOE activity, DOE shall ensure implementation of and compliance with the requirements of this part.

(d) Nothing in this part shall be construed as limiting actions that may be necessary to protect health and safety.

(e) For those activities that are required by §§ 835.102, 835.901(e), 835.1202 (a), and 835.1202(b), the time interval to conduct these activities may be extended by a period not to exceed 30 days to accommodate scheduling needs.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998]

§ 835.4 Radiological units.

Unless otherwise specified, the quantities used in the records required by this part shall be clearly indicated in special units of curie, rad, roentgen, or rem, including multiples and subdivisions of these units, or other conventional units, such as, dpm, dpm/100 cm 2 or mass units. The SI units, becquerel (Bq), gray (Gy), and sievert (Sv), may be provided parenthetically for reference with scientific standards.

[72 FR 31925, June 8, 2007]

Subpart B Management and Administrative Requirements

§ 835.101 Radiation protection programs.

(a) A DOE activity shall be conducted in compliance with a documented radiation protection program (RPP) as approved by the DOE.

(b) The DOE may direct or make modifications to a RPP.

(c) The content of each RPP shall be commensurate with the nature of the activities performed and shall include formal plans and measures for applying the as low as reasonably achievable (ALARA) process to occupational exposure.

(d) The RPP shall specify the existing and/or anticipated operational tasks that are intended to be within the scope of the RPP. Except as provided in § 835.101(h), any task outside the scope of a RPP shall not be initiated until an update of the RPP is approved by DOE.

(e) The content of the RPP shall address, but shall not necessarily be limited to, each requirement in this part.

(f) The RPP shall include plans, schedules, and other measures for achieving compliance with regulations of this part. Unless otherwise specified in this part, compliance with the amendments to this part published on June 8, 2007 shall be achieved no later than July 9, 2010.

(g) An update of the RPP shall be submitted to DOE:

(1) Whenever a change or an addition to the RPP is made;

(2) Prior to the initiation of a task not within the scope of the RPP; or

(3) Within 180 days of the effective date of any modifications to this part.

(h) Changes, additions, or updates to the RPP may become effective without prior Department approval only if the changes do not decrease the effectiveness of the RPP and the RPP, as changed, continues to meet the requirements of this part. Proposed changes that decrease the effectiveness of the RPP shall not be implemented without submittal to and approval by the Department.

(i) An initial RPP or an update shall be considered approved 180 days after its submission unless rejected by DOE at an earlier date.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998; 72 FR 31925, June 8, 2007]

§ 835.102 Internal audits.

Internal audits of the radiation protection program, including examination of program content and implementation, shall be conducted through a process that ensures that all functional elements are reviewed no less frequently than every 36 months.

[63 FR 59682, Nov. 4, 1998]

§ 835.103 Education, training and skills.

Individuals responsible for developing and implementing measures necessary for ensuring compliance with the requirements of this part shall have the appropriate education, training, and skills to discharge these responsibilities.

[63 FR 59682, Nov. 4, 1998]

§ 835.104 Written procedures.

Written procedures shall be developed and implemented as necessary to ensure compliance with this part, commensurate with the radiological hazards created by the activity and consistent with the education, training, and skills of the individuals exposed to those hazards.

[63 FR 59682, Nov. 4, 1998]

Subpart C Standards for Internal and External Exposure

§ 835.201 [Reserved]
§ 835.202 Occupational dose limits for general employees.

(a) Except for planned special exposures conducted consistent with § 835.204 and emergency exposures authorized in accordance with § 835.1302, the occupational dose received by general employees shall be controlled such that the following limits are not exceeded in a year:

(1) A total effective dose of 5 rems (0.05 Sv);

(2) The sum of the equivalent dose to the whole body for external exposures and the committed equivalent dose to any organ or tissue other than the skin or the lens of the eye of 50 rems (0.5 Sv);

(3) An equivalent dose to the lens of the eye of 15 rems (0.15 Sv); and

(4) The sum of the equivalent dose to the skin or to any extremity for external exposures and the committed equivalent dose to the skin or to any extremity of 50 rems (0.5 Sv).

(b) All occupational doses received during the current year, except doses resulting from planned special exposures conducted in compliance with § 835.204 and emergency exposures authorized in accordance with § 835.1302, shall be included when demonstrating compliance with §§ 835.202(a) and 835.207.

(c) Doses from background, therapeutic and diagnostic medical radiation, and participation as a subject in medical research programs shall not be included in dose records or in the assessment of compliance with the occupational dose limits.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998; 72 FR 31926, June 8, 2007]

§ 835.203 Combining internal and external equivalent doses.

(a) The total effective dose during a year shall be determined by summing the effective dose from external exposures and the committed effective dose from intakes during the year.

(b) Determinations of the effective dose shall be made using the radiation and tissue weighting factor values provided in § 835.2.

[72 FR 31926, June 8, 2007]

§ 835.204 Planned special exposures.

(a) A planned special exposure may be authorized for a radiological worker to receive doses in addition to and accounted for separately from the doses received under the limits specified in § 835.202(a), provided that each of the following conditions is satisfied:

(1) The planned special exposure is considered only in an exceptional situation when alternatives that might prevent a radiological worker from exceeding the limits in § 835.202(a) are unavailable or impractical;

(2) The contractor management (and employer, if the employer is not the contractor) specifically requests the planned special exposure, in writing; and

(3) Joint written approval is received from the appropriate DOE Headquarters program office and the Secretarial Officer responsible for environment, safety and health matters.

(b) Prior to requesting an individual to participate in an authorized planned special exposure, the individual's dose from all previous planned special exposures and all doses in excess of the occupational dose limits shall be determined.

(c) An individual shall not receive a planned special exposure that, in addition to the doses determined in § 835.204(b), would result in a dose exceeding the following:

(1) In a year, the numerical values of the dose limits established at § 835.202(a); and

(2) Over the individual's lifetime, five times the numerical values of the dose limits established at § 835.202(a).

(d) Prior to a planned special exposure, written consent shall be obtained from each individual involved. Each such written consent shall include:

(1) The purpose of the planned operations and procedures to be used;

(2) The estimated doses and associated potential risks and specific radiological conditions and other hazards which might be involved in performing the task; and

(3) Instructions on the measures to be taken to keep the dose ALARA considering other risks that may be present.

(e) Records of the conduct of a planned special exposure shall be maintained and a written report submitted within 30 days after the planned special exposure to the approving organizations identified in § 835.204(a)(3).

(f) The dose from planned special exposures is not to be considered in controlling future occupational dose of the individual under § 835.202(a), but is to be included in records and reports required under this part.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998]

§ 835.205 Determination of compliance for non-uniform exposure of the skin.

(a) Non-uniform exposures of the skin from X-rays, beta radiation, and/or radioactive material on the skin are to be assessed as specified in this section.

(b) For purposes of demonstrating compliance with § 835.202(a)(4), assessments shall be conducted as follows:

(1) Area of skin irradiated is 100 cm2 or more. The non-uniform equivalent dose received during the year shall be averaged over the 100 cm 2 of the skin receiving the maximum dose, added to any uniform equivalent dose also received by the skin, and recorded as the equivalent dose to any extremity or skin for the year.

(2) Area of skin irradiated is 10 cm2 or more, but is less than 100 cm2. The non-uniform equivalent dose (H) to the irradiated area received during the year shall be added to any uniform equivalent dose also received by the skin and recorded as the equivalent dose to any extremity or skin for the year. H is the equivalent dose averaged over the 1 cm 2 of skin receiving the maximum absorbed dose, D, reduced by the fraction f, which is the irradiated area in cm 2 divided by 100 cm 2 (i.e., H = fD). In no case shall a value of f less than 0.1 be used.

(3) Area of skin irradiated is less than 10 cm2. The non-uniform equivalent dose shall be averaged over the 1 cm 2 of skin receiving the maximum dose. This equivalent dose shall:

(i) Be recorded in the individual's occupational exposure history as a special entry; and

(ii) Not be added to any other equivalent dose to any extremity or skin for the year.

[58 FR 65485, Dec. 14, 1993, as amended at 72 FR 31926, June 8, 2007]

§ 835.206 Limits for the embryo/fetus.

(a) The equivalent dose limit for the embryo/fetus from the period of conception to birth, as a result of occupational exposure of a declared pregnant worker, is 0.5 rem (0.005 Sv).

(b) Substantial variation above a uniform exposure rate that would satisfy the limits provided in § 835.206(a) shall be avoided.

(c) If the equivalent dose to the embryo/fetus is determined to have already exceeded 0.5 rem (0.005 Sv) by the time a worker declares her pregnancy, the declared pregnant worker shall not be assigned to tasks where additional occupational exposure is likely during the remaining gestation period.

[58 FR 65485, Dec. 14, 1993, as amended at 72 FR 31926, June 8, 2007]

§ 835.207 Occupational dose limits for minors.

The dose limits for minors occupationally exposed to radiation and/or radioactive materials at a DOE activity are 0.1 rem (0.001 Sv) total effective dose in a year and 10 percent of the occupational dose limits specified at § 835.202(a)(3) and (a)(4).

[72 FR 31926, June 8, 2007]

§ 835.208 Limits for members of the public entering a controlled area.

The total effective dose limit for members of the public exposed to radiation and/or radioactive material during access to a controlled area is 0.1 rem (0.001 Sv) in a year.

[72 FR 31926, June 8, 2007]

§ 835.209 Concentrations of radioactive material in air.

(a) The derived air concentration (DAC) values given in appendices A and C of this part shall be used in the control of occupational exposures to airborne radioactive material.

(b) The estimation of internal dose shall be based on bioassay data rather than air concentration values unless bioassay data are:

(1) Unavailable;

(2) Inadequate; or

(3) Internal dose estimates based on air concentration values are demonstrated to be as or more accurate.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998]

D Subpart D [Reserved]

Subpart E Monitoring of Individuals and Areas

§ 835.401 General requirements.

(a) Monitoring of individuals and areas shall be performed to:

(1) Demonstrate compliance with the regulations in this part;

(2) Document radiological conditions;

(3) Detect changes in radiological conditions;

(4) Detect the gradual buildup of radioactive material;

(5) Verify the effectiveness of engineered and administrative controls in containing radioactive material and reducing radiation exposure; and

(6) Identify and control potential sources of individual exposure to radiation and/or radioactive material.

(b) Instruments and equipment used for monitoring shall be:

(1) Periodically maintained and calibrated on an established frequency;

(2) Appropriate for the type(s), levels, and energies of the radiation(s) encountered;

(3) Appropriate for existing environmental conditions; and

(4) Routinely tested for operability.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59682, Nov. 4, 1998; 72 FR 31926, June 8, 2007]

§ 835.402 Individual monitoring.

(a) For the purpose of monitoring individual exposures to external radiation, personnel dosimeters shall be provided to and used by:

(1) Radiological workers who, under typical conditions, are likely to receive one or more of the following:

(i) An effective dose of 0.1 rem (0.001 Sv) or more in a year;

(ii) An equivalent dose to the skin or to any extremity of 5 rems (0.05 Sv) or more in a year;

(iii) An equivalent dose to the lens of the eye of 1.5 rems (0.015 Sv) or more in a year;

(2) Declared pregnant workers who are likely to receive from external sources an equivalent dose to the embryo/fetus in excess of 10 percent of the applicable limit at § 835.206(a);

(3) Occupationally exposed minors likely to receive a dose in excess of 50 percent of the applicable limits at § 835.207 in a year from external sources;

(4) Members of the public entering a controlled area likely to receive a dose in excess of 50 percent of the limit at § 835.208 in a year from external sources; and

(5) Individuals entering a high or very high radiation area.

(b) External dose monitoring programs implemented to demonstrate compliance with § 835.402(a) shall be adequate to demonstrate compliance with the dose limits established in subpart C of this part and shall be:

(1) Accredited, or excepted from accreditation, in accordance with the DOE Laboratory Accreditation Program for Personnel Dosimetry; or

(2) Determined by the Secretarial Officer responsible for environment, safety and health matters to have performance substantially equivalent to that of programs accredited under the DOE Laboratory Accreditation Program for Personnel Dosimetry.

(c) For the purpose of monitoring individual exposures to internal radiation, internal dosimetry programs (including routine bioassay programs) shall be conducted for:

(1) Radiological workers who, under typical conditions, are likely to receive a committed effective dose of 0.1 rem (0.001 Sv) or more from all occupational radionuclide intakes in a year;

(2) Declared pregnant workers likely to receive an intake or intakes resulting in an equivalent dose to the embryo/fetus in excess of 10 percent of the limit stated at § 835.206(a);

(3) Occupationally exposed minors who are likely to receive a dose in excess of 50 percent of the applicable limit stated at § 835.207 from all radionuclide intakes in a year; or

(4) Members of the public entering a controlled area likely to receive a dose in excess of 50 percent of the limit stated at § 835.208 from all radionuclide intakes in a year.

(d) Internal dose monitoring programs implemented to demonstrate compliance with § 835.402(c) shall be adequate to demonstrate compliance with the dose limits established in subpart C of this part and shall be:

(1) Accredited, or excepted from accreditation, in accordance with the DOE Laboratory Accreditation Program for Radiobioassay; or,

(2) Determined by the Secretarial Officer responsible for environment, safety and health matters to have performance substantially equivalent to that of programs accredited under the DOE Laboratory Accreditation Program for Radiobioassy.

[63 FR 59683, Nov. 4, 1998, as amended at 72 FR 31926, June 8, 2007]

§ 835.403 Air monitoring.

(a) Monitoring of airborne radioactivity shall be performed:

(1) Where an individual is likely to receive an exposure of 40 or more DAC-hours in a year; or

(2) As necessary to characterize the airborne radioactivity hazard where respiratory protective devices for protection against airborne radionuclides have been prescribed.

(b) Real-time air monitoring shall be performed as necessary to detect and provide warning of airborne radioactivity concentrations that warrant immediate action to terminate inhalation of airborne radioactive material.

[63 FR 59683, Nov. 4, 1998]

§ 835.404 [Reserved]
§ 835.405 Receipt of packages containing radioactive material.

(a) If packages containing quantities of radioactive material in excess of a Type A quantity (as defined at 10 CFR 71.4) are expected to be received from radioactive material transportation, arrangements shall be made to either:

(1) Take possession of the package when the carrier offers it for delivery; or

(2) Receive notification as soon as practicable after arrival of the package at the carrier's terminal and to take possession of the package expeditiously after receiving such notification.

(b) Upon receipt from radioactive material transportation, external surfaces of packages known to contain radioactive material shall be monitored if the package:

(1) Is labeled with a Radioactive White I, Yellow II, or Yellow III label (as specified at 49 CFR 172.403 and 172.436-440); or

(2) Has been transported as low specific activity material (as defined at 10 CFR 71.4) on an exclusive use vehicle (as defined at 10 CFR 71.4); or

(3) Has evidence of degradation, such as packages that are crushed, wet, or damaged.

(c) The monitoring required by paragraph (b) of this section shall include:

(1) Measurements of removable contamination levels, unless the package contains only special form (as defined at 10 CFR 71.4) or gaseous radioactive material; and

(2) Measurements of the radiation levels, if the package contains a Type B quantity (as defined at 10 CFR 71.4) of radioactive material.

(d) The monitoring required by paragraph (b) of this section shall be completed as soon as practicable following receipt of the package, but not later than 8 hours after the beginning of the working day following receipt of the package.

(e) Monitoring pursuant to § 835.405(b) is not required for packages transported on a DOE site which have remained under the continuous observation and control of a DOE employee or DOE contractor employee who is knowledgeable of and implements required exposure control measures.

[63 FR 59683, Nov. 4, 1998, as amended at 72 FR 31926, June 8, 2007]

Subpart F Entry Control Program

§ 835.501 Radiological areas.

(a) Personnel entry control shall be maintained for each radiological area.

(b) The degree of control shall be commensurate with existing and potential radiological hazards within the area.

(c) One or more of the following methods shall be used to ensure control:

(1) Signs and barricades;

(2) Control devices on entrances;

(3) Conspicuous visual and/or audible alarms;

(4) Locked entrance ways; or

(5) Administrative controls.

(d) Written authorizations shall be required to control entry into and perform work within radiological areas. These authorizations shall specify radiation protection measures commensurate with the existing and potential hazards.

(e) No control(s) shall be installed at any radiological area exit that would prevent rapid evacuation of personnel under emergency conditions.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59684, Nov. 4, 1998]

§ 835.502 High and very high radiation areas.

(a) The following measures shall be implemented for each entry into a high radiation area:

(1) The area shall be monitored as necessary during access to determine the exposure rates to which the individuals are exposed; and

(2) Each individual shall be monitored by a supplemental dosimetry device or other means capable of providing an immediate estimate of the individual's integrated equivalent dose to the whole body during the entry.

(b) Physical controls. One or more of the following features shall be used for each entrance or access point to a high radiation area where radiation levels exist such that an individual could exceed an equivalent dose to the whole body of 1 rem (0.01 sievert) in any one hour at 30 centimeters from the source or from any surface that the radiation penetrates:

(1) A control device that prevents entry to the area when high radiation levels exist or upon entry causes the radiation level to be reduced below that level defining a high radiation area;

(2) A device that functions automatically to prevent use or operation of the radiation source or field while individuals are in the area;

(3) A control device that energizes a conspicuous visible or audible alarm signal so that the individual entering the high radiation area and the supervisor of the activity are made aware of the entry;

(4) Entryways that are locked. During periods when access to the area is required, positive control over each entry is maintained;

(5) Continuous direct or electronic surveillance that is capable of preventing unauthorized entry;

(6) A control device that will automatically generate audible and visual alarm signals to alert personnel in the area before use or operation of the radiation source and in sufficient time to permit evacuation of the area or activation of a secondary control device that will prevent use or operation of the source.

(c) Very high radiation areas. In addition to the above requirements, additional measures shall be implemented to ensure individuals are not able to gain unauthorized or inadvertent access to very high radiation areas.

(d) No control(s) shall be established in a high or very high radiation area that would prevent rapid evacuation of personnel.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59684, Nov. 4, 1998; 72 FR 31926, June 8, 2007]

Subpart G Posting and Labeling

§ 835.601 General requirements.

(a) Except as otherwise provided in this subpart, postings and labels required by this subpart shall include the standard radiation warning trefoil in black or magenta imposed upon a yellow background.

(b) Signs required by this subpart shall be clearly and conspicuously posted and may include radiological protection instructions.

(c) The posting and labeling requirements in this subpart may be modified to reflect the special considerations of DOE activities conducted at private residences or businesses. Such modifications shall provide the same level of protection to individuals as the existing provisions in this subpart.

[63 FR 59684, Nov. 4, 1998]

§ 835.602 Controlled areas.

(a) Each access point to a controlled area (as defined at § 835.2) shall be posted whenever radiological areas or radioactive material areas exist in the area. Individuals who enter only controlled areas without entering radiological areas or radioactive material areas are not expected to receive a total effective dose of more than 0.1 rem (0.001 sievert) in a year.

(b) Signs used for this purpose may be selected by the contractor to avoid conflict with local security requirements.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59684, Nov. 4, 1998; 72 FR 31926, June 8, 2007]

§ 835.603 Radiological areas and radioactive material areas.

Each access point to radiological areas and radioactive material areas (as defined at § 835.2) shall be posted with conspicuous signs bearing the wording provided in this section.

(a) Radiation area. The words “Caution, Radiation Area” shall be posted at each radiation area.

(b) High radiation area. The words “Caution, High Radiation Area” or “Danger, High Radiation Area” shall be posted at each high radiation area.

(c) Very high radiation area. The words “Grave Danger, Very High Radiation Area” shall be posted at each very high radiation area.

(d) Airborne radioactivity area. The words “Caution, Airborne Radioactivity Area” or “Danger, Airborne Radioactivity Area” shall be posted at each airborne radioactivity area.

(e) Contamination area. The words “Caution, Contamination Area” shall be posted at each contamination area.

(f) High contamination area. The words “Caution, High Contamination Area” or “Danger, High Contamination Area” shall be posted at each high contamination area.

(g) Radioactive material area. The words “Caution, Radioactive Material(s)” shall be posted at each radioactive material area.

[63 FR 59684, Nov. 4, 1998]

§ 835.604 Exceptions to posting requirements.

(a) Areas may be excepted from the posting requirements of § 835.603 for periods of less than 8 continuous hours when placed under continuous observation and control of an individual knowledgeable of, and empowered to implement, required access and exposure control measures.

(b) Areas may be excepted from the radioactive material area posting requirements of § 835.603(g) when:

(1) Posted in accordance with §§ 835.603(a) through (f); or

(2) Each item or container of radioactive material is labeled in accordance with this subpart such that individuals entering the area are made aware of the hazard; or

(3) The radioactive material of concern consists solely of structures or installed components which have been activated (i.e., such as by being exposed to neutron radiation or particles produced by an accelerator).

(c) Areas containing only packages received from radioactive material transportation labeled and in non-degraded condition need not be posted in accordance with § 835.603 until the packages are monitored in accordance with § 835.405.

[63 FR 59684, Nov. 4, 1998]

§ 835.605 Labeling items and containers.

Except as provided at § 835.606, each item or container of radioactive material shall bear a durable, clearly visible label bearing the standard radiation warning trefoil and the words “Caution, Radioactive Material” or “Danger, Radioactive Material.” The label shall also provide sufficient information to permit individuals handling, using, or working in the vicinity of the items or containers to take precautions to avoid or control exposures.

[63 FR 59684, Nov. 4, 1998]

§ 835.606 Exceptions to labeling requirements.

(a) Items and containers may be excepted from the radioactive material labeling requirements of § 835.605 when:

(1) Used, handled, or stored in areas posted and controlled in accordance with this subpart and sufficient information is provided to permit individuals to take precautions to avoid or control exposures; or

(2) The quantity of radioactive material is less than one tenth of the values specified in appendix E of this part and less than 0.1 Ci; or

(3) Packaged, labeled, and marked in accordance with the regulations of the Department of Transportation or DOE Orders governing radioactive material transportation; or

(4) Inaccessible, or accessible only to individuals authorized to handle or use them, or to work in the vicinity; or

(5) Installed in manufacturing, process, or other equipment, such as reactor components, piping, and tanks; or

(6) The radioactive material consists solely of nuclear weapons or their components.

(b) Radioactive material labels applied to sealed radioactive sources may be excepted from the color specifications of § 835.601(a).

[63 FR 59684, Nov. 4, 1998, as amended at 72 FR 31927, June 8, 2007]

Subpart H Records

§ 835.701 General provisions.

(a) Records shall be maintained to document compliance with this part and with radiation protection programs required by § 835.101.

(b) Unless otherwise specified in this subpart, records shall be retained until final disposition is authorized by DOE.

§ 835.702 Individual monitoring records.

(a) Except as authorized by § 835.702(b), records shall be maintained to document doses received by all individuals for whom monitoring was conducted and to document doses received during planned special exposures, unplanned doses exceeding the monitoring thresholds of § 835.402, and authorized emergency exposures.

(b) Recording of the non-uniform equivalent dose to the skin is not required if the dose is less than 2 percent of the limit specified for the skin at § 835.202(a)(4). Recording of internal dose (committed effective dose or committed equivalent dose) is not required for any monitoring result estimated to correspond to an individual receiving less than 0.01 rem (0.1 mSv) committed effective dose. The bioassay or air monitoring result used to make the estimate shall be maintained in accordance with § 835.703(b) and the unrecorded internal dose estimated for any individual in a year shall not exceed the applicable monitoring threshold at § 835.402(c).

(c) The records required by this section shall:

(1) Be sufficient to evaluate compliance with subpart C of this part;

(2) Be sufficient to provide dose information necessary to complete reports required by subpart I of this part;

(3) Include the results of monitoring used to assess the following quantities for external dose received during the year:

(i) The effective dose from external sources of radiation (equivalent dose to the whole body may be used as effective dose for external exposure);

(ii) The equivalent dose to the lens of the eye;

(iii) The equivalent dose to the skin; and

(iv) The equivalent dose to the extremities.

(4) Include the following information for internal dose resulting from intakes received during the year:

(i) Committed effective dose;

(ii) Committed equivalent dose to any organ or tissue of concern; and

(iii) Identity of radionuclides.

(5) Include the following quantities for the summation of the external and internal dose:

(i) Total effective dose in a year;

(ii) For any organ or tissue assigned an internal dose during the year, the sum of the equivalent dose to the whole body from external exposures and the committed equivalent dose to that organ or tissue; and

(iii) Cumulative total effective dose.

(6) Include the equivalent dose to the embryo/fetus of a declared pregnant worker.

(d) Documentation of all occupational doses received during the current year, except for doses resulting from planned special exposures conducted in compliance with § 835.204 and emergency exposures authorized in accordance with § 835.1302(d), shall be obtained to demonstrate compliance with § 835.202(a). If complete records documenting previous occupational dose during the year cannot be obtained, a written estimate signed by the individual may be accepted to demonstrate compliance.

(e) For radiological workers whose occupational dose is monitored in accordance with § 835.402, reasonable efforts shall be made to obtain complete records of prior years occupational internal and external doses.

(f) The records specified in this section that are identified with a specific individual shall be readily available to that individual.

(g) Data necessary to allow future verification or reassessment of the recorded doses shall be recorded.

(h) All records required by this section shall be transferred to the DOE upon cessation of activities at the site that could cause exposure to individuals.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59685, Nov. 4, 1998; 72 FR 31927, June 8, 2007]

§ 835.703 Other monitoring records.

The following information shall be documented and maintained:

(a) Results of monitoring for radiation and radioactive material as required by subparts E and L of this part, except for monitoring required by § 835.1102(d);

(b) Results of monitoring used to determine individual occupational dose from external and internal sources;

(c) Results of monitoring for the release and control of material and equipment as required by § 835.1101; and

(d) Results of maintenance and calibration performed on instruments and equipment as required by § 835.401(b).

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59685, Nov. 4, 1998]

§ 835.704 Administrative records.

(a) Training records shall be maintained, as necessary, to demonstrate compliance with §§ 835.901.

(b) Actions taken to maintain occupational exposures as low as reasonably achievable, including the actions required for this purpose by § 835.101, as well as facility design and control actions required by §§ 835.1001, 835.1002, and 835.1003, shall be documented.

(c) Records shall be maintained to document the results of internal audits and other reviews of program content and implementation.

(d) Written declarations of pregnancy, including the estimated date of conception, and revocations of declarations of pregnancy shall be maintained.

(e) Changes in equipment, techniques, and procedures used for monitoring shall be documented.

(f) Records shall be maintained as necessary to demonstrate compliance with the requirements of §§ 835.1201 and 835.1202 for sealed radioactive source control, inventory, and source leak tests.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59685, Nov. 4, 1998]

Subpart I Reports to Individuals

§ 835.801 Reports to individuals.

(a) Radiation exposure data for individuals monitored in accordance with § 835.402 shall be reported as specified in this section. The information shall include the data required under § 835.702(c). Each notification and report shall be in writing and include: the DOE site or facility name, the name of the individual, and the individual's social security number, employee number, or other unique identification number.

(b) Upon the request from an individual terminating employment, records of exposure shall be provided to that individual as soon as the data are available, but not later than 90 days after termination. A written estimate of the radiation dose received by that employee based on available information shall be provided at the time of termination, if requested.

(c) Each DOE- or DOE-contractor-operated site or facility shall, on an annual basis, provide a radiation dose report to each individual monitored during the year at that site or facility in accordance with § 835.402.

(d) Detailed information concerning any individual's exposure shall be made available to the individual upon request of that individual, consistent with the provisions of the Privacy Act (5 U.S.C. 552a).

(e) When a DOE contractor is required to report to the Department, pursuant to Departmental requirements for occurrence reporting and processing, any exposure of an individual to radiation and/or radioactive material, or planned special exposure in accordance with § 835.204(e), the contractor shall also provide that individual with a report on his or her exposure data included therein. Such report shall be transmitted at a time not later than the transmittal to the Department.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59685, Nov. 4, 1998]

Subpart J Radiation Safety Training

§ 835.901 Radiation safety training.

(a) Each individual shall complete radiation safety training on the topics established at § 835.901(c) commensurate with the hazards in the area and the required controls:

(1) Before being permitted unescorted access to controlled areas; and

(2) Before receiving occupational dose during access to controlled areas at a DOE site or facility.

(b) Each individual shall demonstrate knowledge of the radiation safety training topics established at § 835.901(c), commensurate with the hazards in the area and required controls, by successful completion of an examination and performance demonstrations:

(1) Before being permitted unescorted access to radiological areas; and

(2) Before performing unescorted assignments as a radiological worker.

(c) Radiation safety training shall include the following topics, to the extent appropriate to each individual's prior training, work assignments, and degree of exposure to potential radiological hazards:

(1) Risks of exposure to radiation and radioactive materials, including prenatal radiation exposure;

(2) Basic radiological fundamentals and radiation protection concepts;

(3) Physical design features, administrative controls, limits, policies, procedures, alarms, and other measures implemented at the facility to manage doses and maintain doses ALARA, including both routine and emergency actions;

(4) Individual rights and responsibilities as related to implementation of the facility radiation protection program;

(5) Individual responsibilities for implementing ALARA measures required by § 835.101; and

(6) Individual exposure reports that may be requested in accordance with § 835.801.

(d) When an escort is used in lieu of training in accordance with paragraph (a) or (b) of this section, the escort shall:

(1) Have completed radiation safety training, examinations, and performance demonstrations required for entry to the area and performance of the work; and

(2) Ensure that all escorted individuals comply with the documented radiation protection program.

(e) Radiation safety training shall be provided to individuals when there is a significant change to radiation protection policies and procedures that may affect the individual and at intervals not to exceed 24 months. Such training provided for individuals subject to the requirements of § 835.901(b)(1) and (b)(2) shall include successful completion of an examination.

[63 FR 59685, Nov. 4, 1998]

§§ 835.902-835.903 [Reserved]

Subpart K Design and Control

§ 835.1001 Design and control.

(a) Measures shall be taken to maintain radiation exposure in controlled areas ALARA through engineered and administrative controls. The primary methods used shall be physical design features (e.g., confinement, ventilation, remote handling, and shielding). Administrative controls shall be employed only as supplemental methods to control radiation exposure.

(b) For specific activities where use of engineered controls is demonstrated to be impractical, administrative controls shall be used to maintain radiation exposures ALARA.

[63 FR 59686, Nov. 4, 1998, as amended at 72 FR 31927, June 8, 2007]

§ 835.1002 Facility design and modifications.

During the design of new facilities or modification of existing facilities, the following objectives shall be adopted:

(a) Optimization methods shall be used to assure that occupational exposure is maintained ALARA in developing and justifying facility design and physical controls.

(b) The design objective for controlling personnel exposure from external sources of radiation in areas of continuous occupational occupancy (2000 hours per year) shall be to maintain exposure levels below an average of 0.5 millirem (5 µSv) per hour and as far below this average as is reasonably achievable. The design objectives for exposure rates for potential exposure to a radiological worker where occupancy differs from the above shall be ALARA and shall not exceed 20 percent of the applicable standards in § 835.202.

(c) Regarding the control of airborne radioactive material, the design objective shall be, under normal conditions, to avoid releases to the workplace atmosphere and in any situation, to control the inhalation of such material by workers to levels that are ALARA; confinement and ventilation shall normally be used.

(d) The design or modification of a facility and the selection of materials shall include features that facilitate operations, maintenance, decontamination, and decommissioning.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59686, Nov. 4, 1998; 72 FR 31927, June 8, 2007]

§ 835.1003 Workplace controls.

During routine operations, the combination of engineered and administrative controls shall provide that:

(a) The anticipated occupational dose to general employees shall not exceed the limits established at § 835.202; and

(b) The ALARA process is utilized for personnel exposures to ionizing radiation.

[63 FR 59686, Nov. 4, 1998, as amended at 72 FR 31927, June 8, 2007]

Subpart L Radioactive Contamination Control

Source: 63 FR 59686, Nov. 4, 1998, unless otherwise noted.

§ 835.1101 Control of material and equipment.

(a) Except as provided in paragraphs (b) and (c) of this section, material and equipment in contamination areas, high contamination areas, and airborne radioactivity areas shall not be released to a controlled area if:

(1) Removable surface contamination levels on accessible surfaces exceed the removable surface contamination values specified in appendix D of this part; or

(2) Prior use suggests that the removable surface contamination levels on inaccessible surfaces are likely to exceed the removable surface contamination values specified in appendix D of this part.

(b) Material and equipment exceeding the removable surface contamination values specified in appendix D of this part may be conditionally released for movement on-site from one radiological area for immediate placement in another radiological area only if appropriate monitoring is performed and appropriate controls for the movement are established and exercised.

(c) Material and equipment with fixed contamination levels that exceed the total contamination values specified in appendix D of this part may be released for use in controlled areas outside of radiological areas only under the following conditions:

(1) Removable surface contamination levels are below the removable surface contamination values specified in appendix D of this part; and

(2) The material or equipment is routinely monitored and clearly marked or labeled to alert personnel of the contaminated status.

§ 835.1102 Control of areas.

(a) Appropriate controls shall be maintained and verified which prevent the inadvertent transfer of removable contamination to locations outside of radiological areas under normal operating conditions.

(b) Any area in which contamination levels exceed the values specified in appendix D of this part shall be controlled in a manner commensurate with the physical and chemical characteristics of the contaminant, the radionuclides present, and the fixed and removable surface contamination levels.

(c) Areas accessible to individuals where the measured total surface contamination levels exceed, but the removable surface contamination levels are less than, corresponding surface contamination values specified in appendix D of this part, shall be controlled as follows when located outside of radiological areas:

(1) The area shall be routinely monitored to ensure the removable surface contamination level remains below the removable surface contamination values specified in appendix D of this part; and

(2) The area shall be conspicuously marked to warn individuals of the contaminated status.

(d) Individuals exiting contamination, high contamination, or airborne radioactivity areas shall be monitored, as appropriate, for the presence of surface contamination.

(e) Protective clothing shall be required for entry to areas in which removable contamination exists at levels exceeding the removable surface contamination values specified in appendix D of this part.

Subpart M Sealed Radioactive Source Control

Source: 63 FR 59686, Nov. 4, 1998, unless otherwise noted.

§ 835.1201 Sealed radioactive source control.

Sealed radioactive sources shall be used, handled, and stored in a manner commensurate with the hazards associated with operations involving the sources.

§ 835.1202 Accountable sealed radioactive sources.

(a) Each accountable sealed radioactive source shall be inventoried at intervals not to exceed six months. This inventory shall:

(1) Establish the physical location of each accountable sealed radioactive source;

(2) Verify the presence and adequacy of associated postings and labels; and

(3) Establish the adequacy of storage locations, containers, and devices.

(b) Except for sealed radioactive sources consisting solely of gaseous radioactive material or tritium, each accountable sealed radioactive source shall be subject to a source leak test upon receipt, when damage is suspected, and at intervals not to exceed six months. Source leak tests shall be capable of detecting radioactive material leakage equal to or exceeding 0.005 µCi.

(c) Notwithstanding the requirements of paragraph (b) of this section, an accountable sealed radioactive source is not subject to periodic source leak testing if that source has been removed from service. Such sources shall be stored in a controlled location, subject to periodic inventory as required by paragraph (a) of this section, and subject to source leak testing prior to being returned to service.

(d) Notwithstanding the requirements of paragraphs (a) and (b) of this section, an accountable sealed radioactive source is not subject to periodic inventory and source leak testing if that source is located in an area that is unsafe for human entry or otherwise inaccessible.

(e) An accountable sealed radioactive source found to be leaking radioactive material shall be controlled in a manner that minimizes the spread of radioactive contamination.

[63 FR 59686, Nov. 4, 1998, as amended at 72 FR 31927, June 8, 2007]

Subpart N Emergency Exposure Situations

§ 835.1301 General provisions.

(a) A general employee whose occupational dose has exceeded the numerical value of any of the limits specified in § 835.202 as a result of an authorized emergency exposure may be permitted to return to work in radiological areas during the current year providing that all of the following conditions are met:

(1) Approval is first obtained from the contractor management and the Head of the responsible DOE field organization;

(2) The individual receives counseling from radiological protection and medical personnel regarding the consequences of receiving additional occupational exposure during the year; and

(3) The affected employee agrees to return to radiological work.

(b) All doses exceeding the limits specified in § 835.202 shall be recorded in the affected individual's occupational dose record.

(c) When the conditions under which a dose was received in excess of the limits specified in § 835.202, except those received in accordance with § 835.204, have been eliminated, operating management shall notify the Head of the responsible DOE field organization.

(d) Operations which have been suspended as a result of a dose in excess of the limits specified in § 835.202, except those received in accordance with § 835.204, may be resumed only with the approval of DOE.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59687, Nov. 4, 1998; 72 FR 31927, June 8, 2007]

§ 835.1302 Emergency exposure situations.

(a) The risk of injury to those individuals involved in rescue and recovery operations shall be minimized.

(b) Operating management shall weigh actual and potential risks against the benefits to be gained.

(c) No individual shall be required to perform a rescue action that might involve substantial personal risk.

(d) Each individual authorized to perform emergency actions likely to result in occupational doses exceeding the values of the limits provided at § 835.202(a) shall be trained in accordance with § 835.901(b) and briefed beforehand on the known or anticipated hazards to which the individual will be subjected.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59687, Nov. 4, 1998]

§ 835.1303 [Reserved]
§ 835.1304 Nuclear accident dosimetry.

(a) Installations possessing sufficient quantities of fissile material to potentially constitute a critical mass, such that the excessive exposure of individuals to radiation from a nuclear accident is possible, shall provide nuclear accident dosimetry for those individuals.

(b) Nuclear accident dosimetry shall include the following:

(1) A method to conduct initial screening of individuals involved in a nuclear accident to determine whether significant exposures to radiation occurred;

(2) Methods and equipment for analysis of biological materials;

(3) A system of fixed nuclear accident dosimeter units; and

(4) Personal nuclear accident dosimeters.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59687, Nov. 4, 1998]

Appendix A to Part 835 Derived Air Concentrations (DAC) for Controlling Radiation Exposure to Workers at DOE Facilities

The data presented in appendix A are to be used for controlling individual internal doses in accordance with § 835.209, identifying the need for air monitoring in accordance with § 835.403, and identifying and posting airborne radioactivity areas in accordance with § 835.603(d).

The DAC values are given for individual radionuclides. For known mixtures of radionuclides, determine the sum of the ratio of the observed concentration of a particular radionuclide and its corresponding DAC for all radionuclides in the mixture. If this sum exceeds unity (1), then the DAC has been exceeded. For unknown radionuclides, the most restrictive DAC (lowest value) for those isotopes not known to be absent shall be used. For any single radionuclide not listed in appendix A with decay mode other than alpha emission or spontaneous fission and with radioactive half-life greater than two hours, the DAC value shall be 4 E-11 µCi/mL (1 Bq/m 3). For any single radionuclide not listed in appendix A that decays by alpha emission or spontaneous fission the DAC value shall be 2 E-13 µCi/mL (8 E-03 Bq/m 3).

The DACs for limiting radiation exposures through inhalation of radionuclides by workers are listed in this appendix. The values are based on either a stochastic (committed effective dose) dose limit of 5 rems (0.05 Sv) or a deterministic (organ or tissue) dose limit of 50 rems (0.5 Sv) per year, whichever is more limiting.

Note:

The 15 rems (0.15 Sv) dose limit for the lens of the eye does not appear as a critical organ dose limit.

The columns in this appendix contain the following information: (1) Radionuclide; (2) inhaled air DAC for type F (fast), type M (moderate), and type S (slow) materials in units of µCi/mL; (3) inhaled air DAC for type F (fast), type M (moderate), and type S (slow) materials in units of Bq/m 3; (4) an indication of whether or not the DAC for each class is controlled by the stochastic (effective dose) or deterministic (organ or tissue) dose. The absorption types (F, M, and S) have been established to describe the absorption type of the materials from the respiratory tract into the blood. The range of half-times for the absorption types correspond to: Type F, 100% at 10 minutes; Type M, 10% at 10 minutes and 90% at 140 days; and Type S 0.1% at 10 minutes and 99.9% at 7000 days. The DACs are listed by radionuclide, in order of increasing atomic mass, and are based on the assumption that the particle size distribution of 5 micrometers AMAD is used. For situations where the particle size distribution is known to differ significantly from 5 micrometers AMAD, appropriate corrections may be made to both the estimated dose to workers and the DACs.

Radionuclide | Absorption type 3 | Absorption type 3 | Stochastic or organ or tissue 1

µCi/mL | Bq/m 3 | (F/M/S)

F | M | S | F | M | S

H-3 (Water) 2 | 2 E−05 | 2 E−05 | 2 E−05 | 7 E + 05 | 7 E + 05 | 7 E + 05 | St/St/St

H-3 (Elemental) 2 | 2 E−01 | 2 E−01 | 2 E−01 | 9 E + 09 | 9 E + 09 | 9 E + 09 | St/St/St

STCs (Insoluble) 4 | 1 E−05 | 6 E−06 | 2 E−06 | 3 E + 05 | 2 E + 05 | 8 E + 04 | St/St/St

STCs (Soluble) | 1 E−05 | 1 E−05 | 1 E−05 | 5 E + 05 | 5 E + 05 | 5 E + 05 | St/St/St

Be-7 | - | 1 E−05 | 1 E−05 | - | 4 E + 05 | 4 E + 05 | /St/St

Be-10 | - | 8 E−08 | 2 E−08 | - | 3 E + 03 | 1 E + 03 | /St/St

C-11 (Vapor) 2 | - | 1 E−04 | - | - | 6 E + 06 | - | /St/

C-11 (CO) 2 | 4 E−04 | 4 E−04 | 4 E−04 | 1 E + 07 | 1 E + 07 | 1 E + 07 | St/St/St

C-11 (CO2) 2 | 2 E−04 | 2 E−04 | 2 E−04 | 9 E + 06 | 9 E + 06 | 9 E + 06 | St/St/St

C-14 (Vapor) 2 | - | 9 E−07 | - | - | 3 E + 04 | - | /St/

C-14 (CO) 2 | 7 E−04 | 7 E−04 | 7 E−04 | 2 E + 07 | 2 E + 07 | 2 E + 07 | St/St/St

C-14 (CO2) 2 | 8 E−05 | 8 E−05 | 8 E−05 | 3 E + 06 | 3 E + 06 | 3 E + 06 | St/St/St

F-18 | 4 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Na-22 | 2 E−07 | - | - | 1 E + 04 | - | - | E/ /

Na-24 | 4 E−07 | - | - | 1 E + 04 | - | - | ET/ /

Mg-28 | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/St/

Al-26 | 4 E−08 | 4 E−08 | - | 1 E + 03 | 1 E + 03 | - | St/St/

Si-31 | 9 E−06 | 5 E−06 | 5 E−06 | 3 E + 05 | 1 E + 05 | 1 E + 05 | ET/St/St

Si-32 | 1 E−07 | 5 E−08 | 1 E−08 | 5 E + 03 | 2 E + 03 | 3 E + 02 | St/St/St

P-32 | 5 E−07 | 1 E−07 | - | 1 E + 04 | 7 E + 03 | - | St/St/

P-33 | 4 E−06 | 4 E−07 | - | 1 E + 05 | 1 E + 04 | - | St/St/

S-35 (Vapor) | - | 4 E−06 | - | - | 1 E + 05 | - | /St/

S-35 | 7 E−06 | 5 E−07 | - | 2 E + 05 | 1 E + 04 | - | St/St/

Cl-36 | 1 E−06 | 1 E−07 | - | 4 E + 04 | 4 E + 03 | - | St/St/

Cl-38 | 7 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

Cl-39 | 2 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

K-40 | 1 E−07 | - | - | 6 E + 03 | - | - | St/ /

K-42 | 2 E−06 | - | - | 1 E + 05 | - | - | E/ /

K-43 | 9 E−07 | - | - | 3 E + 04 | - | - | ET/ /

K-44 | 8 E−06 | - | - | 2 E + 05 | - | - | ET/ /

K-45 | 9 E−06 | - | - | 3 E + 05 | - | - | ET/ /

Ca-41 | - | 2 E−06 | - | - | 8 E + 04 | - | /BS/

Ca-45 | - | 2 E−07 | - | - | 9 E + 03 | - | /St/

Ca-47 | - | 2 E−07 | - | - | 9 E + 03 | - | /St/

Sc-43 | - | - | 2 E−06 | - | - | 7 E + 04 | / /ET

Sc-44m | - | - | 2 E−07 | - | - | 1 E + 04 | / /St

Sc-44 | - | - | 1 E−06 | - | - | 4 E + 04 | / /ET

Sc-46 | - | - | 1 E−07 | - | - | 4 E + 03 | / /St

Sc-47 | - | - | 7 E−07 | - | - | 2 E + 04 | / /St

Sc-48 | - | - | 2 E−07 | - | - | 1 E + 04 | / /ET

Sc-49 | - | - | 8 E−06 | - | - | 3 E + 05 | / /ET

Ti-44 | 7 E−09 | 2 E−08 | 9 E−09 | 2 E + 02 | 7 E + 02 | 3 E + 02 | St/St/St

Ti-45 | 3 E−06 | 2 E−06 | 2 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

V-47 | 8 E−06 | 6 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

V-48 | 2 E−07 | 2 E−07 | - | 9 E + 03 | 7 E + 03 | - | ET/St/

V-49 | 1 E−05 | 2 E−05 | - | 7 E + 05 | 9 E + 05 | - | BS/St/

Cr-48 | 2 E−06 | 2 E−06 | 2 E−06 | 8 E + 04 | 8 E + 04 | 8 E + 04 | ET/ET/ET

Cr-49 | 7 E−06 | 5 E−06 | 5 E−06 | 2 E + 05 | 2 E + 05 | 2 E + 05 | ET/ET/ET

Cr-51 | 1 E−05 | 1 E−05 | 1 E−05 | 6 E + 05 | 6 E + 05 | 5 E + 05 | St/St/St

Mn-51 | 7 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

Mn-52m | 7 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

Mn-52 | 2 E−07 | 2 E−07 | - | 8 E + 03 | 8 E + 03 | - | ET/ET/

Mn-53 | 5 E−06 | 1 E−05 | - | 2 E + 05 | 5 E + 05 | - | BS/St/

Mn-54 | 5 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | - | St/St/

Mn-56 | 2 E−06 | 2 E−06 | - | 9 E + 04 | 8 E + 04 | - | ET/ET/

Fe-52 | 6 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/E/

Fe-55 | 6 E−07 | 1 E−06 | - | 2 E + 04 | 6 E + 04 | - | St/St/

Fe-59 | 1 E−07 | 1 E−07 | - | 6 E + 03 | 6 E + 03 | - | St/St/

Fe-60 | 1 E−09 | 4 E−09 | - | 6 E + 01 | 1 E + 02 | - | St/St/

Co-55 | - | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | /ET/ET

Co-56 | - | 1 E−07 | 1 E−07 | - | 5 E + 03 | 4 E + 03 | /St/St

Co-57 | - | 1 E−06 | 9 E−07 | - | 5 E + 04 | 3 E + 04 | /St/St

Co-58m | - | 3 E−05 | 3 E−05 | - | 1 E + 06 | 1 E + 06 | /St/St

Co-58 | - | 4 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Co-60m | - | 4 E−04 | 4 E−04 | - | 1 E + 07 | 1 E + 07 | /St/St

Co-60 | - | 7 E−08 | 3 E−08 | - | 2 E + 03 | 1 E + 03 | /St/St

Co-61 | - | 6 E−06 | 6 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

Co-62m | - | 7 E−06 | 6 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

Ni-56 (Inorg) | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/ET/

Ni-56 (Carbonyl) | - | 4 E−07 | - | - | 1 E + 04 | - | /St/

Ni-57 (Inorg) | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/ET/

Ni-57 (Carbonyl) | - | 7 E−07 | - | - | 2 E + 04 | - | /ET/

Ni-59 (Inorg) | 2 E−06 | 5 E−06 | - | 9 E + 04 | 2 E + 05 | - | St/St/

Ni-59 (Carbonyl) | - | 6 E−07 | - | - | 2 E + 04 | - | /St/

Ni-63 (Inorg) | 1 E−06 | 1 E−06 | - | 4 E + 04 | 6 E + 04 | - | St/St/

Ni-63 (Carbonyl) | - | 2 E−07 | - | - | 1 E + 04 | - | /St/

Ni-65 (Inorg) | 5 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Ni-65 (Carbonyl) | - | 8 E−07 | - | - | 3 E + 04 | - | /ET/

Ni-66 (Inorg) | 7 E−07 | 2 E−07 | - | 2 E + 04 | 1 E + 04 | - | St/St/

Ni-66 (Carbonyl) | - | 2 E−07 | - | - | 1 E + 04 | - | /ET/

Cu-60 | 5 E−06 | 4 E−06 | 4 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Cu-61 | 3 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Cu-64 | 4 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/E/E

Cu-67 | 2 E−06 | 1 E−06 | 9 E−07 | 8 E + 04 | 3 E + 04 | 3 E + 04 | ET/St/St

Zn-62 | - | - | 8 E−07 | - | - | 3 E + 04 | / /St

Zn-63 | - | - | 5 E−06 | - | - | 2 E + 05 | / /ET

Zn-65 | - | - | 2 E−07 | - | - | 7 E + 03 | / /St

Zn-69m | - | - | 1 E−06 | - | - | 6 E + 04 | / /St

Zn-69 | - | - | 7 E−06 | - | - | 2 E + 05 | / /ET

Zn-71m | - | - | 1 E−06 | - | - | 5 E + 04 | / /ET

Zn-72 | - | - | 3 E−07 | - | - | 1 E + 04 | / /St

Ga-65 | 1 E−05 | 9 E−06 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

Ga-66 | 8 E−07 | 7 E−07 | - | 3 E + 04 | 2 E + 04 | - | ET/St/

Ga-67 | 3 E−06 | 2 E−06 | - | 1 E + 05 | 7 E + 04 | - | ET/St/

Ga-68 | 6 E−06 | 4 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

Ga-70 | 1 E−05 | 1 E−05 | - | 6 E + 05 | 4 E + 05 | - | ET/ET/

Ga-72 | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/ET/

Ga-73 | 4 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/St/

Ge-66 | 2 E−06 | 2 E−06 | - | 9 E + 04 | 9 E + 04 | - | ET/ET/

Ge-67 | 1 E−05 | 7 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Ge-68 | 6 E−07 | 7 E−08 | - | 2 E + 04 | 2 E + 03 | - | ET/St/

Ge-69 | 1 E−06 | 1 E−06 | - | 3 E + 04 | 3 E + 04 | - | ET/ET/

Ge-71 | 5 E−05 | 5 E−05 | - | 2 E + 06 | 1 E + 06 | - | ET/E/

Ge-75 | 1 E−05 | 7 E−06 | - | 4 E + 05 | 2 E + 05 | - | ET/ET/

Ge-77 | 1 E−06 | 1 E−06 | - | 4 E + 04 | 4 E + 04 | - | ET/ET/

Ge-78 | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

As-69 | - | 9 E−06 | - | - | 3 E + 05 | - | /ET/

As-70 | - | 2 E−06 | - | - | 8 E + 04 | - | /ET/

As-71 | - | 1 E−06 | - | - | 4 E + 04 | - | /St/

As-72 | - | 4 E−07 | - | - | 1 E + 04 | - | /St/

As-73 | - | 8 E−07 | - | - | 3 E + 04 | - | /St/

As-74 | - | 3 E−07 | - | - | 1 E + 04 | - | /St/

As-76 | - | 6 E−07 | - | - | 2 E + 04 | - | /St/

As-77 | - | 1 E−06 | - | - | 4 E + 04 | - | /St/

As-78 | - | 3 E−06 | - | - | 1 E + 05 | - | /ET/

Se-70 | 2 E−06 | 2 E−06 | - | 1 E + 05 | 9 E + 04 | - | ET/ET/

Se-73m | 1 E−05 | 1 E−05 | - | 5 E + 05 | 4 E + 05 | - | ET/ET/

Se-73 | 1 E−06 | 1 E−06 | - | 6 E + 04 | 5 E + 04 | - | ET/ET/

Se-75 | 4 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | St/St/

Se-79 | 3 E−07 | 1 E−07 | - | 1 E + 04 | 6 E + 03 | - | K/St/

Se-81m | 1 E−05 | 6 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Se-81 | 1 E−05 | 1 E−05 | - | 6 E + 05 | 4 E + 05 | - | ET/ET/

Se-83 | 6 E−06 | 5 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

Br-74m | 3 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Br-74 | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Br-75 | 4 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Br-76 | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/ET/

Br-77 | 2 E−06 | 2 E−06 | - | 7 E + 04 | 7 E + 04 | - | ET/ET/

Br-80m | 6 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/St/

Br-80 | 3 E−05 | 2 E−05 | - | 1 E + 06 | 7 E + 05 | - | ET/ET/

Br-82 | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/ET/

Br-83 | 9 E−06 | 6 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Br-84 | 7 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

Rb-79 | 8 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Rb-81m | 1 E−05 | - | - | 6 E + 05 | - | - | ET/ /

Rb-81 | 2 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Rb-82m | 8 E−07 | - | - | 3 E + 04 | - | - | ET/ /

Rb-83 | 5 E−07 | - | - | 2 E + 04 | - | - | St/ /

Rb-84 | 3 E−07 | - | - | 1 E + 04 | - | - | St/ /

Rb-86 | 4 E−07 | - | - | 1 E + 04 | - | - | St/ /

Rb-87 | 7 E−07 | - | - | 2 E + 04 | - | - | St/ /

Rb-88 | 1 E−05 | - | - | 5 E + 05 | - | - | ET/ /

Rb-89 | 1 E−05 | - | - | 3 E + 05 | - | - | ET/ /

Sr-80 | 3 E−06 | - | 2 E−06 | 1 E + 05 | - | 9 E + 04 | ET/ /St

Sr-81 | 7 E−06 | - | 5 E−06 | 2 E + 05 | - | 2 E + 05 | ET/ /ET

Sr-82 | 1 E−07 | - | 7 E−08 | 6 E + 03 | - | 2 E + 03 | St/ /St

Sr-83 | 1 E−06 | - | 9 E−07 | 3 E + 04 | - | 3 E + 04 | ET/ /ET

Sr-85m | 4 E−05 | - | 3 E−05 | 1 E + 06 | - | 1 E + 06 | ET/ /ET

Sr-85 | 1 E−06 | - | 8 E−07 | 3 E + 04 | - | 3 E + 04 | St/ /St

Sr-87m | 1 E−05 | - | 9 E−06 | 4 E + 05 | - | 3 E + 05 | ET/ /ET

Sr-89 | 4 E−07 | - | 1 E−07 | 1 E + 04 | - | 3 E + 03 | St/ /St

Sr-90 | 1 E−08 | - | 7 E−09 | 4 E + 02 | - | 2 E + 02 | BS/ /St

Sr-91 | 1 E−06 | - | 9 E−07 | 5 E + 04 | - | 3 E + 04 | ET/ /St

Sr-92 | 2 E−06 | - | 1 E−06 | 8 E + 04 | - | 6 E + 04 | ET/ /St

Y-86m | - | 7 E−06 | 6 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

Y-86 | - | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | /ET/ET

Y-87 | - | 9 E−07 | 8 E−07 | - | 3 E + 04 | 3 E + 04 | /ET/ET

Y-88 | - | 1 E−07 | 1 E−07 | - | 6 E + 03 | 6 E + 03 | /St/St

Y-90m | - | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | /St/St

Y-90 | - | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Y-91m | - | 2 E−05 | 2 E−05 | - | 7 E + 05 | 7 E + 05 | /ET/ET

Y-91 | - | 1 E−07 | 9 E−08 | - | 4 E + 03 | 3 E + 03 | /St/St

Y-92 | - | 2 E−06 | 2 E−06 | - | 7 E + 04 | 7 E + 04 | /St/St

Y-93 | - | 9 E−07 | 9 E−07 | - | 3 E + 04 | 3 E + 04 | /St/St

Y-94 | - | 8 E−06 | 8 E−06 | - | 3 E + 05 | 3 E + 05 | /ET/ET

Y-95 | - | 1 E−05 | 1 E−05 | - | 4 E + 05 | 4 E + 05 | /ET/ET

Zr-86 | 5 E−07 | 5 E−07 | 5 E−07 | 2 E + 04 | 2 E + 04 | 2 E + 04 | ET/ET/ET

Zr-88 | 1 E−07 | 3 E−07 | 3 E−07 | 5 E + 03 | 1 E + 04 | 1 E + 04 | St/St/St

Zr-89 | 6 E−07 | 6 E−07 | 6 E−07 | 2 E + 04 | 2 E + 04 | 2 E + 04 | ET/ET/ET

Zr-93 | 3 E−09 | 1 E−08 | 1 E−07 | 1 E + 02 | 6 E + 02 | 5 E + 03 | BS/BS/BS

Zr-95 | 9 E−08 | 1 E−07 | 1 E−07 | 3 E + 03 | 5 E + 03 | 4 E + 03 | BS/St/St

Zr-97 | 7 E−07 | 4 E−07 | 4 E−07 | 2 E + 04 | 1 E + 04 | 1 E + 04 | ET/St/St

Nb-88 | - | 5 E−06 | 5 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Nb-89 (66 min) | - | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Nb-89 (122 min) | - | 2 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Nb-90 | - | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | /ET/ET

Nb-93m | - | 1 E−06 | 6 E−07 | - | 7 E + 04 | 2 E + 04 | /St/St

Nb-94 | - | 7 E−08 | 2 E−08 | - | 2 E + 03 | 8 E + 02 | /St/St

Nb-95m | - | 7 E−07 | 6 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Nb-95 | - | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Nb-96 | - | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | /ET/ET

Nb-97 | - | 5 E−06 | 5 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Nb-98 | - | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Mo-90 | 8 E−07 | - | 7 E−07 | 3 E + 04 | - | 2 E + 04 | ET/ /ET

Mo-93m | 1 E−06 | - | 1 E−06 | 3 E + 04 | - | 3 E + 04 | ET/ /ET

Mo-93 | 2 E−07 | - | 4 E−07 | 7 E + 03 | - | 1 E + 04 | BS/ /St

Mo-99 | 1 E−06 | - | 5 E−07 | 5 E + 04 | - | 1 E + 04 | E/ /St

Mo-101 | 8 E−06 | - | 6 E−06 | 3 E + 05 | - | 2 E + 05 | ET/ /ET

Tc-93m | 8 E−06 | 7 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Tc-93 | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Tc-94m | 5 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Tc-94 | 1 E−06 | 1 E−06 | - | 4 E + 04 | 3 E + 04 | - | ET/ET/

Tc-95m | 8 E−07 | 6 E−07 | - | 3 E + 04 | 2 E + 04 | - | ET/St/

Tc-95 | 1 E−06 | 1 E−06 | - | 5 E + 04 | 5 E + 04 | - | ET/ET/

Tc-96m | 2 E−05 | 2 E−05 | - | 1 E + 06 | 1 E + 06 | - | ET/ET/

Tc-96 | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/ET/

Tc-97m | 1 E−06 | 2 E−07 | - | 5 E + 04 | 7 E + 03 | - | St/St/

Tc-97 | 4 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/St/

Tc-98 | 3 E−07 | 9 E−08 | - | 1 E + 04 | 3 E + 03 | - | St/St/

Tc-99m | 1 E−05 | 1 E−05 | - | 5 E + 05 | 4 E + 05 | - | ET/ET/

Tc-99 | 1 E−06 | 1 E−07 | - | 5 E + 04 | 6 E + 03 | - | St/St/

Tc-101 | 1 E−05 | 1 E−05 | - | 6 E + 05 | 4 E + 05 | - | ET/ET/

Tc-104 | 9 E−06 | 7 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Ru-94 | 5 E−06 | 5 E−06 | 5 E−06 | 2 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Ru-97 | 2 E−06 | 2 E−06 | 2 E−06 | 8 E + 04 | 8 E + 04 | 8 E + 04 | ET/ET/ET

Ru-103 | 8 E−07 | 2 E−07 | 2 E−07 | 3 E + 04 | 1 E + 04 | 9 E + 03 | St/St/St

Ru-105 | 2 E−06 | 2 E−06 | 2 E−06 | 9 E + 04 | 8 E + 04 | 8 E + 04 | ET/ET/ET

Ru-106 | 5 E−08 | 3 E−08 | 1 E−08 | 2 E + 03 | 1 E + 03 | 5 E + 02 | St/St/St

Rh-99m | 3 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Rh-99 | 8 E−07 | 6 E−07 | 6 E−07 | 3 E + 04 | 2 E + 04 | 2 E + 04 | ET/St/St

Rh-100 | 5 E−07 | 5 E−07 | 5 E−07 | 1 E + 04 | 1 E + 04 | 1 E + 04 | ET/ET/ET

Rh-101m | 1 E−06 | 1 E−06 | 1 E−06 | 6 E + 04 | 6 E + 04 | 6 E + 04 | ET/ET/ET

Rh-101 | 3 E−07 | 3 E−07 | 1 E−07 | 1 E + 04 | 1 E + 04 | 6 E + 03 | St/St/St

Rh-102m | 2 E−07 | 2 E−07 | 1 E−07 | 1 E + 04 | 7 E + 03 | 4 E + 03 | St/St/St

Rh-102 | 6 E−08 | 1 E−07 | 6 E−08 | 2 E + 03 | 4 E + 03 | 2 E + 03 | St/St/St

Rh-103m | 4 E−04 | 2 E−04 | 2 E−04 | 1 E + 07 | 8 E + 06 | 8 E + 06 | St/St/St

Rh-105 | 3 E−06 | 1 E−06 | 1 E−06 | 1 E + 05 | 5 E + 04 | 4 E + 04 | ET/St/St

Rh-106m | 1 E−06 | 1 E−06 | 1 E−06 | 6 E + 04 | 5 E + 04 | 5 E + 04 | ET/ET/ET

Rh-107 | 1 E−05 | 9 E−06 | 9 E−06 | 5 E + 05 | 3 E + 05 | 3 E + 05 | ET/ET/ET

Pd-100 | 5 E−07 | 5 E−07 | 5 E−07 | 2 E + 04 | 2 E + 04 | 2 E + 04 | ET/ET/ET

Pd-101 | 3 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Pd-103 | 4 E−06 | 1 E−06 | 1 E−06 | 1 E + 05 | 6 E + 04 | 7 E + 04 | E/St/St

Pd-107 | 1 E−05 | 1 E−05 | 1 E−06 | 5 E + 05 | 4 E + 05 | 7 E + 04 | K/St/St

Pd-109 | 2 E−06 | 1 E−06 | 1 E−06 | 9 E + 04 | 4 E + 04 | 4 E + 04 | St/St/St

Ag-102 | 9 E−06 | 7 E−06 | 7 E−06 | 3 E + 05 | 2 E + 05 | 2 E + 05 | ET/ET/ET

Ag-103 | 8 E−06 | 7 E−06 | 7 E−06 | 3 E + 05 | 2 E + 05 | 2 E + 05 | ET/ET/ET

Ag-104m | 8 E−06 | 6 E−06 | 6 E−06 | 2 E + 05 | 2 E + 05 | 2 E + 05 | ET/ET/ET

Ag-104 | 3 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Ag-105 | 7 E−07 | 8 E−07 | 7 E−07 | 2 E + 04 | 2 E + 04 | 2 E + 04 | St/St/St

Ag-106m | 2 E−07 | 2 E−07 | 2 E−07 | 9 E + 03 | 9 E + 03 | 9 E + 03 | ET/ET/ET

Ag-106 | 1 E−05 | 1 E−05 | 1 E−05 | 5 E + 05 | 4 E + 05 | 4 E + 05 | ET/ET/ET

Ag-108m | 7 E−08 | 1 E−07 | 2 E−08 | 2 E + 03 | 4 E + 03 | 1 E + 03 | St/St/St

Ag-110m | 8 E−08 | 9 E−08 | 7 E−08 | 3 E + 03 | 3 E + 03 | 2 E + 03 | St/St/St

Ag-111 | 9 E−07 | 3 E−07 | 3 E−07 | 3 E + 04 | 1 E + 04 | 1 E + 04 | St/St/St

Ag-112 | 4 E−06 | 2 E−06 | 2 E−06 | 1 E + 05 | 8 E + 04 | 8 E + 04 | E/St/St

Ag-115 | 1 E−05 | 8 E−06 | 8 E−06 | 4 E + 05 | 3 E + 05 | 3 E + 05 | ET/ET/ET

Cd-104 | 4 E−06 | 4 E−06 | 4 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Cd-107 | 5 E−06 | 5 E−06 | 4 E−06 | 2 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Cd-109 | 2 E−08 | 9 E−08 | 1 E−07 | 9 E + 02 | 3 E + 03 | 4 E + 03 | K/K/St

Cd-113m | 1 E−09 | 6 E−09 | 1 E−08 | 6 E + 01 | 2 E + 02 | 6 E + 02 | K/K/K

Cd-113 | 1 E−09 | 5 E−09 | 1 E−08 | 5 E + 01 | 2 E + 02 | 5 E + 02 | K/K/K

Cd-115m | 3 E−08 | 1 E−07 | 1 E−07 | 1 E + 03 | 3 E + 03 | 3 E + 03 | K/St/St

Cd-115 | 9 E−07 | 4 E−07 | 4 E−07 | 3 E + 04 | 1 E + 04 | 1 E + 04 | K/St/St

Cd-117m | 1 E−06 | 1 E−06 | 1 E−06 | 4 E + 04 | 4 E + 04 | 4 E + 04 | ET/ET/ET

Cd-117 | 2 E−06 | 2 E−06 | 2 E−06 | 8 E + 04 | 7 E + 04 | 7 E + 04 | ET/ET/ET

In-109 | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

In-110 (69 min) | 5 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

In-110 (5 h) | 9 E−07 | 9 E−07 | - | 3 E + 04 | 3 E + 04 | - | ET/ET/

In-111 | 1 E−06 | 1 E−06 | - | 5 E + 04 | 5 E + 04 | - | ET/ET/

In-112 | 2 E−05 | 1 E−05 | - | 9 E + 05 | 6 E + 05 | - | ET/ET/

In-113m | 1 E−05 | 1 E−05 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

In-114m | 5 E−08 | 9 E−08 | - | 1 E + 03 | 3 E + 03 | - | St/St/

In-115m | 6 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

In-115 | 1 E−09 | 5 E−09 | - | 4 E + 01 | 1 E + 02 | - | St/St/

In-116m | 4 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

In-117m | 5 E−06 | 4 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

In-117 | 7 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

In-119m | 1 E−05 | 1 E−05 | - | 6 E + 05 | 4 E + 05 | - | ET/ET/

Sn-110 | 1 E−06 | 1 E−06 | - | 6 E + 04 | 6 E + 04 | - | ET/ET/

Sn-111 | 1 E−05 | 1 E−05 | - | 6 E + 05 | 5 E + 05 | - | ET/ET/

Sn-113 | 7 E−07 | 2 E−07 | - | 2 E + 04 | 1 E + 04 | - | St/St/

Sn-117m | 8 E−07 | 2 E−07 | - | 3 E + 04 | 9 E + 03 | - | BS/St/

Sn-119m | 1 E−06 | 3 E−07 | - | 5 E + 04 | 1 E + 04 | - | St/St/

Sn-121m | 5 E−07 | 1 E−07 | - | 2 E + 04 | 6 E + 03 | - | St/St/

Sn-121 | 4 E−06 | 2 E−06 | - | 1 E + 05 | 7 E + 04 | - | ET/St/

Sn-123m | 1 E−05 | 7 E−06 | - | 4 E + 05 | 2 E + 05 | - | ET/ET/

Sn-123 | 3 E−07 | 1 E−07 | - | 1 E + 04 | 3 E + 03 | - | St/St/

Sn-125 | 4 E−07 | 2 E−07 | - | 1 E + 04 | 7 E + 03 | - | St/St/

Sn-126 | 4 E−08 | 3 E−08 | - | 1 E + 03 | 1 E + 03 | - | St/St/

Sn-127 | 2 E−06 | 2 E−06 | - | 9 E + 04 | 7 E + 04 | - | ET/ET/

Sn-128 | 2 E−06 | 2 E−06 | - | 1 E + 05 | 8 E + 04 | - | ET/ET/

Sb-115 | 1 E−05 | 1 E−05 | - | 5 E + 05 | 4 E + 05 | - | ET/ET/

Sb-116m | 3 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Sb-116 | 1 E−05 | 1 E−05 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

Sb-117 | 1 E−05 | 1 E−05 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

Sb-118m | 1 E−06 | 1 E−06 | - | 4 E + 04 | 4 E + 04 | - | ET/ET/

Sb-119 | 6 E−06 | 6 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

Sb-120 (16 min) | 2 E−05 | 2 E−05 | - | 1 E + 06 | 7 E + 05 | - | ET/ET/

Sb-120 (6 d) | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/ET/

Sb-122 | 8 E−07 | 4 E−07 | - | 3 E + 04 | 1 E + 04 | - | St/St/

Sb-124m | 4 E−05 | 3 E−05 | - | 1 E + 06 | 1 E + 06 | - | ET/ET/

Sb-124 | 2 E−07 | 1 E−07 | - | 1 E + 04 | 4 E + 03 | - | St/St/

Sb-125 | 2 E−07 | 1 E−07 | - | 7 E + 03 | 6 E + 03 | - | BS/St/

Sb-126m | 1 E−05 | 7 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Sb-126 | 2 E−07 | 1 E−07 | - | 9 E + 03 | 6 E + 03 | - | ET/St/

Sb-127 | 7 E−07 | 3 E−07 | - | 2 E + 04 | 1 E + 04 | - | E/St/

Sb-128 (9 h) | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/ET/

Sb-128 (10 min) | 1 E−05 | 9 E−06 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

Sb-129 | 1 E−06 | 1 E−06 | - | 6 E + 04 | 5 E + 04 | - | ET/ET/

Sb-130 | 3 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Sb-131 | 6 E−06 | 4 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

Te-116 (Vapor) | - | 6 E−06 | - | - | 2 E + 05 | - | /St /

Te-116 | 2 E−06 | 2 E−06 | - | 8 E + 04 | 7 E + 04 | - | ET/ET/

Te-121m (Vapor) | - | 4 E−08 | - | - | 1 E + 03 | - | /BS/

Te-121m | 1 E−07 | 1 E−07 | - | 4 E + 03 | 5 E + 03 | - | BS/St/

Te-121 (Vapor) | - | 1 E−06 | - | - | 4 E + 04 | - | /St /

Te-121 | 1 E−06 | 1 E−06 | - | 3 E + 04 | 3 E + 04 | - | ET/ET/

Te-123m (Vapor) | - | 5 E−08 | - | - | 2 E + 03 | - | /BS/

Te-123m | 1 E−07 | 1 E−07 | - | 4 E + 03 | 6 E + 03 | - | BS/St/

Te-123 (Vapor) | - | 1 E−08 | - | - | 4 E + 02 | - | /BS/

Te-123 | 2 E−08 | 5 E−08 | - | 1 E + 03 | 1 E + 03 | - | BS/BS/

Te-125m (Vapor) | - | 1 E−07 | - | - | 3 E + 03 | - | /BS/

Te-125m | 2 E−07 | 1 E−07 | - | 9 E + 03 | 7 E + 03 | - | BS/St/

Te-127m (Vapor) | - | 6 E−08 | - | - | 2 E + 03 | - | /BS/

Te-127m | 1 E−07 | 9 E−08 | - | 5 E + 03 | 3 E + 03 | - | BS/St/

Te-127 (Vapor) | - | 7 E−06 | - | - | 2 E + 05 | - | /St/

Te-127 | 5 E−06 | 3 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/St/

Te-129m (Vapor) | - | 1 E−07 | - | - | 5 E + 03 | - | /St/

Te-129m | 3 E−07 | 1 E−07 | - | 1 E + 04 | 3 E + 03 | - | St/St/

Te-129 (Vapor) | - | 1 E−05 | - | - | 5 E + 05 | - | /St/

Te-129 | 1 E−05 | 7 E−06 | - | 4 E + 05 | 2 E + 05 | - | ET/ET/

Te-131m (Vapor) | - | 1 E−07 | - | - | 5 E + 03 | - | /T/

Te-131m | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | T/St/

Te-131 (Vapor) | - | 6 E−06 | - | - | 2 E + 05 | - | /T/

Te-131 | 1 E−05 | 7 E−06 | - | 4 E + 05 | 2 E + 05 | - | ET/ET/

Te-132 (Vapor) | - | 7 E−08 | - | - | 2 E + 03 | - | /T/

Te-132 | 1 E−07 | 1 E−07 | - | 6 E + 03 | 6 E + 03 | - | T/St/

Te-133m (Vapor) | - | 1 E−06 | - | - | 6 E + 04 | - | /T/

Te-133m | 3 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | T/ET/

Te-133 (Vapor) | - | 7 E−06 | - | - | 2 E + 05 | - | /T/

Te-133 | 1 E−05 | 9 E−06 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

Te-134 (Vapor) | - | 6 E−06 | - | - | 2 E + 05 | - | /St/

Te-134 | 3 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

I-120m (Methyl) | 4 E−06 | - | - | 1 E + 05 | - | - | T/ /

I-120m (Vapor) | - | 3 E−06 | - | - | 1 E + 05 | - | /St /

I-120m | 2 E−06 | - | - | 8 E + 04 | - | - | ET/ /

I-120 (Methyl) | 1 E−06 | - | - | 6 E + 04 | - | - | T/ /

I-120 (Vapor) | - | 1 E−06 | - | - | 5 E + 04 | - | /T/

I-120 | 2 E−06 | - | - | 1 E + 05 | - | - | E/ /

I-121 (Methyl) | 5 E−06 | - | - | 2 E + 05 | - | - | T/ /

I-121 (Vapor) | - | 4 E−06 | - | - | 1 E + 05 | - | /T/

I-121 | 8 E−06 | - | - | 3 E + 05 | - | - | T/ /

I-123 (Methyl) | 1 E−06 | - | - | 7 E + 04 | - | - | T/ /

I-123 (Vapor) | - | 1 E−06 | - | - | 5 E + 04 | - | /T/

I-123 | 2 E−06 | - | - | 1 E + 05 | - | - | T/ /

I-124 (Methyl) | 3 E−08 | - | - | 1 E + 03 | - | - | T/ /

I-124 (Vapor) | - | 2 E−08 | - | - | 9 E + 02 | - | /T/

I-124 | 4 E−08 | - | - | 1 E + 03 | - | - | T/ /

I-125 (Methyl) | 2 E−08 | - | - | 9 E + 02 | - | - | T/ /

I-125 (Vapor) | - | 2 E−08 | - | - | 7 E + 02 | - | /T/

I-125 | 3 E−08 | - | - | 1 E + 03 | - | - | T/ /

I-126 (Methyl) | 1 E−08 | - | - | 5 E + 02 | - | - | T/ /

I-126 (Vapor) | - | 1 E−08 | - | - | 4 E + 02 | - | /T/

I-126 | 2 E−08 | - | - | 7 E + 02 | - | - | T/ /

I-128 (Methyl) | 3 E−05 | - | - | 1 E + 06 | - | - | T/ /

I-128 (Vapor) | - | 8 E−06 | - | - | 3 E + 05 | - | /St/

I-128 | 1 E−05 | - | - | 6 E + 05 | - | - | ET/ /

I-129 (Methyl) | 3 E−09 | - | - | 1 E + 02 | - | - | T/ /

I-129 (Vapor) | - | 2 E−09 | - | - | 1 E + 02 | - | /T/

I-129 | 5 E−09 | - | - | 2 E + 02 | - | - | T/ /

I-130 (Methyl) | 2 E−07 | - | - | 7 E + 03 | - | - | T/ /

I-130 (Vapor) | - | 1 E−07 | - | - | 6 E + 03 | - | /T/

I-130 | 3 E−07 | - | - | 1 E + 04 | - | - | T/ /

I-131 (Methyl) | 1 E−08 | - | - | 6 E + 02 | - | - | T/ /

I-131 (Vapor) | - | 1 E−08 | - | - | 5 E + 02 | - | /T/

I-131 | 2 E−08 | - | - | 9 E + 02 | - | - | T/ /

I-132m (Methyl) | 1 E−06 | - | - | 7 E + 04 | - | - | T/ /

I-132m (Vapor) | - | 1 E−06 | - | - | 6 E + 04 | - | /T/

I-132m | 3 E−06 | - | - | 1 E + 05 | - | - | T/ /

I-132 (Methyl) | 1 E−06 | - | - | 6 E + 04 | - | - | T/ /

I-132 (Vapor) | - | 1 E−06 | - | - | 5 E + 04 | - | /T/

I-132 | 2 E−06 | - | - | 7 E + 04 | - | - | T/ /

I-133 (Methyl) | 9 E−08 | - | - | 3 E + 03 | - | - | T/ /

I-133 (Vapor) | - | 7 E−08 | - | - | 2 E + 03 | - | /T/

I-133 | 1 E−07 | - | - | 5 E + 03 | - | - | T/ /

I-134 (Methyl) | 8 E−06 | - | - | 2 E + 05 | - | - | T/ /

I-134 (Vapor) | - | 3 E−06 | - | - | 1 E + 05 | - | /St/

I-134 | 3 E−06 | - | - | 1 E + 05 | - | - | ET/ /

I-135 (Methyl) | 4 E−07 | - | - | 1 E + 04 | - | - | T/ /

I-135 (Vapor) | - | 3 E−07 | - | - | 1 E + 04 | - | /T/

I-135 | 6 E−07 | - | - | 2 E + 04 | - | - | T/ /

Cs-125 | 1 E−05 | - | - | 4 E + 05 | - | - | ET/ /

Cs-127 | 4 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Cs-129 | 2 E−06 | - | - | 9 E + 04 | - | - | ET/ /

Cs-130 | 1 E−05 | - | - | 6 E + 05 | - | - | ET/ /

Cs-131 | 7 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Cs-132 | 9 E−07 | - | - | 3 E + 04 | - | - | ET/ /

Cs-134m | 8 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Cs-134 | 5 E−08 | - | - | 2 E + 03 | - | - | St/ /

Cs-135m | 8 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Cs-135 | 5 E−07 | - | - | 2 E + 04 | - | - | St/ /

Cs-136 | 2 E−07 | - | - | 1 E + 04 | - | - | E/ /

Cs-137 | 8 E−08 | - | - | 3 E + 03 | - | - | St/ /

Cs-138 | 5 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Ba-126 | 4 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Ba-128 | 4 E−07 | - | - | 1 E + 04 | - | - | St/ /

Ba-131m | 4 E−05 | - | - | 1 E + 06 | - | - | ET/ /

Ba-131 | 1 E−06 | - | - | 4 E + 04 | - | - | ET/ /

Ba-133m | 2 E−06 | - | - | 7 E + 04 | - | - | St/ /

Ba-133 | 3 E−07 | - | - | 1 E + 04 | - | - | St/ /

Ba-135m | 2 E−06 | - | - | 9 E + 04 | - | - | St/ /

Ba-139 | 1 E−05 | - | - | 3 E + 05 | - | - | St/ /

Ba-140 | 3 E−07 | - | - | 1 E + 04 | - | - | St/ /

Ba-141 | 1 E−05 | - | - | 4 E + 05 | - | - | ET/ /

Ba-142 | 9 E−06 | - | - | 3 E + 05 | - | - | ET/ /

La-131 | 1 E−05 | 8 E−06 | - | 4 E + 05 | 3 E + 05 | - | ET/ET/

La-132 | 1 E−06 | 1 E−06 | - | 5 E + 04 | 5 E + 04 | - | ET/ET/

La-135 | 1 E−05 | 1 E−05 | - | 4 E + 05 | 4 E + 05 | - | ET/ET/

La-137 | 4 E−08 | 2 E−07 | - | 1 E + 03 | 8 E + 03 | - | L/L/

La-138 | 3 E−09 | 1 E−08 | - | 1 E + 02 | 4 E + 02 | - | St/St/

La-140 | 4 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/St/

La-141 | 5 E−06 | 2 E−06 | - | 1 E + 05 | 9 E + 04 | - | St/St/

La-142 | 2 E−06 | 2 E−06 | - | 9 E + 04 | 8 E + 04 | - | ET/ET/

La-143 | 1 E−05 | 1 E−05 | - | 6 E + 05 | 4 E + 05 | - | ET/ET/

Ce-134 | - | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Ce-135 | - | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | /ET/ET

Ce-137m | - | 1 E−06 | 9 E−07 | - | 3 E + 04 | 3 E + 04 | /St/St

Ce-137 | - | 1 E−05 | 1 E−05 | - | 7 E + 05 | 7 E + 05 | /ET/ET

Ce-139 | - | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Ce-141 | - | 2 E−07 | 1 E−07 | - | 7 E + 03 | 6 E + 03 | /St/St

Ce-143 | - | 5 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Ce-144 | - | 2 E−08 | 1 E−08 | - | 9 E + 02 | 7 E + 02 | /St/St

Pr-136 | - | 1 E−05 | 1 E−05 | - | 3 E + 05 | 3 E + 05 | /ET/ET

Pr-137 | - | 9 E−06 | 9 E−06 | - | 3 E + 05 | 3 E + 05 | /ET/ET

Pr-138m | - | 2 E−06 | 2 E−06 | - | 7 E + 04 | 7 E + 04 | /ET/ET

Pr-139 | - | 1 E−05 | 1 E−05 | - | 5 E + 05 | 5 E + 05 | /ET/ET

Pr-142m | - | 6 E−05 | 5 E−05 | - | 2 E + 06 | 2 E + 06 | /St/St

Pr-142 | - | 8 E−07 | 7 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Pr-143 | - | 2 E−07 | 2 E−07 | - | 1 E + 04 | 9 E + 03 | /St/St

Pr-144 | - | 1 E−05 | 1 E−05 | - | 4 E + 05 | 4 E + 05 | /ET/ET

Pr-145 | - | 2 E−06 | 2 E−06 | - | 8 E + 04 | 8 E + 04 | /St/St

Pr-147 | - | 9 E−06 | 9 E−06 | - | 3 E + 05 | 3 E + 05 | /ET/ET

Nd-136 | - | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Nd-138 | - | 1 E−06 | 1 E−06 | - | 5 E + 04 | 5 E + 04 | /St/St

Nd-139m | - | 1 E−06 | 1 E−06 | - | 5 E + 04 | 5 E + 04 | /ET/ET

Nd-139 | - | 1 E−05 | 1 E−05 | - | 6 E + 05 | 6 E + 05 | /ET/ET

Nd-141 | - | 3 E−05 | 3 E−05 | - | 1 E + 06 | 1 E + 06 | /ET/ET

Nd-147 | - | 2 E−07 | 2 E−07 | - | 1 E + 04 | 9 E + 03 | /St/St

Nd-149 | - | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Nd-151 | - | 9 E−06 | 9 E−06 | - | 3 E + 05 | 3 E + 05 | /ET/ET

Pm-141 | - | 1 E−05 | 1 E−05 | - | 4 E + 05 | 4 E + 05 | /ET/ET

Pm-143 | - | 5 E−07 | 6 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Pm-144 | - | 1 E−07 | 1 E−07 | - | 3 E + 03 | 5 E + 03 | /St/St

Pm-145 | - | 1 E−07 | 4 E−07 | - | 5 E + 03 | 1 E + 04 | /BS/St

Pm-146 | - | 4 E−08 | 6 E−08 | - | 1 E + 03 | 2 E + 03 | /St/St

Pm-147 | - | 1 E−07 | 1 E−07 | - | 4 E + 03 | 6 E + 03 | /BS/St

Pm-148m | - | 1 E−07 | 1 E−07 | - | 5 E + 03 | 4 E + 03 | /St/St

Pm-148 | - | 2 E−07 | 2 E−07 | - | 9 E + 03 | 9 E + 03 | /St/St

Pm-149 | - | 7 E−07 | 6 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Pm-150 | - | 2 E−06 | 2 E−06 | - | 8 E + 04 | 8 E + 04 | /ET/ET

Pm-151 | - | 9 E−07 | 8 E−07 | - | 3 E + 04 | 3 E + 04 | /St/St

Sm-141m | - | 5 E−06 | - | - | 2 E + 05 | - | /ET/

Sm-141 | - | 1 E−05 | - | - | 4 E + 05 | - | /ET/

Sm-142 | - | 4 E−06 | - | - | 1 E + 05 | - | /ET/

Sm-145 | - | 4 E−07 | - | - | 1 E + 04 | - | /BS/

Sm-146 | - | 2 E−11 | - | - | 1 E + 00 | - | /BS/

Sm-147 | - | 2 E−11 | - | - | 1 E + 00 | - | /BS/

Sm-151 | - | 7 E−08 | - | - | 2 E + 03 | - | /BS/

Sm-153 | - | 8 E−07 | - | - | 3 E + 04 | - | /St/

Sm-155 | - | 1 E−05 | - | - | 3 E + 05 | - | /ET/

Sm-156 | - | 2 E−06 | - | - | 7 E + 04 | - | /St/

Eu-145 | - | 5 E−07 | - | - | 2 E + 04 | - | /ET/

Eu-146 | - | 3 E−07 | - | - | 1 E + 04 | - | /ET/

Eu-147 | - | 5 E−07 | - | - | 2 E + 04 | - | /St/

Eu-148 | - | 2 E−07 | - | - | 9 E + 03 | - | /St/

Eu-149 | - | 2 E−06 | - | - | 9 E + 04 | - | /St/

Eu-150 (12 h) | - | 2 E−06 | - | - | 7 E + 04 | - | /St/

Eu-150 (34 yr) | - | 1 E−08 | - | - | 6 E + 02 | - | /St/

Eu-152m | - | 1 E−06 | - | - | 6 E + 04 | - | /St/

Eu-152 | - | 2 E−08 | - | - | 7 E + 02 | - | /St/

Eu-154 | - | 1 E−08 | - | - | 5 E + 02 | - | /St/

Eu-155 | - | 7 E−08 | - | - | 2 E + 03 | - | /BS/

Eu-156 | - | 1 E−07 | - | - | 6 E + 03 | - | /St/

Eu-157 | - | 1 E−06 | - | - | 4 E + 04 | - | /St/

Eu-158 | - | 5 E−6 | - | - | 1 E + 05 | - | /ET/

Gd-145 | 9 E−06 | 7 E−06 | - | 3 E + 05 | 2 E + 05 | - | ET/ET/

Gd-146 | 1 E−07 | 1 E−07 | - | 4 E + 03 | 4 E + 03 | - | St/St/

Gd-147 | 7 E−07 | 6 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/ET/

Gd-148 | 5 E−12 | 2 E−11 | - | 2 E−01 | 9 E−01 | - | BS/BS/

Gd-149 | 1 E−06 | 7 E−07 | - | 4 E + 04 | 2 E + 04 | - | St/St/

Gd-151 | 2 E−07 | 8 E−07 | - | 9 E + 03 | 3 E + 04 | - | BS/St/

Gd-152 | 7 E−12 | 3 E−11 | - | 2 E−01 | 1 E + 00 | - | BS/BS/

Gd-153 | 9 E−08 | 4 E−07 | - | 3 E + 03 | 1 E + 04 | - | BS/St/

Gd-159 | 3 E−06 | 1 E−06 | - | 1 E + 05 | 5 E + 04 | - | St/St/

Tb-147 | - | 2 E−06 | - | - | 1 E + 05 | - | /ET/

Tb-149 | - | 1 E−07 | - | - | 6 E + 03 | - | /St/

Tb-150 | - | 2 E−06 | - | - | 8 E + 04 | - | /ET/

Tb-151 | - | 1 E−06 | - | - | 4 E + 04 | - | /ET/

Tb-153 | - | 2 E−06 | - | - | 8 E + 04 | - | /St/

Tb-154 | - | 5 E−07 | - | - | 2 E + 04 | - | /ET/

Tb-155 | - | 2 E−06 | - | - | 8 E + 04 | - | /St/

Tb-156m (24 h) | - | 2 E−06 | - | - | 9 E + 04 | - | /St/

Tb-156m (5 h) | - | 4 E−06 | - | - | 1 E + 05 | - | /St/

Tb-156 | - | 4 E−07 | - | - | 1 E + 04 | - | /E/

Tb-157 | - | 2 E−07 | - | - | 8 E + 03 | - | /BS/

Tb-158 | - | 1 E−08 | - | - | 6 E + 02 | - | /BS/

Tb-160 | - | 1 E−07 | - | - | 3 E + 03 | - | /St/

Tb-161 | - | 4 E−07 | - | - | 1 E + 04 | - | /St/

Dy-155 | - | 2 E−06 | - | - | 1 E + 05 | - | /ET/

Dy-157 | - | 5 E−06 | - | - | 1 E + 05 | - | /ET/

Dy-159 | - | 2 E−06 | - | - | 8 E + 04 | - | /BS/

Dy-165 | - | 6 E−06 | - | - | 2 E + 05 | - | /ET/

Dy-166 | - | 3 E−07 | - | - | 1 E + 04 | - | /St/

Ho-155 | - | 1 E−05 | - | - | 4 E + 05 | - | /ET/

Ho-157 | - | 2 E−05 | - | - | 1 E + 06 | - | /ET/

Ho-159 | - | 2 E−05 | - | - | 9 E + 05 | - | /ET/

Ho-161 | - | 3 E−05 | - | - | 1 E + 06 | - | /ET/

Ho-162m | - | 9 E−06 | - | - | 3 E + 05 | - | /ET/

Ho-162 | - | 5 E−05 | - | - | 2 E + 06 | - | /ET/

Ho-164m | - | 3 E−05 | - | - | 1 E + 06 | - | /St/

Ho-164 | - | 2 E−05 | - | - | 8 E + 05 | - | /ET/

Ho-166m | - | 7 E−09 | - | - | 2 E + 02 | - | /St/

Ho-166 | - | 6 E−07 | - | - | 2 E + 04 | - | /St/

Ho-167 | - | 4 E−06 | - | - | 1 E + 05 | - | /ET/

Er-161 | - | 3 E−06 | - | - | 1 E + 05 | - | /ET/

Er-165 | - | 2 E−05 | - | - | 1 E + 06 | - | /ET/

Er-169 | - | 6 E−07 | - | - | 2 E + 04 | - | /St/

Er-171 | - | 1 E−06 | - | - | 6 E + 04 | - | /St/

Er-172 | - | 4 E−07 | - | - | 1 E + 04 | - | /St/

Tm-162 | - | 9 E−06 | - | - | 3E + 05 | - | /ET/

Tm-166 | - | 1 E−06 | - | - | 4 E + 04 | - | /ET/

Tm-167 | - | 5 E−07 | - | - | 2 E + 04 | - | /St/

Tm-170 | - | 1 E−07 | - | - | 4 E + 03 | - | /St/

Tm-171 | - | 2 E−07 | - | - | 9 E + 03 | - | /BS/

Tm-172 | - | 4 E−07 | - | - | 1 E + 04 | - | /St/

Tm-173 | - | 2 E−06 | - | - | 8 E + 04 | - | /St/

Tm-175 | - | 8 E−06 | - | - | 2 E + 05 | - | /ET/

Yb-162 | - | 1 E−05 | 1 E−05 | - | 5 E + 05 | 5 E + 05 | /ET/ET

Yb-166 | - | 6 E−07 | 5 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Yb-167 | - | 3 E−05 | 3 E−05 | - | 1 E + 06 | 1 E + 06 | /ET/ET

Yb-169 | - | 2 E−07 | 2 E−07 | - | 9 E + 03 | 8 E + 03 | /St/St

Yb-175 | - | 8 E−07 | 8 E−07 | - | 3 E + 04 | 2 E + 04 | /St/St

Yb-177 | - | 6 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

Yb-178 | - | 5 E−06 | 5 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/E

Lu-169 | - | 9 E−07 | 9 E−07 | - | 3 E + 04 | 3 E + 04 | /ET/ET

Lu-170 | - | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | /ET/ET

Lu-171 | - | 6 E−07 | 6 E−07 | - | 2 E + 04 | 2 E + 04 | /St/St

Lu-172 | - | 3 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Lu-173 | - | 2 E−07 | 4 E−07 | - | 8 E + 03 | 1 E + 04 | /BS/St

Lu-174m | - | 2 E−07 | 2 E−07 | - | 7 E + 03 | 8 E + 03 | /BS/St

Lu-174 | - | 9 E−08 | 2 E−07 | - | 3 E + 03 | 8 E + 03 | /BS/St

Lu-176m | - | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | /St/St

Lu-176 | - | 3 E−09 | 1 E−08 | - | 1 E + 02 | 6 E + 02 | /BS/St

Lu-177m | - | 5 E−08 | 4 E−08 | - | 2 E + 03 | 1 E + 03 | /St/St

Lu-177 | - | 5 E−07 | 5 E−07 | - | 2 E + 04 | 1 E + 04 | /St/St

Lu-178m | - | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Lu-178 | - | 8 E−06 | 8 E−06 | - | 3 E + 05 | 3 E + 05 | /ET/ET

Lu-179 | - | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | /St/St

Hf-170 | 1 E−06 | 1 E−06 | - | 4 E + 04 | 4 E + 04 | - | ET/ET/

Hf-172 | 6 E−09 | 3 E−08 | - | 2 E + 02 | 1 E + 03 | - | BS/BS/

Hf-173 | 2 E−06 | 2 E−06 | - | 9 E + 04 | 8 E + 04 | - | ET/ET/

Hf-175 | 5 E−07 | 6 E−07 | - | 2 E + 04 | 2 E + 04 | - | BS/St/

Hf-177m | 2 E−06 | 1 E−06 | - | 9 E + 04 | 6 E + 04 | - | ET/ET/

Hf-178m | 8 E−10 | 4 E−09 | - | 3 E + 01 | 1 E + 02 | - | BS/BS/

Hf-179m | 2 E−07 | 1 E−07 | - | 8 E + 03 | 6 E + 03 | - | BS/St/

Hf-180m | 2 E−06 | 1 E−06 | - | 7 E + 04 | 6 E + 04 | - | ET/ET/

Hf-181 | 1 E−07 | 1 E−07 | - | 4 E + 03 | 5 E + 03 | - | BS/St/

Hf-182m | 5 E−06 | 4 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

Hf-182 | 5 E−10 | 2 E−09 | - | 2 E + 01 | 9 E + 01 | - | BS/BS/

Hf-183 | 6 E−06 | 4 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

Hf-184 | 1 E−06 | 1 E−06 | - | 5 E + 04 | 4 E + 04 | - | ET/St/

Ta-172 | - | 5 E−06 | 5 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Ta-173 | - | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | /E/E

Ta-174 | - | 5 E−06 | 5 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

Ta-175 | - | 1 E−06 | 1 E−06 | - | 6 E + 04 | 6 E + 04 | /ET/ET

Ta-176 | - | 1 E−06 | 1 E−06 | - | 3 E + 04 | 3 E + 04 | /ET/ET

Ta-177 | - | 4 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | /St/St

Ta-178 | - | 3 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | /ET/ET

Ta-179 | - | 4 E−06 | 1 E−06 | - | 1 E + 05 | 7 E + 04 | /St/St

Ta-180m | - | 9 E−06 | 9 E−06 | - | 3 E + 05 | 3 E + 05 | /St/St

Ta-180 | - | 1 E−07 | 4 E−08 | - | 4 E + 03 | 1 E + 03 | /St/St

Ta-182m | - | 6 E−06 | 6 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

Ta-182 | - | 9 E−08 | 7 E−08 | - | 3 E + 03 | 2 E + 03 | /St/St

Ta-183 | - | 3 E−07 | 2 E−07 | - | 1 E + 04 | 1 E + 04 | /St/St

Ta-184 | - | 8 E−07 | 8 E−07 | - | 3 E + 04 | 3 E + 04 | /ET/ET

Ta-185 | - | 5 E−06 | 5 E−06 | - | 2 E + 05 | 1 E + 05 | /ET/ET

Ta-186 | - | 7 E−06 | 7 E−06 | - | 2 E + 05 | 2 E + 05 | /ET/ET

W-176 | 3 E−06 | - | - | 1 E + 05 | - | - | ET/ /

W-177 | 5 E−06 | - | - | 2 E + 05 | - | - | ET/ /

W-178 | 3 E−06 | - | - | 1 E + 05 | - | - | ET/ /

W-179 | 1 E−04 | - | - | 5 E + 06 | - | - | ET/ /

W-181 | 1 E−05 | - | - | 4 E + 05 | - | - | ET/ /

W-185 | 2 E−06 | - | - | 9 E + 04 | - | - | St/ /

W-187 | 1 E−06 | - | - | 5 E + 04 | - | - | ET/ /

W-188 | 6 E−07 | - | - | 2 E + 04 | - | - | St/ /

Re-177 | 1 E−05 | 1 E−05 | - | 6 E + 05 | 4 E + 05 | - | ET/ET/

Re-178 | 1 E−05 | 1 E−05 | - | 5 E + 05 | 3 E + 05 | - | ET/ET/

Re-181 | 1 E−06 | 1 E−06 | - | 5 E + 04 | 4 E + 04 | - | ET/ET/

Re-182 (64 h) | 4 E−07 | 3 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/St/

Re-182 (12 h) | 1 E−06 | 1 E−06 | - | 4 E + 04 | 4 E + 04 | - | ET/ET/

Re-184m | 6 E−07 | 1 E−07 | - | 2 E + 04 | 4 E + 03 | - | St/St/

Re-184 | 7 E−07 | 3 E−07 | - | 2 E + 04 | 1 E + 04 | - | ET/St/

Re-186m | 4 E−7 | 7 E−08 | - | 1 E + 04 | 2 E + 03 | - | St/St/

Re-186 | 7 E−07 | 4 E−07 | - | 2 E + 04 | 1 E + 04 | - | St/St/

Re-187 | 2 E−04 | 1 E−04 | - | 8 E + 06 | 4 E + 06 | - | St/St/

Re-188m | 3 E−05 | 2 E−05 | - | 1 E + 06 | 1 E + 06 | - | St/St/

Re-188 | 8 E−07 | 7 E−07 | - | 3 E + 04 | 2 E + 04 | - | St/St/

Re-189 | 1 E−06 | 9 E−07 | - | 4 E + 04 | 3 E + 04 | - | St/St/

Os-180 | 1 E−05 | 1 E−05 | 1 E−05 | 5 E + 05 | 3 E + 05 | 3 E + 05 | ET/ET/ET

Os-181 | 3 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Os-182 | 1 E−06 | 9 E−07 | 9 E−07 | 3 E + 04 | 3 E + 04 | 3 E + 04 | ET/ET/ET

Os-185 | 4 E−07 | 5 E−07 | 5 E−07 | 1 E + 04 | 2 E + 04 | 1 E + 04 | St/St/St

Os-189m | 1 E−04 | 7 E−05 | 7 E−05 | 4 E + 06 | 2 E + 06 | 2 E + 06 | St/St/St

Os-191m | 1 E−05 | 4 E−06 | 4 E−06 | 5 E + 05 | 1 E + 05 | 1 E + 05 | St/St/St

Os-191 | 1 E−06 | 4 E−07 | 3 E−07 | 5 E + 04 | 1 E + 04 | 1 E + 04 | St/St/St

Os-193 | 2 E−06 | 8 E−07 | 8 E−07 | 7 E + 04 | 3 E + 04 | 3 E + 04 | St/St/St

Os-194 | 4 E−08 | 4 E−08 | 1 E−08 | 1 E + 03 | 1 E + 03 | 4 E + 02 | St/St/St

Ir-182 | 9 E−06 | 7 E−06 | 7 E−06 | 3 E + 05 | 2 E + 05 | 2 E + 05 | ET/ET/ET

Ir-184 | 1 E−06 | 1 E−06 | 1 E−06 | 7 E + 04 | 6 E + 04 | 7 E + 04 | ET/ET/ET

Ir-185 | 2 E−06 | 1 E−06 | 1 E−06 | 7 E + 04 | 7 E + 04 | 7 E + 04 | ET/ET/ET

Ir-186 (16 h) | 8 E−07 | 7 E−07 | 7 E−07 | 2 E + 04 | 2 E + 04 | 2 E + 04 | ET/ET/ET

Ir-186 (2 h) | 5 E−06 | 4 E−06 | 4 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Ir-187 | 4 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Ir-188 | 6 E−07 | 6 E−07 | 6 E−07 | 2 E + 04 | 2 E + 04 | 2 E + 04 | ET/ET/ET

Ir-189 | 3 E−06 | 1 E−06 | 1 E−06 | 1 E + 05 | 5 E + 04 | 4 E + 04 | St/St/St

Ir-190m (3 h) | 2 E−06 | 2 E−06 | 2 E−06 | 8 E + 04 | 8 E + 04 | 7 E + 04 | ET/ET/ET

Ir-190m (1 h) | 9 E−05 | 5 E−05 | 5 E−05 | 3 E + 06 | 2 E + 06 | 1 E + 06 | ET/St/St

Ir-190 | 4 E−07 | 2 E−07 | 2 E−07 | 1 E + 04 | 9 E + 03 | 8 E + 03 | ET/St/St

Ir-192m | 1 E−07 | 1 E−07 | 2 E−08 | 3 E + 03 | 6 E + 03 | 1 E + 03 | St/St/St

Ir-192 | 2 E−07 | 1 E−07 | 1 E−07 | 9 E + 03 | 5 E + 03 | 4 E + 03 | St/St/St

Ir-194m | 8 E−08 | 8 E−08 | 6 E−08 | 3 E + 03 | 3 E + 03 | 2 E + 03 | St/St/St

Ir-194 | 1 E−06 | 7 E−07 | 7 E−07 | 5 E + 04 | 2 E + 04 | 2 E + 04 | St/St/St

Ir-195m | 2 E−06 | 2 E−06 | 2 E−06 | 9 E + 04 | 7 E + 04 | 7 E + 04 | ET/ET/ET

Ir-195 | 7 E−06 | 5 E−06 | 4 E−06 | 2 E + 05 | 1 E + 05 | 1 E + 05 | ET/ET/ET

Pt-186 | 3 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Pt-188 | 8 E−07 | - | - | 3 E + 04 | - | - | E/ /

Pt-189 | 3 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Pt-191 | 1 E−06 | - | - | 7 E + 04 | - | - | ET/ /

Pt-193m | 2 E−06 | - | - | 8 E + 04 | - | - | ET/ /

Pt-193 | 2 E−05 | - | - | 7 E + 05 | - | - | ET/ /

Pt-195m | 1 E−06 | - | - | 5 E + 04 | - | - | ET/ /

Pt-197m | 7 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Pt-197 | 3 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Pt-199 | 1 E−05 | - | - | 4 E + 05 | - | - | ET/ /

Pt-200 | 1 E−06 | - | - | 5 E + 04 | - | - | St/ /

Au-193 | 4 E−06 | 3 E−06 | 3 E−06 | 1 E + 05 | 1 E + 05 | 1 E + 05 | ET/E/St

Au-194 | 9 E−07 | 9 E−07 | 9 E−07 | 3 E + 04 | 3 E + 04 | 3 E + 04 | ET/ET/ET

Au-195 | 3 E−06 | 7 E−07 | 4 E−07 | 1 E + 05 | 2 E + 04 | 1 E + 04 | ET/St/St

Au-198m | 6 E−07 | 2 E−07 | 2 E−07 | 2 E + 04 | 1 E + 04 | 1 E + 04 | ET/St/St

Au-198 | 1 E−06 | 5 E−07 | 5 E−07 | 4 E + 04 | 2 E + 04 | 1 E + 04 | ET/St/St

Au-199 | 2 E−06 | 8 E−07 | 7 E−07 | 7 E + 04 | 3 E + 04 | 2 E + 04 | ET/St/St

Au-200m | 5 E−07 | 4 E−07 | 4 E−07 | 1 E + 04 | 1 E + 04 | 1 E + 04 | ET/ET/ET

Au-200 | 1 E−05 | 7 E−06 | 7 E−06 | 4 E + 05 | 2 E + 05 | 2 E + 05 | ET/ET/ET

Au-201 | 1 E−05 | 1 E−05 | 9 E−06 | 5 E + 05 | 3 E + 05 | 3 E + 05 | ET/ET/ET

Hg-193m (Org) | 1 E−06 | - | - | 4 E + 04 | - | - | ET/ /

Hg-193m | 1 E−06 | 1 E−06 | - | 4 E + 04 | 4 E + 04 | - | ET/ET/

Hg-193m (Vapor) | - | 1 E−07 | - | - | 6 E + 03 | - | /St/

Hg-193 (Org) | 5 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Hg-193 | 5 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Hg-193 (Vapor) | - | 5 E−07 | - | - | 1 E + 04 | - | /St/

Hg-194 (Org) | 2 E−08 | - | - | 1 E + 03 | - | - | St/ /

Hg-194 | 3 E−08 | 1 E−07 | - | 1 E + 03 | 3 E + 03 | - | St/St/

Hg-194 (Vapor) | - | 1 E−08 | - | - | 5 E + 02 | - | /St/

Hg-195m (Org) | 1 E−06 | - | - | 5 E + 04 | - | - | ET/ /

Hg-195m | 1 E−06 | 8 E−07 | - | 5 E + 04 | 3 E + 04 | - | ET/St/

Hg-195m (Vapor) | - | 6 E−08 | - | - | 2 E + 03 | - | /St/

Hg-195 (Org) | 6 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Hg-195 | 6 E−06 | 6 E−06 | - | 2 E + 05 | 2 E + 05 | - | ET/ET/

Hg-195 (Vapor) | - | 4 E−07 | - | - | 1 E + 04 | - | /St/

Hg-197m (Org) | 1 E−06 | - | - | 5 E + 04 | - | - | ET/ /

Hg-197m | 1 E−06 | 8 E−07 | - | 5 E + 04 | 3 E + 04 | - | ET/St/

Hg-197m (Vapor) | - | 9 E−08 | - | - | 3 E + 03 | - | /St/

Hg-197 (Org) | 4 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Hg-197 | 4 E−06 | 2 E−06 | - | 1 E + 05 | 7 E + 04 | - | ET/St/

Hg-197 (Vapor) | - | 1 E−07 | - | - | 4 E + 03 | - | /St/

Hg-199m (Org) | 8 E−06 | - | - | 3 E + 05 | - | - | ET/ /

Hg-199m | 8 E−06 | 5 E−06 | - | 3 E + 05 | 1 E + 05 | - | ET/ET/

Hg-199m (Vapor) | - | 3 E−06 | - | - | 1 E + 05 | - | /St/

Hg-203 (Org) | 7 E−07 | - | - | 2 E + 04 | - | - | St/ /

Hg-203 | 9 E−07 | 2 E−07 | - | 3 E + 04 | 1 E + 04 | - | St/St/

Hg-203 (Vapor) | - | 8 E−08 | - | - | 2 E + 03 | - | /St/

Tl-194m | 5 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Tl-194 | 2 E−05 | - | - | 8 E + 05 | - | - | ET/ /

Tl-195 | 6 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Tl-197 | 8 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Tl-198m | 2 E−06 | - | - | 9 E + 04 | - | - | ET/ /

Tl-198 | 1 E−06 | - | - | 5 E + 04 | - | - | ET/ /

Tl-199 | 5 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Tl-200 | 8 E−07 | - | - | 3 E + 04 | - | - | ET/ /

Tl-201 | 4 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Tl-202 | 1 E−06 | - | - | 5 E + 04 | - | - | ET/ /

Tl-204 | 9 E−07 | - | - | 3 E + 04 | - | - | St/ /

Pb-195m | 7 E−06 | - | - | 2 E + 05 | - | - | ET/ /

Pb-198 | 2 E−06 | - | - | 9 E + 04 | - | - | ET/ /

Pb-199 | 4 E−06 | - | - | 1 E + 05 | - | - | ET/ /

Pb-200 | 1 E−06 | - | - | 4 E + 04 | - | - | ET/ /

Pb-201 | 2 E−06 | - | - | 7 E + 04 | - | - | ET/ /

Pb-202m | 1 E−06 | - | - | 6 E + 04 | - | - | ET/ /

Pb-202 | 4 E−08 | - | - | 1 E + 03 | - | - | St/ /

Pb-203 | 2 E−06 | - | - | 7 E + 04 | - | - | ET/ /

Pb-205 | 9 E−07 | - | - | 3 E + 04 | - | - | BS/ /

Pb-209 | 9 E−06 | - | - | 3 E + 05 | - | - | ET/ /

Pb-210 | 1 E−10 | - | - | 5 E + 00 | - | - | BS/ /

Pb-211 | 4 E−08 | - | - | 1 E + 03 | - | - | ET/ /

Pb-212 | 5 E−09 | - | - | 2 E + 02 | - | - | ET/ /

Pb-214 | 4 E−08 | - | - | 1 E + 03 | - | - | ET/ /

Bi-200 | 5 E−06 | 4 E−06 | - | 2 E + 05 | 1 E + 05 | - | ET/ET/

Bi-201 | 3 E−06 | 2 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Bi-202 | 2 E−06 | 2 E−06 | - | 9 E + 04 | 9 E + 04 | - | ET/ET/

Bi-203 | 7 E−07 | 7 E−07 | - | 2 E + 04 | 2 E + 04 | - | ET/ET/

Bi-205 | 4 E−07 | 4 E−07 | - | 1 E + 04 | 1 E + 04 | - | ET/ET/

Bi-206 | 2 E−07 | 2 E−07 | - | 9 E + 03 | 8 E + 03 | - | ET/ET/

Bi-207 | 4 E−07 | 1 E−07 | - | 1 E + 04 | 6 E + 03 | - | ET/St/

Bi-210m | 3 E−09 | 2 E−10 | - | 1 E + 02 | 9 E + 00 | - | K/St/

Bi-210 | 1 E−07 | 9 E−09 | - | 6 E + 03 | 3 E + 02 | - | K/St/

Bi-212 | 1 E−08 | 8 E−09 | - | 4 E + 02 | 3 E + 02 | - | ET/ET/

Bi-213 | 1 E−08 | 7 E−09 | - | 4 E + 02 | 2 E + 02 | - | ET/ET/

Bi-214 | 1 E−08 | 1 E−08 | - | 6 E + 02 | 4 E + 02 | - | ET/ET/

Po-203 | 5 E−06 | 4 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Po-205 | 4 E−06 | 3 E−06 | - | 1 E + 05 | 1 E + 05 | - | ET/ET/

Po-207 | 1 E−06 | 1 E−06 | - | 7 E + 04 | 6 E + 04 | - | ET/ET/

Po-210 | 7 E−10 | 2 E−10 | - | 2 E + 01 | 9 E + 00 | - | K/St/

At-207 | 1 E−06 | 2 E−07 | - | 4 E + 04 | 1 E + 04 | - | St/St/

At-211 | 7 E−09 | 5 E−09 | - | 2 E + 02 | 1 E + 02 | - | ET/St/

Rn-220 5 | 1 E−08 | - | - | 6 E + 02 | - | - | -

Rn-222 5 | 8 E−08 | - | - | 3 E + 03 | - | - | -

Fr-222 | 1 E−08 | - | - | 3 E + 02 | - | - | ET/ /

Fr-223 | 4 E−07 | - | - | 1 E + 04 | - | - | St/ /

Ra-223 | - | 9 E−11 | - | - | 3 E + 00 | - | /St/

Ra-224 | - | 2 E−10 | - | - | 8 E + 00 | - | /St/

Ra-225 | - | 1 E−10 | - | - | 4 E + 00 | - | /St/

Ra-226 | - | 2 E−10 | - | - | 9 E + 00 | - | /St/

Ra-227 | - | 8 E−07 | - | - | 3 E + 04 | - | /BS/

Ra-228 | - | 1 E−10 | - | - | 5 E + 00 | - | /BS/

Ac-224 | 1 E−08 | 6 E−09 | 5 E−09 | 6 E + 02 | 2 E + 02 | 2 E + 02 | BS/St/St

Ac-225 | 2 E−10 | 9 E−11 | 8 E−11 | 7 E + 00 | 3 E + 00 | 3 E + 00 | BS/St/St

Ac-226 | 1 E−09 | 6 E−10 | 5 E−10 | 4 E + 01 | 2 E + 01 | 2 E + 01 | ET/St/St

Ac-227 | 2 E−13 | 1 E−12 | 1 E−11 | 1 E−02 | 5 E−02 | 4 E−01 | BS/BS/St

Ac-228 | 6 E−09 | 3 E−08 | 4 E−08 | 2 E + 02 | 1 E + 03 | 1 E + 03 | BS/BS/St

Th-226 | - | 4 E−09 | 4 E−09 | - | 1 E + 02 | 1 E + 02 | /ET/ET

Th-227 | - | 9 E−11 | 7 E−11 | - | 3 E + 00 | 2 E + 00 | /St/St

Th-228 | - | 2 E−11 | 2 E−11 | - | 7 E−01 | 8 E−01 | /BS/St

Th-229 | - | 2 E−12 | 1 E−11 | - | 7 E−02 | 4 E−01 | /BS/St

Th-230 | - | 3 E−12 | 4 E−11 | - | 1 E−01 | 1 E + 00 | /BS/BS

Th-231 | - | 1 E−06 | 1 E−06 | - | 5 E + 04 | 5 E + 04 | /St/St

Th-232 | - | 3 E−12 | 4 E−11 | - | 1 E−01 | 1 E + 00 | /BS/BS

Th-234 | - | 1 E−07 | 9 E−08 | - | 3 E + 03 | 3 E + 03 | /St/St

Pa-227 | - | 4 E−09 | 4 E−09 | - | 1 E + 02 | 1 E + 02 | /ET/ET

Pa-228 | - | 1 E−08 | 1 E−08 | - | 3 E + 02 | 4 E + 02 | /BS/St

Pa-230 | - | 1 E−09 | 9 E−10 | - | 4 E + 01 | 3 E + 01 | /St/St

Pa-231 | - | 1 E−12 | 1 E−11 | - | 4 E−02 | 4 E−01 | /BS/BS

Pa-232 | - | 1 E−08 | 1 E−07 | - | 6 E + 02 | 7 E + 03 | /BS/BS

Pa-233 | - | 2 E−07 | 1 E−07 | - | 7 E + 03 | 6 E + 03 | /St/St

Pa-234 | - | 7 E−07 | 7 E−07 | - | 2 E + 04 | 2 E + 04 | /ET/ET

U-230 | 6 E−10 | 5 E−11 | 4 E−11 | 2 E + 01 | 2 E + 00 | 1 E + 00 | K/St/St

U-231 | 2 E−06 | 1 E−06 | 1 E−06 | 8 E + 04 | 4 E + 04 | 4 E + 04 | ET/St/St

U-232 | 5 E−11 | 1 E−10 | 2 E−11 | 2 E + 00 | 4 E + 00 | 7 E−01 | BS/St/ET

U-233 | 4 E−10 | 2 E−10 | 7 E−11 | 1 E + 01 | 9 E + 00 | 2 E + 00 | BS/St/ET

U-234 | 5 E−10 | 2 E−10 | 7 E−11 | 1 E + 01 | 9 E + 00 | 2 E + 00 | BS/St/ET

U-235 | 5 E−10 | 3 E−10 | 8 E−11 | 1 E + 01 | 1 E + 01 | 3 E + 00 | BS/St/ET

U-236 | 5 E−10 | 2 E−10 | 7 E−11 | 1 E + 01 | 1 E + 01 | 2 E + 00 | BS/St/ET

U-237 | 1 E−06 | 3 E−07 | 3 E−07 | 4 E + 04 | 1 E + 04 | 1 E + 04 | ET/St/St

U-238 | 5 E−10 | 3 E−10 | 8 E−11 | 2 E + 01 | 1 E + 01 | 3 E + 00 | BS/St/ET

U-239 | 1 E−05 | 9 E−06 | 9 E−06 | 5 E + 05 | 3 E + 05 | 3 E + 05 | ET/ET/ET

U-240 | 1 E−06 | 7 E−07 | 6 E−07 | 5 E + 04 | 2 E + 04 | 2 E + 04 | ET/St/St

Np-232 | - | 3 E−06 | - | - | 1 E + 05 | - | /BS/

Np-233 | - | 7 E−05 | - | - | 2 E + 06 | - | /ET/

Np-234 | - | 5 E−07 | - | - | 2 E + 04 | - | /ET/

Np-235 | - | 1 E−06 | - | - | 4 E + 04 | - | /BS/

Np-236 (1 E + 05 yr) | - | 4 E−11 | - | - | 1 E + 00 | - | /BS/

Np-236 (22 h) | - | 5 E−08 | - | - | 1 E + 03 | - | /BS/

Np-237 | - | 8 E−12 | - | - | 3 E−01 | - | /BS/

Np-238 | - | 1 E−07 | - | - | 4 E + 03 | - | /BS/

Np-239 | - | 5 E−07 | - | - | 1 E + 04 | - | /St/

Np-240 | - | 2 E−06 | - | - | 8 E + 04 | - | /ET/

Pu-234 | - | 3 E−08 | 3 E−08 | - | 1 E + 03 | 1 E + 03 | /St/St

Pu-235 | - | 9 E−05 | 8 E−05 | - | 3 E + 06 | 3 E + 06 | /ET/ET

Pu-236 | - | 1 E−11 | 7 E−11 | - | 6 E−01 | 2 E + 00 | /BS/St

Pu-237 | - | 1 E−06 | 1 E−06 | - | 7 E + 04 | 6 E + 04 | /St/St

Pu-238 | - | 6 E−12 | 5 E−11 | - | 2 E−01 | 1 E + 00 | /BS/St

Pu-239 | - | 5 E−12 | 6 E−11 | - | 2 E−01 | 2 E + 00 | /BS/BS

Pu-240 | - | 5 E−12 | 6 E−11 | - | 2 E−01 | 2 E + 00 | /BS/BS

Pu-241 | - | 2 E−10 | 2 E−09 | - | 1 E + 01 | 1 E + 02 | /BS/BS

Pu-242 | - | 5 E−12 | 6 E−11 | - | 2 E−01 | 2 E + 00 | /BS/BS

Pu-243 | - | 5 E−06 | 5 E−06 | - | 1 E + 05 | 1 E + 05 | /E/E

Pu-244 | - | 5 E−12 | 6 E−11 | - | 2 E−01 | 2 E + 00 | /BS/BS

Pu-245 | - | 9 E−07 | 8 E−07 | - | 3 E + 04 | 3 E + 04 | /St/St

Pu-246 | - | 8 E−08 | 8 E−08 | - | 3 E + 03 | 2 E + 03 | /St/St

Am-237 | - | 8 E−06 | - | - | 3 E + 05 | - | /ET/

Am-238 | - | 2 E−06 | - | - | 9 E + 04 | - | /BS/

Am-239 | - | 1 E−06 | - | - | 6 E + 04 | - | /ET/

Am-240 | - | 7 E−07 | - | - | 2 E + 04 | - | /ET/

Am-241 | - | 5 E−12 | - | - | 1 E−01 | - | /BS/

Am-242m | - | 5 E−12 | - | - | 1 E−01 | - | /BS/

Am-242 | - | 4 E−08 | - | - | 1 E + 03 | - | /St/

Am-243 | - | 5 E−12 | - | - | 1 E−01 | - | /BS/

Am-244m | - | 3 E−06 | - | - | 1 E + 05 | - | /BS/

Am-244 | - | 1 E−07 | - | - | 5 E + 03 | - | /BS/

Am-245 | - | 5 E−06 | - | - | 2 E + 05 | - | /ET/

Am-246m | - | 6 E−06 | - | - | 2 E + 05 | - | /ET/

Am-246 | - | 2 E−06 | - | - | 9 E + 04 | - | /ET/

Cm-238 | - | 1 E−07 | - | - | 4 E + 03 | - | /St/

Cm-240 | - | 2 E−10 | - | - | 7 E + 00 | - | /St/

Cm-241 | - | 2 E−08 | - | - | 8 E + 02 | - | /St/

Cm-242 | - | 1 E−10 | - | - | 5 E + 00 | - | /St/

Cm-243 | - | 7 E−12 | - | - | 2 E−01 | - | /BS/

Cm-244 | - | 9 E−12 | - | - | 3 E−01 | - | /BS/

Cm-245 | - | 5 E−12 | - | - | 1 E−01 | - | /BS/

Cm-246 | - | 5 E−12 | - | - | 1 E−01 | - | /BS/

Cm-247 | - | 5 E−12 | - | - | 2 E−01 | - | /BS/

Cm-248 | - | 1 E−12 | - | - | 5 E−02 | - | /BS/

Cm-249 | - | 8 E−06 | - | - | 3 E + 05 | - | /ET/

Cm-250 | - | 2 E−13 | - | - | 8 E−03 | - | /BS/

Bk-245 | - | 3 E−07 | - | - | 1 E + 04 | - | /St/

Bk-246 | - | 8 E−07 | - | - | 3 E + 04 | - | /ET/

Bk-247 | - | 3 E−12 | - | - | 1 E−01 | - | /BS/

Bk-249 | - | 1 E−09 | - | - | 5 E + 01 | - | /BS/

Bk-250 | - | 2 E−07 | - | - | 9 E + 03 | - | /BS/

Cf-244 | - | 1 E−08 | - | - | 5 E + 02 | - | /ET/

Cf-246 | - | 1 E−09 | - | - | 5 E + 01 | - | /St/

Cf-248 | - | 5 E−11 | - | - | 2 E + 00 | - | /BS/

Cf-249 | - | 3 E−12 | - | - | 1 E−01 | - | /BS/

Cf-250 | - | 7 E−12 | - | - | 2 E−01 | - | /BS/

Cf-251 | - | 3 E−12 | - | - | 1 E−01 | - | /BS/

Cf-252 | - | 1 E−11 | - | - | 6 E−01 | - | /BS/

Cf-253 | - | 5 E−10 | - | - | 2 E + 01 | - | /St/

Cf-254 | - | 2 E−11 | - | - | 8 E−01 | - | /BS/

Es-250 | - | 4 E−07 | - | - | 1 E + 04 | - | /BS/

Es-251 | - | 3 E−07 | - | - | 1 E + 04 | - | /St/

Es-253 | - | 2 E−10 | - | - | 9 E + 00 | - | /St/

Es-254m | - | 1 E−09 | - | - | 5 E + 01 | - | /St/

Es-254 | - | 6 E−11 | - | - | 2 E + 00 | - | /BS/

Fm-252 | - | 2 E−09 | - | - | 8 E + 01 | - | /St/

Fm-253 | - | 1 E−09 | - | - | 6 E + 01 | - | /St/

Fm-254 | - | 6 E−09 | - | - | 2 E + 02 | - | /ET/

Fm-255 | - | 2 E−09 | - | - | 8 E + 01 | - | /St/

Fm-257 | - | 1 E−10 | - | - | 4 E + 00 | - | /St/

Md-257 | - | 2 E−08 | - | - | 1 E + 03 | - | /St/

Md-258 | - | 1 E−10 | - | - | 4 E + 00 | - | /St/

Footnotes for Appendix A

1 A determination of whether the DACs are controlled by stochastic (St) or deterministic (organ or tissue) dose, or if they both give the same result (E), for each absorption type, is given in this column. The key to the organ notation for deterministic dose is: BS = Bone surface, ET = Extrathoracic, K = Kidney, L = Liver, and T = Thyroid. A blank indicates that no calculations were performed for the absorption type shown.

2 The ICRP identifies these materials as soluble or reactive gases and vapors or highly soluble or reactive gases and vapors. For tritiated water, the inhalation DAC values allow for an additional 50% absorption through the skin, as described in ICRP Publication No. 68, Dose Coefficients for Intakes of Radionuclides by Workers. For elemental tritium, the DAC values include a factor that irradiation from gas within the lungs might increase the dose by 20%.

3 A dash indicates no values given for this data category.

4 DAC values derived using hafnium tritide particle and are based on “observed activity” (i.e, only radiation emitted from the particle is considered). DAC values derived using methodology found in Radiological Control Programs for Special Tritium Compounds, DOE-HDBK-1184-2004.

5 These values are appropriate for protection from radon combined with its short-lived decay products and are based on information given in ICRP Publication 65: Protection Against Radon-222 at Home and at Work and in DOE-STD-1121-98: Internal Dosimetry. The values given are for 100% equilibrium concentration conditions of the short-lived radon decay products with the parent. To allow for an actual measured equilibrium concentration or a demonstrated equilibrium concentration, the values given in this table should be multiplied by the ratio (100%/actual %) or (100%/demonstrated %), respectively. Alternatively, the DAC values for Rn-220 and Rn-222 may be replaced by 2.5 working level (WL) and 0.83 WL, respectively, for appropriate limiting of decay product concentrations. A WL is any combination of short-lived radon decay products, in one liter of air without regard to the degree of equilibrium, that will result in the ultimate emission of 1.3 E + 05 MeV of alpha energy.

[72 FR 31927, June 8, 2007]

Appendix C to Part 835 Derived Air Concentration (DAC) for Workers From External Exposure During Immersion in a Cloud of Airborne Radioactive Material

a. The data presented in appendix C are to be used for controlling occupational exposures in accordance with § 835.209, identifying the need for air monitoring in accordance with § 835.403 and identifying the need for posting of airborne radioactivity areas in accordance with § 835.603(d).

b. The air immersion DAC values shown in this appendix are based on a stochastic dose limit of 5 rems (0.05 Sv) per year. Four columns of information are presented: (1) Radionuclide; (2) half-life in units of seconds (s), minutes (min), hours (h), days (d), or years (yr); (3) air immersion DAC in units of µCi/mL; and (4) air immersion DAC in units of Bq/m3. The data are listed by radionuclide in order of increasing atomic mass. The air immersion DACs were calculated for a continuous, nonshielded exposure via immersion in a semi-infinite cloud of airborne radioactive material. The DACs listed in this appendix may be modified to allow for submersion in a cloud of finite dimensions.

c. The DAC values are given for individual radionuclides. For known mixtures of radionuclides, determine the sum of the ratio of the observed concentration of a particular radionuclide and its corresponding DAC for all radionuclides in the mixture. If this sum exceeds unity (1), then the DAC has been exceeded. For unknown radionuclides, the most restrictive DAC (lowest value) for those isotopes not known to be absent shall be used.

Air Immersion DAC

Radionuclide | Half-life | (µCi/mL) | (Bq/m 3)

Ar-37 | 35.02 d | 3E + 00 | 1E + 11

Ar-39 | 269 yr | 1E-03 | 5E + 07

Ar-41 | 1.827 h | 3E-06 | 1E + 05

Kr-74 | 11.5 min | 3E-06 | 1E + 05

Kr-76 | 14.8 h | 1E-05 | 3E + 05

Kr-77 | 74.7 min | 4E-06 | 1E + 05

Kr-79 | 35.04 h | 1E-05 | 6E + 05

Kr-81 | 2.1E + 05 yr | 7E-04 | 2E + 07

Kr-83m | 1.83 h | 7E-02 | 2E + 09

Kr-85 | 10.72 yr | 7E-04 | 2E + 07

Kr-85m | 4.48 h | 2E-05 | 1E + 06

Kr-87 | 76.3 min | 4E-06 | 1E + 05

Kr-88 | 2.84 h | 1E-06 | 7E + 04

Xe-120 | 40.0 min | 1E-05 | 4E + 05

Xe-121 | 40.1 min | 2E-06 | 8E + 04

Xe-122 | 20.1 h | 8E-05 | 3E + 06

Xe-123 | 2.14 h | 6E-06 | 2E + 05

Xe-125 | 16.8 h | 1E-05 | 6E + 05

Xe-127 | 36.406 d | 1E-05 | 6E + 05

Xe-129m | 8.89 d | 2E-04 | 7E + 06

Xe-131m | 11.84 d | 5E-04 | 1E + 07

Xe-133 | 5.245 d | 1E-04 | 5E + 06

Xe-133m | 2.19 d | 1E-04 | 5E + 06

Xe-135 | 9.11 h | 1E-05 | 6E + 05

Xe-135m | 15.36 min | 1E-05 | 3E + 05

Xe-138 | 14.13 min | 3E-06 | 1E + 05

For any single radionuclide not listed above with decay mode other than alpha emission or spontaneous fission and with radioactive half-life less than two hours, the DAC value shall be 1 E-06 µCi/mL (7 E+04 Bq/m 3).

[72 FR 31940, June 8, 2007, as amended at 76 FR 20489, Apr. 13, 2011]; 82 FR 37514, Aug. 11, 2017

Appendix D to Part 835 Surface Contamination Values

The data presented in appendix D are to be used in identifying the need for posting of contamination and high contamination areas in accordance with § 835.603(e) and (f) and identifying the need for surface contamination monitoring and control in accordance with §§ 835.1101 and 835.1102.

Surface Contamination Values 1 in dpm/100 cm 2

Radionuclide | Removable 2 4 | Total (Fixed + Removable) 2 3

U-nat, U-235, U-238, and associated decay products | 7 1,000 | 7 5,000

Transuranics, Ra-226, Ra-228, Th-230, Th-228, Pa-231, Ac-227, I-125, I-129 | 20 | 500

Th-nat, Th-232, Sr-90, Ra-223, Ra-224, U-232, I-126, I-131, I-133 | 200 | 1,000

Beta-gamma emitters (nuclides with decay modes other than alpha emission or spontaneous fission) except Sr-90 and others noted above 5 | 1,000 | 5,000

Tritium and STCs 6 | 10,000 | See Footnote 6

1 The values in this appendix, with the exception noted in footnote 6 below, apply to radioactive contamination deposited on, but not incorporated into the interior or matrix of, the contaminated item. Where surface contamination by both alpha- and beta-gamma-emitting nuclides exists, the limits established for alpha- and beta-gamma-emitting nuclides apply independently.

2 As used in this table, dpm (disintegrations per minute) means the rate of emission by radioactive material as determined by correcting the counts per minute observed by an appropriate detector for background, efficiency, and geometric factors associated with the instrumentation.

3 The levels may be averaged over one square meter provided the maximum surface activity in any area of 100 cm 2 is less than three times the value specified. For purposes of averaging, any square meter of surface shall be considered to be above the surface contamination value if: (1) From measurements of a representative number of sections it is determined that the average contamination level exceeds the applicable value; or (2) it is determined that the sum of the activity of all isolated spots or particles in any 100 cm 2 area exceeds three times the applicable value.

4 The amount of removable radioactive material per 100 cm 2 of surface area should be determined by swiping the area with dry filter or soft absorbent paper, applying moderate pressure, and then assessing the amount of radioactive material on the swipe with an appropriate instrument of known efficiency. (Note—The use of dry material may not be appropriate for tritium.) When removable contamination on objects of surface area less than 100 cm 2 is determined, the activity per unit area shall be based on the actual area and the entire surface shall be wiped. It is not necessary to use swiping techniques to measure removable contamination levels if direct scan surveys indicate that the total residual surface contamination levels are within the limits for removable contamination.

5 This category of radionuclides includes mixed fission products, including the Sr-90 which is present in them. It does not apply to Sr-90 which has been separated from the other fission products or mixtures where the Sr-90 has been enriched.

6 Tritium contamination may diffuse into the volume or matrix of materials. Evaluation of surface contamination shall consider the extent to which such contamination may migrate to the surface in order to ensure the surface contamination value provided in this appendix is not exceeded. Once this contamination migrates to the surface, it may be removable, not fixed; therefore, a “Total” value does not apply. In certain cases, a “Total” value of 10,000 dpm/100 cm 2 may be applicable either to metals, of the types which form insoluble special tritium compounds that have been exposed to tritium; or to bulk materials to which particles of insoluble special tritium compound are fixed to a surface.

7 These limits only apply to the alpha emitters within the respective decay series.

[58 FR 65485, Dec. 14, 1993, as amended at 63 FR 59688, Nov. 4, 1998; 72 FR 31940, June 8, 2007; 74 FR 18116, Apr. 21, 2009]

Appendix E to Part 835 Values for Establishing Sealed Radioactive Source Accountability and Radioactive Material Posting and Labeling Requirements

The data presented in appendix E are to be used for identifying accountable sealed radioactive sources and radioactive material areas as those terms are defined at § 835.2(a), establishing the need for radioactive material area posting in accordance with § 835.603(g), and establishing the need for radioactive material labeling in accordance with § 835.605.

Nuclide | Activity (µCi)

H-3 | 1.5E + 08

Be-7 | 3.1E + 03

Be-10 | 1.4E + 05

C-14 | 4.6E + 06

Na-22 | 1.9E + 01

Al-26 | 1.5E + 01

Si-32 | 4.9E + 04

S-35 | 2.4E + 06

Cl-36 | 5.2E + 05

K-40 | 2.7E + 02

Ca-41 | 9.3E + 06

Ca-45 | 1.1E + 06

Sc-46 | 6.2E + 01

Ti-44 | 1.5E + 02

V-49 | 1.0E + 08

Mn-53 | 7.5E + 07

Mn-54 | 6.5E + 01

Fe-55 | 2.9E + 06

Fe-59 | 1.9E + 02

Fe-60 | 8.1E + 03

Co-56 | 3.9E + 01

Co-57 | 2.3E + 02

Co-58 | 1.3E + 02

Co-60 | 1.7E + 01

Ni-59 | 3.2E + 06

Ni-63 | 1.3E + 06

Zn-65 | 1.1E + 02

Ge-68 | 5.6E + 02

As-73 | 5.3E + 02

Se-75 | 6.3E + 01

Se-79 | 8.7E + 05

Rb-83 | 9.1E + 01

Rb-84 | 2.0E + 02

Sr-85 | 1.2E + 02

Sr-89 | 4.8E + 05

Sr-90 | 3.5E + 04

Y-88 | 3.3E + 01

Y-91 | 5.0E + 04

Zr-88 | 1.1E + 02

Zr-93 | 9.3E + 04

Zr-95 | 1.9E + 02

Nb-91 | 6.9E + 01

Nb-91m | 3.6E + 02

Nb-92 | 1.8E + 01

Nb-93m | 4.4E + 02

Nb-94 | 2.3E + 01

Nb-95 | 3.4E + 02

Mo-93 | 7.7E + 01

Tc-95m | 1.3E + 02

Tc-97 | 8.1E + 01

Tc-97m | 3.5E + 02

Tc-98 | 2.5E + 01

Tc-99 | 8.4E + 05

Ru-103 | 4.4E + 02

Ru-106 | 2.5E + 02

Rh-101 | 8.7E + 05

Rh-102 | 6.4E+05

Rh-102m | 3.0E+05

Pd-107 | 9.3E + 06

Ag-105 | 3.3E + 06

Ag-108m | 1.8E + 01

Ag-110m | 2.2E + 01

Cd-109 | 1.6E + 02

Cd-113m | 2.0E + 04

Cd-115m | 1.0E + 04

In-114m | 7.7E + 02

Sn-113 | 3.1E + 02

Sn-119m | 3.3E + 02

Sn-121m | 8.1E + 05

Sn-123 | 1.3E + 04

Sn-126 | 1.8E + 02

Sb-124 | 9.1E + 01

Sb-125 | 6.7E + 01

Te-121m | 1.8E + 02

Te-123m | 2.8E + 02

Te-125m | 4.4E + 02

Te-127m | 8.0E + 02

Te-129m | 2.3E + 03

I-125 | 3.5E + 02

I-129 | 1.8E + 02

Cs-134 | 2.6E + 01

Cs-135 | 1.3E + 06

Cs-137 | 6.0E + 01

Ba-133 | 5.1E + 01

La-137 | 2.7E + 05

Ce-139 | 2.4E + 02

Ce-141 | 2.4E + 03

Ce-144 | 1.4E + 03

Pm-143 | 1.3E + 02

Pm-144 | 2.9E + 01

Pm-145 | 2.6E + 02

Pm-146 | 4.4E + 01

Pm-147 | 7.7E + 05

Pm-148m | 1.0E + 02

Sm-145 | 2.4E + 06

Sm-146 | 4.0E + 02

Sm-151 | 2.5E + 05

Eu-148 | 1.1E + 06

Eu-149 | 1.1E + 07

Eu-152 | 3.1E + 01

Eu-154 | 3.1E + 01

Eu-155 | 3.6E + 02

Gd-146 | 5.1E + 05

Gd-148 | 9.0E + 01

Gd-151 | 2.9E + 06

Gd-153 | 2.1E + 02

Tb-157 | 2.5E + 03

Tb-158 | 9.0E + 04

Tb-160 | 1.2E + 02

Dy-159 | 1.0E + 07

Ho-166m | 2.1E + 01

Tm-170 | 8.4E + 03

Tm-171 | 2.8E + 04

Yb-169 | 5.5E + 02

Lu-173 | 1.8E + 06

Lu-174 | 9.3E + 05

Lu-174m | 1.0E + 06

Lu-177m | 5.8E + 01

Hf-172 | 7.3E + 04

Hf-175 | 3.0E + 06

Hf-178m | 8.7E + 03

Hf-181 | 3.4E + 02

Hf-182 | 7.5E + 03

Ta-179 | 9.3E + 06

Ta-182 | 7.3E + 01

W-181 | 1.0E + 03

W-185 | 3.9E + 06

W-188 | 6.3E + 04

Re-183 | 5.3E + 02

Re-184 | 2.6E + 02

Re-184m | 1.5E + 02

Re-186m | 3.4E + 05

Os-185 | 1.3E + 02

Os-194 | 6.4E + 04

Ir-192 | 1.3E + 02

Ir-192m | 1.4E + 05

Ir-194m | 2.7E + 01

Pt-193 | 8.7E + 07

Au-195 | 4.8E + 02

Hg-194 | 5.2E + 04

Hg-203 | 4.9E + 02

Tl-204 | 2.2E + 04

Pb-202 | 1.9E + 05

Pb-205 | 9.0E + 01

Pb-210 | 9.2E + 01

Bi-207 | 1.7E + 01

Bi-208 | 1.5E + 01

Bi-210m | 1.2E + 03

Po-209 | 6.3E + 03

Po-210 | 1.2E + 03

Ra-226 | 2.2E + 02

Ra-228 | 1.5E + 03

Ac-227 | 4.2E + 00

Th-228 | 8.4E + 01

Th-229 | 3.1E + 01

Th-230 | 5.4E + 00

Th-232 | 9.3E + 01

Pa-231 | 3.0E + 01

U-232 | 1.0E + 02

U-233 | 3.9E + 02

U-234 | 2.9E + 02

U-235 | 6.7E + 01

U-236 | 3.1E + 02

U-238 | 3.5E + 02

Np-235 | 1.1E + 02

Np-236 | 2.1E + 01

Np-237 | 4.9E + 01

Pu-236 | 2.0E + 02

Pu-237 | 3.3E + 02

Pu-238 | 9.0E + 01

Pu-239 | 8.4E + 01

Pu-240 | 8.4E + 01

Pu-241 | 4.6E + 03

Pu-242 | 8.7E + 01

Pu-244 | 9.0E + 01

Am-241 | 7.2E + 01

Am-242m | 1.1E + 02

Am-243 | 7.3E + 01

Cm-241 | 1.0E + 05

Cm-242 | 6.2E + 02

Cm-243 | 4.8E + 01

Cm-244 | 1.5E + 02

Cm-245 | 5.0E + 01

Cm-246 | 1.0E + 02

Cm-247 | 8.5E + 01

Cm-248 | 2.8E + 01

Cm-250 | 5.4E + 00

Bk-247 | 6.0E + 01

Bk-249 | 2.7E + 04

Cf-248 | 4.4E + 02

Cf-249 | 5.5E + 01

Cf-250 | 1.2E + 02

Cf-251 | 5.3E + 01

Cf-252 | 5.2E + 00

Cf-254 | 1.2E + 02

Es-254 | 6.3E + 01

Es-255 | 8.8E + 03

Fm-257 | 5.1E + 02

Md-258 | 6.1E + 02

Any alpha emitting radionuclide not listed in appendix E and mixtures of alpha emitters of unknown composition have a value of 10 µCi.

With the exception that any type of STC has a value of 10 Ci, any radionuclide other than alpha emitting radionuclides not listed in appendix E and mixtures of beta emitters of unknown composition have a value of 100 µCi.

Note:

Where there is involved a mixture of radionuclides in known amounts, derive the value for the mixture as follows: determine, for each radionuclide in the mixture, the ratio between the quantity present in the mixture and the value otherwise established for the specific radionuclide when not in the mixture. If the sum of such ratios for all radionuclides in the mixture exceeds unity (1), then the accountability criterion has been exceeded.

[72 FR 31940, June 8, 2007, as amended at 82 FR 37514, Aug. 11, 2017]

PART 840 EXTRAORDINARY NUCLEAR OCCURRENCES

Authority: Sec. 161 of the Atomic Energy Act of 1954, Pub. L. 83-703, 68 Stat. 919 (42 U.S.C. 2201); sec. 170 of the Atomic Energy Act of 1954, Pub. L. 85-256, 71 Stat. 576, as amended by Pub. L. 89-645, 80 Stat. 891 (42 U.S.C. 2210); Department of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565-613 (42 U.S.C. 7101-7352).

Source: 49 FR 21473, May 21, 1984, unless otherwise noted.

§ 840.1 Scope and purpose.

(a) Scope. This subpart applies to those DOE contractor activities to which the nuclear hazards indemnity provisions in 41 CFR 9-50.704-6 apply, and to other persons indemnified with respect to such activities.

(b) Purpose. One purpose of this subpart is to set forth the criteria which the DOE proposes to follow in order to determine whether there has been an “extraordinary nuclear occurrence.” The other purpose is to establish the conditions of the waivers of defenses proposed for incorporation in indemnity agreements.

(1) The system is to come into effect only where the discharge or dispersal constitutes a substantial amount of source, special nuclear or byproduct material, or has caused substantial radiation levels offsite. The various limits in present DOE regulations are not appropriate for direct application in the determination of an “extraordinary nuclear occurrence,” for they were arrived at with other purposes in mind, and those limits have been set at a level which is conservatively arrived at by incorporating a significant safety factor. Thus, a discharge or dispersal which exceeds the limits in DOE regulations, or in DOE orders, although possible cause for concern, is not one which would be expected to cause substantial injury or damage unless it exceeds by some significant multiple the appropriate regulatory limit. Accordingly, in arriving at the values in the criteria to be deemed “substantial” it is more appropriate to adopt values separate from DOE health and safety orders, and, of course the selection of these values will not in any way affect such orders. A substantial discharge, for purposes of the criteria, represents a perturbation of the environment which is clearly above that which could be anticipated from the conduct of normal activities. The criteria are intended solely for the purposes of administration of DOE statutory responsibilities under Pub. L. 89-645, and are not intended to indicate a level of discharge or dispersal at which damage is likely to occur, or even a level at which some type of protective action is indicated. It should be clearly understood that the criteria in no way establish or indicate that there is a specific threshold of exposure at which biological damage from radiation will take place. It cannot be emphasized too frequently that the levels set to be used as criteria for the first part of the determination, that is, the criteria for amounts offsite or radiation levels offsite which are substantial, are not meant to indicate that, because such amounts or levels are determined to be substantial for purposes of administration, they are “substantial” in terms of their propensity for causing injury or damage.

(2) It is the purpose of the second part of the determination that DOE decide whether there have in fact been or will probably be substantial damages to persons offsite or property offsite. The criteria for substantial damages were formulated, and the numerical values selected, on a wholly different basis from that on which the criteria used for the first part of the determination with respect to substantial discharge were derived. The only interrelation between the values selected for the discharge criteria and the damage criteria is that the discharge values are set so low that it is extremely unlikely the damage criteria could be satisfied unless the discharge values have been exceeded.

(3) The first part of the test is designed so that DOE can assure itself that something exceptional has occurred; that something untoward and unexpected has in fact taken place and that this event is of sufficient significance to raise the possibility that some damage to persons or property offsite has resulted or may result. If there appears to be no damage, the waivers will not apply because DOE will be unable, under the second part of the test, to make a determination that “substantial damages” have resulted or will probably result. If damages have resulted or will probably result, they could vary from de minimis to serious, and the waivers will not apply until the damages, both actual and probable, are determined to be “substantial” within the second part of the test.

(4) The presence or absence of an extraordinary nuclear occurrence determination does not concomitantly determine whether or not a particular claimant will recover on his claim. In effect, it is intended primarily to determine whether certain potential obstacles to recovery are to be removed from the route the claimant would ordinarily follow to seek compensation for his injury or damage. If there has not been an extraordinary nuclear occurrence determination, the claimant must proceed (in the absence of settlement) with a tort action subject to whatever issues must be met, and whatever defenses are available to the defendant, under the law applicable in the relevant jurisdiction. If there has been an extraordinary nuclear occurrence determination, the claimant must still proceed (in the absence of settlement) with a tort action, but the claimant's burden is substantially eased by the elimination of certain issues which may be involved and certain defenses which may be available to the defendant. In either case the defendant may defend with respect to such of the following matters as are in issue in any given claim: the nature of the claimant's alleged damages, the causal relationship between the event and the alleged damages, and the amount of the alleged damages.

§ 840.2 Procedures.

(a) DOE may initiate, on its own motion, the making of a determination as to whether or not there has been an extraordinary nuclear occurrence. In the event DOE does not so initiate the making of a determination, any affected person, or any person with whom an indemnity agreement is executed may petition DOE for a determination of whether or not there has been an extraordinary nuclear occurrence. If DOE does not have, or does not expect to have, within 7 days after it has received notification of an alleged event, enough information available to make a determination that there has been an extraordinary nuclear occurrence, DOE will publish a notice in the Federal Register setting forth the date and place of the alleged event and requesting any persons having knowledge thereof to submit their information to DOE.

(b) When a procedure is initiated under paragraph (a) of this section, the principal staff which will begin immediately to assemble the relevant information and prepare a report on which the DOE can make its determination will consist of the Directors or their designees of the following Divisions or Offices: Office of Nuclear Safety, Office of Operational Safety, Office of Health and Environmental Research, the General Counsel or his designee, and a representative of the program division whose facility or device may be involved.

§ 840.3 Determination of extraordinary nuclear occurrence.

If the DOE determines that both of the criteria set forth in § 840.4 and § 840.5 have been met, it will make the determination that there has been an extraordinary nuclear occurrence. If the DOE publishes a notice in the Federal Register in accordance with § 840.2(a) and does not make a determination within 90 days thereafter that there has been an extraordinary nuclear occurrence, the alleged event will be deemed not to be an extraordinary nuclear occurrence. The time for the making of a determination may be extended by DOE by notice published in the Federal Register.

§ 840.4 Criterion I—Substantial discharge of radioactive material or substantial radiation levels offsite.

DOE will determine that there has been a substantial discharge or dispersal of radioactive material offsite, or that there have been substantial levels of radiation offsite, when as a result of an event comprised of one or more related happenings, radioactive material is released from its intended place of confinement or radiation levels occur offsite and either of the following findings are also made:

(a) DOE finds that one or more persons offsite were, could have been, or might be exposed to radiation or to radioactive material, resulting in a dose or in a projected dose in excess of one of the levels in the following table:

Total Projected Radiation Doses

Critical organ | Dose (rems)

Thyroid | 30

Whole Body | 20

Bone Marrow | 20

Skin | 60

Other organs or tissues | 30

Exposures from the following types of sources of radiation shall be included:

(1) Radiation from sources external to the body;

(2) Radioactive material that may be taken into the body from its occurrence in air or water; and

(3) Radioactive material that may be taken into the body from its occurrence in food or on terrestrial surfaces.

(b) DOE finds that—

(1) Surface contamination of at least a total of any 100 square meters of offsite property has occurred as the result of a release of radioactive material from a production or utilization facility or device and such contamination is characterized by levels of radiation in excess of one of the values listed in column 1 or column 2 of the following table, or

(2) Surface contamination of any offsite property has occurred as the result of a release of radioactive material in the course of transportation and such contamination is characterized by levels of radiation in excess of one of the values listed in column 2 of the following table:

Total Surface Contamination Levels 1

Type of emitter | Column 1—Offsite property 2 | Column 2—Other offsite property

Alpha emission from transuranic isotopes | 3.5 microcuries per square meter | 0.35 microcuries per square meter.

Alpha emission from isotopes other than transuranic isotopes | 35 microcuries per square meter | 3.5 microcuries per square meter.

Beta or gamma emission | 40 millirads/hour 1 cm (measured through not more than 7 milligrams per square centimeter of total absorber) | 4 millirads/hour 1 cm (measured through not more than 7 milligrams per square centimeter of total absorber).

1 The maximum levels (above background), observed or projected, 8 or more hours after initial deposition.

2 Contiguous to site, owned or leased by person with whom an indemnity agreement is executed.

[49 FR 21473, May 21, 1984; 49 FR 24374, June 13, 1984]

§ 840.5 Criterion II—Substantial damages to persons offsite or property offsite.

(a) After DOE has determined that an event has satisfied Criterion I, DOE will determine that the event has resulted or will probably result in substantial damages to persons offsite or property offsite if any of the following findings are made:

(1) DOE finds that such event has resulted in the death or hospitalization, within 30 days of the event, of five or more people located offsite showing objective clinical evidence of physical injury from exposure to the radioactive, toxic, explosive, or other hazardous properties of source, special nuclear, or byproduct material; or

(2) DOE finds that $2,500,000 or more of damage offsite has been or will probably be sustained by any one person, or $5 million or more of such damage in the aggregate has been or will probably be sustained, as the result of such event; or

(3) DOE finds that $5,000 or more of damage offsite has been or will probably be sustained by each of 50 or more persons, provided that $1 million or more of such damage in the aggregate has been or will probably be sustained, as the result of such event.

(b) As used in paragraphs (a) (2) and (3) of this section “damage” shall be that arising out of or resulting from the radioactive, toxic, explosive, or other hazardous properties of source, special nuclear, or byproduct material, and shall be based upon estimates of one or more of the following:

(1) Total cost necessary to put affected property back into use.

(2) Loss of use of affected property.

(3) Value of affected property where not practical to restore to use.

(4) Financial loss resulting from protective actions appropriate to reduce or avoid exposure to radiation or to radioactive materials.

PART 850 CHRONIC BERYLLIUM DISEASE PREVENTION PROGRAM

Authority: 42 U.S.C. 2201(i)(3), (p); 42 U.S.C. 2282c; 29 U.S.C. 668; 42 U.S.C. 7101 et seq.; 50 U.S.C. 2401 et seq., E.O. 12196, 3 CFR 1981 comp., at 145 as amended.

Source: 64 FR 68905, Dec. 8, 1999, unless otherwise noted.

Subpart A General Provisions

§ 850.1 Scope.

This part provides for establishment of a chronic beryllium disease prevention program (CBDPP) that supplements and is deemed an integral part of the worker safety and health program under part 851 of this chapter.

[71 FR 6931, Feb. 9, 2006]

§ 850.2 Applicability.

(a) This part applies to:

(1) DOE offices responsible for operations or activities that involve present or past exposure, or the potential for exposure, to beryllium at DOE facilities;

(2) DOE contractors with operations or activities that involve present or past exposure, or the potential for exposure, to beryllium at DOE facilities; and

(3) Any current DOE employee, DOE contractor employee, or other worker at a DOE facility who is or was exposed or potentially exposed to beryllium at a DOE facility.

(b) This part does not apply to:

(1) Beryllium articles; and

(2) DOE laboratory operations that meet the definition of laboratory use of hazardous chemicals in 29 CFR 1910.1450, Occupational Exposure to Hazardous Chemical in Laboratories.

§ 850.3 Definitions.

(a) As used in this part:

Action level means the level of airborne concentration of beryllium established pursuant to section 850.23 of this part that, if met or exceeded, requires the implementation of worker protection provisions specified in that section.

Authorized person means any person required by work duties to be in a regulated area.

Beryllium means elemental beryllium and any insoluble beryllium compound or alloy containing 0.1 percent beryllium or greater that may be released as an airborne particulate.

Beryllium activity means an activity taken for, or by, DOE at a DOE facility that can expose workers to airborne beryllium, including but not limited to design, construction, operation, maintenance, or decommissioning, and which may involve one DOE facility or operation or a combination of facilities and operations.

Beryllium article means a manufactured item that is formed to a specific shape or design during manufacture, that has end-use functions that depend in whole or in part on its shape or design during end use, and that does not release beryllium or otherwise result in exposure to airborne concentrations of beryllium under normal conditions of use.

Beryllium-associated worker means a current worker who is or was exposed or potentially exposed to airborne concentrations of beryllium at a DOE facility, including:

(1) A beryllium worker;

(2) A current worker whose work history shows that the worker may have been exposed to airborne concentrations of beryllium at a DOE facility;

(3) A current worker who exhibits signs or symptoms of beryllium exposure; and

(4) A current worker who is receiving medical removal protection benefits.

Beryllium emergency means any occurrence such as, but not limited to, equipment failure, container rupture, or failure of control equipment or operations that results in an unexpected and significant release of beryllium at a DOE facility.

Beryllium-induced lymphocyte proliferation test (Be-LPT) is an in vitro measure of the beryllium antigen-specific, cell-mediated immune response.

Beryllium worker means a current worker who is regularly employed in a DOE beryllium activity.

Breathing zone is defined as a hemisphere forward of the shoulders, centered on the mouth and nose, with a radius of 6 to 9 inches.

DOE means the U.S. Department of Energy.

DOE contractor means any entity under contract with DOE (or its subcontractor) that has responsibility for performing beryllium activities at DOE facilities.

DOE facility means any facility operated by or for DOE.

Head of DOE Field Element means an individual who is the manager or head of the DOE operations office or field office, or any official to whom the Head of DOE Field Element delegates his or her functions under this part.

High-efficiency particulate air (HEPA) filter means a filter capable of trapping and retaining at least 99.97 percent of 0.3 micrometer monodispersed particles.

Immune response refers to the series of cellular events by which the immune system reacts to challenge by an antigen.

Medical removal protection benefits means the employment rights established by section 850.35 of this part for beryllium-associated workers who voluntarily accept temporary or permanent medical removal from beryllium areas following a recommendation by the Site Occupational Medicine Director.

Operational area means an area where workers are routinely in the presence of beryllium as part of their work activity.

Regulated area means an area demarcated by the responsible employer in which the airborne concentration of beryllium exceeds, or can reasonably be expected to exceed, the action level.

Removable contamination means beryllium contamination that can be removed from surfaces by nondestructive means, such as casual contact, wiping, brushing or washing.

Responsible employer means:

(1) For DOE contractor employees, the DOE contractor office that is directly responsible for the safety and health of DOE contractor employees while performing a beryllium activity or other activity at a DOE facility; or

(2) For DOE employees, the DOE office that is directly responsible for the safety and health of DOE Federal employees while performing a beryllium activity or other activity at a DOE facility; and

(3) Any person acting directly or indirectly for such office with respect to terms and conditions of employment of beryllium-associated workers.

Site Occupational Medical Director (SOMD) means the physician responsible for the overall direction and operation of the site occupational medicine program.

Unique identifier means the part of a paired set of labels, used in records that contain confidential information, that does not identify individuals except by using the matching label.

Worker means a person who performs work for or on behalf of DOE, including a DOE employee, an independent contractor, a DOE contractor or subcontractor employee, or any other person who performs work at a DOE facility.

Worker exposure means the exposure of a worker to airborne beryllium that would occur if the worker were not using respiratory protective equipment.

(b) Terms undefined in this part that are defined in the Atomic Energy Act of 1954 shall have the same meaning as under that Act.

§ 850.4 Enforcement.

DOE may take appropriate steps pursuant to part 851 of this chapter to enforce compliance by contractors with this part and any DOE-approved CBDPP.

[71 FR 6931, Feb. 9, 2006]

§ 850.5 Dispute resolution.

(a) Subject to paragraphs (b) and (c) of this section, any worker who is adversely affected by an action taken, or failure to act, under this part may petition the Office of Hearings and Appeals for relief in accordance with 10 CFR part 1003, Subpart G.

(b) The Office of Hearings and Appeals may not accept a petition from a worker unless the worker requested the responsible employer to correct the violation, and the responsible employer refused or failed to take corrective action within a reasonable time.

(c) If the dispute relates to a term or condition of employment that is covered by a grievance-arbitration provision in a collective bargaining agreement, the worker must exhaust all applicable grievance-arbitration procedures before filing a petition for relief with the Office of Hearings and Appeals. A worker is deemed to have exhausted all applicable grievance-arbitration procedures if 150 days have passed since the filing of a grievance and a final decision on it has not been issued.

Subpart B Administrative Requirements

§ 850.10 Development and approval of the CBDPP.

(a) Preparation and submission of initial CBDPP to DOE. (1) The responsible employer at a DOE facility must ensure that a CBDPP is prepared for the facility and submitted to the appropriate Head of DOE Field Element before beginning beryllium activities, but no later than April 6, 2000 of this part.

(2) If the CBDPP has separate sections addressing the activities of multiple contractors at the facility, the Head of DOE Field Element will designate a single DOE contractor to review and approve the sections prepared by other contractors, so that a single consolidated CBDPP for the facility is submitted to the Head of DOE Field Element for review and approval.

(b) DOE review and approval. The appropriate Head of DOE Field Element must review and approve the CBDPP.

(1) The initial CBDPP and any updates are deemed approved 90 days after submission if they are not specifically approved or rejected by DOE earlier.

(2) The responsible employer must furnish a copy of the approved CBDPP, upon request, to the DOE Director, Office of Environment, Health, Safety and Security or designee, DOE program offices, and affected workers or their designated representatives.

(c) Update. The responsible employer must submit an update of the CBDPP to the appropriate Head of DOE Field Element for review and approval whenever a significant change or significant addition to the CBDPP is made or a change in contractors occurs. The Head of DOE Field Element must review the CBDPP at least annually and, if necessary, require the responsible employer to update the CBDPP.

(d) Labor Organizations. If a responsible employer employs or supervises beryllium-associated workers who are represented for collective bargaining by a labor organization, the responsible employer must:

(1) Give the labor organization timely notice of the development and implementation of the CBDPP and any updates thereto; and

(2) Upon timely request, bargain concerning implementation of this part, consistent with the Federal labor laws.

[64 FR 68905, Dec. 8, 1999, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5008, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 850.11 General CBDPP requirements.

(a) The CBDPP must specify the existing and planned operational tasks that are within the scope of the CBDPP. The CBDPP must augment and, to the extent feasible, be integrated into the existing worker protection programs that cover activities at the facility.

(b) The detail, scope, and content of the CBDPP must be commensurate with the hazard of the activities performed, but in all cases the CBDPP must:

(1) Include formal plans and measures for maintaining exposures to beryllium at or below the permissible exposure level prescribed in § 850.22;

(2) Satisfy each requirement in subpart C of this part;

(3) Contain provisions for:

(i) Minimizing the number of workers exposed and potentially exposed to beryllium;

(ii) Minimizing the number of opportunities for workers to be exposed to beryllium;

(iii) Minimizing the disability and lost work time of workers due to chronic beryllium disease, beryllium sensitization and associated medical care; and

(iv) Setting specific exposure reduction and minimization goals that are appropriate for the beryllium activities covered by the CBDPP to further reduce exposure below the permissible exposure limit prescribed in § 850.22.

§ 850.12 Implementation.

(a) The responsible employer must manage and control beryllium exposures in all DOE beryllium activities consistent with the approved CBDPP.

(b) No person employed by DOE or a DOE contractor may take or cause any action inconsistent with the requirements of:

(1) This part,

(2) An approved CBDPP, and

(3) Any other Federal statute or regulation concerning the exposure of workers to beryllium at DOE facilities.

(c) No task involving potential exposure to airborne beryllium that is outside the scope of the existing CBDPP may be initiated until an update of the CBDPP is approved by the Head of DOE Field Element, except in an unexpected situation and, then, only upon approval of the Head of DOE Field Element.

(d) Nothing in this part precludes a responsible employer from taking any additional protective action that it determines to be necessary to protect the health and safety of workers.

(e) Nothing in this part affects the responsibilities of DOE officials under the Federal Employee Occupational Safety and Health Program (29 CFR part 1960) and related DOE directives.

§ 850.13 Compliance.

(a) The responsible employer must conduct activities in compliance with its CBDPP.

(b) The responsible employer must achieve compliance with all elements of its CBDPP no later than January 7, 2002.

(c) With respect to a particular beryllium activity, the contractor in charge of the activity is responsible for complying with this part. If no contractor is responsible for a beryllium activity, DOE must ensure implementation of, and compliance with, this part.

Subpart C Specific Program Requirements

§ 850.20 Baseline beryllium inventory.

(a) The responsible employer must develop a baseline inventory of the locations of beryllium operations and other locations of potential beryllium contamination, and identify the workers exposed or potentially exposed to beryllium at those locations.

(b) In conducting the baseline inventory, the responsible employer must:

(1) Review current and historical records;

(2) Interview workers;

(3) Document the characteristics and locations of beryllium at the facility; and

(4) Conduct air, surface, and bulk sampling.

(c) The responsible employer must ensure that:

(1) The baseline beryllium inventory is managed by a qualified individual (e.g., a certified industrial hygienist); and

(2) The individuals assigned to this task have sufficient knowledge and experience to perform such activities properly.

§ 850.21 Hazard assessment.

(a) If the baseline inventory establishes the presence of beryllium, the responsible employer must conduct a beryllium hazard assessment that includes an analysis of existing conditions, exposure data, medical surveillance trends, and the exposure potential of planned activities. The exposure determinants, characteristics and exposure potential of activities must be prioritized so that the activities with the greatest risks of exposure are evaluated first.

(b) The responsible employer must ensure that:

(1) The hazard assessment is managed by a qualified individual (e.g., a certified industrial hygienist); and

(2) The individuals assigned to this task have sufficient knowledge and experience to perform such activities properly.

§ 850.22 Permissible exposure limit.

The responsible employer must assure that no worker is exposed to an airborne concentration of beryllium greater than the permissible exposure limit established in 29 CFR 1910.1000, as measured in the worker's breathing zone by personal monitoring, or a more stringent TWA PEL that may be promulgated by the Occupational Safety and Health Administration as a health standard.

§ 850.23 Action level.

(a) The responsible employer must include in its CBDPP an action level that is no greater than 0.2 µg/m 3, calculated as an 8-hour TWA exposure, as measured in the worker's breathing zone by personal monitoring.

(b) If an airborne concentration of beryllium is at or above the action level, the responsible employer must implement §§ 850.24(c) (periodic monitoring), 850.25 (exposure reduction and minimization), 850.26 (regulated areas), 850.27 (hygiene facilities and practices), 850.28 (respiratory protection), 850.29 (protective clothing and equipment), and 850.38 (warning signs) of this part.

§ 850.24 Exposure monitoring.

(a) General. The responsible employer must ensure that:

(1) Exposure monitoring is managed by a qualified individual (e.g., a certified industrial hygienist); and

(2) The individuals assigned to this task have sufficient industrial hygiene knowledge and experience to perform such activities properly.

(b) Initial monitoring. The responsible employer must perform initial monitoring in areas that may have airborne beryllium, as shown by the baseline inventory and hazard assessment. The responsible employer must apply statistically-based monitoring strategies to obtain a sufficient number of sample results to adequately characterize exposures, before reducing or terminating monitoring.

(1) The responsible employer must determine workers' 8-hour TWA exposure levels by conducting personal breathing zone sampling.

(2) Exposure monitoring results obtained within the 12 months preceding the effective date of this part may be used to satisfy this requirement if the measurements were made as provided in paragraph (b)(1) of this section.

(c) Periodic exposure monitoring. The responsible employer must conduct periodic monitoring of workers who work in areas where airborne concentrations of beryllium are at or above the action level. The monitoring must be conducted in a manner and at a frequency necessary to represent workers' exposure, as specified in the CBDPP. This periodic exposure monitoring must be performed at least every 3 months (quarterly).

(d) Additional exposure monitoring. The responsible employer must perform additional monitoring if operations, maintenance or procedures change, or when the responsible employer has any reason to suspect such a change has occurred.

(e) Accuracy of monitoring. The responsible employer must use a method of monitoring and analysis that has an accuracy of not less than plus or minus 25 percent, with a confidence level of 95 percent, for airborne concentrations of beryllium at the action level.

(f) Analysis. The responsible employer must have all samples collected to satisfy the monitoring requirements of this part analyzed in a laboratory accredited for metals by the American Industrial Hygiene Association (AIHA) or a laboratory that demonstrates quality assurance for metals analysis that is equivalent to AIHA accreditation.

(g) Notification of monitoring results. (1) The responsible employer must, within 10 working days after receipt of any monitoring results, notify the affected workers of monitoring results in writing. This notification of monitoring results must be:

(i) Made personally to the affected worker; or

(ii) Posted in location(s) that is readily accessible to the affected worker, but in a manner that does not identify the individual to other workers.

(2) If the monitoring results indicate that a worker's exposure is at or above the action level, the responsible employer must include in the notice:

(i) A statement that the action level has been met or exceeded; and

(ii) A description of the corrective action being taken by the responsible employer to reduce the worker's exposure to below the action level, if practicable.

(3) If the monitoring results indicate that worker exposure is at or above the action level, the responsible employer must also notify DOE and the SOMD of these results within 10 working days after receipt.

§ 850.25 Exposure reduction and minimization.

(a) The responsible employer must ensure that no worker is exposed above the exposure limit prescribed in § 850.22.

(b) The responsible employer must, in addition:

(1) Where exposure levels are at or above the action level, establish a formal exposure reduction and minimization program to reduce exposure levels to below the action level, if practicable. This program must be described in the responsible employer's CBDPP and must include:

(i) Annual goals for exposure reduction and minimization;

(ii) A rationale for and a strategy for meeting the goals;

(iii) Actions that will be taken to achieve the goals; and

(iv) A means of tracking progress towards meeting the goals or demonstrating that the goals have been met.

(2) Where exposure levels are below the action level, implement actions for reducing and minimizing exposures, if practicable. The responsible employer must include in the CBDPP a description of the steps to be taken for exposure reduction and minimization and a rationale for those steps.

(c) The responsible employer must implement exposure reduction and minimization actions using the conventional hierarchy of industrial hygiene controls (i.e., engineering controls, administrative controls, and personal protective equipment in that order).

§ 850.26 Regulated areas.

(a) If airborne concentrations of beryllium in areas in DOE facilities are measured at or above the action level, the responsible employer must establish regulated areas for those areas.

(b) The responsible employer must demarcate regulated areas from the rest of the workplace in a manner that adequately alerts workers to the boundaries of such areas.

(c) The responsible employer must limit access to regulated areas to authorized persons.

(d) The responsible employer must keep records of all individuals who enter regulated areas. These records must include the name, date, time in and time out, and work activity.

§ 850.27 Hygiene facilities and practices.

(a) General. The responsible employer must assure that in areas where workers are exposed to beryllium at or above the action level, without regard to the use of respirators:

(1) Food or beverage and tobacco products are not used;

(2) Cosmetics are not applied, except in change rooms or areas and shower facilities required under paragraphs (b) and (c) of this section; and

(3) Beryllium workers are prevented from exiting areas that contain beryllium with contamination on their bodies or their personal clothing.

(b) Change rooms or areas. The responsible employer must provide clean change rooms or areas for beryllium workers who work in regulated areas.

(1) Separate facilities free of beryllium must be provided for beryllium workers to change into, and store, personal clothing, and clean protective clothing and equipment to prevent cross-contamination;

(2) The change rooms or areas that are used to remove beryllium-contaminated clothing and protective equipment must be maintained under negative pressure or located so as to minimize dispersion of beryllium into clean areas; and

(c) Showers and handwashing facilities. (1) The responsible employer must provide handwashing and shower facilities for beryllium workers who work in regulated areas.

(2) The responsible employer must assure that beryllium workers who work in regulated areas shower at the end of the work shift.

(d) Lunchroom facilities. (1) The responsible employer must provide lunchroom facilities that are readily accessible to beryllium workers, and ensure that tables for eating are free of beryllium, and that no worker in a lunchroom facility is exposed at any time to beryllium at or above the action level.

(2) The responsible employer must assure that beryllium workers do not enter lunchroom facilities with protective work clothing or equipment unless the surface beryllium has been removed from clothing and equipment by HEPA vacuuming or other method that removes beryllium without dispersing it.

(e) The change rooms or areas, shower and handwashing facilities, and lunchroom facilities must comply with 29 CFR 1910.141, Sanitation.

§ 850.28 Respiratory protection.

(a) The responsible employer must establish a respiratory protection program that complies with the respiratory protection program requirements of 29 CFR 1910.134, Respiratory Protection.

(b) The responsible employer must provide respirators to, and ensure that they are used by, all workers who:

(1) Are exposed to an airborne concentration of beryllium at or above the action level, or

(2) Are performing tasks for which analyses indicate the potential for exposures at or above the action level.

(c) The responsible employer must include in the respiratory protection program any beryllium-associated worker who requests to use a respirator for protection against airborne beryllium, regardless of measured exposure levels.

(d) The responsible employer must select for use by workers:

(1) Respirators approved by the National Institute for Occupational Safety and Health (NIOSH) if NIOSH-approved respirators exist for a specific DOE task; or

(2) Respirators that DOE has accepted under the DOE Respiratory Protection Acceptance Program if NIOSH-approved respirators do not exist for specific DOE tasks.

§ 850.29 Protective clothing and equipment.

(a) The responsible employer must provide protective clothing and equipment to beryllium workers and ensure its appropriate use and maintenance, where dispersible forms of beryllium may contact worker's skin, enter openings in workers' skin, or contact workers' eyes, including where:

(1) Exposure monitoring has established that airborne concentrations of beryllium are at or above the action level;

(2) Surface contamination levels measured or presumed prior to initiating work are above the level prescribed in § 850.30;

(3) Surface contamination levels results obtained to confirm housekeeping efforts are above the level prescribed in § 850.30; and

(4) Any beryllium-associated worker who requests the use of protective clothing and equipment for protection against airborne beryllium, regardless of measured exposure levels.

(b) The responsible employer must comply with 29 CFR 1910.132, Personal Protective Equipment General Requirements, when workers use personal protective clothing and equipment.

(c) The responsible employer must establish procedures for donning, doffing, handling, and storing protective clothing and equipment that:

(1) Prevent beryllium workers from exiting areas that contain beryllium with contamination on their bodies or their personal clothing; and

(2) Include beryllium workers exchanging their personal clothing for full-body protective clothing and footwear before they begin work in regulated areas.

(d) The responsible employer must ensure that no worker removes beryllium-contaminated protective clothing and equipment from areas that contain beryllium, except for workers authorized to launder, clean, maintain, or dispose of the clothing and equipment.

(e) The responsible employer must prohibit the removal of beryllium from protective clothing and equipment by blowing, shaking, or other means that may disperse beryllium into the air.

(f) The responsible employer must ensure that protective clothing and equipment is cleaned, laundered, repaired, or replaced as needed to maintain effectiveness. The responsible employer must:

(1) Ensure that beryllium-contaminated protective clothing and equipment, when removed for laundering, cleaning, maintenance, or disposal, is placed in containers that prevent the dispersion of beryllium dust and that are labeled in accordance with § 850.38 of this part; and

(2) Inform organizations that launder or clean DOE beryllium-contaminated protective clothing or equipment that exposure to beryllium is potentially harmful, and that clothing and equipment should be laundered or cleaned in a manner prescribed by the responsible employer to prevent the release of airborne beryllium.

§ 850.30 Housekeeping.

(a) Where beryllium is present in operational areas of DOE facilities, the responsible employer must conduct routine surface sampling to determine housekeeping conditions. Surfaces contaminated with beryllium dusts and waste must not exceed a removable contamination level of 3 µg/100 cm 2 during non-operational periods. This sampling would not include the interior of installed closed systems such as enclosures, glove boxes, chambers, or ventilation systems.

(b) When cleaning floors and surfaces in areas where beryllium is present at DOE facilities, the responsible employer must clean beryllium-contaminated floors and surfaces using a wet method, vacuuming or other cleaning methods, such as sticky tack cloths, that avoid the production of airborne dust. Compressed air or dry methods must not be used for such cleaning.

(c) The responsible employer must equip the portable or mobile vacuum units that are used to clean beryllium-contaminated areas with HEPA filters, and change the filters as often as needed to maintain their capture efficiency.

(d) The responsible employer must ensure that the cleaning equipment that is used to clean beryllium-contaminated surfaces is labeled, controlled, and not used for non-hazardous materials.

§ 850.31 Release criteria.

(a) The responsible employer must clean beryllium-contaminated equipment and other items to the lowest contamination level practicable, but not to exceed the levels established in paragraphs (b) and (c) of this section, and label the equipment or other items, before releasing them to the general public or a DOE facility for non-beryllium use, or to another facility for work involving beryllium.

(b) Before releasing beryllium-contaminated equipment or other items to the general public or for use in a non-beryllium area of a DOE facility, the responsible employer must ensure that:

(1) The removable contamination level of equipment or item surfaces does not exceed the higher of 0.2 µg/100 cm 2 or the concentration level of beryllium in soil at the point or release, whichever is greater;

(2) The equipment or item is labeled in accordance with § 850.38(b); and

(3) The release is conditioned on the recipient's commitment to implement controls that will prevent foreseeable beryllium exposure, considering the nature of the equipment or item and its future use and the nature of the beryllium contamination.

(c) Before releasing beryllium-contaminated equipment or other items to another facility performing work with beryllium, the responsible employer must ensure that:

(1) The removable contamination level of equipment or item surfaces does not exceed 3 µg/100 cm 2;

(2) The equipment or item is labeled in accordance with § 850.38(b); and

(3) The equipment or item is enclosed or placed in sealed, impermeable bags or containers to prevent the release of beryllium dust during handling and transportation.

§ 850.32 Waste disposal.

(a) The responsible employer must control the generation of beryllium-containing waste, and beryllium-contaminated equipment and other items that are disposed of as waste, through the application of waste minimization principles.

(b) Beryllium-containing waste, and beryllium-contaminated equipment and other items that are disposed of as waste, must be disposed of in sealed, impermeable bags, containers, or enclosures to prevent the release of beryllium dust during handling and transportation. The bags, containers, and enclosures that are used for disposal of beryllium waste must be labeled according to § 850.38.

§ 850.33 Beryllium emergencies.

(a) The responsible employer must comply with 29 CFR 1910.120(l) for handling beryllium emergencies related to decontamination and decommissioning operations.

(b) The responsible employer must comply with 29 CFR 1910.120(q) for handling beryllium emergencies related to all other operations.

§ 850.34 Medical surveillance.

(a) General. (1) The responsible employer must establish and implement a medical surveillance program for beryllium-associated workers who voluntarily participate in the program.

(2) The responsible employer must designate a Site Occupational Medical Director (SOMD) who is responsible for administering the medical surveillance program.

(3) The responsible employer must ensure that the medical evaluations and procedures required by this section are performed by, or under the supervision of, a licensed physician who is familiar with the health effects of beryllium.

(4) The responsible employer must establish, and maintain, a list of beryllium-associated workers who may be eligible for protective measures under this part. The list must be:

(i) Based on the hazard assessment, exposure records, and other information regarding the identity of beryllium-associated workers; and

(ii) Adjusted at regular intervals based on periodic evaluations of beryllium-associated workers performed under paragraph (b)(2) of this section;

(5) The responsible employer must provide the SOMD with the information needed to operate and administer the medical surveillance program, including the:

(i) List of beryllium-associated workers required by paragraph (a)(4) of this section;

(ii) Baseline inventory;

(iii) Hazard assessment and exposure monitoring data;

(iv) Identity and nature of activities or operations on the site that are covered under the CBDPP, related duties of beryllium-associated workers; and

(v) Type of personal protective equipment used.

(6) The responsible employer must provide the following information to the SOMD and the examining physician:

(i) A copy of this rule and its preamble;

(ii) A description of the worker's duties as they pertain to beryllium exposure;

(iii) Records of the worker's beryllium exposure; and

(iv) A description of the personal protective and respiratory protective equipment used by the worker in the past, present, or anticipated future use.

(b) Medical evaluations and procedures. The responsible employer must provide, to beryllium-associated workers who voluntarily participate in the medical surveillance program, the medical evaluations and procedures required by this section at no cost and at a time and place that is reasonable and convenient to the worker.

(1) Baseline medical evaluation. The responsible employer must provide a baseline medical evaluation to beryllium-associated workers. This evaluation must include:

(i) A detailed medical and work history with emphasis on past, present, and anticipated future exposure to beryllium;

(ii) A respiratory symptoms questionnaire;

(iii) A physical examination with special emphasis on the respiratory system, skin and eyes;

(iv) A chest radiograph (posterior-anterior, 14 × 17 inches) interpreted by a National Institute for Occupational Safety and Health (NIOSH) B-reader of pneumoconiosis or a board-certified radiologist (unless a baseline chest radiograph is already on file);

(v) Spirometry consisting of forced vital capacity (FVC) and forced expiratory volume at 1 second (FEV1);

(vi) A Be-LPT; and

(vii) Any other tests deemed appropriate by the examining physician for evaluating beryllium-related health effects.

(2) Periodic evaluation. (i) The responsible employer must provide to beryllium workers a medical evaluation annually, and to other beryllium-associated workers a medical evaluation every three years. The periodic medical evaluation must include:

(A) A detailed medical and work history with emphasis on past, present, and anticipated future exposure to beryllium;

(B) A respiratory symptoms questionnaire;

(C) A physical examination with emphasis on the respiratory system;

(D) A Be-LPT; and

(E) Any other medical evaluations deemed appropriate by the examining physician for evaluating beryllium-related health effects.

(ii) The responsible employer must provide to beryllium-associated workers a chest radiograph every five years.

(3) Emergency evaluation. The responsible employer must provide a medical evaluation as soon as possible to any worker who may have been exposed to beryllium because of a beryllium emergency. The medical evaluation must include the requirements of paragraph (b)(2) of this section.

(c) Multiple physician review. The responsible employer must establish a multiple physician review process for beryllium-associated workers that allows for the review of initial medical findings, determinations, or recommendations from any medical evaluation conducted pursuant to paragraph (b) of this section.

(1) If the responsible employer selects the initial physician to conduct any medical examination or consultation provided to a beryllium-associated worker, the worker may designate a second physician to:

(i) Review any findings, determinations, or recommendations of the initial physician; and

(ii) Conduct such examinations, consultations and laboratory tests, as the second physician deems necessary to facilitate this review.

(2) The responsible employer must promptly notify a beryllium-associated worker in writing of the right to seek a second medical opinion after the initial physician provided by the responsible employer conducts a medical examination or consultation.

(3) The responsible employer may condition its participation in, and payment for, multiple physician review upon the beryllium-associated worker doing the following within fifteen (15) days after receipt of the notice, or receipt of the initial physician's written opinion, whichever is later:

(i) Informing the responsible employer in writing that he or she intends to seek a second medical opinion; and

(ii) Initiating steps to make an appointment with a second physician.

(4) If the findings, determinations, or recommendations of the second physician differ from those of the initial physician, then the responsible employer and the beryllium-associated worker must make efforts to encourage and assist the two physicians to resolve any disagreement.

(5) If, despite the efforts of the responsible employer and the beryllium-associated worker, the two physicians are unable to resolve their disagreement, then the responsible employer and the worker, through their respective physicians, must designate a third physician to:

(i) Review any findings, determinations, or recommendations of the other two physicians; and

(ii) Conduct such examinations, consultations, laboratory tests, and consultations with the other two physicians, as the third physician deems necessary to resolve the disagreement among them.

(6) The SOMD must act consistently with the findings, determinations, and recommendations of the third physician, unless the SOMD and the beryllium-associated worker reach an agreement that is consistent with the recommendations of at least one of the other two physicians.

(d) Alternate physician determination. The responsible employer and the beryllium-associated worker or the worker's designated representative may agree upon the use of any alternate form of physician determination in lieu of the multiple physician review process provided by paragraph (c) of this section, so long as the alternative is expeditious and at least as protective of the worker.

(e) Written medical opinion and recommendation. (1) Within two weeks of receipt of results, the SOMD must provide to the responsible employer a written, signed medical opinion for each medical evaluation performed on each beryllium-associated worker. The written opinion must take into account the findings, determinations and recommendations of the other examining physicians who may have examined the beryllium-associated worker. The SOMD's opinion must contain:

(i) The diagnosis of the worker's condition relevant to occupational exposure to beryllium, and any other medical condition that would place the worker at increased risk of material impairment to health from further exposure to beryllium;

(ii) Any recommendation for removal of the worker from DOE beryllium activities, or limitation on the worker's activities or duties or use of personal protective equipment, such as a respirator; and

(iii) A statement that the SOMD or examining physician has clearly explained to the worker the results of the medical evaluation, including all tests results and any medical condition related to beryllium exposure that requires further evaluation or treatment.

(2) The SOMD's written medical opinion must not reveal specific records, findings, and diagnoses that are not related to medical conditions that may be affected by beryllium exposure.

(f) Information provided to the beryllium-associated worker. (1) The SOMD must provide each beryllium-associated worker with a written medical opinion containing the results of all medical tests or procedures, an explanation of any abnormal findings, and any recommendation that the worker be referred for additional testing for evidence of CBD, within 10 working days after the SOMD's receipt of the results of the medical tests or procedures.

(2) The responsible employer must, within 30 days after a request by a beryllium-associated worker, provide the worker with the information the responsible employer is required to provide the examining physician under paragraph (a)(6) of this section.

(g) Reporting. The responsible employer must report on the applicable OSHA reporting form beryllium sensitization, CBD, or any other abnormal condition or disorder of workers caused or aggravated by occupational exposure to beryllium.

(h) Data analysis. (1) The responsible employer must routinely and systematically analyze medical, job, and exposure data with the aim of identifying individuals or groups of individuals potentially at risk for CBD and working conditions that are contributing to that risk.

(2) The responsible employer must use the results of these analyses to identify additional workers to whom the responsible employer must provide medical surveillance and to determine the need for additional exposure controls.

§ 850.35 Medical removal.

(a) Medical removal protection. The responsible employer must offer a beryllium-associated worker medical removal from exposure to beryllium if the SOMD determines in a written medical opinion that it is medically appropriate to remove the worker from such exposure. The SOMD's determination must be based on one or more positive Be-LPT results, chronic beryllium disease diagnosis, an examining physician's recommendation, or any other signs or symptoms that the SOMD deems medically sufficient to remove a worker.

(1) Temporary removal pending final medical determination. The responsible employer must offer a beryllium-associated worker temporary medical removal from exposure to beryllium on each occasion that the SOMD determines in a written medical opinion that the worker should be temporarily removed from such exposure pending a final medical determination of whether the worker should be removed permanently.

(i) In this section, “final medical determination” means the outcome of the multiple physician review process or the alternate medical determination process provided for in paragraphs (c) and (d) of § 850.34.

(ii) If a beryllium-associated worker is temporarily removed from beryllium exposure pursuant to this section, the responsible employer must transfer the worker to a comparable job for which the worker is qualified (or for which the worker can be trained in a short period) and where beryllium exposures are as low as possible, but in no event at or above the action level.

(iii) The responsible employer must maintain the beryllium-associated worker's total normal earnings, seniority, and other worker rights and benefits as if the worker had not been removed.

(iv) If there is no such job available, the responsible employer must provide to the beryllium-associated worker the medical removal protection benefits specified in paragraph (b)(2) of this section, until a job becomes available or for one year, whichever comes first.

(2) Permanent medical removal. (i) The responsible employer must offer a beryllium-associated worker permanent medical removal from exposure to beryllium if the SOMD determines in a written medical opinion that the worker should be permanently removed from exposure to beryllium.

(ii) If a beryllium-associated worker is removed permanently from beryllium exposure based on the SOMD's recommendation pursuant to this section, the responsible employer must provide the worker the medical removal protection benefits specified in paragraph (b) of this section.

(3) Worker consultation before temporary or permanent medical removal. If the SOMD determines that a beryllium-associated worker should be temporarily or permanently removed from exposure to beryllium, the SOMD must:

(i) Advise the beryllium-associated worker of the determination that medical removal is necessary to protect the worker's health;

(ii) Provide the beryllium-associated worker with a copy of this rule and its preamble, and any other information the SOMD deems necessary on the risks of continued exposure to beryllium and the benefits of removal;

(iii) Provide the beryllium-associated worker the opportunity to have any questions concerning medical removal answered; and

(iv) Obtain the beryllium-associated worker's signature acknowledging that the worker has been advised to accept medical removal from beryllium exposure as provided in this section, and has been provided with the information specified in this paragraph, on the benefits of removal and the risks of continued exposure to beryllium.

(4) Return to work after medical removal. (i) The responsible employer, subject to paragraph (a)(4)(ii) of this section, must not return a beryllium-associated worker who has been permanently removed under this section to the worker's former job status unless the SOMD first determines in a written medical opinion that continued medical removal is no longer necessary to protect the worker's health.

(ii) Not withstanding paragraph (a)(4) (i) of this section, if, in the SOMD's opinion, continued exposure to beryllium will not pose an increased risk to the beryllium-associated worker's health, and medical removal is an inappropriate remedy in the circumstances, the SOMD must fully discuss these matters with the worker and then, in a written determination, may authorize the responsible employer to return the worker to his or her former job status. Thereafter, the returned beryllium-associated worker must continue to be provided with medical surveillance under § 850.34 of this part.

(b) Medical removal protection benefits. (1) If a beryllium-associated worker has been permanently removed from beryllium exposure pursuant to paragraph (a)(2) of this section, the responsible employer must provide the beryllium-associated worker:

(i) The opportunity to transfer to another position which is available, or later becomes available, for which the beryllium-associated worker is qualified (or for which the worker can be trained in a short period) and where beryllium exposures are as low as possible, but in no event at or above the action level; or

(ii) If the beryllium-associated worker cannot be transferred to a comparable job where beryllium exposures are below the action level, a maximum of 2 years of permanent medical removal protection benefits (specified in paragraph (b)(2) of this section).

(2) If required by this section to provide medical removal protection benefits, the responsible employer must maintain the removed worker's total normal earnings, seniority and other worker rights and benefits, as though the worker had not been removed.

(3) If a removed beryllium-associated worker files a claim for workers' compensation payments for a beryllium-related disability, then the responsible employer must continue to provide medical removal protection benefits pending disposition of the claim. The responsible employer must receive no credit for the workers' compensation payments received by the worker for treatment related expenses.

(4) The responsible employer's obligation to provide medical removal protection benefits to a removed beryllium-associated worker is reduced to the extent that the worker receives compensation for earnings lost during the period of removal either from a publicly- or employer-funded compensation program, or from employment with another employer made possible by virtue of the worker's removal.

(5) For the purposes of this section, the requirement that a responsible employer provide medical removal protection benefits is not intended to expand upon, restrict, or change any rights to a specific job classification or position under the terms of an applicable collective bargaining agreement.

(6) The responsible employer may condition the provision of medical removal protection benefits upon the beryllium-associated worker's participation in medical surveillance provided in accordance with § 850.34 of this part.

§ 850.36 Medical consent.

(a) The responsible employer must provide each beryllium-associated worker with a summary of the medical surveillance program established in § 850.34 at least one week before the first medical evaluation or procedure or at any time requested by the worker. This summary must include:

(1) The type of data that will be collected in the medical surveillance program;

(2) How the data will be collected and maintained;

(3) The purpose for which the data will be used; and

(4) A description of how confidential data will be protected.

(b) Responsible employers must also provide each beryllium-associated worker with information on the benefits and risks of the medical tests and examinations available to the worker at least one week prior to any such examination or test, and an opportunity to have the worker's questions answered.

(c) The responsible employer must have the SOMD obtain a beryllium-associated worker's signature on the informed consent form found in Appendix A to this part, before performing medical evaluations or any tests.

§ 850.37 Training and counseling.

(a) The responsible employer must develop and implement a beryllium training program and ensure participation for:

(1) Beryllium-associated workers;

(2) All other individuals who work at a site where beryllium activities are conducted.

(b) The training provided for workers identified in paragraph (a)(1) of this section, must:

(1) Be in accordance with 29 CFR 1910.1200, Hazard Communication;

(2) Include the contents of the CBDPP; and

(3) Include potential health risks to beryllium worker family members and others who may come in contact with beryllium on beryllium workers or beryllium workers' personal clothing or other personal items as the result of a beryllium control failure at a DOE facility.

(c) The training provided for workers identified in paragraph (a)(2) of this section must consist of general awareness about beryllium hazards and controls.

(d) The responsible employer must provide the training required by this section before or at the time of initial assignment and at least every two years thereafter.

(e) The employer must provide retraining when the employer has reason to believe that a beryllium worker lacks the proficiency, knowledge, or understanding needed to work safely with beryllium, including at least the following situations:

(1) To address any new beryllium hazards resulting from a change to operations, procedures, or beryllium controls about which the beryllium worker was not previously trained; and

(2) If a beryllium worker's performance involving beryllium work indicates that the worker has not retained the requisite proficiency.

(f) The responsible employer must develop and implement a counseling program to assist beryllium-associated workers who are diagnosed by the SOMD to be sensitized to beryllium or to have CBD. This counseling program must include communicating with beryllium-associated workers concerning:

(1) The medical surveillance program provisions and procedures;

(2) Medical treatment options;

(3) Medical, psychological, and career counseling;

(4) Medical benefits;

(5) Administrative procedures and workers rights under applicable Workers' Compensation laws and regulations;

(6) Work practice procedures limiting beryllium-associated worker exposure to beryllium; and

(7) The risk of continued beryllium exposure after sensitization.

§ 850.38 Warning signs and labels.

(a) Warning signs. The responsible employer must post warning signs at each access point to a regulated area with the following information:

DANGER BERYLLIUM CAN CAUSE LUNG DAMAGE CANCER HAZARD AUTHORIZED PERSONNEL ONLY

(b) Warning labels. (1) The responsible employer must affix warning labels to all containers of beryllium, beryllium compounds, or beryllium-contaminated clothing, equipment, waste, scrap, or debris.

(2) Warning labels must contain the following information:

DANGER CONTAMINATED WITH BERYLLIUM DO NOT REMOVE DUST BY BLOWING OR SHAKING CANCER AND LUNG DISEASE HAZARD

(c) Warning signs and labels must be in accordance with 29 CFR 1910.1200, Hazard Communication.

§ 850.39 Recordkeeping and use of information.

(a) The responsible employer must establish and maintain accurate records of all beryllium inventory information, hazard assessments, exposure measurements, exposure controls, and medical surveillance.

(b) Heads of DOE Departmental Elements must:

(1) Designate all record series as required under this rule as agency records and, therefore, subject to all applicable agency records management and access laws; and

(2) Ensure that these record series are retained for a minimum of seventy-five years.

(c) The responsible employer must convey to DOE or its designee all record series required under this rule if the employer ceases to be involved in the CBDPP.

(d) The responsible employer must link data on workplace conditions and health outcomes in order to establish a basis for understanding the beryllium health risk.

(e) The responsible employer must ensure the confidentiality of all work-related records generated under this rule by ensuring that:

(1) All records that are transmitted to other parties do not contain names, social security numbers or any other variables, or combination of variables, that could be used to identify particular individuals; and

(2) Individual medical information generated by the CBDPP is:

(i) Either included as part of the worker's site medical records and maintained by the SOMD, or is maintained by another physician designated by the responsible employer;

(ii) Maintained separately from other records; and

(iii) Used or disclosed by the responsible employer only in conformance with any applicable requirements imposed by the Americans with Disabilities Act, the Privacy Act of 1974, the Freedom of Information Act, and any other applicable law.

(f) The responsible employer must maintain all records required by this part in current and accessible electronic systems, which include the ability readily to retrieve data in a format that maintains confidentiality.

(g) The responsible employer must transmit all records generated as required by this rule, in a format that protects the confidentiality of individuals, to the Director, Office of Environment, Health, Safety and Security on request.

(h) The responsible employer must semi-annually transmit to the Office of Domestic and International Health Studies, Office of Environment, Health, Safety and Security an electronic registry of beryllium-associated workers that protects confidentiality, and the registry must include, but is not limited to, a unique identifier, date of birth, gender, site, job history, medical screening test results, exposure measurements, and results of referrals for specialized medical evaluations.

[64 FR 68905, Dec. 8, 1999, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5008, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 850.40 Performance feedback.

(a) The responsible employer must conduct periodic analyses and assessments of monitoring activities, hazards, medical surveillance, exposure reduction and minimization, and occurrence reporting data.

(b) To ensure that information is available to maintain and improve all elements of the CBDPP continuously, the responsible employer must give results of periodic analyses and assessments to the line managers, planners, worker protection staff, workers, medical staff, and labor organizations representing beryllium-associated workers who request such information.

Appendix A to Part 850 Chronic Beryllium Disease Prevention Program Informed Consent Form

I, ______________ have carefully read and understand the attached information about the Be-LPT and other medical tests. I have had the opportunity to ask any questions that I may have had concerning these tests.

I understand that this program is voluntary and I am free to withdraw at any time from all or any part of the medical surveillance program. I understand that the tests are confidential, but not anonymous. I understand that if the results of any test suggest a health problem, the examining physician will discuss the matter with me, whether or not the result is related to my work with beryllium. I understand that my employer will be notified of my diagnosis only if I have a beryllium sensitization or chronic beryllium disease. My employer will not receive the results or diagnoses of any health conditions not related to beryllium exposure.

I understand that, if the results of one or more of these tests indicate that I have a health problem that is related to beryllium, additional examinations will be recommended. If additional tests indicate I do have a beryllium sensitization or CBD, the Site Occupational Medical Director may recommend that I be removed from working with beryllium. If I agree to be removed, I understand that I may be transferred to another job for which I am qualified (or can be trained for in a short period) and where my beryllium exposures will be as low as possible, but in no case above the action level. I will maintain my total normal earnings, seniority, and other benefits for up to two years if I agree to be permanently removed.

I understand that if I apply for another job or for insurance, I may be requested to release my medical records to a future employer or an insurance company.

I understand that my employer will maintain all medical information relative to the tests performed on me in segregated medical files separate from my personnel files, treated as confidential medical records, and used or disclosed only as provided by the Americans with Disability Act, the Privacy Act of 1974, or as required by a court order or under other law.

I understand that the results of my medical tests for beryllium will be included in the Beryllium Registry maintained by DOE, and that a unique identifier will be used to maintain the confidentiality of my medical information. Personal identifiers will not be included in any reports generated from the DOE Beryllium Registry. I understand that the results of my tests and examinations may be published in reports or presented at meetings, but that I will not be identified.

I consent to having the following medical evaluations:

/ / Physical examination concentrating on my lungs and breathing

/ / Chest X-ray

/ / Spirometry (a breathing test)

/ / Blood test called the beryllium-induced lymphocyte proliferation test or Be-LPT

/ / Other test(s). Specify:

Signature of Participant:

Date: ____________

I have explained and discussed any questions that the employee expressed concerning the Be-LPT, physical examination, and other medical testing as well as the implications of those tests.

Name of Examining Physician:

Signature of Examining Physician:

Dated: ____________

PART 851 WORKER SAFETY AND HEALTH PROGRAM

Authority: 42 U.S.C. 2201(i)(3), (p); 42 U.S.C. 2282c; 42 U.S.C. 5801 et seq.; 42 U.S.C. 7101 et seq.; 50 U.S.C. 2401 et seq.; 28 U.S.C. 2461 note.

Source: 71 FR 6931, Feb. 9, 2006, unless otherwise noted.

Editorial Note: Nomenclature changes to part 851 appear at 88 FR 41293, June 26, 2023.

Subpart A General Provisions

§ 851.1 Scope and purpose.

(a) The worker safety and health requirements in this part govern the conduct of contractor activities at DOE sites.

(b) This part establishes the:

(1) Requirements for a worker safety and health program that reduces or prevents occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites; and

(2) Procedures for investigating whether a violation of a requirement of this part has occurred, for determining the nature and extent of any such violation, and for imposing an appropriate remedy.

§ 851.2 Exclusions.

(a) This part does not apply to work at a DOE site:

(1) Regulated by the Occupational Safety and Health Administration; or

(2) Operated under the authority of the Director, Naval Nuclear Propulsion, pursuant to Executive Order 12344, as set forth in Public Law 98-525, 42 U.S.C. 7158 note.

(b) This part does not apply to radiological hazards or nuclear explosives operations to the extent regulated by 10 CFR Parts 20, 820, 830 or 835.

(c) This part does not apply to transportation to or from a DOE site.

(d) This part does not require compliance with any Occupational Safety and Health Administration requirements for beryllium or beryllium compounds except as provided in 10 CFR part 850, “Chronic Beryllium Disease Prevention Program.”

[71 FR 6931, Feb. 9, 2006, as amended at 80 FR 69566, Nov. 10, 2015; 88 FR 86815, Dec. 15, 2023]

§ 851.3 Definitions.

(a) As used in this part:

AEA means the Atomic Energy Act of 1954, 42 U.S.C. 2011 et seq.

Affected worker means a worker who would be affected by the granting or denial of a variance, or any authorized representative of the worker, such as a collective bargaining agent.

Closure facility means a facility that is non-operational and is, or is expected to be permanently closed and/or demolished, or title to which is expected to be transferred to another entity for reuse.

Closure facility hazard means a facility-related condition within a closure facility involving deviations from the technical requirements of § 851.23 of this part that would require costly and extensive structural/engineering modifications to be in compliance.

Cognizant Secretarial Officer means, with respect to a particular situation, the Assistant Secretary, Deputy Administrator, Program Office Director, or equivalent DOE official who has primary line management responsibility for a contractor, or any other official to whom the CSO delegates in writing a particular function under this part.

Compliance order means an order issued by the Secretary to a contractor that mandates a remedy, work stoppage, or other action to address a situation that violates, potentially violates, or otherwise is inconsistent with a requirement of this part.

Consent order means any written document, signed by the Enforcement Director and a contractor, containing stipulations or conclusions of fact or law and a remedy acceptable to both DOE and the contractor.

Construction means combination of erection, installation, assembly, demolition, or fabrication activities involved to create a new facility or to alter, add to, rehabilitate, dismantle, or remove an existing facility. It also includes the alteration and repair (including dredging, excavating, and painting) of buildings, structures, or other real property, as well as any construction, demolition, and excavation activities conducted as part of environmental restoration or remediation efforts.

Construction contractor means the lowest tiered contractor with primary responsibility for the execution of all construction work described within a construction procurement or authorization document (e.g., construction contract, work order).

Construction manager means the individual or firm responsible to DOE for the supervision and administration of a construction project to ensure the construction contractor's compliance with construction project requirements.

Construction project means the full scope of activities required on a construction worksite to fulfill the requirements of the construction procurement or authorization document.

Construction worksite is the area within the limits necessary to perform the work described in the construction procurement or authorization document. It includes the facility being constructed or renovated along with all necessary staging and storage areas as well as adjacent areas subject to project hazards.

Contractor means any entity, including affiliated entities, such as a parent corporation, under contract with DOE, or a subcontractor at any tier, that has responsibilities for performing work at a DOE site in furtherance of a DOE mission.

Covered workplace means a place at a DOE site where a contractor is responsible for performing work in furtherance of a DOE mission.

Director of the Office of Enforcement (Enforcement Director) means the DOE official designated by the Secretary, or that person's designee, to carry out the enforcement authorities reflected in subpart E of this part.

Director of the Office of Environment, Health, Safety and Security (EHSS Director) means the DOE official to whom the Secretary assigns the authority to develop policy and technical assistance; safety analysis; and organizational safety and security programs.

DOE means the United States Department of Energy, including the National Nuclear Security Administration.

DOE Enforcement Officer means a DOE official to whom the Enforcement Director assigns the authority to investigate the nature and extent of compliance with the requirements of this part.

DOE site means a DOE-owned or -leased area or location or other area or location controlled by DOE where activities and operations are performed at one or more facilities or places by a contractor in furtherance of a DOE mission.

Final notice of violation means a document that determines a contractor has violated or is continuing to violate a requirement of this part and includes:

(1) A statement specifying the requirement of this part to which the violation relates;

(2) A concise statement of the basis for the determination;

(3) Any remedy, including the amount of any civil penalty; and

(4) A statement explaining the reasoning behind any remedy.

Final Order means an order of DOE that represents final agency action and, if appropriate, imposes a remedy with which the recipient of the order must comply.

General Counsel means the General Counsel of DOE.

Head of DOE Field Element means an individual who is the manager or head of the DOE operations office or field office.

Interpretative ruling means a statement by the General Counsel concerning the meaning or effect of a requirement of this part which relates to a specific factual situation but may also be a ruling of general applicability if the General Counsel determines such action to be appropriate.

National defense variance means relief from a safety and health standard, or portion thereof, to avoid serious impairment of a national defense mission.

NNSA means the National Nuclear Security Administration.

Nuclear explosive means an assembly containing fissionable and/or fusionable materials and main charge high-explosive parts or propellants capable of producing a nuclear detonation (e.g., a nuclear weapon or test device).

Nuclear explosive operation means any activity involving a nuclear explosive, including activities in which main charge high-explosive parts and pit are collocated.

Occupational medicine provider means the designated site occupational medicine director (SOMD) or the individual providing medical services.

Permanent variance means relief from a safety and health standard, or portion thereof, to contractors who can prove that their methods, conditions, practices, operations, or processes provide workplaces that are as safe and healthful as those that follow the workplace safety and health standard required by this part.

Preliminary notice of violation means a document that sets forth the preliminary conclusions that a contractor has violated or is continuing to violate a requirement of this part and includes:

(1) A statement specifying the requirement of this part to which the violation relates;

(2) A concise statement of the basis for alleging the violation;

(3) Any remedy, including the amount of any proposed civil penalty; and

(4) A statement explaining the reasoning behind any proposed remedy.

Pressure systems means all pressure vessels, and pressure sources including cryogenics, pneumatic, hydraulic, and vacuum. Vacuum systems should be considered pressure systems due to their potential for catastrophic failure due to backfill pressurization. Associated hardware (e.g., gauges and regulators), fittings, piping, pumps, and pressure relief devices are also integral parts of the pressure system.

Remedy means any action (including, but not limited to, the assessment of civil penalties, the reduction of fees or other payments under a contract, the requirement of specific actions, or the modification, suspension or rescission of a contract) necessary or appropriate to rectify, prevent, or penalize a violation of a requirement of this part, including a compliance order issued by the Secretary pursuant to this part.

Safety and health standard means a standard that addresses a workplace hazard by establishing limits, requiring conditions, or prescribing the adoption or use of one or more practices, means, methods, operations, or processes, reasonably necessary or appropriate to provide safe and healthful workplaces.

Secretary means the Secretary of Energy.

Temporary variance means a short-term relief for a new safety and health standard when the contractor cannot comply with the requirements by the prescribed date because the necessary construction or alteration of the facility cannot be completed in time or when technical personnel, materials, or equipment are temporarily unavailable.

Unauthorized discharge means the discharge of a firearm under circumstances other than: (1) during firearms training with the firearm properly pointed down range (or toward a target), or (2) the intentional firing at hostile parties when deadly force is authorized.

Under Secretary means, with respect to a particular situation, the DOE official who serves as the Under Secretary for Science and Innovation, or Under Secretary for Infrastructure, or the Under Secretary for Nuclear Security/Administrator for National Nuclear Security Administration who has primary line management responsibility for a contractor.

Variance means an exception to compliance with some part of a safety and health standard granted by the Under Secretary to a contractor.

Worker means an employee of a DOE contractor person who performs work in furtherance of a DOE mission at a covered workplace.

Workplace hazard means a physical, chemical, biological, or safety hazard with any potential to cause illness, injury, or death to a person.

(b) Terms undefined in this part that are defined in the Atomic Energy Act of 1954 must have the same meaning as under that Act.

[71 FR 6931, Feb. 9, 2006, as amended at 80 FR 5008, Jan. 30, 2015; 88 FR 41293, June 26, 2023; 88 FR 86815, Dec. 15, 2023]

§ 851.4 Compliance order.

(a) The Secretary may issue to any contractor a Compliance Order that:

(1) Identifies a situation that violates, potentially violates, or otherwise is inconsistent with a requirement of this part;

(2) Mandates a remedy, work stoppage, or other action; and,

(3) States the reasons for the remedy, work stoppage, or other action.

(b) A Compliance Order is a final order that is effective immediately unless the Order specifies a different effective date.

(c) Within 15 calendar days of the issuance of a Compliance Order, the recipient of the Order may request the Secretary to rescind or modify the Order. A request does not stay the effectiveness of a Compliance Order unless the Secretary issues an order to that effect.

(d) A copy of the Compliance Order must be prominently posted, once issued, at or near the location where the violation, potential violation, or inconsistency occurred until it is corrected.

§ 851.5 Enforcement.

(a) A contractor that is indemnified under section 170d. of the AEA (or any subcontractor or supplier thereto) and that violates (or whose employee violates) any requirement of this part shall be subject to a civil penalty of up to $121,876 for each such violation. If any violation under this subsection is a continuing violation, each day of the violation shall constitute a separate violation for the purpose of computing the civil penalty.

(b) A contractor that violates any requirement of this part may be subject to a reduction in fees or other payments under a contract with DOE, pursuant to the contract's Conditional Payment of Fee clause, or other contract clause providing for such reductions.

(c) DOE may not penalize a contractor under both paragraphs (a) and (b) of this section for the same violation of a requirement of this part.

(d) For contractors listed in subsection d. of section 234A of the AEA, 42 U.S.C. 2282a(d), the total amount of civil penalties under paragraph (a) and contract penalties under paragraph (b) of this section may not exceed the total amount of fees paid by DOE to the contractor in that fiscal year.

(e) DOE shall not penalize a contractor under both sections 234A and 234C of the AEA for the same violation.

(f) DOE enforcement actions through civil penalties under paragraph (a) of this section, start on February 9, 2007.

[71 FR 6931, Feb. 9, 2006, as amended at 74 FR 66033, Dec. 14, 2009; 79 FR 20, Jan. 2, 2014; 81 FR 41795, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66084, Dec. 26, 2018; 85 FR 831, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2194, Jan. 13, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024]

§ 851.6 Petitions for generally applicable rulemaking.

(a) Right to file. Any person may file a petition for generally applicable rulemaking to amend or interpret provisions of this part.

(b) How to file. Any person who wants to file a petition for generally applicable rulemaking pursuant to this section must file by mail or messenger in an envelope addressed to the Office of General Counsel, GC-1, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585.

(c) Content of rulemaking petitions. A petition under this section must:

(1) Be labeled “Petition for Rulemaking Under 10 CFR 851;”

(2) Describe with particularity the provision of this part to be amended and the text of regulatory language to be added; and

(3) Explain why, if relevant, DOE should not choose to make policy by precedent through adjudication of petitions for assessment of civil penalty.

(d) Determinations upon rulemaking petitions. After considering the petition and other information DOE deems relevant, DOE may grant the petition and issue an appropriate rulemaking notice, or deny the petition because the rule being sought:

(1) Would be inconsistent with statutory law;

(2) Would establish a generally applicable policy in a subject matter area that should be left to case-by-case determinations; or

(3) For other good cause.

§ 851.7 Requests for a binding interpretive ruling.

(a) Right to file. Any person subject to this part shall have the right to file a request for an interpretive ruling that is binding on DOE with regard to a question as to how the regulations in this part would apply to particular facts and circumstances.

(b) How to file. Any person who wants to file a request under this section must file by mail or messenger in an envelope addressed to the Office of General Counsel, GC-1, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585.

(c) Content of request for interpretive ruling. A request under this section must:

(1) Be in writing;

(2) Be labeled “Request for Interpretive Ruling Under 10 CFR 851;”

(3) Identify the name, address, telephone number, e-mail address, and any designated representative of the person filing the request;

(4) State the facts and circumstances relevant to the request;

(5) Be accompanied by copies of relevant supporting documents if any;

(6) Specifically identify the pertinent regulations and the related question on which an interpretive ruling is sought; and

(7) Include explanatory discussion in support of the interpretive ruling being sought.

(d) Public comment. DOE may give public notice of any request for an interpretive ruling and provide an opportunity for public comment.

(e) Opportunity to respond to public comment. DOE may provide an opportunity to any person who requests an interpretive ruling to respond to public comments relating to the request.

(f) Other sources of information. DOE may:

(1) Conduct an investigation of any statement in a request;

(2) Consider any other source of information in evaluating a request for an interpretive ruling; and

(3) Rely on previously issued interpretive rulings with addressing the same or a related issue.

(g) Informal conference. DOE may convene an informal conference with the person requesting the interpretive ruling.

(h) Effect of interpretive ruling. Except as provided in paragraph (i) of this section, an interpretive ruling under this section is binding on DOE only with respect to the person who requested the ruling.

(i) Reliance on interpretive ruling. If DOE issues an interpretive ruling under this section, then DOE may not subject the person who requested the ruling to an enforcement action for civil penalties for actions reasonably taken in reliance on the ruling, but a person may not act in reliance on an interpretive ruling that is administratively rescinded or modified after opportunity to comment, judicially invalidated, or overruled by statute or regulation.

(j) Denial of requests for an interpretive ruling. DOE may deny a request for an interpretive ruling if DOE determines that:

(1) There is insufficient information upon which to base an interpretive ruling;

(2) The interpretive question posed should be treated in a general notice of proposed rulemaking;

(3) There is an adequate procedure elsewhere in this part for addressing the interpretive question such as a petition for variance; or

(4) For other good cause.

(k) Public availability of interpretive rulings. For information of interested members of the public, DOE may file a copy of interpretive rulings on a DOE internet web site.

[71 FR 6931, Feb. 9, 2006; 71 FR 36661, June 28, 2006, as amended at 88 FR 86815, Dec. 15, 2023]

§ 851.8 Informal requests for information.

(a) Any person may informally request information under this section as to how to comply with the requirements of this part, instead of applying for a binding interpretive ruling under § 851.7. DOE responses to informal requests for information under this section are not binding on DOE and do not preclude enforcement actions under this part.

(b) Inquiries regarding the technical requirements of the standards required by this part must be directed to the Office of Environment, Health, Safety and Security, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585.

(c) Information regarding the general statement of enforcement policy in the appendix to this part must be directed to the Office of Enterprise Assessments, Office of Enforcement, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585.

[71 FR 6931, Feb. 9, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015]

Subpart B Program Requirements

§ 851.10 General requirements.

(a) With respect to a covered workplace for which a contractor is responsible, the contractor must:

(1) Provide a place of employment that is free from recognized hazards that are causing or have the potential to cause death or serious physical harm to workers; and

(2) Ensure that work is performed in accordance with:

(i) All applicable requirements of this part; and

(ii) The worker safety and health program for that workplace.

(b) The written worker safety and health program must describe how the contractor complies with the:

(1) Requirements set forth in subpart C of this part that are applicable to the hazards associated with the contractor's scope of work; and

(2) Any compliance order issued by the Secretary pursuant to § 851.4.

[71 FR 6931, Feb. 9, 2006, as amended at 80 FR 5009, Jan. 30, 2015]

§ 851.11 Development and approval of worker safety and health program.

(a) Preparation and submission of worker safety and health program. By February 26, 2007, contractors must submit to the appropriate Head of DOE Field Element for approval a written worker safety and health program that provides the methods for implementing the requirements of subpart C of this part.

(1) If a contractor is responsible for more than one covered workplace at a DOE site, the contractor must establish and maintain a single worker safety and health program for the covered workplaces for which the contractor is responsible.

(2) If more than one contractor is responsible for covered workplaces, each contractor must:

(i) Establish and maintain a worker safety and health program for the workplaces for which the contractor is responsible; and

(ii) Coordinate with the other contractors responsible for work at the covered workplaces to ensure that there are clear roles, responsibilities and procedures to ensure the safety and health of workers at multi-contractor workplaces.

(3) The worker safety and health program must describe how the contractor will:

(i) Comply with the requirements set forth in subpart C of this part that are applicable to the covered workplace, including the methods for implementing those requirements; and

(ii) Integrate the requirements set forth in subpart C of this part that are applicable to a covered workplace with other related site-specific worker protection activities and with the integrated safety management system.

(b) DOE evaluation and approval. The Head of DOE Field Element must complete a review and provide written approval of the contractor's worker safety and health program, within 90 days of receiving the document. The worker safety and health program and any updates are deemed approved 90 days after submission if they are not specifically approved or rejected by DOE earlier.

(1) Beginning May 25, 2007, no work may be performed at a covered workplace unless an approved worker safety and health program is in place for the workplace.

(2) Contractors must send a copy of the approved program to the EHSS Director.

(3) Contractors must furnish a copy of the approved worker safety and health program, upon written request, to the affected workers or their designated representatives.

(c) Updates. (1) Contractors must submit an update of the worker safety and health program to the appropriate Head of DOE Field Element, for review and approval whenever a significant change or addition to the program is made, or a change in contractors occurs.

(2) Contractors must submit annually to DOE either an updated worker safety and health program for approval or a letter stating that no changes are necessary in the currently approved worker safety and health program.

(3) Contactors must incorporate in the worker safety and health program any changes, conditions, or workplace safety and health standards directed by DOE consistent with the requirements of this part and DEAR 970.5204-2, Laws, Regulations and DOE Directives (December, 2000) and associated contract clauses.

(d) Labor Organizations. If a contractor employs or supervises workers who are represented for collective bargaining by a labor organization, the contractor must:

(1) Give the labor organization timely notice of the development and implementation of the worker safety and health program and any updates thereto; and

(2) Upon timely request, bargain concerning implementation of this part, consistent with the Federal labor laws.

[71 FR 6931, Feb. 9, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 851.12 Implementation.

(a) Contractors must implement the requirements of this part.

(b) Nothing in this part precludes a contractor from taking any additional protective action that is determined to be necessary to protect the safety and health of workers.

§ 851.13 Compliance.

(a) Contractors must achieve compliance with all the requirements of Subpart C of this part, and their approved worker safety and health program no later than May 25, 2007. Contractors may be required to comply contractually with the requirements of this rule before February 9, 2007.

(b) In the event a contractor has established a written safety and health program, an Integrated Safety Management System (ISMS) description pursuant to the DEAR Clause, or an approved Work Smart Standards (WSS) process before the date of issuance of the final rule, the Contractor may use that program, description, or process as the worker safety and health program required by this part if the appropriate Head of the DOE Field Element approves such use on the basis of written documentation provided by the contractor that identifies the specific portions of the program, description, or process, including any additional requirements or implementation methods to be added to the existing program, description, or process, that satisfy the requirements of this part and that provide a workplace as safe and healthful as would be provided by the requirements of this part.

(c) Nothing in this part shall be construed to limit or otherwise affect contractual obligations of a contractor to comply with contractual requirements that are not inconsistent with the requirements of this part.

Subpart C Specific Program Requirements

§ 851.20 Management responsibilities and worker rights and responsibilities.

(a) Management responsibilities. Contractors are responsible for the safety and health of their workforce and must ensure that contractor management at a covered workplace:

(1) Establish written policy, goals, and objectives for the worker safety and health program;

(2) Use qualified worker safety and health staff (e.g., a certified industrial hygienist, or safety professional) to direct and manage the program;

(3) Assign worker safety and health program responsibilities, evaluate personnel performance, and hold personnel accountable for worker safety and health performance;

(4) Provide mechanisms to involve workers and their elected representatives in the development of the worker safety and health program goals, objectives, and performance measures and in the identification and control of hazards in the workplace;

(5) Provide workers with access to information relevant to the worker safety and health program;

(6) Establish procedures for workers to report without reprisal job-related fatalities, injuries, illnesses, incidents, and hazards and make recommendations about appropriate ways to control those hazards;

(7) Provide for prompt response to such reports and recommendations;

(8) Provide for regular communication with workers about workplace safety and health matters;

(9) Establish procedures to permit workers to stop work or decline to perform an assigned task because of a reasonable belief that the task poses an imminent risk of death, serious physical harm, or other serious hazard to workers, in circumstances where the workers believe there is insufficient time to utilize normal hazard reporting and abatement procedures; and

(10) Inform workers of their rights and responsibility by appropriate means, including posting the DOE-designated Worker Protection Poster in the workplace where it is accessible to all workers.

(b) Worker rights and responsibilities. Workers must comply with the requirements of this part, including the worker safety and health program, which are applicable to their own actions and conduct. Workers at a covered workplace have the right, without reprisal, to:

(1) Participate in activities described in this section on official time;

(2) Have access to:

(i) DOE safety and health publications;

(ii) The worker safety and health program for the covered workplace;

(iii) The standards, controls, and procedures applicable to the covered workplace;

(iv) The safety and health poster that informs the worker of relevant rights and responsibilities;

(v) Limited information on any recordkeeping log (OSHA Form 300). Access is subject to Freedom of Information Act requirements and restrictions; and

(vi) The DOE Form 5484.3 (the DOE equivalent to OSHA Form 301) that contains the employee's name as the injured or ill worker;

(3) Be notified when monitoring results indicate the worker was overexposed to hazardous materials;

(4) Observe monitoring or measuring of hazardous agents and have the results of their own exposure monitoring;

(5) Have a representative authorized by employees accompany the Enforcement Director or his authorized personnel during the physical inspection of the workplace for the purpose of aiding the inspection. When no authorized employee representative is available, the Enforcement Director or his authorized representative must consult, as appropriate, with employees on matters of worker safety and health;

(6) Request and receive results of inspections and accident investigations;

(7) Express concerns related to worker safety and health;

(8) Decline to perform an assigned task because of a reasonable belief that, under the circumstances, the task poses an imminent risk of death or serious physical harm to the worker coupled with a reasonable belief that there is insufficient time to seek effective redress through normal hazard reporting and abatement procedures; and

(9) Stop work when the worker discovers employee exposures to imminently dangerous conditions or other serious hazards; provided that any stop work authority must be exercised in a justifiable and responsible manner in accordance with procedures established in the approved worker safety and health program.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41293, June 26, 2023]

§ 851.21 Hazard identification and assessment.

(a) Contractors must establish procedures to identify existing and potential workplace hazards and assess the risk of associated workers injury and illness. Procedures must include methods to:

(1) Assess worker exposure to chemical, physical, biological, or safety workplace hazards through appropriate workplace monitoring;

(2) Document assessment for chemical, physical, biological, and safety workplace hazards using recognized exposure assessment and testing methodologies and using of accredited and certified laboratories;

(3) Record observations, testing and monitoring results;

(4) Analyze designs of new facilities and modifications to existing facilities and equipment for potential workplace hazards;

(5) Evaluate operations, procedures, and facilities to identify workplace hazards;

(6) Perform routine job activity-level hazard analyses;

(7) Review site safety and health experience information; and

(8) Consider interaction between workplace hazards and other hazards such as radiological hazards.

(b) Contractors must submit to the Head of DOE Field Element a list of closure facility hazards and the established controls within 90 days after identifying such hazards. The Head of DOE Field Element, with concurrence by the Cognizant Secretarial Officer, has 90 days to accept the closure facility hazard controls or direct additional actions to either:

(1) Achieve technical compliance; or

(2) Provide additional controls to protect the workers.

(c) Contractors must perform the activities identified in paragraph (a) of this section, initially to obtain baseline information and as often thereafter as necessary to ensure compliance with the requirements in this Subpart.

§ 851.22 Hazard prevention and abatement.

(a) Contractors must establish and implement a hazard prevention and abatement process to ensure that all identified and potential hazards are prevented or abated in a timely manner.

(1) For hazards identified either in the facility design or during the development of procedures, controls must be incorporated in the appropriate facility design or procedure.

(2) For existing hazards identified in the workplace, contractors must:

(i) Prioritize and implement abatement actions according to the risk to workers;

(ii) Implement interim protective measures pending final abatement; and

(iii) Protect workers from dangerous safety and health conditions;

(b) Contractors must select hazard controls based on the following hierarchy:

(1) Elimination or substitution of the hazards where feasible and appropriate;

(2) Engineering controls where feasible and appropriate;

(3) Work practices and administrative controls that limit worker exposures; and

(4) Personal protective equipment.

(c) Contractors must address hazards when selecting or purchasing equipment, products, and services.

§ 851.23 Safety and health standards.

(a) Contractors must comply with the following safety and health standards that are applicable to the hazards at their covered workplace:

(1) Title 10 Code of Federal Regulations (CFR) 850, “Chronic Beryllium Disease Prevention Program.”

(2) Title 29 CFR, part 1904, “Recording and Reporting Occupational Injuries and Illnesses”, §§ 1904.4 through 1904.11, 1904.29 through 1904.33, and 1904.46.

(3) Title 29 CFR, part 1910, “Occupational Safety and Health Standards,” excluding 29 CFR 1910.1096, “Ionizing Radiation”; 29 CFR 1910.1000, “Air Contaminants,” Tables Z-1 and Z-2, as they relate to beryllium and beryllium compounds; and 29 CFR 1910.1024, “Beryllium.”

(4) Title 29 CFR, part 1915, “Occupational Safety and Health Standards for Shipyard Employment,” except for 29 CFR 1915.1024, “Beryllium.”

(5) Title 29 CFR, Part 1917, “Marine Terminals.”

(6) Title 29 CFR, Part 1918, “Safety and Health Regulations for Longshoring.”

(7) Title 29 CFR, part 1926, “Safety and Health Regulations for Construction,” except for 29 CFR 1926.1124, “Beryllium.”

(8) Title 29 CFR, Part 1928, “Occupational Safety and Health Standards for Agriculture.”

(9) American Conference of Governmental Industrial Hygienists (ACGIH®), Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices, (2016) (incorporated by reference, see § 851.27), excluding the threshold limit values (TLVs®) for beryllium and beryllium compounds, when the ACGIH® TLVs® are lower (more protective) than permissible exposure limits in 29 CFR part 1910 for general industry, 29 CFR part 1915 for shipyards, and/or 29 CFR part 1926 for construction. When the ACGIH® TLVs® are used as exposure limits, contractors must comply with the other provisions of any applicable expanded health standard found in 29 CFR parts 1910, 1915, and 1926.

(10) American National Standards Institute (ANSI/ASSE) Z88.2, “American National Standard Practices for Respiratory Protection,” (2015) (incorporated by reference, see § 851.27).

(11) ANSI Z136.1, “Safe Use of Lasers,” (2014) (incorporated by reference, see § 851.27).

(12) ANSI Z49.1, “Safety in Welding, Cutting and Allied Processes,” sections 4.3 and E4.3 (2012) (incorporated by reference, see § 851.27).

(13) National Fire Protection Association (NFPA) 70, “National Electrical Code,” (2017) (incorporated by reference, see § 851.27).

(14) NFPA 70E, “Standard for Electrical Safety in the Workplace,” (2015) (incorporated by reference, see § 851.27).

(b) Nothing in this part relieves contractors from the responsibility to comply with any additional safety and health requirements that are necessary to protect the safety and health of workers.

[71 FR 6931, Feb. 9, 2006, as amended at 80 FR 69566, Nov. 10, 2015; 82 FR 59954, Dec. 18, 2017; 88 FR 86815, Dec. 15, 2023]

§ 851.24 Functional areas.

(a) Contractors must have a structured approach to their worker safety and health program which at a minimum, include provisions for the following applicable functional areas in their worker safety and health program: construction safety; fire protection; firearms safety; explosives safety; pressure safety; electrical safety; industrial hygiene; occupational medicine; biological safety; and motor vehicle safety.

(b) In implementing the structured approach required by paragraph (a) of this section, contractors must comply with the applicable standards and provisions in appendix A of this part, entitled “Worker Safety and Health Functional Areas.”

§ 851.25 Training and information.

(a) Contractors must develop and implement a worker safety and health training and information program to ensure that all workers exposed or potentially exposed to hazards are provided with the training and information on that hazard in order to perform their duties in a safe and healthful manner.

(b) The contractor must provide:

(1) Training and information for new workers, before or at the time of initial assignment to a job involving exposure to a hazard;

(2) Periodic training as often as necessary to ensure that workers are adequately trained and informed; and

(3) Additional training when safety and health information or a change in workplace conditions indicates that a new or increased hazard exists.

(c) Contractors must provide training and information to workers who have worker safety and health program responsibilities that is necessary for them to carry out those responsibilities.

§ 851.26 Recordkeeping and reporting.

(a) Recordkeeping. Contractors must:

(1) Establish and maintain complete and accurate records of all hazard inventory information, hazard assessments, exposure measurements, and exposure controls.

(2) Ensure that the work-related injuries and illnesses of its workers and subcontractor workers are recorded and reported accurately and consistent with DOE reporting directives.

(3) Comply with the applicable occupational injury and illness recordkeeping and reporting workplace safety and health standards in § 851.23 at their site, unless otherwise directed by DOE.

(4) Not conceal nor destroy any information concerning non-compliance or potential noncompliance with the requirements of this part.

(b) Reporting and investigation. Contractors must:

(1) Report and investigate accidents, injuries and illness; and

(2) Analyze related data for trends and lessons learned.

[71 FR 6931, Feb. 9, 2006, as amended at 82 FR 59954, Dec. 18, 2017]

§ 851.27 Materials incorporated by reference.

(a) Certain material is incorporated by reference into this subpart with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the U.S. Department of Energy (DOE) must publish a document in the Federal Register and the material must be available to the public. All approved incorporation by reference (IBR) material is available for inspection at DOE and at the National Archives and Records Administration (NARA). Contact DOE: the U.S. Department of Energy, Office of Environment, Health, Safety and Security, Office of Worker Safety and Health Policy, Mailstop EHSS-11, 1000 Independence Ave. SW, Washington, DC 20585; (301) 903-1165. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email: fr.inspection@nara.gov. The material may be obtained from the sources in the following paragraphs of this section.

(b) ACGIH®. American Conference of Governmental Industrial Hygienist, 1330 Kemper Meadow Drive, Cincinnati, OH 45240. Telephone number: 513-742-2020, or go to: http://www.acgih.org.

(1) ACGIH®, Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices, 2016; IBR approved for § 851.23.

(2) Reserved.

(c) ANSI. American National Standards Institute, 1899 L Street NW, 11th Floor, Washington, DC 20036. Telephone number: 202-293-8020, or go to: http://www.ansi.org.

(1) ANSI Z49.1-2012, American National Standard Safety in Welding, Cutting and Allied Processes, sections 4.3 and E4.3, ANSI approved March 9, 2012, IBR approved for § 851.23.

(2) ANSI/ASSE Z88.2-2015, American National Standard Practices for Respiratory Protection, ANSI approved March 4, 2015, IBR approved for § 851.23.

(3) ANSI Z136.1-2014, American National Standard for Safe Use of Lasers, ANSI approved December 10, 2013, IBR approved for § 851.23.

(d) ASME. American Society of Mechanical Engineers, P.O. Box 2300, Fairfield, NJ 07007. Telephone: 800-843-2763, or got to: http://www.asme.org.

(1) ASME Boilers and Pressure Vessel Codes (BPVC) as follows:

(i) BPVC.I-2015, Section I—Rules for Construction of Power Boilers, 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(ii) BPVC.II.A-2015, Section II—Materials, Part A—Ferrous Material Specifications (Beginning to SA-450), 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(iii) BPVC.II.A-2015, Section II—Materials, Part A—Ferrous Material Specifications (SA-451 to End), 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(iv) BPVC.II.B-2015, Section II—Materials, Part B—Nonferrous Material Specifications, 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(v) BPVC.II.C-2015, Section II—Materials, Part C—Specification for Welding Rods; Electrodes, and Filler Metals; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(vi) BPVC.II.D.C-2015, Section II—Materials, Part D—Properties (Customary); 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety

(vii) BPVC.II.D.M-2015, Section II—Materials, Part D—Properties (Metric); 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(viii) BPVC.III.A-2015, Section III—Rules for Construction of Nuclear Facility Components, Appendices; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(ix) BPVC.III.1.NB-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NB, Class 1 Components; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(x) BPVC.III.1.NC-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NC, Class 2 Components; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xi) BPVC.III.1.ND-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection ND, Class 3 Components; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xii) BPVC.III.1.NE-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NE, Class MC Components; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xiii) BPVC.III.1.NF-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NF, Supports; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xiv) BPVC.III.1.NG-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NG, Core Support Structures; 2015 edition, issued July 1 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xv) BPVC.III.1.NH-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NH, Class 1 Components in Elevated Temperature Service; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xvi) BPVC.III.NCA-2015, Section III—Rules for Construction of Nuclear Facility; Components, Subsection NCA, General Requirements for Division 1 and Division 2; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xvii) BPVC.III.2-2015, Section III—Rules for Construction of Nuclear Facility Components, Division 2, Code for Concrete Containments; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xviii) BPVC.III.3-2015, Section III—Rules for Construction of Nuclear Facility Components, Division 3, Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xix)) BPVC.III.5-2015, Section III—Rules for Construction of Nuclear Facility Components, Division 5, High Temperature Reactors; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xx) BPVC.IV-2015, Section IV, Rules for Construction of Heating Boilers; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxi) BPVC.V-2015, Section V, Nondestructive Examination; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxii) BPVC.VI-2015, Section VI, Recommended Rules for the Care and Operation of Heating Boilers; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxiii) BPVC.VII-2015, Section VII, Recommended Guidelines for the Care of Power Boilers; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxiv) BPVC.VIII.1-2015, Section VIII—Rules for Construction of Pressure Vessels, Division 1; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxv) BPVC.VIII.2-2015, Section VIII—Rules for Construction of Pressure Vessels, Division 2, Alternative Rules; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxvi) BPVC.VIII.3-2015, Section VIII—Rules for Construction of Pressure Vessels, Division 3, Alternative Rules for Construction of High Pressure Vessels; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxvii) BPVC.IX-2015, Section IX—Welding, Brazing and Fusing Qualifications, Qualification Standard for Welding, Brazing, and Fusing Procedures; Welders; Brazers; and Welding, Brazing, and Fusing Operators; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxviii) BPVC.X-2015, Section X, Fiber—Reinforced Plastic Pressure Vessels; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxix) BPVC.XI-2015, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxx) BPVC.XII-2015, Section XII, Rules for Construction and Continued Service of Transport Tanks; issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety;

(xxxi) BPVC.CC.BPV-2015, Code Cases, Boilers and Pressure Vessels; 2015 edition, issued July 1, 2015; IBR approved for appendix A, section 4, Pressure Safety; and

(xxxii) BPVC.CC.NC-2015, Code Cases, Nuclear Components; issued July 1, 2015, IBR approved for appendix A, section 4, Pressure Safety.

(2) ASME B31 codes for pressure piping as follows:

(i) B31.1-2016, Power Piping, ASME Code for Pressure Piping, B31, issued June 30, 2016; IBR approved for appendix A, Section 4, Pressure Safety;

(ii) B31.3-2014, Process Piping, ASME Code for Pressure Piping, B31, issued February 27, 2015; IBR approved for appendix A, Section 4, Pressure Safety;

(iii) B31.4-2016, Pipeline Transportation Systems for Liquids and Slurries, ASME Code for Pressure Piping, B31, issued March 31, 2016; IBR approved for appendix A, Section 4, Pressure Safety;

(iv) B31.5-2016, Refrigeration Piping and Heat Transfer Components, ASME Code for Pressure Piping, B31, issued June 29, 2016; IBR approved for appendix A, Section 4, Pressure Safety;

(v) B31.8-2016, Gas Transmission and Distribution Piping Systems, ASME Code for Pressure Piping, B31, issued September 30, 2014; IBR approved for appendix A, Section 4, Pressure Safety;

(vi) B31.8S-2014, Managing System Integrity of Gas Pipelines, ASME Code for Pressure Piping, B31, Supplement to ASME B31.8, issued September 30, 2014; IBR approved for appendix A, Section 4, Pressure Safety;

(vii) B31.9-2014, Building Services Piping, ASME Code for Pressure Piping, B31, issued April 28, 2014; IBR approved for appendix A, Section 4, Pressure Safety; and

(viii) B31G-2012, Manual for Determining the Remaining Strength of Corroded Pipelines, Supplement to ASME B31 Code for Pressure Piping, issued October 24, 2012; IBR approved for appendix A, Section 4, Pressure Safety.

(e) NFPA. The National Fire Protection Association, One Batterymarch Park, Quincy, MA 02169. Telephone: 617-984-7423, or go to: http://www.nfpa.org.

(1) NFPA 70, National Electric Code, (2017), issued August 4, 2016; IBR approved for § 851.23; and

(2) NFPA 70E, Standard for Electrical Safety in the Workplace, (2015 edition), issued July 14, 2014; IBR approved for § 851.23.

[82 FR 59954, Dec. 18, 2017, as amended at 88 FR 86815, Dec. 15, 2023]

Subpart D Variances

§ 851.30 Consideration of variances.

(a) Variances shall be granted by the Under Secretary after considering the recommendation of the EHSS Director. The authority to grant a variance cannot be delegated.

(b) The application must satisfy the requirements for applications specified in § 851.31.

[71 FR 6931, Feb. 9, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 851.31 Variance process.

(a) Application. Contractors desiring a variance from a safety and health standard, or portion thereof, may submit a written application containing the information in paragraphs (c) and (d) of this section to the appropriate CSO.

(1) The CSO may forward the application to the EHSS Director.

(2) If the CSO does not forward the application to the EHSS Director, the CSO must return the application to the contractor with a written statement explaining why the application was not forwarded.

(3) Upon receipt of an application from a CSO, the EHSS Director must review the application for a variance and make a written recommendation to:

(i) Approve the application;

(ii) Approve the application with conditions; or

(iii) Deny the application.

(b) Defective applications. If an application submitted pursuant to § 851.31(a) is determined by the EHSS Director to be incomplete, the EHSS Director may:

(1) Return the application to the contractor with a written explanation of what information is needed to permit consideration of the application; or

(2) Request the contractor to provide necessary information.

(c) Content. All variance applications submitted pursuant to paragraph (a) of this section must include:

(1) The name and address of the contractor;

(2) The address of the DOE site or sites involved;

(3) A specification of the standard, or portion thereof, from which the contractor seeks a variance;

(4) A description of the steps that the contractor has taken to inform the affected workers of the application, which must include giving a copy thereof to their authorized representative, posting a statement, giving a summary of the application and specifying where a copy may be examined at the place or places where notices to workers are normally posted; and

(5) A description of how affected workers have been informed of their right to petition the EHSS Director or designee for a conference; and

(6) Any requests for a conference, as provided in § 851.34.

(d) Types of variances. Contractors may apply for the following types of variances:

(1) Temporary variance. Applications for a temporary variance pursuant to paragraph (a) of this section must be submitted at least 30 days before the effective date of a new safety and health standard and, in addition to the content required by paragraph (c) of this section, must include:

(i) A statement by the contractor explaining the contractor is unable to comply with the standard or portion thereof by its effective date and a detailed statement of the factual basis and representations of qualified persons that support the contractor's statement;

(ii) A statement of the steps the contractor has taken and plans to take, with specific dates if appropriate, to protect workers against the hazard covered by the standard;

(iii) A statement of when the contractor expects to be able to comply with the standard and of what steps the contractor has taken and plans to take, with specific dates if appropriate, to come into compliance with the standard;

(iv) A statement of the facts the contractor would show to establish that:

(A) The contractor is unable to comply with the standard by its effective date because of unavailability of professional or technical personnel or materials and equipment needed to come into compliance with the standard or because necessary construction or alteration of facilities cannot be completed by the effective date;

(B) The contractor is taking all available steps to safeguard the workers against the hazards covered by the standard; and

(C) The contractor has an effective program for coming into compliance with the standard as quickly as practicable.

(2) Permanent variance. An application submitted for a permanent variance pursuant to paragraph (a) of this section must, in addition to the content required in paragraph (c) of this section, include:

(i) A description of the conditions, practices, means, methods, operations, or processes used or proposed to be used by the contractor; and

(ii) A statement showing how the conditions, practices, means, methods, operations, or processes used or proposed to be used would provide workers a place of employment which is as safe and healthful as would result from compliance with the standard from which a variance is sought.

(3) National defense variance. (i) An application submitted for a national defense variance pursuant to paragraph (a) of this section must, in addition to the content required in paragraph (c) of this section, include:

(A) A statement by the contractor showing that the variance sought is necessary to avoid serious impairment of national defense; and

(B) A statement showing how the conditions, practices, means, methods, operations, or processes used or proposed to be used would provide workers a safe and healthful place of employment in a manner that, to the extent practical taking into account the national defense mission, is consistent with the standard from which a variance is sought.

(ii) A national defense variance may be granted for a maximum of six months, unless there is a showing that a longer period is essential to carrying out a national defense mission.

[71 FR 6931, Feb. 9, 2006; 71 FR 36661, June 28, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 851.32 Action on variance requests.

(a) Procedures for an approval recommendation. (1) If the EHSS Director recommends approval of a variance application, the EHSS Director must forward to the Under Secretary the variance application and the approval recommendation including a discussion of the basis for the recommendation and any terms and conditions proposed for inclusion as part of the approval.

(2) If the Under Secretary approves a variance, the Under Secretary must notify the EHSS Director who must notify the Office of Enforcement and the CSO who must promptly notify the contractor.

(3) The notification must include a reference to the safety and health standard or portion thereof that is the subject of the application, a detailed description of the variance, the basis for the approval and any terms and conditions of the approval.

(4) If the Under Secretary denies a variance, the Under Secretary must notify the EHSS Director who must notify the appropriate CSO who must notify the contractor.

(5) The notification must include the grounds for denial.

(b) Approval criteria. A variance may be granted if the variance:

(1) Is consistent with section 3173 of the NDAA;

(2) Does not present an undue risk to worker safety and health;

(3) Is warranted under the circumstances;

(4) Satisfies the requirements of § 851.31 of this part for the type of variance requested.

(c) Procedures for a denial recommendation. (1) If the EHSS Director recommends denial of a variance application, the EHSS Director must notify the CSO of the denial recommendation and the grounds for the denial recommendation.

(2) Upon receipt of a denial recommendation, the CSO may:

(i) Notify the contractor that the variance application is denied on the grounds cited by the EHSS Director; or

(ii) Forward to the Under Secretary the variance application, the denial recommendation, the grounds for the denial recommendation, and any information that supports an action different than that recommended by the EHSS Director.

(3) If the CSO forwards the application to the Under Secretary, the procedures in paragraphs (a)(2), (3), (4) and (5) of this section apply.

(4) A denial of an application pursuant to this section shall be without prejudice to submitting of another application

(d) Grounds for denial of a variance. A variance may be denied if:

(1) Enforcement of the violation would be handled as a de minimis violation (defined as a deviation from the requirement of a standard that has no direct or immediate relationship to safety or health, and no enforcement action will be taken);

(2) When a variance is not necessary for the conditions, practice, means, methods, operations, or processes used or proposed to be used by contractor;

(3) Contractor does not demonstrate that the approval criteria are met.

[71 FR 6931, Feb. 9, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015; 88 FR 41293, June 26, 2023]

§ 851.33 Terms and conditions.

A variance may contain appropriate terms and conditions including, but not limited to, provisions that:

(a) Limit its duration;

(b) Require alternative action;

(c) Require partial compliance; and

(d) Establish a schedule for full or partial compliance.

§ 851.34 Requests for conferences.

(a) Within the time allotted by a notice of the filling of an application, any affected contractor or worker may file with the EHSS Director a request for a conference on the application for a variance.

(b) A request for a conference filed pursuant to paragraph (a) of this section must include:

(1) A concise statement explaining how the contractor or worker would be affected by the variance applied for, including relevant facts;

(2) A specification of any statement or representation in the application which is denied, and a concise summary of the evidence that would be adduced in support of each denial; and

(3) Any other views or arguments on any issue of fact or law presented.

(c) The EHSS Director, or designee, must respond to a request within fifteen days and, if the request is granted, indicate the time and place of the conference and the DOE participants in the conference.

[71 FR 6931, Feb. 9, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015; 88 FR 41294, June 26, 2023]

Subpart E Enforcement Process

§ 851.40 Investigations and inspections.

(a) The Enforcement Director may initiate and conduct investigations and inspections relating to the scope, nature, and extent of compliance by a contractor with the requirements of this part and take such action as the Enforcement Director deems necessary and appropriate to the conduct of the investigation or inspection. DOE Enforcement Officers have the right to enter work areas without delay to the extent practicable, to conduct inspections under this subpart.

(b) Contractors must fully cooperate with the Enforcement Director during all phases of the enforcement process and provide complete and accurate records and documentation as requested by the Enforcement Director during investigation or inspection activities.

(c) Any worker or worker representative may request that the Enforcement Director initiate an investigation or inspection pursuant to paragraph (a) of this section. A request for an investigation or inspection must describe the subject matter or activity to be investigated or inspected as fully as possible and include supporting documentation and information. The worker or worker representative has the right to remain anonymous upon filing a request for an investigation or inspection.

(d) The Enforcement Director must inform any contractor that is the subject of an investigation or inspection in writing at the initiation of the investigation or inspection and must inform the contractor of the general purpose of the investigation or inspection.

(e) DOE shall not disclose information or documents that are obtained during any investigation or inspection unless the Enforcement Director directs or authorizes the public disclosure of the investigation. Prior to such authorization, DOE must determine that disclosure is not precluded by the Freedom of Information Act, 5 U.S.C. 552 and part 1004 of this title. Once disclosed pursuant to the Enforcement Director's authorization, the information or documents are a matter of public record.

(f) A request for confidential treatment of information for purposes of the Freedom of Information Act does not prevent disclosure by the Enforcement Director if the Enforcement Director determines disclosure to be in the public interest and otherwise permitted or required by law.

(g) During the course of an investigation or inspection, any contractor may submit any document, statement of facts, or memorandum of law for the purpose of explaining the contractor's position or furnish information which the contractor considers relevant to a matter or activity under investigation or inspection.

(h) The Enforcement Director may convene an informal conference to discuss any situation that might be a violation of a requirement of this part, its significance and cause, any corrective action taken or not taken by the contractor, any mitigating or aggravating circumstances, and any other information. A conference is not normally open to the public and DOE does not make a transcript of the conference. The Enforcement Director may compel a contractor to attend the conference.

(i) If facts disclosed by an investigation or inspection indicate that further action is unnecessary or unwarranted, the Enforcement Director may close the investigation without prejudice.

(j) The Enforcement Director may issue enforcement letters that communicate DOE's expectations with respect to any aspect of the requirements of this part, including identification and reporting of issues, corrective actions, and implementation of the contractor's safety and health program; provided that an enforcement letter may not create the basis for any legally enforceable requirement pursuant to this part.

(k) The Enforcement Director may sign, issue and serve subpoenas.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41294, June 26, 2023]

§ 851.41 Settlement.

(a) DOE encourages settlement of a proceeding under this subpart at any time if the settlement is consistent with this part. The Enforcement Director and a contractor may confer at any time concerning settlement. A settlement conference is not open to the public and DOE does not make a transcript of the conference.

(b) Notwithstanding any other provision of this part, the Enforcement Director may resolve any issues in an outstanding proceeding under this subpart with a consent order.

(1) The Enforcement Director and the contractor, or a duly authorized representative thereto, must sign the consent order and indicate agreement to the terms contained therein.

(2) A contractor is not required to admit in a consent order that a requirement of this part has been violated.

(3) DOE is not required to make a finding in a consent order that a contractor has violated a requirement of this part.

(4) A consent order must set forth the relevant facts that form the basis for the order and what remedy, if any, is imposed.

(5) A consent order shall constitute a final order.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41294, June 26, 2023]

§ 851.42 Preliminary notice of violation.

(a) Based on a determination by the Enforcement Director that there is a reasonable basis to believe a contractor has violated or is continuing to violate a requirement of this part, the Enforcement Director may issue a preliminary notice of violation (PNOV) to the contractor.

(b) A PNOV must indicate:

(1) The date, facts, and nature of each act or omission upon which each alleged violation is based;

(2) The particular requirement involved in each alleged violation;

(3) The proposed remedy for each alleged violation, including the amount of any civil penalty; and

(4) The obligation of the contractor to submit a written reply to the Enforcement Director within 30 calendar days of receipt of the PNOV.

(c) A reply to a PNOV must contain a statement of all relevant facts pertaining to an alleged violation.

(1) The reply must:

(i) State any facts, explanations and arguments that support a denial of the alleged violation;

(ii) Demonstrate any extenuating circumstances or other reason why a proposed remedy should not be imposed or should be mitigated;

(iii) Discuss the relevant authorities that support the position asserted, including rulings, regulations, interpretations, and previous decisions issued by DOE; and

(iv) Furnish full and complete answers to any questions set forth in the preliminary notice.

(2) Copies of all relevant documents must be submitted with the reply.

(d) If a contractor fails to submit a written reply within 30 calendar days of receipt of a PNOV:

(1) The contractor relinquishes any right to appeal any matter in the preliminary notice; and

(2) The preliminary notice, including any proposed remedies therein, constitutes a final order.

(e) A copy of the PNOV must be prominently posted, once final, at or near the location where the violation occurred until the violation is corrected.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41294, June 26, 2023]

§ 851.43 Final notice of violation.

(a) If a contractor submits a written reply within 30 calendar days of receipt of a preliminary notice of violation (PNOV), that presents a disagreement with any aspect of the PNOV and civil penalty, the Enforcement Director must review the submitted reply and make a final determination whether the contractor violated or is continuing to violate a requirement of this part.

(b) Based on a determination by the Enforcement Director that a contractor has violated or is continuing to violate a requirement of this part, the Enforcement Director may issue to the contractor a final notice of violation that states concisely the determined violation and any remedy, including the amount of any civil penalty imposed on the contractor. The final notice of violation must state that the contractor may petition the Office of Hearings and Appeals for review of the final notice in accordance with 10 CFR part 1003.

(c) If a contractor fails to submit a petition for review to the Office of Hearings and Appeals within 30 calendar days of receipt of a final notice of violation pursuant to § 851.42:

(1) The contractor relinquishes any right to appeal any matter in the final notice; and

(2) The final notice, including any remedies therein, constitutes a final order.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41294, June 26, 2023]

§ 851.44 Administrative appeal.

(a) Any contractor that receives a final notice of violation may petition the Office of Hearings and Appeals for review of the final notice in accordance with 10 CFR part 1003, within 30 calendar days from receipt of the final notice.

(b) In order to exhaust administrative remedies with respect to a final notice of violation, the contractor must petition the Office of Hearings and Appeals for review in accordance with paragraph (a) of this section.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41294, June 26, 2023]

§ 851.45 Direction to NNSA contractors.

(a) Notwithstanding any other provision of this part, the NNSA Administrator, rather than the Enforcement Director, signs, issues and serves the following actions that direct NNSA contractors:

(1) Subpoenas;

(2) Orders to compel attendance;

(3) Disclosures of information or documents obtained during an investigation or inspection;

(4) Preliminary notices of violations; and

(5) Final notices of violations.

(b) The NNSA Administrator shall act after consideration of the Enforcement Director's recommendation.

[71 FR 6931, Feb. 9, 2006, as amended at 88 FR 41294, June 26, 2023]

Appendix A to Part 851 Worker Safety and Health Functional Areas

This appendix establishes the mandatory requirements for implementing the applicable functional areas required by § 851.24.

1. Construction Safety

(a) For each separately definable construction activity (e.g., excavations, foundations, structural steel, roofing) the construction contractor must:

(1) Prepare and have approved by the construction manager an activity hazard analysis prior to commencement of affected work. Such analyses must:

(i) Identify foreseeable hazards and planned protective measures;

(ii) Address further hazards revealed by supplemental site information (e.g., site characterization data, as-built drawings) provided by the construction manager;

(iii) Provide drawings and/or other documentation of protective measures for which applicable Occupational Safety and Health Administration (OSHA) standards require preparation by a Professional Engineer or other qualified professional, and

(iv) Identify competent persons required for workplace inspections of the construction activity, where required by OSHA standards.

(2) Ensure workers are aware of foreseeable hazards and the protective measures described within the activity analysis prior to beginning work on the affected activity.

(3) Require that workers acknowledge being informed of the hazards and protective measures associated with assigned work activities. Those workers failing to utilize appropriate protective measures must be subject to the construction contractor's disciplinary process.

(b) During periods of active construction (i.e., excluding weekends, weather delays, or other periods of work inactivity), the construction contractor must have a designated representative on the construction worksite who is knowledgeable of the project's hazards and has full authority to act on behalf of the construction contractor. The contractor's designated representative must make frequent and regular inspections of the construction worksite to identify and correct any instances of noncompliance with project safety and health requirements.

(c) Workers must be instructed to report to the construction contractor's designated representative, hazards not previously identified or evaluated. If immediate corrective action is not possible or the hazard falls outside of project scope, the construction contractor must immediately notify affected workers, post appropriate warning signs, implement needed interim control measures, and notify the construction manager of the action taken. The contractor or the designated representative must stop work in the affected area until appropriate protective measures are established.

(d) The construction contractor must prepare a written construction project safety and health plan to implement the requirements of this section and obtain approval of the plan by the construction manager prior to commencement of any work covered by the plan. In the plan, the contractor must designate the individual(s) responsible for on-site implementation of the plan, specify qualifications for those individuals, and provide a list of those project activities for which subsequent hazard analyses are to be performed. The level of detail within the construction project safety and health plan should be commensurate with the size, complexity and risk level of the construction project. The content of this plan need not duplicate those provisions that were previously submitted and approved as required by § 851.11.

2. Fire Protection

(a) Contractors must implement a comprehensive fire safety and emergency response program to protect workers commensurate with the nature of the work that is performed. This includes appropriate facility and site-wide fire protection, fire alarm notification and egress features, and access to a fully staffed, trained, and equipped emergency response organization that is capable of responding in a timely and effective manner to site emergencies.

(b) An acceptable fire protection program must include those fire protection criteria and procedures, analyses, hardware and systems, apparatus and equipment, and personnel that would comprehensively ensure that the objective in paragraph 2(a) of this section is met. This includes meeting applicable building codes and National Fire Protection Association codes and standards.

3. Explosives Safety

(a) Contractors responsible for the use of explosive materials must establish and implement a comprehensive explosives safety program.

(b) Contractors must comply with the policy and requirements specified in the appropriate explosives safety technical standard.

(c) Contractors must determine the applicability of the explosives safety directive requirements to research and development laboratory type operations consistent with the DOE level of protection criteria described in the explosives safety directive.

4. Pressure Safety

(a) Contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained and qualified personnel in accordance with applicable and sound engineering principles.

(b) Contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to:

(1) The applicable American Society of Mechanical Engineers (ASME) boilers and pressure vessel codes (BPVC), including applicable code cases as indicated in paragraphs (b)(1)(i) through (xxxii) of this section:

(i) BPVC.I-2015, Section I—Rules for Construction of Power Boilers (incorporated by reference, see § 851.27);

(ii) BPVC.II.A-2015, Section II-Materials, Part A—Ferrous Material Specifications (Beginning to SA-450) (incorporated by reference, see § 851.27);

(iii) BPVC.II.A-2015, Section II—Materials, Part A—Ferrous Material Specifications (SA-451 to End) (incorporated by reference, see § 851.27);

(iv) BPVC.II.B-2015, Section II—Materials, Part B—Nonferrous Material Specifications (incorporated by reference, see § 851.27);

(v) BPVC.II.C-2015, Section II—Materials, Part C-Specification for Welding Rods; Electrodes, and Filler Metals (incorporated by reference, see § 851.27);

(vi) BPVC.II.D.C-2015, Section II—Materials, Part D—Properties (Customary) (incorporated by reference, see § 851.27);

(vii) BPVC.II.D.M-2015, Section II—Materials, Part D—Properties (Metric) (incorporated by reference, see § 851.27);

(viii) BPVC.III.A-2015, Section III—Rules for Construction of Nuclear Facility Components, Appendices (incorporated by reference, see § 851.27);

(ix) BPVC.III.1.NB-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NB, Class 1 Components (incorporated by reference, see § 851.27);

(x) BPVC.III.1.NC-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NC, Class 2 Components (incorporated by reference, see § 851.27);

(xi) BPVC.III.1.ND-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection ND, Class 3 Components (incorporated by reference, see § 851.27);

(xii) BPVC.III.1.NE-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NE, Class MC Components (incorporated by reference, see § 851.27);

(xiii) BPVC.III.1.NF-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NF, Supports (incorporated by reference, see § 851.27);

(xiv) BPVC.III.1.NG-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NG, Core Support Structures (incorporated by reference, see § 851.27);

(xv) BPVC.III.1.NH-2015, Section III—Rules for Construction of Nuclear Facility Components, Division I—Subsection NH, Class 1 Components in Elevated Temperature Service (incorporated by reference, see § 851.27);

(xvi) BPVC.III.NCA-2015, Section III—Rules for Construction of Nuclear Facility; Components, Subsection NCA, General Requirements for Division 1 and Division 2 (incorporated by reference, see § 851.27);

(xvii) BPVC.III.2-2015, Section III—Rules for Construction of Nuclear Facility Components, Division 2, Code for Concrete Containments (incorporated by reference, see § 851.27);

(xviii) BPVC.III.3-2015, Section III—Rules for Construction of Nuclear Facility Components, Division 3, Containment for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste (incorporated by reference, see § 851.27);

(xix) BPVC.III.5-2015, Section III—Rules for Construction of Nuclear Facility Components, Division 5, High Temperature Reactors (incorporated by reference, see § 851.27);

(xx) BPVC.IV-2015, Section IV, Rules for Construction of Heating Boilers (incorporated by reference, see § 851.27);

(xxi) BPVC.V-2015, Section V, Nondestructive Examination (incorporated by reference, see § 851.27);

(xxii) BPVC.VI-2015, Section VI, Recommended Rules for the Care and Operation of Heating Boilers (incorporated by reference, see § 851.27);

(xxiii) BPVC.VII-2015, Section VII, Recommended Guidelines for the Care of Power Boilers (incorporated by reference, see § 851.27);

(xxiv) BPVC.VIII.1-2015, Section VIII—Rules for Construction of Pressure Vessels, Division 1 (incorporated by reference, see § 851.27);

(xxv) BPVC.VIII.2-2015, Section VIII—Rules for Construction of Pressure Vessels, Division 2, Alternative Rules (incorporated by reference, see § 851.27);

(xxvi) BPVC.VIII.3-2015, Section VIII—Rules for Construction of Pressure Vessels, Division 3, Alternative Rules for Construction of High Pressure Vessels (incorporated by reference, see § 851.27);

(xxvii) BPVC.IX-2015, Section IX—Welding, Brazing and Fusing Qualifications, Qualification Standard for Welding, Brazing, and Fusing Procedures; Welders; Brazers; and Welding, Brazing, and Fusing Operators (incorporated by reference, see § 851.27);

(xxviii) BPVC.X-2015, Section X, Fiber—Reinforced Plastic Pressure Vessels (incorporated by reference, see § 851.27);

(xxix) BPVC.XI-2015, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components (incorporated by reference, see § 851.27);

(xxx) BPVC.XII-2015, Section XII, Rules for Construction and Continued Service of Transport Tanks (incorporated by reference, see § 851.27);

(xxxi) BPVC.CC.BPV-2015, Code Cases, Boilers and Pressure Vessels (incorporated by reference, see § 851.27); and

(xxxii) BPVC.CC.NC-2015, Code Cases, Nuclear Components (incorporated by reference, see § 851.27).

(2) The applicable ASME B31 code for pressure piping as indicated in this paragraph; and or as indicated in paragraph (b)(3) of this section:

(i) B31.1-2016, Power Piping (incorporated by reference, see § 851.27);

(ii) B31.3-2014, Process Piping (incorporated by reference, see § 851.27);

(iii) B31.4-2016, Pipeline Transportation Systems for Liquids and Slurries (incorporated by reference, see § 851.27);

(iv) B31.5-2016, Refrigeration Piping and Heat Transfer Components (incorporated by reference, see § 851.27);

(v) B31.8-2016, Gas Transmission and Distribution Piping Systems (incorporated by reference, see § 851.27);

(vi) B31.8S-2014, Managing System Integrity of Gas Pipelines (incorporated by reference, see § 851.27);

(vii) B31.9-2014, Building Services Piping (incorporated by reference, see § 851.27); and

(viii) B31G-2012, Manual for Determining the Remaining Strength of Corroded Pipelines (incorporated by reference, see § 851.27).

(3) The strictest applicable state and local codes.

(c) When national consensus codes are not applicable (because of pressure range, vessel geometry, use of special materials, etc.), contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local code. Measures must include the following:

(1) Design drawings, sketches, and calculations must be reviewed and approved by a qualified independent design professional (i.e., professional engineer). Documented organizational peer review is acceptable.

(2) Qualified personnel must be used to perform examinations and inspections of materials, in-process fabrications, non-destructive tests, and acceptance test.

(3) Documentation, traceability, and accountability must be maintained for each unique pressure vessel or system, including descriptions of design, pressure conditions, testing, inspection, operation, repair, and maintenance.

5. Firearms Safety

(a) A contractor engaged in DOE activities involving the use of firearms must establish firearms safety policies and procedures for security operations, and training to ensure proper accident prevention controls are in place.

(1) Written procedures must address firearms safety, engineering and administrative controls, as well as personal protective equipment requirements.

(2) As a minimum, procedures must be established for:

(i) Storage, handling, cleaning, inventory, and maintenance of firearms and associated ammunition;

(ii) Activities such as loading, unloading, and exchanging firearms. These procedures must address use of bullet containment devices and those techniques to be used when no bullet containment device is available;

(iii) Use and storage of pyrotechnics, explosives, and/or explosive projectiles;

(iv) Handling misfires, duds, and unauthorized discharges;

(v) Live fire training, qualification, and evaluation activities;

(vi) Training and exercises using engagement simulation systems;

(vii) Medical response at firearms training facilities; and

(viii) Use of firing ranges by personnel other than DOE or DOE contractor protective forces personnel.

(b) Contractors must ensure that personnel responsible for the direction and operation of the firearms safety program are professionally qualified and have sufficient time and authority to implement the procedures under this section.

(c) Contractors must ensure that firearms instructors and armorers have been certified by the Safeguards and Security National Training Center to conduct the level of activity provided. Personnel must not be allowed to conduct activities for which they have not been certified.

(d) Contractors must conduct formal appraisals assessing implementation of procedures, personnel responsibilities, and duty assignments to ensure overall policy objectives and performance criteria are being met by qualified personnel.

(e) Contractors must implement procedures related to firearms training, live fire range safety, qualification, and evaluation activities, including procedures requiring that:

(1) Personnel must successfully complete initial firearms safety training before being issued any firearms. Authorization to remain in armed status will continue only if the employee demonstrates the technical and practical knowledge of firearms safety semi-annually;

(2) Authorized armed personnel must demonstrate through documented limited scope performance tests both technical and practical knowledge of firearms handling and safety on a semi-annual basis;

(3) All firearms training lesson plans must incorporate safety for all aspects of firearms training task performance standards. The lesson plans must follow the standards set forth by the Safeguards and Security Central Training Academy's standard training programs;

(4) Firearms safety briefings must immediately precede training, qualifications, and evaluation activities involving live fire and/or engagement simulation systems;

(5) A safety analysis approved by the Head of DOE Field Element must be developed for the facilities and operation of each live fire range prior to implementation of any new training, qualification, or evaluation activity. Results of these analyses must be incorporated into procedures, lesson plans, exercise plans, and limited scope performance tests;

(6) Firing range safety procedures must be conspicuously posted at all range facilities; and

(7) Live fire ranges, approved by the Head of DOE Field Element, must be properly sited to protect personnel on the range, as well as personnel and property not associated with the range.

(f) Contractors must ensure that the transportation, handling, placarding, and storage of munitions conform to the applicable DOE requirements.

6. Industrial Hygiene

Contractors must implement a comprehensive industrial hygiene program that includes at least the following elements:

(a) Initial or baseline surveys and periodic resurveys and/or exposure monitoring as appropriate of all work areas or operations to identify and evaluate potential worker health risks;

(b) Coordination with planning and design personnel to anticipate and control health hazards that proposed facilities and operations would introduce;

(c) Coordination with cognizant occupational medical, environmental, health physics, and work planning professionals;

(d) Policies and procedures to mitigate the risk from identified and potential occupational carcinogens;

(e) Professionally and technically qualified industrial hygienists to manage and implement the industrial hygiene program; and

(f) Use of respiratory protection equipment tested under the DOE Respirator Acceptance Program for Supplied-Air Suits when the National Institute for Occupational Safety and Health-approved respiratory protection does not exist for DOE tasks that require such equipment. For security operations military type masks for respiratory protection by security personnel is acceptable.

7. Biological Safety

(a) Contractors must establish and implement a biological safety program that:

(1) Establishes an Institutional Biosafety Committee (IBC) or equivalent. The IBC must:

(i) Review any work with biological etiologic agents for compliance with applicable Centers for Disease Control and Prevention (CDC), National Institutes of Health (NIH), World Health Organization (WHO), United States Department of Agriculture Animal and Plant Health Inspection Service (USDA/APHIS), and other international, Federal, State, and local guidelines and assess the containment level, facilities, procedures, practices, and training and expertise of personnel; and

(ii) Review the site's security, safeguards, and emergency management plans and procedures to ensure they adequately consider work involving biological etiologic agents.

(2) Maintains an inventory and status of biological etiologic agents, and provide to the responsible field and area office, through the laboratory IBC (or its equivalent), an annual status report describing the status and inventory of biological etiologic agents and the biological safety program.

(3) Provides for submission to the appropriate Head of DOE Field Element, for review and concurrence before transmittal to the Federal Select Agent Program, each Laboratory Registration/Select Agent Program registration application package (APHIS/CDC Form 1, Application for Registration for Possession, Use, and Transfer of Select Agents and Toxins) requesting registration of (or amendment to a previously approved registration) a laboratory facility for the purpose of possessing, using, or transferring biological select agents and/or toxins.

(4) Provides for submission to the appropriate Head of DOE Field Element, a copy of each APHIS/CDC Form 2, Request to Transfer Select Agents and Toxins, upon initial submission of APHIS/CDC Form 2 to a vendor or other supplier requesting or ordering a biological select agent or toxin for transfer, receipt, and handling in the registered facility; and submission to the appropriate Head of DOE Field Element the completed copy of the APHIS/CDC Form 2, documenting final disposition and/or destruction of the select agent or toxin, within 10 days of completion of the APHIS/CDC Form 2.

(5) Confirms that the site safeguards and security plans and emergency management programs address biological etiologic agents, with particular emphasis on biological select agents.

(6) Establishes an immunization policy for personnel working with biological etiologic agents based on the evaluation of risk and benefit of immunization.

(b) [Reserved]

8. Occupational Medicine

(a) Contractors must establish and provide comprehensive occupational medicine services to workers employed at a covered work place who:

(1) Work on a DOE site for more than 30 days in a 12-month period; or

(2) Are enrolled for any length of time in a medical or exposure monitoring program required by this rule and/or any other applicable Federal, State or local regulation, or other obligation.

(b) The occupational medicine services must be under the direction of a graduate of a school of medicine or osteopathy who is licensed for the practice of medicine in the state in which the site is located.

(c) Occupational medical physicians, occupational health nurses, physician's assistants, nurse practitioners, psychologists, employee assistance counselors, and other occupational health personnel providing occupational medicine services must be licensed, registered, or certified as required by Federal or State law where employed.

(d) Contractors must provide the occupational medicine providers access to hazard information by promoting its communication, coordination, and sharing among operating and environment, safety, and health protection organizations.

(1) Contractors must provide the occupational medicine providers with access to information on the following:

(i) Current information about actual or potential work-related site hazards (chemical, radiological, physical, biological, or ergonomic);

(ii) Employee job-task and hazard analysis information, including essential job functions;

(iii) Actual or potential work-site exposures of each employee; and

(iv) Personnel actions resulting in a change of job functions, hazards or exposures.

(2) Contractors must notify the occupational medicine providers when an employee has been absent because of an injury or illness for more than 5 consecutive workdays (or an equivalent time period for those individuals on an alternative work schedule);

(3) Contractors must provide the occupational medicine provider information on, and the opportunity to participate in, worker safety and health team meetings and committees;

(4) Contractors must provide occupational medicine providers access to the workplace for evaluation of job conditions and issues relating to workers' health.

(e) A designated occupational medicine provider must:

(1) Plan and implement the occupation medicine services; and

(2) Participate in worker protection teams to build and maintain necessary partnerships among workers, their representatives, managers, and safety and health protection specialists in establishing and maintaining a safe and healthful workplace.

(f) A record, containing any medical, health history, exposure history, and demographic data collected for the occupational medicine purposes, must be developed and maintained for each employee for whom medical services are provided. All occupational medical records must be maintained in accordance with Executive Order 13335, Incentives for the Use of Health Information Technology.

(1) Employee medical, psychological, and employee assistance program (EAP) records must be kept confidential, protected from unauthorized access, and stored under conditions that ensure their long-term preservation. Psychological records must be maintained separately from medical records and in the custody the designated psychologist in accordance with 10 CFR 712.38(b)(2).

(2) Access to these records must be provided in accordance with DOE regulations implementing the Privacy Act and the Energy Employees Occupational Illness Compensation Program Act.

(g) The occupational medicine services provider must determine the content of the worker health evaluations, which must be conducted under the direction of a licensed physician, in accordance with current sound and acceptable medical practices and all pertinent statutory and regulatory requirements, such as the Americans with Disabilities Act.

(1) Workers must be informed of the purpose and nature of the medical evaluations and tests offered by the occupational medicine provider.

(i) The purpose, nature and results of evaluations and tests must be clearly communicated verbally and in writing to each worker provided testing;

(ii) The communication must be documented in the worker's medical record; and

(2) The following health evaluations must be conducted when determined necessary by the occupational medicine provider for the purpose of providing initial and continuing assessment of employee fitness for duty.

(i) At the time of employment entrance or transfer to a job with new functions and hazards, a medical placement evaluation of the individual's general health and physical and psychological capacity to perform work will establish a baseline record of physical condition and assure fitness for duty.

(ii) Periodic, hazard-based medical monitoring or qualification-based fitness for duty evaluations required by regulations and standards, or as recommended by the occupational medicine services provider, will be provided on the frequency required.

(iii) Diagnostic examinations will evaluate employee's injuries and illnesses to determine work-relatedness, the applicability of medical restrictions, and referral for definitive care, as appropriate.

(iv) After a work-related injury or illness or an absence due to any injury or illness lasting 5 or more consecutive workdays (or an equivalent time period for those individuals on an alternative work schedule), a return to work evaluation will determine the individual's physical and psychological capacity to perform work and return to duty.

(v) At the time of separation from employment, individuals shall be offered a general health evaluation to establish a record of physical condition.

(h) The occupational medicine provider must monitor ill and injured workers to facilitate their rehabilitation and safe return to work and to minimize lost time and its associated costs.

(1) The occupational medicine provider must place an individual under medical restrictions when health evaluations indicate that the worker should not perform certain job tasks. The occupational medicine provider must notify the worker and contractor management when employee work restrictions are imposed or removed.

(i) Occupational medicine provider physician and medical staff must, on a timely basis, communicate results of health evaluations to management and safety and health protection specialists to facilitate the mitigation of worksite hazards.

(j) The occupational medicine provider must include measures to identify and manage the principal preventable causes of premature morbidity and mortality affecting worker health and productivity.

(1) The contractor must include programs to prevent and manage these causes of morbidity when evaluations demonstrate their cost effectiveness.

(2) Contractors must make available to the occupational medicine provider appropriate access to information from health, disability, and other insurance plans (de-identified as necessary) in order to facilitate this process.

(k) The occupational medicine services provider must review and approve the medical and behavioral aspects of employee counseling and health promotional programs, including the following types:

(1) Contractor-sponsored or contractor-supported EAPs;

(2) Contractor-sponsored or contractor-supported alcohol and other substance abuse rehabilitation programs; and

(3) Contractor-sponsored or contractor-supported wellness programs.

(4) The occupational medicine services provider must review the medical aspects of immunization programs, blood-borne pathogens programs, and bio-hazardous waste programs to evaluate their conformance to applicable guidelines.

(5) The occupational medicine services provider must develop and periodically review medical emergency response procedures included in site emergency and disaster preparedness plans. The medical emergency responses must be integrated with nearby community emergency and disaster plans.

9. Motor Vehicle Safety

(a) Contractors must implement a motor vehicle safety program to protect the safety and health of all drivers and passengers in Government-owned or -leased motor vehicles and powered industrial equipment (i.e., fork trucks, tractors, platform lift trucks, and other similar specialized equipment powered by an electric motor or an internal combustion engine).

(b) The contractor must tailor the motor vehicle safety program to the individual DOE site or facility, based on an analysis of the needs of that particular site or facility.

(c) The motor vehicle safety program must address, as applicable to the contractor's operations:

(1) Minimum licensing requirements (including appropriate testing and medical qualification) for personnel operating motor vehicles and powered industrial equipment;

(2) Requirements for the use of seat belts and provision of other safety devices;

(3) Training for specialty vehicle operators;

(4) Requirements for motor vehicle maintenance and inspection;

(5) Uniform traffic and pedestrian control devices and road signs;

(6) On-site speed limits and other traffic rules;

(7) Awareness campaigns and incentive programs to encourage safe driving; and

(8) Enforcement provisions.

10. Electrical Safety

Contractors must implement a comprehensive electrical safety program appropriate for the activities at their site. This program must meet the applicable electrical safety codes and standards referenced in § 851.23.

11. Nanotechnology Safety—Reserved

The Department has chosen to reserve this section since policy and procedures for nanotechnology safety are currently being developed. Once these policies and procedures have been approved, the rule will be amended to include them through a rulemaking consistent with the Administrative Procedure Act.

12. Workplace Violence Prevention—Reserved

The Department has chosen to reserve this section since the policy and procedures for workplace violence prevention are currently being developed. Once these policies and procedures have been approved, the rule will be amended to include them through a rulemaking consistent with the Administrative Procedure Act.

[71 FR 6931, Feb. 9, 2006; 71 FR 36661, June 28, 2006; 80 FR 69566, Nov. 10, 2015; 82 FR 59956, Dec. 18, 2017]

Appendix B to Part 851 General Statement of Enforcement Policy

I. Introduction

(a) This policy statement sets forth the general framework through which the U.S. Department of Energy (DOE) will seek to ensure compliance with its worker safety and health regulations, and, in particular, exercise the civil penalty authority provided to DOE in section 3173 of Public Law 107-314, Bob Stump National Defense Authorization Act for Fiscal Year 2003 (December 2, 2002) (“NDAA”), amending the Atomic Energy Act (AEA) to add section 234C. The policy set forth herein is applicable to violations of safety and health regulations in this part by DOE contractors, including DOE contractors who are indemnified under the Price-Anderson Act, 42 U.S.C. 2210(d), and their subcontractors and suppliers (hereafter collectively referred to as DOE contractors). This policy statement is not a regulation and is intended only to provide general guidance to those persons subject to the regulations in this part. It is not intended to establish a “cookbook” approach to the initiation and resolution of situations involving noncompliance with the regulations in this part. Rather, DOE intends to consider the particular facts of each noncompliance in determining whether enforcement sanctions are appropriate and, if so, the appropriate magnitude of those sanctions. DOE may well deviate from this policy statement when appropriate in the circumstances of particular cases. This policy statement is not applicable to activities and facilities covered under E.O. 12344, 42 U.S.C. 7158 note, pertaining to Naval Nuclear Propulsion, or otherwise excluded from the scope of the rule.

(b) The DOE goal in the compliance arena is to enhance and protect the safety and health of workers at DOE facilities by fostering a culture among both the DOE line organizations and the contractors that actively seeks to attain and sustain compliance with the regulations in this part. The enforcement program and policy have been developed with the express purpose of achieving safety inquisitiveness and voluntary compliance. DOE will establish effective administrative processes and positive incentives to the contractors for the open and prompt identification and reporting of noncompliances, performance of effective root cause analysis, and initiation of comprehensive corrective actions to resolve both noncompliance conditions and program or process deficiencies that led to noncompliance.

(c) In the development of the DOE enforcement policy, DOE recognizes that the reasonable exercise of its enforcement authority can help to reduce the likelihood of serious incidents. This can be accomplished by placing greater emphasis on a culture of safety in existing DOE operations, and strong incentives for contractors to identify and correct noncompliance conditions and processes in order to protect human health and the environment. DOE wants to facilitate, encourage, and support contractor initiatives for the prompt identification and correction of noncompliances. DOE will give due consideration to such initiatives and activities in exercising its enforcement discretion.

(d) DOE may modify or remit civil penalties in a manner consistent with the adjustment factors set forth in this policy with or without conditions. DOE will carefully consider the facts of each case of noncompliance and will exercise appropriate discretion in taking any enforcement action. Part of the function of a sound enforcement program is to assure a proper and continuing level of safety vigilance. The reasonable exercise of enforcement authority will be facilitated by the appropriate application of safety requirements to DOE facilities and by promoting and coordinating the proper contractor and DOE safety compliance attitude toward those requirements.

II. Purpose

The purpose of the DOE enforcement program is to promote and protect the safety and health of workers at DOE facilities by:

(a) Ensuring compliance by DOE contractors with the regulations in this part.

(b) Providing positive incentives for DOE contractors based on:

(1) Timely self-identification of worker safety noncompliances;

(2) Prompt and complete reporting of such noncompliances to DOE;

(3) Prompt correction of safety noncompliances in a manner that precludes recurrence; and

(4) Identification of modifications in practices or facilities that can improve worker safety and health.

(c) Deterring future violations of DOE requirements by a DOE contractor.

(d) Encouraging the continuous overall improvement of operations at DOE facilities.

III. Statutory Authority

The Department of Energy Organization Act, 42 U.S.C. 7101-7385o, the Energy Reorganization Act of 1974 (ERA), 42 U.S.C. 5801-5911, and the Atomic Energy Act of 1954, as amended, (AEA) 42 U.S.C. 2011, require DOE to protect the public safety and health, as well as the safety and health of workers at DOE facilities, in conducting its activities, and grant DOE broad authority to achieve this goal. Section 234C of the AEA makes DOE contractors (and their subcontractors and suppliers thereto) covered by the DOE Price-Anderson indemnification system, subject to civil penalties for violations of the worker safety and health requirements promulgated in this part. 42 U.S.C. 2282c.

IV. Responsibilities

(a) The Enforcement Director, as the principal enforcement officer of the DOE, has been delegated the authority to:

(1) Conduct enforcement inspections, investigations, and conferences;

(2) Issue Notices of Violations and proposed civil penalties, Enforcement Letters, Consent Orders, and subpoenas; and

(3) Issue orders to compel attendance and disclosure of information or documents obtained during an investigation or inspection. The Secretary issues Compliance Orders.

(b) The NNSA Administrator, rather than the Enforcement Director, signs, issues and serves the following actions that direct NNSA contractors:

(1) Subpoenas;

(2) Orders to compel attendance; and

(3) Determines to disclose information or documents obtained during an investigation or inspection, PNOVs, Notices of Violations, and Final Notices of Violations. The NNSA Administrator acts after consideration of the Enforcement Director's recommendation.

V. Procedural Framework

(a) Title 10 CFR part 851 sets forth the procedures DOE will use in exercising its enforcement authority, including the issuance of Notices of Violation and the resolution of an administrative appeal in the event a DOE contractor elects to petition the Office of Hearings and Appeals for review.

(b) Pursuant to 10 CFR part 851 subpart E, the Enforcement Director initiates the enforcement process by initiating and conducting investigations and inspections and issuing a Preliminary Notice of Violation (PNOV) with or without a proposed civil penalty. The DOE contractor is required to respond in writing to the PNOV within 30 days, either: (1) Admitting the violation and waiving its right to contest the proposed civil penalty and paying it; (2) admitting the violation but asserting the existence of mitigating circumstances that warrant either the total or partial remission of the civil penalty; or (3) denying that the violation has occurred and providing the basis for its belief that the PNOV is incorrect. After evaluation of the DOE contractor's response, the Enforcement Director may determine: (1) That no violation has occurred; (2) that the violation occurred as alleged in the PNOV but that the proposed civil penalty should be remitted in whole or in part; or (3) that the violation occurred as alleged in the PNOV and that the proposed civil penalty is appropriate, notwithstanding the asserted mitigating circumstances. In the latter two instances, the Enforcement Director will issue a Final Notice of Violation (FNOV) or an FNOV and proposed civil penalty.

(c) An opportunity to challenge an FNOV is provided in administrative appeal provisions. See 10 CFR 851.44. Any contractor that receives an FNOV may petition the Office of Hearings and Appeals for review of the final notice in accordance with 10 CFR part 1003, within 30 calendar days from receipt of the final notice. An administrative appeal proceeding is not initiated until the DOE contractor against which an FNOV has been issued requests an administrative hearing rather than waiving its right to contest the FNOV and proposed civil penalty, if any, and paying the civil penalty. However, it should be emphasized that DOE encourages the voluntary resolution of a noncompliance situation at any time, either informally prior to the initiation of the enforcement process or by consent order before or after any formal proceeding has begun.

VI. Severity of Violations

(a) Violations of the worker safety and health requirements in this part have varying degrees of safety and health significance. Therefore, the relative safety and health risk of each violation must be identified as the first step in the enforcement process. Violations of the worker safety and health requirements are categorized in two levels of severity to identify their relative seriousness. Notices of Violation issued for noncompliance when appropriate, propose civil penalties commensurate with the severity level of the violations involved.

(b) To assess the potential safety and health impact of a particular violation, DOE will categorize the potential severity of violations of worker safety and health requirements as follows:

(1) A Severity Level I violation is a serious violation. A serious violation shall be deemed to exist in a place of employment if there is a potential that death or serious physical harm could result from a condition which exists, or from one or more practices, means, methods, operations, or processes which have been adopted or are in use, in such place of employment. A Severity Level I violation would be subject to a base civil penalty of up to 100% of the maximum base civil penalty of $121,876.

(2) A Severity Level II violation is an other-than-serious violation. An other-than-serious violation occurs where the most serious injury or illness that would potentially result from a hazardous condition cannot reasonably be predicted to cause death or serious physical harm to employees but does have a direct relationship to their safety and health. A Severity Level II violation would be subject to a base civil penalty up to 50% of the maximum base civil penalty ($60,938).

(c) De minimis violations, defined as a deviation from the requirement of a standard that has no direct or immediate relationship to safety or health, will not be the subject of formal enforcement action through the issuance of a Notice of Violation.

VII. Enforcement Conferences

(a) The purpose of the enforcement conference is to:

(1) Assure the accuracy of the facts upon which the preliminary determination to consider enforcement action is based;

(2) Discuss the potential or alleged violations, their significance and causes, and the nature of and schedule for the DOE contractor's corrective actions;

(3) Determine whether there are any aggravating or mitigating circumstances; and

(4) Obtain other information which will help determine whether enforcement action is appropriate and, if so, the extent of that enforcement action.

(b) All enforcement conferences are convened at the discretion of the Enforcement Director.

(c) The PNOV will normally be issued promptly, before the opportunity for an enforcement conference, following the inspection/investigation. In some cases an enforcement conference may be conducted onsite at the conclusion of an inspection/investigation.

(d) The contractor may request an enforcement conference if they believe additional information pertinent to the enforcement action could best be conveyed through a meeting.

(e) DOE contractors will be informed prior to a meeting when that meeting is considered to be an enforcement conference. Such conferences are informal mechanisms for candid discussions regarding potential or alleged violations and will not normally be open to the public. In circumstances for which immediate enforcement action is necessary in the interest of worker safety and health, such action will be taken prior to the enforcement conference, which may still be held after the necessary DOE action has been taken.

VIII. Enforcement Letter

(a) In cases where DOE has decided not to conduct an investigation or inspection or issue a Preliminary Notice of Violation (PNOV), DOE may send an Enforcement Letter, signed by the Enforcement Director to the contractor. The Enforcement Letter is intended to communicate the basis of the decision not to pursue enforcement action for a noncompliance. The Enforcement Letter is intended to direct contractors to the desired level of worker safety and health performance. It may be used when DOE concludes that the specific noncompliance at issue is not of the level of significance warranted to conduct an investigation or inspection or for issuance of a PNOV. Even where a noncompliance may be significant, the Enforcement Letter may recognize that the contractor's actions may have attenuated the need for enforcement action. The Enforcement Letter will typically recognize how the contractor handled the circumstances surrounding the noncompliance, address additional areas requiring the contractor's attention, and address DOE's expectations for corrective action.

(b) In general, Enforcement Letters communicate DOE's expectations with respect to any aspect of the requirements of this part, including identification and reporting of issues, corrective actions, and implementation of the contractor's safety and health program. DOE might, for example, wish to recognize some action of the contractor that is of particular benefit to worker safety and health that is a candidate for emulation by other contractors. On the other hand, DOE may wish to bring a program shortcoming to the attention of the contractor that, but for the lack of worker safety and health significance of the immediate issue, might have resulted in the issuance of a PNOV. An Enforcement Letter is not an enforcement action.

(c) With respect to many noncompliances, an Enforcement Letter may not be required. When DOE decides that a contractor has appropriately corrected a noncompliance or that the significance of the noncompliance is sufficiently low, it may close out its review simply through an annotation in the DOE Noncompliance Tracking System (NTS). A closeout of a noncompliance with or without an Enforcement Letter may only take place after DOE has confirmed that corrective actions have been completed.

IX. Enforcement Actions

(a) This section describes the enforcement sanctions available to DOE and specifies the conditions under which each may be used. The basic sanctions are Notices of Violation and civil penalties.

(b) The nature and extent of the enforcement action is intended to reflect the seriousness of the violation. For the vast majority of violations for which DOE assigns severity levels as described previously, a Notice of Violation will be issued, requiring a formal response from the recipient describing the nature of and schedule for corrective actions it intends to take regarding the violation.

1. Notice of Violation

(a) A Notice of Violation (either a Preliminary or Final Notice) is a document setting forth the conclusion of DOE and the basis to support the conclusion, that one or more violations of the worker safety and health requirements have occurred. Such a notice normally requires the recipient to provide a written response which may take one of several positions described in section V of this policy statement. In the event that the recipient concedes the occurrence of the violation, it is required to describe corrective steps which have been taken and the results achieved; remedial actions which will be taken to prevent recurrence; and the date by which full compliance will be achieved.

(b) DOE will use the Notice of Violation as the standard method for formalizing the existence of a violation and, in appropriate cases as described in this section, the Notice of Violation will be issued in conjunction with the proposed imposition of a civil penalty. In certain limited instances, as described in this section, DOE may refrain from the issuance of an otherwise appropriate Notice of Violation. However, a Notice of Violation will virtually always be issued for willful violations, or if past corrective actions for similar violations have not been sufficient to prevent recurrence and there are no other mitigating circumstances.

(c) DOE contractors are not ordinarily cited for violations resulting from matters not within their control, such as equipment failures that were not avoidable by reasonable quality assurance measures, proper maintenance, or management controls. With regard to the issue of funding, however, DOE does not consider an asserted lack of funding to be a justification for noncompliance with the worker safety and health requirements.

(d) DOE expects its contractors to have the proper management and supervisory systems in place to assure that all activities at covered workplaces, regardless of who performs them, are carried out in compliance with all the worker safety and health requirements. Therefore, contractors are normally held responsible for the acts of their employees and subcontractor employees in the conduct of activities at covered workplaces. Accordingly, this policy should not be construed to excuse personnel errors.

(e) The limitations on remedies under section 234C will be implemented as follows:

(1) DOE may assess civil penalties of up to $121,876 per violation per day on contractors (and their subcontractors and suppliers) that are indemnified by the Price-Anderson Act, 42 U.S.C. 2210(d). See 10 CFR 851.5(a).

(2) DOE may seek contract fee reductions through the contract's Conditional Payment of Fee Clause in the Department of Energy Acquisition Regulation (DEAR). See 10 CFR 851.4(b); 48 CFR parts 923, 952, 970. Policies for contract fee reductions are not established by this policy statement. The Enforcement Director and appropriate contracting officers will coordinate their efforts in compliance with the statute. See 10 CFR 851.5(b).

(3) For the same violation of a worker safety and health requirement in this part, DOE may pursue either civil penalties (for indemnified contractors and their subcontractors and suppliers) or a contract fee reduction, but not both. See 10 CFR 851.5(c).

(4) A ceiling applies to civil penalties assessed on certain contractors specifically listed in 170d. of the Atomic Energy Act, 42 U.S.C. 2282a(d), for activities conducted at specified facilities. For these contractors, the total amount of civil penalties and contract penalties in a fiscal year may not exceed the total amount of fees paid by DOE to that entity in that fiscal year. See 10 CFR 851.5(d).

2. Civil Penalty

(a) A civil penalty is a monetary penalty that may be imposed for violations of requirements of this part. See 10 CFR 851.5(a). Civil penalties are designed to emphasize the need for lasting remedial action, deter future violations, and underscore the importance of DOE contractor self-identification, reporting, and correction of violations of the worker safety and health requirements in this part.

(b) Absent mitigating circumstances as described below, or circumstances otherwise warranting the exercise of enforcement discretion by DOE as described in this section, civil penalties will be proposed for Severity Level I and II violations.

(c) DOE will impose different base level penalties considering the severity level of the violation. Table A-1 shows the daily base civil penalties for the various categories of severity levels. However, as described below in section IX, paragraph b.3, the imposition of civil penalties will also take into account the gravity, circumstances, and extent of the violation or violations and, with respect to the violator, any history of prior similar violations and the degree of culpability and knowledge.

(d) Enforcement personnel will use risk-based criteria to assist the Enforcement Director in determining appropriate civil penalties for violations found during investigations and inspections.

(e) Regarding the factor of ability of DOE contractors to pay the civil penalties, it is not DOE's intention that the economic impact of a civil penalty be such that it puts a DOE contractor out of business. Contract termination, rather than civil penalties, is used when the intent is to terminate these activities. The deterrent effect of civil penalties is best served when the amount of such penalties takes this factor into account. However, DOE will evaluate the relationship of affiliated entities to the contractor (such as parent corporations) when the contractor asserts that it cannot pay the proposed penalty.

(f) DOE will review each case on its own merits and adjust the base civil penalty values upward or downward. As indicated below, Table A-1 identifies the daily base civil penalty values for different severity levels. After considering all relevant circumstances, civil penalties may be adjusted up or down based on the mitigating or aggravating factors described later in this section. In no instance will a civil penalty for any one violation exceed the statutory limit, as periodically adjusted for inflation as required by law, per day. In cases where the DOE contractor had knowledge of a violation and has not reported it to DOE and taken corrective action despite an opportunity to do so, DOE will consider utilizing its per day civil penalty authority. Further, as described in this section, the duration of a violation will be taken into account in adjusting the base civil penalty.

Table A-1—Severity Level Base Civil Penalties

Severity level | Base civil penalty amount (Percentage of maximum per violation per day)

I | 100

II | 50

3. Adjustment Factors

(a) DOE may reduce a penalty based on mitigating circumstances or increase a penalty based on aggravating circumstances. DOE's enforcement program is not an end in itself, but a means to achieve compliance with the worker safety and health requirements in this part. Civil penalties are intended to emphasize the importance of compliance and to deter future violations. The single most important goal of the DOE enforcement program is to encourage early identification and reporting of violations of the worker safety and health requirements in this part by the DOE contractors themselves rather than by DOE, and the prompt correction of any violations so identified. DOE believes that DOE contractors are in the best position to identify and promptly correct noncompliance with the worker safety and health requirements in this part. DOE expects that these contractors should have in place internal compliance programs which will ensure the detection, reporting, and prompt correction of conditions that may constitute, or lead to, violations of the worker safety and health requirements in this part, before, rather than after, DOE has identified such violations. Thus, DOE contractors should almost always be aware of worker safety and health noncompliances before they are discovered by DOE. Obviously, worker safety and health is enhanced if noncompliances are discovered (and promptly corrected) by the DOE contractor, rather than by DOE, which may not otherwise become aware of a noncompliance until later, during the course of an inspection, performance assessment, or following an incident at the facility. Early identification of worker safety and health-related noncompliances by DOE contractors has the added benefit of allowing information that could prevent such noncompliances at other facilities in the DOE complex to be shared with other appropriate DOE contractors.

(b) Pursuant to this enforcement philosophy, DOE will provide substantial incentive for the early self-identification, reporting, and prompt correction of conditions which constitute, or could lead to, violations of the worker safety and health requirements. Thus, the civil penalty may be reduced for violations that are identified, reported, and promptly and effectively corrected by the DOE contractor.

(c) On the other hand, ineffective programs for problem identification and correction are aggravating circumstances and may increase the penalty amount. Thus, for example, where a contractor fails to disclose and promptly correct violations of which it was aware or should have been aware, substantial civil penalties are warranted and may be sought, including the assessment of civil penalties for continuing violations on a per day basis.

(d) Further, in cases involving factors of willfulness, repeated violations, death, serious injury, patterns of systemic violations, DOE-identified flagrant violations, repeated poor performance in an area of concern, or serious breakdown in management controls, DOE intends to apply its full statutory enforcement authority where such action is warranted.

(e) Additionally, adjustment to the amount of civil penalty will be dependent, in part, on the degree of culpability of the DOE contractor with regard to the violation. Thus, inadvertent violations will be viewed differently from those in which there is gross negligence, deception, or willfulness. In addition to the severity of the underlying violation and level of culpability involved, DOE will also consider the position, training and experience of those involved in the violation. Thus, for example, a violation may be deemed to be more significant if a senior manager of an organization is involved rather than a foreman or non-supervisory employee.

(f) Other factors that will be considered in determining the civil penalty amount are the duration of the violation (how long the condition has presented a potential exposure to workers), the extent of the condition (number of instances of the violation), the frequency of the exposure (how often workers are exposed), the proximity of the workers to the exposure, and the past history of similar violations.

(g) DOE expects contractors to provide full, complete, timely, and accurate information and reports. Accordingly, the penalty amount for a violation involving either a failure to make a required report or notification to the DOE or an untimely report or notification, will be based upon the circumstances surrounding the matter that should have been reported. A contractor will not normally be cited for a failure to report a condition or event unless the contractor was aware or should have been aware of the condition or event that it failed to report.

4. Identification and Reporting

Reduction of up to 50% of the base civil penalty shown in Table A-1 may be given when a DOE contractor identifies the violation and promptly reports the violation to the DOE. Consideration will be given to, among other things, the opportunity available to discover the violation, the ease of discovery and the promptness and completeness of any required report. No consideration will be given to a reduction in penalty if the DOE contractor does not take prompt action to report the problem to DOE upon discovery, or if the immediate actions necessary to restore compliance with the worker safety and health requirements are not taken.

5. Self-Identification and Tracking Systems

(a) DOE strongly encourages contractors to self-identify noncompliances with the worker safety and health requirements before the noncompliances lead to a string of similar and potentially more significant events or consequences. When a contractor identifies a noncompliance, DOE will normally allow a reduction in the amount of civil penalties, unless prior opportunities existed for contractors to identify the noncompliance. DOE will normally not allow a reduction in civil penalties for self-identification if significant DOE intervention was required to induce the contractor to report a noncompliance.

(b) Self-identification of a noncompliance is possibly the single most important factor in considering a reduction in the civil penalty amount. Consideration of self-identification is linked to, among other things, whether prior opportunities existed to discover the violation, and if so, the age and number of such opportunities; the extent to which proper contractor controls should have identified or prevented the violation; whether discovery of the violation resulted from a contractor's self-monitoring activity; the extent of DOE involvement in discovering the violation or in prompting the contractor to identify the violation; and the promptness and completeness of any required report. Self-identification is also considered by DOE in deciding whether to pursue an investigation.

(c) DOE will use the voluntary Noncompliance Tracking System (NTS) which allows contractors to elect to report noncompliances. In the guidance document supporting the NTS, DOE will establish reporting thresholds for reporting noncompliances of potentially greater worker safety and health significance into the NTS. Contractors are expected, however, to use their own self-tracking systems to track noncompliances below the reporting threshold. This self-tracking is considered to be acceptable self-reporting as long as DOE has access to the contractor's system and the contractor's system notes the item as a noncompliance with a DOE safety and health requirement. For noncompliances that are below the NTS reportability thresholds, DOE will credit contractor self-tracking as representing self-reporting. If an item is not reported in NTS but only tracked in the contractor's system and DOE subsequently determines that the noncompliance was significantly mischaracterized, DOE will not credit the internal tracking as representing appropriate self-reporting.

6. Self-Disclosing Events

(a) DOE expects contractors to demonstrate acceptance of responsibility for worker safety and health by proactively identifying noncompliances. When the occurrence of an event discloses noncompliances that the contractor could have or should have identified before the event, DOE will not generally reduce civil penalties for self-identification, even if the underlying noncompliances were reported to DOE. In deciding whether to reduce any civil penalty proposed for violations revealed by the occurrence of a self-disclosing event, DOE will consider the ease with which a contractor could have discovered the noncompliance and the prior opportunities that existed to discover the noncompliance. If a contractor simply reacts to events that disclose potentially significant consequences or downplays noncompliances which did not result in significant consequences to worker safety and health, such contractor actions do not constitute the type of proactive behavior necessary to prevent significant events from occurring and thereby to improve worker safety and health.

(b) The key test is whether the contractor reasonably could have detected any of the underlying noncompliances that contributed to the event. Examples of events that provide opportunities to identify noncompliances include, but are not limited to:

(1) Prior notifications of potential problems such as those from DOE operational experience publications or vendor equipment deficiency reports;

(2) Normal surveillance, quality assurance performance assessments, and post-maintenance testing;

(3) Readily observable parameter trends; and

(4) Contractor employee or DOE observations of potential worker safety and health problems.

(c) Failure to utilize these types of events and activities to address noncompliances may result in higher civil penalty assessments or a DOE decision not to reduce civil penalty amounts.

(d) Alternatively, if, following a self-disclosing event, DOE finds that the contractor's processes and procedures were adequate and the contractor's personnel generally behaved in a manner consistent with the contractor's processes and procedures, DOE could conclude that the contractor could not have been reasonably expected to find the single noncompliance that led to the event and thus, might allow a reduction in civil penalties.

7. Corrective Action To Prevent Recurrence

The promptness (or lack thereof) and extent to which the DOE contractor takes corrective action, including actions to identify root cause and prevent recurrence, may result in an increase or decrease in the base civil penalty shown in Table A-1. For example, appropriate corrective action may result in DOE's reducing the proposed civil penalty up to 50% from the base value shown in Table A-1. On the other hand, the civil penalty may be increased if initiation of corrective action is not prompt or if the corrective action is only minimally acceptable. In weighing this factor, consideration will be given to, among other things, the appropriateness, timeliness and degree of initiative associated with the corrective action. The comprehensiveness of the corrective action will also be considered, taking into account factors such as whether the action is focused narrowly to the specific violation or broadly to the general area of concern.

8. DOE's Contribution to a Violation

There may be circumstances in which a violation of a DOE worker safety and health requirement results, in part or entirely, from a direction given by DOE personnel to a DOE contractor to either take or forbear from taking an action at a DOE facility. In such cases, DOE may refrain from issuing an NOV, or may mitigate, either partially or entirely, any proposed civil penalty, provided that the direction upon which the DOE contractor relied is documented in writing, contemporaneously with the direction. It should be emphasized, however, that pursuant to 10 CFR 851.7, interpretative ruling of a requirement of this part must be issued in accordance with the provisions of 851.7 to be binding. Further, as discussed above in this policy statement, lack of funding by itself will not be considered as a mitigating factor in enforcement actions.

9. Exercise of Discretion

Because DOE wants to encourage and support DOE contractor initiative for prompt self-identification, reporting and correction of noncompliances, DOE may exercise discretion as follows:

(a) In accordance with the previous discussion, DOE may refrain from issuing a civil penalty for a violation that meets all of the following criteria:

(1) The violation is promptly identified and reported to DOE before DOE learns of it or the violation is identified by a DOE independent assessment, inspection or other formal program effort.

(2) The violation is not willful or is not a violation that could reasonably be expected to have been prevented by the DOE contractor's corrective action for a previous violation.

(3) The DOE contractor, upon discovery of the violation, has taken or begun to take prompt and appropriate action to correct the violation.

(4) The DOE contractor has taken, or has agreed to take, remedial action satisfactory to DOE to preclude recurrence of the violation and the underlying conditions that caused it.

(b) DOE will not issue a Notice of Violation for cases in which the violation discovered by the DOE contractor cannot reasonably be linked to the conduct of that contractor in the design, construction or operation of the DOE facility involved, provided that prompt and appropriate action is taken by the DOE contractor upon identification of the past violation to report to DOE and remedy the problem.

(c) In situations where corrective actions have been completed before termination of an inspection or assessment, a formal response from the contractor is not required and the inspection report serves to document the violation and the corrective action. However, in all instances, the contractor is required to report the noncompliance through established reporting mechanisms so the noncompliance and any corrective actions can be properly tracked and monitored.

(d) If DOE initiates an enforcement action for a violation, and as part of the corrective action for that violation, the DOE contractor identifies other examples of the violation with the same root cause, DOE may refrain from initiating an additional enforcement action. In determining whether to exercise this discretion, DOE will consider whether the DOE contractor acted reasonably and in a timely manner appropriate to the severity of the initial violation, the comprehensiveness of the corrective action, whether the matter was reported, and whether the additional violation(s) substantially change the significance or character of the concern arising out of the initial violation.

(e) The preceding paragraphs are examples indicating when enforcement discretion may be exercised to forego the issuance of a civil penalty or, in some cases, the initiation of any enforcement action at all. However, notwithstanding these examples, a civil penalty may be proposed or Notice of Violation issued when, in DOE's judgment, such action is warranted.

X. Inaccurate and Incomplete Information

(a) A violation of the worker safety and health requirements to provide complete and accurate information to DOE, 10 CFR 851.40, can result in the full range of enforcement sanctions, depending upon the circumstances of the particular case and consideration of the factors discussed in this section. Violations involving inaccurate or incomplete information or the failure to provide significant information identified by a DOE contractor normally will be categorized based on the guidance in section IX, “Enforcement Actions.”

(b) DOE recognizes that oral information may in some situations be inherently less reliable than written submittals because of the absence of an opportunity for reflection and management review. However, DOE must be able to rely on oral communications from officials of DOE contractors concerning significant information. In determining whether to take enforcement action for an oral statement, consideration will be given to such factors as:

(1) The degree of knowledge that the communicator should have had regarding the matter in view of his or her position, training, and experience;

(2) The opportunity and time available prior to the communication to assure the accuracy or completeness of the information;

(3) The degree of intent or negligence, if any, involved;

(4) The formality of the communication;

(5) The reasonableness of DOE reliance on the information;

(6) The importance of the information that was wrong or not provided; and

(7) The reasonableness of the explanation for not providing complete and accurate information.

(c) Absent gross negligence or willfulness, an incomplete or inaccurate oral statement normally will not be subject to enforcement action unless it involves significant information provided by an official of a DOE contractor. However, enforcement action may be taken for an unintentionally incomplete or inaccurate oral statement provided to DOE by an official of a DOE contractor or others on behalf of the DOE contractor, if a record was made of the oral information and provided to the DOE contractor thereby permitting an opportunity to correct the oral information, such as if a transcript of the communication or meeting summary containing the error was made available to the DOE contractor and was not subsequently corrected in a timely manner.

(d) When a DOE contractor has corrected inaccurate or incomplete information, the decision to issue a citation for the initial inaccurate or incomplete information normally will be dependent on the circumstances, including the ease of detection of the error, the timeliness of the correction, whether DOE or the DOE contractor identified the problem with the communication, and whether DOE relied on the information prior to the correction. Generally, if the matter was promptly identified and corrected by the DOE contractor prior to reliance by DOE, or before DOE raised a question about the information, no enforcement action will be taken for the initial inaccurate or incomplete information. On the other hand, if the misinformation is identified after DOE relies on it, or after some question is raised regarding the accuracy of the information, then some enforcement action normally will be taken even if it is in fact corrected.

(e) If the initial submission was accurate when made but later turns out to be erroneous because of newly discovered information or advances in technology, a citation normally would not be appropriate if, when the new information became available, the initial submission was promptly corrected.

(f) The failure to correct inaccurate or incomplete information that the DOE contractor does not identify as significant normally will not constitute a separate violation. However, the circumstances surrounding the failure to correct may be considered relevant to the determination of enforcement action for the initial inaccurate or incomplete statement. For example, an unintentionally inaccurate or incomplete submission may be treated as a more severe matter if a DOE contractor later determines that the initial submission was in error and does not promptly correct it or if there were clear opportunities to identify the error.

[71 FR 6931, Feb. 9, 2006, as amended at 74 FR 66033, Dec. 14, 2009; 79 FR 20, Jan. 2, 2014; 81 FR 41795, June 28, 2016; 81 FR 96352, Dec. 30, 2016; 83 FR 1292, Jan. 11, 2018; 83 FR 66084, Dec. 26, 2018; 85 FR 831, Jan. 8, 2020; 86 FR 2956, Jan. 14, 2021; 87 FR 1064, Jan. 10, 2022; 88 FR 2194, Jan. 13, 2023; 88 FR 41294, June 26, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024]

PART 860 TRESPASSING ON DEPARTMENT OF ENERGY PROPERTY

Authority: Sec. 161, 68 Stat. 948, sec. 229, 70 Stat. 1070; (42 U.S.C. 2201; 2278a); sec. 104, 88 Stat. 1237, sec. 105, 88 Stat. 1238 (42 U.S.C. 5814, 5815); sec. 5, Pub. L. 100-185, 101 Stat. 1279 (18 U.S.C. 3559); sec. 6, Pub. L. 100-185, 101 Stat. 1280 (18 U.S.C. 3571); sec. 7041, Pub. L. 100-690, 102 Stat. 4899 (18 U.S.C. 3559).

Source: 58 FR 47985, Sept. 14, 1993, unless otherwise noted.

§ 860.1 Purpose.

The regulations in this part are issued for the protection and security of facilities, installations and real property subject to the jurisdiction or administration, or in the custody of, the Department of Energy.

§ 860.2 Scope.

The regulations in this part apply to all facilities, installations and real property subject to the jurisdiction or administration of the Department of Energy or in its custody which have been posted with a notice of the prohibitions and penalties set forth in this part.

§ 860.3 Trespass.

Unauthorized entry upon any facility, installation or real property subject to this part is prohibited.

§ 860.4 Unauthorized introduction of weapons or dangerous materials.

Unauthorized carrying, transporting, or otherwise introducing or causing to be introduced any dangerous weapon, explosive, or other dangerous instrument or material likely to produce substantial injury or damage to persons or property, into or upon any facility, installation or real property subject to this part, is prohibited.

§ 860.5 Violations and penalties.

(a) Whoever willfully violates either § 860.3 or § 860.4 shall, upon conviction, be guilty of an infraction punishable by a fine of not more than $5,000.

(b) Whoever willfully violates either § 860.3 or § 860.4 with respect to any facility, installation or real property enclosed by a fence, wall, floor, roof, or other structural barrier shall upon conviction, be guilty of a Class A misdemeanor punishable by a fine not to exceed $100,000 or imprisonment for not more than one year, or both.

§ 860.6 Posting.

Notices stating the pertinent prohibitions of §§ 860.3 and 860.4 and penalties of § 860.5 will be conspicuously posted at all entrances of each designated facility, installation or parcel of real property and at such intervals along the perimeter as will provide reasonable assurance of notice to persons about to enter.

§ 860.7 Effective date of prohibition on designated locations.

The prohibitions in §§ 860.3 and 860.4 shall take effect as to any facility, installation or real property on publication in the Federal Register of the notice designating the facility, installation or real property and posting in accordance with § 860.6.

§ 860.8 Applicability of other laws.

Nothing in this part shall be construed to affect the applicability of the provisions of State or other Federal laws.

861 PART 861 [RESERVED]

PART 862 RESTRICTIONS ON AIRCRAFT LANDING AND AIR DELIVERY AT DEPARTMENT OF ENERGY NUCLEAR SITES

Authority: 42 U.S.C. 2201(b), 2201(i) and 2278(a).

Source: 52 FR 29838, Aug. 12, 1987, unless otherwise noted.

§ 862.1 Purpose.

The purpose of this part is to set forth Department of Energy, hereinafter “DOE”, security policy regarding aircraft and air delivery on nuclear sites under the jurisdiction of DOE pursuant to the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.).

§ 862.2 Scope.

(a) This part applies to all persons or aircraft entering or otherwise within or above areas within the boundaries of lands or waters subject to the jursidiction, administration, or in the custody of the DOE at sites designated by DOE.

(b) This part is not applicable to:

(1) Aircraft operating pursuant to official business of the Federal Government;

(2) Aircraft over-flying or in the process of landing pursuant to official business of a state or local law enforcement authority with prior notification to DOE; or

(3) Aircraft in the process of landing on a DOE site due to circumstances beyond the control of the operator and with prior notification to DOE, if possible.

(c) Aircraft in paragraphs (b)(2) and (b)(3) of this section are within the scope of this part upon landing at a DOE designated site.

§ 862.3 Definitions.

(a) Air delivery. Delivering or retrieving a person or object by airborne means, including but not limited to, aircraft.

(b) Aircraft. A manned a unmanned device or any portion thereof, that is commonly used or intended to be used for flight in the air, including powerless flight. Such devices include but are not limited to any parachute, hovercraft, helicopter, glider, airplane or lighter than air vehicle.

(c) Boundary. A delineation on a map of Federal interest in land or water utilized by DOE pursuant to the Atomic Energy Act of 1954, as amended:

(1) Authorized by Congress, or

(2) Published pursuant to law in the Federal Register, or

(3) Filed or recorded with a State or political subdivision in accordance with applicable law.

(d) Designated site. An area of land or water identified in accordance with § 862.7 of this part.

(e) Downed aircraft. An aircraft that is on a designated site due to emergency landing or for any other reason.

(f) Manager of Operations. The manager of a DOE field office, the Manager of the Pittsburgh Naval Reactors Office, the Manager of the Schnectady Naval Reactors Office and, for designated sites administered directly by DOE Headquarters, the Chief Health, Safety and Security Officer.

[52 FR 29838, Aug. 12, 1987, as amended at 71 FR 68734, Nov. 28, 2006]

§ 862.4 Prohibitions and penalties.

(a) The following activities are prohibited by his part:

(1) Operation or use of aircraft on lands or waters of designated sites.

(2) Air delivery to or from designated sites.

(3) Removal or movement of downed aircraft, or participation in the removal or movement of downed aircraft, from or on a designated site unless prior authorization is obtained pursuant to § 862.5 of this part.

(4) Failure to remove a downed aircraft from a designated site in accordance with an order issued by the cognizant DOE Manager of Operations under § 862.5 of this part.

(5) Violation of Federal Aviation Administration regulations regarding minimum altitudes and prohibited flight maneuvers over a designated site.

(b) A person willfully engaging in activities prohibited by this part may be subject to the imposition of criminal penalties set forth in sections 223 and 229 of the Atomic Energy Act, as amended (42 U.S.C. 2273 and 2278(a)).

§ 862.5 Procedures for removal of downed aircraft.

(a) An aircraft on or brought on to a designated site, except as provided in § 862.2 (b)(1), shall not be moved within or removed from such areas except as provided for in this section. All such aircraft are subject to full inspection by DOE security personnel upon landing upon order of the Manager of Operations or his designee. Any attempt to depart or remove the aircraft from a designated site without clearance obtained pursuant to this section, may be assumed to be indicative of hostile intent by security forces at such sites.

(b)(1) The cognizant DOE Manager of Operations for a designated site may, on his own initiative, issue a written order to the owner or operator of a downed aircraft to require the removal of that aircraft from the site within 20 days of this notice. Such an order shall specify:

(i) The date upon which removal operations must be completed;

(ii) The times and means of access to and from the downed aircraft to be removed;

(iii) The manner of removal; and

(iv) An estimate of the cost of removal to DOE for which the owner or operator will be held liable if removal is accomplished by DOE.

(2) The owner or operator of the downed aircraft may file a written petition, supported by affidavits, to the cognizant Manager of Operations requesting that the order be modified or set aside. The petition may be granted by the Manager of Operations for good cause shown, upon a finding that it is clearly consistent with the national security, public safety, and federal property interests. Such petition must be filed at least 10 days prior to the date upon which removal is to be initiated, as specified in the order. The written decision of the Manager of Operations shall be a final agency action.

(c)(1) The owner of a downed aircraft may petition the cognizant Manager of Operations of permission to move or remove the downed aircraft from or within a designated site. The petition must provide assurances that the owner will fully compensate DOE for all costs incurred or damages experienced as a result of landing or removal through a contact for services. The Manager of Operations may, for good cause shown, waive part or all of the compensation which might otherwise be due DOE.

(2) The Manager of Operations may deny such petition in whole or part and prohibit removal of a downed aircraft upon finding that:

(i) The removal of a downed aircraft would create an unacceptable safety or security risk;

(ii) The removal of a downed aircraft would result in excessive resource loss of property damage or an unacceptable disruption of federal activities;

(iii) The removal of downed aircraft is impracticable or impossible;

(iv) The owner has failed to provide adequate assurances that all costs incurred or damages experienced by DOE due to landing or removal of aircraft will be fully paid immediately upon removal by the owner under a contract for services;

(v) An inspection of the aircraft has not been conducted by DOE security personnel.

(3) In the event that such petition is granted in whole or part, the cognizant Manager of Operations may issue an order, as set forth in (b)(1) (i) through (iv) of this section. In the event that a petition is denied in whole or part, the Manager of Operations shall issue a written decision which shall set forth the reasons for such denial.

(d) Failure to comply with an order issued by the Manager of Operations pursuant to this section is basis for DOE to consider the downed aircraft to be abandoned property. DOE may take whatever measures it deems necessary when it determines that downed aircraft is abandoned property.

(e) Notwithstanding paragraphs (b) and (c) of this section, the Manager of Operations may move or remove a downed aircraft from such an area upon oral or written notification to the owner or operator of such aircraft upon a finding that national security or operational requirements necessitate expedited movement or removal. The owner or operator may be held jointly and separately liable for all expenses incurred by DOE in the movement or removal of such aircraft. Such expenses shall be deemed to be incurred through an implied contract at law for services.

§ 862.6 Voluntary minimum altitude.

In addition to complying with all applicable FAA prohibitions or restrictions, aircraft are requested to maintain a minimum altitude of 2,000 feet above the terrain of a designated site. Applicable FAA prohibitions or restrictions take precedence over this voluntary minimum altitude.

§ 862.7 Designation of sites.

(a) DOE shall designate sites covered by this part as deemed necessary, consistent with the national security and public safety, through notice in the Federal Register.

(b) This part shall be effective as to any facility, installation, or real property on publication in the Federal Register of the notice designating the site.

(c) Upon designation of a site, the cognizant Manager of Operations may inform the public of such designation through press release or posting of notice at airfields in the vicinity of the designated site.

PART 871 AIR TRANSPORTATION OF PLUTONIUM

Authority: Pub. L. 94-187, 88 Stat. 1077, 1078 (42 U.S.C. 2391 et seq.); Energy Reorganization Act, Pub. L. 93-438, 88 Stat. 1233 (42 U.S.C. 5801 et seq.); secs. 2, 3, 91, 123, and 161 of the Atomic Energy Act of 1954, as amended.

Source: 42 FR 48332, Sept. 23, 1977, unless otherwise noted.

§ 871.1 National security exemption.

(a) The following DOE air shipments of plutonium are considered as being made for the purposes of national security within the meaning of section 502(2) of Public Law 94-187:

(1) Shipments made in support of the development, production, testing, sampling, maintenance, repair, modification, or retirement of atomic weapons or devices;

(2) Shipments made pursuant to international agreements for cooperation for mutual defense purposes; and

(3) Shipments necessary to respond to an emergency situation involving a possible threat to the national security.

(b) The Deputy Administrator for Defense Programs may authorize air shipments falling within paragraph (a)(1) of this section, on a case-by-case basis: Provided, That the Deputy Administrator for Defense Programs determines that such shipment is required to be made by aircraft either because:

(1) The delay resulting from using ground transportation methods would have serious adverse impact upon a national security requirement;

(2) Safeguards or safety considerations dictate the use of air transportation;

(3) The nature of the item to be shipped necessitates the use of air transportation in order to avoid possible damage which may be expected from other available transportation environments; or

(4) The nature of the item being shipped necessitates rapid shipment by air in order to preserve the chemical, physical, or isotopic properties of the item.

The Deputy Administrator for Defense Programs may also authorize air shipments falling within paragraph (a)(2) of this section in all cases since the inherent time delays of surface transportation for such shipments are considered unacceptable. The Deputy Administrator for Defense Programs may also authorize air shipments falling within paragraph (a)(3) of this section in cases where failure to make shipments by air could jeopardize the national security of the United States.

[42 FR 48332, Sept. 23, 1977, as amended at 71 FR 68734, Nov. 28, 2006]

§ 871.2 Public health and safety exemption.

The Deputy Administrator for Defense Programs may authorize, on a case-by-case basis, DOE air shipments of plutonium where the Deputy Administrator determines that rapid shipment by air is required to respond to an emergency situation involving possible loss of life, serious personal injuries, considerable property damage, or other significant threat to the public health and safety.

[42 FR 48332, Sept. 23, 1977, as amended at 71 FR 68734, Nov. 28, 2006]

§ 871.3 Records.

Determinations made by the Deputy Administrator for Defense Programs pursuant to these rules shall be matters of record. Such authorizations shall be reported to the Administrator of the National Nuclear Security Administration within twenty-four hours after authorization is granted.

[42 FR 48332, Sept. 23, 1977, as amended at 71 FR 68734, Nov. 28, 2006]

§ 871.4 Limitation on redelegation of authority.

The authority delegated in this part may not be redelegated without the prior approval of the Administrator of the National Nuclear Security Administration.

[42 FR 48332, Sept. 23, 1977, as amended at 71 FR 68734, Nov. 28, 2006]

PART 900 COORDINATION OF FEDERAL AUTHORIZATIONS FOR ELECTRIC TRANSMISSION FACILITIES

Authority: 16 U.S.C. 824p(h).

Source: 89 FR 35367, May 1, 2024, unless otherwise noted.

§ 900.1 Purpose and scope.

(a) Pursuant to section 216(h) of the Federal Power Act (16 U.S.C. 824p(h)), the Department of Energy (DOE) establishes the Coordinated Interagency Transmission Authorizations and Permits Program (CITAP Program) under this part to coordinate the review and processes related to Federal authorizations necessary to site a proposed electric transmission facility. Pursuant to section 216(h)(4)(A), this part establishes the mechanism by which DOE will set prompt and binding intermediate milestones and ultimate deadlines for the processes related to deciding whether to issue such authorizations. In addition, as the lead agency and in collaboration with any National Environmental Policy Act (NEPA) joint lead agency and in consultation with the relevant Federal entities, as applicable, DOE will prepare a single environmental review document, which will be designed to serve the needs of all relevant Federal agencies and inform all Federal authorization decisions on the proposed electric transmission project.

(b) This part provides a process for the timely submission of information needed for Federal decisions related to authorizations for siting proposed electric transmission projects. This part seeks to ensure that these projects are developed consistent with the nation's environmental laws, including laws that address endangered and threatened species, critical habitats, and cultural and historic properties. This part provides a framework, called the Integrated Interagency Pre-Application (IIP) Process, by which DOE will coordinate submission of materials necessary for Federal authorizations and related environmental reviews required under Federal law to site proposed electric transmission facilities, and integrates the IIP Process into the CITAP Program.

(c) This part describes the timing and procedures for the IIP Process, which should be initiated prior to a project proponent's submission of any application for a required Federal authorization. The IIP Process provides for timely and focused pre-application meetings with relevant Federal and non-Federal entities. In addition, the IIP Process facilitates early identification of potential siting constraints and opportunities. The IIP Process promotes thorough and consistent stakeholder engagement by a project proponent. At the close-out of each IIP Process, DOE will establish the schedule for all Federal reviews and authorizations required to site a proposed electric transmission facility, in coordination with the relevant Federal entities.

(d) This part improves the Federal permitting process by facilitating the early submission, compilation, and documentation of information needed for coordinated review by relevant Federal entities under the National Environmental Policy Act (42 U.S.C. 4321 et seq.). This part also facilitates expeditious action on necessary Federal authorizations by ensuring that relevant Federal entities coordinate their consideration of those applications and by providing non-Federal entities the opportunity to coordinate their non-Federal permitting and environmental reviews with the reviews of the relevant Federal entities.

(e) This part facilitates improved and earlier coordination of and consultation between relevant Federal entities, relevant non-Federal entities, and others pursuant to section 106 of the National Historic Preservation Act (54 U.S.C. 306108) (NHPA) and its implementing regulations found at 36 CFR part 800. Under this part, DOE may determine it has an undertaking with the potential to affect historic properties and may, at that time, authorize a project proponent, as a CITAP applicant, to initiate section 106 consultation for the undertaking consistent with 36 CFR 800.2(c)(4). Prior to that determination, this part requires project proponents to gather initial information and make recommendations relevant to the section 106 process to the extent possible. This part also establishes DOE as lead for the section 106 process, consistent with DOE's role as lead or joint lead agency for purposes of NEPA, in order to maximize opportunities for coordination between the NEPA and section 106 processes. Federal entities remain responsible for government-to-government consultation with Indian Tribes (and government-to-sovereign consultation in the context of Native Hawaiian relations) and for any findings and determinations required by and reserved to Federal agencies in 36 CFR part 800.

(f) This part applies only to qualifying projects as defined by § 900.2.

(g) Participation in the IIP Process does not alter any requirements to obtain necessary Federal authorizations for proposed electric transmission projects. Nor does this part alter any responsibilities of the relevant Federal entities for environmental review or consultation under applicable law.

(h) The Director may waive any requirement imposed on a project proponent under this part if, in the Director's discretion, the Director determines that the requirement is unnecessary, duplicative, or impracticable under the circumstances relevant to the proposed electric transmission project. Where the principal project developer is itself a Federal entity that would be otherwise expected to prepare an environmental review document for the project, the Director shall consider modifications to the requirements under this part as may be necessary under the circumstances.

§ 900.2 Definitions.

As used in this part:

Analysis area means a geographical area established for a resource report at the IIP Process initial meeting and modified at the IIP Process review meeting, if applicable.

Authorization means any license, permit, approval, finding, determination, or other administrative decision required under Federal, Tribal, State, or local law to site a proposed electric transmission facility, including special use authorization, certifications, opinions, or other approvals.

Communities of Interest means the following communities that could be affected by a proposed electric transmission project: disadvantaged communities; rural communities; Tribal communities; indigenous communities; geographically proximate communities; communities with environmental justice concerns; and energy communities.

Director means the Director of the DOE Grid Deployment Office, that person's delegate, or another DOE official designated to perform the functions of this part by the Secretary of Energy.

Federal authorization means any authorization required under Federal law.

Federal entity means any Federal agency or department.

Indian Tribe has the same meaning as provided by 25 U.S.C. 5304(e).

Mitigation approach means an approach that applies a conceptual plan to identify appropriate measures to avoid, minimize, or compensate for potential impacts to resources from a proposed electric transmission project, consistent with 40 CFR 1508.1(s) or any successor regulation. A mitigation approach identifies the needs and baseline conditions of targeted resources, potential impacts from the proposed project, cumulative impacts of past and reasonably foreseeable future disturbances to those resources, and future disturbance trends, then uses this information to identify priorities for measures across the relevant area. Such an approach includes full consideration of the conditions of additionality (meaning that the benefits of a compensatory mitigation measure improve upon the baseline conditions in a manner that is demonstrably new and would not have occurred without the mitigation measure) and durability (meaning that the effectiveness of a mitigation measure is sustained for the duration of the associated direct and indirect impacts).

MOU signatory agency means a Federal entity that has entered into the currently effective memorandum of understanding (MOU) under section 216(h)(7)(B)(i) of the Federal Power Act, such as the interagency MOU executed in May 2023, titled “Memorandum of Understanding among the U.S. Department of Agriculture, Department of Commerce, Department of Defense, Department of Energy, the Environmental Protection Agency, the Council on Environmental Quality, the Federal Permitting Improvement Steering Council, Department of the Interior, and the Office of Management and Budget Regarding Facilitating Federal Authorizations for Electric Transmission Facilities.”

NEPA joint lead agency means the Federal entity designated under § 900.11.

Non-Federal entity means an Indian Tribe, multi-State governmental entity, State agency, or local government agency.

Participating agencies means:

(1) The Department of Agriculture (USDA);

(2) The Department of Commerce;

(3) The Department of Defense (DOD);

(4) The Department of Energy;

(5) The Environmental Protection Agency (EPA);

(6) The Council on Environmental Quality;

(7) The Office of Management and Budget;

(8) The Department of the Interior (DOI);

(9) The Federal Permitting Improvement Steering Council (FPISC);

(10) Other agencies and offices as the Secretary of Energy may from time to time invite to participate; and

(11) The following independent agencies, to the extent consistent with their statutory authority and obligations, and determined by the chair or executive director of each agency, as appropriate:

(i) The Federal Energy Regulatory Commission (FERC); and

(ii) The Advisory Council on Historic Preservation.

Potentially affected landowner means an owner of a real property interest that is potentially affected directly (e.g., crossed or used) or indirectly (e.g., changed in use) by a project right-of-way, potential route, or proposed ancillary or access site, as identified in § 900.6.

Project area means the area located between the two end points of the proposed electric transmission facility containing the study corridors selected by the project proponent for in-depth consideration for the proposed project and the immediate surroundings of the end points of the proposed facility. The project area does not necessarily coincide with “permit area,” “area of potential effect,” “action area,” or other terms specific to a certain type of regulatory review.

Project proponent means a person or entity who initiates the IIP Process in anticipation of seeking a Federal authorization for a proposed electric transmission project.

Qualifying project means:

(1) A proposed electric transmission line and its attendant facilities:

(i) That will either be a high-voltage (230 kV or above) line or a regionally or nationally significant line, as determined by DOE based upon relevant factors, including but not limited to, reduction in congestion costs for generating and delivering energy, mitigation of weather and variable generation uncertainty, and enhanced diversity of supply;

(ii) Which is expected to be used, in whole or in part, for the transmission of electric energy in interstate or international commerce for sale at wholesale;

(iii) Which is expected to require preparation of an environmental impact statement (EIS) pursuant to NEPA to inform an agency decision on a Federal authorization;

(iv) Which is not proposed for authorization under section 8(p) of the Outer Continental Shelf Lands Act (43 U.S.C. 1337(p));

(v) Which is not seeking a construction or modification permit from FERC pursuant to section 216(b) of the Federal Power Act (16 U.S.C. 824p(b)); and

(vi) Which will not be wholly located within the Electric Reliability Council of Texas interconnection; or

(2) Any other proposed electric transmission facility that is approved by the Director under the process set out in § 900.3.

Relevant Federal entity means a Federal entity with jurisdictional interests that may have an effect on a proposed electric transmission project, that is responsible for issuing a Federal authorization for the proposed project, that has relevant expertise with respect to environmental and other issues pertinent to or potentially affected by the proposed project, or that provides funding for the proposed project. The term includes participating agencies. The term includes a Federal entity with either permitting or non-permitting authority; for example, those entities with which consultation or review must be completed before a project may commence, such as DOD for an examination of military test, training, or operational impacts.

Relevant non-Federal entity means a non-Federal entity with relevant expertise or jurisdiction within the project area, that is responsible for issuing an authorization for the proposed electric transmission project, that has relevant expertise with respect to environmental and other issues pertinent to or potentially affected by the proposed project, or that provides funding for the proposed project. The term includes an entity with either permitting or non-permitting authority, such as an Indian Tribe, Native Hawaiian Organization, or State or Tribal Historic Preservation Office with whom consultation must be completed in accordance with section 106 of the NHPA prior to approval of a permit, right-of-way, or other authorization required for a Federal authorization.

Route means an area along a linear path within which a proposed electric transmission facility could be sited that is:

(1) Wide enough to allow minor adjustments in the alignment of the proposed facility to avoid sensitive features or to accommodate potential engineering constraints; and

(2) Narrow enough to allow detailed study.

Stakeholder means any relevant non-Federal entity, interested non-governmental organization, potentially affected landowner, or other interested person or organization.

Study corridor means a contiguous area (not to exceed one mile in width) within the project area where potential routes or route segments may be considered for further study. A study corridor does not necessarily coincide with “permit area,” “area of potential effect,” “action area,” or other defined terms of art that are specific to types of regulatory review.

§ 900.3 Applicability to other projects.

(a) Following the procedures set out in this section, the Director may determine that a proposed electric transmission facility that does not meet the description of a qualifying project under paragraph (1) of the definition in § 900.2 is a qualifying project under paragraph (2) of the definition.

(b) A requestor seeking DOE assistance under this part for a proposed electric transmission facility that does not meet the description of a qualifying project under paragraph (1) of the definition in § 900.2 must file a request for coordination with the Director. The request must contain:

(1) The legal name of the requester; its principal place of business; and the name, title, and mailing address of the person or persons to whom communications concerning the request for coordination are to be addressed;

(2) A concise description of the proposed facility sufficient to explain its scope and purpose;

(3) A list of anticipated relevant Federal entities involved in the proposed facility; and

(4) A list of anticipated relevant non-Federal entities involved in the proposed facility, including any agency serial or docket numbers for pending applications.

(c) Not later than 30 calendar days after the date that the Director receives a request under this section, the Director, in consultation with the relevant Federal entities, will determine if the proposed electric transmission facility is a qualifying project under this part and will notify the project proponent in writing of one of the following:

(1) If accepted, that the proposed facility is a qualifying project and the project proponent must submit an initiation request as set forth under § 900.5; or

(2) If not accepted, that the proposed facility is not a qualifying project, a justification of that determination, and an indication that the project proponent must follow the procedures of each relevant Federal entity that has jurisdiction over the proposed facility without DOE performing a coordinating function.

(d) In making the determination whether a proposed electric transmission facility is a qualifying project, the Director may consider:

(1) Whether the proposed facility would benefit from CITAP Program coordination;

(2) Whether the proposed facility would result in reduced congestion costs for generating and delivering energy;

(3) Whether the proposed facility would result in mitigation of weather and variable generation uncertainty;

(4) Whether the proposed facility would result in an enhanced diversity of supply; and

(5) Any other relevant factors, as determined by the Director.

(e) For a proposed facility that is seeking a construction or modification permit pursuant to section 216(b) of the Federal Power Act, DOE may only consider a request for assistance under this section if the request under paragraph (b) of this section is consistent with Delegation Order No. S1-DEL-FERC-2006 or any similar, subsequent delegation that the Secretary may order.

(f) At the discretion of the MOU signatory agencies, this section may be applied to a proposed electric transmission facility proposed for authorization under section 8(p) of the Outer Continental Shelf Lands Act, if the proposed authorization is independent of any generation project.

(g) This section does not apply to:

(1) A proposed electric transmission facility proposed to be authorized under section 8(p) of the Outer Continental Shelf Lands Act in conjunction with a generation project; or

(2) A proposed electric transmission facility wholly located within the Electric Reliability Council of Texas interconnection.

§ 900.4 Purpose and scope of IIP Process.

(a) The Integrated Interagency Pre-Application (IIP) Process is intended for a project proponent who has identified potential study corridors or potential routes and the proposed locations of any intermediate substations for a proposed electric transmission project. To the extent possible, the project proponent should use the following criteria to identify potential study corridors and potential routes:

(1) Potential environmental, visual, historic, cultural, economic, social, or health effects or harm based on the proposed project or proposed siting, and anticipated constraints (for instance, pole height and corridor width based on line capacity to improve safety and resiliency of the project);

(2) Potential cultural resources, sacred sites, and historic properties that may be eligible for or listed in the National Register of Historic Places;

(3) Areas under (or potentially under) special protection by State or Federal statute and areas subject to a Federal entity or non-Federal entity decision that could potentially increase the time needed for project evaluation and siting a transmission line route. Such areas may include, but are not limited to, properties or sites that may be of traditional religious or cultural importance to Indian Tribes, National Scenic and Historic Trails, National Landscape Conservation System units managed by the Bureau of Land Management (BLM), Land and Water Conservation Fund lands, National Wildlife Refuges, national monuments, National Historic Landmarks, units of the National Park System, national marine sanctuaries, and marine national monuments;

(4) Opportunities to site potential routes through designated corridors, previously disturbed lands, and lands with existing infrastructure as a means of potentially reducing impacts and known conflicts as well as the time needed for affected Federal land managers to evaluate an application for a Federal authorization if the route is sited through such areas (e.g., colocation with existing infrastructure or location on previously disturbed lands, in energy corridors designated by the Department of the Interior or the Department of Agriculture under section 503 of the Federal Land Policy and Management Act (Pub. L. 94-579) or section 368 of the Energy Policy Act of 2005 (Pub. L. 109-58), existing rights-of-way, National Interest Electric Transmission Corridors designated under Federal Power Act section 216(a), or utility corridors identified in a land management plan);

(5) Potential constraints caused by impacts on military test, training, and operational missions, including impacts on installations, ranges, and airspace;

(6) Potential constraints caused by impacts on the United States' aviation system;

(7) Potential constraints caused by impacts to navigable waters of the United States; and

(8) Potential avoidance, minimization, offsetting, and compensatory (onsite and offsite) measures, developed through a mitigation approach to reduce or offset the potential impact of the proposed project to resources requiring mitigation.

(b) Participation in the IIP Process is a prerequisite for the coordination provided by DOE between relevant Federal entities, relevant non-Federal entities, and the project proponent.

(c) The IIP Process ensures early interaction between the project proponents, relevant Federal entities, and relevant non-Federal entities to enhance early understanding by those entities. Through the IIP Process, the project proponent will provide relevant Federal entities and relevant non-Federal entities with a clear description of the proposed electric transmission project, the project proponent's siting process, and the environmental and community setting being considered by the project proponent for siting the proposed electric transmission facility; and will coordinate with relevant Federal entities to develop resource reports that will serve as inputs, as appropriate, into the relevant Federal analyses and facilitate early identification of project issues.

(d) The IIP Process is an iterative process anchored by three meetings: the initial meeting, review meeting, and close-out meeting. These meetings, defined in §§ 900.5, 900.8 and 900.9, are milestones in the process and do not preclude any additional meetings or communications between the project proponent and the relevant Federal entities. The iterative nature of the process is provided for in procedures for evaluating the completeness of submitted materials and the suitability of materials for the relevant Federal entities' decision-making before each milestone.

(e) DOE, in exercising its responsibilities under this part, will communicate regularly with FERC, electric reliability organizations and electric transmission organizations approved by FERC, relevant Federal entities, and project proponents. DOE will use information technologies to provide opportunities for relevant Federal entities to participate remotely.

(f) DOE, in exercising its responsibilities under this part, will to the maximum extent practicable and consistent with Federal law, coordinate the IIP Process with any relevant non-Federal entities. DOE will use information technologies to provide opportunities and reduce burdens for relevant non-Federal entities to participate remotely.

(g) The Director may at any time require the project proponent to provide additional information necessary to resolve issues raised by the IIP Process.

(h) Pursuant to 10 CFR 1004.11, any person submitting information during the IIP Process that the person believes to be confidential and exempt by law from public disclosure should submit two well-marked copies, one marked “confidential” that includes all the information believed to be confidential, and one marked “non-confidential” with the information believed to be confidential deleted or redacted. DOE will make its own determination about the confidential status of the information and treat it according to its determination, in accordance with applicable law. The project proponent must request confidential treatment for all material filed with DOE containing non-public location, character, and ownership information about cultural resources.

(i) Pursuant to 10 CFR 1004.13, any person submitting information during the IIP Process that the person believes might contain Critical Electric Infrastructure Information (CEII) should submit a request for CEII designation of information.

§ 900.5 Initiation of IIP Process.

(a) Initiation request. A project proponent shall submit an initiation request to DOE. The project proponent may decide when to submit the initiation request. The initiation request must include, based on best available information:

(1) A summary of the proposed electric transmission project, as described by paragraph (b) of this section;

(2) Associated maps, geospatial information, and studies (provided in electronic format), as described by paragraph (c) of this section;

(3) A project participation plan, as described by paragraph (d) of this section; and

(4) A statement regarding the proposed project's status pursuant to Title 41 of the Fixing America's Surface Transportation Act (FAST-41) (42 U.S.C. 4370m-2(b)(2)), as described by paragraph (e) of this section.

(b) Summary of the proposed project. The summary of the proposed electric transmission project may not exceed 10 single-spaced pages unless the project proponent requests a waiver of the page limit, including a rationale for the waiver, and DOE grants the waiver. The summary must include:

(1) The following information:

(i) The project proponent's legal name and principal place of business;

(ii) The project proponent's contact information and designated point(s) of contact;

(iii) Whether the project proponent is an individual, partnership, corporation, or other entity and, if applicable, the State laws under which the project proponent is organized or authorized; and

(iv) If the project proponent resides or has its principal office outside the United States, documentation related to designation by irrevocable power of attorney of an agent residing within the United States;

(2) A statement of the project proponent's interests and objectives;

(3) To the extent available, copies of or links to:

(i) Any regional electric transmission planning documents, regional reliability studies, regional congestion or other related studies that relate to the proposed project or the need for the proposed project; and

(ii) Any relevant interconnection requests;

(4) A description of potential study corridors and routes identified by the project proponent and a brief description of the evaluation criteria and methods used by the project proponent to identify and develop those corridors and routes;

(5) A brief description of the proposed project, including end points, voltage, ownership, intermediate substations if applicable, and, to the extent known, any information about constraints or flexibility with respect to the proposed project;

(6) Identification of any environmental and engineering firms and sub-contractors under contract to develop the proposed project;

(7) The project proponent's proposed schedule for filing necessary Federal and State applications, construction start date, and planned in-service date, assuming receipt of all necessary authorizations; and

(8) A list of anticipated relevant Federal entities and relevant non-Federal entities, including contact information for each Federal agency, State agency, Indian Tribe, or multi-State entity that is responsible for or has a role in issuing an authorization or environmental review for the proposed project.

(c) Maps, geospatial information, and studies. The initiation request must include maps, geospatial information, and studies in support of the information provided in the summary of the proposed project under paragraph (b) of this section. Maps must be of sufficient detail to identify the study corridors and potential routes. Project proponents must provide the maps, information, and studies as electronic data files that may be readily accessed by relevant Federal entities and relevant non-Federal entities. The maps, information, and studies described in this paragraph (c) must include:

(1) Location maps and plot plans to scale showing all major components, including a description of zoning and site availability for any permanent facilities; cultural resource location information in these materials should be submitted in accordance with § 900.4(h);

(2) A map of the project area showing potential study corridors and potential routes;

(3) Existing data or studies relevant to the summary of the proposed project; and

(4) Citations identifying sources, data, and analyses used to develop the summary of the proposed project.

(d) Project participation plan. The project participation plan, which may not exceed 10, single-spaced pages, summarizes the outreach that the project proponent conducted prior to submission of the initiation request, and describes the project proponent's planned outreach to communities of interest going forward. A supplemental appendix may be submitted to provide sufficient detail in addition to the narrative elements. The project participation plan must include:

(1) A summary of prior outreach to communities of interest and stakeholders including:

(i) A description of what work already has been done, including stakeholder and community outreach and public engagement, as well as any entities and organizations interested in the proposed electric transmission project;

(ii) A list of environmental, engineering, public affairs, other contractors or consultants employed by the proponent to facilitate public outreach;

(iii) A description of any materials provided to the public, such as environmental surveys or studies;

(iv) A description of the communities of interest identified and the process by which they were identified;

(v) A general description of the real property interests that would be impacted by the proposed project and the rights that the owners of those property interests would have under State law; and

(vi) A summary of comments received during these previous engagement activities, issues identified by stakeholders, communities of interest (including various resource issues, differing project alternative study corridors or routes, and revisions to routes), and responses provided to commenters, if applicable; and

(2) A public engagement plan, which must:

(i) Describe the project proponent's outreach plan and status of those activities, including planned future activities corresponding to each of the items or issues identified in paragraphs (d)(1)(i) through (vi) of this section, specifying the planned dates or frequency;

(ii) Describe the manner in which the project proponent will reach out to communities of interest about potential mitigation of concerns;

(iii) Describe planned outreach activities during the permitting process, including efforts to identify, and engage, individuals with limited English proficiency and linguistically isolated communities, and provide accommodations for individuals with accessibility needs; and

(iv) Discuss the specific tools and actions used by the project proponent to facilitate public communications and public information, including whether the project proponent will have a readily accessible, easily identifiable, single point of contact.

(e) FAST-41 statement. The FAST-41 statement required under paragraph (a) of this section must specify the status of the proposed electric transmission project pursuant to FAST-41 at the time of submission of the initiation request. The statement must either:

(1) State that the project proponent has sought FAST-41 coverage pursuant to 42 U.S.C. 4370m-2(a)(1); and state whether the Executive Director of the FPISC has created an entry on the Permitting Dashboard for the project as a covered project pursuant to 42 U.S.C. 4370m-2(b)(2)(A); or

(2) State that the project proponent elected not to apply to be a FAST-41 covered project at this time.

(f) Initiation request determination. Not later than 20 calendar days after the date that DOE receives an initiation request, DOE shall:

(1) Determine whether the initiation request meets the requirements of this section and, if not previously determined under § 900.3, whether the proposed electric transmission facility is a qualifying project;

(2) Identify the relevant Federal entities and relevant non-Federal entities and provide each with an electronic copy of the initiation request; and

(3) Give notice to the project proponent and relevant Federal and non-Federal entities of DOE's determinations under paragraph (f)(1) of this section.

(g) Deficiencies. If DOE determines under paragraph (f)(1) of this section that the initiation request does not meet the requirements of this section, DOE must provide the reasons for that finding and a description of how the project proponent may, if applicable, address any deficiencies in the initiation request so that DOE may reconsider its determination. If DOE determines under paragraph (f)(1) of this section that the proposed electric transmission facility is not a qualifying project, DOE must provide a justification for the determination and the project proponent may file a request for coordination with the Director as provided in § 900.3. A project to site a proposed electric transmission facility that is not a qualifying project is not eligible for participation in the IIP Process.

(h) Initial meeting. If a project proponent submits a valid initiation request, DOE, in consultation with the identified relevant Federal entities, shall convene the IIP Process initial meeting with the project proponent and all relevant Federal entities notified by DOE under paragraph (f) of this section as soon as practicable and no later than 15 calendar days after the date that DOE provides notice under paragraph (f) that the initiation request meets the requirements of this section. DOE shall also invite relevant non-Federal entities to participate in the initial meeting. During the initial meeting:

(1) DOE and the relevant Federal entities shall discuss with the project proponent the IIP Process, Federal authorization process, related environmental reviews, any arrangements for the project proponent to contribute funds to DOE to cover costs incurred by DOE and the relevant Federal entities in the IIP Process (in accordance with 42 U.S.C. 7278), any requirements for entering into cost recovery agreements, and paying for third-party contractors under DOE's supervision, where applicable;

(2) DOE will identify any Federal applications that must be submitted during the IIP Process, to enable relevant Federal entities to begin work on the review process, and those applications that will be submitted after the IIP Process. All application submittal timelines will be accounted for in the project-specific schedule described in § 900.7;

(3) DOE will establish all analysis areas necessary for the completion of resource reports required under § 900.6;

(4) The project proponent shall describe the proposed electric transmission project and the contents of the initiation request;

(5) DOE and the relevant Federal entities, along with any relevant non-Federal entities who choose to participate, will review the information provided by the project proponent and publicly available information, discuss the study corridors and potential routes identified by the project proponent, discuss the evaluation criteria and methods used to identify those corridors and routes and, to the extent possible and based on agency expertise and experience, identify any additional criteria for adding or modifying potential routes and study corridors;

(6) DOE and the relevant Federal entities will discuss, based on available information provided by the project proponent, any surveys and studies that may be required for potential routes and completion of the resource reports, including biological (including threatened and endangered species or avian, aquatic, and terrestrial species and aquatic habitats of concern), visual, cultural, economic, social, health, and historic surveys and studies.

(i) Feedback to project proponent. Feedback provided to the project proponent under paragraph (h) of this section does not constitute a commitment by any relevant Federal entity to approve or deny a Federal authorization request, nor does the IIP Process limit agency discretion regarding NEPA review.

(j) Draft initial meeting summary. Not later than 10 calendar days after the initial meeting, DOE shall:

(1) Prepare a draft initial meeting summary that includes a summary of the meeting discussion, a description of key issues and information gaps identified during the meeting, and any requests for more information from relevant Federal entities and relevant non-Federal entities; and

(2) Convey the draft summary to the project proponent, relevant Federal entities, and any relevant non-Federal entities that participated in the meeting.

(k) Corrections. The project proponent and entities that received the draft initial meeting summary under paragraph (j) of this section will have 10 calendar days following receipt of the draft initial meeting summary to review the draft and provide corrections to DOE.

(l) Final summary. Not later than 10 calendar days following the close of the 10-day review period under paragraph (k) of this section, DOE shall:

(1) Prepare a final initial meeting summary by incorporating received corrections, as appropriate;

(2) Add the final summary to the consolidated administrative docket described by § 900.10; and

(3) Provide an electronic copy of the summary to all relevant Federal entities, relevant non-Federal entities, and the project proponent.

§ 900.6 Project proponent resource reports.

(a) Preparation and submission. The project proponent shall prepare and submit to DOE the 13 project proponent resource reports described in this section. The project proponent may submit the resource reports at any time before requesting a review meeting under § 900.8 and shall, at the direction of DOE, revise resource reports in response to comments received from relevant Federal entities and relevant non-Federal entities during the Integrated Interagency Pre-Application (IIP) Process.

(b) Content. Each resource report must include concise descriptions, based on the best available scientific and commercial information, of the known existing environment and major site conditions. The detail of each resource report must be commensurate with the complexity of the proposal and its potential for environmental impacts. Each topic in each resource report must be addressed or its omission justified. If any resource report topic is not addressed at the time the applicable resource report is filed or its omission is not addressed, the report must explain why the topic is missing. If material required for one resource report is provided in another resource report or in another exhibit, it may be incorporated by reference. If outside material is reasonably available for review and comment, a resource report may incorporate that material by reference by including a citation to the material and a brief summary of the material. Consistent with §§ 900.1(h) and 900.4(g), the Director may modify the requirements of this section to reflect differences in onshore and offshore environments and uses.

(c) Requirements for IIP Process progression. Failure of the project proponent to provide at least the required initial or revised content will prevent progress through the IIP Process to the IIP Process review or close-out meetings, unless the Director determines that the project proponent has provided an acceptable reason for the item's absence and an acceptable timeline for filing it. Failure to file within the accepted timeline will prevent further progress in the IIP Process.

(d) General requirements. As appropriate, each resource report shall:

(1) Address conditions or resources that might be directly or indirectly affected by the proposed electric transmission project;

(2) Identify environmental effects expected to occur as a result of the proposed project;

(3) Identify the potential effects of construction, operation (including maintenance and malfunctions), and termination of the proposed project, as well as potential cumulative effects resulting from existing or reasonably foreseeable projects;

(4) Identify measures proposed to enhance the environment or to avoid, minimize, or compensate for potential adverse effects of the proposed project; and

(5) Provide a list of publications, reports, and other literature or communications, including agency communications, that were cited or relied upon to prepare each report.

(e) Federal responsibility. The resource reports prepared by the project proponent under this section do not supplant the requirements under existing environmental laws related to the information required for Federal authorization or consultation processes. The relevant Federal entities shall independently evaluate the information submitted and shall be responsible for the accuracy, scope, and contents of all Federal authorization decision documents and related environmental reviews.

(f) Resource Report 1—General project description. This report should describe all expected facilities associated with the project, special construction and operation procedures, construction timetables, future plans for related construction, and permits, authorizations, and consultations that are expected to be required for proposed project. Resource Report 1 must:

(1) Describe and provide location maps of all facilities to be constructed, modified, abandoned, replaced, or removed, including facilities related to construction and operational support activities and areas such as maintenance bases, staging areas, communications towers, power lines, and new access roads (roads to be built or modified), as well as any existing infrastructure proposed to be used for the project (e.g., connections to existing substations and transmission, and existing access roads);

(2) Describe specific generation resources that are known or reasonably foreseen to be developed or interconnected as a result of the proposed electric transmission project, if any;

(3) Identify facilities constructed by other entities that are related to the proposed project (e.g., fiber optic cables) and where those facilities would be located;

(4) Provide the following information for each facility described under paragraphs (f)(1) through (3) of this section:

(i) A brief description of the facility, including, as appropriate, ownership, land requirements, megawatt size, construction status, and an update of the latest status of Federal, State, and local permits and approvals; and

(ii) Current topographic maps showing the location of the facility;

(5) Provide any communications with the appropriate State Historic Preservation Offices (SHPOs) and Tribal Historic Preservation Offices (THPOs) regarding cultural and historic resources in the project area;

(6) To the extent known, identify the permits, authorizations, and consultations that are expected to be required for proposed project, including consultation under section 106 of the NHPA, consultation under section 7 of the Endangered Species Act of 1973 (Pub. L. 93-205, as amended, 16 U.S.C. 1531 et seq.), consistency determinations under the Coastal Zone Management Act (CZMA), and permits under the Clean Water Act (33 U.S.C. 1251 et seq.) (CWA);

(7) Describe any developments in obtaining authorizations and permits or completing required consultations for the proposed project and identify environmental mitigation requirements specified in any permit or proposed in any permit application to the extent not specified elsewhere in this resource report or another resource report;

(8) If the project includes abandonment of certain facilities, rights-of-way, or easements, identify and describe the following:

(i) facilities, rights-of-way, or easements that the project proponent plans to abandon;

(ii) how the facilities, rights-of-way, or easements would be abandoned;

(iii) how the abandoned facilities, rights-of-way, and easements would be restored;

(iv) the owner of the facilities, rights-of-way, or easement after abandonment;

(v) the party responsible for the abandoned facilities, rights-of-way, or easement;

(vi) whether landowners were or are expected to be given the opportunity to request that the abandoned facilities on their property, including foundations and below ground components, be removed; and

(vii) landowners whose preferences regarding abandoned facility removal the project proponent does not intend to honor and reasons why the project proponent does not intend to honor those preferences;

(9) Provide construction timetables and describe, by milepost, proposed construction and restoration methods to be used in areas of rugged topography, residential areas, active croplands, sites where the proposed project would be located parallel to and under roads, and sites where explosives may be used;

(10) Describe estimated workforce requirements for the proposed project, including the number of construction spreads, average workforce requirements for each construction spread, estimated duration of construction from initial clearing to final restoration, and number of personnel to be hired to operate the proposed project;

(11) Describe reasonably foreseeable plans for future expansion of facilities related to the project, including additional land requirements and the compatibility of those plans with the current proposal;

(12) Provide the names and mailing addresses of all potentially affected landowners identified by the project proponent, identify which potentially affected landowners have been notified by the project proponent, and describe the methodology used to identify potentially affected landowners;

(13) Summarize the proposed mitigation approach anticipated by the project proponent to reduce the potential impacts of the proposed project to resources warranting or requiring mitigation; and

(14) Describe how the proposed project will reduce capacity constraints and congestion on the transmission system, meet unmet demand, or connect generation resources (including the expected type of generation, if known) to load, as appropriate.

(g) Resource Report 2—Water use and quality. This report should describe water resources that may be impacted by the proposed project, describe the potential impacts on these resources, and describe the measures taken to avoid and minimize adverse effects to such water resources, where appropriate. Resource Report 2 must:

(1) Identify surface water resources, including perennial waterbodies, intermittent streams, ephemeral waterbodies, municipal water supply or watershed areas, specially designated surface water protection areas and sensitive waterbodies, floodplains, and wetlands, that would be crossed by a potential route;

(2) For each surface water resource that would be crossed by a potential route, identify the approximate width of the crossing, State water quality classifications, any known potential pollutants present in the water or sediments, and any downstream potable water intake sources within the applicable analysis area;

(3) Describe typical staging area requirements at surface water resource crossings and identify and describe each potential surface water crossing where staging areas are likely to be more extensive and could require a mitigation approach to address potential impacts to the water resource;

(4) Provide two copies of floodplain and National Wetland Inventory (NWI) maps or, if not available, appropriate State wetland maps clearly showing the study corridors or potential routes and mileposts;

(5) For each wetland crossing, identify the milepost of the crossing, the wetland classification specified by the USFWS, and the length of the crossing, and describe, by milepost, wetland crossings as determined by field delineations using the current Federal methodology;

(6) For each floodplain crossing, identify the mileposts, acres of floodplains affected, flood elevation, and basis for determining that elevation;

(7) Describe and provide data supporting the expected impact of the proposed project on surface and groundwater resources;

(8) Describe and provide data supporting proposed avoidance and minimization measures as well as protection or enhancement measures that would reduce the potential for adverse impacts to surface and groundwater resources, and discuss any potential compensation expected to be provided for remaining unavoidable impacts to water resources due to the proposed project;

(9) Identify the location of known public and private groundwater supply wells or springs within the applicable analysis area;

(10) Identify locations of EPA or State-designated principal-source aquifers and wellhead protection areas crossed by a potential route;

(11) Discuss the results of any coordination with relevant Federal entities or non-Federal entities related to CWA permitting and include any written correspondence that resulted from the coordination; and

(12) Indicate whether the project proponent expects that a water quality certification (under section 401 of the CWA) will be required for any potential routes.

(h) Resource Report 3—Fish, wildlife, and vegetation. This report should identify and describe potential impacts to aquatic and terrestrial habitats, wildlife, and plants from the proposed project and discuss potential avoidance, minimization, or compensation measures, and enhancement or protection measures to reduce adverse impacts to these resources. Resource Report 3 must:

(1) Describe aquatic habitats that occur in the applicable analysis area, including commercial and recreational warmwater, coldwater, and saltwater fisheries and associated significant habitats such as spawning or rearing areas, estuaries, and other essential fish habitats;

(2) Describe terrestrial habitats that occur in the project area, including wetlands, typical wildlife habitats, and rare, unique, or otherwise significant habitats;

(3) Identify fish, wildlife, and plants that may be affected by the proposed project, including species that have commercial, recreational, or aesthetic value and that may be affected by the proposed project;

(4) Describe and provide the acreage of vegetation cover types that would be affected by the proposed project, including unique ecosystems or communities such as remnant prairie or old-growth forest, or significant individual plants, such as old-growth specimen trees;

(5) Describe the impact of the proposed project on aquatic and terrestrial habitats, including potential loss and fragmentation;

(6) Describe the potential impact of the proposed project on Federally listed, candidate, or proposed endangered or threatened species, State, Tribal, and local species of concern, and those species' habitats, including the possibility of a major alteration to ecosystems or biodiversity;

(7) Describe the potential impact of maintenance, clearing, and treatment of the applicable analysis area on fish, wildlife, and plant life;

(8) Identify all Federally listed, candidate, or proposed endangered or threatened species that may be affected by the proposed project and proposed or designated critical habitats that potentially occur in the applicable analysis area;

(9) Identify all State, Tribal, and local species of concern that may be affected by the proposed project;

(10) Identify all known and potential bald and golden eagle nesting and roosting sites, migratory bird flyways, and any sites important to migratory bird breeding, feeding, and sheltering within the applicable analysis areas. These identifications should coincide with the USFWS's most current range and location maps at the time this resource report is submitted;

(11) Discuss the results of any discussions conducted by the proponent to date with relevant Federal entities or relevant non-Federal entities related to fish, wildlife, and vegetation resources, and include any written correspondence that resulted from the discussions;

(12) Include the results of any appropriate surveys that have already been conducted, as well as plans and protocols for future surveys. If potentially suitable habitat is present, species-specific surveys may be required;

(13) If present, identify all Federally designated essential fish habitat (EFH) that occurs in the applicable analysis area and provide:

(i) Information on all EFH, as identified by the pertinent Federal fishery management plans, which may be adversely affected by potential routes;

(ii) The results of discussions with National Marine Fisheries Service; and

(iii) Any resulting EFH assessments that were evaluated, and EFH Conservation Recommendations that were provided by the National Marine Fisheries Service;

(14) Describe potential avoidance, minimization, or compensation measures, and enhancement or protection measures to address adverse effects described in paragraphs (h)(5), (6), and (7) of this section;

(15) Describe anticipated site-specific mitigation approaches for fisheries, wildlife (including migration corridors and seasonal areas of use), grazing, and plant life;

(16) Describe proposed measures to avoid and minimize incidental take of Federally listed and candidate species and species of concern, including eagles and migratory birds; and

(17) Include copies of any correspondence not otherwise provided pursuant to this paragraph (h) containing recommendations from appropriate Federal, State, and local fish and wildlife agencies to avoid or limit impact on wildlife, fish, fisheries, habitats, and plants, and the project proponent's response to those recommendations.

(i) Resource Report 4—Cultural resources. This report should describe the location of known cultural and historic resources, previous surveys and listings of cultural and historic resources, the potential effects that construction, operation, and maintenance of the proposed project will have on those resources, and initial recommendations for avoidance and minimization measures to address potential effects to those resources. The information provided in Resource Report 4 will contribute to the satisfaction of DOE's and relevant Federal entities' obligations under section 106 of the NHPA.

(1) Resource Report 4 must contain:

(i) A summary of known cultural and historic resources in the applicable analysis area including but not limited to those listed or eligible for listing on the National Register of Historic Places, such as properties of religious and cultural significance to Indian Tribes, and any material remains of past human life or activities that are of an archeological interest;

(ii) A description of potential effects that construction, operation, and maintenance of the proposed project will have on resources identified in paragraph (i)(1)(i) of this section;

(iii) Documentation of the project proponent's initial communications and engagement, including preliminary outreach and coordination, with Indian Tribes, indigenous peoples, THPOs, SHPOs, communities of interest, and other entities having knowledge of, interest regarding, or an understanding about the resources identified in paragraph (i)(1)(i) of this section and any written comments from SHPOs, THPOs, other Tribal historic preservation offices or governments, or others, as appropriate and available;

(iv) Recommended avoidance and minimization measures to address potential effects of the proposed project;

(v) Any relevant existing surveys or listings of cultural and historic resources in the affected environment; and

(vi) Recommendations for any additional surveys needed; and

(vii) A description, by milepost, of any area that has not been surveyed due to a denial of access by landowners.

(2) The project proponent must update this report with the results of any additional surveys that the project proponent chooses to undertake, as identified in in paragraph (i)(1)(vi) of this section, after the initial submission of this report.

(3) The project proponent must request confidential treatment for all material filed with DOE containing non-public location, character, and ownership information about cultural resources in accordance with § 900.4(h).

(j) Resource Report 5—Socioeconomics. This report should identify and quantify the impacts of constructing and operating the proposed project on the demographics and economics of communities in the applicable analysis area, including minority and underrepresented communities. Resource Report 5 must:

(1) Describe the socioeconomic resources that may be affected in the applicable analysis area;

(2) Describe the positive and adverse socioeconomic impacts of the proposed project;

(3) Evaluate the impact of any substantial migration of people into the applicable analysis area on governmental facilities and services and describe plans to reduce the impact on the local infrastructure;

(4) Describe on-site labor requirements during construction and operation, including projections of the number of construction personnel who currently reside within the applicable analysis area, who would commute daily to the site from outside the analysis area, or who would relocate temporarily within the analysis area;

(5) Determine whether existing affordable housing within the applicable analysis area is sufficient to meet the needs of the additional population; and

(6) Describe the number and types of residences and businesses that would be displaced by the proposed project, procedures to be used to acquire these properties, and types and amounts of relocation assistance payments.

(k) Resource Report 6—Tribal interests. This report must identify the Indian Tribes and indigenous communities that may be affected by the construction, operation, and maintenance of the project facilities, including those Indian Tribes and indigenous communities that may attach religious and cultural significance to cultural resources within the project area. In developing this report, the project proponent should consider both Indian Tribes with contemporary presence in the project area and Indian Tribes with historic connections to the area. To the extent Indian Tribes and indigenous communities are willing to communicate and share resource information, this report must discuss the potential impacts of project construction, operation, and maintenance on Indian Tribes and Tribal interests. This discussion must include impacts to sacred sites and Treaty rights, impacts related to enumerated resources and areas identified in the resource reports listed in this section (for instance, water rights, access to property, wildlife and ecological resources, etc.), and set forth available information on any additional, relevant traditional cultural and religious resources that could be affected by the proposed electric transmission project that are not already addressed. This resource report should acknowledge existing relationships between adjacent and underlying Federal land management agencies and the Indian Tribes. In developing this report, the project proponent should engage the Federal land manager early to leverage existing relationships. Specific site or property locations, the disclosure of which may create a risk of harm, theft, or destruction of archaeological or Native American cultural resources and information which would violate any Federal law, including section 9 of the Archaeological Resources Protection Act of 1979 (Pub. L. 96-95, as amended) (16 U.S.C. 470hh) and section 304 of the NHPA (54 U.S.C. 307103), should be submitted consistent with § 900.4(h). The project proponent must request confidential treatment for all material filed with DOE containing non-public location, character, and ownership information about Tribal resources in accordance with § 900.4(h).

(l) Resource Report 7—Communities of Interest. This report must summarize best available information about the presence of communities of interest. The resource report must identify and describe the potential impacts of constructing, operating, and maintaining the proposed electric transmission project on communities of interest; and describe any proposed mitigation approaches for such impacts or community concerns. The report must include a discussion of any disproportionate and/or adverse human health or environmental impacts to communities of interest.

(m) Resource Report 8—Geological resources and hazards. This report should describe geological resources that might be directly or indirectly affected by the proposed electric transmission project and methods to reduce those effects. The report should also describe geological hazards that could place project facilities at risk and methods proposed to mitigate those risks. Resource Report 8 must:

(1) Describe geological resources in the applicable analysis area that are currently or potentially exploitable, if relevant;

(2) Identify, by milepost, existing and potential geological hazards and areas of nonroutine geotechnical concern in the applicable analysis area, such as high seismicity areas, active faults, and areas susceptible to soil liquefaction; planned, active, and abandoned mines; karst terrain (including significant caves protected under the Federal Cave Resources Protection Act (Pub. L. 100-691, as amended) (16 U.S.C. 4301 et seq.)); and areas of potential ground failure, such as subsidence, slumping, and land sliding;

(3) Discuss the risks posed to the proposed project from each hazard or area of nonroutine geotechnical concern identified in paragraph (m)(2) of this section;

(4) Describe how the proposed project would be located or designed to avoid or minimize adverse effects to geological resources and reduce risk to project facilities, including geotechnical investigations and monitoring that would be conducted before, during, and after construction;

(5) Discuss the potential for blasting to affect structures and the measures to be taken to remedy such effects; and

(6) Specify methods to be used to prevent project-induced contamination from mines or from mine tailings along the right-of-way and discuss whether the proposed project would hinder mine reclamation or expansion efforts.

(n) Resource Report 9—Soil resources. This report should describe the soils that could be crossed by the proposed electric transmission project, the potential effect on those soils, and the proposed mitigation approach for those effects. Resource Report 9 must:

(1) List, by milepost, the soil associations that would be crossed by each potential route and describe the erosion potential, fertility, and drainage characteristics of each association;

(2) For the applicable analysis area:

(i) List the soil series within the area and the percentage of the area comprised of each series;

(ii) List the percentage of each series which would be permanently disturbed;

(iii) Describe the characteristics of each soil series; and

(iv) Indicate which soil units are classified as prime or unique farmland by the USDA, Natural Resources Conservation Service;

(3) Identify potential impacts from: soil erosion due to water, wind, or loss of vegetation; soil compaction and damage to soil structure resulting from movement of construction vehicles; wet soils and soils with poor drainage that are especially prone to structural damage; damage to drainage tile systems due to movement of construction vehicles and trenching activities; and interference with the operation of agricultural equipment due to the probability of large stones or blasted rock occurring on or near the surface as a result of construction;

(4) Identify, by milepost, cropland and residential areas where loss of soil fertility due to trenching and backfilling could occur; and

(5) Describe the proposed mitigation approach to reduce the potential for adverse impact to soils or agricultural productivity.

(o) Resource Report 10—Land use, recreation, and aesthetics. This report should describe the existing uses of land that may be impacted by the proposed project, and changes to those land uses and impacts to inhabitants and users that would occur if the proposed electric transmission project is approved. Resource Report 10 must:

(1) Describe the width and acreage requirements of all construction and permanent rights-of-way required for project construction, operation, and maintenance;

(2) List existing rights-of-way that would be co-located with or adjacent to the proposed rights-of-way (including temporary construction lines), and any required utility coordination, permits, and fees that would be associated as a result;

(3) Identify, preferably by diagrams, existing rights-of-way that are expected to be used for any portion of the construction or operational right-of-way, the overlap, and how much additional width is expected to be required;

(4) Identify the total amount of land to be purchased or leased for each project facility, the amount of land that would be disturbed for construction, operation, and maintenance of the facility, and the use of the remaining land not required for project operation and maintenance, if any;

(5) Identify the size of typical staging areas and expanded work areas, such as those at railroad, road, and waterbody crossings, and the size and location of all construction materials storage yards and access roads;

(6) Identify, by milepost, the existing use of:

(i) Lands crossed by or adjacent to each project facility; and

(ii) Lands on which a project facility is expected to be located;

(7) Describe:

(i) Planned development within the applicable analysis area that is either included in a master plan or on file with the local planning board or the county;

(ii) The time frame (if available) for such development; and

(iii) Proposed coordination to minimize impacts on land use due to such development;

(8) Identify areas within applicable analysis areas that:

(i) Are owned or controlled by Federal, State or local agencies, or private preservation groups;

(ii) Are directly affected by the proposed project or any project facilities or operational sites; and

(iii) Have special designations not otherwise mentioned in other resource reports.

(iv) Examples of such specially designated areas under this provision may include but are not limited to sugar maple stands, orchards and nurseries, landfills, hazardous waste sites, nature preserves, conservation or agricultural lands subject to conservation or agricultural easements or restrictions, game management areas, remnant prairie, old-growth forest, national or State forests, parks, designated natural, recreational or scenic areas, registered natural landmarks, and areas managed by Federal entities under existing land use plans as Visual Resource Management Class I or Class II areas;

(9) Identify Indian Tribes and indigenous communities that may be affected by the proposed project;

(10) Describe Tribal and indigenous community resources lands, interests, and established treaty rights that may be affected by the proposed project;

(11) Identify properties within the project area which may hold cultural or religious significance for Indian Tribes and indigenous communities, regardless of whether the property is on or off of any Federally recognized Indian reservation;

(12) Identify resources within the applicable analysis area that are included in, or are designated for study for inclusion in, if available: the National Wild and Scenic Rivers System (16 U.S.C. 1271), the National Wildlife Refuge System (16 U.S.C. 668dd), the National Wilderness Preservation System (16 U.S.C. 1131), the National Trails System (16 U.S.C. 1241-1251), the National Park System (54 U.S.C. 100101-120104), National Historic Landmarks (NHLs), National Natural Landmarks (NNLs), Land and Water Conservation Fund (LWCF) acquired Federal lands, LWCF State Assistance Program sites and the Federal Lands to Parks (FLP) program lands, or a wilderness area designated under the Wilderness Act (16 U.S.C. 1131-1136); or the National Marine Sanctuary System, including national marine sanctuaries (16 U.S.C. 1431-1445c-1.) and Marine National Monuments as designated under authority by the Antiquities Act (54 U.S.C. 320301-320303) or by Congress; National Forests and Grasslands (16 U.S.C. 1609 et seq); and lands in easement programs managed by the Natural Resource Conservation Service or the U.S. Forest Service (16 U.S.C. 3865, et seq.);

(13) Indicate whether the project proponent will need to submit a CZMA Federal consistency certification to State coastal management program(s) for the project, as required by NOAA's Federal consistency regulations at 15 CFR part 930, subpart D;

(14) Describe the impacts the proposed project will have on:

(i) Present uses of land in the applicable analysis area, including commercial uses, mineral resource uses, and recreational uses,

(ii) Public health and safety;

(iii) Federal, State, and Tribal scientific survey, research, and observation activities;

(iv) Sensitive resources and critical habitats;

(v) The aesthetic value of the land and its features; and

(vi) Federal, State or Tribal access limitations.

(15) Describe any temporary or permanent restrictions on land use that would result from the proposed project.

(16) Describe the proposed mitigation approach intended to address impacts described in paragraphs (o)(12) and (13) of this section, as well as protection and enhancement of existing land use;

(17) Provide a proposed operations and maintenance plan for vegetation management, including management of noxious and invasive species;

(18) Describe the visual characteristics of the lands and waters affected by the proposed project. Components of this description include a description of how permanent project facilities will impact the visual character of proposed project right-of-way and surrounding vicinity, and measures proposed to lessen these impacts. Project proponents are encouraged to supplement the text description with visual aids;

(19) Identify, by milepost, all residences and buildings near the proposed electric transmission facility construction right-of-way, and identify the distance of the residence or building from the edge of the right-of-way and provide survey drawings or alignment sheets to illustrate the location of the proposed facility in relation to the buildings;

(20) List all dwellings and related structures, commercial structures, industrial structures, places of worship, hospitals, nursing homes, schools, or other structures normally inhabited by humans or intended to be inhabited by humans on a regular basis within the applicable analysis area and provide a general description of each habitable structure and its distance from the centerline of the proposed project. In cities, towns, or rural subdivisions, houses can be identified in groups, and the report must provide the number of habitable structures in each group and list the distance from the centerline to the closest habitable structure in the group;

(21) List all known commercial AM radio transmitters located within the applicable analysis area and all known FM radio transmitters, microwave relay stations, or other similar electronic installations located within the analysis area; provide a general description of each installation and its distance from the centerline of the proposed project; and locate all installations on a routing map; and

(22) List all known private airstrips within the applicable analysis area and all airports registered with the Federal Aviation Administration (FAA) with at least one runway more than 3,200 feet in length that are located within the analysis area. Indicate whether any transmission structures will exceed a 100:1 horizontal slope (one foot in height for each 100 feet in distance) from the closest point of the closest runway. List all airports registered with the FAA having no runway more than 3,200 feet in length that are located within the analysis area. Indicate whether any transmission structures will exceed a 50:1 horizontal slope from the closest point of the closest runway. List all heliports located within the analysis area. Indicate whether any transmission structures will exceed a 25:1 horizontal slope from the closest point of the closest landing and takeoff area of the heliport. Provide a general description of each private airstrip, registered airport, and registered heliport, and state the distance of each from the centerline of the proposed transmission line. Locate all airstrips, airports, and heliports on a routing map.

(23) Information made available under paragraphs (o)(9), (10), and (11) must be submitted consistent with § 900.4(h), including information regarding specific site or property locations, the disclosure of which will create a risk of harm, theft, or destruction of archaeological or Native American cultural resources and information which would violate any Federal law, including section 9 of the Archaeological Resources Protection Act of 1979 (Pub. L. 96-95, as amended) (16 U.S.C. 470hh) and section 304 of the NHPA (54 U.S.C. 307103).

(p) Resource Report 11—Air quality and noise effects. This report should identify the effects of the proposed electric transmission project on the existing air quality and noise environment and describe proposed measures to mitigate the effects. Resource Report 11 must:

(1) Describe the existing air quality in the applicable analysis area, indicate if any project facilities are located within a designated nonattainment or maintenance area under the Clean Air Act (42 U.S.C. 7401 et seq.), and provide the distance from the project facilities to any Class I area in the project area;

(2) Estimate emissions from the proposed project and the corresponding impacts on air quality and the environment;

(i) Estimate the reasonably foreseeable emissions, including greenhouse gas emissions, from construction, operation, and maintenance of the project facilities (such as emissions from tailpipes, equipment, fugitive dust, open burning, and substations) expressed in tons per year; include supporting calculations, emissions factors, fuel consumption rates, and annual hours of operation;

(ii) Estimate the reasonably foreseeable change in greenhouse gas emissions from the existing, proposed, and reasonably foreseeable generation resources identified in Resource Report 1 (see paragraph (f) of this section) that may connect to the proposed project or interconnect as a result of the proposed project, if any, as well as any other modeled air emissions impacts;

(iii) For each designated nonattainment or maintenance area, provide a comparison of the emissions from construction, operation, and maintenance of the proposed project with the applicable General Conformity thresholds (40 CFR part 93);

(iv) Identify the corresponding impacts on communities and the environment in the applicable analysis area from the estimated emissions;

(v) Describe any proposed mitigation measures to control emissions identified under this section; and

(vi) Estimate the reasonably foreseeable effect of the proposed project on indirect emissions;

(3) Describe existing noise levels at noise-sensitive areas in the applicable analysis area, such as schools, hospitals, residences, and any areas covered by relevant State or local noise ordinances;

(i) Report existing noise levels as the a-weighted decibel (dBA) Leq (day), Leq (night), and Ldn (day-night sound level) and include the basis for the data or estimates;

(ii) Include a plot plan that identifies the locations and duration of noise measurements, the time of day, weather conditions, wind speed and direction, engine load, and other noise sources present during each measurement; and

(iii) Identify any noise regulations that may be applicable to the proposed project;

(4) Estimate the impact of the proposed project on the noise environment;

(i) Provide a quantitative estimate of the impact of transmission line operation on noise levels at the edge of the proposed right-of-way, including corona, insulator, and Aeolian noise; and provide a quantitative estimate of the impact of operation of proposed substations and appurtenant project facilities on noise levels at nearby noise-sensitive areas, including discrete tones;

(A) Include step-by-step supporting calculations or identify the computer program used to model the noise levels, the input and raw output data and all assumptions made when running the model, far-field sound level data for maximum facility operation (either from the manufacturer or from far-field sound level data measured from similar project facilities in service elsewhere) and the source of the data;

(B) Include sound pressure levels for project facilities, dynamic insertion loss for structures, and sound attenuation from the project facilities to the edge of the right-of-way or to nearby noise-sensitive areas (as applicable);

(ii) Describe the impact of proposed construction activities, including any nighttime construction, on the noise environment; estimate the impact of any horizontal directional drilling, pile driving, or blasting on noise levels at nearby noise-sensitive areas and include supporting assumptions and calculations;

(5) Based on noise estimates, indicate whether the proposed project will comply with applicable noise regulations and whether noise attributable to any proposed substation or appurtenant facility will exceed permissible levels at any pre-existing noise-sensitive area;

(6) Based on noise estimates, determine whether any wildlife-specific noise thresholds may have an impact on the proposed project, such as those thresholds specific to avian species that may be relevant in significant wildlife areas, if appropriate; and

(7) Describe measures, and manufacturer's specifications for equipment, proposed to mitigate noise effects and impacts to air quality, including emission control systems, installation of filters, mufflers, or insulation of piping and buildings, and orientation of equipment away from noise-sensitive areas.

(q) Resource Report 12—Alternatives. This report should describe the range of study corridors that were considered as alternatives during the planning, identification, and design of the proposed electric transmission project and compare the environmental impacts of such corridors and the routes contained in those corridors. This analysis may inform the relevant Federal entities' subsequent analysis of their alternatives during the NEPA process. Resource Report 12 must:

(1) Identify all study corridors and routes contained within those corridors. The report must identify the location of the corridors on maps of sufficient scale to depict their location and relationship to the proposed project, and the relationship of the proposed electric transmission facility to existing rights-of-way;

(2) Discuss the “no action” alternative and the potential for accomplishing the proponent's proposed objectives using alternative means;

(3) Discuss design and construction methods considered by the project proponent;

(4) Identify all the alternative study corridors and routes the project proponent considered in the initial screening for the proposed project but did not recommend for further study and the reasons why the proponent chose not to examine such alternatives.

(5) For alternative study corridors and routes recommended for more in-depth consideration, the report must:

(i) Describe the potential impacts to cultural and historic resources for each alternative;

(ii) Describe the environmental characteristics of each alternative, provide comparative tables showing the differences in environmental characteristics for the alternatives, and include an analysis of the potential relative environmental impacts for each alternative;

(iii) Provide an explanation of the costs to construct, operate, and maintain each alternative, the potential for each alternative to meet project deadlines, and technological and procedural constraints in developing the alternatives; and

(iv) Demonstrate whether and how environmental benefits and costs were weighed against economic benefits and costs to the public.

(r) Resource Report 13—Reliability, resilience, and safety. This report should describe the impacts that would result from a failure of the proposed electric transmission facility, the measures, procedures, and features that would reduce the risk of failure, and measures in place to reduce impacts and protect the public if a failure did occur. Resource Report 13 must:

(1) Discuss events that could result in a failure of the proposed facility, including accidents, intentional destructive acts, and natural catastrophes (accounting for the likelihood of relevant natural catastrophes resulting from climate change);

(2) Describe the reasonably foreseeable impacts that would result from a failure of the proposed electric transmission facility, including hazards to the public, environmental impacts, and service interruptions;

(3) Describe the operational measures, procedures, and design features of the proposed project that would reduce the risk of facility failure;

(4) Describe measures proposed to protect the public from failure of the proposed facility (including coordination with local agencies);

(5) Discuss contingency plans for maintaining service or reducing downtime;

(6) Describe measures used to exclude the public from hazardous areas, measures used to minimize problems arising from malfunctions and accidents (with estimates of probability of occurrence), and identify standard procedures for protecting services and public safety during maintenance and breakdowns; and

(7) Describe improvements to reliability likely to result from the proposed project.

§ 900.7 Standard and project-specific schedules.

(a) DOE shall publish, and update from time to time, a standard schedule that identifies the steps generally needed to complete decisions on all Federal environmental reviews and authorizations for a proposed electric transmission project. The standard schedule will include recommended timing for each step so as to allow final decisions on all Federal authorizations within two years of the publication of a notice of intent to prepare an environmental review document under § 900.9 or as soon as practicable thereafter, considering the requirements of relevant Federal laws, and the need for robust analysis of proposed project impacts, early and meaningful consultation with potentially affected Indian Tribes and engagement with stakeholders and communities of interest.

(b) During the Integrated Interagency Pre-Application (IIP) Process, DOE, in coordination with any NEPA joint lead agency and relevant Federal entities, shall prepare a project-specific schedule that is informed by the standard schedule prepared under paragraph (a) of this section and that establishes prompt and binding intermediate milestones and ultimate deadlines for the review of, and Federal authorization decisions relating to, a proposed electric transmission project, accounting for relevant statutory requirements, the potential route, reasonable alternative potential routes, if any, the need to assess and address any impacts to military testing, training, and operations, and other factors particular to the specific proposed project, including the need for early and meaningful consultation with potentially affected Indian Tribes and engagement with stakeholders and communities of interest. DOE may revise the project-specific schedule as needed to satisfy applicable statutory requirements, allow for engagement with stakeholders and communities of interest, and account for delays caused by the actions or inactions of the project proponent.

§ 900.8 IIP Process review meeting.

(a) An Integrated Interagency Pre-Application (IIP) Process review meeting is required for each proposed electric transmission project utilizing the IIP Process and may only be held after the project proponent submits a review meeting request to DOE. The project proponent may submit the request at any time following submission of the initial resource reports required under § 900.6. The review meeting request must include:

(1) A summary table of changes made to the proposed project since the IIP Process initial meeting, including potential environmental and community benefits from improved siting or design;

(2) Maps of potential routes and study corridors, including the proposed line, substations, and other infrastructure, as applicable, with at least as much detail as required for the initiation request described by § 900.5 and as modified in response to early stakeholder input and outreach and feedback from relevant Federal entities and relevant non-Federal entities;

(3) If known, a schedule for completing any upcoming field resource surveys, as appropriate;

(4) A conceptual plan for implementation and monitoring of proposed mitigation measures to avoid, minimize, or compensate for effects of the proposed project, consistent with 40 CFR 1508.1(s) or any successor regulation. This may include compensatory mitigation measures (offsite and onsite);

(5) An updated public engagement plan described in § 900.5(d)(2), reflecting actions undertaken since the project proponent submitted the initiation request and input received from relevant Federal entities and relevant non-Federal entities;

(6) A listing of:

(i) The dates on which the project proponent filed applications or requests for Federal authorizations and the dates on which the project proponent filed revisions to previously filed applications or requests; and

(ii) Estimated dates for filing remaining applications or requests for Federal authorization;

(7) Estimated dates that the project proponent will file requests for authorizations and consultations with relevant non-Federal entities; and

(8) A proposed duration for each Federal land use authorization expected to be required for the proposed project, commensurate with the anticipated use of the proposed electric transmission facility.

(b) Not later than 10 calendar days after the date that DOE receives the review meeting request, DOE shall provide relevant Federal entities and relevant non-Federal entities with materials included in the request and the initial resource reports submitted under § 900.6 via electronic means.

(c) Not later than 60 calendar days after the date that DOE receives the review meeting request, DOE shall:

(1) Determine whether the meeting request meets the requirements of paragraph (a) of this section and whether the initial resource reports are sufficiently detailed; and

(2) Give notice to the project proponent and relevant Federal and non-Federal entities of DOE's determinations under paragraph (c)(1) of this section.

(d) If DOE determines under paragraph (c)(1) of this section that the meeting request does not meet the requirements of paragraph (a) of this section or that the initial resource reports are not sufficiently detailed, DOE must provide the reasons for that finding and a description of how the project proponent may address any deficiencies in the meeting request or resource reports so that DOE may reconsider its determination.

(e) Not later than 15 calendar days after the date that DOE provides notice to the project proponent under paragraph (c) of this section that the review meeting request and initial resource reports have been accepted, DOE shall convene the review meeting with the project proponent and the relevant Federal entities. All relevant non-Federal entities participating in the IIP Process shall also be invited.

(f) During the IIP Process review meeting:

(1) The relevant Federal entities shall discuss, and modify if needed, the analysis areas used in the initial resource reports;

(2) Relevant Federal entities shall identify any remaining issues of concern, known information gaps or data needs, and potential issues or conflicts that could impact the time it will take the relevant Federal entities to process applications for Federal authorizations for the proposed electric transmission project;

(3) Relevant non-Federal entities may identify remaining issues of concern, information needs, and potential issues or conflicts for the project;

(4) The participants shall discuss the project proponent's updates to the siting process to date, including stakeholder outreach activities, resultant stakeholder input, and project proponent response to stakeholder input;

(5) Led by DOE, all relevant Federal entities shall discuss statutory and regulatory standards that must be met to make decisions for Federal authorizations required for the proposed project;

(6) Led by DOE, all relevant Federal entities shall describe the process for, and estimated time to complete, required Federal authorizations and, where possible, the anticipated cost (e.g., processing and monitoring fees and land use fees);

(7) Led by DOE, all relevant Federal entities shall describe their expectations for complete applications for Federal authorizations for the proposed project;

(8) Led by DOE, all relevant Federal entities shall identify necessary updates to the initial resource reports that must be made before conclusion of the IIP Process, or, as necessary, following conclusion of the IIP Process; and

(9) DOE shall present the proposed project-specific schedule developed under § 900.7.

(g) Not later than 10 calendar days after the review meeting, DOE shall:

(1) Prepare a draft review meeting summary that includes a summary of the meeting discussion, a description of key issues and information gaps identified during the meeting, and any requests for more information from relevant Federal entities and relevant non-Federal entities; and

(2) Convey the draft summary to the project proponent, relevant Federal entities, and any non-Federal entities that participated in the meeting.

(h) The project proponent and entities that received the draft review meeting summary under paragraph (g) of this section will have 10 calendar days following receipt of the draft to review the draft and provide corrections to DOE.

(i) Not later than 10 calendar days following the close of the 10-day review period under paragraph (h) of this section, DOE shall:

(1) Prepare a final review meeting summary incorporating received corrections, as appropriate;

(2) Add the final summary to the consolidated administrative docket described by § 900.10; and

(3) Provide an electronic copy of the summary to the relevant Federal entities, relevant non-Federal entities, and the project proponent.

(j) Not later than 10 calendar days following the close of the 10-day review period under paragraph (h) of this section, DOE shall:

(1) determine whether the project proponent has developed the scope of its proposed project and alternatives sufficiently for DOE to determine that there exists an undertaking for purposes of section 106 of the NHPA; and

(2) if the scope is sufficiently developed, initiate consultation with SHPOs, THPOs, and others consistent with 36 CFR 800.2(c)(4), which may include authorizing a project proponent, as a CITAP applicant, to initiate section 106 consultation and providing appropriate notifications.

(k) After the review meeting and before the IIP Process close-out meeting described by § 900.9 the project proponent shall revise resource reports submitted under § 900.6 based on feedback from relevant Federal entities and relevant non-Federal entities received during the review meeting and based on any updated surveys conducted since the initial meeting.

§ 900.9 IIP Process close-out meeting.

(a) An Integrated Interagency Pre-Application (IIP) Process close-out meeting concludes the IIP Process for a proposed electric transmission project and may only be held after the project proponent submits a close-out meeting request to DOE. The project proponent may submit the request at any time following the submission of the updated resource reports as required under § 900.8. The close-out meeting request shall include:

(1) A summary table of changes made to the proposed project during the IIP Process, including potential environmental and community benefits from improved siting or design;

(2) A description of all changes made to the proposed project since the review meeting, including a summary of changes made to the updated resource reports in response to the concerns raised during the review meeting;

(3) A final public engagement plan, as described in § 900.5(d)(2);

(4) Requests for Federal authorizations for the proposed project; and

(5) An updated estimated timeline of filing requests for all other authorizations and consultations with non-Federal entities.

(b) Not later than 10 calendar days after the date that DOE receives the close-out meeting request, DOE shall provide relevant Federal entities and relevant non-Federal entities with materials included in the request and any updated resource reports submitted under § 900.6 via electronic means.

(c) Not later than 60 calendar days after the date that DOE receives the close-out meeting request, DOE shall:

(1) Determine whether the meeting request meets the requirements of paragraph (a) of this section and whether the updated resource reports are sufficiently detailed; and

(2) Give notice to the project proponent and relevant Federal and non-Federal entities of DOE's determinations under paragraph (c)(1) of this section.

(d) If DOE determines that the meeting request does not meet the requirements of paragraph (a) of this section or that the updated resource reports are not sufficiently detailed, DOE must provide the reasons for that finding and a description of how the project proponent may address any deficiencies in the meeting request or resource reports so that DOE may reconsider its determination.

(e) Not later than 15 calendar days after the date that DOE provides notice to the project proponent under paragraph (c) of this section that the close-out meeting request and updated resource reports have been accepted, DOE shall convene the close-out meeting with the project proponent and all relevant Federal entities. All relevant non-Federal entities participating in the IIP Process shall also be invited.

(f) The IIP Process close-out meeting concludes the IIP Process. During the close-out meeting:

(1) The participants shall discuss the project proponent's updates to the siting process to date, including stakeholder outreach activities, resultant stakeholder input, and project proponent response to stakeholder input; and

(2) DOE shall present the final project-specific schedule.

(g) Not later than 10 calendar days after the close-out meeting, DOE shall:

(1) Prepare a draft close-out meeting summary; and

(2) Convey the draft summary to the project proponent, relevant Federal entities, and any non-Federal entities that participated in the meeting.

(h) The project proponent and entities that received the draft close-out meeting summary under paragraph (g) of this section will have 10 calendar days following receipt of the draft to review the draft and provide corrections to DOE.

(i) Not later than 10 calendar days following the close of the 10-day review period under paragraph (h) of this section, DOE shall:

(1) Prepare a final close-out meeting summary by incorporating received corrections, as appropriate;

(2) Add the final summary to the consolidated administrative docket described by § 900.10;

(3) Provide an electronic copy of the summary to all relevant Federal entities, relevant non-Federal entities, and the project proponent; and

(4) In the event that the proposed project is not identified as a covered project pursuant to § 900.5(e), notify the FPISC Executive Director that the proposed project ought to be included on the FPISC Dashboard as a transparency project.

(j) DOE and any NEPA joint lead agency shall issue a Notice of Intent to prepare an environmental review document for the proposed project within 90 days of the later of the IIP Process close-out meeting or the receipt of a complete application for a Federal authorization for which NEPA review will be required, as consistent with the final project-specific schedule.

(k) DOE shall issue, for each Federal land use authorization for a proposed electric transmission facility, a preliminary duration determination commensurate with the anticipated use of the proposed facility.

§ 900.10 Consolidated administrative docket.

(a) DOE shall maintain a consolidated docket of:

(1) All information that DOE distributes to or receives from the project proponent, relevant Federal entities, and relevant non-Federal entities related to the Integrated Interagency Pre-Application (IIP) Process, including:

(i) The IIP initiation request, review meeting request, and close-out meeting request required by §§ 900.5, 900.8, and 900.9;

(ii) The IIP Process final meeting summaries required by §§ 900.5, 900.8 and 900.9;

(iii) The IIP Process final resource reports developed under § 900.6;

(iv) The final project-specific schedule developed under §§ 900.7 and 900.8;

(v) Other documents submitted by the project proponent as part of the IIP Process or provided to the project proponent as part of the IIP Process, including but not limited to maps, publicly available data, and other supporting documentation; and

(vi) Communications between any relevant Federal or non-Federal entity and the project proponent regarding the IIP Process; and

(2) All information assembled and used by relevant Federal entities as the basis for Federal authorizations and related reviews following completion of the IIP Process.

(b) Federal entities should include DOE in all communications with the project proponent related to the IIP Process for the proposed electric transmission project.

(c) DOE shall make the consolidated docket available, as appropriate, to the NEPA joint lead agency selected under § 900.11; any relevant Federal or non-Federal entity responsible for issuing an authorization for the proposed project; and any consulting parties per section 106 of the NHPA, consistent with 36 CFR part 800. DOE shall exclude or redact privileged documents, as appropriate.

(d) Where necessary and appropriate, DOE may require a project proponent to contract with a qualified record-management consultant to compile a contemporaneous docket on behalf of all participating agencies. Any such contractor shall operate at the direction of DOE, and DOE shall retain responsibility and authority over the content of the docket.

(e) Upon request, any member of the public will be provided materials included in the docket, excluding any materials protected as CEII or otherwise required or allowed to be withheld under the Freedom of Information Act.

§ 900.11 NEPA lead agency and selection of NEPA joint lead agency.

(a) For a proposed electric transmission project that is accepted for the Integrated Interagency Pre-Application (IIP) Process under § 900.5, DOE shall serve as the NEPA lead agency to prepare an environmental review document to serve the needs of all relevant Federal entities. A NEPA joint lead agency to prepare the environmental review document may also be designated pursuant to this section, no later than by the IIP Process review meeting.

(b) The NEPA joint lead agency, if any, shall be the Federal entity with the most significant interest in the management of Federal lands or waters that would be traversed or affected by the proposed project. DOE shall make this determination in consultation with all Federal entities that manage Federal lands or waters traversed or affected by the proposed project. For a proposed project that would traverse lands managed by both the USDA and the DOI, DOE will request that USDA and DOI determine the appropriate NEPA joint lead agency, if any.

§ 900.12 Environmental review.

(a) After the Integrated Interagency Pre-Application (IIP) Process close-out meeting, and after receipt of a relevant application for a Federal authorization or permit in accordance with the final project-specific schedule, DOE and any NEPA joint lead agency selected under § 900.11 shall prepare an environmental review document for the proposed electric transmission project designed to serve the needs of all relevant Federal entities.

(b) When preparing the environmental review document, DOE and any NEPA joint lead agency shall:

(1) Consider the materials developed throughout the IIP Process; and

(2) Consult with relevant Federal entities and relevant non-Federal entities.

(c) DOE, in consultation with any NEPA joint lead agency, is expected to be responsible for:

(1) Identifying, contracting with, directing, supervising, and arranging for the payment of contractors, as appropriate, to draft the environmental review document; and

(2) Publishing the environmental review document and any related documents.

(d) Each Federal entity or non-Federal entity that is responsible for issuing a separate Federal authorization for the proposed project shall:

(1) Identify all information and analysis needed to make the authorization decision; and

(2) Identify all alternatives that need to be included, including a preferred alternative, with respect to the authorization.

(e) DOE and any NEPA joint lead agency, in consultation with relevant Federal entities, shall identify the full scope of alternatives for analysis, including the no action alternative.

(f) To the maximum extent permitted under law, relevant Federal entities shall use the environmental review document as the basis for all Federal authorization decisions on the proposed project. DOE and the relevant Federal entities shall issue, except where inappropriate or inefficient, a joint decision document, which will include the determination by the Secretary of a duration for each land use authorization issued on the proposed project.

(g) For all proposed projects, DOE shall serve as lead agency for consultation under the Endangered Species Act (50 CFR 402.07) and section 106 of the NHPA (36 CFR 800.2(a)(2)) unless the relevant Federal entities designate otherwise. DOE shall coordinate these consultation processes with the Federal agency with the most significant interest in the management of Federal lands or waters that would be traversed or affected by the proposed project or the designated lead agency.

§ 900.13 Severability.

The provisions of this part are separate and severable from one another. Should a court hold any provision(s) to be stayed or invalid, such action shall not affect any other provision of this part and the remaining provisions shall remain in effect.

PART 903 POWER AND TRANSMISSION RATES

Authority: Secs. 301(b), 302(a), and 644 of Department of Energy Organization Act, Pub. L. 95-91 (42 U.S.C. 7101 et seq.); sec. 5 of the Flood Control Act of 1944 (16 U.S.C. 825s); the Reclamation Act of 1902 (43 U.S.C. 372 et seq.), as amended and supplemented by subsequent enactments, particularly sec. 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and the Acts specifically applicable to individual projects or power systems.

Source: 50 FR 37837, Sept. 18, 1985, unless otherwise noted.

Subpart A Procedures for Public Participation in Power and Transmission Rate Adjustments and Extensions for the Alaska, Southeastern, Southwestern, and Western Area Power Administrations

§ 903.1 Purpose and scope; application.

(a) Except as otherwise provided herein, these regulations establish procedures for the development of power and transmission rates by the Administrators of the Alaska, Southeastern, Southwestern, and Western Area Power Administrations; for the providing of opportunities for interested members of the public to participate in the development of such rates; for the confirmation, approval, and placement in effect on an interim basis by the Secretary or his or her designee of such rates; and for the submission of such rates to the Federal Energy Regulatory Commission with or without prior interim approval. These regulations supplement Delegation Order No. 0204-108 of the Secretary of Energy, which was published in the Federal Register and became effective on December 14, 1983 (48 FR 55664), with respect to the activities of the Secretary or his or her designee and the Administrators.

(b) These procedures shall apply to all power and transmission rate adjustment proceedings for the Power Marketing Administrations (PMAs) which are commenced after these regulations become effective or were in process on the effective date of these regulations, but for which the FERC had not issued any substantive orders on or before December 14, 1983. These procedures supersede “Procedures for Public Participation in Power and Transmission Rate Adjustments and Extensions for the Alaska, Southeastern, Southwestern, and Western Area Power Administrations” published in 45 FR 86983 (December 31, 1980) and amended at 46 FR 6864 (January 22, 1981) and 46 FR 25427 (May 7, 1981).

(c) Except to the extent deemed appropriate by the Administrator in accordance with applicable law, these procedures do not apply to rates for short term sales of capacity, energy, or transmission service.

[50 FR 37837, Sept. 18, 1985; 50 FR 48075, Nov. 21, 1985; 84 FR 5349, Feb. 21, 2019]

§ 903.2 Definitions.

As used herein—

(a) Administrator means the Administrator of the PMA whose rate is involved in the rate adjustment, or anyone acting in such capacity.

(b) Department means the Department of Energy, including the PMAs but excluding the Federal Energy Regulatory Commission.

(c) FERC means the Federal Energy Regulatory Commission.

(d) Major rate adjustment means a rate adjustment other than a minor rate adjustment.

(e) Minor rate adjustment means a rate adjustment which (1) will produce less than 1 percent change in the annual revenues of the power system or (2) is for a power system which has either annual sales normally less than 100 million kilowatt hours or an installed capacity of less than 20,000 kilowatts.

(f) Notice means the statement which informs customers and the general public of Proposed Rates or proposed rate extensions, opportunities for consultation and comment, and public forums. The Notice shall be by and effective on the date of publication in the Federal Register. Whenever a time period is provided, the date of publication in the Federal Register shall determine the commencement of the time period, unless otherwise provided in the Notice. The Notice shall include the name, address, and telephone number of the person to contact if participation or further information is sought.

(g) Power Marketing Administration or PMA means the Alaska Power Administration, Southeastern Power Administration, Southwestern Power Administration, or Western Area Power Administration.

(h) Power system means a powerplant or a group of powerplants and related facilities, including transmission facilities, or a transmission system, that the PMA treats as one unit for the purposes of establishing rates and demonstrating repayment.

(i) Proposed Rate means a rate revision or a rate for a new service which is under consideration by the Department on which public comment is invited.

(j) Provisional Rate means a rate which has been confirmed, approved, and placed in effect on an interim basis by the Secretary or his or her designee.

(k) Rate means the monetary charge or the formula for computing such a charge for any electric service provided by the PMA, including but not limited to charges for capacity (or demand), energy, or transmission service; however, it does not include leasing fees, service facility charges, or other types of facility use charges. A rate may be set forth in a rate schedule or in a contract.

(l) Rate adjustment means a change in an existing rate or rates, or the establishment of a rate or rates for a new service. It does not include a change in rate schedule provisions or in contract terms, other than changes in the price per unit of service, nor does it include changes in the monetary charge pursuant to a formula stated in a rate schedule or a contract.

(m) Rate schedule means a document identified as a “rate schedule,” “schedule of rates,” or “schedule rate” which designates the rate or rates applicable to a class of service specified therein and may contain other terms and conditions relating to the service.

(n) Secretary means the Secretary of the United States Department of Energy.

(o) Short term sales means sales that last for no longer than one year.

(p) Substitute Rate means a rate which has been developed in place of the rate that was disapproved by the FERC.

[50 FR 37837, Sept. 18, 1985; 50 FR 48075, Nov. 21, 1985; 84 FR 5350, Feb. 21, 2019]

§ 903.11 Advance announcement of rate adjustment.

The Administrator may announce that the development of rates for a new service or revised rates for an existing service is under consideration. The announcement shall contain pertinent information relevant to the rate adjustment. The announcement may be through direct contact with customers, at public meetings, by press release, by newspaper advertisement, and/or by Federal Register publication. Written comments relevant to rate policy and design and to the rate adjustment process may be submitted by interested parties in response to the announcement. Any comments received shall be considered in the development of Proposed Rates.

§ 903.13 Notice of proposed rates.

(a) The Administrator shall give Notice that Proposed Rates have been prepared and are under consideration. The Notice shall include:

(1) The Proposed Rates;

(2) An explanation of the need for and derivation of the Proposed Rates;

(3) The locations at which data, studies, reports, or other documents used in developing the Proposed Rates are available for inspection and/or copying;

(4) The dates, times, and locations of any initially scheduled public forums; and

(5) Address to which written comments relative to the Proposed Rates and requests to be informed of FERC actions concerning the rates may be submitted.

(b) Upon request, customers of the power system and other interested persons will be provided with copies of the principal documents used in developing the Proposed Rates.

§ 903.14 Consultation and comment period.

All interested persons will have the opportunity to consult with and obtain information from the PMA, to examine backup data, and to make suggestions for modification of the Proposed Rates for a period ending (a) 90 days in the case of major rate adjustments, or 30 days in the case of minor rate adjustments, after the Notice of Proposed Rates is published in the Federal Register, except that such periods may be shortened for good cause shown; (b) 15 days after any answer which may be provided pursuant to § 903.15(b) hereof; (c) 15 days after the close of the last public forum; or (d) such other time as the Administrator may designate; whichever is later. At anytime during this period, interested persons may submit written comments to the PMA regarding the Proposed Rates. The Administrator may also provide additional time for the submission of written rebuttal comments. All written comments shall be available at a designated location for inspection, and copies also will be furnished on request for which the Administrator may assess a fee. Prior to the action described in § 903.21, the Administrator may, by appropriate announcement postpone any procedural date or make other procedural changes for good cause shown at the request of any party or on the Administrator's own motion. The Administrator shall maintain, and distribute on request, a list of interested persons.

§ 903.15 Public information forums.

(a) One or more public information forums shall be held for major rate adjustments, except as otherwise provided in paragraph (c) of this section, and may be held for minor adjustments, to explain, and to answer questions concerning, the Proposed Rates and the basis of and justification for proposing such rates. The number, dates, and locations of such forums will be determined by the Administrator in accordance with the anticipated or demonstrated interest in the Proposed Rates. Notice shall be given in advance of such forums. A public information forum may be combined with a public comment forum held in accordance with § 903.16.

(b) The Administrator shall appoint a forum chairperson. Questions raised at the forum concerning the Proposed Rates and the studies shall be answered by PMA representatives at the forum, at a subsequent forum, or in writing at least 15 days before the end of the consultation and comment period. However, questions that involve voluminous data contained in the PMA records may be answered by providing an opportunity for consultation and for a review of the records at the PMA offices. As a minimum, the proceedings of the forum held at the principal location shall be transcribed. Copies of all documents introduced, and of questions and written answers shall be available at a designated location for inspection and copies will be furnished by the Administrator on request, for which a fee may be assessed. Copies of the transcript may be obtained from the transcribing service.

(c) No public information forum need be held for major rate adjustments if, after the Administrator has given Notice of a scheduled forum, no person indicates in writing by a prescribed date an intent to appear at such public forum.

§ 903.16 Public comment forums.

(a) One or more public comment forums shall be held for major rate adjustments, except as otherwise provided in paragraph (c) of this section, and may be held for minor rate adjustments, to provide interested persons an opportunity for oral presentation of views, data, and arguments regarding the Proposed Rates. The number, dates, and locations of such forums will be determined by the Administrator in accordance with the anticipated or demonstrated interest in the Proposed Rates. Notice shall be given at least 30 days in advance of the first public comment forum at each location and shall include the purpose, date, time, place, and other information relative to the forum, as well as the locations where pertinent documents are available for examination and/or copying.

(b) The Administrator shall designate a forum chairperson. At the forum, PMA representatives may question those persons making oral statements and comments. The chairperson shall have discretion to establish the sequence of, and the time limits for, oral presentations and to determine if the comments are relevant and noncumulative. Forum proceedings shall be transcribed. Copies of all documents introduced shall be available at a designated location for inspection, and copies shall be furnished on request for which the Administrator may assess a fee. Copies of the transcript may be obtained from the transcribing service.

(c) No public comment forum need be held for major rate adjustments if, after the Administrator has given notice of a scheduled forum, no person indicates in writing by a prescribed date an intent to appear at such public forum.

§ 903.17 Informal public meetings for minor rate adjustments.

In lieu of public information or comment forums in conjunction with a minor rate adjustment, informal public meetings may be held if deemed appropriate by the Administrator. Such informal meetings will not require a Notice or a transcription.

§ 903.18 Revision of proposed rates.

During or after the consultation and comment period and review of the oral and written comments on the Proposed Rates, the Administrator may revise the Proposed Rates. If the Administrator determines that further public comment should be invited, the Administrator shall afford interested persons an appropriate period to submit further written comments to the PMA regarding the revised Proposed Rates. The Administrator may convene one or more additional public information and/or public comment forums. The Administrator shall give Notice of any such additional forums.

§ 903.21 Completion of rate development; provisional rates.

(a) Following completion of the consultation and comment period and review of any oral and written comments on the Proposed Rates, the Administrator may: (1) Withdraw the proposal; (2) develop rates which in the Administrator's and the Secretary's or his or her designee's judgment should be confirmed, approved, and placed into effect on an interim basis (Provisional Rates); or (3) develop rates which in the Administrator's judgment should be confirmed, approved, and placed into effect by the FERC on a final basis without being placed into effect on an interim basis. A statement shall be prepared and made available to the public setting forth the principal factors on which the Secretary's or his or her designee's or the Administrator's decision was based. The statement shall include an explanation responding to the major comments, criticisms, and alternatives offered during the comment period. The Administrator shall certify that the rates are consistent with applicable law and that they are the lowest possible rates to customers consistent with sound business principles. The rates shall be submitted promptly to the FERC for confirmation and approval on a final basis.

(b) The Secretary or his or her designee shall set the effective date for Provisional Rates. The effective date shall be at least 30 days after the Secretary's or his or her designee's decision except that the effective date may be sooner when appropriate to meet a contract deadline, to avoid financial difficulties, to provide a rate for a new service, or to make a minor rate adjustment.

(c) The effective date may be adjusted by the Administrator to coincide with the beginning of the next billing period following the effective date set by the Secretary or his or her designee for the Provisional Rates.

(d) Provisional Rates shall remain in effect on an interim basis until: (1) They are confirmed and approved on a final basis by the FERC; (2) they are disapproved and the rates last previously confirmed and approved on a final basis become effective; (3) they are disapproved and higher Substitute Rates are confirmed and approved on a final basis and placed in effect by the FERC; (4) they are disapproved and lower Substitute Rates are confirmed and approved on a final basis by the FERC; or (5) they are superseded by other Provisional Rates placed in effect by the Secretary or his or her designee, whichever occurs first.

[50 FR 37837, Sept. 18, 1985, as amended at 84 FR 5350, Feb. 21, 2019]

§ 903.22 Final rate approval.

(a) Any rate submitted to the FERC for confirmation and approval on a final basis shall be accompanied with such supporting data, studies, and documents as the FERC may require, and also with the transcripts of forums, written answers to questions, written comments, the Administrator's certification, and the statement of principal factors leading to the decision. The FERC shall also be furnished a listing of those customers and other participants in the rate proceeding who have requested they be informed of FERC action concerning the rates.

(b) If the FERC confirms and approves Provisional Rates on a final basis, such confirmation and approval shall be effective as of the date such rates were placed in effect by the Secretary or his or her designee, as such date may have been adjusted by the Administrator. If the FERC confirms and approves on a final basis rates submitted by the Administrator without interim approval, such confirmation and approval shall be effective on a date set by the FERC.

(c) If the FERC disapproves Provisional Rates or other submitted rates, the Administrator shall develop Substitute Rates which take into consideration the reasons given by the FERC for its disapproval. If, in the Administrator's judgment, public comment should be invited upon proposed Substitute Rates, the Administrator may provide for a public consultation and comment period before submitting the Substitute Rates. Whether or not such public consultation and comment periods are provided, the Administrator will, upon request, provide customers of the power system and other interested persons with copies of the principal documents used in the development of the Substitute Rates. Within 120 days of the date of FERC disapproval of submitted rates, including Substitute Rates, or such additional time periods as the FERC may provide, the Administrator will submit the Substitute Rates to the FERC. A statement explaining the Administrator's decision shall accompany the submission.

(d) A Provisional Rate that is disapproved by the FERC shall remain in effect until higher or lower rates are confirmed and approved by the FERC on a final basis or are superseded by other rates placed into effect by the Secretary or his or her designee on an interim basis: Provided, That if the Administrator does not file a Substitute Rate within 120 days of the disapproval or such greater time as the FERC may provide, and if the rate has been disapproved because the FERC determined that it would result in total revenues in excess of those required by law, the rate last previously confirmed and approved on a final basis will become effective on a date and for a period determined by the FERC and revenues collected in excess of such rate during such period will be refunded in accordance with paragraph (g) of this section.

(e) If a Substitute Rate confirmed and approved on a final basis by the FERC is higher than the provisional rate which was disapproved, the Substitute Rate shall become effective on a subsequent date set by the FERC, unless a subsequent Provisional Rate even higher than the Substitute Rate has been put into effect. FERC confirmation and approval of the higher Substitute Rate shall constitute final confirmation and approval of the lower disapproved Provisional Rate during the interim period that it was in effect.

(f) If a Substitute Rate confirmed and approved by the FERC on a final basis is lower than the disapproved provisional rate, such lower rate shall be effective as of the date the higher disapproved rate was placed in effect.

(g) Any overpayment shall be refunded with interest unless the FERC determines that the administrative cost of a refund would exceed the amount to be refunded, in which case no refund will be required. The interest rate applicable to any refund will be determined by the FERC.

(h) A rate confirmed and approved by the FERC on a final basis shall remain in effect for such period or periods as the FERC may provide or until a different rate is confirmed, approved and placed in effect on an interim or final basis: Provided, That the Secretary or his or her designee may extend a rate on an interim basis beyond the period specified by the FERC.

[50 FR 37837, Sept. 18, 1985, as amended at 84 FR 5350, Feb. 21, 2019]

§ 903.23 Rate extensions.

(a) The following regulations shall apply to the extension of rates which were previously confirmed and approved by the FERC or the Federal Power Commission, or established by the Secretary of the Interior, and for which no adjustment is comtemplated:

(1) The Administrator shall give Notice of the proposed extension at least 30 days before the expiration of the prior confirmation and approval, except that such period may be shortened for good cause shown.

(2) The Administrator may allow for consultation and comment, as provided in these procedures, for such period as the Administrator may provide. One or more public information and comment forums may be held, as provided in these procedures, at such times and locations and with such advance Notice as the Administrator may provide.

(3) Following notice of the proposed extension and the conclusion of any consultation and comment period, the Secretary or his or her designee may extend the rates on an interim basis.

(b) Provisional Rates and other existing rates may be extended on a temporary basis by the Secretary or his or her designee without advance notice or comment pending further action pursuant to these regulations or by the FERC. The Secretary or his or her designee shall publish notice in the Federal Register of such extension and shall promptly advise the FERC of the extension.

[50 FR 37837, Sept. 18, 1985, as amended at 84 FR 5350, Feb. 21, 2019]

PART 904 GENERAL REGULATIONS FOR THE CHARGES FOR THE SALE OF POWER FROM THE BOULDER CANYON PROJECT

Authority: Reclamation Act of 1902 (32 Stat. 388); Boulder Canyon Project Act of 1928 (43 U.S.C. 617 et seq.); Boulder Canyon Project Adjustment Act of 1940 (43 U.S.C. 618 et seq.); Department of Energy Organization Act (42 U.S.C. 7101 et seq.); Colorado River Storage Project Act of 1956 (43 U.S.C. 620 et seq.); Colorado River Basin Project Act of 1968 (43 U.S.C. 1501 et seq.); and Hoover Power Plant Act of 1984 (98 Stat. 1333 (43 U.S.C. 619 et seq.)).

Source: 51 FR 43154, Nov. 28, 1986, unless otherwise noted.

Subpart A Power Marketing

§ 904.1 Purpose.

(a) The Secretary of Energy, acting by and through the Administrator of the Western Area Power Administration (Administrator), is authorized and directed to promulgate charges for the sale of power generated at the Boulder Canyon Project powerplant, and also to promulgate such general regulations as the Secretary finds necessary and appropriate in accordance with the power marketing authorities in the Reclamation Act of 1902 (32 Stat. 388) and all acts amendatory thereof and supplementary thereto, and the Department of Energy Organization Act (42 U.S.C. 7101 et seq.).

(b) In accordance with the Boulder Canyon Project Act of 1928 (43 U.S.C. 617 et seq.), as amended and supplemented (Project Act); the Boulder Canyon Project Adjustment Act of 1940 (43 U.S.C. 618 et seq.), as amended and supplemented (Adjustment Act); the Department of Energy Organization Act (42 U.S.C. 7101 et seq.); and the Hoover Power Plant Act of 1984 (98 Stat. 1333 (43 U.S.C. 619 et seq.)) (Hoover Power Plant Act); the Western Area Power Administration (Western) promulgates these General Regulations for the Charges for the Sale of Power From the Boulder Canyon Project (General Regulations) defining the methodology to be used in the computation of the charges for the sale of power from the Boulder Canyon Project.

§ 904.2 Scope.

These General Regulations are effective June 1, 1987, and shall apply as the basis for computation of all charges applicable to any sale of power from the Boulder Canyon Project after May 31, 1987. “General Regulations for Power Generation, Operation, Maintenance, and Replacement at the Boulder Canyon Project, Arizona/Nevada” are the subject of a separate rulemaking of the Department of the Interior under 43 CFR part 431. The “General Regulations for Generation and Sale of Power in Accordance with the Boulder Canyon Project Adjustment Act” (1941 General Regulations) dated May 20, 1941, and the “General Regulations for Lease of Power” dated April 25, 1930, terminate May 31, 1987.

§ 904.3 Definitions.

The following terms wherever used herein shall have the following meanings:

(a) Billing Period shall mean the service period beginning on the first day and extending through the last day of any calendar month.

(b) Boulder City Area Projects shall mean the Boulder Canyon Project, the Parker-Davis Project, and the United States entitlement in the Navajo Generating Station (a feature of the Central Arizona Project).

(c) Capacity shall mean the aggregate of contingent capacity specified in section 105(a)(1)(A) and the contingent capacity specified in section 105(A)(1)(B) of the Hoover Power Plant Act (43 U.S.C. 619).

(d) Central Arizona Project shall mean those works as described in section 1521(a) of the Colorado River Basin Project Act of 1968 (43 U.S.C. 1501 et seq.), as amended.

(e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the Project Act and which is to be used only for the purposes specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act.

(f) Contract shall mean any contract for the sale of Boulder Canyon Project capacity and energy for delivery after May 31, 1987, between Western and any contractor.

(g) Contractor shall mean the entities entering into contracts with Western for electric service pursuant to the Hoover Power Plant Act.

(h) Excess Capacity shall mean capacity which is in excess of the lesser of: (1) Capacity that Hoover Powerplant is capable of generating with all units in service at a net effective head of 498 feet, or (2) 1,951,000 kW.

(i) Excess Energy shall mean energy obligated from the Project pursuant to section 105(a)(1)(C) of the Hoover Power Plant Act (43 U.S.C. 619).

(j) Firm Energy shall mean energy obligated from the Project pursuant to section 105(a)(1)(A) and section 105(a)(1)(B) of the Hoover Power Plant Act (43 U.S.C. 619).

(k) Overruns shall mean the use of capacity or energy, without the approval of Western, in amounts greater than Western's contract delivery obligation in effect for each type of service provided for in the Contract.

(l) Project or Boulder Canyon Project shall mean all works authorized by the Project Act, the Hoover Power Plant Act, and any future additions authorized by Congress, to be constructed and owned by the United States, but exclusive of the main canal and appurtenances authorized by the Project Act, now known as the All-American Canal.

(m) Replacements shall mean such work, materials, equipment, or facilities as determined by the United States to be necessary to keep the Project in good operating condition, but shall not include (except where used in conjunction with the word “emergency” or the phrase “however necessitated”) work, materials, equipment, or facilities made necessary by any act of God, or of the public enemy, or by any major catastrophe.

(n) Uprating Program shall mean the program authorized by section 101(a) of the Hoover Power Plant Act (43 U.S.C. 619(a)) for increasing the capacity of existing generating equipment and appurtenances at the Hoover Powerplant, as generally described in the report of the Department of the Interior, Bureau of Reclamation, entitled “Hoover Powerplant Uprating, Special Report,” issued in May 1980, as supplemented in the report entitled, “January 1985 Supplement (revised September 1985) to Hoover Powerplant Uprating, Special Report-May 1980.”

§ 904.4 Marketing responsibilities.

(a) Capacity and energy available from the Project will be marketed by Western under terms of the Conformed General Consolidated Power Marketing Criteria or Regulations for Boulder City Area Projects (Conformed Criteria) published in the Federal Register (49 FR 50582) on December 28, 1984. Western shall dispose of capacity and energy from the Project in accordance with section 105(a)(1) of the Hoover Power Plant Act (43 U.S.C. 619(a)(1)), these General Regulations, and the Contracts between the Contractors and Western.

(b) Procedures for the scheduling and delivery of capacity and energy shall be provided for in the Contracts between the Contractors and Western.

§ 904.5 Revenue requirements.

(a) Western shall collect all electric service revenues from the Project in accordance with applicable statutes and regulations and deposit such revenues into the Colorado River Dam Fund. All receipts from the Project shall be available for payment of the costs and financial obligations associated with the Project. The Secretary of the Interior is responsible for the administration of the Colorado River Dam Fund.

(b) The electric service revenue of the Project shall be collected through a charge, computed to be sufficient, together with other net revenues from the Project, to recover the following costs and financial obligations associated with the Project over the appropriate repayment periods set out in paragraph (c) of this section:

(1) Annual costs of operation and maintenance;

(2) Annual interest on unpaid investments in accordance with appropriate statutory authorities;

(3) Annual repayment of funds, and all reasonable costs incurred in obtaining such funds, advanced by non-Federal Contractors to the Secretary of the Interior for the Uprating Program;

(4) The annual payment of $300,000 to each of the States of Arizona and Nevada provided for in section 618(c) of the Adjustment Act and section 1543(c)(2) of the Colorado River Basin Project Act (43 U.S.C. 1501 et seq.) (Basin Act), as amended or supplemented;

(5) Capital costs of investments and Replacements, including amounts readvanced from the United States Treasury (Treasury);

(6) Repayment to the Treasury of the advances to the Colorado River Dam Fund for the Project made prior to May 31, 1987, for which payment was deferred because of a deficiency in firm energy generation due to a shortage of available water, as provided for in article 14(a) of the 1941 General Regulations and section 8 of the Boulder City Act of 1958 (72 Stat. 1726), as shown on the books of accounts of Reclamation as of May 31, 1987;

(7) Repayment to the Treasury of the first $25,000,000 of advances made to the Colorado River Dam Fund deemed to be allocated to flood control by section 617a(b) of the Project Act as provided by section 618f of the Adjustment Act; and

(8) Any other financial obligations of the Project imposed in accordance with law.

(c) The Project repayment period shall extend to the final year allowed under applicable cost recovery criteria. The revenue for the costs and financial obligations set out in paragraph (b) of this section shall be collected over the following repayment periods:

(1) The repayment period for advances made to the Colorado River Dam Fund from funds advanced to the Secretary of the Interior by non-Federal entities for the Uprating Program and associated work shall be the period commencing with the first day of the month following completion of each segment of the Uprating Program, or June 1, 1987, whichever is later, and ending September 30, 2017;

(2) The repayment period for the payments to the Treasury of the advances to the Colorado River Dam Fund for the Project which were payable prior to May 31, 1987, but which were deferred pursuant to article 14(a) of the 1941 General Regulations and section 8 of the Boulder City Act of 1958, shall be the power contract period beginning June 1, 1987, and ending September 30, 2017. Such repayment period is based on a 50-year repayment period beginning June 1, 1937, adjusted for the periods the initial payments were deferred;

(3) The repayment period for the payment to the Treasury of the first $25,000,000 of advances made to the Colorado River Dam Fund deemed to be allocated to flood control by section 617a(b) of the Project Act and deferred by section 618(f) of the Adjustment Act shall be the 50-year period beginning June 1, 1987;

(4) The repayment period for advances to the Colorado River Dam Fund for the Project made on or after June 1, 1937, and prior to June 1, 1987, shall be the 50-year period beginning June 1 immediately following the year of operation in which the funds were advanced;

(5) The repayment period for investments, other than for the visitor facilities authorized by section 101(a) of the Hoover Power Plant Act (43 U.S.C. 619(a)), made from Federal appropriations on or after June 1, 1987, shall be a 50-year period beginning with the first day of the fiscal year following the fiscal year the investment is placed in service; and

(6) The repayment period for the visitor facilities authorized by section 101(a) of the Hoover Power Plant Act (43 U.S.C. 619(a)) shall be the 50-year period beginning June 1, 1987, or when substantially completed, as determined by the Secretary of the Interior, if later.

(d) Annual costs for operation and maintenance and payments to States as set out in paragraph (b) of this section shall be collected as long as revenues accrue from the operation of the Project.

(e) Surplus revenues will also be collected for transfer from the Colorado River Dam Fund for contribution to the Lower Colorado River Basin Development Fund pursuant to section 1543(c)(2) of the Basin Act as amended by the Hoover Power Plant Act to provide revenue for the purposes of sections 1543(f) and 1543(g) of the Basin Act.

(f) All annual costs will be calculated based on a Federal fiscal year. To accommodate the transition from the pre-1987 operating year of June 1 to May 31 to a fiscal year, there will be a 4-month transition period beginning June 1, 1987, and ending September 30, 1987.

(g) If integrated operation of the Boulder Canyon Project with other Boulder City Area Projects and other Federal projects on the Colorado River, as provided in § 904.9 of these General Regulations, confers a direct power benefit upon such other Boulder City Area Projects and such other Federal projects, or if a direct power benefit is conferred by other Boulder City Area Projects or other Federal projects on the Colorado River upon the Boulder Canyon Project, Western shall equitably apportion such benefits and appropriate charges among the Boulder Canyon Project, other Boulder City Area Projects, and other Federal projects on the Colorado River.

§ 904.6 Charge for capacity and firm energy.

The charge for Capacity and Firm Energy from the Project shall be composed of two separate charges; a charge to provide for the basic revenue requirements, as identified in paragraphs (b), (c), and (d) of § 904.5 of these General Regulations (Base Charge), and a charge to provide the surplus revenue for the Lower Colorado River Basin Development Fund contribution, as identified in paragraph (e) of § 904.5 of these General Regulations (Lower Basin Development Fund Contribution Charge).

§ 904.7 Base charge.

(a) The Base Charge shall be developed by the Administrator and promulgated in accordance with appropriate DOE regulations. The Base Charge shall be composed of a capacity component and an energy component.

(b) The capacity component of the Base Charge shall be a dollar per kilowattmonth amount determined by (1) multiplying the estimated average annual revenue requirement developed pursuant to paragraphs (b), (c), and (d) of § 904.5 of these General Regulations by 50 percent, and (2) dividing the results of that multiplication by the estimated average annual kW rating of the Project, and (3) dividing the quotient by 12. The total estimated kW rating will be based on the powerplant output capability with all units in service at 498 feet of net effective head or 1,951,000 kW, whichever is less. The capacity component of the Base Charge shall be applied each billing period to each kW of rated output to which each Contractor is entitled by Contract. Adjustments to the application of the capacity component shall be made during outages which cause significant reductions in capacity as provided by the Contract.

(c) The energy component of the Base Charge shall be a mills per kWh amount determined by (1) multiplying the estimated average annual revenue requirements developed pursuant to paragraphs (b), (c), and (d) of § 904.5 of these General Regulations by 50 percent and (2) dividing the results of that multiplication by the average annual kWh estimated to be available from the Project. The energy component of the Base Charge shall be applied to each kWh made available to each Contractor, as provided for by Contract, except for the energy purchased by Western, at the request of a Contractor, to meet that Contractor's deficiency in Firm Energy pursuant to section 105(a)(2) of the Hoover Power Plant Act (43 U.S.C. 619(a)(2)) and section F of the Conformed Criteria, and that Contractor's Uprating Program credit carry forward, as provided by Contract.

(d) Application of the Base Charge to capacity and energy overruns will be provided for by Contract. The capacity component and the energy component of the Base Charge shall be applied each billing period for each Contractor.

(e) The Base Charge shall be reviewed annually. The Base Charge shall be adjusted either upward or downward, when necessary and administratively feasible, to assure sufficient revenues to effect payment of all costs and financial obligations associated with the Project pursuant to paragraphs (b), (c), and (d) of § 904.5 of these General Regulations. The Administrator shall provide all Contractors an opportunity to comment on any proposed adjustment to the Base Charge pursuant to the DOE's power rate adjustment procedures then in effect.

§ 904.8 Lower basin development fund contribution charge.

(a) The Lower Basin Development Fund Contribution Charge will be developed by the Administrator of Western on the basis that the equivalent of 4 1/2 mills or 2 1/2 mills per kWh, as appropriate, required to be included in the rates charged to purchasers pursuant to section 1543(c)(2) of the Basin Act, as amended by the Hoover Power Plant Act, shall be collected from the energy sales of the Project.

(b) The Lower Basin Development Fund Contribution Charge shall be applied to each kWh made available to each Contractor, as provided for by Contract, except for the energy purchased by Western at the request of a Contractor to meet:

(1) That Contractor's deficiency in Firm Energy, pursuant to section 105(a)(2) of the Hoover Power Plant Act (43 U.S.C. 619(a)(2)) and section F of the Conformed Criteria; and

(2) That Contractor's Uprating Program credit carry forward as provided by Contract. A 4 1/2 mills per kWh charge shall be applied to each kWh made available to an Arizona Contractor, and a 2 1/2 mills per kWh charge shall be applied to each kWh made available to a California or Nevada Contractor; provided, that after the repayment period of the Central Arizona Project, a 2 1/2 mills per kWh charge shall be applied to each kWh made available to the Arizona, California, and Nevada Contractors. The Lower Basin Development Fund Contribution Charge shall be applied to energy overruns. The Lower Basin Development Fund Contribution Charge shall be applied each billing period for each Contractor.

§ 904.9 Excess capacity.

(a) If the Uprating Program results in Excess Capacity, Western shall be entitled to such Excess Capacity to integrate the operation of the Boulder City Area Projects and other Federal Projects on the Colorado River. Specific criteria for the use of Excess Capacity by Western will be provided by Contract. All Excess Capacity not required by Western for the purposes specified by Contract will be available to all Contractors at no additional cost on a pro rata basis based on the ratio of each Contractor's Capacity allocation to the total Capacity allocation.

(b) Credits for benefits resulting from project integration shall be determined by Western and such benefits shall be apportioned in accordance with paragraph (9) of § 904.5 of these General Regulations.

§ 904.10 Excess energy.

(a) If excess Energy is determined by the United States to be available, it shall be made available to the Contractors, in accordance with the priority entitlement of section 105(a)(1)(C) of the Hoover Power Plant Act (43 U.S.C. 619(a)(1)(c)). After the annual first- and second-priority entitlement to excess energy has been obligated for delivery, Western will make available one-third of the third-priority excess energy to the Arizona Power Authority, one-third to the Colorado River Commission of Nevada, and one-third to the California Contractors.

(b) Western will make available third-priority excess energy to the California Contractors based on the following formula:

F = 1/2 (A/B + C/D) (E); Where:

A = Contractor's allocated Capacity B = Total California allocated Capacity C = Contractor's allocated Firm Energy D = Total California allocated Firm Energy E = Third-priority Excess Energy available to California F = Contractor's third-priority Excess Energy

(c) The charge for all Excess Energy shall be the charge for Boulder Canyon Project Firm Energy existing at the time the Excess Energy is made available to the Contractor, including the appropriate Lower Basin Development Fund Contribution Charge.

§ 904.11 Lay off of energy.

(a) If any Contractor determines that it is temporarily unable to utilize Firm Energy or Excess Energy, Western will, at the Contractor's request, attempt to lay off the Firm Energy or Excess Energy the Contractor declares to be available for lay off, pursuant to the provisions for lay off of energy specified in the Contract.

(b) If Western is unable to lay off such energy, or if the Contractor fails to request Western to attempt to lay off the energy, the Contractor will be billed for the Firm Energy or Excess Energy that was available to the Contractor but could not be delivered to the Contractor or sold to another customer.

(c) In the event that Western must lay off the Firm Energy or Excess Energy at a rate lower than the effective Firm Energy rate, the Contractor will be billed for the difference between the amount that Western would have received at the then existing Firm Energy rate, including the appropriate Lower Basin Development Fund Contribution Charge, and the amount actually received.

§ 904.12 Payments to contractors.

(a) Funds advanced to the Secretary of the Interior for the Uprating Program and costs reasonably incurred by the Contractor in advancing such funds, as approved by Western, shall be returned to the Contractor advancing the funds during the Contract period through credits on that Contractor's power bills. Appropriate credits will be developed and applied pursuant to terms and conditions agreed to by contract or agreement.

(b) All other obligations of the United States to return funds to a Contractor shall be repaid to such Contractor through credits on power bills, with or without interest, pursuant to terms and conditions agreed to by contract or agreement.

§ 904.13 Disputes.

(a) All actions by the Secretary of Energy, acting by and through the Administrator of Western, shall be binding unless or until reversed or modified in accordance with provisions contained herein.

(b) Any disputes or disagreements as to interpretation or performance of the provisions of these General Regulations under the responsibility of Western shall first be presented to and decided by the Administrator. The Administrator shall be deemed to have denied the Contractor's contention or claim if it is not acted upon within ninety (90) days of its having been presented.

(c) The decision of the Administrator shall be final unless, within thirty (30) days from the date of such decision, a written request for arbitration is received by the Administrator. The Administrator shall have ninety (90) days from the date of receipt of a request for arbitration either to concur in or deny in writing the request for such arbitration. Failure by the Administrator to take any action within the ninety (90) day period shall be deemed a denial of the request for arbitration. In the event of a denial of a request for arbitration, the decision of the Administrator shall become final. Upon a decision becoming final, the disputing Contractor's remedy lies with the appropriate Federal court. Any claim that a final decision of the Administrator violates any right accorded the Contractor under the Project Act, the Adjustment Act, or Title I of the Hoover Power Plant Act is barred unless suit asserting such claim is filed in a Federal court of competent jurisdiction within one (1) year after final refusal by the Administrator to correct the action complained of, in accordance with section 105(h) of the Hoover Power Plant Act.

(d) When a timely request for arbitration is received by the Administrator and the Administrator concurs in writing, the disputing Contractor and the Administrator shall, within thirty (30) days after receipt of notice of such concurrence, each name one arbitrator to the panel of arbitrators which will decide the dispute. All arbitrators shall be skilled and experienced in the field pertaining to the dispute. In the event there is more than one disputing Contractor, the disputing Contractors shall collectively name one arbitrator to the panel of arbitrators. In the event of their failure collectively to name such an arbitrator within fifteen (15) days after their first meeting, that arbitrator shall be named as provided in the Commercial Arbitration Rules of the American Arbitration Association. The two arbitrators thus selected shall name a third arbitrator within thirty (30) days of their first meeting. In the event of their failure to so name such third arbitrator, that arbitrator shall be named as provided in the Commercial Arbitration Rules of the American Arbitration Association. The third arbitrator shall act as chairperson of the panel. The arbitration shall be governed by the Commercial Arbitration Rules of the American Arbitration Association. The arbitration shall be limited to the issue submitted. The panel of arbitrators shall not rewrite, change, or amend these General Regulations or the Contracts of any of the parties to the dispute. The panel of arbitrators shall render a final decision in this dispute within sixty (60) days after the date of the naming of the third arbitrator. A decision of any two of the three arbitrators named to the panel shall be final and binding on all parties involved in the dispute.

§ 904.14 Future regulations.

(a) Western may from time to time promulgate such additional or amendatory regulations as deemed necessary for the administration of the Project in accordance with applicable law; Provided, That no right under any Contract shall be impaired or obligation thereunder be extended thereby.

(b) Any modification, extension, or waiver of any provision of these General Regulations granted for the benefit of any one or more Contractors shall not be denied to any other Contractor.

(c) Western reserves the right to terminate, modify, or extend these regulations, either partially or in their entirety, to the extent permitted by law or existing contract.

PART 905 ENERGY PLANNING AND MANAGEMENT PROGRAM

Authority: 42 U.S.C. 7152, 7191; 42 U.S.C. 7275-7276c.

Source: 60 FR 54174, Oct. 20, 1995, unless otherwise noted.

Subpart A General Provisions

Source: 65 FR 16795, Mar. 30, 2000, unless otherwise noted.

§ 905.1 What are the purposes of the Energy Planning and Management Program?

The purposes of the Energy Planning and Management Program (EPAMP) are to meet the objectives of Section 114 of the Energy Policy Act of 1992 (EPAct) and to extend long-term firm power resource commitments while supporting customer integrated resource planning (IRP); demand-side management (DSM), including energy efficiency, conservation, and load management; and the use of renewable energy. Subpart B, Integrated Resource Planning, allows customers of the Western Area Power Administration (Western) to meet the objectives of section 114 of EPAct through integrated resource planning or by other means, such as attaining a minimum level of investment in energy efficiency and/or renewable energy, collecting a charge to support defined public benefits, or complying with a mandated energy efficiency and/or renewable energy reporting requirement.

§ 905.2 What are the key definitions of this part?

Administrator means Western's Administrator.

Customer means any entity that purchases firm capacity, with or without energy, from Western under a long-term firm power contract. The term also includes a member-based association (MBA) and its distribution or user members that receive direct benefit from Western's power, regardless of which holds the contract with Western.

Energy efficiency and/or renewable energy (EE/RE) report means the report documenting energy efficiency and/or renewable energy activities imposed by a State, Tribal, or the Federal Government upon a State, Tribal, or Federal end-use customer within its jurisdiction.

Integrated resource planning means a planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to a customer's electric consumers.

Integrated resource planning cooperative (IRP cooperative) means a group of Western's customers and/or their distribution or user members with geographic, resource supply, or other similarities that have joined together, with Western's approval, to complete an IRP.

Member-based association (MBA) means:

(1) An entity composed of member utilities or user members, or

(2) An entity that acts as an agent for, or subcontracts with, but does not assume power supply responsibility for its principals or subcontractors, who are its members.

Minimum investment report means the report documenting a mandatory minimum level of financial or resource investment in demand-side management (DSM) initiatives, including energy efficiency and load management, and/or renewable energy activities, such as investment of a set minimum percentage of the utility's gross revenues in renewable energy, which is imposed by State, Tribal, or Federal law upon a customer under its jurisdiction. For the purposes of this part, the minimum investment report includes reports about public benefits charges, as well.

Public benefits charge means a mandatory financial charge imposed by State, Tribal, or Federal law upon a customer under its jurisdiction to support one or more of the following: energy efficiency, conservation, or demand-side management; renewable energy; efficiency or alternative energy-related research and development; low-income energy assistance; and/or other similar programs defined by applicable State, Tribal, or Federal law. This term is also known as a public goods or system benefit charge in the utility industry.

Region means a Western regional office or management center, and the geographic territory served by that regional office or management center: the Desert Southwest Customer Service Region, the Rocky Mountain Customer Service Region, the Sierra Nevada Customer Service Region, the Upper Great Plains Customer Service Region, or the Colorado River Storage Project Management Center.

Renewable energy means any source of electricity that is self-renewing, including plant-based biomass, waste-based biomass, geothermal, hydropower, ocean thermal, solar (active and passive), and wind.

Small customer means a utility customer with total annual sales and usage of 25 gigawatthours (GWh) or less, as averaged over the previous 5 years, which is not a member of a joint-action agency or generation and transmission cooperative with power supply responsibility; or any end-use customer.

Western means the Western Area Power Administration.

Subpart B Integrated Resource Planning

Source: 65 FR 16796, Mar. 30, 2000, unless otherwise noted.

§ 905.10 Who must comply with the integrated resource planning and reporting regulations in this subpart?

(a) Integrated resource plans (IRP) and alternatives. Each Western customer must address its power resource needs in an IRP prepared and submitted to Western as described in this subpart. Alternatively, Western customers may submit a small customer plan, minimum investment report or EE/RE report as provided in this subpart.

(b) Rural Utility Service and state utility commission reports. For customers subject to IRP filings or other electrical resource use reports from the Rural Utilities Service or a state utility commission, nothing in this part requires a customer to take any action inconsistent with those requirements.

§ 905.11 What must an IRP include?

(a) General. Integrated resource planning is a planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to a customer's electric consumers. An IRP supports customer-developed goals and schedules. The plan must take into account necessary features for system operation, such as diversity, reliability, dispatchability, and other risk factors; must take into account the ability to verify energy savings achieved through energy efficiency and the projected durability of such savings measured over time; and must treat demand and supply resources on a consistent and integrated basis.

(b) IRP criteria. IRPs must consider electrical energy resource needs and may consider, at the customer's option, water, natural gas, and other energy resources. Each IRP submitted to Western must include:

(1) Identification of resource options. Identification and comparison of resource options is an assessment and comparison of existing and future supply-and demand-side resource options available to a customer based upon its size, type, resource needs, geographic area, and competitive situation. Resource options evaluated by the specific customer must be identified. The options evaluated should relate to the resource situation unique to each Western customer as determined by profile data (such as service area, geographical characteristics, customer mix, historical loads, projected growth, existing system data, rates, and financial information) and load forecasts. Specific details of the customer's resource comparison need not be provided in the IRP itself. They must, however, be made available to Western upon request.

(i) Supply-side options include, but are not limited to, purchased power contracts and conventional and renewable generation options.

(ii) Demand-side options alter the customer's use pattern to provide for an improved combination of energy services to the customer and the ultimate consumer.

(iii) Considerations that may be used to develop potential options include cost, market potential, consumer preferences, environmental impacts, demand or energy impacts, implementation issues, revenue impacts, and commercial availability.

(iv) The IRP discussion of resource options must describe the options chosen by the customer, clearly demonstrating that decisions were based on a reasonable analysis of the options. The IRP may strike a balance among the applicable resource evaluation factors.

(2) Action plan. IRPs must include an action plan describing specific actions the customer will take to implement its IRP.

(i) The IRP must state the time period that the action plan covers, and the action plan must be updated and resubmitted to Western when this time period expires. The customer may submit a revised action plan with the annual IRP progress report discussed in § 905.14.

(ii) For those customers not experiencing or anticipating load growth, the action plan requirement for the IRP may be satisfied by a discussion of current actions and procedures in place to periodically reevaluate the possible future need for new resources. The action plan must include a summary of:

(A) Actions the customer expects to take in accomplishing the goals identified in the IRP;

(B) Milestones to evaluate accomplishment of those actions during implementation; and

(C) Estimated energy and capacity benefits for each action planned.

(3) Environmental effects. To the extent practical, the customer must minimize adverse environmental effects of new resource acquisitions and document these efforts in the IRP. Customers are neither precluded from nor required to include a quantitative analysis of environmental externalities as part of the IRP process. IRPs must include a qualitative analysis of environmental effects in summary format.

(4) Public participation. The customer must provide ample opportunity for full public participation in preparing and developing an IRP (or any IRP revision or amendment). The IRP must include a brief description of public involvement activities, including how the customer gathered information from the public, identified public concerns, shared information with the public, and responded to public comments. Customers must make additional documentation identifying or supporting the full public process available to Western upon request.

(i) As part of the public participation process for an MBA, the governing body of an MBA must approve the IRP in accordance with the MBA's by-laws, confirming that all requirements have been met. To indicate approval in the case of an individual IRP submitted by an entity with a board of directors or city council, a responsible official must sign the IRP submitted to Western or the customer must document passage of an approval resolution by the appropriate governing body included or referred to in the IRP.

(ii) For Western customers that do not purchase electricity for resale, such as some State, Tribal, and Federal agencies, the customer can satisfy the public participation requirement by having a top management official with resource acquisition responsibility review and concur on the IRP. The customer must note this concurrence in the IRP.

(5) Load forecasting. An IRP must include a statement that the customer conducted load forecasting. Load forecasting should include data that reflects the size, type, resource conditions, and demographic nature of the customer using an accepted load forecasting method, including but not limited to the time series, end-use, and econometric methods. The customer must make the load forecasting data available to Western upon request.

(6) Measurement strategies. The IRP must include a brief description of measurement strategies for options identified in the IRP to determine whether the IRP's objectives are being met. These validation methods must include identification of the baseline from which a customer will measure the benefits of its IRP implementation. A reasonable balance may be struck between the cost of data collection and the benefits resulting from obtaining exact information. Customers must make performance validation and evaluation data available to Western upon request.

(c) IRP criteria for certain customers not qualifying for “small customer” status. Customers with limited economic, managerial, and resource capability and total annual sales and usage of 25 gigawatthours (GWh) or less who are members of joint-action agencies and generation and transmission cooperatives with power supply responsibility are eligible for the criteria specified in paragraphs (c)(1) and (c)(2) of this section.

(1) Each IRP submitted by a customer under paragraph (c) of this section must:

(i) Consider all reasonable opportunities to meet future energy service requirements using DSM techniques, renewable energy resources, and other programs; and

(ii) Minimize, to the extent practical, adverse environmental effects.

(2) Each IRP submitted by a customer under paragraph (c) of this section must include, in summary form:

(i) Customer name, address, phone number, email and Website if applicable, and contact person;

(ii) Customer type;

(iii) Current energy and demand profiles, and data on total annual energy sales and usage for the past 5 years, which Western will use to verify that customers qualify for these criteria;

(iv) Future energy services projections;

(v) How items in paragraphs (c)(1)(i) and (c)(1)(ii) of this section were considered; and

(vi) Actions to be implemented over the customer's planning timeframe.

[65 FR 16795, Mar. 30, 2000, as amended at 73 FR 35062, June 20, 2008]

§ 905.12 How must IRPs be submitted?

(a) Number of IRPs submitted. Except as provided in paragraph (c) of this section, one IRP is required per customer, regardless of the number of long-term firm power contracts between the customer and Western.

(b) Method of submitting IRPs. Customers must submit IRPs to Western under one of the following options:

(1) Customers may submit IRPs individually.

(2) MBAs may submit IRPs for each of their members or submit one IRP on behalf of all or some of their members. An IRP submitted by an MBA must specify the responsibilities and participation levels of individual members and the MBA. Any member of an MBA may submit an individual IRP to Western instead of being included in an MBA IRP.

(3) Customers may submit IRPs as regional/IRP cooperatives when previously approved by Western. Western encourages customers to prepare “regional” IRPs. Regional IRPs are voluntary and participants need not be members of an MBA or a Western customer. Regional/IRP cooperatives may also submit small customer plans, minimum investment reports, and EE/RE reports on behalf of eligible IRP cooperative members.

(c) Alternatives to submitting individual IRPs. Customers with Western approval to submit small customer plans, minimum investment or EE/RE reports may substitute the applicable plan or report instead of an IRP. Each customer that intends to seek approval for IRP cooperative, small customer, minimum investment report or EE/RE report status must provide advance written notification to Western. A new customer must provide this notification to the Western Regional Manager of the Region in which the customer is located within 30 days from the time it becomes a customer. Any customer may resubmit an IRP or notify Western of its plan to change its compliance method at any time so long as there is no period of noncompliance.

[65 FR 16795, Mar. 30, 2000, as amended at 73 FR 35062, June 20, 2008]

§ 905.13 When must IRPs be submitted?

(a) Submitting the initial IRP. Except as provided in paragraph (c) of this section, customers that have not previously had an IRP approved by Western must submit the initial IRP to the appropriate Regional Manager no later than 1 year after May 1, 2000, or after becoming a customer, whichever is later.

(b) Updates and amendments to IRPs. Customers must submit updated IRPs to the appropriate Regional Manager every 5 years after Western's approval of the initial IRP. Customers that complied with Western's IRP regulations in effect before May 1, 2000 must maintain their submission and resubmission schedules previously in effect. Customers may submit amendments and revisions to IRPs at any time.

(c) IRP cooperatives. Customers with geographic, resource supply, and other similarities may join together and request, in writing, Western's approval to become an IRP cooperative. Western will respond to IRP cooperative status requests within 30 days of receiving a request. If Western disapproves a request for IRP cooperative status, the requesting participants must maintain their currently applicable integrated resource or small customer plans, or submit the initial IRPs no later than 1 year after the date of the disapproval letter. Western's approval of IRP cooperative status will not be based on any potential participant's contractual status with Western. Each IRP cooperative must submit an IRP for its participants within 18 months after Western approves IRP cooperative status.

§ 905.14 Does Western require annual IRP progress reports?

Yes, customers must submit IRP progress reports each year within 30 days of the anniversary date of the approval of the currently applicable IRP. The reports must describe the customer's accomplishments achieved under the action plan, including projected goals and implementation schedules, and energy and capacity benefits and renewable energy developments achieved as compared to those anticipated. Western prefers measured values, but will accept reasonable estimates if measurement is infeasible or not cost-effective. Instead of a separate progress report, the customer may use any other annual report that the customer submits to Western or another entity, at the customer's discretion, if that report contains all required data for the previous full year and is submitted within 30 days of the approval anniversary date of the currently applicable IRP. With Western's approval, customers may submit reports outside of the 30-day anniversary date window.

§ 905.15 What are the requirements for the small customer plan alternative?

(a) Requesting small customer status. Small customers may submit a request to prepare a small customer plan instead of an IRP. Requests for small customer status from electric utilities must include data on total annual energy sales and usage for the 5 years prior to the request. Western will average this data to determine overall annual energy sales and usage so that uncontrollable events, such as extreme weather, do not distort levelized energy sales and usage. Requests from end-use customers must only document that the customer does not purchase electricity for resale. Western will respond to small customer status requests within 30 days of receiving the request. If Western disapproves a request, the customer must maintain its currently applicable IRP, or submit the initial IRP no later than 1 year after the date of the disapproval letter. Alternatively, the customer may submit a request for minimum investment report or EE/RE report status, as appropriate.

(b) Small customer plan contents. Small customer plans must:

(1) Consider all reasonable opportunities to meet future energy service requirements using demand-side management techniques, renewable energy resources, and other programs that provide retail consumers with electricity at reasonable cost;

(2) Minimize, to the extent practical, adverse environmental effects; and

(3) Present in summary form the following information:

(i) Customer name, address, phone number, email and Website if applicable, and contact person;

(ii) Type of customer;

(iii) Current energy and demand profiles and data on total annual energy sales and usage for the previous 5 years for utility customers, or current energy and demand use for end-use customers;

(iv) Future energy services projections;

(v) How items in paragraphs (b)(1) and (b)(2) of this section were considered; and

(vi) Actions to be implemented over the customer's planning timeframe.

(c) When to submit small customer plans. Small customers must submit the first small customer plan to the appropriate Western Regional Manager within 1 year after Western approves the request for small customer status. Small customers must submit, in writing, a small customer plan every 5 years.

(d) Maintaining small customer status. (1) Every year on the anniversary of Western's approval of the plan, small customers must submit a letter to Western verifying that either their annual energy sales and usage is 25 GWh or less averaged over the previous 5 years, or they continue to be end-use customers. The letter must also identify their achievements against targeted action plans, as well as the revised summary of actions if the previous summary of actions has expired.

(2) Western will use the letter for overall program evaluation and comparison with the customer's plan, and for verification of continued small customer status. Customers may submit annual update letters outside of the anniversary date if previously agreed to by Western so long as the letter contains all required data for the previous full year.

(e) Losing eligibility for small customer status. (1) A customer ceases to be a small customer if it:

(i) Is a utility customer and exceeds total annual energy sales and usage of 25 GWh, as averaged over the previous 5 years; or

(ii) Is no longer an end-use customer.

(2) Western will work with a customer that loses small customer status to develop an appropriate schedule for submitting an IRP or other report required under this subpart.

§ 905.16 What are the requirements for the minimum investment report alternative?

(a) Request to submit the minimum investment report. Customers may submit a request to prepare a minimum investment report instead of an IRP. Minimum investment reports may be submitted by MBAs on behalf of the MBA or its members, and by IRP cooperatives on behalf of its participants. Requests to submit minimum investment reports must include data on:

(1) The source of the minimum investment requirement (number, title, date, and jurisdiction of law);

(2) The initial, annual, and other reporting requirement(s) of the mandate, if any; and

(3) The mandated minimum level of investment or public benefits charge for DSM and/or renewable energy.

(b) Minimum investment requirement. The minimum investment must be either:

(1) A mandatory set percentage of customer gross revenues or other specific minimum investment in DSM and/or renewable energy mandated by a State, Tribal, or Federal Government with jurisdictional authority; or

(2) A required public benefits charge, including charges to be collected for and spent on DSM; renewable energy; efficiency and alternative energy-related research and development; low-income energy assistance; and any other applicable public benefits category, mandated by a State, Tribal, or Federal Government with jurisdictional authority. Participation in a public benefits program requires either a mandatory set percentage of customer gross revenues or other specific charges to be applied toward the programs as determined by the applicable State, Tribal, or Federal authority. The revenues from the public benefits charge may be expended directly by the customer, or by another entity on behalf of the customer as determined by the applicable State, Tribal, or Federal authority.

(c) Multi-state entities. For those customers with service territories lying in more than one State or Tribal jurisdiction, and where at least one of the States or Tribal jurisdictions has a mandated minimum investment requirement, to meet this alternative customers must use the highest requirement from the State or Tribe within the customer's service territory and additionally apply it to all members in those States or Tribal jurisdictions in which there is no requirement. Alternatively, if each State or Tribe has a requirement, customers may satisfy Western's requirement by reporting on compliance with each applicable minimum investment requirement. Western will work with multi-state entities to ensure the most effective, and least burdensome, compliance mechanism.

(d) Western's response to minimum investment report requests. Western will respond to requests to accept minimum investment reports within 30 days of receiving the request. If Western disapproves a request to allow use of the minimum investment report, the customer must maintain its currently applicable IRP or small customer plan, or submit its initial IRP no later than 1 year after the date of the disapproval letter. Alternatively, the customer may submit a request for small customer plan or EE/RE report status, as appropriate.

(e) Minimum investment report contents. Reports documenting compliance with a minimum level of investment in DSM and/or renewable energy must include:

(1) Customer name, address, phone number, email and Website if applicable, and contact person;

(2) Authority or requirement to undertake a minimum investment, including the source of the minimum investment requirement (number, title, date, and jurisdiction of law or regulation); and

(3) A description of the minimum investment, including:

(i) Minimum percentage or other minimum requirement for DSM and/or renewable energy, including any charges to be collected for and spent on DSM, renewable energy, efficiency or alternative energy-related research and development, low-income energy assistance, and any other applicable public benefits categories;

(ii) Actual or estimated energy and/or capacity savings resulting from minimum investments in DSM, if known;

(iii) Actual or estimated energy and/or capacity resulting from minimum investments in renewable energy, if known; and

(iv) A description of the DSM and/or renewable energy activities to be undertaken over the next 2 years as a result of the requirement for minimum investment, if known.

(f) Minimum investment report approval. Western will approve the minimum investment report when it meets the requirements in paragraph (e) of this section.

(g) When to submit the minimum investment report. The customer must submit the first minimum investment report to the appropriate Western Regional Manager within 1 year after Western approves the request to accept the minimum investment report. Customers choosing this option must maintain IRP or small customer plan compliance with Western's IRP regulations in effect before May 1, 2000, including submitting annual progress reports or update letters, until submitting the first minimum investment report, to ensure there is no gap in complying with section 114 of EPAct. Customers must submit, in writing, a minimum investment report every 5 years.

(h) Maintaining minimum investment reports. (1) Every year on the anniversary of Western's approval of the first minimum investment report, customers choosing this option must submit a letter to Western verifying that they remain in compliance with the minimum investment requirement. The letter must also contain summary information identifying annual energy and capacity savings associated with minimum investments in DSM, if known, and energy and capacity associated with minimum investments in renewable energy, if known. The letter must also include a revised description of customer DSM and/or renewable energy activities if the description from the minimum investment report has changed or expired.

(2) Western will use the letter for overall program evaluation and to ensure customers remain in compliance. Customers may submit letters outside of the anniversary date if previously agreed to by Western, and if the letter contains all required data for the previous full year. Instead of a separate letter, a customer choosing this option may submit the State, Tribal, or Federal required annual report documenting the minimum investment and associated DSM and/or renewable energy savings and/or use, if known.

(i) Loss of eligibility to submit the minimum investment report. (1) A customer ceases to be eligible to submit a minimum investment report if:

(i) A State, Tribal, or Federal mandate no longer applies to the customer, or

(ii) The customer does not comply with the minimum level of investment in applicable State, Tribal, or Federal law.

(2) Western will work with a customer no longer eligible to submit a minimum investment report to develop an appropriate schedule to submit an IRP or other plan or report required under this subpart.

§ 905.17 What are the requirements for the energy efficiency and/or renewable energy report (EE/RE report) alternative?

(a) Requests to submit an EE/RE report. End-use customers may submit a request to prepare an EE/RE report instead of an IRP. Requests to submit EE/RE reports must include data on:

(1) The source of the EE/RE reporting requirement (number, title, date, and jurisdiction of law or regulation);

(2) The initial, annual, and other reporting requirement(s) of the report; and

(3) A summary outline of the EE/RE report's required data or components, including any requirements for documenting customer energy efficiency and renewable energy activities.

(b) EE/RE report requirement. The EE/RE report is based on a mandate by a State, Tribal, or Federal Government to implement energy efficiency and/or renewable energy activities within a specified timeframe, for which there is also an associated reporting requirement. The EE/RE report may include only electrical resource use and energy efficiency and/or renewable energy activities, or may additionally include other resource information, such as water and natural gas data. At a minimum, the EE/RE report must annually document energy efficiency and/or renewable energy activities undertaken by the end-use customer.

(c) Western's response to EE/RE report requests. Western will respond to requests to accept EE/RE reports within 30 days of receiving the request. If Western disapproves a request to allow use of the EE/RE report, the customer must maintain its currently applicable IRP or small customer plan, or submit its initial IRP no later than 1 year after the date of the disapproval letter. Alternatively, the customer may submit a request for small customer plan or minimum investment report, as appropriate, within 30 days after the date of the disapproval letter.

(d) EE/RE report contents. EE/RE reports must include:

(1) Customer name, address, phone number, email and Website if applicable, and contact person;

(2) Authority or requirement to complete the EE/RE report, including the source of the requirement (number, title, date, and jurisdiction of law); and

(3) A description of the customer's required energy efficiency and/or renewable energy activities, including:

(i) Level of investment or expenditure in energy efficiency and/or renewable energy, and quantifiable energy savings or use goals, if defined by the EE/RE reporting requirement;

(ii) Annual actual or estimated energy and/or capacity savings, if any, associated with energy efficiency and resulting from the EE/RE reporting requirement;

(iii) Actual or estimated energy and/or capacity, if any, associated with renewable energy and resulting from the EE/RE reporting requirement;

(iv) A description of the energy efficiency and/or renewable energy activities to be undertaken over the next 2 years as a result of the EE/RE reporting requirement.

(e) EE/RE report approval. Western will approve the EE/RE report when the report meets the requirements in paragraph (d) of this section.

(f) When to submit the EE/RE report. The customer must submit the first EE/RE report to the appropriate Western Regional Manager within 1 year after Western approves the request to accept the EE/RE report. Customers choosing this option must maintain IRP or small customer plan compliance with Western's IRP regulations in effect before May 1, 2000, including submitting annual progress reports or update letters, until submitting the first EE/RE report to ensure there is no gap in complying with section 114 of EPAct. Customers must submit, in writing, an EE/RE report every 5 years.

(g) Maintaining EE/RE reports. (1) Every year on the anniversary of Western's approval of the first EE/RE report, customers choosing this option must submit an annual EE/RE letter to Western. The letter must contain summary information identifying customer annual energy and capacity savings associated with energy efficiency, if any, and annual customer energy and capacity associated with renewable energy, if any. The letter must also verify that the customer remains in compliance with the EE/RE reporting requirement. Additionally, the letter must include a revised description of customer DSM and/or renewable energy activities if the description from the EE/RE report has changed or expired. If this information is contained in an EE/RE report sent to another authority, the customer may submit that report instead of a separate letter.

(2) Customers may submit annual EE/RE letters outside of the anniversary date if previously agreed to by Western if the letter contains all required data for the previous full year.

(h) Loss of eligibility to submit the EE/RE report. (1) A customer ceases to be eligible to submit a EE/RE report if:

(i) The EE/RE reporting requirement no longer applies to the customer, or

(ii) The customer does not comply with the EE/RE reporting requirements in applicable State, Tribal, or Federal law.

(2) Western will work with a customer no longer eligible to submit an EE/RE report to develop an appropriate schedule to submit a small customer plan or other plan or report required under this subpart.

§ 905.18 What are the criteria for Western's approval of submittals?

(a) Approval criteria. Western will approve all plans and reports based upon:

(1) Whether the plan or report satisfactorily addresses the criteria in the regulations in this subpart; and

(2) The reasonableness of the plan or report given the size, type, resource needs, geographic area, and competitive situation of the customer.

(b) Review of resource choices. Western will review resource choices using section 114 of EPAct and this subpart. Western will disapprove plans and reports if Western deems that they do not meet the reasonableness criteria in paragraph (a)(2) of this section or the provisions of section 114 of EPAct.

(c) Accepting plans and reports under other initiatives. If a customer or group of customers implements integrated resource planning under a program responding to other Federal, Tribal, or State initiatives, Western will accept and approve the plan or report as long as it substantially complies with the requirements of this subpart.

(d) Water-based plans and reports. In evaluating a plan or report, Western will consider water planning, efficiency improvements, and conservation in the same manner it considers energy planning and efficiencies. Customers that provide water utility services and customers that service irrigation load as part of their overall load may include water conservation activities in their plans or reports. To the extent practical, customers should convert reported water savings to energy values.

§ 905.19 How are plans and reports reviewed and approved?

Western will review all plans and reports submitted under this subpart and notify the submitting entity of the plan's or report's acceptability within 120 days after receiving it. If a plan or report submittal is insufficient, Western will provide a notice of deficiencies to the entity that submitted the plan or report. Western, working together with the entity, will determine the time allowable for resubmitting the plan or report. However, the time allowed for resubmittal will not be greater than 9 months after the disapproval date, unless otherwise provided by applicable contract language.

§ 905.20 When are customers in noncompliance with the regulations in this subpart, and how does Western ensure compliance?

(a) Good faith effort to comply. If it appears that a customer's activities may be inconsistent with the applicable IRP, small customer plan, minimum investment report or EE/RE report, Western will notify the customer and offer the customer 30 days to provide evidence of its good faith effort to comply. If the customer does not correct the specified deficiency or submit such evidence, or if Western finds, after receiving information from the customer, that a good faith effort has not been made, Western will impose a penalty.

(b) Penalties for noncompliance. Western will impose a penalty on long-term firm power customers for failing to submit or resubmit an acceptable IRP and action plan, small customer plan, minimum investment report or EE/RE report as required by this subpart. Western will also impose a penalty when the customer's activities are not consistent with the applicable plan or report unless Western finds that a good faith effort has been made to comply with the approved plan or report.

(c) Written notification of penalty. Western will provide written notice of a penalty to the customer, and to the MBA or IRP cooperative when applicable. The notice will specify the reasons for the penalty.

(d) Penalty options. (1) Beginning with the first full billing period following the notice specified in paragraph (c) of this section, Western will impose a surcharge of 10 percent of the monthly power charges until the deficiency specified in the notice is cured, or until 12 months pass. However, Western will not immediately impose a penalty if the customer or its MBA or IRP cooperative requests reconsideration by filing a written appeal under § 905.21.

(2) The surcharge increases to 20 percent for the second 12 months and to 30 percent per year thereafter until the deficiency is cured.

(3) After the first 12 months of the surcharge and instead of imposing any further surcharge, Western may impose a penalty that would reduce the resource delivered under a customer's long-term firm power contract(s) by 10 percent. Western may impose this resource reduction either:

(i) When it appears to be more effective to ensure customer compliance, or

(ii) When such reduction may be more cost-effective for Western.

(4) The penalty provisions in existing contracts will continue to be in effect and administered and enforced according to applicable contract provisions.

(e) Assessing and ceasing penalties. Western will assess the surcharge on the total charges for all power obtained by a customer from Western and will not be limited to surcharges on only firm power sales. When a customer resolves the deficiencies, Western will cease imposing the penalty, beginning with the first full billing period after compliance is achieved.

(f) Penalties on MBAs and IRP cooperatives. In situations involving a plan or report submitted by an MBA on behalf of its members where a single member does not comply, Western will impose a penalty upon the MBA on a pro rata basis in proportion to that member's share of the total MBA's power received from Western. In situations involving noncompliance by a participant of an IRP cooperative, Western will impose any applicable penalty directly upon that participant if it has a firm power contract with Western. If the IRP cooperative participant does not have a firm power contract with Western, then Western will impose a penalty upon the participant's MBA on a pro rata basis in proportion to that participant's share of the total MBA's power received from Western.

§ 905.21 What is the administrative appeal process?

(a) Filing written appeals with Western. If a customer disagrees with Western's decision on the acceptability of its IRP, small customer plan, minimum investment report or EE/RE report submittal, its compliance with an approved plan or report, or any other compliance issue, the customer may request reconsideration by filing a written appeal with the appropriate Regional Manager. Customers may submit appeals any time such disagreements occur and should be specific as to the nature of the issue, the reasons for the disagreement, and any other pertinent facts the customer believes should be brought to Western's attention. The Regional Manager will respond within 45 days of receiving the appeal. If resolution is not achieved at the Regional Office level, the customer may appeal to the Administrator, who will respond within 30 days of receiving the appeal.

(b) Alternative dispute resolution. Upon request, Western will agree to use mutually agreeable alternative dispute resolution procedures, to the extent allowed by law, to resolve issues or disputes relating to compliance with the regulations in this subpart.

(c) Penalties during appeal. Western will not impose a penalty while an appeal process is pending. However, if the appeal is unsuccessful for the customer, Western will impose the penalty retroactively from the date the penalty would have been assessed if an appeal had not been filed.

(d) Meeting other requirements during appeal process. A written appeal or use of alternative dispute resolution procedures does not suspend other reporting and compliance requirements.

§ 905.22 How does Western periodically evaluate customer actions?

(a) Periodic review of customer actions. Western will periodically evaluate customer actions to determine whether they are consistent with the approved IRP or minimum investment report. Small customer plans and EE/RE reports are not subject to this periodic review.

(b) Reviewing representative samples of plans and reports. Western will periodically review a representative sample of IRPs and minimum investment reports, and the customer's implementation of the applicable plan or report from each of Western's Regions. The samples will reflect the diverse characteristics and circumstances of the customers that purchase power from Western. These reviews will be in addition to, and separate and apart from, the review of initial and updated IRPs and minimum investment reports to ensure compliance with this subpart.

(c) Scope of periodic reviews. Periodic reviews may consist of any combination of review of the customer's annual IRP progress reports, minimum investment letters, telephone interviews, or on-site visits. Western will document these periodic reviews and may report on the results of the reviews in Western's annual report.

§ 905.23 What are the opportunities for using the Freedom of Information Act to request plan and report data?

IRPs, small customer plans, minimum investment reports and EE/RE reports and associated data submitted to Western are subject to the Freedom of Information Act (FOIA) and may be made available to the public upon request. IRPs must be posted on a customer's publicly available Web site or on Western's Web site. Customers posting their IRPs on their own Web site must notify Western of this decision when they submit their IRP. A hotlink on Western's Web site to IRPs posted on customer Web sites gives interested parties ready access to those IRPs. Western will post on its Web site the IRPs of customers that do not post on their own Web sites. Prior to posting, Western will provide the customer the opportunity to submit its views on whether information contained in the IRP is exempt from the FOIA's mandatory public disclosure requirements. Customers may request confidential treatment of all or part of a submitted document consistent with FOIA exemptions. Western will determine whether particular information is exempt from public access. Western will not disclose to the public information it has determined to be exempt, recognizing that certain competition-related customer information may be proprietary.

[73 FR 35062, June 20, 2008]

§ 905.24 Will Western conduct reviews of this program?

Yes, Western may periodically initiate a public process to review the regulations in this subpart to determine whether they should be revised to reflect changes in technology, needs, or other developments.

Subpart C Power Marketing Initiative

§ 905.30 Purpose and applicability.

(a) The Power Marketing Initiative (PMI) provides a framework for marketing Western's long-term firm hydroelectric resources. For covered projects, Western will make a major portion of the resources currently under contract available to existing long-term firm power customers for a period of time beyond the expiration date of their current contracts.

(b) The Western projects covered by this subpart are the Pick-Sloan Missouri Basin Program—Eastern Division and the Loveland Area Projects (LAP). The PMI applies to covered projects to the extent it is consistent with other contractual and legal rights, and subject to any applicable project-specific environmental requirements.

§ 905.31 Term.

Western will extend resource commitments for 20 years from the date existing contracts expire to existing customers with long-term firm power contracts from projects identified in section 905.30(b).

§ 905.32 Resource extensions and resource pool size.

(a) Western will extend a project-specific percentage of the marketable resource, determined to be available at the time future resource extensions begin, to existing customers with long-term firm power contracts. The remaining unextended power will be used to establish project-specific resource pools. An initial level of 96 percent of the marketable resource will be extended for the Pick-Sloan Missouri Basin Program—Eastern Division and the Loveland Area Projects.

(b) At two 5-year intervals after the effective date of the extension to existing customers, Western shall create a project-specific resource pool increment of up to an additional 1 percent of the long-term marketable resource under contract at the time. The size of the additional resource pool increment shall be determined by Western based on consideration of the actual fair-share needs of eligible new customers and other appropriate purposes.

(c) The initial pool percentages shall be applied to the marketable resource determined to be available at the time future resource extensions begin. Subsequent percentages shall be applied to the resource under contract at the time.

(d) The additional resource pool increments shall be established by pro rata withdrawals, on 2 years' notice, from then-existing customers. Withdrawals could be mitigated or delayed if good water conditions exist.

(e) Once the extensions for existing customers and allocations to new customers from the resource pool have been made, additional power resources may become available for various reasons. Any additional available resources will be used as follows:

(1) If power is reserved for new customers but not allocated, or resources are offered but not placed under contract, this power will be offered on a pro rata basis to customers that contributed to the resource pool through application of the extension formula in § 905.33.

(2) If power resources become available as a result of the enhancement of existing generation, project-use load efficiency upgrades, the development of new resources, or resources turned back to Western, Western may elect to use this power to reduce the need to acquire firming resources, retain the power for operational flexibility, sell these resources on a short-term basis, or allocate the power.

(3) If resources become available due to imposition of penalties pursuant to § 905.17, Western may make such resources available within the marketing area to existing customers that are in compliance with subpart B, subject to withdrawal.

§ 905.33 Extension formula.

(a) The amount of power to be extended to an existing customer shall be determined according to this formula:

Customer Contract Rate of Delivery (CROD) today/total project CROD under contract today × project-specific percentage × marketable resource determined to be available at the time future resource extensions begin = CROD extended.

(b) Where contract rates of delivery vary by season, the formula shall be used on a seasonal basis to determine the extended power resource. A similar pro rata approach shall be used for energy extensions.

(c) Determination of the amount of resource available after existing contracts expire, if significantly different from existing resource commitments, shall take place only after an appropriate public process.

(d) The formula set forth in paragraph (a) of this section also should be used to determine the amounts of firm power subject to withdrawal at 5-year intervals after the effective date of the extension to existing customers, except that the percentage used would be up to 1 percent for each of the two withdrawal opportunities, and the formula would use the customer CROD, project CROD and the resource under contract at the time.

§ 905.34 Adjustment provisions.

Western reserves the right to adjust marketable resources committed to all customers with long-term firm power contracts only as required to respond to changes in hydrology and river operations, except as otherwise expressly provided in these regulations. Under contracts that extend resources under this PMI, existing customers shall be given at least 5 years' notice before adjustments are made. New customers may receive less notice. The earliest that any notice under this section shall become effective is the date that existing contractual commitments expire. Any adjustment shall only take place after an appropriate public process. Withdrawals to serve project use and other purposes provided for by contract shall continue to take place based on existing contract/marketing criteria principles.

§ 905.35 New customer eligibility.

(a) Allocations to new customers from the project-specific resource pools established under § 905.32 shall be determined through separate public processes in each project's marketing area. New customers receiving an allocation must execute a long-term firm power contract to receive the allocated power and are required to comply with the IRP requirements in this part. Contracts with new customers shall expire on the same date as firm power contracts with all other customers of a project.

(b) To be eligible for an allocation, a potential new customer must be a preference entity, as defined in Reclamation law, within the currently established marketing area for a project.

(c) Entities that desire to purchase power from Western for resale to consumers, including municipalities, cooperatives, public utility districts and public power districts, must have utility status. Native American tribes are not subject to this requirement. Utility status means that the entity has responsibility to meet load growth, has a distribution system, and is ready, willing, and able to purchase power from Western on a wholesale basis for resale to retail consumers. To be eligible to apply for power available from a project's initial resource pool, those entities that desire to purchase Western power for resale to consumers must have attained utility status by December 31, 1996, for the Pick-Sloan Missouri Basin Program—Eastern Division, and by September 30, 2000, for the Loveland Area Projects. To be eligible to apply for power from subsequent resource pool increments, these entities must have attained utility status no later than 3 years prior to availability of the incremental addition to the resource pool. Deadlines for attaining utility status for other projects will be established at a later date.

§ 905.36 Marketing criteria.

Western shall retain applicable provisions of existing marketing criteria for projects where resource commitments are extended beyond the current expiration date of long-term firm power sales contracts. Western must retain important marketing plan provisions such as classes of service, marketing area, and points of delivery, to the extent that these provisions are consistent with the PMI. The PMI, eligibility and allocation criteria for potential new customers, retained or amended provisions of existing marketing criteria, the project-specific resource definition, and the size of a project-specific resource pool shall constitute the future marketing plan for each project.

§ 905.37 Process.

Modified contractual language shall be required to place resource extensions under contract. Resource extensions and allocations to new customers from the initial resource pool will take effect when existing contracts expire. These dates are December 31, 2000, for the Pick-Sloan Missouri Basin Program—Eastern Division and September 30, 2004, for the Loveland Area Projects. For the Pick-Sloan Missouri Basin Program—Eastern Division, Western will offer contracts to existing customers for resource extensions no sooner than the effective date of the final regulations. For the Loveland Area Projects, existing contracts provide for potential adjustments to marketable resources in 1999. No contracts will be offered to existing customers for post-2004 Loveland Area Projects resources until the analysis of potential resource adjustments in 1999 has been completed and any adjustments are implemented. Existing power sales contracts require that this analysis be completed by 1996.

Subpart D Energy Services

§ 905.40 Technical assistance.

Western shall establish a program that provides technical assistance to customers to conduct integrated resource planning, implement applicable IRPs and small customer plans, and otherwise comply with the requirements of these regulations.

Subpart E Final Principles of Integrated Resource Planning for Western Resource Acquisition

Source: 79 FR 56481, Sept. 22, 2014, unless otherwise noted.

§ 905.50 Resource acquisition principles.

Western's resource acquisition activities will be determined by project-specific power marketing plans, hydropower production capability, and the application of the following principles of IRP:

(a) Western will consider a full range of resource options, both supply-side and demand-side, as well as renewable resource options.

(b) On a project-by-project basis, Western, through a public process involving interested stakeholders will develop criteria to be used in evaluating power resource alternatives.

(c) Evaluation criteria will address cost, environmental impact, dependability, dispatchability, risk, diversity, and the ability to verify demand-side alternatives. Evaluation criteria will be reviewed as the need for resources changes or when long-term commitments to purchase power expire.

(d) Evaluation criteria will be consistent with Western's power marketing policy, which states that Federal power is to be marketed in such a manner as to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles. The policy, found in Delegation Order No. 00-037.00A, is derived from statutes authorizing the sale of power from both Department of the Army and Department of the Interior hydroelectric projects. These statutes include section 5 of the Flood Control Act of 1944, 16 U.S.C. 825(s) and section 9(c) of the Reclamation Project Act of 1939.

(e) Resource acquisition planning will be consistent with power marketing plans and associated contractual obligations.

(f) Resource acquisition decisions will be documented and made available to Western's power customers and the public.

§ 905.51 Transmission planning principles.

Western's transmission planning is conducted to assess the capability of the Federal transmission system to provide adequate and reliable electric service to its customers and the interconnected power grid. These planning efforts occur as part of its participation in regional and sub-regional planning entities as well as Western's Open Access Transmission Tariff.

PART 950 STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS

Authority: 42 U.S.C. 2201, 42 U.S.C. 7101 et seq., and 42 U.S.C. 16014

Source: 71 FR 46325, Aug. 11, 2006, unless otherwise noted.

Subpart A General Provisions

§ 950.1 Purpose.

The purpose of this part is to facilitate the construction and full power operation of new advanced nuclear facilities by providing risk insurance for certain delays attributed to the Nuclear Regulatory Commission regulatory process or to litigation.

§ 950.2 Scope and applicability.

This part sets forth the policies and procedures for the award and administration of Standby Support Contracts between the Department and sponsors of new advanced nuclear facilities.

§ 950.3 Definitions.

For the purposes of this part:

Act means the Energy Policy Act of 2005.

Advanced nuclear facility means any nuclear facility the reactor design for which is approved after December 31, 1993, by the Nuclear Regulatory Commission (and such design or a substantially similar design of comparable capacity was not approved on or before that date).

Available indemnification means $500 million with respect to the initial two reactors and $250 million with respect to the subsequent four reactors.

Claims administrator means the official in the Department of Energy responsible for the administration of the Standby Support Contracts, including the responsibility to approve or disapprove claims submitted by a sponsor for payment of covered costs under the Standby Support Contract.

Combined license means a combined construction and operating license (COL) for an advanced nuclear facility issued by the Commission.

Commencement of construction means the point in time when a sponsor initiates the pouring of safety-related concrete for the reactor building.

Commission means the Nuclear Regulatory Commission (NRC).

Conditional Agreement means a contractual agreement between the Department and a sponsor under which the Department will execute a Standby Support Contract with the sponsor if and only if the sponsor is one of the first six sponsors to satisfy the conditions precedent to execution of a Standby Support Contract, and if funding and other applicable contractual, statutory and regulatory requirements are satisfied.

Construction means the construction activities related to the advanced nuclear facility encompassed in the time period after commencement of construction and before the initiation of fuel load for the advanced nuclear facility.

Covered cost means:

(1) Principal or interest on any debt obligation financing an advanced nuclear facility (but excluding charges due to a borrower's failure to meet a debt obligation unrelated to the delay); and

(2) Incremental costs that are incurred as a result of covered delay.

Covered delay means a delay in the attainment of full power operation of an advanced nuclear facility caused by a covered event, as defined by this section.

Covered event means an event that may result in a covered delay due to:

(1) The failure of the Commission to comply with schedules for review and approval of inspections, tests, analyses and acceptance criteria established under the combined license;

(2) The conduct of pre-operational hearings by the Commission for the advanced nuclear facility; or

(3) Litigation that delays the commencement of full power operations of the advanced nuclear facility.

Department means the United States Department of Energy.

Full power operation means the point at which the sponsor first synchronizes the advanced nuclear facility to the electrical grid.

Grant account means the account established by the Secretary that receives appropriations or non-Federal funds in an amount sufficient to cover the amount of incremental costs for which indemnification is available under a Standby Support Contract.

Incremental costs means the incremental difference between:

(1) The fair market price of power purchased to meet the contractual supply agreements that would have been met by the advanced nuclear facility but for a covered delay; and

(2) The contractual price of power from the advanced nuclear facility subject to the delay.

Initial two reactors means the first two reactors covered by Standby Support Contracts that receive a combined license and commence construction.

Litigation means adjudication in Federal, State, local or tribal courts, including appeals of Commission decisions related to the combined license process to such courts, but excluding administrative litigation that occurs at the Commission related to the combined license process.

Loan cost means the net present value of the estimated cash flows of:

(1) Payments by the government to cover defaults and delinquencies, interest subsidies, or other payments; and

(2) Payments to the government including origination and other fees, penalties and recoveries, as outlined under the Federal Credit Reform Act of 1990.

Pre-operational hearing means any Commission hearing that is provided for in 10 CFR part 52, after issuance of the combined license.

Program account means the account established by the Secretary that receives appropriations or loan guarantee fees in an amount sufficient to cover the loan costs.

Program administrator means the Department official authorized by the Secretary to represent the Department in the administration and management of the Standby Support Program, including negotiating with and entering into a Conditional Agreement or a Standby Support Contract with a sponsor.

Related party means the sponsor's parent company, a subsidiary of the sponsor, or a subsidiary of the parent company of the sponsor.

Secretary means the Secretary of Energy or a designee.

Sponsor means a person whose application for a combined license for an advanced nuclear facility has been docketed by the Commission.

Standby Support Contract means the contract that, when entered into by a sponsor and the Program Administrator pursuant to section 638 of the Energy Policy Act of 2005 after satisfaction of the conditions in § 950.12 and any other applicable contractual, statutory and regulatory requirements, establishes the obligation of the Department to compensate covered costs in the event of a covered delay subject to the terms and conditions specified in the Standby Support Contract.

Standby Support Program means the program established by section 638 of the Act as administered by the Department of Energy.

Subsequent four reactors means the next four reactors covered by Standby Support Contracts, after the initial two reactors, which receive a combined license and commence construction.

System-level construction schedule means an electronic critical path method schedule identifying the dates and durations of plant systems installation (but excluding details of components or parts installation), sequences and interrelationships, and milestone dates from commencement of construction through full power operation, using software acceptable to the Department.

Subpart B Standby Support Contract Process

§ 950.10 Conditional agreement.

(a) Purpose. The Department and a sponsor may enter into a Conditional Agreement. The Department will enter into a Standby Support Contract with the first six sponsors to satisfy the specified conditions precedent for a Standby Support Contract if and only if all funding and other contractual, statutory and regulatory requirements have been satisfied.

(b) Eligibility. A sponsor is eligible to enter into a Conditional Agreement with the Program Administrator after the sponsor has submitted to the Department the following information but before the sponsor receives approval of the combined license application from the Commission:

(1) An electronic copy of the combined license application docketed by the Commission pursuant to 10 CFR part 52, and if applicable, an electronic copy of the design certification or early site permit, or environmental report referenced or included with the sponsor's combined license application;

(2) A summary schedule identifying the projected dates of construction, testing, and full power operation;

(3) A detailed business plan that includes intended financing for the project including the credit structure and all sources and uses of funds for the project, the most recent private credit rating or other similar credit analysis for project related covered financing, and the projected cash flows for all debt obligations of the advanced nuclear facility which would be covered under the Standby Support Contract;

(4) The sponsor's estimate of the amount and timing of the Standby Support payments for debt service under covered delays; and

(5) The estimated dollar amount to be allocated to the sponsor's covered costs for principal or interest on the debt obligation of the advanced nuclear facility and for incremental costs, including whether these amounts would be different if the advanced nuclear facility is one of the initial two reactors or one of the subsequent four reactors.

(c) The Program Administrator shall enter into a Conditional Agreement with a sponsor upon a determination by the Department that the sponsor is eligible for a Conditional Agreement, the information provided by the sponsor under paragraph (b) of this section is accurate and complete, and the Conditional Agreement is consistent with applicable laws and regulations.

Effective Date Note:At 71 FR 46325, Aug. 11, 2006, § 950.10 was revised. Paragraph (b) of this section contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.

§ 950.11 Terms and conditions of the Conditional Agreement.

(a) General. Each Conditional Agreement shall include a provision specifying that the Program Administrator and the sponsor will enter into a Standby Support Contract provided that the sponsor is one of the first six sponsors to fulfill the conditions precedent specified in § 950.12, subject to certain funding requirements and limitations specified in § 950.12 and any other applicable contractual, statutory and regulatory requirements.

(b) Allocation of Coverage. Each Conditional Agreement shall include a provision specifying the amount of coverage to be allocated under the Standby Support Contract to cover principal or interest costs and to cover incremental costs, including a provision on whether the allocation shall be different if the advanced nuclear facility is one of the initial two reactors or one of the subsequent four reactors, subject to paragraphs (c) and (d) of this section. A sponsor may elect to allocate 100 percent of the coverage to either the Program Account or the Grant Account.

(c) Funding. Each Conditional Agreement shall contain a provision that the Program Account or Grant Account shall be funded in advance of execution of the Standby Support Contract and in the following manner, subject to the conditions of paragraphs (d) and (e) of this section. Under no circumstances will the amount of the coverage for payments of principal or interest under a Standby Support Contract exceed 80 percent of the total of the financing guaranteed under that Contract.

(1) The Program Account shall receive funds appropriated to the Department, loan guarantee fees, or a combination of appropriated funds and loan guarantee fees that are in an amount equal to the loan costs associated with the amount of principal or interest covered by the available indemnification. Loan costs may not be paid from the proceeds of debt guaranteed or funded by the Federal government. The parties shall specify in the Conditional Agreement the anticipated amount or anticipated percentage of the total funding in the Program Account to be contributed by appropriated funds to the Department, by the sponsor, by a non-federal source, or by a combination of these funding sources. Covered costs paid through the Program Account are backed by the full faith and credit of the United States.

(2) The Grant Account shall receive funds appropriated to the Department, funds from a sponsor, funds from a non-Federal source, or a combination of appropriated funds and funds from the sponsor or other non-Federal source, in an amount equal to the incremental costs. The parties shall specify in the Conditional Agreement the anticipated amount or anticipated percentage of the total funding in the Grant Account to be contributed by appropriated funds to the Department, by the sponsor, by a non-Federal source, or by a combination of these funding sources.

(d) Reconciliation. Each Conditional Agreement shall include a provision that the sponsor shall provide no later than ninety (90) days prior to execution of a Standby Support Contract sufficient information for the Program Administrator to recalculate the loan costs and the incremental costs associated with the advanced nuclear facility, taking into account whether the sponsor's advanced nuclear facility is one of the initial two reactors or the subsequent four reactors.

(e) Limitations. Each Conditional Agreement shall contain a provision that limits the Department's contribution of Federal funding to the Program Account or the Grant Account to only those amounts, if any, that are appropriated to the Department in advance of the Standby Support Contract for the purpose of funding the Program Account or Grant Account. In the event the amount of appropriated funds to the Department for deposit in the Program Account or Grant Account is not sufficient to result in an amount equal to the full amount of the loan costs or incremental costs resulting from the allocation of coverage under the Conditional Agreement pursuant to 950.11(b), the sponsor shall no later than sixty (60) days prior to execution of the Standby Support Contract:

(1) Notify the Department that it shall not execute a Standby Support Contract; or

(2) Notify the Department that it shall provide the anticipated contributions to the Program Account or Grant Account as specified in the Conditional Agreement pursuant to 950.11(c)(1). The sponsor shall have the option to provide additional funds to the Program Account or Grant Account up to the amount equal to the full amount of loan costs or incremental costs. In the event the sponsor does not provide sufficient additional funds to fund the Program Account or the Grant Account in an amount equal to the full amount of loan costs or incremental costs, then the amounts of coverage available under the Standby Support Contract shall be reduced to reflect the amounts deposited in the Program Account or Grant Account. If the sponsor elects less than the full amount of coverage available under the law, then the sponsor shall not have recourse against, and the Department is not liable for, any claims for an amount of covered costs in excess of that reduced amount of coverage or the amount deposited in the Grant Account upon execution of the Standby Support Contract, notwithstanding any other provision of law.

(f) Termination of Conditional Agreements. Each Conditional Agreement shall include a provision that the Conditional Agreement remains in effect until such time as:

(1) The sponsor enters into a Standby Support Contract with the Program Administrator;

(2) The sponsor has commenced construction on an advanced nuclear facility and has not entered into a Standby Support Contract with the Program Administrator within thirty (30) days after commencement of construction;

(3) The sponsor notifies the Program Administrator in writing that it wishes to terminate the Conditional Agreement, thereby extinguishing any rights or obligations it may have under the Conditional Agreement;

(4) The Program Administrator has entered into Standby Support Contracts that cover three different reactor designs, and the Conditional Agreement is for an advanced nuclear facility of a different reactor design than those covered under existing Standby Support Contracts; or

(5) The Program Administrator has entered into six Standby Support Contracts.

§ 950.12 Standby Support Contract Conditions.

(a) Conditions Precedent. If Program Administrator has not entered into six Standby Support Contracts, the Program Administrator shall enter into a Standby Support Contract with the sponsor, consistent with applicable statutes and regulations and subject to the conditions set forth in paragraphs (b) and (c) of this section, upon a determination by the Department that all the conditions precedent to a Standby Support Contract have been fulfilled, including that the sponsor has:

(1) A Conditional Agreement with the Department, consistent with this subpart;

(2) A combined license issued by the Commission;

(3) Documentation that it possesses all Federal, State, or local permits required by law to commence construction;

(4) Documentation that it has commenced construction of the advanced nuclear facility;

(5) Documented coverage of insurance required for the project by the Commission and lenders;

(6) Paid any required fees into the Program Account and the Grant Account, as set forth in the Conditional Agreement and paragraph (b) of this section;

(7) Provided to the Program Administrator, no later than ninety (90) days prior to execution of the contract, the sponsor's detailed schedule for completing the inspections, tests, analyses and acceptance criteria in the combined license and informing the Commission that the acceptance criteria have been met; and the sponsor's proposed schedule for review of such inspections, tests, analyses and acceptance criteria by the Commission, consistent with § 950.14(a) of this part and which the Department will evaluate and approve; and

(8) Provided to the Program Administrator, no later than ninety (90) days prior to execution of the contract, a detailed systems-level construction schedule that includes a schedule identifying projected dates of construction, testing and full power operation of the advanced nuclear facility.

(9) Provided to the Program Administrator, no later than ninety (90) days prior to the execution of the contract, a detailed and up-to-date plan of financing for the project including the credit structure and all sources and uses of funds for the project, and the projected cash flows for all debt obligations of the advanced nuclear facility.

(b) Funding. No later than thirty (30) days prior to execution of the contract, and consistent with section 638(b)(2)(C), funds in amounts determined pursuant to § 950.11(e) have been made available and shall be deposited in the Program Account or the Grant Account respectively.

(c) Limitations. The Department shall not enter into a Standby Support Contract, if:

(1) Program Account. The contract provides coverage of principal or interest costs for which the loan costs exceed the amount of funds deposited in the Program Account; or

(2) Grant Account. The contract provides coverage of incremental costs that exceed the amount of funds deposited in the Grant Account.

(d) Cancellation by Abandonment. (1) If the Program Administrator cancels a Standby Support Contract for abandonment pursuant to 950.13(f)(1), the Program Administrator may re-execute a Standby Support Contract with a sponsor other than a sponsor or that sponsor's assignee with whom the Department had a cancelled contract, provided that such replacement Standby Support Contract is executed in accordance with the terms and conditions set forth in this part, and shall be deemed to be one of the subsequent four reactors under this part.

(2) Not more than two Standby Support Contracts may be re-executed in situations involving abandonment and cancellation by the Program Administrator.

Effective Date Note:At 71 FR 46325, Aug. 11, 2006, § 950.12 was revised. Paragraph (a) of this section contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.

§ 950.13 Standby Support Contract: General provisions.

(a) Purpose. Each Standby Support Contract shall include a provision setting forth an agreement between the parties in which the Department shall provide compensation for covered costs incurred by a sponsor for covered events that result in a covered delay of full power operation of an advanced nuclear facility.

(b) Covered facility. Each Standby Support Contract shall include a provision of coverage only for an advanced nuclear facility which is not a federal entity. Each Standby Support Contract shall also include a provision to specify the advanced nuclear facility to be covered, along with the reactor design, and the location of the advanced nuclear facility.

(c) Sponsor contribution. Each Standby Support Contract shall include a provision to specify the amount that a sponsor has contributed to funding each type of account.

(d) Maximum compensation. Each Standby Support Contract shall include a provision to specify that the Program Administrator shall not pay compensation under the contract:

(1) In an aggregate amount that exceeds the amount of coverage up to $500 million each for the initial two reactors or up to $250 million each for the subsequent four reactors;

(2) In an amount for principal or interest costs for which the loan costs exceed the amount deposited in the Program Account; and

(3) In an amount for incremental costs that exceed the amount deposited in the Grant Account.

(e) Term. Each Standby Support Contract shall include a provision to specify the date at which the contract commences as well as the term of the contract. The contract shall enter into force on the date it has been signed by both the sponsor and the Program Administrator. Subject to the cancellation provisions set forth in paragraph (f) of this section, the contract shall terminate when all claims have been paid up to the full amounts to be covered under the Standby Support Contract, or all disputes involving claims under the contract have been resolved in accordance with subpart D of this part.

(f) Cancellation provisions. Each Standby Support Contract shall provide for cancellation in the following circumstances:

(1) If the sponsor abandons construction, and the abandonment is not caused by a covered event or force majeure, the Program Administrator may cancel the Standby Support Contract by giving written notice thereof to the sponsor and the parties have no further rights or obligations under the contract.

(2) If the sponsor does not require continuing coverage under the contract, the sponsor may cancel the Standby Support Contract by giving written notice thereof to the Program Administrator and the parties have no further rights or obligations under the contract.

(3) For such other cause as agreed to by the parties.

(g) Termination by sponsor. Each Standby Support Contract shall include a provision that prohibits a sponsor or any related party from executing another Standby Support Contract, if the sponsor elects to terminate its original existing Standby Support Contract, unless the sponsor has cancelled or terminated construction of the reactor covered by its original existing Standby Support Contract.

(h) Assignment. Each Standby Support Contract shall include a provision on assignment of a sponsor's rights and obligations under the contract and assignment of payment of covered costs. The Program Administrator shall permit the assignment of payment of covered costs with prior written notice to the Department. The Program Administrator shall permit assignment of rights and obligations under the contract with the Department's prior approval. The sponsor may not assign its rights and obligations under the contract without the prior written approval of the Program Administrator and any attempt to do so is null and void.

(i) Claims administration. Each Standby Support Contract shall include a provision to specify a mechanism for administering claims pursuant to the procedures set forth in subpart C of this part.

(j) Dispute resolution. Consistent with the Administrative Dispute Resolution Act, each Standby Support Contract shall include a provision to specify a mechanism for resolving disputes pursuant to the procedures set forth in subpart D of this part.

(k) Re-estimation. Consistent with the Federal Credit Reform Act (FCRA) of 1990, the sponsor shall provide all needed documentation as required in § 950.12 to allow the Department to annually re-estimate the loan cost needed in the financing account as that term is used in 2 U.S.C. 661a(7) and funded by the Program Account. “The sponsor is neither responsible for any increase in loan costs, nor entitled to recoup fees for any decrease in loan costs, resulting from the re-estimation conducted pursuant to FCRA.

§ 950.14 Standby Support Contract: Covered events, exclusions, covered delay and covered cost provisions.

(a) Covered events. Subject to the exclusions set forth in paragraph (b) of this section, each Standby Support Contract shall include a provision setting forth the type of events that are covered events under the contract. The type of events shall include:

(1) The Commission's failure to review the sponsor's inspections, tests, analyses and acceptance criteria in accordance with the Commission's rules, guidance, audit procedures, or formal opinions, in the case where the Commission has in place any rules, guidance, audit procedures or formal opinions setting schedules for its review of inspections, tests, analyses, and acceptance criteria under a combined license or the sponsor's combined license;

(2) The Commission's failure to review the sponsor's inspections, tests, analyses, and acceptance criteria on the schedule for such review proposed by the sponsor, subject to the Department's review and approval of such schedule, including review of any informal guidance or opinion of the Commission that has been provided to the sponsor or the Department, in the case where the Commission has not provided any rules, guidance, audit procedures or formal Commission opinions setting schedules for review of inspections, tests, analyses and acceptance criteria under a combined license, or under the sponsor's combined license;

(3) The conduct of pre-operational Commission hearings, that are provided for in 10 CFR part 52, after issuance of the combined license; and

(4) Litigation in State, Federal, local, or tribal courts, including appeals of Commission decisions related to an application for a combined license to such courts., and excluding administrative litigation that occurs at the Commission related to the combined license.

(b) Exclusions. Each Standby Support Contract shall include a provision setting forth the exclusions from covered costs under the contract, and for which any associated delay in the attainment of full power operations is not a covered delay. The exclusions are:

(1) The failure of the sponsor to take any action required by law, regulation, or ordinance, including but not limited to the following types of events:

(i) The sponsor's failure to comply with environmental laws or regulations such as those related to pollution abatement or human health and the environment;

(ii) The sponsor's re-performance of any inspections, tests, analyses or re-demonstration that acceptance criteria have been met due to Commission non-acceptance of the sponsor's submitted results of inspections, tests, analyses, and demonstration of acceptance criteria;

(iii) Delays attributable to the sponsor's actions to redress any deficiencies in inspections, tests, analyses or acceptance criteria as a result of a Commission disapproval of fuel loading; or

(2) Events within the control of the sponsor, including but not limited to delays attributable to the following types of events:

(i) Project planning and construction problems;

(ii) Labor-management disputes;

(iii) The sponsor's failure to perform inspections, tests, analyses and to demonstrate acceptance criteria are met or failure to inform the Commission of the successful completion of inspections, tests, analyses and demonstration of meeting acceptance criteria in accordance with its schedule; or

(iv) The lack of adequate funding for construction and testing of the advanced nuclear facility.

(3) Normal business risks, including but not limited to the following types of events:

(i) Delays attributable to force majeure events such as a strike or the failure of power or other utility services supplied to the location, or natural events such as severe weather, earthquake, landslide, mudslide, volcanic eruption, other earth movement, or flood;

(ii) Government action meaning the seizure or destruction of property by order of governmental authority;

(iii) War or military action;

(iv) Acts or decisions, including the failure to act or decide, of any government body (excluding those acts or decisions or failure to act or decide by the Commission that are covered events);

(v) Supplier or subcontractor delays in performance;

(vi) Litigation, whether initiated by the sponsor or another party, that is not a covered event under paragraph (a) of this section; or

(vii) Failure to timely obtain regulatory permits or approvals that are not covered events under paragraph (a) of this section.

(c) Covered delay. Each Standby Support Contract shall include a provision for the payment of covered costs, in accordance with the procedures in subpart C of this part for the payment of covered costs, if a covered event(s) is determined to be the cause of delay in attainment of full power operation, provided that:

(1) Under Standby Support Contracts for the subsequent four reactors, covered delay may occur only after the initial 180-day period of delay, and

(2) The sponsor has used due diligence to mitigate, shorten, and end, the covered delay and associated costs covered by the Standby Support Contract.

(d) Covered costs. Each Standby Support Contract shall include a provision to specify the type of costs for which the Department shall provide payment to a sponsor for covered delay in accordance with the procedures set forth in subparts C and D of this part. The types of costs shall be limited to either or both, dependent upon the terms of the contract:

(1) The principal or interest on which the loan costs for the Program Account was calculated; and

(2) The incremental costs on which funding for the Grant Account was calculated.

(e) ITAAC Schedule. Each Standby Support Contract shall provide for adjustments to the ITAAC review schedule when the parties deem necessary, in the case where the Commission has not provided any rules, guidance, audit procedures or formal Commission opinions setting schedules for review of inspections, tests, analyses and acceptance criteria under a combined license, upon review and approval by the Department and the sponsor. Adjustments to the ITAAC review schedule must be in writing, expressly approved by the Department and the sponsor, and remain in effective for determining covered events unless and until a subsequently issued ITAAC review schedule is approved by the parties.

Subpart C Claims Administration Process

§ 950.20 General provisions.

The parties shall include provisions in the Standby Support Contract to specify the procedures and conditions set forth in this subpart for the submission of claims and the payment of covered costs under the Standby Support Contract. A sponsor is required to establish that there is a covered event, a covered delay and a covered cost; the Department is required to establish an exclusion in accordance with § 950.14(b).

§ 950.21 Notification of covered event.

(a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or testing and that may cause covered delay. The sponsor shall submit the notification to the Claims Administrator no later than thirty (30) days of the end of the covered event and contain the following information:

(1) A description and explanation of the covered event, including supporting documentation of the event;

(2) The duration of the delay in the schedule for construction, testing and full power operation, and the schedule for inspections, tests, analyses and acceptance criteria, if applicable;

(3) The sponsor's projection of the duration of covered delay;

(4) A revised schedule for construction, testing and full power operation, including the dates of system level construction or testing that had been conducted prior to the event; and

(5) A revised inspections, tests, analyses, and acceptance criteria schedule, if applicable, including the dates of Commission review of inspections, tests, analyses, and acceptance criteria that had been conducted prior to the event.

(b) An authorized representative of the sponsor shall sign the notification of a covered event, certify the notification is made in good faith and the covered event is not an exclusion as specified in § 950.14(b), and represent that the supporting information is accurate and complete to the sponsor's knowledge and belief.

§ 950.22 Covered event determination.

(a) Completeness review. Upon notification of a covered event from the sponsor, the Claims Administrator shall review the notification for completeness within thirty (30) days of receipt. If the notification is not complete, the Claims Administrator shall return the notification within thirty (30) days of receipt and specify the incomplete information for submission by the sponsor to the Claims Administrator in time for a determination by the Claims Administrator in accordance with paragraph (c) of this section.

(b) Covered Event Determination. The Claims Administrator shall review the notification and supporting information to determine whether there is agreement by the Claims Administrator with the sponsor's representation of the event as a covered event (Covered Event Determination) based on a review of the contract conditions for covered events and exclusions.

(1) If the Claims Administrator believes the event is an exclusion as set forth in § 950.14(b), the Claims Administrator shall request within 30 days of receipt of the notification of a covered event information in the sponsor's possession that is relevant to the exclusion. The sponsor shall provide the requested information to the Administrator within 20 days of receipt of the Administrator's request.

(2) The sponsor's failure to provide the requested information in a complete or timely manner constitutes a basis for the Claims Administrator to disagree with the sponsor's covered event notification as provided in paragraph (c) of this section, and to deny a claim for covered costs related to the exclusion as provided in § 950.24 of this part.

(c) Timing. The Claims Administrator shall notify the sponsor within sixty (60) days of receipt of the notification whether the Administrator agrees with the sponsor's representation, disagrees with the representation, requires further information, or is an exclusion. If the sponsor disagrees with the Covered Event Determination, the parties shall resolve the dispute in accordance with the procedures set forth in subpart D of this part.

§ 950.23 Claims process for payment of covered costs.

(a) General. No more than 120 days of when a sponsor was scheduled to attain full power operation and expects it will incur covered costs, the sponsor may make a claim upon the Department for the payment of its covered costs under the Standby Support Contract. The sponsor shall file a Certification of Covered Costs and thereafter such Supplementary Certifications of Covered Costs as may be necessary to receive payment under the Standby Support Contract for covered costs.

(b) Certification of Covered Costs. The Certification of Covered Costs shall include the following:

(1) A Claim Report, including the information specified in paragraph (c) of this section;

(2) A certification by the sponsor that:

(i) The covered costs listed on the Claim Report filed pursuant to this section are losses to be incurred by the sponsor;

(ii) The claims for the covered costs were processed in accordance with appropriate business practices and the procedures specified in this subpart; and

(iii) The sponsor has used due diligence to mitigate, shorten, and end, the covered delay and associated costs covered by the Standby Support Contract.

(c) Claim Report. For purposes of this part, a “Claim Report” is a report of information about a sponsor's underlying claims that, in the aggregate, constitute the sponsor's covered costs. The Claim Report shall include, but is not limited to:

(1) Detailed information substantiating the duration of the covered delay;

(2) Detailed information about the covered costs associated with covered delay, including as applicable:

(i) The amount of payment for principal or interest during the covered delay, including the relevant dates of payment, amounts of payment and any other information deemed relevant by the Department, and the name of the holder of the debt, if the debt obligation is held by a Federal agency; or

(ii) The underlying payment during the covered delay related to the incremental cost of purchasing power to meet contractual agreements, including any documentation deemed relevant by the Department to calculate the fair market price of power.

(d) Supplementary Certification of Covered Cost. If the total amount of the covered costs due to a sponsor under the Standby Support Contract has not been determined at the time the Certification of Covered Costs has been filed, the sponsor shall file monthly, or on a schedule otherwise determined by the Claims Administrator, Supplementary Certifications of Covered Costs updating the amount of the covered costs owed to the sponsor. Supplementary Certifications of Covered Costs shall include a Claim Report and a certification as described in this section.

(e) Supplementary information. In addition to the information required in paragraphs (b) and (c) of this section, the Claims Administrator may request such additional supporting documentation as required to ascertain the allowable covered costs sustained by a sponsor.

Effective Date Note:At 71 FR 46325, Aug. 11, 2006, § 950.23 was revised. This section contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.

§ 950.24 Claims determination for covered costs.

(a) No later than thirty (30) days from the sponsor's submission of a Certification of Covered Costs, the Claims Administrator shall issue a Claim Determination identifying those claimed costs deemed to be allowable based on an evaluation of:

(1) The duration of covered delay, taking into account contributory or concurrent delays resulting from exclusions from coverage as established by the Claims Administrator in accordance with § 950.22;

(2) The covered costs associated with covered delay, including an assessment of the sponsor's due diligence in mitigating or ending covered costs, as set forth in § 950.23;

(3) Any adjustments to the covered costs, as set forth in § 950.26; and

(4) Other information as necessary and appropriate.

(b) The Claim Determination shall state the Claims Administrator's determination that the claim shall be paid in full, paid in an adjusted amount as deemed allowable by the Claims Administrator, or rejected in full.

(c) Should the Claims Administrator conclude that the sponsor has not supplied the required information in the Certification of Covered Costs or any supporting documentation sufficient to allow reasonable verification of the duration of the covered delay or covered costs, the Claims Administrator shall so inform the sponsor and specify the nature of additional documentation requested, in time for the sponsor to supply supplemental documentation and for the Claims Administrator to issue the Claim Determination.

(d) Should the Claims Administrator find that any claimed covered costs are not allowable or otherwise should be considered excluded costs under the Standby Support Contract, the Claims Administrator shall identify such costs and state the reason(s) for that decision in writing. A determination by the Claims Administrator that an event is an exclusion or that the sponsor has not provided complete or timely information relevant to the exclusion as specified in § 950.22 shall provide a basis for the Claims Administrator to find covered costs are not allowable. If the parties cannot agree on the covered costs, they shall resolve the dispute in accordance with the requirements in subpart D of this part.

§ 950.25 Calculation of covered costs.

(a) The Claims Administrator shall calculate the allowable amount of the covered costs claimed in the Certification of Covered Costs as follows:

(1) Costs covered through Program Account. The principal or interest on any debt obligation financing the advanced nuclear facility for the duration of covered delay to the extent the debt obligation was included in the calculation of the loan cost; and

(2) Costs covered by Grant Account. The incremental costs calculated for the duration of the covered delay. In calculating the incremental cost of power, the Claims Administrator shall consider:

(i) Fair Market Price. The fair market price may be determined by the lower of the two options: The actual cost of the short-term supply contract for replacement power, purchased by the sponsor, during the period of delay, or for each day of replacement power by its day-ahead weighted average index price in $/MWh at the hub geographically nearest to the advanced nuclear facility as posted on the previous day by the Intercontinental Exchange (ICE) or an alternate electronic marketplace deemed reliable by the Department. The daily MWh assumed to be covered is no more than its nameplate capacity multiplied by 24 hours; multiplied by the capacity-weighted U.S. average capacity factor in the previous calendar year, including in the calculation any and all commercial nuclear power units that operated in the United States for any part of the previous calendar year; and multiplied by the average of the ratios of the net generation to the grid for calculating payments to the Nuclear Waste Fund to the nameplate capacity for each nuclear unit included. In addition, the Claims Administrator may consider “fair market price” from other published indices or prices at regional trading hubs and bilateral contracts for similar delivered firm power products and the costs incurred, including acquisition costs, to move the power to the contract-specified point of delivery, as well as the provisions of the covered contract regarding replacement power costs for delivery default; and

(ii) Contractual price of power. The contractual price of power shall be determined as the daily weighted average price in equivalent $/MWh under a contractual supply agreement(s) for delivery of firm power that the sponsor entered into prior to any covered event. The daily MWh assumed to be covered is no more than the advanced nuclear facility's nameplate capacity multiplied by 24 hours; multiplied by the capacity-weighted U.S. average capacity factor in the previous calendar year, including in the calculation any and all commercial nuclear power units that operated in the United States for any part of the previous calendar year; and multiplied by the average of the ratios of the net generation to the grid for calculating payments to the Nuclear Waste Fund to the nameplate capacity for each nuclear unit included.

§ 950.26 Adjustments to claim for payment of covered costs.

(a) Aggregate amount of covered costs. The sponsor's aggregate amount of covered costs shall be reduced by any amounts that are determined to be either excluded or not covered.

(b) Amount of Department share of covered costs. The Department share of covered costs shall be adjusted as follows:

(1) No excess recoveries. The share of covered costs paid by the Department to a sponsor shall not be greater than the limitations set forth in § 950.27(d).

(2) Reduction of amount payable. The share of covered costs paid by the Department shall be reduced by the appropriate amount consistent with the following:

(i) Excluded claims. The Department shall ensure that no payment shall be made for costs resulting from events that are not covered under the contract as specified in § 950.14; and

(ii) Sponsor due diligence. Each sponsor shall ensure and demonstrate that it uses due diligence to mitigate, shorten, and to end the covered delay and associated costs covered by the Standby Support Contract.

§ 950.27 Conditions for payment of covered costs.

(a) General. The Department shall pay the covered costs associated with a Standby Support Contract in accordance with the Claim Determination issued by the Claims Administrator under § 950.24 or the Final Claim Determination under § 950.34, provided that:

(1) Neither the sponsor's claim for covered costs nor any other document submitted to support the underlying claim is fraudulent, collusive, made in bad faith, dishonest or otherwise designed to circumvent the purposes of the Act and regulations;

(2) The losses submitted for payment are within the scope of coverage issued by the Department under the terms and conditions of the Standby Support Contract as specified in subpart B of this part; and

(3) The procedures specified in this subpart have been followed and all conditions for payment have been met.

(b) Adjustments to Payments. In the event of fraud or miscalculation, the Department may subsequently adjust, including an adjustment obligating the sponsor to repay any payment made under paragraph (a) of this section.

(c) Suspension of payment for covered costs. If the Department paid or is paying covered costs under paragraph (a) of this section, and subsequently makes a determination that a sponsor has failed to meet any of the requirements for payment specified in paragraph (a) of this section for a particular covered cost, the Department may suspend payment of covered costs pending investigation and audit of the sponsor's covered costs.

(d) Amount payable. The Department's share of compensation for the initial two reactors is 100 percent of the covered costs of covered delay but not more than the coverage in the contract or $500 million per contract, whichever is less; and for the subsequent four reactors, not more than 50 percent of the covered costs of the covered delay but not more than the coverage in the contract or $250 million per contract, whichever is less. The Department's share of compensation for the subsequent four reactors is further limited in that the payment is for covered costs of a covered delay that occurs after the initial 180-day period of covered delay.

§ 950.28 Payment of covered costs.

(a) General. The Department shall pay to a sponsor covered costs in accordance with this subpart and the terms of the Standby Support Contract. Payment shall be made in such installments and on such conditions as the Department determines appropriate. Any overpayments by the Department of the covered costs shall be offset from future payments to the sponsor or returned by the sponsor to the Department within forty-five (45) days. If there is a dispute, then the Department shall pay the undisputed costs and defer payment of the disputed portion upon resolution of the dispute in accordance with the procedures in subpart D of this part. If the covered costs include principal or interest owed on a loan made or guaranteed by a Federal agency, the Department shall instead pay that Federal agency the covered costs, rather than the sponsor.

(b) Timing of Payment. The sponsor may receive payment of covered costs when:

(1) The Department has approved payment of the covered cost as specified in this subpart; and

(2) The sponsor has incurred and is obligated to pay the costs for which payment is requested.

(c) Payment process. The covered costs shall be paid to the sponsor designated on the Certification of Covered Costs required by § 950.23, or to the sponsor's assignee as permitted by § 950.13(h). A sponsor that requests payment of the covered costs must receive payment through electronic funds transfer.

Subpart D Dispute Resolution Process

§ 950.30 General.

The parties, i.e., the sponsor and the Department, shall include provisions in the Standby Support Contract that specify the procedures set forth in this subpart for the resolution of disputes under a Standby Support Contract. Sections 950.31 and 950.32 address disputes involving covered events; §§ 950.33 and 950.34 address disputes involving covered costs; and §§ 950.36 and 950.37 address disputes involving other contract matters.

§ 950.31 Covered event dispute resolution.

(a) If a sponsor disagrees with the Covered Event Determination rendered in accordance with § 950.22 and cannot resolve the dispute informally with the Claims Administrator, then the disagreement is subject to resolution as follows:

(1) A sponsor shall, within thirty (30) days of receipt of the Covered Event Determination, deliver to the Claims Administrator written notice of a sponsor's rebuttal which sets forth reasons for its disagreement, including any expert opinion obtained by the sponsor.

(2) After submission of the sponsor's rebuttal to the Claims Administrator, the parties shall have fifteen (15) days during which time they must informally and in good faith participate in mediation to attempt to resolve the disagreement before instituting the process under paragraph (b) of this section. If the parties reach agreement through mediation, the agreement shall constitute a Final Determination on Covered Events.

(3) The parties shall jointly select the mediator(s). The parties shall share equally the cost of the mediation.

(b) If the parties cannot resolve the disagreement through mediation under the timeframe established under paragraph (a)(2) of this section and the sponsor elects to continue pursuing the claim, the sponsor shall within ten (10) days submit any remaining issues in controversy to the Civilian Board of Contract Appeals (Civilian Board) or its successor, for resolution by an Administrative Judge of the Civilian Board utilizing the Civilian Board's Summary Binding Decision procedure. The parties shall abide by the procedures of the Civilian Board for Summary Binding Decision. The parties agree that the decision of the Civilian Board constitutes a Final Determination on Covered Events.

§ 950.32 Final determination on covered events.

(a) If the parties reach a Final Determination on Covered Events through mediation, or Summary Binding Decision as set forth in this subpart, the Final Determination on Covered Events is a final settlement of the issue, made by the sponsor and the Program Administrator. The sponsor, and the Department, may rely on, and neither may challenge, the Final Determination on Covered Events in any future Certification of Covered Costs related to the covered event that was the subject of that Initial Determination.

(b) The parties agree that no appeal shall be taken or further review sought, and that the Final Determination on Covered Events is final, conclusive, non-appealable and may not be set aside, except for fraud.

§ 950.33 Covered costs dispute resolution.

(a) If a sponsor disagrees with the Claim Determination rendered in accordance with § 950.24 and cannot resolve the dispute informally with the Claims Administrator, then the parties agree that any dispute must be resolved as follows:

(1) A sponsor shall, within thirty (30) days of receipt of the Claim Determination, deliver to the Claims Administrator in writing notice of and reasons for its disagreement (Sponsor's Rebuttal), including any expert opinion obtained by the sponsor.

(2) After submission of the sponsor's rebuttal to the Claims Administrator, the parties have fifteen (15) days to informally and in good faith participate in mediation to resolve the disagreement before instituting the process under paragraph (b) of this section. If the parties reach agreement through mediation, the agreement shall constitute a Final Claim Determination.

(3) The parties shall jointly select the mediator(s). The parties shall share equally the cost of the mediator(s).

(b) If the parties cannot resolve the disagreement through mediation under the timeframe established under paragraph (a)(2) of this section, any remaining issues in controversy shall be submitted by the sponsor within ten (10) days to the Civilian Board or its successor, for resolution by an Administrative Judge of the Civilian Board utilizing the Board's Summary Binding Decision procedure. The parties shall abide by the procedures of the Civilian Board for Summary Binding Decision. The parties agree that the decision of the Civilian Board shall constitute a Final Claim Determination.

§ 950.34 Final claim determination.

(a) If the parties reach a Final Claim Determination through mediation, or Summary Binding Decision as set forth in this subpart, the Final Claim Determination is a final settlement of the issue, made by the sponsor and the Program Administrator.

(b) The parties agree that no appeal shall be taken or further review sought and that the Final Claim Determination is final, conclusive, non-appealable, and may not be set aside, except for fraud.

§ 950.35 Payment of final claim determination.

Once a Final Claim Determination is reached by the methods set forth in this subpart, the parties intend that such a Final Claim Determination shall constitute a final settlement of the claim and the sponsor may immediately present to the Department a Final Claim Determination for payment.

§ 950.36 Other contract matters in dispute.

(a) If the parties disagree over terms or conditions of the Standby Support Contract other than disagreements related to covered events or covered costs, then the parties shall engage in informal dispute resolution as follows:

(1) The parties shall engage in good faith efforts to resolve the dispute after written notification by one party to the other that there is a contract matter in dispute.

(2) If the parties cannot reach a resolution of the matter in disagreement within thirty (30) days of the written notification of the matter in dispute, then the parties shall have fifteen (15) days during which time they must informally and in good faith participate in mediation to attempt to resolve the disagreement before instituting the process under paragraph (b) of this section. If the parties reach agreement through mediation, the agreement shall constitute a Final Agreement on the matter in dispute.

(3) The parties shall jointly select the mediator(s). The parties shall share equally the cost of the mediation.

(b) If the parties cannot resolve the disagreement through mediation under the timeframe established in paragraph (a)(2) of this section and either party elects to continue pursuing the disagreement, that party shall within ten (10) days submit any remaining issues in controversy to the Civilian Board or its successor, for resolution by an Administrative Judge of the Civilian Board utilizing the Civilian Board's Summary Binding Decision procedure. The parties shall abide by the procedures of the Civilian Board for Summary Binding Decision. The parties shall agree that the decision of the Civilian Board constitutes a Final Decision on the matter in dispute.

§ 950.37 Final agreement or final decision.

(a) If the parties reach a Final Agreement on a contract matter in dispute through mediation, or a Final Decision on a contract matter in dispute through a Summary Binding Decision as set forth in this subpart, the Final Agreement or Final Decision is a final settlement of the contract matter in dispute, made by the sponsor and the Program Administrator.

(b) The parties agree that no appeal shall be taken or further review sought, and that the Final Agreement or Final Decision is final, conclusive, non-appealable and may not be set aside, except for fraud.

Subpart E Audit and Investigations and Other Provisions

§ 950.40 General.

The parties shall include a provision in the Standby Support Contract that specifies the procedures in this subpart for the monitoring, auditing and disclosure of information under a Standby Support Contract.

§ 950.41 Monitoring/Auditing.

The Department has the right to audit any and all costs associated with the Standby Support Contracts. Auditors who are employees of the United States government, who are designated by the Secretary of Energy or by the Comptroller General of the United States, shall have access to, and the right to examine, at the sponsor's site or elsewhere, any pertinent documents and records of a sponsor at reasonable times under reasonable circumstances. The Secretary may direct the sponsor to submit to an audit by a public accountant or equivalent acceptable to the Secretary.

§ 950.42 Disclosure.

Information received from a sponsor by the Department may be available to the public subject to the provision of 5 U.S.C. 552, 18 U.S.C. 1905 and 10 CFR part 1004; provided that:

(a) Subject to the requirements of law, information such as trade secrets, commercial and financial information that a sponsor submits to the Department in writing shall not be disclosed without prior notice to the sponsor in accordance with Department regulations concerning the public disclosure of information. Any submitter asserting that the information is privileged or confidential should appropriately identify and mark such information.

(b) Upon a showing satisfactory to the Program Administrator that any information or portion thereof obtained under this regulation would, if made public, divulge trade secrets or other proprietary information, the Department may not disclose such information.

955 PART 955 [RESERVED]

PART 960 GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY

Authority: 42 U.S.C. 2011 et seq., 42 U.S.C. 7101 et seq., 42 U.S.C. 10101 et seq.

Source: 49 FR 47752, Dec. 6, 1984, unless otherwise noted.

Subpart A General Provisions

§ 960.1 Applicability.

These guidelines were developed in accordance with the requirements of Section 112(a) of the Nuclear Waste Policy Act of 1982 for use by the Secretary of Energy in evaluating the suitability of sites. The guidelines will be used for suitability evaluations and determinations made pursuant to Section 112(b). The guidelines set forth in this part are intended to complement the requirements set forth in the Act, 10 CFR part 60, and 40 CFR part 191. The DOE recognizes NRC jurisdiction for the resolution of differences between the guidelines and 10 CFR part 60. The guidelines have received the concurrence of the NRC. The DOE contemplates revising the guidelines from time to time, as permitted by the Act, to take into account revisions made to the above regulations and to otherwise update the guidelines as necessary. The DOE will submit the revisions to the NRC and obtain its concurrence before issuance.

[49 FR 47752, Dec. 6, 1984, as amended at 66 FR 57334, Nov. 14, 2001]

§ 960.2 Definitions.

As used in this part:

Accessible environment means the atmosphere, the land surface, surface water, oceans, and the portion of the lithosphere that is outside the controlled area.

Act means the Nuclear Waste Policy Act of 1982, as amended.

Active fault means a fault along which there is recurrent movement, which is usually indicated by small, periodic displacements or seismic activity.

Affected area means either the area of socioeconomic impact or the area of environmental impact, each of which will vary in size among potential repository sites.

Affected Indian tribe means any Indian tribe (1) within whose reservation boundaries a repository for radioactive waste is proposed to be located or (2) whose federally defined possessory or usage rights to other lands outside the reservation's boundaries arising out of congressionally ratified treaties may be substantially and adversely affected by the locating of such a facility: Provided, That the Secretary of the Interior finds, upon the petition of the appropriate governmental officials of the tribe, that such effects are both substantial and adverse to the tribe.

Affected State means any State that (1) has been notified by the DOE in accordance with Section 116(a) of the Act as containing a potentially acceptable site; (2) contains a candidate site for site characterization or repository development; or (3) contains a site selected for repository development.

Application means the act of making a finding of compliance or noncompliance with the qualifying or disqualifying conditions specified in the guidelines of subparts C and D of this part.

Aquifer means a formation, a group of formations, or a part of a formation that contains sufficient saturated permeable material to yield significant quantities of water to wells and springs.

Barrier means any material or structure that prevents or substantially delays the movement of water or radionuclides.

Candidate site means an area, within a geohydrologic setting, that is recommended by the Secretary of Energy under section 112 of the Act for site characterization, approved by the President under section 112 of the Act for characterization, or undergoing site characterization under section 113 of the Act.

Closure means final backfilling of the remaining open operational areas of the underground facility and boreholes after the termination of waste emplacement, culminating in the sealing of shafts.

Confining unit means a body of impermeable or distinctly less permeable material stratigraphically adjacent to one or more aquifers.

Containment means the confinement of radioactive waste within a designated boundary.

Controlled area means a surface location, to be marked by suitable monuments, extending horizontally no more than 10 kilometers in any direction from the outer boundary of the underground facility, and the underlying subsurface, which area has been committed to use as a geologic repository and from which incompatible activities would be prohibited before and after permanent closure.

Cumulative releases of radionuclides means the total number of curies of radionuclides entering the accessible environment in any 10,000-year period, normalized on the basis of radiotoxicity in accordance with 40 CFR part 191. The peak cumulative release of radionuclides refers to the 10,000-year period during which any such release attains its maximum predicted value.

Decommissioning means the permanent removal from service of surface facilities and components neceessary for preclosure operations only, after repository closure, in accordance with regulatory requirements and environmental policies.

Determination means a decision by the Secretary that a site is suitable for site characterization for the selection of a repository, consistent with applications of the guidelines of subparts C and D of this part in accordance with the provisions set forth in subpart B of this part.

Disposal means the emplacement in a repository of high-level radioactive waste, spent nuclear fuel, or other highly radioactive material with no foreseeable intent of recovery, whether or not such emplacement permits the recovery of such waste, and the isolation of such waste from the accessible environment.

Disqualifying condition means a condition that, if present at a site, would eliminate that site from further consideration.

Disturbed zone means that portion of the controlled area, excluding shafts, whose physical or chemical properties are predicted to change as a result of underground facility construction or heat generated by the emplaced radioactive waste such that the resultant change of properties could have a significant effect on the preformance of the geologic repository.

DOE means the U.S. Department of Energy or its duly authorized representatives.

Effective porosity means the amount of interconnected pore space and fracture openings available for the transmission of fluids, expressed as the ratio of the volume of interconnected pores and openings to the volume of rock.

Engineered-barrier system means the manmade components of a disposal system designed to prevent the release of radionuclides from the underground facility or into the geohydrologic setting. Such term includes the radioactive-waste form, radioactive-waste canisters, materials placed over and around such canisters, any other components of the waste package, and barriers used to seal penetrations in and into the underground facility.

Environmental assessment means the document required by section 112(b)(1)(E) of the Nuclear Waste Policy Act of 1982.

Environmental impact statement means the document required by section 102(2)(C) of the National Environmental Policy Act of 1969. Sections 114(a) and 114(f) of the Nuclear Waste Policy Act of 1982 include certain limitations on the National Environmental Policy Act requirements as they apply to the preparation of an environmental impact statement for the development of a repository at a characterized site.

EPA means the U.S. Environmental Protection Agency or its duly authorized representatives.

Evaluation means the act of carefully examining the characteristics of a site in relation to the requirements of the qualifying or disqualifying conditions specified in the guidelines of subparts C and D. Evaluation includes the consideration of favorable and potentially adverse conditions.

Excepted means assumed to be probable or certain on the basis of existing evidence and in the absence of significant evidence to the contrary.

Expected repository performance means the manner in which the repository is predicted to function, consideration those conditions, processes, and events that are likely to prevail or may occur during the time period of interest.

Facility means any structure, system, or system component, including engineered barriers, created by the DOE to meet repository-performance or functional objectives.

Fault means a fracture or a zone of fractures along which there has been displacement of the side relative to one another parallel to the fracture or zone of fractures.

Faulting means the process of fracturing and displacement that produces a fault.

Favorable condition means a condition that, though not necessary to qualify a site, is presumed, if present, to enhance confidence that the qualifying condition of a particular guideline can be met.

Finding means a conclusion that is reached after evaluation.

Geohydrologic setting means the system of geohydrologic units that is located within a given geologic setting.

Geohydrologic system means the geohydrologic units within a geologic setting, including any recharge, discharge, interconnections between units, and any natural or man-induced processes or events that could affect ground-water flow within or among those units.

Geohydrologic unit means an aquifer, a confining unit, or a combination of aquifers and confining units comprising a framework for a reasonably distinct geohydrologic system.

Geologic repository means a system, requiring licensing by the NRC, that is intended to be used, or may be used, for the disposal of radioactive waste in excavated geologic media. A geologic repository includes (1) the geologic-repository operations area and (2) the portion of the geologic setting that provides isolation of the radioactive waste and is located within the controlled area.

Geologic-repository operations area means a radioactive-waste facility that is part of the geologic repository, including both surface and subsurface areas and facilities where waste-handling activities are conducted.

Geologic setting means the geologic, hydrologic, and geochemical systems of the region in which a geologic-repository operations area is or may be located.

Geomorphic processes means geologic processes that are responsible for the general configuration of the Earth's surface, including the development of present landforms and their relationships to underlying structures, and are responsible for the geologic changes recorded by these surface features.

Ground water means all subsurface water as distinct from surface water.

Ground-water flux means the rate of ground-water flow per unit area of porous or fractured media measured perpendicular to the direction of flow.

Ground-water sources means aquifers that have been or could be economically and technologically developed as sources of water in the foreseeable future.

Ground-water travel time means the time required for a unit volume of ground water to travel between two locations. The travel time is the length of the flow path divided by the velocity, where velocity is the average ground-water flux passing through the cross-sectional area of the geologic medium through which flow occurs, perpendicular to the flow direction, divided by the effective porosity along the flow path. If discrete segments of the flow path have different hydrologic properties, the total travel time will be the sum of the travel times for each discrete segment.

Guideline means a statement of policy or procedure that may include, when appropriate, qualifying, disqualifying, favorable, or potentially adverse conditions as specified in the “guidelines.”

Guidelines means part 960 of title 10 of the Code of Federal Regulations—General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories.

High-level radioactive waste means (1) the highly radioactive material resulting from the reprocessing of spent nuclear fuel, including liquid waste produced directly in reprocessing and any solid material derived from such liquid waste that contains fission products in sufficient concentrations and (2) other highly radioactive material that the NRC, consistent with existing law, determines by rule requires permanent isolation.

Highly populated area means any incoporated place (recognized by the decennial reports of the U.S. Bureau of the Census) of 2,500 or more persons, or any census designated place (as defined and delineated by the Bureau) of 2,500 or more persons, unless it can be demonstrated that any such place has a lower population density than the mean value for the continental United States. Counties or county equivalents, whether incorporated or not, are specifically excluded form the definition of “place” as used herein.

Host rock means the geologic medium in which the waste is emplaced, specifically the geologic materials that directly encompass and are in close proximity to the underground facility.

Hydraulic conductivity means the volume of water that will move through a medium in a unit of time under a unit hydraulic gradient through a unit area measured perpendicular to the direction of flow.

Hydraulic gradient means a change in the static pressure of ground water, expressed in terms of the height of water above a datum, per unit of distance in a given direction.

Hydrologic process means any hydrologic phenomenon that exhibits a continuous change in time, whether slow or rapid.

Hydrologic properties means those properties of a rock that govern the entrance of water and the capacity to hold, transmit, and deliver water, such as porosity, effective porosity, specific retention, permeability, and the directions of maximum and minimum permeabilities.

Igneous activity means the emplacement (intrusion) of molten rock material (magma) into material in the Earth's crust or the expulsion (extrusion) of such material onto the Earth's surface or into its atmosphere or surface water.

Isolation means inhibiting the transport of radioactive material so that the amounts and concentrations of this material entering the accessible environment will be kept within prescribed limits.

Likely means processing or displaying the qualities, characteristics, or attributes that provide a reasonable basis for confidence that what is expected indeed exists or will occur.

Lithosphere means the solid part of the Earth, including any ground water contained within it.

Member of the public means any individual who is not engaged in operations involving the management, storage, and disposal of radioactive waste. A worker so engaged is a member of the public except when on duty at the geologic-repository operations area.

Mitigation means: (1) Avoiding the impact altogether by not taking a certain action or parts of an action; (2) minimizing impacts by limiting the degree or magnitude of the action and its implementation; (3) rectifying the impact by repairing, rehabilitating, or restoring the affected environment; (4) reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; or (5) compensating for the impact by replacing or providing substitute resources or environments.

Model means a conceptual description and the associated mathematical representation of a system, subsystem, component, or condition that is used to predict changes from a baseline state as a function of internal and/or external stimuli and as a function of time and space.

NRC means the U.S. Nuclear Regulatory Commission or its duly authorized representatives.

Perched ground water means unconfined ground water separated from an underlying body of ground water by an unsaturated zone. Its water table is a perched water table. Perched ground water is held up by a perching bed whose permeability is so low that water percolating downward through it is not able to bring water in the underlying unsaturated zone above atmospheric pressure.

Performance assessment means any analysis that predicts the behavior of a system or system component under a given set of constant and/or transient conditions. Performance assessments will include estimates of the effects of uncertainties in data and modeling.

Permanent closure is synonymous with “closure.”

Postclosure means the period of time after the closure of the geologic repository.

Potentially acceptable site means any site at which, after geologic studies and field mapping but before detailed geologic data gathering, the DOE undertakes preliminary drilling and geophysical testing for the definition of site location.

Potentially adverse condition means a condition that is presumed to detract from expected system performance, but further evaluation, additional data, or the identification of compensating or mitigating factors may indicate that its effect on the expected system performance is acceptable.

Preclosure means the period of time before and during the closure of the geologic repository.

Pre-waste-emplacement means before the authorization of repository construction by the NRC.

Qualifying condition means a condition that must be satisfied for a site to be considered acceptable with respect to a specific guideline.

Quaternary Period means the second period of the Cenozoic Era, following the Tertiary, beginning 2 to 3 million years ago and extending to the present.

Radioactive waste or “waste” means high-level radioactive waste and other radioactive materials, including spent nuclear fuel, that are received for emplacement in a geologic repository.

Radioactive-waste facility means a facility subject to the licensing and related regulatory authority of the NRC pursuant to Sections 202(3) and 202(4) of the Energy Reorganization Act of 1974 (88 Stat. 1244).

Radionuclide retardation means the process or processes that cause the time required for a given radionuclide to move between two locations to be greater than the ground-water travel time, because of physical and chemical interactions between the radionuclide and the geohydrologic unit through which the radionuclide travels.

Reasonably available technology means technology which exists and has been demonstrated or for which the results of any requisite development, demonstration, or confirmatory testing efforts before application will be available within the required time period.

Repository is synonymous with “geologic repository.”

Repository closure is synonymous with “closure.”

Repository construction means all excavation and mining activities associated with the construction of shafts, shaft stations, rooms, and necessary openings in the underground facility, preparatory to radioactive-waste emplacement, as well as the construction of necessary surface facilities, but excluding site-characterization activities.

Repository operation means all of the functions at the site leading to and involving radioactive-waste emplacement in the underground facility, including receiving, transportation, handling, emplacement, and, if necessary, retrieval.

Repository support facilities means all permanent facilities constructed in support of site-characterization activities and repository construction, operation, and closure activities, including surface structures, utility lines, roads, railroads, and similar facilities, but excluding the underground facility.

Restricted area means any area access to which is controlled by the DOE for purposes of protecting individuals from exposure to radiation and radioactive materials before repository closure, but not including any areas used as residential quarters, although a separate room or rooms in a residential building may be set apart as a restricted area.

Retrieval means the act of intentionally removing radioactive waste before repository closure from the underground location at which the waste had been previously emplaced for disposal.

Saturated zone means that part of the Earth's crust beneath the water table in which all voids, large and small, are ideally filled with water under pressure greater than atmospheric.

Secretary means the Secretary of Energy.

Site means a potentially acceptable site or a candidate site, as appropriate, until such time as the controlled area has been established, at which time the site and the controlled area are the same.

Site characterization means activities, whether in the laboratory or in the field, undertaken to establish the geologic conditions and the ranges of the parameters of a candidate site relevant to the location of a repository, including borings, surface excavations, excavations of exploratory shafts, limited subsurface lateral excavations and borings, and in situ testing needed to evaluate the suitability of a candidate site for the location of a repository, but not including preliminary borings and geophysical testing needed to assess whether site characterization should be undertaken.

Siting means the collection of exploration, testing, evaluation, and decision-making activities associated with the process of site screening, site nomination, site recommendation, and site approval for characterization or repository development.

Source term means the kinds and amounts of radionuclides that make up the source of a potential release of radioactivity.

Spent nuclear fuel means fuel that has been withdrawn from a nuclear reactor following irradiation, the constituent elements of which have not been separated by reprocessing.

Surface facilities means repository support facilities within the restricted area.

Surface water means any waters on the surface of the Earth, including fresh and salt water, ice, and snow.

System means the geologic setting at the site, the waste package, and the repository, all acting together to contain and isolate the waste.

System performance means the complete behavior of a repository system in response to the conditions, processes, and events that may affect it.

Tectonic means of, or pertaining to, the forces involved in, or the resulting structures or features of, tectonics.

Tectonics means the branch of geology dealing with the broad architecture of the outer part of the Earth, that is, the regional assembling of structural or deformational features and the study of their mutual relations, origin, and historical evolution.

To the extent practicable means the degree to which an intended course of action is capable of being effected in a manner that is reasonable and feasible within a framework of constraints.

Underground facility means the underground structure and the rock required for support, including mined openings and backfill materials, but excluding shafts, boreholes, and their seals.

Unsaturated zone means the zone between the land surface and the water table. Generally, water in this zone is under less than atmospheric pressure, and some of the voids may contain air or other gases at atmospheric pressure. Beneath flooded areas or in perched water bodies, the water pressure locally may be greater than atmospheric.

Waste form means the radioactive waste materials and any encapsulating or stabilizing matrix.

Waste package means the waste form and any containers, shielding, packing, and other sorbent materials immediately surrounding an individual waste container.

Water table means that surface in a body of ground water at which the water pressure is atmospheric.

[49 FR 47752, Dec. 6, 1984, as amended at 66 FR 57334, Nov. 14, 2001]

Subpart B Implementation Guidelines

§ 960.3 Implementation guidelines.

The guidelines of this subpart establish the procedure and basis for applying the postclosure and the preclosure guidelines of subparts C and D, respectively, to evaluations of the suitability of sites. As may be appropriate during the siting process, this procedure requires consideration of a variety of geohydrologic settings and rock types, regionality, and environmental impacts and consultation with affected States, affected Indian tribes, and Federal agencies.

[49 FR 47752, Dec. 6, 1984, as amended at 66 FR 57334, Nov. 14, 2001]

§ 960.3-1 Siting provisions.

The siting provisions establish the framework for the implementation of the siting process specified in § 960.3-2. Sections 960.3-1-1 and 960.3-1-2 require that consideration be given to sites situated in different geohydrologic settings and different types of host rock, respectively. These diversity guidelines are intended to balance the process of site selection by requiring consideration of a variety of geologic conditions and media, and thereby enhance confidence in the technical suitability of sites selected for the development of repositories. As required by the Act, § 960.3-1-3 specifies consideration of a regional distribution of repositories after recommendation of a site for development of the first repository. Section 960.3-1-4 describes the evidence that is required to support siting decisions. Section 960.3-1-5 establishes the basis for site evaluations against the postclosure and the preclosure guidelines of subparts C and D during the various phases of the siting process.

§ 960.3-1-1 Diversity of geohydrologic settings.

Consideration shall be given to a variety of geohydrologic settings in which sites for the development of repositories may be located. To the extent practicable, sites recommended as candidate sites for characterization shall be located in different geohydrologic settings.

§ 960.3-1-2 Diversity of rock types.

Consideration shall be given to a variety of geologic media in which sites for the development of repositories may be located. To the extent practicable, and with due consideration of candidate sites characterized previously or approved for such characterization if the circumstances apply, sites recommended as candidate sites for characterization shall have different types of host rock.

§ 960.3-1-3 Regionality.

In making site recommendations for repository development after the site for the first repository has been recommended, the Secretary shall give due consideration to the need for, and the advantages of, a regional distribution in the siting of subsequent repositories. Such consideration shall take into account the proximity of sites to locations at which waste is generated or temporarily stored and at which other repositories have been or are being developed.

§ 960.3-1-4 Evidence for siting decisions.

The siting process involves a sequence of four decisions: The identification of potentially acceptable sites; the nomination of sites as suitable for characterization; the recommendation of sites as candidate sites for site characterization; and after the completion of site characterization and nongeologic data gathering, the recommendation of a candidate site for the development of a repository. Each of these decisions will be supported by the evidence specified below.

§ 960.3-1-4-1 Site identification as potentially acceptable.

The evidence for the identification of a potentially acceptable site shall be the types of information specified in appendix IV of this part. Such evidence will be relatively general and less detailed than that required for the nomination of a site as suitable for characterization. Because the gathering of detailed geologic data will not take place until after the recommendation of a site for characterization, the levels of information may be relatively greater for the evaluation of those guidelines in subparts C and D that pertain to surface-identifiable factors for such site. The sources of information shall include the literature in the public domain and the private sector, when available, and will be supplemented in some instances by surface investigations and conceptual engineering design studies conducted by the DOE. Geologic surface investigations may include the mapping of identifiable rock masses, fracture and joint characteristics, and fault zones. Other surface investigations will consider the aquatic and terrestrial ecology; water rights and uses; topography; potential offsite hazards; natural resource concentrations; national or State protected resources; existing transportation systems; meteorology and climatology; population densities, centers, and distributions; and general socioeconomic characteristics.

§ 960.3-1-4-2 Site nomination for characterization.

The evidence required to support the nomination of a site as suitable for characterization shall include the types of information specified in appendix IV of this part and shall be contained or referenced in the environmental assessments to be prepared in accordance with the requirements of the Act. The source of this information shall include the literature and related studies in the public domain and the private sector, when available, and various meteorological, environmental, socioeconomic, and transportation studies conducted by the DOE in the affected area; exploratory boreholes in the region of such site, including lithologic logging and hydrologic and geophysical testing of such boreholes, laboratory testing of core samples for the evaluation of geochemical and engineering rock properties, and chemical analyses of water samples from such boreholes; surface investigations, including geologic mapping and geophysical surveys, and compilations of satellite imagery data; in situ or laboratory testing of similar rock types under expected repository conditions; evaluations of natural and man-made analogs of the repository and its subsystems, such as geothermally active areas, underground excavations, and case histories of socioeconomic cycles in areas that have experienced intermittent large-scale construction and industrial activities; and extrapolations of regional data to estimate site-specific characteristics and conditions. The exact types and amounts of information to be collected within the above categories, including such details as the specific types of hydrologic tests, combinations of geophysical tests, or number of exploratory boreholes, are dependent on the site-specific needs for the application of the guidelines of subparts C and D, in accordance with the provisions of this subpart and the application requirements set forth in appendix III of this part. The evidence shall also include those technical evaluations that use the information specified above and that provide additional bases for evaluating the ability of a site to meet the qualifying conditions of the guidelines of subparts C and D. In developing the above-mentioned bases for evaluation, as may be necessary, assumptions that approximate the characteristics or conditions considered to exist at a site, or expected to exist or occur in the future, may be used. These assumptions will be realistic but conservative enough to underestimate the potential for a site to meet the qualifying condition of a guideline; that is, the use of such assumptions should not lead to an exaggeration of the ability of a site to meet the qualifying condition.

§ 960.3-1-4-3 Site recommendation for characterization.

The evidence required to support the recommendation of a site as a candidate site for characterization shall consist of the evaluations and data contained or referenced in the environmental assessment for such site, unless the Secretary certifies that such information, in the absence of additional preliminary borings or excavations, will not be adequate to satisfy applicable requirements of the Act.

§ 960.3-1-5 Basis for site evaluations.

(a) Evaluations of individual sites and comparisons between and among sites shall be based on the postclosure and preclosure guidelines specified in subparts C and D of this part, respectively. Except for screening for potentially acceptable sites as specified in § 960.3-2-1, such evaluations shall place primary significance on the postclosure guidelines and secondary significance on the preclosure guidelines, with each set of guidelines considered collectively for such purposes. Both the postclosure and the preclosure guidelines consist of a system guideline or guidelines and corresponding groups of technical guidelines.

(b) The postclosure guidelines of subpart C of this part contain eight technical guidelines in one group. The preclosure guidelines of subpart D of this part contain eleven technical guidelines separated into three groups that represent, in decreasing order of importance, preclosure radiological safety; environment, socioeconomics, and transportation; and ease and cost of siting, construction, operation, and closure.

(c) The relative significance of any technical guideline to its corresponding system guideline is site specific. Therefore, for each technical guideline, an evaluation of compliance with the qualifying condition shall be made in the context of the collection of system elements and the evidence related to that guideline, considering on balance the favorable conditions and the potentially adverse conditions identified at a site. Similarly, for each system guideline, such evaluation shall be made in the context of the group of technical guidelines and the evidence related to that system guideline.

(d) For purposes of recommending sites for development as repositories, such evidence shall include analyses of expected repository performance to assess the likelihood of demonstrating compliance with 40 CFR part 191 and 10 CFR part 60, in accordance with § 960.4-1. A site shall be disqualified at any time during the siting process if the evidence supports a finding by the DOE that a disqualifying condition exists or the qualifying condition of any system or technical guideline cannot be met.

(e) Comparisons between and among sites shall be based on the system guidelines, to the extent practicable and in accordance with the levels of relative significance specified above for the postclosure and the preclosure guidelines. Such comparisons are intended to allow comparative evaluations of sites in terms of the capabilities of the natural barriers for waste isolation and to identify innate deficiencies that could jeopardize compliance with such requirements. If the evidence for the sites is not adequate to substantiate such comparisons, then the comparisons shall be based on the groups of technical guidelines under the postclosure and the preclosure guidelines, considering the levels of relative significance appropriate to the postclosure and the preclosure guidelines and the order of importance appropriate to the subordinate groups within the preclosure guidelines. Comparative site evaluations shall place primary importance on the natural barriers of the site. In such evaluations for the postclosure guidelines of subpart C of this part, engineered barriers shall be considered only to the extent necessary to obtain realistic source terms for comparative site evaluations based on the sensitivity of the natural barriers to such realistic engineered barriers. For a better understanding of the potential effects of engineered barriers on the overall performance of the repository system, these comparative evaluations shall consider a range of levels in the performance of the engineered barriers. That range of performance levels shall vary by at least a factor of 10 above and below the engineered-barrier performance requirements set forth in 10 CFR 60.113, and the range considered shall be identical for all sites compared. The comparisons shall assume equivalent engineered barrier performance for all sites compared and shall be structured so that engineered barriers are not relied upon to compensate for deficiencies in the geologic media. Furthermore, engineered barriers shall not be used to compensate for an inadequate site; mask the innate deficiencies of a site; disguise the strengths and weaknesses of a site and the overall system; and mask differences between sites when they are compared. Releases of different radionuclides shall be combined by the methods specified in appendix A of 40 CFR part 191.

(f) The comparisons specified in paragraph (e) of this section shall consist of two comparative evaluations that predict radionuclide releases for 100,000 years after repository closure and shall be conducted as follows. First, the sites shall be compared by means of evaluations that emphasize the performance of the natural barriers at the site. Second, the sites shall be compared by means of evaluations that emphasize the performance of the total repository system. These second evaluations shall consider the expected performance of the repository system; be based on the expected performance of waste packages and waste forms, in compliance with the requirements of 10 CFR 60.113, and on the expected hydrological and geochemical conditions at each site; and take credit for the expected performance of all other engineered components of the repository system. The comparison of isolation capability shall be one of the significant considerations in the recommendation of sites for the development of repositories. The first of the two comparative evaluations specified in the paragraph (e) of this section shall take precedence unless the second comparative evaluation would lead to substantially different recommendations. In the latter case, the two comparative evaluations shall receive comparable consideration. Sites with predicted isolation capabilities that differ by less than a factor of 10, with similar uncertainties, may be assumed to provide equivalent isolation.

[66 FR 57334, Nov. 14, 2001]

§ 960.3-2 Siting process.

The siting process begins with site screening for the identification of potentially acceptable sites. This process was completed for purposes of the first repository before the enactment of the Act, and the identification of such sites was made after enactment in accordance with the provisions of section 116(a) of the Act. The screening process for the identification of potentially acceptable sites for the second and subsequent repositories shall be conducted in accordance with the requirements specified in § 960.3-2-1 of this subpart. The nomination of any site as suitable for characterization shall follow the process specified in § 960.3-2-2, and such nomination shall be accompanied by an environmental assessment as specified in section 112(b)(1)(E) of the Act. The recommendation of sites as candidate sites for characterization shall be accomplished in accordance with the requirements specified in § 960.3-2-3.

[49 FR 47752, Dec. 6, 1984, as amended at 66 FR 57335, Nov. 14, 2001]

§ 960.3-2-1 Site screening for potentially acceptable sites.

To identify potentially acceptable sites for the development of other than the first repository, the process shall begin with site-screening activities that consider large land masses that contain rock formations of suitable depth, thickness, and lateral extent and have structural, hydrologic, and tectonic features favorable for waste containment and isolation. Within those large land masses, subsequent site-screening activities shall focus on successively smaller and increasingly more suitable land units. This process shall be developed in consultation with the States that contain land units under consideration. It shall be implemented in a sequence of steps that first applies the applicable disqualifying conditions to eliminate land units on the basis of the evidence specified in § 960.3-1-4-1 and in accordance with the application requirements set forth in appendix III of this part. After the disqualifying conditions have been applied, the favorable and potentially adverse conditions, as identified for each remaining land unit, shall be evaluated. The presence of favorable conditions shall favor a given land unit, while the presence of potentially adverse conditions shall penalize that land unit. Recognizing that favorable conditions and potentially adverse conditions for different technical guidelines can exist in the same land unit, the DOE shall seek to evaluate the composite favorability of each land unit. Land units that, in the aggregrate, exhibit potentially adverse conditions shall be deferred in favor of land units that exhibit favorable conditions. The siting provisions that require diversity of geohydrologic settings and rock types and consideration of regionality, as specified in §§ 960.3-1-1, 960.3-1-2, and 960.3-1-3, respectively, may be used to discriminate between land units and to establish the range of options in site screening. To identify a site as potentially acceptable, the evidence shall support a finding that the site is not disqualified in accordance with the application requirements set forth in appendix III of this part and shall support the decision by the DOE to proceed the continued investigation of the site on the basis of the favorable and potentially adverse conditions identified to date. In continuation of the screening process after such identification and before site nomination, the DOE may defer from further consideration land units or potentially acceptable sites or portions thereof on the basis of additional information or by the application of the siting provisions for diversity of geohydrologic settings, diversity of rock types, and regionality (§§ 960.3-1-1, 960.3-1-2, and 960.3-1-3, respectively). The deferral of potentially acceptable sites will be described in the environmental assessments that accompany the nomination of at least five sites as suitable for characterization. In order to identify potentially acceptable sites for the second and subsequent repositories, the Secretary shall first identify the State within which the site is located in a decision-basis document that describes the process and the considerations that led to the identification of such site and that has been issued previously in draft for review and comment by such State. Second, when such document is final, the Secretary shall notify the Governor and the legislature of that State and the tribal council of any affected Indian tribe of the potentially acceptable site.

§ 960.3-2-2 Nomination of sites as suitable for characterization.

From the sites identified as potentially acceptable, the Secretary shall nominate at least five sites determined suitable for site characterization for the selection of each repository site. For the second repository, at least three of the sites shall not have been nominated previously. Any site nominated as suitable for characterization for the first repository, but not recommended as a candidate site for characterization, may not be nominated as suitable for characterization for the second repository. The nomination of a site as suitable for characterization shall be accompanied by an environmental assessment as specified in section 112(b)(1)(E) of the Act. Such nomination shall be based on evaluations in accordance with the guidelines of this part, and the bases and relevant details of those evaluations and of the decision processes involved therein shall be contained in the environmental assessment for the site in the manner specified in this subpart. The evidence required to support such evaluations and siting decisions is specified in § 960.3-1-4-2.

§ 960.3-2-2-1 Evaluation of all potentially acceptable sites.

First, in considering sites for nomination, each of the potentially acceptable sites shall be evaluated on the basis of the disqualifying conditions specified in the technical guidelines of subparts C and D, in accordance with the application requirements set forth in appendix III of this part. This evaluation shall support a finding by the DOE that such sites is not disqualified.

§ 960.3-2-2-2 Selection of sites within geohydrologic settings.

Second, the siting provision requiring diversity of geohydrologic settings, as specified in § 960.3-1-1, shall be applied to group all potentially acceptable sites according to their geohydrologic settings. Third, for those geohydrologic settings that contain more than one potentially acceptable site, the preferred site shall be selected on the basis of a comparative evaluation of all potentially acceptable sites in that setting. This evaluation shall consider the distinguishing characteristics displayed by the potentially acceptable sites within the setting and the related guidelines from subparts C and D. That is, the appropriate guidelines shall be selected primarily on the basis of the kinds of evidence among sites for which distinguishing characteristics can be identified. Such comparative evaluation shall be made on the basis of the qualifying conditions for those guidelines, considering, on balance, the favorable conditions and potentially adverse conditions identified at each site. Due consideration shall also be given to the siting provisions specifying the basis for site evaluations in § 960.3-1-5, to the extent practicable, and diversity of rock types in § 960.3-1-2, if the circumstances so apply. If less than five geohydrologic settings are available for consideration, the above process shall be used to select two or more preferred sites from those settings that contain more than one potentially acceptable site, as required to obtain the number of sites to be nominated as suitable for characterization. For purposes of the second and subsequent repositories, due consideration shall also be given to the siting provision for regionality as specified in § 960.3-1-3. Fourth, each preferred site within a geohydrologic setting shall be evaluated as to whether such site is suitable for the development of a repository under the qualifying condition of each guideline specified in subparts C and D that does not require site characterization as a prerequisite for the application of such guideline. The guidelines considered appropriate to this evaluation have been selected on the basis of their exclusion under the definition of site characterization as specified in § 960.2. Although the final application of these guidelines, in accordance with the provisions set forth in appendix III of this part, does not require geologic data from site-characterization activities, such application will require additional data beyond those specified in appendix IV of this part, which will be obtained concurrently with site characterization. Such guidelines include those specified in § 960.4-2-8-2 (Site Ownership and Control) of subpart C; §§ 960.5-1(a)(1) and 960.5-1(a)(2) of subpart D (preclosure system guidelines for radiological safety and environmental quality, socioeconomics, and transportation); and §§ 960.5-2-1 through 960.5-2-7 of subpart D (Population Density and Distribution, Site Ownership and Control, Meteorology, Offsite Installations and Operations, Environmental Quality, Socioeconomic Impacts, and Transportation). This evaluation shall consider on balance those favorable conditions and potentially adverse conditions identified as such at a preferred site in relation to the qualifying condition of each such guideline. For each such guideline, this evaluation shall focus on the suitability of the site for the development of a repository by considering the activities from the start of site characterization through decommissioning and shall support a finding by the DOE in accordance with the application requirements set forth in appendix III of this part. Fifth, each preferred site within a geohydrologic setting shall be evaluated as to whether such site is suitable for site characterization under the qualifying conditions of those guidelines specified in subparts C and D that require characterization (i.e., subsurface geologic, hydrologic, and geochemical data gathering). Such guidelines include those specified in § 960.4-1(a) (postclosure system guideline); §§ 960.4-2-1 through 960.4-2-8-1 of subpart C (Geohydrology, Geochemistry, Rock Characteristics, Climatic Changes, Erosion, Dissolution, Tectonics, Human Interference, and Natural Resources); § 960.5-1(a)(3) (preclosure system guideline for ease and cost of siting, construction, operation, and closure); and § 960.5-2-8 through 960.5-2-11 of subpart D (Surface Characteristics, Rock Characteristics, Hydrology, and Tectonics). This evaluation shall consider on balance the favorable conditions and potentially adverse conditions identified as such at a preferred site in relation to the qualifying condition of each such guideline. For each such guideline, this evaluation shall focus on the suitability of the site for characterization and shall support a finding by the DOE in accordance with the application requirements set forth in appendix III of this part.

§ 960.3-2-2-3 Comparative evaluation of all sites proposed for nomination.

Sixth, for those potentially acceptable sites to be proposed for nomination, as determined by the process specified in § 960.3-2-2-2, a reasonable comparative evaluation of each such site with all other such sites shall be made. For each site and for each guideline specified in subparts C and D, the DOE shall summarize the evaluations and findings specified under § 960.3-2-2-1 and under the fourth and fifth provisions of § 960.3-2-2-2. Each such summary shall allow comparisons to be made among sites on this basis of each guideline.

§ 960.3-2-2-4 The environmental assessment.

To document the process specified above, and in compliance with section 112(b)(1)(E) of the Act, an environmental assessment shall be prepared for each site proposed for nomination as suitable for characterization. Each such environmental assessment shall describe the decision process by which such site was proposed for nomination as described in the preceding six steps and shall contain or reference the evidence that supports such process according to the requirements of § 960.3-1-4-2 and appendix IV of this part. As specified in the Act, each environmental assessment shall include an evaluation of the effects of the site-characterization activities at the site on public health and safety and the environment; a discussion of alternative activities related to site characterization that may be taken to avoid such impact; and an assessment of the regional and local impacts of locating a repository at the site. The draft environmental assessment for each site proposed for nomination as suitable for characterization shall be made available by the DOE for public comment after the Secretary has notified the Governor and legislature of the State in which the site is located, and the governing body of the affected Indian tribe where such site is located, of such impending availability.

§ 960.3-2-2-5 Formal site nomination.

After the final environmental assessments have been prepared, the Secretary shall nominate at least five sites that he determines suitable for site characterization for the selection of a repository site, and, in so doing, he shall cause to have published in the Federal Register a notice specifying the sites so nominated and announcing the availability of the final environmental assessments for such sites. This determination by the Secretary shall be based on the final environmental assessments for such sites, including, in particular, consideration of the available evidence, evaluations, and the resultant findings for the guidelines of subparts C and D so specified under the fourth and fifth provisions of § 960.3-2-2-2. Before nominating a site, the Secretary shall notify the Governor and legislature of the State in which the site is located, and the governing body of the affected Indian tribe where such site is located, of such nomination and the basis for such nomination.

§ 960.3-2-3 Recommendation of sites for characterization.

After the nomination of at least five sites as suitable for site characterization for the selection of the first repository, the Secretary shall recommend in writing to the President not less than three candidate sites for such characterization. The recommendation decision shall be based on the available geophysical, geologic, geochemical, and hydrologic data; other information; associated evaluations and findings reported in the environmental assessments accompanying the nominations; and the considerations specified below, unless the Secretary certifies that such available data will not be adequate to satisfy applicable requirements of the Act in the absence of further preliminary borings or excavations. On the basis of the evidence and in accordance with the siting provision specifying the basis for site evaluations in § 960.3-1-5, the sites nominated as suitable for characterization shall be considered as to their order of preference as candidate sites for characterization. Subsequently, the siting provisions specifying diversity of geohydrologic settings, diversity of rock types, and, after the first repository, consideration of regionality in §§ 960.3-1-1, 960.3-1-2, and 960.3-1-3, respectively, shall be considered to determine a final order of preference for the characterization of such sites. Considering this order of preference together with the available siting alternatives specified in the Act, the sites recommended as candidate sites for characterization shall offer, on balance, the most advantageous combination of characteristics and conditions for the successful development of repositories at such sites. The process for the recommendation of sites as candidate sites for characterization for the selection of any subsequent repository shall be the same as that specified above for the first repository.

§ 960.3-3 Consultation.

The DOE shall provide to designated officials of the affected States and to the governing bodies of any affected Indian tribe timely and complete information regarding determinations or plans made with respect to the siting, site characterization, design, development, construction, operation, closure, decommissioning, licensing, or regulation of a repository. Written responses to written requests for information from the designated officials of affected States or affected Indian tribes will be provided within 30 days after receipt of the written requests. In performing any study of an area for the purpose of determining the suitability of such area for the development of a repository, the DOE shall consult and cooperate with the Governor and the legislature of an affected State and the governing body of an affected Indian tribe in an effort to resolve concerns regarding public health and safety, environmental impacts, socioeconomic impacts, and technical aspects of the siting process. After notifying affected States and affected Indian tribes that potentially acceptable sites have been identified, or that a site has been approved for characterization, the DOE shall seek to enter into binding written agreements with such affected States or affected Indian tribes in accordance with the requirements of the Act. The DOE shall also consult, as appropriate, with other Federal agencies.

§ 960.3-4 Environmental impacts.

Environmental impacts shall be considered by the DOE throughout the site characterization, site selection, and repository development process. The DOE shall mitigate significant adverse environmental impacts, to the extent practicable, during site characterization and repository construction, operation, closure, and decommissioning.

Subpart C Postclosure Guidelines

§ 960.4 Postclosure guidelines.

The guidelines in this subpart specify the factors to be considered in evaluating and comparing sites on the basis of expected repository performance after closure. The postclosure guidelines are separated into a system guideline and eight technical guidelines. The system guideline establishes waste containment and isolation requirements that are based on NRC and EPA regulations. These requirements must be met by the repository system, which contains natural barriers and engineered barriers. The engineered barriers will be designed to complement the natural barriers, which provide the primary means for waste isolation.

§ 960.4-1 System guideline.

(a) Qualifying Condition. The geologic setting at the site shall allow for the physical separation of radioactive waste from the accessible environment after closure in accordance with the requirements of 40 CFR part 191, subpart B, as implemented by the provisions of 10 CFR part 60. The geologic setting at the site will allow for the use of engineered barriers to ensure compliance with the requirements of 40 CFR part 191 and 10 CFR part 60 (see appendix I of this part).

§ 960.4-2 Technical guidelines.

The technical guidelines in this subpart set forth qualifying, favorable, potentially adverse, and, in five guidelines, disqualifying conditions on the characteristics, processes, and events that may influence the performance of a repository system after closure. The favorable conditions and the potentially adverse conditions under each guideline are not listed in any assumed order of importance. Potentially adverse conditions will be considered if they affect waste isolation within the controlled area even though such conditions may occur outside the controlled area. The technical guidelines that follow establish conditions that shall be considered in determining compliance with the qualifying condition of the postclosure system guideline. For each technical guideline, an evaluation of qualification or disqualification shall be made in accordance with the requirements specified in subpart B.

§ 960.4-2-1 Geohydrology.

(a) Qualifying condition. The present and expected geohydrologic setting of a site shall be compatible with waste containment and isolation. The geohydrologic setting, considering the characteristics of and the processes operating within the geologic setting, shall permit compliance with (1) the requirements specified in § 960.4-1 for radionuclide releases to the accessible environment and (2) the requirements specified in 10 CFR 60.113 for radionuclide releases from the engineered-barrier system using reasonably available technology.

(b) Favorable conditions. (1) Site conditions such that the pre-waste-emplacement ground-water travel time along any path of likely radionuclide travel from the disturbed zone to the accessible environment would be more than 10,000 years.

(2) The nature and rates of hydrologic processes operating within the geologic setting during the Quaternary Period would, if continued into the future, not affect or would favorably affect the ability of the geologic repository to isolate the waste during the next 100,000 years.

(3) Sites that have stratigraphic, structural, and hydrologic features such that the geohydrologic system can be readily characterized and modeled with reasonable certainty.

(4) For disposal in the saturated zone, at least one of the following pre-waste-emplacement conditions exists:

(i) A host rock and immediately surrounding geohydrologic units with low hydraulic conductivities.

(ii) A downward or predominantly horizontal hydraulic gradient in the host rock and in the immediately surrounding geohydrologic units.

(iii) A low hydraulic gradient in and between the host rock and the immediately surrounding geohydrologic units.

(iv) High effective porosity together with low hydraulic conductivity in rock units along paths of likely radionuclide travel between the host rock and the accessible environment.

(5) For disposal in the unsaturated zone, at least one of the following pre-waste-emplacement conditions exists:

(i) A low and nearly constant degree of saturation in the host rock and in the immediately surrounding geohydrologic units.

(ii) A water table sufficiently below the underground facility such that the fully saturated voids continuous with the water table do not encounter the host rock.

(iii) A geohydrologic unit above the host rock that would divert the downward infiltration of water beyond the limits of the emplaced waste.

(iv) A host rock that provides for free drainage.

(v) A climatic regime in which the average annual historical precipitation is a small fraction of the average annual potential evapotranspiration.

Note:

The DOE will, in accordance with the general principles set forth in § 960.1 of these regulations, revise the guidelines as necessary, to ensure consistency with the final NRC regulations on the unsaturated zone, which were published as a proposed rule on February 16, 1984, in 49 FR 5934.

(c) Potentially adverse conditions. (1) Expected changes in geohydrologic conditions—such as changes in the hydraulic gradient, the hydraulic conductivity, the effective porosity, and the ground-water flux through the host rock and the surrounding geohydrologic units—sufficient to significantly increase the transport of radionuclides to the accessible environment as compared with pre-waste-emplacement conditions.

(2) The presence of ground-water sources, suitable for crop irrigation or human consumption without treatment, along ground-water flow paths from the host rock to the accessible environment.

(3) The presence in the geologic setting of stratigraphic or structural features—such as dikes, sills, faults, shear zones, folds, dissolution effects, or brine pockets—if their presence could significantly contribute to the difficulty of characterizing or modeling the geohydrologic system.

(d) Disqualifying condition. A site shall be disqualified if the pre-waste-emplacement ground-water travel time from the disturbed zone to the accessible environment is expected to be less than 1,000 years along any pathway of likely and significant radionuclide travel.

§ 960.4-2-2 Geochemistry.

(a) Qualifying condition. The present and expected geochemical characteristics of a site shall be compatible with waste containment and isolation. Considering the likely chemical interactions among radionuclides, the host rock, and the ground water, the characteristics of and the processes operating within the geologic setting shall permit compliance with (1) the requirements specified in § 960.4-1 for radionuclide releases to the accessible environment and (2) the requirements specified in 10 CFR 60.113 for radionuclide releases from the engineered-barrier system using reasonably available technology.

(b) Favorable conditions. (1) The nature and rates of the geochemical processes operating within the geologic setting during the Quaternary Period would, if continued into the future, not affect or would favorably affect the ability of the geologic repository to isolate the waste during the next 100,000 years.

(2) Geochemical conditions that promote the precipitation, diffusion into the rock matrix, or sorption of radionuclides; inhibit the formation of particulates, colloids, inorganic complexes, or organic complexes that increase the mobility of radionuclides; or inhibit the transport of radionuclides by particulates, colloids, or complexes.

(3) Mineral assemblages that, when subjected to expected repository conditions, would remain unaltered or would alter to mineral assemblages with equal or increased capability to retard radionuclide transport.

(4) A combination of expected geochemical conditions and a volumetric flow rate of water in the host rock that would allow less than 0.001 percent per year of the total radionuclide inventory in the repository at 1,000 years to be dissolved.

(5) Any combination of geochemical and physical retardation processes that would decrease the predicted peak cumulative releases of radionuclides to the accessible environment by a factor of 10 as compared to those predicted on the basis of ground-water travel time without such retardation.

(c) Potentially adverse conditions. (1) Ground-water conditions in the host rock that could affect the solubility or the chemical reactivity of the engineered-barrier system to the extent that the expected repository performance could be compromised.

(2) Geochemical processes or conditions that could reduce the sorption of radionuclides or degrade the rock strength.

(3) Pre-waste-emplacement ground-water conditions in the host rock that are chemically oxidizing.

§ 960.4-2-3 Rock characteristics.

(a) Qualifying condition. The present and expected characteristics of the host rock and surrounding units shall be capable of accommodating the thermal, chemical, mechanical, and radiation stresses expected to be induced by repository construction, operation, and closure and by expected interactions among the waste, host rock, ground water, and engineered components. The characteristics of and the processes operating within the geologic setting shall permit compliance with (1) the requirements specified in § 960.4-1 for radionuclide releases to the accessible environment and (2) the requirements set forth in 10 CFR 60.113 for radionuclide releases from the engineered-barrier system using reasonably available technology.

(b) Favorable Conditions. (1) A host rock that is sufficiently thick and laterally extensive to allow significant flexibility in selecting the depth, configuration, and location of the underground facility to ensure isolation.

(2) A host rock with a high thermal conductivity, a low coefficient of thermal expansion, or sufficient ductility to seal fractures induced by repository construction, operation, or closure or by interactions among the waste, host rock, ground water, and engineered components.

(c) Potentially adverse conditions. (1) Rock conditions that could require engineering measures beyond reasonably available technology for the construction, operation, and closure of the repository, if such measures are necessary to ensure waste containment or isolation.

(2) Potential for such phenomena as thermally induced fractures, the hydration or dehydration of mineral components, brine migration, or other physical, chemical, or radiation-related phenomena that could be expected to affect waste containment or isolation.

(3) A combination of geologic structure, geochemical and thermal properties, and hydrologic conditions in the host rock and surrounding units such that the heat generated by the waste could significantly decrease the isolation provided by the host rock as compared with pre-waste-emplacement conditions.

§ 960.4-2-4 Climatic changes.

(a) Qualifying condition. The site shall be located where future climatic conditions will not be likely to lead to radionuclide releases greater than those allowable under the requirements specified in § 960.4-1. In predicting the likely future climatic conditions at a site, the DOE will consider the global, regional, and site climatic patterns during the Quaternary Period, considering the geomorphic evidence of the climatic conditions in the geologic setting.

(b) Favorable conditions. (1) A surface-water system such that expected climatic cycles over the next 100,000 years would not adversely affect waste isolation.

(2) A geologic setting in which climatic changes have had little effect on the hydrologic system throughout the Quaternary Period.

(c) Potentially adverse conditions. (1) Evidence that the water table could rise sufficiently over the next 10,000 years to saturate the underground facility in a previously unsaturated host rock.

(2) Evidence that climatic changes over the next 10,000 years could cause perturbations in the hydraulic gradient, the hydraulic conductivity, the effective porosity, or the ground-water flux through the host rock and the surrounding geohydrologic units, sufficient to significantly increase the transport of radionuclides to the accessible environment.

§ 960.4-2-5 Erosion.

(a) Qualifying condition. The site shall allow the underground facility to be placed at a depth such that erosional processes acting upon the surface will not be likely to lead to radionuclide releases greater than those allowable under the requirements specified in § 960.4-1. In predicting the likelihood of potentially disruptive erosional processes, the DOE will consider the climatic, tectonic, and geomorphic evidence of rates and patterns of erosion in the geologic setting during the Quaternary Period.

(b) Favorable conditions. (1) Site conditions that permit the emplacement of waste at a depth of at least 300 meters below the directly overlying ground surface.

(2) A geologic setting where the nature and rates of the erosional processes that have been operating during the Quaternary Period are predicted to have less than one chance in 10,000 over the next 10,000 years of leading to releases of radionuclides to the accessible environment.

(3) Site conditions such that waste exhumation would not be expected to occur during the first one million years after repository closure.

(c) Potentially adverse conditions. (1) A geologic setting that shows evidence of extreme erosion during the Quaternary Period.

(2) A geologic setting where the nature and rates of geomorphic processes that have been operating during the Quaternary Period could, during the first 10,000 years after closure, adversely affect the ability of the geologic repository to isolate the waste.

(d) Disqualifying condition. The site shall be disqualified if site conditions do not allow all portions of the underground facility to be situated at least 200 meters below the directly overlying ground surface.

§ 960.4-2-6 Dissolution.

(a) Qualifying condition. The site shall be located such that any subsurface rock dissolution will not be likely to lead to radionuclide releases greater than those allowable under the requirements specified in § 960.4-1. In predicting the likelihood of dissolution within the geologic setting at a site, the DOE will consider the evidence of dissolution within that setting during the Quaternary Period, including the locations and characteristics of dissolution fronts or other dissolution features, if identified.

(b) Favorable condition. No evidence that the host rock within the site was subject to significant dissolution during the Quaternary Period.

(c) Potentially adverse condition. Evidence of dissolution within the geologic setting—such as breccia pipes, dissolution cavities, significant volumetric reduction of the host rock or surrounding strata, or any structural collapse—such that a hydraulic interconnection leading to a loss of waste isolation could occur.

(d) Disqualifying condition. The site shall be disqualified if it is likely that, during the first 10,000 years after closure, active dissolution, as predicted on the basis of the geologic record, would result in a loss of waste isolation.

§ 960.4-2-7 Tectonics.

(a) Qualifying condition. The site shall be located in a geologic setting where future tectonic processes or events will not be likely to lead to radionuclide releases greater than those allowable under the requirements specified in § 960.4-1. In predicting the likelihood of potentially disruptive tectonic processes or events, the DOE will consider the structural, stratigraphic, geophysical, and seismic evidence for the nature and rates of tectonic processes and events in the geologic setting during the Quaternary Period.

(b) Favorable condition. The nature and rates of igneous activity and tectonic processes (such as uplift, subsidence, faulting, or folding), if any, operating within the geologic setting during the Quaternary Period would, if continued into the future, have less than one chance in 10,000 over the first 10,000 years after closure of leading to releases of radionuclides to the accessible environment.

(c) Potentially adverse conditions. (1) Evidence of active folding, faulting, diapirism, uplift, subsidence, or other tectonic processes or igneous activity within the geologic setting during the Quaternary Period.

(2) Historical earthquakes within the geologic setting of such magnitude and intensity that, if they recurred, could affect waste containment or isolation.

(3) Indications, based on correlations of earthquakes with tectonic processes and features, that either the frequency of occurrence or the magnitude of earthquakes within the geologic setting may increase.

(4) More-frequent occurrences of earthquakes or earthquakes of higher magnitude than are representative of the region in which the geologic setting is located.

(5) Potential for natural phenomena such as landslides, subsidence, or volcanic activity of such magnitudes that they could create large-scale surface-water impoundments that could change the regional ground-water flow system.

(6) Potential for tectonic deformations—such as uplift, subsidence, folding, or faulting—that could adversely affect the regional ground-water flow system.

(d) Disqualifying condition. A site shall be disqualified if, based on the geologic record during the Quaternary Period, the nature and rates of fault movement or other ground motion are expected to be such that a loss of waste isolation is likely to occur.

§ 960.4-2-8 Human interference.

The site shall be located such that activities by future generations at or near the site will not be likely to affect waste containment and isolation. In assessing the likelihood of such activities, the DOE will consider the estimated effectiveness of the permanent markers and records required by 10 CFR part 60, taking into account site-specific factors, as stated in §§ 960.4-2-8-1 and 960.4-2-8-2, that could compromise their continued effectiveness.

§ 960.4-2-8-1 Natural resources.

(a) Qualifying condition. This site shall be located such that—considering permanent markers and records and reasonable projections of value, scarcity, and technology—the natural resources, including ground water suitable for crop irrigation or human consumption without treatment, present at or near the site will not be likely to give rise to interference activities that would lead to radionuclide releases greater than those allowable under the requirements specified in § 960.4-1.

(b) Favorable conditions. (1) No known natural resources that have or are projected to have in the foreseeable future a value great enough to be considered a commercially extractable resource.

(2) Ground water with 10,000 parts per million or more of total dissolved solids along any path of likely radionuclide travel from the host rock to the accessible environment.

(c) Potentially adverse conditions. (1) Indications that the site contains naturally occurring materials, whether or not actually identified in such form that (i) economic extraction is potentially feasible during the foreseeable future or (ii) such materials have a greater gross value, net value, or commercial potential than the average for other areas of similar size that are representative of, and located in, the geologic setting.

(2) Evidence of subsurface mining or extraction for resources within the site if it could affect waste containment or isolation.

(3) Evidence of drilling within the site for any purpose other than repository-site evaluation to a depth sufficient to affect waste containment and isolation.

(4) Evidence of a significant concentration of any naturally occurring material that is not widely available from other sources.

(5) Potential for foreseeable human activities—such as ground-water withdrawal, extensive irrigation, subsurface injection of fluids, underground pumped storage, military activities, or the construction of large-scale surface-water impoundments—that could adversely change portions of the ground-water flow system important to waste isolation.

(d) Disqualifying conditions. A site shall be disqualified if—

(1) Previous exploration, mining, or extraction activities for resources of commercial importance at the site have created significant pathways between the projected underground facility and the accessible environment; or

(2) Ongoing or likely future activities to recover presently valuable natural mineral resources outside the controlled area would be expected to lead to an inadvertent loss of waste isolation.

§ 960.4-2-8-2 Site ownership and control.

(a) Qualifying condition. The site shall be located on land for which the DOE can obtain, in accordance with the requirements of 10 CFR part 60, ownership, surface and subsurface rights, and control of access that are required in order that potential surface and subsurface activities as the site will not be likely to lead to radionuclide releases greater than those allowable under the requirements specified in § 960.4-1.

(b) Favorable condition. Present ownership and control of land and all surface and subsurface rights by the DOE.

(c) Potentially adverse condition. Projected land-ownership conflicts that cannot be successfully resolved through voluntary purchase-sell agreements, nondisputed agency-to-agency transfers of title, or Federal condemnation proceedings.

Subpart D Preclosure Guidelines

§ 960.5 Preclosure guidelines.

The guidelines in this subpart specify the factors to be considered in evaluating and comparing sites on the basis of expected repository performance before closure. The preclosure guidelines are separated into three system guidelines and eleven technical guidelines.

§ 960.5-1 System guidelines.

(a) Qualifying conditions—(1) Preclosure radiological safety. Any projected radiological exposures of the general public and any projected releases of radioactive materials to restricted and unrestricted areas during repository operation and closure shall meet the applicable safety requirements set forth in 10 CFR part 20, 10 CFR part 60, and 40 CFR 191, subpart A (see appendix II of this part).

(2) Environment, socioeconomics, and transportation. During repository siting, construction, operation, closure, and decommissioning the public and the environment shall be adequately protected from the hazards posed by the disposal of radioactive waste.

(3) Ease and cost of siting, construction, operation, and closure. Repository siting, construction, operation, and closure shall be demonstrated to be technically feasible on the basis of reasonably available technology, and the associated costs shall be demonstrated to be reasonable relative to other available and comparable siting options.

§ 960.5-2 Technical guidelines.

The technical guidelines in this subpart set forth qualifying, favorable, potentially adverse, and, in seven guidelines, disqualifying conditions for the characteristics, processes, and events that influence the suitability of a site relative to the preclosure system guidelines. These conditions are separated into three main groups: Preclosure radiological safety; environment, socioeconomics, and transportation; and ease and cost of siting, construction, operation, and closure. The first group includes conditions on population density and distribution, site ownership and control, meteorology, and offsite installations and operations. The second group includes conditions related to environmental quality and socioeconomic impacts in areas potentially affected by a repository and to the transportation of waste to a repository site. The third group includes conditions on the surface characteristics of the site, the characteristics of the host rock and surrounding strata, hydrology, and tectonics. The individual technical guidelines within each group, as well as the favorable conditions and the potentially adverse conditions under each guideline, are not listed in any assumed order of importance. The technical guidelines that follow establish conditions that shall be considered in determining compliance with the qualifying conditions of the preclosure system guidelines. For each technical guideline, an evaluation of qualification or disqualification shall be made in accordance with the requirements specified in subpart B.

19 Preclosure Radiological Safety
§ 960.5-2-1 Population density and distribution.

(a) Qualifying condition. The site shall be located such that, during repository operation and closure, (1) the expected average radiation dose to members of the public within any highly populated area will not be likely to exceed a small fraction of the limits allowable under the requirements specified in § 960.5-1(a)(1), and (2) the expected radiation dose to any member of the public in an unrestricted area will not be likely to exceed the limit allowable under the requirements specified in § 960.5-1(a)(1).

(b) Favorable conditions. (1) A low population density in the general region of the site.

(2) Remoteness of site from highly populated areas.

(c) Potentially adverse conditions. (1) High residential, seasonal, or daytime population density within the projected site boundaries.

(2) Proximity of the site to highly populated areas, or to areas having at least 1,000 individuals in an area 1 mile by 1 mile as defined by the most recent decennial count of the U.S. census.

(d) Disqualifying conditions. A site shall be disqualified if—

(1) Any surface facility of a repository would be located in a highly populated area; or

(2) Any surface facility of a repository would be located adjacent to an area 1 mile by 1 mile having a population of not less than 1,000 individuals as enumerated by the most recent U.S. census; or

(3) The DOE could not develop an emergency preparedness program which meets the requirements specified in DOE Order 5500.3 (Reactor and Non-Reactor Facility Emergency Planning, Preparedness, and Response Program for Department of Energy Operations) and related guides or, when issued by the NRC, in 10 CFR part 60, subpart I, “Emergency Planning Criteria.”

§ 960.5-2-2 Site ownership and control.

(a) Qualifying condition. The site shall be located on land for which the DOE can obtain, in accordance with the requirements of 10 CFR 60.121, ownership, surface and subsurface rights, and control of access that are required in order that surface and subsurface activities during repository operation and closure will not be likely to lead to radionuclide releases to an unrestricted area greater than those allowable under the requirements specified in § 960.5-1(a)(1).

(b) Favorable condition. Present ownership and control of land and all surface and subsurface mineral and water rights by the DOE.

(c) Potentially adverse condition. Projected land-ownership conflicts that cannot be successfully resolved through voluntary purchase-sell agreements, nondisputed agency-to-agency transfers of title, or Federal condemnation proceedings.

§ 960.5-2-3 Meteorology.

(a) Qualifying condition. The site shall be located such that expected meteorological conditions during repository operation and closure will not be likely to lead to radionuclide releases to an unrestricted area greater than those allowable under the requirements specified in § 960.5-1(a)(1).

(b) Favorable condition. Prevailing meteorological conditions such that any radioactive releases to the atmosphere during repository operation and closure would be effectively dispersed, thereby reducing significantly the likelihood of unacceptable exposure to any member of the public in the vicinity of the repository.

(c) Potentially adverse conditions. (1) Prevailing meteorological conditions such that radioactive emissions from repository operation of closure could be preferentially transported toward localities in the vicinity of the repository with higher population densities than are the average for the region.

(2) History of extreme weather phenomena—such as hurricanes, tornadoes, severe floods, or severe and frequent winter storms—that could significantly affect repository operation or closure.

§ 960.5-2-4 Offsite installations and operations.

(a) Qualifying condition. The site shall be located such that present projected effects from nearby industrial, transportation, and military installations and operations, including atomic energy defense activities, (1) will not significantly affect repository siting, construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2), when considered together with emissions from repository operation and closure, will not be likely to lead to radionuclide releases to an unrestricted area greater than those allowable under the requirements specified in § 960.5-1(a)(1).

(b) Favorable condition. Absence of contributing radioactive releases from other nuclear installations and operations that must be considered under the requirements of 40 CFR 191, subpart A.

(c) Potentially adverse conditions. (1) The presence of nearby potentially hazardous installations or operations that could adversely affect repository operation or closure.

(2) Presence of other nuclear installations and operations, subject to the requirements of 40 CFR part 190 or 40 CFR part 191, subpart A, with actual or projected releases near the maximum value permissible under those standards.

(d) Disqualifying condition. A site shall be disqualified if atomic energy defense activities in proximity to the site are expected to conflict irreconcilably with repository siting, construction, operation, closure, or decommissioning.

20 Environment, Socioeconomics, and Transportation
§ 960.5-2-5 Environmental quality.

(a) Qualifying condition. The site shall be located such that (1) the quality of the environment in the affected area during this and future generations will be adequately protected during repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts in the affected area can be mitigated to an acceptable degree, taking into account programmatic, technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2) can be met.

(b) Favorable conditions. (1) Projected ability to meet, within time constraints, all Federal, State, and local procedural and substantive environmental requirements applicable to the site and the activities proposed to take place thereon.

(2) Potential significant adverse environmental impacts to present and future generations can be mitigated to an insignificant level through the application of reasonable measures, taking into account programmatic, technical, social, economic, and environmental factors.

(c) Potentially adverse conditions. (1) Projected major conflict with applicable Federal, State, or local environmental requirements.

(2) Projected significant adverse environmental impacts that cannot be avoided or mitigated.

(3) Proximity to, or projected significant adverse environmental impacts of the repository or its support facilities on, a component of the National Park System, the National Wildlife Refuge System, the National Wild and Scenic Rivers System, the National Wilderness Preservation System, or National Forest Land.

(4) Proximity to, and projected significant adverse environmental impacts of the repository or its support facilities on, a significant State or regional protected resource area, such as a State park, a wildlife area, or a historical area.

(5) Proximity to, and projected significant adverse environmental impacts of the repository and its support facilities on, a significant Native American resource, such as a major Indian religious site, or other sites of unique cultural interest.

(6) Presence of critical habitats for threatened or endangered species that may be compromised by the repository or its support facilities.

(d) Disqualifying conditions. Any of the following conditions shall disqualify a site:

(1) During repository siting, construction, operation, closure, or decommissioning the quality of the environment in the affected area could not be adequately protected or projected environmental impacts in the affected area could not be mitigated to an acceptable degree, taking into account programmatic, technical, social, economic, and environmental factors.

(2) Any part of the restricted area or repository support facilities would be located within the boundaries of a component of the National Park System, the National Wildlife Refuge System, the National Wilderness Preservation System, or the National Wild and Scenic Rivers System.

(3) The presence of the restricted area or the repository support facilities would conflict irreconcilably with the previously designated resource-preservation use of a component of the National Park System, the National Wildlife Refuge System, the National Wilderness Preservation System, the National Wild and Scenic Rivers System, or National Forest Lands, or any comparably significant State protected resource that was dedicated to resource preservation at the time of the enactment of the Act.

§ 960.5-2-6 Socioeconomic impacts.

(a) Qualifying condition. The site shall be located such that (1) any significant adverse social and/or economic impacts induced in communities and surrounding regions by repository siting, construction, operation, closure, and decommissioning can be offset by reasonable mitigation or compensation, as determined by a process of analysis, planning, and consultation among the DOE, affected State and local government jurisdictions, and affected Indian tribes; and (2) the requirements specified in § 960.5-1(a)(2) can be met.

(b) Favorable conditions. (1) Ability of an affected area to absorb the project-related population changes without significant disruptions of community services and without significant impacts on housing supply and demand.

(2) Availability of an adequate labor force in the affected area.

(3) Projected net increases in employment and business sales, improved community services, and increased government revenues in the affected area.

(4) No projected substantial disruption of primary sectors of the economy of the affected area.

(c) Potentially adverse conditions. (1) Potential for significant repository-related impacts on community services, housing supply and demand, and the finances of State and local government agencies in the affected area.

(2) Lack of an adequate labor force in the affected area.

(3) Need for repository-related purchase or acquisition of water rights, if such rights could have significant adverse impacts on the present or future development of the affected area.

(4) Potential for major disruptions of primary sectors of the economy of the affected area.

(d) Disqualifying condition. A site shall be disqualified if repository construction, operation, or closure would significantly degrade the quality, or significantly reduce the quantity, of water from major sources of offsite supplies presently suitable for human consumption or crop irrigation and such impacts cannot be compensated for, or mitigated by, reasonable measures.

§ 960.5-2-7 Transportation.

(a) Qualifying condition. The site shall be located such that (1) the access routes constructed from existing local highways and railroads to the site (i) will not conflict irreconcilably with the previously designated use of any resource listed in § 960.5-2-5(d) (2) and (3); (ii) can be designed and constructed using reasonably available technology; (iii) will not require transportation system components to meet performance standards more stringent than those specified in the applicable DOT and NRC regulations, nor require the development of new packaging containment technology; (iv) will allow transportation operations to be conducted without causing an unacceptable risk to the public or unacceptable environmental impacts, taking into account programmatic, technical, social, economic, and environmental factors; and (2) the requirements of § 960.5-1(a)(2) can be met.

(b) Favorable conditions. (1) Availability of access routes from local existing highways and railroads to the site which have any of the following characteristics:

(i) Such routes are relatively short and economical to construct as compared to access routes for other comparable siting options.

(ii) Federal condemnation is not required to acquire rights-of-way for the access routes.

(iii) Cuts, fills, tunnels, or bridges are not required.

(iv) Such routes are free of sharp curves or steep grades and are not likely to be affected by landslides or rock slides.

(v) Such routes bypass local cities and towns.

(2) Proximity to local highways and railroads that provide access to regional highways and railroads and are adequate to serve the repository without significant upgrading or reconstruction.

(3) Proximity to regional highways, mainline railroads, or inland waterways that provide access to the national transportation system.

(4) Availability of a regional railroad system with a minimum number of interchange points at which train crew and equipment changes would be required.

(5) Total projected life-cycle cost and risk for transportation of all wastes designated for the repository site which are significantly lower than those for comparable siting options, considering locations of present and potential sources of waste, interim storage facilities, and other repositories.

(6) Availability of regional and local carriers—truck, rail, and water—which have the capability and are willing to handle waste shipments to the repository.

(7) Absence of legal impediment with regard to compliance with Federal regulations for the transportation of waste in or through the affected State and adjoining States.

(8) Plans, procedures, and capabilities for response to radioactive waste transportation accidents in the affected State that are completed or being developed.

(9) A regional meteorological history indicating that significant transportation disruptions would not be routine seasonal occurrences.

(c) Potentially adverse conditions. (1) Access routes to existing local highways and railroads that are expensive to construct relative to comparable siting options.

(2) Terrain between the site and existing local highways and railroads such that steep grades, sharp switchbacks, rivers, lakes, landslides, rock slides, or potential sources of hazard to incoming waste shipments will be encountered along access routes to the site.

(3) Existing local highways and railroads that could require significant reconstruction or upgrading to provide adequate routes to the regional and national transportation system.

(4) Any local condition that could cause the transportation-related costs, environmental impacts, or risk to public health and safety from waste transportation operations to be significantly greater than those projected for other comparable siting options.

21 Ease and Cost of Siting, Construction, Operation, and Closure
§ 960.5-2-8 Surface characteristics.

(a) Qualifying condition. The site shall be located such that, considering the surface characteristics and conditions of the site and surrounding area, including surface-water systems and the terrain, the requirements specified in § 960.5-1(a)(3) can be met during repository siting, construction, operation, and closure.

(b) Favorable conditions. (1) Generally flat terrain.

(2) Generally well-drained terrain.

(c) Potentially adverse condition. Surface characteristics that could lead to the flooding of surface or underground facilities by the occupancy and modification of flood plains, the failure of existing or planned man-made surface-water impoundments, or the failure of engineered components of the repository.

§ 960.5-2-9 Rock characteristics.

(a) Qualifying condition. The site shall be located such that (1) the thickness and lateral extent and the characteristics and composition of the host rock will be suitable for accommodation of the underground facility; (2) repository construction, operation, and closure will not cause undue hazard to personnel; and (3) the requirements specified in § 960.5-1(a)(3) can be met.

(b) Favorable conditions. (1) A host rock that is sufficiently thick and laterally extensive to allow significant flexibility in selecting the depth, configuration, and location of the underground facility.

(2) A host rock with characteristics that would require minimal or no artificial support for underground openings to ensure safe repository construction, operation, and closure.

(c) Potentially adverse conditions. (1) A host rock that is suitable for repository construction, operation, and closure, but is so thin or laterally restricted that little flexibility is available for selecting the depth, configuration, or location of an underground facility.

(2) In situ characteristics and conditions that could require engineering measures beyond reasonably available technology in the construction of the shafts and underground facility.

(3) Geomechanical properties that could necessitate extensive maintenance of the underground openings during repository operation and closure.

(4) Potential for such phenomena as thermally induced fracturing, the hydration and dehydration of mineral components, or other physical, chemical, or radiation-related phenomena that could lead to safety hazards or difficulty in retrieval during repository operation.

(5) Existing faults, shear zones, pressurized brine pockets, dissolution effects, or other stratigraphic or structural features that could compromise the safety of repository personnel because of water inflow or construction problems.

(d) Disqualifying condition. The site shall be disqualified if the rock characteristics are such that the activities associated with repository construction, operation, or closure are predicted to cause significant risk to the health and safety of personnel, taking into account mitigating measures that use reasonably available technology.

§ 960.5-2-10 Hydrology.

(a) Qualifying condition. The site shall be located such that the geohydrologic setting of the site will (1) be compatible with the activities required for repository construction, operation, and closure; (2) not compromise the intended functions of the shaft liners and seals; and (3) permit the requirements specified in § 960.5-1(a)(3) to be met.

(b) Favorable conditions. (1) Absence of aquifers between the host rock and the land surface.

(2) Absence of surface-water systems that could potentially cause flooding of the repository.

(3) Availability of the water required for repository construction, operation, and closure.

(c) Potentially adverse condition. Ground-water conditions that could require complex engineering measures that are beyond reasonably available technology for repository construction, operation, and closure.

(d) Disqualifying condition. A site shall be disqualified if, based on expected ground-water conditions, it is likely that engineering measures that are beyond reasonably available technology will be required for exploratory-shaft construction or for repository construction, operation, or closure.

§ 960.5-2-11 Tectonics.

(a) Qualifying Conditions. The site shall be located in a geologic setting in which any projected effects of expected tectonic phenomena or igneous activity on repository construction, operation, or closure will be such that the requirements specified in § 960.5-1(a)(3) can be met.

(b) Favorable Condition. The nature and rates of faulting, if any, within the geologic setting are such that the magnitude and intensity of the associated seismicity are significantly less than those generally allowable for the construction and operation of nuclear facilities.

(c) Potentially Adverse Conditions. (1) Evidence of active faulting within the geologic setting.

(2) Historical earthquakes or past man-induced seismicity that, if either were to recur, could produce ground motion at the site in excess of reasonable design limits.

(3) Evidence, based on correlations of earthquakes with tectonic processes and features, (e.g., faults) within the geologic setting, that the magnitude of earthquakes at the site during repository construction, operation, and closure may be larger then predicted from historical seismicity.

(d) Disqualifying Condition. A site shall be disqualified if, based on the expected nature and rates of fault movement or other ground motion, it is likely that engineering measures that are beyond reasonably available technology will be required for exploratory-shaft construction or for repository construction, operation, or closure.

Appendix I to Part 960 NRC and EPA Requirements for Postclosure Repository Performance

Under proposed 40 CFR part 191, subpart B—Environmental Standards for Disposal, § 191.13, “Containment Requirements”, specifies that for 10,000 years after disposal (a) releases of radioactive materials to the accessible environment that are estimated to have more than one chance in 100 of occurring over a 10,000 year period (“reasonably foreseeable releases”) shall be projected to be less than the quantities permitted by Table 2 of that regulation's appendix; and (b) for “very unlikely releases” (i.e., those estimated to have between one chance in 100 and one chance in 10,000 of occurring over a 10,000 year period), the limits specified in Table 2 would be multiplied by 10. The basis for Table 2 is an upper limit on long term risks of 1,000 health effects over 10,000 years for a repository containing wastes generated from 100,000 metric tons of heavy metal of reactor fuel. For releases involving more than one radionuclide, the allowed release for each radionuclide is reduced to the fraction of its limit that insures that the overall limit on harm is not exceeded. Additionally, to provide confidence needed for compliance with the containment requirements specified above, § 191.14, “Assurance Requirements”, specifies the disposal of radioactive waste in accordance with seven requirements, relating to prompt disposal of waste; selection and design of disposal systems to keep releases to the accessible environment as small as reasonably achievable; engineered and natural barriers; nonreliance on active institutional controls after closure; passive controls after closure; natural resource areas; and design of disposal systems to allow future recovery of wastes.

The guidelines will be revised as necessary after the adoption of final regulations by the EPA.

The implementation of 40 CFR part 191, subpart B is required by 10 CFR 60.112. 10 CFR 60.113 establishes minimum conditions to be met for engineered components and ground-water flow; specifically: (1) Containment of radioactive waste within the waste packages will be substantially complete for a period to be determined by the NRC taking into account the factors specified in 10 CFR 60.113(b) provided that such period shall be not less than 300 years nor more than 1,000 years after permanent closure of the geologic repository; (2) the release rate of any radionuclide from the engineered barrier system following the containment period shall not exceed one part in 100,000 per year of the inventory of that radionuclide calculated to be present at 1,000 years following permanent closure, or such other fraction of the inventory as may be approved or specified by the NRC, provided that this requirement does not apply to any radionuclide which is released at a rate less than 0.1% of the calculated total release rate limit. The calculated total release rate limit shall be taken to be one part in 100,000 per year of the inventory of radioactive waste originally emplaced in the underground facility that remains after 1,000 years of radioactive decay; and (3) the geologic repository shall be located so that pre-waste-emplacement ground-water travel time along the fastest path of likely radionuclide travel from the disturbed zone to the accessible environment shall be at least 1,000 years or such other travel time as may be approved or specified by the NRC.

The guidelines will be revised as necessary to ensure consistency with 10 CFR part 60.

Appendix II to Part 960 NRC and EPA Requirements for Preclosure Repository Performance

Under proposed 40 CFR part 191, subpart A—Environmental Standards for Management and Storage, Section 191.03, “Standards for Normal Operations”, specifies: (1) That operations should be conducted so as to reduce exposure to members of the public to the extent reasonably achievable, taking into account technical, social, and economic considerations; and (2) that, except for variances permitted for unusual operations under Section 191.04 as an upper limit, normal operations shall be conducted in such a manner as to provide reasonable assurance that the combined annual dose equivalent to any member of the public due to: (i) operations covered by 40 CFR part 190, (ii) planned discharges of radioactive material to the general environment from operations covered by this subpart, and (iii) direct radiation from these operations; shall not exceed 25 millirems to the whole body, 75 millirems to the thyroid, or 25 millirems to any other organ.

The guidelines will be revised as necessary after the adoption of final regulations by the EPA.

The implementation of 40 CFR part 191, subpart A and 10 CFR part 20 is required by 10 CFR 60.111. 10 CFR 60.111 also specifies requirements for waste retrieval, if necessary, including considerations of design, backfilling, and schedule. 10 CFR part 20 establishes (a) exposure limits for operating personnel and (b) permissible concentrations of radionuclides in uncontrolled areas for air and water. The latter are generally less restrictive than 40 CFR 191, subpart A, but may be limiting under certain conditions (i.e., if used as a maximum for short durations rather than annual averages).

The guidelines will be revised as necessary to ensure consistency with 10 CFR part 60.

Appendix III to Part 960 Application of the System and Technical Guidelines During the Siting Process

1. This appendix presents a table that specifies how the guidelines of subparts C and D are to be applied at certain decision points of the siting process. The decision points, as referenced in the table, are defined as follows:

“Potentially acceptable” means the decision point at which a site is identified as potentially acceptable.

“Nomination and recommendation” means the decision point at which a site is nominated as suitable for characterization or recommended as a candidate site for characterization.

2. The findings resulting from the application of a disqualifying condition for any particular guideline at a given decision point are denoted in the table by the numeral 1 or 2. The numerals 1 and 2 signify the types of findings that are required and are defined as follows:

“1” means either of the following:

(a) The evidence does not support a finding that the site is disqualified.

or

(b) The evidence supports a finding that the site is disqualified.

“2” means either of the following:

(a) The evidence supports a finding that the site is not disqualified on the basis of that evidence and is not likely to be disqualified.

or

(b) The evidence supports a finding that the site is disqualified or is likely to be disqualified.

3. The findings resulting from the application of a qualifying condition for any particular guideline at a given decision point are denoted in the table by the numeral 3 or 4. The numerals 3 and 4 signify the types of findings that are required and are defined as follows:

“3” means either of the following:

(a) The evidence does not support a finding that the site is not likely to meet the qualifying condition.

or

(b) The evidence supports a finding that the site is not likely to meet the qualifying condition, and therefore the site is disqualified.

4. If performance assessments are used to substantiate any of the above findings, those assessments shall include estimates of the effects of uncertainties in data and modeling.

5. For both the disqualifying and qualifying conditions of any guideline, a higher finding (e.g., a “2” finding rather than “1”) shall be made if there is sufficient evidence to support such a finding.

Findings Resulting From the Application of the Qualifying and Disqualifying Conditions of the Technical Guidelines at Major Siting Decisions

Section 960 | Guideline | Condition | Siting decision

Potentially acceptable | Nomination and recommendation

4-1(a) | System | Qualifying | 3

4-2-1(a) | Geohydrology | ......do | 3

4-2-1(d) | ......do | Disqualifying | 1

4-2-2(a) | Geochemistry | Qualifying | 3

4-2-3(a) | Rock Characteristics | ......do | 3

4-2-4(a) | Climatic Changes | ......do | 3

4-2-5(a) | Erosion | ......do | 3

4-2-5(d) | ......do | Disqualifying | 1 | 1

4-2-6(a) | Dissolution | Qualifying | 3

4-2-6(d) | ......do | Disqualifying | 1 | 1

4-2-7(a) | Tectonics | Qualifying | 3

4-2-7(d) | ......do | Disqualifying | 1 | 1

4-2-8-1(a) | Natural Resources | Qualifying | 3

4-2-8-1(d)(1) | ......do | Disqualifying | 1 | 1

4-2-8-1(d)(2) | ......do | ......do | 1

4-2-8-2(a) | Site Ownership and Control | Qualifying | 3

5-1(a)(1) | System | ......do | 3

5-1(a)(2) | ......do | ......do | 3

5-1(a)(3) | ......do | ......do | 3

5-2-1(a) | Population Density and Distribution | ......do | 3

5-2-1(d)(1) | ......do | Disqualifying | 1 | 1

5-2-1(d)(2) | ......do | ......do | 1 | 1

5-2-1(d)(3) | ......do | ......do | 1

5-2-2(a) | Site Ownership and Control | Qualifying | 3

5-2-3(a) | Meteorology | ......do | 3

5-2-4(a) | Offsite Installations and Operations | ......do | 3

5-2-4(d) | ......do | Disqualifying | 1 | 1

5-2-5(a) | Environmental Quality | Qualifying | 3

5-2-5(d)(1) | ......do | Disqualifying | 1

5-2-5(d)(2) | ......do | ......do | 1 | 1

5-2-5(d)(3) | ......do | ......do | 1 | 1

5-2-6(a) | Socioeconomic Impacts | Qualifying | 3

5-2-6(d) | ......do | Disqualifying | 1

5-2-7(a) | Transportation | Qualifying | 3

5-2-8(a) | Surface Characteristics | ......do | 3

5-2-9(a) | Rock Characteristics | ......do | 3

5-2-9(d) | ......do | Disqualifying | 1

5-2-10(a) | Hydrology | Qualifying | 3

5-2-10(d) | ......do | Disqualifying | 1

5-2-11(a) | Tectonics | Qualifying | 3

5-2-11(d) | ......do | Disqualifying | 1 | 1

[49 FR 47752, Dec. 6, 1984, as amended at 66 FR 57335, Nov. 14, 2001]

Appendix IV to Part 960 Types of Information for the Nomination of Sites as Suitable for Characterization

The types of information specified below are those that the DOE expects will be included in the evidence used for evaluations and applications of the guidelines of subparts C and D at the time of nomination of a site as suitable for characterization. The types of information listed under each guideline are considered to be the most significant for the evaluation of that guideline. However, the types of information listed under any particular guideline will be used, as necessary, for the evaluation of any other guideline. As stated in § 960.3-1-4-2, the DOE will use technically conservative assumptions or extrapolations of regional data, where necessary, to supplement this information. The information specified below will be supplemented with conceptual models, as appropriate, and analyses of uncertainties in the data.

Before site-characterization studies and related nongeologic data gathering activities, the evidence is not expected to provide precise information, but, rather, to provide a reasonable basis for assessing the merits or shortcomings of the site against the guidelines of subparts C and D. Consequently, the types of information described below should be interpreted so as to accommodate differences among sites and differences in the information acquired before detailed studies.

The specific information required for the guideline applications set forth in appendix III of this part is expected to differ from site to site because of site-specific factors, both with regard to favorable and potentially adverse conditions and with regard to the sources and reliability of the information. The types of information specified in this appendix will be used except where the findings set forth in appendix III of this part can be arrived at by reasonable alternative means or the information is not required for the particular site.

Section 960.4-2-1 Geohydrology.

Description of the geohydrologic setting of the site, in context with its geologic setting, in order to estimate the pre-waste-emplacement ground-water flow conditions. The types of information to support this description should include—

• Location and estimated hydraulic properties of aquifers, confining units, and aquitards.

• Potential areas and modes of recharge and discharge for aquifers.

• Regional potentiometric surfaces of aquifers.

• Likely flow paths from the repository to locations in the expected accessible environment, as based on regional data.

• Preliminary estimates of ground-water travel times along the likely flow paths from the repository to locations in the expected accessible environment.

• Current use of principal aquifers and State or local management plans for such use.

Section 960.4-2-2 Geochemistry.

Description of the geochemical and hydrochemical conditions of the host rock, of the surrounding geohydrologic units, and along likely ground-water paths to locations in the expected accessible environment, in order to estimate the potential for the migration of radionuclides. The types of information to support this description should include—

• Petrology of the rocks.

• Mineralogy of the rocks and general characteristics of fracture fillings.

• Geochemical and mechanical stability of the minerals under expected repository conditions.

• General characteristics of the ground-water chemistry (e.g., reducing/oxidizing conditions and the principal ions that may affect the waste package or radionuclide behavior).

• Geochemical properties of minerals as related to radionuclide transport.

Section 960.4-2-3 Rock characteristics.

Description of the geologic and geomechanical characteristics of the site, in context with the geologic setting, in order to estimate the capability of the host rock and surrounding rock units to accommodate the thermal, mechanical, chemical, and radiation stresses expected to be induced by repository construction, operation, and closure and by expected interactions among the waste, host rock, ground-water, and engineered components of the repository system. The types of information to support this description should include—

• Approximate geology and stratigraphy of the site, including the depth, thickness, and lateral extent of the host rock and surrounding rock units.

• Approximate structural framework of the rock units and any major discontinuities identified from core samples.

• Approximate thermal, mechanical, and thermomechanical properties of the rocks, with consideration of the effects of time, stress, temperature, dimensional scale, and any major identified structural discontinuities.

• Estimates of the magnitude and direction of in situ stress and of temperature in the host rock and surrounding rock units.

Section 960.4-2-4 Climatic changes.

Description of the climatic conditions of the site region, in context with global and regional patterns of climatic changes during the Quaternary Period, in order to project likely future changes in climate such that potential impacts on the repository can be estimated. The types of information to support this description should include—

• Expected climatic conditions and cycles, based on extrapolation of climates during the Quaternary Period.

• Geomorphology of the site region and evidence of changes due to climatic changes.

• Estimated effects of expected climatic cycles on the surface-water and the ground-water systems.

Section 960.4-2-5 Erosion.

Description of the structure, stratigraphy, and geomorphology of the site, in context with the geologic setting, in order to estimate the depth of waste emplacement and the likelihood for erosional processes to uncover the waste in less than one million years. The types of information to support this description should include—

• Depth, thickness, and lateral extent of the host rock and the overlying rock units.

• Lithology of the stratigraphic units above the host rock.

• Nature and rates of geomorphic processes during the Quaternary Period.

Section 960.4-2-6 Dissolution.

Description of the stratigraphy, structure, hydrology, and geochemistry of the site, in context with the geologic setting, to delineate the approximate limits of subsurface rock dissolution, if any. This description should include such information as the following:

• The stratigraphy of the site, including rock units largely comprised of water-soluble minerals.

• The approximate extent and configuration of features indicative of dissolution within the geologic setting.

Section 960.4-2-7 Tectonics.

Description of the tectonic setting of the site, in context with its geologic setting, in order to project the tectonic stability of the site over the next 10,000 years and to identify tectonic features and processes that could be reasonably expected to have a potentially adverse effect on the performance of the repository. The types of information to support this description should include—

• The tectonic history and framework of the geologic setting and the site.

• Quaternary faults in the geologic setting, including their length, displacement, and any information regarding the age of latest movement.

• Active tectonic processes, such as uplift, diapirism, tilting, subsidence, faulting, and volcanism.

• Estimate of the geothermal gradient.

• Estimate of the regional in situ stress field.

• The historical seismicity of the geologic setting.

Section 960.4-2-8 Human interference.

Section 960.4-2-8-1 Natural resources.

Description of the mineral and energy resources of the site, in order to project whether past or future exploration and recovery could have a potentially adverse effect on the performance of the repository. The types of information to support this description should include—

• Known occurrences of energy and mineral resources, including ground water.

• Estimates of the present and projected value of these resources compared with resources contained in other areas of similar size in the geologic setting.

• Past and present drilling and mining operations in the vicinity of the site.

Section 960.4-2-8-2 Site ownership and control.

Description of the ownership of land for the geologic-repository operations area and the controlled area, in order to evaluate whether the DOE can obtain ownership of, and control access to, the site. The types of information to support this description should include—

• Present land ownership.

Section 960.5-2-1 Population density and distribution.

Description of the population density and distribution of the site region, in order to identify highly populated areas and the nearest 1 mile by 1 mile area having a population greater than 1,000 persons. The types of information to support this description should include—

• The most-recent U.S. census, including population composition, distribution, and density.

Section 960.5-2-2 Site ownership and control.

Description of current ownership of land, including surface and subsurface mineral and water rights, in order to evaluate whether the DOE can obtain control of land within the projected restricted area. The types of information to support this description should include—

• Present land ownership.

Section 960.5-2-3 Meteorology.

The meteorological setting, as determined from the closest recording station, in order to project meteorological conditions during repository operation and closure and their potential effects on the transport of airborne emissions. The types of information to support this description should include—

• Wind and atmospheric-dispersion characteristics.

• Precipitation characteristics.

• Extreme weather phenomena.

Section 960.5-2-4 Offsite installations and operations.

Description of offsite installations and operations in the vicinity of the site in order to estimate their projected effects on repository construction, operation, or closure. The types of information to support this description should include—

• Location and nature of nearby industrial, transportation, and military installations and operations, including atomic energy defense activities.

Section 960.5-2-5 Environmental quality.

Description of environmental conditions in order to estimate potential impacts on public health and welfare and on environmental quality. The types of information to support this description should include—

• Applicable Federal, State, and local procedural and substantive environmental requirements.

• Existing air quality and trends.

• Existing surface-water and ground-water quality and quantity.

• Existing land resources and uses.

• Existing terrestrial and aquatic vegetation and wildlife.

• Location of any identified critical habitats for threatened or endangered species.

• Existing aesthetic characteristics.

• Location of components of the National Park System, the National Wildlife Refuge System, the National Wild and Scenic Rivers System, the National Wilderness Preservation System, or National Forest Land.

• Location of significant State or regional protected resource areas, such as State parks, wildlife areas, or historical areas.

• Location of significant Native American resources such as major Indian religious sites, or other sites of unique cultural interest.

Section 960.5-2-6 Socioeconomic impacts.

Description of the socioeconomic conditions of the site, including population density and distribution, economics, community services and facilities, social conditions, and fiscal and government structure, in order to estimate the impacts that might result from site characterization and from the development of a repository at that site. The types of information to support this description should include—

• Population composition, density, and distribution.

• Economic base and economic activity, including major sectors of local economy.

• Employment distribution and trends by economic sector.

• Resource usage.

• Community services and infrastructure, including trends in use and current capacity utilization.

• Housing supply and demand.

• Life style and indicators of the quality of life.

• Existing social problems.

• Sources of, and trends in, local government expenditures and revenues.

Section 960.5-2-7 Transportation.

Description of the transportation facilities in the vicinity of the site in order to evaluate existing or required access routes or improvements. The types of information to support this description should include—

• Estimates of the overall cost and risk of transporting waste to the site.

• Description of the road and rail network between the site and the nearest Interstate highways and major rail lines; also, description of the waterway system, if any.

• Analyses of the adequacy of the existing regional transportation network to handle waste shipments; the movement of supplies for repository construction, operation, and closure; removal of nonradioactive waste from the site; and the transportation of the labor force.

• Improvements anticipated to be required in the transportation network and their feasibility, cost, and environmental impacts.

• Compatibility of the required transportation network improvements with the local and regional transportation and land-use plans.

• Analysis of weather impacts on transportation.

• Analysis of emergency response requirements and capabilities related to transportation.

Section 960.5-2-8 Surface characteristics.

Description of the surface characteristics of the site, in order to evaluate whether repository construction, operation, and closure are feasible on the basis of site characteristics that influence those activities. The types of information to support this description should include—

• Topography of the site.

• Existing and planned surface bodies of water.

• Definition of areas of landslides and other potentially unstable slopes, poorly drained material, or materials of low bearing strength or of high liquefaction potential.

Section 960.5-2-9 Rock characteristics.

Description of the geologic and geomechanical characteristics of the site, in context with the geologic setting, in order to project the capability of the host rock and the surrounding rock units to provide the space required for the underground facility and safe underground openings during repository construction, operation, and closure. The types of information to support this description should include—

• Depth, thickness, and lateral extent of the host rock.

• Stratigraphic and structural features within the host rock and adjacent rock units.

• Thermal, mechanical, and thermomechanical properties and constructibility characteristics of the rocks, with consideration of the effects of time, stress, temperature, dimensional scale, and any major identified structural discontinuities.

• Fluid inclusions and gas content in the host rock.

• Estimates of the magnitude and direction of in situ stress and of temperature in the host rock.

Section 960.5-2-10 Hydrology.

Description of the hydrology of the site, in context with its geologic setting, in order to project compatibility with repository construction, operation, and closure. The types of information to support this description should include—

• Surface-water systems, including recharge and runoff characteristics, and potential for flooding of the repository.

• Nature and location of aquifers, confining units, and aquitards.

• Potentiometric surfaces of aquifers.

• Hydraulic properties of geohydrologic units.

Section 960.5-2-11 Tectonics.

Description of the tectonic setting of the site, in context with the regional setting, in order to estimate any expected effects of tectonic activity on repository construction, operation, or closure. The types of information to support this description should include—

• Quaternary faults.

• Active tectonic processes.

• Preliminary estimates of expected ground motion caused by the maximum potential earthquake within the geologic setting.

PART 961 STANDARD CONTRACT FOR DISPOSAL OF SPENT NUCLEAR FUEL AND/OR HIGH-LEVEL RADIOACTIVE WASTE

Authority: Sec. 644, Pub. L. 95-91, 91 Stat. 599 (42 U.S.C. 7254) and sec. 302, Pub. L. 97-425, 96 Stat. 2257 (42 U.S.C. 10222).

Source: 48 FR 16599, Apr. 18, 1983, unless otherwise noted.

Subpart A General

§ 961.1 Purpose.

This part establishes the contractual terms and conditions under which the Department of Energy (DOE) will make available nuclear waste disposal services to the owners and generators of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) as provided in section 302 of the Nuclear Waste Policy Act of 1982 (Pub. L. 97-425). Under the contract set forth in § 961.11 of this part, DOE will take title to, transport, and dispose of spent nuclear fuel and/or high-level radioactive waste delivered to DOE by those owners or generators of such fuel or waste who execute the contract. In addition, the contract will specify the fees owners and generators of SNF and/or HLW will pay for these services. All receipts, proceeds, and revenues realized by DOE under the contract will be deposited in the Nuclear Waste Fund, an account established by the Act in the U.S. Treasury. This fund will pay for DOE's radioactive waste disposal activities, the full costs of which will be borne by the owners and generators under contract with DOE for disposal services.

§ 961.2 Applicability.

This part applies to the Secretary of Energy or his designee and any person who owns or generates spent nuclear fuel or high-level radioactive waste, of domestic origin, generated in a civilian nuclear power reactor. If executed in a timely manner, the contract contained in this part will commit DOE to accept title to, transport, and dispose of such spent fuel and waste. In exchange for these services, the owners or generators of such fuel or waste shall pay fees specified in the contract which are intended to recover fully the costs of the disposal services to be furnished by DOE. The contract must be signed by June 30, 1983, or by the date on which such owner or generator commences generation of, or takes title to, such spent fuel or waste, whichever occurs later.

§ 961.3 Definitions.

For purposes of this part—

Act means the Nuclear Waste Policy Act of 1982, Public Law 97-425, 96 Stat. 2201 et seq., 42 U.S.C. 10101 et seq.

Contract means the agreement set forth in § 961.11 of this part and any duly executed amendment or modification thereto.

Generator means any person who is licensed by the Nuclear Regulatory Commission to use a utilization or production facility under the authority of section 103 or 104 of the Atomic Energy Act of 1954 (42 U.S.C. 2133, 2134).

Owner means any person who has title to spent nuclear fuel or high-level radioactive waste.

Purchaser means any person, other than a Federal agency, who is licensed by the Nuclear Regulatory Commission to use a utilization or production facility under the authority of sections 103 or 104 of the Atomic Energy Act of 1954 (42 U.S.C. 2133, 2134) or who has title to spent nuclear fuel or high level radioactive waste and who has executed a contract with DOE.

Secretary means the Secretary of Energy of his designee.

Other definitions relating to the subject matter of this rule are set forth in Article II of the contract which is contained in § 961.11, Text of the contract, of this part.

§ 961.4 Deviations.

Requests for authority to deviate from this part shall be submitted in writing to the Contracting Officer, who shall forward the request for approval to the Senior Procurement Official, Headquarters. Each request for deviation shall contain the following information:

(a) A statement of the deviation desired, including identification of the specific paragraph number(s) of the contract;

(b) A description of the intended effect of the deviation;

(c) The reason why the deviation is considered necessary or would be in the best interests of the Government;

(d) The name of the owner or generator seeking the deviation and nuclear power reactor(s) affected;

(e) A statement as to whether the deviation has been requested previously and, if so, circumstances of the previous request;

(f) A statement of the period of time for which the deviation is needed; and

(g) Any pertinent background information will contribute to a full understanding of the desired deviation.

§ 961.5 Federal agencies.

Federal agencies or departments requiring DOE's disposal services for SNF and/or HLW will be accommodated by a suitable interagency agreement reflecting, as appropriate, the terms and conditions set forth in the contract in § 961.11; Provided, however, that the fees to be paid by Federal agencies will be equivalent to the fees that would be paid under the contract.

Subpart B Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste

§ 961.11 Text of the contract.

The text of the standard contract for disposal of spent nuclear fuel and/or high/level radioactive waste follows:

U.S. Department of Energy Contract No. ____ Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste

THIS CONTRACT, entered into this ______________ day of ____________ 19____, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the “Government”), represented by the UNITED STATES DEPARTMENT OF ENERGY (hereafter referred to as “DOE”) and ____________, (hereinafter referred to as the “Purchaser”), a corporation organized and existing under the laws of the State of ____________ [add as applicable: “acting on behalf of itself and ______.”].

Witnesseth that:

Whereas, the DOE has the responsibility for the disposal of spent nuclear fuel and high-level radioactive waste of domestic origin from civilian nuclear power reactors in order to protect the public health and safety, and the environment; and

Whereas, the DOE has the responsibility, following commencement of operation of a repository, to take title to the spent nuclear fuel or high-level radioactive waste involved as expeditiously as practicable upon the request of the generator or owner of such waste or spent nuclear fuel; and

Whereas, all costs associated with the preparation, transportation, and the disposal of spent nuclear fuel and high-level radioactive waste from civilian nuclear power reactors shall be borne by the owners and generators of such fuel and waste; and

Whereas, the DOE is required to collect a full cost recovery fee from owners and generators delivering to the DOE such spent nuclear fuel and/or high level radioactive waste; and

Whereas, the DOE is authorized to enter into contracts for the permanent disposal of spent nuclear fuel and/or high-level radioactive waste of domestic origin in DOE facilities; and

Whereas, the Purchaser desires to obtain disposal services from DOE; and

Whereas, DOE is obligated and willing to provide such disposal services, under the terms and conditions hereinafter set forth; and

Whereas, this contract is made and entered into under the authority of the DOE Organization Act (Pub. L. 95-91, 42 U.S.C. 7101 et seq.) and the Nuclear Waste Policy Act of 1982 (Pub. L. 97-425, 42 U.S.C. 10101 et seq.)

Now, therefore, the parties hereto do hereby agree as follows:

Article I—Definitions

As used throughout this contract, the following terms shall have the meanings set forth below:

1. The term assigned three-month period means the period that each Purchaser will be assigned by DOE, giving due consideration to the Purchaser's assignment preference, for purposes of reporting kilowatt hours generated by the Purchaser's nuclear power reactor and for establishing fees due and payable to DOE.

2. The term cask means a container for shipping spent nuclear fuel and/or high-level radioactive waste which meets all applicable regulatory requirements.

3. The term civilian nuclear power reactor means a civilian nuclear powerplant required to be licensed under sections 103 or 104(b) of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2133, 2134(b)).

4. The term Commission means the United states Nuclear Regulatory Commission.

5. The term contract means this agreement and any duly executed amendment or modification thereto.

6. The term Contracting Officer means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is a properly disignated Contracting Officer of the DOE; and the term includes, except as otherwise provided in this contract, the authorized representative of a Contracting Officer acting within the limits of his authority.

7. The term delivery means the transfer of custody, f.o.b. carrier, of spent nuclear fuel or high-level radioactive waste from Purchaser to DOE at the Purchaser's civilian nuclear power reactor or such other domestic site as may be designated by the Purchaser and approved by DOE.

8. The term disposal means the emplacement in a repository of high-level radioactive waste, spent nuclear fuel, or other highly radioactive waste with no foreseeable intent of recovery, whether or not such emplacement permits recovery of such waste.

9. The term DOE means the United States Department of Energy or any duly authorized representative thereof, including the Contracting Officer.

10. The term DOE facility means a facility operated by or on behalf of DOE for the purpose of disposing of spent nuclear fuel and/or high-level radioactive waste, or such other facility(ies) to which spent nuclear fuel and/or high-level radioactive waste may be shipped by DOE prior to its transportation to a disposal facility.

11. The term full cost recovery, means the recoupment by DOE, through Purchaser fees and any interest earned, of all direct costs, indirect costs, and all allocable overhead, consistent with generally accepted accounting principles consistently applied, of providing disposal services and conducting activities authorized by the Nuclear Waste Policy Act of 1982 (Pub. L. 97-425). As used herein, the term cost includes the application of Nuclear Waste Fund moneys for those uses expressly set forth in section 302 (d) and (e) of the said Act and all other uses specified in the Act.

12. The term high-level radioactive waste (HLW) means—

(a) the highly radioactive material resulting from the reprocessing of spent nuclear fuel, including liquid waste produced directly in reprocessing and any solid material derived from such liquid waste that contains fission products in sufficient concentrations; and

(b) other highly radioactive material that the Commission, consistent with existing law, determines by rule requires permanent isolation.

13. The term electricity (kilowatt hours) generated and sold means gross electrical output produced by a civilian nuclear power reactor measured at the output terminals of the turbine generator minus the normal onsite nuclear station service loads during the time electricity is being generated multiplied by the total energy adjustment factor. For purposes of this provision, the following definition shall apply:

a. The term Total Energy Adjustment Factor (TEAF) means the sum of individual owners' weighted energy adjustment factors.

b. The term Weighted Energy Adjustment Factor (WEAF) means the product of an owner's energy adjustment factor times the owner's share of the plant.

c. The term Owner's Energy Adjustment Factor (OEAF) means the sum of the individual owner's adjustment for sales to ultimate consumers and adjustment for sales for resale.

d. The term Owner's Share of the plant (OS) means the owner's fraction of metered electricity sales, the owner's fraction of plant ownership, or the sponsor company's fixed entitlement percentage of the plant's output. This definition includes joint owners of generating companies or participants in a generation and transmission cooperative.

e. The term Adjustment for Sales to ultimate Consumer (ASC) means the owner's fraction of sales to the ultimate consumer multiplied by the owner's sales to ultimate consumer adjustment factor.

f. The term Fraction of Sales to ultimate Consumer (FSC) means the owner's fractional quantity of electricity sold to the ultimate consumer relative to the total of electricity sales (sales to ultimate consumers plus the sales for resale).

g. The term Sales to ultimate Consumer Adjustment Factor (SCAF) means one minus the quotient of all electricity lost or otherwise not sold for each owner divided by the total electricity available for disposition to ultimate consumers. Electricity lost or otherwise not sold includes:

(1) Energy furnished without charge;

(2) Energy used by the company;

(3) Transmission losses;

(4) Distribution losses; and

(5) Other unaccounted losses as reported to the Federal Government “Annual Report of Major Electric Utilities, Licensees and Others,” Federal Energy Regulatory Commission (FERC) Form No.1; Rural Electrification Administration (REA) Forms 7 and 11 if appropriate; or the “Annual Electric Utility Report,” Energy Information Administration (EIA) Form EIA-861.

h. The term Total Electricity Available for Disposition to Ultimate Consumers means the reporting year's total of all of a utility's electricity supply which is available for disposition, expressed in kilowatt hours, and is equal to the sum of the energy sources minus the electricity sold for resale by the utility.

i. The term Adjustment for Sales for Resale (ASR) means the owner's fraction of sales for resale multiplied by the national average adjustment factor.

j. The term Fraction of Sales for Resale (FSR) means the owner's fractional quantity of electricity sold for resale by the utility relative to the total of electricity sales.

k. The term National Average Adjustment Factor (NAF) means the ratio of the national total of electricity sold to the national total of electricity available for disposition, based on the most recent 3 years of national data provided to the Federal Government, and will be set by the Contracting Officer. This term will be evaluated annually and revised in increments of .005.

l. Pumped storage losses. If the proportion of nuclear generated electricity consumed by a pumped-storage hydro facility can be measured or estimated and if the electricity losses associated with pumped storage facilities can be documented (e.g. based on routine and uniform records of district power data on contributions from different electricity sources), a prorated nuclear share shall be allowed as an offset to gross electricity generation reported on the annex A of appendix G, NWPA-830G form. Specific methodologies for calculating these offsets must be approved by the Contracting Officer in advance.

Instructions to annex A of appendix G, NWPA-830G provide the necessary information to calculate the energy adjustment factors.

14. The term metric tons uranium means that measure of weight, equivalent to 2,204.6 pounds of uranium and other fissile and fertile material that are loaded into a reactor core as fresh fuel.

15. The term Purchaser's site means the location of Purchaser's civilian nuclear power reactor or such other location as the Purchaser may designate.

16. The term quarterly Treasury rate means the current value of funds rate as specified by the Treasury Fiscal Requirements Manual, Volume 1, Part 6, section 8020.20. This rate is published quarterly in the Federal Register prior to the beginning of the affected quarter.

17. The term shipping lot means a specified quantity of spent nuclear fuel or high-level radioactive waste designated by Purchaser for delivery to DOE beginning on a specified date.

18. The term spent nuclear fuel (SNF) means fuel that has been withdrawn from a nuclear reactor following irradiation, the consistituent elements of which have not been separated by reprocessing.

19. The term spent nuclear fuel and high-level radioactive waste of domestic origin means irradiated fuel material used, and radioactive wastes resulting from such use, in nuclear power reactors located only in the United States.

20. The term year means the period which begins on October 1 and ends on September 30.

Article II—Scope

This contract applies to the delivery by Purchaser to DOE of SNF and/or HLW of domestic origin from civilian nuclear power reactors, acceptance of title by DOE to such SNF and/or HLW, subsequent transportation, and disposal of such SNF and/or HLW and, with respect to such material, establishes the fees to be paid by the Purchaser for the services to be rendered hereunder by DOE. The SNF and/or HLW shall be specified in a delivery commitment schedule as provided in Article V below. The services to be provided by DOE under this contract shall begin, after commencement of facility operations, not later than January 31, 1998 and shall continue until such time as all SNF and/or HLW from the civilian nuclear power reactors specified in appendix A, annexed hereto and made a part hereof, has been disposed of.

Article III—Term

The term of this contract shall be from the date of execution until such time as DOE has accepted, transported from the Purchaser's site(s) and disposed of all SNF and/or HLW of domestic origin from the civilian nuclear power reactor(s) specified in appendix A.

Article IV—Responsibilities of the Parties A. Purchaser's Responsibilities

1. Discharge Information.

(a) On an annual basis, commencing October 1, 1983, the Purchaser shall provide DOE with information on actual discharges to date and projected discharges for the next ten (10) years in the form and content set forth in appendix B, annexed hereto and made a part hereof. The information to be provided will include estimates and projections and will not be Purchaser's firm commitment with respect to discharges or deliveries.

(b) No later than October 1, 1983, the Purchaser shall provide DOE with specific information on:

(1) Total spent nuclear fuel inventory as of April 7, 1983;

(2) Total number of fuel assemblies removed from the particular reactor core prior to 12:00 a.m. April 7, 1983 for which there are plans for reinsertion in the core, indicating the current planned dates for reinsertion in the core. Estimates of the burned and unburned portion of each individual assembly are to be provided.

(c) In the event that the Purchaser fails to provide the annual forecast in the form and content required by DOE, DOE may, in its sole discretion, require a rescheduling of any delivery commitment schedule then in effect.

2. Preparation for Transportation.

(a) The Purchaser shall arrange for, and provide, all preparation, packaging, required inspections, and loading activities necessary for the transportation of SNF and/or HLW to the DOE facility. The Purchaser shall notify DOE of such activities sixty (60) days prior to the commencement of such activities. The preparatory activities by the Purchaser shall be made in accordance with all applicable laws and regulations relating to the Purchaser's responsibilities hereunder. DOE may designate a representative to observe the preparatory activities conducted by the Purchaser at the Purchaser's site, and the Purchaser shall afford access to such representative.

(b) Except as otherwise agreed to by DOE, the Purchaser shall advise DOE, in writing as specified in appendix F, annexed hereto and made a part hereof, as to the description of the material in each shipping lot sixty (60) days prior to scheduled DOE transportation of that shipping lot.

(c) The Purchaser shall be responsible for incidental maintenance, protection and preservation of any and all shipping casks furnished to the Purchaser by DOE for the performance of this contract. The Purchaser shall be liable for any loss of or damage to such DOE-furnished property, and for expenses incidental to such loss or damage while such casks are in the possession and control of the Purchaser except as otherwise provided for hereunder. Routine cask maintenance, such as scheduled overhauls, shall not be the responsibility of the Purchaser.

B. DOE Responsibilities

1. DOE shall accept title to all SNF and/or HLW, of domestic origin, generated by the civilian nuclear power reactor(s) specified in appendix A, provide subsequent transportation for such material to the DOE facility, and dispose of such material in accordance with the terms of this contract.

2. DOE shall arrange for, and provide, a cask(s) and all necessary transportation of the SNF and/or HLW from the Purchaser's site to the DOE facility. Such cask(s) shall be furnished sufficiently in advance to accommodate scheduled deliveries. Such cask(s) shall be suitable for use at the Purchaser's site, meet applicable regulatory requirements, and be accompanied by pertinent information including, but not limited to, the following:

(a) Written procedures for cask handling and loading, including specifications on Purchaser-furnished cannisters for containment of failed fuel;

(b) Training for Purchaser's personnel in cask handling and loading, as may be necessary;

(c) Technical information, special tools, equipment, lifting trunnions, spare parts and consumables needed to use and perform incidental maintenance on the cask(s); and

(d) Sufficient documentation on the equipment supplied by DOE.

3. DOE may fulfill any of its obligations, or take any action, under this contract either directly or through contractors.

4. DOE shall annually provide to the Purchaser pertinent information on the waste disposal program including information on cost projections, project plans and progress reports.

5. (a) Beginning on April 1, 1991, DOE shall issue an annual acceptance priority ranking for receipt of SNF and/or HLW at the DOE repository. This priority ranking shall be based on the age of SNF and/or HLW as calculated from the date of discharge of such material from the civilian nuclear power reactor. The oldest fuel or waste will have the highest priority for acceptance, except as provided in paragraphs B and D of Article V and paragraph B.3 of Article VI hereof.

(b) Beginning not later than July 1, 1987, DOE shall issue an annual capacity report for planning purposes. This report shall set forth the projected annual receiving capacity for the DOE facility(ies) and the annual acceptance ranking relating to DOE contracts for the disposal of SNF and/or HLW including, to the extent available, capacity information for ten (10) years following the projected commencement of operation of the initial DOE facility.

Article V—Delivery of SNF and/or HLW A. Description of SNF and HLW

The Purchaser shall deliver to DOE and DOE shall, as provided in this contract, accept the SNF and/or HLW which is described in accordance with Article VI.A. of this contract, for disposal thereof.

B. Delivery Commitment Schedule

1. Delivery commitment schedule(s), in the form set forth in appendix C annexed hereto and made a part hereof, for delivery of SNF and/or HLW shall be furnished to DOE by Purchaser. After DOE has issued its proposed acceptance priority ranking, as described in paragraph B.5 of Article IV hereof, beginning January 1, 1992 the Purchaser shall submit to DOE the delivery commitment schedule(s) which shall identify all SNF and/or HLW the Purchaser wishes to deliver to DOE beginning sixty-three (63) months thereafter. DOE shall approve or disapprove such schedules within three (3) months after receipt. In the event of disapproval, DOE shall advise the Purchaser in writing of the reasons for such disapproval and request a revised schedule from the Purchaser, to be submitted to DOE within thirty (30) days after receipt of DOE's notice of disapproval.

2. DOE shall approve or disapprove such revised schedule(s) within sixty (60) days after receipt. In the event of disapproval, DOE shall advise the Purchaser in writing of the reasons for such disapproval and shall submit its proposed schedule(s). If these are not acceptable to the Purchaser, the parties shall promptly seek to negotiate mutually acceptable schedule(s). Purchaser shall have the right to adjust the quantities of SNF and/or HLW plus or minus (±) twenty percent (20%), and the delivery schedule up to two (2) months, until the submission of the final delivery schedule.

C. Final Delivery Schedule

Final delivery schedule(s), in the form set forth in appendix D, annexed hereto and made a part hereof, for delivery of SNF and/or HLW covered by an approved delivery commitment schedule(s) shall be furnished to DOE by Purchaser. The Purchaser shall submit to DOE final delivery schedules not less than twelve (12) months prior to the delivery date specified therein. DOE shall approve or disapprove a final delivery schedule within forty-five (45) days after receipt. In the event of disapproval, DOE shall advise the Purchaser in writing of the reasons for such disapproval and shall request a revised schedule from the Purchaser, to be submitted to DOE within thirty (30) days after receipt of DOE's notice of disapproval. DOE shall approve or disapprove such revised schedule(s) within sixty (60) days after receipt. In the event of disapproval, DOE shall advise the Purchaser in writing of the reasons for such disapproval and shall submit its proposed schedule(s). If these are not acceptable to the Purchaser, the parties shall promptly seek to negotiate mutually acceptable schedule(s).

D. Emergency Deliveries

Emergency deliveries of SNF and/or HLW may be accepted by DOE before the date provided in the delivery commitment schedule upon prior written approval by DOE.

E. Exchanges

Purchaser shall have the right to determine which SNF and/or HLW is delivered to DOE; provided, however, that Purchaser shall comply with the requirements of this contract. Purchaser shall have the right to exchange approved delivery commitment schedules with parties to other contracts with DOE for disposal of SNF and/or HLW; provided, however, that DOE shall, in advance, have the right to approve or disapprove, in its sole discretion, any such exchanges. Not less than six (6) months prior to the delivery date specified in the Purchaser's approved delivery commitment schedule, the Purchaser shall submit to DOE an exchange request, which states the priority rankings of both the Purchaser hereunder and any other Purchaser with whom the exchange of approved delivery commitment schedules is proposed. DOE shall approve or disapprove the proposed exchange within thirty (30) days after receipt. In the event of disapproval, DOE shall advise the Purchaser in writing of the reasons for such disapproval.

Article VI—Criteria for Disposal A. General Requirements

1. Criteria.

(a) Except as otherwise provided in this contract, DOE shall accept hereunder only such SNF and/or HLW which meets the General Specifications for such fuel and waste as set forth in appendix E, annexed hereto and made a part hereof.

(b) Purchaser shall accurately classify SNF and/or HLW prior to delivery in accordance with paragraphs B and D of appendix E.

2. Procedures.

(a) Purchaser shall provide to DOE a detailed description of the SNF and/or HLW to be delivered hereunder in the form and content as set forth in appendix F, annexed hereto and made a part hereof. Purchaser shall promptly advise DOE of nay changes in said SNF and/or HLW as soon as they become known to the purchaser.

(b) DOE's obligation for disposing of SNF under this contract also extends to other than standard fuel; however, for any SNF which has been designated by the Purchaser as other than standard fuel, as that term is defined in appendix E, the Purchaser shall obtain delivery and procedure confirmation from DOE prior to delivery. DOE shall advise Purchaser within sixty (60) days after receipt of such confirmation request as to the technical feasibility of disposing of such fuel on the currently agreed to schedule and any schedule adjustment for such services.

B. Acceptance Procedures

1. Acceptance Priority Ranking.

Delivery commitment schedules for SNF and/or HLW may require the disposal or more material than the annual capacity of the DOE disposal facility (or facilities) can accommodate. The following acceptance priority ranking will be utilized:

(a) Except as may be provided for in subparagraph (b) below and Article V.D. of this contract, acceptance priority shall be based upon the age of the SNF and/or HLW as calculated from the date of discharge of such material from the civilian nuclear power reactor. DOE will first accept from Purchaser the oldest SNF and/or HLW for disposal in the DOE facility, except as otherwise provided for in paragraphs B and D of Article V.

(b) Notwithstanding the age of the SNF and/or HLW, priority may be accorded any SNF and/or HLW removed from a civilian nuclear power reactor that has reached the end of its useful life or has been shut down permanently for whatever reason.

2. Verification of SNF and/or HLW.

During cask loading and prior to acceptance by DOE for transportation to the DOE facility, the SNF and/or HLW description of the shipping lot shall be subject to verification by DOE. To the extent the SNF and/or HLW is consistent with the description submitted and approved, in accordance with appendices E and F, DOE agrees to accept such SNF and/or HLW for disposal when DOE has verified the SNF and/or HLW description, determined the material is properly loaded, packaged, marked, labeled and ready for transportation, and has taken custody, as evidenced in writing, of the material at the Purchaser's site, f.o.b. carrier. A properly executed off-site radioactive shipment record describing cask contents must be prepared by the Purchaser along with a signed certification which states: “This is to certify that the above-named materials are properly described, classified, packaged, marked and labeled and are in proper condition for transfer according to the applicable regulations of the U. S. Department of Transportation.”

3. Improperly described SNF and/or HLW.

(a) Prior to Acceptance— If SNF and/or HLW is determined by DOE to be improperly described prior to acceptance by DOE at the Purchaser's site, DOE shall promptly notify the Purchaser in writing of such determination. DOE reserves the right, in its sole discretion, to refuse to accept such SNF and/or HLW until the SNF and/or HLW has been properly described. The Purchaser shall not transfer such SNF and/or HLW to DOE unless DOE agrees to accept such SNF and/or HLW under such other arrangements as may be agreed to, in writing, by the parties.

(b) After Acceptance— If subsequent to its acceptance DOE finds that such SNF and/or HLW is improperly described, DOE shall promptly notify the Purchaser, in writing, of such finding. In the event of such notification, Purchaser shall provide DOE with a proper designation within thirty (30) days. In the event of a failure by the Purchaser to provide such proper designation, DOE may hold in abeyance any and all deliveries scheduled hereunder.

Article VII—Title

Title to all SNF and/or HLW accepted by DOE for disposal shall pass to DOE at the Purchaser's site as provided for in Article VI hereof. DOE shall be solely repsonsible for control of all material upon passage of title. DOE shall have the right to dispose as it sees fit of any SNF and/or HLW to which it has taken title. The Purchaser shall have no claim against DOE or the Government with respect to such SNF or HLW nor shall DOE or the Government be obligated to compensate the Purchaser for such material.

Article VIII—Fees and Terms of Payment A. Fees

1. Effective April 7, 1983, Purchaser shall be charged a fee in the amount of 1.0 mill per kilowatt hour (1M/kWh) electricity generated and sold.

2. For SNF, or solidified high-level radioactive waste derived from SNF, which fuel was used to generate electricity in a civilian nuclear power reactor prior to April 7, 1983, a one-time fee will be assessed by applying industry-wide average dollar per kilogram charges to four (4) distinct ranges of fuel burnup so that the integrated cost across all discharged (i.e. spent) fuel is equivalent to an industry-wide average charge of 1.0 mill per kilowatt-hour. For purposes of this contract, discharged nuclear fuel is that fuel removed from the reactor core with no plans for reinsertion. In the event that any such fuel withdrawn with plans for reinsertion is not reinserted, then the applicable fee for such fuel shall be calculated as set forth in this paragraph 2. The categories of spent nuclear fuel burnup and the fee schedule are listed below:

[In 1982 dollars]

Nuclear spent fuel burnup range | Dollars per kilogram

0 to 5,000 MWDT/MTU | $80.00

5,000 to 10,000 MWDT/MTU | 142.00

10,000 to 20,000 MWDT/MTU | 162.00

Over 20,000 MWDT/MTU | 184.00

This fee shall not be subject to adjustment, and the payment thereof by the Purchaser shall be made to DOE as specified in paragraph B of this Article VIII.

3. For in-core fuel as of April 7, 1983, that portion of the fuel burned through April 6, 1983 shall be subject to the one-time fee as calculated in accordance with the following methodology: [a] determine the total weight in kilograms of unranium loaded initially in the particular core; [b] determine the total megawatt-days (thermal) which have been generated by all of the fuel assemblies in the said core as of 12:00 A.M. April 7, 1983; [c] divide the megawatt-days (thermal) generated in the said core by the total metric tons of initially loaded uranium in that core and multiply the quotient by the conversion factor 0.0078 to obtain a value in dollars per kilogram; and [d] multiply the dollars per kilogram value by the kilograms determined in [a] above to derive the dollar charge for the one-time fee to be paid for the specified in-core fuel as of 12:00 A.M. April 7, 1983. For purposes of this contract, in-core fuel is that fuel in the reactor core as of the date specified, plus any fuel removed from the reactor with plans for reinsertion. That portion of such fuel unburned as of 12:00 A.M. April 7, 1983 shall be subject to the 1.0 mill per kilowatt-hour charge.

4. DOE will annually review the adequacy of the fees and adjust the 1M/KWH fee, if necessary, in order to assure full cost recovery by the Government. Any proposed adjustment to the said fee will be transmitted to Congress and shall be effective after a period of ninety (90) days of continuous session has elapsed following receipt of such transmittal unless either House of Congress adopts a resolution disapproving the proposed adjustment. Any adjustment to the 1M/KWH fee under paragraph A.1. of this Article VIII shall be prospective.

B. Payment

1. For electricity generated and sold by the Purchaser's civilian nuclear power reactor(s) on or after April 7, 1983, fees shall be paid quarterly by the Purchaser and must be received by DOE not later than the close of the last business day of the month following the end of each assigned 3-month period. The first payment shall be due on July 31, 1983, for the period April 7, 1983, to June 30, 1983. (Add as applicable: A one-time adjustment period payment shall be due on __________, for the period __________ to __________.) The assigned 3-month period, for purposes of payment and reporting of electricity generated and sold shall begin __________.

2. For SNF discharged prior to April 7, 1983, and for in-core burned fuel as of 12:00 A.M. April 7, 1983, the Purchaser shall, within two (2) years of contract execution, select one of the following fee payment options:

(a) Option 1— The Purchaser's financial obligation for said fuel shall be prorated evenly over forty (40) quarters and will consist of the fee plus interest on the outstanding fee balance. The interest from April 7, 1983, to date of the first payment is to be calculated based upon the 13-week Treasury bill rate, as reported on the first such issuance following April 7, 1983, and compounded quarterly thereafter by the 13-week Treasury bill rates as reported on the first such issuance of each succeeding assigned three-month period. Beginning with the first payment, interest is to be calculated on Purchaser's financial obligation plus accrued interest, at the ten-year Treasury note rate in effect on the date of the first payment. In no event shall the end of the forty (40) quarters extend beyond the first scheduled delivery date as reflected in the DOE-approved delivery commitment schedule. All payments shall be made concurrently with the assigned three month period payments. At any time prior to the end of the forty (40) quarters, Purchaser may, without penalty, make a full or partial lump sum payment at any of the assigned three month period payment dates. Subsequent quarterly payments will be appropriately reduced to reflect the reduction in the remaining balance in the fee due and payable. The remaining financial obligation, if any, will be subject to interest at the same ten-year Treasury note rate over the remainder of the ten year period.

(b) Option 2— The Purchaser's financial obligation shall be paid in the form of a single payment anytime prior to the first delivery, as reflected in the DOE approved delivery commitment schedule, and shall consist of the fee plus interest on the outstanding fee balance. Interest is to be calculated from April 7, 1983, to the date of the payment based upon the 13-week Treasury bill rate, as reported on the first such issuance following April 7, 1983, and compounded quarterly thereafter by the 13-week Treasury bill rates as reported on the first such issuance of each succeeding assigned three-month period until payment.

(c) Option 3— The Purchaser's financial obligation shall be paid prior to June 30, 1985, or prior to two (2) years after contract execution, whichever comes later, in the form of a single payment and shall consist of all outstanding fees for SNF and in-core fuel burned prior to April 7, 1983. Under this option, no interest shall be due to DOE from April 7, 1983, to the date of full payment on the outstanding fee balance.

3. Method of Payment:

(a) Payments shall be made by wire transfer, in accordance with instructions specified by DOE in appendix G, annexed hereto and made a part hereof, and must be received within the time periods specified in paragraph B.1. of this Article VIII.

(b) The Purchaser will complete a Standard Remittance Advice, as set forth in appendix G, for each assigned three month period payment, and mail it postmarked no later than the last business day of the month following each assigned three month period to Department of Energy, Office of Controller, Cash Management Division, Box 500, Room D-208, Germantown, Maryland 20874.

4. Any fees not paid on a timely basis or underpaid because of miscalculation will be subject to interest as specified in paragraph C of this Article VIII.

C. Interest on Late Fees

1. DOE will notify the Purchaser of amounts due only when unpaid or underpaid by the dates specified in paragraph B above. Interest will be levied according to the following formula:

Interest = Unpaid balance due to DOE for assigned three month period × Quarterly Treasury rate plus six percent (6%) × Number of months late including month of payment (fractions rounded up to whole months) ÷ 12

2. Interest is payable at any time prior to the due date for the subsequent assigned three month period fee payment. Nonpayment by the end of the subsequent assigned three month period will result in compounding of interest due. Purchaser shall complete a Standard Remittance Advice of interest payments.

3. Following the assessment of a late fee by DOE, payments will be applied against accrued interest first and the principal thereafter.

D. Effect of Payment

Upon payment of all applicable fees, interest and penalties on upaid or underpaid amounts, the Purchaser shall have no further financial obligation to DOE for the disposal of the accepted SNF and/or HLW.

E. Audit

1. The DOE or its representative shall have the right to perform any audits or inspections necessary to determine whether Purchaser is paying the correct amount under the fee schedule and interest provisions set forth in paragraphs A, B and C above.

2. Nothing in this contract shall be deemed to preclude an audit by the General Accounting Office of any transaction under this contract.

3. The Purchaser shall furnish DOE with such records, reports and data as may be necessary for the determination of quantities delivered hereunder and for final settlement of amounts due under this contract and shall retain and make available to DOE and its authorized representative examination at all reasonable times such records, reports and data for a period of three (3) years from the completion of delivery of all material under this contract.

Article IX—Delays A. Unavoidable Delays by Purchaser or DOE

Neither the Government nor the Purchaser shall be liable under this contract for damages caused by failure to perform its obligations hereunder, if such failure arises out of causes beyond the control and without the fault or negligence of the party failing to perform. In the event circumstances beyond the reasonable control of the Purchaser or DOE—such as acts of God, or of the public enemy, acts of Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather—cause delay in scheduled delivery, acceptance or transport of SNF and/or HLW, the party experiencing the delay will notify the other party as soon as possible after such delay is ascertained and the parties will readjust their schedules, as appropriate, to accommodate such delay.

B. Avoidable Delays by Purchaser or DOE

In the event of any delay in the delivery, acceptance or transport of SNF and/or HLW to or by DOE caused by circumstances within the reasonable control of either the Purchaser or DOE or their respective contractors or suppliers, the charges and schedules specified by this contract will be equitably adjusted to reflect any estimated additional costs incurred by the party not responsible for or contributing to the delay.

Article X—Suspension

A. In addition to any other rights DOE may have hereunder, DOE reserves the right, at no cost to the Government, to suspend this contract or any portion thereof upon written notice to the Purchaser within ninety (90) days of the Purchaser's failure to perform its obligations hereunder, and the Purchaser's failure to take corrective action within thirty (30) days after written notice of such failure to perform as provided above, unless such failure shall arise from causes beyond the control and without the fault or negligence of the Purchaser, its contractors or agents. However, the Purchaser's obligation to pay fees required hereunder shall continue unaffected by any suspension. Any such suspension shall be rescinded if and when DOE determines that Purchaser has completed corrective action.

B. The DOE reserves the right to suspend any scheduled deliveries in the event that a national emergency requires that priority be given to Government programs to the exclusion of the work under this contract. In the event of such a suspension by the Government, the DOE shall refund that portion of payments representing services not delivered as determined by the Contracting Officer to be an equitable adjustment. Any disagreement arising from the refund payment, if any, shall be resolved as provided in the clause of this contract, entitled “DISPUTES.”

Article XI—Remedies

Nothing in this contract shall be construed to preclude either party from asserting its rights and remedies under the contract or at law.

Article XII—Notices

All notices and communications between the parties under this contract (except notices published in the Federal Register) shall be in writing and shall be sent to the following addressees:

To DOE: To the Purchaser:

However, the parties may change the addresses or addressees for such notices or communications without formal modification to this contract; provided, however, that notice of such changes shall be given by registered mail.

Article XIII—Representation Concerning Nuclear Hazards Indemnity

A. DOE represents that it will include in its contract(s) for the operation of any DOE facility an indemnity agreement based upon Section 170(d) of the Atomic Energy Act of 1954, as amended, a copy of which agreement shall be furnished to the Purchaser; that under said agreement, DOE shall have agreed to indemnify the contractor and other persons indemnified against claims for public liability (as defined in said Act) arising out of or in connection with contractual activities; that the indemnity shall apply to covered nuclear incidents which (1) take place at a contract location; or (2) arise out of or in the course of transportation of source, special nuclear or by-product material to or from a contract location. The obligation of DOE to indemnify shall be subject to the conditions stated in the indemnity agreement.

B. The provisions of this Article XIII shall continue beyond the term of this contract.

Article XIV—Assignment

The rights and duties of the Purchaser may be assignable with transfer of title to the SNF and/or HLW involved; provided, however, that notice of any such transfer shall be made to DOE within ninety (90) days of transfer.

Article XV—Amendments

The provisions of this contract has been developed in the light of uncertainties necessarily attendant upon long-term contracts. Accordingly, at the request of either DOE or Purchaser, the parties will negotiate and, to the extent mutually agreed, amend this contract as the parties may deem to be necessary or proper to reflect their respective interests; provided, however, that any such amendment shall be consistent with the DOE final rule published in the Federal Register on April 18, 1983 entitled, “Standard Contract for Disposal or SNF and/or HLW”, as the same may be amended from time to time.

Article XVI—Disputes

A. Except as otherwise provided in this contract, any dispute concerning a question of fact arising under this contract which is not disposed of by agreement shall be decided by the Contracting Officer, who shall reduce his decision to writing and mail or otherwise furnish a copy thereof to the Purchaser. The decision of the Contracting Officer shall be final and conclusive unless within ninety (90) days from the date of receipt of such copy, the Purchaser mails or otherwise furnishes to the Contracting Officer a written appeal addressed to the DOE Board of Contract Appeals (Board). The decision of the Board shall be final and conclusive unless determined by a court of competent jursidiction to have been fraudulent, or capricious, or arbitrary, or so grossly erroneous as necessarily to imply bad faith or not supported by substantial evidence. In connection with any appeal proceeding under this clause, the Purchaser shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision.

B. For Purchaser claims of more than $50,000, the Purchaser shall submit with the claim a certification that the claim is made in good faith; the supporting data are accurate and complete to the best of the Purchaser's knowledge and belief; and the amount requested accurately reflects the contract adjustment for which the Purchaser believes the Government is liable. The certification shall be executed by the Purchaser if an individual. When the Purchaser is not an individual, the certification shall be executed by a senior company official in charge at the Purchaser's plant or location involved, or by an officer or general partner of the Purchaser having overall responsibility for the conduct of the Purchaser's affairs.

C. For Purchaser claims of $50,000 or less, the Contracting Officer must render a decision within sixty (60) days. For Purchaser claims in excess of $50,000, the Contracting Officer must decide the claim within sixty (60) days or notify the Purchaser of the date when the decision will be made.

D. This “Disputes” clause does not preclude consideration of law questions in connection with decisions provided for in paragraph A above; provided, however, that nothing in this contract shall be construed as making final the decision of any administrative official, representative, or board on a question of law.

Article XVII—Officials Not To Benefit

No member of or delegate to Congress or resident commissioner shall be admitted to any share or part of this contract, or to any benefit that may arise therefrom, but this provision shall not be construed to extend to this contract if made with a corporation for its general benefit.

Article XVIII—Covenant Against Contingent Fees

The Purchaser warrants that no person or selling agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Purchaser for the purpose of securing business. For breach or violation of this warranty, the Government shall have the right to annul this contract without liability or in its discretion to increase the contract price or consideration, or otherwise recover, the full amount of such commission, brokerage, or contingent fee.

Article XIX—Examination of Records

The Purchaser agrees that the Comptroller General of the United States or any of his duly authorized representatives shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Purchaser involving transactions related to this contract until the expiration of three years after final payment under this contract.

Article XX—Permits

The Government and the Purchaser shall procure all necessary permits or licenses (including any special nuclear material licenses) and comply with all applicable laws and regulations of the United States, States and municipalities necessary to execute their respective responsibilities and obligations under this contract.

Article XXI—Rights in Technical Data A. Definitions.

1. Technical data means recorded information regardless of form or characteristic, of a specific or technical nature. It may, for example, document research, experimental, developmental, or demonstration, or engineering work, or be usable or used to define a design or process, or to procure, produce, support, maintain or operate material. The data may be graphic or pictorial delineations in media such as drawings or photographs, text in specifications or related performance or design-type documents or computer software (including computer programs, computer software data bases, and computer software documentation). Examples of technical data include research and engineering data, engineering drawings and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog item identification, and related information. Technical data as used herein do not include financial reports, cost analyses, and other information incidental to contract administration.

2. Proprietary data means technical data which embody trade secrets developed at private expense, such as design procedures or techniques, chemical composition of materials, or manufacturing methods, processes, or treatments, including minor modifications thereof, provided that such data:

(a) Are not generally known or available from other sources without obligation concerning their confidentiality;

(b) Have not been made available by the owner to others without obligation concerning its confidentiality; and

(c) Are not already available to the Government without obligation concerning their confidentiality.

3. Contract data means technical data first produced in the performance of the contract, technical data which are specified to be delivered under the contract, or technical data actually delivered in connection with the contract.

4. Unlimited rights means rights to use, duplicate, or disclose technical data, in whole or in part, in any manner and for any purpose whatsoever, and to permit others to do so.

B. Allocation of Rights.

1. The Government shall have:

(a) Unlimited rights in contract data except as otherwise provided below with respect to proprietary data properly marked as authorized by this clause;

(b) The right to remove, cancel, correct or ignore any marking not authorized by the terms of this contract on any technical data furnished hereunder, if in response to a written inquiry by DOE concerning the proprietary nature of the markings, the Purchaser fails to respond thereto within 60 days or fails to substantiate the proprietary nature of the markings. In either case, DOE will notify the Purchaser of the action taken;

(c) No rights under this contract in any technical data which are not contract data.

2. Subject to the foregoing provisions of this rights in technical data clause, the Purchaser shall have the right to mark proprietary data it furnishes under the contract with the following legend and no other, the terms of which shall be binding on the Government:

Limited Rights Legend

This “proprietary data,” furnished under “Contract No. ____” with the U.S. Department of Energy may be duplicated and used by the Government with the express limitations that the “proprietary data” may not be disclosed outside the Government or be used for purposes of manufacture without prior permission of the Purchaser, except that further disclosure or use may be made solely for the following purposes:

(a) This “proprietary data” may be disclosed for evaluation purposes under the restriction that the “proprietary data” be retained in confidence and not be further disclosed;

(b) This “proprietary data” may be disclosed to contractors participating in the Government's program of which this contract is a part, for information or use in connection with the work performed under their contracts and under the restriction that the “proprietary data” be retained in confidence and not be further disclosed; or

(c) This “proprietary data” may be used by the Government or others on its behalf for emergency work under the restriction that the “proprietary data” be retained in confidence and not be further disclosed. This legend shall be marked on any reproduction of this data in whole or in part.

3. In the event that proprietary data of a third party, with respect to which the Purchaser is subject to restrictions on use or disclosure, is furnished with the Limited Rights Legend above, Purchaser shall secure the agreement of such third party to the rights of the Government as set forth in the Limited Rights Legend. DOE shall upon request furnish the names of those contractors to which proprietary data has been disclosed.

Article XXII—Entire Contract

A. This contract, which consists of Articles I through XXII and appendices A through G, annexed hereto and made a part hereof, contains the entire agreement between the parties with respect to the subject matter hereof. Any representation, promise, or condition not incorporated in this contract shall not be binding on either party. No course of dealing or usage of trade or course of performance shall be relevant to explain or supplement any provision contained in this contract.

B. Nothing in this contract is intended to affect in any way the contractual obligation of any other persons with whom the Purchaser may have contracted with respect to assuming some or all disposal costs or to accept title to SNF and/or HLW.

C. Appendices A. Nuclear Power Reactor(s) or Other Facilities Covered B. Discharge Information (Ten Year; Annual) C. Delivery Commitment Schedule D. Final Delivery Schedule E. General Specifications F. Detailed Description of Purchaser's Fuel G. Standard Remittance Advice For Payment of Fees

In witness whereof, the parties hereto have executed this contract as of the day and year first above written.

United States of America United States Department of Energy By: (Contracting Officer) Witnesses as to Execution on Behalf of Purchaser (Name) (Address) (Name) (Address) (Purchaser's Company Name) By: Title:

I, (Name), certify that I am the (Title) of the corporation named as Purchaser herein; that (Name) who signed this document on behalf of the Purchaser was then (Title) of said corporation; that said document was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

In Witness Whereof, I have hereunto affixed my hand and the seal of said corporation this ____ day of ____, 1983

(Corporate Seal)

(Signature) Appendix A Nuclear Power Reactor(s) or Other Facilities Covered Purchaser Contract Number/Date ____/____ Reactor/Facility Name Location: Street City County/State ________/ Zip Code Capacity (MWE)__Gross Reactor Type:

BWR □

PWR □

Other (Identify) Facility Description Date of Commencement of Operation (actual or estimated) NRC License #: By Purchaser: Signature Title Date Appendix B Ten Year Discharge Forecast

To be used for DOE planning purposes only and does not represent a firm commitment by Purchaser.

Purchaser Contract Number/Date ________/ Reactor/Facility Name Location: Street City County/State ________/ Zip Code Type: BWR □ PWR □ Other (Identify)

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 10 yr total

Discharge date—mo/yr (or refueling shut down date)

Metric tons:

—initial

—discharged

Number of assemblies discharged (per cycle)

By Purchaser:

Signature Title Date Appendix B (Enclosure 1) Actual Discharges Purchaser Contract Number/Date Reactor/Facility Name Location: Street City County/State Zip Code Type:

BWR □

PWR □

Other (Identify) Refueling Shutdown Date Metric Tons Uranium (Initial/Discharged); Initial Discharged Number of Assemblies Discharged:

Any false, fictitious or fraudulent statement may be punishable by fine or imprisonment (U.S. Code, Title 18, Section 1001).

By Purchaser: Signature Title Date Appendix C Delivery Commitment Schedule

This delivery commitment schedule shall be submitted by Purchaser to DOE as specified in Article V.B. of this contract.

Purchaser Contract Number/Date Reactor/Facility Name Location: Street City County/State Zip Code Type Cask Required: Shipping Lot Number (Assigned by DOE) Proposed Shipping Mode:

Truck □

Rail □

Barge □

DOE Assigned Delivery Commitment Date Range of Discharge Date(s) (Earliest to Latest) Mo____ Day____ Yr____ to Mo____ Day____ Yr____ Metric Tons Uranium: (Initial) (Discharged) Number of Assemblies: BWR PWR Other

Unless otherwise agreed to in writing by DOE, the Purchaser shall furnish herewith to DOE suitable proof of ownership of the SNF and/or HLW to be delivered hereunder. The Purchaser shall notify DOE in writing at the earliest practicable date of any change in said ownership.

Any false, fictitious or fraudulent statement may be punishable by fine or imprisonment (U.S. Code, Title 18, Section 1001).

By Purchaser: Signature Title Date Approved by DOE: Technical Representative Title Date Contracting Officer Date Appendix D Final Delivery Schedule (To be submitted to DOE by Purchaser for each designated Purchaser Delivery site not later than twelve (12) months prior to estimated date of first delivery) Purchaser: Contract Number/Date Reactor/Facility Name Location: Street City County/State Zip Code Type(s) cask(s) required: No. Assembilies per cask Shipping Lot Number Shipping Mode: (Assigned by DOE) Truck Rail Barge Metric Tons Uranium: (Initial) (Discharged) Range of Discharge Date(s) (Earliest to Latest) (From approved commitment schedule) Mo____ Day____ Yr____ to Mo____ Day____ Yr____ Number of Assemblies: BWR PWR Other Purchaser's Delivery First Estimate Mo____ Day____ Yr____ last Mo____ Day____ Mo____

Unless otherwise agreed to in writing by DOE, the Purchaser shall furnish herewith to DOE suitable proof of ownership of the SNF and/or HLW to be delivered hereunder. The Purchaser shall notify DOE in writing at the earliest practicable date of any change in said ownership.

To confirm acceptability of delivery date(s):

Purchaser Contact Phone Title DOE Contact Phone Title

Any false, fictitious or fraudulent statement may be punishable by fine or imprisonment (U.S. Code, Title 18, Section 1001).

By Purchaser: Signature Title Date Approved by DOE: Technical Representative Title Date Contracting Officer Date Appendix E General Specifications A. Fuel Category Identification

1. Categories—Purchaser shall use reasonable efforts, utilizing technology equivalent to and consistent with the commercial practice, to properly classify Spent Nuclear Fuel (SNF) prior to delivery to DOE, as follows:

a. Standard Fuel means SNF that meets all the General Specifications therefor set forth in paragraph B below.

b. Nonstandard Fuel means SNF that does not meet one or more of the General Specifications set forth in subparagraphs 1 through 5 of paragraph B below, and which is classified as Nonstandard Fuel Classes NS-1 through NS-5, pursuant to paragraph B below.

c. Failed Fuel means SNF that meets the specifications set forth in subparagraphs 1 through 3 of paragraph B below, and which is classified as Failed Fuel Class F-1 through F-3 pursuant to subparagraph 6 of paragraph B below.

d. Fuel may have “Failed Fuel” and/or several “Nonstandard Fuel” classifications

B. Fuel Description and Subclassification—General Specifications

1. Maximum Nominal Physical Dimensions.

Boiling water reactor (BWR) | Pressurized water reactor (PWR)

Overall Length | 14 feet, 11 inches | 14 feet, 10 inches.

Active Fuel Length | 12 feet, 6 inches | 12 feet, 0 inches.

Cross Section 1 | 6 inches × 6 inches | 9 inches × 9 inches.

1 The cross section of the fuel assembly shall not include the channel.

Note: Fuel that does not meet these specifications shall be classified as Nonstandard Fuel—Class NS-1.

2. Nonfuel Components. Nonfuel components including, but not limited to, control spiders, burnable poison rod assemblies, control rod elements, thimble plugs, fission chambers, and primary and secondary neutron sources, that are contained within the fuel assembly, or BWR channels that are an integral part of the fuel assembly, which do not require special handling, may be included as part of the spent nuclear fuel delivered for disposal pursuant to this contract.

Note:

Fuel that does not meet these specifications shall be classified as Nonstandard Fuel—Class NS-2.

3. Cooling. The minimum cooling time for fuel is five (5) years.

Note:

Fuel that does not meet this specification shall be classified as Nonstandard Fuel—Class NS-3.

4. Non-LWR Fuel. Fuel from other than LWR power facilities shall be classified as Nonstandard Fuel—Class NS-4. Such fuel may be unique and require special handling, storage, and disposal facilities.

5. Consolidated Fuel Rods. Fuel which has been disassembled and stored with the fuel rods in a consolidated manner shall be classified as Nonstandard Fuel Class NS-5.

6. Failed Fuel.

a. Visual Inspection.

Assemblies shall be visually inspected for evidence of structural deformity or damage to cladding or spacers which may require special handling. Assemblies which [i] are structurally deformed or have damaged cladding to the extent that special handling may be required or [ii] for any reason cannot be handled with normal fuel handling equipment shall be classified as Failed Fuel—Class F-1.

b. Previously Encapsulated Assemblies.

Assemblies encapsulated by Purchaser prior to classification hereunder shall be classified as Failed Fuel—Class F-3. Purchaser shall advise DOE of the reason for the prior encapsulation of assemblies in sufficient detail so that DOE may plan for appropriate subsequent handling.

c. Regulatory Requirements.

Spent fuel assemblies shall be packaged and placed in casks so that all applicable regulatory requirements are met.

C. Summary of Fuel Classifications

1. Standard Fuel:

a. Class S-1: PWR

b. Class S-2: BWR

2. Nonstandard Fuel:

a. Class NS-1: Physical Dimensions

b. Class NS-2: Non Fuel Components

c. Class NS-3: Short Cooled

d. Class NS-4: Non-LWR

e. Class NS-5: Consolidated Fuel Rods.

3. Failed Fuel:

a. Class F-1: Visual Failure or Damage

b. Class F-2: Radioactive “Leakage”

c. Class F-3: Encapsulated

D. High-Level Radioactive Waste

The DOE shall accept high-level radioactive waste. Detailed acceptance criteria and general specifications for such waste will be issued by the DOE no later than the date on which DOE submits its license application to the Nuclear Regulatory Commission for the first disposal facility.

Appendix F Detailed Description of Purchaser's Fuel

This information shall be provided by Purchaser for each distinct fuel type within a Shipping Lot not later than sixty (60) days prior to the schedule transportation date.

Purchaser Contract Number/Date ____/________ Reactor/Facility Name__

I. Drawings included in generic dossier: ________

1. Fuel Assembly DWG# ____ 2. Upper & Lower end fittings DWG# ____ Dossier Number: ____ DOE Shipping Lot #: ____ # Assemblies Described: ______BWR ______PWR ______Other

II. Design Material Descriptions.

Fuel Element: 1. Element type ____ (rod, plate, etc.) 2. Total length) ____/(in.) 3. Active length ____ (in.) 4. Cladding material ____ (Zr, s.s., etc.) Assembly Description: 1. Number of Elements ____ 2. Overall dimensions (length ____ (cross section) ____ (in.) 3. Overall weight ____

III. Describe any distortions, cladding damage or other damage to the spent fuel, or nonfuel components within this Shipping Lot which will require special handling procedures. (Attach additional pages if needed.)

IV. Assembly Number ____

Shipping Lot #____

Irradiation history cycle No.

1 | 2 | 3 | 4 | 5

1. Startup date (mo/day/yr)

2. Shutdown date (mo/day/yr)

3. Cumulative fuel exposure (mwd/mtu)

4. Avg. reactor power (mwth)

5. Total heat output/assembly in watts, using an approved calculational method: ________ as of Date ________

Any false, fictitious or fradulent statement may be punishable by fine or imprisonment (U.S. Code, Title 18, Section 1001).

By Purchaser:

Signature Title Date Annex B to Appendix G Standard Remittance of Advice (RA) for Payment of Fees

This Annex should be completed only for SNF burned before midnight between April 6/7, 1983.

I. Identification

A. Purchaser:____________

B. Unit identification (Only one unit may be covered in each report.)

1. Reactor/Facility Name: 2. Location: 3. Type: 4. Capacity: 5. Date of Commencement of Operations: 6. NRC License No.:

II. Fee Calculation

A. Discharged nuclear fuel

1. Burnup 1 (MWDT/MTU) | 0− | 5,000− | 10,000 | 20,000

5,000 | 10,000 | 20,000 | up

2. Initial loading (KgU) (with indicated burnup)

3. Fee rate ($/KgU) | 80.00 | 142.00 | 162.00 | 184.00

4. Fee ($)

5. Total fee (4)

B. Nuclear fuel in the reactor core as of midnight of 6/7 April 1983.

Assembly identification | Initial loading (KgU) | Burnup 1 as of midnight 6/7 April 1983 (MWDT/MTU) | Fee

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

1 Please provide (as an attachment) a clear reference to the methodology used to derive the burnup figures (computer codes, etc.) and a clear reference to all data used in the derivation of those figures.

C. Total fee.

(Approved by the Office of Management and Budget under control number 1091-0260)

[48 FR 16599, Apr. 18, 1983; 48 FR 23160, May 24, 1983, as amended at 52 FR 35359, Sept. 18, 1987; 56 FR 67659, Dec. 31, 1991]

PART 962 BYPRODUCT MATERIAL

Authority: The Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.); Energy Reorganization Act of 1974 (42 U.S.C. 5801 et seq.); Department of Energy Organization Act (42 U.S.C. 7101 et seq.); Nuclear Waste Policy Act (Pub. L. 97-425, 96 Stat. 2201).

Source: 52 FR 15940, May 1, 1987, unless otherwise noted.

§ 962.1 Scope.

This part applies only to radioactive waste substances which are owned or produced by the Department of Energy at facilities owned or operated by or for the Department of Energy under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq). This part does not apply to substances which are not owned or produced by the Department of Energy.

§ 962.2 Purpose.

The purpose of this part is to clarify the meaning of the term “byproduct material” under section 11e(1) of the Atomic Energy Act of 1954 (42 U.S.C. 2014(e)(1)) for use only in determining the Department of Energy's obligations under the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.) with regard to radioactive waste substances owned or produced by the Department of Energy pursuant to the exercise of its responsibilities under the Atomic Energy Act of 1954. This part does not affect materials defined as byproduct material under section 11e(2) of the Atomic Energy Act of 1954 (42 U.S.C. 2014(e)(2)).

§ 962.3 Byproduct material.

(a) For purposes of this part, the term byproduct material means any radioactive material (except special nuclear material) yielded in or made radioactive by exposure to the radiation incident to the process of producing or utilizing special nuclear material.

(b) For purposes of determining the applicability of the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.) to any radioactive waste substance owned or produced by the Department of Energy pursuant to the exercise of its atomic energy research, development, testing and production responsibilities under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.), the words “any radioactive material,” as used in paragraph (a) of this section, refer only to the actual radionuclides dispersed or suspended in the waste substance. The nonradioactive hazardous component of the waste substance will be subject to regulation under the Resource Conservation and Recovery Act.

PART 963 YUCCA MOUNTAIN SITE SUITABILITY GUIDELINES

Authority: 42 U.S.C. 2011 et seq.; 42 U.S.C. 7101 et seq.; 42 U.S.C. 10101, et seq.

Source: 66 FR 57336, Nov. 14, 2001, unless otherwise noted.

Subpart A General Provisions

§ 963.1 Purpose.

(a) The purpose of this part is to establish DOE methods and criteria for determining the suitability of the Yucca Mountain site for the location of a geologic repository. DOE will use these methods and criteria in analyzing the data from the site characterization activities required under section 113 of the Nuclear Waste Policy Act.

(b) This part does not address other information that must be considered and submitted to the President, and made available to the public, by the Secretary under section 114 of the Nuclear Waste Policy Act if the Yucca Mountain site is recommended for development as a geologic repository.

§ 963.2 Definitions.

For purposes of this part:

Applicable radiation protection standard means (1) For the preclosure period, the preclosure numerical radiation dose limits in 10 CFR 63.111(a) and (b) and 63.204; and

(2) For the postclosure period, the postclosure numerical radiation dose limits in 10 CFR 63.311 and 63.321 and radionuclide concentration limits in 10 CFR 63.331.

Barrier means any material, structure or feature that prevents or substantially reduces the rate of movement of water or radionuclides from the Yucca Mountain repository to the accessible environment, or prevents the release or substantially reduces the release rate of radionuclides from the waste. For example, a barrier may be a geologic feature, an engineered structure, a canister, a waste form with physical and chemical characteristics that significantly decrease the mobility of radionuclides, or a material placed over and around the waste, provided that the material substantially delays movement of water or radionuclides.

Cladding is the metallic outer sheath of a fuel rod element; it is generally made of a corrosion resistant zirconium alloy or stainless steel, and is intended to isolate the fuel from the external environment.

Closure means the final closing of the remaining open operational areas of the underground facility and boreholes after termination of waste emplacement, culminating in the sealing of shafts and ramps, except those openings that may be designed for ventilation or monitoring.

Colloid means any fine-grained material in suspension, or any such material that can be easily suspended.

Criteria means the characterizing traits relevant to assessing the performance of a geologic repository, as defined by this section, at the Yucca Mountain site.

Design means a description of the engineered structures, systems, components and equipment of a geologic repository at Yucca Mountain that includes the engineered barrier system.

Design bases means that information that identifies the specific functions to be performed by a structure, system, or component of a facility and the specific values or ranges of values chosen for controlling parameters as reference bounds for design. These values may be constraints derived from generally accepted “state-of-the-art” practices for achieving functional goals or requirements derived from analysis (based on calculation or experiments) of the effects of a postulated event under which a structure, system, or component must meet its functional goals. The values for controlling parameters for external events include:

(1) Estimates of severe natural events to be used for deriving design bases that will be based on consideration of historical data on the associated parameters, physical data, or analysis of upper limits of the physical processes involved; and

(2) Estimates of severe external human-induced events to be used for deriving design bases, that will be based on analysis of human activity in the region, taking into account the site characteristics and the risks associated with the event.

DOE means the U.S. Department of Energy, or its duly authorized representatives.

Engineered barrier system means the waste packages, including engineered components and systems other than the waste package (e.g., drip shields), and the underground facility.

Event sequence means a series of actions and/or occurrences within the natural and engineered components of a geologic repository operations area that could potentially lead to exposure of individuals to radiation. An event sequence includes one or more initiating events and associated combinations of repository system component failures, including those produced by the action or inaction of operating personnel. Those event sequences that are expected to occur one or more times before permanent closure of the geologic repository operations area are referred to as Category 1 event sequences. Other event sequences that have at least one chance in 10,000 of occurring before permanent closure are referred to as Category 2 event sequences.

Geologic repository means a system that is intended to be used for, or may be used for, the disposal of radioactive wastes in excavated geologic media. A geologic repository includes the engineered barrier system and the portion of the geologic setting that provides isolation of the radioactive waste.

Geologic repository operations area means a high-level radioactive waste facility that is part of a geologic repository, including both surface and subsurface areas, where waste handling activities are conducted.

Geologic setting means geologic, hydrologic, and geochemical system of the region in which a geologic repository is or may be located.

High-level radioactive waste means

(1) The highly radioactive material resulting from the reprocessing of spent nuclear fuel, including liquid waste produced directly in reprocessing and any solid material derived from such liquid waste that contains fission products in sufficient concentration; and

(2) Other highly radioactive material that the Commission, consistent with existing law, determines by rule requires permanent isolation.

Human intrusion means breaching of any portion of the Yucca Mountain disposal system within the repository footprint by any human activity.

Infiltration means the flow of a fluid into a solid substance through pores or small openings; specifically, the movement of water into soil and fractured or porous rock.

Initiating event means a natural or human induced event that causes an event sequence.

Near-field means the region where the adjacent natural geohydrologic system has been significantly impacted by the excavation of the repository and the emplacement of the waste.

NRC means the U.S. Nuclear Regulatory Commission or its duly authorized representatives.

Perched water means ground water of limited lateral extent separated from an underlying body of ground water by an unsaturated zone.

Preclosure means the period of time before and during closure of the geologic repository.

Preclosure safety evaluation means a preliminary assessment of the adequacy of repository support facilities to prevent or mitigate the effects of postulated initiating events and event sequences and their consequences (including fire, radiation, criticality, and chemical hazards), and the site, structures, systems, components, equipment, and operator actions that would be relied on for safety.

Postclosure means the period of time after the closure of the geologic repository.

Radioactive waste or waste means high-level radioactive waste and other radioactive materials, including spent nuclear fuel, that are received for emplacement in the geologic repository.

Reasonably maximally exposed individual means the hypothetical person meeting the criteria specified at 10 CFR 63.312.

Reference biosphere means the description of the environment, inhabited by the reasonably maximally exposed individual. The reference biosphere comprises the set of specific biotic and abiotic characteristics of the environment, including, but not limited to, climate, topography, soils, flora, fauna, and human activities.

Seepage means the inflow of ground water moving in fractures or pore spaces of permeable rock to an open space in the rock such as an excavated drift.

Sensitivity study means an analytic or numerical technique for examining the effects on model outcomes, such as radionuclide releases, of varying specified parameters, such as the infiltration rate due to precipitation.

Site characterization means activities, whether in the laboratory or in the field, undertaken to establish the geologic conditions and the ranges of the parameters of a candidate site relevant to the location of a repository, including borings, surface excavations, excavations of exploratory shafts, limited subsurface lateral excavations and borings, and in situ testing needed to evaluate the suitability of a candidate site for the location of a repository, but not including preliminary borings and geophysical testing needed to assess whether site characterization should be undertaken.

Surface facilities means all permanent facilities within the restricted area constructed in support of site characterization activities and repository construction, operation, and closure activities, including surface structures, utility lines, roads, railroads, and similar facilities, but excluding the underground facility.

System performance means the complete behavior of a geologic repository system at Yucca Mountain in response to the features, events, and processes that may affect it.

Total system performance assessment means a probabilistic analysis that is used to:

(1) Identify the features, events and processes (except human intrusion) that might affect the Yucca Mountain disposal system and their probabilities of occurring during 10,000 years after disposal;

(2) Examine the effects of those features, events, processes, and sequences of events and processes (except human intrusion) on the performance of the Yucca Mountain disposal system; and

(3) Estimate the dose incurred by the reasonably maximally exposed individual, including associated uncertainties, as a result of releases caused by all significant features, events, processes, and sequences of events and processes, weighted by their probability of occurrence.

Underground facility means the underground structure, backfill materials, if any, and openings that penetrate the underground structure (e.g., ramps, shafts and boreholes, including their seals).

Waste form means the radioactive waste materials and any encapsulating or stabilizing matrix.

Waste package means the waste form and any containers, shielding, packing, and other absorbent materials immediately surrounding an individual waste container.

Yucca Mountain disposal system means the combination of underground engineered and natural barriers within the controlled area that prevents or substantially reduces releases from the waste.

Yucca Mountain site means the candidate site in the State of Nevada recommended by the Secretary to the President under section 112(b)(1)(B) of the Nuclear Waste Policy Act of 1982 (NWPA) (42 U.S.C. 1032(b)(1)(B)) on May 27, 1986.

Subpart B Site Suitability Determination, Methods, and Criteria

§ 963.10 Scope.

(a) The scope of this subpart includes the following for both the preclosure and postclosure periods:

(1) The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;

(2) The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and

(3) The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.

(b) DOE will seek NRC concurrence on any future revisions to this subpart.

§ 963.11 Suitability determination.

DOE will evaluate whether the Yucca Mountain site is suitable for the location of a geologic repository on the basis of the preclosure and postclosure determinations described in §§ 963.12 and 963.15. If DOE's evaluation of the Yucca Mountain site for the location of a geologic repository under §§ 963.12 and 963.15 shows that the geologic repository is likely to meet the applicable radiation protection standards for the preclosure and postclosure periods, then DOE may determine that the site is a suitable location for the development of such a repository.

§ 963.12 Preclosure suitability determination.

DOE will apply the method and criteria described in §§ 963.13 and 963.14 to evaluate the suitability of the Yucca Mountain site for the preclosure period. If DOE finds that the results of the preclosure safety evaluation conducted under § 963.13 show that the Yucca Mountain site is likely to meet the applicable radiation protection standard, DOE may determine the site suitable for the preclosure period.

§ 963.13 Preclosure suitability evaluation method.

(a) DOE will evaluate preclosure suitability using a preclosure safety evaluation method. DOE will evaluate the performance of the geologic repository at the Yucca Mountain site using the method described in paragraph (b) of this section and the criteria in § 963.14. DOE will consider the performance of the system in terms of the criteria to evaluate whether the geologic repository is likely to comply with the applicable radiation protection standard.

(b) The preclosure safety evaluation method, using preliminary engineering specifications, will assess the adequacy of the repository facilities to perform their intended functions and prevent or mitigate the effects of postulated Category 1 and 2 event sequences. The preclosure safety evaluation will consider:

(1) A preliminary description of the site characteristics, the surface facilities and the underground operating facilities;

(2) A preliminary description of the design bases for the operating facilities and a preliminary description of any associated limits on operation;

(3) A preliminary description of potential hazards, event sequences, and their consequences; and

(4) A preliminary description of the structures, systems, components, equipment, and operator actions intended to mitigate or prevent accidents.

§ 963.14 Preclosure suitability criteria.

DOE will evaluate preclosure suitability using the following criteria:

(a) Ability to contain radioactive material and to limit releases of radioactive materials;

(b) Ability to implement control and emergency systems to limit exposure to radiation;

(c) Ability to maintain a system and components that perform their intended safety functions; and

(d) Ability to preserve the option to retrieve wastes during the preclosure period.

§ 963.15 Postclosure suitability determination.

DOE will apply the method and criteria described in §§ 963.16 and 963.17 to evaluate the suitability of the Yucca Mountain site for the postclosure period. If DOE finds that the results of the total system performance assessments conducted under § 963.16 show that the Yucca Mountain site is likely to meet the applicable radiation protection standard, DOE may determine the site suitable for the postclosure period.

§ 963.16 Postclosure suitability evaluation method.

(a) DOE will evaluate postclosure suitability using the total system performance assessment method. DOE will conduct a total system performance assessment to evaluate the ability of the geologic repository to meet the applicable radiation protection standard under the following circumstances:

(1) DOE will conduct a total system performance assessment to evaluate the ability of the Yucca Mountain disposal system to limit radiological doses and radionuclide concentrations in the case where there is no human intrusion into the repository. DOE will model the performance of the Yucca Mountain disposal system using the method described in paragraph (b) of this section and the criteria in § 963.17. DOE will consider the performance of the system in terms of the criteria to evaluate whether the Yucca Mountain disposal system is likely to comply with the applicable radiation protection standard.

(2) DOE will conduct a separate total system performance assessment to evaluate the ability of the Yucca Mountain disposal system to limit radiological doses in the case where there is a human intrusion as specified by 10 CFR 63.322. DOE will model the performance of the Yucca Mountain disposal system using the method described in paragraph (b) of this section and the criteria in § 963.17. If required by applicable NRC regulations regarding a human intrusion standard, § 63.321, DOE will consider the performance of the system in terms of the criteria to evaluate whether the Yucca Mountain disposal system is likely to comply with the applicable radiation protection standard.

(b) In conducting a total system performance assessment under this section, DOE will:

(1) Include data related to the suitability criteria in § 963.17;

(2) Account for uncertainties and variabilities in parameter values and provide the technical basis for parameter ranges, probability distributions, and bounding values;

(3) Consider alternative models of features and processes that are consistent with available data and current scientific understanding, and evaluate the effects that alternative models would have on the estimated performance of the Yucca Mountain disposal system ;

(4) Consider only events that have at least one chance in 10,000 of occurring over 10,000 years;

(5) Provide the technical basis for either inclusion or exclusion of specific features, events, and processes of the geologic setting, including appropriate details as to magnitude and timing regarding any exclusions that would significantly change the dose to the reasonably maximally exposed individual;

(6) Provide the technical basis for either inclusion or exclusion of degradation, deterioration, or alteration processes of engineered barriers, including those processes that would adversely affect natural barriers, (such as degradation of concrete liners affecting the pH of ground water or precipitation of minerals due to heat changing hydrologic processes), including appropriate details as to magnitude and timing regarding any exclusions that would significantly change the dose to the reasonably maximally exposed individual;

(7) Provide the technical basis for models used in the total system performance assessment such as comparisons made with outputs of detailed process-level models and/or empirical observations (for example, laboratory testing, field investigations, and natural analogs);

(8) Identify natural features of the geologic setting and design features of the engineered barrier system important to isolating radioactive waste;

(9) Describe the capability of the natural and engineered barriers important to isolating radioactive waste, taking into account uncertainties in characterizing and modeling such barriers;

(10) Provide the technical basis for the description of the capability of the natural and engineered barriers important to isolating radioactive waste;

(11) Use the reference biosphere and reasonably maximally exposed individual assumptions specified in applicable NRC regulations; and

(12) Conduct appropriate sensitivity studies.

§ 963.17 Postclosure suitability criteria.

(a) DOE will evaluate the postclosure suitability of a geologic repository at the Yucca Mountain site through suitability criteria that reflect both the processes and the models used to simulate those processes that are important to the total system performance of the geologic repository. The applicable criteria are:

(1) Site characteristics, which include:

(i) Geologic properties of the site—for example, stratigraphy, rock type and physical properties, and structural characteristics;

(ii) Hydrologic properties of the site—for example, porosity, permeability,moisture content, saturation, and potentiometric characteristics;

(iii) Geophysical properties of the site—for example, densities, velocities and water contents, as measured or deduced from geophysical logs; and

(iv) Geochemical properties of the site—for example, precipitation, dissolution characteristics, and sorption properties of mineral and rock surfaces.

(2) Unsaturated zone flow characteristics, which include:

(i) Climate—for example, precipitation and postulated future climatic conditions;

(ii) Infiltration—for example, precipitation entering the mountain in excess of water returned to the atmosphere by evaporation and plant transpiration;

(iii) Unsaturated zone flux—for example, water movement through the pore spaces, or flowing along fractures or through perched water zones above the repository;

(iv) Seepage—for example, water dripping into the underground repository openings from the surrounding rock.

(3) Near field environment characteristics, which include:

(i) Thermal hydrology—for example, effects of heat from the waste on water flow through the site, and the temperature and humidity at the engineered barriers.

(ii) Near field geochemical environment—for example, the chemical reactions and products resulting from water contacting the waste and the engineered barrier materials.

(4) Engineered barrier system degradation characteristics, which include:

(i) Engineered barrier system component performance—for example, drip shields, backfill, coatings, or chemical modifications, and

(ii) Waste package degradation—for example, the corrosion of the waste package materials within the near-field environment.

(5) Waste form degradation characteristics, which include:

(i) Cladding degradation—for example, corrosion or break-down of the cladding on the spent fuel pellets;

(ii) Waste form dissolution—for example, the ability of individual radionuclides to dissolve in water penetrating breached waste packages.

(6) Engineered barrier system degradation, flow, and transport characteristics, which include:

(i) Colloid formation and stability—for example, the formation of colloidal particles and the ability of radionuclides to adhere to these particles as they may migrate through the remaining barriers; and

(ii) Engineered barrier transport—for example, the movement of radionuclides dissolved in water or adhering to colloidal particles to be transported through the remaining engineered barriers and in the underlying unsaturated zone.

(7) Unsaturated zone flow and transport characteristics, which include:

(i) Unsaturated zone transport—for example, the movement of water with dissolved radionuclides or colloidal particles through the unsaturated zone underlying the repository, including retardation mechanisms such as sorption on rock or mineral surfaces;

(ii) Thermal hydrology—for example, effects of heat from the waste on water flow through the site.

(8) Saturated zone flow and transport characteristics, which include:

(i) Saturated zone transport—for example, the movement of water with dissolved radionuclides or colloidal particles through the saturated zone underlying and beyond the repository, including retardation mechanisms such as sorption on rock or mineral surfaces; and

(ii) Dilution—for example, diffusion of radionuclides into pore spaces, dispersion of radionuclides along flow paths, and mixing with non-contaminated ground water.

(9) Biosphere characteristics, which include:

(i) Reference biosphere and reasonably maximally exposed individual—for example, biosphere water pathways, location and behavior of reasonably maximally exposed individual; and

(ii) Biosphere transport and uptake—for example, the consumption of ground or surface waters through direct extraction or agriculture, including mixing with non-contaminated waters and exposure to contaminated agricultural products.

(b) DOE will evaluate the postclosure suitability of the Yucca Mountain disposal system using criteria that consider disruptive processes and events important to the total system performance of the geologic repository. The applicable criteria related to disruptive processes and events include:

(1) Volcanism—for example, the probability and potential consequences of a volcanic eruption intersecting the repository;

(2) Seismic events—for example, the probability and potential consequences of an earthquake on the underground facilities or hydrologic system; and

(3) Nuclear criticality—for example, the probability and potential consequences of a self-sustaining nuclear reaction as a result of chemical or physical processes affecting the waste either in or after release from breached waste packages.

964-999 PARTS 964-999 [RESERVED]

CHAPTER X DEPARTMENT OF ENERGY (GENERAL PROVISIONS)

PART 1002 OFFICIAL SEAL AND DISTINGUISHING FLAG

Authority: 42 U.S.C. 7264.

Source: 43 FR 20782, May 15, 1978, unless otherwise noted.

Subpart A General

§ 1002.1 Purpose.

The purpose of this part is to describe the official seal and distinguishing flag of the Department of Energy, and to prescribe rules for their custody and use.

§ 1002.2 Definitions.

For purposes of this part—

(a) DOE means all organizational units of the Department of Energy.

(b) Embossing seal means a display of the form and content of the official seal made on a die so that the seal can be embossed on paper or other medium.

(c) Official seal means the original(s) of the seal showing the exact form, content, and colors therof.

(d) Replica means a copy of the official seal displaying the identical form, content, and colors thereof.

(e) Reproduction means a copy of the official seal displaying the form and content thereof, reproduced in only one color.

(f) Secretary means the Secretary of DOE.

§ 1002.3 Custody of official seal and distinguishing flags.

The Secretary or his designee shall:

(a) Have custody of:

(1) The official seal and prototypes thereof, and masters, molds, dies, and all other means of producing replicas, reproductions, and embossing seals; and

(2) Production, inventory and loan records relating to items specified in paragraph (a)(1) of this section; and

(b) Have custody of distinguishing flags, and be responsible for production, inventory, and loan records thereof.

Subpart B Official Seal

§ 1002.11 Description of official seal.

The Department of Energy hereby prescribes as its official seal, of which judicial notice shall be taken pursuant to section 654 of the Department of Energy Organization Act of 1977, 42 U.S.C. 7264, the imprint illustrated below and described as follows:

(a)(1) The official seal includes a green shield bisected by a gold-colored lightning bolt, on which is emblazoned a gold-colored symbolic sun, atom, oil derrick, windmill, and dynamo. It is crested by the white head of an eagle, atop a white rope. Both appear on a blue field surrounded by concentric circles in which the name of the agency, in gold, appears on a green background. Detailing is in black.

(2) The colors used in the configuration are dark green, dark blue, gold, black, and white.

(3) The eagle represents the care in planning and the purposefulness of efforts required to respond to the Nation's increasing demands for energy. The sun, atom, oil derrick, windmill, and dynamo serve as representative technologies whose enhanced development can help meet these demands. The rope represents the cohesiveness in the development of the technologies and their link to our future capabilities. The lightning bolt represents the power of the natural forces from which energy is derived and the Nation's challenge in harnessing the forces.

(4) The color scheme is derived from nature, symbolizing both the source of energy and the support of man's existence. The blue field represents air and water, green represents mineral resources and the earth itself, and gold represents the creation of energy in the release of natural forces. By invoking this symbolism, the color scheme represents the Nation's commitment to meet its energy needs in a manner consistent with the preservation of the natural environment.

§ 1002.12 Use of replicas, reproductions, and embossing seals.

(a) The Secretary and his designees are authorized to affix replicas, reproductions, and embossing seals to appropriate documents, certifications, and other material for all purposes as authorized by this section.

(b) Replicas may be used only for:

(1) Display in or adjacent to DOE facilities, in Department auditoriums, presentation rooms, hearing rooms, lobbies, and public document rooms.

(2) Offices of senior officials.

(3) Official DOE distinguishing flags, adopted and utilized pursuant to subpart C.

(4) Official awards, certificates, medals, and plaques.

(5) Motion picture film, video tape and other audiovisual media prepared by or for DOE and attributed thereto.

(6) Official prestige publications which represent the achievements or mission of DOE.

(7) Non-DOE facilities in connection with events and displays sponsored by DOE, and public appearances of the Secretary or other designated senior DOE Officials.

(8) For other such purposes as determined by the Director of the Office of Administrative Services.

(c) Reproductions may be used only on:

(1) DOE letterhead stationery.

(2) Official DOE identification cards and security credentials.

(3) Business cards for DOE employees.

(4) Official DOE signs.

(5) Official publications or graphics issued by and attributed to DOE, or joint statements of DOE with one or more Federal agencies, State or local governments, or foreign governments.

(6) Official awards, certificates, and medals.

(7) Motion picture film, video tape, and other audiovisual media prepared by or for DOE and attributed thereto.

(8) For other such purposes as determined by the Director of the Office of Administrative Services.

(d) Embossing seals may be used only on:

(1) DOE legal documents, including interagency or intergovernmental agreements, agreements with States, foreign patent applications, and similar documents.

(2) For other such purposes as determined by the General Counsel or the Director of Administration.

(e) Any person who uses the official seal, replicas, reproductions, or embossing seals in a manner inconsistent with this part shall be subject to the provisions of 18 U.S.C. 1017, providing penalties for the wrongful use of an official seal, and to other provisions of law as applicable.

(f) The official seal is being registered with the World Intellectual Property Organization through the U.S. Patent and Trademark Office.

Subpart C Distinguishing Flag

§ 1002.21 Description of distinguishing flag.

(a) The base or field of the flag shall be white, and a replica of the official seal shall appear on both sides thereof.

(b)(1) The indoor flag shall be of rayon banner, measure 4′4″ on hoist by 5′6″ on the fly, exclusive of heading and hems, and be fringed on three edges with yellow rayon fringe, 2 1/2″ wide.

(2) The outdoor flag shall be of heavy weight nylon, and measure either 3′ on the hoist by 5′ on the fly or 5′ on the hoist by 8′ on the fly, exclusive of heading and hems.

(c) Each flag shall be manufactured in accordance with U.S. Department of Defense Military Specification Mil-F-2692. The official seal shall be screen printed on both sides, and on each side, the lettering shall read from left to right. Headings shall be Type II in accordance with the Institute of Heraldry Drawing No. 5-1-45E.

§ 1002.22 Use of distinguishing flag.

(a) DOE distinguishing flags may be used only:

(1) In the offices of the Secretarial officers, Chairman of the Federal Energy Regulatory Commission, and heads of field locations designated below:

Power Administrations. Regional Offices. Operations Offices. Certain Field Offices and other locations as designated by the Director of Administration.

(2) At official DOE ceremonies.

(3) In Department auditoriums, official presentation rooms, hearing rooms, lobbies, public document rooms, and in non-DOE facilities in connection with events or displays sponsored by DOE, and public appearances of DOE officials.

(4) On or in front of DOE installation buildings.

(5) Other such purposes as determined by the Director of Administration.

Subpart D Unauthorized Uses

§ 1002.31 Unauthorized uses of the seal and flag.

The official seal and distinguishing flag shall not be used except as authorized by the Director of Administration in connection with:

(a) Contractor-operated facilities.

(b) Souvenir or novelty items.

(c) Toys or commercial gifts or premiums.

(d) Letterhead design, except on official Departmental stationery.

(e) Matchbook covers, calendars, and similar items.

(f) Civilian clothing or equipment.

(g) Any article which may disparage the seal or flag or reflect unfavorably upon DOE.

(h) Any manner which implies Departmental endorsement of commercial products or services, or of the user's policies or activities.

PART 1003 OFFICE OF HEARINGS AND APPEALS PROCEDURAL REGULATIONS

Authority: 15 U.S.C. 761 et seq.; 42 U.S.C. 7101 et seq.

Source: 84 FR 58008, Oct. 30, 2019, unless otherwise noted.

§ 1003.1 Purpose and scope.

(a) This part establishes the procedures to be utilized in certain proceedings before the Office of Hearings and Appeals of the Department of Energy, where comprehensive procedures are not to be found in another part of DOE's regulations. These procedures provide standard rules of practice in a variety of informal adjudications when jurisdiction is vested in the Office of Hearings and Appeals, including requests for adjustments from DOE rules, regulations, and orders under the authority of 42 U.S.C. 7194 as well as other requests for relief with respect to final dispositions of DOE. Any or all of the procedures contained in this part may be adopted by reference in another DOE program, statute, rule, regulation, guidance, or DOE delegation of authority that invokes the adjudicatory authority of the Office of Hearings and Appeals. These rules do not apply to proceedings governed by a federal statute or DOE regulation that contains comprehensive procedures specifically applicable to proceedings conducted under the authority of that regulation. (e.g., 10 CFR part 708—DOE Contractor Employee Protection Program; 10 CFR part 710—Procedures for Determining Eligibility for Access to Classified Matter or Special Nuclear Material; 10 CFR part 1004—Freedom of Information Act (FOIA); 10 CFR part 712—Human Reliability Program.)

(b) Wherever another DOE program, statute, rule, regulation, guidance, or DOE delegation of authority references or adopts by reference the procedures set forth in a subpart contained in a previous iteration of this part, regardless of the subpart referenced, the procedures set forth in this part shall be deemed to apply.

§ 1003.2 Definitions.

(a) As used in this part:

Action means an affirmative act by DOE that carries the force of law.

Aggrieved, with respect to a person, means adversely affected by an action of the DOE.

Alternative Dispute Resolution means any technique for resolving disputes and managing conflict without resorting to litigation in either an administrative or judicial forum. Alternative Dispute Resolution techniques include, but are not limited to, mediation, facilitation, and shuttle diplomacy.

Decision and Order means the OHA's final decision on a petition brought under this part.

Director means the Director of the Office of Hearings and Appeals or duly authorized delegate.

DOE means the Department of Energy, created by the Department of Energy Organization Act (42 U.S.C. 7101 et seq.), and the National Nuclear Security Administration (NNSA).

Duly authorized representative means a person who has been designated to appear before the Office of Hearings and Appeals in connection with a proceeding on behalf of a person interested in or aggrieved by an action of the DOE. Such appearance may consist of the submission of a written document, a personal appearance, verbal communication, or any other participation in the proceeding.

Federal legal holiday means any calendar day designated as a federal holiday by federal statute or Executive order.

Final disposition of DOE means a DOE rule, order, or other action in any matter other than:

(i) A rulemaking;

(ii) An internal DOE order or directive issued by the Secretary of Energy or his delegate in the management and administration of departmental elements and functions; or

(iii) Any decision or order issued under 41 U.S.C. 4712 or under part 708, part 710, part 712, or part 1004 of this title.

OHA means the Office of Hearings and Appeals of the Department of Energy.

Participant means a non-party entity that submits a comment, briefing, or other filing in a proceeding.

Party means the petitioner and any adverse entity, which may include the DOE, which assumes the role of defendant or respondent in the proceeding.

Person means any individual, firm, estate, trust, sole proprietorship, partnership, association, company, joint-venture, corporation, governmental unit or instrumentality thereof, or a charitable, educational or other institution, and includes any officer, director, owner or duly authorized representative thereof.

Petition means a written submission to the OHA requesting that the OHA grant the petitioner relief.

Petitioner means any person filing a petition with the OHA.

Proceeding means the process and activity, and any part thereof, instituted by the OHA—either on its own initiative or in response to a petition submitted by a person—that may lead to an action by the OHA.

Verified email address means an email address that is publicly published or available upon request, or, if no such address exists, an email address through which the sender has communicated with the recipient in the previous 12 months.

(b) Throughout this part the use of a word or term in the singular includes the plural, and the use of the male pronoun is gender neutral.

§ 1003.3 Appearance before the OHA.

(a) An interested person may make an appearance, including a personal appearance at the discretion of the OHA, and participate in any proceeding described in this part on his own behalf or by a duly authorized representative. Any document filed by a duly authorized representative must contain a statement by such person certifying that he is a duly authorized representative.

(b) The OHA may deny, temporarily or permanently, in whole or in part, the privilege of participating in proceedings, including oral presentation, to any individual who is found by the OHA—

(1) To have made false or misleading statements, either orally or in writing;

(2) To have filed false or materially altered documents, affidavits or other writings;

(3) To lack the specific authority to represent the party or participant; or

(4) To have engaged in or to be engaged in conduct that substantially disrupts a proceeding.

§ 1003.4 Computation of time.

(a) Days. Except as provided in paragraph (b) of this section, in computing any period of time prescribed or allowed by these regulations or by an order of the OHA, the day of the act, event, or default from which the designated period of time begins to run is not to be included. The last day of the period so computed is to be included unless it is a Saturday, Sunday, or federal legal holiday, in which event the period runs until the end of the following day that is not a Saturday, Sunday, or a federal legal holiday. Documents received after 5 p.m., Eastern Time, are deemed filed on the following regular business day.

(b) Hours. If the period of time prescribed in an order issued by the OHA is stated in hours rather than days, the period of time begins to run upon actual notice of such order, whether by oral or written communication, to the person directly affected, and will run without interruption, unless otherwise provided in the order, or unless the order is stayed, modified, suspended, or rescinded. When a written order is transmitted by oral communication, the written order must be served as soon thereafter as is feasible.

(c) Additional time after service by mail. Whenever a person is required to perform an act, to cease and desist therefrom, or to initiate a proceeding under this part within a prescribed period of time after issuance to such person of an order, notice or other document and the order, notice, or other document is served solely by mail, 3 days will be added to the prescribed period.

§ 1003.5 Extension of time.

When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the OHA upon good cause shown.

§ 1003.6 Service.

(a) All documents required to be served under this part must be served personally, by first class United States mail, or by verified email address, except as otherwise provided.

(b) Service upon a person's duly authorized representative constitutes service upon that person.

(c) Official United States Postal Service receipts from certified mailing and email delivery receipts constitute evidence of service.

(d) The OHA may, at its discretion, allow for alternate forms of service when it determines that such would be advisable.

§ 1003.7 General filing requirements.

(a) Purpose and scope. The provisions of this section apply to all documents required or permitted to be filed with the OHA.

(b) Signing. Any document that is required to be signed, must be signed by the person filing the document. Any document filed by a duly authorized representative must contain a statement by such person certifying that he is a duly authorized representative. The signature by the filer constitutes a certificate by the signer that the signer has read the document and that to the best of the signer's knowledge, information, and belief formed after reasonable inquiry, the document is well grounded in fact, warranted under existing law, and submitted in good faith and not for any improper purpose such as to harass or to cause unnecessary delay. If a document is signed in violation of this section, the OHA may impose the sanctions specified in § 1003.3 and other sanctions determined to be appropriate.

(c) Labeling. A petition must be clearly labeled according to the nature of the action involved both on the petition itself and, where applicable, in the subject line of the email in which the petition is transmitted.

(d) Obligation to supply information. A person who files a petition is under a continuing obligation during the proceeding to provide the OHA with any new or newly discovered information that is relevant to that proceeding. Such information includes, but is not limited to, information regarding any other submission that is subsequently filed by that person with any DOE office.

(e) The same or related matters. A person who files a petition with the OHA must state whether, to the best knowledge of that person, the same or related action as that which is the subject of the petition has been or presently is being considered or investigated by any other DOE office, other federal agency, department, or instrumentality; or by a state or municipal agency or court; or by any law enforcement agency, including, but not limited to, a consideration or investigation in connection with any proceeding described in this part. In addition, the person must state whether contact has been made by the person or one acting on his behalf with any person who is employed by the DOE with regard to the same or a related issue, act, or transaction arising out of the same factual situation; the name of the person contacted; whether the contact was oral or in writing; the nature and substance of the contact; and the date or dates of the contact.

(f) Request for confidential treatment. (1) If any person filing a document with the OHA claims that some or all of the information contained in the document is exempt from the mandatory public disclosure requirements of the Freedom of Information Act (5 U.S.C. 552), is information referred to in 18 U.S.C. 1905, or is otherwise exempt by law from public disclosure, and if such person requests the OHA not to disclose such information, such person must file together with the document a copy of the document from which the information for which confidential treatment is being sought has been deleted. The person must indicate in the original document that it is confidential or contains confidential information and must file a statement specifying the justification for non-disclosure of the information for which confidential treatment is claimed. For example, if the person states that the information comes within the exception codified at 5 U.S.C. 552(b)(4) for trade secrets and commercial or financial information, such person shall include a statement specifying why such information is privileged or confidential. If the person filing a document does not submit a copy of the document with the confidential information deleted, the OHA may assume that there is no objection to public disclosure of the document in its entirety.

(2) The OHA will make a determination regarding any claim of confidentiality under criteria specified in 10 CFR 1004.11. Notice of the decision by the OHA to deny such claim, in whole or in part, and an opportunity to respond will be given to a person claiming confidentiality of information no less than five days prior to its public disclosure.

(g) Submitting multiple petitions. Each petition to the OHA must be submitted as a separate document, even if the petitions deal with the same or a related action or are submitted in connection with the same proceeding.

§ 1003.8 Effective date of orders.

Any order issued under this part is effective as against all persons having actual or constructive notice thereof upon issuance, in accordance with its terms, unless and until it is stayed or suspended. An order is deemed to be issued on the date, as specified in the order, on which it is signed by the Director, unless the order provides otherwise.

§ 1003.9 Method of submission of petitions, documents, and other materials.

Absent exceptional circumstances, all submissions to the OHA, as provided in this part or otherwise, must be filed electronically in accordance with the instructions set forth on the OHA website, found at https://www.energy.gov/oha/filing-information. The OHA may grant permission to file via mail or facsimile. Any submissions made in hard copy will not be returned.

§ 1003.10 Public reference room.

The OHA maintains an electronic public reference room at https://www.energy.gov/oha/decision-summaries. The following information is included:

(a) A list of all persons who have filed a petition and a digest of each petition;

(b) Each Decision and Order, with confidential information deleted, issued in response to a petition; and

(c) Any other information in the possession of the OHA which is required by statute to be made available for public inspection and copying, and any other information that the OHA determines should be made available to the public.

§ 1003.11 Filing a petition.

(a) Who may file. Any person may file a petition under this part who is aggrieved by a final disposition of DOE or who is so authorized by a program, statute, rule, regulation, guidance, or DOE delegation of authority.

(b) Form of petition. The person seeking relief under this part must file a petition. The general filing requirements in § 1003.7 apply in addition to the requirements stated in this part.

(c) Elements of a petition. Petitions to the OHA must include, as applicable:

(1) A full and complete statement of all relief requested from the OHA;

(2) A citation to the statute, regulation, delegation, or other authority pursuant to which the OHA has jurisdiction to consider the petition;

(3) A full and complete statement of all relevant facts pertaining to the action that is the subject of the petition and to the OHA relief sought;

(4) A statement of the factual and legal justification for the relief requested in the petition;

(5) A copy of all documents, including, but not limited to, contracts, financial records, communications, plans, analyses, and diagrams related to the petitioner's eligibility for the relief requested in the petition; and,

(6) A motion for stay, if a stay is sought by the petitioner. The OHA may grant a motion for stay filed after the petition only upon a showing of good cause.

(d) Service certification. The petitioner must submit to the OHA a certification that the petitioner has served the notice required pursuant to § 1003.12 of this part. The OHA must receive the certification within 15 days of the date on which the OHA received the petition. The OHA may grant an extension of time only upon a showing of good cause. The certification must include the names, addresses, telephone numbers, and email addresses of all potentially aggrieved persons or a statement that such information, in whole or in part, is not reasonably ascertainable.

(e) Where to file. A petition must be filed with the OHA in the manner specified in § 1003.9.

§ 1003.12 Notice.

(a) The petitioner must serve a copy of the petition and any subsequent amendments or other documents relating to the petition, or a copy from which confidential information has been deleted in accordance with § 1003.7(f), to each person who is reasonably ascertainable by the petitioner as a person who would be aggrieved by the OHA relief sought. The copy of the petition must be accompanied by a statement that the person may submit comments regarding the petition to the OHA within 10 days. The OHA may, in its discretion, extend the comment period. The petitioner must file a service certification with the OHA, in accordance with § 1003.11(d), stating that the requirements of this paragraph have been complied with and must include the names, addresses, and verified email addresses of each person to whom a copy of the petition was sent. The OHA may require the petitioner to provide additional or alternative notice, may identify additional persons on whom an applicant must serve notice, or may determine that notice should be published in the Federal Register.

(b) Notwithstanding the provisions of paragraph (a) of this section, if the petitioner determines that compliance with paragraph (a) of this section would be impracticable, the petitioner must:

(1) Comply with the requirements of paragraph (a) of this section with regard to those persons whom it is reasonable and practicable to notify; and

(2) Include with the certification a description of the persons or class or classes of persons to whom notice was not sent, as well as a brief explanation of why notice to each person or class of person was impracticable.

(c) Any person submitting written comments to the OHA regarding a petition filed under this part must serve a copy of the comments, or a copy from which confidential information has been deleted in accordance with § 1003.7(f), to the petitioner. The person must certify to the OHA that he has complied with the requirements of this paragraph. The OHA may notify other persons participating in the proceeding of such comments and provide an opportunity for such persons to respond.

§ 1003.13 [Reserved]

§ 1003.14 Evaluation of petitions.

(a) The OHA will acknowledge receipt of all petitions filed pursuant to this part.

(b) The OHA may request information of a petitioner, including, but not limited to, financial documents, responses to interrogatories, copies of communications, and such other information the OHA determines may inform its evaluation of the petition.

(1) The OHA will provide a petitioner with a period of time within which to provide any information requested by the OHA pursuant to this paragraph and instructions on how to deliver the information to the OHA.

(2) The OHA may extend the period of time for a petitioner to provide information requested by the OHA upon a showing of good cause by the petitioner. Such extensions will generally be for a period of no more than 30 days, and in no case will the OHA grant an extension that would result in the undue delay of its evaluation of a petition.

(c) In evaluating a petition, the OHA may consider relevant information from any source, including information received from a third party, provided that the petitioner is afforded an opportunity to respond to all third-party submissions.

(d) The OHA will complete its evaluation of a petition within 180 days of receipt of the petition. However, the Director may extend the period for the OHA's review for good cause, the reasoning for which must be set forth in the order extending the review period.

(e) In its evaluations, the OHA will use as a guide, but will not be bound by, the Federal Rules of Civil Procedure and Federal Rules of Evidence.

(f) The Director has all of the judicial powers necessary to conduct the proceeding, including, but not limited to, grants or denials of motions and entry of interlocutory orders.

(g) The OHA may conduct a hearing with regard to the petition if, in its discretion, it considers that such hearing will materially advance the proceeding. In deciding whether to conduct a hearing, the OHA may consider various factors, including, but not limited to, the number of persons potentially aggrieved by a petition, the extent to which witness testimony will assist the OHA in developing a complete factual record, and the estimated costs of conducting a hearing at a venue reasonably convenient to all parties.

§ 1003.15 Subpoenas, information requests, oaths, witnesses.

(a) In accordance with the provisions of this section and as otherwise authorized by law, the Director may sign, issue, and serve subpoenas; administer oaths and affirmations; take sworn testimony; compel attendance of and sequester witnesses; control dissemination of any record of testimony taken pursuant to this section; and subpoena and reproduce books, papers, correspondence, memoranda, contracts, agreements, or other relevant records or tangible evidence including, but not limited to, information retained in computerized or other automated systems in the possession of the subpoenaed person.

(b) The OHA may issue an information request requiring any person subject to the jurisdiction of the OHA to file a report providing information relating to the OHA proceeding, including, but not limited to, written answers to specific questions. The information request may be in addition to any other reports required.

(c) The Director, for good cause shown, may extend the time prescribed for compliance with the subpoena or information request and determine the terms of satisfactory compliance.

(d) Prior to the time specified for compliance, but within 10 days after the date of service of the subpoena or information request, the person upon whom the document was served may file a request for review of the subpoena or information request with the Director. The Director then will provide notice of receipt to the person requesting review, may extend the time prescribed for compliance with the subpoena or information request, and may determine the terms of satisfactory compliance.

(e) If the subpoena or information request is not modified or rescinded within 10 days of the date of the Director's notice of receipt:

(1) The subpoena or information request will be effective as issued; and

(2) The person upon whom the document was served must comply with the subpoena or information request within 20 days of the date of the Director's notice of receipt, unless otherwise notified in writing by the Director.

(f) A subpoena or information request must be served upon a person named in the document.

(g) If any person upon whom a subpoena or information request is served pursuant to this section refuses or fails to comply with any provision of the subpoena or information request, a proceeding may be commenced in the appropriate United States District Court to enforce the subpoena or information request.

(h) Documents produced in response to a subpoena must be accompanied by the sworn certification, under penalty of perjury, of the person to whom the subpoena was directed or his authorized agent that:

(1) A diligent search has been made for each document responsive to the subpoena; and

(2) To the best of his knowledge, information, and belief each document responsive to the subpoena is being produced.

(i) Any information furnished in response to an information request must be accompanied by the sworn certification, under penalty of perjury, of the person to whom it was directed or his authorized agent who actually provides the information that:

(1) A diligent effort has been made to provide all information required by the information request; and

(2) All information furnished is true, complete, and correct.

(j) If any document responsive to a subpoena is not produced or any information required by an information request is not furnished, the certification must include a statement setting forth every reason for failing to comply with the subpoena or information request. If a person to whom a subpoena or information request is directed withholds any document or information because of a claim of attorney-client or other privilege, the person submitting the certification required by paragraph (h) or (i) of this section must also submit a written list of the documents or the information withheld indicating a description of each document or piece of information, the date of the document, each person shown on the document as having received a copy of the document, each person shown on the document as having prepared or been sent the document, the privilege relied upon as the basis for withholding the document or information, and an identification of the person whose privilege is being asserted.

(k) If testimony is taken pursuant to a subpoena, the Director will determine whether the testimony will be recorded and the means by which the testimony is recorded.

(l) A witness whose testimony is recorded may procure a copy of his testimony by making a written request for a copy and paying the appropriate fees.

(m) The Director may sequester any person subpoenaed to furnish documents or give testimony. Unless permitted by the Director, neither a witness nor his attorney is permitted to be present during the examination of any other witnesses.

(n) The Director may require testimony to be given under oath, regardless of the form of the testimony. The oath or affirmation will direct the witness's attention to 18 U.S.C. 1001 and 18 U.S.C. 1621.

(o) The Director may require submissions to the OHA to be accompanied by an oath or affirmation attesting to the truth and accuracy of the submission. The oath or affirmation will direct the submitter's attention to 18 U.S.C. 1001 and 18 U.S.C. 1621.

(p) A witness whose testimony is taken may be accompanied, represented and advised by his attorney as follows:

(1) Upon the initiative of the attorney or witness, the attorney may advise his client, in confidence, with respect to the question asked his client, and if the witness refuses to answer any question, the witness or his attorney is required to briefly state the legal grounds for such refusal; and

(2) If the witness claims a privilege to refuse to answer a question on the grounds of self-incrimination, the witness must assert the privilege personally.

(q) The Director will take all necessary steps to regulate the course of testimony and to avoid delay and prevent or restrain contemptuous or obstructionist conduct or language. The OHA may take steps as the circumstances warrant in regard to any instances where any person or attorney refuses to comply with directions or provisions of this section.

§ 1003.16 Dismissal of petitions.

The Director may issue a Decision and Order dismissing a petition at any time during the course of a proceeding. The Decision and Order shall state whether the dismissal is with prejudice or without prejudice. A Decision and order Dismissing a petition may be the subject of a motion for reconsideration in accordance with § 1003.19 of this part.

(a) Dismissal with prejudice. The dismissal of a petition with prejudice by the OHA terminates the OHA's review of the petition and bars the petitioner from submitting any future petition concerning the same, or substantially the same, issues as those in the petition. The OHA may dismiss a petition with prejudice if:

(1) The OHA lacks jurisdiction to consider the petition;

(2) The petitioner has already received a Decision and Order from the Director in response to a previously filed petition that addresses the same issue;

(3) The petitioner provides a false statement under oath or files a false instrument with the OHA, as determined by the OHA;

(4) The petitioner refuses to comply with an order issued by the OHA;

(5) The petition is untimely;

(6) The issues raised in the petition are moot;

(7) The petitioner repeatedly fails to comply with procedural requirements; or,

(8) The same or a substantially similar petition was previously dismissed by the OHA without prejudice, and the same basis for dismissal without prejudice exists upon refiling by the same petitioner.

(b) Dismissal without prejudice. The dismissal of a petition without prejudice by the OHA terminates the OHA's review of the petition but does not bar the petitioner from resubmitting the petition provided that the facts or circumstances leading to the dismissal have been resolved. In dismissing a petition without prejudice, the OHA may order that the petitioner may not resubmit the petition, or a substantially similar petition, for a period of time not to exceed 180 days. The OHA may dismiss a petition without prejudice if:

(1) The petitioner fails to include any of the required elements of a petition set forth in § 1003.11 of this part;

(2) The petitioner fails to provide notice as required by § 1003.12 of this part;

(3) The petitioner fails to timely provide documents or information at the request of the OHA pursuant to § 1003.14 or § 1003.15 of this part;

(4) The petition fails to state a claim upon which the OHA can grant relief; or

(5) The OHA determines that there is insufficient information upon which to base a decision.

§ 1003.17 Standard of review.

(a) The OHA will grant a petition that seeks an adjustment from a DOE rule, regulation or order under the authority of 42 U.S.C. 7194 only if it determines that doing so will alleviate or prevent serious hardship, gross inequity or unfair distribution of burdens.

(b) Except as provided by program, statute, rule, regulation, or DOE delegation of authority, the OHA will grant any other petition filed under this part upon a showing that the DOE acted arbitrarily, capriciously, or in violation of a law, rule, regulation, or delegation with respect to the final disposition of DOE that is the subject of the petition.

(c) Petitions shall be decided in a manner that is, to the extent possible, consistent with the disposition of previous petitions of the same kind.

§ 1003.18 Decision and Order.

(a) Upon consideration of the petition and other relevant information received or obtained during the proceeding, the OHA will issue a Decision and Order granting or denying the petition and ordering relief as appropriate. The OHA will serve the Decision and Order on the parties to the proceeding and make it available to the public.

(b) The Decision and Order will set forth its legal basis and the relevant facts, state whether it is a final agency action of the DOE, and state what further review, if any, is available.

(c) There is no administrative appeal of a Decision and Order, except as provided by federal statute.

§ 1003.19 Reconsideration.

A participant in the proceeding may submit to the OHA a motion for reconsideration of a Decision and Order. The motion for reconsideration must be filed by the 20th day after the OHA makes the Decision and Order available to the public. The motion must include a statement of the grounds on which the movant believes reconsideration is warranted. Such grounds may include, but are not limited to, procedural, legal, or factual errors in the Decision and Order. A motion for reconsideration may be granted if the Director determines the Decision and Order contains an error that materially impacted the outcome of the proceeding.

PART 1004 FREEDOM OF INFORMATION ACT (FOIA)

Authority: 5 U.S.C. 552; 16 U.S.C. 824o-1.

Source: 53 FR 15661, May 3, 1988, unless otherwise noted.

§ 1004.1 Purpose and scope.

This part contains the regulations of the Department of Energy (DOE) that implement Freedom of Information (FOIA) 5 U.S.C. 552, Public Law 89-487, as amended by Public Law 93-502, 88 Stat. 1561, by Public Law 94-409, 90 Stat. 1241, by Public Law 99-570, 100 Stat. 3207-49, by Public Law 104-231, 110 Stat. 3048, by Public Law 110-175, 121 Stat. 2524, Public Law 111-83 § 564, 123 Stat. 2142, 2184, and by Public Law 114-185, 130 Stat. 538. The regulations of this part provide information concerning the procedures by which records may be requested from all DOE offices, excluding the Federal Energy Regulatory Commission (FERC). Records of DOE made available pursuant to the requirements of 5 U.S.C. 552 shall be furnished to members of the public as prescribed by this part. Persons seeking information or records of DOE may find it helpful to consult with a DOE FOIA Officer before invoking the formal procedures set out below. To the extent permitted by other laws, DOE will make records available which it is authorized to withhold under 5 U.S.C. 552 whenever it determines that such disclosure is in the public interest.

[81 FR 94918, Dec. 27, 2016]

§ 1004.2 Definitions.

As used in this part:

(a) Appeal Authority means the Office of Hearings and Appeals.

(b) Authorizing or Denying Official means that DOE officer having custody of or responsibility for records requested under 5 U.S.C. 552. In DOE Headquarters, the term refers to The Freedom of Information Act Officer and officials who report directly to either the Office of the Secretary or a Secretarial Officer as defined. In the field offices, the term refers to the head of a field location identified in paragraph (h) of this section and the heads of field offices to which they provide administrative support and have delegated this authority. In the National Nuclear Security Administration (NNSA), the term refers to the official appointed at such location as identified in paragraph (h)(8) of this section.

(c) ‘Commercial use’ request refers to a request from or on behalf of one who seeks information for a use or purpose that furthers the commercial, trade, or profit interests of the requester or the person on whose behalf the request is made. In determining whether a requester properly belongs in this category, agencies must determine how the requester will use the documents requested. Moreover, where DOE has reasonable cause to doubt the use to which a requester will put the records sought, or where that use is not evident from the request itself, the DOE will seek additional clarification before assigning the request to a specific category.

(d) Department or Department of Energy (DOE) means all organizational entities which are a part of the executive department created by Title II of the DOE Organization Act, Pub L. 95-91. This specifically excludes the FERC.

(e) Direct costs means those expenditures which the DOE actually incurs in searching for and duplicating (and in the case of commercial requesters, reviewing) documents to respond to a FOIA request. Direct costs include, for example, the salary of the employee performing the work (the basic rate of pay for the employee plus 16 percent of that rate to cover benefits) and the cost of operating duplicating machinery. Not included in direct costs are overhead expenses such as costs of space, and heating or lighting the facility in which the records are stored.

(f) Duplication refers to the process of making a copy of a document necessary to respond to a FOIA request. Such copies can take the form of, but are not limited to, paper copy, microform, audiovisual materials, or machine readable documentation (e.g., magnetic tape or disk). The copy provided must be in a form that can be reasonably used by requesters.

(g) Educational institution refers to a preschool, a public or private elementary or secondary school, an institution of graduate higher education, an institution of undergraduate higher education, an institution of professional education, and an institution of vocational education, which operates a program or programs of scholarly research.

(h) Freedom of Information Act (FOIA) Officer means the person designated to administer the Freedom of Information Act at the following DOE offices:

(1) Bonneville Power Administration, P.O. Box 3621CHI-7, Portland, OR 97208-3621.

(2) Carlsbad Field Office, P.O. Box 3090, Carlsbad, NM 88221.

(3) Chicago Office, 9800 S. Cass Avenue, Argonne, IL 60439.

(4) Environmental Management Consolidated Business Center, 250 East 5th Street, Suite 500, Cincinnati, OH 45202.

(5) Golden Field Office, 15013 Denver West Parkway, Mail Stop RSF DOE Golden, CO 80401.

(6) Headquarters, Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585.

(7) Idaho Operations Office, 1955 Fremont Avenue, MS 1203, Idaho Falls, ID 83401.

(8) National Nuclear Security Administration Albuquerque Complex, P.O. Box 5400, Albuquerque, NM 87185.

(9) National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940.

(10) Naval Reactors Laboratory Field Office, P.O. Box 109, West Mifflin, PA 15122-0109.

(11) Oak Ridge Office, P.O. Box 2001, Oak Ridge, TN 37831.

(12) Office of Naval Reactors, Headquarters, 1240 Isaac Hull Avenue SE., Washington Navy Yard, DC 20376-0822.

(13) Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37830.

(14) Richland Operations Office, P.O. Box 550, Mail Stop A7-75, Richland, WA 99352.

(15) Savannah River Operations Office, P.O. Box A, Aiken, SC 29801.

(16) Southeastern Power Administration, 1166 Athens Tech Road, Elberton, GA 30635-6711.

(17) Southwestern Power Administration, One West Third, S1200, Tulsa, OK 74103.

(18) Strategic Petroleum Reserve Project Management Office, 900 Commerce Road East-MS FE-455, New Orleans, LA 70123.

(19) Western Area Power Administration, 12155 W. Alameda Parkway, P.O. Box 281213, Lakewood, CO 80228-8213.

(i) General Counsel means the General Counsel provided for in section 202(e) of the DOE Organization Act, or any DOE attorney designated by the General Counsel as having responsibility for counseling the Department on Freedom of Information Act matters. In the NNSA, the term refers to the NNSA General Counsel, or any attorney designated by the NNSA General Counsel for counseling the NNSA on Freedom of Information Act matters, as provided for in section 3217 of the National Nuclear Security Administration Act, 50 U.S.C. 2407, Pub. L. 106-65. The NNSA General Counsel is not a Secretarial Officer.

(j) Headquarters means all DOE facilities functioning within the Washington metropolitan area except the Office of Naval Reactors.

(k) Non-commercial scientific institution refers to an institution that is not operated on a “commercial” basis as that term is referenced in § 1004.2(c), and which is operated solely for the purpose of conducting scientific research, the results of which are not intended to promote any particular product or industry.

(l) Office means any administrative or operating unit of the DOE, including those in field offices.

(m) Representative of the news media refers to any person or entity that gathers information of potential interest to a segment of the public, uses its editorial skills to turn the raw materials into a distinct work, and distributes that work to an audience. The term “news” means information that is about current events or that would be of current interest to the public. Examples of news-media entities are television or radio stations broadcasting to the public at large and publishers of periodicals (but only if such entities qualify as disseminators of “news”) who make their products available for purchase by or subscription by or free distribution to the general public. These examples are not all-inclusive. Moreover, as methods of news delivery evolve (for example, the adoption of the electronic dissemination of newspapers through telecommunications services), such alternative media shall be considered to be news-media entities. A freelance journalist shall be regarded as working for a news-media entity if the journalist can demonstrate a solid basis for expecting publication through that entity, whether or not the journalist is actually employed by the entity. A publication contract would present a solid basis for such an expectation; DOE may also consider the past publication record of the requester in making such a determination.

(n) Review refers to the process of examining documents located in response to a commercial use request (see paragraph (c) of this section) to determine whether any portion of any document located is permitted to be withheld. It also includes processing any documents for disclosure, e.g., doing all that is necessary to excise them and otherwise prepare them for release. Review does not include time spent resolving general legal or policy issues regarding the application of exemptions.

(o) Search includes all time spent looking for material that is responsive to a request, including page-by-page or line-by-line identification of material within documents. The DOE will search for material in the most efficient and least expensive manner in order to minimize cost for both DOE and the requester. For example, DOE will not engage in line-by-line search when merely duplicating an entire document would prove the less expensive and quicker method of complying with a request. “Search” will be distinguished, moreover, from “review” of material in order to determine whether the material is exempt from disclosure. Searches may be done manually or by computer using existing programming.

(p) Secretarial Officer means the Under Secretary; Under Secretary for Science; Administrator, Energy Information Administration; Administrator, National Nuclear Security Administration; Assistant Secretary for Congressional and Intergovernmental Affairs; Assistant Secretary for Energy Efficiency and Renewable Energy; Assistant Secretary for Environmental Management; Assistant Secretary for Fossil Energy; Assistant Secretary for Policy and International Affairs; Assistant Secretary for Nuclear Energy; Chief Financial Officer; Chief Health, Safety and Security Officer; Chief Human Capital Officer; Chief Information Officer; Director, Advanced Research Projects Agency—Energy,Director, Office of Indian Energy Policy and Programs, and Director, Loan Programs Office, Director, Office of Economic Impact and Diversity; Director, Office of Electricity Delivery and Energy Reliability; Director, Office of Hearings and Appeals; Director, Office of Legacy Management; Director, Office of Management; Director, Office of Public Affairs; Director, Office of Science; General Counsel; Inspector General; and Senior Intelligence Officer.

(q) Statute specifically providing for setting the level of fees for particular types of records, at 5 U.S.C. 552(a)(4)(A)(vi), means any statute that specifically requires a government agency, such as the Government Printing Office (GPO) or the National Technical Information Service (NTIS), to set the level of fees for particular types of records, in order to:

(1) Serve both the general public and private sector organizations by conveniently making available government information;

(2) Ensure that groups and individuals pay the cost of publications and other services which are for their special use so that these costs are not borne by the general taxpaying public;

(3) Operate an information dissemination activity on a self-sustaining basis to the maximum extent possible; or

(4) Return revenue to the Treasury for defraying, wholly or in part, appropriated funds used to pay the cost of disseminating government information.

[53 FR 15661, May 3, 1988, as amended at 71 FR 68734, Nov. 28, 2006; 79 FR 22857, Apr. 25, 2014; 81 FR 94919, Dec. 27, 2016]

§ 1004.3 Public inspection in an electronic format and policy on contractor records.

(a) DOE will maintain, for public inspection in an electronic format, the materials which are required by 5 U.S.C. 552(a)(2) to be made available for public inspection and copying. An electronic public reading room can be accessed via www.energy.gov and nnsa.energy.gov.

(b) Contractor records. (1) When a contract with DOE provides that any records acquired or generated by the contractor in its performance of the contract shall be the property of the Government, DOE will make available to the public such records that are in the possession of the Government or the contractor, unless the records are exempt from public disclosure under 5 U.S.C. 552(b).

(2) Notwithstanding paragraph (b)(1) of this section, records owned by the Government under contract that contain information or technical data having commercial value as defined in paragraph (b)(4) of this section or information for which the contractor claims a privilege recognized under Federal or State law shall be made available only when they are in the possession of the Government and not otherwise exempt under 5 U.S.C. 552(b).

(3) The policies stated in this paragraph:

(i) Do not affect or alter contractors' obligations to provide to DOE upon request any records that DOE owns under contract, or DOE's rights under contract to obtain any contractor records and to determine their disposition, including public dissemination; and

(ii) Will be applied by DOE to maximize public disclosure of records that pertain to concerns about the environment, public health or safety, or employee grievances.

(4) For purposes of paragraph (b)(2) of this section, “technical data and information having commercial value” means technical data and related commercial or financial information which is generated or acquired by a contractor and possessed by that contractor, and whose disclosure the contractor certifies to DOE would cause competitive harm to the commercial value or use of the information or data.

[53 FR 15661, May 3, 1988, as amended at 59 FR 63884, Dec. 12, 1994; 79 FR 22858, Apr. 25, 2014; 81 FR 94919, Dec. 27, 2016]

§ 1004.4 Elements of a request.

(a) Addressed to the FOIA Officer. A request for a record of DOE which is not available for public inspection in an electronic format, as described in § 1004.3, shall be: Addressed to the Headquarters or appropriate field FOIA Officer at DOE at a location listed in § 1004.2(h), and both the envelope and the letter shall be clearly marked “Freedom of Information Act Request;” or submitted via facsimile or electronically, on an appropriate agency Web site. Except as provided in paragraph (e) of this section, a request will be considered to be received by DOE for purposes of 5 U.S.C. 552(a)(6) and the 20-day response period will start upon actual receipt by the appropriate FOIA Officer, or not later than ten days after receipt by a designated FOIA Officer at any location in § 1004.2(h). Requests delivered after regular business hours are considered received on the next regular business day.

(b) Request must be in writing and for reasonably described records. A request for access to records must be submitted in writing and must reasonably describe the records requested to enable DOE personnel to locate them with a reasonable amount of effort. Where possible, specific information regarding dates, titles, file designations, and other information which may help identify the records should be supplied by the requester, including the names and titles of any DOE officers or employees who have been contacted regarding the request prior to the submission of a written request. If the request relates to a matter in pending litigation, the court and its location should be identified to aid in locating the documents. If the records are known to be in a particular office of the DOE, the request should identify that office.

(c) Categorical requests. (1) Must meet reasonably described records requirement. A request for all records falling within a reasonably specific and well-defined category shall be regarded as conforming to the statutory requirement that records be reasonably described if DOE personnel can reasonably determine which particular records are sought in the request. The request must enable the DOE to identify and locate the records sought by a process that is not unreasonably burdensome or disruptive of DOE operations. The FOIA Officer may take into consideration problems of search which are associated with the files of an individual office within the Department and determine that a request is not one for reasonably described documents as it pertains to that office.

(2) Assistance in reformulating a non-conforming request. If a request does not reasonably describe the records sought, as specified in paragraph (c)(1) of this section, the DOE response will specify the reasons why the request failed to meet the requirements of paragraph (c)(1) of this section and will invite the requester to confer with knowledgeable DOE personnel in an attempt to restate the request or reduce the request to manageable proportions by reformulation or by agreeing on an orderly procedure for the production of the records. If DOE responds that additional information is needed from the requester to render records reasonably described, any reformulated request submitted by the requester will be treated as an initial request for purposes of calculating the time for DOE response.

(d) Nonexistent records. (1) 5 U.S.C. 552 does not require the compilation or creation of a record for the purpose of satisfying a request for records.

(2) 5 U.S.C. 552 does not require the DOE to honor a request for a record not yet in existence, even where such a document may be expected to come into existence at a later time.

(3) If a requested record is known to have been destroyed or otherwise disposed of, or if no such record is known to exist, the requester will be so notified.

(e) Assurance of willingness to pay fees. A request shall include (1) an assurance to pay whatever fees will be assessed in accordance with § 1004.9, (2) an assurance to pay those fees not exceeding some specified dollar amount, or (3) a request for a waiver or reduction of fees. No request will be deemed to have been received until the DOE has received some valid assurance of willingness to bear fees anticipated to be associated with the processing of the request or a specific request of a waiver or reduction of fees.

(f) Requests for records or information of other agencies. Some of the records in the files of the DOE have been obtained from other Federal agencies or contain information obtained from other Federal agencies.

(1) Where a document originated in another Federal agency, the Authorizing Official will refer the request to the originating agency and so inform the requester, unless the originator agrees to direct release by DOE.

(2) Requests for DOE records containing information received from another agency, or records prepared jointly by DOE and other agencies, will be treated as requests for DOE records except that the Authorizing Official will coordinate with the appropriate official of the other agency. The notice of determination to the requester, in the event part or all of the record is recommended for denial by the other agency, will cite the other agency Denying Official as well as the appropriate DOE Denying Official if a denial by DOE is also involved.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, Apr. 25, 2014; 81 FR 94919, Dec. 27, 2016]

§ 1004.5 Processing requests for records.

(a) FOIA Officers will be responsible for processing requests for records submitted pursuant to this part. Upon receiving such a request, the FOIA Officer will, except as provided in paragraph (c) of this section, ascertain which Authorizing Official has responsibility for, custody of, or concern with the records requested. The FOIA Officer will review the request, consulting with the Authorizing Official where appropriate, to determine its compliance with § 1004.4. Where a request complies with § 1004.4, the FOIA Officer will acknowledge receipt of the request to the requester and forward the request to the Authorizing Official for action.

(b) The Authorizing Official will promptly identify and review the records encompassed by the request. The Authorizing Official or FOIA Officer will prepare a written response—

(1) Granting the request;

(2) Denying the request;

(3) Granting/denying it in part;

(4) Replying with a response stating that the request has been referred to another agency under § 1004.4(f) or § 1004.6(e); or

(5) Informing the requester that responsive records cannot be located or do not exist. The written response shall also notify the requester of the right to seek dispute resolution services from the DOE FOIA Public Liaison(s) or the Office of Government Information Services.

(c) Where a request involves records that are in the custody of or are the concern of more than one Authorizing Official, the FOIA Officer will identify all concerned Authorizing Officials that can reasonably be expected to have custody of the requested records. Upon identification of the appropriate Authorizing Officials, the FOIA Officer will forward them a copy of the request and a request for action. The Authorizing Officials will prepare a DOE response to the requester consistent with paragraph (b) of this section. The response will identify the Authorizing Official having responsibility for the determination to release or deny records.

(d) Time for processing requests. (1) Action pursuant to paragraph (b) of this section will be taken within 20 days of a request for DOE records being received (“received” is defined in § 1004.4(a)), except that,

(i) One request can be made to the requester for information and the DOE can toll the 20-day response period while it waits for the requester's response;

(ii) If necessary to clarify with the requester issues regarding fee assessment and the DOE can toll the 20-day response period; or

(iii) If unusual circumstances require an extension of time before a decision on a request can be reached and the person requesting records is promptly informed in writing by the Authorizing Official or FOIA Officer of the reasons for such extension and the date on which a determination is expected to be dispatched, then the Authorizing Official or FOIA Officer may take an extension not to exceed ten days. In cases where the Authorizing Official determines that unusual circumstances exist, the requester shall be notified in writing of the right to seek dispute resolution services from the DOE FOIA Public Liaison(s) or the Office of Government Information Services.

(2) For purposes of this section and § 1004.8(d), the term “unusual circumstances” may include but is not limited to the following:

(i) The need to search for and collect the requested records from field facilities or other establishments that are separate from the offices processing the request;

(ii) The need to search for, collect and appropriately examine a voluminous amount of separate and distinct records which are responsive to a single request; or

(iii) The need for consultation, which shall be conducted with all practicable speed, with another agency having a substantial interest in the determination of the request, or among two or more components of the Department having substantial subject matter interest therein.

(3) The requester must be promptly notified in writing of the extension, the reasons for the extension, and the date on which a determination is expected to be made.

(4) If no determination has been made at the end of the 20-day period, or the last extension thereof, the requester may deem his administrative remedies to have been exhausted, giving rise to a right of review in a district court of the United States as specified in 5 U.S.C. 552(a)(4). When no determination can be made within the applicable time limit, the responsible Authorizing Official or FOIA Officer will nevertheless continue to process the request. If DOE is unable to provide a response within the statutory period, the Authorizing Official or FOIA Officer will inform the requester of the reason for the delay; the date on which a determination may be expected to be made; and the requester's right to seek remedy through the courts, but will ask the requester to forego such action until a determination is made.

(5) Nothing in this part shall preclude the Authorizing Official or FOIA Officer and a requester from agreeing to an extension of time for the initial determination on a request. Any such agreement will be confirmed in writing and will clearly specify the total time agreed upon.

(6) Expedited processing. Generally, the DOE will respond to requests in the order of receipt. Requests will be processed out of order and processed as soon as practicable when it is determined, based upon information supplied by the requester or otherwise known to the DOE, that a compelling need exists to provide the records in an expeditious manner. The FOIA states that a compelling need exists when failure to obtain records expeditiously could reasonably be expected to pose a threat to the life or physical safety of an individual or, when a request is submitted by a person primarily engaged in disseminating information and there is an urgency to inform the public about actual or alleged Federal Government activity.

(7) A determination to grant or deny a request for expedited processing will be made by the appropriate FOIA Officer within ten days after receipt of the request. The requester will be notified of the determination and informed that any denial may be appealed within 90 calendar days to the Office of Hearings and Appeals.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, Apr. 25, 2014; 81 FR 94920, Dec. 27, 2016]

§ 1004.6 Requests for classified records.

(a) All requests for classified records will be subject to the provisions of this part with the special qualifications noted below.

(b) All requests for records made in accordance with this part, except those requests for access to classified records which are made specifically pursuant to the mandatory review provisions of Executive Order 13526 and § 1045 or any successor thereto, may be automatically considered a FOIA Act request.

(c) Concurrence of the Director of Classification is required on all responses involving the denial of classified information. The Director of Classification will be informed of the request by either the FOIA Officer or the Authorizing Official to whom the action is assigned, and will advise the office originating the records, or having responsibility for the records, and consult with such office or offices prior to making a determination under this section.

(d) The written notice of a determination to deny records, or portions of records, which contain both classified material and other exempt material, will be concurred in by the Director of Classification who will be the Denying Official for the classified portion of such records in accordance with §§ 1004.5(c) and 1004.7(b)(2). If other DOE officials or appropriate officials of other agencies are responsible for denying any portion of the record, their names and titles or positions will be listed in the notice of denial in accordance with §§ 1004.5(c) and 1004.7(b)(2) and it will be clearly indicated what portion or portions they were responsible for denying.

(e) Requests for DOE records containing classified information received from another agency, and requests for classified documents originating in another agency, will be coordinated with or referred to the other agency consistent with the provisions of § 1004.4(f). Coordination or referral of information or documents subject to this section will be effected by the Director of Classification (in consultation with the Authorizing Official) with the appropriate official of the other agency.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, Apr. 25, 2014]

§ 1004.7 Responses by authorizing officials: Form and content.

(a) Form of grant. Records requested pursuant to § 1004.4 will be made available promptly, when they are identified and determined to be nonexempt under this Regulation, the FOIA, and where the applicable fees are $15 or less or where it has been determined that the payment of applicable fees should be waived. Where the applicable fees exceed $15, the records may be made available before all charges are paid.

(b) Form of denial. A reply denying a request for a record will be in writing. It will be signed by a FOIA Officer or the Denying Official pursuant to § 1004.5 (b) or (c) and will include:

(1) Reason for denial. A statement of the reason for denial, containing a reference to the specific exemption under the FOIA authorizing the withholding of the record and a brief explanation of how the exemption applies to the record withheld, and a statement of why a discretionary release is not appropriate. The amount of information deleted and the applicable exemption will be indicated on the released portion of the record, unless the indication would harm an interest protected by the exemption.

(2) Persons responsible for denial. A statement setting forth the name and the title or position of each Denying Official and identifying the portion of the denial for which each Denying Official is responsible.

(3) Segregation of nonexempt material. A statement or notation addressing the issue of whether there is any segregable nonexempt material in the documents or portions thereof identified as being denied.

(4) Adequacy of search. Although a determination that no such record is known to exist is not a denial, the requester will be informed that a challenge may be made to the adequacy of the search by appealing within 90 calendar days to the Office of Hearings and Appeals.

(5) Administrative appeal. A statement that the determination to deny documents made within the statutory time period may be appealed within 90 calendar days to the Office of Hearings and Appeals.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, Apr. 25, 2014; 81 FR 94920, Dec. 27, 2016]

§ 1004.8 Appeal of initial denials.

(a) Appeal to Office of Hearings and Appeals. When the Authorizing or Denying Official or FOIA Officer has denied a request for records in whole or in part or has responded that there are no documents responsive to the request consistent with § 1004.4(d), or when the FOIA Officer has denied a request for expedited processing consistent with § 1004.5(d) or for waiver of fees consistent with § 1004.9, the requester may, within 90 calendar days of its receipt, appeal the determination to the Office of Hearings and Appeals.

(b) Elements of appeal. The appeal must be in writing, addressed to the Director, Office of Hearings and Appeals, Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-1615 and both the envelope and letter must be clearly marked “Freedom of Information Act Appeal.” The appeal may be delivered by U.S Mail, commercial delivery service, or by electronic mail to OHA.Filings@hq.doe.gov. The appeal must contain a concise statement of the grounds upon which it is brought and a description of the relief sought. It should also include a discussion of all relevant authorities, including, but not limited to, DOE (and predecessor agencies) rulings, regulations, interpretations and decisions on appeals, and any judicial determinations being relied upon to support the appeal. A copy of the letter containing the determination which is being appealed must be submitted with the appeal. The appeal should also provide a telephone number, electronic mail address, or other means for communicating with the requester during business hours.

(c) Receipt of appeal. An appeal will be considered to be received for purposes of 5 U.S.C. 552(a)(6) upon receipt by the Appeal Authority. Documents delivered after the regular business hours of the Office of Hearings and Appeals are considered received on the next regular business day.

(d) Action within 20 days. (1) The Appeal Authority will act upon the appeal within 20 days of its receipt, except that if unusual circumstances (as defined in § 1004.5(d)(2)) require an extension of time before a decision on a request can be reached, the Appeal Authority may extend the time for final action for an additional ten days less the number of days of any statutory extension which may have been taken by the Authorizing Official during the period of initial determination.

(2) The requester must be promptly notified in writing of the extension, setting forth the reasons for the extension, and the date on which a determination is expected to be issued. Notification will be sent by electronic mail, when possible, or by letter.

(3) If no determination on the appeal has been issued at the end of the 20-day period or the last extension thereof, the requester may consider his administrative remedies to be exhausted and seek a review in a district court of the United States as specified in 5 U.S.C. 552(a)(4). When no determination can be issued within the applicable time limit, the appeal will nevertheless continue to be processed; on expiration of the time limit the requester will be informed of the reason for the delay, of the date on which a determination may be expected to be issued, and of his right to seek judicial review in the United States district court in the district in which he resides or has his principal place of business, the district in which the records are situated, or the District of Columbia. The requester may be asked to forego judicial review until determination of the appeal.

(4) Nothing in this part will preclude the Appeal Authority and a requester from agreeing to an extension of time for the decision on an appeal. Any such agreement will be confirmed in writing by the Appeal Authority and will clearly specify the total time agreed upon for the appeal decision.

(e) Form of action on appeal. The Appeal Authority's action on an appeal will be in writing and will set forth the reason for the decision. It will also contain a statement that it constitutes final agency action on the request and that judicial review will be available either in the district in which the requester resides or has a principal place of business, the district in which the records are situated, or in the District of Columbia. Documents determined by the Appeal Authority to be documents subject to release will be made promptly available to the requester upon payment of any applicable fees.

(f) Classified records and records covered by section 148 of the Atomic Energy Act. The Secretary of Energy or his or her designee will make the final determination concerning appeals involving the denial of requests for classified information or the denial of requests for information falling within the scope of section 148 of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2168).

(g) Appeal of the denial of expedited processing. Any appeal of the determination to deny a request for expedited processing will be acted on expeditiously.”

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, Apr. 25, 2014; 81 FR 94920, Dec. 27, 2016]

§ 1004.9 Fees for providing records.

(a) Fees to be charged. DOE may charge fees that recoup the full allowable direct costs incurred. DOE will use the most efficient and least costly methods to comply with requests for documents made under FOIA. DOE may contract with private sector services to locate, reproduce and disseminate records in response to FOIA requests when that is the most efficient and least costly method. When doing so, however, DOE will ensure that the ultimate cost to the requester is no greater than it would be if DOE itself had performed these tasks. In no case will DOE contract out responsibilities which FOIA provides that only the agency may discharge, such as determining the applicability of an exemption, or determining whether to waive or reduce fees, which are determinations by Authorizing Officials or FOIA Officers. Where DOE can identify documents that are responsive to a request and are maintained for public distribution by other agencies such as the National Technical Information Service and the Government Publishing Office, the FOIA Officer will inform requesters of the procedures to obtain records from those sources.

(1) Manual searches for records. Whenever feasible, the DOE will charge for manual searches for records at the salary rate(s) (i.e. basic pay plus 16 percent) of the employee(s) making the search.

(2) Computer searches for records. DOE will charge at the actual direct cost of providing the service.

(3) Review of records. The DOE will charge requesters who are seeking documents for commercial use for time spent reviewing records to determine whether they are exempt from mandatory disclosure. Charges will be assessed only for the initial review (i.e., the review undertaken the first time the DOE analyzes the applicability of a specific exemption to a particular record or portion of a record. The DOE will not charge for review at the administrative appeal level of an exemption already applied. However, records or portions of records withheld in full under an exemption which is subsequently determined not to apply may be reviewed again to determine the applicability of other exemptions not previously considered. The costs for such a subsequent review would be properly assessable.

(4) Duplication of records. The DOE will make a per-page charge for paper copy reproduction of documents. At present, the charge for paper to paper copies will be ten cents per page and the charge for microform to paper copies will be ten cents per page. For computer generated copies, such as tapes or printouts, the DOE will charge the actual cost, including operator time, for production of the tape or printout. For other methods of reproduction or duplication, we will charge the actual direct costs of producing the document(s).

(5) Other charges. It shall be noted that complying with requests for special services such as those listed below is entirely at the discretion of this agency. Neither the FOIA nor its fee structure cover these kinds of services. The DOE will recover the full direct costs of providing services such as those enumerated below to the extent that we elect to provide them:

(i) Certifying that records are true copies;

(ii) Sending records by special methods such as express mail, etc.

(6) Restrictions on assessing fees. (i) With the exception of requesters seeking documents for a commercial use pursuant to 5 U.S.C. 552(a)(4)(A)(iv), DOE will provide the first 100 pages of duplication and the first two hours of search time without charge. Moreover, DOE will not charge fees to any requester, including commercial use requesters, if the cost of collecting the fee would be equal to or greater than the fee itself. These provisions work together, so that except for commercial use requesters, DOE will not begin to assess fees until after the Department has provided the free search and reproduction. For example, if a request involves two hours and ten minutes of search time and results in 105 pages of documents, DOE will charge for only ten minutes of search time and only five pages of reproduction. If this cost is equal to or less than $15.00, the amount DOE incurs to process a fee collection, no charges would be assessed. For purposes of these restrictions on assessment of fees, the word “pages” refers to paper copies of a standard agency size which will be normally be “8 1/2 × 11” or “11 × 14.” Thus, requesters would not be entitled to 100 microfiche or 100 computer disks, for example. A microfiche containing the equivalent of 100 pages or 100 pages of computer printout, however, might meet the terms of the restriction. Similarly, the term “search time” is based on a manual or electronic search. To apply this term, DOE will calculate the hourly rates of the subject matter expert and/or FOIA analysts conducting the search plus 16 percent.

(ii) When unusual or exceptional circumstances do not apply and time limits specified in FOIA are not met, DOE will not charge any search fees, or duplication fees for educational and non-commercial scientific institution requesters and requesters who are representatives of the news media.

(iii) Except as provided in paragraph (a)(6)(iv) of this section, DOE will not assess any search fees (or in the case of a requester who is an educational or noncommercial scientific institution, whose purpose is scholarly or scientific research; or a representative of the news media, duplication fees) under this paragraph (a)(6)(iii) if DOE has failed to comply with any time limit under § 1004.5(d).

(iv)(A) If DOE has determined that unusual circumstances apply (as the term is defined in § 1004.5(d)(2)) and DOE provided a timely written notice to the requester in accordance with § 1004.5(d)(1)(iii), a failure described in paragraph (a)(6)(iii) of this section is excused for an additional 10 days. If DOE fails to comply with the extended time limit, DOE may not assess any search fees (or in the case of a requester described under paragraph (a)(6)(iii) of this section, duplication fees).

(B) If DOE has determined that unusual circumstances (as that term is defined in § 1004.5(d)(2)) apply and more than 5,000 pages are necessary to respond to the request, DOE may charge search fees (or in the case of a requester described under paragraph (a)(6)(iii) of this section, duplication fees) if DOE has provided a timely written notice to the requester in accordance with § 1004.5(d)(1)(iii) and DOE has discussed with the requester via written mail, electronic mail, or telephone (or made not less than three good-faith attempts to do so) how the requester could effectively limit the scope of the request in accordance with 5 U.S.C. 552(a)(6)(B)(ii).

(C) If a court has determined that unusual circumstances exist (as that term is defined in § 1004.5(d)(2)), a failure described in paragraph (a)(6)(iv) of this of this section shall be excused for the length of time provided by the court order.

(7) Notification of charges. If the DOE determines or estimates that the fees to be assessed under this section may amount to more than $25.00, the requester will be informed of the estimated amount of fees, unless the requester has previously indicated a willingness to pay the amount estimated by the agency. In cases where a requester has been notified that actual or estimated fees may amount to more than $25.00, the request will be deemed not to have been received until the requester has agreed to pay the anticipated total fee. A notice to a requester pursuant to this paragraph will offer the opportunity to confer with DOE personnel in order to reformulate the request to meet his or her needs at a lower cost.

(8) Waiving or reducing fees. DOE will furnish documents without charge or at reduced charges if disclosure of the information is in the public interest because it is likely to contribute significantly to public understanding of the operations or activities of the government and disclosure is not primarily in the commercial interest of the requester. This fee waiver standard thus sets forth two basic requirements, both of which must be satisfied before fees will be waived or reduced. First it must be established that disclosure of the requested information is in the public interest because it is likely to contribute significantly to public understanding of the operations or activities of the government. Second, it must be established that disclosure of the information is not primarily in the commercial interest of the requester. When these requirements are satisfied, based upon information supplied by a requester or otherwise made known to DOE, the waiver or reduction of a FOIA fee will be granted. In determining when fees should be waived or reduced the appropriate FOIA Officer should address the following two criteria:

(i) That disclosure of the information “is in the public interest because it is likely to contribute significantly to public understanding of the operations or activities of the government.” Factors to be considered in applying this criteria include but are not limited to:

(A) The subject of the request: Whether the subject of the requested records concerns “the operations or activities of the government”;

(B) The informative value of the information to be disclosed: Whether the disclosure is “likely to contribute” to an understanding of government operations or activities;

(C) The contribution to an understanding by the general public of the subject likely to result from disclosure; and

(D) The significance of the contribution to public understanding: Whether the disclosure is likely to contribute “significantly” to public understanding of government operations or activities.

(ii) If disclosure of the information “is not primarily in the commercial interest of the requester.” Factors to be considered in applying this criteria include but are not limited to:

(A) The existence and magnitude of a commercial interest: Whether the requester has a commercial interest that would be furthered by the requested disclosure; and, if so

(B) The primary interest in disclosure: Whether the magnitude of the identified commercial interest of the requester is sufficiently large, in comparison with the public interest in disclosure, that disclosure is “primarily in the commercial interest of the requester.”

(b) Fees to be charged—categories of requesters. There are four categories of FOIA requesters: Commercial use requesters; educational and non-commercial scientific institutions; representatives of the news media; and all other requesters. The FOIA Officers will make determinations regarding categories of requesters as defined at § 1004.2. The Headquarters FOIA Officers will assist field FOIA Officers in categorizing requesters, and will resolve conflicting categorizations. FOIA prescribes specific levels of fees for each of these categories:

(1) Commercial use requesters. When DOE receives a request for documents which appears to be for commercial use, charges will be assessed to recover the full direct costs of searching for, reviewing for release, and duplicating the records sought. Commercial use requesters are not entitled to two hours of free search time nor 100 free pages of reproduction of documents. DOE will recover the cost of searching for and reviewing records even if there is ultimately no disclosure of records.

(2) Educational and non-commercial scientific institution requesters. The DOE will provide documents to requesters in this category for the cost of reproduction only, excluding charges for the first 100 pages. To be eligible for inclusion in this category, requesters must show that the request is being made as authorized by and under the auspices of a qualifying institution and that the records are not sought for a commercial use, but are sought in furtherance of scholarly (if the request is from an educational institution) or scientific (if the request is from a non-commercial scientific institution) research.

(3) Requesters who are representatives of the news media. The DOE will provide documents to requesters in this category for the cost of reproduction only, excluding charges for the first 100 pages. To be eligible for inclusion in this category, a requester must meet the criteria in § 1004.2(m), and his or her request must not be made for a commercial use. With respect to this class of requesters, a request for records supporting the news dissemination function of the requester will not be considered to be a request for a commercial use.

(4) All other requesters. The DOE will charge requesters who do not fall into any of the above categories fees which recover the full reasonable direct cost of searching for and reproducing records that are responsive to the request, except that the first 100 pages of reproduction and the first two hours of search time will be furnished without charge. Moreover, requests from individuals for records about themselves filed in DOE systems of records will continue to be processed under the fee provisions of the Privacy Act of 1974.

(5) Charging interest—notice and rate. Interest will be charged to those requesters who fail to pay fees. DOE will begin to assess interest charges on the amount billed on the 31st calendar day following the day on which the billing was sent to the requester. Interest will be at the rate prescribed in section 3717 of Title 31 U.S.C. and will accrue from the date of the billing.

(6) Charges for unsuccessful search. DOE may assess charges for time spent searching even if the search fails to identify responsive records or if records located are determined to be exempt from disclosure. If DOE estimates that search charges are likely to exceed $25, it will notify the requester of the estimated amount of fees, unless the requester has indicated in advance his willingness to pay fees as high as those anticipated. Such a notice will offer the requester the opportunity to confer with agency personnel in order to reformulate the request to reduce the cost of the request.

(7) Aggregating requests. A requester may not file multiple requests each seeking portions of a document or documents, solely to avoid payment of fees. When the DOE reasonably believes that a requester or, a group of requesters acting in concert, is attempting to break a request down into a series of requests for the purpose of evading the assessment of fees, the DOE will aggregate any such requests and charge the appropriate fees. The DOE may consider the time period in which the requests have been made in its determination to aggregate the related requests. In no case will DOE aggregate multiple requests on unrelated subjects from one requester.

(8) Advance payments. Requesters are not required to make an advance payment (i.e., payment before action is commenced or continued on a request) unless:

(i) The DOE estimates or determines that allowable charges that a requester may be required to pay are likely to exceed $250.00. In such cases, the DOE will notify the requester of the likely cost and obtain a satisfactory assurance of full payment where the requester has a history of prompt payment of FOIA fees, or require an advance payment of an amount up to the full estimated charges in the case of requesters with no history of payment.

(ii)(A) A requester has previously failed to pay a fee in a timely fashion (i.e., within 30 calendar days of the date of the billing). DOE will require the requester to pay the full amount delinquent plus any applicable interest as provided in paragraph (b)(5) of this section, or demonstrate that he or she has, in fact, paid the delinquent fee; and to make an advance payment of the full amount of the estimated current fee before we begin to process a new request or a pending request from that requester.

(B) When DOE acts under paragraphs (b)(8) (i) or (ii) of this section, the administrative time limits prescribed in section (a)(6) of FOIA (i.e., 20 days from receipt of initial requests and 20 days from receipt of appeals from initial denials, plus permissible extensions of these time limits) will begin only after DOE has received fee payments described.

(c) Effect of the Debt Collection Act of 1982 (Pub. L. 97-365). The DOE will use the authorities of the Debt Collection Act, including disclosure to consumer reporting agencies and the use of collection agencies, where appropriate, to encourage payment of fees.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, 22859, Apr. 25, 2014; 81 FR 94921, Dec. 27, 2016]

§ 1004.10 Exemptions.

(a) 5 U.S.C. 552 exempts from all of its publication and disclosure requirements nine categories of records which are described in paragraph (b) of that section. These categories include such matters as national defense and foreign policy information; investigatory records; internal procedures and communications; materials exempted from disclosure by other statutes; confidential, commercial, and financial information; and matters involving personal privacy.

(b) Specifically, the exemptions in 5 U.S.C. 552(b) will be applied consistent with § 1004.1 of these regulations to matters that are:

(1) Specifically authorized under criteria established by an Executive Order to be kept secret in the interest of the national defense or foreign policy and are in fact properly classified pursuant to such Executive Order;

(2) Related solely to the internal personnel rules and practices of an agency;

(3) Specifically exempted from disclosure by statute (other than 5 U.S.C. 552(b)), provided that such statute-

(i) Requires that the matters be withheld from the public in such a manner as to leave no discretion on the issue;

(ii) Establishes particular criteria for withholding or refers to particular types of matters to be withheld; for example Restricted Data and Formerly Restricted Data under the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.) are covered by this exemption; or

(iii) If enacted after the date of enactment of the OPEN FOIA Act of 2009, specifically cites to Exemption 3 of the FOIA, 5 U.S.C. 552(b)(3).

(4) Trade secrets and commercial or financial information obtained from a person and privileged or confidential;

(5) Inter-agency or intra-agency memoranda or letters that would not be available by law to a party other than an agency in litigation with the agency, provided that the deliberative process privilege shall not apply to records created 25 years or more before the date on which the records were requested;

(6) Personnel and medical files and similar files the disclosure of which would constitute a clearly unwarranted invasion of personal privacy;

(7) Records or information compiled for law enforcement purposes, but only to the extent that the production of such law enforcement records or information (i) could reasonably be expected to interfere with enforcement proceedings, (ii) would deprive a person of a right to a fair trial or an impartial adjudication, (iii) could reasonably be expected to constitute an unwarranted invasion of personal privacy, (iv) could reasonably be expected to disclose the identity of a confidential source, including a State, local, or foreign agency or authority or any private institution which furnished information on a confidential basis, and, in the case of a record or information compiled by a criminal law enforcement authority in the course of a criminal investigation or by an agency conducting a lawful national security intelligence investigation, information furnished by a confidential source, (v) would disclose techniques and procedures for law enforcement investigations or prosecutions, or would disclose guidelines for law enforcement investigations or prosecutions if such disclosure could reasonably be expected to risk circumvention of the law, or (vi) could reasonably be expected to endanger the life or physical safety of any individual;

(8) Contained in or related to examination, operating, or condition reports prepared by, on behalf of, or for the use of an agency responsible for the regulation or supervision of financial institutions; or

(9) Geological and geophysical information and data, including maps, concerning wells.

(c) DOE shall withhold information under this section only if—

(1) The agency reasonably foresees that disclosure would harm an interest protected by an exemption described in paragraph (b) of this section; or

(2) Disclosure is prohibited by law. DOE shall consider whether partial disclosure of information is possible whenever the agency determines that a full disclosure of a requested record is not possible and take reasonable steps necessary to segregate and release nonexempt information. Nothing in this paragraph requires disclosure of information that is otherwise prohibited from disclosure by law, or otherwise exempted from disclosure by paragraph (b)(3) of this section.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22859, Apr. 25, 2014; 81 FR 94922, Dec. 27, 2016]

§ 1004.11 Handling information of a private business, foreign government, or an international organization.

(a) Whenever a document submitted to DOE contains information which may be exempt from public disclosure, it will be handled in accordance with the procedures in this section. While DOE is responsible for making the final determination with regard to the disclosure or nondisclosure of information contained in requested documents, DOE will consider the submitter's views (as that term is defined in this section) in making its determination. Nothing in this section will preclude the submission of a submitter's views at the time of the submission of the document to which the views relate, or at any other time.

(b) When the DOE may determine, in the course of responding to a FOIA request, not to release information submitted to the DOE (as described in paragraph (a) of this section, and contained in a requested document) without seeking any or further submitter's views, no notice will be given the submitter.

(c) When the DOE, in the course of responding to a FOIA request, cannot make the determination described in paragraph (b) of this section without having for consideration the submitter's views, the submitter shall be promptly notified and provided an opportunity to submit his views on whether information contained in the requested document (1) is exempt from the mandatory public disclosure requirements of the FOIA Act, (2) contains information referred to in 18 U.S.C. 1905, or (3) is otherwise exempt by law from public disclosure. The DOE will make its own determinations as to whether any information is exempt from disclosure. Notice of a determination by the DOE that a claim of exemption made pursuant to this paragraph is being denied will be given to a person making such a claim no less than seven (7) calendar days prior to intended public disclosure of the information in question. For purposes of this section, notice is deemed to be given when mailed to the submitter at the submitter's last known address.

(d) When the DOE, in the course of responding to a FOIA request, cannot make the determination described in paragraph (b) of this section and, without recourse to paragraph (c) of this section, previously has received the submitter's views, the DOE will consider such submitter's views and will not be required to obtain additional submitter's views under the procedure described in paragraph (c) of this section. The DOE will make its own determination with regard to any claim that information be exempted from disclosure. Notice of the DOE's determination to deny a claim of exemption made pursuant to this paragraph will be given to a person making such a claim no less than seven (7) calendar days prior to its intended public disclosure.

(e) Notwithstanding any other provision of this section, DOE offices may require a person submitting documents containing information that may be exempt by law from mandatory disclosure to (1) submit copies of each document from which information claimed to be confidential has been deleted or (2) require that the submitter's views be otherwise made known at the time of the submission. Notice of a determination by the DOE that a claim of exemption is being denied will be given to a person making such a claim no less than seven (7) calendar days prior to intended public disclosure of the information in question. For purposes of this section, notice is deemed to be given when mailed to the submitter at the submitter's last known address.

(f) Criteria for determining the applicability of 5 U.S.C. 552(b)(4). Subject to subsequent decisions of the Appeal Authority, criteria to be applied in determining whether information is exempt from mandatory disclosure pursuant to Exemption 4 of the Freedom of Information Act include:

(1) Whether the information has been held in confidence by the person to whom it pertains;

(2) Whether the information is of a type customarily held in confidence by the person to whom it pertains and whether there is a reasonable basis therefore;

(3) Whether the information was transmitted to and received by the Department in confidence;

(4) Whether the information is available in public sources;

(5) Whether disclosure of the information is likely to impair the Government's ability to obtain similar information in the future; and

(6) Whether disclosure of the information is likely to cause substantial harm to the competitive position of the person from whom the information was obtained.

(g) When DOE, in the course of responding to a Freedom of Information Act request, determines that information exempt from the mandatory public disclosure requirements of the Freedom of Information Act is to be released in accordance with § 1004.1, DOE will notify the submitter of the intended discretionary release no less than seven (7) calendar days prior to the intended public disclosure of the information in question.

(h) As used in this section, the term submitter's views means, with regard to a document submitted to the DOE, an item-by-item indication, with accompanying explanation, addressing whether the submitter considers the information contained in the document to be exempt from the mandatory public disclosure requirements of the Freedom of Information Act, to be information referred to in 18 U.S.C. 1905, or to be otherwise exempt by law from mandatory public disclosure. The accompanying explanation shall specify the justification for nondisclosure of any information under consideration. If the submitter states that the information comes within the exemption in 5 U.S.C. 552(b)(4) for trade secrets and commercial or financial information, the submitter shall include a statement specifying why such information is privileged or confidential and, where appropriate, shall address the criteria in paragraph (f) of this section excluding paragraph (f)(5). In all cases, the submitter shall address the question of whether or not discretionary disclosure would be in the public interest.

[53 FR 15661, May 3, 1988, as amended at 79 FR 22858, 22859, Apr. 25, 2014; 81 FR 94922, Dec. 27, 2016]

§ 1004.12 Computation of time.

Except as otherwise noted, in computing any period of time prescribed or allowed by this part, the day of the event from which the designated period of time begins to run is not to be included; the last day of the period so computed is to be included; and Saturdays, Sundays, and legal holidays are excepted.

§ 1004.13 Critical electric infrastructure information.

(a) Filing Procedures and guidance. Information regarding critical electric infrastructure information (CEII) filing procedures and further guidance for submitters and requesters is available on the website of the United States Department of Energy's Office of Electricity at https://www.energy.gov/oe/office-electricity.

(b) Purpose and scope. This part sets forth the regulations of the Department of Energy (DOE) that implement section 215A(d) of the Federal Power Act (FPA), codified at 16 U.S.C. 824o-1(d). The regulations in this part set forth the DOE procedures for the designation, sharing, and protection of CEII. This section applies to anyone who provides CEII to DOE or who receives CEII from DOE, including DOE employees, DOE contractors, and agents of DOE or of other Federal agencies, as well as individuals or organizations providing CEII or submitting a request for CEII designation to DOE or who have requested or have been permitted access to CEII by DOE.

(c) Definitions—(1) Bulk-Power System means the facilities and control systems necessary for operating an interconnected electric energy transmission network (and any portion thereof), and electric energy from generation facilities needed to maintain transmission system reliability. The term does not include facilities used in the local distribution of electric energy.

(2) Confidential Business Information means commercial or financial information that is both customarily and actually treated as private by its owner and that is provided to the government as part of a claimed CEII submission.

(3) Critical Electric Infrastructure means a system or asset of the bulk-power system, whether physical or virtual, the incapacity or destruction of which would negatively affect national security, economic security, public health or safety, or any combination of such matters.

(4) Critical Electric Infrastructure Information (CEII) is defined at FPA section 215(a)(3), with designation criteria codified at 18 CFR 388.113(c). CEII means information related to critical electric infrastructure, or proposed critical electrical infrastructure, generated by or provided to FERC or another Federal agency, other than classified national security information, that is designated as CEII by FERC or the Secretary pursuant to section 215A(d) of the FPA. Such term includes information that qualifies as critical energy infrastructure information under FERC's regulations.

(5) CEII Coordinator means the Assistant Secretary or Principal Deputy Assistant Secretary of the DOE Office of Electricity, who shall coordinate and oversee the implementation of DOE's program for CEII-designation authority under section 215A of the FPA, assist all DOE Offices with respect to requests for CEII designation in determining whether particular information fits within the definition of CEII, and manage DOE's protection, storage, and sharing of CEII materials and oversight of the development of CEII international sharing protocols. The CEII Coordinator may delegate the daily implementation of the CEII Coordinator function as described in this rule, in whole or in part, to an appropriate DOE Office of Electricity official, to an Assistant Secretary in DOE, and to the Administrator of the Bonneville Power Administration, the Energy Information Administration, the Southeastern Power Administration, the Southwestern Power Administration, or the Western Area Power Administration (“Coordinator's designee”).

(6) Department means the United States Department of Energy.

(7) Department of Energy (DOE) means all organizational entities that are part of the Executive Department created by Title II of the DOE Organization Act (Pub. L. 95-91, 91 Stat. 565, 42 U.S.C. 7101 et seq.). For purposes of this Part, the definition of DOE specifically excludes the Federal Energy Regulatory Commission, which has promulgated its own CEII procedures at 18 CFR 388.113.

(8) DOE Office means any administrative or operating unit of DOE with authority at or above the level of Assistant Secretary, Principal Deputy Assistant Secretary, or Administrator.

(9) Secretary means the Secretary of Energy.

(d) Authority to designate information as CEII. The Secretary has the authority to designate information as CEII, in accordance with FPA section 215A. The Secretary may delegate the authority to designate information as CEII to any DOE Office.

(e) Coordination among DOE Office designators. The DOE CEII Coordinator shall be the primary point of contact for the submission of all requests for designation of information as CEII by DOE, as well as for requests made to DOE by organizations or individuals for information that may be protected, in whole or in part, as CEII.

(1) The CEII Coordinator or Coordinator's designee shall:

(i) Receive and review all incoming requests for CEII as defined in paragraph (c) of this section and in accordance with paragraph (g) of this section;

(ii) Make initial determinations as to whether particular information fits within the definition of CEII found in paragraph (c) of this section;

(iii) Assist any DOE Offices with delegated CEII designation authority to make determinations as to whether a particular requester's need for and ability and willingness to protect CEII warrants limited disclosure of the information to the requester;

(iv) Establish reasonable conditions for considering requests for release of CEII-designated material in accordance with paragraphs (g)(5) and (6) of this section;

(v) Make the Department's final determination regarding a request by any non-federal entity (organization or individual) for CEII-designated materials, in consultation with the appropriate DOE Office(s);

(vi) Notify a CEII submitter of a request for such information by a non-federal entity;

(vii) Convene a conference call between an affected DOE Office and a CEII submitter to discuss concerns related to a non-federal entity requesting release of CEII within no more than five (5) business days after the CEII submitter is notified of the request, providing the CEII submitter with a copy of the request prior to the conference call; and

(viii) Perform oversight of the DOE CEII program and establish guidance for the treatment, handling, and storage of all CEII materials in the Department in accordance with paragraph (g)(6) of this section, including those related to CEII international sharing protocols.

(2) DOE Offices with delegated authority to designate CEII in accordance with paragraph (d) of this section, as well as any CEII Coordinator designee(s), will meet regularly, at the discretion of the CEII Coordinator, but not less than once per year, to ensure coordinated implementation of DOE's CEII designation authority.

(3) DOE, at the discretion of the CEII Coordinator, shall meet with representatives from the Federal Energy Regulatory Commission semi-annually (or more often, as necessary) to ensure that both agencies are applying CEII designation criteria consistently and to share best practices.

(4) DOE, at the discretion of the CEII Coordinator, shall meet at least once per year with representatives from the Department of Commerce including the National Telecommunications and Information Administration, the Department of Homeland Security, the Nuclear Regulatory Commission, and other Federal agencies, as needed, to ensure shared understanding and consistent communication among Federal agencies that collect, maintain, and potentially release information that DOE may consider designating as CEII as defined in paragraph (c) of this section.

(f) CEII FOIA Exemption. All information designated by DOE as CEII is exempt from disclosure under the Freedom of Information Act, 5 U.S.C. 552(b)(3) and shall not be made available by any Federal, state, political subdivision, or tribal authority pursuant to any Federal, State, political subdivision, or tribal law requiring public disclosure of information or records pursuant to section 215A(d)(1)(A) and (B) of the Federal Power Act.

(g) Criteria and procedures for designating CEII—(1) Criteria. The CEII Coordinator or Coordinator's designee shall apply the definition of CEII as provided in paragraph (c) of this section, consistent with FPA section 215A(a)(3), and with designation criteria codified at 18 CFR 388.113(c), to information sought by DOE and to information submitted to DOE with a request for designation.

(2) Requesting CEII designation of information submitted to DOE. Any person or entity requesting that information submitted to DOE be designated as CEII must submit such request to the DOE CEII Coordinator or Coordinator's designee according to the following procedures:

(i) The submitter must clearly label the cover page and pages or portions of the information for which CEII treatment is requested in bold, capital lettering, indicating that it contains CEII, as appropriate, and marked “CEII—CRITICAL ELECTRIC INFRASTRUCTURE INFORMATION—DO NOT RELEASE.”

(ii) The submitter must clearly label the cover page and pages or portions of information that it considers Confidential Business Information in bold, capital lettering, indicating that it contains Confidential Business Information, as appropriate, and marked “CONFIDENTIAL BUSINESS INFORMATION—DO NOT RELEASE.” If combined with a CEII label, the information should be marked “CEII—CRITICAL ELECTRIC INFRASTRUCTURE INFORMATION and CONFIDENTIAL BUSINESS INFORMATION—DO NOT RELEASE.”

(iii) The submitter must also clearly indicate the DOE Office(s) from which the CEII designation is being requested in bold, capital lettering on the cover page.

(iv) The submitter must also segregate those portions of the information that contain CEII (or information that reasonably could be expected to lead to the disclosure of the CEII) wherever feasible.

(v) The submitter must also label and segregate information that it classifies as Confidential Business Information under the definition at paragraph (c)(2) of this section with the mark “CONFIDENTIAL BUSINESS INFORMATION—DO NOT RELEASE.” Under separate cover, the submitter may, but is not required to, submit a written justification of why the labeled information meets the definition at paragraph (c)(2) of this section.

(vi) The submitter must submit a public version of the information where information designated CEII and information for which CEII designation is requested is redacted or otherwise protected through extraction from the non-CEII to the DOE CEII Coordinator and the Coordinator's designee in an appropriate DOE Office, where feasible. If the entirety of submitted information is CEII, the submitter must indicate that, but no separate public version is required.

(3) Requesting CEII designation for information generated by DOE. Any DOE employees, DOE contractors, or agents of DOE requesting that information generated by the Department be designated as CEII must submit such request to the DOE CEII Coordinator or the Coordinator's designee in an appropriate DOE Office according to the following procedures:

(i) The submitter must clearly label the cover page and pages or portions of the information for which CEII treatment is requested in bold, capital lettering, indicating that it contains CEII, as appropriate, and marked “CEII—CRITICAL ELECTRIC INFRASTRUCTURE INFORMATION—DO NOT RELEASE.”

(ii) The submitter must also segregate those portions of the information that contain CEII (or information that reasonably could be expected to lead to the disclosure of the CEII) wherever feasible.

(iii) The submitter must submit a public version of the information where information designated CEII and information for which CEII designation is requested is redacted or otherwise protected through extraction from non-CEII.

(iv) CEII designation for information generated by DOE, to include all organizational entities that are a part of the Executive Department created by Title II of the DOE Organization Act, may be executed at any time, regardless of when such information was generated, where feasible.

(4) Treatment of Submitted Information. (i) Upon receiving a request for CEII designation of information submitted to DOE, the DOE CEII Coordinator or Coordinator's designee shall review the submission made in accordance with paragraph (g)(2) of this section.

(ii) Information for which CEII treatment is requested will be maintained by the CEII Coordinator or Coordinator's designee in DOE's files as non-public unless and until DOE completes its determination that the information is not entitled to CEII treatment. This approach does not mean that DOE has made a determination regarding CEII designation, and should under no circumstances be construed as such. DOE will endeavor to make a determination as soon as practicable. The Department retains the right to make determinations about any request for CEII designation at any time, including the removal of a previously granted CEII designation. At such time that a determination is made that information does not meet the CEII criteria, DOE will follow the procedures for return of information not designated as CEII outlined in paragraph (g)(6)(iii) of this section.

(iii) When a requester seeks information for which CEII status has been requested but not designated, or when DOE itself is considering release of such information, DOE will render a decision on designation before responding to the requester or releasing such information. Subsequently, the release of information will be treated in accordance with the procedures established for CEII-designated material, or the return of information not designated as CEII.

(5) Evaluation of CEII designation criteria to inform CEII designation determination. (i) The DOE CEII Coordinator, or a Coordinator's designee, will execute the Department's evaluation as to whether the submitted information or portions of the information meets the definition of CEII, as described at paragraph (c)(2) of this section, with the appropriate DOE Office with delegated CEII designation authority. The DOE Office will designate submitted information as soon as practicable and will inform submitters of the designation date if requested at the time of submission.

(ii) [Reserved]

(6) CEII Determination. (i) DOE CEII Coordinator makes CEII designation determination. The Secretary or delegated DOE Office will make a determination regarding CEII designation after considering the information against the criteria for CEII designation. The DOE CEII Coordinator or Coordinator's designee shall promptly communicate the decision of the Secretary or delegated DOE Office to the submitter.

(ii) Review of determination. DOE reserves the right to review at any time information designated by DOE as CEII to determine whether the information is properly designated. The designation of information as CEII, or the removal of such designation, must be reviewed when:

(A) A FOIA request is submitted for the information under § 1004.10; or

(B) A request is made for reconsideration of the designation or removal of the designation under paragraph (i)(1) of this section.

(iii) Return of Information not designated as CEII. Because the submitter voluntarily provided the information to DOE, at the request of the submitter, DOE will return or destroy information for which CEII designation was requested but not granted, and will attempt to remove all copies of such information from DOE files, both physical and electronic. DOE shall return or destroy non-CEII consistent with the Federal Records Act, and DOE handling of agency records in accordance with DOE Order O.243.1A, Records Management Program, and related requirements and responsibilities for implementing and maintaining an efficient and economic records management program in accordance with law and regulatory requirements. DOE shall not remove electronic files in the ordinary course of business. If a submitter is required to provide information and DOE denies CEII designation, the submitter may file a request for review under the procedures.

(7) Protection of CEII—(i) Marking of CEII. All information designated by DOE as CEII, whether submitted to or generated by DOE, shall be clearly labeled as such, and shall include the date on which the information was designated as CEII. For information that meets the definition of CEII but cannot be physically labeled, such as electronic information, the information shall be—

(A) Electronically marked with the words “CEII—CRITICAL ELECTRIC INFRASTRUCTURE INFORMATION—DO NOT RELEASE” in the electronic file name; or

(B) Transmitted under a Non-Disclosure Agreement or other agreements or arrangements, such as those identified in paragraph (j)(3) of this section, to an electronic system where such information is stored in a secure electronic environment that identifies the stored information as CEII.

(ii) Protection and Exemption from Disclosure. All information designated by DOE as CEII is exempt from FOIA and shall not be made available as provided in paragraph (f) of this section.

(iii) Secure Storage. DOE will store information for which CEII treatment is requested in a secure place in a manner that would prevent unauthorized access (e.g. locked room or file cabinet). Information submitted to DOE in electronic format shall be stored in a secure electronic environment that identifies the stored information as CEII.

(8) Protection of Confidential Business Information—Exemption Determination. DOE will evaluate information claimed as Confidential Business Information if, and at such time as, a valid FOIA request is submitted and the information is otherwise responsive to the request. DOE will conduct the evaluation pursuant to procedures set forth in this part. In its evaluation, DOE will consult any supplementary justification provided by the submitter as described at paragraph (f)(1)(iv) of this section.

(h) Duration of designation. Designation of information as CEII shall be a five-year period, unless removed or re-designated.

(1) Expiration of designation. (i) The Secretary or delegated DOE Office will determine the duration of designation at the time of designation.

(ii) A submitter may re-apply for CEII designation no earlier than one year prior to the date of expiration of the initial designation or re-designation in accordance with the application procedures in paragraph (g)(1) of this section.

(iii) The Secretary, the DOE CEII Coordinator, or a Coordinator's designee may initiate CEII designation at any time prior to the date of expiration of the initial designation or re-designation.

(2) Removal of designation. The designation of information as CEII may be removed at any time, by the Secretary or the DOE CEII Coordinator in consultation with the DOE Office to which the Secretary has delegated the authority, in whole or in part, upon determination that the unauthorized disclosure of such information could no longer be used to impair the security or reliability of the bulk-power system or distribution facilities or any other form of energy infrastructure. If the CEII designation is to be removed, the submitter and the DOE Office that produced or maintains the CEII will receive electronic notice stating that the CEII designation will be removed at least nine (9) business days before disclosure. In such notice, the DOE CEII Coordinator or Coordinator's designee will provide the submitter and the DOE Office that produced or maintains the CEII an opportunity (at least nine (9) business days) in which to comment in writing prior to the removal of the designation. The final determination will briefly explain DOE's determination.

(3) Treatment of information no longer designated as CEII. If a FOIA request is received for information for which CEII designation has expired or has been removed, DOE will work with the submitter to review whether the information is subject to other FOIA exemptions. DOE will destroy non-CEII consistent with the Federal Records Act, and DOE handling of agency records in accordance with DOE Order O.243.1A, Records Management Program, and related requirements and responsibilities for implementing and maintaining an efficient and economic records management program in accordance with law and regulatory requirements.

(i) Review or requests for reconsideration of designation—(1) Request for Reconsideration. (i) Any person who has submitted information and requested such information to be designated as CEII may request reconsideration of a DOE decision not to designate that information as CEII, or to remove an existing CEII designation, on grounds that the information does not meet the required CEII criteria. Within ten (10) business days of notification by DOE of its CEII decision, the person must file a request for reconsideration. The request must be sent to the DOE CEII Coordinator and Coordinator's designee through a secure electronic submission or by mail according to the instructions at 10 CFR 205.12. The request must also be sent to the DOE Office that made the decision at issue and to DOE's Office of General Counsel in Washington, DC, according to the instructions at 10 CFR 205.12. A statement in support of the request for reconsideration must be submitted within twenty (20) business days of the date of the determination. The request and the supporting statement will be considered submitted upon receipt by the Office of the General Counsel.

(ii) Any person who has received a decision denying a request for the release of CEII, in whole or in part, or a decision denying a request to change the designation of CEII, may request reconsideration of that decision. A statement in support of the request for reconsideration must be submitted to the DOE Office of the General Counsel within twenty (20) business days of the date of the determination.

(iii) The Secretary or the DOE Office that made the decision at issue will make a determination, in coordination with the DOE CEII Coordinator or Coordinator's designee, with respect to any request for reconsideration within twenty (20) business days after the receipt of the request and will notify the person submitting the request of the determination and the availability of judicial review.

(iv) Before seeking judicial review in Federal District Court under section 215A(d)(11) of the FPA, a person who received a determination from DOE concerning a CEII designation must first request reconsideration of that determination.

(v) A request for reconsideration triggers a stay of the underlying decision, except in instances where voluntary sharing of the disputed information is necessary for law enforcement purposes, to ensure reliable operation or maintenance of electric or energy infrastructure, to maintain infrastructure security, to address potential threats, or to address an urgent need to disseminate the information quickly due to an emergency or other unforeseen circumstance.

(j) Sharing of CEII—(1) Federal Entities. An employee of a Federal entity acting within the scope of his or her Federal employment may obtain CEII directly from DOE without following the procedures outlined in paragraph (k) of this section. DOE will evaluate requests by Federal entities for CEII on a programmatic, fact-specific basis. DOE may share CEII with affected agencies for those agencies to carry out their specific jurisdictional responsibilities, but it may impose additional restrictions on how the information may be used and maintained. To obtain access to CEII, an authorized agency employee must sign an acknowledgement and agreement that states the agency will protect the CEII in the same manner as the Department and will refer any requests for the information to the Department. Notice of each such request also must be given to the CEII Coordinator.

(2) Non-federal Entities. The Secretary or the CEII Coordinator shall make a final determination whether to share CEII materials requested by non-federal entities that are within the categories specified in section 215A(d)(2)(D) of the FPA. A request by such a non-federal entity shall not be entertained unless the requesting non-federal entity demonstrates that the release of information is in the national security interest and it has entered into a Non-Disclosure Agreement with DOE that ensures, at a minimum:

(i) Use of the information only for authorized purposes and by authorized recipients and under the conditions prescribed by the Secretary or CEII Coordinator;

(ii) Protection of the information in a secure manner to prevent unauthorized access;

(iii) Destruction or return of the information after the intended purposes of receiving the information have been fulfilled;

(iv) Prevention of viewing or access by individuals or organizations that have been prohibited or restricted by the United States or the Department from viewing or accessing CEII;

(v) Compliance with the provisions of the Non-Disclosure Agreement, subject to DOE audit;

(vi) No further sharing of the information without DOE's permission; and

(vii) CEII provided pursuant to the agreement is not subject to release under the Freedom of Information Act, 5 U.S.C. 552(b)(3), and shall not be made available by any Federal, state, political subdivision, or tribal authority pursuant to any Federal, State, political subdivision, or tribal law requiring public disclosure of information or records pursuant to sections 215A(d)(1)(A) and (B) of the Federal Power Act.

(viii) The Non-Disclosure Agreement must state that the agreement applies to all subsequent releases of CEII during the calendar year in which the DOE and the non-federal entity enter into the agreement. As a result, the non-federal entity will not be required to file a Non-Disclosure Agreement with subsequent requests during the calendar year.

(3) Security and Reliability Coordination. In accordance with section 215A(d)(2)(D) of the FPA, DOE may, taking into account standards of the Electric Reliability Organization, facilitate voluntary sharing of CEII with, between, and by Federal, State, political subdivision, and tribal authorities; the Electric Reliability Organization; regional entities; information sharing and analysis centers or information sharing and analysis organizations; reliability coordinators; balancing authorities; owners, operators, and users of critical electric infrastructure in the United States; and other entities determined appropriate. All entities receiving CEII must execute either a Non-Disclosure Agreement or an Acknowledgement and Agreement or participate in an Electric Reliability Organization or Regional Entity information sharing program that ensures the protection of CEII. A copy of each agreement or program will be maintained by the DOE Office with a copy to the CEII Coordinator or the Coordinator's designee. If DOE facilitates voluntary sharing of CEII under this subsection, DOE may impose additional restrictions on how the information may be used and maintained.

(4) International Sharing Protocols. The Secretary may delegate authority to DOE Offices to develop, after consultation with Canadian and Mexican authorities, protocols for the voluntary sharing of CEII with Canadian and Mexican authorities and owners, operators, and users of the bulk-power system outside the United States. The DOE CEII Coordinator or Coordinator's designee would provide assistance and advice to DOE Offices in the development of the international sharing protocols.

(5) Notice for Sharing of CEII not Generated by DOE. The DOE CEII Coordinator or Coordinator's designee will provide electronic notice to the CEII submitter no less than ten (10) business days before DOE releases CEII submitted to and not generated by DOE, except in instances where voluntary sharing is necessary for law enforcement purposes, to ensure reliable operation or maintenance of electric or energy infrastructure, to maintain infrastructure security, or to address potential threats; where there is an urgent need to quickly disseminate the information; or where prior notice is not practicable due to an emergency or other unforeseen circumstance. If prior notice is not given, DOE will provide notice as soon as practicable. The DOE CEII Coordinator or Coordinator's designee will convene a phone call within five (5) business days of electronic notice with the CEII submitter to discuss concerns about the proposed release of CEII-designated materials to the requester. DOE will make the final determination as to whether to share CEII not generated by DOE.

(k) Procedures for requesting CEII. DOE shall consider requests for CEII on a case-by-case basis. Any person requesting CEII must include the following material with the request:

(1) Contact Information. Provide your name, title and employer, work address, work phone number, and work email. If you are requesting the information on behalf of a person or entity other than yourself, you must also list that person's or entity's work contact information, including name, title, address, phone number, and email.

(2) Explanation of Need. Provide a detailed statement explaining the particular need for and intended use of the information. This statement must include:

(i) The extent to which a particular function is dependent upon access to the information;

(ii) Why the function cannot be achieved or performed without access to the information;

(iii) An explanation of whether other information is available to the requester that could facilitate the same objective;

(iv) How long the information will be needed;

(v) Whether or not the information is needed to participate in a specific proceeding (with that proceeding identified); and

(vi) An explanation of whether the information is needed expeditiously.

(3) Signed Non-Disclosure Acknowledgement/Agreement. Provide an executed Non-Disclosure Acknowledgement (if the requester is a Federal entity) or an executed Non-Disclosure Agreement (if the requester is not a Federal entity) requiring adherence to limitations on the use and disclosure of the information requested.

(4) DOE evaluation. Upon receiving a request for CEII, the CEII Coordinator shall contact the DOE Office or Federal agency that created or maintains the CEII. In consultation with the DOE Office, the CEII Coordinator shall carefully consider the statement of need provided by the requester and determine if the need for CEII and the protection afforded to the CEII should result in sharing CEII for the limited purpose identified in the request. If the CEII Coordinator or Coordinator's designee denies the request, the requestor may seek reconsideration, as provided in paragraph (i) of this section.

(l) Disclosure—(1) Disclosure by submitter of information. If the submitter of information deliberately discloses to the public information that has received a CEII designation, then the Department reserves the right to remove its CEII designation.

(2) Disciplinary Action for Unauthorized Disclosure. DOE employees or contractors who knowingly or willfully disclose CEII in an unauthorized manner will be subject to appropriate sanctions, including disciplinary action under DOE or DOE Office personnel rules or referral to the DOE Inspector General. Any action by a Federal or non-federal Entity who knowingly or willfully falsifies, conceals, or covers up by any trick, scheme, or device a material fact; makes any materially false, fictitious, or fraudulent statement or representation; or makes or uses any false writing or document knowing the same to contain any materially false, fictitious, or fraudulent statement or entry to obtain CEII may also constitute a violation of other applicable laws and is potentially punishable by fine and imprisonment.

(3) Whistleblower protection. In accordance with the Whistleblower Protection Enhancement Act of 2012 (Pub. L. 112-199, 126 Stat. 1465), the provisions of this rule are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created by existing statute relating to:

(i) Classified information;

(ii) Communications to Congress;

(iii) The reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement, a gross waste of funds, an abuse of authority, or a substantial and specific danger to public health or safety; or

(iv) Any other whistleblower protection. The definitions, requirements, obligations, rights, sanctions, and liabilities created by controlling statutory provisions are not affected by this rule.

[85 FR 14768, Mar. 16, 2020]

PART 1005 INTERGOVERNMENTAL REVIEW OF DEPARTMENT OF ENERGY PROGRAMS AND ACTIVITIES

Authority: E. O. 12372, July 14, 1982, 47 FR 30959, as amended April 8, 1983, 48 FR 15887; sec. 401 of the Intergovernmental Cooperation Act of 1968, as amended (31 U.S.C. 6506).

Source: 48 FR 29182, June 24, 1983, unless otherwise noted.

§ 1005.1 What is the purpose of these regulations?

(a) The regulations in this part implement Executive Order 12372, “Intergovernmental Review of Federal Programs,” issued July 14, 1982 and amended on April 8, 1983. These regulations also implement applicable provisions of section 401 of the Intergovernmental Cooperation Act of 1968.

(b) These regulations are intended to foster an intergovernmental partership and a strengthened Federalism by relying on state processes and on state, areawide, regional and local coordination for review of proposed federal financial assistance and direct federal development.

(c) These regulations are intended to aid the internal management of the Department, and are not intended to create any right or benefit enforceable at law by a party against the Department or its officers.

§ 1005.2 What definitions apply to these regulations?

Department means the U.S. Department of Energy.

Order means Executive Order 12372, issued July 14, 1982, and amended April 8, 1983 and titled “Intergovernmental Review of Federal Programs.”

Secretary means the Secretary of the U.S. Department of Energy or an official or employee of the Department acting for the Secretary under a delegation of authority.

State means any of the 50 states, the District of Columbia, the Commonwealth of Puerto Rico, the Commonwealth of the Northern Mariana Islands, Guam, American Samoa, the U.S. Virgin Islands, or the Trust Territory of the Pacific Islands.

§ 1005.3 What programs and activities of the Department are subject to these regulations?

(a) The Secretary publishes in the Federal Register a list of the Department's program and activities that are subject to the order and these regulations.

(b) Unless otherwise stated in the Federal Register listing identified in paragraph (a) of this section, these regulations do not apply to the Department's financial assistance transactions with other than governmental entities.

(c) The Bonneville Power Administration shall satisfy the requirements of these regulations by compliance with the consultation requirements of the Pacific Northwest Electric Power Planning and Conservation Act, Public Law 96-501.

§ 1005.4 What are the Secretary's general responsibilities under the Order?

(a) The Secretary provides opportunities for consultation by elected officials of those state and local governments that would provide the nonfederal funds, for, or that would be directly affected by, proposed federal financial assistance from, or direct federal development by, the Department.

(b) If a state adopts a process under the Order to review and coordinate proposed federal financial assistance and direct federal development, the Secretary, to the extent permitted by law:

(1) Uses the state process to determine official views of state and local elected officials;

(2) Communicates with state and local elected officials as early in a program planning cycle as is reasonably feasible to explain specific plans and actions;

(3) Make efforts to accommodate state and local elected official's concerns with proposed federal financial assistance and direct federal development that are communicated through the state process;

(4) Allows the states to simplify and consolidate existing federally required state plan submissions;

(5) Where state planning and budgeting systems are sufficient and where permitted by law, encourages the substitution of State plans for federally required state plans;

(6) Seeks the coordination of views of affected state and local elected officials in one state with those of another state when proposed federal financial assistance or direct federal development has an impact on interstate metropolitan urban centers or other interstate areas; and

(7) Supports state and local governments by discouraging the reauthorization or creation of any planning organization which is federally-funded, which has a limited purpose, and which is not adequately representative of, or accountable to, state or local elected officials.

§ 1005.5 What is the Secretary's obligation with respect to Federal interagency coordination?

The Secretary, to the extent practicable, consults with and seeks advice from all other substantially affected federal departments and agencies in an effort to assure full coordination between such agencies and the Department regarding programs and activities covered under these regulations.

§ 1005.6 What procedures apply to the selection of programs and activities under these regulations?

(a) A state may select any program or activity published in the Federal Register in accordance with § 1005.3 of this part for intergovernmental review under these regulations. Each state, before selecting programs and activities, shall consult with local elected officials.

(b) Each state that adopts a process shall notify the Secretary of the Department's programs and activities selected for that process.

(c) A state may notify the Administrator of changes in its selections at any time. For each change, the state shall submit to the Secretary an assurance that the state has consulted with local elected officials regarding the change. The Department may establish deadlines by which states are required to inform the Secretary of changes in their program selections.

(d) The Secretary uses a state's process as soon as feasible, depending on individual programs and activities, after the Secretary is notified of its selections.

§ 1005.7 How does the Secretary communicate with state and local officials concerning the Department's programs and activities?

(a) [Reserved]

(b) The Secretary provides notice to directly affected state, areawide, regional, and local entities in a state of proposed Federal financial assistance or direct Federal development if:

(1) The state has not adopted a process under the Order; or

(2) The assistance or development involves a program or activity not selected for the state process. This notice may be made by publication in the Federal Register or other appropriate means, which the Department in its discretion deems appropriate.

§ 1005.8 How does the Secretary provide states an opportunity to comment on proposed Federal financial assistance and direct Federal development?

(a) Except in unusual circumstances, the Secretary gives state processes or directly affected State, areawide, regional and local officials and entities—

(1) At least 30 days from the date established by the Secretary to comment on proposed Federal financial assistance in the form of noncompeting continuation awards; and

(2) At least 60 days from the date established by the Secretary to comment on proposed direct Federal development or Federal financial assistance other than noncompeting continuation awards.

(b) This section also applies to comments in cases in which the review, coordination, and communication with the Department have been delegated.

§ 1005.9 How does the Secretary receive and respond to comments?

(a) The Secretary follows the procedures in § 1005.10 if:

(1) A state office or official is designated to act as a single point of contact between a state process and all federal agencies, and

(2) That office or official transmits a state process recommendation for a program selected under § 1005.6.

(b)(1) The single point of contact is not obligated to transmit comments from state, areawide, regional or local officials and entities where there is no state process recommendation.

(2) If a state process recommendation is transmitted by a single point of contact, all comments from, state, areawide, regional, and local officials and entities that differ from it must also be transmitted.

(c) If a state has not established a process, or is unable to submit a state process recommendation, state, areawide, regional and local officials and entities may submit comments either to the applicant or to the Department.

(d) If a program or activity is not selected for a state process, state, areawide, regional and local officials and entities may submit comments either to the applicant or to the Department. In addition, if a state process recommendation for a nonselected program or activity is transmitted to the Department by the single point of contact, the Secretary follows the procedures of § 1005.10 of this part.

(e) The Secretary considers comments which do not constitute a state process recommendation submitted under these regulations and for which the Secretary is not required to apply the procedures of § 1005.10 of this part, when such comments are provided by a single point of contact, by the applicant, or directly to the Department by a commenting party.

§ 1005.10 How does the Secretary make efforts to accommodate intergovernmental concerns?

(a) If a state process provides a state process recommendation to the Department through its single point of contact, the Secretary either:

(1) Accepts the recommendation;

(2) Reaches a mutually agreeable solution with the state process; or

(3) Provides the single point of contact with such written explanation of the decision, as the Secretary in his or her discretion deems appropriate. The Secretary may also supplement the written explanation by providing the explanation to the single point of contact by telephone, other telecommunication, or other means.

(b) In any explanation under paragraph (a)(3) of this section, the Secretary informs the single point of contact that:

(1) The Department will not implement its decision for at least ten days after the single point of contact receives the explanation; or

(2) The Secretary has reviewed the decision and determined that, because of unusual circumstances, the waiting period of at least ten days is not feasible.

(c) For purposes of computing the waiting period under paragraph (b)(1) of this section, a single point of contact is presumed to have received written notification 5 days after the date of mailing of such notification.

§ 1005.11 What are the Secretary's obligations in interstate situations?

(a) The Secretary is responsible for:

(1) Identifying proposed federal financial assistance and direct federal development that have an impact on interstate areas;

(2) Notifying appropriate officials and entities in states which have adopted a process and which select the Department's program or activity;

(3) Making efforts to identify and notify the affected state, areawide, regional, and local officials and entities in those states that have not adopted a process under the Order or do not select the Department's program or activity;

(4) Responding pursuant to § 1005.10 of this part if the Secretary receives a recommendation from a designated areawide agency transmitted by a single point of contact, in cases in which the review, coordination, and communication with the Department have been delegated.

(b) The Secretary uses the procedures in § 1005.10 if a state process provides a state process recommendation to the Department through a single point of contact.

§ 1005.12 How may a state simplify, consolidate, or substitute federally required state plans?

(a) As used in this section:

(1) Simplify means that a state may develop its own format, choose its own submission date, and select the planning period for a state plan.

(2) Consolidate means that a state may meet statutory and regulatory requirements by combining two or more plans into one document and that the state can select the format, submission date, and planning period for the consolidated plan.

(3) Substitute means that a state may use a plan or other document that it has developed for its own purposes to meet Federal requirements.

(b) If not inconsistent with law, a state may decide to try to simplify consolidate, or substitute federally required state plans without prior approval by the Secretary.

(c) The Secretary reviews each state plan that a state has simplified, consolidated, or substituted and accepts the plan only if its contents meet federal requirements.

§ 1005.13 May the Secretary waive any provision of these regulations?

In an emergency, the Secretary may waive any provision of these regulations.

PART 1008 RECORDS MAINTAINED ON INDIVIDUALS (PRIVACY ACT)

Authority: 42 U.S.C. 7101 et seq.; 50 U.S.C. 2401 et seq.; 5 U.S.C. 552; 5 U.S.C. 552a; 42 U.S.C. 7254; and 5 U.S.C. 301. Section 1008.22(c) also issued under 42 U.S.C. 405 note.

Source: 45 FR 61577, Sept. 16, 1980, unless otherwise noted.

Subpart A General Provisions

§ 1008.1 Purpose and scope.

(a) This part establishes the procedures to implement the Privacy Act of 1974 (Pub. L. 93-579, 5 U.S.C. 552a) within the Department of Energy.

(b) This part applies to all systems of records, as defined in § 1008.2(m), maintained by DOE.

(c) This part applies to all divisions within the DOE, and to the personnel records of the Federal Energy Regulatory Commission (FERC), which are maintained by DOE on behalf of FERC. These regulations do not apply to other systems of records maintained by FERC. These regulations also apply to DOE contractors and their employees to the extent required by 5 U.S.C. 552a(m).

§ 1008.2 Definitions.

(a) Department or Department of Energy (DOE) means all organizational entities which are a part of the executive department created by title II of the Department of Energy Organization Act, Public Law 95-91, except the Federal Energy Regulatory Commission (FERC).

(b) Director, Office of Hearings and Appeals means the Director or his delegate.

(c) DOE locations means each of the following DOE components:

(1) Bonneville Power Administration, P.O. Box 3621-KDP-7, Portland, OR 97232.

(2) Carlsbad Field Office, P.O. Box 3090, Carlsbad, NM 88221.

(3) Chicago Office, 9800 S. Cass Avenue, Argonne, IL 60439.

(4) Environmental Management Consolidated Business Center, 250 East 5th Street, Suite 500, Cincinnati, OH 45202.

(5) Golden Field Office, 1617 Cole Boulevard, Golden, CO 80401.

(6) Headquarters, Department of Energy, Washington, DC 20585.

(7) Idaho Operations Office, 1955 Fremont Avenue, MS 1203, Idaho Falls, ID 83401.

(8) National Nuclear Security Administration Service Center, P.O. Box 5400, Albuquerque, NM 87185-5400.

(9) National Nuclear Security Administration Nevada Site Office, P.O. Box 98518, Las Vegas, NV 89193-3521.

(10) National Energy Technology Laboratory, 3610 Collins Ferry Road, Morgantown, WV 26507-0800.

(11) Oak Ridge Office, P.O. Box 2001, Oak Ridge, TN 37831.

(12) Office of Scientific and Technical Information, 175 S. Oak Ridge Turnpike, P.O. Box 62, Oak Ridge, TN 37830.

(13) Pacific Northwest Site Office, P.O. Box 350, Mail Stop K8-50, Richland, WA 99352.

(14) Pittsburgh Naval Reactors, P.O. Box 109, West Mifflin, PA 15122-0109.

(15) Richland Operations Office, P.O. Box 550, Mail Stop A7-75, Richland, WA 99352.

(16) Savannah River Operations Office, P.O. Box A, Aiken, SC 29801.

(17) Schenectady Naval Reactors, P.O. Box 1069, Schenectady, NY 12301.

(18) Southeastern Power Administration, 1166 Athens Tech Road, Elberton, GA 30635-6711.

(19) Southwestern Power Administration, One West Third, S1200, Tulsa, OK 74103.

(20) Strategic Petroleum Reserve Project Management Office, 900 Commerce Road East-MS FE-455, New Orleans, LA 70123.

(21) Western Area Power Administration, 12155 W. Alameda Parkway, P.O. Box 281213, Lakewood, CO 80228-8213.

(d) General Counsel means the General Counsel provided for in section 202(b) of the Department of Energy Organization Act, or any DOE attorney designated by the General Counsel.

(e) Headquarters means all DOE facilities functioning within the Washington, DC metropolitan area.

(f) Individual means a citizen of the United States or an alien lawfully admitted for permanent residence, but does not include proprietorships, businesses, or corporations. Where appropriate, the term individual also includes a duly authorized representative of an individual.

(g) Maintain means maintain, collect, use, or disseminate.

(h) Privacy Act Officer means the person designated by the Director, Office of Administration, as responsible for administering the DOE's program for implementing the requirements of the Privacy Act of 1974 at the DOE locations listed at § 1008.2(c).

(i) Record means any item, collection, or grouping of information about an individual that is maintained by or for the DOE including, but not limited, to education, financial transactions, medical history, and criminal or employment history, and that contains that individual's name, or other identifying number, symbol, or other identifying particulars assigned to the individual, such as a finger or voice print or photograph. See subsection (a)(4) of the Act.

(j) Routine use means, with respect to the disclosure of a record, the use of such record for a purpose which is compatible with the purpose for which it was collected. See subsection (a)(7) of the Act.

(k) Statistical record means a record in a system of records maintained for statistical research or reporting purposes only and not used in whole or in part in making any determination about an identifiable individual, except as provided by 13 U.S.C. 8. See subsection (a)(6) of the Act.

(l) System Manager means the DOE official who is responsible for a system of records as designated in the system notice of that system of records published by DOE.

(m) System of records means a group of any records under DOE control from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particulars assigned to the individual. See subsection (a)(5) of the Act.

(n) Act means the Privacy Act of 1974, Public Law 93-579; references to subsections of the Act mean subsections of section 3 of the Act.

[45 FR 61577, Sept. 16, 1980, as amended at 71 FR 68735, Nov. 28, 2006]

§ 1008.3 Employee standards of conduct with regard to privacy.

(a) The Headquarters DOE Privacy Act Officer shall assure that DOE personnel are advised of the provisions of the Privacy Act, including the criminal penalties and civil liabilities provided therein, (subsections (g) and (i) of the Act), and that DOE personnel are made aware of their responsibilities: to protect the security of personal information to assure its accuracy, relevance, timeliness and completeness; to avoid unauthorized disclosure; and to insure that no system of records concerning individuals, no matter how insignificant or specialized, is maintained without public notice.

(b) DOE personnel shall:

(1) Collect or maintain no information of a personal nature about individuals unless relevant and necessary to achieve a purpose or carry out a responsibility of the DOE as required by statute or by Executive Order. See subsection (e)(1) of the Act and § 1008.18(a).

(2) Collect information, wherever possible, directly from the individual to whom it pertains. See subsection (e)(2) of the Act and § 1009.19(a).

(3) Inform individuals from whom information is collected of the authority for collection, the principal purposes for which the information will be used, the routine uses that will be made of the information, and the effects of not furnishing the information. See subsection (e)(3) of the Act and § 1008.19(b).

(4) Collect, maintain, use or disseminate no information concerning an individual's rights guaranteed by the First Amendment, unless:

(i) The individual has volunteered such; or

(ii) The information is expressly authorized by statute to be collected, maintained, used or disseminated; or

(iii) The activities involved are pertinent to and within the scope of an authorized law enforcement activity. See subsection (e)(7) of the Act and § 1008.18(b).

(5) Advise their supervisors of the existence or proposal of any system of records which retrieves information about individuals by the individual's name or other identifying number, symbol, or identifying particulars assigned to the individual.

(6) Maintain an accounting, in the prescribed form, of all disclosures of information other than those to officers or employees who have a need for the record in the performance of their duties and those required under the Freedom of Information Act. See subsection (c) of the Act.

(7) Disclose no records other than to DOE personnel without the advance written consent of the individual, except as authorized by 5 U.S.C. 552a(b) including routine uses published in the Federal Register.

(8) Maintain and process information concerning individuals with care to insure that no inadvertent disclosure of the information is made. See subsection (e)(10) of the Act.

(9) Inform the proper DOE authorities of any information maintained in a DOE system of records which is not authorized by the Privacy Act of 1974.

(c) Heads of Headquarters Divisions and Offices and heads of the other DOE locations shall review annually the systems of records subject to their responsibility to insure compliance with the requirements of the Privacy Act of 1974.

§ 1008.4 Procedures for identifying the individual making a request for access to or amendment of records.

(a) When a request for information about or for access to or correction of a record pertaining to an individual and contained in a system of records has been made pursuant to § 1008.6, valid identification of the individual making the request shall be required before information will be given, access granted or a correction considered, to insure that information is given, corrected, or records disclosed or corrected only at the request of the proper person.

(b) Subject to paragraphs (c) and (d) of this section, an individual making a request may establish his identity by:

(1) Including with his request, if submitted by mail, a photocopy of two identifying documents bearing his name and signature, one of which shall bear his current home or business address and date of birth; or

(2) Appearing at the appropriate DOE location during the regular business hours and presenting either of the following:

(i) One identifying document bearing the individual's photograph and signature, such as a driver's license or passport; or

(ii) Two identifying documents bearing the individual's name and signature, one of which shall bear the individual's current home or business address and date of birth; or

(3) Providing such other proof of identity as the Privacy Act Officer deems satisfactory in the circumstances of a particular request.

(c) If the Privacy Act Officer or the appropriate System Manager determines that the information in a record is so sensitive that unauthorized access could cause harm or embarrassment to the individual whose record in involved, or if the individual making the request is unable to produce satisfactory evidence of identity under paragraph (b) or (d) of this section, the individual making the request may be required to submit a notarized statement attesting to his identity and his understanding of the criminal penalties provided under section 1001 of title 18 of the United States Code for making false statements to a Government agency and under subsection (i)(3) of the Act for obtaining records under false pretenses. Copies of these statutory provisions and forms of such notarized statements may be obtained upon request from the Privacy Act Officer, Headquarters, Department of Energy, Washington, DC.

(d) When an individual acting as the parent of a minor or the legal guardian of the person to whom a record pertains makes a request pursuant to § 1008.6 of this part:

(1) Such an individual shall establish his personal identity in the same manner required in either paragraph (b) or (c) of this section.

(2) In addition, such an individual shall establish his identity in the representative capacity of parent or legal guardian. In the case of the parent of a minor, the proof of identity shall be a certified or authenticated copy of the minor's birth certificate. In the case of the legal guardian of a person who has been declared incompetent due to physical or mental incapacity or age by a court of competent jurisdiction, the proof of identity shall be a certified or authenticated copy of the order from a court of competent jurisdiction.

(3) A parent or legal guardian may act only for a living individual, not for a decedent. Requests for the records of decedents will be handled under the Freedom of Information Act (5 U.S.C. 552).

§ 1008.5 Effect of the Freedom of Information Act (FOIA).

(a) DOE shall not rely on any exemption contained in the Freedom of Information Act (5 U.S.C. 552) to withhold from the individual to whom it pertains, any record which is otherwise accessible to such individual under this part.

(b) DOE shall rely on subsection (b) of the Privacy Act to withhold information from a person other than the person to whom the record pertains only when the information is also exempt from disclosure under the FOIA.

(c) Where a request for access to records is submitted pursuant to both the FOIA and the Privacy Act, the DOE shall, to the maximum extent possible, process the request under the provisions of this part, including the time limits of this part.

Subpart B Requests for Access or Amendment

§ 1008.6 Procedures for Privacy Act requests.

(a) Any individual may—

(1) Ask the DOE whether a system of records maintained by the DOE contains records about him or her;

(2) Request access to information pertaining to him or her that is maintained in a DOE system of records;

(3) Request that information about him or her in a DOE system of records be amended or corrected. Requests for correction or amendment may include inquiries concerning:

(i) Whether such information is relevant or necessary to accomplish a purpose that DOE is required to accomplish by statute or Executive Order; or

(ii) If the information is to be used by the DOE in making a determination about the individual, whether the information is as accurate, relevant, timely, or complete as is reasonably necessary to assure fairness in the determination.

(b) Requests submitted pursuant to this section shall:

(1) Be in writing and signed by the individual making the request;

(2) State that the request is a “Privacy Act Access” or “Privacy Act Amendment” request;

(3) Include the identification information required by § 1008.4;

(4) Specify, if possible, the title and identifying number of the system of records as listed in DOE's published notices of system of records;

(5) Provide if possible any additional information to aid DOE in responding to the request, for example, a description of the records sought;

(6) Indicate, as appropriate, the time, place, and form of access sought.

(c) Any request not addressed and marked as specified in paragraph (a) of this section shall be forwarded immediately to the appropriate Privacy Act Officer. An improperly addressed request will not be deemed to have been received for purposes of measuring time periods pursuant to §§ 1008.7 and 1008.10 until actual receipt by the appropriate Privacy Act Officer. The individual making the request shall be notified that the request was improperly addressed and the date when the request was received by the Privacy Act Officer.

(d) Assistance in preparing an access request pursuant to this section may be obtained from any DOE Privacy Act Officer at the locations listed at § 1008.2(e).

(e) An individual shall not be required to state a reason or otherwise justify his request for information or access to a record pertaining to him/her that is contained in a system of records.

§ 1008.7 Processing of requests.

(a) Receipt of a request made in accordance with § 1008.6 shall be promptly acknowledged by the Privacy Act Officer.

(b) Each request shall be acted upon promptly. Every effort will be made to respond within ten working days of the date of receipt by the System Manager or designee. If a response cannot be made within ten working days, the appropriate Privacy Act Officer shall send an interim response providing information on the status of the request, including an estimate of the time within which action is expected to be taken on the request and asking for any further information as may be necessary to respond to the request. Action will be completed as soon as possible, but not later than 20 working days after receipt of the original specific inquiry. In unusual circumstances and for good cause, the appropriate Privacy Act Officer may decide that action cannot be completed within the initial 20 working days. In such case, the appropriate Privacy Act Officer will advise the individual of the reason for the delay and the date (not to exceed an additional 20 working days) by which action can be expected to be completed.

(c) The term unusual circumstances as used in this section includes situations where a search for requested records from inactive storage is necessary; cases where a voluminous amount of data is involved; instances where information on other individuals must be separated or expunged from the particular record; and cases where consultation with other agencies which have substantial interest in the response to the request is necessary.

(d) Upon receiving a request, the Privacy Act Officer shall ascertain which System Manager or Managers of the DOE have primary responsibility for, custody of, or concern with the system or systems of records subject to the request and shall forward the request to such System Manager or Managers. The System Manager or Managers shall promptly identify and, in consultation with the General Counsel, review the records encompassed by the request.

(e) Where the request is for access to or information about records, after reviewing the material the System Manager or Managers concerned shall transmit to the Privacy Act Officer the requested material. The transmission to the Privacy Act Officer shall include any recommendation that the request be granted or wholly or partially denied and shall set forth any exemption categories supporting denials. Any denial recommendation must be concurred in by the appropriate General Counsel.

(f) Where the request is for correction or amendment of records, after reviewing the material the System Manager or Managers shall transmit a recommended decision to the Privacy Act Officer. Any recommendation that the request be granted or wholly or partially denied shall cite the exemption relied on and set forth the policy considerations supporting a denial. Any recommendation of denial must be concurred in by General Counsel.

§ 1008.8 Action in response to a request for access: disclosure of requested information to subject individuals.

(a) Consistent with the recommendation of the System Manager and the concurrence of the appropriate General Counsel, the Privacy Act Officer shall provide to the requesting individual the information about or access to a record or information pertaining to the individual contained in a system of records, unless the request is being denied in accordance with § 1008.9 of this part. The Privacy Act Officer shall notify the individual of such determination and provide the following information:

(1) Whether there is information or a record pertaining to him that is contained in a system of records;

(2) The methods of access as set forth in paragraph (b) of this section;

(3) The place at which the record or information may be inspected;

(4) The earliest date on which the record or information may be inspected and the period of time that the record or information will remain available for inspection. In no event shall the earliest date be later than thirty calendar days from the date of notification.

(5) An indication that copies of the records are enclosed, or the estimated date by which a copy of the record could be mailed and the estimate of fees that would be charged to provide other than the first copy of the record, pursuant to § 1008.13.

(6) The fact that the individual, if he wishes, may be accompanied by another person during the in-person review of the record or information, provided that the individual shall first furnish to the Privacy Act Officer a written statement authorizing disclosure of that individual's record in the accompanying person's presence; and

(7) Any additional requirements that must be satisfied in order to provide information about or to grant access to the requested record or information.

(b) The following methods of access to records or information pertaining to an individual and contained in a system of records may be available to that individual depending on the circumstances of a particular request:

(1) A copy of the record may be enclosed with the initial response in accordance with paragraph (a) of this section;

(2) Inspection in person may be arranged during the regular business hours of the DOE in the office specified by the Privacy Act Officer;

(3) Transfer of records to a Federal facility more convenient to the individual may be arranged, but only if the Privacy Act Officer determines that a suitable facility is available, that the individual's access can be properly supervised at that facility, and that transmittal of the records or information to that facility will not unduly interfere with operations of the DOE or involve unreasonable costs, in terms of money or manpower; and

(4) The requested number of copies in addition to the initial copy may be mailed at the request of the individual, subject to payment of the fees prescribed in § 1008.13.

(c) If the Privacy Act Officer believes, based upon a recommendation of the System Manager and the agency's medical officer, that disclosure of medical and/or psychological information directly to an individual could have an adverse effect upon that individual, the individual may be asked:

(1) To designate in writing a physician or mental health professional to whom he would like the records to be disclosed; or

(2) To submit a signed statement by his physician or a mental health professional indicating that, in his view, disclosure of the requested records or information directly to the individual will not have an adverse effect upon the individual. If the individual refuses to designate a physician or mental health professional, or to submit a signed statement from his physician or mental health professional as provided in paragraphs (c) (1) and (2) of this section, the request will be considered denied, and the appeal rights provided in § 1008.11 will be available to the individual.

(d) The Privacy Act Officer shall supply such other information and assistance at the time of an individual's review of his record as is necessary to make the record intelligible to the individual.

(e) The DOE will, as required by subsection (d)(1), assure an individual's right “to review his or her record and have a copy made of all or any portion thereof in a form comprehensible to him.” However, original records will be made available to individuals only under the supervision of the Privacy Act Officer or his designee. Individuals will be provided at their request with a copy, but not the original, of records pertaining to them.

§ 1008.9 Action in response to a request for access: initial denial of access.

(a) A request by an individual for information about or access to a record or information pertaining to that individual that is contained in a system of records may be denied only upon a determination by the appropriate System Manager, with the concurrence of the appropriate General Counsel, that:

(1) The record is subject to an exemption under § 1008.12;

(2) The record is information compiled in reasonable anticipation of a civil action or proceeding; or

(3) The individual has unreasonably failed to comply with the procedural requirements of this part.

(b) The Privacy Act Officer shall give written notice of the denial of a request of information about or access to records or information pertaining to the individual and contained in a system of records. Such written notice shall be sent by certified or registered mail, return receipt requested and shall include the following information:

(1) The System Manager's name and title;

(2) The reasons for the denial, including citation to the appropriate sections of the Privacy Act and this part; and

(3) Notification of the individual's right to appeal the denial pursuant to § 1008.11 and to administrative and judicial review under 5 U.S.C. 552a(g)(1)(B), as limited by 552a(g)(5).

(c) Nothing in this section shall:

(1) Require the furnishing of information or records that are not retrieved by the name or by some other identifying number, symbol or identifying particular of the individual making the request;

(2) Prevent a System Manager from waiving any exemption authorizing the denial of records, in accordance with § 1008.12.

§ 1008.10 Action in response to a request for correction or amendment of records.

(a) The Privacy Act Officer must respond in writing to the requester for amendment of a record within 10 working days of receipt. This response shall inform the requester of the decision whenever possible.

(b) If the decision cannot be reached within 10 working days, the requester shall be informed of the reason for delay and the date (within 20 working days) it is expected that the decision will be made.

(c) The Privacy Act Officer, consistent with the recommendation of the System Manager or Managers, as concurred in by the appropriate General Counsel, if appropriate, shall do one of the following:

(1) Instruct the System Manager to make the requested correction or amendment; and advise the individual in writing of such action, providing either a copy of the corrected or amended record, or a statement as to the means whereby the correction or amendment was accomplished in cases where a copy cannot be provided (for example, erasure of information from a record maintained only in an electronic data bank); or

(2) Inform the individual in writing that his request is denied in whole or in part. Such denial shall be sent by certified or registered mail, return receipt requested, and shall provide the following information:

(i) The System Manager's name and title;

(ii) The reasons for the denial; including citation to the appropriate sections of the Act and this part; and

(iii) Notification of the individual's right to appeal the denial pursuant to § 1008.11 and to administrative and judicial review under 5 U.S.C. 552a(g)(1)(B), as limited by 5 U.S.C. 552a(g)(5).

(iv) Notification of the right of the individual to submit a statement of disagreement consistent with § 1008.11(g).

(d) Whenever an individual's record is amended pursuant to a request by that individual, the Privacy Act Officer or the System Manager, as appropriate, shall notify all persons and agencies to which the amended portion of the record had been disclosed prior to its amendment, if an accounting of such disclosure was required by the Act. The notification shall request a recipient agency maintaining the record to acknowledge receipt of the notification, to correct or amend the record and to apprise an agency or person to which it had disclosed the record of the substance of the amendment.

(e) The following criteria will be taken into account by the DOE in reviewing a request for amendment:

(1) The sufficiency of the evidence submitted by the individual;

(2) The factual accuracy of the information;

(3) The relevance and necessity of the information in relation to the purpose for which it was collected;

(4) If such information is used in making any determination about the individual, whether the information is as accurate, relevant, timely, and complete as is reasonably necessary to assure fairness to the individual in such determination;

(5) The degree of possibility that denial of the request could unfairly result in a determination adverse to the individual;

(6) The nature of the record sought to be corrected or amended; and

(7) The propriety and feasibility of complying with the specific means of amendment requested by the individual.

(f) The DOE will not undertake to gather evidence for the individual, but does reserve the right to verify the evidence that the individual submits.

(g) Amendment of a record requested by an individual may be denied upon a determination that:

(1) The individual has failed to establish, by a preponderance of the evidence, the propriety of the amendment in relation to the criteria stated in paragraph (c) of this section;

(2) The record sought to be amended was compiled in a terminated judicial, quasi-judicial or quasi-legislative proceeding to which the individual was a party or participant;

(3) The record sought to be amended is the subject of a pending judicial, quasi-judicial or quasi-legislative proceeding to which the individual is a party or participant;

(4) The amendment would violate a duly enacted statute or promulgated regulation;

(5) The individual has unreasonably failed to comply with the procedural requirements of this part; or

(6) The record has been properly exempted from the provisions of subsection (d) of the Act.

(h) Nothing in this section shall restrict the DOE from granting in part or denying in part a request for amendment of records.

[45 FR 61577, Sept. 16, 1980; 46 FR 31637, June 17, 1981]

§ 1008.11 Appeals of denials of requests pursuant to § 1008.6.

(a) Any individual may appeal the denial of a request made by him for information about or for access to or correction or amendment of records. An appeal shall be filed within 30 calendar days after receipt of the denial. When an appeal is filed by mail, the postmark is conclusive as to timeliness. The appeal shall be in writing and must be signed by the individual. The words “PRIVACY ACT APPEAL” should appear in capital letters on the envelope and the letter. Appeals of denials relating to records maintained in government-wide systems of records reported by the OPM, shall be filed, as appropriate, with the Assistant Director for Agency Compliance and Evaluation, Office of Personnel Management (OPM), 1900 E Street, NW., Washington, DC 20415. All other appeals relating to DOE records shall be directed to the Director, Office of Hearings and Appeals (OHA), Department of Energy, Headquarters, Washington, DC.

(b) An appeal not addressed and marked as specified in paragraph (a) of this section shall be forwarded immediately to the Assistant Director for Agency Compliance and Evaluation, OPM, or the Director, OHA, as appropriate. An appeal that is not properly addressed by an individual shall not be deemed to have been received for purposes of time periods in this section until actual receipt of the appeal by the Assistant Director, OPM, or the Director, OHA. In each instance when an appeal so forwarded is received, the individual filing the appeal shall be notified that the appeal was improperly addressed and the date when the appeal was received by the Assistant Director, OPM, or the Director, OHA.

(c) The appeal shall include the following:

(1) A copy of the original request for access or for amendment;

(2) A copy of the initial denial; and

(3) A statement of the reasons why the initial denial is believed to be in error.

(d) The records or record to which the individual was denied access, or which was requested to be corrected or amended, will be supplied to the appropriate appeal authority by the Privacy Act Officer who issued the initial denial. While such records normally will comprise the entire record on appeal, the appeal authority may seek such additional information as is necessary to assure that the final determination is fair and equitable.

(e) No personal appearance or hearing on appeal will be allowed.

(f) The appropriate appeal authority for DOE records shall act upon the appeal and issue a final determination in writing no later than 20 working days from the date on which the appeal is received. However, the appeal authority may extend the ten-day period upon a determination that a fair and equitable review cannot be made within that period. In such cases the individual shall be advised in writing of the reason for the extension and of the estimated date by which a final determination will be issued. The final determination shall be issued not later than the 30th working day after receipt of the appeal unless unusual circumstances, as defined in § 1008.7, are present, whereupon an additional 30 days may be extended.

(g) If an appeal of a denial of access is granted, a copy of the determination shall be transmitted promptly to the individual, the Privacy Act Officer and the appropriate System Manager. Upon receipt of the determination, the Privacy Act Officer promptly shall take action consistent with § 1008.8.

(h) If an appeal of a denial of correction or amendment is granted, the final determination shall identify the specific corrections or amendments to be made. A copy of the determination shall be transmitted promptly to the individual, the Privacy Act Officer and the appropriate System Manager. Upon receipt of the determination, the Privacy Act Officer promptly shall take steps to insure that the actions set forth in § 1008.10 (a) and (b) are taken.

(i) If the appeal of a denial of access is denied, the final determination shall state the reasons for the denial and shall be transmitted promptly to the individual, the Privacy Act Officer and the appropriate System Manager. The determination shall also include a statement identifying the right of the individual to administrative and judicial review pursuant to 5 U.S.C. 552a(g)(1)(B) as limited by 5 U.S.C. 552a(g)(5).

(j) If the appeal of a denial of correction or amendment is denied, the final determination shall state the reasons for the denial and shall be transmitted promptly to the individual, the Privacy Act Officer and the appropriate System Manager.

(1) The determination also shall include the following:

(i) Notice of the right of the individual to file with the Privacy Act Officer a concise, signed statement of reasons for disagreeing with the final determination, receipt of which statement will be acknowledged by the Privacy Act Officer.

(ii) An indication that any disagreement statement filed by the individual will be noted and appended to the disputed record and that a copy of the statement will be provided by the Privacy Act Officer or the System Manager, as appropriate, to persons and agencies to which the record is disclosed subsequent to the date of receipt of such statement;

(iii) An indication that the DOE shall append to any disagreement statement filed by the individual a copy of the final determination or a summary thereof, which determination or summary also will be provided to persons and agencies to which the disagreement statement is disclosed; and,

(iv) A statement of the right of the individual to administrative and judicial review under 5 U.S.C. 552a(g)(1)(B), as limited by 5 U.S.C. 552a(g)(5).

(2) Although a copy of the final determination or a summary thereof will be treated as part of the individual's record for purposes of disclosure in instances where the individual has filed a disagreement statement, it will not be subject to correction or amendment by the individual.

(3) Where an individual files a statement of disagreement consistent with paragraph (j)(1) of this section, the Privacy Act Officer shall take steps to insure that the actions provided in paragraphs (j)(1) (i), (ii) and (iii) of this section are taken.

§ 1008.12 Exemptions.

(a) General exemptions—(1) Generally. 5 U.S.C. 552a(j)(2) allows the exemption of any system of records within the DOE from any part of section 552a except subsections (b), (c)(1) and (2), (e)(4)(A) through (F) (e)(6), (7), (9), (10), and (11), and (i) of the Act if the system of records is maintained by a DOE component which performs as its principal function any activity pertaining to the enforcement of criminal laws, including police efforts to prevent, control, or reduce crime or to apprehend criminals, and which consists of:

(i) Information compiled for the purpose of identifying individual criminal offenders and alleged offenders;

(ii) Information compiled for the purpose of a criminal investigation, including reports of informants and investigators, and associated with an identifiable individual; or

(iii) Reports identifiable to an individual compiled at any stage of the process of enforcement of the criminal laws from arrest or indictment through release from supervision.

(2) Applicability of general exemptions to DOE systems of records—(i) Investigative Files of the Inspector General (DOE-54). This system of records is being exempted pursuant to subsection (j)(2) of the Act in order to aid the Office of the Inspector General in the performance of its law enforcement function. The system is exempted from subsections (c)(3) and (4); (d)(1)-(4); (e)(1)-(3); (4)(G), (H), and (I); (5) and (8); and (g) of the Act. The system is exempt from these provisions for the following reasons: notifying an individual at the individual's request of the existence of records in an investigative file pertaining to such individual, or granting access to an investigative file could (A) interfere with investigative and enforcement proceedings and with co-defendants' right to a fair trial; (B) disclose the identity of confidential sources and reveal confidential information supplied by these sources; and (C) disclose investigative techniques and procedures.

(ii) Law Enforcement Investigative Records (DOE-84). This system of records is being exempted pursuant to subsection (j)(2) of the Act to enable the Office of Counterintelligence to carry out its duties and responsibilities as they pertain to its law enforcement function. The system is exempted from subsections (c)(3) and (4), (d), (e) (1), (2), and (3), (e)(4) (G) and (H), (e)(8), (f), and (g) of the Act. The system is exempt from these provisions for the following reasons: Notifying an individual at the individual's request of the existence of records in an investigative file pertaining to such individual, or granting access to an investigative file could interfere with investigative and enforcement proceedings and with co-defendants' right to a fair trial; disclose the identity of confidential sources and reveal confidential information supplied by these sources; and disclose investigative techniques and procedures.

(b) Specific exemptions. Subsection (k) of the Privacy Act establishes seven categories of systems of records which may be exempted from subsections (c)(3), (d), (e)(1), (e)(4)(G), (H) and (I), and (7) of the Act. The Department has exempted systems of records under four of these provisions, as follows:

(1) Classified material. (i) Subsection (k)(1) permits exemption of systems of records that are specifically authorized under criteria established under statute or Executive Order to be kept secret in the interest of national defense or foreign policy, and are in fact properly classified pursuant to such statute or Executive Order. Restricted Data and Formerly Restricted Data under the Atomic Energy Act of 1954, as amended, are included in this exemption.

(ii) The DOE systems of records listed below have been exempted under subsection (k)(1) to the extent they contain classified information, in order to prevent serious damage to the national defense or foreign policy that could arise from providing individuals access to classified information. Systems exempted under subsection (k)(1) are:

(A) Alien Visits and Participation (DOE-52).

(B) Clearance Board Cases (DOE-46).

(C) Security Correspondence Files (DOE-49).

(D) Foreign Travel Records (DOE-27)

(E) Legal Files (Claims, Litigations, Criminal Violation, Patents, and other Legal Files) (DOE-41).

(F) Personnel Security Clearance Files (DOE-43).

(G) Personnel Security Clearance Index (Automated) (DOE-42).

(H) Special Access Authorization for Categories of Classified Information (DOE-44).

(I) Administrative and Analytical Records and Reports (DOE-81).

(J) Law Enforcement Investigative Records (DOE-84).

(K) Employee Concerns Program Records (DOE-3)

(L) Whistleblower Investigation, Hearing and Appeal Records (DOE-7)

(M) Intelligence Related Access Authorization (DOE-15)

(N) Research, Technology, and Economic Security Due Diligence Review Records (DOE-85).

(2) Investigatory material compiled for law enforcement purposes. (i) Subsection (k)(2) permits the exemption of investigatory material compiled for law enforcement purposes: Provided, however, That if any individual is denied any right, privilege, or benefit to which he would otherwise be entitled by Federal law, or for which he would otherwise be eligible, as a result of the maintenance of such material, such material shall be provided to such individual, except to the extent that the disclosure of such material would reveal the identity of a source who furnished information to the Government under an express promise that the identity of the source would be held in confidence, or, prior to September 27, 1975, under an implied promise that the identity of the source would be held in confidence.

(ii) The DOE systems of records listed below have been exempted under subsection (k)(2) in order to prevent subjects of investigation from frustrating the investigatory process through access to records about themselves or as a result of learning the identities of confidential informants; to prevent disclosure of investigative techniques; to maintain the ability to obtain necessary information; and thereby to insure the proper functioning and integrity of law enforcement activities. Systems of records exempted under subsection (k)(2) are:

(A) Alien Visits and Participation (DOE-52).

(B) Clearance Board Cases (DOE-46).

(C) Security Correspondence Files (DOE-49).

(D) Foreign Travel Records (DOE-27).

(E) Legal Files (Claims, Litigation, Criminal Violations, Patents, and other Legal Files) (DOE-41).

(F) Personnel Security Clearance Files (DOE-43).

(G) Personnel Security Clearance Index (Automated) (DOE-42).

(H) Special Access Authorization for Categories of Classified Information (DOE-44).

(I) DOE Personnel and General Employment Records (DOE-1) (only personnel investigative records concerning current and former DOE employees and applicants for employment by DOE).

(J) Investigative Files of the Inspector General (DOE-54) (only investigative records concerning past and present DOE employees).

(K) Administrative and Analytical Records and Reports (DOE-81).

(L) Law Enforcement Investigative Records (DOE-84).

(M) Allegation-Based Inspections Files of the Office of Inspector General (DOE-83).

(N) Employee Concerns Program Records (DOE-3).

(O) Whistleblower Investigation, Hearing and Appeal Records (DOE-7).

(P) Intelligence Related Access Authorization (DOE-15).

(Q) Nondiscrimination in Federally Assisted Program Files (DOE-42).

(3) Investigatory material compiled for determining suitability for Federal employment. (i) Subsection (k)(5) permits exemption of systems of records that contain investigatory material compiled solely for the purpose of determining suitability, eligibility, or qualification for Federal civilian employment, military service, Federal contracts, or access to classified information, but only to the extent that the disclosure of such material would reveal the identity of a source who furnished information to the Government under an express promise that the identity of the source would be held in confidence, or, prior to September 27, 1975, under an implied promise that the identity of the source would be held in confidence.

(ii) The DOE systems of records listed below have been exempted under subsection (k)(5) to the extent they contain the kinds of records described in subsection (k)(5) in order to maintain DOE's ability to obtain candid information on candidates for employment, contracts, or access to classified information and to fulfill commitments made to sources to protect the confidentiality of information, and thereby to facilitate proper selection or continuation of the best applicants or persons for a given position or contract. Systems exempted under subsection (k)(5) are:

(A) DOE Personnel and General Employment Records (DOE-1);

(B) Personnel Security Clearance Files (DOE-43);

(C) Investigative Files of the Inspector General (DOE-54);

(D) Alien Visits and Participation (DOE-52);

(E) Clearance Board Cases (DOE-46);

(F) Security Correspondence Files (DOE-49);

(G) Foreign Travel Records (DOE-27);

(H) Legal Files (Claims, Litigation, Criminal Violations, Patents, and other Legal Files) (DOE-41);

(I) Personnel Security Clearance Index (Automated) (DOE-42);

(J) Special Access Authorization for Categories of Classified Information (DOE-44);

(K) DOE Personnel: Supervisor-Maintained Personnel Records (DOE-2);

(L) Applications for DOE Employment (DOE-4);

(M) Administrative and Analytical Records and Reports (DOE-81);

(N) Law Enforcement Investigative Records (DOE-84).

(O) Allegation-Based Inspections Files of the Office of Inspector General (DOE-83).

(P) Employee Concerns Program Records (DOE-3)

(Q) Whistleblower Investigation, Hearing and Appeal Records (DOE-7)

(R) Intelligence Related Access Authorization (DOE-15)

(4) Testing or examination material. (i) Subsection (k)(6) permits exemption of systems of records that include testing or examination material used solely to determine individual qualifications for appointment or promotion in the Federal service, the disclosure of which would compromise the objectivity or fairness of the testing of examination process.

(ii) The DOE systems of records listed below have been exempted to the extent they contain testing or examination material in order to protect the integrity of the personnel testing and evaluation process and to avoid providing individuals with unfair advantage, by premature or unfair disclosure of testing or rating information. Systems exempted under subsection (k)(6) are:

(A) (DOE-2) DOE Personnel: Supervisor-Maintained Personnel Records.

(B) (DOE-4) Applications for DOE Employment.

(C) (DOE-1) DOE Personnel and General Employment Records.

(c) Application of exemptions to particular requests. (1) The Privacy Act Officer, consistent with the recommendation of the System Manager and with concurrence of the appropriate General Counsel, may make available records which the DOE is authorized to withhold under this section.

(2) With respect to records containing material or information that would reveal the identity of a source who was given an assurance of confidentiality, a determination to make records available pursuant to paragraph (c)(1) of this section shall be made only if the source consents to the release of such information to the individual, or if it is determined that the material or information is not adverse or detrimental to the individual, or for good cause shown. The exercise of discretion with respect to waiver of the exemption shall be final.

(3) Prior to making a determination to deny access to a record in a system of records covered by exemption (k)(1) for classified material (see paragraph (b)(1) of this section), the System Manager shall consult with the Director, Division of Classification, to verify the current classification status of the information in the requested record.

[45 FR 61577, Sept. 16, 1980, as amended at 60 FR 35836, July 12, 1995; 62 FR 67519, Dec. 24, 1997; 67 FR 4171, Jan. 29, 2002; 89 FR 101854, Dec. 17, 2024]

§ 1008.13 Fees.

(a) The only fees to be charged to or collected from an individual under the provisions of this part are for copying records at the request of the individual. The fee charged shall be consistent with the fee schedule set forth in paragraph (b) of this section.

(1) No fees shall be charged or collected for the following: Search for and retrieval of records; review of records; copying by the DOE incident to granting access; copying at the initiative of the DOE without a request from the individual; copying when the aggregate of fees for copying is $25 or less; time spent providing copies; transportation of records and personnel; and first class postage.

(2) It is the policy of the DOE to provide an individual with one copy of each record corrected or amended pursuant to request without charge.

(3) As required by the Office of Personnel Management in its published regulations implementing the Act, the DOE will charge no fee for a single copy of a personnel record covered by that Commission's Government-wide published notice of systems of records.

(b) The schedule of fees is as follows:

(1) $.10 per copy of each page.

(2) For other forms of copying and other forms of materials (e.g., cassettes, computer materials), the direct cost of the materials, personnel, and equipment shall be charged, but only with prior specific approval of the person making the request, when such charges would be in excess of $25.

(c) The Privacy Act Officer may, upon application by an individual, furnish any records without charge or at a reduced rate, if the Privacy Act Officer determines that such waiver or reduction of fees is in the public interest.

(d) Payment shall be made by check or money order payable to the United States Department of Energy.

(e) Advance payment of all or part of the fees may be required at the discretion of the Privacy Act Officer. Unless the individual requesting the copies specifically states that he is willing to pay whatever fees are assessed for meeting the request or, alternatively, specifies an amount in excess of $25 that he is willing to pay and which in fact covers the anticipated fees for meeting the request, a request that is expected to involve assessed fees in excess of $25 shall not be deemed to have been received, for purposes of the time periods specified in §§ 1008.7 and 1008.10 until the individual making the request is notified of the anticipated cost, agrees to bear it, and makes any advance deposit required. Such notification shall be made by the Privacy Act Officer as promptly as possible after receipt of the request.

§ 1008.14 Requests under false pretenses.

Subsection (i)(3) of the Act provides that any person who knowingly and willingly requests or obtains any record concerning an individual from an agency under false pretenses shall be quilty of a misdeamenaor and fined not more than $5,000.

§ 1008.15 Civil remedies.

Subsection (g) of the Act provides that an individual may bring suit against the DOE for a violation of the Privacy Act, as follows:

(a) If the DOE refuses to grant a request for access to an individual's records, the court may order the DOE to provide the individual with access to his or her records and award reasonable litigation costs and attorney's fees.

(b) If the DOE refuses to amend a record or fails to review an amendment request as required by subsection (d)(3) of the Act, the court may order the DOE to make the amendment and award reasonable litigation costs and attorney's fees.

(c) If the DOE makes an adverse determination based on a record which is not maintained in an accurate, timely, relevant, and complete manner, the individual may be awarded actual damages of at least $1,000. In order to prevail, the individual must show that:

(1) The DOE's action was willful and intentional; and

(2) The adverse determination was based on the faulty record.

(d) If the DOE fails to comply with any other provision of the Privacy Act or agency rule promulgated under the Act, in such a way as to have an adverse effect on the individual, the court may award actual damages of at least $1,000. In order to prevail, the individual must show that:

(1) The DOE's action was willful and intentional; and

(2) The agency's action had an adverse effort on the individual; and

(3) The adverse effect was causally related to the DOE's action.

Subpart C Disclosure to Third Parties

§ 1008.16 Prohibition against disclosure.

Except as provided in § 1008.17, the DOE shall not disclose any record which is contained in a system of records, by any means of communication, to any agency or to any person other than the individual who is the subject of the record.

§ 1008.17 Conditions of disclosure.

(a) Notwithstanding the prohibition contained in § 1008.16, the DOE may disclose records covered by this part (1) to the individual to whom the record pertains or to an agency or (2) to a person other than the individual where he has given his prior written consent to the disclosure or has made a written request for such disclosure.

(b) Notwithstanding the prohibition contained in § 1008.16 the DOE may also disclose records covered by this part whenever the disclosure is:

(1) To officers and employees of the DOE who have a need for the record in the performance of their duties;

(2) Required under the Freedom of Information Act (5 U.S.C. 552);

(3) For a routine use (as defined in § 1008.2) which is described in the Federal Register notice for the system of records which the disclosure is to be made;

(4) To the Bureau of the Census for purposes of planning or carrying out a census or survey or related activity pursuant to the provisions of title 13 of the United States Code;

(5) To a recipient who has provided the agency with advance adequate written assurance that the record will be used solely as a statistical research or reporting record, and the record is to be transferred in a form that is not individually identifiable;

(6) To the National Archives of the United States as a record which has sufficient historical or other value to warrant its continued preservation by the United States Government, or for evaluation by the Administrator of General Services or his designee to determine whether the record has such value;

(7) To another agency or to an instrumentality of any governmental jurisdiction within or under the control of the United States for a civil or criminal law enforcement activity if the activity is authorized by law and if the head of the agency or instrumentality has made a written request to the DOE specifying the particular portion desired and the law enforcement activity for which the record is sought;

(8) To a person pursuant to a showing of compelling circumstances affecting the health or safety of an individual if upon such disclosure notification is transmitted to the last known address of such individual;

(9) To either House of Congress, or to any committee or subcommittee thereof, any joint committee of Congress or subcommittee of any such joint committee, to the extent of matter within its jurisdiction;

(10) To the Comptroller General, or any of his authorized representatives, in the course of the performance of the duties of the General Accounting Office;

(11) Pursuant to the order of a court of competent jurisdiction.

(c) Notwithstanding the prohibition contained in § 1008.16 of this part, the DOE may also disclose records covered by this part when disseminating a corrected or amended record or notation of a disagreement statement as required by subsection (c)(4) of the Act.

§ 1008.18 Accounting for disclosures.

(a) For each disclosure of information contained in a system of records under his control, except disclosures to authorized officers and employees of DOE and disclosures required by the Freedom of Information Act, the appropriate System Manager shall keep an accurate accounting of:

(1) The date, nature, and purposes of each disclosure of a record made to any person or to another agency; and

(2) The name and address of the person or agency to which the disclosure was made.

(b) The accounting shall be retained for at least five years or the life of the record, whichever is longer, after the disclosure for which the accounting is made.

(c) The accounting described in paragraph (a) of this section shall be made available to the individual named in the record upon written request to the Privacy Act Officer at the appropriate DOE location listed at § 1008.2(c) of this part. However, the accounting shall not be revealed with respect to disclosures made under § 1008.17(b)(7) of this part, pertaining to law enforcement activity; or with respect to disclosures involving system of records for which DOE had claimed an exemption from certain requirements of the Act, as provided in § 1008.12 of this part.

(d) Whenever an amendment or correction of a record or a notation of dispute concerning the accuracy of records is made by the DOE in accordance with §§ 1008.10(a)(2)(iv) and 1008.11(g) of this part, DOE shall inform any person or other agency to whom the record was previously disclosed if an accounting of the disclosure was made pursuant to the requirements of paragraph (a) of this section, unless the disclosure was made pursuant to § 1008.17(b)(7) of this part; or the disclosure involved a system of records of which DOE has claimed an exemption from certain requirements of the Act, as provided in § 1008.12 of this part.

(e) The System Manager shall make reasonable efforts to serve notice on an individual when any record containing information about such individual in a DOE system of records is disclosed to any person under compulsory legal process when such process becomes a matter of public record.

(f) Prior to disclosing any record about an individual to any person other than an agency, unless the disclosure is pursuant to the Freedom of Information Act, the System Manager shall make reasonable efforts to assure that each record is accurate, complete, timely, and relevant for DOE's purposes.

§ 1008.19 Criminal penalties—improper disclosure.

Subsection (i)(1) of the Act provides that a Federal employee who willfully discloses information subject to the Privacy Act in violation of the Act or rules promulgated under it shall be guilty of a misdemeanor and fined up to $5,000.

Subpart D Maintenance and Establishment of Systems of Records

§ 1008.20 Content of systems of records.

(a) The DOE will maintain in its records only such information about an individual as is relevant and necessary to accomplish a purpose DOE is required to accomplish by statute or by Executive Order of the President, unless an exemption to this requirement has been claimed by DOE, as provided in § 1008.12 of this part.

(b) The DOE will maintain no record describing how any individual exercises rights guaranteed by the First Amendment unless expressly authorized by statute or by the individual about whom the record is maintained or unless it is pertinent to and within the scope of an authorized law enforcement activity.

(c) The DOE will maintain all records that are used by it to make any determination about any individual with such accuracy, relevance, timeliness and completeness as is reasonably necessary to assure fairness to the individual in such determination.

§ 1008.21 Collection of information by DOE about an individual for a system of records.

(a) The DOE will collect information, to the greatest extent practicable, directly from the subject individual when the use of the information may result in adverse determinations about an individual's rights, benefits and privileges under Federal programs, unless an exemption from the Act to this requirement has been claimed by DOE as provided in § 1008.12

(b) Unless an exemption from the Act has been claimed by DOE under subsection (j)(2), as provided in § 1008.12, DOE shall inform each individual whom it asks to supply information, on the form or other means by which it uses to collect the information, or on a separate form that can be retained by the individual, of the following:

(1) The authority (whether granted by statute or by Executive Order of the President) that authorizes the solicitation of the information and whether the provision of such information is mandatory or voluntary;

(2) The principal purpose or purposes for which the information is intended to be used;

(3) The routine uses that may be made of the information, as published in the Federal Register pursuant to the requirements of the Act; and

(4) The effect on the individual, if any, of not providing all or any part of the requested information.

§ 1008.22 Use and collection of Social Security numbers.

(a) The System Manager of each system of records which utilizes Social Security numbers as a method of identification without statutory authorization or authorization by regulation adopted prior to January 1, 1975, shall revise the system to avoid future collection and use of the Social Security numbers.

(b) Heads of Headquarters Divisions and Offices and heads of the other DOE locations shall insure that employees authorized to collect information from individuals are advised that individuals may not be required to furnish Social Security numbers without statutory authorization, and that individuals who are requested to provide Social Security numbers voluntarily must be advised that furnishing the number is not required and that no penalty or denial of benefits will flow from the refusal to provide it.

(c) Pursuant to the Social Security Number Fraud and Prevention Act (Pub. L. 115-59; 42 U.S.C. 405 note), Heads of Headquarters Divisions and Offices and heads of other DOE locations may not include a full Social Security number on a form or document transmitted by physical mail unless:

(1) The form or document belongs to a category of forms and documents listed on the Department's “Unredacted SSN Mailed Documents Listing” (USMDL) as published on the Department's website; or

(2) The Senior Agency Official for Privacy (SAOP) provides a one-time waiver for the form or document as provided by paragraph (d) of this section.

(d) The Heads of Headquarters Divisions and Offices and heads of other DOE locations who have a compelling business need to include a full Social Security number on a form or document that is transmitted by physical mail and which do not belong to a category of form or document listed on the USMDL may request a conditional, one-time Secretarial waiver as follows:

(1) The requesting Head of Departmental Element must prepare a memorandum for submission to the SAOP that:

(i) Identifies the document that requires transmission via physical mail;

(ii) Explains with specificity the reasons why a full Social Security number is required to be transmitted via physical mail on the document;

(iii) Provides with specificity details on why the Social Security number cannot be a partial Social Security number; and

(iv) Includes any other justification to support the Element's request, including any legal requirement that necessitates the Department sending a full Social Security number through physical mail for business or mission purposes.

(2) The Departmental Element must send the completed memorandum to the Chief Privacy Officer (CPO) for review.

(3) The CPO will review the request and forward its recommendation to the SAOP.

(4) The SAOP will review and approve or reject the Departmental Element's request.

(5) If the request is approved, the SAOP will issue a memorandum in response to the Head of the Departmental Element authorizing the conditional, one-time transmission of the document.

(e) Under circumstances where the transmitting Departmental Element anticipates a regular and frequent transmission through physical mail of a particular form or document containing Social Security numbers not already listed on the USDML, the Head of the Departmental Element may request that a new category relevant to the form or document be added to the USMDL in accordance with the procedures in paragraphs (e)(1) through (5) of this section:

(1) The requesting Departmental Element must prepare a memorandum for submission to the SAOP that:

(i) Identifies the document that requires transmission via physical mail;

(ii) Explains with specificity the reasons why a full Social Security number is required to be transmitted via physical mail on the form or document;

(iii) Provides with specificity details on why the Social Security number cannot be a partial Social Security number; and

(iv) Includes any other justification to support the Element's request, including any legal requirement that necessitates the Department sending a full Social Security number through physical mail for business or mission purposes.

(2) The Head of the Departmental Element must send the completed memorandum to the CPO for review.

(3) The CPO will review the request and forward its recommendation to the SAOP.

(4) The SAOP will review and approve or reject the Element's request.

(5) If the request is approved, the SAOP will issue a memorandum in response to the requestor stating the SAOP's determination and DOE will update the USDML and publish the updated USDML on the Department's website.

[45 FR 61577, Sept. 16, 1980, as amended at 89 FR 43736, May 20, 2024]

§ 1008.23 Public notice of systems of records.

(a) The DOE shall publish in the Federal Register at least annually a notice of the existence and character of each of its systems of records, which notice shall include:

(1) The name and location of the system;

(2) The categories of individuals on whom records are maintained in the system;

(3) The categories of records maintained in the system;

(4) Each routine use of the records contained in the system, including the categories of users and the purpose of such use, subject to paragraph (d) of this section;

(5) The policies and practices of the DOE regarding storage, retrievability, access controls, retention, and disposal of the records;

(6) The title and business address of the DOE official who is responsible for the system of records;

(7) The DOE procedures whereby an individual can be notified at his request if the system of records contains a record pertaining to him;

(8) The DOE procedures whereby an individual can be notified at his request about how he can gain access to any record pertaining to him contained in the system or records, and how he can contest its content; and

(9) The categories of source of records in the systems.

(b) Notwithstanding the requirements of paragraph (a) of this section, the notice of systems of records shall not necessarily include the information in paragraphs (a) (7) through (9) of this section if DOE has claimed a general or specific exemption from the requirements of the Act, as provided in § 1008.12.

(c) Copies of the notices as printed in the Federal Register shall be available at the DOE locations listed at § 1008.2(c). Requests by mail for copies of such notices should be sent to Privacy Act Officer, Headquarters, U.S. Department of Energy, Washington, DC. 20585. The first copy will be furnished free of charge. For each additional copy, the costs of printing and handling may be charged.

(d) DOE shall publish in the Federal Register notice of any new routine use or intended routine use of a record in the system of records, at least 30 calendar days prior to the implementation of any new routine use of a record in a system of records, or at least 30 calendar days prior to publication of the annual notice of such routine uses, as provided in paragraph (a) of this section, an opportunity for interested persons to submit written comments consisting of data, views, or arguments regarding such use to DOE, shall be provided.

§ 1008.24 Criminal penalties—failure to publish a system notice.

Subsection (i)(2) of the Act provides that an agency officer or employee who willfully maintains a system of records without publishing a system notice as required by subsection (e)(4) of the Act shall be guilty of a misdemeanor and fined up to $5,000.

PART 1009 GENERAL POLICY FOR PRICING AND CHARGING FOR MATERIALS AND SERVICES SOLD BY DOE

Authority: Sec. 644 of the Dept. of Energy Organization Act, Pub. L. 95-91, 91 Stat. 565 (42 U.S.C. 7254); Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.) “User Fee Statute”, 31 U.S.C. 483a, 42 U.S.C. 2111, 2112 and 2201.

Source: 45 FR 70430, Oct. 24, 1980, unless otherwise noted.

§ 1009.1 Purpose and scope.

(a) This part establishes Department of Energy policy for establishing prices and charges for Department materials and services sold to organizations and persons outside the Federal Government.

(b) This part applies to all elements of the Department except the Federal Energy Regulatory Commission.

§ 1009.2 Definitions.

For the purposes of this regulation:

(a) Allocable cost means a cost allocable to a particular cost objective (i.e., a specific function, project, process, or organization) if the costs incurred are chargeable or assignable to such cost objectives in accordance with the relative benefits received or other equitable relationships. Subject to the foregoing, a cost is allocable if:

(1) It is incurred solely for materials or services sold;

(2) It benefits both the customer and the Department in proportions that can be approximated through use of reasonable methods, or

(3) It is necessary to the overall operation of the Department and is deemed to be assignable in part to materials or services sold.

(b) Byproduct material means any radioactive material (except special nuclear material) yielded in or made radioactive by exposure to the radiation incident to the process of producing or utilizing special nuclear material.

(c) Charges means an accumulation of job related costs for materials and services sold by the Department.

(d) commercial price means the price that a willing buyer is currently paying or would pay a willing seller for materials and services in the market.

(e) Direct cost is any cost which can be identified specifically with a particular final cost objective.

(f) Full cost includes all direct costs and all allocable costs of producing the material or providing the service consistent with generally accepted accounting principles. Direct costs and allocable costs may include, but are not limited to, the following cost elements:

(1) Direct labor.

(2) Personnel fringe benefits.

(3) Direct materials.

(4) Other direct costs.

(5) Processing materials and chemicals.

(6) Power and other utilities.

(7) Maintenance.

(8) Indirect cost, i.e., common costs which cannot be directly assigned to specific cost objectives and are therefore allocated to cost objectives in a systematic cost allocation process.

(9) Depreciation which includes depreciation costs that are directly associated with facilities and equipment utilized, and allocated depreciation costs for support and general facilities and equipment.

(10) Added factor includes general and administrative costs and other support costs that are incurred for the benefit of the Department, an organizational unit or a material or service as a whole.

(g) Prices means the monetary amounts generally established and published for recurring sales of the same materials and services.

(h) Source material means uranium or thorium.

(i) Special nuclear material means plutonium, uranium enriched in the isotope 233 or in the isotope 235, or any materials artificially enriched by any of the foregoing. Special Nuclear Material does not include source material.

§ 1009.3 Policy.

(a) The Department's price or charge for materials and services sold to persons and organizations outside the Federal Government shall be the Government's full cost for those materials and services, unless otherwise provided in this part.

(b) Exceptions from the Department pricing and charging policy may be authorized in accordance with the following provisions:

(1) Prices and charges for byproduct material sold pursuant to 42 U.S.C. 2111 and 2112 et seq. shall be either the full cost recovery price or the commercial price, whichever is higher, except that lower prices and charges may be established by the Department if it is determined that such lower prices and charges (i) will provide reasonable compensation to the Government for such material, (ii) will not discourage the use of or the development of sources of supply independent of the DOE of such material, and (iii) will encourage research and development. In individual cases, if (ii) and (iii) cannot be equally accommodated, greater weight will be given to encouragement of research and development.

(2) Prices and charges for materials and services sold pursuant to 42 U.S.C. 2201 shall be either the full cost recovery price or the commercial price, whichever is higher, except that lower prices and charges may be established by the Department if it is determined that such lower prices and charges will provide reasonable compensation to the Government and will not discourage the development of sources of supply independent of the DOE of such material.

§ 1009.4 Exclusions.

This part shall not apply when the amount to be priced or charged is otherwise provided for by statute, Executive Order, or regulations. This part does not apply to:

(a) Fees, penalties and fines established by the Economic Regulatory Administration of DOE.

(b) Power marketing and related activities of the Alaska Power Administration, the Bonneville Power Administration, the Southeastern Power Administration, the Southwestern Power Administration, and the Western Power Administration.

(c) Crude oil, natural gas and other petroleum products and services by or from the Naval Petroleum and Oil Shale Reserves.

(d) Uranium enriching services, source material, and special nuclear material.

(e) Requests for information under the Freedom of Information Act and the Privacy Act.

(f) Energy data and information provided by the Energy Information Administration.

(g) Crude oil and related materials and services from the Strategic Petroleum Reserve.

(h) The disposal of excess and surplus property.

(i) Access permits for uranium enrichment technology issued in accordance with 10 CFR part 725.

(j) Materials and services provided pursuant to a cooperative agreement, research assistance contract or grant, or made available to a DOE contractor in connection with a contract, the primary purpose of which is to procure materials or services for DOE.

§ 1009.5 Supersessions.

Prices which appear in Federal Register Notices previously published by the Department, or its predecessor agencies, for materials and services covered by this rule are hereby superseded.

§ 1009.6 Dissemination of prices and charges.

Current prices and charges for specific materials and services are available from the DOE laboratory or office providing the material or service, or from the responsible program office. If this office cannot be determined, inquiries regarding the appropriate contact office should be addressed to the Office, of Finance and Accounting, Product Accounting and Pricing Branch, Mail Station 4A-139, 1000 Independence Avenue, SW., Washington, DC 20585.

PART 1010 CONDUCT OF EMPLOYEES AND FORMER EMPLOYEES

Authority: 5 U.S.C. 301, 303, 7301; 5 U.S.C. App. (Ethics in Government Act); 5 U.S.C. App. (Inspector General Act of 1978); E.O. 12674, 54 FR 15159, 3 CFR, 1989 Comp., p. 215, as modified by E.O. 12731, 55 FR 42547, 3 CFR, 1990 Comp., p. 306; 5 CFR 2635.105; 18 U.S.C. 207, 208.

Source: 61 FR 35088, July 5, 1996, unless otherwise noted.

Subpart A Conduct of Employees

§ 1010.101 General.

This subpart applies to employees of the Department of Energy (DOE), excluding employees of the Federal Energy Regulatory Commission.

[61 FR 35088, July 5, 1996, as amended at 75 FR 75376, Dec. 3, 2010]

§ 1010.102 Cross-references to employee ethical conduct standards, financial disclosure regulations, and other conduct rules.

Employees of DOE are subject to the Standards of Ethical Conduct for Employees of the Executive Branch at 5 CFR part 2635, the DOE regulation at 5 CFR part 3301 which supplements the executive branch-wide standards, the executive branch-wide financial disclosure regulations at 5 CFR part 2634, the executive branch-wide financial interests regulations at 5 CFR part 2640, and the executive branch-wide employee responsibilities and conduct regulation at 5 CFR part 735.

[61 FR 35088, July 5, 1996, as amended at 63 FR 30111, June 3, 1998]

§ 1010.103 Reporting wrongdoing.

(a) Employees shall, in fulfilling the obligation of 5 CFR 2635.101(b)(11), report fraud, waste, abuse, and corruption in DOE programs, including on the part of DOE employees, contractors, subcontractors, grantees, or other recipients of DOE financial assistance, to the Office of Inspector General or other appropriate Federal authority.

(b) All alleged violations of the ethical restrictions described in section 1010.102 that are reported in accordance with (a) of this section to an appropriate authority within the Department shall in turn be referred by that authority to the designated agency ethics official or his delegatee, or the Inspector General.

§ 1010.104 Cooperation with the Inspector General.

Employees shall respond to questions truthfully under oath when required, whether orally or in writing, and must provide documents and other materials concerning matters of official interest. An employee is not required to respond to such official inquiries if answers or testimony may subject the employee to criminal prosecution.

Subpart B Procedures for Exemption of Scientific and Technological Information Communications From Post-Employment Restrictions

Source: 75 FR 75376, Dec. 3, 2010, unless otherwise noted.

§ 1010.201 Purpose and scope.

(a) This subpart sets forth criteria for the types of communications on scientific or technological matters permitted under 18 U.S.C. 207(j)(5) by defining the term “scientific or technological information.” This subpart also establishes the procedures for receiving and approving requests from former employees of the executive branch to make such communications to DOE.

(b) This subpart applies to any former employee of the executive branch subject to the post-employment conflict of interest restrictions in 18 U.S.C. 207(a), (c), and (d), who wishes to communicate with DOE under the exemption in 18 U.S.C. 207(j)(5) for the purpose of furnishing scientific or technological information to DOE offices or officials.

(c) This subpart does not apply to a former DOE employee's testimony as an expert in an adversarial proceeding in which the United States is a party or has a direct and substantial interest.

§ 1010.202 Definitions.

For purposes of this subpart:

(a) Agency designee means an individual serving in a position in DOE requiring appointment by the President of the United States with the advice and consent of the Senate.

(b) Authorized communication means any transmission of scientific or technological information to any DOE office or official that is approved by DOE under § 1010.203 of this subpart.

(c) DOE means the U.S. Department of Energy.

(d) Scientific or technological information means: Information of a scientific or technological character, such as technical or engineering information relating to the natural sciences. The exception does not extend to information associated with a nontechnical discipline such as law, economics, or political science.

(e) Incidental references or remarks. Provided the former employee's communication primarily conveys information of a scientific or technological character, the entirety of the communication will be deemed made solely for the purpose of furnishing such information notwithstanding an incidental reference or remark:

(1) Unrelated to the matter to which the post-employment restriction applies;

(2) Concerning feasibility, risk, cost, speed of implementation, or other considerations when necessary to appreciate the practical significance of the basic scientific or technological information provided; or

(3) Intended to facilitate the furnishing of scientific or technological information, such as those references or remarks necessary to determine the kind and form of information required or the adequacy of information already supplied.

§ 1010.203 Procedures for review and approval of requests.

(a) Any former employee of the executive branch subject to the constraints of the post-employment restrictions of 18 U.S.C. 207(a), (c), and (d) who wishes to communicate scientific or technological information to DOE must contact the DOE office with which the former employee wishes to communicate and request authorization to make such communication. This request must be in writing and address, in detail, information regarding each of the factors set forth in paragraphs (c)(1) through (c)(6) and (c)(8) of this section.

(b) In consultation with the Designated Agency Ethics Official (DAEO), the agency designee in the office with cognizance over the matter must advise the former employee in writing whether the proposed communication is an authorized communication. This authority cannot be delegated, except to another individual serving in a position in DOE requiring appointment by the President of the United States with the advice and consent of the Senate.

(c) In deciding whether a proposed communication is an authorized communication, the agency designee receiving the request and the DAEO must consider the following factors:

(1) Whether the former employee has relevant scientific or technical qualifications;

(2) Whether the former employee has qualifications that are otherwise unavailable to both the former employee's current employer and DOE;

(3) The nature of the scientific or technological information to be conveyed;

(4) The former employee's position prior to termination;

(5) The extent of the former employee's involvement in the matter at issue during his or her employment, including:

(i) The former employee's involvement in the same particular matter involving specific parties;

(ii) The time elapsed since the former employee's participation in such matter; and

(iii) The offices within the Federal department or agency involved in the matter both during the former employee's period of employment in the executive branch and at the time the request is being made;

(6) The existence of pending or anticipated matters before the Federal government from which the former employee or his or her current employer may financially benefit, including contract modifications, grant applications, and proposals; and

(7) Whether DOE's interests would be served by allowing the proposed communication; and

(8) Any other relevant information.

PART 1013 ADMINISTRATIVE FALSE CLAIMS AND PROCEDURES

Authority: 31 U.S.C. 3801-3812; 28 U.S.C. 2461 note.

Source: 53 FR 44385, Nov. 3, 1988, unless otherwise noted.

§ 1013.1 Basis and purpose.

(a) Basis. This part implements the Administrative False Claims Act of 2023, Public Law 118-159, div. E, title LII, section5203(j), 138 Stat. 2440-43 (Dec. 23, 2024), codified at 31 U.S.C. 3801-3812. 31 U.S.C. 3809 of the statute requires each authority head to promulgate regulations necessary to implement the provisions of the statute.

(b) Purpose. This part (1) establishes administrative procedures for imposing civil penalties and assessments against persons who make, submit, or present, or cause to be made, submitted, or presented, false, fictitious, or fraudulent claims or written statements to authorities or to their agents, and (2) specifies the hearing and appeal rights of persons subject to allegations of liability for such penalties and assessments.

[53 FR 44385, Nov. 3, 1988, as amended at 91 FR 42828, July 13, 2026]

§ 1013.2 Definitions.

ALJ means an Admininstrative Law Judge in the authority appointed pursuant to 5 U.S.C. 3105 or detailed to the authority pursuant to 5 U.S.C. 3344.

Authority means the Department of Energy.

Authority head means the Secretary or the Under Secretary of the Department of Energy.

Benefit means, in the context of “statement,” anything of value, including but not limited to any advantage, preference, privilege, license, permit, favorable decision, ruling, status, or loan guarantee.

Claim means any request, demand, or submission—

(a) Made to the authority for property, services, or money (including money representing grants, loans, insurance, or benefits);

(b) Made to a recipient of property, services, or money from the authority or to a party to a contract with the authority—

(1) For property or services if the United States—

(i) Provided such property or services;

(ii) Provided any portion of the funds for the purchase of such property or services; or

(iii) Will reimburse such recipient or party for the purchase of such property or services; or

(2) For the payment of money (including money representing grants, loans, insurance, or benefits) if the United States—

(i) Provided any portion of the money requested or demanded; or

(ii) Will reimburse such recipient or party for any portion of the money paid on such request or demand; or

(c) Made to the authority which has the effect of concealing or improperly avoiding or decreasing an obligation to pay or transmit property, services, or money to the authority.

Complaint means the administrative complaint served by the reviewing official on the defendant under § 1013.7 of this part.

Defendant means any person alleged in a complaint under § 1013.7 of this part to be liable for a civil penalty or assessment under § 1013.3 of this part.

Department means the Department of Energy.

Government means the United States Government.

Individual means a natural person.

Initial decision means the written decision of the ALJ required by § 1013.10 or § 1013.37 of this part, and includes a revised initial decision issued following a remand or a motion for reconsideration.

Investigating official means the Inspector General of the Department of Energy or an officer or employee of the Inspector General designated by the Inspector General and serving in a position for which the rate of basic pay is not less than the minimum rate of basic pay for grade GS-16 under the General Schedule.

Knows or has reason to know, means that a person, with respect to a claim or statement—

(a) Has actual knowledge that the claim or statement is false, fictitious, or fraudulent;

(b) Acts in deliberate ignorance of the truth or falsity of the claim or statement; or

(c) Acts in reckless disregard of the truth or falsity of the claim or statement.

Makes, wherever it appears, shall include the terms presents, submits, and causes to be made, presented, or submitted. As the context requires, making or made, shall likewise include the corresponding forms of such terms.

Material means having a natural tendency to influence, or be capable of influencing, the payment or receipt of money or property.

Obligation means an established duty, whether or not fixed, arising from an express or implied contractual, grantor-grantee, or licensor-licensee relationship, from a fee-based or similar relationship, from statute or regulation, or from the retention of any overpayment.

Person means any individual, partnership, corporation, association, or private organization, and includes the plural of that term.

Representative means an attorney, who is a member in good standing of the bar of any State, Territory, or possession of the United States or of the District of Columbia or the Commonwealth of Puerto Rico, and designated by a party in writing.

Reviewing official means the General Counsel of the Department or his designee who is—

(a) Not subject to supervision by, or required to report to, the investigating official;

(b) Not employed in the organizational unit of the authority in which the investigating official is employed; and

(c) Serving in a position for which the rate of basic pay is not less than the minimum rate of basic pay for grade GS-16 under the General Schedule.

Statement means any representation, certification, affirmation, document, record, or accounting or bookkeeping entry made—

(a) With respect to a claim or to obtain the approval or payment of a claim (including relating to eligibility to make a claim); or

(b) With respect to (including relating to eligibility for)—

(1) A contract with, or a bid or proposal for a contract with; or

(2) A grant, loan, or benefit from, the authority, or any State, political subdivision of a State, or other party, if the United States Government provides any poztion of the money or property under such contract or for such grant, loan, or benefit, or if the Government will reimburse such State, political subdivision, or party for any portion of the money or property under such contract or for such grant, loan, or benefit.

[53 FR 44385, Nov. 3, 1988, as amended at 91 FR 42828, July 13, 2026]

§ 1013.3 Basis for civil penalties and assessments.

(a) Claims. (1) Except as provided in paragraph (c) of this section, any person who makes a claim that the person knows or has reason to know—

(i) Is false, fictitious, or fraudulent;

(ii) Includes or is supported by any written statement which asserts a material fact which is false, fictitious, or fraudulent;

(iii) Includes or is supported by any written statement that—

(A) Omits a material fact;

(B) Is false, fictitious, or fraudulent as a result of such omission; and

(C) Is a statement in which the person making such statement has a duty to include such material fact; or

(iv) Is for payment for the provision of property or services which the person has not provided as claimed, shall be subject, in addition to any other remedy that may be prescribed by law, to a civil penalty of not more than $14,308 for each such claim.

(iv) Is for payment for the provision of property or services which the person has not provided as claimed, shall be subject, in addition to any other remedy that may be prescribed by law, to:

(A) A civil penalty of not more than $14,308 for each such claim. And

(B) Except as provided in paragraph (a)(5) of this section, such person shall also be subject to an assessment, in lieu of damages sustained by the United States because of such claim, of not more than twice the amount of such claim, or the portion of such claim, which is determined under this part to be a violation of the preceding sentence.

(2) Each voucher, invoice, claim form, or other individual request or demand for property, services, or money constitutes a separate claim.

(3) A claim shall be considered made to the authority, recipient, or party when such claim is actually made to an agent, fiscal intermediary, or other entity, including any State or political subdivision thereof, acting for or on behalf of such authority, recipient, or party.

(4) Each claim for property, services, or money is subject to a civil penalty regardless of whether such property, services, or money is actually delivered or paid.

(5)(i) If the Government has made any payment (including transferred property or provided services) on a claim, a person subject to a civil penalty under paragraph (a)(1) of this section shall also be subject to an assessment of not more than twice the amount of such claim or that portion thereof that is determined to be in violation of paragraph (a)(1) of this section. Such assessment shall be in lieu of damages sustained by the Government because of such claim. Except as provided in paragraph (a)(5)(ii) of this section, an assessment shall not be made if payment by the Government has not been made on such claim.

(ii) In the case of a claim described in § 1013.2(c), an assessment shall not be made in an amount more than double the value of the property, services, or money that was wrongfully withheld from the authority.

(b) Statements. (1) Except as provided in paragraph (c) of this section, any person who makes a written statement that—

(i) The person knows or has reason to know—

(A) Asserts a material fact which is false, fictitious, or fraudulent; or

(B) Is false, fictitious, or fraudulent because it omits a material fact that the person making the statement has a duty to include in such statement, and

(ii) Contains or is accompanied by an express certification or affirmation of the truthfulness and accuracy of the contents of the statement, shall be subject, in addition to any other remedy that may be prescribed by law, to a civil penalty of not more than $14,308 for each such statement.

(2) Each written representation, certification, or affirmation constitutes a separate statement.

(3) A statement shall be considered made to the authority when such statement is actually made to an agent, fiscal intermediary, or other entity, including any State or political subdivision thereof, acting for or on behalf of such authority.

(c) Application for certain benefits. (1) In the case of any claim or statement made by any individual relating to any of the benefits listed in paragraph (c)(2) of this section received by such individual, such individual may be held liable for penalties and assessments under this section only if such claim or statement is made by such individual in making application for such benefits with respect to such individual's eligibility to receive such benefits.

(2) For purposes of paragraph (c) of this section, the term “benefits” means benefits under part A of the Energy Conservation in Existing Buildings Act of 1976, which are intended for the personal use of the individual who receives the benefits or for a member of the individual's family.

(d) No proof of specific intent to defraud is required to establish liability under this section.

(e) In any case in which it is determined that more than one person is liable for making a claim or statement under this section, each such person may be held liable for a civil penalty under this section.

(f) In any case in which it is determined that more than one person is liable for making a claim under this section on which the Government has made payment (including transferred property or provided services), an assessment may be imposed against any such person or jointly and severally against any combination of such persons.

[53 FR 44385, Nov. 3, 1988, as amended at 62 FR 46184, Sept. 2, 1997; 74 FR 66033, Dec. 14, 2009; 79 FR 20, Jan. 2, 2014; 81 FR 41795, June 28, 2016; 81 FR 96353, Dec. 30, 2016; 83 FR 1293, Jan. 11, 2018; 83 FR 66084, Dec. 26, 2018; 85 FR 831, Jan. 8, 2020; 86 FR 2957, Jan. 14, 2021; 87 FR 1065, Jan. 10, 2022; 88 FR 2194, Jan. 13, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024; 91 FR 42848, July 13, 2026]

§ 1013.4 Investigation.

(a) If an investigating official concludes that a subpoena pursuant to the authority conferred by 31 U.S.C. 3804(a) is warranted—

(1) The subpoena so issued shall notify the person to whom it is addressed of the authority under which the subpoena is issued and shall identify the records or documents sought;

(2) The investigating official may designate a person to act on his or her behalf to receive the documents sought; and

(3) The person receiving such subpoena shall be required to tender to the investigating official or the person designated to receive the documents a certification that the documents sought have been produced, or that such documents are not available and the reasons therefor, or that such documents, suitably identified, have been withheld based upon the assertion of an identified privilege.

(b) If the investigating official concludes that an action under the Administrative False Claims Act of 2023 may be warranted, the investigating official shall submit a report containing the findings and conclusions of such investigation to the reviewing official.

(c) Nothing in this section shall preclude or limit an investigating official's discretion to refer allegations directly to the Department of Justice for suit under the False Claims Act or other civil relief, or to preclude or limit such official's discretion to defer or postpone a report or referral to the reviewing official to avoid interference with a criminal investigation or prosecution.

(d) Nothing in this section modifies any responsibility of an investigating official to report violations of criminal law to the Attorney General.

[53 FR 44385, Nov. 3, 1988, as amended at 91 FR 42849, July 13, 2026]

§ 1013.5 Review by the reviewing official.

(a) If, based on the report of the investigating official under § 1013.4(b) of this part, the reviewing official determines that there is adequate evidence to believe that a person is liable under § 1013.3 of this part, the reviewing official shall transmit to the Attorney General a written notice of the reviewing official's intention to issue a complaint under § 1013.7 of this part.

(b) Such notice shall include—

(1) A statement of the reviewing official's reasons for issuing a complaint;

(2) A statement specifying the evidence that supports the allegations of liability;

(3) A description of the claims or statements upon which the allegations of liability are based;

(4) An estimate of the amount of money or the value of property, services, or other benefits requested or demanded in violation of § 1013.3 of this part;

(5) A statement of any exculpatory or mitigating circumstances that may relate to the claims or statements known by the reviewing official or the investigating official; and

(6) A statement that there is a reasonable prospect of collecting an appropriate amount of penalties and assessments.

§ 1013.6 Prerequisites for issuing a complaint.

(a) The reviewing official may issue a complaint under § 1013.7 of this part only if—

(1) The Department of Justice approves the issuance of a complaint in a written statement described in 31 U.S.C. 3803(b)(1), and

(2) In the case of allegations of liability under § 1013.3(a) of this part with respect to a claim, the reviewing official determines that, with respect to such claim or a group of related claims submitted at the same time such claim is submitted (as defined in paragraph (b) of this section), the amount of money or the value of property or services demanded or requested in violation of § 1013.3(a) of this part does not exceed $1,000,000 .

(3) The maximum amount in paragraph (a)(2) of this section shall be adjusted for inflation in the same manner and to the same extent as civil monetary penalties under the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. 2461 note).

(b) For the purposes of this section, a related group of claims submitted at the same time shall include only those claims arising from the same transaction (e.g., grant, loan, application, or contract) that are submitted simultaneously as part of a single request, demand, or submission.

(c) Nothing in this section shall be construed to limit the reviewing official's authority to join in a single complaint against a person claims that are unrelated or were not submitted simultaneously, regardless of the amount of money, or the value of property or services, demanded or requested.

[53 FR 44385, Nov. 3, 1988, as amended at 91 FR 42849, July 13, 2026]

§ 1013.7 Complaint.

(a) On or after the date the Department of Justice approves the issuance of a complaint in accordance with 31 U.S.C. 3803(b)(1), the reviewing official may serve a complaint on the defendant, as provided in § 1013.8 of this part.

(b) The complaint shall state—

(1) The allegations of liability against the defendant, including the statutory basis for liability, an identification of the claims or statements that are the basis for the alleged liability, and the reasons why liability allegedly arises from such claims or statements;

(2) The maximum amount of penalties and assessments for which the defendant may be held liable;

(3) Instructions for filing an answer to request a hearing, including a specific statement of the defendant's right to request a hearing by filing an answer and to be represented by a representative; and

(4) That failure to file an answer within 30 days of service of the complaint will result in the imposition of the maximum amount of penalties and assessments without right to appeal, as provided in § 1013.10 of this part.

(c) At the same time the reviewing official serves the complaint, he or she shall serve the defendant with a copy of these regulations.

§ 1013.8 Service of complaint.

(a) Service of a complaint must be made by certified or registered mail or by delivery in any manner authorized by Rule 4(d) of the Federal Rules of Civil Procedure. Service is complete upon receipt.

(b) Proof of service, stating the name and address of the person on whom the complaint was served, and the manner and date of service, may be made by—

(1) Affidavit of the individual serving the complaint by delivery;

(2) A United States Postal Service return receipt card acknowledging receipt; or

(3) Written acknowledgment of receipt by the defendant or his or her representative.

§ 1013.9 Answer.

(a) The defendant may request a hearing by filing an answer with the reviewing official within 30 days of service of the complaint. An answer shall be deemed to be a request for hearing.

(b) In the answer, the defendant—

(1) Shall admit or deny each of the allegations of liability made in the complaint;

(2) Shall state any defense on which the defendant intends to rely;

(3) May state any reasons why the defendant contends that the penalties and assessments should be less than the statutory maximum; and

(4) Shall state the name, address, and telephone number of the person authorized by the defendant to act as defendant's representative, if any.

(c) If the defendant is unable to file an answer meeting the requirements of paragraph (b) of this section within the time provided, the defendant may, before the expiration of 30 days from service of the complaint, file with the reviewing official a general answer denying liability and requesting a hearing, and a request for an extension of time within which to file an answer meeting the requirements of paragraph (b) of this section. The reviewing offical shall file promptly with the ALJ the complaint, the general answer denying liability, and the request for an extension of time as provided in § 1013.11 of this part. For good cause shown, the ALJ may grant the defendant up to 30 additional days within which to file an answer meeting the requirements of paragraph (b) of this section.

§ 1013.10 Default upon failure to file an answer.

(a) If the defendant does not file an answer within the time prescribed in § 1013.9(a) of this part, the reviewing official may refer the complaint to the ALJ.

(b) Upon the referral of the complaint, the ALJ shall promptly serve on defendant in the manner prescribed in § 1013.8 of this part, a notice that an initial decision shall be issued under this section.

(c) The ALJ shall assume the facts alleged in the complaint to be true, and, if such facts establish liability under § 1013.3 of this part, the ALJ shall issue an initial decision imposing the maximum amount of penalties and assessments allowed under the statute.

(d) Except as otherwise provided in this section, by failing to file a timely answer, the defendant waives any right to further review of the penalties and assessments imposed under paragraph (c) of this section, and the initial decision shall become final and binding upon the parties 30 days after it is issued.

(e) If, before such an initial decision becomes final, the defendant files a motion with the ALJ seeking to reopen on the grounds that extraordinary circumstances prevented the defendant from filing an answer, the initial decision shall be stayed pending the ALJ's decision on the motion.

(f) If, on such motion, the defendant can demonstrate extraordinary circumstances excusing the failure to file a timely answer, the ALJ shall withdraw the initial decision in paragraph (c) of this section, if such a decision has been issued, and shall grant the defendant an opportunity to answer the complaint.

(g) A decision of the ALJ denying a defendant's motion under paragraph (e) of this section is not subject to reconsideration under § 1013.38 of this part.

(h) The defendant may appeal to the authority head the decision denying a motion to reopen by filing a notice of appeal with the authority head within 15 days after the ALJ denies the motion. The timely filing of a notice of appeal shall stay the initial decision until the authority head decides the issue.

(i) If the defendant files a timely notice of appeal with the authority head, the ALJ shall forward the record of the proceeding to the authority head.

(j) The authority head shall decide expeditiously whether extraordinary circumstances excuse the defendant's failure to file a timely answer based solely on the record before the ALJ.

(k) If the authority head decides that extraordinary circumstances excused the defendant's failure to file a timely answer, the authority head shall remand the case to the ALJ with instructions to grant the defendant an opportunity to answer.

(l) If the authority head decides that the defendant's failure to file a timely answer is not excused, the authority head shall reinstate the initial decision of the ALJ, which shall become final and binding upon the parties 30 days after the authority head issues such decision.

§ 1013.11 Referral of complaint and answer to the ALJ.

Upon receipt of an answer, the reviewing official shall file the complaint and answer with the ALJ.

§ 1013.12 Notice of hearing.

(a) When the ALJ receives the complaint and answer, the ALJ shall promptly serve a notice of hearing upon the defendant in the manner prescribed by § 1013.8 of this part. At the same time, the ALJ shall send a copy of such notice to the representative for the Government.

(b) Such notice shall include—

(1) The tentative time, date, and place, and the nature of the hearing;

(2) The legal authority and jurisdiction under which the hearing is to be held;

(3) The matters of fact and law to be asserted;

(4) A description of the procedures for the conduct of the hearing;

(5) The name, address, and telephone number of the representative of the Government and of the defendant, if any; and

(6) Such other matters as the ALJ deems appropriate.

§ 1013.13 Parties to the hearing.

(a) The parties to the hearing shall be the defendant and the authority.

(b) Pursuant to 31 U.S.C. 3730(c)(5), a private plaintiff under the False Claims Act may participate in these proceedings to the extent authorized by the provisions of that Act.

§ 1013.14 Separation of functions.

(a) The investigating official, the reviewing official, and any employee or agent of the authority who takes part in investigating, preparing, or presenting a particular case may not, in such case or a factually related case—

(1) Participate in the hearing as the ALJ;

(2) Participate or advise in the initial decision or the review of the initial decision by the authority head, except as a witness or a representative in public proceedings; or

(3) Make the collection of penalties and assessments under 31 U.S.C. 3806.

(b) The ALJ shall not be responsible to, or subject to the supervision or direction of, the investigating official or the reviewing official.

(c) Except as provided in paragraph (a) of this section, the representative for the Government may be employed anywhere in the authority, including in the offices of either the investigating official or the reviewing official.

§ 1013.15 Ex parte contacts.

No party or person (except employees of the ALJ's office) shall communicate in any way with the ALJ on any matter at issue in a case, unless on notice and opportunity for all parties to participate. This provision does not prohibit a person or party from inquiring about the status of a case or asking routine questions concerning administrative functions or procedures.

§ 1013.16 Disqualification of reviewing official or ALJ.

(a) A reviewing official or ALJ in a particular case may disqualify himself or herself at any time.

(b) A party may file with the ALJ a motion for disqualification of a reviewing official or an ALJ. Such motion shall be accompanied by an affidavit alleging personal bias or other reason for disqualification.

(c) Such motion and affidavit shall be filed promptly upon the party's discovery of reasons requiring disqualification, or such objections shall be deemed waived.

(d) Such affidavit shall state specific facts that support the party's belief that personal basis or other reason for disqualification exists and the time and circumstances of the party's discovery of such facts. It shall be accompanied by a certificate of the representative of record that it is made in good faith.

(e) Upon the filing of such a motion and affidavit, the ALJ shall proceed no further in the case until he or she resolves the matter of disqualification in accordance with paragraph (f) of this section.

(f)(1) If the ALJ determines that a reviewing official is disqualified, the ALJ shall dismiss the complaint without prejudice.

(2) If the ALJ disqualifies himself or herself, the case shall be reassigned promptly to another ALJ.

(3) If the ALJ denies a motion to disqualify, the authority head may determine the matter only as part of his or her review or the initial decision upon appeal, if any.

§ 1013.17 Rights of parties.

Except as otherwise limited by this part, all parties may—

(a) Be accompanied, represented, and advised by a representative;

(b) Participate in any conference held by the ALJ;

(c) Conduct discovery;

(d) Agree to stipulations of fact or law, which shall be made part of the record;

(e) Present evidence relevant to the issues at the hearing;

(f) Present and cross-examine witnesses;

(g) Present oral arguments at the hearing as permitted by the ALJ; and

(h) Submit written briefs and proposed findings of fact and conclusions of law.

§ 1013.18 Authority of the ALJ.

(a) The ALJ shall conduct a fair and impartial hearing, avoid delay, maintain order, and assure that a record of the proceeding is made.

(b) The ALJ has the authority to—

(1) Set and change the date, time, and place of the hearing upon reasonable notice to the parties;

(2) Continue or recess the hearing in whole or in part for a reasonable period of time;

(3) Hold conferences to identify or simplify the issues, or to consider other matters that may aid in the expeditious disposition of the proceeding;

(4) Administer oaths and affirmations;

(5) Issue subpoenas requiring the attendance of witnesses and the production of documents at depositions or at hearings;

(6) Rule on motions and other procedural matters;

(7) Regulate the scope and timing of discovery;

(8) Regulate the course of the hearing and the conduct of representatives and parties;

(9) Examine witnesses;

(10) Receive, rule on, exclude, or limit evidence;

(11) Upon motion of a party, take official notice of facts; decide cases, in whole or in part, by summary judgment where there is no disputed issue of material fact;

(12) Conduct any conference, argument, or hearing on motions in person or by telephone; and

(13) Exercise such other authority as is necessary to carry out the responsibilities of the ALJ under this part.

(c) The ALJ does not have the authority to find Federal statutes or regulations invalid.

§ 1013.19 Prehearing conferences.

(a) The ALJ may schedule prehearing conferences as appropriate.

(b) Upon the motion of any party, the ALJ shall schedule at least one prehearing conference at a reasonable time in advance of the hearing.

(c) The ALJ may use prehearing conferences to discuss the following:

(1) Simplification of the issues;

(2) The necessity or desirability of amendments to the pleadings, including the need for a more definite statement;

(3) Stipulations and admissions of fact or as to the contents and authenticity of documents;

(4) Whether the parties can agree to submission of the case on a stipulated record;

(5) Whether a party chooses to waive appearance at an oral hearing and to submit only documentary evidence (subject to the objection of other parties) and written argument;

(6) Limitation of the number of witnesses);

(7) Scheduling dates for the exchange of witness lists and of proposed exhibits;

(8) Discovery;

(9) The time, date, and place for the hearing; and

(10) Such other matters as may tend to expedite the fair and just disposition of the proceedings.

(d) The ALJ may issue an order containing all matters agreed upon by the parties or ordered by the ALJ at a prehearing conference.

§ 1013.20 Disclosure of documents.

(a) Upon written request to the reviewing official, the defendant may review any relevant and material documents, transcripts, records, and other materials that relate to the allegations set out in the complaint and upon which the findings and conclusions of the investigating official under § 1013.4(b) are based, unless such documents are subject to a privilege under Federal law. Upon payment of fees for duplication, the defendant may obtain copies of such documents.

(b) Upon written request to the reviewing official, the defendant also may obtain a copy of all exculpatory information in the possession of the reviewing official or investigating official relating to the allegations in the complaint, even if it is contained in a document that would otherwise be privileged. If the document would otherwise be privileged, only that portion containing exculpatory information must be disclosed.

(c) The notice sent to the Attorney General from the reviewing official as described in § 1013.5 of the part is not discoverable under any circumstances.

(d) The defendant may file a motion to compel disclosure of the documents subject to the provisions of this section. Such a motion may only be filed with the ALJ following the filing of an answer pursuant to § 1013.9 of this part.

§ 1013.21 Discovery.

(a) The following types of discovery are authorized:

(1) Requests for production of documents for inspection and copying;

(2) Requests for admissions of the authenticity of any relevant document or of the truth of any relevant fact;

(3) Written interrogatories; and

(4) Depositions.

(b) For the purpose of this section and §§ 1013.22 and 1013.23 of this part, the term “documents” includes information, documents, reports, answers, records, accounts, papers, and other data and documentary evidence. Nothing contained herein shall be interpreted to require the creation of a document.

(c) Unless mutually agreed to by the parties, discovery is available only as ordered by the ALJ. The ALJ shall regulate the timing of discovery.

(d) Motions for discovery. (1) A party seeking discovery may file a motion with the ALJ. Such a motion shall be accompanied by a copy of the requested discovery, or in the case of depositions, a summary of the scope of the proposed deposition.

(2) Within ten days of service, a party may file an opposition to the motion and/or a motion for protective order as provided in § 1013.24 of this part.

(3) The ALJ may grant a motion for discovery only if he or she finds that the discovery sought—

(i) Is necessary for the expeditious, fair, and reasonable consideration of the issues;

(ii) Is not unduly costly or burdensome;

(iii) Will not unduly delay the proceeding; and

(iv) Does not seek privileged information.

(4) The burden of showing that discovery should be allowed is on the party seeking discovery.

(5) The ALJ may grant discovery subject to a protective order under § 1013.24 of this part.

(e) Depositions. (1) If a motion for deposition is granted, the ALJ shall issue a subpoena for the deponent, which may require the deponent to produce documents. The subpoena shall specify the time, date, and place at which the deposition will be held.

(2) The party seeking to depose shall serve the subpoena in the manner prescribed in § 1013.8 of this part.

(3) The deponent may file with the ALJ a motion to quash the subpoena or a motion for a protective order within ten days of service.

(4) The party seeking to depose shall provide for the taking of a verbatim transcript of the deposition, which it shall make available to all other parties for inspection and copying.

(f) Each party shall bear its own costs of discovery.

§ 1013.22 Exchange of witness lists, statements and exhibits.

(a) At least 15 days before the hearing or at such other time as may be ordered by the ALJ, the parties shall exchange witness lists, copies of prior statements of proposed witnesses, and copies of proposed hearing exhibits, including copies of any written statements that the party intends to offer in lieu of live testimony in accordance with § 1013.33(b) of this part. At the time the above documents are exchanged, any party that intends to rely on the transcript of deposition testimony in lieu of live testimony at the hearing, if permitted by the ALJ, shall provide each party with a copy of the specific pages of the transcript it intends to introduce into evidence.

(b) If a party objects, the ALJ shall not admit into evidence the testimony of any witness whose name does not appear on the witness list or any exhibit not provided to the opposing party as provided above unless the ALJ finds good cause for the failure or that there is no prejudice to the objecting party.

(c) Unless another party objects within the time set by the ALJ, documents exchanged in accordance with paragraph (a) of this section shall be deemed to be authentic for the purpose of admissibility at the hearing.

§ 1013.23 Subpoenas for attendance at hearing.

(a) A party wishing to procure the appearance and testimony of any individual at the hearing may request that the ALJ issue a subpoena.

(b) A subpoena requiring the attendance and testimony of an individual may also require the individual to produce documents at the hearing.

(c) A party seeking a subpoena shall file a written request therefor not less than 15 days before the date fixed for the hearing unless otherwise allowed by the ALJ for good cause shown. Such request shall specify any documents to be produced and shall designate the witnesses and describe the address and location thereof with sufficient particularity to permit such witnesses to be found.

(d) The subpoena shall specify the time, date, and place at which the witness is to appear and any documents the witness is to produce.

(e) The party seeking the subpoena shall serve it in the manner prescribed in § 1013.8 of this part. A subpoena on a party or upon an individual under the control of a party may be served by first class mail.

(f) A party or the individual to whom the subpoena is directed may file with the ALJ a motion to quash the subpoena within ten days after service or on or before the time specified in the subpoena for compliance if it is less than ten days after service.

§ 1013.24 Protective order.

(a) A party or a prospective witness or deponent may file a motion for a protective order with respect to discovery sought by an opposing party or with respect to the hearing, seeking to limit the availability or disclosure of evidence.

(b) In issuing a protective order, the ALJ may make any order which justice requires to protect a party or person from annoyance, embarrassment, oppression, or undue burden or expense, including one or more of the following:

(1) That the discovery not be had;

(2) That the discovery may be had only on specified terms and conditions, including a designation of the time or place;

(3) That the discovery may be had only through a method of discovery other than that requested;

(4) That certain matters not be inquired into, or that the scope of discovery be limited to certain matters;

(5) That discovery be conducted with no one present except persons designated by the ALJ;

(6) That the contents of discovery or evidence be sealed;

(7) That a deposition after being sealed be opened only by order of the ALJ;

(8) That a trade secret or other confidential research, development, commercial information, or facts pertaining to any criminal investigation, proceeding, or other administrative investigation not be disclosed or be disclosed only in a designated way; or

(9) That the parties simultaneously file specified documents or information enclosed in sealed envelopes to be opened as directed by the ALJ.

§ 1013.25 Witness fees.

The party requesting a subpoena shall pay the cost of the fees and mileage of any witness subpoenaed in the amounts that would be payable to a witness in a proceeding in United States District Court. A check for witness fees and mileage shall accompany the subpoena when served, except that when a subpoena is issued on behalf of the authority, a check for witness fees and mileage need not accompany the subpoena.

§ 1013.26 Form, filing and service of papers.

(a) Form. (1) Documents filed with the ALJ shall include an original and two copies.

(2) Every pleading and paper filed in the proceeding shall contain a caption setting forth the title of the action, the case number assigned by the ALJ, and a designation of the paper (e.g., motion to quash subpoena).

(3) Every pleading and paper shall be signed by, and shall contain the address and telephone number of the party or the person on whose behalf the paper was filed, or his or her representative.

(4) Papers are considered filed when they are mailed. Date of mailing may be established by a certificate from the party or its representative or by proof that the document was sent by certified or registered mail.

(b) Service. A party filing a document with the ALJ shall, at the time of filing, serve a copy of such document on every other party. Service upon any party of any document other than those required to be served as prescribed in § 1013.8 of this part shall be made by delivering a copy or by placing a copy of the document in the United States mail, postage prepaid, and addressed to the party's last known address. When a party is represented by a representative, service shall be made upon such representative in lieu of the actual party.

(c) Proof of service. A certificate by the individual serving the document by personal delivery or by mail, setting forth the manner of service, shall be proof of service.

§ 1013.27 Computation of time.

(a) In computing any period of time under this part or in an order issued thereunder, the time begins with the day following the act, event, or default, and includes the last day of the period, unless it is a Saturday, Sunday, or legal holiday observed by the Federal government, in which event it includes the next business day.

(b) When the period of time allowed is less than seven days, intermediate Saturday, Sundays, and legal holidays observed by the Federal government shall be excluded from the computation.

(c) Where a document has been served or issued by placing it in the mail, an additional five days will be added to the time permitted for any response.

§ 1013.28 Motions.

(a) Any application to the ALJ for an order or ruling shall be by motion. Motions shall state the relief sought, the authority relied upon, and the facts alleged, and shall be filed with the ALJ and served on all other parties.

(b) Except for motions made during a prehearing conference or at the hearing, all motions shall be in writing. The ALJ may require that oral motions be reduced to writing.

(c) Within 15 days after a written motion is served, or such other time as may be fixed by the ALJ, any party may file a response to such motion.

(d) The ALJ may not grant a written motion before the time for filing responses thereto has expired, except upon consent of the parties or following a hearing on the motion, but may overrule or deny such motion without awaiting a response.

(e) The ALJ shall make a reasonable effort to dispose of all outstanding motions prior to the beginning of the hearing.

§ 1013.29 Sanctions.

(a) The ALJ may sanction a person, including any party or representative, for—

(1) Failing to comply with an order, rule, or procedure governing the proceeding;

(2) Failing to prosecute or defend an action; or

(3) Engaging in other misconduct that interferes with the speedy, orderly, or fair conduct of the hearing.

(b) Any such sanction, including but not limited to those listed in paragraphs (c), (d), and (e) of this section, shall reasonably relate to the severity and nature of the failure or misconduct.

(c) When a party fails to comply with an order, including an order for taking a deposition, the production of evidence within the party's control, or a request for admission, the ALJ may—

(1) Draw an inference in favor of the requesting party with regard to the information sought;

(2) In the case of requests for admission, deem each matter of which an admission is requested to be admitted;

(3) Prohibit the party failing to comply with such order from introducing evidence concerning, or otherwise relying upon, testimony relating to the information sought; and

(4) Strike any part of the pleadings or other submissions of the party failing to comply with such request.

(d) If a party fails to prosecute or defend an action under this part commenced by service of a notice of hearing, the ALJ may dismiss the action or may issue an initial decision imposing penalties and assessments.

(e) The ALJ may refuse to consider any motion, request, response, brief or other document which is not filed in a timely fashion.

§ 1013.30 The hearing and burden of proof.

(a) The ALJ shall conduct a hearing on the record in order to determine whether the defendant is liable for a civil penalty or assessment under § 1013.3 of this part, and, if so, the appropriate amount of any such civil penalty or assessment considering any aggravating or mitigating factors.

(b) The authority shall prove defendant's liability and any aggravating factors by a preponderance of the evidence.

(c) The defendant shall prove any affirmative defenses and any mitigating factors by a preponderance of the evidence.

(d) The hearing shall be open to the public unless otherwise ordered by the ALJ for good cause shown.

§ 1013.31 Determining the amount of penalties and assessments.

(a) In determining an appropriate amount of civil penalties and assessments, the ALJ and the authority head, upon appeal, should evaluate any circumstances that mitigate or aggravate the violation and should articulate in their opinions the reasons that support the penalties and assessments they impose. Because of the intangible costs of fraud, the expense of investigating such conduct, and the need to deter others who might be similarly tempted, ordinarily double damages and a significant civil penalty should be imposed.

(b) Although not exhaustive, the following factors are among those that may influence the ALJ and the authority head in determining the amount of penalties and assessments to impose with respect to the misconduct (i.e., the false, fictitious, or fraudulent claims or statement) charged in the complaint:

(1) The number of false, fictitious, or fraudulent claims or statements;

(2) The time period over which such claims or statements were made;

(3) The degree of the defendant's culpability with respect to the misconduct;

(4) The amount of money or the value of the property, services, or benefit falsely claimed;

(5) The value of the Government's actual loss as a result of the misconduct, including foreseeable consequential damages and the costs of investigation;

(6) The relationship of the amount imposed as civil penalties to the amount of the Government's loss;

(7) The potential or actual impact of the misconduct upon national defense, public health or safety, or public confidence in the management of Government programs and operations, including particularly the impact on the intended beneficiaries of such programs;

(8) Whether the defendant has engaged in a pattern of the same or similar misconduct;

(9) Whether the defendant attempted to conceal the misconduct;

(10) The degree to which the defendant has involved others in the misconduct or in concealing it;

(11) Where the misconduct of employees or agents is imputed to the defendant, the extent to which the defendant's practices fostered or attempted to preclude such misconduct;

(12) Whether the defendant cooperated in or obstructed an investigation of the misconduct;

(13) Whether the defendant assisted in identifying and prosecuting other wrongdoers;

(14) The complexity of the program or transaction, and the degree of the defendant's sophistication with respect to it, including the extent of the defendant's prior participation in the program or in similar transactions;

(15) Whether the defendant has been found, in any criminal, civil, or administrative proceeding to have engaged in similar misconduct or to have dealt dishonestly with the Government of the United States or of a State, directly or indirectly; and

(16) The need to deter the defendant and others from engaging in the same or similar misconduct.

(c) Nothing in this section shall be construed to limit the ALJ or the authority head from considering any other factors that in any given case may mitigate or aggravate the offense for which penalties and assessments are imposed.

§ 1013.32 Location of hearing.

(a) The hearing may be held—

(1) In any judicial district of the United States in which the defendant resides or transacts business;

(2) In any judicial district of the United States in which the claim or statement in issue was made; or

(3) In such other place as may be agreed upon by the defendant and the ALJ.

(b) Each party shall have the opportunity to present argument with respect to the location of the hearing.

(c) The hearing shall be held at the place and at the time ordered by the ALJ.

§ 1013.33 Witnesses.

(a) Except as provided in paragraph (b) of this section, testimony at the hearing shall be given orally by witnesses under oath or affirmation.

(b) At the discretion of the ALJ, testimony may be admitted in the form of a written statement or deposition. Any such written statement must be provided to all other parties along with the last known address of such witness, in a manner which allows sufficient time for other parties to subpoena such witness for cross-examination at the hearing. Prior written statements of witnesses proposed to testify at the hearing and deposition transcripts shall be exchanged as provided in § 1013.22(a) of this part.

(c) The ALJ shall exercise reasonable control over the mode and order of interrogating witnesses and presenting evidence so as to (1) make the interrogation and presentation effective for the ascertainment of the truth, (2) avoid needless consumption of time, and (3) protect witnesses from harassment or undue embarrassment.

(d) The ALJ shall permit the parties to conduct such cross-examination as may be required for a full and true disclosure of the facts.

(e) At the discretion of the ALJ, a witness may be cross-examined on matters relevant to the proceeding without regard to the scope of his or her direct examination. To the extent permitted by the ALJ, cross-examination on matters outside the scope of direct examination shall be conducted in the manner of direct examination and may proceed by leading questions only if the witness is a hostile witness, an adverse party, or a witness identified with an adverse party.

(f) Upon motion of any party, the ALJ shall order witnesses excluded so that they cannot hear the testimony of other witnesses. This rule does not authorize exclusion of—

(1) A party who is an individual;

(2) In the case of a party that is not an individual, an officer or employee of the party appearing for the entity pro se or designated by the party's representative; or

(3) An individual whose presence is shown by a party to be essential to the presentation of its case, including an individual employed by the Government engaged in assisting the representative for the Government.

§ 1013.34 Evidence.

(a) The ALJ shall determine the admissibility of evidence.

(b) Except as provided in this part, the ALJ shall not be bound by the Federal Rules of Evidence. However, the ALJ may apply the Federal Rules of Evidence where appropriate, e.g., to exclude unreliable evidence.

(c) The ALJ shall exclude irrelevant and immaterial evidence.

(d) Although relevant, evidence may be excluded if its probative value is substantially outweighed by the danger of unfair prejudice, confusion of the issues, or by considerations of undue delay or needless presentation of cumulative evidence.

(e) Although relevant, evidence may be excluded if it is privileged under Federal law.

(f) Evidence concerning offers of compromise or settlement shall be inadmissible to the extent provided in Rule 408 of the Federal Rules of Evidence.

(g) The ALJ shall permit the parties to introduce rebuttal witnesses and evidence.

(h) All documents and other evidence offered or taken for the record shall be open to examination by all parties, unless otherwise ordered by the ALJ pursuant to § 1013.24 of this part.

§ 1013.35 The record.

(a) The hearing will be recorded and transcribed. Transcripts may be obtained following the hearing from the ALJ at a cost not to exceed the actual cost of duplication.

(b) The transcript of testimony, exhibits and other evidence admitted at the hearing, and all papers and requests filed in the proceeding constitute the record for the decision by the ALJ and the authority head.

(c) The record may be inspected and copied (upon payment of a reasonable fee) by anyone, unless otherwise ordered by the ALJ pursuant to § 1013.24 of this part.

§ 1013.36 Post-hearing briefs.

The ALJ may require the parties to file post-hearing briefs. In any event, any party may file a post-hearing brief. The ALJ shall fix the time for filing such briefs, not to exceed 60 days from the date the parties receive the transcript of the hearing or, if applicable, the stipulated record. Such briefs may be accompanied by proposed findings of fact and conclusions of law. The ALJ may permit the parties to file reply briefs.

§ 1013.37 Initial decision.

(a) The ALJ shall issue an initial decision based only on the record, which shall contain findings of fact, conclusions of law, and the amount of any penalties and assessments imposed.

(b) The findings of fact shall include a finding on each of the following issues:

(1) Whether the claims or statements identified in the complaint, or any portions thereof, violate § 1013.3 of this part;

(2) If the person is liable for penalties or assessments, the appropriate amount of any such penalties or assessments considering any mitigating or aggravating factors that he or she finds in the case, such as those described in § 1013.31 of this part.

(c) The ALJ shall promptly serve the initial decision on all parties within 90 days after the time for submission of post-hearing briefs and reply briefs (if permitted) has expired. The ALJ shall at the same time serve all parties with a statement describing the right of any defendant determined to be liable for a civil penalty or assessment to file a motion for reconsideration with the ALJ or a notice of appeal with the authority head. If the ALJ fails to meet the deadline contained in this paragraph, he or she shall notify the parties of the reason for the delay and shall set a new deadline.

(d) Unless the initial decision of the ALJ is timely appealed to the authority head, or a motion for reconsideration of the initial decision is timely filed, the initial decision shall constitute the final decision of the authority head and shall be final and binding on the parties 30 days after it is issued by the ALJ.

§ 1013.38 Reconsideration of initial decision.

(a) Except as provided in paragraph (d) of this section, any party may file a motion for reconsideration of the initial decision within 20 days of receipt of the initial decision. If service was made by mail, receipt will be presumed to be five days from the date of mailing in the absence of contrary proof.

(b) Every such motion must set forth the matters claimed to have been erroneously decided and the nature of the alleged errors. Such motion shall be accompanied by a supporting brief.

(c) Responses to such motions shall be allowed only upon request of the ALJ.

(d) No party may file a motion for reconsideration of an initial decision that has been revised in response to a previous motion for reconsideration.

(e) The ALJ may dispose of a motion for reconsideration by denying it or by issuing a revised initial decision.

(f) If the ALJ denies a motion for reconsideration, the initial decision shall constitute the final decision of the authority head and shall be final and binding on the parties 30 days after the ALJ denies the motion, unless the initial decision is timely appealed to the authority head in accordance with § 1013.39.

(g) If the ALJ issues a revised initial decision, that decision shall constitute the final decision of the authority head and shall be final and binding on the parties 30 days after it is issued, unless it is timely appealed to the authority head in accordance with § 1013.39 of this part.

§ 1013.39 Appeal to authority head.

(a) Any defendant who has filed a timely answer and who is determined in an initial decision to be liable for a civil penalty or assessment may appeal such decision to the authority head by filing a notice of appeal with the authority head in accordance with this section.

(b)(1) A notice of appeal may be filed at any time within 30 days after the ALJ issues an initial decision. However, if any party files a motion for reconsideration under § 1013.38 of this part, consideration of the appeal shall be stayed automatically pending resolution of the motion for reconsideration.

(2) If a motion for reconsideration is timely filed, a notice of appeal may be filed within 30 days after the ALJ denies the motion or issues a revised initial decision, whichever applies.

(3) The authority head may extend the initial 30-day period for an additional 30 days if the defendant files with the authority head a request for an extension within the initial 30-day period and shows good cause.

(c) If the defendant files a timely notice of appeal with the authority head and the time for filing motions for reconsideration under § 1013.38 of this part has expired, the ALJ shall forward the record of the proceeding to the authority head.

(d) A notice of appeal shall be accompanied by a written brief specifying exceptions to the initial decision and reasons supporting the exceptions.

(e) The representative for the Government may file a brief in opposition to exceptions within 30 days of receiving the notice of appeal and accompanying brief.

(f) There is no right to appear personally before the authority head.

(g) There is no right to appeal any interlocutory ruling by the ALJ.

(h) In reviewing the initial decision, the authority head shall not consider any objection that was not raised before the ALJ unless a demonstration is made of extraordinary circumstances causing the failure to raise the objection.

(i) If any party demonstrates to the satisfaction of the authority head that additional evidence not presented at such hearing is material and that there were reasonable grounds for the failure to present such evidence at such hearing, the authority head shall remand the matter to the ALJ for consideration of such additional evidence.

(j) The authority head may affirm, reduce, reverse, compromise, remand, or settle any penalty or assessment determined by the ALJ in any initial decision.

(k) The authority head shall promptly serve each party to the appeal with a copy of the decision of the authority head and a statement describing the right of any person determined to be liable for a penalty or an assessment to seek judicial review.

(l) Unless a petition for review is filed as provided in 31 U.S.C. 3805 after a defendant has exhausted all administrative remedies under this part and within 60 days after the date on which the authority head serves the defendant with a copy of the authority head's decision, a determination that a defendant is liable under § 1013.3 of this part is final and is not subject to judicial review.

§ 1013.40 Stays ordered by the Department of Justice.

If at any time the Attorney General or an Assistant Attorney General designated by the Attorney General transmits to the authority head a written finding that continuation of the administrative process described in this part with respect to a claim or statement may adversely affect any pending or potential criminal or civil action related to such claim or statement, the authority head shall stay the process immediately. The authority head may order the process resumed only upon receipt of the written authorization of the Attorney General.

§ 1013.41 Stay pending appeal.

(a) An initial decision is stayed automatically pending disposition of a motion for reconsideration or of an appeal to the authority head.

(b) No administrative stay is available following a final decision of the authority head.

§ 1013.42 Judicial review.

Section 3805 of title 31, United States Code, authorizes judicial review by an appropriate United States District Court of a final decision of the authority head imposing penalties or assessments under this part and specifies the procedures for such review.

§ 1013.43 Collection of civil penalties and assessments.

Sections 3806 and 3808(b) of title 31, United States Code, authorizes actions for collection of civil penalties and assessments imposed under this part and specify the procedures for such actions.

§ 1013.44 Right to administrative offset.

The amount of any penalty or assessment which has become final, or for which a judgment has been entered under § 1013.42 or § 1013.43 of this part, or any amount agreed upon in a compromise or settlement under § 1013.46 of this part, may be collected by administrative offset under 31 U.S.C. 3716, except that an administrative offset may not be made under this subsection against a refund of an overpayment of Federal taxes, then or later owing by the United States to the defendant.

§ 1013.45 Deposit in Treasury of United States.

All amounts collected pursuant to this part shall be deposited in accordance with 31 U.S.C. 3806(g).

[91 FR 42849, July 13, 2026]

§ 1013.46 Compromise or settlement.

(a) Parties may make offers of compromise or settlement at any time.

(b)(1) The reviewing official has the exclusive authority to compromise or settle a case under this part at any time after the date on which the reviewing official is permitted to issue a complaint and before the date on which the ALJ issues an initial decision.

(2) A reviewing official shall notify the Attorney General in writing not later than 30 days before entering into any agreement to compromise or settle a case under this part and before the date on which the reviewing official is permitted to refer allegations of liability to the ALJ under 31 U.S.C. 3803(b).

(c) The authority head has exclusive authority to compromise or settle a case under this part at any time after the date on which the ALJ issues an initial decision, except during the pendency of any review under § 1013.42 of this part or during the pendency of any action to collect penalties and assessments under § 1013.43 of this part.

(d) The Attorney General has exclusive authority to compromise or settle a case under this part during the pendency of any review under § 1013.42 of this part or of any action to recover penalties and assessments under 31 U.S.C. 3806.

(e) The investigating official may recommend settlement terms to the reviewing official, the authority head, or the Attorney General, as appropriate. The reviewing official may recommend settlement terms to the authority head, or the Attorney General, as appropriate.

(f) Any compromise or settlement must be in writing.

[53 FR 44385, Nov. 3, 1988, as amended at 91 FR 42849, July 13, 2026]

§ 1013.47 Limitations.

(a) A notice to the person alleged to be liable with respect to a claim or statement shall be mailed or delivered in accordance with § 1013.8 of this part not later than the later of—

(1) 6 years after the date on which the violation of § 1013.3 is committed; or

(2) 3 years after the date on which facts material to the action are known or reasonably should have been known by the authority head, but in no event more than 10 years after the date on which the violation is committed.

(b) If the defendant fails to file a timely answer, service of notice under § 1013.10(b) of this part shall be deemed a notice of a hearing for purposes of this section.

(c) The statute of limitations may be extended by agreement of the parties.

[53 FR 44385, Nov. 3, 1988, as amended at 91 FR 42849, July 13, 2026]

PART 1014 ADMINISTRATIVE CLAIMS UNDER FEDERAL TORT CLAIMS ACT

Authority: Sec. 1(a), 80 Stat. 306, (28 U.S.C. 2672); 28 CFR part 14; sec. 644, Pub. L. 95-91, 91 Stat. 599, (42 U.S.C. 7254).

Source: 45 FR 7768, Feb. 4, 1980, unless otherwise noted.

§ 1014.1 Scope of regulations.

(a) These regulations shall apply only to claims asserted under the Federal Tort Claims Act, as amended, accruing on or after January 18, 1967, for money damages against the United States for injury to, or loss of, property or personal injury or death caused by the negligent or wrongful act or omission of any employee of the Department of Energy (DOE) while acting within the scope of office or employment.

(b) The terms DOE, Department, and Department of Energy as used in this part mean the agency established by the Department of Energy Organization Act (Pub. L. 95-91), 42 U.S.C. 7101, et seq., including the Federal Energy Regulatory Commission, but do not include any contractor of the Department.

(c) The regulations in this part supplement the Attorney General's regulations in part 14 of chapter 1 of title 28 CFR as amended. Those regulations, including subsequent amendments thereto, and the regulations in this part apply to the consideration by DOE of administrative claims under the Federal Tort Claims Act.

§ 1014.2 Administrative claim; when presented; appropriate office.

(a) For purposes of these regulations, a claim shall be deemed to have been presented when DOE receives, at a place designated in paragraph (b) of this section, an executed Standard Form 95 or other written notification of an incident, accompanied by a claim for money damages in a definite amount for injury to or loss of property, personal injury, or death, that is alleged to have occurred by reason of the incident. A claim that should have been presented to DOE but which was mistakenly addressed to or filed with another Federal agency, shall be deemed to be presented to DOE on the date the claim is received by DOE. A claim mistakenly addressed to or filed with DOE shall be transferred to the appropriate Federal agency, if ascertainable, or returned to the claimant.

(b) Claims should be mailed in envelopes marked “Attention Office of General Counsel.” Claims shall be mailed or delivered to the DOE installation or office employing the person or persons whose acts or omissions are alleged to have caused the loss, damage, or injury, unless the claimant does not know that address. If the proper address is unknown, claims may be mailed or delivered to: The General Counsel, U.S. Department of Energy, Washington, DC 20585. Forms may be obtained from the same places.

(c) A claim may be amended by the claimant at any time before final DOE action or before the exercise of the claimant's option under 28 U.S.C. 2675(a). Amendments shall be submitted in writing and signed by the claimant or a duly authorized agent or legal representative. If an amendment to a pending claim is filed in time, the DOE shall have 6 months to decide the claim as amended. The claimant's option under 28 U.S.C. 2675(a) shall not accrue until 6 months after the filing of an amendment.

§ 1014.3 Administrative claim; who may file.

(a) A claim for injury to or loss of property may be presented by the owner of the property interest that is the subject of the claim or the owner's duly authorized agent or legal representative.

(b) A claim for personal injury may be presented by the injured person or the claimant's duly authorized agent or legal representative.

(c) A claim based on death may be presented by the executor or administrator of the decedent's estate or by any other person legally entitled to assert such a claim under the applicable State law.

(d) A claim for a loss that was wholly compensated by an insurer with the rights of a subrogee may be presented by the insurer. A claim for loss that was partially compensated by an insurer with the rights of a subrogee may be presented by the insurer or the insured individually, as their respective interests appear, or jointly. Whenever an insurer presents a claim asserting the rights of a subrogee, it shall present with its claim appropriate evidence that it has the rights of a subrogee.

(e) A claim presented by an agent or legal representative shall be presented in the name of the claimant, be signed by the agent or legal representative, show the title or legal capacity of the person signing, and be accompanied by evidence of authority to present a claim on behalf of the claimant.

§ 1014.4 Administrative claims; evidence and information to be submitted.

(a) Death. In support of a claim based on death, the claimant may be required to submit the following evidence or information:

(1) An authenticated death certificate or other competent evidence showing the cause of death, the date of death, and the age of the decedent.

(2) Decedent's employment or occupation at time of death, including monthly or yearly salary or earnings (if any), and the duration of last employment or occupation.

(3) Full names, addresses, birth dates, kinship, and marital status of the decedent's survivors, including identification of those survivors who were dependent for support upon the decedent at the time of death.

(4) The degree of support afforded by the decedent to each survivor dependent upon decedent for support at the time of death.

(5) Decedent's general physical and mental condition before death.

(6) Itemized bills for medical and burial expenses incurred by reason of the incident causing death, or itemized receipts of payment for such expenses.

(7) If damages for pain and suffering prior to death are claimed, a physican's detailed statement specifying the injuries suffered, the duration of pain and suffering, any drugs administered for pain, and the decedent's physical condition between injury and death.

(8) Any other evidence or information that may have a bearing on either the responsibility of the United States for the death or the amount of damages claimed.

(b) Personal injury. In support of a claim for personal injury, including pain and suffering, the claimant may be required to submit the following evidence or information:

(1) A written report by the attending physician or dentist setting forth the nature and extent of the injury, the nature and extent of treatment, any degree of temporary or permanent disability, the prognosis, the period of hospitalization, and any diminished earning capacity. In addition, the claimant may be required to submit to a physical or mental examination by a physician employed by the DOE or another Federal agency. A copy of the physician's report shall be made available to the claimant upon the claimant's written request, provided that the claimant has, upon request, made or agrees to make available to the DOE any physician's reports previously or thereafter made of the physical or mental condition which is the subject matter of the claim.

(2) Itemized bills for medical, dental, and hospital expenses incurred, or itemized receipts of payment for such expenses.

(3) If the prognosis reveals that future treatment will be needed, a statement of the expected expenses of such treatment.

(4) If a claim is made for loss of time from employment, a written statement from the claimant's employer showing actual time lost from employment, whether the claimant is a full-time or part-time employee, and the wages or salary actually lost.

(5) If a claim is made for loss of income and the claimant is self-employed, documentary evidence showing the amounts of earnings actually lost.

(6) Any other evidence or information that may bear on either the responsibility of the United States for the personal injury or the damages claimed.

(c) Property damage. In support of a claim for injury to or loss of property, real or personal, the claimant may be required to submit the following evidence or information:

(1) Proof of ownership of the property interest that is the subject of the claim.

(2) A detailed statement of the amount claimed with respect to each item of property.

(3) An itemized receipt of payment for necessary repairs or itemized written estimates of the cost of such repairs.

(4) A statement listing date of purchase, purchase price, and salvage value, where repair is not economical.

(5) Any other evidence or information that may bear on either the responsibility of the United States for the injury to or loss of property or the damages claimed.

§ 1014.5 Authority to adjust, determine, compromise, and settle.

The General Counsel, the Deputy General Counsel, the Deputy General Counsel for Legal Services, the Assistant General Counsel for Legal Counsel, and any employees of the Department designated by the General Counsel to receive and act on tort claims at Headquarters and field locations are authorized to act on claims.

§ 1014.6 Limitation on authority.

(a) An award, compromise, or settlement of a claim in excess of $25,000 shall be made only with the prior written approval of the Attorney General or his or her designee. For the purposes of this paragraph, a principal claim and any derivative or subrogated claim shall be treated as a single claim.

(b) An administrative claim may be adjusted, determined, compromised, or settled only after the Department of Justice has been consulted if, in the opinion of the General Counsel or designee:

(1) A new precedent may be involved;

(2) A question of policy may be involved;

(3) The United States may be entitled to indemnity or contribution from a third party and the DOE is unable to adjust the third party claim; or

(4) The compromise of a particular claim, as a practical matter, may control the disposition of a related claim in which the amount to be paid may exceed $25,000.

(c) An administrative claim may be adjusted, determined, compromised, or settled only after consultation with the Department of Justice when the DOE is aware that the United States or an employee, agent, or cost-type contractor of the United States is involved in litagation based on a claim arising out of the same incident or transaction.

(d) The authority of DOE subordinate claims officials to make awards, compromises, and settlements of over $10,000 is subject to the approval of the General Counsel, the Deputy General Counsel, or the Deputy General Counsel for Legal Services.

§ 1014.7 Referral to Department of Justice.

(a) When Department of Justice approval or consultation is required under § 1014.6, the referral or request shall be transmitted to the Department of Justice by the General Counsel or designee.

(b) When a designee of the General Counsel is processing a claim requiring consultation with, or approval of, either the DOE General Counsel or the Department of Justice, the referral or request shall be sent to the General Counsel in writing and shall contain:

(1) A short and concise statement of the facts and of the reasons for the referral or request,

(2) Copies of relevant portions of the claim file, and

(3) A statement of recommendations or views.

§ 1014.8 Investigation and examination.

The DOE may investigate, or may request any other Federal agency to investigate, a claim and may conduct, or request another Federal agency to conduct, a physical examination of a claimant and provide a report of the physical examination.

§ 1014.9 Final denial of claim.

(a) Final denial of an administrative claim shall be in writing and sent to the claimant, or the claimant's attorney or legal representative by certified or registered mail. The notification of final denial may include a statement of the reasons for the denial and shall include a statement that, if the claimant is dissatisfied with the Department's action, the claimant may file suit in an appropriate U.S. District Court not more than 6 months after the notification is mailed.

(b) Before the commencement of suit and before the 6-month period provided in 28 U.S.C. 2401(b) expires, a claimant, or the claimant's duly authorized agent, or legal representative, may file a written request with the DOE General Counsel for reconsideration of a final denial of a claim. Upon the timely filing of a request for reconsideration the DOE shall have 6 months from the date of filing to decide the claim, and the claimant's option under 28 U.S.C. 2675(a) shall not accrue until 6 months after the request for reconsideration is filed. Final DOE action on a request for reconsideration shall be made in accordance with the provisions of paragraph (a) of this section.

§ 1014.10 Action on approved claims.

(a) Payment of any approved claim shall not be made unless the claimant executes (1) a Standard Form 1145, (2) a claims settlement agreement, or (3) a Standard Form 95, as appropriate consistent with applicable rules of the Department of Justice, Department of the Treasury, and the General Accounting Office. When a claimant is represented by an attorney, the voucher for payment shall designate both the claimant and the attorney as payees, and the check shall be delivered to the attorney, whose address shall appear on the voucher.

(b) If the claimant or the claimant's agent or legal representative accepts any award, compromise, or settlement made pursuant to the provisions of section 2672 or 2677 of title 28, United States Code, that acceptance shall be final and conclusive on the claimant, the claimant's agent or legal representative, and any other person on whose behalf or for whose benefit the claim has been presented. The acceptance shall constitute a complete release of any claim against the United States and against any employee of the Government whose act or omission gave rise to the claim, by reason of the same subject matter.

§ 1014.11 Penalties.

A person who files a false claim or makes a false or fraudulent statement in a claim against the United States may be liable to a fine of not more than $10,000 or to imprisonment for not more than 5 years, or both (18 U.S.C. 1001), and, in addtion, to a forfeiture of $2,000 and a penalty of double the loss or damage sustained by the United States (31 U.S.C 231).

PART 1015 COLLECTION OF CLAIMS OWED THE UNITED STATES

Authority: 31 U.S.C. 3701, 3711, 3716, 3717, 3718, and 3720B; 42 U.S.C. 2201 and 7101, et seq.; 50 U.S.C. 2401 et seq.

Source: 68 FR 48533, Aug. 14, 2003, unless otherwise noted.

Subpart A General

§ 1015.100 Scope.

This subpart describes the scope of the standards set forth in this part. This subpart corresponds to 31 CFR part 900 in the Department of the Treasury (Treasury) Federal Claims Collection Standards.

§ 1015.101 Prescription of standards.

(a) The Secretary of the Treasury and the Attorney General of the United States issued regulations in 31 CFR parts 900-904, under the authority contained in 31 U.S.C. 3711(d)(2). Those regulations prescribe standards for Federal agency use in the administrative collection, offset, compromise, and the suspension or termination of collection activity for civil claims for money, funds, or property, as defined by 31 U.S.C. 3701(b), unless specific Federal agency statutes or regulations apply to such activities or, as provided for by Title 11 of the United States Code, when the claims involve bankruptcy. The regulations in 31 CFR parts 900-904 also prescribe standards for referring debts to the Department of Justice (DOJ) for litigation. Additional guidance is contained in the Office of Management and Budget's (OMB) Circular A-129 (Revised), “Policies for Federal Credit Programs and Non-Tax Receivables,” the Treasury's “Managing Federal Receivables,” and other publications concerning debt collection and debt management. These publications are available from the Department of Energy (DOE) Office of Financial Policy, 1000 Independence Ave., SW., Washington, DC 20585.

(b) Additional rules governing centralized administrative offset and the transfer of delinquent debt to Treasury or Treasury-designated debt collection centers for collection (cross-servicing) under the Debt Collection Improvement Act of 1996 (DCIA), Public Law 104-134, 110 Stat. 1321, 1358 (April 26, 1996), are set forth in separate regulations issued by Treasury. Rules governing the use of certain debt collection tools created under the DCIA, such as administrative wage garnishment, also are set forth in separate regulations issued by Treasury. See generally, 31 CFR part 285.

(c) DOE is not limited to the remedies contained in this part and may use any other authorized remedies, including alternative dispute resolution and arbitration, to collect civil claims, to the extent that such remedies are not inconsistent with the Federal Claims Collection Act, as amended, Public Law 89-508, 80 Stat. 308 (July 19, 1966), the Debt Collection Act of 1982, Public Law 97-365, 96 Stat. 1749 (October 25, 1982), the DCIA or other relevant law. The regulations in this part do not impair DOE's common law rights to collect debts.

(d) Standards and policies regarding the classification of debt for accounting purposes (for example, write-off of uncollectible debt) are contained in OMB's Circular A-129 (Revised), “Policies for Federal Credit Programs and Non-Tax Receivables.”

§ 1015.102 Definitions and construction.

(a) For the purposes of the standards in this part, the terms “claim” and “debt” are synonymous and interchangeable. They refer to an amount of money, funds, or property that has been determined by an agency official to be due the United States from any person, organization, or entity, except another Federal agency. For the purposes of administrative offset under 31 U.S.C. 3716, the terms “claim” and “debt” include an amount of money, funds, or property owed by a person to a State (including past-due support being enforced by a State), the District of Columbia, American Samoa, Guam, the United States Virgin Islands, the Commonwealth of the Northern Mariana Islands, or the Commonwealth of Puerto Rico.

(b) A debt is “delinquent” if it has not been paid by the date specified in DOE's initial written demand for payment or applicable agreement or instrument (including a post-delinquency payment agreement), unless other satisfactory payment arrangements have been made.

(c) In this part, words in the plural form shall include the singular and vice versa, and words signifying the masculine gender shall include the feminine and vice versa. The terms “includes” and “including” do not exclude matters not listed but do include matters that are in the same general class.

(d) Recoupment is a special method for adjusting debts arising under the same transaction or occurrence. For example, obligations arising under the same contract generally are subject to recoupment.

(e) The term “Department of Energy” or “DOE” includes the National Nuclear Security Administration.

§ 1015.103 Antitrust, fraud, tax, interagency, transportation account audit, acquisition contract, and financial assistance instrument claims excluded.

(a) The standards in this part relating to compromise, suspension, and termination of collection activity do not apply to any debt based in whole or in part on conduct in violation of the antitrust laws or to any debt involving fraud, the presentation of a false claim, or misrepresentation on the part of the debtor or any party having an interest in the claim. Only the DOJ has the authority to compromise, suspend, or terminate collection activity on such claims. The standards in this part relating to the administrative collection of claims do apply, but only to the extent authorized by the DOJ in a particular case. Upon identification of a claim based in whole or in part on conduct in violation of the antitrust laws or any claim involving fraud, the presentation of a false claim, or misrepresentation on the part of the debtor or any party having an interest in the claim, DOE will promptly refer the case to the DOJ for action. At its discretion, the DOJ may return the claim to DOE for further handling in accordance with the standards in this part.

(b) Part 1015 does not apply to tax debts.

(c) Part 1015 does not apply to claims between Federal agencies. Federal agencies should attempt to resolve interagency claims by negotiation in accordance with Executive Order 12146 (3 CFR, 1980 Comp., pp. 409-412).

(d) Part 1015 does not apply to claims arising from the audit of transportation accounts pursuant to 31 U.S.C. 3726 which shall be determined, collected, compromised, terminated, or settled in accordance with regulations published under the authority of 31 U.S.C. 3726 (see 41 CFR parts 101-141, administered by the Director, Office of Transportation Audits, General Services Administration) and are otherwise excepted from these regulations.

(e)(1) Part 1015 does not apply to claims arising out of acquisition contracts, subcontracts, and purchase orders which are subject to the Federal Acquisition Regulations System, including the Federal Acquisition Regulation, 48 CFR subpart 32.6, and the Department of Energy Acquisition Regulation, 48 CFR subpart 932.6, and which shall be determined or settled in accordance with those regulations; and

(2) Part 1015 does not apply to claims arising out of financial assistance instruments (e.g., grants, cooperative agreements, and contracts under cooperative agreements) and loans and loan guarantees, which shall be determined or settled in accordance with 10 CFR 600.26 and 10 CFR 600.112(f).

§ 1015.104 Compromise, waiver, or disposition under other statutes not precluded.

Nothing in this part precludes DOE from disposing of any claim under statutes and implementing regulations other than subchapter II of chapter 37 of Title 31 of the United States Code (Claims of the United States Government) and the standards in this part. In such cases, the specifically applicable laws and regulations will generally take precedence over this part.

§ 1015.105 Form of payment.

Claims may be paid in the form of money or, when a contractual basis exists, the Government may demand the return of specific property or the performance of specific services.

§ 1015.106 Subdivision of claims not authorized.

Debts may not be subdivided to avoid the monetary ceiling established by 31 U.S.C. 3711(a)(2). A debtor's liability arising from a particular transaction or contract shall be considered a single debt in determining whether the debt is one of less than $100,000 (excluding interest, penalties, and administrative costs) or such higher amount as the Attorney General shall from time to time prescribe for purposes of compromise or suspension or termination of collection activity.

§ 1015.107 Required administrative proceedings.

DOE is not required to omit, foreclose, or duplicate administrative proceedings required by contract or other laws or regulations.

§ 1015.108 No private rights created.

The standards in this part do not create any right or benefit, substantive or procedural, enforceable at law or in equity by a party against the United States, its agencies, its officers, or any other person, nor shall the failure of DOE, Treasury, the DOJ or other agency to comply with any of the provisions of this part be available to any debtor as a defense.

Subpart B Standards for the Administrative Collection of Claims

§ 1015.200 Scope.

The subpart sets forth the standards for administrative collection of claims under this part. This subpart corresponds to 31 CFR part 901 of the Treasury Federal Claims Collection Standards.

§ 1015.201 Aggressive agency collection activity.

(a) Heads of DOE Headquarters Elements and Field Elements or their designees must promptly notify the appropriate DOE finance office of claims arising from their operations. A claim will be recorded and controlled by the responsible finance office upon receipt of documentation from a competent authority establishing the amount due.

(b) In accordance with 31 CFR Chapter IX parts 900-904 and this part, DOE will aggressively collect all debts arising out of activities. Collection activities shall be undertaken promptly with follow-up action taken as necessary.

(c) Debts referred or transferred to Treasury, or Treasury-designated debt collection centers under the authority of 31 U.S.C. 3711(g), shall be serviced, collected, or compromised, or the collection action will be suspended or terminated, in accordance with the statutory requirements and authorities applicable to the collection of such debts.

(d) DOE will cooperate with other agencies in its debt collection activities.

(e) DOE will refer debts to Treasury as soon as due process requirements are complete, and should refer such debts no later than 180 days after the debt has become delinquent. On behalf of DOE, Treasury will take appropriate action to collect or compromise the referred debt, or to suspend or terminate collection action thereon, in accordance with the statutory and regulatory requirements and authorities applicable to the debt and action. Appropriate action to collect a debt may include referral to another debt collection center, a private collection contractor, or the DOJ for litigation. (See 31 CFR 285.12, Transfer of Debts to Treasury for Collection.) This requirement does not apply to any debt that:

(1) Is in litigation or foreclosure;

(2) Will be disposed of under an approved asset sale program;

(3) Has been referred to a private collection contractor for a period of time acceptable to Treasury; or

(4) Will be collected under internal offset procedures within three years after the debt first became delinquent.

(f) Treasury is authorized to charge a fee for services rendered regarding referred or transferred debts. DOE will add the fee to the debt as an administrative cost (see § 1015.212(c)).

§ 1015.202 Demand for payment.

(a) Written demand as described in paragraph (b) of this section will be made promptly upon a debtor of the United States in terms that inform the debtor of the consequences of failing to cooperate with DOE to resolve the debt. Generally, one demand letter issued 30 days after the initial notice, bill, or written demand should suffice. When necessary to protect the Government's interest (for example, to prevent the running of a statute of limitations), written demand may be preceded by other appropriate actions under this Part, including immediate referral for litigation.

(b) Demand letters will inform the debtor of:

(1) The basis for the indebtedness and the rights, if any, the debtor may have to seek review within DOE;

(2) The applicable standards for imposing any interest, penalties, or administrative costs;

(3) The date by which payment should be made to avoid late charges (i.e., interest, penalties, and administrative costs) and enforced collection, which generally should not be more than 30 days from the date that the demand letter is mailed or hand-delivered;

(4) The name, address, and phone number of a contact person or office within DOE;

(5) DOE's intent to refer unpaid debts to Treasury for collection;

(6) DOE's intent to authorize Treasury to add fees for services rendered as an administrative fee;

(7) DOE's intent to authorize Treasury to utilize collection tools such as credit bureau reporting, private collection agencies, administrative wage garnishment, Federal salary offset, tax refund offset, administrative offset, litigation, and other tools, as appropriate, to collect the debt;

(8) DOE's willingness to discuss alternative methods of payment;

(9) The debtor's entitlement to consideration of a waiver, depending on applicable statutory authority; and

(10) DOE's intent to suspend or revoke licenses, permits, or privileges for any inexcusable or willful failure of a debtor to pay such a debt in accordance with DOE regulations or governing procedures.

(c) DOE will seek to ensure that demand letters are mailed or hand-delivered on the same day that they are dated.

(d) DOE will seek to respond promptly to communications from debtors, within 30 days whenever feasible, and will advise debtors who dispute debts to furnish available evidence to support their contentions.

(e) Prior to the initiation of the demand process or at any time during or after completion of the demand process, if DOE determines to pursue, or is required to pursue, offset, the procedures applicable to offset should be followed (see § 1015.203 of this subpart). The availability of funds or money for debt satisfaction by offset and DOE's determination to pursue collection by offset shall release DOE from the necessity of further compliance with paragraphs (a), (b), and (c) of this section.

(f) Prior to referring a debt for litigation, DOE should advise each person determined to be liable for the debt that, unless the debt can be collected administratively, litigation may be initiated. This notification should comply with Executive Order 12988 (3 CFR, 1996 Comp, pp. 157-163) and should be given as part of a demand letter under paragraph (b) of this section.

(g) When DOE learns that a bankruptcy petition has been filed with respect to a debtor, before proceeding with further collection action, DOE should immediately seek legal advice from appropriate legal counsel concerning the impact of the Bankruptcy Code on any pending or contemplated collection activities. Unless counsel determines that the automatic stay imposed at the time of filing pursuant to 11 U.S.C. 362 has been lifted or is no longer in effect, in most cases collection activity against the debtor should stop immediately.

(1) After seeking legal advice, a proof of claim should be filed in most cases with the bankruptcy court or the Trustee. DOE will refer to the provisions of 11 U.S.C. 106 relating to the consequences on sovereign immunity of filing a proof of claim.

(2) If DOE is a secured creditor, it may seek relief from the automatic stay regarding its security, subject to the provisions and requirements of 11 U.S.C. 362.

(3) Offset is stayed in most cases by the automatic stay. However, DOE will seek legal advice from counsel to determine whether its payments to the debtor and payments of other agencies available for offset may be frozen until relief from the automatic stay can be obtained from the bankruptcy court. DOE also will seek legal advice from counsel to determine whether recoupment is available.

§ 1015.203 Collection by administrative offset.

(a) Scope. (1) The term “administrative offset” has the meaning provided in 31 U.S.C. 3701(a)(1).

(2) This section does not apply to:

(i) Debts arising under the Social Security Act (42 U.S.C. 301, et. seq.) except as provided in 42 U.S.C. 404;

(ii) Payments made under the Social Security Act (42 U.S.C. 301, et. seq.) except as provided for in 31 U.S.C. 3716(c) (see 31 CFR 285.4, Federal Benefit Offset);

(iii) Debts arising under, or payments made under, the Internal Revenue Code (see 31 CFR 285.2, Tax Refund Offset) or the tariff laws of the United States;

(iv) Offsets against Federal salaries to the extent these standards are inconsistent with regulations published to implement such offsets under 5 U.S.C. 5514 and 31 U.S.C. 3716 (see 5 CFR part 550, subpart K, and 31 CFR 285.7, Federal Salary Offset);

(v) Offsets under 31 U.S.C. 3728 against a judgment obtained by a debtor against the United States;

(vi) Offsets or recoupments under common law, state law, or Federal statutes specifically prohibiting offsets or recoupments of particular types of debts; or

(vii) Offsets in the course of judicial proceedings, including bankruptcy.

(3) Unless otherwise provided for by contract or law, debts or payments that are not subject to administrative offset under 31 U.S.C. 3716 may be collected by administrative offset under the common law or other applicable statutory authority.

(4) Unless otherwise provided by law, administrative offset of payments under the authority of 31 U.S.C. 3716 to collect a debt may not be conducted more than 10 years after the Government's right to collect the debt first accrued, unless facts material to the Government's right to collect the debt were not known and could not reasonably have been known by the official or officials of the Government who were charged with the responsibility to discover and collect such debts. This limitation does not apply to debts reduced to a judgment.

(5) In bankruptcy cases, DOE will seek legal advice from appropriate legal counsel concerning the impact of the Bankruptcy Code, particularly 11 U.S.C. 106, 362, and 553, on pending or contemplated collections by offset.

(b) Mandatory centralized administrative offset. (1) As described in § 1015.201(e), under the DCIA, DOE is required to refer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). Administrative offset is one type of collection tool used by Treasury to collect debts referred under 31 CFR 285.12. Thus, by transferring debts to Treasury, DOE will satisfy the requirement to notify Treasury of debts for the purposes of administrative offset and duplicate referrals are not required. A debt, which is not transferred to Treasury for purposes of debt collection, however, may be subject to the DCIA requirement of notification to Treasury for purposes of administrative offset.

(2) The names and taxpayer identifying numbers (TINs) of debtors who owe debts referred to Treasury as described in paragraph (b)(1) of this section shall be compared to the names and TINs on payments to be made by Federal disbursing officials. Federal disbursing officials include disbursing officials of Treasury, the Department of Defense, the United States Postal Service, other Government corporations, and disbursing officials of the United States designated by the Secretary of the Treasury. When the name and TIN of a debtor match the name and TIN of a payee and all other requirements for offset have been met, the payment will be offset to satisfy the debt.

(3) Treasury will notify the debtor/payee in writing that an offset has occurred to satisfy, in part or in full, a past due, legally enforceable delinquent debt. The notice shall include a description of the type and amount of the payment from which the offset was taken, the amount of offset that was taken, the identity of DOE as the creditor agency requesting the offset, and a contact point within DOE who will respond to questions regarding the offset.

(4) As required in 31 CFR 901.3(b)(4), DOE will refer a delinquent debt to Treasury for administrative offset, only after the debtor:

(i) Has been sent written notice of the type and amount of the debt, the intention of DOE to use administrative offset to collect the debt, and an explanation of the debtor's rights under 31 U.S.C. 3716; and

(ii) Has been given:

(A) The opportunity to inspect and copy DOE records related to the debt;

(B) The opportunity for a review within DOE of the determination of indebtedness; and

(C) The opportunity to make a written agreement to repay the debt.

(iii) DOE may omit the procedures set forth in paragraph (a)(4) of this section when:

(A) The offset is in the nature of a recoupment;

(B) The debt arises under a contract as set forth in Cecile Industries, Inc. v. Cheney, 995 F.2d 1052 (Fed. Cir. 1993) (notice and other procedural protections set forth in 31 U.S.C. 3716(a) do not supplant or restrict established procedures for contractual offsets accommodated by the Contracts Disputes Act); or

(C) In the case of non-centralized administrative offsets conducted under paragraph (c) of this section, DOE first learns of the existence of the amount owed by the debtor when there is insufficient time before payment would be made to the debtor/payee to allow for prior notice and an opportunity for review. When prior notice and an opportunity for review are omitted, DOE shall give the debtor such notice and an opportunity for review as soon as practicable and shall promptly refund any money ultimately found not to have been owed to the Government.

(iv) When DOE previously has given a debtor any of the required notice and review opportunities with respect to a particular debt (see § 1015.202), DOE need not duplicate such notice and review opportunities before administrative offset may be initiated.

(5) When DOE refers delinquent debts to Treasury, DOE must certify, in a form acceptable to Treasury, that:

(i) The debt(s) is (are) past due and legally enforceable; and

(ii) DOE has complied with all due process requirements under 31 U.S.C. 3716(a) and DOE regulations.

(6) Payments that are prohibited by law from being offset are exempt from centralized administrative offset. Treasury may exempt classes of DOE payments from centralized offset upon the written request of the Secretary of DOE.

(7) In accordance with 31 U.S.C. 3716(f), Treasury may waive the provisions of the Computer Matching and Privacy Protection Act of 1988 concerning matching agreements and post-match notification and verification (5 U.S.C. 552a(o) and (p)) for centralized administrative offset upon receipt of a certification from DOE that the due process requirements enumerated in 31 U.S.C. 3716(a) have been met. The certification of a debt in accordance with paragraph (b)(5) of this section will satisfy this requirement. If such a waiver is granted, only the Data Integrity Board of Treasury is required to oversee any matching activities, in accordance with 31 U.S.C. 3716(g). This waiver authority does not apply to offsets conducted under paragraphs (c) and (d) of this section.

(c) Non-centralized administrative offset. (1) Generally, non-centralized administrative offsets are ad hoc case-by-case offsets that DOE conducts, at DOE's discretion, internally or in cooperation with the agency certifying or authorizing payments to the debtor. Unless otherwise prohibited by law, when centralized administrative offset is not available or appropriate, past due, legally enforceable non-tax delinquent debts may be collected through non-centralized administrative offset. In these cases, DOE may make a request directly to a payment-authorizing agency to offset a payment due a debtor to collect a delinquent debt. For example, it may be appropriate for DOE to request that the Office of Personnel Management (OPM) offset a Federal employee's lump sum payment upon leaving Government service to satisfy an unpaid advance.

(2) DOE shall comply with offset requests by creditor agencies to collect debts owed to the United States, unless the offset would not be in the best interest of the United States with respect to the program of DOE, or would otherwise be contrary to law. Appropriate use will be made of the cooperative efforts of other agencies in effecting collection by administrative offset.

(3) When collecting multiple debts by non-centralized administrative offset, DOE generally will apply the recovered amounts to those debts in accordance with the best interests of the United States, as determined by the facts and circumstances of the particular case, particularly the applicable statute of limitations.

(d) Requests to OPM to offset a debtor's anticipated or future benefit payments under the Civil Service Retirement and Disability Fund. Upon providing OPM written certification that a debtor has been afforded the procedures provided in paragraph (b)(4) of this section, DOE may request OPM to offset a debtor's anticipated or future benefit payments under the Civil Service Retirement and Disability Fund (Fund) in accordance with regulations codified at 5 CFR 831.1801-831.1808. Upon receipt of such a request, OPM will identify and “flag” a debtor's account in anticipation of the time when the debtor requests, or becomes eligible to receive, payments from the Fund. This will satisfy any requirement that offset be initiated prior to the expiration of the time limitations referenced in paragraph (a)(4) of this section.

(e) Review requirements. (1) For purposes of this section, whenever DOE is required to afford a debtor a review within the agency, DOE shall provide the debtor with a reasonable opportunity for an oral hearing when the debtor requests reconsideration of the debt and DOE determines that the question of the indebtedness cannot be resolved by review of the documentary evidence, for example, when the validity of the debt turns on an issue of credibility or veracity.

(2) Unless otherwise required by law, an oral hearing under this section is not required to be a formal evidentiary hearing, although DOE will carefully document all significant matters discussed at the hearing.

(3) This section does not require an oral hearing with respect to debt collection systems in which a determination of indebtedness rarely involves issues of credibility or veracity and DOE has determined that review of the written record is ordinarily an adequate means to correct prior mistakes.

(4) In those cases when an oral hearing is not required by this section, DOE will accord the debtor a “paper hearing,” that is, a determination of the request for reconsideration based upon a review of the written record.

§ 1015.204 Reporting debts.

(a) DOE may disclose delinquent debts to consumer reporting agencies in accordance with 31 U.S.C. 3711(e), the DCIA, the revised Federal Claims Collection Standards (31 CFR parts 900-904) published November 22, 2000, and other applicable authorities. DOE will ensure that all of the rights and protections afforded to the debtor under 31 U.S.C. 3711(e) have been fulfilled. Additional guidance is contained in Treasury's “Guide to the Federal Credit Bureau Program,” revised October 2001.

(b) As described in § 1015.201(e), under the DCIA (31 U.S.C. 3711(g)), DOE is required to transfer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). As part of its regular debt collection procedures, Treasury will report debts it is collecting to the appropriate designated credit reporting agencies on behalf of DOE. A debt not transferred to Treasury for purposes of debt collection, however, may be subject to the DCIA requirement to report all non-tax delinquent consumer debts to credit reporting agencies.

§ 1015.205 Credit reports.

(a) In order to aid DOE in making appropriate determinations as to the collection and compromise of claims; the collection of interest, penalties, and administrative costs; and the likelihood of collecting the claim, DOE may institute a credit investigation of the debtor at any time following receipt of knowledge of the claim.

(b) As described in § 1015.201(e), under the DCIA (31 U.S.C. 3711(g)), DOE is required to transfer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). As part of its regular debt collection procedures, Treasury may also institute a credit investigation of the debtor on behalf of DOE.

§ 1015.206 Contracting with private collection contractors and with entities that locate and recover unclaimed assets.

(a) DOE may contract with private collection contractors in accordance with 31 U.S.C. 3718(d), the DCIA, the revised Federal Claims Collection Standards (31 CFR parts 900-904) published November 22, 2000, and other applicable authorities.

(b) As described in § 1015.201(e), under the DCIA, DOE is required to transfer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing) under 31 U.S.C. 3711(g). As part of its regular debt collection procedures, Treasury may refer delinquent debts to private collection contractors on behalf of DOE.

(c) DOE may enter into contracts for locating and recovering assets of the United States, such as unclaimed assets. DOE must establish procedures acceptable to Treasury before entering into contracts to recover assets of the United States held by a state government or a financial institution.

(d) DOE may enter into contracts for debtor asset and income search reports. In accordance with 31 U.S.C. 3718(d), such contracts may provide that the fee a contractor charges DOE for such services may be payable from the amounts recovered, unless otherwise prohibited by statute.

§ 1015.207 Suspension or revocation of eligibility for loans and loan guaranties, licenses, permits, or privileges.

(a) Unless waived by the Secretary of DOE or his designee, DOE may not extend financial assistance in the form of a loan, loan guarantee, or loan insurance to any person who DOE knows to be delinquent on a non-tax debt owed to a Federal agency. This prohibition does not apply to disaster loans. The authority to waive the application of this section may be delegated to the Chief Financial Officer and redelegated only to the Deputy Chief Financial Officer of DOE. DOE may extend credit after the delinquency has been resolved. See 31 CFR 285.13 (Barring Delinquent Debtors From Obtaining Federal Loans or Loan Insurance or Guarantees).

(b) In non-bankruptcy cases, DOE offices seeking the collection of statutory penalties, forfeitures, or other types of claims should consider the suspension or revocation of licenses, permits, or other privileges for any inexcusable or willful failure of a debtor to pay such a debt in accordance with DOE's regulations or governing procedures. The debtor should be advised in DOE's written demand for payment of DOE's ability to suspend or revoke licenses, permits, or privileges. Any DOE office making, guaranteeing, insuring, acquiring, or participating in loans should consider suspending or disqualifying any lender, contractor, or broker from doing further business with DOE or engaging in programs sponsored by DOE if such lender, contractor, or broker fails to pay its debts to the Government within a reasonable time or if such lender, contractor, or broker has been suspended, debarred, or disqualified from participation in a program or activity by another Federal agency. The failure of any surety to honor its obligations in accordance with 31 U.S.C. 9305 should be reported to Treasury. Treasury will forward to all interested agencies notification that a surety's certificate of authority to do business with the Government has been revoked by Treasury.

(c) The suspension or revocation of licenses, permits, or privileges also should extend to Federal programs or activities that are administered by the states on behalf of the Federal Government, to the extent that they affect the Federal Government's ability to collect money or funds owed by debtors. Therefore, states that manage Federal activities, pursuant to approval from DOE, should ensure that appropriate steps are taken to safeguard against issuing licenses, permits, or privileges to debtors who fail to pay their debts to the Federal Government.

(d) In bankruptcy cases, before advising the debtor of DOE's intention to suspend or revoke licenses, permits, or privileges, DOE will seek legal advice from counsel concerning the impact of the Bankruptcy Code, particularly 11 U.S.C. 362 and 525, which may restrict such action.

§ 1015.208 Administrative wage garnishment.

(a) DOE may use administrative wage garnishment to collect money from a debtor's disposable pay to satisfy delinquent debt in accordance with section 31001(o) of the DCIA, codified at 31 U.S.C. 3720D. Treasury has issued regulations implementing the administrative wage garnishment provisions contained in the DCIA, at 31 CFR 285.11. DOE has adopted these regulations in their entirety.

(b) As described in § 1015.201(e) of this part, under the DCIA (31 U.S.C. 3711(g)), DOE is required to transfer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). As part of its regular debt collection procedures, Treasury may use administrative wage garnishment on behalf of DOE.

§ 1015.209 Tax refund offset.

(a) DOE may authorize the Internal Revenue Service (IRS) to offset a tax refund to satisfy delinquent debt in accordance with 31 U.S.C. 3720A, Reduction of Tax Refund by Amount of Debt. Treasury has issued regulations implementing the tax refund offset as part of Treasury's mandatory centralized offset at 31 CFR 285.2, Offset of Tax Refund to Collect Past-Due, Legally Enforceable Non-tax Debt. DOE has adopted 31 U.S.C. 3720A and 31 CFR 285.2 in their entirety. The due process requirements of 31 U.S.C. 3720A are contained in §§ 1015.203(b)(4), and 1015.203(e) of this part.

(b) As described in § 1015.201(e) of this part, under the DCIA (31 U.S.C. 3711(g)), DOE is required to transfer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). As part of its regular debt collection procedures, Treasury may use tax refund offset on behalf of DOE.

§ 1015.210 Liquidation of collateral.

(a) DOE may liquidate security or collateral through the exercise of a power of sale in the security instrument or a nonjudicial foreclosure, and apply the proceeds to the applicable debt(s), if the debtor fails to pay the debt(s) within a reasonable time after demand and if such action is in the best interest of the United States. Collection from other sources, including liquidation of security or collateral, is not a prerequisite to requiring payment by a surety, insurer, or guarantor unless such action is expressly required by statute or contract.

(b) When DOE learns that a bankruptcy petition has been filed with respect to a debtor, DOE will seek legal advice from counsel concerning the impact of the Bankruptcy Code, including, but not limited to, 11 U.S.C. 362, to determine the applicability of the automatic stay and the procedures for obtaining relief from such stay prior to proceeding under paragraph (a) of this section.

§ 1015.211 Collection in installments.

(a) Whenever feasible, DOE shall collect the total amount of a debt in one lump sum. If a debtor is financially unable to pay a debt in one lump sum, DOE may accept payment in regular installments. DOE will obtain a current financial statement showing the debtor's assets, liabilities, income, and expenses from debtors who represent that they are unable to pay in one lump sum, and independently verify such representations whenever possible. DOE may also obtain credit reports or other financial information to assess installment requests. DOE may use its own financial information form or a DOJ form, such as the Financial Statement of Debtor (OBD-500) (see § 1015.302(g) of this part). When DOE agrees to accept payments in regular installments, it will obtain a legally enforceable, written agreement from the debtor that specifies all of the terms of the arrangement and that contains a provision accelerating the debt in the event of default.

(b) The size and frequency of installment payments should bear a reasonable relation to the size of the debt and the debtor's ability to pay. If possible, the installment payments should be sufficient in size and frequency to liquidate the debt in three years or less.

(c) Security for deferred payments should be obtained in appropriate cases. DOE may accept installment payments notwithstanding the refusal of the debtor to execute a written agreement or to give security, at DOE's option.

§ 1015.212 Interest, penalties and administrative costs.

(a) Except as provided in paragraphs (g), (h), and (i) of this section, DOE shall charge interest, penalties and administrative costs on debts owed to the United States pursuant to 31 U.S.C. 3717. DOE shall mail or hand-deliver a written notice to the debtor, at the debtor's most recent address available to DOE, explaining DOE's requirements concerning these charges except where these requirements are included in a contractual or repayment agreement. These charges shall continue to accrue until the debt is paid in full or otherwise resolved through compromise, termination, or waiver of the charges.

(b) DOE shall charge interest on debts owed the United States as follows:

(1) Interest shall accrue from the date of delinquency, or as otherwise provided by law.

(2) Unless otherwise established in a contract, repayment agreement, or by statute, the rate of interest charged shall be the rate established annually by Treasury in accordance with 31 U.S.C. 3717. Pursuant to 31 U.S.C 3717, DOE may charge a higher rate of interest if it reasonably determines that a higher rate is necessary to protect the rights of the United States. DOE will document the reason(s) for its determination that the higher rate is necessary.

(3) The rate of interest, as initially charged, shall remain fixed for the duration of the indebtedness. When a debtor defaults on a repayment agreement and seeks to enter into a new agreement, DOE may require payment of interest at a new rate that reflects the current value of funds to the Treasury at the time the new agreement is executed. Interest shall not be compounded, that is, interest shall not be charged on interest, penalties, or administrative costs required by this section. If, however, a debtor defaults on a previous repayment agreement, charges that accrued but were not collected under the defaulted agreement shall be added to the principal under the new repayment agreement.

(c) DOE shall assess administrative costs incurred for processing and handling delinquent debts. The calculation of administrative costs should be based on actual costs incurred or upon estimated costs as determined by the assessing office.

(d) Unless otherwise established in a contract, repayment agreement, or by statute, DOE shall charge a penalty, pursuant to 31 U.S.C. 3717(e)(2), not to exceed six percent a year on the amount due on a debt that is delinquent for more than 90 days. This charge shall accrue from the date of delinquency.

(e) DOE may increase an “administrative debt” by the cost of living adjustment in lieu of charging interest and penalties under this section. “Administrative debt” includes, but is not limited to, a debt based on fines, penalties, and overpayments, but does not include a debt based on the extension of Government credit, such as those arising from loans and loan guaranties. The cost of living adjustment is the percentage by which the Consumer Price Index for the month of June of the calendar year preceding the adjustment exceeds the Consumer Price Index for the month of June of the calendar year in which the debt was determined or last adjusted. Increases to administrative debts shall be computed annually. DOE will use this alternative only when there is a legitimate reason to do so, such as when calculating interest and penalties on a debt would be extremely difficult because of the age of the debt.

(f) When a debt is paid in partial or installment payments, amounts received by DOE shall be applied first to outstanding penalties, second to administrative costs, third to interest, and last to principal.

(g) DOE shall waive the collection of interest and administrative costs imposed pursuant to this section on the portion of the debt that is paid within 30 days after the date on which interest began to accrue. DOE may extend this 30-day period on a case-by-case basis. In addition, DOE may waive interest, penalties, and administrative costs charged under this section, in whole or in part, without regard to the amount of the debt, either under the criteria set forth in these standards for the compromise of debts, or if DOE determines that collection of these charges is against equity and good conscience or is not in the best interest of the United States.

(h) When a debtor requests a waiver or review of the debt, DOE will continue to accrue interest, penalties, and administrative costs during the period collection activity is suspended. Upon completion of DOE's review, interest, penalties, and administrative costs related to the portion of the debt found to be without merit will be waived.

(i) DOE is authorized to impose interest and related charges on debts not subject to 31 U.S.C. 3717, in accordance with the common law.

§ 1015.213 Analysis of costs.

DOE will prepare periodic comparisons of costs incurred and amounts collected. Data on costs and corresponding recovery rates for debts of different types and in various dollar ranges will be used to compare the cost effectiveness of alternative collection techniques, establish guidelines with respect to points at which costs of further collection efforts are likely to exceed recoveries, assist in evaluating offers in compromise, and establish minimum debt amounts below which collection efforts need not be taken.

§ 1015.214 Use and disclosure of mailing addresses.

(a) When attempting to locate a debtor in order to collect or compromise a debt under §§ 1015.100-105 of this part or other authority, DOE may send a request to Treasury to obtain a debtor's mailing address from the records of the IRS.

(b) DOE may use mailing addresses obtained under paragraph (a) of this section to enforce collection of a delinquent debt and may disclose such mailing addresses to other agencies and to collection agencies for collection purposes.

§ 1015.215 Federal salary offset.

(a) DOE may authorize Treasury to offset a Federal salary to satisfy delinquent debt in accordance with 5 U.S.C. 5514, Installment Deduction for Indebtedness to the United States; 5 CFR 550.1101 through 550.1108, Collection by Offset from Indebted Government Employees; 31 CFR parts 900-904, the revised Federal Claims Collection Standards; and 31 CFR 285.7, Salary Offset. DOE shall ensure that all of the rights and protections afforded to the debtor under 5 U.S.C. 5514 and 31 CFR 901.3 have been fulfilled. Claims due from Federal employees will be collected in accordance with DOE Order 2200.2B, Collection from Current and Former Employees for Indebtedness to the United States.

(b) As described in § 1015.201(e), under the DCIA (31 U.S.C. 3711(g)), DOE is required to refer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). As part of its regular debt collection procedures, Treasury may use Federal salary offset on behalf of DOE.

§ 1015.216 Exemptions.

(a) The preceding sections of this part, to the extent they reflect remedies or procedures prescribed by the Debt Collection Act of 1982 and the DCIA, such as administrative offset, use of credit bureaus, contracting for collection agencies, and interest and related charges, do not apply to debts arising under, or payments made under, the Internal Revenue Code of 1986, as amended (26 U.S.C. 1, et seq.); the Social Security Act (42 U.S.C. 301, et seq.) except to the extent provided under 42 U.S.C. 404 and 31 U.S.C. 3716(c); or the tariff laws of the United States. These remedies and procedures, however, may be authorized with respect to debts that are exempt from the Debt Collection Act of 1982 and the DCIA, to the extent that they are authorized under some other statute or the common law.

(b) This section should not be construed as prohibiting the use of these authorities or requirements when collecting debts owed by persons employed by agencies administering the laws cited in paragraph (a) of this section unless the debt arose under those laws.

Subpart C Standards for the Compromise of Claims

§ 1015.300 Scope.

This subpart sets forth the standards for the compromise of claims under this part. This subpart corresponds to 31 CFR part 902 of the Treasury Federal Claims Collection Standards.

§ 1015.301 Scope and application.

(a) The standards set forth in this subpart apply to the compromise of debts pursuant to 31 U.S.C. 3711. DOE's Chief Financial Officer or designee or Heads of Field Elements or designees in field locations may exercise such compromise authority for debts arising out of activities of, or referred or transferred for collection services to, DOE when the amount of the debt then due, exclusive of interest, penalties, and administrative costs, does not exceed $100,000 or any higher amount authorized by the Attorney General.

(b) Unless otherwise provided by law, when the principal balance of a debt, exclusive of interest, penalties, and administrative costs, exceeds $100,000 or any higher amount authorized by the Attorney General, the authority to accept the compromise rests with the DOJ. DOE will evaluate the compromise offer, using the factors set forth in this part. If an offer to compromise any debt in excess of $100,000 is acceptable to DOE, DOE shall refer the debt to the Civil Division or other appropriate litigating division in the DOJ using a Claims Collection Litigation Report (CCLR). DOE may obtain the CCLR from the DOJ's National Central Intake Facility. The referral shall include appropriate financial information and a recommendation for the acceptance of the compromise offer. DOJ approval is not required if DOE rejects a compromise offer.

§ 1015.302 Bases for compromise.

(a) DOE may compromise a debt if the Government cannot collect the full amount because:

(1) The debtor is unable to pay the full amount in a reasonable time, as verified through credit reports or other financial information;

(2) The Government is unable to collect the debt in full within a reasonable time by enforced collection proceedings;

(3) The cost of collecting the debt does not justify the enforced collection of the full amount; or

(4) There is significant doubt concerning the Government's ability to prove its case in court.

(b) In determining the debtor's inability to pay, DOE should consider relevant factors such as the following:

(1) Age and health of the debtor;

(2) Present and potential income;

(3) Inheritance prospects;

(4) The possibility that assets have been concealed or improperly transferred by the debtor; and

(5) The availability of assets or income that may be realized by enforced collection proceedings.

(c) DOE will verify the debtor's claim of inability to pay by using a credit report and other financial information as provided in paragraph (g) of this section. DOE will consider the applicable exemptions available to the debtor under state and Federal law in determining the Government's ability to enforce collection. DOE may also consider uncertainty as to the price that collateral or other property will bring at a forced sale in determining the Government's ability to enforce collection. A compromise effected under this section should be for an amount that bears a reasonable relation to the amount that can be recovered by enforced collection procedures, with regard to the exemptions available to the debtor and the time that collection will take.

(d) If there is significant doubt concerning the Government's ability to prove its case in court for the full amount claimed, either because of the legal issues involved or because of a bona fide dispute as to the facts, then the amount accepted in compromise of such cases should fairly reflect the probabilities of successful prosecution to judgment, with due regard given to the availability of witnesses and other evidentiary support for the Government's claim. In determining the litigative risks involved, DOE will consider the probable amount of court costs and attorney fees pursuant to the Equal Access to Justice Act, 28 U.S.C. 2412, that may be imposed against the Government if it is unsuccessful in litigation.

(e) DOE may compromise a debt if the cost of collecting the debt does not justify the enforced collection of the full amount. The amount accepted in compromise in such cases may reflect an appropriate discount for the administrative and litigative costs of collection, with consideration given to the time it will take to effect collection. Collection costs may be a substantial factor in the settlement of small debts. In determining whether the cost of collecting justifies enforced collection of the full amount, DOE should consider whether continued collection of the debt, regardless of cost, is necessary to further an enforcement principle, such as the Government's willingness to pursue aggressively defaulting and uncooperative debtors.

(f) DOE generally will not accept compromises payable in installments. This is not an advantageous form of compromise in terms of time and administrative expense. If, however, payment of a compromise in installments is necessary, DOE will obtain a legally enforceable, written agreement providing that, in the event of default, the full original principal balance of the debt prior to compromise, less sums paid thereon, is reinstated. Whenever possible, DOE also will obtain security for repayment in the manner set forth in subpart B of this part.

(g) To assess the merits of a compromise offer based in whole or in part on the debtor's inability to pay the full amount of a debt within a reasonable time, DOE will, if feasible, obtain a current financial statement from the debtor, executed under penalty of perjury, showing the debtor's assets, liabilities, income, and expenses. DOE also may obtain credit reports or other financial information to assess compromise offers. DOE may use its own financial information form or may request suitable forms from the DOJ or the local United States Attorney's Office.

§ 1015.303 Enforcement policy.

Pursuant to this part, DOE may compromise statutory penalties, forfeitures, or claims established as an aid to enforcement and to compel compliance, if DOE's enforcement policy in terms of deterrence and securing compliance, present and future, will be adequately served by DOE's acceptance of the sum to be agreed upon.

§ 1015.304 Joint and several liability.

(a) When two or more debtors are jointly and severally liable, DOE will pursue collection activity against all debtors, as appropriate. DOE will not attempt to allocate the burden of payment between the debtors, but will proceed to liquidate the indebtedness as quickly as possible.

(b) DOE will seek to ensure that a compromise agreement with one debtor does not release DOE's claim against the remaining debtors. The amount of a compromise with one debtor shall not be considered a precedent or binding in determining the amount that will be required from other debtors jointly and severally liable on the claim.

§ 1015.305 Further review of compromise offers.

If DOE is uncertain whether to accept a firm, written, substantive compromise offer on a debt that is within DOE's delegated compromise authority, it may refer the offer to the Civil Division or other appropriate litigating division in the DOJ, using a CCLR accompanied by supporting data and particulars concerning the debt. The DOJ may act upon such an offer or return it to DOE with instructions or advice.

§ 1015.306 Consideration of tax consequences to the Government.

In negotiating a compromise, DOE will consider the tax consequences to the Government. In particular, DOE will consider requiring a waiver of tax-loss-carry-forward and tax-loss-carry-back rights of the debtor. For information on discharge of indebtedness reporting requirements see § 1015.405 of this part.

§ 1015.307 Mutual releases of the debtor and the Government.

In all appropriate instances, a compromise that is accepted by DOE will be implemented by means of a mutual release, in which the debtor is released from further non-tax liability on the compromised debt in consideration of payment in full of the compromise amount and the Government and its officials, past and present, are released and discharged from any and all claims and causes of action arising from the same transaction that the debtor may have. In the event a mutual release is not executed when a debt is compromised, unless prohibited by law, the debtor is still deemed to have waived any and all claims and causes of action against the Government and its officials related to the transaction giving rise to the compromised debt.

Subpart D Standards for Suspending or Terminating Collection Activity

§ 1015.400 Scope.

The subpart sets forth the standards for terminating collection activity. This subpart corresponds to 31 CFR part 903 of the Treasury Federal Claims Collection Standards.

§ 1015.401 Scope and application.

(a) The standards set forth in this subpart apply to the suspension or termination of collection activity pursuant to 31 U.S.C. 3711 on debts that do not exceed $100,000, or such other amount as the Attorney General may direct, exclusive of interest, penalties, and administrative costs, after deducting the amount of partial payments or collections, if any. Prior to referring a debt to the DOJ for litigation, DOE may suspend or terminate collection under this part with respect to debts arising out of activities of, or referred to, DOE.

(b) If, after deducting the amount of any partial payments or collections, the principal amount of a debt exceeds $100,000, or such other amount as the Attorney General may direct, exclusive of interest, penalties, and administrative costs, the authority to suspend or terminate rests solely with the DOJ. If DOE believes that suspension or termination of any debt in excess of $100,000 may be appropriate, DOE shall refer the debt to the Civil Division or other appropriate litigating division in the DOJ, using the CCLR. The referral should specify the reasons for DOE's recommendation. If, prior to referral to the DOJ, DOE determines that a debt is plainly erroneous or clearly without legal merit, DOE may terminate collection activity regardless of the amount involved without obtaining DOJ concurrence.

§ 1015.402 Suspension of collection activity.

(a) DOE may suspend collection activity on a debt when:

(1) DOE cannot locate the debtor;

(2) The debtor's financial condition is expected to improve; or

(3) The debtor has requested a waiver or review of the debt.

(b) Based on the current financial condition of the debtor, DOE may suspend collection activity on a debt when the debtor's future prospects justify retention of the debt for periodic review and collection activity and:

(1) The applicable statute of limitations has not expired; or

(2) Future collection can be effected by administrative offset, notwithstanding the expiration of the applicable statute of limitations for litigation of claims, with due regard to the 10-year limitation for administrative offset prescribed by 31 U.S.C. 3716(e)(1); or

(3) The debtor agrees to pay interest on the amount of the debt on which collection will be suspended, and such suspension is likely to enhance the debtor's ability to pay the full amount of the principal of the debt with interest at a later date.

(c)(1) DOE shall suspend collection activity during the time required for consideration of the debtor's request for waiver or administrative review of the debt if the statute under which the request is sought prohibits DOE from collecting the debt during that time. As indicated in § 1015.212(h), DOE will continue to accrue interest, penalties, and administrative costs during the period collection activity is suspended.

(2) If the statute under which the request is sought does not prohibit collection activity pending consideration of the request, DOE may use discretion, on a case-by-case basis, to suspend collection. Further, DOE ordinarily will suspend collection action upon a request for waiver or review if DOE is prohibited by statute or regulation from issuing a refund of amounts collected prior to DOE's consideration of the debtor's request. However, DOE will not suspend collection when DOE determines that the request for waiver or review is frivolous or was made primarily to delay collection.

(d) When DOE learns that a bankruptcy petition has been filed with respect to a debtor, in most cases the collection activity on a debt must be suspended, pursuant to the provisions of 11 U.S.C. 362, 1201, and 1301, unless DOE can clearly establish that the automatic stay has been lifted or is no longer in effect. DOE will seek legal advice immediately from counsel and, if legally permitted, take the necessary legal steps to ensure that no funds or money is paid by DOE to the debtor until relief from the automatic stay is obtained.

§ 1015.403 Termination of collection activity.

(a) DOE may terminate collection activity when:

(1) DOE is unable to collect any substantial amount through its own efforts or through the efforts of others;

(2) DOE is unable to locate the debtor;

(3) Costs of collection are anticipated to exceed the amount recoverable;

(4) The debt is legally without merit, or enforcement of the debt is barred by any applicable statute of limitations;

(5) The debt cannot be substantiated; or

(6) The debt against the debtor has been discharged in bankruptcy.

(b) Before terminating collection activity, DOE will have pursued all appropriate means of collection and determined, based upon the results of the collection activity, that the debt is uncollectible. Termination of collection activity ceases active collection of the debt. The termination of collection activity does not preclude DOE from retaining a record of the account for purposes of:

(1) Selling the debt, if Treasury determines that such sale is in the best interests of the United States;

(2) Pursuing collection at a subsequent date in the event there is a change in the debtor's status or a new collection tool becomes available;

(3) Offsetting against future income or assets not available at the time of termination of collection activity; or

(4) Screening future applicants for prior indebtedness.

(c) Generally, DOE shall terminate collection activity on a debt that has been discharged in bankruptcy, regardless of the amount. DOE may continue collection activity, however, subject to the provisions of the Bankruptcy Code, for any payments provided under a plan of reorganization. Offset and recoupment rights may survive the discharge of the debtor in bankruptcy and, under some circumstances, claims also may survive the discharge. For example, if DOE is a known creditor of a debtor, its claims may survive a discharge if DOE did not receive formal notice of the proceedings. DOE will seek legal advice from counsel if it believes it has claims or offsets that may survive the discharge of a debtor.

§ 1015.404 Exception to termination.

When a significant enforcement policy is involved, or recovery of a judgment is a prerequisite to the imposition of administrative sanctions, DOE may refer debts for litigation even though termination of collection activity may otherwise be appropriate.

§ 1015.405 Discharge of indebtedness; reporting requirements.

(a) Before discharging a delinquent debt (also referred to as a close out of the debt), DOE shall take all appropriate steps to collect the debt in accordance with 31 U.S.C. 3711(g), including, as applicable, administrative offset, tax refund offset, Federal salary offset, referral to Treasury, Treasury-designated debt collection centers or private collection contractors, credit bureau reporting, wage garnishment, litigation, and foreclosure. Discharge of indebtedness is distinct from termination or suspension of collection activity under § 1015.400 of this part and is governed by the Internal Revenue Code. When collection action on a debt is suspended or terminated, the debt remains delinquent and further collection action may be pursued at a later date in accordance with the standards set forth in this subpart. When DOE discharges a debt in full or in part, further collection action is prohibited. Therefore, DOE will make the determination that collection action is no longer warranted before discharging a debt. Before discharging a debt, DOE must terminate debt collection action.

(b) 31 U.S.C. 3711(i) requires DOE to sell a delinquent non-tax debt upon termination of collection action if Treasury determines such a sale is in the best interests of the United States. Since the discharge of a debt precludes any further collection action (including the sale of a delinquent debt), DOE may not discharge a debt until the requirements of 31 U.S.C. 3711(i) have been met.

(c) Upon discharge of an indebtedness, DOE must report the discharge to the IRS in accordance with the requirements of 26 U.S.C. 6050P and 26 CFR 1.6050P-1. DOE may request Treasury or Treasury-designated debt collection centers to file such a discharge report to the IRS on DOE's behalf.

(d) When discharging a debt, DOE must request that litigation counsel release any liens of record securing the debt.

Subpart E Referrals to the Department of Justice

§ 1015.500 Scope.

This subpart sets forth the standards for referrals to the Department of Justice. This subpart corresponds to 31 CFR part 904 of the Treasury Federal Claims Collection Standards.

§ 1015.501 Referrals to the Department of Justice and the Department of the Treasury's Cross-Servicing Program.

(a) DOE may authorize Treasury to refer a delinquent debt to the DOJ for litigation in accordance with 31 U.S.C. 3711(g), the DCIA, the revised Federal Claims Collection Standards (31 CFR parts 900-904), and other applicable authorities. DOE shall ensure that all of the rights and protections afforded to the debtor under 31 U.S.C. 3711(e) have been fulfilled.

(b) As described in § 1015.201(e), under the DCIA (31 U.S.C. 3711(g)), DOE is required to transfer all debts over 180 days delinquent to Treasury for purposes of debt collection (i.e., cross-servicing). As part of its regular debt collection procedures, Treasury will refer debts to the DOJ for litigation on behalf of DOE.

§ 1015.502 Prompt referral.

(a) If a debt is not referred to the DOJ through Treasury's cross-servicing program, DOE shall promptly refer to the DOJ for litigation debts on which aggressive collection activity has been taken in accordance with § 1015.200 of this part and that cannot be compromised, or on which collection activity cannot be suspended or terminated, in accordance with §§ 1015.300 and 1015.400 of this part. DOE may refer those debts arising out of activities of DOE. Debts for which the principal amount is over $1,000,000, or such other amount as the Attorney General may direct, exclusive of interest and penalties, shall be referred to the Civil Division or other division responsible for litigating such debts at the DOJ, Washington, DC. Debts for which the principal amount is $1,000,000, or less, or such other amount as the Attorney General may direct, exclusive of interest or penalties, shall be referred to the DOJ's Nationwide Central Intake Facility as required by the CCLR instructions. Claims will be referred as early as possible, consistent with aggressive agency collection activity and the observance of the standards contained in the Federal Claims Collection Standards (31 CFR parts 900-904), and, in any event, well within the period for initiating timely lawsuits against the debtors. DOE shall make every effort to refer delinquent debts to the DOJ for litigation within one year of the date such debts last became delinquent. In the case of guaranteed or insured loans, DOE will make every effort to refer these delinquent debts to the DOJ for litigation within one year from the date the loan was presented to DOE for payment or re-insurance.

(b) The DOJ has exclusive jurisdiction over the debts referred to it pursuant to this section. DOE shall refrain from having any contact with the debtor and shall direct all debtor inquiries concerning the claim to the DOJ. DOE shall notify the DOJ immediately of any payments credited by DOE to the debtor's account after referral of a debt or claim under this section. The DOJ shall notify DOE, in a timely manner, of any payments it receives from the debtor.

§ 1015.503 Claims Collection Litigation Report.

(a) Unless excepted by the DOJ, DOE shall complete the CCLR (see § 1015.301 of this part), accompanied by a signed Certificate of Indebtedness, to refer all administratively uncollectible claims to the DOJ for litigation. DOE shall complete all of the sections of the CCLR appropriate to each claim as required by the CCLR instructions and furnish such other information as may be required in specific cases.

(b) DOE shall indicate clearly on the CCLR the actions it wishes the DOJ to take with respect to the referred claim. The CCLR permits DOE to indicate specifically any of a number of litigative activities which the DOJ may pursue, including enforced collection, judgment lien only, renew judgment lien only, renew judgment lien and enforce collection, program enforcement, foreclosure only, and foreclosure and deficiency judgment.

(c) DOE also shall use the CCLR to refer claims to the DOJ to obtain the DOJ's approval of any proposals to compromise the claims or to suspend or terminate DOE collection activity.

§ 1015.504 Preservation of evidence.

DOE will take care to preserve all files and records that may be needed by the DOJ to prove its claims in court. DOE ordinarily will include certified copies of the documents that form the basis for the claim in the packages referring its claims to the DOJ for litigation. DOE shall provide originals of such documents immediately upon request by the DOJ.

§ 1015.505 Minimum amount of referrals to the Department of Justice.

(a) DOE shall not refer for litigation claims of less than $2,500, exclusive of interest, penalties, and administrative costs, or such other amount as the Attorney General shall from time to time prescribe. The DOJ promptly shall notify DOE if the Attorney General changes this minimum amount.

(b) DOE shall not refer claims of less than the minimum amount unless:

(1) Litigation to collect such smaller claims is important to ensure compliance with DOE's policies or programs;

(2) The claim is being referred solely for the purpose of securing a judgment against the debtor, which will be filed as a lien against the debtor's property pursuant to 28 U.S.C. 3201 and returned to DOE for enforcement; or

(3) The debtor has the clear ability to pay the claim and the Government effectively can enforce payment, with due regard for the exemptions available to the debtor under state and Federal law and the judicial remedies available to the Government.

(4) DOE will consult with the Financial Litigation Staff of the Executive Office for United States Attorneys in the DOJ prior to referring claims valued at less than the minimum amount.

PART 1016 SAFEGUARDING OF RESTRICTED DATA BY ACCESS PERMITTEES

Authority: Sec. 161i of the Atomic Energy Act of 1954, 68 Stat. 948 (42 U.S.C. 2201).

Source: 48 FR 36432, Aug. 10, 1983, unless otherwise noted.

22 General Provisions

§ 1016.1 Purpose.

The regulations in this part establish requirements for the safeguarding of Secret and Confidential Restricted Data received or developed under an access permit. This part does not apply to Top Secret information since no such information may be forwarded to an access permittee within the scope of this regulation.

§ 1016.2 Scope.

The regulations in this part apply to all persons who may require access to Retricted Data used, processed, stored, reproduced, transmitted, or handled in connection with an access permit.

§ 1016.3 Definitions.

(a) Access authorization. An administrative determination by DOE that an individual who is either a DOE employee, applicant for employment, consultant, assignee, other Federal department or agency employee (or other persons who may be designated by the Secretary of Energy), or a DOE contractor or subcontractor employee, or an access permittee is eligible for access to Restricted Data. Access authorizations granted by DOE are designated as “Q,” “Q(X),” “L,” or “L(X).”

(1) “Q” access authorizations are based upon single scope background investigations as set forth in applicable DOE and national-level directives. They permit an individual who has “need to know” access to Top Secret, Secret and Confidential Restricted Data, Formerly Restricted Data, National Security Information, or special nuclear material in Category I or II quantities as required in the performance of duties, subject to additional determination that permitting this access will not endanger the common defense or national security of the United States. There may be additional requirements for access to specific types of RD information.

(2) “Q(X)” access authorizations are based upon the same level of investigation required for a Q access authorization. When “Q” access authorizations are granted to access permittees they are identified as “Q(X)” access authorizations and, as need-to-know applies, authorize access only to the type of Secret Restricted Data as specified in the permit and consistent with appendix A, 10 CFR part 725, “Categories of Restricted Data Available.”

(3) “L” access authorizations are based upon a Tier III (formerly National Agency Check with Local Agency Checks and Credit Checks (NACLC)/Access National Agency Check with Inquiries (ANACI)) background investigation as set forth in applicable national-level directives. They permit an individual who has “need to know” access to Confidential Restricted Data, Secret and Confidential Formerly Restricted Data, or Secret and Confidential National Security Information, required in the performance of duties, provided such information is not designated “CRYPTO” (classified cryptographic information), “COMSEC” (communications security), or intelligence information and subject to additional determination that permitting this access will not endanger the common defense or national security of the United States. There may be additional requirements for access to specific types of RD information.

(4) “L(X)” access authorizations are based upon the same level of investigation required for an “L” access authorization. When “L” access authorizations are granted to access permittees, they are identified as “L(X)” access authorizations and, as need to know applies, authorize access only to the type of Confidential Restricted Data as specified in the permit and consistent with appendix A, 10 CFR part 725, “Categories of Restricted Data Available.”

(b) Act. The Atomic Energy Act of 1954 (68 Stat. 919) as amended.

(c) Classified mail address. A mail address established for each access permittee and approved by the DOE to be used when sending Restricted Data to the permittee.

(d) Classified matter. Anything in physical form (including, but not limited to documents and material) that contains or reveals classified information.

(e) Combination lock. A built-in combination lock on a security container which is of tempered steel alloy hard plate, at least 1/4″ in thickness and Rockwell hardness of C-63 to C-65, of sufficient size and so located as to sufficiently impede access to the locking mechanism by drilling of the lock or container.

(f) DOE. The United States Department of Energy or its duly authorized representatives.

(g) Formerly Restricted Data. Classified information jointly determined by the DOE and the Department of Defense to be related primarily to the military utilization of atomic weapons and removed by the DOE from the Restricted Data category pursuant to section 142(d) of the Atomic Energy Act of 1954, as amended.

(h) Infraction. An act or omission involving failure to comply with DOE safeguards and security orders, directives, or approvals and may include a violation of law.

(i) Intrusion detection system. A security system consisting of sensors capable of detecting one or more types of phenomena, signal media, annunciators, energy sources, alarm assessment systems, and alarm reporting elements including alarm communications and information display equipment.

(j) National Security. The national defense and foreign relations of the United States.

(k) National Security Information. Information that has been determined pursuant to Executive Order 13526, as amended “Classified National Security Information” or any predecessor order to require protection against unauthorized disclosure and is marked to indicate its classified status when in documentary form.

(l) “Need to know.” A determination by persons having responsibility for classified information or matter, that a proposed recipient's access to such classified information or matter is necessary in the performance of official, contractual, or access permit duties of employment under cognizance of the DOE.

(m) Permittee. The holder of an Access Permit issued pursuant to the regulations set forth in 10 CFR part 725, “Permits For Access to Restricted Data.”

(n) Person. Any individual, corporation, partnership, firm, association, trust, estate, public or private institution, group, Government agency other than DOE, any State or any political subdivision of, or any political entity within a State, or other entity; and any legal successor, representative, agency, or agency of the foregoing.

(o) Protective personnel. Guards or watchmen or other persons designated responsibility for the protection of classified matter.

(p) Restricted Data. All data concerning design, manufacture, or utilization of atomic weapons; the production of special nuclear material; or the use of special nuclear material in the production of energy, but shall not include data declassified or removed from the Restricted Data category pursuant to section 142 of the Act.

(q) Security area. A physically defined space containing classified matter and subject to physical protection and personnel access controls.

(r) Security clearance. See access authorization.

(s) Security facility. Any facility, including an access permittee, which has been approved by the DOE for using, processing, storing, reproducing, transmitting, or handling classified matter.

(t) Security facility approval. A determination by the DOE that a facility, including an access permittee, is eligible to use, process, store, reproduce, transmit, or handle classified matter.

(u) Security Plan. A written plan by the access permittee, and submitted to the DOE for approval, which outlines the permittee's proposed security procedures and controls for the protection of Restricted Data and which includes a floor plan of the area in which the classified matter is to be used, processed, stored, reproduced, transmitted, or handled.

(v) Security survey. An onsite examination by a DOE representative of all devices, equipment, and procedures employed at a security facility to safeguard classified matter.

[48 FR 36432, Aug. 10, 1983, as amended at 71 FR 68735, Nov. 28, 2006; 82 FR 41505, Sept. 1, 2017]

§ 1016.4 Communications.

Communications concerning rulemaking, i.e., petition to change this part, should be addressed to the Director, Office of Environment, Health, Safety and Security, EHSS-1/Forrestal Building, Office of Environment, Health, Safety and Security, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585. All other communications concerning the regulations in this part should be addressed to the cognizant DOE or National Nuclear Security Administration (NNSA) office.

[82 FR 41505, Sept. 1, 2017, as amended at 88 FR 41294, June 26, 2023]

§ 1016.5 Submission of procedures by access permit holder.

No access permit holder shall have access to Restricted Data until he has submitted to the DOE a written statement of his procedures for the safeguarding of Restricted Data and for the security education of his employees, and DOE shall have determined and informed the permittee that his procedures for the safeguarding of Restricted Data are in compliance with the regulations in this part and that his procedures for the security education of his employees, who will have access to Restricted Data, are informed about and understand the regulations in this part. These procedures must ensure that employees with access to Restricted Data are informed about and understand who is authorized or required to classify and declassify RD and FRD information and classified matter as well as how documents containing RD or FRD are marked (see 10 CFR part 1045) and safeguarded.

[82 FR 41506, Sept. 1, 2017]

§ 1016.6 Specific waivers.

DOE may, upon application of any interested party, grant such waivers from the requirements of this part as it determines are authorized by law and will not constitute an undue risk to the common defense and security.

§ 1016.7 Interpretations.

Except as specifically authorized by the Secretary of Energy in writing, no interpretation of the meaning of the regulations in this part by any officer or employee of DOE other than a written interpretation by the General Counsel will be recognized to be binding upon DOE.

23 Physical Security

§ 1016.8 Request for security facility approval.

(a) An access permittee who has a need to use, process, store, reproduce, transmit, or handle Restricted Data at any location in connection with its permit shall promptly request a DOE security facility approval.

(b) The request shall include the following information: The name and address of the permittee; the extent and scope of the classified activity and the highest classification of Restricted Data to be received; a written statement in the form of a security plan which outlines the permittee's proposed security procedures and controls for the protection of Restricted Data, including a floor plan of the areas(s) in which the classified matter is to be used, processed, stored, reproduced, transmitted, and handled.

(c) The DOE will promptly inform the permittee of the acceptability of the request for further processing and will notify the permittee of its decision in writing.

§ 1016.9 Processing security facility approval.

Following receipt of an acceptable request for security facility approval, the DOE will perform an initial security survey of the permittee's facility to determine that granting a security facility approval would be consistent with the national security. If DOE makes such a determination, security facility approval will be granted. If not, security facility approval will be withheld pending compliance with the security survey recommendations or until a waiver is granted pursuant to § 1016.6.

[82 FR 41506, Sept. 1, 2017]

§ 1016.10 Granting, denial, or suspension of security facility approval.

Notification of the DOE's granting, denial, or suspension of security facility approval will be furnished the permittee in writing, or orally with written confirmation. This information may also be furnished to representatives of the DOE, DOE contractors, or other Federal agencies having a need to transmit Restricted Data to the permittee.

[82 FR 41506, Sept. 1, 2017]

§ 1016.11 Cancellation of requests for security facility approval.

When a request for security facility approval is to be withdrawn or cancelled, the cognizant DOE Office will be notified by the requester immediately by telephone and confirmed in writing so that processing of this approval may be terminated.

[82 FR 41506, Sept. 1, 2017]

§ 1016.12 Termination of security facility approval.

(a) Security facility approval will be terminated when:

(1) There is no longer a need to use, process, store, reproduce, transmit, or handle Restricted Data at the facility; or

(2) The DOE makes a determination that continued security facility approval is not in the interest of common defense and security.

(b) The permittee will be notified in writing of a determination to terminate facility approval, and the procedures outlined in § 1016.27 will apply.

[82 FR 41506, Sept. 1, 2017]

§ 1016.13 Protection of Restricted Data in storage.

(a) Persons who possess Restricted Data pursuant to an Access Permit shall store the Restricted Data classified matter when not in use in a locked storage container or DOE-approved vault to which only persons with appropriate access authorization and a need to know the information contained have access. Storage containers used for storing classified matter must conform to U.S. General Services Administration (GSA) standards and specifications.

(b) Each permittee shall change the combination on locks of his safekeeping equipment whenever such equipment is placed in use, whenever an individual knowing the combination no longer requires access to the repository as a result of change in duties or position in the permittee's organization, or termination of employment with the permittee or whenever the combination has been subjected to compromise, and in any event at least once a year. Permittees shall classify records of combinations no lower than the highest classification of the classified matter authorized for storage in the safekeeping equipment concerned.

[82 FR 41506, Sept. 1, 2017]

§ 1016.14 Protection of Restricted Data while in use.

While in use, classified matter containing Restricted Data shall be under the direct control of a person with the appropriate access authorization and need to know. Unauthorized access to the Restricted Data shall be precluded.

[82 FR 41506, Sept. 1, 2017]

§ 1016.15 Establishment of security areas.

(a) When, because of their nature or size, it is impracticable to safeguard classified matter containing Restricted Data in accordance with the provisions of §§ 1016.13 and 1016.14, a security area to protect such classified matter shall be established.

(b) The following controls shall apply to security areas:

(1) Security areas shall be separated from adjacent areas by a physical barrier designed to prevent entrance into such areas, and access to the Restricted Data within the areas, by unauthorized individuals.

(2) During working hours, admittance shall be controlled by an appropriately cleared individual posted at each unlocked entrance.

(3) During nonworking hours, admittance shall be controlled by protective personnel on patrol, with protective personnel posted at unlocked entrances, or by such intrusion detection system as DOE approves.

(4) Each individual authorized to enter a security area shall be issued a distinctive badge or pass when the number of employees assigned to the area exceeds thirty.

[82 FR 41506, Sept. 1, 2017]

§ 1016.16 Special handling of classified material.

When the Restricted Data contained in material is not ascertainable by observation or examination at the place where the material is located and when the material is not readily removable because of size, weight, radioactivity, or similar factors, DOE may authorize the permittee to provide such lesser protection than is otherwise required by §§ 1016.21 to 1016.23 inclusive, as DOE determines to be commensurate with the difficulty of removing the material.

[48 FR 36432, Aug. 10, 1983. Redesignated at 82 FR 41506, Sept. 1, 2017

§ 1016.17 Protective personnel.

Whenever armed protective personnel are required in accordance with § 1016.15, such protective personnel shall:

(a) Possess a “Q” or “L” access authorization or “Q(X)” or “L(X)” access authorization if the Restricted Data being protected is classified Confidential, or a “Q” access authorization or “Q(X)” access authorization if the Restricted Data being protected is classified Secret.

(b) Be armed with sidearms of 9mm or greater.

[82 FR 41507, Sept. 1, 2017]

24 Control of Information

§ 1016.18 Access to Restricted Data.

(a) Except as DOE may authorize, no person subject to the regulations in this part shall permit any individual to have access to Restricted Data in his possession unless the individual has an appropriate access authorization granted by DOE, or has been certified by DOD or NASA through DOE; and

(1) The individual is authorized by an Access Permit to receive Restricted Data in the categories involved and the permittee determines that such access is required in the course of his duties; or

(2) The individual needs such access in connection with such duties as a DOE employee or DOE contractor employee, or as certified by DOD or NASA.

(b) Inquiries concerning the access authorization status of individuals, the scope of Access Permits, or the nature of contracts should be addressed to the cognizant DOE or NNSA office.

[82 FR 41507, Sept. 1,2017]

§ 1016.19 Review, classification and marking of classified information.

(a) Classification. Restricted Data generated or possessed by an Access Permit holder must be appropriately classified and marked in accordance with 10 CFR part 1045. CG-DAR-2, “Guide to the Declassified Areas of Nuclear Energy Research U 08/98,” will be furnished each permittee. In the event a permittee originates classified information which falls within the definition of Restricted Data or information for which the permittee is not positive that the information is outside of that definition and CG-DAR-2 does not provide positive classification guidance for such information, the permittee shall designate the information as Confidential, Restricted Data and request classification guidance from the DOE through the Classification Officer at the cognizant DOE or NNSA office. If the DOE Classification Officer does not have authority to provide the guidance, he will refer the request to the Director, Office of Classification, EHSS-60/Germantown Building, Office of Environment, Health, Safety and Security, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-1290.

(b) Challenges. If a person receives a document or other classified matter which, in his opinion, is not properly classified, or omits the appropriate classification markings, he is encouraged to challenge the classification and there shall be no retribution for submitting a challenge. Challenges shall be submitted in accordance with 10 CFR part 1045.

(c) Classification markings. Restricted Data generated or possessed by an individual approved for access must be appropriately identified and marked in accordance with 10 CFR part 1045, Nuclear Classification and Declassification. Questions and requests for additional direction or guidance regarding the marking of classified matter may be submitted to the Director, Office of Classification, EHSS-60/Germantown Building, Office of Environment, Health, Safety and Security, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-1290.

[82 FR 41507, Sept. 1, 2017, as amended at 88 FR 41294, June 26, 2023]

§ 1016.20 External transmission of Restricted Data.

(a) Restrictions. (1) Restricted Data shall be transmitted only to persons who possess appropriate access authorization, need to know, and are otherwise eligible for access under the requirements of § 1016.18.

(2) In addition, such classified matter containing Restricted Data shall be transmitted only to persons who possess approved facilities for their physical security consistent with this part. Any person subject to the regulations in this part who transmits such Restricted Data containing Restricted Data shall be deemed to have fulfilled his obligations under this paragraph (a)(2) by securing a written certification from the prospective recipient that such recipient possesses facilities for its physical security consistent with this part.

(3) Restricted Data shall not be exported from the United States without prior authorization from DOE.

(b) Preparation of documents. Documents containing Restricted Data shall be prepared for transmission outside an individual installation in accordance with the following:

(1) They shall be enclosed in two sealed, opaque envelopes or wrappers.

(2) The inner envelope or wrapper shall be addressed in the ordinary manner and sealed with tape, the appropriate classification shall be marked on both sides of the envelope, and any additional marking required by 10 CFR part 1045 shall be applied.

(3) The outer envelope or wrapper shall be addressed in the ordinary manner. No classification, additional marking, or other notation shall be affixed which indicates that the document enclosed therein contains classified information or Restricted Data.

(4) A receipt which identifies the document, the date of transfer, the recipient, and the person transferring the document shall accompany the document and shall be signed by the recipient and returned to the sender whenever the custody of a document containing Secret Restricted Data is transferred.

(c) Preparation of other classified matter. Classified matter, other than documents, containing Restricted Data shall be prepared for shipment outside an individual installation in accordance with the following:

(1) The classified matter shall be so packaged that the classified characteristics will not be revealed.

(2) A receipt which identifies the classified matter, the date of shipment, the recipient, and the person transferring the classified matter shall accompany the classified matter, and the recipient shall sign such receipt whenever the custody of classified matter containing Secret Restricted Data is transferred.

(d) Methods of transportation. (1) Secret classified matter shall be transported only by one of the following methods:

(i) By messenger-courier system specifically created for that purpose and approved for use by DOE.

(ii) Registered mail.

(iii) By protective services provided by United States air or surface commercial carriers under such conditions as may be preserved by the DOE.

(iv) Individuals possessing appropriate DOE access authorization who have been given written authority by their employers.

(2) Confidential classified matter may be transported by one of the methods set forth in paragraph (d)(1) of this section or by U.S. first class, express, or certified mail.

(e) Telecommunication of classified information. There shall be no telecommunication of Restricted Data unless the secure telecommunication system has been approved by the DOE.

[82 FR 41507, Sept. 1, 2017]

§ 1016.21 Accountability for Secret Restricted Data.

Each permittee possessing classified matter (including classified matter in electronic format) containing Secret Restricted Data shall establish accountability procedures and shall maintain logs to document access to and record comprehensive disposition information for all such classified matter that has been in his custody at any time.

[82 FR 41507, Sept. 1, 2017]

§ 1016.22 Authority to reproduce Restricted Data.

Secret Restricted Data will not be reproduced without the written permission of the originator, his successor, or high authority. Confidential Restricted Data may be reproduced to the minimum extent necessary consistent with efficient operation without the necessity for permission.

[48 FR 36432, Aug. 10, 1983. Redesiganted at 82 FR 41508, Sept. 1, 2017]

§ 1016.23 Changes in classification.

Classified matter containing Restricted Data shall not be downgraded or declassified except as authorized by DOE and in accordance with 10 CFR part 1045.

[82 FR 41508, Sept. 1, 2017]

§ 1016.24 Destruction of classified matter containing Restricted Data.

Documents containing Restricted Data may be destroyed by burning, pulping, or another method that assures complete destruction of the information which they contain. Restricted Data contained in classified matter, other than documents, may be destroyed only by a method that assures complete obliteration, removal, or destruction of the Restricted Data.

[82 FR 41508, Sept. 1, 2017]

§ 1016.25 Storage, use, processing, transmission and destruction of classified information on computers, computer networks, electronic devices/media and mobile devices.

Storage, use, processing, and transmission of Restricted Data on computers, computer networks, electronic devices/media and mobile devices must be approved by DOE. DOE-approved methods must be used when destroying classified information that is in electronic format.

[82 FR 41508, Sept. 1, 2017]

§ 1016.26 Suspension or revocation of access authorization.

In any case where the access authorization of an individual subject to the regulations in this part is suspended or revoked in accordance with the procedures set forth in 10 CFR part 710, such individual shall, upon due notice from DOE of such suspension or revocation and demand by DOE, deliver to DOE any and all Restricted Data in his possession for safekeeping and such further disposition as DOE determines to be just and proper.

[48 FR 36432, Aug. 10, 1983. Redesignated at 82 FR 41508, Sept. 1, 2017]

§ 1016.27 Termination, suspension, or revocation of security facility approval.

(a) In accordance with § 1016.12, if the need to use, process, store, reproduce, transmit, or handle classified matter no longer exists, the security facility approval will be terminated. The permittee may deliver all Restricted Data to the DOE or to a person authorized to receive them; or the permittee may destroy all such Restricted Data. In either case, the facility must submit a certification of non-possession of Restricted Data to the DOE.

(b) In any instance where security facility approval has been suspended or revoked based on a determination of the DOE that further possession of classified matter by the permittee would endanger the common defense and national security, the permittee shall, upon notice from the DOE, immediately deliver all Restricted Data to the DOE along with a certificate of non-possession of Restricted Data.

[82 FR 41508, Sept. 1, 2017]

§ 1016.28 Termination of employment or change of duties.

Each permittee shall furnish promptly to DOE written notification of the termination of employment of each individual who possesses an access authorization under his Permit or whose duties are changed so that access to Restricted Data is no longer needed. Upon such notification, DOE may:

(a) Terminate the individual's access authorization, or

(b) Transfer the individual's access authorization to the new employer of the individual to allow continued access to Restricted Data where authorized, pursuant to DOE regulations.

[48 FR 36432, Aug. 10, 1983. Redesignated at 82 FR 41508, Sept. 1, 2017]

§ 1016.29 Continued applicability of the regulations in this part.

The expiration, suspension, revocation, or other termination of a security clearance or access authorization or security facility approval shall not relieve any person from compliance with the regulations in this part.

[48 FR 36432, Aug. 10, 1983. Redesignated at 82 FR 41508, Sept. 1, 2017]

§ 1016.30 Reports.

Each permittee shall immediately report to the DOE office administering the permit any alleged or suspected violation of the Atomic Energy Act of 1954, as amended, Espionage Act, or other Federal statutes related to Restricted Data. Additionally, the permittee shall report any infractions, losses, compromises, or possible compromise of Restricted Data.

[48 FR 36432, Aug. 10, 1983. Redesignated at 82 FR 41508, Sept. 1, 2017]

§ 1016.31 Inspections.

The DOE shall make such inspections and surveys of the premises, activities, records, and procedures of any person subject to the regulations in this part as DOE deems necessary to effectuate the purposes of the Act, Executive Order 13526, and DOE orders and procedures.

[82 FR 41508, Sept. 1, 2017]

§ 1016.32 Violations.

An injunction or other court order may be obtained prohibiting any violation of any provision of the Act or any regulation or order issued thereunder. Any person who willfully violates, attempts to violate, or conspires to violate any provision of the Act or any regulation or order issued thereunder, including the provisions of this part, may be guilty of a crime and upon conviction may be punished by fine or imprisonment, or both, as provided by law.

[48 FR 36432, Aug. 10, 1983. Redesignated at 82 FR 41508, Sept. 1, 2017]

PART 1017 IDENTIFICATION AND PROTECTION OF UNCLASSIFIED CONTROLLED NUCLEAR INFORMATION

Authority: 42 U.S.C. 7101 et seq.; 50 U.S.C. 2401 et seq.; 42 U.S.C. 2168; 28 U.S.C. 2461 note.

Source: 73 FR 32641, June 10, 2008, unless otherwise noted.

Subpart A General Overview

§ 1017.1 Purpose and scope.

(a) This part implements section 148 of the Atomic Energy Act (42 U.S.C. 2168) which prohibits the unauthorized dissemination of certain unclassified Government information. This information identified by the term “Unclassified Controlled Nuclear Information” (UCNI) consists of certain design and security information concerning nuclear facilities, nuclear materials, and nuclear weapons.

(b) This part:

(1) Provides for the review of information prior to its designation as UCNI;

(2) Describes how information is determined to be UCNI;

(3) Establishes minimum physical protection standards for documents and material containing UCNI;

(4) Specifies who may have access to UCNI; and,

(5) Establishes a procedure for the imposition of penalties on persons who violate section 148 of the Atomic Energy Act or any regulation or order of the Secretary issued under section 148 of the Atomic Energy Act, including this part.

(c) This part does not apply to information controlled under 10 U.S.C. 128 by the Department of Defense.

§ 1017.2 Applicability.

This part applies to any person who is or was authorized access to UCNI, requires authorized access to UCNI, or attempts to gain or gains unauthorized access to UCNI.

§ 1017.3 Policy.

The Department of Energy (DOE) strives to make information publicly available to the fullest extent possible. Therefore, this part must be interpreted and implemented to apply the minimum restrictions needed to protect the health and safety of the public or the common defense and security consistent with the requirement in section 148 of the Atomic Energy Act to prohibit the unauthorized dissemination of UCNI.

§ 1017.4 Definitions.

As used in this part:

Atomic Energy Act means the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.).

Atomic energy defense programs means Government activities, equipment, and facilities that are capable of:

(1) Developing, producing, testing, sampling, maintaining, repairing, modifying, assembling or disassembling, using, transporting, or retiring nuclear weapons or components of nuclear weapons; or

(2) Producing, using, or transporting nuclear material that could be used in nuclear weapons or military-related utilization facilities.

Authorized Individual means a person who has routine access to UCNI under § 1017.20.

Component means any operational, experimental, or research-related part, subsection, design, or material used in the manufacture or utilization of a nuclear weapon, nuclear explosive device, or nuclear weapon test assembly.

Denying Official means a DOE official designated under 10 CFR 1004.2(b) who is authorized to deny a request for unclassified information that is exempt from release when requested under the Freedom of Information Act (FOIA).

Director means the DOE Official, or his or her designee, to whom the Secretary has assigned responsibility for enforcement of this part.

Document means the physical medium on or in which information is recorded, regardless of its physical form or characteristics.

DOE means the United States Department of Energy, including the National Nuclear Security Administration (NNSA).

Essential technology-related information means technical information whose unauthorized dissemination could significantly increase the likelihood of the illegal production of a nuclear weapon.

Exploitable security-related information means information whose unauthorized dissemination could significantly increase the likelihood of the theft, diversion, or sabotage of nuclear material, equipment, or facilities.

Government means the Executive Branch of the United States Government.

Government information means any fact or concept, regardless of its physical form or characteristics, that is owned by, produced by or for, or otherwise controlled by the United States Government, including such facts or concepts that are provided by the Government to any person, including persons who are not employees of the Government.

Guidance means detailed written instructions that describe decisions made by the Secretary or his/her designee issued under Subpart B of these regulations concerning what specific information is UCNI.

Illegal production means the production or manufacture of a nuclear weapon in violation of either domestic (e.g., the Atomic Energy Act) or international (e.g., the Treaty on the Non-Proliferation of Nuclear Weapons) law.

In transit means the physical movement of a nuclear weapon, a component of a nuclear weapon containing nuclear material, or nuclear material from one part to another part of a facility or from one facility to another facility. An item is considered “in transit” until it has been relinquished to the custody of the authorized recipient and is in storage at its ultimate destination. An item in temporary storage pending shipment to its ultimate destination is “in transit.”

Limited access means access to specific UCNI granted by the cognizant DOE Program Secretarial Officer or a Deputy or Associate Administrator of the NNSA to an individual not eligible for routine access (see § 1017.21).

Material means a product (e.g., a part or a machine) or substance (e.g., a compound or an alloy), regardless of its physical form or characteristics.

Need to know means a determination made by an Authorized Individual that a person requires access to specific UCNI to perform official duties or other Government-authorized activities.

Nuclear material means special nuclear material, byproduct material, or source material as defined by sections 11.aa., 11.e., and 11.z., respectively, of the Atomic Energy Act (42 U.S.C. 2014 aa., e., and z), or any other material used in the production, testing, utilization, or assembly of nuclear weapons or components of nuclear weapons that the Secretary determines to be nuclear material under § 1017.9(a).

Nuclear weapon means atomic weapon as defined in section 11.d. of the Atomic Energy Act (42 U.S.C. 2014 d).

Person means any person as defined in section 11.s. of the Atomic Energy Act (42 U.S.C. 2014 s) or any affiliate or parent corporation thereof.

Production facility means:

(1) Any equipment or device capable of producing special nuclear material in such quantity as to be of significance to the common defense and security or in such manner as to affect the health and safety of the public; or

(2) Any important component part especially designed for such equipment or device.

(3) For the purposes of this part, equipment and devices described in paragraphs (1) and (2) of this definition include only:

(i) Government uranium isotope enrichment equipment or devices and any other uranium isotope enrichment equipment or devices that use related technology provided by the Government; or

(ii) Government plutonium production reactors, isotope enrichment equipment or devices, and separation and purification equipment or devices and other such equipment or devices that use related technology provided by the Government.

Reviewing Official means an individual authorized under § 1017.14(a) to make a determination, based on guidance, that a document or material contains UCNI.

Routine access means access to UCNI granted by an Authorized Individual to an individual eligible to receive UCNI under § 1017.20 in order to perform official duties or other Government-authorized activities.

Secretary means the Secretary of Energy.

Special nuclear material means:

(1) Plutonium, uranium enriched in the isotope 233 or in the isotope 235, and any other material which DOE or the Nuclear Regulatory Commission, pursuant to the provisions of section 51 of the Atomic Energy Act (42 U.S.C. 2071), determines to be special nuclear material, but does not include source material; or

(2) Any material artificially enriched by any of the foregoing, but does not include source material.

Unauthorized dissemination means the intentional or negligent transfer of UCNI to any person other than an Authorized Individual or a person granted limited access to UCNI under § 1017.21.

Unclassified Controlled Nuclear Information or UCNI means certain unclassified Government information concerning nuclear facilities, materials, weapons, and components whose dissemination is controlled under section 148 of the Atomic Energy Act and this part.

Utilization facility means:

(1) Any equipment or device, or any important component part especially designed for such equipment or device, except for a nuclear weapon, that is capable of making use of special nuclear material in such quantity as to be of significance to the common defense and security or in such manner as to affect the health and safety of the public. For the purposes of this part, such equipment or devices include only Government equipment or devices that use special nuclear material in the research, development, production, or testing of nuclear weapons, nuclear weapon components, or nuclear material capable of being used in nuclear weapons; or

(2) Any equipment or device, or any important component part especially designed for such equipment or device, except for a nuclear weapon, that is peculiarly adapted for making use of nuclear energy in such quantity as to be of significance to the common defense and security or in such manner as to affect the health and safety of the public. For the purposes of this part, such equipment or devices include only:

(i) Naval propulsion reactors;

(ii) Military reactors and power sources that use special nuclear material;

(iii) Tritium production reactors; and,

(iv) Government research reactors.

§ 1017.5 Requesting a deviation.

(a) Any person may request a deviation, or condition that diverges from the norm and that is categorized as:

(1) A variance (i.e., an approved condition that technically varies from a requirement in these regulations);

(2) A waiver (i.e., an approved nonstandard condition that deviates from a requirement in these regulations and which, if uncompensated, would create a potential or real vulnerability); or

(3) An exception (i.e., an approved deviation from a requirement in these regulations for which DOE accepts the risk of a safeguards and security vulnerability) according to the degree of risk involved.

(b) In writing, the person must:

(1) Identify the specific requirement for which the deviation is being requested;

(2) Explain why the deviation is needed; and,

(3) If appropriate, describe the alternate or equivalent means for meeting the requirement.

(c) DOE employees must submit such requests according to internal directives. DOE contractors must submit such requests according to directives incorporated into their contracts. Other individuals must submit such requests to the Office of Classification, Office of Environment, Health, Safety and Security, U.S. Department of Energy, 1000 Independence Ave., SW., Washington, DC 20585-1290. The Office of Classification's decision must be made within 30 days.

[73 FR 32641, June 10, 2008, as amended at 88 FR 41294, June 26, 2023]

Subpart B Initially Determining What Information Is Unclassified Controlled Nuclear Information

§ 1017.6 Authority.

The Secretary, or his or her designee, determines whether information is UCNI. These determinations are incorporated into guidance that each Reviewing Official and Denying Official consults in his or her review of a document or material to decide whether the document or material contains UCNI.

§ 1017.7 Criteria.

To be identified as UCNI, the information must meet each of the following criteria:

(a) The information must be Government information as defined in § 1017.4;

(b) The information must concern atomic energy defense programs as defined in § 1017.4;

(c) The information must fall within the scope of at least one of the three subject areas eligible to be UCNI in § 1017.8;

(d) The information must meet the adverse effect test described in § 1017.10; and

(e) The information must not be exempt from being UCNI under § 1017.11.

§ 1017.8 Subject areas eligible to be Unclassified Controlled Nuclear Information.

To be eligible for identification as UCNI, information must concern at least one of the following categories:

(a) The design of production or utilization facilities as defined in this part;

(b) Security measures (including security plans, procedures, and equipment) for the physical protection of production or utilization facilities or nuclear material, regardless of its physical state or form, contained in these facilities or in transit; or

(c) The design, manufacture, or utilization of nuclear weapons or components that were once classified as Restricted Data, as defined in section 11y. of the Atomic Energy Act.

§ 1017.9 Nuclear material determinations.

(a) The Secretary may determine that a material other than special nuclear material, byproduct material, or source material as defined by the Atomic Energy Act is included within the scope of the term “nuclear material” if it meets the following criteria:

(1) The material is used in the production, testing, utilization, or assembly of nuclear weapons or components of nuclear weapons; and

(2) Unauthorized acquisition of the material could reasonably be expected to result in a significant adverse effect on the health and safety of the public or the common defense and security because the specific material:

(i) Could be used as a hazardous radioactive environmental contaminant; or

(ii) Could be of significant assistance in the illegal production of a nuclear weapon.

(b) Designation of a material as a nuclear material under paragraph (a) of this section does not make all information about the material UCNI. Specific information about the material must still meet each of the criteria in § 1017.7 prior to its being identified and controlled as UCNI.

§ 1017.10 Adverse effect test.

In order for information to be identified as UCNI, it must be determined that the unauthorized dissemination of the information under review could reasonably be expected to result in a significant adverse effect on the health and safety of the public or the common defense and security by significantly increasing the likelihood of:

(a) Illegal production of a nuclear weapon; or

(b) Theft, diversion, or sabotage of nuclear material, equipment, or facilities.

§ 1017.11 Information exempt from being Unclassified Controlled Nuclear Information.

Information exempt from this part includes:

(a) Information protected from disclosure under section 147 of the Atomic Energy Act (42 U.S.C. 2167) that is identified as Safeguards Information and controlled by the United States Nuclear Regulatory Commission;

(b) Basic scientific information (i.e., information resulting from research directed toward increasing fundamental scientific knowledge or understanding rather than any practical application of that knowledge);

(c) Radiation exposure data and all other personal health information; and,

(d) Information concerning the transportation of low level radioactive waste.

§ 1017.12 Prohibitions on identifying Unclassified Controlled Nuclear Information.

Information, documents, and material must not be identified as being or containing UCNI in order to:

(a) Conceal violations of law, inefficiency, or administrative error;

(b) Prevent embarrassment to a person or organization;

(c) Restrain competition; or,

(d) Prevent or delay the release of any information that does not properly qualify as UCNI.

§ 1017.13 Report concerning determinations.

The Office of Classification or successor office shall issue a report by the end of each quarter that identifies any new information that has been determined for the first time to be UCNI during the previous quarter, explains how each such determination meets the criteria in § 1017.7, and explains why each such determination protects from disclosure only the minimum amount of information necessary to protect the health and safety of the public or the common defense and security. A copy of the report may be obtained by writing to the Office of Classification, Office of Environment, Health, Safety and Security, U.S. Department of Energy, 1000 Independence Ave., SW., Washington, DC 20585-1290.

[73 FR 32641, June 10, 2008, as amended at 88 FR 41294, June 26, 2023]

Subpart C Review of a Document or Material for Unclassified Controlled Nuclear Information

§ 1017.14 Designated officials.

(a) Reviewing Official—(1) Authority. A Reviewing Official with cognizance over the information contained in a document or material is authorized to determine whether the document or material contains UCNI based on applicable guidance. A Reviewing Official marks or authorizes the marking of the document or material as specified in § 1017.16.

(2) Request for designation. Procedures for requesting that a DOE Federal or contractor employee be designated as a Reviewing Official are contained in Departmental directives issued by the Secretary. DOE may also designate other Government agency employees, contractors, or other individuals granted routine access under § 1017.20 as Reviewing Officials.

(3) Designation. Prior to being designated as a Reviewing Official, each employee must receive training approved by DOE that covers the requirements in these regulations and be tested on his or her proficiency in using applicable UCNI guidance. Upon successful completion of the training and test, he or she is designated as a Reviewing Official only while serving in his or her current position for a maximum of 3 years. The employee does not automatically retain the authority when he or she leaves his or her current position. The employee cannot delegate this authority to anyone else, and the authority may not be assumed by another employee acting in the employee's position. At the end of 3 years, if the position still requires the authority, the employee must be retested and redesignated by DOE as a Reviewing Official.

(b) Individuals approved to use DOE or joint DOE classification guidance—(1) Authority. Other Government agency employees who are approved by DOE or another Government agency to use classification guidance developed by DOE or jointly by DOE and another Government agency may also be approved to review documents for UCNI and to make UCNI determinations. This authority is limited to the UCNI subject areas contained in the specific classification guidance that the individual has been approved to use.

(2) Designation. Individuals must be designated this authority in writing by the appropriate DOE or other Government agency official with cognizance over the specific DOE or joint DOE classification guidance.

(c) Denying Official—(1) Authority. A DOE Denying Official for unclassified information with cognizance over the information contained in a document is authorized to deny a request made under statute (e.g., the FOIA, the Privacy Act) or the mandatory review provisions of Executive Order 12958, as amended, “Classified National Security Information,” and its successor orders, for all or any portion of the document that contains UCNI. The Denying Official bases his or her denial on applicable guidance, ensuring that the Reviewing Official who determined that the document contains UCNI correctly interpreted and applied the guidance.

(2) Designation. Information on the designation of DOE Denying Officials is contained in 10 CFR Part 1004, Freedom of Information (see definition of the term “Authorizing or Denying Official” in § 1004.2).

§ 1017.15 Review process.

(a) Reviewing documents for UCNI. Anyone who originates or possesses a document that he or she thinks may contain UCNI must send the document to a Reviewing Official for a determination before it is finalized, sent outside of his or her organization, or filed. If the originator or possessor must send the document outside of his or her organization for the review, he or she must mark the front of the document with “Protect as UCNI Pending Review” and must transmit the document in accordance with the requirements in § 1017.27. The Reviewing Official must first determine whether the document is widely disseminated in the public domain, which means that the document under review is publicly available from a Government technical information service or depository library, for example, or that it can be found in a public library or an open literature source, or it can be accessed on the Internet using readily available search methods.

(1) If the document is determined to be widely disseminated in the public domain, it cannot be controlled as UCNI. The Reviewing Official returns the document to the person who sent it to the Reviewing Official and informs him or her why the document cannot be controlled as UCNI. This does not preclude control of the same information as UCNI if it is contained in another document that is not widely disseminated.

(2) If the document is not determined to be widely disseminated in the public domain, the Reviewing Official evaluates the information in the document using guidance to determine whether the document contains UCNI. If the Reviewing Official determines that the document does contain UCNI, the Reviewing Official marks or authorizes the marking of the document as specified in § 1017.16. If the Reviewing Official determines that the document does not contain UCNI, the Reviewing Official returns the document to the person who sent it and informs him or her that the document does not contain UCNI. For documentation purposes, the Reviewing Official may mark or authorize the marking of the document as specified in § 1017.17(b).

(3) If no applicable guidance exists, but the Reviewing Official thinks the information should be identified as UCNI, then the Reviewing Official must send the document to the appropriate official identified in applicable DOE directives issued by the Secretary or his or her designee. The Reviewing Official should also include a written recommendation as to why the information should be identified as UCNI.

(b) Review exemption for documents in files. Any document that was permanently filed prior to May 22, 1985, is not required to be reviewed for UCNI while in the files or when retrieved from the files for reference, inventory, or similar purposes as long as the document will be returned to the files and is not accessible by individuals who are not Authorized Individuals for the UCNI contained in the document. However, when a document that is likely to contain UCNI is removed from the files for dissemination within or outside of the immediate organization, it must be reviewed by a Reviewing Official with cognizance over the information.

(c) Reviewing material for UCNI. Anyone who produces or possesses material that he or she thinks may contain or reveal UCNI must consult with a Reviewing Official for a determination. If the Reviewing Official determines that the material does contain or reveal UCNI, the Reviewing Official marks or authorizes the marking of the material as specified in § 1017.16(b).

§ 1017.16 Unclassified Controlled Nuclear Information markings on documents or material.

(a) Marking documents. If a Reviewing Official determines that a document contains UCNI, the Reviewing Official must mark or authorize the marking of the document as described in this section.

(1) Front marking. The following marking must appear on the front of the document:

Unclassified Controlled Nuclear Information Not for Public Dissemination

Unauthorized dissemination subject to civil and criminal sanctions under section 148 of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2168). Reviewing Official: (Name/Organization) Date: Guidance Used:

(2) Page marking. The marking “Unclassified Controlled Nuclear Information” must be placed on the bottom of the front of the document and on the bottom of each interior page of the document that contains text or if more convenient, on the bottom of only those interior pages that contain UCNI. The page marking must also be placed on the back of the last page. If space limitations do not allow for use of the full page marking, the acronym “UCNI” may be used as the page marking.

(3) Classified documents. UCNI front and page markings are not applied to a classified document that also contains UCNI. If a classified document is portion marked, the acronym “UCNI” is used to indicate those unclassified portions that contain UCNI.

(4) Obsolete “May Contain UCNI” marking. The “May Contain UCNI” marking is no longer used. Any document marked with the “May Contain UCNI” marking is considered to contain UCNI and must be protected accordingly until a Reviewing Official or Denying Official determines otherwise. The obsolete “May Contain UCNI” marking reads as follows:

Not for Public Dissemination May contain Unclassified Controlled Nuclear Information subject to section 148 of the Atomic Energy Act of 1954 (42 U.S.C. 2168). Approval by the Department of Energy prior to release is required.

(b) Marking material. If possible, material containing or revealing UCNI must be marked as described in § 1017.16(a)(1). If space limitations do not allow for use of the full marking in § 1017.16(a)(1), the acronym “UCNI” may be used.

§ 1017.17 Determining that a document or material no longer contains or does not contain Unclassified Controlled Nuclear Information.

(a) Document or material no longer contains UCNI. A Reviewing Official with cognizance over the information in a document or material marked as containing UCNI may determine that the document or material no longer contains UCNI. A Denying Official may also determine that such a document or material no longer contains UCNI. The official making this determination must base it on applicable guidance and must ensure that any UCNI markings are crossed out (for documents) or removed (for material). The official marks or authorizes the marking of the document (or the material, if space allows) as follows:

Does Not Contain Unclassified Controlled Nuclear Information

Reviewing/Denying Official: (Name and organization) Date:

(b) Document or material does not contain UCNI. A Reviewing Official with cognizance over the information in a document or material may confirm that an unmarked document or material does not contain UCNI based on applicable guidance. No UCNI markings are required in this case; however, for documentation purposes, the Reviewing Official may mark or may authorize the marking of the document or material with the same marking used in § 1017.17(a).

§ 1017.18 Joint documents or material.

If a document or material marked as containing UCNI is under consideration for decontrol and falls under the cognizance of another DOE organization or other Government agency, the Reviewing Official or Denying Official must coordinate the decontrol review with that DOE organization or other Government agency. Any disagreement concerning the control or decontrol of any document or material that contains UCNI that was originated by or for DOE or another Government agency is resolved by the Secretary or his or her designee.

Subpart D Access to Unclassified Controlled Nuclear Information

§ 1017.19 Access limitations.

A person may only have access to UCNI if he or she has been granted routine access by an Authorized Individual (see § 1017.20) or limited access by the DOE Program Secretarial Officer or NNSA Deputy or Associate Administrator with cognizance over the UCNI (see § 1017.21). The Secretary, or his or her designee, may impose additional administrative controls concerning the granting of routine or limited access to UCNI to a person who is not a U.S. citizen.

§ 1017.20 Routine access.

(a) Authorized Individual. The Reviewing Official who determines that a document or material contains UCNI is the initial Authorized Individual for that document or material. An Authorized Individual, for UCNI in his or her possession or control, may determine that another person is an Authorized Individual who may be granted access to the UCNI, subject to limitations in paragraph (b) of this section, and who may further disseminate the UCNI under the provisions of this section.

(b) Requirements for routine access. To be eligible for routine access to UCNI, the person must have a need to know the UCNI in order to perform official duties or other Government-authorized activities and must be:

(1) A U.S. citizen who is:

(i) An employee of any branch of the Federal Government, including the U.S. Armed Forces;

(ii) An employee or representative of a State, local, or Indian tribal government;

(iii) A member of an emergency response organization;

(iv) An employee of a Government contractor or a consultant, including those contractors or consultants who need access to bid on a Government contract;

(v) A member of Congress or a staff member of a congressional committee or of an individual member of Congress;

(vi) A Governor of a State, his or her designated representative, or a State government official;

(vii) A member of a DOE advisory committee; or,

(viii) A member of an entity that has entered into a formal agreement with the Government, such as a Cooperative Research and Development Agreement or similar arrangement; or,

(2) A person who is not a U.S. citizen but who is:

(i) A Federal Government employee or a member of the U.S. Armed Forces;

(ii) An employee of a Federal Government contractor or subcontractor;

(iii) A Federal Government consultant;

(iv) A member of a DOE advisory committee;

(v) A member of an entity that has entered into a formal agreement with the Government, such as a Cooperative Research and Development Agreement or similar arrangement;

(vi) An employee or representative of a State, local, or Indian tribal government; or,

(vii) A member of an emergency response organization when responding to an emergency; or,

(3) A person who is not a U.S. citizen but who needs to know the UCNI in conjunction with an activity approved by the DOE Program Secretarial Officer or NNSA Deputy or Associate Administrator with cognizance over the UCNI.

§ 1017.21 Limited access.

(a) A person who is not eligible for routine access to specific UCNI under § 1017.20 may request limited access to such UCNI by sending a written request to the DOE Program Secretarial Officer or NNSA Deputy or Associate Administrator with cognizance over the information. The written request must include the following:

(1) The name, current residence or business address, birthplace, birth date, and country of citizenship of the person submitting the request;

(2) A description of the specific UCNI for which limited access is being requested;

(3) A description of the purpose for which the UCNI is needed; and,

(4) Certification by the requester that he or she:

(i) Understands and will follow these regulations; and

(ii) Understands that he or she is subject to the civil and criminal penalties under Subpart F of this part.

(b) The decision whether to grant the request for limited access is based on the following criteria:

(1) The sensitivity of the UCNI for which limited access is being requested;

(2) The approving official's evaluation of the likelihood that the requester will disseminate the UCNI to unauthorized individuals; and,

(3) The approving official's evaluation of the likelihood that the requester will use the UCNI for illegal purposes.

(c) Within 30 days of receipt of the request for limited access, the appropriate DOE Program Secretarial Officer or NNSA Deputy or Associate Administrator must notify the requester if limited access is granted or denied, or if the determination cannot be made within 30 days, of the date when the determination will be made.

(d) A person granted limited access to specific UCNI is not an Authorized Individual and may not further disseminate the UCNI to anyone.

Subpart E Physical Protection Requirements

§ 1017.22 Notification of protection requirements.

(a) An Authorized Individual who grants routine access to specific UCNI under § 1017.20 to a person who is not an employee or contractor of the DOE must notify the person receiving the UCNI of protection requirements described in this subpart and any limitations on further dissemination.

(b) A DOE Program Secretarial Officer or NNSA Deputy or Associate Administrator who grants limited access to specific UCNI under § 1017.21 must notify the person receiving the UCNI of protection requirements described in this subpart and any limitations on further dissemination.

§ 1017.23 Protection in use.

An Authorized Individual or a person granted limited access to UCNI under § 1017.21 must maintain physical control over any document or material marked as containing UCNI that is in use to prevent unauthorized access to it.

§ 1017.24 Storage.

A document or material marked as containing UCNI must be stored to preclude unauthorized disclosure. When not in use, documents or material containing UCNI must be stored in locked receptacles (e.g., file cabinet, desk drawer), or if in secured areas or facilities, in a manner that would prevent inadvertent access by an unauthorized individual.

§ 1017.25 Reproduction.

A document marked as containing UCNI may be reproduced without the permission of the originator to the minimum extent necessary consistent with the need to carry out official duties, provided the reproduced document is marked and protected in the same manner as the original document.

§ 1017.26 Destruction.

A document marked as containing UCNI must be destroyed, at a minimum, by using a cross-cut shredder that produces particles no larger than 1/4-inch wide and 2 inches long. Other comparable destruction methods may be used. Material containing or revealing UCNI must be destroyed according to agency directives.

§ 1017.27 Transmission.

(a) Physically transmitting UCNI documents or material. (1) A document or material marked as containing UCNI may be transmitted by:

(i) U.S. First Class, Express, Certified, or Registered mail;

(ii) Any means approved for transmission of classified documents or material;

(iii) An Authorized Individual or person granted limited access under § 1017.21 as long as physical control of the package is maintained; or,

(iv) Internal mail services.

(2) The document or material must be packaged to conceal the presence of the UCNI from someone who is not authorized access. A single, opaque envelope or wrapping is sufficient for this purpose. The address of the recipient and the sender must be indicated on the outside of the envelope or wrapping along with the words “TO BE OPENED BY ADDRESSEE ONLY.”

(b) Transmitting UCNI documents over telecommunications circuits. Encryption algorithms that comply with all applicable Federal laws, regulations, and standards for the protection of unclassified controlled information must be used when transmitting UCNI over a telecommunications circuit (including the telephone, facsimile, radio, e-mail, Internet).

§ 1017.28 Processing on Automated Information Systems (AIS).

UCNI may be processed or produced on any AIS that complies with the guidance in OMB Circular No. A-130, Revised, Transmittal No. 4, Appendix III, “Security of Federal Automated Information Resources,” or is certified for classified information.

Subpart F Violations

§ 1017.29 Civil penalty.

(a) Regulations. Any person who violates a UCNI security requirement of any of the following is subject to a civil penalty under this part:

(1) 10 CFR Part 1017—Identification and Protection of Unclassified Controlled Nuclear Information; or

(2) Any other DOE regulation related to the safeguarding or security of UCNI if the regulation provides that violation of its provisions may result in a civil penalty pursuant to section 148 of the Act.

(b) Compliance order. If, without violating a requirement of any regulation issued under section 148, a person by an act or omission causes, or creates a risk of, the loss, compromise or unauthorized disclosure of UCNI, the Secretary may issue a compliance order to that person requiring the person to take corrective action and notifying the person that violation of the compliance order is subject to a notice of violation and assessment of a civil penalty. If a person wishes to contest the compliance order, the person must file a notice of appeal with the Secretary within 15 days of receipt of the compliance order.

(c) Amount of penalty. The Director may propose imposition of a civil penalty for violation of a requirement of a regulation under paragraph (a) of this section or a compliance order issued under paragraph (b) of this section, not to exceed $337,966 for each violation.

(d) Settlements. The Director may enter into a settlement, with or without conditions, of an enforcement proceeding at any time if the settlement is consistent with the objectives of DOE's UCNI protection requirements.

(e) Enforcement conference. The Director may convene an informal conference to discuss any situation that might be a violation of the Act, its significance and cause, any correction taken or not taken by the person, any mitigating or aggravating circumstances, and any other useful information. The Director may compel a person to attend the conference. This conference will not normally be open to the public and there shall be no transcript.

(f) Investigations. The Director may conduct investigations and inspections relating to the scope, nature and extent of compliance by a person with DOE security requirements specified in these regulations and take such action as the Director deems necessary and appropriate to the conduct of the investigation or inspection, including signing, issuing and serving subpoenas.

(g) Preliminary notice of violation. (1) In order to begin a proceeding to impose a civil penalty under this part, the Director shall notify the person by a written preliminary notice of violation sent by certified mail, return receipt requested, of:

(i) The date, facts, and nature of each act or omission constituting the alleged violation;

(ii) The particular provision of the regulation or compliance order involved in each alleged violation;

(iii) The proposed remedy for each alleged violation, including the amount of any civil penalty proposed;

(iv) The right of the person to submit a written reply to the Director within 30 calendar days of receipt of such preliminary notice of violation; and,

(v) The fact that upon failure of the person to pay any civil penalty imposed, the penalty may be collected by civil action.

(2) A reply to a preliminary notice of violation must contain a statement of all relevant facts pertaining to an alleged violation. The reply must:

(i) State any facts, explanations, and arguments that support a denial of the alleged violation;

(ii) Demonstrate any extenuating circumstances or other reason why a proposed remedy should not be imposed or should be mitigated;

(iii) Discuss the relevant authorities that support the position asserted, including rulings, regulations, interpretations, and previous decisions issued by DOE;

(iv) Furnish full and complete answers to any questions set forth in the preliminary notice; and

(v) Include copies of all relevant documents.

(3) If a person fails to submit a written reply within 30 calendar days of receipt of a preliminary notice of violation:

(i) The person relinquishes any right to appeal any matter in the preliminary notice; and

(ii) The preliminary notice, including any remedies therein, constitutes a final order.

(4) The Director, at the request of a person notified of an alleged violation, may extend for a reasonable period the time for submitting a reply or a hearing request letter.

(h) Final notice of violation. (1) If a person submits a written reply within 30 calendar days of receipt of a preliminary notice of violation, the Director must make a final determination whether the person violated or is continuing to violate an UCNI security requirement.

(2) Based on a determination by the Director that a person has violated or is continuing to violate an UCNI security requirement, the Director may issue to the person a final notice of violation that concisely states the determined violation, the amount of any civil penalty imposed, and further actions necessary by or available to the person. The final notice of violation also must state that the person has the right to submit to the Director, within 30 calendar days of the receipt of the notice, a written request for a hearing under paragraph (i) of this section.

(3) The Director must send a final notice of violation by certified mail, return receipt requested, within 30 calendar days of the receipt of a reply.

(4) Subject to paragraphs (h)(7) and (h)(8) of this section, the effect of final notice shall be:

(i) If a final notice of violation does not contain a civil penalty, it shall be deemed a final order 15 days after the final notice is issued.

(ii) If a final notice of violation contains a civil penalty, the person must submit to the Director within 30 days after the issuance of the final notice:

(A) A waiver of further proceedings; or

(B) A request for an on-the-record hearing under paragraph (i) of this section.

(5) If a person waives further proceedings, the final notice of violation shall be deemed a final order enforceable against the person. The person must pay the civil penalty set forth in the notice of violation within 60 days of the filing of waiver unless the Director grants additional time.

(6) If a person files a request for an on-the-record hearing, then the hearing process commences.

(7) The Director may amend the final notice of violation at any time before the time periods specified in paragraphs (h)(4)(i) or (h)(4)(ii) of this section expire. An amendment shall add 15 days to the time period under paragraph (h)(4) of this section.

(8) The Director may withdraw the final notice of violation, or any part thereof, at any time before the time periods specified in paragraphs (h)(4)(i) or (h)(4)(ii) of this section expire.

(i) Hearing. (1) Any person who receives a final notice of violation under paragraph (h) of this section may request a hearing concerning the allegations contained in the notice. The person must mail or deliver any written request for a hearing to the Director within 30 calendar days of receipt of the final notice of violation.

(2) Upon receipt from a person of a written request for a hearing, the Director shall:

(i) Appoint a Hearing Counsel; and

(ii) Select an administrative law judge appointed under 5 U.S.C. 3105, to serve as Hearing Officer.

(j) Hearing Counsel. The Hearing Counsel:

(1) Represents DOE;

(2) Consults with the person or the person's counsel prior to the hearing;

(3) Examines and cross-examines witnesses during the hearing; and

(4) Enters into a settlement of the enforcement proceeding at any time if settlement is consistent with the objectives of the Act and DOE security requirements.

(k) Hearing Officer. The Hearing Officer:

(1) Is responsible for the administrative preparations for the hearing;

(2) Convenes the hearing as soon as is reasonable;

(3) Administers oaths and affirmations;

(4) Issues subpoenas, at the request of either party or on the Hearing Officer's motion;

(5) Rules on offers of proof and receives relevant evidence;

(6) Takes depositions or has depositions taken when the ends of justice would be served;

(7) Conducts the hearing in a manner which is fair and impartial;

(8) Holds conferences for the settlement or simplification of the issues by consent of the parties;

(9) Disposes of procedural requests or similar matters;

(10) Requires production of documents; and,

(11) Makes an initial decision under paragraph (n) of this section.

(l) Rights of the person at the hearing. The person may:

(1) Testify or present evidence through witnesses or by documents;

(2) Cross-examine witnesses and rebut records or other physical evidence, except as provided in paragraph (m)(4) of this section;

(3) Be present during the entire hearing, except as provided in paragraph (m)(4) of this section; and

(4) Be accompanied, represented, and advised by counsel of the person's choosing.

(m) Conduct of the hearing. (1) DOE shall make a transcript of the hearing.

(2) Except as provided in paragraph (m)(4) of this section, the Hearing Officer may receive any oral or documentary evidence, but shall exclude irrelevant, immaterial, or unduly repetitious evidence.

(3) Witnesses shall testify under oath and are subject to cross-examination, except as provided in paragraph (m)(4) of this section.

(4) The Hearing Officer must use procedures appropriate to safeguard and prevent unauthorized disclosure of classified information, UCNI, or any other information protected from public disclosure by law or regulation, with minimum impairment of rights and obligations under this part. The UCNI status shall not, however, preclude information from being introduced into evidence. The Hearing Officer may issue such orders as may be necessary to consider such evidence in camera including the preparation of a supplemental initial decision to address issues of law or fact that arise out of that portion of the evidence that is protected.

(5) DOE has the burden of going forward with and of proving by a preponderance of the evidence that the violation occurred as set forth in the final notice of violation and that the proposed civil penalty is appropriate. The person to whom the final notice of violation has been addressed shall have the burden of presenting and of going forward with any defense to the allegations set forth in the final notice of violation. Each matter of controversy shall be determined by the Hearing Officer upon a preponderance of the evidence.

(n) Initial decision. (1) The Hearing Officer shall issue an initial decision as soon as practicable after the hearing. The initial decision shall contain findings of fact and conclusions regarding all material issues of law, as well as reasons therefor. If the Hearing Officer determines that a violation has occurred and that a civil penalty is appropriate, the initial decision shall set forth the amount of the civil penalty based on:

(i) The nature, circumstances, extent, and gravity of the violation or violations;

(ii) The violator's ability to pay;

(iii) The effect of the civil penalty on the person's ability to do business;

(iv) Any history of prior violations;

(v) The degree of culpability; and,

(vi) Such other matters as justice may require.

(2) The Hearing Officer shall serve all parties with the initial decision by certified mail, return receipt requested. The initial decision shall include notice that it constitutes a final order of DOE 30 days after the filing of the initial decision unless the Secretary files a Notice of Review. If the Secretary files a Notice of Review, he shall file a final order as soon as practicable after completing his review. The Secretary, at his discretion, may order additional proceedings, remand the matter, or modify the amount of the civil penalty assessed in the initial decision. DOE shall notify the person of the Secretary's action under this paragraph in writing by certified mail, return receipt requested. The person against whom the civil penalty is assessed by the final order shall pay the full amount of the civil penalty assessed in the final order within 30 days unless otherwise agreed by the Director.

(o) Collection of penalty. (1) The Secretary may request the Attorney General to institute a civil action to collect a penalty imposed under this section.

(2) The Attorney General has the exclusive power to uphold, compromise or mitigate, or remit any civil penalty imposed by the Secretary under this section and referred to the Attorney General for collection.

(p) Direction to NNSA. (1) Notwithstanding any other provision of this part, the NNSA Administrator, rather than the Director, signs, issues, serves, or takes the following actions that direct NNSA employees, contractors, subcontractors, or employees of such NNSA contractors or subcontractors:

(i) Subpoenas;

(ii) Orders to compel attendance;

(iii) Disclosures of information or documents obtained during an investigation or inspection;

(iv) Preliminary notices of violation; and,

(v) Final notice of violations.

(2) The Administrator shall act after consideration of the Director's recommendation. If the Administrator disagrees with the Director's recommendation, and the disagreement cannot be resolved by the two officials, the Director may refer the matter to the Deputy Secretary for resolution.

[73 FR 32641, June 10, 2008, as amended at 74 FR 66033, Dec. 14, 2009; 79 FR 20, Jan. 2, 2014; 81 FR 41796, June 28, 2016; 81 FR 96353, Dec. 30, 2016; 83 FR 1293, Jan. 11, 2018; 83 FR 66084, Dec. 26, 2018; 85 FR 831, Jan. 8, 2020; 86 FR 2957, Jan. 14, 2021; 87 FR 1065, Jan. 10, 2022; 88 FR 2194, Jan. 13, 2023; 89 FR 1029, Jan. 9, 2024; 89 FR 105407, Dec. 27, 2024]

§ 1017.30 Criminal penalty.

Any person who violates section 148 of the Atomic Energy Act or any regulation or order of the Secretary issued under section 148 of the Atomic Energy Act, including these regulations, may be subject to a criminal penalty under section 223 of the Atomic Energy Act (42 U.S.C. 2273). In such case, the Secretary shall refer the matter to the Attorney General for investigation and possible prosecution.

[73 FR 32641, June 10, 2008, as amended at 81 FR 41796, June 28, 2016; 81 FR 96353, Dec. 30, 2016]

PART 1021 NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES

Authority: 42 U.S.C. 7101 et seq.; 42 U.S.C. 4321 et seq.; 50 U.S.C. 2401 et seq.

Source: 90 FR 29682, July 3, 2025, unless otherwise noted.

§ 1021.100 Purpose.

The purpose of this part is to establish certain procedures that the Department of Energy (DOE) shall use to comply with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4332(2)), as amended. This part applies to all Departmental Elements.

§ 1021.101 Definitions.

As used in these implementing procedures, terms have the meanings provided in NEPA section 111, 42 U.S.C. 4336e. In addition:

CERCLA-excluded petroleum and natural gas products means petroleum, including crude oil or any fraction thereof, that is not otherwise specifically listed or designated as a hazardous substance under section 101(14) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. 9601.101(14)) and natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel or of pipeline quality (or mixtures of natural gas and such synthetic gas).

Contaminant means a substance identified within the definition of contaminant in section 101(33) of CERCLA (42 U.S.C. 9601.101(33)).

Hazardous substance means a substance identified within the definition of hazardous substances in section 101(14) of CERCLA (42 U.S.C. 9601.101(14)). Radionuclides are hazardous substances through their listing under section 112 of the Clean Air Act (42 U.S.C. 7412) (40 CFR part 61, subpart H).

Pollutant means a substance identified within the definition of pollutant in section 101(33) of CERCLA (42 U.S.C. 9601.101(33)).

§ 1021.102 Application of categorical exclusions (categories of actions that normally do not require EAs or EISs).

(a) The actions listed in appendices A and B to this part are categories of actions that DOE has determined do not normally have a significant effect on the human environment (categorical exclusions).

(b) To find that a proposal is excluded pursuant to a categorical exclusion, DOE shall determine the following:

(1) The proposal fits within a category of actions that is listed in appendix B to this part;

(2) There are no extraordinary circumstances related to the proposal that may affect the significance of the environmental effects of the proposal. Extraordinary circumstances are unique situations presented by specific proposals, including, but not limited to, scientific controversy about the environmental effects of the proposal; uncertain effects or effects involving unique or unknown risks; and unresolved conflicts concerning alternative uses of available resources; and

(c) All categorical exclusions may be applied by any organizational element of the Department of Energy. The sectional divisions in appendix B to this part are solely for purposes of organization of that appendix and are not intended to be limiting.

(d) A category of actions includes activities foreseeably necessary to proposals encompassed within the category of actions (such as award of implementing grants and contracts, site preparation, purchase and installation of equipment, and associated transportation activities).

(e) Categorical exclusion determinations for actions listed in appendix B shall be documented and made available to the public by posting online, generally within two weeks of the determination, unless additional time is needed in order to review and protect classified information, “confidential business information,” or other information that DOE would not disclose pursuant to the Freedom of Information Act (FOIA) (5 U.S.C. 552). Posted categorical exclusion determinations shall not disclose classified information, “confidential business information,” or other information that DOE would not disclose pursuant to FOIA.

(f) Proposed recurring activities to be undertaken during a specified time period, such as routine maintenance activities for a year, may be addressed in a single categorical exclusion determination after considering the potential aggregated impacts.

(g) The following clarifications are provided to assist in the appropriate application of categorical exclusions that employ the terms or phrases:

(1) “Previously disturbed or developed” refers to land that has been changed such that its functioning ecological processes have been and remain altered by human activity. The phrase encompasses areas that have been transformed from natural cover to non-native species or a managed state, including, but not limited to, utility and electric power transmission corridors and rights-of-way, and other areas where active utilities and currently used roads are readily available.

(2) DOE considers terms such as “small” and “small-scale” in the context of the particular proposal, including its proposed location. In assessing whether a proposed action is small, in addition to the actual magnitude of the proposal, DOE considers factors such as industry norms, the relationship of the proposed action to similar types of development in the vicinity of the proposed action, and expected outputs of emissions or waste. When considering the physical size of a proposed facility, for example, DOE would review the surrounding land uses, the scale of the proposed facility relative to existing development, and the capacity of existing roads and other infrastructure to support the proposed action.

§ 1021.103 Emergency actions.

DOE may take an action without observing all provisions of DOE's NEPA implementing procedures in emergency situations that demand immediate action. DOE shall consult with CEQ as soon as possible regarding alternative arrangements for emergency actions having significant environmental impacts. DOE shall document, including publishing a notice in the Federal Register, emergency actions covered by this paragraph within 30-days after such action occurs; this documentation shall identify any adverse impacts from the actions taken, further mitigation necessary, and any NEPA documents that may be required.

Appendix A to Part 1021 Administrative and Routine Actions Excepted From NEPA Review

Table of Contents

A1 Routine DOE business actions

A2 Clarifying or administrative contract actions

A3 Certain actions by Office of Hearings and Appeals

A4 Interpretations and rulings for existing regulations

A5 Interpretive rulemakings with no change in environmental effect

A6 Procedural rulemakings

A7 [Reserved]

A8 Awards of certain contracts

A9 Information gathering, analysis, and dissemination

A10 Reports and recommendations on non-DOE legislation

A11 Technical advice and assistance to organizations

A12 Emergency preparedness planning

A13 Procedural documents

A14 Approval of technical exchange arrangements

A15 International agreements for energy research and development

A1 Routine DOE Business Actions

Routine actions necessary to support the normal conduct of DOE business limited to administrative, financial, and personnel actions.

A2 Clarifying or Administrative Contract Actions

Contract interpretations, amendments, and modifications that are clarifying or administrative in nature.

A3 Certain Actions by Office of Hearings and Appeals

Adjustments, exceptions, exemptions, appeals and stays, modifications, or rescissions of orders issued by the Office of Hearings and Appeals.

A4 Interpretations and Rulings for Existing Regulations

Interpretations and rulings with respect to existing regulations, or modifications or rescissions of such interpretations and rulings.

A5 Interpretive Rulemakings With No Change in Environmental Effect

Rulemakings interpreting or amending an existing rule or regulation that does not change the environmental effect of the rule or regulation being amended.

A6 Procedural Rulemakings

Rulemakings that are strictly procedural, including, but not limited to, rulemaking (under 48 CFR chapter 9) establishing procedures for technical and pricing proposals and establishing contract clauses and contracting practices for the purchase of goods and services, and rulemaking (under 10 CFR part 600) establishing application and review procedures for, and administration, audit, and closeout of, grants and cooperative agreements.

A7 [Reserved]

A8 Awards of Certain Contracts

Awards of contracts for technical support services, management and operation of a government-owned facility, and personal services.

A9 Information Gathering, Analysis, and Dissemination

Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including, but not limited to, computer modeling), document preparation (including, but not limited to, conceptual design, feasibility studies, and analytical energy supply and demand studies), and information dissemination (including, but not limited to, document publication and distribution, and classroom training and informational programs), but not including site characterization or environmental monitoring. (See also B3.1 of appendix B to this part.)

A10 Reports and Recommendations on Non-DOE Legislation

Reports and recommendations on legislation or rulemaking that are not proposed by DOE.

A11 Technical Advice and Assistance to Organizations

Technical advice and planning assistance to international, national, state, and local organizations.

A12 Emergency Preparedness Planning

Emergency preparedness planning activities, including, but not limited to, the designation of onsite evacuation routes.

A13 Procedural Documents

Administrative, organizational, or procedural Policies, Orders, Notices, Manuals, and Guides.

A14 Approval of Technical Exchange Arrangements

Approval of technical exchange arrangements for information, data, or personnel with other countries or international organizations (including, but not limited to, assistance in identifying and analyzing another country's energy resources, needs and options).

A15 International Agreements for Energy Research and Development

Approval of DOE participation in international “umbrella” agreements for cooperation in energy research and development activities that would not commit the U.S. to any specific projects or activities.

Appendix B to Part 1021 Categorical Exclusions Applicable to Specific Agency Actions

Table of Contents

B. Conditions That Are Integral Elements of the Categories of Actions in Appendix B

B1. Categorical Exclusions Applicable to Facility Operation

B1.1 Changing rates and prices

B1.2 Training exercises and simulations

B1.3 Routine maintenance

B1.4 Air conditioning systems for existing equipment

B1.5 Existing steam plants and cooling water systems

B1.6 Tanks and equipment to control runoff and spills

B1.7 Electronic equipment

B1.8 Screened water intake and outflow structures

B1.9 Airway safety markings and painting

B1.10 Onsite storage of activated material

B1.11 Fencing

B1.12 Detonation or burning of explosives or propellants after testing

B1.13 Pathways, short access roads, and rail lines

B1.14 Refueling of nuclear reactors

B1.15 Support buildings

B1.16 Asbestos removal

B1.17 Polychlorinated biphenyl removal

B1.18 Water supply wells

B1.19 Microwave, meteorological, and radio towers

B1.20 Protection of cultural resources, fish and wildlife habitat

B1.21 Noise abatement

B1.22 Relocation of buildings

B1.23 Demolition and disposal of buildings

B1.24 Property transfers

B1.25 Real property transfers for cultural resources protection, habitat preservation, and wildlife management

B1.26 Small water treatment facilities

B1.27 Disconnection of utilities

B1.28 Placing a facility in an environmentally safe condition

B1.29 Disposal facilities for construction and demolition waste

B1.30 Transfer actions

B1.31 Installation or relocation of machinery and equipment

B1.32 Traffic flow adjustments

B1.33 Stormwater runoff control

B1.34 Lead-based paint containment, removal, and disposal

B1.35 Drop-off, collection, and transfer facilities for recyclable materials

B1.36 Determinations of excess real property

B2. Categorical Exclusions Applicable to Safety and Health

B2.1 Workplace enhancements

B2.2 Building and equipment instrumentation

B2.3 Personnel safety and health equipment

B2.4 Equipment qualification

B2.5 Facility safety and environmental improvements

B2.6 Recovery of radioactive sealed sources

B3. Categorical Exclusions Applicable to Site Characterization, Monitoring, and General Research

B3.1 Site characterization and environmental monitoring

B3.2 Aviation activities

B3.3 Research related to conservation of fish, wildlife, and cultural resources

B3.4 Transport packaging tests for radioactive or hazardous material

B3.5 Tank car tests

B3.6 Small-scale research and development, laboratory operations, and pilot projects

B3.7 New terrestrial infill exploratory and experimental wells

B3.8 Outdoor terrestrial ecological and environmental research

B3.9 Projects to reduce emissions and waste generation

B3.10 Particle accelerators

B3.11 Outdoor tests and experiments on materials and equipment components

B3.12 Microbiological and biomedical facilities

B3.13 Magnetic fusion experiments

B3.14 Small-scale educational facilities

B3.15 Small-scale indoor research and development projects using nanoscale materials

B3.16 Research activities in aquatic environments

B4. Categorical Exclusions Applicable to Electric Power and Transmission

B4.1 Contracts, policies, and marketing and allocation plans for electric power

B4.2 Export of electric energy

B4.3 Electric power marketing rate changes

B4.4 Power marketing services and activities

B4.5 Temporary adjustments to river operations

B4.6 Additions and modifications to transmission facilities

B4.7 Fiber optic cable

B4.8 Electricity transmission agreements

B4.9 Multiple use of powerline rights-of-way

B4.10 Removal of electric transmission facilities

B4.11 Electric power substations and interconnection facilities

B4.12 Construction of powerlines

B4.13 Upgrading and rebuilding existing powerlines

B4.14 Construction and operation of electrochemical-battery or flywheel energy storage systems

B5. Categorical Exclusions Applicable to Conservation, Fossil, and Renewable Energy Activities

B5.1 Actions to conserve energy or water

B5.2 Modifications to pumps and piping

B5.3 Modification or abandonment of wells

B5.4 Repair or replacement of pipelines

B5.5 Short pipeline segments

B5.6 Oil spill cleanup

B5.7 Export of natural gas and associated transportation by marine vessel

B5.8 [Reserved]

B5.9 Temporary exemptions for electric powerplants

B5.10 Certain permanent exemptions for existing electric powerplants

B5.11 Permanent exemptions allowing mixed natural gas and petroleum

B5.12 Workover of existing wells

B5.13 Experimental wells for injection of small quantities of carbon dioxide

B5.14 Combined heat and power or cogeneration systems

B5.15 Small-scale renewable energy research and development and pilot projects

B5.16 Solar photovoltaic systems

B5.17 Solar thermal systems

B5.18 Wind turbines

B5.19 Ground source heat pumps

B5.20 Biomass power plants

B5.21 Methane gas recovery and utilization systems

B5.22 Alternative fuel vehicle fueling stations

B5.23 Electric vehicle charging stations

B5.24 Drop-in hydroelectric systems

B5.25 Small-scale renewable energy research and development and pilot projects in aquatic environments

B6. Categorical Exclusions Applicable to Environmental Restoration and Waste Management Activities

B6.1 Cleanup actions

B6.2 Waste collection, treatment, stabilization, and containment facilities

B6.3 Improvements to environmental control systems

B6.4 Facilities for storing packaged hazardous waste for 90 days or less

B6.5 Facilities for characterizing and sorting packaged waste and overpacking waste

B6.6 Modification of facilities for storing, packaging, and repacking waste

B6.7 [Reserved]

B6.8 Modifications for waste minimization and reuse of materials

B6.9 Measures to reduce migration of contaminated groundwater

B6.10 Upgraded or replacement waste storage facilities

B7. Categorical Exclusions Applicable to International Activities

B7.1 Emergency measures under the International Energy Program

B7.2 Import and export of special nuclear or isotopic materials

B. Conditions That Are Integral Elements of the Categories of Actions in Appendix B

The categories of actions listed below include the following conditions as integral elements of the categories of actions. To fit within the categories of actions listed below, a proposal must be one that would not:

(1) Threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, or similar requirements of DOE or Executive Orders;

(2) Require siting and construction or major expansion of waste storage, disposal, recovery, or treatment facilities (including incinerators), but the proposal may include categorically excluded waste storage, disposal, recovery, or treatment actions or facilities;

(3) Disturb hazardous substances, pollutants, contaminants, or CERCLA-excluded petroleum and natural gas products that preexist in the environment such that there would be uncontrolled or unpermitted releases;

(4) Have the potential to cause significant impacts on environmentally sensitive resources. An environmentally sensitive resource is typically a resource that has been identified as needing protection through Executive Order, statute, or regulation by Federal, state, or local government, or a Federally recognized Indian tribe. An action may be categorically excluded if, although sensitive resources are present, the action would not have the potential to cause significant impacts on those resources (such as construction of a building with its foundation well above a sole-source aquifer or upland surface soil removal on a site that has wetlands). Environmentally sensitive resources include, but are not limited to:

(i) Property (such as sites, buildings, structures, and objects) of historic, archeological, or architectural significance designated by a Federal, state, or local government, Federally recognized Indian tribe, or Native Hawaiian organization, or property determined to be eligible for listing on the National Register of Historic Places;

(ii) Federally-listed threatened or endangered species or their habitat (including critical habitat) or Federally-proposed or candidate species or their habitat (Endangered Species Act); state-listed or state-proposed endangered or threatened species or their habitat; Federally-protected marine mammals and Essential Fish Habitat (Marine Mammal Protection Act; Magnuson-Stevens Fishery Conservation and Management Act); and otherwise Federally-protected species (such as the Bald and Golden Eagle Protection Act or the Migratory Bird Treaty Act);

(iii) Floodplains and wetlands (as defined in 10 CFR 1022.4, “Compliance with Floodplain and Wetland Environmental Review Requirements: Definitions,” or its successor);

(iv) Areas having a special designation such as Federally- and state-designated wilderness areas, national parks, national monuments, national natural landmarks, wild and scenic rivers, state and Federal wildlife refuges, scenic areas (such as National Scenic and Historic Trails or National Scenic Areas), and marine sanctuaries;

(v) Prime or unique farmland, or other farmland of statewide or local importance, as defined at 7 CFR 658.2(a), “Farmland Protection Policy Act: Definitions,” or its successor;

(vi) Special sources of water (such as sole-source aquifers, wellhead protection areas, and other water sources that are vital in a region); and

(vii) Tundra, coral reefs, or rain forests; or

(5) Involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner designed and operated to prevent unauthorized release into the environment and conducted in accordance with applicable requirements, such as those of the Department of Agriculture, the Environmental Protection Agency, and the National Institutes of Health.

B1. Categorical Exclusions Applicable to Facility Operation

B1.1 Changing Rates and Prices

Changing rates for services or prices for products marketed by parts of DOE other than Power Marketing Administrations, and approval of rate or price changes for non-DOE entities, that are consistent with the change in the implicit price deflator for the Gross Domestic Product published by the Department of Commerce, during the period since the last rate or price change.

B1.2 Training Exercises and Simulations

Training exercises and simulations (including, but not limited to, firing-range training, small-scale and short-duration force-on-force exercises, emergency response training, fire fighter and rescue training, and decontamination and spill cleanup training) conducted under appropriately controlled conditions and in accordance with applicable requirements.

B1.3 Routine Maintenance

Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (including, but not limited to, pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed, provided that the activities would be conducted in a manner in accordance with applicable requirements. Custodial services are activities to preserve facility appearance, working conditions, and sanitation (such as cleaning, window washing, lawn mowing, trash collection, painting, and snow removal). Routine maintenance activities, corrective (that is, repair), preventive, and predictive, are required to maintain and preserve buildings, structures, infrastructures, and equipment in a condition suitable for a facility to be used for its designated purpose. Such maintenance may occur as a result of severe weather (such as hurricanes, floods, and tornados), wildfires, and other such events. Routine maintenance may result in replacement to the extent that replacement is in-kind and is not a substantial upgrade or improvement. In-kind replacement includes installation of new components to replace outmoded components, provided that the replacement does not result in a significant change in the expected useful life, design capacity, or function of the facility. Routine maintenance does not include replacement of a major component that significantly extends the originally intended useful life of a facility (for example, it does not include the replacement of a reactor vessel near the end of its useful life). Routine maintenance activities include, but are not limited to:

(a) Repair or replacement of facility equipment, such as lathes, mills, pumps, and presses;

(b) Door and window repair or replacement;

(c) Wall, ceiling, or floor repair or replacement;

(d) Reroofing;

(e) Plumbing, electrical utility, lighting, and telephone service repair or replacement;

(f) Routine replacement of high-efficiency particulate air filters;

(g) Inspection and/or treatment of currently installed utility poles;

(h) Repair of road embankments;

(i) Repair or replacement of fire protection sprinkler systems;

(j) Road and parking area resurfacing, including construction of temporary access to facilitate resurfacing, and scraping and grading of unpaved surfaces;

(k) Erosion control and soil stabilization measures (such as reseeding, gabions, grading, and revegetation);

(l) Surveillance and maintenance of surplus facilities in accordance with DOE Order 435.1, “Radioactive Waste Management,” or its successor;

(m) Repair and maintenance of transmission facilities, such as replacement of conductors of the same nominal voltage, poles, circuit breakers, transformers, capacitors, crossarms, insulators, and downed powerlines, in accordance, where appropriate, with 40 CFR part 761 (Polychlorinated Biphenyls Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions) or its successor;

(n) Routine testing and calibration of facility components, subsystems, or portable equipment (such as control valves, in-core monitoring devices, transformers, capacitors, monitoring wells, lysimeters, weather stations, and flumes);

(o) Routine decontamination of the surfaces of equipment, rooms, hot cells, or other interior surfaces of buildings (by such activities as wiping with rags, using strippable latex, and minor vacuuming), and removal of contaminated intact equipment and other material (not including spent nuclear fuel or special nuclear material in nuclear reactors); and

(p) Removal of debris.

B1.4 Air Conditioning Systems for Existing Equipment

Installation or modification of air conditioning systems required for temperature control for operation of existing equipment.

B1.5 Existing Steam Plants and Cooling Water Systems

Minor improvements to existing steam plants and cooling water systems (including, but not limited to, modifications of existing cooling towers and ponds), provided that the improvements would not: (1) Create new sources of water or involve new receiving waters; (2) have the potential to significantly alter water withdrawal rates; (3) exceed the permitted temperature of discharged water; or (4) increase introductions of, or involve new introductions of, hazardous substances, pollutants, contaminants, or CERCLA-excluded petroleum and natural gas products.

B1.6 Tanks and Equipment To Control Runoff and Spills

Installation or modification of retention tanks or small (normally under one acre) basins and associated piping and pumps for existing operations to control runoff or spills (such as under 40 CFR part 112). Modifications include, but are not limited to, installing liners or covers. (See also B1.33 of this appendix.)

B1.7 Electronic Equipment

Acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices for grid demand and response, communication systems, data processing equipment, and similar electronic equipment.

B1.8 Screened Water Intake and Outflow Structures

Modifications to screened water intake and outflow structures such that intake velocities and volumes and water effluent quality and volumes are consistent with existing permit limits.

B1.9 Airway Safety Markings and Painting

Placement of airway safety markings on, painting of, and repair and in-kind replacement of lighting on powerlines and antenna structures, wind turbines, and similar structures in accordance with applicable requirements (such as Federal Aviation Administration standards).

B1.10 Onsite Storage of Activated Material

Routine, onsite storage at an existing facility of activated equipment and material (including, but not limited to, lead) used at that facility, to allow reuse after decay of radioisotopes with short half-lives.

B1.11 Fencing

Installation of fencing, including, but not limited to border marking, that would not have the potential to significantly impede wildlife population movement (including migration) or surface water flow.

B1.12 Detonation or Burning of Explosives or Propellants After Testing

Outdoor detonation or burning of explosives or propellants that failed (duds), were damaged (such as by fracturing), or were otherwise not consumed in testing. Outdoor detonation or burning would be in areas designated and routinely used for those purposes under existing applicable permits issued by Federal, state, and local authorities (such as a permit for a RCRA miscellaneous unit (40 CFR part 264, subpart X)).

B1.13 Pathways, Short Access Roads, and Rail Lines

Construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement plans, of pedestrian walkways and trails, bicycle paths, small outdoor fitness areas, and short access roads and rail lines (such as branch and spur lines).

B1.14 Refueling of Nuclear Reactors

Refueling of operating nuclear reactors, during which operations may be suspended and then resumed.

B1.15 Support Buildings

Siting, construction or modification, and operation of support buildings and support structures (including, but not limited to, trailers and prefabricated and modular buildings) within or contiguous to an already developed area (where active utilities and currently used roads are readily accessible). Covered support buildings and structures include, but are not limited to, those for office purposes; parking; cafeteria services; education and training; visitor reception; computer and data processing services; health services or recreation activities; routine maintenance activities; storage of supplies and equipment for administrative services and routine maintenance activities; security (such as security posts); fire protection; small-scale fabrication (such as machine shop activities), assembly, and testing of non- nuclear equipment or components; and similar support purposes, but exclude facilities for nuclear weapons activities and waste storage activities, such as activities covered in B1.10, B1.29, B1.35, B2.6, B6.2, B6.4, B6.5, B6.6, and B6.10 of this appendix.

B1.16 Asbestos Removal

Removal of asbestos-containing materials from buildings in accordance with applicable requirements (such as 40 CFR part 61, “National Emission Standards for Hazardous Air Pollutants”; 40 CFR part 763, “Asbestos”; 29 CFR part 1910, subpart I, “Personal Protective Equipment”; and 29 CFR part 1926, “Safety and Health Regulations for Construction”; and appropriate state and local requirements, including certification of removal contractors and technicians).

B1.17 Polychlorinated Biphenyl Removal

Removal of polychlorinated biphenyl (PCB)-containing items (including, but not limited to, transformers and capacitors), PCB-containing oils flushed from transformers, PCB-flushing solutions, and PCB- containing spill materials from buildings or other aboveground locations in accordance with applicable requirements (such as 40 CFR part 761).

B1.18 Water Supply Wells

Siting, construction, and operation of additional water supply wells (or replacement wells) within an existing well field, or modification of an existing water supply well to restore production, provided that there would be no drawdown other than in the immediate vicinity of the pumping well, and the covered actions would not have the potential to cause significant long-term decline of the water table, and would not have the potential to cause significant degradation of the aquifer from the new or replacement well.

B1.19 Microwave, Meteorological, And Radio Towers

Siting, construction, modification, operation, and removal of microwave, radio communication, and meteorological towers and associated facilities, provided that the towers and associated facilities would not be in a governmentally designated scenic area (see B(4)(iv) of this appendix) unless otherwise authorized by the appropriate governmental entity.

B1.20 Protection of Cultural Resources, Fish and Wildlife Habitat

Small-scale activities undertaken to protect cultural resources (such as fencing, labeling, and flagging) or to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders and minor diversion channels), or fisheries. Such activities would be conducted in accordance with an existing natural or cultural resource plan, if any.

B1.21 Noise Abatement

Noise abatement measures (including, but not limited to, construction of noise barriers and installation of noise control materials).

B1.22 Relocation of Buildings

Relocation of buildings (including, but not limited to, trailers and prefabricated buildings) to an already developed area (where active utilities and currently used roads are readily accessible).

B1.23 Demolition and Disposal of Buildings

Demolition and subsequent disposal of buildings, equipment, and support structures (including, but not limited to, smoke stacks and parking lot surfaces), provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment.

B1.24 Property Transfers

Transfer, lease, disposition, or acquisition of interests in personal property (including, but not limited to, equipment and materials) or real property (including, but not limited to, permanent structures and land), provided that under reasonably foreseeable uses (1) there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment and (2) the covered actions would not have the potential to cause a significant change in impacts from before the transfer, lease, disposition, or acquisition of interests.

B1.25 Real Property Transfers for Cultural Resources Protection, Habitat Preservation, and Wildlife Management

Transfer, lease, disposition, or acquisition of interests in land and associated buildings for cultural resources protection, habitat preservation, or fish and wildlife management, provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment.

B1.26 Small Water Treatment Facilities

Siting, construction, expansion, modification, replacement, operation, and decommissioning of small (total capacity less than approximately 250,000 gallons per day) wastewater and surface water treatment facilities whose liquid discharges are externally regulated, and small potable water and sewage treatment facilities.

B1.27 Disconnection of Utilities

Activities that are required for the disconnection of utility services (including, but not limited to, water, steam, telecommunications, and electrical power) after it has been determined that the continued operation of these systems is not needed for safety.

B1.28 Placing a Facility in an Environmentally Safe Condition

Minor activities that are required to place a facility in an environmentally safe condition where there is no proposed use for the facility. These activities would include, but are not limited to, reducing surface contamination, and removing materials, equipment or waste (such as final defueling of a reactor, where there are adequate existing facilities for the treatment, storage, or disposal of the materials, equipment or waste). These activities would not include conditioning, treatment, or processing of spent nuclear fuel, high-level waste, or special nuclear materials.

B1.29 Disposal Facilities for Construction and Demolition Waste

Siting, construction, expansion, modification, operation, and decommissioning of small (less than approximately 10 acres) solid waste disposal facilities for construction and demolition waste, in accordance with applicable requirements (such as 40 CFR part 257, “Criteria for Classification of Solid Waste Disposal Facilities and Practices,” and 40 CFR part 61, “National Emission Standards for Hazardous Air Pollutants”) that would not release substances at a level, or in a form, that could pose a threat to public health or the environment.

B1.30 Transfer Actions

Transfer actions, in which the predominant activity is transportation, provided that (1) the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site and (2) all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Such transfers are not regularly scheduled as part of ongoing routine operations.

B1.31 Installation or Relocation of Machinery and Equipment

Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or have the potential to cause significant changes to the type and magnitude of environmental impacts.

B1.32 Traffic Flow Adjustments

Traffic flow adjustments to existing roads (including, but not limited to, stop sign or traffic light installation, adjusting direction of traffic flow, and adding turning lanes), and road adjustments (including, but not limited to, widening and realignment) that are within an existing right-of-way and consistent with approved land use or transportation improvement plans.

B1.33 Stormwater Runoff Control

Design, construction, and operation of control practices to reduce stormwater runoff and maintain natural hydrology. Activities include, but are not limited to, those that reduce impervious surfaces (such as vegetative practices and use of porous pavements), best management practices (such as silt fences, straw wattles, and fiber rolls), and use of green infrastructure or other low impact development practices (such as cisterns and green roofs).

B1.34 Lead-Based Paint Containment, Removal, and Disposal

Containment, removal, and disposal of lead-based paint in accordance with applicable requirements (such as provisions relating to the certification of removal contractors and technicians at 40 CFR part 745, “Lead-Based Paint Poisoning Prevention In Certain Residential Structures”).

B1.35 Drop-Off, Collection, and Transfer Facilities for Recyclable Materials

Siting, construction, modification, and operation of recycling or compostable material drop-off, collection, and transfer stations on or contiguous to a previously disturbed or developed area and in an area where such a facility would be consistent with existing zoning requirements. The stations would have appropriate facilities and procedures established in accordance with applicable requirements for the handling of recyclable or compostable materials and household hazardous waste (such as paint and pesticides). Except as specified above, the collection of hazardous waste for disposal and the processing of recyclable or compostable materials are not included in this category of actions.

B1.36 Determinations of Excess Real Property

Determinations that real property is excess to the needs of DOE and, in the case of acquired real property, the subsequent reporting of such determinations to the General Services Administration or, in the case of lands withdrawn or otherwise reserved from the public domain, the subsequent filing of a notice of intent to relinquish with the Bureau of Land Management, Department of the Interior. Covered actions would not include disposal of real property.

B2. Categorical Exclusions Applicable to Safety and Health

B2.1 Workplace Enhancements

Modifications within or contiguous to an existing structure, in a previously disturbed or developed area, to enhance workplace habitability (including, but not limited to, installation or improvements to lighting, radiation shielding, or heating/ventilating/air conditioning and its instrumentation, and noise reduction).

B2.2 Building and Equipment Instrumentation

Installation of, or improvements to, building and equipment instrumentation (including, but not limited to, remote control panels, remote monitoring capability, alarm and surveillance systems, control systems to provide automatic shutdown, fire detection and protection systems, water consumption monitors and flow control systems, announcement and emergency warning systems, criticality and radiation monitors and alarms, and safeguards and security equipment).

B2.3 Personnel Safety and Health Equipment

Installation of, or improvements to, equipment for personnel safety and health (including, but not limited to, eye washes, safety showers, radiation monitoring devices, fumehoods, and associated collection and exhaust systems), provided that the covered actions would not have the potential to cause a significant increase in emissions.

B2.4 Equipment Qualification

Activities undertaken to (1) qualify equipment for use or improve systems reliability or (2) augment information on safety-related system components. These activities include, but are not limited to, transportation container qualification testing, crane and lift-gear certification or recertification testing, high efficiency particulate air filter testing and certification, stress tests (such as “burn-in” testing of electrical components and leak testing), and calibration of sensors or diagnostic equipment.

B2.5 Facility Safety and Environmental Improvements

Safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/upgrade of control valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards and/or sustain high wind loading; and replacement of aboveground or belowground tanks and related piping, provided that there is no evidence of leakage, based on testing in accordance with applicable requirements (such as 40 CFR part 265, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities” and 40 CFR part 280, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks”). These actions do not include rebuilding or modifying substantial portions of a facility (such as replacing a reactor vessel).

B2.6 Recovery of Radioactive Sealed Sources

Recovery of radioactive sealed sources and sealed source-containing devices from domestic or foreign locations provided that (1) the recovered items are transported and stored in compliant containers, and (2) the receiving site has sufficient existing storage capacity and all required licenses, permits, and approvals.

B3. Categorical Exclusions Applicable to Site Characterization, Monitoring, and General Research

B3.1 Site Characterization and Environmental Monitoring

Site characterization and environmental monitoring (including, but not limited to, siting, construction, modification, operation, and dismantlement and removal or otherwise proper closure (such as of a well) of characterization and monitoring devices, and siting, construction, and associated operation of a small-scale laboratory building or renovation of a room in an existing building for sample analysis). Such activities would be designed in conformance with applicable requirements and use best management practices to limit the potential effects of any resultant ground disturbance. Covered activities include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. (This category of actions excludes activities in aquatic environments. See B3.16 of this appendix for such activities.) Specific activities include, but are not limited to:

(a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, radar, and temperature gradient), geochemical, and engineering surveys and mapping, and the establishment of survey marks. Seismic techniques would not include large-scale reflection or refraction testing;

(b) Installation and operation of field instruments (such as stream-gauging stations or flow-measuring devices, telemetry systems, geochemical monitoring tools, and geophysical exploration tools);

(c) Drilling of wells for sampling or monitoring of groundwater or the vadose (unsaturated) zone, well logging, and installation of water-level recording devices in wells;

(d) Aquifer and underground reservoir response testing;

(e) Installation and operation of ambient air monitoring equipment;

(f) Sampling and characterization of water, soil, rock, or contaminants (such as drilling using truck- or mobile- scale equipment, and modification, use, and plugging of boreholes);

(g) Sampling and characterization of water effluents, air emissions, or solid waste streams;

(h) Installation and operation of meteorological towers and associated activities (such as assessment of potential wind energy resources);

(i) Sampling of flora or fauna; and

(j) Archeological, historic, and cultural resource identification in compliance with 36 CFR part 800 and 43 CFR part 7.

B3.2 Aviation Activities

Aviation activities for survey, monitoring, or security purposes that comply with Federal Aviation Administration regulations.

B3.3 Research Related to Conservation of Fish, Wildlife, and Cultural Resources

Field and laboratory research, inventory, and information collection activities that are directly related to the conservation of fish and wildlife resources or to the protection of cultural resources, provided that such activities would not have the potential to cause significant impacts on fish and wildlife habitat or populations or to cultural resources.

B3.4 Transport Packaging Tests for Radioactive or Hazardous Material

Drop, puncture, water-immersion, thermal, and fire tests of transport packaging for radioactive or hazardous materials to certify that designs meet the applicable requirements (such as 49 CFR 173.411 and 173.412 and 10 CFR 71.73).

B3.5 Tank Car Tests

Tank car tests under 49 CFR part 179 (including, but not limited to, tests of safety relief devices, pressure regulators, and thermal protection systems).

B3.6 Small-Scale Research and Development, Laboratory Operations, and Pilot Projects

Siting, construction, modification, operation, and decommissioning of facilities for small-scale research and development projects; conventional laboratory operations (such as preparation of chemical standards and sample analysis); and small-scale pilot projects (generally less than 2 years) frequently conducted to verify a concept before demonstration actions, provided that construction or modification would be within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). Not included in this category are demonstration actions, meaning actions that are undertaken at a scale to show whether a technology would be viable on a larger scale and suitable for commercial deployment.

B3.7 New Terrestrial Infill Exploratory and Experimental Wells

Siting, construction, and operation of new terrestrial infill exploratory and experimental (test) wells, for either extraction or injection use, in a locally characterized geological formation in a field that contains existing operating wells, properly abandoned wells, or unminable coal seams containing natural gas, provided that the site characterization has verified a low potential for seismicity, subsidence, and contamination of freshwater aquifers, and the actions are otherwise consistent with applicable best practices and DOE protocols, including those that protect against uncontrolled releases of harmful materials. Such wells may include those for brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, and oil. Uses for carbon sequestration wells include, but are not limited to, the study of saline formations, enhanced oil recovery, and enhanced coalbed methane extraction.

B3.8 Outdoor Terrestrial Ecological and Environmental Research

Outdoor terrestrial ecological and environmental research in a small area (generally less than 5 acres), including, but not limited to, siting, construction, and operation of a small-scale laboratory building or renovation of a room in an existing building for associated analysis. Such activities would be designed in conformance with applicable requirements and use best management practices to limit the potential effects of any resultant ground disturbance.

B3.9 Projects To Reduce Emissions and Waste Generation

Projects to reduce emissions and waste generation at existing fossil or alternative fuel combustion or utilization facilities, provided that these projects would not have the potential to cause a significant increase in the quantity or rate of air emissions. For this category of actions, “fuel” includes, but is not limited to, coal, oil, natural gas, hydrogen, syngas, and biomass; but “fuel” does not include nuclear fuel. Covered actions include, but are not limited to:

(a) Test treatment of the throughput product (solid, liquid, or gas) generated at an existing and fully operational fuel combustion or utilization facility;

(b) Addition or replacement of equipment for reduction or control of sulfur dioxide, oxides of nitrogen, or other regulated substances that requires only minor modification to the existing structures at an existing fuel combustion or utilization facility, for which the existing use remains essentially unchanged;

(c) Addition or replacement of equipment for reduction or control of sulfur dioxide, oxides of nitrogen, or other regulated substances that involves no permanent change in the quantity or quality of fuel burned or used and involves no permanent change in the capacity factor of the fuel combustion or utilization facility; and

(d) Addition or modification of equipment for capture and control of carbon dioxide or other regulated substances, provided that adequate infrastructure is in place to manage such substances.

B3.10 Particle Accelerators

Siting, construction, modification, operation, and decommissioning of particle accelerators, including electron beam accelerators, with primary beam energy less than approximately 100 million electron volts (MeV) and average beam power less than approximately 250 kilowatts (kW), and associated beamlines, storage rings, colliders, and detectors, for research and medical purposes (such as proton therapy), and isotope production, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible), or internal modification of any accelerator facility regardless of energy, that does not increase primary beam energy or current. In cases where the beam energy exceeds 100 MeV, the average beam power must be less than 250 kW, so as not to exceed an average current of 2.5 milliamperes (mA).

B3.11 Outdoor Tests and Experiments on Materials and Equipment Components

Outdoor tests and experiments for the development, quality assurance, or reliability of materials and equipment (including, but not limited to, weapon system components) under controlled conditions. Covered actions include, but are not limited to, burn tests (such as tests of electric cable fire resistance or the combustion characteristics of fuels), impact tests (such as pneumatic ejector tests using earthen embankments or concrete slabs designated and routinely used for that purpose), or drop, puncture, water-immersion, or thermal tests. Covered actions would not involve source, special nuclear, or byproduct materials, except encapsulated sources manufactured to applicable standards that contain source, special nuclear, or byproduct materials may be used for nondestructive actions such as detector/sensor development and testing and first responder field training.

B3.12 Microbiological and Biomedical Facilities

Siting, construction, modification, operation, and decommissioning of microbiological and biomedical diagnostic, treatment and research facilities (excluding Biosafety Level-3 and Biosafety Level-4), in accordance with applicable requirements and best practices (such as Biosafety in Microbiological and Biomedical Laboratories, 5th Edition, Dec. 2009, U.S. Department of Health and Human Services) including, but not limited to, laboratories, treatment areas, offices, and storage areas, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). Operation may include the purchase, installation, and operation of biomedical equipment (such as commercially available cyclotrons that are used to generate radioisotopes and radiopharmaceuticals, and commercially available biomedical imaging and spectroscopy instrumentation).

B3.13 Magnetic Fusion Experiments

Performing magnetic fusion experiments that do not use tritium as fuel, within existing facilities (including, but not limited to, necessary modifications).

B3.14 Small-Scale Educational Facilities

Siting, construction, modification, operation, and decommissioning of small-scale educational facilities (including, but not limited to, conventional teaching laboratories, libraries, classroom facilities, auditoriums, museums, visitor centers, exhibits, and associated offices) within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). Operation may include, but is not limited to, purchase, installation, and operation of equipment (such as audio/visual and laboratory equipment) commensurate with the educational purpose of the facility.

B3.15 Small-Scale Indoor Research and Development Projects Using Nanoscale Materials

Siting, construction, modification, operation, and decommissioning of facilities for indoor small-scale research and development projects and small-scale pilot projects using nanoscale materials in accordance with applicable requirements (such as engineering, worker safety, procedural, and administrative regulations) necessary to ensure the containment of any hazardous materials. Construction and modification activities would be within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible).

B3.16 Research Activities in Aquatic Environments

Small-scale, temporary surveying, site characterization, and research activities in aquatic environments, limited to:

(a) Acquisition of rights-of-way, easements, and temporary use permits;

(b) Installation, operation, and removal of passive scientific measurement devices, including, but not limited to, antennae, tide gauges, flow testing equipment for existing wells, weighted hydrophones, salinity measurement devices, and water quality measurement devices;

(c) Natural resource inventories, data and sample collection, environmental monitoring, and basic and applied research, excluding

(1) large-scale vibratory coring techniques and

(2) seismic activities other than passive techniques; and

(d) Surveying and mapping.

These activities would be conducted in accordance with, where applicable, an approved spill prevention, control, and response plan and would incorporate appropriate control technologies and best management practices. None of the activities listed above would occur within the boundary of an established marine sanctuary or wildlife refuge, a governmentally proposed marine sanctuary or wildlife refuge, or a governmentally recognized area of high biological sensitivity, unless authorized by the agency responsible for such refuge, sanctuary, or area (or after consultation with the responsible agency, if no authorization is required). If the proposed activities would occur outside such refuge, sanctuary, or area and if the activities would have the potential to cause impacts within such refuge, sanctuary, or area, then the responsible agency shall be consulted in order to determine whether authorization is required and whether such activities would have the potential to cause significant impacts on such refuge, sanctuary, or area. Areas of high biological sensitivity include, but are not limited to, areas of known ecological importance, whale and marine mammal mating and calving/pupping areas, and fish and invertebrate spawning and nursery areas recognized as being limited or unique and vulnerable to perturbation; these areas can occur in bays, estuaries, near shore, and far offshore, and may vary seasonally. No permanent facilities or devices would be constructed or installed. Covered actions do not include drilling of resource exploration or extraction wells.

B4. Categorical Exclusions Applicable to Electrical Power and Transmission

B4.1 Contracts, Policies, and Marketing and Allocation Plans for Electric Power

Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve only the use of the existing transmission system and existing generation resources operating within their normal operating limits.

B4.2 Export of Electric Energy

Export of electric energy as provided by Section 202(e) of the Federal Power Act over existing transmission systems or using transmission system changes that are themselves categorically excluded.

B4.3 Electric Power Marketing Rate Changes

Rate changes for electric power, power transmission, and other products or services provided by a Power Marketing Administration that are based on a change in revenue requirements if the operations of generation projects would remain within normal operating limits.

B4.4 Power Marketing Services and Activities

Power marketing services and power management activities (including, but not limited to, storage, load shaping and balancing, seasonal exchanges, and other similar activities), provided that the operations of generating projects would remain within normal operating limits. (See B4.14 of this appendix for energy storage systems.)

B4.5 Temporary Adjustments to River Operations

Temporary adjustments to river operations to accommodate day-to-day river fluctuations, power demand changes, fish and wildlife conservation program requirements, and other external events, provided that the adjustments would occur within the existing operating constraints of the particular hydrosystem operation.

B4.6 Additions and Modifications to Transmission Facilities

Additions or modifications to electric power transmission facilities within a previously disturbed or developed facility area. Covered activities include, but are not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, load shaping projects (such as reducing energy use during periods of peak demand), changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. (See B4.14 of this appendix for energy storage systems.)

B4.7 Fiber Optic Cable

Adding fiber optic cables to transmission facilities or burying fiber optic cable in existing powerline or pipeline rights-of-way. Covered actions may include associated vaults and pulling and tensioning sites outside of rights-of- way in nearby previously disturbed or developed areas.

B4.8 Electricity Transmission Agreements

New electricity transmission agreements, and modifications to existing transmission arrangements, to use a transmission facility of one system to transfer power of and for another system, provided that no new generation projects would be involved and no physical changes in the transmission system would be made beyond the previously disturbed or developed facility area.

B4.9 Multiple Use of Powerline Rights-of-Way

Granting or denying requests for multiple uses of a transmission facility's rights-of-way (including, but not limited to, grazing permits and crossing agreements for electric lines, water lines, natural gas pipelines, communications cables, roads, and drainage culverts).

B4.10 Removal of Electric Transmission Facilities

Deactivation, dismantling, and removal of electric transmission facilities (including, but not limited to, electric powerlines, substations, and switching stations) and abandonment and restoration of rights-of-way (including, but not limited to, associated access roads).

B4.11 Electric Power Substations and Interconnection Facilities

Construction or modification of electric power substations or interconnection facilities (including, but not limited to, switching stations and support facilities).

B4.12 Construction of Powerlines

Construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way.

B4.13 Upgrading and Rebuilding Existing Powerlines

Upgrading or rebuilding existing electric powerlines, which may involve relocations of small segments of the powerlines within an existing powerline right-of-way or within otherwise previously disturbed or developed lands (as discussed at 10 CFR 1021.102(g)(1)). Upgrading or rebuilding existing electric powerlines also may involve widening an existing powerline right-of-way to meet current electrical standards if the widening remains within previously disturbed or developed lands and only extends into a small area beyond such lands as needed to comply with applicable electrical standards. Covered actions would be in accordance with applicable requirements, including the integral elements listed at the start of appendix B of this part; and would incorporate appropriate design and construction standards, control technologies, and best management practices. This categorical exclusion does not apply to underwater powerlines. As used in this categorical exclusion, “small” has the meaning discussed at 10 CFR 1021.102(g)(2).

B4.14 Construction and Operation of Electrochemical-Battery or Flywheel Energy Storage Systems

Construction, operation, upgrade, or decommissioning of an electrochemical-battery or flywheel energy storage system within a previously disturbed or developed area or within a small (as discussed at 10 CFR 1021.102(g)(2)) area contiguous to a previously disturbed or developed area. Covered actions would be in accordance with applicable requirements (such as land use and zoning requirements) in the proposed project area and the integral elements listed at the start of appendix B of this part, and would incorporate appropriate safety standards (including the current National Fire Protection Association 855, Standard for the Installation of Stationary Energy Storage Systems), design and construction standards, control technologies, and best management practices.

B5. Categorical Exclusions Applicable to Conservation, Fossil, and Renewable Energy Activities

B5.1 Actions To Conserve Energy or Water

(a) Actions to conserve energy or water, demonstrate potential energy or water conservation, and promote energy efficiency that would not have the potential to cause significant changes in the indoor or outdoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, manufacturers, and designers), organizations (such as utilities), and governments (such as state, local, and tribal). Covered actions include, but are not limited to weatherization (such as insulation and replacing windows and doors); programmed lowering of thermostat settings; placement of timers on hot water heaters; installation or replacement of energy efficient lighting, low-flow plumbing fixtures (such as faucets, toilets, and showerheads), heating, ventilation, and air conditioning systems, and appliances; installation of drip- irrigation systems; improvements in generator efficiency and appliance efficiency ratings; efficiency improvements for vehicles and transportation (such as fleet changeout); transportation management systems (such as traffic signal control systems, car navigation, speed cameras, and automatic plate number recognition); development of energy-efficient manufacturing, industrial, or building practices; and small-scale energy efficiency and conservation research and development and small-scale pilot projects. Covered actions include building renovations or new structures, provided that they occur in a previously disturbed or developed area. Covered actions could involve commercial, residential, agricultural, academic, institutional, or industrial sectors. Covered actions do not include rulemakings, standard- settings, or proposed DOE legislation, except for those actions listed in B5.1(b) of this appendix.

(b) Covered actions include rulemakings that establish energy conservation standards for consumer products and industrial equipment, provided that the actions would not:

(1) Have the potential to cause a significant change in manufacturing infrastructure (such as construction of new manufacturing plants with considerable associated ground disturbance);

(2) involve significant unresolved conflicts concerning alternative uses of available resources (such as rare or limited raw materials);

(3) have the potential to result in a significant increase in the disposal of materials posing significant risks to human health and the environment (such as RCRA hazardous wastes); or

(4) have the potential to cause a significant increase in energy consumption in a state or region.

B5.2 Modifications to Pumps and Piping

Modifications to existing pump and piping configurations (including, but not limited to, manifolds, metering systems, and other instrumentation on such configurations conveying materials such as air, brine, carbon dioxide, geothermal system fluids, hydrogen gas, natural gas, nitrogen gas, oil, produced water, steam, and water). Covered modifications would not have the potential to cause significant changes to design process flow rates or permitted air emissions.

B5.3 Modification or Abandonment of Wells

Modification (but not expansion) or plugging and abandonment of wells, provided that site characterization has verified a low potential for seismicity, subsidence, and contamination of freshwater aquifers, and the actions are otherwise consistent with best practices and DOE protocols, including those that protect against uncontrolled releases of harmful materials. Such wells may include, but are not limited to, storage and injection wells for brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, and oil. Covered modifications would not be part of site closure.

B5.4 Repair or Replacement of Pipelines

Repair, replacement, upgrading, rebuilding, or minor relocation of pipelines within existing rights-of- way, provided that the actions are in accordance with applicable requirements (such as Army Corps of Engineers permits under section 404 of the Clean Water Act). Pipelines may convey materials including, but not limited to, air, brine, carbon dioxide, geothermal system fluids, hydrogen gas, natural gas, nitrogen gas, oil, produced water, steam, and water.

B5.5 Short Pipeline Segments

Construction and subsequent operation of short (generally less than 20 miles in length) pipeline segments conveying materials (such as air, brine, carbon dioxide, geothermal system fluids, hydrogen gas, natural gas, nitrogen gas, oil, produced water, steam, and water) between existing source facilities and existing receiving facilities (such as facilities for use, reuse, transportation, storage, and refining), provided that the pipeline segments are within previously disturbed or developed rights-of-way.

B5.6 Oil Spill Cleanup

Removal of oil and contaminated materials recovered in oil spill cleanup operations and disposal of these materials in accordance with applicable requirements (such as the National Oil and Hazardous Substances Pollution Contingency Plan).

B5.7 Export of Natural Gas and Associated Transportation by Marine Vessel

Approvals or disapprovals of new authorizations or amendments of existing authorizations to export natural gas under section 3 of the Natural Gas Act and any associated transportation of natural gas by marine vessel.

B5.8 [Reserved]

B5.9 Temporary Exemptions for Electric Powerplants

Grants or denials of temporary exemptions under the Powerplant and Industrial Fuel Use Act of 1978, as amended, for electric powerplants.

B5.10 Certain Permanent Exemptions for Existing Electric Powerplants

For existing electric powerplants, grants or denials of permanent exemptions under the Powerplant and Industrial Fuel Use Act of 1978, as amended, other than exemptions under section 312(c) relating to cogeneration and section 312(b) relating to certain state or local requirements.

B5.11 Permanent Exemptions Allowing Mixed Natural Gas and Petroleum

For new electric powerplants, grants or denials of permanent exemptions from the prohibitions of Title II of the Powerplant and Industrial Fuel Use Act of 1978, as amended, to permit the use of certain fuel mixtures containing natural gas or petroleum.

B5.12 Workover of Existing Wells

Workover (operations to restore production, such as deepening, plugging back, pulling and resetting lines, and squeeze cementing) of existing wells (including, but not limited to, activities associated with brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, and oil) to restore functionality, provided that workover operations are restricted to the existing wellpad and do not involve any new site preparation or earthwork that would have the potential to cause significant impacts on nearby habitat; that site characterization has verified a low potential for seismicity, subsidence, and contamination of freshwater aquifers; and the actions are otherwise consistent with best practices and DOE protocols, including those that protect against uncontrolled releases of harmful materials.

B5.13 Experimental Wells for Injection of Small Quantities of Carbon Dioxide

Siting, construction, operation, plugging, and abandonment of experimental wells for the injection of small quantities of carbon dioxide (and other incidentally co-captured gases) in locally characterized, geologically secure storage formations at or near existing carbon dioxide sources to determine the suitability of the formations for large-scale sequestration, provided that (1) The characterization has verified a low potential for seismicity, subsidence, and contamination of freshwater aquifers; (2) the wells are otherwise in accordance with applicable requirements, best practices, and DOE protocols, including those that protect against uncontrolled releases of harmful materials; and (3) the wells and associated drilling activities are sufficiently remote so that they would not have the potential to cause significant impacts related to noise and other vibrations. Wells may be used for enhanced oil or natural gas recovery or for secure storage of carbon dioxide in saline formations or other secure formations. Over the duration of a project, the wells would be used to inject, in aggregate, less than 500,000 tons of carbon dioxide into the geologic formation. Covered actions exclude activities in aquatic environments. (See B3.16 of this appendix for activities in aquatic environments.)

B5.14 Combined Heat and Power or Cogeneration Systems

Conversion to, replacement of, or modification of combined heat and power or cogeneration systems (the sequential or simultaneous production of multiple forms of energy, such as thermal and electrical energy, in a single integrated system) at existing facilities, provided that the conversion, replacement, or modification would not have the potential to cause a significant increase in the quantity or rate of air emissions and would not have the potential to cause significant impacts to water resources.

B5.15 Small-Scale Renewable Energy Research and Development and Pilot Projects

Small-scale renewable energy research and development projects and small-scale pilot projects, provided that the projects are located within a previously disturbed or developed area. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.16 Solar Photovoltaic Systems

(a) The installation, modification, operation, or decommissioning of commercially available solar photovoltaic systems:

(1) Located on a building or other structure (such as rooftop, parking lot or facility, or mounted to signage, lighting, gates, or fences); or

(2) Located within a previously disturbed or developed area.

(b) Covered actions would be in accordance with applicable requirements (such as land use and zoning requirements) in the proposed project area and the integral elements listed at the start of appendix B of this part, and would be consistent with applicable plans for the management of wildlife and habitat, including plans to maintain habitat connectivity, and incorporate appropriate control technologies and best management practices.

B5.17 Solar Thermal Systems

The installation, modification, operation, and removal of commercially available small-scale solar thermal systems (including, but not limited to, solar hot water systems) located on or contiguous to a building, and if located on land, generally comprising less than 10 acres within a previously disturbed or developed area. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.18 Wind Turbines

The installation, modification, operation, and removal of a small number (generally not more than 2) of commercially available wind turbines, with a total height generally less than 200 feet (measured from the ground to the maximum height of blade rotation) that (1) Are located within a previously disturbed or developed area; (2) are located more than 10 nautical miles (about 11.5 miles) from an airport or aviation navigation aid; (3) are located more than 1.5 nautical miles (about 1.7 miles) from National Weather Service or Federal Aviation Administration Doppler weather radar; (4) would not have the potential to cause significant impacts on bird or bat populations; and (5) are sited or designed such that the project would not have the potential to cause significant impacts to persons (such as from shadow flicker and other visual effects, and noise). Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices. Covered actions include only those related to wind turbines to be installed on land.

B5.19 Ground Source Heat Pumps

The installation, modification, operation, and removal of commercially available small-scale ground source heat pumps to support operations in single facilities (such as a school or community center) or contiguous facilities (such as an office complex) (1) Only where (a) major associated activities (such as drilling and discharge) are regulated, and (b) appropriate leakage and contaminant control measures would be in place (including for cross- contamination between aquifers); (2) that would not have the potential to cause significant changes in subsurface temperature; and (3) would be located within a previously disturbed or developed area. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.20 Biomass Power Plants

The installation, modification, operation, and removal of small-scale biomass power plants (generally less than 10 megawatts), using commercially available technology (1) Intended primarily to support operations in single facilities (such as a school and community center) or contiguous facilities (such as an office complex); (2) that would not affect the air quality attainment status of the area and would not have the potential to cause a significant increase in the quantity or rate of air emissions and would not have the potential to cause significant impacts to water resources; and (3) would be located within a previously disturbed or developed area. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.21 Methane Gas Recovery and Utilization Systems

The installation, modification, operation, and removal of commercially available methane gas recovery and utilization systems installed within a previously disturbed or developed area on or contiguous to an existing landfill or wastewater treatment plant that would not have the potential to cause a significant increase in the quantity or rate of air emissions. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.22 Alternative Fuel Vehicle Fueling Stations

The installation, modification, operation, and removal of alternative fuel vehicle fueling stations (such as for compressed natural gas, hydrogen, ethanol and other commercially available biofuels) on the site of a current or former fueling station, or within a previously disturbed or developed area within the boundaries of a facility managed by the owners of a vehicle fleet. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.23 Electric Vehicle Charging Stations

The installation, modification, operation, and removal of electric vehicle charging stations, using commercially available technology, within a previously disturbed or developed area. Covered actions are limited to areas where access and parking are in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.24 Drop-In Hydroelectric Systems

The installation, modification, operation, and removal of commercially available small-scale, drop-in, run-of-the-river hydroelectric systems that would (1) Involve no water storage or water diversion from the stream or river channel where the system is installed and (2) not have the potential to cause significant impacts on water quality, temperature, flow, or volume. Covered systems would be located up-gradient of an existing anadromous fish barrier that is not planned for removal and where fish passage retrofit is not planned and where there would not be the potential for significant impacts to threatened or endangered species or other species of concern (as identified in B(4)(ii) of this appendix). Covered actions would involve no major construction or modification of stream or river channels, and the hydroelectric systems would be placed and secured in the channel without the use of heavy equipment. Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices.

B5.25 Small-Scale Renewable Energy Research and Development and Pilot Projects in Aquatic Environments

Small-scale renewable energy research and development projects and small-scale pilot projects located in aquatic environments. Activities would be in accordance with, where applicable, an approved spill prevention, control, and response plan, and would incorporate appropriate control technologies and best management practices. Covered actions would not occur (1) Within areas of hazardous natural bottom conditions or (2) within the boundary of an established marine sanctuary or wildlife refuge, a governmentally proposed marine sanctuary or wildlife refuge, or a governmentally recognized area of high biological sensitivity, unless authorized by the agency responsible for such refuge, sanctuary, or area (or after consultation with the responsible agency, if no authorization is required). If the proposed activities would occur outside such refuge, sanctuary, or area and if the activities would have the potential to cause impacts within such refuge, sanctuary, or area, then the responsible agency shall be consulted in order to determine whether authorization is required and whether such activities would have the potential to cause significant impacts on such refuge, sanctuary, or area. Areas of high biological sensitivity include, but are not limited to, areas of known ecological importance, whale and marine mammal mating and calving/pupping areas, and fish and invertebrate spawning and nursery areas recognized as being limited or unique and vulnerable to perturbation; these areas can occur in bays, estuaries, near shore, and far offshore, and may vary seasonally. No permanent facilities or devices would be constructed or installed. Covered actions do not include drilling of resource exploration or extraction wells, use of large-scale vibratory coring techniques, or seismic activities other than passive techniques.

B6. Categorical Exclusions Applicable to Environmental Restoration and Waste Management Activities

B6.1 Cleanup Actions

Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other authorities, less than approximately 10 million dollars in cost (in 2011 dollars), to reduce risk to human health or the environment from the release or threat of release of a hazardous substance other than high-level radioactive waste and spent nuclear fuel, including treatment (such as incineration, encapsulation, physical or chemical separation, and compaction), recovery, storage, or disposal of wastes at existing facilities currently handling the type of waste involved in the action. These actions include, but are not limited to:

(a) Excavation or consolidation of contaminated soils or materials from drainage channels, retention basins, ponds, and spill areas that are not receiving contaminated surface water or wastewater, if surface water or groundwater would not collect and if such actions would reduce the spread of, or direct contact with, the contamination;

(b) Removal of bulk containers (such as drums and barrels) that contain or may contain hazardous substances, pollutants, contaminants, CERCLA-excluded petroleum or natural gas products, or hazardous wastes (designated in 40 CFR part 261 or applicable state requirements), if such actions would reduce the likelihood of spillage, leakage, fire, explosion, or exposure to humans, animals, or the food chain;

(c) Removal of an underground storage tank including its associated piping and underlying containment systems in accordance with applicable requirements (such as RCRA, subtitle I; 40 CFR part 265, subpart J; and 40 CFR part 280, subparts F and G) if such action would reduce the likelihood of spillage, leakage, or the spread of, or direct contact with, contamination;

(d) Repair or replacement of leaking containers;

(e) Capping or other containment of contaminated soils or sludges if the capping or containment would not unduly limit future groundwater remediation and if needed to reduce migration of hazardous substances, pollutants, contaminants, or CERCLA-excluded petroleum and natural gas products into soil, groundwater, surface water, or air;

(f) Drainage or closing of man-made surface impoundments if needed to maintain the integrity of the structures;

(g) Confinement or perimeter protection using dikes, trenches, ditches, or diversions, or installing underground barriers, if needed to reduce the spread of, or direct contact with, the contamination;

(h) Stabilization, but not expansion, of berms, dikes, impoundments, or caps if needed to maintain integrity of the structures;

(i) Drainage controls (such as run-off or run-on diversion) if needed to reduce offsite migration of hazardous substances, pollutants, contaminants, or CERCLA-excluded petroleum or natural gas products or to prevent precipitation or run-off from other sources from entering the release area from other areas;

(j) Segregation of wastes that may react with one another or form a mixture that could result in adverse environmental impacts;

(k) Use of chemicals and other materials to neutralize the pH of wastes;

(l) Use of chemicals and other materials to retard the spread of the release or to mitigate its effects if the use of such chemicals would reduce the spread of, or direct contact with, the contamination;

(m) Installation and operation of gas ventilation systems in soil to remove methane or petroleum vapors without any toxic or radioactive co-contaminants if appropriate filtration or gas treatment is in place;

(n) Installation of fences, warning signs, or other security or site control precautions if humans or animals have access to the release; and

(o) Provision of an alternative water supply that would not create new water sources if necessary immediately to reduce exposure to contaminated household or industrial use water and continuing until such time as local authorities can satisfy the need for a permanent remedy.

B6.2 Waste Collection, Treatment, Stabilization, and Containment Facilities

The siting, construction, and operation of temporary (generally less than 2 years) pilot-scale waste collection and treatment facilities, and pilot-scale (generally less than 1 acre) waste stabilization and containment facilities (including siting, construction, and operation of a small-scale laboratory building or renovation of a room in an existing building for sample analysis), provided that the action (1) Supports remedial investigations/feasibility studies under CERCLA, or similar studies under RCRA (such as RCRA facility investigations/corrective measure studies) or other authorities and (2) would not unduly limit the choice of reasonable remedial alternatives (such as by permanently altering substantial site area or by committing large amounts of funds relative to the scope of the remedial alternatives).

B6.3 Improvements to Environmental Control Systems

Improvements to environmental monitoring and control systems of an existing building or structure (such as changes to scrubbers in air quality control systems or ion-exchange devices and other filtration processes in water treatment systems), provided that during subsequent operations (1) Any substance collected by the environmental control systems would be recycled, released, or disposed of within existing permitted facilities and (2) there are applicable statutory or regulatory requirements or permit conditions for disposal, release, or recycling of any hazardous substance or CERCLA-excluded petroleum or natural gas products that are collected or released in increased quantity or that were not previously collected or released.

B6.4 Facilities for Storing Packaged Hazardous Waste for 90 Days or Less

Siting, construction, modification, expansion, operation, and decommissioning of an onsite facility for storing packaged hazardous waste (as designated in 40 CFR part 261) for 90 days or less or for longer periods as provided in 40 CFR 262.34(d), (e), or (f) (such as accumulation or satellite areas).

B6.5 Facilities for Characterizing and Sorting Packaged Waste and Overpacking Waste

Siting, construction, modification, expansion, operation, and decommissioning of an onsite facility for characterizing and sorting previously packaged waste or for overpacking waste, other than high-level radioactive waste, provided that operations do not involve unpacking waste. These actions do not include waste storage (covered under B6.4, B6.6, B6.10 of this appendix) or the handling of spent nuclear fuel.

B6.6 Modification of Facilities for Storing, Packaging, and Repacking Waste

Modification (excluding increases in capacity) of an existing structure used for storing, packaging, or repacking waste other than high-level radioactive waste or spent nuclear fuel, to handle the same class of waste as currently handled at that structure.

B6.7 [Reserved]

B6.8 Modifications for Waste Minimization and Reuse of Materials

Minor operational changes at an existing facility to minimize waste generation and for reuse of materials. These changes include, but are not limited to, adding filtration and recycle piping to allow reuse of machining oil, setting up a sorting area to improve process efficiency, and segregating two waste streams previously mingled and assigning new identification codes to the two resulting wastes.

B6.9 Measures To Reduce Migration of Contaminated Groundwater

Small-scale temporary measures to reduce migration of contaminated groundwater, including the siting, construction, operation, and decommissioning of necessary facilities. These measures include, but are not limited to, pumping, treating, storing, and reinjecting water, by mobile units or facilities that are built and then removed at the end of the action.

B6.10 Upgraded or Replacement Waste Storage Facilities

Siting, construction, modification, expansion, operation, and decommissioning of a small upgraded or replacement facility (less than approximately 50,000 square feet in area) within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible) for storage of waste that is already at the site at the time the storage capacity is to be provided. These actions do not include the storage of high-level radioactive waste, spent nuclear fuel or any waste that requires special precautions to prevent nuclear criticality. (See also B6.4, B6.5, B6.6 of this appendix.)

B7. Categorical Exclusions Applicable to International Activities

B7.1 Emergency Measures Under the International Energy Program

Planning and implementation of emergency measures pursuant to the International Energy Program.

B7.2 Import and Export of Special Nuclear or Isotopic Materials

Approval of import or export of small quantities of special nuclear materials or isotopic materials in accordance with applicable requirements (such as the Nuclear Non-Proliferation Act of 1978 and the “Procedures Established Pursuant to the Nuclear Non-Proliferation Act of 1978” (43 FR 25326, June 9, 1978)).