Title 30—Mineral Resources--Volume 3

L [RESERVED] SUBCHAPTER L [RESERVED]

SUBCHAPTER M UNIFORM MINE HEALTH REGULATIONS

PART 60 RESPIRABLE CRYSTALLINE SILICA

Authority: 30 U.S.C. 811, 813(h) and 957.

Source: 89 FR 28470, Apr. 18, 2024, unless otherwise noted.

§ 60.1 Scope; compliance dates.

(a) This part sets forth mandatory health standards for each surface and underground metal, nonmetal, and coal mine subject to the Federal Mine Safety and Health Act of 1977, as amended. Requirements regarding medical surveillance for metal and nonmetal mines are also included.

(b) The compliance dates for the provisions of this part are as follows:

(1) For coal mine operators, April 14, 2025.

(2) For metal and nonmetal mine operators, April 8, 2026.

§ 60.2 Definitions.

The following definitions apply in this part:

Action level means an airborne concentration of respirable crystalline silica of 25 micrograms per cubic meter of air (µg/m 3) for a full-shift exposure, calculated as an 8-hour time-weighted average (TWA).

Respirable crystalline silica means quartz, cristobalite, and/or tridymite contained in airborne particles that are determined to be respirable by a sampling device designed to meet the characteristics for respirable-particle-size-selective samplers that conform to the International Organization for Standardization (ISO) 7708:1995: Air Quality—Particle Size Fraction Definitions for Health-Related Sampling.

Specialist means an American Board-Certified Specialist in Pulmonary Disease or an American Board-Certified Specialist in Occupational Medicine.

§ 60.10 Permissible exposure limit (PEL).

The mine operator shall ensure that no miner is exposed to an airborne concentration of respirable crystalline silica in excess of 50 µg/m 3 for a full-shift exposure, calculated as an 8-hour TWA.

§ 60.11 Methods of compliance.

(a) The mine operator shall install, use, and maintain feasible engineering controls, supplemented by administrative controls when necessary, to keep each miner's exposure at or below the PEL, except as specified in § 60.14.

(b) Rotation of miners shall not be considered an acceptable administrative control used for compliance with this part.

§ 60.12 Exposure monitoring.

(a) Sampling. (1) Mine operators shall commence sampling by the compliance date in § 60.1 to assess the full shift, 8-hour TWA exposure of respirable crystalline silica for each miner who is or may reasonably be expected to be exposed to respirable crystalline silica.

(2) If the sampling under paragraph (a)(1) of this section is:

(i) Below the action level, the mine operator shall take at least one additional sampling within 3 months.

(ii) At or above the action level but at or below the PEL, the mine operator shall take another sampling within 3 months.

(iii) Above the PEL, the mine operator shall take corrective actions and sample pursuant to § 60.12(b).

(3) Where the most recent sampling indicates that miner exposures are at or above the action level but at or below the PEL, the mine operator shall continue to sample within 3 months of the previous sampling.

(4) The mine operator may discontinue sampling when two consecutive samplings indicate that miner exposures are below the action level. The second of these samplings must be taken after the operator receives the results of the prior sampling but no sooner than 7 days after the prior sampling was conducted.

(b) Corrective actions sampling. Where the most recent sampling indicates that miner exposures are above the PEL, the mine operator shall sample after corrective actions are taken pursuant to § 60.13 until the sampling indicates that miner exposures are at or below the PEL. The mine operator shall immediately report all operator samples above the PEL to the MSHA District Manager or to any other MSHA office designated by the District Manager.

(c) Periodic evaluation. At least every 6 months after commencing sampling under 60.12(a)(1) or whenever there is a change in: production; processes; installation or maintenance of engineering controls; installation or maintenance of equipment; administrative controls; or geological conditions; mine operators shall evaluate whether the change may reasonably be expected to result in new or increased respirable crystalline silica exposures. Once the evaluation is completed, the mine operator shall:

(1) Make a record of the evaluation, including the evaluated change, the impact on respirable crystalline silica exposure, and the date of the evaluation; and

(2) Post the record on the mine bulletin board and, if applicable, by electronic means, for the next 31 days.

(d) Post-evaluation sampling. If the mine operator determines as a result of the periodic evaluation under paragraph (c) of this section that miners may be exposed to respirable crystalline silica at or above the action level, the mine operator shall perform sampling to assess the full shift, 8-hour TWA exposure of respirable crystalline silica for each miner who is or may reasonably be expected to be at or above the action level.

(e) Sampling requirements. (1) Sampling shall be performed for the duration of a miner's regular full shift and during typical mining activities, including shaft and slope sinking, construction, and removal of overburden.

(2) The full-shift, 8-hour TWA exposure for such miners shall be measured based on:

(i) Personal breathing-zone air samples for metal and nonmetal operations; or

(ii) Occupational environmental samples collected in accordance with § 70.201(c), § 71.201(b), or § 90.201(b) of this chapter for coal operations.

(3) Where several miners perform the same tasks on the same shift and in the same work area, the mine operator may sample a representative fraction (at least two) of these miners to meet the requirements in paragraphs (a) through (e) of this section. In sampling a representative fraction of miners, the mine operator shall select the miners who are expected to have the highest exposure to respirable crystalline silica.

(4) The mine operator shall use respirable-particle-size-selective samplers that conform to ISO 7708:1995(E) to determine compliance with the PEL. ISO 7708:1995(E), Air quality—Particle size fraction definitions for health-related sampling, First Edition, 1995-04-01, is incorporated by reference into this section with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. This incorporation by reference (IBR) material is available for inspection at the Mine Safety and Health Administration (MSHA) and at the National Archives and Records Administration (NARA). Contact MSHA at: MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; (202) 693-9440; or any Mine Safety and Health Enforcement District Office. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email fr.inspection@nara.gov. The material may be obtained from the International Organization for Standardization (ISO), CP 56, CH-1211 Geneva 20, Switzerland; phone: + 41 22 749 01 11; fax: + 41 22 733 34 30; website: www.iso.org.

(f) Methods of sample analysis. (1) The mine operator shall use a laboratory that is accredited to ISO/IEC 17025 “General requirements for the competence of testing and calibration laboratories” with respect to respirable crystalline silica analyses, where the accreditation has been issued by a body that is compliant with ISO/IEC 17011 “Conformity assessment—Requirements for accreditation bodies accrediting conformity assessment bodies.”

(2) The mine operator shall ensure that the laboratory evaluates all samples using respirable crystalline silica analytical methods specified by MSHA, the National Institute for Occupational Safety and Health (NIOSH), or the Occupational Safety and Health Administration (OSHA).

(g) Sampling records. For each sample taken pursuant to paragraphs (a) through (e) of this section, the mine operator shall make a record of the sample date, the occupations sampled, and the concentrations of respirable crystalline silica and respirable dust and post the record and the laboratory report on the mine bulletin board and, if applicable, by electronic means, for the next 31 days, upon receipt.

[89 FR 28470, Apr. 18, 2024, as amended at 91 FR 9448, Feb. 26, 2026]

§ 60.13 Corrective actions.

(a) If any sampling indicates that a miner's exposure exceeds the PEL, the mine operator shall:

(1) Make approved respirators available to affected miners before the start of the next work shift in accordance with § 60.14(b) and (c);

(2) Ensure that affected miners wear respirators properly for the full shift or during the period of overexposure until miner exposures are at or below the PEL; and

(3) Immediately take corrective actions to lower the concentration of respirable crystalline silica to at or below the PEL.

(b) Once corrective actions have been taken, the mine operator shall:

(1) Conduct sampling pursuant to § 60.12(b); and

(2) Take additional or new corrective actions until sampling indicates miner exposures are at or below the PEL.

(c) The mine operator shall make a record of corrective actions and the dates of the corrective actions under paragraph (a) of this section.

§ 60.14 Respiratory protection.

(a) Temporary use of respirators at metal and nonmetal mines. The metal and nonmetal mine operator shall use respiratory protection as a temporary measure in accordance with paragraph (c) of this section when miners must work in concentrations of respirable crystalline silica above the PEL while:

(1) Engineering control measures are being developed and implemented; or

(2) It is necessary by the nature of work involved (for example, occasional entry into hazardous atmospheres to perform maintenance or investigation).

(b) Miners unable to wear respirators at all mines. Upon written determination by a physician or other licensed health care professional (PLHCP) that an affected miner is unable to wear a respirator, the miner shall be temporarily transferred either to work in a separate area of the same mine or to an occupation at the same mine where respiratory protection is not required.

(1) The affected miner shall continue to receive compensation at no less than the regular rate of pay in the occupation held by that miner immediately prior to the transfer.

(2) The affected miner may be transferred back to the miner's initial work area or occupation when temporary use of respirators under paragraph (a) of this section or section 60.13 is no longer required.

(c) Respiratory protection requirements at all mines. (1) Affected miners shall be provided with a NIOSH-approved atmosphere-supplying respirator or NIOSH-approved air-purifying respirator equipped with the following:

(i) Particulate protection classified as 100 series under 42 CFR part 84; or

(ii) Particulate protection classified as High Efficiency “HE” under 42 CFR part 84.

(2) When approved respirators are used, the mine operator must have a written respiratory protection program that meets the following requirements in accordance with ASTM F3387-19: program administration; written standard operating procedures; medical evaluation; respirator selection; training; fit testing; maintenance, inspection, and storage. ASTM F3387-19, Standard Practice for Respiratory Protection, approved August 1, 2019, is incorporated by reference into this section with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. This incorporation by reference (IBR) material is available for inspection at the Mine Safety and Health Administration (MSHA) and at the National Archives and Records Administration (NARA). Contact MSHA at: MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; (202) 693-9440; or any Mine Safety and Health Enforcement District Office. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email fr.inspection@nara.gov. The material may be obtained from ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; www.astm.org.

[89 FR 28470, Apr. 18, 2024, as amended at 91 FR 9448, Feb. 26, 2026]

§ 60.15 Medical surveillance for metal and nonmetal mines.

(a) Medical surveillance. Each operator of a metal and nonmetal mine shall provide to each miner periodic medical examinations performed by a physician or other licensed health care professional (PLHCP) or specialist, as defined in § 60.2, at no cost to the miner.

(1) Medical examinations shall be provided at frequencies specified in this section.

(2) Medical examinations shall include:

(i) A medical and work history, with emphasis on: past and present exposure to respirable crystalline silica, dust, and other agents affecting the respiratory system; any history of respiratory system dysfunction, including diagnoses and symptoms of respiratory disease (e.g., shortness of breath, cough, wheezing); history of tuberculosis; and smoking status and history;

(ii) A physical examination with special emphasis on the respiratory system;

(iii) A chest X-ray (a single posteroanterior radiographic projection or radiograph of the chest at full inspiration recorded on either film (no less than 14 x 17 inches and no more than 16 x 17 inches) or digital radiography systems), classified according to the International Labour Office (ILO) International Classification of Radiographs of Pneumoconioses by a NIOSH-certified B Reader; and

(iv) A pulmonary function test to include forced vital capacity (FVC) and forced expiratory volume in one second (FEV1) and FEV1/FVC ratio, administered by a spirometry technician with a current certificate from a NIOSH-approved Spirometry Program Sponsor or by a pulmonary function technologist with a current credential from the National Board for Respiratory Care.

(b) Voluntary medical examinations. Each mine operator shall provide the opportunity to all miners employed at the mine to have the medical examinations specified in paragraph (a) of this section as follows:

(1) During an initial 12-month period; and

(2) At least every 5 years after the end of the period in paragraph (b)(1). The medical examinations shall be available during a 6-month period that begins no less than 3.5 years and not more than 4.5 years from the end of the last 6-month period.

(c) Mandatory medical examinations. For each miner who begins work in the mining industry for the first time, the mine operator shall provide medical examinations specified in paragraph (a) of this section as follows:

(1) An initial medical examination no later than 60 days after beginning employment;

(2) A follow-up medical examination no later than 3 years after the initial examination in paragraph (c)(1) of this section; and

(3) A follow-up medical examination conducted by a specialist no later than 2 years after the examinations in paragraph (c)(2) of this section if the chest X-ray shows evidence of pneumoconiosis or the spirometry examination indicates evidence of decreased lung function.

(d) Medical examinations results. (1) The mine operator shall ensure that the results of medical examinations or tests made pursuant to this section shall be provided from the PLHCP or specialist within 30 days of the medical examination to the miner, and at the request of the miner, to the miner's designated physician or another designee identified by the miner.

(2) The mine operator shall ensure that, within 30 days of the medical examination, the PLHCP or specialist provides the results of chest X-ray classifications to the National Institute for Occupational Safety and Health (NIOSH), once NIOSH establishes a reporting system.

(e) Written medical opinion. The mine operator shall obtain a written medical opinion from the PLHCP or specialist within 30 days of the medical examination. The written opinion shall contain only the following:

(1) The date of the medical examination;

(2) A statement that the examination has met the requirements of this section; and

(3) Any recommended limitations on the miner's use of respirators.

(f) Written medical opinion records. The mine operator shall maintain a record of the written medical opinions received from the PLHCP or specialist under paragraph (e) of this section.

§ 60.16 Recordkeeping requirements.

(a) Table 1 to this paragraph (a) lists the records the mine operator shall retain and their retention period.

(1) Evaluation records made under § 60.12(c) shall be retained for at least 5 years from the date of each evaluation.

(2) Sampling records made under § 60.12(g) shall be retained for at least 5 years from the sample date.

(3) Corrective actions records made under § 60.13(c) shall be retained for at least 5 years from the date of each corrective action. These records must be stored with the records of related sampling under § 60.12(g).

(4) Written determination records received from a PLHCP under § 60.14(b) shall be retained for the duration of the miner's employment plus 6 months.

(5) Written medical opinion records received from a PLHCP or specialist under § 60.15(f) shall be retained for the duration of the miner's employment plus 6 months.

Table 1 to Paragraph (a)—Recordkeeping Requirements

Record | Section references | Retention period

1. Evaluation records | § 60.12(c) | At least 5 years from date of each evaluation.

2. Sampling records | § 60.12(g) | At least 5 years from sample date.

3. Corrective actions records | § 60.13(c) | At least 5 years from date of each corrective action.

4. Written determination records received from a PLHCP | § 60.14(b) | Duration of miner's employment plus 6 months.

5. Written medical opinion records received from a PLHCP or specialist | § 60.15(f) | Duration of miner's employment plus 6 months.

(b) Upon request from an authorized representative of the Secretary, from an authorized representative of miners, or from miners, mine operators shall promptly provide access to any record listed in this section.

§ 60.17 Severability.

Each section of this part, as well as sections in 30 CFR parts 56, 57, 70, 71, 72, 75, and 90 that address respirable crystalline silica or respiratory protection, is separate and severable from the other sections and provisions. If any provision of this subpart is held to be invalid or unenforceable by its terms, or as applied to any person, entity, or circumstance, or is stayed or enjoined, that provision shall be construed so as to continue to give the maximum effect to the provision permitted by law, unless such holding shall be one of utter invalidity or unenforceability, in which event the provision shall be severable from these sections and shall not affect the remainder thereof.

PART 62 OCCUPATIONAL NOISE EXPOSURE

Authority: 30 U.S.C. 811.

Source: 64 FR 49630, Sept. 13, 1999, unless otherwise noted.

§ 62.100 Purpose and scope; effective date.

The purpose of these standards is to prevent the occurrence and reduce the progression of occupational noise-induced hearing loss among miners. This part sets forth mandatory health standards for each surface and underground metal, nonmetal, and coal mine subject to the Federal Mine Safety and Health Act of 1977. The provisions of this part become effective September 13, 2000.

§ 62.101 Definitions.

The following definitions apply in this part:

Access. The right to examine and copy records.

Action level. An 8-hour time-weighted average sound level (TWA8) of 85 dBA, or equivalently a dose of 50%, integrating all sound levels from 80 dBA to at least 130 dBA.

Audiologist. A professional, specializing in the study and rehabilitation of hearing, who is certified by the American Speech-Language-Hearing Association (ASHA) or licensed by a state board of examiners.

Baseline audiogram. The audiogram recorded in accordance with § 62.170(a) of this part against which subsequent audiograms are compared to determine the extent of hearing loss.

Criterion level. The sound level which if constantly applied for 8 hours results in a dose of 100% of that permitted by the standard.

Decibel (dB). A unit of measure of sound pressure levels, defined in one of two ways, depending upon the use:

(1) For measuring sound pressure levels, the decibel is 20 times the common logarithm of the ratio of the measured sound pressure to the standard reference sound pressure of 20 micropascals (µPa), which is the threshold of normal hearing sensitivity at 1000 Hertz (Hz).

(2) For measuring hearing threshold levels, the decibel is the difference between audiometric zero (reference pressure equal to 0 hearing threshold level) and the threshold of hearing of the individual being tested at each test frequency.

Dual Hearing Protection Level. A TWA8 of 105 dBA, or equivalently, a dose of 800% of that permitted by the standard, integrating all sound levels from 90 dBA to at least 140 dBA.

Exchange rate. The amount of increase in sound level, in decibels, which would require halving of the allowable exposure time to maintain the same noise dose. For the purposes of this part, the exchange rate is 5 decibels (5 dB).

Hearing protector. Any device or material, capable of being worn on the head or in the ear canal, sold wholly or in part on the basis of its ability to reduce the level of sound entering the ear, and which has a scientifically accepted indicator of noise reduction value.

Hertz (Hz). Unit of measurement of frequency numerically equal to cycles per second.

Medical pathology. A condition or disease affecting the ear.

Miner's designee. Any individual or organization to whom a miner gives written authorization to exercise a right of access to records.

Qualified technician. A technician who has been certified by the Council for Accreditation in Occupational Hearing Conservation (CAOHC), or by another recognized organization offering equivalent certification.

Permissible exposure level. A TWA8 of 90 dBA or equivalently a dose of 100% of that permitted by the standard, integrating all sound levels from 90 dBA to at least 140 dBA.

Reportable hearing loss. A change in hearing sensitivity for the worse, relative to the miner's baseline audiogram, or the miner's revised baseline audiogram where one has been established in accordance with § 62.170(c)(2), of an average of 25 dB or more at 2000, 3000, and 4000 Hz in either ear.

Revised baseline audiogram. An annual audiogram designated to be used in lieu of a miner's original baseline audiogram in measuring changes in hearing sensitivity as a result of the circumstances set forth in §§ 62.170(c)(1) or 62.170(c)(2) of this part.

Sound level. The sound pressure level in decibels measured using the A-weighting network and a slow response, expressed in the unit dBA.

Standard threshold shift. A change in hearing sensitivity for the worse relative to the miner's baseline audiogram, or relative to the most recent revised baseline audiogram where one has been established, of an average of 10 dB or more at 2000, 3000, and 4000 Hz in either ear.

Time-weighted average-8 hour (TWA8). The sound level which, if constant over 8 hours, would result in the same noise dose as is measured.

§ 62.110 Noise exposure assessment.

(a) The mine operator must establish a system of monitoring that evaluates each miner's noise exposure sufficiently to determine continuing compliance with this part.

(b) The mine operator must determine a miner's noise dose (D, in percent) by using a noise dosimeter or by computing the formula: D = 100(C1/T1 + C2/T2 + . . . . + Cn/Tn), where Cn is the total time the miner is exposed at a specified sound level, and Tn is the reference duration of exposure at that sound level shown in Table 62-1.

(1) The mine operator must use Table 62-2 when converting from dose readings to equivalent TWA8 readings.

(2) A miner's noise dose determination must:

(i) Be made without adjustment for the use of any hearing protector;

(ii) Integrate all sound levels over the appropriate range;

(iii) Reflect the miner's full work shift;

(iv) Use a 90-dB criterion level and a 5-dB exchange rate; and

(v) Use the A-weighting and slow response instrument settings.

(c) Observation of monitoring. The mine operator must provide affected miners and their representatives with an opportunity to observe noise exposure monitoring required by this section and must give prior notice of the date and time of intended exposure monitoring to affected miners and their representatives.

(d) Miner notification. The mine operator must notify a miner of his or her exposure when the miner's exposure is determined to equal or exceed the action level, exceed the permissible exposure level, or exceed the dual hearing protection level, provided the mine operator has not notified the miner of an exposure at such level within the prior 12 months. The mine operator must base the notification on an exposure evaluation conducted either by the mine operator or by an authorized representative of the Secretary of Labor. The mine operator must notify the miner in writing within 15 calendar days of:

(1) The exposure determination; and (2) the corrective action being taken.

(e) The mine operator must maintain a copy of any such miner notification, or a list on which the relevant information about that miner's notice is recorded, for the duration of the affected miner's exposure at or above the action level and for at least 6 months thereafter.

§ 62.120 Action level.

If during any work shift a miner's noise exposure equals or exceeds the action level the mine operator must enroll the miner in a hearing conservation program that complies with § 62.150 of this part.

§ 62.130 Permissible exposure level.

(a) The mine operator must assure that no miner is exposed during any work shift to noise that exceeds the permissible exposure level. If during any work shift a miner's noise exposure exceeds the permissible exposure level, the mine operator must use all feasible engineering and administrative controls to reduce the miner's noise exposure to the permissible exposure level, and enroll the miner in a hearing conservation program that complies with § 62.150 of this part. When a mine operator uses administrative controls to reduce a miner's exposure, the mine operator must post the procedures for such controls on the mine bulletin board and provide a copy to the affected miner.

(b) If a miner's noise exposure continues to exceed the permissible exposure level despite the use of all feasible engineering and administrative controls, the mine operator must continue to use the engineering and administrative controls to reduce the miner's noise exposure to as low a level as is feasible.

(c) The mine operator must assure that no miner is exposed at any time to sound levels exceeding 115 dBA, as determined without adjustment for the use of any hearing protector.

§ 62.140 Dual hearing protection level.

If during any work shift a miner's noise exposure exceeds the dual hearing protection level, the mine operator must, in addition to the actions required for noise exposures that exceed the permissible exposure level, provide and ensure the concurrent use of both an ear plug and an ear muff type hearing protector. The following table sets out mine operator actions under MSHA's noise standard.

Provision | Condition | Action required by the mine operator

§ 62.120 | Miner's noise exposure is less than the action level | None.

§ 62.120 | Miner's exposure equals or exceeds the action level, but does not exceed the permissible exposure level (PEL) | Operator enrolls the miner in hearing conservation program (HCP) which includes (1) a system of monitoring, (2) voluntary, with two exceptions, use of operator-provided hearing protectors, (3) voluntary audiometric testing, (4) training, and (5) record keeping.

§ 62.130 | Miner's exposure exceeds the PEL | Operator uses/continues to use all feasible engineering and administrative controls to reduce exposure to PEL; enrolls the miner in a HCP including ensured use of operator-provided hearing protectors; posts administrative controls and provides copy to affected miner; must never permit a miner to be exposed to sound levels exceeding 115 dBA.

§ 62.140 | Miner's exposure exceeds the dual hearing protection level | Operator enrolls the miner in a HCP, continues to meet all the requirements of § 62.130, ensures concurrent use of earplug and earmuff.

§ 62.150 Hearing conservation program.

A hearing conservation program established under this part must include:

(a) A system of monitoring under § 62.110 of this part;

(b) The provision and use of hearing protectors under § 62.160 of this part;

(c) Audiometric testing under §§ 62.170 through 62.175 of this part;

(d) Training under § 62.180 of this part; and

(e) Recordkeeping under § 62.190 of this part.

§ 62.160 Hearing protectors.

(a) A mine operator must provide a hearing protector to a miner whose noise exposure equals or exceeds the action level under § 62.120 of this part. In addition, the mine operator must:

(1) Train the miner in accordance with § 62.180 of this part;

(2) Allow the miner to choose a hearing protector from at least two muff types and two plug types, and in the event dual hearing protectors are required, to choose one of each type;

(3) Ensure that the hearing protector is in good condition and is fitted and maintained in accordance with the manufacturer's instructions;

(4) Provide the hearing protector and necessary replacements at no cost to the miner; and

(5) Allow the miner to choose a different hearing protector(s), if wearing the selected hearing protector(s) is subsequently precluded due to medical pathology of the ear.

(b) The mine operator must ensure, after satisfying the requirements of paragraph (a) of this section, that a miner wears a hearing protector whenever the miner's noise exposure exceeds the permissible exposure level before the implementation of engineering and administrative controls, or if the miner's noise exposure continues to exceed the permissible exposure level despite the use of all feasible engineering and administrative controls.

(c) The mine operator must ensure, after satisfying the requirements of paragraph (a) of this section, that a miner wears a hearing protector when the miner's noise exposure is at or above the action level, if:

(1) The miner has incurred a standard threshold shift; or

(2) More than 6 months will pass before the miner can take a baseline audiogram.

§ 62.170 Audiometric testing.

The mine operator must provide audiometric tests to satisfy the requirements of this part at no cost to the miner. A physician or an audiologist, or a qualified technician under the direction or supervision of a physician or an audiologist must conduct the tests.

(a) Baseline audiogram. The mine operator must offer miners the opportunity for audiometric testing of the miner's hearing sensitivity for the purpose of establishing a valid baseline audiogram to compare with subsequent annual audiograms. The mine operator may use an existing audiogram of the miner's hearing sensitivity as the baseline audiogram if it meets the audiometric testing requirements of § 62.171 of this part.

(1) The mine operator must offer and provide within 6 months of enrolling the miner in a hearing conservation program, audiometric testing which results in a valid baseline audiogram, or offer and provide the testing within 12 months where the operator uses mobile test vans to do the testing.

(2) The mine operator must notify the miner to avoid high levels of noise for at least 14 hours immediately preceding the baseline audiogram. The mine operator must not expose the miner to workplace noise for the 14-hour quiet period before conducting the audiometric testing to determine a baseline audiogram. The operator may substitute the use of hearing protectors for this quiet period.

(3) The mine operator must not establish a new baseline audiogram or a new revised baseline audiogram, where one has been established, due to changes in enrollment status in the hearing conservation program. The mine operator may establish a new baseline or revised baseline audiogram for a miner who is away from the mine for more than 6 consecutive months.

(b) Annual audiogram. After the baseline audiogram is established, the mine operator must continue to offer subsequent audiometric tests at intervals not exceeding 12 months for as long as the miner remains in the hearing conservation program.

(c) Revised baseline audiogram. An annual audiogram must be deemed to be a revised baseline audiogram when, in the judgment of the physician or audiologist:

(1) A standard threshold shift revealed by the audiogram is permanent; or (2) The hearing threshold shown in the annual audiogram indicates significant improvement over the baseline audiogram.

§ 62.171 Audiometric test procedures.

(a) All audiometric testing under this part must be conducted in accordance with scientifically validated procedures. Audiometric tests must be pure tone, air conduction, hearing threshold examinations, with test frequencies including 500, 1000, 2000, 3000, 4000, and 6000 Hz. Each ear must be tested separately.

(b) The mine operator must compile an audiometric test record for each miner tested. The record must include:

(1) Name and job classification of the miner tested;

(2) A copy of all of the miner's audiograms conducted under this part;

(3) Evidence that the audiograms were conducted in accordance with paragraph (a) of this section;

(4) Any exposure determination for the miner conducted in accordance with § 62.110 of this part; and

(5) The results of follow-up examination(s), if any.

(c) The operator must maintain audiometric test records for the duration of the affected miner's employment, plus at least 6 months, and make the records available for inspection by an authorized representative of the Secretary of Labor.

§ 62.172 Evaluation of audiograms.

(a) The mine operator must:

(1) Inform persons evaluating audiograms of the requirements of this part and provide those persons with a copy of the miner's audiometric test records;

(2) Have a physician or an audiologist, or a qualified technician who is under the direction or supervision of a physician or audiologist:

(i) Determine if the audiogram is valid; and

(ii) Determine if a standard threshold shift or a reportable hearing loss, as defined in this part, has occurred.

(3) Instruct the physician, audiologist, or qualified technician not to reveal to the mine operator, without the written consent of the miner, any specific findings or diagnoses unrelated to the miner's hearing loss due to occupational noise or the wearing of hearing protectors; and

(4) Obtain the results and the interpretation of the results of audiograms conducted under this part within 30 calendar days of conducting the audiogram.

(b)(1) The mine operator must provide an audiometric retest within 30 calendar days of receiving a determination that an audiogram is invalid, provided any medical pathology has improved to the point that a valid audiogram may be obtained.

(2) If an annual audiogram demonstrates that the miner has incurred a standard threshold shift or reportable hearing loss, the mine operator may provide one retest within 30 calendar days of receiving the results of the audiogram and may use the results of the retest as the annual audiogram.

(c) In determining whether a standard threshold shift or reportable hearing loss has occurred, allowance may be made for the contribution of aging (presbycusis) to the change in hearing level. The baseline, or the revised baseline as appropriate, and the annual audiograms used in making the determination should be adjusted according to the following procedure:

(1) Determine from Tables 62-3 or 62-4 the age correction values for the miner by:

(i) Finding the age at which the baseline audiogram or revised baseline audiogram, as appropriate, was taken, and recording the corresponding values of age corrections at 2000, 3000, and 4000 Hz;

(ii) Finding the age at which the most recent annual audiogram was obtained and recording the corresponding values of age corrections at 2000, 3000, and 4000 Hz; and

(iii) Subtracting the values determined in paragraph (c)(1)(i) of this section from the values determined in paragraph (c)(1)(ii) of this section. The differences calculated represent that portion of the change in hearing that may be due to aging.

(2) Subtract the values determined in paragraph (c)(1)(iii) of this section from the hearing threshold levels found in the annual audiogram to obtain the adjusted annual audiogram hearing threshold levels.

(3) Subtract the hearing threshold levels in the baseline audiogram or revised baseline audiogram from the adjusted annual audiogram hearing threshold levels determined in paragraph (c)(2) of this section to obtain the age-corrected threshold shifts.

§ 62.173 Follow-up evaluation when an audiogram is invalid.

(a) If a valid audiogram cannot be obtained due to a suspected medical pathology of the ear that the physician or audiologist believes was caused or aggravated by the miner's occupational exposure to noise or the wearing of hearing protectors, the mine operator must refer the miner for a clinical-audiological evaluation or an otological examination, as appropriate, at no cost to the miner.

(b) If a valid audiogram cannot be obtained due to a suspected medical pathology of the ear that the physician or audiologist concludes is unrelated to the miner's occupational exposure to noise or the wearing of hearing protectors, the mine operator must instruct the physician or audiologist to inform the miner of the need for an otological examination.

(c) The mine operator must instruct the physician, audiologist, or qualified technician not to reveal to the mine operator, without the written consent of the miner, any specific findings or diagnoses unrelated to the miner's occupational exposure to noise or the wearing of hearing protectors.

§ 62.174 Follow-up corrective measures when a standard threshold shift is detected.

The mine operator must, within 30 calendar days of receiving evidence or confirmation of a standard threshold shift, unless a physician or audiologist determines the standard threshold shift is neither work-related nor aggravated by occupational noise exposure:

(a) Retrain the miner, including the instruction required by § 62.180 of this part;

(b) Provide the miner with the opportunity to select a hearing protector, or a different hearing protector if the miner has previously selected a hearing protector, from among those offered by the mine operator in accordance with § 62.160 of this part; and

(c) Review the effectiveness of any engineering and administrative controls to identify and correct any deficiencies.

§ 62.175 Notification of results; reporting requirements.

(a) The mine operator must, within 10 working days of receiving the results of an audiogram, or receiving the results of a follow-up evaluation required under § 62.173 of this part, notify the miner in writing of:

(1) The results and interpretation of the audiometric test, including any finding of a standard threshold shift or reportable hearing loss; and

(2) The need and reasons for any further testing or evaluation, if applicable.

(b) When evaluation of the audiogram shows that a miner has incurred a reportable hearing loss as defined in this part, the mine operator must report such loss to MSHA as a noise-induced hearing loss in accordance with part 50 of this title, unless a physician or audiologist has determined that the loss is neither work-related nor aggravated by occupational noise exposure.

§ 62.180 Training.

(a) The mine operator must, within 30 days of a miner's enrollment into a hearing conservation program, provide the miner with training. The mine operator must give training every 12 months thereafter if the miner's noise exposure continues to equal or exceed the action level. Training must include:

(1) The effects of noise on hearing;

(2) The purpose and value of wearing hearing protectors;

(3) The advantages and disadvantages of the hearing protectors to be offered;

(4) The various types of hearing protectors offered by the mine operator and the care, fitting, and use of each type;

(5) The general requirements of this part;

(6) The mine operator's and miner's respective tasks in maintaining mine noise controls; and

(7) The purpose and value of audiometric testing and a summary of the procedures.

(b) The mine operator must certify the date and type of training given each miner, and maintain the miner's most recent certification for as long as the miner is enrolled in the hearing conservation program and for at least 6 months thereafter.

§ 62.190 Records.

(a) The authorized representatives of the Secretaries of Labor and Health and Human Services must have access to all records required under this part. Upon written request, the mine operator must provide, within 15 calendar days of the request, access to records to:

(1) The miner, or with the miner's written consent, the miner's designee, for all records that the mine operator must maintain for that individual miner under this part;

(2) Any representative of miners designated under part 40 of this title, to training certifications compiled under § 62.180(b) of this part and to any notice of exposure determination under § 62.110(d) of this part, for the miners whom he or she represents; and

(3) Any former miner, for records which indicate his or her own exposure.

(b) When a person with access to records under paragraphs (a)(1), (a)(2), or (a)(3) of this section requests a copy of a record, the mine operator must provide the first copy of such record at no cost to that person, and any additional copies requested by that person at reasonable cost.

(c) Transfer of records. (1) The mine operator must transfer all records required to be maintained by this part, or a copy thereof, to a successor mine operator who must maintain the records for the time period required by this part.

(2) The successor mine operator must use the baseline audiogram, or revised baseline audiogram, as appropriate, obtained by the original mine operator to determine the existence of a standard threshold shift or reportable hearing loss.

Appendix to Appendix to Part 62

Table 62-1—Reference Duration

dBA | T (hours)

80 | 32.0

85 | 16.0

86 | 13.9

87 | 12.1

88 | 10.6

89 | 9.2

90 | 8.0

91 | 7.0

92 | 6.1

93 | 5.3

94 | 4.6

95 | 4.0

96 | 3.5

97 | 3.0

98 | 2.6

99 | 2.3

100 | 2.0

101 | 1.7

102 | 1.5

103 | 1.3

104 | 1.1

105 | 1.0

106 | 0.87

107 | 0.76

108 | 0.66

109 | 0.57

110 | 0.50

111 | 0.44

112 | 0.38

113 | 0.33

114 | 0.29

115 | 0.25

At no time shall any excursion exceed 115 dBA. For any value, the reference duration (T) in hours is computed by: T = 8/2(L−90)/5 where L is the measured A-weighted, slow-response sound pressure level.

Table 62-2—“Dose”TWA 8 Equivalent

Dose | TWA 8 (percent)

25 | 80

29 | 81

33 | 82

38 | 83

44 | 84

50 | 85

57 | 86

66 | 87

76 | 88

87 | 89

100 | 90

115 | 91

132 | 92

152 | 93

174 | 94

200 | 95

230 | 96

264 | 97

303 | 98

350 | 99

400 | 100

460 | 101

530 | 102

610 | 103

700 | 104

800 | 105

920 | 106

1056 | 107

1213 | 108

1393 | 109

1600 | 110

1838 | 111

2111 | 112

2425 | 113

2786 | 114

3200 | 115

Interpolate between the values found in this Table, or extend the Table, by using the formula: TWA8 = 16.61 log10 (D/100) + 90.

Table 62-3—Age Correction Value in Decibels for Males (Selected Frequencies)

Age (years) | kHz

2 | 3 | 4

20 or less | 3 | 4 | 5

21 | 3 | 4 | 5

22 | 3 | 4 | 5

23 | 3 | 4 | 6

24 | 3 | 5 | 6

25 | 3 | 5 | 7

26 | 4 | 5 | 7

27 | 4 | 6 | 7

28 | 4 | 6 | 8

29 | 4 | 6 | 8

30 | 4 | 6 | 9

31 | 4 | 7 | 9

32 | 5 | 7 | 10

33 | 5 | 7 | 10

34 | 5 | 8 | 11

35 | 5 | 8 | 11

36 | 5 | 9 | 12

37 | 6 | 9 | 12

38 | 6 | 9 | 13

39 | 6 | 10 | 14

40 | 6 | 10 | 14

41 | 6 | 10 | 14

42 | 7 | 11 | 16

43 | 7 | 12 | 16

44 | 7 | 12 | 17

45 | 7 | 13 | 18

46 | 8 | 13 | 19

47 | 8 | 14 | 19

48 | 8 | 14 | 20

49 | 9 | 15 | 21

50 | 9 | 16 | 22

51 | 9 | 16 | 23

52 | 10 | 17 | 24

53 | 10 | 18 | 25

54 | 10 | 18 | 26

55 | 11 | 19 | 27

56 | 11 | 20 | 28

57 | 11 | 21 | 29

58 | 12 | 22 | 31

59 | 12 | 22 | 32

60 or more | 13 | 23 | 33

Table 62-4—Age Correction Value in Decibels for Females (Selected Frequencies)

Age (years) | kHz

2 | 3 | 4

20 or less | 4 | 3 | 3

21 | 4 | 4 | 3

22 | 4 | 4 | 4

23 | 5 | 4 | 4

24 | 5 | 4 | 4

25 | 5 | 4 | 4

26 | 5 | 5 | 4

27 | 5 | 5 | 5

28 | 5 | 5 | 5

29 | 5 | 5 | 5

30 | 6 | 5 | 5

31 | 6 | 6 | 5

32 | 6 | 6 | 6

33 | 6 | 6 | 6

34 | 6 | 6 | 6

35 | 6 | 7 | 7

36 | 7 | 7 | 7

37 | 7 | 7 | 7

38 | 7 | 7 | 7

39 | 7 | 8 | 8

40 | 7 | 8 | 8

41 | 8 | 8 | 8

42 | 8 | 9 | 9

43 | 8 | 9 | 9

44 | 8 | 9 | 9

45 | 8 | 10 | 10

46 | 9 | 10 | 10

47 | 9 | 10 | 11

48 | 9 | 11 | 11

49 | 9 | 11 | 11

50 | 10 | 11 | 12

51 | 10 | 11 | 12

52 | 10 | 12 | 13

53 | 10 | 13 | 13

54 | 11 | 13 | 14

55 | 11 | 14 | 14

56 | 11 | 14 | 15

57 | 11 | 15 | 15

58 | 12 | 15 | 16

59 | 12 | 16 | 16

60 or more | 12 | 16 | 17

[64 FR 49630, Sept. 13, 1999, as amended at 65 FR 66929, Nov. 8, 2000]

N [RESERVED] SUBCHAPTER N [RESERVED]

SUBCHAPTER O COAL MINE SAFETY AND HEALTH

PART 70 MANDATORY HEALTH STANDARDS—UNDERGROUND COAL MINES

Authority: 30 U.S.C. 811, 813(h), 957.

Source: 59 FR 8327, Feb 18, 1994, unless otherwise noted.

Subpart A General

Source: 79 FR 24972, May 1, 2014, unless otherwise noted.

§ 70.1 Scope.

This part 70 sets forth mandatory health standards for each underground coal mine subject to the Federal Mine Safety and Health Act of 1977, as amended.

§ 70.2 Definitions.

The following definitions apply in this part.

Act. The Federal Mine Safety and Health Act of 1977, Public Law 91-173, as amended by Public Law 95-164 and Public Law 109-236.

Active workings. Any place in a coal mine where miners are normally required to work or travel.

Approved sampling device. A sampling device approved by the Secretary and Secretary of Health and Human Services (HHS) under part 74 of this title.

Certified person. An individual certified by the Secretary in accordance with § 70.202 to take respirable dust samples required by this part or certified in accordance with § 70.203 to perform the maintenance and calibration of respirable dust sampling equipment as required by this part.

Coal mine dust personal sampler unit (CMDPSU). A personal sampling device approved under part 74, subpart B, of this title.

Concentration. A measure of the amount of a substance contained per unit volume of air.

Continuous personal dust monitor (CPDM). A personal sampling device approved under part 74, subpart C of this title.

Designated area (DA). A specific location in the mine identified by the operator in the mine ventilation plan under § 75.371(t) of this title where samples will be collected to measure respirable dust generation sources in the active workings; approved by the District Manager; and assigned a four-digit identification number by MSHA.

Designated occupation (DO). The occupation on a mechanized mining unit (MMU) that has been determined by results of respirable dust samples to have the greatest respirable dust concentration.

District Manager. The manager of the Coal Mine Safety and Health District in which the mine is located.

Equivalent concentration. The concentration of respirable coal mine dust, including quartz, expressed in milligrams per cubic meter of air (mg/m 3) as measured with an approved sampling device, determined by dividing the weight of dust in milligrams collected on the filter of an approved sampling device by the volume of air in cubic meters passing through the filter (sampling time in minutes (t) times the sampling airflow rate in cubic meters per minute), and then converting that concentration to an equivalent concentration as measured by the Mining Research Establishment (MRE) instrument. When the approved sampling device is:

(1) The CMDPSU, the equivalent concentration is determined by multiplying the concentration of respirable coal mine dust by the constant factor prescribed by the Secretary.

(2) The CPDM, the device shall be programmed to automatically report end-of-shift concentration measurements as equivalent concentrations.

Mechanized mining unit (MMU). A unit of mining equipment including hand loading equipment used for the production of material; or a specialized unit which uses mining equipment other than specified in § 70.206(b) or in § 70.208(b) of this part. Each MMU will be assigned a four-digit identification number by MSHA, which is retained by the MMU regardless of where the unit relocates within the mine. However, when:

(1) Two sets of mining equipment are used in a series of working places within the same working section and only one production crew is employed at any given time on either set of mining equipment, the two sets of equipment shall be identified as a single MMU.

(2) Two or more sets of mining equipment are simultaneously engaged in cutting, mining, or loading coal or rock from working places within the same working section, each set of mining equipment shall be identified as a separate MMU.

MRE instrument. The gravimetric dust sampler with a four channel horizontal elutriator developed by the Mining Research Establishment of the National Coal Board, London, England.

MSHA. The Mine Safety and Health Administration of the U.S. Department of Labor.

Normal production shift. A production shift during which the amount of material produced by an MMU is at least equal to 80 percent of the average production recorded by the operator for the most recent 30 production shifts or for all production shifts if fewer than 30 shifts of production data are available.

Other designated occupation (ODO). Other occupation on an MMU that is designated for sampling required by this part in addition to the DO. Each ODO shall be identified by a four-digit identification number assigned by MSHA.

Production shift. With regard to an MMU, a shift during which material is produced; with regard to a DA of a mine, a shift during which material is produced and routine day-to-day activities are occurring in the DA.

Representative sample. A respirable dust sample, expressed as an equivalent concentration, that reflects typical dust concentration levels and with regard to an MMU, normal mining activities in the active workings during which the amount of material produced is equivalent to a normal production shift; or with regard to a DA, material is produced and routine-day-to-day activities are occurring.

Respirable dust. Dust collected with a sampling device approved by the Secretary and the Secretary of HHS in accordance with part 74 (Coal Mine Dust Sampling Devices) of this title.

Secretary. The Secretary of Labor or a delegate.

Valid respirable dust sample. A respirable dust sample collected and submitted as required by this part, including any sample for which the data were electronically transmitted to MSHA, and not voided by MSHA.

[79 FR 24972, May 1, 2014, as amended at 89 FR 28473, Apr. 18, 2024]

Subpart B Dust Standards

Source: 79 FR 24973, May 1, 2014, unless otherwise noted.

§ 70.100 Respirable dust standards.

(a) Each operator shall continuously maintain the average concentration of respirable dust in the mine atmosphere during each shift to which each miner in the active workings of each mine is exposed, as measured with an approved sampling device and expressed in terms of an equivalent concentration, at or below:

(1) 2.0 milligrams of respirable dust per cubic meter of air (mg/m 3).

(2) 1.5 mg/m 3 as of August 1, 2016.

(b) Each operator shall continuously maintain the average concentration of respirable dust within 200 feet outby the working faces of each section in the intake airways as measured with an approved sampling device and expressed in terms of an equivalent concentration at or below:

(1) 1.0 mg/m 3.

(2) 0.5 mg/m 3 as of August 1, 2016.

§ 70.101 [Reserved]
Subpart C Sampling Procedures

Source: 79 FR 24974, May 1, 2014, unless otherwise noted.

§ 70.201 Sampling; general and technical requirements.

(a) Only an approved coal mine dust personal sampler unit (CMDPSU) shall be used to take bimonthly samples of the concentration of respirable coal mine dust from the designated occupation (DO) in each MMU as required by this part until January 31, 2016. On February 1, 2016, DOs in each MMU shall be sampled quarterly with an approved CPDM as required by this part and an approved CMDPSU shall not be used, unless notified by the Secretary to continue to use an approved CMDPSU to conduct quarterly sampling.

(b) Only an approved CMDPSU shall be used to take bimonthly samples of the concentration of respirable coal mine dust from each designated area (DA) as required by this part until January 31, 2016. On February 1, 2016:

(1) DAs associated with an MMU shall be redesignated as Other Designated Occupations (ODO). ODOs shall be sampled quarterly with an approved CPDM as required by this part and an approved CMDPSU shall not be used, unless notified by the Secretary to continue to use an approved CMDPSU to conduct quarterly sampling.

(2) DAs identified by the operator under § 75.371(t) of this chapter shall be sampled quarterly with an approved CMDPSU as required by this part, unless the operator notifies the District Manager in writing that only an approved CPDM will be used for all DA sampling at the mine. The notification must be received at least 90 days before the beginning of the quarter in which CPDMs will be used to collect the DA samples.

(c) Sampling devices shall be worn or carried directly to the MMU or DA to be sampled and from the MMU or DA sampled and shall be operated portal-to-portal. Sampling devices shall remain with the occupation or DA being sampled and shall be operational during the entire shift, which includes the total time spent in the MMU or DA and while traveling to and from the mining section or area being sampled. If the work shift to be sampled is longer than 12 hours and the sampling device is:

(1) A CMDPSU, the operator shall switch-out the unit's sampling pump prior to the 13th-hour of operation.

(2) A CPDM, the operator shall switch-out the CPDM with a fully charged device prior to the 13th-hour of operation.

(d) If using a CMDPSU, one control filter shall be used for each shift of sampling. Each control filter shall:

(1) Have the same pre-weight date (noted on the dust data card) as the filters used for sampling;

(2) Remain plugged at all times;

(3) Be used for the same amount of time, and exposed to the same temperature and handling conditions as the filters used for sampling;

(4) Be kept with the exposed samples after sampling and in the same mailing container when transmitted to MSHA.

(e) Records showing the length of each production shift for each MMU shall be made and retained for at least six months and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners, and submitted to the District Manager when requested in writing.

(f) Upon request from the District Manager, the operator shall submit the date and time any respirable dust sampling required by this part will begin. This information shall be submitted at least 48 hours prior to the scheduled sampling.

(g) To establish a normal production shift, the operator shall record the amount of run-of-mine material produced by each MMU during each shift to determine the average production for the most recent 30 production shifts, or for all production shifts if fewer than 30 shifts of production data are available. Production records shall be retained for at least six months and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(h) Operators using CPDMs shall provide training to all miners expected to wear a CPDM. The training shall be completed prior to a miner wearing a CPDM and then every 12 months thereafter. The training shall include:

(1) The importance of monitoring dust concentrations and properly wearing the CPDM.

(2) Explaining the basic features and capabilities of the CPDM;

(3) Discussing the various types of information displayed by the CPDM and how to access that information; and

(4) How to start and stop a short-term sample run during compliance sampling.

(i) An operator shall keep a record of the CPDM training at the mine site for 24 months after completion of the training. An operator may keep the record elsewhere if the record is immediately accessible from the mine site by electronic transmission. Upon request from an authorized representative of the Secretary, Secretary of HHS, or representative of miners, the operator shall promptly provide access to any such training records. The record shall include:

(1) The date of training;

(2) The names of miners trained; and

(3) The subjects included in the training.

(j) An anthracite mine using the full box, open breast, or slant breast mining method may use either a CPDM or a CMDPSU to conduct the required sampling. The mine operator shall notify the District Manager in writing of its decision to not use a CPDM.

(k) MSHA approval of the dust control portion of the operator's mine ventilation plan may be revoked based on samples taken by MSHA or in accordance with this part 70.

§ 70.202 Certified person; sampling.

(a) The respirable dust sampling required by this part shall be performed by a certified person.

(b) To be certified, a person shall complete the applicable MSHA course of instruction and pass the MSHA examination demonstrating competency in sampling procedures. Persons not certified in sampling, and those certified only in maintenance and calibration procedures in accordance with § 70.203(b), are not permitted to collect respirable dust samples required by this part or handle approved sampling devices when being used in sampling.

(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in sampling procedures every three years.

(d) MSHA may revoke a person's certification for failing to properly carry out the required sampling procedures.

§ 70.203 Certified person; maintenance and calibration.

(a) Approved sampling devices shall be maintained and calibrated by a certified person.

(b) To be certified, a person shall complete the applicable MSHA course of instruction and pass the MSHA examination demonstrating competency in maintenance and calibration procedures for approved sampling devices. Necessary maintenance of the sampling head assembly of a CMDPSU, or the cyclone assembly of a CPDM, can be performed by persons certified in sampling or in maintenance and calibration.

(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in maintenance and calibration procedures every three years.

(d) MSHA may revoke a person's certification for failing to properly carry out the required maintenance and calibration procedures.

§ 70.204 Approved sampling devices; maintenance and calibration.

(a) Approved sampling devices shall be maintained as approved under part 74 of this title and calibrated in accordance with MSHA Informational Report IR 1240 (1996) “Calibration and Maintenance Procedures for Coal Mine Respirable Dust Samplers” or in accordance with the manufacturer's recommendations, if using a CPDM. Only persons certified in maintenance and calibration can perform maintenance work on the CPDM or the pump unit of the CMDPSU.

(b) Sampling devices shall be calibrated at the flowrate of 2.0 liters of air per minute (L/min) if using a CMDPSU; at 2.2 L/min if using a CPDM; or at a different flowrate recommended by the manufacturer, before they are put into service and, thereafter, at time intervals recommended by the manufacturer or prescribed by the Secretary or Secretary of HHS.

(c) If using a CMDPSU, each sampling device shall be examined and tested by a person certified in sampling or in maintenance and calibration within 3 hours before the start of the shift on which the approved sampling devices will be used to collect respirable dust samples. This is to assure that the sampling devices are clean and in proper working condition. This examination and testing shall include the following:

(1) Examination of all components of the cyclone assembly to assure that they are clean and free of dust and dirt. This includes examining the interior of the connector barrel (located between the cassette assembly and vortex finder), vortex finder, cyclone body, and grit pot;

(2) Examination of the inner surface of the cyclone body to assure that it is free of scoring or scratch marks on the inner surface of the cyclone where the air flow is directed by the vortex finder into the cyclone body;

(3) Examination of the external hose connecting the pump unit to the sampling head assembly to assure that it is clean and free of leaks; and

(4) Examination of the clamping and positioning of the cyclone body, vortex finder, and cassette to assure that they are rigid, in alignment, firmly in contact, and airtight.

(5) Testing the voltage of each battery while under actual load to assure the battery is fully charged. This requires that a fully assembled and examined sampling head assembly be attached to the pump inlet with the pump unit running when the voltage check is made. The voltage for the batteries used in the CMDPSU shall not be lower than the product of the number of cells in the battery multiplied by the manufacturer's nominal voltage per cell value.

(d) If using a CPDM, the certified person in sampling or in maintenance and calibration shall:

(1) Follow the pre-operational examinations, testing, and set-up procedures, and perform necessary external maintenance recommended by the manufacturer to assure the operational readiness of each CPDM within 3 hours before the start of the shift on which the sampling devices will be used to collect respirable dust samples; and

(2) Perform other required scheduled examinations and maintenance procedures recommended by the manufacturer.

(e) You must proceed in accordance with “Calibration and Maintenance Procedures for Coal Mine Respirable Dust Samplers,” MSHA Informational Report IR 1240 (1996), referenced in paragraph (a) of this section. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may obtain a copy from the MSHA Web site at http://www.msha.gov and you may inspect or obtain a copy at MSHA, Coal Mine Safety and Health, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9500; and at each MSHA Coal Mine Safety and Health District Office, or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

[79 FR 24974, May 1, 2014, as amended at 80 FR 52989, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 70.205 Approved sampling devices; operation; air flowrate.

As of April 14, 2025:

(a) Approved sampling devices shall be operated at the flowrate of 2.0 L/min if using a CMDPSU; at 2.2 L/min if using a CPDM; or at a different flowrate recommended by the manufacturer.

(b) If using a CMDPSU, each approved sampling device shall be examined each shift by a person certified in sampling during:

(1) The second hour after being put into operation to assure it is in the proper location, operating properly, and at the proper flowrate. If the proper flowrate is not maintained, necessary adjustments shall be made by the certified person. This examination is not required if the sampling device is being operated in an anthracite coal mine using the full box, open breast, or slant breast mining method.

(2) The last hour of operation to assure that the sampling device is operating properly and at the proper flowrate. If the proper flowrate is not maintained, the respirable dust sample shall be transmitted to MSHA with a notation by the certified person on the back of the dust data card stating that the proper flowrate was not maintained. Other events occurring during the collection of respirable dust samples that may affect the validity of the sample, such as dropping of the sampling head assembly onto the mine floor, shall be noted on the back of the dust data card.

(c) If using a CPDM, the person certified in sampling shall monitor the dust concentrations and the sampling status conditions being reported by the sampling device at mid-shift or more frequently as specified in the approved mine ventilation plan to assure: The sampling device is in the proper location and operating properly; and the work environment of the occupation or DA being sampled remains in compliance with the standard at the end of the shift. This monitoring is not required if the sampling device is being operated in an anthracite coal mine using the full box, open breast, or slant breast mining method.

[89 FR 28473, 28474, Apr. 18, 2024]

§§ 70.206-70.207 [Reserved]
§ 70.208 Quarterly sampling; mechanized mining units.

As of April 14, 2025:

(a) The operator shall sample each calendar quarter:

(1) The designated occupation (DO) in each MMU on consecutive normal production shifts until 15 valid representative samples are taken. The District Manager may require additional groups of 15 valid representative samples when information indicates the operator has not followed the approved ventilation plan for any MMU.

(2) Each other designated occupation (ODO) specified in paragraphs (b)(1) through (10) of this section in each MMU or specified by the District Manager and identified in the approved mine ventilation plan on consecutive normal production shifts until 15 valid representative samples are taken. Sampling of each ODO type shall begin after fulfilling the sampling requirements of paragraph (a)(1) of this section. When required to sample more than one ODO type, each ODO type must be sampled over separate time periods during the calendar quarter.

(3) The quarterly periods are:

(i) January 1-March 31

(ii) April 1-June 30

(iii) July 1-September 30

(iv) October 1-December 31.

(b) Unless otherwise directed by the District Manager, the approved sampling device shall be worn by the miner assigned to perform the duties of the DO or ODO specified in paragraphs (b)(1) through (10) of this section or by the District Manager for each type of MMU.

(1) Conventional section using cutting machine. DO—The cutting machine operator;

(2) Conventional section blasting off the solid. DO—The loading machine operator;

(3) Continuous mining section other than auger-type. DO—The continuous mining (CM) machine operator or mobile bridge operator when using continuous haulage; ODO—The roof bolting machine operator who works nearest the working face on the return air side of the continuous mining machine; the face haulage operators on MMUs using blowing face ventilation; the face haulage operators on MMUs ventilated by split intake air (“fishtail ventilation”) as part of a super-section; and face haulage operators where two continuous mining machines are operated on an MMU.

(4) Continuous mining section using auger-type machine. DO—The jacksetter who works nearest the working face on the return air side of the continuous mining machine;

(5) Scoop section using cutting machine. DO—The cutting machine operator;

(6) Scoop section, blasting off the solid. DO—The coal drill operator;

(7) Longwall section. DO—The longwall operator working on the tailgate side of the longwall mining machine; ODO—The jacksetter who works nearest the return air side of the longwall working face, and the mechanic;

(8) Hand loading section with a cutting machine. DO—The cutting machine operator;

(9) Hand loading section blasting off the solid. DO—The hand loader exposed to the greatest dust concentration; and

(10) Anthracite mine sections. DO—The hand loader exposed to the greatest dust concentration.

(c) [Reserved]

(d) If a normal production shift is not achieved, the DO or ODO sample for that shift may be voided by MSHA. However, any sample, regardless of production, that exceeds the standard by at least 0.1 mg/m 3 shall be used in the determination of the equivalent concentration for that occupation

(e) When a valid representative sample taken in accordance with this section meets or exceeds the ECV in table 1 to this section that corresponds to the particular sampling device used, the operator shall:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable dust to at or below the respirable dust standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(f) Noncompliance with the standard is demonstrated during the sampling period when:

(1) Three or more valid representative samples meet or exceed the ECV in table 1 to this section that corresponds to the particular sampling device used; or

(2) The average for all valid representative samples meets or exceeds the ECV in table 1 to this section that corresponds to the particular sampling device used.

(g)(1) Unless otherwise directed by the District Manager, upon issuance of a citation for a violation of the standard involving a DO in an MMU, paragraph (a)(1) of this section shall not apply to the DO in that MMU until the violation is abated and the citation is terminated in accordance with paragraphs (h) and (i) of this section.

(2) Unless otherwise directed by the District Manager, upon issuance of a citation for a violation of the standard involving a type of ODO in an MMU, paragraph (a)(2) of this section shall not apply to that ODO type in that MMU until the violation is abated and the citation is terminated in accordance with paragraphs (g) and (h) of this section.

(h) Upon issuance of a citation for violation of the standard, the operator shall take the following actions sequentially:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable coal mine dust to at or below the standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(4) Begin sampling, within 8 calendar days after the date the citation is issued, the environment of the affected occupation in the MMU on consecutive normal production shifts until five valid representative samples are taken.

(i) A citation for a violation of the standard shall be terminated by MSHA when:

(1) Each of the five valid representative samples is at or below the standard; and

(2) The operator has submitted to the District Manager revised dust control parameters as part of the mine ventilation plan applicable to the MMU in the citation and the changes have been approved by the District Manager. The revised parameters shall reflect the control measures used by the operator to abate the violation.

Table 1 to § 70.208—Excessive Concentration Values (ECV) Based on a Single Sample, Three Samples, or the Average of Five or Fifteen Full-Shift CMDPSU/CPDM Concentration Measurements

Section | Samples | ECV (mg/m 3)

CMDPSU | CPDM

70.208 (e) | 70.1-0(a)—Single sample | 1.79 | 1.70

70.1-0(b)—Single sample | 0.74 | 0.57

70.208(f)(1) | 70.1-0(a)—3 or more samples | 1.79 | 1.70

70.1-0(b)—3 or more samples | 0.74 | 0.57

70.208(f)(2) | 70.1-0(a)—5 sample average | 1.63 | 1.59

70.1-0(b)—5 sample average | 0.61 | 0.53

70.208(f)(2) | 70.1-0(a)—15 sample average | 1.58 | 1.56

70.1-0(b)—15 sample average | 0.57 | 0.52

70.208(i)(1) | 70.1-0(a)—Each of 5 samples | 1.79 | 1.70

70.1-0(b)—Each of 5 samples | 0.74 | 0.57

[89 FR 28474, 28475, Apr. 18, 2024]

§ 70.209 Quarterly sampling; designated areas.

As of April 14, 2025:

(a) The operator shall sample quarterly each designated area (DA) on consecutive production shifts until five valid representative samples are taken. The quarterly periods are:

(1) January 1-March 31

(2) April 1-June 30

(3) July 1-September 30

(4) October 1-December 31.

(b) [Reserved]

(c) When a valid representative sample taken in accordance with this section meets or exceeds the ECV in table 1 to this section that corresponds to the particular sampling device used, the operator shall:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable dust to at or below the respirable dust standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(d) Noncompliance with the standard is demonstrated during the sampling period when:

(1) Two or more valid representative samples meet or exceed the ECV in table 1 to this section that corresponds to the particular sampling device used; or

(2) The average for all valid representative samples meets or exceeds the ECV in table 1 to this section that corresponds to the particular sampling device used.

(e) Unless otherwise directed by the District Manager, upon issuance of a citation for a violation of the standard, paragraph (a) of this section shall not apply to that DA until the violation is abated and the citation is terminated in accordance with paragraphs (e) and (f) of this section.

(f) Upon issuance of a citation for a violation of the standard, the operator shall take the following actions sequentially:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable coal mine dust to at or below the standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(4) Begin sampling, within 8 calendar days after the date the citation is issued, the environment of the affected DA on consecutive normal production shifts until five valid representative samples are taken.

(g) A citation for a violation of the standard shall be terminated by MSHA when:

(1) Each of the five valid representative samples is at or below the standard; and

(2) The operator has submitted to the District Manager revised dust control parameters as part of the mine ventilation plan applicable to the DA in the citation, and the changes have been approved by the District Manager. The revised parameters shall reflect the control measures used by the operator to abate the violation.

Table 1 to § 70.209—Excessive Concentration Values (ECV) Based on a Single Sample, Two Samples, or the Average of Five or Fifteen Full-Shift CMDPSU/CPDM Concentration Measurements

Section | Samples | ECV (mg/m 3)

CMDPSU | CPDM

70.209 (c) | 70.100(a)—Single sample | 1.79 | 1.70

70.100(b)—Single sample | 0.74 | 0.57

70.209(d)(1) | 70.100(a)—2 or more samples | 1.79 | 1.70

70.100(b)—2 or more samples | 0.74 | 0.57

70.209(d)(2) | 70.100(a)—5 sample average | 1.63 | 1.59

70.100(b)—5 sample average | 0.61 | 0.53

70.209(d)(2) | 70.100(a)—15 sample average | 1.58 | 1.56

70.100(b)—15 sample average | 0.57 | 0.52

70.209(g)(1) | 70.100(a)—Each of 5 samples | 1.79 | 1.70

70.100(b)—Each of 5 samples | 0.74 | 0.57

[89 FR 28475, 28476, Apr. 18, 2024]

§ 70.210 Respirable dust samples; transmission by operator.

(a) If using a CMDPSU, the operator shall transmit within 24 hours after the end of the sampling shift all samples collected to fulfill the requirements of this part, including control filters, in containers provided by the manufacturer of the filter cassette to: Respirable Dust Processing Laboratory, Pittsburgh Safety and Health Technology Center, 626 Cochrans Mill Road, Building 38, Pittsburgh, PA 15236-3611, or to any other address designated by the District Manager.

(b) The operator shall not open or tamper with the seal of any filter cassette or alter the weight of any filter cassette before or after it is used to fulfill the requirements of this part.

(c) A person certified in sampling shall properly complete the dust data card that is provided by the manufacturer for each filter cassette. The card shall have an identification number identical to that on the cassette used to take the sample and be submitted to MSHA with the sample. Each card shall be signed by the certified person who actually performed the required examinations under 70.205(b) of this part during the sampling shift and shall include that person's MSHA Individual Identification Number (MIIN). Respirable dust samples with data cards not properly completed may be voided by MSHA.

(d) All respirable dust samples collected by the operator shall be considered taken to fulfill the sampling requirements of part 70, 71, or 90 of this title, unless the sample has been identified in writing by the operator to the District Manager, prior to the intended sampling shift, as a sample to be used for purposes other than required by part 70, 71, or 90 of this title.

(e) Respirable dust samples received by MSHA in excess of those required by this part shall be considered invalid samples.

(f) If using a CPDM, the person certified in sampling shall (1) validate, certify, and transmit electronically to MSHA within 24 hours after the end of each sampling shift all sample data file information collected and stored in the CPDM, including the sampling status conditions encountered when sampling; and (2) not tamper with the CPDM or its components in any way before, during, or after it is used to fulfill the requirements of this part, or alter any sample data files. All CPDM data files transmitted electronically to MSHA shall be maintained by the operator for at least 12 months.

[79 FR 24974, May 1, 2014, as amended at 80 FR 52989, Sept. 2, 2015]

§ 70.211 Respirable dust samples; report to operator; posting.

(a) MSHA shall provide the operator, as soon as practicable, a report with the following data on respirable dust samples submitted or whose results were transmitted electronically, if using a CPDM, in accordance with this part:

(1) The mine identification number;

(2) The locations within the mine from which the samples were taken;

(3) The concentration of respirable dust, expressed as an equivalent concentration for each valid sample;

(4) The average equivalent concentration of respirable dust for all valid samples;

(5) The occupation code, where applicable; and

(6) The reason for voiding any sample.

(b) Upon receipt, the operator shall post this data for at least 31 days on the mine bulletin board.

(c) If using a CPDM, the person certified in sampling shall, within 12 hours after the end of each sampling shift, print, sign, and post on the mine bulletin board a paper record (Dust Data Card) of the sample run. This hard-copy record shall include the data entered when the sample run was first programmed, and the following:

(1) The mine identification number;

(2) The locations within the mine from which the samples were taken;

(3) The concentration of respirable dust, expressed as an equivalent concentration reported and stored for each sample;

(4) The sampling status conditions encountered for each sample; and

(5) The shift length.

(d) The information required by paragraph (c) of this section shall remain posted until receipt of the MSHA report covering these respirable dust samples.

§ 70.212 Status change reports.

(a) If there is a change in operational status that affects the respirable dust sampling requirements of this part, the operator shall report the change in operational status of the mine, mechanized mining unit, or designated area to the MSHA District Office or to any other MSHA office designated by the District Manager. Status changes shall be reported in writing or electronically within 3 working days after the status change has occurred.

(b) Each specific operational status is defined as follows:

(1) Underground mine:

(i) Producing—has at least one MMU unit producing material.

(ii) Nonproducing—no material is being produced.

(iii) Abandoned—the work of all miners has been terminated and production activity has ceased.

(2) MMU:

(i) Producing—producing material from a working section.

(ii) Nonproducing—temporarily ceased production of material.

(iii) Abandoned—permanently ceased production of material.

(3) DA:

(i) Producing—activity is occurring.

(ii) Nonproducing—activity has ceased.

(iii) Abandoned—the dust generating source has been withdrawn and activity has ceased.

D Subpart D [Reserved]
Subpart E Dust From Drilling Rock [Reserved]
F Subparts F-S [Reserved]
Subpart T Diesel Exhaust Gas Monitoring
§ 70.1900 Exhaust Gas Monitoring.

(a) During on-shift examinations required by § 75.362, a certified person as defined by § 75.100 of this chapter and designated by the operator as trained or experienced in the appropriate sampling procedures, shall determine the concentration of carbon monoxide (CO) and nitrogen dioxide (NO2):

(1) In the return of each working section where diesel equipment is used, at a location which represents the contribution of all diesel equipment on such section;

(2) In the area of the section loading point if diesel haulage equipment is operated on the working section;

(3) At a point inby the last piece of diesel equipment on the longwall or shortwall face when mining equipment is being installed or removed; and

(4) In any other area designated by the district manager as specified in the mine operator's approved ventilation plan where diesel equipment is operated in a manner which can result in significant concentrations of diesel exhaust.

(b) Samples of CO and NO2 shall be—

(1) Collected in a manner that makes the results available immediately to the person collecting the samples;

(2) Collected and analyzed by appropriate instrumentation which has been maintained and calibrated in accordance with the manufacturer's recommendations; and

(3) Collected during periods that are representative of conditions during normal operations.

(c) Except as provided in § 75.325(j) of this chapter, when sampling results indicate a concentration of CO and/or NO2 exceeding an action level of 50 percent of the threshold limit values (TLV®) adopted by the American Conference of Governmental Industrial Hygienists, the mine operator shall immediately take appropriate corrective action to reduce the concentrations of CO and/or NO2 to below the applicable action level. The publication, “Threshold Limit Values for Substance in Workroom Air” (1972) is incorporated by reference and may be inspected at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; at any MSHA Coal Mine Safety and Health District Office; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. In addition, copies of the document may be purchased from the American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Attn: Customer Service, Cincinnati, OH 45240; 513-742-2020; http://www.acgih.org.

(d) A record shall be made when sampling results exceed the action level for the applicable TLV ® for CO and/or NO2. The record shall be made as part of and in the same manner as the records for hazards required by § 75.363 of this chapter and include the following:

(1) Location where each sample was collected;

(2) Substance sampled and the measured concentration; and

(3) Corrective action taken to reduce the concentration of CO and/or NO2 to or below the applicable action level.

(e) As of November 25, 1997 exhaust gas monitoring shall be conducted in accordance with the requirements of this section.

[61 FR 55526, Oct. 25, 1996, as amended at 67 FR 38385, June 4, 2002; 71 FR 16667, Apr. 3, 2006; 80 FR 52989, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

PART 71 MANDATORY HEALTH STANDARDS—SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES

Authority: 30 U.S.C. 811, 813(h), 957.

Source: 37 FR 6368, Mar. 28, 1972, unless otherwise noted.

Subpart A General

Source: 79 FR 24980, May 1, 2014, unless otherwise noted.

§ 71.1 Scope.

This part 71 sets forth mandatory health standards for each surface coal mine and for the surface work areas of each underground coal mine subject to the Federal Mine Safety and Health Act of 1977, as amended.

§ 71.2 Definitions.

The following definitions apply in this part.

Act. The Federal Mine Safety and Health Act of 1977, Public Law 91-173, as amended by Public Law 95-164 and Public Law 109-236.

Active workings. Any place in a surface coal mine or the surface work area of an underground coal mine where miners are normally required to work or travel.

Approved sampling device. A sampling device approved by the Secretary and Secretary of Health and Human Services (HHS) under part 74 of this title.

Certified person. An individual certified by the Secretary in accordance with § 71.202 to take respirable dust samples required by this part or certified in accordance with § 71.203 to perform maintenance and calibration of respirable dust sampling equipment as required by this part.

Coal mine dust personal sampler unit (CMDPSU). A personal sampling device approved under part 74, subpart B, of this title.

Concentration. A measure of the amount of a substance contained per unit volume of air.

Continuous personal dust monitor (CPDM). A personal sampling device approved under part 74, subpart C, of this title.

Designated work position (DWP). A work position in a surface coal mine and surface work area of an underground coal mine designated for sampling to measure respirable dust generation sources in the active workings. Each DWP will be assigned a four-digit number assigned by MSHA identifying the specific physical portion of the mine that is affected, followed by a three-digit MSHA coal mining occupation code describing the location to which a miner is assigned in the performance of his or her regular duties.

District Manager. The manager of the Coal Mine Safety and Health District in which the mine is located.

Equivalent concentration. The concentration of respirable coal mine dust, including quartz, expressed in milligrams per cubic meter of air (mg/m 3) as measured with an approved sampling device, determined by dividing the weight of dust in milligrams collected on the filter of an approved sampling device by the volume of air in cubic meters passing through the filter (sampling time in minutes (t) times the sampling airflow rate in cubic meters per minute), and then converting that concentration to an equivalent concentration as measured by the Mining Research Establishment (MRE) instrument. When the approved sampling device is:

(1) The CMDPSU, the equivalent concentration is determined by multiplying the concentration of respirable coal mine dust by the constant factor prescribed by the Secretary.

(2) The CPDM, the device shall be programmed to automatically report end-of-shift concentration measurements as equivalent concentrations.

MRE instrument. The gravimetric dust sampler with a four channel horizontal elutriator developed by the Mining Research Establishment of the National Coal Board, London, England.

MSHA. The Mine Safety and Health Administration of the U.S. Department of Labor.

Normal work shift. (1) A shift during which the regular duties of the DWP are performed while routine day-to-day mining activities are occurring in the rest of the mine and

(2) A shift during which there is no rain, or, if rain occurs, the rain does not suppress the respirable dust to the extent that sampling results will be measurably lower, in the judgment of the person certified under this part to conduct sampling.

Representative sample. A respirable dust sample, expressed as an equivalent concentration, that reflects typical dust concentration levels in the working environment of the DWP when performing normal duties.

Respirable dust. Dust collected with a sampling device approved by the Secretary and the Secretary of HHS in accordance with part 74 (Coal Mine Dust Sampling Devices) of this title.

Secretary. The Secretary of Labor or a delegate.

Surface area. A specific physical portion of a surface coal mine or surface area of an underground coal mine. These areas are assigned a four-digit identification number by MSHA.

Surface coal mine. A surface area of land and all structures, facilities, machinery, tools, equipment, excavations, and other property, real or personal, placed upon or above the surface of such land by any person, used in, or to be used in, or resulting from, the work of extracting in such area bituminous coal, lignite, or anthracite from its natural deposits in the earth by any means or method, and the work of preparing the coal so extracted, including custom coal preparation facilities.

Surface installation. Any structure in which miners work at a surface coal mine or surface work area of an underground coal mine.

Surface work area of an underground mine. The surface areas of land and all structures, facilities, machinery, tools, equipment, shafts, slopes, excavations, and other property, real or personal, placed in, upon or above the surface of such land by any person, used in, or to be used in, or resulting from, the work of extracting bituminous coal, lignite, or anthracite from its natural deposits underground by any means or method, and the work of preparing the coal so extracted, including custom coal preparation facilities.

Surface worksite. Any area in which miners work at a surface coal mine or surface work area of an underground coal mine.

Valid respirable dust sample. A respirable dust sample collected and submitted as required by this part, including any sample for which the data were electronically transmitted to MSHA, and not voided by MSHA.

Work position. An occupation identified by an MSHA three-digit code number describing a location to which a miner is assigned in the performance of his or her normal duties.

[79 FR 24980, May 1, 2014, as amended at 89 FR 28476, Apr. 18, 2024]

Subpart B Dust Standards

Source: 79 FR 24981, May 1, 2014, unless otherwise noted.

§ 71.100 Respirable dust standard.

Each operator shall continuously maintain the average concentration of respirable dust in the mine atmosphere during each shift to which each miner in the active workings of each mine is exposed, as measured with an approved sampling device and expressed in terms of an equivalent concentration, at or below:

(a) 2.0 milligrams of respirable dust per cubic meter of air (mg/m 3).

(b) 1.5 mg/m 3 as of August 1, 2016.

§ 71.101 [Reserved]
Subpart C Sampling Procedures

Source: 79 FR 24982, May 1, 2014, unless otherwise noted.

§ 71.201 Sampling; general and technical requirements.

(a) Each operator shall take representative samples of the concentration of respirable dust in the active workings of the mine as required by this part only with an approved CMDPSU. On February 1, 2016, the operator may use an approved CPDM if the operator notifies the District Manager in writing that only an approved CPDM will be used for all DWP sampling at the mine. The notification must be received at least 90 days before the beginning of the quarter in which CPDMs will be used to collect the DWP samples.

(b) Sampling devices shall be worn or carried directly to and from the DWP to be sampled. Sampling devices shall remain with the DWP and shall be operational during the entire shift, which includes the total time spent in the DWP and while traveling to and from the DWP being sampled. If the work shift to be sampled is longer than 12 hours and the sampling device is:

(1) A CMDPSU, the operator shall switch-out the unit's sampling pump prior to the 13th-hour of operation.

(2) A CPDM, the operator shall switch-out the CPDM with a fully charged device prior to the 13th-hour of operation.

(c) If using a CMDPSU, one control filter shall be used for each shift of sampling. Each control filter shall:

(1) Have the same pre-weight data (noted on the dust data card) as the filters used for sampling;

(2) Remain plugged at all times;

(3) Be used for the same amount of time, and exposed to the same temperature and handling conditions as the filters used for sampling; and

(4) Be kept with the exposed samples after sampling and in the same mailing container when transmitted to MSHA.

(d) Records showing the length of each normal work shift for each DWP shall be made and retained for at least six months and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners, and submitted to the District Manager when requested in writing.

(e) Upon request from the District Manager, the operator shall submit the date and time any respirable dust sampling required by this part will begin. This information shall be submitted at least 48 hours prior to scheduled sampling.

(f) Upon written request by the operator, the District Manager may waive the rain restriction for a normal work shift as defined in § 71.2 for a period not to exceed two months, if the District Manager determines that:

(1) The operator will not have reasonable opportunity to complete the respirable dust sampling required by this part without the waiver because of the frequency of rain; and

(2) The operator did not have reasonable opportunity to complete the respirable dust sampling required by this part prior to requesting the waiver.

(g) Operators using CPDMs shall provide training to all miners expected to wear the CPDM. The training shall be completed prior to a miner wearing the CPDM and then every 12 months thereafter. The training shall include:

(1) The importance of monitoring dust concentrations and properly wearing the CPDM;

(2) Explaining the basic features and capabilities of the CPDM;

(3) Discussing the various types of information displayed by the CPDM and how to access that information; and

(4) How to start and stop a short-term sample run during compliance sampling.

(h) An operator shall keep a record of the CPDM training at the mine site for 24 months after completion of the training. An operator may keep the record elsewhere if the record is immediately accessible from the mine site by electronic transmission. Upon request from an authorized representative of the Secretary, Secretary of HHS, or representative of miners, the operator shall promptly provide access to any such training records. The record shall include:

(1) The date of training;

(2) The names of miners trained; and

(3) The subjects included in the training.

§ 71.202 Certified person; sampling.

(a) The respirable dust sampling required by this part shall be performed by a certified person.

(b) To be certified, a person shall complete the applicable MSHA course of instruction and pass the MSHA examination demonstrating competency in sampling procedures. Persons not certified in sampling, and those certified only in maintenance and calibration procedures in accordance with § 71.203(b), are not permitted to collect respirable dust samples required by this part or handle approved sampling devices when being used in sampling.

(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in sampling procedures every three years.

(d) MSHA may revoke a person's certification for failing to properly carry out the required sampling procedures.

§ 71.203 Certified person; maintenance and calibration.

(a) Approved sampling devices shall be maintained and calibrated by a certified person.

(b) To be certified, a person shall complete the applicable MSHA course of instruction and pass the MSHA examination demonstrating competency in maintenance and calibration procedures for approved sampling devices. Necessary maintenance of the sampling head assembly of a CMDPSU, or the cyclone assembly of a CPDM, can be performed by persons certified in sampling or maintenance and calibration.

(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in maintenance and calibration procedures every three years.

(d) MSHA may revoke a person's certification for failing to properly carry out the required maintenance and calibration procedures.

§ 71.204 Approved sampling devices; maintenance and calibration.

(a) Approved sampling devices shall be maintained as approved under part 74 of this chapter and calibrated in accordance with MSHA Informational Report IR 1240 (1996) “Calibration and Maintenance Procedures for Coal Mine Respirable Dust Samplers” or in accordance with the manufacturer's recommendations if using a CPDM. Only persons certified in maintenance and calibration can perform maintenance work on the CPDM or on the pump unit of the CMDPSU.

(b) Sampling devices shall be calibrated at the flowrate of 2.0 liters of air per minute (L/min) if using a CMDPSU, or at 2.2 L/min if using a CPDM, or at a different flowrate recommended by the manufacturer, before they are put into service and, thereafter, at time intervals recommended by the manufacturer or prescribed by the Secretary or Secretary of HHS.

(c) If using a CMDPSU, sampling devices shall be examined and tested by a person certified in sampling or in maintenance and calibration within 3 hours before the start of the shift on which the approved sampling devices will be used to collect respirable dust samples. This is to assure that the sampling devices are clean and in proper working condition. This examination and testing shall include the following:

(1) Examination of all components of the cyclone assembly to assure that they are clean and free of dust and dirt. This includes examining the interior of the connector barrel (located between the cassette assembly and vortex finder), vortex finder, cyclone body, and grit pot;

(2) Examination of the inner surface of the cyclone body to assure that it is free of scoring or scratch marks on the inner surface of the cyclone where the air flow is directed by the vortex finder into the cyclone body;

(3) Examination of the external hose connecting the pump unit to the sampling head assembly to assure that it is clean and free of leaks; and

(4) Examination of the clamping and positioning of the cyclone body, vortex finder, and cassette to assure that they are rigid, in alignment, firmly in contact, and airtight.

(5) Testing the voltage of each battery while under actual load to assure the battery is fully charged. This requires that a fully assembled and examined sampling head assembly be attached to the pump inlet with the pump unit running when the voltage check is made. The voltage for the batteries used in the CMDPSU shall not be lower than the product of the number of cells in the battery multiplied by the manufacturer's nominal voltage per cell value.

(d) If using a CPDM, the certified person in sampling or in maintenance and calibration shall:

(1) Follow the pre-operational examinations, testing, and set-up procedures, and perform necessary external maintenance recommended by the manufacturer to assure the operational readiness of the CPDM within 3 hours before the start of the shift on which the sampling devices will be used to collect respirable dust samples; and

(2) Perform other required scheduled examinations and maintenance procedures recommended by the manufacturer.

(e) You must proceed in accordance with “Calibration and Maintenance Procedures for Coal Mine Respirable Dust Samplers,” MSHA Informational Report IR 1240 (1996), referenced in paragraph (a) of this section. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may obtain a copy from the MSHA Web site at http://www.msha.gov and you may inspect or obtain a copy at MSHA, Coal Mine Safety and Health, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9500; and at each MSHA Coal Mine Safety and Health District Office, or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

[79 FR 24982, May 1, 2014, as amended at 80 FR 52989, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 71.205 Approved sampling devices; operation; air flowrate.

As of April 14, 2025:

(a) Approved sampling devices shall be operated at the flowrate of 2.0 L/min, if using a CMDPSU; at 2.2 L/min, if using a CPDM; or at a different flowrate recommended by the manufacturer.

(b) If using a CMDPSU, each sampling device shall be examined each shift by a person certified in sampling during:

(1) The second hour after being put into operation to assure it is in the proper location, operating properly, and at the proper flowrate. If the proper flowrate is not maintained, necessary adjustments shall be made by the certified person.

(2) The last hour of operation to assure that it is operating properly and at the proper flowrate. If the proper flowrate is not maintained, the respirable dust sample shall be transmitted to MSHA with a notation by the certified person on the back of the dust data card stating that the proper flowrate was not maintained. Other events occurring during the collection of respirable dust samples that may affect the validity of the sample, such as dropping of the sampling head assembly onto the mine floor, shall be noted on the back of the dust data card.

(c) If using a CPDM, the person certified in sampling shall monitor the dust concentrations and the sampling status conditions being reported by the sampling device at mid-shift or more frequently as specified in the approved respirable dust control plan, if applicable, to assure: The sampling device is in the proper location and operating properly; and the work environment of the occupation being sampled remains in compliance with the standard at the end of the shift.

[89 FR 28476, 28477, Apr. 18, 2024]

§ 71.206 Quarterly sampling; designated work positions.

As of April 14, 2025:

(a) Each operator shall take one valid representative sample from the DWP during each quarterly period. The quarterly periods are:

(1) January 1-March 31

(2) April 1-June 30

(3) July 1-September 30

(4) October 1-December 31.

(b) [Reserved]

(c) Designated work position samples shall be collected at locations to measure respirable dust generation sources in the active workings. The specific work positions at each mine where DWP samples shall be collected include:

(1) Each highwall drill operator (MSHA occupation code 384);

(2) Bulldozer operators (MSHA occupation code 368); and

(3) Other work positions designated by the District Manager for sampling in accordance with § 71.206(m).

(d) Operators with multiple work positions specified in paragraphs (b)(2) and (3) of this section shall sample the DWP exposed to the greatest respirable dust concentration in each work position performing the same activity or task at the same location at the mine and exposed to the same dust generation source. Each operator shall provide the District Manager with a list identifying the specific work positions where DWP samples will be collected for:

(1) Active mines—by October 1, 2014.

(2) New mines—Within 30 calendar days of mine opening.

(3) DWPs with a change in operational status that increases or reduces the number of active DWPs—within 7 calendar days of the change in status.

(e) Each DWP sample shall be taken on a normal work shift. If a normal work shift is not achieved, the respirable dust sample shall be transmitted to MSHA with a notation by the person certified in sampling on the back of the dust data card stating that the sample was not taken on a normal work shift. When a normal work shift is not achieved, the sample for that shift may be voided by MSHA. However, any sample, regardless of whether a normal work shift was achieved, that exceeds the standard by at least 0.1 mg/m 3 shall be used in the determination of the equivalent concentration for that occupation.

(f) Unless otherwise directed by the District Manager, DWP samples shall be taken by placing the sampling device as follows:

(1) Equipment operator: On the equipment operator or on the equipment within 36 inches of the operator's normal working position.

(2) Non-equipment operators: On the miner assigned to the DWP or at a location that represents the maximum concentration of dust to which the miner is exposed.

(g) Upon notification from MSHA that any valid representative sample taken from a DWP to meet the requirements of paragraph (a) of this section exceeds the standard, the operator shall, within 15 calendar days of notification, sample that DWP each normal work shift until five valid representative samples are taken. The operator shall begin sampling on the first normal work shift following receipt of notification.

(h) When a valid representative sample taken in accordance with this section meets or exceeds the excessive concentration value (ECV) in table 1 to this section that corresponds to the particular sampling device used, the mine operator shall:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable coal mine dust to at or below the standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(i) Noncompliance with the standard is demonstrated during the sampling period when:

(1) Two or more valid representative samples meet or exceed the ECV in table 1 to this section that corresponds to the particular sampling device used; or

(2) The average for all valid representative samples meets or exceeds the ECV in table 1 to this section that corresponds to the particular sampling device used.

(j) Unless otherwise directed by the District Manager, upon issuance of a citation for a violation of the standard, paragraph (a) of this section shall not apply to that DWP until the violation is abated and the citation is terminated in accordance with paragraphs (j) and (k) of this section.

(k) Upon issuance of a citation for violation of the standard, the operator shall take the following actions sequentially:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable coal mine dust to at or below the standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(4) Begin sampling, within 8 calendar days after the date the citation is issued, the environment of the affected DWP on consecutive normal work shifts until five valid representative samples are taken.

(l) A citation for violation of the standard shall be terminated by MSHA when the equivalent concentration of each of the five valid representative samples is at or below the standard.

(m) The District Manager may designate for sampling under this section additional work positions at a surface coal mine and at a surface work area of an underground coal mine where a concentration of respirable dust exceeding 50 percent of the standard has been measured by one or more MSHA valid representative samples.

(n) The District Manager may withdraw from sampling any DWP designated for sampling under paragraph (m) of this section upon finding that the operator is able to maintain continuing compliance with the standard. This finding shall be based on the results of MSHA and operator valid representative samples taken during at least a 12-month period.

Table 1 to § 71.206—Excessive Concentration Values (ECV) Based on a Single Sample, Two Samples, or the Average of Five Full-Shift CMDPSU/CPDM Concentration Measurements

Section | Samples | ECV (mg/m 3)

CMDPSU | CPDM

71.206(h) | Single sample | 1.79 | 1.70

71.206(i)(1) | 2 or more samples | 1.79 | 1.70

71.206(i)(2) | 5 sample average | 1.63 | 1.59

71.206(l) | Each of 5 samples | 1.79 | 1.70

[89 FR 28477, 28478, Apr. 18, 2024]

§ 71.207 Respirable dust samples; transmission by operator.

(a) If using a CMDPSU, the operator shall transmit within 24 hours after the end of the sampling shift all samples collected to fulfill the requirements of this part, including control filters, in containers provided by the manufacturer of the filter cassette to: Respirable Dust Processing Laboratory, Pittsburgh Safety and Health Technology Center, 626 Cochrans Mill Road, Building 38, Pittsburgh, PA 15236-3611, or to any other address designated by the District Manager.

(b) The operator shall not open or tamper with the seal of any filter cassette or alter the weight of any filter cassette before or after it is used to fulfill the requirements of this part.

(c) A person certified in sampling shall properly complete the dust data card that is provided by the manufacturer for each filter cassette. The card shall have an identification number identical to that on the cassette used to take the sample and be submitted to MSHA with the sample. Each card shall be signed by the certified person who actually performed the required examinations under 71.205(b) of this part during the sampling shift and shall include that person's MSHA Individual Identification Number (MIIN). Respirable dust samples with data cards not properly completed may be voided by MSHA.

(d) All respirable dust samples collected by the operator shall be considered taken to fulfill the sampling requirements of part 70, 71, or 90 of this title, unless the sample has been identified in writing by the operator to the District Manager, prior to the intended sampling shift, as a sample to be used for purposes other than required by part 70, 71, or 90 of this title.

(e) Respirable dust samples received by MSHA in excess of those required by this part shall be considered invalid samples.

(f) If using a CPDM, the person certified in sampling shall (1) validate, certify, and transmit electronically to MSHA within 24 hours after the end of each sampling shift all sample data file information collected and stored in the CPDM, including the sampling status conditions encountered when sampling each DWP; and (2) not tamper with the CPDM or its components in any way before, during, or after it is used to fulfill the requirements of this part, or alter any sample data files. All CPDM data files transmitted electronically to MSHA shall be maintained by the operator for at least 12 months.

[79 FR 24982, May 1, 2014, as amended at 80 FR 52989, Sept. 2, 2015]

§ 71.208 Respirable dust samples; report to operator; posting.

(a) MSHA shall provide the operator, as soon as practicable, a report with the following data on respirable dust samples submitted or whose results were transmitted electronically, if using a CPDM, in accordance with this part:

(1) The mine identification number;

(2) The DWP at the mine from which the samples were taken;

(3) The concentration of respirable dust, expressed as an equivalent concentration for each valid sample;

(4) The average equivalent concentration of respirable dust for all valid samples;

(5) The occupation code; and

(6) The reason for voiding any sample.

(b) Upon receipt, the operator shall post this data for at least 31 days on the mine bulletin board.

(c) If using a CPDM, the person certified in sampling shall, within 12 hours after the end of each sampling shift, print, sign, and post on the mine bulletin board a paper record (Dust Data Card) of each sample run. This hard-copy record shall include the data entered when the sample run was first programmed, and the following:

(1) The mine identification number;

(2) The DWP at the mine from which the samples were taken;

(3) The concentration of respirable dust, expressed as an equivalent concentration reported and stored for each sample;

(4) The sampling status conditions encountered for each sample; and

(5) The shift length.

(d) The information required by paragraph (c) of this section shall remain posted until receipt of the MSHA report covering these respirable dust samples.

§ 71.209 Status change reports.

(a) If there is a change in operational status that affects the respirable dust sampling requirements of this part, the operator shall report the change in operational status of the mine or DWP to the MSHA District Office or to any other MSHA office designated by the District Manager. Status changes shall be reported in writing or electronically within 3 working days after the status change has occurred.

(b) Each specific operational status is defined as follows:

(1) Underground mine:

(i) Producing—has at least one mechanized mining unit producing material.

(ii) Nonproducing—no material is being produced.

(iii) Abandoned—the work of all miners has been terminated and production activity has ceased.

(2) Surface mine:

(i) Producing—normal activity is occurring and coal is being produced or processed or other material or equipment is being handled or moved.

(ii) Nonproducing—normal activity is not occurring and coal is not being produced or processed, and other material or equipment is not being handled or moved.

(iii) Abandoned—the work of all miners has been terminated and all activity has ceased.

(3) DWP:

(i) Producing—normal activity is occurring.

(ii) Nonproducing—normal activity is not occurring.

(iii) Abandoned—the dust generating source has been withdrawn and activity has ceased.

Subpart D Respirable Dust Control Plans

Source: 79 FR 24985, May 1, 2014, unless otherwise noted.

§ 71.300 Respirable dust control plan; filing requirements.

As of April 14, 2025:

(a) Within 15 calendar days after the termination date of a citation for violation of the standard, the operator shall submit to the District Manager for approval a written respirable dust control plan applicable to the DWP identified in the citation. The respirable dust control plan and revisions thereof shall be suitable to the conditions and the mining system of the coal mine and shall be adequate to continuously maintain respirable dust to at or below the standard at the DWP identified in the citation.

(1) The mine operator shall notify the representative of miners at least 5 days prior to submission of a respirable dust control plan and any revision to a dust control plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification;

(2) A copy of the proposed respirable dust control plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and

(3) A copy of the proposed respirable dust control plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn, or denied.

(4) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the District Manager, in writing, for consideration during the review process. Upon request, a copy of these comments shall be provided to the operator by the District Manager.

(b) Each respirable dust control plan shall include at least the following:

(1) The mine identification number and DWP number assigned by MSHA, the operator's name, mine name, mine address, and mine telephone number and the name, address, and telephone number of the principal officer in charge of health and safety at the mine;

(2) The specific DWP at the mine to which the plan applies;

(3) A detailed description of the specific respirable dust control measures used to abate the violation of the respirable dust standard; and

(4) A detailed description of how each of the respirable dust control measures described in response to paragraph (b)(3) of this section will continue to be used by the operator, including at least the specific time, place and manner the control measures will be used.

[89 FR 28478, Apr. 18, 2024]

§ 71.301 Respirable dust control plan; approval by District Manager and posting.

As of April 8, 2026:

(a) The District Manager will approve respirable dust control plans on a mine-by-mine basis. When approving respirable dust control plans, the District Manager shall consider whether:

(1) The respirable dust control measures would be likely to maintain concentrations of respirable coal mine dust at or below the standard; and

(2) The operator's compliance with all provisions of the respirable dust control plan could be objectively ascertained by MSHA.

(b) MSHA may take respirable dust samples to determine whether the respirable dust control measures in the operator's plan effectively maintain concentrations of respirable coal mine dust at or below the applicable standard.

(c) The operator shall comply with all provisions of each respirable dust control plan upon notice from MSHA that the respirable dust control plan is approved.

(d) The approved respirable dust control plan and any revisions shall be:

(1) Provided upon request to the representative of miners by the operator following notification of approval;

(2) Made available for inspection by the representative of miners; and

(3) Posted on the mine bulletin board within 1 working day following notification of approval, and shall remain posted for the period that the plan is in effect.

(e) The operator may review respirable dust control plans and submit proposed revisions to such plans to the District Manager for approval.

[89 FR 28478, 28479, Apr. 18, 2024]

Subpart E Surface Bathing Facilities, Change Rooms, and Sanitary Flush Toilet Facilities at Surface Coal Mines
§ 71.400 Bathing facilities; change rooms; sanitary flush toilet facilities.

Each operator of a surface coal mine shall provide bathing facilities, clothing change rooms, and sanitary flush toilet facilities, as hereinafter prescribed, for the use of miners employed in the surface installations and at the surface worksites of such mine. (Note: Sanitary facilities at surface work areas of underground mines are subject to the provisions of § 75.1712 of this chapter et seq.)

§ 71.401 Location of facilities.

Bathhouses, change rooms, and sanitary flush toilet facilities shall be in a location convenient for the use of the miners. Where these facilities are designed to serve more than one mine, they shall be centrally located so as to be convenient for the use of all miners served by the facilities.

§ 71.402 Minimum requirements for bathing facilities, change rooms, and sanitary flush toilet facilities.

(a) All bathing facilities, change rooms, and sanitary flush toilet facilities shall be provided with adequate light, heat, and ventilation so as to maintain a comfortable air temperature and to minimize the accumulation of moisture and odors, and the facilities shall be maintained in a clean and sanitary condition.

(b) Bathing facilities, change rooms, and sanitary flush toilet facilities shall be constructed and equipped so as to comply with applicable State and local building codes. However, where no State or local building codes apply to these facilities, or where no State or local building codes exist, the facilities shall be constructed and equipped so as to meet the minimum construction requirements in the National Building Code (1967 edition) and the plumbing requirements in the National Plumbing Code (ASA A40.8-1955), which documents are hereby incorporated by reference and made a part hereof. These documents are available for examination at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at every MSHA Coal Mine Safety and Health District Office. Copies of the National Plumbing Code (ASA A40.8-1955) may be purchased from the American National Standards Institute, Inc., 25 W. 43rd Street, 4th Floor, New York, NY 10036; http://www.ansi.org.

(c) In addition to the minimum requirements specified in paragraphs (a) and (b) of this section, facilities maintained in accordance with § 71.400 shall include the following:

(1) Bathing facilities. (i) Showers shall be provided with both hot and cold water.

(ii) At least one shower head shall be provided where five or less miners use such showers.

(iii) Where five or more miners use such showers, sufficient showers shall be furnished to provide approximately one shower head for each five miners.

(iv) A suitable nonirritating cleansing agent shall be provided for use at each shower.

(2) Sanitary flush toilet facilities. (i) At least one sanitary flush toilet shall be provided where 10 or less miners use such toilet facilities.

(ii) Where 10 or more miners use such toilet facilities, sufficient flush toilets shall be furnished to provide approximately one sanitary flush toilet for each 10 miners.

(iii) Where 30 or more miners use toilet facilities, one urinal may be substituted for one flush toilet, however, where such substitutions are made they shall not reduce the number of toilets below a ratio of two flush toilets to one urinal.

(iv) An adequate supply of toilet paper shall be provided with each toilet.

(v) Adequate handwashing facilities or hand lavatories shall be provided in or adjacent to each toilet facility.

(3) Change rooms. (i) Individual clothes storage containers or lockers shall be provided for storage of miners' clothing and other incidental personal belongings during and between shifts.

(ii) Change rooms shall be provided with sample space to permit the use of such facilities by all miners changing clothes prior to and after each shift.

[37 FR 6368, Mar. 28, 1972, as amended at 43 FR 12319, Mar. 24, 1978; 67 FR 38385, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 80 FR 52989, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 71.403 Waiver of surface facilities requirements; posting of waiver.

(a) The Coal Mine Health and Safety District Manager for the district in which the mine is located, after consultation with the appropriate Regional Program Director, National Institute for Occupational Safety and Health, may, upon written application by the operator, and after consideration of any comments filed within 30 days after receipt of the application, waive any or all of the requirements for §§ 71.400 through 71.402 for a period not to exceed 1 year if he determines that—

(1) The operator is providing or making available, under arrangements with one or more third parties, facilities which are at least equivalent to those required by the standards, or

(2) It is impractical for the operator to meet the requirement(s) or provide the facility (facilities) for which the waiver is sought.

(b) The waiver shall be in writing and shall set forth the requirement(s) which the operator will not be required to meet or the facilities which the operator will not be required to provide and the specific reason or reasons for such waiver.

(c) Upon receipt of any waiver, the operator shall post a copy of the waiver for at least 30 days on the mine bulletin board required by section 107(a) of the Act.

(d) An extension of the waiver at the end of 1 year may be sought by the operator by filing an application pursuant to § 71.404 no later than 30 days nor more than 60 days prior to the expiration date of the waiver.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[37 FR 6368, Mar. 28, 1972, as amended at 47 FR 14696, Apr. 6, 1982; 60 FR 33723, June 29, 1995]

§ 71.404 Application for waiver of surface facilities requirements.

(a) Application for waivers of any requirements of §§ 71.400 through 71.402 shall be in writing, filed with the appropriate Coal Mine Health and Safety District Manager, and shall contain the following information:

(1) The name and address of the mine operator,

(2) The name and location of the mine, and

(3) A detailed statement of the grounds upon which the waiver is requested and the period of time for which it is requested.

(b) At the same time the application is sent to the District Manager, a copy of the application shall be forwarded to the appropriate Regional Program Director, National Institute for Occupational Safety and Health by the operator, and a copy showing the addresses of the appropriate District Manager and Regional Program Director shall be posted by the operator for at least 30 days on the mine bulletin board required by section 107(a) of the Act.

Subpart F Sanitary Toilet Facilities at Surface Worksites of Surface Coal Mines
§ 71.500 Sanitary toilet facilities at surface work sites; installation requirements.

(a) Each operator of a surface coal mine shall provide and install at least one sanitary toilet in a location convenient to each surface work site. A single sanitary toilet may serve two or more surface work sites in the same surface mine where the sanitary toilet is convenient to each such work site.

(b) Where 10 or more miners use such toilet facilities, sufficient toilets shall be furnished to provide approximately one sanitary toilet for each 10 miners.

(c) Sanitary toilets shall have an attached toilet seat with a hinged lid and a toilet paper holder together with an adequate supply of toilet tissue.

(d) Only flush or nonflush chemical or biological toilets, combustion or incinerating toilets, sealed bag toilets, and vault toilets meet the requirements of this section. Privies are prohibited.

Note to paragraph (d):

Sanitary toilet facilities for surface work areas of underground mines are subject to the provisions of § 75.1712-3 of this chapter.)

[68 FR 37087, June 23, 2003]

§ 71.501 Sanitary toilet facilities; maintenance.

Sanitary toilets provided in accordance with the provisions of § 71.500 shall be regularly maintained in a clean and sanitary condition. Holding tanks shall be serviced and cleaned when full and in no case less than once each week when in use by draining or pumping or by removing them for cleaning and recharging. Transfer tanks and transfer equipment, if used, shall be equipped with suitable fittings to permit complete draining without spillage and allow for the sanitary transportation of wastes. Waste shall be disposed of in accordance with State and local laws and regulations.

Subpart G Drinking Water
§ 71.600 Drinking water; general.

An adequate supply of potable water shall be provided for drinking purposes in each surface installation and at each surface worksite of the mine.

§ 71.601 Drinking water; quality.

(a) Potable water provided in accordance with the provisions of § 71.600 shall meet the applicable minimum health requirements for drinking water established by the State or community in which the mine is located.

(b) Where no such requirements are applicable, the drinking water provided shall conform to the Public Health Service Drinking Water Standards, 42 CFR part 72, subpart J.

§ 71.602 Drinking water; distribution.

(a) Water shall be piped or transported in sanitary containers. Water systems and appurtenances thereto shall be constructed and maintained in accordance with State and local requirements. Where no such requirements are applicable, water systems and appurtenances shall be constructed and maintained in accordance with the National Plumbing Code (ASA A40.8—1955) which is hereby incorporated by reference and made a part hereof. (For information as to the availability of this code, see § 71.402(b).)

(b) Water transported to the site shall be carried, stored and otherwise protected in sanitary containers constructed of smooth, impervious, heavy gauge, corrosion resistant materials. The containers shall be marked with the words “Drinking Water.”

§ 71.603 Drinking water; dispensing requirements.

(a) Water shall be dispensed through a drinking fountain or from a water storage container with an adequate supply of single service cups stored in a clean, sanitary manner. Water shall not be dipped from inside water storage containers. Use of a common drinking cup is prohibited.

(b) Water containers shall remain sealed at all times during use and shall not be refilled with water for reuse without first being cleaned and disinfected with the use of heat or sanitizers.

(c) Drinking fountains from which water is dispensed shall be thoroughly cleaned once each week.

(d) Ice used for cooling drinking water shall not be immersed or in direct contact with the water to be cooled, unless it has been handled in a sanitary manner and unless the ice is made from the same source as the drinking water or from water of a quality equal to the source of the drinking water.

Subpart H Airborne Contaminants
§ 71.700 Inhalation hazards; threshold limit values for gases, dust, fumes, mists, and vapors.

(a) No operator of an underground coal mine and no operator of a surface coal mine may permit any person working at a surface installation or surface worksite to be exposed to airborne contaminants (other than respirable coal mine dust, respirable dust containing quartz, and asbestos dust) in excess of, on the basis of a time-weighted average, the threshold limit values adopted by the American Conference of Governmental Industrial Hygienists in “Threshold Limit Values of Airborne Contaminants” (1972), which is hereby incorporated by reference and made a part hereof. Excursions above the listed threshold limit values shall not be of greater magnitude than is characterized as permissible by the conference. This paragraph does not apply to airborne contaminants given a “C” designation by the conference in the document. This document is available for examination at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at every MSHA Coal Mine Safety and Health District Office. Copies of the document may be purchased from the American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Attn: Customer Service, Cincinnati, OH 45240; 513-742-2020; http://www.acgih.org.

(b) All persons, including employees, shall be withdrawn from any area in which there is a concentration of an airborne contaminant given a “C” designation by the Conference which exceeds the threshold limit value (ceiling “C” limit) listed for that contaminant.

[37 FR 6368, Mar. 28, 1972, as amended at 39 FR 17101, May 13, 1974; 43 FR 12319, Mar. 24, 1978. Redesignated at 45 FR 80756, Dec. 5, 1980, as amended at 67 FR 38385, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 80 FR 52990, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 71.701 Sampling; general requirements.

(a) Air samples will be taken by the Secretary and will be analyzed to determine the concentrations of noxious or poisonous gases, dusts, fumes, mists, and vapors in surface installations and at surface worksites.

(b) Upon written notification by the Secretary to the operator of an underground coal mine or of a surface coal mine, the operator shall conduct any additional air sampling tests and analyses as the Secretary may from time to time require in order to ensure compliance with the standards set forth in § 71.700 in each surface installation and at each surface worksite.

(c) Where concentrations of airborne contaminants in excess of the applicable threshold limit values, permissible exposure limits, or permissible excursions are known by the operator to exist in a surface installation or at a surface worksite, the operator shall immediately provide necessary control measures to assure compliance with § 71.700 or § 71.702, as applicable.

(d) Where the operator has reasonable grounds to believe that concentrations of airborne contaminants in excess of the applicable threshold limit values, permissible exposure limits, or permissible excursions exist, or are likely to exist, the operator shall promptly conduct appropriate air sampling tests to determine the concentration of any airborne contaminant which may be present and immediately provide the necessary control measures to assure compliance with § 71.700 or § 71.702, as applicable.

[37 FR 6368, Mar. 28, 1972. Redesignated at 45 FR 80756, Dec. 5, 1980; 73 FR 11304, Feb. 29, 2008]

§ 71.702 Asbestos standard.

(a) Definitions. Asbestos is a generic term for a number of asbestiform hydrated silicates that, when crushed or processed, separate into flexible fibers made up of fibrils.

Asbestos means chrysotile, cummingtonite-grunerite asbestos (amosite), crocidolite, anthophylite asbestos, tremolite asbestos, and actinolite asbestos.

Asbestos fiber means a fiber of asbestos that meets the criteria of a fiber.

Fiber means a particle longer than 5 micrometers (µm) with a length-to-diameter ratio of at least 3-to-1.

(b) Permissible Exposure Limits (PELs)—(1) Full-shift limit. A miner's personal exposure to asbestos shall not exceed an 8-hour time-weighted average full-shift airborne concentration of 0.1 fiber per cubic centimeter of air (f/cc).

(2) Excursion limit. No miner shall be exposed at any time to airborne concentrations of asbestos in excess of 1 fiber per cubic centimeter of air (f/cc) as averaged over a sampling period of 30 minutes.

(c) Measurement of airborne asbestos fiber concentration. Potential asbestos fiber concentration shall be determined by phase contrast microscopy (PCM) using the OSHA Reference Method in OSHA's asbestos standard found in 29 CFR 1910.1001, Appendix A, or a method at least equivalent to that method in identifying a potential asbestos exposure exceeding the 0.1 f/cc full-shift limit or the 1 f/cc excursion limit. When PCM results indicate a potential exposure exceeding the 0.1 f/cc full-shift limit or the 1 f/cc excursion limit, samples shall be further analyzed using transmission electron microscopy according to NIOSH Method 7402 or a method at least equivalent to that method.

[73 FR 11304, Feb. 29, 2008, as amended at 73 FR 66172, Nov. 7, 2008]

PART 72 HEALTH STANDARDS FOR COAL MINES

Authority: 30 U.S.C. 811, 813(h), 957.

Source: 59 FR 8327, Feb. 18, 1994, unless otherwise noted.

Subpart A General
§ 72.1 Scope.

The health standards in this part apply to all coal mines.

Subpart B Medical Surveillance

Source: 79 FR 24986, May 1, 2014, unless otherwise noted.

§ 72.100 Periodic examinations.

(a) Each operator of a coal mine shall provide to each miner periodic examinations including chest x-rays, spirometry, symptom assessment, and occupational history at a frequency specified in this section and at no cost to the miner.

(1) Each operator shall use facilities approved by the National Institute for Occupational Safety and Health (NIOSH) to provide examinations specified in paragraph (a) of this section.

(2) The results of examinations or tests made pursuant to this section shall be furnished only to the Secretary, Secretary of Health and Human Services (HHS), and at the request of the miner, to the miner's designated physician.

(b) Voluntary examinations. Each operator shall provide the opportunity to have the examinations specified in § 72.100(a) at least every 5 years to all miners employed at a coal mine. The examinations shall be available during a 6-month period that begins no less than 3.5 years and not more than 4.5 years from the end of the last 6-month period.

(c) Mandatory examinations. For each miner who begins work at a coal mine for the first time, the operator shall provide examinations specified in § 72.100(a) as follows:

(1) An initial examination no later than 30 days after beginning employment;

(2) A follow-up examination no later than 3 years after the initial examination in paragraph (c)(1); and

(3) A follow-up examination no later than 2 years after the examinations in paragraph (c)(2) if the chest x-ray shows evidence of pneumoconiosis or the spirometry examination indicates evidence of decreased lung function. For this purpose, evidential criteria will be defined by NIOSH.

(d) Each mine operator shall develop and submit for approval to NIOSH a plan in accordance with 42 CFR part 37 for providing miners with the examinations specified in § 72.100(a) and a roster specifying the name and current address of each miner covered by the plan.

(e) Each mine operator shall post on the mine bulletin board at all times the approved plan for providing the examinations specified in § 72.100(a).

C Subpart C [Reserved]
Subpart D Diesel Particulate Matter—Underground Areas of Underground Coal Mines

Source: 66 FR 5704, Jan. 19, 2001, unless otherwise noted.

§ 72.500 Emission limits for permissible diesel-powered equipment.

(a) [Reserved]

(b) Each piece of permissible diesel-powered equipment operated in an underground area of an underground coal mine must emit no more than 2.5 grams per hour of diesel particulate matter.

[91 FR 38283, June 25, 2026]

§ 72.501 Emission limits for nonpermissible heavy-duty diesel-powered equipment, generators and compressors.

(a)-(b) [Reserved]

(c) Each piece of nonpermissible heavy-duty diesel-powered equipment (as defined by § 75.1908(a)), generator or compressor operated in an underground area of an underground coal mine must emit no more than 2.5 grams per hour of diesel particulate matter.

(d) Notwithstanding the other provisions of this section, a generator or compressor that discharges its exhaust directly into intake air that is coursed directly to a return air course, or discharges its exhaust directly into a return air course, is not subject to the applicable requirements of this section.

[66 FR 5704, Jan. 19, 2001, as amended at 66 FR 15033, Mar. 15, 2001; 66 FR 27866, May 21, 2001; 91 FR 38283, June 25, 2026]

§ 72.502 Requirements for nonpermissible light-duty diesel-powered equipment other than generators and compressors.

(a) Each piece of nonpermissible light-duty diesel-powered equipment (as defined by § 75.1908(b) of this chapter), other than generators and compressors, introduced into an underground area of an underground coal mine after May 21, 2001 must emit no more than 5.0 grams per hour of diesel particulate matter.

(b) A piece of nonpermissible light-duty diesel-powered equipment must be deemed to be in compliance with the requirements of paragraph (a) of this section if it utilizes an engine which meets or exceeds the applicable particulate matter emission requirements of the Environmental Protection Administration listed in Table 72.502-1, as follows:

Table 72.502-1

EPA requirement | EPA category | PM limit

40 CFR 86.094-8(a)(1)(I)(A)(2) | light duty vehicle | 0.1 g/mile.

40 CFR 86.094-9(a)(1)(I)(A)(2) | light duty truck | 0.1 g/mile.

40 CFR 86.094-11(a)(1)(iv)(B) | heavy duty highway engine | 0.1 g/bhp-hr.

40 CFR 89.112(a) | Tier 2 nonroad | Varies by power:

kW<(hp<11) | 0.80 g/kW-hr (0.60 g/bhp-hr).

8≤kW<19 (11≤hp<25) | 0.80 g/kW-hr (0.60 g/bhp-hr).

19≤kW<37 (25≤hp<50) | 0.60 g/kW-hr (0.45 g/bhp-hr).

37≤kW<75 (50≤hp<100) | 0.40 g/kW-hr (0.30 g/bhp-hr).

75≤kW<130 (100≤hp<175) | 0.30 g/kW-hr (0.22 g/bhp-hr).

130≤kW<225 (175≤hp<300) | 0.20 g/kW-hr (0.15 g/bhp-hr).

225≤kW<450 (300≤hp<600) | 0.20 g/kW-hr (0.15 g/bhp-hr).

450≤kW<560 (600≤hp<750)” | 0.20 g/kW-hr (0.15 g/bhp-hr)

kW≥560 (hp≥750) | 0.20 g/kW-hr (0.15 g/bhp-hr)

Notes: “g” means grams; “kW” means kilowatt; “hp” means horsepower; “g/kW-hr” means grams/kilowatt-hour; “g/bhp-hr” means grams/brake horsepower-hour.

(c) The requirements of this section do not apply to any diesel-powered ambulance or fire fighting equipment that is being used in accordance with the mine fire fighting and evacuation plan under § 75.1502.

[66 FR 5704, Jan. 19, 2001, as amended at 66 FR 15033, Mar. 15, 2001; 66 FR 27866, May 21, 2001; 70 FR 36347, June 23, 2005]

§ 72.503 Determination of emissions; filter maintenance; definition of “introduced”.

(a) MSHA will determine compliance with the emission requirements established by this part by using the amount of diesel particulate matter emitted by a particular engine determined from the engine approval pursuant to § 7.89(a)(9)(iii)(B) or § 7.89(a)(9)(iv)(A) of this title, with the exception of engines deemed to be in compliance by meeting the EPA requirements specified in Table 72.502-1 (§ 72.502(b)).

(b) Except as provided in paragraph (c) of this section, the amount by which an aftertreatment device can reduce engine emissions of diesel particulate matter as determined pursuant to paragraph (a) must be established by a laboratory test:

(1) on an approved engine which MSHA has determined, pursuant to paragraph (a) of this section, to emit no more diesel particulate matter than the engine being used in the piece of diesel-powered equipment in question;

(2) using the test cycle specified in Table E-3 of § 7.89 of this title, and following a test procedure appropriate for the filtration system, by a laboratory capable of testing engines in accordance with the requirements of Subpart E of part 7 of this title; and

(3) with an aftertreatment device representative of that being used on the piece of diesel-powered equipment in question.

(c) In lieu of the laboratory tests required by paragraph (b), the Secretary may accept the results of tests conducted or certified by an organization whose testing standards are deemed by the Secretary to be as rigorous as those set forth by paragraph (b) of this section; and further, the Secretary may accept the results of tests for one aftertreatment device as evidencing the efficiency of another aftertreatment device which the Secretary determines to be essentially identical to the one tested.

(d) Operators must maintain in accordance with manufacturer specifications and free of observable defects, any aftertreatment device installed on a piece of diesel equipment upon which the operator relies to remove diesel particulate matter from diesel emissions.

(e) For purposes of § 72.502(a), the term “introduced” means any piece of equipment whose engine is a new addition to the underground inventory of engines of the mine in question, including newly purchased equipment, used equipment, and equipment receiving a replacement engine that has a different serial number than the engine it is replacing. “Introduced” does not include a piece of equipment whose engine was previously part of the mine inventory and rebuilt.

[66 FR 5704, Jan. 19, 2001, as amended at 91 FR 38283, June 25, 2026]

§ 72.510 Miner health training.

(a) Operators must provide annual training to all miners at a mine who can reasonably be expected to be exposed to diesel emissions on that property. The training must include—

(1) The health risks associated with exposure to diesel particulate matter;

(2) The methods used in the mine to control diesel particulate matter concentrations;

(3) Identification of the personnel responsible for maintaining those controls; and

(4) Actions miners must take to ensure the controls operate as intended.

(b)(1) An operator must keep a record of the training at the mine site for one year after completion of the training. An operator may keep the record elsewhere if the record is immediately accessible from the mine site by electronic transmission.

(2) Upon request from an authorized representative of the Secretary of Labor, the Secretary of Health and Human Services, or from the authorized representative of miners, mine operators must promptly provide access to any such training record. Whenever an operator ceases to do business, that operator must transfer the training records, or a copy, to any successor operator who must maintain them for the required period.

§ 72.520 Diesel equipment inventory.

(a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment used in the mine. The inventory shall include the number and type of diesel-powered units used underground, including make and model of unit, type of equipment, make and model of engine, serial number of engine, brake horsepower rating of engine, emissions of engine in grams per hour or grams per brake horsepower-hour, approval number of engine, make and model of aftertreatment device, serial number of aftertreatment device if available, and efficiency of aftertreatment device.

(b) The mine operator shall make changes to the diesel equipment inventory as equipment or emission control systems are added, deleted or modified and submit revisions, to the District Manager, within 7 calendar days.

(c) If requested, the mine operator shall provide a copy of the diesel equipment inventory to the representative of the miners within 3 days of the request.

Subpart E Miscellaneous
§ 72.610 Abrasive blasting.

(a) Surface and underground mines. When an abrasive blasting operation is performed, all exposed miners shall properly use respirators approved for abrasive blasting by NIOSH under 42 CFR part 84, or the operation shall be performed in a totally enclosed device with the miner outside the device.

(b) Underground areas of underground mines. Silica sand or other materials containing more than 1 percent free silica shall not be used as an abrasive substance in abrasive blasting.

[59 FR 8327, Feb. 18, 1994, as amended at 60 FR 30401, June 8, 1995]

§ 72.620 Drill dust control at surface mines and surface areas of underground mines.

Holes shall be collared and drilled wet, or other effective dust control measures shall be used, when drilling non-water-soluble material. Effective dust control measures shall be used when drilling water-soluble material.

§ 72.630 Drill dust control at underground areas of underground mines.

(a) Dust resulting from drilling in rock shall be controlled by use of permissible dust collectors, or by water, or water with a wetting agent, or by ventilation, or by any other method or device approved by the Secretary that is as effective in controlling the dust.

(b) Dust collectors. Dust collectors shall be maintained in permissible and operating condition. Dust collectors approved under Part 33—Dust Collectors for Use in Connection with Rock Drilling in Coal Mines of this title or under Bureau of Mines Schedule 25B are permissible dust collectors for the purpose of this section.

(c) Water control. Water used to control dust from drilling rock shall be applied through a hollow drill steel or stem or by the flooding of vertical drill holes in the floor.

(d) Ventilation control. To adequately control dust from drilling rock, the air current shall be so directed that the dust is readily dispersed and carried away from the drill operator or any other miners in the area.

§ 72.700 Respiratory equipment; respirable dust.

(a) Respiratory equipment approved by NIOSH under 42 CFR part 84 shall be made available to all persons as required under parts 70, 71, and 90 of this chapter. Use of respirators shall not be substituted for environmental control measures in the active workings. Each operator shall maintain an adequate supply of respiratory equipment.

(b) When required to make respirators available, the operator shall provide training prior to the miner's next scheduled work shift, unless the miner received training within the previous 12 months on the types of respirators made available. The training shall include: The care, fit, use, and limitations of each type of respirator.

(c) An operator shall keep a record of the training at the mine site for 24 months after completion of the training. An operator may keep the record elsewhere if the record is immediately accessible from the mine site by electronic transmission. Upon request from an authorized representative of the Secretary, Secretary of HHS, or representative of miners, the operator shall promptly provide access to any such training records. The record shall include:

(1) The date of training;

(2) The names of miners trained; and

(3) The subjects included in the training.

[79 FR 24986, May 1, 2014]

§ 72.701 Respiratory equipment; gas, dusts, fumes, or mists.

Respiratory equipment approved by NIOSH under 42 CFR part 84 shall be provided to persons exposed for short periods to inhalation hazards from gas, dusts, fumes, or mists. When the exposure is for prolonged periods, other measures to protect such persons or to reduce the hazard shall be taken.

[79 FR 24986, May 1, 2014]

§ 72.710 Selection, fit, use, and maintenance of approved respirators.

As of April 14, 2025: Approved respirators shall be selected, fitted, used, and maintained in accordance with the provisions of a written respiratory protection program consistent with the requirements of ASTM F3387-19. ASTM F3387-19, Standard Practice for Respiratory Protection, approved August 1, 2019, is incorporated by reference into this section with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. This incorporation by reference (IBR) material is available for inspection at the Mine Safety and Health Administration (MSHA) and at the National Archives and Records Administration (NARA). Contact MSHA at: MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; (202) 693-9440; or any Mine Safety and Health Enforcement District Office. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email fr.inspection@nara.gov. The material may be obtained from ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; www.astm.org.

[89 FR 28479, Apr. 18, 2024, as amended at 91 FR 9448, Feb. 26, 2026]

§ 72.800 Single, full-shift measurement of respirable coal mine dust.

The Secretary will use a single, full-shift measurement of respirable coal mine dust to determine the average concentration on a shift since that measurement accurately represents atmospheric conditions to which a miner is exposed during such shift. As of April 14, 2025, noncompliance with the respirable dust standard, in accordance with this subchapter, is demonstrated when a single, full-shift measurement taken by MSHA meets or exceeds the applicable ECV in table 1 to § 70.208, table 1 to § 70.209, table 1 to § 71.206, or table 1 to § 90.207 of this chapter that corresponds to the particular sampling device used. Upon issuance of a citation for a violation of the standard, and for MSHA to terminate the citation, the mine operator shall take the specified actions in this subchapter.

[89 FR 28479, Apr. 18, 2024]

PART 74 COAL MINE DUST SAMPLING DEVICES

Authority: 30 U.S.C. 957.

Source: 75 FR 17523, Apr. 6, 2010, unless otherwise noted.

Subpart A General
§ 74.1 Purpose.

The regulations in this part set forth the requirements for approval of coal mine dust sampling devices for determining the concentrations of respirable dust in coal mine atmospheres; procedures for applying for such approval; test procedures; and labeling.

§ 74.2 Definitions.

(a) Accuracy: the ability of a continuous personal dust monitor (CPDM) to determine the “true” concentration of the environment sampled. Accuracy describes the closeness of a typical measurement to the quantity measured, although it is defined and expressed in terms of the relative discrepancy of a typical measurement from the quantity measured. The accuracy of a CPDM is the theoretical maximum error of measurement, expressed as the proportion or percentage of the amount being measured, without regard for the direction of the error, which is achieved with a 0.95 probability by the method.

(b) Bias: the uncorrectable relative discrepancy between the mean of the distribution of measurements from a CPDM and the true concentration being measured.

(c) Coal mine dust personal sampler unit (CMDPSU): a personal device for measuring concentrations of respirable dust in coal mine atmospheres that meets the requirements specified under Subpart B of this part.

(d) Continuous personal dust monitor (CPDM): a sampling device for continuously measuring concentrations of respirable dust in coal mine atmospheres that reports within-shift and end-of shift measurements of dust concentrations immediately upon the completion of the period of exposure that was monitored and that meets the requirements specified under Subpart C of this part.

(e) ISO: the International Organization for Standardization, an international standard-setting organization composed of representatives from various national standards-setting organizations. ISO produces industrial and commercial voluntary consensus standards used worldwide.

(f) Precision: the relative variability of measurements from a homogeneous atmosphere about the mean of the population of measurements, divided by the mean at a given concentration. It reflects the ability of a CPDM to replicate measurement results.

Subpart B Approval Requirements for Coal Mine Dust Personal Sampler Unit
§ 74.3 Sampler unit.

A CMDPSU shall consist of:

(a) A pump unit,

(b) A sampling head assembly, and

(c) If rechargeable batteries are used in the pump unit, a battery charger.

§ 74.4 Specifications of sampler unit.

(a) Pump unit: (1) Dimensions. The overall dimensions of the pump unit, hose connections, and valve or switch covers shall not exceed 4 inches (10 centimeters) in height, 4 inches (10 centimeters) in width, and 2 inches (5 centimeters) in thickness.

(2) Weight. The pump unit shall not weigh more than 20 ounces (567 grams).

(3) Construction. The case and all components of the pump unit shall be of sufficiently durable construction to endure the wear of use in a coal mine, shall be tight fitting to minimize the amount of dust entering the pump case, and shall be designed to protect against radio frequency interference and electromagnetic interference.

(4) Exhaust. The pump shall exhaust into the pump case, maintaining a slight positive pressure which will reduce the entry of dust into the pump case.

(5) Switch. The pump unit shall be equipped with an ON/OFF switch or equivalent device on the outside of the pump case. This switch shall be protected against accidental operation during use and protected to keep dust from entering the mechanisms.

(6) Flow rate adjustment. Except as provided in the last sentence of this paragraph, the pump unit shall be equipped with a suitable means of flow rate adjustment accessible from outside the case. The flow rate adjuster shall be recessed in the pump case and protected against accidental adjustment. If the pump is capable of maintaining the flow rate consistency required in this part without adjustment, an external flow rate adjuster is not required.

(7) Battery. The power supply for the pump shall be a suitable battery located in the pump case or in a separate case which attaches to the pump case by a permissible electrical connection.

(8) Pulsation. (i) The irregularity in flow rate due to pulsation shall have a fundamental frequency of not less than 20 Hz.

(ii) The quantity of respirable dust collected with a sampler unit shall be within ±5 percent of that collected with a sampling head assembly operated with nonpulsating flow.

(9) Belt clips. The pump unit shall be provided with a belt clip which will hold the pump securely on a coal miner's belt.

(10) Recharging connection. A suitable connection shall be provided so that the battery may be recharged without removing the battery from the pump case or from the battery case if a separate battery case is used.

(11) Flow rate indicator. A visual indicator of flow rate shall be provided either as an integral part of the pump unit or of the sampling head assembly. The flow rate indicator shall be calibrated within ±5 percent at 2.2, 2.0, and 1.7 liters per minute to indicate the rate of air passing through the accompanying sampling head assembly.

(12) Flow rate range. The pump shall be capable of operating within a range of from 1.5 to 2.5 liters per minute and shall be adjustable over this range.

(13) Flow rate consistency. The flow shall remain within ±0.1 liters per minute over at least a 10-hour period when the pump is operated at 2 liters per minute with a standard sampling head assembly.

(14) Flow restriction indicator. The pump shall be capable of detecting restricted flow and providing a visual indication if it occurs. The flow restriction indicator shall remain activated until the cause is corrected. The pump shall shut down automatically if flow is restricted for one minute.

(15) Duration of operation. The pump with a fully charged battery pack shall be capable of operating for (i) not less than 8 hours at a flow rate of 2 liters per minute against a resistance of 25 inches (64 centimeters) of water measured at the inlet of the pump; and (ii) for not less than 10 hours at a flow rate of 2 liters per minute against a resistance of 15 inches (38 centimeters) of water measured at the inlet of the pump.

(16) Low battery indicator. The pump unit shall be equipped with a visual indicator of low battery power.

(17) Elapsed time indicator. The pump unit shall be capable of displaying the actual pump run time in minutes (up to 999 minutes) and retaining the last reading after the pump is shut down due to either a flow restriction described in paragraph (a)(14) of this section or low battery power described in paragraph (a)(16) of this section or at the end of the sampling shift.

(b) Sampling head assembly. The sampling head assembly shall consist of a cyclone and a filter assembly as follows:

(1) Cyclone. The cyclone shall consist of a cyclone body with removable grit cap and a vortex finder and shall be constructed of nylon or a material equivalent in performance. The dimensions of the components, with the exception of the grit cap, shall be identical to those of a Dorr-Oliver 10 millimeter cyclone body, part No. 28541/4A or 01B11476-01 and vortex finder, part No. 28541/4B.

(2) Filter assembly. The filter assembly shall meet the following requirements:

(i) Filter. The filter shall be a membrane filter type with a nominal pore size not over 5 micrometers. It shall be nonhydroscopic and shall not dissolve or decompose when immersed in ethyl or isopropyl alcohol. The strength and surface characteristics of the filter shall be such that dust deposited on its surface may be removed by ultrasonic methods without tearing the filter. The filter resistance shall not exceed 2 inches (0.5 centimeters) of water at an airflow rate of 2 liters per minute.

(ii) Capsule. The capsule enclosing the filter shall not permit sample air to leak around the filter and shall prevent visual inspection of the filter surface or filter loading. The capsule shall be made of nonhydroscopic material. Its weight, including the enclosed filter, shall not exceed 5 grams and it shall be pre-weighed by the manufacturer with a precision of ±0.001 milligrams. Impact to the capsule shall not dislodge any dust from the capsule, which might then be lost to the weight measurement.

(iii) Cassette. The cassette shall enclose the capsule so as to prevent contamination and intentional or inadvertent alteration of dust deposited on the filter. The cassette must be easily removable without causing a loss or gain of capsule weight. The cassette shall be designed to prevent contaminants from entering or dust from leaving the capsule when it is not in use, and to prevent the reversal of airflow through the capsule or other means of removing dust collected on the filter.

(3) Arrangement of components. The connections between the cyclone vortex finder and the capsule and between the capsule and the 1/4-inch (0.64 centimeters) (inside diameter) hose mentioned in paragraph (b)(5) of this section shall be mechanically firm and shall not leak at a rate of more than 0.1 liters per hour under a vacuum of 4 inches (10 centimeters) of water.

(4) Clamping of components. The clamping and positioning of the cyclone body, vortex finder, and cassette shall be rigid, remain in alignment, be firmly in contact and airtight. The cyclone-cassette assembly shall be attached firmly to a backing plate or other means of holding the sampling head in position. The cyclone shall be held in position so that the inlet opening of the cyclone is pointing perpendicular to, and away from, the backing plate.

(5) Hose. A 3-foot (91 centimeter) long, 1/4-inch (0.64 centimeters) (inside diameter) clear plastic hose shall be provided to form an airtight connection between the inlet of the sampler pump and the outlet of the filter assembly. A device, capable of sliding along the hose and attaching to the miner's outer garment, shall be provided.

(c) Battery charger. (1) Power supply. The battery charger shall be operated from a 110 (VAC) (nominal), 60 Hz power line.

(2) Connection. The battery charger shall be provided with a cord and polarized connector so that it may be connected to the charge socket on the pump or battery case.

(3) Protection. The battery charger shall be fused, shall have a grounded power plug, and shall not be susceptible to damage by being operated without a battery on charge.

(4) Charge rates. The battery charger shall be capable of fully recharging the battery in the pump unit within 16 hours.

§ 74.5 Tests of coal mine dust personal sampler units.

(a) The National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services, shall conduct tests to determine whether a CMDPSU that is submitted for approval under these regulations meets the requirements set forth in § 74.4.

(b) The Mine Safety and Health Administration (MSHA), Department of Labor, will conduct tests and evaluations to determine whether the pump unit of a CMDPSU that is submitted for approval under these regulations complies with the applicable permissibility provisions of 30 CFR part 18.

[75 FR 17523, Apr. 6, 2010, as amended at 89 FR 99105, Dec. 10, 2024]

§ 74.6 Quality control.

The applicant shall describe the way in which each lot of components will be sampled and tested to maintain its quality prior to assembly of each sampler unit. In order to assure that the quality of the CMDPSU will be maintained in production through adequate quality control procedures, MSHA and NIOSH reserve the right to have their qualified personnel inspect each applicant's control-test equipment procedures and records and to interview the employees who conduct the control tests. Two copies of the results of any tests made by the applicant on the CMDPSU or the pump unit thereof shall accompany an application provided under § 74.13 of this part.

Subpart C Requirements for Continuous Personal Dust Monitors
§ 74.7 Design and construction requirements.

(a) General requirement. Continuous Personal Dust Monitors (CPDMs) shall be designed and constructed for coal miners to wear and operate without impeding their ability to perform their work safely and effectively, and shall be sufficiently durable to perform reliably in the normal working conditions of coal mines.

(b) Ergonomic design testing. Prior to submitting an application under § 74.13, the applicant shall develop a testing protocol and test the CPDM to assure that the device can be worn safely, without discomfort, and without impairing a coal miner in the performance of duties throughout a full work shift. The results of the test shall also demonstrate that the device will operate consistently throughout a full work shift under representative working conditions of underground coal miners, including representative types and durations of physical activity, tasks, and changes in body orientation.

(1) The testing protocol shall specify that the tests be conducted in one or more active mines under routine operating conditions during production shifts.

(2) The applicant shall submit the testing protocol, in writing, to NIOSH for approval prior to conducting such testing.

(3) The applicant shall include the testing protocol and written test results in the application submitted to NIOSH as specified in § 74.13.

(4) NIOSH will advise and assist the applicant, as necessary, to develop a testing protocol and arrange for the conduct of testing specified in this paragraph.

(5) NIOSH may further inspect the device or conduct such tests as it deems necessary to assure the safety, comfort, practicality, and operability of the device when it is worn by coal miners in the performance of their duties.

(6) NIOSH may waive the requirement for the applicant to conduct testing under paragraph (b) of this section if NIOSH determines that such testing is unnecessary to assure the safety, comfort, practicality, and operability of the device when it is worn by coal miners in the performance of their duties.

(c) Maximum weight. A CPDM shall not add more than 2 kg to the total weight carried by the miner. CPDMs that are combined with other functions, such as communication or illumination, may exceed 2 kg provided that the total added weight carried by the miner does not exceed 2 kg.

(d) Dust concentration range. The CPDM shall measure respirable coal mine dust concentrations accurately, as specified under § 74.8, for an end-of-shift average measurement, for concentrations within a range from 0.2 to 4.0 mg/m 3 for respirable coal mine dust. For end-of-shift average concentrations exceeding 4.0 mg/m 3, the CPDM shall provide a reliable indication that the concentration exceeded 4.0 mg/m 3.

(e) Environmental conditions. The CPDM shall operate reliably and accurately as specified under § 74.8, under the following environmental conditions:

(1) At any ambient temperature and varying temperatures from minus 30 to plus 40 degrees centigrade;

(2) At any atmospheric pressure from 700 to 1000 millibars;

(3) At any ambient humidity from 10 to 100 percent relative humidity; and

(4) While exposed to water mists generated for dust suppression and while monitoring atmospheres including such water mists.

(f) Electromagnetic interference. The CPDM shall meet the following standards for control of and protection from electromagnetic interference.

(1) For emissions control, operators must follow: IEEE Std C95.1-2005, (IEEE Standard for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3 kHz to 300 GHz) and 47 CFR 15.1 through 15.407 (FCC Radio Frequency Devices). Persons must proceed in accordance with IEEE Std C95.1-2005 (IEEE Standard for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3 kHz to 300 GHz).

(i) The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Persons may obtain a copy from: American National Standards Institute (ANSI), 25 West 43rd Street, New York, NY 10036. http://www.ansi.org.

(ii) Persons may inspect a copy at MSHA, Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210, 202-693-9440, or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

(2) For immunity/susceptibility protection, operators must follow: IEC 61000-4-6, International Standard (Electromagnetic compatibility—Part 4-6: Testing and measurement techniques—Immunity to conducted disturbances, induced by radio-frequency fields), Edition 3.0, 2008-10. Persons must proceed in accordance with IEC 61000-4-6, International Standard (Electromagnetic compatibility—Part 4-6: Testing and measurement techniques—Immunity to conducted disturbances, induced by radio-frequency fields), Edition 3.0, 2008-10. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

(i) Persons may obtain a copy from the International Electrotechnical Commission at the address provided below:

International Electrotechnical Commission, IEC Central Office, 3, rue de Varembé, P.O. Box 131, CH-1211 GENEVA 20, Switzerland. http://www.standardsinfo.net.

(ii) Persons may inspect a copy at MSHA, Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210, 202-693-9440, or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

(g) Durability testing. The CPDM shall be designed and constructed to remain safe and measure respirable coal mine dust concentrations accurately, as specified under § 74.8 of this section after undergoing the following durability tests, which NIOSH will apply to test devices prior to their use in further testing under § 74.8 of this-subpart:

Vibration | Mil-Std-810F, 514.5 | U.S. Highway Vibration, Restrained Figure 514.5C-1 | 1 Hours/Axis, 3 Axis; Total Duration = 3 Hrs, equivalent to 1,000 miles.

Drop | 3-foot drop onto bare concrete surface | In standard in-use configuration | 1 drop per axis (3 total).

(1) Persons must proceed in accordance with Mil-Std-810F, 514.5, Department of Defense Test Method for Environmental Engineering Considerations and Laboratory Tests, 1 January 2000. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Persons may obtain a copy from the U.S. Department of Defense at the address provided below.

ASC/ENOI, Bldg. 560, 2530 Loop Road West, Wright-Patterson AFB OH 45433-7101. http://www.dtc.army.mil/navigator/.

(2) Persons may inspect a copy at MSHA, Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

(h) Reporting of monitoring results. (1) The CPDM shall report continuous monitoring results legibly or audibly during use. A digital display, if used, shall be illuminated and shall provide a minimum character height of 6 millimeters. Other forms of display (e.g., analogue) must provide comparable visibility. Auditory reporting, if used, shall be clear, have adjustable volume, and provide means for the user to obtain data reports repetitively. The CPDM shall also report end-of-shift results using computer software compatible with current, commonly used personal computer technology.

(2) The CPDM shall report results as cumulative mass concentration in units of mass per volume of air (mg/m 3) with two significant figures of accuracy rounded as customary.

(i) Power requirements. The power source of the CPDM shall have sufficient capacity to enable continuous sampling for 12 hours in a coal mine dust atmosphere of up to 4.0 mg/m 3. If the CPDM uses a rechargeable battery, the battery charger shall be operated from a 110 (VAC) (nominal), 60 Hz power line.

(j) Flow stability and calibration of pump. If a pump is used, the flow shall not vary more than ±5 percent of the calibrated flow for 95 percent of samples taken for any continuous duration for up to 12 hours. The flow calibration maintenance interval to assure such performance shall be specified in the calibration instructions for the device.

(k) Battery check. If the CPDM uses a rechargeable battery, the CPDM shall have a feature to indicate to the user that the device is sufficiently charged to operate and provide accurate measurements for an entire shift of 12 hours under normal conditions of use.

(l) Integration with other personal mining equipment. (1) If the CPDM is integrated or shares functions with any other devices used in mines, such as cap lights or power sources, then the applicant shall obtain approvals for such other devices, prior to receiving final certification of the CPDM under this section.

(2) A CPDM that is integrated with another device shall be tested, according to all the requirements under this part, with the other device coupled to the CPDM and operating.

(m) Tampering safeguards or indicators. The CPDM shall include a safeguard or indicator which either prevents intentional or inadvertent altering of the measuring or reporting functions or indicates that the measuring or reporting functions have been altered.

(n) Maintenance features. The CPDM shall be designed to assure that the device can be cleaned and maintained to perform accurately and reliably for the duration of its service life.

[75 FR 17523, Apr. 6, 2010, as amended at 80 FR 52990, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 74.8 Measurement, accuracy, and reliability requirements.

(a) Breathing zone measurement requirement. The CPDM shall be capable of measuring respirable dust within the personal breathing zone of the miner whose exposure is being monitored.

(b) Accuracy. The ability of a CPDM to determine the true concentration of respirable coal mine dust at the end of a shift shall be established through testing that demonstrates the following:

(1) For full-shift measurements of 8 hours or more, a 95 percent confidence that the recorded measurements are within ±25 percent of the true respirable dust concentration, as determined by CMDPSU reference measurements, over a concentration range from 0.2 to 4.0 mg/m 3; and

(2) For intra-shift measurements of less than 8 hours, a 95 percent confidence that the recorded measurements are within ±25 percent of the true respirable dust concentration, as determined by CMDPSU reference measurements, over the concentration range equivalent to 0.2 to 4.0 mg/m 3 for an 8-hour period. 1

1 The equivalent dust concentration range to the 8-hour range of 0.2 − 4 mg/m 3 is calculated by multiplying this 8-hour range by the dividend of eight hours divided by the duration of the intrashift measurement specified in units of hours. For example, for a measurement taken at exactly one hour into the shift, the 8-hour equivalent dust concentration range would be a one-hour average concentration range of: 8 hours/1 hour × (0.2 − 4 mg/m 3) = 1.6 − 32 mg/m 3; for a two-hour measurement, the applicable concentration range would be calculated as: 8 hours/2 hours × (0.2 − 4 mg/m 3) = 0.8 − 16 mg/m 3; for a 4-hours measurement, the equivalent range would be: 0.4 − 8 mg/m 3; * * * etc. A CPDM must perform accurately, as specified, for intrashift measurements within such equivalent concentration ranges.

(c) Reliability of measurements. The CPDM shall meet the accuracy requirements under paragraph (b) of this section, regardless of the variation in density, composition, size distribution of respirable coal mine dust particles, and the presence of water spray mist in coal mines.

(d) Precision. The precision of the CPDM shall be established through testing to determine the variability of multiple measurements of the same dust concentration, as defined by the relative standard deviation of the distribution of measurements. The relative standard deviation shall be less than 0.1275 without bias for both full-shift measurements of 8 hours or more, and for intra-shift measurements of less than 8 hours within the dust concentration range equivalent to 0.2 to 4.0 mg/m 3 for an 8-hour period, as specified under paragraph (b)(2) of this section.

(e) Bias. The bias of the CPDM measurements shall be limited such that the uncorrectable discrepancy between the mean of the distribution of measurements and the true dust concentration being measured during testing shall be no greater than 10 percent. Bias must be constant over the range of dust concentration levels tested, 0.2 to 4.0 mg/m 3 for an 8-hour sampling period.

(f) Testing conditions. Laboratory and mine testing of the CPDM for accuracy, precision, bias, and reliability under diverse environmental conditions (as defined under § 74.7(e) and (g)) shall be determined using the NIOSH testing procedure, “Continuous Personal Dust Monitor Accuracy Testing,” June 23, 2008, available at: http://www.cdc.gov/niosh/mining/pubs/pubreference/outputid3076.htm. All testing results shall be submitted to NIOSH in writing on the application filed under § 74.11.

(1) Persons must proceed in accordance with NIOSH testing procedure “Continuous Personal Dust Monitor Accuracy Testing,” June 23, 2008. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Persons may obtain a copy at the address below: NIOSH-Publications Dissemination, 4676 Columbia Parkway, Cincinnati, OH 45226. http://www.cdc.gov/niosh/mining.

(2) Persons may inspect a copy at MSHA, Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

[75 FR 17523, Apr. 6, 2010, as amended at 80 FR 52990, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 74.9 Quality assurance.

(a) General requirements. The applicant shall establish and maintain a quality control system that assures that CPDM devices produced under the applicant's certificate of approval meet the required specifications and are reliable, safe, effective, and otherwise suitable for their intended use. To establish and to maintain an approval under this part, the applicant shall:

(1) Submit a copy of the most recent registration under ISO Q9001-2000, American National Standard, Quality Management Systems-Requirements, published by ISO:

(i) With the application for approval under § 74.13 of this part; and

(ii) Upon request by NIOSH, subsequent to the approval of a CPDM under this part.

(2) Persons must proceed in accordance with ISO Q9001-2000, American National Standard, Quality Management Systems-Requirements. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Persons may obtain a copy from the International Organization for Standardization at the address provided below.

International Organization for Standardization, ISO Central Secretariat, 1, ch. de la Voie-Creuse, Case Postale 56, CH-1211 GENEVA 20, Switzerland. http://www.standardsinfo.net.

(3) Persons may inspect a copy at MSHA, Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

(b) Quality management audits. Upon request, applicants or approval holders must allow NIOSH to inspect the quality management procedures and records, and to interview any employees who may be knowledgeable of quality management processes associated with the production of the CPDM. Audits may be conducted either on an occasional or periodic basis or in response to quality-related complaints or concerns.

(c) Applicant remediation of quality management deficiencies. An applicant or approval holder must correct any quality management deficiency identified by an audit within a reasonable time as determined by NIOSH. Failure to correct a deficiency may result in NIOSH disapproval of a pending application or, in the case of an approved device, revocation of approval until NIOSH determines that the deficiency is corrected.

[75 FR 17523, Apr. 6, 2010, as amended at 80 FR 52990, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 74.10 Operating and maintenance instructions.

(a) Contents. The manufacturer must include operating and storage instructions and a maintenance and service life plan with each new CPDM device sold. These documents must be clearly written.

(1) Operating and storage instructions must include:

(i) An explanation of how the CPDM works;

(ii) A schematic diagram of the CPDM;

(iii) Procedures for wearing and use of the CPDM;

(iv) A one page “quick start guide” that will enable a novice to start and operate the CPDM.

(v) Procedures for calibration of the CPDM;

(vi) Procedures for inspecting the operating condition of the CPDM;

(vii) Procedures and conditions for storage, including the identification of any storage conditions that would likely impair the effective functioning of the CPDM; and

(viii) Procedures and conditions of use, including identification of any conditions of use that would likely impair the effective functioning of the CPDM.

(2) The maintenance and service life plan must address:

(i) Conditions that should govern the removal from service of the CPDM; and

(ii) Procedures that a user or others should follow when inspecting, performing maintenance and calibration, and determining when the CPDM should be removed from service.

(b) Submission to NIOSH for approval. A copy of the instructions and plan under paragraph (a) of this section shall be submitted to NIOSH with the application for approval of the CPDM and if substantive changes are made to the approved device or approved instructions.

§ 74.11 Tests of the continuous personal dust monitor.

(a) Applicant testing. The applicant shall conduct tests to determine whether a CPDM that is submitted for approval under these regulations meets the requirements specified in §§ 74.7-74.8 of this part, with the exception of durability testing, which shall be conducted by NIOSH as specified in § 74.7(g) of this part. Applicant testing shall be performed by an independent testing entity approved by NIOSH.

(b) NIOSH testing assistance. NIOSH will provide consultation to the applicant to identify and secure necessary testing services for meeting the requirements specified in §§ 74.7-74.8 of this part. Applicants must submit testing protocols to NIOSH prior to testing to verify that the testing protocols adequately address the requirements.

(c) Reporting of applicant testing results. The applicant shall include the results from testing specified under paragraph (a) of this section when submitting the application under § 74.13 of this part to NIOSH.

(d) Intrinsic safety testing. The applicant shall submit the CPDM to MSHA for testing and evaluation, pursuant to 30 CFR part 18, to determine whether the electronic components of the CPDM submitted for approval meet the applicable permissibility provisions.

[75 FR 17523, Apr. 6, 2010, as amended at 89 FR 99105, Dec. 10, 2024]

Subpart D General Requirements for All Devices
§ 74.12 Conduct of tests; demonstrations.

(a) Prior to the issuance of a certificate of approval, only personnel of MSHA and NIOSH, representatives of the applicant, and such other persons as may be mutually agreed upon may observe the tests conducted. MSHA and NIOSH shall hold as confidential, and shall not disclose, principles of patentable features, nor shall MSHA or NIOSH disclose any details of the applicant's drawings or specifications or other related material.

(b) After the issuance of a certificate of approval, MSHA or NIOSH will conduct such public demonstrations and tests of the approved device as MSHA or NIOSH deem appropriate, and may reveal the protocols and results of testing considered for the approval of the device. The conduct of any additional investigations, tests, and demonstrations shall be under the sole direction of MSHA and NIOSH and any other persons shall be present only as observers.

§ 74.13 Applications.

(a) Testing of a CMDPSU will be performed by NIOSH, and testing of the pump unit of the CMDPSU will be conducted by MSHA. The applicant must submit a written application in duplicate to both NIOSH and MSHA. Each copy of the application must be accompanied by complete scale drawings, specifications, and a description of materials. Ten complete CMDPSUs must be submitted to NIOSH with the application, and one pump unit must be submitted to MSHA.

(b) Testing of a CPDM will be performed by the applicant as specified under § 74.11. The applicant must submit a written application in duplicate to both NIOSH and MSHA. Each copy of the application must be accompanied by complete scale drawings, specifications, a description of materials, and a copy of the testing protocol and test results which were provided by an independent testing entity, as specified in § 74.11(a). Three complete CPDM units must be sent to NIOSH with the application, and one CPDM device must be sent to MSHA.

(c) Complete drawings and specifications accompanying each copy of the application shall be fully detailed to identify the design of the CMDPSU or pump unit thereof or of the CPDM and to disclose the dimensions and materials of all component parts.

§ 74.14 Certificate of approval.

(a) Upon completion of the testing of a CMDPSU or the pump unit or after review of testing protocols and testing results for the CPDM, NIOSH or MSHA, as appropriate, shall issue to the applicant either a certificate of approval or a written notice of disapproval. NIOSH will not issue a certificate of approval unless MSHA has first issued a certificate of approval for either the pump unit of a CMDPSU or for the CPDM. If a certificate of approval is issued, no test data or detailed results of tests will accompany such approval. If a notice of disapproval is issued, it will be accompanied by details of the defects, resulting in disapproval, with a view to possible correction.

(b) A certificate of approval will be accompanied by a list of the drawings and specifications covering the details of design and construction of the CMDPSU and the pump unit, or of the CPDM, as appropriate, upon which the certificate of approval is based. The applicant shall keep exact duplicates of the drawings and specifications submitted to NIOSH and to MSHA relating to the CMDPSU, the pump unit thereof, or the CPDM, which has received a certificate of approval. The approved drawings and specifications shall be adhered to exactly in the production of the certified CMDPSU, including the pump unit or of the CPDM, for commercial purposes. In addition, the applicant shall observe such procedures for, and keep such records of, the control of component parts as either MSHA or NIOSH may in writing require as a condition of approval.

§ 74.15 Approval labels.

(a) Certificate of approval will be accompanied by photographs of designs for the approval labels to be affixed to each CMDPSU or CPDM, as appropriate.

(b) The labels showing approval by NIOSH and by MSHA shall contain such information as MSHA or NIOSH may require and shall be reproduced legibly on the outside of a CMDPSU or CPDM, as appropriate, as directed by NIOSH or MSHA.

(c) The applicant shall submit full-scale designs or reproductions of approval labels and a sketch or description of the position of the labels on each sampling device.

(d) Use of the approval labels obligates the applicant to whom the certificate of approval was issued to maintain the quality of the complete CMDPSU or CPDM, as appropriate, and to guarantee that the complete CMDPSU or CPDM, as appropriate, is manufactured or assembled according to the drawings and specifications upon which the certificate of approval was based. Use of the approval labels is authorized only on CMDPSUs or CPDMs, as appropriate, that conform to the drawings and specifications upon which the certificate of approval we based.

§ 74.16 Material required for record.

(a) As part of the permanent record of the approval application process, NIOSH will retain a complete CMDPSU or CPDM, as appropriate, and MSHA will retain a CMDPSU or CPDM, as appropriate, that has been tested and certified. Material not required for record purposes will be returned to the applicant at the applicant's request and expense upon receipt of written shipping instructions by MSHA or NIOSH.

(b) As soon as a CMDPSU or CPDM, as appropriate, is commercially available, the applicant shall deliver a complete sampling device free of charge to NIOSH at the address specified on the NIOSH Web page: http://www.cdc.gov/niosh/mining.

§ 74.17 Changes after certification.

(a) If the applicant desires to change any feature of a certified CMDPSU or a certified CPDM, the applicant shall first obtain the approval of NIOSH pursuant to the following procedures:

(1) Application shall be made as for an original certificate of approval, requesting that the existing certification be extended to encompass the proposed change. The application shall be accompanied by drawings, specifications, and related material.

(2) The application and accompanying material will be examined by NIOSH to determine whether testing of the modified CMDPSU or CPDM or components will be required. Testing will be necessary if there is a possibility that the modification may adversely affect the performance of the CMDPSU or CPDM. NIOSH will inform the applicant whether such testing is required.

(3) If the proposed modification meets the pertinent requirements of these regulations, a formal extension of certification will be issued, accompanied by a list of new and revised drawings and specifications to be added to those already on file as the basis for the extension of certification.

(b) If a change is proposed in a pump unit of a certified CMDPSU or in electrical components of a CPDM, the approval of MSHA with respect to intrinsic safety shall be obtained in accordance with the procedures set forth in § 74.11(d).

§ 74.18 Withdrawal of certification.

Any certificate of approval issued under this part may be revoked for cause by NIOSH or MSHA which issued the certificate.

PART 75 MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES

Authority: 30 U.S.C. 811, 813(h), 957.

Source: 35 FR 17890, Nov. 20, 1970, unless otherwise noted.

Editorial Note: The provisions of this part marked [Statutory Provision] appear in Title III of the Federal Coal Mine Health and Safety Act of 1969.

Subpart A General
§ 75.1 Scope.

This part 75 sets forth safety standards compliance with which is mandatory in each underground coal mine subject to the Federal Mine Safety and Health Act of 1977. Some standards also are applicable to surface operations. Regulations and criteria supplementary to these standards also are set forth in this part.

[35 FR 17890, Nov. 20, 1970, as amended at 43 FR 12319, Mar. 24, 1978]

§ 75.2 Definitions.

The following definitions apply in this part.

Act. The Federal Mine Safety and Health Act of 1977.

Active workings. Any place in a coal mine where miners are normally required to work or travel.

Adequate interrupting capacity. The ability of an electrical protective device, based upon its required and intended application, to safely interrupt values of current in excess of its trip setting or melting point.

Anthracite. Coals with a volatile ratio equal to 0.12 or less. The volatile ratio is the volatile matter content divided by the volatile matter plus the fixed carbon.

Approval documentation. Formal papers issued by the Mine Safety and Health Administration which describe and illustrate the complete assembly of electrical machinery or accessories which have met the applicable requirements of 30 CFR part 18.

Certified or registered. As applied to any person, a person certified or registered by the State in which the coal mine is located to perform duties prescribed by this part 75, except that in a State where no program of certification or registration is provided or where the program does not meet at least minimum Federal standards established by the Secretary, such certification or registration shall be by the Secretary.

Circuit-interrupting device. A device designed to open and close a circuit by nonautomatic means and to open the circuit automatically at a predetermined overcurrent value without damage to the device when operated within its rating.

Coal mine. Includes areas of adjoining mines connected underground.

Filter Self-Rescuer (FSR). A type of gas mask approved by MSHA and NIOSH under 42 CFR part 84 for escape only from underground mines and which provides at least 1 hour of protection against carbon monoxide.

Ground fault or grounded phase. An unintentional connection between an electric circuit and the grounding system.

Low voltage. Up to and including 660 volts, medium voltage means voltages from 661 to 1,000 volts; and high voltage means more than 1,000 volts.

Motor-starter enclosure. An enclosure containing motor starting circuits and equipment.

Nominal voltage. The phase-to-phase or line-to-line root-mean-square value assigned to a circuit or system for designation of its voltage class, such as 480 or 4,160 volts. Actual voltage at which the circuit or system operates may vary from the nominal voltage within a range that permits satisfactory operation of equipment.

Permissible. (1) As applied to electric face equipment, all electrically operated equipment taken into or used inby the last open crosscut of an entry or a room of any coal mine the electrical parts of which, including, but not limited to, associated electrical equipment, components, and accessories, are designed, constructed, and installed, in accordance with the specifications of the Secretary, to assure that such equipment will not cause a mine explosion or mine fire, and the other features of which are designed and constructed, in accordance with the specifications of the Secretary, to prevent, to the greatest extent possible, other accidents in the use of such equipment. The regulations of the Secretary or the Director of the Bureau of Mines in effect on March 30, 1970, relating to the requirements for investigation, testing, approval, certification, and acceptance of such equipment as permissible shall continue in effect until modified or superseded by the Secretary, except that the Secretary shall provide procedures, including, where feasible, testing, approval, certification, and acceptance in the field by an authorized representative of the Secretary, to facilitate compliance by an operator with the requirements of § 75.500 within the periods prescribed in § 75.500.

(2) As applied to equipment other than permissible electric face equipment: (i) Equipment used in the operation of a coal mine to which an approval plate, label, or other device is attached as authorized by the Secretary and which meets specifications which are prescribed by the Secretary for the construction and maintenance of such equipment and are designed to assure that such equipment will not cause a mine explosion or a mine fire. (ii) The manner of use of equipment means the manner of use prescribed by the Secretary.

Qualified person. As the context requires:

(1) An individual deemed qualified by the Secretary and designated by the operator to make tests and examinations required by this part 75; and

(2) An individual deemed, in accordance with minimum requirements to be established by the Secretary, qualified by training, education, and experience, to perform electrical work, to maintain electrical equipment, and to conduct examinations and tests of all electrical equipment.

Respirable dust. Dust collected with a sampling device approved by the Secretary and the Secretary of Health and Human Services in accordance with part 74—Coal Mine Dust Personal Sampler Units of this title. Sampling device approvals issued by the Secretary of the Interior and Secretary of Health, Education, and Welfare are continued in effect.

Rock dust. Pulverized limestone, dolomite, gypsum, anhydrite, shale, adobe, or other inert material, preferably light colored, 100 percent of which will pass through a sieve having 20 meshes per linear inch and 70 percent or more of which will pass through a sieve having 200 meshes per linear inch; the particles of which when wetted and dried will not cohere to form a cake which will not be dispersed into separate particles by a light blast of air; and which does not contain more than 5 percent combustible matter or more than a total of 4 percent free and combined silica (SiO2), or, where the Secretary finds that such silica concentrations are not available, which does not contain more than 5 percent of free and combined silica.

Secretary. The Secretary of Labor or the Secretary's delegate.

Self-Contained Self-Rescuer (SCSR). A type of closed-circuit, self-contained breathing apparatus approved by MSHA and NIOSH under 42 CFR part 84 for escape only from underground mines.

Short circuit. An abnormal connection of relatively low impedance, whether made accidentally or intentionally, between two points of different potential.

Working face. Any place in a coal mine in which work of extracting coal from its natural deposit in the earth is performed during the mining cycle.

Working place. The area of a coal mine inby the last open crosscut.

Working section. All areas of the coal mine from the loading point of the section to and including the working faces.

[57 FR 20913, May 15, 1992, as amended at 60 FR 30401, June 8, 1995; 67 FR 11001, Mar. 11, 2002]

Subpart B Qualified and Certified Persons
§ 75.100 Certified person.

(a) The provisions of Subpart D—Ventilation of this part 75 require that certain examinations and tests be made by a certified person. A certified person within the meaning of those provisions is a person who has been certified as a mine foreman (mine manager), an assistant mine foreman (section foreman), or a preshift examiner (mine examiner). A person who has been so certified is also a qualified person within the meaning of those provisions of subpart D of this part which require that certain tests be made by a qualified person and within the meaning of § 75.1106.

(b) A person who is certified as a mine foreman, an assistant mine foreman, or a preshift examiner by the State in which the coal mine is located is, to the extent of the State's certification, a certified person within the meaning of the provisions of subpart D of this part and § 75.1106 referred to in paragraph (a) of this section.

(c)(1) The Secretary may certify persons in the categories of mine foreman, assistant mine foreman, and preshift examiner whenever the State in which persons are presently employed in these categories does not provide for such certification. A person's initial certification by MSHA is valid for as long as the person continues to satisfy the requirements necessary to obtain the certification and is employed at the same coal mine or by the same independent contractor. The mine operator or independent contractor shall make an application which satisfactorily shows that each such person has had at least 2 years underground experience in a coal mine, and has held the position of mine foreman, assistant mine foreman, or preshift examiner for a period of 6 months immediately preceding the filing of the application, and is qualified to test for methane and for oxygen deficiency. Applications for Secretarial certification should be submitted in writing to the Health and Safety Activity, Mine Safety and Health Administration, Certification and Qualification Center, P.O. Box 25367, Denver Federal Center, Denver, Colorado 80225.

(2) A person certified by the Secretary under this paragraph will be a certified person, within the meaning of the provisions for subpart D of this part and § 75.1106 referred to in paragraph (a) of this section, as long as that person continues to satisfy the requirements for qualification or certification and is employed at the same coal mine or by the same independent contractor.

[35 FR 17890, Nov. 20, 1970, as amended at 43 FR 12320, Mar. 24, 1978; 54 FR 30514, July 20, 1989]

§ 75.150 Tests for methane and for oxygen deficiency; qualified person.

(a) The provisions of Subpart D—Ventilation of this part and § 75.1106 require that tests for methane and for oxygen deficiency be made by a qualified person. A person is a qualified person for this purpose if he is a certified person under § 75.100.

(b) Pending issuance of Federal standards, a person will be considered a qualified person for testing for methane and for oxygen deficiency:

(1) If he has been qualified for this purpose by the State in which the coal mine is located; or

(2) The Secretary may qualify persons for this purpose in a coal mine in which persons are not qualified for this purpose by the State upon an application and a satisfactory showing by the operator of the coal mine that each such person has been trained and designated by the operator to test for methane and oxygen deficiency and has made such tests for a period of 6 months immediately preceding the application. Applications for Secretarial qualification should be submitted to the Health and Safety Activity, Mine Safety and Health Administration, Certification and Qualification Center, P.O. Box 25367, Denver Federal Center, Denver, Colo. 80225.

[35 FR 17890, Nov. 20, 1970, as amended at 43 FR 12320, Mar. 24, 1978]

§ 75.151 Tests for methane; qualified person; additional requirement.

Notwithstanding the provisions of § 75.150, on and after January 1, 1971, no person shall be a qualified person for testing for methane unless he demonstrates to the satisfaction of an authorized representative of the Secretary that he is qualified to test for methane with a portable methane detector approved by the Bureau of Mines or the Mine Safety and Health Administration under part 22 of this chapter (Bureau of Mines Schedule 8C).

§ 75.152 Tests of air flow; qualified person.

A person is a qualified person within the meaning of the provisions of Subpart D—Ventilation of this part requiring that tests of air flow be made by a qualified person only if he is a certified person under § 75.100 or a person trained and designated by a certified person to perform such tests.

§ 75.153 Electrical work; qualified person.

(a) Except as provided in paragraph (f) of this section, an individual is a qualified person within the meaning of §§ 75.511 and 75.512 to perform electrical work (other than work on energized surface high-voltage lines) if:

(1) He has been qualified as a coal mine electrician by a State that has a coal mine electrical qualification program approved by the Secretary; or,

(2) He has at least 1 year of experience in performing electrical work underground in a coal mine, in the surface work areas of an underground coal mine, in a surface coal mine, in a noncoal mine, in the mine equipment manufacturing industry, or in any other industry using or manufacturing similar equipment, and has satisfactorily completed a coal mine electrical training program approved by the Secretary; or,

(3) He has at least 1 year of experience, prior to the date of the application required by paragraph (c) of this section, in performing electrical work underground in a coal mine, in the surface work areas of an underground coal mine, in a surface coal mine, in a noncoal mine, in the mine equipment manufacturing industry, or in any other industry using or manufacturing similar equipment, and he attains a satisfactory grade on each of the series of five written tests approved by the Secretary and prescribed in paragraph (b) of this section.

(b) The series of five written tests approved by the Secretary shall include the following categories:

(1) Direct current theory and application;

(2) Alternating current theory and application;

(3) Electric equipment and circuits;

(4) Permissibility of electric equipment; and,

(5) Requirements of subparts F through K of this part 75.

(c) In order to take the series of five written tests approved by the Secretary, an individual shall apply to the District Manager and shall certify that he meets the requirements of paragraph (a)(3) of this section. The tests will be administered in the Coal Mine Safety and Health Districts at regular intervals, or as demand requires.

(d) A score of at least 80 percent of each of the five written tests will be deemed to be a satisfactory grade. Recognition shall be given to practical experience in that 1 percentage point shall be added to an individual's score in each test for each additional year of experience beyond the 1 year minimum requirement specified in paragraph (a)(3) of this section; however, in no case shall an individual be given more than 5 percentage points for such practical experience.

(e) An individual may, within 30 days from the date on which he received notification from the Administration of his test scores, repeat those on which he received an unsatisfactory score. If further retesting is necessary after this initial repetition, a minimum of 30 days from the date of receipt of notification of the initial retest scores shall elapse prior to such further retesting.

(f) An individual who has, prior to November 1, 1972, been qualified to perform electrical work specified in §§ 75.511 and 75.512 (other than work on energized surface high-voltage lines) shall continue to be qualified until June 30, 1973. To remain qualified after June 30, 1973, such individual shall meet the requirements of either paragraph (a) (1), (2), or (3) of this section.

(g) An individual qualified in accordance with this section shall, in order to retain qualification, certify annually to the District Manager, that he has satisfactorily completed a coal mine electrical retraining program approved by the Secretary.

[37 FR 22376, Oct. 19, 1972, as amended at 44 FR 9380, Feb. 13, 1979; 47 FR 23641, May 28, 1982]

§ 75.154 Repair of energized surface high voltage lines; qualified person.

An individual is a qualified person within the meaning of § 75.705 for the purpose of repairing energized surface high voltage lines only if he has had at least 2 years experience in electrical maintenance, and at least 2 years experience in the repair of energized high voltage surface lines located on poles or structures.

§ 75.155 Qualified hoisting engineer; qualifications.

(a)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating a steam-driven hoist in a coal mine, if he has at least 1 year experience as an engineer in a steam-driven hoisting plant and is qualified by the State in which the mine is located as a steam-hoisting engineer; or

(2) If a State has no program for qualifying persons as steam-hoisting engineers, the Secretary may qualify persons for this purpose if the operator of the coal mine in which such persons are employed, or the independent contractor, makes an application and a satisfactory showing that each such person has had 1 year experience in operating steam-driven hoists and has held the position of hoisting engineer for a period of 6 months immediately preceding the application. A person's qualification is valid for as long as this person continues to satisfy the requirements necessary for qualification and is employed at the same coal mine or by the same independent contractor.

(b)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating an electrically driven hoist in a coal mine, if he has at least 1 year experience operating a hoist plant in a mine or maintaining electric-hoist equipment in a mine and is qualified by the State in which the mine is located as an electric-hoisting engineer; or

(2) If a State has no program for qualifying persons as electric-hoisting engineers, the Secretary may qualify persons for this purpose if the operator of the coal mine in which such persons are employed, or the independent contractor, makes an application and a satisfactory showing that each such person has had 1 year experience in operating electric-driven hoists and has held the position of hoisting engineer for a period of 6 months immediately preceding the application. A person's qualification is valid for as long as this person continues to satisfy the requirements for qualification and is employed at the same coal mine or by the same independent contractor.

(c) Applications for Secretarial qualification should be submitted to the Health and Safety Activity, Mine Safety and Health Administration, Certification and Qualification Center, P.O. Box 25367, Denver Federal Center, Denver, Colo. 80225.

[35 FR 17894, Nov. 20, 1970, as amended at 43 FR 12320, Mar. 24, 1978; 54 FR 30515, July 20, 1989]

§ 75.156 AMS operator, qualifications.

(a) To be qualified as an AMS operator, a person shall be provided with task training on duties and responsibilities at each mine where an AMS operator is employed in accordance with the mine operator's approved Part 48 training plan.

(b) An AMS operator must be able to demonstrate to an authorized representative of the Secretary that he/she is qualified to perform in the assigned position.

[73 FR 80612, Dec. 31, 2008]

§ 75.159 Records of certified and qualified persons.

The operator of each coal mine shall maintain a list of all certified and qualified persons designated to perform duties under this part 75.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.160 Training programs.
215 [Statutory Provision]
§ 75.161 Plans for training programs.

Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what, when, how, and where the operator will train and retrain persons whose work assignments require that they be certified or qualified. The program must provide—

(a) For certified persons, annual training courses in first aid, principles of mine rescue, and the provisions of this part 75; and

(b) For qualified persons, annual courses in performance of the task which they perform as qualified persons.

[63 FR 53761, Oct. 6, 1998]

Subpart C Roof Support

Source: 53 FR 2375, Jan. 27, 1988, unless otherwise noted.

§ 75.200 Scope.

This subpart C sets forth requirements for controlling roof, face and ribs, including coal or rock bursts, in underground coal mines. Roof control systems installed prior to the effective date of this subpart are not affected so long as the support system continues to effectively control the roof, face and ribs.

§ 75.201 Definitions.

Automated temporary roof support (ATRS) system. A device to provide temporary roof support from a location where the equipment operator is protected from roof falls.

Pillar recovery. Any reduction in pillar size during retreat mining.

§ 75.202 Protection from falls of roof, face and ribs.

(a) The roof, face and ribs of areas where persons work or travel shall be supported or otherwise controlled to protect persons from hazards related to falls of the roof, face or ribs and coal or rock bursts.

(b) No person shall work or travel under unsupported roof unless in accordance with this subpart.

§ 75.203 Mining methods.

(a) The method of mining shall not expose any person to hazards caused by excessive widths of rooms, crosscuts and entries, or faulty pillar recovery methods. Pillar dimensions shall be compatible with effective control of the roof, face and ribs and coal or rock bursts.

(b) A sightline or other method of directional control shall be used to maintain the projected direction of mining in entries, rooms, crosscuts and pillar splits.

(c) A sidecut shall be started only from an area that is supported in accordance with the roof control plan.

(d) A working face shall not be mined through into an unsupported area of active workings, except when the unsupported area is inaccessible.

(e) Additional roof support shall be installed where—

(1) The width of the opening specified in the roof control plan is exceeded by more than 12 inches; and

(2) The distance over which the excessive width exists is more than 5 feet.

§ 75.204 Roof bolting.

(a) For roof bolts and accessories addressed in ASTM F432-95, “Standard Specification for Roof and Rock Bolts and Accessories,” the mine operator shall—

(1) Obtain a manufacturer's certification that the material was manufactured and tested in accordance with the specifications of ASTM F432-95; and

(2) Make this certification available to an authorized representative of the Secretary and to the representative of miners.

(b) Roof bolts and accessories not addressed in ASTM F432-95 may be used, provided that the use of such materials is approved by the District Manager based on—

(1) Demonstrations which show that the materials have successfully supported the roof in an area of a coal mine with similar strata, opening dimensions and roof stresses; or

(2) Tests which show the materials to be effective for supporting the roof in an area of the affected mine which has similar strata, opening dimensions and roof stresses as the area where the roof bolts are to be used. During the test process, access to the test area shall be limited to persons necessary to conduct the test.

(c)(1) A bearing plate shall be firmly installed with each roof bolt.

(2) Bearing plates used directly against the mine roof shall be at least 6 inches square or the equivalent, except that where the mine roof is firm and not susceptible to sloughing, bearing plates 5 inches square or the equivalent may be used.

(3) Bearing plates used with wood or metal materials shall be at least 4 inches square or the equivalent.

(4) Wooden materials that are used between a bearing plate and the mine roof in areas which will exist for three years or more shall be treated to minimize deterioration.

(d) When washers are used with roof bolts, the washers shall conform to the shape of the roof bolt head and bearing plate.

(e)(1) The diameter of finishing bits shall be within a tolerance of plus or minus 0.030 inch of the manufacturer's recommended hole diameter for the anchor used.

(2) When separate finishing bits are used, they shall be distinguishable from other bits.

(f) Tensioned roof bolts. (1) Roof bolts that provide support by creating a beam of laminated strata shall be at least 30 inches long. Roof bolts that provide support by suspending the roof from overlying stronger strata shall be long enough to anchor at least 12 inches into the stronger strata.

(2) Test holes, spaced at intervals specified in the roof control plan, shall be drilled to a depth of at least 12 inches above the anchorage horizon of mechanically anchored tensioned bolts being used. When a test hole indicates that bolts would not anchor in competent strata, corrective action shall be taken.

(3) The installed torque or tension ranges for roof bolts as specified in the roof control plan shall maintain the integrity of the support system and shall not exceed the yield point of the roof bolt nor anchorage capacity of the strata.

(4) In each roof bolting cycle, the actual torque or tension of the first tensioned roof bolt installed with each drill head shall be measured immediately after it is installed. Thereafter, for each drill head used, at least one roof bolt out of every four installed shall be measured for actual torque or tension. If the torque or tension of any of the roof bolts measured is not within the range specified in the roof control plan, corrective action shall be taken.

(5) In working places from which coal is produced during any portion of a 24-hour period, the actual torque or tension on at least one out of every ten previously installed mechanically anchored tensioned roof bolts shall be measured from the outby corner of the last open crosscut to the face in each advancing section. Corrective action shall be taken if the majority of the bolts measured—

(i) Do not maintain at least 70 percent of the minimum torque or tension specified in the roof control plan, 50 percent if the roof bolt plates bear against wood; or

(ii) Have exceeded the maximum specified torque or tension by 50 percent.

(6) The mine operator or a person designated by the operator shall certify by signature and date that measurements required by paragraph (f)(5) of this section have been made. This certification shall be maintained for at least one year and shall be made available to an authorized representative of the Secretary and representatives of the miners.

(7) Tensioned roof bolts installed in the roof support pattern shall not be used to anchor trailing cables or used for any other purpose that could affect the tension of the bolt. Hanging trailing cables, line brattice, telephone lines, or other similar devices which do not place sudden loads on the bolts are permitted.

(8) Angle compensating devices shall be used to compensate for the angle when tensioned roof bolts are installed at angles greater than 5 degrees from the perpendicular to the bearing plate.

(g) Non-tensioned grouted roof bolts. The first non-tensioned grouted roof bolt installed during each roof bolting cycle shall be tested during or immediately after the first row of bolts has been installed. If the bolt tested does not withstand at least 150 foot-pounds of torque without rotating in the hole, corrective action shall be taken.

[53 FR 2375, Jan. 27, 1988, as amended at 55 FR 4595, Feb. 8, 1990; 63 FR 20030, Apr. 22, 1998]

§ 75.205 Installation of roof support using mining machines with integral roof bolters.

When roof bolts are installed by a continuous mining machine with integral roof bolting equipment:

(a) The distance between roof bolts shall not exceed 10 feet crosswise.

(b) Roof bolts to be installed 9 feet or more apart shall be installed with a wooden crossbar at least 3 inches thick and 8 inches wide, or material which provides equivalent support.

(c) Roof bolts to be installed more than 8 feet but less than 9 feet apart shall be installed with a wooden plank at least 2 inches thick and 8 inches wide, or material which provides equivalent support.

§ 75.206 Conventional roof support.

(a) Except in anthracite mines using non-mechanized mining systems, when conventional roof support materials are used as the only means of support—

(1) The width of any opening shall not exceed 20 feet;

(2) The spacing of roadway roof support shall not exceed 5 feet;

(3)(i) Supports shall be installed to within 5 feet of the uncut face;

(ii) When supports nearest the face must be removed to facilitate the operation of face equipment, equivalent temporary support shall be installed prior to removing the supports;

(4) Straight roadways shall not exceed 16 feet wide where full overhead support is used and 14 feet wide where only posts are used;

(5) Curved roadways shall not exceed 16 feet wide; and

(6) The roof at the entrance of all openings along travelways which are no longer needed for storing supplies or for travel of equipment shall be supported by extending the line of support across the opening.

(b) Conventional roof support materials shall meet the following specifications:

(1) The minimum diameter of cross-sectional area of wooden posts shall be as follows:

Post length (in inches) | Diameter of round posts (in inches) | Cross-sectional area of split posts (in square inches)

60 or less | 4 | 13

Over 60 to 84 | 5 | 20

Over 84 to 108 | 6 | 28

Over 108 to 132 | 7 | 39

Over 132 to 156 | 8 | 50

Over 156 to 180 | 9 | 64

Over 180 to 204 | 10 | 79

Over 204 to 228 | 11 | 95

Over 228 | 12 | 113

(2) Wooden materials used for support shall have the following dimensions:

(i) Cap blocks and footings shall have flat sides and be at least 2 inches thick, 4 inches wide and 12 inches long.

(ii) Crossbars shall have a minimum cross-sectional area of 24 square inches and be at least 3 inches thick.

(iii) Planks shall be at least 6 inches wide and 1 inch thick.

(3) Cribbing materials shall have at least two parallel flat sides.

(c) A cluster of two or more posts that provide equivalent strength may be used to meet the requirements of paragraph (b)(1) of this section, except that no post shall have a diameter less than 4 inches or have a cross-sectional area less than 13 square inches.

(d) Materials other than wood used for support shall have support strength at least equivalent to wooden material meeting the applicable provisions of this section.

(e) Posts and jacks shall be tightly installed on solid footing.

(f) When posts are installed under roof susceptible to sloughing a cap block, plank, crossbar or materials that are equally effective shall be placed between the post and the roof.

(g) Blocks used for lagging between the roof and crossbars shall be spaced to distribute the load.

(h) Jacks used for roof support shall be used with at least 36 square inches of roof bearing surface.

[53 FR 2375, Jan. 27, 1988, as amended at 55 FR 14228, Apr. 16, 1990; 55 FR 20137, May 15, 1990]

§ 75.207 Pillar recovery.

Pillar recovery shall be conducted in the following manner, unless otherwise specified in the roof control plan:

(a) Full and partial pillar recovery shall not be conducted on the same pillar line, except where physical conditions such as unstable floor or roof, falls of roof, oil and gas well barriers or surface subsidence require that pillars be left in place.

(b) Before mining is started in a pillar split or lift—

(1) At least two rows of breaker posts or equivalent support shall be installed—

(i) As close to the initial intended breakline as practicable; and

(ii) Across each opening leading into an area where full or partial pillar extraction has been completed.

(2) A row of roadside-radius (turn) posts or equivalent support shall be installed leading into the split or lift.

(c) Before mining is started on a final stump—

(1) At least 2 rows of posts or equivalent support shall be installed on not more than 4-foot centers on each side of the roadway; and

(2) Only one open roadway, which shall not exceed 16 feet wide, shall lead from solid pillars to the final stump of a pillar. Where posts are used as the sole means of roof support, the width of the roadway shall not exceed 14 feet.

(d) During open-end pillar extraction, at least 2 rows of breaker posts or equivalent support shall be installed on not more than 4-foot centers. These supports shall be installed between the lift to be started and the area where pillars have been extracted. These supports shall be maintained to within 7 feet of the face and the width of the roadway shall not exceed 16 feet. Where posts are used as the sole means of roof support, the width of the roadway shall not exceed 14 feet.

§ 75.208 Warning devices.

Except during the installation of roof supports, the end of permanent roof support shall be posted with a readily visible warning, or a physical barrier shall be installed to impede travel beyond permanent support.

§ 75.209 Automated Temporary Roof Support (ATRS) systems.

(a) Except in anthracite mines and as specified in paragraphs (b) and (c) of this section, an ATRS system shall be used with roof bolting machines and continuous-mining machines with integral roof bolters operated in a working section. The requirements of this paragraph shall be met according to the following schedule:

(1) All new machines ordered after March 28, 1988.

(2) All existing machines operated in mining heights of 36 inches or more after March 28, 1989; and

(3) All existing machines operated in mining heights of 30 inches or more but less than 36 inches after March 28, 1990.

(b) After March 28, 1990 the use of ATRS systems with existing roof bolting machines and continuous-mining machines with integral roof bolters operated in a working section where the mining height is less than 30 inches shall be addressed in the roof control plan.

(c) Alternative means of temporary support shall be used, as specified in the roof control plan, when—

(1) Mining conditions or circumstances prevent the use of an ATRS system; or

(2) Temporary supports are installed in conjunction with an ATRS system.

(d) Persons shall work or travel between the support device of the ATRS system and another support, and the distance between the support device of the ATRS system and support to the left, right or beyond the ATRS system, shall not exceed 5 feet.

(e) Each ATRS system shall meet each of the following:

(1) The ATRS system shall elastically support a deadweight load measured in pounds of at least 450 times each square foot of roof intended to be supported, but in no case less than 11,250 pounds.

(2) The controls that position and set the ATRS system shall be—

(i) Operable from under permanently supported roof; or

(ii) Located in a compartment, which includes a deck, that provides the equipment operator with overhead and lateral protection, and has the structural capacity to elastically support a deadweight load of at least 18,000 pounds.

(3) All jacks affecting the capacity of the ATRS system and compartment shall have check valves or equivalent devices that will prevent rapid collapse in the event of a system failure.

(4) Except for the main tram controls, tram controls for positioning the equipment to set the ATRS system shall limit the speed of the equipment to a maximum of 80 feet-per-minute.

(f) The support capacity of each ATRS system and the structural capacity of each compartment shall be certified by a registered engineer as meeting the applicable requirements of paragraphs (e)(1) and (e)(2) of this section. The certifications shall be made available to an authorized representative of the Secretary and representative of the miners.

§ 75.210 Manual installation of temporary support.

(a) When manually installing temporary support, only persons engaged in installing the support shall proceed beyond permanent support.

(b) When manually installing temporary supports, the first temporary support shall be set no more than 5 feet from a permanent roof support and the rib. All temporary supports shall be set so that the person installing the supports remains between the temporary support being set and two other supports which shall be no more than 5 feet from the support being installed. Each temporary support shall be completely installed prior to installing the next temporary support.

(c) All temporary supports shall be placed on no more than 5-foot centers.

(d) Once temporary supports have been installed, work or travel beyond permanent roof support shall be done between temporary supports and the nearest permanent support or between other temporary supports.

§ 75.211 Roof testing and scaling.

(a) A visual examination of the roof, face and ribs shall be made immediately before any work is started in an area and thereafter as conditions warrant.

(b) Where the mining height permits and the visual examination does not disclose a hazardous condition, sound and vibration roof tests, or other equivalent tests, shall be made where supports are to be installed. When sound and vibration tests are made, they shall be conducted—

(1) After the ATRS system is set against the roof and before other support is installed; or

(2) Prior to manually installing a roof support. This test shall begin under supported roof and progress no further than the location where the next support is to be installed.

(c) When a hazardous roof, face, or rib condition is detected, the condition shall be corrected before there is any other work or travel in the affected area. If the affected area is left unattended, each entrance to the area shall be posted with a readily visible warning, or a physical barrier shall be installed to impede travel into the area.

(d) A bar for taking down loose material shall be available in the working place or on all face equipment except haulage equipment. Bars provided for taking down loose material shall be of a length and design that will allow the removal of loose material from a position that will not expose the person performing this work to injury from falling material.

§ 75.212 Rehabilitation of areas with unsupported roof.

(a) Before rehabilitating each area where a roof fall has occurred or the roof has been removed by mining machines or by blasting—

(1) The mine operator shall establish the clean up and support procedures that will be followed;

(2) All persons assigned to perform rehabilitation work shall be instructed in the clean-up and support procedures; and

(3) Ineffective, damaged or missing roof support at the edge of the area to be rehabilitated shall be replaced or other equivalent support installed.

(b) All persons who perform rehabilitation work shall be experienced in this work or they shall be supervised by a person experienced in rehabilitation work who is designated by the mine operator.

(c) Where work is not being performed to rehabilitate an area in active workings where a roof fall has occurred or the roof has been removed by mining machines or by blasting, each entrance to the area shall be supported by at least one row of posts on not more than 5-foot centers, or equally effective support.

§ 75.213 Roof support removal.

(a)(1) All persons who perform the work of removing permanent roof supports shall be supervised by a management person experienced in removing roof supports.

(2) Only persons with at least one year of underground mining experience shall perform permanent roof support removal work.

(b) Prior to the removal of permanent roof supports, the person supervising roof support removal in accordance with paragraph (a)(1) of this section shall examine the roof conditions in the area where the supports are to be removed and designate each support to be removed.

(c)(1) Except as provided in paragraph (g) of this section, prior to the removal of permanent supports, a row of temporary supports on no more than 5-foot centers or equivalent support shall be installed across the opening within 4 feet of the supports being removed. Additional supports shall be installed where necessary to assure safe removal.

(2) Prior to the removal of roof bolts, temporary support shall be installed as close as practicable to each roof bolt being removed.

(d) Temporary supports installed in accordance with this section shall not be removed unless—

(1) Removal is done by persons who are in a remote location under supported roof; and

(2) At least two rows of temporary supports, set across the opening on no more than 5-foot centers, are maintained between the miners and the unsupported area.

(e) Each entrance to an area where supports have been removed shall be posted with a readily visible warning or a physical barrier shall be installed to impede travel into the area.

(f) Except as provided in paragraph (g) of this section, permanent support shall not be removed where—

(1) Roof bolt torque or tension measurements or the condition of conventional support indicate excessive loading;

(2) Roof fractures are present;

(3) There is any other indication that the roof is structurally weak; or

(4) Pillar recovery has been conducted.

(g) Permanent supports may be removed provided that:

(1) Removal is done by persons who are in a remote location under supported roof; and

(2) At least two rows of temporary supports, set across the opening on no more than 5-foot centers, are maintained between the miners and the unsupported area.

(h) The provisions of this section do not apply to removal of conventional supports for starting crosscuts and pillar splits or lifts except that prior to the removal of these supports an examination of the roof conditions shall be made.

[55 FR 4595, Feb. 8, 1990]

§ 75.214 Supplemental support materials, equipment and tools.

(a) A supply of supplementary roof support materials and the tools and equipment necessary to install the materials shall be available at a readily accessible location on each working section or within four crosscuts of each working section.

(b) The quantity of support materials and tools and equipment maintained available in accordance with this section shall be sufficient to support the roof if adverse roof conditions are encountered, or in the event of an accident involving a fall.

§ 75.215 Longwall mining systems.

For each longwall mining section, the roof control plan shall specify—

(a) The methods that will be used to maintain a safe travelway out of the section through the tailgate side of the longwall; and

(b) The procedures that will be followed if a ground failure prevents travel out of the section through the tailgate side of the longwall.

§ 75.220 Roof control plan.

(a)(1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine. Additional measures shall be taken to protect persons if unusual hazards are encountered.

(2) The proposed roof control plan and any revisions to the plan shall be submitted, in writing, to the District Manager. When revisions to a roof control plan are proposed, only the revised pages need to be submitted unless otherwise specified by the District Manager.

(b)(1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision.

(2) When approval of a proposed plan or revision is denied, the deficiencies of the plan or revision and recommended changes will be specified and the mine operator will be afforded an opportunity to discuss the deficiencies and changes with the District Manager.

(3) Before new support materials, devices or systems other than roof bolts and accessories, are used as the only means of roof support, the District Manager may require that their effectiveness be demonstrated by experimental installations.

(c) No proposed roof control plan or revision to a roof control plan shall be implemented before it is approved.

(d) Before implementing an approved revision to a roof control plan, all persons who are affected by the revision shall be instructed in its provisions.

(e) The approved roof control plan and any revisions shall be available to the miners and representative of miners at the mine.

[53 FR 2375, Jan. 27, 1988; 53 FR 11395, Apr. 6, 1988, as amended at 60 FR 33723, June 29, 1995; 71 FR 16668, Apr. 3, 2006]

§ 75.221 Roof control plan information.

(a) The following information shall be included in each roof control plan:

(1) The name and address of the company.

(2) The name, address, mine identification number and location of the mine.

(3) The name and title of the company official responsible for the plan.

(4) A typical columnar section of the mine strata which shall—

(i) Show the name and the thickness of the coalbed to be mined and any persistent partings;

(ii) Identify the type and show the thickness of each stratum up to and including the main roof above the coalbed and for distance of at least 10 feet below the coalbed; and

(iii) Indicate the maximum cover over the area to be mined.

(5) A description and drawings of the sequence of installation and spacing of supports for each method of mining used.

(6) When an ATRS system is used, the maximum distance that an ATRS system is to be set beyond the last row of permanent support.

(7) When tunnel liners or arches are to be used for roof support, specifications and installation procedures for the liners or arches.

(8) Drawings indicating the planned width of openings, size of pillars, method of pillar recovery, and the sequence of mining pillars.

(9) A list of all support materials required to be used in the roof, face and rib control system, including, if roof bolts are to be installed—

(i) The length, diameter, grade and type of anchorage unit to be used;

(ii) The drill hole size to be used; and

(iii) The installed torque or tension range for tensioned roof bolts.

(10) When mechanically anchored tensioned roof bolts are used, the intervals at which test holes will be drilled.

(11) A description of the method of protecting persons—

(i) From falling material at drift openings; and

(ii) When mining approaches within 150 feet of an outcrop.

(12) A description of the roof and rib support necessary for the refuge alternatives.

(b) Each drawing submitted with a roof control plan shall contain a legend explaining all symbols used and shall specify the scale of the drawing which shall not be less than 5 feet to the inch or more than 20 feet to the inch.

(c) All roof control plan information, including drawings, shall be submitted on 8 1/2 by 11 inch paper, or paper folded to this size.

[53 FR 2375, Jan. 27, 1988, as amended at 60 FR 33723, June 29, 1995; 73 FR 80697, Dec. 31, 2008]

§ 75.222 Roof control plan-approval criteria.

(a) This section sets forth the criteria that shall be considered on a mine-by-mine basis in the formulation and approval of roof control plans and revisions. Additional measures may be required in plans by the District Manager. Roof control plans that do not conform to the applicable criteria in this section may be approved by the District Manager, provided that effective control of the roof, face and ribs can be maintained.

(b) Roof Bolting. (1) Roof bolts should be installed on centers not exceeding 5 feet lengthwise and crosswise, except as specified in § 75.205.

(2) When tensioned roof bolts are used as a means of roof support, the torque or tension range should be capable of supporting roof bolt loads of at least 50 percent of either the yield point of the bolt or anchorage capacity of the strata, whichever is less.

(3) Any opening that is more than 20 feet wide should be supported by a combination of roof bolts and conventional supports.

(4) In any opening more than 20 feet wide—

(i) Posts should be installed to limit each roadway to 16 feet wide where straight and 18 feet wide where curved; and

(ii) A row of posts should be set for each 5 feet of space between the roadway posts and the ribs.

(5) Openings should not be more than 30 feet wide.

(c) Installation of roof support using mining machines with integral roof bolters. (1) Before an intersection or pillar split is started, roof bolts should be installed on at least 5-foot centers where the work is performed.

(2) Where the roof is supported by only two roof bolts crosswise, openings should not be more than 16 feet wide.

(d) Pillar recovery. (1) During development, any dimension of a pillar should be at least 20 feet.

(2) Pillar splits and lifts should not be more than 20 feet wide.

(3) Breaker posts should be installed on not more than 4-foot centers.

(4) Roadside-radius (turn) posts, or equivalent support, should be installed on not more than 4-foot centers leading into each pillar split or lift.

(5) Before full pillar recovery is started in areas where roof bolts are used as the only means of roof support and openings are more than 16 feet wide, at least one row of posts should be installed to limit the roadway width to 16 feet. These posts should be—

(i) Extended from the entrance to the split through the intersection outby the pillar in which the split or lift is being made; and

(ii) Spaced on not more than 5-foot centers.

(e) Unsupported openings at intersections. Openings that create an intersection should be permanently supported or at least one row of temporary supports should be installed on not more than 5-foot centers across the opening before any other work or travel in the intersection.

(f) ATRS systems in working sections where the mining height is below 30 inches. In working sections where the mining height is below 30 inches, an ATRS system should be used to the extent practicable during the installation of roof bolts with roof bolting machines and continuous-mining machines with integral roof bolters.

(g) Longwall mining systems. (1) Systematic supplemental support should be installed throughout—

(i) The tailgate entry of the first longwall panel prior to any mining; and

(ii) In the proposed tailgate entry of each subsequent panel in advance of the frontal abutment stresses of the panel being mined.

(2) When a ground failure prevents travel out of the section through the tailgate side of the longwall section, the roof control plan should address—

(i) Notification of miners that the travelway is blocked;

(ii) Re-instruction of miners regarding escapeways and escape procedures in the event of an emergency;

(iii) Re-instruction of miners on the availability and use of self-contained self-rescue devices;

(iv) Monitoring and evaluation of the air entering the longwall section;

(v) Location and effectiveness of the two-way communication systems; and

(vi) A means of transportation from the section to the main line.

(3) The plan provisions addressed by paragraph (g)(2) of this section should remain in effect until a travelway is reestablished on the tailgate side of a longwall section.

§ 75.223 Evaluation and revision of roof control plan.

(a) Revisions of the roof control plan shall be proposed by the operator—

(1) When conditions indicate that the plan is not suitable for controlling the roof, face, ribs, or coal or rock bursts; or

(2) When accident and injury experience at the mine indicates the plan is inadequate. The accident and injury experience at each mine shall be reviewed at least every six months.

(b) Each unplanned roof fall and rib fall and coal or rock burst that occurs in the active workings shall be plotted on a mine map if it—

(1) Is above the anchorage zone where roof bolts are used;

(2) Impairs ventilation;

(3) Impedes passage of persons;

(4) Causes miners to be withdrawn from the area affected; or

(5) Disrupts regular mining activities for more than one hour.

(c) The mine map on which roof falls are plotted shall be available at the mine site for inspection by authorized representatives of the Secretary and representatives of miners at the mine.

(d) The roof control plan for each mine shall be reviewed every six months by an authorized representative of the Secretary. This review shall take into consideration any falls of the roof, face and ribs and the adequacy of the support systems used at the time.

[53 FR 2375, Jan. 27, 1988; 60 FR 33723, June 29, 1995]

Subpart D Ventilation

Authority: 30 U.S.C. 811, 863.

Source: 61 FR 9829, Mar. 11, 1996, unless otherwise noted.

§ 75.300 Scope.

This subpart sets requirements for underground coal mine ventilation.

§ 75.301 Definitions.

In addition to the applicable definitions in § 75.2, the following definitions apply in this subpart.

Air course. An entry or a set of entries separated from other entries by stoppings, overcasts, other ventilation control devices, or by solid blocks of coal or rock so that any mixing of air currents between each is limited to leakage.

AMS operator. The person(s), designated by the mine operator, who is located on the surface of the mine and monitors the malfunction, alert, and alarm signals of the AMS and notifies appropriate personnel of these signals.

Appropriate personnel. The person or persons designated by the operator to perform specific tasks in response to AMS signals. Appropriate personnel include the responsible person(s) required by § 75.1501 when an emergency evacuation is necessary.

Atmospheric Monitoring System (AMS). A network consisting of hardware and software meeting the requirements of §§ 75.351 and 75.1103-2 and capable of: measuring atmospheric parameters; transmitting the measurements to a designated surface location; providing alert and alarm signals; processing and cataloging atmospheric data; and, providing reports. Early-warning fire detection systems using newer technology that provides equal or greater protection, as determined by the Secretary, will be considered atmospheric monitoring systems for the purposes of this subpart.

Belt air course. The entry in which a belt is located and any adjacent entry(ies) not separated from the belt entry by permanent ventilation controls, including any entries in series with the belt entry, terminating at a return regulator, a section loading point, or the surface.

Carbon monoxide ambient level. The average concentration in parts per million (ppm) of carbon monoxide detected in an air course containing carbon monoxide sensors. This average concentration is representative of the composition of the mine atmosphere over a period of mining activity during non-fire conditions. Separate ambient levels may be established for different areas of the mine.

Incombustible. Incapable of being burned.

Intake air. Air that has not yet ventilated the last working place on any split of any working section, or any worked-out area, whether pillared or nonpillared.

Intrinsically safe. Incapable of releasing enough electrical or thermal energy under normal or abnormal conditions to cause ignition of a flammable mixture of methane or natural gas and air of the most easily ignitable composition.

Noncombustible structure or area. Describes a structure or area that will continue to provide protection against flame spread for at least 1 hour when subjected to a fire test incorporating an ASTM E119-88 time/temperature heat input, or equivalent. The publication ASTM E119-88 “Standard Test Methods for Fire Tests of Building Construction and Materials” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

Noncombustible material. Describes a material that, when used to construct a ventilation control, results in a control that will continue to serve its intended function for 1 hour when subjected to a fire test incorporating an ASTM E119-88 time/temperature heat input, or equivalent. The publication ASTM E119-88 “Standard Test Methods for Fire Tests of Building Construction and Materials” is incorporated by reference and may be inspected at any Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

Point feeding. The process of providing additional intake air to the belt air course from another intake air course through a regulator.

Return air. Air that has ventilated the last working place on any split of any working section or any worked-out area whether pillared or nonpillared. If air mixes with air that has ventilated the last working place on any split of any working section or any worked-out area, whether pillared or nonpillared, it is considered return air. For the purposes of § 75.507-1, air that has been used to ventilate any working place in a coal producing section or pillared area, or air that has been used to ventilate any working face if such air is directed away from the immediate return is return air. Notwithstanding the definition of intake air, for the purpose of ventilation of structures, areas or installations that are required by this subpart D to be ventilated to return air courses, and for ventilation of seals, other air courses may be designated as return air courses by the operator only when the air in these air courses will not be used to ventilate working places or other locations, structures, installations or areas required to be ventilated with intake air.

Worked-out area. An area where mining has been completed, whether pillared or nonpillared, excluding developing entries, return air courses, and intake air courses.

[61 FR 9829, Mar. 11, 1996; 61 FR 29288, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 69 FR 17526, Apr. 2, 2004; 71 FR 16668, Apr. 3, 2006; 80 FR 52990, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.302 Main mine fans.

Each coal mine shall be ventilated by one or more main mine fans. Booster fans shall not be installed underground to assist main mine fans except in anthracite mines. In anthracite mines, booster fans installed in the main air current or a split of the main air current may be used provided their use is approved in the ventilation plan.

§ 75.310 Installation of main mine fans.

(a) Each main mine fan shall be—

(1) Installed on the surface in an incombustible housing;

(2) Connected to the mine opening with incombustible air ducts;

(3) Equipped with an automatic device that gives a signal at the mine when the fan either slows or stops. A responsible person designated by the operator shall always be at a surface location at the mine where the signal can be seen or heard while anyone is underground. This person shall be provided with two-way communication with the working sections and work stations where persons are routinely assigned to work for the majority of a shift;

(4) Equipped with a pressure recording device or system. Mines permitted to shut down main mine fans under § 75.311 and which do not have a pressure recording device installed on main mine fans shall have until June 10, 1997 to install a pressure recording device or system on all main mine fans. If a device or system other than a circular pressure recorder is used to monitor main mine fan pressure, the monitoring device or system shall provide a continuous graph or continuous chart of the pressure as a function of time. At not more than 7-day intervals, a hard copy of the continuous graph or chart shall be generated or the record of the fan pressure shall be stored electronically. When records of fan pressure are stored electronically, the system used to store these records shall be secure and not susceptible to alteration and shall be capable of storing the required data. Records of the fan pressure shall be retained at a surface location at the mine for at least 1 year and be made available for inspection by authorized representatives of the Secretary and the representative of miners;

(5) Protected by one or more weak walls or explosion doors, or a combination of weak walls and explosion doors, located in direct line with possible explosive forces;

(6) Except as provided under paragraph (e) of this section, offset by at least 15 feet from the nearest side of the mine opening unless an alternative method of protecting the fan and its associated components is approved in the ventilation plan.

(b)(1) If an electric motor is used to drive a main mine fan, the motor shall operate from a power circuit independent of all mine power circuits.

(2) If an internal combustion engine is used to drive a main mine fan—

(i) The fuel supply shall be protected against fires and explosions;

(ii) The engine shall be installed in an incombustible housing and be equipped with a remote shut-down device;

(iii) The engine and the engine exhaust system shall be located out of direct line of the air current exhausting from the mine; and

(iv) The engine exhaust shall be vented to the atmosphere so that the exhaust gases do not contaminate the mine intake air current or any enclosure.

(c) If a main mine fan monitoring system is used under § 75.312, the system shall—

(1) Record, as described in paragraph (a)(4) the mine ventilating pressure;

(2) Monitor bearing temperature, revolutions per minute, vibration, electric voltage, and amperage;

(3) Provide a printout of the monitored parameters, including the mine ventilating pressure within a reasonable period, not to exceed the end of the next scheduled shift during which miners are underground; and

(4) Be equipped with an automatic device that signals when—

(i) An electrical or mechanical deficiency exists in the monitoring system; or

(ii) A sudden increase or loss in mine ventilating pressure occurs.

(5) Provide monitoring, records, printouts, and signals required by paragraphs (c)(1) through (c)(4) at a surface location at the mine where a responsible person designated by the operator is always on duty and where signals from the monitoring system can be seen or heard while anyone is underground. This person shall be provided with two-way communication with the working sections and work stations where persons are routinely assigned to work for the majority of a shift.

(d) Weak walls and explosion doors shall have cross-sectional areas at least equal to that of the entry through which the pressure from an explosion underground would be relieved. A weak wall and explosion door combination shall have a total cross-sectional area at least equal to that of the entry through which the pressure from an explosion underground would be relieved.

(e) If a mine fan is installed in line with an entry, a slope, or a shaft—

(1) The cross-sectional area of the pressure relief entry shall be at least equal to that of the fan entry;

(2) The fan entry shall be developed out of direct line with possible explosive forces;

(3) The coal or other solid material between the pressure relief entry and the fan entry shall be at least 2,500 square feet; and

(4) The surface opening of the pressure relief entry shall be not less than 15 feet nor more than 100 feet from the surface opening of the fan entry and from the underground intersection of the fan entry and pressure relief entry.

(f) In mines ventilated by multiple main mine fans, incombustible doors shall be installed so that if any main mine fan stops and air reversals through the fan are possible, the doors on the affected fan automatically close.

[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 20877, May 8, 1996]

§ 75.311 Main mine fan operation.

(a) Main mine fans shall be continuously operated, except as otherwise approved in the ventilation plan, or when intentionally stopped for testing of automatic closing doors and automatic fan signal devices, maintenance or adjustment of the fan, or to perform maintenance or repair work underground that cannot otherwise be made while the fan is operating.

(b) Except as provided in paragraph (c) of this section, when a main mine fan is intentionally stopped and the ventilating quantity provided by the fan is not maintained by a back-up fan system—

(1) Only persons necessary to evaluate the effect of the fan stoppage or restart, or to perform maintenance or repair work that cannot otherwise be made while the fan is operating, shall be permitted underground;

(2) Mechanized equipment shall be shut off before stopping the fan; and

(3) Electric power circuits entering underground areas of the mine shall be deenergized.

(c) When a back-up fan system is used that does not provide the ventilating quantity provided by the main mine fan, persons may be permitted in the mine and electric power circuits may be energized as specified in the approved ventilation plan.

(d) If an unusual variance in the mine ventilation pressure is observed, or if an electrical or mechanical deficiency of a main mine fan is detected, the mine foreman or equivalent mine official, or in the absence of the mine foreman or equivalent mine official, a designated certified person acting for the mine foreman or equivalent mine official shall be notified immediately, and appropriate action or repairs shall be instituted promptly.

(e) While persons are underground, a responsible person designated by the operator shall always be at a surface location where each main mine fan signal can be seen or heard.

(f) The area within 100 feet of main mine fans and intake air openings shall be kept free of combustible material, unless alternative precautions necessary to provide protection from fire or other products of combustion are approved in the ventilation plan.

(g) If multiple mine fans are used, the mine ventilation system shall be designed and maintained to eliminate areas without air movement.

(h) Any atmospheric monitoring system operated during fan stoppages shall be intrinsically safe.

§ 75.312 Main mine fan examinations and records.

(a) To assure electrical and mechanical reliability of main mine fans, each main mine fan and its associated components, including devices for measuring or recording mine ventilation pressure, shall be examined for proper operation by a trained person designated by the operator. Examinations of main mine fans shall be made at least once each day that the fan operates, unless a fan monitoring system is used. No examination is required on any day when no one, including certified persons, goes underground, except that an examination shall be completed prior to anyone entering the mine.

(b)(1) If a main mine fan monitoring system is used, a trained person designated by the operator shall—

(i) At least once each day review the data provided by the fan monitoring system to assure that the fan and the fan monitoring system are operating properly. No review is required on any day when no one, including certified persons, goes underground, except that a review of the data shall be performed prior to anyone entering the underground portion of the mine. Data reviewed should include the fan pressure, bearing temperature, revolutions per minute, vibration, electric voltage, and amperage; and

(ii) At least every 7 days—

(A) Test the monitoring system for proper operation; and

(B) Examine each main mine fan and its associated components to assure electrical and mechanical reliability of main mine fans.

(2) If the monitoring system malfunctions, the malfunction shall be corrected, or paragraph (a) of this section shall apply.

(c) At least every 31 days, the automatic fan signal device for each main mine fan shall be tested by stopping the fan. Only persons necessary to evaluate the effect of the fan stoppage or restart, or to perform maintenance or repair work that cannot otherwise be made while the fan is operating, shall be permitted underground. Notwithstanding the requirement of § 75.311(b)(3), underground power may remain energized during this test provided no one, including persons identified in § 75.311(b)(1), is underground. If the fan is not restarted within 15 minutes, underground power shall be deenergized and no one shall enter any underground area of the mine until the fan is restarted and an examination of the mine is conducted as described in § 75.360 (b) through (e) and the mine has been determined to be safe.

(d) At least every 31 days, the automatic closing doors in multiple main mine fan systems shall be tested by stopping the fan. Only persons necessary to evaluate the effect of the fan stoppage or restart, or to perform maintenance or repair work that cannot otherwise be made while the fan is operating, shall be permitted underground. Notwithstanding the provisions of § 75.311, underground power may remain energized during this test provided no one, including persons identified in § 75.311(b)(1), is underground. If the fan is not restarted within 15 minutes, underground power shall be deenergized and no one shall enter any underground area of the mine, until the fan is restarted and an examination of the mine is conducted as described in § 75.360 (b) through (e) and the mine has been determined to be safe.

(e) Circular main mine fan pressure recording charts shall be changed before the beginning of a second revolution.

(f)(1) Certification. Persons making main mine fan examinations shall certify by initials and date at the fan or another location specified by the operator that the examinations were made. Each certification shall identify the main mine fan examined.

(2) Persons reviewing data produced by a main mine fan monitoring system shall certify by initials and date on a printed copy of the data from the system that the review was completed. In lieu of certification on a copy of the data, the person reviewing the data may certify electronically that the review was completed. Electronic certification shall be by handwritten initials and date in a computer system so as to be secure and not susceptible to alteration.

(g)(1) Recordkeeping. By the end of the shift on which the examination is made, persons making main mine fan examinations shall record all uncorrected defects that may affect the operation of the fan that are not corrected by the end of that shift. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(2) When a fan monitoring system is used in lieu of the daily fan examination—

(i) The certified copies of data produced by fan monitoring systems shall be maintained separate from other computer-generated reports or data; and

(ii) A record shall be made of any fan monitoring system malfunctions, electrical or mechanical deficiencies in the monitoring system and any sudden increase or loss in mine ventilating pressure. The record shall be made by the end of the shift on which the review of the data is completed and shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(3) By the end of the shift on which the monthly test of the automatic fan signal device or the automatic closing doors is completed, persons making these tests shall record the results of the tests. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(h) Retention period. Records, including records of mine fan pressure and the certified copies of data produced by fan monitoring systems, shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

§ 75.313 Main mine fan stoppage with persons underground.

(a) If a main mine fan stops while anyone is underground and the ventilating quantity provided by the fan is not maintained by a back-up fan system—

(1) Electrically powered equipment in each working section shall be deenergized;

(2) Other mechanized equipment in each working section shall be shut off; and

(3) Everyone shall be withdrawn from the working sections and areas where mechanized mining equipment is being installed or removed.

(b) If ventilation is restored within 15 minutes after a main mine fan stops, certified persons shall examine for methane in the working places and in other areas where methane is likely to accumulate before work is resumed and before equipment is energized or restarted in these areas.

(c) If ventilation is not restored within 15 minutes after a main mine fan stops—

(1) Everyone shall be withdrawn from the mine;

(2) Underground electric power circuits shall be deenergized. However, circuits necessary to withdraw persons from the mine need not be deenergized if located in areas or haulageways where methane is not likely to migrate to or accumulate. These circuits shall be deenergized as persons are withdrawn; and

(3) Mechanized equipment not located on working sections shall be shut off. However, mechanized equipment necessary to withdraw persons from the mine need not be shut off if located in areas where methane is not likely to migrate to or accumulate.

(d)(1) When ventilation is restored—

(i) No one other than designated certified examiners shall enter any underground area of the mine until an examination is conducted as described in § 75.360(b) through (e) and the area has been determined to be safe. Designated certified examiners shall enter the underground area of the mine from which miners have been withdrawn only after the fan has operated for at least 15 minutes unless a longer period of time is specified in the approved ventilation plan.

(ii) Underground power circuits shall not be energized and nonpermissible mechanized equipment shall not be started or operated in an area until an examination is conducted as described in § 75.360(b) through (e) and the area has been determined to be safe, except that designated certified examiners may use nonpermissible transportation equipment in intake airways to facilitate the making of the required examination.

(2) If ventilation is restored to the mine before miners reach the surface, the miners may return to underground working areas only after an examination of the areas is made by a certified person and the areas are determined to be safe.

(e) Any atmospheric monitoring system operated during fan stoppages shall be intrinsically safe.

(f) Any electrical refuge alternative components exposed to the mine atmosphere shall be approved as intrinsically safe for use during fan stoppages. Any electrical refuge alternative components located inside the refuge alternative shall be either approved as intrinsically safe or approved as permissible for use during fan stoppages.

[61 FR 9829, Mar. 11, 1996, as amended at 73 FR 80697, Dec. 31, 2008]

§ 75.320 Air quality detectors and measurement devices.

(a) Tests for methane shall be made by a qualified person with MSHA approved detectors that are maintained in permissible and proper operating condition and calibrated with a known methane-air mixture at least once every 31 days.

(b) Tests for oxygen deficiency shall be made by a qualified person with MSHA approved oxygen detectors that are maintained in permissible and proper operating condition and that can detect 19.5 percent oxygen with an accuracy of ±0.5 percent. The oxygen detectors shall be calibrated at the start of each shift that the detectors will be used.

(c) Handheld devices that contain electrical components and that are used for measuring air velocity, carbon monoxide, oxides of nitrogen, and other gases shall be approved and maintained in permissible and proper operating condition.

(d) An oxygen detector approved by MSHA shall be used to make tests for oxygen deficiency required by the regulations in this part. Permissible flame safety lamps may only be used as a supplementary testing device.

(e) Maintenance of instruments required by paragraphs (a) through (d) of this section shall be done by persons trained in such maintenance.

§ 75.321 Air quality.

(a)(1) The air in areas where persons work or travel, except as specified in paragraph (a)(2) of this section, shall contain at least 19.5 percent oxygen and not more than 0.5 percent carbon dioxide, and the volume and velocity of the air current in these areas shall be sufficient to dilute, render harmless, and carry away flammable, explosive, noxious, and harmful gases, dusts, smoke, and fumes.

(2) The air in areas of bleeder entries and worked-out areas where persons work or travel shall contain at least 19.5 percent oxygen, and carbon dioxide levels shall not exceed 0.5 percent time weighted average and 3.0 percent short term exposure limit.

(b) Notwithstanding the provisions of § 75.322, for the purpose of preventing explosions from gases other than methane, the following gases shall not be permitted to accumulate in excess of the concentrations listed below:

(1) Carbon monoxide (CO)—2.5 percent

(2) Hydrogen (H2)—.80 percent

(3) Hydrogen sulfide (H2 S)—.80 percent

(4) Acetylene (C2 H2)—.40 percent

(5) Propane (C3 H8)—.40 percent

(6) MAPP (methyl-acetylene-propylene-propodiene)—.30 percent

§ 75.322 Harmful quantities of noxious gases.

Concentrations of noxious or poisonous gases, other than carbon dioxide, shall not exceed the threshold limit values (TLV) as specified and applied by the American Conference of Governmental Industrial Hygienists in “Threshold Limit Values for Substance in Workroom Air” (1972). Detectors or laboratory analysis of mine air samples shall be used to determine the concentrations of harmful, noxious, or poisonous gases. This incorporation by reference has been approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies are available from MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at every MSHA Coal Mine Safety and Health District Office. The material is available for examination at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

[80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.323 Actions for excessive methane.

(a) Location of tests. Tests for methane concentrations under this section shall be made at least 12 inches from the roof, face, ribs, and floor.

(b) Working places and intake air courses. (1) When 1.0 percent or more methane is present in a working place or an intake air course, including an air course in which a belt conveyor is located, or in an area where mechanized mining equipment is being installed or removed—

(i) Except intrinsically safe atmospheric monitoring systems (AMS), electrically powered equipment in the affected area shall be deenergized, and other mechanized equipment shall be shut off;

(ii) Changes or adjustments shall be made at once to the ventilation system to reduce the concentration of methane to less than 1.0 percent; and

(iii) No other work shall be permitted in the affected area until the methane concentration is less than 1.0 percent.

(2) When 1.5 percent or more methane is present in a working place or an intake air course, including an air course in which a belt conveyor is located, or in an area where mechanized mining equipment is being installed or removed—

(i) Everyone except those persons referred to in § 104(c) of the Act shall be withdrawn from the affected area; and

(ii) Except for intrinsically safe AMS, electrically powered equipment in the affected area shall be disconnected at the power source.

(c) Return air split. (1) When 1.0 percent or more methane is present in a return air split between the last working place on a working section and where that split of air meets another split of air, or the location at which the split is used to ventilate seals or worked-out areas changes or adjustments shall be made at once to the ventilation system to reduce the concentration of methane in the return air to less than 1.0 percent.

(2) When 1.5 percent or more methane is present in a return air split between the last working place on a working section and where that split of air meets another split of air, or the location where the split is used to ventilate seals or worked-out areas—

(i) Everyone except those persons referred to in § 104(c) of the Act shall be withdrawn from the affected area;

(ii) Other than intrinsically safe AMS, equipment in the affected area shall be deenergized, electric power shall be disconnected at the power source, and other mechanized equipment shall be shut off; and

(iii) No other work shall be permitted in the affected area until the methane concentration in the return air is less than 1.0 percent.

(d) Return air split alternative. (1) The provisions of this paragraph apply if—

(i) The quantity of air in the split ventilating the active workings is at least 27,000 cubic feet per minute in the last open crosscut or the quantity specified in the approved ventilation plan, whichever is greater;

(ii) The methane content of the air in the split is continuously monitored during mining operations by an AMS that gives a visual and audible signal on the working section when the methane in the return air reaches 1.5 percent, and the methane content is monitored as specified in § 75.351; and

(iii) Rock dust is continuously applied with a mechanical duster to the return air course during coal production at a location in the air course immediately outby the most inby monitoring point.

(2) When 1.5 percent or more methane is present in a return air split between a point in the return opposite the section loading point and where that split of air meets another split of air or where the split of air is used to ventilate seals or worked-out areas—

(i) Changes or adjustments shall be made at once to the ventilation system to reduce the concentration of methane in the return air below 1.5 percent;

(ii) Everyone except those persons referred to in § 104(c) of the Act shall be withdrawn from the affected area;

(iii) Except for intrinsically safe AMS, equipment in the affected area shall be deenergized, electric power shall be disconnected at the power source, and other mechanized equipment shall be shut off; and

(iv) No other work shall be permitted in the affected area until the methane concentration in the return air is less than 1.5 percent.

(e) Bleeders and other return air courses. The concentration of methane in a bleeder split of air immediately before the air in the split joins another split of air, or in a return air course other than as described in paragraphs (c) and (d) of this section, shall not exceed 2.0 percent.

§ 75.324 Intentional changes in the ventilation system.

(a) A person designated by the operator shall supervise any intentional change in ventilation that—

(1) Alters the main air current or any split of the main air current in a manner that could materially affect the safety or health of persons in the mine; or

(2) Affects section ventilation by 9,000 cubic feet per minute of air or more in bituminous or lignite mines, or 5,000 cubic feet per minute of air or more in anthracite mines.

(b) Intentional changes shall be made only under the following conditions:

(1) Electric power shall be removed from areas affected by the ventilation change and mechanized equipment in those areas shall be shut off before the ventilation change begins.

(2) Only persons making the change in ventilation shall be in the mine.

(3) Electric power shall not be restored to the areas affected by the ventilation change and mechanized equipment shall not be restarted until a certified person has examined these areas for methane accumulation and for oxygen deficiency and has determined that the areas are safe.

§ 75.325 Air quantity.

(a)(1) In bituminous and lignite mines the quantity of air shall be at least 3,000 cubic feet per minute reaching each working face where coal is being cut, mined, drilled for blasting, or loaded. When a greater quantity is necessary to dilute, render harmless, and carry away flammable, explosive, noxious, and harmful gases, dusts, smoke, and fumes, this quantity shall be specified in the approved ventilation plan. A minimum air quantity may be required to be specified in the approved ventilation plan for other working places or working faces.

(2) The quantity of air reaching the working face shall be determined at or near the face end of the line curtain, ventilation tubing, or other ventilation control device. If the curtain, tubing, or device extends beyond the last row of permanent roof supports, the quantity of air reaching the working face shall be determined behind the line curtain or in the ventilation tubing at or near the last row of permanent supports. When machine-mounted dust collectors are used in conjunction with blowing face ventilation systems, the quantity of air reaching the working face shall be determined with the dust collector turned off.

(3) If machine mounted dust collectors or diffuser fans are used, the approved ventilation plan shall specify the operating volume of the dust collector or diffuser fan.

(b) In bituminous and lignite mines, the quantity of air reaching the last open crosscut of each set of entries or rooms on each working section and the quantity of air reaching the intake end of a pillar line shall be at least 9,000 cubic feet per minute unless a greater quantity is required to be specified in the approved ventilation plan. This minimum also applies to sections which are not operating but are capable of producing coal by simply energizing the equipment on the section.

(c) In longwall and shortwall mining systems—

(1) The quantity of air shall be at least 30,000 cubic feet per minute reaching the working face of each longwall, unless the operator demonstrates that a lesser air quantity will maintain continual compliance with applicable methane and respirable dust standards. This lesser quantity shall be specified in the approved ventilation plan. A quantity greater than 30,000 cubic feet per minute may be required to be specified in the approved ventilation plan.

(2) The velocity of air that will be provided to control methane and respirable dust in accordance with applicable standards on each longwall or shortwall and the locations where these velocities will be provided shall be specified in the approved ventilation plan. The locations specified shall be at least 50 feet but no more than 100 feet from the headgate and tailgate, respectively.

(d) Ventilation shall be maintained during installation and removal of mechanized mining equipment. The approved ventilation plan shall specify the minimum quantity of air, the locations where this quantity will be provided and the ventilation controls required.

(e) In anthracite mines, the quantity of air shall be as follows:

(1) At least 1,500 cubic feet per minute reaching each working face where coal is being mined, unless a greater quantity is required to be specified in the approved ventilation plan.

(2) At least 5,000 cubic feet per minute passing through the last open crosscut in each set of entries or rooms and at the intake end of any pillar line, unless a greater quantity is required to be specified in the approved ventilation plan.

(3) When robbing areas where air currents cannot be controlled and air measurements cannot be obtained, the air shall have perceptible movement.

(f) The minimum ventilating air quantity for an individual unit of diesel-powered equipment being operated shall be at least that specified on the approval plate for that equipment. Such air quantity shall be maintained—

(1) In any working place where the equipment is being operated;

(2) At the section loading point during any shift the equipment is being operated on the working section;

(3) In any entry where the equipment is being operated outby the section loading point in areas of the mine developed on or after April 25, 1997;

(4) In any air course with single or multiple entries where the equipment is being operated outby the section loading point in areas of the mine developed prior to April 25, 1997; and

(5) At any other location required by the district manager and specified in the approved ventilation plan.

(g) The minimum ventilating air quantity where multiple units of diesel-powered equipment are operated on working sections and in areas where mechanized mining equipment is being installed or removed must be at least the sum of that specified on the approval plates of all the diesel-powered equipment on the working section or in the area where mechanized mining equipment is being installed or removed. The minimum ventilating air quantity shall be specified in the approved ventilation plan. For working sections such air quantity must be maintained—

(1) In the last open crosscut of each set of entries or rooms in each working section;

(2) In the intake, reaching the working face of each longwall; and

(3) At the intake end of any pillar line.

(h) The following equipment may be excluded from the calculations of ventilating air quantity under paragraph (g) if such equipment exclusion is approved by the district manager and specified in the ventilation plan:

(1) Self-propelled equipment meeting the requirements of § 75.1908(b);

(2) Equipment that discharges its exhaust into intake air that is coursed directly to a return air course;

(3) Equipment that discharges its exhaust directly into a return air course; and

(4) Other equipment having duty cycles such that the emissions would not significantly affect the exposure of miners.

(i) A ventilating air quantity that is less than what is required by paragraph (g) of this section may be approved by the district manager in the ventilation plan based upon the results of sampling that demonstrate that the lesser air quantity will maintain continuous compliance with applicable TLV ®'s.

(j) If during sampling required by § 70.1900(c) of this subchapter the ventilating air is found to contain concentrations of CO or NO2 in excess of the action level specified by § 70.1900(c), higher action levels may be approved by the district manager based on the results of sampling that demonstrate that a higher action level will maintain continuous compliance with applicable TLV ®'s. Action levels other than those specified in § 70.1900(c) shall be specified in the approved ventilation plan.

(k) As of November 25, 1997 the ventilating air quantity required where diesel-powered equipment is operated shall meet the requirements of paragraphs (f) through (j) of this section. Mine operators utilizing diesel-powered equipment in underground coal mines shall submit to the appropriate MSHA district manager a revised ventilation plan or appropriate amendments to the existing plan, in accordance with § 75.371, which implement the requirements of paragraphs (f) through (j) of this section.

[61 FR 9828, Mar. 11, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, June 10, 1996, as amended at 61 FR 55526, Oct. 25, 1996; 62 FR 34641, June 27, 1997; 79 FR 24987, May 1, 2014]

§ 75.326 Mean entry air velocity.

In exhausting face ventilation systems, the mean entry air velocity shall be at least 60 feet per minute reaching each working face where coal is being cut, mined, drilled for blasting, or loaded, and to any other working places as required in the approved ventilation plan. A lower mean entry air velocity may be approved in the ventilation plan if the lower velocity will maintain methane and respirable dust concentrations in accordance with the applicable levels. Mean entry air velocity shall be determined at or near the inby end of the line curtain, ventilation tubing, or other face ventilation control devices.

[61 FR 9828, Mar. 11, 1996; 61 FR 29288, June 10, 1996]

§ 75.327 Air courses and trolley haulage systems.

(a) In any mine opened on or after March 30, 1970, or in any new working section of a mine opened before that date, where trolley haulage systems are maintained and where trolley wires or trolley feeder wires are installed, an authorized representative of the Secretary shall require enough entries or rooms as intake air courses to limit the velocity of air currents in the haulageways to minimize the hazards of fires and dust explosions in the haulageways.

(b) Unless the district manager approves a higher velocity, the velocity of the air current in the trolley haulage entries shall be limited to not more than 250 feet per minute. A higher air velocity may be required to limit the methane content in these haulage entries or elsewhere in the mine to less than 1.0 percent and provide an adequate supply of oxygen.

§ 75.330 Face ventilation control devices.

(a) Brattice cloth, ventilation tubing and other face ventilation control devices shall be made of flame-resistant material approved by MSHA.

(b)(1) Ventilation control devices shall be used to provide ventilation to dilute, render harmless, and to carry away flammable, explosive, noxious, and harmful gases, dusts, smoke, and fumes—

(i) To each working face from which coal is being cut, mined, drilled for blasting, or loaded; and

(ii) To any other working places as required by the approved ventilation plan.

(2) These devices shall be installed at a distance no greater than 10 feet from the area of deepest penetration to which any portion of the face has been advanced unless an alternative distance is specified and approved in the ventilation plan. Alternative distances specified shall be capable of maintaining concentrations of respirable dust, methane, and other harmful gases, in accordance with the levels specified in the applicable sections of this chapter.

(c) When the line brattice or any other face ventilation control device is damaged to an extent that ventilation of the working face is inadequate, production activities in the working place shall cease until necessary repairs are made and adequate ventilation is restored.

[61 FR 9828, Mar. 11, 1996; 61 FR 29288, June 10, 1996]

§ 75.331 Auxiliary fans and tubing.

(a) When auxiliary fans and tubing are used for face ventilation, each auxiliary fan shall be—

(1) Permissible, if the fan is electrically operated;

(2) Maintained in proper operating condition;

(3) Deenergized or shut off when no one is present on the working section; and

(4) Located and operated to avoid recirculation of air.

(b) If a deficiency exists in any auxiliary fan system, the deficiency shall be corrected or the auxiliary fan shall be deenergized immediately.

(c) If the air passing through an auxiliary fan or tubing contains 1.0 percent or more methane, power to electrical equipment in the working place and to the auxiliary fan shall be deenergized, and other mechanized equipment in the working place shall be shut off until the methane concentration is reduced to less than 1.0 percent.

(d) When an auxiliary fan is stopped—

(1) Line brattice or other face ventilation control devices shall be used to maintain ventilation to affected faces; and

(2) Electrical equipment in the affected working places shall be disconnected at the power source, and other mechanized equipment shall be shut off until ventilation to the working place is restored.

§ 75.332 Working sections and working places.

(a)(1) Each working section and each area where mechanized mining equipment is being installed or removed, shall be ventilated by a separate split of intake air directed by overcasts, undercasts or other permanent ventilation controls.

(2) When two or more sets of mining equipment are simultaneously engaged in cutting, mining, or loading coal or rock from working places within the same working section, each set of mining equipment shall be on a separate split of intake air.

(3) For purposes of this section, a set of mining equipment includes a single loading machine, a single continuous mining machine, or a single longwall or shortwall mining machine.

(b)(1) Air that has passed through any area that is not examined under §§ 75.360, 75.361 or 75.364 of this subpart, or through an area where second mining has been done shall not be used to ventilate any working place. Second mining is intentional retreat mining where pillars have been wholly or partially removed, regardless of the amount of recovery obtained.

(2) Air that has passed by any opening of any unsealed area that is not examined under §§ 75.360, 75.361 or 75.364 of this subpart, shall not be used to ventilate any working place.

§ 75.333 Ventilation controls.

(a) For purposes of this section, “doors” include any door frames.

(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—

(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;

(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;

(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;

(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and

(5) In return air courses to direct air into adjacent worked-out areas.

(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:

(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.

(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.

(3) When not in use, personnel doors shall be closed.

(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.

(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:

(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.

(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.

(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.

(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.

(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.

(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.

(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.

[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.334 Worked-out areas and areas where pillars are being recovered.

(a) Worked-out areas where no pillars have been recovered shall be—

(1) Ventilated so that methane-air mixtures and other gases, dusts, and fumes from throughout the worked-out areas are continuously diluted and routed into a return air course or to the surface of the mine; or

(2) Sealed.

(b)(1) During pillar recovery a bleeder system shall be used to control the air passing through the area and to continuously dilute and move methane-air mixtures and other gases, dusts, and fumes from the worked-out area away from active workings and into a return air course or to the surface of the mine.

(2) After pillar recovery a bleeder system shall be maintained to provide ventilation to the worked-out area, or the area shall be sealed.

(c) The approved ventilation plan shall specify the following:

(1) The design and use of bleeder systems;

(2) The means to determine the effectiveness of bleeder systems;

(3) The means for adequately maintaining bleeder entries free of obstructions such as roof falls and standing water; and

(4) The location of ventilating devices such as regulators, stoppings and bleeder connectors used to control air movement through the worked-out area.

(d) If the bleeder system used does not continuously dilute and move methane-air mixtures and other gases, dusts, and fumes away from worked-out areas into a return air course or to the surface of the mine, or it cannot be determined by examinations or evaluations under § 75.364 that the bleeder system is working effectively, the worked-out area shall be sealed.

(e) Each mining system shall be designed so that each worked-out area can be sealed. The approved ventilation plan shall specify the location and the sequence of construction of proposed seals.

(f) In place of the requirements of paragraphs (a) and (b) of this section, for mines with a demonstrated history of spontaneous combustion, or that are located in a coal seam determined to be susceptible to spontaneous combustion, the approved ventilation plan shall specify the following:

(1) Measures to detect methane, carbon monoxide, and oxygen concentrations during and after pillar recovery, and in worked-out areas where no pillars have been recovered, to determine if the areas must be ventilated or sealed.

(2) Actions that will be taken to protect miners from the hazards of spontaneous combustion.

(3) If a bleeder system will not be used, the methods that will be used to control spontaneous combustion, accumulations of methane-air mixtures, and other gases, dusts, and fumes in the worked-out area.

§ 75.335 Seal strengths, design applications, and installation.

(a) Seal strengths. Seals constructed on or after October 20, 2008 shall be designed, constructed, and maintained to withstand—

(1)(i) At least 50-psi overpressure when the atmosphere in the sealed area is monitored and maintained inert and designed using a pressure-time curve with an instantaneous overpressure of at least 50 psi. A minimum overpressure of at least 50 psi shall be maintained for at least four seconds then released instantaneously.

(ii) Seals constructed to separate the active longwall panel from the longwall panel previously mined shall be designed using a pressure-time curve with a rate of pressure rise of at least 50 psi in 0.1 second. A minimum overpressure of at least 50 psi shall be maintained; or

(2)(i) Overpressures of at least 120 psi if the atmosphere in the sealed area is not monitored, is not maintained inert, the conditions in paragraphs (a)(3)(i) through (iii) of this section are not present, and the seal is designed using a pressure-time curve with an instantaneous overpressure of at least 120 psi. A minimum overpressure of 120 psi shall be maintained for at least four seconds then released instantaneously.

(ii) Seals constructed to separate the active longwall panel from the longwall panel previously mined shall be designed using a pressure-time curve with a rate of pressure rise of 120 psi in 0.25 second. A minimum overpressure of 120 psi shall be maintained; or

(3) Overpressures greater than 120 psi if the atmosphere in the sealed area is not monitored and is not maintained inert, and

(i) The atmosphere in the sealed area is likely to contain homogeneous mixtures of methane between 4.5 percent and 17.0 percent and oxygen exceeding 17.0 percent throughout the entire area;

(ii) Pressure piling could result in overpressures greater than 120 psi in the area to be sealed; or

(iii) Other conditions are encountered, such as the likelihood of a detonation in the area to be sealed.

(iv) Where the conditions in paragraphs (a)(3)(i), (ii), or (iii) of this section are encountered, the mine operator shall revise the ventilation plan to address the potential hazards. The plan shall include seal strengths sufficient to address such conditions.

(b) Seal design applications. Seal design applications from seal manufacturers or mine operators shall be in accordance with paragraph (b)(1) or (2) of this section and submitted for approval to MSHA's Office of Technical Support, Pittsburgh Safety and Health Technology Center, 626 Cochrans Mill Road, Building 151, Pittsburgh, PA 15236-3611.

(1) An engineering design application shall—

(i) Address gas sampling pipes, water drainage systems, methods to reduce air leakage, pressure-time curve, fire resistance characteristics, flame spread index, entry size, engineering design and analysis, elasticity of design, material properties, construction specifications, quality control, design references, and other information related to seal construction;

(ii) Be certified by a professional engineer that the design of the seal is in accordance with current, prudent engineering practices and is applicable to conditions in an underground coal mine; and

(iii) Include a summary of the installation procedures related to seal construction; or

(2) Each application based on full-scale explosion tests or equivalent means of physical testing shall address the following requirements to ensure that a seal can reliably meet the seal strength requirements:

(i) Certification by a professional engineer that the testing was done in accordance with current, prudent engineering practices for construction in a coal mine;

(ii) Technical information related to the methods and materials;

(iii) Supporting documentation;

(iv) An engineering analysis to address differences between the seal support during test conditions and the range of conditions in a coal mine; and

(v) A summary of the installation procedures related to seal construction.

(3) MSHA will notify the applicant if additional information or testing is required. The applicant shall provide this information, arrange any additional or repeat tests, and provide prior notification to MSHA of the location, date, and time of such test(s).

(4) MSHA will notify the applicant, in writing, whether the design is approved or denied. If the design is denied, MSHA will specify, in writing, the deficiencies of the application, or necessary revisions.

(5) Once the seal design is approved, the approval holder shall promptly notify MSHA, in writing, of all deficiencies of which they become aware.

(c) Seal installation approval. The installation of the approved seal design shall be subject to approval in the ventilation plan. The mine operator shall—

(1) Retain the seal design approval and installation information for as long as the seal is needed to serve the purpose for which it was built.

(2) Designate a professional engineer to conduct or have oversight of seal installation and certify that the provisions in the approved seal design specified in this section have been addressed and are applicable to conditions at the mine. A copy of the certification shall be submitted to the District Manager with the information provided in paragraph (c)(3) of this section and a copy of the certification shall be retained for as long as the seal is needed to serve the purpose for which it was built.

(3) Provide the following information for approval in the ventilation plan—

(i) The MSHA Technical Support Approval Number;

(ii) A summary of the installation procedures;

(iii) The mine map of the area to be sealed and proposed seal locations that include the deepest points of penetration prior to sealing. The mine map shall be certified by a professional engineer or a professional land surveyor.

(iv) Specific mine site information, including—

(A) Type of seal;

(B) Safety precautions taken prior to seal achieving design strength;

(C) Methods to address site-specific conditions that may affect the strength and applicability of the seal including set-back distances;

(D) Site preparation;

(E) Sequence of seal installations;

(F) Projected date of completion of each set of seals;

(G) Supplemental roof support inby and outby each seal;

(H) Water flow estimation and dimensions of the water drainage system through the seals;

(I) Methods to ventilate the outby face of seals once completed;

(J) Methods and materials used to maintain each type of seal;

(K) Methods to address shafts and boreholes in the sealed area;

(L) Assessment of potential for overpressures greater than 120 psi in sealed area;

(M) Additional sampling locations; and

(N) Additional information required by the District Manager.

[73 FR 21206, Apr. 18, 2008, as amended at 80 FR 52982, Sept. 2, 2015]

§ 75.336 Sampling and monitoring requirements.

(a) A certified person as defined in § 75.100 shall monitor atmospheres of sealed areas. Sealed areas shall be monitored, whether ingassing or outgassing, for methane and oxygen concentrations and the direction of leakage.

(1) Each sampling pipe and approved sampling location shall be sampled at least every 24 hours.

(i) Atmospheres with seals of 120 psi or greater shall be sampled until the design strength is reached for every seal used to seal the area.

(ii) Atmospheres with seals less than 120 psi constructed before October 20, 2008 shall be monitored for methane and oxygen concentrations and maintained inert. The operator may request that the District Manager approve different sampling locations and frequencies in the ventilation plan, provided at least one sample is taken at each set of seals at least every 7 days.

(iii) Atmospheres with seals less than 120 psi constructed after October 20, 2008 shall be monitored for methane and oxygen concentrations and maintained inert. The operator may request that the District Manager approve different sampling locations and frequencies in the ventilation plan after a minimum of 14 days and after the seal design strength is reached, provided at least one sample is taken at each set of seals at least every 7 days.

(2) The mine operator shall evaluate the atmosphere in the sealed area to determine whether sampling through the sampling pipes in seals and approved locations provides appropriate sampling locations of the sealed area. The mine operator shall make the evaluation immediately after the minimum 14-day required sampling, if the mine ventilation system is reconfigured, if changes occur that adversely affect the sealed area, or if the District Manager requests an evaluation. When the results of the evaluations indicate the need for additional sampling locations, the mine operator shall provide the additional locations and have them approved in the ventilation plan. The District Manager may require additional sampling locations and frequencies in the ventilation plan.

(3) Mine operators with an approved ventilation plan addressing spontaneous combustion pursuant to § 75.334(f) shall sample the sealed atmosphere in accordance with the ventilation plan.

(4) The District Manager may approve in the ventilation plan the use of a continuous monitoring system in lieu of monitoring provisions in this section.

(b)(1) Except as provided in § 75.336(d), the atmosphere in the sealed area is considered inert when the oxygen concentration is less than 10.0 percent or the methane concentration is less than 3.0 percent or greater than 20.0 percent.

(2) Immediate action shall be taken by the mine operator to restore an inert sealed atmosphere behind seals with strengths less than 120 psi. Until the atmosphere in the sealed area is restored to an inert condition, the sealed atmosphere shall be monitored at each sampling pipe and approved location at least once every 24 hours.

(c) Except as provided in § 75.336(d), when a sample is taken from the sealed atmosphere with seals of less than 120 psi and the sample indicates that the oxygen concentration is 10 percent or greater and methane is between 4.5 percent and 17 percent, the mine operator shall immediately take an additional sample and then immediately notify the District Manager. When the additional sample indicates that the oxygen concentration is 10 percent or greater and methane is between 4.5 percent and 17 percent, persons shall be withdrawn from the affected area which is the entire mine or other affected area identified by the operator and approved by the District Manager in the ventilation plan, except those persons referred to in § 104(c) of the Act. The operator may identify areas in the ventilation plan to be approved by the District Manager where persons may be exempted from withdrawal. The operator's request shall address the location of seals in relation to: Areas where persons work and travel in the mine; escapeways and potential for damage to the escapeways; and ventilation systems and controls in areas where persons work or travel and where ventilation is used for escapeways. The operator's request shall also address the gas concentration of other sampling locations in the sealed area and other required information. Before miners reenter the mine, the mine operator shall have a ventilation plan revision approved by the District Manager specifying the actions to be taken.

(d) In sealed areas with a demonstrated history of carbon dioxide or sealed areas where inert gases have been injected, the operator may request that the District Manager approve in the ventilation plan an alternative method to determine if the sealed atmosphere is inert and when miners have to be withdrawn. The mine operator shall address in the ventilation plan the specific levels of methane, carbon dioxide, nitrogen and oxygen; the sampling methods and equipment used; and the methods to evaluate these concentrations underground at the seal.

(e) Recordkeeping. (1) The certified person shall promptly record each sampling result including the location of the sampling points, whether ingassing or outgassing, and oxygen and methane concentrations. The results of oxygen and methane samples shall be recorded as the percentage of oxygen and methane measured by the certified person and any hazardous condition found in accordance with § 75.363.

(2) The mine operator shall retain sampling records at the mine for at least one year from the date of the sampling.

[73 FR 21207, Apr. 18, 2008; 73 FR 27730, May 14, 2008]

§ 75.337 Construction and repair of seals.

(a) The mine operator shall maintain and repair seals to protect miners from hazards of sealed areas.

(b) Prior to sealing, the mine operator shall—

(1) Remove insulated cables, batteries, and other potential electric ignition sources from the area to be sealed when constructing seals, unless it is not safe to do so. If ignition sources cannot safely be removed, seals must be constructed to at least 120 psi;

(2) Remove metallic objects through or across seals; and

(3) Breach or remove all stoppings in the first crosscut inby the seals immediately prior to sealing the area.

(c) A certified person designated by the mine operator shall directly supervise seal construction and repair and—

(1) Examine each seal site immediately prior to construction or repair to ensure that the site is in accordance with the approved ventilation plan;

(2) Examine each seal under construction or repair during each shift to ensure that the seal is being constructed or repaired in accordance with the approved ventilation plan;

(3) Examine each seal upon completion of construction or repair to ensure that construction or repair is in accordance with the approved ventilation plan;

(4) Certify by initials, date, and time that the examinations were made; and

(5) Make a record of the examination at the completion of any shift during which an examination was conducted. The record shall include each deficiency and the corrective action taken. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be kept at the mine for one year.

(d) Upon completion of construction of each seal a senior mine management official, such as a mine manager or superintendent, shall certify that the construction, installation, and materials used were in accordance with the approved ventilation plan. The mine operator shall retain the certification for as long as the seal is needed to serve the purpose for which it was built.

(e) The mine operator shall—

(1) Notify the District Manager between two and fourteen days prior to commencement of seal construction;

(2) Notify the District Manager, in writing, within five days of completion of a set of seals and provide a copy of the certification required in paragraph (d) of this section; and

(3) Submit a copy of quality control results to the District Manager for seal material properties specified by § 75.335 within 30 days of completion of quality control tests.

(f) Welding, cutting, and soldering. Welding, cutting, and soldering with an arc or flame are prohibited within 150 feet of a seal. An operator may request a different location in the ventilation plan to be approved by the District Manager. The operator's request must address methods the mine operator will use to continuously monitor atmospheric conditions in the sealed area during welding or burning; the airflow conditions in and around the work area; the rock dust and water application methods; the availability of fire extinguishers on hand; the procedures to maintain safe conditions, and other relevant factors.

(g) Sampling pipes. (1) For seals constructed after April 18, 2008, one non-metallic sampling pipe shall be installed in each seal that shall extend into the center of the first connecting crosscut inby the seal. If an open crosscut does not exist, the sampling pipe shall extend one-half of the distance of the open entry inby the seal.

(2) Each sampling pipe shall be equipped with a shut-off valve and appropriate fittings for taking gas samples.

(3) The sampling pipes shall be labeled to indicate the location of the sampling point when more than one sampling pipe is installed through a seal.

(4) If a new seal is constructed to replace or reinforce an existing seal with a sampling pipe, the sampling pipe in the existing seal shall extend through the new seal. An additional sampling pipe shall be installed through each new seal to sample the area between seals, as specified in the approved ventilation plan.

(h) Water drainage system. For each set of seals constructed after April 18, 2008, the seal at the lowest elevation shall have a corrosion-resistant, non-metallic water drainage system. Seals shall not impound water or slurry. Water or slurry shall not accumulate within the sealed area to any depth that can adversely affect a seal.

[73 FR 21207, Apr. 18, 2008]

§ 75.338 Training.

(a) Certified persons conducting sampling shall be trained in the use of appropriate sampling equipment, procedures, location of sampling points, frequency of sampling, size and condition of the sealed area, and the use of continuous monitoring systems if applicable before they conduct sampling, and annually thereafter. The mine operator shall certify the date of training provided to certified persons and retain each certification for two years.

(b) Miners constructing or repairing seals, designated certified persons, and senior mine management officials shall be trained prior to constructing or repairing a seal and annually thereafter. The training shall address materials and procedures in the approved seal design and ventilation plan. The mine operator shall certify the date of training provided each miner, certified person, and senior mine management official and retain each certification for two years.

[73 FR 21208, Apr. 18, 2008]

§ 75.339 Seals records.

(a) The table entitled “Seal Recordkeeping Requirements” lists records the operator shall maintain and the retention period for each record.

Table—§ 75.339(a) Seal Recordkeeping Requirements

Record | Section reference | Retention time

(1) Approved seal design | 75.335(c)(1) | As long as the seal is needed to serve the purpose for which it is built.

(2) Certification of Provisions of Approved Seal Design is Addressed | 75.335(c)(2) | As long as the seal is needed to serve the purpose for which it is built.

(3) Gas sampling records | 75.336(e)(2) | 1 year.

(4) Record of examinations | 75.337(c)(5) | 1 year.

(5) Certification of seal construction, installation, and materials | 75.337(d) | As long as the seal is needed to serve the purpose for which it is built.

(6) Certification of Training for Persons that Sample | 75.338(a) | 2 years.

(7) Certification of Training for Persons that Perform Seal Construction and Repair | 75.338(b) | 2 years.

(b) Records required by §§ 75.335, 75.336, 75.337 and 75.338 shall be retained at a surface location at the mine in a secure book that is not susceptible to alteration. The records may be retained electronically in a computer system that is secure and not susceptible to alteration, if the mine operator can immediately access the record from the mine site.

(c) Upon request from an authorized representative of the Secretary of Labor, the Secretary of Health and Human Services, or from the authorized representative of miners, mine operators shall promptly provide access to any record listed in the table in this section.

(d) Whenever an operator ceases to do business or transfers control of the mine to another entity, that operator shall transfer all records required to be maintained by this part, or a copy thereof, to any successor operator who shall maintain them for the required period.

[73 FR 21208, Apr. 18, 2008]

§ 75.340 Underground electrical installations.

(a) Underground transformer stations, battery charging stations, substations, rectifiers, and water pumps shall be housed in noncombustible structures or areas or be equipped with a fire suppression system meeting the requirements of § 75.1107-3 through § 75.1107-16.

(1) When a noncombustible structure or area is used, these installations shall be—

(i) Ventilated with intake air that is coursed into a return air course or to the surface and that is not used to ventilate working places; or

(ii) Ventilated with intake air that is monitored for carbon monoxide or smoke by an AMS installed and operated according to § 75.351. Monitoring of intake air ventilating battery charging stations shall be done with sensors not affected by hydrogen; or

(iii) Ventilated with intake air and equipped with sensors to monitor for heat and for carbon monoxide or smoke. Monitoring of intake air ventilating battery charging stations shall be done with sensors not affected by hydrogen. The sensors shall deenergize power to the installation, activate a visual and audible alarm located outside of and on the intake side of the enclosure, and activate doors that will automatically close when either of the following occurs:

(A) The temperature in the noncombustible structure reaches 165 °F; or

(B) The carbon monoxide concentration reaches 10 parts per million above the ambient level for the area, or the optical density of smoke reaches 0.022 per meter. At least every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known concentration of carbon monoxide and air sufficient to activate the closing door, or each smoke sensor shall be tested to determine that it functions correctly.

(2) When a fire suppression system is used, these installations shall be—

(i) Ventilated with intake air that is coursed into a return air course or to the surface and that is not used to ventilate working places; or

(ii) Ventilated with intake air that is monitored for carbon monoxide or smoke by an AMS installed and operated according to § 75.351. Monitoring of intake air ventilating battery charging stations shall be done with sensors not affected by hydrogen.

(b) This section does not apply to—

(1) Rectifiers and power centers with transformers that are either dry-type or contain nonflammable liquid, if they are located at or near the section and are moved as the working section advances or retreats;

(2) Submersible pumps;

(3) Permissible pumps and associated permissible switchgear;

(4) Pumps located on or near the section and that are moved as the working section advances or retreats;

(5) Pumps installed in anthracite mines; and

(6) Small portable pumps.

§ 75.341 Direct-fired intake air heaters.

(a) If any system used to heat intake air malfunctions, the heaters affected shall switch off automatically.

(b) Thermal overload devices shall protect the blower motor from overheating.

(c) The fuel supply shall turn off automatically if a flame-out occurs.

(d) Each heater shall be located or guarded to prevent contact by persons and shall be equipped with a screen at the inlet to prevent combustible materials from passing over the burner units.

(e) If intake air heaters use liquefied fuel systems—

(1) Hydrostatic relief valves installed on vaporizers and on storage tanks shall be vented; and

(2) Fuel storage tanks shall be located or protected to prevent fuel from leaking into the mine.

(f) Following any period of 8 hours or more during which a heater does not operate, the heater and its associated components shall be examined within its first hour of operation. Additionally, each heater and its components shall be examined at least once each shift that the heater operates. The examination shall include measurement of the carbon monoxide concentration at the bottom of each shaft, slope, or in the drift opening where air is being heated. The measurements shall be taken by a person designated by the operator or by a carbon monoxide sensor that is calibrated with a known concentration of carbon monoxide and air at least once every 31 days. When the carbon monoxide concentration at this location reaches 50 parts per million, the heater causing the elevated carbon monoxide level shall be shut down.

§ 75.342 Methane monitors.

(a)(1) MSHA approved methane monitors shall be installed on all face cutting machines, continuous miners, longwall face equipment, loading machines, and other mechanized equipment used to extract or load coal within the working place.

(2) The sensing device for methane monitors on longwall shearing machines shall be installed at the return air end of the longwall face. An additional sensing device also shall be installed on the longwall shearing machine, downwind and as close to the cutting head as practicable. An alternative location or locations for the sensing device required on the longwall shearing machine may be approved in the ventilation plan.

(3) The sensing devices of methane monitors shall be installed as close to the working face as practicable.

(4) Methane monitors shall be maintained in permissible and proper operating condition and shall be calibrated with a known air-methane mixture at least once every 31 days. To assure that methane monitors are properly maintained and calibrated, the operator shall:

(i) Use persons properly trained in the maintenance, calibration, and permissibility of methane monitors to calibrate and maintain the devices.

(ii) Maintain a record of all calibration tests of methane monitors. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(iii) Retain the record of calibration tests for 1 year from the date of the test. Records shall be retained at a surface location at the mine and made available for inspection by authorized representatives of the Secretary and the representative of miners.

(b)(1) When the methane concentration at any methane monitor reaches 1.0 percent the monitor shall give a warning signal.

(2) The warning signal device of the methane monitor shall be visible to a person who can deenergize electric equipment or shut down diesel-powered equipment on which the monitor is mounted.

(c) The methane monitor shall automatically deenergize electric equipment or shut down diesel-powered equipment on which it is mounted when—

(1) The methane concentration at any methane monitor reaches 2.0 percent; or

(2) The monitor is not operating properly.

[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996]

§ 75.343 Underground shops.

(a) Underground shops shall be equipped with an automatic fire suppression system meeting the requirements of § 75.1107-3 through § 75.1107-16, or be enclosed in a noncombustible structure or area.

(b) Underground shops shall be ventilated with intake air that is coursed directly into a return air course.

§ 75.344 Compressors.

(a) Except compressors that are components of equipment such as locomotives and rock dusting machines and compressors of less than 5 horsepower, electrical compressors including those that may start automatically shall be:

(1) Continuously attended by a person designated by the operator who can see the compressor at all times during its operation. Any designated person attending the compressor shall be capable of activating the fire suppression system and deenergizing or shutting-off the compressor in the event of a fire; or,

(2) Enclosed in a noncombustible structure or area which is ventilated by intake air coursed directly into a return air course or to the surface and equipped with sensors to monitor for heat and for carbon monoxide or smoke. The sensors shall deenergize power to the compressor, activate a visual and audible alarm located outside of and on the intake side of the enclosure, and activate doors to automatically enclose the noncombustible structure or area when either of the following occurs:

(i) The temperature in the noncombustible structure or area reaches 165 °F.

(ii) The carbon monoxide concentration reaches 10 parts per million above the ambient level for the area, or the optical density of smoke reaches 0.022 per meter. At least once every 31 days, sensors installed to monitor for carbon monoxide shall be calibrated with a known concentration of carbon monoxide and air sufficient to activate the closing door, and each smoke sensor shall be tested to determine that it functions correctly.

(b) Compressors, except those exempted in paragraph (a), shall be equipped with a heat activated fire suppression system meeting the requirements of 75.1107-3 through 75.1107-16.

(c) Two portable fire extinguishers or one extinguisher having at least twice the minimum capacity specified for a portable fire extinguisher in § 75.1100-1(e) shall be provided for each compressor.

(d) Notwithstanding the requirements of § 75.1107-4, upon activation of any fire suppression system used under paragraph (b) of this section, the compressor shall be automatically deenergized or automatically shut off.

[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996]

§ 75.350 Belt air course ventilation.

As of April 14, 2025:

(a) The belt air course must not be used as a return air course; and except as provided in paragraph (b) of this section, the belt air course must not be used to provide air to working sections or to areas where mechanized mining equipment is being installed or removed.

(1) The belt air course must be separated with permanent ventilation controls from return air courses and from other intake air courses except as provided in paragraph (c) of this section.

(2) Effective December 31, 2009, the air velocity in the belt entry must be at least 50 feet per minute. When requested by the mine operator, the district manager may approve lower velocities in the ventilation plan based on specific mine conditions. Air velocities must be compatible with all fire detection systems and fire suppression systems used in the belt entry.

(b) The use of air from a belt air course to ventilate a working section, or an area where mechanized mining equipment is being installed or removed, shall be permitted only when evaluated and approved by the district manager in the mine ventilation plan. The mine operator must provide justification in the plan that the use of air from a belt entry would afford at least the same measure of protection as where belt haulage entries are not used to ventilate working places. In addition, the following requirements must be met:

(1) The belt entry must be equipped with an AMS that is installed, operated, examined, and maintained as specified in § 75.351.

(2) All miners must be trained annually in the basic operating principles of the AMS, including the actions required in the event of activation of any AMS alert or alarm signal. This training must be conducted prior to working underground in a mine that uses belt air to ventilate working sections or areas where mechanized mining equipment is installed or removed. It must be conducted as part of a miner's 30 CFR part 48 new miner training (§ 48.5), experienced miner training (§ 48.6), or annual refresher training (§ 48.8).

(3)(i) The average concentration of respirable dust in the belt air course, when used as a section intake air course, shall be maintained at or below 0.5 milligrams per cubic meter of air (mg/m 3).

(ii) A permanent designated area (DA) for dust measurements must be established at a point no greater than 50 feet upwind from the section loading point in the belt entry when the belt air flows over the loading point or no greater than 50 feet upwind from the point where belt air is mixed with air from another intake air course near the loading point. The DA must be specified and approved in the ventilation plan.

(4) The primary escapeway must be monitored for carbon monoxide or smoke as specified in § 75.351(f).

(5) The area of the mine with a belt air course must be developed with three or more entries.

(6) In areas of the mine developed after the effective date of this rule, unless approved by the district manager, no more than 50% of the total intake air, delivered to the working section or to areas where mechanized mining equipment is being installed or removed, can be supplied from the belt air course. The locations for measuring these air quantities must be approved in the mine ventilation plan.

(7) The air velocity in the belt entry must be at least 100 feet per minute. When requested by the mine operator, the district manager may approve lower velocities in the ventilation plan based on specific mine conditions.

(8) The air velocity in the belt entry must not exceed 1,000 feet per minute. When requested by the mine operator, the district manager may approve higher velocities in the ventilation plan based on specific mine conditions.

(c) Notwithstanding the provisions of § 75.380(g), additional intake air may be added to the belt air course through a point-feed regulator. The location and use of point feeds must be approved in the mine ventilation plan.

(d) If the air through the point-feed regulator enters a belt air course which is used to ventilate a working section or an area where mechanized mining equipment is being installed or removed, the following conditions must be met:

(1) The air current that will pass through the point-feed regulator must be monitored for carbon monoxide or smoke at a point within 50 feet upwind of the point-feed regulator. A second point must be monitored 1,000 feet upwind of the point-feed regulator unless the mine operator requests that a lesser distance be approved by the district manager in the mine ventilation plan based on mine specific conditions;

(2) The air in the belt air course must be monitored for carbon monoxide or smoke upwind of the point-feed regulator. This sensor must be in the belt air course within 50 feet of the mixing point where air flowing through the point-feed regulator mixes with the belt air;

(3) The point-feed regulator must be provided with a means to close the regulator from the intake air course without requiring a person to enter the crosscut where the point-feed regulator is located. The point-feed regulator must also be provided with a means to close the regulator from a location in the belt air course immediately upwind of the crosscut containing the point-feed regulator;

(4) A minimum air velocity of 300 feet per minute must be maintained through the point-feed regulator;

(5) The location(s) and use of a point-feed regulator(s) must be approved in the mine ventilation plan and shown on the mine ventilation map; and

(6) An AMS must be installed, operated, examined, and maintained as specified in § 75.351.

[89 FR 28479, 28480, Apr. 18, 2024]

§ 75.351 Atmospheric monitoring systems.

(a) AMS operation. Whenever personnel are underground and an AMS is used to fulfill the requirements of §§ 75.323(d)(1)(ii), 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), 75.350(d), or 75.362(f), the AMS must be operating and a designated AMS operator must be on duty at a location on the surface of the mine where audible and visual signals from the AMS must be seen or heard and the AMS operator can promptly respond to these signals.

(b) Designated surface location and AMS operator. When an AMS is used to comply with §§ 75.323(d)(1)(ii), 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), 75.350(d), or 75.362(f), the following requirements apply:

(1) The mine operator must designate a surface location at the mine where signals from the AMS will be received and two-way voice communication is maintained with each working section, with areas where mechanized mining equipment is being installed or removed, and with other areas designated in the approved emergency evacuation and firefighting program of instruction (§ 75.1502).

(2) The mine operator must designate an AMS operator to monitor and promptly respond to all AMS signals. The AMS operator must have as a primary duty the responsibility to monitor the malfunction, alert and alarm signals of the AMS, and to notify appropriate personnel of these signals. In the event of an emergency, the sole responsibility of the AMS operator shall be to respond to the emergency.

(3) A map or schematic must be provided at the designated surface location that shows the locations and type of AMS sensor at each location, and the intended air flow direction at these locations. This map or schematic must be updated within 24 hours of any change in this information.

(4) The names of the designated AMS operators and other appropriate personnel, including the designated person responsible for initiating an emergency mine evacuation under § 75.1501, and the method to contact these persons, must be provided at the designated surface location.

(c) Minimum operating requirements. AMSs used to comply with §§ 75.323(d)(1)(ii), 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), 75.350(d), or 75.362(f) must:

(1) Automatically provide visual and audible signals at the designated surface location for any interruption of circuit continuity and any electrical malfunction of the system. These signals must be of sufficient magnitude to be seen or heard by the AMS operator.

(2) Automatically provide visual and audible signals at the designated surface location when the carbon monoxide concentration or methane concentration at any sensor reaches the alert level as specified in § 75.351(i). These signals must be of sufficient magnitude to be seen or heard by the AMS operator.

(3) Automatically provide visual and audible signals at the designated surface location distinguishable from alert signals when the carbon monoxide, smoke, or methane concentration at any sensor reaches the alarm level as specified in § 75.351(i). These signals must be of sufficient magnitude to be seen or heard by the AMS operator.

(4) Automatically provide visual and audible signals at all affected working sections and at all affected areas where mechanized mining equipment is being installed or removed when the carbon monoxide, smoke, or methane concentration at any sensor reaches the alarm level as specified in § 75.351(i). These signals must be of sufficient magnitude to be seen or heard by miners working at these locations. Methane signals must be distinguishable from other signals.

(5) Automatically provide visual and audible signals at other locations as specified in Mine Emergency Evacuation and Firefighting Program of Instruction (§ 75.1502) when the carbon monoxide, smoke, or methane concentration at any sensor reaches the alarm level as specified in § 75.351(i). These signals must be seen or heard by miners working at these locations. Methane alarms must be distinguishable from other signals.

(6) Identify at the designated surface location the operational status of all sensors.

(7) Automatically provide visual and audible alarm signals at the designated surface location, at all affected working sections, and at all affected areas where mechanized mining equipment is being installed or removed when the carbon monoxide level at any two consecutive sensors alert at the same time. These signals must be seen or heard by the AMS operator and miners working at these locations.

(d) Location and installation of AMS sensors. (1) All AMS sensors, as specified in §§ 75.351(e) through 75.351(h), must be located such that measurements are representative of the mine atmosphere in these locations.

(2) Carbon monoxide or smoke sensors must be installed near the center in the upper third of the entry, in a location that does not expose personnel working on the system to unsafe conditions. Sensors must not be located in abnormally high areas or in other locations where air flow patterns do not permit products of combustion to be carried to the sensors.

(3) Methane sensors must be installed near the center of the entry, at least 12 inches from the roof, ribs, and floor, in a location that would not expose personnel working on the system to unsafe conditions.

(e) Location of sensors-belt air course. (1) In addition to the requirements of paragraph (d) of this section, any AMS used to monitor belt air courses under § 75.350(b) must have approved sensors to monitor for carbon monoxide at the following locations:

(i) At or near the working section belt tailpiece in the air stream ventilating the belt entry. In longwall mining systems the sensor must be located upwind in the belt entry at a distance no greater than 150 feet from the mixing point where intake air is mixed with the belt air at or near the tailpiece;

(ii) No more than 50 feet upwind from the point where the belt air course is combined with another air course or splits into multiple air courses;

(iii) At intervals not to exceed 1,000 feet along each belt entry. However, in areas along each belt entry where air velocities are between 50 and 100 feet per minute, spacing of sensors must not exceed 500 feet. In areas along each belt entry where air velocities are less than 50 feet per minute, the sensor spacing must not exceed 350 feet;

(iv) Not more than 100 feet downwind of each belt drive unit, each tailpiece, transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the distance between the units is less than 100 feet, they may be monitored with one sensor downwind of the last component. If the distance between the units exceeds 100 feet, additional sensors are required downwind of each belt drive unit, each tailpiece, transfer point, and each belt take-up; and

(v) At other locations in any entry that is part of the belt air course as required and specified in the mine ventilation plan.

(2) Smoke sensors must be installed to monitor the belt entry under § 75.350(b) at the following locations:

(i) At or near the working section belt tailpiece in the air stream ventilating the belt entry. In longwall mining systems the sensor must be located upwind in the belt entry at a distance no greater than 150 feet from the mixing point where intake air is mixed with the belt air at or near the tailpiece;

(ii) Not more than 100 feet downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the distance between the units is less than 100 feet, they may be monitored with one sensor downwind of the last component. If the distance between the units exceeds 100 feet, additional sensors are required downwind of each belt drive unit, each tailpiece, transfer point, and each belt take-up; and

(iii) At intervals not to exceed 3,000 feet along each belt entry.

(iv) This provision shall be effective one year after the Secretary has determined that a smoke sensor is available to reliably detect fire in underground coal mines.

(f) Locations of sensors—the primary escapeway. When used to monitor the primary escapeway under § 75.350(b)(4), carbon monoxide or smoke sensors must be located in the primary escapeway within 500 feet of the working section and areas where mechanized mining equipment is being installed or removed. In addition, another sensor must be located within 500 feet inby the beginning of the panel. The point-feed sensor required by § 75.350(d)(1) may be used as the sensor at the beginning of the panel if it is located within 500 feet inby the beginning of the panel.

(g) Location of sensors—return air splits. (1) If used to monitor return air splits under § 75.362(f), a methane sensor must be installed in the return air split between the last working place, longwall or shortwall face ventilated by that air split, and the junction of the return air split with another air split, seal, or worked out area.

(2) If used to monitor a return air split under § 75.323(d)(1)(ii), the methane sensors must be installed at the following locations:

(i) In the return air course opposite the section loading point, or, if exhausting auxiliary fan(s) are used, in the return air course no closer than 300 feet downwind from the fan exhaust and at a point opposite or immediately outby the section loading point; and

(ii) Immediately upwind from the location where the return air split meets another air split or immediately upwind of the location where an air split is used to ventilate seals or worked-out areas.

(h) Location of sensors—electrical installations. When monitoring the intake air ventilating underground transformer stations, battery charging stations, substations, rectifiers, or water pumps under § 75.340(a)(1)(ii) or § 75.340(a)(2)(ii), at least one sensor must be installed to monitor the mine atmosphere for carbon monoxide or smoke, located downwind and not greater than 50 feet from the electrical installation being monitored.

(i) Establishing alert and alarm levels. An AMS installed in accordance with the following paragraphs must initiate alert and alarm signals at the specified levels, as indicated:

(1) For § 75.323(d)(1)(ii) alarm at 1.5% methane.

(2) For §§ 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), and 75.350(d), alert at 5 ppm carbon monoxide above the ambient level and alarm at 10 ppm carbon monoxide above the ambient level when carbon monoxide sensors are used; and alarm at a smoke optical density of 0.022 per meter when smoke sensors are used. Reduced alert and alarm settings approved by the district manager may be required for carbon monoxide sensors identified in the mine ventilation plan, § 75.371(nn).

(3) For § 75.362(f), alert at 1.0% methane and alarm at 1.5% methane.

(j) Establishing carbon monoxide ambient levels. Carbon monoxide ambient levels and the means to determine these levels must be approved in the mine ventilation plan (§ 75.371(hh)) for monitors installed in accordance with §§ 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), and 75.350(d).

(k) Installation and maintenance. An AMS installed in accordance with §§ 75.323(d)(1)(ii), 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), 75.350(d), or 75.362(f) must be installed and maintained by personnel trained in the installation and maintenance of the system. The system must be maintained in proper operating condition.

(l) Sensors. Sensors used to monitor for carbon monoxide, methane, and smoke must be either of a type listed and installed in accordance with the recommendations of a nationally recognized testing laboratory approved by the Secretary; or these sensors must be of a type, and installed in a manner, approved by the Secretary.

(m) Time delays. When a demonstrated need exists, time delays may be incorporated into the AMS. These time delays must only be used to account for non-fire related carbon monoxide alert and alarm sensor signals. These time delays are limited to no more than three minutes. The use and length of any time delays, or other techniques or methods which eliminate or reduce the need for time delays, must be specified and approved in the mine ventilation plan.

(n) Examination, testing, and calibration. (1) At least once each shift when belts are operated as part of a production shift, sensors used to detect carbon monoxide or smoke in accordance with §§ 75.350(b), and 75.350(d), and alarms installed in accordance with § 75.350(b) must be visually examined.

(2) At least once every seven days, alarms for AMS installed in accordance with §§ 75.350(b), and 75.350(d) must be functionally tested for proper operation.

(3) At intervals not to exceed 31 days—

(i) Each carbon monoxide sensor installed in accordance with §§ 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), or 75.350(d) must be calibrated in accordance with the manufacturer's calibration specifications. Calibration must be done with a known concentration of carbon monoxide in air sufficient to activate the alarm;

(ii) Each smoke sensor installed in accordance with §§ 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), or 75.350(d) must be functionally tested in accordance with the manufacturer's calibration specifications;

(iii) Each methane sensor installed in accordance with §§ 75.323(d)(1)(ii) or 75.362(f) must be calibrated in accordance with the manufacturer's calibration specifications. Calibration must be done with a known concentration of methane in air sufficient to activate an alarm.

(iv) If the alert or alarm signals will be activated during calibration of sensors, the AMS operator must be notified prior to and upon completion of calibration. The AMS operator must notify miners on affected working sections, areas where mechanized mining equipment is being installed or removed, or other areas designated in the approved emergency evacuation and firefighting program of instruction (§ 75.1502) when calibration will activate alarms and when calibration is completed.

(4) Gases used for the testing and calibration of AMS sensors must be traceable to the National Institute of Standards and Technology reference standard for the specific gas. When these reference standards are not available for a specific gas, calibration gases must be traceable to an analytical standard which is prepared using a method traceable to the National Institute of Standards and Technology. Calibration gases must be within ±2.0 percent of the indicated gas concentration.

(o) Recordkeeping. (1) When an AMS is used to comply with §§ 75.323(d)(1)(ii), 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), 75.350(d), or 75.362(f), individuals designated by the operator must make the following records by the end of the shift in which the following event(s) occur:

(i) If an alert or alarm signal occurs, a record of the date, time, location and type of sensor, and the cause for the activation.

(ii) If an AMS malfunctions, a record of the date, the extent and cause of the malfunction, and the corrective action taken to return the system to proper operation.

(iii) A record of the seven-day tests of alert and alarm signals; calibrations; and maintenance of the AMS must be made by the person(s) performing these actions.

(2) The person entering the record must include their name, date, and signature in the record.

(3) The records required by this section must be kept either in a secure book that is not susceptible to alteration, or electronically in a computer system that is secure and not susceptible to alteration. These records must be maintained separately from other records and identifiable by a title, such as the ‘AMS log.’

(p) Retention period. Records must be retained for at least one year at a surface location at the mine and made available for inspection by miners and authorized representatives of the Secretary.

(q) Training. (1) All AMS operators must be trained annually in the proper operation of the AMS. This training must include the following subjects:

(i) Familiarity with underground mining systems;

(ii) Basic atmospheric monitoring system requirements;

(iii) The mine emergency evacuation and firefighting program of instruction;

(iv) The mine ventilation system including planned air directions;

(v) Appropriate response to alert, alarm and malfunction signals;

(vi) Use of mine communication systems including emergency notification procedures; and

(vii) AMS recordkeeping requirements.

(2) At least once every six months, all AMS operators must travel to all working sections.

(3) A record of the content of training, the person conducting the training, and the date the training was conducted, must be maintained at the mine for at least one year by the mine operator.

(r) Communications. When an AMS is used to comply with § 75.350(b), a two-way voice communication system required by § 75.1600 must be installed in an entry that is separate from the entry in which the AMS is installed no later than August 2, 2004. The two-way voice communication system may be installed in the entry where the intake sensors required by §§ 75.350(b)(4) or 75.350(d)(1) are installed.

[69 FR 17527, Apr. 2, 2004, as amended at 73 FR 80612, Dec. 31, 2008]

§ 75.352 Actions in response to AMS malfunction, alert, or alarm signals.

(a) When a malfunction, alert, or alarm signal is received at the designated surface location, the sensor(s) that are activated must be identified and the AMS operator must promptly notify appropriate personnel.

(b) Upon notification of a malfunction, alert, or alarm signal, appropriate personnel must promptly initiate an investigation to determine the cause of the signal and take the required actions set forth in paragraphs (c), (d), or (e) of this section.

(c) If any sensor installed in accordance with §§ 75.340(a)(1)(ii), 75.340(a)(2)(ii), 75.350(b), or 75.350(d) indicates an alarm or if any two consecutive sensors indicate alert at the same time, the following procedures must be followed unless the cause of the signal(s) is known not to be a hazard to miners:

(1) Appropriate personnel must notify miners in affected working sections, in affected areas where mechanized mining equipment is being installed or removed, and at other locations specified in the § 75.1502 approved mine emergency evacuation and firefighting program of instruction; and

(2) All personnel in the affected areas, unless assigned other duties under § 75.1502, must be withdrawn promptly to a safe location identified in the mine emergency evacuation and firefighting program of instruction.

(d) If there is an alert or alarm signal from a methane sensor installed in accordance with §§ 75.323(d)(1)(ii) and 75.362(f), an investigation must be initiated to determine the cause of the signal, and the actions required under § 75.323 must be taken.

(e) If any fire detection components of the AMS malfunction or are inoperative, immediate action must be taken to return the system to proper operation. While the AMS component repairs are being made, operation of the belt may continue if the following conditions are met:

(1) If one AMS sensor malfunctions or becomes inoperative, a trained person must continuously monitor for carbon monoxide or smoke at the inoperative sensor.

(2) If two or more adjacent AMS sensors malfunction or become inoperative, a trained person(s) must patrol and continuously monitor for carbon monoxide or smoke so that the affected areas will be traveled each hour in their entirety, or a trained person must be stationed to monitor at each inoperative sensor.

(3) If the complete AMS malfunctions or becomes inoperative, trained persons must patrol and continuously monitor for carbon monoxide or smoke so that the affected areas will be traveled each hour in their entirety.

(4) The trained person(s) monitoring under this section must, at a minimum, have two-way voice communication capabilities with the AMS operator at intervals not to exceed 2,000 feet and report contaminant levels to the AMS operator at intervals not to exceed 60 minutes.

(5) The trained person(s) monitoring under this section must report immediately to the AMS operator any concentration of the contaminant that reaches either the alert or alarm level specified in § 75.351(i), or the alternate alert and alarm levels specified in paragraph (e)(7) of this section, unless the source of the contaminant is known not to present a hazard.

(6) Detectors used to monitor under this section must have a level of detectability equal to that required of the sensors in § 75.351(l).

(7) For those AMSs using sensors other than carbon monoxide sensors, an alternate detector and the alert and alarm levels associated with that detector must be specified in the approved mine ventilation plan.

(f) If the minimum air velocity is not maintained when required under § 75.350(b)(7), immediate action must be taken to return the ventilation system to proper operation. While the ventilation system is being corrected, operation of the belt may continue only while a trained person(s) patrols and continuously monitors for carbon monoxide or smoke as set forth in §§ 75.352(e)(3) through (7), so that the affected areas will be traveled each hour in their entirety.

(g) The AMS shall automatically provide both a visual and audible signal in the belt entry at the point-feed regulator location, at affected sections, and at the designated surface location when carbon monoxide concentrations reach:

(1) The alert level at both point-feed intake monitoring sensors; or

(2) The alarm level at either point-feed intake monitoring sensor.

[69 FR 17529, Apr. 2, 2004, as amended at 73 FR 80613, Dec. 31, 2008]

§ 75.360 Preshift examination at fixed intervals.

(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.

(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.

(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:

(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.

(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.

(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.

(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.

(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.

(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,

(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.

(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.

(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.

(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.

(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.

(11) Preshift examinations shall include examinations to identify violations of the standards listed below:

(i) §§ 75.202(a) and 75.220(a)(1)—roof control;

(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;

(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;

(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;

(v) § 75.1722(a)—guarding moving machine parts; and

(vi) § 75.1731(a)—maintenance of belt conveyor components.

(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:

(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.

(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.

(3) At the intake end of any pillar line—

(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or

(ii) If a split system is used, in the intake entries of each split immediately inby the split point.

(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.

(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.

(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.

(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]

§ 75.361 Supplemental examination.

(a)(1) Except for certified persons conducting examinations required by this subpart, within 3 hours before anyone enters an area in which a preshift examination has not been made for that shift, a certified person shall examine the area for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(2) of this section, determine whether the air is traveling in its proper direction and at its normal volume, and test for methane and oxygen deficiency.

(2) Supplemental examinations shall include examinations to identify violations of the standards listed below:

(i) §§ 75.202(a) and 75.220(a)(1)—roof control;

(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;

(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;

(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;

(v) § 75.1722(a)—guarding moving machine parts; and

(vi) § 75.1731(a)—maintenance of belt conveyor components.

(b) Certification. At each working place examined, the person making the supplemental examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.

[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20714, 2012]

§ 75.362 On-shift examination.

(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.

(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.

(3) On-shift examinations shall include examinations to identify violations of the standards listed below:

(i) §§ 75.202(a) and 75.220(a)(1)—roof control;

(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;

(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;

(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;

(v) § 75.1722(a)—guarding moving machine parts; and

(vi) § 75.1731(a)—maintenance of belt conveyor components.

(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.

(c) Persons conducting the on-shift examination shall determine at the following locations:

(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.

(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.

(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.

(4) The volume of air at the intake end of any pillar line—

(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or

(ii) Where a split system is used in the intake entries of each split immediately inby the split point.

(d) (1) A qualified person shall make tests for methane—

(i) At the start of each shift at each working place before electrically operated equipment is energized; and

(ii) Immediately before equipment is energized, taken into, or operated in a working place; and

(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.

(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.

(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:

(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.

(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).

(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.

(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.

(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.

(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.

(e) If auxiliary fans and tubing are used, they shall be inspected frequently.

(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.

(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.

(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:

(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and

(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.

(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]

§ 75.363 Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

(a) Any hazardous condition found by the mine foreman or equivalent mine official, assistant mine foreman or equivalent mine official, or other certified persons designated by the operator for the purposes of conducting examinations under this subpart D, shall be posted with a conspicuous danger sign where anyone entering the areas would pass. A hazardous condition shall be corrected immediately or the area shall remain posted until the hazardous condition is corrected. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Only persons designated by the operator to correct or evaluate the hazardous condition may enter the posted area. Any violation of a mandatory health or safety standard found during a preshift, supplemental, on-shift, or weekly examination shall be corrected.

(b) A record shall be made of any hazardous condition and any violation of the nine mandatory health or safety standards found by the mine examiner. This record shall be kept in a book maintained for this purpose on the surface at the mine. The record shall be made by the completion of the shift on which the hazardous condition or violation of the nine mandatory health or safety standards is found and shall include the nature and location of the hazardous condition or violation and the corrective action taken. This record shall not be required for shifts when no hazardous conditions or violations of the nine mandatory health or safety standards are found.

(c) The record shall be made by the certified person who conducted the examination or a person designated by the operator. If made by a person other than the certified person, the certified person shall verify the record by initials and date by or at the end of the shift for which the examination was made. Records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(d) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

(e) Review of citations and orders. The mine operator shall review with mine examiners on a quarterly basis citations and orders issued in areas where preshift, supplemental, on-shift, and weekly examinations are required.

[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996; 77 FR 20715, Apr. 6, 2012]

§ 75.364 Weekly examination.

(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.

(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:

(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.

(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.

(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.

(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.

(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:

(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.

(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.

(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.

(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).

(5) In each escapeway so that the entire escapeway is traveled.

(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.

(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.

(8) Weekly examinations shall include examinations to identify violations of the standards listed below:

(i) §§ 75.202(a) and 75.220(a)(1)—roof control;

(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;

(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and

(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;

(v) § 75.1722(a)—guarding moving machine parts; and

(vi) § 75.1731(a)—maintenance of belt conveyor components.

(c) Measurements and tests. At least every 7 days, a certified person shall—

(1) Determine the volume of air entering the main intakes and in each intake split;

(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and

(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.

(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.

(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.

(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.

(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.

(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.

(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.

[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]

§ 75.370 Mine ventilation plan; submission and approval.

(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.

(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.

(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;

(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and

(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.

(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.

(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.

(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.

(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.

(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.

(f) The approved ventilation plan and any revisions shall be—

(1) Provided upon request to the representative of miners by the operator following notification of approval;

(2) Made available for inspection by the representative of miners; and

(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.

(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.

§ 75.371 Mine ventilation plan; contents.

The mine ventilation plan shall contain the information described below and any additional provisions required by the district manager:

(a) The mine name, company name, mine identification number, and the name of the individual submitting the plan information.

(b) Planned main mine fan stoppages, other than those scheduled for testing, maintenance or adjustment, including procedures to be followed during these stoppages and subsequent restarts (see § 75.311(a)) and the type of device to be used for monitoring main mine fan pressure, if other than a pressure recording device (see 75.310(a)(4)).

(c) Methods of protecting main mine fans and associated components from the forces of an underground explosion if a 15-foot offset from the nearest side of the mine opening is not provided (see § 75.310(a)(6)); and the methods of protecting main mine fans and intake air openings if combustible material will be within 100 feet of the area surrounding the fan or these openings (see § 75.311(f)).

(d) Persons that will be permitted to enter the mine, the work these persons will do while in the mine, and electric power circuits that will be energized when a back-up fan system is used that does not provide the ventilating quantity provided by the main mine fan (see § 75.311(c)).

(e) The locations and operating conditions of booster fans installed in anthracite mines (see § 75.302).

(f) Section and face ventilation systems used and the minimum quantity of air that will be delivered to the working section for each mechanized mining unit, including drawings illustrating how each system is used, and a description of each different dust suppression system used on equipment, identified by make and model, on each working section, including:

(1) The number, types, location, orientation, operating pressure, and flow rate of operating water sprays;

(2) The maximum distance that ventilation control devices will be installed from each working face when mining or installing roof bolts in entries and crosscuts;

(3) Procedures for maintaining the roof bolting machine dust collection system in approved condition; and

(4) Recommended best work practices for equipment operators to minimize dust exposure.

(g) Locations where the air quantities must be greater than 3,000 cubic feet per minute (see § 75.325(a)(1)).

(h) In anthracite mines, locations where the air quantities must be greater than 1,500 cubic feet per minute (see § 75.325(e)(1)).

(i) Working places and working faces other than those where coal is being cut, mined, drilled for blasting or loaded, where a minimum air quantity will be maintained, and the air quantity at those locations (see § 75.325(a)(1)).

(j) The operating volume of machine mounted dust collectors or diffuser fans, if used (see § 75.325(a)(3)), including the type and size of dust collector screen used, and a description of the procedures to maintain dust collectors used on equipment.

(k) The minimum mean entry air velocity in exhausting face ventilation systems where coal is being cut, mined, drilled for blasting, or loaded, if the velocity will be less than 60 feet per minute. Other working places where coal is not being cut, mined, drilled for blasting or loaded, where at least 60 feet per minute or some other minimum mean entry air velocity will be maintained (see § 75.326).

(l) The maximum distance if greater than 10 feet from each working face at which face ventilation control devices will be installed (see § 75.330(b)(2)). The working places other than those where coal is being cut, mined, drilled for blasting or loaded, where face ventilation control devices will be used (see § 75.330(b)(1)(ii).

(m) The volume of air required in the last open crosscut or the quantity of air reaching the pillar line if greater than 9,000 cubic feet per minute (see § 75.325(b)).

(n) In anthracite mines, the volume of air required in the last open crosscut or the quantity of air reaching the pillar line if greater than 5,000 cubic feet per minute (see § 75.325(e)(2)).

(o) Locations where separations of intake and return air courses will be built and maintained to other than the third connecting crosscut outby each working face (see § 75.333(b)(1)).

(p) The volume of air required at the intake to the longwall sections, if different than 30,000 cubic feet per minute (see § 75.325(c)).

(q) The velocities of air on a longwall or shortwall face, and the locations where the velocities must be measured (see § 75.325(c)(2)).

(r) The minimum quantity of air that will be provided during the installation and removal of mechanized mining equipment, the location where this quantity will be provided, and the ventilation controls that will be used (see § 75.325(d), (g), and (i)).

(s) The locations and frequency of the methane tests if required more often by § 75.362(d)(1)(iii) (see § 75.362 (d)(1)(iii).

(t) The locations where samples for “designated areas” will be collected, including the specific location of each sampling device, and the respirable dust control measures used at the dust generating sources for these locations (see §§ 70.207 and 70.209 of this chapter).

(u) The methane and dust control systems at underground dumps, crushers, transfer points, and haulageways.

(v) Areas in trolley haulage entries where the air velocity will be greater than 250 feet per minute and the velocity in these areas (see § 75.327(b)).

(w) Locations where entries will be advanced less than 20 feet from the inby rib without a crosscut being provided where a line brattice will be required. (see § 75.333(g)).

(x) A description of the bleeder system to be used, including its design (see § 75.334).

(y) The means for determining the effectiveness of bleeder systems (see § 75.334(c)(2)).

(z) The locations where measurements of methane and oxygen concentrations and air quantities and tests to determine whether the air is moving in the proper direction will be made to evaluate the ventilation of nonpillared worked-out areas (see § 75.364 (a)(1)) and the effectiveness of bleeder systems (see § 75.364 (a)(2)(iii). Alternative methods of evaluation of the effectiveness of bleeder systems (§ 75.364 (a)(2)(iv)).

(aa) The means for adequately maintaining bleeder entries free of obstructions such as roof falls and standing water (see § 75.334(c)(3)).

(bb) The location of ventilation devices such as regulators, stoppings and bleeder connectors used to control air movement through worked-out areas (see § 75.334(c)(4)). The location and sequence of construction of proposed seals for each worked-out area. (see § 75.334(e)).

(cc) In mines with a demonstrated history of spontaneous combustion: a description of the measures that will be used to detect methane, carbon monoxide, and oxygen concentration during and after pillar recovery and in worked-out areas where no pillars have been recovered (see § 75.334(f)(1); and, the actions which will be taken to protect miners from the hazards associated with spontaneous combustion (see § 75.334(f)(2). If a bleeder system will not be used, the methods that will be used to control spontaneous combustion, accumulations of methane-air mixtures, and other gases, dusts, and fumes in the worked-out area (see § 75.334(f)(3)).

(dd) The location of all horizontal degasification holes that are longer than 1,000 feet and the location of all vertical degasification holes.

(ee) If methane drainage systems are used, a detailed sketch of each system, including a description of safety precautions used with the systems.

(ff) Seal installation requirements provided by § 75.335 and the sampling provisions provided by § 75.336.

(gg) The alternative location for the additional sensing device if the device will not be installed on the longwall shearing machine (see § 75.342(a)(2)).

(hh) The ambient level in parts per million of carbon monoxide, and the method for determining the ambient level, in all areas where carbon monoxide sensors are installed.

(ii) The locations (designated areas) where dust measurements would be made in the belt entry when belt air is used to ventilate working sections or areas where mechanized mining equipment is being installed or removed, in accordance with § 75.350(b)(3).

(jj) The locations and approved velocities at those locations where air velocities in the belt entry are above or below the limits set forth in § 75.350(a)(2) or §§ 75.350(b)(7) and 75.350(b)(8).

(kk) The locations where air quantities are measured as set forth in § 75.350(b)(6).

(ll) The locations and use of point-feed regulators, in accordance with §§ 75.350(c) and 75.350(d)(5).

(mm) The location of any diesel-discriminating sensor, and additional carbon monoxide or smoke sensors installed in the belt air course.

(nn) The length of the time delay or any other method used to reduce the number of non-fire related alert and alarm signals from carbon monoxide sensors.

(oo) The reduced alert and alarm settings for carbon monoxide sensors, in accordance with § 75.351(i)(2).

(pp) The alternate detector and the alert and alarm levels associated with the detector, in accordance with § 75.352(e)(7).

(qq) The distance that separation between the primary escapeway and the belt or track haulage entries will be maintained if other than to the first connecting crosscut outby the section loading point (see § 75.380(g)).

(rr) In anthracite mines, the dimensions of escapeways where the pitch of the coal seam does not permit escapeways to be maintained 4 feet by 5 feet and the locations where these dimensions must be maintained (see § 75.381(c)(4)).

(ss) Areas designated by the district manager where measurements of CO and NO2 concentrations will be made (see § 70.1900(a)(4)).

(tt) Location where the air quantity will be maintained at the section loading point (see § 75.325(f)(2)).

(uu) Any additional location(s) required by the district manager where a minimum air quantity must be maintained for an individual unit of diesel-powered equipment. (see § 75.325(f)(5)).

(vv) The minimum air quantities that will be provided where multiple units of diesel-powered equipment are operated (see § 75.325(g) (1)-(3) and (i)).

(ww) The diesel-powered mining equipment excluded from the calculation under § 75.325(g). (see § 75.325(h)).

(xx) Action levels higher than the 50 percent level specified by § 70.1900(c). (see § 75.325(j)).

(yy) The locations where the pressure differential cannot be maintained from the primary escapeway to the belt entry.

[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 69 FR 17529, Apr. 2, 2004; 72 FR 28817, May 22, 2007; 73 FR 21209, Apr. 18, 2008; 73 FR 80613, Dec. 31, 2008; 79 FR 24987, May 1, 2014]

§ 75.372 Mine ventilation map.

(a)(1) At intervals not exceeding 12 months, the operator shall submit to the district manager 3 copies of an up-to-date map of the mine drawn to a scale of not less than 100 nor more than 500 feet to the inch. A registered engineer or a registered surveyor shall certify that the map is accurate.

(2) In addition to the informational requirements of this section the map may also be used to depict and explain plan contents that are required in § 75.371. Information shown on the map to satisfy the requirements of § 75.371 shall be subject to approval by the district manager.

(b) The map shall contain the following information:

(1) The mine name, company name, mine identification number, a legend identifying the scale of the map and symbols used, and the name of the individual responsible for the information on the map.

(2) All areas of the mine, including sealed and unsealed worked-out areas.

(3) All known mine workings that are located in the same coalbed within 1,000 feet of existing or projected workings. These workings may be shown on a mine map with a scale other than that required by paragraph (a) of this section, if the scale does not exceed 2,000 feet to the inch and is specified on the map.

(4) The locations of all known mine workings underlying and overlying the mine property and the distance between the mine workings.

(5) The locations of all known oil and gas wells and all known drill holes that penetrate the coalbed being mined.

(6) The locations of all main mine fans, installed backup fans and motors, and each fan's specifications, including size, type, model number, manufacturer, operating pressure, motor horsepower, and revolutions per minute.

(7) The locations of all surface mine openings and the direction and quantity of air at each opening.

(8) The elevation at the top and bottom of each shaft and slope, and shaft and slope dimensions, including depth and length.

(9) The direction of air flow in all underground areas of the mine.

(10) The locations of all active working sections and the four-digit identification number for each mechanized mining unit (MMU).

(11) The location of all escapeways and refuge alternatives.

(12) The locations of all ventilation controls, including permanent stoppings, overcasts, undercasts, regulators, seals, airlock doors, haulageway doors and other doors, except temporary ventilation controls on working sections.

(13) The direction and quantity of air—

(i) Entering and leaving each split;

(ii) In the last open crosscut of each set of entries and rooms; and

(iii) At the intake end of each pillar line, including any longwall or shortwall.

(14) Projections for at least 12 months of anticipated mine development, proposed ventilation controls, proposed bleeder systems, and the anticipated location of intake and return air courses, belt entries, and escapeways.

(15) The locations of existing methane drainage systems.

(16) The locations and type of all AMS sensors required by subpart D of this part.

(17) Contour lines that pass through whole number elevations of the coalbed being mined. These lines shall be spaced at 10-foot elevation levels unless a wider spacing is permitted by the district manager.

(18) The location of proposed seals for each worked-out area.

(19) The entry height, velocity and direction of the air current at or near the midpoint of each belt flight where the height and width of the entry are representative of the belt haulage entry.

(20) The location and designation of air courses that have been redesignated from intake to return for the purpose of ventilation of structures, areas or installations that are required by this subpart D to be ventilated to return air courses, and for ventilation of seals.

(c) The mine map required by § 75.1200 may be used to satisfy the requirements for the ventilation map, provided that all the information required by this section is contained on the map.

[61 FR 9829, Mar. 11, 1996, as amended at 69 FR 17530, Apr. 2, 2004; 73 FR 80697, Dec. 31, 2008]

§ 75.373 Reopening mines.

After a mine is abandoned or declared inactive, and before it is reopened, mining operations shall not begin until MSHA has been notified and has completed an inspection.

§ 75.380 Escapeways; bituminous and lignite mines.

(a) Except in situations addressed in § 75.381, § 75.385 and § 75.386, at least two separate and distinct travelable passageways shall be designated as escapeways and shall meet the requirements of this section.

(b) (1) Escapeways shall be provided from each working section, and each area where mechanized mining equipment is being installed or removed, continuous to the surface escape drift opening or continuous to the escape shaft or slope facilities to the surface.

(2) During equipment installation, these escapeways shall begin at the projected location for the section loading point. During equipment removal, they shall begin at the location of the last loading point.

(c) The two separate and distinct escapeways required by this section shall not end at a common shaft, slope, or drift opening, except that multiple compartment shafts or slopes separated by walls constructed of noncombustible material may be used as separate and distinct passageways.

(d) Each escapeway shall be—

(1) Maintained in a safe condition to always assure passage of anyone, including disabled persons;

(2) Clearly marked to show the route and direction of travel to the surface;

(3) Maintained to at least a height of 5 feet from the mine floor to the mine roof, excluding the thickness of any roof support, except that the escapeways shall be maintained to at least the height of the coalbed, excluding the thickness of any roof support, where the coalbed is less than 5 feet. In areas of mines where escapeways pass through doors, the height may be less than 5 feet, provided that sufficient height is maintained to enable miners, including disabled persons, to escape quickly in an emergency. In areas of mines developed before November 16, 1992, where escapeways pass over or under overcasts or undercasts, the height may be less than 5 feet provided that sufficient height is maintained to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient height is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher;

(4) Maintained at least 6 feet wide except—

(i) Where necessary supplemental roof support is installed, the escapeway shall not be less than 4 feet wide; or

(ii) Where the route of travel passes through doors or other permanent ventilation controls, the escapeway shall be at least 4 feet wide to enable miners to escape quickly in an emergency, or

(iii) Where the alternate escapeway passes through doors or other permanent ventilation controls or where supplemental roof support is required and sufficient width is maintained to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient width is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher, or

(iv) Where mobile equipment near working sections, and other equipment essential to the ongoing operation of longwall sections, is necessary during normal mining operations, such as material cars containing rock dust or roof control supplies, or is to be used for the evacuation of miners off the section in the event of an emergency. In any instance, escapeways shall be of sufficient width to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient width is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher;

(5) Located to follow the most direct, safe and practical route to the nearest mine opening suitable for the safe evacuation of miners; and

(6) Provided with ladders, stairways, ramps, or similar facilities where the escapeways cross over obstructions.

(7) Provided with a continuous, durable directional lifeline or equivalent device that shall be—

(i) Installed and maintained throughout the entire length of each escapeway as defined in paragraph (b)(1) of this section;

(ii) Flame-resistant in accordance with the requirements of part 18 of this chapter upon replacement of existing lifelines; but in no case later than June 15, 2009;

(iii) Marked with a reflective material every 25 feet;

(iv) Located in such a manner for miners to use effectively to escape;

(v) Equipped with one directional indicator cone securely attached to the lifeline, signifying the route of escape, placed at intervals not exceeding 100 feet. Cones shall be installed so that the tapered section points inby;

(vi) Equipped with one sphere securely attached to the lifeline at each intersection where personnel doors are installed in adjacent crosscuts;

(vii) Equipped with two securely attached cones, installed consecutively with the tapered section pointing inby, to signify an attached branch line is immediately ahead.

(A) A branch line leading from the lifeline to an SCSR cache will be marked with four cones with the base sections in contact to form two diamond shapes. The cones must be placed within reach of the lifeline.

(B) A branch line leading from the lifeline to a refuge alternative will be marked with a rigid spiraled coil at least eight inches in length. The spiraled coil must be placed within reach of the lifeline (see Illustration 1 below).

(e) Surface openings shall be adequately protected to prevent surface fires, fumes, smoke, and flood water from entering the mine.

(f) Primary escapeway. (1) One escapeway that is ventilated with intake air shall be designated as the primary escapeway. The primary escapeway shall have a higher ventilation pressure than the belt entry unless the mine operator submits an alternative in the mine ventilation plan to protect the integrity of the primary escapeway, based on mine specific conditions, which is approved by the district manager.

(2) Paragraphs (f)(3) through (f)(7) of this section apply as follows:

(i) To all areas of a primary escapeway developed on or after November 16, 1992;

(ii) Effective as of June 10, 1997, to all areas of a primary escapeway developed between March 30, 1970 and November 16, 1992; and

(iii) Effective as of June 10, 1997, to all areas of the primary escapeway developed prior to March 30, 1970 where separation of the belt and trolley haulage entries from the primary escapeway existed prior to November 16, 1992.

(3) The following equipment is not permitted in the primary escapeway:

(i) Mobile equipment hauling coal except for hauling coal incidental to cleanup or maintenance of the primary escapeway.

(ii) Compressors, except—

(A) Compressors necessary to maintain the escapeway in safe, travelable condition;

(B) Compressors that are components of equipment such as locomotives and rock dusting machines; and

(C) Compressors of less than five horsepower.

(iii) Underground transformer stations, battery charging stations, substations, and rectifiers except—

(A) Where necessary to maintain the escapeway in safe, travelable condition; and

(B) Battery charging stations and rectifiers and power centers with transformers that are either dry-type or contain nonflammable liquid, provided they are located on or near a working section and are moved as the section advances or retreats.

(iv) Water pumps, except—

(A) Water pumps necessary to maintain the escapeway in safe, travelable condition;

(B) Submersible pumps;

(C) Permissible pumps and associated permissible switchgear;

(D) Pumps located on or near a working section that are moved as the section advances or retreats;

(E) Pumps installed in anthracite mines; and

(F) Small portable pumps.

(4) Mobile equipment operated in the primary escapeway, except for continuous miners and as provided in paragraphs (f)(5), (f)(6), and (f)(7) of this section, shall be equipped with a fire suppression system installed according to §§ 75.1107-3 through 75.1107-16 that is—

(i) Manually operated and attended continuously by a person trained in the systems function and use, or

(ii) A multipurpose dry chemical type capable of both automatic and manual activation.

(5) Personnel carriers and small mobile equipment designed and used only for carrying people and small hand tools may be operated in primary escapeways if—

(i) The equipment is provided with a multipurpose dry chemical type fire suppression system capable of both automatic and manual activation, and the suppression system is suitable for the intended application and is listed or approved by a nationally recognized independent testing laboratory, or,

(ii) Battery powered and provided with two 10 pound multipurpose dry chemical portable fire extinguishers.

(6) Notwithstanding the requirements of paragraph (f)(3)(i), mobile equipment not provided with a fire suppression system may operate in the primary escapeway if no one is inby except those persons directly engaged in using or moving the equipment.

(7) Notwithstanding the requirements of paragraph (f)(3)(i), mobile equipment designated and used only as emergency vehicles or ambulances, may be operated in the primary escapeway without fire suppression systems.

(g) Except where separation of belt and trolley haulage entries from designated escapeways did not exist before November 15, 1992, and except as provided in § 75.350(c), the primary escapeway must be separated from belt and trolley haulage entries for its entire length, to and including the first connecting crosscut outby each loading point except when a greater or lesser distance for this separation is specified and approved in the mine ventilation plan and does not pose a hazard to miners.

(h) Alternate escapeway. One escapeway shall be designated as the alternate escapeway. The alternate escapeway shall be separated from the primary escapeway for its entire length, except that the alternate and primary escapeways may be ventilated from a common intake air shaft or slope opening.

(i) Mechanical escape facilities shall be provided and maintained for—

(1) Each shaft that is part of a designated escapeway and is greater than 50 feet in depth; and

(2) Each slope from the coal seam to the surface that is part of a designated escapeway and is inclined more than 9 degrees from the horizontal.

(j) Within 30 minutes after mine personnel on the surface have been notified of an emergency requiring evacuation, mechanical escape facilities provided under paragraph (i) of this section shall be operational at the bottom of shaft and slope openings that are part of escapeways.

(k) Except where automatically activated hoisting equipment is used, the bottom of each shaft or slope opening that is part of a designated escapeway shall be equipped with a means of signaling a surface location where a person is always on duty when anyone is underground. When the signal is activated or the evacuation of persons underground is necessary, the person shall assure that mechanical escape facilities are operational as required by paragraph (j) of this section.

(l)(1) Stairways or mechanical escape facilities shall be installed in shafts that are part of the designated escapeways and that are 50 feet or less in depth, except ladders may be used in shafts that are part of the designated escapeways and that are 5 feet or less in depth.

(2) Stairways shall be constructed of concrete or metal, set on an angle not to exceed 45 degrees from the horizontal, and equipped on the open side with handrails. In addition, landing platforms that are at least 2 feet by 4 feet shall be installed at intervals not to exceed 20 vertical feet on the stairways and equipped on the open side with handrails.

(3) Ladders shall be constructed of metal, anchored securely, and set on an angle not to exceed 60 degrees from the horizontal.

(m) A travelway designed to prevent slippage shall be provided in slope and drift openings that are part of designated escapeways, unless mechanical escape facilities are installed.

[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 69 FR 17530, Apr. 2, 2004; 71 FR 12269, Mar. 9, 2006; 71 FR 71452, Dec. 8, 2006; 73 FR 80613, Dec. 31, 2008]

§ 75.381 Escapeways; anthracite mines.

(a) Except as provided in §§ 75.385 and 75.386, at least two separate and distinct travelable passageways shall be designated as escapeways and shall meet the requirements of this section.

(b) Escapeways shall be provided from each working section continuous to the surface.

(c) Each escapeway shall be—

(1) Maintained in a safe condition to always assure passage of anyone, including disabled persons;

(2) Clearly marked to show the route of travel to the surface;

(3) Provided with ladders, stairways, ramps, or similar facilities where the escapeways cross over obstructions; and

(4) Maintained at least 4 feet wide by 5 feet high. If the pitch or thickness of the coal seam does not permit these dimensions to be maintained other dimensions may be approved in the ventilation plan.

(5) Provided with a continuous, durable directional lifeline or equivalent device that shall be—

(i) Installed and maintained throughout the entire length of each escapeway as defined in paragraph (b) of this section;

(ii) Flame-resistant in accordance with the requirements of part 18 of this chapter upon replacement of existing lifelines; but in no case later than June 15, 2009;

(iii) Marked with a reflective material every 25 feet;

(iv) Located in such a manner for miners to use effectively to escape;

(v) Equipped with one directional indicator cone securely attached to the lifeline, signifying the route of escape, placed at intervals not exceeding 100 feet. Cones shall be installed so that the tapered section points inby;

(vi) Equipped with one sphere securely attached to the lifeline at each intersection where personnel doors are installed in adjacent crosscuts;

(vii) Equipped with two securely attached cones, installed consecutively with the tapered section pointing inby, to signify an attached branch line is immediately ahead.

(A) A branch line leading from the lifeline to an SCSR cache will be marked with four cones with the base sections in contact to form two diamond shapes. The cones must be placed within reach of the lifeline.

(B) A branch line leading from the lifeline to a refuge alternative will be marked with a rigid spiraled coil at least eight inches in length. The spiraled coil must be placed within reach of the lifeline.

(d) Surface openings shall be adequately protected to prevent surface fires, fumes, smoke, and flood water from entering the mine.

(e) Primary escapeway. One escapeway that shall be ventilated with intake air shall be designated as the primary escapeway. The primary escapeway shall have a higher ventilation pressure than the belt entry unless the mine operator submits an alternative in the mine ventilation plan to protect the integrity of the primary escapeway, based on mine specific conditions, which is approved by the district manager.

(f) Alternate escapeway. One escapeway that shall be designated as the alternate escapeway shall be separated from the primary escapeway for its entire length.

(g) Mechanical escape facilities shall be provided—

(1) For each shaft or slope opening that is part of a primary escapeway; and

(2) For slopes that are part of escapeways, unless ladders are installed.

(h) Within 30 minutes after mine personnel on the surface have been notified of an emergency requiring evacuation, mechanical escape facilities shall be operational at the bottom of each shaft and slope opening that is part of an escapeway.

(i) Except where automatically activated hoisting equipment is used, the bottom of each shaft or slope opening that is part of a primary escapeway shall be equipped with a means of signaling a surface location where a person is always on duty when anyone is underground. When the signal is activated or the evacuation of personnel is necessary, the person on duty shall assure that mechanical escape facilities are operational as required by paragraph (h) of this section.

[61 FR 9829, Mar. 11, 1996, as amended at 71 FR 12269, Mar. 9, 2006; 71 FR 71452, Dec. 8, 2006; 73 FR 80614, Dec. 31, 2008]

§ 75.382 Mechanical escape facilities.

(a) Mechanical escape facilities shall be provided with overspeed, overwind, and automatic stop controls.

(b) Every mechanical escape facility with a platform, cage, or other device shall be equipped with brakes that can stop the fully loaded platform, cage, or other device.

(c) Mechanical escape facilities, including automatic elevators, shall be examined weekly. The weekly examination of this equipment may be conducted at the same time as a daily examination required by § 75.1400-3.

(1) The weekly examination shall include an examination of the headgear, connections, links and chains, overspeed and overwind controls, automatic stop controls, and other facilities.

(2) At least once each week, the hoist shall be run through one complete cycle of operation to determine that it is operating properly.

(d) A person trained to operate the mechanical escape facility always shall be available while anyone is underground to provide the mechanical escape facilities, if required, to the bottom of each shaft and slope opening that is part of an escapeway within 30 minutes after personnel on the surface have been notified of an emergency requiring evacuation. However, no operator is required for automatically operated cages, platforms, or elevators.

(e) Mechanical escape facilities shall have rated capacities consistent with the loads handled.

(f) Manually-operated mechanical escape facilities shall be equipped with indicators that accurately and reliably show the position of the facility.

(g) Certification. The person making the examination as required by paragraph (c) of this section shall certify by initials, date, and the time that the examination was made. Certifications shall be made at or near the facility examined.

§ 75.384 Longwall and shortwall travelways.

(a) If longwall or shortwall mining systems are used and the two designated escapeways required by § 75.380 are located on the headgate side of the longwall or shortwall, a travelway shall be provided on the tailgate side of that longwall or shortwall. The travelway shall be located to follow the most direct and safe practical route to a designated escapeway.

(b) The route of travel shall be clearly marked.

(c) When a roof fall or other blockage occurs that prevents travel in the travelway—

(1) Work shall cease on the longwall or shortwall face;

(2) Miners shall be withdrawn from face areas to a safe area outby the section loading point; and

(3) MSHA shall be notified.

(d) Work may resume on the longwall or shortwall face after the procedures set out in §§ 75.215 and 75.222 are implemented.

§ 75.385 Opening new mines.

When new mines are opened, no more than 20 miners at a time shall be allowed in any mine until a connection has been made between the mine openings, and these connections shall be made as soon as possible.

§ 75.386 Final mining of pillars.

When only one mine opening is available due to final mining of pillars, no more than 20 miners at a time shall be allowed in the mine, and the distance between the mine opening and working face shall not exceed 500 feet.

§ 75.388 Boreholes in advance of mining.

(a) Boreholes shall be drilled in each advancing working place when the working place approaches—

(1) To within 50 feet of any area located in the mine as shown by surveys that are certified by a registered engineer or registered surveyor unless the area has been preshift examined;

(2) To within 200 feet of any area located in the mine not shown by surveys that are certified by a registered engineer or registered surveyor unless the area has been preshift examined; or

(3) To within 200 feet of any mine workings of an adjacent mine located in the same coalbed unless the mine workings have been preshift examined.

(b) Boreholes shall be drilled as follows:

(1) Into the working face, parallel to the rib, and within 3 feet of each rib.

(2) Into the working face, parallel to the rib, and at intervals across the face not to exceed 8 feet.

(3) At least 20 feet in depth in advance of the working face, and always maintained to a distance of 10 feet in advance of the working face.

(c) Boreholes shall be drilled in both ribs of advancing working places described in paragraph (a) of this section unless an alternative drilling plan is approved by the District Manager in accordance with paragraph (g) of this section. These boreholes shall be drilled—

(1) At an angle of 45 degrees to the direction of advance;

(2) At least 20 feet in depth; and

(3) At intervals not to exceed 8 feet.

(d) When a borehole penetrates an area that cannot be examined, and before mining continues, a certified person shall, if possible, determine—

(1) The direction of airflow in the borehole;

(2) The pressure differential between the penetrated area and the mine workings;

(3) The concentrations of methane, oxygen, carbon monoxide, and carbon dioxide; and

(4) Whether water is impounded within the penetrated area.

(e) Unless action is taken to dewater or to ventilate penetrated areas, boreholes shall be plugged with wooden plugs or similar devices when—

(1) Tests conducted at the boreholes show that the atmosphere in the penetrated area contains more than 1.0 percent methane, less than 19.5 percent oxygen, or harmful concentrations of carbon monoxide, carbon dioxide or other explosive, harmful or noxious gases;

(2) Tests for methane, oxygen, carbon monoxide, and carbon dioxide cannot be made because air from mine workings is flowing into the penetrated area; or

(3) Water is discharging through the boreholes from the penetrated area into the mine workings.

(f) If mining is to be conducted within 50 feet above or below an inaccessible area of another mine, boreholes shall be drilled, as necessary, according to a plan approved by the district manager.

(g) Alternative borehole patterns that provide the same protection to miners as the pattern established by paragraphs (b) and (c) of this section may be used under a plan approved by the district manager.

§ 75.389 Mining into inaccessible areas.

(a) (1) The operator shall develop and follow a plan for mining into areas penetrated by boreholes drilled under § 75.388.

(2) Mining shall not resume into any area penetrated by boreholes until conditions in the penetrated area can be determined under § 75.388 and the plan for mining-through into the area has been approved by the district manager.

(3) A copy of the procedures to be followed shall be posted near the site of the mining-through operations and the operator shall explain these procedures to all miners involved in the operations.

(b) The procedures specified in the plan shall include—

(1) The method of ventilation, ventilation controls, and the air quantities and velocities in the affected working section and working place;

(2) Dewatering procedures to be used if a penetrated area contains a water accumulation; and

(3) The procedures and precautions to be followed during mining-through operations.

(c) Except for routine mining-through operations that are part of a retreat section ventilation system approved in accordance with § 75.371(f) and (x), the following provisions shall apply:

(1) Before and during mining-through operations, a certified person shall perform air quality tests at intervals and at locations necessary to protect the safety of the miners.

(2) During mining-through operations, only persons involved in these operations shall be permitted in the mine; and

(3) After mining-through, a certified person shall determine that the affected areas are safe before any persons enter the underground areas of the mine.

Subpart E Combustible Materials and Rock Dusting
§ 75.400 Accumulation of combustible materials.

Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.

[61 FR 55527, Oct. 25, 1996]

§ 75.400-1 Definitions.

(a) The term coal dust means particles of coal that can pass a No. 20 sieve.

(b) The term float coal dust means the coal dust consisting of particles of coal that can pass a No. 200 sieve.

(c) The term loose coal means coal fragments larger in size than coal dust.

§ 75.400-2 Cleanup program.

A program for regular cleanup and removal of accumulations of coal and float coal dusts, loose coal, and other combustibles shall be established and maintained. Such program shall be available to the Secretary or authorized representative.

§ 75.401 Abatement of dust; water or water with a wetting agent.

[Statutory Provision]

Where underground mining operations in active workings create or raise excessive amounts of dust, water or water with a wetting agent added to it, or other no less effective methods approved by the Secretary or his authorized representative, shall be used to abate such dust. In working places, particularly in distances less than 40 feet from the face, water, with or without a wetting agent, or other no less effective methods approved by the Secretary or his authorized representative, shall be applied to coal dust on the ribs, roof, and floor to reduce dispersibility and to minimize the explosion hazard.

§ 75.401-1 Excessive amounts of dust.

The term “excessive amounts of dust” means coal and float coal dust in the air in such amounts as to create the potential of an explosion hazard.

§ 75.402 Rock dusting.

[Statutory Provision]

All underground areas of a coal mine, except those areas in which the dust is too wet or too high in incombustible content to propagate an explosion, shall be rock dusted to within 40 feet of all working faces, unless such areas are inaccessible or unsafe to enter or unless the Secretary or his authorized representative permits an exception upon his finding that such exception will not pose a hazard to the miners. All crosscuts that are less than 40 feet from a working face shall also be rock dusted.

§ 75.402-1 Definition.

The term too wet means that sufficient natural moisture is retained by the dust that when a ball of finely divided material is squeezed in the hands water is exuded.

§ 75.402-2 Exceptions.

Exceptions granted under § 75.402 by the Secretary or his authorized representative shall be reviewed periodically.

§ 75.403 Maintenance of incombustible content of rock dust.

Where rock dust is required to be applied, it shall be distributed upon the top, floor, and sides of all underground areas of a coal mine and maintained in such quantities that the incombustible content of the combined coal dust, rock dust, and other dust shall be not less than 80 percent. Where methane is present in any ventilating current, the percent of incombustible content of such combined dust shall be increased 0.4 percent for each 0.1 percent of methane.

[75 FR 57857, Sept. 23, 2010; 76 FR 35978, June 21, 2011]

§ 75.403-1 Incombustible content.

Moisture contained in the combined coal dust, rock dust and other dusts shall be considered as a part of the incombustible content of such mixture.

§ 75.404 Exemption of anthracite mines.

[Statutory Provision]

Sections 75.401, 75.402, and 75.403 shall not apply to underground anthracite mines.

Subpart F Electrical Equipment—General
§ 75.500 Permissible electric equipment.

[Statutory Provision]

On and after March 30, 1971:

(a) All junction or distribution boxes used for making multiple power connections inby the last open crosscut shall be permissible;

(b) All handheld electric drills, blower and exhaust fans, electric pumps, and such other low horsepower electric face equipment as the Secretary may designate on or before May 30, 1970, which are taken into or used inby the last open crosscut of any coal mine shall be permissible;

(c) All electric face equipment which is taken into or used inby the last open crosscut of any coal mine classified under any provision of law as gassy prior to March 30, 1970, shall be permissible; and

(d) All other electric face equipment which is taken into or used inby the last crosscut of any coal mine, except a coal mine referred to in § 75.501, which has not been classified under any provision of law as a gassy mine prior to March 30, 1970, shall be permissible.

§ 75.500-1 Other low horsepower electric face equipment.

Other low horsepower electric face equipment designated pursuant to the provisions of § 75.500(b) is all other electric-driven mine equipment, except low horsepower rock dusting equipment, and employs an electric current supplied by either a power conductor or battery and consumes not more than 2,250 watts of electricity and which is taken into or used inby the last open crosscut.

§ 75.501 Permissible electric face equipment; coal seams above water table.

[Statutory Provision]

On and after March 30, 1974, all electric face equipment, other than equipment referred to in paragraph (b) of § 75.500, which is taken into and used inby the last open crosscut of any coal mine which is operated entirely in coal seams located above the water table and which has not been classified under any provision of law as a gassy mine prior to March 30, 1970, and in which one or more openings were made prior to December 30, 1969, shall be permissible.

§ 75.501-1 Coal seams above the water table.

As used in § 75.501, the phrase “coal seams above the water table” means coal seams in a mine which are located at an elevation above a river or the tributary of a river into which a local surface water system naturally drains.

§ 75.501-2 Permissible electric face equipment.

(a) On and after March 30, 1971, in mines operated entirely in coal seams which are located at elevations above the water table:

(1) All junction or distribution boxes used for making multiple power connections inby the last open crosscut shall be permissible; and

(2) All handheld electric drills, blower and exhaust fans, electric pumps, and all other electric-driven mine equipment, except low horsepower rock dusting equipment, that employs an electric current supplied by either a power conductor or battery and consumes not more than 2,250 watts of electricity, which is taken into or used inby the last open crosscut shall be permissible.

(b) On and after March 30, 1974, in mines operated entirely in coal seams which are located at elevations above the water table, all electric face equipment which is taken into or used inby the last crosscut shall be permissible.

§ 75.501-3 New openings; mines above water table and never classed gassy.

(a) Where a new opening(s) is proposed to be developed by shaft, slope, or drift from the surface to, or in, any coalbed and the operator considers such proposed new opening(s) to be a part of a mine coming under section 305(a)(2) of the Act and § 75.501 the operator shall so notify the District Manager for the District in which the mine is located in writing prior to the date any actual development (in coal) through such opening(s) is undertaken. Such notification shall include the following information:

(1) Name, address, and identification number of the existing mine.

(2) A current map of the existing mine clearly setting out the proposed new opening(s), mining plan and planned interconnection, if any, with existing workings.

(3) A statement as to when the operator obtained the right to mine the coal which the proposed new opening(s) will traverse.

(4) The name of the coalbeds currently being mined and those which the new opening(s) will traverse.

(5) The expected life of the mine.

(6) The reason(s) for the proposed new opening(s) (for example, haulage, ventilation, drainage, to avoid bad roof, escapeway).

The District Manager shall require submission of any additional information he considers pertinent.

(b) The District Manager shall make a determination based on all of the information submitted by the operator as to whether the proposed new opening(s) will be considered as a part of the existing mine or as a new mine. The following guidelines and criteria shall be used by the District Manager in making his determination:

(1) The effect that the proposed new opening(s) will have on the safety of the men working in the existing mine shall be considered of primary importance.

(2) Whether the operator had a right to mine the coal which the proposed new openings will traverse prior to the date of enactment of the Act (December 30, 1969) and whether the original mining plan included mining such coal.

(3) Whether, in accordance with the usual mining practices common to the particular district, the proposed new openings would have been considered a new mine or part of the existing mine. A number of factors will be considered including, but not limited to:

(i) The relationship between the coalbeds currently being mined, and those proposed to be mined;

(ii) The distance between existing openings and the proposed new opening(s);

(iii) The projected time elapsing between the start of the new opening(s) and planned interconnection, if any, with the existing mine; and

(iv) The projected tonnage of coal which is expected to be mined prior to interconnection where interconnection is planned.

The District Manager shall notify the operator in writing within 30 days of receiving all of the information, required and requested, of his determination. No informal notification shall be given.

(c) All new opening(s) shall be operated as a new mine prior to receiving a written notification from the District Manager that such new opening(s) will be considered part of an existing mine coming under section 305(a)(2) of the Act and § 75.501.

(d) Nothing in this § 75.501-3 shall be construed to relieve the operator from compliance with any of the mandatory standards contained in this Part 75.

[37 FR 8949, May 3, 1972]

§ 75.502 Permits for noncompliance.

An operator need not comply with paragraph (d) of § 75.500 or with § 75.501 during the period of time specified in a permit issued by the Interim Compliance Panel established by the Act.

§ 75.503 Permissible electric face equipment; maintenance.

[Statutory Provisions]

The operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.

§ 75.503-1 Statement listing all electric face equipment.

Each operator of a coal mine shall complete and file Mine Safety and Health Administration Form No. 6-1496 entitled “Coal Operator's Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment.” Forms may be obtained from any MSHA Coal Mine Safety and Health district office. Separate forms shall be filed for each mine. Copies one and two of the completed form shall be filed with the Coal Mine District Manager for the district in which each mine is located on or before May 30, 1970. An operator must list all electric face equipment being used at each mine as of the time of filing, all such equipment being repaired, and all standby electric equipment stored at or in the mine which the operator intends to use as face equipment.

[35 FR 17890, Nov. 20, 1970, as amended at 71 FR 16668, Apr. 3, 2006]

§ 75.504 Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face equipment.

On and after March 30, 1971, all new, replacement, used, reconditioned, and additional electric face equipment used in any mine referred to in §§ 75.500, 75.501, and 75.503 shall be permissible and shall be maintained in a permissible condition, and in the event of any major overhaul of any item of electric face equipment in use on or after March 30, 1971, such equipment shall be put in, and thereafter maintained in, a permissible condition, unless in the opinion of the Secretary, such equipment or necessary replacement parts are not available.

[38 FR 4975, Feb. 23, 1973]

§ 75.505 Mines classed gassy; use and maintenance of permissible electric face equipment.

[Statutory Provision]

Any coal mine which, prior to March 30, 1970, was classed gassy under any provision of law and was required to use permissible electric face equipment and to maintain such equipment in a permissible condition shall continue to use such equipment and to maintain such equipment in such condition.

§ 75.506 Electric face equipment; requirements for permissibility.

(a) Electric-driven mine equipment and accessories manufactured on or after March 30, 1973, will be permissible electric face equipment only (1) if they are fabricated, assembled, or built under an approval, or any extension thereof, issued by the Bureau of Mines or the Mine Safety and Health Administration in accordance with schedule 2G, or any subsequent Bureau of Mines schedule promulgated by the Secretary after March 30, 1970, which amends, modifies, or supersedes the permissibility requirements of schedule 2G, and (2) if they are maintained in a permissible condition.

(b) Except as provided in paragraph (c) of this § 75.506 electric-driven mine equipment and accessories manufactured prior to March 30, 1973, will be permissible electric face equipment (1) if they were fabricated, assembled, or built under an approval, or any extension thereof, issued by the Bureau of Mines in accordance with the schedules set forth below, and (2) if they are maintained in a permissible condition.

Bureau of Mines Schedule 2D, May 23, 1936; Bureau of Mines Schedule 2E, February 15, 1945; Bureau of Mines Schedule 2F, August 3, 1955; and Bureau of Mines Schedule 2G, March 19, 1968.

Copies of these schedules are available at all MSHA Coal Mine Safety and Health district offices.

(c) Electric driven mine equipment and accessories bearing the Bureau of Mines approval numbers listed in Appendix A to this subpart are permissible electric face equipment only if they are maintained in a permissible condition.

(d) The following equipment will be permissible electric face equipment only if it is approved under the appropriate parts of this chapter, or former Bureau of Mines' approval schedules, and if it is in permissible condition:

(1) Multiple-Shot Blasting Units, part 7 subpart D;

(2) Electric Cap Lamps, part 19;

(3) Electric Mine Lamps Other than Standard Cap Lamps, part 20;

(4) [Reserved]

(5) Portable Methane Detectors, part 22;

(6) Telephone and Signaling Devices, part 23;

(7) Single-Shot Blasting Units;

(8) Lighting Equipment for Illuminating Underground Workings;

(9) Methane-Monitoring Systems, part 27; and

(10) Continuous Duty, Warning Light, Portable Methane Detectors, 30 CFR part 29 contained in the 30 CFR, parts 1-199, edition, revised as of July 1, 1999.

[35 FR 17890, Nov. 20, 1970, as amended at 63 FR 47119, Sept. 3, 1998; 64 FR 43283, Aug. 10, 1999; 71 FR 16668, Apr. 3, 2006; 91 FR 38287, June 25, 2026]

§ 75.506-1 Electric face equipment; permissible condition; maintenance requirements.

(a) Except as provided in paragraph (b) of this section, electric face equipment which meets the requirements for permissibility set forth in § 75.506 will be considered to be in permissible condition only if it is maintained so as to meet the requirements for permissibility set forth in the Bureau of Mines schedule under which such electric face equipment was initially approved, or, if the equipment has been modified, it is maintained so as to meet the requirements of the schedule under which such modification was approved.

(b) Electric face equipment bearing the Bureau of Mines approval number listed in Appendix A of this subpart will be considered to be in permissible condition only if it is maintained so as to meet the requirements for permissibility set forth in Bureau of Mines Schedule 2D or, if such equipment has been modified, it is maintained so as to meet the requirements of the schedule under which the modification was approved.

(c) Notwithstanding the provisions of paragraphs (a) and (b) of this section, where the minimum requirements for permissibility set forth in the appropriate Bureau of Mines schedule under which such equipment or modifications were approved have been superseded by the requirements of this Part 75, the latter requirements shall be applicable.

§ 75.507 Power connection points.

[Statutory Provisions]

Except where permissible power connection units are used, all power-connection points outby the last open crosscut shall be in intake air.

§ 75.507-1 Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements.

(a) All electric equipment, other than power-connection points, used in return air outby the last open crosscut in any coal mine shall be permissible except as provided in paragraphs (b) and (c) of this section.

(b) Notwithstanding the provisions of paragraph (a) of this section, in any coal mine where nonpermissible electric face equipment may be taken into or used inby the last open crosscut until March 30, 1974, such nonpermissible electric face equipment may be used in return air outby the last open crosscut.

(c) Notwithstanding the provisions of paragraph (a) of this section, in any coal mine where a permit for noncompliance is in effect, nonpermissible electric face equipment specified in such permit for noncompliance may be used in return air outby the last open crosscut for the duration of such permit.

[38 FR 4975, Feb. 23, 1973]

§ 75.508 Map of electrical system.

[Statutory Provisions]

The location and the electrical rating of all stationary electric apparatus in connection with the mine electric system, including permanent cables, switchgear, rectifying substations, transformers, permanent pumps, and trolley wires and trolley feeder wires, and settings of all direct-current circuit breakers protecting underground trolley circuits, shall be shown on a mine map. Any changes made in a location, electric rating, or setting shall be promptly shown on the map when the change is made. Such map shall be available to an authorized representative of the Secretary and to the miners in such mine.

§ 75.508-1 Mine tracks.

When mine track is used as a conductor of a trolley system, the location of such track shall be shown on the map required by § 75.508, with a notation of the number of rails and the size of such track expressed in pounds per yard.

§ 75.508-2 Changes in electric system map; recording.

Changes made in the location, electrical rating or setting within the mine electrical system shall be recorded on the map of such system no later than the end of the next workday following completion of such changes.

§ 75.509 Electric power circuit and electric equipment; deenergization.

[Statutory Provisions]

All power circuits and electric equipment shall be deenergized before work is done on such circuits and equipment, except when necessary for trouble shooting or testing.

§ 75.510 Energized trolley wires; repair.

[Statutory Provisions]

Energized trolley wires may be repaired only by a person trained to perform electrical work and to maintain electrical equipment and the operator of a mine shall require that such person wear approved and tested insulated shoes and wireman's gloves.

§ 75.510-1 Repair of energized trolley wires; training.

The training referred to in § 75.510 must include training in the repair and maintenance of live trolley wires, and in the hazards involved in making such repairs, and in the limitations of protective clothing used to protect against such hazards.

§ 75.511 Low-, medium-, or high-voltage distribution circuits and equipment; repair.

[Statutory Provision]

No electrical work shall be performed on low-, medium-, or high-voltage distribution circuits or equipment, except by a qualified person or by a person trained to perform electrical work and to maintain electrical equipment under the direct supervision of a qualified person. Disconnecting devices shall be locked out and suitably tagged by the persons who perform such work, except that in cases where locking out is not possible, such devices shall be opened and suitably tagged by such persons. Locks or tags shall be removed only by the persons who installed them or, if such persons are unavailable, by persons authorized by the operator or his agent.

§ 75.511-1 Qualified person.

To be a qualified person within the meaning of § 75.511, an individual must meet the requirements of § 75.153.

§ 75.512 Electric equipment; examination, testing and maintenance.

[Statutory Provision]

All electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept and made available to an authorized representative of the Secretary and to the miners in such mine.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.512-1 Qualified person.

To be a qualified person within the meaning of § 75.512, an individual must meet the requirements of § 75.153.

§ 75.512-2 Frequency of examinations.

The examinations and tests required by § 75.512 shall be made at least weekly. Permissible equipment shall be examined to see that it is in permissible condition.

§ 75.513 Electric conductor; capacity and insulation.

[Statutory Provision]

All electric conductors shall be sufficient in size and have adequate current carrying capacity and be of such construction that a rise in temperature resulting from normal operation will not damage the insulating materials.

§ 75.513-1 Electric conductor; size.

An electric conductor is not of sufficient size to have adequate carrying capacity if it is smaller than is provided for in the National Electric Code, 1968. In addition, equipment and trailing cables that are required to be permissible must meet the requirements of the appropriate schedules of the Bureau of Mines.

§ 75.514 Electrical connections or splices; suitability.

[Statutory Provision]

All electrical connections or splices in conductors shall be mechanically and electrically efficient, and suitable connectors shall be used. All electrical connections or splices in insulated wire shall be reinsulated at least to the same degree of protection as the remainder of the wire.

§ 75.515 Cable fittings; suitability.

[Statutory Provision]

Cables shall enter metal frames of motors, splice boxes, and electric compartments only through proper fittings. When insulated wires other than cables pass through metal frames, the holes shall be substantially bushed with insulated bushings.

§ 75.516 Power wires; support.

[Statutory Provision]

All power wires (except trailing cables on mobile equipment, specially designed cables conducting high-voltage power to underground rectifying equipment or transformers, or bare or insulated ground and return wires) shall be supported on well-insulated insulators and shall not contact combustible material, roof, or ribs.

§ 75.516-1 Installed insulators.

Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks may be used to suspend insulated power cables for temporary installation not exceeding 6 months and for permanent installation of control cables such as may be used along belt conveyors.

§ 75.516-2 Communication wires and cables; installation; insulation; support.

(a) All communication wires shall be supported on insulated hangers or insulated J-hooks.

(b) All communication cables shall be insulated as required by § 75.517-1, and shall either be supported on insulated or uninsulated hangers or J-hooks, or securely attached to messenger wires, or buried, or otherwise protected against mechanical damage in a manner approved by the Secretary or his authorized representative.

(c) All communication wires and cables installed in track entries shall, except when a communication cable is buried in accordance with paragraph (b) of this section, be installed on the side of the entry opposite to trolley wires and trolley feeder wires. Additional insulation shall be provided for communication circuits at points where they pass over or under any power conductor.

(d) For purposes of this section, communication cable means two or more insulated conductors covered by an additional abrasion-resistant covering.

[38 FR 4975, Feb. 23, 1973]

§ 75.517 Power wires and cables; insulation and protection.

[Statutory Provisions]

Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.

§ 75.517-1 Power wires and cables; insulation and protection.

Power wires and cables installed on or after March 30, 1970, shall have insulation with a dielectric strength at least equal to the voltage of the circuit.

§ 75.517-2 Plans for insulation of existing bare power wires and cables.

(a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to March 30, 1970, shall be filed with the District Manager of the Coal Mine Safety District in which the mine is located to permit approval and prompt implementation of such plans.

(b) The appropriate District Manager shall notify the operator in writing of the approval of a proposed insulation plan. If revisions are required for approval, the changes required will be specified.

(c) An insulation plan shall include the following information:

(1) Name and address of the company, the mine and the responsible officials;

(2) Map or diagram indicating location of power wires and cables required to be insulated;

(3) Total length of bare power wires and cables required to be insulated;

(4) Schedule for the replacement or insulation of bare power wires and cables;

(5) Type of insulation to be used and the voltage rating as indicated by the manufacturer.

(d) The District Manager shall be guided by the following criteria in approving insulation plans on a mine-by-mine basis. Insulation not conforming to these criteria may be approved provided the operator can satisfy the Mine Safety and Health Administration that the insulation will provide no less than the same measure of protection.

(1) Insulation shall be adequate for the applied voltage of the circuit.

(2) When tubing is used to insulate existing power wires and cables, it shall have a dielectric strength at least equal to the voltage of the circuit. When the tubing is split for purposes of installation, the joints shall be effectively sealed. The butt ends may be sealed with a moisture resistant insulating tape.

(3) When tape is used to insulate existing power wires and cables, it shall be applied half-lapped and one thickness of the tape shall have a dielectric strength at least equal to the voltage of the circuit. The tape shall be self-adhesive and moisture resistant.

§ 75.518 Electric equipment and circuits; overload and short circuit protection.

[Statutory Provision]

Automatic circuit-breaking devices or fuses of the correct type and capacity shall be installed so as to protect all electric equipment and circuits against short circuit and overloads. Three-phase motors on all electric equipment shall be provided with overload protection that will deenergize all three phases in the event that any phase is overloaded.

§ 75.518-1 Electric equipment and circuits; overload and short circuit protection; minimum requirements.

A device to provide either short circuit protection or protection against overload which does not conform to the provisions of the National Electric Code, 1968, does not meet the requirement of § 75.518. In addition, such devices on electric face equipment and trailing cables that are required to be permissible must meet the requirements of the applicable schedules of the Bureau of Mines.

§ 75.518-2 Incandescent lamps, overload and short circuit protection.

Incandescent lamps installed along haulageways and at other locations, not contacting combustible material, and powered from trolley or direct current feeder circuits, need not be provided with separate short circuit or overload protection, if the lamp is not more than 8 feet in distance from such circuits.

§ 75.519 Main power circuits; disconnecting switches.

[Statutory Provision]

In all main power circuits, disconnecting switches shall be installed underground within 500 feet of the bottoms of shafts and boreholes through which main power circuits enter the underground area of the mine and within 500 feet of all other places where main power circuits enter the underground area of the mine.

§ 75.519-1 Main power circuits; disconnecting switches; locations.

Section 75.519 requires (a) that a disconnecting switch be installed on the surface at a point within 500 feet of the place where the main power circuit enters the underground area of a mine, and (b) that, in an instance on which a main power circuit enters the underground area through a shaft or borehole, a disconnecting switch be installed underground within 500 feet of the bottom of the shaft or borehole.

§ 75.520 Electric equipment; switches.

[Statutory Provision]

All electric equipment shall be provided with switches or other controls that are safely designed, constructed, and installed.

§ 75.521 Lightning arresters; ungrounded and exposed power conductors and telephone wires.

Each ungrounded, exposed power conductor and each ungrounded, exposed telephone wire that leads underground shall be equipped with suitable lightning arresters of approved type within 100 feet of the point where the circuit enters the mine. Lightning arresters shall be connected to a low resistance grounding medium on the surface which shall be separated from neutral grounds by a distance of not less than 25 feet.

[38 FR 4975, Feb. 23, 1973]

§ 75.522 Lighting devices.

[Statutory Provision]

No device for the purpose of lighting any coal mine which has not been approved by the Secretary or his authorized representative shall be permitted in such mine.

§ 75.522-1 Incandescent and fluorescent lamps.

(a) Except for areas of a coal mine inby the last open crosscut, incandescent lamps may be used to illuminate underground areas. When incandescent lamps are used in a track entry or belt entry or near track entries to illuminate special areas other than structures, the lamps shall be installed in weather-proof sockets located in positions such that the lamps will not come in contact with any combustible material. Lamps used in all other places must be of substantial construction and be fitted with a glass enclosure.

(b) Incandescent lamps within glass enclosures or fluorescent lamps may be used inside underground structures (except magazines used for the storage of explosives and detonators). In underground structures lighting circuits shall consist of cables installed on insulators or insulated wires installed in metallic conduit or metallic armor.

§ 75.523 Electric face equipment; deenergization.

[Statutory Provision]

An authorized representative of the Secretary may require in any mine that electric face equipment be provided with devices that will permit the equipment to be deenergized quickly in the event of an emergency.

§ 75.523-1 Deenergization of self-propelled electric face equipment installation requirements.

(a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric face equipment which is used in the active workings of each underground coal mine on and after March 1, 1973, shall, in accordance with the schedule of time specified in paragraphs (a) (1) and (2) of this section, be provided with a device that will quickly deenergize the tramming motors of the equipment in the event of an emergency. The requirements of this paragraph (a) shall be met as follows:

(1) On and after December 15, 1974, for self-propelled cutting machines, shuttle cars, battery-powered machines, and roof drills and bolters;

(2) On and after February 15, 1975, for all other types of self-propelled electric face equipment.

(b) Self-propelled electric face equipment that is equipped with a substantially constructed cab which meets the requirements of this part, shall not be required to be provided with a device that will quickly deenergize the tramming motors of the equipment in the event of an emergency.

(c) An operator may apply to the Director of Technical Support, Mine Safety and Health Administration, Department of Labor, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; for approval of the installation of devices to be used in lieu of devices that will quickly deenergize the tramming motors of self-propelled electric face equipment in the event of an emergency. The Director of Technical Support may approve such devices if he determines that the performance thereof will be no less effective than the performance requirements specified in § 75.523-2.

[38 FR 3407, Feb. 6, 1973, as amended at 39 FR 27557, July 30, 1974; 43 FR 12320, Mar. 24, 1978; 47 FR 28096, June 29, 1982; 67 FR 38386, June 4, 2002; 80 FR 52992, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.523-2 Deenergization of self-propelled electric face equipment; performance requirements.

(a) Deenergization of the tramming motors of self-propelled electric face equipment, required by paragraph (a) of § 75.523-1, shall be provided by:

(1) Mechanical actuation of an existing pushbutton emergency stopswitch,

(2) Mechanical actuation of an existing lever emergency stopswitch, or

(3) The addition of a separate electromechanical switch assembly.

(b) The existing emergency stopswitch or additional switch assembly shall be actuated by a bar or lever which shall extend a sufficient distance in each direction to permit quick deenergization of the tramming motors of self-propelled electric face equipment from all locations from which the equipment can be operated.

(c) Movement of not more than 2 inches of the actuating bar or lever resulting from the application of not more than 15 pounds of force upon contact with any portion of the equipment operator's body at any point along the length of the actuating bar or lever shall cause deenergization of the tramming motors of the self-propelled electric face equipment.

[38 FR 3406, Feb. 6, 1973; 38 FR 4394, Feb. 14, 1973]

§ 75.523-3 Automatic emergency-parking brakes.

(a) Except for personnel carriers, rubber-tired, self-propelled electric haulage equipment used in the active workings of underground coal mines shall be equipped with automatic emergency-parking brakes in accordance with the following schedule.

(1) On and after May 23, 1989—

(i) All new equipment ordered; and

(ii) All equipment originally furnished with or retrofitted with automatic emergency-parking brakes which meet the requirements of this section.

(2) On and after May 23, 1991, all other equipment.

(b) Automatic emergency-parking brakes shall—

(1) Be activated immediately by the emergency deenergization device required by 30 CFR 75.523-1 and 75.523-2;

(2) Engage automatically within 5.0 seconds when the equipment is deenergized;

(3) Safely bring the equipment when fully loaded to a complete stop on the maximum grade on which it is operated;

(4) Hold the equipment stationary despite any contraction of brake parts, exhaustion of any non-mechanical source of energy, or leakage; and

(5) Release only by a manual control that does not operate any other equipment function.

(c) Automatic emergency-parking brakes shall include a means in the equipment operator's compartment to—

(1) Apply the brakes manually without deenergizing the equipment; and

(2) Release and reengage the brakes without energizing the equipment.

(d) On and after November 24, 1989, rubber-tired, self-propelled electric face equipment not covered by paragraph (a) of this section shall be equipped with a means incorporated on the equipment and operable from each tramming station to hold the equipment stationary—

(1) On the maximum grade on which it is operated; and

(2) Despite any contraction of components, exhaustion of any non-mechanical source of energy, or leakage.

(e) The brake systems required by paragraphs (a) or (d) of this section shall be applied when the equipment operator is not at the controls of the equipment, except during movement of disabled equipment.

[54 FR 12412, Mar. 24, 1989]

§ 75.524 Electric face equipment; electric equipment used in return air outby the last open crosscut; maximum level of alternating or direct electric current between frames of equipment.

The maximum level of alternating or direct electric current that exists between the frames of any two units of electric face equipment that come in contact with each other in the working places of a coal mine, or between the frames of any two units of electric equipment that come in contact with each other in return air outby the last open crosscut, shall not exceed one ampere as determined from the voltage measured across a 0.1 ohm resistor connected between the frames of such equipment.

[38 FR 29998, Oct. 31, 1973]

Appendix A to Subpart F of Part 75 List of Permissible Electric Face Equipment Approved by the Bureau of Mines Prior to May 23, 1936

Motor-Driven Mine Equipment

Approval No. | Date

Air Compressors

128 | March 21, 1927.

128A | July 16, 1926.

Coal Drills and Drilling Machines

Hand Drills

109 | September 19, 1922.

154 | August 1, 1928.

184 | February 7, 1930.

227 | July 29, 1931.

254 | July 15, 1933.

Post Drills

119 | April 15, 1925.

119A | Do.

225 | July 10, 1931.

225A | Do.

228 | August 12, 1931.

228A | February 17, 1932.

230 | August 20, 1931.

230A | Do.

237 | December 1, 1931.

237A | Do.

Drilling Machines

147 | February 8, 1928.

147A | Do.

176 | September 9, 1929.

176A | Do.

Loading and Conveying Equipment

loading machines

Unmounted Type

122 | January 8, 1926.

122A | Do.

Caterpillar-Mounted Type

150 | May 11, 1928.

186 | March 15, 1930.

222 | May 8, 1931.

222A | July 28, 1931.

229 | August 17, 1931.

229A | Do.

235 | November 27, 1931.

235A | October 29, 1931.

278 | January 17, 1935.

278A | Do.

283A | March 12, 1935.

284A | Do.

285A | Do.

294 | September 18, 1935.

300A | May 6, 1936.

127 | July 16, 1926.

127A | September 23, 1927.

Track-Mounted Type

194 | June 6, 1930.

194A | Do.

217 | February 27, 1931.

217A | Do.

276 | January 11, 1935.

277 | January 17, 1935.

282A | March 12, 1935.

291A | July 3, 1935.

Pit-Car Loaders

167 | March 27, 1929.

167A | Do.

175 | July 26, 1929.

175A | June 24, 1929.

250 | December 10, 1932.

250A | Do.

252A | February 20, 1933.

Conveyors

Belt Type

236 | November 19, 1931.

287A | March 12, 1935.

296A | January 6, 1936.

Chain Type

151 | May 19, 1928.

209 | December 2, 1930.

240 | March 12, 1932.

240A | Do.

298A | March 3, 1936.

Power Units for Conveyors

265 | February 12, 1934.

265A | March 19, 1934.

390A | March 23, 1934.

Shaker Type

247 | October 21, 1932.

257A | August 11, 1933.

262A | December 8, 1933.

271 | May 20, 1935.

271A | October 17, 1934.

274A | December 13, 1934.

286A | March 12, 1935.

295 | September 20, 1935.

299A | April 9, 1936.

Scraper-type Loaders

138 | August 5, 1927.

138A | Do.

196 | September 29, 1930.

196A | July 26, 1930.

226 | July 27, 1931.

255 | July 31, 1933.

256 | Do.

Mining Machines, Machinery-Moving Equipment, Miscellaneous Trucks, and Water Spray Supply Units

mining machines

Shortwall Machines

103 | November 2, 1917.

103A | Do.

105 | February 9, 1922.

105A | Do.

106 | Do.

106A | Do.

107 | Do.

107A | Do.

108 | Do.

108A | Do.

111 | October 16, 1922.

111A | Do.

113 | November 4, 1924.

113A | Do.

114 | February 7, 1925.

114A | Do.

115 | Do.

115A | Do.

153 | July 31, 1928.

153A | Do.

193 | June 3, 1930.

193A | Do.

197 | July 31, 1930.

197A | Do.

198 | August 1, 1930.

198A | Do.

201 | September 8, 1930.

201A | Do.

204 | October 13, 1930.

204A | December 13, 1930.

223 | May 13, 1931.

223A | Do.

241 | March 18, 1932.

241A | Do.

258 | August 15, 1933.

259A | August 16, 1933.

260A | August 17, 1933.

273 | November 30, 1934.

288 | March 27, 1935.

288A | Do.

292 | September 11, 1935.

292A | Do.

293A | Do.

Longwall Machines

185 | February 24, 1930.

185A | Do.

218 | March 10, 1931.

218A | Do.

246 | August 19, 1932.

246A | Do.

261 | September 12, 1933.

Track or caterpillar mounted

112 | March 13, 1924.

112A | Do.

118 | March 12, 1925.

118A | Do.

125 | April 26, 1926.

125A | Do.

172 | April 30, 1929.

172A | Do.

188 | April 15, 1930.

188A | Do.

207 | November 14, 1930.

207A | Do.

216 | February 12, 1931.

216A | Do.

231 | August 31, 1931.

231A | Do.

242 | April 7, 1932.

244 | June 18, 1932.

244A | September 20, 1932.

253A | February 25, 1933.

267 | June 27, 1934.

268A | July 25, 1934.

269A | September 24, 1934.

280A | March 4, 1935.

297 | January 27, 1936.

297A | Do.

Mine Pumps

140 | November 1, 1927.

140A | Do.

143 | Do.

143A | Do.

144 | Do.

144A | Do.

199 | August 18, 1930.

199A | Do.

208 | November 29, 1930.

210 | December 15, 1930.

210A | Do.

211 | December 17, 1930.

211A | Do.

213 | December 29, 1930.

213A | Do.

214 | January 2, 1931.

214A | Do.

215 | Do.

215A | Do.

248 | October 31, 1932.

248A | November 23, 1932.

264 | January 31, 1934.

264A | Do.

272 | October 23, 1934.

272A | Do.

Rock-Dusting Machines

130 | November 5, 1926.

137 | July 2, 1927.

146 | January 20, 1928.

146A | April 3, 1928.

180 | October 30, 1929.

180A | January 17, 1930.

206 | November 12, 1930.

279 | February 14, 1935.

Room and Car-Spotting Hoists

116 | February 13, 1925.

116A | Do.

164 | January 21, 1931.

164A | Do.

165 | Do.

165A | Do.

169 | April 5, 1929.

169A | February 26, 1934.

190 | April 20, 1930.

251A | January 16, 1933.

263 | January 11, 1934.

266A | February 27, 1934.

Storage-Battery Locomotives and Power Trucks

(Approved under Schedules 15, 2C, 2D, and 2E)

Gathering Locomotives

1501 | October 11, 1921.

1502 | November 13, 1922.

1503 | March 24, 1923.

1505 | April 5, 1924.

1507 | August 20, 1925.

1508 | March 21, 1925.

1509 | September 25, 1925.

1511 | November 10, 1925.

1512 | November 11, 1925.

1513 | February 25, 1926.

1516 | December 28, 1926.

1517 | February 10, 1927.

1520 | May 27, 1929.

1521 | June 13, 1930.

1522 | September 12, 1930.

1523 | December 19, 1930.

1525 | July 25, 1934.

1526 | December 20, 1935.

Tandem Locomotive

1518 | November 21, 1927.

Power Trucks

1506 | May 5, 1924.

1505A | June 21, 1926.

1510C | December 31, 1926.

1514 | December 18, 1926.

1515 | December 28, 1926.

1512C | September 13, 1928.

1519C | April 6, 1929.

1524C | June 25, 1934.

Junction, Distribution, and Splice Boxes

(Approved under Schedules 2D and 2E)

Junction Boxes

400 | June 16, 1928.

400A | August 5, 1925.

401 | May 11, 1927.

401A | Do.

402 | Do.

402A | Do.

403 | April 14, 1931.

403A | Do.

405A | December 4, 1933.

Subpart G Trailing Cables
§ 75.600 Trailing cables; flame resistance.

[Statutory Provisions]

Trailing cables used in coal mines shall meet the requirements established by the Secretary for flame-resistant cables.

§ 75.600-1 Approved cables; flame resistance.

Cables shall be accepted or approved by MSHA as flame resistant.

[57 FR 61223, Dec. 23, 1992]

§ 75.601 Short circuit protection of trailing cables.

[Statutory Provisions]

Short circuit protection for trailing cables shall be provided by an automatic circuit breaker or other no less effective device approved by the Secretary of adequate current-interrupting capacity in each ungrounded conductor. Disconnecting devices used to disconnect power from trailing cables shall be plainly marked and identified and such devices shall be equipped or designed in such a manner that it can be determined by visual observation that the power is disconnected.

§ 75.601-1 Short circuit protection; ratings and settings of circuit breakers.

Circuit breakers providing short circuit protection for trailing cables shall be set so as not to exceed the maximum allowable instantaneous settings specified in this section; however, higher settings may be permitted by an authorized representative of the Secretary when he has determined that special applications are justified:

Conductor size AWG or MGM | Maximum allowable circuit breaker instantaneous setting (amperes)

14 | 50

12 | 75

10 | 150

8 | 200

6 | 300

4 | 500

3 | 600

2 | 800

1 | 1,000

1/0 | 1,250

2/0 | 1,500

3/0 | 2,000

4/0 | 2,500

250 | 2,500

300 | 2,500

350 | 2,500

400 | 2,500

450 | 2,500

500 | 2,500

§ 75.601-2 Short circuit protection; use of fuses; approval by the Secretary.

Fuses shall not be employed to provide short circuit protection for trailing cables unless specifically approved by the Secretary.

§ 75.601-3 Short circuit protection; dual element fuses; current ratings; maximum values.

Dual element fuses having adequate current-interrupting capacity shall meet the requirements for short circuit protection of trailing cables as provided in § 75.601, however, the current ratings of such devices shall not exceed the maximum values specified in this section:

Conductor size (AWG or MGM) | Single conductor cable | Two conductor cable

Ampacity | Max. fuse rating | Ampacity | Max. fuse rating

14 | 15 | 15

12 | 20 | 20

10 | 25 | 25

8 | 60 | 60 | 50 | 50

6 | 85 | 90 | 65 | 70

4 | 110 | 110 | 90 | 90

3 | 130 | 150 | 105 | 110

2 | 150 | 150 | 120 | 125

1 | 170 | 175 | 140 | 150

1/0 | 200 | 200 | 170 | 175

2/0 | 235 | 250 | 195 | 200

3/0 | 275 | 300 | 225 | 225

4/0 | 315 | 350 | 260 | 300

250 | 350 | 350 | 285 | 300

300 | 395 | 400 | 310 | 350

350 | 445 | 450 | 335 | 350

400 | 480 | 500 | 360 | 400

450 | 515 | 600 | 385 | 400

500 | 545 | 600 | 415 | 450

§ 75.602 Trailing cable junctions.

[Statutory Provision]

When two or more trailing cables junction to the same distribution center, means shall be provided to assure against connecting a trailing cable to the wrong size circuit breaker.

§ 75.603 Temporary splice of trailing cable.

[Statutory Provision]

One temporary splice may be made in any trailing cable. Such trailing cable may only be used for the next 24-hour period. No temporary splice shall be made in a trailing cable within 25 feet of the machine, except cable reel equipment. Temporary splices in trailing cables shall be made in a workmanlike manner and shall be mechanically strong and well insulated. Trailing cables or hand cables which have exposed wires or which have splices that heat or spark under load shall not be used. As used in this section, the term “splice” means the mechanical joining of one or more conductors that have been severed.

§ 75.604 Permanent splicing of trailing cables.

[Statutory Provisions]

When permanent splices in trailing cables are made, they shall be:

(a) Mechanically strong with adequate electrical conductivity and flexibility;

(b) Effectively insulated and sealed so as to exclude moisture; and

(c) Vulcanized or otherwise treated with suitable materials to provide flame-resistant qualities and good bonding to the outer jacket.

(d) Made using splice kits accepted or approved by MSHA as flame resistant.

[35 FR 17890, Nov. 20, 1970, as amended at 57 FR 61223, Dec. 23, 1992]

§ 75.605 Clamping of trailing cables to equipment.

[Statutory Provisions]

Trailing cables shall be clamped to machines in a manner to protect the cables from damage and to prevent strain on the electrical connections.

§ 75.606 Protection of trailing cables.

[Statutory Provisions]

Trailing cables shall be adequately protected to prevent damage by mobile equipment.

§ 75.607 Breaking trailing cable and power cable connections.

[Statutory Provisions]

Trailing cable and power cable connections to junction boxes shall not be made or broken under load.

Subpart H Grounding
§ 75.700 Grounding metallic sheaths, armors, and conduits enclosing power conductors.

[Statutory Provisions]

All metallic sheaths, armors, and conduits enclosing power conductors shall be electrically continuous throughout and shall be grounded by methods approved by an authorized representative of the Secretary.

§ 75.700-1 Approved methods of grounding.

Metallic sheaths, armors and conduits in resistance grounded systems where the enclosed conductors are a part of the system will be approved if a solid connection is made to the neutral conductor; in all other systems, the following methods of grounding will be approved:

(a) A solid connection to a borehole casing having low resistance to earth;

(b) A solid connection to metal waterlines having low resistance to earth;

(c) A solid connection to a grounding conductor, other than the neutral conductor of a resistance grounded system, extending to a low resistance ground field located on the surface;

(d) Any other method of grounding, approved by an authorized representative of the Secretary, which ensures that there is no difference in potential between such metallic enclosures and the earth.

§ 75.701 Grounding metallic frames, casings, and other enclosures of electric equipment.

[Statutory Provisions]

Metallic frames, casings, and other enclosures of electric equipment that can become “alive” through failure of insulation or by contact with energized parts shall be grounded by methods approved by an authorized representative of the Secretary.

§ 75.701-1 Approved methods of grounding of equipment receiving power from ungrounded alternating current power systems.

For purposes of grounding metallic frames, casings and other enclosures of equipment receiving power from ungrounded alternating current power systems, the following methods of grounding will be approved:

(a) A solid connection between the metallic frame, casing, or other metal enclosure and the grounded metallic sheath, armor, or conduit enclosing the power conductor feeding the electrical equipment enclosed;

(b) A solid connection to a borehole casing having low resistance to earth;

(c) A solid connection to metal waterlines having low resistance to earth;

(d) A solid connection to a grounding conductor extending to a low resistance ground field located on the surface;

(e) Any other method of grounding, approved by an authorized representative of the Secretary, which ensures that there is no difference in potential between such metal enclosures and the earth.

§ 75.701-2 Approved method of grounding metallic frames, casings and other enclosures receiving power from single-phase 110-220-volt circuit.

In instances where single-phase 110-220-volt circuits are used to feed electrical equipment, the only method of grounding that will be approved is the connection of all metallic frames, casings and other enclosures of such equipment to a separate grounding conductor which establishes a continuous connection to a grounded center tap of the transformer.

§ 75.701-3 Approved methods of grounding metallic frames, casings and other enclosures of electric equipment receiving power from direct current power systems with one polarity grounded.

For the purpose of grounding metallic frames, casings and enclosures of any electric equipment or device-receiving power from a direct-current power system with one polarity grounded, the following methods of grounding will be approved:

(a) A solid connection to the mine track;

(b) A solid connection to the grounded power conductor of the system;

(c) Silicon diode grounding; however, this method shall be employed only when such devices are installed in accordance with the requirements set forth in paragraph (d) of § 75.703-3; and

(d) Any other method, approved by an authorized representative of the Secretary, which insures that there is no difference in potential between such metal enclosures and the earth.

§ 75.701-4 Grounding wires; capacity of wires.

Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will be approved if:

(a) The cross-sectional area (size) of the grounding wire is at least one-half the cross-sectional area (size) of the power conductor where the power conductor used is No. 6 A.W.G., or larger.

(b) Where the power conductor used is less than No. 6 A.W.G., the cross-sectional area (size) of the grounding wire is equal to the cross-sectional area (size) of the power conductor.

§ 75.701-5 Use of grounding connectors.

The attachment of grounding wires to a mine track or other grounded power conductor will be approved if separate clamps, suitable for such purpose, are used and installed to provide a solid connection.

§ 75.702 Protection other than grounding.

[Statutory Provisions]

Methods other than grounding which provide no less effective protection may be permitted by the Secretary or his authorized representative.

§ 75.702-1 Protection other than grounding; approved by an authorized representative of the Secretary.

Under this subpart no method other than grounding may be used to ensure against a difference in potential between metallic sheaths, armors and conduits, enclosing power conductors and frames, casings and metal enclosures of electric equipment, and the earth, unless approved by an authorized representative of the Secretary.

§ 75.703 Grounding offtrack direct-current machines and the enclosures of related detached components.

[Statutory Provisions]

The frames of all offtrack direct-current machines and the enclosures of related detached components shall be effectively grounded, or otherwise maintained at no less safe voltages, by methods approved by an authorized representative of the Secretary.

§ 75.703-1 Approved method of grounding.

In instances where the metal frames both of an offtrack direct-current machine and of the metal frames of its component parts are grounded to the same grounding medium the requirements of § 75.703 will be met.

§ 75.703-2 Approved grounding mediums.

For purposes of grounding offtrack direct-current machines, the following grounding mediums are approved:

(a) The grounded polarity of the direct-current power system feeding such machines; or,

(b) The alternating current grounding medium where such machines are fed by an ungrounded direct-current power system originating in a portable rectifier receiving its power from a section power center. However, when such a medium is used, a separate grounding conductor must be employed.

§ 75.703-3 Approved methods of grounding offtrack mobile, portable and stationary direct-current machines.

In grounding offtrack direct-current machines and the enclosures of their component parts, the following methods of grounding will meet the requirements of § 75.703:

(a) The use of a separate grounding conductor located within the trailing cable of mobile and portable equipment and connected between such equipment and the direct-current grounding medium;

(b) The use of a separate ground conductor located within the direct-current power cable feeding stationary equipment and connected between such stationary equipment and the direct-current grounding medium;

(c) The use of a separate external ground conductor connected between stationary equipment and the direct-current grounding medium; or,

(d) The use of silicon diodes; however, the installation of such devices shall meet the following minimum requirements:

(1) Installation of silicon diodes shall be restricted to electric equipment receiving power from a direct-current system with one polarity grounded;

(2) Where such diodes are used on circuits having a nominal voltage rating of 250, they must have a forward current rating of 400 amperes or more, and have a peak inverse voltage rating of 400 or more;

(3) Where such diodes are used on circuits having a nominal voltage rating of 550, they must have a forward current rating of 250 amperes or more, and have a peak inverse voltage rating of 800 or more;

(4) Where fuses approved by the Secretary are used at the outby end of a trailing cable connected to electrical equipment employing silicon diodes, the rating of such fuses must not exceed 150 percent of the nominal current rating of the grounding diodes;

(5) Where circuit breakers are used at the outby end of a trailing cable connected to electrical equipment employing silicon diodes, the instantaneous trip setting shall not exceed 300 percent of the nominal current rating of the grounding diode;

(6) Overcurrent devices must be used and installed in such a manner that the operating coil circuit of the main contactor will open when a fault current with a value of 25 percent or less of the diode rating flows through the diode;

(7) The silicon diode installed must be suitable to the grounded polarity of the power system in which it is used and its threaded base must be solidly connected to the machine frame on which it is installed;

(8) In addition to the grounding diode, a polarizing diode must be installed in the machine control circuit to prevent operation of the machine when the polarity of a trailing cable is reversed;

(9) When installed on permissible equipment, all grounding diodes, overcurrent devices, and polarizing diodes must be placed in explosion proof compartments;

(10) When grounding diodes are installed on a continuous miner, their nominal diode current rating must be at least 750 amperes or more; and,

(11) All grounding diodes shall be tested, examined and maintained as electrical equipment in accordance with the provisions of § 75.512.

§ 75.703-4 Other methods of protecting offtrack direct-current equipment; approved by an authorized representative of the Secretary.

Other methods of maintaining safe voltage by preventing a difference between the frames of offtract direct-current machines and the earth must be approved by an authorized representative of the Secretary.

§ 75.704 Grounding frames of stationary high-voltage equipment receiving power from ungrounded delta systems.

[Statutory Provisions]

The frames of all stationary high-voltage equipment receiving power from ungrounded delta systems shall be grounded by methods approved by an authorized representative of the Secretary.

§ 75.704-1 Approved methods of grounding.

The methods of grounding stated in § 75.701-1 will also be approved with respect to the grounding of frames of high-voltage equipment referred to in § 75.704.

§ 75.705 Work on high-voltage lines; deenergizing and grounding.

[Statutory Provisions]

High-voltage lines, both on the surface and underground, shall be deenergized and grounded before work is performed on them, except that repairs may be permitted, in the case of energized surface high-voltage lines, if such repairs are made by a qualified person in accordance with procedures and safeguards, including, but not limited to, a requirement that the operator of such mine provide, test, and maintain protective devices in making such repairs, to be prescribed by the Secretary prior to March 30, 1970.

§ 75.705-1 Work on high-voltage lines.

(a) Section 75.705 specifically prohibits work on energized high-voltage lines underground;

(b) No high-voltage line, either on the surface or underground, shall be regarded as deenergized for the purpose of performing work on it, until it has been determined by a qualified person (as provided in § 75.153) that such high-voltage line has been deenergized and grounded. Such qualified person shall by visual observation (1) determine that the disconnecting devices on the high-voltage circuit are in open position and (2) ensure that each ungrounded conductor of the high-voltage circuit upon which work is to be done is properly connected to the system-grounding medium. In the case of resistance grounded or solid wye-connected systems, the neutral wire is the system-grounding medium. In the case of an ungrounded power system, either the steel armor or conduit enclosing the system or a surface grounding field is a system grounding medium;

(c) No work shall be performed on any high-voltage line on the surface which is supported by any pole or structure which also supports other high-voltage lines until: (1) All lines supported on the pole or structure are deenergized and grounded in accordance with all of the provisions of this section which apply to the repair of energized surface high-voltage lines; or (2) the provisions of §§ 75.705-2 through 75.705-10 have been complied with, with respect to all lines, which are supported on the pole or structure.

(d) Work may be performed on energized surface high-voltage lines only in accordance with the provisions of §§ 75.705-2 through 75.705-10, inclusive.

§ 75.705-2 Repairs to energized surface high-voltage lines.

An energized high-voltage surface line may be repaired only when

(a) The operator has determined that:

(1) Such repairs cannot be scheduled during a period when the power circuit could be properly deenergized and grounded;

(2) Such repairs will be performed on power circuits with a phase-to-phase nominal voltage no greater than 15,000 volts;

(3) Such repairs on circuits with a phase-to-phase nominal voltage of 5,000 volts or more will be performed only with the use of live line tools;

(4) Weather conditions will not interfere with such repairs or expose those persons assigned to such work to an imminent danger; and

(b) The operator has designated a person qualified under the provisions of § 75.154 as the person responsible for carrying out such repairs and such person, in order to ensure protection for himself and other qualified persons assigned to perform such repairs from the hazards of such repair, has prepared and filed with the operator:

(1) A general description of the nature and location of the damage or defect to be repaired;

(2) The general plan to be followed in making such repairs;

(3) A statement that a briefing of all qualified persons assigned to make such repairs was conducted informing them of the general plan, their individual assignments, and the dangers inherent in such assignments;

(4) A list of the proper protective equipment and clothing that will be provided; and

(5) Such other information as the person designated by the operator feels necessary to describe properly the means or methods to be employed in such repairs.

§ 75.705-3 Work on energized high-voltage surface lines; reporting.

Any operator designating and assigning qualified persons to perform repairs on energized high-voltage surface lines under the provisions of § 75.705-2 shall maintain a record of such repairs. Such record shall contain a notation of the time, date, location, and general nature of the repairs made, together with a copy of the information filed with the operator by the qualified person designated as responsible for performing such repairs.

§ 75.705-4 Simultaneous repairs.

When two or more persons are working on an energized high-voltage surface line simultaneously, and any one of them is within reach of another, such persons shall not be allowed to work on different phases or on equipment with different potentials.

§ 75.705-5 Installation of protective equipment.

Before repair work on energized high-voltage surface lines is begun, protective equipment shall be used to cover all bare conductors, ground wires, guys, telephone lines, and other attachments in proximity to the area of planned repairs. Such protective equipment shall be installed from a safe position below the conductors or other apparatus being covered. Each rubber protective device employed in the making of repairs shall have a dielectric strength of 20,000 volts, or more.

§ 75.705-6 Protective clothing; use and inspection.

All persons performing work on energized high-voltage surface lines shall wear protective rubber gloves, sleeves, and climber guards if climbers are worn. Protective rubber gloves shall not be worn wrong side out or without protective leather gloves. Protective devices worn by a person assigned to perform repairs on high-voltage surface lines shall be worn continuously from the time he leaves the ground until he returns to the ground, and, if such devices are employed for extended periods, such person shall visually inspect the equipment assigned him for defects before each use and, in no case, less than twice each day.

§ 75.705-7 Protective equipment; inspection.

Each person shall visually inspect protective equipment and clothing provided him in connection with work on high-voltage surface lines before using such equipment and clothing, and any equipment or clothing containing any defect or damage shall be discarded and replaced with proper protective equipment or clothing prior to the performance of any electrical work on such lines.

§ 75.705-8 Protective equipment; testing and storage.

(a) All rubber protective equipment used on work on energized high-voltage surface lines shall be electrically tested by the operator in accordance with ASTM standards, Part 28, published February 1968, and such testing shall be conducted in accordance with the following schedule:

(1) Rubber gloves, once each month;

(2) Rubber sleeves, once every 3 months;

(3) Rubber blankets, once every 6 months;

(4) Insulator hoods and line hose, once a year; and

(5) Other electric protective equipment, once a year.

(b) Rubber gloves shall not be stored wrong side out. Blankets shall be rolled when not in use, and line hose and insulator hoods shall be stored in their natural position and shape.

§ 75.705-9 Operating disconnecting or cutout switches.

Disconnecting or cutout switches on energized high-voltage surface lines shall be operated only with insulated sticks, fuse tongs, or pullers which are adequately insulated and maintained to protect the operator from the voltage to which he is exposed. When such switches are operated from the ground, the person operating such devices shall wear protective rubber gloves.

§ 75.705-10 Tying into energized high-voltage surface circuits.

If the work of forming an additional circuit by tying into an energized high-voltage surface line is performed from the ground, any person performing such work must wear and employ all of the protective equipment and clothing required under the provisions of §§ 75.705-5 and 75.705-6. In addition, the insulated stick used by such person must have been designed for such purpose and must be adequately insulated and be maintained to protect such person from the voltage to which he is exposed.

§ 75.705-11 Use of grounded messenger wires; ungrounded systems.

Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems may be used as a grounding medium.

§ 75.706 Deenergized underground power circuits; idle days—idle shifts.

[Statutory Provisions]

When not in use, power circuits underground shall be deenergized on idle days and idle shifts, except that rectifiers and transformers may remain energized.

Subpart I Underground High-Voltage Distribution
§ 75.800 High-voltage circuits; circuit breakers.

[Statutory Provisions]

High-voltage circuits entering the underground area of any coal mine shall be protected by suitable circuit breakers of adequate interrupting capacity which are properly tested and maintained as prescribed by the Secretary. Such breakers shall be equipped with devices to provide protection against under-voltage grounded phase, short circuit, and overcurrent.

§ 75.800-1 Circuit breakers; location.

Circuit breakers protecting high-voltage circuits entering an underground area of any coal mine shall be located on the surface and in no case installed either underground or within a drift.

§ 75.800-2 Approved circuit schemes.

The following circuit schemes will be regarded as providing the necessary protection to the circuits required by § 75.800:

(a) Ground check relays may be used for undervoltage protection if the relay coils are designed to trip the circuit breaker when line voltage decreases to 40 percent to 60 percent of the nominal line voltage;

(b) Ground trip relays on resistance grounded systems will be acceptable as grounded phase protection;

(c) One circuit breaker may be used to protect two or more branch circuits, if the circuit breaker is adjusted to afford overcurrent protection for the smallest conductor.

§ 75.800-3 Testing, examination and maintenance of circuit breakers; procedures.

(a) Circuit breakers and their auxiliary devices protecting underground high-voltage circuits shall be tested and examined at least once each month by a person qualified as provided in § 75.153;

(b) Tests shall include: (1) Breaking continuity of the ground check conductor, where ground check monitoring is used; and

(2) Actuating at least two (2) of the auxiliary protective relays.

(c) Examination shall include visual observation of all components of the circuit breaker and its auxiliary devices, and such repairs or adjustments as are indicated by such tests and examinations shall be carried out immediately.

§ 75.800-4 Testing, examination, and maintenance of circuit breakers; record.

(a) Recordkeeping. The operator shall make a record of each test, examination, repair, or adjustment of all circuit breakers protecting high-voltage circuits which enter any underground area of the mine.

(b) Record security. These records shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(c) Retention and access. These records shall be retained at a surface location at the mine for at least one year and shall be made available to authorized representatives of the Secretary, the representative of miners, and other interested persons.

[64 FR 43287, Aug. 10, 1999]

§ 75.801 Grounding resistors.

[Statutory Provisions]

The grounding resistor, where required, shall be of the proper ohmic value to limit the voltage drop in the grounding circuit external to the resistor to not more than 100 volts under fault conditions. The grounding resistor shall be rated for maximum fault current continuously and insulated from ground for a voltage equal to the phase-to-phase voltage of the system.

§ 75.802 Protection of high-voltage circuits extending underground.

(a) Except as provided in paragraph (b) of this section, high-voltage circuits extending underground and supplying portable, mobile, or, stationary high-voltage equipment shall contain either a direct or derived neutral which shall be grounded through a suitable resistor at the source transformers, and a grounding circuit, originating at the grounded side of the grounding resistor, shall extend along with the power conductors and serve as a grounding conductor for the frames of all high-voltage equipment supplied power from that circuit.

(b) Notwithstanding the requirements of paragraph (a) of this section, the Secretary or his authorized representative may permit ungrounded high-voltage circuits to be extended underground to feed stationary electric equipment if:

(1) Such circuits are either steel armored or installed in grounded, rigid steel conduit throughout their entire length; or,

(2) The voltage of such circuits is nominally 2,400 volts or less phase-to-phase and the cables used in such circuits are equipped with metallic shields around each power conductor, and contain one or more ground conductors having a total cross sectional area of not less than one-half the power conductor; and,

(3) Upon a finding by the Secretary or his authorized representative that the use of the circuits described in paragraphs (b) (1) and (2) of this section does not pose a hazard to the miners.

(c) Within 100 feet of the point on the surface where high-voltage circuits enter the underground portion of the mine, disconnecting devices shall be installed and so equipped or designed in such a manner that it can be determined by visual observation that the power is disconnected, except that the Secretary or his authorized representative may permit such devices to be installed at a greater distance from such area of the mine if he determines, based on existing physical conditions, that such installation will be more accessible at a greater distance and will not pose any hazard to the miners.

[38 FR 4975, Feb. 23, 1973]

§ 75.803 Fail safe ground check circuits on high-voltage resistance grounded systems.

[Statutory Provisions]

On and after September 30, 1970, high-voltage, resistance grounded systems shall include a fail safe ground check circuit to monitor continuously the grounding circuit to assure continuity and the fail safe ground check circuit shall cause the circuit breaker to open when either the ground or pilot check wire is broken, or other no less effective device approved by the Secretary or his authorized representative to assure such continuity, except that an extension of time, not in excess of 12 months, may be permitted by the Secretary on a mine-by-mine basis if he determines that such equipment is not available.

§ 75.803-1 Maximum voltage ground check circuits.

The maximum voltage used for ground check circuits under § 75.803 shall not exceed 96 volts.

§ 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary.

Ground check systems not employing pilot check wires will be approved only if it is determined that the system includes a fail safe design causing the circuit breaker to open when ground continuity is broken.

§ 75.804 Underground high-voltage cables.

(a) Underground high-voltage cables used in resistance grounded systems shall be equipped with metallic shields around each power conductor with one or more ground conductors having a total cross sectional area of not less than one-half the power conductor, and with an insulated external conductor not smaller than No. 8 (A.W.G.) or an insulated internal ground check conductor not smaller than No. 10 (A.W.G.) for the ground continuity check circuit.

(b) All such cables shall be adequate for the intended current and voltage. Splices made in such cables shall provide continuity of all components.

[38 FR 4976, Feb. 23, 1973]

§ 75.805 Couplers.

[Statutory Provisions]

Couplers that are used with medium-voltage or high-voltage power circuits shall be of the three-phase type with a full metallic shell, except that the Secretary may permit, under such guidelines as he may prescribe, no less effective couplers constructed of materials other than metal. Couplers shall be adequate for the voltage and current expected. All exposed metal on the metallic couplers shall be grounded to the ground conductor in the cable. The coupler shall be constructed so that the ground check continuity conductor shall be broken first and the ground conductors shall be broken last when the coupler is being uncoupled.

§ 75.806 Connection of single-phase loads.

[Statutory Provisions]

Single-phase loads, such as transformer primaries, shall be connected phase-to-phase.

§ 75.807 Installation of high-voltage transmission cables.

[Statutory Provisions]

All underground high-voltage transmission cables shall be installed only in regularly inspected air courses and haulageways, and shall be covered, buried, or placed so as to afford protection against damage, guarded where men regularly work or pass under them unless they are 6 1/2 feet or more above the floor or rail, securely anchored, properly insulated, and guarded at ends, and covered, insulated, or placed to prevent contact with trolley wires and other low-voltage circuits.

§ 75.808 Disconnecting devices.

[Statutory Provisions]

Disconnecting devices shall be installed at the beginning of branch lines in high-voltage circuits and equipped or designed in such a manner that it can be determined by visual observation that the circuit is deenergized when the switches are open.

§ 75.809 Identification of circuit breakers and disconnecting switches.

[Statutory Provisions]

Circuit breakers and disconnecting switches underground shall be marked for identification.

§ 75.810 High-voltage trailing cables; splices.

[Statutory Provisions]

In the case of high-voltage cables used as trailing cables, temporary splices shall not be used and all permanent splices shall be made in accordance with § 75.604. Terminations and splices in all other high-voltage cables shall be made in accordance with the manufacturer's specifications.

§ 75.811 High-voltage underground equipment; grounding.

[Statutory Provisions]

Frames, supporting structures and enclosures of stationary, portable, or mobile underground high-voltage equipment and all high-voltage equipment supplying power to such equipment receiving power from resistance grounded systems shall be effectively grounded to the high-voltage ground.

§ 75.812 Movement of high-voltage power centers and portable transformers; permit.

[Statutory Provisions]

Power centers and portable transformers shall be deenergized before they are moved from one location to another, except that, when equipment powered by sources other than such centers or transformers is not available, the Secretary may permit such centers and transformers to be moved while energized, if he determines that another equivalent or greater hazard may otherwise be created, and if they are moved under the supervision of a qualified person, and if such centers and transformers are examined prior to such movement by such person and found to be grounded by methods approved by an authorized representative of the Secretary and otherwise protected from hazards to the miner. A record shall be kept of such examinations. High-voltage cables, other than trailing cables, shall not be moved or handled at any time while energized, except that, when such centers and transformers are moved while energized as permitted under this section, energized high-voltage cables attached to such centers and transformers may be moved only by a qualified person and the operator of such mine shall require that such person wear approved and tested insulated wireman's gloves.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.812-1 Qualified person.

A person who meets the requirements of § 75.153 is a qualified person within the meaning of § 75.812.

§ 75.812-2 High-voltage power centers and transformers; record of examination.

The operator shall maintain a record of all examinations conducted in accordance with § 75.812. Such record shall be kept in a book approved by the Secretary.

216 High-Voltage Longwalls

Source: 67 FR 11001, Mar. 11, 2002, unless otherwise noted.

§ 75.813 High-voltage longwalls; scope.

Sections 75.814 through 75.822 of this part are electrical safety standards that apply to high-voltage longwall circuits and equipment. All other existing standards in 30 CFR must also apply to these longwall circuits and equipment where appropriate.

§ 75.814 Electrical protection.

(a) High-voltage circuits must be protected against short circuits, overloads, ground faults, and undervoltages by circuit-interrupting devices of adequate interrupting capacity as follows:

(1) Current settings of short-circuit protective devices must not exceed the setting specified in approval documentation, or seventy-five percent of the minimum available phase-to-phase short-circuit current, whichever is less.

(2) Time-delay settings of short-circuit protective devices used to protect any cable extending from the section power center to a motor-starter enclosure must not exceed the settings specified in approval documentation, or 0.25-second, whichever is less. Time delay settings of short-circuit protective devices used to protect motor and shearer circuits must not exceed the settings specified in approval documentation, or 3 cycles, whichever is less.

(3) Ground-fault currents must be limited by a neutral grounding resistor to not more than—

(i) 6.5 amperes when the nominal voltage of the power circuit is 2,400 volts or less; or

(ii) 3.75 amperes when the nominal voltage of the power circuit exceeds 2,400 volts.

(4) High-voltage circuits extending from the section power center must be provided with—

(i) Ground-fault protection set to cause deenergization at not more than 40 percent of the current rating of the neutral grounding resistor;

(ii) A backup ground-fault detection device to cause deenergization when a ground fault occurs with the neutral grounding resistor open; and

(iii) Thermal protection for the grounding resistor that will deenergize the longwall power center if the resistor is subjected to a sustained ground fault. The thermal protection must operate at either 50 percent of the maximum temperature rise of the grounding resistor, or 150 °C (302 °F), whichever is less, and must open the ground-wire monitor circuit for the high-voltage circuit supplying the section power center. The thermal protection must not be dependent upon control power and may consist of a current transformer and overcurrent relay.

(5) High-voltage motor and shearer circuits must be provided with instantaneous ground-fault protection set at not more than 0.125-ampere.

(6) Time-delay settings of ground-fault protective devices used to provide coordination with the instantaneous ground-fault protection of motor and shearer circuits must not exceed 0.25-second.

(7) Undervoltage protection must be provided by a device which operates on loss of voltage to cause and maintain the interruption of power to a circuit to prevent automatic restarting of the equipment.

(b) Current transformers used for the ground-fault protection specified in paragraphs (a)(4)(i) and (5) of this section must be single window-type and must be installed to encircle all three phase conductors. Equipment safety grounding conductors must not pass through or be connected in series with ground-fault current transformers.

(c) Each ground-fault current device specified in paragraphs (a)(4)(i) and (5) of this section must be provided with a test circuit that will inject a primary current of 50 percent or less of the current rating of the grounding resistor through the current transformer and cause each corresponding circuit-interrupting device to open.

(d) Circuit-interrupting devices must not reclose automatically.

(e) Where two or more high-voltage cables are used to supply power to a common bus in a high-voltage enclosure, each cable must be provided with ground-wire monitoring. The ground-wire monitoring circuits must cause deenergization of each cable when either the ground-monitor or grounding conductor(s) of any cable become severed or open. On or after May 10, 2002, parallel connected cables on newly installed longwalls must be protected as follows:

(1) When one circuit-interrupting device is used to protect parallel connected cables, the circuit-interrupting device must be electrically interlocked with the cables so that the device will open when any cable is disconnected; or

(2) When two or more parallel circuit-interrupting devices are used to protect parallel connected cables, the circuit-interrupting devices must be mechanically and electrically interlocked. Mechanical interlocking must cause all devices to open simultaneously and electrical interlocking must cause all devices to open when any cable is disconnected.

§ 75.815 Disconnect devices.

(a) The section power center must be equipped with a main disconnecting device installed to deenergize all cables extending to longwall equipment when the device is in the “open” position. See Figures I-1 and I-2 in Appendix A to this subpart I.

(b) Disconnecting devices for motor-starter enclosures must be maintained in accordance with the approval requirements of paragraph (f) of § 18.53 of part 18 of this chapter. The compartment for the disconnect device must be provided with a caution label to warn miners against entering the compartment before deenergizing the incoming high-voltage circuits to the compartment.

(c) Disconnecting devices must be rated for the maximum phase-to-phase voltage of the circuit in which they are installed, and for the full-load current of the circuit that is supplied power through the device.

(d) Each disconnecting device must be designed and installed so that—

(1) Visual observation determines that the contacts are open without removing any cover;

(2) All load power conductors can be grounded when the device is in the “open” position; and

(3) The device can be locked in the “open” position.

(e) Disconnecting devices, except those installed in explosion-proof enclosures, must be capable of interrupting the full-load current of the circuit or designed and installed to cause the current to be interrupted automatically prior to the opening of the contacts of the device. Disconnecting devices installed in explosion-proof enclosures must be maintained in accordance with the approval requirements of paragraph (f)(2)(iv) of § 18.53 of part 18 of this chapter.

§ 75.816 Guarding of cables.

(a) High-voltage cables must be guarded at the following locations:

(1) Where persons regularly work or travel over or under the cables.

(2) Where the cables leave cable handling or support systems to extend to electric components.

(b) Guarding must minimize the possibility of miners contacting the cables and protect the cables from damage. The guarding must be made of grounded metal or nonconductive flame-resistant material.

§ 75.817 Cable handling and support systems.

Longwall mining equipment must be provided with cable-handling and support systems that are constructed, installed and maintained to minimize the possibility of miners contacting the cables and to protect the high-voltage cables from damage.

§ 75.818 Use of insulated cable handling equipment.

(a) Energized high-voltage cables must not be handled except when motor or shearer cables need to be trained. When cables need to be trained, high-voltage insulated gloves, mitts, hooks, tongs, slings, aprons, or other personal protective equipment capable of providing protection against shock hazard must be used to prevent direct contact with the cable.

(b) High-voltage insulated gloves, sleeves, and other insulated personal protective equipment must—

(1) Have a voltage rating of at least Class 1 (7,500 volts) that meets or exceeds ASTM F496-97, “Standard Specification for In-Service Care of Insulating Gloves and Sleeves” (1997).

(2) Be examined before each use for visible signs of damage;

(3) Be removed from the underground area of the mine or destroyed when damaged or defective; and

(4) Be electrically tested every 6 months in accordance with publication ASTM F496-97. ASTM F496-97 (Standard Specification for In-Service Care of Insulating Gloves and Sleeves, 1997) is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

[67 FR 11001, Mar. 11, 2002, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 80 FR 52992, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.819 Motor-starter enclosures; barriers and interlocks.

Compartment separation and cover interlock switches for motor-starter enclosures must be maintained in accordance with the approval requirements of paragraphs (a) and (b) of § 18.53 of part 18 of this chapter.

§ 75.820 Electrical work; troubleshooting and testing.

(a) Electrical work on all circuits and equipment associated with high-voltage longwalls must be performed only by persons qualified under § 75.153 to perform electrical work on all circuits and equipment.

(b) Prior to performing electrical work, except for troubleshooting and testing of energized circuits and equipment as provided for in paragraph (d) of this section, a qualified person must do the following:

(1) Deenergize the circuit or equipment with a circuit-interrupting device.

(2) Open the circuit disconnecting device. On high-voltage circuits, ground the power conductors until work on the circuit is completed.

(3) Lock out the disconnecting device with a padlock. When more than one qualified person is performing work, each person must install an individual padlock.

(4) Tag the disconnecting device to identify each person working and the circuit or equipment on which work is being performed.

(c) Each padlock and tag must be removed only by the person who installed them, except that, if that person is unavailable at the mine, the lock and tag may be removed by a person authorized by the operator, provided—

(1) The authorized person is qualified under paragraph (a) of this section; and

(2) The operator ensures that the person who installed the lock and tag is aware of the removal before that person resumes work on the affected circuit or equipment.

(d) Troubleshooting and testing of energized circuits must be performed only—

(1) On low- and medium-voltage circuits;

(2) When the purpose of troubleshooting and testing is to determine voltages and currents; and

(3) By persons qualified to perform electrical work and who wear protective gloves on circuits that exceed 40 volts in accordance with the following table:

Circuit voltage | Type of glove required

Greater than 120 volts (nominal) (not intrinsically safe) | Rubber insulating gloves with leather protectors.

40 volts to 120 volts (nominal) (both intrinsically safe and non-intrinsically safe) | Either rubber insulating gloves with leather protectors or dry work gloves.

Greater than 120 volts (nominal) (intrinsically safe) | Either rubber insulating gloves with leather protectors or dry work gloves.

(4) Rubber insulating gloves must be rated at least for the nominal voltage of the circuit when the voltage of the circuit exceeds 120 volts nominal and is not intrinsically safe.

(e) Before troubleshooting and testing a low- or medium-voltage circuit contained in a compartment with a high-voltage circuit, the high-voltage circuit must be deenergized, disconnected, grounded, locked out and tagged in accordance with paragraph (b) of this section.

(f) Prior to the installation or removal of conveyor belt structure, high-voltage cables extending from the section power center to longwall equipment and located in the belt entries must be:

(1) Deenergized; or

(2) Guarded in accordance with § 75.816 of this part, at the location where the belt structure is being installed or removed; or

(3) Located at least 6.5 feet above the mine floor.

§ 75.821 Testing, examination and maintenance.

(a) At least once every 7 days, a person qualified in accordance with § 75.153 to perform electrical work on all circuits and equipment must test and examine each unit of high-voltage longwall equipment and circuits to determine that electrical protection, equipment grounding, permissibility, cable insulation, and control devices are being properly maintained to prevent fire, electrical shock, ignition, or operational hazards from existing on the equipment. Tests must include activating the ground-fault test circuit as required by § 75.814(c).

(b) Each ground-wire monitor and associated circuits must be examined and tested at least once each 30 days to verify proper operation and that it will cause the corresponding circuit-interrupting device to open.

(c) When examinations or tests of equipment reveal a fire, electrical shock, ignition, or operational hazard, the equipment must be removed from service immediately or repaired immediately.

(d) At the completion of examinations and tests required by this section, the person who makes the examinations and tests must certify by signature and date that they have been conducted. A record must be made of any unsafe condition found and any corrective action taken. Certifications and records must be kept for at least one year and must be made available for inspection by authorized representatives of the Secretary and representatives of miners.

§ 75.822 Underground high-voltage longwall cables.

In addition to the high-voltage cable design specifications in § 75.804 of this part, high-voltage cables for use on longwalls may be a type SHD cable with a center ground-check conductor no smaller than a No. 16 AWG stranded conductor. The cables must be MSHA accepted as flame-resistant under part 18 or approved under subpart K of part 7.

§ 75.823 Scope.

Sections 75.823 through 75.834 of this part are electrical safety standards applicable to 2,400 volt continuous mining machines and circuits. A “qualified person” as used in these sections means a person meeting the requirements of § 75.153. Other standards in 30 CFR apply to these circuits and equipment where appropriate.

[75 FR 17549, Apr. 6, 2010]

§ 75.824 Electrical protection.

(a) Trailing cable protection. The trailing cable extending to the high-voltage continuous mining machine must be protected by a circuit-interrupting device of adequate interrupting capacity and voltage that provides short-circuit, overload, ground-fault, and under-voltage protection as follows:

(1) Short-circuit protection.

(i) The current setting of the device must be the setting specified in the approval documentation or 75 percent of the minimum available phase-to-phase short-circuit current, whichever is less; and

(ii) The time-delay setting must not exceed 0.050 seconds.

(2) Ground-fault protection.

(i) Neutral grounding resistors must limit the ground-fault current to no more than 0.5 ampere.

(ii) Ground-fault devices must cause de-energization of the circuit extending to the continuous mining machine at not more than 0.125 ampere. The time-delay of the device must not exceed 0.050 seconds.

(iii) Look-ahead circuits must detect a ground-fault condition and prevent the circuit-interrupting device from closing as long as the ground-fault condition exists.

(iv) Backup ground-fault devices must cause de-energization of the circuit extending to the continuous mining machine at not more than 40 percent of the voltage developed across the neutral grounding resistor when a ground fault occurs with the neutral grounding resistor open. The time-delay setting of the backup device must not exceed 0.25 seconds.

(v) Thermal devices must detect a sustained ground-fault current in the neutral grounding resistor and must de-energize the incoming power. The device must operate at either 50 percent of the maximum temperature rise of the neutral grounding resistor or 302 °F (150 °C), whichever is less. Thermal protection must not be dependent on control power and may consist of a current transformer and over-current relay in the neutral grounding resistor circuit.

(vi) A single window-type current transformer that encircles all three-phase conductors must be used to activate the ground-fault device protecting the continuous mining machine. Equipment grounding conductors must not pass through the current transformer.

(vii) A test circuit for the ground-fault device must be provided. The test circuit must inject no more than 50 percent of the current rating of the neutral grounding resistor through the current transformer. When the test circuit is activated, the circuit-interrupting device must open.

(3) Under-voltage protection. The under-voltage device must operate on a loss of voltage, de-energize the circuit, and prevent the equipment from automatically restarting.

(b) Re-closing. Circuit-interrupting devices must not re-close automatically.

(c) Onboard Power Circuits. When a grounded-phase indicator light circuit is used and it indicates a grounded-phase fault, the following corrective actions must be taken:

(1) The machine must be moved immediately to a location with a properly supported roof; and

(2) The grounded-phase condition must be located and corrected prior to placing the continuous mining machine back into operation.

[75 FR 17549, Apr. 6, 2010]

§ 75.825 Power centers.

(a) Main disconnecting switch. The power center supplying high voltage power to the continuous mining machine must be equipped with a main disconnecting switch that, when in the open position, de-energizes input to all power transformers.

(b) Trailing cable disconnecting device. In addition to the main disconnecting switch required in paragraph (a) of this section, the power center must be equipped with a disconnecting device for each circuit that supplies power to a high-voltage continuous mining machine. A disconnecting device is defined as a disconnecting switch or a cable coupler.

(c) Disconnecting switches. Each disconnecting switch must be labeled to clearly identify the circuit it disconnects, and be designed and installed as follows:

(1) Rated for the maximum phase-to-phase voltage of the circuit;

(2) Rated for the full-load current of the circuit that is supplied power through the device.

(3) Allow for visual observation, without removing any covers, to verify that the contacts are open;

(4) Ground all power conductors on the load side when the switch is in the “open and grounded” position;

(5) Can only be locked out in the “open and grounded” position; and

(6) Safely interrupts the full-load current of the circuit or causes the current to be interrupted automatically before the disconnecting switch opens.

(d) Barriers and covers. All compartments that provide access to high-voltage circuits must have barriers and/or covers to prevent miners from contacting energized high-voltage circuits.

(e) Main disconnecting switch and control circuit interlocking. The control circuit must be interlocked with the main disconnecting switch in the power center so that:

(1) When the main disconnecting switch is in the “open” position, the control circuit can only be powered through an auxiliary switch in the “test” position; and

(2) When the main disconnecting switch is in the “closed” position, the control circuit can only be powered through an auxiliary switch in the “normal” position.

(f) Interlocks. Each cover or removable barrier providing access to high-voltage circuits must be equipped with at least two interlock switches. Except when the auxiliary switch is on the “test” position, removal of any cover or barrier that exposes energized high-voltage circuits must cause the interlock switches to automatically de-energize the incoming circuit to the power center.

(g) Emergency stop switch. The power center must be equipped with an externally accessible emergency stop switch hard-wired into the incoming ground-wire monitor circuit that de-energizes the incoming high-voltage in the event of an emergency.

(h) Grounding stick. The power center must be equipped with a grounding stick to be used prior to performing electrical work to assure that high-voltage capacitors are discharged and circuits are de-energized. The power center must have a label readily identifying the location of the grounding stick. The grounding stick must be stored in a dry location.

(i) Caution label. All compartments providing access to energized high-voltage conductors and parts must display a caution label to warn miners against entering the compartments before de-energizing incoming high-voltage circuits.

[75 FR 17549, Apr. 6, 2010]

§ 75.826 High-voltage trailing cables.

High-voltage trailing cables must:

(a) Meet existing trailing cable requirements and the approval requirements of the high-voltage continuous mining machine; and

(b) Meet existing ground-check conductor requirements (§ 75.804) or have a stranded center ground-check conductor not smaller than a No. 16 A.W.G.

[75 FR 17549, Apr. 6, 2010]

§ 75.827 Guarding of trailing cables.

(a) Guarding. (1) The high-voltage cable must be guarded in the following locations:

(i) From the power center cable coupler for a distance of 10 feet inby the power center;

(ii) From the entrance gland for a distance of 10 feet outby the last strain clamp on the continuous mining machine; and,

(iii) At any location where the cable could be damaged by moving equipment.

(2) Guarding must be constructed using nonconductive flame-resistant material or grounded metal.

(b) Suspended cables and cable crossovers. When equipment must cross any portion of the cable, the cable must be either:

(1) Suspended from the mine roof; or

(2) Protected by a cable crossover having the following specifications:

(i) A minimum length of 33 inches;

(ii) A minimum width of 17 inches;

(iii) A minimum height of 3 inches;

(iv) A minimum cable placement area of two and one half-inches (2 1/2″) high by four and one-quarter inches (4 1/4″) wide;

(v) Made of nonconductive material;

(vi) Made of material with a distinctive color. The color black must not be used; and

(vii) Made of material that has a minimum compressive strength of 6,400 pounds per square inch (psi).

[75 FR 17549, Apr. 6, 2010]

§ 75.828 Trailing cable pulling.

The trailing cable must be de-energized prior to being pulled by any equipment other than the continuous mining machine. The cable manufacturer's recommended pulling procedures must be followed when pulling the trailing cable with equipment other than the continuous mining machine.

[75 FR 17549, Apr. 6, 2010]

§ 75.829 Tramming continuous mining machines in and out of the mine and from section to section.

(a) Conditions of use. Tramming the continuous mining machine in and out of the mine and from section to section must be done in accordance with movement requirements of high-voltage power centers and portable transformers (§ 75.812) and as follows:

(1) The power source must not be located in areas where permissible equipment is required;

(2) The continuous mining machine must not be used for mining or cutting purposes, unless a power center is used in accordance with §§ 75.823 through 75.828 and §§ 75.830 through 75.833;

(3) Low-, medium-, and high-voltage cables must comply with §§ 75.600-1, 75.907, and 75.826, as applicable; and

(4) The energized high-voltage cable must be mechanically secured onboard the continuous mining machine. This provision applies only when using the power sources specified in paragraphs (c)(2) and (c)(3) of this section.

(b) Testing prior to tramming. Prior to tramming the continuous mining machine,

(1) A qualified person must activate the ground-fault and ground-wire monitor test circuits of the power sources specified in paragraph (c) of this section to assure that the corresponding circuit-interrupting device opens the circuit. Corrective actions and recordkeeping resulting from these tests must be in accordance with §§ 75.832(f) and (g).

(2) Where applicable, a person designated by the mine operator must activate the test circuit for the grounded-phase detection circuit on the continuous mining machine to assure that the detection circuit is functioning properly. Corrective actions resulting from this test must be in accordance with § 75.832(f).

(c) Power sources. In addition to the power center specified in § 75.825, the following power sources may be used to tram the continuous mining machine.

(1) Medium-voltage power source. A medium-voltage power source is a source that supplies 995 volts through a trailing cable (See Figure 1 of this section) to the continuous mining machine. The medium-voltage power source must—

(i) Not be used to back-feed the high-voltage circuits of the continuous mining machine; and

(ii) Meet all applicable requirements for medium-voltage circuits in 30 CFR 75.

(2) Step-up transformer. A step-up transformer is a transformer that steps up the low or medium voltage to high voltage (See Figure 2 in this section) and must meet the following requirements:

(i) The trailing cable supplying low or medium voltage to the step-up transformer must meet the applicable requirements of 30 CFR part 75;

(ii) The high-voltage circuit output of the step-up transformer supplying power to the continuous mining machine must meet the applicable provisions of § 75.824;

(iii) The step-up transformer enclosure must be—

(A) Securely mounted to minimize vibration on:

(1) The continuous mining machine; or

(2) A sled/cart that must be connected to the continuous mining machine by a tow-bar and be in close proximity to the mining machine.

(B) Grounded as follows:

(1) Connected to the incoming ground conductor of the low- or medium-voltage trailing cable;

(2) Bonded by a No. 1/0 A.W.G. or larger external grounding conductor to the continuous mining machine frame; and

(3) Bonded by a No. 1/0 A.W.G. or larger external grounding conductor to the metallic shell of each cable coupler.

(C) Equipped with:

(1) At least two interlock switches for each of the enclosure covers; and

(2) An external emergency stop switch to remove input power to the step-up transformer.

[75 FR 17549, Apr. 6, 2010]

§ 75.830 Splicing and repair of trailing cables.

(a) Splices and repairs. (1) Splicing means the mechanical joining of one or more severed conductors in a single length of a cable including the replacement of: Insulation, semi-conductive tape, metallic shielding, and the outer jacket(s).

(2) Repair means to fix damage to any component of the cable other than the conductor.

(3) Splices and repairs to high-voltage trailing cables must be made:

(i) Only by a qualified person trained in the proper methods of splicing and repairing high-voltage trailing cables;

(ii) In a workman-like manner;

(iii) In accordance with § 75.810; and

(iv) Using only MSHA-approved high-voltage kits that include instructions for outer-jacket repairs and splices.

(b) Splicing limitations. (1) Splicing of the high-voltage trailing cable within 35 feet of the continuous mining machine is prohibited.

(2) Only four (4) splices will be allowed at any one time for the portion of the trailing cable that extends from the continuous miner outby for a distance of 300 feet.

[75 FR 17549, Apr. 6, 2010]

§ 75.831 Electrical work; troubleshooting and testing.

(a) Trailing cable and continuous mining machine electrical work procedures. Prior to performing electrical work, other than troubleshooting and testing, on the high-voltage trailing cable or the continuous mining machine, a qualified person must de-energize the power center and follow procedures specified in paragraph (1) or (2):

(1) If a trailing cable disconnecting switch is provided:

(i) Open and ground the power conductors, lock out and tag the disconnecting switch; and

(ii) Lock out and tag the plug to the power receptacle.

(2) If a trailing cable disconnecting switch is not provided and a cable coupler is used as a disconnecting device:

(i) Remove the plug from the power receptacle and connect it to the grounding receptacle;

(ii) Lock out and tag the plug to the grounding receptacle; and

(iii) Place a dust cover over the power receptacle.

(b) Troubleshooting and testing the trailing cable. During troubleshooting and testing, the de-energized high-voltage cable may be disconnected from the power center only for that period of time necessary to locate the defective condition. Prior to troubleshooting and testing trailing cables, a qualified person must perform the following:

(1) If a trailing cable disconnecting switch is provided:

(i) Open and ground power conductors and lock out and tag the disconnecting switch;

(ii) Disconnect the plug from the power receptacle;

(iii) Lock out and tag the plug; and

(iv) Place a dust cover over the power receptacle.

(2) If a trailing cable disconnecting switch is not provided and a cable coupler is used as a disconnecting device:

(i) Remove the plug from the power receptacle and connect it to the grounding receptacle to ground the power conductors;

(ii) Remove the plug from the grounding receptacle and install a lock and tag on the plug; and

(iii) Place a dust cover over the power receptacle.

(c) Troubleshooting and testing limitations. Troubleshooting and testing energized circuits must be performed only:

(1) On low- and medium-voltage circuits;

(2) When the purpose of troubleshooting and testing is to determine voltages and currents;

(3) By qualified persons; and

(4) When using protective gloves in accordance with the following table:

Circuit voltage | Type of glove required

Greater than 120 volts (nominal) (not intrinsically safe) | Rubber insulating gloves with leather protectors.

40 volts to 120 volts (nominal) (both intrinsically safe and non-intrinsically safe) | Either rubber insulating gloves with leather protectors or dry work gloves.

Greater than 120 volts (nominal) (intrinsically safe) | Either rubber insulating gloves with leather protectors or dry work gloves.

(d) Power center electrical work procedures. Before any work is performed inside any compartment of the power center, except for troubleshooting and testing energized circuits as specified in paragraph (c) of this section, a qualified person must:

(1) De-energize affected circuits;

(2) Open the corresponding disconnecting switch, lock it out, and tag it to assure the circuit is isolated;

(3) Visually verify that the contacts of the disconnecting switch are open and grounded; and

(4) Discharge all high-voltage capacitors and circuits.

(e) Locking out and tagging responsibilities. (1) When more than one qualified person is performing electrical work, including troubleshooting and testing, each person must install an individual lock and tag. Each lock and tag must be removed only by the persons who installed them.

(2) If the person who installed the lock and tag is unavailable, the lock and tag may be removed by a person authorized by the operator, provided that:

(i) The authorized person is a qualified person; and

(ii) The mine operator assures that the person who installed the lock and tag is aware that the lock and tag have been removed.

[75 FR 17549, Apr. 6, 2010]

§ 75.832 Frequency of examinations; recordkeeping.

(a) Continuous mining machine examination. At least once every 7 days, a qualified person must examine each high-voltage continuous mining machine to verify that electrical protection, equipment grounding, permissibility, cable insulation, and control devices are properly installed and maintained.

(b) Ground-fault test circuit. At least once every 7 days, and prior to tramming the high-voltage continuous mining machine, a qualified person must activate the ground-fault test circuit to verify that it will cause the corresponding circuit-interrupting device to open.

(c) Ground-wire monitor test. At least once every 7 days, and prior to tramming the high-voltage continuous mining machine, a qualified person must examine and test each high-voltage continuous mining machine ground-wire monitor circuit to verify that it will cause the corresponding circuit-interrupting device to open.

(d) Trailing cable inspections. (1) Once each day during the shift that the continuous mining machine is first energized, a qualified person must de-energize and inspect the entire length of the high-voltage trailing cable from the power center to the continuous mining machine. The inspection must include examination of the outer jacket repairs and splices for damage, and assure guarding is provided where required.

(2) At the beginning of each shift that the continuous mining machine is energized, a person designated by the mine operator must de-energize and visually inspect the high-voltage trailing cable for damage to the outer jacket. This inspection must be conducted from the continuous mining machine to the following locations:

(i) The last open crosscut;

(ii) Within 150 feet of the working place during retreat or second mining; or

(iii) Up to 150 feet from the continuous mining machine when the machine is used in outby areas.

(e) Grounded-phase detection test. When a grounded-phase test circuit is provided on a high-voltage continuous mining machine, a person designated by the mine operator must activate the test circuit at the beginning of each production shift to assure that the detection circuit is functioning properly.

(f) Corrective action. When examinations or tests of equipment reveal a risk of fire, electrical shock, ignition, or operational hazard, the equipment must be immediately removed from service or repaired.

(g) Record of tests. (1) At the completion of examinations and tests required under paragraphs (a), (b), and (c) of this section, the person conducting the examinations and tests must:

(i) Certify by signature and date that the examinations and tests have been conducted.

(ii) Make a record of any unsafe condition found.

(2) Any corrective action(s) must be recorded by the person taking the corrective action.

(3) The record must be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or the equivalent mine official's next regularly scheduled working shift.

(4) Records must be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.

(5) Certifications and records must be kept for at least 1 year and must be made available for inspection by authorized representatives of the Secretary and representatives of miners.

[75 FR 17549, Apr. 6, 2010]

§ 75.833 Handling high-voltage trailing cables.

(a) Cable handling. (1) Miners must not handle energized trailing cables unless they are wearing high-voltage insulating gloves, which include the rubber gloves and leather outer protector gloves, or are using insulated cable handling tools that meet the requirements of paragraph (c) or (d) of this section.

(2) Miners must not handle energized high-voltage cables with any parts of their bodies except by hand in accordance with paragraph (1) above.

(b) Availability. Each mine operator must make high-voltage insulating gloves or insulated cable handling tools available to miners handling energized high-voltage trailing cables.

(c) High-voltage insulating gloves. High-voltage insulating gloves must meet the following requirements:

(1) The rubber gloves must be designed and maintained to have a voltage rating of at least Class 1 (7,500 volts) and tested every 30 days in accordance with publication ASTM F496-02a, “Standard Specification for In-Service Care of Insulating Gloves and Sleeves” (2002). The Director of the Federal Register approved this incorporation by reference in accordance with 5 U.S.C. 522(a) and 1 CFR part 51. ASTM F496-02a may be obtained from the American Society for Testing and Materials, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959, call 610-832-9500 or go to http://www.astm.org. ASTM F496-02a is available for inspection at any MSHA Coal Mine Safety and Health District Office, at the MSHA Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

(2) The rubber glove portion must be air-tested at the beginning of each shift to assure its effectiveness.

(3) Both the leather protector and rubber insulating gloves must be visually examined before each use for signs of damage or defects.

(4) Damaged rubber gloves must be removed from the underground area of the mine or destroyed. Leather protectors must be maintained in good condition or replaced.

(d) Insulated cable handling tools. Insulated cable handling tools must be:

(1) Rated and properly maintained to withstand at least 7,500 volts;

(2) Designed and manufactured for cable handling;

(3) Visually examined before each use for signs of damage or defects; and

(4) Removed from the underground area of the mine or destroyed if damaged or defective.

[75 FR 17549, Apr. 6, 2010, as amended at 80 FR 52992, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.834 Training.

In addition to existing part 48 task training, hazard training, training for qualified persons under existing § 75.153, and annual refresher training, the following specialized training shall be provided and specified in the part 48 plan:

(a) Training for miners who perform maintenance on high-voltage continuous mining machines in high-voltage safety, testing, and repair and maintenance procedures.

(b) Training for personnel who work in the vicinity of high-voltage continuous mining machines in safety procedures and precautions for moving the high-voltage machines or the trailing cables.

[75 FR 17549, Apr. 6, 2010]

Appendix A to Subpart I of Part 75 Diagrams of Inby and Outby Switching

[67 FR 11001, Mar. 11, 2002; 67 FR 18823, Apr. 17, 2002]

Subpart J Underground Low- and Medium-Voltage Alternating Current Circuits
§ 75.900 Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.

[Statutory Provisions]

Low- and medium-voltage power circuits serving three-phase alternating current equipment shall be protected by suitable circuit breakers of adequate interrupting capacity which are properly tested and maintained as prescribed by the Secretary. Such breakers shall be equipped with devices to provide protection against undervoltage, grounded phase, short circuit, and overcurrent.

§ 75.900-1 Circuit breakers; location.

Circuit breakers used to protect low-and medium-voltage circuits underground shall be located in areas which are accessible for inspection, examination, and testing, have safe roofs, and are clear of any moving equipment used in haulageways.

§ 75.900-2 Approved circuit schemes.

The following circuit schemes will be regarded as providing the necessary protection to the circuit required by § 75.900:

(a) Ground check relays may be used for undervoltage protection if the relay coils are designed to trip the circuit breaker when line voltage decreases to 40 to 60 percent of the nominal line voltage.

(b) One undervoltage device installed in the main secondary circuit at the source transformer may be used to provide undervoltage protection for each circuit that receives power from that transformer.

(c) One circuit breaker may be used to protect two or more branch circuits if the circuit breaker is adjusted to afford overcurrent protection for the smallest conductor.

(d) Circuit breakers with shunt trip, series trip or undervoltage release devices may be used if the tripping elements of such devices are selected or adjusted in accordance with the settings listed in the tables of the National Electric Code, 1968.

§ 75.900-3 Testing, examination, and maintenance of circuit breakers; procedures.

Circuit breakers protecting low- and medium-voltage alternating current circuits serving three-phase alternating current equipment and their auxiliary devices shall be tested and examined at least once each month by a person qualified as provided in § 75.153. In performing such tests, actuating any of the circuit breaker auxiliaries or control circuits in any manner which causes the circuit breaker to open, shall be considered a proper test. All components of the circuit breaker and its auxiliary devices shall be visually examined and such repairs or adjustments as are indicated by such tests and examinations shall be carried out immediately.

§ 75.900-4 Testing, examination, and maintenance of circuit breakers; record.

The operator of any coal mine shall maintain a written record of each test, examination, repair, or adjustment of all circuit breakers protecting low- and medium-voltage circuits serving three-phase alternating current equipment used in the mine. Such record shall be kept in a book approved by the Secretary.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.901 Protection of low- and medium-voltage three-phase circuits used underground.

[Statutory Provisions]

(a) Low- and medium-voltage three-phase alternating-current circuits used underground shall contain either a direct or derived neutral which shall be grounded through a suitable resistor at the power center, and a grounding circuit, originating at the grounded side of the grounding resistor, shall extend along with the power conductors and serve as a grounding conductor for the frames of all the electrical equipment supplied power from that circuit, except that the Secretary or his authorized representative may permit ungrounded low- and medium-voltage circuits to be used underground to feed such stationary electrical equipment if such circuits are either steel armored or installed in grounded rigid steel conduit throughout their entire length. The grounding resistor, where required, shall be of the proper ohmic value to limit the ground fault current to 25 amperes. The grounding resistor shall be rated for maximum fault current continuously and insulated from ground for a voltage equal to the phase-to-phase voltage of the system.

(b) Diesel-powered electrical generators used as an alternative to power centers for the purpose of moving equipment in, out, and around the mine, and to perform work in areas where permissible equipment is not required, must comply with the following:

(1) The diesel engine powering the electrical generator must be approved under 30 CFR part 7, subpart E.

(2) A grounding resistor rated for the phase-to-phase voltage of the system must be provided to limit the ground-fault current to not more than 0.5 amperes. The grounding resistor(s) must be located:

(i) Between the wye-connected generator neutral and the generator frame; (see Figure I in Appendix A to subpart J of this part) or

(ii) Between the wye-connected generator neutral and the generator frame and between the wye-connected transformer secondary and the transformer frame when an isolation transformer(s) is used and the generator is supplying power to the other equipment; (see Figure II in Appendix A to subpart J of this part) or

(iii) Between the wye-connected generator neutral and the generator frame when an auto-transformer is used. (see Figure III in Appendix A to subpart J of this part)

(3) Each three-phase output circuit of the generator must be equipped with a sensitive ground fault relay. The protective relay must be set to cause the circuit interrupting device that supplies power to the primary windings of each transformer to trip and shut down the diesel engine when a phase-to-frame fault of not more than 90 milliamperes occurs.

(4) Each three-phase output circuit that supplies power to equipment must be equipped with an instantaneous sensitive ground-fault relay that will cause its respective circuit interrupting device(s) to trip and cause shutdown of the diesel engine when a phase-to-frame fault occurs. The grounded-phase protection must be set at not more than 90 milliamps. Current transformers used for the ground-fault protection must be single window-type and must be installed to encircle all three phase conductors. Equipment safety grounding conductors must not pass through or be connected in series with ground-fault current transformers.

(5) Each three-phase circuit interrupting device must be provided with a means to provide short-circuit, overcurrent, grounded-phase, undervoltage, and ground wire monitoring protection. The instantaneous only trip unit for the circuit interrupting device(s) in use must be adjusted to trip at not more than 75 percent of the minimum available short circuit current at the point where the portable cable enters the equipment or the maximum allowable instantaneous settings specified in § 75.601-1, whichever is less.

(6) The equipment portable cable length(s) must not exceed the length(s) specified in 30 CFR part 18, appendix I, table 9, Specifications for Cables Longer than 500 Feet.

(7) Permanent label(s) listing the maximum circuit interrupting device setting(s) and maximum portable cable length(s) must be installed on each instantaneous trip unit or be maintained near each three-phase circuit interrupting device. The permanent label(s) must be maintained legibly.

(8) The circuit interrupting device that supplies three-phase power circuit(s) to the equipment being powered must be limited to the use of only one circuit interrupting device at a time when equipment is being moved in, out, and around the mine.

(9) The grounding system must include an MSHA-accepted ground wire monitor system that satisfies the requirements of § 75.902; or have a No. 1/0 or larger external grounding conductor to bond and ground the frames of all equipment to the frame of the generator.

(10) All trailing cables extending from the generator to equipment must comply with § 75.907.

(11) A strain relief device must be provided on each end of the trailing cables that extends between the generator and the piece of equipment being powered.

(12) Prior to moving each piece of equipment or performing work, a functional test of each ground fault and ground wire monitor system must be performed by a qualified electrician who meets the requirements of § 75.153. The ground-fault circuit must be tested without subjecting the circuit to an actual grounded phase condition. A record of each test must be maintained and made available to authorized representatives of the Secretary and to the miners in such mine.

[35 FR 17890, Nov. 20, 1970, as amended at 70 FR 77736, Dec. 30, 2005]

§ 75.902 Low- and medium-voltage ground check monitor circuits.

[Statutory Provisions]

On or before September 30, 1970, low- and medium-voltage resistance grounded systems shall include a fail-safe ground check circuit to monitor continuously the grounding circuit to assure continuity which ground check circuit shall cause the circuit breaker to open when either the ground or pilot check wire is broken, or other no less effective device approved by the Secretary or his authorized representative to assure such continuity, except that an extension of time, not in excess of 12 months, may be permitted by the Secretary on a mine-by-mine basis if he determines that such equipment is not available. Cable couplers shall be constructed so that the ground check continuity conductor shall be broken first and the ground conductors shall be broken last when the coupler is being uncoupled.

§ 75.902-1 Maximum voltage ground check circuits.

The maximum voltage used for such ground check circuits shall not exceed 40 volts.

§ 75.902-2 Approved ground check systems not employing pilot check wires.

Ground check systems not employing pilot check wires will be approved only if it is determined that the system includes a fail safe design causing the circuit breaker to open when ground continuity is broken.

§ 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate connections.

In grounding equipment frames of all stationary, portable or mobile equipment receiving power from resistance grounded systems separate connections shall be used when practicable.

§ 75.903 Disconnecting devices.

[Statutory Provisions]

Disconnecting devices shall be installed in conjunction with the circuit breaker to provide visual evidence that the power is disconnected.

§ 75.904 Identification of circuit breakers.

[Statutory Provisions]

Circuit breakers shall be marked for identification.

§ 75.905 Connection of single-phase loads.

[Statutory Provisions]

Single-phase loads shall be connected phase-to-phase.

§ 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires.

[Statutory Provisions]

Trailing cables for mobile equipment shall contain one or more ground conductors having a cross-sectional area of not less than one-half the power conductor, and, on September 30, 1970, an insulated conductor for the ground continuity check circuit or other no less effective device approved by the Secretary or his authorized representative to assure such continuity, except that an extension of time, not in excess of 12 months may be permitted by the Secretary on a mine-by-mine basis if he determines that such equipment is not available. Splices made in the cables shall provide continuity of all components.

§ 75.907 Design of trailing cables for medium-voltage circuits.

[Statutory Provisions]

Trailing cables for medium-voltage circuits shall include grounding conductors, a ground check conductor, and grounded metallic shields around each power conductor or a ground metallic shield over the assembly, except that on equipment employing cable reels, cables without shields may be used if the insulation is rated 2,000 volts or more.

Appendix A Appendix A to Subpart J of Part 75

[70 FR 77737, Dec. 30, 2005]

Subpart K Trolley Wires and Trolley Feeder Wires
§ 75.1000 Cutout switches.

[Statutory Provisions]

Trolley wires and trolley feeder wires, shall be provided with cutout switches at intervals of not more than 2,000 feet and near the beginning of all branch lines.

§ 75.1001 Overcurrent protection.

[Statutory Provisions]

Trolley wires and trolley feeder wires shall be provided with overcurrent protection.

§ 75.1001-1 Devices for overcurrent protection; testing and calibration requirements; records.

(a) Automatic circuit interrupting devices that will deenergize the affected circuit upon occurrence of a short circuit at any point in the system will meet the requirements of § 75.1001.

(b) Automatic circuit interrupting devices described in paragraph (a) of this section shall be tested and calibrated at intervals not to exceed six months. Testing of such devices shall include passing the necessary amount of electric current through the device to cause activation. Calibration of such devices shall include adjustment of all associated relays to ±15 percent of the indicated value. An authorized representative of the Secretary may require additional testing or calibration of these devices.

(c) A record of the tests and calibrations required by paragraph (b) of this section shall be kept, and shall be made available, upon request, to an authorized representative of the Secretary.

[38 FR 29998, Oct. 31, 1973, as amended at 60 FR 33723, June 29, 1995]

§ 75.1002 Installation of electric equipment and conductors; permissibility.

(a) Electric equipment must be permissible and maintained in a permissible condition when such equipment is located within 150 feet of pillar workings or longwall faces.

(b) Electric conductors and cables installed in or in by the last open crosscut or within 150 feet of pillar workings or longwall faces must be—

(1) Shielded high-voltage cables supplying power to permissible longwall equipment;

(2) Interconnecting conductors and cables of permissible longwall equipment;

(3) Conductors and cables of intrinsically safe circuits; and

(4) Cables and conductors supplying power to low- and medium-voltage permissible equipment.

(5) Shielded high-voltage cables supplying power to permissible continuous mining machines.

[67 FR 11004, Mar. 11, 2002, as amended at 75 FR 17553, Apr. 6, 2010]

§ 75.1003 Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires.

[Statutory Provisions]

Trolley wires, trolley feeder wires, and bare signal wires shall be insulated adequately where they pass through doors and stoppings, and where they cross other power wires and cables. Trolley wires and trolley feeder wires shall be guarded adequately:

(a) At all points where men are required to work or pass regularly under the wires;

(b) On both sides of all doors and stoppings; and

(c) At man-trip stations.

The Secretary or his authorized representatives shall specify other conditions where trolley wires and trolley feeder wires shall be adequately protected to prevent contact by any person, or shall require the use of improved methods to prevent such contact. Temporary guards shall be provided where trackmen and other persons work in proximity to trolley wires and trolley feeder wires.

§ 75.1003-1 Other requirements for guarding of trolley wires and trolley feeder wires.

Adequate precaution shall be taken to insure that equipment being moved along haulageways will not come in contact with trolley wires or trolley feeder wires.

§ 75.1003-2 Requirements for movement of off-track mining equipment in areas of active workings where energized trolley wires or trolley feeder wires are present; pre-movement requirements; certified and qualified persons.

(a) Prior to moving or transporting any unit of off-track mining equipment in areas of the active workings where energized trolley wires or trolley feeder wires are present:

(1) The unit of equipment shall be examined by a certified person to ensure that coal dust, float coal dust, loose coal oil, grease, and other combustible materials have been cleaned up and have not been permitted to accumulate on such unit of equipment; and,

(2) A qualified person, as specified in § 75.153 of this part, shall examine the trolley wires, trolley feeder wires, and the associated automatic circuit interrupting devices provided for short circuit protection to ensure that proper short circuit protection exists.

(b) A record shall be kept of the examinations required by paragraph (a) of this section, and shall be made available, upon request, to an authorized representative of the Secretary.

(c) Off-track mining equipment shall be moved or transported in areas of the active workings where energized trolley wires or trolley feeder wires are present only under the direct supervision of a certified person who shall be physically present at all times during moving or transporting operations.

(d) The frames of off-track mining equipment being moved or transported, in accordance with this section, shall be covered on the top and on the trolley wire side with fire-resistant material which has met the applicable requirements of Part 18 of Subchapter D of this chapter (Bureau of Mines Schedule 2G).

(e) Electrical contact shall be maintained between the mine track and the frames of off-track mining equipment being moved in-track and trolley entries, except that rubber-tired equipment need not be grounded to a transporting vehicle if no metal part of such rubber-tired equipment can come into contact with the transporting vehicle.

(f) A minimum vertical clearance of 12 inches shall be maintained between the farthest projection of the unit of equipment which is being moved and the energized trolley wires or trolley feeder wires at all times during the movement or transportation of such equipment; provided, however, that if the height of the coal seam does not permit 12 inches of vertical clearance to be so maintained, the following additional precautions shall be taken:

(1)(i) Except as provided in paragraph (f)(1)(ii) of this section electric power shall be supplied to the trolley wires or trolley feeder wires only from outby the unit of equipment being moved or transported.

(ii) Where direct current electric power is used and such electric power can be supplied only from inby the equipment being moved or transported, power may be supplied from inby such equipment provided a miner with the means to cut off the power, and in direct communication with persons actually engaged in the moving or transporting operation, is stationed outby the equipment being moved.

(2) The settings of automatic circuit interrupting devices used to provide short circuit protection for the trolley circuit shall be reduced to not more than one-half of the maximum current that could flow if the equipment being moved or transported were to come into contact with the trolley wire or trolley feeder wire;

(3) At all times the unit of equipment is being moved or transported, a miner shall be stationed at the first automatic circuit breaker outby the equipment being moved and such miner shall be: (i) In direct communication with persons actually engaged in the moving or transporting operation, and (ii) capable of communicating with the responsible person on the surface required to be on duty in accordance with § 75.1600-1 of this part;

(4) Where trolley phones are utilized to satisfy the requirements of paragraph (f)(3) of this section, telephones or other equivalent two-way communication devices that can readily be connected with the mine communication system shall be carried by the miner stationed at the first automatic circuit breaker outby the equipment being moved and by a miner actually engaged in the moving or transporting operation; and,

(5) No person shall be permitted to be inby the unit of equipment being moved or transported, in the ventilating current of air that is passing over such equipment, except those persons directly engaged in moving such equipment.

(g) The provisions of paragraphs (a) through (f) of this section shall not apply to units of mining equipment that are transported in mine cars, provided that no part of the equipment extends above or over the sides of the mine car.

[38 FR 29998, Oct. 31, 1973, as amended at 60 FR 33723, June 29, 1995]

Subpart L Fire Protection
§ 75.1100 Requirements.

[Statutory Provision]

Each coal mine shall be provided with suitable firefighting equipment adapted for the size and conditions of the mine. The Secretary shall establish minimum requirements of the type, quality, and quantity of such equipment.

§ 75.1100-1 Type and quality of firefighting equipment.

Firefighting equipment required under this subpart shall meet the following minimum requirements:

(a) Waterlines: Waterlines shall be capable of delivering 50 gallons of water a minute at a nozzle pressure of 50 pounds per square inch.

(b) Portable water cars: A portable water car shall be of at least 1,000 gallons capacity (500 gallons capacity for anthracite mines) and shall have at least 300 feet of fire hose with nozzles. A portable water car shall be capable of providing a flow through the hose of 50 gallons of water per minute at a nozzle pressure of 50 pounds per square inch.

(c) A portable chemical car shall carry enough chemicals to provide a fire extinguishing capacity equivalent to that of a portable water car.

(d) Portable foam-generating machines or devices: A portable foam-generating machine or device shall have facilities and equipment for supplying the machine with 30 gallons of water per minute at 30 pounds per square inch for a period of 35 minutes.

(e) Portable fire extinguisher: A portable fire extinguisher shall be either (1) a multipurpose dry chemical type containing a nominal weight of 5 pounds of dry powder and enough expellant to apply the powder or (2) a foam-producing type containing at least 2 1/2 gallons of foam-producing liquids and enough expellant to supply the foam. Only fire extinguishers approved by the Underwriters Laboratories, Inc., or Factory Mutual Research Corp., carrying appropriate labels as to type and purpose, shall be used. After March 30, 1971, all new portable fire extinguishers acquired for use in a coal mine shall have a 2A 10 BC or higher rating.

(f)(1) Except as provided in paragraph (f)(2) of this section, the fire hose shall be lined with a material having flame resistant qualities meeting requirements for hose in Bureau of Mines' Schedule 2G. The cover shall be polyester, or other material with flame-spread qualities and mildew resistance equal or superior to polyester. The bursting pressure shall be at least 4 times the water pressure at the valve to the hose inlet with the valve closed; the maximum water pressure in the hose nozzle shall not exceed 100 p.s.i.g.

(2) Fire hose installed for use in underground coal mines prior to December 30, 1970, shall be mildew-proof and have a bursting pressure at least 4 times the water pressure at the valve to the hose inlet with the valve closed, and the maximum water pressure in the hose nozzle with water flowing shall not exceed 100 p.s.i.g.

§ 75.1100-2 Quantity and location of firefighting equipment.

(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:

(i) Two portable water cars; or

(ii) Two portable chemical cars; or

(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.

(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:

(i) Two portable fire extinguishers; and

(ii) 240 pounds of rock dust in bags or other suitable containers; and

(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.

(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:

(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and

(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.

(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.

(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.

(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:

(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or

(ii) Not less than 240 pounds of bagged rock dust.

(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.

(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.

(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.

(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.

(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.

(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:

1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust

(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.

[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]

§ 75.1100-3 Condition and examination of firefighting equipment.

All firefighting equipment shall be maintained in a usable and operative condition. Chemical extinguishers shall be examined every 6 months and the date of the examination shall be written on a permanent tag attached to the extinguisher.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1101 Deluge-type water sprays, foam generators; main and secondary belt-conveyor drives.

[Statutory Provisions]

Deluge-type water sprays or foam generators automatically actuated by rise in temperature, or other no less effective means approved by the Secretary of controlling fire, shall be installed at main and secondary belt-conveyor drives.

§ 75.1101-1 Deluge-type water spray systems.

(a) Deluge-type spray systems shall consist of open nozzles attached to branch lines. The branch lines shall be connected to a waterline through a control valve operated by a fire sensor. Actuation of the control valve shall cause water to flow into the branch lines and discharge from the nozzles.

(b) Nozzles attached to the branch lines shall be full cone, corrosion resistant and provided with blow-off dust covers. The spray application rate shall not be less than 0.25 gallon per minute per square foot of the top surface of the top belt and the discharge shall be directed at both the upper and bottom surfaces of the top belt and to the upper surface of the bottom belt.

§ 75.1101-2 Installation of deluge-type sprays.

Deluge-type water spray systems shall provide protection for the belt drive and 50 feet of fire-resistant belt or 150 feet of nonfire-resistant belt adjacent to the belt drive.

§ 75.1101-3 Water requirements.

Deluge-type water spray systems shall be attached to a water supply. Water so supplied shall be free of excessive sediment and noncorrosive to the system Water pressure shall be maintained consistent with the pipe, fittings, valves, and nozzles at all times. Water systems shall include strainers with a flush-out connection and a manual shut-off valve. The water supply shall be adequate to provide flow for 10 minutes except that pressure tanks used as a source of water supply shall be of 1,000-gallon capacity for a fire-resistant belt and 3,000 gallons for a nonfire-resistant belt may be provided.

§ 75.1101-4 Branch lines.

As a part of the deluge-type water spray system, two or more branch lines of nozzles shall be installed. The maximum distance between nozzles shall not exceed 8 feet.

§ 75.1101-5 Installation of foam generator systems.

(a) Foam generator systems shall be located so as to discharge foam to the belt drive, belt takeup, electrical controls, gear reducing unit and the conveyor belt.

(b) Foam generator systems shall be equipped with a fire sensor which actuates the system, and each system shall be capable of producing and delivering the following amounts of foam within 5 minutes:

(1) At fire-resistant belt installations, an amount which will fully envelop the belt drive, belt takeup, electrical controls, gear reducing unit, and the conveyor belt over a distance of 50 feet; and,

(2) At nonfire-resistant belt installations, an amount which will fully envelop the belt drive, belt takeup electrical controls, gear reducing unit, and the conveyor belt over a distance of 150 feet.

(c) The foam generator shall be equipped with a warning device designed to stop the belt drive when a fire occurs and all such warning devices shall be capable of giving both an audible and visual signal when actuated by fire.

(d) Water, power, and chemicals required shall be adequate to maintain water or foam flow for no less than 25 minutes.

(e) Water systems shall include strainers with a flush-out connection and a manual shut-off valve.

§ 75.1101-6 Water sprinkler systems; general.

Water sprinkler systems may be installed to protect main and secondary belt-conveyor drives, however, where such systems are employed, they shall be installed and maintained in accordance with §§ 75.1101-7 through 75.1101-11.

§ 75.1101-7 Installation of water sprinkler systems; requirements.

(a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the recommendations set forth in National Fire Protection Association 1968-69 edition, Code No. 13, “Installation of Sprinkler Systems” and such systems' components shall be of a type approved by the Underwriters' Laboratories, Inc., Factory Mutual Research Corp.

(b) Each sprinkler system shall provide protection for the motor drive belt takeup, electrical controls, gear reducing unit, and the 50 feet of fire-resistant belt, or 150 feet of nonfire-resistant belt adjacent to the belt drive.

(c) The components of each water sprinkler system shall be located so as to minimize the possibility of damage by roof fall or by the moving belt and its load.

§ 75.1101-8 Water sprinkler systems; arrangement of sprinklers.

(a) At least one sprinkler shall be installed above each belt drive, belt take-up, electrical control, and gear-reducing unit, and individual sprinklers shall be installed at intervals of no more than 8 feet along all conveyor branch lines.

(b) Two or more branch lines, at least one of which shall be above the top belt and one between the top and bottom belt, shall be installed in each sprinkler system to provide a uniform discharge of water to the belt surface.

(c) The water discharge rate from the sprinkler system shall not be less than 0.25 gallon per minute per square foot of the top surface of the top belt and the discharge shall be directed at both the upper and bottom surfaces of the top belt and to the upper surface of the bottom belt. The supply of water shall be adequate to provide a constant flow of water for 10 minutes with all sprinklers functioning.

(d) Each individual sprinkler shall be activated at a temperature of not less than 150 °F. and not more than 300 °F.

(e) Water systems shall include strainers with a flush-out connection and a manual shut-off valve.

§ 75.1101-9 Back-up water system.

One fire hose outlet together with a length of hose capable of extending to the belt drive shall be provided within 300 feet of each belt drive.

§ 75.1101-10 Water sprinkler systems; fire warning devices at belt drives.

Each water sprinkler system shall be equipped with a device designed to stop the belt drive in the event of a rise in temperature and each such warning device shall be capable of giving both an audible and visual warning when a fire occurs.

§ 75.1101-11 Inspection of water sprinkler systems.

Each water sprinkler system shall be examined weekly and a functional test of the complete system shall be conducted at least once each year.

§ 75.1101-12 Equivalent dry-pipe system.

Where water sprinkler systems are installed to protect main and secondary belt conveyor drives and freezing temperatures prevail, an equivalent dry-pipe system may be installed.

§ 75.1101-13 Dry powder chemical systems; general.

Self-contained dry powder chemical systems may be installed to protect main and secondary belt conveyor drives, however, where such systems are employed, they shall be installed and maintained in accordance with the provisions of §§ 75.1101-14 through 75.1101-22.

§ 75.1101-14 Installation of dry powder chemical systems.

(a) Self-contained dry powder chemical systems shall be installed to protect each belt-drive, belt takeup, electrical-controls, gear reducing units and 50 feet of fire-resistant belt or 150 feet of non-fire-resistant belt adjacent to the belt drive.

(b) The fire-control components of each dry powder chemical system shall be a type approved by the Underwriters' Laboratories, Inc., or Factory Mutual Engineering Corp.

(c) The components of each dry powder chemical system shall be located so as to minimize the possibility of damage by roof fall or by the moving belt and its load.

§ 75.1101-15 Construction of dry powder chemical systems.

(a) Each self-contained dry powder system shall be equipped with hose or pipe lines which are no longer than necessary.

(b) Metal piping and/or hose between control valves and nozzles shall have a minimum bursting pressure of 500 p.s.i.g.

(c) Hose shall be protected by wire braid or its equivalent.

(d) Nozzles and reservoirs shall be sufficient in number to provide maximum protection to each belt, belt takeup, electrical controls, and gear reducing unit.

(e) Each belt shall be protected on the top surface of both the top and bottom belts and the bottom surface of the top belt.

§ 75.1101-16 Dry powder chemical systems; sensing and fire-suppression devices.

(a) Each self-contained dry powder chemical system shall be equipped with sensing devices which shall be designed to activate the fire-control system, sound an alarm and stop the conveyor drive motor in the event of a rise in temperature, and provision shall be made to minimize contamination of the lens of any optical sensing device installed in such system.

(b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff.

(c) Sensor systems shall include a warning indicator (or test circuit) which shows it is operative.

(d) Each fire-suppression system shall be equipped with a manually operated control valve which shall be independent of the sensor.

§ 75.1101-17 Sealing of dry powder chemical systems.

Each dry powder chemical system shall be adequately sealed to protect all components of the system from moisture dust, and dirt.

§ 75.1101-18 Dry powder requirements.

Each dry powder chemical system shall contain the following minimum amounts of multipurpose dry powder:

Belt | Dry powder, pounds

Fire resistant | 125

Non-fire resistant | 250

§ 75.1101-19 Nozzles; flow rate and direction.

The nozzles of each dry powder chemical system shall be capable of discharging all powder within 1 minute after actuation of the system and such nozzles shall be directed so as to minimize the effect of ventilation upon fire control.

§ 75.1101-20 Safeguards for dry powder chemical systems.

Adequate guards shall be provided along all belt conveyors in the vicinity of each dry powder chemical system to protect persons whose vision is restricted by a discharge of powder from the system. In addition, hand-rails shall be installed in such areas to provide assistance to those passing along the conveyor after a powder discharge.

§ 75.1101-21 Back-up water system.

One fire hose outlet together with a length of hose capable of extending to the belt drive shall be provided within 300 feet of each belt drive.

§ 75.1101-22 Inspection of dry powder chemical systems.

(a) Each dry powder chemical system shall be examined weekly and a functional test of the complete system shall be conducted at least once each year.

(b) Where the dry powder chemical system has been actuated, all components of the system shall be cleaned immediately by flushing all powder from pipes and hoses and all hose damaged by fire shall be replaced.

§ 75.1102 Slippage and sequence switches.

[Statutory Provisions]

Underground belt conveyors shall be equipped with slippage and sequence switches.

§ 75.1103 Automatic fire warning devices.

[Statutory Provisions]

On or before May 29, 1970, devices shall be installed on all such belts which will give a warning automatically when a fire occurs on or near such belt. The Secretary shall prescribe a schedule for installing fire suppression devices on belt haulageways.

§ 75.1103-1 Automatic fire sensors.

A fire sensor system shall be installed on each underground belt conveyor. Sensors so installed shall be of a type which will (a) give warning automatically when a fire occurs on or near such belt; (b) provide both audible and visual signals that permit rapid location of the fire.

§ 75.1103-2 Automatic fire sensors; approved components; installation requirements.

(a) The components of each automatic fire sensor required to be installed in accordance with the provisions of § 75.1103-1 shall be of a type and installed in a manner approved by the Secretary, or the components shall be of a type listed, approved and installed in accordance with the recommendations of a nationally recognized testing laboratory approved by the Secretary.

(b) Where applicable, and not inconsistent with these regulations, automatic fire sensors shall be installed in accordance with the recommendations set forth in National Fire Code No. 72A “Local Protective Signaling Systems” (NFPA No. 72A-1967). National Fire Code No. 72A (1967) is hereby incorporated by reference and made a part hereof. National Fire Code No. 72A is available for examination at each MSHA Coal Mine Safety and Health district office, and may be obtained from the National Fire Protection Association, 11 Tracy Drive, Avon, MA 02322; Telephone: 800-344-3555 (toll free); http://www.nfpa.org.

[37 FR 16546, Aug. 16, 1972, as amended at 71 FR 16668, Apr. 3, 2006]

§ 75.1103-3 Automatic fire sensor and warning device systems; minimum requirements; general.

Automatic fire sensor and warning device systems installed in belt haulageways of underground coal mines shall be assembled from components which meet the minimum requirements set forth in §§ 75.1103-4 through 75.1103-7 unless otherwise approved by the Secretary.

[37 FR 16545, Aug. 16, 1972]

§ 75.1103-4 Automatic fire sensor and warning device systems; installation; minimum requirements.

(a) Effective December 31, 2009, automatic fire sensor and warning device systems that use carbon monoxide sensors shall provide identification of fire along all belt conveyors.

(1) Carbon monoxide sensors shall be installed at the following locations:

(i) Not more than 100 feet downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the distance between the units is less than 100 feet, they may be monitored with one sensor downwind of the last component. If the distance between the units exceeds 100 feet, additional sensors are required downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up;

(ii) Not more than 100 feet downwind of each section loading point;

(iii) Along the belt entry so that the spacing between sensors does not exceed 1,000 feet. Where air velocities are less than 50 feet per minute, spacing must not exceed 350 feet; and

(iv) The mine operator shall indicate the locations of all carbon monoxide sensors on the mine maps required by §§ 75.1200 and 75.1505 of this part.

(2) Where used, sensors responding to radiation, smoke, gases, or other indications of fire, shall be spaced at regular intervals to provide protection equivalent to carbon monoxide sensors, and installed within the time specified in paragraph (a)(3) of this section.

(3) When the distance from the tailpiece at loading points to the first outby sensor reaches the spacing requirements in § 75.1103-4(a)(1)(iii), an additional sensor shall be installed and put in operation within 24 production shift hours. When sensors of the kind described in paragraph (a)(2) of this section are used, they shall be installed and put in operation within 24 production shift hours after the equivalent distance which has been established for the sensor from the tailpiece at loading points to the first outby sensor is first reached.

(b) Automatic fire sensor and warning device systems shall be installed so as to minimize the possibility of damage from roof falls and the moving belt and its load. Sensors must be installed near the center in the upper third of the entry, in a manner that does not expose personnel working on the system to unsafe conditions. Sensors must not be located in abnormally high areas or in other locations where air flow patterns do not permit products of combustion to be carried to the sensors.

(c) Infrared, ultraviolet, and other sensors whose effectiveness is impaired by contamination shall be protected from dust, dirt, and moisture.

(d) The voltage of automatic fire sensor and warning device systems shall not exceed 120 volts.

(e) Except when power must be cut off in the mine under the provisions of § 75.313, automatic fire sensor and warning device systems shall be capable of giving warning of fire for a minimum of 4 hours after the source of power to the belt is removed unless the belt haulageway is examined for hot rollers and fire as provided in paragraph (e) (1) or (2) of this section.

(1) When an unplanned removal of power from the belt occurs an examination for hot rollers and fire in the operating belts of a conveyor system shall be completed within 2 hours after the belt has stopped.

(2) When a preplanned removal of power from the belt occurs an examination for hot rollers and fire on the operating belts of a conveyor system may commence not more than 30 minutes before the belts are stopped and shall be completed within 2 hours after the examination is commenced, or the examination shall be commenced when the belts are stopped and completed within 2 hours after the belts are stopped.

[37 FR 16545, Aug. 16, 1972, as amended at 57 FR 20928, May 15, 1992; 73 FR 80614, Dec. 31, 2008]

§ 75.1103-5 Automatic fire warning devices; actions and response.

(a) When the carbon monoxide level reaches 10 parts per million above the established ambient level at any sensor location, automatic fire sensor and warning device systems shall provide an effective warning signal at the following locations:

(1) At working sections and other work locations where miners may be endangered from a fire in the belt entry.

(2) At a manned surface location where personnel have an assigned post of duty. The manned surface location must have:

(i) A telephone or equivalent communication with all miners who may be endangered and

(ii) A map or schematic that shows the locations of sensors, and the intended air flow direction at these locations. This map or schematic must be updated within 24 hours of any change in this information.

(3) The automatic fire sensor and warning device system shall be monitored for a period of 4 hours after the belt is stopped, unless an examination for hot rollers and fire is made as prescribed in § 75.1103-4(e).

(b) The fire sensor and warning device system shall include a means for rapid evaluation of electrical short and open circuits, ground faults, pneumatic leaks, or other defect detrimental to its proper operational condition.

(c) Automatic fire sensor and warning devices shall include a manual reset feature.

(d) When a malfunction or warning signal is received at the manned surface location, the sensors that are activated must be identified and appropriate personnel immediately notified.

(e) Upon notification of a malfunction or warning signal, appropriate personnel must immediately initiate an investigation to determine the cause of the malfunction or warning signal and take the required actions set forth in paragraph (f) of this section.

(f) If any sensor indicates a warning, the following actions must be taken unless the mine operator determines that the signal does not present a hazard to miners:

(1) Appropriate personnel must notify miners in affected working sections, in affected areas where mechanized mining equipment is being installed or removed, and at other locations specified in the approved mine emergency evacuation and firefighting program of instruction; and

(2) All miners in the affected areas, unless assigned emergency response duties, must be immediately withdrawn to a safe location identified in the mine emergency evacuation and firefighting program of instruction.

(g) If the warning signal will be activated during calibration of sensors, personnel manning the surface location must be notified prior to and upon completion of calibration. Affected working sections, areas where mechanized mining equipment is being installed or removed, or other areas designated in the approved emergency evacuation and firefighting program of instruction must be notified at the beginning and completion of calibration.

(h) If any fire detection component becomes inoperative, immediate action must be taken to repair the component. While repairs are being made, operation of the belt may continue if the following requirements are met:

(1) If one sensor becomes inoperative, a trained person must continuously monitor for carbon monoxide at the inoperative sensor;

(2) If two or more adjacent sensors become inoperative, trained persons must patrol and continuously monitor the affected areas for carbon monoxide so that they will be traveled each hour in their entirety. Alternatively, a trained person must be stationed at each inoperative sensor to monitor for carbon monoxide;

(3) If the complete fire detection system becomes inoperative, trained persons must patrol and continuously monitor the affected areas for carbon monoxide so that they will be traveled each hour in their entirety;

(4) Trained persons who conduct monitoring under this section must have two-way voice communication capability, at intervals not to exceed 2,000 feet, and must report carbon monoxide concentrations to the surface at intervals not to exceed one hour;

(5) Trained persons who conduct monitoring under this section must immediately report to the surface any concentration of carbon monoxide that reaches 10 parts per million above the established ambient level, unless the mine operator knows that the source of the carbon monoxide does not present a hazard to miners; and

(6) Handheld detectors used to monitor the belt entry under this section must have a detection level equivalent to that of the system's carbon monoxide sensors.

[37 FR 16545, Aug. 16, 1972, as amended at 73 FR 80615, Dec. 31, 2008]

§ 75.1103-6 Automatic fire sensors; actuation of fire suppression systems.

Point-type heat sensors or automatic fire sensor and warning device systems may be used to actuate deluge-type water systems, foam generator systems, multipurpose dry-powder systems, or other equivalent automatic fire suppression systems.

[73 FR 80615, Dec. 31, 2008]

§ 75.1103-7 Electrical components; permissibility requirements.

The electrical components of each automatic fire sensor and warning device system shall:

(a) Remain functional when the power circuits are deenergized as required by § 75.706; and

(b) Be provided with protection against ignition of methane or coal dust when the electrical power is deenergized as required by § 75.313, but these components shall be permissible or intrinsically safe if installed in a return airway.

[37 FR 16546, Aug. 16, 1972, as amended at 57 FR 20929, May 15, 1992]

§ 75.1103-8 Automatic fire sensor and warning device systems; examination and test requirements.

(a) Automatic fire sensor and warning device systems shall be examined at least once each shift when belts are operated as part of a production shift. A functional test of the warning signals shall be made at least once every seven days. Examination and maintenance of such systems shall be by a qualified person.

(b) A record of the functional test conducted in accordance with paragraph (a) of this section shall be maintained by the operator and kept for a period of one year.

(c) Sensors shall be calibrated in accordance with the manufacturer's calibration instructions at intervals not to exceed 31 days. A record of the sensor calibrations shall be maintained by the operator and kept for a period of one year.

[73 FR 80615, Dec. 31, 2008]

§ 75.1103-9 Minimum requirements; fire suppression materials and location; maintenance of entries and crosscuts; access doors; communications; fire crews; high-expansion foam devices.

(a) The following materials shall be stored within 300 feet of each belt drive or at a location where the material can be moved to the belt drive within 5 minutes, except that when the ventilating current in the belt haulageway travels in the direction of the normal movement of coal on the belt, the materials shall be stored within 300 feet of the belt tailpiece or at a location where the materials can be moved to the belt tailpiece within 5 minutes.

(1) 500 feet of fire hose, except that if the belt flight is less than 500 feet in length the fire hose may be equal to the length of the belt flight. A high expansion foam device may be substituted for 300 feet of the 500 feet of the fire hose. Where used, such foam generators shall produce foam sufficient to fill 100 feet of the belt haulageway in not more than 5 minutes. Sufficient power cable and water hose shall be provided so that the foam generator can be installed at any crosscut along the belt by which the generator is located. A 1-hour supply of foam producing chemicals and tools and hardware required for its operation shall be stored at the foam generator.

(2) Tools to open a stopping between the belt entry and the adjacent intake entry; and

(3) 240 pounds of bagged rock dust.

(b) The entry containing the main waterline and the crosscuts containing water outlets between such entry and the belt haulageway (if the main waterline is in an adjacent entry) shall be maintained accessible and in safe condition for travel and firefighting activities. Each stopping in such crosscuts or adjacent crosscuts shall have an access door.

(c) Suitable communication lines extending to the surface shall be provided in the belt haulageway or adjacent entry.

(d) The fire suppression system required at the belt drive shall include the belt discharge head.

(e) A crew consisting of at least five members for each working shift shall be trained in firefighting operations. Fire drills shall be held at intervals not exceeding 6 months.

[37 FR 16546, Aug. 16, 1972]

§ 75.1103-10 Fire suppression systems; additional requirements.

For each conveyor belt flight exceeding 2,000 feet in length, where the average air velocity along the belt haulage entry exceeds 100 feet per minute, an additional cache of the materials specified in § 75.1103-9(a)(1), (2), and (3) shall be provided. The additional cache may be stored at the locations specified in § 75.1103-9(a), or at some other strategic location readily accessible to the conveyor belt flight.

[73 FR 80616, Dec. 31, 2008]

§ 75.1103-11 Tests of fire hydrants and fire hose; record of tests.

Each fire hydrant shall be tested by opening to insure that it is in operating condition, and each fire hose shall be tested, at intervals not exceeding 1 year. A record of these tests shall be maintained at an appropriate location.

[37 FR 16546, Aug. 16, 1972]

§ 75.1104 Underground storage, lubricating oil and grease.

[Statutory Provisions]

Underground storage places for lubricating oil and grease shall be of fireproof construction. Except for specially prepared materials approved by the Secretary, lubricating oil and grease kept in all underground areas in a coal mine shall be in fireproof, closed metal containers or other no less effective containers approved by the Secretary.

§ 75.1106 Welding, cutting, or soldering with arc or flame underground.

[Statutory Provisions]

All welding, cutting, or soldering with arc or flame in all underground areas of a coal mine shall, whenever practicable, be conducted in fireproof enclosures. Welding, cutting, or soldering with arc or flame in other than a fireproof enclosure shall be done under the supervision of a qualified person who shall make a diligent search for fire during and after such operations and shall, immediately before and during such operations, continuously test for methane with means approved by the Secretary for detecting methane. Welding, cutting, or soldering shall not be conducted in air that contains 1.0 volume per centum or more of methane. Rock dust or suitable fire extinguishers shall be immediately available during such welding, cutting or soldering.

§ 75.1106-1 Test for methane.

Until December 31, 1970, a permissible flame safety lamp may be used to make tests for methane required by the regulations in this part. On and after December 31, 1970 a methane detector approved by the Secretary shall be used for such tests and a permissible flame safety lamp may be used as a supplemental testing device. A person qualified to test for methane under § 75.151 will be a qualified person for the purpose of this section.

Transportation, Handling and Storage of Liquefied and Nonliquefied Compressed Gas Cylinders

§ 75.1106-2 Transportation of liquefied and nonliquefied compressed gas cylinders; requirements.

(a) Liquefied and nonliquefied compressed gas cylinders transported into or through an underground coal mine shall be:

(1) Placed securely in devices designed to hold the cylinder in place during transit on self-propelled equipment or belt conveyors;

(2) Disconnected from all hoses and gages;

(3) Equipped with a metal cap or “headband” (fence-type metal protector around the valve stem) to protect the cylinder valve during transit; and,

(4) Clearly labeled “empty” or “MT” when the gas in the cylinder has been expended.

(b) In addition to the requirements of paragraph (a) of this section, when liquefied and nonliquefied compressed gas cylinders are transported by a trolley wire haulage system into or through an underground coal mine, such cylinders shall be placed in well insulated and substantially constructed containers which are specifically designed for holding such cylinders.

(c) Liquefied and nonliquefied compressed gas cylinders shall not be transported on mantrips.

[36 FR 22061, Nov. 19, 1971]

§ 75.1106-3 Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

(a) Liquefied and nonliquefied compressed gas cylinders stored in an underground coal mine shall be:

(1) Clearly marked and identified as to their contents in accordance with Department of Transportation regulations.

(2) Placed securely in storage areas designated by the operator for such purpose, and where the height of the coalbed permits, in an upright position, preferably in specially designated racks, or otherwise secured against being accidently tipped over.

(3) Protected against damage from falling material, contact with power lines and energized electrical equipment, heat from welding, cutting or soldering, and exposure to flammable liquids.

(b) Liquefied and nonliquefied compressed gas cylinders shall not be stored or left unattended in any area inby the last open crosscut of an underground coal mine.

(c) When not in use, the valves of all liquefied and nonliquefied compressed gas cylinders shall be in the closed position, and all hoses shall be removed from the cylinder.

[36 FR 22061, Nov. 19, 1971]

§ 75.1106-4 Use of liquefied and nonliquefied compressed gas cylinders; general requirements.

(a) Persons assigned by the operator to use and work with liquefied and nonliquefied compressed gas shall be trained and designated by the operator as qualified to perform the work to which they are assigned, and such qualified persons shall be specifically instructed with respect to the dangers inherent in the use of such gases in an underground coal mine.

(b) Persons who perform welding, cutting, or burning operations shall wear clothing free from excessive oil or grease.

(c) Liquefied and nonliquefied compressed gas shall be used only in well-ventilated areas.

(d) Not more than one liquefied or nonliquefied compressed gas unit, consisting of one oxygen cylinder and one additional gas cylinder, shall be used to repair any unit of equipment which is inby the loading point of any section.

(e) Where liquefied and nonliquefied compressed gas is used regularly in underground shops or other underground structures, such shops or structures shall be on a separate split of air.

(f) Where liquefied and nonliquefied compressed gas is used in any area in which oil, grease, or coal dust is present, oil and grease deposits shall, where practicable, be removed and the entire area within 10 feet of the worksite covered with a heavy coating of rock dust.

(g) Liquefied and nonliquefied compressed gas cylinders shall be located no less than 10 feet from the worksite, and where the height of the coal seam permits, they shall be placed in an upright position and chained or otherwise secured against falling.

(h) Liquefied and nonliquefied compressed gas shall not be used under direct pressure from the cylinder and, where such gases are used under reduced pressure, the pressure level shall not exceed that recommended by the manufacturer.

(i) “Manifolding cylinders” shall only be performed in well-ventilated shops where the necessary equipment is properly installed and operated in accordance with specifications for safety prescribed by the manufacturer.

[36 FR 22061, Nov. 19, 1971]

§ 75.1106-5 Maintenance and tests of liquefied and nonliquefied compressed gas cylinders; accessories and equipment; requirements.

(a) Hose lines, gages, and other cylinder accessories shall be maintained in a safe operating condition.

(b) Defective cylinders, cylinder accessories, torches, and other welding, cutting, and burning equipment shall be labeled “defective” and taken out of service.

(c) Each qualified person assigned to perform welding, cutting, or burning with liquefied and nonliquefied compressed gas shall be equipped with a wrench specifically designed for use with liquefied and nonliquefied compressed gas cylinders and a suitable torchtip cleaner to maintain torches in a safe operating condition.

(d) Tests for leaks on the hose valves or gages of liquefied and nonliquefied compressed gas cylinders shall only be made with a soft brush and soapy water or soap suds, or other device approved by the Secretary.

[36 FR 22062, Nov. 19, 1971]

§ 75.1106-6 Exemption of small low pressure gas cylinders containing nonflammable or nonexplosive gas mixtures.

Small low pressure gas cylinders containing nonflammable or nonexplosive gas mixtures, which provide for the emission of such gas under a pressure reduced from a pressure which does not exceed 250 p.s.i.g., and which is manufactured and sold in conformance with U.S. Department of Transportation Special Permit No. 6029 as a calibration test kit for methane monitoring systems, shall be exempt from the requirements of §§ 75.1106-2(c) and 75.1106-4(d), (f) and (g).

[36 FR 22062, Nov. 19, 1971]

217 Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment
§ 75.1107 Fire suppression devices.

[Statutory Provisions]

On and after March 30, 1971, fire-suppression devices meeting specifications prescribed by the Secretary shall be installed on unattended underground equipment and suitable fire-resistant hydraulic fluids approved by the Secretary shall be used in the hydraulic systems of such equipment. Such fluids shall be used in the hydraulic systems of other underground equipment unless fire suppression devices meeting specifications prescribed by the Secretary are installed on such equipment.

§ 75.1107-1 Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

(a)(1) Unattended electrically powered equipment used underground which uses hydraulic fluid shall use approved fire-resistant hydraulic fluid.

(2) Except as provided in paragraph (a) (3) of this section, within 24 production shift hours after being installed, unattended electrically powered equipment used underground shall be equipped with a fire suppression device which meets the applicable requirements of §§ 75.1107-3 through 75.1107-16.

(3) Unattended enclosed motors, controls, transformers, rectifiers, and other similar noncombustible electrically powered equipment containing no flammable fluid may be protected:

(i) By an approved fire suppression device, or

(ii) Be located at least 2 feet from coal or other combustible materials, or

(iii) Be separated from the coal or combustible materials by a 4-inch-thick masonry firewall or equivalent; and be mounted on a minimum 4-inch-thick noncombustible surface, platform, or equivalent. The electrical cables at such equipment shall conform with the requirements of Part 18 of this chapter (Bureau of Mines Schedule 2G) or be in metal conduit.

(b) Attended electrically powered equipment used underground which uses hydraulic fluid shall use approved fire-resistant hydraulic fluid unless such equipment is protected by a fire suppression device which meets the applicable requirements of §§ 75.1107-3—75.1107-16.

(c) For purpose of §§ 75.1107—75.1107-16 the following underground equipment shall be considered attended equipment:

(1) Any machine or device regularly operated by a miner assigned to operate such machine or device;

(2) Any machine or device which is mounted in the direct line of sight of a jobsite which is located within 500 feet of such machine or device and which jobsite is regularly occupied by a miner assigned to perform job duties at such jobsite during each production shift.

(d) Machines and devices described under paragraph (c) of this section must be inspected for fire and the input powerline deenergized when workmen leave the area for more than 30 minutes.

[37 FR 15301, July 29, 1972]

§ 75.1107-2 Approved fire-resistant hydraulic fluids; minimum requirements.

Fire-resistant hydraulic fluids and concentrates required to be employed in the hydraulic system of underground equipment in accordance with the provisions of § 75.1107-1 shall be considered suitable only if they have been produced under an approval, or any modification thereof, issued pursuant to Part 35 Subchapter I of this chapter (Bureau of Mines Schedule 30), or any revision thereof.

[37 FR 15301, July 29, 1972]

§ 75.1107-3 Fire suppression devices; approved components; installation requirements.

(a) The components of each fire suppression device required to be installed in accordance with the provisions of § 75.1107-1 shall be approved by the Secretary, or where appropriate be listed as approved by a nationally recognized agency approved by the Secretary.

(b) Where used, pressure vessels shall conform with the requirements of sections 3603, 3606, 3607, 3707, and 3708 of National Fire Code No. 22 “Water Tanks for Private Fire Protection” (NFPA No. 22-1971).

(c) The cover of hose of fire suppression devices, if used on the protected equipment and installed after the effective date of this section, shall meet the flame-resistant requirements of Part 18 of this chapter (Bureau of Mines Schedule 2G).

(d) Fire suppression devices required to be installed in accordance with the provisions of § 75.1107-1 shall where appropriate be installed in accordance with the manufacturer's specifications.

[37 FR 15301, July 29, 1972]

§ 75.1107-4 Automatic fire sensors and manual actuators; installation; minimum requirements.

(a)(1) Where fire suppression devices are installed on unattended underground equipment, one or more point-type sensors or equivalent shall be installed for each 50 square feet of top surface area, or fraction thereof, of such equipment, and each sensor shall be designed to activate the first suppression system and disconnect the electrical power source to the equipment protected, and, except where sprinklers are used, there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used, provision shall be made for manual application of water to the protected equipment in lieu of a manual actuator.

(2) Two or more manual actuators, where practicable, shall be installed, as provided in paragraphs (a)(2) (i) and (ii) of this section, to activate fire suppression devices on attended equipment purchased on or after the effective date of this § 75.1107-4. At least one manual actuator shall be used on equipment purchased prior to the effective date of this § 75.1107-4.

(i) Manual actuators installed on attended equipment regularly operated by a miner, as provided in § 75.1107-1(c)(1) shall be located at different locations on the equipment, and at least one manual actuator shall be located within easy reach of the operator's normal operating position.

(ii) Manual actuators to activate fire suppression devices on attended equipment not regularly operated by a miner, as provided in § 75.1107-1(c)(2), shall be installed at different location, and at least one manual actuator shall be installed so as to be easily reached by the miner at the jobsite or by persons approaching the equipment.

(b) Sensors shall, where practicable, be installed in accordance with the recommendations set forth in National Fire Code No. 72A “Local Protective Signaling Systems” (NFPA No. 72A-1967).

(c) On unattended equipment the fire suppression device shall operate independently of the power to the main motor (or equivalent) so it will remain operative if the circuit breakers (or other protective device) actuates. On attended equipment powered through a trailing cable the fire suppression device shall operate independently of the electrical power provided by the cable.

(d) Point-type sensors (such as thermocouple, bimetallic strip, or rate of temperature rise) located in ventilated passageways shall be installed downwind from the equipment to be protected.

(e) Sensor systems shall include a device or method for determining their operative condition.

[37 FR 15301, July 29, 1972]

§ 75.1107-5 Electrical components of fire suppression devices; permissibility requirements.

The electrical components of each fire suppression device used on permissible equipment inby the last open crosscut or on equipment in the return airways of any coal mine shall be permissible or intrinsically safe and such components shall be maintained in permissible or intrinsically safe condition.

[37 FR 15302, July 29, 1972]

§ 75.1107-6 Capacity of fire suppression devices; location and direction of nozzles.

(a) Each fire suppression device shall be:

(1) Adequate in size and capacity to extinguish potential fires in or on the equipment protected; and

(2) Suitable for the atmospheric conditions surrounding the equipment protected (e.g., air velocity, type, and proximity of adjacent combustible material); and

(3) Rugged enough to withstand rough usage and vibration when installed on mining equipment.

(b) The extinguishant-discharge nozzles of each fire suppression device shall, where practicable, be located so as to take advantage of mine ventilation air currents. The fire suppression device may be of the internal injection, inundating, or combination type. Where fire control is achieved by internal injection, or combination of internal injection and inundation, hazardous locations shall be enclosed to minimize runoff and overshoot of the extinguishing agent and the extinguishing agent shall be directed onto:

(1) Cable reel compartments and electrical cables on the equipment which are subject to flexing or to external damage; and

(2) All hydraulic components on the equipment which are exposed directly to or located in the immediate vicinity of electrical cables which are subject to flexing or to damage.

[37 FR 15302, July 29, 1972]

§ 75.1107-7 Water spray devices; capacity; water supply; minimum requirements.

(a) Where water spray devices are used on unattended underground equipment the rate of flow shall be at least 0.25 gallon per minute per square foot over the top surface area of the equipment and the supply of water shall be adequate to provide the required flow of water for 10 minutes.

(b) Where water spray devices are used for inundating attended underground equipment the rate of flow shall be at least 0.18 gallon per minute per square foot over the top surface area of the equipment (excluding conveyors, cutters, and gathering heads), and the supply of water shall be adequate to provide the required flow of water for 10 minutes.

(c) Where water is used for internal injection on attended equipment the total quantity of water shall be at least 4.5 gallons times the number of hazardous locations; however, the total minimum amount of water shall not be less than the following:

Type of equipment | Water in gallons

(1) Cutting machines | 36

(2) Continuous miners | 36

(3) Haulage vehicles | 22.5

(4) All other attended equipment | 18.0

The rate of flow shall be not less than 7 gallons per minute.

(d) Where water is used in a combination internal injection and inundation system on attended equipment the rate of flow shall be at least 0.12 gallon per minute per square foot over the top surface area of the equipment (excluding conveyors, cutters, and gathering heads), and the supply of water shall be adequate to provide the required flow of water for 10 minutes.

(e) On equipment provided with a cable reel and an internal injection or combination-type system, the amount of water discharged into the cable reel compartments shall be approximately 25 percent of the amount required to be discharged by the system, however, such quantity need not exceed 10 gallons.

(f) Liquid chemicals may be used, as approved by the Secretary in self-contained fire suppression devices. Such liquid chemicals shall be nontoxic and when applied to a fire shall not produce excessive toxic compounds. The quantity of liquid chemicals required shall be proportionately less than water as based on equivalency ratings established by the Secretary or equivalency ratings made by a nationally recognized agency approved by the Secretary.

[37 FR 15302, July 29, 1972]

§ 75.1107-8 Fire suppression devices; extinguishant supply systems.

(a) Fire suppression systems using water or liquid chemical to protect attended equipment shall:

(1) Be maintained at a pressure consistent with the pipe, fittings, valves, and nozzles used in the system.

(2) Be located so as to be protected against damage during operation of the equipment protected.

(3) Employ liquid which is free from excessive sediment and noncorrosive to the system.

(4) Include strainers equipped with flush-out connections or equivalent protective devices and a rising stem or other visual indicator-type shutoff valve.

(b) Water supplies for fire suppression devices installed on underground equipment may be maintained in mounted water tanks or by connection to water mains. Such water supplies shall be continuously connected to the fire suppression device whenever the equipment is connected to a power source, except for a reasonable time for changing hose connections to hydrants while the machine is stopped in a ventilated passageway.

[37 FR 15302, July 29, 1972]

§ 75.1107-9 Dry chemical devices; capacity; minimum requirements.

(a) Dry chemical fire extinguishing systems used on underground equipment shall be of the multipurpose powder-type and shall include the following:

(1) The system including all hose and nozzles shall be protected against the entrance of moisture, dust, or dirt;

(2) The system shall be guarded against damage during operation of the equipment protected;

(3) Hose and pipe shall be as short as possible; the distance between the chemical container and furthest nozzle shall not exceed 50 feet;

(4) Hose, piping, and fittings between the actuator and the chemical container shall have a bursting pressure of 500 pounds per square inch (gage) or higher; the hose, piping, and fittings between the chemical container and the nozzles shall have a bursting pressure of 300 pounds per square inch (gage) or higher and

(5) The system shall discharge in 1 minute or less, for quantities less than 50 pounds (nominal) 1 and in less than 2 minutes for quantities more than 50 pounds;

1 Many dry chemical systems were originally designed for sodium bicarbonate before all-purpose chemical (ammonium phosphate) was shown to be more effective. Sodium bicarbonate is denser than ammonium phosphate; hence, for example, a 50-pound system designed for the sodium bicarbonate will hold slightly more by weight than all-purpose dry chemical (ammonium phosphate) by weight. The word “nominal” is used in § 75.1107-9 to express the approximate weight in pounds of all-purpose dry chemical.

(b) On unattended underground equipment, the number of pounds of dry chemical employed by the system shall be not less than 1 pound per square foot of top surface area of the equipment; however, the minimum amount in any system shall be 20 pounds (nominal). The discharge shall be directed into and on potentially hazardous locations of the equipment.

(c) On attended underground equipment, the number of pounds (nominal) employed by the system shall equal 5 times the total number of hazardous locations; however, the minimum amount in any system shall not be less than the following, except that systems on haulage vehicles installed prior to the effective date of this section may contain 20 pounds (nominal).

Type of equipment | Dry chemical pounds (nominal)

(1) Cutting machines | 40

(2) Continuous miners | 40

(3) Haulage vehicles | 30

(4) All other attended equipment | 20

(d) The amount of dry chemical discharged into the cable reel compartments of attended underground equipment shall be approximately 25 percent of the total amount required to be discharged by the system; however, the quantity discharged into cable reel compartments need not exceed 10 pounds.

[37 FR 15302, July 29, 1972]

§ 75.1107-10 High expansion foam devices; minimum capacity.

(a) On unattended underground equipment the amount of water delivered as high expansion foam for a period of approximately 20 minutes shall be not less than 0.06 gallon per minute per square foot of surface area of the equipment protected; however, the minimum total rate for any system shall be not less than 3 gallons per minute.

(b) On attended underground equipment, foam may be delivered by internal injection, inundation, or combination-type systems. Each system shall deliver water as foam for a minimum of 10 minutes. For internal injection, the rate of water application as high expansion foam shall be not less than 0.5 gallon per minute per hazardous location; however, the minimum total rate shall be not less than 2 gallons per minute. For inundation, the rate of water application as high expansion foam shall be not less than 0.05 gallon per minute per square foot of top surface area of the equipment protected; however, the minimum total rate shall be not less than 5 gallons of water per minute.

(c) In combined internal injection and inundation systems the rate of water applied as foam shall not be less than 0.035 gallon per minute per square foot of top surface area of the equipment protected; however, the minimum total rate shall not be less than 3.5 gallons of water per minute.

(d) Where internal injection is employed, the amount of water discharged as high expansion foam into the cable reel compartments of underground equipment regularly operated by a miner shall be approximately 25 percent of the total amount required to be discharged by the system; however, the quantity of water discharged as foam into the cable reel compartment need not exceed 1.5 gallons.

[37 FR 15303, July 29, 1972]

§ 75.1107-11 Extinguishing agents; requirements on mining equipment employed in low coal.

On mining equipment no more than 32 inches high, the quantity of extinguishing agent required under the provisions of §§ 75.1107-7, 75.1107-9, and 75.1107-10 may be reduced by one-fourth if space limitations on the equipment require such reduction.

[37 FR 15303, July 29, 1972]

§ 75.1107-12 Inerting of mine atmosphere prohibited.

No fire suppression device designed to control fire by total flooding shall be installed to protect unattended underground equipment except in enclosed dead-end entries or enclosed rooms.

[37 FR 15303, July 29, 1972]

§ 75.1107-13 Approval of other fire suppression devices.

Notwithstanding the provisions of §§ 75.1107-1 through 75.1107-12 the District Manager for the District in which the mine is located may approve any other fire suppression system or device which provides substantially equivalent protection as would be achieved through compliance with those sections: Provided, That no such system or device shall be approved which does not meet the following minimum criteria:

(a) Components shall be approved by the Secretary, or where appropriate be listed as approved by a nationally recognized agency approved by the Secretary.

(b) The fire suppression equipment shall be designed to withstand the rigors of the mine environment. Where used, pressure vessels shall conform with the requirements of section 3603, 3606, 3607, 3707, and 3708 of National Fire Code No. 22 “Water Tanks for Private Fire Protection” (NFPA No. 22-1971).

(c) The cover of hose of fire suppression devices, if used on the protected equipment, shall meet the flame-resistant requirements of Part 18 of this chapter (Bureau of Mines Schedule 2G).

(d) Extinguishing agents shall not create a serious toxic or other hazard to the miners.

(e) The electrical components of the fire suppression device shall meet the requirements for electrical components of the mining machine.

(f) Where used, manual actuators for initiating the operation of the fire suppression device shall be readily accessible to the machine operator. On unattended equipment, an automatic as well as a manual actuator shall be provided.

(g) On unattended equipment the fire suppression device shall operate independently of the power to the main motor (or equivalent) so it will remain operative if the circuit breakers (or other protective device) actuates. On attended equipment powered through a trailing cable the fire suppression device shall operate independently of the electrical power provided by the cable.

(h) On unattended equipment, the sensor system shall have a means for checking its operative condition.

(i) The fire suppression agent shall be directed at locations where the greatest potential fire hazard exists. Cable reel compartments shall receive approximately twice the quantity of extinguishing agent as each other hazardous location.

(j) The rate of application of the fire suppression agent shall minimize the time for quenching and the total quantity applied shall be sufficient to quench a fire in its incipient stage.

(k) The effectiveness of the quenching agent, together with the total quantity of agent and its rate of application shall provide equivalent protection to the water, dry powder, or foam systems described in §§ 75.1107-7, 75.1107-9, and 75.1107-10.

(l) The fire suppression device shall be operable at all times electrical power is connected to the mining machine, except during tramming when the machine is in a ventilated passageway, the water hose if used, may be switched from one hydrant to another in a reasonable time and except in systems meeting the minimum special criteria set forth in paragraph (m) of this section.

(m) Systems for attended equipment which are not continuously connected to a water supply shall not be approved unless they meet the following minimum criteria:

(1) The machine shall be equipped with a firehose at least 50 feet in length which is continuously connected to the machine-mounted portion of the system.

(2) Hydrants in proximity to the area where the machine is to be used shall be equipped with sufficient hose to reach the machine at any time it is connected to a power source.

(3) The machine shall be used only where the operator (or other person) will always be in ventilated air uncontaminated by smoke and hot gases from the machine fire while extending the machine-mounted hose to connect with the hydrant-mounted hose.

(4) The machine and hydrant hoses shall be readily accessible so that the connection between the machine-mounted hose and the hydrant hose can be made and water flow achieved in not more than 3 minutes under actual mining conditions for any location of the machine while electric power is connected.

(5) The rate of water flow at the machine shall provide a minimum of 0.12 gallon of water per minute per square foot of top surface area (excluding conveyors, cutters, and gathering heads). The water shall discharge to all hazardous locations on the machine.

(6) Hose, if used on the machine, in addition to meeting the flame resistant requirements for the cover of a hose provided in §§ 75.1107-3(b) and 75.1107-13(c) shall have a minimum burst pressure 4 times that of the static water pressure at the mining machine. Fabric braid hose shall have at least two braids, and wire braid hose shall have at least a single braid.

(7) In addition to the hose located at the hydrant (which is intended to be connected to the hose on the machine) the firefighting equipment required by § 75.1100-2(a) shall be maintained.

(8) A sufficient number of trained miners shall be kept on the section when the machine is in use to connect the machine hose to the hydrant hose and achieve water flow in not more than 3 minutes.

[37 FR 15303, July 29, 1972]

§ 75.1107-14 Guards and handrails; requirements where fire suppression devices are employed.

All unattended underground equipment provided with fire suppression devices which are mounted in dead end entries, enclosed rooms or other potentially hazardous locations shall be equipped with adequate guards at moving or rotating components. Handrails or other effective protective devices shall be installed at such locations where necessary to facilitate rapid egress from the area surrounding such equipment.

[37 FR 15303, July 29, 1972]

§ 75.1107-15 Fire suppression devices; hazards; training of miners.

Each operator shall instruct all miners normally assigned to the active workings of the mine with respect to any hazards inherent in the operation of all fire suppression devices installed in accordance with § 75.1107-1 and, where appropriate, the safeguards available at each such installation.

[37 FR 15303, July 29, 1972]

§ 75.1107-16 Inspection of fire suppression devices.

(a) All fire suppression devices shall be visually inspected at least once each week by a person qualified to make such inspections.

(b) Each fire suppression device shall be tested and maintained in accordance with the requirements specified in the appropriate National Fire Code listed as follows for the type and kind of device used:

National Fire Code No. 11A “High Expansion Foam Systems” (NFPA No. 11A—1970). National Fire Code No. 13A “Care and Maintenance of Sprinkler Systems” (NFPA No. 13A—1971). National Fire Code No. 15 “Water Spray Fixed Systems for Fire Protection” (NFPA No. 15—1969). National Fire Code No. 17 “Dry Chemical Extinguishing Systems” (NFPA No. 17—1969). National Fire Code No. 72A “Local Protective Signaling Systems” (NFPA No. 72A—1967). National Fire Code No. 198 “Care of Fire Hose” (NFPA No. 198—1969).

(c) A record of the inspections required by this section shall be maintained by the operator. The record of the weekly inspections may be maintained at an appropriate location by each fire suppression device.

[37 FR 15304, July 29, 1972, as amended at 60 FR 33723, June 29, 1995]

§ 75.1107-17 Incorporation by reference; availability of publications.

In accordance with 5 U.S.C. 552(a), the technical publications to which reference is made in §§ 75.1107-1 through 75.1107-16, and which have been prepared by organizations other than the Bureau of Mines or the Mine Safety and Health Administration, are hereby incorporated by reference and made a part hereof. The incorporated publications are available for examination at each MSHA Coal Mine Safety and Health district office. National Fire Codes are available from the National Fire Protection Association, 11 Tracy Drive, Avon, MA 02322; Telephone: 800-344-3555 (toll free); http://www.nfpa.org.

[37 FR 15304, July 29, 1972, as amended at 71 FR 16669, Apr. 3, 2006]

§ 75.1108 Approved conveyor belts.

(a)-(b) [Reserved]

(c) All conveyor belts used in underground coal mines shall be approved under part 14 of this title.

[73 FR 80616, Dec. 31, 2008, as amended at 91 FR 38289, June 25, 2026]

Subpart M Maps
§ 75.1200 Mine map.

[Statutory Provisions]

The operator of a coal mine shall have in a fireproof repository located in an area on the surface of the mine chosen by the mine operator to minimize the danger of destruction by fire or other hazard, an accurate and up-to-date map of such mine drawn on scale. Such map shall show:

(a) The active workings;

(b) All pillared, worked out, and abandoned areas, except as provided in this section;

(c) Entries and aircourses with the direction of airflow indicated by arrows;

(d) Contour lines of all elevations;

(e) Elevations of all main and cross or side entries;

(f) Dip of the coalbed;

(g) Escapeways;

(h) Adjacent mine workings within 1,000 feet;

(i) Mines above or below;

(j) Water pools above; and

(k) Either producing or abandoned oil and gas wells located within 500 feet of such mine and any underground area of such mine; and,

(l) Such other information as the Secretary may require. Such map shall identify those areas of the mine which have been pillared, worked out, or abandoned, which are inaccessible or cannot be entered safely and on which no information is available.

§ 75.1200-1 Additional information on mine map.

Additional information required to be shown on mine maps under § 75.1200 shall include the following:

(a) Name and address of the mine;

(b) The scale and orientation of the map;

(c) The property or boundary lines of the mine;

(d) All drill holes that penetrate the coalbed being mined;

(e) All shaft, slope, drift, and tunnel openings and auger and strip mined areas of the coalbed being mined;

(f) The location of all surface mine ventilation fans; the location may be designated on the mine map by symbols;

(g) The location of railroad tracks and public highways leading to the mine, and mine buildings of a permanent nature with identifying names shown;

(h) The location and description of at least two permanent base line points coordinated with the underground and surface mine traverses, and the location and description of at least two permanent elevation bench marks used in connection with establishing or referencing mine elevation surveys;

(i) The location of any body of water dammed in the mine or held back in any portion of the mine; provided, however, such bodies of water may be shown on overlays or tracings attached to the mine maps used to show contour lines as provided under paragraph (m) of this section;

(j) The elevations of tops and bottoms of shafts and slopes, and the floor at the entrance to drift and tunnel openings;

(k) The elevation of the floor at intervals of not more than 200 feet in:

(1) At least one entry of each working section, and main and cross entries;

(2) The last line of open crosscuts of each working section, and main and cross entries before such sections and main and cross entries are abandoned;

(3) Rooms advancing toward or adjacent to property or boundary lines or adjacent mines;

(l) The elevation of any body of water dammed in the mine or held back in any portion of the mine; and,

(m) Contour lines passing through whole number elevations of the coalbed being mined. The spacing of such lines shall not exceed 10-foot elevation levels, except that a broader spacing of contour lines may be approved by the District Manager for steeply-pitching coalbeds. Contour lines may be placed on overlays or tracings attached to mine maps.

(n) The locations of refuge alternatives.

[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 80697, Dec. 31, 2008]

§ 75.1200-2 Accuracy and scale of mine maps.

(a) The scale of mine maps submitted to the Secretary shall not be less than 100 or more than 500 feet to the inch.

(b) Mine traverses shall be advanced by closed loop methods of traversing or other equally accurate methods of traversing.

§ 75.1201 Certification.

[Statutory Provisions]

Such map shall be made or certified by a registered engineer or a registered surveyor of the State in which the mine is located.

§ 75.1202 Temporary notations, revisions, and supplements.

[Statutory Provisions]

Such map shall be kept up-to-date by temporary notations and such map shall be revised and supplemented at intervals prescribed by the Secretary on the basis of a survey made or certified by such engineer or surveyor.

§ 75.1202-1 Temporary notations, revisions, and supplements.

(a) Mine maps shall be revised and supplemented at intervals of not more than 6 months.

(b) Temporary notations shall include:

(1) The location of each working face of each working place;

(2) Pillars mined or other such second mining;

(3) Permanent ventilation controls constructed or removed, such as seals, overcasts, undercasts, regulators, and permanent stoppings, and the direction of air currents indicated;

(4) Escapeways and refuge alternatives designated by means of symbols.

[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 80697, Dec. 31, 2008]

§ 75.1203 Availability of mine map.

[Statutory Provisions]

The coal mine map and any revision and supplement thereof shall be available for inspection by the Secretary or his authorized representative, by coal mine inspectors of the State in which the mine is located, by miners in the mine and their representatives and by operators of adjacent coal mines and by persons owning, leasing, or residing on surface areas of such mines or areas adjacent to such mines. The operator shall furnish to the Secretary or his authorized representative and to the Secretary of Housing and Urban Development, upon request, one or more copies of such maps and any revision and supplement thereof. Such map or revision and supplement thereof shall be kept confidential and its contents shall not be divulged to any other person, except to the extent necessary to carry out the provisions of this Act and in connection with the functions and responsibilities of the Secretary of Housing and Urban Development.

§ 75.1204 Mine closure; filing of map with Secretary.

[Statutory Provisions]

Whenever an operator permanently closes or abandons a coal mine, or temporarily closes a coal mine for a period of more than 90 days, he shall promptly notify the Secretary of such closure. Within 60 days of the permanent closure or abandonment of the mine, or, when the mine is temporarily closed, upon the expiration of a period of 90 days from the date of closure, the operator shall file with the Secretary a copy of the mine map revised and supplemented to the date of the closure. Such copy of the mine map shall be certified by a registered surveyor or registered engineer of the State in which the mine is located and shall be available for public inspection.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1204-1 Places to give notice and file maps.

Operators shall give notice of mine closures and file copies of maps with the Coal Mine Safety and Health District Office for the district in which the mine is located.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995; 71 FR 16669, Apr. 3, 2006]

Subpart N Explosives and Blasting

Source: 53 FR 46786, Nov. 18, 1988, unless otherwise noted.

§ 75.1300 Definitions.

The following definitions apply in this subpart.

Approval. A document issued by MSHA which states that an explosive or explosive unit has met the requirements of this part and which authorizes an approval marking identifying the explosive or explosive unit as approved as permissible.

Battery starting. The use of unconfined explosives to start the flow of coal down a breast or chute in an anthracite mine.

Blasting off the solid. Blasting the working face without providing a second free face by cutting, shearing or other method before blasting.

Instantaneous detonator. An electric detonator that fires within 6 milliseconds after application of the firing current.

Laminated partition. A partition composed of the following material and minimum nominal dimensions: 1/2-inch thick plywood, 1/2-inch thick gypsum wall board, 1/8-inch thick low carbon steel and 1/4-inch thick plywood, bonded together in that order.

Opener hole. The first hole or holes fired in a round blasted off the solid to create an additional free face.

Permissible blasting unit. A device that has been approved by MSHA and that is used for firing electric detonators.

Permissible explosive. Any substance, compound or mixture which is approved by MSHA and whose primary purpose is to function by explosion.

Round. A group of boreholes fired or intended to be fired in a continuous sequence with one application of the firing current.

Sheathed explosive unit. A device consisting of an approved or permissible explosive covered by a sheath encased in a sealed covering and designed to be fired outside the confines of a borehole.

Short-delay electric detonator. An electric detonator with a designated delay period of 25 to 1,000 milliseconds.

§ 75.1301 Qualified person.

(a) A qualified person under this subpart is a person who—

(1) Is certified or qualified to use explosives by the State in which the mine is located provided that the State requires a demonstration of ability to safely use permissible explosives as prescribed by this subpart effective January 17, 1989; or

(2) In States that do not certify or qualify persons to use explosives required by this section, has at least 1 year of experience working in an underground coal mine that includes direct involvement with procedures for handling, loading, and preparing explosives for blasting and demonstrates to an authorized representative of the Secretary the ability to use permissible explosives safely.

(b) Persons qualified or certified by a State to use permissible explosives in underground coal mines as of May 17, 1989, are considered qualified under this section even though their State program did not contain a demonstration of ability requirement.

[35 FR 17890, Nov. 20, 1970, as amended at 56 FR 51616, Oct. 11, 1991; 60 FR 33723, June 29, 1995]

§ 75.1310 Explosives and blasting equipment.

(a) Only permissible explosives, approved sheathed explosive units, and permissible blasting units shall be taken or used underground.

(b) Black blasting powder, aluminum-cased detonators, aluminum-alloy-cased detonators, detonators with aluminum leg wires, and safety fuses shall not be taken or used underground.

(c) Explosives shall be fired only with a permissible blasting unit used in a manner consistent with its approval. Blasting units approved by MSHA that have approval labels specifying use with short-delay detonators with delay periods between 25-500 milliseconds are accepted to fire short-delay detonators up to 1,000 milliseconds, instantaneous detonators and long period delay detonators for anthracite mines.

(d) Permissible explosives and sheathed explosive units shall not be used underground when they are below the minimum product firing temperature specified by the approval. Explosives previously approved which do not specify a minimum firing temperature are permissible for use so long as the present approval is maintained.

(e) Electric detonators shall be compatible with the blasting unit and have sufficient strength to initiate the explosives being used.

§ 75.1311 Transporting explosives and detonators.

(a) When explosives and detonators are to be transported underground—

(1) They shall be enclosed in separate, substantially constructed containers made of nonconductive material, with no metal or other conductive materials exposed inside, except as specified in paragraph (d) of this section; and

(2) Each container of explosives and of detonators shall be indelibly marked with a readily visible warning identifying the contents.

(b) When explosives and detonators are transported by any cars or vehicles—

(1) The cars or vehicles shall be marked with warnings to identify the contents as explosive. The warnings shall be readily visible to miners approaching from any direction and in indelible letters;

(2) Explosives and detonators shall be transported either in separate cars or vehicles, or if in the same cars or vehicles as follows:

(i) Class A and Class C detonators in quantities greater than 1,000 shall be kept in the original containers as shipped from the manufacturer and separated from explosives by a hardwood partition at least 4 inches thick, a laminated partition or equivalent; and

(ii) Class A and Class C detonators in quantities of no more than 1,000 shall be separated from explosives by a hardwood partition at least 4 inches thick, a laminated partition or equivalent.

(3) No persons, other than those necessary to operate the equipment or to accompany the explosives and detonators, shall be transported with explosives and detonators, and

(4) When explosives and detonators are transported using trolley locomotives—

(i) Trips carrying explosives and detonators shall be separated from all other mantrips by at least a 5-minute interval; and

(ii) Cars containing explosives or detonators shall be separated from the locomotives by at least one car that is empty or that contains noncombustible materials.

(c) When explosives and detonators are transported on conveyor belts—

(1) Containers of explosives shall be separated from containers of detonators by at least 50 feet;

(2) At least 6 inches of clearance shall be maintained between the top of any container of explosives or container of detonators and the mine roof or other obstruction;

(3) Except when persons are riding the belt to accompany explosives or detonators, a person shall be at each transfer point between belts and at the unloading location; and

(4) Conveyor belts shall be stopped before explosives or detonators are loaded or unloaded.

(d) When explosives and detonators are transported by hand they shall be carried in separate, nonconductive, closed containers.

§ 75.1312 Explosives and detonators in underground magazines.

(a) The quantity of explosives kept underground shall not be more than is needed for 48 hours of use.

(b) Except as provided in § 75.1313, explosives and detonators taken underground shall be kept in—

(1) Separate, closed magazines at least 5 feet apart; or

(2) The same closed magazine when—

(i) Separated by a hardwood partition at least 4 inches thick; or

(ii) Separated by a laminated partition; or

(iii) Separated by a device that is equivalent.

(c) Only explosives and detonators shall be kept in underground magazines.

(d) Magazines shall be substantially constructed and all interior surfaces shall be made of nonconductive material, with no metal or other conductive material exposed inside.

(e) All magazines shall be—

(1) Located at least 25 feet from roadways and any source of electric current;

(2) Located out of the direct line of the forces from blasting; and

(3) Kept as dry as practicable.

(f) Magazine locations shall be posted with indelibly marked and readily visible warnings indicating the presence of explosives.

(g) Only materials and equipment to be used in blasting shall be stored at magazine locations.

§ 75.1313 Explosives and detonators outside of magazines.

(a) The quantity of explosives outside a magazine for use in a working section or other area where blasting is to be performed shall—

(1) Not exceed 100 pounds; or

(2) Not exceed the amount necessary to blast one round when more than 100 pounds of explosives is required.

(b) Explosives and detonators outside a magazine that are not being transported or prepared for loading boreholes shall be kept in closed separate containers made of nonconductive material with no metal or other conductive material exposed inside and the containers shall be—

(1) At least 15 feet from any source of electric current;

(2) Out of the direct line of the forces from blasting;

(3) In a location to prevent damage by mobile equipment; and

(4) Kept as dry as practicable.

(c) Explosives and detonators not used during the shift shall be returned to a magazine by the end of the shift.

§ 75.1314 Sheathed explosive units.

(a) A separate instantaneous detonator shall be used to fire each sheathed explosive unit.

(b) Sheathed explosive units shall be primed and placed in position for firing only by a qualified person or a person working in the presence of and under the direction of a qualified person. To prime a sheathed explosive unit, the entire detonator shall be inserted into the detonator well of the unit and be held securely in place.

(c) Sheathed explosive units shall not be primed until immediately before the units are placed where they are to be fired. A sheathed explosive unit shall not be primed if it is damaged or deteriorated.

(d) Except in anthracite mines, rock dust shall be applied to the roof, ribs and floor within a 40-foot radius of the location where the sheathed explosive units are to be fired.

(e) No more than three sheathed explosive units shall be fired at one time.

(f) No sheathed explosive unit shall be fired in contact with another sheathed explosive unit.

§ 75.1315 Boreholes for explosives.

(a) All explosives fired underground shall be confined in boreholes except—

(1) Sheathed explosives units and other explosive units approved by MSHA for firing outside the confines of a borehole; and

(2) Shots fired in anthracite mines for battery starting or for blasting coal overhangs. No person shall go inside a battery to start the flow of material.

(b) Each borehole in coal for explosives shall be at least 24 inches from any other borehole and from any free face, unless prohibited by the thickness of the coal seam.

(c) Each borehole in rock for explosives shall be at least 18 inches from any other borehole in rock, at least 24 inches from any other borehole in coal, and at least 18 inches from any free face.

(d) No borehole that has contained explosives shall be used for starting any other hole.

(e) When blasting slab rounds off the solid, opener holes shall not be drilled beyond the rib line.

(f) When coal is cut for blasting, the coal shall be supported if necessary to maintain the stability of the column of explosives in each borehole.

§ 75.1316 Preparation before blasting.

(a)(1) All nonbattery-powered electric equipment, including cables, located within 50 feet from boreholes to be loaded with explosives or the sites where sheathed explosive units are to be placed and fired shall be deenergized or removed to at least 50 feet from these locations before priming of explosives. Battery-powered equipment shall be removed to at least 50 feet from these locations before priming of explosives.

(2) As an alternative to paragraph (a)(1) of this section, electric equipment, including cables, need not be deenergized or removed if located at least 25 feet from these locations provided stray current tests conducted prior to priming the explosives detect stray currents of 0.05 ampere or less through a 1-ohm resistor.

(i) Tests shall be made at floor locations on the perimeter, on energized equipment frames and on repaired areas of energized cables within the area between 25 to 50 feet from the locations where the explosives are to be primed.

(ii) Tests shall be conducted using a blasting multimeter or other instrument specifically designed for such use.

(3) The blasting cable or detonator circuitry shall not come in contact with energized electric equipment, including cables.

(b) Before loading boreholes with explosives, each borehole shall be cleared and its depth and direction determined.

(c) No borehole drilled beyond the depth of cut coal shall be loaded with explosives unless that portion of the borehole deeper than the cut is tamped with noncombustible material.

(d) When two working faces are approaching each other, cutting, drilling and blasting shall be done at only one working face at a time if the two faces are within 25 feet of each other.

[35 FR 17890, Nov. 20, 1970, as amended at 56 FR 51616, Oct. 11, 1991]

§ 75.1317 Primer cartridges.

(a) Primer cartridges shall be primed and loaded only by a qualified person or a person working in the presence of and under the direction of a qualified person.

(b) Primer cartridges shall not be primed until immediately before loading boreholes.

(c) Only a nonsparking punch shall be used when priming explosive cartridges.

(d) Detonators shall be completely within and parallel to the length of the cartridge and shall be secured by half-hitching the leg wires around the cartridge or secured by an equally effective method.

§ 75.1318 Loading boreholes.

(a) Explosives shall be loaded by a qualified person or a person working in the presence of and under the direction of a qualified person.

(b) When boreholes are being loaded, no other work except that necessary to protect persons shall be done in the working place or other area where blasting is to be performed.

(c) When loading boreholes drilled at an angle of 45 degrees or greater from the horizontal in solid rock or loading long holes drilled upward in anthracite mines—

(1) The first cartridge in each borehole shall be the primer cartridge with the end of the cartridge containing the detonator facing the back of the borehole; and

(2) The explosive cartridges shall be loaded in a manner that provides contact between each cartridge in the borehole.

(d) When loading other boreholes—

(1) The primer cartridge shall be the first cartridge loaded in the borehole;

(2) The end of the cartridge in which the detonator is inserted shall face the back of the borehole; and

(3) The primer cartridge and other explosives shall be pushed to the back of the borehole in a continuous column with no cartridge being deliberately crushed or deformed.

(e) An explosive shall not be loaded into a borehole if it is damaged, deteriorated or if the cartridge is incompletely filled.

(f) Explosives of different brands, types or cartridge diameters shall not be loaded in the same borehole.

(g) Only nonconductive, nonsparking tamping poles shall be used for loading and tamping boreholes. The use of nonsparking connecting devices for extendable tamping poles is permitted.

[53 FR 46786, Nov. 18, 1988; 54 FR 888, Jan. 10, 1989]

§ 75.1319 Weight of explosives permitted in boreholes in bituminous and lignite mines.

(a) The total weight of explosives loaded in any borehole in bituminous and lignite mines shall not exceed 3 pounds except when blasting solid rock in its natural deposit.

(b) The total weight of explosives loaded in a borehole less than 6 feet deep in bituminous and lignite mines shall be reduced by 1/2 pound for each foot of borehole less than 6 feet.

§ 75.1320 Multiple-shot blasting.

(a) No more than 20 boreholes shall be fired in a round unless permitted in writing by the District Manager under § 75.1321.

(b) Instantaneous detonators shall not be used in the same circuit with delay detonators in any underground coal mine.

(c) In bituminous and lignite mines, only detonators with delay periods of 1,000 milliseconds or less shall be used.

(d) When blasting in anthracite mines, each borehole in a round shall be initiated in sequence from the opener hole or holes.

(e) Arrangement of detonator delay periods for bituminous and lignite mines shall be as follows:

(1) When blasting cut coal—

(i) The first shot or shots fired in a round shall be initiated in the row nearest the kerf or the row or rows nearest the shear; and

(ii) After the first shot or shots, the interval between the designated delay periods of successive shots shall be at least 50 milliseconds but not more than 100 milliseconds.

(2) When blasting coal off the solid—

(i) Each shot in the round shall be initiated in sequence from the opener hole or holes; and

(ii) After the first shot or shots, the interval between the designated delay periods of successive shots shall be at least 50 milliseconds but not more than 100 milliseconds.

§ 75.1321 Permits for firing more than 20 boreholes and for use of nonpermissible blasting units.

(a) Applications for permits for firing more than 20 boreholes in a round and for the use of nonpermissible blasting units shall be submitted in writing to the District Manager for the district in which the mine is located and shall contain the following information:

(1) The name and address of the mine;

(2) The active workings in the mine affected by the permit and the approximate number of boreholes to be fired;

(3) The period of time during which the permit will apply;

(4) The nature of the development or construction for which they will be used, e.g., overcasts, undercasts, track grading, roof brushing or boom holes;

(5) A plan, proposed by the operator designed to protect miners in the mine from the hazards of methane and other explosive gases during each multiple shot, e.g., changes in the mine ventilation system, provisions for auxiliary ventilation and any other safeguards necessary to minimize such hazards;

(6) A statement of the specific hazards anticipated by the operator in blasting for overcasts, undercasts, track grading, brushing of roof, boom holes or other unusual blasting situations such as coalbeds of abnormal thickness; and

(7) The method to be employed to avoid the dangers anticipated during development or construction which will ensure the protection of life and the prevention of injuries to the miners exposed to such underground blasting.

(b) The District Manager may permit the firing of more than 20 boreholes of permissible explosives in a round where he has determined that it is necessary to reduce the overall hazard to which miners are exposed during underground blasting. He may also permit the use of nonpermissible blasting units if he finds that a permissible blasting unit does not have adequate blasting capacity and that the use of such permissible units will create any of the following development or construction hazards:

(1) Exposure to disturbed roof in an adjacent cavity while scaling and supporting the remaining roof prior to wiring a new series of boreholes;

(2) Exposure to underburden boreholes where prior rounds have removed the burden adjacent to a remaining borehole;

(3) Exposure to an unsupported roof while redrilling large fragmented roof rock following the loss of predrilled boreholes during earlier blasting operations; or

(4) Any other hazard created by the use of permissible blasting units during underground development or construction.

(c) Permits shall be issued on a mine-by-mine basis for periods of time to be specified by the District Manager.

(d) Permits issued under this section shall specify and include as a condition of their use, any safeguards, in addition to those proposed by the operator, which the District Manager issuing such permit has determined will be required to ensure the welfare of the miners employed in the mine at the time of the blasting permitted.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1322 Stemming boreholes.

(a) Only noncombustible material shall be used for stemming boreholes.

(b) Stemming materials other than water stemming bags shall be tamped to fill the entire cross sectional area of the borehole.

(c) Stemming material shall contact the explosive cartridge nearest the collar of the borehole.

(d) Each borehole 4 or more feet deep shall be stemmed for at least 24 inches.

(e) Each borehole less than 4 feet deep shall be stemmed for at least half the depth of the borehole.

(f) When blasting off the solid in bituminous and lignite mines, only pliable clay dummies shall be used for stemming.

(g) The diameter of a water stemming bag shall be within 1/4 of an inch of the diameter of the drill bit used to drill the borehole.

(h) Water stemming bags shall be constructed of tear-resistant and flame-resistant material and be capable of withstanding a 3-foot drop when filled without rupturing or developing leaks.

§ 75.1323 Blasting circuits.

(a) Blasting circuits shall be protected from sources of stray electric current.

(b) Detonators made by different manufacturers shall not be combined in the same blasting circuit.

(c) Detonator leg wires shall be shunted until connected into the blasting circuit.

(d) Blasting cables shall be—

(1) Well insulated, copper wire of a diameter not smaller than 18-gauge; and

(2) Long enough to permit the round to be fired from a safe location that is around at least one corner from the blasting area.

(e) Blasting cables shall be shunted until immediately before firing, except when testing for circuit continuity.

(f) Wire used between the blasting cable and detonator circuitry shall—

(1) Be undamaged;

(2) Be well insulated;

(3) Have a resistance no greater than 20-gauge copper wire; and

(4) Be not more than 30 feet long.

(g) Each wire connection in a blasting circuit shall be—

(1) Properly spliced; and

(2) Separated from other connections in the circuit to prevent accidental contact and arcing.

(h) Uninsulated connections in each blasting circuit shall be kept out of water and shall not contact the coal, roof, ribs, or floor.

(i) When 20 or fewer boreholes are fired in a round, the blasting circuit shall be wired in a single series.

(j) Immediately prior to firing, all blasting circuits shall be tested for continuity and resistance using a blasting galvanometer or other instrument specifically designed for testing blasting circuits.

[53 FR 46786, Nov. 18, 1988; 54 FR 27641, June 30, 1989]

§ 75.1324 Methane concentration and tests.

(a) No shot shall be fired in an area that contains 1.0 volume percent or more of methane.

(b) Immediately before shots are fired, the methane concentration in a working place or any other area where blasting is to be performed, shall be determined by a person qualified to test for methane.

§ 75.1325 Firing procedures.

(a) Shots shall be fired by a qualified person or a person working in the presence of and under the direction of a qualified person.

(b) Only one face in a working place shall be blasted at a time, except that when blasting cut coal up to three faces may be blasted in a round if each face has a separate kerf and no more than a total of 20 shots connected in a single series are fired in the round. A permit to fire more than 20 boreholes in a round under the provisions of 30 CFR 75.1320 and 75.1321 may not be obtained for use when blasting multiple faces.

(c) Before blasting—

(1) All persons shall leave the blasting area and each immediately adjacent working place where a hazard would be created by the blast, to an area that is around at least one corner from the blasting area;

(2) The qualified person shall ascertain that all persons are a safe distance from the blasting area; and

(3) A warning shall be given and adequate time allowed for persons to respond.

(d) All shots shall be fired promptly, after all persons have been removed to a safe location.

[35 FR 17890, Nov. 20, 1970, as amended at 56 FR 51616, Oct. 11, 1991]

§ 75.1326 Examination after blasting.

(a) After blasting, the blasting area shall not be entered until it is clear of smoke and dust.

(b) Immediately after the blasting area has cleared, a qualified person or a person working in the presence of and under the direction of a qualified person, shall examine the area for misfires, methane and other hazardous conditions.

(c) If a round has partially detonated, the qualified person shall immediately leave the area and no person shall reenter the affected area for at least 5 minutes.

§ 75.1327 Misfires.

(a) When misfires occur, only work by a qualified person to dispose of misfires and other work necessary to protect persons shall be done in the affected area.

(b) When a misfire cannot be disposed of—

(1) A qualified person shall post each accessible entrance to the area affected by the hazard of the misfire with a warning at a conspicuous location to prohibit entry; and

(2) The misfire shall be immediately reported to mine management.

[53 FR 46786, Nov. 18, 1988; 54 FR 27641, June 30, 1989]

§ 75.1328 Damaged or deteriorated explosives and detonators.

(a) Damaged explosives or detonators shall be—

(1) Placed in separate containers constructed of nonconductive and nonsparking materials; and

(2) Removed from the mine or placed in a magazine and removed when the magazine is resupplied.

(b) Damaged detonators shall be shunted, if practicable, either before being removed from the mine or placed in a magazine.

(c) Deteriorated explosives and detonators shall be handled and disposed of in accordance with the instructions of the manufacturer.

Subpart O Hoisting and Mantrips
§ 75.1400 Hoisting equipment; general.

(a) Every hoist used to transport persons shall be equipped with overspeed, overwind, and automatic stop controls.

(b) Every hoist handling a platform, cage, or other device used to transport persons shall be equipped with brakes capable of stopping the fully loaded platform, cage, or other device.

(c) Cages, platforms, or other devices used to transport persons in shafts and slopes shall be equipped with safety catches or other no less effective devices approved by the Secretary that act quickly and effectively in an emergency. Such catches or devices shall be tested at least once every two months.

(d) Hoisting equipment, including automatic elevators, used to transport persons shall be examined daily.

(e) Where persons are transported into or out of a mine by a hoist, a qualified hoisting engineer shall be on duty while any person is underground. No such engineer, however, shall be required for automatically operated cages, platforms, or elevators.

[48 FR 53239, Nov. 25, 1983]

§ 75.1400-1 Hoists; brakes, capability.

Brakes on hoists used to transport persons shall be capable of stopping and holding the fully loaded platform, cage, or other device at any point in the shaft, slope, or incline.

§ 75.1400-2 Hoists; tests of safety catches; records.

A record shall be made in a book of the tests, required by § 75.1400, of the safety catches or other devices approved by the Secretary. Each entry shall be signed by the person making the tests and countersigned by a responsible official.

§ 75.1400-3 Daily examination of hoisting equipment.

Hoists and elevators shall be examined daily and such examinations shall include, but not be limited to, the following:

(a) Elevators. A visual examination of the rope for wear, broken wires, and corrosion, especially at excessive strain points such as near the attachments and where the rope rests on sheaves;

(b) Hoists and elevators. (1) An examination of the rope fastenings for defects;

(2) An examination of safety catches;

(3) An examination of the cages, platforms, elevators, or other devices for loose, missing or defective parts;

(4) An examination of the head sheaves to check for broken flanges, defective bearings, rope alignment, and proper lubrication; and

(5) An observation of the lining and all other equipment and appurtenances installed in the shaft.

[48 FR 53239, Nov. 25, 1983]

§ 75.1400-4 Certifications and records of daily examinations.

At the completion of each daily examination required by § 75.1400, the person making the examination shall certify, by signature and date, that the examination has been made. If any unsafe condition is found during the examinations required by § 75.1400-3, the person conducting the examination shall make a record of the condition and the date. Certifications and records shall be retained for one year.

[48 FR 53239, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995]

§ 75.1401 Hoists; rated capacities; indicators.

Hoists shall have rated capacities consistent with the loads handled. An accurate and reliable indicator of the position of the cage, platform, skip, bucket, or cars shall be provided.

[48 FR 53239, Nov. 25, 1983]

§ 75.1401-1 Hoists; indicators.

The indicator required by § 75.1401 of this subpart shall be placed so that it is in clear view of the hoisting engineer and shall be checked daily to determine its accuracy.

[48 FR 53239, Nov. 25, 1983]

§ 75.1402 Communication between shaft stations and hoist room.

[Statutory Provisions]

There shall be at least two effective methods approved by the Secretary of signaling between each of the shaft stations and the hoist room, one of which shall be a telephone or speaking tube.

§ 75.1402-1 Communication between shaft stations and hoist room.

One of the methods used to communicate between shaft stations and the hoist room shall give signals which can be heard by the hoisting engineer at all times while men are underground.

§ 75.1402-2 Tests of signaling systems.

Signaling systems used for communication between shaft stations and the hoist room shall be tested daily.

§ 75.1403 Other safeguards.

[Statutory Provisions]

Other safeguards adequate, in the judgment of an authorized representative of the Secretary, to minimize hazards with respect to transportation of men and materials shall be provided.

§ 75.1403-1 General criteria.

(a) Sections 75.1403-2 through 75.1403-11 set out the criteria by which an authorized representative of the Secretary will be guided in requiring other safeguards on a mine-by-mine basis under § 75.1403. Other safeguards may be required.

(b) The authorized representative of the Secretary shall in writing advise the operator of a specific safeguard which is required pursuant to § 75.1403 and shall fix a time in which the operator shall provide and thereafter maintain such safeguard. If the safeguard is not provided within the time fixed and if it is not maintained thereafter, a notice shall be issued to the operator pursuant to section 104 of the Act.

(c) Nothing in the sections in the § 75.1403 series in this Subpart O precludes the issuance of a withdrawal order because of imminent danger.

§ 75.1403-2 Criteria—Hoists transporting materials; brakes.

Hoists and elevators used to transport materials should be equipped with brakes capable of stopping and holding the fully loaded platform, cage, skip, car, or other device at any point in the shaft, slope, or incline.

§ 75.1403-3 Criteria—Drum clutch; cage construction.

(a) The clutch of a free-drum on a personnel hoist should be provided with a locking mechanism or interlocked with the brake to prevent accidental withdrawal of the clutch.

(b) Cages used for hoisting persons should be constructed with the sides enclosed to a height of at least six feet and should have gates, safety chains, or bars across the ends of the cage when persons are being hoisted or lowered.

(c) Self-dumping cages, platforms, or other devices used for transportation of persons should have a locking device to prevent tilting when persons are transported.

(d) An attendant should be on duty at the surface when persons are being hoisted or lowered at the beginning and end of each shift.

(e) Precautions should be taken to protect persons working in shaft sumps.

(f) Workers should wear safety belts while doing work in or over shafts.

[48 FR 53239, Nov. 25, 1983]

§ 75.1403-4 Criteria—Automatic elevators.

(a) The doors of automatic elevators should be equipped with interlocking switches so arranged that the elevator car will be immovable while any door is opened or unlocked, and arranged so that such door or doors cannot be inadvertently opened when the elevator car is not at a landing.

(b) A “Stop” switch should be provided in the automatic elevator compartment that will permit the elevator to be stopped at any location in the shaft.

(c) A slack cable device should be used where appropriate on automatic elevators which will automatically shut-off the power and apply the brakes in the event the elevator is obstructed while descending.

(d) Each automatic elevator should be provided with a telephone or other effective communication system by which aid or assistance can be obtained promptly.

§ 75.1403-5 Criteria—Belt conveyors.

(a) Positive-acting stop controls should be installed along all belt conveyors used to transport men, and such controls should be readily accessible and maintained so that the belt can be stopped or started at any location.

(b) Belt conveyors used for regularly scheduled mantrips should be stopped while men are loading or unloading.

(c) All belt conveyors used for the transportation of persons should have a minimum vertical clearance of 18 inches from the nearest overhead projection when measured from the edge of the belt and there should be at least 36 inches of side clearance where men board or leave such belt conveyors.

(d) When men are being transported on regularly scheduled mantrips on belt conveyors the belt speed should not exceed 300 feet per minute when the vertical clearance is less than 24 inches, and should not exceed 350 feet per minute when the vertical clearance is 24 inches or more.

(e) Adequate illumination including colored lights or reflective signs should be installed at all loading and unloading stations. Such colored lights and reflective signs should be so located as to be observable to all persons riding the belt conveyor.

(f) After supplies have been transported on belt conveyors such belts should be examined for unsafe conditions prior to the transportation of men on regularly scheduled mantrips, and belt conveyors should be clear before men are transported.

(g) A clear travelway at least 24 inches wide should be provided on both sides of all belt conveyors installed after March 30, 1970. Where roof supports are installed within 24 inches of a belt conveyor, a clear travelway at least 24 inches wide should be provided on the side of such support farthest from the conveyor.

(h) On belt conveyors that do not transport men, stop and start controls should be installed at intervals not to exceed 1,000 feet. Such controls should be properly installed and positioned so as to be readily accessible.

(i) Telephone or other suitable communications should be provided at points where men or supplies are regularly loaded on or unloaded from the belt conveyors.

(j) Persons should not cross moving belt conveyors, except where suitable crossing facilities are provided.

§ 75.1403-6 Criteria—Self-propelled personnel carriers.

(a) Each self-propelled personnel carrier should:

(1) Be provided with an audible warning device;

(2) Be provided with a sealed-beam headlight, or its equivalent, on each end;

(3) Be provided with reflectors on both ends and sides.

(b) In addition, each track-mounted self-propelled personnel carrier should:

(1) Be provided with a suitable lifting jack and bar, which shall be secured or carried in a tool compartment;

(2) Be equipped with 2 separate and independent braking systems properly installed and well maintained;

(3) Be equipped with properly installed and well-maintained sanding devices, except that personnel carriers (jitneys), which transport not more than 5 men, need not be equipped with such sanding device;

(4) If an open type, be equipped with guards of sufficient strength and height to prevent personnel from being thrown from such carriers.

§ 75.1403-7 Criteria—Mantrips.

(a) Mantrips should be operated independently of any loaded trip, empty trip, or supply trip and should not be operated within 300 feet of any trip, including another mantrip.

(b) A sufficient number of mantrip cars should be provided to prevent overcrowding of men.

(c) Mantrips should not be pushed.

(d) Where mantrips are operated by locomotives on slopes such mantrips should be coupled to the front and rear by locomotives capable of holding such mantrips. Where ropes are used on slopes for mantrip haulage, such conveyances should be connected by chains, steel ropes, or other effective devices between mantrip cars and the rope.

(e) Safety goggles or eyeshields should be provided for all persons being transported in open-type mantrips.

(f) All trips, including trailers and sleds, should be operated at speeds consistent with conditions and the equipment used, and should be so controlled that they can be stopped within the limits of visibility.

(g) All mantrips should be under the direction of a supervisor and the operator of each mantrip should be familiar with the haulage safety rules and regulations.

(h) Men should proceed in an orderly manner to and from mantrips and no person should be permitted to get on or off a moving mantrip.

(i) [Reserved]

(j) Mantrips should not be permitted to proceed until the operator of the mantrip is assured that he has a clear road.

(k) Supplies or tools, except small hand tools or instruments, should not be transported with men.

(l) At places where men enter or leave mantrip conveyances, ample clearance should be provided and provisions made to prevent persons from coming in contact with energized electric circuits.

(m) The mine car next to a trolley locomotive should not be used to transport men. Such cars may be used to transport small tools and supplies. This is not to be construed as permitting the transportation of large or bulky supplies such as shuttle car wheel units, or similar material.

(n) Drop-bottom cars used to transport men should have the bottoms secured with an additional locking device.

(o) Extraneous materials or supplies should not be transported on top of equipment; however, materials and supplies that are necessary for or related to the operation of such equipment may be transported on top of such equipment if a hazard is not introduced.

[35 FR 17890, Nov. 20, 1970, as amended at 53 FR 46786, Nov. 18, 1988]

§ 75.1403-8 Criteria—Track haulage roads.

(a) The speed at which haulage equipment is operated should be determined by the condition of the roadbed, rails, rail joints, switches, frogs, and other elements of the track and the type and condition of the haulage equipment.

(b) Track haulage roads should have a continuous clearance on one side of at least 24 inches from the farthest projection of normal traffic. Where it is necessary to change the side on which clearance is provided, 24 inches of clearance should be provided on both sides for a distance of not less than 100 feet and warning signs should be posted at such locations.

(c) Track haulage roads developed after March 30, 1970, should have clearance on the “tight” side of at least 12 inches from the farthest projection of normal traffic. A minimum clearance of 6 inches should be maintained on the “tight” side of all track haulage roads developed prior to March 30, 1970.

(d) The clearance space on all track haulage roads should be kept free of loose rock, supplies, and other loose materials.

(e) Positive stopblocks or derails should be installed on all tracks near the top and at landings of shafts, slopes, and surface inclines.

§ 75.1403-9 Criteria—Shelter holes.

(a) Shelter holes should be provided on track haulage roads at intervals of not more than 105 feet unless otherwise approved by the Coal Mine Safety District Manager(s).

(b) Shelter holes should be readily accessible and should be at least 5 feet in depth, not more than 4 feet in width (except crosscuts used as shelter holes) and at least the height of the coal seam where the coal seam is less than 6 feet high and at least 6 feet in height where the coal seam is 6 feet or more in height.

(c) Shelter holes should be kept free of refuse and other obstructions. Crosscuts used as shelter holes should be kept free of refuse or other materials to a depth of at least 15 feet.

(d) Shelter holes should be provided at all manually operated doors and at switch throws except: (1) At room switches, or (2) at switches where more than 6 feet of side clearance is provided. The Coal Mine Safety District Manager(s) may permit exemption of this requirement if such shelter holes create a hazardous roof condition.

(e) At each underground slope landing where men pass and cars are handled, a shelter hole at least 10 feet in depth, 4 feet in width, and 6 feet in height should be provided.

§ 75.1403-10 Criteria—Haulage; general.

(a) A permissible trip light or other approved device such as reflectors, approved by the Coal Mine Safety District Manager(s), should be used on the rear of trips pulled, on the front of trips pushed and on trips lowered in slopes. However, trip lights or other approved devices need not be used on cars being shifted to and from loading machines, on cars being handled at loading heads, during gathering operations at working faces, when trailing locomotives are used, or on trips pulled by animals.

(b) Cars on main haulage roads should not be pushed, except where necessary to push cars from side tracks located near the working section to the producing entries and rooms, where necessary to clear switches and sidetracks, and on the approach to cages, slopes, and surface inclines.

(c) Warning lights or reflective signs or tapes should be installed along haulage roads at locations of abrupt or sudden changes in the overhead clearance.

(d) No person, other than the motorman and brakeman, should ride on a locomotive unless authorized by the mine foreman, and then only when safe riding facilities are provided. No person should ride on any loaded car or on the bumper of any car. However, the brakeman may ride on the rear bumper of the last car of a slow moving trip pulled by a locomotive.

(e) Positive-acting stopblocks or derails should be used where necessary to protect persons from danger of runaway haulage equipment.

(f) An audible warning should be given by the operator of all self-propelled equipment including off-track equipment, where persons may be endangered by the movement of the equipment.

(g) Locomotives and personnel carriers should not approach to within 300 feet of preceding haulage equipment, except trailing locomotives that are an integral part of the trip.

(h) A total of at least 36 inches of unobstructed side clearance (both sides combined) should be provided for all rubber-tired haulage equipment where such equipment is used.

(i) Off-track haulage roadways should be maintained as free as practicable from bottom irregularities, debris, and wet or muddy conditions that affect the control of the equipment.

(j) Operators of self-propelled equipment should face in the direction of travel.

(k) Mechanical steering and control devices should be maintained so as to provide positive control at all times.

(l) All self-propelled rubber-tired haulage equipment should be equipped with well maintained brakes, lights, and a warning device.

(m) On and after March 30, 1971, all tram control switches on rubber-tired equipment should be designed to provide automatic return to the stop or off position when released.

§ 75.1403-11 Criteria—Entrances to shafts and slopes.

All open entrances to shafts should be equipped with safety gates at the top and at each landing. Such gates should be self-closing and should be kept closed except when the cage is at such landing.

§ 75.1404 Automatic brakes; speed reduction gear.

[Statutory Provisions]

Each locomotive and haulage car used in an underground coal mine shall be equipped with automatic brakes, where space permits. Where space does not permit automatic brakes, locomotives and haulage cars shall be subject to speed reduction gear, or other similar devices approved by the Secretary, which are designed to stop the locomotives and haulage cars with the proper margin of safety.

§ 75.1404-1 Braking system.

A locomotive equipped with a dual braking system will be deemed to satisfy the requirements of § 75.1404 for a train comprised of such locomotive and haulage cars, provided the locomotive is operated within the limits of its design capabilities and at speeds consistent with the condition of the haulage road. A trailing locomotive or equivalent devices should be used on trains that are operated on ascending grades.

§ 75.1405 Automatic couplers.

[Statutory Provisions]

All haulage equipment acquired by an operator of a coal mine on or after March 30, 1971, shall be equipped with automatic couplers which couple by impact and uncouple without the necessity of persons going between the ends of such equipment. All haulage equipment without automatic couplers in use in a mine on March 30, 1970, shall also be so equipped within 4 years after March 30, 1970.

§ 75.1405-1 Automatic couplers, haulage equipment.

The requirement of § 75.1405 with respect to automatic couplers applies only to track haulage cars which are regularly coupled and uncoupled.

218 Wire Ropes

Source: Sections 75.1429 through 75.1438 appear at 48 FR 53239, Nov. 25, 1983, unless otherwise noted.

§ 75.1429 Guide ropes.

If guide ropes are used in shafts for personnel hoisting applications other than shaft development, the nominal strength (manufacturer's published catalog strength) of the guide rope at installation shall meet the minimum value calculated as follows: Minimum value = Static Load × 5.0.

§ 75.1430 Wire ropes; scope.

(a) Sections 75.1430 through 75.1438 apply to wire ropes in service used to hoist—

(1) Persons in shafts or slopes underground; or

(2) Loads in shaft or slope development when persons work below the suspended loads.

(b) These standards do not apply to wire ropes used for elevators.

§ 75.1431 Minimum rope strength.

At installation, the nominal strength (manufacturer's published catalog strength) of wire ropes used for hoisting shall meet the minimum rope strength values obtained by the following formulas in which “L” equals the maximum suspended rope length in feet:

(a) Winding drum ropes (all constructions, including rotation resistant).

For rope lengths less than 3,000 feet: Minimum Value = Static Load × (7.0−0.001L) For rope lengths 3,000 feet or greater: Minimum Value = Static Load × 4.0

(b) Friction drum ropes.

For rope lengths less than 4,000 feet: Minimum Value = Static Load × (7.0 − 0.0005L) For rope lengths 4,000 feet or greater: Minimum Value = Static Load × 5.0

(c) Tail ropes (balance ropes).

Minimum Value = Weight of Rope × 7.0

[48 FR 53239, Nov. 25, 1983; 48 FR 54975, Dec. 8, 1983]

§ 75.1432 Initial measurement.

After initial rope stretch but before visible wear occurs, the rope diameter of newly installed wire ropes shall be measured at least once in every third interval of active length and the measurements averaged to establish a baseline for subsequent measurements. A record of the measurements and the date shall be made by the person taking the measurements. This record shall be retained until the rope is retired from service.

[48 FR 53239, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995]

§ 75.1433 Examinations.

(a) At least once every fourteen calendar days, each wire rope in service shall be visually examined along its entire active length for visible structural damage, corrosion, and improper lubrication or dressing. In addition, visual examination for wear and broken wires shall be made at stress points, including the area near attachments, where the rope rests on sheaves, where the rope leaves the drum, at drum crossovers, and at change-of-layer regions. When any visible condition that results in a reduction of rope strength is present, the affected portion of the rope shall be examined on a daily basis.

(b) Before any person is hoisted with a newly installed wire rope or any wire rope that has not been examined in the previous fourteen calendar days, the wire rope shall be examined in accordance with paragraph (a) of this section.

(c) At least once every six months, nondestructive tests shall be conducted of the active length of the rope, or rope diameter measurements shall be made—

(1) Wherever wear is evident;

(2) Where the hoist rope rests on sheaves at regular stopping points;

(3) Where the hoist rope leaves the drum at regular stopping points; and

(4) At drum crossover and change-of-layer regions.

(d) At the completion of each examination required by paragraph (a) of this section, the person making the examination shall certify, by signature and date, that the examination has been made. If any condition listed in paragraph (a) of this standard is present, the person conducting the examination shall make a record of the condition and the date. Certifications and records of examinations shall be retained for one year.

(e) The person making the measurements or nondestructive tests as required by paragraph (c) of this section shall record the measurements or test results and the date. This record shall be retained until the rope is retired from service.

[48 FR 53239, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995]

§ 75.1434 Retirement criteria.

Unless damage or deterioration is removed by cutoff, wire ropes shall be removed from service when any of the following conditions occurs:

(a) The number of broken wires within a rope lay length, excluding filler wires, exceeds either—

(1) Five percent of the total number of wires; or

(2) Fifteen percent of the total number of wires within any strand;

(b) On a regular lay rope, more than one broken wire in the valley between strands in one rope lay length;

(c) A loss of more than one-third of the original diameter of the outer wires;

(d) Rope deterioration from corrosion;

(e) Distortion of the rope structure;

(f) Heat damage from any source;

(g) Diameter reduction due to wear that exceeds six percent of the baseline diameter measurement; or

(h) Loss of more than ten percent of rope strength as determined by nondestructive testing.

§ 75.1435 Load end attachments.

(a) Wire rope shall be attached to the load by a method that develops at least 80 percent of the nominal strength of the rope.

(b) Except for terminations where use of other materials is a design feature, zinc (spelter) shall be used for socketing wire ropes. Design feature means either the manufacturer's original design or a design approved by a registered professional engineer.

(c) Load end attachment methods using splices are prohibited.

§ 75.1436 Drum end attachment.

(a) For drum end attachment, wire rope shall be attached—

(1) Securely by clips after making one full turn around the drum spoke;

(2) Securely by clips after making one full turn around the shaft, if the drum is fixed to the shaft; or

(3) By properly assembled anchor bolts, clamps, or wedges, provided that the attachment is a design feature of the hoist drum. Design feature means either the manufacturer's original design or a design approved by a registered professional engineer.

(b) A minimum of three full turns of wire rope shall be on the drum when the rope is extended to its maximum working length.

§ 75.1437 End attachment retermination.

Damaged or deteriorated wire rope shall be removed by cutoff and the rope reterminated where there is—

(a) More than one broken wire at an attachment;

(b) Improper installation of an attachment;

(c) Slippage at an attachment; or

(d) Evidence of deterioration from corrosion at an attachment.

§ 75.1438 End attachment replacement.

Wire rope attachments shall be replaced when cracked, deformed, or excessively worn.

Subpart P Mine Emergencies
§ 75.1500 [Reserved]
§ 75.1501 Emergency evacuations.

(a) For each shift that miners work underground, there shall be in attendance a responsible person designated by the mine operator to take charge during mine emergencies involving a fire, explosion, or gas or water inundation.

(1) The responsible person shall have current knowledge of the assigned location and expected movements of miners underground, the operation of the mine ventilation system, the locations of the mine escapeways and refuge alternatives, the mine communications system, any mine monitoring system if used, locations of firefighting equipment, the mine's Emergency Response Plan, the Mine Rescue Notification Plan, and the Mine Emergency Evacuation and Firefighting Program of Instruction.

(2) The responsible person shall be trained annually in a course of instruction in mine emergency response, as prescribed by MSHA's Office of Educational Policy and Development. The course will include topics such as the following:

(i) Organizing a command center;

(ii) Coordinating firefighting personnel;

(iii) Deploying firefighting equipment;

(iv) Coordinating mine rescue personnel;

(v) Establishing fresh air base;

(vi) Deploying mine rescue teams;

(vii) Providing for mine gas sampling and analysis;

(viii) Establishing security;

(ix) Initiating an emergency mine evacuation;

(x) Contacting emergency personnel; and

(xi) Communicating appropriate information related to the emergency.

(3) The operator shall certify by signature and date after each responsible person has completed the training and keep the certification at the mine for 1 year.

(b) The responsible person shall initiate and conduct an immediate mine evacuation when there is a mine emergency which presents an imminent danger to miners due to fire or explosion or gas or water inundation. Only properly trained and equipped persons essential to respond to the mine emergency may remain underground.

(c) The mine operator shall instruct all miners of the identity of the responsible person designated by the operator for their workshift. The mine operator shall instruct miners of any change in the identity of the responsible person before the start of their workshift.

(d) Nothing in this section shall be construed to restrict the ability of other persons in the mine to warn of an imminent danger which warrants evacuation.

[68 FR 53049, Sept. 9, 2003, as amended at 73 FR 7655, Feb. 8, 2008; 73 FR 80697, Dec. 31, 2008]

§ 75.1502 Mine emergency evacuation and firefighting program of instruction.

Each operator of an underground coal mine shall adopt and follow a mine emergency evacuation and firefighting program that instructs all miners in the proper procedures they must follow if a mine emergency occurs.

(a) Program approval. The operator shall submit this program of instruction, and any revisions, for approval to the District Manager of the Coal Mine Safety and Health district in which the mine is located. Within 30 days of approval, the operator shall conduct training in accordance with the revised program.

(b) New or revised provisions. Before implementing any new or revised approved provision in the program of instruction, the operator shall instruct miners in the change.

(c) Instruction plan. The approved program shall include a specific plan designed to instruct miners on all shifts on the following:

(1) Procedures for—

(i) Evacuating the mine for mine emergencies that present an imminent danger to miners due to fire, explosion, or gas or water inundation;

(ii) Evacuating all miners not required for a mine emergency response; and

(iii) The rapid assembly and transportation of necessary miners, fire suppression equipment, and rescue apparatus to the scene of the mine emergency.

(2) The use, care, and maintenance of self-rescue devices, including hands-on training in the complete donning and transferring of all types of self-rescue devices used at the mine.

(3) The deployment, use, and maintenance of refuge alternatives.

(4) Scenarios requiring a discussion of options and a decision as to the best option for evacuation under each of the various mine emergencies (fires, explosions, or gas or water inundations). These options shall include:

(i) Encountering conditions in the mine or circumstances that require immediate donning of self-rescue devices.

(ii) Using continuous directional lifelines or equivalent devices, tethers, and doors;

(iii) Traversing undercasts or overcasts;

(iv) Switching escapeways, as applicable;

(v) Negotiating any other unique escapeway conditions; and

(vi) Using refuge alternatives.

(5) Location and use of the fire suppression and firefighting equipment and materials available in the mine.

(6) Location of the escapeways, exits, routes of travel to the surface, including the location of continuous directional lifelines or equivalent devices.

(7) Location, quantity, types, and use of stored SCSRs, as applicable.

(8) A review of the mine map; the escapeway system; the escape, firefighting, and emergency evacuation plan in effect at the mine; and the locations of refuge alternatives and abandoned areas.

(9) A description of how miners will receive annual expectations training that includes practical experience in donning and transferring SCSRs in smoke, simulated smoke, or an equivalent environment and breathing through a realistic SCSR training unit or device that provides the sensation of SCSR airflow resistance and heat.

(10) A summary of the procedures related to deploying refuge alternatives.

(11) A summary of the construction methods for 15 psi stoppings constructed prior to an event.

(12) A summary of the procedures related to refuge alternative use.

(d) Instructors. (1) The mine operator shall designate a person who has the ability, training, knowledge, or experience to conduct the mine emergency evacuation instruction and drills in his or her area of expertise.

(2) Persons conducting SCSR donning and transferring training shall be able to effectively train and evaluate whether miners can successfully don the SCSR and transfer to additional SCSR devices.

[71 FR 71452, Dec. 8, 2006, as amended at 73 FR 80697, Dec. 31, 2008]

§ 75.1503 Use of fire suppression equipment.

In addition to the approved program of instruction required by 30 CFR 75.1502, each operator of an underground coal mine shall ensure the following.

(a) Working section. At least two miners in each working section on each production shift shall be proficient in the use of all fire suppression equipment available on such working section, and know the location of such fire suppression equipment.

(b) Attended equipment. Each operator of attended equipment specified in 30 CFR 75.1107-1(c)(1), and each miner assigned to perform job duties at the job site in the direct line of sight of attended equipment as described in 30 CFR 75.1107-1(c)(2), shall be proficient in the use of fire suppression devices installed on such attended equipment.

(c) Maintenance shift. The shift foreman and at least one miner for every five miners working underground on a maintenance shift shall be proficient in the use of fire suppression equipment available in the mine, and know the location of such fire suppression equipment.

[71 FR 71452, Dec. 8, 2006]

§ 75.1504 Mine emergency evacuation training and drills.

Each operator of an underground coal mine shall conduct mine emergency evacuation training and drills and require all miners to participate.

(a) Schedule of training and drills. Each miner shall participate in a mine emergency evacuation training and drill once each quarter. Quarters shall be based on a calendar year (Jan-Mar, Apr-Jun, Jul-Sep, Oct-Dec). In addition—

(1) A newly hired miner, who has not participated in a mine emergency evacuation training and drill at the mine within the previous 3 months, shall participate in the next applicable mine emergency evacuation training and drill.

(2) Prior to assuming duties on a section or outby work location, a foreman shall travel both escapeways in their entirety.

(b) Content of quarterly training and drill. Each quarterly evacuation training and drill shall include the following:

(1) Hands-on training on all types of self-rescue devices used at the mine, which includes—

(i) Instruction and demonstration in the use, care, and maintenance of self-rescue devices;

(ii) The complete donning of the SCSR by assuming a donning position, opening the device, activating the device, inserting the mouthpiece, and putting on the nose clip; and

(iii) Transferring between all applicable self-rescue devices.

(2) Training that emphasizes the importance of—

(i) Recognizing when the SCSR is not functioning properly and demonstrating how to initiate and reinitiate the starting sequence;

(ii) Not removing the mouthpiece, even to communicate, until the miner reaches fresh air; and

(iii) Proper use of the SCSR by controlling breathing and physical exertion.

(3) A realistic escapeway drill that is initiated and conducted with a different approved scenario each quarter and during which each miner—

(i) Travels the primary or alternate escapeway in its entirety, alternating escapeways each quarter;

(ii) Physically locates and practices using the continuous directional lifelines or equivalent devices and tethers, and physically locates the stored SCSRs and refuge alternatives;

(iii) Traverses undercasts or overcasts and doors;

(iv) Switches escapeways, as applicable; and

(v) Negotiates any other unique escapeway conditions.

(4) A review of the mine and escapeway maps, the firefighting plan, and the mine emergency evacuation plan in effect at the mine, which shall include:

(i) Informing miners of the locations of fire doors, check curtains, changes in the routes of travel, and plans for diverting smoke from escapeways.

(ii) Locating escapeways, exits, routes of travel to the surface, abandoned areas, and refuge alternatives.

(5) Operation of the fire suppression equipment available in the mine and the location and use of firefighting equipment and materials.

(6) Reviewing the procedures for deploying refuge alternatives and components.

(7) For miners who will be constructing the 15 psi stoppings prior to an event, reviewing the procedures for constructing them.

(8) Reviewing the procedures for use of the refuge alternatives and components.

(9) Task training in proper transportation of the refuge alternatives and components.

(c) Annual expectations training. Over the course of each year, each miner shall participate in expectations training that includes the following:

(1) Donning and transferring SCSRs in smoke, simulated smoke, or an equivalent environment.

(2) Breathing through a realistic SCSR training unit that provides the sensation of SCSR airflow resistance and heat.

(3) Deployment and use of refuge alternatives similar to those in use at the mine, including—

(i) Deployment and operation of component systems; and

(ii) Instruction on when to use refuge alternatives during a mine emergency, emphasizing that it is the last resort when escape is impossible.

(4) A miner shall participate in expectations training within one quarter of being employed at the mine.

(d) Certification of training and drills. At the completion of each training or drill required in this section, the operator shall certify by signature and date that the training or drill was held in accordance with the requirements of this section.

(1) This certification shall include the names of the miners participating in the training or drill. For each miner, this certification shall list the content of the training or drill component completed, including the escapeway traveled and scenario used, as required in paragraphs (b) and (c) of this section.

(2) Certifications shall be kept at the mine for one year.

(3) Upon request, the certifications shall be made available to an authorized representative of the Secretary and the representative of the miners.

(4) Upon request, a copy of the certification that shows his or her own training shall be provided to the participating miner.

[71 FR 71452, Dec. 8, 2006, as amended at 73 FR 80698, Dec. 31, 2008]

§ 75.1505 Escapeway maps.

(a) Content and accessibility. An escapeway map shall show the designated escapeways from the working sections or the miners' work stations to the surface or the exits at the bottom of the shaft or slope, refuge alternatives, and SCSR storage locations. The escapeway map shall be posted or readily accessible for all miners—

(1) In each working section;

(2) In each area where mechanized mining equipment is being installed or removed;

(3) At the refuge alternative; and

(4) At a surface location of the mine where miners congregate, such as at the mine bulletin board, bathhouse, or waiting room.

(b) Keeping maps current. All maps shall be kept up-to-date and any change in route of travel, location of doors, location of refuge alternatives, or direction of airflow shall be shown on the maps by the end of the shift on which the change is made.

(c) Informing affected miners. Miners underground on a shift when any such change is made shall be notified immediately of the change and other affected miners shall be informed of the change before entering the underground areas of the mine.

[71 FR 71452, Dec. 8, 2006, as amended at 73 FR 80698, Dec. 31, 2008]

§ 75.1506 Refuge alternatives.

(a) Each operator shall provide refuge alternatives and components as follows:

(1) Prefabricated self-contained units, including the structural, breathable air, air monitoring, and harmful gas removal components of the unit, shall be approved under 30 CFR part 7; and

(2) The structural components of units consisting of 15 psi stoppings constructed prior to an event shall be approved by the District Manager, and the breathable air, air monitoring, and harmful gas removal components of these units shall be approved under 30 CFR part 7.

(3) Prefabricated refuge alternative structures that states have approved and those that MSHA has accepted in approved Emergency Response Plans (ERPs) that are in service prior to March 2, 2009 are permitted until December 31, 2018, or until replaced, whichever comes first. Breathable air, air-monitoring, and harmful gas removal components of either a prefabricated self-contained unit or a unit consisting of 15 psi stoppings constructed prior to an event in a secure space and an isolated atmosphere that states have approved and those that MSHA has accepted in approved ERPs that are in use prior to March 2, 2009 are permitted until December 31, 2013, or until replaced, whichever comes first. Refuge alternatives consisting of materials pre-positioned for miners to deploy in a secure space with an isolated atmosphere that MSHA has accepted in approved ERPs that are in use prior to March 2, 2009 are permitted until December 31, 2010, or until replaced, whichever comes first.

(b) Except as permitted under paragraph (a)(3) of this section, each operator shall provide refuge alternatives with sufficient capacity to accommodate all persons working underground.

(1) Refuge alternatives shall provide at least 15 square feet of floor space per person and 30 to 60 cubic feet of volume per person according to the following chart. The airlock can be included in the space and volume if waste is disposed outside the refuge alternative.

Mining height (inches) | Unrestricted volume (cubic feet) per person*

36 or less | 30

>36-≤42 | 37.5

>42-≤48 | 45

>48-≤54 | 52.5

>54 | 60

* Includes an adjustment of 12 inches for clearances.

(2) Refuge alternatives for working sections shall accommodate the maximum number of persons that can be expected on or near the section at any time.

(3) Each refuge alternative for outby areas shall accommodate persons reasonably expected to use it.

(c) Refuge alternatives shall be provided at the following locations:

(1) Within 1,000 feet from the nearest working face and from locations where mechanized mining equipment is being installed or removed except that for underground anthracite coal mines that have no electrical face equipment, refuge alternatives shall be provided if the nearest working face is greater than 2,000 feet from the surface.

(2) Spaced within one-hour travel distances in outby areas where persons work such that persons in outby areas are never more than a 30-minute travel distance from a refuge alternative or safe exit. However, the operator may request and the District Manager may approve a different location in the ERP. The operator's request shall be based on an assessment of the risk to persons in outby areas, considering the following factors: proximity to seals; proximity to potential fire or ignition sources; conditions in the outby areas; location of stored SCSRs; and proximity to the most direct, safe, and practical route to an intake escapeway.

(d) Roof and rib support for refuge alternative locations shall be specified in the mine's roof control plan.

(e) The operator shall protect the refuge alternative and contents from damage during transportation, installation, and storage.

(f) A refuge alternative shall be removed from service if examination reveals damage that interferes with the functioning of the refuge alternative or any component.

(1) If a refuge alternative is removed from service, the operator shall withdraw all persons from the area serviced by the refuge alternative, except those persons referred to in § 104(c) of the Mine Act.

(2) Refuge alternative components removed from service shall be replaced or be repaired for return to service in accordance with the manufacturer's specifications.

(g) At all times, the site and area around the refuge alternative shall be kept clear of machinery, materials, and obstructions that could interfere with the deployment or use of the refuge alternative.

(h) Each refuge alternative shall be conspicuously identified with a sign or marker as follows:

(1) A sign or marker made of a reflective material with the word “REFUGE” shall be posted conspicuously at each refuge alternative.

(2) Directional signs made of a reflective material shall be posted leading to each refuge alternative location.

(i) During use of the refuge alternative, the atmosphere within the refuge alternative shall be monitored. Changes or adjustments shall be made to reduce the concentration of methane to less than 1 percent; to reduce the concentration of carbon dioxide to 1 percent or less and excursions not exceeding 2.5 percent; and to reduce the concentration of carbon monoxide to 25 ppm or less. Oxygen shall be maintained at 18.5 to 23 percent.

(j) Refuge alternatives shall contain a fire extinguisher that—

(1) Meets the requirements for portable fire extinguishers used in underground coal mines under this part;

(2) Is appropriate for extinguishing fires involving the chemicals used for harmful gas removal; and

(3) Uses a low-toxicity extinguishing agent that does not produce a hazardous by-product when activated.

[73 FR 80698, Dec. 31, 2008]

§ 75.1507 Emergency Response Plan; refuge alternatives.

(a) The Emergency Response Plan (ERP) shall include the following for each refuge alternative and component:

(1) The types of refuge alternatives used in the mine, i.e., a prefabricated self-contained unit or a unit consisting of 15 psi stoppings constructed prior to an event in a secure space and an isolated atmosphere.

(2) Procedures or methods for maintaining approved refuge alternatives and components.

(3) The rated capacity of each refuge alternative, the number of persons expected to use each refuge alternative, and the duration of breathable air provided per person by the approved breathable air component of each refuge alternative.

(4) The methods for providing breathable air with sufficient detail of the component's capability to provide breathable air over the duration stated in the approval.

(5) The methods for providing ready backup oxygen controls and regulators.

(6) The methods for providing an airlock and for providing breathable air in the airlock, except where adequate positive pressure is maintained.

(7) The methods for providing sanitation facilities.

(8) The methods for harmful gas removal, if necessary.

(9) The methods for monitoring gas concentrations, including charging and calibration of equipment.

(10) The method for providing lighting sufficient for persons to perform tasks.

(11) Suitable locations for the refuge alternatives and an affirmative statement that the locations are—

(i) Not within direct line of sight of the working face; and

(ii) Where feasible, not placed in areas directly across from, nor closer than 500 feet radially from, belt drives, take-ups, transfer points, air compressors, explosive magazines, seals, entrances to abandoned areas, and fuel, oil, or other flammable or combustible material storage. However, the operator may request and the District Manager may approve an alternative location in the ERP if mining involves two-entry systems or yield pillars in a longwall that would prohibit locating the refuge alternative out of direct line of sight of the working face.

(12) The maximum mine air temperature at each of the locations where refuge alternatives are to be placed.

(b) For a refuge alternative consisting of 15 psi stoppings constructed prior to an event in a secure space and an isolated atmosphere, the ERP shall specify that—

(1) The breathable air components shall be approved by MSHA; and

(2) The refuge alternative can withstand exposure to a flash fire of 300 degrees Fahrenheit (°F) for 3 seconds and a pressure wave of 15 pounds per square inch (psi) overpressure for 0.2 seconds.

(c) If the refuge alternative sustains persons for only 48 hours, the ERP shall detail advanced arrangements that have been made to assure that persons who cannot be rescued within 48 hours will receive additional supplies to sustain them until rescue. Advance arrangements shall include the following:

(1) Pre-surveyed areas for refuge alternatives with closure errors of less than 20,000:1.

(2) An analysis to demonstrate that the surface terrain, the strata, the capabilities of the drill rig, and all other factors that could affect drilling are such that a hole sufficient to provide required supplies and materials reliably can be promptly drilled within 48 hours of an accident at a mine.

(3) Permissions to cross properties, build roads, and construct drill sites.

(4) Arrangement with a drilling contractor or other supplier of drilling services to provide a suitable drilling rig, personnel and support so that a hole can be completed to the refuge alternative within 48 hours.

(5) Capability to promptly transport a drill rig to a pre-surveyed location such that a drilled hole would be completed and located near a refuge alternative structure within 48 hours of an accident at a mine.

(6) The specifications of pipes, air lines, and approved fans or approved compressors that will be used.

(7) A method for assuring that within 48 hours, breathable air shall be provided.

(8) A method for assuring the immediate availability of a backup source for supplying breathable air and a backup power source for surface installations.

(d) The ERP shall specify that the refuge alternative is stocked with the following:

(1) A minimum of 2,000 calories of food and 2.25 quarts of potable water per person per day in approved containers sufficient to sustain the maximum number of persons reasonably expected to use the refuge alternative for at least 96 hours, or for 48 hours if advance arrangements are made under paragraph (c) of this section;

(2) A manual that contains sufficient detail for each refuge alternative or component addressing in-mine transportation, operation, and maintenance of the unit;

(3) Sufficient quantities of materials and tools to repair components; and

(4) First aid supplies.

[73 FR 80699, Dec. 31, 2008]

§ 75.1508 Training and records for examination, maintenance and repair of refuge alternatives and components.

(a) Persons examining, maintaining, or repairing refuge alternatives and components shall be instructed in how to perform this work.

(1) The operator shall assure that all persons assigned to examine, maintain, and repair refuge alternatives and components are trained.

(2) The mine operator shall certify, by signature and date, the training of persons who examine, maintain, and repair refuge alternatives and components.

(b) At the completion of each repair, the person conducting the maintenance or repair shall make a record of all corrective action taken.

(c) Training certifications and repair records shall be kept at the mine for one year.

[73 FR 80699, Dec. 31, 2008]

Subpart Q Communications
§ 75.1600 Communications.

[Statutory Provisions]

Telephone service or equivalent two-way communication facilities, approved by the Secretary or his authorized representative, shall be provided between the surface and each landing of main shafts and slopes and between the surface and each working section of any coal mine that is more than 100 feet from a portal.

§ 75.1600-1 Communication facilities; main portals; installation requirements.

A telephone or equivalent two-way communication facility shall be located on the surface within 500 feet of all main portals, and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a location where a responsible person who is always on duty when men are underground can hear the facility and respond immediately in the event of an emergency.

[38 FR 29999, Oct. 31, 1973]

§ 75.1600-2 Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

(a) Telephones or equivalent two-way communication facilities provided at each working section shall be located not more than 500 feet outby the last open crosscut and not more than 800 feet from the farthest point of penetration of the working places on such section.

(b) The incoming communication signal shall activate an audible alarm, distinguishable from the surrounding noise level, or a visual alarm that can be seen by a miner regularly employed on the working section.

(c) If a communication system other than telephones is used and its operation depends entirely upon power from the mine electric system, means shall be provided to permit continued communication in the event the mine electric power fails or is cut off; provided, however, that where trolley phones and telephones are both used, an alternate source of power for the trolley phone system is not required.

(d) Trolley phones connected to the trolley wire shall be grounded in accordance with Subpart H of this part.

(e) Telephones or equivalent two-way communication facilities shall be maintained in good operating condition at all times. In the event of any failure in the system that results in loss of communication, repairs shall be started immediately, and the system restored to operating condition as soon as possible.

[38 FR 29999, Oct. 31, 1973]

§ 75.1600-3 Communications facilities; refuge alternatives.

(a) Refuge alternatives shall be provided with a communications system that consists of—

(1) A two-way communication facility that is a part of the mine communication system, which can be used from inside the refuge alternative; and

(2) An additional communication system and other requirements as defined in the communications portion of the operator's approved Emergency Response Plan.

[73 FR 80700, Dec. 31, 2008]

Subpart R Miscellaneous
§ 75.1700 Oil and gas wells.

[Statutory Provisions]

Each operator of a coal mine shall take reasonable measures to locate oil and gas wells penetrating coalbeds or any underground area of a coal mine. When located, such operator shall establish and maintain barriers around such oil and gas wells in accordance with State laws and regulations, except that such barriers shall not be less than 300 feet in diameter, unless the Secretary or his authorized representative permits a lesser barrier consistent with the applicable State laws and regulations where such lesser barrier will be adequate to protect against hazards from such wells to the miners in such mine, or unless the Secretary or his authorized representative requires a greater barrier where the depth of the mine, other geologic conditions, or other factors warrant such a greater barrier.

§ 75.1702 Smoking; prohibition.

[Statutory Provisions]

No person shall smoke, carry smoking materials, matches, or lighters underground, or smoke in or around oil houses, explosives magazines, or other surface areas where such practice may cause a fire or explosion. The operator shall institute a program, approved by the Secretary, to insure that any person entering the underground area of the mine does not carry smoking materials, matches, or lighters.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1702-1 Smoking programs.

Programs required under § 75.1702 shall be submitted to the Coal Mine Safety District Manager for approval on or before May 30, 1970.

§ 75.1703 Portable electric lamps.

[Statutory Provisions]

Persons underground shall use only permissible electric lamps approved by the Secretary for portable illumination. No open flame shall be permitted in the underground area of any coal mine, except as permitted under § 75.1106.

§ 75.1703-1 Permissible lamps.

Lamps approved by the Bureau of Mines or the Mine Safety and Health Administration under Part 19 or Part 20 of this chapter (Bureau of Mines Schedule 6D and Schedule 10C) are approved lamps for the purposes of § 75.1703.

§ 75.1707-1 New working section.

The term “new working section” as used in § 75.1707 means any extension of the belt or trolley haulage system in main, cross, and room entries necessary for the development of the mine on and after March 30, 1970. Room entries being developed as of March 30, 1970, with certified stop line limitations as shown on the mine map and retreating panels shall not be considered as new working sections.

§ 75.1708 Surface structures, fireproofing.

[Statutory Provisions]

After March 30, 1970, all structures erected on the surface within 100 feet of any mine opening shall be of fireproof construction. Unless structures existing on or prior to such date which are located within 100 feet of any mine opening are of such construction, fire doors shall be erected at effective points in mine openings to prevent smoke or fire from outside sources endangering miners underground. These doors shall be tested at least monthly to insure effective operation. A record of such tests shall be kept in an area on the surface of the mine chosen by the operator to minimize the danger of destruction by fire or other hazard and shall be available for inspection by interested persons.

§ 75.1708-1 Surface structures; fireproof construction.

Structures of fireproof construction is interpreted to mean structures with fireproof exterior surfaces.

§ 75.1709 Accumulations of methane and coal dust on surface coal-handling facilities.

[Statutory Provisions]

Adequate measures shall be taken to prevent methane and coal dust from accumulating in excessive concentrations in or on surface coal-handling facilities, but in no event shall methane be permitted to accumulate in concentrations in or on surface coal-handling facilities in excess of limits established for methane by the Secretary on and after March 30, 1971. Where coal is dumped at or near air-intake openings, provisions shall be made to avoid dust from entering the mine.

§ 75.1710 Canopies or cabs; diesel-powered and electric face equipment.

In any coal mine where the height of the coalbed permits, an authorized representative of the Secretary may require that diesel-powered and electric face equipment, including shuttle cars, be provided with substantially constructed canopies or cabs to protect the miners operating such equipment from roof falls and from rib and face rolls.

[61 FR 55527, Oct. 25, 1996]

§ 75.1710-1 Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements.

(a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars, which is employed in the active workings of each underground coal mine on and after January 1, 1973, shall, in accordance with the schedule of time specified in paragraphs (a) (1), (2), (3), (4), (5), and (6) of this section, be equipped with substantially constructed canopies or cabs, located and installed in such a manner that when the operator is at the operating controls of such equipment he shall be protected from falls of roof, face, or rib, or from rib and face rolls. The requirements of this paragraph (a) shall be met as follows:

(1) On and after January 1, 1974, in coal mines having mining heights of 72 inches or more;

(2) On and after July 1, 1974, in coal mines having mining heights of 60 inches or more, but less than 72 inches;

(3) On and after January 1, 1975, in coal mines having mining heights of 48 inches or more, but less than 60 inches;

(4) On and after July 1, 1975, in coal mines having mining heights of 36 inches or more, but less than 48 inches;

(5)(i) On and after January 1, 1976, in coal mines having mining heights of 30 inches or more, but less than 36 inches,

(ii) On and after July 1, 1977, in coal mines having mining heights of 24 inches or more, but less than 30 inches, and

(6) On and after July 1, 1978, in coal mines having mining heights of less than 24 inches.

(b)(1) For purposes of this section, a canopy means a structure which provides overhead protection against falls of roof.

(2) For purposes of this section, a cab means a structure which provides overhead and lateral protection against falls of roof, rib, and face, or rib and face rolls.

(c) In determining whether to install substantially constructed canopies as opposed to substantially constructed cabs, the operator shall consider and take into account the following factors:

(1) The mining method used;

(2) Physical limitations, including but not limited to the dip of the coalbed, and roof, rib, and face conditions;

(3) Previous accident experience, if any, caused by falls of roof, rib, and face, or rib and face rolls;

(4) Overhead protection, such as that afforded by a substantially constructed canopy, against falls of roof will always be required; and

(5) Lateral protection, such as that afforded by a substantially constructed cab, may also be necessary where the occurrence of falls of rib and face, or rib and face rolls is likely.

(d) For purposes of this section, a canopy or cab will be considered to be substantially constructed if a registered engineer certifies that such canopy or cab has the minimum structural capacity to support elastically:

(1) A dead weight load of 18,000 pounds, or

(2) 15 p.s.i. distributed uniformly over the plan view area of the structure, whichever is lesser.

(e) Evidence of the certification required by paragraph (d) of this section shall be furnished by attaching a plate, label, or other appropriate marking to the canopy or cab for which certification has been made, stating that such canopy or cab meets the minimum requirements for structural capacity set forth in paragraph (d) of this section. Written evidence of such certification shall also be retained by the operator, and shall be made available to an authorized representative of the Secretary upon request. Written evidence of certification may consist of the report of the registered engineer who certified the canopy or cab, or of information from the manufacturer of the canopy or cab stating that a registered engineer has certified that the canopy or cab meets the minimum requirements for structural capacity set forth in paragraph (d) of this section.

(f) An operator may apply to the Director of Technical Support, Mine Safety and Health Administration, Department of Labor, 200 Constitution Avenue NW, Washington, DC 20210, for approval of the installation of devices to be used in lieu of substantially constructed canopies or cabs on self-propelled diesel-powered and electric face equipment. The Director of Technical Support may approve such devices if he determines that the use thereof will afford the equipment operator no less than the same measure of protection from falls of roof, face, or rib, or from rib and face rolls as would a substantially constructed canopy or cab meeting the requirements of this section.

[37 FR 20690, Oct. 3, 1972, as amended at 41 FR 23200, June 9, 1976; 43 FR 12320, Mar. 24, 1978; 47 FR 28096, June 29, 1982; 61 FR 55527, Oct. 25, 1996; 67 FR 38386, June 4, 2002; 80 FR 52992, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

Effective Date Note:At 42 FR 34877, July 7, 1977, the dates appearing in paragraphs (a)(5)(ii) and (a)(6) of § 75.1710-1 were suspended indefinitely, effective July 1, 1977.

§ 75.1711 Sealing of mines.

[Statutory Provisions]

On or after March 30, 1970, the opening of any coal mine that is declared inactive by the operator, or is permanently closed, or abandoned for more than 90 days, shall be sealed by the operator in a manner prescribed by the Secretary. Openings of all other mines shall be adequately protected in a manner prescribed by the Secretary to prevent entrance by unauthorized persons.

§ 75.1711-1 Sealing of shaft openings.

Shaft openings required to be sealed under § 75.1711 shall be effectively capped or filled. Filling shall be for the entire depth of the shaft and, for the first 50 feet from the bottom of the coalbed, the fill shall consist of incombustible material. Caps consisting of a 6-inch thick concrete cap or other equivalent means may be used for sealing. Caps shall be equipped with a vent pipe at least 2 inches in diameter extending for a distance of at least 15 feet above the surface of the shaft.

§ 75.1711-2 Sealing of slope or drift openings.

Slope or drift openings required to be sealed under § 75.1711 shall be sealed with solid, substantial, incombustible material, such as concrete blocks, bricks or tile, or shall be completely filled with incombustible material for a distance of at least 25 feet into such openings.

§ 75.1711-3 Openings of active mines.

The openings of all mines not declared by the operator, to be inactive, permanently closed, or abandoned for less than 90 days shall be adequately fenced or posted with conspicuous signs prohibiting the entrance of unauthorized persons.

§ 75.1712 Bath houses and toilet facilities.

[Statutory Provisions]

The Secretary may require any operator to provide adequate facilities for the miners to change from the clothes worn underground, to provide for the storing of such clothes from shift to shift, and to provide sanitary and bathing facilities. Sanitary toilet facilities shall be provided in the active workings of the mine when such surface facilities are not readily accessible to the active workings.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities.

Except where a waiver has been granted pursuant to the provisions of § 75.1712-4, each operator of an underground coal mine shall on and after December 30, 1970, provide bathing facilities, clothing change rooms, and sanitary facilities, as hereinafter prescribed, for the use of the miners at the mine.

§ 75.1712-2 Location of surface facilities.

Bathhouses, change rooms, and sanitary toilet facilities shall be in a location convenient for the use of the miners. Where such facilities are designed to serve more than one mine, they shall be centrally located so as to be as convenient for the use of the miners in all the mines served by such facilities.

§ 75.1712-3 Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

(a) All bathing facilities, change rooms, and sanitary toilet facilities shall be provided with adequate light, heat, and ventilation so as to maintain a comfortable air temperature and to minimize the accumulation of moisture and odors, and such facilities shall be maintained in a clean and sanitary condition.

(b) Bathing facilities, change rooms, and sanitary toilet facilities shall be constructed and equipped so as to comply with applicable State and local building codes: Provided, however, That where no State or local building codes apply to such facilities, or where no State or local building codes exist, such facilities shall be constructed and equipped so as to meet the minimum construction requirements of the National Building Code; and the minimum plumbing requirements of the U.S.A. Standard Plumbing Code, ASA A40.8-1955.

(c) In addition to the minimum requirements specified in paragraphs (a) and (b) of this § 75.1712-3, facilities maintained in accordance with § 75.1712-1 shall include the following:

(1) Bathing facilities. (i) Showers shall be provided with both hot and cold water.

(ii) At least one shower head shall be provided where five or less miners use such showers.

(iii) Where five or more miners use such showers, sufficient showers shall be furnished to provide approximately one shower head for each five miners.

(iv) A suitable cleansing agent shall be provided for use at each shower.

(2) Sanitary toilet facilities. (i) At least one sanitary flush toilet shall be provided where 10 or less miners use such facilities.

(ii) Where 10 or more miners use such sanitary toilet facilities, sufficient toilets shall be furnished to provide approximately one sanitary flush toilet for each 10 miners.

(iii) Where 30 or more miners use sanitary toilet facilities, one urinal may be substituted for one sanitary flush toilet, however, where such substitutions are made they shall not reduce the number of toilets below a ratio of two toilets to one urinal.

(iv) An adequate supply of toilet paper shall be provided with each toilet.

(v) Adequate handwashing facilities or hand lavatories shall be provided in or adjacent to each toilet facility.

(3) Change rooms. (i) Individual clothes storage containers or lockers shall be provided for storage of miners clothing and other incidental personal belongings during and between shifts.

(ii) Change rooms shall be provided with ample space to permit the use of such facilities by all miners changing clothes prior to and after each shift.

§ 75.1712-4 Waiver of surface facilities requirements.

The Coal Mine Safety District Manager for the district in which the mine is located may, upon written application by the operator, waive any or all of the requirements of §§ 75.1712-1 through 75.1712-3 if he determines that the operator of the mine cannot or need not meet any part or all of such requirements, and, upon issuance of such waiver, he shall set forth the facilities which will not be required and the specific reason or reasons for such waiver.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1712-5 Application for waiver of surface facilities.

Applications for waivers of the requirements of §§ 75.1712-1 through 75.1712-3 shall be filed with the Coal Mine Safety District Manager and shall contain the following information:

(a) The name and address of the mine operator;

(b) The name and location of the mine;

(c) A statement explaining why, in the opinion of the operator, the installation or maintenance of the facilities is impractical or unnecessary.

§ 75.1712-6 Underground sanitary facilities; installation and maintenance.

(a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary toilet in a dry location under protected roof, within 500 feet of each working place in the mine where miners are regularly employed during the mining cycle. A single sanitary toilet may serve two or more working places in the same mine, if it is located within 500 feet of each such working place.

(b) Sanitary toilets shall have an attached toilet seat with a hinged lid and a toilet paper holder together with an adequate supply of toilet tissue, except that a toilet paper holder is not required for an unenclosed toilet facility.

(c) Only flush or nonflush chemical or biological toilets, sealed bag toilets, and vault toilets meet the requirements of this section. Privies and combustion or incinerating toilets are prohibited underground.

[68 FR 37087, June 23, 2003]

§ 75.1712-7 Underground sanitary facilities; waiver of requirements.

If it has been determined by the Coal Mine Safety District Manager for the district in which the mine is located that sanitary toilets cannot be provided and maintained within 500 feet of a working place because of the thickness of the coal seam or because of any other physical restriction in the underground workings, he may, upon written application by the operator, waive the location requirements for underground sanitary facilities with respect to such working place.

§ 75.1712-8 Application for waiver of location requirements for underground sanitary facilities.

Applications for waivers of the location requirements of § 75.1712-6 shall be filed with the Coal Mine Safety District Manager and shall contain the following information:

(a) The name and address of the mine operator;

(b) The name and location of the mine;

(c) The thickness of the coal seam in each working place in the mine for which a waiver is requested; and

(d) Other physical restrictions in the mine (for example, poor roof conditions, excessive water, timbering, etc.).

If a sanitary toilet cannot be installed within 500 feet of a working place because of physical conditions other than the thickness of the coal seam, the operator shall also include a short statement specifying areas in the mine which could be considered possible alternative sites for installation of such facilities.

§ 75.1712-9 Issuance of waivers.

Following the receipt of an application submitted in accordance with the provisions of § 75.1712-8, the Coal Mine Safety District Manager shall, if he determines that the operator cannot meet the location requirements of § 75.1712-6 with respect to any or all of the working places in the mine because of the coal seam thickness or because of other physical restriction, issue a waiver of the requirements of this section and designate an alternative site for installation of such facilities. The waiver issued shall specify each working place to which it shall apply, set forth the reasons for such waiver, and the reasons for designation of the alternative site.

§ 75.1712-10 Underground sanitary facilities; maintenance.

Sanitary toilets shall be regularly maintained in a clean and sanitary condition. Holding tanks shall be serviced and cleaned when full and in no case less than once each week by draining or pumping or by removing them to the surface for cleaning or recharging. Transfer tanks and transfer equipment used underground shall be equipped with suitable fittings to permit complete drainage of holding tanks without spillage and allow for the sanitary transportation of wastes to the surface. Waste shall be disposed of on the surface in accordance with State and local laws and regulations.

§ 75.1713 Emergency medical assistance; first-aid.

[Statutory Provisions]

Each operator shall make arrangements in advance for obtaining emergency medical assistance and transportation for injured persons. Emergency communications shall be provided to the nearest point of assistance. Selected agents of the operator shall be trained in first-aid and first-aid training shall be made available to all miners. Each coal mine shall have an adequate supply of first-aid equipment located on the surface, at the bottom of shafts and slopes, and at other strategic locations near the working faces. In fulfilling each of the requirements of this section, the operator shall meet at least minimum requirements prescribed by the Secretary of Health and Human Services.

[35 FR 17890, Nov. 20, 1970, as amended at 47 FR 14696, Apr. 6, 1982; 60 FR 33723, June 29, 1995]

§ 75.1713-1 Arrangements for emergency medical assistance and transportation for injured persons; agreements; reporting requirements; posting requirements.

(a) Each operator of an underground coal mine shall make arrangements with a licensed physician, medical service, medical clinic, or hospital to provide 24-hour emergency medical assistance for any person injured at the mine.

(b) Each operator of an underground coal mine shall make arrangements with an ambulance service, or otherwise provide, for 24-hour emergency transportation for any person injured at the mine.

(c) Each operator shall, on or before December 30, 1970, report to the District Manager for the district in which the mine is located the name, title and address of the physician, medical service, medical clinic, hospital or ambulance service with whom arrangements have been made, or otherwise provided, in accordance with the provisions of paragraphs (a) and (b) of this § 75.1713-1.

(d) Each operator shall, within 10 days after any change of the arrangements required to be reported under the provisions of this § 75.1713-1, report such changes to the District Manager. If such changes involve a substitution of persons, the operator shall provide the name, title, and address of the person substituted together with the name and address of the medical service, medical clinic, hospital, or ambulance service with which such person or persons are associated.

(e) Each operator shall, immediately after making an arrangement required under the provisions of paragraphs (a) and (b) of this § 75.1713-1, or immediately after any change of such arrangement, post at appropriate places at the mine the names, titles, addresses, and telephone numbers of all persons or services currently available under such arrangements to provide medical assistance and transportation at the mine.

§ 75.1713-2 Emergency communications; requirements.

(a) Each operator of an underground coal mine shall establish and maintain a communication system from the mine to the nearest point of medical assistance for use in an emergency.

(b) The emergency communication system required to be maintained under paragraph (a) of this § 75.1713-2 may be established by telephone or radio transmission or by any other means of prompt communication to any facility (for example, the local sheriff, the State highway patrol, or local hospital) which has available the means of communication with the person or persons providing emergency medical assistance or transportation in accordance with the provisions of § 75.1713-1.

§ 75.1713-3 First-Aid training; supervisory employees.

The mine operator shall conduct first-aid training courses for selected supervisory employees at the mine. Within 60 days after the selection of a new supervisory employee to be so trained, the mine operator shall certify by signature and date the name of the employee and date on which the employee satisfactorily completed the first-aid training course. The certification shall be kept at the mine and made available on request to an authorized representative of the Secretary.

[56 FR 1478, Jan. 14, 1991]

§ 75.1713-4 First-aid training program; availability of instruction to all miners.

On or before June 30, 1971, each operator of an underground coal mine shall make available to all miners employed in the mine a course of instruction in first-aid conducted by the operator or under the auspices of the operator, and such a course of instruction shall be made available to newly employed miners within 6 months after the date of employment.

§ 75.1713-5 First-aid training program; retraining of supervisory employees; availability to all miners.

Beginning January 1, 1971, each operator of an underground coal mine shall conduct refresher first-aid training courses each calendar year for all selected supervisory employees, and make available refresher first-aid training courses to all miners employed in the mine.

§ 75.1713-6 First-aid training program; minimum requirements.

(a) All first-aid training programs required under the provisions of §§ 75.1713-3 and 75.1713-4 shall include 10 class hours of training in a course of instruction similar to that outlined in “First Aid, A Bureau of Mines Instruction Manual.”

(b) Refresher first-aid training programs required under the provisions of § 75.1713-5 shall include five class hours of refresher training in a course of instruction similar to that outlined in “First Aid, A Bureau of Mines Instruction Manual.”

§ 75.1713-7 First-aid equipment; location; minimum requirements.

(a) Each operator of an underground coal mine shall maintain a supply of the first-aid equipment set forth in paragraph (b) of this § 75.1713-7 at each of the following locations:

(1) At the mine dispatcher's office or other appropriate work area on the surface in close proximity to the mine entry;

(2) At the bottom of each regularly traveled slope or shaft; however, where the bottom of such slope or shaft is not more than 1,000 feet from the surface, such first-aid supplies may be maintained on the surface at the entrance to the mine; and

(3) At a point in each working section not more than 500 feet outby the active working face or faces.

(b) The first-aid equipment required to be maintained under the provisions of paragraph (a) of this § 75.1713-7 shall include at least the following:

(1) One stretcher;

(2) One broken-back board. (If a splint stretcher combination is used it will satisfy the requirements of both (1) and (2)).

(3) 24 triangular bandages (15 if a splint-stretcher combination is used).

(4) Eight 4-inch bandage compresses;

(5) Eight 2-inch bandage compresses.

(6) Twelve 1-inch adhesive compresses;

(7) One foille;

(8) Two cloth blankets:

(9) One rubber blanket or equivalent substitute.

(10) Two tourniquets;

(11) One 1-ounce bottle of aromatic spirits of ammonia or 1 dozen ammonia ampules.

(12) The necessary complements of arm and leg splints or two each inflatable plastic arm and leg splints.

(c) All first-aid supplies required to be maintained under the provisions of paragraphs (a) and (b) of this § 75.1713-7 shall be stored in suitable, sanitary, dust tight, moisture proof containers and such supplies shall be accessible to the miners.

§ 75.1714 Availability of approved self-rescue devices; instruction in use and location.

(a) Each operator shall make available to each miner who goes underground, and to visitors authorized to enter the mine by the operator, an approved self-rescue device or devices which is adequate to protect such person for 1 hour or longer.

(b) Before any person authorized by the operator goes underground, the operator shall instruct and train such person in accordance with provisions set forth in 30 CFR part 48.

[43 FR 54246, Nov. 21, 1978, as amended at 53 FR 10336, Mar. 30, 1988; 60 FR 30401, June 8, 1995; 71 FR 71454, Dec. 8, 2006]

§ 75.1714-1 Approved self-rescue devices.

The requirements of § 75.1714 shall be met by making available to each person referred to in that section a self-rescue device or devices, which have been approved by MSHA and NIOSH under 42 CFR part 84, as follows:

(a) A 1-hour SCSR;

(b) A SCSR of not less than 10 minutes and a 1-hour canister; or

(c) Any other self-contained breathing apparatus which provides protection for a period of 1 hour or longer and which is approved for use by MSHA as a self-rescue device when used and maintained as prescribed by MSHA.

[60 FR 30401, June 8, 1995]

§ 75.1714-2 Self-rescue devices; use and location requirements.

(a) Self-rescue devices shall be used and located as prescribed in paragraphs (b) through (f) of this section.

(b) Except as provided in paragraph (c), (d), (e), or (f) of this section, self-rescue devices shall be worn or carried at all times by each person when underground.

(c) Where the wearing or carrying of the self-rescue device is hazardous to the person, it shall be placed in a readily accessible location no greater than 25 feet from such person.

(d) Where a person works on or around equipment, the self-rescue device may be placed in a readily accessible location on such equipment.

(e) A mine operator may apply to the District Manager under § 75.1502 for permission to place the SCSR more than 25 feet away.

(1) The District Manager shall consider the following factors in deciding whether to permit an operator to place a SCSR more than 25 feet from a miner:

(i) Distance from affected sections to surface,

(ii) Pitch of seam in affected sections,

(iii) Height of coal seam in affected sections,

(iv) Location of escapeways,

(v) Proposed location of SCSRs,

(vi) Type of work performed by affected miners,

(vii) Degree of risk to which affected miners are exposed,

(viii) Potential for breaking into oxygen deficient atmospheres,

(ix) Type of risk to which affected miners are exposed,

(x) Accident history of mine, and

(xi) Other matters bearing upon the safety of miners.

(2) Such application shall not be approved by the District Manager unless it provides that, while underground, all miners whose SCSR is more than 25 feet away shall have a FSR approved by MSHA and NIOSH under 42 CFR part 84 sufficient to enable each miner to get to a SCSR.

(3) An operator may not obtain permission under paragraph (e) of this section to place SCSRs more than 25 feet away from miners on trips into and out of the mine.

(f) If an SCSR is not carried out of the mine at the end of a miner's shift, the place of storage shall be approved by the District Manager. A sign made of reflective material with the word “SCSRs” or “SELF-RESCUERS” shall be conspicuously posted at each SCSR storage location. Direction signs made of a reflective material shall be posted leading to each storage location.

(g) Where devices of not less than 10 minutes and 1 hour are made available in accordance with § 75.1714-1(b), such devices shall be used and located as follows:

(1) Except as provided in paragraphs (c) and (d) of this section, the device of not less than 10 minutes shall be worn or carried at all times by each person when underground, and

(2) The one-hour canister shall be available at all times to all persons when underground in accordance with a plan submitted by the mine operator and approved by the District Manager. When the one-hour canister is placed in a storage location, a sign made of a reflective material with the word “SCSRs” or “SELF-RESCUERS” shall be conspicuously posted at each storage location. Direction signs made of a reflective material shall be posted leading to each storage location.

[43 FR 54246, Nov. 21, 1978, as amended at 60 FR 30401, June 8, 1995; 69 FR 8108, Feb. 23, 2004; 71 FR 12270, Mar. 9, 2006; 71 FR 71454, Dec. 8, 2006]

§ 75.1714-3 Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

(a) Each operator shall provide for proper inspection, testing, maintenance, and repair of self-rescue devices by a person trained to perform such functions.

(b) After each time a self-rescue device is worn or carried by a person, the device shall be inspected for damage and for the integrity of its seal by a person trained to perform this function. Self-rescue devices with broken seals or which are damaged so that the device will not function properly shall be removed from service.

(c) All FSRs approved by MSHA and NIOSH under 42 CFR part 84, except devices using vacuum containers as the only method of sealing, shall be tested at intervals not exceeding 90 days by weighing each device on a scale or balance accurate to within + 1 gram. A device that weighs more than 10 grams over its original weight shall be removed from service.

(d) All SCSRs approved by MSHA and NIOSH under 42 CFR part 84 shall be tested in accordance with instructions approved by MSHA and NIOSH. Any device which does not meet the specified test requirements shall be removed from service.

(e) At the completion of each test required by paragraphs (c) and (d) of this section the person making the tests shall certify by signature and date that the tests were done. This person shall make a record of all corrective action taken. Certifications and records shall be kept at the mine and made available on request to an authorized representative of the Secretary.

(f) Self-rescue devices removed from service shall be repaired for return to service only by a person trained to perform such work and only in accordance with the manufacturer's instructions.

[43 FR 54246, Nov. 21, 1978, as amended at 47 FR 14706, Apr. 6, 1982; 56 FR 1478, Jan. 14, 1991; 60 FR 30402, June 8, 1995; 60 FR 33723, June 29, 1995]

§ 75.1714-4 Additional self-contained self-rescuers (SCSRs).

(a) Additional SCSRs in work places. In addition to the requirements in §§ 75.1714, 75.1714-1, 75.1714-2, and 75.1714-3 of this part, the mine operator shall provide the following:

(1) At least one additional SCSR, which provides protection for a period of one hour or longer, for each person at a fixed underground work location.

(2) Additional SCSRs along the normal travel routes for pumpers, examiners, and other persons who do not have a fixed work location to be stored at a distance an average miner could walk in 30 minutes. The SCSR storage locations shall be determined by using one of the methods found under paragraph (c)(2) of this section.

(b) Additional SCSRs on mantrips. If a mantrip or mobile equipment is used to enter or exit the mine, at least one additional SCSR, which provides protection for a period of one hour or longer, shall be available for each person who uses such transportation from portal to portal.

(c) Additional SCSRs in escapeways. When each person underground cannot safely evacuate the mine within 30 minutes, the mine operator shall provide additional SCSRs stored in each required escapeway.

(1) Each storage location shall contain at least one SCSR, which provides protection for a period of one hour or longer, for every person who will be inby that location.

(2) Storage locations shall be spaced along each escapeway at 30-minute travel distances no greater than the distances determined by—

(i) Calculating the distance an average miner walks in 30 minutes by using the time necessary for each miner in a sample of typical miners to walk a typical length of each escapeway; or

(ii) Using the SCSR storage location spacing specified in the following table, except for escapeways with grades over 5 percent.

Average entry height | Maximum distance between SCSR storage locations (in ft.)

<40 in. (Crawl) | 2,200

>40-<50 in. (Duck Walk) | 3,300

>50-<65 in. (Walk Head Bent) | 4,400

>65 in. (Walk Erect) | 5,700

(d) Additional SCSRs in hardened rooms. As an alternative to providing SCSR storage locations in each escapeway, the mine operator may store SCSRs in a hardened room located between adjacent escapeways.

(1) The hardened room shall be designed and constructed to the same explosion force criteria as seals.

(2) The hardened room shall include a means to provide independent, positive pressure ventilation from the surface during an emergency.

(3) The District Manager shall approve the design and construction of hardened rooms in the ventilation plan.

(4) These SCSR storage locations shall be spaced in accordance with paragraph (c) of this section.

(e) Storage location accessibility. All SCSRs required under this section shall be stored according to the manufacturers' instructions, in conspicuous locations readily accessible by each person in the mine.

(f) Storage location signs. A sign made of reflective material with the words “SCSRs” or “SELF-RESCUERS” shall be conspicuously posted at each storage location. Direction signs made of a reflective material shall be posted leading to each storage location.

[71 FR 71454, Dec. 8, 2006]

§ 75.1714-5 Map locations of self-contained self-rescuers (SCSR).

The mine operator shall indicate the locations of all stored SCSRs on the mine maps required by §§ 75.1200 and 75.1505 of this part.

[71 FR 71454, Dec. 8, 2006]

§ 75.1714-6 Emergency tethers.

At least one tether, which is a durable rope or equivalent material designed to permit members of a mine crew to link together while evacuating the mine during an emergency, shall be provided and stored with the additional SCSRs on the fixed work location and on the mobile equipment required in §§ 75.1714-4(a)(1) and (b) of this part.

[71 FR 71454, Dec. 8, 2006]

§ 75.1714-7 Multi-gas detectors.

(a) Availability. A mine operator shall provide an MSHA-approved, handheld, multi-gas detector that can measure methane, oxygen, and carbon monoxide to each group of underground miners and to each person who works alone, such as pumpers, examiners, and outby miners.

(b) Qualified person. At least one person in each group of underground miners shall be a qualified person under § 75.150 of this part and each person who works alone shall be trained to use the multi-gas detector.

(c) Maintenance and calibration. Multi-gas detectors shall be maintained and calibrated as specified in § 75.320 of this part.

[71 FR 71454, Dec. 8, 2006]

§ 75.1714-8 Reporting SCSR inventory and malfunctions; retention of SCSRs.

(a) SCSR inventory. A mine operator shall submit to MSHA a complete inventory of all SCSRs at each mine. New mines shall submit the inventory within 3 months of beginning operation.

(1) The inventory shall include—

(i) Mine name, MSHA mine ID number, and mine location; and

(ii) For each SCSR unit, the manufacturer, the model type, the date of manufacture, and the serial number.

(2) In the event that a change in the inventory occurs, a mine operator shall report the change to MSHA within the quarter that the change occurs (Jan-Mar, Apr-Jun, Jul-Sep, Oct-Dec).

(b) Reporting SCSR problems. A mine operator shall report to MSHA any defect, performance problem, or malfunction with the use of an SCSR. The report shall include a detailed description of the problem and, for each SCSR involved, the information required by paragraph (a)(1) of this section.

(c) Retention of problem SCSRs. The mine operator shall preserve and retain each SCSR reported under paragraph (b) of this section for 60 days after reporting the problem to MSHA.

[71 FR 71454, Dec. 8, 2006]

§ 75.1715 Identification check system.

[Statutory Provisions]

Each operator of a coal mine shall establish a check-in and check-out system which will provide positive identification of every person underground, and will provide an accurate record of the persons in the mine kept on the surface in a place chosen to minimize the danger of destruction by fire or other hazard. Such record shall bear a number identical to an identification check that is securely fastened to the lamp belt worn by the person underground. The identification check shall be made of a rust resistant metal of not less than 16 gauge.

§ 75.1716 Operations under water.

[Statutory Provisions]

Whenever an operator mines coal from a coal mine opened after March 30, 1970, or from any new working section of a mine opened prior to such date, in a manner that requires the construction, operation, and maintenance of tunnels under any river, stream, lake, or other body of water, that is, in the judgment of the Secretary, sufficiently large to constitute a hazard to miners, such operator shall obtain a permit from the Secretary which shall include such terms and conditions as he deems appropriate to protect the safety of miners working or passing through such tunnels from caveins and other hazards. Such permits shall require, in accordance with a plan to be approved by the Secretary, that a safety zone be established beneath and adjacent to such body of water. No plan shall be approved unless there is a minimum of cover to be determined by the Secretary, based on test holes drilled by the operator in a manner to be prescribed by the Secretary. No such permit shall be required in the case of any new working section of a mine which is located under any water resource reservoir being constructed by a Federal agency on December 30, 1969, the operator of which is required by such agency to operate in a manner that protects the safety of miners working in such section from cave-ins and other hazards.

[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]

§ 75.1716-1 Operations under water; notification by operator.

An operator planning to mine coal from coal mines opened after March 30, 1970, or from working sections in mines opened prior to such date, and in such manner that mining operations will be conducted, or tunnels constructed, under any river, stream, lake, or other body of water, shall give notice to the Coal Mine Safety District Manager in the district in which the mine is located prior to the commencement of such mining operations.

§ 75.1716-2 Permit required.

If in the judgment of the Coal Mine Safety District Manager the proposed mining operations referred to in § 75.1716-1 constitute a hazard to miners, he shall promptly so notify the operator that a permit is required.

§ 75.1716-3 Applications for permits.

An application for a permit required under this section shall be filed with the Coal Mine Safety District Manager and shall contain the following general information:

(a) Name and address of the company.

(b) Name and address of the mine.

(c) Projected mining and ground support plans.

(d) A mine map showing the locations of the river, stream, lake, or other body of water and its relation to the location of all working places.

(e) A profile map showing the type of strata and the distance in elevation between the coal bed and the river, stream, lake or other body of water involved. The type of strata shall be determined by core test drill holes as prescribed by the Coal Mine Safety District Manager.

§ 75.1716-4 Issuance of permits.

If the Coal Mine Safety District Manager determines that the proposed mining operations under water can be safely conducted, he shall issue a permit for the conduct of such operations under such conditions as he deems necessary to protect the safety of miners engaged in those operations.

§ 75.1717 Exemptions.

[Statutory Provisions]

No notice under § 75.1716-1 and no permit under § 75.1716-2 shall be required in the case of any new working section of a mine which is located under any water resource reservoir being constructed by a Federal agency as of December 30, 1969, and where the operator is required by such agency to operate in a manner that adequately protects the safety of miners.

§ 75.1718 Drinking water.

[Statutory Provisions]

An adequate supply of potable water shall be provided for drinking purposes in the active workings of the mine, and such water shall be carried, stored, and otherwise protected in sanitary containers.

§ 75.1718-1 Drinking water; quality.

(a) Potable water provided in accordance with the provisions of § 75.1718 shall meet the applicable minimum health requirements for drinking water established by the State or community in which the mine is located.

(b) Where no state or local health requirements apply to drinking water or where no state or local minimum health requirements exist, drinking water provided in accordance with the provisions of § 75.1718 shall contain a minimum of 0.2 milligrams of free chlorine per liter of water.

§ 75.1719 Illumination; purpose and scope of §§ 75.1719 through 75.1719-4; time for compliance.

(a) Section 317(e) of the Act (30 U.S.C. 877(e)) directs and authorizes the Secretary to propose and promulgate standards under which all working places in a mine shall be illuminated by permissible lighting while persons are working in such places §§ 75.1719 through 75.1719-4 prescribe the requirements for illumination of working places in underground coal mines while persons are working in such places and while self-propelled mining equipment is operated in the working place.

(b) Mine operators shall comply with §§ 75.1719 through 75.1719-4 not later than July 1, 1978.

[41 FR 43534, Oct. 1, 1976, as amended at 43 FR 13564, Mar. 31, 1978]

§ 75.1719-1 Illumination in working places.

(a) Each operator of an underground coal mine shall provide each working place in the mine with lighting as prescribed in §§ 75.1719-1 and 75.1719-2 while self-propelled mining equipment is operated in the working place.

(b) Self-propelled mining equipment; definition. For the purposes of §§ 75.1719 through 75.1719-4, “self-propelled mining equipment” means equipment which possesses the capability of moving itself or its associated components from one location to another by electric, hydraulic, pneumatic, or mechanical power supplied by a source located on the machine or transmitted to the machine by cables, ropes, or chains.

(c) The lighting prescribed in this section shall be in addition to that provided by personal cap lamps.

(d) The luminous intensity (surface brightness) of surfaces that are in a miner's normal field of vision of areas in working places that are required to be lighted shall be not less than 0.06 footlamberts when measured in accordance with § 75.1719-3.

(e) When self-propelled mining equipment specified in paragraphs (e)(1) through (e)(6) of this section is operated in a working place, the areas within a miner's normal field of vision which shall be illuminated in the working place shall be as prescribed in paragraphs (e)(1) through (e)(6) of this section.

(1) Continuous miners and coal-loading equipment. In working places in which continuous miners and coal-loading equipment are operated, the areas which shall be illuminated shall be as follows:

(i) The face, and

(ii) The ribs, roof, floor, and exposed surface of mining equipment, which are between the face and the inby end of the shuttle car or other conveying equipment while in position to receive material.

(2) Self-loading haulage equipment used as a loading machine. In working places in which self-loading haulage equipment is operated to load material, the areas which shall be illuminated shall be as follows:

(i) The face, and

(ii) The ribs, roof, floor, and exposed surfaces of mining equipment, which are between the face and a point 5 feet outby the machine.

(3) Cutting and drilling equipment. In working places in which cutting or drilling equipment is operated, the areas which shall be illuminated shall be as follows:

(i) The ribs, roof, floor, and exposed surfaces of mining equipment, which are between the face and a point 5 feet outby the machine.

(4) Shortwall and longwall mining equipment. In working places in which shortwall or longwall mining equipment is operated, the areas which shall be illuminated shall be as follows:

(i) The area for the length of the self-advancing roof support system and which is between the gob-side of the travelway and the side of the block of coal from which coal is being extracted, and

(ii) The control station, and the head piece and tail piece of the face conveyor, and

(iii) The roof and floor for a distance of 5 feet horizontally from the control station, head piece and tail piece.

(5) Roof bolting equipment. In working places in which roof bolting equipment is operated, the areas which shall be illuminated shall be as follows:

(i) Where the distance from the floor, to the roof is 5 feet, or less: the face, ribs, roof, floor, and exposed surfaces of mining equipment, which are within an area the perimeter of which is a distance of 5 feet from the machine, when measured parallel to the floor.

(ii) Where the distance from the floor to the roof is more than 5 feet: the face, ribs, roof, floor, and exposed surfaces of mining equipment, which are within an area the perimeter of which from the front and sides of the machine is a distance equal to the distance from the floor to the roof and from the rear of the machine a distance of 5 feet, when measured parallel to the floor.

(6) Other self-propelled equipment. Unless the entire working place is illuminated by stationary lighting equipment, in working places in which self-propelled equipment is operated, other than equipment specified in paragraphs (e)(1) through (e)(5) of this section, illumination shall be provided as follows:

(i) Luminaires shall be installed on each machine operated in the working place which shall illuminate a face or rib coal surface which is within 10 feet of the front and the rear of the machine to a luminous intensity of not less than 0.06 footlamberts, and

(ii) The height and width of the area of the coal surface which shall be illuminated shall equal the height and width, respectively, of the machine on which the luminaires are installed, and

(iii) The luminaires in the direction of travel shall be operated at all times the equipment is being trammed in the working place.

(f) The Administrator, Coal Mine Health and Safety, MSHA, may specify other areas in a working place to be illuminated for the protection of miners while self-propelled mining equipment is being operated in the working place.

(g) Surface brightness of floor, roof, coal and machine surfaces in the normal visual field of a miner shall not vary more than 50 percent between adjacent fields of similar surface reflectance, and the maximum surface brightness of such surface shall not exceed 120 footlamberts when measured in accordance with § 75.1719-3.

[41 FR 43534, Oct. 1, 1976, as amended at 42 FR 18859, Apr. 11, 1977; 43 FR 43458, Sept. 26, 1978; 47 FR 28096, June 29, 1982]

§ 75.1719-2 Lighting fixtures; requirements.

(a) Lighting fixtures shall be permissible.

(b) Lighting fixtures may be installed on self-propelled machines or may be stationary lighting fixtures.

(c)(1) Electrically operated lighting fixtures shall be energized by direct current, or by sinusoidal full wave alternating current not less than 50 cycles per second (100 pulses per second), or by an equivalent power source that causes no greater flicker.

(2) Alternating current circuits supplying power to stationary lighting fixtures shall contain conductors energized at voltages not greater than 70 volts to ground. Alternating current circuits, energized at 100 volts or more and used to supply power to stationary lighting fixtures, shall originate at a transformer having a center or neutral tap grounded to earth through a proper resistor, which shall be designed to limit fault current to not more than 5 amperes. A grounding circuit in accordance with § 75.701-4 shall originate at the grounded terminal of the grounding resistor and extend along with the power conductors and serve as a grounding conductor for the frames of all equipment receiving power from the circuit. The ground fault current rating of grounding resistors shall meet the “extended time rating” set forth in the Institute of Electrical and Electronics Engineers, Inc. Standard No. 32 (IEEE Std. 32-1972) which is hereby incorporated by reference and made a part hereof. The incorporated publication is available for examination at each MSHA Coal Mine Safety and Health district office, and may be obtained from the Institute of Electrical and Electronics Engineers, Inc., Publications Office, 10662 Los Vaqueros Circle, P.O. Box 3014 Los Alamitos, CA 90720-1264 Telephone: 800-272-6657 (toll free); http://www.ieee.org.

(3) Machine-mounted lighting fixtures shall be electrically grounded to the machine by a separate grounding conductor in compliance with § 75.701-4.

(d) Direct current circuits in excess of a nominal voltage of 300 volts shall not be used to supply power to stationary light fixtures.

(e) Cables conducting power to stationary lighting fixtures from both alternating and direct current power sources, other than intrinsically safe devices, shall be considered trailing cables, and shall meet the requirements of Subpart G of this part. In addition, such cables shall be protected against overloads and short circuits by a suitable circuit breaker or other device approved by the Secretary. Circuit breakers or other device approved by the Secretary protecting trailing cables receiving power from resistance grounded circuits shall be equipped with a ground trip arrangement which shall be designed to deenergize the circuit at not more than 50% of the available fault current.

(f) Before shunts are removed from blasting caps, lighting fixtures and associated cables located in the same working place shall be deenergized. Furthermore, lighting fixtures shall be removed out of the line of blast and not less than 50 feet from the blasting operation unless otherwise protected against flying debris.

(g) Lighting fixtures shall be designed and installed to minimize discomfort glare.

[41 FR 43534, Oct. 1, 1976, as amended at 71 FR 16669, Apr. 3, 2006]

§ 75.1719-3 Methods of measurement; light measuring instruments.

(a) Compliance with § 75.1719-1(d) shall be determined by MSHA by measuring luminous intensity (surface brightness).

(b) In measuring luminous intensity the following procedures shall be used:

(1) In areas of working places specified in §§ 75.1719.1(e)(1) through 75.1719-1(e)(3) luminous intensity measurements of the face, ribs, roof, floor, and exposed surfaces of mining equipment, shall be made with the machine idle and located in the approximate center of the working place with the cutting, loading, or drilling head toward the face and not more than 3 feet from the face.

(2) In areas of working places specified in § 75.1719-1(e)(4) luminous intensity measurements may be made at any time longwall or shortwall mining equipment is operated except that when measurements are made in the vicinity of shearers, plows, or continuous miners, the equipment shall be idle while measurements are being made.

(3) In areas of working places specified in § 75.1719-1(e)(5) luminous intensity measurements of the face, ribs, roof, floor, and exposed surfaces of mining equipment, shall be made with the machine idle and located in the approximate center of the working place with the drilling head toward the face and a distance from the face of 5 feet, or the distance from the floor to the roof, whichever is applicable. When the machine is located in the center of the working place and the surfaces of the ribs to be illuminated are not within the perimeter of the area determined in accordance with § 75.1719-1(e)(5), the machine shall be positioned the applicable distance from the face and each rib and luminous intensity measurements made for each rib, provided, however, that luminous intensity measurements may be made of the face, roof, floor, and exposed surfaces of mining equipment with the machine so located without locating the machine in the center of the working place.

(4) In areas of working places specified in § 75.1719-1(e)(6), luminous intensity measurements of a coal surface shall be made with the machine idle and located in the approximate center of the working place with the appropriate end toward the face and not less than 9 feet nor more than 10 feet from the face.

(5) The area of surfaces to be measured shall be divided into round or square fields having an area of not less than 3 nor more than 5 square feet as illustrated by the following figure:

(6) Measurements shall be taken with the photometer held approximately perpendicular to the surface being measured and a sufficient distance from the surface to allow the light sensing element in the instrument to receive reflected light from a field of not less than 3 nor more than 5 square feet. The luminous intensity of each such field shall be not less than 0.06 footlambert.

(7) In areas of working places where clearances are restricted to the extent that the photometer cannot be held a sufficient distance from the surface to allow the light sensing element in the instrument to receive reflected light from a field having an area of at least 3 square feet, luminous intensity shall be considered as the average of four uniformly spaced readings taken at the corners and within a square field having an area of approximately 4 square feet. In such instances, the area of each of the individual readings shall not exceed 100 square inches. The average of the four readings shall be not less than 0.06 footlambert. The method of measurement is illustrated by the following figure:

(8) Measurements shall not be made where shadows are cast by roof control posts, ventilation equipment, or other obstructions necessary to insure safe mining conditions.

(9) Where machine-mounted light fixtures are used on equipment, except self advancing roof support systems, measurements shall not be made of surfaces on or within 1 foot of a self-propelled machine.

(c) For the purpose of making illumination measurements, an authorized representative of the Secretary may require the installation of temporary roof supports or the removal of the equipment to a similar working place in which permanent roof supports have been installed.

(d) Light measuring instruments shall be properly calibrated and maintained. Instruments shall be calibrated against standards traceable to the National Institute of Standards and Technology (Formerly the National Bureau of Standards) and color corrected to the Commission Internationale de l'Eclairage (CIE) Spectral Luminous Curve. The CIE Spectral Luminous Curve is as follows:

[41 FR 43534, Oct. 1, 1976, as amended at 71 FR 16669, Apr. 3, 2006]

§ 75.1719-4 Mining machines, cap lamps; requirements.

(a) Paint used on exterior surfaces of mining machines shall have a minimum reflectance of 30 percent, except cab interiors and other surfaces which might adversely affect visibility.

(b) When stationary light fixtures are used, red reflectors mounted in protective frames or reflecting tape shall be installed on each end of mining machines, except that continuous mining machines, loaders, and cutters need only have such reflectors or tape on the outby end. Reflectors or reflecting tape shall have an area of not less than 10 square inches.

(c) Each person who goes underground shall be required to wear an approved personal cap lamp or an equivalent portable light.

(d) Each person who goes underground shall be required to wear a hard hat or hard cap which shall have a minimum of 6 square inches of reflecting tape or equivalent paint or material on each side and back.

[41 FR 43534, Oct. 1, 1976]

§ 75.1720 Protective clothing; requirements.

On and after the effective date of this § 75.1720 each miner regularly employed in the active workings of an underground coal mine shall be required to wear the following protective clothing and devices:

(a) Protective clothing or equipment and face-shields or goggles when welding, cutting, or working with molten metal or when other hazards to the eyes exist from flying particles.

(b) Suitable protective clothing to cover those parts of the body exposed to injury when handling corrosive or toxic substances or other materials which might cause injury to the skin.

(c) Protective gloves when handling materials or performing work which might cause injury to the hands; however, gloves shall not be worn where they would create a greater hazard by becoming entangled in the moving parts of equipment.

(d) A suitable hard hat or hard cap. If a hard hat or hard cap is painted, nonmetallic based paint shall be used.

(e) Suitable protective footwear.

[36 FR 19497, Oct. 7, 1971, as amended at 39 FR 7175, Feb. 25, 1974]

§ 75.1720-1 Distinctively colored hard hats, or hard caps; identification for newly employed, inexperienced miners.

Hard hats or hard caps distinctively different in color from those worn by experienced miners shall be worn by each newly employed, inexperienced miner for at least one year from the date of his initial employment as a miner or until he has been qualified or certified as a miner by the State in which he is employed.

[39 FR 7175, Feb. 25, 1974]

§ 75.1721 Opening of new underground coal mines, or reopening and reactivating of abandoned or deactivated coal mines, notification by the operator; requirements.

(a) Each operator of a new underground coal mine, and a mine which has been abandoned or deactivated and is to be reopened or reactivated, shall prior to opening, reopening or reactivating the mine notify the Coal Mine Health and Safety District Manager for the district in which the mine is located of the approximate date of the proposed or actual opening of such mine. Thereafter, and as soon as practicable, the operator of such mine shall submit all preliminary plans in accordance with paragraphs (b) and (c) of this section to the District Manager and the operator shall not develop any part of the coalbed in such mine unless and until all preliminary plans have been approved.

(b) The preliminary plans required to be submitted by the operator to the District Manager shall be in writing and shall contain the following:

(1) The name and location of the proposed mine and the Mine Safety and Health Administration mine identification number, if known;

(2) The name and address of the mine operator(s);

(3) The name and address of the principal official designated by the operator as the person who is in charge of health and safety at the mine;

(4) The identification and approximate height of the coalbed to be developed;

(5) The system of mining to be employed;

(6) A proposed roof control plan containing the information specified in § 75.220.

(7) A proposed mine ventilation plan containing the information specified in §§ 75.371 and 75.372;

(8) A proposed plan for sealing worked-out areas containing the information specified in §§ 75.371 and 75.372.

(9) A proposed program for searching miners for smoking materials in accordance with the provisions of § 75.1702; and,

(10) A proposed plan for emergency medical assistance and emergency communication in accordance with the provisions of §§ 75.1713-1 and 75.1713-2.

(c) The preliminary plans required to be submitted by the operator to the District Manager shall be in writing and shall contain the following:

(1) The proposed training plan containing the information specified in §§ 48.3 and 48.23 of this chapter, and

(2) A proposed plan for training and retraining certified and qualified persons containing the information specified in § 75.160-1.

[44 FR 9380, Feb. 13, 1979, as amended at 47 FR 23641, May 28, 1982; 57 FR 20929, May 15, 1992]

§ 75.1722 Mechanical equipment guards.

(a) Gears; sprockets; chains; drive, head, tail, and takeup pulleys; flywheels; couplings, shafts; sawblades; fan inlets; and similar exposed moving machine parts which may be contacted by persons, and which may cause injury to persons shall be guarded.

(b) Guards at conveyor-drive, conveyor-head, and conveyor-tail pulleys shall extend a distance sufficient to prevent a person from reaching behind the guard and becoming caught between the belt and the pulley.

(c) Except when testing the machinery, guards shall be securely in place while machinery is being operated.

[38 FR 4976, Feb. 23, 1973]

§ 75.1723 Stationary grinding machines; protective devices.

(a) Stationary grinding machines other than special bit grinders shall be equipped with:

(1) Peripheral hoods (less than 90° throat openings) capable of withstanding the force of a bursting wheel.

(2) Adjustable tool rests set as close as practical to the wheel.

(3) Safety washers.

(b) Grinding wheels shall be operated within the specifications of the manufacturer of the wheel.

(c) Face shields or goggles, in good condition, shall be worn when operating a grinding wheel.

[38 FR 4976, Feb. 23, 1973]

§ 75.1724 Hand-held power tools; safety devices.

Hand-held power tools shall be equipped with controls requiring constant hand or finger pressure to operate the tools or shall be equipped with friction or other equivalent safety devices.

[38 FR 4976, Feb. 23, 1973]

§ 75.1725 Machinery and equipment; operation and maintenance.

(a) Mobile and stationary machinery and equipment shall be maintained in safe operating condition and machinery or equipment in unsafe condition shall be removed from service immediately.

(b) Machinery and equipment shall be operated only by persons authorized to operate such machinery or equipment.

(c) Repairs or maintenance shall not be performed on machinery until the power is off and the machinery is blocked against motion, except where machinery motion is necessary to make adjustments.

(d) Machinery shall not be lubricated manually while in motion, unless equipped with extended fittings or cups.

[38 FR 4976, Feb. 23, 1973]

§ 75.1726 Performing work from a raised position; safeguards.

(a) Men shall not work on or from a piece of mobile equipment in a raised position until it has been blocked in place securely. This does not preclude the use of equipment specifically designed as elevated mobile work platforms.

(b) No work shall be performed under machinery or equipment that has been raised until such machinery or equipment has been securely blocked in position.

[38 FR 4976, Feb. 23, 1973]

§ 75.1727 Drive belts.

(a) Drive belts shall not be shifted while in motion unless the machines are provided with mechanical shifters.

(b) Belt dressing shall not be applied while belts are in motion except where it can be applied without endangering a person.

[38 FR 4976, Feb. 23, 1973]

§ 75.1728 Power-driven pulleys.

(a) Belts, chains, and ropes shall not be guided onto power-driven moving pulleys, sprockets, or drums with the hands except on slow-moving equipment especially designed for hand feeding.

(b) Pulleys of conveyors shall not be cleaned manually while the conveyor is in motion.

(c) Coal spilled beneath belt conveyor drives or tail pieces shall not be removed while the conveyor is in motion, except where such coal can be removed without endangering persons.

[38 FR 4976, Feb. 23, 1973]

§ 75.1729 Welding operations.

Welding operations shall be shielded and the area shall be well ventilated.

[38 FR 4976, Feb. 23, 1973]

§ 75.1730 Compressed air; general; compressed air systems.

(a) All pressure vessels shall be constructed, installed, and maintained in accordance with the standards and specifications of Section VIII “Unfired Pressure Vessels,” of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (1971), which is hereby incorporated by reference and made a part hereof. This document may be purchased from the American Society of Mechanical Engineers, 22 Law Drive, P.O. Box 2900, Fairfield, New Jersey 07007, Phone: 800-843-2763 (toll free); http://www.asme.org; and it is available for examination in every MSHA Coal Mine Safety and Health district office.

(b) Compressors and compressed-air receivers shall be equipped with automatic pressure-relief valves, pressure gages, and drain valves.

(c) Repairs involving the pressure system of compressors, receivers, or compressed-air-powered equipment shall not be attempted until the pressure has been relieved from that part of the system to be repaired.

(d) At no time shall compressed air be directed toward a person. When compressed air is used, all necessary precautions shall be taken to protect persons from injury.

(e) Safety chains, suitable locking devices, or automatic cut-off valves shall be used at connections to machines of high-pressure hose lines of three-fourths of an inch inside diameter or larger, and between high-pressure hose lines of three-fourths of an inch inside diameter or larger, where a connection failure would create a hazard. For purposes of this paragraph, high-pressure means pressure of 100 p.s.i. or more.

[38 FR 4976, Feb. 23, 1973, as amended at 71 FR 16669, Apr. 3, 2006]

§ 75.1731 Maintenance of belt conveyors and belt conveyor entries.

(a) Damaged rollers, or other damaged belt conveyor components, which pose a fire hazard must be immediately repaired or replaced. All other damaged rollers, or other damaged belt conveyor components, must be repaired or replaced.

(b) Conveyor belts must be properly aligned to prevent the moving belt from rubbing against the structure or components.

(c) Materials shall not be allowed in the belt conveyor entry where the material may contribute to a frictional heating hazard.

(d) Splicing of any approved conveyor belt must maintain flame-resistant properties of the belt.

[73 FR 80616, Dec. 31, 2008]

§ 75.1732 Proximity detection systems.

Operators must install proximity detection systems on certain mobile machines.

(a) Machines covered. Operators must equip continuous mining machines, except full-face continuous mining machines, with proximity detection systems by the following dates. For proximity detection systems with miner-wearable components, the mine operator must provide a miner-wearable component to be worn by each miner on the working section by the following dates.

(1) Continuous mining machines manufactured after March 16, 2015 must meet the requirements in this section no later than November 16, 2015. These machines must meet the requirements in this section when placed in service with a proximity detection system.

(2) Continuous mining machines manufactured and equipped with a proximity detection system on or before March 16, 2015 must meet the requirements in this section no later than September 16, 2016.

(3) Continuous mining machines manufactured and not equipped with a proximity detection system on or before March 16, 2015 must meet the requirements in this section no later than March 16, 2018. These machines must meet the requirements in this section when placed in service with a proximity detection system.

(b) Requirements for a proximity detection system. A proximity detection system includes machine-mounted components and miner-wearable components. The system must:

(1) Cause a machine, which is tramming from place-to-place or repositioning, to stop before contacting a miner except for a miner who is in the on-board operator's compartment;

(2) Provide an audible and visual warning signal on the miner-wearable component and a visual warning signal on the machine that alert miners before the system causes a machine to stop. These warning signals must be distinguishable from other signals;

(3) Provide a visual signal on the machine that indicates the machine-mounted components are functioning properly;

(4) Prevent movement of the machine if any machine-mounted component of the system is not functioning properly. However, a system with any machine-mounted component that is not functioning properly may allow machine movement if it provides an audible or visual warning signal, distinguishable from other signals, during movement. Such movement is permitted only for purposes of relocating the machine from an unsafe location for repair;

(5) Be installed to prevent interference that adversely affects performance of any electrical system; and

(6) Be installed and maintained in proper operating condition by a person trained in the installation and maintenance of the system.

(c) Proximity detection system checks. Operators must:

(1) Designate a person who must perform a check of machine-mounted components of the proximity detection system to verify that components are intact, that the system is functioning properly, and take action to correct defects—

(i) At the beginning of each shift when the machine is to be used; or

(ii) Immediately prior to the time the machine is to be operated if not in use at the beginning of a shift; or

(iii) Within 1 hour of a shift change if the shift change occurs without an interruption in production.

(2) Check for proper operation of miner-wearable components at the beginning of each shift that the components are to be used and correct defects before the components are used.

(d) Certifications and records. The operator must make and retain certifications and records as follows:

(1) At the completion of the check of machine-mounted components required under paragraph (c)(1) of this section, a certified person under § 75.100 must certify by initials, date, and time that the check was conducted. Defects found as a result of the check, including corrective actions and dates of corrective actions, must be recorded before the end of the shift;

(2) Make a record of the defects found as a result of the check of miner-wearable components required under paragraph (c)(2) of this section, including corrective actions and dates of corrective actions;

(3) Make a record of the persons trained in the installation and maintenance of proximity detection systems required under paragraph (b)(6) of this section;

(4) Maintain records in a secure book or electronically in a secure computer system not susceptible to alteration; and

(5) Retain records for at least one year and make them available for inspection by authorized representatives of the Secretary and representatives of miners.

[80 FR 2202, Jan. 15, 2015]

S Subpart S [Reserved]
Subpart T Diesel-Powered Equipment

Source: 61 FR 55527, Oct. 25, 1996, unless otherwise noted.

§ 75.1900 Definitions.

The following definitions apply in this subpart.

Diesel fuel tank. A closed metal vessel specifically designed for the storage or transport of diesel fuel.

Diesel fuel transportation unit. A self-propelled or portable wheeled vehicle used to transport a diesel fuel tank.

Noncombustible material. A material that will continue to serve its intended function for 1 hour when subjected to a fire test incorporating an ASTM E119-88 time/temperature heat input, or equivalent. The publication ASTM E119-88 “Standard Test Methods for Fire Tests of Building Construction and Materials” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office; at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. In addition, copies of the document may be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA, 19428-2959; 610-832-9500; http://www.astm.org.

Permanent underground diesel fuel storage facility. A facility designed and constructed to remain at one location for the storage or dispensing of diesel fuel, which does not move as mining progresses.

Safety can. A metal container intended for storage, transport or dispensing of diesel fuel, with a nominal capacity of 5 gallons, listed or approved by a nationally recognized independent testing laboratory.

Temporary underground diesel fuel storage area. An area of the mine provided for the short-term storage of diesel fuel in a fuel transportation unit, which moves as mining progresses.

[35 FR 17890, Nov. 20, 1970, as amended at 67 FR 38386, June 4, 2002; 71 FR 16669, Apr. 3, 2006; 80 FR 52992, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]

§ 75.1901 Diesel fuel requirements.

(a) Diesel-powered equipment shall be used underground only with a diesel fuel having a sulfur content no greater than 0.05 percent and a flash point of 100 °F (38 °C) or greater. Upon request, the mine operator shall provide to an authorized representative of the Secretary evidence that the diesel fuel purchased for use in diesel-powered equipment underground meets these requirements.

(b) Flammable liquids shall not be added to diesel fuel used in diesel-powered equipment underground.

(c) Only diesel fuel additives that have been registered by the Environmental Protection Agency may be used in diesel-powered equipment underground.

§ 75.1902 Underground diesel fuel storage—general requirements.

(a) All diesel fuel must be stored in:

(1) Diesel fuel tanks in permanent underground diesel fuel storage facilities;

(2) Diesel fuel tanks on diesel fuel transportation units in permanent underground diesel fuel storage facilities or in temporary underground fuel storage areas; or

(3) Safety cans.

(b) The total capacity of stationary diesel fuel tanks in permanent underground diesel fuel storage facilities must not exceed 1000 gallons.

(c)(1) Only one temporary underground diesel fuel storage area is permitted for each working section or in each area of the mine where equipment is being installed or removed.

(2) The temporary underground diesel fuel storage area must be located—

(i) Within 500 feet of the loading point;

(ii) Within 500 feet of the projected loading point where equipment is being installed; or

(iii) Within 500 feet of the last loading point where equipment is being removed.

(3) No more than one diesel fuel transportation unit at a time shall be parked in the temporary underground diesel fuel storage area.

(d) Permanent underground diesel fuel storage facilities and temporary underground diesel fuel storage areas must be—

(1) At least 100 feet from shafts, slopes, shops, or explosives magazines;

(2) At least 25 feet from trolley wires or power cables, or electric equipment not necessary for the operation of the storage facilities or areas; and

(3) In a location that is protected from damage by other mobile equipment.

(e) Permanent underground diesel fuel storage facilities must not be located within the primary escapeway.

§ 75.1903 Underground diesel fuel storage facilities and areas; construction and safety precautions.

(a) Permanent underground diesel fuel storage facilities must be—

(1) Constructed of noncombustible materials, including floors, roofs, roof supports, doors, and door frames. Exposed coal within fuel storage areas must be covered with noncombustible materials. If bulkheads are used they must be tightly sealed and must be built of or covered with noncombustible materials;

(2) Provided with either self-closing doors or a means for automatic enclosure;

(3) Provided with a means for personnel to enter and exit the facility after closure;

(4) Ventilated with intake air that is coursed into a return air course or to the surface and that is not used to ventilate working places, using ventilation controls meeting the requirements of § 75.333(e);

(5) Equipped with an automatic fire suppression system that meets the requirements of § 75.1912. Actuation of the automatic fire suppression system shall initiate the means for automatic enclosure;

(6) Provided with a means of containment capable of holding 150 percent of the maximum capacity of the fuel storage system; and

(7) Provided with a competent concrete floor or equivalent to prevent fuel spills from saturating the mine floor.

(b) Permanent underground diesel fuel storage facilities and temporary underground diesel fuel storage areas must be—

(1) Equipped with at least 240 pounds of rock dust and provided with two portable multipurpose dry chemical type (ABC) fire extinguishers that are listed or approved by a nationally recognized independent testing laboratory and have a 10A:60B:C or higher rating. Both fire extinguishers must be easily accessible to personnel, and at least one fire extinguisher must be located outside of the storage facility or area upwind of the facility, in intake air; or

(2) Provided with three portable multipurpose dry chemical type (ABC) fire extinguishers that are listed or approved by a nationally recognized independent testing laboratory and have a 10A:60B:C or higher rating. All fire extinguishers must be easily accessible to personnel, and at least one fire extinguisher must be located outside of the storage facility or area upwind of the facility, in intake air.

(3) Identified with conspicuous markings designating diesel fuel storage; and

(4) Maintained to prevent the accumulation of water.

(c) Welding or cutting other than that performed in accordance with paragraph (d) of this section shall not be performed within 50 feet of a permanent underground diesel fuel storage facility or a temporary underground diesel fuel storage area.

(d) When it is necessary to weld, cut, or solder pipelines, tanks, or other containers that may have contained diesel fuel, these practices shall be followed:

(1) Cutting or welding shall not be performed on or within pipelines, tanks, or other containers that have contained diesel fuel until they have been thoroughly purged and cleaned or inerted and a vent or opening is provided to allow for sufficient release of any buildup pressure before heat is applied.

(2) Diesel fuel shall not be allowed to enter pipelines, tanks, or containers that have been welded, soldered, brazed, or cut until the metal has cooled to ambient temperature.

§ 75.1904 Underground diesel fuel tanks and safety cans.

(a) Diesel fuel tanks used underground shall—

(1) Have steel walls of a minimum 3/16-inch thickness, or walls made of other metal of a thickness that provides equivalent strength;

(2) Be protected from corrosion;

(3) Be of seamless construction or have liquid tight welded seams;

(4) Not leak; and

(5) For stationary tanks in permanent underground diesel fuel storage facilities, be placed on supports constructed of noncombustible material so that the tanks are at least 12 inches above the floor.

(b) Underground diesel fuel tanks must be provided with—

(1) Devices for emergency venting designed to open at a pressure not to exceed 2.5 psi according to the following—

(i) Tanks with a capacity greater than 500 gallons must have an emergency venting device whose area is equivalent to a pipe with a nominal inside diameter of 5 inches or greater; and

(ii) Tanks with a capacity of 500 gallons or less must have an emergency venting device whose area is equivalent to a pipe with a nominal inside diameter of 4 inches or greater.

(2) Tethered or self-closing caps for stationary tanks in permanent underground diesel fuel storage facilities and self-closing caps for diesel fuel tanks on diesel fuel transportation units;

(3) Vents to permit the free discharge of liquid, at least as large as the fill or withdrawal connection, whichever is larger, but not less than 1 1/4 inch nominal inside diameter;

(4) Liquid tight connections for all tank openings that are—

(i) Identified by conspicuous markings that specify the function; and

(ii) Closed when not in use.

(5) Vent pipes that drain toward the tank without sagging and are higher than the fill pipe opening;

(6) Shutoff valves located as close as practicable to the tank shell on each connection through which liquid can normally flow; and

(7) An automatic closing, heat-actuated valve on each withdrawal connection below the liquid level.

(c) When tanks are provided with openings for manual gauging, liquid tight, tethered or self-closing caps or covers must be provided and must be kept closed when not open for gauging.

(d) Surfaces of the tank and its associated components must be protected against damage by collision.

(e) Before being placed in service, tanks and their associated components must be tested for leakage at a pressure equal to the working pressure, except tanks and components connected directly to piping systems, which must be properly designed for the application.

(f) Safety cans must be:

(1) Limited to a nominal capacity of 5 gallons or less;

(2) Equipped with a flexible or rigid tubular nozzle attached to a valved spout;

(3) Provided with a vent valve designed to open and close simultaneously and automatically with the opening and closing of the pouring valve; and

(4) Designed so that they will safely relieve internal pressure when exposed to fire.

§ 75.1905 Dispensing of diesel fuel.

(a) Diesel-powered equipment in underground coal mines may be refueled only from safety cans, from tanks on diesel fuel transportation units, or from stationary tanks.

(b) Fuel that is dispensed from other than safety cans must be dispensed by means of—

(1) Gravity feed with a hose equipped with a nozzle with a self-closing valve and no latch-open device;

(2) A manual pump with a hose equipped with a nozzle containing a self-closing valve; or

(3) A powered pump with:

(i) An accessible emergency shutoff switch for each nozzle;

(ii) A hose equipped with a self-closing valve and no latch-open device; and

(iii) An anti-siphoning device.

(c) Diesel fuel must not be dispensed using compressed gas.

(d) Diesel fuel must not be dispensed to the fuel tank of diesel-powered equipment while the equipment engine is running.

(e) Powered pumps shall be shut off when fuel is not being dispensed.

§ 75.1905-1 Diesel fuel piping systems.

(a) Diesel fuel piping systems from the surface must be designed and operated as dry systems, unless an automatic shutdown is incorporated that prevents accidental loss or spillage of fuel and that activates an alarm system.

(b) All piping, valves and fittings must be—

(1) Capable of withstanding working pressures and stresses;

(2) Capable of withstanding four times the static pressures;

(3) Compatible with diesel fuel; and

(4) Maintained in a manner that prevents leakage.

(c) Pipelines must have manual shutoff valves installed at the surface filling point, and at the underground discharge point.

(d) If diesel fuel lines are not buried in the ground sufficiently to protect them from damage, shutoff valves must be located every 300 feet.

(e) Shutoff valves must be installed at each branch line where the branch line joins the main line.

(f) An automatic means must be provided to prevent unintentional transfer of diesel fuel from the surface into the permanent underground diesel fuel storage facility.

(g) Diesel fuel piping systems from the surface shall only be used to transport diesel fuel directly to stationary tanks or diesel fuel transportation units in a permanent underground diesel fuel storage facility.

(h) The diesel fuel piping system must not be located in a borehole with electric power cables.

(i) Diesel fuel piping systems located in entries must not be located on the same side of the entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near broken fuel lines.

(j) Diesel fuel piping systems must be protected and located to prevent physical damage.

§ 75.1906 Transport of diesel fuel.

(a) Diesel fuel shall be transported only by diesel fuel transportation units or in safety cans.

(b) No more than one safety can shall be transported on a vehicle at any time. The can must be protected from damage during transport. All other safety cans must be stored in permanent underground diesel fuel storage facilities.

(c) Safety cans that leak must be promptly removed from the mine.

(d) Diesel fuel transportation unit tanks and safety cans must be conspicuously marked as containing diesel fuel.

(e) Diesel fuel transportation units must transport no more than 500 gallons of diesel fuel at a time.

(f) Tanks on diesel fuel transportation units must be permanently fixed to the unit and have a total capacity of no greater than 500 gallons of diesel fuel.

(g) Non-self-propelled diesel fuel transportation units with electrical components for dispensing fuel that are connected to a source of electrical power must be protected by a fire suppression device that meets the requirements of §§ 75.1107-3 through 75.1107-6, and §§ 75.1107-8 through 75.1107-16.

(h) Diesel fuel transportation units and vehicles transporting safety cans containing diesel fuel must have at least two multipurpose, dry chemical type (ABC) fire extinguishers, listed or approved by a nationally recognized independent testing laboratory and having a 10A:60B:C or higher rating, with one fire extinguisher provided on each side of the vehicle.

(i) Diesel fuel transportation units shall be parked only in permanent underground diesel fuel storage facilities or temporary underground diesel fuel storage areas when not in use.

(j) When the distance between a diesel fuel transportation unit and an energized trolley wire at any location is less than 12 inches, the requirements of § 75.1003-2 must be followed.

(k) Diesel fuel shall not be transported on or with mantrips or on conveyor belts.

(l) Diesel fuel shall be stored and handled in accordance with the requirements of §§ 75.1902 through 75.1906 of this part as of November 25, 1997.

[61 FR 55527, Oct. 25, 1996, as amended at 63 FR 12647, Mar. 16, 1998]

§ 75.1907 Diesel-powered equipment intended for use in underground coal mines.

(a) As of November 25, 1996 all diesel-powered equipment used where permissible electrical equipment is required must be approved under part 36 of this chapter.

(b) Diesel-powered equipment approved under part 36 of this chapter must be provided with additional safety features in accordance with the following time schedule:

(1) As of April 25, 1997 the equipment must have a safety component system that limits surface temperatures to those specified in subpart F of part 7 of this title;

(2) As of November 25, 1999 the equipment must have an automatic or manual fire suppression system that meets the requirements of § 75.1911 of this part, and at least one portable multipurpose dry chemical type (ABC) fire extinguisher, listed or approved by a nationally recognized independent testing laboratory and having a 10A:60B:C or higher rating. The fire extinguisher must be located within easy reach of the equipment operator and be protected from damage by collision.

(3) As of November 25, 1999 the equipment must have a brake system that meets the requirements of § 75.1909 (b)(6), (b)(7), (b)(8), (c), (d), and (e);

(4) As of November 25, 1997 a particulate index and dilution air quantity shall be determined for the equipment in accordance with subpart E of part 7 of this chapter; and

(5) Permissible diesel-powered equipment manufactured on or after November 25, 1999 and that is used in an underground coal mine shall incorporate a power package approved in accordance with part 7, subpart F of this chapter.

(c) As of November 25, 1999 nonpermissible diesel-powered equipment, except the special category of equipment under § 75.1908(d), shall meet the requirements of §§ 75.1909 and 75.1910 of this part.

§ 75.1908 Nonpermissible diesel-powered equipment; categories.

(a) Heavy-duty diesel-powered equipment includes—

(1) Equipment that cuts or moves rock or coal;

(2) Equipment that performs drilling or bolting functions;

(3) Equipment that moves longwall components;

(4) Self-propelled diesel fuel transportation units and self-propelled lube units; or

(5) Machines used to transport portable diesel fuel transportation units or portable lube units.

(b) Light-duty diesel-powered equipment is any diesel-powered equipment that does not meet the criteria of paragraph (a).

(c) For the purposes of this subpart, the following equipment is considered attended:

(1) Any machine or device operated by a miner; or

(2) Any machine or device that is mounted in the direct line of sight of a job site located within 500 feet of such machine or device, which job site is occupied by a miner.

(d) Diesel-powered ambulances and fire fighting equipment are a special category of equipment that may be used underground only in accordance with the mine fire fighting and evacuation plan under § 75.1502.

[61 FR 55527, Oct. 25, 1996; 70 FR 36347, June 23, 2005]

§ 75.1909 Nonpermissible diesel-powered equipment; design and performance requirements.

(a) Nonpermissible diesel-powered equipment, except for the special category of equipment under § 75.1908(d), must be equipped with the following features:

(1) An engine approved under subpart E of part 7 of this title equipped with an air filter sized in accordance with the engine manufacturer's recommendations, and an air filter service indicator set in accordance with the engine manufacturer's recommendations;

(2) At least one portable multipurpose dry chemical type (ABC) fire extinguisher listed or approved by a nationally recognized independent testing laboratory with a 10A:60B:C or higher rating. The fire extinguisher must be located within easy reach of the equipment operator and protected from damage;

(3) A fuel system specifically designed for diesel fuel meeting the following requirements:

(i) A fuel tank and fuel lines that do not leak;

(ii) A fuel tank that is substantially constructed and protected against damage by collision;

(iii) A vent opening that maintains atmospheric pressure in the fuel tank, and that is designed to prevent fuel from splashing out of the vent opening;

(iv) A self-closing filler cap on the fuel tank;

(v) The fuel tank, filler and vent must be located so that leaks or spillage during refueling will not contact hot surfaces;

(vi) Fuel line piping must be either steel-wire reinforced; synthetic elastomer-covered hose suitable for use with diesel fuel that has been tested and has been determined to be fire-resistant by the manufacturer; or metal;

(vii) Fuel line piping must be clamped;

(viii) Primary fuel lines must be located so that fuel line leaks do not contact hot surfaces;

(ix) The fuel lines must be separated from electrical wiring and protected from damage in ordinary use;

(x) A manual shutoff valve must be installed in the fuel system as close as practicable to the tank; and

(xi) A water separator and fuel filter(s) must be provided.

(4) A sensor to monitor the temperature and provide a visual warning of an overheated cylinder head on air-cooled engines;

(5) Guarding to protect fuel, hydraulic, and electric lines when such lines pass near rotating parts or in the event of shaft failure;

(6) Hydraulic tanks, fillers, vents, and lines located to prevent spillage or leaks from contacting hot surfaces;

(7) Reflectors or warning lights mounted on the equipment which can be readily seen in all directions;

(8) A means to direct exhaust gas away from the equipment operator, persons on board the machine, and combustible machine components;

(9) A means to prevent unintentional free and uncontrolled descent of personnel-elevating work platforms; and

(10) A means to prevent the spray from ruptured hydraulic or lubricating oil lines from being ignited by contact with engine exhaust system component surfaces.

(b) Self-propelled nonpermissible diesel-powered equipment must have the following features in addition to those in paragraph (a):

(1) A means to ensure that no stored hydraulic energy that will cause machine articulation is available after the engine is shut down;

(2) A neutral start feature which ensures that engine cranking torque will not be transmitted through the powertrain and cause machine movement on vehicles utilizing fluid power transmissions;

(3) For machines with steering wheels, brake pedals, and accelerator pedals, controls which are of automobile orientation;

(4) An audible warning device conveniently located near the equipment operator;

(5) Lights provided and maintained on both ends of the equipment. Equipment normally operated in both directions must be equipped with headlights for both directions;

(6) Service brakes that act on each wheel of the vehicle and that are designed such that failure of any single component, except the brake actuation pedal or other similar actuation device, must not result in a complete loss of service braking capability;

(7) Service brakes that safely bring the fully loaded vehicle to a complete stop on the maximum grade on which it is operated; and

(8) No device that traps a column of fluid to hold the brake in the applied position shall be installed in any brake system, unless the trapped column of fluid is released when the equipment operator is no longer in contact with the brake activation device.

(c) Self-propelled nonpermissible heavy-duty diesel-powered equipment under § 75.1908(a), except rail-mounted equipment, shall be provided with a supplemental braking system that:

(1) Engages automatically within 5 seconds of the shutdown of the engine;

(2) Safely brings the equipment when fully loaded to a complete stop on the maximum grade on which it is operated;

(3) Holds the equipment stationary, despite any contraction of brake parts, exhaustion of any nonmechanical source of energy, or leakage;

(4) Releases only by a manual control that does not operate any other equipment function;

(5) Has a means in the equipment operator's compartment to apply the brakes manually without shutting down the engine, and a means to release and reengage the brakes without the engine operating; and

(6) Has a means to ensure that the supplemental braking system is released before the equipment can be trammed, and is designed to ensure the brake is fully released at all times while the equipment is trammed.

(d) Self-propelled nonpermissible light-duty diesel-powered equipment under § 75.1908(b), except rail-mounted equipment, must be provided with a parking brake that holds the fully loaded equipment stationary on the maximum grade on which it is operated despite any contraction of the brake parts, exhaustion of any nonmechanical source of energy, or leakage.

(e) The supplemental and park brake systems required by paragraphs (c) and (d) must be applied when the equipment operator is not at the controls of the equipment, except during movement of disabled equipment.

(f) Self-propelled personnel-elevating work platforms must be provided with a means to ensure that the parking braking system is released before the equipment can be trammed, and must be designed to ensure the brake is fully released at all times while the equipment is trammed.

(g) Any nonpermissible equipment that discharges its exhaust directly into a return air course must be provided with a power package approved under subpart F of part 7 of this title.

(h) Self-propelled nonpermissible heavy-duty diesel-powered equipment meeting the requirements of § 75.1908(a) must be provided with an automatic fire suppression system meeting the requirements of § 75.1911.

(i) Self-propelled nonpermissible light-duty diesel-powered equipment meeting the requirements of § 75.1908(b) must be provided with an automatic or manual fire suppression system meeting the requirements of § 75.1911.

(j) Nonpermissible equipment that is not self-propelled must have the following features in addition to those listed in paragraph (a):

(1) A means to prevent inadvertent movement of the equipment when parked;

(2) Safety chains or other suitable secondary connections on equipment that is being towed; and

(3) An automatic fire suppression system meeting the requirements of § 75.1911.

[61 FR 55527, Oct. 25, 1996; 62 FR 34641, June 27, 1997]

§ 75.1910 Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

Electrical circuits and components associated with or connected to electrical systems on nonpermissible diesel-powered equipment utilizing storage batteries and integral charging systems, except for the special category of equipment under § 75.1908(d), must conform to the following requirements:

(a) Overload and short circuit protection must be provided for electric circuits and components in accordance with §§ 75.518 and 75.518-1 of this part;

(b) Each electric conductor from the battery to the starting motor must be protected against short circuit by fuses or other circuit-interrupting devices placed as near as practicable to the battery terminals;

(c) Each branch circuit conductor connected to the main circuit between the battery and charging generator must be protected against short circuit by fuses or other automatic circuit-interrupting devices;

(d) The electrical system shall be equipped with a circuit-interrupting device by means of which all power conductors can be deenergized. The device must be located as close as practicable to the battery terminals and be designed to operate within its electrical rating without damage. The device shall not automatically reset after being actuated. All magnetic circuit-interrupting devices must be mounted in a manner to preclude their closing by force of gravity;

(e) Each motor and charging generator must be protected by an automatic overcurrent device. One protective device will be acceptable when two motors of the same rating operate simultaneously and perform virtually the same duty;

(f) Each ungrounded conductor must have insulation compatible with the impressed voltage. Insulation materials must be resistant to deterioration from engine heat and oil. Electric conductors must meet the applicable requirements of §§ 75.513 and 75.513-1, except electric conductors for starting motors, which must only meet the requirements of § 75.513;

(g) All wiring must have adequate mechanical protection to prevent damage to the cable that might result in short circuits;

(h) Sharp edges and corners must be removed at all points where there is a possibility of damaging wires, cables, or conduits by cutting or abrasion. The insulation of the cables within a battery box must be protected against abrasion;

(i) When insulated wires other than cables pass through metal frames, the holes must be substantially bushed with insulated bushings. Cables must enter metal frames of motors, splice boxes, and electric components only through proper fittings. All electrical connections and splices must be mechanically and electrically efficient, and suitable connectors shall be used. All electrical connectors or splices in insulated wire must be reinsulated at least to the same degree of protection as the remainder of the wire;

(j) The battery must be secured to prevent movement, and must be protected from external damage by position. Batteries that are not protected from external damage by position must be enclosed in a battery box. Flame-resistant insulation treated to resist chemical reaction to electrolyte must be provided on battery connections to prevent battery terminals from contacting conducting surfaces;

(k) A battery box, including the cover, must be constructed of steel with a minimum thickness of 1/8 inch, or of a material other than steel that provides equivalent strength;

(l) Battery-box covers must be lined with a flame-resistant insulating material permanently attached to the underside of the cover, unless equivalent protection is provided. Battery-box covers must be provided with a means for securing them in closed position. At least 1/2 inch of air space must be provided between the underside of the cover and the top of the battery, including terminals;

(m) Battery boxes must be provided with ventilation openings to prevent the accumulation of flammable or toxic gases or vapors within the battery box. The size and locations of openings for ventilation must prevent direct access to battery terminals;

(n) The battery must be insulated from the battery-box walls and supported on insulating materials. Insulating materials that may be subject to chemical reaction with electrolyte must be treated to resist such action; and

(o) Drainage holes must be provided in the bottom of each battery box.

§ 75.1911 Fire suppression systems for diesel-powered equipment and fuel transportation units.

(a) The fire suppression system required by §§ 75.1907 and 75.1909 shall be a multipurpose dry chemical type (ABC) fire suppression system listed or approved by a nationally recognized independent testing laboratory and appropriate for installation on diesel-powered equipment and fuel transportation units.

(1) The system shall be installed in accordance with the manufacturer's specifications and the limitations of the listing or approval.

(2) The system shall be installed in a protected location or guarded to minimize physical damage from routine vehicle operations.

(3) Suppressant agent distribution tubing or piping shall be secured and protected against damage, including pinching, crimping, stretching, abrasion, and corrosion.

(4) Discharge nozzles shall be positioned and aimed for maximum fire suppression effectiveness. Nozzles shall also be protected against the entrance of foreign materials such as mud, coal dust, or rock dust.

(b) The fire suppression system shall provide fire suppression and, if automatic, fire detection for the engine including the starter, transmission, hydraulic pumps and tanks, fuel tanks, exposed brake units, air compressors and battery areas on diesel-powered equipment and electric panels or controls used on fuel transportation units and other areas as necessary.

(c) If automatic, the fire suppression system shall include audible and visual alarms to warn of fires or system faults.

(d) The fire suppression system shall provide for automatic engine shutdown. If the fire suppression system is automatic, engine shutdown and discharge of suppressant agent may be delayed for a maximum of 15 seconds after the fire is detected by the system.

(e) The fire suppression system shall be operable by at least two manual actuators. One actuator shall be located on each side of the equipment. If the equipment is provided with an operator's compartment, one of the manual actuators shall be located in the compartment within reach of the operator.

(f) The fire suppression system shall remain operative in the event of engine shutdown, equipment electrical system failure, or failure of any other equipment system.

(g) The electrical components of each fire suppression system installed on equipment used where permissible electric equipment is required shall be permissible or intrinsically safe and such components shall be maintained in permissible or intrinsically safe condition.

(h) Electrically operated detection and actuation circuits shall be monitored and provided with status indicators showing power and circuit continuity. If the system is not electrically operated, a means shall be provided to indicate the functional readiness status of the detection system.

(i) Each fire suppression system shall be tested and maintained in accordance with the manufacturer's recommended inspection and maintenance program and as required by the nationally recognized independent testing laboratory listing or approval, and be visually inspected at least once each week by a person trained to make such inspections.

(j) Recordkeeping. Persons performing inspections and tests of fire suppression systems under paragraph (i) shall record when a fire suppression system does not meet the installation or maintenance requirements of this section.

(1) The record shall include the equipment on which the fire suppression system did not meet the installation or maintenance requirements of this section, the defect found, and the corrective action taken.

(2) Records are to be kept manually in a secure manner not susceptible to alteration or recorded electronically in a secured computer system that is not susceptible to alteration.

(3) Records shall be maintained at a surface location at the mine for one year and made available for inspection by an authorized representative of the Secretary and miners' representatives.

(k) All miners normally assigned to the active workings of the mine shall be instructed about the hazards inherent to the operation of the fire suppression systems and, where appropriate, the safeguards available for each system.

(l) For purposes of § 75.380(f), a fire suppression system installed on diesel-powered equipment and meeting the requirements of this section is equivalent to a fire suppression system meeting the requirements of §§ 75.1107-3 through 75.1107-16.

§ 75.1912 Fire suppression systems for permanent underground diesel fuel storage facilities.

(a) The fire suppression system required by § 75.1903 shall be an automatic multipurpose dry chemical type (ABC) fire suppression system listed or approved as an engineered dry chemical extinguishing system by a nationally recognized independent testing laboratory and appropriate for installation at a permanent underground diesel fuel storage facility.

(1) Alternate types of fire suppression systems shall be approved in accordance with § 75.1107-13 of this part.

(2) The system shall be installed in accordance with the manufacturer's specifications and the limitations of the listing or approval.

(3) The system shall be installed in a protected location or guarded to prevent physical damage from routine operations.

(4) Suppressant agent distribution tubing or piping shall be secured and protected against damage, including pinching, crimping, stretching, abrasion, and corrosion.

(5) Discharge nozzles shall be positioned and aimed for maximum fire suppression effectiveness in the protected areas. Nozzles must also be protected against the entrance of foreign materials such as mud, coal dust, and rock dust.

(b) The fire suppression system shall provide automatic fire detection and automatic fire suppression for all areas within the facility.

(c) Audible and visual alarms to warn of fire or system faults shall be provided at the protected area and at a surface location which is continually monitored by a person when personnel are underground. In the event of a fire, personnel shall be warned in accordance with the provisions set forth in § 75.1502.

(d) The fire suppression system shall deenergize all power to the diesel fuel storage facility when actuated except that required for automatic enclosure and alarms.

(e) Fire suppression systems shall include two manual actuators located as follows:

(1) At least one within the fuel storage facility; and

(2) At least one a safe distance away from the storage facility and located in intake air, upwind of the storage facility.

(f) The fire suppression system shall remain operational in the event of electrical system failure.

(g) Electrically operated detection and actuation circuits shall be monitored and provided with status indicators showing power and circuit continuity. If the system is not electrically operated, a means shall be provided to indicate the functional readiness status of the detection system.

(h) Each fire suppression system shall be tested and maintained in accordance with the manufacturer's recommended inspection and maintenance program and as required by the nationally recognized independent testing laboratory listing or approval, and be visually inspected at least once each week by a person trained to make such inspections.

(i) Recordkeeping. Persons performing inspections and tests of fire suppression systems under paragraph (h) shall record when a fire suppression system does not meet the installation or maintenance requirements of this section.

(1) The record shall include the facility whose fire suppression system did not meet the installation or maintenance requirements of this section, the defect found, and the corrective action taken.

(2) Records are to be kept manually in a secure manner not susceptible to alteration or recorded electronically in a secured computer system that is not susceptible to alteration.

(3) Records shall be maintained at a surface location at the mine for one year and made available for inspection by an authorized representative of the Secretary and miners' representatives.

(j) All miners normally assigned to the active workings of the mine shall be instructed about the hazards inherent to the operation of the fire suppression systems and, where appropriate, the safeguards available for each system.

[61 FR 55527, Oct. 25, 1996; 70 FR 36347, June 23, 2005]

§ 75.1913 Starting aids.

(a) Volatile fuel starting aids shall be used in accordance with recommendations provided by the starting aid manufacturer, the engine manufacturer, and the machine manufacturer.

(b) Containers of volatile fuel starting aids shall be conspicuously marked to indicate the contents. When not in use, containers of volatile fuel starting aids shall be stored in metal enclosures that are used only for storage of starting aids. Such metal enclosures must be conspicuously marked, secured, and protected from damage.

(c) Volatile fuel starting aids shall not be:

(1) Taken into or used in areas where permissible equipment is required;

(2) Used in the presence of open flames or burning flame safety lamps, or when welding or cutting is taking place; or

(3) Used in any area where 1.0 percent or greater concentration of methane is present.

(d) Compressed oxygen or compressed flammable gases shall not be connected to diesel air-start systems.

§ 75.1914 Maintenance of diesel-powered equipment.

(a) Diesel-powered equipment shall be maintained in approved and safe condition or removed from service.

(b) Maintenance and repairs of approved features and those features required by §§ 75.1909 and 75.1910 on diesel-powered equipment shall be made only by a person qualified under § 75.1915.

(c) The water scrubber system on diesel-powered equipment shall be drained and flushed, by a person who is trained to perform this task, at least once on each shift in which the equipment is operated.

(d) The intake air filter on diesel-powered equipment shall be replaced or serviced, by a person who is trained to perform this task, when the intake air pressure drop device so indicates or when the engine manufacturer's maximum allowable air pressure drop level is exceeded.

(e) Mobile diesel-powered equipment that is to be used during a shift shall be visually examined by the equipment operator before being placed in operation. Equipment defects affecting safety shall be reported promptly to the mine operator.

(f) All diesel-powered equipment shall be examined and tested weekly by a person qualified under § 75.1915.

(1) Examinations and tests shall be conducted in accordance with approved checklists and manufacturers' maintenance manuals.

(2) Persons performing weekly examinations and tests of diesel-powered equipment under this paragraph shall make a record when the equipment is not in approved or safe condition. The record shall include the equipment that is not in approved or safe condition, the defect found, and the corrective action taken.

(g) Undiluted exhaust emissions of diesel engines in diesel-powered equipment approved under part 36 and heavy-duty nonpermissible diesel-powered equipment as defined in § 75.1908(a) in use in underground coal mines shall be tested and evaluated weekly by a person who is trained to perform this task. The mine operator shall develop and implement written standard operating procedures for such testing and evaluation that specify the following:

(1) The method of achieving a repeatable loaded engine operating condition for each type of equipment;

(2) Sampling and analytical methods (including calibration of instrumentation) that are capable of accurately detecting carbon monoxide in the expected concentrations;

(3) The method of evaluation and interpretation of the results;

(4) The concentration or changes in concentration of carbon monoxide that will indicate a change in engine performance. Carbon monoxide concentration shall not exceed 2500 parts per million; and

(5) The maintenance of records necessary to track engine performance.

(h) Recordkeeping. Records required by paragraphs (f)(2) and (g)(5) shall be—

(1) Recorded in a secure book that is not susceptible to alteration, or recorded electronically in a computer system that is secure and not susceptible to alteration; and

(2) Retained at a surface location at the mine for at least 1 year and made available for inspection by an authorized representative of the Secretary and by miners' representatives.

(i) Diesel-powered equipment must be maintained in accordance with this part as of November 25, 1997.

§ 75.1915 Training and qualification of persons working on diesel-powered equipment.

(a) To be qualified to perform maintenance, repairs, examinations and tests on diesel-powered equipment, as required by § 75.1914, a person must successfully complete a training and qualification program that meets the requirements of this section. A person qualified to perform these tasks shall be retrained as necessary to maintain the ability to perform all assigned diesel-powered equipment maintenance, repairs, examinations and tests.

(b) A training and qualification program under this section must:

(1) Be presented by a competent instructor;

(2) Be sufficient to prepare or update a person's ability to perform all assigned tasks with respect to diesel-powered equipment maintenance, repairs, examinations and tests;

(3) Address, at a minimum, the following:

(i) The requirements of subpart T of this part;

(ii) Use of appropriate power package or machine checklists to conduct tests to ensure that diesel-powered equipment is in approved and safe condition, with acceptable emission levels;

(iii) Proper maintenance of approved features and the correct use of the appropriate maintenance manuals, including machine adjustments, service, and assembly;

(iv) Diesel-powered equipment fire suppression system tests and maintenance;

(v) Fire and ignition sources and their control or elimination, including cleaning of the equipment;

(vi) Safe fueling procedures and maintenance of the fuel system of the equipment; and

(vii) Intake air system maintenance and tests.

(4) Include an examination that requires demonstration of the ability to perform all assigned tasks with respect to diesel-powered equipment maintenance, repairs, examinations and tests; and

(5) Be in writing. The written program shall include a description of the course content, materials, and teaching methods for initial training and retraining.

(c) Recordkeeping. The operator shall maintain a copy of the training and qualification program required by this section and a record of the names of all persons qualified under the program.

(1) The record of the names of qualified persons shall be made in a manner that is not susceptible to alteration, or recorded electronically in a computer system that is secure and not susceptible to alteration.

(2) The training and qualification program and record of qualified persons are to be kept at surface location of the mine and made available for inspection by an authorized representative of the Secretary and by miners' representatives.

§ 75.1916 Operation of diesel-powered equipment.

(a) Diesel-powered equipment shall be operated at a speed that is consistent with the type of equipment being operated, roadway conditions, grades, clearances, visibility, and other traffic.

(b) Operators of mobile diesel-powered equipment shall maintain full control of the equipment while it is in motion.

(c) Standardized traffic rules, including speed limits, signals and warning signs, shall be established at each mine and followed.

(d) Except as required in normal mining operations, mobile diesel-powered equipment shall not be idled.

(e) Diesel-powered equipment shall not be operated unattended.

PART 77 MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES

Authority: 30 U.S.C. 811.

Source: 36 FR 9364, May 22, 1971, unless otherwise noted.

Subpart A General
§ 77.1 Scope.

This part 77 sets forth mandatory safety standards for bituminous, anthracite, and lignite surface coal mines, including open pit and auger mines, and to the surface work areas of underground coal mines, pursuant to section 101(i) of the Federal Mine Safety and Health Act of 1977.

[36 FR 9364, May 22, 1971, as amended at 43 FR 12320, Mar. 24, 1978]

§ 77.2 Definitions.

For the purpose of this part 77, the term:

(a) Active workings means any place in a coal mine where miners are normally required to work or travel;

(b) American Table of Distances means the current edition of “The American Table of Distances for Storage of Explosives” published by the Institute of Makers of Explosives;

(c) Barricaded means to obstruct passage of persons, vehicles, or flying materials;

(d) Berm means a pile or mound of material capable of restraining a vehicle;

(e) Blasting agent means any material consisting of a mixture of a fuel and oxidizer which—

(1) Is used or intended for use in blasting;

(2) Is not classed as an explosive by the Department of Transportation;

(3) Contains no ingredient classed as an explosive by the Department of Transportation; and,

(4) Cannot be detonated by a No. 8 blasting cap when tested as recommended in Bureau of Mines Information Circular 8179.

(f) Blasting area means the area near blasting operations in which concussion or flying material can reasonably be expected to cause injury.

(g) Blasting cap means a detonator containing a charge of detonating compound, which is ignited by electric current, or the spark of a fuse. Used for detonating explosives.

(h) Blasting circuit means electric circuits used to fire electric detonators or to ignite an igniter cord by means of an electric starter.

(i) Blasting switch means a switch used to connect a power source to a blasting circuit.

(j) Box-type magazine means a small, portable magazine used to store limited quantities of explosives or detonators for short periods of time in locations at the mine which are convenient to the blasting sites at which they will be used.

(k) Capped fuse means a length of safety fuse to which a detonator has been attached.

(l) Capped primer means a package or cartridge of explosives which is specifically designed to transmit detonation to other explosives and which contains a detonator.

(m) Certified or registered, as applied to any person means a person certified or registered by the State in which the coal mine is located to perform duties prescribed by this Part 77, except that, in a State where no program of certification or registration is provided or where the program does not meet at least minimum Federal standards established by the Secretary, such certification or registration shall be by the Secretary.

(n) Detonating cord or detonating fuse means a flexible cord containing a core of high explosive.

(o) Detonator means a device containing a small detonating charge that is used for detonating an explosive, including, but not limited to blasting caps, exploders, electric detonators, and delay electric blasting caps.

(p) Electrical grounding means to connect with the ground to make the earth part of the circuit.

(q) Explosive means any chemical compound, mixture, or device, the primary or common purpose of which is to function by explosion. Explosives include, but are not limited to black powder, dynamite, nitroglycerin, fulminate, ammonium nitrate when mixed with a hydrocarbon, and other blasting agents.

(r) Flash point means the minimum temperature at which sufficient vapor is released by a liquid or solid to form a flammable vapor-air mixture at atmospheric pressure.

(s) Low voltage means up to and including 660 volts, medium voltage means voltages from 661 to 1,000 volts, and high voltage means more than 1,000 volts.

(t) Misfire means the complete or partial failure of a blasting charge to explode as planned.

(u) Primer or Booster means a package or cartridge of explosive which is designed specifically to transmit detonation to other explosives and which does not contain a detonator.

(v) Qualified person means, as the context requires, (1) An individual deemed qualified by the Secretary and designated by the operator to make tests and examinations required by this Part 77; and,

(2) An individual deemed, in accordance with the minimum requirements to be established by the Secretary, qualified by training, education, and experience, to perform electrical work, to maintain electrical equipment, and to conduct examinations and make tests of all electrical equipment.

(w) Roll protection means a framework, safety canopy, or similar protection for the operator when equipment overturns.

(x) Safety can means an approved container, of not over 5 gallons capacity, having a spring-closing lid and spout cover.

(y) Safety fuse means a train of powder enclosed in cotton, jute yarn, and waterproofing compounds, which burns at a uniform rate; used for firing a cap containing the detonating compound which in turn sets off the explosive charge.

(z) Safety switch means a sectionalizing switch that also provides shunt protection in blasting circuits between the blasting switch and the shot area.

(aa) Secretary means the Secretary of Labor or his delegate.

[36 FR 9364, May 22, 1971, as amended at 43 FR 12320, Mar. 24, 1978]

Subpart B Qualified and Certified Persons
§ 77.100 Certified person.

(a)(1) The provisions of this Part 77 require that certain examinations and tests be made by a certified person. A certified person within the meaning of these provisions is a person who has been certified in accordance with the provisions of paragraph (b) of this § 77.100 to perform the duties, and make the examinations and tests which are required by this Part 77 to be performed by a certified person.

(2) A person who has been so certified shall also be considered to be a qualified person within the meaning of those provisions of this Part 77 which require that certain examinations, tests and duties be performed by a qualified person, except those provisions in Subparts F, G, H, I, and J of this part relating to performance of electrical work.

(b) Pending issuance of Federal standards, a person will be considered, to the extent of the certification, a certified person to make examinations, tests and perform duties which are required by this Part 77 to be performed by a certified person:

(1) If he has been certified for such purpose by the State in which the coal mine is located; or

(2) If this person has been certified for such purpose by the Secretary. A person's initial certification is valid for as long as the person continues to satisfy the requirements necessary to obtain the certification and is employed at the same coal mine or by the same independent contractor. The mine operator or independent contractor shall make an application which satisfactorily shows that each such person has had at least 2 years experience at a coal mine or equivalent experience, and that each such person demonstrates to the satisfaction of an authorized representative of the Secretary that such person is able and competent to test for oxygen deficiency with a permissible flame safety lamp, or any other device approved by the Secretary and to test for methane with a portable methane detector approved by the Bureau of Mines, MESA, or MSHA, under Part 22 of this Chapter (Bureau of Mines Schedule 8C), and to perform such other duties for which application for certification is made. Applications for certification by the Secretary should be submitted in writing to the Mine Safety and Health Administration, Certification and Qualification Center, P.O. Box 25367, Denver Federal Center, Denver, Colorado 80225.

[36 FR 9364, May 22, 1971, as amended at 43 FR 12320, Mar. 24, 1978; 54 FR 30515, July 20, 1989]

§ 77.101 Tests for methane and for oxygen deficiency; qualified person.

(a) The provisions of Subparts C, P, R, and T of this Part 77 require that tests for methane and for oxygen deficiency be made by a qualified person. A person is a qualified person for these purposes if he is a certified person for such purposes under § 77.100.

(b) Pending issuance of Federal standards, a person will be considered a qualified person for testing for methane and oxygen deficiency:

(1) If he has been qualified for this purpose by the State in which the coal mine is located; or

(2) If he has been qualified by the Secretary for these purposes upon a satisfactory showing by the operator of the coal mine that each such person has been trained and designated by the operator to test for methane and oxygen deficiency. Applications for Secretarial qualification should be submitted in writing to the Mine Safety and Health Administration, Certification and Qualification Center, P.O. Box 25367, Denver Federal Center, Denver, Colo. 80225

[36 FR 9364, May 22, 1971, as amended at 43 FR 12320, Mar. 24, 1978]

§ 77.102 Tests for methane; oxygen deficiency; qualified person, additional requirement.

Notwithstanding the provisions of § 77.101, on and after December 30, 1971, no person shall be a qualified person for testing for methane and oxygen deficiency unless he has demonstrated to the satisfaction of an authorized representative of the Secretary that he is able and competent to make such tests and the Mine Safety and Health Administration has issued him a current card which qualifies him to make such tests.

§ 77.103 Electrical work; qualified person.

(a) Except as provided in paragraph (f) of this section, an individual is a qualified person within the meaning of Subparts F, G, H, I, and J of this Part 77 to perform electrical work (other than work on energized surface high-voltage lines) if:

(1) He has been qualified as a coal mine electrician by a State that has a coal mine electrical qualification program approved by the Secretary; or,

(2) He has at least 1 year of experience in performing electrical work underground in a coal mine, in the surface work areas of an underground coal mine, in a surface coal mine, in a noncoal mine, in the mine equipment manufacturing industry, or in any other industry using or manufacturing similar equipment, and has satisfactorily completed a coal mine electrical training program approved by the Secretary; or,

(3) He has at least 1 year of experience, prior to the date of the application required by paragraph (c) of this section, in performing electrical work underground in a coal mine, in the surface work areas of an underground coal mine, in a surface coal mine, in a noncoal mine, in the mine equipment manufacturing industry, or in any other industry using or manufacturing similar equipment, and he attains a satisfactory grade on each of the series of five written tests approved by the Secretary as prescribed in paragraph (b) of this section.

(b) The series of five written tests approved by the Secretary shall include the following categories:

(1) Direct current theory and application;

(2) Alternating current theory and application;

(3) Electric equipment and circuits;

(4) Permissibility of electric equipment; and,

(5) Requirements of Subparts F through J and S of this Part 77.

(c) In order to take the series of five written tests approved by the Secretary, an individual shall apply to the District Manager and shall certify that he meets the requirements of paragraph (a)(3) of this section. The tests will be administered in the Coal Mine Safety and Health Districts at regular intervals, or as demand requires.

(d) A score of at least 80 percent on each of the five written tests will be deemed to be a satisfactory grade. Recognition shall be given to practical experience in that 1 percentage point shall be added to an individual's score in each test for each additional year of experience beyond the 1 year requirement specified in paragraph (a)(3) of this section; however, in no case shall an individual be given more than 5 percentage points for such practical experience.

(e) An individual may, within 30 days from the date on which he received notification from the Administration of his test scores, repeat those on which he received an unsatisfactory score. If further retesting is necessary after his initial repetition, a minimum of 30 days from the date of receipt of notification of the initial retest scores shall elapse prior to such further retesting.

(f) An individual who has, prior to November 1, 1972, been qualified to perform electrical work specified in Subparts F, G, H, I, and J of this Part 77 (other than work on energized surface high-voltage lines) shall continue to be qualified until June 30, 1973. To remain qualified after June 30, 1973, such individual shall meet the requirements of either paragraph (a) (1), (2), or (3) of this section.

(g) An individual qualified in accordance with this section shall, in order to retain qualification, certify annually to the District Manager, that he has satisfactorily completed a coal mine electrical retraining program approved by the Secretary.

01(a), Federal Coal Mine Health and Safety Act of 1969; 30 U.S.C. 811(a); 83 Stat. 745)

[37 FR 22377, Oct. 19, 1972; 37 FR 28163, Dec. 21, 1972, as amended at 44 FR 9380, Feb. 13, 1979; 47 FR 23641, May 28, 1982]

§ 77.104 Repair of energized surface high-voltage lines; qualified person.

An individual is a qualified person within the meaning of § 77.704 of this part for the purpose of repairing energized surface high-voltage lines only if he has had at least 2 years experience in electrical maintenance, and at least 2 years experience in the repair of energized high-voltage lines located on poles or structures.

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971]

§ 77.105 Qualified hoistman; slope or shaft sinking operation; qualifications.

(a)(1) A person is a qualified hoistman within the provisions of Subpart T of this part, for the purpose of operating a hoist at a slope or shaft sinking operation if he has at least 1 year experience operating a hoist plant or maintaining hoist equipment and is qualified by any State as a hoistman or its equivalency, or

(2) If a State has no program for qualifying persons as hoistmen, the Secretary may qualify persons if the operator of the slope or shaft-sinking operation makes an application and a satisfactory showing that the person has had 1 year of experience operating hoists. A person's qualification is valid for as long as the person continues to satisfy the requirements for qualification and is employed at the same coal mine or by the same independent contractor.

(b) Applications for Secretarial qualification should be submitted to the Mine Safety and Health Administration, Certification and Qualification Center, P.O. Box 25367, Denver Federal Center, Denver, Colo. 80225.

[36 FR 9364, May 22, 1971, as amended at 43 FR 12320, Mar. 24, 1978; 54 FR 30515, July 20, 1989]

§ 77.106 Records of certified and qualified persons.

The operator of each coal mine shall maintain a list of all certified and qualified persons designated to perform duties under this Part 77.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995]

§ 77.107 Training programs.

Every operator of a coal mine shall provide a program, approved by the Secretary, of training and retraining both qualified and certified persons needed to carry out functions prescribed in the Act.

§ 77.107-1 Plans for training programs.

Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what, when, how, and where the operator will train and retrain persons whose work assignments require that they be certified or qualified. The program must provide—

(a) For certified persons, annual training courses in the tasks and duties which they perform as certified persons, first aid, and the provisions of this part 77; and

(b) For qualified persons, annual courses in performance of the tasks which they perform as qualified persons.

[63 FR 53761, Oct. 6, 1998]

Subpart C Surface Installations
§ 77.200 Surface installations; general.

All mine structures, enclosures, or other facilities (including custom coal preparation) shall be maintained in good repair to prevent accidents and injuries to employees.

§ 77.201 Methane content in surface installations.

The methane content in the air of any structure, enclosure or other facility shall be less than 1.0 volume per centum.

§ 77.201-1 Tests for methane; qualified person; use of approved device.

Tests for methane in structures, enclosures, or other facilities, in which coal is handled or stored shall be conducted by a qualified person with a device approved by the Secretary at least once during each operating shift, and immediately prior to any repair work in which welding or an open flame is used, or a spark may be produced.

§ 77.201-2 Methane accumulations; change in ventilation.

If, at any time, the air in any structure, enclosure or other facility contains 1.0 volume per centum or more of methane changes or adjustments in the ventilation of such installation shall be made at once so that the air shall contain less than 1.0 volume per centum of methane.

§ 77.202 Dust accumulations in surface installations.

Coal dust in the air of, or in, or on the surfaces of, structures, enclosures, or other facilities shall not be allowed to exist or accumulate in dangerous amounts.

§ 77.203 Use of material or equipment overhead; safeguards.

Where overhead repairs are being made at surface installations and equipment or material is taken into such overhead work areas, adequate protection shall be provided for all persons working or passing below the overhead work areas in which such equipment or material is being used.

§ 77.204 Openings in surface installations; safeguards.

Openings in surface installations through which men or material may fall shall be protected by railings, barriers, covers or other protective devices.

§ 77.205 Travelways at surface installations.

(a) Safe means of access shall be provided and maintained to all working places.

(b) Travelways and platforms or other means of access to areas where persons are required to travel or work, shall be kept clear of all extraneous material and other stumbling or slipping hazards.

(c) Inclined travelways shall be constructed of nonskid material or equipped with cleats.

(d) Regularly used travelways shall be sanded, salted, or cleared of snow and ice as soon as practicable.

(e) Crossovers, elevated walkways, elevated ramps, and stairways shall be of substantial construction, provided with handrails, and maintained in good condition. Where necessary toeboards shall be provided.

(f) Crossovers shall be provided where it is necessary to cross conveyors.

(g) Moving conveyors shall be crossed only at designated crossover points.

§ 77.206 Ladders; construction; installation and maintenance.

(a) Ladders shall be of substantial construction and maintained in good condition.

(b) Wooden members of ladders shall not be painted.

(c) Steep or vertical ladders which are used regularly at fixed locations shall be anchored securely and provided with backguards extending from a point not more than 7 feet from the bottom of the ladder to the top of the ladder.

(d) Fixed ladders shall not incline backwards at any point unless provided with backguards.

(e) Fixed ladders shall be anchored securely and installed to provide at least 3 inches of toe clearance.

(f) Fixed ladders shall project at least 3 feet above landings, or substantial handholds shall be provided above the landings.

§ 77.207 Illumination.

Illumination sufficient to provide safe working conditions shall be provided in and on all surface structures, paths, walkways, stairways, switch panels, loading and dumping sites, and working areas.

§ 77.208 Storage of materials.

(a) Materials shall be stored and stacked in a manner which minimizes stumbling or fall-of-material hazards.

(b) Materials that can create hazards if accidentally liberated from their containers shall be stored in a manner that minimizes the dangers.

(c) Containers holding hazardous materials must be of a type approved for such use by recognized agencies.

(d) Compressed and liquid gas cylinders shall be secured in a safe manner.

(e) Valves on compressed gas cylinders shall be protected by covers when being transported or stored, and by a safe location when the cylinders are in use.

[36 FR 9364, May 22, 1971, as amended at 67 FR 42389, June 21, 2002]

§ 77.209 Surge and storage piles.

No person shall be permitted to walk or stand immediately above a reclaiming area or in any other area at or near a surge or storage pile where the reclaiming operation may expose him to a hazard.

§ 77.210 Hoisting of materials.

(a) Hitches and slings used to hoist materials shall be suitable for handling the type of materials being hoisted.

(b) Men shall stay clear of hoisted loads.

(c) Taglines shall be attached to hoisted materials that require steadying or guidance.

§ 77.211 Draw-off tunnels; stockpiling and reclaiming operations; general.

(a) Tunnels located below stockpiles, surge piles, and coal storage silos shall be ventilated so as to maintain concentrations of methane below 1.0 volume per centum.

(b) In addition to the tests for methane required by § 77.201 such tests shall also be made before any electric equipment is energized or repaired, unless equipped with a continuous methane monitoring device installed and operated in accordance with the provisions of § 77.211-1. Electric equipment shall not be energized, operated, or repaired until the air contains less than 1.0 volume per centum of methane.

§ 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment.

Continuous methane monitoring devices shall be set to deenergize automatically electric equipment when such monitor is not operating properly and to give a warning automatically when the concentration of methane reaches a maximum percentage determined by an authorized representative of the Secretary which shall not be more than 1.0 volume per centum of methane. An authorized representative of the Secretary shall require such monitor to deenergize automatically electric equipment when the concentration of methane reaches a maximum percentage determined by such representative which shall not be more than 2.0 volume per centum of methane.

§ 77.212 Draw-off tunnel ventilation fans; installation.

When fans are used to ventilate draw-off tunnels the fans shall be:

(a) Installed on the surface;

(b) Installed in fireproof housings and connected to the tunnel openings with fireproof air ducts; and,

(c) Offset from the tunnel opening.

§ 77.213 Draw-off tunnel escapeways.

When it is necessary for a tunnel to be closed at one end, an escapeway not less than 30 inches in diameter (or of the equivalent, if the escapeway does not have a circular cross section) shall be installed which extends from the closed end of the tunnel to a safe location on the surface; and, if the escapeway is inclined more than 30 degrees from the horizontal it shall be equipped with a ladder which runs the full length of the inclined portion of the escapeway.

§ 77.214 Refuse piles; general.

(a) Refuse piles constructed on or after July 1, 1971, shall be located in areas which are a safe distance from all underground mine airshafts, preparation plants, tipples, or other surface installations and such piles shall not be located over abandoned openings or steamlines.

(b) Where new refuse piles are constructed over exposed coal beds the exposed coal shall be covered with clay or other inert material as the piles are constructed.

(c) A fireproof barrier of clay or inert material shall be constructed between old and new refuse piles.

(d) Roadways to refuse piles shall be fenced or otherwise guarded to restrict the entrance of unauthorized persons.

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971]

§ 77.215 Refuse piles; construction requirements.

(a) Refuse deposited on a pile shall be spread in layers and compacted in such a manner so as to minimize the flow of air through the pile.

(b) Refuse shall not be deposited on a burning pile except for the purpose of controlling or extinguishing a fire.

(c) Clay or other sealants shall be used to seal the surface of any refuse pile in which a spontaneous ignition has occurred.

(d) Surface seals shall be kept intact and protected from erosion by drainage facilities.

(e) Refuse piles shall not be constructed so as to impede drainage or impound water.

(f) Refuse piles shall be constructed in such a manner as to prevent accidental sliding and shifting of materials.

(g) No extraneous combustible material shall be deposited on refuse piles.

(h) After October 31, 1975 new refuse piles and additions to existing refuse piles, shall be constructed in compacted layers not exceeding 2 feet in thickness and shall not have any slope exceeding 2 horizontal to 1 vertical (approximately 27°) except that the District Manager may approve construction of a refuse pile in compacted layers exceeding 2 feet in thickness and with slopes exceeding 27° where engineering data substantiates that a minimum safety factor of 1.5 for the refuse pile will be attained.

(i) Foundations for new refuse piles and additions to existing refuse piles shall be cleared of all vegetation and undesirable material that according to current, prudent engineering practices would adversely affect the stability of the refuse pile.

(j) All fires in refuse piles shall be extinguished, and the method used shall be in accordance with a plan approved by the District Manager. The plan shall contain as a minimum, provisions to ensure that only those persons authorized by the operator, and who have an understanding of the procedure to be used, shall be involved in the extinguishing operation.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957), Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 40 FR 41776, Sept. 9, 1975; 60 FR 33723, June 29, 1995]

§ 77.215-1 Refuse piles; identification.

A permanent identification marker, at least six feet high and showing the refuse pile identification number as assigned by the District Manager, the name associated with the refuse pile and the name of the person owning, operating or controlling the refuse pile, shall be located on or immediately adjacent to each refuse pile within the time specified in paragraphs (a) or (b) of this section as applicable.

(a) For existing refuse piles, markers shall be placed before May 1, 1976.

(b) For new or proposed refuse piles, markers shall be placed within 30 days from acknowledgment of the proposed location of a new refuse pile.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41776, Sept. 9, 1975]

§ 77.215-2 Refuse piles; reporting requirements.

(a) The proposed location of a new refuse pile shall be reported to and acknowledged in writing by the District Manager prior to the beginning of any work associated with the construction of the refuse pile.

(b) Before May 1, 1976, for existing refuse piles, or within 180 days from the date of acknowledgment of the proposed location of a new refuse pile, the person owning, operating or controlling a refuse pile shall submit to the District Manager a report in triplicate which contains the following:

(1) The name and address of the person owning, operating or controlling the refuse pile; the name associated with the refuse pile; the identification number of the refuse pile as assigned by the District Manager; and the identification number of the mine or preparation plant as assigned by MSHA.

(2) The location of the refuse pile indicated on the most recent USGS 7 1/2 minute or 15 minute topographic quadrangle map, or a topographic map of equivalent scale if a USGS map is not available.

(3) A statement of the construction history of the refuse pile, and a statement indicating whether the refuse pile has been abandoned in accordance with a plan approved by the District Manager.

(4) A topographic map showing at a scale not to exceed 1 inch = 400 feet, the present and proposed maximum extent of the refuse pile and the area 500 feet around the proposed maximum perimeter.

(5) A statement of whether or not the refuse pile is burning.

(6) A description of measures taken to prevent water from being impounded by the refuse pile or contained within the refuse pile.

(7) At a scale not to exceed 1 inch = 100 feet, cross sections of the length and width of the refuse pile at sufficient intervals to show the approximate original ground surface, the present configuration and the proposed maximum extent of the refuse pile, and mean sea level elevations at significant points.

(8) Any other information pertaining to the stability of the pile which may be required by the District Manager.

(c) The information required by paragraphs (b)(4) through (b)(8) of this section shall be reported every twelfth month from the date of original submission for those refuse piles which the District Manager has determined can present a hazard until the District Manager notifies the operator that the hazard has been eliminated.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957), Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[40 FR 41776, Sept. 9, 1975, as amended at 57 FR 7471, Mar. 2, 1992; 60 FR 33723, June 29, 1995]

§ 77.215-3 Refuse piles: certification.

(a) Within 180 days following written notification by the District Manager that a refuse pile can present a hazard, the person owning, operating, or controlling the refuse pile shall submit to the District Manager a certification by a registered engineer that the refuse pile is being constructed or has been modified in accordance with current, prudent engineering practices to minimize the probability of impounding water and failure of such magnitude as to endanger the lives of miners.

(b) After the initial certification required by this section and until the District Manager notifies the operator that the hazard has been eliminated, certification shall be submitted every twelfth month from the date of the initial certification.

(c) Certifications required by paragraphs (a) and (b) of this section shall include all information considered in making the certification.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41776, Sept. 9, 1975, as amended at 57 FR 7471, Mar. 2, 1992]

§ 77.215-4 Refuse piles; abandonment.

When a refuse pile is to be abandoned, the District Manager shall be notified in writing, and if he determines it can present a hazard, the refuse pile shall be abandoned in accordance with a plan submitted by the operator and approved by the District Manager. The plan shall include a schedule for its implementation and describe provisions to prevent burning and future impoundment of water, and provide for major slope stability.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957), Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[40 FR 41776, Sept. 9, 1975, as amended at 60 FR 33723, June 29, 1995]

§ 77.216 Water, sediment, or slurry impoundments and impounding structures; general.

(a) Plans for the design, construction, and maintenance of structures which impound water, sediment, or slurry shall be required if such an existing or proposed impounding structure can:

(1) Impound water, sediment, or slurry to an elevation of five feet or more above the upstream toe of the structure and can have a storage volume of 20 acre-feet or more; or

(2) Impound water, sediment, or slurry to an elevation of 20 feet or more above the upstream toe of the structure; or

(3) As determined by the District Manager, present a hazard to coal miners.

(b) Plans for the design and construction of all new water, sediment, or slurry impoundments and impounding structures which meet the requirements of paragraph (a) of this section shall be submitted in triplicate to and be approved by the District Manager prior to the beginning of any work associated with construction of the impounding structure.

(c) Before May 1, 1976, a plan for the continued use of an existing water, sediment, or slurry impoundment and impounding structure which meets the requirements of paragraph (a) of this section shall be submitted in triplicate to the District Manager for approval.

(d) The design, construction, and maintenance of all water, sediment, or slurry impoundments and impounding structures which meet the requirements of paragraph (a) of this section shall be implemented in accordance with the plan approved by the District Manager.

(e) All fires in impounding structures shall be extinguished, and the method used shall be in accordance with a plan approved by the District Manager. The plan shall contain as a minimum, provisions to ensure that only those persons authorized by the operator, and who have an understanding of the procedures to be used, shall be involved in the extinguishing operation.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41776, Sept. 9, 1975]

§ 77.216-1 Water, sediment or slurry impoundments and impounding structures; identification.

A permanent identification marker, at least six feet high and showing the identification number of the impounding structure as assigned by the District Manager, the name associated with the impounding structure and name of the person owning, operating, or controlling the structure, shall be located on or immediately adjacent to each water, sediment or slurry impounding structure within the time specified in paragraph (a) or (b) of this section as applicable.

(a) For existing water, sediment or slurry impounding structures, markers shall be placed before May 1, 1976.

(b) For new or proposed water, sediment, or slurry impounding structures, markers shall be placed within 30 days from the start of construction.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41777, Sept. 9, 1975]

§ 77.216-2 Water, sediment, or slurry impoundments and impounding structures; minimum plan requirements; changes or modifications; certification.

(a) The plan specified in § 77.216, shall contain as a minimum the following information:

(1) The name and address of the persons owning, operating or controlling the impoundment or impounding structure; the name associated with the impoundment or impounding structure; the identification number of the impounding structure as assigned by the District Manager; and the identification number of the mine or preparation plant as assigned by MSHA.

(2) The location of the structure indicated on the most recent USGS 7 1/2 minute or 15 minute topographic quadrangle map, or a topographic map of equivalent scale if a USGS map is not available.

(3) A statement of the purpose for which the structure is or will be used.

(4) The name and size in acres of the watershed affecting the impoundment.

(5) A description of the physical and engineering properties of the foundation materials on which the structure is or will be constructed.

(6) A statement of the type, size, range, and physical and engineering properties of the materials used, or to be used, in constructing each zone or stage of the impounding structure; the method of site preparation and construction of each zone; the approximate dates of construction of the structure and each successive stage; and for existing structures, such history of construction as may be available, and any record or knowledge of structural instability.

(7) At a scale not to exceed 1 inch = 100 feet, detailed dimensional drawings of the impounding structure including a plan view and cross sections of the length and width of the impounding structure, showing all zones, foundation improvements, drainage provisions, spillways, diversion ditches, outlets, instrument locations, and slope protection, in addition to the measurement of the minimum vertical distance between the crest of the impounding structure and the reservoir surface at present and under design storm conditions, sediment or slurry level, water level and other information pertinent to the impoundment itself, including any identifiable natural or manmade features which could affect operation of the impoundment.

(8) A description of the type and purpose of existing or proposed instrumentation.

(9) Graphs showing area-capacity curves.

(10) A statement of the runoff attributable to the probable maximum precipitation of 6-hour duration and the calculations used in determining such runoff.

(11) A statement of the runoff attributable to the storm for which the structure is designed and the calculations used in determining such runoff.

(12) A description of the spillway and diversion design features and capacities and calculations used in their determination.

(13) The computed minimum factor of safety range for the slope stability of the impounding structure including methods and calculations used to determine each factor of safety.

(14) The locations of surface and underground coal mine workings including the depth and extent of such workings within the area 500 feet around the perimeter, shown at a scale not to exceed one inch = 500 feet.

(15) Provisions for construction surveillance, maintenance, and repair of the impounding structure.

(16) General provisions for abandonment.

(17) A certification by a registered engineer that the design of the impounding structure is in accordance with current, prudent engineering practices for the maximum volume of water, sediment, or slurry which can be impounded therein and for the passage of runoff from the designed storm which exceeds the capacity of the impoundment; or, in lieu of the certification, a report indicating what additional investigations, analyses, or improvement work are necessary before such a certification can be made, including what provisions have been made to carry out such work in addition to a schedule for completion of such work.

(18) Such other information pertaining to the stability of the impoundment and impounding structure which may be required by the District Manager.

(b) Any changes or modifications to plans for water, sediment, or slurry impoundments or impounding structures shall be approved by the District Manager prior to the initiation of such changes or modifications.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41777, Sept. 9, 1975]

§ 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.

(a) All water, sediment, or slurry impoundments that meet the requirements of § 77.216(a) shall be examined as follows:

(1) At intervals not exceeding 7 days, or as otherwise approved by the District Manager, for appearances of structural weakness and other hazardous conditions.

(2) All instruments shall be monitored at intervals not exceeding 7 days, or as otherwise approved by the District Manager.

(3) Longer inspection or monitoring intervals approved under this paragraph (a) shall be justified by the operator based on the hazard potential and performance of the impounding structure, and shall include a requirement for inspection immediately after a specified rain event approved by the District Manager.

(4) All inspections required by this paragraph (a) shall be performed by a qualified person designated by the person owning, operating, or controlling the impounding structure.

(b) When a potentially hazardous condition develops, the person owning, operating or controlling the impounding structure shall immediately:

(1) Take action to eliminate the potentially hazardous condition;

(2) Notify the District Manager;

(3) Notify and prepare to evacuate, if necessary, all coal miners from coal mine property which may be affected by the potentially hazardous conditions; and

(4) Direct a qualified person to monitor all instruments and examine the structure at least once every eight hours, or more often as required by an authorized representative of the Secretary.

(c) After each examination and instrumentation monitoring referred to in paragraphs (a) and (b) of this section, each qualified person who conducted all or any part of the examination or instrumentation monitoring shall promptly record the results of such examination or instrumentation monitoring in a book which shall be available at the mine for inspection by an authorized representative of the Secretary, and such qualified person shall also promptly report the results of the examination or monitoring to one of the persons specified in paragraph (d) of this section.

(d) All examination and instrumentation monitoring reports recorded in accordance with paragraph (c) of this section shall include a report of the action taken to abate hazardous conditions and shall be promptly signed or countersigned by at least one of the following persons:

(1) The mine foreman;

(2) The assistant superintendent of the mine;

(3) The superintendent of the mine;

(4) The person designated by the operator as responsible for health and safety at the mine.

(e) Before May 1, 1976, the person owning, operating, or controlling a water, sediment, or slurry impoundment which meets the requirements of § 77.216(a) shall adopt a program for carrying out the requirements of paragraphs (a) and (b) of this section. The program shall be submitted for approval to the District Manager. The program shall include as a minimum:

(1) A schedule and procedures for examining the impoundment and impounding structure by a designated qualified person;

(2) A schedule and procedures for monitoring any required or approved instrumentation by a designated qualified person;

(3) Procedures for evaluating hazardous conditions;

(4) Procedures for eliminating hazardous conditions;

(5) Procedures for notifying the District Manager;

(6) Procedures for evacuating coal miners from coal mine property which may be affected by the hazardous condition.

(f) Before making any changes or modifications in the program approved in accordance with paragraph (e) of this section, the person owning, operating, or controlling the impoundment shall obtain approval of such changes or modifications from the District Manager.

(g) The qualified person or persons referred to in paragraphs (a), (b)(4), (c), (e)(1), and (e)(2) of this section shall be trained to recognize specific signs of structural instability and other hazardous conditions by visual observation and, if applicable, to monitor instrumentation.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41777, Sept. 9, 1975, as amended at 57 FR 7471, Mar. 2, 1992]

§ 77.216-4 Water, sediment or slurry impoundments and impounding structures; reporting requirements; certification.

(a) Except as provided in paragraph (b) of this section, every twelfth month following the date of the initial plan approval, the person owning, operating, or controlling a water, sediment, or slurry impoundment and impounding structure that has not been abandoned in accordance with an approved plan shall submit to the District Manager a report containing the following information:

(1) Changes in the geometry of the impounding structure for the reporting period.

(2) Location and type of installed instruments and the maximum and minimum recorded readings of each instrument for the reporting period.

(3) The minimum, maximum, and present depth and elevation of the impounded water, sediment, or slurry for the reporting period.

(4) Storage capacity of the impounding structure.

(5) The volume of the impounded water, sediment, or slurry at the end of the reporting period.

(6) Any other change which may have affected the stability or operation of the impounding structure that has occurred during the reporting period.

(7) A certification by a registered professional engineer that all construction, operation, and maintenance was in accordance with the approved plan.

(b) A report is not required under this section when the operator provides the District Manager with a certification by a registered professional engineer that there have been no changes under paragraphs (a)(1) through (a)(6) of this section to the impoundment or impounding structure. However, a report containing the information set out in paragraph (a) of this section shall be submitted to the District Manager at least every 5 years.

[57 FR 7471, Mar. 2, 1992]

§ 77.216-5 Water, sediment or slurry impoundments and impounding structures; abandonment.

(a) Prior to abandonment of any water, sediment, or slurry impoundment and impounding structure which meets the requirements of 30 CFR 77.216(a), the person owning, operating, or controlling such an impoundment and impounding structure shall submit to and obtain approval from the District Manager, a plan for abandonment based on current, prudent engineering practices. This plan shall provide for major slope stability, include a schedule for the plan's implementation and, except as provided in paragraph (b) of this section, contain provisions to preclude the probability of future impoundment of water, sediment, or slurry.

(b) An abandonment plan does not have to contain a provision to preclude the future impoundment of water if the plan is approved by the District Manager and documentation is included in the abandonment plan to ensure that the following requirements are met:

(1) A registered professional engineer, knowledgeable in the principles of dam design and in the design and construction of the structure, shall certify that it substantially conforms to the approved design plan and specifications and that there are no apparent defects.

(2) The current owner or prospective owner shall certify a willingness and ability to assume responsibility for operation and maintenance of the structure.

(3) A permit or approval for the continued existence of the impoundment or impounding structure shall be obtained from the Federal or State agency responsible for dam safety.

[57 FR 7472, Mar. 2, 1992]

§ 77.217 Definitions.

For the purpose of §§ 77.214 through 77.216-5, the term:

(a) Abandoned as applied to any refuse pile or impoundment and impounding structure means that work on such pile or structure has been completed in accordance with a plan for abandonment approved by the District Manager.

(b) Area-capacity curves means graphic curves which readily show the reservoir water surface area, in acres, at different elevations from the bottom of the reservoir to the maximum water surface, and the capacity or volume, in acre-feet, of the water contained in the reservoir at various elevations.

(c) Impounding structure means a structure which is used to impound water, sediment, or slurry, or any combination of such materials.

(d) Probable maximum precipitation means the value for a particular area which represents an envelopment of depth-duration-area rainfall relations for all storm types affecting that area adjusted meteorologically to maximum conditions.

(e) Refuse pile means a deposit of coal mine waste which may contain a mixture of coal, shale, claystone, siltstone, sandstone, limestone, and related materials that are excavated during mining operations or separated from mined coal and disposed of on the surface as waste byproducts of either coal mining or preparation operations. Refuse pile does not mean temporary spoil piles of removed overburden material associated with surface mining operations.

(f) Safety factor means the ratio of the forces tending to resist the failure of a structure to the forces tending to cause such failure as determined by accepted engineering practice.

(Secs. 101, 508, Pub. L. 91-173, 83 Stat. 745, 803 (30 U.S.C. 811, 957))

[40 FR 41778, Sept. 9, 1975]

Subpart D Thermal Dryers
§ 77.300 Thermal dryers; general.

On and after July 1, 1971 dryer systems used for drying coal at high temperatures, hereinafter referred to as thermal dryers, including rotary dryers, continuous carrier dyes, vertical tray, and cascade dryers, multilouver dryers, suspension or flash dryers, and fluidized bed dryers, shall be maintained and operated in accordance with the provision of § 77.301 to § 77.306.

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971]

§ 77.301 Dryer heating units; operation.

(a) Dryer heating units shall be operated to provide reasonably complete combustion before heated gases are allowed to enter hot gas inlets.

(b) Dryer heating units which are fired by pulverized coal, shall be operated and maintained in accordance with the recommended standards set forth in the National Fire Protection Association Handbook, 12th Edition, Section 9, “Installation of Pulverized Fuel Systems,” 1962.

§ 77.302 Bypass stacks.

Thermal dryer systems shall include a bypass stack, relief stack or individual discharge stack provided with automatic venting which will permit gases from the dryer heating unit to bypass the heating chamber and vent to the outside atmosphere during any shutdown operation.

§ 77.303 Hot gas inlet chamber dropout doors.

Thermal dryer systems which employ a hot gas inlet chamber shall be equipped with drop-out doors at the bottom of the inlet chamber or with other effective means which permit coal, fly-ash, or other heated material to fall from the chamber.

§ 77.304 Explosion release vents.

Drying chambers, dry-dust collectors, ductwork connecting dryers to dust collectors, and ductwork between dust collectors and discharge stacks shall be protected with explosion release vents which open directly to the outside atmosphere, and all such vents shall be:

(a) Hinged to prevent dislodgment;

(b) Designed and constructed to permit checking and testing by manual operation; and

(c) Equal in size to the cross-sectional area of the collector vortex finder when used to vent dry dust collectors.

§ 77.305 Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

Drying chambers, hot gas inlet chambers and all ductwork in which coal dust may accumulate shall be equipped with tight sealing access doors which shall remain latched during dryer operation to prevent the emission of coal dust and the loss of fluidizing air.

§ 77.306 Fire protection.

Based on the need for fire protection measures in connection with the particular design of the thermal dryer, an authorized representative of the Secretary may require any of the following measures to be employed:

(a) Water sprays automatically actuated by rises in temperature to prevent fire, installed inside the thermal dryer systems, and such sprays shall be designed to provide for manual operation in the event of power failure.

(b) Fog nozzles, or other no less effective means, installed inside the thermal dryer systems to provide additional moisture or an artificial drying load within the drying system when the system is being started or shutdown.

(c) The water system of each thermal dryer shall be interconnected to a supply of compressed air which permits constant or frequent purging of all water sprays and fog nozzles or other no less effective means of purging shall be provided.

§ 77.307 Thermal dryers; location and installation; general.

(a) Thermal dryer systems erected or installed at any coal mine after June 30, 1971 shall be located at least 100 feet from any underground coal mine opening, and 100 feet from any surface installation where the heat, sparks, flames, or coal dust from the system might cause a fire or explosion.

(b) Thermal dryer systems erected or installed after June 30, 1971 may be covered by roofs, however, such systems shall not be otherwise enclosed unless necessary to protect the health and safety of persons employed at the mine. Where such systems are enclosed, they shall be located in separate fireproof structures of heavy construction with explosion pressure release devices (such as hinged wall panels, window sashes, or louvers); which provide at least 1 square foot of area for each 80 cubic feet of space volume and which are distributed as uniformly as possible throughout the structure.

§ 77.308 Structures housing other facilities; use of partitions.

Thermal dryer systems installed after June 30, 1971 in any structure which also houses a tipple, cleaning plant, or other operating facility shall be separated from all other working areas of such structure by a substantial partition capable of providing greater resistance to explosion pressures than the exterior wall or walls of the structure. The partition shall also include substantial, self-closing fire doors at all entrances to the areas adjoining the dryer system.

§ 77.309 Visual check of system equipment.

Frequent visual checks shall be made by the operator of the thermal dryer system control station, or by some other competent person, of the bypass dampers, air-tempering louvers, discharge mechanism, and other dryer system equipment.

§ 77.309-1 Control stations; location.

Thermal dryer system control stations constructed after June 30, 1971, shall be installed at a location which will give to the operator of the control station the widest field of visibility of the system and equipment.

§ 77.310 Control panels.

(a) All thermal dryer system control panels constructed after June 30, 1971 shall be located in an area which is relatively free of moisture and dust and shall be installed in such a manner as to minimize vibration.

(b) A schematic diagram containing legends which show the location of each thermocouple, pressure tap, or other control or gaging instrument in the drying system shall be posted on or near the control panel of each thermal drying system.

(c) Each instrument on the control panel shall be identified by a nameplate or equivalent marking.

(d) A plan to control the operation of each thermal dryer system shall be posted at or near the control panel showing a sequence of startup, normal shutdown, and emergency shutdown procedures.

§ 77.311 Alarm devices.

Thermal dryer systems shall be equipped with both audible and visual alarm devices which are set to operate when safe dryer temperatures are exceeded.

§ 77.312 Fail safe monitoring systems.

Thermal dryer systems and controls shall be protected by a fail safe monitoring system which will safely shut down the system and any related equipment upon failure of any component in the dryer system.

§ 77.313 Wet-coal feedbins; low-level indicators.

Wet-coal bins feeding thermal drying systems shall be equipped with both audible and visual low-coal-level indicators.

§ 77.314 Automatic temperature control instruments.

(a) Automatic temperature control instruments for thermal dryer system shall be of the recording type.

(b) Automatic temperature control instruments shall be locked or sealed to prevent tampering or unauthorized adjustment. These instruments shall not be set above the maximum allowable operating temperature.

(c) All dryer control instruments shall be inspected and calibrated at least once every 3 months and a record or certificate of accuracy, signed by a trained employee or by a servicing agent, shall be kept at the plant.

§ 77.315 Thermal dryers; examination and inspection.

Thermal dryer systems shall be examined for fires and coal-dust accumulations if the dryers are not restarted promptly after a shutdown.

Subpart E Safeguards for Mechanical Equipment
§ 77.400 Mechanical equipment guards.

(a) Gears; sprockets; chains; drive, head, tail, and takeup pulleys; flywheels; couplings; shafts; sawblades; fan inlets; and similar exposed moving machine parts which may be contacted by persons, and which may cause injury to persons shall be guarded.

(b) Overhead belts shall be guarded if the whipping action from a broken line would be hazardous to persons below.

(c) Guards at conveyor-drive, conveyor-head, and conveyor-tail pulleys shall extend a distance sufficient to prevent a person from reaching behind the guard and becoming caught between the belt and the pulley.

(d) Except when testing the machinery, guards shall be securely in place while machinery is being operated.

§ 77.401 Stationary grinding machines; protective devices.

(a) Stationary grinding machines other than special bit grinders shall be equipped with:

(1) Peripheral hoods (less than 90° throat openings) capable of withstanding the force of a bursting wheel.

(2) Adjustable tool rests set as close as practical to the wheel.

(3) Safety washers.

(b) Grinding wheels shall be operated within the specifications of the manufacturer of the wheel.

(c) Face shields or goggles, in good condition, shall be worn when operating a grinding wheel.

§ 77.402 Hand-held power tools; safety devices.

Hand-held power tools shall be equipped with controls requiring constant hand or finger pressure to operate the tools or shall be equipped with friction or other equivalent safety devices.

§ 77.403 Mobile equipment; falling object protective structures (FOPS).

(a) When necessary to protect the operator of the equipment, all rubber-tired or crawler-mounted self-propelled scrapers, front-end loaders, dozers, graders, loaders, and tractors, with or without attachments, that are used in surface coal mines or the surface work areas of underground coal mines shall be provided with substantial falling object protective structures (FOPS). FOPS which meet the requirements of the Society of Automotive Engineers (SAE) Standard J 231 shall be considered to be a “substantial” FOPS. An authorized representative of the Secretary may approve a FOPS which provides protection equivalent to SAE J 231.

(b) When necessary to protect the operator of the equipment, forklift or powered industrial trucks shall be provided with substantial FOPS. Such FOPS shall meet the requirements of the State of California, Division of Industrial Safety, General Safety Orders, Register 72, Number 6, February 8, 1972, Article 25, Section 3655—“Overhead Guards for High-Lift Rider Trucks.”

(Sec. 101(a), Federal Coal Mine Health and Safety Act of 1969, as amended (83 Stat. 745; 30 U.S.C. 811(a))

[39 FR 24007, June 28, 1974]

§ 77.403-1 Mobile equipment; rollover protective structures (ROPS).

(a) All rubber-tired or crawler-mounted self-propelled scrapers, front-end loaders, dozers, graders, loaders, and tractors, with or without attachments, that are used in surface coal mines or the surface work areas of underground coal mines shall be provided with rollover protective structures (hereinafter referred to as ROPS) in accordance with the requirements of paragraphs (b) through (f) of this section, as applicable.

(b) Mobile equipment manufactured on and after September 1, 1974. All mobile equipment described in paragraph (a) of this section manufactured on and after September 1, 1974 shall be equipped with ROPS meeting the requirements of the Department of Labor specified in §§ 1926.1001 and 1926.1002 of Part 1926, Title 29, Code of Federal Regulations—Safety and Health Regulations for Construction.

(c) Mobile equipment manufactured prior to September 1, 1974. All mobile equipment described in paragraph (a) of this section manufactured prior to September 1, 1974 shall be equipped with ROPS meeting the requirements of paragraphs (d) through (f) of this section, as appropriate, no later than the dates specified in paragraphs (1), (2), and (3) of this paragraph (c), unless an earlier date is required by an authorized representative of the Secretary under paragraph (c)(4) of this section:

(1) Mobile equipment manufactured between July 1, 1971, and September 1, 1974, shall be equipped with ROPS no later than March 1, 1975.

(2) Mobile equipment manufactured between July 1, 1970, and June 30, 1971, shall be equipped with ROPS no later than July 1, 1975.

(3) Mobile equipment manufactured between July 1, 1969, and June 30, 1970, shall be equipped with ROPS no later than January 1, 1976.

(4) Irrespective of the time periods specified in paragraph (c) (1) through (3) of this section an authorized representative of the Secretary may require such mobile equipment to be equipped with ROPS at an earlier date when necessary to protect the operator of the equipment under the conditions in which the mobile equipment is, or will be operated. The authorized representative of the Secretary shall in writing advise the operator that the equipment shall be equipped with a ROPS and shall fix a time within which the operator shall provide and install the ROPS. If such ROPS is not provided and installed within the time fixed a notice shall be issued to the operator pursuant to section 104 of the Act.

(5) Nothing in this § 77.403-1 shall preclude the issuance of a withdrawal order because of imminent danger.

(d) Except as provided in paragraph (e) of this section, mobile equipment described in paragraph (a) of this section, manufactured prior to September 1, 1974, shall be deemed in compliance with this section if the ROPS is installed in accordance with the recommendations of the ROPS manufacturer or designer. The coal mine operator shall exhibit certification from the ROPS manufacturer or designer in the form of a label attached to the equipment, indicating the manufacturer's or fabricator's name and address, the ROPS model number, if any, the machine make, model or series number that the structure is designed to fit, and compliance with the applicable specification listed in paragraph (c)(1) or (2) of this section, or he shall, upon request of the authorized representative of the Secretary, furnish certification from a registered professional engineer that:

(1) The ROPS complies with the Society of Automotive Engineers (SAE) Standard J 397, “Critical Zone—Characteristics and Dimensions for Operators of Construction and Industrial Machinery” or SAE J 397a, “Deflection Limiting Volume for Laboratory Evaluation of Rollover Protective Structures (ROPS) and Falling Object Protective Structures (FOPS) of Construction and Industrial Vehicles” and the following applicable SAE Standards:

(i) J 320a, “Minimum Performance Criteria for Rollover Protective Structure for Rubber-Tired Self-Propelled Scrapers” or J 320b, “Minimum Performance Criteria for Rollover Protective Structures for Prime Movers”; or

(ii) J 394, “Minimum Performance Criteria for Rollover Protective Structure for Rubber-Tired Front-End Loaders and Rubber-Tired Dozers” or J 394a, “Minimum Performance Criteria for Rollover Protective Structures for Wheeled Front-End Loaders and Wheeled Dozers”; or

(iii) J 395, “Minimum Performance Criteria for Rollover Protective Structure for Crawler Tractors and Crawler-Type Loaders” or J 395a, “Minimum Performance Criteria for Rollover Protective Structures for Track-Type Tractors and Track-Type Front-End Loaders”; or

(iv) J 396 or J 396a, “Minimum Performance Criteria for Rollover Protective Structures for Motor Graders”; or

(v) J 167, “Protective Frame with Overhead Protection—Test Procedures and Performance Requirements”; or

(vi) J 334a, “Protective Frame Test Procedures and Performance Requirements”; or

(2) The ROPS and supporting attachments will:

(i) Show satisfactory performance by actual test of a prototype involving a roll of 720° or more; or

(ii) Support not less than the weight of the vehicle applied as a uniformly distributed horizontal load at the top of the structure and perpendicular to a vertical plane through the longitudinal axis of the prime mover, and support two times the weight of the vehicle applied as a uniformly distributed vertical load to the top of the structure; 1 or

1 1Paragraph (d) of § 77.403-1 is based on the ROPS criteria of the U.S. Army Corps of Engineers, Safety—General Safety Requirements EM 385-1-1, Change 1, No. 21, Para. 18.A.20 (March 27, 1972), except that subparagraph (2)(ii) of this paragraph (d) is substituted for Para. 18.A.20e(2) of the Corps requirements.

(iii) Support the following separately applied minimum loads:

(A) 125 percent of the weight of the vehicle applied as a uniformly distributed horizontal load at the top of the ROPS and perpendicular to a critical plane through the longitudinal axis of the prime mover; and

(B) A load of twice the weight of the vehicle applied as a uniformly distributed vertical load to the top of the ROPS after complying with paragraph (d) (1) (iii) (A) of this section. Stresses shall not exceed the ultimate strength. Steel used in the ROPS must have capability to perform at 0 °F., or exhibit Charpy V-notch impact strength at 8 ft.-lb. at −20 °F. with a standard Charpy V-notch Type A specimen and provide 20 percent elongation over two inches in a standard two inch gauge length on a 0.505 inch diameter tensile specimen. Bolts and nuts shall be SAE grade 8 (reference SAE J 429d, J 429e, J 429f or J 429g and J 995, J 995a or J 995b).

(e) Mobile equipment manufactured prior to September 1, 1974 meeting certain existing governmental requirements for ROPS. Mobile equipment described in paragraph (a) of this section, manufactured prior to September 1, 1974 and already equipped with ROPS, shall be deemed in compliance with this section if it meets the ROPS requirements of the State of California, the U.S. Army Corps of Engineers, the Bureau of Reclamation of the U.S. Department of the Interior in effect on April 5, 1972, or the Occupational Safety and Health Administration, U.S. Department of Labor. The requirements in effect are:

(1) State of California: Construction Safety Orders 1591(i), 1596, and Logging and Sawmill Safety Order 5243, issued by the Department of Industrial Relations pursuant to Division 5, Labor Code § 6312, State of California;

(2) U.S. Army Corps of Engineers: Safety—General Safety Requirements, EM-385-1-1 (March 1967);

(3) Bureau of Reclamation, U.S. Department of the Interior: Safety and Health Regulations for Construction, Part II (September 1971); and

(4) Occupational Safety and Health Administration, U.S. Department of Labor: Safety and Health Regulations for Construction, 29 CFR 1926.1001 and 1926.1002.

(f) Field welding on ROPS shall be performed by welders who are certified by the coal mine operator or equipment distributor as being qualified in accordance with the American Welding Society Structural Welding Code AWS D1.1-73, or Military Standard MIL-STD 248, or the equivalent thereof.

(g) Seat belts required by § 77.1710(i) shall be worn by the operator of mobile equipment required to be equipped with ROPS by § 77.403-1.

(Sec. 101(a), Federal Coal Mine Health and Safety Act of 1969, as amended (83 Stat. 745; 30 U.S.C. 811(a))

[39 FR 24007, June 28, 1974. Redesignated and amended at 71 FR 16669, Apr. 3, 2006]

§ 77.403-2 Incorporation by reference.

In accordance with 5 U.S.C. 552(a), the publications to which references are made in §§ 77.403 and 77.403-1 and which have been prepared by organizations other than the Mine Safety and Health Administration (MSHA), are hereby incorporated by reference and made a part hereof. The incorporated publications are available at each MSHA Coal Mine Safety and Health district office of MSHA. The U.S. Army Corps of Engineers, Safety—General Safety Requirements and the Occupational Safety and Health Administration regulations are also available from the Information Dissemination (Superintendent of Documents), P.O. Box 371954, Pittsburgh, PA 15250-7954; Telephone: 866-512-1800 (toll free) or 202-512-1800; http://bookstore.gpo.gov. Bureau of Reclamation Safety and Health Regulations for Construction are available from the Bureau of Reclamation, Division of Safety, Engineering and Research Center, Denver, Colorado. SAE documents are available from the Society of Automotive Engineers, Inc., 400 Commonwealth Drive, Warrendale, PA 15096. American Welding Society Structural Welding Code D1-1-73 is available from the American Welding Society, Inc., 550 N.W. LeJeune Road, Miami, FL 33126. Military Standard MIL-STD 248 is available from the U.S. Government Printing Office, Washington, DC 20202.

(Sec. 101(a), the Federal Coal Mine Health and Safety Act of 1969, as amended (83 Stat. 745; 30 U.S.C. 811(a))

[39 FR 24008, June 28, 1974, as amended at 60 FR 35695, July 11, 1995. Redesignated and amended at 71 FR 16669, Apr. 3, 2006]

§ 77.404 Machinery and equipment; operation and maintenance.

(a) Mobile and stationary machinery and equipment shall be maintained in safe operating condition and machinery or equipment in unsafe condition shall be removed from service immediately.

(b) Machinery and equipment shall be operated only by persons trained in the use of and authorized to operate such machinery or equipment.

(c) Repairs or maintenance shall not be performed on machinery until the power is off and the machinery is blocked against motion, except where machinery motion is necessary to make adjustments.

(d) Machinery shall not be lubricated while in motion where a hazard exists, unless equipped with extended fittings or cups.

§ 77.405 Performing work from a raised position; safeguards.

(a) Men shall not work on or from a piece of mobile equipment in a raised position until it has been blocked in place securely. This does not preclude the use of equipment specifically designed as elevated mobile work platforms.

(b) No work shall be performed under machinery or equipment that has been raised until such machinery or equipment has been securely blocked in position.

§ 77.406 Drive belts.

(a) Drive belts shall not be shifted while in motion unless the machines are provided with mechanical shifters.

(b) Belt dressing shall not be applied while belts are in motion except where it can be applied without endangering a person.

§ 77.407 Power-driven pulleys.

(a) Belts, chains, and ropes shall not be guided onto power-driven moving pulleys, sprockets, or drums with the hands except on slow moving equipment especially designed for hand feeding.

(b) Pulleys of conveyors shall not be cleaned manually while the conveyor is in motion.

§ 77.408 Welding operations.

Welding operations shall be shielded and the area shall be well-ventilated.

§ 77.409 Shovels, draglines, and tractors.

(a) Shovels, draglines, and tractors shall not be operated in the presence of any person exposed to a hazard from its operation and all such equipment shall be provided with an adequate warning device which shall be sounded by the operator prior to starting operation.

(b) Shovels and draglines shall be equipped with handrails along and around all walkways and platforms.

§ 77.410 Mobile equipment; automatic warning devices.

(a) Mobile equipment such as front-end loaders, forklifts, tractors, graders, and trucks, except pickup trucks with an unobstructed rear view, shall be equipped with a warning device that—

(1) Gives an audible alarm when the equipment is put in reverse; or

(2) Uses infrared light, ultrasonic waves, radar, or other effective devices to detect objects or persons at the rear of the equipment, and sounds an audible alarm when a person or object is detected. This type of discriminating warning device shall—

(i) Have a sensing area of a sufficient size that would allow endangered persons adequate time to get out of the danger zone.

(ii) Give audible and visual alarms inside the operator's compartment and an audible alarm outside of the operator's compartment when a person or object is detected in the sensing area; and

(iii) When the equipment is put in reverse, activate and give a one-time audible and visual alarm inside the operator's compartment and a one-time audible alarm outside the operator's compartment.

(b) Alarms shall be audible above the surrounding noise levels.

(c) Warning devices shall be maintained in functional condition.

(d) An automatic reverse-activated strobe light may be substituted for an audible alarm when mobile equipment is operated at night.

[54 FR 30517, July 20, 1989]

§ 77.411 Compressed air and boilers; general.

All boilers and pressure vessels shall be constructed, installed, and maintained in accordance with the standards and specifications of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code.

§ 77.412 Compressed air systems.

(a) Compressors and compressed-air receivers shall be equipped with automatic pressure-relief valves, pressure gages, and drain valves.

(b) Repairs involving the pressure system of compressors, receivers, or compressed-air-powered equipment shall not be attempted until the pressure has been relieved from that part of the system to be repaired.

(c) At no time shall compressed air be directed toward a person. When compressed air is used, all necessary precautions shall be taken to protect persons from injury.

(d) Safety chains or suitable locking devices shall be used at connections to machines of high-pressure hose lines of 1-inch inside diameter or larger, and between high-pressure hose lines of 1-inch inside diameter or larger, where a connection failure would create a hazard.

§ 77.413 Boilers.

(a) Boilers shall be equipped with guarded, well-maintained water gages and pressure gages placed so that they can be observed easily. Water gages and pipe passages to the gages shall be kept clean and free of scale and rust.

(b) Boilers shall be equipped with automatic pressure-relief valves; valves shall be opened manually at least once a week to determine that they will function properly.

(c) Blowoff valves shall be piped outside the building and shall have outlets so located or protected that persons passing by, near, or under them will not be scalded.

(d) Boiler installations shall be provided with safety devices, acceptable to the Mine Safety and Health Administration, to protect against hazards of flameouts, fuel interruptions, and low-water level.

(e) Boilers shall be inspected internally at least once a year by a licensed inspector and a certificate of inspection signed by the inspector shall be displayed in the vicinity of the boiler.

Subpart F Electrical Equipment—General
§ 77.500 Electric power circuits and electric equipment; deenergization.

Power circuits and electric equipment shall be deenergized before work is done on such circuits and equipment, except when necessary for troubleshooting or testing.

§ 77.501 Electric distribution circuits and equipment; repair.

No electrical work shall be performed on electric distribution circuits or equipment, except by a qualified person or by a person trained to perform electrical work and to maintain electrical equipment under the direct supervision of a qualified person. Disconnecting devices shall be locked out and suitably tagged by the persons who perform such work, except that in cases where locking out is not possible, such devices shall be opened and suitably tagged by such persons. Locks or tags shall be removed only by the persons who installed them or, if such persons are unavailable, by persons authorized by the operator or his agent.

§ 77.501-1 Qualified person.

A qualified person within the meaning of § 77.501 is an individual who meets the requirements of § 77.103.

§ 77.502 Electric equipment; examination, testing, and maintenance.

Electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept.

§ 77.502-1 Qualified person.

A qualified person within the meaning of § 77.502 is an individual who meets the requirements of § 77.103.

§ 77.502-2 Electric equipment; frequency of examination and testing.

The examinations and tests required under the provision of this § 77.502 shall be conducted at least monthly.

§ 77.503 Electric conductors; capacity and insulation.

Electric conductors shall be sufficient in size and have adequate current carrying capacity and be of such construction that a rise in temperature resulting from normal operation will not damage the insulating materials.

§ 77.503-1 Electric conductors.

Electric conductors shall be sufficient in size to meet the minimum current carrying capacity provided for in the National Electric Code, 1968. All trailing cables shall meet the minimum requirements for ampacity provided in the standards of the Insulated Power Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are purchased.

§ 77.504 Electrical connections or splices; suitability.

Electrical connections or splices in electric conductors shall be mechanically and electrically efficient, and suitable connectors shall be used. All electrical connections or splices in insulated wire shall be reinsulated at least to the same degree of protection as the remainder of the wire.

§ 77.505 Cable fittings; suitability.

Cables shall enter metal frames of motors, splice boxes, and electric compartments only through proper fittings. When insulated wires, other than cables, pass through metal frames, the holes shall be substantially bushed with insulated bushings.

§ 77.506 Electric equipment and circuits; overload and short-circuit protection.

Automatic circuit-breaking devices or fuses of the correct type and capacity shall be installed so as to protect all electric equipment and circuits against short circuit and overloads.

§ 77.506-1 Electric equipment and circuits; overload and short circuit protection; minimum requirements.

Devices providing either short circuit protection or protection against overload shall conform to the minimum requirements for protection of electric circuits and equipment of the National Electric Code, 1968.

§ 77.507 Electric equipment; switches.

All electric equipment shall be provided with switches or other controls that are safely designed, constructed, and installed.

§ 77.508 Lightning arresters, ungrounded and exposed power conductors and telephone wires.

All ungrounded, exposed power conductors and telephone wires shall be equipped with suitable lightning arresters which are adequately installed and connected to a low resistance grounding medium.

§ 77.508-1 Lightning arresters; wires entering buildings.

Lightning arresters protecting exposed telephone wires entering buildings shall be provided at the point where each such telephone wire enters the building.

§ 77.509 Transformers; installation and guarding.

(a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence at least 6 feet high and at least 3 feet from any energized parts, casings, or wiring.

(b) Transformer stations shall be enclosed to prevent persons from unintentionally or inadvertently contacting energized parts.

(c) Transformer enclosures shall be kept locked against unauthorized entry.

§ 77.510 Resistors; location and guarding.

Resistors, heaters, and rheostats shall be located so as to minimize fire hazards and, where necessary, provided with guards to prevent personal contact.

§ 77.511 Danger signs at electrical installations.

Suitable danger signs shall be posted at all major electrical installations.

§ 77.512 Inspection and cover plates.

Inspection and cover plates on electrical equipment shall be kept in place at all times except during testing or repairs.

§ 77.513 Insulating mats at power switches.

Dry wooden platforms, insulating mats, or other electrically nonconductive material shall be kept in place at all switchboards and power-control switches where shock hazards exist. However, metal plates on which a person normally would stand and which are kept at the same potential as the grounded, metal, non-current-carrying parts of the power switches to be operated may be used.

§ 77.514 Switchboards; passageways and clearance.

Switchboards shall be installed to provide passageways or lanes of travel which permit access to the back of the switchboard from both ends for inspection, adjustment or repair. Openings permitting access to the rear of any switchboard shall be guarded, except where they are located in buildings which are kept locked.

§ 77.515 Bare signal or control wires; voltage.

The voltage on bare signal or control wires accessible to personal contact shall not exceed 40 volts.

§ 77.516 Electric wiring and equipment; installation and maintenance.

In addition to the requirements of §§ 77.503 and 77.506, all wiring and electrical equipment installed after June 30, 1971, shall meet the requirements of the National Electric Code in effect at the time of installation.

Subpart G Trailing Cables
§ 77.600 Trailing cables; short-circuit protection; disconnecting devices.

Short-circuit protection for trailing cables shall be provided by an automatic circuit breaker or other no less effective device, approved by the Secretary, of adequate current-interrupting capacity in each ungrounded conductor. Disconnecting devices used to disconnect power from trailing cables shall be plainly marked and identified and such devices shall be equipped or designed in such a manner that it can be determined by visual observation that the power is disconnected.

§ 77.601 Trailing cables or portable cables; temporary splices.

Temporary splices in trailing cables or portable cables shall be made in a workmanlike manner and shall be mechanically strong and well insulated. Trailing cables or portable cables with exposed wires or splices that heat or spark under load shall not be used.

§ 77.602 Permanent splicing of trailing cables.

When permanent splices in trailing cables are made, they shall be:

(a) Mechanically strong with adequate electrical conductivity;

(b) Effectively insulated and sealed so as to exclude moisture; and,

(c) Vulcanized or otherwise made with suitable materials to provide good bonding to the outer jacket.

§ 77.603 Clamping of trailing cables to equipment.

Trailing cables shall be clamped to machines in a manner to protect the cables from damage and to prevent strain on the electrical connections.

§ 77.604 Protection of trailing cables.

Trailing cables shall be adequately protected to prevent damage by mobile equipment.

§ 77.605 Breaking trailing cable and power cable connections.

Trailing cable and power cable connections between cables and to power sources shall not be made or broken under load.

§ 77.606 Energized trailing cables; handling.

Energized medium- and high-voltage trailing cables shall be handled only by persons wearing protective rubber gloves (see § 77.606-1) and, with such other protective devices as may be necessary and appropriate under the circumstances.

§ 77.606-1 Rubber gloves; minimum requirements.

(a) Rubber gloves (lineman's gloves) worn while handling high-voltage trailing cables shall be rated at least 20,000 volts and shall be used and tested in accordance with the provisions of §§ 77.704-6 through 77.704-8.

(b) Rubber gloves (wireman's gloves) worn while handling trailing cables energized by 660 to 1,000 volts shall be rated at least 1,000 volts and shall not be worn inside out or without protective leather gloves.

(c) Rubber gloves shall be inspected for defects before use on each shift and at least once thereafter during the shift when such rubber gloves are used for extended periods. All protective rubber gloves which contain defects shall be discarded and replaced prior to handling energized cables.

Subpart H Grounding
§ 77.700 Grounding metallic sheaths, armors, and conduits enclosing power conductors.

Metallic sheaths, armors, and conduits enclosing power conductors shall be electrically continuous throughout and shall be grounded by methods approved by an authorized representative of the Secretary.

§ 77.700-1 Approved methods of grounding.

Metallic sheaths, armors, and conduits in resistance grounded systems, where the enclosed conductors are a part of the system, will be approved if a solid connection is made to the neutral conductor; in all other systems, the following methods of grounding will be approved:

(a) A solid connection to metal waterlines having low resistance to earth;

(b) A solid connection to a grounding conductor, other than the neutral conductor of a resistance grounded system, extending to a low-resistance ground field;

(c) Any other method of grounding, approved by an authorized representative of the Secretary, which ensures that there is no difference in potential between such metallic enclosures and the earth.

§ 77.701 Grounding metallic frames, casings, and other enclosures of electric equipment.

Metallic frames, casings, and other enclosures of electric equipment that can become “alive” through failure of insulation or by contact with energized parts shall be grounded by methods approved by an authorized representative of the Secretary.

§ 77.701-1 Approved methods of grounding of equipment receiving power from ungrounded alternating current power systems.

For purposes of grounding metallic frames, casings and other enclosures of equipment receiving power from ungrounded alternating current power systems, the following methods of grounding will be approved:

(a) A solid connection between the metallic frame; casing, or other metal enclosure and the grounded metallic sheath, armor, or conduit enclosing the power conductor feeding the electric equipment enclosed;

(b) A solid connection to metal waterlines having low resistance to earth;

(c) A solid connection to a grounding conductor extending to a low-resistance ground field; and,

(d) Any other method of grounding, approved by an authorized representative of the Secretary, which insures that there is no difference in potential between such metal enclosures and the earth.

§ 77.701-2 Approved methods of grounding metallic frames, casings, and other enclosures of electric equipment receiving power from a direct-current power system.

(a) The following methods of grounding metallic frames, casings, and other enclosures of electric equipment receiving power from a direct-current power system with one polarity grounded will be approved:

(1) A solid connection to the grounded power conductor of the system; and,

(2) Any other method, approved by an authorized representative of the Secretary, which insures that there is no difference in potential between such metal enclosures and the earth.

(b) A method of grounding of metallic frames, casings, and other enclosures of electric equipment receiving power from a direct-current power system other than a system with one polarity grounded, will be approved by an authorized representative of the Secretary if the method insures that there is no difference in potential between such frames, casings, and other enclosures, and the earth.

§ 77.701-3 Grounding wires; capacity.

Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will be approved if:

(a) Where the power conductor used is No. 6 A.W.G., or larger, the cross-sectional area of the grounding wire is at least one-half the cross-sectional area of the power conductor.

(b) Where the power conductor used is less than No. 6 A.W.G., the cross-sectional area of the grounding wire is equal to the cross-sectional area of the power conductor.

§ 77.701-4 Use of grounding connectors.

If ground wires are attached to grounded power conductors, separate clamps, suitable for such purpose, shall be used and installed to provide a solid connection.

§ 77.702 Protection other than grounding.

Methods other than grounding which provide no less effective protection may be permitted by the Secretary or his authorized representative. Such methods may not be used unless so approved.

§ 77.703 Grounding frames of stationary high-voltage equipment receiving power from ungrounded delta systems.

The frames of all stationary high-voltage equipment receiving power from ungrounded delta systems shall be grounded by methods approved by an authorized representative of the Secretary.

§ 77.703-1 Approved methods of grounding.

The methods of grounding stated in § 77.701-1 will be approved with respect to the grounding of frames of high-voltage equipment referred to in § 77.703.

§ 77.704 Work on high-voltage lines; deenergizing and grounding.

High-voltage lines shall be deenergized and grounded before work is performed on them, except that repairs may be permitted on energized high-voltage lines if (a) such repairs are made by a qualified person in accordance with procedures and safeguards set forth in §§ 77.704-1 through 77.704-11 of this Subpart H as applicable, and (b) the operator has tested and properly maintained the protective devices necessary in making such repairs.

§ 77.704-1 Work on high-voltage lines.

(a) No high-voltage line shall be regarded as deenergized for the purpose of performing work on it, until it has been determined by a qualified person (as provided in § 77.103) that such high-voltage line has been deenergized and grounded. Such qualified person shall by visual observation (1) determine that the disconnecting devices on the high-voltage circuit are in open position, and (2) insure that each ungrounded conductor of the high-voltage circuit upon which work is to be done is properly connected to the system grounding medium. In the case of resistance grounded or solid wye-connected systems, the neutral wire is the system grounding medium. In the case of an ungrounded power system, either the steel armor or conduit enclosing the system or a surface grounding field is a system grounding medium;

(b) No work shall be performed on any high-voltage line which is supported by any pole or structure which also supports other high-voltage lines until: (1) All lines supported on the pole or structure are deenergized and grounded in accordance with all of the provisions of this § 77.704-1 which apply to the repair of deenergized surface high-voltage lines; or (2) the provisions of §§ 77.704-2 through 77.704-10 have been complied with, with respect to all energized lines, which are supported on the pole or structure.

(c) Work may be performed on energized surface high-voltage lines only in accordance with the provisions of §§ 77.704-2 through 77.704-10, inclusive.

§ 77.704-2 Repairs to energized high-voltage lines.

An energized high-voltage line may be repaired only when:

(a) The operator has determined that,

(1) Such repairs cannot be scheduled during a period when the power circuit could be properly deenergized and grounded;

(2) Such repairs will be performed on power circuits with a phase-to-phase nominal voltage no greater than 15,000 volts;

(3) Such repairs on circuits with a phase-to-phase nominal voltage of 5,000 volts or more will be performed only with the use of live line tools; and,

(4) Weather conditions will not interfere with such repairs or expose those persons assigned to such work to an imminent danger; and,

(b) The operator has designated a person qualified under the provisions of § 77.104 as the person responsible for carrying out such repairs and such person, in order to ensure protection for himself and other qualified persons assigned to perform such repairs from the hazards of such repair, has prepared and filed with the operator:

(1) A general description of the nature and location of the damage or defect to be repaired;

(2) The general plan to be followed in making such repairs;

(3) A statement that a briefing of all qualified persons assigned to make such repairs was conducted informing them of the general plan, their individual assignments, and the dangers inherent in such assignments;

(4) A list of the proper protective equipment and clothing that will be provided; and

(5) Such other information as the person designated by the operator feels necessary to describe properly the means or methods to be employed in such repairs.

§ 77.704-3 Work on energized high-voltage surface lines; reporting.

Any operator designating and assigning qualified persons to perform repairs on energized high-voltage surface lines under the provisions of § 77.704-2 shall maintain a record of such repairs. Such record shall contain a notation of the time, date, location, and general nature of the repairs made together with a copy of the information filed with the operator by the qualified person designated as responsible for performing such repairs.

§ 77.704-4 Simultaneous repairs.

When two or more persons are working on an energized high-voltage surface line simultaneously, and any one of them is within reach of another, such persons shall not be allowed to work on different phases or on equipment with different potentials.

§ 77.704-5 Installation of protective equipment.

Before repair work on energized high-voltage surface lines is begun, protective equipment shall be used to cover all bare conductors, ground wires, guys, telephone lines, and other attachments in proximity to the area of planned repairs. Such protective equipment shall be installed from a safe position below the conductors or other apparatus being covered. Each rubber protective device employed in the making of repairs shall have a dielectric strength of 20,000 volts, or more.

§ 77.704-6 Protective clothing; use and inspection.

All persons performing work on energized high-voltage surface lines shall wear protective rubber lineman's gloves, sleeves, and climber guards if climbers are worn. Protective rubber gloves shall not be worn wrong side out or without protective leather gloves. Protective devices worn by a person assigned to perform repairs on high-voltage surface lines shall be worn continuously from the time he leaves the ground until he returns to the ground and, if such devices are employed for extended periods, such person shall visually inspect the equipment assigned him for defects before each use and, in no case, less than twice each day.

§ 77.704-7 Protective equipment; inspection.

Each person shall visually inspect protective equipment and clothing provided him in connection with work on high-voltage surface lines before using such equipment and clothing, and any equipment or clothing containing any defect or damage shall be discarded and replaced with proper protective equipment or clothing prior to the performance of any electrical work on such lines.

§ 77.704-8 Protective equipment; testing and storage.

(a) All rubber protective equipment used on work on energized high-voltage surface lines shall be electrically tested by the operator in accordance with ASTM standards, Part 28, published February 1968, and such testing shall be conducted in accordance with the following schedule:

(1) Rubber gloves, once each month;

(2) Rubber sleeves, once every 3 months;

(3) Rubber blankets, once every 6 months;

(4) Insulator hoods and line hose, once a year; and

(5) Other electric protective equipment, once a year.

(b) Rubber gloves shall not be stored wrong side out. Blankets shall be rolled when not in use, and line hose, and insulator hoods shall be stored in their natural position and shape.

§ 77.704-9 Operating disconnecting or cutout switches.

Disconnecting or cutout switches on energized high-voltage surface lines shall be operated only with insulated sticks, fuse tongs, or pullers which are adequately insulated and maintained to protect the operator from the voltage to which he is exposed. When such switches are operated from the ground, the person using such devices shall wear protective rubber lineman's gloves, except where such switches are bonded to a metal mat as provided in § 77.513.

§ 77.704-10 Tying into energized high-voltage surface circuits.

If the work of forming an additional circuit by tying into an energized high-voltage surface line is performed from the ground, any person performing such work must wear and employ all of the protective equipment and clothing required under the provisions of §§ 77.704-5 and 77.704-6. In addition, the insulated stick used by such person must have been designed for such purpose and must be adequately insulated and be maintained to protect such person from the voltage to which he is exposed.

§ 77.704-11 Use of grounded messenger wires; ungrounded systems.

Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems may be used as a grounding medium.

§ 77.705 Guy wires; grounding.

Guy wires from poles supporting high-voltage transmission lines shall be securely connected to the system ground or be provided with insulators installed near the pole end.

Subpart I Surface High-Voltage Distribution
§ 77.800 High-voltage circuits; circuit breakers.

High-voltage circuits supplying power to portable or mobile equipment shall be protected by suitable circuit breakers of adequate interrupting capacity which are properly tested and maintained and equipped with devices to provide protection against under voltage, grounded phase, short circuit and overcurrent. High-voltage circuits supplying power to stationary equipment shall be protected against overloads by either a circuit breaker or fuses of the correct type and capacity.

§ 77.800-1 Testing, examination, and maintenance of circuit breakers; procedures.

(a) Circuit breakers and their auxiliary devices protecting high-voltage circuits to portable or mobile equipment shall be tested and examined at least once each month by a person qualified as provided in § 77.103.

(b) Tests shall include:

(1) Breaking continuity of the ground check conductor where ground check monitoring is used; and,

(2) Actuating any of the auxiliary protective relays.

(c) Examination shall include visual observation of all components of the circuit breaker and its auxiliary devices, and such repairs or adjustments as are indicated by such tests and examinations shall be carried out immediately.

§ 77.800-2 Testing, examination, and maintenance of circuit breakers; record.

The operator shall maintain a written record of each test, examination, repair, or adjustment of all circuit breakers protecting high-voltage circuits. Such record shall be kept in a book approved by the Secretary.

§ 77.801 Grounding resistors.

The grounding resistor, where required, shall be of the proper ohmic value to limit the voltage drop in the grounding circuit external to the resistor to not more than 100 volts under fault conditions. The grounding resistor shall be rated for maximum fault current continuously and insulated from ground for a voltage equal to the phase-to-phase voltage of the system.

§ 77.801-1 Grounding resistors; continuous current rating.

The ground fault current rating of grounding resistors shall meet the “extended time rating” set forth in American Institute of Electrical Engineers, Standard No. 32.

§ 77.802 Protection of high-voltage circuits; neutral grounding resistors; disconnecting devices.

High-voltage circuits supplying portable or mobile equipment shall contain either a direct or derived neutral which shall be grounded through a suitable resistor at the source transformers, and a grounding circuit, originating at the grounded side of the grounding resistor, shall extend along with the power conductors and serve as a grounding conductor for the frames of all high-voltage equipment supplied power from that circuit, except that the Secretary or his authorized representative may permit other high-voltage circuits to feed stationary electrical equipment, if he finds that such exception will not pose a hazard to the miners. Disconnecting devices shall be installed and so equipped or designed in such a manner that it can be determined by visual observation that the power is disconnected.

§ 77.803 Fail safe ground check circuits on high-voltage resistance grounded systems.

On and after September 30, 1971, all high-voltage, resistance grounded systems shall include a fail safe ground check circuit or other no less effective device approved by the Secretary to monitor continuously the grounding circuit to assure continuity. The fail safe ground check circuit shall cause the circuit breaker to open when either the ground or ground check wire is broken.

§ 77.803-1 Fail safe ground check circuits; maximum voltage.

The maximum voltage used for ground check circuits under § 77.803 shall not exceed 96 volts.

§ 77.803-2 Ground check systems not employing pilot check wires; approval by the Secretary.

Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system includes a fail safe design which will cause the circuit interrupter to open when ground continuity is broken.

§ 77.804 High-voltage trailing cables; minimum design requirements.

(a) High-voltage trailing cables used in resistance grounded systems shall be equipped with metallic shields around each power conductor with one or more ground conductors having a total cross-sectional area of not less than one-half the power conductor, and with an insulated conductor for the ground continuity check circuit. External ground check conductors may be used if they are not smaller than No. 8 (AWG) and have an insulation rated at least 600 volts.

(b) All such high-voltage trailing cables shall be adequate for the intended current and voltage. Splices made in such cables shall provide continuity of all components.

§ 77.805 Cable couplers and connection boxes; minimum design requirements.

(a)(1) Couplers that are used in medium- or high-voltage power circuits shall be of the three-phase type and enclosed in a full metallic shell, except that the Secretary may permit, under such guidelines as he may prescribe, no less effective couplers constructed of materials other than metal.

(2) Cable couplers shall be adequate for the intended current and voltage.

(3) Cable couplers with any metal exposed shall be grounded to the ground conductor in the cable.

(4) Couplers shall be constructed to cause the ground check continuity conductor to break first and the ground conductor last when being uncoupled when pilot check circuits are used.

(b) Cable connection boxes shall be of substantial construction and designed to guard all energized parts from personal contact.

§ 77.806 Connection of single-phase loads.

Single-phase loads, such as transformer primaries, shall be connected phase to phase in resistance grounded systems.

§ 77.807 Installation of high-voltage transmission cables.

High-voltage transmission cables shall be installed or placed so as to afford protection against damage. They shall be placed to prevent contact with low-voltage or communication circuits.

§ 77.807-1 High-voltage powerlines; clearances above ground.

High-voltage powerlines located above driveways, haulageways, and railroad tracks shall be installed to provide the minimum vertical clearance specified in National Electrical Safety Code: Provided, however, That in no event shall any high-voltage powerline be installed less than 15 feet above ground.

§ 77.807-2 Booms and masts; minimum distance from high-voltage lines.

The booms and masts of equipment operated on the surface of any coal mine shall not be operated within 10 feet of an energized overhead powerline. Where the voltage of overhead powerlines is 69,000 volts, or more, the minimum distance from the boom or mast shall be as follows:

Nominal power line voltage (in 1,000 volts) | Minimum distance (feet)

69 to 114 | 12

115 to 229 | 15

230 to 344 | 20

345 to 499 | 25

500 or more | 35

§ 77.807-3 Movement of equipment; minimum distance from high-voltage lines.

When any part of any equipment operated on the surface of any coal mine is required to pass under or by any energized high-voltage powerline and the clearance between such equipment and powerline is less than that specified in § 77.807-2 for booms and masts, such powerlines shall be deenergized or other precautions shall be taken.

§ 77.808 Disconnecting devices.

Disconnecting devices shall be installed at the beginning of each branch line in high-voltage circuits and they shall be equipped or designed in such a manner that it can be determined by visual observation that the circuit is deenergized when such devices are open.

§ 77.809 Identification of circuit breakers and disconnecting switches.

Circuit breakers and disconnecting switches shall be labeled to show which units they control, unless identification can be made readily by location.

§ 77.810 High-voltage equipment; grounding.

Frames, supporting structures, and enclosures of stationary, portable, or mobile high-voltage equipment shall be effectively grounded.

§ 77.811 Movement of portable substations and transformers.

Portable substations and transformers shall be deenergized before they are moved from one location to another.

Subpart J Low- and Medium-Voltage Alternating Current Circuits
§ 77.900 Low- and medium-voltage circuits serving portable or mobile three-phase alternating current equipment; circuit breakers.

Low- and medium-voltage circuits supplying power to portable or mobile three-phase alternating current equipment shall be protected by suitable circuit breakers of adequate interrupting capacity which are properly tested and maintained and equipped with devices to provide protection against undervoltage, grounded phase, short circuit, and over-current.

§ 77.900-1 Testing, examination, and maintenance of circuit breakers; procedures.

Circuit breakers protecting low- and medium-voltage circuits serving portable or mobile three-phase alternating current equipment and their auxiliary devices shall be tested and examined at least once each month by a person qualified as provided in § 77.103. In performing such tests, the circuit breaker auxiliaries or control circuits shall be actuated in any manner which causes the circuit breaker to open. All components of the circuit breaker and its auxiliary devices shall be visually examined and such repairs or adjustments as are indicated by such tests and examinations shall be carried out immediately.

§ 77.900-2 Testing, examination, and maintenance of circuit breakers; record.

The operator shall maintain a written record of each test, examination, repair or adjustment of all circuit breakers protecting low- and medium-voltage circuits serving three-phase alternating current equipment and such record shall be kept in a book approved by the Secretary.

§ 77.901 Protection of low- and medium-voltage three-phase circuits.

(a) Low- and medium-voltage circuits supplying power to portable or mobile three-phase alternating equipment shall contain:

(1) Either a direct or derived neutral grounded through a suitable resistor at the power source;

(2) A grounding circuit originating at the grounded side of the grounding resistor which extends along with the power conductors and serves as a grounding conductor for the frames of all the electric equipment supplied power from the circuit.

(b) Grounding resistors, where required, shall be of an ohmic value which limits the ground fault current to no more than 25 amperes. Such grounding resistors shall be rated for maximum fault current continuously and provide insulation from ground for a voltage equal to the phase-to-phase voltage of the system.

(c) Low- and medium-voltage circuits supplying power to three-phase alternating current stationary electric equipment shall comply with the National Electric Code.

§ 77.901-1 Grounding resistor; continuous current rating.

The ground fault current rating of grounding resistors shall meet the “extended time rating” set forth in American Institute of Electrical Engineers Standard No. 32.

§ 77.902 Low- and medium-voltage ground check monitor circuits.

On and after September 30, 1971, three-phase low- and medium-voltage resistance grounded systems to portable and mobile equipment shall include a fail safe ground check circuit or other no less effective device approved by the Secretary to monitor continuously the grounding circuit to assure continuity. The fail safe ground check circuit shall cause the circuit breaker to open when either the ground or pilot check wire is broken. Cable couplers shall be constructed to cause the ground check continuity conductor to break first and the ground conductor last when being uncoupled when pilot check circuits are used.

§ 77.902-1 Fail safe ground check circuits; maximum voltage.

The maximum voltage used for ground check circuits under § 77.902 shall not exceed 40 volts.

§ 77.902-2 Approved ground check systems not employing pilot check wires.

Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the system includes a fail safe design causing the circuit breaker to open when ground continuity is broken.

§ 77.902-3 Attachment of ground conductors and ground check wires to equipment frames; use of separate connections.

In grounding the frames of stationary, portable, or mobile equipment receiving power from resistance grounded systems, separate connections shall be used.

§ 77.903 Disconnecting devices.

Disconnecting devices shall be installed in circuits supplying power to portable or mobile equipment and shall provide visual evidence that the power is disconnected.

§ 77.904 Identification of circuit breakers.

Circuit breakers shall be labeled to show which circuits they control unless identification can be made readily by location.

§ 77.905 Connection of single-phase loads.

Single-phase loads shall be connected phase-to-phase in resistance grounded systems.

§ 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires.

On and after September 30, 1971, all trailing cables supplying power to portable or mobile equipment from low-voltage three-phase resistance grounded power systems shall contain one or more ground conductors having a cross-sectional area of not less than one-half the power conductor. Such trailing cables shall include an insulated conductor for the ground continuity check circuit except where a no less effective device has been approved by the Secretary to assure continuity. Splices made in low-voltage trailing cables shall provide continuity of all components.

Subpart K Ground Control
§ 77.1000 Highwalls, pits and spoil banks; plans.

Each operator shall establish and follow a ground control plan for the safe control of all highwalls, pits and spoil banks to be developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure safe working conditions. The mining methods employed by the operator shall be selected to insure highwall and spoil bank stability.

§ 77.1000-1 Filing of plan.

The operator shall file a copy of such plan, and revisions thereof, with the MSHA Coal Mine Safety and Health district office for the district in which the mine is located, and shall identify the name and location of the mine; the Mine Safety and Health Administration identification number if known; and the name and address of the mine operator.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995; 71 FR 16669, Apr. 3, 2006]

§ 77.1001 Stripping; loose material.

Loose hazardous material shall be stripped for a safe distance from the top of pit or highwalls, and the loose unconsolidated material shall be sloped to the angle of repose, or barriers, baffle boards, screens, or other devices be provided that afford equivalent protection.

§ 77.1002 Box cuts; spoil material placement.

When box cuts are made, necessary precautions shall be taken to minimize the possibility of spoil material rolling into the pit.

§ 77.1003 Benches.

To insure safe operation, the width and height of benches shall be governed by the type of equipment to be used and the operation to be performed.

§ 77.1004 Ground control; inspection and maintenance; general.

(a) Highwalls, banks, benches, and terrain sloping into the working areas shall be examined after every rain, freeze, or thaw before men work in such areas, and such examination shall be made and recorded in accordance with § 77.1713.

(b) Overhanging highwalls and banks shall be taken down and other unsafe ground conditions shall be corrected promptly, or the area shall be posted.

§ 77.1005 Scaling highwalls; general.

(a) Hazardous areas shall be scaled before any other work is performed in the hazardous area. When scaling of highwalls is necessary to correct conditions that are hazardous to persons in the area, a safe means shall be provided for performing such work.

(b) Whenever it becomes necessary for safety to remove hazardous material from highwalls by hand, the hazardous material shall be approached from a safe direction and the material removed from a safe location.

§ 77.1006 Highwalls; men working.

(a) Men, other than those necessary to correct unsafe conditions, shall not work near or under dangerous highwalls or banks.

(b) Except as provided in paragraph (c) of this section, men shall not work between equipment and the highwall or spoil bank where the equipment may hinder escape from falls or slides.

(c) Special safety precautions shall be taken when men are required to perform repair work between immobilized equipment and the highwall or spoil bank and such equipment may hinder escape from falls or slides.

§ 77.1007 Drilling; general.

(a) Equipment that is to be used during a shift shall be inspected each shift by a competent person. Equipment defects affecting safety shall be reported.

(b) Equipment defects affecting safety shall be corrected before the equipment is used.

§ 77.1008 Relocation of drills; safeguards.

(a) When a drill is being moved from one drilling area to another, drill steel, tools, and other equipment shall be secured and the mast placed in a safe position.

(b) When a drill helper is used his location shall be made known to the operator at all times when the drill is being moved.

§ 77.1009 Drill; operation.

(a) While in operation drills shall be attended at all times.

(b) Men shall not drill from positions that hinder their access to the control levers, or from insecure footing or staging, or from atop equipment not designed for this purpose.

(c) Men shall not be on a mast while the drill bit is in operation unless a safe platform is provided and safety belts are used.

(d) Drill crews and others shall stay clear of augers or drill stems that are in motion. Persons shall not pass under or step over a moving stem or auger.

(e) In the event of power failure, drill controls shall be placed in the neutral position until power is restored.

(f) When churn drills or vertical rotary drills are used, drillers shall not be permitted to work under suspended tools, and when collaring holes, inspecting, or during any operation in which tools are removed from the hole, all tools shall be lowered to the ground or platform.

§ 77.1010 Collaring holes.

(a) Starter steels shall be used when collaring holes with hand-held drills.

(b) Men shall not hold the drill steel while collaring holes, or rest their hands on the chuck or centralizer while drilling.

§ 77.1011 Drill holes; guarding.

Drill holes large enough to constitute a hazard shall be covered or guarded.

§ 77.1012 Jackhammers; operation; safeguards.

Men operating or working near jackhammers or jackleg drills, or other drilling machines shall position themselves so that they will not be struck or lose their balance if the drill steel breaks or sticks.

§ 77.1013 Air drills; safeguards.

Air shall be turned off and bled from the air hoses before hand-held air drills are moved from one working area to another.

Subpart L Fire Protection
§ 77.1100 Fire protection; training and organization.

Firefighting facilities and equipment shall be provided commensurate with the potential fire hazards at each structure, enclosure and other facility (including custom coal preparation) at the mine and the employees at such facilities shall be instructed and trained annually in the use of such firefighting facilities and equipment.

§ 77.1101 Escape and evacuation; plan.

(a) Before September 30, 1971, each operator of a mine shall establish and keep current a specific escape and evacuation plan to be followed in the event of a fire.

(b) All employees shall be instructed on current escape and evacuation plans, fire alarm signals, and applicable procedures to be followed in case of fire.

(c) Plans for escape and evacuation shall include the designation and proper maintenance of adequate means for exit from all areas where persons are required to work or travel including buildings and equipment and in areas where persons normally congregate during the work shift.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971; 60 FR 33723, June 29, 1995]

§ 77.1102 Warning signs; smoking and open flame.

Signs warning against smoking and open flames shall be posted so they can be readily seen in areas or places where fire or explosion hazards exist.

§ 77.1103 Flammable liquids; storage.

(a) Flammable liquids shall be stored in accordance with standards of the National Fire Protection Association. Small quantities of flammable liquids drawn from storage shall be kept in properly identified safety cans.

(b) Unburied flammable-liquid storage tanks shall be mounted securely on firm foundations. Outlet piping shall be provided with flexible connections or other special fittings to prevent adverse effects from tank settling.

(c) Fuel lines shall be equipped with valves to cut off fuel at the source and shall be located and maintained to minimize fire hazards.

(d) Areas surrounding flammable-liquid storage tanks and electric substations and transformers shall be kept free from grass (dry), weeds, underbrush, and other combustible materials such as trash, rubbish, leaves and paper, for at least 25 feet in all directions.

§ 77.1104 Accumulations of combustible materials.

Combustible materials, grease, lubricants, paints, or flammable liquids shall not be allowed to accumulate where they can create a fire hazard.

§ 77.1105 Internal combustion engines; fueling.

Internal combustion engines, except diesels, shall be shut off and stopped before being fueled.

§ 77.1106 Battery-charging stations; ventilation.

Battery-charging stations shall be located in well-ventilated areas. Battery-charging stations shall be equipped with reverse current protection where such stations are connected directly to direct current power systems.

§ 77.1107 Belt conveyors.

Belt conveyors in locations where fire would create a hazard to personnel shall be provided with switches to stop the drive pulley automatically in the event of excessive slippage.

§ 77.1108 Firefighting equipment; requirements; general.

On and after September 30, 1971, each operator of a coal mine shall provide an adequate supply of firefighting equipment which is adapted to the size and suitable for use under the conditions present on the surface at the mine.

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971]

§ 77.1108-1 Type and capacity of firefighting equipment.

Firefighting equipment required under this § 77.1108 shall meet the following minimum requirements:

(a) Waterlines. Waterlines shall be capable of delivering 50 gallons of water a minute at a nozzle pressure of 50 pounds per square inch. Where storage tanks are used as a source of water supply, the tanks shall be of 1,000-gallon capacity for each 1,000 tons of coal processed (average) per shift.

(b) Fire extinguishers. Fire extinguishers shall be:

(1) Of the appropriate type for the particular fire hazard involved;

(2) Adequate in number and size for the particular fire hazard involved;

(3) Replaced immediately with fully charged extinguishers after any discharge is made from an extinguisher; and

(4) Approved by the Underwriter's Laboratories, Inc., or the Factory Mutual Research Corp., or other competent testing agency acceptable to the Mine Safety and Health Administration.

(c) Fire hose. Fire hose and couplings shall meet the requirements of the Underwriter's Laboratories, Inc., or Factory Mutual Research Corp.'s specifications. Cotton or cotton-polyester jacketed hose shall be treated in accordance with the U.S. Department of Agriculture Forest Service Specification 182 for mildew resistance. The water pressure at the hose nozzle shall not be excessively high so as to present a hazard to the nozzle operator.

[36 FR 9364, May 22, 1971, as amended at 47 FR 28096, June 29, 1982]

§ 77.1109 Quantity and location of firefighting equipment.

Preparation plants, dryer plants, tipples, drawoff tunnels, shops, and other surface installations shall be equipped with the following firefighting equipment.

(a) Each structure presenting a fire hazard shall be provided with portable fire extinguishers commensurate with the potential fire hazard at the structure in accordance with the recommendations of the National Fire Protection Association.

(b) Preparation plants shall be equipped with waterlines, with outlet valves on each floor, and with sufficient fire hose to project a water stream to any point in the plant. However, where freezing conditions exist or water is not available, a 125-pound multipurpose dry powder extinguisher may be substituted for the purposes of this paragraph (b) for each 2,500 square feet of floor space in a wooden or other flammable structure, or for each 5,000 square feet of floor space in a metal, concrete-block, or other type of non-flammable construction.

(c)(1) Mobile equipment, including trucks, front-end loaders, bulldozers, portable welding units, and augers, shall be equipped with at least one portable fire extinguisher.

(2) Power shovels, draglines, and other large equipment shall be equipped with at least one portable fire extinguisher; however, additional fire extinguishers may be required by an authorized representative of the Secretary.

(3) Auxiliary equipment such as portable drills, sweepers, and scrapers, when operated more than 600 feet from equipment required to have portable fire extinguishers, shall be equipped with at least one fire extinguisher.

(d) Fire extinguishers shall be provided at permanent electrical installations commensurate with the potential fire hazard at such installation in accordance with the recommendations of the National Fire Protection Association.

(e) Two portable fire extinguishers, or the equivalent, shall be provided at each of the following combustible liquid storage installations:

(1) Near each above ground or unburied combustible liquid storage station; and,

(2) Near the transfer pump of each buried combustible liquid storage tank.

(f) Vehicles transporting explosives and blasting agents shall be equipped with fire protection as recommended in Code 495, section 20, National Fire Protection Association Handbook, 12th Edition, 1962.

§ 77.1110 Examination and maintenance of firefighting equipment.

Firefighting equipment shall be continuously maintained in a usable and operative condition. Fire extinguishers shall be examined at least once every 6 months and the date of such examination shall be recorded on a permanent tag attached to the extinguisher.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995]

§ 77.1111 Welding, cutting, soldering; use of fire extinguisher.

One portable fire extinguisher shall be provided at each location where welding, cutting, or soldering with arc or flame is performed.

§ 77.1112 Welding, cutting, or soldering with arc or flame; safeguards.

(a) When welding, cutting, or soldering with arc or flame near combustible materials, suitable precautions shall be taken to insure that smoldering metal or sparks do not result in a fire.

(b) Before welding, cutting, or soldering is performed in areas likely to contain methane, an examination for methane shall be made by a qualified person with a device approved by the Secretary for detecting methane. Examinations for methane shall be made immediately before and periodically during welding, cutting, or soldering and such work shall not be permitted to commence or continue in air which contains 1.0 volume per centum or more of methane.

Subpart M Maps
§ 77.1200 Mine map.

The operator shall maintain an accurate and up-to-date map of the mine, on a scale of not less than 100 nor more than 500 feet to the inch, at or near the mine, in an area chosen by the mine operator, with a duplicate copy on file at a separate and distinct location, to minimize the danger of destruction by fire or other hazard. The map shall show:

(a) Name and address of the mine;

(b) The property or boundary lines of the active areas of the mine;

(c) Contour lines passing through whole number elevations of the coalbed being mined. The spacing of such lines shall not exceed 25-foot elevation levels, except that a broader spacing of contour lines may be approved by the District Manager for steeply pitching coalbeds. Contour lines may be placed on overlays or tracings attached to mine maps.

(d) The general elevation of the coalbed or coalbeds being mined, and the general elevation of the surface;

(e) Either producing or abandoned oil and gas wells located on the mine property;

(f) The location and elevation of any body of water dammed or held back in any portion of the mine: Provided, however, Such bodies of water may be shown on overlays or tracings attached to the mine maps;

(g) All prospect drill holes that penetrate the coalbed or coalbeds being mined on the mine property;

(h) All auger and strip mined areas of the coalbed or coalbeds being mined on the mine property together with the line of maximum depth of holes drilled during auger mining operations.

(i) All worked out and abandoned areas;

(j) The location of railroad tracks and public highways leading to the mine, and mine buildings of a permanent nature with identifying names shown;

(k) Underground mine workings underlying and within 1,000 feet of the active areas of the mine;

(l) The location and description of at least two permanent base line points, and the location and description of at least two permanent elevation bench marks used in connection with establishing or referencing mine elevation surveys; and,

(m) The scale of the map.

§ 77.1201 Certification of mine maps.

Mine maps shall be made or certified by an engineer or surveyor registered by the State in which the mine is located.

§ 77.1202 Availability of mine map.

The mine map maintained in accordance with the provisions of § 77.1200 shall be available for inspection by the Secretary or his authorized representative.

Subpart N Explosives and Blasting
§ 77.1300 Explosives and blasting.

(a) No explosives, blasting agent, detonator, or any other related blasting device or material shall be stored, transported, carried, handled, charged, fired, destroyed, or otherwise used, employed or disposed of by any person at a coal mine except in accordance with the provisions of §§ 77.1301 through 77.1304, inclusive.

(b) The term “explosives” as used in this Subpart N includes blasting agents. The standards in this Subpart N in which the term “explosives” appears are applicable to blasting agents (as well as to other explosives) unless blasting agents are expressly excluded.

§ 77.1301 Explosives; magazines.

(a) Detonators and explosives other than blasting agents shall be stored in magazines.

(b) Detonators shall not be stored in the same magazine with explosives.

(c) Magazines other than box type shall be:

(1) Located in accordance with the current American Table of Distances for storage of explosives.

(2) Detached structures located away from powerlines, fuel storage areas, and other possible sources of fire.

(3) Constructed substantially of noncombustible material or covered with fire-resistant material.

(4) Reasonably bullet resistant.

(5) Electrically bonded and grounded if constructed of metal.

(6) Made of nonsparking materials on the inside, including floors.

(7) Provided with adequate and effectively screened ventilation openings near the floor and ceiling.

(8) Kept locked securely when unattended.

(9) Posted with suitable danger signs so located that a bullet passing through the face of a sign will not strike the magazine.

(10) Used exclusively for storage of explosives or detonators and kept free of all extraneous materials.

(11) Kept clean and dry in the interior, and in good repair.

(12) Unheated, unless heated in a manner that does not create a fire or explosion hazard.

(d) Box-type magazines used to store explosives or detonators in work areas shall be constructed with only nonsparking material inside and equipped with covers or doors and shall be located out of the line of blasts.

(e) Secondary and box-type magazines shall be suitably labeled.

(f) Detonator-storage magazines shall be separated by at least 25 feet from explosive-storage magazines.

(g) Cases or boxes containing explosives shall not be stored in magazines on their ends or sides nor stacked more than 6 feet high.

(h) Ammonium nitrate-fuel oil blasting agents shall be physically separated from other explosives, safety fuse, or detonating cord stored in the same magazine and in such a manner that oil does not contaminate the other explosives, safety fuse or detonating cord.

§ 77.1302 Vehicles used to transport explosives.

(a) Vehicles used to transport explosives, other than blasting agents, shall have substantially constructed bodies, no sparking metal exposed in the cargo space, and shall be equipped with suitable sides and tail gates; explosives shall not be piled higher than the side or end.

(b) Vehicles containing explosives or detonators shall be maintained in good condition and shall be operated at a safe speed and in accordance with all safe operating practices.

(c) Vehicles containing explosives or detonators shall be posted with proper warning signs.

(d) Other materials or supplies shall not be placed on or in the cargo space of a conveyance containing explosives, detonating cord or detonators, except for safety fuse and except for properly secured nonsparking equipment used expressly in the handling of such explosives, detonating cord or detonators.

(e) Explosives and detonators shall be transported in separate vehicles unless separated by 4 inches of hardwood or the equivalent.

(f) Explosives or detonators shall be transported promptly without undue delays in transit.

(g) Explosives or detonators shall be transported at times and over routes that expose a minimum number of persons.

(h) Only the necessary attendants shall ride on or in vehicles containing explosives or detonators.

(i) Vehicles shall be attended, whenever practical and possible, while loaded with explosives or detonators.

(j) When vehicles containing explosives or detonators are parked, the brakes shall be set, the motive power shut off, and the vehicles shall be blocked securely against rolling.

(k) Vehicles containing explosives or detonators shall not be taken to a repair garage or shop for any purpose.

§ 77.1303 Explosives, handling and use.

(a) Persons who use or handle explosives or detonators shall be experienced men who understand the hazards involved; trainees shall do such work only under the supervision of and in the immediate presence of experienced men.

(b) Blasting operations shall be under the direct control of authorized persons.

(c) Substantial nonconductive closed containers shall be used to carry explosives, other than blasting agents to the blasting site.

(d) Damaged or deteriorated explosives or detonators shall be destroyed in a safe manner.

(e) Where electric blasting is to be performed, electric circuits to equipment in the immediate area to be blasted shall be deenergized before explosives or detonators are brought into the area; the power shall not be turned on again until after the shots are fired.

(f) Explosives shall be kept separated from detonators until charging is started.

(g) Areas in which charged holes are awaiting firing shall be guarded, or barricaded and posted, or flagged against unauthorized entry.

(h) Ample warning shall be given before blasts are fired. All persons shall be cleared and removed from the blasting area unless suitable blasting shelters are provided to protect men endangered by concussion or flyrock from blasting.

(i) Lead wires and blasting lines shall not be strung across power conductors, pipelines, railroad tracks, or within 20 feet of bare powerlines. They shall be protected from sources of static or other electrical contact.

(j) For the protection of underground workers, special precautions shall be taken when blasting in close proximity to underground operations, and no blasting shall be done that would be hazardous to persons working underground.

(k) Holes shall not be drilled where there is danger of intersecting a charged or misfired hole.

(l) Only wooden or other nonsparking implements shall be used to punch holes in an explosive cartridge.

(m) Tamping poles shall be blunt and squared at one end and made of wood, nonsparking material, or of special plastic acceptable to the Mine Safety and Health Administration.

(n) Delay connectors for firing detonating cord shall be treated and handled with the same safety precautions as blasting caps and electric detonators.

(o) Capped primers shall be made up at the time of charging and as close to the blasting site as conditions allow.

(p) A capped primer shall be prepared so that the detonator is contained securely and is completely embedded within the explosive cartridge.

(q) No tamping shall be done directly on a capped primer.

(r) Detonating cord shall not be used if it has been kinked, bent, or otherwise handled in such a manner that the train of detonation may be interrupted.

(s) Fuse shall not be used if it has been kinked, bent sharply, or handled roughly in such a manner that the train of deflagration may be interrupted.

(t) Blasting caps shall be crimped to fuses only with implements designed for that specific purpose.

(u) When firing from 1 to 15 blast-holes with safety fuse ignited individually using hand-held lighters, the fuses shall be of such lengths to provide the minimum burning time specified in the following table for a particular size round:

Number of holes in a round | Minimum burning time, minutes

1 | 2

2 to 5 | 2 2/3

6 to 10 | 3 1/3

11 to 15 | 5

In no case shall any 40-second-per-foot safety fuse less than 36 inches long or any 30-second-per-foot safety fuse less than 48 inches long be used.

(v) The burning rate of the safety fuse in use at any time shall be measured, posted in conspicuous locations, and brought to the attention of all men concerned with blasting.

(w) Electric detonators of different brands shall not be used in the same round.

(x) Adequate priming shall be employed to guard against misfires, increased toxic fumes, and poor performance.

(y) Except when being tested with a blasting galvanometer:

(1) Electric detonators shall be kept shunted until they are being connected to the blasting line or wired into a blasting round.

(2) Wired rounds shall be kept shunted until they are being connected to the blasting line.

(3) Blasting lines shall be kept shunted until immediately before blasting.

(z) Completely wired rounds shall be tested with a blasting galvanometer before connections are made to the blasting line.

(aa) Permanent blasting lines shall be properly supported, insulated, and kept in good repair.

(bb) At least a 5-foot airgap shall be provided between the blasting circuit and the power circuit.

(cc) When instantaneous blasting is performed, the double-trunkline or loop system shall be used in detonating-cord blasting.

(dd) When instantaneous blasting is performed, trunklines, in multiple-row blasts, shall make one or more complete loops, with crossties between loops at intervals of not over 200 feet.

(ee) All detonating cord knots shall be tight and all connections shall be kept at right angles to the trunklines.

(ff) Power sources shall be suitable for the number of electrical detonators to be fired and for the type of circuits used.

(gg) Electric circuits from the blasting switches to the blast area shall not be grounded.

(hh) Safety switches and blasting switches shall be labeled, encased in boxes, and arranged so that the covers of the boxes cannot be closed with the switches in the through-circuit or firing position.

(ii) Blasting switches shall be locked in the open position, except when closed to fire the blast. Lead wires shall not be connected to the blasting switch until the shot is ready to be fired.

(jj) The key or other control to an electrical firing device shall be entrusted only to the person designated to fire the round or rounds.

(kk) If branch circuits are used when blasts are fired from power circuits, safety switches located at safe distances from the blast areas shall be provided in addition to the main blasting switch.

(ll) Misfires shall be reported to the proper supervisor and shall be disposed of safely before any other work is performed in that blasting area.

(mm) When safety fuse has been used, men shall not return to misfired holes for at least 30 minutes.

(nn) When electric blasting caps have been used, men shall not return to misfired holes for at least 15 minutes.

(oo) If explosives are suspected of burning in a hole, all persons in the endangered area shall move to a safe location and no one should return to the hole until the danger has passed, but in no case within 1 hour.

(pp) Blasted areas shall be examined for undetonated explosives after each blast and undetonated explosives found shall be disposed of safely.

(qq) Blasted areas shall not be reentered by any person after firing until such time as concentrations of smoke, dust, or fumes have been reduced to safe limits.

(rr) In secondary blasting, if more than one shot is to be fired at one time, blasting shall be done electrically or with detonating cord.

(ss) Unused explosives and detonators shall be moved to a safe location as soon as charging operations are completed.

(tt) When electric detonators are used, charging shall be stopped immediately when the presence of static electricity or stray currents is detected; the condition shall be remedied before charging is resumed.

(uu) When electric detonators are used, charging shall be suspended and men withdrawn to a safe location upon the approach of an electrical storm.

§ 77.1304 Blasting agents; special provisions.

(a) Sensitized ammonium nitrate blasting agents, and the components thereof prior to mixing, shall be mixed and stored in accordance with the recommendations in Bureau of Mines Information Circular 8179, “Safety Recommendations for Sensitized Ammonium Nitrate Blasting Agents,” or subsequent revisions.

(b) Where pneumatic loading is employed, before any type of blasting operation using blasting agents is put into effect, an evaluation of the potential hazard of static electricity shall be made. Adequate steps, including the grounding and bonding of the conductive parts of pneumatic loading equipment, shall be taken to eliminate the hazard of static electricity before blasting agent use is commenced.

(c) Pneumatic loading equipment shall not be grounded to waterlines, airlines, rails, or the permanent electrical grounding systems.

(d) Hoses used in connection with pneumatic loading machines shall be of the semiconductive type, having a total resistance low enough to permit the dissipation of static electricity and high enough to limit the flow of stray electric currents to a safe level. Wire-countered hose shall not be used because of the potential hazard from stray electric currents.

Subpart O Personnel Hoisting
§ 77.1400 Personnel hoists and elevators.

Except as provided in § 77.1430, the sections in this Subpart O apply only to hoists and elevators, together with their appurtenances, that are used for hoisting persons.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53241, Nov. 25, 1983]

§ 77.1401 Automatic controls and brakes.

Hoists and elevators shall be equipped with overspeed, overwind, and automatic stop controls and with brakes capable of stopping the elevator when fully loaded.

§ 77.1402 Rated capacity.

Hoists and elevators shall have rated capacities consistent with the loads handled.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53241, Nov. 25, 1983]

§ 77.1402-1 Maximum load; posting.

The operator shall designate the maximum number of men permitted to ride on each hoist or elevator at one time; this limit shall be posted on each elevator and on each landing.

[36 FR 9364, May 22, 1971. Redesignated at 48 FR 53241, Nov. 25, 1983]

§ 77.1403 Daily examination of hoisting equipment.

Hoists and elevators shall be examined daily and such examinations shall include, but not be limited to, the following:

(a) Elevators. (1) A visual examination of the ropes for wear, broken wires, and corrosion, especially at excessive strain points such as near the attachments and where the rope rests on the sheaves;

(2) An examination of the elevator for loose, missing or defective parts;

(b) Hoists and elevators. (1) An examination of the rope fastenings for defects;

(2) An examination of sheaves for broken flanges, defective bearings, rope alignment, and proper lubrication; and

(3) An examination of the automatic controls and brakes required under § 77.1401.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811)

[48 FR 53241, Nov. 25, 1983]

§ 77.1404 Certifications and records of daily examinations.

At the completion of each daily examination required by § 77.1403, the person making the examination shall certify, by signature and date, that the examination has been made. If any unsafe condition is found during the examinations required by § 77.1403, the person conducting the examination shall make a record of the condition and the date. Certifications and records shall be retained for one year.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53241, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995]

§ 77.1405 Operation of hoisting equipment after repairs.

Empty conveyances shall be operated at least one round trip before hoisting persons after any repairs.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53241, Nov. 25, 1983]

220 Wire Ropes

Authority: Sections 77.1430 through 77.1438 issued under sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811).

Source: Sections 77.1430 through 77.1438 appear at 48 FR 53241, Nov. 25, 1983, unless otherwise noted.

§ 77.1430 Wire ropes; scope.

(a) Sections 77.1431 through 77.1438 apply to wire ropes in service used to hoist—

(1) Persons in shafts and slopes underground;

(2) Persons with an incline hoist on the surface; or

(3) Loads in shaft or slope development when persons work below suspended loads.

(b) These standards do not apply to wire ropes used for elevators.

§ 77.1431 Minimum rope strength.

At installation, the nominal strength (manufacturer's published catalog strength) of wire ropes used for hoisting shall meet the minimum rope strength values obtained by the following formulas in which “L” equals the maximum suspended rope length in feet:

(a) Winding drum ropes (all constructions, including rotation resistant).

For rope lengths less than 3,000 feet: Minimum Value = Static Load × (7.0−0.001L) For rope lengths 3,000 feet or greater: Minimum Value = Static Load × 4.0

(b) Friction drum ropes.

For rope lengths less than 4,000 feet: Minimum Value = Static Load × (7.0−0.0005L) For rope lengths 4,000 feet or greater: Minimum Value = Static Load × 5.0

(c) Tail ropes (balance ropes).

Minimum Value = Weight of Rope × 7.0

[48 FR 53241, Nov. 25, 1983; 48 FR 54975, Dec. 8, 1983]

§ 77.1432 Initial measurement.

After initial rope stretch but before visible wear occurs, the rope diameter of newly installed wire ropes shall be measured at least once in every third interval of active length and the measurements averaged to establish a baseline for subsequent measurements. A record of the measurements and the date shall be made by the person taking the measurements. This record shall be retained until the rope is retired from service.

[48 FR 53241, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995]

§ 77.1433 Examinations.

(a) At least once every fourteen calendar days, each wire rope in service shall be visually examined along its entire active length for visible structural damage, corrosion, and improper lubrication or dressing. In addition, visual examination for wear and broken wires shall be made at stress points, including the area near attachments, where the rope rests on sheaves, where the rope leaves the drum, at drum crossovers, and at change-of-layer regions. When any visible condition that results in a reduction of rope strength is present, the affected portion of the rope shall be examined on a daily basis.

(b) Before any person is hoisted with a newly installed wire rope or any wire rope that has not been examined in the previous fourteen calendar days, the wire rope shall be examined in accordance with paragraph (a) of this section.

(c) At least once every six months, nondestructive tests shall be conducted of the active length of the rope, or rope diameter measurements shall be made—

(1) Wherever wear is evident;

(2) Where the hoist rope rests on sheaves at regular stopping points;

(3) Where the hoist rope leaves the drum at regular stopping points; and

(4) At drum crossover and change-of-layer regions.

(d) At the completion of each examination required by paragraph (a) of this section, the person making the examination shall certify, by signature and date, that the examination has been made. If any condition listed in paragraph (a) of this standard is present, the person conducting the examination shall make a record of the condition and the date. Certifications and records of examinations shall be retained for one year.

(e) The person making the measurements or nondestructive tests as required by paragraph (c) of this section shall record the measurements or test results and the date. This record shall be retained until the rope is retired from service.

[48 FR 53241, Nov. 25, 1983; 48 FR 54975, Dec. 8, 1983, 60 FR 33723, June 29, 1995]

§ 77.1434 Retirement criteria.

Unless damage or deterioration is removed by cutoff, wire ropes shall be removed from service when any of the following conditions occurs:

(a) The number of broken wires within a rope lay length, excluding filler wires, exceeds either—

(1) Five percent of the total number of wires; or

(2) Fifteen percent of the total number of wires within any strand;

(b) On a regular lay rope, more than one broken wire in the valley between strands in one rope lay length;

(c) A loss of more than one-third of the original diameter of the outer wires;

(d) Rope deterioration from corrosion;

(e) Distortion of the rope structure;

(f) Heat damage from any source;

(g) Diameter reduction due to wear that exceeds six percent of the baseline diameter measurement; or

(h) Loss of more than ten percent of rope strength as determined by nondestructive testing.

§ 77.1435 Load end attachments.

(a) Wire rope shall be attached to the load by a method that develops at least 80 percent of the nominal strength of the rope.

(b) Except for terminations where use of other materials is a design feature, zinc (spelter) shall be used for socketing wire ropes. Design feature means either the manufacturer's original design or a design approved by a registered professional engineer.

(c) Load end attachment methods using splices are prohibited.

§ 77.1436 Drum end attachment.

(a) For drum end attachment, wire rope shall be attached—

(1) Securely by clips after making one full turn around the drum spoke;

(2) Securely by clips after making one full turn around the shaft, if the drum is fixed to the shaft; or

(3) By properly assembled anchor bolts, clamps, or wedges, provided that the attachment is a design feature of the hoist drum. Design feature means either the manufacturer's original design or a design approved by a registered professional engineer.

(b) A minimum of three full turns of wire rope shall be on the drum when the rope is extended to its maximum working length.

§ 77.1437 End attachment retermination.

Damaged or deteriorated wire rope shall be removed by cutoff and the rope reterminated where there is—

(a) More than one broken wire at an attachment;

(b) Improper installation of an attachment;

(c) Slippage at an attachment; or

(d) Evidence of deterioration from corrosion at an attachment.

§ 77.1438 End attachment replacement.

Wire rope attachments shall be replaced when cracked, deformed, or excessively worn.

Subpart P Auger Mining
§ 77.1500 Auger mining; planning.

Auger mining shall be planned and conducted by the operator to insure against any hazard to underground workings located at or near such auger operations and all auger holes shall be located so as to prevent:

(a) The disruption of the ventilation system of any active underground mine;

(b) Inundation hazards from surface water entering any active underground mine;

(c) Damage to the roof and ribs of active underground workings; and

(d) Intersection of auger holes with underground mine workings known to contain dangerous quantities of impounded water.

§ 77.1501 Auger mining; inspections.

(a) The face of all highwalls, to a distance of 25 feet on both sides of each drilling site, shall be inspected by a certified person before any augering operation is begun, and at least once during each coal producing shift and all loose material shall be removed from the drilling site before persons are permitted to enter the drilling area. The results of all such inspections shall be recorded daily in a book approved by the Secretary.

(b) In addition, the face of all highwalls, to a distance of 25 feet on both sides of each drilling site, shall be inspected frequently by a certified person during any auger operation conducted either during or after a heavy rainfall or during any period of intermittent freezing and thawing and the results of such inspections shall be recorded as provided in paragraph (a) of this section.

(c) When an auger hole penetrates an abandoned or mined out area of an underground mine, tests for methane and oxygen deficiency shall be made at the collar of the hole by a qualified person using devices approved by the Secretary to determine if dangerous quantities of methane or oxygen-deficient air are present or being emitted. If such is found no further work shall be performed until the atmosphere has been made safe.

(d) Tests for oxygen deficiency shall be conducted with a permissible flame safety lamp or other means approved by the Secretary and all tests for methane shall be conducted with a methane detector approved by the Secretary.

(e) Internal combustion engines shall not be operated in the vicinity of any auger hole in which tests for methane or oxygen deficiency are being made.

§ 77.1502 Auger holes; restriction against entering.

No person shall be permitted to enter an auger hole except with the approval of the MSHA Coal Mine Safety and Health District Manager of the district in which the mine is located and under such conditions as may be prescribed by such managers.

[36 FR 9364, May 22, 1971, as amended at 71 FR 16669, Apr. 3, 2006]

§ 77.1503 Augering equipment; overhead protection.

(a) Auger machines which are exposed to highwall hazards, together with all those parts of any coal elevating conveyors where persons are required to work during augering operations, shall be covered with heavy gage screen which does not obstruct the view of the highwall and is strong enough to prevent injuries to workmen from falling material.

(b) No work shall be done under any overhang and, when a crew is engaged in connecting or disconnecting auger sections under a highwall, at least one person shall be assigned to observe the highwall for possible movement.

§ 77.1504 Auger equipment; operation.

(a) Persons shall be kept clear of the auger train while it is in motion and shall not be permitted to pass under or over an auger train, except where adequate crossing facilities are provided.

(b) Persons shall be kept clear of auger sections being swung into position.

(c) No person, including the auger machine operator, shall, where practicable, be stationed in direct line with a borehole during augering operations.

(d) Operator of auger equipment shall not leave the controls of such equipment while the auger is in operation.

(e) Adequate illumination shall be provided for work areas after dark.

§ 77.1505 Auger holes; blocking.

Auger holes shall be blocked with highwall spoil or other suitable material before they are abandoned.

Subpart Q Loading and Haulage
§ 77.1600 Loading and haulage; general.

(a) Only authorized persons shall be permitted on haulage roads and at loading or dumping locations.

(b) Traffic rules, signals, and warning signs shall be standardized at each mine and posted.

(c) Where side or overhead clearances on any haulage road or at any loading or dumping location at the mine are hazardous to mine workers, such areas shall be conspicuously marked and warning devices shall be installed when necessary to insure the safety of the workers.

§ 77.1601 Transportation of persons; restrictions.

No person shall be permitted to ride or be otherwise transported on or in the following equipment whether loaded or empty:

(a) Dippers, shovels, buckets, forks, and clamshells;

(b) The cargo space of dump trucks or haulage equipment used to transport coal or other material;

(c) Outside the cabs and beds of mobile equipment;

(d) Chain, belt, or bucket conveyors, except where such conveyors are specifically designed to transport persons; and

(e) Loaded buckets on aerial tramways.

§ 77.1602 Use of aerial tramways to transport persons.

Persons other than maintenance men shall not ride empty buckets on aerial tramways unless the following features are provided:

(a) Two independent brakes, each capable of holding the maximum load.

(b) Direct communication between terminals.

(c) Power drives with emergency power available in case of primary power failure.

(d) Buckets equipped with positive locks to prevent accidental tripping or dumping.

§ 77.1603 Trains and locomotives; authorized persons.

(a) Only authorized persons shall be permitted to ride on trains or locomotives and they shall ride in a safe position.

(b) Men shall not get on or off moving equipment, except that trainmen may get on or off of slowly moving trains.

§ 77.1604 Transportation of persons; overcrowding.

(a) No man-trip vehicle or other conveyance used to transport persons to and from work areas at surface coal mines shall be overcrowded and all persons shall ride in a safe position.

(b) Supplies, materials, and tools other than small handtools shall not be transported with men in man-trip vehicles unless such vehicles are specifically designed to make such transportation safe.

§ 77.1605 Loading and haulage equipment; installations.

(a) Cab windows shall be of safety glass or equivalent, in good condition and shall be kept clean.

(b) Mobile equipment shall be equipped with adequate brakes, and all trucks and front-end loaders shall also be equipped with parking brakes.

(c) Positive-action type brakes shall be provided on aerial tramways.

(d) Mobile equipment shall be provided with audible warning devices. Lights shall be provided on both ends when required.

(e) Guard nets or other suitable protection shall be provided where tramways pass over roadways, walkways, or buildings.

(f) Guards shall be installed to prevent swaying buckets from hitting towers.

(g) Aerial tramway cable connections shall be designed to offer minimum obstruction to the passage of wheels.

(h) Rocker-bottom or bottom-dump cars shall be equipped with positive locking devices, or other suitable devices.

(i) Ramps and dumps shall be of solid construction, of ample width, have ample clearance and headroom, and be kept reasonably free of spillage.

(j) Chute-loading installations shall be designed so that the men pulling chutes are not required to be in a hazardous position during loading operations.

(k) Berms or guards shall be provided on the outer bank of elevated roadways.

(l) Berms, bumper blocks, safety hooks, or similar means shall be provided to prevent overtravel and overturning at dumping locations.

(m) Roadbeds, rails, joints, switches, frogs, and other elements on railroads shall be designed, installed, and maintained in a safe manner consistent with the speed and type of haulage.

(n) Where practicable, a minimum of 30 inches continuous clearance from the farthest projection of moving railroad equipment shall be provided on at least one side of the tracks; all places where it is not possible to provide 30-inch clearance shall be marked conspicuously.

(o) Track guardrails, lead rails, and frogs shall be protected or blocked so as to prevent a person's foot from becoming wedged.

(p) Positive-acting stop-blocks, derail devices, track skates, or other adequate means shall be installed wherever necessary to protect persons from runaway or moving railroad equipment.

(q) Switch throws shall be installed so as to provide adequate clearance for switchmen.

(r) Where necessary, bumper blocks or the equivalent shall be provided at all track dead ends.

§ 77.1606 Loading and haulage equipment; inspection and maintenance.

(a) Mobile loading and haulage equipment shall be inspected by a competent person before such equipment is placed in operation. Equipment defects affecting safety shall be recorded and reported to the mine operator.

(b) Carriers on aerial tramways, including loading and unloading mechanisms, shall be inspected each shift; brakes shall be inspected daily; ropes and supports shall be inspected as recommended by the manufacturer or as physical conditions warrant. Equipment defects affecting safety shall be reported to the mine operator.

(c) Equipment defects affecting safety shall be corrected before the equipment is used.

§ 77.1607 Loading and haulage equipment; operation.

(a) Vehicles shall follow at a safe distance; passing shall be limited to areas of adequate clearance and visibility.

(b) Mobile equipment operators shall have full control of the equipment while it is in motion.

(c) Equipment operating speeds shall be prudent and consistent with conditions of roadway, grades, clearance, visibility, traffic, and the type of equipment used.

(d) Cabs of mobile equipment shall be kept free of extraneous materials.

(e) Operators shall sit facing the direction of travel while operating equipment with dual controls.

(f) When an equipment operator is present, men shall notify him before getting on or off equipment.

(g) Equipment operators shall be certain, by signal or other means, that all persons are clear before starting or moving equipment.

(h) Where possible, aerial tramways shall not be started until the tramway operator has ascertained that everyone is in the clear.

(i) Dust control measures shall be taken where dust significantly reduces visibility of equipment operators.

(j) Dippers, buckets, loading booms, or heavy suspended loads shall not be swung over the cabs of haulage vehicles until the drivers are out of the cabs and in safe locations, unless the trucks are designed specifically to protect the drivers from falling material.

(k) Men shall not work or pass under the buckets or booms of loaders in operation.

(l) Tires shall be deflated before repairs on them are started and adequate means shall be provided to prevent wheel locking rims from creating a hazard during tire inflation.

(m) Electrically powered mobile equipment shall not be left unattended unless the master switch is in the off position, all operating controls are in the neutral position, and the brakes are set or other equivalent precautions are taken against rolling.

(n) Mobile equipment shall not be left unattended unless the brakes are set. The wheels shall be turned into a bank or berm, or shall be blocked, when such equipment is parked on a grade.

(o) Lights, flares, or other warning devices shall be posted when parked equipment creates a hazard to vehicular traffic.

(p) Dippers, buckets, scraper blades, and similar movable parts shall be secured or lowered to the ground when not in use.

(q) Shovel trailing cables shall not be moved with the shovel dipper unless cable slings or sleds are used.

(r) Equipment which is to be hauled shall be loaded and protected so as to prevent sliding or spillage.

(s) When moving between work areas, the equipment shall be secured in the travel position.

(t) Any load extending more than 4 feet beyond the rear of the vehicle body should be marked clearly with a red flag by day and a red light at night.

(u) Tow bars shall be used to tow heavy equipment and a safety chain shall be used in conjunction with each tow bar.

(v) Railroad cars shall be kept under control at all times by the car dropper. Cars shall be dropped at a safe rate and in a manner that will insure that the car dropper maintains a safe position while working and traveling around the cars.

(w) Railroad cars shall not be coupled or uncoupled manually from the inside of curves unless the railroad and cars are so designed to eliminate any hazard from coupling or uncoupling cars from inside of curves.

(x) Persons shall wear safety belts when dropping railroad cars.

(y) Railcars shall not be left on sidetracks unless ample clearance is provided for traffic on adjacent tracks.

(z) Parked railcars, unless held effectively by brakes, shall be blocked securely.

(aa) Railroad cars and all trucks shall be trimmed properly when they have been loaded higher than the confines of their cargo space.

(bb) When the entire length of a conveyor is visible from the starting switch, the operator shall visually check to make certain that all persons are in the clear before starting the conveyor. When the entire length of the conveyor is not visible from the starting switch, a positive audible or visible warning system shall be installed and operated to warn persons that the conveyor will be started.

(cc) Unguarded conveyors with walkways shall be equipped with emergency stop devices or cords along their full length.

(dd) Adequate backstops or brakes shall be installed on inclined-conveyor drive units to prevent conveyors from running in reverse if a hazard to personnel would be caused.

(ee) Aerial tram conveyor buckets shall not be overloaded, and feed shall be regulated to prevent spillage.

§ 77.1608 Dumping facilities.

(a) Dumping locations and haulage roads shall be kept reasonably free of water, debris, and spillage.

(b) Where the ground at a dumping place may fail to support the weight of a loaded dump truck, trucks shall be dumped a safe distance back from the edge of the bank.

(c) Adequate protection shall be provided at dumping locations where persons may be endangered by falling material.

(d) Grizzlies, grates, and other sizing devices at dump and transfer points shall be anchored securely in place.

(e) If truck spotters are used, they shall be well in the clear while trucks are backing into dumping position and dumping; lights shall be used at night to direct trucks.

Subpart R Miscellaneous
§ 77.1700 Communications in work areas.

No employee shall be assigned, or allowed, or be required to perform work alone in any area where hazardous conditions exist that would endanger his safety unless he can communicate with others, can be heard, or can be seen.

§ 77.1701 Emergency communications; requirements.

(a) Each operator of a surface coal mine shall establish and maintain a communication system from the mine to the nearest point of medical assistance for use in an emergency.

(b) The emergency communication system required to be maintained under paragraph (a) of this section may be established by telephone or radio transmission or by any other means of prompt communication to any facility (for example, the local sheriff, the State highway patrol, or local hospital) which has available the means of communication with the person or persons providing emergency medical assistance or transportation in accordance with the provisions of paragraph (a) of this section.

§ 77.1702 Arrangements for emergency medical assistance and transportation for injured persons; reporting requirements; posting requirements.

(a) Each operator of a surface coal mine shall make arrangements with a licensed physician, medical service, medical clinic, or hospital to provide 24-hour emergency medical assistance for any person injured at the mine.

(b) Each operator shall make arrangements with an ambulance service, or otherwise provide for 24-hour emergency transportation for any person injured at the mine.

(c) Each operator shall, on or before September 30, 1971, report to the Coal Mine Health and Safety District Manager for the district in which the mine is located the name, title and address of the physician, medical service, medical clinic, hospital, or ambulance service with whom arrangements have been made, or otherwise provided, in accordance with the provisions of paragraphs (a) and (b) of this section.

(d) Each operator shall, within 10 days after any change of the arrangements required to be reported under the provisions of this section, report such changes to the Coal Mine Health and Safety District Manager. If such changes involve a substitution of persons, the operator shall provide the name, title, and address of the person substituted together with the name and address of the medical service, medical clinic, hospital, or ambulance service with which such person or persons are associated.

(e) Each operator shall, immediately after making an arrangement required under the provisions of paragraphs (a) and (b) of this section, or immediately after any change, of such agreement, post at appropriate places at the mine the names, titles, addresses, and telephone numbers of all persons or services currently available under such arrangements to provide medical assistance and transportation at the mine.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971; 60 FR 33723, June 29, 1995]

§ 77.1703 First-Aid training; supervisory employees.

The mine operator shall conduct first-aid training courses for selected supervisory employees at the mine. Within 60 days after the selection of a new supervisory employee to be so trained, the mine operator shall certify by signature and date the name of the employee and date on which the employee satisfactorily completed the first-aid training course. The certification shall be kept at the mine and made available on request to an authorized representative of the Secretary.

[56 FR 1478, Jan. 14, 1991]

§ 77.1704 First aid training program; availability of instruction to all miners.

On or before December 30, 1971, each operator of a surface coal mine shall make available to all miners employed in the mine a course of instruction in first aid conducted by the operator or under the auspices of the operator, and such a course of instruction shall be made available to newly employed miners within 6 months after the date of employment.

§ 77.1705 First aid training program; retraining of supervisory employees; availability to all miners.

Beginning January 1, 1972, each operator of a surface coal mine shall conduct refresher first aid training programs each calendar year for all selected supervisory employees and make available refresher first aid training courses to all miners employed in the mine.

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971]

§ 77.1706 First aid training program; minimum requirements.

(a) All first aid training programs required under the provisions of §§ 77.1703 and 77.1704 shall include 10 class hours of training in a course of instruction similar to that outlined in “First Aid, A Bureau of Mines Instruction Manual.”

(b) Refresher first aid training programs required under the provisions of § 77.1705 shall include 5 class hours of refresher training in a course of instruction similar to that outlined in “First Aid, A Bureau of Mines Instruction Manual.”

§ 77.1707 First aid equipment; location; minimum requirements.

(a) Each operator of a surface coal mine shall maintain a supply of the first aid equipment set forth in paragraph (b) of this section at or near each working place where coal is being mined, at each preparation plant and at shops and other surface installation where ten or more persons are regularly employed.

(b) The first aid equipment required to be maintained under the provisions of paragraph (a) of this section shall include at least the following:

(1) One stretcher;

(2) One broken-back board (if a splint-stretcher combination is used it will satisfy the requirements of both paragraph (b) (1) of this section and this paragraph (b) (2));

(3) Twenty-four triangular bandages (15 if a splint-stretcher combination is used);

(4) Eight 4-inch bandage compresses;

(5) Eight 2-inch bandage compresses;

(6) Twelve 1-inch adhesive compresses;

(7) An approved burn remedy;

(8) Two cloth blankets;

(9) One rubber blanket or equivalent substitute;

(10) Two tourniquets;

(11) One 1-ounce bottle of aromatic spirits of ammonia or 1 dozen ammonia ampules; and,

(12) The necessary complements of arm and leg splints or two each inflatable plastic arm and leg splints.

(c) All first aid supplies required to be maintained under the provisions of paragraphs (a) and (b) of this section shall be stored in suitable, sanitary, dust tight, moisture proof containers and such supplies shall be accessible to the miners.

§ 77.1708 Safety program; instruction of persons employed at the mine.

On or before September 30, 1971, each operator of a surface coal mine shall establish and maintain a program of instruction with respect to the safety regulations and procedures to be followed at the mine and shall publish and distribute to each employee, and post in conspicuous places throughout the mine, all such safety regulations and procedures established in accordance with the provisions of this section.

[36 FR 9364, May 22, 1971, as amended at 36 FR 13143, July 15, 1971]

§ 77.1710 Protective clothing; requirements.

Each employee working in a surface coal mine or in the surface work areas of an underground coal mine shall be required to wear protective clothing and devices as indicated below:

(a) Protective clothing or equipment and face-shields or goggles shall be worn when welding, cutting, or working with molten metal or when other hazards to the eyes exist.

(b) Suitable protective clothing to cover the entire body when handling corrosive or toxic substances or other materials which might cause injury to the skin.

(c) Protective gloves when handling materials or performing work which might cause injury to the hands; however, gloves shall not be worn where they would create a greater hazard by becoming entangled in the moving parts of equipment.

(d) A suitable hard hat or hard cap when in or around a mine or plant where falling objects may create a hazard. If a hard hat or hard cap is painted, nonmetallic based paint shall be used.

(e) Suitable protective footwear.

(f) Snug-fitting clothing when working around moving machinery or equipment.

(g) Safety belts and lines where there is danger of falling; a second person shall tend the lifeline when bins, tanks, or other dangerous areas are entered.

(h) Lifejackets or belts where there is danger from falling into water.

(i) Seatbelts in a vehicle where there is a danger of overturning and where roll protection is provided.

(Sec. 101(a), Federal Coal Mine Health and Safety Act of 1969, as amended (83 Stat. 745; 30 U.S.C. 811(a))

[36 FR 9382, May 22, 1971, as amended at 36 FR 13143, July 15, 1971; 39 FR 7176, Feb. 25, 1974]

§ 77.1710-1 Distinctively colored hard hats or hard caps; identification for newly employed, inexperienced miners.

Hard hats or hard caps distinctively different in color from those worn by experienced miners shall be worn at all times by each newly employed, inexperienced miner when working in or around a mine or plant for at least one year from the date of his initial employment as a miner or until he has been qualified or certified as a miner by the State in which he is employed.

(Sec. 101(a), Federal Coal Mine Health and Safety Act of 1969, as amended (83 Stat. 745; 30 U.S.C. 811(a))

[39 FR 7176, Feb. 25, 1974]

§ 77.1711 Smoking prohibition.

No person shall smoke or use an open flame where such practice may cause a fire or explosion.

§ 77.1712 Reopening mines; notification; inspection prior to mining.

Prior to reopening any surface coal mine after it has been abandoned or declared inactive by the operator, the operator shall notify the Coal Mine Health and Safety District Manager for the district in which the mine is located, and an inspection of the entire mine shall be completed by an authorized representative of the Secretary before any mining operations in such mine are instituted.

§ 77.1713 Daily inspection of surface coal mine; certified person; reports of inspection.

(a) At least once during each working shift, or more often if necessary for safety, each active working area and each active surface installation shall be examined by a certified person designated by the operator to conduct such examinations for hazardous conditions and any hazardous conditions noted during such examinations shall be reported to the operator and shall be corrected by the operator.

(b) If any hazardous condition noted during an examination conducted in accordance with paragraph (a) of this section creates an imminent danger, the person conducting such examination shall notify the operator and the operator shall withdraw all persons from the area affected, except those persons referred to in section 104(d) of the Act, until the danger is abated.

(c) After each examination conducted in accordance with the provisions of paragraph (a) of this section, each certified person who conducted all or any part of the examination required shall enter with ink or indelible pencil in a book approved by the Secretary the date and a report of the condition of the mine or any area of the mine which he has inspected together with a report of the nature and location of any hazardous condition found to be present at the mine. The book in which such entries are made shall be kept in an area at the mine designated by the operator to minimize the danger of destruction by fire or other hazard.

(d) All examination reports recorded in accordance with the provisions of paragraph (c) of this section shall include a report of the action taken to abate hazardous conditions and shall be signed or countersigned each day by at least one of the following persons:

(1) The surface mine foreman;

(2) The assistant superintendent of the mine;

(3) The superintendent of the mine;

(4) The person designated by the operator as responsible for health and safety at the mine; or,

(5) An equivalent mine official.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995; 63 FR 58613, Oct. 30, 1998]

Subpart S Trolley Wires and Trolley Feeder Wires
§ 77.1800 Cutout switches.

Trolley wires and trolley feeder wires shall be provided with cutout switches at intervals of not more than 2,000 feet and near the beginning of all branch lines.

§ 77.1801 Overcurrent protection.

Trolley wires and trolley feeder wires shall be provided with overcurrent protection.

§ 77.1801-1 Devices for overcurrent protection.

Automatic circuit interrupting devices that will deenergize the affected circuit upon occurrence of a short circuit at any point in the system will meet the requirements of § 77.1801.

§ 77.1802 Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires.

Trolley wires, trolley feeder wires, and bare signal wires shall be adequately guarded:

(a) At all points where men are required to work or pass regularly under the wires; and

(b) At man-trip stations.

The Secretary or his authorized representative shall specify other conditions where trolley wires and trolley feeder wires shall be adequately protected to prevent contact by any person, or shall require the use of improved methods to prevent such contact. Temporary guards shall be provided where trackmen and other persons are required to work in proximity to trolley wires and trolley feeder wires.

Subpart T Slope and Shaft Sinking
§ 77.1900 Slopes and shafts; approval of plans.

(a) Each operator of a coal mine shall prepare and submit for approval by the Coal Mine Health and Safety District Manager for the district in which the mine is located, a plan providing for the safety of workmen in each slope or shaft that is commenced or extended after June 30, 1971. The plan shall be consistent with prudent engineering design. The methods employed by the operator shall be selected to minimize the hazards to those employed in the initial or subsequent development of any such slope or shaft, and the plan shall include the following:

(1) The name and location of the mine, and the Mine Safety and Health Administration mine identification number, if known;

(2) The name and address of the mine operator;

(3) A description of the construction work and methods to be used in the construction of the slope or shaft, and whether part or all of the work will be performed by a contractor and a description of that part of the work to be performed by a contractor;

(4) The elevation, depth and dimensions of the slope or shaft;

(5) The location and elevation of the coalbed;

(6) The general characteristics of the strata through which the slope or shaft will be developed;

(7) The type of equipment which the operator proposes to use when the work is to be performed by the operator. When work is to be performed by a contractor the operator shall, as soon as known to him, supplement the plan with a description of the type of equipment to be used by the contractor;

(8) The system of ventilation to be used; and

(9) Safeguards for the prevention of caving during excavation.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 47 FR 28096, June 29, 1982; 60 FR 33723, June 29, 1995]

§ 77.1900-1 Compliance with approved slope and shaft sinking plans.

Upon approval by the Coal Mine Health and Safety District Manager of a slope or shaft sinking plan, the operator shall adopt and comply with such plan.

§ 77.1901 Preshift and onshift inspections; reports.

(a) Examinations of slope and shaft areas shall be made by a certified person for hazardous conditions, including tests for methane and oxygen deficiency:

(1) Within 90 minutes before each shift;

(2) At least once on any shift during which men are employed inside any slope or shaft during development; and

(3) Both before and after blasting.

(b) The surface area surrounding each slope and shaft shall be inspected by a certified person and all hazards in the vicinity shall be corrected before men are permitted to enter the excavation.

(c) All hazards found during any preshift or onshift inspection shall be corrected before men are allowed to enter, or continue to work in such slope or shaft. If hazardous conditions cannot be corrected, or excessive methane concentrations cannot be diluted, the excavation shall be vacated and no person shall be permitted to reenter the slope or shaft to continue excavation operations until the hazardous condition has been abated.

(d) No work shall be performed in any slope or shaft, no drilling equipment shall be started, and no electrical equipment shall be energized if the methane content in such slope or shaft is 1.0 volume per centum, or more.

(e) Nothing in this § 77.1901 shall prevent the specific assignment of men in the slope or shaft for purposes of abating excessive methane concentrations or any other hazardous condition.

(f) The results of all inspections conducted in accordance with the provisions of paragraph (a) of this section shall be recorded in a book approved by the Secretary.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995]

§ 77.1901-1 Methane and oxygen deficiency tests; approved devices.

Tests for oxygen deficiency shall be made with a permissible flame safety lamp or other means approved by the Secretary, and tests for methane shall be made with a methane detector approved by the Secretary.

§ 77.1902 Drilling and mucking operations.

Diesel-powered equipment used in the drilling, mucking, or other excavation of any slope or shaft shall be permissible, and such equipment shall be operated in a permissible manner and shall be maintained in a permissible condition.

§ 77.1902-1 Permissible diesel-powered equipment.

Diesel-powered equipment which has been approved by the Bureau of Mines or the Mine Safety and Health Administration under Part 36 of this chapter (Bureau of Mines Schedule 31) is permissible under the provisions of this section.

§ 77.1903 Hoists and hoisting; minimum requirements.

(a) Hoists used in transporting persons and material during drilling, mucking, or other excavating operations in any slope or shaft shall have rated capacities consistent with the loads to be handled.

(b) Each hoist used in drilling, mucking, or other excavating operations shall be equipped with an accurate and reliable indicator of the position of the cage, platform, or bucket. The indicator shall be installed in clear view of the hoist operator.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53242, Nov. 25, 1983; 48 FR 54975, Dec. 8, 1983]

§ 77.1904 Communications between slope and shaft bottoms and hoist operators.

(a) Two independent means of signaling shall be provided between the hoistman and all points in a slope or shaft where men are required to work. At least one of these means shall be audible to the hoistman. Signal codes used in any communication system shall be posted conspicuously at each slope and shaft.

(b) Signaling systems used for communication between slopes and shafts and the hoistman shall be tested daily.

§ 77.1905 Hoist safeguards; general.

(a) Hoists used to transport persons shall be equipped with brakes capable of stopping and holding the cage, bucket, platform, or other device when fully loaded.

(b) When persons are transported by a hoist, a second person familiar with and qualified to stop the hoist shall be in attendance, except where the hoist is fully equipped with overspeed, overwind, and automatic stop devices.

§ 77.1906 Hoists; daily inspection.

(a) Hoists used to transport persons shall be inspected daily. The inspection shall include examination of the headgear (headframe, sheave wheels, etc.), connections, links and chains, and other facilities.

(b) Prior to each working shift, and before a hoist is returned to service after it has been out of normal service for any reason, the hoist shall be run by the hoist operator through one complete cycle of operation before any person is permitted to be transported.

(c) At the completion of each daily examination required by paragraph (a) of this section, the person making the examination shall certify, by signature and date, that the examination has been made. If any unsafe condition in the hoisting equipment is present, the person conducting the examination shall make a record of the condition and the date. Certifications and records shall be retained for one year.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53242, Nov. 25, 1983, as amended at 60 FR 33723, June 29, 1995]

§ 77.1907 Hoist construction; general.

If hooks are used to attach cages or buckets to the socket or thimble of a hoisting rope, the hooks shall be self-closing.

(Sec. 101, Federal Mine Safety and Health Act of 1977, Pub. L. 91-173 as amended by Pub. L. 95-164, 91 Stat. 1291 (30 U.S.C. 811))

[48 FR 53242, Nov. 25, 1983]

§ 77.1908 Hoist installations; use.

(a) Where men are transported by means of a hoist and the depth of the shaft exceeds 50 feet, the hoist rope shall be suspended from a substantial hoisting installation which shall be high enough to provide working clearance between the bottom of the sheave and the top of the cage or bucket.

(b) Where men are transported by means of a hoist and the depth of the shaft exceeds 100 feet, temporary shaft guides and guide attachments, or other no less effective means, shall be installed to prevent the cage, platform, or bucket from swinging.

(c) All guides and guide attachments, or other no less effective means, installed in accordance with paragraph (b) of this section shall be maintained to a depth of not less than 75 feet from the bottom of the shaft.

(d) Where crossheads are used, the cage, platform, or bucket shall not be hung more than 10 feet below the crosshead.

(e) Where men are required to embark or disembark from a cage, platform or bucket suspended over or within a shaft, a loading platform shall be installed to insure safe footing.

(f) During the development of each slope or shaft, either a ladder or independently powered auxiliary hoist shall be provided to permit men to escape quickly in the event of an emergency.

(g) No person shall be permitted to ride the rim of any bucket or on the top of a loaded bucket.

(h) The number of persons permitted to ride in cages, skips, or buckets shall be limited so as to prevent overcrowding.

(i) Persons shall not be permitted to ride on a cage, skip, or bucket with tools or materials, except when necessary to handle equipment while in transit. Materials shall be secured to prevent shifting while being hoisted.

(j) The speed of buckets transporting persons shall not exceed 500 feet per minute and not more than 200 feet per minute when within 100 feet of any stop.

(k) A notice of established speeds shall be posted in clear view of the hoistman.

(l) Conveyances being lowered in a shaft in which men are working shall be stopped at least 15 feet above such men and shall be lowered further only after the hoistman has received a signal that all men who may be endangered by the conveyance are in the clear.

(m) No skip or bucket shall be raised or lowered in a slope or shaft until it has been trimmed to prevent material from falling back down the slope or shaft.

(n) Measures shall be taken to prevent material from falling back into the shaft while buckets or other conveyances are being unloaded.

(o) Properly attached safety belts shall be worn by all persons required to work in or over any shaft where there is a drop of 10 or more feet, unless other acceptable means are provided to prevent such persons from falling into the shaft.

§ 77.1908-1 Hoist operation; qualified hoistman.

Hoists shall be under the control of and operated by a qualified hoistman when men are in a slope or shaft.

§ 77.1909 Explosives and blasting; use of permissible explosives and shot-firing units.

Except as provided in § 77.1909-1, only permissible explosives and permissible shot-firing units shall be used in sinking shafts and slopes.

§ 77.1909-1 Use of nonpermissible explosives and nonpermissible shot-firing units; approval by Health and Safety District Manager.

Where the Coal Mine Health and Safety District Manager has determined that the use of nonpermissible explosives and nonpermissible shot-firing units will not pose a hazard to any person during the development of a slope or shaft, he may, after written application by the operator, approve the use of such explosives and shot-firing units and issue a permit for the use of such explosives and devices setting forth the safeguards to be employed by the operator to protect the health and safety of any person exposed to such blasting.

(Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq.))

[36 FR 9364, May 22, 1971, as amended at 60 FR 33723, June 29, 1995]

§ 77.1910 Explosives and blasting; general.

(a) Light and power circuits shall be disconnected or removed from the blasting area before charging and blasting.

(b) All explosive materials, detonators, and any other related blasting material employed in the development of any slope or shaft shall be stored, transported, carried, charged, and fired in accordance with the provision of Subpart N, “Explosives and Blasting,” of this Part 77. Except as provided in paragraph (c) of this section, all shots shall be fired from the surface.

(c) Where tests for methane have been conducted and methane has not been found and only permissible blasting units are being employed, shots may be fired from an upper level of the slope or shaft.

(d) Except as provided in paragraph (c) of this section, all men shall be removed from the slope or shaft prior to blasting.

(e) Blasting areas in slopes or shafts shall be covered with mats or other suitable material when the excavation is too shallow to retain blasted material.

(f) Where it is impracticable to prepare primers in the blasting area, primers may be prepared on the surface and carried into the shaft in specially constructed, insulated, covered containers.

(g) No other development operation shall be conducted in a shaft or at the face of a slope while drill holes are being charged and until after all shots have been fired.

(h) The sides of the slope or shaft between the overhead platform and the bottom where men are working shall be examined after each blast and loose material removed.

(i) Loose rock and other material shall be removed from timbers and platforms after each blast before men are lowered to the shaft bottom.

§ 77.1911 Ventilation of slopes and shafts.

(a) All slopes and shafts shall be ventilated by mechanical ventilation equipment during development. Such equipment shall be examined before each shift and the quantity of air in the slope or shaft measured daily by a certified person and the results of such examinations and tests recorded in a book approved by the Secretary.

(b) Ventilation fans shall be:

(1) Installed on the surface;

(2) Installed in fireproof housing and connected to the slope or shaft opening with fireproof air ducts;

(3) Designed to permit the reversal of the air current, and located in an area which will prevent a recirculation of air from the slope or shaft or air contamination from any other source;

(4) Equipped with an automatic signal device designed to give an alarm in the event the fan slows or stops which can be seen or heard by any person on duty in the vicinity of the fan, except where fans are constantly attended.

(5) Offset not less than 15 feet from the shaft; and

(6) Equipped with air ducts which are fire resistant and maintained so as to prevent excessive leakage of air;

(i) Flexible ducts shall be constructed to permit ventilation by either exhausting or blowing methods and when metal air ducts are used, they shall be grounded effectively to remove static and other electrical charges;

(ii) Ducts shall extend as close to the bottom as necessary to ventilate properly.

(c) A qualified person, designated by the operator, shall be assigned to maintain each ventilating system.

(d) The fan shall be operated continuously when men are below the surface. Any accidental stoppage or reduction in airflow shall be corrected promptly; however, where repairs cannot be made immediately, development work below the surface shall be stopped and all the men not needed to make necessary repairs shall be removed to the surface.

§ 77.1912 Ladders and stairways.

(a) Substantial stairways or ladders shall be used during the construction of all shafts where no mechanical means are provided for men to travel.

(b) Landings at intervals of not more than 30 feet shall be installed.

(c) Shaft ladders shall project 3 feet above the collar of the shaft, and shall be placed at least 3 inches from the side of the shaft.

§ 77.1913 Fire-resistant wood.

Except for crossties, timbers, and other wood products which are permanently installed in slopes and shafts, shall be fire resistant.

§ 77.1914 Electrical equipment.

(a) Electric equipment employed below the collar of a slope or shaft during excavation shall be permissible and shall be maintained in a permissible condition.

(b) The insulation of all electric conductors employed below the collar of any slope or shaft during excavation shall be of the flame resistant type.

(c) Only lamps and portable flood lights approved by the Bureau of Mines or the Mine Safety and Health Administration under Part 19 and Part 20 of this chapter (Bureau of Mines Schedules 6D and 10C) shall be employed below the collar of any slope or shaft.

§ 77.1915 Storage and handling of combustible materials.

(a) Compressed and liquefied gas, oil, gasoline, and other petroleum products shall not be stored within 100 feet of any slope or shaft opening.

(b) Other combustible material and supplies shall not be stored within 25 feet of any slope or shaft opening.

(c) Pyritic slates, bony coal, culm or other material capable of spontaneous combustion shall not be used for fill or as surfacing material within 100 feet of any slope or shaft opening.

(d) Areas surrounding the opening of each slope or shaft shall be constructed to insure the drainage of flammable liquids away from the slope or shaft in the event of spillage.

(e) Oily rags, waste, waste paper, and other combustible waste material disposed of in the vicinity of any slope or shaft opening shall be stored in closed containers until removed from the area.

§ 77.1916 Welding, cutting, and soldering; fire protection.

(a) One portable fire extinguisher shall be provided where welding, cutting, or soldering with arc or flame is performed.

(b) Welding, cutting, or soldering with arc or flame within or in the vicinity of any slope or shaft, except where such operations are performed in fireproof enclosures, shall be done under the supervision of a qualified person who shall make a diligent search within or in the vicinity of the slope or shaft for fire during and after such operations.

(c) Before welding, cutting, or soldering is performed in any slope or shaft designed to penetrate into any coalbed below the surface, an examination for methane shall be made by a qualified person with a device approved by the Secretary for detecting methane. Examination for methane shall be made immediately before and periodically during welding, cutting, or soldering and such work shall not be permitted to commence or continue in air which contains 1.0 volume per centum or more of methane.

(d) Noncombustible barriers shall be installed below welding, cutting, or soldering operations in or over a shaft.

Subpart U Approved Books and Records [Reserved]
Subpart V Safety Program for Surface Mobile Equipment

Source: 88 FR 87928, Dec. 20, 2023, unless otherwise noted.

§ 77.2100 Purpose and scope.

This subpart requires operators to develop, implement, and update a written safety program for surface mobile equipment to reduce the number and rates of accidents, injuries, and fatalities. This subpart applies to surface mobile equipment at surface coal mines and surface work areas of underground coal mines. The purpose of this safety program is to promote and support a positive safety culture and improve miners' safety at the mine.

§ 77.2101 Definitions.

The following definitions apply in this subpart—

Responsible person means a person with authority and responsibility to evaluate and update a written safety program for surface mobile equipment.

Surface mobile equipment means wheeled, skid-mounted, track-mounted, or rail-mounted equipment capable of moving or being moved, and any powered equipment that transports people, equipment, or materials, excluding belt conveyors, at surface coal mines and surface work areas of underground coal mines.

§ 77.2102 Written safety program.

(a) Each operator shall develop and implement a written safety program for surface mobile equipment that contains the elements in this subpart, no later than July 17, 2024.

(b) Each operator shall designate at least one responsible person to evaluate and update the written safety program, no later than July 17, 2024.

§ 77.2103 Requirements for written safety program.

(a) The operator shall develop and implement a written safety program that includes actions the operator will take to:

(1) Identify and analyze hazards and reduce the resulting risks related to the movement and the operation of surface mobile equipment;

(2) Develop and maintain procedures and schedules for routine maintenance and non-routine repairs for surface mobile equipment;

(3) Identify currently available and newly emerging feasible technologies that can enhance safety at the mine and evaluate whether to adopt them; and

(4) Train miners and other persons at the mine necessary to perform work to identify and address or avoid hazards related to surface mobile equipment.

(b) The responsible person shall evaluate and update the written safety program at least annually, or as mining conditions or practices change that may adversely affect the health and safety of miners or other persons, as accidents or injuries occur, or as surface mobile equipment changes or modifications are made.

(c) The operator shall solicit input from miners and their representatives in developing and updating the written safety program.

§ 77.2104 Record and inspection.

(a) The operator shall make the written safety program available for inspection by authorized representatives of the Secretary and provide a copy upon request.

(b) The operator shall make the written safety program available for inspection by miners and their representatives and, at no cost, provide a copy upon request.

PART 90 MANDATORY HEALTH STANDARDS—COAL MINERS WHO HAVE EVIDENCE OF THE DEVELOPMENT OF PNEUMOCONIOSIS

Authority: 30 U.S.C. 811, 813(h), 957.

Source: 45 FR 80769, Dec. 5, 1980, unless otherwise noted.

Subpart A General

Source: 79 FR 24988, May 1, 2014, unless otherwise noted.

§ 90.1 Scope.

This part 90 establishes the option of miners who are employed at coal mines and who have evidence of the development of pneumoconiosis to work in an area of a mine where the average concentration of respirable dust in the mine atmosphere during each shift is continuously maintained at or below the applicable standard as specified in § 90.100. The rule sets forth procedures for miners to exercise this option, and establishes the right of miners to retain their regular rate of pay and receive wage increases. The rule also sets forth the operator's obligations, including respirable dust sampling for part 90 miners. This part 90 is promulgated pursuant to section 101 of the Act and supersedes section 203(b) of the Federal Mine Safety and Health Act of 1977, as amended.

§ 90.2 Definitions.

As April 14, 2025, the following definitions apply in this part:

Act. The Federal Mine Safety and Health Act of 1977, Public Law 91-173, as amended by Public Law 95-164 and Public Law 109-236.

Active workings. Any place in a coal mine where miners are normally required to work or travel.

Approved sampling device. A sampling device approved by the Secretary and Secretary for Health and Human Services (HHS) under part 74 of this subchapter.

Certified person. An individual certified by the Secretary in accordance with § 90.202 to take respirable dust samples required by this part or certified in accordance with § 90.203 to perform the maintenance and calibration of respirable dust sampling equipment as required by this part.

Coal mine dust personal sampler unit (CMDPSU). A personal sampling device approved under part 74, subpart B, of this subchapter.

Concentration. A measure of the amount of a substance contained per unit volume of air.

Continuous personal dust monitor (CPDM). A personal sampling device approved under part 74, subpart C, of this subchapter.

District Manager. The manager of the Coal Mine Safety and Health District in which the mine is located.

Equivalent concentration. The concentration of respirable coal mine dust, including quartz, expressed in milligrams per cubic meter of air (mg/m 3) as measured with an approved sampling device, determined by dividing the weight of dust in milligrams collected on the filter of an approved sampling device by the volume of air in cubic meters passing through the filter (sampling time in minutes (t) times the sampling airflow rate in cubic meters per minute), and then converting that concentration to an equivalent concentration as measured by the Mining Research Establishment (MRE) instrument. When the approved sampling device is:

(1) The CMDPSU, the equivalent concentration is determined by multiplying the concentration of respirable coal mine dust by the constant factor prescribed by the Secretary.

(2) The CPDM, the device shall be programmed to automatically report end-of-shift concentration measurements as equivalent concentrations.

Mechanized mining unit (MMU). A unit of mining equipment including hand loading equipment used for the production of material; or a specialized unit which uses mining equipment other than specified in § 70.206(b) or in § 70.208(b) of this subchapter. Each MMU will be assigned a four-digit identification number by MSHA, which is retained by the MMU regardless of where the unit relocates within the mine. However, when:

(1) Two sets of mining equipment are used in a series of working places within the same working section and only one production crew is employed at any given time on either set of mining equipment, the two sets of equipment shall be identified as a single MMU.

(2) Two or more sets of mining equipment are simultaneously engaged in cutting, mining, or loading coal or rock from working places within the same working section, each set of mining equipment shall be identified as a separate MMU.

MRE instrument. The gravimetric dust sampler with a four channel horizontal elutriator developed by the Mining Research Establishment of the National Coal Board, London, England.

MSHA. The Mine Safety and Health Administration of the U.S. Department of Labor.

Normal work duties. Duties which the part 90 miner performs on a routine day-to-day basis in his or her job classification at a mine.

Part 90 miner. A miner employed at a coal mine who has exercised the option under the old section 203(b) program (30 CFR part 90, effective as of July 1, 1972), or under § 90.3 to work in an area of a mine where the average concentration of respirable dust in the mine atmosphere during each shift to which that miner is exposed is continuously maintained at or below the standard, and who has not waived these rights.

Representative sample. A respirable dust sample, expressed as an equivalent concentration, that reflects typical dust concentration levels in the working environment of the part 90 miner when performing normal work duties.

Respirable dust. Dust collected with a sampling device approved by the Secretary and the Secretary of HHS in accordance with part 74 (Coal Mine Dust Sampling Devices) of this subchapter.

Secretary. The Secretary of Labor or a delegate.

Secretary of Health and Human Services. The Secretary of Health and Human Services (HHS) or the Secretary of Health, Education, and Welfare.

Transfer. Any change in the work assignment of a part 90 miner by the operator and includes:

(1) Any change in occupation code of a part 90 miner;

(2) any movement of a part 90 miner to or from an MMU; or

(3) any assignment of a part 90 miner to the same occupation in a different location at a mine.

Valid respirable dust sample. A respirable dust sample collected and submitted as required by this part, including any sample for which the data were electronically transmitted to MSHA, and not voided by MSHA.

[89 FR 28481, 28482, Apr. 18, 2024]

§ 90.3 Part 90 option; notice of eligibility; exercise of option.

Effective April 14, 2025:

(a) Any miner employed at a coal mine who, in the judgment of the Secretary of HHS, has evidence of the development of pneumoconiosis based on a chest X-ray, read and classified in the manner prescribed by the Secretary of HHS, or based on other medical examinations shall be afforded the option to work in an area of a mine where the average concentration of respirable dust in the mine atmosphere during each shift to which that miner is exposed is continuously maintained at or below the standard. Each of these miners shall be notified in writing of eligibility to exercise the option.

(b) Any miner who is a section 203(b) miner on January 31, 1981, shall be a part 90 miner on February 1, 1981, entitled to full rights under this part to retention of pay rate, future actual wage increases, and future work assignment, shift and respirable dust protection.

(c) Any part 90 miner who is transferred to a position at the same or another coal mine shall remain a part 90 miner entitled to full rights under this part at the new work assignment.

(d) The option to work in a low dust area of the mine may be exercised for the first time by any miner employed at a coal mine who was eligible for the option under the old section 203(b) program (www.msha.gov/REGSTECHAMEND.htm), or is eligible for the option under this part by sending a written request to the Chief, Division of Health, Mine Safety and Health Enforcement, MSHA, 200 Constitution Avenue NW, Washington, DC 20210.

(e) The option to work in a low dust area of the mine may be re-exercised by any miner employed at a coal mine who exercised the option under the old section 203(b) program (www.msha.gov/REGSTECHAMEND.htm) or exercised the option under this part by sending a written request to the Chief, Division of Health, Mine Safety and Health Enforcement, MSHA, 200 Constitution Avenue NW, Washington, DC 20210. The request should include the name and address of the mine and operator where the miner is employed.

(f) No operator shall require from a miner a copy of the medical information received from the Secretary or Secretary of HHS.

[89 FR 28482, Apr. 18, 2024, as amended at 91 FR 9449, Feb. 26, 2026]

Subpart B Dust Standards, Rights of Part 90 Miners

Source: 79 FR 24989, May 1, 2014, unless otherwise noted.

§ 90.100 Respirable dust standard.

The following is required as of April 14, 2025. After the 20th calendar day following receipt of notification from MSHA that a part 90 miner is employed at the mine, the operator shall continuously maintain the average concentration of respirable dust in the mine atmosphere during each shift to which the part 90 miner in the active workings of the mine is exposed, as measured with an approved sampling device and expressed in terms of an equivalent concentration, at or below 0.5 mg/m 3.

[89 FR 28482, Apr. 18, 2024]

§ 90.101 [Reserved]
§ 90.102 Transfer; notice.

As of April 14, 2025:

(a) Whenever a part 90 miner is transferred in order to meet the standard, the operator shall transfer the miner to an existing position at the same coal mine on the same shift or shift rotation on which the miner was employed immediately before the transfer. The operator may transfer a part 90 miner to a different coal mine, a newly created position or a position on a different shift or shift rotation if the miner agrees in writing to the transfer. The requirements of this paragraph do not apply when the respirable dust concentration in a part 90 miner's work position complies with the standard but circumstances, such as reductions in workforce or changes in operational status, require a change in the miner's job or shift assignment.

(b) On or before the 20th calendar day following receipt of notification from MSHA that a part 90 miner is employed at the mine, the operator shall give the District Manager written notice of the occupation and, if applicable, the MMU unit to which the part 90 miner shall be assigned on the 21st calendar day following receipt of the notification from MSHA.

(c) After the 20th calendar day following receipt of notification from MSHA that a part 90 miner is employed at the mine, the operator shall give the District Manager written notice before any transfer of a part 90 miner. This notice shall include the scheduled date of the transfer.

[89 FR 28482, 28483, Apr. 18, 2024]

§ 90.103 Compensation.

(a) The operator shall compensate each part 90 miner at not less than the regular rate of pay received by that miner immediately before exercising the option under § 90.3.

(b) Whenever a part 90 miner is transferred, the operator shall compensate the miner at not less than the regular rate of pay received by that miner immediately before the transfer.

(c) Once a miner has been placed in a position in compliance with the provisions of part 90, paragraphs (a) and (b) of this section do not apply when the part 90 miner initiates and accepts a change in work assignment for reasons of job preference.

(d) The operator shall compensate each miner who is a section 203(b) miner on January 31, 1981, at not less than the regular rate of pay that the miner is required to receive under section 203(b) of the Act immediately before the effective date of this part.

(e) In addition to the compensation required to be paid under paragraphs (a), (b), and (d) of this section, the operator shall pay each part 90 miner the actual wage increases that accrue to the classification to which the miner is assigned.

(f) If a miner is temporarily employed in an occupation other than his or her regular work classification for two months or more before exercising the option under § 90.3, the miner's regular rate of pay for purposes of paragraph (a) and (b) of this section is the higher of the temporary or regular rates of pay. If the temporary assignment is for less than two months, the operator may pay the part 90 miner at his or her regular work classification rate regardless of the temporary wage rate.

(g) If a part 90 miner is transferred, and the Secretary subsequently notifies the miner that notice of the miner's eligibility to exercise the part 90 option was incorrect, the operator shall retain the affected miner in the current position to which the miner is assigned and continue to pay the affected miner the applicable rate of pay provided in paragraphs (a), (b), (d), and (e) of this section, until:

(1) The affected miner and operator agree in writing to a position with pay at not less than the regular rate of pay for that occupation; or

(2) A position is available at the same coal mine in both the same occupation and on the same shift on which the miner was employed immediately before exercising the option under § 90.3 or under the old section 203(b) program (36 FR 20601, October 27, 1971).

(i) When such a position is available, the operator shall offer the available position in writing to the affected miner with pay at not less than the regular rate of pay for that occupation.

(ii) If the affected miner accepts the available position in writing, the operator shall implement the miner's reassignment upon notice of the miner's acceptance. If the miner does not accept the available position in writing, the miner may be reassigned and protections under part 90 shall not apply. Failure by the miner to act on the written offer of the available position within 15 days after notice of the offer is received from the operator shall operate as an election not to accept the available position.

§ 90.104 Waiver of rights; re-exercise of option.

As of April 14, 2025:

(a) A part 90 miner may waive his or her rights and be removed from MSHA's active list of miners who have rights under part 90 by:

(1) Giving written notification to the Chief, Division of Health, Mine Safety and Health Enforcement, MSHA, that the miner waives all rights under this part;

(2) Applying for and accepting a position in an area of a mine which the miner knows has an average respirable dust concentration exceeding the standard; or

(3) Refusing to accept another position offered by the operator at the same coal mine that meets the requirements of §§ 90.100, 90.101 and 90.102(a) after dust sampling shows that the present position exceeds the applicable standard.

(b) If rights under part 90 are waived, the miner gives up all rights under part 90 until the miner re-exercises the option in accordance with § 90.3(e) (Part 90 option; notice of eligibility; exercise of option).

(c) If rights under part 90 are waived, the miner may re-exercise the option under this part in accordance with § 90.3(e) (Part 90 option; notice of eligibility; exercise of option) at any time.

[89 FR 28483, Apr. 18, 2024]

Subpart C Sampling Procedures

Source: 79 FR 24990, May 1, 2014, unless otherwise noted.

§ 90.201 Sampling; general and technical requirements.

(a) An approved coal mine dust personal sampler unit (CMDPSU) shall be used to take samples of the concentration of respirable coal mine dust in the working environment of each part 90 miner as required by this part. On February 1, 2016, part 90 miners shall be sampled only with an approved continuous personal dust monitor (CPDM) as required by this part and an approved CMDPSU shall not be used, unless notified by the Secretary to continue to use an approved CMDPSU to conduct quarterly sampling.

(b) If using a CMDPSU, the sampling device shall be worn or carried to and from each part 90 miner. If using a CPDM, the sampling device shall be worn by the part 90 miner at all times. Approved sampling devices shall be operated portal-to-portal and shall remain operational during the part 90 miner's entire shift, which includes the time spent performing normal work duties and while traveling to and from the assigned work location. If the work shift to be sampled is longer than 12 hours and the sampling device is:

(1) A CMDPSU, the operator shall switch-out the unit's sampling pump prior to the 13th-hour of operation.

(2) A CPDM, the operator shall switch-out the CPDM with a fully charged device prior to the 13th-hour of operation.

(c) Unless otherwise directed by the District Manager, the respirable dust samples required under this part using a CMDPSU shall be taken by placing the sampling device as follows:

(1) On the part 90 miner;

(2) On the piece of equipment which the part 90 miner operates within 36 inches of the normal working position; or

(3) At a location that represents the maximum concentration of dust to which the part 90 miner is exposed.

(d) If using a CMDPSU, one control filter shall be used for each shift of sampling. Each control filter shall:

(1) Have the same pre-weight date (noted on the dust data card) as the filter used for sampling;

(2) Remain plugged at all times;

(3) Be used for the same amount of time, and exposed to the same temperature and handling conditions as the filter used for sampling; and

(4) Be kept with the exposed samples after sampling and in the same mailing container when transmitted to MSHA.

(e) The respirable dust samples required by this part and taken with a CMDPSU shall be collected while the part 90 miner is performing normal work duties.

(f) Records showing the length of each shift for each part 90 miner shall be made and retained for at least six months, and shall be made available for inspection by authorized representatives of the Secretary and submitted to the District Manager when requested in writing.

(g) Upon request from the District Manager, the operator shall submit the date and time any respirable dust sampling required by this part will begin. This information shall be submitted at least 48 hours prior to scheduled sampling.

(h) Operators using CPDMs shall provide training to all part 90 miners. The training shall be completed prior to a part 90 miner wearing a CPDM and then every 12 months thereafter. The training shall include:

(1) The importance of monitoring dust concentrations and properly wearing the CPDM;

(2) Explaining the basic features and capabilities of the CPDM;

(3) Discussing the various types of information displayed by the CPDM and how to access that information; and

(4) How to start and stop a short-term sample run during compliance sampling.

(i) An operator shall keep a record of the CPDM training at the mine site for 24 months after completion of the training. An operator may keep the record elsewhere if the record is immediately accessible from the mine site by electronic transmission. Upon request from an authorized representative of the Secretary or Secretary of HHS, the operator shall promptly provide access to any such training records. The record shall include:

(1) The date of training;

(2) The names of miners trained; and

(3) The subjects included in the training.

(j) An anthracite mine using the full box, open breast, or slant breast mining method may use either a CPDM or a CMDPSU to conduct the required sampling. The mine operator shall notify the District Manager in writing of its decision to not use a CPDM.

§ 90.202 Certified person; sampling.

(a) The respirable dust sampling required by this part shall be performed by a certified person.

(b) To be certified, a person shall complete the applicable MSHA course of instruction and pass the MSHA examination demonstrating competency in sampling procedures. Persons not certified in sampling and those certified only in maintenance and calibration procedures in accordance with § 90.203(b) are not permitted to collect respirable dust samples required by this part or handle approved sampling devices when being used in sampling.

(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in sampling procedures every three years.

(d) MSHA may revoke a person's certification for failing to properly carry out the required sampling procedures.

§ 90.203 Certified person; maintenance and calibration.

(a) Approved sampling devices shall be maintained and calibrated by a certified person.

(b) To be certified, a person shall complete the applicable MSHA course of instruction and pass the MSHA examination demonstrating competency in maintenance and calibration procedures for approved sampling devices. Necessary maintenance of the sampling head assembly of a CMDPSU, or the cyclone assembly of a CPDM, can be performed by persons certified in sampling or in maintenance and calibration.

(c) To maintain certification, a person must pass the MSHA examination demonstrating competency in maintenance and calibration procedures every three years.

(d) MSHA may revoke a person's certification for failing to properly carry out the required maintenance and calibration procedures.

§ 90.204 Approved sampling devices; maintenance and calibration.

(a) Approved sampling devices shall be maintained as approved under part 74 of this title and calibrated in accordance with MSHA Informational Report IR 1240 (1996) “Calibration and Maintenance Procedures for Coal Mine Respirable Dust Samplers” or in accordance with the manufacturer's recommendations if using a CPDM. Only persons certified in maintenance and calibration can perform maintenance on the CPDM or the pump unit of the CMDPSU.

(b) Approved sampling devices shall be calibrated at the flowrate of 2.0 liters of air per minute (L/min) if using a CMDPSU; at 2.2 L/min if using a CPDM; or at a different flowrate recommended by the manufacturer, before they are put into service and, thereafter, at time intervals recommended by the manufacturer or prescribed by the Secretary or Secretary of HHS.

(c) If using a CMDPSU, sampling devices shall be examined and tested by a person certified in sampling or in maintenance and calibration within 3 hours before the start of the shift on which the approved sampling devices will be used to collect respirable dust samples. This is to assure that the sampling devices are clean and in proper working condition. This examination and testing shall include the following:

(1) Examination of all components of the cyclone assembly to assure that they are clean and free of dust and dirt. This includes examining the interior of the connector barrel (located between the cassette assembly and vortex finder), vortex finder, cyclone body, and grit pot;

(2) Examination of the inner surface of the cyclone body to assure that it is free of scoring or scratch marks on the inner surface of the cyclone where the air flow is directed by the vortex finder into the cyclone body;

(3) Examination of the external hose connecting the pump unit to the sampling head assembly to assure that it is clean and free of leaks; and

(4) Examination of the clamping and positioning of the cyclone body, vortex finder, and cassette to assure that they are rigid, in alignment, firmly in contact, and airtight.

(5) Testing the voltage of each battery while under actual load to assure the battery is fully charged. This requires that a fully assembled and examined sampling head assembly be attached to the pump inlet with the pump unit running when the voltage check is made. The voltage for batteries used in the CMDPSU shall not be lower than the product of the number of cells in the battery multiplied by the manufacturer's nominal voltage per cell.

(d) If using a CPDM, the certified person in sampling or in maintenance and calibration shall:

(1) Follow the pre-operational examinations, testing, and set-up procedures, and perform necessary external maintenance recommended by the manufacturer to assure the operational readiness of the CPDM within 3 hours before the start of the shift on which the sampling device will be used to collect respirable dust samples; and

(2) Perform other required scheduled examinations and maintenance procedures recommended by the manufacturer.

(e) You must proceed in accordance with “Calibration and Maintenance Procedures for Coal Mine Respirable Dust Samplers,” MSHA Informational Report IR 1240 (1996), referenced in paragraph (a) of this section. The Director of the Federal Register approves this incorporation by reference in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may obtain a copy from the MSHA Web site at http://www.msha.gov and you may inspect or obtain a copy at MSHA, Coal Mine Safety and Health, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9500; and at each MSHA Coal Mine Safety and Health District Office, or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.

[79 FR 24990, May 1, 2014, as amended at 80 FR 52993, Sept. 2, 2015; 91 FR 9449, Feb. 26, 2026]

§ 90.205 Approved sampling devices; operation; air flowrate.

As of April 14, 2025:

(a) Approved sampling devices shall be operated at the flowrate of 2.0 L/min if using a CMDPSU; at 2.2 L/min if using a CPDM; or at a different flowrate recommended by the manufacturer.

(b) If using a CMDPSU, each approved sampling device shall be examined each shift, by a person certified in sampling during:

(1) The second hour after being put into operation to assure it is in the proper location, operating properly, and at the proper flowrate. If the proper flowrate is not maintained, necessary adjustments shall be made by the certified person. This examination is not required if the sampling device is being operated in an anthracite coal mine using the full box, open breast, or slant breast mining method.

(2) The last hour of operation to assure that the sampling device is operating properly and at the proper flowrate. If the proper flowrate is not maintained, the respirable dust sample shall be transmitted to MSHA with a notation by the certified person on the back of the dust data card stating that the proper flowrate was not maintained. Other events occurring during the collection of respirable dust samples that may affect the validity of the sample, such as dropping of the sampling head assembly onto the mine floor, shall be noted on the back of the dust data card.

(c) If using a CPDM, the person certified in sampling shall monitor the dust concentrations and the sampling status conditions being reported by the sampling device at mid-shift or more frequently as specified in the approved respirable dust control plan, if applicable, to assure: The sampling device is in the proper location and operating properly; and the work environment of the Part 90 miner being sampled remains in compliance with the standard at the end of the shift. This monitoring is not required if the sampling device is being operated in an anthracite coal mine using the full box, open breast, or slant breast mining method.

[89 FR 28483, 28484, Apr. 18, 2024]

§ 90.206 Exercise of option or transfer sampling.

(a) The operator shall take five valid representative dust samples for each part 90 miner within 15 calendar days after:

(1) The 20-day period specified for each part 90 miner in § 90.100; and

(2) Implementing any transfer after the 20th calendar day following receipt of notification from MSHA that a part 90 miner is employed at the mine.

(b) Noncompliance with the standard shall be determined in accordance with § 90.207(d).

(c) Upon issuance of a citation for a violation of the standard, the operator shall comply with § 90.207(f).

[89 FR 28484, Apr. 18, 2024]

§ 90.207 Quarterly sampling.

As of April 14, 2025:

(a) Each operator shall take five valid representative samples every calendar quarter from the environment of each part 90 miner while performing normal work duties. Part 90 miner samples shall be collected on consecutive work days. The quarterly periods are:

(1) January 1-March 31

(2) April 1-June 30

(3) July 1-September 30

(4) October 1-December 31.

(b) [Reserved]

(c) When a valid representative sample taken in accordance with this section meets or exceeds the ECV in table 1 to this section corresponding to the particular sampling device used, the mine operator shall:

(1) Make approved respiratory equipment available to affected miners in accordance with § 72.700 of this chapter;

(2) Immediately take corrective action to lower the concentration of respirable coal mine dust to below the standard; and

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the part 90 miner.

(d) Noncompliance with the standard is demonstrated during the sampling period when:

(1) Two or more valid representative samples meet or exceed the ECV in table 1 to this section that corresponds to the particular sampling device used; or

(2) The average for all valid representative samples meets or exceeds the ECV in table 1 to this section that corresponds to the particular sampling device used.

(e) Unless otherwise directed by the District Manager, upon issuance of a citation for a violation of the standard, paragraph (a) of this section shall not apply to that Part 90 miner until the violation is abated and the citation is terminated in accordance with paragraphs (e) and (f) of this section.

(f) Upon issuance of a citation for a violation of the standard, the operator shall take the following actions sequentially:

(1) Make approved respiratory equipment available to the affected part 90 miner in accordance with § 72.700 of this subchapter.

(2) Immediately take corrective action to lower the concentration of respirable dust to below the standard. If the corrective action involves:

(i) Reducing the respirable dust levels in the work position of the part 90 miner identified in the citation, the operator shall implement the proposed corrective actions and begin sampling the affected miner within 8 calendar days after the date the citation is issued, until five valid representative samples are taken.

(ii) Transferring the Part 90 miner to another work position at the mine to meet the standard, the operator shall comply with § 90.102 and then sample the affected miner in accordance with § 90.206(a).

(3) Make a record of the corrective actions taken. The record shall be certified by the mine foreman or equivalent mine official, no later than the end of the mine foreman's or equivalent official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration. Such records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the part 90 miner.

(g) A citation for a violation of the standard shall be terminated by MSHA when the equivalent concentration of each of the five valid representative samples is below the standard.

Table 1 to § 90.207—Excessive Concentration Values (ECV) Based on a Single Sample, Two Samples, or the Average of Five Full-Shift CMDPSU/CPDM Concentration Measurements

Section | Samples | ECV (mg/m 3)

CMDPSU | CPDM

90.207(c) | Single sample | 0.74 | 0.57

90.207(d)(1) | 2 or more samples | 0.74 | 0.57

90.207(d)(2) | 5 sample average | 0.61 | 0.53

90.207(g) | Each of 5 samples | 0.74 | 0.57

[89 FR 28484, 28485, Apr. 18, 2024]

§ 90.208 Respirable dust samples; transmission by operator.

(a) If using a CMDPSU, the operator shall transmit within 24 hours after the end of the sampling shift all samples collected to fulfill the requirements of this part, including control filters, in containers provided by the manufacturer of the filter cassette to: Respirable Dust Processing Laboratory, Pittsburgh Safety and Health Technology Center, 626 Cochrans Mill Road, Building 38, Pittsburgh, PA 15236-3611, or to any other address designated by the District Manager.

(b) The operator shall not open or tamper with the seal of any filter cassette or alter the weight of any filter cassette before or after it is used to fulfill the requirements of this part.

(c) A person certified in sampling shall properly complete the dust data card that is provided by the manufacturer for each filter cassette. The card shall have an identification number identical to that on the cassette used to take the sample and be submitted to MSHA with the sample. Each card shall be signed by the certified person who actually performed the required examinations under 90.205(b) of this part during the sampling shift and shall include that person's MSHA Individual Identification Number (MIIN). Respirable dust samples with data cards not properly completed may be voided by MSHA.

(d) All respirable dust samples collected by the operator shall be considered taken to fulfill the sampling requirements of part 70, 71, or 90 of this title, unless the sample has been identified in writing by the operator to the District Manager, prior to the intended sampling shift, as a sample to be used for purposes other than required by part 70, 71, or 90 of this title.

(e) Respirable dust samples received by MSHA in excess of those required by this part shall be considered invalid samples.

(f) If using a CPDM, the person certified in sampling shall (1) validate, certify, and transmit electronically to MSHA within 24 hours after the end of each sampling shift all sample data file information collected and stored in the CPDM, including the sampling status conditions encountered when sampling each part 90 miner; and (2) not tamper with the CPDM or its components in any way before, during, or after it is used to fulfill the requirements of this part, or alter any data files. All CPDM data files transmitted electronically to MSHA shall be maintained by the operator for at least 12 months.

[79 FR 24988, May 1, 2014, as amended at 80 FR 52993, Sept. 2, 2015]

§ 90.209 Respirable dust samples; report to operator.

(a) MSHA shall provide the operator, as soon as practicable, a report with the following data on respirable dust samples submitted or whose results were transmitted electronically, if using a CPDM, in accordance with this part:

(1) The mine identification number;

(2) The locations within the mine from which the samples were taken;

(3) The concentration of respirable dust, expressed as an equivalent concentration for each valid sample;

(4) The average equivalent concentration of respirable dust for all valid samples;

(5) The occupation code;

(6) The reason for voiding any sample; and

(7) The part 90 miner's MSHA Individual Identification Number (MIIN).

(b) Upon receipt, the operator shall provide a copy of this report to the part 90 miner. The operator shall not post the original or a copy of this report on the mine bulletin board.

(c) If using a CPDM, the person certified in sampling shall print, sign, and provide to each part 90 miner, a paper record (Dust Data Card) of the sample run within one hour after the start of the part 90 miner's next work shift. This hard-copy record shall include the data entered when the sample run was first programmed, and the following:

(1) The mine identification number;

(2) The location within the mine from which the sample was taken;

(3) The concentration of respirable dust, expressed as an equivalent concentration reported and stored for each sample;

(4) The sampling status conditions encountered for each sample;

(5) The shift length; and

(6) The part 90 miner's MSHA Individual Identification Number (MIIN).

(d) The operator shall not post data on respirable dust samples for part 90 miners on the mine bulletin board.

§ 90.210 Status change reports.

If there is a change in the status of a part 90 miner (such as entering a terminated, injured, or ill status, or returning to work), the operator shall report the change in the status of the part 90 miner to the MSHA District Office or to any other MSHA office designated by the District Manager. Status changes shall be reported in writing or by electronic means within 3 working days after the status change has occurred.

Subpart D Respirable Dust Control Plans

Source: 79 FR 24993, May 1, 2014, unless otherwise noted.

§ 90.300 Respirable dust control plan; filing requirements.

As of April 14, 2025:

(a) If an operator abates a violation of the standard by reducing the respirable dust level in the position of the Part 90 miner, the operator shall submit to the District Manager for approval a written respirable dust control plan for the Part 90 miner in the position identified in the citation within 15 calendar days after the citation is terminated. The respirable dust control plan and revisions thereof shall be suitable to the conditions and the mining system of the coal mine and shall be adequate to continuously maintain respirable dust below the standard for that Part 90 miner.

(b) Each respirable dust control plan shall include at least the following:

(1) The mine identification number assigned by MSHA, the operator's name, mine name, mine address, and mine telephone number and the name, address and telephone number of the principal officer in charge of health and safety at the mine;

(2) The name and MSHA Individual Identification Number of the part 90 miner and the position at the mine to which the plan applies;

(3) A detailed description of how each of the respirable dust control measures used to continuously maintain concentrations of respirable coal mine dust below the standard; and

(4) A detailed description of how each of the respirable dust control measures described in response to paragraph (b)(3) of this section will continue to be used by the operator, including at least the specific time, place, and manner the control measures will be used.

[89 FR 28485, Apr. 18, 2024]

§ 90.301 Respirable dust control plan; approval by District Manager; copy to part 90 miner.

As of April 14, 2025:

(a) The District Manager will approve respirable dust control plans on a mine-by-mine basis. When approving respirable dust control plans, the District Manager shall consider whether:

(1) The respirable dust control measures would be likely to maintain concentrations of respirable coal mine dust below the standard; and

(2) The operator's compliance with all provisions of the respirable dust control plan could be objectively ascertained by MSHA.

(b) MSHA may take respirable dust samples to determine whether the respirable dust control measures in the operator's plan effectively maintain concentrations of respirable coal mine dust below the standard.

(c) The operator shall comply with all provisions of each respirable dust control plan upon notice from MSHA that the respirable dust control plan is approved.

(d) The operator shall provide a copy of the current respirable dust control plan required under this part to the part 90 miner. The operator shall not post the original or a copy of the plan on the mine bulletin board.

(e) The operator may review respirable dust control plans and submit proposed revisions to such plans to the District Manager for approval.

[89 FR 28485, Apr. 18, 2024]

SUBCHAPTER P CIVIL PENALTIES FOR VIOLATIONS OF THE FEDERAL MINE SAFETY AND HEALTH ACT OF 1977

PART 100 CRITERIA AND PROCEDURES FOR PROPOSED ASSESSMENT OF CIVIL PENALTIES

Authority: 5 U.S.C. 301; 30 U.S.C. 815, 820, 957; 28 U.S.C. 2461 note (Federal Civil Penalties Inflation Adjustment Act of 1990); Pub. L. 114-74 at sec. 701.

Source: 72 FR 13635, Mar. 22, 2007, unless otherwise noted.

§ 100.1 Scope and purpose.

This part provides the criteria and procedures for proposing civil penalties under sections 105 and 110 of the Federal Mine Safety and Health Act of 1977 (Mine Act). The purpose of this part is to provide a fair and equitable procedure for the application of the statutory criteria in determining proposed penalties for violations, to maximize the incentives for mine operators to prevent and correct hazardous conditions, and to assure the prompt and efficient processing and collection of penalties.

§ 100.2 Applicability.

The criteria and procedures in this part are applicable to all proposed assessments of civil penalties for violations of the Mine Act and the standards and regulations promulgated pursuant to the Mine Act, as amended. MSHA shall review each citation and order and shall make proposed assessments of civil penalties.

§ 100.3 Determination of penalty amount; regular assessment.

(a) General. (1) Except as provided in § 100.5(e), the operator of any mine in which a violation occurs of a mandatory health or safety standard or who violates any other provision of the Mine Act, as amended, shall be assessed a civil penalty of not more than $90,649. Each occurrence of a violation of a mandatory safety or health standard may constitute a separate offense. The amount of the proposed civil penalty shall be based on the criteria set forth in sections 105(b) and 110(i) of the Mine Act. These criteria are:

(i) The appropriateness of the penalty to the size of the business of the operator charged;

(ii) The operator's history of previous violations;

(iii) Whether the operator was negligent;

(iv) The gravity of the violation;

(v) The demonstrated good faith of the operator charged in attempting to achieve rapid compliance after notification of a violation; and

(vi) The effect of the penalty on the operator's ability to continue in business.

(2) A regular assessment is determined by first assigning the appropriate number of penalty points to the violation by using the appropriate criteria and tables set forth in this section. The total number of penalty points will then be converted into a dollar amount under the penalty conversion table in paragraph (g) of this section. The penalty amount will be adjusted for demonstrated good faith in accordance with paragraph (f) of this section.

(b) The appropriateness of the penalty to the size of the business of the operator charged. The appropriateness of the penalty to the size of the mine operator's business is calculated by using both the size of the mine cited and the size of the mine's controlling entity. The size of coal mines and their controlling entities is measured by coal production. The size of metal and nonmetal mines and their controlling entities is measured by hours worked. The size of independent contractors is measured by the total hours worked at all mines. Penalty points for size are assigned based on Tables I to V. As used in these tables, the terms “annual tonnage” and “annual hours worked” mean coal produced and hours worked in the previous calendar year. In cases where a full year of data is not available, the coal produced or hours worked is prorated to an annual basis. This criterion accounts for a maximum of 25 penalty points.

(c) History of previous violations. An operator's history of previous violations is based on both the total number of violations and the number of repeat violations of the same citable provision of a standard in a preceding 15-month period. Only assessed violations that have been paid or finally adjudicated, or have become final orders of the Commission will be included in determining an operator's history. The repeat aspect of the history criterion in paragraph (c)(2) of this section applies only after an operator has received 10 violations or an independent contractor operator has received 6 violations.

(1) Total number of violations. For mine operators, penalty points are assigned on the basis of the number of violations per inspection day (VPID)(Table VI). Penalty points are not assigned for mines with fewer than 10 violations in the specified history period. For independent contractors, penalty points are assigned on the basis of the total number of violations at all mines (Table VII). This aspect of the history criterion accounts for a maximum of 25 penalty points.

(2) Repeat violations of the same standard. Repeat violation history is based on the number of violations of the same citable provision of a standard in a preceding 15-month period. For coal and metal and nonmetal mine operators with a minimum of six repeat violations, penalty points are assigned on the basis of the number of repeat violations per inspection day (RPID) (Table VIII). For independent contractors, penalty points are assigned on the basis of the number of violations at all mines (Table IX). This aspect of the history criterion accounts for a maximum of 20 penalty points (Table VIII).

(d) Negligence. Negligence is conduct, either by commission or omission, which falls below a standard of care established under the Mine Act to protect miners against the risks of harm. Under the Mine Act, an operator is held to a high standard of care. A mine operator is required to be on the alert for conditions and practices in the mine that affect the safety or health of miners and to take steps necessary to correct or prevent hazardous conditions or practices. The failure to exercise a high standard of care constitutes negligence. The negligence criterion assigns penalty points based on the degree to which the operator failed to exercise a high standard of care. When applying this criterion, MSHA considers mitigating circumstances which may include, but are not limited to, actions taken by the operator to prevent or correct hazardous conditions or practices. This criterion accounts for a maximum of 50 penalty points, based on conduct evaluated according to Table X.

(e) Gravity. Gravity is an evaluation of the seriousness of the violation. This criterion accounts for a maximum of 88 penalty points, as derived from the Tables XI through XIII. Gravity is determined by the likelihood of the occurrence of the event against which a standard is directed; the severity of the illness or injury if the event has occurred or was to occur; and the number of persons potentially affected if the event has occurred or were to occur.

(f) Demonstrated good faith of the operator in abating the violation. This criterion provides a 10% reduction in the penalty amount of a regular assessment where the operator abates the violation within the time set by the inspector.

(g) Penalty conversion table. The penalty conversion table is used to convert the total penalty points to a dollar amount.

Table 14 to Paragraph (g)—Penalty Conversion Table

Points | Penalty ($)

60 or fewer | $168

61 | 184

62 | 197

63 | 215

64 | 233

65 | 252

66 | 273

67 | 297

68 | 320

69 | 348

70 | 374

71 | 407

72 | 443

73 | 480

74 | 517

75 | 561

76 | 610

77 | 658

78 | 714

79 | 775

80 | 839

81 | 909

82 | 982

83 | 1,066

84 | 1,153

85 | 1,252

86 | 1,355

87 | 1,467

88 | 1,590

89 | 1,723

90 | 1,866

91 | 2,021

92 | 2,187

93 | 2,371

94 | 2,569

95 | 2,782

96 | 3,014

97 | 3,263

98 | 3,538

99 | 3,832

100 | 4,152

101 | 4,497

102 | 4,871

103 | 5,277

104 | 5,716

105 | 6,194

106 | 6,708

107 | 7,267

108 | 7,872

109 | 8,529

110 | 9,239

111 | 10,005

112 | 10,842

113 | 11,744

114 | 12,723

115 | 13,782

116 | 14,929

117 | 16,175

118 | 17,521

119 | 18,981

120 | 20,560

121 | 22,275

122 | 24,126

123 | 26,139

124 | 28,316

125 | 30,670

126 | 33,227

127 | 35,995

128 | 38,992

129 | 42,241

130 | 45,760

131 | 49,571

132 | 53,698

133 | 58,171

134 | 62,812

135 | 67,449

136 | 72,092

137 | 76,728

138 | 81,369

139 | 86,008

140 or more | 90,649

(h) The effect of the penalty on the operator's ability to continue in business. MSHA presumes that the operator's ability to continue in business will not be affected by the assessment of a civil penalty. The operator may, however, submit information to the District Manager concerning the financial status of the business. If the information provided by the operator indicates that the penalty will adversely affect the operator's ability to continue in business, the penalty may be reduced.

[72 FR 13635, Mar. 22, 2007, as amended at 73 FR 7209, Feb. 7, 2008; 81 FR 43455, July 1, 2016; 82 FR 5383, Jan. 18, 2017; 83 FR 14, Jan. 2, 2018; 84 FR 219, Jan. 23, 2019; 85 FR 2299, Jan. 15, 2020; 86 FR 2970, Jan. 14, 2021; 87 FR 2336, Jan. 14, 2022; 88 FR 2218, Jan. 13, 2023; 89 FR 1817, Jan. 11, 2024; 90 FR 1862, Jan. 10, 2025]

§ 100.4 Unwarrantable failure and immediate notification.

(a) The minimum penalty for any citation or order issued under section 104(d)(1) of the Mine Act shall be $3,022.

(b) The minimum penalty for any order issued under section 104(d)(2) of the Mine Act shall be $6,041.

(c) The penalty for failure to provide timely notification to the Secretary under section 103(j) of the Mine Act will be not less than $7,555 and not more than $90,649 for the following accidents:

(1) The death of an individual at the mine, or

(2) An injury or entrapment of an individual at the mine, which has a reasonable potential to cause death.

[72 FR 13635, Mar. 22, 2007, as amended at 74 FR 68919, Dec. 29, 2009; 77 FR 76408, Dec. 28, 2012; 81 FR 43455, July 1, 2016; 82 FR 5383, Jan. 18, 2017; 83 FR 14, Jan. 2, 2018; 84 FR 220, Jan. 23, 2019; 85 FR 2299, Jan. 15, 2020; 86 FR 2970, Jan. 14, 2021; 87 FR 2336, Jan. 14, 2022; 88 FR 2218, Jan. 13, 2023; 89 FR 1818, Jan. 11, 2024; 90 FR 1862, Jan. 10, 2025]

§ 100.5 Determination of penalty amount; special assessment.

(a) MSHA may elect to waive the regular assessment under § 100.3 if it determines that conditions warrant a special assessment.

(b) When MSHA determines that a special assessment is appropriate, the proposed penalty will be based on the six criteria set forth in § 100.3(a). All findings shall be in narrative form.

(c) Any operator who fails to correct a violation for which a citation has been issued under Section 104(a) of the Mine Act within the period permitted for its correction may be assessed a civil penalty of not more than $9,820 for each day during which such failure or violation continues.

(d) Any miner who willfully violates the mandatory safety standards relating to smoking or the carrying of smoking materials, matches, or lighters shall be subject to a civil penalty of not more than $414 for each occurrence of such violation.

(e) Violations that are deemed to be flagrant under section 110(b)(2) of the Mine Act may be assessed a civil penalty of not more than $332,376. For purposes of this section, a flagrant violation means “a reckless or repeated failure to make reasonable efforts to eliminate a known violation of a mandatory health or safety standard that substantially and proximately caused, or reasonably could have been expected to cause, death or serious bodily injury.”

[72 FR 13635, Mar. 22, 2007, as amended at 73 FR 7210, Feb. 7, 2008; 74 FR 68919, Dec. 29, 2009; 77 FR 76408, Dec. 28, 2012; 81 FR 43456, July 1, 2016; 82 FR 5383, Jan. 18, 2017; 83 FR 14, Jan. 2, 2018; 84 FR 220, Jan. 23, 2019; 85 FR 2299, Jan. 15, 2020; 86 FR 2970, Jan. 14, 2021; 87 FR 2336, Jan. 14, 2022; 88 FR 2218, Jan. 13, 2023; 89 FR 1818, Jan. 11, 2024; 90 FR 1862, Jan. 10, 2025]

§ 100.6 Procedures for review of citations and orders; procedures for assessment of civil penalties and conferences.

(a) All parties shall be afforded the opportunity to review with MSHA each citation and order issued during an inspection. It is within the sole discretion of MSHA to grant a request for a conference and to determine the nature of the conference.

(b) Upon notice by MSHA, all parties will have 10 days within which to submit additional information or request a safety and health conference with the District Manager or designee. A conference request may include a request to be notified of, and to participate in, a conference initiated by another party. A conference request must be in writing and must include a brief statement of the reason why each citation or order should be conferenced.

(c) When a conference is conducted, the parties may submit any additional relevant information relating to the violation, either prior to or at the conference. To expedite the conference, the official assigned to the case may contact the parties to discuss the issues involved prior to the conference.

(d) MSHA will consider all relevant information submitted in a timely manner by the parties with respect to the violation. When the facts warrant a finding that no violation occurred, the citation or order will be vacated. Upon conclusion of the conference, or expiration of the conference request period, all citations that are abated and all orders will be promptly referred to MSHA's Office of Assessments. The Office of Assessments will use the citations, orders, and inspector's evaluation as the basis for determining the appropriate amount of a proposed penalty.

§ 100.7 Notice of proposed penalty; notice of contest.

(a) A notice of proposed penalty will be issued and served by certified mail, or the equivalent, upon the party to be charged and by regular mail to the representative of miners at the mine after the time permitted to request a conference under § 100.6 expires, or upon the completion of a conference, or upon review by MSHA of additional information submitted in a timely manner.

(b) Upon receipt of the notice of proposed penalty, the party charged shall have 30 days to either:

(1) Pay the proposed assessment. Acceptance by MSHA of payment tendered by the party charged will close the case.

(2) Notify MSHA in writing of the intention to contest the proposed penalty. When MSHA receives the notice of contest, it advises the Federal Mine Safety and Health Review Commission (Commission) of such notice. No proposed penalty which has been contested before the Commission shall be compromised, mitigated or settled except with the approval of the Commission.

(c) If the proposed penalty is not paid or contested within 30 days of receipt, the proposed penalty becomes a final order of the Commission and is not subject to review by any court or agency.

§ 100.8 Service.

(a) All operators are required by part 41 (Notification of Legal Identity) of this chapter to file with MSHA the name and address of record of the operator. All representatives of miners are required by part 40 (Representative of Miners) of this chapter to file with MSHA the mailing address of the person or organization acting in a representative capacity. Proposed penalty assessments delivered to those addresses shall constitute service.

(b) If any of the parties choose to have proposed penalty assessments mailed to a different address, the Office of Assessments must be notified in writing of the new address. Delivery to this address shall also constitute service.

(c) Service for operators who fail to file under part 41 of this chapter will be upon the last known business address recorded with MSHA.

101-103 PARTS 101-103 [RESERVED]

SUBCHAPTER Q PATTERN OF VIOLATIONS

PART 104 PATTERN OF VIOLATIONS

Authority: 30 U.S.C. 814(e), 957.

Source: 78 FR 5073, Jan. 23, 2013, unless otherwise noted.

§ 104.1 Purpose and scope.

This part establishes the criteria and procedures for determining whether a mine operator has established a pattern of significant and substantial (S&S) violations at a mine. It implements section 104(e) of the Federal Mine Safety and Health Act of 1977 (Mine Act) by addressing mines with an inspection history of recurrent S&S violations of mandatory safety or health standards that demonstrate a mine operator's disregard for the health and safety of miners. The purpose of the procedures in this part is the restoration of effective safe and healthful conditions at such mines.

§ 104.2 Pattern criteria.

(a) At least once each year, MSHA will review the compliance and accident, injury, and illness records of mines to determine if any mines meet the pattern of violations criteria. MSHA's review to identify mines with a pattern of S&S violations will include:

(1) Citations for S&S violations;

(2) Orders under section 104(b) of the Mine Act for not abating S&S violations;

(3) Citations and withdrawal orders under section 104(d) of the Mine Act, resulting from the mine operator's unwarrantable failure to comply;

(4) Imminent danger orders under section 107(a) of the Mine Act;

(5) Orders under section 104(g) of the Mine Act requiring withdrawal of miners who have not received training and who MSHA declares to be a hazard to themselves and others;

(6) Enforcement measures, other than section 104(e) of the Mine Act, that have been applied at the mine;

(7) Other information that demonstrates a serious safety or health management problem at the mine, such as accident, injury, and illness records; and

(8) Mitigating circumstances.

(b) MSHA will post the specific pattern criteria on its Web site.

§ 104.3 Issuance of notice.

(a) When a mine has a pattern of violations, the District Manager will issue a pattern of violations notice to the mine operator that specifies the basis for the Agency's action. The District Manager will also provide a copy of this notice to the representative of miners.

(b) The mine operator shall post the pattern of violations notice issued under this part on the mine bulletin board. The pattern of violations notice shall remain posted at the mine until MSHA terminates it under § 104.4 of this part.

(c) If MSHA finds any S&S violation within 90 days after issuance of the pattern notice, MSHA will issue an order for the withdrawal of all persons from the affected area, except those persons referred to in section 104(c) of the Mine Act, until the violation has been abated.

(d) If a withdrawal order is issued under paragraph (c) of this section, any subsequent S&S violation will result in a withdrawal order that will remain in effect until MSHA determines that the violation has been abated.

§ 104.4 Termination of notice.

(a) Termination of a section 104(e)(1) pattern of violations notice shall occur when an MSHA inspection of the entire mine finds no S&S violations or if MSHA does not issue a withdrawal order in accordance with section 104(e)(1) of the Mine Act within 90 days after the issuance of the pattern of violations notice.

(b) The mine operator may request an inspection of the entire mine or portion of the mine. MSHA will not provide advance notice of the inspection and will determine the scope of the inspection. Inspections of portions of the mine, within 90 days, that together cover the entire mine shall constitute an inspection of the entire mine for the purposes of this part.

105-199 PARTS 105-199 [RESERVED]

CHAPTER II BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR

SUBCHAPTER A MINERALS REVENUE MANAGEMENT

200-202 PARTS 200-202 [RESERVED]

PART 203 RELIEF OR REDUCTION IN ROYALTY RATES

Authority: 25 U.S.C. 396 et seq.; 25 U.S.C. 396a et seq.; 25 U.S.C. 2101 et seq.; 30 U.S.C. 181 et seq.; 30 U.S.C. 351 et seq.; 30 U.S.C. 1001 et seq.; 30 U.S.C. 1701 et seq.; 31 U.S.C. 9701; 42 U.S.C. 15903-15906; 43 U.S.C. 1301 et seq.; 43 U.S.C. 1331 et seq.; and 43 U.S.C. 1801 et seq.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Subpart A General Provisions
§ 203.0 What definitions apply to this part?

Authorized field means a field:

(1) Located in a water depth of at least 200 meters and in the Gulf of America-(GOA) west of 87 degrees, 30 minutes West longitude;

(2) That includes one or more pre-Act leases; and

(3) From which no current pre-Act lease produced, other than test production, before November 28, 1995.

Certified unsuccessful well means an original well or a sidetrack with a sidetrack measured depth (i.e., length) of at least 10,000 feet, on your lease that:

(1) You begin drilling on or after March 26, 2003, and before May 3, 2009, on a lease that is located in water partly or entirely less than 200 meters deep and that is not a non-converted lease, or on or after May 18, 2007, and before May 3, 2013, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep;

(2) You begin drilling before your lease produces gas or oil from a well with a perforated interval the top of which is at least 18,000 feet true vertical depth subsea (TVD SS), (i.e., below the datum at mean sea level);

(3) You drill to at least 18,000 feet TVD SS with a target reservoir on your lease, identified from seismic and related data, deeper than that depth;

(4) Fails to meet the producibility requirements of 30 CFR part 550, subpart A, and does not produce gas or oil, or meets those producibility requirements and Bureau of Ocean Energy Management (BOEM) agrees it is not commercially producible; and

(5) For which you have provided the notices and information required under § 203.47.

Complete application means an original and two copies of the six reports consisting of the data specified in §§ 203.81, 203.83, and 203.85 through 203.89, along with one set of digital information, which Bureau of Safety and Environmental Enforcement (BSEE) has reviewed and found complete.

Deep well means either an original well or a sidetrack with a perforated interval the top of which is at least 15,000 feet TVD SS and less than 20,000 feet TVD SS. A deep well subsequently re-perforated at less than 15,000 feet TVD SS in the same reservoir is still a deep well.

Determination means the binding decision by BSEE on whether your field qualifies for relief or how large a royalty-suspension volume must be to make the field economically viable.

Development project means a project to develop one or more oil or gas reservoirs located on one or more contiguous leases that have had no production (other than test production) before the current application for royalty relief and are either:

(1) Located in a planning area offshore Alaska; or

(2) Located in the GOA in a water depth of at least 200 meters and wholly west of 87 degrees, 30 minutes West longitude, and were issued in a sale held after November 28, 2000.

Draft application means the preliminary set of information and assumptions you submit to seek a nonbinding assessment on whether a field could be expected to qualify for royalty relief.

Eligible lease means a lease that:

(1) Is issued as part of an OCS lease sale held after November 28, 1995, and before November 28, 2000;

(2) Is located in the Gulf of America in water depths of 200 meters or deeper;

(3) Lies wholly west of 87 degrees, 30 minutes West longitude; and

(4) Is offered subject to a royalty suspension volume.

Expansion project means a project that meets the following requirements:

(1) You must propose the project in a (BOEM) Development and Production Plan, a BOEM Development Operations Coordination Document (DOCD), or a BOEM Supplement to a DOCD, approved by the Secretary of the Interior after November 28, 1995.

(2) The project must be located on either:

(i) A pre-Act lease in the GOA, or a lease in the GOA issued in a sale held after November 28, 2000, located wholly west of 87 degrees, 30 minutes West longitude; or

(ii) A lease in a planning area offshore Alaska.

(3) On a pre-Act lease in the GOA, the project:

(i) Must significantly increase the ultimate recovery of resources from one or more reservoirs that have not previously produced (extending recovery from reservoirs already in production does not constitute a significant increase); and

(ii) Must involve a substantial capital investment (e.g., fixed-leg platform, subsea template and manifold, tension-leg platform, multiple well project, etc.).

(4) For a lease issued in a planning area offshore Alaska, or in the GOA after November 28, 2000, the project must involve a new well drilled into a reservoir that has not previously produced.

(5) On a lease in the GOA, the project must not include a reservoir the production from which an RSV under §§ 203.30 through 203.36 or §§ 203.40 through 203.48 would be applied.

Fabrication (or start of construction) means evidence of an irreversible commitment to a concept and scale of development. Evidence includes copies of a binding contract between you (as applicant) and a fabrication yard, a letter from a fabricator certifying that continuous construction has begun, and a receipt for the customary down payment.

Field means an area consisting of a single reservoir or multiple reservoirs all grouped on, or related to, the same general geological structural feature or stratigraphic trapping condition. Two or more reservoirs may be in a field, separated vertically by intervening impervious strata or laterally by local geologic barriers, or both.

Lease means a lease or unit.

New production means any production from a current pre-Act lease from which no royalties are due on production, other than test production, before November 28, 1995. Also, it means any additional production resulting from new lease-development activities on a lease issued in a sale after November 28, 2000, or a current pre-Act lease under a BOEM DOCD or a BOEM Supplement approved by the Secretary of the Interior after November 28, 1995.

Nonbinding assessment means an opinion by BSEE of whether your field could qualify for royalty relief. It is based on your draft application and does not entitle the field to relief.

Non-converted lease means a lease located partly or entirely in water less than 200 meters deep issued in a lease sale held after January 1, 2001, and before January 1, 2004, whose original lease terms provided for an RSV for deep gas production and the lessee has not exercised the option under § 203.49 to replace the lease terms for royalty relief with those in § 203.0 and §§ 203.40 through 203.48.

Original well means a well that is drilled without utilizing an existing wellbore. An original well includes all sidetracks drilled from the original wellbore either before the drilling rig moves off the well location or after a temporary rig move that BSEE agrees was forced by a weather or safety threat and drilling resumes within 1 year. A bypass from an original well (e.g., drilling around material blocking the hole or to straighten crooked holes) is part of the original well.

Participating area means that part of the unit area that BSEE determines is reasonably proven by drilling and completion of producible wells, geological and geophysical information, and engineering data to be capable of producing hydrocarbons in paying quantities.

Performance conditions mean minimum conditions you must meet, after we have granted relief and before production begins, to remain qualified for that relief. If you do not meet each one of these performance conditions, we consider it a change in material fact significant enough to invalidate our original evaluation and approval.

Phase 1 ultra-deep well means an ultra-deep well on a lease that is located in water partly or entirely less than 200 meters deep for which drilling began before May 18, 2007, and that begins production before May 3, 2009, or that meets the requirements to be a certified unsuccessful well.

Phase 2 ultra-deep well means an ultra-deep well for which drilling began on or after May 18, 2007; and that either meets the requirements to be a certified unsuccessful well or that begins production:

(1) Before the date which is 5 years after the lease issuance date on a non-converted lease; or

(2) Before May 3, 2009, on all other leases located in water partly or entirely less than 200 meters deep; or

(3) Before May 3, 2013, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep.

Phase 3 ultra-deep well means an ultra-deep well for which drilling began on or after May 18, 2007, and that begins production:

(1) On or after the date which is 5 years after the lease issuance date on a non-converted lease; or

(2) On or after May 3, 2009, on all other leases located in water partly or entirely less than 200 meters deep; or

(3) On or after May 3, 2013, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep.

Pre-Act lease means a lease that:

(1) Results from a sale held before November 28, 1995;

(2) Is located in the GOA in water depths of 200 meters or deeper; and

(3) Lies wholly west of 87 degrees, 30 minutes West longitude.

Production means all oil, gas, and other relevant products you save, remove, or sell from a tract or those quantities allocated to your tract under a unitization formula, as measured for the purposes of determining the amount of royalty payable to the United States.

Project means any activity that requires at least a permit to drill.

Qualified deep well means:

(1) On a lease that is located in water partly or entirely less than 200 meters deep that is not a non-converted lease, a deep well for which drilling began on or after March 26, 2003, that produces natural gas (other than test production), including gas associated with oil production, before May 3, 2009, and for which you have met the requirements prescribed in § 203.44;

(2) On a non-converted lease, a deep well that produces natural gas (other than test production) before the date which is 5 years after the lease issuance date from a reservoir that has not produced from a deep well on any lease; or

(3) On a lease that is located in water entirely more than 200 meters but entirely less than 400 meters deep, a deep well for which drilling began on or after May 18, 2007, that produces natural gas (other than test production), including gas associated with oil production before May 3, 2013, and for which you have met the requirements prescribed in § 203.44.

Qualified ultra-deep well means:

(1) On a lease that is located in water partly or entirely less than 200 meters deep that is not a non-converted lease, an ultra-deep well for which drilling began on or after March 26, 2003, that produces natural gas (other than test production), including gas associated with oil production, and for which you have met the requirements prescribed in § 203.35 or § 203.44, as applicable; or

(2) On a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep, or on a non-converted lease, an ultra-deep well for which drilling began on or after May 18, 2007, that produces natural gas (other than test production), including gas associated with oil production, and for which you have met the requirements prescribed in § 203.35.

Qualified well means either a qualified deep well or a qualified ultra-deep well.

Redetermination means our reconsideration of our determination on royalty relief because you request it after:

(1) We have rejected your application;

(2) We have granted relief but you want a larger suspension volume;

(3) We withdraw approval; or

(4) You renounce royalty relief.

Renounce means action you take to give up relief after we have granted it and before you start production.

Reservoir means an underground accumulation of oil or natural gas, or both, characterized by a single pressure system and segregated from other such accumulations.

Royalty suspension (RS) lease means a lease that:

(1) Is issued as part of an OCS lease sale held after November 28, 2000;

(2) Is in locations or planning areas specified in a particular Notice of OCS Lease Sale offering that lease; and

(3) Is offered subject to a royalty suspension specified in a Notice of OCS Lease Sale published in the Federal Register.

Royalty suspension supplement (RSS) means a royalty suspension volume resulting from drilling a certified unsuccessful well that is applied to future natural gas and oil production generated at any drilling depth on, or allocated under a BSEE-approved unit agreement to, the same lease.

Royalty suspension volume (RSV) means a volume of production from a lease that is not subject to royalty under the provisions of this part.

Sidetrack means, for the purpose of this subpart, a well resulting from drilling an additional hole to a new objective bottom-hole location by leaving a previously drilled hole. A sidetrack also includes drilling a well from a platform slot reclaimed from a previously drilled well or re-entering and deepening a previously drilled well. A bypass from a sidetrack (e.g., drilling around material blocking the hole, or to straighten crooked holes) is part of the sidetrack.

Sidetrack measured depth means the actual distance or length in feet a sidetrack is drilled beginning where it exits a previously drilled hole to the bottom hole of the sidetrack, that is, to its total depth.

Sunk costs for an authorized field means the after-tax eligible costs that you (not third parties) incur for exploration, development, and production from the spud date of the first discovery on the field to the date we receive your complete application for royalty relief. The discovery well must be qualified as producible under 30 CFR part 550, subpart A. Sunk costs include the rig mobilization and material costs for the discovery well that you incurred before its spud date.

Sunk costs for an expansion or development project means the after-tax eligible costs that you (not third parties) incur for only the first well that encounters hydrocarbons in the reservoir(s) included in the application and that meets the producibility requirements under 30 CFR part 550, subpart A on each lease participating in the application. Sunk costs include rig mobilization and material costs for the discovery wells that you incurred before their spud dates.

Ultra-deep well means either an original well or a sidetrack completed with a perforated interval the top of which is at least 20,000 feet TVD SS. An ultra-deep well subsequently re-perforated less than 20,000 feet TVD SS in the same reservoir is still an ultra-deep well.

Withdraw means action we take on a field that has qualified for relief if you have not met one or more of the performance conditions.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44323, Sept. 15, 2025]

§ 203.1 What is BSEE's authority to grant royalty relief?

The Outer Continental Shelf (OCS) Lands Act, 43 U.S.C. 1337, as amended by the OCS Deep Water Royalty Relief Act (DWRRA), Public Law 104-58 and the Energy Policy Act of 2005, Public Law 109-058 authorizes us to grant royalty relief in four situations.

(a) Under 43 U.S.C. 1337(a)(3)(A), we may reduce or eliminate any royalty or a net profit share specified for an OCS lease to promote increased production.

(b) Under 43 U.S.C. 1337(a)(3)(B), we may reduce, modify, or eliminate any royalty or net profit share to promote development, increase production, or encourage production of marginal resources on certain leases or categories of leases. This authority is restricted to leases in the GOA that are west of 87 degrees, 30 minutes West longitude, and in the planning areas offshore Alaska.

(c) Under 43 U.S.C. 1337(a)(3)(C), we may suspend royalties for designated volumes of new production from any lease if:

(1) Your lease is in deep water (water at least 200 meters deep);

(2) Your lease is in designated areas of the GOA (west of 87 degrees, 30 minutes West longitude);

(3) Your lease was acquired in a lease sale held before the DWRRA (before November 28, 1995);

(4) We find that your new production would not be economic without royalty relief; and

(5) Your lease is on a field that did not produce before enactment of the DWRRA, or if you propose a project to significantly expand production under a Development Operations Coordination Document (DOCD) or a supplementary DOCD, that the Bureau of Ocean Energy Management (BOEM) approved after November 28, 1995.

(d) Under 42 U.S.C. 15904-15905, we may suspend royalties for designated volumes of gas production from deep and ultra-deep wells on a lease if:

(1) Your lease is in shallow water (water less than 400 meters deep) and you produce from an ultra-deep well (top of the perforated interval is at least 20,000 feet TVD SS) or your lease is in waters entirely more than 200 meters and entirely less than 400 meters deep and you produce from a deep well (top of the perforated interval is at least 15,000 feet TVD SS);

(2) Your lease is in the designated area of the GOA (wholly west of 87 degrees, 30 minutes west longitude); and

(3) Your lease is not eligible for deep water royalty relief.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44324, Sept. 15, 2025]

§ 203.2 How can I obtain royalty relief?

We may reduce or suspend royalties for Outer Continental Shelf (OCS) leases or projects that meet the criteria in the following table.

If you have a lease . . . | And if you . . . | Then we may grant you . . .

(a) With earnings that cannot sustain production (i.e., End-of-life lease), | Would abandon otherwise potentially recoverable resources but seek to increase production by operating beyond the point at which the lease is economic under the existing royalty rate, | A reduced royalty rate on current monthly production and a higher royalty rate on additional monthly production (see §§ 203.50 through 203.56).

(b) Located in a designated GOA deep water area (i.e., 200 meters or greater) and acquired in a lease sale held before November 28, 1995, or after November 28, 2000, | Propose an expansion project and can demonstrate your project is uneconomic without royalty relief, | A royalty suspension for a minimum production volume plus any additional production large enough to make the project economic (see §§ 203.60 through 203.79).

(c) Located in a designated GOA deep water area and acquired in a lease sale held before November 28, 1995 (Pre-Act lease), | Are on a field from which no current pre-Act lease produced (other than test production) before November 28, 1995, (Authorized field,) | A royalty suspension for a minimum production volume plus any additional volume needed to make the field economic (see §§ 203.60 through 203.79).

(d) Located in a designated GOA deep water area and acquired in a lease sale held after November 28, 2000, | Propose a development project and can demonstrate that the suspension volume, if any, for your lease is not enough to make development economic, | A royalty suspension for a minimum production volume plus any additional volume needed to make your project economic (see §§ 203.60 through 203.79).

(e) Where royalty relief would recover significant additional resources or, offshore Alaska or in certain areas of the GOA, would enable development, | Are not eligible to apply for end-of-life or deep water royalty relief, but show us you meet certain eligibility conditions, | A royalty modification in size, duration, or form that makes your lease or project economic (see § 203.80).

(f) Located in a designated GOA shallow water area and acquired in a lease sale held before January 1, 2001, or after January 1, 2004, or have exercised an option to substitute for royalty relief in your lease terms, | Drill a deep well on a lease that is not eligible for deep water royalty relief and you have not previously produced oil or gas from a deep well or an ultra-deep well, | A royalty suspension for a volume of gas produced from successful deep and ultra-deep wells, or, for certain unsuccessful deep and ultra-deep wells, a smaller royalty suspension for a volume of gas or oil produced by all wells on your lease (see §§ 203.40 through 203.49).

(g) Located in a designated GOA shallow water area, | Drill and produce gas from an ultra-deep well on a lease that is not eligible for deep water royalty relief and you have not previously produced oil or gas from an ultra-deep well, | A royalty suspension for a volume of gas produced from successful ultra-deep and deep wells on your lease (see §§ 203.30 through 203.36).

(h) Located in planning areas offshore Alaska, | Propose an expansion project or propose a development project and can demonstrate that the project is uneconomic without relief or that the suspension volume, if any, for your lease is not enough to make development economic, | A royalty suspension for a minimum production volume plus any additional volume needed to make your project economic (see §§ 203.60, 203.62, 203.67 through 203.70, 203.73, and 203.76 through 203.79).

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44324, Sept. 15, 2025]

§ 203.3 Do I have to pay a fee to request royalty relief?

When you submit an application or ask for a preview assessment, you must include a fee to reimburse us for our costs of processing your application or assessment. Federal policy and law require us to recover the cost of services that confer special benefits to identifiable non-Federal recipients. The Independent Offices Appropriation Act (31 U.S.C. 9701), Office of Management and Budget Circular A-25, and the Omnibus Appropriations Bill (Pub. L. 104-134, 110 Stat. 1321, April 26, 1996) authorize us to collect these fees.

(a) We will specify the necessary fees for each of the types of royalty relief applications and possible BSEE audits in a Notice to Lessees. We will periodically update the fees to reflect changes in costs, as well as provide other information necessary to administer royalty relief.

(b) You must file all payments electronically through the Fees for Services page on the BSEE Web site at http://www.bsee.gov, and you must include a copy of the Pay.gov confirmation receipt page with your application or assessment.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36148, June 6, 2016]

§ 203.4 How do the provisions in this part apply to different types of leases and projects?

The tables in this section summarize the similar application and approval provisions for the discretionary end-of-life and deep water royalty relief programs in §§ 203.50 to 203.91. Because royalty relief for deep gas on leases not subject to deep water royalty relief, as provided for under §§ 203.40 to 203.48, does not involve an application, its provisions do not parallel the other two royalty relief programs and are not summarized in this section.

(a) We require the information elements indicated by an X in the following table and described in §§ 203.51, 203.62, and 203.81 through 203.89 for applications for royalty relief.

Information elements | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) Administrative information report | X | X | X | X

(2) Net revenue and relief justification report (prescribed format) | X

(3) Economic viability and relief justification report (Royalty Suspension Viability Program (RSVP) model inputs justified with Geological and Geophysical (G&G), Engineering, Production, & Cost reports) | X | X | X

(4) G&G report | X | X | X

(5) Engineering report | X | X | X

(6) Production report | X | X | X

(7) Deep water cost report | X | X | X

(b) We require the confirmation elements indicated by an X in the following table and described in §§ 203.70, 203.81, 203.90 and 203.91 to retain royalty relief.

Confirmation elements | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) Fabricator's confirmation report | X | X | X

(2) Post-production development report approved by an independent certified public accountant (CPA) * * * | X | X | X

(c) The following table indicates by an X, and §§ 203.50, 203.52, 203.60 and 203.67 describe, the prerequisites for our approval of your royalty relief application.

Approval conditions | End-of-life lease | Deep water

Expansion | Pre-act lease | Development project

(1) At least 12 of the last 15 months have the required level of production | X

(2) Already producing | X

(3) A producible well into a reservoir that has not produced before | X | X | X

(4) Royalties for qualifying months exceed 75 percent of net revenue (NR) | X

(5) Substantial investment on a pre-Act lease (e.g., platform, subsea template)

(6) Determined to be economic only with relief | X | X | X

(d) The following table indicates by an X, and §§ 203.52, 203.74, and 203.75 describe, the prerequisites for a redetermination of our royalty relief decision.

Redetermination conditions | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) After 12 months under current rate, criteria same as for approval | X

(2) For material change in geologic data, prices, costs, or available technology | X | X | X

(e) The following table indicates by an X, and §§ 203.53 and 203.69 describe, the characteristics of approved royalty relief.

Relief rate and volume, subject to certain conditions | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) One-half pre-application effective lease rate on the qualifying amount, 1.5 times pre-application effective lease rate on additional production up to twice the qualifying amount, and the pre-application effective lease rate for any larger volumes | X

(2) Qualifying amount is the average monthly production for 12 qualifying months | X

(3) Zero royalty rate on the suspension volume and the original lease rate on additional production | X | X | X

(4) Suspension volume is at least 17.5, 52.5 or 87.5 million barrels of oil equivalent (MMBOE) | X

(5) Suspension volume is at least the minimum set in the Notice of Sale, the lease, or the regulations | X | X

(6) Amount needed to become economic | X | X | X

(f) The following table indicates by an X, and §§ 203.54 and 203.78 describe, circumstances under which we discontinue your royalty relief.

Full royalty resumes when | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) Average NYMEX price for last 12 months is at least 25 percent above the average for the qualifying months. | X

(2) Average NYMEX price for last calendar year exceeds $28/bbl or $3.50/mcf, escalated by the gross domestic product (GDP) deflator since 1994 | X | X

(3) Average prices for designated periods exceed levels we specify in the Notice of Sale or the lease | X | X

(g) The following table indicates by an X, and §§ 203.55, 203.76, and 203.77 describe, circumstances under which we end or reduce royalty relief.

Relief withdrawn or reduced | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) If recipient requests | X | X | X | X

(2) Lease royalty rate is at the effective rate for 12 consecutive months | X

(3) Conditions occur that we specified in the approval letter in individual cases | X

(4) Recipient does not submit post-production report that compares expected to actual costs | X | X | X

(5) Recipient changes development system | X | X | X

(6) Recipient excessively delays starting fabrication | X | X | X

(7) Recipient spends less than 80 percent of proposed pre-production costs prior to start of production | X | X | X

(8) Amount of relief volume is produced | X | X | X

§ 203.5 What is BSEE's authority to collect information?

(a) The Office of Management and Budget (OMB) has approved the information collection requirements in this part under 44 U.S.C. 3501 et seq., and assigned OMB Control Number 1014-0005. The title of this information collection is “30 CFR part 203, Relief or Reduction in Royalty Rates.”

(b) BSEE collects this information to make decisions on the economic viability of leases requesting a suspension or elimination of royalty or net profit share. Responses are required to obtain a benefit or are mandatory according to 43 U.S.C. 1331 et seq. BSEE will protect information considered proprietary under applicable law and under regulations at § 203.61, “How do I assess my chances for getting relief?” and 30 CFR 250.197, “Data and information to be made available to the public or for limited inspection.”

(c) An agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

(d) Send comments regarding any aspect of the collection of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36148, June 6, 2016]

Subpart B OCS Oil, Gas, and Sulfur General
6 Royalty Relief for Drilling Ultra-Deep Wells on Leases Not Subject to Deep Water Royalty Relief
§ 203.30 Which leases are eligible for royalty relief as a result of drilling a phase 2 or phase 3 ultra-deep well?

Your lease may receive a royalty suspension volume (RSV) under §§ 203.31 through 203.36 if the lease meets all the requirements of this section.

(a) The lease is located in the GOA wholly west of 87 degrees, 30 minutes West longitude in water depths entirely less than 400 meters deep.

(b) The lease has not produced gas or oil from a deep well or an ultra-deep well, except as provided in § 203.31(b).

(c) If the lease is located entirely in more than 200 meters and entirely less than 400 meters of water, it must either:

(1) Have been issued before November 28, 1995, and not been granted deep water royalty relief under 43 U.S.C. 1337(a)(3)(C), added by section 302 of the Deep Water Royalty Relief Act; or

(2) Have been issued after November 28, 2000, and not been granted deep water royalty relief under §§ 203.60 through 203.79.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

§ 203.31 If I have a qualified phase 2 or qualified phase 3 ultra-deep well, what royalty relief would that well earn for my lease?

(a) Subject to the administrative requirements of § 203.35 and the price conditions in § 203.36, your qualified well earns your lease an RSV shown in the following table in billions of cubic feet (BCF) or in thousands of cubic feet (MCF) as prescribed in § 203.33:

If you have a qualified phase 2 or qualified phase 3 ultra-deep well that is: | Then your lease earns an RSV on this volume of gas production:

(1) An original well, | 35 BCF.

(2) A sidetrack with a sidetrack measured depth of at least 20,000 feet, | 35 BCF.

(3) An ultra-deep short sidetrack that is a phase 2 ultra-deep well, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 25 BCF.

(4) An ultra-deep short sidetrack that is a phase 3 ultra-deep well, | 0 BCF.

(b)(1) This paragraph applies if your lease:

(i) Has produced gas or oil from a deep well with a perforated interval the top of which is less than 18,000 feet TVD SS;

(ii) Was issued in a lease sale held between January 1, 2004, and December 31, 2005; and

(iii) The terms of your lease expressly incorporate the provisions of §§ 203.41 through 203.47 as they existed at the time the lease was issued.

(2) Subject to the administrative requirements of § 203.35 and the price conditions in § 203.36, your qualified well earns your lease an RSV shown in the following table in BCF or MCF as prescribed in § 203.33:

If you have a qualified phase 2 ultra-deep well that is . . . | Then your lease earns an RSV on this volume of gas production:

(i) An original well or a sidetrack with a sidetrack measured depth of at least 20,000 feet TVD SS, | 10 BCF.

(ii) An ultra-deep short sidetrack, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 10 BCF.

(c) Lessees may request a refund of or recoup royalties paid on production from qualified phase 2 or phase 3 ultra-deep wells that:

(1) Occurs before December 18, 2008, and

(2) Is subject to application of an RSV under either § 203.31 or § 203.41.

(d) The following examples illustrate how this section applies. These examples assume that your lease is located in the GOA west of 87 degrees, 30 minutes West longitude and in water less than 400 meters deep (see § 203.30(a)), has no existing deep or ultra-deep wells and that the price thresholds prescribed in § 203.36 have not been exceeded.

Example 1:In 2008, you drill and begin producing from an ultra-deep well with a perforated interval the top of which is 25,000 feet TVD SS, and your lease has had no prior production from a deep or ultra-deep well. Assuming your lease has no deepwater royalty relief (see § 203.30(c)), your lease is eligible (according to § 203.30(b)) to earn an RSV under § 203.31 because it has not yet produced from a deep well. Your lease earns an RSV of 35 BCF under this section when this well begins producing. According to § 203.31(a), your 25,000 foot well qualifies your lease for this RSV because the well was drilled after the relief authorized here became effective (when the proposed version of this rule was published on May 18, 2007) and produced from an interval that meets the criteria for an ultra-deep well (i.e., is a phase 2 ultra-deep well as defined in § 203.0). Then in 2014, you drill and produce from another ultra-deep well with a perforated interval the top of which is 29,000 feet TVD SS. Your lease earns no additional RSV under this section when this second ultra-deep well produces, because your lease no longer meets the condition in (§ 203.30(b)) of no production from a deep well. However, any remaining RSV earned by the first ultra-deep well on your lease would be applied to production from both the first and the second ultra-deep wells as prescribed in § 203.33(a)(2), or § 203.33(b)(2) if your lease is part of a unit.

Example 2:In 2005, you spudded and began producing from an ultra-deep well with a perforated interval the top of which is 23,000 feet TVD SS. Your lease earns no RSV under this section from this phase 1 ultra-deep well (as defined in § 203.0) because you spudded the well before the publication date (May 18, 2007) of the proposed rule when royalty relief under § 203.31(a) became effective. However, this ultra-deep well may earn an RSV of 25 BCF for your lease under § 203.41 (that became effective May 3, 2004), if the lease is located in water depths partly or entirely less than 200 meters and has not previously produced from a deep well (§ 203.30(b)).

Example 3:In 2000, you began producing from a deep well with a perforated interval the top of which is 16,000 feet TVD SS and your lease is located in water 100 meters deep. Then in 2008, you drill and produce from a new ultra-deep well with a perforated interval the top of which is 24,000 feet TVD SS. Your lease earns no RSV under either this section or § 203.41 because the 16,000-foot well was drilled before we offered any way to earn an RSV for producing from a deep well (see dates in the definition of qualified well in § 203.0) and because the existence of the 16,000-foot well means the lease is not eligible (see § 203.30(b)) to earn an RSV for the 24,000-foot well. Because the lease existed in the year 2000, it cannot be eligible for the exception to this eligibility condition provided in § 203.31(b).

Example 4:In 2008, you spud and produce from an ultra-deep well with a perforated interval the top of which is 22,000 feet TVD SS, your lease is located in water 300 meters deep, and your lease has had no previous production from a deep or ultra-deep well. Your lease earns an RSV of 35 BCF under this section when this well begins producing because your lease meets the conditions in § 203.30 and the well fits the definition of a phase 2 ultra-deep well (in § 203.0). Then in 2010, you spud and produce from a deep well with a perforated interval the top of which is 16,000 feet TVD SS. Your 16,000-foot well earns no RSV because it is on a lease that already has a producing well at least 18,000 feet subsea (see § 203.42(a)), but any remaining RSV earned by the ultra-deep well would also be applied to production from the deep well as prescribed in § 203.33(a)(2), or § 203.33(b)(2) if your lease is part of a unit and § 203.43(a)(2), or § 203.43(b)(2) if your lease is part of a unit. However, if the 16,000-foot deep well does not begin production until 2016 (or if your lease were located in water less than 200 meters deep), then the 16,000-foot well would not be a qualified deep well because this well does not begin production within the interval specified in the definition of a qualified well in § 203.0, and the RSV earned by the ultra-deep well would not be applied to production from this (unqualified) deep well.

Example 5:In 2008, you spud a deep well with a perforated interval the top of which is 17,000 feet TVD SS that becomes a qualified well and earns an RSV of 15 BCF under § 203.41 when it begins producing. Then in 2011, you spud an ultra-deep well with a perforated interval the top of which is 26,000 feet TVD SS. Your 26,000-foot well becomes a qualified ultra-deep well because it meets the date and depth conditions in this definition under § 203.0 when it begins producing, but your lease earns no additional RSV under this section or § 203.41 because it is on a lease that already has production from a deep well (see § 203.30(b)). Both the qualified deep well and the qualified ultra-deep well would share your lease's total RSV of 15 BCF in the manner prescribed in §§ 203.33 and 203.43.

Example 6:In 2008, you spud a qualified ultra-deep well that is a sidetrack with a sidetrack measured depth of 21,000 feet and a perforated interval the top of which is 25,000 feet TVD SS. This well meets the definition of an ultra-deep well but is too long to be classified an ultra-deep short sidetrack in § 203.0. If your lease is located in 150 meters of water and has not previously produced from a deep well, your lease earns an RSV of 35 BCF because it was drilled after the effective date for earning this RSV. Further, this RSV applies to gas production from this and any future qualified deep and qualified ultra-deep wells on your lease, as prescribed in § 203.33. The absence of an expiration date for earning an RSV on an ultra-deep well means this long sidetrack well becomes a qualified well whenever it starts production. If your sidetrack has a sidetrack measured depth of 14,000 feet and begins production in March 2009, it earns an RSV of 12.4 BCF under this section because it meets the definitions of a phase 2 ultra-deep well (production begins before the expiration date for the pre-existing relief in its water depth category) and an ultra-deep short sidetrack in § 203.0. However, if it does not begin production until 2010, it earns no RSV because it is too short as a phase 3 ultra-deep well to be a qualified ultra-deep well.

Example 7:Your lease was issued in June 2004 and expressly incorporates the provisions of §§ 203.41 through 203.47 as they existed at that time. In January 2005, you spud a deep well (well no. 1) with a perforated interval the top of which is 16,800 feet TVD SS that becomes a qualified well and earns an RSV of 15 BCF under § 203.41 when it begins producing. Then in February 2008, you spud an ultra-deep well (well no. 2) with a perforated interval the top of which is 22,300 feet that begins producing in November 2008, after well no. 1 has started production. Well no. 2 earns your lease an additional RSV of 10 BCF under paragraph (b) of this section because it begins production in time to be classified as a phase 2 ultra-deep well. If, on the other hand, well no. 2 had begun producing in June 2009, it would earn no additional RSV for the lease because it would be classified as a phase 3 ultra-deep well and thus is not entitled to the exception under paragraph (b) of this section.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

§ 203.32 What other requirements or restrictions apply to royalty relief for a qualified phase 2 or phase 3 ultra-deep well?

(a) If a qualified ultra-deep well on your lease is within a unitized portion of your lease, the RSV earned by that well under this section applies only to your lease and not to other leases within the unit or to the unit as a whole.

(b) If your qualified ultra-deep well is a directional well (either an original well or a sidetrack) drilled across a lease line, then either:

(1) The lease with the perforated interval that initially produces earns the RSV or

(2) If the perforated interval crosses a lease line, the lease where the surface of the well is located earns the RSV.

(c) Any RSV earned under § 203.31 is in addition to any royalty suspension supplement (RSS) for your lease under § 203.45 that results from a different wellbore.

(d) If your lease earns an RSV under § 203.31 and later produces from a deep well that is not a qualified well, the RSV is not forfeited or terminated, but you may not apply the RSV earned under § 203.31 to production from the non-qualified well.

(e) You owe minimum royalties or rentals in accordance with your lease terms notwithstanding any RSVs allowed under paragraphs (a) and (b) of § 203.31.

(f) Unused RSVs transfer to a successor lessee and expire with the lease.

§ 203.33 To which production do I apply the RSV earned by qualified phase 2 and phase 3 ultra-deep wells on my lease or in my unit?

(a) You must apply the RSV allowed in § 203.31(a) and (b) to gas volumes produced from qualified wells on or after May 18, 2007, reported on the Oil and Gas Operations Report, Part A (OGOR-A) for your lease under 30 CFR 1210.102. All gas production from qualified wells reported on the OGOR-A, including production not subject to royalty, counts toward the total lease RSV earned by both deep or ultra-deep wells on the lease.

(b) This paragraph applies to any lease with a qualified phase 2 or phase 3 ultra-deep well that is not within a BSEE-approved unit. Subject to the price conditions of § 203.36, you must apply the RSV prescribed in § 203.31 as required under the following paragraphs (b)(1) and (b)(2) of this section.

(1) You must apply the RSV to the earliest gas production occurring on and after the later of May 18, 2007, or the date the first qualified phase 2 or phase 3 ultra-deep well that earns your lease the RSV begins production (other than test production).

(2) You must apply the RSV to only gas production from qualified wells on your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44.

(c) This paragraph applies to any lease with a qualified phase 2 or phase 3 ultra-deep well where all or part of the lease is within a BSEE-approved unit. Under the unit agreement, a share of the production from all the qualified wells in the unit participating area would be allocated to your lease each month according to the participating area percentages. Subject to the price conditions of § 203.36, you must apply the RSV prescribed in § 203.31 as follows:

(1) You must apply the RSV to the earliest gas production occurring on and after the later of May 18, 2007, or the date that the first qualified phase 2 or phase 3 ultra-deep well that earns your lease the RSV begins production (other than test production).

(2) You must apply the RSV to only gas production:

(i) From qualified wells on the non-unitized area of your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44; and

(ii) Allocated to your lease under a BSEE-approved unit agreement from qualified wells on unitized areas of your lease and on other leases in participating areas of the unit, regardless of their depth, for which the requirements in § 203.35 or § 203.44 have been met. The allocated share under paragraph (a)(2)(ii) of this section does not increase the RSV for your lease.

Example:The east half of your lease A is unitized with all of lease B. There is one qualified phase 2 ultra-deep well on the non-unitized portion of lease A that earns lease A an RSV of 35 BCF under § 203.31, one qualified deep well on the unitized portion of lease A (drilled after the ultra-deep well on the non-unitized portion of that lease) and a qualified phase 2 ultra-deep well on lease B that earns lease B a 35 BCF RSV under § 203.31. The participating area percentages allocate 40 percent of production from both of the unit qualified wells to lease A and 60 percent to lease B. If the non-unitized qualified phase 2 ultra-deep well on lease A produces 12 BCF, and the unitized qualified well on lease A produces 18 BCF, and the qualified well on lease B produces 37 BCF, then the production volume from and allocated to lease A to which the lease A RSV applies is 34 BCF [12 + (18 + 37)(0.40)]. The production volume allocated to lease B to which the lease B RSV applies is 33 BCF [(18 + 37)(0.60)]. None of the volumes produced from a well that is not within a unit participating area may be allocated to other leases in the unit.

(d) You must begin paying royalties when the cumulative production of gas from all qualified wells on your lease, or allocated to your lease under paragraph (b) of this section, reaches the applicable RSV allowed under § 203.31 or § 203.41. For the month in which cumulative production reaches this RSV, you owe royalties on the portion of gas production from or allocated to your lease that exceeds the RSV remaining at the beginning of that month.

§ 203.34 To which production may an RSV earned by qualified phase 2 and phase 3 ultra-deep wells on my lease not be applied?

You may not apply an RSV earned under § 203.31:

(a) To production from completions less than 15,000 feet TVD SS, except in cases where the qualified well is re-perforated in the same reservoir previously perforated deeper than 15,000 feet TVD SS;

(b) To production from a deep well or ultra-deep well on any other lease, except as provided in paragraph (c) of § 203.33;

(c) To any liquid hydrocarbon (oil and condensate) volumes; or

(d) To production from a deep well or ultra-deep well that commenced drilling before:

(1) March 26, 2003, on a lease that is located entirely or partly in water less than 200 meters deep; or

(2) May 18, 2007, on a lease that is located entirely in water more than 200 meters deep.

§ 203.35 What administrative steps must I take to use the RSV earned by a qualified phase 2 or phase 3 ultra-deep well?

To use an RSV earned under § 203.31:

(a) You must notify the BSEE Regional Supervisor for Production and Development in writing of your intent to begin drilling operations on all your ultra-deep wells.

(b) Before beginning production, you must meet any production measurement requirements that the BSEE Regional Supervisor for Production and Development has determined are necessary under 30 CFR part 250, subpart L.

(c)(1) Within 30 days of the beginning of production from any wells that would become qualified phase 2 or phase 3 ultra-deep wells by satisfying the requirements of this section:

(i) Provide written notification to the BSEE Regional Supervisor for Production and Development that production has begun; and

(ii) Request confirmation of the size of the RSV earned by your lease.

(2) If you produced from a qualified phase 2 or phase 3 ultra-deep well before December 18, 2008, you must provide the information in paragraph (c)(1) of this section no later than January 20, 2009.

(d) If you cannot produce from a well that otherwise meets the criteria for a qualified phase 2 ultra-deep well that is an ultra-deep short sidetrack before May 3, 2009, on a lease that is located entirely or partly in water less than 200 meters deep, or before May 3, 2013, on a lease that is located entirely in water more than 200 meters but less than 400 meters deep, the BSEE Regional Supervisor for Production and Development may extend the deadline for beginning production for up to 1 year, based on the circumstances of the particular well involved, if it meets all the following criteria.

(1) The delay occurred after drilling reached the total depth in your well.

(2) Production (other than test production) was expected to begin from the well before May 3, 2009, on a lease that is located entirely or partly in water less than 200 meters deep or before May 3, 2013, on a lease that is located entirely in water more than 200 meters but less than 400 meters deep. You must provide a credible activity schedule with supporting documentation.

(3) The delay in beginning production is for reasons beyond your control, such as adverse weather and accidents which BSEE deems were unavoidable.

§ 203.36 Do I keep royalty relief if prices rise significantly?

(a) You must pay the Office of Natural Resources Revenue royalties on all gas production to which an RSV otherwise would be applied under § 203.33 for any calendar year in which the average daily closing New York Mercantile Exchange (NYMEX) natural gas price exceeds the applicable threshold price shown in the following table.

A price threshold in year 2007 dollars of . . . | Applies to . . .

(1) $10.15 per MMBtu, | (i) The first 25 BCF of RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease that is located in water partly or entirely less than 200 meters deep issued before December 18, 2008; and

(ii) Any RSV earned under § 203.31(b) by a phase 2 ultra-deep well.

(2) $4.55 per MMBtu, | (i) Any RSV earned under § 203.31(a) by a phase 3 ultra-deep well unless the lease terms prescribe a different price threshold;

(ii) The last 10 BCF of the 35 BCF of RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease that is located in water partly or entirely less than 200 meters deep issued before December 18, 2008, and that is not a non-converted lease;

(iii) The last 15 BCF of the 35 BCF of RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a non-converted lease;

(iv) Any RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease in water partly or entirely less than 200 meters deep issued on or after December 18, 2008, unless the lease terms prescribe a different price threshold; and

(v) Any RSV earned under § 203.31(a) by a phase 2 ultra-deep well on a lease in water entirely more than 200 meters deep and entirely less than 400 meters deep.

(3) $4.08 per MMBtu, | (i) The first 20 BCF of RSV earned by a well that is located on a non-converted lease issued in OCS Lease Sale 178.

(4) $5.83 per MMBtu, | (i) The first 20 BCF of RSV earned by a well that is located on a non-converted lease issued in OCS Lease Sales 180, 182, 184, 185, or 187.

(b) For purposes of paragraph (a) of this section, determine the threshold price for any calendar year after 2007 by:

(1) Determining the percentage of change during the year in the Department of Commerce's implicit price deflator for the gross domestic product; and

(2) Adjusting the threshold price for the previous year by that percentage.

(c) The following examples illustrate how this section applies.

Example 1:Assume that a lessee drills and begins producing from a qualified phase 2 ultra-deep well in 2008 on a lease issued in 2004 in less than 200 meters of water that earns the lease an RSV of 35 BCF. Further, assume the well produces a total of 18 BCF by the end of 2009 and in both of those years, the average daily NYMEX closing natural gas price is less than $10.15 (adjusted for inflation after 2007). The lessee does not pay royalty on the 18 BCF because the gas price threshold under paragraph (a)(1) of this section applies to the first 25 BCF of this RSV earned by this phase 2 ultra-deep well. In 2010, the well produces another 13 BCF. In that year, the average daily closing NYMEX natural gas price is greater than $4.55 per MMBtu (adjusted for inflation after 2007), but less than $10.15 per MMBtu (adjusted for inflation after 2007). The first 7 BCF produced in 2010 will exhaust the first 25 BCF (that is subject to the $10.15 threshold) of the 35 BCF RSV that the well earned. The lessee must pay royalty on the remaining 6 BCF produced in 2010, because it is subject to the $4.55 per MMBtu threshold under paragraph (a)(2)(ii) of this section which was exceeded.

Example 2: Assume that a lessee:

(1) Drills and produces from well no.1, a qualified deep well in 2008 to a depth of 15,500 feet TVD SS that earns a 15 BCF RSV for the lease under § 203.41, which would be subject to a price threshold of $10.15 per MMBtu (adjusted for inflation after 2007), meaning the lease is partly or entirely in less than 200 meters of water;

(2) Later in 2008, drills and produces from well no. 2, a second qualified deep well to a depth of 17,000 feet TVD SS that earns no additional RSV (see § 203.41(c)(1)); and

(3) In 2015, drills and produces from well no. 3, a qualified phase 3 ultra-deep well that earns no additional RSV since the lease already has an RSV established by prior deep well production. Further assume that in 2015, the average daily closing NYMEX natural gas price exceeds $4.55 per MMBtu (adjusted for inflation after 2007) but does not exceed $10.15 per MMBtu (adjusted for inflation after 2007). In 2015, any remaining RSV earned by well no. 1 (which would have been applied to production from well nos. 1 and 2 in the intervening years), would be applied to production from all three qualified wells. Because the price threshold applicable to that RSV was not exceeded, the production from all three qualified wells would be royalty-free until the 15 BCF RSV earned by well no. 1 is exhausted.

Example 3:Assume the same initial facts regarding the three wells as in Example 2. Further assume that well no. 1 stopped producing in 2011 after it had produced 8 BCF, and that well no. 2 stopped producing in 2012 after it had produced 5 BCF. Two BCF of the RSV earned by well no. 1 remain. That RSV would be applied to production from well no. 3 until it is exhausted, and the lessee therefore would not pay royalty on those 2 BCF produced in 2015, because the $10.15 per MMBtu (adjusted for inflation after 2007) price threshold is not exceeded. The determination of which price threshold applies to deep gas production depends on when the first qualified well earned the RSV for the lease, not on which wells use the RSV.

Example 4:Assume that in February 2010, a lessee completes and begins producing from an ultra-deep well (at a depth of 21,500 feet TVD SS) on a lease located in 325 meters of water with no prior production from any deep well and no deep water royalty relief. The ultra-deep well would be a phase 2 ultra-deep well (see definition in § 203.0), and would earn the lease an RSV of 35 BCF under §§ 203.30 and 203.31. Further assume that the average daily closing NYMEX natural gas price exceeds $4.55 per MMBtu (adjusted for inflation after 2007) but does not exceed $10.15 per MMBtu (adjusted for inflation after 2007) during 2010. Because the lease is located in more than 200 but less than 400 meters of water, the $4.55 per MMBtu price threshold applies to the whole RSV (see paragraph (a)(2)(v) of this section), and the lessee will owe royalty on all gas produced from the ultra-deep well in 2010.

(d) You must pay any royalty due under this section no later than March 31 of the year following the calendar year for which you owe royalty. If you do not pay by that date, you must pay late payment interest under 30 CFR 1218.54 from April 1 until the date of payment.

(e) Production volumes on which you must pay royalty under this section count as part of your RSV.

7 Royalty Relief for Drilling Deep Gas Wells on Leases Not Subject to Deep Water Royalty Relief
§ 203.40 Which leases are eligible for royalty relief as a result of drilling a deep well or a phase 1 ultra-deep well?

Your lease may receive an RSV under §§ 203.41 through 203.44, and may receive an RSS under §§ 203.45 through 203.47, if it meets all the requirements of this section.

(a) The lease is located in the GOA wholly west of 87 degrees, 30 minutes West longitude in water depths entirely less than 400 meters deep.

(b) The lease has not produced gas or oil from a well with a perforated interval the top of which is 18,000 feet TVD SS or deeper that commenced drilling either:

(1) Before March 26, 2003, on a lease that is located partly or entirely in water less than 200 meters deep; or

(2) Before May 18, 2007, on a lease that is located in water entirely more than 200 meters and entirely less than 400 meters deep.

(c) In the case of a lease located partly or entirely in water less than 200 meters deep, the lease was issued in a lease sale held either:

(1) Before January 1, 2001;

(2) On or after January 1, 2001, and before January 1, 2004, and, in cases where the original lease terms provided for an RSV for deep gas production, the lessee has exercised the option provided for in § 203.49; or

(3) On or after January 1, 2004, and the lease terms provide for royalty relief under §§ 203.41 through 203.47. (Note: Because the original § 203.41 has been divided into new §§ 203.41 and 203.42 and subsequent sections have been redesignated as §§ 203.43 through 203.48, royalty relief in lease terms for leases issued on or after January 1, 2004, should be read as referring to §§ 203.41 through 203.48.)

(d) If the lease is located entirely in more than 200 meters and less than 400 meters of water, it must either:

(1) Have been issued before November 28, 1995, and not been granted deep water royalty relief under 43 U.S.C. 1337(a)(3)(C), added by section 302 of the Deep Water Royalty Relief Act; or

(2) Have been issued after November 28, 2000, and not been granted deep water royalty relief under §§ 203.60 through 203.79.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

§ 203.41 If I have a qualified deep well or a qualified phase 1 ultra-deep well, what royalty relief would my lease earn?

(a) To qualify for a suspension volume under paragraphs (b) or (c) of this section, your lease must meet the requirements in § 203.40 and the requirements in the following table.

If your lease has not . . . | And if it later . . . | Then your lease . . .

(1) produced gas or oil from any deep well or ultra-deep well, | Has a qualified deep well or qualified phase 1 ultra-deep well, | earns an RSV specified in paragraph (b) of this section.

(2) produced gas or oil from a well with a perforated interval whose top is 18,000 feet TVD SS or deeper, | Has a qualified deep well with a perforated interval whose top is 18,000 feet TVD SS or deeper or a qualified phase 1 ultra-deep well, | earns an RSV specified in paragraph (c) of this section.

(b) If your lease meets the requirements in paragraph (a)(1) of this section, it earns the RSV prescribed in the following table:

If you have a qualified deep well or a qualified phase 1 ultra-deep well that is: | Then your lease earns an RSV on this volume of gas production:

(1) An original well with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 15 BCF.

(2) A sidetrack with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 15 BCF.

(3) An original well with a perforated interval the top of which is at least 18,000 feet TVD SS, | 25 BCF.

(4) A sidetrack with a perforated interval the top of which is at least 18,000 feet TVD SS, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 25 BCF.

(c) If your lease meets the requirements in paragraph (a)(2) of this section, it earns the RSV prescribed in the following table. The RSV specified in this paragraph is in addition to any RSV your lease already may have earned from a qualified deep well with a perforated interval whose top is from 15,000 feet to less than 18,000 feet TVD SS.

If you have a qualified deep well or a qualified phase 1 ultra-deep well that is . . . | Then you earn an RSV on this amount of gas production:

(1) An original well or a sidetrack with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 0 BCF.

(2) An original well with a perforated interval the top of which is 18,000 feet TVD SS or deeper, | 10 BCF.

(3) A sidetrack with a perforated interval the top of which is 18,000 feet TVD SS or deeper, | 4 BCF plus 600 MCF times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 10 BCF.

(d) Lessees may request a refund of or recoup royalties paid on production from qualified wells on a lease that is located in water entirely deeper than 200 meters but entirely less than 400 meters deep that:

(1) Occurs before December 18, 2008; and

(2) Is subject to application of an RSV under either § 203.31 or § 203.41.

(e) The following examples illustrate how this section applies, assuming your lease meets the location, prior production, and lease issuance conditions in § 203.40 and paragraph (a) of this section:

Example 1:If you have a qualified deep well that is an original well with a perforated interval the top of which is 16,000 feet TVD SS, your lease earns an RSV of 15 BCF under paragraph (b)(1) of this section. This RSV must be applied to gas production from all qualified wells on your lease, as prescribed in §§ 203.43 and 203.48. However, if the top of the perforated interval is 18,500 feet TVD SS, the RSV is 25 BCF according to paragraph (b)(3) of this section.

Example 2:If you have a qualified deep well that is a sidetrack, with a perforated interval the top of which is 16,000 feet TVD SS and a sidetrack measured depth of 6,789 feet, we round the measured depth to 6,800 feet and your lease earns an RSV of 8.08 BCF under paragraph (b)(2) of this section. This RSV would be applied to gas production from all qualified wells on your lease, as prescribed in §§ 203.43 and 203.48.

Example 3:If you have a qualified deep well that is a sidetrack, with a perforated interval the top of which is 16,000 feet TVD SS and a sidetrack measured depth of 19,500 feet, your lease earns an RSV of 15 BCF. This RSV would be applied to gas production from all qualified wells on your lease, as prescribed in §§ 203.43 and 203.48, even though 4 BCF plus 600 MCF per foot of sidetrack measured depth equals 15.7 BCF because paragraph (b)(2) of this section limits the RSV for a sidetrack at the amount an original well to the same depth would earn.

Example 4: If you have drilled and produced a deep well with a perforated interval the top of which is 16,000 feet TVD SS before March 26, 2003 (and the well therefore is not a qualified well and has earned no RSV under this section), and later drill:

(i) A deep well with a perforated interval the top of which is 17,000 feet TVD SS, your lease earns no RSV (see paragraph (c)(1) of this section);

(ii) A qualified deep well that is an original well with a perforated interval the top of which is 19,000 feet TVD SS, your lease earns an RSV of 10 BCF under paragraph (c)(2) of this section. This RSV would be applied to gas production from qualified wells on your lease, as prescribed in §§ 203.43 and 203.48; or

(iii) A qualified deep well that is a sidetrack with a perforated interval the top of which is 19,000 feet TVD SS, that has a sidetrack measured depth of 7,000 feet, your lease earns an RSV of 8.2 BCF under paragraph (c)(3) of this section. This RSV would be applied to gas production from qualified wells on your lease, as prescribed in §§ 203.43 and 203.48.

Example 5:If you have a qualified deep well that is an original well with a perforated interval the top of which is 16,000 feet TVD SS, and later drill a second qualified well that is an original well with a perforated interval the top of which is 19,000 feet TVD SS, we increase the total RSV for your lease from 15 BCF to 25 BCF under paragraph (c)(2) of this section. We will apply that RSV to gas production from all qualified wells on your lease, as prescribed in §§ 203.43 and 203.48. If the second well has a perforated interval the top of which is 22,000 feet TVD SS (instead of 19,000 feet), the total RSV for your lease would increase to 25 BCF only in 2 situations: (1) If the second well was a phase 1 ultra-deep well, i.e., if drilling began before May 18, 2007, or (2) the exception in § 203.31(b) applies. In both situations, your lease must be partly or entirely in less than 200 meters of water and production must begin on this well before May 3, 2009. If drilling of the second well began on or after May 18, 2007, the second well would be qualified as a phase 2 or phase 3 ultra-deep well and, unless the exception in § 203.31(b) applies, would not earn any additional RSV (as prescribed in § 203.30), so the total RSV for your lease would remain at 15 BCF.

Example 6:If you have a qualified deep well that is a sidetrack, with a perforated interval the top of which is 16,000 feet TVD SS and a sidetrack measured depth of 4,000 feet, and later drill a second qualified well that is a sidetrack, with a perforated interval the top of which is 19,000 feet TVD SS and a sidetrack measured depth of 8,000 feet, we increase the total RSV for your lease from 6.4 BCF [4 + (600 * 4,000)/1,000,000] to 15.2 BCF {6.4 + [4 + (600 * 8,000)/1,000,000)]} under paragraphs (b)(2) and (c)(3) of this section. We would apply that RSV to gas production from all qualified wells on your lease, as prescribed in §§ 203.43 and 203.48. The difference of 8.8 BCF represents the RSV earned by the second sidetrack that has a perforated interval the top of which is deeper than 18,000 feet TVD SS.

§ 203.42 What conditions and limitations apply to royalty relief for deep wells and phase 1 ultra-deep wells?

The conditions and limitations in the following table apply to royalty relief under § 203.41.

If . . . | Then . . .

(a) Your lease has produced gas or oil from a well with a perforated interval the top of which is 18,000 feet TVD SS or deeper, | your lease cannot earn an RSV under § 203.41 as a result of drilling any subsequent deep wells or phase 1 ultra-deep wells.

(b) You determine RSV under § 203.41 for the first qualified deep well or qualified phase 1 ultra-deep well on your lease (whether an original well or a sidetrack) because you drilled and produced it within the time intervals set forth in the definitions for qualified wells, | that determination establishes the total RSV available for that drilling depth interval on your lease (i.e., either 15,000-18,000 feet TVD SS, or 18,000 feet TVD SS and deeper), regardless of the number of subsequent qualified wells you drill to that depth interval.

(c) A qualified deep well or qualified phase 1 ultra-deep well on your lease is within a unitized portion of your lease, | the RSV earned by that well under § 203.41 applies only to production from qualified wells on or allocated to your lease and not to other leases within the unit.

(d) Your qualified deep well or qualified phase 1 ultra-deep well is a directional well (either an original well or a sidetrack) drilled across a lease line, | the lease with the perforated interval that initially produces earns the RSV. However, if the perforated interval crosses a lease line, the lease where the surface of the well is located earns the RSV.

(e) You earn an RSV under § 203.41, | that RSV is in addition to any RSS for your lease under § 203.45 that results from a different wellbore.

(f) Your lease earns an RSV under § 203.41 and later produces from a well that is not a qualified well, | the RSV is not forfeited or terminated, but you may not apply the RSV under § 203.41 to production from the non-qualified well.

(g) You qualify for an RSV under paragraphs (b) or (c) of § 203.41, | you still owe minimum royalties or rentals in accordance with your lease terms.

(h) You transfer your lease, | unused RSVs transfer to a successor lessee and expire with the lease.

Example to paragraph (b):If your first qualified deep well is a sidetrack with a perforated interval whose top is 16,000 feet TVD SS and earns an RSV of 12.5 BCF, and you later drill a qualified original deep well to 17,000 feet TVD SS, the RSV for your lease remains at 12.5 BCF and does not increase to 15 BCF. However, under paragraph (c) of § 203.41, if you subsequently drill a qualified deep well to a depth of 18,000 feet or greater TVD SS, you may earn an additional RSV.

§ 203.43 To which production do I apply the RSV earned from qualified deep wells or qualified phase 1 ultra-deep wells on my lease?

(a) You must apply the RSV prescribed in § 203.41(b) and (c) to gas volumes produced from qualified wells on or after May 3, 2004, reported on the OGOR-A for your lease under 30 CFR 1210.102, as and to the extent prescribed in §§ 203.43 and 203.48.

(1) Except as provided in paragraph (a)(2) of this section, all gas production from qualified wells reported on the OGOR-A, including production that is not subject to royalty, counts toward the lease RSV.

(2) Production to which an RSS applies under §§ 203.45 and 203.46 does not count toward the lease RSV.

(b) This paragraph applies to any lease with a qualified deep well or qualified phase 1 ultra-deep well when no part of the lease is within a BSEE-approved unit. Subject to the price conditions in § 203.48, you must apply the RSV prescribed in § 203.41 as required under the following paragraphs (b)(1) and (b)(2) of this section.

(1) You must apply the RSV to the earliest gas production occurring on and after the later of:

(i) May 3, 2004, for an RSV earned by a qualified deep well or qualified phase 1 ultra-deep well on a lease that is located entirely or partly in water less than 200 meters deep;

(ii) May 18, 2007, for an RSV earned by a qualified deep well on a lease that is located entirely in water more than 200 meters deep; or

(iii) The date that the first qualified well that earns your lease the RSV begins production (other than test production).

(2) You must apply the RSV to only gas production from qualified wells on your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44.

Example 1:On a lease in water less than 200 meters deep, you began drilling an original deep well with a perforated interval the top of which is 18,200 feet TVD SS in September 2003, that became a qualified deep well in July 2004, when it began producing and using the RSV that it earned. You subsequently drill another original deep well with a perforated interval the top of which is 16,600 feet TVD SS, which becomes a qualified deep well when production begins in August 2008. The first well earned an RSV of 25 BCF (see § 203.41(a)(1) and (b)(3)). You must apply any remaining RSV each month beginning in August 2008 to production from both wells until the 25 BCF RSV is fully utilized according to paragraph (b)(2) of this section. If the second well had begun production in August 2009, it would not be a qualified deep well because it started production after expiration in May 2009 of the ability to qualify for royalty relief in this water depth, and could not share any of the remaining RSV (see definition of a qualified deep well in § 203.0).

Example 2:On a lease in water between 200 and 400 meters deep, you begin drilling an original deep well with a perforated interval the top of which is 17,100 feet TVD SS in November 2010 that becomes a qualified deep well in June 2011 when it begins producing and using the RSV. You subsequently drill another original deep well with a perforated interval the top of which is 15,300 feet TVD SS which becomes a qualified deep well by beginning production in October 2011 (see definition of a qualified deep well in § 203.0). Only the first well earns an RSV equal to 15 BCF (see § 203.41(a) and (b)). You must apply any remaining RSV each month beginning in October 2011 to production from both qualified deep wells until the 15 BCF RSV is fully utilized according to paragraph (b)(2) of this section.

(c) This paragraph applies to any lease with a qualified deep well or qualified phase 1 ultra-deep well when all or part of the lease is within a BSEE-approved unit. Under the unit agreement, a share of the production from all the qualified wells in the unit participating area would be allocated to your lease each month according to the participating area percentages. Subject to the price conditions in § 203.48, you must apply the RSV prescribed under § 203.41 as required under the following paragraphs (c)(1) through (3) of this section.

(1) You must apply the RSV to the earliest gas production occurring on and after the later of:

(i) May 3, 2004, for an RSV earned by a qualified well or qualified phase 1 ultra-deep well on a lease that is located entirely or partly in water less than 200 meters deep;

(ii) May 18, 2007, for an RSV earned by a qualified deep well on a lease that is located entirely in water more than 200 meters deep; or

(iii) The date that the first qualified well that earns your lease the RSV begins production (other than test production).

(2) You must apply the RSV to only gas production:

(i) From all qualified wells on the non-unitized area of your lease, regardless of their depth, for which you have met the requirements in § 203.35 or § 203.44; and,

(ii) Allocated to your lease under a BSEE-approved unit agreement from qualified wells on unitized areas of your lease and on unitized areas of other leases in the unit, regardless of their depth, for which the requirements in § 203.35 or § 203.44 have been met.

(3) The allocated share under paragraph (c)(2)(ii) of this section does not increase the RSV for your lease. None of the volumes produced from a well that is not within a unit participating area may be allocated to other leases in the unit.

Example:The east half of your lease A is unitized with all of lease B. There is one qualified 19,000-foot TVD SS deep well on the non-unitized portion of lease A, one qualified 18,500-foot TVD SS deep well on the unitized portion of lease A, and a qualified 19,400-foot TVD SS deep well on lease B. The participating area percentages allocate 32 percent of production from both of the unit qualified deep wells to lease A and 68 percent to lease B. If the non-unitized qualified deep well on lease A produces 12 BCF and the unitized qualified deep well on lease A produces 15 BCF, and the qualified deep well on lease B produces 10 BCF, then the production volume from and allocated to lease A to which the lease an RSV applies is 20 BCF [12 + (15 + 10) * (0.32)]. The production volume allocated to lease B to which the lease B RSV applies is 17 BCF [(15 + 10) * (0.68)].

(d) You must begin paying royalties when the cumulative production of gas from all qualified wells on your lease, or allocated to your lease under paragraph (c) of this section, reaches the applicable RSV allowed under § 203.31 or § 203.41. For the month in which cumulative production reaches this RSV, you owe royalties on the portion of gas production that exceeds the RSV remaining at the beginning of that month.

(e) You may not apply the RSV allowed under § 203.41 to:

(1) Production from completions less than 15,000 feet TVD SS, except in cases where the qualified deep well is re-perforated in the same reservoir previously perforated deeper than 15,000 feet TVD SS;

(2) Production from a deep well or phase 1 ultra-deep well on any other lease, except as provided in paragraph (c) of this section;

(3) Any liquid hydrocarbon (oil and condensate) volumes; or

(4) Production from a deep well or phase 1 ultra-deep well that commenced drilling before:

(i) March 26, 2003, on a lease that is located entirely or partly in water less than 200 meters deep, or

(ii) May 18, 2007, on a lease that is located entirely in water more than 200 meters deep.

§ 203.44 What administrative steps must I take to use the royalty suspension volume?

(a) You must notify the BSEE Regional Supervisor for Production and Development in writing of your intent to begin drilling operations on all deep wells and phase 1 ultra-deep wells; and

(b) Within 30 days of the beginning of production from all wells that would become qualified wells by satisfying the requirements of this section, you must:

(1) Provide written notification to the BSEE Regional Supervisor for Production and Development that production has begun; and

(2) Request confirmation of the size of the royalty suspension volume earned by your lease.

(c) Before beginning production, you must meet any production measurement requirements that the BSEE Regional Supervisor for Production and Development has determined are necessary under 30 CFR part 250, subpart L.

(d) You must provide the information in paragraph (b) of this section by January 20, 2009, if you produced before December 18, 2008, from a qualified deep well or qualified phase 1 ultra-deep well on a lease that is located entirely in water more than 200 meters and less than 400 meters deep.

(e) The BSEE Regional Supervisor for Production and Development may extend the deadline for beginning production for up to one year for a well that cannot begin production before the applicable date prescribed in the definition of “qualified deep well” in § 203.0 if it meets all of the following criteria.

(1) The well otherwise meets the criteria in the definition of a qualified deep well in § 203.0.

(2) The delay in production occurred after reaching total depth in the well.

(3) Production (other than test production) was expected to begin from the well before the applicable deadline in the definition of a qualified deep well in § 203.0. You must provide a credible activity schedule with supporting documentation.

(4) The delay in beginning production is for reasons beyond your control, such as adverse weather and accidents which BSEE deems were unavoidable.

§ 203.45 If I drill a certified unsuccessful well, what royalty relief will my lease earn?

Your lease may earn a royalty suspension supplement. Subject to paragraph (d) of this section, the royalty suspension supplement is in addition to any royalty suspension volume your lease may earn under § 203.41.

(a) If you drill a certified unsuccessful well and you satisfy the administrative requirements of § 203.47, subject to the price conditions in § 203.48, your lease earns an RSS shown in the following table. The RSS is shown in billions of cubic feet of gas equivalent (BCFE) or in thousands of cubic feet of gas equivalent (MCFE) and is applicable to oil and gas production as prescribed in § 203.46.

If you have a certified unsuccessful well that is:— | Then your lease earns an RSS on this volume of oil and gas production as prescribed in this section and § 203.46:—

(1) An original well and your lease has not produced gas or oil from a deep well or an ultra-deep well, | 5 BCFE.

(2) A sidetrack (with a sidetrack measured depth of at least 10,000 feet) and your lease has not produced gas or oil from a deep well or an ultra-deep well, | 0.8 BCFE plus 120 MCFE times sidetrack measured depth (rounded to the nearest 100 feet) but no more than 5 BCFE.

(3) An original well or a sidetrack (with a sidetrack measured depth of at least 10,000 feet) and your lease has produced gas or oil from a deep well with a perforated interval the top of which is from 15,000 to less than 18,000 feet TVD SS, | 2 BCFE.

(b) This paragraph applies to oil and gas volumes you report on the OGOR-A for your lease under 30 CFR 1210.102.

(1) You must apply the RSS prescribed in paragraph (a) of this section, in accordance with the requirements in § 203.46, to all oil and gas produced from the lease:

(i) On or after December 18, 2008, if your lease is located in water more than 200 meters but less than 400 meters deep; or

(ii) On or after May 3, 2004, if your lease is located in water partly or entirely less than 200 meters deep.

(2) Production to which an RSV applies under §§ 203.31 through 203.33 and §§ 203.41 through 203.43 does not count toward the lease RSS. All other production, including production that is not subject to royalty, counts toward the lease RSS.

Example 1:If you drill a certified unsuccessful well that is an original well to a target 19,000 feet TVD SS, your lease earns an RSS of 5 BCFE that would be applied to gas and oil production if your lease has not previously produced from a deep well or an ultra-deep well, or you earn an RSS of 2 BCFE of gas and oil production if your lease has previously produced from a deep well with a perforated interval from 15,000 to less than 18,000 feet TVD SS, as prescribed in § 203.46.

Example 2:If you drill a certified unsuccessful well that is a sidetrack that reaches a target 19,000 feet TVD SS, that has a sidetrack measured depth of 12,545 feet, and your lease has not produced gas or oil from any deep well or ultra-deep well, BSEE rounds the sidetrack measured depth to 12,500 feet and your lease earns an RSS of 2.3 BCFE of gas and oil production as prescribed in § 203.45.

(c) The conversion from oil to gas for using the royalty suspension supplement is specified in § 203.73.

(d) Each lease is eligible for up to two royalty suspension supplements. Therefore, the total royalty suspension supplement for a lease cannot exceed 10 BCFE.

(1) You may not earn more than one royalty suspension supplement from a single wellbore.

(2) If you begin drilling a certified unsuccessful well on one lease but the completion target is on a second lease, the entire royalty suspension supplement belongs to the second lease. However, if the target straddles a lease line, the lease where the surface of the well is located earns the royalty suspension supplement.

(e) If the same wellbore that earns an RSS as a certified unsuccessful well later produces from a perforated interval the top of which is 15,000 feet TVD or deeper and becomes a qualified well, it will be subject to the following conditions:

(1) Beginning on the date production starts, you must stop applying the royalty suspension supplement earned by that wellbore to your lease production.

(2) If the completion of this qualified well is on your lease or, in the case of a directional well, is on another lease, then you must subtract from the royalty suspension volume earned by that qualified well the royalty suspension supplement amounts earned by that wellbore that have already been applied either on your lease or any other lease. The difference represents the royalty suspension volume earned by the qualified well.

(f) If the same wellbore that earned a royalty suspension supplement later has a sidetrack drilled from that wellbore, you are not required to subtract any royalty suspension supplement earned by that wellbore from the royalty suspension volume that may be earned by the sidetrack.

(g) You owe minimum royalties or rentals in accordance with your lease terms notwithstanding any royalty suspension supplements under this section.

§ 203.46 To which production do I apply the royalty suspension supplements from drilling one or two certified unsuccessful wells on my lease?

(a) Subject to the requirements of §§ 203.40, 203.43, 203.45, 203.47, and 203.48 you must apply an RSS in § 203.45 to the earliest oil and gas production:

(1) Occurring on and after the day you file the information under § 203.47(b),

(2) From, or allocated under a BSEE-approved unit agreement to, the lease on which the certified unsuccessful well was drilled, without regard to the drilling depth of the well producing the gas or oil.

(b) If you have a royalty suspension volume for the lease under § 203.41, you must use the royalty suspension volumes for gas produced from qualified wells on the lease before using royalty suspension supplements for gas produced from qualified wells.

Example to paragraph (b):You have two shallow oil wells on your lease. Then you drill a certified unsuccessful well and earn a royalty suspension supplement of 5 BCFE. Thereafter, you begin production from an original well that is a qualified well that earns a royalty suspension volume of 15 BCF. You use only 2 BCFE of the royalty suspension supplement before the oil wells deplete. You must use up the 15 BCF of royalty suspension volume before you use the remaining 3 BCFE of the royalty suspension supplement for gas produced from the qualified well.

(c) If you have no current production on which to apply the RSS allowed under § 203.45, your RSS applies to the earliest subsequent production of gas and oil from, or allocated under a BSEE-approved unit agreement to, your lease.

(d) Unused royalty suspension supplements transfer to a successor lessee and expire with the lease.

(e) You may not apply the RSS allowed under § 203.45 to production from any other lease, except for production allocated to your lease from a BSEE-approved unit agreement. If your certified unsuccessful well is on a lease subject to a BSEE-approved unit agreement, the lessees of other leases in the unit may not apply any portion of the RSS for your lease to production from the other leases in the unit.

(f) You must begin or resume paying royalties when cumulative gas and oil production from, or allocated under a BSEE-approved unit agreement to, your lease (excluding any gas produced from qualified wells subject to a royalty suspension volume allowed under § 203.41) reaches the applicable royalty suspension supplement. For the month in which the cumulative production reaches this royalty suspension supplement, you owe royalties on the portion of gas or oil production that exceeds the amount of the royalty suspension supplement remaining at the beginning of that month.

§ 203.47 What administrative steps do I take to obtain and use the royalty suspension supplement?

(a) Before you start drilling a well on your lease targeted to a reservoir at least 18,000 feet TVD SS, you must notify, in writing, the BSEE Regional Supervisor for Production and Development of your intent to begin drilling operations and the depth of the target.

(b) After drilling the well, you must provide the BSEE Regional Supervisor for Production and Development within 60 days after reaching the total depth in your well:

(1) Information that allows BSEE to confirm that you drilled a certified unsuccessful well as defined under § 203.0, including:

(i) Well log data, if your original well or sidetrack does not meet the producibility requirements of 30 CFR part 550, subpart A; or

(ii) Well log, well test, seismic, and economic data, if your well does meet the producibility requirements of 30 CFR part 550, subpart A; and

(2) Information that allows BSEE to confirm the size of the royalty suspension supplement for a sidetrack, including sidetrack measured depth and supporting documentation.

(c) If you commenced drilling a well that otherwise meets the criteria for a certified unsuccessful well on a lease located entirely in more than 200 meters and entirely less than 400 meters of water on or after May 18, 2007, and finished it before December 18, 2008, you must provide the information in paragraph (b) of this section no later than February 17, 2009.

§ 203.48 Do I keep royalty relief if prices rise significantly?

(a) You must pay royalties on all gas and oil production for which an RSV or an RSS otherwise would be allowed under §§ 203.40 through 203.47 for any calendar year when the average daily closing NYMEX natural gas price exceeds the applicable threshold price shown in the following table.

For a lease located in water . . . | And issued . . . | The applicable threshold price is . . .

(1) Partly or entirely less than 200 meters deep, | before December 18, 2008, | $10.15 per MMBtu, adjusted annually after calendar year 2007 for inflation.

(2) Partly or entirely less than 200 meters deep, | after December 18, 2008, | $4.55 per MMBtu, adjusted annually after calendar year 2007 for inflation unless the lease terms prescribe a different price threshold.

(3) Entirely more than 200 meters and entirely less than 400 meters deep, | on any date, | $4.55 per MMBtu, adjusted annually after calendar year 2007 for inflation unless the lease terms prescribe a different price threshold.

(b) Determine the threshold price for any calendar year after 2007 by adjusting the threshold price in the previous year by the percentage that the implicit price deflator for the gross domestic product, as published by the Department of Commerce, changed during the calendar year.

(c) You must pay any royalty due under this section no later than March 31 of the year following the calendar year for which you owe royalty. If you do not pay by that date, you must pay late payment interest under 30 CFR 1218.54 from April 1 until the date of payment.

(d) Production volumes on which you must pay royalty under this section count as part of your RSV and RSS.

§ 203.49 May I substitute the deep gas drilling provisions in this part for the deep gas royalty relief provided in my lease terms?

(a) You may exercise an option to replace the applicable lease terms for royalty relief related to deep-well drilling with those in § 203.0 and §§ 203.40 through 203.48 if you have a lease issued with royalty relief provisions for deep-well drilling. Such leases:

(1) Must be issued as part of an OCS lease sale held after January 1, 2001, and before April 1, 2004; and

(2) Must be located wholly west of 87 degrees, 30 minutes West longitude in the GOA entirely or partly in water less than 200 meters deep.

(b) To exercise the option under paragraph (a) of this section, you must notify, in writing, the BSEE Regional Supervisor for Production and Development of your decision before September 1, 2004, or 180 days after your lease is issued, whichever is later, and specify the lease and block number.

(c) Once you exercise the option under paragraph (a) of this section, you are subject to all the activity, timing, and administrative requirements pertaining to deep gas royalty relief as specified in §§ 203.40 through 203.48.

(d) Exercising the option under paragraph (a) of this section is irrevocable. If you do not exercise this option, then the terms of your lease apply.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

8 Royalty Relief for End-of-Life Leases
§ 203.50 Who may apply for end-of-life royalty relief?

You may apply for royalty relief in two situations.

(a) Your end-of-life lease (as defined in § 203.2) is an oil and gas lease and has average daily production of at least 100 barrels of oil equivalent (BOE) per month (as calculated in § 203.73) in at least 12 of the past 15 months. The most recent of these 12 months are considered the qualifying months. These 12 months should reflect the basic operation you intend to use until your resources are depleted. If you changed your operation significantly (e.g., begin re-injecting rather than recovering gas) during the qualifying months, or if you do so while we are processing your application, we may defer action on your application until you revise it to show the new circumstances.

(b) Your end-of-life lease is other than an oil and gas lease (e.g., sulphur) and has production in at least 12 of the past 15 months. The most recent of these 12 months are considered the qualifying months.

§ 203.51 How do I apply for end-of-life royalty relief?

You must submit a complete application and the required fee to the appropriate BSEE Regional Director. Your BSEE regional office will provide specific guidance on the report formats. A complete application for relief includes:

(a) An administrative information report (specified in § 203.83) and

(b) A net revenue and relief justification report (specified in § 203.84).

§ 203.52 What criteria must I meet to get relief?

(a) To qualify for relief, you must demonstrate that the sum of royalty payments over the 12 qualifying months exceeds 75 percent of the sum of net revenues (before-royalty revenues minus allowable costs, as defined in § 203.84).

(b) To re-qualify for relief, e.g., either applying for additional relief on top of relief already granted, or applying for relief sometime after your earlier agreement terminated, you must demonstrate that:

(1) You have met the criterion listed in paragraph (a) of this section, and

(2) The 12 required qualifying months of operation have occurred under the current royalty arrangement.

§ 203.53 What relief will BSEE grant?

(a) If we approve your application and you meet certain conditions, we will reduce the pre-application effective royalty rate by one-half on production up to the relief volume amount. If you produce more than the relief volume amount:

(1) We will impose a royalty rate equal to 1.5 times the effective royalty rate on your additional production up to twice the relief volume amount; and

(2) We will impose a royalty rate equal to the effective rate on all production greater than twice the relief volume amount.

(b) Regardless of the level of production or prices (see § 203.54), royalty payments due under end-of-life relief will not exceed the royalty obligations that would have been due at the effective royalty rate.

(1) The effective royalty rate is the average lease rate paid on production during the 12 qualifying months.

(2) The relief volume amount is the average monthly BOE production for the 12 qualifying months.

§ 203.54 How does my relief arrangement for an oil and gas lease operate if prices rise sharply?

In those months when your current reference price rises by at least 25 percent above your base reference price, you must pay the effective royalty rate on all monthly production.

(a) Your current reference price is a weighted average of daily closing prices on the NYMEX for light sweet crude oil and natural gas over the most recent full 12 calendar months;

(b) Your base reference price is a weighted average of daily closing prices on the NYMEX for light sweet crude oil and natural gas during the qualifying months; and

(c) Your weighting factors are the proportions of your total production volume (in BOE) provided by oil and gas during the qualifying months.

§ 203.55 Under what conditions can my end-of-life royalty relief arrangement for an oil and gas lease be ended?

(a) If you have an end-of-life royalty relief arrangement, you may renounce it at any time. The lease rate will return to the effective rate during the qualifying period in the first full month following our receipt of your renouncement of the relief arrangement.

(b) If you pay the effective lease rate for 12 consecutive months, we will terminate your relief. The lease rate will return to the effective rate in the first full month following this termination.

(c) We may stipulate in the letter of approval for individual cases certain events that would cause us to terminate relief because they are inconsistent with an end-of-life situation.

§ 203.56 Does relief transfer when a lease is assigned?

Yes. Royalty relief is based on the lease circumstances, not ownership. It transfers upon lease assignment.

9 Royalty Relief for Pre-Act Deep Water Leases and for Development and Expansion Projects
§ 203.60 Who may apply for royalty relief on a case-by-case basis in deep water in the Gulf of America or offshore of Alaska?

You may apply for royalty relief under §§ 203.61(b) and 203.62 for an individual lease, unit or project if you:

(a) Hold a pre-Act lease (as defined in § 203.0) that we have assigned to an authorized field (as defined in § 203.0);

(b) Propose an expansion project (as defined in § 203.0); or

(c) Propose a development project (as defined in § 203.0).

§ 203.61 How do I assess my chances for getting relief?

You may ask for a nonbinding assessment (a formal opinion on whether a field would qualify for royalty relief) before turning in your first complete application on an authorized field. This field must have a qualifying well under 30 CFR part 550, subpart A, or be on a lease that has allocated production under an approved unit agreement.

(a) To request a nonbinding assessment, you must:

(1) Submit a draft application in the format and detail specified in guidance from the BSEE regional office for the GOA;

(2) Propose to drill at least one more appraisal well if you get a favorable assessment; and

(3) Pay a fee under § 203.3.

(b) You must wait at least 90 days after receiving our assessment to apply for relief under § 203.62.

(c) This assessment is not binding because a complete application may contain more accurate information that does not support our original assessment. It will help you decide whether your proposed inputs for evaluating economic viability and your supporting data and assumptions are adequate.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

§ 203.62 How do I apply for relief?

(a) You must send a complete application and the required fee to the BSEE Regional Director for your region.

(b) Your application for royalty relief offshore Alaska or in deep water in the GOA must include an original and two copies (one set of digital information) of:

(1) Administrative information report;

(2) Economic viability and relief justification report;

(3) G&G report;

(4) Engineering report;

(5) Production report; and

(6) Cost report.

(c) Section 203.82 explains why we are authorized to require these reports.

(d) Sections 203.81, 203.83, and 203.85 through 203.89 describe what these reports must include. The BSEE regional office for your region will guide you on the format for the required reports, and we encourage you to contact this office before preparing your application for this guidance.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

§ 203.63 Does my application have to include all leases in the field?

(a) For authorized fields, we will accept only one joint application for all leases that are part of the designated field on the date of application, except as provided in paragraph (a)(3) of this section and § 203.64. However, we will evaluate all acreage that may eventually become part of the authorized field. Therefore, if you have any other leases that you believe may eventually be part of the authorized field, you must submit data for these leases according to § 203.81.

(1) The Regional Director maintains a Field Names Master List with updates of all leases in each designated field.

(2) To avoid sharing proprietary data with other lessees on the field, you may submit your proprietary G&G report separately from the rest of your application. Your application is not complete until we receive all the required information for each lease on the field. We will not disclose proprietary data when explaining our assumptions and reasons for our determinations under § 203.67.

(3) We will not require a joint application if you show good cause and honest effort to get all lessees in the field to participate. If you must exclude a lease from your application because its lessee will not participate, that lease is ineligible for the royalty relief for the designated field.

(b) If your application seeks only relief for a development project or an expansion project, your application does not have to include all leases in the field.

§ 203.64 How many applications may I file on a field or a development project?

You may file one complete application for royalty relief during the life of the field or for a development project or an expansion project designed to produce a reservoir or set of reservoirs. However, you may send another application if:

(a) You are eligible to apply for a redetermination under § 203.74;

(b) You apply for royalty relief for an expansion project;

(c) You withdraw the application before we make a determination; or

(d) You apply for end-of-life royalty relief.

§ 203.65 How long will BSEE take to evaluate my application?

(a) We will determine within 20 working days if your application for royalty relief is complete. If your application is incomplete, we will explain in writing what it needs. If you withdraw a complete application, you may reapply.

(b) We will evaluate your first application on a field within 180 days, evaluate your first application on a development project or an expansion project within 150 days and evaluate a redetermination under § 203.75 within 120 days after we determine that it is complete.

(c) We may ask to extend the review period for your application under the conditions in the following table.

If . . . | Then we may . . .

(1) We need more records to audit sunk costs, | Ask to extend the 120-day or 180-day evaluation period. The extension we request will equal the number of days between when you receive our request for records and the day we receive the records.

(2) We cannot evaluate your application for a valid reason, such as missing vital information or inconsistent or inconclusive supporting data, | Add another 30 days. We may add more than 30 days, but only if you agree.

(3) We need more data, explanations, or revision, | Ask to extend the 120-day or 180-day evaluation period. The extension we request will equal the number of days between when you receive our request and the day we receive the information.

(d) We may change your assumptions under § 203.62 if our technical evaluation reveals others that are more appropriate. We may consult with you before a final decision and will explain any changes.

(e) We will notify all designated lease operators within a field when royalty relief is granted.

§ 203.66 What happens if BSEE does not act in the time allowed?

If we do not act within the timeframes established under § 203.65, you get royalty relief according to the following table.

If you apply for royalty relief for | And we do not decide within the time specified, | As long as you

(a) An authorized field, | You get the minimum suspension volumes specified in § 203.69, | Abide by §§ 203.70 and 203.76.

(b) An expansion project, | You get a royalty suspension for the first year of production, | Abide by §§ 203.70 and 203.76.

(c) A development project, | You get a royalty suspension for initial production for the number of months that a decision is delayed beyond the stipulated timeframes set by § 203.65, plus all the royalty suspension volume for which you qualify, | Abide by §§ 203.70 and 203.76.

§ 203.67 What economic criteria must I meet to get royalty relief on an authorized field or project?

We will not approve applications if we determine that royalty relief cannot make the field, development project, or expansion project economically viable. Your field or project must be uneconomic while you are paying royalties and must become economic with royalty relief.

§ 203.68 What pre-application costs will BSEE consider in determining economic viability?

(a) We will not consider ineligible costs as set forth in § 203.89(h) in determining economic viability for purposes of royalty relief.

(b) We will consider sunk costs according to the following table.

We will . . . | When determining . . .

(1) Include sunk costs, | Whether a field that includes a pre-Act lease which has not produced, other than test production, before the application or redetermination submission date needs relief to become economic.

(2) Not include sunk costs, | Whether an authorized field, a development project, or an expansion project can become economic with full relief (see § 203.67).

(3) Not include sunk costs, | How much suspension volume is necessary to make the field, a development project, or an expansion project economic (see § 203.69(c)).

(4) Include sunk costs for the project discovery well on each lease, | Whether a development project or an expansion project needs relief to become economic.

§ 203.69 If my application is approved, what royalty relief will I receive?

If we approve your application, subject to certain conditions, we will not collect royalties on a specified suspension volume for your field, development project, or expansion project. Suspension volumes include volumes allocated to a lease under an approved unit agreement, but exclude any volumes of production that are not normally royalty-bearing under the lease or the regulations of this chapter (e.g., fuel gas).

(a) For authorized fields, the minimum royalty-suspension volumes are:

(1) 17.5 million barrels of oil equivalent (MMBOE) for fields in 200 to 400 meters of water;

(2) 52.5 MMBOE for fields in 400 to 800 meters of water; and

(3) 87.5 MMBOE for fields in more than 800 meters of water.

(b) For development projects, any relief we grant applies only to project wells and replaces the royalty relief, if any, with which we issued your lease.

(c) If your project is economic given the royalty relief with which we issued your lease, we will reject the application.

(d) If the lease has earned or may earn deep gas royalty relief under §§ 203.40 through 203.49 or ultra-deep gas royalty relief under §§ 203.30 through 203.36, we will take the deep gas royalty relief or ultra-deep gas royalty relief into account in determining whether further royalty relief for a development project is necessary for production to be economic.

(e) If neither paragraph (c) nor (d) of this section apply, the minimum royalty suspension volumes are as shown in the following table:

For . . . | The minimum royalty suspension volume is . . . | Plus . . .

(1) RS leases in the GOA or leases offshore Alaska, | A volume equal to the combined royalty suspension volumes (or the volume equivalent based on the data in your approved application for other forms of royalty suspension) with which BSEE issued the leases participating in the application that have or plan a well into a reservoir identified in the application, | 10 percent of the median of the distribution of known recoverable resources upon which BSEE based approval of your application from all reservoirs included in the project.

(2) Leases offshore Alaska or other deep water GOA leases issued in sales after November 28, 2000, | A volume equal to 10 percent of the median of the distribution of known recoverable resources upon which BSEE based approval of your application from all reservoirs included in the project.

(f) If your application includes pre-Act leases in different categories of water depth, we apply the minimum royalty suspension volume for the deepest such lease then assigned to the field. We base the water depth and makeup of a field on the water-depth delineations in the “Lease Terms and Economic Conditions” map and the “Fields Directory” documents and updates in effect at the time your application is deemed complete. These publications are available from the BSEE Gulf of America Regional Office.

(g) You will get a royalty suspension volume above the minimum if we determine that you need more to make the field or development project economic.

(h) For expansion projects, the minimum royalty suspension volume equals 10 percent of the median of the distribution of known recoverable resources upon which we based approval of your application from all reservoirs included in your project plus any suspension volumes required under § 203.66. If we determine that your expansion project may be economic only with more relief, we will determine and grant you the royalty suspension volume necessary to make the project economic.

(i) The royalty suspension volume applicable to specific leases will continue through the end of the month in which cumulative production reaches that volume. You must calculate cumulative production from all the leases in the authorized field or project that are entitled to share the royalty suspension volume.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44325, Sept. 15, 2025]

§ 203.70 What information must I provide after BSEE approves relief?

You must submit reports to us as indicated in the following table. Sections 203.81, 203.90, and 203.91 describe what these reports must include. The BSEE Regional Office for your region will prescribe the formats.

Required report | When due to BSEE | Due date extensions

(a) Fabricator's confirmation report. | Within 18 months after approval of relief. | BSEE Director may grant you an extension under § 203.79(c) for up to 6 months.

(b) Post-production report. | Within 120 days after the start of production that is subject to the approved royalty suspension volume. | With acceptable justification from you, the BSEE Regional Director for your region may extend the due date up to 30 days.

§ 203.71 How does BSEE allocate a field's suspension volume between my lease and other leases on my field?

The allocation depends on when production occurs, when we issued the lease, when we assigned it to the field, and whether we award the volume suspension by an approved application or establish it in the lease terms, as prescribed in this section.

(a) If your authorized field has an approved royalty suspension volume under §§ 203.67 and 203.69, we will suspend payment of royalties on production from all leases in the field that participate in the application until their cumulative production equals the approved volume. The following conditions also apply:

If . . . | Then . . . | And . . .

(1) We assign an eligible lease to your authorized field after we approve relief, | We will not change your authorized field's royalty suspension volume determined under § 203.69, | Production from the assigned eligible lease(s) counts toward the royalty suspension volume for the authorized field, but the eligible lease will not share any remaining royalty suspension volume for the authorized field after the eligible lease has produced the volume applicable under 30 CFR 560.114.

(2) We assign a pre-Act or post-November 2000 deep water lease to your field after we approve your application, | We will not change your field's royalty suspension volume, | The assigned lease(s) may share in any remaining royalty relief by filing the short-form application specified in § 203.83 and authorized in § 203.82. An assigned RS lease also gets any portion of its royalty suspension volume remaining even after the field has produced the approved relief volume.

(3) We assign another lease that you operate to your field while we are evaluating your application, | In our evaluation of your authorized field, we will take into account the value of any royalty relief the added lease already has under 30 CFR 560.114 or its lease document. If we find your authorized field still needs additional royalty suspension volume, that volume will be at least the combined royalty suspension volume to which all added leases on the field are entitled, or the minimum suspension volume of the authorized field, whichever is greater, | (i) You toll the time period for evaluation until you modify your application to be consistent with the newly constituted field; (ii) We have an additional 60 days to review the new information; and (iii) The assigned pre-Act lease or royalty suspension lease shares the royalty suspension we grant to the newly constituted field. An eligible lease does not share the royalty suspension we grant to the new field. If you do not agree to toll, we will have to reject your application due to incomplete information. Production from an assigned eligible lease counts toward the royalty suspension volume that we grant under § 203.69 for your authorized field, but you will not owe royalty on production from the eligible lease until it has produced the volume applicable under 30 CFR 560.114.

(4) We assign another operator's lease to your field while we are evaluating your application, | We will change your field's minimum suspension volume provided the assigned lease joins the application and is entitled to a larger minimum suspension volume, | (i) You both toll the time period for evaluation until both of you modify your application to be consistent with the new field; (ii) We have an additional 60 days to review the new information; and (iii) The assigned lease(s) shares the royalty suspension we grant to the new field. If you (the original applicant) do not agree to toll, the other operator's lease retains any suspension volume it has or may share in any relief that we grant by filing the short form application specified in § 203.83 and authorized in § 203.82.

(5) We reassign a well on a pre-Act, eligible, or royalty suspension lease from field A to field B, | The past production from the well counts toward the royalty suspension volume that we grant under § 203.69 to field B, | For any field based relief, the past production for that well will not count toward any royalty suspension volume that we grant under § 203.69 to field A. Moreover, past production from that well will count toward the royalty suspension volume applicable for the lease under 30 CFR 560.114 if the well is on an eligible lease or under 30 CFR 560.124 if the well is on a royalty suspension lease.

(b) When a project has more than one lease, the royalty suspension volume for each lease equals that lease's actual production from the project (or production allocated under an approved unit agreement) until total production for all leases in the project equals the project's approved royalty suspension volume.

(c) You may receive a royalty-suspension volume only if your entire lease is west of 87 degrees, 30 minutes West longitude. If the field lies on both sides of this meridian, only leases located entirely west of the meridian will receive a royalty-suspension volume.

§ 203.72 Can my lease receive more than one suspension volume?

Yes. You may apply for royalty relief that involves more than one suspension volume under § 203.62 in two circumstances.

(a) Each field that includes your lease may receive a separate royalty-suspension volume, if it meets the evaluation criteria of § 203.67.

(b) An expansion project on your lease may receive a separate royalty-suspension volume, even if we have already granted a royalty-suspension volume to the field that encompasses the project. But the reserves associated with the project must not have been part of our original determination, and the project must meet the evaluation criteria of § 203.67.

§ 203.73 How do suspension volumes apply to natural gas?

You must measure natural gas production under the royalty-suspension volume as follows: 5.62 thousand cubic feet of natural gas, measured in accordance with 30 CFR part 250, subpart L, equals one barrel of oil equivalent.

§ 203.74 When will BSEE reconsider its determination?

You may request a redetermination after we withdraw approval or after you renounce royalty relief, unless we withdraw approval due to your providing false or intentionally inaccurate information. Under certain conditions you may also request a redetermination if we deny your application or if you want your approved royalty suspension volume to change. In these instances, to be eligible for a redetermination, at least one of the following four conditions must occur.

(a) You have significant new G&G data and you previously have not either requested a redetermination or reapplied for relief after we withdrew approval or you relinquished royalty relief. “Significant” means that the new G&G data:

(1) Results from drilling new wells or getting new three-dimensional seismic data and information (but not reinterpreting old data);

(2) Did not exist at the time of the earlier application; and

(3) Changes your estimates of gross resource size, quality, or projected flow rates enough to materially affect the results of our earlier determination.

(b) You demonstrate in your new application that the technology that most efficiently develops this field or lease was not considered or deemed feasible in the original application. Your newly proposed technology must improve the profitability, under equivalent market conditions, of the field or lease relative to the development system proposed in the prior application.

(c) Your current reference price decreases by more than 25 percent from your base reference price as calculated under this paragraph.

(1) Your current reference price is a weighted-average of daily closing prices on the NYMEX for light sweet crude oil and natural gas over the most recent full 12 calendar months;

(2) Your base reference price is a weighted average of daily closing prices on the NYMEX for light sweet crude oil and natural gas for the full 12 calendar months preceding the date of your most recently approved application for this royalty relief; and

(3) The weighting factors are the proportions of the total production volume (in BOE) for oil and gas associated with the most likely scenario (identified in §§ 203.85 and 203.88) from your most recently approved application for this royalty relief.

(d) Before starting to build your development and production system, you have revised your estimated development costs, and they are more than 120 percent of the eligible development costs associated with the most likely scenario from your most recently approved application for this royalty relief.

§ 203.75 What risk do I run if I request a redetermination?

If you request a redetermination after we have granted you a suspension volume, you could lose some or all of the previously granted relief. This can happen because you must file a new complete application and pay the required fee, as discussed in § 203.62. We will evaluate your application under § 203.67 using the conditions prevailing at the time of your redetermination request. In our evaluation, we may find that you should receive a larger, equivalent, smaller, or no suspension volume. This means we could find that you do not qualify for the amount of relief previously granted or for any relief at all.

§ 203.76 When might BSEE withdraw or reduce the approved size of my relief?

We will withdraw approval of relief for any of the following reasons.

(a) You change the type of development system proposed in your application (e.g., change from a fixed platform to floating production system, or from an independent development and production system to one with subsea wells tied back to a host production facility, etc.).

(b) You do not start building the proposed development and production system within 18 months of the date we approved your application, unless the BSEE Director grants you an extension under § 203.79(c). If you start building the proposed system and then suspend its construction before completion, and you do not restart continuous building of the proposed system within 18 months of our approval, we will withdraw the relief we granted.

(c) Your actual development costs are less than 80 percent of the eligible development costs estimated in your application's most likely scenario, and you do not report that fact in your post-production development report (§ 203.70). Development costs are those expenditures defined in § 203.89(b) incurred between the application submission date and start of production. If you report this fact in the post-production development report, you may retain the lesser of 50 percent of the original royalty suspension volume or 50 percent of the median of the distribution of the potentially recoverable resources anticipated in your application.

(d) We granted you a royalty-suspension volume after you qualified for a redetermination under § 203.74(c), and we find out your actual development costs are less than 90 percent of the eligible development costs associated with your application's most likely scenario. Development costs are those expenditures defined in § 203.89(b) incurred between your application submission date and start of production.

(e) You do not send us the fabrication confirmation report or the post-production development report, or you provide false or intentionally inaccurate information that was material to our granting royalty relief under this section. You must pay royalties and late-payment interest determined under 30 U.S.C. 1721 and 30 CFR 1218.54 on all volumes for which you used the royalty suspension. You also may be subject to penalties under other provisions of law.

§ 203.77 May I voluntarily give up relief if conditions change?

Yes, you may voluntarily give up relief by sending a letter to that effect to the BSEE Regional office for your region.

§ 203.78 Do I keep relief approved by BSEE under this part for my lease, unit or project if prices rise significantly?

If prices rise above a base price threshold for light sweet crude oil or natural gas, you must pay full royalties on production otherwise subject to royalty relief approved by BSEE under §§ 203.60-203.77 for your lease, unit or project as prescribed in this section.

(a) The following table shows the base price threshold for various types of leases, subject to paragraph (b) of this section. Note that, for post-November 2000 deepwater leases in the GOA price thresholds apply on a lease basis, so different leases on the same development project or expansion project approved for royalty relief may have different price thresholds.

For . . . | The base price threshold is . . .

(1) Pre-Act leases in the GOA, | set by statute.

(2) Post-November 2000 deep water leases in the GOA or leases offshore of Alaska for which the lease or Notice of Sale set a base price threshold, | indicated in your original lease agreement or, if none, those in the Notice of Sale under which your lease was issued.

(3) Post-November 2000 deep water leases in the GOA or leases offshore of Alaska for which the lease or Notice of Sale did not set a base price threshold, | the threshold set by statute for pre-Act leases.

(b) An exception may occur if we determine that the price thresholds in paragraphs (a)(2) or (a)(3) of this section mean the royalty suspension volume set under § 203.69 and in lease terms would provide inadequate encouragement to increase production or development, in which circumstance we could specify a different set of price thresholds on a case-by-case basis.

(c) Suppose your base oil price threshold set under paragraph (a) is $28.00 per barrel, and the daily closing NYMEX light sweet crude oil prices for the previous calendar year exceeds $28.00 per barrel, as adjusted in paragraph (h) of this section. In this case, we retract the royalty relief authorized in this subpart and you must:

(1) Pay royalties on all oil production for the previous year at the lease stipulated royalty rate plus interest (under 30 U.S.C. 1721 and 30 CFR 1218.54) by March 31 of the current calendar year, and

(2) Pay royalties on all your oil production in the current year.

(d) Suppose your base gas price threshold set under paragraph (a) is $3.50 per million British thermal units (Btu), and the daily closing NYMEX light sweet crude oil prices for the previous calendar year exceeds $3.50 per million Btu, as adjusted in paragraph (h) of this section. In this case, we retract the royalty relief authorized in this subpart and you must:

(1) Pay royalties on all gas production for the previous year at the lease stipulated royalty rate plus interest (under 30 U.S.C. 1721 and 30 CFR 1218.54) by March 31 of the current calendar year, and

(2) Pay royalties on all your gas production in the current year.

(e) Production under both paragraphs (c) and (d) of this section counts as part of the royalty-suspension volume.

(f) You are entitled to a refund or credit, with interest, of royalties paid on any production (that counts as part of the royalty-suspension volume):

(1) Of oil if the arithmetic average of the closing prices for the current calendar year is $28.00 per barrel or less, as adjusted in paragraph (h) of this section, and

(2) Of gas if the arithmetic average of the closing natural gas prices for the current calendar year is $3.50 per million Btu or less, as adjusted in paragraph (h) of this section.

(g) You must follow our regulations in the Office of Natural Resources Revenue, 30 CFR chapter XII, for receiving refunds or credits.

(h) We change the prices referred to in paragraphs (c), (d), and (f) of this section periodically. For pre-Act leases, these prices change during each calendar year after 1994 by the percentage that the implicit price deflator for the gross domestic product changed during the preceding calendar year. For post-November 2000 deepwater leases, these prices change as indicated in the lease instrument or in the Notice of Sale under which we issued the lease.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44326, Sept. 15, 2025]

§ 203.79 How do I appeal BSEE's decisions related to royalty relief for a deepwater lease or a development or expansion project?

(a) Once we have designated your lease as part of a field and notified you and other affected operators of the designation, you can request reconsideration by sending the BSEE Director a letter within 15 days that also states your reasons. The BSEE Director's response is the final agency action.

(b) Our decisions on your application for relief from paying royalty under § 203.67 and the royalty-suspension volumes under § 203.69 are final agency actions.

(c) If you cannot start construction by the deadline in § 203.76(b) for reasons beyond your control (e.g., strike at the fabrication yard), you may request an extension up to 1 year by writing the BSEE Director and stating your reasons. The BSEE Director's response is the final agency action.

(d) We will notify you of all final agency actions by certified mail, return receipt requested. Final agency actions are not subject to appeal to the Interior Board of Land Appeals under 30 CFR part 290 and 43 CFR part 4. They are judicially reviewable under section 10(a) of the Administrative Procedure Act (5 U.S.C. 702) only if you file an action within 30 days of the date you receive our decision.

§ 203.80 When can I get royalty relief if I am not eligible for royalty relief under other sections in the subpart?

We may grant royalty relief when it serves the statutory purposes summarized in § 203.1 and our formal relief programs, including but not limited to the applicable levels of the royalty suspension volumes and price thresholds, provide inadequate encouragement to promote development or increase production. Unless your lease lies offshore of Alaska or wholly west of 87 degrees, 30 minutes West longitude in the GOA, your lease must be producing to qualify for relief. Before you may apply for royalty relief apart from our programs for end-of-life leases or for pre-Act deep water leases and development and expansion projects, we must agree that your lease or project has two or more of the following characteristics:

(a) The lease has produced for a substantial period and the lessee can recover significant additional resources. Significant additional resources mean enough to allow production for at least a year more than would be profitable without royalty relief.

(b) Valuable facilities (e.g., a platform or pipeline that would be removed upon lease relinquishment) exist that we do not expect a successor lessee to use. If the facilities are located off the lease, their preservation must depend on continued production from the lease applying for royalty relief. We will only consider an allocable share of costs for off-lease facilities in the relief application.

(c) A substantial risk exists that no new lessee will recover the resources.

(d) The lessee made major efforts to reduce operating costs too recently to use the formal program for royalty relief (e.g., recent significant change in operations).

(e) Circumstances beyond the lessee's control, other than water depth, preclude reliance on one of the existing royalty relief programs.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44326, Sept. 15, 2025]

10 Required Reports
§ 203.81 What supplemental reports do royalty-relief applications require?

(a) You must send us the supplemental reports, indicated in the following table by an X, that apply to your field. Sections 203.83 through 203.91 describe these reports in detail.

Required reports | End-of-life lease | Deep water

Expansion project | Pre-act lease | Development project

(1) Administrative information Report | X | X | X | X

(2) Net revenue & relief justification report | X

(3) Economic viability & relief justification report (RSVP model inputs justified by other required reports) | X | X | X

(4) G&G report | X | X | X

(5) Engineering report | X | X | X

(6) Production report | X | X | X

(7) Deep water cost report | X | X | X

(8) Fabricator's confirmation report | X | X | X

(9) Post-production development report | X | X | X

(b) You must certify that all information in your application, fabricator's confirmation and post-production development reports is accurate, complete, and conforms to the most recent content and presentation guidelines available from the BSEE Regional office for your region.

(c) With your application and post-production development report, you must submit an additional report prepared by an independent CPA that:

(1) Assesses the accuracy of the historical financial information in your report; and

(2) Certifies that the content and presentation of the financial data and information conform to our most recent guidelines on royalty relief. This means the data and information must:

(i) Include only eligible costs that are incurred during the qualification months; and

(ii) Be shown in the proper format.

(d) You must identify the people in the CPA firm who prepared the reports referred to in paragraph (c) of this section and make them available to us to respond to questions about the historical financial information. We may also further review your records to support this information.

§ 203.82 What is BSEE's authority to collect this information?

The Office of Management and Budget (OMB) approved the information collection requirements in part 203 under 44 U.S.C. 3501 et seq., and assigned OMB control number 1010-0071.

(a) We use the information to determine whether royalty relief will result in production that wouldn't otherwise occur. We rely largely on your information to make these determinations.

(1) Your application for royalty relief must contain enough information on finances, economics, reservoirs, G&G characteristics, production, and engineering estimates for us to determine whether:

(i) We should grant relief under the law, and

(ii) The requested relief will ultimately recover more resources and return a reasonable profit on project investments.

(2) Your fabricator confirmation and post-production development reports must contain enough information for us to verify that your application reasonably represented your plans.

(b) Applicants (respondents) are Federal OCS oil and gas lessees. Applications are required to obtain or retain a benefit. Therefore, if you apply for royalty relief, you must provide this information. We will protect information considered proprietary under applicable law and under regulations at § 203.63 and 30 CFR part 250.

(c) The Paperwork Reduction Act of 1995 requires us to inform you that we may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a currently valid OMB control number.

(d) Send comments regarding any aspect of the collection of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36148, June 6, 2016]

§ 203.83 What is in an administrative information report?

This report identifies the field or lease for which royalty relief is requested and must contain the following items:

(a) The field or lease name;

(b) The serial number of leases we have assigned to the field, names of the lease title holders of record, the lease operators, and whether any lease is part of a unit;

(c) Well number, API number, location, and status of each well that has been drilled on the field or lease or project (not required for non-oil and gas leases);

(d) The location of any new wells proposed under the terms of the application (not required for non-oil and gas leases);

(e) A description of field or lease history;

(f) Full information as to whether you will pay royalties or a share of production to anyone other than the United States, the amount you will pay, and how much you will reduce this payment if we grant relief;

(g) The type of royalty relief you are requesting;

(h) Confirmation that BOEM approved a DOCD or supplemental DOCD (Deep Water expansion project applications only); and

(i) A narrative description of the development activities associated with the proposed capital investments and an explanation of proposed timing of the activities and the effect on production (Deep Water applications only).

§ 203.84 What is in a net revenue and relief justification report?

This report presents cash flow data for 12 qualifying months, using the format specified in the “Guidelines for the Application, Review, Approval, and Administration of Royalty Relief for End-of-Life Leases”, U.S. Department of the Interior, BSEE. Qualifying months for an oil and gas lease are the most recent 12 months out of the last 15 months that you produced at least 100 BOE per day on average. Qualifying months for other than oil and gas leases are the most recent 12 of the last 15 months having some production.

(a) The cash flow table you submit must include historical data for:

(1) Lease production subject to royalty;

(2) Total revenues;

(3) Royalty payments out of production;

(4) Total allowable costs; and

(5) Transportation and processing costs.

(b) Do not include in your cash flow table the non-allowable costs listed at 30 CFR 1220.013 or:

(1) OCS rental payments on the lease(s) in the application;

(2) Damages and losses;

(3) Taxes;

(4) Any costs associated with exploratory activities;

(5) Civil or criminal fines or penalties;

(6) Fees for your royalty relief application; and

(7) Costs associated with existing obligations (e.g., royalty overrides or other forms of payment for acquiring the lease, depreciation on previously acquired equipment or facilities).

(c) We may, in reviewing and evaluating your application, disallow costs when you have not shown they are necessary to operate the lease, or if they are inconsistent with end-of-life operations.

§ 203.85 What is in an economic viability and relief justification report?

This report should show that your project appears economic without royalties and sunk costs using the RSVP model we provide. The format of the report and the assumptions and parameters we specify are found in the “Guidelines for the Application, Review, Approval and Administration of the Deep Water Royalty Relief Program,” U.S. Department of the Interior, BSEE. Clearly justify each parameter you set in every scenario you specify in the RSVP. You may provide supplemental information, including your own model and results. The economic viability and relief justification report must contain the following items for an oil and gas lease.

(a) Economic assumptions we provide which include:

(1) Starting oil and gas prices;

(2) Real price growth;

(3) Real cost growth or decline rate, if any;

(4) Base year;

(5) Range of discount rates; and

(6) Tax rate (for use in determining after-tax sunk costs).

(b) Analysis of projected cash flow (from the date of the application using annual totals and constant dollar values) which shows:

(1) Oil and gas production;

(2) Total revenues;

(3) Capital expenditures;

(4) Operating costs;

(5) Transportation costs; and

(6) Before-tax net cash flow without royalties, overrides, sunk costs, and ineligible costs.

(c) Discounted values which include:

(1) Discount rate used (selected from within the range we specify).

(2) Before-tax net present value without royalties, overrides, sunk costs, and ineligible costs.

(d) Demonstrations that:

(1) All costs, gross production, and scheduling are consistent with the data in the G&G, engineering, production, and cost reports (§§ 203.86 through 203.89) and

(2) The development and production scenarios provided in the various reports are consistent with each other and with the proposed development system. You can use up to three scenarios (conservative, most likely, and optimistic), but you must link each to a specific range on the distribution of resources from the RSVP Resource Module.

§ 203.86 What is in a G&G report?

This report supports the reserve and resource estimates used in the economic evaluation and must contain each of the following elements.

(a) Seismic data which includes:

(1) Non-interpreted 2D/3D survey lines reflecting any available state-of-the-art processing technique in a format readable by BSEE and specified by the deep water royalty relief guidelines;

(2) Interpreted 2D/3D seismic survey lines reflecting any available state-of-the-art processing technique identifying all known and prospective pay horizons, wells, and fault cuts;

(3) Digital velocity surveys in the format of the GOA region's letter to lessees of 10/1/90;

(4) Plat map of “shot points;” and

(5) “Time slices” of potential horizons.

(b) Well data which includes:

(1) Hard copies of all well logs in which—

(i) The 1-inch electric log shows pay zones and pay counts and lithologic and paleo correlation markers at least every 500-feet,

(ii) The 1-inch type log shows missing sections from other logs where faulting occurs,

(iii) The 5-inch electric log shows pay zones and pay counts and labeled points used in establishing resistivity of the formation, 100 percent water saturated (Ro) and the resistivity of the undisturbed formation (Rt), and

(iv) The 5-inch porosity logs show pay zones and pay counts and labeled points used in establishing reservoir porosity or labeled points showing values used in calculating reservoir porosity such as bulk density or transit time;

(2) Digital copies of all well logs spudded before December 1, 1995;

(3) Core data, if available;

(4) Well correlation sections;

(5) Pressure data;

(6) Production test results;

(7) Pressure-volume-temperature analysis, if available; and

(8) A table listing the wells and completions, and indicating which sands and fault blocks will be targeted for completion or recompletion.

(c) Map interpretations which includes for each reservoir in the field:

(1) Structure maps consisting of top and base of sand maps showing well and seismic shot point locations;

(2) Isopach maps for net sand, net oil, net gas, all with well locations;

(3) Maps indicating well surface and bottom hole locations, location of development facilities, and shot points; and

(4) An explanation for excluding the reservoirs you are not planning to develop.

(d) Reservoir-specific data which includes:

(1) Probability of reservoir occurrence with hydrocarbons;

(2) Probability the hydrocarbon in the reservoir is all oil and the probability it is all gas;

(3) Distributions or point estimates (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for the parameters used to estimate reservoir size, i.e., acres and net thickness;

(4) Most likely values for porosity, salt water saturation, volume factor for oil formation, and volume factor for gas formation;

(5) Distributions or point estimates (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for recovery efficiency (in percent) and oil or gas recovery (in stock-tank-barrels per acre-foot or in thousands of cubic feet per acre foot);

(6) A gas/oil ratio distribution or point estimate (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for each reservoir;

(7) A yield distribution or point estimate (accompanied by explanations of why distributions less appropriately reflect the uncertainty) for each gas reservoir; and

(8) Reserve or resource distribution by reservoir.

(e) Aggregated reserve and resource data which includes:

(1) The aggregated distributions for reserves and resources (in BOE) and oil fraction for your field computed by the resource module of our RSVP model;

(2) A description of anticipated hydrocarbon quality (i.e., specific gravity); and

(3) The ranges within the aggregated distribution for reserves and resources that define the development and production scenarios presented in the engineering and production reports. Typically there will be three ranges specified by two positive reserve and resource points on the aggregated distribution. The range at the low end of the distribution will be associated with the conservative development and production scenario; the middle range will be related to the most likely development and production scenario; and, the high end range will be consistent with the optimistic development and production scenario.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44326, Sept. 15, 2025]

§ 203.87 What is in an engineering report?

This report defines the development plan and capital requirements for the economic evaluation and must contain the following elements.

(a) A description of the development concept (e.g., tension leg platform, fixed platform, floater type, subsea tieback, etc.) which includes:

(1) Its size along with basic design specifications and drawings; and

(2) The construction schedule.

(b) An identification of planned wells which includes:

(1) The number;

(2) The type (platform, subsea, vertical, deviated, horizontal);

(3) The well depth;

(4) The drilling schedule;

(5) The kind of completion (single, dual, horizontal, etc.); and

(6) The completion schedule.

(c) A description of the production system equipment which includes:

(1) The production capacity for oil and gas and a description of limiting component(s);

(2) Any unusual problems (low gravity, paraffin, etc.);

(3) All subsea structures;

(4) All flowlines; and

(5) Schedule for installing the production system.

(d) A discussion of any plans for multi-phase development which includes the conceptual basis for developing in phases and goals or milestones required for starting later phases.

(e) A set of development scenarios consisting of activity timing and scale associated with each of up to three production profiles (conservative, most likely, optimistic) provided in the production report for your field (§ 203.88). Each development scenario and production profile must denote the likely events should the field size turn out to be within a range represented by one of the three segments of the field size distribution. If you send in fewer than three scenarios, you must explain why fewer scenarios are more efficient across the whole field size distribution.

§ 203.88 What is in a production report?

This report supports your development and production timing and product quality expectations and must contain the following elements.

(a) Production profiles by well completion and field that specify the actual and projected production by year for each of the following products: oil, condensate, gas, and associated gas. The production from each profile must be consistent with a specific level of reserves and resources on the aggregated distribution of field size.

(b) Production drive mechanisms for each reservoir.

§ 203.89 What is in a cost report?

This report lists all actual and projected costs for your field, must explain and document the source of each cost estimate, and must identify the following elements.

(a) Sunk costs. Report sunk costs in dollars not adjusted for inflation and only if you have documentation.

(b) Appraisal, delineation and development costs. Base them on actual spending, current authorization for expenditure, engineering estimates, or analogous projects. These costs cover:

(1) Platform well drilling and average depth;

(2) Platform well completion;

(3) Subsea well drilling and average depth;

(4) Subsea well completion;

(5) Production system (platform); and

(6) Flowline fabrication and installation.

(c) Production costs based on historical costs, engineering estimates, or analogous projects. These costs cover:

(1) Operation;

(2) Equipment; and

(3) Existing royalty overrides (we will not use the royalty overrides in evaluations).

(d) Transportation costs, based on historical costs, engineering estimates, or analogous projects. These costs cover:

(1) Oil or gas tariffs from pipeline or tankerage;

(2) Trunkline and tieback lines; and

(3) Gas plant processing for natural gas liquids.

(e) Abandonment costs, based on historical costs, engineering estimates, or analogous projects. You should provide the costs to plug and abandon only wells and to remove only production systems for which you have not incurred costs as of the time of application submission. You should also include a point estimate or distribution of prospective salvage value for all potentially reusable facilities and materials, along with the source and an explanation of the figures provided.

(f) A set of cost estimates consistent with each one of up to three field-development scenarios and production profiles (conservative, most likely, optimistic). You should express costs in constant real dollar terms for the base year. You may also express the uncertainty of each cost estimate with a minimum and maximum percentage of the base value.

(g) A spending schedule. You should provide costs for each year (in real dollars) for each category in paragraphs (a) through (f) of this section.

(h) A summary of other costs which are ineligible for evaluating your need for relief. These costs cover:

(1) Expenses before first discovery on the field;

(2) Cash bonuses;

(3) Fees for royalty relief applications;

(4) Lease rentals, royalties, and payments of net profit share and net revenue share;

(5) Legal expenses;

(6) Damages and losses;

(7) Taxes;

(8) Interest or finance charges, including those embedded in equipment leases;

(9) Fines or penalties; and

(10) Money spent on previously existing obligations (e.g., royalty overrides or other forms of payment for acquiring a financial position in a lease, expenditures for plugging wells and removing and abandoning facilities that existed on the application submission date).

§ 203.90 What is in a fabricator's confirmation report?

This report shows you have committed in a timely way to the approved system for production. This report must include the following (or its equivalent for unconventionally acquired systems):

(a) A copy of the contract(s) under which the fabrication yard is building the approved system for you;

(b) A letter from the contractor building the system to the BSEE Regional Director for your region certifying when construction started on your system; and

(c) Evidence of an appropriate down payment or equal action that you've started acquiring the approved system.

§ 203.91 What is in a post-production development report?

For each cost category in the deep water cost report, you must compare actual costs up to the date when production starts to your planned pre-production costs. If your application included more than one development scenario, you need to compare actual costs with those in your scenario of most likely development. Also, you must have this report certified by an independent CPA according to § 203.81(c).

Subpart C Federal and Indian Oil [Reserved]
Subpart D Federal and Indian Gas [Reserved]
Subpart E Solid Minerals, General [Reserved]
F Subpart F [Reserved]
Subpart G Other Solid Minerals [Reserved]
Subpart H Geothermal Resources [Reserved]
Subpart I OCS Sulfur [Reserved]

SUBCHAPTER B OFFSHORE

PART 250 OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Editorial Note: Nomenclature changes to part 250 appear at 77 FR 50891, Aug. 22, 2012.

Subpart A General
69 Authority and Definition of Terms
§ 250.101 Authority and applicability.

The Secretary of the Interior (Secretary) authorized the Bureau of Safety and Environmental Enforcement (BSEE) to regulate oil, gas, and sulphur exploration, development, and production operations on the Outer Continental Shelf (OCS). Under the Secretary's authority, the Director requires that all operations:

(a) Be conducted according to the OCS Lands Act (OCSLA), the regulations in this part, BSEE orders, the lease or right-of-way, and other applicable laws, regulations, and amendments; and

(b) Conform to sound conservation practice to preserve, protect, and develop mineral resources of the OCS to:

(1) Make resources available to meet the Nation's energy needs;

(2) Balance orderly energy resource development with protection of the human, marine, and coastal environments;

(3) Ensure the public receives a fair and equitable return on the resources of the OCS;

(4) Preserve and maintain free enterprise competition; and

(5) Minimize or eliminate conflicts between the exploration, development, and production of oil and natural gas and the recovery of other resources.

§ 250.102 What does this part do?

(a) This part 250 contains the regulations of the BSEE Offshore program that govern oil, gas, and sulphur exploration, development, and production operations on the OCS. When you conduct operations on the OCS, you must submit requests, applications, and notices, or provide supplemental information for BSEE approval.

(b) The following table of general references shows where to look for information about these processes.

For information about . . . | Refer to . . .

(1) Applications for permit to drill, | 30 CFR part 250, subpart D.

(2) Development and Production Plans (DPP), | 30 CFR part 550, subpart B.

(3) Downhole commingling, | 30 CFR part 250, subpart K.

(4) Exploration Plans (EP), | 30 CFR part 550, subpart B.

(5) Flaring, | 30 CFR part 250, subpart K.

(6) Gas measurement, | 30 CFR part 250, subpart L.

(7) Off-lease geological and geophysical permits, | 30 CFR part 551.

(8) Oil spill financial responsibility coverage, | 30 CFR part 553.

(9) Oil and gas production safety systems, | 30 CFR part 250, subpart H.

(10) Oil spill response plans, | 30 CFR part 254.

(11) Oil and gas well-completion operations, | 30 CFR part 250, subpart E.

(12) Oil and gas well-workover operations, | 30 CFR part 250, subpart F.

(13) Decommissioning Activities, | 30 CFR part 250, subpart Q.

(14) Platforms and structures, | 30 CFR part 250, subpart I.

(15) Pipelines and Pipeline Rights-of-Way, | 30 CFR part 250, subpart J and 30 CFR part 550, subpart J.

(16) Sulphur operations, | 30 CFR part 250, subpart P.

(17) Training, | 30 CFR part 250, subpart O.

(18) Unitization, | 30 CFR part 250, subpart M.

(19) Safety and Environmental Management Systems (SEMS), | 30 CFR part 250, subpart S.

[76 FR 64462, Oct. 18, 2011, as amended at 36148, June 6, 2016]

§ 250.103 Where can I find more information about the requirements in this part?

BSEE may issue Notices to Lessees and Operators (NTLs) that clarify, supplement, or provide more detail about certain requirements. NTLs may also outline what you must provide as required information in your various submissions to BSEE.

§ 250.104 How may I appeal a decision made under BSEE regulations?

To appeal orders or decisions issued under BSEE regulations in 30 CFR parts 250 to 282, follow the procedures in 30 CFR part 290.

§ 250.105 Definitions.

Terms used in this part will have the meanings given in the Act and as defined in this section:

Act means the OCS Lands Act, as amended (43 U.S.C. 1331 et seq.).

Affected State means with respect to any program, plan, lease sale, or other activity proposed, conducted, or approved under the provisions of the Act, any State:

(1) The laws of which are declared, under section 4(a)(2) of the Act, to be the law of the United States for the portion of the OCS on which such activity is, or is proposed to be, conducted;

(2) Which is, or is proposed to be, directly connected by transportation facilities to any artificial island or installation or other device permanently or temporarily attached to the seabed;

(3) Which is receiving, or according to the proposed activity, will receive oil for processing, refining, or transshipment that was extracted from the OCS and transported directly to such State by means of vessels or by a combination of means including vessels;

(4) Which is designated by the Secretary as a State in which there is a substantial probability of significant impact on or damage to the coastal, marine, or human environment, or a State in which there will be significant changes in the social, governmental, or economic infrastructure, resulting from the exploration, development, and production of oil and gas anywhere on the OCS; or

(5) In which the Secretary finds that because of such activity there is, or will be, a significant risk of serious damage, due to factors such as prevailing winds and currents to the marine or coastal environment in the event of any oil spill, blowout, or release of oil or gas from vessels, pipelines, or other transshipment facilities.

Air pollutant means any airborne agent or combination of agents for which the Environmental Protection Agency (EPA) has established, under section 109 of the Clean Air Act, national primary or secondary ambient air quality standards.

Analyzed geological information means data collected under a permit or a lease that have been analyzed. Analysis may include, but is not limited to, identification of lithologic and fossil content, core analysis, laboratory analyses of physical and chemical properties, well logs or charts, results from formation fluid tests, and descriptions of hydrocarbon occurrences or hazardous conditions.

Ancillary activities mean those activities on your lease or unit that you:

(1) Conduct to obtain data and information to ensure proper exploration or development of your lease or unit; and

(2) Can conduct without Bureau of Ocean Energy Management (BOEM) approval of an application or permit.

Archaeological interest means capable of providing scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics through the application of scientific or scholarly techniques, such as controlled observation, contextual measurement, controlled collection, analysis, interpretation, and explanation.

Archaeological resource means any material remains of human life or activities that are at least 50 years of age and that are of archaeological interest.

Arctic OCS means the Beaufort Sea and Chukchi Sea Planning Areas (for more information on these areas, see the Proposed Final OCS Oil and Gas Leasing Program for 2012-2017 (June 2012) at http://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/2012-2017/Program-Area-Maps/index.aspx).

Arctic OCS conditions means, for the purposes of this part, the conditions operators can reasonably expect during operations on the Arctic OCS. Such conditions, depending on the time of year, include, but are not limited to: Extreme cold, freezing spray, snow, extended periods of low light, strong winds, dense fog, sea ice, strong currents, and dangerous sea states. Remote location, relative lack of infrastructure, and the existence of subsistence hunting and fishing areas are also characteristic of the Arctic region.

Attainment area means, for any air pollutant, an area that is shown by monitored data or that is calculated by air quality modeling (or other methods determined by the Administrator of EPA to be reliable) not to exceed any primary or secondary ambient air quality standards established by EPA.

Best available and safest technology (BAST) means the best available and safest technologies that the BSEE Director determines to be economically feasible wherever failure of equipment would have a significant effect on safety, health, or the environment.

Best available control technology (BACT) means an emission limitation based on the maximum degree of reduction for each air pollutant subject to regulation, taking into account energy, environmental and economic impacts, and other costs. The Regional Supervisor will verify the BACT on a case-by-case basis, and it may include reductions achieved through the application of processes, systems, and techniques for the control of each air pollutant.

BOP systems and related equipment includes all pressure controlling and pressure containing well control equipment that may or will be exposed to the well's MASP during drilling, completion, workover, intervention, or abandonment. Well control equipment includes equipment that is installed for the purpose of pressure control and pressure containment when it becomes necessary to physically enter a well bore during drilling, completion, workover, intervention, or abandonment modes of operation.

Cap and flow system means an integrated suite of equipment and vessels, including a capping stack and associated flow lines, that, when installed or positioned, is used to control the flow of fluids escaping from the well by conveying the fluids to the surface to a vessel or facility equipped to process the flow of oil, gas, and water. A cap and flow system is a high pressure system that includes the capping stack and piping necessary to convey the flowing fluids through the choke manifold to the surface equipment.

Capping stack means a mechanical device, including one that is pre-positioned, that can be installed on top of a subsea or surface wellhead or blowout preventer to stop the uncontrolled flow of fluids into the environment.

Coastal environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the terrestrial ecosystem from the shoreline inward to the boundaries of the coastal zone.

Coastal zone means the coastal waters (including the lands therein and thereunder) and the adjacent shorelands (including the waters therein and thereunder) strongly influenced by each other and in proximity to the shorelands of the several coastal States. The coastal zone includes islands, transition and intertidal areas, salt marshes, wetlands, and beaches. The coastal zone extends seaward to the outer limit of the U.S. territorial sea and extends inland from the shorelines to the extent necessary to control shorelands, the uses of which have a direct and significant impact on the coastal waters, and the inward boundaries of which may be identified by the several coastal States, under the authority in section 305(b)(1) of the Coastal Zone Management Act (CZMA) of 1972.

Competitive reservoir means a reservoir in which there are one or more producible or producing well completions on each of two or more leases or portions of leases, with different lease operating interests, from which the lessees plan future production.

Containment dome means a non-pressurized container that can be used to collect fluids escaping from the well or equipment below the sea surface or from seeps by suspending the device over the discharge or seep location. The containment dome includes all of the equipment necessary to capture and convey fluids to the surface.

Correlative rights when used with respect to lessees of adjacent leases, means the right of each lessee to be afforded an equal opportunity to explore for, develop, and produce, without waste, minerals from a common source.

Data means facts and statistics, measurements, or samples that have not been analyzed, processed, or interpreted.

Departures mean approvals granted by the appropriate BSEE or BOEM representative for operating requirements/procedures other than those specified in the regulations found in this part. These requirements/procedures may be necessary to control a well; properly develop a lease; conserve natural resources, or protect life, property, or the marine, coastal, or human environment.

Development means those activities that take place following discovery of minerals in paying quantities, including but not limited to geophysical activity, drilling, platform construction, and operation of all directly related onshore support facilities, and which are for the purpose of producing the minerals discovered.

Development geological and geophysical (G&G) activities mean those G&G and related data-gathering activities on your lease or unit that you conduct following discovery of oil, gas, or sulphur in paying quantities to detect or imply the presence of oil, gas, or sulphur in commercial quantities.

Director means the Director of BSEE of the U.S. Department of the Interior, or an official authorized to act on the Director's behalf.

District Manager means the BSEE officer with authority and responsibility for operations or other designated program functions for a district within a BSEE Region. For activities on the Alaska OCS, any reference in this part to District Manager means the BSEE Regional Supervisor.

Eastern Gulf of America means all OCS areas of the Gulf of America the BOEM Director decides are adjacent to the State of Florida. The Eastern Gulf of America-is not the same as the Eastern Planning Area, an area established for OCS lease sales.

Emission offsets mean emission reductions obtained from facilities, either onshore or offshore, other than the facility or facilities covered by the proposed Exploration Plan (EP) or Development and Production Plan (DPP).

Enhanced recovery operations mean pressure maintenance operations, secondary and tertiary recovery, cycling, and similar recovery operations that alter the natural forces in a reservoir to increase the ultimate recovery of oil or gas.

Existing facility, as used in 30 CFR 550.303, means an OCS facility described in an Exploration Plan or a Development and Production Plan approved before June 2, 1980.

Exploration means the commercial search for oil, gas, or sulphur. Activities classified as exploration include but are not limited to:

(1) Geophysical and geological (G&G) surveys using magnetic, gravity, seismic reflection, seismic refraction, gas sniffers, coring, or other systems to detect or imply the presence of oil, gas, or sulphur; and

(2) Any drilling conducted for the purpose of searching for commercial quantities of oil, gas, and sulphur, including the drilling of any additional well needed to delineate any reservoir to enable the lessee to decide whether to proceed with development and production.

Facility means:

(1) As used in § 250.130, all installations permanently or temporarily attached to the seabed on the OCS (including manmade islands and bottom-sitting structures). They include mobile offshore drilling units (MODUs) or other vessels engaged in drilling or downhole operations, used for oil, gas or sulphur drilling, production, or related activities. They include all floating production systems (FPSs), variously described as column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. They also include facilities for product measurement and royalty determination (e.g., lease Automatic Custody Transfer Units, gas meters) of OCS production on installations not on the OCS. Any group of OCS installations interconnected with walkways, or any group of installations that includes a central or primary installation with processing equipment and one or more satellite or secondary installations is a single facility. The Regional Supervisor may decide that the complexity of the individual installations justifies their classification as separate facilities.

(2) As used in 30 CFR 550.303, means all installations or devices permanently or temporarily attached to the seabed. They include mobile offshore drilling units (MODUs), even while operating in the “tender assist” mode (i.e., with skid-off drilling units) or other vessels engaged in drilling or downhole operations. They are used for exploration, development, and production activities for oil, gas, or sulphur and emit or have the potential to emit any air pollutant from one or more sources. They include all floating production systems (FPSs), including column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. During production, multiple installations or devices are a single facility if the installations or devices are at a single site. Any vessel used to transfer production from an offshore facility is part of the facility while it is physically attached to the facility.

(3) As used in § 250.490(b), means a vessel, a structure, or an artificial island used for drilling, well completion, well-workover, or production operations.

(4) As used in §§ 250.900 through 250.921, means all installations or devices permanently or temporarily attached to the seabed. They are used for exploration, development, and production activities for oil, gas, or sulphur and emit or have the potential to emit any air pollutant from one or more sources. They include all floating production systems (FPSs), including column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); spars, etc. During production, multiple installations or devices are a single facility if the installations or devices are at a single site. Any vessel used to transfer production from an offshore facility is part of the facility while it is physically attached to the facility.

(5) As used in subpart S of this part, all types of structures permanently or temporarily attached to the seabed (e.g., mobile offshore drilling units (MODUs); floating production systems; floating production, storage and offloading facilities; tension-leg platforms; and spars) that are used for exploration, development, and production activities for oil, gas, or sulphur in the OCS. Facilities also include DOI-regulated pipelines.

Flaring means the burning of natural gas as it is released into the atmosphere.

Gas reservoir means a reservoir that contains hydrocarbons predominantly in a gaseous (single-phase) state.

Gas-well completion means a well completed in a gas reservoir or in the associated gas-cap of an oil reservoir.

Geological and geophysical (G&G) explorations mean those G&G surveys on your lease or unit that use seismic reflection, seismic refraction, magnetic, gravity, gas sniffers, coring, or other systems to detect or imply the presence of oil, gas, or sulphur in commercial quantities.

Governor means the Governor of a State, or the person or entity designated by, or under, State law to exercise the powers granted to such Governor under the Act.

H2S absent means:

(1) Drilling, logging, coring, testing, or producing operations have confirmed the absence of H2S in concentrations that could potentially result in atmospheric concentrations of 20 ppm or more of H2S; or

(2) Drilling in the surrounding areas and correlation of geological and seismic data with equivalent stratigraphic units have confirmed an absence of H2S throughout the area to be drilled.

H2S present means drilling, logging, coring, testing, or producing operations have confirmed the presence of H2S in concentrations and volumes that could potentially result in atmospheric concentrations of 20 ppm or more of H2S.

H2S unknown means the designation of a zone or geologic formation where neither the presence nor absence of H2S has been confirmed.

HPHT environment means when one or more of the following well conditions exist:

(1) The drilling, completion, workover, intervention, injection, production, or abandonment of the well requires pressure controlling or pressure containing equipment, including well control equipment, assigned a pressure rating greater than 15,000 psia or a temperature rating greater than 350 degrees Fahrenheit;

(2) The MASP or SITP is greater than 15,000 psia at the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead; or

(3) The flowing temperature is greater than 350 degrees Fahrenheit at the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead.

Human environment means the physical, social, and economic components, conditions, and factors that interactively determine the state, condition, and quality of living conditions, employment, and health of those affected, directly or indirectly, by activities occurring on the OCS.

Interpreted geological information means geological knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of data and analyzed geological information.

Interpreted geophysical information means geophysical knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of geophysical data and analyzed geophysical information.

Lease means an agreement that is issued under section 8 or maintained under section 6 of the Act and that authorizes exploration for, and development and production of, minerals. The term also means the area covered by that authorization, whichever the context requires.

Lease term pipelines mean those pipelines owned and operated by a lessee or operator that are completely contained within the boundaries of a single lease, unit, or contiguous (not cornering) leases of that lessee or operator.

Lessee means a person who has entered into a lease with the United States to explore for, develop, and produce the leased minerals. The term lessee also includes the BOEM-approved assignee of the lease, and the owner or the BOEM-approved assignee of operating rights for the lease.

Major Federal action means any action or proposal by the Secretary that is subject to the provisions of section 102(2)(C) of the National Environmental Policy Act of 1969, 42 U.S.C. (2)(C) (i.e., an action that will have a significant impact on the quality of the human environment requiring preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act).

Marine environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the marine ecosystem. These include the waters of the high seas, the contiguous zone, transitional and intertidal areas, salt marshes, and wetlands within the coastal zone and on the OCS.

Material remains mean physical evidence of human habitation, occupation, use, or activity, including the site, location, or context in which such evidence is situated.

Maximum efficient rate (MER) means the maximum sustainable daily oil or gas withdrawal rate from a reservoir that will permit economic development and depletion of that reservoir without detriment to ultimate recovery.

Maximum production rate (MPR) means the approved maximum daily rate at which oil or gas may be produced from a specified oil-well or gas-well completion.

Minerals include oil, gas, sulphur, geopressured-geothermal and associated resources, and all other minerals that are authorized by an Act of Congress to be produced.

Natural resources include, without limiting the generality thereof, oil, gas, and all other minerals, and fish, shrimp, oysters, clams, crabs, lobsters, sponges, kelp, and other marine animal and plant life but does not include water power or the use of water for the production of power.

Nonattainment area means, for any air pollutant, an area that is shown by monitored data or that is calculated by air quality modeling (or other methods determined by the Administrator of EPA to be reliable) to exceed any primary or secondary ambient air quality standard established by EPA.

Nonsensitive reservoir means a reservoir in which ultimate recovery is not decreased by high reservoir production rates.

Oil reservoir means a reservoir that contains hydrocarbons predominantly in a liquid (single-phase) state.

Oil reservoir with an associated gas cap means a reservoir that contains hydrocarbons in both a liquid and gaseous (two-phase) state.

Oil-well completion means a well completed in an oil reservoir or in the oil accumulation of an oil reservoir with an associated gas cap.

Operating rights mean any interest held in a lease with the right to explore for, develop, and produce leased substances.

Operator means the person the lessee(s) designates as having control or management of operations on the leased area or a portion thereof. An operator may be a lessee, the BSEE-approved or BOEM-approved designated agent of the lessee(s), or the holder of operating rights under a BOEM-approved operating rights assignment.

Outer Continental Shelf (OCS) means all submerged lands lying seaward and outside of the area of lands beneath navigable waters as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301) whose subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Person includes a natural person, an association (including partnerships, joint ventures, and trusts), a State, a political subdivision of a State, or a private, public, or municipal corporation.

Pipelines are the piping, risers, and appurtenances installed for transporting oil, gas, sulphur, and produced waters.

Processed geological or geophysical information means data collected under a permit or a lease that have been processed or reprocessed. Processing involves changing the form of data to facilitate interpretation. Processing operations may include, but are not limited to, applying corrections for known perturbing causes, rearranging or filtering data, and combining or transforming data elements. Reprocessing is the additional processing other than ordinary processing used in the general course of evaluation. Reprocessing operations may include varying identified parameters for the detailed study of a specific problem area.

Production means those activities that take place after the successful completion of any means for the removal of minerals, including such removal, field operations, transfer of minerals to shore, operation monitoring, maintenance, and workover operations.

Production areas are those areas where flammable petroleum gas, volatile liquids or sulphur are produced, processed (e.g., compressed), stored, transferred (e.g., pumped), or otherwise handled before entering the transportation process.

Projected emissions mean emissions, either controlled or uncontrolled, from a source or sources.

Prospect means a geologic feature having the potential for mineral deposits.

Regional Director means the BSEE officer with responsibility and authority for a Region within BSEE.

Regional Supervisor means the BSEE officer with responsibility and authority for operations or other designated program functions within a BSEE Region.

Right-of-Use and Easement (RUE) means a right to use a portion of the seabed at an OCS site, other than on a lease you own, to construct, secure to the seafloor, use, modify, or maintain platforms, sea floor production equipment, artificial islands, facilities, installations, and other devices, established to support the exploration, development, or production of oil and gas, mineral, or energy resources from an OCS or State submerged lands lease.

Right-of-way pipelines are those pipelines that are contained within:

(1) The boundaries of a single lease or unit, but are not owned and operated by a lessee or operator of that lease or unit;

(2) The boundaries of contiguous (not cornering) leases that do not have a common lessee or operator;

(3) The boundaries of contiguous (not cornering) leases that have a common lessee or operator but are not owned and operated by that common lessee or operator; or

(4) An unleased block(s).

Routine operations, for the purposes of subpart F, mean any of the following operations conducted on a well with the tree installed:

(1) Cutting paraffin;

(2) Removing and setting pump-through-type tubing plugs, gas-lift valves, and subsurface safety valves that can be removed by wireline operations;

(3) Bailing sand;

(4) Pressure surveys;

(5) Swabbing;

(6) Scale or corrosion treatment;

(7) Caliper and gauge surveys;

(8) Corrosion inhibitor treatment;

(9) Removing or replacing subsurface pumps;

(10) Through-tubing logging (diagnostics);

(11) Wireline fishing;

(12) Setting and retrieving other subsurface flow-control devices; and

(13) Acid treatments.

Sensitive reservoir means a reservoir in which the production rate will affect ultimate recovery.

Significant archaeological resource means those archaeological resources that meet the criteria of significance for eligibility to the National Register of Historic Places as defined in 36 CFR 60.4, or its successor.

Source control and containment equipment (SCCE) means the capping stack, cap and flow system, containment dome, and/or other subsea and surface devices, equipment, and vessels the collective purpose of which is to control a spill source and stop the flow of fluids into the environment or to contain fluids escaping into the environment. “Surface devices” refers to equipment mounted or staged on a barge, vessel, or facility to separate, treat, store and/or dispose of fluids conveyed to the surface by the cap and flow system or the containment dome. “Subsea devices” includes, but is not limited to, remotely operated vehicles, anchors, buoyancy equipment, connectors, cameras, controls and other subsea equipment necessary to facilitate the deployment, operation, and retrieval of the SCCE. The SCCE does not include a blowout preventer.

Suspension means a granted or directed deferral of the requirement to produce (Suspension of Production (SOP)) or to conduct leaseholding operations (Suspension of Operations (SOO)).

Venting means the release of gas into the atmosphere without igniting it. This includes gas that is released underwater and bubbles to the atmosphere.

Waste of oil, gas, or sulphur means:

(1) The physical waste of oil, gas, or sulphur;

(2) The inefficient, excessive, or improper use, or the unnecessary dissipation of reservoir energy;

(3) The locating, spacing, drilling, equipping, operating, or producing of any oil, gas, or sulphur well(s) in a manner that causes or tends to cause a reduction in the quantity of oil, gas, or sulphur ultimately recoverable under prudent and proper operations or that causes or tends to cause unnecessary or excessive surface loss or destruction of oil or gas; or

(4) The inefficient storage of oil.

Welding means all activities connected with welding, including hot tapping and burning.

Wellbay is the area on a facility within the perimeter of the outermost wellheads.

Well-completion operations mean the work conducted to establish production from a well after the production-casing string has been set, cemented, and pressure-tested.

Well-control fluid means drilling mud, completion fluid, or workover fluid as appropriate to the particular operation being conducted.

Western Gulf of America means all OCS areas of the Gulf of America except those the BOEM Director decides are adjacent to the State of Florida. The Western Gulf of America is not the same as the Western Planning Area, an area established for OCS lease sales.

Workover operations mean the work conducted on wells after the initial well-completion operation for the purpose of maintaining or restoring the productivity of a well.

You means a lessee, the owner or holder of operating rights, a designated operator or agent of the lessee(s), a pipeline right-of-way holder, or a State lessee granted a right-of-use and easement.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20439, Apr. 5, 2013; 81 FR 46560, July 15, 2016; 88 FR 23579, Apr. 18, 2023; 89 FR 71111, Aug. 30, 2024; 90 FR 44326, Sept. 15, 2025]

70 Performance Standards
§ 250.106 What standards will the Director use to regulate lease operations?

The Director will regulate all operations under a lease, right-of-use and easement, or right-of-way to:

(a) Promote orderly exploration, development, and production of mineral resources;

(b) Prevent injury or loss of life;

(c) Prevent damage to or waste of any natural resource, property, or the environment; and

(d) Cooperate and consult with affected States, local governments, other interested parties, and relevant Federal agencies.

§ 250.107 What must I do to protect health, safety, property, and the environment?

(a) You must protect health, safety, property, and the environment by:

(1) Performing all operations in a safe and workmanlike manner;

(2) Maintaining all equipment and work areas in a safe condition;

(3) Utilizing recognized engineering practices that reduce risks to the lowest level practicable when conducting design, fabrication, installation, operation, inspection, repair, and maintenance activities; and

(4) Complying with all lease, plan, and permit terms and conditions.

(b) You must immediately control, remove, or otherwise correct any hazardous oil and gas accumulation or other health, safety, or fire hazard.

(c) Best available and safest technology. (1) On all new drilling and production operations and, except as provided in paragraph (c)(3) of this section, on existing operations, you must use the best available and safest technologies (BAST) which the Director determines to be economically feasible whenever the Director determines that failure of equipment would have a significant effect on safety, health, or the environment, except where the Director determines that the incremental benefits are clearly insufficient to justify the incremental costs of utilizing such technologies.

(2) Conformance with BSEE regulations will be presumed to constitute the use of BAST unless and until the Director determines that other technologies are required pursuant to paragraph (c)(1) of this section.

(3) The Director may waive the requirement to use BAST on a category of existing operations if the Director determines that use of BAST by that category of existing operations would not be practicable. The Director may waive the requirement to use BAST on an existing operation at a specific facility if you submit a waiver request demonstrating that the use of BAST would not be practicable.

(d) BSEE may issue orders to ensure compliance with this part, including, but not limited to, orders to produce and submit records and to inspect, repair, and/or replace equipment. BSEE may also issue orders to shut-in operations of a component or facility because of a threat of serious, irreparable, or immediate harm to health, safety, property, or the environment posed by those operations or because the operations violate law, including a regulation, order, or provision of a lease, plan, or permit.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26014, Apr. 29, 2016; 81 FR 61915, Sept. 7, 2016]

§ 250.108 What requirements must I follow for cranes and other material-handling equipment?

(a) All cranes installed on fixed platforms must be operated in accordance with American Petroleum Institute's Recommended Practice for Operation and Maintenance of Offshore Cranes, API Recommended Practice 2D (incorporated by reference, see § 250.198).

(b) All cranes installed on fixed platforms must be equipped with a functional anti-two block device.

(c) If a fixed platform is installed after March 17, 2003, all cranes on the platform must meet the requirements of American Petroleum Institute Specification for Offshore Pedestal Mounted Cranes, API Specification 2C (incorporated by reference, see § 250.198).

(d) All cranes manufactured after March 17, 2003, and installed on a fixed platform, must meet the requirements of API Spec 2C.

(e) You must maintain records specific to a crane or the operation of a crane installed on an OCS fixed platform, as follows:

(1) Retain all design and construction records, including installation records for any anti-two block safety devices, for the life of the crane. The records must be kept at the OCS fixed platform.

(2) Retain all inspection, testing, and maintenance records of cranes for at least 4 years. The records must be kept at the OCS fixed platform.

(3) Retain the qualification records of the crane operator and all rigger personnel for at least 4 years. The records must be kept at the OCS fixed platform.

(f) You must operate and maintain all other material-handling equipment in a manner that ensures safe operations and prevents pollution.

[76 FR 66462, Oct. 18, 2011, as amended at 91 FR 35346, June 10, 2026]

Editorial Note:At 91 FR 35346, June 10, 2026, § 250.108(d) was amended; however, the amendment could not be incorporated due to inaccurate instructions.

§ 250.109 What documents must I prepare and maintain related to welding?

(a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan.

(b) You must keep the following at the site where welding occurs:

(1) A copy of the plan and its approval letter; and

(2) Drawings showing the designated safe-welding areas.

§ 250.110 What must I include in my welding plan?

You must include all of the following in the welding plan that you prepare under § 250.109:

(a) Standards or requirements for welders;

(b) How you will ensure that only qualified personnel weld;

(c) Practices and procedures for safe welding that address:

(1) Welding in designated safe areas;

(2) Welding in undesignated areas, including wellbay;

(3) Fire watches;

(4) Maintenance of welding equipment; and

(5) Plans showing all designated safe-welding areas.

(d) How you will prevent spark-producing activities (i.e., grinding, abrasive blasting/cutting and arc-welding) in hazardous locations.

§ 250.111 Who oversees operations under my welding plan?

A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is properly qualified according to the welding plan. This person also must inspect all welding equipment before welding.

§ 250.112 What standards must my welding equipment meet?

Your welding equipment must meet the following requirements:

(a) All engine-driven welding equipment must be equipped with spark arrestors and drip pans;

(b) Welding leads must be completely insulated and in good condition;

(c) Hoses must be leak-free and equipped with proper fittings, gauges, and regulators; and

(d) Oxygen and fuel gas bottles must be secured in a safe place.

§ 250.113 What procedures must I follow when welding?

(a) Before you weld, you must move any equipment containing hydrocarbons or other flammable substances at least 35 feet horizontally from the welding area. You must move similar equipment on lower decks at least 35 feet from the point of impact where slag, sparks, or other burning materials could fall. If moving this equipment is impractical, you must protect that equipment with flame-proofed covers, shield it with metal or fire-resistant guards or curtains, or render the flammable substances inert.

(b) While you weld, you must monitor all water-discharge-point sources from hydrocarbon-handling vessels. If a discharge of flammable fluids occurs, you must stop welding.

(c) If you cannot weld in one of the designated safe-welding areas that you listed in your safe welding plan, you must meet the following requirements:

(1) You may not begin welding until:

(i) The welding supervisor or designated person in charge advises in writing that it is safe to weld.

(ii) You and the designated person in charge inspect the work area and areas below it for potential fire and explosion hazards.

(2) During welding, the person in charge must designate one or more persons as a fire watch. The fire watch must:

(i) Have no other duties while actual welding is in progress;

(ii) Have usable firefighting equipment;

(iii) Remain on duty for 30 minutes after welding activities end; and

(iv) Maintain a continuous surveillance with a portable gas detector during the welding and burning operation if welding occurs in an area not equipped with a gas detector.

(3) You may not weld piping, containers, tanks, or other vessels that have contained a flammable substance unless you have rendered the contents inert and the designated person in charge has determined it is safe to weld. This does not apply to approved hot taps.

(4) You may not weld within 10 feet of a wellbay unless you have shut in all producing wells in that wellbay.

(5) You may not weld within 10 feet of a production area, unless you have shut in that production area.

(6) You may not weld while you drill, complete, workover, or conduct wireline operations unless:

(i) The fluids in the well (being drilled, completed, worked over, or having wireline operations conducted) are noncombustible; and

(ii) You have precluded the entry of formation hydrocarbons into the wellbore by either mechanical means or a positive overbalance toward the formation.

§ 250.114 How must I install, maintain, and operate electrical equipment?

The requirements in this section apply to all electrical equipment on all platforms, artificial islands, fixed structures, and their facilities.

(a) You must classify all areas according to API Recommended Practice 500 (incorporated by reference, see § 250.198), or API Recommended Practice 505 (incorporated by reference, see § 250.198).

(b) Employees who maintain your electrical systems must have expertise in area classification and the performance, operation and hazards of electrical equipment.

(c) You must install all electrical systems according to API Recommended Practice 14F (incorporated by reference, see § 250.198), or API Recommended Practice 14FZ (incorporated by reference, see § 250.198).

(d) On each engine that has an electric ignition system, you must use an ignition system designed and maintained to reduce the release of electrical energy.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36149, June 6, 2016; 91 FR 35346, June 10, 2026]

§ 250.115 What are the procedures for, and effects of, incorporation of documents by reference in this part?

For the documents incorporated by reference in this part:

(a) Incorporation by reference of a document is limited to the edition of the document, or the specific edition and supplement or addendum, that is cited in § 250.198. Future amendments or revisions of the incorporated document are not included. BSEE will publish any changes to the incorporation of the document in the Federal Register and amend § 250.198 as appropriate.

(b) BSEE may make a rule amending the incorporation of a document effective without prior opportunity for public comment when BSEE determines:

(1) That the revisions to the document result in safety improvements or represent new industry standard technology and do not impose undue costs on the affected parties; and

(2) BSEE meets the requirements for making a rule immediately effective under 5 U.S.C. 553.

(c) The effect of incorporation by reference of a document into the regulations in this part is that the incorporated document is a requirement. When a section in this part refers to an incorporated document, you are responsible for complying with the provisions of that entire document, except to the extent that the section that refers to the document provides otherwise. When a section in this part refers to a part of an incorporated document, you are responsible for complying with that part of the document as provided in that section.

(d) Under §§ 250.141 and 250.142, you may comply with a later edition of a specific document incorporated by reference, provided:

(1) You show that complying with the later edition provides a degree of protection, safety, or performance equal to or better than would be achieved by compliance with the listed edition; and

(2) You obtain prior written approval for alternative compliance from the authorized BSEE official.

[84 FR 21968, May 15, 2019]

§§ 250.116-250.117 [Reserved]
71 Gas Storage or Injection
§ 250.118 Will BSEE approve gas injection?

The Regional Supervisor may authorize you to inject gas on the OCS, on and off-lease, to promote conservation of natural resources and to prevent waste.

(a) To receive BSEE approval for injection, you must:

(1) Show that the injection will not result in undue interference with operations under existing leases; and

(2) Submit a written application to the Regional Supervisor for injection of gas.

(b) The Regional Supervisor will approve gas injection applications that:

(1) Enhance recovery;

(2) Prevent flaring of casinghead gas; or

(3) Implement other conservation measures approved by the Regional Supervisor.

§ 250.119 [Reserved]
§ 250.120 How does injecting, storing, or treating gas affect my royalty payments?

(a) If you produce gas from an OCS lease and inject it into a reservoir on the lease or unit for the purposes cited in § 250.118(b), you are not required to pay royalties until you remove or sell the gas from the reservoir.

(b) If you produce gas from an OCS lease and store it according to 30 CFR 550.119, you must pay royalty before injecting it into the storage reservoir.

(c) If you produce gas from an OCS lease and treat it at an off-lease or off-unit location, you must pay royalties when the gas is first produced.

§ 250.121 What happens when the reservoir contains both original gas in place and injected gas?

If the reservoir contains both original gas in place and injected gas, when you produce gas from the reservoir you must use a BSEE-approved formula to determine the amounts of injected or stored gas and gas original to the reservoir.

§ 250.122 What effect does subsurface storage have on the lease term?

If you use a lease area for subsurface storage of gas, it does not affect the continuance or expiration of the lease.

§ 250.123 [Reserved]
§ 250.124 Will BSEE approve gas injection into the cap rock containing a sulphur deposit?

To receive the Regional Supervisor's approval to inject gas into the cap rock of a salt dome containing a sulphur deposit, you must show that the injection:

(a) Is necessary to recover oil and gas contained in the cap rock; and

(b) Will not significantly increase potential hazards to present or future sulphur mining operations.

72 Fees
§ 250.125 Service fees.

(a) The table in this paragraph (a) shows the fees that you must pay to BSEE for the services listed. The fees will be adjusted periodically according to the Implicit Price Deflator for Gross Domestic Product by publication of a document in the Federal Register. If a significant adjustment is needed to arrive at the new actual cost for any reason other than inflation, then a proposed rule containing the new fees will be published in the Federal Register for comment.

Service—processing of the following: | Fee amount | 30 CFR citation

(1) Suspension of Operations/Suspension of Production (SOO/SOP) Request | $2,469 | § 250.171(e).

(2) Deepwater Operations Plan (DWOP) Process:

(i) Project Conceptual Plan | $2,697 | 250.226.

(ii) New or Unusual Technology Conceptual Plan | 7,964 | 250.226.

(iii) New or Unusual Technology Barrier Equipment Conceptual Plan | 15,104 | 250.226.

(iv) DWOP | 10,647 | 250.235.

(v) Revised DWOP | 963 | 250.246.

(vi) Combined Project Conceptual Plan/DWOP | 13,856 | 250.245.

(vii) Supplemental DWOP | 9,626 | 250.247.

(3) Application for Permit to Drill (APD; Form BSEE-0123) | $2,458 for initial applications only; no fee for revisions | § 250.410(d); § 250.513(b).

(4) Application for Permit to Modify (APM; Form BSEE-0124) | $145 | § 240.465(b); § 250.513(b); § 250.613(b); § 250.1704(g).

(5) New Facility Production Safety System Application for facility with more than 125 components | $6,312 A $16,610 additional fee will be charged if BSEE conducts a pre-production inspection of a facility offshore, and $8,638 for an inspection of a facility while in a shipyard A component is a piece of equipment or ancillary system that is protected by one or more of the safety devices required by API Recommended Practice 14C (incorporated by reference, see § 250.198) | § 250.842.

(6) New Facility Production Safety System Application for facility with 25-125 components | $1,528 A $10,430 additional fee will be charged if BSEE conducts a pre-production inspection of a facility offshore, and $5,980 for an inspection of a facility while in a shipyard | § 250.842.

(7) New Facility Production Safety System Application for facility with fewer than 25 components | $758 | § 250.842.

(8) Production Safety System Application—Modification with more than 125 components reviewed | $704 | § 250.842.

(9) Production Safety System Application—Modification with 25-125 components reviewed | $252 | § 250.842.

(10) Production Safety System Application—Modification with fewer than 25 components reviewed | $107 | § 250.842.

(11) Platform Application—Installation—Under the Platform Verification Program | $26,444 | § 250.905(l).

(12) Platform Application—Installation—Fixed Structure Under the Platform Approval Program | $3,787 | § 250.905(l).

(13) Platform Application—Installation—Caisson/Well Protector | $1,927 | § 250.905(l).

(14) Platform Application—Modification/Repair | $4,518 | § 250.905(l).

(15) New Pipeline Application (Lease Term) | $4,119 | § 250.1000(b).

(16) Pipeline Application—Modification (Lease Term) | $2,392 | § 250.1000(b).

(17) Pipeline Application—Modification (ROW) | $4,849 | § 250.1000(b).

(18) Pipeline Repair Notification | $451 | § 250.1008(e).

(19) Pipeline Right-of-Way (ROW) Grant Application | $3,223 | § 250.1015(a).

(20) Pipeline Conversion of Lease Term to ROW | $275 | § 250.1015(a).

(21) Pipeline ROW Assignment | $234 | § 250.1018(b).

(22) 500 Feet from Lease/Unit Line Production Request | $4,527 | § 250.1156(a).

(23) Gas Cap Production Request | $5,761 | § 250.1157(b).

(24) Downhole Commingling Request | $6,722 | § 250.1158(a).

(25) Complex Surface Commingling and Measurement Application | $4,718 | § 250.1202(a); § 250.1203(b); § 250.1204(a).

(26) Simple Surface Commingling and Measurement Application | $1,595 | § 250.1202(a); § 250.1203(b); § 250.1204(a).

(27) Voluntary Unitization Proposal or Unit Expansion | $14,678 | § 250.1303(d).

(28) Unitization Revision | $1,042 | § 250.1303(d).

(29) Application to Remove a Platform or Other Facility | $5,448 | § 250.1727.

(30) Application to Decommission a Pipeline (Lease Term) | $1,328 | § 250.1751(a) or § 250.1752(a).

(31) Application to Decommission a Pipeline (ROW) | $2,524 | § 250.1751(a) or § 250.1752(a).

(b) Payment of the fees listed in paragraph (a) of this section must accompany the submission of the document for approval or be sent to an office identified by the Regional Director. Once a fee is paid, it is nonrefundable, even if an application or other request is withdrawn. If your application is returned to you as incomplete, you are not required to submit a new fee when you submit the amended application.

(c) Verbal approvals are occasionally given in special circumstances. Any action that will be considered a verbal permit approval requires either a paper permit application to follow the verbal approval or an electronic application submittal within 72 hours. Payment must be made with the completed paper or electronic application.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50891, Aug. 22, 2012; 78 FR 60213, Oct. 1, 2013; 81 FR 26014, Apr. 29, 2016; 81 FR 61916, Sept. 7, 2016; 87 FR 19803, Apr. 6, 2022; 89 FR 71111, Aug. 30, 2024; 91 FR 35346, June 10, 2026]

§ 250.126 Electronic payment instructions.

(a) You must file all payments electronically through the Fees for Services Page on the BSEE website at https://www.bsee.gov/who-we-are/working-with-us/Fees-for-Services. This includes, but is not limited to, all OCS applications, permits, or any filing fees. You must include a copy of the Pay.gov confirmation receipt page with your application, permit, or filing fee.

(b) If you submitted an application or permit through eWell, you must use the interactive payment feature in that system, which directs you through Pay.gov to make a payment. It is recommended that you keep a copy of your payment confirmation receipt in the event that any questions arise regarding your transaction.

[81 FR 36149, June 6, 2016; as amended at 87 FR 19803, Apr. 6, 2022]

73 Inspections of Operations
§ 250.130 Why does BSEE conduct inspections?

BSEE will inspect OCS facilities and any vessels engaged in drilling or other downhole operations. These include facilities under jurisdiction of other Federal agencies that we inspect by agreement. We conduct these inspections:

(a) To verify that you are conducting operations according to the Act, the regulations, the lease, right-of-way, the BOEM-approved Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws and regulations; and

(b) To determine whether equipment designed to prevent or ameliorate blowouts, fires, spillages, or other major accidents has been installed and is operating properly according to the requirements of this part.

§ 250.131 Will BSEE notify me before conducting an inspection?

BSEE conducts both scheduled and unscheduled inspections.

§ 250.132 What must I do when BSEE conducts an inspection?

(a) When BSEE conducts an inspection, you must provide:

(1) Access to all platforms, artificial islands, and other installations on your leases or associated with your lease, right-of-use and easement, or right-of-way; and

(2) Helicopter landing sites and refueling facilities for any helicopters we use to regulate offshore operations.

(b) You must make the following available for us to inspect:

(1) The area covered under a lease, right-of-use and easement, right-of-way, or permit;

(2) All improvements, structures, and fixtures on these areas; and

(3) All records of design, construction, operation, maintenance, repairs, or investigations on or related to the area.

§ 250.133 Will BSEE reimburse me for my expenses related to inspections?

Upon request, BSEE will reimburse you for food, quarters, and transportation that you provide for BSEE representatives while they inspect lease facilities and operations. You must send us your reimbursement request within 90 days of the inspection.

74 Disqualification
§ 250.135 What will BSEE do if my operating performance is unacceptable?

BSEE will determine if your operating performance is unacceptable. BSEE will refer a determination of unacceptable performance to BOEM, who may disapprove or revoke your designation as operator on a single facility or multiple facilities. We will give you adequate notice and opportunity for a review by BSEE officials before making a determination that your operating performance is unacceptable.

§ 250.136 How will BSEE determine if my operating performance is unacceptable?

In determining if your operating performance is unacceptable, BSEE will consider, individually or collectively:

(a) Accidents and their nature;

(b) Pollution events, environmental damages and their nature;

(c) Incidents of noncompliance;

(d) Civil penalties;

(e) Failure to adhere to OCS lease obligations; or

(f) Any other relevant factors.

75 Special Types of Approvals
§ 250.140 When will I receive an oral approval?

When you apply for BSEE approval of any activity, we normally give you a written decision. The following table shows circumstances under which we may give an oral approval.

When you . . . | We may . . . | And . . .

(a) Request approval orally, | Give you an oral approval, | You must then confirm the oral request by sending us a written request within 72 hours.

(b) Request approval in writing, | Give you an oral approval if quick action is needed, | We will send you a written approval afterward. It will include any conditions that we place on the oral approval.

(c) Request approval orally for gas flaring, | Give you an oral approval, | You don't have to follow up with a written request unless the Regional Supervisor requires it. When you stop the approved flaring, you must promptly send a letter summarizing the location, dates and hours, and volumes of liquid hydrocarbons produced and gas flared by the approved flaring (see 30 CFR 250, subpart K).

§ 250.141 May I ever use alternate procedures or equipment?

You may use alternate procedures or equipment after receiving approval as described in this section.

(a) Any alternate procedures or equipment that you propose to use must provide a level of safety and environmental protection that equals or surpasses current BSEE requirements.

(b) You must receive the District Manager's or Regional Supervisor's written approval before you can use alternate procedures or equipment.

(c) To receive approval, you must either submit information or give an oral presentation to the appropriate Regional Supervisor. Your presentation must describe the site-specific application(s), performance characteristics, and safety features of the proposed procedure or equipment.

§ 250.142 How do I receive approval for departures?

We may approve departures to the operating requirements. You may apply for a departure by writing to the District Manager or Regional Supervisor.

§§ 250.143-250.144 [Reserved]
§ 250.145 How do I designate an agent or a local agent?

(a) You or your designated operator may designate for the Regional Supervisor's approval, or the Regional Director may require you to designate an agent empowered to fulfill your obligations under the Act, the lease, or the regulations in this part.

(b) You or your designated operator may designate for the Regional Supervisor's approval a local agent empowered to receive notices and submit requests, applications, notices, or supplemental information.

§ 250.146 Who is responsible for fulfilling leasehold obligations?

(a) When you are not the sole lessee, you and your co-lessee(s) are jointly and severally responsible for fulfilling your obligations under the provisions of 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582 unless otherwise provided in these regulations.

(b) If your designated operator fails to fulfill any of your obligations under 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582, the Regional Supervisor may require you or any or all of your co-lessees to fulfill those obligations or other operational obligations under the Act, the lease, or the regulations.

(c) Whenever the regulations in 30 CFR parts 250 through 282 and 30 CFR parts 550 through 582 require the lessee to meet a requirement or perform an action, the lessee, operator (if one has been designated), and the person actually performing the activity to which the requirement applies are jointly and severally responsible for complying with the regulation.

76 Naming and Identifying Facilities and Wells (Does Not Include MODUs)
§ 250.150 How do I name facilities and wells in the Gulf of America Region?

(a) Assign each facility a letter designation except for those types of facilities identified in paragraph (c)(1) of this section. For example, A, B, CA, or CB.

(1) After a facility is installed, rename each predrilled well that was assigned only a number and was suspended temporarily at the mudline or at the surface. Use a letter and number designation. The letter used must be the same as that of the production facility, and the number used must correspond to the order in which the well was completed, not necessarily the number assigned when it was drilled. For example, the first well completed for production on Facility A would be renamed Well A-1, the second would be Well A-2, and so on; and

(2) When you have more than one facility on a block, each facility installed, and not bridge-connected to another facility, must be named using a different letter in sequential order. For example, EC 222A, EC 222B, EC 222C.

(3) When you have more than one facility on multiple blocks in a local area being co-developed, each facility installed and not connected with a walkway to another facility should be named using a different letter in sequential order with the block number corresponding to the block on which the platform is located. For example, EC 221A, EC 222B, and EC 223C.

(b) In naming multiple well caissons, you must assign a letter designation.

(c) In naming single well caissons, you must use certain criteria as follows:

(1) For single well caissons not attached to a facility with a walkway, use the well designation. For example, Well No. 1;

(2) For single well caissons attached to a facility with a walkway, use the same designation as the facility. For example, rename Well No.10 as A-10; and

(3) For single well caissons with production equipment, use a letter designation for the facility name and a letter plus number designation for the well. For example, the Well No. 1 caisson would be designated as Facility A, and the well would be Well A-1.

§ 250.151 How do I name facilities in the Pacific Region?

The operator assigns a name to the facility.

§ 250.152 How do I name facilities in the Alaska Region?

Facilities will be named and identified according to the Regional Director's directions.

§ 250.153 Do I have to rename an existing facility or well?

You do not have to rename facilities installed and wells drilled before January 27, 2000, unless the Regional Director requires it.

§ 250.154 What identification signs must I display?

(a) You must identify all facilities, artificial islands, and mobile offshore drilling units with a sign maintained in a legible condition.

(1) You must display an identification sign that can be viewed from the waterline on at least one side of the platform. The sign must use at least 3-inch letters and figures.

(2) When helicopter landing facilities are present, you must display an additional identification sign that is visible from the air. The sign must use at least 12-inch letters and figures and must also display the weight capacity of the helipad unless noted on the top of the helipad. If this sign is visible to both helicopter and boat traffic, then the sign in paragraph (a)(1) of this section is not required.

(3) Your identification sign must:

(i) List the name of the lessee or designated operator;

(ii) In the GOA-OCS Region, list the area designation or abbreviation and the block number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps;

(iii) In the Pacific OCS Region, list the lease number on which the facility is located; and

(iv) List the name of the platform, structure, artificial island, or mobile offshore drilling unit.

(b) You must identify singly completed wells and multiple completions as follows:

(1) For each singly completed well, list the lease number and well number on the wellhead or on a sign affixed to the wellhead;

(2) For wells with multiple completions, downhole splitter wells, and multilateral wells, identify each completion in addition to the well name and lease number individually on the well flowline at the wellhead; and

(3) For subsea wells that flow individually into separate pipelines, affix the required sign on the pipeline or surface flowline dedicated to that subsea well at a convenient location on the receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is required.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44326, Sept. 15, 2025]

§§ 250.160-250.167 [Reserved]
77 Suspensions
§ 250.168 May operations or production be suspended?

(a) You may request approval of a suspension, or the Regional Supervisor may direct a suspension (Directed Suspension), for all or any part of a lease or unit area.

(b) Depending on the nature of the suspended activity, suspensions are labeled either Suspensions of Operations (SOO) or Suspensions of Production (SOP).

§ 250.169 What effect does suspension have on my lease?

(a) A suspension may extend the term of a lease (see § 250.180(b), (d), and (e)). The extension is equal to the length of time the suspension is in effect, except as provided in paragraph (b) of this section.

(b) A Directed Suspension does not extend the term of a lease when the Regional Supervisor directs a suspension because of:

(1) Gross negligence; or

(2) A willful violation of a provision of the lease or governing statutes and regulations.

§ 250.170 How long does a suspension last?

(a) BSEE may issue suspensions for up to 5 years per suspension. The Regional Supervisor will set the length of the suspension based on the conditions of the individual case involved. BSEE may grant consecutive suspension periods.

(b) An SOO ends automatically when the suspended operation commences.

(c) An SOP ends automatically when production begins.

(d) A Directed Suspension normally ends as specified in the letter directing the suspension.

(e) BSEE may terminate any suspension when the Regional Supervisor determines the circumstances that justified the suspension no longer exist or that other lease conditions warrant termination. The Regional Supervisor will notify you of the reasons for termination and the effective date.

§ 250.171 How do I request a suspension?

You must submit your request for a suspension to the Regional Supervisor, and BSEE must receive the request before the end of the lease term (i.e., end of primary term, end of the 1-year period following the last leaseholding operation, and end of a current suspension). Your request must include:

(a) The justification for the suspension including the length of suspension requested;

(b) A reasonable schedule of work leading to the commencement or restoration of the suspended activity;

(c) A statement that a well has been drilled on the lease and determined to be producible according to 30 CFR 550.115 or 30 CFR 550.116;

(d) A commitment to production (SOP only); and

(e) The service fee listed in § 250.125 of this subpart.

[76 FR 64462, Oct. 18, 2011, as amended at 82 FR 26744, June 9, 2017; 91 FR 35346, June 10, 2026]

§ 250.172 When may the Regional Supervisor grant or direct an SOO or SOP?

The Regional Supervisor may grant or direct an SOO or SOP under any of the following circumstances:

(a) When necessary to comply with judicial decrees prohibiting any activities or the permitting of those activities. The effective date of the suspension will be the effective date required by the action of the court;

(b) When activities pose a threat of serious, irreparable, or immediate harm or damage. This would include a threat to life (including fish and other aquatic life), property, any mineral deposit, or the marine, coastal, or human environment. BSEE may require you to do a site-specific study (see § 250.177(a)).

(c) When necessary for the installation of safety or environmental protection equipment;

(d) When necessary to carry out the requirements of NEPA or to conduct an environmental analysis; or

(e) When necessary to allow for inordinate delays encountered in obtaining required permits or consents, including administrative or judicial challenges or appeals.

§ 250.173 When may the Regional Supervisor direct an SOO or SOP?

The Regional Supervisor may direct a suspension when:

(a) You failed to comply with an applicable law, regulation, order, or provision of a lease or permit; or

(b) The suspension is in the interest of National security or defense.

§ 250.174 When may the Regional Supervisor grant or direct an SOP?

The Regional Supervisor may grant or direct an SOP when the suspension is in the National interest, and it is necessary because the suspension will meet one of the following criteria:

(a) It will allow you to properly develop a lease, including time to construct and install production facilities;

(b) It will allow you time to obtain adequate transportation facilities;

(c) It will allow you time to enter a sales contract for oil, gas, or sulphur. You must show that you are making an effort to enter into the contract(s); or

(d) It will avoid continued operations that would result in premature abandonment of a producing well(s).

§ 250.175 When may the Regional Supervisor grant an SOO?

(a) The Regional Supervisor may grant an SOO when necessary to allow you time to begin drilling or other operations when you are prevented by reasons beyond your control, such as unexpected weather, unavoidable accidents, or drilling rig delays.

(b) The Regional Supervisor may grant an SOO when all of the following conditions are met:

(1) The lease was issued with a primary lease term of 5 years, or with a primary term of 8 years with a requirement to drill within 5 years;

(2) Before the end of the third year of the primary term, you or your predecessor in interest must have acquired and interpreted geophysical information that indicates:

(i) The presence of a salt sheet;

(ii) That all or a portion of a potential hydrocarbon-bearing formation may lie beneath or adjacent to the salt sheet; and

(iii) The salt sheet interferes with identification of the potential hydrocarbon-bearing formation.

(3) The interpreted geophysical information required under paragraph (b)(2) of this section must include full 3-D depth migration beneath the salt sheet and over the entire lease area.

(4) Before requesting the suspension, you have conducted or are conducting additional data processing or interpretation of the geophysical information with the objective of identifying a potential hydrocarbon-bearing formation.

(5) You demonstrate that additional time is necessary to:

(i) Complete current processing or interpretation of existing geophysical data or information;

(ii) Acquire, process, or interpret new geophysical data or information; or

(iii) Drill into the potential hydrocarbon-bearing formation identified as a result of the activities conducted in paragraphs (b)(2), (b)(4), and (b)(5) of this section.

(c) The Regional Supervisor may grant an SOO to conduct additional geological and geophysical data analysis that may lead to the drilling of a well below 25,000 feet true vertical depth below the datum at mean sea level (TVD SS) when all of the following conditions are met:

(1) The lease was issued with a primary lease term of:

(i) Five years; or

(ii) Eight years with a requirement to drill within 5 years.

(2) Before the end of the fifth year of the primary term, you or your predecessor in interest must have acquired and interpreted geophysical information that:

(i) Indicates that all or a portion of a potential hydrocarbon-bearing formation lies below 25,000 feet TVD SS; and

(ii) Includes full 3-D depth migration over the entire lease area.

(3) Before requesting the suspension, you have conducted or are conducting additional data processing or interpretation of the geophysical information with the objective of identifying a potential hydrocarbon-bearing geologic structure or stratigraphic trap lying below 25,000 feet TVD SS.

(4) You demonstrate that additional time is necessary to:

(i) Complete current processing or interpretation of existing geophysical data or information;

(ii) Acquire, process, or interpret new geophysical or geological data or information that would affect the decision to drill the same geologic structure or stratigraphic trap, as determined by the Regional Supervisor, identified in paragraphs (c)(2) and (c)(3) of this section; or

(iii) Drill a well below 25,000 feet TVD SS into the geologic structure or stratigraphic trap identified as a result of the activities conducted in paragraphs (c)(2), (c)(3), and (c)(4)(i) and (ii) of this section.

§ 250.176 Does a suspension affect my royalty payment?

A directed suspension may affect the payment of rental or royalties for the lease as provided in 30 CFR 1218.154.

§ 250.177 What additional requirements may the Regional Supervisor order for a suspension?

If BSEE grants or directs a suspension under paragraph § 250.172(b), the Regional Supervisor may require you to:

(a) Conduct a site-specific study.

(1) The Regional Supervisor must approve or prescribe the scope for any site-specific study that you perform.

(2) The study must evaluate the cause of the hazard, the potential damage, and the available mitigation measures.

(3) You must pay for the study unless you request, and the Regional Supervisor agrees to arrange, payment by another party.

(4) You must furnish copies and results of the study to the Regional Supervisor.

(5) BSEE will make the results available to other interested parties and to the public.

(6) The Regional Supervisor will use the results of the study and any other information that becomes available:

(i) To decide if the suspension can be lifted; and

(ii) To determine any actions that you must take to mitigate or avoid any damage to the environment, life, or property.

(b) Submit a revised Exploration Plan (including any required mitigating measures);

(c) Submit a revised Development and Production Plan (including any required mitigating measures); or

(d) Submit a revised Development Operations Coordination Document according to 30 CFR part 550, subpart B.

78 Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations
§ 250.180 What am I required to do to keep my lease term in effect?

(a) If your lease is in its primary term:

(1) You must submit a report to the District Manager according to paragraphs (h) and (i) of this section whenever production begins initially, whenever production ceases during the last year of the primary term, and whenever production resumes during the last year of the primary term.

(2) Your lease expires at the end of its primary term unless you are conducting operations on your lease (see 30 CFR part 556). For purposes of this section, the term operations means, drilling, well-reworking, or production in paying quantities. The objective of the drilling or well-reworking must be to establish production in paying quantities on the lease.

(b) If you stop conducting operations during the last year of your primary lease term, your lease will expire unless you either resume operations or receive an SOO or an SOP from the Regional Supervisor under § 250.172, § 250.173, § 250.174, or § 250.175 before the end of the year after you stop operations.

(c) If you extend your lease term under paragraph (b) of this section, you must pay rental or minimum royalty, as appropriate, for each year or part of the year during which your lease continues in force beyond the end of the primary lease term.

(d) If you stop conducting operations on a lease that has continued beyond its primary term, your lease will expire unless you resume operations or receive an SOO or an SOP from the Regional Supervisor under § 250.172, § 250.173, § 250.174, or § 250.175 before the end of the year after you stop operations.

(e) You may ask the Regional Supervisor to allow you more than a year to resume operations on a lease continued beyond its primary term when operating conditions warrant. The request must be in writing and explain the operating conditions that warrant a longer period. In allowing additional time, the Regional Supervisor must determine that the longer period is in the National interest, and it conserves resources, prevents waste, or protects correlative rights.

(f) When you begin conducting operations on a lease that has continued beyond its primary term, you must immediately notify the District Manager either orally or by fax or e-mail and follow up with a written report according to paragraph (g) of this section.

(g) If your lease is continued beyond its primary term, you must submit a report to the District Manager under paragraphs (h) and (i) of this section whenever production begins initially, whenever production ceases, whenever production resumes before the end of the 1-year period after having ceased, or whenever drilling or well-reworking operations begin before the end of the 1-year period.

(h) The reports required by paragraphs (a) and (g) of this section must contain:

(1) Name of lessee or operator;

(2) The well number, lease number, area, and block;

(3) As appropriate, the unit agreement name and number; and

(4) A description of the operation and pertinent dates.

(i) You must submit the reports required by paragraphs (a) and (g) of this section within the following timeframes:

(1) Initialization of production—within 5 days of initial production.

(2) Cessation of production—within 15 days after the first full month of zero production.

(3) Resumption of production—within 5 days of resuming production after ceasing production under paragraph (i)(2) of this section.

(4) Drilling or well reworking operations—within 5 days of beginning and completing the leaseholding operations.

(j) For leases continued beyond the primary term, you must immediately report to the District Manager if operations do not begin before the end of the 1-year period.

[76 FR 64462, Oct. 18, 2011, as amended at 82 FR 26744, June 9, 2017]

§§ 250.181-250.185 [Reserved]
79 Information and Reporting Requirements
§ 250.186 What reporting information and report forms must I submit?

(a) You must submit information and reports as BSEE requires.

(1) You may obtain copies of forms from, and submit completed forms to, the District Manager or Regional Supervisor.

(2) Instead of paper copies of forms available from the District Manager or Regional Supervisor, you may use your own computer-generated forms that are equal in size to BSEE's forms. You must arrange the data on your form identical to the BSEE form. If you generate your own form and it omits terms and conditions contained on the official BSEE form, we will consider it to contain the omitted terms and conditions.

(3) You may submit digital data when the Region/District is equipped to accept it.

(b) When BSEE specifies, you must include, for public information, an additional copy of such reports.

(1) You must mark it Public Information

(2) You must include all required information, except information exempt from public disclosure under § 250.197 or otherwise exempt from public disclosure under law or regulation.

§ 250.187 What are BSEE's incident reporting requirements?

(a) You must report all incidents listed in § 250.188(a) and (b) to the District Manager. The specific reporting requirements for these incidents are contained in §§ 250.189 and 250.190.

(b) These reporting requirements apply to incidents that occur on the area covered by your lease, right-of-use and easement, pipeline right-of-way, or other permit issued by BOEM or BSEE, and that are related to operations resulting from the exercise of your rights under your lease, right-of-use and easement, pipeline right-of-way, or permit.

(c) Nothing in this subpart relieves you from making notifications and reports of incidents that may be required by other regulatory agencies.

(d) You must report all spills of oil or other liquid pollutants in accordance with 30 CFR 254.46.

§ 250.188 What incidents must I report to BSEE and when must I report them?

(a) You must report the following incidents to the District Manager immediately via oral communication, and provide a written follow-up report (hard copy or electronically transmitted) within 15 calendar days after the incident:

(1) All fatalities.

(2) All injuries that require the evacuation of the injured person(s) from the facility to shore or to another offshore facility.

(3) All losses of well control. “Loss of well control” means:

(i) Uncontrolled flow of formation or other fluids. The flow may be to an exposed formation (an underground blowout) or at the surface (a surface blowout);

(ii) Flow through a diverter; or

(iii) Uncontrolled flow resulting from a failure of surface equipment or procedures.

(4) All fires and explosions.

(5) All reportable releases of hydrogen sulfide (H2S) gas, as defined in § 250.490(l).

(6) All collisions that result in property or equipment damage greater than $25,000. “Collision” means the act of a moving vessel (including an aircraft) striking another vessel, or striking a stationary vessel or object (e.g., a boat striking a drilling rig or platform). “Property or equipment damage” means the cost of labor and material to restore all affected items to their condition before the damage, including, but not limited to, the OCS facility, a vessel, helicopter, or equipment. It does not include the cost of salvage, cleaning, gas-freeing, dry docking, or demurrage.

(7) All incidents involving structural damage to an OCS facility. “Structural damage” means damage severe enough so that operations on the facility cannot continue until repairs are made.

(8) All incidents involving crane or personnel/material handling operations.

(9) All incidents that damage or disable safety systems or equipment (including firefighting systems).

(b) You must provide a written report of the following incidents to the District Manager within 15 calendar days after the incident:

(1) Any injuries that result in one or more days away from work or one or more days on restricted work or job transfer. One or more days means the injured person was not able to return to work or to all of their normal duties the day after the injury occurred;

(2) All gas releases that initiate equipment or process shutdown;

(3) All incidents that require operations personnel on the facility to muster for evacuation for reasons not related to weather or drills;

(4) All other incidents, not listed in paragraph (a) of this section, resulting in property or equipment damage greater than $25,000.

(c) On the Arctic OCS, in addition to the requirements of paragraphs (a) and (b) of this section, you must provide to the BSEE inspector on location, if one is present, or to the Regional Supervisor, both of the following:

(1) An immediate oral report if any of the following occur:

(i) Any sea ice movement or condition that has the potential to affect your operation or trigger ice management activities;

(ii) The start and termination of ice management activities; or

(iii) Any “kicks” or operational issues that are unexpected and could result in the loss of well control.

(2) Within 24 hours after completing ice management activities, a written report of such activities that conforms to the content requirements in § 250.190.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 46560, July 15, 2016]

§ 250.189 Reporting requirements for incidents requiring immediate notification.

For an incident requiring immediate notification under § 250.188(a), you must notify the District Manager via oral communication immediately after aiding the injured and stabilizing the situation. Your oral communication must provide the following information:

(a) Date and time of occurrence;

(b) Operator, and operator representative's, name and telephone number;

(c) Contractor, and contractor representative's name and telephone number (if a contractor is involved in the incident or injury/fatality);

(d) Lease number, OCS area, and block;

(e) Platform/facility name and number, or pipeline segment number;

(f) Type of incident or injury/fatality;

(g) Operation or activity at time of incident (i.e., drilling, production, workover, completion, pipeline, crane, etc.); and

(h) Description of the incident, damage, or injury/fatality.

§ 250.190 Reporting requirements for incidents requiring written notification.

(a) For any incident covered under § 250.188, you must submit a written report within 15 calendar days after the incident to the District Manager. The report must contain the following information:

(1) Date and time of occurrence;

(2) Operator, and operator representative's name and telephone number;

(3) Contractor, and contractor representative's name and telephone number (if a contractor is involved in the incident or injury);

(4) Lease number, OCS area, and block;

(5) Platform/facility name and number, or pipeline segment number;

(6) Type of incident or injury;

(7) Operation or activity at time of incident (i.e., drilling, production, workover, completion, pipeline, crane etc.);

(8) Description of incident, damage, or injury (including days away from work, restricted work or job transfer), and any corrective action taken; and

(9) Property or equipment damage estimate (in U.S. dollars).

(b) You may submit a report or form prepared for another agency in lieu of the written report required by paragraph (a) of this section, provided the report or form contains all required information.

(c) The District Manager may require you to submit additional information about an incident on a case-by-case basis.

§ 250.191 How does BSEE conduct incident investigations?

Any investigation that BSEE conducts under the authority of sections 22(d)(1) and (2) of the Act (43 U.S.C. 1348(d)(1) and (2)) is a fact-finding proceeding with no adverse parties. The purpose of the investigation is to prepare a public report that determines the cause or causes of the incident. The investigation may involve panel meetings conducted by a chairperson appointed by BSEE. The following requirements apply to any panel meetings involving persons giving testimony:

(a) A person giving testimony may have legal or other representative(s) present to provide advice or counsel while the person is giving testimony. The chairperson may require a verbatim transcript to be made of all oral testimony. The chairperson also may accept a sworn written statement in lieu of oral testimony.

(b) Only panel members, and any experts the panel deems necessary, may address questions to any person giving testimony.

(c) The chairperson may issue subpoenas to persons to appear and provide testimony or documents at a panel meeting. A subpoena may not require a person to attend a panel meeting held at a location more than 100 miles from where a subpoena is served.

(d) Any person giving testimony may request compensation for mileage, and fees for services, within 90 days after the panel meeting. The compensated expenses must be similar to mileage and fees the U.S. District Courts allow.

§ 250.192 What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?

(a) You must submit evacuation statistics to the Regional Supervisor for a natural occurrence, such as a hurricane, a tropical storm, or an earthquake. Statistics include facilities and rigs evacuated and the amount of production shut-in for gas and oil. You must:

(1) Submit the statistics by fax or email (for activities in the BSEE GOA-OCS Region, use Form BSEE-0132) as soon as possible when evacuation occurs. In lieu of submitting your statistics by fax or email, you may submit them electronically in accordance with 30 CFR 250.186(a)(3);

(2) Submit the statistics on a daily basis by 11 a.m., as conditions allow, during the period of shut-in and evacuation;

(3) Inform BSEE when you resume production; and

(4) Submit the statistics either by BSEE district, or the total figures for your operations in a BSEE region.

(b) If your facility, production equipment, or pipeline is damaged by a natural occurrence, you must:

(1) Submit an initial damage report to the Regional Supervisor within 48 hours after you complete your initial evaluation of the damage. You must use Form BSEE-0143, Facility/Equipment Damage Report, to make this and all subsequent reports. In lieu of submitting Form BSEE-0143 by fax or e-mail, you may submit the damage report electronically in accordance with 30 CFR 250.186(a)(3). In the report, you must:

(i) Name the items damaged (e.g., platform or other structure, production equipment, pipeline);

(ii) Describe the damage and assess the extent of the damage (major, medium, minor); and

(iii) Estimate the time it will take to replace or repair each damaged structure and piece of equipment and return it to service. The initial estimate need not be provided on the form until availability of hardware and repair capability has been established (not to exceed 30 days from your initial report).

(2) Submit subsequent reports monthly and immediately whenever information submitted in previous reports changes until the damaged structure or equipment is returned to service. In the final report, you must provide the date the item was returned to service.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44326, Sept. 15, 2025]

§ 250.193 Reports and investigations of possible violations.

(a) Any person may report to BSEE any hazardous or unsafe working condition on any facility engaged in OCS activities, and any possible violation or failure to comply with:

(1) Any provision of the Act,

(2) Any provision of a lease, approved plan, or permit issued under the Act,

(3) Any provision of any regulation or order issued under the Act, or

(4) Any other Federal law relating to safety of offshore oil and gas operations.

(b) To make a report under this section, a person is not required to know whether any legal requirement listed in paragraph (a) of this section has been violated.

(c) When BSEE receives a report of a possible violation, or when a BSEE employee detects a possible violation, BSEE will investigate according to BSEE procedures and notify any other Federal agency(ies) for further investigation, as appropriate.

(d) BSEE investigations of possible violations may include:

(1) Conducting interviews of personnel;

(2) Requiring the prompt production of documents, data, and other evidence;

(3) Requiring the preservation of all relevant evidence and access for BSEE investigators to such evidence; and

(4) Taking other actions and imposing other requirements as necessary to investigate possible violations and assure an orderly investigation.

(e)(1) Reports should contain sufficient credible information to establish a reasonable basis for BSEE to investigate whether a violation or other hazardous or unsafe working condition exists.

(2) To report hazardous or unsafe working conditions or a possible violation:

(i) Contact BSEE by:

(A) Phone at 1-877-440-0173 (BSEE Toll-free Safety Hotline),

(B) Internet at www.bsee.gov, or

(C) Mail to: U.S. DOI/BSEE, 1849 C Street NW., Mail Stop 5438, Washington, DC 20240 Attention: IRU Hotline Operations.

(ii) Include the following items in the report:

(A) Name, address, and telephone number should be provided if you do not want to remain anonymous;

(B) The specific concern, provision or Federal law, if known, referenced in (a) that a person violated or with which a person failed to comply; and

(C) Any other facts, data, and applicable information.

(f) When a possible violation is reported, BSEE will protect a person's identity to the extent authorized by law.

[78 FR 20439, Apr. 5, 2013, as amended at 81 FR 36149, June 6, 2016]

§ 250.194 How must I protect archaeological resources?

(a)-(b) [Reserved]

(c) If you discover any archaeological resource while conducting operations in the lease or right-of-way area, you must immediately halt operations within the area of the discovery and report the discovery to the BSEE Regional Director. If investigations determine that the resource is significant, the Regional Director will tell you how to protect it.

§ 250.195 What notification does BSEE require on the production status of wells?

You must notify the appropriate BSEE District Manager when you successfully complete or recomplete a well for production. You must:

(a) Notify the District Manager within 5 working days of placing the well in a production status. You must confirm oral notification by telefax or e-mail within those 5 working days.

(b) Provide the following information in your notification:

(1) Lessee or operator name;

(2) Well number, lease number, and OCS area and block designations;

(3) Date you placed the well on production (indicate whether or not this is first production on the lease);

(4) Type of production; and

(5) Measured depth of the production interval.

§ 250.196 Reimbursements for reproduction and processing costs.

(a) BSEE will reimburse you for costs of reproducing data and information that the Regional Director requests if:

(1) You deliver geophysical and geological (G&G) data and information to BSEE for the Regional Director to inspect or select and retain;

(2) BSEE receives your request for reimbursement and the Regional Director determines that the requested reimbursement is proper; and

(3) The cost is at your lowest rate or at the lowest commercial rate established in the area, whichever is less.

(b) BSEE will reimburse you for the costs of processing geophysical information (that does not include cost of data acquisition):

(1) If, at the request of the Regional Director, you processed the geophysical data or information in a form or manner other than that used in the normal conduct of business; or

(2) If you collected the information under a permit that BSEE issued to you before October 1, 1985, and the Regional Director requests and retains the information.

(c) When you request reimbursement, you must identify reproduction and processing costs separately from acquisition costs.

(d) BSEE will not reimburse you for data acquisition costs or for the costs of analyzing or processing geological information or interpreting geological or geophysical information.

§ 250.197 Data and information to be made available to the public or for limited inspection.

BSEE will protect data and information that you submit under this part, and 30 CFR part 203, as described in this section. Paragraphs (a) and (b) of this section describe what data and information will be made available to the public without the consent of the lessee, under what circumstances, and in what time period. Paragraph (c) of this section describes what data and information will be made available for limited inspection without the consent of the lessee, and under what circumstances.

(a) All data and information you submit on BSEE forms will be made available to the public upon submission, except as specified in the following table:

On form . . . | Data and information not immediately available are . . . | Excepted data will be made available . . .

(1) BSEE-0123, Application for Permit to Drill, | Items 15, 16, 22 through 25, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier.

(2) BSEE-0123S, Supplemental APD Information Sheet, | Items 3, 7, 8, 15 and 17, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier.

(3) BSEE-0124, Application for Permit to Modify, | Item 17, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier.

(4) BSEE-0125, End of Operations Report, | Items 12, 13, 17, 21, 22, 26 through 38, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier. However, items 33 through 38 will not be released when the well goes on production unless the period of time in the table in paragraph (b) has expired.

(5) BSEE-0126, Well Potential Test Report, | Item 101, | 2 years after you submit it.

(6) [Reserved]

(7) BSEE-0133 Well Activity Report, | Item 10 Fields [WELLBORE START DATE, TD DATE, OP STATUS, END DATE, MD, TVD, AND MW PPG]. Item 11 Fields [WELLBORE START DATE, TD DATE, PLUGBACK DATE, FINAL MD, AND FINAL TVD] and Items 12 through 15, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier.

(8) BSEE-0133S Open Hole Data Report, | Boxes 7 and 8, | When the well goes on production or according to the table in paragraph (b) of this section, whichever is earlier.

(9) [Reserved]

(10) [Reserved]

(b) BSEE will release lease and permit data and information that you submit and BSEE retains, but that are not normally submitted on BSEE forms, according to the following table:

If . . . | BSEE will release . . . | At this time . . . | Special provisions . . .

(1) The Director determines that data and information are needed for specific scientific or research purposes for the Government, | Geophysical data, Geological data Interpreted G&G information, Processed G&G information, Analyzed geological information, | At any time, | BSEE will release data and information only if release would further the National interest without unduly damaging the competitive position of the lessee.

(2) Data or information is collected with high-resolution systems (e.g., bathymetry, side-scan sonar, subbottom profiler, and magnetometer) to comply with safety or environmental protection requirements, | Geophysical data, Geological data, Interpreted G&G information, Processed geological information, Analyzed geological information, | 60 days after BSEE receives the data or information, if the Regional Supervisor deems it necessary, | BSEE will release the data and information earlier than 60 days if the Regional Supervisor determines it is needed by affected States to make decisions under 30 CFR 550, subpart B. The Regional Supervisor will reconsider earlier release if you satisfy him/her that it would unduly damage your competitive position.

(3) Your lease is no longer in effect, | Geophysical data, Geological data, Processed G&G information Interpreted G&G information, Analyzed geological information, | When your lease terminates, | This release time applies only if the provisions in this table governing high-resolution systems and the provisions in 30 CFR 552.7 do not apply. The release time applies to the geophysical data and information only if acquired postlease for a lessee's exclusive use.

(4) Your lease is still in effect, | Geophysical data, Processed geophysical information, Interpreted G&G information, | 10 years after you submit the data and information, | This release time applies only if the provisions in this table governing high-resolution systems and the provisions in 30 CFR 552.7 do not apply. This release time applies to the geophysical data and information only if acquired postlease for a lessee's exclusive use.

(5) Your lease is still in effect and within the primary term specified in the lease, | Geological data, Analyzed geological information, | 2 years after the required submittal date or 60 days after a lease sale if any portion of an offered lease is within 50 miles of a well, whichever is later, | These release times apply only if the provisions in this table governing high-resolution systems and the provisions in 30 CFR 552.7 do not apply. If the primary term specified in the lease is extended under the heading of “Suspensions” in this subpart, the extension applies to this provision.

(6) Your lease is in effect and beyond the primary term specified in the lease, | Geological data, Analyzed geological information, | 2 years after the required submittal date, | None.

(7) Data or information is submitted on well operations, | Descriptions of downhole locations, operations, and equipment, | When the well goes on production or when geological data is released according to §§ 250.197(b)(5) and (b)(6), whichever occurs earlier, | Directional survey data may be released earlier to the owner of an adjacent lease according to subpart D of this part.

(8) Data and information are obtained from beneath unleased land as a result of a well deviation that has not been approved by the District Manager or Regional Supervisor, | Any data or information obtained, | At any time, | None.

(9) Except for high-resolution data and information released under paragraph (b)(2) of this section data and information acquired by a permit under 30 CFR part 551 are submitted by a lessee under 30 CFR part 203, 30 CFR part 250, or 30 CFR part 550, | G&G data, analyzed geological information, processed and interpreted G&G information, | Geological data and information: 10 years after BOEM issues the permit; Geophysical data: 50 years after BOEM issues the permit; Geophysical information: 25 years after BOEM issues the permit, | None.

(c) BSEE may allow limited inspection, but only by persons with a direct interest in related BSEE decisions and issues in specific geographic areas, and who agree in writing to its confidentiality, of G&G data and information submitted under this part or 30 CFR part 203 that BSEE uses to:

(1) Make unitization determinations on two or more leases;

(2) Make competitive reservoir determinations;

(3) Ensure proper plans of development for competitive reservoirs;

(4) Promote operational safety;

(5) Protect the environment;

(6) [Reserved]; or

(7) Determine eligibility for royalty relief.

80 References
§ 250.198 Documents incorporated by reference.

Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. All approved incorporation by reference (IBR) material is available for inspection at BSEE and at the National Archives and Records Administration (NARA). Contact BSEE at: the Houston BSEE office at 1919 Smith Street Suite 14042, Houston, Texas 77002; 1-844-259-4779; or at regs@bsee.gov. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email: fr.inspection@nara.gov. The material may be obtained from the following sources:

(a) American Concrete Institute (ACI), ACI Standards, 38800 Country Club Drive, Farmington Hills, MI 48331-3439: phone: 248-848-3700; website: www.concrete.org:

(1) ACI Standard 318-95, Building Code Requirements for Reinforced Concrete, 1995; into § 250.901.

(2) ACI 318R-95, Commentary on Building Code Requirements for Reinforced Concrete, 1995; into § 250.901.

(3) ACI 357R-84, Guide for the Design and Construction of Fixed Offshore Concrete Structures, 1984; reapproved 1997, into § 250.901.

(b) American Gas Association (AGA Reports), 400 North Capitol Street NW, Suite 450, Washington, DC 20001; phone: 202-824-7000; website: www.aga.org.

(1) AGA Report No. 7, Measurement of Natural Gas by Turbine Meters, Revised February 2006; into § 250.1203(b).

(2) AGA Report No. 8, Part 1, Thermodynamic Properties of Natural Gas and Related Gases Detail and Gross Equations of State, Third Edition, April 2017; into § 250.1203(b).

(3) AGA Report No. 8, Part 2, Thermodynamic Properties of Natural Gas and Related Gases, GERG-2008 Equation of State, First Edition, April 2017; into § 250.1203(b).

(4) AGA Report No. 9, Measurement of Gas by Multipath Ultrasonic Meters; Fourth Edition, 2022; into § 250.1203(b).

(5) AGA Report No. 10, Speed of Sound in Natural Gas and Other Related Hydrocarbon Gases, Copyright 2003; into § 250.1203(b).

(6) AGA Report No. 11, Measurement of Natural Gas by Coriolis Meter, Second Edition, February 2013; into § 250.1203(b).

(c) American Institute of Steel Construction, Inc. (AISC), AISC Standards, One East Wacker Drive, Suite 700, Chicago, IL 60601-1802; phone: 312-670-2400; website: www.aisc.org.

(1) ANSI/AISC 360-05, Specification for Structural Steel Buildings; into § 250.901.

(2) [Reserved]

(d) American National Standards Institute (ANSI), 25 West 43rd Street, Fourth Floor, New York, NY 10036-7417; phone: 212-642-4980; email: info@ansi.org; website: www./webstore.ansi.org/:

(1) ANSI/ASME B16.5-2003, Pipe Flanges and Flanged Fittings; into § 250.1002.

(2) ANSI/ASME B31.8-2003, Gas Transmission and Distribution Piping Systems; into § 250.1002.

(3) ANSI Z88.2-1992, American National Standard for Respiratory Protection; into § 250.490.

(e) American Petroleum Institute (API), 200 Massachusetts Avenue NW, Suite 1100, Washington, DC 20001-5571; phone: 202-682-8000; website: www.api.org.

(1) Manual of Petroleum Measurement Standards (MPMS)—(i) Chapter 1. (A) API MPMS Chapter 1, Vocabulary, Second Edition, July 1994; into § 250.1201.

(B) [Reserved]

(ii) Chapter 2. (A) API MPMS Chapter 2—Tank Calibration, Section 2A—Measurement and Calibration of Upright Cylindrical Tanks by the Manual Tank Strapping Method, First Edition February 1995, reaffirmed August 2017; into § 250.1202(a) and (l).

(B) API MPMS Chapter 2—Tank Calibration, Section 2B—Calibration of Upright Cylindrical Tanks Using the Optical Reference Line Method, First Edition, March 1989, reaffirmed April 2019 (including Addendum 1, October 2019); into § 250.1202(a) and (l).

(iii) Chapter 3. (A) API MPMS Chapter 3.1A, Standard Practice for the Manual Gauging of Petroleum and Petroleum Products, Third Edition, August 2013, Errata 1, January 2021; into § 250.1202(a) and (l).

(B) API MPMS Chapter 3—Tank Gauging, Section 1B—Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging, Second Edition, June 2001, reaffirmed February 2016; into § 250.1202(a) and (l).

(iv) Chapter 4. (A) API MPMS Chapter 4—Proving Systems, Section 1—Introduction, Third Edition, February 2005, reaffirmed June 2014; into § 250.1202(a).

(B) API MPMS Chapter 4—Proving Systems, Section 2—Displacement Provers, Third Edition, September 2003; Addendum February 2015, Reaffirmed December 2022; into § 250.1202(a).

(C) API MPMS Chapter 4—Proving Systems, Section 4—Tank Provers, Second Edition May 1998, reaffirmed May 2015; into § 250.1202(a) and (f).

(D) API MPMS Chapter 4.5, Master Meter Provers, Fourth Edition, June 2016; into § 250.1202(a).

(E) API MPMS Chapter 4—Proving Systems, Section 6—Pulse Interpolation, Second Edition, May 1999; Errata April 2007; reaffirmed October 2013; into § 250.1202(a) and (h).

(F) API MPMS Chapter 4—Proving Systems, Section 7—Field Standard Test Measures, Third Edition, April 2009, reaffirmed June 2014; into § 250.1202(a).

(G) API MPMS Chapter 4.8, Operation of Proving Systems, Third Edition, July 2021; into § 250.1202(a), (f), and (g).

(H) API MPMS Chapter 4—Proving Systems, Section 9—Methods of Calibration for Displacement and Volumetric Tank Provers, Part 2—Determination of the Volume of Displacement and Tank Provers by the Water-draw Method of Calibration, First Edition, December 2005, reaffirmed July 2015; into § 250.1202(a).

(v) Chapter 5. (A) API MPMS Chapter 5—Metering, Section 1—General Considerations for Measurement by Meters, Fourth Edition, September 2005, Errata 1 June 2008, Errata 2 June 2011, reaffirmed December 2022; into § 250.1202(a).

(B) API MPMS Chapter 5—Metering, Section 2—Measurement of Liquid Hydrocarbons by Displacement Meters, Third Edition, September 2005, reaffirmed July 2015; into § 250.1202(a).

(C) API MPMS Chapter 5—Metering, Section 3—Measurement of Liquid Hydrocarbons by Turbine Meters, Fifth Edition, September 2005, reaffirmed August 2014; into § 250.1202(a).

(D) API MPMS Chapter 5—Metering, Section 4—Accessory Equipment for Liquid Meters, Fourth Edition, September 2005, Errata May 2015, reaffirmed August 2015; into § 250.1202(a).

(E) API MPMS Chapter 5—Metering, Section 5—Fidelity and Security of Flow Measurement Pulsed-Data Transmission Systems, Second Edition, August 2005, reaffirmed August 2015; into § 250.1202(a).

(F) API MPMS Chapter 5—Metering, Section 6—Measurement of Liquid Hydrocarbons by Coriolis Meters; First Edition, October 2002, reaffirmed November 2013; into § 250.1202(a).

(G) API MPMS Chapter 5.8, Measurement of Liquid Hydrocarbons by Ultrasonic Flow Meters, Second Edition, November 2011, Errata February 2014, reaffirmed May 2017; into § 250.1202(a).

(vi) Chapter 6. (A) API MPMS Chapter 6.1, Lease Automatic Custody Transfer (LACT) Systems, Second Edition, May 1991; Addendum 1 August 2020; into § 250.1202(a).

(B) API MPMS Chapter 6—Metering Assemblies, Section 6—Pipeline Metering Systems, Second Edition, May 1991, reaffirmed December 2017; into § 250.1202(a).

(C) API MPMS Chapter 6—Metering Assemblies, Section 7—Metering Viscous Hydrocarbons, Second Edition, May 1991, reaffirmed March 2018; into § 250.1202(a).

(vii) Chapter 7. (A) API MPMS Chapter 7.1, Temperature Determination-Liquid-in-Glass Thermometers, Second Edition, August 2017; into § 250.1202(a).

(B) API MPMS Chapter 7.3, Temperature Determination—Temperature Determination—Fixed Automatic Tank Temperature Systems, Second Edition, October 2011; reaffirmed September 2021 into § 250.1202(a).

(viii) Chapter 8. (A) API MPMS Chapter 8.1, Standard Practice for Manual Sampling of Petroleum and Petroleum Products, Sixth Edition, September 2022; into § 250.1202(a) and (k).

(B) API MPMS Chapter 8.2, Standard Practice for Automatic Sampling of Liquid Petroleum and Petroleum Products, Sixth Edition, September 2022; into § 250.1202(a), (b), and (k).

(C) API MPMS Chapter 8.3, Standard Practice for Mixing and Handling of Liquid Samples of Petroleum and Petroleum Products, Second Edition, September 2019; into § 250.1202(a).

(ix) Chapter 9. (A) API MPMS Chapter 9.1, Standard Test Method for Density, Relative Density, or API Gravity of Crude Petroleum and Liquid Petroleum Products by Hydrometer Method, Third Edition, December 2012, reaffirmed May 2017; into § 250.1202(a).

(B) API MPMS Chapter 9.2, Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure Hydrometer, Fourth Edition, November 2022; into § 250.1202(a).

(C) API MPMS Chapter 9.4, Continuous Density Measurement Under Dynamic (Flowing) Conditions, First Edition, January 2018; into § 250.1202(a).

(x) Chapter 10. (A) API MPMS Chapter 10—Sediment and Water, Section 1—Standard Test Method for Sediment in Crude Oils and Fuel Oils by the Extraction Method, Third Edition, November 2007; reaffirmed October 2012; into § 250.1202(a);

(B) API MPMS Chapter 10.2, Standard Test Method for Water in Crude Oil by Distillation, Fifth Edition, December 2022; into § 250.1202(a).

(C) API MPMS Chapter 10.3, Standard Test Method for Water and Sediment in Crude Oil by the Centrifuge Method (Laboratory Procedure), Fifth Edition, December 2022; into § 250.1202(a).

(D) API MPMS Chapter 10.4, Determination of Water and/or Sediment in Crude Oil by the Centrifuge Method (Field Procedure), Fifth Edition, August 2020; into § 250.1202(a).

(E) API MPMS Chapter 10.9, Standard Test Method for Water in Crude Oils by Coulometric Karl Fisher Titration, Third Edition, May 2013, reaffirmed June 2018; into § 250.1202(a).

(xi) Chapter 11. (A) API MPMS Chapter 11.1—Volume Correction Factors, Volume 1, Table 5A—Generalized Crude Oils and JP-4 Correction of Observed API Gravity to API Gravity at 60 °F, and Table 6A—Generalized Crude Oils and JP-4 Correction of Volume to 60 °F Against API Gravity at 60 °F, API Standard 2540, First Edition, August 1980; reaffirmed March 1997; into § 250.1202(a).

(B) API MPMS Chapter 11—Physical Properties Data, Section 1—Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils, May 2004, Addendum 1 September 2007, Addendum 2 May 2019; into § 250.1202(a), (g), and (l).

(C) API MPMS Chapter 11.2.2—Compressibility Factors for Hydrocarbons: 0.350-0.637 Relative Density (60 °F/60 °F) and −50 °F to 140 °F Metering Temperature, Second Edition, October 1986; reaffirmed: December 2007; into § 250.1202(a).

(D) API MPMS Chapter 11—Physical Properties Data, Addendum to Section 2, Part 2—Compressibility Factors for Hydrocarbons, Correlation of Vapor Pressure for Commercial Natural Gas Liquids, First Edition, December 1994; reaffirmed December 2002; into § 250.1202(a).

(xii) Chapter 12. (A) API MPMS Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 1—Introduction, Second Edition, May 1995; reaffirmed March 2014; into § 250.1202(a).

(B) API MPMS Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 2—Measurement Tickets, Third Edition, June 2003; reaffirmed February 2016; into § 250.1202(a).

(C) API MPMS Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 3—Proving Report; First Edition, October 1998, reaffirmed March 2014; into § 250.1202(a) and (g).

(D) API MPMS Chapter 12—Calculation of Petroleum Quantities, Section 2—Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Part 4—Calculation of Base Prover Volumes by the Waterdraw Method, First Edition, December 1997; reaffirmed September 2014; into § 250.1202(a), (f), and (g).

(E) API MPMS Chapter 12.2, Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors, Second Edition, July 2021; into § 250.1202(a).

(xiii) Chapter 14. (A) API MPMS Chapter 14.1, Collecting and Handling of Natural Gas Samples for Analysis by Gas Chromatography, Eighth Edition, September 2022; into § 250.1203(b).

(B) API MPMS Chapter 14.3.1—Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids—Concentric, Square-edged Orifice Meters, Part 1: General Equations and Uncertainty Guidelines, Fourth Edition September 2012, Errata July 2013, Reaffirmed September 2017; into § 250.1203(b).

(C) API MPMS Chapter 14.3.2, Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids—Concentric, Square-edged Orifice Meters, Part 2: Specification and Installation Requirements, Fifth Edition, March 2016, Errata 1 March 2017, Errata 2 January 2019; into § 250.1203(b).

(D) API MPMS 14.3.3, Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids—Concentric, Square-edged Orifice Meters, Part 3: Natural Gas Applications, Fourth Edition November 2013, Reaffirmed June 2021; into § 250.1203(b).

(E) API MPMS, Chapter 14.5/GPA Standard 2172-09; Calculation of Gross Heating Value, Relative Density, Compressibility and Theoretical Hydrocarbon Liquid Content for Natural Gas Mixtures for Custody Transfer; Third Edition, January 2009; reaffirmed February 2014; into § 250.1203(b).

(F) API MPMS Chapter 14—Natural Gas Fluids Measurement, Section 8—Liquefied Petroleum Gas Measurement, Second Edition, July 1997; reaffirmed, March 2006; into § 250.1203(b).

(xiv) Chapter 20. (A) API MPMS Chapter 20—Allocation Measurement, Section 1—Allocation Measurement, First Edition, September 1993, Addendum 1 January 2013, Addendum 2 November 2016, Addendum 3 December 2017, Reaffirmed June 2024; into §§ 250.1202(a); 250.1203(b).

(B) API MPMS Chapter 20.3, Measurement of Multiphase Flow, First Edition, January 2013; reaffirmed, October 2018; into § 250.1203(b).

(C) API MPMS Chapter 20.5, Recommended Practice for Application of Production Well Testing in Measurement and Allocation, First Edition, December 2017; Errata 1, August 2023; into § 250.1204(b).

(xv) Chapter 21. (A) API MPMS Chapter 21—Flow Measurement Using Electronic Metering Systems, Section 1—Electronic Gas Measurement, First Edition, August 1993; reaffirmed, July 2005; into § 250.1203(b).

(B) API MPMS Chapter 21—Flow Measurement Using Electronic Metering Systems, Section 2—Electronic Liquid Volume Measurement Using Positive Displacement and Turbine Meters; First Edition, June 1998; reaffirmed October 2016; into § 250.1202(a).

(C) API MPMS Chapter 21—Flow Measurement Using Electronic Metering Systems, Addendum to Section 2—Flow Measurement Using Electronic Metering Systems, Inferred Mass; First Edition, reaffirmed February 2006; into § 250.1202(a).

(2) Recommended Practices, Specifications, and Standards—(i) 1-99. (A) API Recommended Practice 2A-WSD, Planning, Designing and Constructing Fixed Offshore Platforms—Working Stress Design, Twenty-second Edition, November 2014, reaffirmed September 2020; into §§ 250.901(a) and (d); 250.908(a); 250.920(f).

(B) API Specification 2C, Specification for Offshore Pedestal Mounted Cranes, Sixth Edition, March 2004; into § 250.108.

(C) API Recommended Practice 2D, Operation and Maintenance of Offshore Cranes, Sixth Edition, May 2007; into § 250.108.

(D) API Recommended Practice 2FPS, Planning, Designing, and Constructing Floating Production Systems, Second Edition, October 2011, Reaffirmed September 2020; into § 250.901(a) and (d).

(E) API Recommended Practice 2FSIM, Floating Systems Integrity Management, First Edition, September 2019; into § 250.901(a) and (d).

(F) ANSI/API Recommended Practice 2GEO, Geotechnical and Foundation Design Considerations, First Edition April 2011, Addendum 1 October 2014, Reaffirmed January 2021; into § 250.901(a) and (d).

(G) API Recommended Practice 2I, In-Service Inspection of Mooring Hardware for Floating Structures; Third Edition, April 2008; into § 250.901(a) and (d).

(H) ANSI/API Recommended Practice 2MET, Derivation of Metocean Design and Operating Conditions; Second Edition, January 2021; into § 250.901(a) and (d).

(I) API Recommended Practice 2MIM, Mooring Integrity Management; First Edition, September 2019; into § 250.901(a) and (d).

(J) ANSI/API Recommended Practice 2N, Planning, Designing, and Constructing Structures and Pipelines for Arctic Conditions, Third Edition, April 2015; into § 250.470(g).

(K) API Recommended Practice 2RD, Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms (TLPs), First Edition, June 1998; reaffirmed, May 2006; Errata, June 2009; into §§ 250.733; 250.800(c); 250.901(a) and (d); 250.1002(b).

(L) API Recommended Practice 2RIM, Integrity Management of Risers from Floating Production Systems; First Edition, September 2019; into § 250.901(a) and (d).

(M) API Recommended Practice 2SIM, Structural Integrity Management of Fixed Offshore Structures, First Edition November 2014; reaffirmed September 2020; into §§ 250.901(a) and (d); 250.919(b) and (d); 250.920.

(N) API Recommended Practice 2SK, Design and Analysis of Stationkeeping Systems for Floating Structures, Third Edition October 2005, Addendum May 2008, reaffirmed June 2015; into §§ 250.800(c); 250.901(a) and (d).

(O) API Recommended Practice 2SM, Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring, Second Edition, July 2014; Reaffirmation, September 2020; into §§ 250.800(c); 250.901(a) and (d).

(P) API Recommended Practice 2T, Planning, Designing, and Constructing Tension Leg Platforms, Third Edition, July 2010, reaffirmed June 2015; into § 250.901(a) and (d).

(Q) API Specification 6A, Specification for Wellhead and Christmas Tree Equipment, Twenty-First Edition November 2018, Errata 1 April 2019, Errata 2 June 2020, Errata 3 September 2020, Errata 4 September 2021, Addendum 1, July 2020, Addendum 2, June 2021, Addendum 3, August 2022; into §§ 250.518(c); 250.619(c); 250.730(a); 250.802(a); 250.803(a); 250.833; 250.873(b); 250.874(g); 250.1002(b).

(R) API Standard 6AV1, Validation of Safety and Shutdown Valves for Sandy Service, Third Edition, July 2018; into §§ 250.802(a) and (c); 250.833; 250.873(b); 250.874(g).

(S) API Standard 6AV2, Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety Valves Offshore; First Edition March 2014; Errata 1 August 2014; into §§ 250.820; 250.834; 250.836; 250.880(c).

(T) API Specification 6D, Specification for Valves, Twenty-fifth Edition November 2021, Errata 1 December 2021, Errata 2 April 2022, Addendum 1 April 2023; into § 250.1002(b).

(U) ANSI/API Specification 11D1, Packers and Bridge Plugs, Third Edition, April 2015; Errata 1, August 2019; into §§ 250.518(e); 250.619(e); 250.1703.

(V) ANSI/API Specification 14A, Specification for Subsurface Safety Valve Equipment, Eleventh Edition, October 2005, reaffirmed June 2012; into §§ 250.802; 250.803(a).

(W) ANSI/API Recommended Practice 14B, Design, Installation, Operation, Test, and Redress of Subsurface Safety Valve Systems, Sixth Edition, September 2015; into §§ 250.802(b); 250.803(a); 250.814(d); 250.828(c); 250.880(c).

(X) API Recommended Practice 14C, Analysis, Design, Installation, and Testing of Basic Surface Safety Systems for Offshore Production Platforms, Seventh Edition, March 2001, reaffirmed: March 2007; into §§ 250.125(a); 250.841(a); 250.842(a); 250.850; 250.852(a); 250.855, 250.856(a); 250.858(a); 250.862(e); 250.865(a); 250.867(a); 250.869(a) through (c); 250.872(a); 250.873(a); 250.874(a); 250.880(b) and (c); 250.1002(d); 250.1004(b).

(Y) API Recommended Practice 14E, Design and Installation of Offshore Production Platform Piping Systems, Fifth Edition, October 1991; reaffirmed, January 2013; into §§ 250.841(b); 250.842(a).

(Z) API Recommended Practice 14F, Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class 1, Division 1 and Division 2 Locations, Upstream Segment, Fifth Edition, July 2008, reaffirmed: April 2013; into §§ 250.114(c); 250.842(c); 250.862(e).

(AA) API Recommended Practice 14FZ, Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Zone 0, Zone 1 and Zone 2 Locations, Second Edition, May 2013; into §§ 250.114(c); 250.842(c); 250.862(e).

(BB) API Recommended Practice 14G, Fire Prevention and Control on Fixed Open-type Offshore Production Platforms, Fourth Edition, April 2007; Reaffirmed, January 2013; into §§ 250.859(a); 250.862(e); 250.880(c).

(CC) API Recommended Practice 14J, Design and Hazards Analysis for Offshore Production Facilities, Second Edition, May 2001; reaffirmed: January 2013; into §§ 250.800(b) and (c); 250.842(c); 250.901(a) and (d).

(DD) ANSI/API Specification 16A, Specification for Drill-through Equipment, Third Edition June 2004, reaffirmed August 2010; into § 250.730.

(EE) ANSI/API Specification 16C, Specification for Choke and Kill Systems, First Edition, January 1993, reaffirmed July 2010; into § 250.730.

(FF) API Specification 16D, Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment, Second Edition, July 2004, reaffirmed August 2013; into § 250.730.

(GG) API Specification 17D, Specification for Subsea Wellhead and Tree Equipment, Third Edition, October 2021, Errata 1, December 2021, Addendum 1, December 2022; into §§ 250.518(c); 250.619(c); 250.730(a).

(HH) API Recommended Practice 17H, Remotely Operated Tools and Interfaces on Subsea Production Systems, Second Edition, June 2013; Errata, January 2014; into § 250.734(a).

(II) API Specification 17J, Specification for Unbonded Flexible Pipe, Fourth Edition, May 2014, Errata 1 September 2016, Errata 2 May 2017, Addendum 1 October 2017, reaffirmed March 2021; into §§ 250.852(e); 250.1002(b); 250.1007(a).

(JJ) API Specification 20E, Alloy and Carbon Steel Bolting for Use in the Petroleum and Natural Gas Industries, Second Edition, February 2017, Addendum 1 September 2018, Addendum 2 March 2019, Errata 1 November 2021, Errata 2 May 2022; into § 250.730(a).

(KK) API Specification 20F, Corrosion-resistant Bolting for Use in the Petroleum and Natural Gas Industries; Second Edition, May 2018, Errata 1 October 2020, Addendum 1 November 2021; into § 250.730(a).

(LL) API Standard 53, Well Control Equipment Systems for Drilling Wells, Fifth Edition, December 2018; into §§ 250.730(a); 250.734(a); 250.735(a); 250.736(d); 250.737(d); 250.739(a).

(MM) API Recommended Practice 65, Recommended Practice for Cementing Shallow Water Flow Zones in Deepwater Wells, First Edition, September 2002; into § 250.415.

(NN) API Standard 65—Part 2, Isolating Potential Flow Zones During Well Construction; Second Edition, December 2010; into §§ 250.415(f); 250.420(a).

(OO) API Recommended Practice 75, Recommended Practice for Development of a Safety and Environmental Management Program for Offshore Operations and Facilities, Third Edition, May 2004, reaffirmed May 2008; into §§ 250.1900; 250.1902; 250.1903; 250.1909; 250.1920.

(PP) API Recommended Practice 90, Annular Casing Pressure Management for Offshore Wells, First Edition, August 2006; into § 250.519.

(ii) 500-599. (A) API Recommended Practice 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, Third Edition, December 2012; Errata January 2014, into §§ 250.114(a); 250.459; 250.842(a); 250.862(a) and (e); 250.872(a).

(B) API Recommended Practice 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2, First Edition, November 1997; reaffirmed, August 2013; into §§ 250.114(a); 250.459; 250.842(a); 250.862(a) and (e); 250.872(a).

(C) API 510, Pressure Vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration, Tenth Edition, May 2014, Addendum 1, May 2017; into § 250.851(a).

(D) API 570, Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems, Fourth Edition, February 2016, Addendum 1, May 2017; into § 250.841(b).

(iii) 2500-2599. (A) API Standard 2555, Method for Liquid Calibration of Tanks, First Edition, September 1966, reaffirmed May 2014; into § 250.1202(a).

(B) API Recommended Practice 2556, Recommended Practice for Correcting Gauge Tables for Incrustation, Second Edition, August 1993, reaffirmed November 2013; into § 250.1202(a).

(iv) A-Q. (A) ANSI/API Specification Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry, Ninth Edition, June 2013; Errata, February 2014; Errata 2, March 2014; Addendum 1, June 2016; into §§ 250.730; 250.801(b) and (c);

(B) [Reserved]

(v) Bulletins. (A) API Bulletin 92L, Drilling Ahead Safely with Lost Circulation in the Gulf of Mexico, First Edition, August 2015; into § 250.427(b).

(B) [Reserved]

(f) American Society of Mechanical Engineers (ASME), 22 Law Drive, P.O. Box 2900, Fairfield, NJ 07007-2900; phone: 1-800-843-2763; website: www.asme.org:

(1) 2017 ASME Boiler and Pressure Vessel Code, Section I, Rules for Construction of Power Boilers, 2017 Edition, July 1, 2017; into § 250.851(a).

(2) 2017 ASME Boiler and Pressure Vessel Code, Section IV, Rules for Construction of Heating Boilers, 2017 Edition, July 1, 2017; into § 250.851(a).

(3) ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Rules for Construction of Pressure Vessels; into § 250.851(a)—as follows:

(i) ASME BPVC.VIII.1-2021, Division 1, 2021 Edition, July 1, 2021.

(ii) 2017 ASME BPVC, Division 2: Alternative Rules, 2017 Edition, July 1, 2017.

(iii) 2017 ASME BPVC, Division 3: Alternative Rules for Construction of High Pressure Vessels, 2017 Edition, July 1, 2017.

(g) ASTM, International (ASTM), 100 Bar Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; phone: 1-877-909-2786; website: www.astm.org:

(1) ASTM C33-07, approved December 15, 2007, Standard Specification for Concrete Aggregates; into § 250.901.

(2) ASTM C94/C 94M-07, approved January 1, 2007, Standard Specification for Ready-Mixed Concrete; into § 250.901.

(3) ASTM C150-07, approved May 1, 2007, Standard Specification for Portland Cement; into § 250.901.

(4) ASTM C330-05, approved December 15, 2005, Standard Specification for Lightweight Aggregates for Structural Concrete; into § 250.901.

(5) ASTM C595-08, approved January 1, 2008, Standard Specification for Blended Hydraulic Cements; into § 250.901.

(h) American Welding Society (AWS), AWS Codes, 8669 NW 36 Street, #130, Miami, FL 33126; phone: 800-443-9353; website: www.aws.org:

(1) AWS D1.1:2000, Structural Welding Code—Steel, 17th Edition, October 18, 1999; into § 250.901.

(2) AWS D1.4-98, Structural Welding Code—Reinforcing Steel, 1998 Edition; into § 250.901.

(3) AWS D3.6M:1999, Specification for Underwater Welding (1999); into § 250.901.

(i) Center for Offshore Safety (COS), 1990 Post Oak Blvd., Suite 1370, Houston, TX 77056; phone: 832-495-4925; website: www.centerforoffshoresafety.org:

(1) COS Safety Publication COS-2-01, Qualification and Competence Requirements for Audit Teams and Auditors Performing Third-party SEMS Audits of Deepwater Operations, First

Edition, Effective Date October 2012; into §§ 250.1900; 250.1903; 250.1904; 250.1921.

(2) COS Safety Publication COS-2-03, Requirements for Third-party SEMS Auditing and Certification of Deepwater Operations, First Edition, Effective Date October 2012; into §§ 250.1900; 250.1903; 250.1904; 250.1920.

(3) COS Safety Publication COS-2-04, Requirements for Accreditation of Audit Service Providers Performing SEMS Audits and Certification of Deepwater Operations, First Edition, Effective Date October 2012; into §§ 250.1900; 250.1903; 250.1904; 250.1922.

(j) GPA Midstream Association, 6060 S American Plaza St E, Suite 700, Tulsa, Oklahoma 74135; phone: (918) 493-3872. fax: (918) 493-3875; email: news@GPAmidstream.org:

(1) GPA Midstream Standard 2198-16 (GPA Standard 2198-16), Selection, Preparation, Validation, Care and Storage of Natural Gas and Natural Gas Liquids Reference Standard Blends, Revised August 2016; into § 250.1203(b).

(2) GPA Midstream Standard 2261-20 (GPA Standard 2261-20), Analysis for Natural Gas and Similar Gaseous Mixtures by Gas Chromatography, Copyright 2019; into § 250.1203(b).

(3) GPA Standard 2286-14, Method for the Extended Analysis of Natural Gas and Similar Gaseous Mixtures by Temperature Program Gas Chromatography, Revised 2014; into § 250.1203(b).

(k) International Organization for Standardization (ISO), 1, ch. de la Voie-Creuse, CP 56, CH-1211, Geneva 20, Switzerland; phone: 41-22-749-01-11; website: www.iso.org:

(1) ISO/IEC 17011:2017(E), Conformity assessment—Requirements for accreditation bodies accrediting conformity assessment bodies, Second Edition 2017-11 (ISO/IEC 17011); into §§ 250.1900(a); 250.1903; 250.1904(d); 250.1922.

(2) ISO/IEC 17021-1, Conformity assessment—Requirements for bodies providing audit and certification of management systems—Part 1: Requirements, First Edition, June 2015; into § 250.730(d).

(l) National Association of Corrosion Engineers (NACE) International, NACE Standards, Park Ten Place, Houston, TX 77084; phone: 281-228-6200; website: www.nace.org:

(1) NACE Standard MR0175-2003, Standard Material Requirements, Metals for Sulfide Stress Cracking and Stress Corrosion Cracking Resistance in Sour Oilfield Environments, Revised January 17, 2003; into §§ 250.490; 250.518(a); 250.619(a); 250.901.

(2) NACE Standard RP0176-2003, Standard Recommended Practice, Corrosion Control of Steel Fixed Offshore Structures Associated with Petroleum Production; into § 250.901.

[84 FR 21969, May 15, 2019, as amended at 85 FR 84236, Dec. 30, 2020; 89 FR 71111, Aug. 30, 2024; 91 FR 35347, June 10, 2026]

§ 250.199 Paperwork Reduction Act statements—information collection.

(a) OMB has approved the information collection requirements in part 250 under 44 U.S.C. 3501 et seq. The table in paragraph (e) of this section lists the subpart in the rule requiring the information and its title, provides the OMB control number, and summarizes the reasons for collecting the information and how BSEE uses the information. The associated BSEE forms required by this part are listed at the end of this table with the relevant information.

(b) Respondents are OCS oil, gas, and sulphur lessees and operators. The requirement to respond to the information collections in this part is mandated under the Act (43 U.S.C. 1331 et seq.) and the Act's Amendments of 1978 (43 U.S.C. 1801 et seq.). Some responses are also required to obtain or retain a benefit or may be voluntary. Proprietary information will be protected under § 250.197, Data and information to be made available to the public or for limited inspection; parts 30 CFR Parts 251, 252; and the Freedom of Information Act (5 U.S.C. 552) and its implementing regulations at 43 CFR part 2.

(c) The Paperwork Reduction Act of 1995 requires us to inform the public that an agency may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a currently valid OMB control number.

(d) Send comments regarding any aspect of the collections of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.

(e) BSEE is collecting this information for the reasons given in the following table:

30 CFR Subpart, title and/or BSEE Form (OMB Control No.) | BSEE collects this information and uses it to:

(1) Subpart A, General (1014-0022), including Forms BSEE-0011, iSEE; BSEE-0132, Evacuation Statistics; BSEE-0143, Facility/Equipment Damage Report; BSEE-1832, Notification of Incidents of Noncompliance | (i) Determine that activities on the OCS comply with statutory and regulatory requirements; are safe and protect the environment; and result in diligent development and production on OCS leases.

(ii) Support the unproved and proved reserve estimation, resource assessment, and fair market value determinations.

(iii) Assess damage and project any disruption of oil and gas production from the OCS after a major natural occurrence.

(2) Subpart B, Plans and Information (1014-0024) | Evaluate Deepwater Operations Plans for compliance with statutory and regulatory requirements

(3) Subpart C, Pollution Prevention and Control (1014-0023) | (i) Evaluate measures to prevent unauthorized discharge of pollutants into the offshore waters.

(ii) Ensure action is taken to control pollution.

(4) Subpart D, Oil and Gas and Drilling Operations (1014-0018), including Forms BSEE-0125, End of Operations Report; BSEE-0133, Well Activity Report; and BSEE-0133S, Open Hole Data Report | (i) Evaluate the equipment and procedures to be used in drilling operations on the OCS.

(ii) Ensure that drilling operations meet statutory and regulatory requirements.

(5) Subpart E, Oil and Gas Well-Completion Operations (1014-0004) | (i) Evaluate the equipment and procedures to be used in well-completion operations on the OCS.

(ii) Ensure that well-completion operations meet statutory and regulatory requirements.

(6) Subpart F, Oil and Gas Well Workover Operations (1014-0001) | (i) Evaluate the equipment and procedures to be used during well-workover operations on the OCS.

(ii) Ensure that well-workover operations meet statutory and regulatory requirements.

(7) Subpart G, Blowout Preventer Systems (1014-0028), including Form BSEE-0144, Rig Movement Notification Report | (i) Evaluate the equipment and procedures to be used during well drilling, completion, workover, and abandonment operations on the OCS.

(ii) Ensure that well operations meet statutory and regulatory requirements.

(8) Subpart H, Oil and Gas Production Safety Systems (1014-0003) | (i) Evaluate the equipment and procedures that will be used during production operations on the OCS.

(ii) Ensure that production operations meet statutory and regulatory requirements.

(9) Subpart I, Platforms and Structures (1014-0011) | (i) Evaluate the design, fabrication, and installation of platforms on the OCS.

(ii) Ensure the structural integrity of platforms installed on the OCS.

(10) Subpart J, Pipelines and Pipeline Rights-of-Way (1014-0016), including Form BSEE-0149, Assignment of Federal OCS Pipeline Right-of-Way Grant | (i) Evaluate the design, installation, and operation of pipelines on the OCS.

(ii) Ensure that pipeline operations meet statutory and regulatory requirements.

(11) Subpart K, Oil and Gas Production Rates (1014-0019), including Forms BSEE-0126, Well Potential Test Report and BSEE-0128, Semiannual Well Test Report | (i) Evaluate production rates for hydrocarbons produced on the OCS.

(ii) Ensure economic maximization of ultimate hydrocarbon recovery.

(12) Subpart L, Oil and Gas Production Measurement, Surface Commingling, and Security (1014-0002) | (i) Evaluate the measurement of production, commingling of hydrocarbons, and site security plans.

(ii) Ensure that produced hydrocarbons are measured and commingled to provide for accurate royalty payments and security.

(13) Subpart M, Unitization (1014-0015) | (i) Evaluate the unitization of leases.

(ii) Ensure that unitization prevents waste, conserves natural resources, and protects correlative rights.

(14) Subpart N, Remedies and Penalties | (The requirements in subpart N are exempt from the Paperwork Reduction Act of 1995 according to 5 CFR 1320.4).

(15) Subpart O, Well Control and Production Safety Training (1014-0008) | (i) Evaluate training program curricula for OCS workers, course schedules, and attendance.

(ii) Ensure that training programs are technically accurate and sufficient to meet statutory and regulatory requirements, and that workers are properly trained.

(16) Subpart P, Sulfur Operations (1014-0006) | (i) Evaluate sulfur exploration and development operations on the OCS.

(ii) Ensure that OCS sulfur operations meet statutory and regulatory requirements and will result in diligent development and production of sulfur leases.

(17) Subpart Q, Decommissioning Activities (1014-0010) | Ensure that decommissioning activities, site clearance, and platform or pipeline removal are properly performed to meet statutory and regulatory requirements and do not conflict with other users of the OCS.

(18) Subpart S, Safety and Environmental Management Systems (1014-0017), including Form BSEE-0131, Performance Measures Data | (i) Evaluate operators' policies and procedures to assure safety and environmental protection while conducting OCS operations (including those operations conducted by contractor and subcontractor personnel).

(ii) Evaluate Performance Measures Data relating to risk and number of accidents, injuries, and oil spills during OCS activities.

(19) Application for Permit to Drill (APD, Revised APD), Form BSEE-0123; and Supplemental APD Information Sheet, Form BSEE-0123S, and all supporting documentation (1014-0025) | (i) Evaluate and approve the adequacy of the equipment, materials, and/or procedures that the lessee or operator plans to use during drilling.

(ii) Ensure that applicable OCS operations meet statutory and regulatory requirements.

(20) Application for Permit to Modify (APM), Form BSEE-0124, and supporting documentation (1014-0026) | (i) Evaluate and approve the adequacy of the equipment, materials, and/or procedures that the lessee or operator plans to use during drilling and to evaluate well plan modifications and changes in major equipment.

(ii) Ensure that applicable OCS operations meet statutory and regulatory requirements.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26015, Apr. 29, 2016; 81 FR 36149, June 6, 2016]

Subpart B Plans and Information

Source: 89 FR 71112, Aug. 30, 2024, unless otherwise noted.

81 General Information
§ 250.200 Definitions.

Acronyms and terms used in this subpart have the following meanings:

(a) Acronyms used frequently in this subpart are listed alphabetically below:

(1) BOEM means Bureau of Ocean Energy Management of the U.S. Department of the Interior.

(2) BSEE means Bureau of Safety and Environmental Enforcement of the U.S. Department of the Interior.

(3) CID means Conservation Information Document.

(4) CZMA means Coastal Zone Management Act.

(5) DOCD means Development Operations Coordination Document.

(6) DPP means Development and Production Plan.

(7) DWOP means Deepwater Operations Plan.

(8) EIA means Environmental Impact Analysis.

(9) EP means Exploration Plan.

(10) ESA means Endangered Species Act.

(11) HPHT means High Pressure High Temperature

(12) I3P means Independent Third Party

(13) MMPA means Marine Mammal Protection Act.

(14) NPDES means National Pollutant Discharge Elimination System.

(15) NTL means Notice to Lessees and Operators.

(16) OCS means Outer Continental Shelf.

(b) Terms used in this subpart are listed alphabetically below:

Amendment means a change you make to an EP, DPP, or DOCD that is pending before BOEM for a decision (see 30 CFR 550.232(d) and 30 CFR 550.267(d)).

Barrier categorization includes identifying barriers as one of the following two types of categories:

Category 1 Barrier means any equipment, component, or assembly that functions as part of a primary barrier during any operational phase of its life cycle. The operational phases of the barrier equipment, component, or assembly are drilling, completion, workover, intervention, injection, production, or abandonment.

Category 2 Barrier means any equipment, component, or assembly that normally functions as part of a secondary barrier during any operational phase of its life cycle, except when a primary barrier fails. The operational phases of the barrier equipment, component, or assembly are drilling, completion, workover, intervention, injection, production, or abandonment. BSEE may consider non-barrier structural components of a barrier system as a Category 2 Barrier if failure of this structural component could reasonably result in a Primary Barrier failure.

Fit for Purpose means a determination made by an I3P at the conclusion of I3P review that the barrier equipment design has been verified and validated in conformance with recognized engineering standards and any additional project specification requirements; that the material selection, design verification analysis, design validation testing, and quality control are appropriate to justify the technical specifications; and that the technical specifications meet or exceed a project's site specific functional requirements.

Fit for Service means a determination made by the operator that the material selection, design verification analysis, design validation testing, and quality control of the barrier equipment is appropriate to justify the technical specifications and that the technical specifications meet or exceed a project's site-specific functional requirements.

New or unusual technology means equipment or procedures used for any drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment operations that meet any of the following criteria:

(1) Has not been approved for use or used extensively in a BSEE OCS Region;

(2) Has not been approved for use or used extensively under the anticipated operating conditions;

(3) Has operating characteristics that are outside the performance parameters established in this part;

(4) Will operate in an HPHT environment as defined in § 250.105; or

(5) Is part of a primary or secondary barrier system that uses materials, design analysis techniques, validation testing methods, or manufacturing processes not addressed in existing industry standards.

Primary Barrier means the equipment, material, component, or assembly that is designated as the principal means of isolating the hydrocarbon pressure source from people and the environment.

Secondary Barrier means the equipment, material, component, or assembly that is designated as the secondary means of isolating the hydrocarbon pressure source from people and the environment.

Subsea tieback development technology means, but is not limited to, floating production systems, tension leg platforms, spars, Floating Production Storage and Offloading (FPSO) systems, guyed towers, compliant towers, subsea manifolds, subsea wells, hybrid wells, production risers, export risers, and other subsea completion or production components that rely on a remote site or host facility for utility and well control services.

§ 250.201 What plans and information must I submit before I conduct any activities on my lease or unit?

(a) Plans and permits. Before you conduct the activities on your lease or unit listed in the following table, you must submit, and BSEE must approve, the listed plans (or relevant portions thereof), and any applicable permits. Your plans and applicable permits may cover one or more leases or units.

You must have BSEE approval of a(n) . . . | Before you . . . | Additional information

(1) New or Unusual Technology Conceptual Plan | install the new or unusual technology | (i) Must be approved by BSEE before it will approve any associated application or permit (e.g., pipeline, platform, APD, APM) involving the use of new or unusual technology. (ii) May be independent of a project Conceptual Plan or DWOP. (iii) BSEE will not approve this Conceptual Plan until all associated I3P Reports (if required) are submitted and are reviewed by BSEE. (iv) May not contain equipment identified as a primary or secondary barrier.

(2) New or Unusual Technology Barrier Equipment Conceptual Plan | install the new or unusual technology that is identified as barrier equipment | (i) Is required for any project or system involving new or unusual technology that is also identified as a primary or secondary barrier. (ii) Must be approved by BSEE before it will approve any associated application or permit (e.g., pipeline, platform, APD, APM) involving the use of new or unusual technology identified as barrier equipment as applicable for the permit scope. (iii) BSEE will not approve this Conceptual Plan until all associated I3P Reports are submitted and reviewed by BSEE.

(3) Project Conceptual Plan | conduct post-drilling installation or well completion activities for a deepwater development project, or for any project that will involve the use of a subsea tieback development technology in any water depth, which may include new or unusual technology | (i) Must be approved before well completion permit approval (e.g., APM). (ii) Any relevant new or unusual technology associated with completion operations must be approved by BSEE before project Conceptual Plan approval.

(4) Deepwater Operations Plan (DWOP) | (i) conduct post-completion installation activities for a deepwater development project, or for any project that will involve the use of a subsea tieback development technology in any water depth, which may include new or unusual technology; and (ii) initiate production activities | Must include reference to all applicable, previously approved Conceptual Plans for the associated development project.

(b) Submitting additional information. On a case-by-case basis, the Regional Supervisor may require you to submit additional information if the Regional Supervisor determines that it is necessary to evaluate your proposed plan or permit.

(c) Referencing. In preparing your proposed plan or permit, you may reference information and data discussed in other plans or permits you previously submitted or that are otherwise readily available to BSEE.

(d) All plans listed under paragraph (a) of this section that are initially submitted after October 29, 2024 must comply with the requirements of this subpart.

§ 250.202 How must I protect the rights of the Federal government?

(a) To protect the rights of the Federal government, you must either:

(1) Drill and produce the wells that the Regional Supervisor determines are necessary to protect the Federal government from loss due to production on other leases or units or from adjacent lands under the jurisdiction of other entities (e.g., State and foreign governments); or

(2) Pay a sum that the Regional Supervisor determines as adequate to compensate the Federal government for your failure to drill and produce any well.

(b) Payment under paragraph (a)(2) of this section may constitute production in paying quantities for the purpose of extending the lease term.

(c) You must complete and produce any penetrated hydrocarbon-bearing zone that the Regional Supervisor determines is necessary to conform to sound conservation practices.

§ 250.203 Are there special requirements if my well affects an adjacent property?

For wells that could intersect or drain an adjacent property, the Regional Supervisor may require special measures to protect the rights of the Federal government and objecting lessees or operators of adjacent leases or units.

§ 250.204 Requirements for high pressure high temperature (HPHT) barrier equipment.

If you plan to install HPHT barrier equipment, you must submit information with your applicable Project Conceptual Plan, New or Unusual Technology Barrier Equipment Conceptual Plan, DWOP, and applicable permit(s) that demonstrates the equipment is fit for service in the applicable HPHT environment. You must follow the applicable DWOP Process requirements (e.g., §§ 250.229 and 250.242).

§ 250.205 [Reserved]
82 Barrier Equipment and Systems
§ 250.206 What equipment does BSEE consider to be a barrier?

A barrier or barrier system is any engineered equipment, material, component, or assembly that is installed to contain a hydrocarbon pressure source(s) to prevent harm to people or the environment. BSEE only recognizes barriers that are either permanently or temporarily installed, pressure controlling, and/or pressure containing. You must be able to activate pressure controlling barriers on demand (i.e., closed by an operator or automated safety system). You must function test and pressure test any pressure controlling barriers or barrier systems to defined acceptance criteria that can be repeated. You must pressure test any pressure containing barrier or barrier system to defined acceptance criteria that can be repeated.

§ 250.207 How must barrier systems be used?

You must install and maintain a primary and a secondary barrier system (redundant barriers) to prevent a loss of containment during any operational phase of a well, flowline, pipeline, production, or riser system.

83 Activities and Post-Approval Requirements for the EP, DPP, DWOP, and DOCD
§ 250.208 How must I conduct activities under an approved EP, DPP, or DOCD?

(a) Compliance. You must conduct all of your lease and unit activities according to your approved EP, DPP, or DOCD and any approval conditions. If you fail to comply with your approved EP, DPP, or DOCD:

(1) You may be subject to BSEE enforcement action, including civil penalties; and

(2) The lease(s) involved in your EP, DPP, or DOCD may be forfeited or cancelled under 43 U.S.C. 1334(c) or (d). If this happens, you may not be entitled to compensation under 30 CFR 550.185(b) and 30 CFR 556.1102.

(b) Emergencies. Nothing in this subpart or in your approved EP, DPP, or DOCD relieves you of or limits your responsibility to take appropriate measures to meet emergency situations. In an emergency situation, the Regional Environmental Officer may approve or require departures from your approved EP, DPP, or DOCD.

§ 250.209 What must I do to conduct activities under the approved EP, DPP, or DOCD?

(a) Approvals and permits. Before you conduct activities under your approved EP, DPP, or DOCD you must obtain the following approvals and or permits, as applicable, from the District Manager or BSEE Regional Supervisor:

(1) Approval of Applications for Permits to Drill (APDs) (see § 250.410);

(2) Approval of production safety systems (see § 250.800);

(3) Approval of new platforms and other structures (or major modifications to platforms and other structures) (see § 250.905);

(4) Approval of applications to install lease term pipelines (see § 250.1007); and

(5) Other permits, as required by applicable law.

(b) Conformance. The activities proposed in these applications and permits must conform to the activities described in detail in your approved EP, DPP, or DOCD.

§ 250.210 Do I have to conduct post-approval monitoring?

The Regional Supervisor may direct you to conduct monitoring programs, including monitoring in accordance with the ESA and the MMPA, in association with your approved EP, DPP, DWOP, or DOCD. You must retain copies of all monitoring data obtained or derived from your monitoring programs and make them available to BSEE upon request. The Regional Supervisor may require you to:

(a) Submit monitoring plans for approval before you begin work; and

(b) Prepare and submit reports that summarize and analyze data and information obtained or derived from your monitoring programs. The Regional Supervisor will specify requirements for preparing and submitting these reports.

§ 250.211 What are my new or unusual technology failure reporting requirements?

If you have an approved new or unusual technology and it experiences a failure (i.e., any condition that prevents the equipment from meeting its functional specification) during or post-installation, you must notify the applicable Regional Supervisor within 30 days of the failure. You must also provide a failure analysis report as soon as it is available following notification. The failure analysis report must include any results of and potential root cause(s) of the failure. You must also follow all applicable failure or incident reporting requirements associated with the failure (e.g., §§ 250.188, 250.730, and 250.803).

§§ 250.212-250.219 [Reserved]
84 Deepwater Operations Plan (DWOP) Process
§ 250.220 What is the DWOP process?

(a) The DWOP process consists of providing sufficient information from a total system approach for BSEE to review:

(1) A deepwater development project,

(2) A subsea tieback development technology, or

(3) Any other project or system that uses new or unusual technology during any phase of the following operations: drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment.

(b) The DWOP process does not replace but complements other submittals required by the regulations, such as BOEM EPs, DPPs, and DOCDs, or BSEE applications and/or permits (e.g., APD, Application for Permit to Modify (APM), pipeline application, and platform application). BSEE will use the information in your DWOP process to determine whether the project will be developed in an acceptable manner, particularly with respect to operational safety and environmental protection involved with a deepwater development project, subsea tieback development technology, or new or unusual technology.

(c) The DWOP process consists of two phases:

(1) The Conceptual Plans. The Conceptual Plans outline certain equipment and process specifications, operational concepts, and basis of design that you plan to use for project development, and for applicable equipment design, installation, and operation. Sections 250.227 through 250.229 prescribe what each of the Conceptual Plans must contain. Each Conceptual Plan may be submitted separately or combined as applicable; and

(2) The DWOP. The DWOP identifies specific design, fabrication, installation and operational requirements for equipment, systems, and activities as applicable in §§ 250.236 through 250.242.

(d) You must submit to BSEE the applicable plan(s) covered under the DWOP process as appropriate (see § 250.225 for Conceptual Plan requirements and § 250.235 for DWOP requirements). Certain projects requiring New or Unusual Technology Conceptual Plans or New or Unusual Technology Barrier Equipment Conceptual Plans may not be required to have an associated Project Conceptual Plan or DWOP.

§ 250.221 When must I use the DWOP process?

(a) You must use the DWOP process for any project that meets any of the following criteria:

(1) Is planned in water depths greater than 1000 ft;

(2) Will use subsea tieback development technology, regardless of water depth; or

(3) Will use any new or unusual technology for any drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment project.

(b) If you are unsure if your project will use subsea tieback development technology or new or unusual technology, contact the Regional Supervisor for guidance.

§§ 250.222-250.224 [Reserved]
85 Conceptual Plans
§ 250.225 What are the types of Conceptual Plans that I must submit?

There are three types of Conceptual Plans:

(a) A Project Conceptual Plan is required for any project that is planned in water depths greater than 1000 feet, will use subsea tieback development technology, or will use new or unusual technology for completion, injection, production, pipeline, or platform operations;

(b) A New or Unusual Technology Conceptual Plan is required for any project or system that involves equipment or procedures that are considered new or unusual technology (see § 250.200 for the definition of new or unusual technology) for drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment operations; and

(c) A New or Unusual Technology Barrier Equipment Conceptual Plan is required for any project or system involving new or unusual technology that is also identified as a primary or secondary barrier (see § 250.200 for the definition of primary and secondary barriers) for drilling, completion, workover, intervention, injection, production, pipeline, platform, decommissioning, or abandonment operations.

§ 250.226 When and how must I submit each applicable Conceptual Plan?

You must submit each applicable Conceptual Plan to the Regional Supervisor after you have decided on the general concept(s) for a project or system, and before you finalize engineering design of the equipment, well, well safety control system, or subsea production systems. You must submit, for BSEE approval, each Conceptual Plan according to the following table:

Conceptual plan type | Where to find the description (§) | Additional information

(a) Project Conceptual Plan | 250.227 | You may not complete any production or injection well or install the tree before BSEE has approved the Project Conceptual Plan.

(b) New or Unusual Technology Conceptual Plan | 250.228 | (1) Operations and approval timing requirements are as follows: (i) You may not install any new or unusual technology until BSEE approves your New or Unusual Technology Conceptual Plan,

(ii) You may not complete any production or injection well or install a tree before BSEE has approved all New or Unusual Technology Conceptual Plans associated with all well completion equipment and the Project Conceptual Plan, and

(iii) BSEE must first approve your New or Unusual Technology Conceptual Plan associated with subsea production systems before the DWOP may be approved. You may install this new or unusual technology following BSEE permit approval (e.g., pipeline application) and prior to DWOP approval.

(2) The Regional Supervisor may require the operator to use an I3P to perform certain functions and verifications in accordance with § 250.231, as applicable.

(3) BSEE will not approve a New or Unusual Technology Conceptual Plan until you submit and BSEE reviews all I3P Reports (if any required).

(4) BSEE must approve your New or Unusual Technology Conceptual Plan before it will approve any associated application or permit application (e.g., pipeline application, platform application, APD, APM).

(5) You must submit separate New or Unusual Technology Conceptual Plans for each piece of equipment at an assembly level (e.g., BOP, tree, wellhead system, or tubing head spool).

(c) A New or Unusual Technology Barrier Equipment Conceptual Plan | 250.229 | (1) You must submit a New or Unusual Technology Barrier Equipment Conceptual Plan for any project or system involving new or unusual technology that is also identified as a primary or secondary barrier.

(2) Operations and approval timing requirements are as follows:

(i) BSEE must first approve your New or Unusual Technology Barrier Equipment Conceptual Plan prior to you installing new or unusual technology identified as barrier equipment,

(ii) You may not complete any production or injection well or install the tree before BSEE has approved all the New or Unusual Technology Barrier Equipment Conceptual Plans associated with all well completion equipment and the Project Conceptual Plan, and

(iii) BSEE must first approve your New or Unusual Technology Barrier Equipment Conceptual Plan associated with subsea production systems before the DWOP may be approved. You may install this equipment after BSEE permit approval (e.g., pipeline application) and prior to DWOP approval.

(3) BSEE must first approve your New or Unusual Technology Barrier Equipment Conceptual Plan before it will approve any associated application or permit application (e.g., pipeline application, platform application, APD, APM).

(4) All new or unusual technology identified as barrier equipment requires the use of an Independent Third Party (I3P) to perform certain functions and verifications in accordance with § 250.231. BSEE will not approve New or Unusual Technology Barrier Equipment Conceptual Plans until you submit and BSEE reviews all required I3P Reports pursuant to § 250.231.

(5) You must submit separate New or Unusual Technology Barrier Equipment Conceptual Plans for each piece of equipment at an assembly level (e.g., BOP, tree, wellhead system, tubing head spool).

§ 250.227 What must the Project Conceptual Plan contain?

In the Project Conceptual Plan, you must explain the basis of design that you will use to develop the field. You must include the following information:

(a) An overview of the development concept(s);

(b) The system control type (i.e., direct hydraulic or electro-hydraulic);

(c) The estimated distance from each of the wells to the host platform, and umbilical length(s);

(d) A statement that the subsea production safety system will be designed to comply with Subpart H of this part;

(e) For a new facility, a description of the type of facility you plan to install (e.g. spar, tension leg platform (TLP), FPSO, etc.);

(f) For a subsea tie back to an existing facility:

(1) A description of known structural modifications that you will need to make to accommodate the tieback, including a statement about whether these accommodations constitute minor or major modifications,

(2) The BSEE-approved service life of the existing facility, and

(3) A description of how you will evaluate whether the modifications may affect the BSEE-approved service life.

(g) A statement regarding whether the host facility will be manned or unmanned;

(h) A schedule of development activities, including well completion, facility installation, and date of first oil;

(i) Schematics, including:

(1) A proposed well location plat,

(2) A conceptual subsea field schematic depicting the planned development infrastructure that contains (as applicable) the wells, pipelines, manifolds, subsea booster pumps, high integrity pressure protection system, riser systems, umbilical(s), and facility footprint,

(3) The surface or subsea tree, and

(4) A proposed wellbore and completion schematic for a typical well (including Surface Controlled Subsurface Safety Valve (SCSSV) location and chemical injection points; and depiction or description of gas zones, if any, behind the production casing or production liner and how those gas zones will be isolated).

(j) A description of the drilling and completion systems;

(k) The estimated shut-in tubing pressure for the proposed well(s), including the calculation used to arrive at the estimate, specifying true vertical depth (TVD), reservoir pressure, and the fluid gradient used, or a brief discussion of the pressure volume temperature (PVT) data used for estimation;

(l) The wellbore static bottomhole temperature and the estimated flowing temperature at the tree;

(m) The pressure and temperature rating of the tree and wellhead;

(n) Whether there will be corrosive production (e.g., hydrogen sulfide (H2S), Carbon dioxide (CO2), Mercury (Hg) or injection fluids (e.g., acid)), including concentrations;

(o) Whether any of the proposed equipment will be re-furbished and re-certified;

(p) Whether enhanced recovery is planned for the early life of the project;

(q) Whether any new or unusual technology will be used to develop your project involving the following: drilling, completion, injection, production, risers, pipelines, or platforms;

(r) Whether the well(s) will include smart completion technology;

(s) A list of requests for any alternate procedures or equipment in accordance with § 250.141 and request for departures in accordance with § 250.142 associated with your applicable Conceptual Plans; and

(t) Documentation demonstrating payment of the service fee listed in § 250.125.

§ 250.228 What must the New or Unusual Technology Conceptual Plan contain?

(a) You must include the following information, as applicable, in your New or Unusual Technology Conceptual Plan:

(1) How the New or Unusual Technology Conceptual Plan fits within your overall site specific project, if applicable, including an overview of the project development concepts.

(2) A description of the technology and specific conditions under which it will be used;

(3) A description of shut-in capabilities and procedures;

(4) A description of redundancies of critical components or systems that will be used;

(5) A discussion of how the new or unusual technology could impact the barrier or safety system, if any, including:

(i) The detection method for new or unusual technology failure;

(ii) A description of how barriers or safety systems function to a fail-safe state when impacted by tew or unusual technology failure;

(6) Information on inspection and testing capabilities;

(7) A risk assessment and failure mode analysis;

(8) Operating procedures;

(9) A history of development and application of the technology;

(10) The basis of design, including design verification and validation testing;

(11) Detailed schematics identifying all components;

(12) A justification for new or unusual technology use, and any additional information required for a complete review;

(13) A list of requests for alternate procedures or equipment in accordance with § 250.141 and request for departures in accordance with § 250.142 needed for the new or unusual technology proposed in your New or Unusual Technology Conceptual Plan;

(14) A statement that the technology is fit for service in the applicable environment (for the specific project at location); and

(15) Documentation demonstrating payment of the service fee listed in § 250.125.

(b) The Regional Supervisor may require the use of an I3P according to § 250.231 if the system or equipment you propose to use requires a high degree of specialized or technically complex engineering knowledge, expertise, and experience to evaluate, or if existing industry standards do not address the system or equipment you propose to use.

(1) The Regional Supervisor may also require you to follow the I3P requirements according to § 250.232, as applicable, on a case-by-case basis.

(2) If you have any questions about I3P requirements for the New or Unusual Technology Conceptual Plan, contact the applicable Regional Supervisor.

§ 250.229 What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?

Your New or Unusual Technology Barrier Equipment Conceptual Plan must include the following information:

(a) A description how the New or Unusual Technology Barrier Equipment Conceptual Plan fits within your overall site-specific project, if applicable. You must include an overview of the project development concepts and a proposed schedule for submittal of associated Conceptual Plans;

(b) Detailed schematics depicting the primary and secondary barriers that include all components, assemblies, or sub-assemblies, each labeled and categorized as a Category 1 barrier or Category 2 barrier;

(c) A list of the primary and secondary barriers that includes all components, assemblies, or sub-assemblies specifying each assigned barrier as either a Category 1 barrier or Category 2 barrier;

(d) A list of the engineering standards that will be used in the equipment's material selection and qualification, design verification analysis, and design validation testing;

(e) A list of requested alternate procedures or equipment in accordance with § 250.141 and requested departures in accordance with § 250.142 needed for the new or unusual technology barrier equipment proposed in your New or Unusual Technology Barrier Equipment Conceptual Plan;

(f) A list of the functional requirements (e.g., environmental and physical loads (magnitude and frequency)) for which the barrier equipment is being designed;

(g) A description of the equipment's safety critical functions, (e.g., function(s) performed by or inherent to the equipment enabling it to achieve or maintain a safe state);

(h) An I3P nomination, in accordance with § 250.231(a);

(i) An I3P verification plan that includes the following:

(1) A discussion of the equipment's material selection and qualification;

(2) A discussion of the equipment's design verification analyses;

(3) A discussion of the equipment's design validation testing;

(4) An explanation of why the analyses, processes, and procedures ensure that the equipment is fit for service in the applicable environment; and

(5) Details regarding how the I3P will address the additional items listed in § 250.232.

(j) Documentation demonstrating payment of the service fee listed in § 250.125.

§ 250.230 When are you required to submit an I3P Report?

You must submit to BSEE any I3P reports required in § 250.232 for any equipment identified in your New or Unusual Technology Barrier Equipment Conceptual Plan and when required by the Regional Supervisor. BSEE will not approve your associated Conceptual Plan until BSEE reviews the required I3P Reports.

§ 250.231 What are your requirements for the Independent Third Party (I3P) nomination?

In accordance with each applicable Conceptual Plan, you must:

(a) Nominate I3P(s) to review the design verification and design validation documentation of the Original Equipment Manufacturer (OEM). Your I3P must be a technical classification society, a licensed professional engineering firm, or a registered professional engineer capable of providing the required verifications and validations. You must submit your I3P nomination(s) within the applicable Conceptual Plan for separate BSEE acceptance before BSEE will approve the applicable Conceptual Plan. Your I3P nomination must include the following descriptions:

(1) Previous experience in third-party verification and validation or experience in the design, fabrication, and installation of applicable offshore oil and gas equipment;

(2) Technical capabilities of the individual or the primary staff for the specific project;

(3) Size and type of organization or corporation;

(4) In-house availability of, or access to, appropriate technology to review the specific project. This should include, but not limited to, computer programs, hardware, and equipment as applicable;

(5) Ability to perform the I3P functions for the specific project considering current commitments (e.g., project timelines, schedules, and personnel availability); and

(6) Previous experience with BSEE requirements and procedures.

(b) You must ensure that the I3P has access to all associated documentation and equipment related to items listed on the I3P verification plan defined at § 250.229(i) and necessary for performance of complete reviews in accordance with § 250.232, including relevant OEM documentation (including documentation and data labeled as confidential and proprietary) and access to the OEM fabrication and manufacturing locations if such access is necessary to review the data.

(c) If your project involves submittal of multiple Conceptual Plans, you may propose to use the services of an I3P previously accepted by BSEE for the same project, and not submit the items required under paragraph (a), if the BSEE-accepted I3P's qualifications are still valid and applicable to provide the required verifications and validations. You must submit documentation regarding the previous I3P nomination acceptance.

§ 250.232 What are the I3P review requirements for Conceptual Plan reviews?

In accordance with each applicable Conceptual Plan, the I3P must:

(a) Review the following information regarding the applicable equipment and/or system:

(1) Basis of Design, technical specification of the equipment (if known at this point in the design process) and functional requirements of the specific project (e.g., environmental and physical loads (magnitude and frequency));

(2) Risk assessment and failure mode analysis;

(3) Material specification, selection, qualification, and testing;

(4) Design verification analysis, including:

(i) Structural/strength analysis, and

(ii) Fatigue assessment and/or analysis.

(5) If fatigue is identified as a potential failure mode, as identified in the fatigue assessment and/or analysis in paragraph (a)(4) of this section, the plan to record and gather data (load monitoring) in order to conduct a future fatigue analysis;

(6) Design validation testing; and

(7) A fabrication, quality management system, and inspection and test plan that identifies the quality control/quality assurance process, and inspection of the final products.

(b) Submit a report to BSEE documenting the review of each item covered under paragraph (a) of this section. Each report must clearly identify all OEM and operator documents used during the I3P review. The report must also include:

(1) The equipment and/or system's technical specifications, including a statement that the equipment and/or system is fit for purpose for the technical specification by the I3P; and

(2) Verification that the equipment's technical specifications meet or exceed the project's functional requirements, including a statement that the equipment and/or system is fit for purpose for the proposed project by the I3P.

(c) For any new project, you may use previous I3P reviews of equipment and/or systems technical specification that was approved in a previous Conceptual Plan. The Regional Supervisor may accept a final report in accordance with paragraph (c) of this section that includes the following:

(1) A statement that the previous report submitted pursuant to of paragraph (b) of this section remains valid;

(2) Verification that the equipment's technical specifications meet or exceed the proposed project's functional requirements; and

(3) A statement by the I3P that the equipment and/or system is fit for purpose for the proposed project.

§ 250.233 General requirements for any I3P Report.

An I3P Report as required in § 250.232 must be a standalone document that clearly summarizes the required verification and validation work performed and must contain a sufficient level of detail (e.g., quantitative information) and clarity to establish the basis of the I3P's findings. Each report must identify the OEM or operator documents reviewed, describe the detailed I3P review, and convey the results of the I3P's review without requiring BSEE to review of any other referenced documents.

§ 250.234 [Reserved]
86 DWOP Approval
§ 250.235 When and how must I submit the DWOP?

(a) You must submit the DWOP to the Regional Supervisor after BSEE has approved your Project Conceptual Plan and you have substantially completed system design, and before you conduct installation activities post-well completion for:

(1) A deepwater development project;

(2) A project that will use subsea tieback development technology in any water depth; or

(3) An HPHT development project, any project that uses Category 1 or 2 new or unusual technology barrier equipment, or any project that uses new or unusual technology that may impact the safety critical function of Category 1 or 2 barrier equipment regardless of the water depth.

(b) You may install subsea systems and associated pipelines after you have received applicable BSEE permit(s) and Conceptual Plan approvals. However, you may not begin production from the well until BSEE approves your DWOP.

§ 250.236 What information must I submit with the DWOP?

Your DWOP must contain the following information, as applicable:

Information that you must include with your DWOP | Where to find the description (§)

(a) General information | 250.237

(b) Well or completion information | 250.238

(c) Structural information | 250.239

(d) Production safety system information | 250.240

(e) Subsea system and pipeline information | 250.241

(f) New or unusual technology information | 250.242

§ 250.237 What general information must my DWOP include?

You must include the following general information in your DWOP, as applicable:

(a) A list of requests for any alternate procedures or equipment in accordance with § 250.141 and requests for departures in accordance with § 250.142 applicable to the DWOP, and a list of any identified alternate procedures or equipment or departures for which you may request approval in any future applicable permit or application. You do not need to list alternative procedures or equipment or departure requests that were previously submitted and approved for the same project's Conceptual Plans unless the same alternate procedures or equipment or departure requests are needed for a different piece of equipment for post-completion activities.

(b) Documentation demonstrating payment of the service fee listed in § 250.125; and

(c) A list of any associated industry standards not incorporated in the regulations that you are using for your project design or operation.

§ 250.238 What well or completions information must my DWOP include?

You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):

(a) A description and schematic of the typical wellbore, casing, and completion;

(b) Information concerning the drilling and completion systems; and

(c) Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.

§ 250.239 What structural information must my DWOP include?

You must include the following information in your DWOP, as applicable, to align with the activities to be addressed in the associated platform application, including any major modifications:

(a) Structural design, fabrication, and installation information;

(b) Design, fabrication, installation, and monitoring information on the tendon, or mooring systems, including the turret or buoy system, if applicable; and

(c) Information on any active station keeping system(s) involving thrusters or other means of propulsion.

§ 250.240 What production safety system information must my DWOP include?

You must include the following information in your DWOP, as applicable, to be consistent with the activities you plan to address in the associated production safety system application:

(a) A general description of the operating procedures;

(b) Information about the design, fabrication, and operation of an offtake system for transferring produced hydrocarbons to a transport vessel, including a table summarizing the curtailment of production and offloading based on operational considerations;

(c) A description of the process facility installation and commissioning procedure;

(d) A safety analysis flow diagram of the production system from the SCSSV downstream to the first item of separation equipment;

(e) A statement that the surface and/or subsea safety system and emergency support systems will comply with Subpart H of this part. This statement must include:

(1) The methods, frequency, and acceptance criteria for testing the underwater safety valves (USVs), SCSSVs, and boarding shutdown valves;

(2) A description of the function and testing of the host facility Emergency Shutdown Device (ESD) system and its interface to the subsea system; and

(3) If applicable, a description of the surface and/or subsea safety system and emergency support systems not covered in Subpart H of this part. If you propose to use systems not covered in Subpart H of this part, you must request an approval of alternate procedures or equipment according to § 250.141, and you must also include a table that depicts what valves will close, at what times, and for what events or reasons; and

(f) Information regarding the design, operation, maintenance, personnel competency, and testing of your subsea leak detection system to protect your subsea field/infrastructure (e.g., trees, manifolds, jumpers). You must include a description of the procedures regarding how you will operate the system, ensure system functionality, identify a leak, and the actions you will take if a leak is identified.

§ 250.241 What subsea systems and pipeline information must my DWOP include?

(a) You must include the following information common to the subsea system and the associated pipeline systems, which constitute all or part of a single project development covered by the DWOP and/or is consistent with activities addressed in your associated pipeline application, as applicable:

(1) The subsea field schematic depicting the planned subsea development equipment and infrastructure, including wells/trees, non-pipe subsea equipment, pipeline route(s), pipeline riser systems, umbilical(s), and platform footprint;

(2) A description of the subsea development project detailing the subsea and pipeline equipment design criteria and analysis procedures (including industry standards, pressure and temperature ratings, materials selection), testing methods, and general operational procedures;

(3) A description of the fabrication and assembly/testing location of subsea trees, pipelines, and non-pipe subsea equipment (manifold, Pipeline End Manifold (PLEM), Pipeline End Termination (PLET), Subsea Umbilical Termination Assembly (SUTA), subsea pumps, suction piles, etc.);

(4) A summary of the Integrity Management Program for subsea tieback development technologies, including a plan for inspection and monitoring to support assessment of the condition of the systems a minimum of once every 10 years. This should include, but is not limited to, the in-service inspections or surveys of hull and topsides structures, tendons, mooring, and pipeline and/or wellbore riser systems to assess component condition by inspection and analysis after each significant environmental event (e.g., hurricane, earthquake, loop and eddy currents, or mudslide) impacting the system, or once every 10 years, whichever occurs first. You must also include in your Integrity Management Plan a description of how you will determine significant environmental events; and

(5) A summary of safety and environmental controls.

(b) You must include the following information about subsea systems that constitute all or part of a single project development covered by the DWOP:

(1) The system control type (e.g., direct hydraulic or electro-hydraulic);

(2) Well tree(s), wellhead, and non-pipe equipment general arrangement drawings and schematics, with size and valve type annotations to illustrate the tree and other equipment in operation;

(3) The estimated shut-in tubing pressure for the proposed well(s), including the calculation used to arrive at the estimate, specifying TVD, reservoir pressure, and the fluid gradient used, or a brief discussion of the PVT data used for estimation;

(4) The wellbore static bottomhole temperature and the estimated flowing temperature at the tree, including a description of the method used to calculate this estimate;

(5) A description of the umbilical(s) and umbilical connection(s), including an umbilical cross-section schematic;

(6) A description of the chemical or other injection systems and/or enhanced recovery systems you plan to use;

(7) A description of the corrosion monitoring and prevention/inhibition processes;

(8) Details of any re-furbished and/or re-certified equipment you plan to use; and

(9) A schedule of development activities, including well completion, facility installation, and anticipated date of first oil.

(c) You must include the following pipeline information in your DWOP, as applicable, to be consistent with your associated pipeline application(s):

(1) General design and fabrication information for each pipeline riser system;

(2) If you propose to use a pipeline free standing hybrid riser (FSHR) on a permanent installation that uses a buoyancy air can suspended from the top of the riser, you must provide the following information in your DWOP as part of the discussions required by paragraphs (b)(1) and (2) of this section:

(i) A detailed description and drawings of the FSHR, buoy, and the associated connection system;

(ii) Detailed information regarding the system used to connect the FSHR to the buoyancy air can, and associated redundancies; and

(iii) Descriptions of your monitoring system and monitoring plan for the pipeline FSHR and the associated connection system for fatigue, stress, and any other abnormal condition (e.g., corrosion), that may negatively impact the riser system's integrity.

(3) Pipeline and pipeline riser installation methods.

§ 250.242 What New or Unusual Technology information must my DWOP include?

You must include the following new or unusual technology information in your DWOP, as applicable:

(a) A description of any new or unusual technology being used in your development project, including a reference to previously approved New or Unusual Technology Conceptual Plans or New or Unusual Technology Barrier Equipment Conceptual Plans.

(b) A description of any new or unusual technology not covered under the New or Unusual Technology Conceptual Plan or New or Unusual Technology Barrier Equipment Conceptual Plan. You must include the same applicable information as required in § 250.228 or § 250.229.

§§ 250.243-250.244 [Reserved]
§ 250.245 May I combine the Project Conceptual Plan and the DWOP?

If your development project meets the following criteria, you may submit a combined Project Conceptual Plan/DWOP that complies with all applicable requirements for both, on or before the deadline for submitting the Project Conceptual Plan, as described in § 250.226:

(a) The project is similar to projects involving subsea tieback development technology for which you have obtained approval previously, and

(b) The project does not involve either new or unusual technology or a new platform.

§ 250.246 When must I revise my DWOP?

You must revise your approved DWOP to reflect any material change to the plan that does not involve a physical alteration of the equipment on the platform or the seabed.

§ 250.247 When must I supplement my DWOP?

You must supplement your DWOP to reflect additions or changes in your development project that:

(a) Physically alter the equipment or systems upstream of your boarding shut down valve, approved in your DWOP. If a Supplemental DWOP includes the addition of a well or wells (e.g., a new subsea field) not approved in your original DWOP, you may not complete or produce from the new well(s) until BSEE approves the Supplemental DWOP; or

(b) Involves the addition of any new or unusual technology to your project that was not previously covered under the New or Unusual Technology Conceptual Plan, New or Unusual Technology Barrier Equipment Conceptual Plan, or DWOP. You may not install any new or unusual technology until BSEE approves the applicable Conceptual Plan and Supplemental DWOP.

§ 250.248 What information must I include in my Supplemental DWOP?

You must include the following information, as applicable, in your Supplemental DWOP:

(a) The same information for your wells or equipment as required in the applicable Conceptual Plan and DWOP requirements in this subpart;

(b) A description of each applicable Conceptual Plan or DWOP section that is being impacted by the addition or change; and

(c) Documentation demonstrating payment of the service fee listed in § 250.125.

Subpart C Pollution Prevention and Control
§ 250.300 Pollution prevention.

(a) During the exploration, development, production, and transportation of oil and gas or sulphur, the lessee shall take measures to prevent unauthorized discharge of pollutants into the offshore waters. The lessee shall not create conditions that will pose unreasonable risk to public health, life, property, aquatic life, wildlife, recreation, navigation, commercial fishing, or other uses of the ocean.

(1) When pollution occurs as a result of operations conducted by or on behalf of the lessee and the pollution damages or threatens to damage life (including fish and other aquatic life), property, any mineral deposits (in areas leased or not leased), or the marine, coastal, or human environment, the control and removal of the pollution to the satisfaction of the District Manager shall be at the expense of the lessee. Immediate corrective action shall be taken in all cases where pollution has occurred. Corrective action shall be subject to modification when directed by the District Manager.

(2) If the lessee fails to control and remove the pollution, the Director, in cooperation with other appropriate Agencies of Federal, State, and local governments, or in cooperation with the lessee, or both, shall have the right to control and remove the pollution at the lessee's expense. Such action shall not relieve the lessee of any responsibility provided for by law.

(b)(1) The District Manager may restrict the rate of drilling fluid discharges or prescribe alternative discharge methods. The District Manager may also restrict the use of components that could cause unreasonable degradation to the marine environment. No petroleum-based substances, including diesel fuel, may be added to the drilling mud system without prior approval of the District Manager. For Arctic OCS exploratory drilling, you must capture all petroleum-based mud to prevent its discharge into the marine environment. The Regional Supervisor may also require you to capture, during your Arctic OCS exploratory drilling operations, all water-based mud from operations after completion of the hole for the conductor casing to prevent its discharge into the marine environment, based on various factors including, but not limited to:

(i) The proximity of your exploratory drilling operation to subsistence hunting and fishing locations;

(ii) The extent to which discharged mud may cause marine mammals to alter their migratory patterns in a manner that impedes subsistence users' access to, or use of, those resources, or increases the risk of injury to subsistence users; or

(iii) The extent to which discharged mud may adversely affect marine mammals, fish, or their habitat.

(2) You must obtain approval from the District Manager of the method you plan to use to dispose of drill cuttings, sand, and other well solids. For Arctic OCS exploratory drilling, you must capture all cuttings from operations that utilize petroleum-based mud to prevent their discharge into the marine environment. The Regional Supervisor may also require you to capture, during your Arctic OCS exploratory drilling operations, all cuttings from operations that utilize water-based mud after completion of the hole for the conductor casing to prevent their discharge into the marine environment, based on various factors including, but not limited to:

(i) The proximity of your exploratory drilling operation to subsistence hunting and fishing locations;

(ii) The extent to which discharged cuttings may cause marine mammals to alter their migratory patterns in a manner that impedes subsistence users' access to, or use of, those resources, or increases the risk of injury to subsistence users; or

(iii) The extent to which discharged cuttings may adversely affect marine mammals, fish, or their habitat.

(3) All hydrocarbon-handling equipment for testing and production such as separators, tanks, and treaters shall be designed, installed, and operated to prevent pollution. Maintenance or repairs which are necessary to prevent pollution of offshore waters shall be undertaken immediately.

(4) Curbs, gutters, drip pans, and drains shall be installed in deck areas in a manner necessary to collect all contaminants not authorized for discharge. Oil drainage shall be piped to a properly designed, operated, and maintained sump system which will automatically maintain the oil at a level sufficient to prevent discharge of oil into offshore waters. All gravity drains shall be equipped with a water trap or other means to prevent gas in the sump system from escaping through the drains. Sump piles shall not be used as processing devices to treat or skim liquids but may be used to collect treated-produced water, treated-produced sand, or liquids from drip pans and deck drains and as a final trap for hydrocarbon liquids in the event of equipment upsets. Improperly designed, operated, or maintained sump piles which do not prevent the discharge of oil into offshore waters shall be replaced or repaired.

(5) On artificial islands, all vessels containing hydrocarbons shall be placed inside an impervious berm or otherwise protected to contain spills. Drainage shall be directed away from the drilling rig to a sump. Drains and sumps shall be constructed to prevent seepage.

(6) Disposal of equipment, cables, chains, containers, or other materials into offshore waters is prohibited.

(c) Materials, equipment, tools, containers, and other items used in the Outer Continental Shelf (OCS) which are of such shape or configuration that they are likely to snag or damage fishing devices shall be handled and marked as follows:

(1) All loose material, small tools, and other small objects shall be kept in a suitable storage area or a marked container when not in use and in a marked container before transport over offshore waters;

(2) All cable, chain, or wire segments shall be recovered after use and securely stored until suitable disposal is accomplished;

(3) Skid-mounted equipment, portable containers, spools or reels, and drums shall be marked with the owner's name prior to use or transport over offshore waters; and

(4) All markings must clearly identify the owner and must be durable enough to resist the effects of the environmental conditions to which they may be exposed.

(d) Any of the items described in paragraph (c) of this section that are lost overboard shall be recorded on the facility's daily operations report, as appropriate, and reported to the District Manager.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 46560, July 15, 2016]

§ 250.301 Inspection of facilities.

Drilling and production facilities shall be inspected daily or at intervals approved or prescribed by the District Manager to determine if pollution is occurring. Necessary maintenance or repairs shall be made immediately. Records of such inspections and repairs shall be maintained at the facility or at a nearby manned facility for 2 years.

Subpart D Oil and Gas Drilling Operations
87 General Requirements
§ 250.400 General requirements.

Drilling operations must be conducted in a safe manner to protect against harm or damage to life (including fish and other aquatic life), property, natural resources of the Outer Continental Shelf (OCS), including any mineral deposits (in areas leased and not leased), the National security or defense, or the marine, coastal, or human environment. In addition to the requirements of this subpart, you must also follow the applicable requirements of subpart G of this part.

[81 FR 26017, Apr. 29, 2016]

§§ 250.401-250.403 [Reserved]
§ 250.404 What are the requirements for the crown block?

You must have a crown block safety device that prevents the traveling block from striking the crown block. You must check the device for proper operation at least once per week and after each drill-line slipping operation and record the results of this operational check in the driller's report.

§ 250.405 What are the safety requirements for diesel engines used on a drilling rig?

You must equip each diesel engine with an air intake device to shut down the diesel engine in the event of a runaway.

(a) For a diesel engine that is not continuously manned, you must equip the engine with an automatic shutdown device;

(b) For a diesel engine that is continuously manned, you may equip the engine with either an automatic or remote manual air intake shutdown device;

(c) You do not have to equip a diesel engine with an air intake device if it meets one of the following criteria:

(1) Starts a larger engine;

(2) Powers a firewater pump;

(3) Powers an emergency generator;

(4) Powers a BOP accumulator system;

(5) Provides air supply to divers or confined entry personnel;

(6) Powers temporary equipment on a nonproducing platform;

(7) Powers an escape capsule; or

(8) Powers a portable single-cylinder rig washer.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36149, June 6, 2016]

§ 250.406 [Reserved]
§ 250.407 What tests must I conduct to determine reservoir characteristics?

You must determine the presence, quantity, quality, and reservoir characteristics of oil, gas, sulphur, and water in the formations penetrated by logging, formation sampling, or well testing.

§ 250.408 May I use alternative procedures or equipment during drilling operations?

You may use alternative procedures or equipment during drilling operations after receiving approval from the District Manager. You must identify and discuss your proposed alternative procedures or equipment in your Application for Permit to Drill (APD) (Form BSEE-0123) (see § 250.414(h)). Procedures for obtaining approval are described in § 250.141 of this part.

§ 250.409 May I obtain departures from these drilling requirements?

The District Manager may approve departures from the drilling requirements specified in this subpart. You may apply for a departure from drilling requirements by writing to the District Manager. You should identify and discuss the departure you are requesting in your APD (see § 250.414(h)).

88 Applying for a Permit To Drill
§ 250.410 How do I obtain approval to drill a well?

You must obtain written approval from the District Manager before you begin drilling any well or before you sidetrack, bypass, or deepen a well. To obtain approval, you must:

(a) Submit the information required by §§ 250.411 through 250.418;

(b) Include the well in your approved Exploration Plan (EP), Development and Production Plan (DPP), or Development Operations Coordination Document (DOCD);

(c) Meet the oil spill financial responsibility requirements for offshore facilities as required by 30 CFR part 553; and

(d) Submit the following to the District Manager:

(1) An original and two complete copies of Form BSEE-0123, Application for Permit to Drill (APD), and Form BSEE-0123S, Supplemental APD Information Sheet;

(2) A separate public information copy of forms BSEE-0123 and BSEE-0123S that meets the requirements of § 250.186; and

(3) Payment of the service fee listed in § 250.125.

§ 250.411 What information must I submit with my application?

In addition to forms BSEE-0123 and BSEE-0123S, you must include the information required in this subpart and subpart G of this part, including the following:

Information that you must include with an APD | Where to find a description

(a) Plat that shows locations of the proposed well, | § 250.412.

(b) Design criteria used for the proposed well, | § 250.413.

(c) Drilling prognosis, | § 250.414.

(d) Casing and cementing programs, | § 250.415.

(e) Diverter systems descriptions, | § 250.416.

(f) BOP system descriptions, | § 250.731.

(g) Requirements for using a MODU, and | § 250.713.

(h) Additional information. | § 250.418.

[81 FR 26017, Apr. 29, 2016]

§ 250.412 What requirements must the location plat meet?

The location plat must:

(a) Have a scale of 1:24,000 (1 inch = 2,000 feet);

(b) Show the surface and subsurface locations of the proposed well and all the wells in the vicinity;

(c) Show the surface and subsurface locations of the proposed well in feet or meters from the block line;

(d) Contain the longitude and latitude coordinates, and either Universal Transverse Mercator grid-system coordinates or state plane coordinates in the Lambert or Transverse Mercator Projection system for the surface and subsurface locations of the proposed well; and

(e) State the units and geodetic datum (including whether the datum is North American Datum 27 or 83) for these coordinates. If the datum was converted, you must state the method used for this conversion, since the various methods may produce different values.

§ 250.413 What must my description of well drilling design criteria address?

Your description of well drilling design criteria must address:

(a) Pore pressures;

(b) Formation fracture gradients, adjusted for water depth;

(c) Potential lost circulation zones;

(d) Drilling fluid weights;

(e) Casing setting depths;

(f) Maximum anticipated surface pressures. For this section, maximum anticipated surface pressures are the pressures that you reasonably expect to be exerted upon a casing string and its related wellhead equipment. In calculating maximum anticipated surface pressures, you must consider: drilling, completion, and producing conditions; drilling fluid densities to be used below various casing strings; fracture gradients of the exposed formations; casing setting depths; total well depth; formation fluid types; safety margins; and other pertinent conditions. You must include the calculations used to determine the pressures for the drilling and the completion phases, including the anticipated surface pressure used for designing the production string;

(g) A single plot containing curves for estimated pore pressures, formation fracture gradients, proposed drilling fluid weights (surface and downhole), planned safe drilling margin, and casing setting depths in true vertical measurements;

(h) A summary report of the shallow hazards site survey that describes the geological and manmade conditions if not previously submitted; and

(i) Permafrost zones, if applicable.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26017, Apr. 29, 2016; 84 FR 21973, May 15, 2019]

§ 250.414 What must my drilling prognosis include?

Your drilling prognosis must include a brief description of the procedures you will follow in drilling the well. This prognosis includes but is not limited to the following:

(a) Projected plans for coring at specified depths;

(b) Projected plans for logging;

(c) Planned safe drilling margin that is between the estimated pore pressure and the lesser of estimated fracture gradients or casing shoe pressure integrity test and that is based on a risk assessment consistent with expected well conditions and operations.

(1) Your safe drilling margin must also include use of equivalent downhole mud weight that is:

(i) Greater than the estimated pore pressure; and

(ii) Except as provided in paragraph (c)(2) of this section, a minimum of 0.5 pound per gallon below the lower of the casing shoe pressure integrity test or the lowest estimated fracture gradient.

(2) In lieu of meeting the criteria in paragraph (c)(1)(ii) of this section, you may use an equivalent downhole mud weight as specified in your APD, provided that you submit adequate documentation (such as risk modeling data, off-set well data, analog data, seismic data) to justify the alternative equivalent downhole mud weight. You may submit such justification in advance of your full APD, and BSEE may consider such justification for approval when submitted. Any such approval will be contingent upon your confirmation in the APD that your plans and the information underlying your approved justification have not changed.

(3) When determining the pore pressure and lowest estimated fracture gradient for a specific interval, you must consider related off-set and analogous well behavior observations, if available.

(d) Estimated depths to the top of significant marker formations;

(e) Estimated depths to significant porous and permeable zones containing fresh water, oil, gas, or abnormally pressured formation fluids;

(f) Estimated depths to major faults;

(g) Estimated depths of permafrost, if applicable;

(h) A list and description of all requests for using alternate procedures or departures from the requirements of this subpart in one place in the APD. You must explain how the alternate procedures afford an equal or greater degree of protection, safety, or performance, or why the departures are requested;

(i) Projected plans for well testing (refer to § 250.460);

(j) The type of wellhead system and liner hanger system to be installed and a descriptive schematic, which includes but is not limited to pressure ratings, dimensions, valves, load shoulders, and locking mechanisms, if applicable; and

(k) Any additional information required by the District Manager needed to clarify or evaluate your drilling prognosis.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26017, Apr. 29, 2016; 84 FR 21973, May 15, 2019]

§ 250.415 What must my casing and cementing programs include?

Your casing and cementing programs must include:

(a) The following well design information:

(1) Hole sizes;

(2) Bit depths (including measured and true vertical depth (TVD));

(3) Casing information, including sizes, weights, grades, collapse and burst values, types of connection, and setting depths (measured and TVD) for all sections of each casing interval; and

(4) Locations of any installed rupture disks (indicate if burst or collapse and rating);

(b) Casing design safety factors for tension, collapse, and burst with the assumptions made to arrive at these values;

(c) Type and amount of cement (in cubic feet) planned for each casing string;

(d) In areas containing permafrost, setting depths for conductor and surface casing based on the anticipated depth of the permafrost. Your program must provide protection from thaw subsidence and freezeback effect, proper anchorage, and well control;

(e) A statement of how you evaluated the best practices included in API Recommended Practice 65, Recommended Practice for Cementing Shallow Water Flow Zones in Deep Water Wells (incorporated by reference, see § 250.198), if you drill a well in water depths greater than 500 feet and are in either of the following two areas:

(1) An “area with an unknown shallow water flow potential” is a zone or geologic formation where neither the presence nor absence of potential for a shallow water flow has been confirmed.

(2) An “area known to contain a shallow water flow hazard” is a zone or geologic formation for which drilling has confirmed the presence of shallow water flow; and

(f) A written description of how you evaluated the best practices included in API Standard 65—Part 2, Isolating Potential Flow Zones During Well Construction, Second Edition (incorporated by reference, see § 250.198). Your written description must identify the mechanical barriers and cementing practices you will use for each casing string (reference API Standard 65—Part 2, Sections 4 and 5).

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50891, Aug. 22, 2012; 81 FR 26018, Apr. 29, 2016; 91 FR 35351, June 10, 2026]

§ 250.416 What must I include in the diverter description?

You must include in the diverter description:

(a) A description of the diverter system and its operating procedures;

(b) A schematic drawing of the diverter system (plan and elevation views) that shows:

(1) The size of the element installed in the diverter housing;

(2) Spool outlet internal diameter(s);

(3) Diverter-line lengths and diameters; burst strengths and radius of curvature at each turn; and

(4) Valve type, size, working pressure rating, and location.

[81 FR 26018, Apr. 29, 2016]

§ 250.417 [Reserved]
§ 250.418 What additional information must I submit with my APD?

You must include the following with the APD:

(a) Rated capacities of the drilling rig and major drilling equipment, if not already on file with the appropriate District office;

(b) A drilling fluids program that includes the minimum quantities of drilling fluids and drilling fluid materials, including weight materials, to be kept at the site;

(c) A proposed directional plot if the well is to be directionally drilled;

(d) A Hydrogen Sulfide Contingency Plan (see § 250.490), if applicable, and not previously submitted;

(e) A welding plan (see §§ 250.109 to 250.113) if not previously submitted;

(f) In areas subject to subfreezing conditions, evidence that the drilling equipment, BOP systems and components, diverter systems, and other associated equipment and materials are suitable for operating under such conditions;

(g) A request for approval, if you plan to wash out or displace cement to facilitate casing removal upon well abandonment. Your request must include a description of how far below the mudline you propose to displace cement and how you will visually monitor returns;

(h) Certification of your casing and cementing program as required in § 250.420(a)(7); and

(i) Such other information as the District Manager may require.

(j) For Arctic OCS exploratory drilling operations, you must provide the information required by § 250.470.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50892, Aug. 22, 2012; 81 FR 26018, Apr. 29, 2016; 81 FR 46561, July 15, 2016]

89 Casing and Cementing Requirements
§ 250.420 What well casing and cementing requirements must I meet?

You must case and cement all wells. Your casing and cementing programs must meet the applicable requirements of this subpart and of subpart G of this part.

(a) Casing and cementing program requirements. Your casing and cementing programs must:

(1) Properly control formation pressures and fluids;

(2) Prevent the direct or indirect release of fluids from any stratum through the wellbore into offshore waters;

(3) Prevent communication between separate hydrocarbon-bearing strata;

(4) Protect freshwater aquifers from contamination;

(5) Support unconsolidated sediments;

(6) Provide adequate centralization consistent with the guidelines of API Standard 65—Part 2 (incorporated by reference, see § 250.198); and

(7)(i) Include a certification signed by a registered professional engineer that the casing and cementing design is appropriate for the purpose for which it is intended under expected wellbore conditions, and is sufficient to satisfy the tests and requirements of this section and § 250.423. Submit this certification with your APD (Form BSEE-0123).

(ii) You must have the registered professional engineer involved in the casing and cementing design process.

(iii) The registered professional engineer must be registered in a state of the United States and have sufficient expertise and experience to perform the certification.

(b) Casing requirements. (1) You must design casing (including liners) to withstand the anticipated stresses imposed by tensile, compressive, and buckling loads; burst and collapse pressures; thermal effects; and combinations thereof.

(2) The casing design must include safety measures that ensure well control during drilling and safe operations during the life of the well.

(3) On all wells that use subsea BOP stacks, you must include two independent barriers, including one mechanical barrier, in each annular flow path (examples of barriers include, but are not limited to, primary cement job and seal assembly). For the final casing string (or liner if it is your final string), you must install one mechanical barrier in addition to cement to prevent flow in the event of a failure in the cement. A dual float valve, by itself, is not considered a mechanical barrier. These barriers cannot be modified prior to or during completion or abandonment operations. The BSEE District Manager may approve alternative options under § 250.141. You must submit documentation of this installation to BSEE in the End-of-Operations Report (Form BSEE-0125).

(4) If you need to substitute a different size, grade, or weight of casing than what was approved in your APD, you must contact the District Manager for approval prior to installing the casing.

(c) Cementing requirements. (1) You must design and conduct your cementing jobs so that cement composition, placement techniques, and waiting times ensure that the cement placed behind the bottom 500 feet of casing attains a minimum compressive strength of 500 psi before drilling out the casing or before commencing completion operations. (If a liner is used refer to § 250.421(f)).

(2) You must use a weighted fluid during displacement to maintain an overbalanced hydrostatic pressure during the cement setting time, except when cementing casings or liners in riserless hole sections.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50892, Aug. 22, 2012; 81 FR 26018, Apr. 29, 2016; 84 FR 21973, May 15, 2019; 91 FR 35351, June 10, 2026]

§ 250.421 What are the casing and cementing requirements by type of casing string?

The table in this section identifies specific design, setting, and cementing requirements for casing strings and liners. For the purposes of subpart D, the casing strings in order of normal installation are as follows: drive or structural, conductor, surface, intermediate, and production casings (including liners). The District Manager may approve or prescribe other casing and cementing requirements where appropriate.

Casing type | Casing requirements | Cementing requirements

(a) Drive or Structural | Set by driving, jetting, or drilling to the minimum depth as approved or prescribed by the District Manager | If you drilled a portion of this hole, you must use enough cement to fill the annular space back to the mudline.

(b) Conductor | Design casing and select setting depths based on relevant engineering and geologic factors. These factors include the presence or absence of hydrocarbons, potential hazards, and water depths Set casing immediately before drilling into formations known to contain oil or gas. If you encounter oil or gas or unexpected formation pressure before the planned casing point, you must set casing immediately and set it above the encountered zone | Use enough cement to fill the calculated annular space back to the mudline. Verify annular fill by observing cement returns. If you cannot observe cement returns, use additional cement to ensure fill-back to the mudline. For drilling on an artificial island or when using a well cellar, you must discuss the cement fill level with the District Manager.

(c) Surface | Design casing and select setting depths based on relevant engineering and geologic factors. These factors include the presence or absence of hydrocarbons, potential hazards, and water depths | Use enough cement to fill the calculated annular space to at least 200 feet measured depth (MD) inside the conductor casing. When geologic conditions such as near-surface fractures and faulting exist, you must use enough cement to fill the calculated annular space to the mudline.

(d) Intermediate | Design casing and select setting depth based on anticipated or encountered geologic characteristics or wellbore conditions | Use enough cement to cover and isolate all hydrocarbon-bearing zones and isolate abnormal pressure intervals from normal pressure intervals in the well. As a minimum, you must cement the annular space 500 feet MD above the casing shoe and 500 feet MD above each zone to be isolated.

(e) Production | Design casing and select setting depth based on anticipated or encountered geologic characteristics or wellbore conditions | Use enough cement to cover or isolate all hydrocarbon-bearing zones above the shoe. As a minimum, you must cement the annular space at least 500 feet MD above the casing shoe and 500 feet MD above the uppermost hydrocarbon-bearing zone.

(f) Liners | If you use a liner as surface casing, you must set the top of the liner at least 200 feet MD above the previous casing/liner shoe If you use a liner as an intermediate string below a surface string or production casing below an intermediate string, you must set the top of the liner at least 100 feet MD above the previous casing shoe. You may not use a liner as conductor casing. A subsea well casing string whose top is above the mudline and that has been cemented back to the mudline will not be considered a liner. | Same as cementing requirements for specific casing types. For example, a liner used as intermediate casing must be cemented according to the cementing requirements for intermediate casing.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26018, Apr. 29, 2016; 84 FR 21974, May 15, 2019]

§ 250.422 When may I resume drilling after cementing?

(a) After cementing surface, intermediate, or production casing (or liners), you may resume drilling after the cement has been held under pressure for 12 hours. For conductor casing, you may resume drilling after the cement has been held under pressure for 8 hours. One acceptable method of holding cement under pressure is to use float valves to hold the cement in place.

(b) If you plan to nipple down your diverter or BOP stack during the 8- or 12-hour waiting time, you must determine, before nippling down, when it will be safe to do so. You must base your determination on a knowledge of formation conditions, cement composition, effects of nippling down, presence of potential drilling hazards, well conditions during drilling, cementing, and post cementing, as well as past experience.

§ 250.423 What are the requirements for casing and liner installation?

You must ensure proper installation of casing in the subsea wellhead or liner in the liner hanger.

(a) You must ensure that the latching mechanisms or lock down mechanisms are engaged upon successfully installing the casing string.

(b) If you run a liner that has a latching mechanism or lock down mechanism, you must ensure that the latching mechanisms or lock down mechanisms are engaged upon successfully installing the liner.

(c) You must perform a pressure test on the casing seal assembly to ensure proper installation of casing or liner. You must perform this test for the intermediate and production casing strings or liners.

(1) You must submit for approval with your APD, test procedures and criteria for a successful test.

(2) You must document all your test results and make them available to BSEE upon request.

[81 FR 26019, Apr. 29, 2016, as amended at 84 FR 21974, May 15, 2019]

§§ 250.424-250.426 [Reserved]
§ 250.427 What are the requirements for pressure integrity tests?

You must conduct a pressure integrity test below the surface casing or liner and all intermediate casings or liners. The District Manager may require you to run a pressure-integrity test at the conductor casing shoe if warranted by local geologic conditions or the planned casing setting depth. You must conduct each pressure integrity test after drilling at least 10 feet but no more than 50 feet of new hole below the casing shoe. You must test to either the formation leak-off pressure or to an equivalent drilling fluid weight if identified in an approved APD.

(a) You must use the pressure integrity test and related hole-behavior observations, such as pore-pressure test results, gas-cut drilling fluid, and well kicks to adjust the drilling fluid program and the setting depth of the next casing string. You must record all test results and hole-behavior observations made during the course of drilling related to formation integrity and pore pressure in the driller's report.

(b) While drilling, you must maintain the safe drilling margin identified in § 250.414. When you cannot maintain the safe drilling margin, you must:

(1) Suspend drilling operations and submit proposed remedial actions to the District Manager. The District Manager must review and approve your proposed remedial actions, which may include limited drilling through a lost circulation zone; or

(2) Notify the District Manager and take further action in accordance with API Bulletin 92L (incorporated by reference, see § 250.198), if appropriate. You must submit a revised permit documenting any responsive actions taken.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26019, Apr. 29, 2016; 84 FR 21974, May 15, 2019; 91 FR 35351, June 10, 2026]

§ 250.428 What must I do in certain cementing and casing situations?

The table in this section describes actions that lessees must take when certain situations occur during casing and cementing activities.

If you encounter the following situation: | Then you must . . .

(a) Have unexpected formation pressures or conditions that warrant revising your casing design, | Submit a revised casing program to the District Manager for approval.

(b) Need to change casing setting depths or hole interval drilling depth (for a BHA with an under-reamer, this means bit depth) more than 100 feet true vertical depth (TVD) from the approved APD due to conditions encountered during drilling operations, | Submit those changes to the District Manager for approval and include a certification by a professional engineer (PE) that he or she reviewed and approved the proposed changes.

(c) Have indication of inadequate cement job (such as unplanned lost returns, no cement returns to mudline or expected height, cement channeling, or failure of equipment), | (1) Locate the top of cement by: (i) Running a temperature survey; (ii) Running a cement evaluation log; (iii) Using tracers in the cement and logging them prior to drill out; or (iv) Using a combination of these techniques. (2) Determine if your cement job is inadequate. If your cement job is determined to be inadequate, refer to paragraph (d) of this section. (3) If your cement job is determined to be adequate, report the results to the District Manager in your submitted WAR.

(d) Inadequate cement job, | Comply with § 250.428(c)(1) and take remedial actions. The District Manager must review and approve all remedial actions either through a previously approved contingency plan within the permit or remedial actions included in a revised permit before you may take them, unless immediate actions must be taken to ensure the safety of the crew or to prevent a well-control event. If you complete any immediate action to ensure the safety of the crew or to prevent a well-control event, submit a description of the action to the District Manager when that action is complete. Any changes to the well program, that are not included in the approved permit, will require submittal of a certification by a professional engineer (PE) certifying that they have reviewed and approved the proposed changes. You must also meet any other requirements of the District Manager for remedial actions.

(e) Primary cement job that did not isolate abnormal pressure intervals, | Isolate those intervals from normal pressures by squeeze cementing before you complete; suspend operations; or abandon the well, whichever occurs first.

(f) Decide to produce a well that was not originally contemplated for production, | Have at least two cemented casing strings (does not include liners) in the well. Note: All producing wells must have at least two cemented casing strings.

(g) Want to drill a well without setting conductor casing, | Submit geologic data and information to the District Manager that demonstrates the absence of shallow hydrocarbons or hazards. This information must include logging and drilling fluid-monitoring from wells previously drilled within 500 feet of the proposed well path down to the next casing point.

(h) Need to use less than required cement for the surface casing during floating drilling operations to provide protection from burst and collapse pressures, | Submit information to the District Manager that demonstrates the use of less cement is necessary.

(i) Cement across a permafrost zone, | Use cement that sets before it freezes and has a low heat of hydration.

(j) Leave the annulus opposite a permafrost zone uncemented, | Fill the annulus with a liquid that has a freezing point below the minimum permafrost temperature and minimizes opposite a corrosion.

(k) Plan to use a valve(s) on the drive pipe during cementing operations for the conductor casing, surface casing, or liner, | Include a description of the plan in your APD. Your description must include a schematic of the valve and height above the water line. The valve must be remotely operated and full opening with visual observation while taking returns. The person in charge of observing returns must be in communication with the drill floor. You must record in your daily report and in the WAR if cement returns were observed. If cement returns are not observed, you must contact the District Manager and obtain approval of proposed plans to locate the top of cement before continuing with operations.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50892, Aug. 22, 2012; 81 FR 26019, Apr. 29, 2016; 84 FR 21974, May 15, 2019]

90 Diverter System Requirements
§ 250.430 When must I install a diverter system?

You must install a diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter sealing element, diverter lines, and control systems. You must design, install, use, maintain, and test the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials away from facilities and personnel.

§ 250.431 What are the diverter design and installation requirements?

You must design and install your diverter system to:

(a) Use diverter spool outlets and diverter lines that have a nominal diameter of at least 10 inches for surface wellhead configurations and at least 12 inches for floating drilling operations;

(b) Use dual diverter lines arranged to provide for downwind diversion capability;

(c) Use at least two diverter control stations. One station must be on the drilling floor. The other station must be in a readily accessible location away from the drilling floor;

(d) Use only remote-controlled valves in the diverter lines. All valves in the diverter system must be full-opening. You may not install manual or butterfly valves in any part of the diverter system;

(e) Minimize the number of turns (only one 90-degree turn allowed for each line for bottom-founded drilling units) in the diverter lines, maximize the radius of curvature of turns, and target all right angles and sharp turns;

(f) Anchor and support the entire diverter system to prevent whipping and vibration; and

(g) Protect all diverter-control instruments and lines from possible damage by thrown or falling objects.

§ 250.432 How do I obtain a departure to diverter design and installation requirements?

The table below describes possible departures from the diverter requirements and the conditions required for each departure. To obtain one of these departures, you must have discussed the departure in your APD and received approval from the District Manager.

If you want a departure to: | Then you must . . .

(a) Use flexible hose for diverter lines instead of rigid pipe, | Use flexible hose that has integral end couplings.

(b) Use only one spool outlet for your diverter system, | (1) Have branch lines that meet the minimum internal diameter requirements; and (2) Provide downwind diversion capability.

(c) Use a spool with an outlet with an internal diameter of less than 10 inches on a surface wellhead, | Use a spool that has dual outlets with an internal diameter of at least 8 inches.

(d) Use a single diverter line for floating drilling operations on a dynamically positioned drillship, | Maintain an appropriate vessel heading to provide for downwind diversion.

§ 250.433 What are the diverter actuation and testing requirements?

When you install the diverter system, you must actuate the diverter sealing element, diverter valves, and diverter-control systems and control stations. You must also flow-test the vent lines.

(a) For drilling operations with a surface wellhead configuration, you must actuate the diverter system at least once every 24-hour period after the initial test. After you have nippled up on conductor casing, you must pressure-test the diverter-sealing element and diverter valves to a minimum of 200 psi. While the diverter is installed, you must conduct subsequent pressure tests within 7 days after the previous test.

(b) For floating drilling operations with a subsea BOP stack, you must actuate the diverter system within 7 days after the previous actuation. For subsequent testing, you may partially actuate the diverter element and a flow test is not required.

(c) You must alternate actuations and tests between control stations.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21975, May 15, 2019]

§ 250.434 What are the recordkeeping requirements for diverter actuations and tests?

You must record the time, date, and results of all diverter actuations and tests in the driller's report. In addition, you must:

(a) Record the diverter pressure test on a pressure chart;

(b) Require your onsite representative to sign and date the pressure test chart;

(c) Identify the control station used during the test or actuation;

(d) Identify problems or irregularities observed during the testing or actuations and record actions taken to remedy the problems or irregularities; and

(e) Retain all pressure charts and reports pertaining to the diverter tests and actuations at the facility for the duration of drilling the well.

§§ 250.440-250.451 [Reserved]
§ 250.452 What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations?

(a) When conducting exploratory drilling operations on the Arctic OCS, you must gather and monitor real-time data using an independent, automatic, and continuous monitoring system capable of recording, storing, and transmitting data regarding the following:

(1) The BOP control system;

(2) The well's fluid handling systems on the rig; and

(3) The well's downhole conditions as monitored by a downhole sensing system, when such a system is installed.

(b) During well operations, you must transmit the data identified in paragraph (a) of this section as they are gathered, barring unforeseeable or unpreventable interruptions in transmission, and have the capability to monitor the data onshore, using qualified personnel. Onshore personnel who monitor real-time data must have the capability to contact rig personnel during operations. After well operations, you must store the data at a designated location for recordkeeping purposes as required in §§ 250.740 and 250.741. You must provide BSEE with access to your real-time monitoring data onshore upon request.

[81 FR 46561, July 15, 2016]

91 Drilling Fluid Requirements
§ 250.455 What are the general requirements for a drilling fluid program?

You must design and implement your drilling fluid program to prevent the loss of well control. This program must address drilling fluid safe practices, testing and monitoring equipment, drilling fluid quantities, and drilling fluid-handling areas.

§ 250.456 What safe practices must the drilling fluid program follow?

Your drilling fluid program must include the following safe practices:

(a) Before starting out of the hole with drill pipe, you must properly condition the drilling fluid. You must circulate a volume of drilling fluid equal to the annular volume with the drill pipe just off-bottom. You may omit this practice if documentation in the driller's report shows:

(1) No indication of formation fluid influx before starting to pull the drill pipe from the hole;

(2) The weight of returning drilling fluid is within 0.2 pounds per gallon (1.5 pounds per cubic foot) of the drilling fluid entering the hole; and

(3) Other drilling fluid properties are within the limits established by the program approved in the APD.

(b) Record each time you circulate drilling fluid in the hole in the driller's report;

(c) When coming out of the hole with drill pipe, you must fill the annulus with drilling fluid before the hydrostatic pressure decreases by 75 psi, or every five stands of drill pipe, whichever gives a lower decrease in hydrostatic pressure. You must calculate the number of stands of drill pipe and drill collars that you may pull before you must fill the hole. You must also calculate the equivalent drilling fluid volume needed to fill the hole. Both sets of numbers must be posted near the driller's station. You must use a mechanical, volumetric, or electronic device to measure the drilling fluid required to fill the hole;

(d) You must run and pull drill pipe and downhole tools at controlled rates so you do not swab or surge the well;

(e) When there is an indication of swabbing or influx of formation fluids, you must take appropriate measures to control the well. You must circulate and condition the well, on or near-bottom, unless well or drilling-fluid conditions prevent running the drill pipe back to the bottom;

(f) You must calculate and post near the driller's console the maximum pressures that you may safely contain under a shut-in BOP for each casing string. The pressures posted must consider the surface pressure at which the formation at the shoe would break down, the rated working pressure of the BOP stack, and 70 percent of casing burst (or casing test as approved by the District Manager). As a minimum, you must post the following two pressures:

(1) The surface pressure at which the shoe would break down. This calculation must consider the current drilling fluid weight in the hole; and

(2) The lesser of the BOP's rated working pressure or 70 percent of casing-burst pressure (or casing test otherwise approved by the District Manager);

(g) You must install an operable drilling fluid-gas separator and degasser before you begin drilling operations. You must maintain this equipment throughout the drilling of the well;

(h) Before pulling drill-stem test tools from the hole, you must circulate or reverse-circulate the test fluids in the hole. If circulating out test fluids is not feasible, you may bullhead test fluids out of the drill-stem test string and tools with an appropriate kill weight fluid;

(i) When circulating, you must test the drilling fluid at least once each tour, or more frequently if conditions warrant. Your tests must conform to industry-accepted practices and include density, viscosity, and gel strength; hydrogenion concentration; filtration; and any other tests the District Manager requires for monitoring and maintaining drilling fluid quality, prevention of downhole equipment problems and for kick detection. You must record the results of these tests in the drilling fluid report; and

(j) In areas where permafrost and/or hydrate zones are present or may be present, you must control drilling fluid temperatures to drill safely through those zones.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50894, Aug. 22, 2012; 81 FR 26020, Apr. 29, 2016]

§ 250.457 What equipment is required to monitor drilling fluids?

Once you establish drilling fluid returns, you must install and maintain the following drilling fluid-system monitoring equipment throughout subsequent drilling operations. This equipment must have the following indicators on the rig floor:

(a) Pit level indicator to determine drilling fluid-pit volume gains and losses. This indicator must include both a visual and an audible warning device;

(b) Volume measuring device to accurately determine drilling fluid volumes required to fill the hole on trips;

(c) Return indicator devices that indicate the relationship between drilling fluid-return flow rate and pump discharge rate. This indicator must include both a visual and an audible warning device; and

(d) Gas-detecting equipment to monitor the drilling fluid returns. The indicator may be located in the drilling fluid-logging compartment or on the rig floor. If the indicators are only in the logging compartment, you must continually man the equipment and have a means of immediate communication with the rig floor. If the indicators are on the rig floor only, you must install an audible alarm.

§ 250.458 What quantities of drilling fluids are required?

(a) You must use, maintain, and replenish quantities of drilling fluid and drilling fluid materials at the drill site as necessary to ensure well control. You must determine those quantities based on known or anticipated drilling conditions, rig storage capacity, weather conditions, and estimated time for delivery.

(b) You must record the daily inventories of drilling fluid and drilling fluid materials, including weight materials and additives in the drilling fluid report.

(c) If you do not have sufficient quantities of drilling fluid and drilling fluid material to maintain well control, you must suspend drilling operations.

§ 250.459 What are the safety requirements for drilling fluid-handling areas?

You must classify drilling fluid-handling areas according to API Recommended Practice 500 (incorporated by reference, see § 250.198); or API Recommended Practice 505 (incorporated by reference, see § 250.198). In areas where dangerous concentrations of combustible gas may accumulate, you must install and maintain a ventilation system and gas monitors. Drilling fluid-handling areas must have the following safety equipment:

(a) A ventilation system capable of replacing the air once every 5 minutes or 1.0 cubic feet of air-volume flow per minute, per square foot of area, whichever is greater. In addition:

(1) If natural means provide adequate ventilation, then a mechanical ventilation system is not necessary;

(2) If a mechanical system does not run continuously, then it must activate when gas detectors indicate the presence of 1 percent or more of combustible gas by volume; and

(3) If discharges from a mechanical ventilation system may be hazardous, then you must maintain the drilling fluid-handling area at a negative pressure. You must protect the negative pressure area by using at least one of the following: a pressure-sensitive alarm, open-door alarms on each access to the area, automatic door-closing devices, air locks, or other devices approved by the District Manager;

(b) Gas detectors and alarms except in open areas where adequate ventilation is provided by natural means. You must test and recalibrate gas detectors quarterly. No more than 90 days may elapse between tests;

(c) Explosion-proof or pressurized electrical equipment to prevent the ignition of explosive gases. Where you use air for pressuring equipment, you must locate the air intake outside of and as far as practicable from hazardous areas; and

(d) Alarms that activate when the mechanical ventilation system fails.

[76 FR 64462, Oct. 18, 2011, as amended at 91 FR 35351, June 10, 2026]

92 Other Drilling Requirements
§ 250.460 What are the requirements for conducting a well test?

(a) If you intend to conduct a well test, you must include your projected plans for the test with your APD (form BSEE-0123) or in an Application for Permit to Modify (APM) (form BSEE-0124). Your plans must include at least the following information:

(1) Estimated flowing and shut-in tubing pressures;

(2) Estimated flow rates and cumulative volumes;

(3) Time duration of flow, buildup, and drawdown periods;

(4) Description and rating of surface and subsurface test equipment;

(5) Schematic drawing, showing the layout of test equipment;

(6) Description of safety equipment, including gas detectors and fire-fighting equipment;

(7) Proposed methods to handle or transport produced fluids; and

(8) Description of the test procedures.

(b) You must give the District Manager at least 24-hours notice before starting a well test.

§ 250.461 What are the requirements for directional and inclination surveys?

For this subpart, BSEE classifies a well as vertical if the calculated average of inclination readings does not exceed 3 degrees from the vertical.

(a) Survey requirements for a vertical well. (1) You must conduct inclination surveys on each vertical well and record the results. Survey intervals may not exceed 1,000 feet during the normal course of drilling;

(2) You must also conduct a directional survey that provides both inclination and azimuth, and digitally record the results in electronic format:

(i) Within 500 feet of setting surface or intermediate casing;

(ii) Within 500 feet of setting any liner; and

(iii) When you reach total depth.

(b) Survey requirements for a directional well. You must conduct directional surveys on each directional well and digitally record the results. Surveys must give both inclination and azimuth at intervals not to exceed 500 feet during the normal course of drilling. Intervals during angle-changing portions of the hole may not exceed 180 feet.

(c) Measurement while drilling. You may use measurement-while-drilling technology if it meets the requirements of this section.

(d) Composite survey requirements. (1) Your composite directional survey must show the interval from the bottom of the conductor casing to total depth. In the absence of conductor casing, the survey must show the interval from the bottom of the drive or structural casing to total depth; and

(2) You must correct all surveys to Universal-Transverse-Mercator-Grid-north or Lambert-Grid-north after making the magnetic-to-true-north correction. Surveys must show the magnetic and grid corrections used and include a listing of the directionally computed inclinations and azimuths.

(e) If you drill within 500 feet of an adjacent lease, the Regional Supervisor may require you to furnish a copy of the well's directional survey to the affected leaseholder. This could occur when the adjoining leaseholder requests a copy of the survey for the protection of correlative rights.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21975, May 15, 2019]

§ 250.462 What are the source control, containment, and collocated equipment requirements?

For drilling operations using a subsea BOP or surface BOP on a floating facility, you must have the ability to control or contain a blowout event at the sea floor.

(a) To determine your required source control and containment capabilities you must do the following:

(1) Consider a scenario of the wellbore fully evacuated to reservoir fluids, with no restrictions in the well.

(2) Evaluate the performance of the well as designed to determine if a full shut-in can be achieved without having reservoir fluids broach to the sea floor. If your evaluation indicates that the well can only be partially shut-in, then you must determine your ability to flow and capture the residual fluids to a surface production and storage system.

(b) You must have access to and the ability to deploy Source Control and Containment Equipment (SCCE) and all other necessary supporting and collocated equipment to regain control of the well. SCCE means the capping stack, cap-and-flow system, containment dome, and/or other subsea and surface devices, equipment, and vessels, which have the collective purpose to control a spill source and stop the flow of fluids into the environment or to contain fluids escaping into the environment based on the determinations outlined in paragraph (a) of this section. This SCCE, supporting equipment, and collocated equipment may include, but is not limited to, the following:

(1) Subsea containment and capture equipment, including containment domes and capping stacks;

(2) Subsea utility equipment including hydraulic power sources and hydrate control equipment;

(3) Collocated equipment including dispersant injection equipment;

(4) Riser systems;

(5) Remotely operated vehicles (ROVs);

(6) Capture vessels;

(7) Support vessels; and

(8) Storage facilities.

(c) You must submit a description of your source control and containment capabilities to the Regional Supervisor and receive approval before BSEE will approve your APD, Form BSEE-0123. The description of your containment capabilities must contain the following:

(1) Your source control and containment capabilities for controlling and containing a blowout event at the seafloor;

(2) A discussion of the determination required in paragraph (a) of this section; and

(3) Information showing that you have access to and the ability to deploy all equipment required by paragraph (b) of this section.

(d) You must contact the District Manager and Regional Supervisor for reevaluation of your source control and containment capabilities if your:

(1) Well design changes; or

(2) Approved source control and containment equipment is out of service.

(e) You must maintain, test, and inspect the source control, containment, and collocated equipment identified in the following table according to these requirements:

Equipment | Requirements, you must: | Additional information

(1) Capping stacks, | (i) Function test all pressure containing critical components on a quarterly frequency (not to exceed 104 days between tests). | Pressure containing critical components are those components that will experience wellbore pressure during a shut-in after being functioned.

(ii) Pressure test pressure containing critical components on a bi-annual basis, but not later than 210 days from the last pressure test. All pressure testing must be witnessed by BSEE (if available) and an independent third party. | Pressure containing critical components are those components that will experience wellbore pressure during a shut-in. These components include, but are not limited to: All blind rams, wellhead connectors, and outlet valves.

(iii) Notify BSEE at least 21 days prior to commencing any pressure testing

(2) Production safety systems used for flow and capture operations, | (i) Meet or exceed the requirements set forth in Subpart H, excluding required equipment that would be installed below the wellhead or that is not applicable to the cap and flow system.

(ii) Have all equipment unique to containment operations available for inspection at all times

(3) Subsea utility equipment, | Have all equipment utilized solely for containment operations available for inspection at all times | Subsea utility equipment includes, but is not limited to: Hydraulic power sources, debris removal, and hydrate control equipment.

(4) Collocated equipment designated by the operator in the Regional Containment Demonstration (RCD) or Well Containment Plan (WCP), | Have equipment available for inspection at all times | Collocated equipment includes, but is not limited to, dispersant injection equipment and other subsea control equipment.

[81 FR 26020, Apr. 29, 2016, as amended at 84 FR 21975, May 15, 2019]

§ 250.463 Who establishes field drilling rules?

(a) The District Manager may establish field drilling rules different from the requirements of this subpart when geological and engineering information shows that specific operating requirements are appropriate. You must comply with field drilling rules and nonconflicting requirements of this subpart. The District Manager may amend or cancel field drilling rules at any time.

(b) You may request the District Manager to establish, amend, or cancel field drilling rules.

93 Applying for a Permit To Modify and Well Records
§ 250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?

(a) You must submit an APM (form BSEE-0124) or an End of Operations Report (form BSEE-0125) and other materials to the Regional Supervisor as shown in the following table. You must also submit a public information copy of each form.

When you . . . | Then you must . . . | And . . .

(1) Intend to revise your drilling plan, change major drilling equipment, or plugback, | Submit form BSEE-0124 or request oral approval, | Receive written or oral approval from the District Manager before you begin the intended operation. If you get an approval, you must submit form BSEE-0124 no later than the end of the 3rd business day following the oral approval. In all cases, or you must meet the additional requirements in paragraph (b) of this section.

(2) Determine a well's final surface location, water depth, and the rotary kelly bushing elevation, | Immediately Submit a form BSEE-0124, | Submit a plat certified by a registered land surveyor that meets the requirements of § 250.412.

(3) Move a drilling unit from a wellbore before completing a well, | Submit forms BSEE-0124 and BSEE-0125 within 30 days after the suspension of wellbore operations, | Submit appropriate copies of the well records.

(b) If you intend to perform any of the actions specified in paragraph (a)(1) of this section, you must meet the following additional requirements:

(1) Your APM (Form BSEE-0124) must contain a detailed statement of the proposed work that would materially change from the approved APD. The submission of your APM must be accompanied by payment of the service fee listed in § 250.125;

(2) Your form BSEE-0124 must include the present status of the well, depth of all casing strings set to date, well depth, present production zones and productive capability, and all other information specified; and

(3) Within 30 days after completing this work, you must submit an End of Operations Report (EOR), Form BSEE-0125, as required under § 250.744.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26021, Apr. 29, 2016]

§§ 250.466-250.469 [Reserved]
94 Additional Arctic OCS Requirements

Source: 81 FR 46561, July 15, 2016, unless otherwise noted.

§ 250.470 What additional information must I submit with my APD for Arctic OCS exploratory drilling operations?

In addition to complying with all other applicable requirements included in this part, you must provide with your APD all of the following information pertaining to your proposed Arctic OCS exploratory drilling:

(a) A detailed description of:

(1) The environmental, meteorological, and oceanic conditions you expect to encounter at the well site(s);

(2) How you will prepare your equipment, materials, and drilling unit for service in the conditions identified in paragraph (a)(1) of this section, and how your drilling unit will be in compliance with the requirements of § 250.713.

(b) A detailed description of all operations necessary in Arctic OCS conditions to transition the rig from being under way to conducting drilling operations and from ending drilling operations to being under way, as well as any anticipated repair and maintenance plans for the drilling unit and equipment. You should include, among other things, a description of how you plan to:

(1) Recover the subsea equipment, including the marine riser and the lower marine riser package;

(2) Recover the BOP;

(3) Recover the auxiliary sub-sea controls and template;

(4) Lay down the drill pipe and secure the drill pipe and marine riser;

(5) Secure the drilling equipment;

(6) Transfer the fluids for transport or disposal;

(7) Secure ancillary equipment like the draw works and lines;

(8) Refuel or transfer fuel;

(9) Offload waste;

(10) Recover the Remotely Operated Vehicles;

(11) Pick up the oil spill prevention booms and equipment; and

(12) Offload the drilling crew.

(c) A description of well-specific drilling objectives, timelines, and updated contingency plans for temporary abandonment of the well, including but not limited to the following:

(1) When you will spud the particular well (i.e., begin drilling operations at the well site) identified in the APD;

(2) How long you will take to drill the well;

(3) Anticipated depths and geologic targets, with timelines;

(4) When you expect to set and cement each string of casing;

(5) When and how you would log the well;

(6) Your plans to test the well;

(7) When and how you intend to abandon the well, including specifically addressing your plans for how to move the rig off location and how you will meet the requirements of § 250.720(c);

(8) A description of what equipment and vessels will be involved in the process of temporarily abandoning the well due to ice; and

(9) An explanation of how you will integrate these elements into your overall program.

(d) A detailed description of your weather and ice forecasting capability for all phases of the drilling operation, including:

(1) How you will ensure your continuous awareness of potential weather and ice hazards at, and during transition between, wells;

(2) Your plans for managing ice hazards and responding to weather events; and

(3) Verification that you have the capabilities described in your BOEM-approved EP.

(e) A detailed description of how you will comply with the requirements of § 250.472.

(f) A statement that you own, or have a contract with a provider for, source control and containment equipment (SCCE), which is capable of controlling and/or containing a worst case discharge, as described in your BOEM-approved EP, when proposing to use a MODU to conduct exploratory drilling operations on the Arctic OCS. The following information must be included in your SCCE submittal:

(1) A detailed description of your or your contractor's SCCE capability to stop or contain flow from an out-of-control well, including your operating assumptions and limitations; your access to and ability to deploy, in accordance with § 250.471, all necessary SCCE; and your ability to evaluate the performance of the well design to determine how you can achieve a full shut-in without having reservoir fluids discharged into the environment;

(2) An inventory of the local and regional SCCE, supplies, and services that you own or for which you have a contract with a provider. You must identify each supplier of such equipment and services and provide their locations and telephone numbers;

(3) Where applicable, proof of contracts or membership agreements with cooperatives, service providers, or other contractors who will provide you with the necessary SCCE or related supplies and services if you do not possess them. The contract or membership agreement must include provisions for ensuring the availability of the personnel and/or equipment on a 24-hour per day basis while you are drilling below or working below the surface casing;

(4) A detailed description of the procedures you plan to use to inspect, test, and maintain your SCCE; and

(5) A detailed description of your plan to ensure that all members of your operating team, who are responsible for operating the SCCE, have received the necessary training to deploy and operate such equipment in Arctic OCS conditions and demonstrate ongoing proficiency in source control operations. You must also identify and include the dates of prior and planned training.

(g) Where it does not conflict with other requirements of this subpart, and except as provided in paragraphs (g)(1) through (11) of this section, you must comply with the requirements of ANSI/API Recommended Practice 2N (incorporated by reference, see § 250.198), and provide a detailed description of how you will utilize the best practices included in ANSI/API Recommended Practice 2N during your exploratory drilling operations. You are not required to incorporate the following sections of ANSI/API Recommended Practice 2N into your drilling operations:

(1) Sections 6.6.3 through 6.6.4;

(2) The foundation recommendations in Section 8.4;

(3) Section 9.6;

(4) The recommendations for permanently moored systems in Section 9.7;

(5) The recommendations for pile foundations in Section 9.10;

(6) Section 12;

(7) Section 13.2.1;

(8) Sections 13.8.1.1, 13.8.2.1, 13.8.2.2, 13.8.2.4 through 13.8.2.7;

(9) Sections 13.9.1, 13.9.2, 13.9.4 through 13.9.8;

(10) Sections 14 through 16; and

(11) Section 18.

[81 FR 46561, July 15, 2016, as amended at 91 FR 35351, June 10, 2026]

§ 250.471 What are the requirements for Arctic OCS source control and containment?

You must meet the following requirements for all exploration wells drilled on the Arctic OCS:

(a) If you use a MODU when drilling below or working below the surface casing, you must have access to the following SCCE capable of stopping or capturing the flow of an out-of-control well:

(1) A capping stack, positioned to ensure that it will arrive at the well location within 24 hours after a loss of well control and can be deployed as directed by the Regional Supervisor pursuant to paragraph (h) of this section;

(2) A cap and flow system, positioned to ensure that it will arrive at the well location within 7 days after a loss of well control and can be deployed as directed by the Regional Supervisor pursuant to paragraph (h) of this section. The cap and flow system must be designed to capture at least the amount of hydrocarbons equivalent to the calculated worst case discharge rate referenced in your BOEM-approved EP; and

(3) A containment dome, positioned to ensure that it will arrive at the well location within 7 days after a loss of well control and can be deployed as directed by the Regional Supervisor pursuant to paragraph (h) of this section. The containment dome must have the capacity to pump fluids without relying on buoyancy.

(b) You must conduct a monthly stump test of dry-stored capping stacks. If you use a pre-positioned capping stack, you must conduct a stump test prior to each installation on each well.

(c) As required by § 250.465(a), if you propose to change your well design, you must submit an APM. For Arctic OCS operations, your APM must include a reevaluation of your SCCE capabilities for any new Worst Case Discharge (WCD) rate, and a demonstration that your SCCE capabilities will meet the criteria in § 250.470(f) under the changed well design.

(d) You must conduct tests or exercises of your SCCE, including deployment of your SCCE, when directed by the Regional Supervisor.

(e) You must maintain records pertaining to testing, inspection, and maintenance of your SCCE for at least 10 years and make the records available to any authorized BSEE representative upon request.

(f) You must maintain records pertaining to the use of your SCCE during testing, training, and deployment activities for at least 3 years and make the records available to any authorized BSEE representative upon request.

(g) Upon a loss of well control, you must initiate transit of all SCCE identified in paragraph (a) of this section to the well.

(h) You must deploy and use SCCE when directed by the Regional Supervisor.

(i) Operators may request approval of alternate procedures or equipment to the SCCE requirements of subparagraph (a) of this section in accordance with § 250.141. The operator must show and document that the alternate procedures or equipment will provide a level of safety and environmental protection that will meet or exceed the level of safety and environmental protection required by BSEE regulations, including demonstrating that the alternate procedures or equipment will be capable of stopping or capturing the flow of an out-of-control well.

§ 250.472 What are the relief rig requirements for the Arctic OCS?

(a) In the event of a loss of well control, the Regional Supervisor may direct you to drill a relief well using the relief rig able to kill and permanently plug an out-of-control well as described in your APD. Your relief rig must comply with all other requirements of this part pertaining to drill rig characteristics and capabilities, and it must be able to drill a relief well under anticipated Arctic OCS conditions.

(b) When you are drilling below or working below the surface casing during Arctic OCS exploratory drilling operations, you must have access to a relief rig, different from your primary drilling rig, staged in a location such that it can arrive on site, drill a relief well, kill and abandon the original well, and abandon the relief well prior to expected seasonal ice encroachment at the drill site, but no later than 45 days after the loss of well control.

(c) Operators may request approval of alternative compliance measures to the relief rig requirement in accordance with § 250.141. The operator must show and document that the alternate compliance measure will meet or exceed the level of safety and environmental protection required by BSEE regulations, including demonstrating that the alternate compliance measure will be able to kill and permanently plug an out-of-control well.

§ 250.473 What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS?

In addition to the requirements set forth in § 250.107, when conducting exploratory drilling operations on the Arctic OCS, you must protect health, safety, property, and the environment by using the following:

(a) Equipment and materials that are rated or de-rated for service under conditions that can be reasonably expected during your operations; and

(b) Measures to address human factors associated with weather conditions that can be reasonably expected during your operations including, but not limited to, provision of proper attire and equipment, construction of protected work spaces, and management of shifts.

95 Hydrogen Sulfide
§ 250.490 Hydrogen sulfide.

(a) What precautions must I take when operating in an H2S area? You must:

(1) Take all necessary and feasible precautions and measures to protect personnel from the toxic effects of H2S and to mitigate damage to property and the environment caused by H2S. You must follow the requirements of this section when conducting drilling, well-completion/well-workover, and production operations in zones with H2S present and when conducting operations in zones where the presence of H2S is unknown. You do not need to follow these requirements when operating in zones where the absence of H2S has been confirmed; and

(2) Follow your approved contingency plan.

(b) Definitions. Terms used in this section have the following meanings:

Facility means a vessel, a structure, or an artificial island used for drilling, well-completion, well-workover, and/or production operations.

H2S absent means:

(1) Drilling, logging, coring, testing, or producing operations have confirmed the absence of H2S in concentrations that could potentially result in atmospheric concentrations of 20 ppm or more of H2S; or

(2) Drilling in the surrounding areas and correlation of geological and seismic data with equivalent stratigraphic units have confirmed an absence of H2S throughout the area to be drilled.

H2S present means that drilling, logging, coring, testing, or producing operations have confirmed the presence of H2S in concentrations and volumes that could potentially result in atmospheric concentrations of 20 ppm or more of H2S.

H2S unknown means the designation of a zone or geologic formation where neither the presence nor absence of H2S has been confirmed.

Well-control fluid means drilling mud and completion or workover fluid as appropriate to the particular operation being conducted.

(c) Classifying an area for the presence of H2S. You must:

(1) Request and obtain an approved classification for the area from the Regional Supervisor before you begin operations. Classifications are “H2S absent,” H2S present,” or “H2S unknown”;

(2) Submit your request with your application for permit to drill;

(3) Support your request with available information such as geologic and geophysical data and correlations, well logs, formation tests, cores and analysis of formation fluids; and

(4) Submit a request for reclassification of a zone when additional data indicate a different classification is needed.

(d) What do I do if conditions change? If you encounter H2S that could potentially result in atmospheric concentrations of 20 ppm or more in areas not previously classified as having H2S present, you must immediately notify BSEE and begin to follow requirements for areas with H2S present.

(e) What are the requirements for conducting simultaneous operations? When conducting any combination of drilling, well-completion, well-workover, and production operations simultaneously, you must follow the requirements in the section applicable to each individual operation.

(f) Requirements for submitting an H2S Contingency Plan. Before you begin operations, you must submit an H2S Contingency Plan to the District Manager for approval. Do not begin operations before the District Manager approves your plan. You must keep a copy of the approved plan in the field, and you must follow the plan at all times. Your plan must include:

(1) Safety procedures and rules that you will follow concerning equipment, drills, and smoking;

(2) Training you provide for employees, contractors, and visitors;

(3) Job position and title of the person responsible for the overall safety of personnel;

(4) Other key positions, how these positions fit into your organization, and what the functions, duties, and responsibilities of those job positions are;

(5) Actions that you will take when the concentration of H2S in the atmosphere reaches 20 ppm, who will be responsible for those actions, and a description of the audible and visual alarms to be activated;

(6) Briefing areas where personnel will assemble during an H2S alert. You must have at least two briefing areas on each facility and use the briefing area that is upwind of the H2S source at any given time;

(7) Criteria you will use to decide when to evacuate the facility and procedures you will use to safely evacuate all personnel from the facility by vessel, capsule, or lifeboat. If you use helicopters during H2S alerts, describe the types of H2S emergencies during which you consider the risk of helicopter activity to be acceptable and the precautions you will take during the flights;

(8) Procedures you will use to safely position all vessels attendant to the facility. Indicate where you will locate the vessels with respect to wind direction. Include the distance from the facility and what procedures you will use to safely relocate the vessels in an emergency;

(9) How you will provide protective-breathing equipment for all personnel, including contractors and visitors;

(10) The agencies and facilities you will notify in case of a release of H2S (that constitutes an emergency), how you will notify them, and their telephone numbers. Include all facilities that might be exposed to atmospheric concentrations of 20 ppm or more of H2S;

(11) The medical personnel and facilities you will use if needed, their addresses, and telephone numbers;

(12) H2S detector locations in production facilities producing gas containing 20 ppm or more of H2S. Include an “H2S Detector Location Drawing” showing:

(i) All vessels, flare outlets, wellheads, and other equipment handling production containing H2S;

(ii) Approximate maximum concentration of H2S in the gas stream; and

(iii) Location of all H2S sensors included in your contingency plan;

(13) Operational conditions when you expect to flare gas containing H2S including the estimated maximum gas flow rate, H2S concentration, and duration of flaring;

(14) Your assessment of the risks to personnel during flaring and what precautionary measures you will take;

(15) Primary and alternate methods to ignite the flare and procedures for sustaining ignition and monitoring the status of the flare (i.e., ignited or extinguished);

(16) Procedures to shut off the gas to the flare in the event the flare is extinguished;

(17) Portable or fixed sulphur dioxide (SO2)-detection system(s) you will use to determine SO2 concentration and exposure hazard when H2S is burned;

(18) Increased monitoring and warning procedures you will take when the SO2 concentration in the atmosphere reaches 2 ppm;

(19) Personnel protection measures or evacuation procedures you will initiate when the SO2 concentration in the atmosphere reaches 5 ppm;

(20) Engineering controls to protect personnel from SO2; and

(21) Any special equipment, procedures, or precautions you will use if you conduct any combination of drilling, well-completion, well-workover, and production operations simultaneously.

(g) Training program:

(1) When and how often do employees need to be trained? All operators and contract personnel must complete an H2S training program to meet the requirements of this section:

(i) Before beginning work at the facility; and

(ii) Each year, within 1 year after completion of the previous class.

(2) What training documentation do I need? For each individual working on the platform, either:

(i) You must have documentation of this training at the facility where the individual is employed; or

(ii) The employee must carry a training completion card.

(3) What training do I need to give to visitors and employees previously trained on another facility? (i) Trained employees or contractors transferred from another facility must attend a supplemental briefing on your H2S equipment and procedures before beginning duty at your facility;

(ii) Visitors who will remain on your facility more than 24 hours must receive the training required for employees by paragraph (g)(4) of this section; and

(iii) Visitors who will depart before spending 24 hours on the facility are exempt from the training required for employees, but they must, upon arrival, complete a briefing that includes:

(A) Information on the location and use of an assigned respirator; practice in donning and adjusting the assigned respirator; information on the safe briefing areas, alarm system, and hazards of H2S and SO2; and

(B) Instructions on their responsibilities in the event of an H2S release.

(4) What training must I provide to all other employees? You must train all individuals on your facility on the:

(i) Hazards of H2S and of SO2 and the provisions for personnel safety contained in the H2S Contingency Plan;

(ii) Proper use of safety equipment which the employee may be required to use;

(iii) Location of protective breathing equipment, H2S detectors and alarms, ventilation equipment, briefing areas, warning systems, evacuation procedures, and the direction of prevailing winds;

(iv) Restrictions and corrective measures concerning beards, spectacles, and contact lenses in conformance with ANSI Z88.2, American National Standard for Respiratory Protection (as specified in § 250.198);

(v) Basic first-aid procedures applicable to victims of H2S exposure. During all drills and training sessions, you must address procedures for rescue and first aid for H2S victims;

(vi) Location of:

(A) The first-aid kit on the facility;

(B) Resuscitators; and

(C) Litter or other device on the facility.

(vii) Meaning of all warning signals.

(5) Do I need to post safety information? You must prominently post safety information on the facility and on vessels serving the facility (i.e., basic first-aid, escape routes, instructions for use of life boats, etc.).

(h) Drills—(1) When and how often do I need to conduct drills on H2S safety discussions on the facility? You must:

(i) Conduct a drill for each person at the facility during normal duty hours at least once every 7-day period. The drills must consist of a dry-run performance of personnel activities related to assigned jobs.

(ii) At a safety meeting or other meetings of all personnel, discuss drill performance, new H2S considerations at the facility, and other updated H2S information at least monthly.

(2) What documentation do I need? You must keep records of attendance for:

(i) Drilling, well-completion, and well-workover operations at the facility until operations are completed; and

(ii) Production operations at the facility or at the nearest field office for 1 year.

(i) Visual and audible warning systems:

(1) How must I install wind direction equipment? You must install wind-direction equipment in a location visible at all times to individuals on or in the immediate vicinity of the facility.

(2) When do I need to display operational danger signs, display flags, or activate visual or audible alarms?

(i) You must display warning signs at all times on facilities with wells capable of producing H2S and on facilities that process gas containing H2S in concentrations of 20 ppm or more.

(ii) In addition to the signs, you must activate audible alarms and display flags or activate flashing red lights when atmospheric concentration of H2S reaches 20 ppm.

(3) What are the requirements for signs? Each sign must be a high-visibility yellow color with black lettering as follows:

Letter height | Wording

12 inches | Danger.

Poisonous Gas.

Hydrogen Sulfide.

7 inches | Do not approach if red flag is flying.

(Use appropriate wording at right) | Do not approach if red lights are flashing.

(4) May I use existing signs? You may use existing signs containing the words “Danger-Hydrogen Sulfide-H2S,” provided the words “Poisonous Gas. Do Not Approach if Red Flag is Flying” or “Red Lights are Flashing” in lettering of a minimum of 7 inches in height are displayed on a sign immediately adjacent to the existing sign.

(5) What are the requirements for flashing lights or flags? You must activate a sufficient number of lights or hoist a sufficient number of flags to be visible to vessels and aircraft. Each light must be of sufficient intensity to be seen by approaching vessels or aircraft any time it is activated (day or night). Each flag must be red, rectangular, a minimum width of 3 feet, and a minimum height of 2 feet.

(6) What is an audible warning system? An audible warning system is a public address system or siren, horn, or other similar warning device with a unique sound used only for H2S.

(7) Are there any other requirements for visual or audible warning devices? Yes, you must:

(i) Illuminate all signs and flags at night and under conditions of poor visibility; and

(ii) Use warning devices that are suitable for the electrical classification of the area.

(8) What actions must I take when the alarms are activated? When the warning devices are activated, the designated responsible persons must inform personnel of the level of danger and issue instructions on the initiation of appropriate protective measures.

(j) H2S-detection and H2S monitoring equipment:

(1) What are the requirements for an H2S detection system? An H2S detection system must:

(i) Be capable of sensing a minimum of 10 ppm of H2S in the atmosphere; and

(ii) Activate audible and visual alarms when the concentration of H2S in the atmosphere reaches 20 ppm.

(2) Where must I have sensors for drilling, well-completion, and well-workover operations? You must locate sensors at the:

(i) Bell nipple;

(ii) Mud-return line receiver tank (possum belly);

(iii) Pipe-trip tank;

(iv) Shale shaker;

(v) Well-control fluid pit area;

(vi) Driller's station;

(vii) Living quarters; and

(viii) All other areas where H2S may accumulate.

(3) Do I need mud sensors? The District Manager may require mud sensors in the possum belly in cases where the ambient air sensors in the mud-return system do not consistently detect the presence of H2S.

(4) How often must I observe the sensors? During drilling, well-completion and well-workover operations, you must continuously observe the H2S levels indicated by the monitors in the work areas during the following operations:

(i) When you pull a wet string of drill pipe or workover string;

(ii) When circulating bottoms-up after a drilling break;

(iii) During cementing operations;

(iv) During logging operations; and

(v) When circulating to condition mud or other well-control fluid.

(5) Where must I have sensors for production operations? On a platform where gas containing H2S of 20 ppm or greater is produced, processed, or otherwise handled:

(i) You must have a sensor in rooms, buildings, deck areas, or low-laying deck areas not otherwise covered by paragraph (j)(2) of this section, where atmospheric concentrations of H2S could reach 20 ppm or more. You must have at least one sensor per 400 square feet of deck area or fractional part of 400 square feet;

(ii) You must have a sensor in buildings where personnel have their living quarters;

(iii) You must have a sensor within 10 feet of each vessel, compressor, wellhead, manifold, or pump, which could release enough H2S to result in atmospheric concentrations of 20 ppm at a distance of 10 feet from the component;

(iv) You may use one sensor to detect H2S around multiple pieces of equipment, provided the sensor is located no more than 10 feet from each piece, except that you need to use at least two sensors to monitor compressors exceeding 50 horsepower;

(v) You do not need to have sensors near wells that are shut in at the master valve and sealed closed;

(vi) When you determine where to place sensors, you must consider:

(A) The location of system fittings, flanges, valves, and other devices subject to leaks to the atmosphere; and

(B) Design factors, such as the type of decking and the location of fire walls; and

(vii) The District Manager may require additional sensors or other monitoring capabilities, if warranted by site specific conditions.

(6) How must I functionally test the H2S Detectors? (i) Personnel trained to calibrate the particular H2S detector equipment being used must test detectors by exposing them to a known concentration in the range of 10 to 30 ppm of H2S.

(ii) If the results of any functional test are not within 2 ppm or 10 percent, whichever is greater, of the applied concentration, recalibrate the instrument.

(7) How often must I test my detectors? (i) When conducting drilling, drill stem testing, well-completion, or well-workover operations in areas classified as H2S present or H2S unknown, test all detectors at least once every 24 hours. When drilling, begin functional testing before the bit is 1,500 feet (vertically) above the potential H2S zone.

(ii) When conducting production operations, test all detectors at least every 14 days between tests.

(iii) If equipment requires calibration as a result of two consecutive functional tests, the District Manager may require that H2S-detection and H2S-monitoring equipment be functionally tested and calibrated more frequently.

(8) What documentation must I keep? (i) You must maintain records of testing and calibrations (in the drilling or production operations report, as applicable) at the facility to show the present status and history of each device, including dates and details concerning:

(A) Installation;

(B) Removal;

(C) Inspection;

(D) Repairs;

(E) Adjustments; and

(F) Reinstallation.

(ii) Records must be available for inspection by BSEE personnel.

(9) What are the requirements for nearby vessels? If vessels are stationed overnight alongside facilities in areas of H2S present or H2S unknown, you must equip vessels with an H2S-detection system that activates audible and visual alarms when the concentration of H2S in the atmosphere reaches 20 ppm. This requirement does not apply to vessels positioned upwind and at a safe distance from the facility in accordance with the positioning procedure described in the approved H2S Contingency Plan.

(10) What are the requirements for nearby facilities? The District Manager may require you to equip nearby facilities with portable or fixed H2S detector(s) and to test and calibrate those detectors. To invoke this requirement, the District Manager will consider dispersion modeling results from a possible release to determine if 20 ppm H2S concentration levels could be exceeded at nearby facilities.

(11) What must I do to protect against SO2 if I burn gas containing H2S? You must:

(i) Monitor the SO2concentration in the air with portable or strategically placed fixed devices capable of detecting a minimum of 2 ppm of SO2;

(ii) Take readings at least hourly and at any time personnel detect SO2 odor or nasal irritation;

(iii) Implement the personnel protective measures specified in the H2S Contingency Plan if the SO2 concentration in the work area reaches 2 ppm; and

(iv) Calibrate devices every 3 months if you use fixed or portable electronic sensing devices to detect SO2.

(12) May I use alternative measures? You may follow alternative measures instead of those in paragraph (j)(11) of this section if you propose and the Regional Supervisor approves the alternative measures.

(13) What are the requirements for protective-breathing equipment? In an area classified as H2S present or H2S unknown, you must:

(i) Provide all personnel, including contractors and visitors on a facility, with immediate access to self-contained pressure-demand-type respirators with hoseline capability and breathing time of at least 15 minutes.

(ii) Design, select, use, and maintain respirators in conformance with ANSI Z88.2 (as specified in § 250.198).

(iii) Make available at least two voice-transmission devices, which can be used while wearing a respirator, for use by designated personnel.

(iv) Make spectacle kits available as needed.

(v) Store protective-breathing equipment in a location that is quickly and easily accessible to all personnel.

(vi) Label all breathing-air bottles as containing breathing-quality air for human use.

(vii) Ensure that vessels attendant to facilities carry appropriate protective-breathing equipment for each crew member. The District Manager may require additional protective-breathing equipment on certain vessels attendant to the facility.

(viii) During H2S alerts, limit helicopter flights to and from facilities to the conditions specified in the H2S Contingency Plan. During authorized flights, the flight crew and passengers must use pressure-demand-type respirators. You must train all members of flight crews in the use of the particular type(s) of respirator equipment made available.

(ix) As appropriate to the particular operation(s), (production, drilling, well-completion or well-workover operations, or any combination of them), provide a system of breathing-air manifolds, hoses, and masks at the facility and the briefing areas. You must provide a cascade air-bottle system for the breathing-air manifolds to refill individual protective-breathing apparatus bottles. The cascade air-bottle system may be recharged by a high-pressure compressor suitable for providing breathing-quality air, provided the compressor suction is located in an uncontaminated atmosphere.

(k) Personnel safety equipment:

(1) What additional personnel-safety equipment do I need? You must ensure that your facility has:

(i) Portable H2S detectors capable of detecting a 10 ppm concentration of H2S in the air available for use by all personnel;

(ii) Retrieval ropes with safety harnesses to retrieve incapacitated personnel from contaminated areas;

(iii) Chalkboards and/or note pads for communication purposes located on the rig floor, shale-shaker area, the cement-pump rooms, well-bay areas, production processing equipment area, gas compressor area, and pipeline-pump area;

(iv) Bull horns and flashing lights; and

(v) At least three resuscitators on manned facilities, and a number equal to the personnel on board, not to exceed three, on normally unmanned facilities, complete with face masks, oxygen bottles, and spare oxygen bottles.

(2) What are the requirements for ventilation equipment? You must:

(i) Use only explosion-proof ventilation devices;

(ii) Install ventilation devices in areas where H2S or SO2 may accumulate; and

(iii) Provide movable ventilation devices in work areas. The movable ventilation devices must be multidirectional and capable of dispersing H2S or SO2 vapors away from working personnel.

(3) What other personnel safety equipment do I need? You must have the following equipment readily available on each facility:

(i) A first-aid kit of appropriate size and content for the number of personnel on the facility; and

(ii) At least one litter or an equivalent device.

(l) Do I need to notify BSEE in the event of an H2S release? You must notify BSEE without delay in the event of a gas release which results in a 15-minute time-weighted average atmospheric concentration of H2S of 20 ppm or more anywhere on the OCS facility. You must report these gas releases to the District Manager immediately by oral communication, with a written follow-up report within 15 days, pursuant to §§ 250.188 through 250.190.

(m) Do I need to use special drilling, completion and workover fluids or procedures? When working in an area classified as H2S present or H2S unknown:

(1) You may use either water- or oil-base muds in accordance with § 250.300(b)(1).

(2) If you use water-base well-control fluids, and if ambient air sensors detect H2S, you must immediately conduct either the Garrett-Gas-Train test or a comparable test for soluble sulfides to confirm the presence of H2S.

(3) If the concentration detected by air sensors in over 20 ppm, personnel conducting the tests must don protective-breathing equipment conforming to paragraph (j)(13) of this section.

(4) You must maintain on the facility sufficient quantities of additives for the control of H2S, well-control fluid pH, and corrosion equipment.

(i) Scavengers. You must have scavengers for control of H2S available on the facility. When H2S is detected, you must add scavengers as needed. You must suspend drilling until the scavenger is circulated throughout the system.

(ii) Control pH. You must add additives for the control of pH to water-base well-control fluids in sufficient quantities to maintain pH of at least 10.0.

(iii) Corrosion inhibitors. You must add additives to the well-control fluid system as needed for the control of corrosion.

(5) You must degas well-control fluids containing H2S at the optimum location for the particular facility. You must collect the gases removed and burn them in a closed flare system conforming to paragraph (q)(6) of this section.

(n) What must I do in the event of a kick? In the event of a kick, you must use one of the following alternatives to dispose of the well-influx fluids giving consideration to personnel safety, possible environmental damage, and possible facility well-equipment damage:

(1) Contain the well-fluid influx by shutting in the well and pumping the fluids back into the formation.

(2) Control the kick by using appropriate well-control techniques to prevent formation fracturing in an open hole within the pressure limits of the well equipment (drill pipe, work string, casing, wellhead, BOP system, and related equipment). The disposal of H2S and other gases must be through pressurized or atmospheric mud-separator equipment depending on volume, pressure and concentration of H2S. The equipment must be designed to recover well-control fluids and burn the gases separated from the well-control fluid. The well-control fluid must be treated to neutralize H2S and restore and maintain the proper quality.

(o) Well testing in a zone known to contain H2S. When testing a well in a zone with H2S present, you must do all of the following:

(1) Before starting a well test, conduct safety meetings for all personnel who will be on the facility during the test. At the meetings, emphasize the use of protective-breathing equipment, first-aid procedures, and the Contingency Plan. Only competent personnel who are trained and are knowledgeable of the hazardous effects of H2S must be engaged in these tests.

(2) Perform well testing with the minimum number of personnel in the immediate vicinity of the rig floor and with the appropriate test equipment to safely and adequately perform the test. During the test, you must continuously monitor H2S levels.

(3) Not burn produced gases except through a flare which meets the requirements of paragraph (q)(6) of this section. Before flaring gas containing H2S, you must activate SO2 monitoring equipment in accordance with paragraph (j)(11) of this section. If you detect SO2 in excess of 2 ppm, you must implement the personnel protective measures in your H2S Contingency Plan, required by paragraph (f) of this section. You must also follow the requirements of § 250.1164. You must pipe gases from stored test fluids into the flare outlet and burn them.

(4) Use downhole test tools and wellhead equipment suitable for H2S service.

(5) Use tubulars suitable for H2S service. You must not use drill pipe for well testing without the prior approval of the District Manager. Water cushions must be thoroughly inhibited in order to prevent H2S attack on metals. You must flush the test string fluid treated for this purpose after completion of the test.

(6) Use surface test units and related equipment that is designed for H2S service.

(p) Metallurgical properties of equipment. When operating in a zone with H2S present or when the concentration of H2S in the produced fluid may exceed 0.05 psi partial pressure of H2S, you must use equipment that is constructed of materials with metallurgical properties that resist or prevent sulfide stress cracking (also known as hydrogen embrittlement, stress corrosion cracking, or H2S embrittlement), chloride-stress cracking, hydrogen-induced cracking, and other failure modes. You must do all of the following:

(1) Use tubulars and other equipment, casing, tubing, drill pipe, couplings, flanges, and related equipment that is designed for H2S service.

(2) Use BOP system components, wellhead, pressure-control equipment, and related equipment exposed to H2S-bearing fluids in conformance with NACE Standard MR0175-03 (as specified in § 250.198).

(3) Use temporary downhole well-security devices such as retrievable packers and bridge plugs that are designed for H2S service.

(4) When producing in zones bearing H2S, use equipment constructed of materials capable of resisting or preventing sulfide stress cracking.

(5) Keep the use of welding to a minimum during the installation or modification of a production facility. Welding must be done in a manner that ensures resistance to sulfide stress cracking.

(q) General requirements when operating in an H2S zone:

(1) Coring operations. When you conduct coring operations in H2S-bearing zones, all personnel in the working area must wear protective-breathing equipment at least 10 stands in advance of retrieving the core barrel. Cores to be transported must be sealed and marked for the presence of H2S.

(2) Logging operations. You must treat and condition well-control fluid in use for logging operations to minimize the effects of H2S on the logging equipment.

(3) Stripping operations. Personnel must monitor displaced well-control fluid returns and wear protective-breathing equipment in the working area when the atmospheric concentration of H2S reaches 20 ppm or if the well is under pressure.

(4) Gas-cut well-control fluid or well kick from H2S-bearing zone. If you decide to circulate out a kick, personnel in the working area during bottoms-up and extended-kill operations must wear protective-breathing equipment.

(5) Drill- and workover-string design and precautions. Drill- and workover-strings must be designed consistent with the anticipated depth, conditions of the hole, and reservoir environment to be encountered. You must minimize exposure of the drill- or workover-string to high stresses as much as practical and consistent with well conditions. Proper handling techniques must be taken to minimize notching and stress concentrations. Precautions must be taken to minimize stresses caused by doglegs, improper stiffness ratios, improper torque, whip, abrasive wear on tool joints, and joint imbalance.

(6) Flare system. The flare outlet must be of a diameter that allows easy nonrestricted flow of gas. You must locate flare line outlets on the downside of the facility and as far from the facility as is feasible, taking into account the prevailing wind directions, the wake effects caused by the facility and adjacent structure(s), and the height of all such facilities and structures. You must equip the flare outlet with an automatic ignition system including a pilot-light gas source or an equivalent system. You must have alternate methods for igniting the flare. You must pipe to the flare system used for H2S all vents from production process equipment, tanks, relief valves, burst plates, and similar devices.

(7) Corrosion mitigation. You must use effective means of monitoring and controlling corrosion caused by acid gases (H2S and CO2) in both the downhole and surface portions of a production system. You must take specific corrosion monitoring and mitigating measures in areas of unusually severe corrosion where accumulation of water and/or higher concentration of H2S exists.

(8) Wireline lubricators. Lubricators which may be exposed to fluids containing H2S must be of H2S-resistant materials.

(9) Fuel and/or instrument gas. You must not use gas containing H2S for instrument gas. You must not use gas containing H2S for fuel gas without the prior approval of the District Manager.

(10) Sensing lines and devices. Metals used for sensing line and safety-control devices which are necessarily exposed to H2S-bearing fluids must be constructed of H2S-corrosion resistant materials or coated so as to resist H2S corrosion.

(11) Elastomer seals. You must use H2S-resistant materials for all seals which may be exposed to fluids containing H2S.

(12) Water disposal. If you dispose of produced water by means other than subsurface injection, you must submit to the District Manager an analysis of the anticipated H2S content of the water at the final treatment vessel and at the discharge point. The District Manager may require that the water be treated for removal of H2S. The District Manager may require the submittal of an updated analysis if the water disposal rate or the potential H2S content increases.

(13) Deck drains. You must equip open deck drains with traps or similar devices to prevent the escape of H2S gas into the atmosphere.

(14) Sealed voids. You must take precautions to eliminate sealed spaces in piping designs (e.g., slip-on flanges, reinforcing pads) which can be invaded by atomic hydrogen when H2S is present.

[76 FR 64462, Oct. 18, 2011, as amended at 89 FR 71120, Aug. 30, 2024]

Subpart E Oil and Gas Well-Completion Operations
§ 250.500 General requirements.

Well-completion operations must be conducted in a manner to protect against harm or damage to life (including fish and other aquatic life), property, natural resources of the OCS, including any mineral deposits (in areas leased and not leased), the National security or defense, or the marine, coastal, or human environment. In addition to the requirements of this subpart, you must also follow the applicable requirements of subpart G of this part.

[81 FR 26021, Apr. 29, 2016]

§ 250.501 Definition.

When used in this subpart, the following term shall have the meaning given below:

Well-completion operations means the work conducted to establish the production of a well after the production-casing string has been set, cemented, and pressure-tested.

§ 250.502 [Reserved]
§ 250.503 Emergency shutdown system.

When well-completion operations are conducted on a platform where there are other hydrocarbon-producing wells or other hydrocarbon flow, an emergency shutdown system (ESD) manually controlled station shall be installed near the driller's console or well-servicing unit operator's work station.

§ 250.504 Hydrogen sulfide.

When a well-completion operation is conducted in zones known to contain hydrogen sulfide (H2S) or in zones where the presence of H2S is unknown (as defined in § 250.490 of this part), the lessee shall take appropriate precautions to protect life and property on the platform or completion unit, including, but not limited to operations such as blowing the well down, dismantling wellhead equipment and flow lines, circulating the well, swabbing, and pulling tubing, pumps, and packers. The lessee shall comply with the requirements in § 250.490 of this part as well as the appropriate requirements of this subpart.

§ 250.505 Subsea completions.

No subsea well completion shall be commenced until the lessee obtains written approval from the District Manager in accordance with § 250.513 of this part. That approval shall be based upon a case-by-case determination that the proposed equipment and procedures will adequately control the well and permit safe production operations.

§§ 250.506-250.508 [Reserved]
§ 250.509 Well-completion structures on fixed platforms.

Derricks, masts, substructures, and related equipment shall be selected, designed, installed, used, and maintained so as to be adequate for the potential loads and conditions of loading that may be encountered during the proposed operations. Prior to moving a well-completion rig or equipment onto a platform, the lessee shall determine the structural capability of the platform to safely support the equipment and proposed operations, taking into consideration the corrosion protection, age of platform, and previous stresses to the platform.

§ 250.510 Diesel engine air intakes.

Diesel engine air intakes must be equipped with a device to shut down the diesel engine in the event of runaway. Diesel engines that are continuously attended must be equipped with either remote operated manual or automatic-shutdown devices. Diesel engines that are not continuously attended must be equipped with automatic-shutdown devices.

§ 250.511 Traveling-block safety device.

All units being used for well-completion operations that have both a traveling block and a crown block must be equipped with a safety device that is designed to prevent the traveling block from striking the crown block. The device must be checked for proper operation weekly and after each drill-line slipping operation. The results of the operational check must be entered in the operations log.

§ 250.512 Field well-completion rules.

When geological and engineering information available in a field enables the District Manager to determine specific operating requirements, field well-completion rules may be established on the District Manager's initiative or in response to a request from a lessee. Such rules may modify the specific requirements of this subpart. After field well-completion rules have been established, well-completion operations in the field shall be conducted in accordance with such rules and other requirements of this subpart. Field well-completion rules may be amended or canceled for cause at any time upon the initiative of the District Manager or upon the request of a lessee.

§ 250.513 Approval and reporting of well-completion operations.

(a) No well-completion operation may begin until the lessee receives written approval from the District Manager. If completion is planned and the data are available at the time you submit the Application for Permit to Drill and Supplemental APD Information Sheet (Forms BSEE-0123 and BSEE-0123S), you may request approval for a well-completion on those forms (see §§ 250.410 through 250.418 of this part). If the District Manager has not approved the completion or if the completion objective or plans have significantly changed, you must submit an Application for Permit to Modify (Form BSEE-0124) for approval of such operations.

(b) You must submit the following with Form BSEE-0124 (or with Form BSEE-0123; Form BSEE-0123S):

(1) A brief description of the well-completion procedures to be followed, a statement of the expected surface pressure, and type and weight of completion fluids;

(2) A schematic drawing of the well showing the proposed producing zone(s) and the subsurface well-completion equipment to be used;

(3) For multiple completions, a partial electric log showing the zones proposed for completion, if logs have not been previously submitted;

(4) All applicable information required in § 250.731.

(5) When the well-completion is in a zone known to contain H2S or a zone where the presence of H2S is unknown, information pursuant to § 250.490 of this part; and

(6) Payment of the service fee listed in § 250.125.

(c) Within 30 days after completion, you must submit to the District Manager an End of Operations Report (Form BSEE-0125), including a schematic of the tubing and subsurface equipment.

(d) You must submit public information copies of Form BSEE-0125 according to § 250.186.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50894, Aug. 22, 2012; 81 FR 26021, Apr. 29, 2016]

§ 250.514 Well-control fluids, equipment, and operations.

(a) Well-control fluids, equipment, and operations shall be designed, utilized, maintained, and/or tested as necessary to control the well in foreseeable conditions and circumstances, including subfreezing conditions. The well shall be continuously monitored during well-completion operations and shall not be left unattended at any time unless the well is shut in and secured.

(b) The following well-control-fluid equipment shall be installed, maintained, and utilized:

(1) A fill-up line above the uppermost BOP;

(2) A well-control, fluid-volume measuring device for determining fluid volumes when filling the hole on trips; and

(3) A recording mud-pit-level indicator to determine mud-pit-volume gains and losses. This indicator shall include both a visual and an audible warning device.

(c) When coming out of the hole with drill pipe, the annulus shall be filled with well-control fluid before the change in such fluid level decreases the hydrostatic pressure 75 pounds per square inch (psi) or every five stands of drill pipe, whichever gives a lower decrease in hydrostatic pressure. The number of stands of drill pipe and drill collars that may be pulled prior to filling the hole and the equivalent well-control fluid volume shall be calculated and posted near the operator's station. A mechanical, volumetric, or electronic device for measuring the amount of well-control fluid required to fill the hole shall be utilized.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50894, Aug. 22, 2012; 81 FR 26021, Apr. 29, 2016]

§§ 250.515-250.517 [Reserved]
§ 250.518 Tubing and wellhead equipment.

(a) No tubing string may be placed in service or continue to be used unless such tubing string has the necessary strength and pressure integrity and is otherwise suitable for its intended use.

(1) The tubing string must be evaluated for burst, collapse, and axial loads with appropriate safety factors and material design factors for the pressure and temperature environments of the completion, production, shut-in, and injection load cases.

(2) The tubing string materials must be appropriate for the environment. You must follow NACE Standard MR0175-2003 (incorporated by reference, see § 250.198) when H2S concentration may equal or exceed 0.05 psi partial pressure.

(3) The tubing string threaded connectors must be appropriate for the loads identified in paragraph (a)(1) of this section.

(b) When the tree is installed, you must equip wells to monitor for casing pressure according to the following chart:

If you . . . | you must equip . . . | so you can monitor . . .

(1) fixed platform wells, | the wellhead, | all annuli (A, B, C, D, etc., annuli).

(2) subsea wells, | the tubing head, | the production casing annulus (A annulus).

(3) hybrid * wells, | the surface wellhead, | all annuli at the surface (A and B riser annuli). If the production casing below the mudline and the production casing riser above the mudline are pressure isolated from each other, provisions must be made to monitor the production casing below the mudline for casing pressure.

* Characterized as a well drilled with a subsea wellhead and completed with a surface casing head, a surface tubing head, a surface tubing hanger, and a surface christmas tree.

(c) You must design and test the wellhead, tree, and related equipment in accordance with API Specification 6A (incorporated by reference, see § 250.198) or API Specification 17D (incorporated by reference, see § 250.198), as applicable. The wellhead, tree, and related equipment must have a pressure rating greater than the maximum anticipated surface pressure and must be designed, installed, operated, maintained, and tested to achieve and maintain pressure containment and pressure control.

(1) Newly completed dry trees (e.g., fixed, hybrid, or mudline suspension) for production or injection wells must be equipped with a minimum of one master valve and one surface safety valve (SSV), installed above the master valve, in the vertical run of the tree.

(2) Newly completed subsea production or injection wells must be equipped with a minimum of one USV installed in the horizontal or vertical run of the tree (e.g., vertical or horizontal subsea trees).

(3) Newly completed wells with a mudline suspension conversion to a subsea tree must have a minimum of two casing strings tied back and sealed below the tubing head. At a minimum, the production casing and the next outer casing must be tied back to the wellhead, to ensure annular isolation.

(d) You must install, maintain, and test surface and subsurface safety equipment in accordance with the applicable requirements in subpart H of this part.

(e) When installed, packers and bridge plugs must meet the following:

(1) The uppermost permanently installed packer and all permanently installed bridge plugs qualified as mechanical barriers must comply with ANSI/API Specification 11D1 (incorporated by reference, see § 250.198);

(2) The production packer must be set at a depth that will allow for a column of weighted fluids to be placed above the packer that will exert a hydrostatic force greater than or equal to the force created by the reservoir pressure below the packer;

(3) The production packer must be set as close as practically possible to the perforated interval; and

(4) The production packer must be set at a depth that is within the cemented interval of the selected casing section.

(f) Your APM must include a description and calculations for how you determined the production packer setting depth.

(g) You must have two independent barriers, one being mechanical, in the exposed center wellbore prior to removing the tree and/or well control equipment.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012, as amended at 81 FR 26021, Apr. 29, 2016; 81 FR 61918, Sept. 7, 2016; 84 FR 21976, May 15, 2019; 89 FR 71120, Aug. 30, 2024; 91 FR 35351, June 10, 2026]

96 Casing Pressure Management
§ 250.519 What are the requirements for casing pressure management?

Once you install your wellhead, you must meet the casing pressure management requirements of API Recommended Practice 90 (incorporated by reference, see § 250.198) and the requirements of §§ 250.519 through 250.531. If there is a conflict between API Recommended Practice 90 and the casing pressure requirements of this subpart, you must follow the requirements of this subpart.

[84 FR 21976, May 15, 2019, as amended at 91 FR 35351, June 10, 2026]

§ 250.520 How often do I have to monitor for casing pressure?

You must monitor for casing pressure in your well according to the following table:

If you have . . . | you must monitor . . . | with a minimum one pressure data point recorded per . . .

(a) fixed platform wells, | monthly, | month for each casing.

(b) subsea wells, | continuously, | day for the production casing.

(c) hybrid wells, | continuously, | day for each riser and/or the production casing.

(d) wells operating under a casing pressure request on a manned fixed platform, | daily, | day for each casing.

(e) wells operating under a casing pressure request on an unmanned fixed platform, | weekly, | week for each casing.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.521 When do I have to perform a casing diagnostic test?

(a) You must perform a casing diagnostic test within 30 days after first observing or imposing casing pressure according to the following table:

If you have a . . . | you must perform a casing diagnostic test if . . .

(1) fixed platform well, | the casing pressure is greater than 100 psig.

(2) subsea well, | the measurable casing pressure is greater than the external hydrostatic pressure plus 100 psig measured at the subsea wellhead.

(3) hybrid well, | a riser or the production casing pressure is greater than 100 psig measured at the surface.

(b) You are exempt from performing a diagnostic pressure test for the production casing on a well operating under active gas lift.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.522 How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?

A newly completed or recompleted well often has thermal casing pressure during initial startup. Bleeding casing pressure during the startup process is considered a normal and necessary operation to manage thermal casing pressure; therefore, you do not need to evaluate these operations as a casing diagnostic test. After 30 days of continuous production, the initial production startup operation is complete and you must perform casing diagnostic testing as required in §§ 250.521 and 250.523.

[84 FR 21976, May 15, 2019]

§ 250.523 When do I have to repeat casing diagnostic testing?

Casing diagnostic testing must be repeated according to the following table:

When . . . | you must repeat diagnostic testing . . .

(a) your casing pressure request approved term has expired, | immediately.

(b) your well, previously on gas lift, has been shut-in or returned to flowing status without gas lift for more than 180 days, | immediately on the production casing (A annulus). The production casing (A annulus) of wells on active gas lift are exempt from diagnostic testing.

(c) your casing pressure request becomes invalid, | within 30 days.

(d) a casing or riser has an increase in pressure greater than 200 psig over the previous casing diagnostic test, | within 30 days.

(e) after any corrective action has been taken to remediate undesirable casing pressure, either as a result of a casing pressure request denial or any other action, | within 30 days.

(f) your fixed platform well production casing (A annulus) has pressure exceeding 10 percent of its minimum internal yield pressure (MIYP), except for production casings on active gas lift, | once per year, not to exceed 12 months between tests.

(g) your fixed platform well's outer casing (B, C, D, etc., annuli) has a pressure exceeding 20 percent of its MIYP, | once every 5 years, at a minimum.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.524 How long do I keep records of casing pressure and diagnostic tests?

Records of casing pressure and diagnostic tests must be kept at the field office nearest the well for a minimum of 2 years. The last casing diagnostic test for each casing or riser must be retained at the field office nearest the well until the well is abandoned.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.525 When am I required to take action from my casing diagnostic test?

You must take action if you have any of the following conditions:

(a) Any fixed platform well with a casing pressure exceeding its maximum allowable wellhead operating pressure (MAWOP);

(b) Any fixed platform well with a casing pressure that is greater than 100 psig and that cannot bleed to 0 psig through a 1/2-inch needle valve within 24 hours, or is not bled to 0 psig during a casing diagnostic test;

(c) Any well that has demonstrated tubing/casing, tubing/riser, casing/casing, riser/casing, or riser/riser communication;

(d) Any well that has sustained casing pressure (SCP) and is bled down to prevent it from exceeding its MAWOP, except during initial startup operations described in § 250.522;

(e) Any hybrid well with casing or riser pressure exceeding 100 psig; or

(f) Any subsea well with a casing pressure 100 psig greater than the external hydrostatic pressure at the subsea wellhead.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012; 84 FR 21976, May 15, 2019]

§ 250.526 What do I submit if my casing diagnostic test requires action?

Within 14 days after you perform a casing diagnostic test requiring action under § 250.525:

You must submit either . . . | to the appropriate . . . | and it must include . . . | You must also . . .

(a) a notification of corrective action; or, | District Manager and copy the Regional Supervisor, Field Operations, | requirements under § 250.527. | submit an Application for Permit to Modify or Corrective Action Plan within 30 days of the diagnostic test.

(b) a casing pressure request, | Regional Supervisor, Field Operations, | requirements under § 250.528.

[84 FR 21976, May 15, 2019]

§ 250.527 What must I include in my notification of corrective action?

The following information must be included in the notification of corrective action:

(a) Lessee or Operator name;

(b) Area name and OCS block number;

(c) Well name and API number; and

(d) Casing diagnostic test data.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.528 What must I include in my casing pressure request?

The following information must be included in the casing pressure request:

(a) API number;

(b) Lease number;

(c) Area name and OCS block number;

(d) Well number;

(e) Company name and mailing address;

(f) All casing, riser, and tubing sizes, weights, grades, and MIYP;

(g) All casing/riser calculated MAWOPs;

(h) All casing/riser pre-bleed down pressures;

(i) Shut-in tubing pressure;

(j) Flowing tubing pressure;

(k) Date and the calculated daily production rate during last well test (oil, gas, basic sediment, and water);

(l) Well status (shut-in, temporarily abandoned, producing, injecting, or gas lift);

(m) Well type (dry tree, hybrid, or subsea);

(n) Date of diagnostic test;

(o) Well schematic;

(p) Water depth;

(q) Volumes and types of fluid bled from each casing or riser evaluated;

(r) Type of diagnostic test performed:

(1) Bleed down/buildup test;

(2) Shut-in the well and monitor the pressure drop test;

(3) Constant production rate and decrease the annular pressure test;

(4) Constant production rate and increase the annular pressure test;

(5) Change the production rate and monitor the casing pressure test; and

(6) Casing pressure and tubing pressure history plot;

(s) The casing diagnostic test data for all casing exceeding 100 psig;

(t) Associated shoe strengths for casing shoes exposed to annular fluids;

(u) Concentration of any H2S that may be present;

(v) Whether the structure on which the well is located is manned or unmanned;

(w) Additional comments; and

(x) Request date.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.529 What are the terms of my casing pressure request?

Casing pressure requests are approved by the Regional Supervisor, Field Operations, for a term to be determined by the Regional Supervisor on a case-by-case basis. The Regional Supervisor may impose additional restrictions or requirements to allow continued operation of the well.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

§ 250.530 What if my casing pressure request is denied?

(a) If your casing pressure request is denied, then the operating company must submit plans for corrective action to the respective District Manager within 30 days of receiving the denial. The District Manager will establish a specific time period in which this corrective action will be taken. You must notify the respective District Manager within 30 days after completion of your corrected action.

(b) You must submit the casing diagnostic test data to the appropriate Regional Supervisor, Field Operations, within 14 days of completion of the diagnostic test required under § 250.523(e).

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012, as amended at 84 FR 21976, May 15, 2019]

§ 250.531 When does my casing pressure request approval become invalid?

A casing pressure request becomes invalid when:

(a) The casing or riser pressure increases by 200 psig over the approved casing pressure request pressure;

(b) The approved term ends;

(c) The well is worked-over, side-tracked, redrilled, recompleted, or acid stimulated;

(d) A different casing or riser on the same well requires a casing pressure request; or

(e) A well has more than one casing operating under a casing pressure request and one of the casing pressure requests become invalid, then all casing pressure requests for that well become invalid.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]

Subpart F Oil and Gas Well-Workover Operations
§ 250.600 General requirements.

Well-workover operations must be conducted in a manner to protect against harm or damage to life (including fish and other aquatic life), property, natural resources of the Outer Continental Shelf (OCS) including any mineral deposits (in areas leased and not leased), the National security or defense, or the marine, coastal, or human environment. In addition to the requirements of this subpart, you must also follow the applicable requirements of subpart G of this part.

[81 FR 26021, Apr. 29, 2016]

§ 250.601 Definitions.

When used in this subpart, the following terms shall have the meanings given below:

Expected surface pressure means the highest pressure predicted to be exerted upon the surface of a well. In calculating expected surface pressure, you must consider reservoir pressure as well as applied surface pressure.

Routine operations mean any of the following operations conducted on a well with the tree installed:

(a) Cutting paraffin;

(b) Removing and setting pump-through-type tubing plugs, gas-lift valves, and subsurface safety valves which can be removed by wireline operations;

(c) Bailing sand;

(d) Pressure surveys;

(e) Swabbing;

(f) Scale or corrosion treatment;

(g) Caliper and gauge surveys;

(h) Corrosion inhibitor treatment;

(i) Removing or replacing subsurface pumps;

(j) Through-tubing logging (diagnostics);

(k) Wireline fishing; and

(l) Setting and retrieving other subsurface flow-control devices.

(m) Acid treatments.

Workover operations mean the work conducted on wells after the initial completion for the purpose of maintaining or restoring the productivity of a well.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21976, May 15, 2019]

§ 250.602 [Reserved]
§ 250.603 Emergency shutdown system.

When well-workover operations are conducted on a well with the tree removed, an emergency shutdown system (ESD) manually controlled station shall be installed near the driller's console or well-servicing unit operator's work station, except when there is no other hydrocarbon-producing well or other hydrocarbon flow on the platform.

§ 250.604 Hydrogen sulfide.

When a well-workover operation is conducted in zones known to contain hydrogen sulfide (H2S) or in zones where the presence of H2S is unknown (as defined in § 250.490 of this part), the lessee shall take appropriate precautions to protect life and property on the platform or rig, including but not limited to operations such as blowing the well down, dismantling wellhead equipment and flow lines, circulating the well, swabbing, and pulling tubing, pumps and packers. The lessee shall comply with the requirements in § 250.490 of this part as well as the appropriate requirements of this subpart.

§ 250.605 Subsea workovers.

No subsea well-workover operation including routine operations shall be commenced until the lessee obtains written approval from the District Manager in accordance with § 250.613 of this part. That approval shall be based upon a case-by-case determination that the proposed equipment and procedures will maintain adequate control of the well and permit continued safe production operations.

§§ 250.606-250.608 [Reserved]
§ 250.609 Well-workover structures on fixed platforms.

Derricks, masts, substructures, and related equipment shall be selected, designed, installed, used, and maintained so as to be adequate for the potential loads and conditions of loading that may be encountered during the operations proposed. Prior to moving a well-workover rig or well-servicing equipment onto a platform, the lessee shall determine the structural capability of the platform to safely support the equipment and proposed operations, taking into consideration the corrosion protection, age of the platform, and previous stresses to the platform.

§ 250.610 Diesel engine air intakes.

You must equip diesel engine air intakes with a device to shut down the diesel engine in the event of runaway. Diesel engines that are continuously attended must be equipped with remotely operated, manual, or automatic shutdown devices. Diesel engines that are not continuously attended must be equipped with automatic shutdown devices.

[81 FR 36149, June 6, 2016]

§ 250.611 Traveling-block safety device.

You must equip all units being used for well-workover operations that have both a traveling block and a crown block with a safety device that is designed to prevent the traveling block from striking the crown block. You must check the device for proper operation weekly and after each drill-line slipping operation. You must enter the results of the operational check in the operations log.

[81 FR 36149, June 6, 2016]

§ 250.612 Field well-workover rules.

When geological and engineering information available in a field enables the District Manager to determine specific operating requirements, field well-workover rules may be established on the District Manager's initiative or in response to a request from a lessee. Such rules may modify the specific requirements of this subpart. After field well-workover rules have been established, well-workover operations in the field shall be conducted in accordance with such rules and other requirements of this subpart. Field well-workover rules may be amended or canceled for cause at any time upon the initiative of the District Manager or upon the request of a lessee.

§ 250.613 Approval and reporting for well-workover operations.

(a) No well-workover operation except routine ones, as defined in § 250.601 of this part, shall begin until the lessee receives written approval from the District Manager. Approval for these operations must be requested on Form BSEE-0124, Application for Permit to Modify.

(b) You must submit the following with Form BSEE-0124:

(1) A brief description of the well-workover procedures to be followed, a statement of the expected surface pressure, and type and weight of workover fluids;

(2) When changes in existing subsurface equipment are proposed, a schematic drawing of the well showing the zone proposed for workover and the workover equipment to be used;

(3) All information required in § 250.731.

(4) Where the well-workover is in a zone known to contain H2S or a zone where the presence of H2S is unknown, information pursuant to § 250.490 of this part; and

(5) Payment of the service fee listed in § 250.125.

(c) The following additional information shall be submitted with Form BSEE-0124 if completing to a new zone is proposed:

(1) Reason for abandonment of present producing zone including supportive well test data, and

(2) A statement of anticipated or known pressure data for the new zone.

(d) Within 30 days after completing the well-workover operation, except routine operations, Form BSEE-0124, Application for Permit to Modify, shall be submitted to the District Manager, showing the work as performed. In the case of a well-workover operation resulting in the initial recompletion of a well into a new zone, a Form BSEE-0125, End of Operations Report, shall be submitted to the District Manager and shall include a new schematic of the tubing subsurface equipment if any subsurface equipment has been changed.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50895, Aug. 22, 2012; 81 FR 26021, Apr. 29, 2016]

§ 250.614 Well-control fluids, equipment, and operations.

The following requirements apply during all well-workover operations with the tree removed:

(a) Well-control fluids, equipment, and operations shall be designed, utilized, maintained, and/or tested as necessary to control the well in foreseeable conditions and circumstances, including subfreezing conditions. The well shall be continuously monitored during well-workover operations and shall not be left unattended at anytime unless the well is shut in and secured.

(b) When coming out of the hole with drill pipe or a workover string, the annulus shall be filled with well-control fluid before the change in such fluid level decreases the hydrostatic pressure 75 pounds per square inch (psi) or every five stands of drill pipe or workover string, whichever gives a lower decrease in hydrostatic pressure. The number of stands of drill pipe or workover string and drill collars that may be pulled prior to filling the hole and the equivalent well-control fluid volume shall be calculated and posted near the operator's station. A mechanical, volumetric, or electronic device for measuring the amount of well-control fluid required to fill the hold shall be utilized.

(c) The following well-control-fluid equipment shall be installed, maintained, and utilized:

(1) A fill-up line above the uppermost BOP;

(2) A well-control, fluid-volume measuring device for determining fluid volumes when filling the hole on trips; and

(3) A recording mud-pit-level indicator to determine mud-pit-volume gains and losses. This indicator shall include both a visual and an audible warning device.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50895, Aug. 22, 2012; 81 FR 26021, Apr. 29, 2016]

§§ 250.615-250.618 [Reserved]
§ 250.619 Tubing and wellhead equipment.

The lessee shall comply with the following requirements during well-workover operations with the tree removed:

(a) No tubing string may be placed in service or continue to be used unless such tubing string has the necessary strength and pressure integrity and is otherwise suitable for its intended use.

(1) The tubing string must be evaluated for burst, collapse, and axial loads with appropriate safety factors and material design factors for the pressure and temperature environments of the completion, production, shut-in, and injection load cases.

(2) The tubing string materials must be appropriate for the environment. You must follow NACE Standard MR0175-2003 (incorporated by reference, see § 250.198) when H2S concentration may equal or exceed 0.05 psi partial pressure.

(3) The tubing string threaded connectors must be appropriate for the loading identified in paragraph (a)(1) of this section.

(b) When reinstalling the tree, you must:

(1) Equip wells to monitor for casing pressure according to the following chart:

If you have . . . | you must equip . . . | so you can monitor . . .

(i) fixed platform wells, | the wellhead, | all annuli (A, B, C, D, etc., annuli).

(ii) subsea wells, | the tubing head, | the production casing annulus (A annulus).

(iii) hybrid* wells, | the surface wellhead, | all annuli at the surface (A and B riser annuli). If the production casing below the mudline and the production casing riser above the mudline are pressure isolated from each other, provisions must be made to monitor the production casing below the mudline for casing pressure.

* Characterized as a well drilled with a subsea wellhead and completed with a surface casing head, a surface tubing head, a surface tubing hanger, and a surface christmas tree.

(2) Follow the casing pressure management requirements in subpart E of this part.

(c) You must design and test the wellhead, tree, and related equipment in accordance with API Specification 6A (incorporated by reference in § 250.198) or API Specification 17D (incorporated by reference, see § 250.198), as applicable. The wellhead, tree, and related equipment must have a pressure rating greater than the shut-in tubing pressure and must be designed, installed, operated, maintained, and tested so as to achieve and maintain pressure containment and pressure control.

(1) Dry trees (e.g., fixed, hybrid, or mudline suspension) for production or injection wells must be equipped with a minimum of one master valve and one surface safety valve (SSV), installed above the master valve, in the vertical run of the tree.

(2) Subsea production or injection wells must be equipped with a minimum of one USV installed in the horizontal or vertical run of the tree (for vertical or horizontal subsea trees).

(3) Wells with a mudline suspension conversion to a subsea tree must have a minimum of two casing strings tied back and sealed below the tubing head. At minimum, the production casing and the next outer casing must be tied back to the wellhead, to ensure annular isolation.

(d) You must install, maintain, and test surface and subsurface safety equipment in accordance with the applicable requirements in subpart H of this part.

(e) If you pull and reinstall packers and bridge plugs, you must meet the following requirements:

(1) The uppermost permanently installed packer and all permanently installed bridge plugs qualified as mechanical barriers must comply with ANSI/API Specification 11D1 (incorporated by reference, see § 250.198).

(2) The production packer must be set at a depth that will allow for a column of weighted fluids to be placed above the packer that will exert a hydrostatic force greater than or equal to the force created by the reservoir pressure below the packer;

(3) The production packer must be set as close as practically possible to the perforated interval; and

(4) The production packer must be set at a depth that is within the cemented interval of the selected casing section.

(f) Your APM must include a description and calculations for how you determined the production packer setting depth.

(g) You must have two independent barriers, one being mechanical, in the exposed center wellbore prior to removing the tree and/or well control equipment.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50895, Aug. 22, 2012, as amended at 81 FR 26021, Apr. 29, 2016; 81 FR 61918, Sept. 7, 2016; 84 FR 21976, May 15, 2019; 89 FR 71121, Aug. 30, 2024; 91 FR 35351, June 10, 2026]

§ 250.620 Wireline operations.

The lessee shall comply with the following requirements during routine, as defined in § 250.601 of this part, and nonroutine wireline workover operations:

(a) Wireline operations shall be conducted so as to minimize leakage of well fluids. Any leakage that does occur shall be contained to prevent pollution.

(b) All wireline perforating operations and all other wireline operations where communication exists between the completed hydrocarbon-bearing zone(s) and the wellbore shall use a lubricator assembly containing at least one wireline valve.

(c) When the lubricator is initially installed on the well, it shall be successfully pressure tested to the expected shut-in surface pressure.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50895, Aug. 22, 2012]

Subpart G Well Operations and Equipment

Source: 81 FR 26022, Apr. 29, 2016, unless otherwise noted.

97 General Requirements
§ 250.700 What operations and equipment does this subpart cover?

This subpart covers operations and equipment associated with drilling, completion, workover, and decommissioning activities. This subpart includes regulations applicable to drilling, completion, workover, and decommissioning activities in addition to applicable regulations contained in subparts D, E, F, and Q of this part unless explicitly stated otherwise.

§ 250.701 May I use alternate procedures or equipment during operations?

You may use alternate procedures or equipment during operations after receiving approval as described in § 250.141. You must identify and discuss your proposed alternate procedures or equipment in your Application for Permit to Drill (APD) (Form BSEE-0123) (see § 250.414(h)) or your Application for Permit to Modify (APM) (Form BSEE-0124). Procedures for obtaining approval of alternate procedures or equipment are described in § 250.141.

§ 250.702 May I obtain departures from these requirements?

You may apply for a departure from these requirements as described in § 250.142. Your request must include a justification showing why the departure is necessary. You must identify and discuss the departure you are requesting in your APD (see § 250.414(h)) or your APM.

§ 250.703 What must I do to keep wells under control?

You must take the necessary precautions to keep wells under control at all times, including:

(a) Use recognized engineering practices to reduce risks to the lowest level practicable when monitoring and evaluating well conditions and to minimize the potential for the well to flow or kick;

(b) Have a person onsite during operations who represents your interests and can fulfill your responsibilities;

(c) Ensure that the toolpusher, operator's representative, or a member of the rig crew maintains continuous surveillance on the rig floor from the beginning of operations until the well is completed or abandoned, unless you have secured the well with blowout preventers (BOPs), bridge plugs, cement plugs, or packers;

(d) Use personnel trained according to the provisions of subparts O and S of this part;

(e) Use and maintain equipment and materials necessary to ensure the safety and protection of personnel, equipment, natural resources, and the environment; and

(f) Use equipment that has been designed, tested, and rated for the maximum environmental and operational conditions to which it may be exposed while in service.

98 Rig Requirements
§ 250.710 What instructions must be given to personnel engaged in well operations?

Prior to engaging in well operations, personnel must be instructed in:

(a) Hazards and safety requirements. You must instruct your personnel regarding the safety requirements for the operations to be performed, possible hazards to be encountered, and general safety considerations to protect personnel, equipment, and the environment as required by subpart S of this part. The date and time of safety meetings must be recorded and available at the facility for review by BSEE representatives.

(b) Well control. You must prepare a well-control plan for each well. Each well-control plan must contain instructions for personnel about the use of each well-control component of your BOP, procedures that describe how personnel will seal the wellbore and shear pipe before maximum anticipated surface pressure (MASP) conditions are exceeded, assignments for each crew member, and a schedule for completion of each assignment. You must keep a copy of your well-control plan on the rig at all times, and make it available to BSEE upon request. You must post a copy of the well-control plan on the rig floor.

§ 250.711 What are the requirements for well-control drills?

You must conduct a weekly well-control drill with all personnel engaged in well operations. Your drill must familiarize personnel engaged in well operations with their roles and functions so that they can perform their duties promptly and efficiently as outlined in the well-control plan required by § 250.710.

(a) Timing of drills. You must conduct each drill during a period of activity that minimizes the risk to operations. The timing of your drills must cover a range of different operations, including drilling with a diverter, on-bottom drilling, and tripping. The same drill may not be repeated consecutively with the same crew.

(b) Recordkeeping requirements. For each drill, you must record the following in the daily report:

(1) Date, time, and type of drill conducted;

(2) The amount of time it took to be ready to close the diverter or use each well-control component of BOP system; and

(3) The total time to complete the entire drill.

(c) A BSEE ordered drill. A BSEE representative may require you to conduct a well-control drill during a BSEE inspection. The BSEE representative will consult with your onsite representative before requiring the drill.

§ 250.712 What rig unit movements must I report?

(a) You must report the movement of all rig units on and off locations to the District Manager using Form BSEE-0144, Rig Movement Notification Report. Rig units include MODUs, platform rigs, snubbing units, wire-line units used for non-routine operations, and coiled tubing units. You must inform the District Manager 24 hours before:

(1) The arrival of a rig unit on location;

(2) The movement of a rig unit to another slot. For movements that will occur less than 24 hours after initially moving onto location (e.g., coiled tubing and batch operations), you may include your anticipated movement schedule on Form BSEE-0144; or

(3) The departure of a rig unit from the location.

(b) You must provide the District Manager with the rig name, lease number, well number, and expected time of arrival or departure.

(c) If a MODU or platform rig is to be warm or cold stacked, you must inform the District Manager:

(1) Where the MODU or platform rig is coming from;

(2) The location where the MODU or platform rig will be positioned;

(3) Whether the MODU or platform rig will be manned or unmanned; and

(4) If the location for stacking the MODU or platform rig changes.

(d) Prior to resuming operations after stacking, you must notify the appropriate District Manager of any construction, repairs, or modifications associated with the drilling package made to the MODU or platform rig.

(e) If a drilling rig is entering OCS waters, you must inform the District Manager where the drilling rig is coming from.

(f) If you change your anticipated date for initially moving on or off location by more than 24 hours, you must submit an updated Form BSEE-0144, Rig Movement Notification Report.

(g) You are not required to report rig unit movements to and from the safe zone during the course of permitted operations.

(h) If a rig unit is already on a well, you are not required to report any additional rig unit movements on that well.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21976, May 15, 2019]

§ 250.713 What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations?

If you plan to use a MODU for well operations, you must provide:

(a) Fitness requirements. Information and data to demonstrate the MODU's capability to perform at the proposed location. This information must include the maximum environmental and operational conditions that the MODU is designed to withstand, including the minimum air gap necessary for both hurricane and non-hurricane seasons. If sufficient environmental information and data are not available at the time you submit your APD or APM, the District Manager may approve your APD or APM, but require you to collect and report this information during operations. Under this circumstance, the District Manager may revoke the approval of the APD or APM if information collected during operations shows that the MODU is not capable of performing at the proposed location.

(b) Foundation requirements. Information to show that site-specific soil and oceanographic conditions are capable of supporting the proposed bottom-founded MODU. If you provided sufficient site-specific information in your EP, DPP, or DOCD submitted to BOEM for that well location and conditions, you may reference that information. The District Manager may require you to conduct additional surveys and soil borings before approving the APD or APM if additional information is needed to make a determination that the conditions are capable of supporting the MODU, or equipment installed on a subsea wellhead. For a moored rig, you must submit a plat of the rig's anchor pattern approved in your EP, DPP, or DOCD in your APD or APM.

(c) For frontier areas. (1) If the design of the MODU you plan to use in a frontier area is unique or has not been proven for use in the proposed environment, the District Manager may require you to submit a third-party review of the MODU design. If required, you must obtain a third-party review of your MODU similar to the process outlined in §§ 250.915 through 250.918. You may submit this information before submitting an APD or APM.

(2) If you plan to conduct operations in a frontier area, you must have a contingency plan that addresses design and operating limitations of the MODU. Your plan must identify the actions necessary to maintain safety and prevent damage to the environment. Actions must include the suspension, curtailment, or modification of operations to remedy various operational or environmental situations (e.g., vessel motion, riser offset, anchor tensions, wind speed, wave height, currents, icing or ice-loading, settling, tilt or lateral movement, resupply capability).

(d) Additional documentation. You must provide the current Certificate of Inspection (for U.S.-flag vessels) or Certificate of Compliance (for foreign-flag vessels) from the USCG and Certificate of Classification. You must also provide current documentation of any operational limitations imposed by an appropriate classification society.

(e) Dynamically positioned MODU. If you use a dynamically positioned MODU, you must include in your APD or APM your contingency plan for moving off location in an emergency situation. At a minimum, your plan must address emergency events caused by storms, currents, station-keeping failures, power failures, and losses of well control. The District Manager may require your plan to include additional events that may require movement of the MODU and other information needed to clarify or further address how the MODU will respond to emergencies or other events.

(f) Inspection of MODU. The MODU must be available for inspection by the District Manager before commencing operations and at any time during operations.

(g) Current monitoring. For water depths greater than 400 meters (1,312 feet), you must include in your APD or APM:

(1) A description of the specific current speeds that will cause you to implement rig shutdown, move-off procedures, or both; and

(2) A discussion of the specific measures you will take to curtail rig operations and move off location when such currents are encountered. You may use criteria, such as current velocities, riser angles, watch circles, and remaining rig power to describe when these procedures or measures will be implemented.

[81 FR 26022, Apr. 29, 2016, as amended at 81 FR 36150, June 6, 2016]

§ 250.714 Do I have to develop a dropped objects plan?

If you use a floating rig unit in an area with subsea infrastructure, you must develop a dropped objects plan and make it available to BSEE upon request. This plan must be updated as the infrastructure on the seafloor changes. Your plan must include:

(a) A description and plot of the path the rig will take while running and pulling the riser;

(b) A plat showing the location of any subsea wells, production equipment, pipelines, and any other identified debris;

(c) Modeling of a dropped object's path with consideration given to metocean conditions for various material forms, such as a tubular (e.g., riser or casing) and box (e.g., BOP or tree);

(d) Communications, procedures, and delegated authorities established with the production host facility to shut-in any active subsea wells, equipment, or pipelines in the event of a dropped object; and

(e) Any additional information required by the District Manager as appropriate to clarify, update, or evaluate your dropped objects plan.

§ 250.715 Do I need a global positioning system (GPS) for all MODUs?

All MODUs must have a minimum of two functioning GPS transponders at all times, and you must provide to BSEE real-time access to the GPS data prior to and during each hurricane season.

(a) The GPS must be capable of monitoring the position and tracking the path in real-time if the MODU moves from its location during a severe storm.

(b) You must install and protect the tracking system's equipment to minimize the risk of the system being disabled.

(c) You must place the GPS transponders in different locations for redundancy to minimize risk of system failure.

(d) Each GPS transponder must be capable of transmitting data for at least 7 days after a storm has passed.

(e) If the MODU is moved off location in the event of a storm, you must immediately begin to record the GPS location data.

(f) You must contact the Regional Office and allow real-time access to the MODU location data. When you contact the Regional Office, provide the following:

(1) Name of the lessee and operator with contact information;

(2) MODU name;

(3) Initial date and time; and

(4) How you will provide GPS real-time access.

99 Well Operations
§ 250.720 When and how must I secure a well?

(a) Whenever you interrupt operations, you must notify the District Manager. Before moving off the well, you must have two independent barriers installed, at least one of which must be a mechanical barrier, as approved by the District Manager. You must install the barriers at appropriate depths within a properly cemented casing string or liner. Before removing a subsea BOP stack or surface BOP stack on a mudline suspension well, you must conduct a negative pressure test in accordance with § 250.721.

(1) The events that would cause you to interrupt operations and notify the District Manager include, but are not limited to, the following:

(i) Evacuation of the rig crew;

(ii) Inability to keep the rig on location;

(iii) Repair to major rig or well-control equipment;

(iv) Observed flow outside the well's casing (e.g., shallow water flow or bubbling); or

(v) Impending National Weather Service-named tropical storm or hurricane.

(2) The District Manager may approve alternate procedures or barriers, in accordance with § 250.141, if you do not have time to install the required barriers or if special circumstances occur.

(3) If you unlatch the BOP or LMRP:

(i) Upon relatch of the BOP, you must test according to § 250.734(b)(2), or

(ii) Upon relatch of the LMRP, you must test according to § 250.734(b)(3); and

(iii) You must submit a revised permit with a written statement from an independent third party certifying that the previous certification under § 250.731(c) remains valid and receive District Manager approval before resuming operations.

(b) Before you displace kill-weight fluid from the wellbore and/or riser, thereby creating an underbalanced state, you must obtain approval from the District Manager. To obtain approval, you must submit with your APD or APM your reasons for displacing the kill-weight fluid and provide detailed step-by-step written procedures describing how you will safely displace these fluids. The step-by-step displacement procedures must address the following:

(1) Number and type of independent barriers, as described in § 250.420(b)(3), that are in place for each flow path that requires such barriers;

(2) Tests you will conduct to ensure integrity of independent barriers;

(3) BOP procedures you will use while displacing kill-weight fluids; and

(4) Procedures you will use to monitor the volumes and rates of fluids entering and leaving the wellbore.

(c) For Arctic OCS exploratory drilling operations, in addition to the requirements of paragraphs (a) and (b) of this section:

(1) If you move your drilling rig off a well prior to completion or permanent abandonment, you must ensure that any equipment left on, near, or in a wellbore that has penetrated below the surface casing is positioned in a manner to:

(i) Protect the well head; and

(ii) Prevent or minimize the likelihood of compromising the down-hole integrity of the well or the effectiveness of the well plugs.

(2) In areas of ice scour you must use a well mudline cellar or an equivalent means of minimizing the risk of damage to the well head and wellbore. BSEE may approve an equivalent means that will meet or exceed the level of safety and environmental protection provided by a mudline cellar if the operator can show that utilizing a mudline cellar would compromise the stability of the rig, impede access to the well head during a well control event, or otherwise create operational risks.

(d) You must have the equipment used solely for intervention operations (e.g., tree interface tools) identified, readily available, properly maintained, and available for BSEE inspection upon request. This equipment is required for subsea completed wells with a tree installed, that meet the following conditions:

(1) Have a shut-in tubing pressure that is greater than the hydrostatic pressure of the water column, or

(2) Are not capable of having the annulus monitored.

[81 FR 26022, Apr. 29, 2016, as amended at 81 FR 46563, July 15, 2016; 84 FR 21976, May 15, 2019]

§ 250.721 What are the requirements for pressure testing casing and liners?

(a) You must test each casing string that extends to the wellhead according to the following table:

Casing type | Minimum test pressure

(1) Drive or Structural, | Not required.

(2) Conductor, excluding subsea wellheads, | 250 psi.

(3) Surface, Intermediate, and Production, | 70 percent of its minimum internal yield.

(b) You must test each drilling liner and liner-top to a pressure at least equal to the anticipated leak-off pressure of the formation below that liner shoe, or subsequent liner shoes if set. You must conduct this test before you continue operations in the well.

(c) You must test each production liner and liner-top to a minimum of 500 psi above the formation fracture pressure at the casing shoe into which the liner is lapped.

(d) The District Manager may approve or require other casing test pressures as appropriate under the circumstances to ensure casing integrity.

(e) If you plan to produce a well, you must:

(1) For a well that is fully cased and cemented, pressure test the entire well to maximum anticipated shut-in tubing pressure, not to exceed 70% of the burst rating limit of the weakest component before perforating the casing or liner; or

(2) For an open-hole completion, pressure test the entire well to maximum anticipated shut-in tubing pressure, not to exceed 70% of the burst rating limit of the weakest component before you drill the open-hole section.

(f) You may not resume operations until you obtain a satisfactory pressure test. If the pressure declines more than 10 percent in a 30-minute test, or if there is another indication of a leak, you must submit to the District Manager for approval your proposed plans to re-cement, repair the casing or liner, or run additional casing/liner to provide a proper seal. Your submittal must include a PE certification of your proposed plans.

(g) You must perform a negative pressure test on all wells that use a subsea BOP stack or wells with mudline suspension systems.

(1) You must perform a negative pressure test on your final casing string or liner. This test must be conducted after setting your second barrier just above the shoe track, but prior to conducting any completion operations.

(2) You must perform a negative pressure test prior to unlatching the BOP at any point in the well. The negative pressure test must be performed on those components, at a minimum, that will be exposed to the negative differential pressure that will occur when the BOP is disconnected.

(3) The District Manager may require you to perform additional negative pressure tests on other casing strings or liners (e.g., intermediate casing string or liner) or on wells with a surface BOP stack as appropriate to demonstrate casing or liner integrity.

(4) You must submit for approval with your APD or APM, test procedures and criteria for a successful negative pressure test. If any of your test procedures or criteria for a successful test change, you must submit for approval the changes in a revised APD or APM.

(5) You must document all your test results and make them available to BSEE upon request.

(6) If you have any indication of a failed negative pressure test, such as, but not limited to, pressure buildup or observed flow, you must immediately investigate the cause. If your investigation confirms that a failure occurred during the negative pressure test, you must:

(i) Correct the problem and immediately notify the appropriate District Manager; and

(ii) Submit a description of the corrective action taken and receive approval from the appropriate District Manager for the retest.

(7) You must have two barriers in place, as described in § 250.420(b)(3), at any time and for any well, prior to performing the negative pressure test.

(8) You must include documentation of the successful negative pressure test in the End-of-Operations Report (Form BSEE-0125).

§ 250.722 What are the requirements for prolonged operations in a well?

If wellbore operations continue within a casing or liner for more than 30 days from the previous pressure test of the well's casing or liner, you must:

(a) Stop operations as soon as practicable, and evaluate the effects of the prolonged operations on continued operations and the life of the well. At a minimum, you must:

(1) Evaluate the well casing with a pressure test, caliper tool, or imaging tool. On a case-by-case basis, the District Manager may require a specific method of evaluation of the effects on the well casing of prolonged operations; and

(2) Report the results of your evaluation to the District Manager and obtain approval of those results before resuming operations. Your report must include calculations that indicate the well's integrity is above the minimum safety factors, if an imaging tool or caliper is used. District Manager approval is not required to resume operations if you conducted a successful pressure test as approved in your permit. You must document the successful pressure test in the WAR.

(b) If well integrity has deteriorated to a level below minimum safety factors, you must:

(1) Obtain approval from the District Manager to begin repairs or install additional casing. To obtain approval, you must also provide a PE certification showing that he or she reviewed and approved the proposed changes;

(2) Repair the casing or run another casing string; and

(3) Perform a pressure test after the repairs are made or additional casing is installed and report the results to the District Manager as specified in § 250.721.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21977, May 15, 2019]

§ 250.723 What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow?

You must take the following safety measures when you conduct operations with a rig unit on or jacked-up over a platform with producing wells or that has other hydrocarbon flow:

(a) The movement of rig units and related equipment on and off a platform or from well to well on the same platform, including rigging up and rigging down, must be conducted in a safe manner;

(b) You must install an emergency shutdown station for the production system near the rig operator's console;

(c) You must shut-in all producible wells located in the affected wellbay below the surface and at the wellhead when:

(1) You move a rig unit or related equipment on and off a platform. This includes rigging up and rigging down activities within 500 feet of the affected platform;

(2) You move or skid a rig unit between wells on a platform; or

(3) A MODU moves within 500 feet of a platform. You may resume production once the MODU is in place, secured, and ready to begin operations.

(d) All wells in the same well-bay which are capable of producing hydrocarbons must be shut-in below the surface with a pump-through-type tubing plug and at the surface with a closed master valve prior to moving rig units and related equipment, unless otherwise approved by the District Manager.

(1) A closed surface-controlled subsurface safety valve of the pump-through-type may be used in lieu of the pump-through-type tubing plug provided that the surface control has been locked out of operation.

(2) The well to which a rig unit or related equipment is to be moved must be equipped with a back-pressure valve prior to removing the tree and installing and testing the BOP system.

(3) The well from which a rig unit or related equipment is to be moved must be equipped with a back pressure valve prior to removing the BOP system and installing the production tree.

(e) Coiled tubing units, snubbing units, or wireline units may be moved onto and off of a platform without shutting in wells.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21977, May 15, 2019]

§ 250.724 What are the real-time monitoring requirements?

(a) When conducting well operations with a subsea BOP or with a surface BOP on a floating facility, or when operating in an high pressure high temperature (HPHT) environment, you must gather and monitor real-time well data using an independent, automatic, and continuous monitoring system capable of recording, storing, and transmitting data regarding the following:

(1) The BOP control system;

(2) The well's active fluid circulating system; and

(3) The well's downhole conditions with the bottom hole assembly tools (if any tools are installed).

(b) You must transmit these data as they are gathered, barring unforeseeable or unpreventable interruptions in transmission, and have the capability to monitor the data, using qualified personnel in accordance with a real-time monitoring plan, as provided in paragraph (c) of this section.

(c) You must develop and implement a real-time monitoring plan. Your real-time monitoring plan, and all real-time monitoring data, must be made available to BSEE upon request. Your real-time monitoring plan must include the following:

(1) A description of your real-time monitoring capabilities, including the types of the data collected;

(2) A description of how your real-time monitoring data will be transmitted during operations, how the data will be labeled and monitored by qualified personnel, and how the data will be stored as required in §§ 250.740 and 250.741;

(3) A description of your procedures for providing BSEE access, upon request, to your real-time monitoring data;

(4) The qualifications of the personnel monitoring the data;

(5) Your procedures for, and methods of, communication between rig personnel and the monitoring personnel; and

(6) Actions to be taken if you lose any real-time monitoring capabilities or communications between rig personnel and monitoring personnel, and a protocol for how you will respond to any significant and/or prolonged interruption of monitoring capabilities or communications, including your protocol for notifying BSEE of any significant and/or prolonged interruptions.

[84 FR 21977, May 15, 2019]

100 Blowout Preventer (BOP) System Requirements
§ 250.730 What are the general requirements for BOP systems and system components?

(a) You must ensure that the BOP system and system components are designed, installed, maintained, inspected, tested, and used properly to ensure well control. The working-pressure rating of each BOP component (excluding annular(s)) must exceed MASP as defined for the operation. For a subsea BOP, the MASP must be determined at the mudline. The BOP system includes the BOP stack, control system, and any other associated system(s) and equipment. The BOP system and individual components must be able to perform their expected functions and be compatible with each other. Your BOP system must be capable of closing and sealing the wellbore to the well's MASP at all times, except as otherwise specified in the BOP system requirements of this subpart. The BOP system must be capable of closing and sealing without losing ram closure time and sealing integrity due to the corrosiveness, volume, and abrasiveness of any fluids in the wellbore that the BOP system may encounter. Your BOP system must meet the following requirements:

(1) The BOP requirements of API Standard 53 (incorporated by reference, see § 250.198) and the requirements of §§ 250.733 through 250.739. If there is a conflict between API Standard 53 and the requirements of this subpart, you must follow the requirements of this subpart.

(2) The provisions of the following industry standards (all incorporated by reference, see § 250.198) that apply to BOP systems:

(i) API Specification 6A;

(ii) ANSI/API Specification 16A;

(iii) ANSI/API Specification 16C;

(iv) API Specification 16D;

(v) API Specification 17D;

(vi) API Specification 20E; and

(vii) API Specification 20F.

(3) For surface and subsea BOPs, the pipe and variable bore rams installed in the BOP stack must be capable of effectively closing and sealing on the tubular body of any drill pipe, workstring, and tubing (excluding tubing with exterior control lines and flat packs) in the hole under MASP, as defined for the operation, at the proposed regulator settings of the BOP control system.

(4) The current set of approved schematic drawings must be available on the rig and at an onshore location. If you make any modifications to the BOP or control system that will require changes to your BSEE-approved schematic drawings, you must suspend operations until you obtain approval from the District Manager.

(b) You must ensure that the design, fabrication, maintenance, and repair of your BOP system is in accordance with the requirements contained in this part, applicable Original Equipment Manufacturer's (OEM) recommendations unless otherwise directed by BSEE, and recognized engineering practices. The training and qualification of repair and maintenance personnel must meet or exceed applicable OEM training recommendations unless otherwise directed by BSEE.

(c) You must follow the failure reporting procedures contained in API Standard 53 (incorporated by reference, see § 250.198) and:

(1) You must provide a written notice of equipment failure to the Office of Offshore Regulatory Programs (OORP) Chief, any third party designated by BSEE pursuant to paragraph (c)(4) of this section, and the manufacturer of such equipment within 30 days after the discovery and identification of the failure. A failure is any condition that prevents the equipment from meeting the functional specification.

(2) You must start an investigation and a failure analysis within 90 days of the failure to determine the cause of the failure and complete the investigation and the failure analysis within 120 days after initiation. You also must document the results and any corrective action. You must submit the analysis report to the OORP Chief, any third party designated by BSEE pursuant to paragraph (c)(4) of this section, and the manufacturer. If you cannot complete the investigation and analysis within the specified time, you must submit an extension request detailing when and how you will complete the investigation and analysis to BSEE for approval. You must submit the extension request to the OORP Chief.

(3) If the equipment manufacturer notifies you that it has changed the design of the equipment that failed or if you have changed operating or repair procedures as a result of a failure, then you must, within 30 days of such changes, report the design change or modified procedures in writing to the OORP Chief, and any third party designated by BSEE pursuant to paragraph (c)(4) of this section.

(4) Submit notices and reports to the Chief, Office of Offshore Regulatory Programs; Bureau of Safety and Environmental Enforcement; 45600 Woodland Road, Sterling, Virginia 20166. BSEE may designate a third party to also receive the data and reports. If BSEE designates a third party, you must submit the data and reports to the designated third party as well.

(d) If you plan to use a BOP stack manufactured after the effective date of this regulation, you must use one manufactured pursuant to an ANSI/API Specification Q1 (incorporated by reference, see § 250.198) quality management system. Such quality management system must be certified by an entity that meets the requirements of ISO/IEC 17021-1 (incorporated by reference, see § 250.198).

(1) BSEE may consider accepting equipment manufactured under quality assurance programs other than ANSI/API Spec. Q1, provided you submit a request to the Chief, OORP for approval, containing relevant information about the alternative program.

(2) You must submit this request to the Chief, OORP; Bureau of Safety and Environmental Enforcement; 45600 Woodland Road, Sterling, Virginia 20166.

[84 FR 21977, May 15, 2019, as amended at 88 FR 58347, Aug. 23, 2023; 91 FR 35352, June 10, 2026]

§ 250.731 What information must I submit for BOP systems and system components?

For any operation that requires the use of a BOP, you must include the information listed in this section with your applicable APD, APM, or other submittal. You are required to submit this information only once for each well, unless the information changes from what you provided in an earlier approved submission or you have moved off location from the well. After you have submitted this information for a particular well, subsequent APMs or other submittals for the well should reference the approved submittal containing the information required by this section and confirm that the information remains accurate and that you have not moved off location from that well. If the information changes or you have moved off location from the well, you must submit updated information in your next submission.

You must submit: | Including:

(a) A complete description of the BOP system and system components, | (1) Pressure ratings of BOP equipment;

(2) Proposed BOP test pressures (for subsea BOPs, include both surface and corresponding subsea pressures);

(3) Rated capacities for liquid and gas for the fluid-gas separator system;

(4) Control fluid volumes needed to close, seal, and open each component;

(5) Control system pressure and regulator settings needed to close each ram BOP under MASP as defined for the operation;

(6) Number and volume of accumulator bottles and bottle banks (for subsea BOP, include both surface and subsea bottles);

(7) Accumulator pre-charge calculations (for subsea BOP, include both surface and subsea calculations);

(8) All locking devices; and

(9) Control fluid volume calculations for the accumulator system (for a subsea BOP system, include both the surface and subsea volumes).

(b) Schematic drawings, | (1) The inside diameter of the BOP stack;

(2) Number and type of preventers (including blade type for shear ram(s));

(3) All locking devices;

(4) Size range for variable bore ram(s);

(5) Size of fixed ram(s);

(6) All control systems with all alarms and set points labeled, including pods;

(7) Location and size of choke and kill lines (and gas bleed line(s) for subsea BOP);

(8) Associated valves of the BOP system;

(9) Control station locations; and

(10) A cross-section of the riser for a subsea BOP system showing number, size, and labeling of all control, supply, choke, and kill lines down to the BOP.

(c) Certification by an independent third party, | Verification that: (1) Test data demonstrate the shear ram(s) will shear the drill pipe at the water depth as required in § 250.732; (2) The BOP was designed, tested, and maintained to perform under the maximum environmental and operational conditions anticipated to occur at the well; (3) The accumulator system has sufficient fluid to operate the BOP system without assistance from the charging system; and (4) If using a subsea BOP, a BOP in an HPHT environment as defined in § 250.105, or a surface BOP on a floating facility, the BOP has not been compromised or damaged from previous service.

(d) If you are using a subsea BOP, descriptions of autoshear, deadman, and emergency disconnect sequence (EDS) systems, | A listing of the functions with their sequences and timing.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21978, May 15, 2019; 89 FR 71121, Aug. 30, 2024]

§ 250.732 What are the independent third party requirements for BOP systems and system components?

(a) Prior to beginning any operation requiring the use of any BOP, you must submit verification by an independent third party and supporting documentation as required by this paragraph to the appropriate District Manager and Regional Supervisor.

You must submit verification and documentation related to: | That:

(1) Shear testing, | (i) Demonstrates that the BOP will shear the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines and any electric-, wire-, and slick-line to be used in the well;

(ii) Demonstrates the use of test protocols and analysis that represent recognized engineering practices for ensuring the repeatability and reproducibility of the tests, and that the testing was performed by a facility that meets generally accepted quality assurance standards;

(iii) Provides a reasonable representation of field applications, taking into consideration the physical and mechanical properties of the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines and any electric-, wire-, and slick-line to be used in the well;

(iv) Ensures testing was performed on the outermost edges of the shearing blades of the shear ram;

(v) Demonstrates the shearing capacity of the BOP equipment to the physical and mechanical properties of the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines and any electric-, wire-, and slick-line to be used in the well; and

(vi) Includes relevant testing results.

(2) Pressure integrity testing for sealing components, and | (i) Shows that testing is conducted after the shearing is completed and prior to opening the component;

(ii) Demonstrates that the equipment will seal at the rated working pressures (RWP) of the BOP for 5 minutes; and

(iii) Includes all relevant test results.

(3) Calculations, | Include shearing and sealing pressures for all pipe to be used in the well including corrections for MASP.

(b) The independent third party must be a technical classification society, a licensed professional engineering firm, or a registered professional engineer capable of providing the required certifications and verifications. You must submit the independent third party qualifications to BSEE with the associated permit application (e.g., APD and APM). BSEE will evaluate the submitted qualifications to ensure they meet the regulatory requirements for permit approval.

(c) Before you begin any operations in an HPHT environment, as defined by § 250.105, with the proposed equipment, you must include the following in your applicable permit:

(1) The I3P certification required in § 250.731(c);

(2) A description of any new or unusual technology being used;

(3) A reference to the previously approved associated New or Unusual Technology Barrier Equipment Conceptual Plan;

(4) The final report and statements in accordance with § 250.232(c); and

(5) The fit for service statement required in § 250.230.

You may not deploy your proposed BOP systems and related equipment that will or may be exposed to an HPHT environment until BSEE approves the New or Unusual Technology Barrier Equipment Conceptual Plan and appropriate permits (e.g., APD and APM).

(d) You must make all documentation that demonstrates compliance with the requirements of this section available to BSEE upon request.

[84 FR 21978, May 15, 2019, as amended at 88 FR 57347, Aug. 23, 2023; 89 FR 71121, Aug. 30, 2024]

§ 250.733 What are the requirements for a surface BOP stack?

(a) When you drill or conduct operations with a surface BOP stack, you must install the BOP system before drilling or conducting operations to deepen the well below the surface casing and after the well is deepened below the surface casing point. The surface BOP stack must include at least four remote-controlled, hydraulically operated BOPs, consisting of one annular BOP, one BOP equipped with blind shear rams, and two BOPs equipped with pipe rams.

(1) The blind shear rams must be capable of shearing at any point along the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies that include heavy-weight pipe or collars), workstring, tubing and associated exterior control lines, and any electric-, wire-, and slick-line that is in the hole and sealing the wellbore after shearing. Prior to April 29, 2021, if your blind shear rams are unable to cut any electric-, wire-, or slick-line under MASP as defined for the operation and seal the wellbore, you must use an alternative cutting device capable of shearing the lines before closing the BOP. This device must be available on the rig floor during operations that require their use.

(2) The two BOPs equipped with pipe rams must be capable of closing and sealing on the tubular body of any drill pipe, workstring, and tubing under MASP, as defined for the operation, except for tubing with exterior control lines and flat packs, a bottom hole assembly that includes heavy-weight pipe or collars, and bottom-hole tools.

(b) If you plan to use a surface BOP on a floating production facility you must:

(1) On new floating production facilities installed after April 29, 2021, that include a surface BOP, or when you replace an entire surface BOP stack on an existing floating production facility, follow the BOP requirements in § 250.734(a)(1).

(2) For risers installed after July 28, 2016, use a dual bore riser configuration before drilling or operating in any hole section or interval where hydrocarbons are, or may be, exposed to the well. The dual bore riser must meet the design requirements of API Recommended Practice 2RD (incorporated by reference, see § 250.198), including appropriate design for the maximum anticipated operating and environmental conditions.

(i) For a dual bore riser configuration, the annulus between the risers must be monitored for pressure during operations. You must describe in your APD or APM your annulus monitoring plan and how you will secure the well in the event a leak is detected.

(ii) The inner riser for a dual riser configuration is subject to the requirements at § 250.721 for testing the casing or liner.

(c) You must install separate side outlets on the BOP stack for the kill and choke lines. If your stack does not have side outlets, you must install a drilling spool with side outlets. The outlet valves must hold pressure from both directions.

(d) You must install a choke and a kill line on the BOP stack. You must equip each line with two full-bore, full-opening valves, one of which must be remote-controlled. On the kill line, you may install a check valve and a manual valve instead of the remote-controlled valve. To use this configuration, both manual valves must be readily accessible and you must install the check valve between the manual valves and the pump.

(e) Additional requirements for surface BOP systems used in well-completion, workover, and decommissioning operations. The minimum BOP system for well-completion, workover, and decommissioning operations must meet the appropriate standards from the following table:

When . . . | The minimum BOP stack must include . . .

(1) The expected pressure is less than 5,000 psi, | Three BOPs consisting of an annular, one set of pipe rams, and one set of blind-shear rams.

(2) The expected pressure is 5,000 psi or greater or you use multiple tubing strings, | Four BOPs consisting of an annular, two sets of pipe rams, and one set of blind-shear rams.

(3) You handle multiple tubing strings simultaneously, | Four BOPs consisting of an annular, one set of pipe rams, one set of dual pipe rams, and one set of blind-shear rams.

(4) You use a tapered drill pipe, work string, or tubing, | At least one set of pipe rams that are capable of sealing around each size of drill pipe, work string, or tubing. If the expected pressure is greater than 5,000 psi, then you must have at least two sets of pipe rams that are capable of sealing around the larger size drill pipe, work string, or tubing. You may substitute one set of variable bore rams for two sets of pipe rams.

(5) You use a surface BOP on a floating facility, | The elements required by § 250.733(b)(1) of this part.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21979, May 15, 2019; 88 FR 87347, Aug. 23, 2023; 91 FR 35352, June 10, 2026]

§ 250.734 What are the requirements for a subsea BOP system?

(a) When you drill or conduct operations with a subsea BOP system, you must install the BOP system before drilling to deepen the well below the surface casing or before conducting operations if the well is already deepened beyond the surface casing point. The District Manager may require you to install a subsea BOP system before drilling or conducting operations below the conductor casing if proposed casing setting depths or local geology indicate the need. The following table outlines your requirements.

When operating with a subsea BOP system, you must: | Additional requirements:

(1) Have at least five remote-controlled, hydraulically operated BOPs; | You must have at least one annular BOP, two BOPs equipped with pipe rams, and two BOPs equipped with shear rams. For the dual ram requirement, you must comply with this requirement no later than April 29, 2021.

(i) Both BOPs equipped with pipe rams must be capable of closing and sealing on the tubular body of any drill pipe, workstring, and tubing under MASP, as defined for the operation, except tubing with exterior control lines and flat packs, a bottom hole assembly that includes heavy-weight pipe or collars, and bottom-hole tools.

(ii) Both shear rams must be capable of shearing at any point along the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines, appropriate area for the liner or casing landing string, shear sub on subsea test tree, and any electric-, wire-, slick-line in the hole; under MASP. At least one shear ram must be capable of sealing the wellbore after shearing under MASP conditions as defined for the operation. Any non-sealing shear ram(s) must be installed below a sealing shear ram(s).

(2) Have an operable redundant pod control system to ensure proper and independent operation of the BOP system;

(3) Have the accumulator capacity, to provide fast closure of the BOP components and to operate all critical functions; | The accumulator capacity must: (i) Close each required shear ram, ram locks, one pipe ram, and disconnect the LMRP. (ii) Have the capability to perform ROV functions within the required times outlined in API Standard 53 with ROV or flying leads. (iii) Have bottles located subsea for the autoshear and deadman (which may be shared between those two systems) to secure the wellbore. These bottles may also be utilized to perform the secondary control system functions (e.g., ROV or acoustic functions). (iv) Perform under MASP conditions as defined for the operation.

(4) Have a subsea BOP stack equipped with remotely operated vehicle (ROV) intervention capability; | You must have the ROV intervention capability to open and close each shear ram, ram locks, one pipe ram, and disconnect the lower marine riser package (LMRP) under MASP conditions as defined for the operation. You must be capable of performing these functions in the response times outlined in API Standard 53 (incorporated by reference, see § 250.198). The ROV panels on the BOP and LMRP must be compliant with API Recommended Practice 17H (incorporated by reference, see § 250.198).

(5) Maintain an ROV and have a trained ROV crew on each rig unit on a continuous basis once BOP deployment has been initiated from the rig until recovered to the surface. The ROV crew must examine all ROV-related well-control equipment (both surface and subsea) to ensure that it is properly maintained and capable of carrying out appropriate tasks during emergency operations; | The crew must be trained in the operation of the ROV. The training must include simulator training on stabbing into an ROV intervention panel on a subsea BOP stack. The ROV crew must be in communication with designated rig personnel who are knowledgeable about the BOP's capabilities.

(6) Provide autoshear, deadman, and EDS systems for dynamically positioned rigs; provide autoshear and deadman systems for moored rigs; | (i) Autoshear system means a safety system that is designed to automatically shut-in the wellbore in the event of a disconnect of the LMRP. This is considered a rapid discharge system.

(ii) Deadman system means a safety system that is designed to automatically shut-in the wellbore in the event of a simultaneous absence of hydraulic supply and signal transmission capacity in both subsea control pods. This is considered a rapid discharge system.

(iii) Emergency Disconnect Sequence (EDS) system means a safety system that is designed to be manually activated to shut-in the wellbore and disconnect the LMRP in the event of an emergency situation. This is considered a rapid discharge system.

(iv) Autoshear/deadman functions and an EDS mode must close, at a minimum, two shear rams in sequence and be capable of performing their expected shearing and sealing action under MASP conditions as defined for the operation.

(v) Your sequencing must allow a sufficient delay when closing your two shear rams in order to provide maximum sealing efficiency.

(7) Demonstrate that any acoustic control system will function in the proposed environment and conditions; | If you choose to use an acoustic control system in addition to the autoshear, deadman, and EDS requirements, you must demonstrate to the District Manager, as part of the information submitted under § 250.731, that the acoustic control system will function in the proposed environment and conditions. The District Manager may require additional information as appropriate to clarify or evaluate the acoustic control system information provided in your demonstration.

(8) Have operational or physical barrier(s) on BOP control panels to prevent accidental disconnect functions; | You must incorporate enable buttons, or a similar feature, on control panels to ensure two-handed operation for all critical functions.

(9) Clearly label all control panels for the subsea BOP system; | Label other BOP control panels, such as hydraulic control panel.

(10) Develop and use a management system for operating the BOP system, including the prevention of accidental or unplanned disconnects of the system; | The management system must include written procedures for operating the BOP stack and LMRP (including proper techniques to prevent accidental disconnection of these components) and minimum knowledge requirements for personnel authorized to operate and maintain BOP components.

(11) Establish minimum requirements for personnel authorized to operate critical BOP equipment; | Personnel must have: (i) Training in deepwater well-control theory and practice according to the requirements of Subparts O and S; and (ii) A comprehensive knowledge of BOP hardware and control systems.

(12) Before removing the marine riser, displace the fluid in the riser with seawater; | You must maintain sufficient hydrostatic pressure or take other suitable precautions to compensate for the reduction in pressure and to maintain a safe and controlled well condition. You must follow the requirements of § 250.720(b).

(13) Install the BOP stack in a well cellar when in an ice-scour area; | Your well cellar must be deep enough to ensure that the top of the stack is below the deepest probable ice-scour depth.

(14) Install at least two side outlets for a choke line and two side outlets for a kill line; | (i) If your stack does not have side outlets, you must install a drilling spool with side outlets. (ii) Each side outlet must have two full-bore, full-opening valves. (iii) The valves must hold pressure from both directions and must be remote-controlled. iv) You must install a side outlet below the lowest sealing shear ram. You may have a pipe ram or rams between the shearing ram and side outlet.

(15) Install a gas bleed line with two valves for the annular preventer no later than April 30, 2018; | (i) The valves must hold pressure from both directions; (ii) If you have dual annulars, you must install the gas bleed line below the upper annular.

(16) Use a BOP system that has the following mechanisms and capabilities; | (i) No later than May 1, 2023, you must have the capability to position the entire pipe completely within the area of the shearing blade. This capability cannot be a separate ram BOP or annular preventer, but you may use those during a planned shear. (ii) If your control pods contain a subsea electronic module with batteries, a mechanism for personnel on the rig to monitor the state of charge of the subsea electronic module batteries in the BOP control pods.

(b) If you suspend operations to make repairs to any part of the subsea BOP system, you must stop operations at a safe downhole location. Before resuming operations you must:

(1) Submit a revised permit with a written statement from an independent third party documenting the repairs and certifying that the previous certification in § 250.731(c) remains valid;

(2) Upon relatch of the BOP, perform an initial subsea BOP test in accordance with § 250.737(d)(4), including deadman in accordance with § 250.737(d)(12)(vi). If repairs take longer than 30 days, once the BOP is on deck, you must test in accordance with the requirements of § 250.737;

(3) Upon relatch of the LMRP, you must test according to the following:

(i) Pressure test riser connector/gasket in accordance with § 250.737(b) and (c);

(ii) Pressure test choke and kill stabs at LMRP/BOP interface in accordance with § 250.737(b) and (c);

(iii) Full function test of both pods and both control panels;

(iv) Verify acoustic pod communication (if equipped); and

(v) Deadman test with pressure test in accordance with § 250.737(d)(12)(vi).

(4) Receive approval from the District Manager.

(c) If you plan to drill a new well with a subsea BOP, you do not need to submit with your APD the verifications required by this subpart for the open water drilling operation. Before drilling out the surface casing, you must submit for approval a revised APD, including the verifications required in this subpart.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21980, May 15, 2019; 88 FR 57408, Aug. 23, 2023; 91 FR 35352, June 10, 2026]

§ 250.735 What associated systems and related equipment must all BOP systems include?

All BOP systems must include the following associated systems and related equipment:

(a) An accumulator system, as specified in API Standard 53 (incorporated by reference, see § 250.198). Your accumulator system must have the fluid volume capacity and appropriate pre-charge pressures in accordance with API Standard 53. If you supply the accumulator regulators by rig air and do not have a secondary source of pneumatic supply, you must equip the regulators with manual overrides or other devices to ensure capability of hydraulic operations if rig air is lost;

(b) An automatic backup to the primary accumulator-charging system. The power source must be independent from the power source for the primary accumulator-charging system. The independent power source must possess sufficient capability to close and hold closed all BOP components under MASP conditions as defined for the operation;

(c) At least two full BOP control stations. One station must be on the rig floor. You must locate the other station in a readily accessible location away from the rig floor;

(d) The choke line(s) installed above the bottom well-control ram;

(e) The kill line must be installed beneath at least one well-control ram, and may be installed below the bottom ram;

(f) A fill-up line above the uppermost BOP;

(g) Locking devices for all BOP sealing rams (i.e., blind shear rams, pipe rams and variable bore rams), as follows:

(1) For subsea BOPs, hydraulic locking devices must be installed on all sealing rams;

(2) For surface BOPs:

(i) Remotely-operated locking devices must be installed on blind shear rams no later than April 29, 2019;

(ii) Manual or remotely-operated locking devices must be installed on pipe rams and variable bore rams; and

(h) A wellhead assembly with a RWP that exceeds the maximum anticipated wellhead pressure.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21981, May 15, 2019; 91 FR 35352, June 10, 2026]

§ 250.736 What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves?

(a) Your BOP system must include a choke manifold that is suitable for the anticipated surface pressures, anticipated methods of well control, the surrounding environment, and the corrosiveness, volume, and abrasiveness of drilling fluids and well fluids that you may encounter.

(b) Choke manifold components must have a RWP at least as great as the RWP of the ram BOPs. If your choke manifold has buffer tanks downstream of choke assemblies, you must install isolation valves on any bleed lines.

(c) Valves, pipes, flexible steel hoses, and other fittings upstream of the choke manifold must have a RWP at least as great as the RWP of the ram BOPs.

(d) You must use the following BOP equipment with a RWP and temperature of at least as great as the working pressure and temperature of the ram BOP during all operations:

(1) The applicable kelly-type valves as described in API Standard 53 (incorporated by reference, see § 250.198);

(2) On a top-drive system equipped with a remote-controlled valve, a strippable kelly-type valve must be installed below the remote-controlled valve;

(3) An inside BOP in the open position located on the rig floor. You must be able to install an inside BOP for each size connection in the pipe;

(4) A drill string safety valve in the open position located on the rig floor. You must have a drill-string safety valve available for each size connection in the pipe;

(5) When running casing, a safety valve in the open position available on the rig floor to fit the casing string being run in the hole. For subsea BOPs, the safety valve must be available on the rig floor if the length of casing being run exceeds the water depth, which would result in the casing being across the BOP stack and the rig floor prior to crossing over to the drill pipe running string;

(6) All required manual and remote- controlled kelly-type valves, drill-string safety valves, and comparable-type valves (i.e., kelly-type valve in a top-drive system) that are essentially full opening; and

(7) A wrench to fit each manual valve. Each wrench must be readily accessible to the drilling crew.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21981, May 15, 2019; 91 FR 35352, June 10, 2026]

§ 250.737 What are the BOP system testing requirements?

Your BOP system (this includes the choke manifold, kelly-type valves, inside BOP, and drill string safety valve) must meet the following testing requirements:

(a) Pressure test frequency. You must pressure test your BOP system:

(1) When installed;

(2) Before 14 days have elapsed since your last BOP pressure test, or 30 days since your last blind shear ram BOP pressure test. You must begin to test your BOP system before midnight on the 14th day (or 30th day for your blind shear rams) following the conclusion of the previous test;

(3) Before drilling out each string of casing or a liner. You may omit this pressure test requirement if you did not remove the BOP stack to run the casing string or liner, the required BOP test pressures for the next section of the hole are not greater than the test pressures for the previous BOP test, and the time elapsed between tests has not exceeded 14 days (or 30 days for blind shear rams). You must indicate in your APD which casing strings and liners meet these criteria;

(4) In lieu of meeting the schedule established in paragraph (a)(2) of this section, you may request that BSEE approve a 21-day BOP testing frequency. To obtain BSEE approval, you must submit a request to the appropriate BSEE Regional Supervisor, District Field Operations. Your request must demonstrate that you have developed a BOP health monitoring plan that includes certain system capabilities. As long as your plan is consistent with recognized engineering and industry practice, BSEE will approve your request if it includes the following:

(i) Condition monitoring tools, including continuous surveillance of sensor readings from the BOP control system, real-time condition analysis and displays, functional pressure signal analysis, historical sensor data;

(ii) Failure propagation analysis;

(iii) A failure tracking and resolution system that includes detailed failure reports and identification of recurring problems; and

(iv) Submission of quarterly reports of the data collected pursuant to paragraphs (a)(4)(i)(iii) to the BSEE Regional Supervisor, District Field Operations.

(5) The District Manager may require more frequent testing if conditions or your BOP performance warrant.

(b) Pressure test procedures. When you pressure test the BOP system, you must conduct a low-pressure test and a high-pressure test for each BOP component (excluding test rams and non-sealing shear rams). You must begin each test by conducting the low-pressure test then transition to the high-pressure test. Each individual pressure test must hold pressure long enough to demonstrate the tested component(s) holds the required pressure. The table in this paragraph (b) outlines your pressure test requirements.

You must conduct a . . . | According to the following procedures . . .

(1) Low-pressure test | All low-pressure tests must be between 250 and 350 psi. Any initial pressure above 350 psi must be bled back to a pressure between 250 and 350 psi before starting the test. If the initial pressure exceeds 500 psi, you must bleed back to zero and reinitiate the test.

(2) High-pressure test for blind shear ram-type BOPs, ram-type BOPs, the choke manifold, outside of all choke and kill side outlet valves (and annular gas bleed valves for subsea BOP), inside of all choke and kill side outlet valves below uppermost ram, and other BOP components | (i) The high-pressure test must equal the RWP of the equipment or be 500 psi greater than your calculated MASP, as defined for the operation for the applicable section of hole. Before you may test BOP equipment to the MASP plus 500 psi, the District Manager must have approved those test pressures in your permit. (ii) The blind shear ram (BSR) must be tested to: (A) MASP plus 500 psi for the hole section to which it is exposed; or (B) Full well MASP plus 500 psi on initial latch up and all subsequent BSR pressure tests can be done to the casing/liner test pressure for the applicable hole section. (iii) The choke and kill side outlet valves must be tested to, except as provided in paragraph (d)(13) of this section: (A) MASP plus 500 psi for the hole section to which it is exposed; or (B) Full well MASP plus 500 psi on initial latch up and all subsequent pressure tests can be done to the casing/liner test pressure for the applicable hole section.

(3) High-pressure test for annular-type BOPs, inside of choke or kill valves (and annular gas bleed valves for subsea BOP) above the uppermost ram BOP | The high pressure test must equal 70 percent of the RWP of the equipment or be 500 psi greater than your calculated MASP, as defined for the operation for the applicable section of hole. Before you may test BOP equipment to the MASP plus 500 psi, the District Manager must have approved those test pressures in your APD or APM.

(c) Duration of pressure test. Each test must hold the required pressure for 5 minutes, which must be recorded on a chart not exceeding 4 hours, or on a digital recorder. However, for surface BOP systems and surface equipment of a subsea BOP system, a 3-minute test duration is acceptable if recorded on a chart not exceeding 4 hours, or on a digital recorder. The recorded test pressures must be within the middle half of the chart range, i.e., cannot be within the lower or upper one-fourth of the chart range. If the equipment does not hold the required pressure during a test, you must correct the problem and retest the affected component(s).

(d) Additional test requirements. You must meet the following additional BOP testing requirements:

You must . . . | Additional requirements . . .

(1) Follow the testing requirements of API Standard 53 (incorporated by reference, see § 250.198) | If there is a conflict between API Standard 53, testing requirements and this section, you must follow the requirements of this section.

(2) Use water to test a surface BOP system on the initial test. You may use drilling/completion/workover fluids to conduct subsequent tests of a surface BOP system | (i) You must submit test procedures with your APD or APM for District Manager approval.

(ii) Contact the District Manager at least 72 hours prior to beginning the initial test to allow BSEE representative(s) to witness the testing. If BSEE representative(s) are unable to witness the testing, you must provide the initial test results to the appropriate District Manager within 72 hours after completion of the tests.

(3) Stump test a subsea BOP system before installation | (i) You must use water to conduct this test. You may use drilling/completion/workover fluids to conduct subsequent tests of a subsea BOP system.

(ii) You must submit test procedures with your APD or APM for District Manager approval

(iii) Contact the District Manager at least 72 hours prior to beginning the stump test to allow BSEE representative(s) to witness the testing. If BSEE representative(s) are unable to witness the testing, you must provide the test results to the appropriate District Manager within 72 hours after completion of the tests.

(iv) You must verify closure of all ROV intervention functions on your subsea BOP stack during the stump test.

(v) You must follow paragraphs (b) and (c) of this section. Pressure testing of each ram and annular component is only required once.

(4) Perform an initial subsea BOP test | (i) You must begin the initial subsea BOP test on the seafloor within 30 days of the stump test.

(ii) You must submit test procedures with your APD or APM for District Manager approval.

(iii) You must pressure test well-control rams and annulars according to paragraphs (b) and (c) of this section.

(iv) You must notify the District Manager at least 72 hours prior to beginning the initial subsea test for the BOP system to allow BSEE representative(s) to witness testing.

(v) You must test and verify closure of at least one set of rams during the initial subsea test through a ROV hot stab. You must confirm closure of the selected ram through the ROV hot stab with a 1,000 psi pressure test for 5 minutes.

(5) Alternate tests between control stations | (i) For two complete BOP control stations you must: (A) Designate a primary and secondary station; (B) Alternate testing between the primary and secondary control stations on a weekly basis; and (C) For a subsea BOP, develop an alternating testing schedule to ensure the primary and secondary control stations will function each pod.

(ii) Remote panels where all BOP functions are not included (e.g., life boat panels) must be function-tested upon the initial BOP tests.

(6) Pressure test variable bore-pipe ram BOPs against pipe sizes according to API Standard 53, excluding the bottom hole assembly that includes heavy-weight pipe or collars and bottom-hole tools

(7) Pressure test annular type BOPs against pipe sizes according to API Standard 53

(8) Pressure test affected BOP components following the disconnection or repair of any well-pressure containment seal in the wellhead or BOP stack assembly

(9) Function test annular and pipe/variable bore ram BOPs every 7 days between pressure tests

(10) Function test shear ram(s) BOPs every 14 days | If BSEE approves your request to utilize a 21-day BOP test frequency pursuant to § 250.737(a)(4), you may function test shear ram(s) BOPs every 21 days in accordance with the terms of that approval.

(11) Actuate safety valves assembled with proper casing connections before running casing

(12) Function test autoshear/deadman, and EDS systems separately on your subsea BOP stack during the stump test. The District Manager may require additional testing of the emergency systems. You must also test the deadman system and verify closure of the shearing rams during the initial test on the seafloor | (i) You must submit test procedures with your APD or APM for District Manager approval. The procedures for these function tests must include the schematics of the actual controls and circuitry of the system that will be used during an actual autoshear or deadman event. (ii) The procedures must also include the actions and sequence of events that take place on the approved schematics of the BOP control system and describe specifically how the ROV will be utilized during this operation. (iii) When you conduct the initial deadman system test on the seafloor, you must ensure the well is secure and, if hydrocarbons have been present, appropriate barriers are in place to isolate hydrocarbons from the wellhead. You must also have an ROV on bottom during the test. (iv) Following the deadman system test on the seafloor you must document the final remaining pressure of the subsea accumulator system. (v) For the function test of the deadman system during the initial test on the seafloor, you must have the ability to quickly disconnect the LMRP should the rig experience a loss of station-keeping event. You must include your quick-disconnect procedures with your deadman test procedures. (vi) You must confirm closure of the BSR(s) with a 1,000 psi pressure test for 5 minutes. (vii) If a casing shear ram is installed, you must describe how you will verify closure of the ram. (viii) You must document all your test results and make them available to BSEE upon request.

(13) Pressure test the choke and kill side outlet valves | According to paragraph (b) of this section, except as follows: (i) Test the wellbore side of the choke and kill side outlet valves above the uppermost pipe ram to the approved annular test pressure. Choke and kill side outlet valves below the uppermost pipe ram must be tested to MASP plus 500 psi for the applicable hole section. (ii) For the 30 day BSR testing, test the wellbore side of the choke and kill side outlet valves between the upper most pipe ram and the upper most ram, to the casing/liner test pressure or annular test pressure, whichever is greater. (iii) For BOPs with only one choke and kill side outlet valve, you are only required to pressure test the choke and kill side outlet valves from the wellbore side.

(e) Prior to conducting any shear ram tests in which you will shear pipe, you must notify the District Manager at least 72 hours in advance, to ensure that a BSEE representative will have access to the location to witness any testing.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21981, May 15, 2019; 88 FR 57348, Aug. 23, 2023; 91 FR 35352, June 10, 2026]

§ 250.738 What must I do in certain situations involving BOP equipment or systems?

The table in this section describes actions that you must take when certain situations occur with BOP systems.

If you encounter the following situation: | Then you must . . .

(a) BOP equipment does not hold the required pressure during a test; | Correct the problem and retest the affected equipment. You must report any problems or irregularities, including any leaks, on the daily report as required in § 250.746.

(b) Need to repair, replace, or reconfigure a surface BOP or subsea BOP system; | (1) First place the well in a safe, controlled condition as approved by the District Manager (e.g., before drilling out a casing shoe or after setting a cement plug, bridge plug, or a packer).

(2) Any repair or replacement parts must be manufactured under a quality assurance program and must meet or exceed the performance of the original part produced by the OEM.

(3) Submit a revised permit with a written statement from an independent third party documenting the repairs, replacement, or reconfiguration and certifying that the previous certification under § 250.731(c) remains valid.

(4) You must receive approval from the District Manager prior to resuming operations.

(c) Need to postpone a BOP test due to well-control problems such as lost circulation, formation fluid influx, or stuck pipe; | Record the reason for postponing the test in the daily report and conduct the required BOP test after the first trip out of the hole.

(d) BOP control station or pod that does not function properly; | Suspend operations until that station or pod is operable. You must report any problems or irregularities, including any leaks, to the District Manager.

(e) Plan to operate with a tapered string; | Install two or more sets of conventional or variable-bore pipe rams in the BOP stack to provide for the following: two sets of rams must be capable of sealing around the larger-size drill string and one set of pipe rams must be capable of sealing around the smaller size pipe, excluding the bottom hole assembly that includes heavy weight pipe or collars and bottom-hole tools.

(f) Plan to install casing rams or casing shear rams in a surface BOP stack; | Before running casing, perform a shell test to the permit approved test pressure of the BOP component above the casing ram/casing shear. If this installation was not included in your approved permit, and changes the BOP configuration approved in the APD or APM, you must notify and receive approval from the District Manager.

(g) Plan to use an annular BOP with a RWP less than the anticipated surface pressure; | Demonstrate that your well-control procedures or the anticipated well conditions will not place demands above its RWP and obtain approval from the District Manager.

(h) Plan to use a subsea BOP system in an ice-scour area; | Install the BOP stack in a well cellar. The well cellar must be deep enough to ensure that the top of the stack is below the deepest probable ice-scour depth.

(i) You activate any shear ram and pipe or casing is sheared; | Retrieve, physically inspect, and conduct a full pressure test of the BOP stack after the situation is fully controlled. You must submit to the District Manager a report from an independent third party certifying that the BOP is fit to return to service.

(j) Need to remove the BOP stack; | Have a minimum of two barriers in place prior to BOP removal. You must obtain approval from the District Manager of the two barriers prior to removal and the District Manager may require additional barriers and test(s).

(k) In the event of a deadman or autoshear activation, if there is a possibility of the blind shear ram opening immediately upon re-establishing power to the BOP stack; | Place the blind shear ram opening function in the block position prior to re-establishing power to the stack. Contact the District Manager and receive approval of procedures for re-establishing power and functions prior to latching up the BOP stack or re-establishing power to the stack.

(l) If a test ram is to be used; | The wellhead/BOP connection must be tested to the MASP plus 500 psi for the hole section to which it is exposed. This can be done by:

(1) Testing wellhead/BOP connection to the MASP plus 500 psi for the well upon installation;

(2) Pressure testing each casing to the MASP plus 500 psi for the next hole section; or

(3) Some combination of paragraphs (l)(1) and (2) of this section.

(m) Plan to utilize any other circulating or ancillary equipment (e.g., but not limited to, subsea isolation device, subsea accumulator module, or gas handler) that is in addition to the equipment required in this subpart; | Contact the District Manager and request approval in your APD or APM. Your request must include a report from an independent third party on the equipment's design and suitability for its intended use as well as any other information required by the District Manager. The District Manager may impose any conditions regarding the equipment's capabilities, operation, and testing.

(n) You have pipe/variable bore rams that have no current utility or well-control purposes; | Indicate in your APD or APM which pipe/variable bore rams meet these criteria and clearly label them on all BOP control panels. You do not need to function test or pressure test pipe/variable bore rams having no current utility, and that will not be used for well-control purposes, until such time as they are intended to be used during operations.

(o) You install redundant components for well control in your BOP system that are in addition to the required components of this subpart (e.g., pipe/variable bore rams, shear rams, annular preventers, gas bleed lines, and choke/kill side outlets or lines); | Comply with all testing, maintenance, and inspection requirements in this subpart that are applicable to those well-control components. If any redundant component fails a test, you must submit a report from an independent third party that describes the failure and confirms that there is no impact on the BOP that will make it unfit for well-control purposes. You must submit this report to the District Manager and receive approval before resuming operations. The District Manager may require you to provide additional information as needed to clarify or evaluate your report.

(p) Need to position the bottom hole assembly, including heavy-weight pipe or collars, and bottom-hole tools across the BOP for tripping or any other operations. | Ensure that the well is stable prior to positioning the bottom hole assembly across the BOP. You must have, as part of your well-control plan required by § 250.710, procedures that enable the removal of the bottom hole assembly from across the BOP in the event of a well-control or emergency situation (for dynamically positioned rigs, your plan must also include steps for when the EDS must be activated) before MASP conditions are reached as defined for the operation.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21983, May 15, 2019]

§ 250.739 What are the BOP maintenance and inspection requirements?

(a) You must maintain and inspect your BOP system to ensure that the equipment functions as designed. The BOP maintenance and inspections must meet or exceed any OEM recommendations, recognized engineering practices, and industry standards incorporated by reference into the regulations of this subpart, including API Standard 53 (incorporated by reference, see § 250.198). You must document how you met or exceeded the provisions of API Standard 53, maintain complete records to ensure the traceability of BOP stack equipment beginning at fabrication, and record the results of your BOP inspections and maintenance actions. You must make all records available to BSEE upon request.

(b) A major, detailed inspection of the well control system components (including but not limited to riser, BOP, LMRP, and control pods) must be performed every 5 years. This major inspection may be performed in phased intervals. You must track and document all system and component inspection dates. These records must be available on the rig. An independent third party is required to review the inspection results and must compile a detailed report of the inspection results, including descriptions of any problems and how they were corrected. You must make these reports available to BSEE upon request. This major inspection must be performed every 5 years from the following applicable dates, whichever is later:

(1) The date the equipment owner accepts delivery of a new build drilling rig with a new BOP system;

(2) The date the new, repaired, or remanufactured equipment is initially installed into the system; or

(3) The date of the last 5 year inspection for the component.

(c) You must visually inspect your surface BOP system on a daily basis. You must visually inspect your subsea BOP system, marine riser, and wellhead at least once every 3 days if weather and sea conditions permit. You may use cameras to inspect subsea equipment.

(d) You must ensure that all personnel maintaining, inspecting, or repairing BOPs, or critical components of the BOP system, are trained in accordance with applicable training requirements in subpart S of this part, any applicable OEM criteria, recognized engineering practices, and industry standards incorporated by reference in this subpart.

(e) You must make all records available to BSEE upon request. You must ensure that the rig unit owner maintains the BOP maintenance, inspection, and repair records on the rig unit for 2 years from the date the records are created or for a longer period if directed by BSEE. You must ensure that all equipment schematics, maintenance, inspection, and repair records are located at an onshore location for the service life of the equipment.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21983, May 15, 2019; 91 FR 35352, June 10, 2026]

101 Records and Reporting
§ 250.740 What records must I keep?

You must keep a daily report consisting of complete, legible, and accurate records for each well. You must keep records onsite while well operations continue. After completion of operations, you must keep all operation and other well records for the time periods shown in § 250.741 at a location of your choice, except as required in § 250.746. The records must contain complete information on all of the following:

(a) Well operations, all testing conducted, and any real-time monitoring data as required by § 250.724;

(b) Descriptions of formations penetrated;

(c) Content and character of oil, gas, water, and other mineral deposits in each formation;

(d) Kind, weight, size, grade, and setting depth of casing;

(e) All well logs and surveys run in the wellbore;

(f) Any significant malfunction or problem; and

(g) All other information required by the District Manager as appropriate to ensure compliance with the requirements of this section and to enable BSEE to determine that the well operations are consistent with conservation of natural resources and protection of safety and the environment on the OCS.

§ 250.741 How long must I keep records?

You must keep records for the time periods shown in the following table.

You must keep records relating to . . . | Until . . .

(a) Drilling; | 90 days after you complete operations.

(b) Casing and liner pressure tests, diverter tests, BOP tests, and real-time monitoring data; | 2 years after the completion of operations.

(c) Completion of a well or of any workover activity that materially alters the completion configuration or affects a hydrocarbon-bearing zone. | You permanently plug and abandon the well or until you assign the lease and forward the records to the assignee.

§ 250.742 What well records am I required to submit?

You must submit to BSEE copies of logs or charts of electrical, radioactive, sonic, and other well logging operations; directional and vertical well surveys; velocity profiles and surveys; and analysis of cores. Each Region will provide specific instructions for submitting well logs and surveys.

§ 250.743 What are the well activity reporting requirements?

(a) For operations in the BSEE Gulf of America (GOA) OCS Region, you must submit Form BSEE-0133, Well Activity Report (WAR), to the District Manager on a weekly basis. The reporting week is defined as beginning on Sunday (12 a.m.) and ending on the following Saturday (11:59 p.m.). This reporting week corresponds to a week (Sunday through Saturday) on a standard calendar. Report any well operations that extend past the end of this weekly reporting period on the next weekly report. The reporting period for the weekly report is never longer than 7 days, but could be less than 7 days for the first reporting period and the last reporting period for a particular well operation. Submit each WAR and accompanying Form BSEE-0133S, Open Hole Data Report, to the BSEE GOA-OCS Region no later than close of business on the Friday immediately after the closure of the reporting week. The District Manager may require more frequent submittal of the WAR on a case-by-case basis.

(b) For operations in the Pacific or Alaska OCS Regions, you must submit Form BSEE-0133, WAR, to the District Manager on a daily basis.

(c) The WAR must include a description of the operations conducted, any abnormal or significant events that affect the permitted operation each day within the report from the time you begin operations to the time you end operations, any verbal approval received, the well's as-built drawings, casing, fluid weights, shoe tests, test pressures at surface conditions, and any other information concerning well activities required by the District Manager. For casing cementing operations, indicate type of returns (i.e., full, partial, or none). If partial or no returns are observed, you must indicate how you determined the top of cement. For each report, indicate the operation status for the well at the end of the reporting period. On the final WAR, indicate the status of the well (completed, temporarily abandoned, permanently abandoned, or drilling suspended) and the date you finished such operations.

[81 FR 26022, Apr. 29, 2016, as amended at 90 FR 44326, Sept. 15, 2025]

§ 250.744 What are the end of operation reporting requirements?

(a) Within 30 days after completing operations, except routine operations as defined in § 250.601, you must submit Form BSEE-0125, End of Operations Report (EOR), to the District Manager. The EOR must include: a listing, with top and bottom depths, of all hydrocarbon zones and other zones of porosity encountered with any cored intervals; details on any drill-stem and formation tests conducted; documentation of successful negative pressure testing on wells that use a subsea BOP stack or wells with mudline suspension systems; and an updated schematic of the full wellbore configuration. The schematic must be clearly labeled and show all applicable top and bottom depths, locations and sizes of all casings, cut casing or stubs, casing perforations, casing rupture discs (indicate if burst or collapse and rating), cemented intervals, cement plugs, mechanical plugs, perforated zones, completion equipment, production and isolation packers, alternate completions, tubing, landing nipples, subsurface safety devices, and any other information required by the District Manager regarding the end of well operations. The EOR must indicate the status of the well (completed, temporarily abandoned, permanently abandoned, or drilling suspended) and the date of the well status designation. The well status date is subject to the following:

(1) For surface well operations and riserless subsea operations, the operations end date is subject to the discretion of the District Manager; and

(2) For subsea well operations, the operations end date is considered to be the date the BOP is disconnected from the wellhead unless otherwise specified by the District Manager.

(b) You must submit public information copies of Form BSEE-0125 according to § 250.186(b).

§ 250.745 What other well records could I be required to submit?

The District Manager or Regional Supervisor may require you to submit copies of any or all of the following well records:

(a) Well records as specified in § 250.740;

(b) Paleontological interpretations or reports identifying microscopic fossils by depth and/or washed samples of drill cuttings that you normally maintain for paleontological determinations. The Regional Supervisor may issue a Notice to Lessees that sets forth the manner, timeframe, and format for submitting this information;

(c) Service company reports on cementing, perforating, acidizing, testing, or other similar services; or

(d) Other reports and records of operations.

§ 250.746 What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers?

You must record the time, date, and results of all casing and liner pressure tests. You must also record pressure tests, actuations, and inspections of the BOP system, system components, and marine riser in the daily report described in § 250.740. In addition, you must:

(a) Record test pressures on pressure charts or digital recorders;

(b) Require your onsite lessee representative, designated rig or contractor representative, and pump operator to sign and date the pressure charts or digital recordings and daily reports as correct;

(c) Document on the daily report the sequential order of BOP and auxiliary equipment testing and the pressure and duration of each test. For subsea BOP systems, you must also record the closing times for annular and ram BOPs. You may reference a BOP test plan if it is available at the facility;

(d) Identify on the daily report the control station and pod used during the test (identifying the pod does not apply to coiled tubing and snubbing units);

(e) Identify on the daily report any problems or irregularities observed during BOP system testing and record actions taken to remedy the problems or irregularities. Any leaks associated with the BOP or control system during testing must be documented in the WAR. If any problems that cannot be resolved promptly are observed during testing, operations must be suspended until the District Manager determines that you may continue; and

(f) Retain all records, including pressure charts, daily reports, and referenced documents pertaining to tests, actuations, and inspections at the rig unit for the duration of the operation. After completion of the operation, you must retain all the records listed in this section for a period of 2 years at the rig unit. You must also retain the records at the lessee's field office nearest the facility or at another location available to BSEE. You must make all the records available to BSEE upon request.

102 Coiled Tubing Operations
§ 250.750 What are the coiled tubing requirements?

(a) For coiled tubing operations, you must follow the applicable requirements of this subpart and you must meet the following minimum requirements for the BOP system:

(1) BOP system components must be in the following order from the top down:

BOP system when expected surface pressures are less than or equal to 3,500 psi | BOP system when expected surface pressures are greater than 3,500 psi | BOP system for wells with returns taken through an outlet on the BOP stack

(i) Stripper or annular-type well control component | Stripper or annular-type well control component | Stripper or annular-type well control component.

(ii) Hydraulically-operated blind rams | Hydraulically-operated blind rams | Hydraulically-operated blind rams.

(iii) Hydraulically-operated shear rams | Hydraulically-operated shear rams | Hydraulically-operated shear rams.

(iv) Kill line inlet | Kill line inlet | Kill line inlet.

(v) Hydraulically-operated two-way slip rams | Hydraulically-operated two-way slip rams | Hydraulically-operated two-way slip rams. Hydraulically-operated pipe rams.

(vi) Hydraulically-operated pipe rams | Hydraulically-operated pipe rams Hydraulically-operated blind-shear rams. These rams should be located as close to the tree as practical | A flow tee or cross. Hydraulically-operated pipe rams. Hydraulically-operated blind-shear rams on wells with surface pressures >3,500 psi. As an option, the pipe rams can be placed below the blind-shear rams. The blind-shear rams should be located as close to the tree as practical.

(2) You may use a set of hydraulically-operated combination rams for the blind rams and shear rams.

(3) You may use a set of hydraulically-operated combination rams for the hydraulic two-way slip rams and the hydraulically-operated pipe rams.

(4) You must attach a dual check valve assembly to the coiled tubing connector at the downhole end of the coiled tubing string for all coiled tubing operations. If you plan to conduct operations without downhole check valves, you must describe alternate procedures and equipment in Form BSEE-0124, Application for Permit to Modify and have it approved by the District Manager.

(5) You must have a kill line and a separate choke line. You must equip each line with two full-opening valves and at least one of the valves must be remotely controlled. You may use a manual valve instead of the remotely controlled valve on the kill line if you install a check valve between the two full-opening manual valves and the pump or manifold. The valves must have a working pressure rating equal to or greater than the working pressure rating of the connection to which they are attached, and you must install them between the well control stack and the choke or kill line. For operations with expected surface pressures greater than 3,500 psi, the kill line must be connected to a pump or manifold. You must not use the kill line inlet on the BOP stack for taking fluid returns from the wellbore.

(6) You must have a hydraulic-actuating system that provides sufficient accumulator capacity to close-open-close each component in the BOP stack. This cycle must be completed with at least 200 psi above the pre-charge pressure, without assistance from a charging system.

(7) All connections used in the surface BOP system from the tree to the uppermost required ram must be flanged, including the connections between the well control stack and the first full-opening valve on the choke line and the kill line.

(b) BSEE considers all coiled tubing operations to be non-routine.

[84 FR 21983, May 15, 2019]

§ 250.751 Coiled tubing testing requirements.

You must test the coiled tubing unit in accordance with § 250.737(a), (b), (c), (d)(9), and (d)(10). You must successfully pressure test the dual check valves to the rated working pressure of the connector, the rated working pressure of the dual check valve, expected surface pressure, or the collapse pressure of the coiled tubing, whichever is less. The test interval for coiled tubing operations must include a 10 minute high-pressure test for the coiled tubing string.

[84 FR 21984, May 15, 2019]

103 Snubbing Operations
§ 250.760 What are the snubbing requirements?

(a) For snubbing operations, you must follow the applicable requirements of this subpart and have the following minimum BOP-system components:

(1) One set of pipe rams hydraulically operated,

(2) Two sets of stripper-type pipe rams hydraulically operated with spacer spool,

(3) An inside BOP or a spring-loaded, back-pressure safety valve in the open position located on the rig floor, and

(4) An essentially full-opening, work-string safety valve in the open position must be maintained on the rig floor at all times and a wrench to fit the work-string safety valve must be readily available.

(5) Proper connections must be readily available for inserting valves in the work string.

(b) Test the snubbing unit in accordance with § 250.737(a), (b), and (c).

[84 FR 21984, May 15, 2019]

Subpart H Oil and Gas Production Safety Systems

Source: 81 FR 61918, Sept. 7, 2016, unless otherwise noted.

104 General Requirements
§ 250.800 General.

(a) You must design, install, use, maintain, and test production safety equipment in a manner to ensure the safety and protection of the human, marine, and coastal environments. For production safety systems operated in subfreezing climates, you must use equipment and procedures that account for floating ice, icing, and other extreme environmental conditions that may occur in the area. Before you commence production on a new production facility:

(1) BSEE must approve your production safety system application, as required in § 250.842.

(2) You must request a preproduction inspection by notifying the District Manager at least 72 hours before you plan to commence initial production, as required under § 250.880(a)(1).

(b) For all new production systems on fixed leg platforms, you must comply with API Recommended Practice 14J (incorporated by reference, see § 250.198);

(c) For all new floating production systems (FPSs) (e.g., column-stabilized-units (CSUs); floating production, storage and offloading facilities (FPSOs); tension-leg platforms (TLPs); and spars), you must:

(1) Comply with API Recommended Practice 14J;

(2) Meet the production riser standards of API Recommended Practice 2RD (incorporated by reference, see § 250.198), provided that you may not install single bore production risers from floating production facilities;

(3) Design all stationkeeping (i.e., anchoring and mooring) systems for floating production facilities to meet the standards of API Recommended Practice 2SK and API Recommended Practice 2SM (both incorporated by reference, see § 250.198); and

(4) Design stationkeeping (i.e., anchoring and mooring) systems for floating facilities to meet the structural requirements of §§ 250.900 through 250.921.

(d) If there are any conflicts between the documents incorporated by reference and the requirements of this subpart, you must follow the requirements of this subpart.

(e) You may use alternate procedures or equipment during operations after receiving approval from the District Manager. You must present your proposed alternate procedures or equipment as required by § 250.141.

(f) You may apply for a departure from the operating requirements of this subpart as provided by § 250.142. Your written request must include a justification showing why the departure is necessary and appropriate.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49256, Sept. 28, 2018; 91 FR 35352, June 10, 2026]

§ 250.801 Safety and pollution prevention equipment (SPPE) certification.

(a) SPPE equipment. You must install only safety and pollution prevention equipment (SPPE) considered certified under paragraph (b) of this section or accepted under paragraph (c) of this section. BSEE considers the following equipment to be types of SPPE:

(1) Surface safety valves (SSV) and actuators, including those installed on injection wells capable of natural flow;

(2) Boarding shutdown valves (BSDV) and their actuators. For subsea wells, the BSDV is the surface equivalent of an SSV on a surface well;

(3) Underwater safety valves (USV) and actuators;

(4) Subsurface safety valves (SSSV) and associated safety valve locks and landing nipples; and

(5) Gas lift shutdown valves (GLSDV) and their actuators associated with subsea systems.

(b) Certification of SPPE. SPPE that is manufactured and marked pursuant to ANSI/API Specification Q1 (incorporated by reference, see § 250.198), is considered as certified SPPE under this part. All other SPPE is considered as not certified, unless approved in accordance with paragraph (c) of this section.

(c) Accepting SPPE manufactured under other quality assurance programs. BSEE may exercise its discretion to accept SPPE manufactured under a quality assurance program other than ANSI/API Specification Q1, provided that the alternative quality assurance program is verified as equivalent to ANSI/API Specification Q1 by an appropriately qualified entity and that the operator submits a request to BSEE containing relevant information about the alternative program and receives BSEE approval. In addition, an operator may request that BSEE accept SPPE that is marked with a third-party certification mark other than the API monogram. All requests under this paragraph should be submitted to the Chief, Office of Offshore Regulatory Programs; Bureau of Safety and Environmental Enforcement; VAE-ORP; 45600 Woodland Road, Sterling, VA 20166.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49256, Sept. 28, 2018; 91 FR 35353, June 10, 2026]

§ 250.802 Requirements for SPPE.

(a) All SSVs, BSDVs, USVs, and GLSDVs and their actuators must meet all of the specifications contained in API Specification 6A and API Standard 6AV1 (both incorporated by reference, see § 250.198).

(b) All SSSVs and their actuators must meet all of the specifications and recommended practices of ANSI/API Specification 14A and ANSI/API Recommended Practice 14B, including all annexes (both incorporated by reference, see § 250.198). Subsurface-controlled SSSVs are not allowed on subsea wells.

(c) Requirements derived from the documents incorporated in this section for SSVs, BSDVs, SSSVs, USVs, GLSDVs, and their actuators, include, but are not limited to, the following:

(1) You must ensure that each device is designed to function in the conditions to which it may be exposed; including temperature, pressure, flow rates, and environmental conditions.

(i) The device design must be tested by an independent test agency according to the test requirements in the appropriate standard for that device (API Standard 6AV1 or ANSI/API Specification 14A), as identified in paragraphs (a) and (b) of this section.

(ii) You must maintain a description of the process you used to ensure the device is designed to function as required in paragraphs (a) and (c)(1) of this section and provide that description to BSEE upon request.

(iii) If you remove any SPPE from service and install the device at a different location, you must have a qualified third party review and certify that each device will function as designed under the conditions to which it may be exposed.

(2) All materials and parts must meet the original equipment manufacturer specifications and acceptance criteria.

(3) The device must pass applicable validation tests and functional tests performed by an API-licensed test agency.

(4) You must have requalification testing performed following manufacture design changes.

(5) You must comply with and document all manufacturing, traceability, quality control, and inspection requirements.

(6) You must follow specified installation, testing, and repair protocols.

(7) You must use only qualified parts, procedures, and personnel to repair or redress equipment.

(d) You must install and use SPPE according to the following table.

If . . . | Then . . .

(1) You need to install any SPPE | You must install SPPE that conforms to § 250.801.

(2) A non-certified SPPE is already in service | It may remain in service.

(3) A non-certified SPPE requires offsite repair, re-manufacturing, or any hot work such as welding | You must replace it with SPPE that conforms to § 250.801.

(e) You must retain all documentation related to the manufacture, installation, testing, repair, redress, and performance of the SPPE until 1 year after the date of decommissioning of the equipment.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49256, Sept. 28, 2018; 91 FR 35353, June 10, 2026]

§ 250.803 What SPPE failure reporting procedures must I follow?

(a) You must follow the failure reporting requirements contained in section 10.20.7.4 of API Specification 6A (incorporated by reference, see § 250.198) for SSVs, BSDVs, GLSDVs and USVs. You must follow the failure reporting requirements contained in section 7.10 of ANSI/API Specification 14A and Annex F of ANSI/API Recommended Practice 14B (both incorporated by reference, see § 250.198) for SSSVs. Within 30 days after the discovery and identification of the failure, you must provide a written notice of equipment failure to the manufacturer of such equipment and to BSEE through the Chief, Office of Offshore Regulatory Programs, unless BSEE has designated a third party as provided in paragraph (d) of this section. A failure is any condition that prevents the equipment from meeting the functional specification or purpose.

(b) You must ensure that an investigation and a failure analysis are performed within 120 days of the failure to determine the cause of the failure. If the investigation and analyses are performed by an entity other than the manufacturer, you must ensure that the analysis report is submitted to the manufacturer and to BSEE through the Chief, Office of Offshore Regulatory Programs, unless BSEE has designated a third party as provided in paragraph (d) of this section. You must also ensure that the results of the investigation and any corrective action are documented in the analysis report.

(c) If the equipment manufacturer notifies you that it has changed the design of the equipment that failed or if you have changed operating or repair procedures as a result of a failure, then you must, within 30 days of such changes, report the design change or modified procedures in writing to BSEE through the Chief, Office of Offshore Regulatory Programs, unless BSEE has designated a third party as provided in paragraph (d) of this section.

(d) BSEE may designate a third party to receive the data required by paragraphs (a) through (c) of this section on behalf of BSEE. If BSEE designates a third party, you must submit the information required in this section to the designated third party, as directed by BSEE.

[83 FR 49256, Sept. 28, 2018, as amended at 91 FR 35353, June 10, 2026]

§ 250.804 [Reserved]
§ 250.805 Hydrogen sulfide.

(a) In zones known to contain hydrogen sulfide (H2S) or in zones where the presence of H2S is unknown, as defined in § 250.490, you must conduct production operations in accordance with that section and other relevant requirements of this subpart.

(b) You must receive approval through the DWOP process (§§ 250.286 through 250.295) for production operations in HPHT environments known to contain H2S or in HPHT environments where the presence of H2S is unknown.

§§ 250.806-250.809 [Reserved]
Surface and Subsurface Safety Systems Dry Trees
§ 250.810 Dry tree subsurface safety devices—general.

For wells using dry trees or for which you intend to install dry trees, you must equip all tubing installations open to hydrocarbon-bearing zones with subsurface safety devices that will shut off the flow from the well in the event of an emergency unless, after you submit a request containing a justification, the District Manager determines the well to be incapable of natural flow. You must install flow couplings above and below the subsurface safety devices. These subsurface safety devices include the following devices and any associated safety valve lock and landing nipple:

(a) An SSSV, including either:

(1) A surface-controlled SSSV; or

(2) A subsurface-controlled SSSV.

(b) An injection valve.

(c) A tubing plug.

(d) A tubing/annular subsurface safety device.

§ 250.811 Specifications for SSSVs—dry trees.

All surface-controlled and subsurface-controlled SSSVs, safety valve locks, and landing nipples installed in the OCS must conform to the requirements specified in §§ 250.801 through 250.803.

§ 250.812 Surface-controlled SSSVs—dry trees.

You must equip all tubing installations open to a hydrocarbon-bearing zone that is capable of natural flow with a surface-controlled SSSV, except as specified in §§ 250.813, 250.815, and 250.816.

(a) The surface controls must be located on the site or at a BSEE-approved remote location. You may request District Manager approval to situate the surface controls at a remote location.

(b) You must equip dry tree wells not previously equipped with a surface-controlled SSSV, and dry tree wells in which a surface-controlled SSSV has been replaced with a subsurface-controlled SSSV, with a surface-controlled SSSV when the tubing is first removed and reinstalled.

§ 250.813 Subsurface-controlled SSSVs.

You may submit an APM or a request to the District Manager for approval to equip a dry tree well with a subsurface-controlled SSSV in lieu of a surface-controlled SSSV, if the subsurface-controlled SSSV is installed in a well equipped with a surface-controlled SSSV that has become inoperable and cannot be repaired without removal and reinstallation of the tubing. If you remove and reinstall the tubing, you must equip the well with a surface-controlled SSSV.

§ 250.814 Design, installation, and operation of SSSVs—dry trees.

You must design, install, and operate (including repair, maintain, and test) an SSSV to ensure its reliable operation.

(a) You must install the SSSV at a depth at least 100 feet below the mudline within 2 days after production is established. When warranted by conditions such as permafrost, unstable bottom conditions, hydrate formation, or paraffin problems, the District Manager may approve an alternate setting depth on a case-by-case basis.

(b) The well must not be open to flow while the SSSV is inoperable, except when flowing the well is necessary for a particular operation such as cutting paraffin or performing other routine operations as defined in § 250.601.

(c) Until the SSSV is installed, the well must be attended in the immediate vicinity so that any necessary emergency actions can be taken while the well is open to flow. During testing and inspection procedures, the well must not be left unattended while open to production unless you have installed a properly operating SSSV in the well.

(d) You must design, install, maintain, inspect, repair, and test all SSSVs in accordance with ANSI/API Recommended Practice 14B (incorporated by reference, see § 250.198). For additional SSSV testing requirements, refer to § 250.880.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49257, Sept. 28, 2018; 91 FR 35353, June 10, 2026]

§ 250.815 Subsurface safety devices in shut-in wells—dry trees.

(a) You must equip all new dry tree completions (perforated but not placed on production) and completions that are shut-in for a period of 6 months with one of the following:

(1) A pump-through-type tubing plug;

(2) A surface-controlled SSSV, provided the surface control has been rendered inoperative; or

(3) An injection valve capable of preventing backflow.

(b) When warranted by conditions such as permafrost, unstable bottom conditions, hydrate formation, and paraffin problems, the District Manager must approve the setting depth of the subsurface safety device for a shut-in well on a case-by-case basis.

§ 250.816 Subsurface safety devices in injection wells—dry trees.

You must install a surface-controlled SSSV or an injection valve capable of preventing backflow in all injection wells. This requirement is not applicable if the District Manager determines that the well is incapable of natural flow. You must verify the no-flow condition of the well annually.

§ 250.817 Temporary removal of subsurface safety devices for routine operations.

(a) You may remove a wireline- or pumpdown-retrievable subsurface safety device without further authorization or notice, for a routine operation that does not require BSEE approval of a Form BSEE-0124, Application for Permit to Modify (APM). For a list of these routine operations, see § 250.601. The removal period must not exceed 15 days.

(b) Prior to removal, you must identify the well by placing a sign on the wellhead stating that the subsurface safety device was removed. You must note the removal of the subsurface safety device in the records required by § 250.890. If the master valve is open, you must ensure that a trained person (see § 250.891) is in the immediate vicinity to attend the well and take any necessary emergency actions.

(c) You must monitor a platform well when a subsurface safety device has been removed, but a person does not need to remain in the well-bay area continuously if the master valve is closed. If the well is on a satellite structure, it must be attended by a support vessel, or a pump-through plug must be installed in the tubing at least 100 feet below the mudline and the master valve must be closed, unless otherwise approved by the appropriate District Manager.

(d) You must not allow the well to flow while the subsurface safety device is removed, except when it is necessary for the particular operation for which the SSSV is removed. The provisions of this paragraph are not applicable to the testing and inspection procedures specified in § 250.880.

§ 250.818 Additional safety equipment—dry trees.

(a) You must equip all tubing installations that have a wireline- or pumpdown-retrievable subsurface safety device with a landing nipple, with flow couplings or other protective equipment above and below it to provide for the setting of the device.

(b) The control system for all surface-controlled SSSVs must be an integral part of the platform emergency shutdown system (ESD).

(c) In addition to the activation of the ESD by manual action on the platform, the system may be activated by a signal from a remote location. Surface-controlled SSSVs must close in response to shut-in signals from the ESD and in response to the fire loop or other fire detection devices.

§ 250.819 Specification for surface safety valves (SSVs).

All wellhead SSVs and their actuators must conform to the requirements specified in §§ 250.801 through 250.803.

§ 250.820 Use of SSVs.

You must install, maintain, inspect, repair, and test all SSVs in accordance with API Standard 6AV2 (incorporated by reference, see § 250.198). If any SSV does not operate properly, or if any gas and/or liquid fluid flow is observed during the leakage test as described in § 250.880, then you must shut-in all sources to the SSV and repair or replace the valve before resuming production.

[83 FR 49257, Sept. 28, 2018, as amended at 91 FR 35353, June 10, 2026]

§ 250.821 Emergency action and safety system shutdown—dry trees.

(a) If your facility is impacted or will potentially be impacted by an emergency situation (e.g., an impending National Weather Service-named tropical storm or hurricane, ice events, or post-earthquake), you must:

(1) Properly install a subsurface safety device on any well that is not yet equipped with a subsurface safety device and that is capable of natural flow, as soon as possible, with due consideration being given to personnel safety.

(2) You must shut-in (by closing the SSV and the surface-controlled SSSV) the following types of wells:

(i) All oil wells, and

(ii) All gas wells requiring compression.

(b) Closure of the SSV must not exceed 45 seconds after automatic detection of an abnormal condition or actuation of an ESD. The surface-controlled SSSV must close within 2 minutes after the shut-in signal has closed the SSV. The District Manager must approve any alternative design-delayed closure time of greater than 2 minutes based on the mechanical/production characteristics of the individual well.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49257, Sept. 28, 2018]

§§ 250.822-250.824 [Reserved]
Subsea and Subsurface Safety Systems Subsea Trees
§ 250.825 Subsea tree subsurface safety devices—general.

(a) For wells using subsea (wet) trees or for which you intend to install subsea trees, you must equip all tubing installations open to hydrocarbon-bearing zones with subsurface safety devices that will shut off the flow from the well in the event of an emergency. You must also install flow couplings above and below the subsurface safety devices. For instances where the well at issue is incapable of natural flow, you may seek District Manager approval for using alternative procedures or equipment, if you propose to use a subsea safety system that is not capable of shutting off the flow from the well in the event of an emergency. Subsurface safety devices include the following and any associated safety valve lock and landing nipple:

(1) A surface-controlled SSSV;

(2) An injection valve;

(3) A tubing plug; and

(4) A tubing/annular subsurface safety device.

(b) After installing the subsea tree, but before the rig or installation vessel leaves the area, you must test all valves and sensors to ensure that they are operating as designed and meet all the conditions specified in this subpart.

§ 250.826 Specifications for SSSVs—subsea trees.

All SSSVs, safety valve locks, and landing nipples installed on the OCS must conform to the requirements specified in §§ 250.801 through 250.803 and any Deepwater Operations Plan (DWOP) required by §§ 250.286 through 250.295.

§ 250.827 Surface-controlled SSSVs—subsea trees.

You must equip all tubing installations open to a hydrocarbon-bearing zone that is capable of natural flow with a surface-controlled SSSV, except as specified in §§ 250.829 and 250.830. The surface controls must be located on the host facility.

§ 250.828 Design, installation, and operation of SSSVs—subsea trees.

You must design, install, and operate (including repair, maintain, and test) an SSSV to ensure its reliable operation.

(a) You must install the SSSV at a depth at least 100 feet below the mudline. When warranted by conditions, such as unstable bottom conditions, permafrost, hydrate formation, or paraffin problems, the District Manager may approve an alternate setting depth on a case-by-case basis.

(b) The well must not be open to flow while an SSSV is inoperable, unless specifically approved by the District Manager in an APM.

(c) You must design, install, maintain, inspect, repair, and test all SSSVs in accordance with your Deepwater Operations Plan (DWOP) and ANSI/API Recommended Practice 14B (incorporated by reference, see § 250.198). For additional SSSV testing requirements, refer to § 250.880.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49257, Sept. 28, 2018; 91 FR 35353, June 10, 2026]

§ 250.829 Subsurface safety devices in shut-in wells—subsea trees.

(a) You must equip all new subsea tree completions (perforated but not placed on production) and completions shut-in for a period of 6 months with one of the following:

(1) A pump-through-type tubing plug;

(2) An injection valve capable of preventing backflow; or

(3) A surface-controlled SSSV, provided the surface control has been rendered inoperative. For purposes of this section, a surface-controlled SSSV is considered inoperative if, for a direct hydraulic control system, you have bled the hydraulics from the control line and have isolated it from the hydraulic control pressure. If your controls employ an electro-hydraulic control umbilical and the hydraulic control pressure to the individual well cannot be isolated, a surface-controlled SSSV is considered inoperative if you perform the following:

(i) Disable the control function of the surface-controlled SSSV within the logic of the programmable logic controller which controls the subsea well;

(ii) Place a pressure alarm high on the control line to the surface-controlled SSSV of the subsea well; and

(iii) Close the USV and at least one other tree valve on the subsea well.

(b) When warranted by conditions, such as unstable bottom conditions, permafrost, hydrate formation, and paraffin problems, the District Manager must approve the setting depth of the subsurface safety device for a shut-in well on a case-by-case basis.

§ 250.830 Subsurface safety devices in injection wells—subsea trees.

You must install a surface-controlled SSSV or an injection valve capable of preventing backflow in all injection wells. This requirement is not applicable if the District Manager determines that the well is incapable of natural flow. You must verify the no-flow condition of the well annually.

§ 250.831 Alteration or disconnection of subsea pipeline or umbilical.

If a necessary alteration or disconnection of the pipeline or umbilical of any subsea well would affect your ability to monitor casing pressure or to test any subsea valves or equipment, you must contact the appropriate District Office at least 48 hours in advance and submit a repair or replacement plan to conduct the required monitoring and testing. You must not alter or disconnect until the repair or replacement plan is approved.

§ 250.832 Additional safety equipment—subsea trees.

(a) You must equip all tubing installations that have a wireline- or pump down-retrievable subsurface safety device installed after May 31, 1988, with a landing nipple, with flow couplings, or other protective equipment above and below it to provide for the setting of the device.

(b) The control system for all surface-controlled SSSVs must be an integral part of the platform ESD.

(c) In addition to the activation of the ESD by manual action on the platform, the system may be activated by a signal from a remote location.

§ 250.833 Specification for underwater safety valves (USVs).

All USVs, including those designated as primary or secondary, and any alternate isolation valve (AIV) that acts as a USV, if applicable, and their actuators, must conform to the requirements specified in §§ 250.801 through 250.803. A production master or wing valve may qualify as a USV under API Specification 6A and API Standard 6AV1 (both incorporated by reference, see § 250.198).

(a) Primary USV (USV1). You must install and designate one USV on a subsea tree as the USV1. The USV1 must be located upstream of the choke valve. As provided in paragraph (b) of this section, you must inform BSEE if the primary USV designation changes.

(b) Secondary USV (USV2). You may equip your tree with two or more valves qualified to be designated as a USV, one of which may be designated as the USV2. If the USV1 fails to operate properly or exhibits a leakage rate greater than allowed in § 250.880, you must notify the appropriate District Office and designate the USV2 or another qualified valve (e.g., an AIV) that meets all the requirements of this subpart for USVs as the USV1. The USV2 must be located upstream of the choke.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49257, Sept. 28, 2018; 91 FR 35353, June 10, 2026]

§ 250.834 Use of USVs.

You must install, maintain, inspect, repair, and test any valve designated as the primary USV in accordance with this subpart, your DWOP (as specified in §§ 250.286 through 250.295), and API Standard 6AV2 (incorporated by reference, see § 250.198). For additional USV testing requirements, refer to § 250.880.

[83 FR 49257, Sept. 28, 2018, as amended at 91 FR 35353, June 10, 2026]

§ 250.835 Specification for all boarding shutdown valves (BSDVs) associated with subsea systems.

You must install a BSDV on the pipeline boarding riser. All new BSDVs and any BSDVs removed from service for remanufacturing or repair and their actuators installed on the OCS must meet the requirements specified in §§ 250.801 through 250.803. In addition, you must:

(a) Ensure that the internal design pressure(s) of the pipeline(s), riser(s), and BSDV(s) is fully rated for the maximum pressure of any input source and complies with the design requirements set forth in subpart J, unless BSEE approves an alternate design.

(b) Use a BSDV that is fire rated for 30 minutes, and is pressure rated for the maximum allowable operating pressure (MAOP) approved in your pipeline application.

(c) Locate the BSDV within 10 feet of the first point of access to the boarding pipeline riser (i.e., within 10 feet of the edge of platform if the BSDV is horizontal, or within 10 feet above the first accessible working deck, excluding the boat landing and above the splash zone, if the BSDV is vertical).

(d) Install a temperature safety element (TSE) and locate it within 5 feet of each BSDV.

§ 250.836 Use of BSDVs.

You must install, inspect, maintain, repair, and test all new BSDVs, as well as all BSDVs that you remove from service for remanufacturing or repair, in accordance with API Standard 6AV2 (incorporated by reference, see § 250.198) for SSVs. If any BSDV does not operate properly or if any gas fluid and/or liquid fluid flow is observed during the leakage test, as described in § 250.880, you must shut-in all sources to the BSDV and immediately repair or replace the valve.

[83 FR 49257, Sept. 28, 2018, as amended at 91 FR 35353, June 10, 2026]

§ 250.837 Emergency action and safety system shutdown—subsea trees.

(a) If your facility is impacted or will potentially be impacted by an emergency situation (e.g., an impending National Weather Service-named tropical storm or hurricane, ice events, or post-earthquake), you must shut-in all subsea wells unless otherwise approved by the District Manager. A shut-in is defined as a closed BSDV, USV, GLSDV, and surface-controlled SSSV.

(b) When operating a mobile offshore drilling unit (MODU) or other type of workover or intervention vessel in an area with subsea infrastructure, you must:

(1) Suspend production from all wells that could be affected by a dropped object, including upstream wells that flow through the same pipeline; or

(2) Establish direct, real-time communications between the MODU or other type of workover or intervention vessel and the production facility control room and develop a dropped objects plan, as required in § 250.714. If an object is dropped, you must immediately secure the well directly under the MODU or other type of workover or intervention vessel while simultaneously communicating with the platform to shut-in all affected wells. You must also maintain without disruption, and continuously verify, communication between the production facility and the MODU or other type of workover or intervention vessel. If communication is lost between the MODU or other type of workover or intervention vessel and the platform for 20 or more minutes, you must shut-in all wells that could be affected by a dropped object.

(c) In the event of an emergency, you must operate your production system according to the valve closure times in the applicable tables in §§ 250.838 and 250.839 for the following conditions:

(1) Process upset. In the event an upset in the production process train occurs downstream of the BSDV, you must close the BSDV in accordance with the applicable tables in §§ 250.838 and 250.839. You may reopen the BSDV to blow down the pipeline to prevent hydrates, provided you have secured the well(s) and ensured adequate protection.

(2) Pipeline pressure safety high and low (PSHL) sensor. In the event that either a high or a low pressure condition is detected by a PSHL sensor located upstream of the BSDV, you must secure the affected well and pipeline, and all wells and pipelines associated with a dual or multi pipeline system, by closing the BSDVs, USVs, and surface-controlled SSSVs in accordance with the applicable tables in §§ 250.838 and 250.839. You must obtain approval from the appropriate District Manager to resume production in the unaffected pipeline(s) of a dual or multi pipeline system. If the PSHL sensor activation was a false alarm, you may return the wells to production without contacting the appropriate District Manager.

(3) ESD/TSE (platform). In the event of an ESD activation that is initiated because of a platform ESD or platform TSE not associated with the BSDV, you must close the BSDV, USV, and surface-controlled SSSV in accordance with the applicable tables in §§ 250.838 and 250.839.

(4) Subsea ESD (platform) or BSDV TSE. In the event of an emergency shutdown activation that is initiated by the host platform due to an abnormal condition subsea, or a TSE associated with the BSDV, you must close the BSDV, USV, and surface-controlled SSSV in accordance with the applicable tables in §§ 250.838 and 250.839.

(5) Subsea ESD (MODU). In the event of an ESD activation that is initiated by a dropped object from a MODU or other type of workover or intervention vessel, you must secure all wells in the proximity of the MODU or other type of workover or intervention vessel by closing the USVs and surface-controlled SSSVs in accordance with the applicable tables in §§ 250.838 and 250.839. You must notify the appropriate District Manager before resuming production.

(d) Following an ESD or fire, you must bleed your low pressure (LP) and high pressure (HP) hydraulic systems in accordance with the applicable tables in §§ 250.838 and 250.839 to ensure that the valves are locked out of service and cannot be reopened inadvertently.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49257, Sept. 28, 2018]

§ 250.838 What are the maximum allowable valve closure times and hydraulic bleeding requirements for an electro-hydraulic control system?

(a) If you have an electro-hydraulic control system, you must:

(1) Design the subsea control system to meet the valve closure times listed in paragraphs (b) and (d) of this section or your approved DWOP; and

(2) Verify the valve closure times upon installation. The District Manager may require you to verify the closure time of the USV(s) through visual authentication by diver or ROV.

(b) You must comply with the maximum allowable valve closure times and hydraulic system bleeding requirements listed in the following table or your approved DWOP as long as communication is maintained with the platform or with the MODU or other type of workover vessel:

Valve Closure Timing, Electro-Hydraulic Control System

If you have the following. . . | Your pipeline BSDV must. . . | Your USV1 must. . . | Your USV2 must. . . | Your alternate isolation valve must. . . | Your surface-controlled SSSV must. . . | Your LP hydraulic system must. . . | Your HP hydraulic system must. . .

(1) Process upset | Close within 45 seconds after sensor activation | [no requirements]. | [no requirements] | [no requirements] | [no requirements].

(2) Pipeline PSHL | Close within 45 seconds after sensor activation | Close one or more valves within 2 minutes and 45 seconds after sensor activation. Close the designated USV1 within 20 minutes after sensor activation. | Close within 60 minutes after sensor activation. If you use a 60-minute manual resettable timer, you may continue to reset the time for closure up to a maximum of 24 hours total | [no requirements] | Initiate unrestricted bleed within 24 hours after sensor activation.

(3) ESD/TSE (Platform) | Close within 45 seconds after ESD or sensor activation | Close within 5 minutes after ESD or sensor activation. If you use a 5-minute resettable timer, you may continue to reset the time for closure up to a maximum of 20 minutes total | Close within 20 minutes after ESD or sensor activation. | Close within 20 minutes after ESD or sensor activation. If you use a 20-minute manual resettable timer, you may continue to reset the time for closure up to a maximum of 60 minutes total | Initiate unrestricted bleed within 60 minutes after ESD or sensor activation. If you use a 60-minute manual resettable timer you must initiate unrestricted bleed within 24 hours | Initiate unrestricted bleed within 60 minutes after ESD or sensor activation. If you use a 60-minute manual resettable timer you must initiate unrestricted bleed within 24 hours.

(4) Subsea ESD (Platform) or BSDV TSE | Close within 45 seconds after ESD or sensor activation | Close one or more valves within 2 minutes and 45 seconds after ESD or sensor activation. Close all tree valves within 10 minutes after ESD or sensor activation. | Close within 10 minutes after ESD or sensor activation | Initiate unrestricted bleed within 60 minutes after ESD or sensor activation | Initiate unrestricted bleed within 60 minutes after ESD or sensor activation.

(5) Subsea ESD (MODU or other type of workover vessel, Dropped object) | [no requirements] | Initiate valve closure immediately. You may allow for closure of the tree valves immediately prior to closure of the surface-controlled SSSV if desired. | Initiate unrestricted bleed immediately | Initiate unrestricted bleed within 10 minutes after ESD activation.

(c) If you have an electro-hydraulic control system and experience a loss of communications (EH Loss of Comms), you must comply with the following:

(1) If you can meet the EH Loss of Comms valve closure timing conditions specified in the table in paragraph (d) of this section, you must notify the appropriate District Office within 12 hours of detecting the loss of communication.

(2) If you cannot meet the EH Loss of Comms valve closure timing conditions specified in the table in paragraph (d) of this section, you must notify the appropriate District Office immediately after detecting the loss of communication. You must shut-in production by initiating a bleed of the low pressure (LP) hydraulic system or the high pressure (HP) hydraulic system within 120 minutes after loss of communication. You must bleed the other hydraulic system within 180 minutes after loss of communication.

(3) You must obtain approval from the appropriate District Manager before continuing to produce after loss of communication when you cannot meet the EH Loss of Comms valve closure times specified in the table in paragraph (d) of this section. In your request, include an alternate valve closure timing table that your system is able to achieve. The appropriate District Manager may also approve an alternate hydraulic bleed schedule to allow for hydrate mitigation and orderly shut-in.

(d) If you experience a loss of communications, you must comply with the maximum allowable valve closure times and hydraulic system bleeding requirements listed in the following table or your approved DWOP:

Valve Closure Timing, Electro-Hydraulic Control System With Loss of Communication

If you have the following. . . | Your pipeline BSDV must. . . | Your USV1 must. . . | Your USV2 must. . . | Your alternate isolation valve must. . . | Your surface-controlled SSSV must. . . | Your LP hydraulic system must. . . | Your HP hydraulic system must. . .

(1) Process upset | Close within 45 seconds after sensor activation | [no requirements]. | [no requirements] | [no requirements] | [no requirements].

(2) Pipeline PSHL | Close within 45 seconds after sensor activation | Initiate closure when LP hydraulic system is bled (close valves within 5 minutes after sensor activation). | Initiate closure when HP hydraulic system is bled (close within 24 hours after sensor activation) | Initiate unrestricted bleed immediately, concurrent with sensor activation | Initiate unrestricted bleed within 24 hours after sensor activation.

(3) ESD/TSE (Platform) | Close within 45 seconds after ESD or sensor activation | Initiate closure when LP hydraulic system is bled (close valves within 20 minutes after ESD or sensor activation). | Initiate closure when HP hydraulic system is bled (close within 60 minutes after ESD or sensor activation) | Initiate unrestricted bleed concurrent with BSDV closure (bleed within 20 minutes after ESD or sensor activation) | Initiate unrestricted bleed within 60 minutes after ESD or sensor activation.

(4) Subsea ESD (Platform) or BSDV TSE | Close within 45 seconds after ESD or sensor activation | Initiate closure when LP hydraulic system is bled (close valves within 5 minutes after ESD or sensor activation). | Initiate closure when HP hydraulic system is bled (close within 20 minutes after ESD or sensor activation) | Initiate unrestricted bleed immediately | Initiate unrestricted bleed immediately, allowing for surface-controlled SSSV closure.

(5) Subsea ESD (MODU or other type of workover vessel), Dropped object | [no requirements] | Initiate closure immediately. You may allow for closure of the tree valves immediately prior to closure of the surface-controlled SSSV if desired. | Initiate unrestricted bleed immediately | Initiate unrestricted bleed immediately.

§ 250.839 What are the maximum allowable valve closure times and hydraulic bleeding requirements for a direct-hydraulic control system?

(a) If you have a direct-hydraulic control system, you must:

(1) Design the subsea control system to meet the valve closure times listed in this section or your approved DWOP; and

(2) Verify the valve closure times upon installation. The District Manager may require you to verify the closure time of the USV(s) through visual authentication by diver or ROV.

(b) You must comply with the maximum allowable valve closure times and hydraulic system bleeding requirements listed in the following table or your approved DWOP:

Valve Closure Timing, Direct-Hydraulic Control System

If you have the following. . . | Your pipeline BSDV must. . . | Your USV1 must. . . | Your USV2 must. . . | Your alternate isolation valve must. . . | Your surface-controlled SSSV must. . . | Your LP hydraulic system must. . . | Your HP hydraulic system must. . .

(1) Process upset | Close within 45 seconds after sensor activation | [no requirements]. | [no requirements] | [no requirements] | [no requirements].

(2) Flowline PSHL | Close within 45 seconds after sensor activation | Close one or more valves within 2 minutes and 45 seconds after sensor activation. Close the designated USV1 within 20 minutes after sensor activation. | Close within 24 hours after sensor activation | Complete bleed of USV1, USV2, and the AIV within 20 minutes after sensor activation | Complete bleed within 24 hours after sensor activation.

(3) ESD/TSE (Platform) | Close within 45 seconds after ESD or sensor activation | Close all valves within 20 minutes after ESD or sensor activation. | Close within 60 minutes after ESD or sensor activation | Complete bleed of USV1, USV2, and the AIV within 20 minutes after ESD or sensor activation | Complete bleed within 60 minutes after ESD or sensor activation.

(4) Subsea ESD (Platform) or BSDV TSE | Close within 45 seconds after ESD or sensor activation | Close one or more valves within 2 minutes and 45 seconds after ESD or sensor activation. Close all tree valves within 10 minutes after ESD or sensor activation. | Close within 10 minutes after ESD or sensor activation | Complete bleed of USV1, USV2, and the AIV within 10 minutes after ESD or sensor activation | Complete bleed within 10 minutes after ESD or sensor activation.

(5) Subsea ESD (MODU or other type of workover vessel), Dropped object | [no requirements] | Initiate closure immediately. If desired, you may allow for closure of the tree valves immediately prior to closure of the surface-controlled SSSV. | Initiate unrestricted bleed immediately | Initiate unrestricted bleed immediately.

107 PRODUCTION SAFETY SYSTEMS
§ 250.840 Design, installation, and maintenance—general.

You must design, install, and maintain all production facilities and equipment including, but not limited to, separators, treaters, pumps, heat exchangers, fired components, wellhead injection lines, compressors, headers, and flowlines in a manner that is efficient, safe, and protects the environment.

§ 250.841 Platforms.

(a) You must protect all platform production facilities with a basic and ancillary surface safety system designed, analyzed, installed, tested, and maintained in operating condition in accordance with the provisions of Recommended Practice 14C (incorporated by reference, see § 250.198). If you use processing components other than those for which Safety Analysis Checklists are included in Recommended Practice 14C, you must utilize the analysis technique and documentation specified in Recommended Practice 14C to determine the effects and requirements of these components on the safety system. Safety device requirements for pipelines are contained in § 250.1004.

(b) You must design, install, inspect, repair, test, and maintain in operating condition all platform production process piping in accordance with Recommended Practice 14E and API 570 (both incorporated by reference, see § 250.198). The District Manager may approve temporary repairs to facility piping on a case-by-case basis for a period not to exceed 30 days.

(c) If you plan to make a modification to any production safety system that also involves a major modification to the platform structure, you must follow the requirements in § 250.900(b)(2). A major modification to a platform structure is defined in § 250.900(b)(2).

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49257, Sept. 28, 2018; 91 FR 35353, June 10, 2026]

§ 250.842 Approval of safety systems design and installation features.

(a) Before you install or modify a production safety system, you must submit a production safety system application to the District Manager. The District Manager must approve your production safety system application before you commence production through or otherwise use the new or modified system. The application must include the design documentation prescribed as follows:

You must submit: | Details and/or additional requirements:

(1) Safety analysis flow diagram (API Recommended Practice 14C, Annex B) and Safety Analysis Function Evaluation (SAFE) chart (API Recommended Practice 14C, section 6.3.3) (incorporated by reference, see § 250.198); | Your safety analysis flow diagram must show the following: (i) Well shut-in tubing pressure; (ii) Pressure relieving device set points; (iii) Size, capacity, and design working pressures of separators, flare scrubbers, heat exchangers, treaters, storage tanks, compressors, and metering devices; (iv) Size, capacity, design working pressures, and maximum discharge pressure of hydrocarbon-handling pumps; (v) Size, capacity, and design working pressures of hydrocarbon-handling vessels, and chemical injection systems handling a material having a flash point below 100 degrees Fahrenheit for a Class I flammable liquid as described in API Recommended Practice 500 and API Recommended Practice 505 (both incorporated by reference, see § 250.198); and (vi) Piping sizes and maximum allowable working pressures as determined in accordance with API Recommended Practice 14E (incorporated by reference, see § 250.198), including the locations of piping specification breaks.

(2) Electrical one-line diagram; | Showing elements including generators, circuit breakers, transformers, bus bars, conductors, automatic transfer switches, uninterruptable power supply (UPS) and associated battery banks, dynamic (motor) loads, and static loads (e.g., electrostatic treater grid, lighting panels). You must also include a functional legend.

(3) Area classification diagram; | A plan for each platform deck and outlining all classified areas. You must classify areas according to API Recommended Practice 500 or API Recommended Practice 505 (both incorporated by reference, see § 250.198). The plan must contain: (i) All major production equipment, wells, and other significant hydrocarbon and class 1 flammable sources, and a description of the type of decking, ceiling, walls (e.g., grating or solid), and firewalls; and (ii) The location of generators and any buildings (e.g., control rooms and motor control center (MCC) buildings) or major structures on the platform.

(4) A piping and instrumentation diagram, for new facilities; | A detailed flow diagram which shows the piping and vessels in the process flow, together with the instrumentation and control devices.

(5) The service fee listed in § 250.125; | The fee you must pay will be determined by the number of components involved in the review and approval process.

(b) You must develop and maintain the following design documents and make them available to BSEE upon request:

Diagram: | Details and/or additional requirements:

(1) Additional electrical system information; | (i) Cable tray/conduit routing plan that identifies the primary wiring method (e.g., type cable, cable schedule, conduit, wire); and

(ii) Panel board/junction box location plan, if this information is not shown on the area classification diagram required in paragraph (a)(3) of this section.

(2) Schematics of the fire and gas-detection systems; | Showing a functional block diagram of the detection system, including the electrical power supply and also including the type, location, and number of detection sensors; the type and kind of alarms, including emergency equipment to be activated; and the method used for detection.

(3) Revised piping and instrumentation diagram for existing facilities; | A detailed flow diagram which shows the piping and vessels in the process flow, together with the instrumentation and control devices.

(c) In the production safety system application, you must also certify the following:

(1) That all electrical systems were designed according to Recommended Practice 14F or Recommended Practice 14FZ, as applicable (incorporated by reference, see § 250.198);

(2) That the design documents for the mechanical and electrical systems that you are required to submit under paragraph (a) of this section are sealed by a licensed professional engineer. For modified systems, only the modifications are required to be sealed by a licensed professional engineer(s). The professional engineer must be licensed in a State or Territory of the United States and have sufficient expertise and experience to perform the duties; and

(3) That a hazards analysis was performed in accordance with § 250.1911 and Recommended Practice 14J (incorporated by reference, see § 250.198), and that you have a hazards analysis program in place to assess potential hazards during the operation of the facility.

(d) Within 90 days after placing new or modified production safety systems in service, you must submit to the District Manager the as-built diagrams for the new or modified production safety systems outlined in paragraphs (a)(1), (2), and (3) of this section. You must certify in an accompanying letter that the as-built design documents have been reviewed for compliance with applicable regulations and accurately represent the new or modified system as installed. The drawings must be clearly marked “as-built.”

(e) You must maintain approved and supporting design documents required under paragraphs (a) and (b) of this section at your offshore field office nearest the OCS facility or at other locations conveniently available to the District Manager. These documents must be made available to BSEE upon request and must be retained for the life of the facility. All approved designs are subject to field verifications.

[84 FR 24705, May 29, 2019, as amended at 91 FR 35353, June 10, 2026]

§§ 250.843-250.849 [Reserved]
108 Additional Production System Requirements
§ 250.850 Production system requirements—general.

You must comply with the production safety system requirements in §§ 250.851 through 250.872, in addition to the practices contained in API Recommended Practice 14C (incorporated by reference, see § 250.198).

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35354, June 10, 2026]

§ 250.851 Pressure vessels (including heat exchangers) and fired vessels.

(a) Pressure vessels (including heat exchangers) and fired vessels supporting production operations must meet the requirements in the following table:

Item name | Applicable codes and requirements

(1) Pressure and fired vessels | (i) Must be designed, fabricated, and code stamped according to applicable provisions of sections I, IV, and VIII of the ASME Boiler and Pressure Vessel Code (incorporated by reference, see § 250.198). (ii) Must be repaired, maintained, and inspected in accordance with API 510 (incorporated by reference, see § 250.198).

(2) Existing uncoded pressure and fired vessels that have an operating pressure greater than 15 psig and are not code stamped in accordance with the ASME Boiler and Pressure Vessel Code | Must be justified and approval obtained from the District Manager for their continued use.

(3) Pressure relief valves | (i) Must be designed and installed according to applicable provisions of sections I, IV, and VIII of the ASME Boiler and Pressure Vessel Code (incorporated by reference, see § 250.198). (ii) Must conform to the valve sizing and pressure-relieving requirements specified in these documents, but must be set no higher than the maximum-allowable working pressure of the vessel (except for cases where staggered set pressures are required for configurations using multiple relief valves or redundant valves installed and designated for operator use only). (iii) Vents must be positioned in such a way as to prevent fluid from striking personnel or ignition sources.

(4) Steam generators operating at less than 15 psig | Must be equipped with a level safety low (LSL) sensor which will shut off the fuel supply when the water level drops below the minimum safe level.

(5) Steam generators operating at 15 psig or greater | (i) Must be equipped with a level safety low (LSL) sensor which will shut off the fuel supply when the water level drops below the minimum safe level. (ii) Must be equipped with a water-feeding device that will automatically control the water level except when closed loop systems are used for steam generation.

(b) Operating pressure ranges. You must use pressure recording devices to establish the new operating pressure ranges of pressure vessels at any time that the normalized system pressure changes by 50 psig or 5 percent. Once system pressure has stabilized, pressure recording devices must be utilized to establish the new operating pressure ranges. The pressure recording devices must document the pressure range over time intervals that are no less than 4 hours and no more than 30 days long. You must maintain the pressure recording information you used to determine current operating pressure ranges at your field office nearest the OCS facility or at another location conveniently available to the District Manager for as long as the information is valid.

(c) Pressure shut-in sensors must be set according to the following table (initial set points for pressure sensors must be set utilizing gauge readings and engineering design):

Type of sensor | Settings | Additional requirements

(1) High pressure shut-in sensor, | Must be set no higher than 15 percent or 5 psi (whichever is greater) above the highest operating pressure of the vessel | Must also be set sufficiently below (5 percent or 5 psi, whichever is greater) the relief valve's set pressure to assure that the pressure source is shut-in before the relief valve activates.

(2) Low pressure shut-in sensor, | Must be set no lower than 15 percent or 5 psi (whichever is greater) below the lowest pressure in the operating range | You must receive specific approval from the District Manager for activation limits on pressure vessels that have a pressure safety low (PSL) sensor set less than 5 psi.

[81 FR 61918, Sept. 7, 2016, as amended at 84 FR 24706, May 29, 2019; 91 FR 35354, June 10, 2026]

§ 250.852 Flowlines/Headers.

(a) You must:

(1) Equip flowlines from wells with both PSH and PSL sensors. You must locate these sensors in accordance with section A.1 of APR Recommended Practice 14 C (incorporated by reference, see § 250.198).

(2) Use pressure recording devices to establish the new operating pressure ranges of flowlines at any time when the normalized system pressure changes by 50 psig or 5 percent, whichever is higher. The pressure recording devices must document the pressure range over time intervals that are no less than 4 hours and no more than 30 days long.

(3) Maintain the most recent pressure recording information you used to determine operating pressure ranges at your field office nearest the OCS facility or at another location conveniently available to the District Manager for as long as the information is valid.

(b) Flowline shut-in sensors must meet the requirements in the following table (initial set points for pressure sensors must be set using gauge readings and engineering design):

Type of flowline sensor | Settings

(1) PSH sensor, | Must be set no higher than 15 percent or 5 psi (whichever is greater) above the highest operating pressure of the flowline. In all cases, the PSH must be set sufficiently below the maximum shut-in wellhead pressure or the gas-lift supply pressure to ensure actuation of the SSV. Do not set the PSH sensor above the maximum allowable working pressure of the flowline.

(2) PSL sensor, | Must be set no lower than 15 percent or 5 psi (whichever is greater) below the lowest operating pressure of the flowline in which it is installed.

(c) If a well flows directly to a pipeline before separation, the flowline and valves from the well located upstream of and including the header inlet valve(s) must have a working pressure equal to or greater than the maximum shut-in pressure of the well unless the flowline is protected by one of the following:

(1) A relief valve which vents into the platform flare scrubber or some other location approved by the District Manager. You must design the platform flare scrubber to handle, without liquid-hydrocarbon carryover to the flare, the maximum-anticipated flow of hydrocarbons that may be relieved to the vessel; or

(2) Two SSVs with independent PSH sensors connected to separate relays and sensing points and installed with adequate volume upstream of any block valve to allow sufficient time for the SSVs to close before exceeding the maximum allowable working pressure. Each independent PSH sensor must close both SSVs along with any associated flowline PSL sensor. If the maximum shut-in pressure of a dry tree satellite well(s) is greater than 1 1/2 times the maximum allowable pressure of the pipeline, a pressure safety valve (PSV) of sufficient size and relief capacity to protect against any SSV leakage or fluid hammer effect may be required by the District Manager. The PSV must be installed upstream of the host platform boarding valve and vent into the platform flare scrubber or some other location approved by the District Manager.

(d) If a well flows directly to the pipeline from a header without prior separation, the header, the header inlet valves, and pipeline isolation valve must have a working pressure equal to or greater than the maximum shut-in pressure of the well unless the header is protected by the safety devices as outlined in paragraph (c) of this section.

(e) If you are installing flowlines constructed of unbonded flexible pipe on a floating platform, you must:

(1) Review the manufacturer's Design Methodology Verification Report and the independent verification agent's (IVA) certificate for the design methodology contained in that report to ensure that the manufacturer has complied with the requirements of API Specification 17J (incorporated by reference, see § 250.198);

(2) Determine that the unbonded flexible pipe is suitable for its intended purpose;

(3) Submit to the District Manager the manufacturer's design specifications for the unbonded flexible pipe; and

(4) Submit to the District Manager a statement certifying that the pipe is suitable for its intended use and that the manufacturer has complied with the IVA requirements of API Specification 17J (incorporated by reference, see § 250.198).

(f) Automatic pressure or flow regulating choking devices must not prevent the normal functionality of the process safety system that includes, but is not limited to, the flowline pressure safety devices and the SSV.

(g) You may install a single flow safety valve (FSV) on the platform to protect multiple subsea pipelines or wells that tie into a single pipeline riser provided that you install an FSV for each riser on the platform and test it in accordance with the criteria prescribed in § 250.880(c)(2)(v).

(h) You may install a single PSHL sensor on the platform to protect multiple subsea pipelines that tie into a single pipeline riser provided that you install a PSHL sensor for each riser on the platform and locate it upstream of the BSDV.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49259, Sept. 28, 2018; 91 FR 35355, June 10, 2026]

§ 250.853 Safety sensors.

You must ensure that:

(a) All shutdown devices, valves, and pressure sensors function in a manual reset mode;

(b) Sensors with integral automatic reset are equipped with an appropriate device to override the automatic reset mode;

(c) All pressure sensors are equipped to permit testing with an external pressure source; and

(d) All level sensors are equipped to permit testing through an external bridle on all new vessel installations where possible, depending on the type of vessel for which the level sensor is used.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49259, Sept. 28, 2018]

§ 250.854 Floating production units equipped with turrets and turret-mounted systems.

(a) For floating production units equipped with an auto slew system, you must integrate the auto slew control system with your process safety system allowing for automatic shut-in of the production process, including the sources (subsea wells, subsea pumps, etc.) and releasing of the buoy. Your safety system must immediately initiate a process system shut-in according to §§ 250.838 and 250.839 and release the buoy to prevent hydrocarbon discharge and damage to the subsea infrastructure when the following are encountered:

(1) Your buoy is clamped,

(2) Your auto slew mode is activated, and

(3) You encounter a ship heading/position failure or an exceedance of the rotational tolerances of the clamped buoy.

(b) For floating production units equipped with swivel stack arrangements, you must equip the portion of the swivel stack containing hydrocarbons with a leak detection system. Your leak detection system must be tied into your production process surface safety system allowing for automatic shut-in of the system. Upon seal system failure and detection of a hydrocarbon leak, your surface safety system must immediately initiate a process system shut-in according to §§ 250.838 and 250.839.

§ 250.855 Emergency shutdown (ESD) system.

The ESD system must conform to the requirements of Appendix C, section C1, of API Recommended Practice 14C (incorporated by reference, see § 250.198), and the following:

(a) The manually operated ESD valve(s) must be quick-opening and non-restricted to enable the rapid actuation of the shutdown system. Electronic ESD stations must be wired as de-energize to trip circuits or as supervised circuits. Because of the key role of the ESD system in the platform safety system, all ESD components must be of high quality and corrosion resistant and stations must be uniquely identified. Only ESD stations at the boat landing may utilize a loop of breakable synthetic tubing in lieu of a valve or electric switch. This breakable loop is not required to be physically located on the boat landing, but must be accessible from a vessel adjacent to or attached to the facility.

(b) You must maintain a schematic of the ESD that indicates the control functions of all safety devices for the platforms on the platform, at your field office nearest the OCS facility, or at another location conveniently available to the District Manager, for the life of the facility.

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.856 Engines.

(a) Engine exhaust. You must equip all engine exhausts to comply with the insulation and personnel protection requirements of API Recommended Practice 14C, section 4.2 (incorporated by reference, see § 250.198). You must equip exhaust piping from diesel engines with spark arresters.

(b) Diesel engine air intake. You must equip diesel engine air intakes with a device to shut down the diesel engine in the event of runaway (i.e., overspeed). You must equip diesel engines that are continuously attended with either remotely operated manual or automatic shutdown devices. You must equip diesel engines that are not continuously attended with automatic shutdown devices. The following diesel engines do not require a shutdown device: Engines for fire water pumps; engines on emergency generators; engines that power BOP accumulator systems; engines that power air supply for confined entry personnel; temporary equipment on non-producing platforms; booster engines whose purpose is to start larger engines; and engines that power portable single cylinder rig washers.

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.857 Glycol dehydration units.

(a) You must install a pressure relief system or an adequate vent on the glycol regenerator (reboiler) to prevent over pressurization. The discharge of the relief valve must be vented in a nonhazardous manner.

(b) You must install the FSV on the dry glycol inlet to the glycol contact tower as near as practical to the glycol contact tower.

(c) You must install the shutdown valve (SDV) on the wet glycol outlet from the glycol contact tower as near as practical to the glycol contact tower.

§ 250.858 Gas compressors.

(a) You must equip compressor installations with the following protective equipment as required in API Recommended Practice 14C, sections A.4 and A.8 (incorporated by reference, see § 250.198).

(1) A pressure safety high (PSH) sensor, a pressure safety low (PSL) sensor, a pressure safety valve (PSV), a level safety high (LSH) sensor, and a level safety low (LSL) sensor to protect each interstage and suction scrubber.

(2) A temperature safety high (TSH) sensor in the discharge piping of each compressor cylinder or case discharge.

(3) You must design the PSH and PSL sensors and LSH controls protecting compressor suction and interstage scrubbers to actuate automatic SDVs located in each compressor suction and fuel gas line so that the compressor unit and the associated vessels can be isolated from all input sources. All automatic SDVs installed in compressor suction and fuel gas piping must also be actuated by the shutdown of the prime mover. Unless otherwise approved by the District Manager, gas-well gas affected by the closure of the automatic SDV on the suction side of a compressor must be diverted to the pipeline, diverted to a flare or vent in accordance with §§ 250.1160 or 250.1161, or shut-in at the wellhead.

(4) You must install a blowdown valve on the discharge line of all compressor installations that are 1,000 horsepower (746 kilowatts) or greater.

(b) Once system pressure has stabilized, you must use pressure recording devices to establish the new operating pressure ranges for compressor discharge sensors whenever the normalized system pressure changes by 50 psig or 5 percent, whichever is higher. The pressure recording devices must document the pressure range over time intervals that are no less than 4 hours and no more than 30 days long. You must maintain the most recent pressure recording information that you used to determine operating pressure ranges at your field office nearest the OCS facility or at another location conveniently available to the District Manager.

(c) Pressure shut-in sensors must be set according to the following table (initial set points for pressure sensors must be set utilizing gauge readings and engineering design):

Type of sensor | Settings | Additional requirements

(1) PSH sensor, | Must be set no higher than 15 percent or 5 psi (whichever is greater) above the highest operating pressure of the discharge line and sufficiently below the maximum discharge pressure to ensure actuation of the suction SDV | Must also be set sufficiently below (5 percent or 5 psi, whichever is greater) the set pressure of the PSV to assure that the pressure source is shut-in before the PSV activates.

(2) PSL sensor, | Must be set no lower than 15 percent or 5 psi (whichever is greater) below the lowest operating pressure of the discharge line in which it is installed

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.859 Firefighting systems.

(a) On fixed facilities, to protect all areas where production-handling equipment is located, you must install firefighting systems that meet the requirements of this paragraph. You must install a firewater system consisting of rigid pipe with fire hose stations and/or fixed firewater monitors to protect all areas where production-handling equipment is located. Your firewater system must include installation of a fixed water spray system in enclosed well-bay areas where hydrocarbon vapors may accumulate.

(1) Your firewater system must conform to API Recommended Practice 14G (incorporated by reference, see § 250.198).

(2) Fuel or power for firewater pump drivers must be available for at least 30 minutes of run time during a platform shut-in. If necessary, you must install an alternate fuel or power supply to provide for this pump operating time unless the District Manager has approved an alternate firefighting system. In addition:

(i) As of September 7, 2017, you must have equipped all new firewater pump drivers with automatic starting capabilities upon activation of the ESD, fusible loop, or other fire detection system.

(ii) For electric-driven firewater pump drivers, to provide for a potential loss of primary power, you must install an automatic transfer switch to cross over to an emergency power source in order to maintain at least 30 minutes of run time. The emergency power source must be reliable and have adequate capacity to carry the locked-rotor currents of the fire pump motor and accessory equipment.

(iii) You must route power cables or conduits with wires installed between the fire water pump drivers and the automatic transfer switch away from hazardous-classified locations that can cause flame impingement. Power cables or conduits with wires that connect to the fire water pump drivers must be capable of maintaining circuit integrity for not less than 30 minutes of flame impingement.

(3) You must post, in a prominent place on the facility, a diagram of the firefighting system showing the location of all firefighting equipment.

(4) For operations in subfreezing climates, you must furnish evidence to the District Manager that the firefighting system is suitable for those conditions.

(5) You must obtain approval from the District Manager before installing any firefighting system.

(6) All firefighting equipment located on a facility must be in good working order whether approved as the primary, secondary, or ancillary firefighting system.

(b) On floating facilities, to protect all areas where production-handling equipment is located, you must install a firewater system consisting of rigid pipe with fire hose stations and/or fixed firewater monitors. You must install a fixed water spray system in enclosed well-bay areas where hydrocarbon vapors may accumulate. Your firewater system must conform to the USCG requirements for firefighting systems on floating facilities.

(c) Except as provided in paragraph (c)(1) and (2) of this section, on fixed and floating facilities, if you are required to maintain a firewater system and the system becomes inoperable, you must shut-in your production operations while making the necessary repairs. For fixed facilities only, you may continue your production operations on a temporary basis while you make the necessary repairs, provided that:

(1) You request that the appropriate District Manager approve the use of a chemical firefighting system on a temporary basis (for a period up to 7 days) while you make the necessary repairs;

(2) If you are unable to complete repairs during the approved time period because of circumstances beyond your control, the District Manager may grant multiple extensions to your previously approved request to use a chemical firefighting system for periods up to 7 days each.

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.860 Chemical firefighting system.

For fixed platforms:

(a) On minor unmanned platforms, you may use a U.S. Coast Guard type and size rating “B-II” portable dry chemical unit (with a minimum UL Rating (US) of 60-B:C) or a 30-pound portable dry chemical unit, in lieu of a water system, as long as you ensure that the unit is available on the platform when personnel are on board.

(1) A minor platform is a structure with zero to five completions and no more than one item of production processing equipment.

(2) An unmanned platform is one that is not attended 24 hours a day or one on which personnel are not quartered overnight.

(b) On major platforms and minor manned platforms, you may use a firefighting system using chemicals-only in lieu of a water-based system if the District Manager determines that the use of a chemical system provides equivalent fire-protection control and would not increase the risk to human safety.

(1) A major platform is a structure with either six or more completions or zero to five completions with more than one item of production processing equipment.

(2) A minor platform is a structure with zero to five completions and no more than one item of production processing equipment.

(3) A manned platform is one that is attended 24 hours a day or one on which personnel are quartered overnight.

(c) On major platforms and minor manned platforms, to obtain approval to use a chemical-only fire prevention and control system in lieu of a water system under paragraph (b) of this section, you must submit to the District Manager:

(1) A justification for asserting that the use of a chemical system provides equivalent fire-protection control. The justification must address fire prevention, fire protection, fire control, and firefighting on the platform; and

(2) A risk assessment demonstrating that a chemical-only system would not increase the risk to human safety. You must provide the following and any other important information in your risk assessment:

For the use of a chemical firefighting system on major and minor manned platforms, you must provide the following in your risk assessment . . . | Including . . .

(i) Platform description | (A) The type and quantity of hydrocarbons (i.e., natural gas, oil) that are produced, handled, stored, or processed at the facility.

(B) The capacity of any tanks on the facility that you use to store either liquid hydrocarbons or other flammable liquids.

(C) The total volume of flammable liquids (other than produced hydrocarbons) stored on the facility in containers other than bulk storage tanks. Include flammable liquids stored in paint lockers, storerooms, and drums.

(D) If the facility is manned, provide the maximum number of personnel on board and the anticipated length of their stay.

(E) If the facility is unmanned, provide the number of days per week the facility will be visited, the average length of time spent on the facility per visit, the mode of transportation, and whether or not transportation will be available at the facility while personnel are on board.

(F) A diagram that depicts: quarters location, production equipment location, fire prevention and control equipment location, lifesaving appliances and equipment location, and evacuation plan escape routes from quarters and all manned working spaces to primary evacuation equipment.

(ii) Hazard assessment (facility specific) | (A) Identification of all likely fire initiation scenarios (including those resulting from maintenance and repair activities). For each scenario, discuss its potential severity and identify the ignition and fuel sources.

(B) Estimates of the fire/radiant heat exposure that personnel could be subjected to. Show how you have considered designated muster areas and evacuation routes near fuel sources and have verified proper flare boom sizing for radiant heat exposure.

(iii) Human factors assessment (not facility specific) | (A) Descriptions of the fire-related training your employees and contractors have received. Include details on the length of training, whether the training was hands-on or classroom, the training frequency, and the topics covered during the training.

(B) Descriptions of the training your employees and contractors have received in fire prevention, control of ignition sources, and control of fuel sources when the facility is occupied.

(C) Descriptions of the instructions and procedures you have given to your employees and contractors on the actions they should take if a fire occurs. Include those instructions and procedures specific to evacuation. State how you convey this information to your employees and contractors on the platform.

(iv) Evacuation assessment (facility specific) | (A) A general discussion of your evacuation plan. Identify your muster areas (if applicable), both the primary and secondary evacuation routes, and the means of evacuation for both.

(B) Description of the type, quantity, and location of lifesaving appliances available on the facility. Show how you have ensured that lifesaving appliances are located in the near vicinity of the escape routes.

(C) Description of the types and availability of support vessels, whether the support vessels are equipped with a fire monitor, and the time needed for support vessels to arrive at the facility.

(D) Estimates of the worst case time needed for personnel to evacuate the facility should a fire occur.

(v) Alternative protection assessment | (A) Discussion of the reasons you are proposing to use an alternative fire prevention and control system.

(B) Lists of the specific standards used to design the system, locate the equipment, and operate the equipment/system.

(C) Description of the proposed alternative fire prevention and control system/equipment. Provide details on the type, size, number, and location of the prevention and control equipment.

(D) Description of the testing, inspection, and maintenance program you will use to maintain the fire prevention and control equipment in an operable condition. Provide specifics regarding the type of inspection, the personnel who conduct the inspections, the inspection procedures, and documentation and recordkeeping.

(vi) Conclusion | A summary of your technical evaluation showing that the alternative system provides an equivalent level of personnel protection for the specific hazards located on the facility.

(d) On major or minor platforms, if BSEE has approved your request to use a chemical-only fire suppressant system in lieu of a water system under paragraphs (b) and (c) of this section, and if you make an insignificant change to your platform subsequent to that approval, you must document the change and maintain the documentation for the life of the facility at either the facility or nearest field office for BSEE review and/or inspection. Do not submit this documentation to the District Manager. However, if you make a significant change to your platform (e.g., placing a storage vessel with a capacity of 100 barrels or more on the facility, adding production equipment), or if you plan to man an unmanned platform temporarily, you must submit a new request for approval, including an updated risk assessment if previously required, to the appropriate District Manager. You must maintain, for the life of the facility, the most recent documentation that you submitted to BSEE at the facility or nearest field office.

§ 250.861 Foam firefighting systems.

When you install foam firefighting systems as part of a firefighting system that protects production handling areas, you must:

(a) Annually conduct an inspection of the foam concentrates and their tanks or storage containers for evidence of excessive sludging or deterioration;

(b) Annually send samples of the foam concentrate to the manufacturer or authorized representative for quality condition testing. You must have the sample tested to determine the specific gravity, pH, percentage of water dilution, and solid content. Based on these results, the foam must be certified by an authorized representative of the manufacturer as suitable firefighting foam consistent with the original manufacturer's specifications. The certification document must be readily accessible for field inspection. In lieu of sampling and certification, you may choose to replace the total inventory of foam with suitable new stock;

(c) Ensure that the quantity of concentrate meets design requirements, and that tanks or containers are kept full, with space allowed for expansion.

§ 250.862 Fire and gas-detection systems.

For production processing areas only:

(a) You must install fire (flame, heat, or smoke) sensors in all enclosed classified areas. You must install gas sensors in all inadequately ventilated, enclosed classified areas.

(1) Adequate ventilation is defined as ventilation that is sufficient to prevent accumulation of significant quantities of vapor-air mixture in concentrations over 25 percent of the lower explosive limit. An acceptable method of providing adequate ventilation is one that provides a change of air volume each 5 minutes or 1 cubic foot of air-volume flow per minute per square foot of solid floor area, whichever is greater.

(2) Enclosed areas (e.g., buildings, living quarters, or doghouses) are defined as those areas confined on more than 4 of their 6 possible sides by walls, floors, or ceilings more restrictive to air flow than grating or fixed open louvers and of sufficient size to allow entry of personnel.

(3) A classified area is any area classified Class I, Group D, Division 1 or 2, following the guidelines of API Recommended Practice 500 (incorporated by reference, see § 250.198), or any area classified Class I, Zone 0, Zone 1, or Zone 2, following the guidelines of API Recommended Practice 505 (incorporated by reference, see § 250.198).

(b) All detection systems must be capable of continuous monitoring. Fire-detection systems and portions of combustible gas-detection systems related to the higher gas-concentration levels must be of the manual-reset type. Combustible gas-detection systems related to the lower gas-concentration level may be of the automatic-reset type.

(c) A fuel-gas odorant or an automatic gas-detection and alarm system is required in enclosed, continuously manned areas of the facility which are provided with fuel gas. A gas detection system is not required for living quarters and doghouses that do not contain a gas source and that are not located in a classified area.

(d) The District Manager may require the installation and maintenance of a gas detector or alarm in any potentially hazardous area.

(e) Fire- and gas-detection systems must be an approved type, and designed and installed in accordance with API Recommended Practice 14C, API Recommended Practice 14G, API Recommended Practice 14F, API Recommended Practice 14FZ, API Recommended Practice 500, and API Recommended Practice 505 (all incorporated by reference, see § 250.198), provided that, if compliance with any provision of those standards would be in conflict with applicable regulations of the U.S. Coast Guard, compliance with the U.S. Coast Guard regulations controls.

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.863 Electrical equipment.

You must design, install, and maintain electrical equipment and systems in accordance with the requirements in § 250.114.

§ 250.864 Erosion.

You must have a program of erosion control in effect for wells or fields that have a history of sand production. The erosion-control program may include sand probes, X-ray, ultrasonic, or other satisfactory monitoring methods. You must maintain records for each lease that indicate the wells that have erosion-control programs in effect. You must also maintain the results of the programs for at least 2 years and make them available to BSEE upon request.

§ 250.865 Surface pumps.

(a) You must equip pump installations with the protective equipment required in API Recommended Practice 14C, Appendix A—A.7, Pumps (incorporated by reference, see § 250.198).

(b) You must use pressure recording devices to establish the new operating pressure ranges for pump discharge sensors at any time when the normalized system pressure changes by 50 psig or 5 percent, whichever is higher. Once system pressure has stabilized, pressure recording devices must be utilized to establish the new operating pressure ranges. The pressure recording devices must document the pressure range over time intervals that are no less than 4 hours and no more than 30 days long. You must only maintain the most recent pressure recording information that you used to determine operating pressure ranges at your field office nearest the OCS facility or at another location conveniently available to the District Manager.

(c) Pressure shut-in sensors must be set according to the following table (initial set points for pressure sensors must be set utilizing gauge readings and engineering design):

Type of sensor | Settings | Additional requirements

(1) PSH sensor | Must be no higher than 15 percent or 5 psi (whichever is greater) above the highest operating pressure of the discharge line | Must be set sufficiently below the maximum allowable working pressure of the discharge piping. The PSH must also be set at least 5 percent or 5 psi (whichever is greater) below the set pressure of the PSV to assure that the pressure source is shut-in before the PSV activates.

(2) PSL sensor | Must be set no lower than 15 percent or 5 psi (whichever is greater) below the lowest operating pressure of the discharge line in which it is installed

(d) The PSL must be placed into service when the pump discharge pressure has risen above the PSL sensing point, or within 45 seconds of the pump coming into service, whichever is sooner.

(e) You may exclude the PSH and PSL sensors on small, low-volume pumps such as chemical injection-type pumps. This is acceptable if such a pump is used as a sump pump or transfer pump, has a discharge rating of less than 1/2 gallon per minute (gpm), discharges into piping that is 1 inch or less in diameter, and terminates in piping that is 2 inches or larger in diameter.

(f) You must install a TSE in the immediate vicinity of all pumps in hydrocarbon service or those powered by platform fuel gas.

(g) The pump maximum discharge pressure must be determined using the maximum possible suction pressure and the maximum power output of the driver as appropriate for the pump type and service.

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.866 Personnel safety equipment.

You must maintain all personnel safety equipment located on a facility, whether required or not, in good working condition.

§ 250.867 Temporary quarters and temporary equipment.

(a) You must equip temporary quarters with all safety devices required by API Recommended Practice 14C, Appendix C (incorporated by reference, see § 250.198). The District Manager must approve the safety system/safety devices associated with the temporary quarters prior to installation.

(b) The District Manager may require you to install a temporary firewater system for temporary quarters in production processing areas or other classified areas.

(c) Temporary equipment associated with the production process system, including equipment used for well testing and/or well clean-up, must be approved by the District Manager.

(d) The District Manager must approve temporary generators that would require a change to the electrical one-line diagram in § 250.842(a).

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49259, Sept. 28, 2018; 91 FR 35355, June 10, 2026]

§ 250.868 Non-metallic piping.

On fixed OCS facilities, you may use non-metallic piping (such as that made from polyvinyl chloride, chlorinated polyvinyl chloride, and reinforced fiberglass) only in accordance with the requirements of § 250.841(b).

§ 250.869 General platform operations.

(a) Surface or subsurface safety devices must not be bypassed or blocked out of service unless they are temporarily out of service for startup, maintenance, or testing. You may take only the minimum number of safety devices out of service. Personnel must monitor the bypassed or blocked-out functions until the safety devices are placed back in service. Any surface or subsurface safety device which is temporarily out of service must be flagged. A designated visual indicator must be used to identify the bypassed safety device. You must follow the monitoring procedures as follows:

(1) If you are using a non-computer-based system, meaning your safety system operates primarily with pneumatic supply or non-programmable electrical systems, you must monitor bypassed safety devices by positioning monitoring personnel at either the control panel for the bypassed safety device, or at the bypassed safety device, or at the component that the bypassed safety device would be monitoring when in service. You must also ensure that monitoring personnel are able to view all relevant essential operating conditions until all bypassed safety devices are placed back in service and are able to initiate shut-in action in the event of an abnormal condition.

(2) If you are using a computer-based technology system, meaning a computer-controlled electronic safety system such as supervisory control and data acquisition and remote terminal units, you must monitor bypassed safety devices by maintaining instantaneous communications at all times among remote monitoring personnel and the personnel performing maintenance, testing, or startup. Until all bypassed safety devices are placed back in service, you must also position monitoring personnel at a designated control station that is capable of the following:

(i) Displaying all relevant essential operating conditions that affect the bypassed safety device, well, pipeline, and process component. If electronic display of all relevant essential conditions is not possible, you must have field personnel monitoring the level gauges (sight glass) and pressure gauges in order to know the current operating conditions. You must be in communication with all field personnel monitoring the gauges;

(ii) Controlling the production process equipment and the entire safety system;

(iii) Displaying a visual indicator when safety devices are placed in the bypassed mode; and

(iv) Upon command, overriding the bypassed safety device and initiating shut-in action in the event of an abnormal condition.

(3) You must not bypass for startup any element of the emergency support system or other support system required by API Recommended Practice 14C, Appendix C (incorporated by reference, see § 250.198) without first receiving BSEE approval to depart from this operating procedure. These systems include, but are not limited to:

(i) The ESD system to provide a method to manually initiate platform shutdown by personnel observing abnormal conditions or undesirable events. You do not have to receive approval from the District Manager for manual reset and/or initial charging of the system;

(ii) The fire loop system to sense the heat of a fire and initiate platform shutdown, and other fire detection devices (flame, thermal, and smoke) that are used to enhance fire detection capability. You do not have to receive approval from the District Manager for manual reset and/or initial charging of the system;

(iii) The combustible gas detection system to sense the presence of hydrocarbons and initiate alarms and platform shutdown before gas concentrations reach the lower explosive limit;

(iv) Adequate ventilation;

(v) The containment system to collect escaped liquid hydrocarbons and initiate platform shutdown;

(vi) Subsurface safety valves, including those that are self-actuated (subsurface-controlled SSSVs) or those that are activated by an ESD system and/or a fire loop (surface-controlled SSSV). You do not have to receive approval from the District Manager for routine operations in accordance with § 250.817;

(vii) The pneumatic supply system; and

(viii) The system for discharging gas to the atmosphere.

(4) In instances where components of the ESD, as listed in paragraph (a)(3) of this section, are bypassed for maintenance, precautions must be taken to provide the equivalent level of protection that existed prior to the bypass.

(b) When wells are disconnected from producing facilities and blind flanged, or equipped with a tubing plug, or the master valves have been locked closed, you are not required to comply with the provisions of API Recommended Practice 14C (incorporated by reference, see § 250.198) or this regulation concerning the following:

(1) Automatic fail-close SSVs on wellhead assemblies, and

(2) The PSH and PSL sensors in flowlines from wells.

(c) When pressure or atmospheric vessels are isolated from production facilities (e.g., inlet valve locked closed or inlet blind-flanged) and are to remain isolated for an extended period of time, safety device testing in accordance with API Recommended Practice 14C (incorporated by reference, see § 250.198), or this subpart is not required, with the exception of the PSV, unless the vessel is open to the atmosphere.

(d) All open-ended lines connected to producing facilities and wells must be plugged or blind-flanged, except those lines designed to be open-ended such as flare or vent lines.

(e) On all new production safety system installations, component process control devices and component safety devices must not be installed utilizing the same sensing points.

(f) All pneumatic control panels and computer based control stations must be labeled according to API RP 14C nomenclature.

[81 FR 61918, Sept. 7, 2016, as amended at 91 FR 35355, June 10, 2026]

§ 250.870 Time delays on pressure safety low (PSL) sensors.

(a) You may apply industry standard Class B, Class C, or Class B/C logic to applicable PSL sensors installed on process equipment. If the device may be bypassed for greater than 45 seconds, you must monitor the bypassed devices in accordance with § 250.869(a). You must document on your field test records any use of a PSL sensor with a time delay greater than 45 seconds. For purposes of this section, PSL sensors are categorized as follows:

(1) Class B safety devices have logic that allows for the PSL sensors to be bypassed for a fixed time period (typically less than 15 seconds, but not more than 45 seconds). Examples include sensors used in conjunction with the design of pump and compressor panels such as PSL sensors, lubricator no-flows, and high-water jacket temperature shutdowns.

(2) Class C safety devices have logic that allows for the PSL sensors to be bypassed until the component comes into full service (i.e., the time at which the startup pressure equals or exceeds the set pressure of the PSL sensor, the system reaches a stabilized pressure, and the PSL sensor clears). If a Class C safety device is bypassed, you must monitor the device until it is in full service.

(3) Class B/C safety devices have logic that allows for the PSL sensors to incorporate a combination of Class B and Class C circuitry. These devices are used to ensure that the PSL sensors are not unnecessarily bypassed during startup and idle operations, (e.g., Class B/C bypass circuitry activates when a pump is shut down during normal operations). The PSL sensor remains bypassed until the pump's start circuitry is activated and either:

(i) The Class B timer expires no later than 45 seconds from start activation, or

(ii) The Class C bypass is initiated until the pump builds up pressure above the PSL sensor set point and the PSL sensor comes into full service.

(b) If you do not install time delay circuitry that bypasses activation of PSL sensor shutdown logic for a specified time period on process and product transport equipment during startup and idle operations, you must manually bypass (pin out or disengage) the PSL sensor, with a time delay not to exceed 45 seconds.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49259, Sept. 28, 2018]

§ 250.871 Welding and burning practices and procedures.

All welding, burning, and hot-tapping activities must be conducted according to the specific requirements in § 250.113.

§ 250.872 Atmospheric vessels.

(a) You must equip atmospheric vessels used to process and/or store liquid hydrocarbons or other Class I liquids as described in API Recommended Practice 500 or API Recommended Practice 505 (both incorporated by reference, see § 250.198) with protective equipment identified in API Recommended Practice 14C, section A.5 (incorporated by reference, see § 250.198). Transport tanks approved by the U.S. Department of Transportation, that are sealed and not connected via interconnected piping to the production process train and that are used only for storage of refined liquid hydrocarbons or Class I liquids, are not required to be equipped with the protective equipment identified in API Recommended Practice 14C, section A.5. The atmospheric vessels connected to the process system that contains a Class I liquid and the associated pumps must be reflected on the design documents listed in § 250.842(a)(1) through (4) and (b)(3).

(b) You must ensure that all atmospheric vessels are designed and maintained to ensure the proper working conditions for LSH sensors. The LSH sensor bridle must be designed to prevent different density fluids from impacting sensor functionality.

(c) You must ensure that all atmospheric vessels are designed, installed, and maintained to prevent pollution, including the displacement of oil out of an overboard water outlet, as required by § 250.300(b)(3) and (4).

[83 FR 49259, Sept. 28, 2018, as amended at 91 FR 35355, June 10, 2026]

§ 250.873 Subsea gas lift requirements.

If you choose to install a subsea gas lift system, you must design your system as approved in your DWOP or as follows:

(a) Design the gas lift supply pipeline in accordance with API Recommended Practice 14C (incorporated by reference, see § 250.198) for the gas lift supply system located on the platform.

(b) Meet the applicable requirements in the following table:

If your subsea gas lift system introduces the lift gas to the . . . | Then you must install a | In addition, you must

API Specification 6A 1 and API Standard 6AV1 1 gas-lift shutdown valve (GLSDV), and . . . | FSV on the gas-lift supply pipeline . . . | PSHL on the gas-lift supply . . . | API Specification 6A 1 and API Standard 6AV1 1 manual isolation valve . . .

(1) Subsea pipelines, pipeline risers, or manifolds via an external gas lift pipeline or umbilical | (i) Meet all of the requirements for the BSDV described in §§ 250.835 and 250.836 on the gas-lift supply pipeline. Locate the GLSDV within 10 feet of the first point of access to the gas-lift riser or topsides umbilical termination assembly (TUTA) (i.e., within 10 feet of the edge of the platform if the GLSDV is horizontal, or within 10 feet above the first accessible working deck, excluding the boat landing and above the splash zone, if the GLSDV is in the vertical run of a riser, or within 10 feet of the TUTA if using an umbilical) | On the platform upstream (in-board) of the GLSDV | Pipeline on the platform downstream (out board) of the GLSDV | Downstream (out board) of the PSHL and above the waterline. This valve does not have to be actuated | (A) Ensure that the MAOP of a subsea gas lift supply pipeline is equal to the MAOP of the production pipeline. (B) Install an actuated fail-safe close gas-lift isolation valve (GLIV) located at the point of intersection between the gas lift supply pipeline and the production pipeline, pipeline riser, or manifold. (C) Install the GLIV downstream of the underwater safety valve(s) (USV) and/or AIV(s).

(ii) [Reserved]

(2) Subsea well(s) through the casing string via an external gas lift pipeline or umbilical | (i) Meet all of the requirements for the GLSDV described in §§ 250.835 and 250.836 on the gas-lift supply pipeline. Locate the GLSDV within 10 feet of the first point of access to the gas-lift riser or topsides umbilical termination assembly (TUTA) (i.e., within 10 feet of the edge of the platform if the GLSDV is horizontal, or within 10 feet above the first accessible working deck, excluding the boat landing and above the splash zone, if the GLSDV is in the vertical run of a riser, or within 10 feet of the TUTA if using an umbilical) | On the platform upstream (in-board) of the GLSDV | Pipeline on the platform down- stream (out board) of the GLSDV | Downstream (out board) of the PSHL and above the waterline. This valve does not have to be actuated. | (A) Install an actuated, fail-safe-closed GLIV on the gas lift supply pipeline near the wellhead to provide the dual function of containing annular pressure and shutting off the gas lift supply gas. (B) If your subsea tree or tubing head is equipped with an annulus master valve (AMV) or an annulus wing valve (AWV), one of these may be designated as the GLIV. (C) Consider installing the GLIV external to the subsea tree to facilitate repair and or replacement if necessary.

(ii) [Reserved]

(3) Pipeline risers via a gas-lift line contained within the pipeline riser | (i) Meet all of the requirements for the GLSDV described in §§ 250.835(a), (b), and (d) and 250.836 on the gas-lift supply pipeline | Upstream (in-board) of the GLSDV | Flowline upstream (in-board) of the FSV | Downstream (out board) of the GLSDV | (A) Ensure that the gas-lift supply flowline from the gas-lift compressor to the GLSDV is pressure-rated for the MAOP of the pipeline riser. (B) Ensure that any surface equipment associated with the gas-lift system is rated for the MAOP of the pipeline riser. (C) Ensure that the gas-lift compressor discharge pressure never exceeds the MAOP of the pipeline riser. (D) Suspend and seal the gas-lift flowline contained within the production riser in a flanged API Specification 6A component such as an API Specification 6A tubing head and tubing hanger or a component designed, constructed, tested, and installed to the requirements of API Specification 6A. (E) Ensure that all potential leak paths upstream or near the production riser BSDV on the platform provide the same level of safety and environmental protection as the production riser BSDV. (F) Ensure that this complete assembly is fire-rated for 30 minutes.

(ii) Attach the GLSDV by flanged connection directly to the API Specification 6A component used to suspend and seal the gas-lift line contained within the production riser. To facilitate the repair or replacement of the GLSDV or production riser BSDV, you may install a manual isolation valve between the GLSDV and the API Specification 6A component used to suspend and seal the gas-lift line contained within the production riser, or outboard of the production riser BSDV and inboard of the API Specification 6A component used to suspend and seal the gas-lift line contained within the production riser

1 Incorporated by reference, see § 250.198.

(c) Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following:

(1) Electro-hydraulic control system with gas lift,

(2) Electro-hydraulic control system with gas lift with loss of communications,

(3) Direct-hydraulic control system with gas lift.

(d) Follow the gas lift system valve testing requirements according to the following table:

Type of gas lift system | Valve | Allowable leakage rate | Testing frequency

(1) Gas lifting a subsea pipeline, pipeline riser, or manifold via an external gas lift pipeline | GLSDV | Zero leakage | Monthly, not to exceed 6 weeks.

GLIV | N/A | Function tested quarterly, not to exceed 120 days.

(2) Gas lifting a subsea well through the casing string via an external gas lift pipeline | GLSDV | Zero leakage | Monthly, not to exceed 6 weeks.

GLIV | 400 cc per minute of liquid or 15 scf per minute of gas. | Function tested quarterly, not to exceed 120 days

(3) Gas lifting the pipeline riser via a gas lift line contained within the pipeline riser | GLSDV | Zero leakage | Monthly, not to exceed 6 weeks.

[81 FR 61918, Sept. 7, 2016, as amended at 84 FR 24707, May 29, 2019; 91 FR 35355, June 10, 2026]

§ 250.874 Subsea water injection systems.

If you choose to install a subsea water injection system, your system must comply with your approved DWOP, which must meet the following minimum requirements:

(a) Adhere to the water injection requirements described in API Recommended Practice 14C (incorporated by reference as specified in § 250.198) for the water injection equipment located on the platform. In accordance with § 250.830, either a surface-controlled SSSV or a water injection valve (WIV) that is self-activated and not controlled by emergency shut-down (ESD) or sensor activation must be installed in a subsea water injection well.

(b) Equip a water injection pipeline with a surface FSV and water injection shutdown valve (WISDV) on the surface facility.

(c) Install a PSHL sensor upstream (in-board) of the FSV and WISDV.

(d) Use subsea tree(s), wellhead(s), connector(s), and tree valves, and surface-controlled SSSV or WIV associated with a water injection system that are rated for the maximum anticipated injection pressure.

(e) Consider the effects of hydrogen sulfide (H2S) when designing your water flood system, as required by § 250.805.

(f) Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following:

(1) Electro-hydraulic control system with water injection,

(2) Electro-hydraulic control system with water injection with loss of communications, and

(3) Direct-hydraulic control system with water injection.

(g) Comply with the following injection valve testing requirements:

(1) You must test your injection valves as provided in the following table:

Valve | Allowable leakage rate | Testing frequency

(i) WISDV | Zero leakage | Monthly, not to exceed 6 weeks between tests.

(ii) Surface-controlled SSSV or WIV | 400 cc per minute of liquid or 15 scf per minute of gas | Semiannually, not to exceed 6 calendar months between tests.

(2) If a designated USV on a water injection well fails the applicable test under § 250.880(c)(4)(ii), you must notify the appropriate District Manager and request approval to designate another API Specification 6A and API Standard 6AV1 (both incorporated by reference, see § 250.198) certified subsea valve as your USV.

(3) If a USV on a water injection well fails the test and the surface-controlled SSSV or WIV cannot be tested as required under (g)(1)(ii) of this section because of low reservoir pressure, you must submit a request to the appropriate District Manager with an alternative plan that ensures subsea shutdown capabilities.

(h) If you experience a loss of communications during water injection operations, you must comply with the following:

(1) Notify the appropriate District Manager within 12 hours after detecting loss of communication; and

(2) Obtain approval from the appropriate District Manager to continue to inject during the loss of communication.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49262, Sept. 28, 2018; 91 FR 35357, June 10, 2026]

§ 250.875 Subsea pump systems.

If you choose to install a subsea pump system, your system must comply with your approved DWOP, which must meet the following minimum requirements:

(a) Include the installation of an isolation valve at the inlet of your subsea pump module.

(b) Include a PSHL sensor upstream of the BSDV, if the maximum possible discharge pressure of the subsea pump operating in a dead head condition (that is the maximum shut-in tubing pressure at the pump inlet and a closed BSDV) is less than the MAOP of the associated pipeline.

(c) If the maximum possible discharge pressure of the subsea pump operating in a dead head situation could be greater than the MAOP of the pipeline:

(1) Include, at minimum, 2 independent functioning PSHL sensors upstream of the subsea pump and 2 independent functioning PSHL sensors downstream of the pump, that:

(i) Are operational when the subsea pump is in service; and

(ii) Will, when activated, shut down the subsea pump, the subsea inlet isolation valve, and either the designated USV1, the USV2, or the alternate isolation valve.

(iii) If more than 2 PSHL sensors are installed both upstream and downstream of the subsea pump for operational flexibility, then 2 out of 3 voting logic may be implemented in which the subsea pump remains operational provided a minimum of 2 independent PSHL sensors are functional both upstream and downstream of the pump.

(2) Interlock the subsea pump motor with the BSDV to ensure that the pump cannot start or operate when the BSDV is closed, incorporate at a minimum the following permissive signals into the control system for your subsea pump, and ensure that the subsea pump is not able to be started or re-started unless:

(i) The BSDV is open;

(ii) All automated valves downstream of the subsea pump are open;

(iii) The upstream subsea pump isolation valve is open; and

(iv) All parameters associated with the subsea pump operation (e.g., pump temperature high, pump vibration high, pump suction pressure high, pump discharge pressure high, pump suction flow low) must be cleared (i.e., within operational limits) or continuously monitored by personnel who observe visual indicators displayed at a designated control station and have the capability to initiate shut-in action in the event of an abnormal condition.

(3) Monitor the separator for seawater.

(4) Ensure that the subsea pump systems are controlled by an electro-hydraulic control system.

(d) Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following:

(1) Electro-hydraulic control system with a subsea pump;

(2) A loss of communication with the subsea well(s) and not a loss of communication with the subsea pump control system without an ESD or sensor activation;

(3) A loss of communication with the subsea pump control system, and not a loss of communication with the subsea well(s);

(4) A loss of communication with the subsea well(s) and the subsea pump control system.

(e) For subsea pump testing:

(1) Perform a complete subsea pump function test, including full shutdown, after any intervention or changes to the software and equipment affecting the subsea pump; and

(2) Test the subsea pump shutdown, including PSHL sensors both upstream and downstream of the pump, each quarter (not to exceed 120 days between tests). This testing may be performed concurrently with the ESD function test required by § 250.880(c)(4)(v).

§ 250.876 Fired and exhaust heated components.

No later than September 7, 2018, and at least once every 5 years thereafter, you must have qualified third-party inspect, and then you must repair or replace, as needed, the fire tube for tube-type heaters that are equipped with either automatically controlled natural or forced draft burners installed in either atmospheric or pressure vessels that heat hydrocarbons and/or glycol. If inspection indicates tube-type heater deficiencies, you must complete and document repairs or replacements. You must document the inspection results, retain such documentation for at least 5 years, and make the documentation available to BSEE upon request.

[83 FR 49262, Sept. 28, 2018]

§§ 250.877-250.879 [Reserved]
109 Safety Device Testing
§ 250.880 Production safety system testing.

(a) Notification. You must:

(1) Notify the District Manager at least 72 hours before you commence initial production on a facility as required in § 250.800(a)(2), in order for BSEE to conduct the preproduction inspection of the integrated safety system.

(2) Notify the District Manager upon commencement of production so that BSEE may conduct a complete inspection.

(3) Notify the District Manager and receive BSEE approval before you perform any subsea intervention that modifies the existing subsea infrastructure in a way that may affect the casing monitoring capabilities and testing frequencies specified in the table set forth in paragraph (c)(4) of this section.

(b) Testing methodologies. You must:

(1) Test safety valves and other equipment at the intervals specified in the tables set forth in paragraph (c) of this section or more frequently if operating conditions warrant; and

(2) Perform testing and inspections in accordance with API Recommended Practice 14C, Appendix D (incorporated by reference, see § 250.198), and the additional requirements specified in the tables of this section or as approved in the DWOP for your subsea system.

(c) Testing frequencies. You must:

(1) Comply with the following testing requirements for subsurface safety devices on dry tree wells:

Item name | Testing frequency, allowable leakage rates, and other requirements

(i) Surface-controlled SSSVs (including devices installed in shut-in and injection wells) | Semi-annually, not to exceed 6 calendar months between tests. Also test in place when first installed or reinstalled. If the device does not operate properly, or if a liquid leakage rate > 400 cubic centimeters per minute or a gas leakage rate > 15 standard cubic feet per minute is observed, the device must be removed, repaired, and reinstalled or replaced. Testing must be according to ANSI/API Recommended Practice 14B (incorporated by reference, see § 250.198) to ensure proper operation.

(ii) Subsurface-controlled SSSVs | Semi-annually, not to exceed 6 calendar months between tests for valves not installed in a landing nipple and 12 months for valves installed in a landing nipple. The valve must be removed, inspected, and repaired or adjusted, as necessary, and reinstalled or replaced.

(iii) Tubing plug | Semi-annually, not to exceed 6 calendar months between tests. Test by opening the well to possible flow. If a liquid leakage rate > 400 cubic centimeters per minute or a gas leakage rate > 15 standard cubic feet per minute is observed, the plug must be removed, repaired, and reinstalled or replaced. An additional tubing plug may be installed in lieu of removal.

(iv) Injection valves | Semi-annually, not to exceed 6 calendar months between tests. Test by opening the well to possible flow. If a liquid leakage rate > 400 cubic centimeters per minute or a gas leakage rate > 15 standard cubic feet per minute is observed, the valve must be removed, repaired and reinstalled or replaced.

(2) Comply with the following testing requirements for surface valves:

Item name | Testing frequency and requirements

(i) PSVs | Annually, not to exceed 12 calendar months between tests. Valve must either be bench-tested or equipped to permit testing with an external pressure source. Weighted disc vent valves used as PSVs on atmospheric tanks may be disassembled and inspected in lieu of function testing. The main valve piston must be lifted during this test.

(ii) Automatic inlet SDVs that are actuated by a sensor on a vessel or compressor | Once each calendar month, not to exceed 6 weeks between tests.

(iii) SDVs in liquid discharge lines and actuated by vessel low-level sensors | Once each calendar month, not to exceed 6 weeks between tests.

(iv) SSVs | Once each calendar month, not to exceed 6 weeks between tests. Valves must be tested for both operation and leakage. You must test according to API Standard 6AV2 (incorporated by reference, see § 250.198). If an SSV does not operate properly or if any gas and/or liquid fluid flow is observed during the leakage test, the valve must be immediately repaired or replaced.

(v) Flowline FSVs | Once each calendar month, not to exceed 6 weeks between tests. All flowline FSVs must be tested, including those installed on a host facility in lieu of being installed at a satellite well. You must test flowline FSVs for leakage in accordance with the test procedure specified in API Recommended Practice 14C (incorporated by reference, see § 250.198). If leakage measured exceeds a liquid flow of 400 cubic centimeters per minute or a gas flow of 15 standard cubic feet per minute, the FSV must be repaired or replaced.

(3) Comply with the following testing requirements for surface safety systems and devices:

Item name | Testing frequency and requirements

(i) Pumps for firewater systems | Must be inspected and operated according to API Recommended Practice 14G, Section 7.2 (incorporated by reference, see § 250.198).

(ii) Fire- (flame, heat, or smoke) and gas detection systems | Must be tested for operation and recalibrated every 3 months, not to exceed 120 days between tests, provided that testing can be performed in a non-destructive manner. Open flame or devices operating at temperatures that could ignite a methane-air mixture must not be used. All combustible gas-detection systems must be calibrated every 3 months.

(iii) ESD systems | (A) Pneumatic based ESD systems must be tested for operation at least once each calendar month, not to exceed 6 weeks between tests. You must conduct the test by alternating ESD stations monthly to close at least one wellhead SSV and verify a surface-controlled SSSV closure for that well as indicated by control circuitry actuation. All stations must be checked for functionality at least once each calendar month, not to exceed 6 weeks between tests. No station may be reused until all stations have been tested. (B) Electronic based ESD systems must be tested for operation at least once every 3 calendar months, not to exceed 120 days between tests. The test must be conducted by alternating ESD stations to close at least one wellhead SSV and verify a surface-controlled SSSV closure for that well as indicated by control circuitry actuation. All stations must be checked for functionality at least once every 3 calendar months, not to exceed 120 days between checks. No station may be reused until all stations have been tested. (C) Electronic/pneumatic based ESD systems must be tested for operation at least once every 3 calendar months, not to exceed 120 days between tests. The test must be conducted by alternating ESD stations to close at least one wellhead SSV and verify a surface-controlled SSSV closure for that well as indicated by control circuitry actuation. All stations must be checked for functionality at least once every 3 calendar months, not to exceed 120 days between checks. No station may be reused until all stations have been used.

(iv) TSH devices | Must be tested for operation annually, not to exceed 12 calendar months between tests, excluding those addressed in paragraph (c)(3)(v) of this section and those that would be destroyed by testing. Those that could be destroyed by testing must be visually inspected and the circuit tested for operations at least once every 12 months.

(v) TSH shutdown controls installed on compressor installations that can be nondestructively tested | Must be tested every 6 months and repaired or replaced as necessary.

(vi) Burner safety low | Must be tested annually, not to exceed 12 calendar months between tests.

(vii) Flow safety low devices | Must be tested annually, not to exceed 12 calendar months between tests.

(viii) Flame, spark, and detonation arrestors | Must be visually inspected annually, not to exceed 12 calendar months between inspections.

(ix) Electronic pressure transmitters and level sensors: PSH and PSL; LSH and LSL | Must be tested at least once every 3 months, not to exceed 120 days between tests.

(x) Pneumatic/electronic switch PSH and PSL; pneumatic/electronic switch/electric analog with mechanical linkage LSH and LSL controls | Must be tested at least once each calendar month, not to exceed 6 weeks between tests.

(4) Comply with the following testing requirements for subsurface safety devices and associated systems on subsea tree wells:

Item name | Testing frequency, allowable leakage rates, and other requirements

(i) Surface-controlled SSSVs (including devices installed in shut-in and injection wells) | Tested semiannually, not to exceed 6 months between tests. If the device does not operate properly, or if a liquid leakage rate > 400 cubic centimeters per minute or a gas leakage rate > 15 standard cubic feet per minute is observed, the device must be removed, repaired, and reinstalled or replaced. Testing must be according to ANSI/API Recommended Practice 14B (incorporated by reference, see § 250.198) to ensure proper operation, or as approved in your DWOP.

(ii) USVs | Tested at least once every 3 calendar months, not to exceed 120 days between tests. If the device does not function properly, or if a liquid leakage rate > 400 cubic centimeters per minute or a gas leakage rate > 15 standard cubic feet per minute is observed, the valve must be removed, repaired, and reinstalled or replaced.

(iii) BSDVs | Tested at least once each calendar month, not to exceed 6 weeks between tests. Valves must be tested for both operation and leakage. You must test according to API Standard 6AV2 for SSVs (incorporated by reference, see § 250.198). If a BSDV does not operate properly or if any fluid flow is observed during the leakage test, the valve must be immediately repaired or replaced.

(iv) Electronic ESD logic | Tested at least once each calendar month, not to exceed 6 weeks between tests.

(v) Electronic ESD function | Tested at least once every 3 calendar months, not to exceed 120 days between tests. Shut-in at least one well during the ESD function test. If multiple wells are tied back to the same platform, a different well should be shut-in with each quarterly test.

(d) Subsea wells. (1) Any subsea well that is completed and disconnected from monitoring capability may not be disconnected for more than 24 months, unless authorized by BSEE.

(2) Any subsea well that is completed and disconnected from monitoring capability for more than 6 months must meet the following testing and other requirements:

(i) Each well must have 3 pressure barriers:

(A) A closed and tested surface-controlled SSSV,

(B) A closed and tested USV, and

(C) One additional closed and tested tree valve.

(ii) For new completed wells, prior to the rig leaving the well, the pressure barriers must be tested as follows:

(A) The surface-controlled SSSV must be tested for leakage in accordance with § 250.828(c);

(B) The USV and other pressure barrier must be tested to confirm zero leakage rate.

(iii) A sealing pressure cap must be installed on the flowline connection hub until the flowline is installed and connected. The pressure cap must be designed to accommodate monitoring for pressure between the production wing valve and cap. The pressure cap must also be designed so that a remotely operated vehicle can bleed pressure off, monitor for buildup, and confirm barrier integrity.

(iv) Pressure monitoring at the sealing pressure cap on the flowline connection hub must be performed in each well at intervals not to exceed 12 months from the time of initial testing of the pressure barrier (prior to demobilizing the rig from the field).

(v) You must have a drilling vessel capable of intervention into the disconnected well in the field or readily accessible for use until the wells are brought on line.

[81 FR 61918, Sept. 7, 2016, as amended at 83 FR 49262, Sept. 28, 2018; 91 FR 35357, June 10, 2026]

§§ 250.881-250.889 [Reserved]
110 Records and Training
§ 250.890 Records.

(a) You must maintain records that show the present status and history of each safety device. Your records must include dates and details of installation, removal, inspection, testing, repairing, adjustments, and reinstallation.

(b) You must maintain these records for at least 2 years. You must maintain the records at your field office nearest the OCS facility and a secure onshore location. These records must be available for review by a representative of BSEE.

(c) You must submit to the appropriate District Manager a contact list for all OCS facilities at least annually or when contact information is revised. The contact list must include:

(1) Designated operator name;

(2) Designated primary point of contact for the facility;

(3) Facility phone number(s), if applicable;

(4) Facility fax number, if applicable;

(5) Facility radio frequency, if applicable;

(6) Facility helideck rating and size, if applicable; and

(7) Facility records location if not contained on the facility.

§ 250.891 Safety device training.

You must ensure that personnel installing, repairing, testing, maintaining, and operating surface and subsurface safety devices, and personnel operating production platforms (including, but not limited to, separation, dehydration, compression, sweetening, and metering operations), are trained in accordance with the procedures in subpart O and subpart S of this part.

§§ 250.892-250.899 [Reserved]
Subpart I Platforms and Structures
111 General Requirements for Platforms
§ 250.900 What general requirements apply to all platforms?

(a) You must design, fabricate, install, use, maintain, inspect, and assess all platforms and related structures on the Outer Continental Shelf (OCS) so as to ensure their structural integrity for the safe conduct of drilling, workover, and production operations. In doing this, you must consider the specific environmental conditions at the platform location.

(b) You must also submit an application under § 250.905 of this subpart and obtain the approval of the Regional Supervisor before performing any of the activities described in the following table:

Activity requiring application and approval | Conditions for conducting the activity

(1) Install a platform. This includes placing a newly constructed platform at a location or moving an existing platform to a new site | (i) You must adhere to the requirements of this subpart, including the industry standards in § 250.901. (ii) If you are installing a floating platform, you must also adhere to U.S. Coast Guard (USCG) regulations for the fabrication, installation, and inspection of floating OCS facilities.

(2) Major modification to any platform. This includes any structural changes that materially alter the approved plan or cause a major deviation from approved operations and any modification that increases loading on a platform by 10 percent or more | (i) You must adhere to the requirements of this subpart, including the industry standards in § 250.901. (ii) Before you make a major modification to a floating platform, you must obtain approval from both the BSEE and the USCG for the modification.

(3) Major repair of damage to any platform. This includes any corrective operations involving structural members affecting the structural integrity of a portion or all of the platform | (i) You must adhere to the requirements of this subpart, including the industry standards in § 250.901. (ii) Before you make a major repair to a floating platform, you must obtain approval from both the BSEE and the USCG for the repair.

(4) Convert an existing platform at the current location for a new purpose | (i) The Regional Supervisor will determine on a case-by-case basis the requirements for an application for conversion of an existing platform at the current location. (ii) At a minimum, your application must include: the converted platform's intended use; and a demonstration of the adequacy of the design and structural condition of the converted platform. (iii) If a floating platform, you must also adhere to USCG regulations for the fabrication, installation, and inspection of floating OCS facilities.

(5) Convert an existing mobile offshore drilling unit (MODU) for a new purpose | (i) The Regional Supervisor will determine on a case-by-case basis the requirements for an application for conversion of an existing MODU. (ii) At a minimum, your application must include: the converted MODU's intended location and use; a demonstration of the adequacy of the design and structural condition of the converted MODU; and a demonstration that the level of safety for the converted MODU is at least equal to that of re-used platforms. (iii) You must also adhere to USCG regulations for the fabrication, installation, and inspection of floating OCS facilities.

(c) Under emergency conditions, you may make repairs to primary structural elements to restore an existing permitted condition without submitting an application or receiving prior BSEE approval for up to 120-calendar days following an event. You must notify the Regional Supervisor of the damage that occurred within 24 hours of its discovery, and you must provide a written completion report to the Regional Supervisor of the repairs that were made within 1 week after completing the repairs. If you make emergency repairs on a floating platform, you must also notify the USCG.

(d) You must determine if your new platform or major modification to an existing platform is subject to the Platform Verification Program (PVP). Section 250.910 of this subpart fully describes the facilities that are subject to the PVP. If you determine that your platform is subject to the PVP, you must follow the requirements of §§ 250.909 through 250.918 of this subpart.

(e) You must submit notification of the platform installation date and the final as-built location data to the Regional Supervisor within 45-calendar days of completion of platform installation.

(1) For platforms not subject to the Platform Verification Program (PVP), BSEE will cancel the approved platform application 1 year after the approval has been granted if the platform has not been installed. If BSEE cancels the approval, you must resubmit your platform application and receive BSEE approval if you still plan to install the platform.

(2) For platforms subject to the PVP, cancellation of an approval will be on an individual platform basis. For these platforms, BSEE will identify the date when the installation approval will be cancelled (if installation has not occurred) during the application and approval process. If BSEE cancels your installation approval, you must resubmit your platform application and receive BSEE approval if you still plan to install the platform.

§ 250.901 What industry standards must your platform meet?

(a) In addition to the other requirements of this subpart, your plans for platform design, analysis, fabrication, installation, use, maintenance, inspection and assessment must, as appropriate, conform to:

(1) ACI Standard 318-95, Building Code Requirements for Reinforced Concrete (ACI 318-95) and Commentary (ACI 318R-95) (incorporated by reference, see § 250.198);

(2) ACI 357R-84, Guide for the Design and Construction of Fixed Offshore Concrete Structures, 1984; reapproved 1997 (incorporated by reference, see § 250.198);

(3) ANSI/AISC 360-05, Specification for Structural Steel Buildings, (incorporated by reference, see § 250.198);

(4) API Recommended Practice 2A-WSD (incorporated by reference, see § 250.198);

(5) API Recommended Practice 2FPS (incorporated by reference, see § 250.198);

(6) API Recommended Practice 2I (incorporated by reference, see § 250.198);

(7) API Recommended Practice 2RD (incorporated by reference, see § 250.198);

(8) API Recommended Practice 2SK (incorporated by reference, see § 250.198);

(9) API Recommended Practice 2SM (incorporated by reference, see § 250.198);

(10) API Recommended Practice 2T (incorporated by reference, see § 250.198);

(11) API Recommended Practice 14J (incorporated by reference, see § 250.198);

(12) ASTM C33-07 (incorporated by reference, see § 250.198);

(13) ASTM C94/C 94M-07 (incorporated by reference, see § 250.198);

(14) ASTM C150-07 (incorporated by reference, see § 250.198);

(15) ASTM C330-05 (incorporated by reference, see § 250.198);

(16) ASTM C595-08 (incorporated by reference, see § 250.198);

(17) AWS D1.1, Structural Welding Code—Steel, including Commentary, (incorporated by reference, see § 250.198);

(18) AWS D1.4, Structural Welding Code—Reinforcing Steel, (incorporated by reference, see § 250.198);

(19) AWS D3.6M, Specification for Underwater Welding, (incorporated by reference, see § 250.198);

(20) NACE Standard MR0175, Sulfide Stress Cracking Resistant Metallic Materials for Oilfield Equipment, (incorporated by reference, see § 250.198);

(21) NACE Standard RP0176-2003, Item No. 21018, Standard Recommended Practice, Corrosion Control of Steel Fixed Offshore Structures Associated with Petroleum Production (incorporated by reference, see § 250.198).

(22) API Recommended Practice 2FSIM (incorporated by reference, see § 250.198);

(23) ANSI/API Recommended Practice 2GEO (incorporated by reference, see § 250.198);

(24) ANSI/API Recommended Practice 2MET (incorporated by reference, see § 250.198);

(25) API Recommended Practice 2MIM (incorporated by reference, see § 250.198);

(26) API Recommended Practice 2RIM (incorporated by reference, see § 250.198); and

(27) API Recommended Practice 2SIM (incorporated by reference, see § 250.198).

(b) You must follow the requirements contained in the documents listed under paragraph (a) of this section insofar as they do not conflict with other provisions of 30 CFR part 250. You may use applicable provisions of these documents, as approved by the Regional Supervisor, for the design, fabrication, and installation of platforms such as spars, since standards specifically written for such structures do not exist. You may also use alternative codes, rules, or standards, as approved by the Regional Supervisor, under the conditions enumerated in § 250.141.

(c) For information on the standards mentioned in this section, and where they may be obtained, see § 250.198 of this part.

(d) The following chart summarizes the applicability of the industry standards listed in this section for fixed and floating platforms:

Industry standard | Applicable to . . .

(1) ACI Standard 318-95 and ACI 318R-95; | Fixed and floating platform, as appropriate.

(2) ANSI/AISC 360-05;

(3) API Recommended Practice 2A-WSD;

(4) ASTM C33-07;

(5) ASTM C94/C 94M-07;

(6) ASTM C150-07;

(7) ASTM C330-05;

(8) ASTM C595-08;

(9) AWS D1.1:2000;

(10) AWS D1.4-98;

(11) AWS D3.6M:1999;

(12) NACE Standard RP0176-2003;

(13) ACI 357R-84; | Fixed platforms.

(14) API Recommended Practice 14J; | Floating platforms.

(15) API Recommended Practice 2FPS;

(16) API Recommended Practice 2RD;

(17) API Recommended Practice 2SK;

(18) API Recommended Practice 2T;

(19) API Recommended Practice 2SM;

(20) API Recommended Practice 2I;

(21) API Recommended Practice 2FSIM;

(22) ANSI/API Recommended Practice 2GEO;

(23) ANSI/API Recommended Practice 2MET;

(24) API Recommended Practice 2SIM;

(25) API Recommended Practice 2MIM;

(26) API Recommended Practice 2RIM;

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016; 91 FR 35358, June 10, 2026]

§ 250.902 What are the requirements for platform removal and location clearance?

You must remove all structures according to §§ 250.1725 through 250.1730 of Subpart Q—Decommissioning Activities of this part.

§ 250.903 What records must I keep?

(a) You must compile, retain, and make available to BSEE representatives for the functional life of all platforms:

(1) The as-built drawings;

(2) The design assumptions and analyses;

(3) A summary of the fabrication and installation nondestructive examination records;

(4) The inspection results from the inspections required by § 250.919 of this subpart; and

(5) Records of repairs not covered in the inspection report submitted under § 250.919(b).

(b) You must record and retain the original material test results of all primary structural materials during all stages of construction. Primary material is material that, should it fail, would lead to a significant reduction in platform safety, structural reliability, or operating capabilities. Items such as steel brackets, deck stiffeners and secondary braces or beams would not generally be considered primary structural members (or materials).

(c) You must provide BSEE with the location of these records in the certification statement of your application for platform approval as required in § 250.905(j).

112 Platform Approval Program
§ 250.904 What is the Platform Approval Program?

(a) The Platform Approval Program is the BSEE basic approval process for platforms on the OCS. The requirements of the Platform Approval Program are described in §§ 250.904 through 250.908 of this subpart. Completing these requirements will satisfy BSEE criteria for approval of fixed platforms of a proven design that will be placed in the shallow water areas (≤400 ft.) of the Gulf of America OCS.

(b) The requirements of the Platform Approval Program must be met by all platforms on the OCS. Additionally, if you want approval for a floating platform; a platform of unique design; or a platform being installed in deepwater (> 400 ft.) or a frontier area, you must also meet the requirements of the Platform Verification Program. The requirements of the Platform Verification Program are described in §§ 250.909 through 250.918 of this subpart.

[81 FR 26022, Apr. 29, 2016, as amended at 90 FR 44327, Sept. 15, 2025]

§ 250.905 How do I get approval for the installation, modification, or repair of my platform?

The Platform Approval Program requires that you submit the information, documents, and fee listed in the following table for your proposed project. In lieu of submitting the paper copies specified in the table, you may submit your application electronically in accordance with 30 CFR 250.186(a)(3).

Required submittal | Required contents | Other requirements

(a) Application cover letter | Proposed structure designation, lease number, area, name, and block number, and the type of facility your facility (e.g., drilling, production, quarters). The structure designation must be unique for the field (some fields are made up of several blocks); i.e. once a platform “A” has been used in the field there should never be another platform “A” even if the old platform “A” has been removed. Single well free standing caissons should be given the same designation as the well. All other structures are to be designated by letter designations | You must submit three copies. If, your facility is subject to the Platform Verification Program (PVP), you must submit four copies.

(b) Location plat | Latitude and longitude coordinates, Universal Mercator grid-system coordinates, state plane coordinates in the Lambert or Transverse Mercator Projection System, and distances in feet from the nearest block lines. These coordinates must be based on the NAD (North American Datum) 27 datum plane coordinate system | Your plat must be drawn to a scale of 1 inch equals 2,000 feet and include the coordinates of the lease block boundary lines. You must submit three copies.

(c) Front, Side, and Plan View drawings | Platform dimensions and orientation, elevations relative to M.L.L.W. (Mean Lower Low Water), and pile sizes and penetration | Your drawing sizes must not exceed 11″ × 17″. You must submit three copies (four copies for PVP applications).

(d) Complete set of structural drawings | The approved for construction fabrication drawings should be submitted including; e.g., cathodic protection systems; jacket design; pile foundations; drilling, production, and pipeline risers and riser tensioning systems; turrets and turret-and-hull interfaces; mooring and tethering systems; foundations and anchoring systems | Your drawing sizes must not exceed 11″ × 17″. You must submit one copy.

(e) Summary of environmental data | A summary of the environmental data described in the applicable standards referenced under § 250.901(a) of this subpart and in § 250.198 of Subpart A, where the data is used in the design or analysis of the platform. Examples of relevant data include information on waves, wind, current, tides, temperature, snow and ice effects, marine growth, and water depth | You must submit one copy.

(f) Summary of the engineering design data | Loading information (e.g., live, dead, environmental), structural information (e.g., design-life; material types; cathodic protection systems; design criteria; fatigue life; jacket design; deck design; production component design; pile foundations; drilling, production, and pipeline risers and riser tensioning systems; turrets and turret-and-hull interfaces; foundations, foundation pilings and templates, and anchoring systems; mooring or tethering systems; fabrication and installation guidelines), and foundation information (e.g., soil stability, design criteria) | You must submit one copy.

(g) Project-specific studies used in the platform design or installation | All studies pertinent to platform design or installation, e.g., oceanographic and/or soil reports including the overall site investigative report required in § 250.906 | You must submit one copy of each study.

(h) Description of the loads imposed on the facility | Loads imposed by jacket; decks; production components; drilling, production, and pipeline risers, and riser tensioning systems; turrets and turret-and-hull interfaces; foundations, foundation pilings and templates, and anchoring systems; and mooring or tethering systems | You must submit one copy.

(i) Summary of safety factors utilized | A summary of pertinent derived factors of safety against failure for major structural members, e.g., unity check ratios exceeding 0.85 for steel-jacket platform members, indicated on “line” sketches of jacket sections | You must submit one copy.

(j) A copy of the in-service inspection plan | This plan is described in § 250.919 | You must submit one copy.

(k) Certification statement | The following statement: “The design of this structure has been certified by a recognized classification society, or a registered civil or structural engineer or equivalent, or a naval architect or marine engineer or equivalent, specializing in the design of offshore structures. The certified design and as-built plans and specifications will be on file at (give location)” | An authorized company representative must sign the statement. You must submit one copy.

(l) Payment of the service fee listed in § 250.125.

§ 250.906 What must I do to obtain approval for the proposed site of my platform?

(a) Shallow hazards surveys. You must perform a high-resolution or acoustic-profiling survey to obtain information on the conditions existing at and near the surface of the seafloor. You must collect information through this survey sufficient to determine the presence of the following features and their likely effects on your proposed platform:

(1) Shallow faults;

(2) Gas seeps or shallow gas;

(3) Slump blocks or slump sediments;

(4) Shallow water flows;

(5) Hydrates; or

(6) Ice scour of seafloor sediments.

(b) Geologic surveys. You must perform a geological survey relevant to the design and siting of your platform. Your geological survey must assess:

(1) Seismic activity at your proposed site;

(2) Fault zones, the extent and geometry of faulting, and attenuation effects of geologic conditions near your site; and

(3) For platforms located in producing areas, the possibility and effects of seafloor subsidence.

(c) Subsurface surveys. Depending upon the design and location of your proposed platform and the results of the shallow hazard and geologic surveys, the Regional Supervisor may require you to perform a subsurface survey. This survey will include a testing program for investigating the stratigraphic and engineering properties of the soil that may affect the foundations or anchoring systems for your facility. The testing program must include adequate in situ testing, boring, and sampling to examine all important soil and rock strata to determine its strength classification, deformation properties, and dynamic characteristics. If required to perform a subsurface survey, you must prepare and submit to the Regional Supervisor a summary report to briefly describe the results of your soil testing program, the various field and laboratory test methods employed, and the applicability of these methods as they pertain to the quality of the samples, the type of soil, and the anticipated design application. You must explain how the engineering properties of each soil stratum affect the design of your platform. In your explanation you must describe the uncertainties inherent in your overall testing program, and the reliability and applicability of each test method.

(d) Overall site investigation report. You must prepare and submit to the Regional Supervisor an overall site investigation report for your platform that integrates the findings of your shallow hazards surveys and geologic surveys, and, if required, your subsurface surveys. Your overall site investigation report must include analyses of the potential for:

(1) Scouring of the seafloor;

(2) Hydraulic instability;

(3) The occurrence of sand waves;

(4) Instability of slopes at the platform location;

(5) Liquefaction, or possible reduction of soil strength due to increased pore pressures;

(6) Degradation of subsea permafrost layers;

(7) Cyclic loading;

(8) Lateral loading;

(9) Dynamic loading;

(10) Settlements and displacements;

(11) Plastic deformation and formation collapse mechanisms; and

(12) Soil reactions on the platform foundations or anchoring systems.

§ 250.907 Where must I locate foundation boreholes?

(a) For fixed or bottom-founded platforms and tension leg platforms, your maximum distance from any foundation pile to a soil boring must not exceed 500 feet.

(b) For deepwater floating platforms which utilize catenary or taut-leg moorings, you must take borings at the most heavily loaded anchor location, at the anchor points approximately 120 and 240 degrees around the anchor pattern from that boring, and, as necessary, other points throughout the anchor pattern to establish the soil profile suitable for foundation design purposes.

§ 250.908 What are the minimum structural fatigue design requirements?

(a) API Recommended Practice 2A-WSD (incorporated by reference, see § 250.198), requires that the design fatigue life of each joint and member be twice the intended service life of the structure.When designing your platform, the following table provides minimum fatigue life safety factors for critical structural members and joints.

If . . . | Then . . .

(1) There is sufficient structural redundancy to prevent catastrophic failure of the platform or structure under consideration, | The results of the fatigue analysis must indicate a minimum calculated life of twice the design life of the platform.

(2) There is not sufficient structural redundancy to prevent catastrophic failure of the platform or structure, | The results of a fatigue analysis must indicate a minimum calculated life or three times the design life of the platform.

(3) The desirable degree of redundancy is significantly reduced as a result of fatigue damage, | The results of a fatigue analysis must indicate a minimum calculated life of three times the design life of the platform.

(b) The documents incorporated by reference in § 250.901 may require larger safety factors than indicated in paragraph (a) of this section for some key components. When the documents incorporated by reference require a larger safety factor than the chart in paragraph (a) of this section, the requirements of the incorporated document will prevail.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016; 91 FR 35359, June 10, 2026]

113 Platform Verification Program
§ 250.909 What is the Platform Verification Program?

The Platform Verification Program is the BSEE approval process for ensuring that floating platforms; platforms of a new or unique design; platforms in seismic areas; or platforms located in deepwater or frontier areas meet stringent requirements for design and construction. The program is applied during construction of new platforms and major modifications of, or repairs to, existing platforms. These requirements are in addition to the requirements of the Platform Approval Program described in §§ 250.904 through 250.908 of this subpart.

§ 250.910 Which of my facilities are subject to the Platform Verification Program?

(a) All new fixed or bottom-founded platforms that meet any of the following five conditions are subject to the Platform Verification Program:

(1) Platforms installed in water depths exceeding 400 feet (122 meters);

(2) Platforms having natural periods in excess of 3 seconds;

(3) Platforms installed in areas of unstable bottom conditions;

(4) Platforms having configurations and designs which have not previously been used or proven for use in the area; or

(5) Platforms installed in seismically active areas.

(b) All new floating platforms are subject to the Platform Verification Program to the extent indicated in the following table:

If . . . | Then . . .

(1) Your new floating platform is a buoyant offshore facility that does not have a ship-shaped hull, | The entire platform is subject to the Platform Verification Program including the following associated structures:

(i) Drilling, production, and pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser does not have tensioning systems); (ii) Turrets and turret-and-hull interfaces; (iii) Foundations, foundation pilings and templates, and anchoring systems; and (iv) Mooring or tethering systems.

(2) Your new floating platform is a buoyant offshore facility with a ship-shaped hull, | Only the following structures that may be associated with a floating platform are subject to the Platform Verification Program:

(i) Drilling, production, and pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser tensioning systems); (ii) Turrets and turret-and-hull interfaces; (iii) Foundations, foundation pilings and templates, and anchoring systems; and (iv) Mooring or tethering systems.

(c) If a platform is originally subject to the Platform Verification Program, then the conversion of that platform at that same site for a new purpose, or making a major modification of, or major repair to, that platform, is also subject to the Platform Verification Program. A major modification includes any modification that increases loading on a platform by 10 percent or more. A major repair is a corrective operation involving structural members affecting the structural integrity of a portion or all of the platform. Before you make a major modification or repair to a floating platform, you must obtain approval from both the BSEE and the USCG.

(d) The applicability of Platform Verification Program requirements to other types of facilities will be determined by BSEE on a case-by-case basis.

§ 250.911 If my platform is subject to the Platform Verification Program, what must I do?

If your platform, conversion, or major modification or repair meets the criteria in § 250.910, you must:

(a) Design, fabricate, install, use, maintain and inspect your platform, conversion, or major modification or repair to your platform according to the requirements of this subpart, and the applicable documents listed in § 250.901(a) of this subpart;

(b) Comply with all the requirements of the Platform Approval Program found in §§ 250.904 through 250.908 of this subpart.

(c) Submit for the Regional Supervisor's approval three copies each of the design verification, fabrication verification, and installation verification plans required by § 250.912;

(d) Submit a complete schedule of all phases of design, fabrication, and installation for the Regional Supervisor's approval. You must include a project management timeline, Gantt Chart, that depicts when interim and final reports required by §§ 250.916, 250.917, and 250.918 will be submitted to the Regional Supervisor for each phase. On the timeline, you must break-out the specific scopes of work that inherently stand alone (e.g., deck, mooring systems, tendon systems, riser systems, turret systems).

(e) Include your nomination of a Certified Verification Agent (CVA) as a part of each verification plan required by § 250.912;

(f) Follow the additional requirements in §§ 250.913 through 250.918;

(g) Obtain approval for modifications to approved plans and for major deviations from approved installation procedures from the Regional Supervisor; and

(h) Comply with applicable USCG regulations for floating OCS facilities.

§ 250.912 What plans must I submit under the Platform Verification Program?

If your platform, associated structure, or major modification meets the criteria in § 250.910, you must submit the following plans to the Regional Supervisor for approval:

(a) Design verification plan. You may submit your design verification plan to BSEE with or subsequent to the submittal of your Development and Production Plan (DPP) or Development Operations Coordination Document (DOCD) to BOEM. Your design verification must be conducted by, or be under the direct supervision of, a registered professional civil or structural engineer or equivalent, or a naval architect or marine engineer or equivalent, with previous experience in directing the design of similar facilities, systems, structures, or equipment. For floating platforms, you must ensure that the requirements of the USCG for structural integrity and stability, e.g., verification of center of gravity, etc., have been met. Your design verification plan must include the following:

(1) All design documentation specified in § 250.905 of this subpart;

(2) Abstracts of the computer programs used in the design process; and

(3) A summary of the major design considerations and the approach to be used to verify the validity of these design considerations.

(b) Fabrication verification plan. The Regional Supervisor must approve your fabrication verification plan before you may initiate any related operations. Your fabrication verification plan must include the following:

(1) Fabrication drawings and material specifications for artificial island structures and major members of concrete-gravity and steel-gravity structures;

(2) For jacket and floating structures, all the primary load-bearing members included in the space-frame analysis; and

(3) A summary description of the following:

(i) Structural tolerances;

(ii) Welding procedures;

(iii) Material (concrete, gravel, or silt) placement methods;

(iv) Fabrication standards;

(v) Material quality-control procedures;

(vi) Methods and extent of nondestructive examinations for welds and materials; and

(vii) Quality assurance procedures.

(c) Installation verification plan. The Regional Supervisor must approve your installation verification plan before you may initiate any related operations. Your installation verification plan must include:

(1) A summary description of the planned marine operations;

(2) Contingencies considered;

(3) Alternative courses of action; and

(4) An identification of the areas to be inspected. You must specify the acceptance and rejection criteria to be used for any inspections conducted during installation, and for the post-installation verification inspection.

(d) You must combine fabrication verification and installation verification plans for manmade islands or platforms fabricated and installed in place.

§ 250.913 When must I resubmit Platform Verification Program plans?

(a) You must resubmit any design verification, fabrication verification, or installation verification plan to the Regional Supervisor for approval if:

(1) The CVA changes;

(2) The CVA's or assigned personnel's qualifications change; or

(3) The level of work to be performed changes.

(b) If only part of a verification plan is affected by one of the changes described in paragraph (a) of this section, you can resubmit only the affected part. You do not have to resubmit the summary of technical details unless you make changes in the technical details.

§ 250.914 How do I nominate a CVA?

(a) As part of your design verification, fabrication verification, or installation verification plan, you must nominate a CVA for the Regional Supervisor's approval. You must specify whether the nomination is for the design, fabrication, or installation phase of verification, or for any combination of these phases.

(b) For each CVA, you must submit a list of documents to be forwarded to the CVA, and a qualification statement that includes the following:

(1) Previous experience in third-party verification or experience in the design, fabrication, installation, or major modification of offshore oil and gas platforms. This should include fixed platforms, floating platforms, manmade islands, other similar marine structures, and related systems and equipment;

(2) Technical capabilities of the individual or the primary staff for the specific project;

(3) Size and type of organization or corporation;

(4) In-house availability of, or access to, appropriate technology. This should include computer programs, hardware, and testing materials and equipment;

(5) Ability to perform the CVA functions for the specific project considering current commitments;

(6) Previous experience with BSEE requirements and procedures;

(7) The level of work to be performed by the CVA.

§ 250.915 What are the CVA's primary responsibilities?

(a) The CVA must conduct specified reviews according to §§ 250.916, 250.917, and 250.918 of this subpart.

(b) Individuals or organizations acting as CVAs must not function in any capacity that would create a conflict of interest, or the appearance of a conflict of interest.

(c) The CVA must consider the applicable provisions of the documents listed in § 250.901(a); the alternative codes, rules, and standards approved under § 250.901(b); and the requirements of this subpart.

(d) The CVA is the primary contact with the Regional Supervisor and is directly responsible for providing immediate reports of all incidents that affect the design, fabrication and installation of the platform.

§ 250.916 What are the CVA's primary duties during the design phase?

(a) The CVA must use good engineering judgment and practices in conducting an independent assessment of the design of the platform, major modification, or repair. The CVA must ensure that the platform, major modification, or repair is designed to withstand the environmental and functional load conditions appropriate for the intended service life at the proposed location.

(b) Primary duties of the CVA during the design phase include the following:

Type of facility . . . | The CVA must . . .

(1) For fixed platforms and non-ship-shaped floating facilities, | Conduct an independent assessment of all proposed: (i) Planning criteria;

(ii) Operational requirements;

(iii) Environmental loading data;

(iv) Load determinations;

(v) Stress analyses;

(vi) Material designations;

(vii) Soil and foundation conditions;

(viii) Safety factors; and

(ix) Other pertinent parameters of the proposed design.

(2) For all floating facilities, | Ensure that the requirements of the U.S. Coast Guard for structural integrity and stability, e.g., verification of center of gravity, etc., have been met. The CVA must also consider:

(i) Drilling, production, and pipeline risers, and riser tensioning systems;

(ii) Turrets and turret-and-hull interfaces;

(iii) Foundations, foundation pilings and templates, and anchoring systems; and

(iv) Mooring or tethering systems.

(c) The CVA must submit interim reports and a final report to the Regional Supervisor, and to you, during the design phase in accordance with the approved schedule required by § 250.911(d). In each interim and final report the CVA must:

(1) Provide a summary of the material reviewed and the CVA's findings;

(2) In the final CVA report, make a recommendation that the Regional Supervisor either accept, request modifications, or reject the proposed design unless such a recommendation has been previously made in an interim report;

(3) Describe the particulars of how, by whom, and when the independent review was conducted; and

(4) Provide any additional comments the CVA deems necessary.

§ 250.917 What are the CVA's primary duties during the fabrication phase?

(a) The CVA must use good engineering judgment and practices in conducting an independent assessment of the fabrication activities. The CVA must monitor the fabrication of the platform or major modification to ensure that it has been built according to the approved design and the fabrication plan. If the CVA finds that fabrication procedures are changed or design specifications are modified, the CVA must inform you. If you accept the modifications, then the CVA must so inform the Regional Supervisor.

(b) Primary duties of the CVA during the fabrication phase include the following:

Type of facility . . . | The CVA must . . .

(1) For all fixed platforms and non-ship-shaped floating facilities, | Make periodic onsite inspections while fabrication is in progress and must verify the following fabrication items, as appropriate:

(i) Quality control by lessee and builder;

(ii) Fabrication site facilities;

(iii) Material quality and identification methods;

(iv) Fabrication procedures specified in the approved plan, and adherence to such procedures;

(v) Welder and welding procedure qualification and identification;

(vi) Structural tolerances specified and adherence to those tolerances;

(vii) The nondestructive examination requirements, and evaluation results of the specified examinations;

(viii) Destructive testing requirements and results;

(ix) Repair procedures;

(x) Installation of corrosion-protection systems and splash-zone protection;

(xi) Erection procedures to ensure that overstressing of structural members does not occur;

(xii) Alignment procedures;

(xiii) Dimensional check of the overall structure, including any turrets, turret-and-hull interfaces, any mooring line and chain and riser tensioning line segments; and

(xiv) Status of quality-control records at various stages of fabrication.

(2) For all floating facilities, | Ensure that the requirements of the U.S. Coast Guard floating for structural integrity and stability, e.g., verification of center of gravity, etc., have been met. The CVA must also consider:

(i) Drilling, production, and pipeline risers, and riser tensioning systems (at least for the initial fabrication of these elements);

(ii) Turrets and turret-and-hull interfaces;

(iii) Foundation pilings and templates, and anchoring systems; and

(iv) Mooring or tethering systems.

(c) The CVA must submit interim reports and a final report to the Regional Supervisor, and to you, during the fabrication phase in accordance with the approved schedule required by § 250.911(d). In each interim and final report the CVA must:

(1) Give details of how, by whom, and when the independent monitoring activities were conducted;

(2) Describe the CVA's activities during the verification process;

(3) Summarize the CVA's findings;

(4) Confirm or deny compliance with the design specifications and the approved fabrication plan;

(5) In the final CVA report, make a recommendation to accept or reject the fabrication unless such a recommendation has been previously made in an interim report; and

(6) Provide any additional comments that the CVA deems necessary.

§ 250.918 What are the CVA's primary duties during the installation phase?

(a) The CVA must use good engineering judgment and practice in conducting an independent assessment of the installation activities.

(b) Primary duties of the CVA during the installation phase include the following:

The CVA must . . . | Operation or equipment to be inspected . . .

(1) Verify, as appropriate, | (i) Loadout and initial flotation operations;

(ii) Towing operations to the specified location, and review the towing records;

(iii) Launching and uprighting operations;

(iv) Submergence operations;

(v) Pile or anchor installations;

(vi) Installation of mooring and tethering systems;

(vii) Final deck and component installations; and

(viii) Installation at the approved location according to the approved design and the installation plan.

(2) Witness (for a fixed or floating platform), | (i) The loadout of the jacket, decks, piles, or structures from each fabrication site;

(ii) The actual installation of the platform or major modification and the related installation activities.

(3) Witness (for a floating platform), | (i) The loadout of the platform;

(ii) The installation of drilling, production, and pipeline risers, and riser tensioning systems (at least for the initial installation of these elements);

(iii) The installation of turrets and turret-and-hull interfaces;

(iv) The installation of foundation pilings and templates, and anchoring systems; and

(v) The installation of the mooring and tethering systems.

(4) Conduct an onsite survey, | Survey the platform after transportation to the approved location.

(5) Spot-check as necessary to determine compliance with the applicable documents listed in § 250.901(a); the alternative codes, rules and standards approved under § 250.901(b); the requirements listed in § 250.903 and §§ 250.906 through 250.908 of this subpart and the approved plans, | (i) Equipment; (ii) Procedures; and (iii) Recordkeeping.

(c) The CVA must submit interim reports and a final report to the Regional Supervisor, and to you, during the installation phase in accordance with the approved schedule required by § 250.911(d). In each interim and final report the CVA must:

(1) Give details of how, by whom, and when the independent monitoring activities were conducted;

(2) Describe the CVA's activities during the verification process;

(3) Summarize the CVA's findings;

(4) Confirm or deny compliance with the approved installation plan;

(5) In the final report, make a recommendation to accept or reject the installation unless such a recommendation has been previously made in an interim report; and

(6) Provide any additional comments that the CVA deems necessary.

114 Inspection, Maintenance, and Assessment of Platforms
§ 250.919 What in-service inspection requirements must I meet?

(a) You must submit a comprehensive in-service inspection report annually by November 1 to the Regional Supervisor that must include:

(1) A list of fixed and floating platforms you inspected in the preceding 12 months;

(2) The extent and area of inspection for both the above-water and underwater portions of the platform and the pertinent components of the mooring system for floating platforms;

(3) The type of inspection employed (e.g., visual, magnetic particle, ultrasonic testing);

(4) The overall structural condition of each platform, including a corrosion protection evaluation; and

(5) A summary of the inspection results indicating what repairs, if any, were needed.

(b) If any of your structures have been exposed to a natural occurrence (e.g., hurricane, earthquake, or tropical storm), the Regional Supervisor may require you to submit an initial report of all structural damage, followed by subsequent updates, which include the following:

(1) A list of affected structures;

(2) A timetable for conducting the inspections described in section 6.6 of API Recommended Practice 2SIM (incorporated by reference, see § 250.198); and

(3) An inspection plan for each structure that describes the work you will perform to determine the condition of the structure.

(c) The Regional Supervisor may also require you to submit the results of the inspections referred to in paragraph (b)(2) of this section, including a description of any detected damage that may adversely affect structural integrity, an assessment of the structure's ability to withstand any anticipated environmental conditions, and any remediation plans. Under §§ 250.900(b)(3) and 250.905, you must obtain approval from BSEE before you make major repairs of any damage unless you meet the requirements of § 250.900(c).

(d) You must perform an in-service inspection for each of your platforms according to the time intervals described in Section 6.5.3 Table 3 (Default Inspection Program) of API Recommended Practice 2SIM. You must follow the specific time interval from Table 3 that applies to your platform based on the exposure category BSEE has accepted under § 250.920 and the platform's survey level established in accordance with Section 6.5 of API Recommended Practice 2SIM. You are not required to comply with Section 6.5.2.2 (Risk Based Inspection Intervals) of API Recommended Practice 2SIM.

[76 FR 64462, Oct. 18, 2011, as amended at 91 FR 35359, June 10, 2026]

§ 250.920 What are the BSEE requirements for assessment of fixed platforms?

(a) You must document all wells, equipment, and pipelines supported by the platform if you intend to use either the L-2 or L-3 exposure category. Exposure categories are defined in API Recommended Practice 2SIM, Section 5.3.4 (incorporated by reference, see § 250.198). If BSEE objects to the exposure category you used for your assessment, you may need to redesign and/or modify the platform to adequately demonstrate that the platform is able to withstand the environmental loadings for the appropriate exposure category.

(b) You must perform an analysis check when your platform will have additional personnel, additional topside facilities, increased environmental or operational loading, inadequate deck height, or suffered significant damage (e.g., experienced damage to primary structural members or conductor guide trays or global structural integrity is adversely affected); or the exposure category changes to a more restrictive level (see Section 8.3 of API Recommended Practice 2SIM for a description of assessment initiators).

(c) You must initiate mitigation actions for platforms that do not pass the assessment process of API Recommended Practice 2SIM. You must submit applications for your mitigation actions (e.g., repair, modification, decommissioning) to the Regional Supervisor for approval before you conduct the work.

(d) The BSEE may require you to conduct a platform design basis check when the reduced environmental loading criteria contained in API Recommended Practice 2SIM Sections 9 through 12 are not applicable.

(e) By November 1, 2009, you must submit a complete list of all the platforms you operate, together with all the appropriate data to support the assessment category you assign to each platform and the platform assessment initiators (as defined in API Recommended Practice 2SIM) to the Regional Supervisor. You must submit subsequent complete lists and the appropriate data to support the consequence-of-failure category every 5 years thereafter, or as directed by the Regional Supervisor.

(f) The use of API Recommended Practice 2SIM is limited to existing fixed structures that are serving their original approved purpose. You must obtain approval from the Regional Supervisor for any change in purpose of the platform, following the provisions of Section 18, Re-use, in API Recommended Practice 2A-WSD (incorporated by reference, see § 250.198).

[91 FR 35359, June 10, 2026]

§ 250.921 How do I analyze my platform for cumulative fatigue?

(a) If you are required to analyze cumulative fatigue on your platform because of the results of an inspection or platform assessment, you must ensure that the safety factors for critical elements listed in § 250.908 are met or exceeded.

(b) If the calculated life of a joint or member does not meet the criteria of § 250.908, you must either mitigate the load, strengthen the joint or member, or develop an increased inspection process.

Subpart J Pipelines and Pipeline Rights-of-Way
§ 250.1000 General requirements.

(a) Pipelines and associated valves, flanges, and fittings shall be designed, installed, operated, maintained, and abandoned to provide safe and pollution-free transportation of fluids in a manner which does not unduly interfere with other uses in the Outer Continental Shelf (OCS).

(b) An application must be accompanied by payment of the service fee listed in § 250.125 and submitted to the Regional Supervisor and approval obtained before:

(1) Installation, modification, or abandonment of a lease term pipeline;

(2) Installation or modification of a right-of-way (other than lease term) pipeline; or

(3) Modification or relinquishment of a pipeline right-of way.

(c)(1) Department of the Interior (DOI) pipelines, as defined in § 250.1001, must meet the requirements in §§ 250.1000 through 250.1008.

(2) A pipeline right-of-way grant holder must identify in writing to the Regional Supervisor the operator of any pipeline located on its right-of-way, if the operator is different from the right-of-way grant holder.

(3) A producing operator must identify for its own records, on all existing pipelines located on its lease or right-of-way, the specific points at which operating responsibility transfers to a transporting operator.

(i) Each producing operator must, if practical, durably mark all of its above-water transfer points as of the date a pipeline begins service.

(ii) If it is not practical to durably mark a transfer point, and the transfer point is located above water, then the operator must identify the transfer point on a schematic located on the facility.

(iii) If a transfer point is located below water, then the operator must identify the transfer point on a schematic and provide the schematic to BSEE upon request.

(iv) If adjoining producing and transporting operators cannot agree on a transfer point, the BSEE Regional Supervisor and the appropriate Department of Transportation (DOT) pipeline official may jointly determine the transfer point.

(4) The transfer point serves as a regulatory boundary. An operator may request that the BSEE Regional Supervisor grant an exception to this requirement for an individual facility or area. The Regional Supervisor, in consultation with the appropriate DOT pipeline official and affected parties, may grant the request.

(5) Pipeline segments designed, constructed, maintained, and operated under DOT regulations but transferring to DOI regulation as of October 16, 1998, may continue to operate under DOT design and construction requirements until significant modifications or repairs are made to those segments. After October 16, 1998, BSEE operational and maintenance requirements will apply to those segments.

(6) Any producer operating a pipeline that crosses into State waters without first connecting to a transporting operator's facility on the OCS must comply with this subpart. Compliance must extend from the point where hydrocarbons are first produced, through and including the last valve and associated safety equipment (e.g., pressure safety sensors) on the last production facility on the OCS.

(7) Any producer operating a pipeline that connects facilities on the OCS must comply with this subpart.

(8) Any operator of a pipeline that has a valve on the OCS downstream (landward) of the last production facility may ask in writing that the BSEE Regional Supervisor recognize that valve as the last point BSEE will exercise its regulatory authority.

(9) A pipeline segment is not subject to BSEE regulations for design, construction, operation, and maintenance if:

(i) It is downstream (generally shoreward) of the last valve and associated safety equipment on the last production facility on the OCS; and

(ii) It is subject to regulation under 49 CFR parts 192 and 195.

(10) DOT may inspect all upstream safety equipment (including valves, over-pressure protection devices, cathodic protection equipment, and pigging devices, etc.) that serve to protect the integrity of DOT-regulated pipeline segments.

(11) OCS pipeline segments not subject to DOT regulation under 49 CFR parts 192 and 195 are subject to all BSEE regulations.

(12) A producer may request that its pipeline operate under DOT regulations governing pipeline design, construction, operation, and maintenance.

(i) The operator's request must be in the form of a written petition to the BSEE Regional Supervisor that states the justification for the pipeline to operate under DOT regulation.

(ii) The Regional Supervisor will decide, on a case-by-case basis, whether to grant the operator's request. In considering each petition, the Regional Supervisor will consult with the appropriate DOT pipeline official.

(13) A transporter who operates a pipeline regulated by DOT may request to operate under BSEE regulations governing pipeline operation and maintenance. Any subsequent repairs or modifications will also be subject to BSEE regulations governing design and construction.

(i) The operator's request must be in the form of a written petition to the appropriate DOT pipeline official and the BSEE Regional Supervisor.

(ii) The BSEE Regional Supervisor and the appropriate DOT pipeline official will decide how to act on this petition.

(d) A pipeline which qualifies as a right-of-way pipeline (see § 250.1001, Definitions) shall not be installed until a right-of-way has been requested and granted in accordance with this subpart.

(e)(1) The Regional Supervisor may suspend any pipeline operation upon a determination by the Regional Supervisor that continued activity would threaten or result in serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, mineral deposits, or the marine, coastal, or human environment.

(2) The Regional Supervisor may also suspend pipeline operations or a right-of-way grant if the Regional Supervisor determines that the lessee or right-of-way holder has failed to comply with a provision of the Act or any other applicable law, a provision of these or other applicable regulations, or a condition of a permit or right-of-way grant.

(3) The Secretary of the Interior (Secretary) may cancel a pipeline permit or right-of-way grant in accordance with 43 U.S.C. 1334(a)(2). A right-of-way grant may be forfeited in accordance with 43 U.S.C. 1334(e).

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1001 Definitions.

Terms used in this subpart shall have the meanings given below:

DOI pipelines include:

(1) Producer-operated pipelines extending upstream (generally seaward) from each point on the OCS at which operating responsibility transfers from a producing operator to a transporting operator;

(2) Producer-operated pipelines extending upstream (generally seaward) of the last valve (including associated safety equipment) on the last production facility on the OCS that do not connect to a transporter-operated pipeline on the OCS before crossing into State waters;

(3) Producer-operated pipelines connecting production facilities on the OCS;

(4) Transporter-operated pipelines that DOI and DOT have agreed are to be regulated as DOI pipelines; and

(5) All OCS pipelines not subject to regulation under 49 CFR parts 192 and 195.

DOT pipelines include:

(1) Transporter-operated pipelines currently operated under DOT requirements governing design, construction, maintenance, and operation;

(2) Producer-operated pipelines that DOI and DOT have agreed are to be regulated under DOT requirements governing design, construction, maintenance, and operation; and

(3) Producer-operated pipelines downstream (generally shoreward) of the last valve (including associated safety equipment) on the last production facility on the OCS that do not connect to a transporter-operated pipeline on the OCS before crossing into State waters and that are regulated under 49 CFR parts 192 and 195.

Lease term pipelines are those pipelines owned and operated by a lessee or operator and are wholly contained within the boundaries of a single lease, unitized leases, or contiguous (not cornering) leases of that lessee or operator.

Out-of-service pipelines are those pipelines that have not been used to transport oil, natural gas, sulfur, or produced water for more than 30 consecutive days.

Pipelines are the piping, risers, and appurtenances installed for the purpose of transporting oil, gas, sulphur, and produced water. (Piping confined to a production platform or structure is covered in Subpart H, Production Safety Systems, and is excluded from this subpart.)

Production facilities means OCS facilities that receive hydrocarbon production either directly from wells or from other facilities that produce hydrocarbons from wells. They may include processing equipment for treating the production or separating it into its various liquid and gaseous components before transporting it to shore.

Right-of-way pipelines are those pipelines which—

(1) Are contained within the boundaries of a single lease or group of unitized leases but are not owned and operated by the lessee or operator of that lease or unit,

(2) Are contained within the boundaries of contiguous (not cornering) leases which do not have a common lessee or operator,

(3) Are contained within the boundaries of contiguous (not cornering) leases which have a common lessee or operator but are not owned and operated by that common lessee or operator, or

(4) Cross any portion of an unleased block(s).

§ 250.1002 Design requirements for DOI pipelines.

(a) The internal design pressure for steel pipe shall be determined in accordance with the following formula:

Formula 1 to Paragraph (a)

For limitations see section 841.121 of ANSI B31.8 (incorporated by reference, see § 250.198) where—

P = Internal design pressure in pounds per square inch (psi). S = Specified minimum yield strength, in psi, stipulated in the specification under which the pipe was purchased from the manufacturer or determined in accordance with section 811.253(h) of ANSI B31.8. D = Nominal outside diameter of pipe, in inches. t = Nominal wall thickness, in inches. F = Construction design factor of 0.72 for the submerged component and 0.60 for the riser component. E = Longitudinal joint factor obtained from Table 841.1B of ANSI B31.8 (see also section 811.253(d)). T = Temperature derating factor obtained from Table 841.1C of ANSI B31.8.

(b)(1) Pipeline valves shall meet the minimum design requirements of API Specification 6A, API Specification 6D (both incorporated by reference, see § 250.198), or the equivalent. A valve may not be used under operating conditions that exceed the applicable pressure-temperature ratings contained in those standards.

(2) Pipeline flanges and flange accessories shall meet the minimum design requirements of ANSI/ASME B16.5-2003, API Specification 6A (incorporated by reference, see § 250.198), or the equivalent. Each flange assembly must be able to withstand the maximum pressure at which the pipeline is to be operated and to maintain its physical and chemical properties at any temperature to which it is anticipated that it might be subjected in service.

(3) Pipeline fittings shall have pressure-temperature ratings based on stresses for pipe of the same or equivalent material. The actual bursting strength of the fitting shall at least be equal to the computed bursting strength of the pipe.

(4) If you are installing pipelines constructed of unbonded flexible pipe, you must design them according to the standards and procedures of API Specification 17J (incorporated by reference, see § 250.198).

(5) You must design pipeline risers for tension leg platforms and other floating platforms according to the design standards of API Recommended Practice 2RD (incorporated by reference, see § 250.198).

(c) The maximum allowable operating pressure (MAOP) shall not exceed the least of the following:

(1) Internal design pressure of the pipeline, valves, flanges, and fittings;

(2) Eighty percent of the hydrostatic pressure test (HPT) pressure of the pipeline; or

(3) If applicable, the MAOP of the receiving pipeline when the proposed pipeline and the receiving pipeline are connected at a subsea tie-in.

(d) If the maximum source pressure (MSP) exceeds the pipeline's MAOP, you must install and maintain redundant safety devices meeting the requirements of section A9 of API Recommended Practice 14C (incorporated by reference, see § 250.198). Pressure safety valves (PSV) may be used only after a determination by the Regional Supervisor that the pressure will be relieved in a safe and pollution-free manner. The setting level at which the primary and redundant safety equipment actuates shall not exceed the pipeline's MAOP.

(e) Pipelines shall be provided with an external protective coating capable of minimizing underfilm corrosion and a cathodic protection system designed to mitigate corrosion for at least 20 years.

(f) Pipelines shall be designed and maintained to mitigate any reasonably anticipated detrimental effects of water currents, storm or ice scouring, soft bottoms, mud slides, earthquakes, subfreezing temperatures, and other environmental factors.

[76 FR 64462, Oct. 18, 2011, as amended at 83 FR 49263, Sept. 28, 2018; 91 FR 35359, June 10, 2026]

§ 250.1003 Installation, testing, and repair requirements for DOI pipelines.

(a)(1) Pipelines greater than 8 5/8 inches in diameter and installed in water depths of less than 200 feet shall be buried to a depth of at least 3 feet unless they are located in pipeline congested areas or seismically active areas as determined by the Regional Supervisor. Nevertheless, the Regional Supervisor may require burial of any pipeline if the Regional Supervisor determines that such burial will reduce the likelihood of environmental degradation or that the pipeline may constitute a hazard to trawling operations or other uses. A trawl test or diver survey may be required to determine whether or not pipeline burial is necessary or to determine whether a pipeline has been properly buried.

(2) Pipeline valves, taps, tie-ins, capped lines, and repaired sections that could be obstructive shall be provided with at least 3 feet of cover unless the Regional Supervisor determines that such items present no hazard to trawling or other operations. A protective device may be used to cover an obstruction in lieu of burial if it is approved by the Regional Supervisor prior to installation.

(3) Pipelines shall be installed with a minimum separation of 18 inches at pipeline crossings and from obstructions.

(4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before April 1, 1988, may be required when the Regional Supervisor determines that significant damage potential exists.

(b)(1) Pipelines shall be pressure tested with water at a stabilized pressure of at least 1.25 times the MAOP for at least 8 hours when installed, relocated, uprated, or reactivated after being out-of-service for more than 1 year.

(2) Prior to returning a pipeline to service after a repair, the pipeline shall be pressure tested with water or processed natural gas at a minimum stabilized pressure of at least 1.25 times the MAOP for at least 2 hours.

(3) Pipelines shall not be pressure tested at a pressure which produces a stress in the pipeline in excess of 95 percent of the specified minimum-yield strength of the pipeline. A temperature recorder measuring test fluid temperature synchronized with a pressure recorder along with deadweight test readings shall be employed for all pressure testing. When a pipeline is pressure tested, no observable leakage shall be allowed. Pressure gauges and recorders shall be of sufficient accuracy to verify that leakage is not occurring.

(4) The Regional Supervisor may require pressure testing of pipelines to verify the integrity of the system when the Regional Supervisor determines that there is a reasonable likelihood that the line has been damaged or weakened by external or internal conditions.

(c) When a pipeline is repaired utilizing a clamp, the clamp shall be a full encirclement clamp able to withstand the anticipated pipeline pressure.

§ 250.1004 Safety equipment requirements for DOI pipelines.

(a) The lessee shall ensure the proper installation, operation, and maintenance of safety devices required by this section on all incoming, departing, and crossing pipelines on platforms.

(b)(1)(i) Incoming pipelines to a platform shall be equipped with a flow safety valve (FSV).

(ii) For sulphur operations, incoming pipelines delivering gas to the power plant platform may be equipped with high- and low-pressure sensors (PSHL), which activate audible and visual alarms in lieu of requirements in paragraph (b)(1)(i) of this section. The PSHL shall be set at 15 percent or 5 psi, whichever is greater, above and below the normal operating pressure range.

(2) Incoming pipelines boarding a production platform shall be equipped with an automatic shutdown valve (SDV) immediately upon boarding the platform. The SDV shall be connected to the automatic- and remote-emergency shut-in systems.

(3) Departing pipelines receiving production from production facilities shall be protected by high- and low-pressure sensors (PSHL) to directly or indirectly shut in all production facilities. The PSHL shall be set not to exceed 15 percent above and below the normal operating pressure range. However, high pilots shall not be set above the pipeline's MAOP.

(4) Crossing pipelines on production or manned nonproduction platforms which do not receive production from the platform shall be equipped with an SDV immediately upon boarding the platform. The SDV shall be operated by a PSHL on the departing pipelines and connected to the platform automatic- and remote-emergency shut-in systems.

(5) The Regional Supervisor may require that oil pipelines be equipped with a metering system to provide a continuous volumetric comparison between the input to the line at the structure(s) and the deliveries onshore. The system shall include an alarm system and shall be of adequate sensitivity to detect variations between input and discharge volumes. In lieu of the foregoing, a system capable of detecting leaks in the pipeline may be substituted with the approval of the Regional Supervisor.

(6) Pipelines incoming to a subsea tie-in shall be equipped with a block valve and an FSV. Bidirectional pipelines connected to a subsea tie-in shall be equipped with only a block valve.

(7) Gas-lift or water-injection pipelines on unmanned platforms need only be equipped with an FSV installed immediately upstream of each casing annulus or the first inlet valve on the christmas tree.

(8) Bidirectional pipelines shall be equipped with a PSHL and an SDV immediately upon boarding each platform.

(9) Pipeline pumps must comply with section A7 of API Recommended Practice 14C (incorporated by reference, see § 250.198). The setting levels for the PSHL devices are specified in paragraph (b)(3) of this section.

(c) If the required safety equipment is rendered ineffective or removed from service on pipelines which are continued in operation, an equivalent degree of safety shall be provided. The safety equipment shall be identified by the placement of a sign on the equipment stating that the equipment is rendered ineffective or removed from service.

[76 FR 64462, Oct. 18, 2011, as amended at 91 FR 35360, June 10, 2026]

§ 250.1005 Inspection requirements for DOI pipelines.

(a) Pipeline routes shall be inspected at time intervals and methods prescribed by the Regional Supervisor for indication of pipeline leakage. The results of these inspections shall be retained for at least 2 years and be made available to the Regional Supervisor upon request.

(b) When pipelines are protected by rectifiers or anodes for which the initial life expectancy of the cathodic protection system either cannot be calculated or calculations indicate a life expectancy of less than 20 years, such pipelines shall be inspected annually by taking measurements of pipe-to-electrolyte potential.

§ 250.1006 How must I decommission and take out of service a DOI pipeline?

(a) The requirements for decommissioning pipelines are listed in § 250.1750 through § 250.1754.

(b) The table in this section lists the requirements if you take a DOI pipeline out of service:

If you have the pipeline out of service for: | Then you must:

(1) 1 year or less, | Isolate the pipeline with a blind flange or a closed block valve at each end of the pipeline.

(2) More than 1 year but less than 5 years, | Flush and fill the pipeline with inhibited seawater.

(3) 5 or more years, | Decommission the pipeline according to §§ 250.1750-250.1754.

§ 250.1007 What to include in applications.

(a) Applications to install a lease term pipeline or for a pipeline right-of-way grant must be submitted in quadruplicate to the Regional Supervisor. Right-of-way grant applications must include an identification of the operator of the pipeline. Each application must include the following:

(1) Plat(s) drawn to a scale specified by the Regional Supervisor showing major features and other pertinent data including area, lease, and block designations; water depths; route; length in Federal waters; width of right-of-way, if applicable; connecting facilities; size; product(s) to be transported with anticipated gravity or density; burial depth; direction of flow; X-Y coordinates of key points; and the location of other pipelines that will be connected to or crossed by the proposed pipeline(s). The initial and terminal points of the pipeline and any continuation into State jurisdiction shall be accurately located even if the pipeline is to have an onshore terminal point. A plat(s) submitted for a pipeline right-of-way shall bear a signed certificate upon its face by the engineer who made the map that certifies that the right-of-way is accurately represented upon the map and that the design characteristics of the associated pipeline are in accordance with applicable regulations.

(2) A schematic drawing showing the size, weight, grade, wall thickness, and type of line pipe and risers; pressure-regulating devices (including back-pressure regulators); sensing devices with associated pressure-control lines; PSV's and settings; SDV's, FSV's, and block valves; and manifolds. This schematic drawing shall also show input source(s), e.g., wells, pumps, compressors, and vessels; maximum input pressure(s); the rated working pressure, as specified by ANSI or API, of all valves, flanges, and fittings; the initial receiving equipment and its rated working pressure; and associated safety equipment and pig launchers and receivers. The schematic must indicate the point on the OCS at which operating responsibility transfers between a producing operator and a transporting operator.

(3) General information as follows:

(i) Description of cathodic protection system. If pipeline anodes are to be used, specify the type, size, weight, number, spacing, and anticipated life;

(ii) Description of external pipeline coating system;

(iii) Description of internal protective measures;

(iv) Specific gravity of the empty pipe;

(v) MSP;

(vi) MAOP and calculations used in its determination;

(vii) Hydrostatic test pressure, medium, and period of time that the line will be tested;

(viii) MAOP of the receiving pipeline or facility,

(ix) Proposed date for commencing installation and estimated time for construction; and

(x) Type of protection to be afforded crossing pipelines, subsea valves, taps, and manifold assemblies, if applicable.

(4) A description of any additional design precautions you took to enable the pipeline to withstand the effects of water currents, storm or ice scouring, soft bottoms, mudslides, earthquakes, permafrost, and other environmental factors.

(i) If you propose to use unbonded flexible pipe, your application must include:

(A) The manufacturer's design specification sheet;

(B) The design pressure (psi);

(C) An identification of the design standards you used; and

(D) A review by a third-party independent verification agent (IVA) according to API Specification 17J (incorporated by reference, see § 250.198), if applicable.

(ii) If you propose to use one or more pipeline risers for a tension leg platform or other floating platform, your application must include:

(A) The design fatigue life of the riser, with calculations, and the fatigue point at which you would replace the riser;

(B) The results of your vortex-induced vibration (VIV) analysis;

(C) An identification of the design standards you used; and

(D) A description of any necessary mitigation measures such as the use of helical strakes or anchoring devices.

(5) The application shall include a shallow hazards survey report and, if required by the Regional Director, an archaeological resource report that covers the entire length of the pipeline. A shallow hazards analysis may be included in a lease term pipeline application in lieu of the shallow hazards survey report with the approval of the Regional Director. The Regional Director may require the submission of the data upon which the report or analysis is based.

(b) Applications to modify an approved lease term pipeline or right-of-way grant shall be submitted in quadruplicate to the Regional Supervisor. These applications need only address those items in the original application affected by the proposed modification.

[76 FR 64462, Oct. 18, 2011, as amended at 83 FR 49263, Sept. 28, 2018; 91 FR 35360, June 10, 2026]

§ 250.1008 Reports.

(a) The lessee, or right-of-way holder, shall notify the Regional Supervisor at least 48 hours prior to commencing the installation or relocation of a pipeline or conducting a pressure test on a pipeline.

(b) The lessee or right-of-way holder shall submit a report to the Regional Supervisor within 90 days after completion of any pipeline construction. The report, submitted in triplicate, shall include an “as-built” location plat drawn to a scale specified by the Regional Supervisor showing the location, length in Federal waters, and X-Y coordinates of key points; the completion date; the proposed date of first operation; and the HPT data. Pipeline right-of-way “as-built” location plats shall be certified by a registered engineer or land surveyor and show the boundaries of the right-of-way as granted. If there is a substantial deviation of the pipeline route as granted in the right-of-way, the report shall include a discussion of the reasons for such deviation.

(c) The lessee or right-of-way holder shall report to the Regional Supervisor any pipeline taken out of service. If the period of time in which the pipeline is out of service is greater than 60 days, written confirmation is also required.

(d) The lessee or right-of-way holder shall report to the Regional Supervisor when any required pipeline safety equipment is taken out of service for more than 12 hours. The Regional Supervisor shall be notified when the equipment is returned to service.

(e) The lessee or right-of-way holder must notify the Regional Supervisor before the repair of any pipeline or as soon as practicable. Your notification must be accompanied by payment of the service fee listed in § 250.125. You must submit a detailed report of the repair of a pipeline or pipeline component to the Regional Supervisor within 30 days after the completion of the repairs. In the report you must include the following:

(1) Description of repairs;

(2) Results of pressure test; and

(3) Date returned to service.

(f) The Regional Supervisor may require that DOI pipeline failures be analyzed and that samples of a failed section be examined in a laboratory to assist in determining the cause of the failure. A comprehensive written report of the information obtained shall be submitted by the lessee to the Regional Supervisor as soon as available.

(g) If the effects of scouring, soft bottoms, or other environmental factors are observed to be detrimentally affecting a pipeline, a plan of corrective action shall be submitted to the Regional Supervisor for approval within 30 days of the observation. A report of the remedial action taken shall be submitted to the Regional Supervisor by the lessee or right-of-way holder within 30 days after completion.

(h) The results and conclusions of measurements of pipe-to-electrolyte potential measurements taken annually on DOI pipelines in accordance with § 250.1005(b) of this part shall be submitted to the Regional Supervisor by the lessee before March of each year.

§ 250.1009 Requirements to obtain pipeline right-of-way grants.

(a) In addition to applicable requirements of §§ 250.1000 through 250.1008 and other regulations of this part, regulations of the Department of Transportation, Department of the Army, and the Federal Energy Regulatory Commission (FERC), when a pipeline qualifies as a right-of-way pipeline, the pipeline shall not be installed until a right-of-way has been requested and granted in accordance with this subpart. The right-of-way grant is issued pursuant to 43 U.S.C. 1334(e) and may be acquired and held only by citizens and nationals of the United States; aliens lawfully admitted for permanent residence in the United States as defined in 8 U.S.C. 1101(a)(20); private, public, or municipal corporations organized under the laws of the United States or territory thereof, the District of Columbia, or of any State; or associations of such citizens, nationals, resident aliens, or private, public, or municipal corporations, States, or political subdivisions of States.

(b) A right-of-way shall include the site on which the pipeline and associated structures are to be situated, shall not exceed 200 feet in width unless safety and environmental factors during construction and operation of the associated right-of-way pipeline require a greater width, and shall be limited to the area reasonably necessary for pumping stations or other accessory structures.

§ 250.1010 General requirements for pipeline right-of-way holders.

An applicant, by accepting a right-of-way grant, agrees to comply with the following requirements:

(a) The right-of-way holder shall comply with applicable laws and regulations and the terms of the grant.

(b) The granting of the right-of-way shall be subject to the express condition that the rights granted shall not prevent or interfere in any way with the management, administration, or the granting of other rights by the United States, either prior or subsequent to the granting of the right-of-way. Moreover, the holder agrees to allow the occupancy and use by the United States, its lessees, or other right-of-way holders, of any part of the right-of-way grant not actually occupied or necessarily incident to its use for any necessary operations involved in the management, administration, or the enjoyment of such other granted rights.

(c) If the right-of-way holder discovers any archaeological resource while conducting operations within the right-of-way, the right-of-way holder shall immediately halt operations within the area of the discovery and report the discovery to the Regional Director. If investigations determine that the resource is significant, the Regional Director will inform the right-of-way holder how to protect it.

(d) The Regional Supervisor shall be kept informed at all times of the right-of-way holder's address and, if a corporation, the address of its principal place of business and the name and address of the officer or agent authorized to be served with process.

(e) The right-of-way holder shall pay the United States or its lessees or right-of-way holders, as the case may be, the full value of all damages to the property of the United States or its said lessees or right-of-way holders and shall indemnify the United States against any and all liability for damages to life, person, or property arising from the occupation and use of the area covered by the right-of-way grant.

(f)(1) The holder of a right-of-way oil or gas pipeline shall transport or purchase oil or natural gas produced from submerged lands in the vicinity of the pipeline without discrimination and in such proportionate amounts as the FERC may, after a full hearing with due notice thereof to the interested parties, determine to be reasonable, taking into account, among other things, conservation and the prevention of waste.

(2) Unless otherwise exempted by FERC pursuant to 43 U.S.C. 1334(f)(2), the holder shall:

(i) Provide open and nondiscriminatory access to a right-of-way pipeline to both owner and nonowner shippers, and

(ii) Comply with the provisions of 43 U.S.C. 1334(f)(1)(B) under which FERC may order an expansion of the throughput capacity of a right-of-way pipeline which is approved after September 18, 1978, and which is not located in the Gulf of America or the Santa Barbara Channel.

(g) The area covered by a right-of-way and all improvements thereon shall be kept open at all reasonable times for inspection by the Bureau of Safety and Environmental Enforcement (BSEE). The right-of-way holder shall make available all records relative to the design, construction, operation, maintenance and repair, and investigations on or with regard to such area.

(h) Upon relinquishment, forfeiture, or cancellation of a right-of-way grant, the right-of-way holder shall remove all platforms, structures, domes over valves, pipes, taps, and valves along the right-of-way. All of these improvements shall be removed by the holder within 1 year of the effective date of the relinquishment, forfeiture, or cancellation unless this requirement is waived in writing by the Regional Supervisor. All such improvements not removed within the time provided herein shall become the property of the United States but that shall not relieve the holder of liability for the cost of their removal or for restoration of the site. Furthermore, the holder is responsible for accidents or damages which might occur as a result of failure to timely remove improvements and equipment and restore a site. An application for relinquishment of a right-of-way grant shall be filed in accordance with § 250.1019 of this part.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 44327, Sept. 15, 2025]

§ 250.1011 [Reserved]
§ 250.1012 Required payments for pipeline right-of-way holders.

(a) You must pay ONRR, under the regulations at 30 CFR part 1218, an annual rental of $15 for each statute mile, or part of a statute mile, of the OCS that your pipeline right-of-way crosses.

(b) This paragraph applies to you if you obtain a pipeline right-of-way that includes a site for an accessory to the pipeline, including but not limited to a platform. This paragraph also applies if you apply to modify a right-of-way to change the site footprint. In either case, you must pay the amounts shown in the following table.

If . . . | Then . . .

(1) Your accessory site is located in water depths of less than 200 meters; | You must pay ONRR, under the regulations at 30 CFR part 1218, a rental of $5 per acre per year with a minimum of $450 per year. The area subject to annual rental includes the areal extent of anchor chains, pipeline risers, and other facilities and devices associated with the accessory.

(2) Your accessory site is located in water depths of 200 meters or greater; | You must pay ONRR, under the regulations at 30 CFR part 1218, a rental of $7.50 per acre per year with a minimum of $675 per year. The area subject to annual rental includes the areal extent of anchor chains, pipeline risers, and other facilities and devices associated with the accessory.

(c) If you hold a pipeline right-of-way that includes a site for an accessory to your pipeline and you are not covered by paragraph (b) of this section, then you must pay ONRR, under the regulations at 30 CFR part 1218, an annual rental of $75 for use of the affected area.

(d) You may make the rental payments required by paragraphs (a), (b)(1), (b)(2), and (c) of this section on an annual basis, for a 5-year period, or for multiples of 5 years. You must make the first payment at the time you submit the pipeline right-of-way application. You must make all subsequent payments before the respective time periods begin.

(e) Late payments. An interest charge will be assessed on unpaid and underpaid amounts from the date the amounts are due, in accordance with the provisions found in 30 CFR 1218.54. If you fail to make a payment that is late after written notice from ONRR, BSEE may initiate cancellation of the right-of-use grant and easement under § 250.1013.

§ 250.1013 Grounds for forfeiture of pipeline right-of-way grants.

Failure to comply with the Act, regulations, or any conditions of the right-of-way grant prescribed by the Regional Supervisor shall be grounds for forfeiture of the grant in an appropriate judicial proceeding instituted by the United States in any U.S. District Court having jurisdiction in accordance with the provisions of 43 U.S.C. 1349.

§ 250.1014 When pipeline right-of-way grants expire.

Any right-of-way granted under the provisions of this subpart remains in effect as long as the associated pipeline is properly maintained and used for the purpose for which the grant was made, unless otherwise expressly stated in the grant. Temporary cessation or suspension of pipeline operations shall not cause the grant to expire. However, if the purpose of the grant ceases to exist or use of the associated pipeline is permanently discontinued for any reason, the grant shall be deemed to have expired.

§ 250.1015 Applications for pipeline right-of-way grants.

(a) You must submit an original and three copies of an application for a new or modified pipeline ROW grant to the Regional Supervisor. The application must address those items required by § 250.1007(a) or (b) of this subpart, as applicable. It must also state the primary purpose for which you will use the ROW grant. If the ROW has been used before the application is made, the application must state the date such use began, by whom, and the date the applicant obtained control of the improvement. When you file your application, you must pay the rental required under § 250.1012 of this subpart, as well as the service fees listed in § 250.125 of this part for a pipeline ROW grant to install a new pipeline, or to convert an existing lease term pipeline into a ROW pipeline. An application to modify an approved ROW grant must be accompanied by the additional rental required under § 250.1012 if applicable. You must file a separate application for each ROW.

(b)(1) An individual applicant shall submit a statement of citizenship or nationality with the application. An applicant who is an alien lawfully admitted for permanent residence in the United States shall also submit evidence of such status with the application.

(2) If the applicant is an association (including a partnership), the application shall also be accompanied by a certified copy of the articles of association or appropriate reference to a copy of such articles already filed with BSEE and a statement as to any subsequent amendments.

(3) If the applicant is a corporation, the application shall also include the following:

(i) A statement certified by the Secretary or Assistant Secretary of the corporation with the corporate seal showing the State in which it is incorporated and the name of the person(s) authorized to act on behalf of the corporation, or

(ii) In lieu of such a statement, an appropriate reference to statements or records previously submitted to BSEE (including material submitted in compliance with prior regulations).

(c) The application shall include a list of every lessee and right-of-way holder whose lease or right-of-way is intersected by the proposed right-of-way. The application shall also include a statement that a copy of the application has been sent by registered or certified mail to each such lessee or right-of-way holder.

(d) The applicant shall include in the application an original and three copies of a completed Nondiscrimination in Employment form (YN 3341-1 dated July 1982). These forms are available at each BSEE regional office.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1016 Granting pipeline rights-of-way.

(a) In considering an application for a right-of-way, the Regional Supervisor shall consider the potential effect of the associated pipeline on the human, marine, and coastal environments, life (including aquatic life), property, and mineral resources in the entire area during construction and operational phases. The Regional Supervisor shall prepare an environmental analysis in accordance with applicable policies and guidelines. To aid in the evaluation and determinations, the Regional Supervisor may request and consider views and recommendations of appropriate Federal Agencies, hold public meetings after appropriate notice, and consult, as appropriate, with State agencies, organizations, industries, and individuals. Before granting a pipeline right-of-way, the Regional Supervisor shall give consideration to any recommendation by the intergovernmental planning program, or similar process, for the assessment and management of OCS oil and gas transportation.

(b) Should the proposed route of a right-of-way adjoin and subsequently cross any State submerged lands, the applicant shall submit evidence to the Regional Supervisor that the State(s) so affected has reviewed the application. The applicant shall also submit any comment received as a result of that review. In the event of a State recommendation to relocate the proposed route, the Regional Supervisor may consult with the appropriate State officials.

(c)(1) The applicant shall submit photocopies of return receipts to the Regional Supervisor that indicate the date that each lessee or right-of-way holder referenced in § 250.1015(c) of this part has received a copy of the application. Letters of no objection may be submitted in lieu of the return receipts.

(2) The Regional Supervisor shall not take final action on a right-of-way application until the Regional Supervisor is satisfied that each such lessee or right-of-way holder has been afforded at least 30 days from the date determined in paragraph (c)(1) of this section in which to submit comments.

(d) If a proposed right-of-way crosses any lands not subject to disposition by mineral leasing or restricted from oil and gas activities, it shall be rejected by the Regional Supervisor unless the Federal Agency with jurisdiction over such excluded or restricted area gives its consent to the granting of the right-of-way. In such case, the applicant, upon a request filed within 30 days after receipt of the notification of such rejection, shall be allowed an opportunity to eliminate the conflict.

(e)(1) If the application and other required information are found to be in compliance with applicable laws and regulations, the right-of-way may be granted. The Regional Supervisor may prescribe, as conditions to the right-of-way grant, stipulations necessary to protect human, marine, and coastal environments, life (including aquatic life), property, and mineral resources located on or adjacent to the right-of-way.

(2) If the Regional Supervisor determines that a change in the application should be made, the Regional Supervisor shall notify the applicant that an amended application shall be filed subject to stipulated changes. The Regional Supervisor shall determine whether the applicant shall deliver copies of the amended application to other parties for comment.

(3) A decision to reject an application shall be in writing and shall state the reasons for the rejection.

§ 250.1017 Requirements for construction under pipeline right-of-way grants.

(a) Failure to construct the associated right-of-way pipeline within 5 years of the date of the granting of a right-of-way shall cause the grant to expire.

(b)(1) A right-of-way holder shall ensure that the right-of-way pipeline is constructed in a manner that minimizes deviations from the right-of-way as granted.

(2) If, after constructing the right-of-way pipeline, it is determined that a deviation from the proposed right-of-way as granted has occurred, the right-of-way holder shall—

(i) Notify the operators of all leases and holders of all right-of-way grants in which a deviation has occurred, and within 60 days of the date of the acceptance by the Regional Supervisor of the completion of pipeline construction report, provide the Regional Supervisor with evidence of such notification; and

(ii) Relinquish any unused portion of the right-of-way.

(3) Substantial deviation of a right-of-way pipeline as constructed from the proposed right-of-way as granted may be grounds for forfeiture of the right-of-way.

(c) If the Regional Supervisor determines that a significant change in conditions has occurred subsequent to the granting of a right-of-way but prior to the commencement of construction of the associated pipeline, the Regional Supervisor may suspend or temporarily prohibit the commencement of construction until the right-of-way grant is modified to the extent necessary to address the changed conditions.

§ 250.1018 Assignment of pipeline right-of-way grants.

(a) Assignment may be made of a right-of-way grant, in whole or of any lineal segment thereof, subject to the approval of the Regional Supervisor. An application for approval of an assignment of a right-of-way or of a lineal segment thereof, shall be filed in triplicate with the Regional Supervisor.

(b) Any application for approval for an assignment, in whole or in part, of any right, title, or interest in a right-of-way grant must be accompanied by the same showing of qualifications of the assignees as is required of an applicant for a ROW in § 250.1015 of this subpart and must be supported by a statement that the assignee agrees to comply with and to be bound by the terms and conditions of the ROW grant. The assignee must satisfy the bonding requirements in 30 CFR 550.1011. No transfer will be recognized unless and until it is first approved, in writing, by the Regional Supervisor. The assignee must pay the service fee listed in § 250.125 of this part for a pipeline ROW assignment request.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1019 Relinquishment of pipeline right-of-way grants.

A right-of-way grant or a portion thereof may be surrendered by the holder by filing a written relinquishment in triplicate with the Regional Supervisor. It must contain those items addressed in §§ 250.1751 and 250.1752 of this part. A relinquishment shall take effect on the date it is filed subject to the satisfaction of all outstanding debts, fees, or fines and the requirements in § 250.1010(h) of this part.

Subpart K Oil and Gas Production Requirements
115 General
§ 250.1150 What are the general reservoir production requirements?

You must produce wells and reservoirs at rates that provide for economic development while maximizing ultimate recovery and without adversely affecting correlative rights.

116 Well Tests and Surveys
§ 250.1151 How often must I conduct well production tests?

(a) You must conduct well production tests as shown in the following table:

You must conduct: | And you must submit to the Regional Supervisor:

(1) A well-flow potential test on all new, recompleted, or reworked well completions within 30 days of the date of first continuous production, | Form BSEE-0126, Well Potential Test Report, along with the supporting data as listed in the table in § 250.1167, within 15 days after the end of the test period.

(2) At least one well test during a calendar half-year for each producing completion, | Results on Form BSEE-0128, Semiannual Well Test Report, of the most recent well test obtained. This must be submitted within 45 days after the end of the calendar half-year.

(b) You may request an extension from the Regional Supervisor if you cannot submit the results of a semiannual well test within the specified time.

(c) You must submit to the Regional Supervisor an original and two copies of the appropriate form required by paragraph (a) of this section; one of the copies of the form must be a public information copy in accordance with §§ 250.186 and 250.197, and marked “Public Information.” You must submit two copies of the supporting information as listed in the table in § 250.1167 with form BSEE-0126.

§ 250.1152 How do I conduct well tests?

(a) When you conduct well tests you must:

(1) Recover fluid from the well completion equivalent to the amount of fluid introduced into the formation during completion, recompletion, reworking, or treatment operations before you start a well test;

(2) Produce the well completion under stabilized rate conditions for at least 6 consecutive hours before beginning the test period;

(3) Conduct the test for at least 4 consecutive hours;

(4) Adjust measured gas volumes to the standard conditions of 14.73 pounds per square inch absolute (psia) and 60 °F for all tests; and

(5) Use measured specific gravity values to calculate gas volumes.

(b) You may request approval from the Regional Supervisor to conduct a well test using alternative procedures if you can demonstrate test reliability under those procedures.

(c) The Regional Supervisor may also require you to conduct the following tests and complete them within a specified time period:

(1) A retest or a prolonged test of a well completion if it is determined to be necessary for the proper establishment of a Maximum Production Rate (MPR) or a Maximum Efficient Rate (MER); and

(2) A multipoint back-pressure test to determine the theoretical open-flow potential of a gas well.

(d) A BSEE representative may witness any well test. Upon request, you must provide advance notice to the Regional Supervisor of the times and dates of well tests.

§§ 250.1153-250.1155 [Reserved]
117 Approvals Prior to Production
§ 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line?

(a) You must obtain approval from the Regional Supervisor before you start producing from a reservoir within a well that has any portion of the completed interval less than 500 feet from a unit or lease line. Submit to BSEE the service fee listed in § 250.125, according to the instructions in § 250.126, and the supporting information, as listed in the table in § 250.1167, with your request. The Regional Supervisor will determine whether approval of your request will maximize ultimate recovery, avoid the waste of natural resources, or protect correlative rights. You do not need to obtain approval if the adjacent leases or units have the same unit, lease (record title and operating rights), and royalty interests as the lease or unit you plan to produce. You do not need to obtain approval if the adjacent block is unleased.

(b) You must notify the operator(s) of adjacent property(ies) that are within 500 feet of the completion, if the adjacent acreage is a leased block in the Federal OCS. You must provide the Regional Supervisor proof of the date of the notification. The operators of the adjacent properties have 30 days after receiving the notification to provide the Regional Supervisor letters of acceptance or objection. If an adjacent operator does not respond within 30 days, the Regional Supervisor will presume there are no objections and proceed with a decision. The notification must include:

(1) The well name;

(2) The rectangular coordinates (x, y) of the location of the top and bottom of the completion or target completion referenced to the North American Datum 1983, and the subsea depths of the top and bottom of the completion or target completion;

(3) The distance from the completion or target completion to the unit or lease line at its nearest point; and

(4) A statement indicating whether or not it will be a high-capacity completion having a perforated or open hole interval greater than 150 feet measured depth.

§ 250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?

(a) You must request and receive approval from the Regional Supervisor:

(1) Before producing gas-cap gas from each completion in an oil reservoir that is known to have an associated gas cap.

(2) To continue production from a well if the oil reservoir is not initially known to have an associated gas cap, but the oil well begins to show characteristics of a gas well.

(b) For either request, you must submit the service fee listed in § 250.125, according to the instructions in § 250.126, and the supporting information, as listed in the table in § 250.1167, with your request.

(c) The Regional Supervisor will determine whether your request maximizes ultimate recovery.

§ 250.1158 How do I receive approval to downhole commingle hydrocarbons?

(a) Before you perforate a well, you must request and receive approval from the Regional Supervisor to commingle hydrocarbons produced from multiple reservoirs within a common wellbore. The Regional Supervisor will approve a request of an operator to commingle hydrocarbons unless he or she finds, based on conclusive evidence, that the commingling could not be conducted by the operator in a safe manner or that the commingling would reduce ultimate recovery from the applicable reservoirs. You must also include the service fee listed in § 250.125, according to the instructions in § 250.126, and the supporting information, as listed in the table in § 250.1167, with your request.

(b) If one or more of the reservoirs proposed for commingling is a competitive reservoir, you must notify the operators of all leases that contain the reservoir that you intend to downhole commingle the reservoirs. Your request for approval of downhole commingling must include proof of the date of this notification. The notified operators have 30 days after notification to provide the Regional Supervisor with letters of acceptance or objection. If the notified operators do not respond within the specified period, the Regional Supervisor will assume the operators do not object and proceed with a decision.

[76 FR 64462, Oct. 18, 2011, as amended at 90 FR 38938, Aug. 13, 2025; 91 FR 10001, Mar. 2, 2026]

118 Production Rates
§ 250.1159 May the Regional Supervisor limit my well or reservoir production rates?

(a) The Regional Supervisor may set a Maximum Production Rate (MPR) for a producing well completion, or set a Maximum Efficient Rate (MER) for a reservoir, or both, if the Regional Supervisor determines that an excessive production rate could harm ultimate recovery. An MPR or MER will be based on well tests and any limitations imposed by well and surface equipment, sand production, reservoir sensitivity, gas-oil and water-oil ratios, location of perforated intervals, and prudent operating practices.

(b) If the Regional Supervisor sets an MPR for a producing well completion and/or an MER for a reservoir, you may not exceed those rates except due to normal variations and fluctuations in production rates as set by the Regional Supervisor.

119 Flaring, Venting, and Burning Hydrocarbons
§ 250.1160 When may I flare or vent gas?

(a) You must request and receive approval from the Regional Supervisor to flare or vent natural gas at your facility, except in the following situations:

Condition | Additional requirements

(1) When the gas is lease use gas (produced natural gas which is used on or for the benefit of lease operations such as gas used to operate production facilities) or is used as an additive necessary to burn waste products, such as H2S | The volume of gas flared or vented may not exceed the amount necessary for its intended purpose. Burning waste products may require approval under other regulations.

(2) During the restart of a facility that was shut in because of weather conditions, such as a hurricane | Flaring or venting may not exceed 48 cumulative hours without Regional Supervisor approval.

(3) During the blow down of transportation pipelines downstream of the royalty meter | (i) You must report the location, time, flare/vent volume, and reason for flaring/venting to the Regional Supervisor in writing within 72 hours after the incident is over. (ii) Additional approval may be required under subparts H and J of this part.

(4) During the unloading or cleaning of a well, drill-stem testing, production testing, other well-evaluation testing, or the necessary blow down to perform these procedures | You may not exceed 48 cumulative hours of flaring or venting per unloading or cleaning or testing operation on a single completion without Regional Supervisor approval.

(5) When properly working equipment yields flash gas (natural gas released from liquid hydrocarbons as a result of a decrease in pressure, an increase in temperature, or both) from storage vessels or other low-pressure production vessels, and you cannot economically recover this flash gas | You may not flare or vent more than an average of 50 MCF per day during any calendar month without Regional Supervisor approval.

(6) When the equipment works properly but there is a temporary upset condition, such as a hydrate or paraffin plug | (i) For oil-well gas and gas-well flash gas (natural gas released from condensate as a result of a decrease in pressure, an increase in temperature, or both), you may not exceed 48 continuous hours of flaring or venting without Regional Supervisor approval. (ii) For primary gas-well gas (natural gas from a gas well completion that is at or near its wellhead pressure; this does not include flash gas), you may not exceed 2 continuous hours of flaring or venting without Regional Supervisor approval. (iii) You may not exceed 144 cumulative hours of flaring or venting during a calendar month without Regional Supervisor approval.

(7) When equipment fails to work properly, during equipment maintenance and repair, or when you must relieve system pressures | (i) For oil-well gas and gas-well flash gas, you may not exceed 48 continuous hours of flaring or venting without Regional Supervisor approval. (ii) For primary gas-well gas, you may not exceed 2 continuous hours of flaring or venting without Regional Supervisor approval. (iii) You may not exceed 144 cumulative hours of flaring or venting during a calendar month without Regional Supervisor approval. (iv) The continuous and cumulative hours allowed under this paragraph may be counted separately from the hours under paragraph (a)(6) of this section.

(b) Regardless of the requirements in paragraph (a) of this section, you must not flare or vent gas over the volume approved in your Development Operations Coordination Document (DOCD) or your Development and Production Plan (DPP) submitted to BOEM.

(c) The Regional Supervisor may establish alternative approval procedures to cover situations when you cannot contact the BSEE office, such as during non-office hours.

(d) The Regional Supervisor may specify a volume limit, or a shorter time limit than specified elsewhere in this part, in order to prevent air quality degradation or loss of reserves.

(e) If you flare or vent gas without the required approval, or if the Regional Supervisor determines that you were negligent or could have avoided flaring or venting the gas, the hydrocarbons will be considered avoidably lost or wasted. You must pay royalties on the loss or waste, according to 30 CFR part 1202. You must value any gas or liquid hydrocarbons avoidably lost or wasted under the provisions of 30 CFR part 1206.

(f) Fugitive emissions from valves, fittings, flanges, pressure relief valves or similar components do not require approval under this subpart unless specifically required by the Regional Supervisor.

§ 250.1161 When may I flare or vent gas for extended periods of time?

You must request and receive approval from the Regional Supervisor to flare or vent gas for an extended period of time. The Regional Supervisor will specify the approved period of time, which will not exceed 1 year. The Regional Supervisor may deny your request if it does not ensure the conservation of natural resources or is not consistent with National interests relating to development and production of minerals of the OCS. The Regional Supervisor may approve your request for one of the following reasons:

(a) You initiated an action which, when completed, will eliminate flaring and venting; or

(b) You submit to the Regional Supervisor an evaluation supported by engineering, geologic, and economic data indicating that the oil and gas produced from the well(s) will not economically support the facilities necessary to sell the gas or to use the gas on or for the benefit of the lease.

§ 250.1162 When may I burn produced liquid hydrocarbons?

(a) You must request and receive approval from the Regional Supervisor to burn any produced liquid hydrocarbons. The Regional Supervisor may allow you to burn liquid hydrocarbons if you demonstrate that transporting them to market or re-injecting them is not technically feasible or poses a significant risk of harm to offshore personnel or the environment.

(b) If you burn liquid hydrocarbons without the required approval, or if the Regional Supervisor determines that you were negligent or could have avoided burning liquid hydrocarbons, the hydrocarbons will be considered avoidably lost or wasted. You must pay royalties on the loss or waste, according to 30 CFR part 1202. You must value any liquid hydrocarbons avoidably lost or wasted under the provisions of 30 CFR part 1206.

§ 250.1163 How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain?

(a) If your facility processes more than an average of 2,000 bopd during May 2010, you must install flare/vent meters within 180 days after May 2010. If your facility processes more than an average of 2,000 bopd during a calendar month after May 2010, you must install flare/vent meters within 120 days after the end of the month in which the average amount of oil processed exceeds 2,000 bopd.

(1) You must notify the Regional Supervisor when your facility begins to process more than an average of 2,000 bopd in a calendar month;

(2) The flare/vent meters must measure all flared and vented gas within 5 percent accuracy;

(3) You must calibrate the meters regularly, in accordance with the manufacturer's recommendation, or at least once every year, whichever is shorter; and

(4) You must use and maintain the flare/vent meters for the life of the facility.

(b) You must report all hydrocarbons produced from a well completion, including all gas flared, gas vented, and liquid hydrocarbons burned, to Office of Natural Resources Revenue on Form ONRR-4054 (Oil and Gas Operations Report), in accordance with 30 CFR 1210.102.

(1) You must report the amount of gas flared and the amount of gas vented separately.

(2) You may classify and report gas used to operate equipment on the lease, such as gas used to power engines, instrument gas, and gas used to maintain pilot lights, as lease use gas.

(3) If flare/vent meters are required at one or more of your facilities, you must report the amount of gas flared and vented at each of those facilities separately from those facilities that do not require meters and separately from other facilities with meters.

(4) If flare/vent meters are not required at your facility:

(i) You may report the gas flared and vented on a lease or unit basis. Gas flared and vented from multiple facilities on a single lease or unit may be reported together.

(ii) If you choose to install meters, you may report the gas volume flared and vented according to the method specified in paragraph (b)(3) of this section.

(c) You must prepare and maintain records detailing gas flaring, gas venting, and liquid hydrocarbon burning for each facility for 6 years.

(1) You must maintain these records on the facility for at least the first 2 years and have them available for inspection by BSEE representatives.

(2) After 2 years, you must maintain the records, allow BSEE representatives to inspect the records upon request and provide copies to the Regional Supervisor upon request, but are not required to keep them on the facility.

(3) The records must include, at a minimum:

(i) Daily volumes of gas flared, gas vented, and liquid hydrocarbons burned;

(ii) Number of hours of gas flaring, gas venting, and liquid hydrocarbon burning, on a daily and monthly cumulative basis;

(iii) A list of the wells contributing to gas flaring, gas venting, and liquid hydrocarbon burning, along with gas-oil ratio data;

(iv) Reasons for gas flaring, gas venting, and liquid hydrocarbon burning; and

(v) Documentation of all required approvals.

(d) If your facility is required to have flare/vent meters:

(1) You must maintain the meter recordings for 6 years.

(i) You must keep these recordings on the facility for 2 years and have them available for inspection by BSEE representatives.

(ii) After 2 years, you must maintain the recordings, allow BSEE representatives to inspect the recordings upon request and provide copies to the Regional Supervisor upon request, but are not required to keep them on the facility.

(iii) These recordings must include the begin times, end times, and volumes for all flaring and venting incidents.

(2) You must maintain flare/vent meter calibration and maintenance records on the facility for 2 years.

(e) If your flaring or venting of gas, or burning of liquid hydrocarbons, required written or oral approval, you must submit documentation to the Regional Supervisor summarizing the location, dates, number of hours, and volumes of gas flared, gas vented, and liquid hydrocarbons burned under the approval.

§ 250.1164 What are the requirements for flaring or venting gas containing H2S?

(a) You may not vent gas containing H2S, except for minor releases during maintenance and repair activities that do not result in a 15-minute time-weighted average atmosphere concentration of H2S of 20 ppm or higher anywhere on the platform.

(b) You may flare gas containing H2S only if you meet the requirements of §§ 250.1160, 250.1161, 250.1163, and the following additional requirements:

(1) For safety or air pollution prevention purposes, the Regional Supervisor may further restrict the flaring of gas containing H2S. The Regional Supervisor will use information provided in the lessee's H2S Contingency Plan (§ 250.490(f)), Exploration Plan, DPP, DOCD submitted to BOEM, and associated documents to determine the need for restrictions; and

(2) If the Regional Supervisor determines that flaring at a facility or group of facilities may significantly affect the air quality of an onshore area, the Regional Supervisor may require you to conduct an air quality modeling analysis, under 30 CFR 550.303, to determine the potential effect of facility emissions. The Regional Supervisor may require monitoring and reporting, or may restrict or prohibit flaring, under 30 CFR 550.303 and 30 CFR 550.304.

(c) The Regional Supervisor may require you to submit monthly reports of flared and vented gas containing H2S. Each report must contain, on a daily basis:

(1) The volume and duration of each flaring and venting occurrence;

(2) H2S concentration in the flared or vented gas; and

(3) The calculated amount of SO2 emitted.

120 Other Requirements
§ 250.1165 What must I do for enhanced recovery operations?

(a) You must promptly initiate enhanced oil and gas recovery operations for all reservoirs where these operations would result in an increase in ultimate recovery of oil or gas under sound engineering and economic principles.

(b) Before initiating enhanced recovery operations, you must submit a proposed plan to the BSEE Regional Supervisor and receive approval for pressure maintenance, secondary or tertiary recovery, cycling, and similar recovery operations intended to increase the ultimate recovery of oil and gas from a reservoir. The proposed plan must include, for each project reservoir, a geologic and engineering overview and any additional information required by the BSEE Regional Supervisor. You also must submit Form BOEM-0127 to BOEM along with the supporting data specified in BOEM regulations, 30 CFR part 550, subpart K.

(c) You must report to Office of Natural Resources Revenue the volumes of oil, gas, or other substances injected, produced, or produced for a second time under 30 CFR 1210.102.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1166 What additional reporting is required for developments in the Alaska OCS Region?

(a) For any development in the Alaska OCS Region, you must submit an annual reservoir management report to the Regional Supervisor. The report must contain information detailing the activities performed during the previous year and planned for the upcoming year that will:

(1) Provide for the prevention of waste;

(2) Provide for the protection of correlative rights; and

(3) Maximize ultimate recovery of oil and gas.

(b) If your development is jointly regulated by BSEE and the State of Alaska, BSEE and the Alaska Oil and Gas Conservation Commission will jointly determine appropriate reporting requirements to minimize or eliminate duplicate reporting requirements.

(c) [Reserved]

§ 250.1167 What information must I submit with forms and for approvals?

You must submit the supporting information listed in the following table with the form identified in column 1 and for the approvals required under this subpart identified in columns 2 through 4:

WPT BSEE-0126 (2 copies) | Gas cap production | Downhole commingling | Production within 500-ft of a unit or lease line

(a) Maps:

(1) Base map with surface, bottomhole, and completion locations with respect to the unit or lease line and the orientation of representative seismic lines or cross-sections | ✔ | ✔ | ✔

(2) Structure maps with penetration point and subsea depth for each well penetrating the reservoirs, highlighting subject wells; reservoir boundaries; and original and current fluid levels | ✔ | ✔ | ✔ | ✔

(3) Net sand isopach with total net sand penetrated for each well, identified at the penetration point | ✔ | ✔

(4) Net hydrocarbon isopach with net feet of pay for each well, identified at the penetration point | ✔ | ✔

(b) Seismic data:

(1) Representative seismic lines, including strike and dip lines that confirm the structure; indicate polarity | ✔ | ✔ | ✔

(2) Amplitude extraction of seismic horizon, if applicable | ✔ | ✔ | ✔

(c) Logs:

(1) Well log sections with tops and bottoms of the reservoir(s) and proposed or existing perforations | ✔ | ✔ | ✔ | ✔

(2) Structural cross-sections showing the subject well and nearby wells | ✔ | ✔ | *

(d) Engineering data:

(1) Estimated recoverable reserves for each well completion in the reservoir; total recoverable reserves for each reservoir; method of calculation; reservoir parameters used in volumetric and decline curve analysis | † | † | ✔

(2) Well schematics showing current and proposed conditions | ✔ | ✔ | ✔

(3) The drive mechanism of each reservoir | ✔ | ✔ | ✔

(4) Pressure data, by date, and whether they are estimated or measured | ✔ | ✔

(5) Production data and decline curve analysis indicative of the reservoir performance | ✔ | ✔

(6) Reservoir simulation with the reservoir parameters used, history matches, and prediction runs (include proposed development scenario) | * | * | *

(e) General information:

(1) Detailed economic analysis | * | *

(2) Reservoir name and whether or not it is competitive as defined under § 250.105 | ✔ | ✔ | ✔

(3) Operator name, lessee name(s), block, lease number, royalty rate, and unit number (if applicable) of all relevant leases | ✔ | ✔ | ✔

(4) Geologic overview of project | ✔ | ✔ | ✔

(5) Explanation of why the proposed completion scenario will maximize ultimate recovery | ✔ | ✔ | ✔

(6) List of all wells in subject reservoirs that have ever produced or been used for injection | ✔ | ✔ | ✔

✔ Required.

† Each Gas Cap Production request and Downhole Commingling request must include the estimated recoverable reserves for (1) the case where your proposed production scenario is approved, and (2) the case where your proposed production scenario is denied.

* Additional items the Regional Supervisor may request.

Note: All maps must be at a standard scale and show lease and unit lines. The Regional Supervisor may waive submittal of some of the required data on a case-by-case basis.

(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in § 250.125, according to the instructions in § 250.126.

Subpart L Oil and Gas Production Measurement, Surface Commingling, and Security
§ 250.1200 Question index table.

The table in this section lists questions concerning Oil and Gas Production Measurement, Surface Commingling, and Security.

Frequently asked questions | CFR citation

1. What are the requirements for measuring liquid hydrocarbons? | § 250.1202(a)

2. What are the requirements for liquid hydrocarbon royalty meters? | § 250.1202(b)

3. What are the requirements for run tickets? | § 250.1202(c)

4. What are the requirements for liquid hydrocarbon royalty meter provings? | § 250.1202(d)

5. What are the requirements for calibrating a master meter used in royalty meter provings? | § 250.1202(e)

6. What are the requirements for calibrating mechanical-displacement provers and tank provers? | § 250.1202(f)

7. What correction factors must a lessee use when proving meters with a mechanical displacement prover, tank prover, or master meter? | § 250.1202(g)

8. What are the requirements for establishing and applying operating meter factors for liquid hydrocarbons? | § 250.1202(h)

9. Under what circumstances does a liquid hydrocarbon royalty meter need to be taken out of service, and what must a lessee do? | § 250.1202(i)

10. How must a lessee correct gross liquid hydrocarbon volumes to standard conditions? | § 250.1202(j)

11. What are the requirements for liquid hydrocarbon allocation meters? | § 250.1202(k)

12. What are the requirements for royalty and inventory tank facilities? | § 250.1202(l)

13. To which meters do BSEE requirements for gas measurement apply? | § 250.1203(a)

14. What are the requirements for measuring gas? | § 250.1203(b)

15. What are the requirements for gas meter calibrations? | § 250.1203(c)

16. What must a lessee do if a gas meter is out of calibration or malfunctioning? | § 250.1203(d)

17. What are the requirements when natural gas from a Federal lease is transferred to a gas plant before royalty determination? | § 250.1203(e)

18. What are the requirements for measuring gas lost or used on a lease? | § 250.1203(f)

19. What are the requirements for the surface commingling of production? | § 250.1204(a)

20. What are the requirements for a periodic well test used for allocation? | § 250.1204(b)

21. What are the requirements for site security? | § 250.1205(a)

22. What are the requirements for using seals? | § 250.1205(b)

§ 250.1201 Definitions.

Terms not defined in this section have the meanings given in the applicable chapter of the API MPMS, which is incorporated by reference in § 250.198. Terms used in Subpart L have the following meaning:

Allocation meter—a meter used to determine the portion of hydrocarbons attributable to one or more platforms, leases, units, or wells, in relation to the total production from a royalty or allocation measurement point.

British Thermal Unit (Btu)—the amount of heat needed to raise the temperature of one pound of water from 59.5 degrees Fahrenheit (59.5 °F) to 60.5 degrees Fahrenheit (60.5 °F) at standard pressure base (14.73 pounds per square inch absolute (psia)).

Compositional Analysis—separating mixtures into identifiable components expressed in mole percent.

Force majeure event—an event beyond your control such as war, act of terrorism, crime, or act of nature which prevents you from operating the wells and meters on your OCS facility.

Gas lost—gas that is neither sold nor used on the lease or unit nor used internally by the producer.

Gas processing plant—an installation that uses any process designed to remove elements or compounds (hydrocarbon and non-hydrocarbon) from gas, including absorption, adsorption, or refrigeration. Processing does not include treatment operations, including those necessary to put gas into marketable conditions such as natural pressure reduction, mechanical separation, heating, cooling, dehydration, desulphurization, and compression. The changing of pressures or temperatures in a reservoir is not processing.

Gas processing plant statement—a monthly statement showing the volume and quality of the inlet or field gas stream and the plant products recovered during the period, volume of plant fuel, flare and shrinkage, and the allocation of these volumes to the sources of the inlet stream.

Gas royalty meter malfunction—an error in any component of the gas measurement system which exceeds contractual tolerances.

Gas volume statement—a monthly statement showing gas measurement data, including the volume (Mcf) and quality (Btu) of natural gas which flowed through a meter.

Inventory tank—a tank in which liquid hydrocarbons are stored prior to royalty measurement. The measured volumes are used in the allocation process.

Liquid hydrocarbons (free liquids)—hydrocarbons which exist in liquid form at standard conditions after passing through separating facilities.

Malfunction factor—a liquid hydrocarbon royalty meter factor that differs from the previous meter factor by an amount greater than 0.0025.

Natural gas—a highly compressible, highly expandable mixture of hydrocarbons which occurs naturally in a gaseous form and passes a meter in vapor phase.

Operating meter—a royalty or allocation meter that is used for gas or liquid hydrocarbon measurement for any period during a calibration cycle.

Pipeline (retrograde) condensate—liquid hydrocarbons which drop out of the separated gas stream at any point in a pipeline during transmission to shore.

Pressure base—the pressure at which gas volumes and quality are reported. The standard pressure base is 14.73 psia.

Prove—to determine (as in meter proving) the relationship between the volume passing through a meter at one set of conditions and the indicated volume at those same conditions.

Royalty meter—a meter approved for the purpose of determining the volume of gas, oil, or other components removed, saved, or sold from a Federal lease.

Royalty tank—an approved tank in which liquid hydrocarbons are measured and upon which royalty volumes are based.

Run ticket—the invoice for liquid hydrocarbons measured at a royalty point.

Sales meter—a meter at which custody transfer takes place (not necessarily a royalty meter).

Seal—a device or approved method used to prevent tampering with royalty measurement components.

Standard conditions—atmospheric pressure of 14.73 pounds per square inch absolute (psia) and 60 °F.

Surface commingling—the surface mixing of production from two or more leases and/or unit participating areas prior to royalty measurement.

Temperature base—the temperature at which gas and liquid hydrocarbon volumes and quality are reported. The standard temperature base is 60 °F.

Verification/Calibration—testing and correcting, if necessary, a measuring device to ensure compliance with industry accepted, manufacturer's recommended, or regulatory required standard of accuracy.

You or your—the lessee or the operator or other lessees' representative engaged in operations in the Outer Continental Shelf (OCS).

[76 FR 64462, Oct. 18, 2011, as amended at 91 FR 35360, June 10, 2026]

§ 250.1202 Liquid hydrocarbon measurement.

(a) What are the requirements for measuring liquid hydrocarbons? You must:

(1) Submit a written application to, and obtain approval from, the Regional Supervisor before commencing liquid hydrocarbon production, or making any changes to the previously-approved measurement and/or allocation procedures. Your application (which may also include any relevant gas measurement and surface commingling requests) must be accompanied by payment of the service fee listed in § 250.125. The service fees are divided into two levels based on complexity as shown in the following table.

Application type | Actions

(i) Simple applications, | Applications to temporarily reroute production (for a duration not to exceed six months); Production tests prior to pipeline construction; Departures related to meter proving, well testing, or sampling frequency.

(ii) Complex applications, | Creation of new facility measurement points (FMPs); Association of leases or units with existing FMPs; Inclusion of production from additional structures; Meter updates which add buy-back gas meters or pigging meters; Other applications which request deviations from the approved allocation procedures.

(2) Use measurement equipment and procedures that will accurately measure the liquid hydrocarbons produced from a lease or unit according to the following API publications unless otherwise approved by the Regional Supervisor:

(i) API MPMS Chapter 2, Section 2A (incorporated by reference, see § 250.198);

(ii) API MPMS Chapter 2, Section 2B (incorporated by reference, see § 250.198);

(iii) API MPMS Chapter 3.1A (incorporated by reference, see § 250.198);

(iv) API MPMS Chapter 3, Section 1B (incorporated by reference, see § 250.198);

(v) API MPMS Chapter 4, Section 1 (incorporated by reference, see § 250.198);

(vi) API MPMS Chapter 4, Section 2 (incorporated by reference, see § 250.198);

(vii) API MPMS Chapter 4, Section 4 (incorporated by reference, see § 250.198);

(viii) API MPMS Chapter 4.5 (incorporated by reference, see § 250.198);

(ix) API MPMS Chapter 4, Section 6 (incorporated by reference, see § 250.198).;

(x) API MPMS Chapter 4, Section 7 (incorporated by reference, see § 250.198);.

(xi) API MPMS Chapter 4.8 (incorporated by reference, see § 250.198);

(xii) API MPMS Chapter 4, Section 9, Part 2 (incorporated by reference, see § 250.198);

(xiii) API MPMS Chapter 5, Section 1 (incorporated by reference, see § 250.198);

(xiv) API MPMS Chapter 5, Section 2 (incorporated by reference, see § 250.198);

(xv) API MPMS Chapter 5, Section 3 (incorporated by reference, see § 250.198);

(xvi) API MPMS Chapter 5, Section 4 (incorporated by reference, see § 250.198);

(xvii) API MPMS Chapter 5, Section 5 (incorporated by reference, see § 250.198);

(xviii) API MPMS Chapter 5, Section 6 (incorporated by reference, see§ 250.198);

(xix) API MPMS Chapter 5.8 (incorporated by reference, see § 250.198);

(xx) API MPMS Chapter 6.1 (incorporated by reference, see § 250.198);

(xxi) API MPMS Chapter 6, Section 6 (incorporated by reference, see § 250.198);

(xxii) API MPMS Chapter 6, Section 7 (incorporated by reference, see § 250.198);

(xxiii) API MPMS Chapter 7.1 (incorporated by reference, see § 250.198);

(xxiv) API MPMS Chapter 7.3 (incorporated by reference, see § 250.198);

(xxv) API MPMS Chapter 8.1 (incorporated by reference, see § 250.198);

(xxvi) API MPMS Chapter 8.2 (incorporated by reference, see § 250.198);

(xxvii) API MPMS Chapter 8.3 (incorporated by reference, see § 250.198);

(xxviii) API MPMS Chapter 9.1 (incorporated by reference, see § 250.198);

(xxix) API MPMS Chapter 9.2 (incorporated by reference, see § 250.198);

(xxx) API MPMS Chapter 9.4 (incorporated by reference, see § 250.198);

(xxxi) API MPMS Chapter 10, Section 1 (incorporated by reference, see § 250.198);

(xxxii) API MPMS Chapter 10.2 (incorporated by reference, see § 250.198);

(xxxiii) API MPMS Chapter 10.3 (incorporated by reference, see § 250.198);

(xxxiv) API MPMS Chapter 10.4 (incorporated by reference, see § 250.198);

(xxxv) API MPMS Chapter 10.9 (incorporated by reference, see § 250.198);

(xxxvi) API MPMS Chapter 11, Section 1 (incorporated by reference, see § 250.198);

(xxxvii) API MPMS Chapter 12, Section 2, Part 4 (incorporated by reference, see § 250.198);

(xxxviii) API MPMS Chapter 12.2 (incorporated by reference, see § 250.198). You may temporarily continue to use API MPMS Chapter 12, Section 2, Part 1, API MPMS Chapter 12, Section 2, Part 2, and API MPMS Chapter 12, Section 2, Part 3 (incorporated by reference, see § 250.198) for flow computer systems at BSEE designated facility measurement points (FMP) in existence as of August 10, 2026. However, you must comply with API MPMS Chapter 12.2 at these FMPs commencing August 11, 2031 unless otherwise approved by the Regional Supervisor;

(xxxix) API MPMS Chapter 20, Section 1, excluding sections 1.16.1, 1.16.3, 1.16.3.1, 1.16.3.2, and 1.16.3.3, (incorporated by reference, see § 250.198);

(xl) API MPMS Chapter 21, Section 2 (incorporated by reference, see § 250.198);

(xli) API MPMS Chapter 21, Addendum to Section 2, Part 2 (incorporated by reference, see § 250.198);

(xlii) API Standard 2555 (incorporated by reference, see § 250.198);

(xliii) API Recommended Practice 2556 (incorporated by reference, see § 250.198); and

(xliv) API MPMS Chapter 11.1 (incorporated by reference, see § 250.198).

(3) Use procedures and correction factors according to the following API MPMS publications.

(i) API MPMS Chapter 4.8 (incorporated by reference, see § 250.198);

(ii) API MPMS Chapter 5, Section 6 (incorporated by reference, see § 250.198);

(iii) API MPMS Chapter 5.8 (incorporated by reference, see § 250.198);

(iv) API MPMS Chapter 11, Section 1 (incorporated by reference, see § 250.198);

(v) API MPMS Chapter 11.2.2 (incorporated by reference, see § 250.198);

(vi) API MPMS Chapter 11, Section 2, Part 2 (incorporated by reference, see § 250.198);

(vii) API MPMS Chapter 12, Section 2, Part 4 (incorporated by reference, see § 250.198); and

(viii) API MPMS Chapter 11.1 (incorporated by reference, see § 250.198).

(4) When requested by the Regional Supervisor, provide the pipeline (retrograde) condensate volumes as allocated to the individual leases or units.

(b) What are the requirements for liquid hydrocarbon royalty meters? You must:

(1) Ensure that the royalty meter facilities include the following approved components (or other BSEE-approved components) which must be compatible with their connected systems:

(i) A meter equipped with a nonreset totalizer;

(ii) A calibrated mechanical displacement (pipe) prover, master meter, or tank prover;

(iii) A proportional-to-flow sampling device pulsed by the meter output;

(iv) A temperature measurement or temperature compensation device; and

(v) A sediment and water monitor with a probe located upstream of the divert valve.

(2) Ensure that the royalty meter facilities accomplish the following:

(i) Prevent flow reversal through the meter;

(ii) Protect meters subjected to pressure pulsations or surges;

(iii) Prevent the meter from being subjected to shock pressures greater than the maximum working pressure; and

(iv) Prevent meter bypassing.

(3) Maintain royalty meter facilities to ensure the following:

(i) Meters operate within the gravity range specified by the manufacturer;

(ii) Meters operate within the manufacturer's specifications for maximum and minimum flow rate for linear accuracy; and

(iii) Meters are reproven when changes in metering conditions affect the meters' performance such as changes in pressure, temperature, density (water content), viscosity, pressure, and flow rate.

(4) Ensure that sampling devices conform to the following:

(i) The sampling point is in the flowstream immediately upstream or downstream of the meter or divert valve in accordance with API MPMS Chapter 8.2 (incorporated by reference, see § 250.198) unless otherwise approved by the Regional Supervisor;

(ii) The sample container is vapor-tight and includes a power mixing device to allow complete mixing of the sample before removal from the container; and

(iii) The sample probe is in the center half of the pipe diameter in a vertical run and is located at least three pipe diameters downstream of any pipe fitting within a region of turbulent flow. The sample probe can be located in a horizontal pipe if adequate stream conditioning such as power mixers or static mixers are installed upstream of the probe according to the manufacturer's instructions.

(c) What are the requirements for run tickets? You must:

(1) For royalty meters, ensure that the run tickets clearly identify all observed data, all correction factors not included in the meter factor, and the net standard volume.

(2) For royalty tanks, ensure that the run tickets clearly identify all observed data, all applicable correction factors, on/off seal numbers, and the net standard volume.

(3) Pull a run ticket at the beginning of the month and immediately after establishing the monthly meter factor or a malfunction meter factor.

(4) Send all run tickets for royalty meters and tanks to the Regional Supervisor within 15 days after the end of the month;

(d) What are the requirements for liquid hydrocarbon royalty meter provings? You must:

(1) Permit BSEE representatives to witness provings;

(2) Ensure that the integrity of the prover calibration is traceable to test measures certified by the National Institute of Standards and Technology;

(3) Prove each operating royalty meter to determine the meter factor monthly, but the time between meter factor determinations must not exceed 42 days. When a force majeure event precludes the required monthly meter proving, meters must be proved within 15 days after being returned to service. The meters must be proved monthly thereafter, but the time between meter factor determinations must not exceed 42 days;

(4) Obtain approval from the Regional Supervisor before proving on a schedule other than monthly; and

(5) Submit copies of all meter proving reports for royalty meters to the Regional Supervisor monthly within 15 days after the end of the month.

(e) What are the requirements for calibrating a master meter used in royalty meter provings? You must:

(1) Calibrate the master meter to obtain a master meter factor before using it to determine operating meter factors;

(2) Use a fluid of similar gravity, viscosity, temperature, and flow rate as the liquid hydrocarbons that flow through the operating meter to calibrate the master meter;

(3) Calibrate the master meter monthly, but the time between calibrations must not exceed 42 days;

(4) Calibrate the master meter by recording runs until the results of two consecutive runs (if a tank prover is used) or five out of six consecutive runs (if a mechanical-displacement prover is used) produce meter factor differences of no greater than 0.0002. Lessees must use the average of the two (or the five) runs that produced acceptable results to compute the master meter factor;

(5) Install the master meter upstream of any back-pressure or reverse flow check valves associated with the operating meter. However, the master meter may be installed either upstream or downstream of the operating meter; and

(6) Keep a copy of the master meter calibration report at your field location for 2 years.

(f) What are the requirements for calibrating mechanical-displacement provers and tank provers? You must:

(1) Calibrate mechanical-displacement provers and tank provers at least once every 5 years according to the following API MPMS publications:

(i) API MPMS Chapter 4, Section 4 (incorporated by reference, see § 250.198);

(ii) API MPMS Chapter 4.8 (incorporated by reference, see § 250.198); and

(iii) API MPMS Chapter 12, Section 2, Part 4 (incorporated by reference, see § 250.198).

(2) Submit a copy of each calibration report to the Regional Supervisor within 15 days after the calibration.

(g) What correction factors must I use when proving meters with a mechanical-displacement prover, tank prover, or master meter? Calculate the correction factors using the following API MPMS publications (incorporated by reference, see § 250.198):

(1) API MPMS Chapter 4.8 (incorporated by reference, see § 250.198);

(2) API MPMS Chapter 11, Section 1 (incorporated by reference, see § 250.198);

(3) API MPMS Chapter 12, Section 2, Part 3 (incorporated by reference, see § 250.198); and

(4) API MPMS Chapter 12, Section 2, Part 4 (incorporated by reference, see § 250.198).

(h) What are the requirements for establishing and applying operating meter factors for liquid hydrocarbons? (1) If you use a mechanical-displacement prover, you must record proof runs until five out of six consecutive runs produce a difference between individual runs of no greater than .05 percent. You must use the average of the five accepted runs to compute the meter factor.

(2) If you use a master meter, you must record proof runs until three consecutive runs produce a total meter factor difference of no greater than 0.0005. The flow rate through the meters during the proving must be within 10 percent of the rate at which the line meter will operate. The final meter factor is determined by averaging the meter factors of the three runs;

(3) If you use a tank prover, you must record proof runs until two consecutive runs produce a meter factor difference of no greater than .0005. The final meter factor is determined by averaging the meter factors of the two runs; and

(4) You must apply operating meter factors forward starting with the date of the proving.

(5) Proving systems that employ the dual chronometry method of pulse interpolation must be compliant with API MPMS Chapter 4, Section 6 (incorporated by reference, see § 250.198) unless otherwise approved by the Regional Supervisor.

(i) Under what circumstances does a liquid hydrocarbon royalty meter need to be taken out of service, and what must I do? (1) If the difference between the meter factor and the previous factor exceeds 0.0025 it is a malfunction factor, and you must:

(i) Remove the meter from service and inspect it for damage or wear;

(ii) Adjust or repair the meter, and reprove it;

(iii) Apply the average of the malfunction factor and the previous factor to the production measured through the meter between the date of the previous factor and the date of the malfunction factor; and

(iv) Indicate that a meter malfunction occurred and show all appropriate remarks regarding subsequent repairs or adjustments on the proving report.

(2) If a meter fails to register production, you must:

(i) Remove the meter from service, repair and reprove it;

(ii) Apply the previous meter factor to the production run between the date of that factor and the date of the failure; and

(iii) Estimate and report unregistered production on the run ticket.

(3) If the results of a royalty meter proving exceed the run tolerance criteria and all measures excluding the adjustment or repair of the meter cannot bring results within tolerance, you must:

(i) Establish a factor using proving results made before any adjustment or repair of the meter; and

(ii) Treat the established factor like a malfunction factor (see paragraph (i)(1) of this section).

(j) How must I correct gross liquid hydrocarbon volumes to standard conditions? To correct gross liquid hydrocarbon volumes to standard conditions, you must:

(1) Include Cpl factors in the meter factor calculation or list and apply them on the appropriate run ticket.

(2) List Ctl factors on the appropriate run ticket when the meter is not automatically temperature compensated.

(k) What are the requirements for liquid hydrocarbon allocation meters? For liquid hydrocarbon allocation meters you must:

(1) Take samples continuously proportional to flow, or daily, using the procedures in API MPMS Chapter 8.1 or API MPMS Chapter 8.2 (both incorporated by reference, see § 250.198).

(2) For turbine meters, take the sample proportional to the flow only;

(3) Prove operating allocation meters monthly if they measure 50 or more barrels per day per meter the previous month. When a force majeure event precludes the required monthly meter proving, meters must be proved within 15 days after being returned to service. The meters must be proved monthly thereafter; or

(4) Prove operating allocation meters quarterly if they measure less than 50 barrels per day per meter the previous month. When a force majeure event precludes the required quarterly meter proving, meters must be proved within 15 days after being returned to service. The meters must be proved quarterly thereafter;

(5) Keep a copy of the proving reports at the field location for 2 years;

(6) Adjust and reprove the meter if the meter factor differs from the previous meter factor by more than 2 percent and less than 7 percent;

(7) For turbine meters, remove from service, inspect and reprove the meter if the factor differs from the previous meter factor by more than 2 percent and less than 7 percent;

(8) Repair and reprove, or replace and prove the meter if the meter factor differs from the previous meter factor by 7 percent or more; and

(9) Permit BSEE representatives to witness provings.

(l) What are the requirements for royalty and inventory tank facilities? You must:

(1) Equip each royalty and inventory tank with a vapor-tight thief hatch, a vent-line valve, and a fill line designed to minimize free fall and splashing;

(2) For royalty tanks, submit a complete set of calibration charts (tank tables) to the Regional Supervisor before using the tanks for royalty measurement;

(3) For inventory tanks, retain the calibration charts for as long as the tanks are in use and submit them to the Regional Supervisor upon request; and

(4) Obtain the volume and other measurement parameters by using corrections factors and procedures in the following API MPMS publications (all incorporated by reference, see § 250.198):

(i) API MPMS Chapter 2, Section 2A;

(ii) API MPMS Chapter 2, Section 2B;

(iii) API MPMS Chapter 3.1A;

(iv) API MPMS Chapter 3, Section 1B; and

(v) API MPMS Chapter 11, Section 1.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 18921, Mar. 29, 2012; 91 FR 35360, June 10, 2026]

§ 250.1203 Gas measurement.

(a) To which meters do BSEE requirements for gas measurement apply? BSEE requirements for gas measurements apply to all OCS gas royalty and allocation meters.

(b) What are the requirements for measuring gas? You must:

(1) Submit a written application to, and obtain approval from, the Regional Supervisor before commencing gas production, or making any changes to the previously-approved measurement and/or allocation procedures. Your application (which may also include any relevant liquid hydrocarbon measurement and surface commingling requests) must be accompanied by payment of the service fee listed in § 250.125. The service fees are divided into two levels based on complexity, see table in § 250.1202(a)(1).

(2) Design, install, use, maintain, and test measurement equipment and procedures to ensure accurate and verifiable measurement. You must follow the recommendations in the following API MPMS, GPA, and AGA publications unless otherwise approved by the Regional Supervisor:

(i) AGA Report No. 7 (incorporated by reference, see § 250.198);

(ii) AGA Report No. 8, Part 1 (incorporated by reference, see § 250.198);

(iii) AGA Report No. 8, Part 2 (incorporated by reference, see § 250.198);

(iv) AGA Report No. 9 (incorporated by reference, see § 250.198);

(v) AGA Report No. 10 (incorporated by reference, see § 250.198);

(vi) AGA Report No. 11 (incorporated by reference, see § 250.198);

(vii) GPA Standard 2198-16 (incorporated by reference, see § 250.198);

(viii) GPA Standard 2261-20 (incorporated by reference, see § 250.198);

(ix) GPA Standard 2286-14 (incorporated by reference, see § 250.198);

(x) API MPMS Chapter 14.1 (incorporated by reference, see § 250.198);

(xi) API MPMS Chapter 14.3.1 (incorporated by reference, see § 250.198);

(xii) API MPMS Chapter 14.3.2 (incorporated by reference, see § 250.198);

(xiii) API MPMS Chapter 14.3.3 (incorporated by reference, see § 250.198);

(xiv) API MPMS Chapter 14.5/GPA Standard 2172-09 (incorporated by reference, see § 250.198);

(xv) API MPMS Chapter 14, Section 8 (incorporated by reference, see § 250.198);

(xvi) API MPMS Chapter 20, Section 1, excluding sections 1.16.1, 1.16.3, 1.16.3.1, 1.16.3.2, and 1.16.3.3, (incorporated by reference, see § 250.198);

(xvii) API MPMS Chapter 20.3 (incorporated by reference, see § 250.198); and

(xviii) API MPMS Chapter 21, Section 1 (incorporated by reference, see § 250.198).

(3) Ensure that the measurement components demonstrate consistent levels of accuracy throughout the system.

(4) Equip the meter with a chart or electronic data recorder. If an electronic data recorder is used, you must follow the recommendations in API MPMS Chapter 21, Section 1 (incorporated by reference, see § 250.198).

(5) Take proportional-to-flow or spot samples upstream or downstream of the meter at least once every 6 months.

(6) When requested by the Regional Supervisor, provide available information on the gas quality.

(7) Ensure that standard conditions for reporting gross heating value (Btu) are at a base temperature of 60 °F and at a base pressure of 14.73 psia and reflect the same degree of water saturation as in the gas volume.

(8) When requested by the Regional Supervisor, submit copies of gas volume statements for each requested gas meter. Show whether gas volumes and gross Btu heating values are reported at saturated or unsaturated conditions; and

(9) When requested by the Regional Supervisor, provide volume and quality statements on dispositions other than those on the gas volume statement.

(c) What are the requirements for gas meter calibrations? You must:

(1) Verify/calibrate operating meters monthly, but do not exceed 42 days between verifications/calibrations. When a force majeure event precludes the required monthly meter verification/calibration, meters must be verified/calibrated within 15 days after being returned to service. The meters must be verified/calibrated monthly thereafter, but do not exceed 42 days between meter verifications/calibrations;

(2) Calibrate each meter by using the manufacturer's specifications;

(3) Conduct calibrations as close as possible to the average hourly rate of flow since the last calibration;

(4) Retain calibration reports at the field location for 2 years, and send the reports to the Regional Supervisor upon request; and

(5) Permit BSEE representatives to witness calibrations.

(d) What must I do if a gas meter is out of calibration or malfunctioning? If a gas meter is out of calibration or malfunctioning, you must:

(1) If the readings are greater than the contractual tolerances, adjust the meter to function properly or remove it from service and replace it.

(2) Correct the volumes to the last acceptable calibration as follows:

(i) If the duration of the error can be determined, calculate the volume adjustment for that period.

(ii) If the duration of the error cannot be determined, apply the volume adjustment to one-half of the time elapsed since the last calibration or 21 days, whichever is less.

(e) What are the requirements when natural gas from a Federal lease on the OCS is transferred to a gas plant before royalty determination? If natural gas from a Federal lease on the OCS is transferred to a gas plant before royalty determination:

(1) You must provide the following to the Regional Supervisor upon request:

(i) A copy of the monthly gas processing plant allocation statement; and

(ii) Gross heating values of the inlet and residue streams when not reported on the gas plant statement.

(2) You must permit BSEE to inspect the measurement and sampling equipment of natural gas processing plants that process Federal production.

(f) What are the requirements for measuring gas lost or used on a lease? (1) You must either measure or estimate the volume of gas lost or used on a lease.

(2) If you measure the volume, document the measurement equipment used and include the volume measured.

(3) If you estimate the volume, document the estimating method, the data used, and the volumes estimated.

(4) You must keep the documentation, including the volume data, easily obtainable for inspection at the field location for at least 2 years, and must retain the documentation at a location of your choosing for at least 7 years after the documentation is generated, subject to all other document retention and production requirements in 30 U.S.C. 1713 and 30 CFR part 1212.

(5) Upon the request of the Regional Supervisor, you must provide copies of the records.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 18922, Mar. 29, 2012; 85 FR 84237, Dec. 28, 2020; 91 FR 35361, June 10, 2026]

§ 250.1204 Surface commingling.

(a) What are the requirements for the surface commingling of production? You must:

(1) Submit a written application to, and obtain approval from, the Regional Supervisor before commencing the commingling of production or making any changes to the previously approved commingling procedures. Your application (which may also include any relevant liquid hydrocarbon and gas measurement requests) must be accompanied by payment of the service fee listed in § 250.125. The service fees are divided into two levels based on complexity, see table in § 250.1202(a)(1).

(2) Upon the request of the Regional Supervisor, lessees who deliver State lease production into a Federal commingling system must provide volumetric or fractional analysis data on the State lease production through the designated system operator.

(b) What are the requirements for a periodic well test used for allocation? You must:

(1) Conduct a well test at least once every 60 days (unless otherwise approved by the Regional Supervisor) in accordance with the recommendations and guidelines provided in API MPMS Chapter 20.5 (incorporated by reference, see § 250.198). When a force majeure event precludes the required well test within the prescribed 60 day period (or other frequency approved by the Regional Supervisor), wells must be tested within 15 days after being returned to production. Thereafter, well tests must be conducted at least once every 60 days (or other frequency approved by the Regional Supervisor);

(2) Follow the well test procedures in 30 CFR part 250, subpart K; and

(3) Retain the well test data at the field location for 2 years.

[76 FR 64462, Oct. 18, 2011, as amended at 91 FR 35361, June 10, 2026]

§ 250.1205 Site security.

(a) What are the requirements for site security? You must:

(1) Protect Federal production against production loss or theft;

(2) Post a sign at each royalty or inventory tank which is used in the royalty determination process. The sign must contain the name of the facility operator, the size of the tank, and the tank number;

(3) Not bypass BSEE-approved liquid hydrocarbon royalty meters and tanks; and

(4) Report the following to the Regional Supervisor as soon as possible, but no later than the next business day after discovery:

(i) Theft or mishandling of production;

(ii) Tampering or bypassing any component of the royalty measurement facility; and

(iii) Falsifying production measurements.

(b) What are the requirements for using seals? You must:

(1) Seal the following components of liquid hydrocarbon royalty meter installations to ensure that tampering cannot occur without destroying the seal:

(i) Meter component connections from the base of the meter up to and including the register;

(ii) Sampling systems including packing device, fittings, sight glass, and container lid;

(iii) Temperature and gravity compensation device components;

(iv) All valves on lines leaving a royalty or inventory storage tank, including load-out line valves, drain-line valves, and connection-line valves between royalty and non-royalty tanks; and

(v) Any additional components required by the Regional Supervisor.

(2) Seal all bypass valves of gas royalty and allocation meters.

(3) Number and track the seals and keep the records at the field location for at least 2 years; and

(4) Make the records of seals available for BSEE inspection.

Subpart M Unitization
§ 250.1300 What is the purpose of this subpart?

This subpart explains how Outer Continental Shelf (OCS) leases are unitized. If you are an OCS lessee, use the regulations in this subpart for both competitive reservoir and unitization situations. The purpose of joint development and unitization is to:

(a) Conserve natural resources;

(b) Prevent waste; and/or

(c) Protect correlative rights, including Federal royalty interests.

§ 250.1301 What are the requirements for unitization?

(a) Voluntary unitization. You and other OCS lessees may ask the Regional Supervisor to approve a request for voluntary unitization. The Regional Supervisor may approve the request for voluntary unitization if unitized operations:

(1) Promote and expedite exploration and development; or

(2) Prevent waste, conserve natural resources, or protect correlative rights, including Federal royalty interests, of a reasonably delineated and productive reservoir.

(b) Compulsory unitization. The Regional Supervisor may require you and other lessees to unitize operations of a reasonably delineated and productive reservoir if unitized operations are necessary to:

(1) Prevent waste;

(2) Conserve natural resources; or

(3) Protect correlative rights, including Federal royalty interests.

(c) Unit area. The area that a unit includes is the minimum number of leases that will allow the lessees to minimize the number of platforms, facility installations, and wells necessary for efficient exploration, development, and production of mineral deposits, oil and gas reservoirs, or potential hydrocarbon accumulations common to two or more leases. A unit may include whole leases or portions of leases.

(d) Unit agreement. You, the other lessees, and the unit operator must enter into a unit agreement. The unit agreement must: allocate benefits to unitized leases, designate a unit operator, and specify the effective date of the unit agreement. The unit agreement must terminate when: the unit no longer produces unitized substances, and the unit operator no longer conducts drilling or well-workover operations (§ 250.180) under the unit agreement, unless the Regional Supervisor orders or approves a suspension of production under § 250.170.

(e) Unit operating agreement. The unit operator and the owners of working interests in the unitized leases must enter into a unit operating agreement. The unit operating agreement must describe how all the unit participants will apportion all costs and liabilities incurred maintaining or conducting operations. When a unit involves one or more net-profit-share leases, the unit operating agreement must describe how to attribute costs and credits to the net-profit-share lease(s), and this part of the agreement must be approved by the Regional Supervisor. Otherwise, you must provide a copy of the unit operating agreement to the Regional Supervisor, but the Regional Supervisor does not need to approve the unit operating agreement.

(f) Extension of a lease covered by unit operations. If your unit agreement expires or terminates, or the unit area adjusts so that no part of your lease remains within the unit boundaries, your lease expires unless:

(1) Its initial term has not expired;

(2) You conduct drilling, production, or well-reworking operations on your lease consistent with applicable regulations; or

(3) BSEE orders or approves a suspension of production or operations for your lease.

(g) Unit operations. If your lease, or any part of your lease, is subject to a unit agreement, the entire lease continues for the term provided in the lease, and as long thereafter as any portion of your lease remains part of the unit area, and as long as operations continue the unit in effect.

(1) If you drill, produce or perform well-workover operations on a lease within a unit, each lease, or part of a lease, in the unit will remain active in accordance with the unit agreement. Following a discovery, if your unit ceases drilling activities for a reasonable time period between the delineation of one or more reservoirs and the initiation of actual development drilling or production operations and that time period would extend beyond your lease's primary term or any extension under § 250.180, the unit operator must request and obtain BSEE approval of a suspension of production under § 250.170 in order to keep the unit from terminating.

(2) When a lease in a unit agreement is beyond the primary term and the lease or unit is not producing, the lease will expire unless:

(i) You conduct a continuous drilling or well reworking program designed to develop or restore the lease or unit production; or

(ii) BSEE orders or approves a suspension of operations under § 250.170.

§ 250.1302 What if I have a competitive reservoir on a lease?

(a) The Regional Supervisor may require you to conduct development and production operations in a competitive reservoir under either a joint Competitive Reservoir Development Program submitted to BSEE or a unitization agreement. A competitive reservoir has one or more producing or producible well completions on each of two or more leases, or portions of leases, with different lease operating interests. For purposes of this paragraph, a producible well completion is a well which is capable of production and which is shut in at the well head or at the surface but not necessarily connected to production facilities and from which the operator plans future production.

(b) You may request that the Regional Supervisor make a preliminary determination whether a reservoir is competitive. When you receive the preliminary determination, you have 30 days (or longer if the Regional Supervisor allows additional time) to concur or to submit an objection with supporting evidence if you do not concur. The Regional Supervisor will make a final determination and notify you and the other lessees.

(c) If you conduct drilling or production operations in a reservoir determined competitive by the BSEE Regional Supervisor, you and the other affected lessees must submit for approval a joint Competitive Reservoir Development Program. You must submit the joint Competitive Reservoir Development Program within 90 days after the Regional Supervisor makes a final determination that the reservoir is competitive. The joint Competitive Reservoir Development Program must provide for the development and/or production of the reservoir. You may submit supplemental Competitive Reservoir Development Programs for the Regional Supervisor's approval.

(d) If you and the other affected lessees cannot reach an agreement on a joint Competitive Reservoir Development Program, submitted to BSEE within the approved period of time, each lessee must submit a separate Competitive Reservoir Development Program to the Regional Supervisor. The Regional Supervisor will hold a hearing to resolve differences in the separate Competitive Reservoir Development Programs. If the differences in the separate programs are not resolved at the hearing and the Regional Supervisor determines that unitization is necessary under § 250.1301(b), BSEE will initiate unitization under § 250.1304.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1303 How do I apply for voluntary unitization?

(a) You must file a request for a voluntary unit with the Regional Supervisor. Your request must include:

(1) A draft of the proposed unit agreement;

(2) A proposed initial plan of operation;

(3) Supporting geological, geophysical, and engineering data; and

(4) Other information that may be necessary to show that the unitization proposal meets the criteria of § 250.1300.

(b) The unit agreement must comply with the requirements of this part. BSEE will maintain and provide a model unit agreement for you to follow. If BSEE revises the model, BSEE will publish the revised model in the Federal Register. If you vary your unit agreement from the model agreement, you must obtain the approval of the Regional Supervisor.

(c) After the Regional Supervisor accepts your unitization proposal, you, the other lessees, and the unit operator must sign and file copies of the unit agreement, the unit operating agreement, and the initial plan of operation with the Regional Supervisor for approval.

(d) You must pay the service fee listed in § 250.125 of this part with your request for a voluntary unitization proposal or the expansion of a previously approved voluntary unit to include additional acreage. Additionally, you must pay the service fee listed in § 250.125 with your request for unitization revision.

§ 250.1304 How will BSEE require unitization?

(a) If the Regional Supervisor determines that unitization of operations within a proposed unit area is necessary to prevent waste, conserve natural resources of the OCS, or protect correlative rights, including Federal royalty interests, the Regional Supervisor may require unitization.

(b) If you ask BSEE to require unitization, you must file a request with the Regional Supervisor. You must include a proposed unit agreement as described in §§ 250.1301(d) and 250.1303(b); a proposed unit operating agreement; a proposed initial plan of operation; supporting geological, geophysical, and engineering data; and any other information that may be necessary to show that unitization meets the criteria of § 250.1300. The proposed unit agreement must include a counterpart executed by each lessee seeking compulsory unitization. Lessees who seek compulsory unitization must simultaneously serve on the nonconsenting lessees copies of:

(1) The request;

(2) The proposed unit agreement with executed counterparts;

(3) The proposed unit operating agreement; and

(4) The proposed initial plan of operation.

(c) If the Regional Supervisor initiates compulsory unitization, BSEE will serve all lessees of the proposed unit area with a proposed unitization plan and a statement of reasons for the proposed unitization.

(d) The Regional Supervisor will not require unitization until BSEE provides all lessees of the proposed unit area written notice and an opportunity for a hearing. If you want BSEE to hold a hearing, you must request it within 30 days after you receive written notice from the Regional Supervisor or after you are served with a request for compulsory unitization from another lessee.

(e) BSEE will not hold a hearing under this paragraph until at least 30 days after BSEE provides written notice of the hearing date to all parties owning interests that would be made subject to the unit agreement. The Regional Supervisor must give all lessees of the proposed unit area an opportunity to submit views orally and in writing and to question both those seeking and those opposing compulsory unitization. Adjudicatory procedures are not required. The Regional Supervisor will make a decision based upon a record of the hearing, including any written information made a part of the record. The Regional Supervisor will arrange for a court reporter to make a verbatim transcript. The party seeking compulsory unitization must pay for the court reporter and pay for and provide to the Regional Supervisor within 10 days after the hearing three copies of the verbatim transcript.

(f) The Regional Supervisor will issue an order that requires or rejects compulsory unitization. That order must include a statement of reasons for the action taken and identify those parts of the record which form the basis of the decision. Any adversely affected party may appeal the final order of the Regional Supervisor under 30 CFR part 290.

Subpart N Outer Continental Shelf Civil Penalties
121 Outer Continental Shelf Lands Act Civil Penalties
§ 250.1400 How does BSEE begin the civil penalty process?

This subpart explains BSEEs civil penalty procedures whenever a lessee, operator or other person engaged in oil, gas, sulphur or other minerals operations in the OCS has a violation. Whenever BSEE determines, on the basis of available evidence, that a violation occurred and a civil penalty review is appropriate, it will prepare a case file. BSEE will appoint a Reviewing Officer.

§ 250.1401 [Reserved]
§ 250.1402 Definitions.

Terms used in this subpart have the following meaning:

Case file means a BSEE document file containing information and the record of evidence related to the alleged violation.

Civil penalty means a fine. It is a BSEE regulatory enforcement tool used in addition to Notices of Incidents of Noncompliance and directed suspensions of production or other operations.

Reviewing Officer means a BSEE employee assigned to review case files and assess civil penalties.

Violation means failure to comply with the Outer Continental Shelf Lands Act (OCSLA) or any other applicable laws, with any regulations issued under the OCSLA, or with the terms or provisions of leases, licenses, permits, rights-of-way, or other approvals issued under the OCSLA.

Violator means a person responsible for a violation.

§ 250.1403 What is the maximum civil penalty?

The maximum civil penalty is $55,764 per day per violation.

[90 FR 44149, Sept. 12, 2025]

§ 250.1404 Which violations will BSEE review for potential civil penalties?

BSEE will review each of the following violations for potential civil penalties:

(a) Violations that you do not correct within the period BSEE grants;

(b) Violations that BSEE determines may constitute, or constituted, a threat of serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, any mineral deposit, or the marine, coastal, or human environment; or

(c) Violations that cause serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, any mineral deposit, or the marine, coastal, or human environment.

(d) Violations of the oil spill financial responsibility requirements at 30 CFR part 553.

§ 250.1405 When is a case file developed?

BSEE will develop a case file during its investigation of the violation, and forward it to a Reviewing Officer if any of the conditions in § 250.1404 exist. The Reviewing Officer will review the case file and determine if a civil penalty is appropriate. The Reviewing Officer may administer oaths and issue subpoenas requiring witnesses to attend meetings, submit depositions, or produce evidence.

§ 250.1406 When will BSEE notify me and provide penalty information?

If the Reviewing Officer determines that a civil penalty should be assessed, the Reviewing Officer will send the violator a letter of notification. The letter of notification will include:

(a) The amount of the proposed civil penalty;

(b) Information on the violation(s); and

(c) Instruction on how to obtain a copy of the case file, schedule a meeting, submit information, or pay the penalty.

§ 250.1407 How do I respond to the letter of notification?

You have 30 calendar days after you receive the Reviewing Officer's letter to either:

(a) Request, in writing, a meeting with the Reviewing Officer;

(b) Submit additional information; or

(c) Pay the proposed civil penalty.

§ 250.1408 When will I be notified of the Reviewing Officer's decision?

At the end of the 30 calendar days or after the meeting and submittal of additional information, the Reviewing Officer will review the case file, including all information you submitted, and send you a decision. The decision will include the amount of any final civil penalty, the basis for the civil penalty, and instructions for paying or appealing the civil penalty.

§ 250.1409 What are my appeal rights?

(a) When you receive the Reviewing Officer's final decision, you have 60 days to either pay the penalty or file an appeal in accordance with 30 CFR part 290, subpart A.

(b) In order to file an appeal, you must perform one of the following actions within the 60-day appeal period to have your appeal heard:

(1) Submit a surety bond in the amount of the penalty to the appropriate Leasing Office in the Region where the penalty was assessed, following instructions that the Reviewing Officer will include in the final decision; or

(2) Notify the appropriate Leasing Office, in the Region where the penalty was assessed, that you want your lease-specific/area-wide bond on file to be used as the bond for the penalty amount.

(c) If you choose the alternative in paragraph (b)(2) of this section, the BOEM Regional Director may require additional security (i.e., security in excess of your existing bond) to ensure sufficient coverage during an appeal. In that event, the Regional Director will require you to post the supplemental bond with the regional office in the same manner as under 30 CFR 556.53(d) through (f). If the Regional Director determines the appeal should be covered by a lease-specific abandonment account then you must establish an account that meets the requirements of 30 CFR part 556.56.

(d) Satisfying the bonding requirement in paragraph (b) of this section is a jurisdictional precondition for a civil penalty appeal. If you have timely filed a request with BOEM pursuant to paragraph (b)(2) of this section to use your lease-specific/area-wide bond on file as the bond for the penalty amount, the IBLA's jurisdiction over the appeal is preserved while BOEM's decision on your request is pending. Should BOEM deny your request or require additional security pursuant to paragraph (c) of this section, you have 30 days to satisfy paragraph (b)(1) of this section or post the required additional security, as applicable, and jurisdiction is preserved during that 30-day period. If you fail to satisfy these bonding requirements, the IBLA will lose jurisdiction and must dismiss your appeal.

(e) If you do not either pay the penalty or fully satisfy the appeal requirements, the Department may take one or more of the following actions:

(1) Collect the amount you were assessed, plus interest, late payment charges, and other fees as provided by law, from the date you received the Reviewing Officer's final decision until the date we receive payment;

(2) Initiate additional enforcement, including, if appropriate, cancellation of the lease, right-of-way, license, permit, or approval, or the forfeiture of a bond under this part; or

(3) Bar you from doing further business with the Federal Government according to Executive Orders 12549 and 12689, and section 2455 of the Federal Acquisition Streamlining Act of 1994, 31 U.S.C. 6101. The Department of the Interior's regulations implementing these authorities are found at 43 CFR part 12, subpart D.

[76 FR 64462, Oct. 18, 2011, as amended at 89 FR 89925, Nov. 14, 2024; 90 FR 34596, July 23, 2025]

122 Federal Oil and Gas Royalty Management Act Civil Penalties Definitions
§ 250.1450 What definitions apply to this subpart?

The terms used in this subpart have the same meaning as in 30 U.S.C. 1702.

123 Penalties After a Period To Correct
§ 250.1451 What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease?

(a) If we believe that you have not followed any requirement of a statute, regulation, order, or lease term for any Federal oil or gas lease, we may send you a Notice of Noncompliance informing you what the violation is and what you need to do to correct it to avoid civil penalties under 30 U.S.C. 1719(a) and (b).

(b) We will serve the Notice of Noncompliance by registered mail or personal service using the most current address on file as maintained by the BOEM Leasing Office in your respective Region.

§ 250.1452 What if I correct the violation?

The matter will be closed if you correct all of the violations identified in the Notice of Noncompliance within 20 days after you receive the Notice (or within a longer time period specified in the Notice).

§ 250.1453 What if I do not correct the violation?

(a) We may send you a Notice of Civil Penalty if you do not correct all of the violations identified in the Notice of Noncompliance within 20 days after you receive the Notice of Noncompliance (or within a longer time period specified in that Notice). The Notice of Civil Penalty will tell you how much penalty you must pay for each day, beginning with the date of the Notice of Noncompliance, for each violation identified in the Notice of Noncompliance for as long as you do not correct the violation. The maximum civil penalty amount for each day of such an uncorrected violation is as specified in 30 CFR 1241.52(a)(2).

(b) If you do not correct all of the violations identified in the Notice of Noncompliance within 40 days after you receive the Notice of Noncompliance (or 20 days following the expiration of a longer time period specified in that Notice), we may increase the penalty for each day, beginning with the date of the Notice of Noncompliance, for each violation for as long as you do not correct the violations. The maximum civil penalty amount for each day of such an uncorrected violation is as specified in 30 CFR 1241.52(b).

[86 FR 34134, June 29, 2021]

§ 250.1454 How may I request a hearing on the record on a Notice of Noncompliance?

You may request a hearing on the record on a Notice of Noncompliance by filing a request within 30 days of the date you received the Notice of Noncompliance with the Hearings Division (Departmental), Office of Hearings and Appeals, U.S. Department of the Interior, 801 North Quincy Street, Arlington, Virginia 22203. You may do this regardless of whether you correct the violations identified in the Notice of Noncompliance.

§ 250.1455 Does my request for a hearing on the record affect the penalties?

(a) If you do not correct the violations identified in the Notice of Noncompliance, the penalties will continue to accrue even if you request a hearing on the record.

(b) You may petition the Hearings Division (Departmental) of the Office of Hearings and Appeals, to stay the accrual of penalties pending the hearing on the record and a decision by the Administrative Law Judge under § 250.1472.

(1) You must file your petition within 45 calendar days of receiving the Notice of Noncompliance.

(2) To stay the accrual of penalties, you must post a bond or other surety instrument, or demonstrate financial solvency, using the standards and requirements as prescribed in BOEM's regulations, 30 CFR part 550, subpart N. The posted amount must cover the unpaid principal and interest due for the Notice of Noncompliance, plus the amount of any penalties accrued before the date a stay becomes effective.

(3) The Hearings Division will grant or deny the petition under 43 CFR 4.21(b).

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1456 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?

(a) You may request a hearing on the record to challenge only the amount of a civil penalty when you receive a Notice of Civil Penalty, if you did not previously request a hearing on the record under § 250.1454. If you did not request a hearing on the record on the Notice of Noncompliance under § 250.1454, you may not contest your underlying liability for civil penalties.

(b) You must file your request within 10 days after you receive the Notice of Civil Penalty with the Hearings Division (Departmental), Office of Hearings and Appeals, U.S. Department of the Interior, 801 North Quincy Street, Arlington, Virginia 22203.

124 Penalties Without a Period To Correct
§ 250.1460 May I be subject to penalties without prior notice and an opportunity to correct?

The Federal Oil and Gas Royalty Management Act sets out several specific violations for which penalties accrue without an opportunity to first correct the violation.

(a) Under 30 U.S.C. 1719(c), you may be subject to civil penalties up to the maximum amount specified in 30 CFR 1241.60(b)(1) for each violation for each day that it continues if you:

(1) Fail or refuse to permit lawful entry, inspection, or audit; or

(2) Knowingly or willfully fail or refuse to notify the Secretary, within 5 business days after any well begins production on a lease site or allocated to a lease site, or resumes production in the case of a well which has been off production for more than 90 days, of the date on which production has begun or resumed.

(b) Under 30 U.S.C. 1719(d), you may be subject to civil penalties up to the maximum amount specified in 30 CFR 1241.60(b)(2) for each violation for each day that it continues if you:

(1) Knowingly or willfully prepare, maintain, or submit false, inaccurate, or misleading reports, notices, affidavits, records, data, or other written information;

(2) Knowingly or willfully take or remove, transport, use or divert any oil or gas from any lease site without having valid legal authority to do so; or

(3) Purchase, accept, sell, transport, or convey to another person, any oil or gas knowing or having reason to know that such oil or gas was stolen or unlawfully removed or diverted.

[86 FR 34134, June 29, 2021]

§ 250.1461 How will BSEE inform me of violations without a period to correct?

We will inform you of any violation, without a period to correct, by issuing a Notice of Noncompliance and Civil Penalty explaining the violation, how to correct it, and the penalty assessment. We will serve the Notice of Noncompliance and Civil Penalty by registered mail or personal service using your address of record as specified under 30 CFR part 1218, Subpart H.

§ 250.1462 How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct?

You may request a hearing on the record of a Notice of Noncompliance regarding violations without a period to correct by filing a request within 30 days after you receive the Notice of Noncompliance with the Hearings Division (Departmental), Office of Hearings and Appeals, U.S. Department of the Interior, 801 North Quincy Street, Arlington, Virginia 22203. You may do this regardless of whether you correct the violations identified in the Notice of Noncompliance.

§ 250.1463 Does my request for a hearing on the record affect the penalties?

(a) If you do not correct the violations identified in the Notice of Noncompliance regarding violations without a period to correct, the penalties will continue to accrue even if you request a hearing on the record.

(b) You may ask the Hearings Division (Departmental) to stay the accrual of penalties pending the hearing on the record and a decision by the Administrative Law Judge under § 250.1472.

(1) You must file your petition within 45 calendar days after you receive the Notice of Noncompliance.

(2) To stay the accrual of penalties, you must post a bond or other surety instrument, or demonstrate financial solvency, using the standards and requirements as prescribed in BOEM's regulations, 30 CFR part 550, subpart N. The posted amount must cover the unpaid principal and interest due for the Notice of Noncompliance, plus the amount of any penalties accrued before the date a stay becomes effective.

(3) The Hearings Division will grant or deny the petition under 43 CFR 4.21(b).

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36150, June 6, 2016]

§ 250.1464 May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?

(a) You may request a hearing on the record to challenge only the amount of a civil penalty when you receive a Notice of Civil Penalty regarding violations without a period to correct, if you did not previously request a hearing on the record under § 250.1462. If you did not request a hearing on the record on the Notice of Noncompliance under § 250.1462, you may not contest your underlying liability for civil penalties.

(b) You must file your request within 10 days after you receive Notice of Civil Penalty with the Hearings Division (Departmental), Office of Hearings and Appeals, U.S. Department of the Interior, 801 North Quincy, Arlington, Virginia 22203.

125 General Provisions
§ 250.1470 How does BSEE decide what the amount of the penalty should be?

We determine the amount of the penalty by considering the severity of the violations, your history of compliance, and if you are a small business.

§ 250.1471 Does the penalty affect whether I owe interest?

If you do not pay the penalty by the date required under § 250.1475(d), BSEE will assess you late payment interest on the penalty amount at the same rate interest is assessed under 30 CFR 1218.54.

§ 250.1472 How will the Office of Hearings and Appeals conduct the hearing on the record?

If you request a hearing on the record under §§ 250.1454, 250.1456, 250.1462, or 250.1464, the hearing will be conducted by a Departmental Administrative Law Judge from the Office of Hearings and Appeals. After the hearing, the Administrative Law Judge will issue a decision in accordance with the evidence presented and applicable law.

§ 250.1473 How may I appeal the Administrative Law Judge's decision?

If you are adversely affected by the Administrative Law Judge's decision, you may appeal that decision to the Interior Board of Land Appeals under 43 CFR part 4, subpart E.

§ 250.1474 May I seek judicial review of the decision of the Interior Board of Land Appeals?

Under 30 U.S.C. 1719(j), you may seek judicial review of the decision of the Interior Board of Land Appeals. A suit for judicial review in the District Court will be barred unless filed within 90 days after the final order.

§ 250.1475 When must I pay the penalty?

(a) You must pay the amount of the Notice of Civil Penalty issued under § 250.1453 or § 250.1461, if you do not request a hearing on the record under § 250.1454, § 250.1456, § 250.1462, or § 250.1464.

(b) If you request a hearing on the record under § 250.1454, § 250.1456, § 250.1462, or § 250.1464, but you do not appeal the determination of the Administrative Law Judge to the Interior Board of Land Appeals under § 250.1473, you must pay the amount assessed by the Administrative Law Judge.

(c) If you appeal the determination of the Administrative Law Judge to the Interior Board of Land Appeals, you must pay the amount assessed in the IBLA decision.

(d) You must pay the penalty assessed within 40 days after:

(1) You received the Notice of Civil Penalty, if you did not request a hearing on the record under either § 250.1454, § 250.1456, § 250.1462, or § 250.1464;

(2) You received an Administrative Law Judge's decision under § 250.1472, if you obtained a stay of the accrual of penalties pending the hearing on the record under § 250.1455(b) or § 250.1463(b) and did not appeal the Administrative Law Judge's determination to the IBLA under § 250.1473;

(3) You received an IBLA decision under § 250.1473 if the IBLA continued the stay of accrual of penalties pending its decision and you did not seek judicial review of the IBLA's decision; or

(4) A final non-appealable judgment of a court of competent jurisdiction is entered, if you sought judicial review of the IBLA's decision and the Department or the appropriate court suspended compliance with the IBLA's decision pending the adjudication of the case.

(e) If you do not pay, that amount is subject to collection under the provisions of § 250.1477.

§ 250.1476 Can BSEE reduce my penalty once it is assessed?

Under 30 U.S.C. 1719(g), the Director or his or her delegate may compromise or reduce civil penalties assessed under this part.

§ 250.1477 How may BSEE collect the penalty?

(a) BSEE may use all available means to collect the penalty including, but not limited to:

(1) Requiring the lease surety, for amounts owed by lessees, to pay the penalty;

(2) Deducting the amount of the penalty from any sums the United States owes to you; and

(3) Using judicial process to compel your payment under 30 U.S.C. 1719(k).

(b) If the Department uses judicial process, or if you seek judicial review under § 250.1474 and the court upholds assessment of a penalty, the court shall have jurisdiction to award the amount assessed plus interest assessed from the date of the expiration of the 90-day period referred to in § 250.1474. The amount of any penalty, as finally determined, may be deducted from any sum owing to you by the United States.

126 Criminal Penalties
§ 250.1480 May the United States criminally prosecute me for violations under Federal oil and gas leases?

If you commit an act for which a civil penalty is provided at 30 U.S.C. 1719(d) and § 250.1460(b), the United States may pursue criminal penalties as provided at 30 U.S.C. 1720, in addition to any authority for prosecution under other statutes.

Subpart O Well Control and Production Safety Training
§ 250.1500 Definitions.

Terms used in this subpart have the following meaning:

Contractor and contract personnel mean anyone, other than an employee of the lessee, performing well control, deepwater well control, or production safety duties for the lessee.

Deepwater well control means well control when you are using a subsea BOP system.

Employee means direct employees of the lessees who are assigned well control, deepwater well control, or production safety duties.

I or you means the lessee engaged in oil, gas, or sulphur operations in the Outer Continental Shelf (OCS).

Lessee means a person who has entered into a lease with the United States to explore for, develop, and produce the leased minerals. The term lessee also includes an owner of operating rights for that lease and the BOEM-approved assignee of that lease.

Periodic means occurring or recurring at regular intervals. Each lessee must specify the intervals for periodic training and periodic assessment of training needs in their training programs.

Production operations include, but are not limited to, separation, dehydration, compression, sweetening, and metering operations.

Production safety includes measures, practices, procedures, and equipment to ensure safe, accident-free, and pollution-free production operations, as well as installation, repair, testing, maintenance, and operation of surface and subsurface safety equipment.

Well completion/well workover means those operations following the drilling of a well that are intended to establish or restore production.

Well-control means methods used to minimize the potential for the well to flow or kick and to maintain control of the well in the event of flow or a kick. Well-control applies to drilling, well-completion, well-workover, abandonment, and well-servicing operations. It includes measures, practices, procedures and equipment, such as fluid flow monitoring, to ensure safe and environmentally protective drilling, completion, abandonment, and workover operations as well as the installation, repair, maintenance, and operation of surface and subsea well-control equipment.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50896, Aug. 22, 2012]

§ 250.1501 What is the goal of my training program?

The goal of your training program must be safe and clean OCS operations. To accomplish this, you must ensure that your employees and contract personnel engaged in well control, deepwater well control, or production safety operations understand and can properly perform their duties.

§ 250.1503 What are my general responsibilities for training?

(a) You must establish and implement a training program so that all of your employees are trained to competently perform their assigned well control, deepwater well control, and production safety duties. You must verify that your employees understand and can perform the assigned well control, deepwater well control, or production safety duties.

(b) If you conduct operations with a subsea BOP stack, your employees and contract personnel must be trained in deepwater well control. The trained employees and contract personnel must have a comprehensive knowledge of deepwater well control equipment, practices, and theory.

(c) You must have a training plan that specifies the type, method(s), length, frequency, and content of the training for your employees. Your training plan must specify the method(s) of verifying employee understanding and performance. This plan must include at least the following information:

(1) Procedures for training employees in well control, deepwater well control, or production safety practices;

(2) Procedures for evaluating the training programs of your contractors;

(3) Procedures for verifying that all employees and contractor personnel engaged in well control, deepwater well control, or production safety operations can perform their assigned duties;

(4) Procedures for assessing the training needs of your employees on a periodic basis;

(5) Recordkeeping and documentation procedures; and

(6) Internal audit procedures.

(d) Upon request of the District Manager or Regional Supervisor, you must provide:

(1) Copies of training documentation for personnel involved in well control, deepwater well control, or production safety operations during the past 5 years; and

(2) A copy of your training plan.

§ 250.1504 May I use alternative training methods?

You may use alternative training methods. These methods may include computer-based learning, films, or their equivalents. This training should be reinforced by appropriate demonstrations and “hands-on” training. Alternative training methods must be conducted according to, and meet the objectives of, your training plan.

§ 250.1505 Where may I get training for my employees?

You may get training from any source that meets the requirements of your training plan.

§ 250.1506 How often must I train my employees?

You determine the frequency of the training you provide your employees. You must do all of the following:

(a) Provide periodic training to ensure that employees maintain understanding of, and competency in, well control, deepwater well control, or production safety practices;

(b) Establish procedures to verify adequate retention of the knowledge and skills that employees need to perform their assigned well control, deepwater well control, or production safety duties; and

(c) Ensure that your contractors' training programs provide for periodic training and verification of well control, deepwater well control, or production safety knowledge and skills.

§ 250.1507 How will BSEE measure training results?

BSEE may periodically assess your training program, using one or more of the methods in this section.

(a) Training system audit. BSEE or its authorized representative may conduct a training system audit at your office. The training system audit will compare your training program against this subpart. You must be prepared to explain your overall training program and produce evidence to support your explanation.

(b) Employee or contract personnel interviews. BSEE or its authorized representative may conduct interviews at either onshore or offshore locations to inquire about the types of training that were provided, when and where this training was conducted, and how effective the training was.

(c) Employee or contract personnel testing. BSEE or its authorized representative may conduct testing at either onshore or offshore locations for the purpose of evaluating an individual's knowledge and skills in perfecting well control, deepwater well control, and production safety duties.

(d) Hands-on production safety, simulator, or live well testing. BSEE or its authorized representative may conduct tests at either onshore or offshore locations. Tests will be designed to evaluate the competency of your employees or contract personnel in performing their assigned well control, deepwater well control, and production safety duties. You are responsible for the costs associated with this testing, excluding salary and travel costs for BSEE personnel.

§ 250.1508 What must I do when BSEE administers written or oral tests?

BSEE or its authorized representative may test your employees or contract personnel at your worksite or at an onshore location. You and your contractors must:

(a) Allow BSEE or its authorized representative to administer written or oral tests; and

(b) Identify personnel by current position, years of experience in present position, years of total oil field experience, and employer's name (e.g., operator, contractor, or sub-contractor company name).

§ 250.1509 What must I do when BSEE administers or requires hands-on, simulator, or other types of testing?

If BSEE or its authorized representative conducts, or requires you or your contractor to conduct hands-on, simulator, or other types of testing, you must:

(a) Allow BSEE or its authorized representative to administer or witness the testing;

(b) Identify personnel by current position, years of experience in present position, years of total oil field experience, and employer's name (e.g., operator, contractor, or sub-contractor company name); and

(c) Pay for all costs associated with the testing, excluding salary and travel costs for BSEE personnel.

§ 250.1510 What will BSEE do if my training program does not comply with this subpart?

If BSEE determines that your training program is not in compliance, we may initiate one or more of the following enforcement actions:

(a) Issue an Incident of Noncompliance (INC);

(b) Require you to revise and submit to BSEE your training plan to address identified deficiencies;

(c) Assess civil/criminal penalties; or

(d) Initiate disqualification procedures.

Subpart P Sulphur Operations
§ 250.1600 Performance standard.

(a) All operations for sulphur exploration, development, and production on the OCS must comply with:

(1) A BOEM-approved Exploration Plan or Development and Production Plan;

(2) The applicable regulations in 30 CFR part 250; and

(3) All applicable laws, regulations, and conditions of approval.

(b) You must conduct such operations in a manner that protects against harm or damage to life (including fish and other aquatic life), property, natural resources of the OCS including any mineral deposits (in areas leased or not leased), the National security or defense, and the marine, coastal, or human environment.

[90 FR 36109, Aug. 1, 2025]

§ 250.1601-250.1634 [Reserved]
Subpart Q Decommissioning Activities
127 General
§ 250.1700 What do the terms “decommissioning,” “obstructions,” “facility,” and “predecessor” mean in this subpart?

(a) Decommissioning means:

(1) Ending oil, gas, or sulphur operations; and

(2) Returning the lease, pipeline right-of-way, or the area of a right-of-use and easement to a condition that meets the requirements of BSEE and other agencies that have jurisdiction over decommissioning activities.

(b) Obstructions mean structures, equipment, or objects that were used in oil, gas, or sulphur operations or marine growth that, if left in place, would hinder other users of the OCS. Obstructions may include, but are not limited to, shell mounds, wellheads, casing stubs, mud line suspensions, well protection devices, subsea trees, jumper assemblies, umbilicals, manifolds, termination skids, production and pipeline risers, platforms, templates, pilings, pipelines, pipeline valves, and power cables.

(c) Facility means any installation other than a pipeline used for oil, gas, or sulphur activities that is permanently or temporarily attached to the seabed on the OCS. Facilities include production and pipeline risers, templates, pilings, and any other facility or equipment that constitutes an obstruction such as jumper assemblies, termination skids, umbilicals, anchors, and mooring lines.

(d) Predecessor means a prior lessee or owner of operating rights, or a prior holder of a right-of-use and easement grant or a pipeline right-of-way grant, that is liable for accrued obligations on that lease or grant.

[76 FR 64462, Oct. 18, 2011, as amended at 88 FR 23579, Apr. 18, 2023]

§ 250.1701 Who must meet the decommissioning obligations in this subpart?

(a) Lessees, owners of operating rights, and their predecessors are jointly and severally liable for meeting decommissioning obligations for facilities on leases, including the obligations related to lease-term pipelines, as the obligations accrue and until each obligation is met.

(b) All holders of a right-of-way grant and their predecessors are jointly and severally liable for meeting decommissioning obligations for facilities on their right-of-way, including right-of-way pipelines, as the obligations accrue and until each obligation is met.

(c) All right-of-use and easement grant holders and prior lessees or owners of operating rights of the parcel on whose leases there existed facilities or obstructions that remain on the right-of-use and easement grant are jointly and severally liable for meeting decommissioning obligations, including obligations for any well, pipeline, platform or other facility, or an obstruction, on their right-of-use and easement, as the obligations accrue and until each obligation is met.

(d) In this subpart, the terms “you” or “I” refer to lessees and owners of operating rights as to facilities installed under the authority of a lease; to pipeline right-of-way grant holders as to facilities installed under the authority of a pipeline right-of-way grant; and to right-of-use and easement grant holders as to facilities constructed, modified, or maintained under the authority of the right-of-use and easement grant. Predecessors to any of these interest holders are also included within the scope of these terms as appropriate in the context of the particular regulation.

[88 FR 23580, Apr. 18, 2023]

§ 250.1702 When do I accrue decommissioning obligations?

You accrue decommissioning obligations when you do any of the following:

(a) Drill a well;

(b) Install a platform, pipeline, or other facility;

(c) Create an obstruction to other users of the OCS;

(d) Are or become a lessee or the owner of operating rights of a lease on which there is a well that has not been permanently plugged according to this subpart, a platform, a lease term pipeline, or other facility, or an obstruction;

(e) Are or become a holder of a pipeline right-of-way grant on which there is a pipeline, platform, other facility, or an obstruction;

(f) Are or become the holder of a right-of-use and easement grant on which there is a well, pipeline, platform, other facility, or an obstruction; or

(g) Re-enter a well that was previously plugged according to this subpart.

[76 FR 64462, Oct. 18, 2011, as amended at 88 FR 23580, Apr. 18, 2023]

§ 250.1703 What are the general requirements for decommissioning?

When your facilities are no longer useful for operations, you must:

(a) Get approval from the appropriate District Manager before decommissioning wells and from the Regional Supervisor before decommissioning platforms and pipelines or other facilities;

(b) Permanently plug all wells. Packers and bridge plugs used as qualified mechanical barriers must comply with ANSI/API Specification 11D1 (incorporated by reference, see § 250.198). You must have two independent barriers, one being an ANSI/API Specification 11D1 qualified mechanical barrier, in the exposed center wellbore prior to removing the tree and/or well control equipment;

(c) Remove all platforms and other facilities, except as provided in §§ 250.1725(a) and 250.1730.

(d) Decommission all pipelines;

(e) Clear the seafloor of all obstructions created by your lease, pipeline right-of-way, or right-of-use and easement operations;

(f) Follow all applicable requirements of subpart G of this part; and

(g) Conduct all decommissioning activities in a manner that is safe, does not unreasonably interfere with other uses of the OCS, and does not cause undue or serious harm or damage to the human, marine, or coastal environment.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 26037, Apr. 29 2016; 84 FR 21984, May 15, 2019; 88 FR 23580, Apr. 18, 2023; 91 FR 35362, June 10, 2026]

§ 250.1704 What decommissioning applications and reports must I submit and when must I submit them?

You must submit decommissioning applications, receive approval of those applications, and submit subsequent reports according to the requirements and deadlines in the following table.

Decommissioning Applications and Reports Table

Decommissioning applications and reports | When to submit | Instructions

(a) Initial platform removal application [not required in the Gulf of America OCS Region] | In the Pacific OCS Region or Alaska OCS Region, submit the application to the Regional Supervisor at least 2 years before production is projected to cease | Include information required under § 250.1726.

(b) Submit decommissioning plan per § 250.1708(a)(3) that addresses all wells, platforms and other facilities, pipelines, and site clearance after receiving an order to perform decommissioning | Within 150 days of receiving an order to perform decommissioning under § 250.1708 | Include information required under § 250.1708(a)(2) and (3).

(c) Final removal application for a platform or other facility | Before removing a platform or other facility in the Gulf of America OCS Region, or not more than 2 years after the submittal of an initial platform removal application to the Pacific OCS Region and the Alaska OCS Region | Include information required under § 250.1727.

(d) Post-removal report for a platform or other facility | Within 30 days after you remove a platform or other facility | Include information required under § 250.1729.

(e) Pipeline decommissioning application | Before you decommission a pipeline | Include information required under § 250.1751(a) or § 250.1752(a), as applicable.

(f) Post-pipeline decommissioning report | Within 30 days after you decommission a pipeline | Include information required under § 250.1753.

(g) Site clearance report for a platform or other facility | Within 30 days after you complete site clearance verification activities | Include information required under § 250.1743(b).

(h) Form BSEE-0124, Application for Permit to Modify (APM). The submission of your APM must be accompanied by payment of the service fee listed in § 250.125 | (1) Before you temporarily abandon or permanently plug a well or zone | (i) Include information required under §§ 250.1712 and 250.1721. (ii) When using a BOP for abandonment operations, include information required under § 250.731.

(2) Before you install a subsea protective device | Refer to § 250.1722(a).

(3) Before you remove any casing stub or mud line suspension equipment and any subsea protective device | Refer to § 250.1723.

(4) Within 30 days after you complete site clearance verification activities | Include information required under § 250.1743(a).

(i) Form BSEE-0125, End of Operations Report (EOR) | (1) Within 30 days after you complete a protective device trawl test | Include information required under § 250.1722(d).

(2) Within 30 days after completion of decommissioning activity | Include information required under §§ 250.1712 and 250.1721.

(j) A certified summary of expenditures for permanently plugging any well, removal of any platform or other facility, clearance of any site after wells have been plugged or platforms or facilities removed, and decommissioning of pipelines | Within 120 days after completion of each decommissioning activity specified in this paragraph | Submit to the Regional Supervisor a complete summary of expenditures actually incurred for each decommissioning activity (including, but not limited to, the use of rigs, vessels, equipment, supplies and materials; transportation of any kind; personnel; and services). Include in, or attach to, the summary a certified statement by an authorized representative of your company attesting to the truth, accuracy and completeness of the summary. The Regional Supervisor may provide specific instructions or guidance regarding how to submit the certified summary.

(k) If requested by the Regional Supervisor, additional information in support of any decommissioning activity expenditures included in a summary submitted under paragraph (i) of this section | Within a reasonable time as determined by the Regional Supervisor | The Regional Supervisor will review the summary and may provide specific instructions or guidance regarding the submission of additional information (including, but not limited to, copies of contracts and invoices), if requested, to complete or otherwise support the summary.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50896, Aug. 22, 2012; 80 FR 75810, Dec. 4, 2015; 81 FR 26037, Apr. 29, 2016; 81 FR 80591, Nov. 16, 2016; 84 FR 21984, May 15, 2019; 88 FR 23580, Apr. 18, 2023; 90 FR 44327, Sept. 15, 2025]

§§ 250.1705-250.1707 [Reserved]
§ 250.1708 How will BSEE enforce accrued decommissioning obligations against predecessors?

(a) When BSEE issues an order to predecessors to perform accrued decommissioning obligations, the order recipients must, unless otherwise specified in the order:

(1) Within 30 days of receiving the order, begin maintaining and monitoring, through a single entity identified to BSEE, any facility, including wells and pipelines, as identified by BSEE in the order and in accordance with applicable requirements under this part (including, but not limited to, testing safety valves and sensors, draining vessels, and performing pollution inspections);

(2) Within 90 days of receiving the order, designate a single entity to serve as operator or agent for the decommissioning operations;

(3) Within 150 days of receiving the order, submit through the entity identified in paragraph (a)(2) of this section a decommissioning plan for approval by the Regional Supervisor that includes the scope of work and a reasonable decommissioning schedule for all wells, platforms and other facilities, pipelines, and site clearance, as identified in the order; and

(4) Perform the required decommissioning in the time and manner specified by BSEE in its decommissioning plan approval.

(b) Failure to comply with the obligations under paragraph (a) of this section to maintain and monitor a facility or to submit a decommissioning plan may result in a Notice of Incident of Noncompliance and potentially other enforcement actions, including civil penalties and disqualification as an operator.

(c) BSEE's issuance of orders to any predecessors will not relieve any current lessee or grant holder, or any other predecessor, of its obligations to comply with any prior decommissioning order or to satisfy any accrued decommissioning obligations.

(d) A pending appeal, pursuant to 30 CFR part 290, of any decommissioning order does not preclude BSEE from proceeding against any or all predecessors other than the appellant.

[88 FR 23580, Apr. 18, 2023]

§ 250.1709 [Reserved]
128 Permanently Plugging Wells
§ 250.1710 When must I permanently plug all wells on a lease?

You must permanently plug all wells on a lease within 1 year after the lease terminates.

§ 250.1711 When will BSEE order me to permanently plug a well?

BSEE will order you to permanently plug a well if that well:

(a) Poses a hazard to safety or the environment; or

(b) Is not useful for lease operations and is not capable of oil, gas, or sulphur production in paying quantities.

§ 250.1712 What information must I submit before I permanently plug a well or zone?

Before you permanently plug a well or zone, you must submit form BSEE-0124, Application for Permit to Modify, to the appropriate District Manager and receive approval. A request for approval must contain the following information:

(a) The reason you are plugging the well (or zone), for completions with production amounts specified by the Regional Supervisor, along with substantiating information demonstrating its lack of capacity for further profitable production of oil, gas, or sulfur;

(b) Recent well test data and pressure data, if available;

(c) Maximum possible surface pressure, and how it was determined;

(d) Type and weight of well-control fluid you will use;

(e) A description of the work;

(f) A current and proposed well schematic and description that includes:

(1) Well depth;

(2) All perforated intervals that have not been plugged;

(3) Casing and tubing depths and details;

(4) Subsurface equipment;

(5) Estimated tops of cement (and the basis of the estimate) in each casing annulus;

(6) Plug locations;

(7) Plug types;

(8) Plug lengths;

(9) Properties of mud and cement to be used;

(10) Perforating and casing cutting plans;

(11) Plug testing plans;

(12) Casing removal (including information on explosives, if used);

(13) Proposed casing removal depth; and

(14) Your plans to protect archaeological and sensitive biological features, including anchor damage during plugging operations, a brief assessment of the environmental impacts of the plugging operations, and the procedures and mitigation measures you will take to minimize such impacts; and

(g) Certification by a Registered Professional Engineer of the well abandonment design and procedures and that all plugs meet the requirements in the table in § 250.1715. In addition to the requirements of § 250.1715, the Registered Professional Engineer must also certify the design will include two independent barriers, one of which must be a mechanical barrier, in the center wellbore as described in § 250.420(b)(3). The Registered Professional Engineer must be registered in a State of the United States and have sufficient expertise and experience to perform the certification. You must submit this certification with your APM (Form BSEE-0124).

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50900, Aug. 22, 2012]

§ 250.1713 [Reserved]
§ 250.1714 What must I accomplish with well plugs?

You must ensure that all well plugs:

(a) Provide downhole isolation of hydrocarbon and sulphur zones;

(b) Protect freshwater aquifers; and

(c) Prevent migration of formation fluids within the wellbore or to the seafloor.

§ 250.1715 How must I permanently plug a well?

(a) You must permanently plug wells according to the table in this section. The District Manager may require additional well plugs as necessary.

Permanent Well Plugging Requirements

If you have . . . | Then you must use . . .

(1) Zones in open hole, | Cement plug(s) set from at least 100 feet below the bottom to 100 feet above the top of oil, gas, and fresh-water zones to isolate fluids in the strata

(2) Open hole below casing, | (i) A cement plug, set by the displacement method, at least 100 feet above and below deepest casing shoe;

(ii) A cement retainer with effective back-pressure control set 50 to 100 feet above the casing shoe, and a cement plug that extends at least 100 feet below the casing shoe and at least 50 feet above the retainer; or

(iii) A bridge plug set 50 feet to 100 feet above the shoe with 50 feet of cement on top of the bridge plug, for expected or known lost circulation conditions

(3) A perforated zone that is currently open and not previously squeezed or isolated, | (i) A method to squeeze cement to all perforations; (ii) A cement plug set by the displacement method, at least 100 feet above to 100 feet below the perforated interval, or down to a casing plug, whichever is less; or (iii) If the perforated zones are isolated from the hole below, you may use any of the plugs specified in paragraphs (a)(3)(iii)(A) through (E) of this section instead of those specified in paragraphs (a)(3)(i) and (a)(3)(ii) of this section.

(A) A cement retainer with effective back-pressure control set 50 to 100 feet above the top of the perforated interval, and a cement plug that extends at least 100 feet below the bottom of the perforated interval with at least 50 feet of cement above the retainer;

(B) A casing bridge plug set 50 to 100 feet above the top of the perforated interval and at least 50 feet of cement on top of the bridge plug;

(C) A cement plug at least 200 feet in length, set by the displacement method, with the bottom of the plug no more than 100 feet above the perforated interval;

(D) A through-tubing basket plug set no more than 100 feet above the perforated interval with at least 50 feet of cement on top of the basket plug; or

(E) A tubing plug set no more than 100 feet above the perforated interval topped with a sufficient volume of cement so as to extend at least 100 feet above the uppermost packer in the wellbore and at least 300 feet of cement in the casing annulus immediately above the packer.

(4) A casing stub where the stub end is within the casing, | (i) A cement plug set at least 100 feet above and below the stub end;

(ii) A cement retainer or bridge plug set at least 50 to 100 feet above the stub end with at least 50 feet of cement on top of the retainer or bridge plug; or

(iii) A cement plug at least 200 feet long with the bottom of the plug set no more than 100 feet above the stub end.

(5) A casing stub where the stub end is below the casing, | A plug as specified in paragraph (a)(1) or (a)(2) of this section, as applicable.

(6) An annular space that communicates with open hole and extends to the mud line, | A cement plug at least 200 feet long set in the annular space. For a well completed above the ocean surface, you must pressure test each casing annulus to verify isolation.

(7) A subsea well with unsealed annulus, | A cutter to sever the casing, and you must set a stub plug as specified in paragraphs (a)(4) and (a)(5) of this section.

(8) A well with casing, | A cement surface plug at least 150 feet long set in the smallest casing that extends to the mud line with the top of the plug no more than 150 feet below the mud line.

(9) Fluid left in the hole, | A fluid in the intervals between the plugs that is dense enough to exert a hydrostatic pressure that is greater than the formation pressures in the intervals.

(10) Permafrost areas, | (i) A fluid to be left in the hole that has a freezing point below the temperature of the permafrost, and a treatment to inhibit corrosion; and

(ii) Cement plugs designed to set before freezing and have a low heat of hydration.

(11) Removed the barriers required in § 250.420(b)(3) for the well to be completed | Two independent barriers, one of which must be a mechanical barrier, in the center wellbore as described in § 250.420(b)(3) once the well is to be placed in a permanent or temporary abandonment

(b) You must test the first plug below the surface plug and all plugs in lost circulation areas that are in open hole. The plug must pass one of the following tests to verify plug integrity:

(1) A pipe weight of at least 15,000 pounds on the plug; or

(2) A pump pressure of at least 1,000 pounds per square inch. Ensure that the pressure does not drop more than 10 percent in 15 minutes. The District Manager may require you to tests other plug(s).

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50900, Aug. 22, 2012; 81 FR 26038, Apr. 29, 2016]

§ 250.1716 To what depth must I remove wellheads and casings?

(a) Unless the District Manager approves an alternate depth under paragraph (b) of this section, you must remove all wellheads and casings to at least 15 feet below the mud line.

(b) The District Manager may approve an alternate removal depth if:

(1) The wellhead or casing would not become an obstruction to other users of the seafloor or area, and geotechnical and other information you provide demonstrate that erosional processes capable of exposing the obstructions are not expected; or

(2) You determine, and BSEE concurs, that you must use divers, and the seafloor sediment stability poses safety concerns; or

(3) The water depth is greater than 1,000 feet.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21985, May 15, 2019]

§ 250.1717 [Reserved]
129 Temporary Abandoned Wells
§ 250.1721 If I temporarily abandon a well that I plan to re-enter, what must I do?

You may temporarily abandon a well when it is necessary for proper development and production of a lease. To temporarily abandon a well, you must do all of the following:

(a) Submit form BSEE-0124, Application for Permit to Modify, and the applicable information required by § 250.1712 to the appropriate District Manager and receive approval;

(b) Adhere to the plugging and testing requirements for permanently plugged wells listed in the table in § 250.1715, except for § 250.1715(a)(8). You do not need to sever the casings, remove the wellhead, or clear the site;

(c) Set a bridge plug or a cement plug at least 100-feet long at the base of the deepest casing string, unless the casing string has been cemented and has not been drilled out. If a cement plug is set, it is not necessary for the cement plug to extend below the casing shoe into the open hole;

(d) Set a retrievable or a permanent-type bridge plug or a cement plug at least 100 feet long in the inner-most casing. The top of the bridge plug or cement plug must be no more than 1,000 feet below the mud line. BSEE may consider approving alternate requirements for subsea wells case-by-case;

(e) Identify and report subsea wellheads, casing stubs, or other obstructions that extend above the mud line according to U.S. Coast Guard (USCG) requirements;

(f) Except in water depths greater than 300 feet, protect subsea wellheads, casing stubs, mud line suspensions, or other obstructions remaining above the seafloor by using one of the following methods, as approved by the District Manager or Regional Supervisor:

(1) A caisson designed according to 30 CFR 250, subpart I, and equipped with aids to navigation;

(2) A jacket designed according to 30 CFR 250, subpart I, and equipped with aids to navigation; or

(3) A subsea protective device that meets the requirements in § 250.1722.

(g) Submit certification by a Registered Professional Engineer of the well abandonment design and procedures and that all plugs meet the requirements of paragraph (b) of this section. In addition to the requirements of paragraph (b) of this section, the Registered Professional Engineer must also certify the design will include two independent barriers, one of which must be a mechanical barrier, in the center wellbore as described in § 250.420(b)(3). The Registered Professional Engineer must be registered in a State of the United States and have sufficient expertise and experience to perform the certification. You must submit this certification with your APM (Form BSEE-0124) required by § 250.1712 of this part.

[76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50900, Aug. 22, 2012; 81 FR 26038, Apr. 29, 2016]

§ 250.1722 If I install a subsea protective device, what requirements must I meet?

If you install a subsea protective device under § 250.1721(f)(3), you must install it in a manner that allows fishing gear to pass over the obstruction without damage to the obstruction, the protective device, or the fishing gear.

(a) Use form BSEE-0124, Application for Permit to Modify to request approval from the appropriate District Manager to install a subsea protective device.

(b) The protective device may not extend more than 10 feet above the seafloor (unless BSEE approves otherwise).

(c) You must trawl over the protective device when you install it (adhere to the requirements at § 250.1741(d) through (h)). If the trawl does not pass over the protective device or causes damage to it, you must notify the appropriate District Manager within 5 days and perform remedial action within 30 days of the trawl;

(d) Within 30 days after you complete the trawling test described in paragraph (c) of this section, submit a report to the appropriate District Manager using form BSEE-0125, End of Operations Report (EOR) that includes the following:

(1) The date(s) the trawling test was performed and the vessel that was used;

(2) A plat at an appropriate scale showing the trawl lines;

(3) A description of the trawling operation and the net(s) that were used;

(4) An estimate by the trawling contractor of the seafloor penetration depth achieved by the trawl;

(5) A summary of the results of the trawling test including a discussion of any snags and interruptions, a description of any damage to the protective covering, the casing stub or mud line suspension equipment, or the trawl, and a discussion of any snag removals requiring diver assistance; and

(6) A letter signed by your authorized representative stating that he/she witnessed the trawling test.

(e) If a temporarily abandoned well is protected by a subsea device installed in a water depth less than 100 feet, mark the site with a buoy installed according to the USCG requirements.

(f) Provide annual reports to the Regional Supervisor describing your plans to either re-enter and complete the well or to permanently plug the well.

(g) Ensure that all subsea wellheads, casing stubs, mud line suspensions, or other obstructions in water depths less than 300 feet remain protected.

(1) To confirm that the subsea protective covering remains properly installed, either conduct a visual inspection or perform a trawl test at least annually.

(2) If the inspection reveals that a casing stub or mud line suspension is no longer properly protected, or if the trawl does not pass over the subsea protective covering without causing damage to the covering, the casing stub or mud line suspension equipment, or the trawl, notify the appropriate District Manager within 5 days, and perform the necessary remedial work within 30 days of discovery of the problem.

(3) In your annual report required by paragraph (f) of this section, include the inspection date, results, and method used and a description of any remedial work you will perform or have performed.

(h) You may request approval to waive the trawling test required by paragraph (c) of this section if you plan to use either:

(1) A buoy with automatic tracking capabilities installed and maintained according to USCG requirements at 33 CFR part 67 (or its successor); or

(2) A design and installation method that has been proven successful by trawl testing of previous protective devices of the same design and installed in areas with similar bottom conditions.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21985, May 15, 2019]

§ 250.1723 What must I do when it is no longer necessary to maintain a well in temporary abandoned status?

If you or BSEE determines that continued maintenance of a well in a temporary abandoned status is not necessary for the proper development or production of a lease, you must:

(a) Promptly and permanently plug the well according to § 250.1715;

(b) Remove any casing stub or mud line suspension equipment and any subsea protective covering. You must submit a request for approval to perform such work to the appropriate District Manager using form BSEE-0124, Application for Permit to Modify; and

(c) Clear the well site according to §§ 250.1740 through 250.1742.

130 Removing Platforms and Other Facilities
§ 250.1725 When do I have to remove platforms and other facilities?

(a) You must remove all platforms and other facilities within 1 year after the lease, pipeline right-of-way, or right-of-use and easement terminates, unless you receive approval to maintain the structure to conduct other activities. Platforms include production platforms, well jackets, single-well caissons, and pipeline accessory platforms. Other activities include those supporting OCS oil and gas production and transportation, as well as other energy-related or marine-related uses (including LNG) for which adequate financial assurance for decommissioning has been provided to a Federal agency which has given BSEE a commitment that it has and will exercise authority to compel the performance of decommissioning within a time following cessation of the new use acceptable to BSEE. The approval will specify:

(1) Whether you must continue to maintain any financial assurance for decommissioning; and

(2) Whether, and under what circumstances, you must perform any decommissioning not performed by the new facility owner/user.

(b) Before you may remove a platform or other facility, you must submit a final removal application to the Regional Supervisor for approval and include the information listed in § 250.1727.

(c) You must remove a platform or other facility according to the approved application.

(d) You must flush all production risers with seawater before you remove them.

(e) You must notify the Regional Supervisor at least 48 hours before you begin the removal operations.

[76 FR 64462, Oct. 18, 2011, as amended at 88 FR 23581, Apr. 18, 2023]

§ 250.1726 When must I submit an initial platform removal application and what must it include?

An initial platform removal application is required only for leases and pipeline rights-of-way in the Pacific OCS Region or the Alaska OCS Region. It must include the following information:

(a) Platform or other facility removal procedures, including the types of vessels and equipment you will use;

(b) Facilities (including pipelines) you plan to remove or leave in place;

(c) Platform or other facility transportation and disposal plans;

(d) Plans to protect marine life and the environment during decommissioning operations, including a brief assessment of the environmental impacts of the operations, and procedures and mitigation measures that you will take to minimize the impacts; and

(e) A projected decommissioning schedule.

§ 250.1727 What information must I include in my final application to remove a platform or other facility?

You must submit to the Regional Supervisor, a final application for approval to remove a platform or other facility. Your application must be accompanied by payment of the service fee listed in § 250.125. If you are proposing to use explosives, provide three copies of the application. If you are not proposing to use explosives, provide two copies of the application. Include the following information in the final removal application, as applicable:

(a) Identification of the applicant including:

(1) Lease operator/pipeline right-of-way holder;

(2) Address;

(3) Contact person and telephone number; and

(4) Shore base.

(b) Identification of the structure you are removing including:

(1) Platform Name/BSEE Complex ID Number;

(2) Location (lease/right-of-way, area, block, and block coordinates);

(3) Date installed (year);

(4) Proposed date of removal (Month/Year); and

(5) Water depth.

(c) Description of the structure you are removing including:

(1) Configuration (attach a photograph or a diagram);

(2) Size;

(3) Number of legs/casings/pilings;

(4) Diameter and wall thickness of legs/casings/pilings;

(5) Whether piles are grouted inside or outside;

(6) Brief description of soil composition and condition;

(7) The sizes and weights of the jacket, topsides (by module), conductors, and pilings; and

(8) The maximum removal lift weight and estimated number of main lifts to remove the structure.

(d) A description, including anchor pattern, of the vessel(s) you will use to remove the structure.

(e) Identification of the purpose, including:

(1) Lease expiration/right-of-way relinquishment date; and

(2) Reason for removing the structure.

(f) A description of the removal method, including:

(1) A brief description of the method you will use;

(2) If you are using explosives, the following:

(i) Type of explosives;

(ii) Number and sizes of charges;

(iii) Whether you are using single shot or multiple shots;

(iv) If multiple shots, the sequence and timing of detonations;

(v) Whether you are using a bulk or shaped charge;

(vi) Depth of detonation below the mud line; and

(vii) Whether you are placing the explosives inside or outside of the pilings;

(3) If you will use divers or acoustic devices to conduct a pre-removal survey to detect the presence of turtles and marine mammals, a description of the proposed detection method; and

(4) A statement whether or not you will use transducers to measure the pressure and impulse of the detonations.

(g) Your plans for transportation and disposal (including as an artificial reef) or salvage of the removed platform.

(h) If available, the results of any recent biological surveys conducted in the vicinity of the structure and recent observations of turtles or marine mammals at the structure site.

(i) Your plans to protect archaeological and sensitive biological features during removal operations, including a brief assessment of the environmental impacts of the removal operations and procedures and mitigation measures you will take to minimize such impacts.

(j) A statement whether or not you will use divers to survey the area after removal to determine any effects on marine life.

§ 250.1728 To what depth must I remove a platform or other facility?

(a) Unless the Regional Supervisor approves an alternate depth under paragraph (b) of this section, you must remove all platforms and other facilities (including templates and pilings) to at least 15 feet below the mud line.

(b) The Regional Supervisor may approve an alternate removal depth if:

(1) The remaining structure would not become an obstruction to other users of the seafloor or area, and geotechnical and other information you provide demonstrate that erosional processes capable of exposing the obstructions are not expected; or

(2) You determine, and BSEE concurs, that you must use divers and the seafloor sediment stability poses safety concerns; or

(3) The water depth is greater than 800 meters (2,624 feet).

§ 250.1729 After I remove a platform or other facility, what information must I submit?

Within 30 days after you remove a platform or other facility, you must submit a written report to the Regional Supervisor that includes the following:

(a) A summary of the removal operation including the date it was completed;

(b) A description of any mitigation measures you took; and

(c) A statement signed by your authorized representative that certifies that the types and amount of explosives you used in removing the platform or other facility were consistent with those set forth in the approved removal application.

§ 250.1730 When might BSEE approve partial structure removal or toppling in place?

The Regional Supervisor may grant a departure from the requirement to remove a platform or other facility by approving partial structure removal or toppling in place for conversion to an artificial reef if you meet the following conditions:

(a) The structure becomes part of a State artificial reef program, and the responsible State agency acquires a permit from the U.S. Army Corps of Engineers and accepts title and liability for the structure; and

(b) You satisfy any U.S. Coast Guard (USCG) navigational requirements for the structure.

§ 250.1731 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE?

(a) The holder of an Alternate Use RUE issued under 30 CFR part 585 is responsible for all decommissioning obligations that accrue following the issuance of the Alternate Use RUE and which pertain to the Alternate Use RUE. See 30 CFR part 585, subpart J, for additional information concerning the decommissioning responsibilities of an Alternate Use RUE grant holder.

(b) The lessee under the lease originally issued under 30 CFR part 556 will remain responsible for decommissioning obligations that accrued before issuance of the Alternate Use RUE, as well as for decommissioning obligations that accrue following issuance of the Alternate Use RUE to the extent associated with continued activities authorized under this part.

(c) If a lease issued under 30 CFR part 556 is cancelled or otherwise terminated under any provision of this subchapter, the lessee, upon our approval, may defer removal of any OCS facility within the lease area that is subject to an Alternate Use RUE. If we elect to grant such a deferral, the lessee remains responsible for removing the facility upon termination of the Alternate Use RUE and will be required to retain sufficient bonding or other financial assurances to ensure that the structure is removed or otherwise decommissioned in accordance with the provisions of this subpart.

131 Site Clearance for Wells, Platforms, and Other Facilities
§ 250.1740 How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?

Within 60 days after you permanently plug a well or remove a platform or other facility, you must verify that the site is clear of obstructions by using one of the following methods:

(a) For a well site, you must either:

(1) Drag a trawl over the site;

(2) Scan across the location using sonar equipment;

(3) Inspect the site using a diver;

(4) Videotape the site using a camera on a remotely operated vehicle (ROV); or

(5) Use another method approved by the District Manager if the particular site conditions warrant.

(b) For a platform or other facility site in water depths less than 300 feet, you must drag a trawl over the site.

(c) For a platform or other facility site in water depths 300 feet or more, you must either:

(1) Drag a trawl over the site;

(2) Scan across the site using sonar equipment; or

(3) Use another method approved by the Regional Supervisor if the particular site conditions warrant.

§ 250.1741 If I drag a trawl across a site, what requirements must I meet?

If you drag a trawl across the site in accordance with § 250.1740, you must meet all of the requirements of this section.

(a) You must drag the trawl in a grid-like pattern as shown in the following table:

For a . . . | You must drag the trawl across a . . .

(1) Well site, | 300-foot-radius circle centered on the well location.

(2) Subsea well site, | 600-foot-radius circle centered on the well location.

(3) Platform site, | 1,320-foot-radius circle centered on the location of the platform.

(4) Single-well caisson, well protector jacket, template, or manifold, | 600-foot-radius circle centered on the structure location.

(b) You must trawl 100 percent of the limits described in paragraph (a) of this section in two directions.

(c) You must mark the area to be cleared as a hazard to navigation according to USCG requirements until you complete the site clearance procedures.

(d) You must use a trawling vessel equipped with a calibrated navigational positioning system capable of providing position accuracy of ±30 feet.

(e) You must use a trawling net that is representative of those used in the commercial fishing industry (one that has a net strength equal or greater than that provided by No. 18 twine).

(f) You must ensure that you trawl no closer than 300 feet from a shipwreck, and 500 feet from a sensitive biological feature.

(g) If you trawl near an active pipeline, you must meet the requirements in the following table:

For . . . | You must trawl . . . | And you must . . .

(1) Buried active pipelines, | First contact the pipeline owner or operator to determine the condition of the pipeline before trawling over the buried pipeline.

(2) Unburied active pipelines that are 8 inches in diameter or larger, | no closer than 100 feet to the either side of the pipeline, | Trawl parallel to the pipeline Do not trawl across the pipeline.

(3) Unburied smaller diameter active pipelines in the trawl area that have obstructions (e.g., pipeline valves) present, | no closer than 100 feet to either side of the pipeline, | Trawl parallel to the pipeline. Do not trawl across the pipeline.

(4) Unburied active pipelines in the trawl area that are smaller than 8 inches in diameter and have no obstructions present, | parallel to the pipeline,

(h) You must ensure that any trawling contractor you may use:

(1) Has no corporate or other financial ties to you; and

(2) Has a valid commercial trawling license for both the vessel and its captain.

§ 250.1742 What other methods can I use to verify that a site is clear?

If you do not trawl a site, you can verify that the site is clear of obstructions by using any of the methods shown in the following table:

If you use . . . | You must . . . | And you must . . .

(a) Sonar, | cover 100 percent of the appropriate grid area listed in § 250.1741(a), | Use a sonar signal with a frequency of at least 500 kHz.

(b) A diver, | ensure that the diver visually inspects 100 percent of the appropriate grid area listed in § 250.1741(a), | Ensure that the diver uses a search pattern of concentric circles or parallel lines spaced no more than 10 feet apart.

(c) An ROV (remotely operated vehicle), | ensure that the ROV camera records videotape over 100 percent of the appropriate grid area listed in § 250.1741(a), | Ensure that the ROV uses a pattern of concentric circles or parallel lines spaced no more than 10 feet apart.

§ 250.1743 How do I certify that a site is clear of obstructions?

(a) For a well site, you must submit to the appropriate District Manager within 30 days after you complete the verification activities a form BSEE-0124, Application for Permit to Modify, to include the following information:

(1) A signed certification that the well site area is cleared of all obstructions;

(2) The date the verification work was performed and the vessel used;

(3) The extent of the area surveyed;

(4) The survey method used;

(5) The results of the survey, including a list of any debris removed or a statement from the trawling contractor that no objects were recovered; and

(6) A post-trawling job plot or map showing the trawled area.

(b) For a platform or other facility site, you must submit the following information to the appropriate Regional Supervisor within 30 days after you complete the verification activities:

(1) A letter signed by an authorized company official certifying that the platform or other facility site area is cleared of all obstructions and that a company representative witnessed the verification activities;

(2) A letter signed by an authorized official of the company that performed the verification work for you certifying that it cleared the platform or other facility site area of all obstructions;

(3) The date the verification work was performed and the vessel used;

(4) The extent of the area surveyed;

(5) The survey method used;

(6) The results of the survey, including a list of any debris removed or a statement from the trawling contractor that no objects were recovered; and

(7) A post-trawling job plot or map showing the trawled area.

132 Pipeline Decommissioning
§ 250.1750 When may I decommission a pipeline in place?

You may decommission a pipeline in place when the Regional Supervisor determines that the pipeline does not constitute a hazard (obstruction) to navigation and commercial fishing operations, unduly interfere with other uses of the OCS, or have adverse environmental effects.

§ 250.1751 How do I decommission a pipeline in place?

You must do the following to decommission a pipeline in place:

(a) Submit a pipeline decommissioning application in triplicate to the Regional Supervisor for approval. Your application must be accompanied by payment of the service fee listed in § 250.125. Your application must include the following information:

(1) Reason for the operation;

(2) Proposed decommissioning procedures;

(3) Length (feet) of segment to be decommissioned; and

(4) Length (feet) of segment remaining.

(b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical;

(c) Flush the pipeline;

(d) Fill the pipeline with seawater;

(e) Cut and plug each end of the pipeline;

(f) Bury each end of the pipeline at least 3 feet below the seafloor or cover each end with protective concrete mats, if required by the Regional Supervisor; and

(g) Remove all pipeline valves and other fittings that could unduly interfere with other uses of the OCS.

§ 250.1752 How do I remove a pipeline?

Before removing a pipeline, you must:

(a) Submit a pipeline removal application in triplicate to the Regional Supervisor for approval. Your application must be accompanied by payment of the service fee listed in § 250.125. Your application must include the following information:

(1) Proposed removal procedures;

(2) If the Regional Supervisor requires it, a description, including anchor pattern(s), of the vessel(s) you will use to remove the pipeline;

(3) Length (feet) to be removed;

(4) Length (feet) of the segment that will remain in place;

(5) Plans for transportation of the removed pipe for disposal or salvage;

(6) Plans to protect archaeological and sensitive biological features during removal operations, including a brief assessment of the environmental impacts of the removal operations and procedures and mitigation measures that you will take to minimize such impacts; and

(7) Projected removal schedule and duration.

(b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical; and

(c) Flush the pipeline.

§ 250.1753 After I decommission a pipeline, what information must I submit?

Within 30 days after you decommission a pipeline, you must submit a written report to the Regional Supervisor that includes the following:

(a) A summary of the decommissioning operation including the date it was completed;

(b) A description of any mitigation measures you took; and

(c) A statement signed by your authorized representative that certifies that the pipeline was decommissioned according to the approved application.

§ 250.1754 When must I remove a pipeline decommissioned in place?

You must remove a pipeline decommissioned in place if the Regional Supervisor determines that the pipeline is an obstruction.

R Subpart R [Reserved]
Subpart S Safety and Environmental Management Systems (SEMS)
§ 250.1900 Must I have a SEMS program?

You must develop, implement, and maintain a safety and environmental management system (SEMS) program. Your SEMS program must address the elements described in § 250.1902, American Petroleum Institute's Recommended Practice for Development of a Safety and Environmental Management Program for Offshore Operations and Facilities(API Recommended Practice 75; incorporated by reference, see § 250.198), and other requirements as identified in this subpart.

(a) If there are any conflicts between the requirements of this subpart and API Recommended Practice 75; COS-2-01, COS-2-03, or COS-2-04; or ISO/IEC 17011 (incorporated by reference, see § 250.198), you must follow the requirements of this subpart.

(b) Nothing in this subpart affects safety or other matters under the jurisdiction of the Coast Guard.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20440, Apr. 5, 2013; 91 FR 35362, June 10, 2026]

§ 250.1901 What is the goal of my SEMS program?

The goal of your SEMS program is to promote safety and environmental protection by ensuring all personnel aboard a facility are complying with the policies and procedures identified in your SEMS.

(a) To accomplish this goal, you must ensure that your SEMS program identifies, addresses, and manages safety, environmental hazards, and impacts during the design, construction, start-up, operation (including, but not limited to, drilling and decommissioning), inspection, and maintenance of all new and existing facilities, including mobile offshore drilling units (MODUs) when attached to the seabed and Department of the Interior (DOI) regulated pipelines.

(b) All personnel involved with your SEMS program must be trained to have the skills and knowledge to perform their assigned duties.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20440, Apr. 5, 2013]

§ 250.1902 What must I include in my SEMS program?

You must have a properly documented SEMS program in place and make it available to BSEE upon request as required by § 250.1924(b).

(a) Your SEMS program must meet the minimum criteria outlined in this subpart, including the following SEMS program elements:

(1) General (see § 250.1909)

(2) Safety and Environmental Information (see § 250.1910)

(3) Hazards Analysis (see § 250.1911)

(4) Management of Change (see § 250.1912)

(5) Operating Procedures (see § 250.1913)

(6) Safe Work Practices (see § 250.1914)

(7) Training (see § 250.1915)

(8) Mechanical Integrity (Assurance of Quality and Mechanical Integrity of Critical Equipment) (see § 250.1916)

(9) Pre-startup Review (see § 250.1917)

(10) Emergency Response and Control (see § 250.1918)

(11) Investigation of Incidents (see § 250.1919)

(12) Auditing (Audit of Safety and Environmental Management Program Elements) (see § 250.1920)

(13) Recordkeeping (Records and Documentation) and additional BSEE requirements (see § 250.1928)

(14) Stop Work Authority (SWA) (see § 250.1930)

(15) Ultimate Work Authority (UWA) (see § 250.1931)

(16) Employee Participation Plan (EPP) (see § 250.1932)

(17) Reporting Unsafe Working Conditions (see § 250.1933).

(b) You must include a job safety analysis (JSA) for OCS activities identified or discussed in your SEMS program (see § 250.1911).

(c) Your SEMS program must meet or exceed the standards of safety and environmental protection of API Recommended Practice 75 (incorporated by reference, see § 250.198).

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20440, Apr. 5, 2013; 91 FR 35362, June 10, 2026]

§ 250.1903 Acronyms and definitions.

Definitions listed in this section apply to this subpart and supersede definitions in API Recommended Practice 75, Appendices D and E; COS-2-01, COS-2-03, and COS-2-04; and ISO/IEC 17011 (incorporated by reference, see § 250.198).

(a) Acronyms used frequently in this subpart have the following meanings:

AB means Accreditation Body,

ASP means Audit Service Provider,

CAP means Corrective Action Plan,

COS means Center for Offshore Safety,

EPP means Employee Participation Plan,

ISO means International Organization for Standardization,

JSA means Job Safety Analysis,

MODU means Mobile Offshore Drilling Unit,

OCS means Outer Continental Shelf,

SEMS means Safety and Environmental Management Systems,

SWA means Stop Work Authority,

USCG means United States Coast Guard, and

UWA means Ultimate Work Authority.

(b) Terms used in this subpart are listed alphabetically as follows:

Accreditation Body (AB) means a BSEE-approved independent third-party organization that assesses and accredits ASPs.

Audit Service Provider (ASP) means an independent third-party organization that demonstrates competence to conduct SEMS audits in accordance with the requirements of this subpart.

Corrective Action Plan (CAP) means a scheduled plan to correct deficiencies identified during an audit and that is developed by an operator following the issuance of an audit report.

Personnel means direct employee(s) of the operator and contracted workers.

Ultimate Work Authority (UWA) means the authority assigned to an individual or position to make final decisions relating to activities and operations on the facility.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20440, Apr. 5, 2013; 91 FR 35362, June 10, 2026]

§ 250.1904 Special instructions.

(a) For purposes of this subpart, each and every reference in COS-2-01, COS-2-03, and COS-2-04 (incorporated by reference, see § 250.198) to the term deepwater means the entire OCS, including all water depths.

(b) The BSEE does not incorporate by reference any requirement that you must be a COS member company. For purposes of this subpart, each and every reference in COS-2-01, COS-2-03, and COS-2-04 to the phrase COS member company(ies) means you, whether or not you are a COS member.

(c) For purposes of this subpart, each and every reference in the relevant sections of COS-2-01, COS-2-03, and COS-2-04 (incorporated by reference, see § 250.198) to the Center for Offshore Safety or COS means accreditation body or AB.

(d) For purposes of this subpart, each and every reference in ISO/IEC 17011 (incorporated by reference, see § 250.198) to conformity assessment body (CAB) means ASP.

[78 FR 20441, Apr. 5, 2013, as amended at 91 FR 35362, June 10, 2026]

§§ 250.1905-250.1908 [Reserved]
§ 250.1909 What are management's general responsibilities for the SEMS program?

You, through your management, must require that the program elements discussed in API Recommended Practice 75 (incorporated by reference, see § 250.198) and in this subpart are properly documented and are available at field and office locations, as appropriate for each program element. You, through your management, are responsible for the development, support, continued improvement, and overall success of your SEMS program. Specifically you, through your management, must:

(a) Establish goals and performance measures, demand accountability for implementation, and provide necessary resources for carrying out an effective SEMS program.

(b) Appoint management representatives who are responsible for establishing, implementing and maintaining an effective SEMS program.

(c) Designate specific management representatives who are responsible for reporting to management on the performance of the SEMS program.

(d) At intervals specified in the SEMS program and at least annually, review the SEMS program to determine if it continues to be suitable, adequate and effective (by addressing the possible need for changes to policy, objectives, and other elements of the program in light of program audit results, changing circumstances and the commitment to continual improvement) and document the observations, conclusions and recommendations of that review.

(e) Develop and endorse a written description of your safety and environmental policies and organizational structure that define responsibilities, authorities, and lines of communication required to implement the SEMS program.

(f) Utilize personnel with expertise in identifying safety hazards, environmental impacts, optimizing operations, developing safe work practices, developing training programs and investigating incidents.

(g) Ensure that facilities are designed, constructed, maintained, monitored, and operated in a manner compatible with applicable industry codes, consensus standards, and generally accepted practice as well as in compliance with all applicable governmental regulations.

(h) Ensure that management of safety hazards and environmental impacts is an integral part of the design, construction, maintenance, operation, and monitoring of each facility.

(i) Ensure that suitably trained and qualified personnel are employed to carry out all aspects of the SEMS program.

(j) Ensure that the SEMS program is maintained and kept up to date by means of periodic audits to ensure effective performance.

[76 FR 64462, Oct. 18, 2011, as amended at 91 FR 35362, June 10, 2026]

§ 250.1910 What safety and environmental information is required?

(a) You must require that SEMS program safety and environmental information be developed and maintained for any facility that is subject to the SEMS program.

(b) SEMS program safety and environmental information must include:

(1) Information that provides the basis for implementing all SEMS program elements, including the requirements of hazard analysis (§ 250.1911);

(2) process design information including, as appropriate, a simplified process flow diagram and acceptable upper and lower limits, where applicable, for items such as temperature, pressure, flow and composition; and

(3) mechanical design information including, as appropriate, piping and instrument diagrams; electrical area classifications; equipment arrangement drawings; design basis of the relief system; description of alarm, shutdown, and interlock systems; description of well control systems; and design basis for passive and active fire protection features and systems and emergency evacuation procedures.

§ 250.1911 What hazards analysis criteria must my SEMS program meet?

You must ensure that a hazards analysis (facility level) and a JSA (operations/task level) are developed and implemented for all of your facilities and activities identified or discussed in your SEMS. You must document and maintain a current analysis for each operation covered by this section for the life of the operation at the facility. You must update the analysis when an internal audit is conducted to ensure that it is consistent with your facility's current operations.

(a) Hazards analysis (facility level). The hazards analysis must be appropriate for the complexity of the operation and must identify, evaluate, and manage the hazards involved in the operation.

(1) The hazards analysis must address the following:

(i) Hazards of the operation;

(ii) Previous incidents related to the operation you are evaluating, including any incident in which you were issued an Incident of Noncompliance or a civil or criminal penalty;

(iii) Control technology applicable to the operation your hazards analysis is evaluating; and

(iv) A qualitative evaluation of the possible safety and health effects on employees, and potential impacts to the human and marine environments, which may result if the control technology fails.

(2) The hazards analysis must be performed by a person(s) with experience in the operations being evaluated. These individuals also need to be experienced in the hazards analysis methodologies being employed.

(3) You should assure that the recommendations in the hazards analysis are resolved and that the resolution is documented.

(4) A single hazards analysis can be performed to fulfill the requirements for simple and nearly identical facilities, such as well jackets and single well caissons. You can apply this single hazards analysis to simple and nearly identical facilities after you verify that any site-specific deviations are addressed in each of your SEMS program elements.

(b) JSA. You must ensure a JSA is prepared, conducted, and approved for OCS activities that are identified or discussed in your SEMS program. The JSA is a technique used to identify risks to personnel associated with their job activities. The JSAs are also used to determine the appropriate mitigation measures needed to reduce job risks to personnel. The JSA must include all personnel involved with the job activity.

(1) You must ensure that your JSA identifies, analyzes, and records:

(i) The steps involved in performing a specific job;

(ii) The existing or potential safety, health, and environmental hazards associated with each step; and

(iii) The recommended action(s) and/or procedure(s) that will eliminate or reduce these hazards, the risk of a workplace injury or illness, or environmental impacts.

(2) The immediate supervisor of the crew performing the job onsite must conduct the JSA, sign the JSA, and ensure that all personnel participating in the job understand and sign the JSA.

(3) The individual you designate as being in charge of the facility must approve and sign all JSAs before personnel start the job.

(4) If a particular job is conducted on a recurring basis, and if the parameters of these recurring jobs do not change, then the person in charge of the job may decide that a JSA for each individual job is not required. The parameters you must consider in making this determination include, but are not limited to, changes in personnel, procedures, equipment, and environmental conditions associated with the job.

(c) All personnel, which includes contractors, must be trained in accordance with the requirements of § 250.1915. You must also verify that contractors are trained in accordance with § 250.1915 prior to performing a job.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20441, Apr. 5, 2013]

§ 250.1912 What criteria for management of change must my SEMS program meet?

(a) You must develop and implement written management of change procedures for modifications associated with the following:

(1) Equipment,

(2) Operating procedures,

(3) Personnel changes (including contractors),

(4) Materials, and

(5) Operating conditions.

(b) Management of change procedures do not apply to situations involving replacement in kind (such as, replacement of one component by another component with the same performance capabilities).

(c) You must review all changes prior to their implementation.

(d) The following items must be included in your management of change procedures:

(1) The technical basis for the change;

(2) Impact of the change on safety, health, and the coastal and marine environments;

(3) Necessary time period to implement the change; and

(4) Management approval procedures for the change.

(e) Employees, including contractors whose job tasks will be affected by a change in the operation, must be informed of, and trained in, the change prior to startup of the process or affected part of the operation; and

(f) If a management of change results in a change in the operating procedures of your SEMS program, such changes must be documented and dated.

§ 250.1913 What criteria for operating procedures must my SEMS program meet?

(a) You must develop and implement written operating procedures that provide instructions for conducting safe and environmentally sound activities involved in each operation addressed in your SEMS program. These procedures must include the job title and reporting relationship of the person or persons responsible for each of the facility's operating areas and address the following:

(1) Initial startup;

(2) Normal operations;

(3) All emergency operations (including but not limited to medical evacuations, weather-related evacuations and emergency shutdown operations);

(4) Normal shutdown;

(5) Startup following a turnaround, or after an emergency shutdown;

(6) Bypassing and flagging out-of-service equipment;

(7) Safety and environmental consequences of deviating from your equipment operating limits and steps required to correct or avoid this deviation;

(8) Properties of, and hazards presented by, the chemicals used in the operations;

(9) Precautions you will take to prevent the exposure of chemicals used in your operations to personnel and the environment. The precautions must include control technology, personal protective equipment, and measures to be taken if physical contact or airborne exposure occurs;

(10) Raw materials used in your operations and the quality control procedures you used in purchasing these raw materials;

(11) Control of hazardous chemical inventory; and

(12) Impacts to the human and marine environment identified through your hazards analysis.

(b) Operating procedures must be accessible to all employees involved in the operations.

(c) Operating procedures must be reviewed at the conclusion of specified periods and as often as necessary to assure they reflect current and actual operating practices, including any changes made to your operations.

(d) You must develop and implement safe and environmentally sound work practices for identified hazards during operations and the degree of hazard presented.

(e) Review of and changes to the procedures must be documented and communicated to responsible personnel.

§ 250.1914 What criteria must be documented in my SEMS program for safe work practices and contractor selection?

Your SEMS program must establish and implement safe work practices designed to minimize the risks associated with operations, maintenance, modification activities, and the handling of materials and substances that could affect safety or the environment. Your SEMS program must also document contractor selection criteria. When selecting a contractor, you must obtain and evaluate information regarding the contractor's safety record and environmental performance. You must ensure that contractors have their own written safe work practices. Contractors may adopt appropriate sections of your SEMS program. You and your contractor must document an agreement on appropriate contractor safety and environmental policies and practices before the contractor begins work at your facilities.

(a) A contractor is anyone performing work for you. However, these requirements do not apply to contractors providing domestic services to you or other contractors. Domestic services include janitorial work, food and beverage service, laundry service, housekeeping, and similar activities.

(b) You must document that your contracted employees are knowledgeable and experienced in the work practices necessary to perform their job in a safe and environmentally sound manner. Documentation of each contracted employee's expertise to perform his/her job and a copy of the contractor's safety policies and procedures must be made available to the operator and BSEE upon request.

(c) Your SEMS program must include procedures and verification for selecting a contractor as follows:

(1) Your SEMS program must have procedures that verify that contractors are conducting their activities in accordance with your SEMS program.

(2) You are responsible for making certain that contractors have the skills and knowledge to perform their assigned duties and are conducting these activities in accordance with the requirements in your SEMS program.

(3) You must make the results of your verification for selecting contractors available to BSEE upon request.

(d) Your SEMS program must include procedures and verification that contractor personnel understand and can perform their assigned duties for activities such as, but not limited to:

(1) Installation, maintenance, or repair of equipment;

(2) Construction, startup, and operation of your facilities;

(3) Turnaround operations;

(4) Major renovation; or

(5) Specialty work.

(e) You must:

(1) Perform periodic evaluations of the performance of contract employees that verifies they are fulfilling their obligations, and

(2) Maintain a contractor employee injury and illness log for 2 years related to the contractor's work in the operation area, and include this information on Form BSEE-0131.

(f) You must inform your contractors of any known hazards at the facility they are working on including, but not limited to fires, explosions, slips, trips, falls, other injuries, and hazards associated with lifting operations.

(g) You must develop and implement safe work practices to control the presence, entrance, and exit of contract employees in operation areas.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20441, Apr. 5, 2013]

§ 250.1915 What training criteria must be in my SEMS program?

Your SEMS program must establish and implement a training program so that all personnel are trained in accordance with their duties and responsibilities to work safely and are aware of potential environmental impacts. Training must address such areas as operating procedures (§ 250.1913), safe work practices (§ 250.1914), emergency response and control measures (§ 250.1918), SWA (§ 250.1930), UWA (§ 250.1931), EPP (§ 250.1932), reporting unsafe working conditions (§ 250.1933), and how to recognize and identify hazards and how to construct and implement JSAs (§ 250.1911). You must document your instructors' qualifications. Your SEMS program must address:

(a) Initial training for the basic well-being of personnel and protection of the environment, and ensure that persons assigned to operate and maintain the facility possess the required knowledge and skills to carry out their duties and responsibilities, including startup and shutdown.

(b) Periodic training to maintain understanding of, and adherence to, the current operating procedures, using periodic drills, to verify adequate retention of the required knowledge and skills.

(c) Communication requirements to ensure that personnel will be informed of and trained as outlined in this section whenever a change is made in any of the areas in your SEMS program that impacts their ability to properly understand and perform their duties and responsibilities. Training and/or notice of the change must be given before personnel are expected to operate the facility.

(d) How you will verify that the contractors are trained in the work practices necessary to understand and perform their jobs in a safe and environmentally sound manner in accordance with all provisions of this section.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20441, Apr. 5, 2013]

§ 250.1916 What criteria for mechanical integrity must my SEMS program meet?

You must develop and implement written procedures that provide instructions to ensure the mechanical integrity and safe operation of equipment through inspection, testing, and quality assurance. The purpose of mechanical integrity is to ensure that equipment is fit for service. Your mechanical integrity program must encompass all equipment and systems used to prevent or mitigate uncontrolled releases of hydrocarbons, toxic substances, or other materials that may cause environmental or safety consequences. These procedures must address the following:

(a) The design, procurement, fabrication, installation, calibration, and maintenance of your equipment and systems in accordance with the manufacturer's design and material specifications.

(b) The training of each employee involved in maintaining your equipment and systems so that your employees can implement your mechanical integrity program.

(c) The frequency of inspections and tests of your equipment and systems. The frequency of inspections and tests must be in accordance with BSEE regulations and meet the manufacturer's recommendations. Inspections and tests can be performed more frequently if determined to be necessary by prior operating experience.

(d) The documentation of each inspection and test that has been performed on your equipment and systems. This documentation must identify the date of the inspection or test; include the name and position, and the signature of the person who performed the inspection or test; include the serial number or other identifier of the equipment on which the inspection or test was performed; include a description of the inspection or test performed; and the results of the inspection test.

(e) The correction of deficiencies associated with equipment and systems that are outside the manufacturer's recommended limits. Such corrections must be made before further use of the equipment and system.

(f) The installation of new equipment and constructing systems. The procedures must address the application for which they will be used.

(g) The modification of existing equipment and systems. The procedures must ensure that they are modified for the application for which they will be used.

(h) The verification that inspections and tests are being performed. The procedures must be appropriate to ensure that equipment and systems are installed consistent with design specifications and the manufacturer's instructions.

(i) The assurance that maintenance materials, spare parts, and equipment are suitable for the applications for which they will be used.

§ 250.1917 What criteria for pre-startup review must be in my SEMS program?

Your SEMS program must require that the commissioning process include a pre-startup safety and environmental review for new and significantly modified facilities that are subject to this subpart to confirm that the following criteria are met:

(a) Construction and equipment are in accordance with applicable specifications.

(b) Safety, environmental, operating, maintenance, and emergency procedures are in place and are adequate.

(c) Safety and environmental information is current.

(d) Hazards analysis recommendations have been implemented as appropriate.

(e) Training of operating personnel has been completed.

(f) Programs to address management of change and other elements of this subpart are in place.

(g) Safe work practices are in place.

§ 250.1918 What criteria for emergency response and control must be in my SEMS program?

Your SEMS program must require that emergency response and control plans are in place and are ready for immediate implementation. These plans must be validated by drills carried out in accordance with a schedule defined by the SEMS training program (§ 250.1915). The SEMS emergency response and control plans must include:

(a) Emergency Action Plan that assigns authority and responsibility to the appropriate qualified person(s) at a facility for initiating effective emergency response and control, addressing emergency reporting and response requirements, and complying with all applicable governmental regulations;

(b) Emergency Control Center(s) designated for each facility with access to the Emergency Action Plans, oil spill contingency plan, and other safety and environmental information (§ 250.1910); and

(c) Training and Drills incorporating emergency response and evacuation procedures conducted periodically for all personnel (including contractor's personnel), as required by the SEMS training program (§ 250.1915). Drills must be based on realistic scenarios conducted periodically to exercise elements contained in the facility or area emergency action plan. An analysis and critique of each drill must be conducted to identify and correct weaknesses.

§ 250.1919 What criteria for investigation of incidents must be in my SEMS program?

To learn from incidents and help prevent similar incidents, your SEMS program must establish procedures for investigation of all incidents with serious safety or environmental consequences and require investigation of incidents that are determined by facility management or BSEE to have possessed the potential for serious safety or environmental consequences. Incident investigations must be initiated as promptly as possible, with due regard for the necessity of securing the incident scene and protecting people and the environment. Incident investigations must be conducted by personnel knowledgeable in the process involved, investigation techniques, and other specialties that are relevant or necessary.

(a) The investigation of an incident must address the following:

(1) The nature of the incident;

(2) The factors (human or other) that contributed to the initiation of the incident and its escalation/control; and

(3) Recommended changes identified as a result of the investigation.

(b) A corrective action program must be established based on the findings of the investigation in order to analyze incidents for common root causes. The corrective action program must:

(1) Retain the findings of investigations for use in the next hazard analysis update or audit;

(2) Determine and document the response to each finding to ensure that corrective actions are completed; and

(3) Implement a system whereby conclusions of investigations are distributed to similar facilities and appropriate personnel within their organization.

§ 250.1920 What are the auditing requirements for my SEMS program?

(a) Your SEMS program must be audited by an accredited ASP according to the requirements of this subpart and API Recommended Practice 75, Section 12 (incorporated by reference, see § 250.198). The audit process must also meet or exceed the criteria in Sections 9.1 through 9.8 of Requirements for Third-party SEMS Auditing and Certification of Deepwater Operations COS-2-03 (incorporated by reference, see § 250.198) or its equivalent. Additionally, the audit team lead must be an employee, representative, or agent of the ASP, and must not have any affiliation with the operator. The remaining team members may be chosen from your personnel and those of the ASP. The audit must be comprehensive and include all elements of your SEMS program. It must also identify safety and environmental performance deficiencies.

(b) Your audit plan and procedures must meet or exceed all of the recommendations included in API Recommended Practice 75 section 12 (incorporated by reference, see § 250.198) and include information on how you addressed those recommendations. You must specifically address the following items:

(1) Section 12.1 General.

(2) Section 12.2 Scope.

(3) Section 12.3 Audit Coverage.

(4) Section 12.4 Audit Plan. You must submit your written Audit Plan to BSEE at least 30 days before the audit. BSEE reserves the right to modify the list of facilities that you propose to audit.

(5) Section 12.5 Audit Frequency. You must have your SEMS program audited by an ASP within 2 years after initial implementation and every 3 years thereafter. The 3-year auditing cycle begins on the start date of each comprehensive audit (including the initial implementation audit) and ends on the start date of your next comprehensive audit. For exploratory drilling operations taking place on the Arctic OCS, you must conduct an audit, consisting of an onshore portion and an offshore portion, including all related infrastructure, once per year for every year in which drilling is conducted.

(6) Section 12.6 Audit Team. Your audits must be performed by an ASP as described in § 250.1921. You must include the ASP's qualifications in your audit plan.

(c) You must submit an audit report of the audit findings, observations, deficiencies identified, and conclusions to BSEE within 60 days of the audit completion date. For exploratory drilling operations taking place on the Arctic OCS, you must submit an audit report of the audit findings, observations, deficiencies and conclusions for the onshore portion of your audit no later than March 1 in any year in which you plan to drill, and for the offshore portion of your audit, within 30 days of the close of the audit.

(d) You must provide BSEE with a copy of your CAP for addressing the deficiencies identified in your audit within 60 days of the audit completion date. Your CAP must include the name and job title of the personnel responsible for correcting the identified deficiency(ies). The BSEE will notify you as soon as practicable after receipt of your CAP if your proposed schedule is not acceptable or if the CAP does not effectively address the audit findings. For exploratory drilling operations taking place on the Arctic OCS, you must provide BSEE with a copy of your CAP for addressing deficiencies or nonconformities identified in the onshore portion of the audit no later than March 1 in any year in which you plan to drill, and for the offshore portion of your audit, within 30 days of the close of the audit.

(e) BSEE may verify that you undertook the corrective actions and that these actions effectively address the audit findings.

(f) For exploratory drilling operations taking place on the Arctic OCS, during the offshore portion of each audit, 100 percent of the facilities operated must be audited while drilling activities are underway. You must start and close the offshore portion of the audit for each facility within 30 days after the first spudding of the well or entry into an existing wellbore for any purpose from that facility.

(g) For exploratory drilling operations taking place on the Arctic OCS, if BSEE determines that the CAP or progress toward implementing the CAP is not satisfactory, BSEE may order you to shut down all or part of your operations.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20442, Apr. 5, 2013; 81 FR 36151, June 6, 2016; 81 FR 46563, July 15, 2016; 91 FR 35362, June 10, 2026]

§ 250.1921 What qualifications must the ASP meet?

(a) The ASP must meet or exceed the qualifications, competency, and training criteria contained in Section 3 and Sections 6 through 10 of Qualification and Competence Requirements for Audit Teams and Auditors Performing Third-party SEMS Audits of Deepwater Operations, COS-2-01, (incorporated by reference, see § 250.198) or its equivalent;

(b) The ASP must be accredited by a BSEE-approved AB; and

(c) The ASP must perform an audit in accordance with 250.1920(a).

[78 FR 20442, Apr. 5, 2013, as amended at 91 FR 35362, June 10, 2026]

§ 250.1922 What qualifications must an AB meet?

(a) In order for BSEE to approve an AB, the organization must satisfy the requirements of the International Organization for Standardization's (ISO/IEC 17011) Conformity assessment—General requirements for accreditation bodies accrediting conformity assessment bodies, First Edition 2004-09-01; Corrected Version 2005-02-15 (incorporated by reference, see § 250.198) or its equivalent.

(1) The AB must have an accreditation process that meets or exceeds the requirements contained in Section 6 of Requirements for Accreditation of Audit Service Providers Performing SEMS Audits and Certification of Deepwater Operations, COS-2-04 (incorporated by reference, see § 250.198) or its equivalent, and other requirements specified in this subpart. Organizations requesting approval must submit documentation to BSEE describing the process for assessing an ASP for accreditation and approving, maintaining, and withdrawing the accreditation of an ASP. Requests for approval must be sent to DOI/BSEE, ATTN: Chief, Office of Offshore Regulatory Programs, 381 Elden Street, HE-3314, Herndon, VA 20170.

(2) An AB may be subject to BSEE audits and other requirements deemed necessary to verify compliance with the accreditation requirements.

(b) An AB must have procedures in place to avoid conflicts of interest with the ASP and make such information available to BSEE upon request.

[78 FR 20442, Apr. 5, 2013, as amended at 91 FR 35362, June 10, 2026]

§ 250.1923 [Reserved]
§ 250.1924 How will BSEE determine if my SEMS program is effective?

(a) The BSEE, or its authorized representative, may evaluate or visit your facility(ies) to determine whether your SEMS program is in place, addresses all required elements, is effective in protecting worker safety and health and the environment, and preventing incidents. The BSEE, or its authorized representative, may evaluate any and all aspects of your SEMS program as outlined in this subpart. These evaluations or visits may be random and may be based upon your performance or that of your contractors.

(b) For the evaluations, you must make the following available to BSEE upon request:

(1) Your SEMS program;

(2) Your audit team's qualifications;

(3) The SEMS audits conducted of your program;

(4) Documents or information relevant to whether you have addressed and corrected the deficiencies of your audit; and

(5) Other relevant documents or information.

(c) During the site visit BSEE may verify that:

(1) Personnel are following your SEMS program,

(2) You can explain and demonstrate the procedures and policies included in your SEMS program; and

(3) You can produce evidence to support the implementation of your SEMS program.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20442, Apr. 5, 2013]

§ 250.1925 May BSEE direct me to conduct additional audits?

(a) The BSEE may direct you to have an ASP audit of your SEMS program if BSEE identifies safety or non-compliance concerns based on the results of our inspections and evaluations, or as a result of an event. This BSEE-directed audit is in addition to the regular audit required by § 250.1920. Alternatively, BSEE may conduct an audit.

(1) If BSEE directs you to have an ASP audit, you are responsible for all of the costs associated with the audit, and

(i) The ASP must meet the requirements of §§ 250.1920 and 250.1921 of this subpart.

(ii) You must submit an audit report of the audit findings, observations, deficiencies identified, and conclusions to BSEE within 60 days of the audit completion date.

(2) If BSEE conducts the audit, BSEE will provide you with a report of the audit findings, observations, deficiencies identified, and conclusions as soon as practicable.

(b) You must provide BSEE a copy of your CAP for addressing the deficiencies identified in the BSEE-directed audit within 60 days of the audit completion date. Your CAP must include the name and job title of the personnel responsible for correcting the identified deficiency(ies). The BSEE will notify you as soon as practicable after receipt of your CAP if your proposed schedule is not acceptable or if the CAP does not effectively address the audit findings.

[78 FR 20442, Apr. 5, 2013]

§ 250.1926 [Reserved]
§ 250.1927 What happens if BSEE finds shortcomings in my SEMS program?

If BSEE determines that your SEMS program is not in compliance with this subpart we may initiate one or more of the following enforcement actions:

(a) Issue an Incident(s) of Noncompliance;

(b) Assess civil penalties; or

(c) Initiate probationary or disqualification procedures from serving as an OCS operator.

§ 250.1928 What are my recordkeeping and documentation requirements?

(a) Your SEMS program procedures must ensure that records and documents are maintained for a period of 6 years, except as provided below. You must document and keep all SEMS audits for 6 years and make them available to BSEE upon request. You must maintain a copy of all SEMS program documents at an onshore location.

(b) For JSAs, the person in charge of the job must document the results of the JSA in writing and must ensure that records are kept onsite for 30 days. In the case of a MODU, records must be kept onsite for 30 days or until you release the MODU, whichever comes first. You must retain these records for 2 years and make them available to BSEE upon request.

(c) You must document and date all management of change provisions as specified in § 250.1912. You must retain these records for 2 years and make them available to BSEE upon request.

(d) You must keep your injury/illness log for 2 years and make them available to BSEE upon request.

(e) You must keep all evaluations completed on contractor's safety policies and procedures for 2 years and make them available to BSEE upon request.

(f) For SWA, you must document all training and reviews required by § 250.1930(e). You must ensure that these records are kept onsite for 30 days. In the case of a MODU, records must be kept onsite for 30 days or until you release the MODU, whichever comes first. You must retain these records for 2 years and make them available to BSEE upon request.

(g) For EPP, you must document your employees' participation in the development and implementation of the SEMS program. You must retain these records for 2 years and make them available to BSEE upon request.

(h) You must keep all records in an orderly manner, readily identifiable, retrievable and legible, and include the date of any and all revisions.

[76 FR 64462, Oct. 18, 2011, as amended at 78 FR 20442, Apr. 5, 2013]

§ 250.1929 What are my responsibilities for submitting OCS performance measure data?

You must submit Form BSEE-0131 on an annual basis by March 31st. The form must be broken down quarterly, reporting the previous calendar year's data.

§ 250.1930 What must be included in my SEMS program for SWA?

(a) Your SWA procedures must ensure the capability to immediately stop work that is creating imminent risk or danger. These procedures must grant all personnel the responsibility and authority, without fear of reprisal, to stop work or decline to perform an assigned task when an imminent risk or danger exists. Imminent risk or danger means any condition, activity, or practice in the workplace that could reasonably be expected to cause:

(1) Death or serious physical harm; or

(2) Significant environmental harm to:

(i) Land;

(ii) Air; or

(iii) Mineral deposits, marine, coastal, or human environment.

(b) The person in charge of the conducted work is responsible for ensuring the work is stopped in an orderly and safe manner. Individuals who receive a notification to stop work must comply with that direction immediately.

(c) Work may be resumed when the individual on the facility with UWA determines that the imminent risk or danger does not exist or no longer exists. The decision to resume activities must be documented in writing as soon as practicable.

(d) You must include SWA procedures and expectations as a standard statement in all JSAs.

(e) You must conduct training on your SWA procedures as part of orientations for all new personnel who perform activities on the OCS. Additionally, the SWA procedures must be reviewed during all meetings focusing on safety on facilities subject to this subpart.

[78 FR 20443, Apr. 5, 2013]

§ 250.1931 What must be included in my SEMS program for UWA?

(a) Your SEMS program must have a process to identify the individual with the UWA on your facility(ies). You must designate this individual taking into account all applicable USCG regulations that deal with designating a person in charge of an OCS facility. Your SEMS program must clearly define who is in charge at all times. In the event that multiple facilities, including a MODU, are attached and working together or in close proximity to one another to perform an OCS operation, your SEMS program must identify the individual with the UWA over the entire operation, including all facilities.

(b) You must ensure that all personnel clearly know who has UWA and who is in charge of a specific operation or activity at all times, including when that responsibility shifts to a different individual.

(c) The SEMS program must provide that if an emergency occurs that creates an imminent risk or danger to the health or safety of an individual, the public, or to the environment (as specified in § 250.1930(a)), the individual with the UWA is authorized to pursue the most effective action necessary in that individual's judgment for mitigating and abating the conditions or practices causing the emergency.

[78 FR 20443, Apr. 5, 2013]

§ 250.1932 What are my EPP requirements?

(a) Your management must consult with their employees on the development, implementation, and modification of your SEMS program.

(b) Your management must develop a written plan of action regarding how your appropriate employees, in both your offices and those working on offshore facilities, will participate in your SEMS program development and implementation.

(c) Your management must ensure that employees have access to sections of your SEMS program that are relevant to their jobs.

[78 FR 20443, Apr. 5, 2013]

§ 250.1933 What procedures must be included for reporting unsafe working conditions?

(a) Your SEMS program must include procedures for all personnel to report unsafe working conditions in accordance with § 250.193. These procedures must take into account applicable USCG reporting requirements for unsafe working conditions.

(b) You must post a notice at the place of employment in a visible location frequently visited by personnel that contains the reporting information in § 250.193.

[78 FR 20443, Apr. 5, 2013]

PART 251 GEOLOGICAL AND GEOPHYSICAL (G&G) EXPLORATIONS OF THE OUTER CONTINENTAL SHELF

Authority: 31 U.S.C. 9701, 43 U.S.C. 1334.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§ 251.1 Definitions.

Terms used in this part have the following meaning:

Act means the Outer Continental Shelf Lands Act (OCSLA), as amended (43 U.S.C. 1331 et seq.).

Analyzed geological information means data collected under a permit or a lease that have been analyzed. Analysis may include, but is not limited to, identification of lithologic and fossil content, core analyses, laboratory analyses of physical and chemical properties, well logs or charts, results from formation fluid tests, and descriptions of hydrocarbon occurrences or hazardous conditions.

Archaeological interest means capable of providing scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics through the application of scientific or scholarly techniques, such as controlled observation, contextual measurements, controlled collection, analysis, interpretation, and explanation.

Archaeological resources mean any material remains of human life or activities that are at least 50 years of age and of archaeological interest.

Coastal environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the productivity, state, condition, and quality of the terrestrial ecosystem from the shoreline inward to the boundaries of the coastal zone.

Coastal Zone means the coastal waters (including the lands therein and thereunder) and the adjacent shorelands (including the waters therein and thereunder), strongly influenced by each other and in proximity to the shorelines of the several coastal States and extends seaward to the outer limit of the U.S. territorial sea.

Coastal Zone Management Act means the Coastal Zone Management Act of 1972, as amended (16 U.S.C. 1451 et seq.).

Data means facts, statistics, measurements, or samples that have not been analyzed, processed, or interpreted.

Deep stratigraphic test means drilling that involves the penetration into the sea bottom of more than 500 feet (152 meters).

Director means the Director of the Bureau of Safety and Environmental Enforcement, U.S. Department of the Interior, or a subordinate authorized to act on the Director's behalf.

Exploration means the commercial search for oil, gas, and sulphur. Activities classified as exploration include, but are not limited to:

(1) Geological and geophysical marine and airborne surveys where magnetic, gravity, seismic reflection, seismic refraction, gas sniffers, coring, or other systems are used to detect or imply the presence of oil, gas, or sulphur; and

(2) Any drilling, whether on or off a geological structure.

Geological and geophysical scientific research means any oil, gas, or sulphur related investigation conducted in the OCS for scientific and/or research purposes. Geological, geophysical, and geochemical data and information gathered and analyzed are made available to the public for inspection and reproduction at the earliest practicable time. The term does not include commercial geological or geophysical exploration or research.

Geological exploration means exploration that uses geological and geochemical techniques (e.g., coring and test drilling, well logging, and bottom sampling) to produce data and information on oil, gas, and sulphur resources in support of possible exploration and development activities. The term does not include geological scientific research.

Geological information means geological or geochemical data that have been analyzed, processed, or interpreted.

Geophysical data means measurements that have not been processed or interpreted.

Geophysical exploration means exploration that utilizes geophysical techniques (e.g., gravity, magnetic, electromagnetic, or seismic) to produce data and information on oil, gas, and sulphur resources in support of possible exploration and development activities. The term does not include geophysical scientific research.

Geophysical information means geophysical data that have been processed or interpreted.

Governor means the Governor of a State or the person or entity lawfully designated to exercise the powers granted to a Governor pursuant to the Act.

Human environment means the physical, social, and economic components, conditions, and factors which interactively determine the state, condition, and quality of living conditions, employment, and health of those affected, directly or indirectly, by activities occurring on the OCS.

Hydrocarbon occurrence means the direct or indirect detection during drilling operations of any liquid or gaseous hydrocarbons by examination of well cuttings, cores, gas detector readings, formation fluid tests, wireline logs, or by any other means. The term does not include background gas, minor accumulations of gas, or heavy oil residues on cuttings and cores.

Interpreted geological information means knowledge, often in the form of schematic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of geological data and analyzed and processed geologic information.

Interpreted geophysical information means knowledge, often in the form of seismic cross sections, 3-dimensional representations, and maps, developed by determining the geological significance of geophysical data and processed geophysical information.

Lease means an agreement which is issued under section 8 or maintained under section 6 of the Act and which authorizes exploration for, and development and production of, minerals or the area covered by that authorization, whichever is required by the context.

Lessee means a person who has entered into, or is the BOEM approved assignee of, a lease with the United States to explore for, develop, and produce the leased minerals. The term “lessee” also includes an owner of operating rights.

Marine environment means the physical, atmospheric, and biological components, conditions, and factors that interactively determine the quality of the marine ecosystem in the coastal zone and in the OCS.

Material remains mean physical evidence of human habitation, occupation, use, or activity, including the site, location, or context in which such evidence is situated.

Minerals mean oil, gas, sulphur, geopressured-geothermal and associated resources, and all other minerals which are authorized by an Act of Congress to be produced from public lands as defined in section 103 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1702).

Notice means a written statement of intent to conduct geological or geophysical scientific research related to oil, gas, and sulphur in the OCS other than under a permit.

Oil, gas, and sulphur mean oil, gas, sulphur, geopressured-geothermal, and associated resources.

Outer Continental Shelf (OCS) means all submerged lands lying seaward and outside the area of lands beneath navigable waters as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301), and of which the subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Permit means the contract or agreement, other than a lease, issued pursuant to this part, under which a person acquires the right to conduct on the OCS, in accordance with appropriate statutes, regulations, and stipulations:

(1) Geological exploration for mineral resources;

(2) Geophysical exploration for mineral resources;

(3) Geological scientific research; or

(4) Geophysical scientific research.

Permittee means the person authorized by a permit issued pursuant to this part to conduct activities on the OCS.

Person means a citizen or national of the United States; an alien lawfully admitted for permanent residence in the United States as defined in section 8 U.S.C. 1101(a)(20); a private, public, or municipal corporation organized under the laws of the United States or of any State or territory thereof; and associations of such citizens, nationals, resident aliens, or private, public, or municipal corporations, States, or political subdivisions of States or anyone operating in a manner provided for by treaty or other applicable international agreements. The term does not include Federal agencies.

Processed geological or geophysical information means data collected under a permit and later processed or reprocessed. Processing involves changing the form of data so as to facilitate interpretation. Processing operations may include, but are not limited to, applying corrections for known perturbing causes, rearranging or filtering data, and combining or transforming data elements. Reprocessing is the additional processing other than ordinary processing used in the general course of evaluation. Reprocessing operations may include varying identified parameters for the detailed study of a specific problem area. Reprocessing may occur several years after the original processing date. Reprocessing is determined to be completed on the date that the reprocessed information is first available in a useable format for in-house interpretation by BOEM or the permittee, or becomes first available to third parties via sale, trade, license agreement, or other means.

Secretary means the Secretary of the Interior or a subordinate authorized to act on the Secretary's behalf.

Shallow test drilling means drilling into the sea bottom to depths less than those specified in the definition of a deep stratigraphic test.

Significant archaeological resource means those archaeological resources that meet the criteria of significance for eligibility to the National Register of Historic Places as defined in 36 CFR 60.4.

Third Party means any person other than the permittee or a representative of the United States, including all persons who obtain data or information acquired under a permit from the permittee, or from another third party, by sale, trade, license agreement, or other means.

Violation means a failure to comply with any provision of the Act, or a provision of a regulation or order issued under the Act, or any provision of a lease, license, or permit issued under the Act.

You means a person who applies for and/or obtains a permit, or files a Notice to conduct geological or geophysical exploration or scientific research related to oil, gas, and sulphur in the OCS.

§ 251.2 [Reserved]
§ 251.3 Authority and applicability of this part.

BSEE authorizes you to conduct exploration or scientific research activities under this part in accordance with the Act, the regulations in this part, orders of the Director/Regional Director, and other applicable statutes, regulations, and amendments.

(a) This part does not apply to G&G exploration conducted by or on behalf of the lessee on a lease in the OCS. Refer to 30 CFR part 550 if you plan to conduct G&G activities related to oil, gas, or sulphur under terms of a lease.

(b) Federal agencies are exempt from the regulations in this part.

(c) G&G exploration or G&G scientific research related to minerals other than oil, gas, and sulphur is covered by regulations at 30 CFR part 580.

§§ 251.4-251.6 [Reserved]
§ 251.7 Test drilling activities under a permit.

(a) [Reserved]

(b) Deep stratigraphic tests. You must submit to the appropriate BOEM or BSEE Regional Director, at the address in 30 CFR 551.5(d) for BOEM or 30 CFR 254.7 for BSEE, a drilling plan (submitted to BOEM), an environmental report (submitted to BOEM), an Application for Permit to Drill (Form BSEE-0123) (submitted to BSEE), and a Supplemental APD Information Sheet (Form BSEE-0123S) (submitted to BSEE) as follows:

(1) Drilling plan. The drilling plan must include:

(i) The proposed type, sequence, and timetable of drilling activities;

(ii) A description of your drilling rig, indicating the important features with special attention to safety, pollution prevention, oil-spill containment and cleanup plans, and onshore disposal procedures;

(iii) The location of each deep stratigraphic test you will conduct, including the location of the surface and projected bottomhole of the borehole;

(iv) The types of geological and geophysical survey instruments you will use before and during drilling;

(v) Seismic, bathymetric, sidescan sonar, magnetometer, or other geophysical data and information sufficient to evaluate seafloor characteristics, shallow geologic hazards, and structural detail across and in the vicinity of the proposed test to the total depth of the proposed test well; and

(vi) Other relevant data and information that the BOEM Regional Director requires.

(2) Environmental report. The environmental report must include all of the following material:

(i) A summary with data and information available at the time you submitted the related drilling plan. BOEM will consider site-specific data and information developed since the most recent environmental impact statement or other environmental impact analysis in the immediate area. The summary must meet the following requirements:

(A) You must concentrate on the issues specific to the site(s) of drilling activity. However, you only need to summarize data and information discussed in any environmental reports, analyses, or impact statements prepared for the geographic area of the drilling activity.

(B) You must list referenced material. Include brief descriptions and a statement of where the material is available for inspection.

(C) You must refer only to data that are available to BOEM.

(ii) Details about your project such as:

(A) A list and description of new or unusual technologies;

(B) The location of travel routes for supplies and personnel;

(C) The kinds and approximate levels of energy sources;

(D) The environmental monitoring systems; and

(E) Suitable maps and diagrams showing details of the proposed project layout.

(iii) A description of the existing environment. For this section, you must include the following information on the area:

(A) Geology;

(B) Physical oceanography;

(C) Other uses of the area;

(D) Flora and fauna;

(E) Existing environmental monitoring systems; and

(F) Other unusual or unique characteristics that may affect or be affected by the drilling activities.

(iv) A description of the probable impacts of the proposed action on the environment and the measures you propose for mitigating these impacts.

(v) A description of any unavoidable or irreversible adverse effects on the environment that could occur.

(vi) Other relevant data that the BOEM Regional Director requires.

(3) Copies for coastal States. You must submit copies of the drilling plan and environmental report to the BOEM Regional Director for transmittal to the Governor of each affected coastal State and the coastal zone management agency of each affected coastal State that has an approved program under the Coastal Zone Management Act. (The BOEM Regional Director will make the drilling plan and environmental report available to appropriate Federal agencies and the public according to the Department of the Interior's policies and procedures).

(4) Certification of coastal zone management program consistency and State concurrence. When required under an approved coastal zone management program of an affected State, your drilling plan must include a certification that the proposed activities described in the plan comply with enforceable policies of, and will be conducted in a manner consistent with such State's program. The BOEM Regional Director may not approve any of the activities described in the drilling plan unless the State concurs with the consistency certification or the Secretary of Commerce makes the finding authorized by section 307(c)(3)(B)(iii) of the Coastal Zone Management Act.

(5) Protecting archaeological resources. If the BOEM Regional Director believes that an archaeological resource may exist in the area that may be affected by drilling, the BOEM Regional Director will notify you of the need to prepare an archaeological report under 30 CFR 551.7(b)(5).

(i) If the evidence suggests that an archaeological resource may be present, you must:

(A) Locate the site of the drilling so as to not adversely affect the area where the archaeological resources may be, or

(B) Establish to the satisfaction of the BOEM Regional Director that an archaeological resource does not exist or will not be adversely affected by drilling. This must be done by further archaeological investigation, conducted by an archaeologist and a geophysicist, using survey equipment and techniques deemed necessary by the Regional Director. A report on the investigation must be submitted to the BOEM Regional Director for review.

(ii) If the BOEM Regional Director determines that an archaeological resource is likely to be present in the area that may be affected by drilling, and may be adversely affected by drilling, the BOEM Regional Director will notify you immediately. You must take no action that may adversely affect the archaeological resource unless further investigations determine that the resource is not archaeologically significant.

(iii) If you discover any archaeological resource while drilling, you must immediately halt drilling and report the discovery to the BOEM Regional Director. If investigations determine that the resource is significant, the BOEM Regional Director will inform you how to protect it.

(6) Application for permit to drill (APD). Before commencing deep stratigraphic test drilling activities under an approved drilling plan, you must submit an APD and a Supplemental APD Information Sheet (Forms BSEE-0123 and BSEE-0123S) and receive approval. You must comply with all regulations relating to drilling operations in 30 CFR part 250.

(7) Revising an approved drilling plan. Before you revise an approved drilling plan, you must obtain the BOEM Regional Director's approval.

(8) After drilling. When you complete the test activities, you must permanently plug and abandon the boreholes of all deep stratigraphic tests in compliance with 30 CFR part 250. If the tract on which you conducted a deep stratigraphic test is leased to another party for exploration and development, and if the lessee has not disturbed the borehole, BSEE will hold you and not the lessee responsible for problems associated with the test hole.

(9) Deadline for completing a deep stratigraphic test. If your deep stratigraphic test well is within 50 geographic miles of a tract that BOEM has identified for a future lease sale, as listed on the currently approved OCS leasing schedule, you must complete all drilling activities and submit the data and information to the BOEM Regional Director at least 60 days before the first day of the month in which BOEM schedules the lease sale. However, the BOEM Regional Director may extend your permit duration to allow you to complete drilling activities and submit data and information if the extension is in the National interest.

(c)-(d) [Reserved]

§§ 251.8-251.14 [Reserved]
§ 251.15 Authority for information collection.

The Office of Management and Budget has approved the information collection requirements in this part under 44 U.S.C. 3501 et seq. and assigned OMB control number 1014-0025 as it pertains to Application for Permit to Drill (APD, Form BSEE-0123), and Supplemental APD Information Sheet (Form BSEE-0123S). The title of this information collection is “30 CFR Part 250, Application for Permit to Drill (APD, Revised APD) Supplemental APD Information Sheet, and all supporting documents.”

[81 FR 36151, June 6, 2016]

PART 252 OUTER CONTINENTAL SHELF (OCS) OIL AND GAS INFORMATION PROGRAM

Authority: OCS Lands Act, 43 U.S.C. 1331 et seq., as amended, 92 Stat. 629; Freedom of Information Act, 5 U.S.C. 552; § 252.3 also issued under Pub. L. 99-190 making continuing appropriations for Fiscal Year 1986, and for other purposes.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§ 252.1 Purpose.

The purpose of this part is to implement the provisions of section 26 of the Act (43 U.S.C. 1352). This part supplements the procedures and requirements contained in 30 CFR parts 250, 251, 550, and 551 and provides procedures and requirements for the submission of oil and gas data and information resulting from exploration, development, and production operations on the Outer Continental Shelf (OCS) to the Director, Bureau of Safety and Environmental Enforcement (BSEE). In addition, this part establishes procedures for the Director to make available certain information to the Governors of affected States and, upon request, to the executives of affected local governments in accordance with the provisions of the Freedom of Information Act and the Act.

§ 252.2 Definitions.

When used in the regulations in this part, the following terms shall have the following meanings:

Act refers to the Outer Continental Shelf Lands Act, as amended (43 U.S.C. 1331 et seq.).

Affected local government means the principal governing body of a locality which is in an affected State and is identified by the Governor of that State as a locality which will be significantly affected by oil and gas activities on the OCS.

Affected State means, with respect to any program, plan, lease sale, or other activity, proposed, conducted, or approved pursuant to the provisions of the Act, any State:

(1) The laws of which are declared, pursuant to section 4(a)(2)(A) of the Act, to be the law of the United States for the portion of the OCS on which such activity is, or is proposed to be, conducted;

(2) Which is, or is proposed to be, directly connected by transportation facilities to any artificial island or installations and other devices permanently, or temporarily attached to the seabed;

(3) Which is receiving, or in accordance with the proposed activity will receive, oil for processing, refining, or transshipment which was extracted from the OCS and transported directly to such State by means of vessels or by a combination of means including vessels;

(4) Which is designated by the Director as a State in which there is a substantial probability of significant impact on or damage to the coastal, marine, or human environment, or a State in which there will be significant changes in the social, governmental, or economic infrastructure, resulting from the exploration, development, and production of oil and gas anywhere on the OCS; or

(5) In which the Director finds that because of such activity there is, or will be, a significant risk of serious damage, due to factors such as prevailing winds and currents, to the marine or coastal environment in the event of any oil spill, blowout, or release of oil or gas from vessels, pipelines, or other transshipment facilities.

Analyzed geological information means data collected under a permit or a lease which have been analyzed. Analysis may include, but is not limited to, identification of lithologic and fossil content, core analyses, laboratory analyses of physical and chemical properties, logs or charts of electrical, radioactive, sonic, and other well logs, and descriptions of hydrocarbon shows or hazardous conditions.

Area adjacent to a State means all of that portion of the OCS included within a planning area if such planning area is bordered by that State. The portion of the OCS in the Navarin Basin Planning Area is deemed to be adjacent to the State of Alaska. The States of New York and Rhode Island are deemed to be adjacent to both the Mid-Atlantic Planning Area and the North Atlantic Planning Area.

Data means facts and statistics or samples which have not been analyzed or processed.

Development means those activities which take place following discovery of oil or natural gas in paying quantities, including geophysical activity, drilling, platform construction, and operation of all onshore support facilities, and which are for the purpose of ultimately producing the oil and gas discovered.

Director means the Director of the Bureau of Safety and Environmental Enforcement (BSEE) of the U.S. Department of the Interior or a designee of the Director.

Exploration means the process of searching for oil and natural gas, including:

(1) Geophysical surveys where magnetic, gravity, seismic, or other systems are used to detect or imply the presence of such oil or natural gas, and

(2) Any drilling, whether on or off known geological structures, including the drilling of a well in which a discovery of oil or natural gas in paying quantities is made and the drilling of any additional delineation well after such discovery which is needed to delineate any reservoir and to enable the lessee to determine whether to proceed with development and production.

Governor means the Governor of a State, or the person or entity designated by, or pursuant to, State law to exercise the powers granted to a Governor pursuant to the Act.

Information, when used without a qualifying adjective, includes analyzed geological information, processed geophysical information, interpreted geological information, and interpreted geophysical information.

Interpreted geological information means knowledge, often in the form of schematic cross sections and maps, developed by determining the geological significance of data and analyzed geological information.

Interpreted geophysical information means knowledge, often in the form of schematic cross sections and maps, developed by determining the geological significance of geophysical data and processed geophysical information.

Lease means any form of authorization which is issued under section 8 or maintained under section 6 of the Act and which authorizes exploration for, and development and production of, oil or natural gas, or the land covered by such authorization, whichever is required by the context.

Lessee means the party authorized by a lease, or an approved assignment thereof, to explore for and develop and produce the leased deposits in accordance with the regulations in 30 CFR part 550, including all parties holding such authority by or through the lessee.

Outer Continental Shelf (OCS) means all submerged lands which lie seaward and outside of the area of lands beneath navigable waters as defined in the Submerged Lands Act (67 Stat. 29) and of which the subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Permittee means the party authorized by a permit issued pursuant to 30 CFR parts 251 and 551 to conduct activities on the OCS.

Processed geophysical information means data collected under a permit or a lease which have been processed. Processing involves changing the form of data so as to facilitate interpretation. Processing operations may include, but are not limited to, applying corrections for known perturbing causes, rearranging or filtering data, and combining or transforming data elements.

Production means those activities which take place after the successful completion of any means for the removal of oil or natural gas, including such removal, field operations, transfer of oil or natural gas to shore, operation monitoring, maintenance, and workover drilling.

Secretary means the Secretary of the Interior or a designee of the Secretary.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36151, June 6, 2016]

§ 252.3 Oil and gas data and information to be provided for use in the OCS Oil and Gas Information Program.

(a) Any permittee or lessee engaging in the activities of exploration for, or development and production of, oil and gas on the OCS shall provide the Director access to all data and information obtained or developed as a result of such activities, including geological data, geophysical data, analyzed geological information, processed and reprocessed geophysical information, interpreted geophysical information, and interpreted geological information. Copies of these data and information and any interpretation of these data and information shall be provided to the Director upon request. No permittee or lessee submitting an interpretation of data or information, where such interpretation has been submitted in good faith, shall be held responsible for any consequence of the use of or reliance upon such interpretation.

(b)(1) Whenever a lessee or permittee provides any data or information, at the request of the Director and specifically for use in the OCS Oil and Gas Information Program in a form and manner of processing which is utilized by the lessee or permittee in the normal conduct of business, the Director shall pay the reasonable cost of reproducing the data and information if the lessee or permittee requests reimbursement. The cost shall be computed and paid in accordance with the applicable provisions of paragraph (e)(1) of this section.

(2) Whenever a lessee or permittee provides any data or information, at the request of the Director and specifically for use in the OCS Oil and Gas Information Program, in a form and manner of processing not normally utilized by the lessee or permittee in the normal conduct of business, the Director shall pay the lessee or permittee, if the lessee or permittee requests reimbursement, the reasonable cost of processing and reproducing the requested data and information. The cost is to be computed and paid in accordance with the applicable provisions of paragraph (e)(2) of this section.

(c) Data or information requested by the Director shall be provided as soon as practicable, but not later than 30 days following receipt of the Director's request, unless, for good reason, the Director authorizes a longer time period for the submission of the requested data or information.

(d) The Director reserves the right to disclose any data or information acquired from a lessee or permittee to an independent contractor or agent for the purpose of reproducing, processing, reprocessing, or interpreting such data or information. When practicable, the Director shall notify the lessee(s) or permittee(s) who provided the data or information of the intent to disclose the data or information to an independent contractor or agent. The Director's notice of intent will afford the permittee(s) or lessee(s) a period of not less than 5 working days within which to comment on the intended action. When the Director so notifies a lessee or permittee of the intent to disclose data or information to an independent contractor or agent, all other owners of such data or information shall be deemed to have been notified of the Director's intent. Prior to any such disclosure, the contractor or agent shall be required to execute a written commitment not to disclose any data or information to anyone without the express consent of the Director, and not to make any disclosure or use of the data or information other than that provided in the contract. Contracts between BSEE and independent contractors shall be available to the lessee(s) or permittee(s) for inspection. In the event of any unauthorized use or disclosure of data or information by the contractor or agent, or by an employee thereof, the responsible contractor or agent or employee thereof shall be liable for penalties pursuant to section 24 of the Act.

(e)(1) After delivery of data or information in accordance with paragraph (b)(1) of this section and upon receipt of a request for reimbursement and a determination by the Director that the requested reimbursement is proper, the lessee or permittee shall be reimbursed for the cost of reproducing the data or information at the lessee's or permittee's lowest rate or at the lowest commercial rate established in the area, whichever is less. Requests for reimbursement must be made within 60 days of the delivery date of the data or information requested under paragraph (b)(1) of this section.

(2) After delivery of data or information in accordance with paragraph (b)(3) of this section, and upon receipt of a request for reimbursement and a determination by the Director that the requested reimbursement is proper, the lessee or permittee shall be reimbursed for the cost of processing or reprocessing and of reproducing the requested data or information. Requests for reimbursement must be made within 60 days of the delivery date of the data or information and shall be for only the costs attributable to processing or reprocessing and reproducing, as distinguished from the costs of data acquisition.

(3) Requests for reimbursement are to contain a breakdown of costs in sufficient detail to allow separation of reproduction, processing, and reprocessing costs from acquisition and other costs.

(f) Each Federal Department or Agency shall provide the Director with any data which it has obtained pursuant to section 11 of the Act and any other information which may be necessary or useful to assist the Director in carrying out the provisions of the Act.

§ 252.4 Summary Report to affected States.

(a) The Director, as soon as practicable after analysis, interpretation, and compilation of oil and gas data and information developed by BSEE or furnished by lessees, permittees, or other government agencies, shall make available to affected States and, upon request, to the executive of any affected local government, a Summary Report of data and information designed to assist them in planning for the onshore impacts of potential OCS oil and gas development and production. The Director shall consult with affected States and other interested parties to define the nature, scope, content, and timing of the Summary Report. The Director may consult with affected States and other interested parties regarding subsequent revisions in the definition of the nature, scope, content, and timing of the Summary Report. The Summary Report shall not contain data or information which the Director determines is exempt from disclosure in accordance with this part. The Summary Report shall not contain data or information the release of which the Director determines would unduly damage the competitive position of the lessee or permittee who provided the data or information which the Director has processed, analyzed, or interpreted during the development of the Summary Report. The Summary Report shall include:

(1) Estimates of oil and gas reserves; estimates of the oil and gas resources that may be found within areas which the Secretary has leased or plans to offer for lease; and when available, projected rates and volumes of oil and gas to be produced from leased areas;

(2) Magnitude of the approximate projections and timing of development, if and when oil or gas, or both, is discovered;

(3) Methods of transportation to be used, including vessels and pipelines and approximate location of routes to be followed; and

(4) General location and nature of near-shore and onshore facilities expected to be utilized.

(b) When the Director determines that significant changes have occurred in the information contained in a Summary Report, the Director shall prepare and make available the new or revised information to each affected State, and, upon request, to the executive of any affected local government.

§ 252.5 Information to be made available to affected States.

(a) The BOEM Director shall prepare an index of OCS information (see 30 CFR 556.10). The index shall list all relevant actual or proposed programs, plans, reports, environmental impact statements, nominations information, environmental study reports, lease sale information, and any similar type of relevant information, including modifications, comments, and revisions prepared or directly obtained by the Director under the Act. The index shall be sent to affected States and, upon request, to any affected local government. The public shall be informed of the availability of the index.

(b) Upon request, the Director shall transmit to affected States, affected local governments, and the public a copy of any information listed in the index which is subject to the control of BOEM, in accordance with the requirements and subject to the limitations of the Freedom of Information Act (5 U.S.C.552) and implementing regulations. The Director shall not transmit or make available any information which he determines is exempt from disclosure in accordance with this part.

§ 252.6 Freedom of Information Act requirements.

(a) The Director shall make data and information available in accordance with the requirements and subject to the limitations of the Freedom of Information Act (5 U.S.C. 552), the regulations contained in 43 CFR part 2 (Records and Testimony), the requirements of the Act, and the regulations contained in 30 CFR parts 250 and 550 (Oil and Gas and Sulphur Operations in the Outer Continental Shelf) and 30 CFR parts 251 and 551 (Geological and Geophysical Explorations of the Outer Continental Shelf).

(b) Except as provided in § 252.7 or in 30 CFR parts 250, 251, 550, and 551, no data or information determined by the Director to be exempt from public disclosure under paragraph (a) of this section shall be provided to any affected State or be made available to the executive of any affected local government or to the public unless the lessee, or the permittee and all persons to whom such permittee has sold such data or information under promise of confidentiality, agree to such action.

§ 252.7 Privileged and proprietary data and information to be made available to affected States.

(a)(1) The Governor of any affected State may designate an appropriate State official to inspect, at a regional location which the Director shall designate, any privileged or proprietary data or information received by the Director regarding any activity in an area adjacent to such State, except that no such inspection shall take place prior to the sale of a lease covering the area in which such activity was conducted.

(2)(i) Except as provided for in 30 CFR 250.197, 30 CFR 550.197, and 30 CFR 551.14, no privileged or proprietary data or information will be transmitted to any affected State unless the lessee who provided the privileged or proprietary data or information agrees in writing to the transmittal of the data or information.

(ii) Except as provided for in 30 CFR 250.197, 30 CFR 550.197, and 30 CFR 551.14, no privileged or proprietary data or information will be transmitted to any affected State unless the permittee and all persons to whom the permittee has sold the data or information under promise of confidentiality agree in writing to the transmittal of the data or information.

(3) Knowledge obtained by a State official who inspects data or information under paragraph (a)(1) or who receives data or information under paragraph (a)(2) of this section shall be subject to the requirements and limitations of the Freedom of Information Act (5 U.S.C. 552), the regulations contained in 43 CFR part 2 (Records and Testimony), the Act (92 Stat. 629), the regulations contained in 30 CFR parts 250 and 550 (Oil and Gas and Sulphur Operations in the Outer Continental Shelf), the regulations contained in 30 CFR parts 251 and 551 (Geological and Geophysical Explorations of the Outer Continental Shelf), and the regulations contained in 30 CFR parts 252 and 552 (Outer Continental Shelf Oil and Gas Information Program).

(4) Prior to the transmittal of any privileged or proprietary data or information to any State, or the grant of access to a State official to such data or information, the Secretary shall enter into a written agreement with the Governor of the State in accordance with section 26(e) of the Act (43 U.S.C. 1352). In that agreement the State shall agree, as a condition precedent to receiving or being granted access to such data or information to: (i) Protect and maintain the confidentiality of privileged or proprietary data and information in accordance with the laws and regulations listed in paragraph (a)(3) of this section;

(ii) Waive the defenses as set forth in paragraph (b)(2) of this section; and

(iii) Hold the United States harmless from any violations of the agreement to protect the confidentiality of privileged or proprietary data or information by the State or its employees or contractors.

(b)(1) Whenever any employee of the Federal Government or of any State reveals in violation of the Act or of the provisions of the regulations implementing the Act, privileged or proprietary data or information obtained pursuant to the regulations in this chapter, the lessee or permittee who supplied such information to the Director or any other Federal official, and any person to whom such lessee or permittee has sold such data or information under the promise of confidentiality, may commence a civil action for damages in the appropriate district court of the United States against the Federal Government or such State, as the case may be. Any Federal or State employee who is found guilty of failure to comply with any of the requirements of this section shall be subject to the penalties described in section 24 of the Act (43 U.S.C. 1350).

(2) In any action commenced against the Federal Government or a State pursuant to paragraph (b)(1) of this section, the Federal Government or such State, as the case may be, may not raise as a defense any claim of sovereign immunity, or any claim that the employee who revealed the privileged or proprietary data or information which is the basis of such suit was acting outside the scope of the person's employment in revealing such data or information.

(c) If the Director finds that any State cannot or does not comply with the conditions described in the agreement entered into pursuant to paragraph (a)(4) of this section, the Director shall thereafter withhold transmittal and deny access for inspection of privileged or proprietary data or information to such State until the Director finds that such State can and will comply with those conditions.

253 PART 253 [RESERVED]

PART 254 OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE

Authority: 33 U.S.C. 1321.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Subpart A General
§ 254.1 Who must submit an oil spill response plan (OSRP)?

(a) If you are the owner or operator of an oil handling, storage, or transportation facility, and it is located seaward of the coast line, you must submit an oil spill response plan (OSRP) to BSEE for approval. Your OSRP must demonstrate that you can respond quickly and effectively whenever oil is discharged from your facility. Refer to § 254.6 for the definitions of oil, facility, and coast line if you have any doubts about whether to submit a plan.

(b) You must maintain a current OSRP for an abandoned facility until you physically remove or dismantle the facility or until the Chief, Oil Spill Preparedness Division (OSPD) notifies you in writing that a plan is no longer required.

(c) Owners or operators of offshore pipelines carrying essentially dry gas do not need to submit a plan. You must, however, submit a plan for a pipeline that carries:

(1) Oil;

(2) Condensate that has been injected into the pipeline; or

(3) Gas and naturally occurring condensate.

(d) If you are in doubt as to whether you must submit a plan for an offshore facility or pipeline, you should check with the Chief, OSPD.

(e) If your facility is located landward of the coast line, but you believe your facility is sufficiently similar to OCS facilities that it should be regulated by BSEE, you may contact the Chief, OSPD, offer to accept BSEE jurisdiction over your facility, and request that BSEE seek from the agency with jurisdiction over your facility a relinquishment of that jurisdiction.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36151, June 6, 2016]

§ 254.2 When must I submit an OSRP?

(a) You must submit, and BSEE must approve, an OSRP that covers each facility located seaward of the coast line before you may use that facility. To continue operations, you must operate the facility in compliance with the OSRP.

(b) Despite the provisions of paragraph (a) of this section, you may operate your facility after you submit your OSRP while BSEE reviews it for approval. To operate a facility without an approved OSRP, you must certify in writing to the Chief, OSPD that you have the capability to respond, to the maximum extent practicable, to a worst case discharge or a substantial threat of such a discharge. The certification must show that you have ensured by contract, or other means approved by the Chief, OSPD, the availability of private personnel and equipment necessary to respond to the discharge. Verification from the organization(s) providing the personnel and equipment must accompany the certification. BSEE will not allow you to operate a facility for more than 2 years without an approved OSRP.

[81 FR 36151, June 6, 2016]

§ 254.3 May I cover more than one facility in my OSRP?

(a) Your OSRP may be for a single lease or facility or a group of leases or facilities. All the leases or facilities in your plan must have the same owner or operator (including affiliates) and must be located in the same BSEE Region (see definition of Regional OSRP in § 254.6).

(b) Regional OSRPs must address all the elements required for an OSRP in subpart B, or subpart D of this part, as appropriate.

(c) When developing a Regional OSRP, you may group leases or facilities subject to the approval of the Chief, OSPD, for the purposes of:

(1) Calculating response times;

(2) Determining quantities of response equipment;

(3) Conducting oil-spill trajectory analyses;

(4) Determining worst case discharge scenarios; and

(5) Identifying areas of special economic and environmental importance that may be impacted and the strategies for their protection.

(d) The Chief, OSPD, may specify how to address the elements of a Regional OSRP. The Chief, OSPD, also may require that Regional OSRPs contain additional information if necessary for compliance with appropriate laws and regulations.

[81 FR 36151, June 6, 2016]

§ 254.4 May I reference other documents in my OSRP?

You may reference information contained in other readily accessible documents in your OSRP. Examples of documents that you may reference are the National Contingency Plan (NCP), Area Contingency Plan (ACP), BSEE or BOEM environmental documents, and Oil Spill Removal Organization (OSRO) documents that are readily accessible to the Chief, OSPD. You must ensure that the Chief, OSPD, possesses or is provided with copies of all OSRO documents you reference. You should contact the Chief, OSPD, if you want to know whether a reference is acceptable.

[81 FR 36152, June 6, 2016]

§ 254.5 General response plan requirements.

(a) The OSRP must provide for response to an oil spill from the facility. You must immediately carry out the provisions of the OSRP whenever there is a release of oil from the facility. You must also carry out the training, equipment testing, and periodic drills described in the OSRP, and these measures must be sufficient to ensure the safety of the facility and to mitigate or prevent a discharge or a substantial threat of a discharge.

(b) The OSRP must be consistent with the National Contingency Plan and the appropriate Area Contingency Plan(s).

(c) Nothing in this part relieves you from taking all appropriate actions necessary to immediately abate the source of a spill and remove any spills of oil.

(d) In addition to the requirements listed in this part, you must provide any other information the Chief, OSPD, requires for compliance with appropriate laws and regulations.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

§ 254.6 Definitions.

For the purposes of this part:

Adverse weather conditions means, for the purposes of this part, weather conditions found in the operating area that make it difficult for response equipment and personnel to clean up or remove spilled oil or hazardous substances. These conditions include, but are not limited to: fog, inhospitable water and air temperatures, wind, sea ice, extreme cold, freezing spray, snow, currents, sea states, and extended periods of low light. Adverse weather conditions do not refer to conditions under which it would be dangerous or impossible to respond to a spill, such as a hurricane.

Arctic OCS means the Beaufort Sea and Chukchi Sea Planning Areas (for more information on these areas, see the Proposed Final OCS Oil and Gas Leasing Program for 2012-2017 (June 2012) at http://www.boem.gov/Oil-and-Gas-Energy-Program/Leasing/Five-Year-Program/2012-2017/Program-Area-Maps/index.aspx).

Area Contingency Plan means an Area Contingency Plan prepared and published under section 311(j) of the Federal Water Pollution Control Act (FWPCA).

Chief, OSPD means the Chief, BSEE Oil Spill Preparedness Division or designee.

Coast line means the line of ordinary low water along that portion of the coast which is in direct contact with the open sea and the line marking the seaward limit of inland waters.

Discharge means any emission (other than natural seepage), intentional or unintentional, and includes, but is not limited to, spilling, leaking, pumping, pouring, emitting, emptying, or dumping.

District Manager means the BSEE officer with authority and responsibility for a district within a BSEE Region.

Facility means any structure, group of structures, equipment, or device (other than a vessel) which is used for one or more of the following purposes: Exploring for, drilling for, producing, storing, handling, transferring, processing, or transporting oil. The term excludes deep-water ports and their associated pipelines as defined by the Deepwater Port Act of 1974, but includes other pipelines used for one or more of these purposes. A mobile offshore drilling unit is classified as a facility when engaged in drilling or downhole operations.

Ice intervention practices mean the equipment, vessels, and procedures used to increase oil encounter rates and the effectiveness of spill response techniques and equipment when sea ice is present.

Maximum extent practicable means within the limitations of available technology, as well as the physical limitations of personnel, when responding to a worst case discharge in adverse weather conditions.

National Contingency Plan means the National Oil and Hazardous Substances Pollution Contingency Plan prepared and published under section 311(d) of the FWPCA, (33 U.S.C. 1321(d)) or revised under section 105 of the Comprehensive Environmental Response Compensation and Liability Act (42 U.S.C. 9605).

National Contingency Plan Product Schedule means a schedule of dispersants and other chemical or biological products, maintained by the Environmental Protection Agency, that may be authorized for use on oil discharges in accordance with the procedures found at 40 CFR 300.910.

Oil means oil of any kind or in any form, including but not limited to petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil. This also includes hydrocarbons produced at the wellhead in liquid form (includes distillates or condensate associated with produced natural gas), and condensate that has been separated from a gas prior to injection into a pipeline. It does not include petroleum, including crude oil or any fraction thereof, which is specifically listed or designated as a hazardous substance under paragraphs (A) through (F) of section 101(14) of the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C. 9601) and which is subject to the provisions of that Act. It also does not include animal fats and oils and greases and fish and marine mammal oils, within the meaning of paragraph (2) of section 61(a) of title 13, United States Code, and oils of vegetable origin, including oils from the seeds, nuts, and kernels referred to in paragraph (1)(A) of that section.

Oil spill removal organization (OSRO) means an entity contracted by an owner or operator to provide spill-response equipment and/or manpower in the event of an oil or hazardous substance spill.

OSRP means an Oil Spill Response Plan.

Outer Continental Shelf means all submerged lands lying seaward and outside of the area of lands beneath navigable waters as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301) and of which the subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Owner or operator means, in the case of an offshore facility, any person owning or operating such offshore facility. In the case of any abandoned offshore facility, it means the person who owned such facility immediately prior to such abandonment.

Pipeline means pipe and any associated equipment, appurtenance, or building used or intended for use in the transportation of oil located seaward of the coast line, except those used for deep-water ports. Pipelines do not include vessels such as barges or shuttle tankers used to transport oil from facilities located seaward of the coast line.

Qualified individual means an English-speaking representative of an owner or operator, located in the United States, available on a 24-hour basis, with full authority to obligate funds, carry out removal actions, and communicate with the appropriate Federal officials and the persons providing personnel and equipment in removal operations.

Regional Response Plan means a spill-response plan required by this part which covers multiple facilities or leases of an owner or operator, including affiliates, which are located in the same BSEE Region.

Regional Supervisor means the BSEE official with responsibility and authority for operations or other designated program functions within a BSEE Region.

Remove means containment and cleanup of oil from water and shorelines or the taking of other actions as may be necessary to minimize or mitigate damage to the public health or welfare, including, but not limited to, fish, shellfish, wildlife, public and private property, shorelines, and beaches.

Spill is synonymous with “discharge” for the purposes of this part.

Spill management team means the trained persons identified in an OSRP who staff the organizational structure to manage spill response.

Spill-response coordinator means a trained person charged with the responsibility and designated the commensurate authority for directing and coordinating response operations.

Spill-response operating team means the trained persons who respond to spills through deployment and operation of oil-spill response equipment.

State waters located seaward of the coast line means the belt of the seas measured from the coast line and extending seaward a distance of 3 miles (except the coast of Texas and the Gulf coast of Florida, where the State waters extend seaward a distance of 3 leagues).

You means the owner or the operator as defined in this section.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016; 81 FR 46563, July 15, 2016]

§ 254.7 How do I submit my OSRP to the BSEE?

You must submit the number of copies of your OSRP that the appropriate BSEE regional office requires. If you prefer to use improved information technology such as electronic filing to submit your plan, ask the Chief, OSPD, for further guidance.

(a) Send OSRPs for facilities located seaward of the coast line of Alaska to: Bureau of Safety and Environmental Enforcement, Oil Spill Preparedness Division, Attention: Senior Analyst, 3801 Centerpoint Drive, Suite #500, Anchorage, AK 99503-5823.

(b) Send OSRPs for facilities in the Gulf of America-or Atlantic Ocean to: Bureau of Safety and Environmental Enforcement, Oil Spill Preparedness Division, Attention: GOA Section Supervisor, 1201 Elmwood Park Boulevard, New Orleans, LA 70123-2394.

(c) Send OSRPs for facilities in the Pacific Ocean (except seaward of the coast line of Alaska) to: Bureau of Safety and Environmental Enforcement, Oil Spill Preparedness Division, Attention: Senior Analyst, 760 Paseo Camarillo, Suite 201, Camarillo, CA 93010-6002.

[81 FR 36152, June 6, 2016, as amended at 90 FR 44327, Sept. 15, 2025]

§ 254.8 May I appeal decisions under this part?

See 30 CFR part 290 for instructions on how to appeal any order or decision that we issue under this part.

§ 254.9 Authority for information collection.

(a) The Office of Management and Budget (OMB) has approved the information collection requirements in this part under 44 U.S.C. 3501 et seq. OMB assigned the control number 1014-0007. The title of this information collection is “30 CFR part 254, Oil Spill Response Requirements for Facilities Located Seaward of the Coast line.”

(b) BSEE collects this information to ensure that the owner or operator of an offshore facility is prepared to respond to an oil spill. BSEE uses the information to verify compliance with the mandates of the Oil Pollution Act of 1990 (OPA). The requirement to submit this information is mandatory. No confidential or proprietary information is collected.

(c) An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

(d) Send comments regarding any aspect of the collection of information under this part, including suggestions for reducing the burden, to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

Subpart B Oil-Spill Response Plans for Outer Continental Shelf Facilities
§ 254.20 Purpose.

This subpart describes the requirements for preparing OSRPs for facilities located on the OCS.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

§ 254.21 How must I format my OSRP?

(a) You must divide your OSRP for OCS facilities into the sections specified in paragraph (b) of this section and explained in the other sections of this subpart. The OSRP must have an easily found marker identifying each section. You may use an alternate format if you include a cross reference table to identify the location of required sections. You may use alternate contents if you can demonstrate to the Chief, OSPD that they provide for equal or greater levels of preparedness.

(b) Your OSRP must include:

(1) Introduction and OSRP contents.

(2) Emergency response action plan.

(3) Appendices:

(i) Equipment inventory.

(ii) Contractual agreements.

(iii) Worst case discharge scenario.

(iv) Dispersant use plan.

(v) In situ burning plan.

(vi) Training and drills.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

§ 254.22 What information must I include in the “Introduction and OSRP contents” section?

The “Introduction and OSRP contents” section must provide:

(a) Identification of the facility the OSRP covers, including its location and type;

(b) A table of contents;

(c) A record of changes made to the OSRP; and

(d) A cross-reference table, if needed, because you are using an alternate format for your OSRP.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

§ 254.23 What information must I include in the “Emergency response action plan” section?

The “Emergency response action plan” section is the core of the OSRP. Put information in easy-to-use formats such as flow charts or tables where appropriate. This section must include:

(a) Designation, by name or position, of a trained qualified individual (QI) who has full authority to implement removal actions and ensure immediate notification of appropriate Federal officials and response personnel.

(b) Designation, by name or position, of a trained spill management team available on a 24-hour basis. The team must include a trained spill-response coordinator and alternate(s) who have the responsibility and authority to direct and coordinate response operations on your behalf. You must describe the team's organizational structure as well as the responsibilities and authorities of each position on the spill management team.

(c) Description of a spill-response operating team. Team members must be trained and available on a 24-hour basis to deploy and operate spill-response equipment. They must be able to respond within a reasonable minimum specified time. You must include the number and types of personnel available from each identified labor source.

(d) A planned location for a spill-response operations center and provisions for primary and alternate communications systems available for use in coordinating and directing spill-response operations. You must provide telephone numbers for the response operations center. You also must provide any facsimile numbers and primary and secondary radio frequencies that will be used.

(e) A listing of the types and characteristics of the oil handled, stored, or transported at the facility.

(f) Procedures for the early detection of a spill.

(g) Identification of procedures you will follow in the event of a spill or a substantial threat of a spill. The procedures should show appropriate response levels for differing spill sizes including those resulting from a fire or explosion. These will include, as appropriate:

(1) Your procedures for spill notification. The plan must provide for the use of the oil spill reporting forms included in the Area Contingency Plan or an equivalent reporting form.

(i) Your procedures must include a current list which identifies the following by name or position, corporate address, and telephone number (including facsimile number if applicable):

(A) The qualified individual;

(B) The spill-response coordinator and alternate(s); and

(C) Other spill-response management team members.

(ii) You must also provide names, telephone numbers, and addresses for the following:

(A) OSRO's that the plan cites;

(B) Federal, State, and local regulatory agencies that you must consult to obtain site specific environmental information; and

(C) Federal, State, and local regulatory agencies that you must notify when an oil spill occurs.

(2) Your methods to monitor and predict spill movement;

(3) Your methods to identify and prioritize the beaches, waterfowl, other marine and shoreline resources, and areas of special economic and environmental importance;

(4) Your methods to protect beaches, waterfowl, other marine and shoreline resources, and areas of special economic or environmental importance;

(5) Your methods to ensure that containment and recovery equipment as well as the response personnel are mobilized and deployed at the spill site;

(6) Your methods to ensure that devices for the storage of recovered oil are sufficient to allow containment and recovery operations to continue without interruption;

(7) Your procedures to remove oil and oiled debris from shallow waters and along shorelines and rehabilitating waterfowl which become oiled;

(8) Your procedures to store, transfer, and dispose of recovered oil and oil-contaminated materials and to ensure that all disposal is in accordance with Federal, State, and local requirements; and

(9) Your methods to implement your dispersant use plan and your in situ burning plan.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

§ 254.24 What information must I include in the “Equipment inventory” appendix?

Your “Equipment inventory appendix” must include:

(a) An inventory of spill-response materials and supplies, services, equipment, and response vessels available locally and regionally. You must identify each supplier and provide their locations and telephone numbers.

(b) A description of the procedures for inspecting and maintaining spill-response equipment in accordance with § 254.43.

§ 254.25 What information must I include in the “Contractual agreements” appendix?

Your “Contractual agreements” appendix must furnish proof of any contracts or membership agreements with OSRO's, cooperatives, spill-response service providers, or spill management team members who are not your employees that you cite in the OSRP. To provide this proof, submit copies of the contracts or membership agreements or certify that contracts or membership agreements are in effect. The contract or membership agreement must include provisions for ensuring the availability of the personnel and/or equipment on a 24-hour-per-day basis.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36152, June 6, 2016]

§ 254.26 What information must I include in the “Worst case discharge scenario” appendix?

The discussion of your worst case discharge scenario must include all of the following elements:

(a) The volume of your worst case discharge scenario determined using the criteria in § 254.47. Provide any assumptions made and the supporting calculations used to determine this volume.

(b) An appropriate trajectory analysis specific to the area in which the facility is located. The analysis must identify onshore and offshore areas that a discharge potentially could affect. The trajectory analysis chosen must reflect the maximum distance from the facility that oil could move in a time period that it reasonably could be expected to persist in the environment.

(c) A list of the resources of special economic or environmental importance that potentially could be impacted in the areas identified by your trajectory analysis. You also must state the strategies that you will use for their protection. At a minimum, this list must include those resources of special economic and environmental importance, if any, specified in the appropriate Area Contingency Plan(s).

(d) A discussion of your response to your worst case discharge scenario in adverse weather conditions. This discussion must include:

(1) A description of the response equipment that you will use to contain and recover the discharge to the maximum extent practicable. This description must include the types, location(s) and owner, quantity, and capabilities of the equipment. You also must include the effective daily recovery capacities, where applicable. You must calculate the effective daily recovery capacities using the methods described in § 254.44. For operations at a drilling or production facility, your scenario must show how you will cope with the initial spill volume upon arrival at the scene and then support operations for a blowout lasting 30 days.

(2) A description of the personnel, materials, and support vessels that would be necessary to ensure that the identified response equipment is deployed and operated promptly and effectively. Your description must include the location and owner of these resources as well as the quantities and types (if applicable);

(3) A description of your oil storage, transfer, and disposal equipment. Your description must include the types, location and owner, quantity, and capacities of the equipment; and

(4) An estimation of the individual times needed for:

(i) Procurement of the identified containment, recovery, and storage equipment;

(ii) Procurement of equipment transportation vessel(s);

(iii) Procurement of personnel to load and operate the equipment;

(iv) Equipment loadout (transfer of equipment to transportation vessel(s));

(v) Travel to the deployment site (including any time required for travel from an equipment storage area); and

(vi) Equipment deployment.

(e) In preparing the discussion required by paragraph (d) of this section, you must:

(1) Ensure that the response equipment, materials, support vessels, and strategies listed are suitable, within the limits of current technology, for the range of environmental conditions anticipated at your facility; and

(2) Use standardized, defined terms to describe the range of environmental conditions anticipated and the capabilities of response equipment. Examples of acceptable terms include those defined in American Society for Testing of Materials (ASTM) publication F625-94, Standard Practice for Describing Environmental Conditions Relevant to Spill Control Systems for Use on Water, and ASTM F818-93, Standard Definitions Relating to Spill Response Barriers.

§ 254.27 What information must I include in the “Dispersant use plan” appendix?

Your dispersant use plan must be consistent with the National Contingency Plan Product Schedule and other provisions of the National Contingency Plan and the appropriate Area Contingency Plan(s). The plan must include:

(a) An inventory and a location of the dispersants and other chemical or biological products which you might use on the oils handled, stored, or transported at the facility;

(b) A summary of toxicity data for these products;

(c) A description and a location of any application equipment required as well as an estimate of the time to commence application after approval is obtained;

(d) A discussion of the application procedures;

(e) A discussion of the conditions under which product use may be requested; and

(f) An outline of the procedures you must follow in obtaining approval for product use.

§ 254.28 What information must I include in the “In situ burning plan” appendix?

Your in situ burning plan must be consistent with any guidelines authorized by the National Contingency Plan and the appropriate Area Contingency Plan(s). Your in situ burning plan must include:

(a) A description of the in situ burn equipment including its availability, location, and owner;

(b) A discussion of your in situ burning procedures, including provisions for ignition of an oil spill;

(c) A discussion of environmental effects of an in situ burn;

(d) Your guidelines for well control and safety of personnel and property;

(e) A discussion of the circumstances in which in situ burning may be appropriate;

(f) Your guidelines for making the decision to ignite; and

(g) An outline of the procedures you must follow to obtain approval for an in situ burn.

§ 254.29 What information must I include in the “Training and drills” appendix?

Your “Training and drills” appendix must:

(a) Identify and include the dates of the training provided to members of the spill-response management team and the qualified individual. The types of training given to the members of the spill-response operating team also must be described. The training requirements for your spill management team and your spill-response operating team are specified in § 254.41. You must designate a location where you keep course completion certificates or attendance records for this training.

(b) Describe in detail your plans for satisfying the exercise requirements of § 254.42. You must designate a location where you keep the records of these exercises.

§ 254.30 When must I revise my OSRP?

(a) You must review your OSRP at least every 2 years and submit all resulting modifications to the Chief, OSPD. If this review does not result in modifications, you must inform the Chief, OSPD, in writing that there are no changes.

(b) You must submit revisions to your OSRP for approval within 15 days whenever:

(1) A change occurs which significantly reduces your response capabilities;

(2) A significant change occurs in the worst case discharge scenario or in the type of oil being handled, stored, or transported at the facility;

(3) There is a change in the name(s) or capabilities of the oil spill removal organizations cited in the OSRP; or

(4) There is a significant change to the Area Contingency Plan(s).

(c) The Chief, OSPD, may require that you resubmit your OSRP if the OSRP has become outdated or if numerous revisions have made its use difficult.

(d) The Chief, OSPD, will periodically review the equipment inventories of OSRO's to ensure that sufficient spill removal equipment is available to meet the cumulative needs of the owners and operators who cite these organizations in their OSRPs.

(e) The Chief, OSPD, may require you to revise your OSRP if significant inadequacies are indicated by:

(1) Periodic reviews (described in paragraph (d) of this section);

(2) Information obtained during drills or actual spill responses; or

(3) Other relevant information the Chief, OSPD, obtained.

[81 FR 36152, June 6, 2016]

Subpart C Related Requirements for Outer Continental Shelf Facilities
§ 254.40 Records.

You must make all records of services, personnel, and equipment provided by OSRO's or cooperatives available to any authorized BSEE representative upon request.

§ 254.41 Training your response personnel.

(a) You must ensure that the members of your spill-response operating team who are responsible for operating response equipment attend hands-on training classes at least annually. This training must include the deployment and operation of the response equipment they will use. Those responsible for supervising the team must be trained annually in directing the deployment and use of the response equipment.

(b) You must ensure that the spill-response management team, including the spill-response coordinator and alternates, receives annual training. This training must include instruction on:

(1) Locations, intended use, deployment strategies, and the operational and logistical requirements of response equipment;

(2) Spill reporting procedures;

(3) Oil-spill trajectory analysis and predicting spill movement; and

(4) Any other responsibilities the spill management team may have.

(c) You must ensure that the qualified individual is sufficiently trained to perform his or her duties.

(d) You must keep all training certificates and training attendance records at the location designated in your OSRP for at least 2 years. They must be made available to any authorized BSEE representative upon request.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.42 Exercises for your response personnel and equipment.

(a) You must exercise your entire OSRP at least once every 3 years (triennial exercise). You may satisfy this requirement by conducting separate exercises for individual parts of the OSRP over the 3-year period; you do not have to exercise your entire OSRP at one time.

(b) In satisfying the triennial exercise requirement, you must, at a minimum, conduct:

(1) An annual spill management team tabletop exercise. The exercise must test the spill management team's organization, communication, and decision making in managing a response. You must not reveal the spill scenario to team members before the exercise starts.

(2) An annual deployment exercise of response equipment identified in your OSRP that is staged at onshore locations. You must deploy and operate each type of equipment in each triennial period. However, it is not necessary to deploy and operate each individual piece of equipment.

(3) An annual notification exercise for each facility that is manned on a 24- hour basis. The exercise must test the ability of facility personnel to communicate pertinent information in a timely manner to the qualified individual.

(4) A semiannual deployment exercise of any response equipment which the BSEE Regional Supervisor requires an owner or operator to maintain at the facility or on dedicated vessels. You must deploy and operate each type of this equipment at least once each year. Each type need not be deployed and operated at each exercise.

(c) During your exercises, you must simulate conditions in the area of operations, including seasonal weather variations, to the extent practicable. The exercises must cover a range of scenarios over the 3-year exercise period, simulating responses to large continuous spills, spills of short duration and limited volume, and your worst case discharge scenario.

(d) BSEE will recognize and give credit for any documented exercise conducted that satisfies some part of the required triennial exercise. You will receive this credit whether the owner or operator, an OSRO, or a Government regulatory agency initiates the exercise. BSEE will give you credit for an actual spill response if you evaluate the response and generate a proper record. Exercise documentation should include the following information:

(1) Type of exercise;

(2) Date and time of the exercise;

(3) Description of the exercise;

(4) Objectives met; and

(5) Lessons learned.

(e) All records of spill-response exercises must be maintained for the complete 3-year exercise cycle. Records should be maintained at the facility or at a corporate location designated in the OSRP. Records showing that OSROs and oil spill removal cooperatives have deployed each type of equipment also must be maintained for the 3-year cycle.

(f) You must inform the Chief, OSPD of the date of any exercise required by paragraph (b)(1), (2), or (4) of this section at least 30 days before the exercise. This will allow BSEE personnel the opportunity to witness any exercises.

(g) The Regional Supervisor periodically will initiate unannounced drills to test the spill response preparedness of owners and operators.

(h) The Chief, OSPD may require changes in the frequency or location of the required exercises, equipment to be deployed and operated, or deployment procedures or strategies. The Chief, OSPD may evaluate the results of the exercises and advise the owner or operator of any needed changes in response equipment, procedures, or strategies.

(i) Compliance with the National Preparedness for Response Exercise Program (PREP) Guidelines will satisfy the exercise requirements of this section. Copies of the PREP document may be obtained from the Chief, OSPD.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.43 Maintenance and periodic inspection of response equipment.

(a) You must ensure that the response equipment listed in your OSRP is inspected at least monthly and is maintained, as necessary, to ensure optimal performance.

(b) You must ensure that records of the inspections and the maintenance activities are kept for at least 2 years and are made available to any authorized BSEE representative upon request.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.44 Calculating response equipment effective daily recovery capacities.

(a) You are required by § 254.26(d)(1) to calculate the effective daily recovery capacity of the response equipment identified in your OSRP that you would use to contain and recover your worst case discharge. You must calculate the effective daily recovery capacity of the equipment by multiplying the manufacturer's rated throughput capacity over a 24-hour period by 20 percent. This 20 percent efficiency factor takes into account the limitations of the recovery operations due to available daylight, sea state, temperature, viscosity, and emulsification of the oil being recovered. You must use this calculated rate to determine if you have sufficient recovery capacity to respond to your worst case discharge scenario.

(b) If you want to use a different efficiency factor for specific oil recovery devices, you must submit evidence to substantiate that efficiency factor. Adequate evidence includes verified performance data measured during actual spills or test data gathered according to the provisions of § 254.45(b) and (c).

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.45 Verifying the capabilities of your response equipment.

(a) The Regional Supervisor may require performance testing of any spill-response equipment listed in your OSRP to verify its capabilities if the equipment:

(1) Has been modified;

(2) Has been damaged and repaired; or

(3) Has a claimed effective daily recovery capacity that is inconsistent with data otherwise available to BSEE.

(b) You must conduct any required performance testing of booms in accordance with BSEE-approved test criteria. You may use the document “Test Protocol for the Evaluation of Oil-Spill Containment Booms,” available from BSEE, for guidance. Performance testing of skimmers also must be conducted in accordance with BSEE approved test criteria. You may use the document “Suggested Test Protocol for the Evaluation of Oil Spill Skimmers for the OCS,” available from BSEE, for guidance.

(c) You are responsible for any required testing of equipment performance and for the accuracy of the information submitted.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.46 Whom do I notify if an oil spill occurs?

(a) You must immediately notify the National Response Center (1-800-424-8802) if you observe:

(1) An oil spill from your facility;

(2) An oil spill from another offshore facility; or

(3) An offshore spill of unknown origin.

(b) In the event of a spill of 1 barrel or more from your facility, you must orally notify the Regional Supervisor without delay. You also must report spills from your facility of unknown size but thought to be 1 barrel or more.

(1) If a spill from your facility not originally reported to the Regional Supervisor is subsequently found to be 1 barrel or more, you must then report it without delay.

(2) You must file a written follow up report for any spill from your facility of 1 barrel or more. The Chief, OSPD must receive this confirmation within 15 days after the spillage has been stopped. All reports must include the cause, location, volume, and remedial action taken. Reports of spills of more than 50 barrels must include information on the sea state, meteorological conditions, and the size and appearance of the slick. The Regional Supervisor may require additional information if it is determined that an analysis of the response is necessary.

(c) If you observe a spill resulting from operations at another offshore facility, you must immediately notify the responsible party and the Regional Supervisor.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.47 Determining the volume of oil of your worst case discharge scenario.

You must calculate the volume of oil of your worst case discharge scenario as follows:

(a) For an oil production platform facility, the size of your worst case discharge scenario is the sum of the following:

(1) The maximum capacity of all oil storage tanks and flow lines on the facility. Flow line volume may be estimated; and

(2) The volume of oil calculated to leak from a break in any pipelines connected to the facility considering shutdown time, the effect of hydrostatic pressure, gravity, frictional wall forces and other factors; and

(3) The daily production volume from an uncontrolled blowout of the highest capacity well associated with the facility. In determining the daily discharge rate, you must consider reservoir characteristics, casing/production tubing sizes, and historical production and reservoir pressure data. Your scenario must discuss how to respond to this well flowing for 30 days as required by § 254.26(d)(1).

(b) For exploratory or development drilling operations, the size of your worst case discharge scenario is the daily volume possible from an uncontrolled blowout. In determining the daily discharge rate, you must consider any known reservoir characteristics. If reservoir characteristics are unknown, you must consider the characteristics of any analog reservoirs from the area and give an explanation for the selection of the reservoir(s) used. Your scenario must discuss how to respond to this well flowing for 30 days as required by § 254.26(d)(1).

(c) For a pipeline facility, the size of your worst case discharge scenario is the volume possible from a pipeline break. You must calculate this volume as follows:

(1) Add the pipeline system leak detection time to the shutdown response time.

(2) Multiply the time calculated in paragraph (c)(1) of this section by the highest measured oil flow rate over the preceding 12-month period. For new pipelines, you should use the predicted oil flow rate in the calculation.

(3) Add to the volume calculated in paragraph (c)(2) of this section the total volume of oil that would leak from the pipeline after it is shut in. Calculate this volume by taking into account the effects of hydrostatic pressure, gravity, frictional wall forces, length of pipeline segment, tie-ins with other pipelines, and other factors.

(d) If your facility which stores, handles, transfers, processes, or transports oil does not fall into the categories listed in paragraph (a), (b), or (c) of this section, contact the Chief, OSPD for instructions on the calculation of the volume of your worst case discharge scenario.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

Subpart D Oil-Spill Response Requirements for Facilities Located in State Waters Seaward of the Coast Line
§ 254.50 Spill response plans for facilities located in State waters seaward of the coast line.

Owners or operators of facilities located in State waters seaward of the coast line must submit a spill-response plan to BSEE for approval. You may choose one of three methods to comply with this requirement. The three methods are described in §§ 254.51, 254.52, and 254.53.

§ 254.51 Modifying an existing OCS OSRP.

You may modify an existing response plan covering a lease or facility on the OCS to include a lease or facility in State waters located seaward of the coast line. Since this OSRP would cover more than one lease or facility, it would be considered a Regional Response Plan. You should refer to § 254.3 and contact the appropriate regional BSEE office if you have any questions on how to prepare this Regional Response Plan.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.52 Following the format for an OCS OSRP.

You may develop a response OSRP following the requirements for plans for OCS facilities found in subpart B of this part.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.53 Submitting an OSRP developed under State requirements.

(a) You may submit a response plan to BSEE for approval that you developed in accordance with the laws or regulations of the appropriate State. The OSRP must contain all the elements the State and OPA require and must:

(1) Be consistent with the requirements of the National Contingency Plan and appropriate Area Contingency Plan(s).

(2) Identify a qualified individual and require immediate communication between that person and appropriate Federal officials and response personnel if there is a spill.

(3) Identify any private personnel and equipment necessary to remove, to the maximum extent practicable, a worst case discharge as defined in § 254.47. The plan must provide proof of contractual services or other evidence of a contractual agreement with any OSRO's or spill management team members who are not employees of the owner or operator.

(4) Describe the training, equipment testing, periodic unannounced drills, and response actions of personnel at the facility. These must ensure both the safety of the facility and the mitigation or prevention of a discharge or the substantial threat of a discharge.

(5) Describe the procedures you will use to periodically update and resubmit the plan for approval of each significant change.

(b) Your plan developed under State requirements also must include the following information:

(1) A list of the facilities and leases the plan covers and a map showing their location;

(2) A list of the types of oil handled, stored, or transported at the facility;

(3) Name and address of the State agency to whom the plan was submitted;

(4) Date you submitted the plan to the State;

(5) If the plan received formal approval, the name of the approving organization, the date of approval, and a copy of the State agency's approval letter if one was issued; and

(6) Identification of any regulations or standards used in preparing the plan.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.54 Spill prevention for facilities located in State waters seaward of the coast line.

In addition to your OSRP, you must submit to the Chief, OSPD, a description of the steps you are taking to prevent spills of oil or mitigate a substantial threat of such a discharge. You must identify all State or Federal safety or pollution prevention requirements that apply to the prevention of oil spills from your facility, and demonstrate your compliance with these requirements. You also should include a description of industry safety and pollution prevention standards your facility meets. The Chief, OSPD may prescribe additional equipment or procedures for spill prevention if it is determined that your efforts to prevent spills do not reflect good industry practices.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 254.55 Spill response plans for facilities located in Alaska State waters seaward of the coast line in the Chukchi and Beaufort Seas.

Response plans for facilities conducting exploratory drilling operations from a MODU seaward of the coast line in Alaska State waters in the Chukchi and Beaufort Seas must follow the requirements contained within subpart E of this part, in addition to the other requirements of this subpart. Such response plans must address how the source control procedures selected to comply with State law will be integrated into the planning, training, and exercise requirements of §§ 254.70(a), 254.90(a), and 254.90(c), in the event that the proposed operations do not incorporate the capping stack, cap and flow system, containment dome, and/or other similar subsea and surface devices and equipment and vessels referenced in those sections.

[81 FR 46563, July 15, 2016]

Subpart E Oil-Spill Response Requirements for Facilities Located on the Arctic OCS

Source: 81 FR 46564, July 15, 2016, unless otherwise noted.

§ 254.65 Purpose.

This subpart describes the additional requirements for preparing OSRPs and maintaining oil spill preparedness for facilities conducting exploratory drilling operations from a mobile offshore drilling unit (MODU) on the Arctic OCS.

§§ 254.66-254.69 [Reserved]
§ 254.70 What are the additional requirements for facilities conducting exploratory drilling from a MODU on the Arctic OCS?

In addition to meeting the applicable requirements of this part, your OSRP must:

(a) Describe how the relevant personnel, equipment, materials, and support vessels associated with the capping stack, cap and flow system, containment dome, and other similar subsea and surface devices and equipment and vessels will be integrated into oil spill response incident action planning;

(b) Describe how you will address human factors, such as cold stress and cold related conditions, associated with oil spill response activities in adverse weather conditions and their impacts on decision-making and health and safety; and

(c) Undergo plan-holder review prior to handling, storing, or transporting oil in connection with seasonal exploratory drilling activities, and all resulting modifications must be submitted to the Regional Supervisor. If this review does not result in modifications, you must inform the Regional Supervisor in writing that there are no changes. The requirements of this paragraph (c) are in lieu of the requirements in § 254.30(a).

§§ 254.71-254.79 [Reserved]
§ 254.80 What additional information must I include in the “Emergency response action plan” section for facilities conducting exploratory drilling from a MODU on the Arctic OCS?

In addition to the requirements in § 254.23, you must include the following information in the emergency response action plan section of your OSRP:

(a) A description of your ice intervention practices and how they will improve the effectiveness of the oil spill response options and strategies that are listed in your OSRP in the presence of sea ice. When developing the ice intervention practices for your OSRP, you must consider, at a minimum, the use of specialized tactics, modified response equipment, ice management assist vessels, and technologies for the identification, tracking, containment and removal of oil in ice.

(b) On areas of the Arctic OCS where a planned shore-based response would not satisfy § 254.1(a):

(1) A list of all resources required to ensure an effective offshore-based response capable of operating in adverse weather conditions. This list must include a description of how you will ensure the shortest possible transit times, including but not limited to establishing an offshore resource management capability (e.g., sea-based staging, maintenance, and berthing logistics); and

(2) A list and description of logistics resupply chains, including waste management, that effectively factor in the remote and limited infrastructure that exists in the Arctic and ensure you can adequately sustain all oil spill response activities for the duration of the response. The components of the logistics supply chain include, but are not limited to:

(i) Personnel and equipment transport services;

(ii) Airfields and types of aircraft that can be supported;

(iii) Capabilities to mobilize supplies (e.g., response equipment, fuel, food, fresh water) and personnel to the response sites;

(iv) Onshore staging areas, storage areas that may be used en-route to staging areas, and camp facilities to support response personnel conducting offshore, nearshore and shoreline response; and

(v) Management of recovered fluid and contaminated debris and response materials (e.g., oiled sorbents), as well as waste streams generated at offshore and on-shore support facilities (e.g., sewage, food, and medical).

(c) A description of the system you will use to maintain real-time location tracking for all response resources while operating, transiting, or staging/maintaining such resources during a spill response.

§§ 254.81-254.89 [Reserved]
§ 254.90 What are the additional requirements for exercises of your response personnel and equipment for facilities conducting exploratory drilling from a MODU on the Arctic OCS?

In addition to the requirements in § 254.42, the following requirements apply to exercises for your response personnel and equipment for facilities conducting exploratory drilling from a MODU on the Arctic OCS:

(a) You must incorporate the personnel, materials, and equipment identified in § 254.70(a), the safe working practices identified in § 254.70(b), the ice intervention practices described in § 254.80(a), the offshore-based response requirements in § 254.80(b), and the resource tracking requirements in § 254.80(c) into your spill-response training and exercise activities.

(b) For each season in which you plan to conduct exploratory drilling operations from a MODU on the Arctic OCS, you must notify the Regional Supervisor 60 days prior to handling, storing, or transporting oil.

(c) After the Regional Supervisor receives notice pursuant to § 254.90(b), the Regional Supervisor may direct you to deploy and operate your spill response equipment and/or your capping stack, cap and flow system, and containment dome, and other similar subsea and surface devices and equipment and vessels, as part of announced or unannounced exercises or compliance inspections. For the purposes of this section, spill response equipment does not include the use of blowout preventers, diverters, heavy weight mud to kill the well, relief wells, or other similar conventional well control options.

PART 256 LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF

Authority: 31 U.S.C. 9701, 42 U.S.C. 6213, 43 U.S.C. 1334, Pub. L. 109-432.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Subpart A Outer Continental Shelf Oil, Gas, and Sulphur Management, General
§ 256.1 Purpose.

The purpose of the regulations in 30 CFR part 256 is to establish the procedures under which the Secretary of the Interior (Secretary) will exercise the authority to administer a leasing program for oil, gas and sulphur. The procedures under which the Secretary will exercise the authority to administer a program to grant rights-of-way, are addressed in part 250, subpart J.

§ 256.7 Cross references.

(a) For Bureau of Safety and Environmental Enforcement (BSEE) regulations governing exploration, development and production on leases, see 30 CFR parts 250 and 270.

(b) For BSEE regulations governing the appeal of an order or decision issued under the regulations in this part, see 30 CFR part 290.

(c) For multiple use conflicts, see the Environmental Protection Agency listing of ocean dumping sites—40 CFR part 228.

(d) For related National Oceanic and Atmospheric Administration programs see:

(1) Marine sanctuary regulations, 15 CFR part 922;

(2) Fishermen's Contingency Fund, 50 CFR part 296;

(3) Coastal Energy Impact Program, 15 CFR part 931;

(e) For Coast Guard regulations on the oil spill liability of vessels and operators, see 33 CFR parts 132, 135, and 136.

(f) For Coast Guard regulations on port access routes, see 33 CFR part 164.

(g) For compliance with the National Environmental Policy Act, see 40 CFR parts 1500 through 1508.

(h) For Department of Transportation regulations on offshore pipeline facilities, see 49 CFR part 195.

(i) For Department of Defense regulations on military activities on offshore areas, see 32 CFR part 252.

(j) For Bureau of Ocean Energy Management (BOEM) regulations, see 30 CFR chapter V.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

Subpart B Assignments, Transfers, and Extensions

Source: 76 FR 64462, Oct. 18, 2011, Redesignated at 81 FR 36153, June 6, 2016.

§ 256.70 Extension of lease by drilling or well reworking operations.

The term of a lease shall be extended beyond the primary term so long as drilling or well reworking operations are approved by the Secretary according to the conditions set forth in 30 CFR 250.180.

§ 256.71 Directional drilling.

In accordance with a BOEM-approved exploration plan or development and production plan, a lease may be maintained in force by directional wells drilled under the leased area from surface locations on adjacent or adjoining land not covered by the lease. In such circumstances, drilling shall be considered to have commenced on the leased area when drilling is commenced on the adjacent or adjoining land for the purpose of directional drilling under the leased area through any directional well surfaced on adjacent or adjoining land. Production, drilling or reworking of any such directional well shall be considered production or drilling or reworking operations on the leased area for all purposes of the lease.

§ 256.72 Compensatory payments as production.

If an oil and gas lessee makes compensatory payments and if the lease is not being maintained in force by other production of oil or gas in paying quantities or by other approved drilling or reworking operations, such payments shall be considered as the equivalent of production in paying quantities for all purposes of the lease.

§ 256.73 Effect of suspensions on lease term.

(a) A suspension may extend the term of a lease (see 30 CFR 250.171) with the extension being the length of time the suspension is in effect except as provided in paragraph (b) of this section.

(b) A Directed Suspension does not extend the lease term when the Regional Supervisor directs a suspension because of:

(1) Gross negligence; or

(2) A willful violation of a provision of the lease or governing regulations.

(c) BSEE may issue suspensions for a period of up to 5 years per suspension. The Regional Supervisor will set the length of the suspension based on the conditions of the individual case involved. BSEE may grant consecutive suspensions. For more information on suspension of operations or production refer to the section under the heading “Suspensions” in 30 CFR part 250, subpart A.

Subpart C Termination of Leases

Source: 76 FR 64462, Oct. 18, 2011, Redesignated at 81 FR 36153, June 6, 2016.

§ 256.77 Cancellation of leases.

(a) Any nonproducing lease issued under the act may be cancelled by the authorized officer whenever the lessee fails to comply with any provision of the act or lease or applicable regulations, if such failure to comply continues for 30 days after mailing of notice by registered or certified letter to the lease owner at the owner's record post office address. Any such cancellation is subject to judicial review as provided in section 23(b) of the Act.

(b) Producing leases issued under the Act may be cancelled by the Secretary whenever the lessee fails to comply with any provision of the Act, applicable regulations or the lease only after judicial proceedings as prescribed by section 5(d) of the Act.

(c) Any lease issued under the Act, whether producing or not, shall be canceled by the authorized officer upon proof that it was obtained by fraud or misrepresentation, and after notice and opportunity to be heard has been afforded to the lessee.

(d) Pursuant to section 5(a) of the Act, the Secretary may cancel a lease when:

(1) Continued activity pursuant to such lease would probably cause serious harm or damage to life, property, any mineral, National security or defense, or to the marine, coastal or human environment;

(2) The threat of harm or damage will not disappear or decrease to an acceptable extent within a reasonable period of time; and

(3) The advantages of cancellation outweigh the advantages of continuing such lease or permit in force. Procedures and conditions contained in § 550.182 shall apply as appropriate.

Subpart D Section 6 Leases

Source: 76 FR 64462, Oct. 18, 2011, Redesignated at 81 FR 36153, June 6, 2016.

§ 256.79 Effect of regulations on lease.

(a) All regulations in this part, insofar as they are applicable, shall supersede the provisions of any lease which is maintained under section 6(a) of the Act. However, the provisions of a lease relating to area, minerals, rentals, royalties (subject to sections 6(a) (8) and (9) of the Act), and term (subject to section 6(a)(10) of the Act and, as to sulfur, subject to section 6(b)(2) of the Act) shall continue in effect, and, in the event of any conflict or inconsistency, shall take precedence over these regulations.

(b) A lease maintained under section 6(a) of the Act shall also be subject to all operating and conservation regulations applicable to the OCS. In addition, the regulations relating to geophysical and geological exploratory operations and to pipeline rights-of-way are applicable, to the extent that those regulations are not contrary to or inconsistent with the lease provisions relating to area, the minerals, rentals, royalties and term. The lessee shall comply with any provision of the lease as validated, the subject matter of which is not covered in the regulations in this part.

259-260 PARTS 259-260 [RESERVED]

PART 270 NONDISCRIMINATION IN THE OUTER CONTINENTAL SHELF

Authority: 43 U.S.C. 1863.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§ 270.1 Purpose.

The purpose of this part is to implement the provisions of section 604 of the OCSLA of 1978 which provides that “no person shall, on the grounds of race, creed, color, national origin, or sex, be excluded from receiving or participating in any activity, sale, or employment, conducted pursuant to the provisions of * * * the Outer Continental Shelf Lands Act.”

§ 270.2 Application of this part.

This part applies to any contract or subcontract entered into by a lessee or by a contractor or subcontractor of a lessee after the effective date of these regulations to provide goods, services, facilities, or property in an amount of $10,000 or more in connection with any activity related to the exploration for or development and production of oil, gas, or other minerals or materials in the OCS under the Act.

§ 270.3 Definitions.

As used in this part, the following terms shall have the following meanings:

Contract means any business agreement or arrangement (in which the parties do not stand in the relationship of employer and employee) between a lessee and any person which creates an obligation to provide goods, services, facilities, or property.

Lessee means the party authorized by a lease, grant of right-of-way, or an approved assignment thereof to explore, develop, produce, or transport oil, gas, or other minerals or materials in the OCS pursuant to the Act and this part.

Person means a person or company, including but not limited to, a corporation, partnership, association, joint stock venture, trust, mutual fund, or any receiver, trustee in bankruptcy, or other official acting in a similar capacity for such company.

Subcontract means any business agreement or arrangement (in which the parties do not stand in the relationship of employer and employee) between a lessee's contractor and any person other than a lessee that is in any way related to the performance of any one or more contracts.

§ 270.4 Discrimination prohibited.

No contract or subcontract to which this part applies shall be denied to or withheld from any person on the grounds of race, creed, color, national origin, or sex.

§ 270.5 Complaint.

(a) Whenever any person believes that he or she has been denied a contract or subcontract to which this part applies on the grounds of race, creed, color, national origin, or sex, such person may complain of such denial or withholding to the Regional Director of the OCS Region in which such action is alleged to have occurred. Any complaint filed under this part must be submitted in writing to the appropriate Regional Director not later than 180 days after the date of the alleged unlawful denial of a contract or subcontract which is the basis of the complaint.

(b) The complaint referred to in paragraph (a) of this section shall be accompanied by such evidence as may be available to a person and which is relevant to the complaint including affidavits and other documents.

(c) Whenever any person files a complaint under this part, the Regional Director with whom such complaint is filed shall give written notice of such filing to all persons cited in the complaint no later than 10 days after receipt of such complaint. Such notice shall include a statement describing the alleged incident of discrimination, including the date and the names of persons involved in it.

§ 270.6 Process.

Whenever a Regional Director determines on the basis of any information, including that which may be obtained under § 270.5 of this part, that a violation of or failure to comply with any provision of this subpart probably occurred, the Regional director shall undertake to afford the complainant and the person(s) alleged to have violated the provisions of this part an opportunity to engage in informal consultations, meetings, or any other form of communications for the purpose of resolving the complaint. In the event such communications or consultations result in a mutually satisfactory resolution of the complaint, the complainant and all persons cited in the complaint shall notify the Regional Director in writing of their agreement to such resolution. If either the complainant or the person(s) alleged to have wrongfully discriminated fail to provide such written notice within a reasonable period of time, the Regional Director must proceed in accordance with the provisions of 30 CFR 250, subpart N.

§ 270.7 Remedies.

In addition to the penalties available under 30 CFR part 250, subpart N, the Director may invoke any other remedies available to him or her under the Act or regulations for the lessee's failure to comply with provisions of the Act, regulations, or lease.

PART 280 PROSPECTING FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR ON THE OUTER CONTINENTAL SHELF

Authority: 43 U.S.C. 1334.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

A Subparts A-B [Reserved]
Subpart C Obligations Under This Part
134 Interrupted Activities
§§ 280.20-280.24 [Reserved]
§ 280.25 When may BSEE require me to stop activities under this part?

(a) We may temporarily stop prospecting or scientific research activities under a permit when the Regional Director determines that:

(1) Activities pose a threat of serious, irreparable, or immediate harm. This includes damage to life (including fish and other aquatic life), property, and any minerals (in areas leased or not leased), to the marine, coastal, or human environment, or to an archaeological resource;

(2) You failed to comply with any applicable law, regulation, order or provision of the permit. This would include the required submission of reports, well records or logs, and G&G data and information within the time specified; or

(3) Stopping the activities is in the interest of National security or defense.

(b) The Regional Director will advise you either orally or in writing of the procedures to temporarily stop activities. We will confirm an oral notification in writing and deliver all written notifications by courier or certified/registered mail. You must stop all activities under a permit as soon as you receive an oral or written notification.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 280.26 When may I resume activities?

The Regional Director will advise you when you may start your permit activities again.

§ 280.27 When may BSEE cancel my permit?

The Regional Director may cancel a permit at any time.

(a) If we cancel your permit, the Regional Director will advise you by certified or registered mail 30 days before the cancellation date and will state the reason.

(b) After we cancel your permit, you are still responsible for proper abandonment of any drill site according to the requirements of 30 CFR 251.7(b)(8). You must comply with all other obligations specified in this part or in the permit.

§ 280.28 May I relinquish my permit?

(a) You may relinquish your permit at any time by advising the Bureau of Ocean Energy Management Regional Director by certified or registered mail 30 days in advance.

(b) After you relinquish your permit, you are still responsible for proper abandonment of any drill sites according to the requirements of 30 CFR 251.7(b)(8). You must also comply with all other obligations specified in this part or in the permit.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

D Subparts D-E [Reserved]

281 PART 281 [RESERVED]

PART 282 OPERATIONS IN THE OUTER CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR

Authority: 43 U.S.C. 1334.

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Subpart A General
§ 282.0 Authority for information collection.

(a) The information collection requirements in this part have been approved by the Office of Management and Budget under 44 U.S.C. 3507 and assigned clearance number 1014-0021. The information is being collected to inform the Bureau of Safety and Environmental Enforcement (BSEE) of general mining operations in the Outer Continental Shelf (OCS). The information will be used to ensure that operations are conducted in a safe and environmentally responsible manner in compliance with governing laws and regulations. The requirement to respond is mandatory.

(b) Send comments regarding any aspect of the collection of information under this part, including suggestions for reducing the burden, to: Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 282.1 Purpose and authority.

(a) The Act authorizes the Secretary to prescribe such rules and regulations as may be necessary to carry out the provisions of the Act (43 U.S.C. 1334). The Secretary is authorized to prescribe and amend regulations that the Secretary determines to be necessary and proper in order to provide for the prevention of waste, conservation of the natural resources of the OCS, and the protection of correlative rights therein. In the enforcement of safety, environmental, and conservation laws and regulations, the Secretary is authorized to cooperate with adjacent States and other Departments and Agencies of the Federal Government.

(b) Subject to the supervisory authority of the Secretary, and unless otherwise specified, the regulations in this part shall be administered by the Director of BSEE.

§ 282.2 Scope.

The rules and regulations in this part apply as of their effective date to all operations conducted under a mineral lease for OCS minerals other than oil, gas, or sulphur issued under the provisions of section 8(k) of the Act.

§ 282.3 Definitions.

When used in this part, the following terms shall have the following meaning:

Act means the OCS Lands Act, as amended (43 U.S.C. 1331 et seq.).

Adjacent State means with respect to any activity proposed, conducted, or approved under this part, any coastal State:

(1) That is, or is proposed to be, receiving for processing, refining, or transshipment OCS mineral resources commercially recovered from the seabed;

(2) That is used, or is scheduled to be used, as a support base for prospecting, exploration, testing, or mining activities; or

(3) In which there is a reasonable probability of significant effect on land or water uses from such activity.

Contingency Plan means a plan for action to be taken in emergency situations.

Data means geological and geophysical (G&G) facts and statistics or samples which have not been analyzed, processed, or interpreted.

Development means those activities which take place following the discovery of minerals in paying quantities including geophysical activities, drilling, construction of offshore facilities, and operation of all onshore support facilities, which are for the purpose of ultimately producing the minerals discovered.

Director means the Director of BSEE of the U.S. Department of the Interior or an official authorized to act on the Director's behalf.

Exploration means the process of searching for minerals on a lease including:

(1) Geophysical surveys where magnetic, gravity, seismic, or other systems are used to detect or imply the presence of minerals;

(2) Any drilling including the drilling of a borehole in which the discovery of a mineral other than oil, gas, or sulphur is made and the drilling of any additional boreholes needed to delineate any mineral deposits; and

(3) The taking of sample portions of a mineral deposit to enable the lessee to determine whether to proceed with development and production.

Geological sample means a collected portion of the seabed, the subseabed, or the overlying waters (when obtained for geochemical analysis) acquired while conducting postlease mining activities.

Governor means the Governor of a State or the person or entity designated by, or pursuant to, State law to exercise the power granted to a Governor.

Information means G&G data that have been analyzed, processed, or interpreted.

Lease means one of the following, whichever is required by the context: Any form of authorization which is issued under section 8 or maintained under section 6 of the Acts and which authorizes exploration for, and development and production of, specific minerals; or the area covered by that authorization.

Lessee means the person authorized by a lease, or an approved assignment thereof, to explore for and develop and produce the leased deposits in accordance with the regulations in this chapter. The term includes all parties holding that authority by or through the lessee.

Major Federal action means any action or proposal by the Secretary which is subject to the provisions of section 102(2)(C) of the National Environmental Policy Act (NEPA) (i.e., an action which will have a significant impact on the quality of the human environment requiring preparation of an Environmental Impact Statement (EIS) pursuant to section 102(2)(C) of NEPA).

Marine environment means the physical, atmospheric, and biological components, conditions, and factors which interactively determine the productivity, state, condition, and quality of the marine ecosystem, including the waters of the high seas, the contiguous zone, transitional and intertidal areas, salt marshes, and wetlands within the coastal zone and on the OCS.

Minerals include oil, gas, sulphur, geopressured-geothermal and associated resources, and all other minerals which are authorized by an Act of Congress to be produced from “public lands” as defined in section 103 of the Federal Land Policy and Management Act of 1976.

OCS mineral means any mineral deposit or accretion found on or below the surface of the seabed but does not include oil, gas, or sulphur; salt or sand and gravel intended for use in association with the development of oil, gas, or sulphur; or source materials essential to production of fissionable materials which are reserved to the United States pursuant to section 12(e) of the Act.

Operator means the individual, partnership, firm, or corporation having control or management of operations on the lease or a portion thereof. The operator may be a lessee, designated agent of the lessee, or holder of rights under an approved operating agreement.

Outer Continental Shelf means all submerged lands lying seaward and outside of the area of lands beneath navigable waters as defined in section 2 of Submerged Lands Act (43 U.S.C. 1301) and of which the subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Person means a citizen or national of the United States; an alien lawfully admitted for permanent residency in the United States as defined in 8 U.S.C. 1101(a)(20); a private, public, or municipal corporation organized under the laws of the United States or of any State or territory thereof; an association of such citizens, nationals, resident aliens or private, public, or municipal corporations, States, or political subdivisions of States; or anyone operating in a manner provided for by treaty or other applicable international agreements. The term does not include Federal Agencies.

Secretary means the Secretary of the Interior or an official authorized to act on the Secretary's behalf.

Testing means removing bulk samples for processing tests and feasibility studies and/or the testing of mining equipment to obtain information needed to develop a detailed Mining Plan.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 282.4 [Reserved]
§ 282.5 Disclosure of data and information to the public.

(a) The Director shall make data, information, and samples available in accordance with the requirements and subject to the limitations of the Act, the Freedom of Information Act (5 U.S.C. 552), and the implementing regulations (43 CFR part 2).

(b) Geophysical data, processed G&G information, interpreted G&G information, and other data and information submitted pursuant to the requirements of this part shall not be available for public inspection without the consent of the lessee so long as the lease remains in effect, unless the Director determines that earlier limited release of such information is necessary for the unitization of operations on two or more leases, to ensure proper Mining Plans for a common ore body, or to promote operational safety. When the Director determines that early limited release of data and information is necessary, the data and information shall be shown only to persons with a direct interest in the affected lease(s), unitization agreement, or joint Mining Plan.

(c) Geophysical data, processed geophysical information and interpreted geophysical information collected on a lease with high resolution systems (including, but not limited to, bathymetry, side-scan sonar, subbottom profiler, and magnetometer) in compliance with stipulations or orders concerning protection of environmental aspects of the lease may be made available to the public 60 days after submittal to the Director, unless the lessee can demonstrate to the satisfaction of the Director that release of the information or data would unduly damage the lessee's competitive position.

§ 282.6 Disclosure of data and information to an adjacent State.

(a) Proprietary data, information, and samples submitted to BSEE pursuant to the requirements of this part shall be made available for inspection by representatives of adjacent State(s) upon request by the Governor(s) in accordance with paragraphs (b) and (c) of this section.

(b) Disclosure shall occur only after the Governor has entered into an agreement with the Secretary providing that:

(1) The confidentiality of the information shall be maintained;

(2) In any action commenced against the Federal Government or the State for failure to protect the confidentiality of proprietary information, the Federal Government or the State, as the case may be, may not raise as a defense any claim of sovereign immunity or any claim that the employee who revealed the proprietary information, which is the basis of the suit, was acting outside the scope of the person's employment in revealing the information;

(3) The State agrees to hold the United States harmless for any violation by the State or its employees or contractors of the agreement to protect the confidentiality of proprietary data, information, and samples; and

(c) The data, information, and samples available for inspection by representatives of adjacent State(s) pursuant to an agreement shall be related to leased lands.

§ 282.7 Jurisdictional controversies.

In the event of a controversy between the United States and a State as to whether certain lands are subject to Federal or State jurisdiction, either the Governor of the State or the Secretary may initiate negotiations in an attempt to settle the jurisdictional controversy. With the concurrence of the Attorney General, the Secretary may enter into an agreement with a State with respect to OCS mineral activities and to payment and impounding of rents, royalties, and other sums and with respect to the issuance or nonissuance of new leases pending settlement of the controversy.

Subpart B Jurisdiction and Responsibilities of Director
§ 282.10 Jurisdiction and responsibilities of Director.

Subject to the authority of the Secretary, the following activities are subject to the regulations in this part and are under the jurisdiction of the Director: Exploration, testing, and mining operations together with the associated environmental protection measures needed to permit those activities to be conducted in an environmentally responsible manner; handling, measurement, and transportation of OCS minerals; and other operations and activities conducted pursuant to a lease issued under 30 CFR part 581, or pursuant to a right of use and easement granted under 30 CFR 582.30, by or on behalf of a lessee or the holder of a right of use and easement.

§ 282.11 Director's authority.

(a)-(c) [Reserved]

(d)(1) The Director may approve the consolidation of two or more OCS mineral leases or portions of two or more OCS mineral leases into a single mining unit requested by lessees, or the Director may require such consolidation when the operation of those leases or portions of leases as a single mining unit is in the interest of conservation of the natural resources of the OCS or the prevention of waste. A mining unit may also include all or portions of one or more OCS mineral leases with all or portions of one or more adjacent State leases for minerals in a common orebody. A single unit operator shall be responsible for submission of required Delineation, Testing, and Mining Plans covering OCS mineral operations for an approved mining unit.

(2) Operations such as exploration, testing, and mining activities conducted in accordance with an approved plan on any lease or portion of a lease which is subject to an approved mining unit shall be considered operations on each of the leases that is made subject to the approved mining unit.

(3) Minimum royalty paid pursuant to a Federal lease, which is subject to an approved mining unit, is creditable against the production royalties allocated to that Federal lease during the lease year for which the minimum royalty is paid.

(4) Any OCS minerals produced from State and Federal leases which are subject to an approved mining unit shall be accounted for separately unless a method of allocating production between State and Federal leases has been approved by the Director and the appropriate State official.

§ 282.12 Director's responsibilities.

(a) The Director is responsible for the regulation of activities to assure that all operations conducted under a lease or right of use and easement are conducted in a manner that protects the environment and promotes orderly development of OCS mineral resources. Those activities are to be designed to prevent serious harm or damage to, or waste of, any natural resource (including OCS mineral deposits and oil, gas, and sulphur resources in areas leased or not leased), any life (including fish and other aquatic life), property, or the marine, coastal, or human environment.

(b)-(d) [Reserved]

(e) The Director shall assure that a scheduled onsite compliance inspection of each facility which is subject to regulations in this part is conducted at least once a year. The inspection shall be to determine that the lessee is in compliance with the requirements of the law; provisions of the lease; the approved Delineation, Testing, or Mining Plan; and the regulations in this part. Additional unscheduled onsite inspections shall be conducted without advance notice to the lessee to assure compliance with the provisions of applicable law; the lease; the approved Delineation, Testing, or Mining Plan; and the regulations in this part.

(f)(1) The Director shall, after completion of the technical and environmental evaluations, approve, disapprove, or require modification of the lessee's requests, applications, plans, and notices submitted pursuant to the provisions of this part; issue orders to govern lease operations; and require compliance with applicable provisions of the law, the regulations, the lease, and the approved Delineation, Testing, or Mining Plans. The Director may give oral orders or approvals whenever prior approval is required before the commencement of an operation or activity. Oral orders or approvals given in response to a written request shall be confirmed in writing within 3 working days after issuance of the order or granting of the oral approval.

(2) The Director shall, after completion of the technical and environmental evaluations, approve, disapprove, or require modification, as appropriate, of the design plan, fabrication plan, and installation plan for platforms, artificial islands, and other installations and devices permanently or temporarily attached to the seabed. The approval, disapproval, or requirement to modify such plans may take the form of a condition of granting a right of use and easement under paragraph (a) of this section or as authorized under any lease issued or maintained under the Act.

(g) [Reserved]

(h) The Director may prescribe or approve, in writing or orally, departures from the operating requirements of the regulations of this part when such departures are necessary to facilitate the proper development of a lease; to conserve natural resources; or to protect life (including fish and other aquatic life), property, or the marine, coastal, or human environment.

§ 282.13 Suspension of production or other operations.

(a) The Director may direct the suspension or temporary prohibition of production or any other operation or activity on all or any part of a lease when it has been determined that such suspension or temporary prohibition is in the National interest to:

(1) Facilitate proper development of a lease including a reasonable time to develop a mine and construct necessary support facilities, or

(2) Allow for the construction or negotiation for use of transportation facilities.

(b) The Director may also direct or, at the request of the lessee, approve a suspension or temporary prohibition of production or any other operation or activity, if:

(1) The lessee failed to comply with a provision of applicable law, regulation, order, or the lease;

(2) There is a threat of serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, any mineral deposit, or the marine, coastal, or human environment;

(3) The suspension or temporary prohibition is in the interest of National security or defense;

(4) The suspension or temporary prohibition is necessary for the initiation and conduct of an environmental evaluation to define mitigation measures to avoid or minimize adverse environmental impacts.

(5) The suspension or temporary prohibition is necessary to facilitate the installation of equipment necessary for safety of operations and protection of the environment;

(6) The suspension or temporary prohibition is necessary to allow for undue delays encountered by the lessee in obtaining required permits or consents, including administrative or judicial challenges or appeals;

(7) The Director determines that continued operations would result in premature abandonment of a producing mine, resulting in the loss of otherwise recoverable OCS minerals;

(8) The Director determines that the lessee cannot successfully operate a producing mine due to market conditions that are either temporary in nature or require temporary shutdown and reinvestment in order for the lessee to adapt to the conditions; or

(9) The suspension or temporary prohibition is necessary to comply with judicial decrees prohibiting production or any other operation or activity, or the permitting of those activities, effective the date set by the court for that prohibition.

(c) When the Director orders or approves a suspension or a temporary prohibition of operation or activity including production on all of a lease pursuant to paragraph (a) or (b) of this section, the term of the lease shall be extended for a period of time equal to the period of time that the suspension or temporary prohibition is in effect, except that no lease shall be so extended when the suspension or temporary prohibition is the result of the lessee's gross negligence or willful violation of a provision of the lease or governing regulations.

(d) The Director may, at any time within the period prescribed for a suspension or temporary prohibition issued pursuant to paragraph (b)(2) of this section, require the lessee to submit a Delineation, Testing, or Mining Plan to the Bureau of Ocean Energy Management for approval in accordance with the requirements for the approval of such plans in part 582 of this title.

(e)(1) When the Director orders or issues a suspension or a temporary prohibition pursuant to paragraph (b)(2) of this section, the Director may require the lessee to conduct site-specific studies to identify and evaluate the cause(s) of the hazard(s) generating the suspension or temporary prohibition, the potential for damage from the hazard(s), and the measures available for mitigating the hazard(s). The nature, scope, and content of any study shall be subject to approval by the Director. The lessee shall furnish copies and all results of any such study to the Director. The cost of the study shall be borne by the lessee unless the Director arranges for the cost of the study to be borne by a party other than the lessee. The Director shall make results of any such study available to interested parties and to the public as soon as practicable after the completion of the study and submission of the results thereof.

(2) When the Director determines that measures are necessary, on the basis of the results of the studies conducted in accordance with paragraph (e)(1) of this section and other information available to and identified by the Director, the lessee will be required to take appropriate measures to mitigate, avoid, or minimize the damage or potential damage on which the suspension or temporary prohibition is based. In choosing between alternative mitigation measures, the Director will balance the cost of the required measures against the reduction or potential reduction in damage or threat of damage or harm to life (including fish and other aquatic life), to property, to any mineral deposits (in areas leased or not leased), to the National security or defense, or to the marine, coastal, or human environment. When deemed appropriate by the Director, the lessee must submit to the Bureau of Ocean Energy Management a revised Delineation, Testing, or Mining Plan that incorporates the mitigation measures required by the Director.

(f)(1) If under the provisions of paragraphs (b)(2), (3), and (4) of this section, the Director, with respect to any lease, directs the suspension of production or other operations on the entire leasehold, no payment of rental or minimum royalty shall be due for or during the period of the directed suspension and the time for the lessee specify royalty free period of a period of reduced royalty pursuant to 30 CFR 581.28(b) will be extended for the period of directed suspension. If under the provisions of paragraphs (b)(2), (3), and (4) of this section the Director, with respect to a lease on which there has been no production, directs the suspension of operations on the entire leasehold, no payment of rental shall be due during the period of the directed suspension.

(2) If under the provisions of this section, the Director grants the request of a lessee for a suspension of production or other operations, the lessee's obligations to pay rental, minimum royalty, or royalty shall continue to apply during the period of the approved suspension, unless the Director's approval of the lessee's request for suspension authorizes the payment of a lesser amount during the period of approved suspension. If under the provision of this section, the Director grants a lessee's request for a suspension of production or other operations for a lease which includes provisions for a time period which the lessee may specify during which production from the leasehold would be royalty free or subject to a reduced royalty obligation pursuant to 30 CFR 581.28(b), the time during which production from a leasehold may be royalty free or subject to a reduced royalty obligation shall not be extended unless the Director's approval of the suspension specifies otherwise.

(3) If the lease anniversary date falls within a period of suspension for which no rental or minimum royalty payments are required under paragraph (a) of this section, the prorated rentals or minimum royalties are due and payable as of the date the suspension period terminates. These amounts shall be computed and notice thereof given the lessee. The lessee shall pay the amount due within 30 days after receipt of such notice. The anniversary date of a lease shall not change by reason of any period of lease suspension or rental or royalty relief resulting therefrom.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36153, June 6, 2016]

§ 282.14 Noncompliance, remedies, and penalties.

(a)(1) If the Director determines that a lessee has failed to comply with applicable provisions of law; the regulations in this part; other applicable regulations; the lease; the approved Delineation, Testing, or Mining Plan; or the Director's orders or instructions, and the Director determines that such noncompliance poses a threat of immediate, serious, or irreparable damage to the environment, the mine or the deposit being mined, or other valuable mineral deposits or other resources, the Director shall order the lessee to take immediate and appropriate remedial action to alleviate the threat. Any oral orders shall be followed up by service of a notice of noncompliance upon the lessee by delivery in person to the lessee or agent, or by certified or registered mail addressed to the lessee at the last known address.

(2) If the Director determines that the lessee has failed to comply with applicable provisions of law; the regulations in this part; other applicable regulations; the lease; the requirements of an approved Delineation, Testing, or Mining Plan; or the Director's orders or instructions, and such noncompliance does not pose a threat of immediate, serious, or irreparable damage to the environment, the mine or the deposit being mined, or other valuable mineral deposits or other resources, the Director shall serve a notice of noncompliance upon the lessee by delivery in person to the lessee or agent or by certified or registered mail addressed to the lessee at the last known address.

(b) A notice of noncompliance shall specify in what respect(s) the lessee has failed to comply with the provisions of applicable law; regulations; the lease; the requirements of an approved Delineation, Testing, or Mining Plan; or the Director's orders or instructions, and shall specify the action(s) which must be taken to correct the noncompliance and the time limits within which such action must be taken.

(c) Failure of a lessee to take the actions specified in the notice of noncompliance within the time limit specified shall be grounds for a suspension of operations and other appropriate actions, including but not limited to the assessment of a civil penalty of up to $40,000 per day for each violation that is not corrected within the time period specified (43 U.S.C. 1350(b)).

(d) Whenever the Director determines that a violation of or failure to comply with any provision of the Act; or any provision of a lease, license, or permit issued pursuant to the Act; or any provision of any regulation promulgated under the Act probably occurred and that such apparent violation continued beyond notice of the violation and the expiration of the reasonable time period allowed for corrective action, the Director shall follow the procedures concerning remedies and penalties in subpart N, Remedies and Penalties, of 30 CFR part 250 to determine and assess an appropriate penalty.

(e) The remedies and penalties prescribed in this section shall be concurrent and cumulative, and the exercise of one shall not preclude the exercise of the other. Further, the remedies and penalties prescribed in this section shall be in addition to any other remedies and penalties afforded by any other law or regulation (43 U.S.C. 1350(e)).

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36154, June 6, 2016]

§ 282.15 [Reserved]
Subpart C Obligations and Responsibilities of Lessees
§ 282.20 [Reserved]
§ 282.21 Plans, general.

(a)-(d) [Reserved]

(e) Leasehold activities shall be carried out with due regard to conservation of resources, paying particular attention to the wise management of OCS mineral resources, minimizing waste of the leased resource(s) in mining and processing, and preventing damage to unmined parts of the mineral deposit and other resources of the OCS.

§§ 282.22-282.26 [Reserved]
§ 282.27 Conduct of operations.

(a) The lessee shall conduct all exploration, testing, development, and production activities and other operations in a safe and workmanlike manner and shall maintain equipment in a manner which assures the protection of the lease and its improvements, the health and safety of all persons, and the conservation of property, and the environment.

(b) Nothing in this part shall preclude the use of new or alternative technologies, techniques, procedures, equipment, or activities, other than those prescribed in the regulations of this part, if such other technologies, techniques, procedures, equipment, or activities afford a degree of protection, safety, and performance equal to or better than that intended to be achieved by the regulations of this part, provided the lessee obtains the written approval of the Director prior to the use of such new or alternative technologies, techniques, procedures, equipment, or activities.

(c) The lessee shall immediately notify the Director when there is a death or serious injury; fire, explosion, or other hazardous event which threatens damage to life, a mineral deposit, or equipment; spills of oil, chemical reagents, or other liquid pollutants which could cause pollution; or damage to aquatic life or the environment associated with operations on the lease. As soon as practical, the lessee shall file a detailed report on the event and action(s) taken to control the situation and to mitigate any further damage.

(d)(1) Lessees shall provide means, at all reasonable hours either day or night, for the Director to inspect or investigate the conditions of the operation and to determine whether applicable regulations; terms and conditions of the lease; and the requirements of the approved Delineation, Testing, or Mining Plan are being met.

(2) A lessee shall, on request by the Director, furnish food, quarters, and transportation for BSEE representatives to inspect its facilities. Upon request, you will be reimbursed by BSEE for the actual costs that you incur as a result of providing transportation to BSEE representatives. In addition, you will be reimbursed for the actual costs that you incur for providing food and quarters for a BSEE representative's stay of more than 12 hours. You must submit an invoice for reimbursement within 90 days of the inspection.

(e) Mining and processing vessels, platforms, structures, artificial islands, and mobile drilling units which have helicopter landing facilities shall be identified with at least one sign using letters and figures not less than 12 inches in height. Signs for structures without helicopter landing facilities shall be identified with at least one sign using letters and figures not less than 3 inches in height. Signs shall be affixed at a location that is visible to approaching traffic and shall contain the following information which may be abbreviated:

(1) Name of the lease operator;

(2) The area designation based on Official OCS Protraction Diagrams;

(3) The block number in which the facility is located; and

(4) Vessel, platform, structure, or rig name.

(f)(1) Drilling. (i) When drilling on lands valuable or potentially valuable for oil and gas or geopressured or geothermal resources, drilling equipment shall be equipped with blowout prevention and control devices acceptable to the Director before penetrating more than 500 feet unless a different depth is specified in advance by the Director.

(ii) In cases where the Director determines that there is sufficient likelihood of encountering pressurized hydrocarbons, the Director may require that the lessee comply with all or portions of the requirements in part 250, subpart D, of this title.

(iii) Before drilling any hole which may penetrate an aquifer, the lessee shall follow the procedures included in the approved plan for the penetration and isolation of the aquifer during the drilling operation, during use of the hole, and for subsequent abandonment of the hole.

(iv) Cuttings from holes drilled on the lease shall be disposed of and monitored in accordance with the approved plan.

(v) The use of muds in drilling holes on the lease and their subsequent disposition shall be according to the approved plan.

(2) All drill holes which are susceptible to logging shall be logged, and the lessee shall prepare a detailed lithologic log of each drill hole. Drill holes which are drilled deeper than 500 feet shall be drilled in a manner which permits logging. Copies of logs of cores and cuttings and all in-hole surveys such as electronic logs, gamma ray logs, neutron density logs, and sonic logs shall be provided to the Director.

(3) Drill holes for exploration, testing, development, or production shall be properly plugged and abandoned to the satisfaction of the Director in accordance with the approved plan and in such a manner as to protect the surface and not endanger any operation; any freshwater aquifer; or deposit of oil, gas, or other mineral substance.

(g) The use of explosives on the lease shall be in accordance with the approved plan.

(h)(1) Any equipment placed on the seabed shall be designed to allow its recovery and removal upon abandonment of leasehold activities.

(2) Disposal of equipment, cables, chains, containers, or other materials into the ocean is prohibited.

(3) Materials, equipment, tools, containers, and other items used on the OCS which are of such shape or configuration that they are likely to snag or damage fishing devices shall be handled and marked as follows:

(i) All loose materials, small tools, and other small objects shall be kept in a suitable storage area or a marked container when not in use or in a marked container before transport over OCS waters;

(ii) All cable, chain, or wire segments shall be recovered after use and securely stored;

(iii) Skid-mounted equipment, portable containers, spools or reels, and drums shall be marked with the owner's name prior to use or transport over OCS waters; and

(iv) All markings must clearly identify the owner and must be durable enough to resist the effects of the environmental conditions to which they are exposed.

(4) Any equipment or material described in paragraphs (h)(2), (h)(3)(ii), and (iii) of this section that is lost overboard shall be recorded on the daily operations report of the facility and reported to the Director and to the U.S. Coast Guard.

(i) Any bulk sampling or testing that is necessary to be conducted prior to submission of a Mining Plan shall be in accordance with an approved Testing Plan. The sale of any OCS minerals acquired under an approved Testing Plan shall be subject to the payment of the royalty specified in the lease to the United States.

(j) Installations and structures: (1) The lessee shall design, fabricate, install, use, inspect, and maintain all installations and structures, including platforms on the OCS, to assure the structural integrity of all installations and structures for the safe conduct of exploration, testing, mining, and processing activities considering the specific environmental conditions at the location of the installation or structure.

(2) All fixed or bottom-founded platforms or other structures, e.g., artificial islands shall be designed, fabricated, installed, inspected, and maintained in accordance with the provisions of 30 CFR part 250, subpart I.

(k) The lessee shall not produce any OCS mineral until the method of measurement and the procedures for product valuation have been instituted in accordance with the approved Testing or Mining Plan. The lessee shall enter the weight or quantity and quality of each mineral produced in accordance with 30 CFR 582.29.

(l) The lessee shall conduct OCS mineral processing operations in accordance with the approved Testing or Mining Plan and use due diligence in the reduction, concentration, or separation of mineral substances by mechanical or chemical processes, by evaporation, or other means, so that the percentage of concentrates or other mineral substances are recovered in accordance with the practices approved in the Testing or Mining Plan.

(m) No material shall be discharged or disposed of except in accordance with the approved disposal practice and procedures contained in the approved Delineation, Testing, or Mining Plan.

[76 FR 64462, Oct. 18, 2011, as amended at 81 FR 36154, June 6, 2016]

§ 282.28 Environmental protection measures.

(a)-(b) [Reserved]

(c)(1) The lessee shall monitor activities in a manner that develops the data and information necessary to enable the Director to assess the impacts of exploration, testing, mining, and processing activities on the environment on and off the lease; develop and evaluate methods for mitigating adverse environmental effects; validate assessments made in previous environmental evaluations; and ensure compliance with lease and other requirements for the protection of the environment.

(2) Monitoring of environmental effects shall include determination of the spatial and temporal environmental changes induced by the exploration, testing, development, production, and processing activities on the flora and fauna of the sea surface, the water column, and/or the seafloor.

(3) The Director may place observers onboard exploration, testing, mining, and processing vessels; installations; or structures to ensure that the provisions of the lease, the approved plan, and these regulations are followed and to evaluate the effectiveness of the approved monitoring and mitigation practices and procedures in protecting the environment.

(4) The Director may order or the lessee may request a modification of the approved monitoring program prior to the startup of testing activities or commercial-scale recovery, and at other appropriate times as necessary, to reflect accurately the proposed operations or to incorporate the results of recent research or improved monitoring techniques.

(5) [Reserved]

(6) When required, the monitoring plan will specify:

(i) The sampling techniques and procedures to be used to acquire the needed data and information;

(ii) The format to be used in analysis and presentation of the data and information;

(iii) The equipment, techniques, and procedures to be used in carrying out the monitoring program; and

(iv) The name and qualifications of person(s) designated to be responsible for carrying out the environmental monitoring.

(d) Lessees shall develop and conduct their operations in a manner designed to avoid, minimize, or otherwise mitigate environmental impacts and to demonstrate the effectiveness of efforts to that end. Based upon results of the monitoring program, the Director may specify particular procedures for mitigating environmental impacts.

(e) [Reserved]

§§ 282.29-282.30 [Reserved]
§ 282.31 Suspension of production or other operations.

A lessee may submit a request for a suspension of production or other operations. The request shall include justification for granting the requested suspension, a schedule of work leading to the initiation or restoration of production or other operations, and any other information the Director may require.

Subpart D Payments
§ 282.40 [Reserved]
§ 282.41 Method of royalty calculation.

In the event that the provisions of royalty management regulations in part 1206 of chapter XII do not apply to the specific commodities produced under regulations in this part, the lessee shall comply with procedures specified in the leasing notice.

§ 282.42 [Reserved]
Subpart E Appeals
§ 282.50 Appeals.

See 30 CFR part 290 for instructions on how to appeal any order or decision that we issue under this part.

PART 285 RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF

Authority: 43 U.S.C. 1331 et seq.

Source: 88 FR 6413, Jan. 31, 2023, unless otherwise noted.

Subpart A General Provisions
§ 285.100 Authority.

The authority for this part derives from the Outer Continental Shelf Lands Act (OCS Lands Act) (43 U.S.C. 1337). The Secretary of the Interior delegated to the Bureau of Safety and Environmental Enforcement (BSEE) the authority to regulate certain activities. These regulations specifically apply to activities that:

(a) Produce or support production, transportation, or transmission of energy from sources other than oil and gas; or

(b) Use, for energy-related purposes or for other authorized marine-related purposes, facilities currently or previously used for activities authorized under the OCS Lands Act.

§ 285.101 What is the purpose of this part?

The purpose of this part is to:

(a) Inform you and third parties of your obligations when you undertake activities authorized in this part and 30 CFR parts 585 and 586; and

(b) Ensure that renewable energy activities on the OCS and activities involving the alternate use of OCS facilities for energy- or marine-related purposes are conducted in a safe and environmentally sound manner, in conformance with the requirements of subsection 8(p) of the OCS Lands Act, other applicable laws and regulations, and the terms of your lease, ROW grant, RUE grant, or Alternate Use RUE grant.

§ 285.102 What are BSEE's responsibilities under this part?

(a) BSEE will ensure that any activities authorized in this part and 30 CFR parts 585 and 586 are carried out in a manner that provides for:

(1) Safety;

(2) Protection of the environment;

(3) Prevention of waste;

(4) Conservation of the natural resources of the OCS;

(5) Coordination with relevant Federal agencies (including, in particular, those agencies involved in planning activities that are undertaken to avoid conflicts among users and maximize the economic and ecological benefits of the OCS, including multifaceted spatial planning efforts);

(6) Protection of national security interests of the United States;

(7) Protection of the rights of other authorized users of the OCS; and

(8) Oversight, inspection, research, monitoring, and enforcement of activities authorized by a lease or grant issued under 30 CFR parts 585 or 586.

(b) BSEE will require compliance with all applicable laws, regulations, other requirements, and the terms of your lease or grant issued under 30 CFR parts 585 or 586, and approved plans. BSEE will approve, disapprove, or approve with conditions any applications or other documents submitted to BSEE for approval under the provisions of this part.

(c) Unless otherwise provided in this part, BSEE may give oral directives or decisions whenever prior BSEE approval is required under this part. BSEE will document in writing any such oral directives within 10 business days.

(d) BSEE will establish practices and procedures to govern the collection of all payments due under this part to the Federal Government, including any cost recovery fees and other fees or payments. BSEE will do this in accordance with the terms of this part, the leasing notice, the lease or grant under 30 CFR parts 585 or 586, and applicable Office of Natural Resources Revenue (ONRR) regulations or guidance.

§ 285.103 When may BSEE prescribe or approve departures from the regulations in this part?

(a) BSEE may prescribe or approve departures from the provisions of this part when departures are necessary because the applicable provision(s) as applied to a specific circumstance:

(1) Are impractical or unduly burdensome and the departure is necessary to achieve the intended objectives of the renewable energy program;

(2) Fail to conserve the natural resources of the OCS;

(3) Fail to protect life (including human and wildlife), property, or the marine, coastal, or human environment; or

(4) Fail to protect sites, structures, or objects of historical or archaeological significance.

(b) Any departure approved under this section and its rationale must:

(1) Be consistent with subsection 8(p) of the OCS Lands Act;

(2) Protect the environment and the public health and safety to the same degree as if there was no approved departure from the regulations;

(3) Not impair the rights of third parties; and

(4) Be documented in writing.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42713, May 15, 2024]

§ 285.104 [Reserved]
§ 285.105 What are my responsibilities under this part?

As a lessee, applicant, operator, or holder of a ROW grant, RUE grant, or Alternate Use RUE grant, you must:

(a) Design your projects and conduct all activities in a manner that ensures safety and will not cause undue harm or damage to natural resources, including their physical, atmospheric, and biological components to the extent practicable; and take measures to prevent unauthorized discharge of pollutants including marine trash and debris into the offshore environment.

(b) Submit requests, applications, notices, modifications, and supplemental information to BSEE as required by this part;

(c) Follow up, in writing, any oral request or notification you made, within 3 business days;

(d) Comply with all applicable laws and regulations, the terms of your lease or grant under 30 CFR part 585 or 586, reports, notices, and approved plans prepared under this part, 30 CFR part 585 or 586, and any conditions imposed by BOEM or BSEE through its review of any of these reports, notices, and approved plans, as provided in this part or in 30 CFR part 585 or 586;

(e) Make all applicable payments on time;

(f) Comply with the DOI's nonprocurement debarment regulations at 2 CFR part 1400;

(g) Include the requirement to comply with 2 CFR part 1400 in all contracts and transactions related to a lease or grant under this part;

(h) Conduct all activities authorized by the lease or grant in a manner consistent with the provisions of subsection 8(p) of the OCS Lands Act;

(i) Compile, retain, and make available to BSEE representatives, within the time specified by BSEE, any data and information related to the site assessment, design, and operations of your project; and

(j) Respond to requests from the Director in a timely manner.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42713, May 15, 2024]

§§ 285.106-285.109 [Reserved]
§ 285.110 How do I submit applications, reports, or notices required by this part?

Unless otherwise stated, you must submit one electronic copy of all plans, applications, reports, or notices required by this part to BSEE. BSEE will inform you if it requires paper copies of specific documents. Unless stated otherwise, documents should be submitted to the relevant contacts listed on the BSEE website. [89 FR 42713, May 15, 2024]

§ 285.111 When and how does BSEE charge me processing fees on a case-by-case basis?

(a) BSEE will charge a processing fee on a case-by-case basis under the procedures in this section with regard to any application or request under this part if we decide at any time that the preparation of a particular document or study is necessary for the application or request and it will have a unique processing cost.

(1) Processing costs will include contract oversight and efforts to review and approve documents prepared by contractors, whether the contractor is paid directly by the applicant or through BSEE.

(2) We may apply a standard overhead rate to direct processing costs.

(b) We will assess the ongoing processing fee for each individual application or request according to the following procedures:

(1) Before we process your application or request, we will give you a written estimate of the proposed fee based on reasonable processing costs.

(2) You may comment on the proposed fee.

(3) You may:

(i) Ask for our approval to perform, or to directly pay a contractor to perform, all or part of any document, study, or other activity according to standards we specify, thereby reducing our costs for processing your application or request; or

(ii) Ask to pay us to perform, or contract for, all or part of any document, study, or other activity.

(4) We will then give you the final estimate of the processing fee amount with payment terms and instructions after considering your comments and any BSEE-approved work you will do.

(i) If we encounter higher or lower processing costs than anticipated, we will re-estimate our reasonable processing costs following the procedures in paragraphs (b)(1) through (4) of this section, but we will not stop ongoing processing unless you do not pay in accordance with paragraph (b)(5) of this section.

(ii) Once processing is complete, we will refund to you the amount of money that we did not spend on processing costs.

(5)(i) Consistent with the payment and billing terms provided in the final estimate, we will periodically estimate what our reasonable processing costs will be for a specific period and will bill you for that period. Payment is due to us 30 days after you receive your bill. We will stop processing your document if you do not pay the bill by the date payment is due.

(ii) If a periodic payment turns out to be more or less than our reasonable processing costs for the period, we will adjust the next billing accordingly or make a refund. Do not deduct any amount from a payment without our prior written approval.

(6) You must pay the entire fee before we will issue the final document or take final action on your application or request.

(7) You may appeal our estimated processing costs in accordance with the regulations in 43 CFR part 4. We will not process the document further until the appeal is resolved, unless you pay the fee under protest while the appeal is pending. If the appeal results in a decision changing the proposed fee, we will adjust the fee in accordance with paragraph (b)(5)(ii) of this section. If we adjust the fee downward, we will not pay interest.

§ 285.112 Definitions.

Terms used in this part have the meanings as defined in this section: P>Affected State means with respect to any activities proposed, conducted, or approved under this part, any coastal State—

(1) That is, or is proposed to be, the site of gathering, transmitting, or distributing energy or is otherwise receiving, processing, refining, or transshipping products, or services derived from activities approved under this part;

(2) That is used, or is scheduled to be used, as a support base for activities approved under this part; or

(3) In which there is a reasonable probability of significant effect on land or water uses from activities approved under this part.

Alternate Use refers to the energy- or marine-related use of an existing OCS facility for activities not otherwise authorized by this title or other applicable law.

Alternate Use RUE means a right-of-use and easement issued for activities authorized under subpart J of this part or part 586.

Archaeological resource means any material remains of human life or activities that are at least 50 years of age and that are of archaeological interest (i.e., which are capable of providing scientific or humanistic understanding of past human behavior, cultural adaptation, and related topics through the application of scientific or scholarly techniques, such as controlled observation, contextual measurement, controlled collection, analysis, interpretation, and explanation).

BOEM means the Bureau of Ocean Energy Management of the Department of the Interior.

BSEE means the Bureau of Safety and Environmental Enforcement of the Department of the Interior.

Certified Verification Agent (CVA) means an individual or organization, experienced in the design, fabrication, and installation of offshore marine facilities or structures, who will conduct specified third-party reviews, inspections, and verifications in accordance with this part.

Commercial activities means, under renewable energy leases and grants, all activities associated with the generation, storage, or transmission of electricity or other energy product from a renewable energy project on the OCS, and for which such electricity or other energy product is intended for distribution, sale, or other commercial use, except for electricity or other energy product distributed or sold pursuant to technology-testing activities on a limited lease. This term also includes activities associated with all stages of development, including initial site characterization and assessment, facility construction, and project decommissioning.

Commercial lease means a lease issued under 30 CFR part 585 that specifies the terms and conditions under which a person can conduct commercial activities.

Commercial operations means the generation of electricity or other energy product for commercial use, sale, transmission, or distribution from a commercial lease.

Critical Safety Systems and Equipment means safety systems and equipment designed to prevent or ameliorate fires, spillages, or other major accidents that could result in harm to health, safety, or the environment in the area of your facilities.

Decommissioning means removing BOEM and BSEE approved facilities and returning the site of the lease or grant to a condition that meets the requirements under subpart I of this part.

Director means the Director of the Bureau of Safety and Environmental Enforcement (BSEE), of the U.S. Department of the Interior, or an official authorized to act on the Director's behalf.

Fabrication means the cutting, fitting, welding, or other assembly of project elements.

Facility means an installation that is permanently or temporarily attached to the seabed of the OCS. Facilities include any structures; devices; appurtenances; gathering, transmission, and distribution cables; pipelines; and permanently moored vessels. Any group of OCS installations interconnected with walkways, or any group of installations that includes a central or primary installation with one or more satellite or secondary installations, is a single facility. BOEM and BSEE may decide that the complexity of the installations justifies their classification as separate facilities.

Grant means a right-of-way, right-of-use and easement, or alternate use right-of-use and easement issued under the provisions of 30 CFR parts 585 or 586.

Human environment means the physical, social, and economic components, conditions, and factors that interactively determine the state, condition, and quality of living conditions, employment, and health of those affected, directly or indirectly, by activities occurring on the OCS.

Lease means an agreement authorizing the use of a designated portion of the OCS for activities allowed under this part or 30 CFR part 585. The term also means the area covered by that agreement, when the context requires.

Lessee means the holder of a lease, a BOEM-approved assignee, and, when describing the conduct required of parties engaged in activities on the lease, it also refers to the operator and all persons authorized by the holder of the lease or operator to conduct activities on the lease.

Limited lease means a lease issued under 30 CFR part 585 that specifies the terms and conditions under which a person may conduct activities on the OCS that support the production of energy, but do not result in the production of electricity or other energy product for sale, distribution, or other commercial use exceeding a limit specified in the lease.

Natural resources include, without limiting the generality thereof, renewable energy, oil, gas, and all other minerals (as defined in section 2(q) of the OCS Lands Act), and marine animal and marine plant life.

Operator means the individual, corporation, or association having control or management of activities on the lease or grant issued under 30 CFR parts 585 or 586. The operator may be a lessee, grant holder, or a contractor designated by the lessee or holder of a grant issued under 30 CFR parts 585 or 586.

Outer Continental Shelf (OCS) means all submerged lands lying seaward and outside of the area of lands beneath navigable waters, as defined in section 2 of the Submerged Lands Act (43 U.S.C. 1301), whose subsoil and seabed appertain to the United States and are subject to its jurisdiction and control.

Person means, in addition to a natural person, an association (including partnerships and joint ventures); a Federal agency; a State; a political subdivision of a State; a Native American Tribal government; or a private, public, or municipal corporation.

Project, for the purposes of defining the source of revenues to be shared, means a lease ROW, RUE, or Alternate Use RUE on which the activities authorized under this part or 30 CFR parts 585 or 586 are conducted on the OCS. The term “project” may be used elsewhere in this rule to refer to these same authorized activities, the facilities used to conduct these activities, or to the geographic area of the project, i.e., the project area.

Project Design Envelope (PDE) means a reasonable range of design parameters proposed in a lessee's plan for components of the project, such as type, dimensions, and number of wind turbine generators; foundation type; location of the export cable route; location of an onshore substation; location of the grid connection point; and construction methods and timing.

Project easement means an easement to which, upon approval of your Construction and Operations Plan (COP) or General Activities Plan (GAP), you are entitled as part of the lease for the purpose of installing, gathering, transmission, and distribution cables, pipelines, and appurtenances on the OCS as necessary for the full enjoyment of the lease.

Renewable energy means energy resources other than oil and gas and minerals as defined in 30 CFR part 580. Such resources include, but are not limited to, wind, solar, and ocean waves, tides, and current.

Revenues mean bonuses, rents, operating fees, and similar payments made in connection with a project or project area. It does not include administrative fees such as those assessed for cost recovery, civil penalties, and forfeiture of financial assurance.

Right-of-use and easement (RUE) grant means an easement issued by BOEM under 30 CFR parts 585 or 586 that authorizes use of a designated portion of the OCS to support activities on a lease or other use authorization for renewable energy activities. The term also means the area covered by the authorization.

Right-of-way (ROW) grant means an authorization issued by BOEM under 30 CFR part 585 to use a portion of the OCS for the construction and use of a cable or pipeline for the purpose of gathering, transmitting, distributing, or otherwise transporting electricity or other energy product generated or produced from renewable energy, but does not constitute a project easement under 30 CFR part 585. The term also means the area covered by the authorization.

Secretary means the Secretary of the Interior or an official authorized to act on the Secretary's behalf.

Significant archaeological resource means an archaeological resource that meets the criteria of significance for eligibility for listing in the National Register of Historic Places, as defined in 36 CFR 60.4, or its successor.

Site assessment activities means those initial activities conducted to assess an area on the OCS, such as resource assessment surveys (e.g., meteorological and oceanographic) or technology testing, involving the installation of bottom-founded facilities.

We, us, and our refer to the Bureau of Safety and Environmental Enforcement of the Department of the Interior, or its possessive, depending on the context.

You and your means an applicant, lessee, the operator, or designated operator, ROW grant holder, RUE grant holder, or Alternate Use RUE grant holder under 30 CFR parts 585 or 586, or the designated agent of any of these, or the possessive of each, depending on the context. The terms you and your also include contractors and subcontractors of the entities specified in the preceding sentence.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42713, May 15, 2024]

§ 285.113 How will data and information obtained by BSEE under this part be disclosed to the public?

(a) BSEE will make data and information available in accordance with the requirements and subject to the limitations of the Freedom of Information Act (FOIA) (5 U.S.C. 552) and the regulations contained in 43 CFR part 2.

(b) BSEE will not release such data and information that we have determined is exempt from disclosure under exemption 4 of FOIA. We will review such data and information and objections of the submitter by the following schedule to determine whether release at that time will result in substantial competitive harm or disclosure of trade secrets.

If you have a . . . | Then BSEE will review data and information for possible release:

(1) Commercial lease | At the earlier of: (i) 3 years after the commencement of commercial operations; or (ii) 3 years after the lease terminates.

(2) Limited lease | At 3 years after the lease terminates.

(3) ROW or RUE grant | At the earliest of: (i) 10 years after the approval of the grant;

(ii) Grant termination; or

(iii) 3 years after the completion of construction activities.

(c) After considering any objections from the submitter, if we determine that release of such data and information will result in:

(1) No substantial competitive harm or disclosure of trade secrets, then the data and information will be released.

(2) Substantial competitive harm or disclosure of trade secrets, then the data and information will not be released at that time but will be subject to further review every 3 years thereafter.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42714, May 15, 2024]

§ 285.114 Paperwork Reduction Act statements—information collection.

(a) The Office of Management and Budget (OMB) has approved the information collection requirements in 30 CFR part 285 under 43 U.S.C. 1331 et seq. and assigned OMB Control Number 1014-0034. The table in paragraph (e) of this section lists the subparts in the rule requiring the information and its title, summarizes the reasons for collecting the information, and summarizes how BSEE uses the information.

(b) Respondents are primarily renewable energy applicants, lessees, ROW grant holders, RUE grant holders, Alternate Use RUE grant holders, and operators. The requirement to respond to the information collection in this part is mandated under subsection 8(p) of the OCS Lands Act. Some responses are also required to obtain or retain a benefit, or may be voluntary.

(c) The Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) requires us to inform the public that an agency may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a currently valid OMB control number.

(d) Comments regarding any aspect of the collections of information under this part, including suggestions for reducing the burden, should be sent to the Information Collection Clearance Officer, Bureau of Safety and Environmental Enforcement, 45600 Woodland Road, Sterling, VA 20166.

(e) BSEE is collecting this information for the reasons given in the following table:

30 CFR 285 subpart and title | Reasons for collecting information and how used

(1) Subpart A—General Provisions | To inform BSEE of actions taken to comply with general operational requirements on the OCS. To ensure that operations on the OCS meet statutory and regulatory requirements, are safe and protect the environment, and result in diligent development on OCS leases.

(2) Subpart D—Lease and Grant Administration | To ensure compliance with regulations pertaining to a lease or grant, and suspension of leases and grants.

(3)Subpart F—Information Requirements | To enable BSEE to comply with Federal laws to ensure the safety of the environment on the OCS.

(4) Subpart G—Facility Design, Fabrication, and Installation | To enable BSEE to review the final design, fabrication, and installation of facilities on a lease or grant to ensure that these facilities are designed, fabricated, and installed according to appropriate standards in compliance with BSEE provisions, and where applicable, the approved plan.

(5) Subpart H—Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs, and GAPs | To ensure that lease and grant operations are conducted in a manner that is safe and protects the environment. To ensure compliance with other Federal laws, these regulations, the lease or grant, and approved plans.

(6) Subpart I—Decommissioning | To determine that decommissioning activities comply with regulatory requirements and approvals. To ensure that site clearance and platform or pipeline removal are properly performed to protect marine life and the environment and do not conflict with other users of the OCS.

(7) Subpart J—Rights of Use and Easement for Energy- and Marine- Related Activities Using Existing OCS Facilities | To enable BSEE to review information regarding the design, installation, and operation of RUEs on the OCS, to ensure that RUE operations are safe and protect the human, marine, and coastal environment. To ensure compliance with other Federal laws, these regulations, the RUE grant, and where applicable, the approved plan.

[88 FR 6413, Jan. 31, 2023; 88 FR 54880, Aug. 14, 2023]

§ 285.115 Documents incorporated by reference.

Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved incorporation by reference (IBR) material is available for inspection at BSEE and at the National Archives and Records Administration (NARA). Contact BSEE at: BSEE, 45600 Woodland Road, Sterling, Virginia 20166, phone: 703-787-1665. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations.html or email fr.inspection@nara.gov. The material is available from the American Petroleum Institute (API), 200 Massachusetts Avenue NW, Suite 1100, Washington, DC 20001-5571; phone (202) 682-8000; website: www.api.org or https://publications.api.org.

(a) API RP 2A-WSD, Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms—Working Stress Design; Twenty-first Edition, December 2000; Errata and Supplement 1, December 2002; Errata and Supplement 2, September 2005; Errata and Supplement 3, October 2007. IBR approved for § 285.825(a), (b).

(b) [Reserved]

§ 285.116 Requests for information on the state of the offshore renewable energy industry.

BSEE may publish a request for information (RFI) in the Federal Register to solicit information from industry, State and local agencies, federally recognized Tribes, and other interested entities for evaluating the offshore renewable energy industry, including the identification of potential challenges or obstacles to its continued development. An RFI may relate to the identification of environmental, technical, regulatory, or economic matters that promote or detract from continued development of renewable energy technologies on the OCS. BSEE may use the information received to refine its renewable energy program, including to facilitate OCS renewable energy development in a safe and environmentally responsible manner and to ensure a fair return to the United States for use of the OCS.

[89 FR 42714, May 15, 2024]

§ 285.117 Severability.

If a court holds any provisions of this subpart or their applicability to any persons or circumstances invalid, the remainder of the provisions and their applicability to any persons or circumstances will not be affected.

[89 FR 42714, May 15, 2024]

§ 285.118 What are my appeal rights?

(a) Any party adversely affected by a final decision issued by BSEE under this part may appeal that decision to the Interior Board of Land Appeals (IBLA), under 30 CFR part 290 and 43 CFR part 4, subpart E.

(b) Any final decision will remain in full force and effect during the pendency of an appeal unless a stay is granted pursuant to 43 CFR part 4.

[89 FR 42714, May 15, 2024]

B Subparts B and C [Reserved]
Subpart D Lease and Grant Administration
158 Noncompliance and Cessation Orders
§ 285.400 What happens if I fail to comply with this part?

(a) BSEE may take appropriate corrective action under this part if you fail to comply with applicable provisions of Federal law, the regulations in this part, other applicable regulations, any order of the Director, the provisions of a lease or grant issued under 30 CFR parts 585 or 586, or the requirements of an approved plan or other approval under this part or 30 CFR parts 585 or 586.

(b) BSEE may issue to you a notice of noncompliance if we determine that there has been a violation of the regulations in this part, any order of the Director, or any provision of your lease, grant or other approval issued under this part or 30 CFR parts 585 or 586. When issuing a notice of noncompliance, BSEE will serve you at your last known address.

(c) A notice of noncompliance will tell you how you failed to comply with this part, any order of either Director, and/or the provisions of your lease, grant or other approval, and will specify what you must do to correct the noncompliance and the time limits within which you must act.

(d) Failure of a lessee, operator, or grant holder under this part to take the actions specified in a notice of noncompliance within the time limit specified provides the basis for BSEE to issue a cessation order as provided in § 285.401, and/or a cancellation of the lease or grant as provided in § 285.437.

(e) If BSEE determines that any incident of noncompliance poses an imminent threat of serious or irreparable damage to natural resources; life (including human and wildlife); property; the marine, coastal, or human environment; or sites, structures, or objects of historical or archaeological significance, BSEE may include with its notice of noncompliance an order directing you to take immediate remedial action to alleviate threats and to abate the violation and, when appropriate, a cessation order.

(f) BSEE may assess civil penalties, as authorized by section 24 of the OCS Lands Act and as determined under the procedures set forth in 30 CFR part 250, subpart N, if you fail to comply with any provision of this part, or any term of a lease, grant, or order issued under the authority of this part:

(1) After notice of such failure and expiration of any reasonable period allowed for corrective action; or

(2) BSEE determines that the failure constitutes, or constituted, a threat of serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, or the marine, coastal, or human environment.

(g) You may be subject to criminal penalties as authorized by section 24 of the OCS Lands Act.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42714, May 15, 2024]

§ 285.401 When may BSEE issue a cessation order?

(a) BSEE may issue a cessation order during the term of your lease or grant when you fail to comply with an applicable law; regulation; order; or provision of a lease, grant, plan, or BSEE or BOEM approval. Except as provided in § 285.400(e), BSEE will allow you a period of time to correct any noncompliance before issuing an order to cease activities.

(b) A cessation order will set forth what measures you are required to take, including reports you are required to prepare and submit to BSEE, to receive approval to resume activities on your lease or grant.

§ 285.402 What is the effect of a cessation order?

(a) Upon receiving a cessation order, you must cease all activities on your lease or grant, as specified in the order. BSEE may authorize certain activities during the period of the cessation order.

(b) A cessation order will last for the period specified in the order or as otherwise specified by BSEE. If BSEE determines that the circumstances giving rise to the cessation order cannot be resolved within a reasonable time period, the Secretary may initiate cancellation of your lease or grant, as provided in § 285.437.

(c) A cessation order does not extend the term of your lease or grant for the period you are prohibited from conducting activities.

(d) You must continue to make all required payments on your lease or grant during the period a cessation order is in effect.

§ 285.403-285.405 [Reserved]
159 Responsibility for Fulfilling Obligations
§ 285.406 Who is responsible for fulfilling lease and grant obligations?

(a) When you are not the sole lessee or grantee, you and your co-lessee(s) or co-grantee(s) are jointly and severally responsible for fulfilling your obligations under the lease or grant and the provisions of this part or 30 CFR parts 585 or 586, unless otherwise provided in this part.

(b) If your designated operator fails to fulfill any of your obligations under the lease or grant and this part or 30 CFR parts 585 or 586, BSEE may require you or any or all of your co-lessees or co-grantees to fulfill those obligations or other operational obligations under the OCS Lands Act, the lease, grant, or the regulations.

(c) Whenever the regulations in this part or 30 CFR parts 585 or 586 require the lessee or grantee to conduct an activity in a prescribed manner, the lessee or grantee and operator (if one has been designated) are jointly and severally responsible for complying with the regulations.

§ 285.407-285.414 [Reserved]
160 Lease or Grant Suspension
§ 285.415 What is a lease or grant suspension?

(a) A suspension is an interruption of the term of your lease or grant that may occur as ordered by BSEE, as provided in § 285.417; or as approved or ordered by BOEM, as provided in 30 CFR 585.416 and 585.417.

(b) A suspension extends the expiration date for the relevant period of your lease or grant for the length of time the suspension is in effect.

(c) Activities may not be conducted on your lease or grant during the period of a suspension except as expressly authorized under the terms of the suspension.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42714, May 15, 2024]

§ 285.416 [Reserved]
§ 285.417 When may BSEE order a suspension?

(a) BSEE may order a suspension under the following circumstances:

(1) When necessary to comply with judicial decrees prohibiting some or all activities under your lease; or

(2) When continued activities pose an imminent threat of serious or irreparable harm or damage to natural resources; life (including human and wildlife); property; the marine, coastal, or human environment; or sites, structures, or objects of historical or archaeological significance.

(b) If BSEE orders a suspension under paragraph (a)(2) of this section, and if you wish to resume activities, we may require you to conduct a site-specific study that evaluates the cause of the harm, the potential damage, and the available mitigation measures. Other requirements and actions may occur:

(1) You may be required to pay for the study;

(2) You must furnish an electronic copy of the study and results to BSEE pursuant to § 285.110;

(3) We will make the results available to other interested parties and to the public; and

(4) We will use the results of the study and any other information that become available:

(i) To decide if the suspension order can be lifted; and

(ii) To determine any actions that you must take to mitigate or avoid any damage to natural resources; life (including human and wildlife); property; the marine, coastal, or human environment; or sites, structures, or objects of historical or archaeological significance.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42714, May 15, 2024]

§ 285.418 How will BSEE issue a suspension?

(a) BSEE will issue a suspension order orally or in writing.

(b) BSEE will send you a written suspension order as soon as practicable after issuing an oral suspension order.

(c) The written order will explain the reasons for its issuance and describe the effect of the suspension order on your lease or grant and any associated activities. BSEE may authorize certain activities during the period of the suspension, as set forth in the suspension order.

§ 285.419 What are my immediate responsibilities if I receive a suspension order?

You must comply with the terms of a suspension order upon receipt and take any action prescribed within the time set forth therein.

§ 285.420 What effect does a suspension order have on my payments?

If BSEE orders a suspension, as provided in § 285.417, BOEM may waive or defer your payment obligations during the suspension. BOEM's decision to waive or defer payments will depend on the reasons for the suspension, including your responsibility for the circumstances necessitating a suspension.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42714, May 15, 2024]

§ 285.421 How long will a suspension be in effect?

A suspension will be in effect for the period specified by BSEE. If BSEE determines that the circumstances giving rise to a suspension ordered under § 285.417 cannot be resolved within 5 years, the Secretary may initiate cancellation of the lease or grant, as provided in § 285.437.

§§ 285.422-285.432 [Reserved]
161 Lease or Grant Termination
§ 285.433 What must I do after my lease or grant terminates?

(a) After your lease or grant terminates, you must:

(1) Make all payments due; and

(2) Perform any other outstanding obligations under the lease or grant within 6 months.

(b) Within 2 years following termination of a lease or grant, you must remove or dispose of all facilities, installations, and other devices permanently or temporarily attached to the seabed on the OCS in accordance with your Plan approved by BOEM under 30 CFR part 585, subpart F, and your application approved by BSEE under subpart I of this part.

(c) If you fail to comply with your approved decommissioning plan or application:

(1) BOEM may call for the forfeiture of your financial assurance; and

(2) You remain liable for removal or disposal costs and responsible for accidents or damages that might result from such failure.

§§ 285.434-285.436 [Reserved]
162 Lease or Grant Cancellation
§ 285.437 When can my lease or grant be canceled?

(a) The Secretary will cancel any lease or grant issued under 30 CFR parts 585 or 586 upon proof that it was obtained by fraud or misrepresentation, and after notice and opportunity to be heard has been afforded to the lessee or grant holder.

(b) The Secretary may cancel any lease or grant issued under 30 CFR parts 585 or 586 when:

(1) The Secretary determines after notice and opportunity for a hearing that, with respect to the lease or grant that would be canceled, the lessee or grantee has failed to comply with any applicable provision of the OCS Lands Act or these regulations; any order of the Director; or any term, condition or stipulation contained in the lease or grant, and that the failure to comply continued 30 days (or other period BSEE specifies) after you receive notice from BSEE. The Secretary will mail a notice by registered or certified letter to the lessee or grantee at its record post office address;

(2) Required by national security or defense; or

(3) The Secretary determines after notice and opportunity for a hearing that continued activity under the lease or grant:

(i) Would cause serious harm or damage to natural resources; life (including human and wildlife); property; the marine, coastal, or human environment; or sites, structures, or objects of historical or archaeological significance;

(ii) That the threat of harm or damage would not disappear or decrease to an acceptable extent within a reasonable period of time; and

(iii) The advantages of cancellation outweigh the advantages of continuing the lease or grant in force.

E Subpart E [Reserved]
Subpart F Information Requirements
§§ 285.600-285.601 [Reserved]
§ 285.602 What records must I maintain?

Until BOEM releases your financial assurance under 30 CFR 585.534, you must maintain and provide to BSEE, upon request, all data and information related to compliance with the required terms and conditions of your lease, grant, reports submitted under this part and approved plans.

[89 FR 42715, May 15, 2024]

§§ 285.603-285.613 [Reserved]
163 Activities Under an Approved SAP
§ 285.614 When may I begin conducting activities under my approved SAP?

(a) You may begin conducting the activities approved in your SAP following BOEM approval of your SAP.

(b) If you are installing a facility or a combination of facilities deemed by BOEM to be complex or significant, as provided in 30 CFR 585.613(a)(1), you must comply with the requirements of subpart G of this part and submit the Safety Management System (SMS) description required by § 285.810 before construction may begin.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42715, May 15, 2024]

§ 285.615 What other reports or notices must I submit to BSEE under my approved SAP?

(a) You must notify BSEE in writing within 30 days of completing installation activities approved in your SAP.

(b) You must submit a certification of compliance annually (or other frequency as determined by BOEM) with those terms and conditions of your SAP that BOEM identifies under 30 CFR 585.613(e)(1). Together with your certification, you must submit:

(1) Summary reports that show compliance with the terms and conditions which require certification; and

(2) A statement identifying and describing any mitigation measures and monitoring methods and their effectiveness. If you identified measures that were not effective, you must include your recommendations for new mitigation measures or monitoring methods.

§§ 285.616-285.630 [Reserved]
164 Activities Under an Approved COP
§ 285.631 When must I initiate activities under an approved COP?

After your COP is approved, you must commence construction by the date given in the construction schedule required by 30 CFR 585.626(b)(21), and included as a part of your approved COP, unless BOEM approves a deviation from your schedule.

§ 285.632 What documents must I submit before I may construct and install facilities under my approved COP?

(a) You must submit to BSEE the documents listed in the following table:

Document: | Requirements are found in:

(1) Facility Design Report | § 285.701

(2) Fabrication and Installation Report | § 285.702

(b) You must submit your safety management system, as required by § 285.810.

(c) These activities must fall within the scope of your approved COP. If they do not fall within the scope of your approved COP, you will be required to submit a revision to your COP, under 30 CFR 585.634, for BOEM approval before commencing the activity.

§ 285.633 How do I comply with my COP?

(a) You must submit a certification of compliance annually (or other frequency as determined by BOEM) with certain terms and conditions of your COP that BOEM identifies. Together with your certification, you must submit:

(1) Summary reports that show compliance with the terms and conditions which require certification; and

(2) A statement identifying and describing any mitigation measures and monitoring methods, and their effectiveness. If you identified measures that were not effective, then you must make recommendations for new mitigation measures or monitoring methods.

(b) As provided at § 285.105(i), BSEE may require you to submit any supporting data and information.

§§ 285.634-285.635 [Reserved]
§ 285.636 What notices must I provide BSEE following approval of my COP?

You must notify BSEE in writing of the following events, within the time periods provided:

(a) No later than 30 days after commencing activities associated with the placement of facilities on the lease area under a Fabrication and Installation Report.

(b) No later than 30 days after completion of construction and installation activities under a Fabrication and Installation Report.

(c) At least 7 days before commencing commercial operations.

§ 285.637 When may I commence commercial operations on my commercial lease?

(a) If you are conducting activities on your lease that do not require a FERC license (i.e., wind power projects), then you may commence commercial operations after:

(1) You submit information consistent with § 285.702(c) and (d) for facilities installed prior to commencing commercial operations;

(2) Your CVA submits the project verification report, as described in § 285.708(a)(5), including information required by § 285.708(b)(1), or interim report(s), as described in § 285.712(a) for facilities installed prior to commencing commercial operations;

(3) Your CVA submits the Critical Safety Systems and Equipment commissioning records, as described in § 285.708(a)(6) or interim report(s), as described in § 285.712(a), for facilities installed prior to commencing commercial operations; and

(4) BSEE has not notified you of any objections to the submittals in paragraphs (a)(1) and (3) of this section within the timeframes in §§ 285.700(d) and 285.712(a), as applicable. You may continue commercial operations while BSEE reviews your submittals.

(b) To continue commercial operations as additional facilities complete commissioning, you must submit information in paragraphs (a)(1) and (3) of this section for facilities installed after commercial operations have commenced.

(c) You must notify BSEE within 10 business days after you commence commercial operations.

[89 FR 42715, May 15, 2024]

§ 285.638 What must I do upon completion of my commercial operations as approved in my COP or FERC license?

(a) Upon completion of your approved activities under your COP, you must decommission your project as set forth in subpart I of this part. You must submit your decommissioning application as provided in §§ 285.905 and 285.906.

(b) Upon completion of your approved activities under your FERC license, the terms of your FERC license will govern your decommissioning activities.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42715, May 15, 2024]

§§ 285.639-285.649 [Reserved]
165 Activities Under an Approved GAP
§ 285.650 When may I begin conducting activities under my GAP?

After BOEM approves your GAP, you may begin conducting the approved activities that do not involve a project easement or the construction of facilities on the OCS that BOEM has deemed to be complex or significant.

§ 285.651 When may I construct complex or significant OCS facilities on my limited lease or any facilities on my project easement proposed under my GAP?

If you are applying for a project easement, or installing a facility or a combination of facilities on your limited lease deemed by BOEM to be complex or significant, as provided in 30 CFR 585.648(a)(1), you also must comply with the requirements of subpart G of this part and submit your safety management system description required by § 285.810 before construction may begin.

§ 285.652 [Reserved]
§ 285.653 What other reports or notices must I submit to BSEE under my approved GAP?

(a) You must notify BSEE in writing within 30 days after completing installation activities approved in your GAP

(b) You must annually (or other frequency as determined by BOEM) submit a certification of compliance with those terms and conditions of your GAP that BOEM identifies under 30 CFR 585.648(e)(1). Together with your certification, you must submit:

(1) Summary reports that show compliance with the terms and conditions which require certification; and

(2) A statement identifying and describing any mitigation measures and monitoring methods and their effectiveness. If you identified measures that were not effective, you must include your recommendations for new mitigation measures or monitoring methods.

§§ 285.654-285.659 [Reserved]
Subpart G Facility Design, Fabrication, and Installation
166 Reports
§ 285.700 What reports must I submit to BSEE before installing facilities described in my approved SAP, COP, or GAP?

(a) You must submit the following reports to BSEE before installing facilities described in your approved COP (30 CFR 585.632(a)) and, when required by 30 CFR part 585, in your approved SAP (30 CFR 585.614(b)) or GAP (30 CFR 585.651):

(1) A Facility Design Report (FDR); and

(2) A Fabrication and Installation Report (FIR).

(b) You may submit separate FDRs and FIRs for integrated asset packages unless otherwise agreed to by BSEE (e.g., wind turbine generator (WTG), offshore substation/electrical service platform, array cables, export cables, and seabed preparation). If you submit separate FDRs and FIRs by integrated asset packages, you must:

(1) Ensure FDR(s) and FIR(s) for integrated asset package(s) are complete (e.g., the WTG package includes the RNA, blades, tower, foundation, and transition piece, if applicable);

(2) Explain to BSEE how all FDR(s) and FIR(s) for integrated asset packages will function together effectively in an integrated manner in accordance with your project design; and

(3) Demonstrate that such integration has been verified by your CVA.

(c) You may submit your FDRs and FIRs before or after SAP, COP, or GAP approval.

(d) Subject to the requirements in paragraph (b) of this section, you may commence fabrication and installation of the facilities on the OCS as described in each report:

(1) If BSEE deems your report submitted before SAP, COP, or GAP approval and notifies you of its non-objection to the FDR and FIR or does not respond with objections within 60 business days of SAP, COP, or GAP approval; or

(2) If BSEE deems your report submitted after SAP, COP, or GAP approval and notifies you of its non-objection to the FDR and FIR or does not respond with objections within 60 business days of the report being deemed submitted.

(e) You may commence procurement of discrete parts of the project that are commercially available in standardized form and type-certified components, or fabrication activities that do not take place on the OCS (e.g., manufacturing), prior to the submittal of the reports required under paragraph (a) of this section or any plans required under 30 CFR parts 585 and 586. The procurement and fabrication of facility components allowed under this section are subject to verification and certification by your CVA, and BSEE may object to the installation of said components on the OCS if it considers that the components or their fabrication are inconsistent with accepted industry or engineering standards, the approved SAP, COP, or GAP, the FDR or FIR, or BSEE's regulations.

(f) If BSEE has objections, we will notify you in writing within 60 business days of the report being deemed submitted. Following initial notification of any objections, BSEE may follow up with written correspondence detailing its objections to the report and requesting that certain actions be undertaken. You cannot commence fabrication or installation activities on the OCS that are addressed in such reports until you resolve all objections to BSEE's satisfaction.

[89 FR 42715, May 15, 2024]

§ 285.701 What must I include in my Facility Design Report?

(a) Your Facility Design Report provides specific details of the design of any facilities, including cables and pipelines that are outlined in your BOEM-approved SAP, COP, or GAP. Your Facility Design Report must demonstrate that your design conforms to your responsibilities listed in § 285.105(a). You must include the following items in your Facility Design Report:

Required documents | Required contents

(1) Cover letter | (i) Proposed facility designations: (ii) Lease, ROW grant or RUE grant number; (iii) Area; name and block numbers; and (iv) The type of facility.

(2) Location plat | (i) Latitude and longitude coordinates, Universal Mercator grid-system coordinates, State plane coordinates in the Lambert or Transverse Mercator Projection System;

(ii) Distances in feet from the nearest block lines. These coordinates must be based on the NAD (North American Datum) 83 datum plane coordinate system; and

(iii) The location of any project easements.

(3) Front, Side, and Plan View drawings | (i) Facility dimensions and orientation; (ii) Elevations relative to Mean Lower Low Water; and (iii) Pile sizes and penetration.

(4) Complete set of structural drawings | The approved for construction fabrication drawings should be submitted including, e.g., (i) Cathodic protections systems; (ii) Jacket design; (iii) Pile foundations; (iv) Mooring, tendon and tethering systems; (v) Foundations and anchoring systems; and (vi) Associated cable and pipeline designs.

(5) Summary of environmental data used for design | A summary of the environmental data used in the design or analysis of the facility. Examples of relevant data include information on: (i) Extreme weather; (ii) Seafloor conditions; and (iii) Waves, wind, current, tides, temperature, snow and ice effects, marine growth, and water depth.

(6) Summary of the engineering design data | (i) Loading information (e.g., live, dead, environmental); (ii) Structural information (e.g., design-life; material types; cathodic protection systems; design criteria; fatigue life; jacket design; deck design; production component design; foundation pilings and templates, and mooring, tethering or tendon systems; fabrication and installation guidelines);

(iii) Location of foundation boreholes and foundation piles;

(iv) Foundation information (e.g., soil stability, design criteria); and

(v) For a floating facility, structural integrity, stability, and ballast information. This includes foundations, piles, templates, anchors or anchor systems, mooring, tethering and tendon systems.

(7) A complete set of design calculations | Self-explanatory.

(8) Project-specific studies used in the facility design or installation | All studies pertinent to facility design or installation, e.g., oceanographic and soil reports including the results of the survey required in 30 CFR 585.610(b), 585.626(b), or 585.645(b).

(9) Description of the loads imposed on the facility | (i) Loads imposed by the jacket; (ii) Decks; (iii) Production components; (iv) Foundations, foundation pilings and templates, and anchoring systems; and (v) Mooring, tendon or tethering systems.

(10) Geotechnical reports | Reports and supporting data from geotechnical surveys, in situ explorations, laboratory tests, analyses, burial or drivability assessments, and recommended design parameters.

(11) Design Standards | The industry standards you will apply to ensure the facilities are designed to meet § 285.105.

(12) Critical Safety Systems and Equipment | A risk assessment that identifies the Critical Safety Systems and Equipment and a description of the identified Critical Safety System and Equipment.

(13) Other information | Additional information required by BSEE.

(b) For any floating facility, your design must meet the requirements of the U.S. Coast Guard for structural integrity and stability (e.g., verification of center of gravity) as listed in paragraph (a)(6)(v) of this section. The design must also consider:

(1) Foundations, foundation pilings and templates, and anchoring systems; and

(2) Mooring, tendon, or tethering systems.

(c) You must submit your FDR to BSEE pursuant to § 285.110 and provide the location of records, as required in § 285.714(c).

(d) If you are required to use a CVA, the FDR must include the following certification statement with accompanying justification: “The design of this structure has been certified by a BSEE-approved CVA to be in accordance with accepted engineering practices and the approved SAP, GAP, or COP, as applicable, and has been designed to provide for safety. The certified design and as-built plans and specifications will be on file at [provide location].”

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42715, May 15, 2024]

§ 285.702 What must I include in my Fabrication and Installation Report?

(a) Your Fabrication and Installation Report must describe how your facilities will be fabricated and installed in accordance with the design criteria identified in the Facility Design Report; your BOEM-approved SAP, COP, or GAP; and generally accepted industry standards and practices. Your Fabrication and Installation Report must demonstrate how your facilities will be fabricated and installed in a manner that conforms to your responsibilities listed in § 285.105(a). You must include the following items in your Fabrication and Installation Report:

Required documents | Required contents

(1) Cover letter | (i) Proposed facility designation, lease, ROW grant, or RUE grant number; (ii) Area, name, and block number; and (iii) The type of facility.

(2) Schedule | Fabrication and installation schedule information.

(3) Fabrication information | The industry standards you will use to ensure the facilities are fabricated to the design criteria identified in your Facility Design Report.

(4) Installation process information | Details associated with the deployment activities, equipment, and materials, including onshore and offshore equipment and support, and anchoring and mooring patterns.

(5) Federal, State, and local permits (e.g., EPA, Army Corps of Engineers) | Either one copy of the permit or information on the status of the application.

(6) Quality assurance | Certificates ensuring adherence to a nationally or internationally recognized quality assurance standard. Alternate means of compliance must be approved on a case-by-case basis.

(7) Environmental information | Information about: (i) Water discharge; (ii) Waste disposal; (iii) Vessel information; (iv) Onshore waste receiving treatment or disposal facilities; and (v) If you submitted this data as part of your SAP, COP, or GAP, you may incorporate the information by reference.

(8) Commissioning procedures for Critical Safety Systems and Equipment | Original equipment manufacturer procedures or other BSEE accepted engineering practices for commissioning of Critical Safety Systems and Equipment as identified in § 285.701(a)(12).

(9) Project easement | Information about installation of any cables, pipelines, or facilities. Information on burial methods and vessels.

(10) Other information | Additional information required by BSEE.

(b) You must submit your FIR to BSEE pursuant to § 285.110.

(c) You must provide the location of records, as required in § 285.714(c).

(d) If you are required to use a CVA, the FIR must include the following certification statement with accompanying justification: “The fabrication and installation of this structure has been certified by a BSEE-approved CVA to be in accordance with accepted engineering practices, the FDR, and the approved SAP, GAP, or COP, as applicable. The certified design and as-built plans and specifications will be on file at [provide location].”

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42716, May 15, 2024]

§ 285.703 What reports must I submit for project modifications and repairs?

(a) You must submit a Project Modification or Repair Report to BSEE in which you certify that major repairs and major modifications of renewable energy structures and crucial components to a completed project conform to accepted engineering practices.

(1) A “major repair” is a corrective action involving structural members affecting the structural integrity of all or a portion of the facility or substantial repair of a Critical Safety Systems and Equipment, including those identified in your FDR.

(2) A “major modification” is an alteration involving structural members affecting the structural integrity of all or a portion of the facility or substantial alteration of Critical Safety Systems and Equipment, including those as identified in your FDR.

(b) The report must also identify the location of all records pertaining to the major repairs or major modifications, as required in § 285.714(c).

(c) If you are required to use a CVA, the report described in paragraph (a) of this section must include the following certification statement with accompanying justification: “The [major modification or major repair] of this [structure or Critical Safety Systems and Equipment] has been certified by a BSEE-approved CVA to be in accordance with accepted engineering practices, the FDR, and the approved SAP, GAP, or COP as applicable.”

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42717, May 15, 2024]

§ 285.704 After receiving the FDR, FIR, or project verification reports, what will BSEE do?

(a) Determine whether the report is deemed submitted. Within 20 business days after receiving your proposed FDR, FIR, or project verification report, BSEE will review your submission. BSEE will deem your FDR, FIR, or project verification report submitted if BSEE determines it is sufficiently complete and accurate to fulfill the applicable requirements of § 285.701, § 285.702, or § 285.712.

(b) Identify problems and deficiencies. If BSEE determines that your submission has not met the conditions in paragraph (a) of this section, BSEE will notify you of the problem or deficiency within 20 business days after BSEE receives your FDR, FIR, or project verification report. BSEE will not deem your FDR, FIR, or project verification report submitted until you have corrected all problems or deficiencies identified in the notice.

(c) Notify you when the report is deemed submitted. BSEE will notify you when the FDR, FIR, or project verification reports are deemed submitted. If BSEE has not notified you within 20 business days that your report has problems or deficiencies, it is deemed submitted. Until your report is deemed submitted, the time period in § 285.700(d) does not begin running.

[89 FR 42717, May 15, 2024]

167 Certified Verification Agent
§ 285.705 When must I use a Certified Verification Agent (CVA)?

(a) Unless BSEE waives this requirement under paragraph (c) of this section, you must use one or more CVAs to review and verify your FDRs, FIRs, and the Project Modification and Repair Reports.

(b) The purpose of a CVA is to:

(1) Ensure that your facilities are designed, fabricated, and installed in conformance with accepted engineering practices and the FDR(s) and FIR(s); and that the design of the facilities is suitable for the location where they will be installed;

(2) Ensure Critical Safety Systems and Equipment are commissioned in accordance with the procedures identified in § 285.702(a)(8);

(3) Ensure that major repairs and major modifications are completed in conformance with accepted engineering practices; and

(4) Provide BSEE and you with reports of all incidents that affect the facility design, fabrication, and installation, including commissioning of Critical Safety Systems and Equipment, for the project and its components.

(c) BSEE may waive in whole or in part the requirement that you use a CVA if you can demonstrate the following:

If you demonstrate that . . . | Then BSEE may waive the requirement for a CVA for the following:

(1) The facility design conforms to a standard design that has been used successfully in a similar environment, and the installation design conforms to accepted engineering practices | The design of your structure(s).

(2) The relevant fabricator has successfully fabricated similar facilities, and the facility will be fabricated in conformance with accepted engineering practices and to a nationally or internationally recognized quality assurance standard | The fabrication of your structure(s).

(3) The installation company has successfully installed similar facilities in a similar offshore environment, and your structures will be installed in conformance with accepted engineering practices | The installation of your structure(s).

(4) Major repairs or major modifications will be completed in conformance with accepted engineering practices and to a nationally or internationally recognized quality assurance standard | The major repair or major modification on your structure(s).

(d) You must submit a request to waive, in whole or in part, the requirement to use a CVA to BSEE in writing.

(1) BSEE will review your request to waive, in whole or in part, the use of the CVA and notify you of its decision.

(2) If BSEE does not waive, in whole or in part, the requirement for a CVA, you may file an appeal under § 285.118.

(3) If BSEE waives, in whole or in part, the requirement that you use a CVA, your project engineer must perform the same duties and responsibilities as would have the CVA, except as otherwise provided. You must submit the project engineer's qualifications to BSEE as a part of your waiver request to demonstrate that your project engineer is a professional engineer with relevant experience and expertise in the facilities they will be verifying/certifying.

[89 FR 42717, May 15, 2024]

§ 285.706 How do I nominate a CVA for BSEE approval?

(a) A CVA must be nominated by the lessee and approved by BSEE before conducting any verification or certification activities for which they have been nominated. If you intend to use multiple CVAs, you must nominate a general project CVA who will manage the overall project verification and certification approach and who will ensure consistency and oversight among the CVAs, especially in transition areas between different CVAs. The general project CVA must be nominated no later than COP submission.

(b) For each CVA that you nominate, you must submit to BSEE a list of documents used in your design that you will forward to the CVA and a qualification statement that includes the following:

(1) Previous experience in third-party verification or experience in the design, fabrication, installation, or major modification of offshore energy facilities;

(2) Technical capabilities of the individual or the primary staff for the specific project, including relevant professional licenses, certifications, and accreditations;

(3) Size and type of organization or corporation;

(4) In-house availability of, or access to, appropriate technology (including computer programs, hardware, and testing materials and equipment);

(5) Ability to perform the CVA functions for the specific project considering current commitments;

(6) Previous experience with BOEM and BSEE requirements and procedures, if any; and

(7) The scope and level of work to be performed by the CVA, including all relevant reports and facilities that the CVA will verify or certify.

(c) Individuals or organizations acting as CVAs must not function in any capacity that will create a conflict of interest or the appearance of a conflict of interest. The CVA must not have prepared, or been directly involved in, any work related to the preparation of design, fabrication, installation, modification, or repair plans for which they will provide verification or certification services.

(d) The verification and certification must be conducted by or under the direct supervision of a registered professional engineer.

(e) BSEE will approve or disapprove your CVA as part of BOEM's review of your COP or, when required, of your SAP or GAP.

(f) You must nominate a new CVA for BSEE approval if the previously approved CVA:

(1) Is no longer able to serve in a CVA capacity for the project; or

(2) No longer meets the requirements for a CVA set forth in this subpart.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42717, May 15, 2024]

§ 285.707 What are the CVA's primary duties for facility design review?

If you are required to use a CVA:

(a) The CVA must use good engineering judgment and practices in conducting an independent assessment of the design of the facility. The CVA must verify to BSEE that the facility is designed to withstand the environmental and functional load conditions appropriate for the intended service life at the proposed location and has been designed to minimize risk to personnel as required by § 285.105(a).

(b) The CVA must conduct an independent assessment of all proposed:

(1) Planning criteria;

(2) Operational requirements;

(3) Environmental loading data;

(4) Load determinations;

(5) Stress analyses;

(6) Material designations;

(7) Soil and foundation conditions;

(8) Safety factors;

(9) Risk assessments supporting the design for human safety and how the results are used in the design; and

(10) Other pertinent parameters of the proposed design.

(c) For any floating facility, the CVA or project engineer must also verify that any requirements of the U.S. Coast Guard for structural integrity and stability (e.g., verification of center of gravity), have been met. The CVA must also consider:

(1) Foundations, foundation pilings and templates, and anchoring systems; and

(2) Mooring, tendon or tethering systems.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42718, May 15, 2024]

§ 285.708 What are the CVA's or project engineer's primary duties for fabrication and installation review?

(a) The CVA or project engineer must do all of the following:

(1) Use good engineering judgment and practice in conducting an independent assessment of the fabrication and installation activities and of the commissioning of Critical Safety Systems and Equipment;

(2) Monitor the fabrication and installation of the facility and the commissioning of Critical Safety Systems and Equipment as required by paragraph (b) of this section;

(3) Make periodic onsite inspections while fabrication is in progress and verify the items required by § 285.709;

(4) Make periodic onsite inspections while installation is in progress and satisfy the requirements of § 285.710;

(5) Certify in Project Verification Reports that project components are fabricated and installed in accordance with accepted engineering practices and to a nationally or internationally recognized quality assurance standard or to an equivalent alternate means of quality assurance considered on a case-by-case basis, your BOEM-approved SAP, COP, or GAP (as applicable), and your FIR. If multiple CVAs are involved in your project, the general project CVA must submit the final report containing such certification for the project. The Project Verification Report must identify the location of all records pertaining to facility fabrication and installation as required in § 285.714(c);

(6) Provide records documenting that Critical Safety Systems and Equipment are commissioned in accordance with the procedures identified in § 285.702(a)(8); and

(7) Identify the location of all records pertaining to commissioning of Critical Safety Systems and Equipment, as required in § 285.714(c).

(b) To comply with paragraphs (a)(4) and (5) of this section, the CVA or project engineer must monitor the fabrication and installation of the facility and the commissioning of Critical Safety Systems and Equipment to certify that they have been built and installed according to your FDRs and FIRs.

(1) If the CVA or project engineer finds that either fabrication and installation procedures or Critical Safety Systems and Equipment commissioning procedures, or both, have been changed or design specifications have been modified, the CVA or project engineer must inform you and BSEE; and

(2) If you accept the modifications, you must also inform BSEE.

[89 FR 42718, May 15, 2024]

§ 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?

(a) To comply with § 285.708(a)(3), the CVA or project engineer must make periodic onsite inspections while fabrication is in progress and must verify the following fabrication items, as appropriate:

(1) Quality control by lessee (or grant holder) and builder;

(2) Fabrication site facilities;

(3) Material quality and identification methods;

(4) Fabrication procedures specified in your FIRs and adherence to such procedures;

(5) Welder and welding procedure qualification and identification;

(6) Structural tolerances specified, and adherence to those tolerances;

(7) Nondestructive examination requirements and evaluation results of the specified examinations;

(8) Destructive testing requirements and results;

(9) Repair procedures;

(10) Installation of corrosion-protection systems and splash-zone protection;

(11) Erection procedures to ensure that overstressing of structural members does not occur;

(12) Alignment procedures;

(13) Dimensional check of the overall structure, including any turrets, turret-and-hull interfaces, any mooring line and chain and riser tensioning line segments, and tendon or tethering systems; and

(14) Status of quality-control records at various stages of fabrication.

(b) For any floating facility, the CVA or project engineer must also verify that any requirements of the U.S. Coast Guard for structural integrity and stability (e.g., verification of center of gravity) have been met. The CVA or project engineer must also consider:

(1) Foundations, foundation pilings and templates, and anchoring systems; and

(2) Mooring, tendon, or tethering systems.

[89 FR 42719, May 15, 2024]

§ 285.710 When conducting onsite installation inspections, what must the CVA or project engineer do?

(a) To comply with § 285.708(a)(4), the CVA or project engineer must make periodic onsite inspections while installation is in progress and must, as appropriate, verify, witness, survey, or check the installation and commissioning of items required by this section.

(b) The CVA or project engineer must verify, as appropriate, all of the following:

(1) Loadout and initial flotation procedures;

(2) Towing operation procedures to the specified location, including a review of the towing records;

(3) Launching and uprighting activities;

(4) Submergence activities;

(5) Pile or anchor installations;

(6) Installation of mooring, tendon, and tethering systems;

(7) Final deck and component installations;

(8) Installation at the locations set forth in your FDR(s) and FIR(s); and

(9) Commissioning of Critical Safety Systems and Equipment.

(c) For a fixed or floating facility, the CVA or project engineer must verify that proper procedures were used during the following:

(1) The loadout of the jacket, decks, piles, or structures from each fabrication site;

(2) The actual installation of the facility or major modification and the related installation activities; and

(3) Commissioning of Critical Safety Systems and Equipment.

(d) For a floating facility, the CVA or project engineer must verify structural integrity, stability, and ballast, and that proper procedures were used during the following:

(1) The loadout of the facility;

(2) The installation of foundation pilings and templates, and anchoring systems; and

(3) The installation of the mooring and tethering and tendon systems.

(e) The CVA or project engineer must conduct an onsite inspection of the installed facility as approved in your CVA scope of work.

(f) The CVA or project engineer must make periodic onsite inspections to witness the commissioning of Critical Safety Systems and Equipment in order to verify that:

(1) The Critical Safety Systems and Equipment function as designed; and

(2) The final commissioning Critical Safety Systems and Equipment records are complete.

(g) The CVA or project engineer must spot-check the equipment, procedures, and recordkeeping as necessary to determine compliance with the applicable documents incorporated by reference and the regulations under this part.

[89 FR 42719, May 15, 2024]

§ 285.711 [Reserved]
§ 285.712 What are the CVA's or project engineer's reporting requirements?

(a) The CVA or project engineer must prepare and submit to you and BSEE all reports and records required by this subpart. The CVA or project engineer must also submit interim reports to you and BSEE, as requested by BSEE. BSEE will review and respond within 30 days.

(b) For each report required by this subpart, the CVA or project engineer must submit the final report to BSEE pursuant to § 285.110. In each report, the CVA or project engineer must:

(1) Give details of how, by whom, and when the CVA or project engineer activities were conducted;

(2) Describe the CVA's or project engineer's activities during the verification process;

(3) Summarize the CVA's or project engineer's findings; and

(4) Provide any additional comments that the CVA or project engineer deems necessary.

(5) Summarize any issues with the design and any incidents during facility fabrication and installation, or Critical Safety System and Equipment commissioning, and how those issues were resolved.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42717, May 15, 2024]

§ 285.713 [Reserved]
§ 285.714 What records relating to FDRs, FIRs, and Project Modification and Repair Reports must I keep?

(a) Until BOEM releases your financial assurance under 30 CFR 585.534, you must compile, retain, and make available to BSEE, within the time specified by BSEE, all of the following:

(1) The as-built drawings;

(2) The design assumptions and analyses;

(3) A summary of the fabrication and installation examination records;

(4) The records of the commissioning of Critical Safety Systems and Equipment;

(5) The inspection results from the inspections and assessments required by §§ 285.820 through 285.825; and

(6) Records of repairs not covered in the inspection report submitted under § 285.824(b)(3).

(b) You must record and retain the original material test results of all primary structural materials during all stages of construction until BOEM releases your financial assurance under 30 CFR 585.534. Primary material is material that, should it fail, would lead to a significant reduction in facility safety, structural reliability, or operating capabilities. Items such as steel brackets, deck stiffeners and secondary braces or beams would not generally be considered primary structural members (or materials).

(c) You must provide BSEE with the location of these records, as required in §§ 285.701(c) and (d), 285.702(c) and (d), 285.703(b), and 285.708(a)(5) and (7).

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42717, May 15, 2024]

Subpart H Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs and GAPs
§ 285.800 How must I conduct my activities to comply with safety and environmental requirements?

(a) You must conduct all activities on your lease or grant under this part in a manner that conforms with your responsibilities in § 285.105(a), and using:

(1) Trained personnel; and

(2) Technologies, precautions, and techniques that will not cause undue harm or damage to natural resources, including their physical, atmospheric, and biological components.

(b) You must certify compliance with those terms and conditions identified in your approved SAP, COP, or GAP, as required under § 285.615(b), § 285.633(a), or § 285.653(b).

§ 285.801 How must I conduct my approved activities to protect marine mammals, threatened and endangered species, and designated critical habitat?

You must comply with all measures required under 30 CFR 585.701.

§ 285.802 What must I do if I discover a potential archaeological resource while conducting my approved activities?

You must comply with all measures required under 30 CFR 585.702.

§ 285.803 How must I conduct my approved activities to protect essential fish habitats identified and described under the Magnuson-Stevens Fishery Conservation and Management Act?

You must comply with all measures required under 30 CFR 585.703.

§§ 285.804-285.809 [Reserved]
168 Safety Management Systems
§ 285.810 When must I submit a Safety Management System (SMS) and what must I include in my SMS?

You are required to use a Safety Management System (SMS) for activities conducted on the OCS to develop or operate a lease, from met buoy placement and site assessment work through decommissioning, and to provide your SMS to BSEE upon request. You must also submit a detailed description of the SMS with your COP (as provided in 30 CFR 585.627(d)) and, when required by this part, your SAP (as provided in § 285.614(b)) or GAP (as provided in § 285.651). Your SMS must address:

(a) How you will ensure the safety of your personnel or anyone else on or near your facilities, such as:

(1) Health and safety risks that anyone on your facilities or engaged in lease activities are likely to face during activities covered by the SMS;

(2) Policies and strategies that will be used to control such risks;

(3) Procedures and nationally or internationally recognized standards that will be followed to ensure the safety of the activities covered by the SMS;

(4) Methods that will be used to monitor the implementation of the SMS and maintain the safety of activities covered by the SMS, including management of change and stop work practices; and

(5) Procedures for personnel to report unsafe work conditions both to the lessee or its designated operator and to BSEE.

(b) Remote monitoring, control, and shut down capabilities, such as:

(1) Aspects of operations and mechanical and structural integrity that will be monitored remotely;

(2) Circumstances under which remote monitoring will be activated and how it will be maintained;

(3) Maintenance of the security of the remote sensing and control capabilities;

(4) Monitoring of conditions if remote sensing equipment fails; and

(5) Conditions that will result in the shutdown of one or more facilities.

(c) Emergency response procedures, such as:

(1) Types of incidents to be addressed (e.g., serious injury to workers during maintenance, unexploded ordnance encountered during construction, damage due to hurricane or allision by vessels or aircraft, unauthorized access into remote monitoring capabilities, evacuation, and search and rescue);

(2) Potential response activities, including U.S. Coast Guard (USCG), other government agencies, and contractor support, for each category of incident;

(3) Management controls, authorities, and reporting to be employed for each response;

(4) Locations from which emergency response will be controlled; and

(5) Resources available to assist in the response.

(d) Fire suppression equipment, such as a description of how and when it will be used, if needed.

(e) How and when you will test your SMS, such as:

(1) Plans, processes, and schedules for:

(i) Self or third-party auditing of the SMS; and

(ii) Regular testing of certain SMS components, including remote shutdown capabilities and emergency response readiness; and

(2) Corrective action processes to improve the effectiveness of your SMS based on the results of audits, tests, investigations of incidents (including near-misses), feedback from the field, and other information sources.

(f) How you will ensure personnel who conduct activities on your facilities are properly trained and have the capability to safely perform duties, such as:

(1) Required training for personnel who conduct activities on your facilities; and

(2) Required knowledge and skills to ensure that personnel perform duties safely for the duration of activities.

[89 FR 42720, May 15, 2024]

§ 285.811 Am I required to obtain a certification of my SMS?

You are not required to obtain a certification that your SMS meets acceptable health and safety standards (e.g., ANSI/ASSP Z10.0, API RP 75, ISO 45001) from a recognized accreditation organization. However, BSEE will consider such certification in determining the frequency and scope of SMS-related inspections that it conducts under this subpart, as well as the scope and nature of its oversight over any audit-induced corrective actions.

[89 FR 42720, May 15, 2024]

§ 285.812 How must I implement my SMS?

(a) Your SMS must be functional before you begin, and must remain functional while you perform, any activity on the OCS pursuant to a lease, including met buoy placement and site assessment work, or for any activities described in your approved SAP, COP, or GAP. You must conduct all activities described in your approved SAP, COP, or GAP in accordance with the SMS you described under § 285.810.

(b) You must regularly demonstrate to BSEE that your SMS is being implemented effectively by submitting the following to BSEE in accordance with § 285.110:

(1) By March 31st of each year, summarize safety and work hour performance data for the prior calendar year in which you conducted site assessment, construction, operations, or decommissioning activities in accordance with your lease terms, using a form available on the BSEE website; and

(2) Once every 3 years and upon BSEE's request, provide a report to BSEE summarizing the results of your most recent SMS audit, corrective actions implemented or being implemented as a result of that audit, and an updated description of your SMS highlighting changes that were made since the last such submission to BSEE.

[89 FR 42720, May 15, 2024]

169 Maintenance and Shutdowns
§ 285.813 When do I have to report removing equipment from service?

(a) The removal of any equipment from service may result in BSEE applying remedies, as provided in this part, when such equipment is necessary for implementing your approved plan. Such remedies may include an order from BSEE requiring you to replace or remove such equipment or facilities.

(b)(1) You must report within 24 hours when equipment necessary for implementing your approved plan is removed from service for more than 12 hours. If you provide an oral notification, you must submit a written confirmation of this notice within 3-business days, as required by § 285.105(c);

(2) You do not have to report removing equipment necessary for implementing your plan if the removal is part of planned maintenance or repair activities; and

(3) You must notify BSEE when you return the equipment to service.

§ 285.814 [Reserved]
170 Equipment Failure and Adverse Environmental Effects
§ 285.815 What must I do if I have facility damage or an equipment failure?

(a) If you have facility damage or the failure of a pipeline, cable, or other equipment necessary for you to implement your approved plan, you must make repairs as soon as practicable. If you have a major repair, you must submit a report to BSEE under § 285.703.

(b) If you are required to report any facility damage or failure under § 285.831, BOEM may require you to revise your SAP, COP, or GAP to describe how you will address the facility damage or failure as required by 30 CFR 585.634 (COP), 585.617 (SAP), or 585.655 (GAP). You must submit a report of the repairs to BSEE, as required in § 285.703.

(c) BSEE may require that you analyze cable, pipeline, or facility damage or failure to determine the cause. If requested by BSEE, you must submit a comprehensive written report of the failure or damage to BSEE as soon as available.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42720, May 15, 2024]

§ 285.816 What must I do if environmental or other conditions adversely affect a cable, pipeline, or facility?

If environmental or other conditions adversely affect a cable, pipeline, or facility so as to endanger the safety or the environment, you must:

(a) Submit a plan of corrective action to BSEE within 30 days of the discovery of the adverse effect.

(b) Take remedial action as described in your corrective action plan.

(c) Submit to the BSEE a report of the remedial action taken within 30 days after completion.

§§ 285.817-285.819 [Reserved]
171 Inspections and Assessments
§ 285.820 Will BSEE conduct inspections?

BSEE may inspect OCS facilities and any vessels engaged in activities authorized under this part. When we conduct these inspections, we will:

(a) Verify that you are conducting activities in compliance with subsection 8(p) of the OCS Lands Act; the regulations in this part; the terms, conditions, and stipulations of your lease or grant; approved plans; and other applicable laws and regulations.

(b) Determine whether proper safety equipment has been installed and is operating properly according to your SMS, as required in § 285.810.

[89 42720, May 15, 2024]

§ 285.821 Will BSEE conduct scheduled and unscheduled inspections?

BSEE may conduct both scheduled and unscheduled inspections.

[89 FR 42721, May 15, 2024]

§ 285.822 What must I do when BSEE conducts an inspection?

(a) When BSEE conducts an inspection, you must:

(1) Provide access to all facilities on your lease (including your project easement) or grant and any vessels engaged in activities authorized under this part; and

(2) Make the following available for BSEE to inspect:

(i) The area covered under a lease, ROW grant, or RUE grant;

(ii) All improvements, structures, and fixtures on these areas; and

(iii) All records of design, construction, operation, maintenance, repairs, or investigations on or related to the area.

(b) You must retain the records referenced in paragraph (a)(2)(iii) of this section until BOEM releases your financial assurance under 30 CFR585.534 and provide them to BSEE upon request within the time period specified by BSEE.

(c) You must demonstrate to the inspector how you are in compliance with your safety management system.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42721, May 15, 2024]

§ 285.823 Will BSEE reimburse me for my expenses related to inspections?

Upon request, BSEE will reimburse you for food, quarters, and transportation that you provide for our representatives while they inspect your lease or grant facilities and associated activities. You must send us your reimbursement request within 90 days of the inspection.

§ 285.824 How must I conduct self-inspections?

(a) You must develop a comprehensive self-inspection plan covering all of your facilities. You must keep this self-inspection plan wherever you keep your records and make it available to BSEE upon request. Your self-inspection plan must specify:

(1) The type, extent, and frequency of inspections that you will conduct for both the above-water and the below-water structures of all facilities and pertinent components of the mooring, tendon, or tethering systems for any floating facilities;

(2) How you will monitor the corrosion protections for both above-water and below-water structures; and

(3) How you will fulfill the requirement for annual on-site inspection of all Critical Safety Systems and Equipment.

(b) You must conduct an onsite inspection of each of your facilities at least once a year. This inspection must include, but is not limited to, all Critical Safety Systems and Equipment.

(1) You must develop and retain summary reports for all such inspections for each calendar year. The summary report must note any failures of operability, required maintenance of Critical Safety Systems and Equipment, or required replacement of the Critical Safety Systems and Equipment identified during inspection.

(2) You must retain records of inspections and summary reports for the previous 2 calendar years and make them available to BSEE on request.

(c) You must submit a report annually to BSEE no later than November 1st that must include:

(1) A list of facilities inspected for structural condition and corrosion protection in the preceding 12 months;

(2) The type of inspection employed (i.e., visual, magnetic particle, ultrasonic testing); and

(3) A summary of the inspection indicating what repairs, if any, were needed and the overall structural condition of the facility.

[89 FR 42721, May 15, 2024]

§ 285.825 When must I assess my facilities?

(a) You must perform an assessment of the structure, when needed, based on the platform assessment initiators listed in sections 17.2.1-17.2.5 of API RP 2A-WSD (incorporated by reference, see § 285.115).

(b) You must initiate mitigation actions for structures that do not pass the assessment process of API RP 2A-WSD.

(c) You may comply with a later edition of API RP 2A-WSD only if:

(1) You show that complying with the later edition provides a degree of protection, safety, or performance equal to or better than what would be achieved by compliance with the listed edition; and

(2) You obtain the prior written approval for alternative compliance from the authorized BSEE official.

(d) You must perform other assessments as required by BSEE.

§§ 285.826-285.829 [Reserved]
172 Incident Reporting and Investigation
§ 285.830 What are my incident reporting requirements?

(a) You must report all incidents listed in § 285.831 to BSEE, according to the reporting requirements for these incidents in §§ 285.832 through 285.833.

(b) These reporting requirements apply to incidents that occur on the area covered by your lease or grant and that are related to activities resulting from the exercise of your rights under your lease or grant.

(c) Nothing in this subpart relieves you from providing notices and reports of incidents that may be required by other regulatory agencies.

(d) You must report all spills of oil or other liquid pollutants in accordance with 30 CFR 250.187(d).

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42721, May 15, 2024]

§ 285.831 What incidents must I report, and when must I report them?

(a) You must report the following incidents to us immediately via oral communication, and provide a written follow-up report (paper copy or electronically transmitted) within 15-business days after the incident:

(1) Fatalities;

(2) Incidents that require the evacuation of person(s) from the facility to shore or to another offshore facility;

(3) Fires and explosions;

(4) Collisions that result in property or equipment damage greater than $25,000. (Collision means the act of a moving vessel (including an aircraft) striking another vessel, or striking a stationary vessel or object. Property or equipment damage means the cost of labor and material to restore all affected items to their condition before the damage, including, but not limited to, the OCS facility, a vessel, a helicopter, or the equipment. It does not include the cost of salvage, cleaning, dry docking, or demurrage);

(5) Incidents involving structural damage to an OCS facility that is severe enough so that activities on the facility cannot continue until repairs are made;

(6) Incidents involving crane or personnel/material handling activities, if they result in a fatality, injury, structural damage, or significant environmental damage;

(7) Incidents that damage or disable safety systems or equipment (including firefighting systems);

(8) Other incidents resulting in property or equipment damage greater than $25,000; and

(9) Any other incidents involving significant environmental damage, or harm.

(b) You must provide a written report of the following incidents to us within 15 days after the incident:

(1) Any injuries that result in the injured person not being able to return to work or to all of their normal duties the day after the injury occurred; and

(2) All incidents that require personnel on the facility to muster for evacuation for reasons not related to weather or drills.

§ 285.832 How do I report incidents requiring immediate notification?

For an incident requiring immediate notification under § 285.831(a), you must notify BSEE verbally after aiding the injured and stabilizing the situation. Your verbal communication must provide the following information:

(a) Date and time of occurrence;

(b) Identification and contact information for the lessee, grant holder, or operator;

(c) Contractor, and contractor representative's name and telephone number (if a contractor is involved in the incident or injury/fatality);

(d) Lease number, OCS area, and block;

(e) Platform/facility name and number, or cable or pipeline segment number;

(f) Type of incident or injury/fatality;

(g) Activity at time of incident; and

(h) Description of the incident, damage, or injury/fatality.

§ 285.833 What are the reporting requirements for incidents requiring written notification?

(a) For any incident covered under § 285.831, you must submit a written report within 15 days after the incident to BSEE. The report must contain the following information:

(1) Date and time of occurrence;

(2) Identification and contact information for each lessee, grant holder, or operator;

(3) Name and telephone number of the contractor and the contractor's representative, if a contractor is involved in the incident or injury;

(4) Lease number, OCS area, and block;

(5) Platform/facility name and number, or cable or pipeline segment number;

(6) Type of incident or injury;

(7) Activity at time of incident;

(8) Description of incident, damage, or injury (including days away from work, restricted work, or job transfer), and any corrective action taken; and

(9) Property or equipment damage estimate (in U.S. dollars).

(b) You may submit a report or form prepared for another agency in lieu of the written report required by paragraph (a) of this section if the report or form contains all required information.

(c) BSEE may require you to submit additional information about an incident on a case-by-case basis.

Subpart I Decommissioning
173 Decommissioning Obligations and Requirements
§ 285.900 Who must meet the decommissioning obligations in this subpart?

(a) Lessees are jointly and severally responsible for meeting decommissioning obligations for facilities on their leases, including all obstructions, as the obligations accrue and until each obligation is met.

(b) Grant holders are jointly and severally liable for meeting decommissioning obligations for facilities on their grant, including all obstructions, as the obligations accrue and until each obligation is met.

(c) If a lessee or grant holder has installed a facility on a lease or grant that was authorized by an authority other than BOEM and that approving authority has imposed a decommissioning obligation, such obligation will substitute for the requirements of this subpart. The decommissioning requirements in this subpart will apply to such a facility if the authorizing agency has not imposed or enforced a decommissioning obligation.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42721, May 15, 2024]

§ 285.901 When do I accrue decommissioning obligations?

You accrue decommissioning obligations when you are or become a lessee or grant holder, and you either install, construct, or acquire by a BOEM-approved assignment a facility, cable, or pipeline, or you create an obstruction to other uses of the OCS.

§ 285.902 What are the general requirements for decommissioning for facilities authorized under my SAP, COP, or GAP?

(a) Except as otherwise authorized under § 285.909, within 2 years following termination of a lease or grant, or earlier if BSEE determines a facility is no longer useful for operations, you must:

(1) Remove or decommission all facilities, projects, cables, pipelines, and obstructions;

(2) Clear the seafloor of all obstructions created by activities on your lease, including your project easement, or grant.

(b) Before decommissioning the facilities under your SAP, COP, or GAP, you must submit a decommissioning application to, and receive approval from, BSEE.

(c) The approval of the decommissioning concept in the SAP, COP, or GAP is not an approval of a decommissioning application. However, you may submit your complete decommissioning application to BSEE simultaneously with the SAP, COP, or GAP, so that it may undergo appropriate technical and regulatory reviews at that time.

(d) Following approval of your decommissioning application, you must submit a decommissioning notice under § 285.908 to BSEE at least 60 days before commencing decommissioning activities.

(e) If you, your subcontractors, or any agent acting on your behalf discovers any archaeological resource while conducting decommissioning activities, you must immediately halt bottom-disturbing activities within 1,000 feet of the discovery and report the discovery to us within 72 hours. BOEM will inform you how to conduct investigations to determine if the resource is significant and how to protect it in accordance with 30 CFR 585.702. You, your subcontractors, or any agent acting on your behalf must keep the location of the discovery confidential and must not take any action that may adversely affect the archaeological resource until we have made an evaluation and told you how to proceed.

(f) Provide BOEM with documentation of any coordination efforts you have made with the affected States, local, and Tribal governments.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42721, May 15, 2024]

§ 285.903 What are the requirements for decommissioning FERC-licensed hydrokinetic facilities?

You must comply with the decommissioning requirements in your BOEM-issued lease. If you fail to comply with the decommissioning requirements of your lease then:

(a) BOEM may call for the forfeiture of your bond or other financial assurance;

(b) You remain liable for removal or disposal costs and responsible for accidents or damages that might result from such failure; and

(c) BSEE may take enforcement action under § 285.400.

§ 285.904 Can I request a departure from the decommissioning requirements?

You may request a departure from the decommissioning requirements under § 285.103.

174 Decommissioning Applications
§ 285.905 When must I submit my decommissioning application?

You must submit your decommissioning application upon the earliest of the following dates:

(a) Two (2) years before the expiration of your lease.

(b) Ninety (90) days after completion of your commercial activities on a commercial lease.

(c) Ninety (90) days after completion of your approved activities under a limited lease on a ROW grant or RUE grant.

(d) Ninety (90) days after cancellation, relinquishment, or other termination of your lease or grant.

(e) Ninety (90) calendar days after BSEE determines a facility is no longer useful for operations.

[88 FR 6413, Jan. 31, 2023, as amended at 89 FR 42721, May 15, 2024]

§ 285.906 What must my decommissioning application include?

You must provide one paper copy and one electronic copy of the application. Include the following information in the application, as applicable.

(a) Identification of the applicant including:

(1) Lease operator, ROW grant holder, or RUE grant holder;

(2) Address;

(3) Contact person and telephone number; and

(4) Shore base.

(b) Identification and description of the facilities, cables, or pipelines you plan to remove or propose to leave in place, as provided in § 285.909.

(c) A proposed decommissioning schedule for your lease, ROW grant, or RUE grant, including the expiration or relinquishment date and proposed month and year of removal.

(d) A description of the removal methods and procedures, including the types of equipment, vessels, and moorings (i.e., anchors, chains, lines, etc.) you will use.

(e) A description of your site clearance activities.

(f) Your plans for transportation and disposal (including as an artificial reef) or salvage of the removed facilities, cables, or pipelines and any required approvals.

(g) A description of those resources, conditions, and activities that could be affected by or could affect your proposed decommissioning activities. The description must be as detailed as necessary to assist BSEE in complying with the NEPA and other relevant Federal laws.

(h) The results of any recent biological surveys conducted in the vicinity of the structure and recent observations of turtles or marine mammals at the structure site.

(i) Mitigation measures you will use to protect archaeological and sensitive biological features during removal activities.

(j) A description of measures you will take to prevent unauthorized discharge of pollutants, including marine trash and debris, into the offshore waters.

(k) A statement of whether or not you will use divers to survey the area after removal to determine any effects on marine life.

§ 285.907 How will BSEE process my decommissioning application?

(a) Based upon your inclusion of all the information required by § 285.906, BSEE will compare your decommissioning application with the decommissioning general concept in your approved SAP, COP, or GAP to determine what technical and environmental reviews are needed.

(b) You will likely have to revise your SAP, COP, or GAP, and BOEM will begin the appropriate NEPA analysis and other regulatory reviews as required, if BSEE determines that your decommissioning application would:

(1) Result in a significant change in the impacts previously identified and evaluated in your SAP, COP, or GAP;

(2) Require any additional Federal permits; or

(3) Propose activities not previously identified and evaluated in your SAP, COP, or GAP.

(c) During the review process, we may request additional information if we determine that the information provided is not sufficient to complete the review and approval process.

(d) Upon completion of the technical and environmental reviews, we may approve, approve with conditions, or disapprove your decommissioning application.

(e) If BSEE disapproves your decommissioning application, you must resubmit your application to address the concerns identified by BSEE.

§ 285.908 What must I include in my decommissioning notice?

(a) The decommissioning notice is distinct from your decommissioning application and may only be submitted following approval of your decommissioning application, as described in §§ 285.905 through 285.907. You must submit a decommissioning notice at least 60 days before you plan to begin decommissioning activities.

(b) Your decommissioning notice must include:

(1) A description of any changes to the approved removal methods and procedures in your approved decommissioning application, including changes to the types of vessels and equipment you will use; and

(2) An updated decommissioning schedule.

(c) BSEE will review your decommissioning notice and may require you to resubmit a decommissioning application if BSEE determines that your decommissioning activities would:

(1) Result in a significant change in the impacts previously identified and evaluated;

(2) Require any additional Federal permits; or

(3) Propose activities not previously identified and evaluated.

175 Facility Removal
§ 285.909 When may facilities remain in place following termination of a lease or grant?

(a) In your decommissioning application, you may request that certain facilities authorized in your lease or grant remain in place for other activities authorized in this part, elsewhere in this subchapter, or by other applicable Federal law.

(b) Except as provided in paragraph (c) of this section, if BOEM authorizes facilities to remain in place, the former lessee or grantee under this part remains jointly and severally liable for decommissioning the facility unless satisfactory evidence is provided to BOEM showing that another party has assumed that responsibility and has secured adequate financial assurances.

(c) In your decommissioning application, identify facilities authorized by BOEM to be converted to an artificial reef or otherwise toppled in place.

§ 285.910 What must I do when I remove my facility?

(a) You must remove all facilities to a depth of 15 feet below the mudline, unless otherwise authorized by BSEE.

(b) Within 60 days after you remove a facility, you must verify to BSEE that you have cleared the site.

§ 285.911 [Reserved]
176 Decommissioning Report
§ 285.912 After I remove a facility, cable, or pipeline, what information must I submit?

Within 60 days after you remove a facility, cable, or pipeline, you must submit a written report to BSEE that includes the following:

(a) A summary of the removal activities, including the date they were completed;

(b) A description of any mitigation measures you took; and

(c) If you used explosives, a statement signed by your authorized representative that certifies that the types and amount of explosives you used in removing the facility were consistent with those in the approved decommissioning application.

177 Compliance With an Approved Decommissioning Application
§ 285.913 What happens if I fail to comply with my approved decommissioning application?

If you fail to comply with your approved decommissioning plan or application:

(a) BOEM may call for the forfeiture of your bond or other financial assurance;

(b) You remain liable for removal or disposal costs and responsible for accidents or damages that might result from such failure; and

(c) BSEE may take enforcement action under § 285.400.

Subpart J Rights of Use and Easement for Energy- and Marine-Related Activities Using Existing OCS Facilities
178 Regulated Activities
§ 285.1000 What activities does this subpart regulate?

This subpart provides the general provisions for regulating activities that use (or propose to use) an existing OCS facility for energy- or marine-related purposes, that are not otherwise authorized under any other part of this subchapter or any other applicable Federal statute. Activities authorized under any other part of this subchapter or under any other Federal law that use (or propose to use) an existing OCS facility are not subject to this subpart.

§§ 285.1001-285.1013 [Reserved]
179 Alternate Use RUE Administration
§ 285.1014 When will BSEE suspend an Alternate Use RUE?

(a) BSEE may suspend an Alternate Use RUE if:

(1) Necessary to comply with judicial decrees;

(2) Continued activities pursuant to the Alternate Use RUE pose an imminent threat of serious or irreparable harm or damage to natural resources; life (including human and wildlife); property; the marine, coastal, or human environment; or sites, structures, or objects of historical or archaeological significance; or

(3) Operation of the existing OCS facility that is subject to the Alternate Use RUE has been suspended or temporarily prohibited and we have determined that continued activities under the Alternate Use RUE are unsafe or cause undue interference with the operation of the original OCS Lands Act approved activity.

(b) A suspension will extend the term of your Alternate Use RUE grant for the period of the suspension.

§ 285.1015 [Reserved]
§ 285.1016 When will an Alternate Use RUE be cancelled?

The Secretary may cancel an Alternate Use RUE if it is determined, after notice and opportunity to be heard:

(a) You no longer qualify to hold an Alternate Use RUE;

(b) You failed to provide any additional financial assurance required by BOEM, replace or provide additional coverage for a de-valued bond, or replace a lapsed or forfeited bond within the prescribed time period;

(c) Continued activity under the Alternate Use RUE is likely to cause serious harm or damage to natural resources; life (including human and wildlife); property; the marine, coastal, or human environment; or sites, structures, or objects of historical or archaeological significance;

(d) Continued activity under the Alternate Use RUE is determined to be adversely impacting the original OCS Lands Act approved activities on the existing OCS facility;

(e) You failed to comply with any of the terms and conditions of your approved Alternate Use RUE or your approved plan; or

(f) You otherwise failed to comply with applicable laws or regulations.

§ 285.1017 [Reserved]
180 Decommissioning an Alternate Use RUE
§ 285.1018 Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE?

(a) The holder of an Alternate Use RUE is responsible for all decommissioning obligations that accrue following the issuance of the Alternate Use RUE and which pertain to the Alternate Use RUE.

(b) The lessee under the lease originally issued under 30 CFR chapter V will remain responsible for decommissioning obligations that accrued before issuance of the Alternate Use RUE, as well as for decommissioning obligations that accrue following issuance of the Alternate Use RUE to the extent associated with continued activities authorized under other parts of this title.

§ 285.1019 What are the decommissioning requirements for an Alternate Use RUE?

(a) Decommissioning requirements will be determined by BOEM and BSEE on a case-by-case basis, and will be included in the terms of the Alternate Use RUE.

(b) Decommissioning activities must be completed within 1 year of termination of the Alternate Use RUE.

(c) If you fail to satisfy all decommissioning requirements within the prescribed time period, BOEM will call for the forfeiture of your bond or other financial guarantee, and you will remain liable for all accidents or damages that might result from such failure.